type     day        hms     lat       lon         spd        dir       pre        qi
IR     2025130    131400   -3.8900 -132.9200       4.1        99       192        95
IR     2025130    131400   -3.9500 -133.0300       5.0        98       185        91
IR     2025130    131400   -3.9500 -133.0500       5.3        98       183        92
IR     2025130    131400   -3.9300 -133.1800       5.6        95       174        93
IR     2025130    131400   -3.8700 -137.2300       9.6       124       257        60
IR     2025130    131400   -3.9200 -137.3900       7.4       124       234        83
IR     2025130    131400   -3.9400 -137.4100       6.2       125       223        93
IR     2025130    131400   -3.8700 -137.5000       8.3       124       188        80
IR     2025130    131400   -3.8700 -137.6600       8.1       118       191        79
IR     2025130    131400   -3.8900 -137.7200       8.1       118       200        80
IR     2025130    131400   -3.8900 -137.8100       5.6       113       216        97
IR     2025130    131400   -3.9400 -137.9000       6.1       121       207        94
IR     2025130    131400   -3.9400 -138.1300       7.7       118       226        85
IR     2025130    131400   -4.0200 -132.9200       4.4        97       190        90
IR     2025130    131400   -4.0000 -133.1100       5.0       100       183        91
IR     2025130    131400   -4.0400 -133.1400       4.0        87       184        93
IR     2025130    131400   -3.9800 -137.3400       5.6       124       246        87
IR     2025130    131400   -3.9600 -137.4300       5.1       126       215        93
IR     2025130    131400   -3.9800 -137.6300       7.4       132       191        83
IR     2025130    131400   -4.0300 -137.7200       7.6       125       192        79
IR     2025130    131400   -3.9600 -137.7500       7.9       126       191        83
IR     2025130    131400   -3.9600 -137.9000       6.2       118       193        94
IR     2025130    131400   -3.9900 -137.9700       7.1       116       193        84
IR     2025130    131400   -4.0300 -138.0900       8.0       114       201        78
IR     2025130    131400   -3.9900 -138.1300       8.4       118       210        76
IR     2025130    131400   -4.0300 -138.2000       7.2       119       226        89
IR     2025130    131400   -3.9900 -138.3700       4.4       138       279        63
IR     2025130    131400   -3.9600 -140.9800       5.5       304       219        60
IR     2025130    131400   -4.0900 -134.0900       4.4       263       302        84
IR     2025130    131400   -4.0900 -135.2400       4.1       274       360        69
IR     2025130    131400   -4.0500 -135.4700       4.3       278       354        74
IR     2025130    131400   -4.0900 -136.3100       4.8       303       320        60
IR     2025130    131400   -4.1200 -136.4300       4.3       310       304        64
IR     2025130    131400   -4.1000 -137.6800       6.3       121       205        92
IR     2025130    131400   -4.0500 -137.7300       7.5       122       192        78
IR     2025130    131400   -4.1200 -137.8600       5.6       106       190        70
IR     2025130    131400   -4.0500 -137.9700       7.3       112       190        72
IR     2025130    131400   -4.0700 -138.0400       7.2       107       192        78
IR     2025130    131400   -4.1200 -138.0800       6.4       109       196        85
IR     2025130    131400   -4.0500 -138.2000       7.2       117       226        89
IR     2025130    131400   -4.1000 -138.2600       7.0       119       255        89
IR     2025130    131400   -4.0800 -138.3500       6.9       131       259        64
IR     2025130    131400   -4.1200 -138.4700       4.0       133       259        80
IR     2025130    131400   -4.2200 -135.3100       4.5       275       350        75
IR     2025130    131400   -4.1400 -137.7000       6.3       119       211        81
IR     2025130    131400   -4.1600 -137.7300       6.7       114       213        67
IR     2025130    131400   -4.2100 -137.9000       5.8       113       192        64
IR     2025130    131400   -4.2100 -137.9100       6.1       114       191        65
IR     2025130    131400   -4.2100 -138.2600       5.1       113       245        87
IR     2025130    131400   -4.1400 -138.2700       6.8       121       257        93
IR     2025130    131400   -4.1600 -138.4000       5.4       125       253        99
IR     2025130    131400   -4.2100 -138.5300       4.0       129       226        97
IR     2025130    131400   -4.1900 -139.8100       4.8       358       318        86
IR     2025130    131400   -4.1900 -139.8300       4.4       355       318        90
IR     2025130    131400   -4.1900 -140.6200       8.2       337       444        62
IR     2025130    131400   -4.1700 -140.6900       8.1       338       446        64
IR     2025130    131400   -4.1600 -140.7600       8.1       338       446        65
IR     2025130    131400   -4.1900 -140.8200       8.9       344       465        63
IR     2025130    131400   -4.2100 -141.1600       8.3       320       438        61
IR     2025130    131400   -4.2400 -133.9400       4.0       256       302        85
IR     2025130    131400   -4.2700 -137.6600       5.8       143       232        87
IR     2025130    131400   -4.2300 -137.9100       6.0       116       192        66
IR     2025130    131400   -4.3000 -138.0200       5.2       123       201        95
IR     2025130    131400   -4.2700 -138.1700       4.7       106       223        76
IR     2025130    131400   -4.2300 -138.2600       4.8       114       242        88
IR     2025130    131400   -4.3000 -138.3300       4.9       122       230        96
IR     2025130    131400   -4.2700 -138.3800       5.0       125       226        94
IR     2025130    131400   -4.2300 -138.5300       4.0       130       223        97
IR     2025130    131400   -4.2300 -139.6600       4.6       353       355        68
IR     2025130    131400   -4.2800 -139.8300       5.1         1       320        86
IR     2025130    131400   -4.3000 -139.8400       4.8         2       326        86
IR     2025130    131400   -4.2300 -140.6200       8.3       337       444        62
IR     2025130    131400   -4.2300 -140.8400       8.7       343       446        62
IR     2025130    131400   -4.2500 -141.3600       5.0       345       442        72
IR     2025130    131400   -4.3800 -133.0500       4.3       122       216        93
IR     2025130    131400   -4.3900 -137.1400       4.3         5       297        89
IR     2025130    131400   -4.3800 -137.2300       6.5         3       309        79
IR     2025130    131400   -4.3800 -137.8600       4.9       141       230        87
IR     2025130    131400   -4.3200 -137.9500       5.9       126       204        95
IR     2025130    131400   -4.3200 -138.0000       5.4       125       203        97
IR     2025130    131400   -4.3800 -138.1300       5.3       117       216        98
IR     2025130    131400   -4.3400 -138.1800       4.8       111       221        90
IR     2025130    131400   -4.3900 -138.3100       4.4       126       218        98
IR     2025130    131400   -4.3200 -138.3300       4.8       121       226        97
IR     2025130    131400   -4.3600 -141.1600       7.6       334       489        66
IR     2025130    131400   -4.3200 -141.2300       8.4       332       460        63
IR     2025130    131400   -4.3900 -141.3400       6.0       347       453        83
IR     2025130    131400   -4.4900 -132.9500       5.3       115       205        82
IR     2025130    131400   -4.4200 -133.0600       5.0       123       216        95
IR     2025130    131400   -4.4200 -133.1600       4.5       124       217        96
IR     2025130    131400   -4.4900 -134.6100       4.3       266       312        79
IR     2025130    131400   -4.4100 -136.6800       4.4       332       312        77
IR     2025130    131400   -4.4800 -138.0200       4.2       133       210        97
IR     2025130    131400   -4.4300 -138.1100       5.5       121       215       100
IR     2025130    131400   -4.4800 -138.1700       5.9       122       215        99
IR     2025130    131400   -4.4300 -138.2900       4.6       129       215        99
IR     2025130    131400   -4.4500 -138.3800       4.5       133       206        94
IR     2025130    131400   -4.4700 -141.1600       5.4       333       467        86
IR     2025130    131400   -4.4500 -141.1800       6.4       335       465        75
IR     2025130    131400   -4.4700 -141.2900       6.1       338       478        77
IR     2025130    131400   -4.5700 -132.9300       4.7       110       192        65
IR     2025130    131400   -4.5100 -133.1200       7.2       125       215        64
IR     2025130    131400   -4.5100 -133.1400       6.9       126       216        65
IR     2025130    131400   -4.5400 -136.7000       4.8         6       270        60
IR     2025130    131400   -4.5200 -137.2800       4.5        51       205        76
IR     2025130    131400   -4.5600 -138.1500       5.7       123       208        61
IR     2025130    131400   -4.5400 -138.4200       4.1       129       191        63
IR     2025130    131400   -4.6500 -136.7500       4.3        48       222        80
IR     2025130    131400   -4.6700 -136.7700       4.4        56       221        89
IR     2025130    131400   -4.6500 -137.3700       5.3        70       185        81
IR     2025130    131400   -4.5900 -137.4800       4.8        20       195        64
IR     2025130    131400   -4.6700 -137.6000       4.7         7       197        65
IR     2025130    131400   -4.5900 -138.1300       5.1       128       206        61
IR     2025130    131400   -4.6500 -138.4200       5.3       140       180        67
IR     2025130    131400   -4.6700 -138.5100       5.6       144       179        77
IR     2025130    131400   -4.5900 -138.5600       4.2       140       184        72
IR     2025130    131400   -4.6900 -133.5200       4.2       104       328        82
IR     2025130    131400   -4.6900 -137.3700       4.8        64       180        82
IR     2025130    131400   -4.6900 -137.6200       4.5         6       200        63
IR     2025130    131400   -4.6800 -138.4200       5.5       141       180        66
IR     2025130    131400   -4.7600 -138.4900       5.4       141       178        75
IR     2025130    131400   -4.7600 -138.5800       4.9       146       178        90
IR     2025130    131400   -4.7600 -138.6200       4.7       148       178        94
IR     2025130    131400   -4.7200 -138.7400       4.2       160       182        96
IR     2025130    131400   -4.8600 -133.4300       4.9       106       341        83
IR     2025130    131400   -4.8500 -134.4600       4.1       139       285        82
IR     2025130    131400   -4.8500 -134.5200       4.3       139       283        75
IR     2025130    131400   -4.8500 -134.6100       4.5       147       280        86
IR     2025130    131400   -4.8200 -135.0100       4.1       132       275        89
IR     2025130    131400   -4.8200 -135.0300       4.3       130       272        89
IR     2025130    131400   -4.8300 -135.1400       4.3       131       260        92
IR     2025130    131400   -4.8500 -138.4200       5.4       151       185        84
IR     2025130    131400   -4.7900 -138.5400       4.9       142       177        77
IR     2025130    131400   -4.7800 -138.6200       4.6       147       178        95
IR     2025130    131400   -4.9300 -133.3500       4.1       102       208        63
IR     2025130    131400   -4.9400 -134.4800       5.0       140       287        73
IR     2025130    131400   -4.9300 -134.5000       5.1       141       286        70
IR     2025130    131400   -4.9300 -134.5900       5.7       148       281        73
IR     2025130    131400   -4.9400 -135.8500       4.4       135       198        99
IR     2025130    131400   -4.9100 -135.9500       4.2       132       194       100
IR     2025130    131400   -4.9200 -136.1000       4.5       121       188        96
IR     2025130    131400   -4.9200 -136.1200       4.6       119       187        93
IR     2025130    131400   -4.8800 -138.3400       5.5       152       201        61
IR     2025130    131400   -4.9000 -138.4500       4.8       143       187        80
IR     2025130    131400   -4.9200 -138.5100       4.4       133       184        70
IR     2025130    131400   -4.8700 -138.6500       4.1       145       179        98
IR     2025130    131400   -5.0400 -132.9800       5.1       116       187        65
IR     2025130    131400   -4.9700 -133.3000       4.1        82       190        61
IR     2025130    131400   -4.9800 -134.4600       4.8       142       290        78
IR     2025130    131400   -4.9600 -134.5200       5.3       140       286        73
IR     2025130    131400   -4.9600 -134.5900       5.9       147       280        74
IR     2025130    131400   -5.0200 -135.0600       5.2       107       250        80
IR     2025130    131400   -4.9800 -135.8300       4.5       138       198        99
IR     2025130    131400   -4.9600 -135.8500       4.5       137       197        99
IR     2025130    131400   -4.9600 -136.0100       5.0       132       191        94
IR     2025130    131400   -4.9800 -136.0800       4.7       123       189        95
IR     2025130    131400   -5.1300 -132.9100       4.8       113       189        61
IR     2025130    131400   -5.0900 -133.0000       4.7       103       190        70
IR     2025130    131400   -5.0500 -134.5500       5.1       155       288        75
IR     2025130    131400   -5.1300 -135.0400       4.7       102       243        94
IR     2025130    131400   -5.0900 -136.0600       4.4       128       191        98
IR     2025130    131400   -5.1000 -140.5800       5.2        96       195        88
IR     2025130    131400   -5.1200 -140.6000       5.3        91       193        87
IR     2025130    131400   -5.1000 -140.7300       4.2        67       263        93
IR     2025130    131400   -5.2000 -133.0000       4.6       100       195        66
IR     2025130    131400   -5.2000 -133.0500       4.4        84       200        90
IR     2025130    131400   -5.2200 -133.3700       4.0       210       837        77
IR     2025130    131400   -5.2200 -133.6600       4.5       143       282        90
IR     2025130    131400   -5.2200 -133.6800       4.4       146       280        98
IR     2025130    131400   -5.1400 -135.0300       4.7       103       246        95
IR     2025130    131400   -5.1400 -135.0800       4.1       100       236        84
IR     2025130    131400   -5.1800 -135.7700       4.0       147       201        98
IR     2025130    131400   -5.2200 -135.9300       4.9       127       195        95
IR     2025130    131400   -5.2000 -135.9500       4.9       128       195        94
IR     2025130    131400   -5.1800 -136.1200       5.0       111       190        96
IR     2025130    131400   -5.1800 -140.3700       4.5        81       192        85
IR     2025130    131400   -5.1600 -140.4700       4.2        95       190        85
IR     2025130    131400   -5.1400 -140.4900       4.5        98       191        84
IR     2025130    131400   -5.1400 -140.6200       5.4        86       192        89
IR     2025130    131400   -5.1800 -140.6900       5.2        74       193        85
IR     2025130    131400   -5.2800 -132.9100       4.1       100       190        74
IR     2025130    131400   -5.2900 -132.9400       4.0       100       191        75
IR     2025130    131400   -5.2800 -133.0400       4.1        97       195        63
IR     2025130    131400   -5.2900 -133.2900       4.3       210       852        76
IR     2025130    131400   -5.2400 -133.3700       4.1       208       837        77
IR     2025130    131400   -5.2700 -133.6400       4.6       145       263        87
IR     2025130    131400   -5.2700 -133.6800       4.6       144       262        97
IR     2025130    131400   -5.2700 -135.6800       4.7       143       204        98
IR     2025130    131400   -5.2700 -135.8200       4.4       136       199        99
IR     2025130    131400   -5.2500 -135.8400       4.4       131       197        99
IR     2025130    131400   -5.2900 -135.9700       5.2       116       194        95
IR     2025130    131400   -5.3100 -136.1000       6.4       103       190        92
IR     2025130    131400   -5.2900 -136.3100       7.3        92       180        86
IR     2025130    131400   -5.2300 -136.3900       4.0        86       181        88
IR     2025130    131400   -5.3000 -138.3400       4.3        89       167        90
IR     2025130    131400   -5.3000 -139.5000       4.1        96       203        88
IR     2025130    131400   -5.2800 -140.3100       5.3        84       185        85
IR     2025130    131400   -5.2500 -140.4700       4.7        81       187        73
IR     2025130    131400   -5.2500 -140.5300       5.2        85       187        81
IR     2025130    131400   -5.2800 -140.6000       4.7        74       186        75
IR     2025130    131400   -5.2300 -140.7500       4.8        60       194        85
IR     2025130    131400   -5.3000 -140.8200       5.0        47       193        94
IR     2025130    131400   -5.3300 -132.9600       4.1       110       189        63
IR     2025130    131400   -5.3300 -133.0700       4.0       106       195        60
IR     2025130    131400   -5.3800 -133.3100       4.2       203       867        79
IR     2025130    131400   -5.3700 -133.4700       4.0       203       831        72
IR     2025130    131400   -5.3300 -133.6200       4.1       152       263        99
IR     2025130    131400   -5.3200 -135.8600       4.5       124       198        97
IR     2025130    131400   -5.4000 -135.9900       5.6       117       193        93
IR     2025130    131400   -5.4000 -136.1000       5.8       107       191        98
IR     2025130    131400   -5.3600 -136.1500       6.9       101       188        92
IR     2025130    131400   -5.3800 -136.3900       6.8        91       177        93
IR     2025130    131400   -5.4000 -137.5100       5.6        69       187        91
IR     2025130    131400   -5.3200 -137.5600       5.3        69       169        92
IR     2025130    131400   -5.4000 -137.7300       5.4        53       178        96
IR     2025130    131400   -5.3900 -137.7600       5.3        45       181        90
IR     2025130    131400   -5.3900 -137.9400       5.7        35       182        95
IR     2025130    131400   -5.3800 -138.1400       4.2        78       170        98
IR     2025130    131400   -5.3900 -138.2200       4.8        92       164        93
IR     2025130    131400   -5.3400 -138.3600       4.3        93       163        86
IR     2025130    131400   -5.3800 -138.4300       4.0        86       159        89
IR     2025130    131400   -5.3900 -139.4100       4.7       135       211        87
IR     2025130    131400   -5.3800 -139.4800       4.8       122       200        92
IR     2025130    131400   -5.3600 -139.5900       4.5        92       194        92
IR     2025130    131400   -5.3900 -140.1700       4.0       127       184        93
IR     2025130    131400   -5.3900 -140.3100       6.2       107       183        96
IR     2025130    131400   -5.3900 -140.3500       7.1       103       184        96
IR     2025130    131400   -5.3400 -140.4600       4.8        87       186        75
IR     2025130    131400   -5.3200 -140.5800       4.5        75       185        77
IR     2025130    131400   -5.3200 -140.6700       4.3        66       182        82
IR     2025130    131400   -5.3400 -140.7500       5.1        58       182        89
IR     2025130    131400   -5.3200 -140.8400       4.7        51       188        91
IR     2025130    131400   -5.3800 -140.9600       4.8        75       208        94
IR     2025130    131400   -5.3800 -140.9800       4.6        75       211        94
IR     2025130    131400   -5.3900 -141.0700       4.0        73       271        92
IR     2025130    131400   -5.4900 -135.9100       4.1       139       195       100
IR     2025130    131400   -5.4900 -135.9300       4.4       138       195        99
IR     2025130    131400   -5.4200 -136.0800       5.5       111       192        97
IR     2025130    131400   -5.4200 -136.1700       6.4       100       187        95
IR     2025130    131400   -5.4900 -136.2000       5.4       105       186        99
IR     2025130    131400   -5.4900 -136.3500       6.1       103       180        98
IR     2025130    131400   -5.4900 -136.4000       5.4       104       178        99
IR     2025130    131400   -5.4500 -137.5500       6.2        73       202        80
IR     2025130    131400   -5.4900 -137.6000       7.2        73       197        90
IR     2025130    131400   -5.4900 -137.7300       6.5        53       191        96
IR     2025130    131400   -5.4300 -137.7600       6.0        49       185        87
IR     2025130    131400   -5.4300 -137.8700       6.7        37       183        96
IR     2025130    131400   -5.4700 -138.0000       6.3        53       177        97
IR     2025130    131400   -5.4700 -138.0900       5.8        72       166       100
IR     2025130    131400   -5.4500 -138.1100       5.4        74       166        99
IR     2025130    131400   -5.4300 -138.2000       4.5        93       160        97
IR     2025130    131400   -5.4900 -138.9000       4.1        88       142        82
IR     2025130    131400   -5.4100 -139.3000       4.1       172       222        98
IR     2025130    131400   -5.4500 -139.4300       5.2       149       201        95
IR     2025130    131400   -5.4300 -139.4400       5.2       142       199        92
IR     2025130    131400   -5.4500 -139.6100       4.2       111       192        87
IR     2025130    131400   -5.4300 -139.6300       4.0       106       191        86
IR     2025130    131400   -5.4700 -140.1900       4.6       133       185        89
IR     2025130    131400   -5.4500 -140.2800       4.8       119       184        96
IR     2025130    131400   -5.4700 -140.3700       5.7       109       184        99
IR     2025130    131400   -5.4300 -140.7600       4.0        64       174        93
IR     2025130    131400   -5.4100 -140.8000       4.2        60       177        92
IR     2025130    131400   -5.4100 -140.9100       4.6        76       180        92
IR     2025130    131400   -5.4100 -141.0000       4.8        76       202        88
IR     2025130    131400   -5.5100 -135.9100       4.0       142       196       100
IR     2025130    131400   -5.5600 -135.9700       4.1       145       195       100
IR     2025130    131400   -5.5800 -136.1100       4.0       143       187        99
IR     2025130    131400   -5.5100 -136.3900       5.3       105       179       100
IR     2025130    131400   -5.5600 -137.5300       7.5        70       230        81
IR     2025130    131400   -5.5000 -137.6200       7.4        72       198        90
IR     2025130    131400   -5.5800 -137.7400       7.1        47       195        95
IR     2025130    131400   -5.5800 -137.8200       7.3        43       190        91
IR     2025130    131400   -5.5800 -137.8900       7.5        49       179        99
IR     2025130    131400   -5.5000 -138.0500       6.7        64       164        99
IR     2025130    131400   -5.5000 -138.0700       6.4        69       163       100
IR     2025130    131400   -5.5600 -138.7800       5.7        85       134        97
IR     2025130    131400   -5.5800 -138.8500       5.1        82       136        92
IR     2025130    131400   -5.5600 -139.3900       4.1       178       216        99
IR     2025130    131400   -5.5200 -139.4100       4.6       167       209        92
IR     2025130    131400   -5.5000 -139.5700       4.0       138       193        87
IR     2025130    131400   -5.5200 -139.7300       4.5       144       194        90
IR     2025130    131400   -5.5200 -139.7900       4.4       153       193        95
IR     2025130    131400   -5.5800 -139.9000       5.5       174       191        99
IR     2025130    131400   -5.5800 -139.9900       4.2       164       189        98
IR     2025130    131400   -5.5000 -140.0900       4.0       136       187        76
IR     2025130    131400   -5.5000 -140.1700       5.1       132       187        81
IR     2025130    131400   -5.5600 -140.3300       4.0       132       187        96
IR     2025130    131400   -5.5000 -141.0000       4.1        68       184        79
IR     2025130    131400   -5.6200 -136.0400       4.2       151       193       100
IR     2025130    131400   -5.6700 -137.3100       5.8        82       221        69
IR     2025130    131400   -5.6500 -137.3800       6.0        67       210        62
IR     2025130    131400   -5.6700 -137.5100       6.6        51       193        78
IR     2025130    131400   -5.6300 -137.5600       6.8        49       201        73
IR     2025130    131400   -5.6000 -137.7300       6.9        47       197        95
IR     2025130    131400   -5.6500 -137.7800       7.3        27       194        99
IR     2025130    131400   -5.6100 -137.8700       6.6        49       179        98
IR     2025130    131400   -5.6700 -137.9800       6.4        72       162        93
IR     2025130    131400   -5.6000 -138.0300       6.9        77       157        98
IR     2025130    131400   -5.6700 -138.1100       6.2        82       153        99
IR     2025130    131400   -5.6000 -138.2300       4.1        59       133        65
IR     2025130    131400   -5.6700 -138.3200       5.8        45       132        98
IR     2025130    131400   -5.6700 -138.6100       5.3        82       129        96
IR     2025130    131400   -5.6700 -138.6800       6.4        84       132        98
IR     2025130    131400   -5.6700 -138.8100       5.2        78       138        87
IR     2025130    131400   -5.6700 -139.7700       6.6       150       201        98
IR     2025130    131400   -5.6700 -139.8200       7.8       162       201       100
IR     2025130    131400   -5.6100 -139.9000       6.8       176       193        97
IR     2025130    131400   -5.6300 -139.9900       6.0       169       189        99
IR     2025130    131400   -5.6700 -140.1100       7.3       157       187        92
IR     2025130    131400   -5.6300 -140.1700       6.8       145       187        90
IR     2025130    131400   -5.6500 -140.2400       5.5       142       189        93
IR     2025130    131400   -5.6900 -136.1700       4.0       134       191       100
IR     2025130    131400   -5.7100 -136.2400       4.0       128       190        99
IR     2025130    131400   -5.7600 -136.3600       4.5       101       181        97
IR     2025130    131400   -5.7400 -136.3800       4.4       103       181        98
IR     2025130    131400   -5.7600 -136.4700       5.2        88       176        94
IR     2025130    131400   -5.7600 -136.5800       5.5        80       170        87
IR     2025130    131400   -5.7600 -136.6600       5.1        76       169        79
IR     2025130    131400   -5.7400 -136.7600       5.0        77       166        88
IR     2025130    131400   -5.6900 -136.9100       4.6        75       162        72
IR     2025130    131400   -5.7400 -137.0000       4.0        83       163        74
IR     2025130    131400   -5.7200 -137.5800       9.0        24       188        94
IR     2025130    131400   -5.7600 -137.6500      10.5        15       188        94
IR     2025130    131400   -5.6900 -137.7600       8.3        17       194       100
IR     2025130    131400   -5.7600 -137.8300       7.0        16       186       100
IR     2025130    131400   -5.7200 -137.8900       5.5        33       178        99
IR     2025130    131400   -5.7200 -138.0000       5.7        64       163        92
IR     2025130    131400   -5.7600 -138.0900       6.1        68       156       100
IR     2025130    131400   -5.6900 -138.2000       6.0        75       139        96
IR     2025130    131400   -5.6900 -138.3000       6.2        53       132        97
IR     2025130    131400   -5.7000 -138.3400       6.2        53       132        96
IR     2025130    131400   -5.7600 -138.5000       5.1        69       129       100
IR     2025130    131400   -5.7600 -138.5400       5.1        72       129        97
IR     2025130    131400   -5.7000 -138.6300       5.6        81       130        99
IR     2025130    131400   -5.7600 -138.7700       5.4        62       152        79
IR     2025130    131400   -5.7400 -138.7900       5.3        63       152        81
IR     2025130    131400   -5.7400 -139.0300       4.1       331       177        84
IR     2025130    131400   -5.7200 -139.7500       5.0       138       204        99
IR     2025130    131400   -5.7000 -139.7700       6.3       147       203        95
IR     2025130    131400   -5.7400 -139.8600       5.8       180       208        84
IR     2025130    131400   -5.7600 -140.0000       7.4       168       204        97
IR     2025130    131400   -5.7000 -140.0900       6.7       155       190        96
IR     2025130    131400   -5.7000 -140.1300       7.8       158       189        92
IR     2025130    131400   -5.7600 -140.2800       6.0       150       202        89
IR     2025130    131400   -5.7600 -140.6900       4.3        85       163        95
IR     2025130    131400   -5.7200 -140.7600       4.0       106       166        86
IR     2025130    131400   -5.8500 -135.8000       4.1       156       214        84
IR     2025130    131400   -5.8500 -136.2700       5.1       100       186        90
IR     2025130    131400   -5.8300 -136.3100       5.5        95       183        90
IR     2025130    131400   -5.8000 -136.4200       5.7        87       177        97
IR     2025130    131400   -5.8500 -136.5100       7.4        78       172        95
IR     2025130    131400   -5.8500 -136.6500       5.9        76       170        88
IR     2025130    131400   -5.8500 -136.6700       5.7        76       169        86
IR     2025130    131400   -5.8500 -136.8000       5.2        72       168        95
IR     2025130    131400   -5.8200 -136.9300       5.3        74       162        87
IR     2025130    131400   -5.8000 -137.0200       4.4        78       163        68
IR     2025130    131400   -5.8500 -137.0900       4.7        71       166        73
IR     2025130    131400   -5.8500 -137.1800       4.1        76       180        83
IR     2025130    131400   -5.7800 -137.4900       7.3        42       192        82
IR     2025130    131400   -5.8300 -137.6000       8.3        28       185        95
IR     2025130    131400   -5.7800 -137.6700      10.2        16       187        96
IR     2025130    131400   -5.8100 -137.8200       7.8        19       186       100
IR     2025130    131400   -5.7800 -137.8300       6.9        17       186       100
IR     2025130    131400   -5.8000 -137.9200       5.1        34       176        98
IR     2025130    131400   -5.8000 -138.0100       5.4        56       164        93
IR     2025130    131400   -5.7800 -138.1100       6.2        71       155        99
IR     2025130    131400   -5.7800 -138.2100       7.3        73       146        96
IR     2025130    131400   -5.8100 -138.3200       8.2        69       140        89
IR     2025130    131400   -5.8000 -138.3900       7.9        65       133        94
IR     2025130    131400   -5.7800 -138.5400       5.1        75       130        88
IR     2025130    131400   -5.8000 -138.5600       5.4        76       130        84
IR     2025130    131400   -5.8500 -138.6700       5.3        57       149        84
IR     2025130    131400   -5.8100 -138.7700       5.2        47       160        78
IR     2025130    131400   -5.8000 -138.8800       4.4        18       171        91
IR     2025130    131400   -5.8500 -138.9400       5.5         0       189        97
IR     2025130    131400   -5.8500 -139.6800       8.9        79       202        99
IR     2025130    131400   -5.8300 -139.7100       7.3        86       205        82
IR     2025130    131400   -5.7800 -139.8600       5.9       194       210        94
IR     2025130    131400   -5.7800 -139.8800       5.6       191       213        94
IR     2025130    131400   -5.8100 -140.0200       7.9       162       208       100
IR     2025130    131400   -5.7900 -140.0900       7.3       155       204        99
IR     2025130    131400   -5.7800 -140.2200       6.0       144       204        99
IR     2025130    131400   -5.7800 -140.3100       4.9       142       206        95
IR     2025130    131400   -5.7900 -140.7300       4.2        88       162        92
IR     2025130    131400   -5.9300 -133.9800       5.4       194       808        99
IR     2025130    131400   -5.9500 -134.0300       5.7       194       808        98
IR     2025130    131400   -5.8700 -135.7800       4.0       154       216        82
IR     2025130    131400   -5.9300 -136.2500       4.7       100       184        85
IR     2025130    131400   -5.9300 -136.3100       5.1        92       180        85
IR     2025130    131400   -5.9300 -136.4200       6.5        78       173        96
IR     2025130    131400   -5.9100 -136.7300       5.6        73       169        95
IR     2025130    131400   -5.9400 -136.8000       5.2        73       169        98
IR     2025130    131400   -5.9400 -136.8400       5.1        72       169        97
IR     2025130    131400   -5.9100 -136.9600       4.9        72       163        89
IR     2025130    131400   -5.8700 -137.0700       4.8        71       164        72
IR     2025130    131400   -5.8700 -137.1800       4.3        74       178        83
IR     2025130    131400   -5.9400 -137.6200       7.5        59       184        87
IR     2025130    131400   -5.9400 -137.6300       7.9        59       184        86
IR     2025130    131400   -5.9200 -137.7200       9.3        43       190        97
IR     2025130    131400   -5.8900 -137.8500       8.1        17       187       100
IR     2025130    131400   -5.9400 -137.9000       7.8        11       186        96
IR     2025130    131400   -5.9200 -138.0300       6.2        27       174        96
IR     2025130    131400   -5.9400 -138.1600       6.5        68       164        99
IR     2025130    131400   -5.9400 -138.2300       7.7        77       158        93
IR     2025130    131400   -5.9400 -138.2700       8.0        77       156        87
IR     2025130    131400   -5.9400 -138.4300       8.4        69       154        80
IR     2025130    131400   -5.9400 -138.4500       8.2        67       154        81
IR     2025130    131400   -5.9400 -138.6100       5.8        43       167        76
IR     2025130    131400   -5.9200 -138.6500       5.5        38       163        81
IR     2025130    131400   -5.9400 -138.7700       6.7        19       187        93
IR     2025130    131400   -5.9200 -138.8500       6.9        14       195        94
IR     2025130    131400   -5.9400 -138.9400       7.1         5       221        98
IR     2025130    131400   -5.8900 -139.4100       4.7         5       211        89
IR     2025130    131400   -5.9400 -139.5700       4.2        90       205        91
IR     2025130    131400   -5.9200 -139.5900       5.5        85       205        97
IR     2025130    131400   -5.8900 -139.7100      10.9        62       211        71
IR     2025130    131400   -5.9200 -139.8100      18.2        55       227        74
IR     2025130    131400   -5.9400 -140.0000       6.0       133       231        92
IR     2025130    131400   -5.9000 -140.0600       6.7       148       225        99
IR     2025130    131400   -5.9000 -140.1300       5.5       148       223        98
IR     2025130    131400   -5.9000 -140.2600       5.1       134       215        99
IR     2025130    131400   -5.8700 -140.3700       4.8       123       209        94
IR     2025130    131400   -5.8900 -140.4000       4.5       110       209        91
IR     2025130    131400   -6.0200 -133.3500       4.0        73       215        63
IR     2025130    131400   -6.0200 -133.9400       5.2       193       831       100
IR     2025130    131400   -5.9700 -134.0300       5.7       194       808        98
IR     2025130    131400   -5.9700 -134.1200       6.0       197       797        93
IR     2025130    131400   -5.9800 -136.3600       5.2        85       170        97
IR     2025130    131400   -5.9800 -136.4700       5.6        79       168        97
IR     2025130    131400   -5.9600 -136.5300       6.6        78       168        96
IR     2025130    131400   -5.9600 -136.6200       6.3        79       169        91
IR     2025130    131400   -5.9600 -136.8500       5.0        72       169        97
IR     2025130    131400   -6.0300 -136.9800       5.1        69       167        99
IR     2025130    131400   -5.9800 -137.0500       4.5        67       165        82
IR     2025130    131400   -5.9600 -137.1800       5.0        63       170        82
IR     2025130    131400   -6.0200 -137.2700       5.0        51       183        98
IR     2025130    131400   -6.0000 -137.3100       5.7        48       190        97
IR     2025130    131400   -6.0300 -137.3800       5.3        47       187       100
IR     2025130    131400   -6.0000 -137.5100       5.9        50       186        90
IR     2025130    131400   -5.9600 -137.8900       8.0        14       187        98
IR     2025130    131400   -5.9800 -137.9200       8.0        12       185        99
IR     2025130    131400   -6.0300 -138.0300       5.5        40       180        95
IR     2025130    131400   -5.9800 -138.1400       6.7        65       168        99
IR     2025130    131400   -6.0300 -138.2100       8.2        80       170        97
IR     2025130    131400   -6.0100 -138.3600       7.9        73       170        90
IR     2025130    131400   -5.9600 -138.4300       8.3        69       157        80
IR     2025130    131400   -5.9600 -138.4700       7.9        66       161        84
IR     2025130    131400   -5.9600 -138.6100       6.1        41       171        80
IR     2025130    131400   -5.9600 -138.7000       6.7        25       181        93
IR     2025130    131400   -5.9600 -138.9200       7.5         6       224        95
IR     2025130    131400   -5.9800 -139.5900       5.8        97       206        95
IR     2025130    131400   -5.9800 -139.7100      12.2        90       215        74
IR     2025130    131400   -6.0000 -139.8800       5.2        85       233        66
IR     2025130    131400   -5.9800 -139.9700       5.0       107       233        91
IR     2025130    131400   -6.0300 -140.3100       4.7       100       228        98
IR     2025130    131400   -5.9600 -140.4700       4.4        97       208        87
IR     2025130    131400   -6.0600 -134.0100       5.2       195       854        74
IR     2025130    131400   -6.0600 -134.0300       5.4       195       854        72
IR     2025130    131400   -6.0500 -136.6200       5.6        85       167        87
IR     2025130    131400   -6.1100 -136.7600       5.4        76       166        97
IR     2025130    131400   -6.0700 -136.8000       5.7        71       168        99
IR     2025130    131400   -6.1100 -136.9400       5.4        68       168        93
IR     2025130    131400   -6.1300 -136.9800       4.9        67       169        90
IR     2025130    131400   -6.0700 -137.2300       4.6        49       172        90
IR     2025130    131400   -6.1100 -137.2900       5.7        39       176        92
IR     2025130    131400   -6.1300 -137.3400       6.1        40       181        98
IR     2025130    131400   -6.0700 -137.4300       5.2        47       184        99
IR     2025130    131400   -6.0900 -137.8700       7.7        38       190        99
IR     2025130    131400   -6.0700 -137.9400       6.7        29       186       100
IR     2025130    131400   -6.0500 -138.0100       5.6        37       183        95
IR     2025130    131400   -6.0500 -138.1200       7.5        74       176       100
IR     2025130    131400   -6.0500 -138.2100       8.5        80       175        97
IR     2025130    131400   -6.0900 -138.2500       8.6        74       180        94
IR     2025130    131400   -6.0700 -138.3400       8.0        72       182        93
IR     2025130    131400   -6.1200 -138.9200       7.8       358       278        87
IR     2025130    131400   -6.0500 -139.0300       8.2         8       285        98
IR     2025130    131400   -6.1000 -139.4200       5.3       350       217        83
IR     2025130    131400   -6.1200 -139.4400       5.9       352       217        81
IR     2025130    131400   -6.1000 -139.6600       6.2       107       223        80
IR     2025130    131400   -6.1200 -139.7300       5.4        78       229        69
IR     2025130    131400   -6.0700 -139.9700       9.0        68       236        81
IR     2025130    131400   -6.0700 -140.0600       6.0        80       242        83
IR     2025130    131400   -6.0900 -140.0800       5.7        74       244        85
IR     2025130    131400   -6.1200 -140.1800       4.3        65       241        95
IR     2025130    131400   -6.1200 -140.3700       4.3        67       228        93
IR     2025130    131400   -6.2100 -133.2600       4.3       118       207        90
IR     2025130    131400   -6.1900 -133.3100       4.3       104       224        75
IR     2025130    131400   -6.2200 -134.0300       5.8       158       318        64
IR     2025130    131400   -6.2200 -135.5200       4.5       219       244        97
IR     2025130    131400   -6.1600 -135.5800       4.3       221       239        99
IR     2025130    131400   -6.1800 -136.7600       4.3        75       166        94
IR     2025130    131400   -6.1600 -136.7800       4.8        73       167        96
IR     2025130    131400   -6.2000 -136.9100       5.4        64       167        97
IR     2025130    131400   -6.1800 -137.0000       4.9        63       168        97
IR     2025130    131400   -6.1600 -137.0500       4.1        56       166        98
IR     2025130    131400   -6.1600 -137.1600       4.1        42       166       100
IR     2025130    131400   -6.1600 -137.3100       6.1        35       172        94
IR     2025130    131400   -6.1400 -137.4000       5.9        43       181        98
IR     2025130    131400   -6.2000 -137.4100       5.6        41       177        98
IR     2025130    131400   -6.2200 -137.5000       5.4        40       177       100
IR     2025130    131400   -6.1400 -137.7600       8.9        57       184        95
IR     2025130    131400   -6.2000 -137.8900       7.1        52       188       100
IR     2025130    131400   -6.2200 -138.0100       5.7        53       188        96
IR     2025130    131400   -6.2200 -138.0300       5.9        58       188        94
IR     2025130    131400   -6.2200 -138.1200       7.8        67       185        90
IR     2025130    131400   -6.1600 -138.2700       9.1        63       185        96
IR     2025130    131400   -6.2200 -138.3400       9.0        49       191        96
IR     2025130    131400   -6.1600 -138.7900       9.3         8       251        97
IR     2025130    131400   -6.1600 -139.1400       6.3         3       306       100
IR     2025130    131400   -6.2000 -139.3000       5.6       344       239       100
IR     2025130    131400   -6.1400 -139.3200       5.1       346       235        99
IR     2025130    131400   -6.1400 -139.4400       6.4       351       218        86
IR     2025130    131400   -6.1600 -139.6600       5.4        66       228        68
IR     2025130    131400   -6.1400 -139.7100       5.0        74       229        61
IR     2025130    131400   -6.1400 -139.9700       9.8        49       234        78
IR     2025130    131400   -6.1400 -140.0900       6.3        51       244        88
IR     2025130    131400   -6.1400 -140.1800       4.6        60       242        92
IR     2025130    131400   -6.1600 -140.2000       4.5        55       241        82
IR     2025130    131400   -6.3000 -133.2900       4.9       133       193        63
IR     2025130    131400   -6.2400 -134.0500       6.6       156       319        72
IR     2025130    131400   -6.2600 -135.3800       4.5       217       250        91
IR     2025130    131400   -6.2700 -135.4700       5.1       224       247        92
IR     2025130    131400   -6.2400 -135.5400       4.4       220       244        99
IR     2025130    131400   -6.2400 -135.5800       4.2       218       244        99
IR     2025130    131400   -6.3100 -136.3400       4.7        84       185        98
IR     2025130    131400   -6.2400 -136.8500       4.5        61       167        94
IR     2025130    131400   -6.2400 -136.9400       5.5        61       167        96
IR     2025130    131400   -6.3100 -137.0500       5.0        56       167        95
IR     2025130    131400   -6.3100 -137.1600       4.6        48       166        96
IR     2025130    131400   -6.3100 -137.2300       4.0        45       163       100
IR     2025130    131400   -6.2500 -137.3800       5.3        36       172        91
IR     2025130    131400   -6.2300 -137.4300       5.0        42       175        97
IR     2025130    131400   -6.3100 -137.5400       4.6        43       176        96
IR     2025130    131400   -6.3100 -137.5800       4.7        46       178        97
IR     2025130    131400   -6.2900 -138.0300       6.3        57       191        95
IR     2025130    131400   -6.2300 -138.0800       6.9        63       187        91
IR     2025130    131400   -6.3100 -138.2300       8.6        53       187        83
IR     2025130    131400   -6.2300 -138.3400       9.2        47       192        96
IR     2025130    131400   -6.3100 -138.4300       8.8        20       220        96
IR     2025130    131400   -6.3100 -138.4500       8.8        21       228        98
IR     2025130    131400   -6.3100 -138.6100       8.4        14       244        99
IR     2025130    131400   -6.3100 -138.6300       8.5        13       246        99
IR     2025130    131400   -6.2700 -139.0400       7.4       360       317        98
IR     2025130    131400   -6.2500 -139.1500       8.2         2       309        99
IR     2025130    131400   -6.2500 -139.2400       7.0       356       283        99
IR     2025130    131400   -6.2300 -139.3200       6.5       343       234       100
IR     2025130    131400   -6.2500 -139.4400       5.4       349       223        94
IR     2025130    131400   -6.3100 -139.5900       4.1        43       218        94
IR     2025130    131400   -6.3100 -139.6800       7.1        41       226        96
IR     2025130    131400   -6.2700 -139.9300       6.5        33       228        98
IR     2025130    131400   -6.2700 -140.0900       7.1        53       238        88
IR     2025130    131400   -6.2300 -140.1300       6.3        48       241        87
IR     2025130    131400   -6.2300 -140.2400       4.7        47       239        91
IR     2025130    131400   -6.2700 -140.4600       4.2        54       196        88
IR     2025130    131400   -6.3100 -140.6000       4.3        65       181        96
IR     2025130    131400   -6.2300 -141.2700       4.2        85       176        84
IR     2025130    131400   -6.3400 -132.8300       8.6       179       814        80
IR     2025130    131400   -6.3700 -133.0000       4.8       187       187        94
IR     2025130    131400   -6.3700 -133.0500       4.3       183       186        79
IR     2025130    131400   -6.3700 -133.7300       4.4       104       322        98
IR     2025130    131400   -6.3500 -133.7900       5.9        97       317        93
IR     2025130    131400   -6.3300 -133.8400       6.9        97       314        77
IR     2025130    131400   -6.3300 -134.0300       6.4       145       319        79
IR     2025130    131400   -6.3300 -135.2900       4.5       204       265        93
IR     2025130    131400   -6.3300 -135.3200       4.8       210       262        91
IR     2025130    131400   -6.3700 -135.4700       5.9       226       256        83
IR     2025130    131400   -6.3700 -135.5400       5.3       226       251        94
IR     2025130    131400   -6.3800 -135.5800       4.8       226       249        93
IR     2025130    131400   -6.3500 -136.3800       5.2        84       185        93
IR     2025130    131400   -6.3600 -136.4700       4.8        86       183        88
IR     2025130    131400   -6.3600 -136.5400       4.1        90       181        89
IR     2025130    131400   -6.4000 -136.8900       4.9        55       168        92
IR     2025130    131400   -6.3400 -137.0100       5.6        59       167        96
IR     2025130    131400   -6.3600 -137.0300       5.8        59       167        96
IR     2025130    131400   -6.3300 -137.1400       5.0        52       166        97
IR     2025130    131400   -6.3400 -137.2100       4.7        53       164        98
IR     2025130    131400   -6.3300 -137.3800       5.0        37       167        91
IR     2025130    131400   -6.3400 -137.4700       4.4        42       172        84
IR     2025130    131400   -6.3300 -137.5200       4.5        44       176        91
IR     2025130    131400   -6.4000 -137.6100       4.5        46       180        94
IR     2025130    131400   -6.3800 -137.6800       5.1        38       182       100
IR     2025130    131400   -6.4000 -137.7600       6.2        22       185        99
IR     2025130    131400   -6.3400 -137.9000       6.8        32       191        93
IR     2025130    131400   -6.3600 -137.9400       6.8        26       192        95
IR     2025130    131400   -6.4000 -138.2600       7.5        25       199        90
IR     2025130    131400   -6.4000 -138.2800       7.7        21       200        97
IR     2025130    131400   -6.3200 -138.4500       8.7        17       229        97
IR     2025130    131400   -6.3400 -138.6300       7.7        14       263        99
IR     2025130    131400   -6.3400 -138.9500       6.7       352       334        99
IR     2025130    131400   -6.4000 -139.0100       6.9       352       321        98
IR     2025130    131400   -6.3200 -139.0600       7.7       359       316       100
IR     2025130    131400   -6.3800 -139.3900       5.8       346       221        97
IR     2025130    131400   -6.3200 -139.5900       4.2        51       219        99
IR     2025130    131400   -6.3800 -139.7300       4.6        58       225        92
IR     2025130    131400   -6.4000 -140.0200       4.4        53       228        83
IR     2025130    131400   -6.4000 -140.0400       4.8        56       228        87
IR     2025130    131400   -6.3600 -140.2000       5.0        69       236        87
IR     2025130    131400   -6.3800 -140.4600       4.3        47       189        78
IR     2025130    131400   -6.3200 -140.4900       4.8        47       187        84
IR     2025130    131400   -6.4000 -140.6200       4.5        69       185        85
IR     2025130    131400   -6.3400 -141.2000       4.5        84       161        87
IR     2025130    131400   -6.3200 -141.2200       4.6        82       163        85
IR     2025130    131400   -6.3800 -141.3800       4.8        99       166        76
IR     2025130    131400   -6.5000 -133.7300       4.0       186       741        97
IR     2025130    131400   -6.4600 -135.0800       4.8       195       290        99
IR     2025130    131400   -6.4600 -135.1000       4.8       196       284        99
IR     2025130    131400   -6.4200 -135.2300       4.5       207       271        85
IR     2025130    131400   -6.4900 -135.3600       4.4       220       275        99
IR     2025130    131400   -6.4700 -136.2700       5.1       105       194        96
IR     2025130    131400   -6.4200 -136.3600       6.3        86       189        80
IR     2025130    131400   -6.4900 -136.4900       5.9        86       194        76
IR     2025130    131400   -6.4200 -136.8300       4.0        52       172        98
IR     2025130    131400   -6.4500 -136.9400       6.0        60       172        95
IR     2025130    131400   -6.4500 -136.9600       6.3        60       172        96
IR     2025130    131400   -6.4900 -137.0800       7.0        58       172        99
IR     2025130    131400   -6.4900 -137.1800       6.6        61       170        99
IR     2025130    131400   -6.4900 -137.2300       6.2        65       169        98
IR     2025130    131400   -6.4900 -137.3600       5.4        64       167        96
IR     2025130    131400   -6.4200 -137.4800       4.2        43       172        82
IR     2025130    131400   -6.4400 -137.5400       4.4        41       177        85
IR     2025130    131400   -6.4700 -137.6500       5.1        37       183        99
IR     2025130    131400   -6.4900 -137.6800       5.3        34       183       100
IR     2025130    131400   -6.4700 -137.7700       6.3        21       186        99
IR     2025130    131400   -6.4200 -138.1000       6.8        46       197        86
IR     2025130    131400   -6.4200 -138.1200       7.0        49       199        88
IR     2025130    131400   -6.4200 -138.2800       7.6        15       202        97
IR     2025130    131400   -6.4300 -138.3400       8.2         4       210        85
IR     2025130    131400   -6.4500 -138.4100       8.8       345       228        83
IR     2025130    131400   -6.4700 -138.4800       6.7       344       245        97
IR     2025130    131400   -6.4700 -138.7400       4.9        22       354        82
IR     2025130    131400   -6.4500 -138.9000       6.6       354       351        85
IR     2025130    131400   -6.4900 -139.0800       6.5       346       308        99
IR     2025130    131400   -6.4500 -139.4100       4.2       353       214       100
IR     2025130    131400   -6.4700 -139.5500       6.1        94       213        94
IR     2025130    131400   -6.4700 -139.6400       7.7       108       226        87
IR     2025130    131400   -6.4300 -139.7000       5.9        93       227        96
IR     2025130    131400   -6.4700 -140.0600       4.3        56       233        95
IR     2025130    131400   -6.4300 -140.2200       4.7        69       235        89
IR     2025130    131400   -6.4700 -140.2700       4.7        57       228        85
IR     2025130    131400   -6.4500 -140.3300       4.5        56       216        79
IR     2025130    131400   -6.4500 -140.4900       4.8        45       189        79
IR     2025130    131400   -6.4700 -140.5100       5.0        44       189        78
IR     2025130    131400   -6.4100 -140.6400       4.2        72       186        84
IR     2025130    131400   -6.4700 -141.2000       4.9        85       156        83
IR     2025130    131400   -6.4700 -141.3100       5.8        94       163        88
IR     2025130    131400   -6.4700 -141.3600       5.4       101       163        82
IR     2025130    131400   -6.5200 -133.6400       4.2       191       730        99
IR     2025130    131400   -6.5200 -133.6600       4.3       192       731        99
IR     2025130    131400   -6.5100 -135.0100       4.2       187       307       100
IR     2025130    131400   -6.5100 -135.1600       4.8       200       284       100
IR     2025130    131400   -6.5300 -135.5200       4.2       220       301        99
IR     2025130    131400   -6.5100 -136.3200       6.2        97       195        83
IR     2025130    131400   -6.5100 -136.4900       6.2        86       194        78
IR     2025130    131400   -6.5600 -136.8700       4.0        63       189        80
IR     2025130    131400   -6.5500 -137.0100       6.9        60       178       100
IR     2025130    131400   -6.5600 -137.0500       6.9        59       176       100
IR     2025130    131400   -6.5800 -137.1700       6.2        64       171        96
IR     2025130    131400   -6.5500 -137.2800       6.5        67       169        97
IR     2025130    131400   -6.5800 -137.3900       4.7        64       169        89
IR     2025130    131400   -6.5800 -137.4500       4.2        49       170        90
IR     2025130    131400   -6.5300 -137.5700       4.6        37       180        81
IR     2025130    131400   -6.5800 -137.6100       5.0        33       180        87
IR     2025130    131400   -6.5400 -137.7400       5.7        28       186        99
IR     2025130    131400   -6.5300 -137.7700       6.1        24       187        97
IR     2025130    131400   -6.5400 -137.9000       7.3        22       192        93
IR     2025130    131400   -6.5600 -137.9900       7.3        21       199        97
IR     2025130    131400   -6.5800 -138.1200       6.0        12       209        98
IR     2025130    131400   -6.5600 -138.3200       6.5       357       244        81
IR     2025130    131400   -6.5600 -138.4600       5.0       347       325        99
IR     2025130    131400   -6.5400 -138.8800       4.6       339       350        81
IR     2025130    131400   -6.5800 -139.1300       6.3       358       292        99
IR     2025130    131400   -6.5600 -139.1700       6.2         2       288        99
IR     2025130    131400   -6.5800 -139.4400       6.3        32       210        97
IR     2025130    131400   -6.5800 -139.5900       8.3        77       208        98
IR     2025130    131400   -6.5800 -139.6400       7.5        82       223        97
IR     2025130    131400   -6.5200 -139.7300       4.8        99       229        98
IR     2025130    131400   -6.5100 -140.0400       4.2        43       238        94
IR     2025130    131400   -6.5100 -140.0600       4.3        44       238        95
IR     2025130    131400   -6.5100 -140.2000       5.3        44       236        91
IR     2025130    131400   -6.5800 -140.3100       5.1        35       211        91
IR     2025130    131400   -6.5800 -140.3300       5.2        36       209        89
IR     2025130    131400   -6.5200 -140.4600       5.0        33       203        94
IR     2025130    131400   -6.5400 -140.5100       5.3        36       200        88
IR     2025130    131400   -6.5200 -140.6200       4.7        42       188        80
IR     2025130    131400   -6.5800 -141.1300       4.1        52       158        64
IR     2025130    131400   -6.5800 -141.2200       4.6        78       165        63
IR     2025130    131400   -6.5600 -141.3100       5.3        87       168        78
IR     2025130    131400   -6.5800 -141.3800       4.6        87       169        75
IR     2025130    131400   -6.6800 -133.6500       4.5       185       746        92
IR     2025130    131400   -6.6100 -133.8000       4.4       175       799       100
IR     2025130    131400   -6.6100 -133.8900       4.6       166       835        91
IR     2025130    131400   -6.6600 -135.4800       4.3       206       312        70
IR     2025130    131400   -6.6800 -135.5700       4.3       200       294        75
IR     2025130    131400   -6.6600 -136.3000       4.2        86       199        75
IR     2025130    131400   -6.6700 -136.4100       6.0        91       199        97
IR     2025130    131400   -6.6200 -136.5400       5.8        86       196        83
IR     2025130    131400   -6.6400 -136.5700       5.5        84       194        86
IR     2025130    131400   -6.6700 -136.6500       5.1        77       189        88
IR     2025130    131400   -6.6000 -136.9700       6.2        67       182        98
IR     2025130    131400   -6.6200 -137.0100       6.5        64       180        99
IR     2025130    131400   -6.6200 -137.1000       6.8        64       172       100
IR     2025130    131400   -6.6700 -137.2600       5.9        67       170        97
IR     2025130    131400   -6.6700 -137.2800       6.1        67       170        96
IR     2025130    131400   -6.6200 -137.3900       4.7        61       169        89
IR     2025130    131400   -6.6700 -137.4800       4.4        48       174        92
IR     2025130    131400   -6.6000 -137.6300       5.3        31       182        92
IR     2025130    131400   -6.6700 -137.6800       5.7        31       183        99
IR     2025130    131400   -6.6500 -137.7400       5.9        28       186        99
IR     2025130    131400   -6.6500 -137.8500       6.3        23       190        93
IR     2025130    131400   -6.6000 -137.9400       6.8        20       195        93
IR     2025130    131400   -6.6000 -138.0800       6.0        11       208        99
IR     2025130    131400   -6.6000 -138.1200       5.9         8       210        98
IR     2025130    131400   -6.6000 -138.2600       6.3       354       227        97
IR     2025130    131400   -6.6200 -138.3000       6.2       357       417        84
IR     2025130    131400   -6.6500 -138.3700       5.5        13       423        91
IR     2025130    131400   -6.6000 -138.9900       5.0       341       302        99
IR     2025130    131400   -6.6000 -139.0800       6.2       351       293        99
IR     2025130    131400   -6.6000 -139.1500       6.4       359       288        99
IR     2025130    131400   -6.6700 -139.4800       6.7        46       213        69
IR     2025130    131400   -6.6700 -139.5000       7.2        48       213        70
IR     2025130    131400   -6.6700 -139.6600       6.1        42       215        96
IR     2025130    131400   -6.6700 -139.7500       5.4        28       222        97
IR     2025130    131400   -6.6700 -139.7700       5.3        27       223        97
IR     2025130    131400   -6.6700 -139.8900       4.0        51       234       100
IR     2025130    131400   -6.6000 -140.2600       4.9        35       222        95
IR     2025130    131400   -6.6200 -140.3500       5.5        30       206        91
IR     2025130    131400   -6.6200 -140.3800       5.5        25       203        89
IR     2025130    131400   -6.6700 -140.4700       6.5        23       190        96
IR     2025130    131400   -6.6500 -140.6400       6.4        24       189        89
IR     2025130    131400   -6.6700 -140.6900       6.1        21       184        93
IR     2025130    131400   -6.6700 -140.8400       4.2        23       167        90
IR     2025130    131400   -6.6000 -141.0000       4.0        21       161        90
IR     2025130    131400   -6.6200 -141.3200       4.8        85       174        83
IR     2025130    131400   -6.7700 -133.6900       5.9       173       779        90
IR     2025130    131400   -6.7700 -133.7400       6.0       174       780        95
IR     2025130    131400   -6.7700 -133.8700       6.7       172       790        90
IR     2025130    131400   -6.7700 -133.9100       6.9       168       794        96
IR     2025130    131400   -6.7300 -135.9400       4.0       136       228        91
IR     2025130    131400   -6.7100 -136.3000       4.7        83       198        79
IR     2025130    131400   -6.7300 -136.3400       4.7        89       198        86
IR     2025130    131400   -6.7700 -136.4800       6.2        93       191        78
IR     2025130    131400   -6.7500 -136.5000       6.7        91       190        81
IR     2025130    131400   -6.6900 -136.6500       5.6        79       188        87
IR     2025130    131400   -6.7300 -136.7000       4.7        78       190        74
IR     2025130    131400   -6.7500 -136.9600       5.3        76       182        99
IR     2025130    131400   -6.7300 -137.1200       6.6        65       172        98
IR     2025130    131400   -6.7300 -137.1600       6.1        63       172        93
IR     2025130    131400   -6.7600 -137.2300       5.5        64       175        94
IR     2025130    131400   -6.7600 -137.3500       4.8        59       174        90
IR     2025130    131400   -6.7600 -137.4100       4.5        59       177        92
IR     2025130    131400   -6.7500 -137.5200       4.4        48       174        94
IR     2025130    131400   -6.6900 -137.6600       5.7        33       180        99
IR     2025130    131400   -6.6900 -137.7400       5.9        29       185       100
IR     2025130    131400   -6.7600 -137.7700       5.9        25       185        99
IR     2025130    131400   -6.6900 -137.8600       6.7        21       190        91
IR     2025130    131400   -6.7300 -138.0300       7.4         2       208       100
IR     2025130    131400   -6.7600 -138.0800       7.3       356       213        97
IR     2025130    131400   -6.6900 -138.1900       6.0       354       216        97
IR     2025130    131400   -6.6900 -138.2300       5.7         0       221       100
IR     2025130    131400   -6.6900 -138.3400       5.8        26       421        93
IR     2025130    131400   -6.6900 -138.4100       5.4        38       421        84
IR     2025130    131400   -6.7100 -138.5000       4.5        45       325        83
IR     2025130    131400   -6.6900 -139.5100       7.8        50       214        86
IR     2025130    131400   -6.7100 -139.7100       5.9        25       218        88
IR     2025130    131400   -6.7300 -139.8600       5.4        37       231        97
IR     2025130    131400   -6.6900 -139.8800       4.7        47       233        99
IR     2025130    131400   -6.7100 -140.2700       5.4        48       203        95
IR     2025130    131400   -6.7600 -140.3100       5.1        52       199        94
IR     2025130    131400   -6.6900 -140.4700       6.8        23       189        97
IR     2025130    131400   -6.7100 -140.5500       7.9        20       190        87
IR     2025130    131400   -6.7600 -140.6400       7.8        28       182        91
IR     2025130    131400   -6.6900 -140.6900       6.4        20       182        96
IR     2025130    131400   -6.7100 -140.8400       4.8        24       167        93
IR     2025130    131400   -6.7300 -140.8500       4.6        26       167        92
IR     2025130    131400   -6.7900 -133.7100       6.0       174       781        99
IR     2025130    131400   -6.8300 -133.7400       5.8       178       782       100
IR     2025130    131400   -6.8100 -133.8700       6.4       174       790        93
IR     2025130    131400   -6.8300 -134.0000       6.0       163       352        62
IR     2025130    131400   -6.8200 -135.9200       4.9       137       264       100
IR     2025130    131400   -6.8600 -136.0100       4.6       140       215        94
IR     2025130    131400   -6.8600 -136.0300       4.4       138       211        95
IR     2025130    131400   -6.7800 -136.3000       4.1        86       199        72
IR     2025130    131400   -6.8200 -136.4600       4.8        98       193        79
IR     2025130    131400   -6.7800 -136.4800       5.9        93       191        76
IR     2025130    131400   -6.7800 -136.5900       6.2        85       189        75
IR     2025130    131400   -6.7800 -136.7000       4.0        75       193        77
IR     2025130    131400   -6.8600 -137.0800       8.0        66       179        96
IR     2025130    131400   -6.8400 -137.1700       7.1        63       184        73
IR     2025130    131400   -6.8200 -137.1900       6.6        64       184        77
IR     2025130    131400   -6.8000 -137.3000       5.4        61       184        94
IR     2025130    131400   -6.8000 -137.4100       4.4        59       180        92
IR     2025130    131400   -6.8200 -137.4800       4.5        50       178        96
IR     2025130    131400   -6.8400 -137.5500       4.8        43       177        99
IR     2025130    131400   -6.7800 -137.7200       6.0        32       178       100
IR     2025130    131400   -6.8000 -137.7700       5.7        27       184       100
IR     2025130    131400   -6.8600 -137.8300       6.2        19       184       100
IR     2025130    131400   -6.8200 -137.9900       7.4         3       205       100
IR     2025130    131400   -6.8600 -138.0400       7.0         4       208        96
IR     2025130    131400   -6.8600 -138.1000       6.6         1       213        96
IR     2025130    131400   -6.8500 -138.2400       6.3       356       223        93
IR     2025130    131400   -6.7800 -138.3200       6.3        11       245       100
IR     2025130    131400   -6.8500 -138.3900       8.8       352       250        99
IR     2025130    131400   -6.7800 -138.4600       7.5        20       256        97
IR     2025130    131400   -6.8000 -138.5700       6.3        13       254        77
IR     2025130    131400   -6.8000 -138.9000       4.4        17       243        74
IR     2025130    131400   -6.7800 -139.0800       7.5       346       277        96
IR     2025130    131400   -6.8500 -139.2400       8.3       334       274        98
IR     2025130    131400   -6.8500 -139.2800       8.5       343       264        97
IR     2025130    131400   -6.7800 -139.4200       7.9        14       264        73
IR     2025130    131400   -6.8500 -139.5100       7.5        30       272        81
IR     2025130    131400   -6.8200 -139.7700       6.4        18       219       100
IR     2025130    131400   -6.8500 -140.3300       5.8        41       208        82
IR     2025130    131400   -6.8200 -140.4400       6.2        32       188        84
IR     2025130    131400   -6.8500 -140.4600       6.4        33       187        79
IR     2025130    131400   -6.8500 -140.5600       7.2        29       182        85
IR     2025130    131400   -6.8000 -140.7100       7.0        30       175        98
IR     2025130    131400   -6.8200 -140.7300       6.7        33       174        96
IR     2025130    131400   -6.8000 -140.8200       5.7        31       169        98
IR     2025130    131400   -6.8900 -132.9200       4.0        97       218        94
IR     2025130    131400   -6.9600 -133.0100       4.1       103       221        94
IR     2025130    131400   -6.9000 -133.6300       5.1       195       781        89
IR     2025130    131400   -6.9600 -133.6900       4.5       193       779        92
IR     2025130    131400   -6.9600 -133.7800       4.0       191       768        94
IR     2025130    131400   -6.9000 -133.8300       4.3       188       773        99
IR     2025130    131400   -6.9000 -133.9300       4.4       174       780        97
IR     2025130    131400   -6.8800 -135.5700       4.8       200       300        92
IR     2025130    131400   -6.8800 -135.5900       4.7       204       298        90
IR     2025130    131400   -6.8800 -136.0100       4.8       139       216        99
IR     2025130    131400   -6.8800 -136.4400       4.1       114       193        84
IR     2025130    131400   -6.8700 -137.0600       7.7        67       179        97
IR     2025130    131400   -6.9300 -137.1900       6.1        65       184        69
IR     2025130    131400   -6.8700 -137.2100       6.2        64       185        75
IR     2025130    131400   -6.9100 -137.3200       5.2        56       187        87
IR     2025130    131400   -6.9300 -137.3900       4.4        49       189        86
IR     2025130    131400   -6.9100 -137.5200       5.2        33       186        97
IR     2025130    131400   -6.9300 -137.5700       5.3        32       184        99
IR     2025130    131400   -6.9500 -137.6600       6.2        25       179       100
IR     2025130    131400   -6.9500 -137.8300       6.1        24       181        99
IR     2025130    131400   -6.9500 -137.8400       6.2        21       182        99
IR     2025130    131400   -6.8700 -137.9900       7.0        10       203       100
IR     2025130    131400   -6.9300 -138.0300       6.5        12       203       100
IR     2025130    131400   -6.8700 -138.1200       6.5         3       213        98
IR     2025130    131400   -6.9500 -138.2800       6.3       348       238        98
IR     2025130    131400   -6.8900 -138.3300       8.0       353       246       100
IR     2025130    131400   -6.9100 -138.4400       8.9       348       254        99
IR     2025130    131400   -6.9100 -138.5500       8.3       351       261       100
IR     2025130    131400   -6.9300 -138.5700       7.7       350       262        98
IR     2025130    131400   -6.8900 -138.9700       5.8       344       253        95
IR     2025130    131400   -6.9300 -139.0100       6.2       328       255        93
IR     2025130    131400   -6.8700 -139.1000       8.7       331       280       100
IR     2025130    131400   -6.9500 -139.3500       7.6        11       253        79
IR     2025130    131400   -6.9300 -139.5100       6.8        38       268        76
IR     2025130    131400   -6.9100 -139.5300       6.8        34       273        79
IR     2025130    131400   -6.9500 -139.9800       4.6        46       288        98
IR     2025130    131400   -6.9500 -140.0400       4.1        44       291        90
IR     2025130    131400   -6.8900 -140.1800       4.8        50       288        77
IR     2025130    131400   -6.9500 -140.2400       5.1        46       286        77
IR     2025130    131400   -6.9300 -140.3800       6.1        33       209        87
IR     2025130    131400   -6.9500 -140.4200       6.1        31       208        86
IR     2025130    131400   -6.9100 -140.4900       6.4        28       188        79
IR     2025130    131400   -6.9500 -140.5800       6.1        32       183        90
IR     2025130    131400   -6.9500 -140.7100       5.9        43       178        97
IR     2025130    131400   -6.8700 -140.7600       5.7        39       173        94
IR     2025130    131400   -7.0300 -132.8600       4.7        89       222        93
IR     2025130    131400   -7.0500 -132.9100       4.5        91       227        94
IR     2025130    131400   -7.0500 -133.0000       4.0       102       228        94
IR     2025130    131400   -7.0100 -135.4000       4.7       192       306        95
IR     2025130    131400   -7.0200 -136.8400       5.0        57       200        90
IR     2025130    131400   -7.0200 -137.1500       6.1        68       184        76
IR     2025130    131400   -6.9800 -137.2400       4.3        58       187        69
IR     2025130    131400   -6.9700 -137.4100       4.1        40       191        86
IR     2025130    131400   -7.0400 -137.5200       5.4        27       194        98
IR     2025130    131400   -6.9800 -137.5500       5.5        29       191        99
IR     2025130    131400   -6.9700 -137.7000       6.1        25       180       100
IR     2025130    131400   -6.9700 -137.7200       6.0        31       180        96
IR     2025130    131400   -6.9700 -137.8600       6.2        17       183        99
IR     2025130    131400   -7.0400 -137.9200       5.7        19       186       100
IR     2025130    131400   -7.0400 -137.9900       5.6        23       189        98
IR     2025130    131400   -6.9600 -138.1000       5.2        13       211        98
IR     2025130    131400   -7.0200 -138.3900       7.1       347       249        98
IR     2025130    131400   -7.0200 -138.4200       8.3       348       254       100
IR     2025130    131400   -6.9600 -138.7100       5.2        35       249        66
IR     2025130    131400   -6.9600 -138.9300       6.7       337       252        89
IR     2025130    131400   -6.9800 -139.0100       8.0       326       255        93
IR     2025130    131400   -7.0200 -139.0400       9.5       326       307        95
IR     2025130    131400   -7.0000 -139.1500      11.0       331       308        87
IR     2025130    131400   -6.9600 -139.3000       8.1       357       253       100
IR     2025130    131400   -6.9600 -139.3100       7.9         2       240        99
IR     2025130    131400   -7.0000 -139.4400       6.2        48       255        86
IR     2025130    131400   -6.9600 -139.5500       5.7        37       272        86
IR     2025130    131400   -7.0400 -139.6600       5.3         8       307       100
IR     2025130    131400   -7.0200 -139.7500       5.0        20       288        94
IR     2025130    131400   -7.0400 -139.7700       5.3        25       292        91
IR     2025130    131400   -6.9800 -139.9100       5.5        49       287        95
IR     2025130    131400   -6.9600 -140.0000       4.4        43       293        95
IR     2025130    131400   -7.0400 -140.0400       4.4        38       305        85
IR     2025130    131400   -7.0200 -140.1500       4.5        25       300        80
IR     2025130    131400   -6.9600 -140.2400       4.9        40       286        76
IR     2025130    131400   -6.9600 -140.3600       5.8        26       209        84
IR     2025130    131400   -6.9600 -140.4400       6.1        29       208        79
IR     2025130    131400   -6.9800 -140.5500       6.0        23       191        71
IR     2025130    131400   -7.0400 -140.6500       5.6        35       208       100
IR     2025130    131400   -7.0200 -140.7500       5.3        41       201        97
IR     2025130    131400   -7.0400 -140.7600       5.4        38       214        95
IR     2025130    131400   -7.0200 -140.8700       4.3        48       206        92
IR     2025130    131400   -7.1100 -132.8900       4.7        96       228        93
IR     2025130    131400   -7.0900 -132.9900       4.1       101       229        96
IR     2025130    131400   -7.0700 -133.7000       4.1       201       765        91
IR     2025130    131400   -7.0800 -133.7200       4.0       202       761        90
IR     2025130    131400   -7.0800 -134.3600       4.4       186       359        99
IR     2025130    131400   -7.1400 -134.9800       4.0       167       304        98
IR     2025130    131400   -7.1300 -136.9900       7.2        69       196        70
IR     2025130    131400   -7.1300 -137.0600       6.6        60       194        86
IR     2025130    131400   -7.0600 -137.5200       5.3        26       196        99
IR     2025130    131400   -7.0800 -137.5700       5.5        21       195       100
IR     2025130    131400   -7.0800 -137.6800       6.5         2       193       100
IR     2025130    131400   -7.0900 -137.7300       6.1         3       193       100
IR     2025130    131400   -7.0600 -137.9000       6.0        14       186       100
IR     2025130    131400   -7.0600 -137.9300       5.7        23       186        99
IR     2025130    131400   -7.0900 -138.0600       5.9        18       185        95
IR     2025130    131400   -7.1300 -138.1300       5.8        14       191        91
IR     2025130    131400   -7.0700 -138.2200       5.2         1       215        89
IR     2025130    131400   -7.0900 -138.4600       9.4       352       251        96
IR     2025130    131400   -7.0700 -138.5300       9.2       345       257        95
IR     2025130    131400   -7.0600 -138.9500       8.2       333       255        87
IR     2025130    131400   -7.1300 -139.5700       4.4        54       344        86
IR     2025130    131400   -7.1300 -139.6600       5.1        17       345       100
IR     2025130    131400   -7.1100 -139.8000       6.1        25       318        97
IR     2025130    131400   -7.1300 -139.8600       5.7        20       355        94
IR     2025130    131400   -7.1300 -139.9100       5.2        37       338        89
IR     2025130    131400   -7.0500 -140.2700       4.7        17       290        88
IR     2025130    131400   -7.0500 -140.4400       6.1        22       210        69
IR     2025130    131400   -7.0900 -140.5300       6.7        20       214        79
IR     2025130    131400   -7.0500 -140.7800       5.6        36       224        94
IR     2025130    131400   -7.0500 -140.8000       5.7        38       230        94
IR     2025130    131400   -7.0500 -140.9600       4.7        60       232        84
IR     2025130    131400   -7.1300 -141.0500       5.9        54       232        76
IR     2025130    131400   -7.2300 -132.8400       4.5       105       219        95
IR     2025130    131400   -7.2200 -132.9500       4.1       107       222        99
IR     2025130    131400   -7.1900 -133.5700       4.0       193       749        98
IR     2025130    131400   -7.2100 -133.7200       4.4       203       732        98
IR     2025130    131400   -7.1900 -134.2900       4.4       180       357        99
IR     2025130    131400   -7.1900 -134.8500       4.3       158       324        97
IR     2025130    131400   -7.1900 -134.9600       4.1       169       311       100
IR     2025130    131400   -7.2100 -135.0500       4.1       174       335        99
IR     2025130    131400   -7.2100 -136.4000       4.3       253       303        67
IR     2025130    131400   -7.2100 -136.4600       4.6       266       301        71
IR     2025130    131400   -7.2200 -137.1100       6.4        58       191        87
IR     2025130    131400   -7.2200 -137.1900       4.7        52       191        63
IR     2025130    131400   -7.1500 -138.0800       6.5        15       183        95
IR     2025130    131400   -7.2200 -138.1300       6.9        14       189        96
IR     2025130    131400   -7.1700 -138.2200       7.1         7       210        85
IR     2025130    131400   -7.1800 -138.4400       9.1         3       240        97
IR     2025130    131400   -7.2200 -138.5500       7.1         5       249        88
IR     2025130    131400   -7.2000 -138.6200       5.0         6       253        73
IR     2025130    131400   -7.1500 -139.0600       7.0       331       343        84
IR     2025130    131400   -7.1700 -139.0800       6.9       332       355        89
IR     2025130    131400   -7.1500 -139.6800       5.1        21       351       100
IR     2025130    131400   -7.2000 -139.9300       5.3        33       366        90
IR     2025130    131400   -7.2000 -140.5300       4.7        20       294        77
IR     2025130    131400   -7.2000 -140.5600       4.8        18       284        90
IR     2025130    131400   -7.1500 -140.7100       6.4        14       250        88
IR     2025130    131400   -7.1800 -140.7800       6.8        15       285        98
IR     2025130    131400   -7.1500 -140.8400       7.4        27       285        86
IR     2025130    131400   -7.2000 -140.9800       8.1        46       281        87
IR     2025130    131400   -7.1500 -141.0500       6.6        53       233        76
IR     2025130    131400   -7.2000 -141.1800       7.7       360       233        82
IR     2025130    131400   -7.1800 -141.2000       6.9       354       241        84
IR     2025130    131400   -7.2800 -134.2900       4.4       175       363        98
IR     2025130    131400   -7.3200 -134.6900       4.9       157       382        98
IR     2025130    131400   -7.3000 -134.7600       5.3       165       374        95
IR     2025130    131400   -7.3000 -134.8200       5.3       169       366        97
IR     2025130    131400   -7.2600 -134.9600       4.9       177       326       100
IR     2025130    131400   -7.2600 -135.0000       5.0       181       341        99
IR     2025130    131400   -7.3200 -135.2000       4.1       183       378        67
IR     2025130    131400   -7.2400 -137.1100       6.5        58       190        91
IR     2025130    131400   -7.2400 -137.8400       5.2       357       199       100
IR     2025130    131400   -7.2600 -137.9900       5.6        20       179        99
IR     2025130    131400   -7.3100 -138.0200       5.5        20       180        98
IR     2025130    131400   -7.2400 -138.1500       7.0        14       192        99
IR     2025130    131400   -7.2900 -138.1900       6.9        12       208        97
IR     2025130    131400   -7.3100 -138.2800       7.3         3       236        96
IR     2025130    131400   -7.2900 -138.4000       6.2         4       238        92
IR     2025130    131400   -7.2800 -138.5300       7.1         8       246        98
IR     2025130    131400   -7.3100 -138.5500       5.2         7       244        97
IR     2025130    131400   -7.2400 -138.8200       4.8        28       283        77
IR     2025130    131400   -7.2700 -139.6900       4.5        37       379        75
IR     2025130    131400   -7.2600 -140.6500       4.6       360       284        91
IR     2025130    131400   -7.3100 -140.7600       7.2       351       335        98
IR     2025130    131400   -7.3100 -140.7800       7.5       353       354        99
IR     2025130    131400   -7.2900 -140.8700       8.2         3       406        97
IR     2025130    131400   -7.2400 -141.0400       9.3        37       246        72
IR     2025130    131400   -7.2600 -141.1100       9.4        21       241        92
IR     2025130    131400   -7.2400 -141.1400       8.8        11       235        86
IR     2025130    131400   -7.2400 -141.4000       7.2       348       220        77
IR     2025130    131400   -7.4100 -134.5200       4.2       159       385        98
IR     2025130    131400   -7.4100 -134.5400       4.3       159       385        99
IR     2025130    131400   -7.3900 -134.6500       4.9       158       389       100
IR     2025130    131400   -7.3700 -134.7200       5.1       162       387        99
IR     2025130    131400   -7.3400 -134.8200       5.1       172       380        95
IR     2025130    131400   -7.3400 -134.9300       4.6       176       374        91
IR     2025130    131400   -7.3600 -135.0300       4.9       181       388       100
IR     2025130    131400   -7.4100 -135.0900       5.2       182       391       100
IR     2025130    131400   -7.4100 -135.1800       5.4       193       390        71
IR     2025130    131400   -7.3700 -135.3300       4.8       202       242        80
IR     2025130    131400   -7.4100 -135.4400       6.2       207       368        92
IR     2025130    131400   -7.4100 -135.4900       6.2       213       386        94
IR     2025130    131400   -7.3900 -135.5600       5.3       219       391        89
IR     2025130    131400   -7.4100 -135.6400       4.2       230       386        80
IR     2025130    131400   -7.3700 -137.1000       5.3        72       187        86
IR     2025130    131400   -7.3900 -137.1100       5.1        74       187        85
IR     2025130    131400   -7.3700 -137.2800       5.0        59       188        70
IR     2025130    131400   -7.3700 -137.3000       4.8        59       189        70
IR     2025130    131400   -7.3300 -137.4400       4.1        48       205        89
IR     2025130    131400   -7.3900 -137.8800       4.1        19       204        97
IR     2025130    131400   -7.4000 -137.9700       4.8        25       195       100
IR     2025130    131400   -7.4000 -138.0400       4.9        22       183        98
IR     2025130    131400   -7.3700 -138.1900       6.2        10       210        99
IR     2025130    131400   -7.4000 -138.3900       4.5       345       230        86
IR     2025130    131400   -7.3300 -138.5300       5.2       356       243       100
IR     2025130    131400   -7.4000 -138.8800       4.9        79       322        86
IR     2025130    131400   -7.4000 -139.7100       4.3        18       383        75
IR     2025130    131400   -7.4000 -140.6000       5.2       327       295        96
IR     2025130    131400   -7.3700 -140.6200       4.6       325       289        94
IR     2025130    131400   -7.3700 -140.7600       8.2       343       501        89
IR     2025130    131400   -7.4000 -140.8000       9.2       339       517        98
IR     2025130    131400   -7.3300 -140.9300      10.5       357       423       100
IR     2025130    131400   -7.4000 -141.0500      13.7         1       448        99
IR     2025130    131400   -7.3800 -141.0700      13.6         4       441        97
IR     2025130    131400   -7.4900 -132.8900       4.4       104       202        92
IR     2025130    131400   -7.4700 -133.1400       4.3       106       227        97
IR     2025130    131400   -7.4700 -133.2200       4.1       103       231        99
IR     2025130    131400   -7.4700 -133.2700       4.0       100       234        98
IR     2025130    131400   -7.4900 -134.1700       4.3       142       341        98
IR     2025130    131400   -7.4500 -134.2600       4.6       147       376        99
IR     2025130    131400   -7.4300 -134.5000       4.2       161       386        95
IR     2025130    131400   -7.4900 -134.6100       5.0       157       392        98
IR     2025130    131400   -7.4300 -134.6700       5.1       162       391        99
IR     2025130    131400   -7.4300 -134.8000       5.0       175       400        92
IR     2025130    131400   -7.5000 -134.8900       5.7       188       436        82
IR     2025130    131400   -7.4500 -135.0000       5.3       187       406        91
IR     2025130    131400   -7.4300 -135.0500       5.3       184       401        98
IR     2025130    131400   -7.4500 -135.1600       5.6       190       397        77
IR     2025130    131400   -7.5000 -135.2700       6.6       206       381        82
IR     2025130    131400   -7.5000 -135.3100       7.0       203       371        91
IR     2025130    131400   -7.5000 -135.4500       6.5       206       410        94
IR     2025130    131400   -7.4200 -137.2400       4.8        60       194        80
IR     2025130    131400   -7.5000 -138.0000       4.5        24       193        99
IR     2025130    131400   -7.5000 -138.1700       4.9         4       239        99
IR     2025130    131400   -7.5000 -138.1900       4.8         1       250        98
IR     2025130    131400   -7.4200 -138.3100       5.9       352       242        93
IR     2025130    131400   -7.4400 -138.4000       4.2       336       230        82
IR     2025130    131400   -7.4400 -138.4900       4.4       342       243        89
IR     2025130    131400   -7.4200 -138.8800       5.6        70       318        94
IR     2025130    131400   -7.4800 -139.4400       4.2        60       407        88
IR     2025130    131400   -7.4200 -139.7100       4.6        12       384        83
IR     2025130    131400   -7.4900 -140.4000       5.4       347       312        80
IR     2025130    131400   -7.4200 -140.5800       5.5       332       296        95
IR     2025130    131400   -7.4200 -140.6700       6.4       336       298        92
IR     2025130    131400   -7.4200 -140.8200       9.6       337       527        98
IR     2025130    131400   -7.4800 -140.8500      11.2       338       534        97
IR     2025130    131400   -7.4200 -141.0200      13.7       357       484        99
IR     2025130    131400   -7.4200 -141.0400      13.5       358       471        99
IR     2025130    131400   -7.5300 -132.9800       4.3       105       214        91
IR     2025130    131400   -7.5400 -133.1600       4.2       107       235        98
IR     2025130    131400   -7.5800 -134.1000       5.0       130       333        99
IR     2025130    131400   -7.5800 -134.2300       5.9       131       358        98
IR     2025130    131400   -7.5600 -134.2600       5.6       150       373        90
IR     2025130    131400   -7.6000 -134.3900       6.0       174       381        93
IR     2025130    131400   -7.5600 -134.5000       5.5       174       385        98
IR     2025130    131400   -7.5600 -134.6100       4.9       163       393       100
IR     2025130    131400   -7.5800 -134.7000       5.2       168       405        94
IR     2025130    131400   -7.5600 -134.7200       5.0       169       413        95
IR     2025130    131400   -7.5200 -134.8700       5.8       187       444        82
IR     2025130    131400   -7.5800 -134.9200       6.3       192       423        90
IR     2025130    131400   -7.5900 -135.0700       6.5       192       454        97
IR     2025130    131400   -7.5900 -135.0900       6.6       193       442        97
IR     2025130    131400   -7.5400 -135.2500       6.6       208       419        83
IR     2025130    131400   -7.5900 -135.2700       7.3       209       421        92
IR     2025130    131400   -7.5900 -135.4100       6.5       208       409       100
IR     2025130    131400   -7.5200 -135.4700       6.3       209       410        92
IR     2025130    131400   -7.5200 -135.5400       5.5       221       405        88
IR     2025130    131400   -7.5900 -137.4200       5.2        50       203        94
IR     2025130    131400   -7.5700 -137.4800       5.3        52       202        95
IR     2025130    131400   -7.5200 -137.5900       4.6        52       226        99
IR     2025130    131400   -7.5300 -137.9700       4.5        28       195        99
IR     2025130    131400   -7.5100 -138.0000       4.4        25       193        99
IR     2025130    131400   -7.5500 -138.1500       4.7         7       219        97
IR     2025130    131400   -7.5300 -138.1700       4.7         4       224        98
IR     2025130    131400   -7.5900 -138.2800       5.9       346       322        97
IR     2025130    131400   -7.5900 -138.3700       6.6       340       416        98
IR     2025130    131400   -7.5900 -138.4600       6.5       342       242        98
IR     2025130    131400   -7.5300 -139.4900       4.0        46       399        91
IR     2025130    131400   -7.5100 -139.5800       4.8        19       391        96
IR     2025130    131400   -7.5900 -140.4000       6.2       357       306        82
IR     2025130    131400   -7.5900 -140.4900       7.9       356       303        89
IR     2025130    131400   -7.5900 -140.5100       8.3       356       303        92
IR     2025130    131400   -7.5100 -140.6400       8.3       343       309        92
IR     2025130    131400   -7.5100 -140.9100      11.3       342       578        93
IR     2025130    131400   -7.5100 -140.9500      10.6       345       578        91
IR     2025130    131400   -7.5900 -141.1800       4.9        63       211        77
IR     2025130    131400   -7.6700 -132.8600       5.5        94       224        97
IR     2025130    131400   -7.6700 -132.9000       4.9        97       225        96
IR     2025130    131400   -7.6900 -133.8400       4.4       104       309        88
IR     2025130    131400   -7.6900 -133.8900       4.8       108       317        88
IR     2025130    131400   -7.6700 -134.0600       5.1       127       335        99
IR     2025130    131400   -7.6700 -134.0800       5.2       128       337        99
IR     2025130    131400   -7.6100 -134.2400       6.1       136       365        98
IR     2025130    131400   -7.6100 -134.2600       6.0       144       369        96
IR     2025130    131400   -7.6900 -134.5200       7.2       180       726        99
IR     2025130    131400   -7.6300 -134.8300       6.6       173       441        96
IR     2025130    131400   -7.6100 -134.8800       7.1       185       446        96
IR     2025130    131400   -7.6700 -135.0300       7.3       189       475        99
IR     2025130    131400   -7.6300 -135.1000       7.3       196       448        98
IR     2025130    131400   -7.6300 -135.2100       7.2       204       433        95
IR     2025130    131400   -7.6300 -135.2700       7.6       205       421        96
IR     2025130    131400   -7.6700 -135.3200       8.3       199       411        90
IR     2025130    131400   -7.6100 -135.4100       6.4       206       410       100
IR     2025130    131400   -7.6100 -137.4400       5.4        52       202        95
IR     2025130    131400   -7.6100 -137.4600       5.4        53       203        96
IR     2025130    131400   -7.6600 -137.6200       4.8        68       252        87
IR     2025130    131400   -7.6600 -137.6400       4.2        66       260        85
IR     2025130    131400   -7.6400 -138.0900       4.0        11       213        99
IR     2025130    131400   -7.6800 -138.1800       4.1       360       285        99
IR     2025130    131400   -7.6100 -138.3500       6.6       341       419        98
IR     2025130    131400   -7.6200 -138.3800       7.1       334       430        98
IR     2025130    131400   -7.6100 -138.4600       6.7       341       244        97
IR     2025130    131400   -7.6800 -138.8900       5.6        10       319        98
IR     2025130    131400   -7.6000 -139.6200       5.5        23       389        95
IR     2025130    131400   -7.6000 -140.1600       5.5       359       339        98
IR     2025130    131400   -7.6400 -140.2700       5.1        11       322        80
IR     2025130    131400   -7.6000 -140.4200       6.7       360       302        83
IR     2025130    131400   -7.6000 -140.4900       8.1       356       299        91
IR     2025130    131400   -7.6200 -140.5300       9.0       357       299        92
IR     2025130    131400   -7.6800 -140.6200      10.3       356       376        98
IR     2025130    131400   -7.6600 -140.7800      10.0       358       455        99
IR     2025130    131400   -7.6000 -140.8200      11.6       350       517        87
IR     2025130    131400   -7.6800 -140.8900       9.8       356       450        81
IR     2025130    131400   -7.6800 -141.0500       6.1       344       398        63
IR     2025130    131400   -7.6000 -141.1600       4.4        50       394        66
IR     2025130    131400   -7.7300 -132.9000       4.6        96       232        91
IR     2025130    131400   -7.7300 -133.8400       4.5       107       306        79
IR     2025130    131400   -7.7100 -133.8900       5.1       107       316        89
IR     2025130    131400   -7.7100 -134.0600       5.4       128       338        99
IR     2025130    131400   -7.7100 -134.0800       5.4       129       340        99
IR     2025130    131400   -7.7400 -134.2400       6.3       139       363       100
IR     2025130    131400   -7.7800 -134.4800       7.3       184       727        98
IR     2025130    131400   -7.7800 -134.5700       7.6       175       747       100
IR     2025130    131400   -7.7800 -134.6600       8.6       167       766       100
IR     2025130    131400   -7.7800 -134.7500       8.5       163       776        97
IR     2025130    131400   -7.7000 -134.8600       8.5       173       747        82
IR     2025130    131400   -7.7800 -134.9500       5.5       180       549        98
IR     2025130    131400   -7.7400 -135.0300       6.6       190       498        96
IR     2025130    131400   -7.7200 -135.0700       7.2       191       480        99
IR     2025130    131400   -7.7200 -135.1600       7.0       197       442        97
IR     2025130    131400   -7.7000 -135.2500       7.5       199       419        93
IR     2025130    131400   -7.7200 -135.3900       6.5       195       407        84
IR     2025130    131400   -7.7700 -136.9600       4.1       293       353        93
IR     2025130    131400   -7.7200 -137.2900       4.0        35       252        70
IR     2025130    131400   -7.7400 -137.4000       5.4        56       208        87
IR     2025130    131400   -7.7700 -137.5100       6.0        79       203        89
IR     2025130    131400   -7.7700 -137.6200       6.6        88       205        93
IR     2025130    131400   -7.7500 -137.6600       5.7        90       205        83
IR     2025130    131400   -7.7700 -137.8000       4.5       119       222        75
IR     2025130    131400   -7.7700 -138.1700       4.1         2       223       100
IR     2025130    131400   -7.7500 -138.1800       4.3         1       241       100
IR     2025130    131400   -7.7200 -138.2900       5.7       340       382        92
IR     2025130    131400   -7.7500 -138.4000       8.0       323       430        93
IR     2025130    131400   -7.7200 -138.4600       8.0       324       419        94
IR     2025130    131400   -7.7300 -139.8700       7.5        40       376        93
IR     2025130    131400   -7.7500 -139.9600       7.6        31       357        99
IR     2025130    131400   -7.7500 -140.0200       7.7        24       349        99
IR     2025130    131400   -7.7100 -140.1600       5.4        13       333        87
IR     2025130    131400   -7.7500 -140.2200       6.9         9       326       100
IR     2025130    131400   -7.7500 -140.3500       7.7        11       565        62
IR     2025130    131400   -7.7300 -140.4400       9.2       354       288        98
IR     2025130    131400   -7.7500 -140.5100      10.2       354       289        99
IR     2025130    131400   -7.7000 -140.5500      10.4       354       324        99
IR     2025130    131400   -7.7500 -140.6500      10.5       354       444        92
IR     2025130    131400   -7.7700 -140.8000       9.4         3       452        93
IR     2025130    131400   -7.7700 -140.8500       8.8       355       438        79
IR     2025130    131400   -7.7500 -140.9800       8.4       343       404        81
IR     2025130    131400   -7.7300 -141.0200       7.8       339       399        75
IR     2025130    131400   -7.7700 -141.0900       7.0       342       398        78
IR     2025130    131400   -7.7700 -141.2500       6.6        40       389        91
IR     2025130    131400   -7.8000 -133.3400       4.2       115       228        94
IR     2025130    131400   -7.8400 -133.3900       4.5       117       254        95
IR     2025130    131400   -7.8400 -133.5200       4.3       121       265        97
IR     2025130    131400   -7.8200 -133.6000       4.0       129       272        97
IR     2025130    131400   -7.8400 -133.6500       4.3       132       276        99
IR     2025130    131400   -7.8000 -133.8700       5.4       118       309        64
IR     2025130    131400   -7.8200 -133.9100       5.9       120       314        64
IR     2025130    131400   -7.8000 -134.0200       6.2       116       335        98
IR     2025130    131400   -7.8000 -134.1100       6.1       125       344        94
IR     2025130    131400   -7.8200 -134.2000       6.4       127       359        97
IR     2025130    131400   -7.8000 -134.3300       7.2       174       766       100
IR     2025130    131400   -7.8700 -134.3900       7.5       177       762       100
IR     2025130    131400   -7.8500 -134.5300       8.0       172       751        99
IR     2025130    131400   -7.8000 -134.5500       7.6       176       750       100
IR     2025130    131400   -7.8300 -134.7000       8.7       164       775       100
IR     2025130    131400   -7.8000 -134.7700       7.9       162       774        95
IR     2025130    131400   -7.8700 -134.9000       5.7       177       587        92
IR     2025130    131400   -7.8300 -134.9400       5.2       177       538        98
IR     2025130    131400   -7.8300 -135.0100       5.3       182       455        98
IR     2025130    131400   -7.8100 -135.1000       5.8       196       427        99
IR     2025130    131400   -7.8000 -135.1900       7.0       201       409        96
IR     2025130    131400   -7.8300 -135.3400       5.6       205       400        81
IR     2025130    131400   -7.7900 -135.4500       4.0       208       400        69
IR     2025130    131400   -7.7900 -136.9600       4.0       292       351        94
IR     2025130    131400   -7.7900 -137.4700       5.9        76       206        87
IR     2025130    131400   -7.8300 -137.5500       7.3        86       196        97
IR     2025130    131400   -7.7900 -137.6000       7.0        88       203        92
IR     2025130    131400   -7.7900 -137.6900       6.0       100       173        86
IR     2025130    131400   -7.8600 -138.2600       4.6       340       311        97
IR     2025130    131400   -7.8100 -138.3700       6.4       320       419        83
IR     2025130    131400   -7.8600 -138.8900       8.3        18       271        86
IR     2025130    131400   -7.8600 -139.4600       4.2        40       334        98
IR     2025130    131400   -7.8100 -139.5100       4.6        39       366        98
IR     2025130    131400   -7.8600 -139.6200       5.9        43       360        87
IR     2025130    131400   -7.7900 -139.8400       6.7        46       372        91
IR     2025130    131400   -7.8200 -139.9500       7.2        23       352       100
IR     2025130    131400   -7.8100 -140.0200       8.7        17       343        99
IR     2025130    131400   -7.8200 -140.3300       8.3         7       305        98
IR     2025130    131400   -7.7900 -140.3800       8.9       359       288        95
IR     2025130    131400   -7.8100 -140.4400       9.9       356       287        94
IR     2025130    131400   -7.8200 -140.6000      10.8       350       438        99
IR     2025130    131400   -7.8100 -140.7800       9.5         0       452       100
IR     2025130    131400   -7.7900 -140.8700       9.0       353       428        82
IR     2025130    131400   -7.8200 -140.9600       8.7       339       405        92
IR     2025130    131400   -7.8100 -141.0500       7.7       329       399        89
IR     2025130    131400   -7.8100 -141.2200       5.3        20       395        91
IR     2025130    131400   -7.8100 -141.2400       5.6        30       394        90
IR     2025130    131400   -7.7900 -141.3800       9.3        69       200        87
IR     2025130    131400   -7.9300 -132.8800       4.2        84       229        93
IR     2025130    131400   -7.9500 -133.2400       5.0       113       215        93
IR     2025130    131400   -7.9700 -133.2600       5.3       112       223        95
IR     2025130    131400   -7.9300 -133.3500       4.8       116       240        99
IR     2025130    131400   -7.9500 -133.5000       5.2       119       257        99
IR     2025130    131400   -7.9700 -133.5600       5.1       124       261        97
IR     2025130    131400   -7.9300 -133.6300       5.3       126       269        96
IR     2025130    131400   -7.9600 -133.9400      10.0       168       804        83
IR     2025130    131400   -7.8900 -134.0000       6.3       120       338        90
IR     2025130    131400   -7.9300 -134.1500       8.3       157       793        99
IR     2025130    131400   -7.9100 -134.2200       7.8       163       775        98
IR     2025130    131400   -7.8900 -134.3500       7.6       173       769       100
IR     2025130    131400   -7.8900 -134.4400       7.8       176       749        99
IR     2025130    131400   -7.9300 -134.5300       8.9       167       771       100
IR     2025130    131400   -7.9400 -134.6000       8.9       162       777       100
IR     2025130    131400   -7.9100 -134.6400       8.2       164       778        98
IR     2025130    131400   -7.9600 -134.8100       4.4       173       601        94
IR     2025130    131400   -7.9100 -134.8800       5.3       177       567        95
IR     2025130    131400   -7.8900 -134.9300       4.9       176       446        94
IR     2025130    131400   -7.9200 -135.0100       4.1       177       403        74
IR     2025130    131400   -7.9600 -135.2300       5.0       209       393        95
IR     2025130    131400   -7.9600 -135.3000       4.5       215       397        78
IR     2025130    131400   -7.9400 -136.0700       6.7       210       349        97
IR     2025130    131400   -7.9600 -136.0900       6.7       210       338        97
IR     2025130    131400   -7.9400 -137.4400       7.2        83       233        82
IR     2025130    131400   -7.9200 -137.5300       9.1        81       168        89
IR     2025130    131400   -7.8800 -137.5800       9.5        83       166        87
IR     2025130    131400   -7.9400 -137.7500       5.1        49       120        71
IR     2025130    131400   -7.9500 -138.2500       4.6       331       270       100
IR     2025130    131400   -7.9200 -138.3100       4.3       320       325        97
IR     2025130    131400   -7.9400 -138.9800       4.4        45       260        86
IR     2025130    131400   -7.9500 -139.0200       4.7        48       260        87
IR     2025130    131400   -7.9500 -139.5100       6.1        26       323        94
IR     2025130    131400   -7.9000 -139.5800       5.9        41       342        88
IR     2025130    131400   -7.8800 -139.6200       5.8        43       354        85
IR     2025130    131400   -7.9500 -139.7100       5.8        50       350        96
IR     2025130    131400   -7.8800 -139.8200       4.8        54       358        98
IR     2025130    131400   -7.9500 -140.1300      13.1       357       333        99
IR     2025130    131400   -7.9200 -140.4200      10.8       354       288        99
IR     2025130    131400   -7.9000 -140.7300      10.3       343       444        99
IR     2025130    131400   -7.9200 -140.7500      10.7       346       444        99
IR     2025130    131400   -7.9000 -140.8400       9.1       341       428        96
IR     2025130    131400   -7.8800 -141.0000       7.8       329       399        96
IR     2025130    131400   -7.8800 -141.0200       7.5       325       398        93
IR     2025130    131400   -7.8800 -141.1800       4.2         2       307        87
IR     2025130    131400   -7.9500 -141.2700       5.7        50       207        98
IR     2025130    131400   -7.9400 -141.3500       8.3        58       208        78
IR     2025130    131400   -8.0200 -133.2800       5.9       109       231        94
IR     2025130    131400   -8.0200 -133.3500       5.8       114       241        99
IR     2025130    131400   -7.9800 -133.5000       5.5       118       255        99
IR     2025130    131400   -7.9800 -133.5200       5.4       119       257        99
IR     2025130    131400   -7.9800 -133.6100       5.2       124       266        98
IR     2025130    131400   -8.0600 -133.7200       5.3       133       275        95
IR     2025130    131400   -8.0600 -133.8700       8.8       157       805       100
IR     2025130    131400   -7.9800 -133.9200       9.7       160       804        98
IR     2025130    131400   -7.9800 -134.2200       9.7       161       792        99
IR     2025130    131400   -8.0000 -134.2400      10.0       160       796       100
IR     2025130    131400   -7.9800 -134.4000       9.4       166       790        99
IR     2025130    131400   -8.0200 -134.4900       9.8       157       796        98
IR     2025130    131400   -8.0000 -134.5800       9.5       158       795        98
IR     2025130    131400   -7.9800 -134.6400       7.8       164       784        95
IR     2025130    131400   -8.0500 -134.7500       4.9       179       570        77
IR     2025130    131400   -8.0000 -134.8600       4.6       174       414        98
IR     2025130    131400   -7.9800 -134.8800       4.5       171       411        99
IR     2025130    131400   -8.0500 -134.9700       5.2       168       395        84
IR     2025130    131400   -7.9800 -135.6300       4.0       208       414        98
IR     2025130    131400   -8.0300 -135.9800       4.7       209       419        92
IR     2025130    131400   -7.9800 -136.1000       6.2       207       338        94
IR     2025130    131400   -8.0100 -137.3800       5.7        91       270        77
IR     2025130    131400   -7.9900 -137.4200       7.3        86       239        85
IR     2025130    131400   -7.9700 -137.5100       9.8        79       157        87
IR     2025130    131400   -8.0100 -137.6200      11.2        70       126        81
IR     2025130    131400   -8.0100 -137.7100       8.1        39       119        63
IR     2025130    131400   -8.0300 -137.7800       8.2       348       111        83
IR     2025130    131400   -8.0500 -137.8700       7.1       325       110        61
IR     2025130    131400   -7.9900 -138.0400       4.5       290       198        76
IR     2025130    131400   -8.0500 -138.1300       5.7       312       208        96
IR     2025130    131400   -7.9700 -138.2400       4.5       334       255        96
IR     2025130    131400   -8.0100 -138.3100       4.9       319       307        99
IR     2025130    131400   -8.0100 -138.7800       4.4        14       485        74
IR     2025130    131400   -8.0500 -138.8400       5.3        12       482        79
IR     2025130    131400   -7.9700 -139.0000       4.1        52       258        80
IR     2025130    131400   -8.0100 -139.2700       4.0        37       364       100
IR     2025130    131400   -7.9700 -139.5500       6.2        31       324        86
IR     2025130    131400   -7.9700 -139.6900       6.0        41       349        91
IR     2025130    131400   -8.0500 -139.7300       6.8        27       347        89
IR     2025130    131400   -8.0300 -139.8900       6.2        26       347        83
IR     2025130    131400   -7.9900 -139.9800       7.7        12       342        88
IR     2025130    131400   -8.0500 -140.4000      13.7       356       429        85
IR     2025130    131400   -8.0500 -140.4700      13.4       356       292        90
IR     2025130    131400   -7.9700 -140.6700      12.0       339       444        96
IR     2025130    131400   -7.9900 -140.6900      10.8       340       442        92
IR     2025130    131400   -7.9900 -140.9500       6.6         9       204        96
IR     2025130    131400   -8.0100 -140.9600       6.4        19       208        94
IR     2025130    131400   -8.0500 -141.0900       4.0        30       209        92
IR     2025130    131400   -8.0100 -141.3100       7.8        55       196        92
IR     2025130    131400   -8.1100 -133.1500       4.6       103       221        79
IR     2025130    131400   -8.1100 -133.1700       4.6       105       224        82
IR     2025130    131400   -8.0800 -133.2800       5.6       107       232        95
IR     2025130    131400   -8.1000 -133.3900       6.0       111       243        98
IR     2025130    131400   -8.0800 -133.4400       6.6       110       248        98
IR     2025130    131400   -8.1100 -133.5400       6.2       110       256        98
IR     2025130    131400   -8.1500 -133.6600       6.0       112       266        97
IR     2025130    131400   -8.0800 -133.7200       5.0       132       274        93
IR     2025130    131400   -8.0900 -133.8100       8.4       156       801       100
IR     2025130    131400   -8.1500 -134.0900      10.2       165       806        98
IR     2025130    131400   -8.0900 -134.5300       9.7       158       802        95
IR     2025130    131400   -8.1500 -134.6600       5.9       185       741        72
IR     2025130    131400   -8.0900 -134.7500       5.1       175       550        87
IR     2025130    131400   -8.1500 -134.7700       4.6       182       532        83
IR     2025130    131400   -8.0700 -134.8900       5.3       169       403        89
IR     2025130    131400   -8.1500 -134.9700       5.3       166       392        67
IR     2025130    131400   -8.1400 -135.5700       4.6       225       396        93
IR     2025130    131400   -8.1300 -135.6100       5.0       223       358        94
IR     2025130    131400   -8.0700 -136.1000       4.4       210       355        85
IR     2025130    131400   -8.0700 -136.6100       4.0       161       328        96
IR     2025130    131400   -8.1400 -137.2900       4.8       105       306        75
IR     2025130    131400   -8.1400 -137.4000       6.9        79       168        86
IR     2025130    131400   -8.0800 -137.4500       9.0        79       157        84
IR     2025130    131400   -8.0700 -137.5400      11.3        74       134        79
IR     2025130    131400   -8.1000 -137.8000      10.6       355       105        83
IR     2025130    131400   -8.0700 -137.8500       9.2       336       107        65
IR     2025130    131400   -8.0700 -138.0500       7.7       300       200        85
IR     2025130    131400   -8.0800 -138.1400       7.0       317       213        98
IR     2025130    131400   -8.0700 -138.2500       4.9       326       269        96
IR     2025130    131400   -8.1400 -138.2700       5.5       326       270        97
IR     2025130    131400   -8.1400 -138.3800       5.2       326       334        98
IR     2025130    131400   -8.0800 -138.8200       6.1        18       482        90
IR     2025130    131400   -8.1000 -138.9300       4.1        46       251        82
IR     2025130    131400   -8.1000 -139.3300       5.2        23       288       100
IR     2025130    131400   -8.1000 -139.4400       6.9        16       295        96
IR     2025130    131400   -8.1400 -139.7500       6.7        21       347        89
IR     2025130    131400   -8.1400 -139.7600       7.0        20       348        91
IR     2025130    131400   -8.0600 -139.9300       6.7        22       347        85
IR     2025130    131400   -8.1000 -140.3300      13.9       350       428        87
IR     2025130    131400   -8.0800 -140.3600      13.9       354       428        84
IR     2025130    131400   -8.1200 -140.5300      12.6         0       463        88
IR     2025130    131400   -8.1400 -140.6000      10.9         4       510        85
IR     2025130    131400   -8.1400 -140.7100      10.3        50       348        95
IR     2025130    131400   -8.1400 -140.7300      10.1        52       362        97
IR     2025130    131400   -8.1200 -140.8700       8.2        30       397        98
IR     2025130    131400   -8.0600 -141.0700       4.7        32       210        96
IR     2025130    131400   -8.0800 -141.2400       6.0        50       201        90
IR     2025130    131400   -8.0800 -141.3100       8.3        55       185        92
IR     2025130    131400   -8.1700 -133.0400       4.2        99       203        76
IR     2025130    131400   -8.1900 -133.0900       4.7       103       204        78
IR     2025130    131400   -8.1700 -133.1800       4.7       107       222        89
IR     2025130    131400   -8.1900 -133.2900       5.7       109       230        98
IR     2025130    131400   -8.2200 -133.3500       6.2       105       238        99
IR     2025130    131400   -8.2400 -133.5100       6.8        96       247        99
IR     2025130    131400   -8.2200 -133.5700       6.0       100       251        99
IR     2025130    131400   -8.1700 -133.7000       5.7       115       266        98
IR     2025130    131400   -8.1700 -133.7200       5.5       118       266        98
IR     2025130    131400   -8.1900 -133.8100       8.4       157       797        98
IR     2025130    131400   -8.2200 -133.9700       8.7       165       780        99
IR     2025130    131400   -8.2000 -134.0300       8.8       167       797        99
IR     2025130    131400   -8.2400 -134.0800       8.9       166       795       100
IR     2025130    131400   -8.2000 -134.7300       5.3       182       568        81
IR     2025130    131400   -8.2400 -134.8400       5.7       177       423        84
IR     2025130    131400   -8.2400 -134.8600       5.6       175       417        81
IR     2025130    131400   -8.2400 -135.5500       4.4       218       393        99
IR     2025130    131400   -8.1800 -135.5900       5.7       224       381        89
IR     2025130    131400   -8.2200 -135.6600       7.0       224       349        87
IR     2025130    131400   -8.1800 -135.7700       5.0       221       421       100
IR     2025130    131400   -8.2000 -135.9400       4.8       210       423       100
IR     2025130    131400   -8.2000 -136.1000       4.1       190       361        92
IR     2025130    131400   -8.1800 -136.5900       5.3       156       317        96
IR     2025130    131400   -8.2300 -136.7000       5.6       146       289        98
IR     2025130    131400   -8.2300 -136.8700       6.0       143       251        92
IR     2025130    131400   -8.2300 -136.9400       7.7       143       258        94
IR     2025130    131400   -8.2300 -137.0500       9.8       134       297        86
IR     2025130    131400   -8.2000 -137.1400       7.2       127       316        93
IR     2025130    131400   -8.2300 -137.2100       8.1       123       301        92
IR     2025130    131400   -8.2100 -137.3100       6.4       104       238        94
IR     2025130    131400   -8.1600 -137.4000       7.0        80       167       100
IR     2025130    131400   -8.1600 -137.4500       8.0        83       152        70
IR     2025130    131400   -8.2100 -137.5400       8.8        78       132        82
IR     2025130    131400   -8.1600 -137.6900       9.9        40       116        84
IR     2025130    131400   -8.1600 -137.7800      11.3         3       108        82
IR     2025130    131400   -8.1900 -137.8500      10.8       354       107        88
IR     2025130    131400   -8.2100 -137.9800      11.4       328       158        71
IR     2025130    131400   -8.1900 -138.0500      10.9       313       208        82
IR     2025130    131400   -8.1600 -138.1600       8.1       317       248        97
IR     2025130    131400   -8.1900 -138.1800       8.0       321       303        99
IR     2025130    131400   -8.2300 -138.2700       6.9       324       300        99
IR     2025130    131400   -8.1900 -138.3600       6.6       330       321        97
IR     2025130    131400   -8.2300 -138.8700       6.2        23       242        98
IR     2025130    131400   -8.1900 -139.0400       5.5        23       262        99
IR     2025130    131400   -8.2300 -139.0700       7.2        19       282       100
IR     2025130    131400   -8.2300 -139.1400       7.2        16       277        99
IR     2025130    131400   -8.1700 -139.4200       6.4        16       294        98
IR     2025130    131400   -8.2300 -139.6500       6.3        26       337        94
IR     2025130    131400   -8.1700 -139.7600       7.3        20       349        90
IR     2025130    131400   -8.2300 -139.9100       7.2        16       367        92
IR     2025130    131400   -8.1700 -140.0900       8.6       349       386        98
IR     2025130    131400   -8.2300 -140.1800      10.7       333       380        89
IR     2025130    131400   -8.1600 -140.3100      13.5       345       428        93
IR     2025130    131400   -8.2300 -140.4000      11.9       349       428        97
IR     2025130    131400   -8.1600 -140.4700      13.0         0       446        88
IR     2025130    131400   -8.1700 -140.6200      10.8        24       431        74
IR     2025130    131400   -8.1600 -140.7100      11.0        53       370        98
IR     2025130    131400   -8.1600 -140.7500      10.7        54       373        99
IR     2025130    131400   -8.1900 -140.8700       9.6        34       350        99
IR     2025130    131400   -8.2100 -140.9600       9.0        36       309        94
IR     2025130    131400   -8.2100 -141.2200       9.0        47       187        99
IR     2025130    131400   -8.1600 -141.2700       7.8        50       181        88
IR     2025130    131400   -8.3400 -132.8800       4.5        86       193        98
IR     2025130    131400   -8.3000 -133.0500       4.9        94       202        93
IR     2025130    131400   -8.2800 -133.0700       4.8        97       202        93
IR     2025130    131400   -8.2800 -133.2200       4.6       111       213        95
IR     2025130    131400   -8.3400 -133.3300       5.6       110       231        98
IR     2025130    131400   -8.3400 -133.3500       5.7       108       232        97
IR     2025130    131400   -8.3000 -133.4600       6.2       104       242        99
IR     2025130    131400   -8.2600 -133.5700       6.3        97       247       100
IR     2025130    131400   -8.3300 -133.6400       5.3       102       244       100
IR     2025130    131400   -8.3000 -133.7900       7.0       164       771        99
IR     2025130    131400   -8.3000 -133.8300       7.0       164       772        98
IR     2025130    131400   -8.2600 -133.9600       8.3       166       775        99
IR     2025130    131400   -8.3100 -133.9900       8.3       168       767        98
IR     2025130    131400   -8.2800 -134.0800       8.7       168       784       100
IR     2025130    131400   -8.2600 -134.1900      10.7       160       805        99
IR     2025130    131400   -8.2600 -134.6200       7.8       180       801        81
IR     2025130    131400   -8.2800 -134.7100       5.8       179       650        68
IR     2025130    131400   -8.3300 -134.8400       5.9       175       413        76
IR     2025130    131400   -8.3100 -134.8700       5.4       172       407        77
IR     2025130    131400   -8.3100 -134.9600       5.1       192       383        73
IR     2025130    131400   -8.2900 -135.5900       6.0       214       387       100
IR     2025130    131400   -8.3100 -135.6800       6.4       216       410        97
IR     2025130    131400   -8.3300 -135.7100       5.5       213       412        96
IR     2025130    131400   -8.2500 -135.7900       6.2       219       427        95
IR     2025130    131400   -8.3300 -135.9000       4.1       200       417        95
IR     2025130    131400   -8.3100 -136.0100       5.7       191       376        99
IR     2025130    131400   -8.3100 -136.1000       6.3       177       355        90
IR     2025130    131400   -8.2900 -136.2100       6.6       172       337        83
IR     2025130    131400   -8.2700 -136.3200       5.6       180       321        92
IR     2025130    131400   -8.3300 -136.5700       6.3       132       288        91
IR     2025130    131400   -8.3300 -136.6300       6.7       135       274        99
IR     2025130    131400   -8.3300 -136.7000       6.4       139       225        98
IR     2025130    131400   -8.3200 -136.7900       6.5       153       182        84
IR     2025130    131400   -8.3200 -136.9200       8.3       139       186        93
IR     2025130    131400   -8.2500 -137.2900       8.1       118       275        75
IR     2025130    131400   -8.3100 -137.3600       7.7       106       182        98
IR     2025130    131400   -8.3200 -137.4000       7.6       104       168        99
IR     2025130    131400   -8.2900 -137.5600       8.2        77       131        97
IR     2025130    131400   -8.3200 -137.5800       7.4        81       130        93
IR     2025130    131400   -8.2500 -137.7400       9.0        31       116        81
IR     2025130    131400   -8.3200 -137.8300      10.1        15       132        75
IR     2025130    131400   -8.3000 -137.9200      10.7       355       159        84
IR     2025130    131400   -8.2900 -138.0000      11.7       335       222        91
IR     2025130    131400   -8.2700 -138.0300      11.2       326       253        92
IR     2025130    131400   -8.2500 -138.2000       8.7       321       335       100
IR     2025130    131400   -8.2500 -138.2200       8.3       323       328       100
IR     2025130    131400   -8.3000 -138.9100       5.9        31       251        96
IR     2025130    131400   -8.2700 -138.9800       7.3        27       257        97
IR     2025130    131400   -8.2500 -139.0700       7.7        17       273       100
IR     2025130    131400   -8.2500 -139.1800       8.1        13       282        99
IR     2025130    131400   -8.3200 -139.4700       9.9         9       661       100
IR     2025130    131400   -8.3200 -139.5400       6.9        31       333        77
IR     2025130    131400   -8.2500 -139.6500       6.4        28       337        94
IR     2025130    131400   -8.3000 -139.7100       7.3        29       346        95
IR     2025130    131400   -8.2500 -139.8400       7.7        17       359        96
IR     2025130    131400   -8.2500 -139.9300       7.0        13       369        92
IR     2025130    131400   -8.2800 -139.9600       7.5         8       366        96
IR     2025130    131400   -8.3200 -140.0500       8.5       357       361        98
IR     2025130    131400   -8.3200 -140.2200       9.3       348       361        88
IR     2025130    131400   -8.3200 -140.2400       9.2       348       364        87
IR     2025130    131400   -8.2800 -140.4900      11.9        13       430        87
IR     2025130    131400   -8.3000 -140.5600      11.5        29       421        87
IR     2025130    131400   -8.3000 -140.6400       9.9        41       389        84
IR     2025130    131400   -8.2800 -140.9100       9.5        30       306        93
IR     2025130    131400   -8.2800 -141.0200       9.5        39       252        88
IR     2025130    131400   -8.2800 -141.0700       9.2        42       201        94
IR     2025130    131400   -8.2500 -141.2000       9.6        46       188        98
IR     2025130    131400   -8.2800 -141.2900       8.8        48       186        93
IR     2025130    131400   -8.2800 -141.3100       8.7        50       185        93
IR     2025130    131400   -8.4300 -132.8100       4.3        83       199        86
IR     2025130    131400   -8.4300 -132.9600       4.8        82       202        91
IR     2025130    131400   -8.4300 -132.9800       4.8        82       203        90
IR     2025130    131400   -8.4300 -133.1400       5.3        92       209        91
IR     2025130    131400   -8.4300 -133.1600       5.4        93       209        92
IR     2025130    131400   -8.3700 -133.3100       5.6       111       229        97
IR     2025130    131400   -8.3500 -133.3600       5.6       109       234        96
IR     2025130    131400   -8.3500 -133.4600       5.4       110       240       100
IR     2025130    131400   -8.4300 -133.7500       5.7       175       763       100
IR     2025130    131400   -8.3500 -133.8600       6.4       172       759        96
IR     2025130    131400   -8.3500 -133.9400       6.9       169       751        98
IR     2025130    131400   -8.3700 -133.9900       6.6       168       760        98
IR     2025130    131400   -8.3500 -134.1400       8.2       166       773       100
IR     2025130    131400   -8.3500 -134.1700       9.4       164       781       100
IR     2025130    131400   -8.4200 -134.2600      14.9       151       389        72
IR     2025130    131400   -8.3500 -134.5600      10.1       165       800        64
IR     2025130    131400   -8.3900 -134.6900       9.3       179       410        61
IR     2025130    131400   -8.3500 -134.7600       6.7       178       537        71
IR     2025130    131400   -8.3500 -134.8500       5.7       174       402        73
IR     2025130    131400   -8.3900 -134.8900       5.4       180       385        73
IR     2025130    131400   -8.3800 -135.1300       4.0       241       380        70
IR     2025130    131400   -8.3500 -135.6000       7.6       212       401       100
IR     2025130    131400   -8.3500 -135.7000       5.7       212       413        98
IR     2025130    131400   -8.3500 -135.7100       5.3       210       413        97
IR     2025130    131400   -8.3600 -135.8100       4.5       195       415        98
IR     2025130    131400   -8.3600 -136.0600       4.8       172       354        76
IR     2025130    131400   -8.3600 -136.0800       5.4       169       354        82
IR     2025130    131400   -8.3800 -136.2400       7.9       166       344        92
IR     2025130    131400   -8.4000 -136.2600       7.6       164       340        94
IR     2025130    131400   -8.3800 -136.3500       6.6       163       338        94
IR     2025130    131400   -8.3400 -136.5900       6.7       129       280        96
IR     2025130    131400   -8.3400 -136.7000       6.7       136       189        97
IR     2025130    131400   -8.3400 -136.7200       6.5       140       185        96
IR     2025130    131400   -8.3400 -136.8300       6.9       145       181        81
IR     2025130    131400   -8.3400 -136.9400       8.7       139       186        91
IR     2025130    131400   -8.4200 -137.1600      11.6       134       238        76
IR     2025130    131400   -8.4200 -137.4100       6.7       101       179        68
IR     2025130    131400   -8.4200 -137.4300       6.7       100       172        67
IR     2025130    131400   -8.4000 -137.6000       6.2        76       131        71
IR     2025130    131400   -8.4200 -137.6100       6.1        68       132        70
IR     2025130    131400   -8.4000 -137.8300       8.1        24       160        63
IR     2025130    131400   -8.4100 -137.9600       8.1       358       253        92
IR     2025130    131400   -8.3600 -138.2200       9.1       316       350        84
IR     2025130    131400   -8.3400 -138.9400       7.5        32       259        99
IR     2025130    131400   -8.4100 -139.0300       9.0        24       294        94
IR     2025130    131400   -8.3400 -139.1100       8.6        15       265        96
IR     2025130    131400   -8.3400 -139.3300       9.2         9       251        99
IR     2025130    131400   -8.3900 -139.4700      10.5         9       662       100
IR     2025130    131400   -8.3800 -139.7100       8.5        21       351        97
IR     2025130    131400   -8.3600 -139.9800       7.9       358       361        99
IR     2025130    131400   -8.3800 -140.0900       9.8       356       359        97
IR     2025130    131400   -8.4100 -140.1300      11.1         1       352        89
IR     2025130    131400   -8.3600 -140.3600       9.7        13       369        87
IR     2025130    131400   -8.4100 -140.4900      12.0        39       385        93
IR     2025130    131400   -8.3900 -140.6000      10.3        35       387       100
IR     2025130    131400   -8.3800 -140.6700       9.4        37       366       100
IR     2025130    131400   -8.4100 -140.9300       6.6        19       242        67
IR     2025130    131400   -8.3600 -141.0200       8.0        39       208        75
IR     2025130    131400   -8.3600 -141.1300       7.7        49       192        93
IR     2025130    131400   -8.3400 -141.1800       8.5        47       191        95
IR     2025130    131400   -8.3800 -141.3100       7.1        45       190        83
IR     2025130    131400   -8.5000 -132.9500       4.5        86       211        97
IR     2025130    131400   -8.5000 -132.9900       4.6        86       214        92
IR     2025130    131400   -8.5000 -133.1200       5.3        92       220        94
IR     2025130    131400   -8.4800 -133.1800       5.8        93       219        96
IR     2025130    131400   -8.5000 -133.2500       6.3        98       227        96
IR     2025130    131400   -8.4600 -133.3600       5.6       111       234        92
IR     2025130    131400   -8.5200 -133.7800       5.5       173       767        99
IR     2025130    131400   -8.5000 -133.8200       5.4       174       762       100
IR     2025130    131400   -8.5000 -133.9000       5.1       172       751       100
IR     2025130    131400   -8.5200 -134.0400       4.6       165       763        97
IR     2025130    131400   -8.5000 -134.1700      10.1       149       375        67
IR     2025130    131400   -8.4400 -134.2800      15.3       151       395        70
IR     2025130    131400   -8.5100 -134.6700       8.5       189       426        69
IR     2025130    131400   -8.4800 -134.7600       7.7       179       416        71
IR     2025130    131400   -8.4400 -134.8300       6.6       180       392        71
IR     2025130    131400   -8.5000 -134.9400       6.6       188       380        80
IR     2025130    131400   -8.5100 -135.0200       5.7       193       377        76
IR     2025130    131400   -8.4600 -135.5300       4.2       193       380       100
IR     2025130    131400   -8.5100 -136.4600       8.3       106       268        91
IR     2025130    131400   -8.5100 -136.5500       9.9       102       190        99
IR     2025130    131400   -8.4500 -136.6100       9.7        98       188        75
IR     2025130    131400   -8.4400 -136.6600       8.6       112       182        99
IR     2025130    131400   -8.4500 -136.8300       6.3       129       178        77
IR     2025130    131400   -8.4500 -136.9200       7.6       133       182        81
IR     2025130    131400   -8.4500 -136.9400       7.8       135       183        85
IR     2025130    131400   -8.4300 -137.1000      11.9       137       210        98
IR     2025130    131400   -8.4500 -137.1900       9.8       134       246        67
IR     2025130    131400   -8.4500 -137.2800       7.3       125       226        68
IR     2025130    131400   -8.5100 -137.3200       5.3       114       224        66
IR     2025130    131400   -8.4300 -137.4300       6.4       100       179        80
IR     2025130    131400   -8.5100 -137.4800       5.6        73       187        79
IR     2025130    131400   -8.4900 -137.5800       5.6        57       154        72
IR     2025130    131400   -8.4900 -137.7400       5.2        45       160        61
IR     2025130    131400   -8.4500 -137.9000       6.8        10       205        85
IR     2025130    131400   -8.4300 -137.9400       7.6         3       243        91
IR     2025130    131400   -8.5100 -138.0300       4.2       346       333        96
IR     2025130    131400   -8.5100 -138.9800       7.3        31       316        96
IR     2025130    131400   -8.4500 -139.0200       8.2        30       300        95
IR     2025130    131400   -8.5100 -139.1300       7.8        17       268        99
IR     2025130    131400   -8.4900 -139.2000       8.6        11       265       100
IR     2025130    131400   -8.4900 -139.3100      10.2        13       265        99
IR     2025130    131400   -8.5100 -139.4500       6.6        26       308        95
IR     2025130    131400   -8.5100 -139.5400       6.5        34       309        93
IR     2025130    131400   -8.4300 -139.8900       8.6         0       369       100
IR     2025130    131400   -8.4500 -140.0200       9.5       354       358        96
IR     2025130    131400   -8.4700 -140.0700      10.9       352       361        93
IR     2025130    131400   -8.4300 -140.4000      10.0        31       377        99
IR     2025130    131400   -8.5000 -140.4400      11.5        44       377        90
IR     2025130    131400   -8.4300 -140.5800      10.2        32       382        99
IR     2025130    131400   -8.4900 -140.8200       7.8         3       278        95
IR     2025130    131400   -8.4700 -140.8500       7.3         4       256        87
IR     2025130    131400   -8.4300 -140.9500       6.4        20       221        66
IR     2025130    131400   -8.5000 -141.1100       5.3        60       197        89
IR     2025130    131400   -8.5000 -141.1500       5.8        57       198        90
IR     2025130    131400   -8.5400 -132.9900       4.2        91       218        93
IR     2025130    131400   -8.5600 -133.1400       5.5        95       218        97
IR     2025130    131400   -8.5900 -133.1700       5.8        96       210        99
IR     2025130    131400   -8.5400 -133.2700       6.3        97       225        96
IR     2025130    131400   -8.5600 -133.3400       6.0       102       228        93
IR     2025130    131400   -8.5400 -133.7800       5.4       173       764        98
IR     2025130    131400   -8.5400 -133.8000       5.3       174       762        99
IR     2025130    131400   -8.5700 -133.9100       4.4       164       758        91
IR     2025130    131400   -8.5400 -134.0600       4.2       163       762        93
IR     2025130    131400   -8.6100 -134.0800       6.4       147       353        96
IR     2025130    131400   -8.5300 -134.2100      11.9       152       381        67
IR     2025130    131400   -8.5500 -134.5000       6.3       203       430        66
IR     2025130    131400   -8.5300 -134.5200       8.2       201       431        64
IR     2025130    131400   -8.5700 -134.6500       7.7       191       429        72
IR     2025130    131400   -8.5900 -134.7800       6.7       187       406        88
IR     2025130    131400   -8.5700 -134.8700       5.7       187       383        85
IR     2025130    131400   -8.5500 -134.9000       6.0       185       381        77
IR     2025130    131400   -8.6100 -135.0100       6.7       192       386        72
IR     2025130    131400   -8.6100 -135.1400       5.0       212       396        88
IR     2025130    131400   -8.5300 -135.6200       4.1       205       386        77
IR     2025130    131400   -8.6000 -136.3700      12.9        93       233        96
IR     2025130    131400   -8.5300 -136.4600       8.8       103       261        90
IR     2025130    131400   -8.6000 -136.5000      12.2        94       179        99
IR     2025130    131400   -8.5500 -136.6300      12.9        96       178        98
IR     2025130    131400   -8.5300 -136.6600      13.1        93       178        89
IR     2025130    131400   -8.5800 -136.7500      12.9        93       173        97
IR     2025130    131400   -8.5300 -136.9200       8.4       127       181        91
IR     2025130    131400   -8.5300 -137.3200       4.9       113       223        68
IR     2025130    131400   -8.5400 -137.4300       4.8        78       205        94
IR     2025130    131400   -8.5300 -137.5000       5.6        72       193        88
IR     2025130    131400   -8.5800 -137.6300       4.5        59       182       100
IR     2025130    131400   -8.5800 -137.6700       4.2        56       181        99
IR     2025130    131400   -8.5800 -138.2700       5.1       109       247        79
IR     2025130    131400   -8.5200 -138.9800       7.1        32       324        95
IR     2025130    131400   -8.5800 -139.0900       7.9        16       320        95
IR     2025130    131400   -8.6000 -139.1400       9.4         8       311        98
IR     2025130    131400   -8.5400 -139.2700       9.8        10       270        98
IR     2025130    131400   -8.5200 -139.2900      10.0        13       270        99
IR     2025130    131400   -8.5200 -139.4500       6.9        31       305        96
IR     2025130    131400   -8.5200 -139.4700       6.5        35       304        93
IR     2025130    131400   -8.5200 -139.9600      11.5       358       365        97
IR     2025130    131400   -8.5200 -140.0500      11.5       349       359        86
IR     2025130    131400   -8.5200 -140.1300      11.3       356       349        82
IR     2025130    131400   -8.5400 -140.1600      10.8         2       349        88
IR     2025130    131400   -8.5200 -140.2700      10.8        22       347        99
IR     2025130    131400   -8.5600 -140.4200      10.2        41       340        81
IR     2025130    131400   -8.5600 -140.4500       9.5        40       367        77
IR     2025130    131400   -8.5400 -140.5800       7.8        19       374        72
IR     2025130    131400   -8.5800 -140.6900       7.6         3       330       100
IR     2025130    131400   -8.5400 -140.8700       6.7         5       219        98
IR     2025130    131400   -8.6000 -141.0400       5.7        31       198        97
IR     2025130    131400   -8.5800 -141.0500       5.5        36       198        95
IR     2025130    131400   -8.5800 -141.3100       4.5        11       279        89
IR     2025130    131400   -8.6300 -133.0400       4.0       102       220        91
IR     2025130    131400   -8.6700 -133.3400       6.0        92       213        99
IR     2025130    131400   -8.7000 -133.4300       5.6        82       214        91
IR     2025130    131400   -8.7000 -133.6900       4.5       113       217        87
IR     2025130    131400   -8.7000 -133.7800       4.9       108       219        89
IR     2025130    131400   -8.6300 -133.8900       5.0       153       765        81
IR     2025130    131400   -8.6800 -134.0600       5.4       145       344        90
IR     2025130    131400   -8.6600 -134.2000       8.4       151       389        85
IR     2025130    131400   -8.6800 -134.3000       7.5       156       395        80
IR     2025130    131400   -8.7000 -134.3300       5.5       171       414        78
IR     2025130    131400   -8.6800 -134.4100       5.6       188       433        79
IR     2025130    131400   -8.7000 -134.5700       6.1       196       432        83
IR     2025130    131400   -8.6600 -134.6300       7.0       193       432        82
IR     2025130    131400   -8.7000 -134.7400       5.8       191       426        92
IR     2025130    131400   -8.6600 -134.7900       6.6       192       403        97
IR     2025130    131400   -8.6600 -134.9000       6.6       185       380        86
IR     2025130    131400   -8.6600 -135.0300       6.6       193       402        80
IR     2025130    131400   -8.6800 -135.2300       4.2       226       409        81
IR     2025130    131400   -8.6800 -135.4500       4.1       183       413        91
IR     2025130    131400   -8.6800 -135.8900       5.7        97       265        97
IR     2025130    131400   -8.6200 -136.0200      11.1        98       308        74
IR     2025130    131400   -8.6800 -136.2400      14.6        95       179       100
IR     2025130    131400   -8.6800 -136.3700      14.2        90       174        98
IR     2025130    131400   -8.6800 -136.3900      14.1        90       174        96
IR     2025130    131400   -8.6400 -136.4800      12.6        94       176        98
IR     2025130    131400   -8.6200 -136.5700      15.0        93       176       100
IR     2025130    131400   -8.6200 -136.6600      15.6        91       172        99
IR     2025130    131400   -8.6600 -136.8100       9.6        97       166        93
IR     2025130    131400   -8.6600 -136.9200       6.7       127       169        88
IR     2025130    131400   -8.6200 -137.0600       9.4       137       183        70
IR     2025130    131400   -8.6600 -137.4500       4.5        79       187        80
IR     2025130    131400   -8.6500 -137.5000       5.1        72       186        91
IR     2025130    131400   -8.6900 -137.5700       4.4        60       187        83
IR     2025130    131400   -8.6900 -138.1800       6.0       104       216        94
IR     2025130    131400   -8.6500 -138.2000       5.7       108       262        92
IR     2025130    131400   -8.6400 -138.2900       6.2       106       162        86
IR     2025130    131400   -8.6500 -139.0900       7.6         7       329       100
IR     2025130    131400   -8.6200 -139.1600      10.2         4       313       100
IR     2025130    131400   -8.6300 -139.2500      11.0       358       312        96
IR     2025130    131400   -8.6700 -139.2900      10.7         1       335        94
IR     2025130    131400   -8.6900 -139.4200       7.1        19       292        99
IR     2025130    131400   -8.6500 -139.5400       4.8        43       286        98
IR     2025130    131400   -8.6700 -139.5600       4.5        37       286        91
IR     2025130    131400   -8.6300 -139.8500      13.1         9       364        99
IR     2025130    131400   -8.6300 -139.9400      12.8         1       367        96
IR     2025130    131400   -8.6700 -140.0700      11.4       348       364        90
IR     2025130    131400   -8.6900 -140.1600      10.5       354       355        77
IR     2025130    131400   -8.6500 -140.2500       8.9         8       337        90
IR     2025130    131400   -8.6300 -141.0000       6.1        28       197        99
IR     2025130    131400   -8.6200 -141.0200       5.8        27       196        98
IR     2025130    131400   -8.6900 -141.1800       6.5        22       266        97
IR     2025130    131400   -8.6700 -141.2200       6.1        15       269        86
IR     2025130    131400   -8.6500 -141.2900       4.9        14       280        76
IR     2025130    131400   -8.8000 -133.1700       4.0       109       204        99
IR     2025130    131400   -8.8000 -133.3000       4.8        93       210       100
IR     2025130    131400   -8.8000 -133.3200       5.0        91       210        99
IR     2025130    131400   -8.7200 -133.4700       5.4        84       216        88
IR     2025130    131400   -8.7800 -133.5000       5.3        88       213        80
IR     2025130    131400   -8.7900 -133.6300       4.9       101       214        88
IR     2025130    131400   -8.7900 -133.7000       5.2       108       216        90
IR     2025130    131400   -8.7900 -133.8200       5.3       110       218        98
IR     2025130    131400   -8.7900 -133.8700       4.4       110       771        98
IR     2025130    131400   -8.7600 -133.9800       4.0       142       331        95
IR     2025130    131400   -8.7200 -134.0700       5.6       149       362        89
IR     2025130    131400   -8.7200 -134.5300       5.9       196       432        82
IR     2025130    131400   -8.7200 -134.6400       5.8       193       430        87
IR     2025130    131400   -8.7500 -134.6800       5.3       186       425        89
IR     2025130    131400   -8.7400 -134.7900       6.0       190       389        94
IR     2025130    131400   -8.7200 -134.8700       5.9       184       380        92
IR     2025130    131400   -8.7300 -134.9600       6.2       182       384        96
IR     2025130    131400   -8.7900 -135.1000       5.9       201       414        98
IR     2025130    131400   -8.7200 -135.1600       4.5       217       406        97
IR     2025130    131400   -8.7900 -135.2100       5.9       205       393        87
IR     2025130    131400   -8.7300 -135.3800       4.6       193       414        99
IR     2025130    131400   -8.7100 -136.1300      13.5       101       190        97
IR     2025130    131400   -8.7300 -136.1500      14.0       101       184        97
IR     2025130    131400   -8.7100 -136.2400      14.8        97       176       100
IR     2025130    131400   -8.7100 -136.3300      14.5        91       173        99
IR     2025130    131400   -8.7100 -136.4200      14.1        91       171        93
IR     2025130    131400   -8.7100 -136.5300      13.7        91       163        96
IR     2025130    131400   -8.7100 -136.6800      14.5        95       159        99
IR     2025130    131400   -8.7100 -136.7700      12.0        95       158        99
IR     2025130    131400   -8.7100 -136.8400       7.1       110       157        97
IR     2025130    131400   -8.7300 -137.2100       5.7       130       174        66
IR     2025130    131400   -8.7100 -137.4800       4.7        78       182        85
IR     2025130    131400   -8.7100 -137.5700       4.3        61       186        87
IR     2025130    131400   -8.7300 -138.1200       5.1        95       269        89
IR     2025130    131400   -8.7100 -138.1600       5.9       100       219        94
IR     2025130    131400   -8.7500 -138.2700       7.5        97       116        64
IR     2025130    131400   -8.7800 -138.3600       6.6        85       109        60
IR     2025130    131400   -8.7100 -139.0700       6.2       358       317        98
IR     2025130    131400   -8.7100 -139.1600       9.3       357       335       100
IR     2025130    131400   -8.7100 -139.3200      10.4         6       301        97
IR     2025130    131400   -8.7100 -139.4000       7.8        15       296       100
IR     2025130    131400   -8.7100 -139.5100       4.9        43       285        99
IR     2025130    131400   -8.7800 -139.5600       4.9        21       283        99
IR     2025130    131400   -8.7100 -139.8500      13.6        11       358        97
IR     2025130    131400   -8.7800 -139.9300      11.6       359       365        99
IR     2025130    131400   -8.7800 -139.9800      11.3       353       363        95
IR     2025130    131400   -8.7100 -140.0900      11.4       351       364        84
IR     2025130    131400   -8.7800 -140.2200       9.2         3       345        96
IR     2025130    131400   -8.7800 -140.2500       8.9         7       350        97
IR     2025130    131400   -8.7800 -140.3300       8.9        14       340        98
IR     2025130    131400   -8.7800 -141.1300       8.7        34       228        86
IR     2025130    131400   -8.7100 -141.1800       6.9        23       265        98
IR     2025130    131400   -8.7800 -141.2700       8.5        35       284       100
IR     2025130    131400   -8.8700 -133.3300       5.3        85       214        99
IR     2025130    131400   -8.8500 -133.4100       5.9        83       215        96
IR     2025130    131400   -8.8500 -133.5700       5.2        99       215        89
IR     2025130    131400   -8.8900 -133.6500       5.5       109       215        93
IR     2025130    131400   -8.8300 -133.7400       5.4       111       216        96
IR     2025130    131400   -8.8300 -133.8100       5.3       114       217        95
IR     2025130    131400   -8.8100 -133.8700       4.3       117       768        97
IR     2025130    131400   -8.8700 -134.0900       5.2       156       386        86
IR     2025130    131400   -8.8900 -134.2000       6.1       162       391        82
IR     2025130    131400   -8.8800 -134.2700       5.4       169       390        94
IR     2025130    131400   -8.8500 -134.4000       5.2       169       429        85
IR     2025130    131400   -8.8100 -134.4400       4.8       178       431        86
IR     2025130    131400   -8.8300 -134.5300       5.0       176       431        79
IR     2025130    131400   -8.8100 -134.6800       5.4       178       419        89
IR     2025130    131400   -8.8600 -134.7500       6.1       178       374        83
IR     2025130    131400   -8.8500 -134.8400       6.2       180       372        80
IR     2025130    131400   -8.8600 -134.8800       6.3       185       368        87
IR     2025130    131400   -8.8800 -134.9900       6.8       192       384       100
IR     2025130    131400   -8.8300 -135.1200       6.4       198       412       100
IR     2025130    131400   -8.8800 -135.2100       5.6       181       377        99
IR     2025130    131400   -8.8600 -135.2500       5.3       178       379        99
IR     2025130    131400   -8.8100 -135.5200       4.5       165       335       100
IR     2025130    131400   -8.8100 -135.9800      10.5        92       200        99
IR     2025130    131400   -8.8100 -136.0400      11.6        98       193        99
IR     2025130    131400   -8.8800 -136.1800      11.6       105       173        96
IR     2025130    131400   -8.8600 -136.2000      12.2       105       172        95
IR     2025130    131400   -8.8000 -136.3100      15.0        93       168        94
IR     2025130    131400   -8.8000 -136.4600      13.9        92       156        96
IR     2025130    131400   -8.8800 -136.5500      14.2       102       145        99
IR     2025130    131400   -8.8600 -136.6000      13.8       102       146        99
IR     2025130    131400   -8.8000 -136.7100      11.4       101       151        99
IR     2025130    131400   -8.8600 -136.8100       7.2       110       145       100
IR     2025130    131400   -8.8800 -136.8400       5.5       116       140        98
IR     2025130    131400   -8.8000 -137.0800       5.2       136       132        63
IR     2025130    131400   -8.8400 -137.1900       5.2       124       132        63
IR     2025130    131400   -8.8800 -137.4100       4.3       110       160        67
IR     2025130    131400   -8.8400 -137.5200       4.0        95       166        69
IR     2025130    131400   -8.8000 -138.0700       4.1        97       231        93
IR     2025130    131400   -8.8000 -138.1200       6.1        96       189        96
IR     2025130    131400   -8.8700 -138.2500       9.3        67       104        96
IR     2025130    131400   -8.8000 -138.3800       6.6        79       107        66
IR     2025130    131400   -8.8700 -138.4700       8.3         4       103        92
IR     2025130    131400   -8.8400 -138.5000       4.8       345       104        94
IR     2025130    131400   -8.8000 -139.1800       7.1       354       324        97
IR     2025130    131400   -8.8000 -139.3600       9.0         1       303        93
IR     2025130    131400   -8.8700 -139.6700       9.3         8       290        95
IR     2025130    131400   -8.8400 -139.7300      10.3         8       316        95
IR     2025130    131400   -8.8700 -139.8000      11.3         9       341        93
IR     2025130    131400   -8.8400 -140.1100       9.5       355       356        92
IR     2025130    131400   -8.8400 -140.2200       8.6         4       345        92
IR     2025130    131400   -8.8400 -140.2500       8.4         5       349        90
IR     2025130    131400   -8.8000 -140.4000       7.7        16       329        94
IR     2025130    131400   -8.8000 -140.5800       8.8        29       289        92
IR     2025130    131400   -8.8500 -140.7500       8.8        35       242        99
IR     2025130    131400   -8.8000 -141.1500       8.9        36       248        84
IR     2025130    131400   -8.8400 -141.2600      10.7        40       284        89
IR     2025130    131400   -8.8700 -141.2900      12.1        48       286        89
IR     2025130    131400   -8.9800 -133.2900       4.7        89       215        89
IR     2025130    131400   -8.9400 -133.3900       5.5        86       231        97
IR     2025130    131400   -8.9800 -133.4600       5.4       103       241        98
IR     2025130    131400   -8.9200 -133.5700       5.7       102       226        98
IR     2025130    131400   -8.9600 -133.5900       5.8       104       245       100
IR     2025130    131400   -8.9100 -133.7600       5.7       113       216        97
IR     2025130    131400   -8.9200 -133.7800       5.7       116       216        90
IR     2025130    131400   -8.9000 -134.0700       6.5       159       390        84
IR     2025130    131400   -8.9400 -134.1800       6.6       161       389        77
IR     2025130    131400   -8.9600 -134.3100       5.8       166       384        93
IR     2025130    131400   -8.9800 -134.3300       5.7       155       374        85
IR     2025130    131400   -8.9400 -134.5900       4.7       168       322        75
IR     2025130    131400   -8.9800 -134.6600       5.0       173       316        93
IR     2025130    131400   -8.9200 -134.7000       5.4       179       359       100
IR     2025130    131400   -8.9000 -134.8400       6.2       184       366        90
IR     2025130    131400   -8.9400 -134.9300       6.8       190       365        98
IR     2025130    131400   -8.9000 -134.9700       7.0       193       375       100
IR     2025130    131400   -8.9400 -135.1400       7.0       187       357        99
IR     2025130    131400   -8.9000 -135.1900       5.9       181       374        98
IR     2025130    131400   -8.9600 -135.3200       4.0       144       328        99
IR     2025130    131400   -8.9000 -135.4300       4.2       155       355        94
IR     2025130    131400   -8.9500 -135.9800      11.6        83       185       100
IR     2025130    131400   -8.9000 -136.0400      10.8        92       184       100
IR     2025130    131400   -8.9200 -136.1800      11.4       106       172        99
IR     2025130    131400   -8.9000 -136.2900      13.1       103       160        97
IR     2025130    131400   -8.9500 -136.3600      15.4       102       150        99
IR     2025130    131400   -8.9700 -136.4700      15.9       110       139        96
IR     2025130    131400   -8.9100 -136.5500      14.4       106       141        98
IR     2025130    131400   -8.9300 -136.6200      14.0       109       138        99
IR     2025130    131400   -8.9500 -136.6800      13.6       107       137        99
IR     2025130    131400   -8.9000 -136.7700       9.1       108       144        99
IR     2025130    131400   -8.9100 -136.8600       5.1       116       135        96
IR     2025130    131400   -8.9100 -137.1900       5.5       112       124        70
IR     2025130    131400   -8.8900 -137.2600       5.7       123       129        76
IR     2025130    131400   -8.8900 -137.3900       4.7       111       157        69
IR     2025130    131400   -8.8900 -137.4100       4.8       111       156        68
IR     2025130    131400   -8.9500 -137.5700       6.2       122       155        65
IR     2025130    131400   -8.9500 -137.6100       5.8       126       156        66
IR     2025130    131400   -8.8900 -138.0700       5.2       102       191        80
IR     2025130    131400   -8.9700 -138.1400       7.2        77       137        94
IR     2025130    131400   -8.9500 -138.3000      10.8        36       103        88
IR     2025130    131400   -8.9700 -138.3800      11.8        14       103        85
IR     2025130    131400   -8.8900 -138.4900       8.8       355       103        89
IR     2025130    131400   -8.9700 -138.5000      12.6       354       103        95
IR     2025130    131400   -8.9100 -138.6500       9.4       345       107        76
IR     2025130    131400   -8.8900 -138.7600       6.1       339       123        64
IR     2025130    131400   -8.8900 -138.8500       5.2       330       135        75
IR     2025130    131400   -8.9500 -138.9200       5.6       330       159        62
IR     2025130    131400   -8.8900 -139.2300       4.0        19       257        75
IR     2025130    131400   -8.9700 -139.3600       5.1        26       741        96
IR     2025130    131400   -8.9700 -139.4900       5.4        36       216        65
IR     2025130    131400   -8.8900 -139.5600       6.4        12       285       100
IR     2025130    131400   -8.9100 -139.6500       8.7        10       285        98
IR     2025130    131400   -8.9100 -139.6900       9.6         7       288        92
IR     2025130    131400   -8.8900 -139.7800      10.9         9       323        93
IR     2025130    131400   -8.8900 -139.9100      10.2         1       353        97
IR     2025130    131400   -8.9700 -140.1300       8.5         2       338        97
IR     2025130    131400   -8.9500 -140.2700       8.9        17       332        91
IR     2025130    131400   -8.8900 -140.3800       7.5        13       338        97
IR     2025130    131400   -8.9300 -140.4200       6.6        11       326        95
IR     2025130    131400   -8.9100 -140.5300       7.6        24       299        98
IR     2025130    131400   -8.8900 -140.6000       8.8        26       279        98
IR     2025130    131400   -8.9500 -140.6700       9.1        29       275       100
IR     2025130    131400   -8.9100 -141.0900       9.5        43       267        69
IR     2025130    131400   -8.9300 -141.2600      12.6        43       281        77
IR     2025130    131400   -8.9100 -141.3100      13.0        51       276        87
IR     2025130    131400   -9.0000 -133.3100       4.7        93       218        90
IR     2025130    131400   -9.0700 -133.3700       4.5       103       241        94
IR     2025130    131400   -9.0000 -133.5000       5.7       103       249        98
IR     2025130    131400   -9.0000 -133.5200       5.9       102       250        99
IR     2025130    131400   -9.0000 -133.7900       4.3       158       735        80
IR     2025130    131400   -9.0500 -133.9400       6.9        95       386        88
IR     2025130    131400   -9.0000 -134.0300       4.3       163       740        95
IR     2025130    131400   -9.0300 -134.1200       5.7       156       749        96
IR     2025130    131400   -9.0300 -134.1600       5.7       157       748        94
IR     2025130    131400   -9.0000 -134.3100       5.8       154       362        88
IR     2025130    131400   -9.0000 -134.3800       5.5       136       344        61
IR     2025130    131400   -9.0700 -134.4500       5.6       104       314        68
IR     2025130    131400   -9.0100 -134.6600       4.3       172       311        89
IR     2025130    131400   -8.9900 -134.7500       4.2       174       355        96
IR     2025130    131400   -8.9900 -134.8800       6.2       182       357        99
IR     2025130    131400   -9.0700 -134.9300       6.8       186       247        96
IR     2025130    131400   -9.0300 -135.0200       9.1       190       241        84
IR     2025130    131400   -9.0300 -135.1500       6.6       183       296        97
IR     2025130    131400   -9.0700 -135.1700       5.6       178       307        91
IR     2025130    131400   -9.0500 -135.2600       4.2       136       311        99
IR     2025130    131400   -9.0600 -135.7800      11.1        84       193       100
IR     2025130    131400   -9.0600 -135.8000      11.6        83       189       100
IR     2025130    131400   -9.0300 -135.9400      14.3        83       183       100
IR     2025130    131400   -8.9900 -135.9800      13.1        83       183       100
IR     2025130    131400   -9.0500 -136.1300      16.1        98       171        99
IR     2025130    131400   -9.0600 -136.1600      16.6        99       167        98
IR     2025130    131400   -9.0300 -136.3300      17.0       103       152        99
IR     2025130    131400   -9.0600 -136.4200      17.9       107       145        98
IR     2025130    131400   -9.0600 -136.4400      17.8       108       144        99
IR     2025130    131400   -9.0400 -136.6000      14.9       111       133       100
IR     2025130    131400   -9.0300 -136.6200      14.8       111       133       100
IR     2025130    131400   -9.0600 -136.7300      13.2        97       130       100
IR     2025130    131400   -8.9900 -136.8000       9.0        98       134        98
IR     2025130    131400   -9.0400 -136.9100       7.9        81       126        88
IR     2025130    131400   -9.0400 -137.1500       9.2        89       116        94
IR     2025130    131400   -9.0200 -137.1700       8.6        91       116        92
IR     2025130    131400   -9.0400 -137.3300       8.2        97       116        69
IR     2025130    131400   -9.0100 -137.4100       7.8       108       123        70
IR     2025130    131400   -8.9900 -137.5300       6.5       122       144        60
IR     2025130    131400   -8.9900 -138.0800       4.9        84       165        91
IR     2025130    131400   -9.0600 -138.1700      13.0         3       122        94
IR     2025130    131400   -8.9900 -138.3400      12.1        15       103        90
IR     2025130    131400   -8.9900 -138.3600      11.9        14       103        91
IR     2025130    131400   -8.9900 -138.5200      13.6       353       103        91
IR     2025130    131400   -9.0600 -138.5600      18.5       356       103        93
IR     2025130    131400   -9.0600 -138.6300      19.4       356       103        86
IR     2025130    131400   -9.0600 -138.7900       8.7       340       123        64
IR     2025130    131400   -8.9800 -138.8100       8.4       337       126        73
IR     2025130    131400   -8.9800 -139.3400       5.1        29       735        98
IR     2025130    131400   -8.9800 -139.5100       6.0        31       217        74
IR     2025130    131400   -8.9800 -139.6000       7.2        18       228       100
IR     2025130    131400   -9.0400 -139.7800       9.5         2       287       100
IR     2025130    131400   -9.0600 -139.9400       9.7       354       342        95
IR     2025130    131400   -9.0600 -139.9600       9.7       353       343        93
IR     2025130    131400   -9.0000 -140.1100       8.5         4       339        95
IR     2025130    131400   -9.0400 -140.2000       8.9        19       327       100
IR     2025130    131400   -9.0400 -140.2900       8.9        18       330        97
IR     2025130    131400   -9.0200 -140.3300       8.6        17       330        98
IR     2025130    131400   -9.0000 -140.4700       5.8         4       316        86
IR     2025130    131400   -8.9800 -140.5500       6.1        21       289        95
IR     2025130    131400   -9.0200 -140.7600      10.0        31       286        97
IR     2025130    131400   -8.9800 -140.9300       8.0        53       274        73
IR     2025130    131400   -9.0200 -141.1300      10.2        34       281        79
IR     2025130    131400   -9.1700 -133.0700       5.1        85       200        90
IR     2025130    131400   -9.1500 -133.1400       4.4        85       202        87
IR     2025130    131400   -9.1700 -133.3100       4.1       119       232        97
IR     2025130    131400   -9.0900 -133.3500       4.3       106       238        94
IR     2025130    131400   -9.0900 -133.4200       4.5       116       249        97
IR     2025130    131400   -9.1300 -133.7700       5.2       104       350        85
IR     2025130    131400   -9.1600 -133.8600       6.3        93       364        86
IR     2025130    131400   -9.1400 -133.9000       6.8        92       372        92
IR     2025130    131400   -9.1600 -133.9700       7.2        91       370        96
IR     2025130    131400   -9.1600 -134.0700       7.2        86       368        90
IR     2025130    131400   -9.1600 -134.2300       7.9        71       346        70
IR     2025130    131400   -9.0900 -134.2900       6.4       103       349        81
IR     2025130    131400   -9.1400 -134.4000       9.5        77       316        93
IR     2025130    131400   -9.1600 -134.4300       8.3        82       310        90
IR     2025130    131400   -9.1100 -134.6000       4.0       147       311        81
IR     2025130    131400   -9.1400 -134.6700       4.1       156       309        90
IR     2025130    131400   -9.1600 -134.7100       4.1       149       310        93
IR     2025130    131400   -9.1000 -134.8800       5.6       179       364        99
IR     2025130    131400   -9.0900 -134.9300       6.5       185       267        97
IR     2025130    131400   -9.1000 -134.9900       7.7       189       307        96
IR     2025130    131400   -9.0800 -135.1500       5.7       179       307        87
IR     2025130    131400   -9.0800 -135.1700       5.4       176       307        86
IR     2025130    131400   -9.1000 -135.7600      11.4        88       191       100
IR     2025130    131400   -9.0800 -135.7800      11.5        85       190       100
IR     2025130    131400   -9.0800 -135.8700      13.9        84       184       100
IR     2025130    131400   -9.1200 -135.9600      17.2        86       177       100
IR     2025130    131400   -9.1600 -136.1200      19.2        91       167        97
IR     2025130    131400   -9.1600 -136.1400      19.0        92       166        98
IR     2025130    131400   -9.1200 -136.2300      17.5        98       155        98
IR     2025130    131400   -9.1600 -136.3600      18.8       100       149        99
IR     2025130    131400   -9.1200 -136.4700      17.2       108       140        99
IR     2025130    131400   -9.0800 -136.5500      15.4       110       134       100
IR     2025130    131400   -9.1200 -136.6000      13.6       105       131       100
IR     2025130    131400   -9.0800 -136.7100      13.3        97       129       100
IR     2025130    131400   -9.0800 -136.8600      10.5        84       125        95
IR     2025130    131400   -9.1200 -137.0600      10.3        80       115        98
IR     2025130    131400   -9.1200 -137.1700      11.7        81       113        97
IR     2025130    131400   -9.1200 -137.3000      11.2        80       110        88
IR     2025130    131400   -9.1300 -137.4100       9.4        76       103        84
IR     2025130    131400   -9.0800 -137.5000       6.5        93       105        66
IR     2025130    131400   -9.1500 -137.5300       6.5        36       103        88
IR     2025130    131400   -9.1000 -138.1400       6.6        25       166        97
IR     2025130    131400   -9.1300 -138.1700      11.8       359       164        97
IR     2025130    131400   -9.1000 -138.3200      15.5         4       103        98
IR     2025130    131400   -9.1300 -138.3900      16.4         1       103        99
IR     2025130    131400   -9.0800 -138.4500      17.4       358       103        97
IR     2025130    131400   -9.1100 -138.5600      18.7         1       103        91
IR     2025130    131400   -9.1100 -138.6800      14.1         1       104        91
IR     2025130    131400   -9.1100 -138.7000      12.3         1       108        85
IR     2025130    131400   -9.0800 -139.0100       5.3       326       163        63
IR     2025130    131400   -9.1500 -139.0700       4.8       335       164        73
IR     2025130    131400   -9.1300 -139.3200       4.0        16       242        97
IR     2025130    131400   -9.1300 -139.5800       6.7        27       220        96
IR     2025130    131400   -9.1100 -139.6100       7.2        20       222        99
IR     2025130    131400   -9.1500 -139.6900       7.8         6       249       100
IR     2025130    131400   -9.1500 -139.8000       9.2       357       320        96
IR     2025130    131400   -9.1300 -139.8700      10.0       356       336        93
IR     2025130    131400   -9.1300 -140.0300       9.8         1       344        98
IR     2025130    131400   -9.0900 -140.0500       9.4       360       345        96
IR     2025130    131400   -9.1100 -140.2000       9.6        15       338       100
IR     2025130    131400   -9.0800 -140.3100       9.4        18       330        99
IR     2025130    131400   -9.0800 -140.3300       9.3        16       332       100
IR     2025130    131400   -9.1300 -140.4500       8.4         9       331        98
IR     2025130    131400   -9.0800 -140.5300       7.3        12       315        96
IR     2025130    131400   -9.2200 -132.9200       4.1        68       190        85
IR     2025130    131400   -9.2200 -133.0300       5.7        82       202        90
IR     2025130    131400   -9.1900 -133.0500       5.4        84       200        91
IR     2025130    131400   -9.2000 -133.3400       4.3       131       242        87
IR     2025130    131400   -9.1800 -133.4000       4.3       134       252        87
IR     2025130    131400   -9.2600 -133.7300       4.9        97       311        79
IR     2025130    131400   -9.1800 -133.8400       6.1        93       360        84
IR     2025130    131400   -9.1800 -133.9400       7.0        90       369        94
IR     2025130    131400   -9.2400 -133.9500       6.9        89       364        97
IR     2025130    131400   -9.1800 -134.0500       7.2        85       367        89
IR     2025130    131400   -9.2400 -134.1600       5.5        84       354        65
IR     2025130    131400   -9.2500 -134.3000      10.5        71       311        97
IR     2025130    131400   -9.2500 -134.3200      10.8        72       310        97
IR     2025130    131400   -9.2500 -134.4300       8.9        79       307        97
IR     2025130    131400   -9.1800 -134.7300       4.2       148       318        92
IR     2025130    131400   -9.2500 -134.8000       4.8       146       345        99
IR     2025130    131400   -9.2300 -134.8600       4.6       156       348        98
IR     2025130    131400   -9.2300 -134.9700       4.1       182       321        95
IR     2025130    131400   -9.2300 -135.3000       4.1       111       279        99
IR     2025130    131400   -9.2500 -135.4600       5.4        77       253        84
IR     2025130    131400   -9.1800 -135.5500       4.6        87       266        91
IR     2025130    131400   -9.1800 -135.6500       9.2        90       238        99
IR     2025130    131400   -9.1800 -135.6600      10.0        91       228        99
IR     2025130    131400   -9.1900 -135.7600      13.7        92       189        99
IR     2025130    131400   -9.2500 -135.8500      16.4        87       182        99
IR     2025130    131400   -9.1900 -135.9900      19.1        84       171       100
IR     2025130    131400   -9.1900 -136.0900      19.8        89       168        97
IR     2025130    131400   -9.2500 -136.1800      19.6        90       161        97
IR     2025130    131400   -9.2300 -136.2100      19.1        92       158        97
IR     2025130    131400   -9.2300 -136.3600      18.3        94       149        99
IR     2025130    131400   -9.1900 -136.4300      18.0       100       146        99
IR     2025130    131400   -9.2100 -136.5100      15.5        96       140       100
IR     2025130    131400   -9.2300 -136.6500      11.5        79       126       100
IR     2025130    131400   -9.1900 -136.7500      12.6        76       122       100
IR     2025130    131400   -9.1700 -136.7600      12.6        78       123       100
IR     2025130    131400   -9.1900 -137.2800      13.3        69       107        93
IR     2025130    131400   -9.1700 -137.3000      12.7        70       105        93
IR     2025130    131400   -9.2500 -137.3900       8.2        44       103        89
IR     2025130    131400   -9.1900 -137.5500       6.5        21       108        86
IR     2025130    131400   -9.2100 -137.6200       6.9       349       120        73
IR     2025130    131400   -9.1700 -137.6800       7.1       349       126        67
IR     2025130    131400   -9.2100 -138.0100       4.6       312       155        64
IR     2025130    131400   -9.2300 -138.0300       5.5       314       154        68
IR     2025130    131400   -9.1700 -138.1900      12.0       359       166        96
IR     2025130    131400   -9.2300 -138.2500      12.5         5       109        81
IR     2025130    131400   -9.1700 -138.3700      16.5         0       103        99
IR     2025130    131400   -9.2400 -138.4300      16.9         4       103        96
IR     2025130    131400   -9.1700 -138.5600      18.6         5       103        94
IR     2025130    131400   -9.1900 -138.5900      17.4         7       103        99
IR     2025130    131400   -9.2200 -138.7400      10.3       346       108        75
IR     2025130    131400   -9.2400 -138.7900       9.8       332       116        67
IR     2025130    131400   -9.2100 -138.9200       6.6       317       132        61
IR     2025130    131400   -9.1700 -139.0100       5.8       321       156        62
IR     2025130    131400   -9.2200 -139.0900       4.5       331       165        81
IR     2025130    131400   -9.2400 -139.1800       4.1       351       175        79
IR     2025130    131400   -9.2100 -139.2500       4.0         1       187        92
IR     2025130    131400   -9.1700 -139.5200       6.7        39       221        77
IR     2025130    131400   -9.2200 -139.6300       7.3        13       238        97
IR     2025130    131400   -9.2200 -139.6500       7.7         8       249        99
IR     2025130    131400   -9.1700 -139.7800       9.1       357       311        97
IR     2025130    131400   -9.1900 -139.9100      10.1       355       342        95
IR     2025130    131400   -9.2100 -139.9200      10.2       354       344        95
IR     2025130    131400   -9.2400 -140.0500       9.3         1       353       100
IR     2025130    131400   -9.2200 -140.1100       9.4         3       350       100
IR     2025130    131400   -9.2400 -140.2700      10.4       357       368       100
IR     2025130    131400   -9.2100 -140.3100      10.4         0       361       100
IR     2025130    131400   -9.1700 -140.4500       8.8         8       344        99
IR     2025130    131400   -9.1700 -140.4700       8.7         7       331        99
IR     2025130    131400   -9.2400 -140.5600       9.3         3       371        99
IR     2025130    131400   -9.1700 -140.8900      10.6        20       303        81
IR     2025130    131400   -9.1900 -141.2900      11.5        32       207        95
IR     2025130    131400   -9.2100 -141.3300      12.2        33       204        98
IR     2025130    131400   -9.2800 -133.0300       5.9        78       204        91
IR     2025130    131400   -9.3000 -133.0800       5.7        79       213        91
IR     2025130    131400   -9.3500 -133.1700       5.0        94       217        89
IR     2025130    131400   -9.3500 -133.2300       4.7       100       219        83
IR     2025130    131400   -9.2800 -133.3200       4.2       124       240        88
IR     2025130    131400   -9.2900 -133.7900       5.4        95       339        84
IR     2025130    131400   -9.3300 -133.8800       5.8        94       356        92
IR     2025130    131400   -9.3500 -134.0100       4.8        98       363        83
IR     2025130    131400   -9.3500 -134.0400       4.6       100       360        80
IR     2025130    131400   -9.3300 -134.1500       5.3        92       350        74
IR     2025130    131400   -9.2900 -134.3000      11.0        70       307        98
IR     2025130    131400   -9.2700 -134.3200      11.1        72       308        97
IR     2025130    131400   -9.2900 -134.4300       9.1        79       306        94
IR     2025130    131400   -9.2700 -134.5800       6.1       149       315        91
IR     2025130    131400   -9.2900 -134.6200       6.4       157       318        88
IR     2025130    131400   -9.3300 -134.7600       6.1       152       340       100
IR     2025130    131400   -9.2900 -134.7800       5.4       147       342       100
IR     2025130    131400   -9.2900 -134.8700       4.6       152       343       100
IR     2025130    131400   -9.3400 -135.2000       4.5       114       280        89
IR     2025130    131400   -9.2900 -135.3900       5.4        81       248        89
IR     2025130    131400   -9.3100 -135.4200       5.9        75       242        91
IR     2025130    131400   -9.2900 -135.5900      11.0        70       201        91
IR     2025130    131400   -9.2700 -135.6100      11.5        73       200        95
IR     2025130    131400   -9.2700 -135.7400      15.8        83       190        97
IR     2025130    131400   -9.3000 -135.8600      17.6        83       178        99
IR     2025130    131400   -9.3400 -135.8800      18.1        81       173       100
IR     2025130    131400   -9.2700 -136.0500      20.5        83       165        98
IR     2025130    131400   -9.2700 -136.1400      20.2        87       162        98
IR     2025130    131400   -9.2700 -136.1800      19.4        88       160        98
IR     2025130    131400   -9.3400 -136.3000      17.8        83       149       100
IR     2025130    131400   -9.3400 -136.3400      17.4        81       147       100
IR     2025130    131400   -9.2700 -136.4300      17.4        90       145        99
IR     2025130    131400   -9.3400 -136.5200      14.2        74       134        99
IR     2025130    131400   -9.2700 -136.6500      11.0        71       125        99
IR     2025130    131400   -9.2800 -136.7400      11.3        62       121        97
IR     2025130    131400   -9.2800 -136.8000      12.1        64       119        98
IR     2025130    131400   -9.3200 -136.9500      13.2        63       115        98
IR     2025130    131400   -9.2600 -137.0200      13.8        63       114        98
IR     2025130    131400   -9.2600 -137.2400      13.3        64       107        94
IR     2025130    131400   -9.3000 -137.3700       7.5        48       103        77
IR     2025130    131400   -9.3000 -137.5000       4.0        16       103        96
IR     2025130    131400   -9.2600 -137.6100       5.1       340       114        85
IR     2025130    131400   -9.2800 -137.8600       4.1       276       126        88
IR     2025130    131400   -9.2600 -138.0400       6.2       309       151        77
IR     2025130    131400   -9.2600 -138.2400      11.9         2       147        80
IR     2025130    131400   -9.3400 -138.3200      12.3       358       113        93
IR     2025130    131400   -9.2600 -138.4500      17.0         5       103        97
IR     2025130    131400   -9.2800 -138.5400      17.6         6       103        97
IR     2025130    131400   -9.3200 -138.6100      15.4       360       103        98
IR     2025130    131400   -9.3400 -138.7200      13.2       343       112        92
IR     2025130    131400   -9.2800 -138.7900      10.7       331       117        74
IR     2025130    131400   -9.3400 -138.9200       9.7       323       152        92
IR     2025130    131400   -9.3000 -138.9800       7.9       322       154        86
IR     2025130    131400   -9.3200 -139.1200       6.0       338       169        88
IR     2025130    131400   -9.3200 -139.1400       5.8       342       171        91
IR     2025130    131400   -9.3200 -139.2900       4.3       347       187        97
IR     2025130    131400   -9.3000 -139.5800       5.5        21       231        86
IR     2025130    131400   -9.2600 -139.6300       7.2        10       244        97
IR     2025130    131400   -9.3000 -139.7200       7.8       359       280        99
IR     2025130    131400   -9.3000 -139.7800       8.6         0       310        97
IR     2025130    131400   -9.2600 -139.9400       9.5       357       350        93
IR     2025130    131400   -9.2600 -139.9600       9.6       358       352        93
IR     2025130    131400   -9.2600 -140.0700       9.3         2       355       100
IR     2025130    131400   -9.3300 -140.1800      10.7       357       358       100
IR     2025130    131400   -9.2800 -140.2900      11.1       356       379       100
IR     2025130    131400   -9.2800 -140.3600      10.6       358       379        99
IR     2025130    131400   -9.3300 -140.4900       9.4         1       366       100
IR     2025130    131400   -9.3200 -140.5100       9.5         3       372        99
IR     2025130    131400   -9.3000 -140.6400       9.9         0       431        99
IR     2025130    131400   -9.3000 -141.3300      13.2        39       193        99
IR     2025130    131400   -9.4100 -132.9300       4.7        69       194        71
IR     2025130    131400   -9.4100 -133.0200       5.1        83       208        85
IR     2025130    131400   -9.4300 -133.1200       5.2        92       211        90
IR     2025130    131400   -9.4100 -133.1400       5.3        96       213        91
IR     2025130    131400   -9.3700 -133.2300       4.7       100       218        82
IR     2025130    131400   -9.3700 -133.8200       5.4        94       343        93
IR     2025130    131400   -9.3700 -133.8600       5.5        94       354        94
IR     2025130    131400   -9.4000 -134.0000       4.1       106       364        84
IR     2025130    131400   -9.3700 -134.0400       4.4       103       361        79
IR     2025130    131400   -9.4200 -134.1700       5.5       100       339        72
IR     2025130    131400   -9.4200 -134.2300       6.9        87       319        85
IR     2025130    131400   -9.3600 -134.3600       9.6        78       307        91
IR     2025130    131400   -9.3600 -134.5800       6.1       153       325        90
IR     2025130    131400   -9.3600 -134.7400       6.6       155       340       100
IR     2025130    131400   -9.4200 -134.7600       6.1       160       335        94
IR     2025130    131400   -9.4000 -134.8700       5.8       160       247        66
IR     2025130    131400   -9.3600 -135.2000       4.7       106       273        91
IR     2025130    131400   -9.4000 -135.3700       5.9        74       229        96
IR     2025130    131400   -9.3600 -135.3900       5.9        78       231        98
IR     2025130    131400   -9.4400 -135.4800       6.3        59       214        91
IR     2025130    131400   -9.4000 -135.6400      12.2        70       190        92
IR     2025130    131400   -9.4200 -135.7200      14.8        73       187        95
IR     2025130    131400   -9.3800 -135.8300      17.7        78       180        98
IR     2025130    131400   -9.3800 -135.8600      18.0        79       175        99
IR     2025130    131400   -9.3600 -135.9400      18.9        81       165       100
IR     2025130    131400   -9.4000 -136.1000      19.8        83       157        99
IR     2025130    131400   -9.4000 -136.1800      18.7        83       155        98
IR     2025130    131400   -9.3600 -136.2900      18.0        83       150       100
IR     2025130    131400   -9.3800 -136.3000      17.6        80       147       100
IR     2025130    131400   -9.4100 -136.4100      18.0        72       140       100
IR     2025130    131400   -9.4100 -136.4900      16.6        71       136       100
IR     2025130    131400   -9.4100 -136.5800      12.9        66       130        99
IR     2025130    131400   -9.3800 -136.6700      10.3        63       123        99
IR     2025130    131400   -9.3800 -136.9500      13.8        59       114       100
IR     2025130    131400   -9.3900 -137.2400      12.2        62       107        92
IR     2025130    131400   -9.3900 -137.2900       9.9        57       103        87
IR     2025130    131400   -9.3600 -137.3800       7.2        58       103        82
IR     2025130    131400   -9.3700 -137.5100       4.1        83       103        79
IR     2025130    131400   -9.4300 -137.8400       4.5       294       114        97
IR     2025130    131400   -9.3600 -137.9500       4.0       273       126        92
IR     2025130    131400   -9.3700 -138.0600       6.1       303       136        77
IR     2025130    131400   -9.3500 -138.1700       8.2       336       152        73
IR     2025130    131400   -9.3700 -138.2100       9.5       339       147        85
IR     2025130    131400   -9.3500 -138.2800      10.5       353       141        82
IR     2025130    131400   -9.4100 -138.3700      13.0       348       117        99
IR     2025130    131400   -9.4100 -138.5400      15.8       354       110        98
IR     2025130    131400   -9.4300 -138.6300      14.7       346       125       100
IR     2025130    131400   -9.4100 -138.7200      13.1       338       133        99
IR     2025130    131400   -9.4300 -138.7700      12.3       335       154       100
IR     2025130    131400   -9.3900 -138.8500      11.3       326       153        98
IR     2025130    131400   -9.3900 -138.9600       9.7       324       161        96
IR     2025130    131400   -9.4300 -139.0500       9.5       326       171        96
IR     2025130    131400   -9.3900 -139.1800       6.4       337       176        97
IR     2025130    131400   -9.3900 -139.2300       5.7       339       180        99
IR     2025130    131400   -9.3700 -139.3200       4.6       352       187        99
IR     2025130    131400   -9.4300 -139.3800       5.2       360       189        99
IR     2025130    131400   -9.4100 -139.4700       4.8       358       196        99
IR     2025130    131400   -9.4100 -139.6300       5.6       359       235       100
IR     2025130    131400   -9.4300 -139.6500       5.8       359       235       100
IR     2025130    131400   -9.4300 -139.8000       7.7         4       305        97
IR     2025130    131400   -9.3900 -139.9100       7.8         6       331        97
IR     2025130    131400   -9.4100 -140.0900       7.2         0       726        74
IR     2025130    131400   -9.3500 -140.1600      10.6       357       356        98
IR     2025130    131400   -9.4100 -140.2200      10.8       359       370        97
IR     2025130    131400   -9.3500 -140.4700       9.1       358       339        99
IR     2025130    131400   -9.4300 -140.7500      11.2       352       450        90
IR     2025130    131400   -9.3500 -140.8700      10.8       347       438        96
IR     2025130    131400   -9.4100 -140.9100      12.8       351       448        96
IR     2025130    131400   -9.3500 -140.9800      11.0         4       213        75
IR     2025130    131400   -9.4300 -141.1500      14.1        40       189        98
IR     2025130    131400   -9.4300 -141.1800      14.1        42       188        99
IR     2025130    131400   -9.3700 -141.2700      13.4        44       188       100
IR     2025130    131400   -9.5400 -133.0200       4.4        87       204        91
IR     2025130    131400   -9.5400 -133.0600       4.8        87       204        87
IR     2025130    131400   -9.4600 -133.1300       5.0        98       208        95
IR     2025130    131400   -9.5200 -133.2400       4.5        96       194        85
IR     2025130    131400   -9.4600 -133.3200       4.0       102       221        88
IR     2025130    131400   -9.4600 -133.7600       5.6        97       324        91
IR     2025130    131400   -9.4600 -133.9300       4.2       106       382        93
IR     2025130    131400   -9.4600 -134.1100       4.5       111       351        70
IR     2025130    131400   -9.4600 -134.1300       4.9       110       346        73
IR     2025130    131400   -9.4800 -134.2800       8.5        89       309       100
IR     2025130    131400   -9.4800 -134.3200       8.4        91       310        99
IR     2025130    131400   -9.5100 -134.5700       4.3       131       339        99
IR     2025130    131400   -9.4600 -134.7400       6.1       158       339        96
IR     2025130    131400   -9.4600 -134.7600       5.8       162       335        95
IR     2025130    131400   -9.5300 -134.8900       4.2       176       324        99
IR     2025130    131400   -9.5300 -135.2200       6.5        91       231        95
IR     2025130    131400   -9.4700 -135.2900       4.7        89       228        97
IR     2025130    131400   -9.4500 -135.3800       6.4        67       223        96
IR     2025130    131400   -9.4500 -135.4800       6.3        58       211        93
IR     2025130    131400   -9.4700 -135.6000      11.5        65       190        71
IR     2025130    131400   -9.5300 -135.7300      14.8        68       184        75
IR     2025130    131400   -9.5300 -135.7500      15.2        72       183        80
IR     2025130    131400   -9.4900 -135.8600      18.3        78       171        97
IR     2025130    131400   -9.4500 -135.9700      19.7        84       158       100
IR     2025130    131400   -9.5300 -136.1000      19.1        83       151       100
IR     2025130    131400   -9.4900 -136.1600      18.7        81       148        99
IR     2025130    131400   -9.5300 -136.2500      17.9        79       138        99
IR     2025130    131400   -9.4700 -136.3400      17.8        73       138        99
IR     2025130    131400   -9.5100 -136.4700      17.6        69       134       100
IR     2025130    131400   -9.5200 -136.4800      17.1        69       133       100
IR     2025130    131400   -9.5100 -136.6100      12.9        68       128       100
IR     2025130    131400   -9.4700 -136.7200      10.4        70       120       100
IR     2025130    131400   -9.4900 -136.8200      11.2        61       113        99
IR     2025130    131400   -9.4500 -137.2400      12.5        55       105        93
IR     2025130    131400   -9.5200 -137.3100      13.3        52       103       100
IR     2025130    131400   -9.5200 -137.3600      12.5        61       103        95
IR     2025130    131400   -9.5200 -137.4700      12.1        70       103        94
IR     2025130    131400   -9.5200 -137.6200       5.9        72       103        83
IR     2025130    131400   -9.4500 -137.8400       5.0       299       111        97
IR     2025130    131400   -9.5200 -137.9300       7.9       321       112        85
IR     2025130    131400   -9.4800 -138.0200       8.2       300       122        80
IR     2025130    131400   -9.5200 -138.1700      10.5       317       136        88
IR     2025130    131400   -9.4500 -138.2600      10.9       331       141        99
IR     2025130    131400   -9.4700 -138.3500      12.0       339       134        99
IR     2025130    131400   -9.4700 -138.3700      12.1       341       127        99
IR     2025130    131400   -9.4500 -138.4600      13.8       351       119        99
IR     2025130    131400   -9.5000 -139.1200      10.1       344       176       100
IR     2025130    131400   -9.5200 -139.2100       8.0       350       184       100
IR     2025130    131400   -9.5200 -139.2300       7.8       352       185       100
IR     2025130    131400   -9.5000 -139.3400       5.9         3       191        99
IR     2025130    131400   -9.5000 -139.4300       6.8       356       196        98
IR     2025130    131400   -9.5200 -139.5800       5.2       358       219        94
IR     2025130    131400   -9.5200 -139.6500       5.3         0       234        98
IR     2025130    131400   -9.5000 -139.8700       6.9         7       313        97
IR     2025130    131400   -9.5000 -139.9800       6.8        10       336        97
IR     2025130    131400   -9.4600 -140.1100       6.9       353       734        75
IR     2025130    131400   -9.4600 -140.1200       7.7       346       728        64
IR     2025130    131400   -9.4500 -140.2900       9.7       353       388       100
IR     2025130    131400   -9.4600 -140.6400       9.9       356       439        99
IR     2025130    131400   -9.5200 -140.8000      12.9       350       466        86
IR     2025130    131400   -9.5200 -140.8900      14.1       354       480        82
IR     2025130    131400   -9.4500 -140.9300      13.1       357       274        87
IR     2025130    131400   -9.4500 -141.1700      14.7        41       188       100
IR     2025130    131400   -9.4500 -141.1800      14.7        42       187       100
IR     2025130    131400   -9.4500 -141.2800      15.5        47       182       100
IR     2025130    131400   -9.5600 -133.0200       4.4        88       203        91
IR     2025130    131400   -9.5600 -133.0400       4.5        89       203        92
IR     2025130    131400   -9.5900 -133.1500       4.9        90       191        88
IR     2025130    131400   -9.6300 -133.3000       4.5        91       226        77
IR     2025130    131400   -9.5500 -133.7400       5.3        98       326        96
IR     2025130    131400   -9.6100 -133.8200       4.6       105       375        96
IR     2025130    131400   -9.5700 -133.8700       4.2       107       389        95
IR     2025130    131400   -9.6100 -134.0400       4.8        92       384        73
IR     2025130    131400   -9.6200 -134.2900      10.4        78       309        98
IR     2025130    131400   -9.6200 -134.3500       8.5        85       308       100
IR     2025130    131400   -9.5700 -134.4800       5.2       104       324       100
IR     2025130    131400   -9.5800 -135.0500       5.3        76       294        66
IR     2025130    131400   -9.5500 -135.2400       6.1        89       227        94
IR     2025130    131400   -9.5500 -135.3300       4.2        87       217        94
IR     2025130    131400   -9.5500 -135.4400       4.5        63       209        79
IR     2025130    131400   -9.5600 -135.5100       6.4        49       194        71
IR     2025130    131400   -9.6200 -135.6800      11.2        60       184        64
IR     2025130    131400   -9.5600 -135.7700      15.2        76       180        85
IR     2025130    131400   -9.5600 -135.7900      15.9        78       179        93
IR     2025130    131400   -9.5800 -135.8800      18.1        79       169        99
IR     2025130    131400   -9.5600 -136.0100      19.9        82       156       100
IR     2025130    131400   -9.6000 -136.1200      19.4        84       146       100
IR     2025130    131400   -9.5600 -136.1500      19.0        82       142       100
IR     2025130    131400   -9.5400 -136.2500      18.1        80       136       100
IR     2025130    131400   -9.5800 -136.4100      18.1        70       132       100
IR     2025130    131400   -9.5400 -136.5000      16.7        69       132       100
IR     2025130    131400   -9.5400 -136.5400      16.0        69       131       100
IR     2025130    131400   -9.6000 -136.6500      13.9        70       126        99
IR     2025130    131400   -9.6000 -136.7800      12.2        69       116        99
IR     2025130    131400   -9.6200 -136.8100      12.0        65       112        97
IR     2025130    131400   -9.5800 -136.8900      12.6        57       109        94
IR     2025130    131400   -9.5800 -137.2000      18.1        42       104       100
IR     2025130    131400   -9.5800 -137.2400      18.1        44       103       100
IR     2025130    131400   -9.5400 -137.4000      14.5        66       103        97
IR     2025130    131400   -9.5600 -137.4200      15.2        66       103        97
IR     2025130    131400   -9.6100 -137.5500      10.2        65       103        81
IR     2025130    131400   -9.5400 -137.6200       6.7        70       103        84
IR     2025130    131400   -9.5400 -137.7300       6.0        12       103        71
IR     2025130    131400   -9.5600 -137.8000      10.8         1       103        72
IR     2025130    131400   -9.5600 -137.9300      11.2       336       108        82
IR     2025130    131400   -9.6100 -137.9700      13.9       341       114        98
IR     2025130    131400   -9.6100 -138.1100      11.7       323       130        99
IR     2025130    131400   -9.5400 -138.1700      10.8       317       136        88
IR     2025130    131400   -9.5600 -138.3200      11.7       328       140        96
IR     2025130    131400   -9.5400 -138.4100      11.3       343       135        97
IR     2025130    131400   -9.6100 -138.5000      10.3       348       145        97
IR     2025130    131400   -9.5600 -138.5400      12.1       343       143        96
IR     2025130    131400   -9.5800 -138.6800      12.7       342       167        93
IR     2025130    131400   -9.5800 -139.0800      12.1       342       184        99
IR     2025130    131400   -9.5400 -139.1200      11.7       350       179        96
IR     2025130    131400   -9.5400 -139.2300       8.2       353       186       100
IR     2025130    131400   -9.6100 -139.3600       7.3         4       195       100
IR     2025130    131400   -9.6100 -139.4500       7.6       357       204        99
IR     2025130    131400   -9.6100 -139.4900       7.0       355       208       100
IR     2025130    131400   -9.5900 -139.6500       5.4         1       239        97
IR     2025130    131400   -9.5700 -139.8900       6.0         7       315        94
IR     2025130    131400   -9.5700 -139.9200       5.9         7       322        98
IR     2025130    131400   -9.5400 -140.1100       6.9       354       743        73
IR     2025130    131400   -9.6100 -140.3300      11.5       347       390        98
IR     2025130    131400   -9.5900 -140.4000      10.8       350       339        97
IR     2025130    131400   -9.5600 -140.5400       9.0         4       352       100
IR     2025130    131400   -9.5900 -140.5600       8.4         2       368        95
IR     2025130    131400   -9.5600 -140.8700      14.3       356       477        82
IR     2025130    131400   -9.5700 -141.1500      15.0        43       184        99
IR     2025130    131400   -9.6100 -141.1800      13.8        43       184        99
IR     2025130    131400   -9.5400 -141.2900      15.3        48       179        97
IR     2025130    131400   -9.6900 -132.9200       5.1        72       203        97
IR     2025130    131400   -9.6700 -132.9400       4.9        74       202        99
IR     2025130    131400   -9.6700 -133.0400       5.0        79       196        98
IR     2025130    131400   -9.7200 -133.2000       5.3        86       216        80
IR     2025130    131400   -9.7200 -133.2400       5.3        85       226        79
IR     2025130    131400   -9.6800 -133.7400       4.7        97       322        99
IR     2025130    131400   -9.7000 -133.7900       4.7        99       353       100
IR     2025130    131400   -9.7200 -133.9000       5.2       100       371        99
IR     2025130    131400   -9.7200 -134.0000       5.8        92       369        67
IR     2025130    131400   -9.6400 -134.2900      10.8        76       308        98
IR     2025130    131400   -9.6400 -134.3300       9.4        80       307        99
IR     2025130    131400   -9.7200 -134.4400       6.7        91       303        99
IR     2025130    131400   -9.7100 -135.1800      10.5        65       225        99
IR     2025130    131400   -9.6800 -135.2300       8.4        70       220        98
IR     2025130    131400   -9.6900 -135.3200       5.8        74       214        94
IR     2025130    131400   -9.6800 -135.4200       4.8        64       203        82
IR     2025130    131400   -9.7100 -135.5300       6.9        58       190        83
IR     2025130    131400   -9.6700 -135.6700      11.0        58       184        73
IR     2025130    131400   -9.6600 -135.7300      13.5        71       181        68
IR     2025130    131400   -9.7100 -135.8600      18.6        77       171        99
IR     2025130    131400   -9.6600 -135.9100      20.7        78       165        99
IR     2025130    131400   -9.7100 -135.9700      21.2        75       164        99
IR     2025130    131400   -9.6700 -136.1300      19.5        81       142       100
IR     2025130    131400   -9.6900 -136.1700      19.1        80       139        99
IR     2025130    131400   -9.7100 -136.3200      17.8        76       134       100
IR     2025130    131400   -9.7100 -136.4100      17.1        73       134       100
IR     2025130    131400   -9.7100 -136.4500      16.8        71       133       100
IR     2025130    131400   -9.6700 -136.5700      16.1        68       129       100
IR     2025130    131400   -9.6400 -136.6300      15.1        70       128       100
IR     2025130    131400   -9.7100 -136.7200      14.5        70       125       100
IR     2025130    131400   -9.6300 -136.8100      12.1        65       112        98
IR     2025130    131400   -9.6500 -136.9200      12.6        52       107        99
IR     2025130    131400   -9.7100 -137.2200      20.2        41       103       100
IR     2025130    131400   -9.7100 -137.2300      20.3        42       103       100
IR     2025130    131400   -9.6500 -137.3600      16.6        53       103        97
IR     2025130    131400   -9.6700 -137.4500      15.7        58       103        84
IR     2025130    131400   -9.6900 -137.5500      12.9        57       103        84
IR     2025130    131400   -9.6700 -137.6400       9.5        21       103        85
IR     2025130    131400   -9.6700 -137.6900      11.3       358       103        94
IR     2025130    131400   -9.6300 -137.8400      15.9       350       103        86
IR     2025130    131400   -9.7100 -137.9500      16.8       350       104        95
IR     2025130    131400   -9.6500 -137.9700      15.1       345       112        97
IR     2025130    131400   -9.6300 -138.1000      11.9       326       126       100
IR     2025130    131400   -9.6500 -138.2100      13.2       325       135        99
IR     2025130    131400   -9.7100 -138.2400      12.0       327       135        97
IR     2025130    131400   -9.6500 -138.3700      10.0       344       138        99
IR     2025130    131400   -9.6300 -138.4800       9.8       349       145        98
IR     2025130    131400   -9.6900 -138.5700      10.4       338       162        92
IR     2025130    131400   -9.6300 -138.6600      12.9       342       167        95
IR     2025130    131400   -9.7100 -138.7500      13.4       336       181        96
IR     2025130    131400   -9.6500 -138.7900      13.3       342       187        98
IR     2025130    131400   -9.7100 -138.9500      14.1       345       197        94
IR     2025130    131400   -9.6300 -139.1700       9.8       353       189        99
IR     2025130    131400   -9.7000 -139.2700       8.2        11       195        98
IR     2025130    131400   -9.6300 -139.3800       7.6         3       198       100
IR     2025130    131400   -9.6300 -139.4700       7.6       357       207       100
IR     2025130    131400   -9.7000 -139.5200       7.2       355       222        94
IR     2025130    131400   -9.7000 -139.6700       6.0         0       246       100
IR     2025130    131400   -9.7000 -140.0900       9.6       351       436        94
IR     2025130    131400   -9.7000 -140.2000      10.7       348       442        95
IR     2025130    131400   -9.7000 -140.2700      11.2       344       429        99
IR     2025130    131400   -9.6300 -140.3300      12.0       348       381        97
IR     2025130    131400   -9.7000 -140.4200      12.3       350       397        83
IR     2025130    131400   -9.7000 -140.5400       8.6       356       394        93
IR     2025130    131400   -9.6900 -140.6500       8.0       351       397        70
IR     2025130    131400   -9.6700 -140.6900       8.0       348       397        67
IR     2025130    131400   -9.6900 -140.9300      13.7        36       317       100
IR     2025130    131400   -9.6900 -141.1100      12.7        43       218       100
IR     2025130    131400   -9.7000 -141.1300      12.1        41       216       100
IR     2025130    131400   -9.7000 -141.2200      11.7        41       190        99
IR     2025130    131400   -9.7000 -141.3300      11.9        42       185        99
IR     2025130    131400   -9.7800 -132.8300       5.7        56       200        94
IR     2025130    131400   -9.8200 -132.8500       6.2        55       193        92
IR     2025130    131400   -9.7400 -132.9400       5.6        74       199        96
IR     2025130    131400   -9.8100 -133.1100       5.1        91       214        78
IR     2025130    131400   -9.7800 -133.1400       5.2        88       215        84
IR     2025130    131400   -9.7400 -133.2900       4.8        87       233        86
IR     2025130    131400   -9.7800 -133.3300       4.3        90       243        96
IR     2025130    131400   -9.7700 -133.7200       4.3        98       303       100
IR     2025130    131400   -9.7700 -133.7700       4.4        97       330       100
IR     2025130    131400   -9.7400 -133.8900       5.2       102       368        99
IR     2025130    131400   -9.8100 -134.0300       8.6        75       349        67
IR     2025130    131400   -9.7400 -134.0700       8.0        75       341        77
IR     2025130    131400   -9.7500 -134.4800       5.2        93       308        92
IR     2025130    131400   -9.7300 -135.1600      10.9        66       228       100
IR     2025130    131400   -9.7500 -135.2300      10.0        65       220        99
IR     2025130    131400   -9.7500 -135.3200       6.8        73       213        98
IR     2025130    131400   -9.8100 -135.4500       5.4        78       192        98
IR     2025130    131400   -9.7700 -135.5600       6.1        69       189        78
IR     2025130    131400   -9.7500 -135.6200       7.3        61       187        87
IR     2025130    131400   -9.7700 -135.7500      15.2        79       177        95
IR     2025130    131400   -9.7500 -135.8600      18.7        76       171        99
IR     2025130    131400   -9.7300 -135.9500      21.1        75       166        99
IR     2025130    131400   -9.7300 -135.9700      20.9        74       164        99
IR     2025130    131400   -9.8000 -136.1100      17.6        69       151       100
IR     2025130    131400   -9.7700 -136.2200      18.0        73       143        99
IR     2025130    131400   -9.7700 -136.3000      17.8        72       139       100
IR     2025130    131400   -9.7700 -136.3300      17.5        70       137       100
IR     2025130    131400   -9.7300 -136.4500      16.7        71       133       100
IR     2025130    131400   -9.7300 -136.5700      16.2        67       129       100
IR     2025130    131400   -9.7500 -136.6500      15.6        66       129        99
IR     2025130    131400   -9.7600 -136.7800      14.6        67       124       100
IR     2025130    131400   -9.7300 -136.8500      13.2        63       110        99
IR     2025130    131400   -9.7300 -136.9200      12.8        52       107       100
IR     2025130    131400   -9.7800 -137.2100      19.5        41       103       100
IR     2025130    131400   -9.7600 -137.2500      20.2        42       103       100
IR     2025130    131400   -9.8000 -137.3200      19.0        47       103        99
IR     2025130    131400   -9.8000 -137.4900      14.5        59       103        71
IR     2025130    131400   -9.7300 -137.5300      12.8        58       103        82
IR     2025130    131400   -9.7300 -137.6200      11.8        32       103        90
IR     2025130    131400   -9.7400 -137.7100      14.1         5       103       100
IR     2025130    131400   -9.8000 -137.7800      16.4         7       103        99
IR     2025130    131400   -9.7300 -137.9500      18.3       354       104        89
IR     2025130    131400   -9.7300 -137.9700      17.4       351       105        95
IR     2025130    131400   -9.7400 -138.0800      15.3       343       126        92
IR     2025130    131400   -9.7800 -138.1900      13.9       331       134        93
IR     2025130    131400   -9.8000 -138.3000      12.6       328       137        96
IR     2025130    131400   -9.7400 -138.4100      10.2       343       144        98
IR     2025130    131400   -9.7200 -138.4400       9.9       346       152        96
IR     2025130    131400   -9.7800 -138.5700      12.1       339       165       100
IR     2025130    131400   -9.7600 -138.6800      13.7       335       171        96
IR     2025130    131400   -9.7200 -138.7500      13.4       334       182        96
IR     2025130    131400   -9.7800 -138.8100      13.2       336       192        86
IR     2025130    131400   -9.8000 -138.9500      13.0       345       221        94
IR     2025130    131400   -9.8000 -139.1000      11.9       352       191       100
IR     2025130    131400   -9.8000 -139.2300       9.6         7       194       100
IR     2025130    131400   -9.7800 -139.2500       9.2         9       195       100
IR     2025130    131400   -9.8000 -139.4100       9.4         4       210       100
IR     2025130    131400   -9.7200 -139.4800       8.1       355       214        98
IR     2025130    131400   -9.7200 -139.5200       7.2       355       222        93
IR     2025130    131400   -9.8000 -139.6900       6.0       358       257        99
IR     2025130    131400   -9.8000 -140.0700       9.2       351       357        95
IR     2025130    131400   -9.7400 -140.1600      11.0       349       437        88
IR     2025130    131400   -9.7200 -140.2700      11.2       343       436       100
IR     2025130    131400   -9.7800 -140.4500      10.8       340       442        96
IR     2025130    131400   -9.8000 -140.4900      10.4       344       435        94
IR     2025130    131400   -9.7600 -140.6200       8.9       351       395        73
IR     2025130    131400   -9.7200 -140.6700       8.0       349       394        63
IR     2025130    131400   -9.8000 -140.8400      12.1        25       328        94
IR     2025130    131400   -9.8000 -141.0700      13.8        38       282       100
IR     2025130    131400   -9.7200 -141.1300      12.1        40       218       100
IR     2025130    131400   -9.8000 -141.2000      12.5        34       192       100
IR     2025130    131400   -9.8000 -141.3100      13.3        35       188        99
IR     2025130    131400   -9.9100 -132.7700       5.7        44       192        96
IR     2025130    131400   -9.8300 -132.8500       6.3        53       192        93
IR     2025130    131400   -9.9100 -133.0100       5.5        80       208        89
IR     2025130    131400   -9.8500 -133.0900       5.2        89       216        79
IR     2025130    131400   -9.8700 -133.1400       5.1        89       227        86
IR     2025130    131400   -9.8900 -133.2200       4.4        93       231        93
IR     2025130    131400   -9.8300 -133.8100       5.1       109       341        99
IR     2025130    131400   -9.9000 -133.8800       7.8       100       355        98
IR     2025130    131400   -9.8400 -135.0300       4.9        62       294        94
IR     2025130    131400   -9.8400 -135.1700      10.8        60       225        98
IR     2025130    131400   -9.8200 -135.2500      10.8        62       220        99
IR     2025130    131400   -9.8800 -135.3800       7.5        77       209        98
IR     2025130    131400   -9.9000 -135.3900       7.1        82       208        93
IR     2025130    131400   -9.9000 -135.5200       5.5       104       190        95
IR     2025130    131400   -9.8200 -135.6500       6.4        86       186        81
IR     2025130    131400   -9.8400 -135.7500      14.7        79       180        85
IR     2025130    131400   -9.8400 -135.8000      17.7        75       174        96
IR     2025130    131400   -9.8600 -135.9100      18.7        71       166        99
IR     2025130    131400   -9.8600 -135.9700      18.1        70       163       100
IR     2025130    131400   -9.8400 -136.0800      17.2        64       155       100
IR     2025130    131400   -9.8600 -136.1300      17.2        63       152       100
IR     2025130    131400   -9.8600 -136.2200      17.5        64       147        99
IR     2025130    131400   -9.8200 -136.3300      17.4        66       141        99
IR     2025130    131400   -9.8200 -136.4400      16.6        60       137       100
IR     2025130    131400   -9.8200 -136.5500      16.6        59       133        99
IR     2025130    131400   -9.8400 -136.6600      16.3        60       130       100
IR     2025130    131400   -9.8800 -136.7600      16.5        58       126       100
IR     2025130    131400   -9.8800 -136.8500      15.3        54       116       100
IR     2025130    131400   -9.8900 -136.8700      15.3        53       115       100
IR     2025130    131400   -9.8900 -137.0300      13.8        44       105        84
IR     2025130    131400   -9.8200 -137.1200      16.0        39       104        89
IR     2025130    131400   -9.8700 -137.2100      17.9        47       103       100
IR     2025130    131400   -9.8400 -137.2700      18.9        45       103       100
IR     2025130    131400   -9.8200 -137.3400      18.7        49       103        96
IR     2025130    131400   -9.8400 -137.4500      16.9        51       103        96
IR     2025130    131400   -9.8200 -137.5100      11.8        59       103        83
IR     2025130    131400   -9.8400 -137.6700      18.4        16       103        99
IR     2025130    131400   -9.8200 -137.7300      16.4         9       103        99
IR     2025130    131400   -9.8200 -137.8600      16.8         2       103        98
IR     2025130    131400   -9.8400 -137.8900      16.1         1       104        99
IR     2025130    131400   -9.8200 -137.9800      17.7         1       110        92
IR     2025130    131400   -9.8200 -138.0900      16.0       348       128        89
IR     2025130    131400   -9.8500 -138.1700      14.5       338       132        99
IR     2025130    131400   -9.8200 -138.3100      12.7       329       137        94
IR     2025130    131400   -9.8400 -138.4000      11.3       335       141        98
IR     2025130    131400   -9.8700 -138.4400      11.6       334       149        99
IR     2025130    131400   -9.8400 -138.5900      12.5       339       167        99
IR     2025130    131400   -9.8200 -138.6800      14.4       337       175        96
IR     2025130    131400   -9.8900 -138.7700      13.4       338       190        92
IR     2025130    131400   -9.8900 -138.8100      12.9       339       203        87
IR     2025130    131400   -9.8200 -138.9500      12.8       346       227        94
IR     2025130    131400   -9.8200 -138.9700      12.9       347       226        93
IR     2025130    131400   -9.8200 -139.1200      11.2       354       191       100
IR     2025130    131400   -9.8200 -139.2100       9.9         5       193       100
IR     2025130    131400   -9.8900 -139.3000       9.7         8       205       100
IR     2025130    131400   -9.8200 -139.3900       9.7         7       209       100
IR     2025130    131400   -9.8500 -139.4300      10.1         5       213       100
IR     2025130    131400   -9.8900 -139.5900       6.6       359       250        93
IR     2025130    131400   -9.8700 -139.6900       6.5       360       258        97
IR     2025130    131400   -9.8700 -140.0300       9.4       349       342        82
IR     2025130    131400   -9.8900 -140.1600      10.1       347       357        94
IR     2025130    131400   -9.8300 -140.2700      11.4       339       439        99
IR     2025130    131400   -9.8700 -140.3400      11.8       340       448       100
IR     2025130    131400   -9.8300 -140.4500      11.5       345       442        98
IR     2025130    131400   -9.8200 -140.4900      10.7       345       438        96
IR     2025130    131400   -9.8500 -140.6500       9.9       356       393        96
IR     2025130    131400   -9.8300 -140.6700       9.5       357       391        93
IR     2025130    131400   -9.8200 -140.8400      12.0        25       329        94
IR     2025130    131400   -9.8900 -140.9300      14.0        39       315        98
IR     2025130    131400   -9.8900 -141.0200      15.4        36       292       100
IR     2025130    131400   -9.8500 -141.0700      14.4        34       280       100
IR     2025130    131400   -9.8300 -141.1800      13.5        30       199       100
IR     2025130    131400   -9.8200 -141.2200      13.2        31       192        99
IR     2025130    131400   -9.8200 -141.3100      13.9        33       188        99
IR     2025130    131400  -10.0000 -132.8400       4.9        50       191       100
IR     2025130    131400   -9.9800 -133.0100       5.3        77       213        92
IR     2025130    131400   -9.9800 -133.0800       4.2        85       222        82
IR     2025130    131400   -9.9400 -133.7700       6.7       121       323        96
IR     2025130    131400   -9.9200 -133.8800       8.2        98       356        97
IR     2025130    131400   -9.9200 -134.6200       4.0       145       347        94
IR     2025130    131400   -9.9400 -134.7500       4.0       172       364        83
IR     2025130    131400   -9.9200 -134.7900       4.0       177       365        74
IR     2025130    131400   -9.9500 -135.2100       7.3        60       228        94
IR     2025130    131400   -9.9900 -135.2800       8.6        55       220        99
IR     2025130    131400   -9.9400 -135.3800       7.9        70       209        93
IR     2025130    131400   -9.9500 -135.4100       7.0        75       207        80
IR     2025130    131400   -9.9200 -135.5200       5.5       103       190        94
IR     2025130    131400   -9.9500 -135.6100       7.1        89       189        99
IR     2025130    131400   -9.9200 -135.7300      10.9        69       185        69
IR     2025130    131400   -9.9700 -135.7800      13.4        63       183        76
IR     2025130    131400   -9.9300 -135.9300      17.1        65       165       100
IR     2025130    131400   -9.9100 -135.9600      16.9        65       163       100
IR     2025130    131400   -9.9900 -136.0600      16.3        54       159       100
IR     2025130    131400   -9.9100 -136.1500      17.1        57       152        98
IR     2025130    131400   -9.9700 -136.2900      18.6        49       145       100
IR     2025130    131400   -9.9700 -136.3300      18.4        49       143       100
IR     2025130    131400   -9.9300 -136.4600      17.2        47       137       100
IR     2025130    131400   -9.9500 -136.5500      17.6        47       134        99
IR     2025130    131400   -9.9500 -136.6300      17.5        48       131        99
IR     2025130    131400   -9.9300 -136.7400      17.3        52       125       100
IR     2025130    131400   -9.9100 -136.8600      15.6        52       115       100
IR     2025130    131400   -9.9100 -136.8800      15.3        52       114       100
IR     2025130    131400   -9.9100 -137.0300      13.7        45       107        82
IR     2025130    131400   -9.9900 -137.0700      13.7        46       110        78
IR     2025130    131400   -9.9900 -137.2300      16.5        51       105        99
IR     2025130    131400   -9.9300 -137.2700      17.8        50       104       100
IR     2025130    131400   -9.9700 -137.4000      17.5        29       103        75
IR     2025130    131400   -9.9700 -137.4500      17.6        22       103        71
IR     2025130    131400   -9.9900 -137.5600      19.3        14       103        97
IR     2025130    131400   -9.9700 -137.6700      20.1        14       104        95
IR     2025130    131400   -9.9700 -137.7400      18.6         9       105        98
IR     2025130    131400   -9.9300 -137.8000      16.7         4       105        97
IR     2025130    131400   -9.9300 -137.9500      14.1         1       109        98
IR     2025130    131400   -9.9500 -138.0600      14.5       359       120        97
IR     2025130    131400   -9.9700 -138.1100      14.2       353       130        87
IR     2025130    131400   -9.9300 -138.2000      13.6       337       134        99
IR     2025130    131400   -9.9500 -138.2600      13.3       330       135        99
IR     2025130    131400   -9.9100 -138.4200      12.2       332       143       100
IR     2025130    131400   -9.9300 -138.5100      13.0       342       160       100
IR     2025130    131400   -9.9500 -138.5500      13.2       346       164        99
IR     2025130    131400   -9.9500 -138.6400      14.8       346       176       100
IR     2025130    131400   -9.9300 -138.7700      14.6       342       191        94
IR     2025130    131400   -9.9600 -138.8800      14.7       349       235        95
IR     2025130    131400   -9.9100 -138.9700      12.6       350       238        90
IR     2025130    131400   -9.9500 -139.0100      13.2       352       251        92
IR     2025130    131400   -9.9300 -139.2800       9.7         8       205       100
IR     2025130    131400   -9.9300 -139.3400       9.9         9       208        99
IR     2025130    131400   -9.9500 -139.4300      10.4         7       214        98
IR     2025130    131400   -9.9100 -139.5800       7.1       359       253        94
IR     2025130    131400   -9.9800 -139.6500       8.2         2       260        99
IR     2025130    131400   -9.9800 -139.9000       6.7       345       309        92
IR     2025130    131400   -9.9800 -140.0100       7.8       341       332        72
IR     2025130    131400   -9.9300 -140.1100       9.5       349       346        91
IR     2025130    131400   -9.9800 -140.2000       8.1       346       356        96
IR     2025130    131400   -9.9300 -140.3100      11.7       339       484       100
IR     2025130    131400   -9.9100 -140.3400      11.3       341       451       100
IR     2025130    131400   -9.9100 -140.4900      11.4       352       439        99
IR     2025130    131400   -9.9400 -140.5400      10.8       358       438        94
IR     2025130    131400   -9.9400 -140.6200      10.6       358       396        93
IR     2025130    131400   -9.9800 -140.7100      12.6        11       345        94
IR     2025130    131400   -9.9600 -140.8200      13.7        27       326        98
IR     2025130    131400   -9.9100 -140.9500      14.7        39       306        98
IR     2025130    131400   -9.9100 -141.0200      15.5        36       290       100
IR     2025130    131400   -9.9100 -141.0700      15.5        32       272       100
IR     2025130    131400   -9.9800 -141.1500      16.3        29       202        99
IR     2025130    131400   -9.9600 -141.2400      15.5        24       189        97
IR     2025130    131400   -9.9600 -141.3300      13.8        30       186        99
IR     2025130    131400  -10.0600 -132.8200       4.8        46       195       100
IR     2025130    131400  -10.0400 -132.8400       5.0        49       193       100
IR     2025130    131400  -10.0200 -132.9700       5.1        67       200        99
IR     2025130    131400  -10.0300 -133.7500       6.5       126       325        88
IR     2025130    131400  -10.0200 -133.7900       8.4       129       354        68
IR     2025130    131400  -10.0900 -133.8600       9.1       107       354        77
IR     2025130    131400  -10.0100 -134.7100       4.0       162       355        84
IR     2025130    131400  -10.0100 -135.2800       8.4        50       220        99
IR     2025130    131400  -10.0800 -135.3400       7.9        41       217        84
IR     2025130    131400  -10.0300 -135.4300       7.7        55       206        82
IR     2025130    131400  -10.0500 -135.5900       7.8        78       190        97
IR     2025130    131400  -10.0100 -135.6900       9.0        74       187        86
IR     2025130    131400  -10.0800 -135.7200      10.3        64       186        97
IR     2025130    131400  -10.0500 -135.8300      10.4        70       178        98
IR     2025130    131400  -10.0800 -135.9400      12.0        64       167       100
IR     2025130    131400  -10.0400 -136.0200      14.2        55       162        99
IR     2025130    131400  -10.0100 -136.0900      16.8        52       157       100
IR     2025130    131400  -10.0600 -136.2000      18.3        48       149       100
IR     2025130    131400  -10.0600 -136.2900      19.0        48       143       100
IR     2025130    131400  -10.0800 -136.4000      19.0        45       136       100
IR     2025130    131400  -10.0600 -136.4600      18.5        43       135       100
IR     2025130    131400  -10.0800 -136.5700      18.1        44       129       100
IR     2025130    131400  -10.0100 -136.6400      17.7        46       126        99
IR     2025130    131400  -10.0200 -136.7900      17.2        47       117        99
IR     2025130    131400  -10.0200 -136.8800      16.2        45       116       100
IR     2025130    131400  -10.0600 -136.9700      14.9        40       115        98
IR     2025130    131400  -10.0800 -137.0100      15.0        39       114        99
IR     2025130    131400  -10.0800 -137.1000      15.6        45       115        99
IR     2025130    131400  -10.0800 -137.2300      16.5        45       110       100
IR     2025130    131400  -10.0800 -137.3400      16.3        27       107       100
IR     2025130    131400  -10.0200 -137.4100      16.7        21       104        78
IR     2025130    131400  -10.0600 -137.5000      17.9         7       105        98
IR     2025130    131400  -10.0600 -137.5400      18.3         8       105        99
IR     2025130    131400  -10.0800 -137.7100      19.7         5       108        90
IR     2025130    131400  -10.0800 -137.7200      19.7         4       108        91
IR     2025130    131400  -10.0200 -137.8900      14.2       355       111        98
IR     2025130    131400  -10.0200 -137.9100      13.5       354       112        95
IR     2025130    131400  -10.0400 -138.0400      12.7       348       121        92
IR     2025130    131400  -10.0800 -138.1100      11.9       332       130        88
IR     2025130    131400  -10.0800 -138.2600      12.9       335       134        92
IR     2025130    131400  -10.0400 -138.3500      12.8       333       139        95
IR     2025130    131400  -10.0600 -138.3700      12.7       333       139        95
IR     2025130    131400  -10.0800 -138.5300      13.3       350       163       100
IR     2025130    131400  -10.0000 -138.5500      13.2       351       167       100
IR     2025130    131400  -10.0400 -138.6800      17.8       354       178        98
IR     2025130    131400  -10.0600 -138.7700      18.4       355       191        96
IR     2025130    131400  -10.0000 -139.0600      13.9       353       254        98
IR     2025130    131400  -10.0400 -139.1400      13.7       355       209        96
IR     2025130    131400  -10.0600 -139.2600      12.2         3       208        99
IR     2025130    131400  -10.0600 -139.2800      11.9         4       208        98
IR     2025130    131400  -10.0000 -139.3700      11.2         7       209        99
IR     2025130    131400  -10.0700 -139.5400      10.2       358       262        98
IR     2025130    131400  -10.0000 -139.6300       8.5         1       259        98
IR     2025130    131400  -10.0000 -139.6500       8.5         3       262        99
IR     2025130    131400  -10.0600 -139.9000       6.8       343       321        90
IR     2025130    131400  -10.0000 -140.0500       8.3       352       345        80
IR     2025130    131400  -10.0200 -140.1600       7.6       349       353        93
IR     2025130    131400  -10.0200 -140.1800       7.5       344       354        93
IR     2025130    131400  -10.0700 -140.3400       9.1       353       404       100
IR     2025130    131400  -10.0600 -140.3600      10.2       352       444       100
IR     2025130    131400  -10.0700 -140.4900      10.0         1       452        97
IR     2025130    131400  -10.0700 -140.6000       9.9         0       484        96
IR     2025130    131400  -10.0200 -140.7100      12.8        11       323        92
IR     2025130    131400  -10.0200 -140.7300      13.0        12       321        91
IR     2025130    131400  -10.0400 -140.8700      14.6        26       298        99
IR     2025130    131400  -10.0200 -140.9100      15.0        31       290        99
IR     2025130    131400  -10.0400 -141.0000      15.1        34       262       100
IR     2025130    131400  -10.0000 -141.1500      16.1        30       201       100
IR     2025130    131400  -10.0000 -141.2400      15.0        27       190        98
IR     2025130    131400  -10.0700 -141.3100      11.8        41       189        94
IR     2025130    131400  -10.1100 -132.8000       4.1        46       196        98
IR     2025130    131400  -10.1100 -133.7500       5.3       117       332        96
IR     2025130    131400  -10.1100 -133.7700       6.9       125       351        78
IR     2025130    131400  -10.1800 -133.9100       8.4        88       334        83
IR     2025130    131400  -10.1400 -135.2400       5.2        25       233        92
IR     2025130    131400  -10.1800 -135.3500       7.4        30       216        87
IR     2025130    131400  -10.1600 -135.5900       5.6        59       192        91
IR     2025130    131400  -10.1800 -135.6700       6.9        55       189        98
IR     2025130    131400  -10.1400 -135.7400      10.7        55       185        97
IR     2025130    131400  -10.1600 -135.7900      10.2        59       184        99
IR     2025130    131400  -10.1000 -135.9400      12.0        64       168        99
IR     2025130    131400  -10.1000 -136.0000      12.7        58       164        96
IR     2025130    131400  -10.1200 -136.1500      18.0        48       152       100
IR     2025130    131400  -10.1600 -136.2400      18.9        48       146       100
IR     2025130    131400  -10.1200 -136.2900      19.5        48       143       100
IR     2025130    131400  -10.1700 -136.4200      19.4        47       136       100
IR     2025130    131400  -10.1700 -136.4600      19.1        46       134       100
IR     2025130    131400  -10.1000 -136.5700      18.1        44       129       100
IR     2025130    131400  -10.1700 -136.7000      17.5        44       122        99
IR     2025130    131400  -10.1700 -136.7100      17.4        44       121        99
IR     2025130    131400  -10.1000 -136.8800      16.4        42       116        99
IR     2025130    131400  -10.1500 -136.9700      15.6        36       117        99
IR     2025130    131400  -10.1300 -137.0300      15.4        39       115        99
IR     2025130    131400  -10.1700 -137.1500      16.6        38       116       100
IR     2025130    131400  -10.1700 -137.1700      16.6        38       116       100
IR     2025130    131400  -10.1700 -137.3400      16.2        21       108       100
IR     2025130    131400  -10.1700 -137.3600      16.1        18       108        99
IR     2025130    131400  -10.1700 -137.4500      16.3        12       107        99
IR     2025130    131400  -10.1700 -137.6000      16.6         9       109        95
IR     2025130    131400  -10.1300 -137.6300      18.1         9       108        92
IR     2025130    131400  -10.1700 -137.7600      18.3         8       116        97
IR     2025130    131400  -10.1700 -137.8200      17.9         7       119       100
IR     2025130    131400  -10.1300 -137.9800      13.5       348       129        98
IR     2025130    131400  -10.1500 -138.0000      13.1       343       131        99
IR     2025130    131400  -10.1700 -138.1100      13.1       322       135        91
IR     2025130    131400  -10.1100 -138.2600      13.0       339       136        98
IR     2025130    131400  -10.1500 -138.2700      13.4       339       138        98
IR     2025130    131400  -10.1300 -138.4200      13.6       334       149        97
IR     2025130    131400  -10.1700 -138.4800      14.5       340       156        99
IR     2025130    131400  -10.0900 -138.5500      13.7       351       165       100
IR     2025130    131400  -10.1500 -138.7100      18.4       356       182        96
IR     2025130    131400  -10.1700 -138.8100      17.8       354       208        98
IR     2025130    131400  -10.0900 -139.2600      12.3         3       209        99
IR     2025130    131400  -10.0900 -139.2800      12.0         4       210        99
IR     2025130    131400  -10.1700 -139.3900      11.7         1       228        92
IR     2025130    131400  -10.0900 -139.5200      10.6       359       256        99
IR     2025130    131400  -10.0900 -139.5900       9.7       359       265        97
IR     2025130    131400  -10.0900 -139.8900       6.9       345       321        87
IR     2025130    131400  -10.0900 -139.9200       7.0       339       333        75
IR     2025130    131400  -10.1700 -140.0500       7.7       344       352        76
IR     2025130    131400  -10.1300 -140.0900       7.9       352       347        83
IR     2025130    131400  -10.1500 -140.2000       6.8       349       346        95
IR     2025130    131400  -10.1700 -140.3100       8.1       354       353       100
IR     2025130    131400  -10.1700 -140.3800       8.7         3       379       100
IR     2025130    131400  -10.1100 -140.4700      10.1         1       453        98
IR     2025130    131400  -10.1300 -140.6000      10.4       360       491        98
IR     2025130    131400  -10.1100 -140.8700      14.7        23       285        96
IR     2025130    131400  -10.1500 -140.8900      14.7        24       284        98
IR     2025130    131400  -10.0900 -141.0000      14.1        35       254        99
IR     2025130    131400  -10.1700 -141.1100      11.8        38       204       100
IR     2025130    131400  -10.0900 -141.1800      13.1        41       200       100
IR     2025130    131400  -10.1300 -141.3300      10.2        48       191        78
IR     2025130    131400  -10.2800 -133.2400       5.1        61       207        80
IR     2025130    131400  -10.2800 -133.2600       5.0        62       209        80
IR     2025130    131400  -10.2600 -133.8000       5.1       104       336        79
IR     2025130    131400  -10.2000 -133.8900       8.1        94       336        82
IR     2025130    131400  -10.2700 -134.5200       7.1        60       259       100
IR     2025130    131400  -10.2500 -135.3100       6.2        29       221        95
IR     2025130    131400  -10.2700 -135.4100       6.8        46       216        90
IR     2025130    131400  -10.2300 -135.4800       6.2        40       208        75
IR     2025130    131400  -10.2500 -135.6100       4.5        40       192        85
IR     2025130    131400  -10.2300 -135.6800       6.5        43       189        98
IR     2025130    131400  -10.2500 -135.8100      10.8        58       185        96
IR     2025130    131400  -10.2700 -135.8300      11.6        56       185        97
IR     2025130    131400  -10.2700 -135.9800      14.4        52       178        96
IR     2025130    131400  -10.1900 -136.0900      16.8        49       159        99
IR     2025130    131400  -10.2700 -136.1200      17.2        45       161       100
IR     2025130    131400  -10.2500 -136.2200      18.5        46       152       100
IR     2025130    131400  -10.2300 -136.3300      19.9        46       142       100
IR     2025130    131400  -10.2700 -136.4600      19.9        44       135       100
IR     2025130    131400  -10.1900 -136.4700      19.1        45       133       100
IR     2025130    131400  -10.2500 -136.6400      17.6        43       127       100
IR     2025130    131400  -10.1900 -136.7100      17.4        45       121        99
IR     2025130    131400  -10.2300 -136.8200      16.8        40       122        99
IR     2025130    131400  -10.2100 -136.9000      16.6        37       121        98
IR     2025130    131400  -10.2500 -137.0100      16.5        32       120        99
IR     2025130    131400  -10.2100 -137.0800      16.7        33       119        99
IR     2025130    131400  -10.2500 -137.1500      17.4        30       116       100
IR     2025130    131400  -10.1900 -137.2300      17.0        32       114       100
IR     2025130    131400  -10.2100 -137.3700      16.3        12       108        99
IR     2025130    131400  -10.2100 -137.4700      16.2         7       108        96
IR     2025130    131400  -10.2100 -137.5600      16.1         3       109        98
IR     2025130    131400  -10.2300 -137.5800      15.8         5       109        97
IR     2025130    131400  -10.1900 -137.6700      16.6         6       112        72
IR     2025130    131400  -10.1900 -137.8200      17.2         6       121       100
IR     2025130    131400  -10.2100 -137.8500      15.6         4       126        92
IR     2025130    131400  -10.1900 -137.9600      13.8       349       133        86
IR     2025130    131400  -10.2400 -138.0300      12.5       339       136        90
IR     2025130    131400  -10.2400 -138.1800      13.9       338       135        94
IR     2025130    131400  -10.2200 -138.2700      14.4       339       138        99
IR     2025130    131400  -10.1900 -138.3700      13.8       334       143        97
IR     2025130    131400  -10.2100 -138.4200      14.4       337       150        98
IR     2025130    131400  -10.2600 -138.5300      15.6       348       162        97
IR     2025130    131400  -10.2400 -138.6200      17.0       355       172        97
IR     2025130    131400  -10.2600 -138.7500      15.8       354       183        96
IR     2025130    131400  -10.2600 -139.3400      11.8       356       228        97
IR     2025130    131400  -10.2600 -139.3900      11.8       357       232        94
IR     2025130    131400  -10.2000 -139.5600      12.1       347       270        99
IR     2025130    131400  -10.1900 -139.6500      11.8       354       279        94
IR     2025130    131400  -10.2600 -139.6700      12.5       350       290        93
IR     2025130    131400  -10.2600 -139.7600      11.9       352       317       100
IR     2025130    131400  -10.2600 -139.9200       9.9       349       356       100
IR     2025130    131400  -10.1900 -139.9600       7.9       337       358        79
IR     2025130    131400  -10.1900 -140.0300       7.7       342       355        81
IR     2025130    131400  -10.2600 -140.1600       8.4       355       342        98
IR     2025130    131400  -10.2400 -140.4500      10.2         2       446       100
IR     2025130    131400  -10.1900 -140.6400      11.8       358       524        96
IR     2025130    131400  -10.1900 -140.9300      14.1        23       277       100
IR     2025130    131400  -10.2600 -141.0200      11.1        24       249        99
IR     2025130    131400  -10.2400 -141.1100       9.7        35       219        96
IR     2025130    131400  -10.2600 -141.2400       8.3        45       204        82
IR     2025130    131400  -10.2600 -141.2600       8.3        44       204        85
IR     2025130    131400  -10.3300 -133.1700       4.5        62       207        84
IR     2025130    131400  -10.3500 -133.2400       5.4        60       211        82
IR     2025130    131400  -10.3300 -133.3500       5.1        57       229        81
IR     2025130    131400  -10.2900 -133.9100       8.2        75       328        75
IR     2025130    131400  -10.3300 -134.5600       6.7        66       254        96
IR     2025130    131400  -10.3100 -134.5700       5.1        72       254        97
IR     2025130    131400  -10.2900 -135.3900       6.8        47       218        95
IR     2025130    131400  -10.2900 -135.5500       4.2        38       197        88
IR     2025130    131400  -10.2900 -135.6600       4.3        20       190        96
IR     2025130    131400  -10.2900 -135.8300      13.1        52       186        92
IR     2025130    131400  -10.3600 -135.9000      18.5        45       188        96
IR     2025130    131400  -10.2900 -136.0100      16.4        45       177        96
IR     2025130    131400  -10.2900 -136.0300      15.9        47       174        89
IR     2025130    131400  -10.3000 -136.2000      17.1        46       156        99
IR     2025130    131400  -10.3000 -136.2900      18.7        44       146       100
IR     2025130    131400  -10.3200 -136.3400      19.4        43       142       100
IR     2025130    131400  -10.2800 -136.4700      19.8        44       135       100
IR     2025130    131400  -10.2800 -136.4900      19.7        44       134       100
IR     2025130    131400  -10.3000 -136.6000      18.4        43       130       100
IR     2025130    131400  -10.3600 -136.7300      18.0        39       131        99
IR     2025130    131400  -10.3600 -136.7800      17.8        37       131        99
IR     2025130    131400  -10.3400 -136.9300      17.1        31       129        98
IR     2025130    131400  -10.3200 -136.9900      16.6        30       126        97
IR     2025130    131400  -10.3400 -137.1200      17.0        23       116        99
IR     2025130    131400  -10.3000 -137.2100      17.5        24       113       100
IR     2025130    131400  -10.2800 -137.2300      17.6        24       113       100
IR     2025130    131400  -10.3000 -137.3200      16.8        14       110       100
IR     2025130    131400  -10.2800 -137.4800      16.0         6       108        99
IR     2025130    131400  -10.2800 -137.5600      15.8         6       109        99
IR     2025130    131400  -10.3600 -137.6500      14.6        10       116        98
IR     2025130    131400  -10.3600 -137.6900      13.0         7       120        97
IR     2025130    131400  -10.3400 -137.7800      10.9         5       130        92
IR     2025130    131400  -10.3600 -137.8900       7.7         8       138        96
IR     2025130    131400  -10.3000 -138.0200      11.0       352       138        95
IR     2025130    131400  -10.3400 -138.1300      13.0       343       136       100
IR     2025130    131400  -10.3400 -138.1400      13.9       342       135       100
IR     2025130    131400  -10.3500 -138.2900      15.2       347       137        99
IR     2025130    131400  -10.3200 -138.3300      14.9       345       140        98
IR     2025130    131400  -10.3500 -138.4200      15.5       347       153        99
IR     2025130    131400  -10.2800 -138.5300      15.7       349       162        97
IR     2025130    131400  -10.3500 -138.6800      16.2       353       180        91
IR     2025130    131400  -10.3400 -138.7300      15.6       351       181        92
IR     2025130    131400  -10.3000 -138.8600      14.9       349       218        99
IR     2025130    131400  -10.3400 -138.9100      14.4       348       229        99
IR     2025130    131400  -10.3500 -138.9900      14.1       348       242       100
IR     2025130    131400  -10.2800 -139.1000      14.5       353       223       100
IR     2025130    131400  -10.3300 -139.2100      11.7       352       222       100
IR     2025130    131400  -10.2800 -139.3200      11.5       355       227        98
IR     2025130    131400  -10.2800 -139.3400      11.6       356       228        98
IR     2025130    131400  -10.3500 -139.6700      12.7       350       306        93
IR     2025130    131400  -10.3500 -139.7200      12.7       351       328        99
IR     2025130    131400  -10.3200 -139.8100      12.1       352       335        99
IR     2025130    131400  -10.2800 -139.9400       9.6       351       364       100
IR     2025130    131400  -10.3000 -140.0000       8.9       353       360       100
IR     2025130    131400  -10.3000 -140.0900       8.7       357       344        98
IR     2025130    131400  -10.3200 -140.1800       8.8       357       342        97
IR     2025130    131400  -10.3500 -140.3100       9.7       357       344        99
IR     2025130    131400  -10.3300 -140.3600       9.3       359       345       100
IR     2025130    131400  -10.2800 -140.4500      10.0         2       438       100
IR     2025130    131400  -10.3300 -140.5800      11.9       357       606       100
IR     2025130    131400  -10.3300 -140.6000      12.0       358       626        99
IR     2025130    131400  -10.2800 -140.7600      11.6       360       628        95
IR     2025130    131400  -10.2800 -140.8200      11.3         0       618        93
IR     2025130    131400  -10.2800 -140.9500      12.1        20       274        98
IR     2025130    131400  -10.2800 -141.0000      11.2        21       255        99
IR     2025130    131400  -10.3000 -141.0600      10.3        23       255        99
IR     2025130    131400  -10.3300 -141.2000       9.0        21       271        92
IR     2025130    131400  -10.3200 -141.3000       8.5        37       217        96
IR     2025130    131400  -10.4300 -133.2600       4.4        58       215        80
IR     2025130    131400  -10.4400 -133.3500       4.7        43       218        86
IR     2025130    131400  -10.4000 -134.5500       8.3        56       251        97
IR     2025130    131400  -10.4000 -134.5900       6.0        57       249        97
IR     2025130    131400  -10.3800 -135.3700       7.3        53       223        99
IR     2025130    131400  -10.4000 -135.4600       8.7        68       219        98
IR     2025130    131400  -10.4400 -135.5500       5.9        79       214        99
IR     2025130    131400  -10.4500 -135.7700      10.0        27       194        88
IR     2025130    131400  -10.4500 -135.9000      18.4        39       190        93
IR     2025130    131400  -10.4300 -135.9200      18.5        42       189        96
IR     2025130    131400  -10.4000 -136.0700      15.6        45       175        97
IR     2025130    131400  -10.4200 -136.1000      15.4        43       174        98
IR     2025130    131400  -10.3800 -136.2100      15.9        45       159        99
IR     2025130    131400  -10.4300 -136.3200      17.1        42       150       100
IR     2025130    131400  -10.4300 -136.3800      18.2        42       146       100
IR     2025130    131400  -10.4100 -136.5300      19.5        43       139       100
IR     2025130    131400  -10.3800 -136.6000      18.9        42       136       100
IR     2025130    131400  -10.3800 -136.7100      18.3        39       133       100
IR     2025130    131400  -10.4500 -136.7800      18.3        35       134        99
IR     2025130    131400  -10.4300 -136.8600      18.2        32       133        99
IR     2025130    131400  -10.4500 -136.9900      17.6        26       132        97
IR     2025130    131400  -10.4300 -137.0400      17.3        23       127        98
IR     2025130    131400  -10.3800 -137.1900      17.3        20       114       100
IR     2025130    131400  -10.4500 -137.2200      17.2        12       115       100
IR     2025130    131400  -10.3900 -137.3500      15.8         8       111       100
IR     2025130    131400  -10.3900 -137.4500      15.1         3       110       100
IR     2025130    131400  -10.3900 -137.5200      15.5         2       110       100
IR     2025130    131400  -10.3700 -137.6500      14.4         9       116        99
IR     2025130    131400  -10.3700 -137.6800      12.5         6       121        99
IR     2025130    131400  -10.4300 -137.8300       7.2         9       133       100
IR     2025130    131400  -10.4100 -137.8900       6.7         4       135        94
IR     2025130    131400  -10.4500 -138.0100       9.2       360       136        98
IR     2025130    131400  -10.4500 -138.0700      10.4       354       136        99
IR     2025130    131400  -10.4500 -138.1200      12.4       350       135       100
IR     2025130    131400  -10.3700 -138.2700      15.4       347       136       100
IR     2025130    131400  -10.3700 -138.3100      15.4       348       138        99
IR     2025130    131400  -10.4100 -138.4400      15.7       352       156        99
IR     2025130    131400  -10.4500 -138.5600      15.9       354       173        95
IR     2025130    131400  -10.3700 -138.6600      16.5       353       180        91
IR     2025130    131400  -10.4500 -138.7100      15.8       351       184        95
IR     2025130    131400  -10.3900 -138.8400      14.5       345       206        98
IR     2025130    131400  -10.3700 -138.8600      14.3       345       208        98
IR     2025130    131400  -10.4100 -139.0200      13.7       346       242       100
IR     2025130    131400  -10.3900 -139.0400      13.3       347       232       100
IR     2025130    131400  -10.4100 -139.1300      12.2       348       225       100
IR     2025130    131400  -10.4300 -139.2600      10.8       351       225       100
IR     2025130    131400  -10.3700 -139.3400      11.5       356       228       100
IR     2025130    131400  -10.4500 -139.4800      10.6       354       258       100
IR     2025130    131400  -10.4500 -139.5400      10.3       354       297       100
IR     2025130    131400  -10.4300 -139.5900      10.3       351       326        99
IR     2025130    131400  -10.3900 -139.7000      12.3       351       330        98
IR     2025130    131400  -10.4100 -139.8100      12.5       356       335        99
IR     2025130    131400  -10.3900 -139.8700      12.5       359       336        99
IR     2025130    131400  -10.4500 -139.9900      10.7         5       367       100
IR     2025130    131400  -10.3700 -140.1200       9.0       359       347        99
IR     2025130    131400  -10.3900 -140.1400       9.1       359       346        99
IR     2025130    131400  -10.4100 -140.4000       9.1       357       335       100
IR     2025130    131400  -10.3900 -140.5100       9.3         0       322       100
IR     2025130    131400  -10.3700 -140.5800      10.1         1       322        99
IR     2025130    131400  -10.4500 -140.6900       9.0         6       645        88
IR     2025130    131400  -10.3700 -140.8400      10.4       358       613        92
IR     2025130    131400  -10.3900 -140.8700      10.6       357       601        96
IR     2025130    131400  -10.3700 -140.9500      11.4       356       588        98
IR     2025130    131400  -10.5400 -133.1600       4.1        45       209        92
IR     2025130    131400  -10.5200 -133.2000       4.4        52       210        92
IR     2025130    131400  -10.4800 -133.3500       4.9        41       215        82
IR     2025130    131400  -10.5400 -133.4200       4.6        43       217        69
IR     2025130    131400  -10.5500 -134.5000      12.7        55       250        94
IR     2025130    131400  -10.5000 -134.5900       7.5        49       247        96
IR     2025130    131400  -10.5500 -134.6600       4.5        47       245        88
IR     2025130    131400  -10.5300 -135.4400       5.6        71       228        97
IR     2025130    131400  -10.5500 -135.5500       4.5        67       216        96
IR     2025130    131400  -10.5300 -135.6400       4.9        17       205        64
IR     2025130    131400  -10.5100 -135.7100       5.9         6       200        70
IR     2025130    131400  -10.5300 -135.8800      17.6        31       191        98
IR     2025130    131400  -10.5100 -135.9400      19.0        32       190        99
IR     2025130    131400  -10.4700 -135.9900      18.0        34       187        99
IR     2025130    131400  -10.4900 -136.1000      16.2        31       179        99
IR     2025130    131400  -10.5300 -136.1800      15.3        37       171        98
IR     2025130    131400  -10.5500 -136.2700      15.4        41       162        99
IR     2025130    131400  -10.5300 -136.4100      18.1        43       148       100
IR     2025130    131400  -10.5100 -136.5100      19.2        45       144       100
IR     2025130    131400  -10.4700 -136.5400      19.2        44       143       100
IR     2025130    131400  -10.5300 -136.6900      18.6        35       141       100
IR     2025130    131400  -10.4700 -136.7600      18.2        35       135        99
IR     2025130    131400  -10.4700 -136.8400      18.3        33       134        99
IR     2025130    131400  -10.4700 -136.9900      17.7        26       132        97
IR     2025130    131400  -10.4700 -137.0600      17.8        21       128        99
IR     2025130    131400  -10.4700 -137.1300      17.7        17       120       100
IR     2025130    131400  -10.4700 -137.2400      17.2        10       115       100
IR     2025130    131400  -10.4900 -137.3300      16.2         5       114       100
IR     2025130    131400  -10.4900 -137.3700      15.9         4       114       100
IR     2025130    131400  -10.5000 -137.5000      15.7       357       114       100
IR     2025130    131400  -10.4700 -137.5600      16.1         1       113       100
IR     2025130    131400  -10.5000 -137.6800      13.7         3       122       100
IR     2025130    131400  -10.5000 -137.7800      11.2         8       128        99
IR     2025130    131400  -10.4700 -137.8900       7.0         9       133        96
IR     2025130    131400  -10.4700 -138.0000       8.8         3       136        98
IR     2025130    131400  -10.5000 -138.0500       9.9         1       134        98
IR     2025130    131400  -10.4700 -138.1100      11.6       352       135        99
IR     2025130    131400  -10.5400 -138.2500      13.9       356       140        98
IR     2025130    131400  -10.4800 -138.2900      14.5       354       142        99
IR     2025130    131400  -10.5200 -138.4500      14.9       359       161        98
IR     2025130    131400  -10.4700 -138.5500      15.6       355       170        94
IR     2025130    131400  -10.5000 -138.6400      15.9       356       181        95
IR     2025130    131400  -10.4800 -138.6700      15.8       354       183        95
IR     2025130    131400  -10.4800 -138.8000      15.5       348       194        98
IR     2025130    131400  -10.5400 -138.8900      14.5       346       201        99
IR     2025130    131400  -10.4800 -138.9700      14.6       347       204       100
IR     2025130    131400  -10.4700 -139.0600      13.0       345       236        99
IR     2025130    131400  -10.5200 -139.1100      11.5       347       230        99
IR     2025130    131400  -10.5400 -139.2800      10.3       350       226        96
IR     2025130    131400  -10.5400 -139.3000      10.6       350       226        96
IR     2025130    131400  -10.5000 -139.4600      10.2       351       257       100
IR     2025130    131400  -10.4800 -139.4800      10.1       352       263       100
IR     2025130    131400  -10.4600 -139.5700       9.6       353       326       100
IR     2025130    131400  -10.5200 -139.6600       8.7       357       333        96
IR     2025130    131400  -10.5400 -139.8100      11.1         7       332        99
IR     2025130    131400  -10.5000 -139.8700      11.7         6       337       100
IR     2025130    131400  -10.5200 -140.0100      11.2         8       370        99
IR     2025130    131400  -10.4600 -140.1000      10.2         6       352       100
IR     2025130    131400  -10.4600 -140.1200      10.2         5       349       100
IR     2025130    131400  -10.4600 -140.4300       9.2       357       326        98
IR     2025130    131400  -10.5200 -140.5300       9.0       359       315        99
IR     2025130    131400  -10.5000 -140.5600       8.2       357       306        97
IR     2025130    131400  -10.5400 -140.7300       9.9        13       641        80
IR     2025130    131400  -10.4600 -140.8200       9.3       357       620        97
IR     2025130    131400  -10.5000 -141.0000      10.3       349       560        98
IR     2025130    131400  -10.5400 -141.1700      11.0         4       339        99
IR     2025130    131400  -10.4800 -141.2600       9.3        10       319       100
IR     2025130    131400  -10.6300 -133.2900       4.5        37       209        72
IR     2025130    131400  -10.5700 -133.3800       5.3        42       214        63
IR     2025130    131400  -10.6400 -134.3600      13.3        56       250       100
IR     2025130    131400  -10.6400 -134.4200      13.9        55       241        99
IR     2025130    131400  -10.6100 -134.5500      10.5        52       246        96
IR     2025130    131400  -10.6100 -134.5700       9.5        51       245        94
IR     2025130    131400  -10.5800 -135.4600       4.7        66       230        95
IR     2025130    131400  -10.6000 -135.6200       5.0        35       208        90
IR     2025130    131400  -10.5800 -135.7700      10.3        40       196        98
IR     2025130    131400  -10.5700 -135.8200      13.6        38       193        99
IR     2025130    131400  -10.6400 -135.9000      12.9        24       191        94
IR     2025130    131400  -10.6400 -136.0100      18.3         9       187        90
IR     2025130    131400  -10.6000 -136.1400      17.6        23       179        99
IR     2025130    131400  -10.6200 -136.2500      17.5        35       167        99
IR     2025130    131400  -10.6200 -136.2700      17.7        37       166        99
IR     2025130    131400  -10.6400 -136.4100      20.3        41       157       100
IR     2025130    131400  -10.6200 -136.4500      20.3        43       154       100
IR     2025130    131400  -10.6400 -136.5400      20.7        35       152       100
IR     2025130    131400  -10.5800 -136.7100      19.5        26       141       100
IR     2025130    131400  -10.5600 -136.7600      19.3        25       137       100
IR     2025130    131400  -10.5800 -136.8600      19.0        22       131        99
IR     2025130    131400  -10.6400 -136.9800      18.9        18       128        97
IR     2025130    131400  -10.6400 -137.0200      19.0        16       128        97
IR     2025130    131400  -10.6400 -137.1500      19.4        11       125       100
IR     2025130    131400  -10.5600 -137.2000      18.1         9       120       100
IR     2025130    131400  -10.6000 -137.3500      17.8         0       119       100
IR     2025130    131400  -10.6200 -137.3700      18.2         0       117       100
IR     2025130    131400  -10.5600 -137.4800      16.0       355       116       100
IR     2025130    131400  -10.6000 -137.6300      16.0       360       117       100
IR     2025130    131400  -10.6000 -137.7200      14.5         4       123       100
IR     2025130    131400  -10.6000 -137.9200      10.2         2       128        99
IR     2025130    131400  -10.6300 -138.0700      11.9         1       132        98
IR     2025130    131400  -10.5600 -138.1200      12.4       355       136        98
IR     2025130    131400  -10.5800 -138.2200      13.5       358       140        98
IR     2025130    131400  -10.6100 -138.3200      13.5         4       153        99
IR     2025130    131400  -10.5800 -138.4400      14.3         2       162        98
IR     2025130    131400  -10.6000 -138.5300      14.2         2       173        94
IR     2025130    131400  -10.5600 -138.6200      15.6       358       182        94
IR     2025130    131400  -10.5800 -138.6900      15.3       355       184        95
IR     2025130    131400  -10.5800 -138.7800      15.5       351       186        98
IR     2025130    131400  -10.5800 -138.8800      14.8       347       199        99
IR     2025130    131400  -10.5600 -138.9100      14.5       346       202        99
IR     2025130    131400  -10.5600 -139.0200      12.7       344       245       100
IR     2025130    131400  -10.6100 -139.1300       9.7       339       258        96
IR     2025130    131400  -10.6100 -139.2600       9.7       340       231        97
IR     2025130    131400  -10.6100 -139.2800      10.0       341       231        97
IR     2025130    131400  -10.5600 -139.4100      10.8       351       239       100
IR     2025130    131400  -10.6100 -139.4600       9.6       342       288       100
IR     2025130    131400  -10.5800 -139.5700       7.9       349       328        94
IR     2025130    131400  -10.5900 -139.8100      10.9         8       326        98
IR     2025130    131400  -10.6300 -139.9800      12.6         8       351        98
IR     2025130    131400  -10.6100 -140.0700      12.5         7       359        98
IR     2025130    131400  -10.6300 -140.1400      12.4         7       344        96
IR     2025130    131400  -10.5800 -140.2000      11.4         4       347        97
IR     2025130    131400  -10.6300 -140.3200      10.7         1       342        94
IR     2025130    131400  -10.5900 -140.4300      10.5         0       330        98
IR     2025130    131400  -10.5900 -140.4500      10.5         1       325        98
IR     2025130    131400  -10.5600 -140.6200       9.0         1       296        97
IR     2025130    131400  -10.5600 -140.6700       8.8       359       221        78
IR     2025130    131400  -10.5800 -140.7300      10.0        11       639        88
IR     2025130    131400  -10.6300 -140.8900       9.3       360       559        86
IR     2025130    131400  -10.6100 -140.9800       9.9       354       535        97
IR     2025130    131400  -10.5600 -141.1500      10.6         4       336        98
IR     2025130    131400  -10.5800 -141.1900      10.6         0       346        99
IR     2025130    131400  -10.6900 -133.0600       4.0        16       208        93
IR     2025130    131400  -10.6700 -133.3100       4.8        41       209        63
IR     2025130    131400  -10.7200 -133.4300       4.3        46       215        62
IR     2025130    131400  -10.6900 -133.4700       4.3        43       215        60
IR     2025130    131400  -10.6800 -133.9200       4.9        50       330        78
IR     2025130    131400  -10.6800 -134.3100      11.3        56       251       100
IR     2025130    131400  -10.7400 -134.3600      12.4        55       240       100
IR     2025130    131400  -10.6800 -134.4500      14.0        55       238        97
IR     2025130    131400  -10.7400 -134.6000      10.4        51       243        86
IR     2025130    131400  -10.7200 -134.7100       4.3        47       260        99
IR     2025130    131400  -10.6600 -135.0700      10.9        36       315        87
IR     2025130    131400  -10.6600 -135.1200      11.6        33       277        99
IR     2025130    131400  -10.6600 -135.2100       9.4        26       241       100
IR     2025130    131400  -10.7000 -135.6400       6.1         9       214        98
IR     2025130    131400  -10.7000 -135.7100       7.5        14       207        96
IR     2025130    131400  -10.7100 -135.7800       6.7        45       199        97
IR     2025130    131400  -10.6600 -135.9500      15.7        13       189        88
IR     2025130    131400  -10.6800 -136.0100      17.7         7       188        90
IR     2025130    131400  -10.7100 -136.0800      20.2         5       186        95
IR     2025130    131400  -10.6800 -136.2300      19.3        27       170        99
IR     2025130    131400  -10.7100 -136.3200      21.5        33       164       100
IR     2025130    131400  -10.7300 -136.3900      22.1        37       160       100
IR     2025130    131400  -10.6600 -136.4500      21.0        42       156       100
IR     2025130    131400  -10.6700 -136.5400      21.4        32       153       100
IR     2025130    131400  -10.7100 -136.6300      23.1        17       148       100
IR     2025130    131400  -10.6700 -136.7800      21.6        12       137       100
IR     2025130    131400  -10.7300 -136.8700      20.6        10       127        98
IR     2025130    131400  -10.7100 -137.0600      20.0        12       123        98
IR     2025130    131400  -10.6500 -137.1500      19.9        10       125       100
IR     2025130    131400  -10.6900 -137.3100      19.5         1       120       100
IR     2025130    131400  -10.6700 -137.3500      19.1         0       117       100
IR     2025130    131400  -10.7100 -137.4400      18.6       358       116       100
IR     2025130    131400  -10.6700 -138.2500      12.5        12       147        94
IR     2025130    131400  -10.6900 -138.2900      12.2        13       151        97
IR     2025130    131400  -10.6700 -138.4200      12.1         8       162       100
IR     2025130    131400  -10.6500 -138.4900      12.6         6       169        95
IR     2025130    131400  -10.6700 -138.6200      12.6         5       182        91
IR     2025130    131400  -10.7100 -138.7100      13.0         0       185        94
IR     2025130    131400  -10.7300 -138.8000      13.5       352       189        99
IR     2025130    131400  -10.7100 -138.8600      13.9       347       200       100
IR     2025130    131400  -10.6700 -138.9100      14.1       346       240       100
IR     2025130    131400  -10.6500 -139.0600      10.4       342       293       100
IR     2025130    131400  -10.7100 -139.1300      10.1       335       287        96
IR     2025130    131400  -10.7100 -139.2400      10.5       330       238        95
IR     2025130    131400  -10.6500 -139.2800      10.2       338       233        97
IR     2025130    131400  -10.6700 -139.3900      10.4       338       241       100
IR     2025130    131400  -10.7100 -139.4600       9.7       340       281       100
IR     2025130    131400  -10.6700 -139.6100       7.2       336       325       100
IR     2025130    131400  -10.6500 -139.7000       7.5       355       328        91
IR     2025130    131400  -10.6500 -139.7700       9.4         3       330        93
IR     2025130    131400  -10.7200 -139.8800      11.0         5       334        94
IR     2025130    131400  -10.6500 -139.9600      12.5         8       342        98
IR     2025130    131400  -10.7100 -140.2300      12.3         6       336        96
IR     2025130    131400  -10.7200 -140.5100      11.7       357       309        96
IR     2025130    131400  -10.7100 -140.5300      11.9       358       309       100
IR     2025130    131400  -10.7100 -140.8200       9.1         1       606       100
IR     2025130    131400  -10.7200 -141.0600       9.5       351       567        92
IR     2025130    131400  -10.7200 -141.1300       9.2       345       372        98
IR     2025130    131400  -10.8000 -132.7600       4.3        26       213        97
IR     2025130    131400  -10.8200 -132.8500       4.0        25       210        88
IR     2025130    131400  -10.7800 -133.2700       4.0        31       208        78
IR     2025130    131400  -10.7600 -133.4300       4.6        43       216        62
IR     2025130    131400  -10.8300 -134.9700       6.8        22       315        83
IR     2025130    131400  -10.7900 -135.0800      11.0        28       238        99
IR     2025130    131400  -10.7500 -135.1700      11.0        28       229        98
IR     2025130    131400  -10.7900 -135.7600       8.2        27       205        85
IR     2025130    131400  -10.8300 -135.8200      11.8        12       203        73
IR     2025130    131400  -10.7500 -135.9500      14.7         6       191        66
IR     2025130    131400  -10.7500 -135.9900      16.4         5       190        76
IR     2025130    131400  -10.7500 -136.1000      21.2         4       186        95
IR     2025130    131400  -10.8200 -136.2100      22.2        12       176       100
IR     2025130    131400  -10.7500 -136.2600      22.2        24       168        99
IR     2025130    131400  -10.7500 -136.4100      22.5        38       160       100
IR     2025130    131400  -10.7500 -136.4300      22.6        38       159       100
IR     2025130    131400  -10.7700 -136.5400      22.6        29       155        99
IR     2025130    131400  -10.8200 -136.6100      22.9        19       149       100
IR     2025130    131400  -10.8200 -136.7400      23.5         7       137       100
IR     2025130    131400  -10.7500 -136.8500      21.1         8       129        98
IR     2025130    131400  -10.7900 -136.8900      19.7        11       125        98
IR     2025130    131400  -10.8200 -137.0200      17.8        15       123        96
IR     2025130    131400  -10.7500 -137.3100      19.8         2       117       100
IR     2025130    131400  -10.8000 -137.7000      16.9       358       123       100
IR     2025130    131400  -10.7600 -137.8300      15.1         0       126       100
IR     2025130    131400  -10.7600 -137.9200      12.6         1       131        87
IR     2025130    131400  -10.8200 -138.1800      12.5        16       142       100
IR     2025130    131400  -10.8200 -138.1900      12.6        17       144       100
IR     2025130    131400  -10.8200 -138.3600      13.5        15       157       100
IR     2025130    131400  -10.8200 -138.3800      13.4        16       158       100
IR     2025130    131400  -10.8200 -138.4700      12.5        13       169        99
IR     2025130    131400  -10.8000 -138.6400      11.5        10       182        92
IR     2025130    131400  -10.7800 -138.6700      12.0         6       184        90
IR     2025130    131400  -10.7600 -138.8200      13.1       351       199       100
IR     2025130    131400  -10.7600 -138.8400      13.2       349       202       100
IR     2025130    131400  -10.7800 -138.9300      12.5       344       258       100
IR     2025130    131400  -10.7400 -139.0600      10.5       340       303        99
IR     2025130    131400  -10.8200 -139.1500      12.0       332       277        95
IR     2025130    131400  -10.7600 -139.2600      10.8       327       239        93
IR     2025130    131400  -10.8200 -139.4600       9.1       341       247        97
IR     2025130    131400  -10.8000 -139.5500       9.4       338       308        97
IR     2025130    131400  -10.7400 -139.7000       8.0       349       325        93
IR     2025130    131400  -10.8200 -139.7700       9.5       355       330        92
IR     2025130    131400  -10.7400 -139.8700      10.6         3       328        92
IR     2025130    131400  -10.8200 -139.9600      11.9         1       337        99
IR     2025130    131400  -10.7600 -140.0300      12.3         3       332        95
IR     2025130    131400  -10.7800 -140.1800      12.4         3       328        99
IR     2025130    131400  -10.7800 -140.2000      12.3         3       328        98
IR     2025130    131400  -10.7800 -140.2900      11.9         3       325        97
IR     2025130    131400  -10.8000 -140.4300      11.8         1       298       100
IR     2025130    131400  -10.8200 -140.8700       8.7       347       572        99
IR     2025130    131400  -10.7800 -140.9300       9.3       348       565        98
IR     2025130    131400  -10.8200 -141.0400       9.3       350       623        94
IR     2025130    131400  -10.7400 -141.0900       9.5       353       588        93
IR     2025130    131400  -10.7800 -141.4100       9.8       346       389        90
IR     2025130    131400  -10.9300 -132.7600       5.6        12       213        98
IR     2025130    131400  -10.8900 -132.8300       5.1        18       211        98
IR     2025130    131400  -10.8600 -132.9300       4.2        13       208        94
IR     2025130    131400  -10.8500 -134.9700       7.2        23       308        85
IR     2025130    131400  -10.8800 -135.0200       8.4        26       242        96
IR     2025130    131400  -10.8600 -135.3200      11.8        19       224        99
IR     2025130    131400  -10.8400 -135.6700       7.1         8       216        99
IR     2025130    131400  -10.8400 -135.7600      11.9        10       209        99
IR     2025130    131400  -10.8400 -135.8600      13.6         9       201        73
IR     2025130    131400  -10.9200 -135.9500      18.7         4       192        91
IR     2025130    131400  -10.8400 -136.1000      21.1         3       188        98
IR     2025130    131400  -10.8400 -136.2100      22.2        11       178       100
IR     2025130    131400  -10.8400 -136.2200      22.2        14       175       100
IR     2025130    131400  -10.8400 -136.3900      22.6        31       160       100
IR     2025130    131400  -10.9000 -136.4100      21.9        28       159        99
IR     2025130    131400  -10.8800 -136.5400      22.7        24       155       100
IR     2025130    131400  -10.8400 -136.6300      22.8        16       146       100
IR     2025130    131400  -10.8600 -136.7200      22.5         9       138       100
IR     2025130    131400  -10.9200 -136.8000      18.4        17       134        97
IR     2025130    131400  -10.8400 -136.9400      17.3        17       126        98
IR     2025130    131400  -10.9000 -136.9800      17.2        15       128        98
IR     2025130    131400  -10.9100 -137.1300      18.1         8       123       100
IR     2025130    131400  -10.9000 -137.2200      18.8         7       123        99
IR     2025130    131400  -10.9100 -137.3100      19.2         7       123       100
IR     2025130    131400  -10.9000 -137.4900      18.8       351       123        91
IR     2025130    131400  -10.8600 -137.7500      16.6       358       128        95
IR     2025130    131400  -10.9100 -137.8800      13.0       356       138       100
IR     2025130    131400  -10.8900 -138.1800      13.6        13       145        99
IR     2025130    131400  -10.8800 -138.2700      13.4        16       150       100
IR     2025130    131400  -10.8600 -138.3400      13.8        15       155       100
IR     2025130    131400  -10.8400 -138.3800      13.5        16       158       100
IR     2025130    131400  -10.8900 -138.5200      13.1        10       172       100
IR     2025130    131400  -10.8900 -138.6300      12.0         7       180        97
IR     2025130    131400  -10.8900 -138.7300      12.5       360       183        98
IR     2025130    131400  -10.8400 -138.8200      12.8       352       199       100
IR     2025130    131400  -10.8600 -138.8600      12.9       349       203       100
IR     2025130    131400  -10.9100 -138.9300      12.9       347       208        99
IR     2025130    131400  -10.8900 -139.0800      12.7       341       254       100
IR     2025130    131400  -10.8400 -139.1500      12.5       333       273        96
IR     2025130    131400  -10.8400 -139.2800      11.9       331       242        85
IR     2025130    131400  -10.8700 -139.3500      11.1       334       238        97
IR     2025130    131400  -10.8600 -139.4400       9.5       339       235        96
IR     2025130    131400  -10.8700 -139.8100      10.5       355       335        94
IR     2025130    131400  -10.9100 -139.9200      11.0       359       339        97
IR     2025130    131400  -10.8400 -140.2000      12.0         4       331        99
IR     2025130    131400  -10.8500 -140.2900      12.0         4       320        99
IR     2025130    131400  -10.8500 -140.3800      11.8         1       297        98
IR     2025130    131400  -10.8700 -140.4300      11.1       359       297       100
IR     2025130    131400  -10.9100 -140.7100      10.2       346       248       100
IR     2025130    131400  -10.8400 -140.8400       9.5       327       228        90
IR     2025130    131400  -10.8900 -140.9100      10.2       329       227        92
IR     2025130    131400  -10.8700 -140.9700       9.2       343       618        98
IR     2025130    131400  -10.8500 -141.2200       9.1       353       553        97
IR     2025130    131400  -10.9500 -132.7400       5.9        13       213        98
IR     2025130    131400  -10.9500 -133.0700       4.7        15       203        91
IR     2025130    131400  -11.0200 -133.2600       8.6        31       218        90
IR     2025130    131400  -10.9400 -135.3700      11.1        18       223        99
IR     2025130    131400  -10.9800 -135.6500       6.9         6       215        97
IR     2025130    131400  -10.9900 -135.7200       9.0        14       213        98
IR     2025130    131400  -10.9900 -135.8700      16.6        11       203       100
IR     2025130    131400  -10.9900 -135.9300      18.6         8       192        96
IR     2025130    131400  -10.9900 -136.0400      22.5         2       189        97
IR     2025130    131400  -10.9700 -136.0900      23.2         1       188       100
IR     2025130    131400  -10.9400 -136.2400      22.9         8       176       100
IR     2025130    131400  -10.9400 -136.2800      22.9        10       171       100
IR     2025130    131400  -10.9900 -136.4400      21.7        19       159       100
IR     2025130    131400  -10.9400 -136.4800      22.2        23       157        99
IR     2025130    131400  -10.9900 -136.5900      20.4        18       152       100
IR     2025130    131400  -10.9900 -136.7000      19.1        13       140       100
IR     2025130    131400  -10.9300 -136.7800      18.7        16       135        99
IR     2025130    131400  -10.9900 -136.8300      17.2        22       136        99
IR     2025130    131400  -10.9300 -137.0000      16.7        15       128        98
IR     2025130    131400  -10.9300 -137.0300      16.7        12       126        98
IR     2025130    131400  -10.9500 -137.1400      17.5         7       126       100
IR     2025130    131400  -10.9500 -137.2000      18.2         5       126       100
IR     2025130    131400  -10.9500 -137.3500      19.6         5       126        99
IR     2025130    131400  -10.9500 -137.3800      19.9         2       126        98
IR     2025130    131400  -10.9300 -137.5300      18.5       347       126        87
IR     2025130    131400  -10.9900 -137.6200      17.1       340       131        94
IR     2025130    131400  -10.9700 -137.6600      16.8       341       131        96
IR     2025130    131400  -10.9900 -137.8200      14.0       349       134        99
IR     2025130    131400  -10.9900 -138.2300      16.3         4       145        99
IR     2025130    131400  -11.0100 -138.2800      16.6         5       149       100
IR     2025130    131400  -10.9700 -138.4300      16.0        11       157        99
IR     2025130    131400  -10.9500 -138.5200      14.4        11       167        99
IR     2025130    131400  -10.9300 -138.6000      13.1        10       177        95
IR     2025130    131400  -10.9500 -138.7100      13.1         1       178        95
IR     2025130    131400  -10.9300 -138.8000      12.8       355       185        96
IR     2025130    131400  -10.9500 -138.8900      12.9       350       195       100
IR     2025130    131400  -10.9500 -138.9100      12.9       350       198       100
IR     2025130    131400  -11.0000 -139.0000      13.1       345       226        99
IR     2025130    131400  -11.0000 -139.1700      13.2       335       252        95
IR     2025130    131400  -10.9500 -139.2400      12.7       332       244        95
IR     2025130    131400  -10.9300 -139.3300      11.8       331       240        87
IR     2025130    131400  -10.9300 -139.3700      11.1       334       236        99
IR     2025130    131400  -10.9900 -139.6800      11.9       345       292        98
IR     2025130    131400  -11.0000 -139.7700      11.3       354       323        97
IR     2025130    131400  -10.9800 -140.1400      10.8         7       324        95
IR     2025130    131400  -10.9700 -140.2500      11.8         3       326        99
IR     2025130    131400  -10.9800 -140.3200      11.5         5       321       100
IR     2025130    131400  -10.9700 -140.4900      10.9         1       316       100
IR     2025130    131400  -10.9700 -140.5100      10.3       358       317        93
IR     2025130    131400  -10.9300 -140.6400      10.6       354       319        97
IR     2025130    131400  -11.0000 -140.7500      10.9       350       339        99
IR     2025130    131400  -11.0000 -140.8400      10.2       342       319        96
IR     2025130    131400  -10.9300 -140.8900      10.3       335       232        94
IR     2025130    131400  -11.0000 -141.0200       8.2       348       601        99
IR     2025130    131400  -11.0000 -141.1100       9.0       351       530        96
IR     2025130    131400  -11.0000 -141.1700       9.0       352       476        99
IR     2025130    131400  -10.9300 -141.3100       9.4       354       446       100
IR     2025130    131400  -10.9300 -141.4100       8.5       354       407        96
IR     2025130    131400  -11.0600 -132.7900       6.5         6       201        99
IR     2025130    131400  -11.0400 -132.8100       5.7         3       201        97
IR     2025130    131400  -11.1200 -132.9900       4.5        15       205        97
IR     2025130    131400  -11.1000 -133.1300       6.1        25       207        96
IR     2025130    131400  -11.0600 -133.2000       8.3        29       209        85
IR     2025130    131400  -11.1100 -134.3100       8.7        48       269        96
IR     2025130    131400  -11.0900 -134.4300       9.6        48       235        99
IR     2025130    131400  -11.0500 -135.6900       8.1         9       213        98
IR     2025130    131400  -11.0900 -135.7600       8.8        14       209       100
IR     2025130    131400  -11.0500 -135.8500      13.4        12       206       100
IR     2025130    131400  -11.0900 -135.9400      16.0        10       192        97
IR     2025130    131400  -11.0700 -136.0200      20.0         5       190        97
IR     2025130    131400  -11.1000 -136.1300      22.4         3       185        99
IR     2025130    131400  -11.0700 -136.2400      22.4         6       177        99
IR     2025130    131400  -11.0500 -136.3700      21.3        13       166       100
IR     2025130    131400  -11.0300 -136.3900      21.3        15       163       100
IR     2025130    131400  -11.0300 -136.5200      21.2        15       158       100
IR     2025130    131400  -11.0500 -136.5700      20.5        15       156       100
IR     2025130    131400  -11.1000 -136.6800      18.6        15       153       100
IR     2025130    131400  -11.0600 -136.7600      17.9        18       142       100
IR     2025130    131400  -11.1000 -136.8800      17.3        30       146       100
IR     2025130    131400  -11.1000 -136.9600      15.5        25       145        99
IR     2025130    131400  -11.0500 -137.1100      16.8         7       132        99
IR     2025130    131400  -11.0300 -137.1600      17.8         4       130       100
IR     2025130    131400  -11.0800 -137.2900      19.2       360       131        98
IR     2025130    131400  -11.0800 -137.3100      19.2       359       131        98
IR     2025130    131400  -11.0300 -137.4000      19.3         0       130       100
IR     2025130    131400  -11.0400 -137.5500      17.5       345       134        94
IR     2025130    131400  -11.0300 -137.6200      17.4       338       134        94
IR     2025130    131400  -11.0300 -137.6800      16.7       336       134        95
IR     2025130    131400  -11.0400 -137.8400      13.9       343       136        99
IR     2025130    131400  -11.0400 -138.1900      17.0       356       142       100
IR     2025130    131400  -11.0200 -138.3000      16.9         6       149        99
IR     2025130    131400  -11.0400 -138.4500      15.6        25       155        98
IR     2025130    131400  -11.0400 -138.4700      15.3        25       156        98
IR     2025130    131400  -11.0600 -138.6000      14.5        11       164        95
IR     2025130    131400  -11.0200 -138.7300      13.7         0       177        89
IR     2025130    131400  -11.0400 -138.7800      13.2       357       178        88
IR     2025130    131400  -11.0200 -138.9100      12.6       351       188        97
IR     2025130    131400  -11.0400 -138.9300      12.3       350       189        95
IR     2025130    131400  -11.0400 -139.0900      12.8       338       246        99
IR     2025130    131400  -11.0600 -139.1100      13.0       337       251       100
IR     2025130    131400  -11.0400 -139.2000      13.3       335       252        96
IR     2025130    131400  -11.1000 -139.3500      13.2       325       239        98
IR     2025130    131400  -11.0600 -139.4400      12.4       322       234        94
IR     2025130    131400  -11.0600 -139.5500      12.5       329       244        88
IR     2025130    131400  -11.0600 -139.5700      12.1       332       252        85
IR     2025130    131400  -11.0600 -139.7000      12.0       347       271        91
IR     2025130    131400  -11.1000 -139.8300      10.9       358       311        99
IR     2025130    131400  -11.1000 -139.8500      10.6       358       314        99
IR     2025130    131400  -11.0400 -140.0100      10.6         0       325       100
IR     2025130    131400  -11.0400 -140.0500      10.7         2       324        99
IR     2025130    131400  -11.1000 -140.1200      10.8         4       321        97
IR     2025130    131400  -11.0800 -140.2500      11.2         5       324        99
IR     2025130    131400  -11.0600 -140.3200      11.0         9       332       100
IR     2025130    131400  -11.0200 -140.4200      10.3       358       313        97
IR     2025130    131400  -11.0200 -140.4900      10.5       358       330        93
IR     2025130    131400  -11.1000 -140.6500      10.7       355       344       100
IR     2025130    131400  -11.0200 -140.8700       9.8       339       342        97
IR     2025130    131400  -11.0200 -140.9800       9.6       334       361        97
IR     2025130    131400  -11.0600 -141.0900       9.0       350       473        95
IR     2025130    131400  -11.0600 -141.1100       9.1       348       471        95
IR     2025130    131400  -11.0800 -141.2400       8.8       358       446        98
IR     2025130    131400  -11.0200 -141.3000       9.2       357       442        99
IR     2025130    131400  -11.1600 -132.7100       7.1        10       204        99
IR     2025130    131400  -11.1900 -132.8600       5.9        10       202        98
IR     2025130    131400  -11.1500 -132.9700       5.4        20       205        97
IR     2025130    131400  -11.1400 -132.9900       5.0        18       205        97
IR     2025130    131400  -11.1400 -133.1100       5.4        23       204        95
IR     2025130    131400  -11.1500 -133.2200       9.1        29       210        75
IR     2025130    131400  -11.2100 -133.3300       7.7        28       233        73
IR     2025130    131400  -11.1300 -134.3000       8.5        47       272        92
IR     2025130    131400  -11.1900 -134.4100       5.6        44       239        94
IR     2025130    131400  -11.1500 -134.4400       7.5        47       211       100
IR     2025130    131400  -11.1800 -134.5400       7.2        48       234        74
IR     2025130    131400  -11.1300 -135.0700      10.9        43       242        99
IR     2025130    131400  -11.1800 -135.8900      13.0        14       202        90
IR     2025130    131400  -11.1200 -135.9400      15.6        11       192        93
IR     2025130    131400  -11.1200 -136.0200      19.4         6       190        97
IR     2025130    131400  -11.1200 -136.1500      22.6         3       184        99
IR     2025130    131400  -11.1800 -136.2000      21.2         5       181       100
IR     2025130    131400  -11.1600 -136.3300      21.9         7       172       100
IR     2025130    131400  -11.1400 -136.4600      20.3        14       166       100
IR     2025130    131400  -11.1400 -136.4800      20.5        14       164       100
IR     2025130    131400  -11.1800 -136.6400      19.3        18       158       100
IR     2025130    131400  -11.1200 -136.7000      18.8        15       153       100
IR     2025130    131400  -11.1400 -136.8300      17.2        29       151       100
IR     2025130    131400  -11.1600 -136.9000      15.9        30       154        99
IR     2025130    131400  -11.1900 -136.9400      14.3        26       154        97
IR     2025130    131400  -11.1200 -137.1100      13.6        13       140        99
IR     2025130    131400  -11.1200 -137.2000      19.2       356       132       100
IR     2025130    131400  -11.1400 -137.2900      19.1       356       133        96
IR     2025130    131400  -11.1200 -137.3800      19.6       354       132        97
IR     2025130    131400  -11.1400 -137.4200      19.0       356       134        94
IR     2025130    131400  -11.1400 -137.5100      19.1       350       139       100
IR     2025130    131400  -11.1700 -137.5800      18.7       344       143       100
IR     2025130    131400  -11.1200 -137.6900      17.5       330       139        99
IR     2025130    131400  -11.1400 -137.7700      16.2       326       138       100
IR     2025130    131400  -11.1900 -137.8800      14.3       333       138        98
IR     2025130    131400  -11.1900 -138.1200      17.2       331       138        99
IR     2025130    131400  -11.1700 -138.3700      13.1        25       147        96
IR     2025130    131400  -11.1400 -138.5400      13.0        26       158        76
IR     2025130    131400  -11.1500 -138.6300      12.9        16       165        92
IR     2025130    131400  -11.1500 -138.7200      12.9         8       173        88
IR     2025130    131400  -11.1200 -138.8200      12.4       356       178        88
IR     2025130    131400  -11.1200 -138.9100      12.0       350       186        96
IR     2025130    131400  -11.1700 -139.0000      13.1       347       189        98
IR     2025130    131400  -11.1900 -139.3900      13.4       320       227        99
IR     2025130    131400  -11.1900 -139.4400      13.2       317       229       100
IR     2025130    131400  -11.1200 -139.5500      13.5       325       245        98
IR     2025130    131400  -11.1200 -139.7000      12.3       345       265        97
IR     2025130    131400  -11.1200 -139.7900      11.3       356       294        99
IR     2025130    131400  -11.1200 -139.8100      11.0       357       298        99
IR     2025130    131400  -11.1300 -139.9600       9.5       358       324        98
IR     2025130    131400  -11.1700 -140.0500       9.8       357       323        97
IR     2025130    131400  -11.1700 -140.0800      10.1       359       321        94
IR     2025130    131400  -11.1500 -140.2300      11.0         3       320        99
IR     2025130    131400  -11.1200 -140.2700      11.0         5       322        98
IR     2025130    131400  -11.1300 -140.4300      10.2         1       331        77
IR     2025130    131400  -11.1900 -140.5300       9.6       357       348        76
IR     2025130    131400  -11.1900 -140.5600       9.4       355       349        79
IR     2025130    131400  -11.1300 -140.8000       9.5       354       376       100
IR     2025130    131400  -11.1300 -140.9500      10.0       341       431        89
IR     2025130    131400  -11.1500 -140.9800       9.7       343       442        83
IR     2025130    131400  -11.1900 -141.0800       9.0       346       444        88
IR     2025130    131400  -11.1200 -141.2400       8.6       359       444        99
IR     2025130    131400  -11.1200 -141.2600       8.5       359       442        99
IR     2025130    131400  -11.2500 -132.7700       7.2        14       207       100
IR     2025130    131400  -11.2300 -132.8000       7.1        13       204       100
IR     2025130    131400  -11.2700 -132.9300       6.4        23       206        96
IR     2025130    131400  -11.2500 -132.9700       6.8        23       201        99
IR     2025130    131400  -11.3000 -133.1400       9.2        19       202        99
IR     2025130    131400  -11.3000 -133.1800       9.5        20       207        97
IR     2025130    131400  -11.2500 -133.2900       7.1        20       221        90
IR     2025130    131400  -11.3000 -133.3400       6.9        19       240        95
IR     2025130    131400  -11.3000 -133.6800       7.3        20       210        71
IR     2025130    131400  -11.2400 -134.5000       7.0        41       234        76
IR     2025130    131400  -11.2200 -134.6600       8.1        61       233        99
IR     2025130    131400  -11.2900 -135.6800      10.8        12       207        96
IR     2025130    131400  -11.2900 -135.7900      11.9        20       206        96
IR     2025130    131400  -11.2500 -135.8300      12.0        13       205        89
IR     2025130    131400  -11.2200 -135.9800      17.9         7       191        96
IR     2025130    131400  -11.2700 -136.0100      16.2         7       191       100
IR     2025130    131400  -11.2700 -136.0900      16.4         7       190       100
IR     2025130    131400  -11.2300 -136.1800      17.4        11       187        93
IR     2025130    131400  -11.2900 -136.3500      17.1        17       182        97
IR     2025130    131400  -11.2100 -136.4400      18.2        15       170        99
IR     2025130    131400  -11.2100 -136.4600      18.4        15       169       100
IR     2025130    131400  -11.2700 -136.6200      20.0        16       163       100
IR     2025130    131400  -11.2300 -136.7200      18.4        21       159       100
IR     2025130    131400  -11.2100 -136.7500      17.3        23       158       100
IR     2025130    131400  -11.2900 -136.8600      14.4        32       159        99
IR     2025130    131400  -11.2700 -136.9900      13.0        23       157        94
IR     2025130    131400  -11.2700 -137.0800      13.2        17       158        87
IR     2025130    131400  -11.2900 -137.1000      13.2        13       159        91
IR     2025130    131400  -11.2900 -137.2300      13.0         6       160        99
IR     2025130    131400  -11.2900 -137.3600      12.4         0       157        98
IR     2025130    131400  -11.2900 -137.4200      14.9       349       153        65
IR     2025130    131400  -11.2900 -137.5500      19.4       342       150        97
IR     2025130    131400  -11.2500 -137.6000      18.8       342       148       100
IR     2025130    131400  -11.2500 -137.7300      16.7       337       149       100
IR     2025130    131400  -11.2700 -137.7500      15.9       340       150       100
IR     2025130    131400  -11.2700 -137.8800      13.7       340       152       100
IR     2025130    131400  -11.2300 -138.0100      15.7       327       142       100
IR     2025130    131400  -11.2300 -138.0200      16.2       325       140        99
IR     2025130    131400  -11.2900 -138.1500      14.6       313       145        93
IR     2025130    131400  -11.2100 -138.2100      15.1       332       140        98
IR     2025130    131400  -11.2300 -138.3400      10.5        12       147        97
IR     2025130    131400  -11.2300 -138.4300      12.3        36       154        92
IR     2025130    131400  -11.2500 -138.4800      12.9        38       158        80
IR     2025130    131400  -11.2500 -138.6100      13.5        28       164        80
IR     2025130    131400  -11.2100 -138.7100      13.6        15       170        91
IR     2025130    131400  -11.2700 -138.8300      13.9         8       177        84
IR     2025130    131400  -11.2800 -138.8900      14.0         4       179        90
IR     2025130    131400  -11.2700 -139.0200      14.1       354       185        99
IR     2025130    131400  -11.2100 -139.3900      13.4       320       227       100
IR     2025130    131400  -11.2300 -139.4600      13.4       316       227       100
IR     2025130    131400  -11.2800 -139.6100      11.7       335       235        99
IR     2025130    131400  -11.2600 -139.6400      10.9       342       246        97
IR     2025130    131400  -11.2600 -139.8100       9.4         6       267        90
IR     2025130    131400  -11.2500 -139.8300       9.5         4       272        93
IR     2025130    131400  -11.2600 -140.1000      10.1       358       317       100
IR     2025130    131400  -11.2800 -140.1800       9.8       357       314        97
IR     2025130    131400  -11.2300 -140.3200       9.4         8       296        99
IR     2025130    131400  -11.2100 -140.4200       9.6         6       299        74
IR     2025130    131400  -11.2100 -140.5300       9.3       358       346        75
IR     2025130    131400  -11.2100 -140.5800       9.0       355       350        82
IR     2025130    131400  -11.2600 -140.6700       8.4       351       380        98
IR     2025130    131400  -11.2500 -140.8000       8.4       357       392       100
IR     2025130    131400  -11.2100 -140.8200       8.6       355       392       100
IR     2025130    131400  -11.2500 -140.9100       9.5       350       437        98
IR     2025130    131400  -11.2100 -141.0800       8.9       347       442        90
IR     2025130    131400  -11.2100 -141.1000       8.8       348       441        91
IR     2025130    131400  -11.2600 -141.2400       8.5       359       436       100
IR     2025130    131400  -11.2100 -141.3300       8.8       358       437        97
IR     2025130    131400  -11.3400 -132.7600       5.8        10       213        95
IR     2025130    131400  -11.3600 -132.8400       5.4        14       211        97
IR     2025130    131400  -11.3400 -132.9100       5.9        20       205        97
IR     2025130    131400  -11.4000 -132.9900       7.0        19       205       100
IR     2025130    131400  -11.3200 -133.1600      10.1        21       204        97
IR     2025130    131400  -11.4000 -133.2100      10.8        25       215        94
IR     2025130    131400  -11.4000 -133.2800       9.9        24       230        96
IR     2025130    131400  -11.3600 -133.6200       8.0        21       235        86
IR     2025130    131400  -11.3400 -133.6800       7.4        19       210        74
IR     2025130    131400  -11.3900 -133.7500       4.9        15       241        99
IR     2025130    131400  -11.3900 -134.2300       8.1        25       310        82
IR     2025130    131400  -11.3300 -134.3600       6.4        35       297        84
IR     2025130    131400  -11.3300 -134.4000       6.6        35       290        72
IR     2025130    131400  -11.3500 -134.6600      10.3        37       226        98
IR     2025130    131400  -11.3300 -134.7500       7.9        54       246        94
IR     2025130    131400  -11.3100 -135.2900      14.5        29       246        99
IR     2025130    131400  -11.3700 -135.3600      13.6        19       247        99
IR     2025130    131400  -11.3300 -135.6400      10.2        10       209        98
IR     2025130    131400  -11.3100 -135.6800      10.8        13       208        97
IR     2025130    131400  -11.3800 -135.9700       9.4        28       193        96
IR     2025130    131400  -11.3800 -136.0300       9.7        23       192        84
IR     2025130    131400  -11.3800 -136.1000      10.7        15       191        91
IR     2025130    131400  -11.3300 -136.2700      15.2        16       189        99
IR     2025130    131400  -11.3500 -136.3300      15.5        16       188        93
IR     2025130    131400  -11.3600 -136.3800      17.6        11       187       100
IR     2025130    131400  -11.3800 -136.4700      17.7        13       182        98
IR     2025130    131400  -11.3100 -136.6200      19.5        16       165       100
IR     2025130    131400  -11.3600 -136.7100      16.4        19       166       100
IR     2025130    131400  -11.3400 -136.7500      16.0        23       163       100
IR     2025130    131400  -11.3100 -136.8600      14.2        31       160        98
IR     2025130    131400  -11.3400 -137.0100      13.5        15       159        86
IR     2025130    131400  -11.3400 -137.0300      13.7        15       159        85
IR     2025130    131400  -11.3600 -137.1200      14.0        10       160        89
IR     2025130    131400  -11.3800 -137.2700      12.3         6       161        98
IR     2025130    131400  -11.3100 -137.3800      12.4         0       157        90
IR     2025130    131400  -11.3100 -137.5600      18.9       341       153        99
IR     2025130    131400  -11.3100 -137.6000      18.5       341       154       100
IR     2025130    131400  -11.3000 -137.6700      18.2       340       154        99
IR     2025130    131400  -11.3200 -137.8200      14.1       350       155        99
IR     2025130    131400  -11.3400 -137.8900      13.6       349       158        99
IR     2025130    131400  -11.3200 -137.9700      13.4       328       156        97
IR     2025130    131400  -11.3000 -138.0400      15.5       316       152        98
IR     2025130    131400  -11.3000 -138.3200       6.9       355       152        83
IR     2025130    131400  -11.3400 -138.5800      10.2        37       164        72
IR     2025130    131400  -11.3400 -138.6500      11.9        30       167        82
IR     2025130    131400  -11.3400 -138.7000      12.9        25       169        91
IR     2025130    131400  -11.3000 -138.8500      14.1         9       177        84
IR     2025130    131400  -11.3200 -138.9400      15.1         1       180        96
IR     2025130    131400  -11.3200 -138.9800      15.0       358       181        99
IR     2025130    131400  -11.3000 -139.0700      14.6       351       185       100
IR     2025130    131400  -11.3800 -139.1600      14.9       344       190        99
IR     2025130    131400  -11.3000 -139.2900      14.2       331       219        98
IR     2025130    131400  -11.3400 -139.3500      14.4       330       215       100
IR     2025130    131400  -11.3800 -139.4800      14.4       328       220        99
IR     2025130    131400  -11.3000 -139.5900      12.4       333       231        99
IR     2025130    131400  -11.3000 -139.6100      12.0       336       233        98
IR     2025130    131400  -11.3200 -139.7700       9.5       359       251        80
IR     2025130    131400  -11.3000 -139.7900       9.5         3       260        83
IR     2025130    131400  -11.3000 -139.9400       8.9       359       294        97
IR     2025130    131400  -11.3000 -139.9900       9.1       359       303        98
IR     2025130    131400  -11.3800 -140.1400       8.9       352       316        99
IR     2025130    131400  -11.3000 -140.1800       9.5       354       314        97
IR     2025130    131400  -11.3200 -140.3200       7.7       351       295        96
IR     2025130    131400  -11.3800 -140.3400       7.6       346       314        96
IR     2025130    131400  -11.3800 -140.5100       9.8       357       333        90
IR     2025130    131400  -11.3600 -140.6000       9.4       353       371        97
IR     2025130    131400  -11.3800 -140.6200       9.4       352       379        97
IR     2025130    131400  -11.3000 -140.7100       8.6       353       383        97
IR     2025130    131400  -11.3000 -140.8600       9.2       357       440        99
IR     2025130    131400  -11.3800 -140.9100       9.9       358       451        98
IR     2025130    131400  -11.3200 -140.9800       9.8       355       444        96
IR     2025130    131400  -11.3800 -141.0800       9.6       352       442        95
IR     2025130    131400  -11.4200 -132.7200       5.6         6       216        94
IR     2025130    131400  -11.4500 -133.0400       7.5        18       208        97
IR     2025130    131400  -11.4500 -133.2300       9.6        22       222        96
IR     2025130    131400  -11.4300 -133.2500       9.9        23       222        97
IR     2025130    131400  -11.4900 -133.3400      10.3        21       242        99
IR     2025130    131400  -11.4500 -134.2100       8.7        23       303        80
IR     2025130    131400  -11.4100 -134.2700       8.0        24       292        95
IR     2025130    131400  -11.4800 -134.6200      12.3        22       233        87
IR     2025130    131400  -11.4800 -134.7100      11.6        27       226        72
IR     2025130    131400  -11.4800 -134.7300      11.3        28       226        67
IR     2025130    131400  -11.4400 -135.3400      13.5        16       252        95
IR     2025130    131400  -11.4800 -135.6000       9.1        12       229        94
IR     2025130    131400  -11.4000 -136.2000      11.7        18       191        98
IR     2025130    131400  -11.4200 -136.3100      13.2        15       190        96
IR     2025130    131400  -11.4200 -136.4500      16.1        13       186        99
IR     2025130    131400  -11.4200 -136.4700      16.6        12       185        99
IR     2025130    131400  -11.4400 -136.6400      15.0        10       175        91
IR     2025130    131400  -11.4800 -136.7300      14.3         6       178        96
IR     2025130    131400  -11.4800 -136.8200      13.1         7       179        94
IR     2025130    131400  -11.4700 -136.9200      12.4         2       179        95
IR     2025130    131400  -11.4700 -136.9500      12.5         2       178        89
IR     2025130    131400  -11.4400 -137.0600      13.3         8       166        79
IR     2025130    131400  -11.4000 -137.1700      13.8         9       161        90
IR     2025130    131400  -11.4000 -137.2300      13.0        11       162        98
IR     2025130    131400  -11.4000 -137.3200      11.2        19       162        83
IR     2025130    131400  -11.4400 -137.5600      14.9       335       160        82
IR     2025130    131400  -11.4200 -137.6400      16.9       340       158        94
IR     2025130    131400  -11.4400 -137.7300      14.8       359       160        99
IR     2025130    131400  -11.4700 -137.8400      13.7         7       163        99
IR     2025130    131400  -11.4000 -137.9100      13.3       352       160        99
IR     2025130    131400  -11.4300 -137.9700      13.6       337       161        93
IR     2025130    131400  -11.4000 -138.1100      15.5       307       158        74
IR     2025130    131400  -11.4000 -138.5000       6.5        41       162        62
IR     2025130    131400  -11.4500 -138.6700       8.4        40       168        61
IR     2025130    131400  -11.4700 -138.6900       7.1        43       168        63
IR     2025130    131400  -11.4000 -138.7800      13.8        24       170        86
IR     2025130    131400  -11.4500 -138.9400      18.4         4       175        85
IR     2025130    131400  -11.4000 -139.0400      16.3       358       178        97
IR     2025130    131400  -11.4700 -139.1300      14.8       350       183        98
IR     2025130    131400  -11.4700 -139.2200      13.8       341       194        99
IR     2025130    131400  -11.4500 -139.2400      13.8       339       198        99
IR     2025130    131400  -11.4700 -139.3300      14.3       336       204        99
IR     2025130    131400  -11.4500 -139.4800      14.5       329       218        97
IR     2025130    131400  -11.4700 -139.5500      13.3       334       218        91
IR     2025130    131400  -11.4000 -139.6400      11.5       342       225        90
IR     2025130    131400  -11.4300 -139.7200       9.6       346       214        81
IR     2025130    131400  -11.4100 -139.8100       8.8       353       225        81
IR     2025130    131400  -11.4700 -140.0500      10.5         5       309       100
IR     2025130    131400  -11.4000 -140.1400       9.2       353       317       100
IR     2025130    131400  -11.4300 -140.2900       7.9       343       323        99
IR     2025130    131400  -11.4300 -140.5300      10.1       353       340        97
IR     2025130    131400  -11.4700 -140.6400       9.9       353       364       100
IR     2025130    131400  -11.4700 -140.6900       9.5       353       388       100
IR     2025130    131400  -11.4700 -140.7600       9.1       357       444       100
IR     2025130    131400  -11.4100 -140.9100       9.6       359       455       100
IR     2025130    131400  -11.4100 -141.0200       9.5       356       452       100
IR     2025130    131400  -11.4100 -141.0400       9.4       354       450        99
IR     2025130    131400  -11.4500 -141.1500       8.7       356       439        89
IR     2025130    131400  -11.5300 -132.7600       5.1         3       227        87
IR     2025130    131400  -11.5700 -133.0400       7.5        13       214        92
IR     2025130    131400  -11.5500 -133.2000      10.0        20       222        99
IR     2025130    131400  -11.5300 -133.2400      10.0        21       228        99
IR     2025130    131400  -11.5800 -133.3900       9.2        15       240        98
IR     2025130    131400  -11.5800 -133.4300       9.1        15       242        96
IR     2025130    131400  -11.5600 -133.5200       9.4        16       245        98
IR     2025130    131400  -11.5200 -134.6200      11.7        22       261        88
IR     2025130    131400  -11.5000 -134.7300      11.9        26       232        73
IR     2025130    131400  -11.5000 -135.3400      13.2        13       256        94
IR     2025130    131400  -11.5000 -135.6000       8.5        13       231        92
IR     2025130    131400  -11.5300 -135.6900       4.1        35       236        76
IR     2025130    131400  -11.5000 -135.7500       5.7        38       239        91
IR     2025130    131400  -11.5200 -135.8200       4.5        50       242        83
IR     2025130    131400  -11.5000 -135.9200       5.4        35       209        89
IR     2025130    131400  -11.5300 -136.1900       7.3        20       197        98
IR     2025130    131400  -11.5500 -136.2500       8.3        18       195        93
IR     2025130    131400  -11.5500 -136.4000      13.8         7       192        92
IR     2025130    131400  -11.5500 -136.4700      14.1         9       190        89
IR     2025130    131400  -11.5300 -136.5600      14.6         8       188        97
IR     2025130    131400  -11.5500 -136.6900      14.0         6       186       100
IR     2025130    131400  -11.5700 -136.7500      13.6         4       187       100
IR     2025130    131400  -11.5700 -136.8200      12.8       360       187        98
IR     2025130    131400  -11.5300 -136.9700      12.5       347       183       100
IR     2025130    131400  -11.5700 -137.0600      13.7       331       184        95
IR     2025130    131400  -11.5700 -137.5200       5.2       351       167        79
IR     2025130    131400  -11.4900 -137.6900      12.5       343       162        87
IR     2025130    131400  -11.5100 -137.7600      10.1       344       164        78
IR     2025130    131400  -11.4900 -137.8000      11.5         5       163        98
IR     2025130    131400  -11.4900 -137.9300       9.0         1       164        90
IR     2025130    131400  -11.5100 -138.8000       6.4        31       171        62
IR     2025130    131400  -11.5500 -139.0700      13.7       345       179        80
IR     2025130    131400  -11.5500 -139.1400      14.1       343       183        92
IR     2025130    131400  -11.4900 -139.2200      13.8       341       193        99
IR     2025130    131400  -11.5100 -139.2900      14.0       339       201        99
IR     2025130    131400  -11.5600 -139.4400      14.5       332       214        95
IR     2025130    131400  -11.5100 -139.5300      14.0       333       216        90
IR     2025130    131400  -11.5600 -139.5500      13.6       332       211        84
IR     2025130    131400  -11.5100 -139.6800      11.2       337       210        87
IR     2025130    131400  -11.5600 -139.7500      10.5       335       206        89
IR     2025130    131400  -11.5600 -139.9900      10.1         2       311        99
IR     2025130    131400  -11.5600 -140.1000       9.0         2       322        95
IR     2025130    131400  -11.5100 -140.4000       9.7       348       320       100
IR     2025130    131400  -11.5600 -140.4900      10.1       352       334       100
IR     2025130    131400  -11.5600 -140.6000       9.2       353       347        99
IR     2025130    131400  -11.4900 -140.6400       9.9       353       361       100
IR     2025130    131400  -11.4900 -140.7100       9.4       353       395       100
IR     2025130    131400  -11.5100 -140.8000       8.8       358       456       100
IR     2025130    131400  -11.5300 -140.9100       7.9       355       467        99
IR     2025130    131400  -11.5600 -141.0600       8.9       353       461        98
IR     2025130    131400  -11.5100 -141.1100       9.3       355       448        97
IR     2025130    131400  -11.4900 -141.2100       9.3       353       438        91
IR     2025130    131400  -11.5600 -141.2600       9.8       353       438        93
IR     2025130    131400  -11.6200 -132.7000       6.0         6       220        98
IR     2025130    131400  -11.6200 -133.1800       8.4        17       224        97
IR     2025130    131400  -11.6000 -133.2000       8.9        17       223        99
IR     2025130    131400  -11.6000 -133.3700       9.1        16       238        99
IR     2025130    131400  -11.6200 -133.4300       8.9        16       241        97
IR     2025130    131400  -11.5900 -134.7500      11.9        25       292        62
IR     2025130    131400  -11.6300 -135.1500      11.4        30       260        98
IR     2025130    131400  -11.6500 -135.4500       9.7       357       302        95
IR     2025130    131400  -11.6400 -136.4900      11.1         9       192        99
IR     2025130    131400  -11.6600 -136.5800      12.2         8       192        99
IR     2025130    131400  -11.6100 -136.6900      13.6         3       188       100
IR     2025130    131400  -11.5900 -136.7500      13.4         2       187        99
IR     2025130    131400  -11.5900 -136.9000      13.2       349       187        98
IR     2025130    131400  -11.6400 -136.9100      13.1       346       188        98
IR     2025130    131400  -11.6400 -137.0600      15.1       329       187        99
IR     2025130    131400  -11.5900 -137.5800       6.3       334       170        94
IR     2025130    131400  -11.5800 -137.7100       9.0       343       169        98
IR     2025130    131400  -11.6400 -137.7400       6.3       328       172        88
IR     2025130    131400  -11.5800 -137.8900       4.3        25       171        64
IR     2025130    131400  -11.5800 -138.4800       4.4       287       170        69
IR     2025130    131400  -11.6600 -139.0700      12.3       341       180        81
IR     2025130    131400  -11.6200 -139.1600      13.3       343       184        86
IR     2025130    131400  -11.6000 -139.2200      13.2       341       191        91
IR     2025130    131400  -11.6200 -139.2900      13.3       341       204        96
IR     2025130    131400  -11.5800 -139.3800      14.0       338       210        96
IR     2025130    131400  -11.6000 -139.4600      14.5       330       214        97
IR     2025130    131400  -11.6000 -139.5700      13.4       332       209        86
IR     2025130    131400  -11.6400 -139.7200      12.2       338       209        95
IR     2025130    131400  -11.6000 -139.7900      11.0       337       207        97
IR     2025130    131400  -11.5800 -139.8400      10.4       342       251        97
IR     2025130    131400  -11.5800 -139.9700       9.8       359       311       100
IR     2025130    131400  -11.5800 -140.0800       8.9         3       322        95
IR     2025130    131400  -11.5800 -140.1000       8.7         2       323        92
IR     2025130    131400  -11.6400 -140.1900       9.8       355       325       100
IR     2025130    131400  -11.5800 -140.2900      10.2       350       323        99
IR     2025130    131400  -11.5800 -140.4500      10.4       352       329        99
IR     2025130    131400  -11.5800 -140.4900      10.1       352       336        99
IR     2025130    131400  -11.5800 -140.6000       8.9       353       347       100
IR     2025130    131400  -11.6600 -140.6500       8.2       359       355        99
IR     2025130    131400  -11.6400 -140.8200       8.3       359       451        98
IR     2025130    131400  -11.6600 -140.8400       8.1       357       452        97
IR     2025130    131400  -11.6600 -140.9700       7.3       360       469        97
IR     2025130    131400  -11.6400 -141.0200       7.8       356       461        91
IR     2025130    131400  -11.6400 -141.1100       8.4       355       451        92
IR     2025130    131400  -11.6600 -141.2100       9.1       346       442        81
IR     2025130    131400  -11.5800 -141.3700       9.9       351       437        90
IR     2025130    131400  -11.7300 -132.9200       6.8         2       221        95
IR     2025130    131400  -11.7200 -132.9400       6.7         4       222        94
IR     2025130    131400  -11.7000 -133.1100       6.6         8       226        98
IR     2025130    131400  -11.7000 -133.1600       6.9        10       225        98
IR     2025130    131400  -11.7700 -133.2700       7.5        13       221        97
IR     2025130    131400  -11.7300 -133.3900       7.6        12       238        95
IR     2025130    131400  -11.7700 -133.4000       7.5        11       239        93
IR     2025130    131400  -11.7600 -134.8700      10.0        31       338        90
IR     2025130    131400  -11.7200 -135.2500      11.9        21       261        99
IR     2025130    131400  -11.7000 -135.5100       7.5       350       305        76
IR     2025130    131400  -11.7200 -136.3200       6.0        17       213        91
IR     2025130    131400  -11.7400 -136.4100       7.8        12       207       100
IR     2025130    131400  -11.7600 -136.5600       9.4       358       207        96
IR     2025130    131400  -11.7600 -136.6200      10.7       356       206        99
IR     2025130    131400  -11.6800 -136.7600      12.4         0       189       100
IR     2025130    131400  -11.7400 -136.7800      12.3       351       191        93
IR     2025130    131400  -11.6800 -136.9100      13.6       343       189        94
IR     2025130    131400  -11.7000 -137.0400      17.1       328       189        99
IR     2025130    131400  -11.6800 -137.1300      15.4       320       186        78
IR     2025130    131400  -11.7000 -137.1500      19.6       322       187        88
IR     2025130    131400  -11.7500 -137.5200       7.3       262       179        73
IR     2025130    131400  -11.7300 -137.6500       4.4       282       176        65
IR     2025130    131400  -11.7000 -137.7200       4.6       306       175        98
IR     2025130    131400  -11.7500 -138.0600       7.6       133       178        73
IR     2025130    131400  -11.7500 -138.1100       7.2       132       179        99
IR     2025130    131400  -11.7100 -138.4800       5.4       280       178        89
IR     2025130    131400  -11.7100 -138.5500       6.3       269       178        80
IR     2025130    131400  -11.7300 -138.6300       8.2       261       179        79
IR     2025130    131400  -11.7500 -138.7400       9.2       258       181        91
IR     2025130    131400  -11.7500 -138.9800       8.2       348       183        67
IR     2025130    131400  -11.6800 -139.0700      11.8       341       181        79
IR     2025130    131400  -11.7100 -139.0900      11.8       339       183        79
IR     2025130    131400  -11.7100 -139.2400      12.8       346       197        86
IR     2025130    131400  -11.6800 -139.3100      12.8       344       206        95
IR     2025130    131400  -11.7100 -139.4000      12.5       343       208        95
IR     2025130    131400  -11.7100 -139.4800      13.3       334       208        97
IR     2025130    131400  -11.7500 -139.6200      13.7       338       216        97
IR     2025130    131400  -11.7300 -139.7000      13.0       335       240        98
IR     2025130    131400  -11.7300 -139.7300      12.6       333       271       100
IR     2025130    131400  -11.7500 -139.8300      12.1       338       297        98
IR     2025130    131400  -11.7500 -139.9700       8.8       348       318        99
IR     2025130    131400  -11.7500 -140.0600       8.4       358       321       100
IR     2025130    131400  -11.7500 -140.2700       9.3       347       324        99
IR     2025130    131400  -11.7300 -140.3800      10.6       346       329       100
IR     2025130    131400  -11.7100 -140.5300       9.3       355       338        99
IR     2025130    131400  -11.6900 -140.5400       9.0       356       341        99
IR     2025130    131400  -11.6900 -140.6400       8.0       358       347        98
IR     2025130    131400  -11.7500 -140.8000       8.1       360       428        98
IR     2025130    131400  -11.7500 -140.8200       8.4         0       429        99
IR     2025130    131400  -11.6800 -140.9900       6.9       357       467        98
IR     2025130    131400  -11.6800 -141.0000       6.9       355       465        97
IR     2025130    131400  -11.6800 -141.1000       7.9       356       452        91
IR     2025130    131400  -11.7500 -141.1900       8.9       347       444        74
IR     2025130    131400  -11.7500 -141.3200       9.6       349       442        70
IR     2025130    131400  -11.8100 -132.8400       7.8         6       216        71
IR     2025130    131400  -11.8300 -132.9900       8.3        15       234        99
IR     2025130    131400  -11.7900 -133.0300       7.8        11       232        95
IR     2025130    131400  -11.8600 -133.1900       7.9        17       214        97
IR     2025130    131400  -11.7900 -133.2500       7.8        15       219        98
IR     2025130    131400  -11.8600 -133.3300       8.3        16       238        98
IR     2025130    131400  -11.7900 -133.4000       7.6        12       244        95
IR     2025130    131400  -11.8400 -133.7200       9.1        17       303       100
IR     2025130    131400  -11.8600 -133.7500       8.1        14       304        93
IR     2025130    131400  -11.8600 -134.7800       8.4        28       319        87
IR     2025130    131400  -11.8400 -134.9300       9.8        23       341        80
IR     2025130    131400  -11.8600 -135.0000      11.0        19       320        95
IR     2025130    131400  -11.8500 -135.5000       7.4       341       252        89
IR     2025130    131400  -11.8300 -136.4500       4.0        17       213        87
IR     2025130    131400  -11.8500 -136.5600       5.8       353       211        98
IR     2025130    131400  -11.8500 -136.6700       8.9       351       211       100
IR     2025130    131400  -11.8300 -136.7800      10.4       348       206        99
IR     2025130    131400  -11.8500 -136.8200      12.2       340       205        82
IR     2025130    131400  -11.7900 -136.9700      18.0       330       191        98
IR     2025130    131400  -11.8300 -137.0400      18.2       326       190        83
IR     2025130    131400  -11.7700 -137.1300      18.6       322       189        70
IR     2025130    131400  -11.7900 -138.0700       7.4       134       180        95
IR     2025130    131400  -11.7900 -138.6500       9.3       262       181        80
IR     2025130    131400  -11.7900 -138.8100       5.3       300       184        81
IR     2025130    131400  -11.8100 -138.9400       8.2       346       185        82
IR     2025130    131400  -11.7700 -139.0000       8.9       351       184        72
IR     2025130    131400  -11.8400 -139.1200      12.8       344       188        65
IR     2025130    131400  -11.7900 -139.2200      13.1       347       197        83
IR     2025130    131400  -11.7900 -139.2700      12.7       348       203        88
IR     2025130    131400  -11.7700 -139.3600      11.9       348       205        99
IR     2025130    131400  -11.8400 -139.4900      12.2       345       209        99
IR     2025130    131400  -11.8300 -139.5700      13.3       340       217        99
IR     2025130    131400  -11.7700 -139.6800      13.6       339       263        97
IR     2025130    131400  -11.7900 -139.7700      13.0       336       293        97
IR     2025130    131400  -11.7700 -139.7900      12.7       336       292        98
IR     2025130    131400  -11.7900 -139.9500       8.7       341       317        99
IR     2025130    131400  -11.7900 -139.9700       8.6       344       318        99
IR     2025130    131400  -11.8100 -140.0600       8.1       355       317        96
IR     2025130    131400  -11.8400 -140.2300       8.2       350       337       100
IR     2025130    131400  -11.8200 -140.2700       8.6       347       328        99
IR     2025130    131400  -11.8200 -140.3400       9.1       345       336        96
IR     2025130    131400  -11.7900 -140.5100       8.6       353       338        98
IR     2025130    131400  -11.8400 -140.7300       7.8       358       339        99
IR     2025130    131400  -11.7900 -140.8600       7.8         3       425        80
IR     2025130    131400  -11.7900 -140.9500       7.5        11       518        83
IR     2025130    131400  -11.7700 -141.0000       7.3         2       456        90
IR     2025130    131400  -11.8100 -141.0800       7.8       356       453        75
IR     2025130    131400  -11.8400 -141.3900       7.5       354       448        69
IR     2025130    131400  -11.9000 -132.9300       8.4        14       229        80
IR     2025130    131400  -11.9600 -133.0200       9.3        16       214        78
IR     2025130    131400  -11.9200 -133.0800       8.2        14       205        84
IR     2025130    131400  -11.9600 -133.1400       8.7        16       198        97
IR     2025130    131400  -11.8800 -133.3100       8.1        15       230        97
IR     2025130    131400  -11.8800 -133.3200       8.3        16       242        96
IR     2025130    131400  -11.9000 -133.4900      11.4        24       356       100
IR     2025130    131400  -11.9000 -133.7300       8.4        14       307        99
IR     2025130    131400  -11.9000 -133.7700       7.9        10       307        94
IR     2025130    131400  -11.9500 -134.9200       9.6        17       341        78
IR     2025130    131400  -11.8700 -135.3900      10.3       355       255        93
IR     2025130    131400  -11.8700 -135.4500       9.1       348       252        93
IR     2025130    131400  -11.9100 -136.6100       7.9       347       211        98
IR     2025130    131400  -11.8900 -136.6700       8.9       350       211       100
IR     2025130    131400  -11.8700 -136.8400      12.7       338       203        80
IR     2025130    131400  -11.9400 -136.8500      13.5       336       205        89
IR     2025130    131400  -11.9200 -136.9600      17.6       326       197        99
IR     2025130    131400  -11.9000 -137.1100      16.2       326       191        64
IR     2025130    131400  -11.9400 -138.6300       4.2       327       189        62
IR     2025130    131400  -11.9400 -138.8700       7.6         5       188        60
IR     2025130    131400  -11.9400 -139.0100       8.7       335       190        81
IR     2025130    131400  -11.8800 -139.1200      12.4       347       193        65
IR     2025130    131400  -11.8600 -139.1600      12.7       345       196        63
IR     2025130    131400  -11.9000 -139.3100      10.6       359       203        93
IR     2025130    131400  -11.8800 -139.4000      11.1       357       206       100
IR     2025130    131400  -11.8600 -139.4700      12.0       349       209        99
IR     2025130    131400  -11.9200 -139.5100      12.0       347       218       100
IR     2025130    131400  -11.9400 -139.7700      11.9       345       320        98
IR     2025130    131400  -11.9000 -139.9000      10.3       343       327        99
IR     2025130    131400  -11.9200 -140.1900       7.5       348       309        99
IR     2025130    131400  -11.9200 -140.2100       7.5       348       315        98
IR     2025130    131400  -11.9400 -140.3000       7.5       352       319       100
IR     2025130    131400  -11.9200 -140.4000       8.6       345       336       100
IR     2025130    131400  -11.9200 -140.5200       8.8       349       333        97
IR     2025130    131400  -11.8600 -140.6500       8.4       353       336        98
IR     2025130    131400  -11.9200 -140.9100       7.0       359       233        92
IR     2025130    131400  -11.9200 -140.9300       6.6         3       232        87
IR     2025130    131400  -11.9000 -141.1000       5.7        12       552        75
IR     2025130    131400  -12.0200 -132.9700       8.9        14       207        75
IR     2025130    131400  -12.0200 -133.0400       9.0        14       198        77
IR     2025130    131400  -12.0000 -133.1900       8.4        14       204        93
IR     2025130    131400  -11.9800 -133.2500       7.9        11       215        91
IR     2025130    131400  -12.0500 -133.3800       9.7        21       353        83
IR     2025130    131400  -12.0500 -133.4100      10.4        24       341        89
IR     2025130    131400  -12.0100 -133.4900      10.9        25       338        99
IR     2025130    131400  -12.0100 -133.6400       8.3        11       365       100
IR     2025130    131400  -11.9700 -133.6800       8.1         8       361        99
IR     2025130    131400  -11.9900 -133.8400       9.8         8       307        99
IR     2025130    131400  -11.9700 -133.9000      10.8        15       305       100
IR     2025130    131400  -12.0400 -134.6600       7.3         5       319        91
IR     2025130    131400  -11.9900 -134.7000       7.2        11       312        96
IR     2025130    131400  -11.9900 -134.7900       8.0        18       314        92
IR     2025130    131400  -11.9700 -134.9200      10.1        17       343        80
IR     2025130    131400  -12.0200 -135.0500      12.9        17       315        90
IR     2025130    131400  -11.9700 -135.5200       5.0       348       246        88
IR     2025130    131400  -12.0200 -136.2000       5.3       331       211        94
IR     2025130    131400  -12.0400 -136.3000       4.0       328       222        84
IR     2025130    131400  -12.0000 -136.6300       7.0       351       210        88
IR     2025130    131400  -12.0200 -136.7200       8.3       349       209       100
IR     2025130    131400  -11.9800 -136.8500      13.1       338       205        91
IR     2025130    131400  -11.9800 -136.8700      13.5       336       204        94
IR     2025130    131400  -12.0400 -137.0400      14.8       333       194        89
IR     2025130    131400  -12.0400 -137.0900      14.1       331       192        84
IR     2025130    131400  -12.0400 -137.1800      13.4       337       192        97
IR     2025130    131400  -12.0200 -137.2400      13.7       340       192        96
IR     2025130    131400  -12.0300 -137.3500      14.7       328       194        96
IR     2025130    131400  -12.0000 -137.4400      14.9       322       196        65
IR     2025130    131400  -12.0300 -137.9000       6.7       113       189        99
IR     2025130    131400  -12.0300 -138.0200       5.8       119       189       100
IR     2025130    131400  -12.0300 -138.1100       4.2       118       188        84
IR     2025130    131400  -12.0300 -138.3500       4.8        90       191        98
IR     2025130    131400  -12.0300 -138.6400       5.5       352       191        84
IR     2025130    131400  -11.9600 -138.8700       7.5         7       189        60
IR     2025130    131400  -11.9600 -138.9900       8.2       329       190        80
IR     2025130    131400  -12.0300 -139.1000       7.8       305       203        67
IR     2025130    131400  -12.0100 -139.2500       8.5         0       203        73
IR     2025130    131400  -11.9600 -139.3300      10.1         3       204        95
IR     2025130    131400  -12.0300 -139.4400      10.9       352       215        96
IR     2025130    131400  -12.0300 -139.4700      11.5       350       235        98
IR     2025130    131400  -11.9700 -140.1200       8.0       343       297        95
IR     2025130    131400  -11.9600 -140.1900       7.3       344       299        93
IR     2025130    131400  -11.9700 -140.4300       7.9       351       328       100
IR     2025130    131400  -11.9900 -140.5100       7.5       353       327        99
IR     2025130    131400  -11.9600 -140.6200       7.8       344       331        88
IR     2025130    131400  -11.9600 -140.7100       7.8       340       326        87
IR     2025130    131400  -11.9600 -140.7600       7.8       342       322        85
IR     2025130    131400  -11.9600 -140.9300       7.6       357       231        98
IR     2025130    131400  -11.9900 -140.9700       8.2       359       230        98
IR     2025130    131400  -12.0100 -141.0800       7.2       351       227        85
IR     2025130    131400  -12.0300 -141.2300       6.1       355       332        64
IR     2025130    131400  -12.1500 -132.7500       7.6         4       188        96
IR     2025130    131400  -12.0700 -132.9600       8.2        11       198        74
IR     2025130    131400  -12.1100 -133.0400       8.2         9       197        68
IR     2025130    131400  -12.0900 -133.1300       8.8        14       198       100
IR     2025130    131400  -12.1300 -133.2200       8.4        13       229        98
IR     2025130    131400  -12.0900 -133.3700       9.7        21       319        80
IR     2025130    131400  -12.0700 -133.4100      10.3        24       309        87
IR     2025130    131400  -12.0900 -133.5600       7.8        13       333       100
IR     2025130    131400  -12.0900 -133.6700       7.6       356       390        99
IR     2025130    131400  -12.1100 -133.7100       8.0       351       395        99
IR     2025130    131400  -12.0900 -133.8600      11.4        10       319        99
IR     2025130    131400  -12.1200 -133.9300      11.5        15       315       100
IR     2025130    131400  -12.0900 -134.0100      11.6        18       318       100
IR     2025130    131400  -12.1400 -134.4200       8.9        15       323        99
IR     2025130    131400  -12.1200 -134.4400       8.7        15       322       100
IR     2025130    131400  -12.0800 -134.5300       8.5        13       321        98
IR     2025130    131400  -12.0600 -134.6600       7.6         6       331        91
IR     2025130    131400  -12.1400 -134.7700       9.2        14       350        98
IR     2025130    131400  -12.1200 -134.8100       9.3        15       329        99
IR     2025130    131400  -12.1000 -136.0000       8.9       345       213        94
IR     2025130    131400  -12.0600 -136.0900       7.1       341       208        96
IR     2025130    131400  -12.1300 -136.1600      10.3       342       209        99
IR     2025130    131400  -12.0600 -136.2800       4.7       331       221        91
IR     2025130    131400  -12.1300 -136.6300       6.5       358       213        98
IR     2025130    131400  -12.1300 -136.6800       6.1         5       210        94
IR     2025130    131400  -12.0900 -136.7900      10.3       350       208        89
IR     2025130    131400  -12.1100 -136.8900      11.3       345       207        85
IR     2025130    131400  -12.1100 -137.0200      13.6       340       203       100
IR     2025130    131400  -12.1300 -137.0300      13.1       342       204        96
IR     2025130    131400  -12.0500 -137.1800      13.6       336       192        97
IR     2025130    131400  -12.0500 -137.2800      14.4       333       192        94
IR     2025130    131400  -12.0700 -137.3100      15.6       326       196        84
IR     2025130    131400  -12.0900 -137.4200      15.1       326       197        86
IR     2025130    131400  -12.0700 -137.6600       7.0       318       191        81
IR     2025130    131400  -12.1100 -137.6800       5.1       319       192        91
IR     2025130    131400  -12.0500 -137.8500       4.7       103       189        66
IR     2025130    131400  -12.0900 -137.9400       6.8       111       190        98
IR     2025130    131400  -12.0500 -138.0300       5.9       118       189        98
IR     2025130    131400  -12.1300 -138.0700       5.7       108       196        83
IR     2025130    131400  -12.0700 -138.2200       4.0        95       189        93
IR     2025130    131400  -12.0700 -138.2900       6.5        89       191        99
IR     2025130    131400  -12.0500 -138.4000       5.3        89       192        99
IR     2025130    131400  -12.0700 -138.4400       5.8        89       197        99
IR     2025130    131400  -12.0700 -138.6800       6.2       356       202        60
IR     2025130    131400  -12.0700 -138.7200       7.1       354       202        60
IR     2025130    131400  -12.0900 -138.9800       6.9       306       206        80
IR     2025130    131400  -12.1300 -139.1400       5.5       334       205        61
IR     2025130    131400  -12.1300 -139.1600       5.8       343       205        65
IR     2025130    131400  -12.1200 -139.3100      10.6         4       207        96
IR     2025130    131400  -12.1100 -139.3800      11.1       357       210        97
IR     2025130    131400  -12.0700 -139.4900      11.9       348       267       100
IR     2025130    131400  -12.1200 -139.5800      12.6       344       279       100
IR     2025130    131400  -12.1200 -139.6600      12.7       348       297        99
IR     2025130    131400  -12.1200 -139.7300      12.5       344       297       100
IR     2025130    131400  -12.1200 -139.9700      10.2       346       297        98
IR     2025130    131400  -12.0500 -140.1200       7.9       345       241        86
IR     2025130    131400  -12.0700 -140.2300       7.4       348       242        94
IR     2025130    131400  -12.0900 -140.2700       7.5       350       243        98
IR     2025130    131400  -12.0500 -140.5100       7.5       349       325        96
IR     2025130    131400  -12.1200 -140.6200       6.2       337       328        72
IR     2025130    131400  -12.0900 -140.7600       7.2       340       326        99
IR     2025130    131400  -12.1100 -140.7800       7.4       343       326        99
IR     2025130    131400  -12.1100 -140.8800       8.7       357       326        99
IR     2025130    131400  -12.0900 -141.1100       7.1         5       374        98
IR     2025130    131400  -12.0700 -141.2300       5.4        16       367        92
IR     2025130    131400  -12.2400 -132.8600       6.9         3       185        98
IR     2025130    131400  -12.2200 -132.9600       7.4         3       198       100
IR     2025130    131400  -12.1700 -133.0900       7.9         7       204        95
IR     2025130    131400  -12.1600 -133.1800       7.9         8       231       100
IR     2025130    131400  -12.2200 -133.2800       8.1        11       252       100
IR     2025130    131400  -12.1800 -133.4100       8.5        16       223        82
IR     2025130    131400  -12.2400 -133.5200       6.7       354       396        87
IR     2025130    131400  -12.1800 -133.6700       8.2       344       412        96
IR     2025130    131400  -12.2400 -133.7200       9.7       353       392        88
IR     2025130    131400  -12.2400 -134.0200      10.6        20       322        99
IR     2025130    131400  -12.2300 -134.1200       9.9        20       225        99
IR     2025130    131400  -12.2300 -134.1400       9.8        20       229        99
IR     2025130    131400  -12.2300 -134.2500       9.3        13       324       100
IR     2025130    131400  -12.1600 -134.4000       9.1        15       324        99
IR     2025130    131400  -12.1600 -134.4400       9.4        16       325       100
IR     2025130    131400  -12.2100 -134.5600      10.7        16       398       100
IR     2025130    131400  -12.2100 -134.6800      10.7        15       406        97
IR     2025130    131400  -12.1800 -134.7300       9.7        14       397        98
IR     2025130    131400  -12.1900 -134.8100      10.6        13       362       100
IR     2025130    131400  -12.1700 -134.8800      12.3        20       334        98
IR     2025130    131400  -12.2300 -135.0100      12.6        15       306        98
IR     2025130    131400  -12.2300 -136.1800      12.5       345       216        99
IR     2025130    131400  -12.2300 -136.2500      10.1       344       229        99
IR     2025130    131400  -12.2300 -136.2900       9.0       343       246        98
IR     2025130    131400  -12.1500 -136.5500       5.9       353       259        99
IR     2025130    131400  -12.2200 -136.8100       7.5       358       210        89
IR     2025130    131400  -12.2200 -136.9400      10.3       349       207        93
IR     2025130    131400  -12.1900 -137.0300      12.4       345       205       100
IR     2025130    131400  -12.1900 -137.1600      14.0       336       203       100
IR     2025130    131400  -12.1900 -137.1800      14.3       335       203       100
IR     2025130    131400  -12.2200 -137.3100      16.2       323       207        92
IR     2025130    131400  -12.2200 -137.3700      15.7       324       208        89
IR     2025130    131400  -12.1700 -137.4800      14.5       319       201        62
IR     2025130    131400  -12.1500 -138.0900       4.8       103       198        68
IR     2025130    131400  -12.1500 -138.3700       9.4        88       208        83
IR     2025130    131400  -12.1400 -138.4600       7.4        89       208        70
IR     2025130    131400  -12.1800 -138.5100       6.2        89       213        67
IR     2025130    131400  -12.1400 -138.9200       6.0       341       210        76
IR     2025130    131400  -12.1400 -138.9400       6.0       328       210        91
IR     2025130    131400  -12.2200 -139.0500       6.4       338       213        83
IR     2025130    131400  -12.2200 -139.2000       8.9       360       211        81
IR     2025130    131400  -12.2000 -139.2900      11.0       359       208        99
IR     2025130    131400  -12.1600 -139.3800      11.9       351       233        97
IR     2025130    131400  -12.1800 -139.6400      12.4       343       289       100
IR     2025130    131400  -12.1800 -139.6600      12.5       342       296       100
IR     2025130    131400  -12.1400 -139.7700      12.4       342       297        98
IR     2025130    131400  -12.1400 -140.0300       9.9       344       243        91
IR     2025130    131400  -12.2200 -140.1700       7.6       346       240        99
IR     2025130    131400  -12.1600 -140.2700       7.0       348       240        89
IR     2025130    131400  -12.1800 -140.3400       6.2       351       312        78
IR     2025130    131400  -12.2200 -140.5800       7.3       341       329        83
IR     2025130    131400  -12.1600 -140.6700       6.9       341       327        85
IR     2025130    131400  -12.1800 -140.7600       7.0       347       329        98
IR     2025130    131400  -12.1400 -140.8600       8.1       358       329        99
IR     2025130    131400  -12.1800 -140.9700       8.9         9       393        98
IR     2025130    131400  -12.1400 -141.0200       8.8         9       383        99
IR     2025130    131400  -12.1400 -141.1200       7.9         5       376       100
IR     2025130    131400  -12.1600 -141.2600       6.8        12       378        92
IR     2025130    131400  -12.1800 -141.2800       7.0        11       379        86
SWIR   2025130    131400   -4.3700 -140.7100       6.1       350       754        72
SWIR   2025130    131400   -4.3700 -140.7500       6.5       351       763        70
SWIR   2025130    131400   -4.8400 -133.1000       4.0       222       896        77
SWIR   2025130    131400   -5.2800 -133.3500       4.3       209       921        92
SWIR   2025130    131400   -5.2400 -133.3700       4.3       214       904        91
SWIR   2025130    131400   -5.2200 -133.4800       4.4       221       872        79
SWIR   2025130    131400   -5.2900 -133.3300       4.4       207       926        87
SWIR   2025130    131400   -5.3100 -133.4400       4.5       212       897        94
SWIR   2025130    131400   -5.3700 -133.5300       4.2       211       872        76
SWIR   2025130    131400   -5.3800 -133.3100       4.8       189       937        87
SWIR   2025130    131400   -5.3800 -133.4400       4.8       205       889        98
SWIR   2025130    131400   -5.8200 -133.7200       4.6       196       932        99
SWIR   2025130    131400   -5.8800 -133.0600       8.1       168       877        79
SWIR   2025130    131400   -5.9000 -133.0800       7.8       167       876        79
SWIR   2025130    131400   -5.8400 -133.7000       4.4       199       932        95
SWIR   2025130    131400   -5.8900 -133.7400       5.4       185       932        97
SWIR   2025130    131400   -5.8800 -133.8300       6.8       175       940        96
SWIR   2025130    131400   -5.8900 -133.9800       6.1       203       835       100
SWIR   2025130    131400   -5.8900 -134.0500       5.9       204       843       100
SWIR   2025130    131400   -5.9100 -134.1200       6.4       212       837        95
SWIR   2025130    131400   -5.9500 -133.0100       6.4       169       866        79
SWIR   2025130    131400   -5.9500 -133.4800       4.0       150       945        76
SWIR   2025130    131400   -5.9300 -133.9800       6.2       200       846       100
SWIR   2025130    131400   -5.9500 -134.0300       6.1       201       849       100
SWIR   2025130    131400   -5.9700 -134.1000       6.6       207       841        96
SWIR   2025130    131400   -6.0200 -133.9400       5.8       189       909        99
SWIR   2025130    131400   -6.0600 -134.0100       5.8       185       913       100
SWIR   2025130    131400   -6.0900 -134.1000       7.0       194       851        94
SWIR   2025130    131400   -6.2800 -132.8400       9.1       177       876        99
SWIR   2025130    131400   -6.3000 -132.8000       8.7       177       879        99
SWIR   2025130    131400   -6.3700 -133.2900       6.7       172       895        99
SWIR   2025130    131400   -6.4100 -133.2700       6.7       171       880        99
SWIR   2025130    131400   -6.4300 -133.3800       5.0       163       920        91
SWIR   2025130    131400   -6.4600 -133.5100       6.2       173       833        93
SWIR   2025130    131400   -6.4600 -133.6900       4.6       192       750        98
SWIR   2025130    131400   -6.4600 -133.8000       4.8       173       893        98
SWIR   2025130    131400   -6.4400 -133.9500       5.0       195       902        95
SWIR   2025130    131400   -6.4200 -134.0100       5.5       202       883        98
SWIR   2025130    131400   -6.4400 -134.0800       5.7       197       866        73
SWIR   2025130    131400   -6.5400 -133.5500       5.9       181       774        97
SWIR   2025130    131400   -6.5200 -133.6600       5.0       198       746        96
SWIR   2025130    131400   -6.5000 -133.7100       4.5       192       779        97
SWIR   2025130    131400   -6.5500 -133.8800       5.4       164       919        84
SWIR   2025130    131400   -6.5500 -133.8900       5.2       166       919        84
SWIR   2025130    131400   -6.5500 -133.9900       5.2       197       885        90
SWIR   2025130    131400   -6.6400 -133.6200       4.8       192       762        98
SWIR   2025130    131400   -6.6400 -133.7100       5.7       188       801        99
SWIR   2025130    131400   -6.5700 -133.8800       5.4       160       914        90
SWIR   2025130    131400   -6.5700 -133.9100       5.1       164       926        90
SWIR   2025130    131400   -6.6600 -133.6400       4.9       190       767        99
SWIR   2025130    131400   -6.7400 -133.7100       6.0       180       797        94
SWIR   2025130    131400   -6.7400 -133.8000       6.9       174       813        95
SWIR   2025130    131400   -6.7400 -133.8900       7.7       169       852        98
SWIR   2025130    131400   -6.7700 -133.6900       5.9       177       802        96
SWIR   2025130    131400   -6.7900 -133.7100       6.5       174       806        92
SWIR   2025130    131400   -6.7500 -133.8400       7.5       171       829        96
SWIR   2025130    131400   -6.7900 -133.8900       7.6       170       835        94
SWIR   2025130    131400   -6.9000 -133.6100       6.3       184       808        91
SWIR   2025130    131400   -6.9200 -133.7400       5.1       183       802        97
SWIR   2025130    131400   -6.9000 -133.8300       4.7       185       810        94
SWIR   2025130    131400   -7.0100 -133.6900       4.8       188       788        89
SWIR   2025130    131400   -6.9900 -133.7200       4.4       186       784        94
SWIR   2025130    131400   -7.1000 -133.5500       5.4       188       808        95
SWIR   2025130    131400   -7.0300 -133.6800       4.7       189       785        88
SWIR   2025130    131400   -7.0500 -133.7000       4.2       192       774        85
SWIR   2025130    131400   -7.1900 -133.5700       5.5       191       785        98
SWIR   2025130    131400   -7.1400 -133.6100       5.4       199       793        87
SWIR   2025130    131400   -7.1900 -133.7000       5.8       200       759        69
SWIR   2025130    131400   -7.2700 -133.5500       5.3       183       770        99
SWIR   2025130    131400   -7.2100 -133.6800       5.8       199       746        72
SWIR   2025130    131400   -7.4800 -140.8500      11.4       337       737        98
SWIR   2025130    131400   -7.6000 -140.8200      10.4       354       723        75
SWIR   2025130    131400   -7.7200 -134.4200       8.2       179       739        93
SWIR   2025130    131400   -7.6900 -134.5200       7.5       181       710        98
SWIR   2025130    131400   -7.6700 -134.6500       8.2       170       764        98
SWIR   2025130    131400   -7.6700 -134.7200      10.2       159       776        98
SWIR   2025130    131400   -7.7000 -134.8600       9.1       168       798        88
SWIR   2025130    131400   -7.7200 -134.9200       8.9       187       791        96
SWIR   2025130    131400   -7.6600 -138.7700       9.8       353       856        96
SWIR   2025130    131400   -7.6800 -138.8400       9.6       354       863        97
SWIR   2025130    131400   -7.8200 -134.2000       7.1       162       839        93
SWIR   2025130    131400   -7.7800 -134.3100       7.9       169       803        93
SWIR   2025130    131400   -7.8000 -134.3300       8.2       171       804        93
SWIR   2025130    131400   -7.7800 -134.4800       8.0       184       749        98
SWIR   2025130    131400   -7.7800 -134.5500       7.8       181       749        99
SWIR   2025130    131400   -7.7800 -134.6600       8.8       169       806       100
SWIR   2025130    131400   -7.8000 -134.7700       9.5       160       816        99
SWIR   2025130    131400   -7.8000 -134.8400       8.6       166       804        99
SWIR   2025130    131400   -7.8300 -138.6700      12.1       351       866        99
SWIR   2025130    131400   -7.7900 -138.7300      11.9       350       863        93
SWIR   2025130    131400   -7.7500 -138.8200      10.8       352       867        88
SWIR   2025130    131400   -7.9100 -134.2200       9.0       166       853        96
SWIR   2025130    131400   -7.8700 -134.3100       8.5       171       839        98
SWIR   2025130    131400   -7.8700 -134.3900       9.3       175       830        98
SWIR   2025130    131400   -7.8500 -134.4200       9.0       178       800        97
SWIR   2025130    131400   -7.8500 -134.5300       8.4       176       809        99
SWIR   2025130    131400   -7.9100 -134.6400      10.1       160       842       100
SWIR   2025130    131400   -7.8900 -134.7700       8.2       169       841        95
SWIR   2025130    131400   -7.8900 -134.8400       7.5       181       790        96
SWIR   2025130    131400   -7.9700 -133.8500       8.9       159       855        63
SWIR   2025130    131400   -7.9800 -133.9200       9.2       166       870        63
SWIR   2025130    131400   -7.9800 -133.9600       9.1       170       876        73
SWIR   2025130    131400   -7.9800 -134.2200       9.1       168       866       100
SWIR   2025130    131400   -8.0000 -134.2400       9.1       172       855       100
SWIR   2025130    131400   -7.9600 -134.3300       9.1       172       854       100
SWIR   2025130    131400   -8.0200 -134.4900      10.7       155       850        91
SWIR   2025130    131400   -7.9400 -134.5900      10.5       157       850        99
SWIR   2025130    131400   -7.9400 -134.6000      10.5       157       850        99
SWIR   2025130    131400   -8.0800 -133.8900       8.8       168       878        89
SWIR   2025130    131400   -8.0800 -133.9800       8.8       170       885        97
SWIR   2025130    131400   -8.1100 -134.1200      11.2       156       883        94
SWIR   2025130    131400   -8.0900 -134.1600      12.0       151       881        95
SWIR   2025130    131400   -8.0900 -134.3100      13.2       150       887        93
SWIR   2025130    131400   -8.1100 -134.3300      13.4       150       908        83
SWIR   2025130    131400   -8.1100 -134.4900      10.9       153       909        74
SWIR   2025130    131400   -8.0900 -134.5300       9.9       158       896        90
SWIR   2025130    131400   -8.0400 -134.6200      10.8       156       849        96
SWIR   2025130    131400   -8.2000 -133.9000       9.6       162       872       100
SWIR   2025130    131400   -8.2000 -134.0300      10.2       161       872        95
SWIR   2025130    131400   -8.2000 -134.0700      10.2       161       868        92
SWIR   2025130    131400   -8.1700 -134.2100      12.9       149       882        97
SWIR   2025130    131400   -8.1500 -134.2500      15.0       147       872        96
SWIR   2025130    131400   -8.1300 -134.3800      12.4       150       911        86
SWIR   2025130    131400   -8.1700 -134.4500      11.6       152       908        70
SWIR   2025130    131400   -8.1300 -134.5100      10.7       155       899        75
SWIR   2025130    131400   -8.1800 -134.6700       7.3       173       864        89
SWIR   2025130    131400   -8.2000 -134.6900       6.7       171       738        74
SWIR   2025130    131400   -8.3000 -133.8300       9.8       166       839        99
SWIR   2025130    131400   -8.2200 -133.8600       9.3       162       868       100
SWIR   2025130    131400   -8.2600 -133.9600       9.1       165       839       100
SWIR   2025130    131400   -8.3000 -134.0500       8.6       164       847        99
SWIR   2025130    131400   -8.2600 -134.1900      11.6       154       883        94
SWIR   2025130    131400   -8.2400 -134.2300      13.4       150       888        94
SWIR   2025130    131400   -8.2600 -134.6200       9.0       161       914        95
SWIR   2025130    131400   -8.2200 -134.6700       7.2       172       878        87
SWIR   2025130    131400   -8.2800 -139.4200      11.8        27       752        82
SWIR   2025130    131400   -8.2800 -139.4700      11.2        19       734        76
SWIR   2025130    131400   -8.3500 -133.7100       6.6       171       847        96
SWIR   2025130    131400   -8.3200 -133.8100       9.2       168       845       100
SWIR   2025130    131400   -8.3500 -133.8600       8.5       166       835        99
SWIR   2025130    131400   -8.3100 -133.9500       8.8       163       839        99
SWIR   2025130    131400   -8.3300 -134.1200       8.5       168       853        98
SWIR   2025130    131400   -8.3100 -134.1600       9.7       163       867        99
SWIR   2025130    131400   -8.3100 -134.2900      16.2       141       871        90
SWIR   2025130    131400   -8.3200 -139.3100      12.5        25       734        98
SWIR   2025130    131400   -8.3600 -139.4400      11.8        20       718        99
SWIR   2025130    131400   -8.3800 -139.4500      11.6        16       710        99
SWIR   2025130    131400   -8.4800 -133.8000       6.3       171       830       100
SWIR   2025130    131400   -8.4800 -133.8600       5.4       175       817       100
SWIR   2025130    131400   -8.4300 -133.9500       6.1       168       835        99
SWIR   2025130    131400   -8.4700 -139.3600      13.8        20       718        86
SWIR   2025130    131400   -8.5000 -133.8200       6.4       170       817       100
SWIR   2025130    131400   -8.5000 -133.8800       5.0       173       817       100
SWIR   2025130    131400   -8.5200 -134.0100       5.5       163       835        98
SWIR   2025130    131400   -8.5100 -139.3300      14.2        21       763        87
SWIR   2025130    131400   -8.6300 -133.7500      13.3       155       867        98
SWIR   2025130    131400   -8.6100 -133.8000      11.2       157       867       100
SWIR   2025130    131400   -8.6300 -133.8900       7.6       153       872        94
SWIR   2025130    131400   -8.7400 -133.8700       5.8       135       880        73
SWIR   2025130    131400   -8.7200 -133.9500       7.1       143       843        79
SWIR   2025130    131400   -8.8100 -133.8500       5.1       111       853        77
SWIR   2025130    131400   -8.8100 -133.9800       7.0       143       841        88
SWIR   2025130    131400   -8.9000 -133.8500       7.3       151       860        96
SWIR   2025130    131400   -8.9300 -139.3200      11.9        89       833        95
SWIR   2025130    131400   -8.8900 -139.4200      12.8        92       864        60
SWIR   2025130    131400   -9.0000 -133.8100       9.2       156       835        86
SWIR   2025130    131400   -9.0200 -133.8500       9.9       159       835        88
SWIR   2025130    131400   -9.0300 -134.1600       5.3       174       830        96
SWIR   2025130    131400   -8.9700 -139.3400      11.5        89       835        92
SWIR   2025130    131400   -8.9700 -139.3800      11.3        91       859        73
SWIR   2025130    131400   -9.0500 -134.1000       5.1       166       830        98
SWIR   2025130    131400   -9.0700 -134.1200       5.1       161       832        96
SWIR   2025130    131400   -9.0400 -139.2900       9.3        79       827        61
SWIR   2025130    131400   -9.0900 -139.4700      14.3        91       806        85
SWIR   2025130    131400   -9.1600 -134.1900       7.0       157       870        66
SWIR   2025130    131400   -9.4800 -140.0000      14.5        99       877        99
SWIR   2025130    131400   -9.5400 -140.0200      15.4        98       883       100
SWIR   2025130    131400   -9.6500 -140.0100      17.6        99       889        96
SWIR   2025130    131400   -9.8000 -139.4800      12.0        97       902        71
SWIR   2025130    131400   -9.8700 -139.4700      15.2        98       910        96
SWIR   2025130    131400   -9.9100 -139.5600      13.3        97       904        97
SWIR   2025130    131400   -9.9600 -139.5600      14.2        97       906        97
SWIR   2025130    131400  -10.2800 -140.7300      10.8       357       733        82
SWIR   2025130    131400  -10.3700 -140.7300       6.5        41       741        79
SWIR   2025130    131400  -10.3900 -140.8000       6.6        23       710        85
SWIR   2025130    131400  -10.4300 -140.7300       7.7        85       760        85
SWIR   2025130    131400  -10.4600 -140.8400       7.4        34       717        71
SWIR   2025130    131400  -10.5200 -140.8600       7.4        31       723        68
SWIR   2025130    131400  -10.6700 -140.7100       8.4        56       738        76
SWIR   2025130    131400  -10.7600 -140.7800       7.5        19       701        92
SWIR   2025130    131400  -10.8200 -141.0600       9.4       348       703        87
SWIR   2025130    131400  -10.8400 -141.0800       9.0       347       714        84
SWIR   2025130    131400  -10.9300 -140.9800       8.9       342       710        98
WVCT   2025130    131400   -3.8700 -132.9100       6.3        87       193        70
WVCT   2025130    131400   -3.8900 -132.9200       6.8        91       194        71
WVCT   2025130    131400   -3.8400 -133.1300       8.1       102       169        94
WVCT   2025130    131400   -3.9100 -133.8400       4.3        97       235        91
WVCT   2025130    131400   -3.8900 -133.8700       4.7        91       242        84
WVCT   2025130    131400   -3.8700 -134.3800       5.5       182       225        74
WVCT   2025130    131400   -3.8900 -134.6700       4.8       105       203        83
WVCT   2025130    131400   -3.8300 -134.7100       4.0        99       201        86
WVCT   2025130    131400   -3.8900 -134.9300       4.7       126       197        70
WVCT   2025130    131400   -3.8900 -134.9800       4.3       142       223        65
WVCT   2025130    131400   -3.9100 -135.7300       6.1        65       221        74
WVCT   2025130    131400   -3.8500 -135.8900       4.8        34       222        85
WVCT   2025130    131400   -3.9100 -135.9800       4.0        78       220        95
WVCT   2025130    131400   -3.9000 -136.6000       4.7        95       241        95
WVCT   2025130    131400   -3.8300 -136.7600       5.5        97       214        89
WVCT   2025130    131400   -3.8300 -137.0700       7.2       128       204        67
WVCT   2025130    131400   -3.8500 -137.0800       7.3       128       203        66
WVCT   2025130    131400   -3.9000 -137.3900       7.4       139       198        83
WVCT   2025130    131400   -3.8300 -137.5000       9.4       128       198        76
WVCT   2025130    131400   -3.8300 -137.5500      10.8       129       203        68
WVCT   2025130    131400   -3.8300 -137.6600      11.3       124       199        66
WVCT   2025130    131400   -3.8900 -137.7900       8.7       114       193        74
WVCT   2025130    131400   -3.8900 -137.8100       8.1       112       193        76
WVCT   2025130    131400   -3.9000 -137.9700       7.8       126       196        73
WVCT   2025130    131400   -3.9000 -138.1700      11.8       124       196        64
WVCT   2025130    131400   -3.8300 -138.2900      12.0       131       200        62
WVCT   2025130    131400   -3.8500 -138.4200       9.3       144       201        62
WVCT   2025130    131400   -3.8500 -138.5100      10.1       147       200        61
WVCT   2025130    131400   -3.8900 -138.5300       9.3       137       200        70
WVCT   2025130    131400   -3.8700 -139.8100       7.5       120       210        99
WVCT   2025130    131400   -3.8300 -139.9200       9.3       117       213        96
WVCT   2025130    131400   -3.8300 -139.9900      10.0       121       213        92
WVCT   2025130    131400   -3.9300 -132.9400       7.6        99       196        77
WVCT   2025130    131400   -3.9600 -133.0300       9.5       101       189        67
WVCT   2025130    131400   -4.0000 -133.3300       4.5        85       172        61
WVCT   2025130    131400   -3.9300 -134.3300       4.5       186       226        66
WVCT   2025130    131400   -4.0000 -134.4900       4.3       134       199        89
WVCT   2025130    131400   -3.9800 -134.5300       4.8       122       203        94
WVCT   2025130    131400   -3.9800 -134.6200       6.6       113       203        93
WVCT   2025130    131400   -4.0000 -134.9500       4.7       126       189        80
WVCT   2025130    131400   -3.9600 -135.6700       4.9        93       220        66
WVCT   2025130    131400   -3.9600 -135.7600       7.6        87       221        83
WVCT   2025130    131400   -3.9600 -135.8200       7.4        85       223        83
WVCT   2025130    131400   -3.9400 -135.9100       4.9        69       223        74
WVCT   2025130    131400   -4.0000 -136.6100       4.7        61       240        84
WVCT   2025130    131400   -3.9400 -136.6300       4.3        71       240        69
WVCT   2025130    131400   -4.0000 -136.8800       4.4        23       220        76
WVCT   2025130    131400   -4.0000 -136.9000       4.8        14       217        73
WVCT   2025130    131400   -3.9400 -137.4100       4.9       142       198        89
WVCT   2025130    131400   -3.9200 -137.7900       8.2       125       185        69
WVCT   2025130    131400   -3.9200 -137.8200       7.6       125       192        66
WVCT   2025130    131400   -3.9400 -137.9000       7.9       122       192        65
WVCT   2025130    131400   -3.9900 -137.9900       8.8       125       188        77
WVCT   2025130    131400   -3.9900 -138.1300      10.4       126       205        69
WVCT   2025130    131400   -3.9800 -138.1700      10.7       123       195        70
WVCT   2025130    131400   -3.9900 -138.2900       8.1       125       195        88
WVCT   2025130    131400   -3.9800 -138.3800       5.9       141       218        90
WVCT   2025130    131400   -3.9200 -138.5100       7.0       132       202        90
WVCT   2025130    131400   -3.9900 -138.9100       6.9       138       200        61
WVCT   2025130    131400   -3.9200 -139.8600      10.0       129       211        83
WVCT   2025130    131400   -3.9200 -140.0200      12.9       122       213        84
WVCT   2025130    131400   -4.0200 -132.9000       5.0       118       190        97
WVCT   2025130    131400   -4.0200 -132.9200       5.9       116       191        94
WVCT   2025130    131400   -4.0400 -133.0100       7.8       111       190        70
WVCT   2025130    131400   -4.0700 -133.1100       6.6        89       193        64
WVCT   2025130    131400   -4.0400 -133.3100       4.9        83       174        98
WVCT   2025130    131400   -4.0900 -133.3800       6.5       106       176        92
WVCT   2025130    131400   -4.0700 -134.4900       7.0       118       199        96
WVCT   2025130    131400   -4.0900 -134.5500       8.2       113       202        95
WVCT   2025130    131400   -4.0200 -134.6000       8.0       113       202        96
WVCT   2025130    131400   -4.0200 -134.9500       4.2       128       189        88
WVCT   2025130    131400   -4.0900 -135.1400       4.1       353       257        70
WVCT   2025130    131400   -4.0500 -135.7600       6.8       113       225        78
WVCT   2025130    131400   -4.0900 -135.8200       7.4       113       226        72
WVCT   2025130    131400   -4.0700 -135.9100       6.1       108       223        83
WVCT   2025130    131400   -4.0100 -136.6100       5.1        59       239        87
WVCT   2025130    131400   -4.0900 -136.7400       5.0       340       221        62
WVCT   2025130    131400   -4.0500 -136.9200       6.6        37       220        86
WVCT   2025130    131400   -4.0700 -136.9400       8.4        53       221        89
WVCT   2025130    131400   -4.0100 -137.5500       5.3       161       195        81
WVCT   2025130    131400   -4.0100 -137.8800       8.3       129       183        61
WVCT   2025130    131400   -4.0100 -137.9700       8.9       124       187        73
WVCT   2025130    131400   -4.0700 -138.0200       9.7       120       189        71
WVCT   2025130    131400   -4.0100 -138.1100      10.5       126       205        69
WVCT   2025130    131400   -4.0500 -138.2000      12.9       126       209        62
WVCT   2025130    131400   -4.0500 -138.3500       6.2       133       215        97
WVCT   2025130    131400   -4.0500 -138.4200       5.8       147       221        99
WVCT   2025130    131400   -4.0800 -138.4700       4.7       157       221        95
WVCT   2025130    131400   -4.0300 -138.8900       6.4       144       201        79
WVCT   2025130    131400   -4.0500 -138.9600       7.8       123       199        66
WVCT   2025130    131400   -4.0700 -139.0500       7.5       131       198        95
WVCT   2025130    131400   -4.0800 -139.6600       7.1       133       204        80
WVCT   2025130    131400   -4.0100 -140.0100      12.3       119       211        91
WVCT   2025130    131400   -4.1300 -132.9800       5.7       114       182        61
WVCT   2025130    131400   -4.1600 -133.0700       5.2        97       185        78
WVCT   2025130    131400   -4.1800 -133.1800       6.2        76       185        88
WVCT   2025130    131400   -4.1500 -133.2700       6.3        80       178        68
WVCT   2025130    131400   -4.1100 -133.3400      10.1       120       174        60
WVCT   2025130    131400   -4.1100 -133.3800      10.5       121       178        62
WVCT   2025130    131400   -4.1800 -133.5400       4.9        69       225        86
WVCT   2025130    131400   -4.1800 -133.5600       4.5        67       225        82
WVCT   2025130    131400   -4.1100 -134.4700       6.7       114       206        98
WVCT   2025130    131400   -4.1100 -134.5100       7.5       113       201        98
WVCT   2025130    131400   -4.1100 -135.1600       4.3       349       257        68
WVCT   2025130    131400   -4.1100 -135.6300       5.2       159       215        82
WVCT   2025130    131400   -4.1100 -135.7300       6.6       136       219        82
WVCT   2025130    131400   -4.1200 -135.8200       7.8       121       225        67
WVCT   2025130    131400   -4.1100 -135.8300       7.7       115       226        76
WVCT   2025130    131400   -4.1000 -136.5800       4.0        88       239        77
WVCT   2025130    131400   -4.1800 -137.5500       5.2       161       193        99
WVCT   2025130    131400   -4.1800 -137.6800       9.3       127       204        65
WVCT   2025130    131400   -4.1000 -137.7700       6.7       126       195        63
WVCT   2025130    131400   -4.1200 -137.8600       4.8       125       185        83
WVCT   2025130    131400   -4.1800 -137.9000       5.6       126       186        89
WVCT   2025130    131400   -4.1800 -138.0800       8.8       124       190        65
WVCT   2025130    131400   -4.1000 -138.1700      11.8       133       213        64
WVCT   2025130    131400   -4.1400 -138.2700      11.2       140       209        63
WVCT   2025130    131400   -4.1800 -138.4000       6.5       158       214        98
WVCT   2025130    131400   -4.1200 -138.4700       4.2       158       217        97
WVCT   2025130    131400   -4.1800 -138.5300       4.2       123       207        78
WVCT   2025130    131400   -4.1800 -138.7800       7.1       145       207        76
WVCT   2025130    131400   -4.1800 -138.8700       7.5       140       207        74
WVCT   2025130    131400   -4.1000 -138.9800       7.7       116       202        96
WVCT   2025130    131400   -4.1400 -139.1900       5.9       160       203        76
WVCT   2025130    131400   -4.1000 -139.6500       6.0       120       203        72
WVCT   2025130    131400   -4.2400 -132.8300       9.7       103       208        72
WVCT   2025130    131400   -4.2700 -132.9200      10.1       105       198        86
WVCT   2025130    131400   -4.2000 -133.0500       7.5        97       189        97
WVCT   2025130    131400   -4.2400 -133.1000       6.8        92       186        90
WVCT   2025130    131400   -4.2000 -133.2000       6.3        78       179        91
WVCT   2025130    131400   -4.2700 -133.3000       5.1       103       174        99
WVCT   2025130    131400   -4.2000 -133.3800       5.9       102       181        70
WVCT   2025130    131400   -4.2000 -136.9000      20.4       104       224        60
WVCT   2025130    131400   -4.1900 -137.5700       5.9       156       194        97
WVCT   2025130    131400   -4.2300 -137.6100       8.5       142       196        81
WVCT   2025130    131400   -4.2700 -137.7500       8.3       136       214        71
WVCT   2025130    131400   -4.2700 -137.8100       6.1       138       211        79
WVCT   2025130    131400   -4.2100 -137.9000       5.2       128       187        85
WVCT   2025130    131400   -4.2500 -137.9900       6.9       121       185        89
WVCT   2025130    131400   -4.1900 -138.0900       7.4       121       192        70
WVCT   2025130    131400   -4.2700 -138.1700       5.5       128       201        96
WVCT   2025130    131400   -4.1900 -138.2400       9.1       140       208        75
WVCT   2025130    131400   -4.2700 -138.4000       6.3       157       213        99
WVCT   2025130    131400   -4.2700 -138.4200       6.0       154       213       100
WVCT   2025130    131400   -4.2300 -138.5300       4.0       117       207        91
WVCT   2025130    131400   -4.2500 -138.6700       6.2       133       206        70
WVCT   2025130    131400   -4.2700 -138.7100       7.0       134       202        66
WVCT   2025130    131400   -4.2700 -138.8500       5.4       139       205        97
WVCT   2025130    131400   -4.2700 -138.8700       5.1       143       205        91
WVCT   2025130    131400   -4.2700 -138.9600       4.0       160       204        92
WVCT   2025130    131400   -4.2700 -139.0900       4.3       145       197        76
WVCT   2025130    131400   -4.2300 -139.1900       6.3       150       207        94
WVCT   2025130    131400   -4.2300 -139.2300       7.3       155       208        89
WVCT   2025130    131400   -4.2900 -132.9000      10.0       106       201        89
WVCT   2025130    131400   -4.3600 -132.9400       9.1       108       198        96
WVCT   2025130    131400   -4.3500 -133.0300       9.6       110       201        94
WVCT   2025130    131400   -4.3300 -133.1800       7.4       109       182        66
WVCT   2025130    131400   -4.3500 -133.1900       6.9       106       181        69
WVCT   2025130    131400   -4.3600 -133.6100       4.4       127       220        86
WVCT   2025130    131400   -4.3600 -134.8300       5.1       145       208        72
WVCT   2025130    131400   -4.3600 -134.8500       5.0       140       207        74
WVCT   2025130    131400   -4.2900 -135.9400       5.8       188       220        64
WVCT   2025130    131400   -4.3600 -136.8800      11.8        97       238        65
WVCT   2025130    131400   -4.3400 -137.2300       9.0       101       228        84
WVCT   2025130    131400   -4.3600 -137.2600       9.4       108       229        88
WVCT   2025130    131400   -4.3400 -137.6100      12.4       146       207        62
WVCT   2025130    131400   -4.3600 -137.6200      12.4       146       223        63
WVCT   2025130    131400   -4.3200 -137.7300      10.3       142       221        64
WVCT   2025130    131400   -4.2900 -137.8200       5.3       143       213        83
WVCT   2025130    131400   -4.3000 -137.9700       6.4       125       186        95
WVCT   2025130    131400   -4.3200 -138.0000       6.4       128       187        97
WVCT   2025130    131400   -4.2800 -138.1500       5.5       129       200        97
WVCT   2025130    131400   -4.3400 -138.1800       4.8       119       202        95
WVCT   2025130    131400   -4.3200 -138.3300       4.5       146       208        94
WVCT   2025130    131400   -4.2800 -138.3800       6.1       158       211        99
WVCT   2025130    131400   -4.3200 -138.5100       6.4       136       208        94
WVCT   2025130    131400   -4.3600 -138.5600       6.0       145       208        98
WVCT   2025130    131400   -4.3000 -138.6500       5.5       139       202        85
WVCT   2025130    131400   -4.2800 -138.7100       6.7       135       201        77
WVCT   2025130    131400   -4.3000 -138.8500       4.8       139       202        97
WVCT   2025130    131400   -4.3600 -138.9100       5.5       154       200        88
WVCT   2025130    131400   -4.3600 -139.0000       6.0       149       196        78
WVCT   2025130    131400   -4.3000 -139.0700       5.1       144       198        86
WVCT   2025130    131400   -4.3600 -139.1600       7.5       123       209        98
WVCT   2025130    131400   -4.3400 -139.2700       4.8       149       211        83
WVCT   2025130    131400   -4.3800 -132.8600       8.4       110       201        88
WVCT   2025130    131400   -4.4000 -132.9900       9.2       109       199        88
WVCT   2025130    131400   -4.4200 -133.0600       9.4       115       203        88
WVCT   2025130    131400   -4.4400 -133.1400       8.8       115       203        81
WVCT   2025130    131400   -4.4000 -133.1900       7.3       110       193        66
WVCT   2025130    131400   -4.4600 -133.2800       5.7        91       192        80
WVCT   2025130    131400   -4.4400 -133.4500       4.6       104       222        86
WVCT   2025130    131400   -4.4500 -133.5200       5.4       119       224        77
WVCT   2025130    131400   -4.4200 -133.5900       5.7       128       220        81
WVCT   2025130    131400   -4.4500 -133.7200       4.2       121       218        97
WVCT   2025130    131400   -4.4500 -133.7400       4.2       121       218        98
WVCT   2025130    131400   -4.4000 -134.8300       5.0       141       208        70
WVCT   2025130    131400   -4.4500 -134.9400       4.3       111       208        86
WVCT   2025130    131400   -4.4500 -135.0100       4.2       119       203        88
WVCT   2025130    131400   -4.4000 -135.3400       4.4        96       198        62
WVCT   2025130    131400   -4.4300 -135.4700       5.5        68       193        69
WVCT   2025130    131400   -4.4500 -135.9400       4.2       113       201        74
WVCT   2025130    131400   -4.4500 -136.9400       9.3        75       223        86
WVCT   2025130    131400   -4.4500 -137.0100       7.1        73       193        83
WVCT   2025130    131400   -4.4500 -137.0800       6.2        65       188        80
WVCT   2025130    131400   -4.4500 -137.1400       7.0        41       186        68
WVCT   2025130    131400   -4.4500 -137.2600       7.0        83       188        60
WVCT   2025130    131400   -4.3800 -137.6400      12.4       147       228        62
WVCT   2025130    131400   -4.4300 -137.7500       8.2       151       222        75
WVCT   2025130    131400   -4.4100 -137.7700       8.2       149       222        70
WVCT   2025130    131400   -4.3800 -137.8900       5.6       139       208        93
WVCT   2025130    131400   -4.3900 -138.0200       5.7       130       191        99
WVCT   2025130    131400   -4.4300 -138.1100       7.0       127       200        97
WVCT   2025130    131400   -4.3900 -138.1700       6.4       124       203        98
WVCT   2025130    131400   -4.4300 -138.2900       4.9       133       184        82
WVCT   2025130    131400   -4.4500 -138.3800       4.2       134       183        99
WVCT   2025130    131400   -4.4100 -138.4200       5.2       140       205       100
WVCT   2025130    131400   -4.3900 -138.4900       6.3       138       207       100
WVCT   2025130    131400   -4.3800 -138.5800       5.6       150       206        98
WVCT   2025130    131400   -4.3800 -138.9200       6.8       154       196        91
WVCT   2025130    131400   -4.4500 -138.9800       7.6       141       195        91
WVCT   2025130    131400   -4.4100 -139.0300       8.0       133       196        68
WVCT   2025130    131400   -4.4100 -139.1200       8.2       121       210        74
WVCT   2025130    131400   -4.4500 -139.2100       4.9       120       213        98
WVCT   2025130    131400   -4.4100 -139.9200       4.6        85       211        80
WVCT   2025130    131400   -4.4500 -139.9300       5.0        96       210        96
WVCT   2025130    131400   -4.4300 -140.0400       8.2       114       210        97
WVCT   2025130    131400   -4.4700 -132.9400       8.4       107       189        77
WVCT   2025130    131400   -4.4900 -133.0300       9.7       119       197        89
WVCT   2025130    131400   -4.4700 -133.3000       5.7        91       194        81
WVCT   2025130    131400   -4.4900 -133.3200       5.8        93       196        84
WVCT   2025130    131400   -4.5100 -133.4300       5.3        88       219        76
WVCT   2025130    131400   -4.4700 -133.5200       5.5       118       224        79
WVCT   2025130    131400   -4.4900 -133.6500       4.8       123       221        64
WVCT   2025130    131400   -4.5100 -133.7800       4.4       120       218        62
WVCT   2025130    131400   -4.5100 -133.8700       4.2       121       216        63
WVCT   2025130    131400   -4.4900 -135.0000       4.1       120       205        98
WVCT   2025130    131400   -4.4700 -135.4500       4.8        73       192        95
WVCT   2025130    131400   -4.5400 -136.9700       5.4        70       193        78
WVCT   2025130    131400   -4.5200 -137.0400       5.6        73       190        86
WVCT   2025130    131400   -4.5200 -137.3300       5.5        80       187        75
WVCT   2025130    131400   -4.5200 -137.3700       5.5        84       187        64
WVCT   2025130    131400   -4.5400 -138.8500       4.2       151       191        78
WVCT   2025130    131400   -4.4700 -138.9600       7.6       143       195        87
WVCT   2025130    131400   -4.4700 -138.9800       7.1       141       196        92
WVCT   2025130    131400   -4.5400 -139.0900       5.1       108       210        63
WVCT   2025130    131400   -4.4700 -139.1900       4.9       114       213        90
WVCT   2025130    131400   -4.5400 -140.0100       9.1       118       209        61
WVCT   2025130    131400   -4.4700 -140.3100       5.6       191       205        84
WVCT   2025130    131400   -4.4700 -140.3800       4.1       171       205        90
WVCT   2025130    131400   -4.6000 -133.3000       6.4        99       203        65
WVCT   2025130    131400   -4.6200 -133.3700       6.0        91       203        82
WVCT   2025130    131400   -4.5800 -133.4600       5.6        99       226        72
WVCT   2025130    131400   -4.6400 -133.5700       5.3       121       229        64
WVCT   2025130    131400   -4.5800 -133.8100       4.4       115       220        62
WVCT   2025130    131400   -4.5600 -135.2000       4.0       139       196        82
WVCT   2025130    131400   -4.5600 -135.4000       4.6        88       192        77
WVCT   2025130    131400   -4.6300 -135.5600       7.4        98       186        86
WVCT   2025130    131400   -4.6100 -135.5800       6.6       101       186        94
WVCT   2025130    131400   -4.6300 -135.9200       7.1        91       206        93
WVCT   2025130    131400   -4.6300 -135.9800       7.4        90       191        89
WVCT   2025130    131400   -4.5800 -136.6600       4.3        33       190        66
WVCT   2025130    131400   -4.6300 -136.7500       4.9        58       190        89
WVCT   2025130    131400   -4.5600 -136.9200       4.9        66       220        64
WVCT   2025130    131400   -4.6300 -137.2200       5.0        54       185        63
WVCT   2025130    131400   -4.5900 -137.3200       6.7        67       186        69
WVCT   2025130    131400   -4.6300 -137.4400       6.9        90       182        80
WVCT   2025130    131400   -4.6300 -137.5000       7.0        93       181        79
WVCT   2025130    131400   -4.5600 -138.2700       5.4       125       182        63
WVCT   2025130    131400   -4.5900 -138.3500       5.3       130       178        63
WVCT   2025130    131400   -4.6300 -138.4500       5.3       135       176        67
WVCT   2025130    131400   -4.5900 -138.4900       4.4       134       178        67
WVCT   2025130    131400   -4.5900 -138.5600       4.0       136       180        68
WVCT   2025130    131400   -4.6300 -139.9200       4.5       110       214        74
WVCT   2025130    131400   -4.6300 -140.1300       7.0        87       209        76
WVCT   2025130    131400   -4.6100 -141.0900       5.0       144       183        66
WVCT   2025130    131400   -4.6300 -141.2700       5.0       111       195        73
WVCT   2025130    131400   -4.6300 -141.2900       5.1       108       194        76
WVCT   2025130    131400   -4.6900 -133.2100       6.3       102       198        68
WVCT   2025130    131400   -4.7300 -133.3000       5.1        98       188        76
WVCT   2025130    131400   -4.6700 -133.5400       5.5       110       230        66
WVCT   2025130    131400   -4.6700 -133.5700       5.6       115       230        61
WVCT   2025130    131400   -4.6500 -133.6600       4.1       121       227        73
WVCT   2025130    131400   -4.7300 -134.5000       6.9        90       205        67
WVCT   2025130    131400   -4.7300 -134.5800       7.0        92       205        91
WVCT   2025130    131400   -4.6700 -135.1600       4.0       144       189        92
WVCT   2025130    131400   -4.6700 -135.4700       6.9       101       186        92
WVCT   2025130    131400   -4.6900 -135.5800       5.7       111       183        99
WVCT   2025130    131400   -4.6500 -135.8700       5.6        94       208        99
WVCT   2025130    131400   -4.6500 -135.9400       7.4        90       204        94
WVCT   2025130    131400   -4.6900 -136.0800       4.3       129       190        85
WVCT   2025130    131400   -4.7200 -136.1000       4.5       141       190        87
WVCT   2025130    131400   -4.7000 -136.8300       4.5        57       190        93
WVCT   2025130    131400   -4.6500 -137.2200       4.7        48       185        70
WVCT   2025130    131400   -4.6500 -137.2800       6.7        54       185        78
WVCT   2025130    131400   -4.6700 -137.5300       5.6        76       181        77
WVCT   2025130    131400   -4.7200 -137.5700       4.8        46       178        86
WVCT   2025130    131400   -4.7200 -137.6600       4.1        57       187        91
WVCT   2025130    131400   -4.6500 -138.4200       5.3       138       176        63
WVCT   2025130    131400   -4.6700 -138.5300       5.4       146       177        75
WVCT   2025130    131400   -4.6700 -138.5400       5.4       146       177        77
WVCT   2025130    131400   -4.7200 -138.6500       4.7       150       179        93
WVCT   2025130    131400   -4.7200 -138.7400       4.5       156       180        99
WVCT   2025130    131400   -4.7200 -140.1500       5.6        26       218        66
WVCT   2025130    131400   -4.7200 -140.1700       6.2        18       218        61
WVCT   2025130    131400   -4.7000 -140.8900       5.0        93       172        65
WVCT   2025130    131400   -4.7000 -141.1800       5.8       122       204        77
WVCT   2025130    131400   -4.6800 -141.2000       5.6       120       203        79
WVCT   2025130    131400   -4.6500 -141.2900       5.7       108       198        78
WVCT   2025130    131400   -4.7500 -133.2400       5.5       108       185        71
WVCT   2025130    131400   -4.7500 -133.3000       5.0       104       186        78
WVCT   2025130    131400   -4.7500 -133.3900       6.1       108       181        64
WVCT   2025130    131400   -4.7800 -133.7400       4.6       136       206        62
WVCT   2025130    131400   -4.7600 -133.8800       6.0       111       205        60
WVCT   2025130    131400   -4.8000 -133.9400       5.4       108       201        71
WVCT   2025130    131400   -4.7800 -134.4800       6.0        96       205        78
WVCT   2025130    131400   -4.8200 -134.5600       6.0       108       204        87
WVCT   2025130    131400   -4.8200 -134.6700       5.1       111       203        95
WVCT   2025130    131400   -4.8200 -135.0100       4.3       144       200        89
WVCT   2025130    131400   -4.8200 -135.1400       5.1       147       192        92
WVCT   2025130    131400   -4.8200 -135.1600       4.8       149       190        92
WVCT   2025130    131400   -4.8000 -135.8800       5.5        99       203        86
WVCT   2025130    131400   -4.8000 -136.1400       5.2       139       189        95
WVCT   2025130    131400   -4.7800 -136.1900       5.1       135       189        92
WVCT   2025130    131400   -4.7800 -137.2200       4.1         3       177        76
WVCT   2025130    131400   -4.8100 -137.3100       4.0        20       168        76
WVCT   2025130    131400   -4.7900 -137.3500       5.0        37       170        72
WVCT   2025130    131400   -4.7400 -137.6600       5.3        45       185        84
WVCT   2025130    131400   -4.7600 -138.4000       5.6       149       180        68
WVCT   2025130    131400   -4.7600 -138.4900       6.0       142       177        69
WVCT   2025130    131400   -4.8100 -138.5800       4.3       141       174        84
WVCT   2025130    131400   -4.7900 -138.6200       4.2       141       176        82
WVCT   2025130    131400   -4.7400 -138.7400       4.4       156       180       100
WVCT   2025130    131400   -4.7600 -138.7800       4.0       159       182        99
WVCT   2025130    131400   -4.7800 -139.2700       4.1       274       210        88
WVCT   2025130    131400   -4.7400 -139.3200       5.7       274       210        61
WVCT   2025130    131400   -4.7700 -141.1100       5.9       146       208        87
WVCT   2025130    131400   -4.7400 -141.1600       6.2       124       209        79
WVCT   2025130    131400   -4.8900 -133.1100       4.0        87       177        63
WVCT   2025130    131400   -4.9100 -133.1500       4.1        79       177        69
WVCT   2025130    131400   -4.8700 -133.3000       4.0       103       180        89
WVCT   2025130    131400   -4.8700 -133.3500       4.2       110       188        89
WVCT   2025130    131400   -4.9100 -133.4800       6.6       140       227        76
WVCT   2025130    131400   -4.9100 -133.5500       6.5       138       218        84
WVCT   2025130    131400   -4.9100 -133.5900       5.9       134       213        90
WVCT   2025130    131400   -4.9100 -133.6800       4.6       131       208        93
WVCT   2025130    131400   -4.9100 -134.4800       5.9       135       206        78
WVCT   2025130    131400   -4.9100 -134.5000       6.1       134       206        79
WVCT   2025130    131400   -4.9100 -134.6100       5.4       124       203        94
WVCT   2025130    131400   -4.8300 -134.6800       4.5       120       203        99
WVCT   2025130    131400   -4.8300 -135.1200       5.2       145       194        91
WVCT   2025130    131400   -4.8300 -135.1400       5.2       147       193        88
WVCT   2025130    131400   -4.9100 -135.8300       6.3       123       195        94
WVCT   2025130    131400   -4.8300 -135.9000       5.9       108       201        84
WVCT   2025130    131400   -4.9100 -135.9500       5.8       119       195        84
WVCT   2025130    131400   -4.9100 -136.1200       5.6       121       185        95
WVCT   2025130    131400   -4.9100 -136.1400       5.8       118       185        95
WVCT   2025130    131400   -4.9100 -136.2600       4.8       109       187        97
WVCT   2025130    131400   -4.8500 -137.3500       4.5        44       165        66
WVCT   2025130    131400   -4.9000 -138.4700       4.3       135       182        81
WVCT   2025130    131400   -4.8300 -138.4900       4.9       144       179        75
WVCT   2025130    131400   -4.8800 -138.6200       4.2       134       176        78
WVCT   2025130    131400   -4.9000 -139.4500       6.3        32       199        74
WVCT   2025130    131400   -4.9000 -140.4000       4.2       115       206        83
WVCT   2025130    131400   -4.8500 -140.4700       4.5       106       207        72
WVCT   2025130    131400   -4.9000 -140.6200       5.9       110       206        62
WVCT   2025130    131400   -4.8300 -141.1200       6.8       138       203        89
WVCT   2025130    131400   -4.8300 -141.2000       8.1       121       202        68
WVCT   2025130    131400   -4.9000 -141.2300       7.3       122       203        65
WVCT   2025130    131400   -4.9300 -133.1500       4.3        76       177        66
WVCT   2025130    131400   -4.9500 -133.3100       4.9        59       185        64
WVCT   2025130    131400   -4.9500 -133.3700       4.0        90       198        79
WVCT   2025130    131400   -4.9600 -133.5300       5.2       127       228        84
WVCT   2025130    131400   -4.9800 -133.5700       4.9       119       226        90
WVCT   2025130    131400   -4.9500 -133.6400       5.1       122       211       100
WVCT   2025130    131400   -4.9600 -134.2800       4.4       134       211        92
WVCT   2025130    131400   -4.9800 -134.4500       7.1       157       209        77
WVCT   2025130    131400   -4.9300 -134.5000       6.3       141       207        75
WVCT   2025130    131400   -4.9300 -134.5900       5.9       131       204        87
WVCT   2025130    131400   -4.9600 -134.6600       5.3       131       207        90
WVCT   2025130    131400   -5.0000 -135.0800       5.4       102       196        84
WVCT   2025130    131400   -4.9800 -135.1400       5.0       106       192        89
WVCT   2025130    131400   -5.0000 -135.6100       4.3       114       208        76
WVCT   2025130    131400   -4.9800 -135.6500       4.0       130       208        67
WVCT   2025130    131400   -4.9800 -135.8100       5.2       178       194        97
WVCT   2025130    131400   -4.9800 -135.8300       5.3       178       193        97
WVCT   2025130    131400   -4.9200 -135.9900       5.9       118       192        82
WVCT   2025130    131400   -4.9400 -136.0800       5.9       114       185        88
WVCT   2025130    131400   -4.9200 -136.1200       5.6       119       185        95
WVCT   2025130    131400   -4.9200 -136.2300       5.0       112       187        99
WVCT   2025130    131400   -4.9200 -138.1600       4.3       150       193        63
WVCT   2025130    131400   -4.9400 -138.3300       5.4       155       190        93
WVCT   2025130    131400   -4.9200 -138.4000       5.0       153       186        92
WVCT   2025130    131400   -4.9600 -138.6000       4.1       132       181        73
WVCT   2025130    131400   -4.9200 -139.3400       5.3        19       190        64
WVCT   2025130    131400   -4.9200 -139.3700       5.9        24       190        72
WVCT   2025130    131400   -4.9600 -140.0800       6.3       130       202        60
WVCT   2025130    131400   -4.9400 -140.4200       5.3       112       205        89
WVCT   2025130    131400   -4.9700 -140.4600       6.6       106       204        96
WVCT   2025130    131400   -4.9900 -140.5800       8.2       105       202        69
WVCT   2025130    131400   -4.9600 -140.8400       5.5        33       224        94
WVCT   2025130    131400   -4.9200 -141.1400       7.4       133       199        74
WVCT   2025130    131400   -4.9200 -141.2500       6.0       121       205        69
WVCT   2025130    131400   -5.0900 -132.9600       5.0       110       186        98
WVCT   2025130    131400   -5.0900 -133.0000       4.6       105       184        93
WVCT   2025130    131400   -5.0700 -133.5100       4.5       116       229        77
WVCT   2025130    131400   -5.0700 -133.5500       4.6       116       229        78
WVCT   2025130    131400   -5.0900 -134.2100       4.7        83       216        86
WVCT   2025130    131400   -5.0200 -134.3400       5.5       133       210        87
WVCT   2025130    131400   -5.0400 -134.4400       6.9       162       209        80
WVCT   2025130    131400   -5.0200 -134.4600       7.0       158       209        80
WVCT   2025130    131400   -5.0500 -134.5500       6.6       151       208        86
WVCT   2025130    131400   -5.0500 -135.0300       6.2        95       206        97
WVCT   2025130    131400   -5.0300 -135.0500       5.7        95       205        96
WVCT   2025130    131400   -5.0700 -135.4800       4.3       127       196        98
WVCT   2025130    131400   -5.0300 -135.5700       5.4        96       197        98
WVCT   2025130    131400   -5.0200 -135.5900       4.4       110       205        80
WVCT   2025130    131400   -5.0100 -135.9400       5.1       136       187       100
WVCT   2025130    131400   -5.0900 -135.9700       5.3       118       184        95
WVCT   2025130    131400   -5.0500 -136.1200       4.2       131       188        94
WVCT   2025130    131400   -5.0100 -136.1900       4.1       124       181        98
WVCT   2025130    131400   -5.0100 -136.5200       4.0        85       208        99
WVCT   2025130    131400   -5.0700 -136.5900       5.3        95       208        77
WVCT   2025130    131400   -5.0500 -137.1700       6.9       208       184        67
WVCT   2025130    131400   -5.0700 -137.2900       4.6       192       171        63
WVCT   2025130    131400   -5.0100 -138.6000       4.0       126       183        63
WVCT   2025130    131400   -5.0100 -139.1200       4.0       179       190        87
WVCT   2025130    131400   -5.0300 -139.5400       4.3        20       197        86
WVCT   2025130    131400   -5.0100 -139.8400       4.2       156       193        70
WVCT   2025130    131400   -5.0100 -139.9700       8.5       147       189        61
WVCT   2025130    131400   -5.0100 -140.3500       5.0       106       199        98
WVCT   2025130    131400   -5.0100 -140.4200       5.6       108       199        96
WVCT   2025130    131400   -5.0100 -140.4700       6.5       104       198        97
WVCT   2025130    131400   -5.0300 -140.5600       7.3       104       179        89
WVCT   2025130    131400   -5.0800 -141.3800       4.4       116       218        61
WVCT   2025130    131400   -5.1900 -132.8900       5.0       118       184        93
WVCT   2025130    131400   -5.1500 -132.9300       4.9       114       185        98
WVCT   2025130    131400   -5.1500 -133.4400       4.2       125       228        92
WVCT   2025130    131400   -5.1100 -133.5100       4.7       120       229        85
WVCT   2025130    131400   -5.1100 -133.5700       4.9       119       229        88
WVCT   2025130    131400   -5.1600 -134.1900       4.5        95       210        74
WVCT   2025130    131400   -5.1100 -134.4300       6.2       167       208        82
WVCT   2025130    131400   -5.1400 -134.5200       5.1       163       208        96
WVCT   2025130    131400   -5.1600 -134.6100       4.7       177       207        64
WVCT   2025130    131400   -5.1300 -135.0300       6.8        85       202        81
WVCT   2025130    131400   -5.1300 -135.0400       6.9        83       200        82
WVCT   2025130    131400   -5.1300 -135.1400       4.1        72       199        75
WVCT   2025130    131400   -5.1800 -135.3700       4.1       138       206       100
WVCT   2025130    131400   -5.1800 -135.5500       4.4       109       202        96
WVCT   2025130    131400   -5.1800 -135.6300       5.4        98       200        99
WVCT   2025130    131400   -5.1800 -135.7500       4.3       101       197        82
WVCT   2025130    131400   -5.1800 -135.7700       4.1       104       197        80
WVCT   2025130    131400   -5.1200 -135.9000       4.3       122       193        86
WVCT   2025130    131400   -5.1100 -135.9500       4.9       121       188        84
WVCT   2025130    131400   -5.1800 -136.1200       4.5       111       194        91
WVCT   2025130    131400   -5.1800 -136.2100       5.2       120       183        86
WVCT   2025130    131400   -5.1200 -136.5900       5.0       103       203        90
WVCT   2025130    131400   -5.1200 -139.1200       4.2       149       199        96
WVCT   2025130    131400   -5.1600 -139.2800       5.0       174       188        82
WVCT   2025130    131400   -5.1600 -139.3500       4.9       170       187        99
WVCT   2025130    131400   -5.1000 -139.9900       4.5       140       184        76
WVCT   2025130    131400   -5.1800 -140.3700       5.9        77       183        94
WVCT   2025130    131400   -5.1800 -140.4200       4.9        87       183        95
WVCT   2025130    131400   -5.1400 -140.4900       5.5        97       179        92
WVCT   2025130    131400   -5.1200 -140.6000       6.8        99       178        82
WVCT   2025130    131400   -5.1600 -140.8000       5.0        59       199        92
WVCT   2025130    131400   -5.1400 -141.3900       4.5       108       213        70
WVCT   2025130    131400   -5.2000 -132.8900       4.8       116       184        91
WVCT   2025130    131400   -5.2800 -132.9800       5.7       123       196        95
WVCT   2025130    131400   -5.2800 -133.0000       6.1       123       195        97
WVCT   2025130    131400   -5.2000 -133.4800       5.7       135       228        84
WVCT   2025130    131400   -5.2000 -133.5300       5.9       142       229        77
WVCT   2025130    131400   -5.2700 -133.6400       5.1       154       219        89
WVCT   2025130    131400   -5.2700 -133.7900       4.5       149       219        84
WVCT   2025130    131400   -5.2400 -134.2200       5.5        88       209        64
WVCT   2025130    131400   -5.2000 -135.0300       5.1        99       202        76
WVCT   2025130    131400   -5.2700 -135.3700       4.3       136       197        99
WVCT   2025130    131400   -5.2300 -135.5300       4.4       117       200        93
WVCT   2025130    131400   -5.2300 -135.5500       4.6       114       200        91
WVCT   2025130    131400   -5.2700 -135.6800       5.9       130       194        66
WVCT   2025130    131400   -5.2500 -135.8100       5.6       134       193        94
WVCT   2025130    131400   -5.2300 -135.8200       5.4       134       197       100
WVCT   2025130    131400   -5.2700 -135.9900       6.6        99       202        96
WVCT   2025130    131400   -5.2300 -136.0200       6.1        98       200        92
WVCT   2025130    131400   -5.2700 -136.1300       7.9        94       195        89
WVCT   2025130    131400   -5.2300 -136.1900       6.9       102       190        91
WVCT   2025130    131400   -5.2100 -136.3500       4.2       112       181        79
WVCT   2025130    131400   -5.2300 -137.1300       6.1       233       188        62
WVCT   2025130    131400   -5.2100 -137.5300       4.0        54       168        99
WVCT   2025130    131400   -5.2300 -138.5800       4.3        45       172        96
WVCT   2025130    131400   -5.2100 -139.2300       5.3       159       197        84
WVCT   2025130    131400   -5.1900 -139.3400       5.1       166       188        96
WVCT   2025130    131400   -5.1900 -139.3500       4.8       167       187        96
WVCT   2025130    131400   -5.2700 -139.4400       4.9       127       193        87
WVCT   2025130    131400   -5.1900 -139.6400       4.3        40       188        71
WVCT   2025130    131400   -5.1900 -140.2900       7.5        74       178        68
WVCT   2025130    131400   -5.1900 -140.3700       6.6        75       181        89
WVCT   2025130    131400   -5.1900 -140.5100       5.2        95       179        95
WVCT   2025130    131400   -5.2700 -140.5500       4.0        81       180        79
WVCT   2025130    131400   -5.2700 -140.6700       5.4        82       182        80
WVCT   2025130    131400   -5.2700 -140.7800       5.1        63       189        85
WVCT   2025130    131400   -5.2700 -140.8000       4.8        59       190        96
WVCT   2025130    131400   -5.2700 -141.2700       4.5       122       238        83
WVCT   2025130    131400   -5.2700 -141.3600       6.1       103       227        77
WVCT   2025130    131400   -5.2900 -132.9800       5.8       126       195        97
WVCT   2025130    131400   -5.2900 -133.0000       6.3       126       191        93
WVCT   2025130    131400   -5.2900 -133.0900       8.4       131       190        91
WVCT   2025130    131400   -5.3100 -133.6000       5.1       155       218        86
WVCT   2025130    131400   -5.2900 -133.6200       5.3       154       218        84
WVCT   2025130    131400   -5.3700 -133.7800       5.6       144       220        65
WVCT   2025130    131400   -5.3700 -133.8000       5.5       145       220        66
WVCT   2025130    131400   -5.3600 -135.0100       4.4       150       210        86
WVCT   2025130    131400   -5.3400 -135.0200       4.6       148       209        91
WVCT   2025130    131400   -5.3400 -135.3200       4.1       139       203        93
WVCT   2025130    131400   -5.2900 -135.3900       4.0       133       196        97
WVCT   2025130    131400   -5.3600 -135.5300       4.9       135       194        99
WVCT   2025130    131400   -5.3400 -135.5700       5.3       132       195        99
WVCT   2025130    131400   -5.2900 -135.7200       5.9       136       193        67
WVCT   2025130    131400   -5.3200 -135.7500       5.6       129       193        68
WVCT   2025130    131400   -5.3200 -135.8600       6.6        92       196        93
WVCT   2025130    131400   -5.2900 -135.9700       6.7       100       202        97
WVCT   2025130    131400   -5.3400 -136.0200       8.2        85       197        97
WVCT   2025130    131400   -5.3400 -136.1900       9.2        88       196        99
WVCT   2025130    131400   -5.3200 -136.2200       9.2        92       196        96
WVCT   2025130    131400   -5.3100 -136.3300       7.6       100       187        92
WVCT   2025130    131400   -5.2900 -136.4200       4.5        94       176        86
WVCT   2025130    131400   -5.3200 -136.7000       4.7       112       184        92
WVCT   2025130    131400   -5.3400 -136.8000       5.2       114       175        80
WVCT   2025130    131400   -5.3400 -136.8600       4.0       107       178        96
WVCT   2025130    131400   -5.3400 -136.9700       4.0        77       192        98
WVCT   2025130    131400   -5.3600 -137.0200       5.7        80       203       100
WVCT   2025130    131400   -5.3400 -137.5500       4.2        63       167        80
WVCT   2025130    131400   -5.3600 -137.5600       4.4        68       167        85
WVCT   2025130    131400   -5.3600 -137.7800       4.1        26       180        93
WVCT   2025130    131400   -5.3600 -137.9800       4.1        32       180        73
WVCT   2025130    131400   -5.3200 -138.4700       4.8        68       161        84
WVCT   2025130    131400   -5.2800 -138.6100       4.2        31       166        97
WVCT   2025130    131400   -5.3600 -139.3000       5.4       162       198        75
WVCT   2025130    131400   -5.3400 -139.3900       5.6       150       197        87
WVCT   2025130    131400   -5.3600 -139.5000       5.4       143       185        67
WVCT   2025130    131400   -5.3400 -139.6100       7.3        66       185        69
WVCT   2025130    131400   -5.3600 -139.7200       8.7        26       185        83
WVCT   2025130    131400   -5.2800 -139.7900       6.8       356       187        84
WVCT   2025130    131400   -5.2800 -139.9300       5.0        32       184        83
WVCT   2025130    131400   -5.2800 -140.2600       8.7        78       177        85
WVCT   2025130    131400   -5.3000 -140.2800       9.3        85       177       100
WVCT   2025130    131400   -5.3000 -140.4400       7.1        83       182        73
WVCT   2025130    131400   -5.3400 -140.4600       6.4        87       182        82
WVCT   2025130    131400   -5.2800 -140.6700       5.1        79       181        82
WVCT   2025130    131400   -5.2800 -140.8000       4.9        66       187        98
WVCT   2025130    131400   -5.3000 -140.8200       5.0        69       185        94
WVCT   2025130    131400   -5.2800 -140.9600       4.0        86       216        97
WVCT   2025130    131400   -5.3000 -141.0700       4.1        88       216       100
WVCT   2025130    131400   -5.2800 -141.2500       4.0       129       240        90
WVCT   2025130    131400   -5.2800 -141.2700       4.6       129       242        91
WVCT   2025130    131400   -5.2800 -141.3800       5.5       101       228        86
WVCT   2025130    131400   -5.4000 -132.8700       4.1       123       174        69
WVCT   2025130    131400   -5.4200 -132.9000       4.6       132       174        75
WVCT   2025130    131400   -5.4600 -133.0300       5.1       132       182        95
WVCT   2025130    131400   -5.4000 -133.0900       6.0       135       181        90
WVCT   2025130    131400   -5.4000 -133.8200       5.1       144       221        66
WVCT   2025130    131400   -5.4200 -133.8600       4.9       140       220        65
WVCT   2025130    131400   -5.3800 -134.1700       4.2        64       217        68
WVCT   2025130    131400   -5.3800 -134.2200       6.0        64       217        64
WVCT   2025130    131400   -5.3800 -134.9500       4.2       163       213        88
WVCT   2025130    131400   -5.3800 -135.1000       6.1       159       208        77
WVCT   2025130    131400   -5.4500 -135.2000       5.3       167       204        62
WVCT   2025130    131400   -5.4200 -135.4100       4.3       137       206        99
WVCT   2025130    131400   -5.4000 -135.5700       4.8       137       194        84
WVCT   2025130    131400   -5.4200 -135.7700       4.3       109       191        98
WVCT   2025130    131400   -5.3800 -135.9300       7.6        83       195        95
WVCT   2025130    131400   -5.3800 -136.0100       7.9        86       196        94
WVCT   2025130    131400   -5.4000 -136.1000       7.5        93       193        94
WVCT   2025130    131400   -5.4200 -136.1700       8.2        84       191       100
WVCT   2025130    131400   -5.4200 -136.2200       8.6        82       193        99
WVCT   2025130    131400   -5.3800 -136.3300       7.7        95       190        94
WVCT   2025130    131400   -5.4100 -136.6400       4.5       118       167        60
WVCT   2025130    131400   -5.4300 -136.7500       4.5        99       171        90
WVCT   2025130    131400   -5.4500 -136.7700       4.2        96       170        89
WVCT   2025130    131400   -5.4300 -137.0200       5.6        83       199       100
WVCT   2025130    131400   -5.4300 -137.0400       5.5        78       202        95
WVCT   2025130    131400   -5.4000 -137.4700       5.4        61       191        61
WVCT   2025130    131400   -5.4500 -137.5500       9.7        79       192        97
WVCT   2025130    131400   -5.4500 -137.5800       9.4        80       190       100
WVCT   2025130    131400   -5.4100 -137.7500       5.3        38       182        94
WVCT   2025130    131400   -5.3800 -137.7600       4.6        30       178        93
WVCT   2025130    131400   -5.4300 -137.8700       8.0        27       182        96
WVCT   2025130    131400   -5.3900 -137.9400       6.3        34       179        86
WVCT   2025130    131400   -5.4500 -138.1100       5.2        69       168       100
WVCT   2025130    131400   -5.4500 -138.1800       5.7        93       159        98
WVCT   2025130    131400   -5.4300 -138.2900       5.5        94       160        62
WVCT   2025130    131400   -5.3800 -138.7900       4.5        73       150        79
WVCT   2025130    131400   -5.3900 -138.9200       4.7        90       162        83
WVCT   2025130    131400   -5.4500 -139.4300       7.3       165       187       100
WVCT   2025130    131400   -5.3800 -139.4800       6.1       150       186        77
WVCT   2025130    131400   -5.4500 -139.6100       5.0       112       183        95
WVCT   2025130    131400   -5.4100 -139.6600       5.5        63       184        99
WVCT   2025130    131400   -5.4300 -139.9500       4.3       185       182        77
WVCT   2025130    131400   -5.4500 -140.1900       4.9       143       177        85
WVCT   2025130    131400   -5.4500 -140.2800       5.9       116       178        95
WVCT   2025130    131400   -5.4300 -140.2900       6.4       113       178        95
WVCT   2025130    131400   -5.3900 -140.3800       8.8        92       181        94
WVCT   2025130    131400   -5.3900 -140.8000       4.3        70       178        82
WVCT   2025130    131400   -5.3800 -140.8700       5.4        82       179        97
WVCT   2025130    131400   -5.3800 -140.9600       5.2        93       186        92
WVCT   2025130    131400   -5.4500 -141.0900       4.4        81       193       100
WVCT   2025130    131400   -5.4300 -141.1100       4.1        89       213        99
WVCT   2025130    131400   -5.4800 -133.0000       4.2       133       177        94
WVCT   2025130    131400   -5.4800 -133.0500       4.4       135       188        87
WVCT   2025130    131400   -5.4900 -134.2000       4.6        74       219        85
WVCT   2025130    131400   -5.5100 -134.2200       4.8        74       219        87
WVCT   2025130    131400   -5.5100 -134.3800       4.7        83       217        99
WVCT   2025130    131400   -5.5100 -134.8400       4.7       156       217        68
WVCT   2025130    131400   -5.5300 -134.8600       5.1       157       217        67
WVCT   2025130    131400   -5.4700 -134.9900       4.6       163       213        81
WVCT   2025130    131400   -5.4700 -135.1900       5.9       170       204        60
WVCT   2025130    131400   -5.4700 -135.4600       5.2       145       221        90
WVCT   2025130    131400   -5.4900 -135.9300       5.8       106       199        89
WVCT   2025130    131400   -5.4700 -135.9500       6.2       102       199        85
WVCT   2025130    131400   -5.5400 -136.1100       5.5       107       186        94
WVCT   2025130    131400   -5.4900 -136.1500       6.9        87       187        96
WVCT   2025130    131400   -5.5200 -136.2600       7.1        84       182        99
WVCT   2025130    131400   -5.5100 -136.5100       4.1       169       174        99
WVCT   2025130    131400   -5.5400 -136.6000       5.0       169       170        78
WVCT   2025130    131400   -5.4700 -137.1300       5.3        66       217        65
WVCT   2025130    131400   -5.5400 -137.4200      10.0        71       211        98
WVCT   2025130    131400   -5.4700 -137.5600      10.7        79       214        98
WVCT   2025130    131400   -5.4700 -137.5800      10.4        79       213       100
WVCT   2025130    131400   -5.4900 -137.7300       7.0        51       184       100
WVCT   2025130    131400   -5.4900 -137.8200       8.2        31       184        93
WVCT   2025130    131400   -5.5400 -137.8900      10.9        42       180        97
WVCT   2025130    131400   -5.4700 -138.0000       9.2        47       175        98
WVCT   2025130    131400   -5.4700 -138.0900       6.0        65       167       100
WVCT   2025130    131400   -5.4700 -138.1200       5.7        76       166       100
WVCT   2025130    131400   -5.5400 -138.2100       5.9        99       135        78
WVCT   2025130    131400   -5.5200 -138.7600       4.5        73       134        90
WVCT   2025130    131400   -5.4900 -138.9000       5.6        88       145        75
WVCT   2025130    131400   -5.5400 -139.4100       6.2       172       187        86
WVCT   2025130    131400   -5.5400 -139.5500       5.9       167       186        97
WVCT   2025130    131400   -5.5000 -139.5700       5.7       152       183        93
WVCT   2025130    131400   -5.5000 -139.7200       4.0       149       183        80
WVCT   2025130    131400   -5.5200 -139.7700       5.3       154       182        96
WVCT   2025130    131400   -5.5000 -139.8800       5.7       179       182        98
WVCT   2025130    131400   -5.5400 -139.9900       4.1       165       181        74
WVCT   2025130    131400   -5.5000 -140.0900       5.2       121       179        81
WVCT   2025130    131400   -5.5200 -140.1300       5.1       123       179        81
WVCT   2025130    131400   -5.4700 -140.2600       5.2       121       178        99
WVCT   2025130    131400   -5.5400 -140.3100       4.1        98       182        98
WVCT   2025130    131400   -5.4800 -140.9800       5.2        81       181        79
WVCT   2025130    131400   -5.4700 -141.0900       4.4        72       188        99
WVCT   2025130    131400   -5.5600 -134.8000       4.2       146       218        69
WVCT   2025130    131400   -5.5600 -134.8200       4.6       150       218        70
WVCT   2025130    131400   -5.6000 -135.4200       4.3       127       233        80
WVCT   2025130    131400   -5.5800 -135.4600       4.3       128       230        73
WVCT   2025130    131400   -5.6300 -135.6400       4.4        97       186        81
WVCT   2025130    131400   -5.6300 -135.7800       4.1       143       182        64
WVCT   2025130    131400   -5.5600 -135.9700       5.4       135       187        99
WVCT   2025130    131400   -5.6200 -136.0200       4.8       115       183        99
WVCT   2025130    131400   -5.6000 -136.0900       5.1       119       182        96
WVCT   2025130    131400   -5.6000 -136.1700       5.7       102       182        99
WVCT   2025130    131400   -5.5800 -136.2600       5.9        92       182       100
WVCT   2025130    131400   -5.5600 -136.8700       4.1        90       170        85
WVCT   2025130    131400   -5.5600 -136.9100       4.0        89       170        82
WVCT   2025130    131400   -5.6300 -137.3300       7.4        53       213        72
WVCT   2025130    131400   -5.6300 -137.3600       8.9        52       204        70
WVCT   2025130    131400   -5.6300 -137.4400      10.7        56       188        91
WVCT   2025130    131400   -5.5800 -137.6200      13.6        66       216        84
WVCT   2025130    131400   -5.5800 -137.7800       6.9        41       184        84
WVCT   2025130    131400   -5.6100 -137.8700       8.4        52       170        97
WVCT   2025130    131400   -5.6000 -137.8900       9.2        51       169        99
WVCT   2025130    131400   -5.5600 -138.0200       8.7        58       157        99
WVCT   2025130    131400   -5.6300 -138.0900       5.7        59       152        92
WVCT   2025130    131400   -5.5900 -138.4500       4.1       336       122        78
WVCT   2025130    131400   -5.6300 -138.5400       4.7       339       122        60
WVCT   2025130    131400   -5.5900 -138.6800       7.5        79       133       100
WVCT   2025130    131400   -5.6100 -138.7600       6.2        95       138        90
WVCT   2025130    131400   -5.6100 -138.8700       5.3        79       138        70
WVCT   2025130    131400   -5.6300 -138.8800       5.4        75       140        74
WVCT   2025130    131400   -5.5600 -139.3900       5.2       171       188        86
WVCT   2025130    131400   -5.5600 -139.4300       6.1       174       187        90
WVCT   2025130    131400   -5.6300 -139.6200       4.5       160       188        75
WVCT   2025130    131400   -5.6100 -139.7700      10.7       167       187        96
WVCT   2025130    131400   -5.6300 -139.8100      11.1       168       188       100
WVCT   2025130    131400   -5.5900 -139.9000      10.0       175       185        98
WVCT   2025130    131400   -5.5800 -139.9900       7.5       168       182        77
WVCT   2025130    131400   -5.5800 -140.1300       4.5       113       180        62
WVCT   2025130    131400   -5.5600 -140.1700       4.8       126       179        71
WVCT   2025130    131400   -5.6300 -140.2400       5.2       138       184        82
WVCT   2025130    131400   -5.6300 -140.6500       4.5        87       161        98
WVCT   2025130    131400   -5.6100 -140.7300       4.4        99       167        93
WVCT   2025130    131400   -5.5800 -141.0000       4.7        77       179        73
WVCT   2025130    131400   -5.6300 -141.3400       4.4        37       195        93
WVCT   2025130    131400   -5.6500 -135.4600       5.0       112       201        68
WVCT   2025130    131400   -5.7100 -135.5700       6.3        94       190        63
WVCT   2025130    131400   -5.6700 -135.6600       5.3        94       186        73
WVCT   2025130    131400   -5.6500 -135.6800       4.6       100       185        75
WVCT   2025130    131400   -5.6900 -135.9800       4.4       144       183        97
WVCT   2025130    131400   -5.7300 -136.0600       4.8       124       183       100
WVCT   2025130    131400   -5.6700 -136.1700       5.2       114       184       100
WVCT   2025130    131400   -5.6900 -136.2600       4.9       109       195       100
WVCT   2025130    131400   -5.7300 -136.3100       5.0       101       188        97
WVCT   2025130    131400   -5.7200 -136.4000       4.7       101       180        86
WVCT   2025130    131400   -5.7200 -136.9300       6.1        87       162        77
WVCT   2025130    131400   -5.6700 -137.0200       4.3        77       167        75
WVCT   2025130    131400   -5.6700 -137.2200       4.2        76       217        65
WVCT   2025130    131400   -5.6900 -137.3300       6.3        76       201        84
WVCT   2025130    131400   -5.7200 -137.4200       8.0        44       188        88
WVCT   2025130    131400   -5.7200 -137.4900      10.2        36       170        94
WVCT   2025130    131400   -5.6900 -137.7400       8.5        27       171        85
WVCT   2025130    131400   -5.6500 -137.7800       6.5        34       177        77
WVCT   2025130    131400   -5.6500 -137.8700       7.1        56       169        99
WVCT   2025130    131400   -5.7200 -138.0100       4.9        56       159        82
WVCT   2025130    131400   -5.7200 -138.0700       5.0        62       155        83
WVCT   2025130    131400   -5.6900 -138.2000       6.2        71       140        72
WVCT   2025130    131400   -5.7200 -138.2900       7.5        68       135        78
WVCT   2025130    131400   -5.6900 -138.7400       7.0        95       140        98
WVCT   2025130    131400   -5.7000 -138.8300       4.5        79       152        90
WVCT   2025130    131400   -5.6700 -138.9200       4.0        57       151        65
WVCT   2025130    131400   -5.7200 -139.0500       4.0       320       174        76
WVCT   2025130    131400   -5.7200 -139.7500      11.5       161       189        64
WVCT   2025130    131400   -5.7200 -139.8600      11.6       174       187        93
WVCT   2025130    131400   -5.7000 -139.9500      11.7       176       186        98
WVCT   2025130    131400   -5.7000 -140.0900       7.2       145       185        87
WVCT   2025130    131400   -5.6900 -140.1100       6.7       142       185        76
WVCT   2025130    131400   -5.6500 -140.2400       5.6       145       185        81
WVCT   2025130    131400   -5.6500 -140.7300       5.1       102       167        97
WVCT   2025130    131400   -5.7200 -140.7600       5.3       105       168        90
WVCT   2025130    131400   -5.7200 -141.3400       5.0        61       191        99
WVCT   2025130    131400   -5.8100 -132.9000       5.0       124       174        75
WVCT   2025130    131400   -5.8200 -135.5600       5.0        99       193        62
WVCT   2025130    131400   -5.8000 -135.6400       6.2        90       188        67
WVCT   2025130    131400   -5.7400 -135.6700       6.3        88       184        62
WVCT   2025130    131400   -5.8200 -135.8200       5.3       105       180        63
WVCT   2025130    131400   -5.7800 -135.8700       4.8       122       180        67
WVCT   2025130    131400   -5.8000 -136.0000       4.4       144       186        92
WVCT   2025130    131400   -5.7400 -136.0400       4.5       126       183        99
WVCT   2025130    131400   -5.8200 -136.2000       7.4        76       193        99
WVCT   2025130    131400   -5.7600 -136.2700       6.0        89       191        99
WVCT   2025130    131400   -5.7600 -136.3600       6.3        87       183        99
WVCT   2025130    131400   -5.7800 -136.4600       7.0        80       179       100
WVCT   2025130    131400   -5.8000 -136.4900       7.7        77       179       100
WVCT   2025130    131400   -5.8200 -136.6500       4.8        83       171        85
WVCT   2025130    131400   -5.8200 -136.9300       4.5        99       159        99
WVCT   2025130    131400   -5.7400 -137.0000       5.0        87       162        71
WVCT   2025130    131400   -5.7400 -137.0900       4.3        80       168        86
WVCT   2025130    131400   -5.7400 -137.3600       6.7        67       198        66
WVCT   2025130    131400   -5.7600 -137.4700       8.4        38       174        89
WVCT   2025130    131400   -5.7800 -137.4900       8.3        35       172        90
WVCT   2025130    131400   -5.7600 -137.8300       4.0        33       173        97
WVCT   2025130    131400   -5.8000 -137.9400       4.8        48       173       100
WVCT   2025130    131400   -5.8100 -138.0300       5.4        36       162        99
WVCT   2025130    131400   -5.8000 -138.1200       4.6        40       155        97
WVCT   2025130    131400   -5.7400 -138.2700       7.3        73       137        85
WVCT   2025130    131400   -5.7800 -138.3000       8.5        71       137        97
WVCT   2025130    131400   -5.7600 -138.4300       9.0        68       131        99
WVCT   2025130    131400   -5.7600 -138.5400       5.7       109       128        81
WVCT   2025130    131400   -5.8000 -138.7200       6.4        82       148        95
WVCT   2025130    131400   -5.8000 -138.7700       5.7        67       157        93
WVCT   2025130    131400   -5.8000 -138.9000       4.2        18       175        92
WVCT   2025130    131400   -5.7400 -139.0300       4.0       325       174        83
WVCT   2025130    131400   -5.7600 -139.1400       4.2       294       180        86
WVCT   2025130    131400   -5.7400 -139.5700       4.0        50       188        62
WVCT   2025130    131400   -5.7400 -139.8800      11.1       175       187        91
WVCT   2025130    131400   -5.8100 -139.9300       8.8       174       186        63
WVCT   2025130    131400   -5.7900 -140.0900       8.5       154       186        92
WVCT   2025130    131400   -5.7400 -140.1100       7.8       152       186        93
WVCT   2025130    131400   -5.7600 -140.2200       8.2       162       188        98
WVCT   2025130    131400   -5.7800 -140.3100       5.6       151       191        96
WVCT   2025130    131400   -5.7600 -140.6900       5.4        90       161        98
WVCT   2025130    131400   -5.7400 -140.7600       5.3       102       167        88
WVCT   2025130    131400   -5.8400 -132.8100       4.2       124       187        96
WVCT   2025130    131400   -5.9000 -132.9000       7.2       124       180        76
WVCT   2025130    131400   -5.8400 -135.6600       5.1        97       188        68
WVCT   2025130    131400   -5.8700 -135.7600       5.1       113       182        98
WVCT   2025130    131400   -5.8700 -135.7800       5.3       107       181        98
WVCT   2025130    131400   -5.9100 -135.9500       4.5       124       183        91
WVCT   2025130    131400   -5.8700 -135.9800       4.4       129       185        75
WVCT   2025130    131400   -5.8300 -136.1100       6.3        80       190        81
WVCT   2025130    131400   -5.8300 -136.1800       7.5        75       192        97
WVCT   2025130    131400   -5.8500 -136.2700       8.3        74       190        99
WVCT   2025130    131400   -5.8300 -136.3300       7.7        77       182        99
WVCT   2025130    131400   -5.8900 -136.4400       9.2        74       180        99
WVCT   2025130    131400   -5.9100 -136.5600       8.5        76       178        99
WVCT   2025130    131400   -5.8700 -136.6200       6.8        79       174        96
WVCT   2025130    131400   -5.9100 -136.7300       5.4        76       172        92
WVCT   2025130    131400   -5.8900 -136.7800       4.0        71       169        92
WVCT   2025130    131400   -5.8300 -136.9400       4.1       100       159        97
WVCT   2025130    131400   -5.8500 -137.0200       4.6        91       158        84
WVCT   2025130    131400   -5.8500 -137.0900       5.2        75       160        76
WVCT   2025130    131400   -5.8700 -137.4000       6.1        48       208        87
WVCT   2025130    131400   -5.8300 -137.4900       7.9        27       196        93
WVCT   2025130    131400   -5.8300 -137.5800      11.8        19       173        99
WVCT   2025130    131400   -5.9100 -137.6200       9.5        39       178        87
WVCT   2025130    131400   -5.9100 -137.7100      11.0        46       183        95
WVCT   2025130    131400   -5.8900 -137.8500       7.8        20       183       100
WVCT   2025130    131400   -5.9100 -137.8700       8.1        14       183        98
WVCT   2025130    131400   -5.8900 -137.9600       6.8        13       179        99
WVCT   2025130    131400   -5.8300 -138.0700       5.0        33       160        95
WVCT   2025130    131400   -5.9100 -138.1900       4.4        75       157        96
WVCT   2025130    131400   -5.8300 -138.3000       7.8        76       142        99
WVCT   2025130    131400   -5.8700 -138.3600       8.0        77       144        90
WVCT   2025130    131400   -5.8900 -138.4800       6.5        78       143        64
WVCT   2025130    131400   -5.9000 -138.5200       6.1        73       147        67
WVCT   2025130    131400   -5.9000 -138.6500       4.9        48       154        98
WVCT   2025130    131400   -5.9000 -138.6800       5.4        40       162        97
WVCT   2025130    131400   -5.8700 -138.7700       5.5        40       171        98
WVCT   2025130    131400   -5.8300 -138.9400       4.5       357       179        93
WVCT   2025130    131400   -5.8300 -138.9600       4.5       350       177        96
WVCT   2025130    131400   -5.9000 -139.5700       6.9       104       189        77
WVCT   2025130    131400   -5.8700 -139.7100      12.8        87       188        66
WVCT   2025130    131400   -5.8300 -140.0200       9.4       156       185        93
WVCT   2025130    131400   -5.8900 -140.0900       7.4       150       189        96
WVCT   2025130    131400   -5.8300 -140.1500       7.4       158       189        99
WVCT   2025130    131400   -5.9000 -140.2600       5.4       142       194       100
WVCT   2025130    131400   -5.8700 -140.3700       5.4       139       193        99
WVCT   2025130    131400   -5.8900 -140.4000       4.5       135       192        91
WVCT   2025130    131400   -5.8300 -140.7300       5.4        75       162        95
WVCT   2025130    131400   -5.8300 -141.3100       4.6       100       189       100
WVCT   2025130    131400   -5.9300 -132.8200       5.5       125       185        92
WVCT   2025130    131400   -5.9500 -132.9100       8.7       116       185        74
WVCT   2025130    131400   -5.9500 -133.4100       5.2       116       222        66
WVCT   2025130    131400   -5.9300 -135.6900       4.8       117       199        81
WVCT   2025130    131400   -5.9300 -135.7800       5.3       118       189        94
WVCT   2025130    131400   -5.9300 -135.8200       5.2       119       187        88
WVCT   2025130    131400   -5.9300 -135.9100       4.7       127       182        98
WVCT   2025130    131400   -5.9400 -136.0700       5.3        98       191        92
WVCT   2025130    131400   -5.9300 -136.1300       7.3        81       192        89
WVCT   2025130    131400   -6.0000 -136.2200       8.5        77       190        83
WVCT   2025130    131400   -6.0000 -136.2700       7.7        77       188        89
WVCT   2025130    131400   -5.9800 -136.3600       6.8        77       177       100
WVCT   2025130    131400   -5.9600 -136.5300       7.8        75       181        97
WVCT   2025130    131400   -5.9400 -136.5600       7.9        76       179        99
WVCT   2025130    131400   -5.9600 -136.6400       6.7        76       180        95
WVCT   2025130    131400   -5.9400 -136.8000       4.5        64       170        99
WVCT   2025130    131400   -5.9400 -136.8400       4.0        61       169        97
WVCT   2025130    131400   -6.0000 -137.1300       6.0        64       160        60
WVCT   2025130    131400   -6.0000 -137.2000       5.1        67       171        87
WVCT   2025130    131400   -6.0000 -137.3600       5.3        51       184        93
WVCT   2025130    131400   -5.9400 -137.4700       5.3        45       203        98
WVCT   2025130    131400   -5.9400 -137.6200       8.8        50       184        77
WVCT   2025130    131400   -5.9400 -137.6300       9.3        53       183        76
WVCT   2025130    131400   -5.9400 -137.7200      10.4        58       186        79
WVCT   2025130    131400   -5.9600 -137.8900       9.1        10       183        99
WVCT   2025130    131400   -5.9800 -137.9000       8.8         7       182        99
WVCT   2025130    131400   -6.0000 -138.0000       5.7        13       177        99
WVCT   2025130    131400   -5.9800 -138.1400       5.7        78       167        97
WVCT   2025130    131400   -5.9400 -138.2300       6.2        83       158        81
WVCT   2025130    131400   -5.9400 -138.2700       7.3        83       156        81
WVCT   2025130    131400   -5.9600 -138.4300       8.8        76       158        78
WVCT   2025130    131400   -5.9600 -138.4800       7.3        71       160        80
WVCT   2025130    131400   -5.9400 -138.6100       5.1        47       167        96
WVCT   2025130    131400   -5.9400 -138.6300       5.1        41       168        99
WVCT   2025130    131400   -5.9600 -138.7200       6.8        24       181        97
WVCT   2025130    131400   -5.9200 -138.8500       5.7        11       182       100
WVCT   2025130    131400   -5.9400 -138.9400       4.8       342       189        69
WVCT   2025130    131400   -5.9400 -139.5700       8.8       123       190        78
WVCT   2025130    131400   -5.9400 -139.7000      14.1        83       192        78
WVCT   2025130    131400   -5.9200 -139.7100      14.1       101       189        90
WVCT   2025130    131400   -5.9800 -139.9700      10.7       134       210        99
WVCT   2025130    131400   -6.0000 -139.9900      12.1       129       210        98
WVCT   2025130    131400   -5.9200 -140.1300       6.2       146       191        92
WVCT   2025130    131400   -5.9600 -140.1700       5.5       145       194        89
WVCT   2025130    131400   -5.9200 -140.2600       5.2       140       194       100
WVCT   2025130    131400   -5.9200 -140.3700       6.4       134       194        99
WVCT   2025130    131400   -5.9200 -141.3600       5.1        90       218        93
WVCT   2025130    131400   -6.0700 -135.1600       4.5        77       219        94
WVCT   2025130    131400   -6.0500 -136.0200       4.8       132       195        99
WVCT   2025130    131400   -6.0900 -136.1400       7.0        82       189        97
WVCT   2025130    131400   -6.0200 -136.2500       7.9        76       189        87
WVCT   2025130    131400   -6.0200 -136.2700       7.5        77       189        86
WVCT   2025130    131400   -6.0700 -136.4300       5.7        83       175        99
WVCT   2025130    131400   -6.0200 -136.4500       6.9        79       177        98
WVCT   2025130    131400   -6.0200 -136.5400       7.0        78       181        96
WVCT   2025130    131400   -6.0200 -136.6700       6.4        76       181        95
WVCT   2025130    131400   -6.0300 -136.7400       5.8        71       174        99
WVCT   2025130    131400   -6.0900 -136.8500       5.9        61       169       100
WVCT   2025130    131400   -6.0700 -136.9200       5.3        64       167        97
WVCT   2025130    131400   -6.0700 -137.0200       5.0        71       163        93
WVCT   2025130    131400   -6.0200 -137.1400       5.9        60       162        66
WVCT   2025130    131400   -6.0200 -137.2200       4.8        63       172        97
WVCT   2025130    131400   -6.0200 -137.2700       5.2        60       181        97
WVCT   2025130    131400   -6.0300 -137.3600       5.7        52       180        85
WVCT   2025130    131400   -6.0700 -137.4700       5.8        54       170        75
WVCT   2025130    131400   -6.0900 -137.8700       8.0        39       188        87
WVCT   2025130    131400   -6.0100 -137.9600       7.1         9       179        99
WVCT   2025130    131400   -6.0100 -138.0000       5.5        16       178        98
WVCT   2025130    131400   -6.0500 -138.1200       8.5        84       176        98
WVCT   2025130    131400   -6.0900 -138.2500       9.4        80       181        86
WVCT   2025130    131400   -6.0900 -138.2700       9.1        78       181        86
WVCT   2025130    131400   -6.0700 -138.3600       8.0        78       184        98
WVCT   2025130    131400   -6.0300 -138.5200       7.0        62       184        99
WVCT   2025130    131400   -6.0900 -138.6100       8.0        29       190        94
WVCT   2025130    131400   -6.0100 -138.6800       7.8        25       185        99
WVCT   2025130    131400   -6.0100 -138.7900       7.5         9       183        65
WVCT   2025130    131400   -6.0100 -138.8100       7.2         5       183        68
WVCT   2025130    131400   -6.0100 -138.9500       5.1       335       196        66
WVCT   2025130    131400   -6.0700 -139.4200       6.6       199       195        69
WVCT   2025130    131400   -6.0100 -139.5700      10.9       133       194        72
WVCT   2025130    131400   -6.0300 -139.7000      14.0       108       196        89
WVCT   2025130    131400   -6.0500 -139.7100      17.5       130       198        88
WVCT   2025130    131400   -6.0100 -139.9500      11.3       128       213        98
WVCT   2025130    131400   -6.0500 -140.0600      13.4       132       210        81
WVCT   2025130    131400   -6.0900 -140.0800      11.4       131       210        78
WVCT   2025130    131400   -6.0700 -140.2000       4.6       123       204        86
WVCT   2025130    131400   -6.0700 -140.3800       5.0        88       197        83
WVCT   2025130    131400   -6.0100 -141.4100       5.4        81       218        96
WVCT   2025130    131400   -6.1800 -135.0900       4.8        76       216        74
WVCT   2025130    131400   -6.1300 -136.1600       6.7        81       190        97
WVCT   2025130    131400   -6.1100 -136.1800       7.2        79       190        94
WVCT   2025130    131400   -6.1400 -136.3100       5.8        84       191        93
WVCT   2025130    131400   -6.1300 -136.3800       5.7        85       177        99
WVCT   2025130    131400   -6.1400 -136.5100       4.7        96       178        99
WVCT   2025130    131400   -6.1600 -136.5400       4.0       105       179        98
WVCT   2025130    131400   -6.1800 -136.7600       4.7        70       173        93
WVCT   2025130    131400   -6.1600 -136.8900       6.3        63       169        99
WVCT   2025130    131400   -6.1400 -136.9100       6.7        64       168        99
WVCT   2025130    131400   -6.1800 -137.0000       6.3        62       165       100
WVCT   2025130    131400   -6.1600 -137.1600       5.0        18       161        96
WVCT   2025130    131400   -6.1400 -137.2500       5.7        40       164        85
WVCT   2025130    131400   -6.1300 -137.3400       6.4        50       173        99
WVCT   2025130    131400   -6.1200 -137.3600       6.4        50       173        97
WVCT   2025130    131400   -6.1800 -137.4700       5.9        45       176        86
WVCT   2025130    131400   -6.1800 -137.5400       5.3        57       178        76
WVCT   2025130    131400   -6.1800 -137.9000       6.4        54       181        97
WVCT   2025130    131400   -6.1400 -138.0300       5.3        76       182        99
WVCT   2025130    131400   -6.1800 -138.1000       8.7        88       183        87
WVCT   2025130    131400   -6.1400 -138.2500       9.7        73       184        62
WVCT   2025130    131400   -6.1800 -138.2700       9.7        61       185        64
WVCT   2025130    131400   -6.1200 -138.4300       7.3        70       189        94
WVCT   2025130    131400   -6.1100 -138.4500       7.6        71       189        98
WVCT   2025130    131400   -6.1100 -138.5900       7.9        34       191        94
WVCT   2025130    131400   -6.1800 -138.6600      10.1        18       209        99
WVCT   2025130    131400   -6.1600 -138.7700      10.1        13       215       100
WVCT   2025130    131400   -6.1600 -138.8800       7.4       359       218       100
WVCT   2025130    131400   -6.1600 -138.9000       7.1         0       218       100
WVCT   2025130    131400   -6.1600 -139.1400       4.2        33       215        84
WVCT   2025130    131400   -6.1200 -139.4200       4.6       235       196        69
WVCT   2025130    131400   -6.1200 -139.4400       5.1       235       194        60
WVCT   2025130    131400   -6.1200 -139.5500      13.9       162       195        66
WVCT   2025130    131400   -6.1200 -139.6600      16.7       134       198        88
WVCT   2025130    131400   -6.1200 -139.7100      18.4       133       199        77
WVCT   2025130    131400   -6.1400 -139.8200      14.6        24       214        65
WVCT   2025130    131400   -6.1600 -139.9000      12.9        43       215        76
WVCT   2025130    131400   -6.1000 -140.0400      13.9       125       211        80
WVCT   2025130    131400   -6.1200 -140.0900       7.9       114       209        67
WVCT   2025130    131400   -6.1400 -140.1800       5.0        82       206        85
WVCT   2025130    131400   -6.1800 -141.2500       4.1        87       180        90
WVCT   2025130    131400   -6.1000 -141.3400       4.6        84       181       100
WVCT   2025130    131400   -6.2200 -135.0700       5.0        83       210        79
WVCT   2025130    131400   -6.2000 -135.1200       6.0        82       215        84
WVCT   2025130    131400   -6.2700 -135.2000       4.6        95       210        76
WVCT   2025130    131400   -6.2700 -135.3000       4.4        95       205        80
WVCT   2025130    131400   -6.2400 -136.1600       6.0        84       190        92
WVCT   2025130    131400   -6.2400 -136.2000       6.6        83       190        88
WVCT   2025130    131400   -6.2400 -136.3200       6.2        88       191        98
WVCT   2025130    131400   -6.2500 -136.3600       6.4        88       185        99
WVCT   2025130    131400   -6.2000 -136.4900       4.7        99       179        99
WVCT   2025130    131400   -6.2400 -136.8500       4.2        54       171        95
WVCT   2025130    131400   -6.2400 -136.9200       5.4        60       169        88
WVCT   2025130    131400   -6.2700 -137.0000       4.9        59       166        93
WVCT   2025130    131400   -6.2500 -137.0900       5.1        44       163        79
WVCT   2025130    131400   -6.2700 -137.2300       4.4        30       159       100
WVCT   2025130    131400   -6.2000 -137.3200       6.3        43       169        95
WVCT   2025130    131400   -6.2000 -137.4100       5.9        41       176       100
WVCT   2025130    131400   -6.2700 -137.4900       4.7        44       183       100
WVCT   2025130    131400   -6.2500 -137.6700       6.6        54       167        64
WVCT   2025130    131400   -6.2200 -138.0700       7.2        87       183        95
WVCT   2025130    131400   -6.2700 -138.1200       6.8        65       183        99
WVCT   2025130    131400   -6.2500 -138.1700       8.7        71       184        74
WVCT   2025130    131400   -6.2300 -138.3400      10.0        41       189        80
WVCT   2025130    131400   -6.2500 -138.3600      10.1        33       190        82
WVCT   2025130    131400   -6.2300 -138.4500       8.2        38       197        99
WVCT   2025130    131400   -6.2500 -138.6100       7.7        17       209        99
WVCT   2025130    131400   -6.2100 -138.6300       8.3        15       209        97
WVCT   2025130    131400   -6.2700 -138.7400       9.8        15       217        98
WVCT   2025130    131400   -6.2000 -138.8100       9.6        15       217       100
WVCT   2025130    131400   -6.2000 -138.9700       6.2        21       218        74
WVCT   2025130    131400   -6.2100 -139.0400       6.3        38       219        66
WVCT   2025130    131400   -6.2000 -139.1200       6.0        32       217        85
WVCT   2025130    131400   -6.2500 -139.2400      12.7       359       219       100
WVCT   2025130    131400   -6.2700 -139.2600      13.2       356       219       100
WVCT   2025130    131400   -6.2700 -139.4200      16.5       331       194        67
WVCT   2025130    131400   -6.2500 -139.5500      13.2        71       194        92
WVCT   2025130    131400   -6.2700 -139.7300      15.6       359       203        83
WVCT   2025130    131400   -6.2700 -139.8800      12.7        46       209        99
WVCT   2025130    131400   -6.2700 -139.8900      12.9        49       209        99
WVCT   2025130    131400   -6.2700 -140.0600       9.4        51       210        70
WVCT   2025130    131400   -6.2500 -140.1500       7.1        46       209        79
WVCT   2025130    131400   -6.2000 -140.2200       5.7        28       206        93
WVCT   2025130    131400   -6.2500 -140.8000       5.2       110       172        91
WVCT   2025130    131400   -6.2300 -141.2900       6.1        74       176        87
WVCT   2025130    131400   -6.2300 -141.3600       5.4        76       180        99
WVCT   2025130    131400   -6.3100 -134.9600       9.2        79       231        75
WVCT   2025130    131400   -6.3700 -135.0700       7.4       112       210       100
WVCT   2025130    131400   -6.2900 -135.1200       5.9       103       208        78
WVCT   2025130    131400   -6.3100 -135.1900       4.8       104       208        83
WVCT   2025130    131400   -6.3300 -135.2900       6.5        94       205        92
WVCT   2025130    131400   -6.2900 -135.4100       4.2       123       197        63
WVCT   2025130    131400   -6.3500 -135.6000       5.9       103       194        87
WVCT   2025130    131400   -6.3700 -135.6500       9.0        81       190        98
WVCT   2025130    131400   -6.2900 -135.7600       4.5        92       189        77
WVCT   2025130    131400   -6.3600 -135.8500       6.5       123       181        70
WVCT   2025130    131400   -6.3300 -136.1100       6.0        88       186        74
WVCT   2025130    131400   -6.3100 -136.2100       8.6        84       189        92
WVCT   2025130    131400   -6.2900 -136.3200       7.1        86       190        96
WVCT   2025130    131400   -6.3600 -136.4300       8.0        72       180        99
WVCT   2025130    131400   -6.3600 -136.4700       7.2        78       181        96
WVCT   2025130    131400   -6.3600 -136.6000       5.1       101       182        99
WVCT   2025130    131400   -6.3500 -136.7000       4.2        79       178        99
WVCT   2025130    131400   -6.3600 -136.9400       4.6        58       171        80
WVCT   2025130    131400   -6.3400 -137.0100       4.4        65       167        87
WVCT   2025130    131400   -6.3300 -137.3400       4.8        34       160        92
WVCT   2025130    131400   -6.2900 -137.4100       6.2        32       169        92
WVCT   2025130    131400   -6.2900 -137.4900       4.7        43       183       100
WVCT   2025130    131400   -6.3300 -137.5800       4.4        66       184        71
WVCT   2025130    131400   -6.3600 -137.7000       5.9        45       168        68
WVCT   2025130    131400   -6.3600 -137.8800       5.1        70       168        65
WVCT   2025130    131400   -6.2900 -137.9800       5.3        59       174        98
WVCT   2025130    131400   -6.2900 -138.0300       5.2        56       179        98
WVCT   2025130    131400   -6.2900 -138.1200       6.5        56       182        99
WVCT   2025130    131400   -6.2900 -138.2300       8.3        53       185        63
WVCT   2025130    131400   -6.2900 -138.3400      10.5        29       191        78
WVCT   2025130    131400   -6.3100 -138.4300      10.8        24       198       100
WVCT   2025130    131400   -6.3200 -138.4500      10.9        25       198       100
WVCT   2025130    131400   -6.3100 -138.6100       7.3        16       211        98
WVCT   2025130    131400   -6.3200 -138.6300       7.3        17       215        91
WVCT   2025130    131400   -6.2900 -138.7400       9.4        15       218        97
WVCT   2025130    131400   -6.3400 -138.8100       9.2        19       226        98
WVCT   2025130    131400   -6.3400 -138.9200      10.5        13       225       100
WVCT   2025130    131400   -6.2900 -139.0400       8.4        24       222        94
WVCT   2025130    131400   -6.3200 -139.1500      12.4         8       223        75
WVCT   2025130    131400   -6.2900 -139.2300      12.8       359       218        89
WVCT   2025130    131400   -6.3600 -139.2600      10.0       350       217        93
WVCT   2025130    131400   -6.3400 -139.5700      14.3        99       194        97
WVCT   2025130    131400   -6.2900 -139.7900      13.8         6       205        73
WVCT   2025130    131400   -6.2900 -139.8200      12.6        28       206        75
WVCT   2025130    131400   -6.2900 -139.9700      12.2        57       209        66
WVCT   2025130    131400   -6.3400 -140.1300       6.9        63       209        72
WVCT   2025130    131400   -6.3600 -140.1800       7.1        70       208        68
WVCT   2025130    131400   -6.3100 -140.6000       4.2        87       180        82
WVCT   2025130    131400   -6.3200 -140.6200       4.3        88       180        78
WVCT   2025130    131400   -6.2900 -140.8000       5.0       114       177        97
WVCT   2025130    131400   -6.2900 -140.9100       5.1        82       182        71
WVCT   2025130    131400   -6.3400 -141.2000       6.4        71       158        82
WVCT   2025130    131400   -6.3200 -141.3200       8.1        79       168        87
WVCT   2025130    131400   -6.2900 -141.4100       5.3        77       179        90
WVCT   2025130    131400   -6.4600 -132.9200       4.5       119       187        79
WVCT   2025130    131400   -6.3900 -134.7600       4.5       184       233        84
WVCT   2025130    131400   -6.4000 -134.8100       4.4       173       235        94
WVCT   2025130    131400   -6.4000 -135.0500       8.4       109       214       100
WVCT   2025130    131400   -6.4000 -135.1400       6.0       124       208        63
WVCT   2025130    131400   -6.4200 -135.1600       5.9       123       208        63
WVCT   2025130    131400   -6.3800 -135.2700       6.9        96       205        88
WVCT   2025130    131400   -6.3800 -135.3400       7.2       100       204        82
WVCT   2025130    131400   -6.3800 -135.5800       6.2       119       197        83
WVCT   2025130    131400   -6.3800 -135.6500      11.1        74       190        77
WVCT   2025130    131400   -6.4200 -135.7000      10.7        74       189        94
WVCT   2025130    131400   -6.3800 -135.8100       7.9       103       183        68
WVCT   2025130    131400   -6.4600 -135.8900       7.5        85       208       100
WVCT   2025130    131400   -6.4600 -135.9800       5.7        86       207        76
WVCT   2025130    131400   -6.3800 -136.1400       8.7        87       178        96
WVCT   2025130    131400   -6.4600 -136.1800       8.7        95       176        93
WVCT   2025130    131400   -6.4000 -136.2700       9.8        82       174        98
WVCT   2025130    131400   -6.4200 -136.3600       9.8        75       177        98
WVCT   2025130    131400   -6.3800 -136.4700       7.6        76       181        97
WVCT   2025130    131400   -6.4000 -136.5800       5.5        95       183        97
WVCT   2025130    131400   -6.3800 -136.6700       5.2        90       181       100
WVCT   2025130    131400   -6.4400 -136.7600       6.2        65       174        98
WVCT   2025130    131400   -6.4200 -136.8700       6.2        59       171        94
WVCT   2025130    131400   -6.4500 -136.9600       7.3        64       180        95
WVCT   2025130    131400   -6.4500 -136.9800       7.2        64       177        96
WVCT   2025130    131400   -6.4500 -137.1800       5.5        58       170        98
WVCT   2025130    131400   -6.4500 -137.2500       5.6        67       167        95
WVCT   2025130    131400   -6.3800 -137.4100       5.5        46       164        84
WVCT   2025130    131400   -6.4200 -137.5000       5.0        46       168        88
WVCT   2025130    131400   -6.4400 -137.5400       4.8        50       170        90
WVCT   2025130    131400   -6.4000 -137.6100       4.4        53       171        89
WVCT   2025130    131400   -6.4500 -137.7700       5.7        27       170        98
WVCT   2025130    131400   -6.4500 -137.7900       5.7        27       169        91
WVCT   2025130    131400   -6.3800 -138.0500       5.3        37       172        93
WVCT   2025130    131400   -6.3800 -138.1000       5.8        27       173        96
WVCT   2025130    131400   -6.3800 -138.2300       6.9        49       182        80
WVCT   2025130    131400   -6.4200 -138.2800       8.3        45       182        83
WVCT   2025130    131400   -6.3800 -138.3700      11.1        21       198        97
WVCT   2025130    131400   -6.4200 -138.5000       9.1        22       198        76
WVCT   2025130    131400   -6.3800 -138.5200       8.5        23       200        90
WVCT   2025130    131400   -6.3800 -138.6800       6.5        22       227        81
WVCT   2025130    131400   -6.3800 -138.7000       6.7        20       226        82
WVCT   2025130    131400   -6.4000 -138.8600      10.3         7       225        99
WVCT   2025130    131400   -6.4000 -138.9500      12.5         1       224       100
WVCT   2025130    131400   -6.4200 -139.0400      14.1       353       223        98
WVCT   2025130    131400   -6.4000 -139.0600      14.0       357       223        96
WVCT   2025130    131400   -6.4500 -139.2200      10.8       349       213        90
WVCT   2025130    131400   -6.3800 -139.2600       9.4       349       214        95
WVCT   2025130    131400   -6.3800 -139.4100       8.2       309       194        60
WVCT   2025130    131400   -6.4300 -139.4200       8.6       339       194        93
WVCT   2025130    131400   -6.3800 -139.5700      15.6       109       194        94
WVCT   2025130    131400   -6.4200 -139.6600      14.7       125       195        77
WVCT   2025130    131400   -6.3800 -139.8900       9.5        67       201        78
WVCT   2025130    131400   -6.4500 -140.0600       6.3        64       207        79
WVCT   2025130    131400   -6.4200 -140.0900       7.1        73       208        80
WVCT   2025130    131400   -6.4300 -140.2200       5.5        69       209        82
WVCT   2025130    131400   -6.3800 -140.5600       5.3        72       181        61
WVCT   2025130    131400   -6.4000 -141.2200       9.2        82       156        71
WVCT   2025130    131400   -6.4500 -141.3400       7.6        99       162        93
WVCT   2025130    131400   -6.4500 -141.3800       6.0       107       162        79
WVCT   2025130    131400   -6.5600 -133.0100       4.8        99       194        95
WVCT   2025130    131400   -6.4800 -134.8500       5.7       172       235        80
WVCT   2025130    131400   -6.4900 -134.9000       6.1       154       230        62
WVCT   2025130    131400   -6.4800 -135.6500       9.7        68       214       100
WVCT   2025130    131400   -6.5300 -135.8700      10.3        60       217       100
WVCT   2025130    131400   -6.5300 -135.9000       8.3        61       217       100
WVCT   2025130    131400   -6.5500 -135.9800       4.2        91       209        75
WVCT   2025130    131400   -6.4900 -136.1000       6.5        94       193        80
WVCT   2025130    131400   -6.4900 -136.1600       7.4        96       178        92
WVCT   2025130    131400   -6.5100 -136.3200      10.0        75       201       100
WVCT   2025130    131400   -6.4700 -136.3400      10.2        75       198        99
WVCT   2025130    131400   -6.4900 -136.4900       9.7        74       199        97
WVCT   2025130    131400   -6.5300 -136.5200       8.9        79       199        97
WVCT   2025130    131400   -6.5500 -136.6700       6.1        78       179        99
WVCT   2025130    131400   -6.4700 -136.7800       7.2        65       179        90
WVCT   2025130    131400   -6.4900 -136.8700       8.3        64       191        86
WVCT   2025130    131400   -6.4900 -136.9200       8.4        64       191        93
WVCT   2025130    131400   -6.5500 -137.0100       8.9        62       190        99
WVCT   2025130    131400   -6.4900 -137.0800       6.5        62       174        99
WVCT   2025130    131400   -6.4900 -137.1800       6.5        60       172        93
WVCT   2025130    131400   -6.5500 -137.2800       7.3        72       171        95
WVCT   2025130    131400   -6.5100 -137.3400       6.2        79       165        85
WVCT   2025130    131400   -6.4700 -137.5000       5.1        47       168        87
WVCT   2025130    131400   -6.5100 -137.5600       5.2        45       173        86
WVCT   2025130    131400   -6.4700 -137.6300       4.9        43       173        99
WVCT   2025130    131400   -6.5400 -137.7400       5.5        31       172        98
WVCT   2025130    131400   -6.5400 -137.7900       5.5        29       172        83
WVCT   2025130    131400   -6.4700 -138.1400       4.9         5       172        98
WVCT   2025130    131400   -6.4700 -138.1600       4.6        12       172        96
WVCT   2025130    131400   -6.4700 -138.3000       6.6        16       175        88
WVCT   2025130    131400   -6.4700 -138.3400       7.0        11       176        92
WVCT   2025130    131400   -6.4700 -138.4600       8.5        27       196        90
WVCT   2025130    131400   -6.4900 -138.5900       5.0        41       225        68
WVCT   2025130    131400   -6.5400 -138.6800       4.8        63       224        73
WVCT   2025130    131400   -6.5100 -138.7200       5.3        58       224        69
WVCT   2025130    131400   -6.5400 -138.9000      11.8       356       216        82
WVCT   2025130    131400   -6.5300 -139.0300      14.8       347       218        98
WVCT   2025130    131400   -6.5400 -139.0800      15.5       351       217        98
WVCT   2025130    131400   -6.4700 -139.2200      10.2       348       213        92
WVCT   2025130    131400   -6.5400 -139.2400       5.6       337       214        77
WVCT   2025130    131400   -6.4900 -139.4100       8.7       357       194        83
WVCT   2025130    131400   -6.5200 -139.4400       9.4        21       194        95
WVCT   2025130    131400   -6.5400 -139.5700      13.3        96       195        98
WVCT   2025130    131400   -6.4700 -139.6400      13.1       128       197        80
WVCT   2025130    131400   -6.5100 -139.7100       7.2       140       197        80
WVCT   2025130    131400   -6.5200 -139.9500       5.5        59       202        63
WVCT   2025130    131400   -6.5100 -140.0200       6.4        52       203        64
WVCT   2025130    131400   -6.5100 -140.0600       6.3        48       208        73
WVCT   2025130    131400   -6.4900 -140.2000       6.2        52       210        85
WVCT   2025130    131400   -6.5400 -140.3100       6.0        27       194        92
WVCT   2025130    131400   -6.5400 -140.3500       4.6        28       193        83
WVCT   2025130    131400   -6.5400 -140.5100       5.0        64       185        88
WVCT   2025130    131400   -6.5200 -140.6000       4.7        58       185        65
WVCT   2025130    131400   -6.5100 -140.8400       4.7         9       175        93
WVCT   2025130    131400   -6.4900 -140.9400       5.5        10       164        99
WVCT   2025130    131400   -6.4700 -140.9600       5.4        11       164        99
WVCT   2025130    131400   -6.5200 -141.2000       6.7        99       159        66
WVCT   2025130    131400   -6.5200 -141.3100       6.2        99       167        86
WVCT   2025130    131400   -6.4700 -141.3600       6.6       103       163        92
WVCT   2025130    131400   -6.6000 -135.3000      10.0        48       221        62
WVCT   2025130    131400   -6.6200 -135.7600      10.1        43       214        96
WVCT   2025130    131400   -6.6000 -135.8800       9.6        54       219        80
WVCT   2025130    131400   -6.5800 -136.0800       4.1       109       208       100
WVCT   2025130    131400   -6.5700 -136.1200       4.9       101       208        96
WVCT   2025130    131400   -6.5800 -136.2800       7.6        83       200        94
WVCT   2025130    131400   -6.6000 -136.3600       9.6        73       202       100
WVCT   2025130    131400   -6.6400 -136.3900      10.4        71       202        98
WVCT   2025130    131400   -6.6400 -136.5600       9.7        73       197        79
WVCT   2025130    131400   -6.6400 -136.5700       9.7        72       196        80
WVCT   2025130    131400   -6.6400 -136.6700       8.2        68       192        99
WVCT   2025130    131400   -6.5600 -136.8300       9.6        67       191        85
WVCT   2025130    131400   -6.5800 -136.9000      10.4        69       193        93
WVCT   2025130    131400   -6.6000 -136.9700       9.6        67       191        99
WVCT   2025130    131400   -6.5800 -137.0300       8.6        60       184        99
WVCT   2025130    131400   -6.6400 -137.1600       5.5        58       175        80
WVCT   2025130    131400   -6.5600 -137.2500       6.9        67       172        96
WVCT   2025130    131400   -6.6200 -137.3700       5.0        70       172        97
WVCT   2025130    131400   -6.5800 -137.3900       5.1        73       169        94
WVCT   2025130    131400   -6.6200 -137.5400       4.1        40       173        84
WVCT   2025130    131400   -6.5800 -137.6100       5.5        37       173        88
WVCT   2025130    131400   -6.6200 -137.7000       5.9        38       174        98
WVCT   2025130    131400   -6.5600 -137.7600       5.6        29       172        97
WVCT   2025130    131400   -6.6400 -137.8500       6.7        21       173        65
WVCT   2025130    131400   -6.5600 -138.1000       9.5       307       174        92
WVCT   2025130    131400   -6.5600 -138.1500       8.5       314       174        95
WVCT   2025130    131400   -6.5600 -138.6400       4.7        66       224        72
WVCT   2025130    131400   -6.5600 -138.6800       5.1        62       224        73
WVCT   2025130    131400   -6.6000 -138.7700       5.4        51       215        66
WVCT   2025130    131400   -6.6300 -138.8600       6.9        13       189        99
WVCT   2025130    131400   -6.6200 -139.0100      12.6       356       210        99
WVCT   2025130    131400   -6.6000 -139.0800      12.7       353       213        99
WVCT   2025130    131400   -6.5800 -139.1300      12.5       351       214        93
WVCT   2025130    131400   -6.5600 -139.2600       4.2       324       207        70
WVCT   2025130    131400   -6.5600 -139.4400       9.4        18       194        65
WVCT   2025130    131400   -6.5800 -139.8000       4.1        74       202        63
WVCT   2025130    131400   -6.5600 -140.1100       4.0        32       211        62
WVCT   2025130    131400   -6.6000 -140.2400       5.4        20       203        88
WVCT   2025130    131400   -6.6200 -140.3500       5.6        29       186        84
WVCT   2025130    131400   -6.6300 -140.4400       7.3        31       186        84
WVCT   2025130    131400   -6.5600 -140.5100       5.2        60       186        96
WVCT   2025130    131400   -6.6300 -140.6400       6.7        21       184        83
WVCT   2025130    131400   -6.6300 -140.6500       6.6        18       184        91
WVCT   2025130    131400   -6.6300 -140.8000       5.3        19       169       100
WVCT   2025130    131400   -6.6300 -140.8900       4.1        32       165        98
WVCT   2025130    131400   -6.6200 -141.0000       4.1        26       163        84
WVCT   2025130    131400   -6.6300 -141.1100       4.4        41       162        61
WVCT   2025130    131400   -6.7100 -135.3500       4.2       105       225        61
WVCT   2025130    131400   -6.6600 -135.4600      18.6        36       231        77
WVCT   2025130    131400   -6.7100 -135.8100       4.5       134       218       100
WVCT   2025130    131400   -6.7100 -135.9400      11.7       135       218        61
WVCT   2025130    131400   -6.7300 -136.1000       8.4        45       200        93
WVCT   2025130    131400   -6.7300 -136.2100       8.0        53       199        93
WVCT   2025130    131400   -6.6600 -136.3000       7.8        73       200        85
WVCT   2025130    131400   -6.6600 -136.3900      10.3        72       201        96
WVCT   2025130    131400   -6.7300 -136.5200      10.1        74       198        91
WVCT   2025130    131400   -6.6600 -136.6100       9.7        69       193        83
WVCT   2025130    131400   -6.7300 -136.7000      10.6        61       191       100
WVCT   2025130    131400   -6.6600 -136.7600       9.9        64       177        99
WVCT   2025130    131400   -6.7300 -136.8800       9.0        73       180        92
WVCT   2025130    131400   -6.6900 -136.9400       9.2        72       184        97
WVCT   2025130    131400   -6.6600 -137.0100       8.2        65       184        96
WVCT   2025130    131400   -6.7300 -137.1200       5.9        66       176        70
WVCT   2025130    131400   -6.7300 -137.1700       4.7        63       176        88
WVCT   2025130    131400   -6.6900 -137.2600       5.2        65       175        94
WVCT   2025130    131400   -6.7100 -137.3700       5.7        70       175        96
WVCT   2025130    131400   -6.6700 -137.6800       5.9        40       174        94
WVCT   2025130    131400   -6.6900 -137.7400       5.6        35       174       100
WVCT   2025130    131400   -6.6900 -137.8600       7.1        18       174        67
WVCT   2025130    131400   -6.6900 -137.9200       7.9        20       175        70
WVCT   2025130    131400   -6.7300 -138.0300       9.3       355       179        90
WVCT   2025130    131400   -6.7300 -138.1500      11.7       335       179        70
WVCT   2025130    131400   -6.6500 -138.8800       7.0         7       189        96
WVCT   2025130    131400   -6.6900 -139.0200      11.4       359       209        99
WVCT   2025130    131400   -6.6500 -139.0800      12.9       357       210       100
WVCT   2025130    131400   -6.6500 -139.1700       7.3       339       214        86
WVCT   2025130    131400   -6.7100 -139.2800       4.9       287       213        86
WVCT   2025130    131400   -6.6700 -139.4800      10.2        76       196        95
WVCT   2025130    131400   -6.7300 -139.8600      11.7        45       199        66
WVCT   2025130    131400   -6.6700 -139.8900       9.9        57       204        78
WVCT   2025130    131400   -6.6700 -140.1300       4.0        24       206        72
WVCT   2025130    131400   -6.6700 -140.2900       4.7        31       185        92
WVCT   2025130    131400   -6.6500 -140.3500       6.0        27       185        90
WVCT   2025130    131400   -6.6500 -140.4600       8.1        27       186        80
WVCT   2025130    131400   -6.7300 -140.5800       9.9        26       185        74
WVCT   2025130    131400   -6.6500 -140.6700       6.9        15       182        94
WVCT   2025130    131400   -6.6900 -140.6900       7.7        15       182        99
WVCT   2025130    131400   -6.6700 -140.8400       4.8        29       166        98
WVCT   2025130    131400   -6.6500 -140.8700       4.2        30       165        97
WVCT   2025130    131400   -6.6500 -141.0900       4.2        35       162        64
WVCT   2025130    131400   -6.6500 -141.3600       4.3        88       182        92
WVCT   2025130    131400   -6.8100 -132.8600       4.0       102       219        90
WVCT   2025130    131400   -6.8100 -132.8800       4.1       102       218        92
WVCT   2025130    131400   -6.8100 -133.0300       4.1       119       215        95
WVCT   2025130    131400   -6.8300 -133.4900       4.7       106       221        82
WVCT   2025130    131400   -6.7700 -133.5600       5.6       115       223        81
WVCT   2025130    131400   -6.7700 -133.6200       5.6       117       229        83
WVCT   2025130    131400   -6.7500 -135.3700       4.4        99       225        62
WVCT   2025130    131400   -6.8200 -135.4100       4.5        97       232        62
WVCT   2025130    131400   -6.7900 -135.5900      13.8       118       236        67
WVCT   2025130    131400   -6.8200 -135.8400      10.2       144       220        98
WVCT   2025130    131400   -6.8200 -135.9200      12.4       146       218        98
WVCT   2025130    131400   -6.8200 -135.9900       8.0       139       206        83
WVCT   2025130    131400   -6.7500 -136.1200       8.8        45       199        98
WVCT   2025130    131400   -6.7500 -136.1400       8.9        46       199        97
WVCT   2025130    131400   -6.8000 -136.2800      10.9        58       198        88
WVCT   2025130    131400   -6.7500 -136.3900      11.4        69       199        95
WVCT   2025130    131400   -6.7700 -136.4800      12.3        68       199        86
WVCT   2025130    131400   -6.7700 -136.5000      11.4        69       198        94
WVCT   2025130    131400   -6.7500 -136.6100      10.4        70       195        86
WVCT   2025130    131400   -6.7500 -136.6800      10.5        64       193       100
WVCT   2025130    131400   -6.8200 -136.7700       9.3        58       181        96
WVCT   2025130    131400   -6.7700 -136.9200       8.0        73       179        94
WVCT   2025130    131400   -6.7500 -136.9600       8.4        71       177        98
WVCT   2025130    131400   -6.7500 -137.1000       6.4        68       177        66
WVCT   2025130    131400   -6.8000 -137.1500       7.9        63       180        68
WVCT   2025130    131400   -6.8200 -137.2600       6.2        63       180        97
WVCT   2025130    131400   -6.7800 -137.3400       5.8        66       178        99
WVCT   2025130    131400   -6.8000 -137.4100       4.8        68       176        96
WVCT   2025130    131400   -6.7600 -137.6600       5.5        44       173        82
WVCT   2025130    131400   -6.8000 -137.7500       5.9        28       174       100
WVCT   2025130    131400   -6.8000 -137.7700       5.9        25       174       100
WVCT   2025130    131400   -6.7600 -137.9000       7.6        17       175        97
WVCT   2025130    131400   -6.7800 -138.0300       9.6         2       180       100
WVCT   2025130    131400   -6.8200 -138.1000       9.5         5       181        96
WVCT   2025130    131400   -6.7800 -138.1400       9.5       355       180        88
WVCT   2025130    131400   -6.7800 -138.2400       8.0        79       184        78
WVCT   2025130    131400   -6.7800 -139.0100       6.1         9       194        98
WVCT   2025130    131400   -6.8200 -139.1300       5.4       350       208        91
WVCT   2025130    131400   -6.7400 -139.2800       6.7       303       211        84
WVCT   2025130    131400   -6.7400 -139.5000      12.7        87       201        82
WVCT   2025130    131400   -6.8000 -139.7500       9.6        52       198        86
WVCT   2025130    131400   -6.7400 -139.7900      11.2        48       198        64
WVCT   2025130    131400   -6.8000 -139.9100       7.9        57       199        64
WVCT   2025130    131400   -6.8000 -140.0400       4.6        82       223        77
WVCT   2025130    131400   -6.8200 -140.3800       5.4        10       185        82
WVCT   2025130    131400   -6.8200 -140.4600       7.5        13       184        97
WVCT   2025130    131400   -6.7400 -140.5800      10.2        26       185        76
WVCT   2025130    131400   -6.7600 -140.6400       9.3        27       184        85
WVCT   2025130    131400   -6.8200 -140.7300       7.4        25       176        96
WVCT   2025130    131400   -6.7800 -140.8000       7.2        18       169        98
WVCT   2025130    131400   -6.8000 -140.9400       4.5        49       168        93
WVCT   2025130    131400   -6.8500 -132.8600       4.0       100       218        89
WVCT   2025130    131400   -6.8700 -132.8800       4.1        97       218        91
WVCT   2025130    131400   -6.8800 -133.0400       4.4       115       203        89
WVCT   2025130    131400   -6.9200 -133.1200       4.5       118       204        85
WVCT   2025130    131400   -6.9200 -133.1500       4.3       124       205        82
WVCT   2025130    131400   -6.9200 -133.4700       5.5       115       217        73
WVCT   2025130    131400   -6.8800 -135.5200       7.3       119       238        87
WVCT   2025130    131400   -6.8800 -135.5700      11.4       115       236        87
WVCT   2025130    131400   -6.8400 -135.7000      10.8       109       226        92
WVCT   2025130    131400   -6.9100 -135.7500       9.2        97       224        98
WVCT   2025130    131400   -6.9000 -135.8800      10.4       127       230        93
WVCT   2025130    131400   -6.8400 -135.9200      12.3       145       219        98
WVCT   2025130    131400   -6.8400 -136.2600       8.7        62       198        98
WVCT   2025130    131400   -6.8400 -136.3000      10.2        64       198        90
WVCT   2025130    131400   -6.8400 -136.6300      12.3        61       195        88
WVCT   2025130    131400   -6.9100 -136.7200      11.2        48       181        96
WVCT   2025130    131400   -6.9100 -136.7900      11.5        48       182        96
WVCT   2025130    131400   -6.8400 -136.9000       6.6        71       183        83
WVCT   2025130    131400   -6.8600 -136.9700       8.0        70       180        93
WVCT   2025130    131400   -6.8600 -137.0800       9.4        65       180        71
WVCT   2025130    131400   -6.8400 -137.1700       7.9        62       180        69
WVCT   2025130    131400   -6.8700 -137.2100       7.3        60       183        67
WVCT   2025130    131400   -6.9100 -137.3200       5.6        53       177        85
WVCT   2025130    131400   -6.8700 -137.4100       4.5        58       176       100
WVCT   2025130    131400   -6.8600 -137.5400       4.1        61       174        93
WVCT   2025130    131400   -6.8600 -137.6100       5.6        60       173        79
WVCT   2025130    131400   -6.9100 -137.6600       6.5        42       173        75
WVCT   2025130    131400   -6.8400 -137.7900       6.0        24       173        99
WVCT   2025130    131400   -6.8900 -137.8400       6.4        15       173        89
WVCT   2025130    131400   -6.8400 -137.9400       7.1        14       176       100
WVCT   2025130    131400   -6.9100 -138.0800       8.8        12       184       100
WVCT   2025130    131400   -6.8700 -138.1000       9.1        12       183        99
WVCT   2025130    131400   -6.8900 -139.2800       8.6       344       198        70
WVCT   2025130    131400   -6.8700 -139.3000       9.5       344       197        63
WVCT   2025130    131400   -6.9100 -139.3900      13.0        58       195        94
WVCT   2025130    131400   -6.8900 -139.4800      15.7        80       200        93
WVCT   2025130    131400   -6.8500 -139.6000       6.5        71       201       100
WVCT   2025130    131400   -6.9100 -139.7300       5.9        53       200        89
WVCT   2025130    131400   -6.9100 -139.8200       8.7        54       200        86
WVCT   2025130    131400   -6.9100 -139.8400       7.5        60       200        88
WVCT   2025130    131400   -6.8400 -139.9300       7.6        60       199        67
WVCT   2025130    131400   -6.8400 -140.0200       5.1        75       222        82
WVCT   2025130    131400   -6.8500 -140.1700       4.5        51       223        86
WVCT   2025130    131400   -6.8700 -140.2400       5.2        52       221        76
WVCT   2025130    131400   -6.9100 -140.3600       5.6        28       190        65
WVCT   2025130    131400   -6.9100 -140.3800       5.6        23       189        66
WVCT   2025130    131400   -6.8700 -140.4700       6.0        25       182        61
WVCT   2025130    131400   -6.9100 -140.5600       6.3        42       181        70
WVCT   2025130    131400   -6.9100 -140.7100       6.8        52       178        74
WVCT   2025130    131400   -6.8400 -140.7500       6.8        29       173        90
WVCT   2025130    131400   -6.8900 -140.8900       4.7        61       172        97
WVCT   2025130    131400   -6.8700 -140.9400       4.0        77       175        92
WVCT   2025130    131400   -7.0000 -132.9500       4.2        87       214        90
WVCT   2025130    131400   -6.9400 -133.0100       4.4        99       205        83
WVCT   2025130    131400   -6.9400 -133.1500       4.2       123       205        82
WVCT   2025130    131400   -6.9600 -133.4300       5.7       115       217        78
WVCT   2025130    131400   -6.9700 -135.0900       4.0       173       228        73
WVCT   2025130    131400   -6.9900 -135.2600       5.4       180       227        97
WVCT   2025130    131400   -6.9300 -135.4600       5.2       115       236        67
WVCT   2025130    131400   -7.0100 -135.5000      10.1       116       233        98
WVCT   2025130    131400   -6.9700 -135.6100      11.5       102       233        72
WVCT   2025130    131400   -6.9500 -135.7000      10.0       100       225        88
WVCT   2025130    131400   -6.9700 -135.8100       7.5       107       231        97
WVCT   2025130    131400   -6.9700 -135.9200      10.3       120       233        99
WVCT   2025130    131400   -7.0100 -135.9300       9.9       117       233        98
WVCT   2025130    131400   -6.9900 -136.1000       7.5       109       197        92
WVCT   2025130    131400   -7.0000 -136.1200       7.1       106       198        86
WVCT   2025130    131400   -7.0000 -136.2300       4.0       111       196        72
WVCT   2025130    131400   -7.0000 -136.6300       5.5        97       183        83
WVCT   2025130    131400   -6.9300 -136.7200      11.0        45       181        94
WVCT   2025130    131400   -7.0000 -136.7700      10.8        44       184        95
WVCT   2025130    131400   -7.0000 -136.8400      11.9        44       184        95
WVCT   2025130    131400   -6.9300 -136.9400       8.5        61       185        89
WVCT   2025130    131400   -6.9800 -137.0300      10.8        64       188       100
WVCT   2025130    131400   -6.9300 -137.1900       8.2        60       183        64
WVCT   2025130    131400   -6.9800 -137.2400       5.2        59       184        65
WVCT   2025130    131400   -6.9300 -137.3700       4.4        48       175        96
WVCT   2025130    131400   -6.9300 -137.3900       4.4        45       175        98
WVCT   2025130    131400   -6.9500 -137.4800       4.9        30       176        94
WVCT   2025130    131400   -6.9300 -137.6400       6.3        41       175        73
WVCT   2025130    131400   -6.9700 -137.7200       6.6        30       173        86
WVCT   2025130    131400   -6.9800 -137.7500       6.4        32       175        91
WVCT   2025130    131400   -6.9700 -137.8400       6.4        17       171        98
WVCT   2025130    131400   -7.0000 -138.0100       5.8        13       178        97
WVCT   2025130    131400   -6.9300 -138.0800       8.5        12       183        99
WVCT   2025130    131400   -7.0000 -138.1200       8.6        11       184        72
WVCT   2025130    131400   -6.9800 -138.2100       9.4        18       185        65
WVCT   2025130    131400   -6.9300 -139.3900      11.7        54       195        95
WVCT   2025130    131400   -7.0000 -139.5100       9.4        62       207        84
WVCT   2025130    131400   -7.0000 -139.5300       8.1        54       217        74
WVCT   2025130    131400   -6.9500 -139.6900       6.2        38       202        99
WVCT   2025130    131400   -6.9300 -139.7100       6.0        46       201        99
WVCT   2025130    131400   -6.9300 -139.8400       7.3        60       201        86
WVCT   2025130    131400   -6.9800 -140.1500       4.3        36       226        76
WVCT   2025130    131400   -6.9300 -140.2400       5.6        41       226        82
WVCT   2025130    131400   -6.9800 -140.2700       5.2        52       224        77
WVCT   2025130    131400   -6.9600 -140.4200       5.7        25       189        65
WVCT   2025130    131400   -6.9600 -140.4400       5.7        26       188        65
WVCT   2025130    131400   -6.9500 -140.5800       6.1        50       182        68
WVCT   2025130    131400   -6.9600 -140.6200       5.9        53       183        70
WVCT   2025130    131400   -7.0000 -140.7500       6.3        64       203        76
WVCT   2025130    131400   -7.0000 -140.8400       6.0        63       175        79
WVCT   2025130    131400   -7.0000 -140.8900       4.7        58       175        82
WVCT   2025130    131400   -7.0300 -132.8600       4.2        86       208        78
WVCT   2025130    131400   -7.1100 -132.8900       4.0        94       218        83
WVCT   2025130    131400   -7.0400 -134.9700       4.5       171       234        94
WVCT   2025130    131400   -7.1000 -135.0700       6.5       172       231        97
WVCT   2025130    131400   -7.0600 -135.1700       5.8       166       227       100
WVCT   2025130    131400   -7.0200 -135.2400       6.4       180       227        96
WVCT   2025130    131400   -7.0600 -135.3300       8.0       203       229        71
WVCT   2025130    131400   -7.0200 -135.5100      13.4       113       233        84
WVCT   2025130    131400   -7.0200 -135.5700      10.6       111       234        83
WVCT   2025130    131400   -7.0200 -135.7300       8.0       111       231        94
WVCT   2025130    131400   -7.0800 -135.8200       5.1       124       233        67
WVCT   2025130    131400   -7.0200 -135.9000       8.7       116       233        97
WVCT   2025130    131400   -7.0800 -136.0100       8.3       112       233        94
WVCT   2025130    131400   -7.0200 -136.0600       9.0       112       227        98
WVCT   2025130    131400   -7.0200 -136.1200       7.4       107       215        96
WVCT   2025130    131400   -7.0600 -136.3500       4.7       134       198        62
WVCT   2025130    131400   -7.0400 -136.3900       5.9       132       196        68
WVCT   2025130    131400   -7.0200 -136.4800       9.3       118       195        63
WVCT   2025130    131400   -7.0200 -136.6400       5.4       103       188        61
WVCT   2025130    131400   -7.1000 -136.7300       6.5        88       198        72
WVCT   2025130    131400   -7.0400 -136.8300      11.1        49       186        86
WVCT   2025130    131400   -7.0200 -136.8400      11.9        47       186        92
WVCT   2025130    131400   -7.0200 -136.9900      11.0        66       196       100
WVCT   2025130    131400   -7.0600 -137.1000      10.4        68       188        98
WVCT   2025130    131400   -7.0200 -137.1900       6.5        62       185        76
WVCT   2025130    131400   -7.0900 -137.4800       5.2        45       184        96
WVCT   2025130    131400   -7.0800 -137.5900       6.5        35       193        99
WVCT   2025130    131400   -7.0800 -137.6800       6.8         4       194        91
WVCT   2025130    131400   -7.0900 -137.7500       6.5         5       194        86
WVCT   2025130    131400   -7.0200 -137.9000       5.3        25       177       100
WVCT   2025130    131400   -7.0600 -137.9900       5.6        13       185        93
WVCT   2025130    131400   -7.0700 -138.0400       6.9         7       184        82
WVCT   2025130    131400   -7.0900 -138.1300       8.5        12       181        70
WVCT   2025130    131400   -7.0900 -138.3300       6.3       102       188        81
WVCT   2025130    131400   -7.0900 -139.3300       5.2        63       201        97
WVCT   2025130    131400   -7.0700 -139.4800       6.6        80       203        99
WVCT   2025130    131400   -7.0600 -139.5100       6.5        60       205        87
WVCT   2025130    131400   -7.0900 -139.6000       5.0        35       210        69
WVCT   2025130    131400   -7.0200 -139.7500       8.3        42       220        93
WVCT   2025130    131400   -7.0400 -139.8000       8.3        43       224       100
WVCT   2025130    131400   -7.0900 -139.8800       4.7        30       224        99
WVCT   2025130    131400   -7.0200 -140.2900       5.1        58       204        72
WVCT   2025130    131400   -7.0900 -140.3100       4.3        94       204        65
WVCT   2025130    131400   -7.0900 -140.6200       6.2        32       203        97
WVCT   2025130    131400   -7.0200 -140.7500       5.9        60       211        78
WVCT   2025130    131400   -7.0200 -140.7600       5.7        60       208        76
WVCT   2025130    131400   -7.0200 -140.8700       5.1        57       175        85
WVCT   2025130    131400   -7.0900 -141.0900       5.5        72       184        66
WVCT   2025130    131400   -7.1800 -132.8600       5.1       103       217        88
WVCT   2025130    131400   -7.1600 -132.9500       4.4       108       220        99
WVCT   2025130    131400   -7.2000 -132.9700       4.7       107       216        98
WVCT   2025130    131400   -7.1900 -134.8400       4.5       157       261        99
WVCT   2025130    131400   -7.1900 -134.8500       4.7       158       262        99
WVCT   2025130    131400   -7.1400 -134.9800       6.2       172       243       100
WVCT   2025130    131400   -7.1200 -135.0700       6.8       173       233        96
WVCT   2025130    131400   -7.1200 -135.1800       6.5       167       228        98
WVCT   2025130    131400   -7.1300 -135.2900       8.5       184       227        78
WVCT   2025130    131400   -7.1200 -135.6000       9.9       129       236        90
WVCT   2025130    131400   -7.1200 -135.6200       9.8       132       236        88
WVCT   2025130    131400   -7.1200 -135.7100       8.5       140       235        86
WVCT   2025130    131400   -7.1500 -135.8800       6.1       120       240        86
WVCT   2025130    131400   -7.1100 -135.9700       7.7       115       236        90
WVCT   2025130    131400   -7.1700 -136.0400       5.6       120       233        86
WVCT   2025130    131400   -7.1100 -136.1100       5.1       115       229        98
WVCT   2025130    131400   -7.1100 -136.1900       4.8       107       222        97
WVCT   2025130    131400   -7.1100 -136.3300       5.1       112       202       100
WVCT   2025130    131400   -7.1300 -136.3900       6.3       112       206        98
WVCT   2025130    131400   -7.1500 -136.4600       7.8       110       218        92
WVCT   2025130    131400   -7.1700 -136.5700       7.9        97       217        71
WVCT   2025130    131400   -7.1700 -136.6400       7.7        88       216        64
WVCT   2025130    131400   -7.1100 -136.7500       6.7        87       199        75
WVCT   2025130    131400   -7.1500 -136.8400       5.7        78       193        87
WVCT   2025130    131400   -7.1500 -136.9500       8.8        71       193        99
WVCT   2025130    131400   -7.1300 -136.9900      10.4        70       192       100
WVCT   2025130    131400   -7.1500 -137.1300       9.1        61       186        92
WVCT   2025130    131400   -7.1700 -137.2200       5.4        48       185        75
WVCT   2025130    131400   -7.1700 -137.5500       5.1        57       198        99
WVCT   2025130    131400   -7.1300 -137.7000       5.9        12       195        89
WVCT   2025130    131400   -7.1100 -137.7700       6.0         9       194        86
WVCT   2025130    131400   -7.1100 -137.8100       5.6        30       194        68
WVCT   2025130    131400   -7.1500 -137.9300       5.4        17       191        94
WVCT   2025130    131400   -7.1100 -138.0600       7.5         8       186        76
WVCT   2025130    131400   -7.1300 -138.1300       7.9        13       186        73
WVCT   2025130    131400   -7.1100 -139.4200       6.7        95       201        93
WVCT   2025130    131400   -7.1100 -139.4900       5.2        79       205        99
WVCT   2025130    131400   -7.1800 -139.6200       4.5        64       214        93
WVCT   2025130    131400   -7.1300 -139.6600       5.8        39       213        82
WVCT   2025130    131400   -7.1800 -139.7500       5.5        50       225        83
WVCT   2025130    131400   -7.1600 -139.8900       4.5        18       231        84
WVCT   2025130    131400   -7.1800 -139.9100       4.4        12       232        81
WVCT   2025130    131400   -7.1100 -140.2700       4.0       121       205        92
WVCT   2025130    131400   -7.1300 -140.3600       4.6       113       203        80
WVCT   2025130    131400   -7.1100 -140.6000       6.7        34       201        66
WVCT   2025130    131400   -7.1100 -140.6400       6.4        33       203        92
WVCT   2025130    131400   -7.1800 -140.7800       5.1        40       227        75
WVCT   2025130    131400   -7.1300 -140.8500       4.3        54       227        85
WVCT   2025130    131400   -7.1800 -140.9800       7.6        72       232        69
WVCT   2025130    131400   -7.1100 -141.0700       7.9        73       185        64
WVCT   2025130    131400   -7.1800 -141.1600       6.7        15       188        70
WVCT   2025130    131400   -7.1800 -141.2000       6.3         1       224        63
WVCT   2025130    131400   -7.1600 -141.4300       4.2        28       220        66
WVCT   2025130    131400   -7.2500 -132.8200       4.5       108       209        96
WVCT   2025130    131400   -7.2200 -132.9500       4.7       106       216        98
WVCT   2025130    131400   -7.2200 -132.9600       4.7       106       214        96
WVCT   2025130    131400   -7.2900 -133.3900       6.3        57       220        83
WVCT   2025130    131400   -7.2700 -133.4200       7.3        54       221        74
WVCT   2025130    131400   -7.2100 -134.8400       4.6       159       262        98
WVCT   2025130    131400   -7.2800 -134.8900       5.6       156       262        99
WVCT   2025130    131400   -7.2300 -134.9600       5.5       159       264        99
WVCT   2025130    131400   -7.2100 -135.0500       6.6       167       251        81
WVCT   2025130    131400   -7.2100 -135.1500       7.4       172       239        78
WVCT   2025130    131400   -7.2100 -135.8200       5.7       143       242        96
WVCT   2025130    131400   -7.2300 -135.8400       5.6       135       241        99
WVCT   2025130    131400   -7.2600 -135.9700       4.6       118       242        98
WVCT   2025130    131400   -7.2400 -136.4000       5.5       117       233        87
WVCT   2025130    131400   -7.2400 -136.5000       4.5       108       222        96
WVCT   2025130    131400   -7.2400 -136.6000       5.1        82       219        73
WVCT   2025130    131400   -7.2400 -136.9100       4.0        80       191        80
WVCT   2025130    131400   -7.2600 -136.9500       5.7        74       191        88
WVCT   2025130    131400   -7.2600 -137.0400       9.0        61       186        93
WVCT   2025130    131400   -7.2200 -137.1900       6.9        51       182        77
WVCT   2025130    131400   -7.2200 -137.2100       6.4        51       182        73
WVCT   2025130    131400   -7.2400 -137.5900       4.0        48       195        93
WVCT   2025130    131400   -7.2400 -137.6600       4.0        35       198        93
WVCT   2025130    131400   -7.2200 -137.8200       4.6        35       196        98
WVCT   2025130    131400   -7.2400 -137.8400       4.5        22       196        87
WVCT   2025130    131400   -7.2800 -138.0100       4.9        29       182        90
WVCT   2025130    131400   -7.2000 -138.1000       6.5        20       180        87
WVCT   2025130    131400   -7.2400 -138.1500       5.7        25       190        95
WVCT   2025130    131400   -7.2600 -139.3700       5.8        87       210        99
WVCT   2025130    131400   -7.2400 -139.4800       6.6        94       214        95
WVCT   2025130    131400   -7.2000 -139.5700       4.1        88       213        84
WVCT   2025130    131400   -7.2000 -139.6400       4.8        67       215        97
WVCT   2025130    131400   -7.2200 -139.6800       5.2        64       216        94
WVCT   2025130    131400   -7.2600 -139.8000       4.2        34       234        78
WVCT   2025130    131400   -7.2700 -139.9100       4.4        16       240        72
WVCT   2025130    131400   -7.2000 -140.5800       6.7        44       200        64
WVCT   2025130    131400   -7.2000 -140.7500       6.2        43       226        80
WVCT   2025130    131400   -7.2000 -140.7800       5.1        41       228        71
WVCT   2025130    131400   -7.2000 -140.9100       4.4        62       233        60
WVCT   2025130    131400   -7.2000 -140.9800       7.6        66       233        68
WVCT   2025130    131400   -7.2600 -141.0700       9.7        42       230        72
WVCT   2025130    131400   -7.2400 -141.1300       9.5        28       209        63
WVCT   2025130    131400   -7.2400 -141.3800       6.6        12       218        68
WVCT   2025130    131400   -7.3100 -132.8000       4.2       104       199        84
WVCT   2025130    131400   -7.3100 -133.3700       5.7        58       217        92
WVCT   2025130    131400   -7.3800 -133.4600       5.4        48       218        65
WVCT   2025130    131400   -7.3600 -134.5600       5.1       138       247        83
WVCT   2025130    131400   -7.3600 -134.7600       4.7       152       236        98
WVCT   2025130    131400   -7.3400 -134.9100       6.1       156       241       100
WVCT   2025130    131400   -7.3400 -134.9300       5.9       163       242        94
WVCT   2025130    131400   -7.3600 -135.1100       9.2       189       231        61
WVCT   2025130    131400   -7.3300 -136.3700       5.0       142       244        91
WVCT   2025130    131400   -7.3500 -136.3900       4.7       153       244        94
WVCT   2025130    131400   -7.3100 -136.9700       5.4        74       190        83
WVCT   2025130    131400   -7.3700 -137.1000       5.9        70       184        90
WVCT   2025130    131400   -7.3700 -137.1100       5.9        67       184        86
WVCT   2025130    131400   -7.3000 -137.4100       4.2        49       188        66
WVCT   2025130    131400   -7.3700 -137.5300       4.0        45       191        92
WVCT   2025130    131400   -7.3300 -137.8800       4.4        12       195        84
WVCT   2025130    131400   -7.3700 -137.9900       5.2        34       186        99
WVCT   2025130    131400   -7.3300 -138.0200       4.7        35       181        90
WVCT   2025130    131400   -7.2900 -138.1900       4.2        28       198        81
WVCT   2025130    131400   -7.3500 -138.2000       4.8        23       197        87
WVCT   2025130    131400   -7.3700 -138.3000       4.7        26       198        79
WVCT   2025130    131400   -7.3700 -139.4200       5.4        80       239        96
WVCT   2025130    131400   -7.2900 -139.5100       6.8        82       243        87
WVCT   2025130    131400   -7.3700 -139.6000       5.2        78       242        66
WVCT   2025130    131400   -7.2900 -139.7800       4.1        35       238        84
WVCT   2025130    131400   -7.3100 -139.8700       4.2        13       244        65
WVCT   2025130    131400   -7.2900 -141.0700       8.8        36       234        71
WVCT   2025130    131400   -7.2900 -141.0900       8.7        33       233        71
WVCT   2025130    131400   -7.2900 -141.4300       7.0        11       206        72
WVCT   2025130    131400   -7.4700 -133.2200       4.0        96       225        97
WVCT   2025130    131400   -7.4700 -133.2400       4.1        98       227        95
WVCT   2025130    131400   -7.4700 -133.3300       4.5        89       226        88
WVCT   2025130    131400   -7.4300 -134.0600       4.2       146       229        96
WVCT   2025130    131400   -7.4700 -134.1900       5.0       119       239        69
WVCT   2025130    131400   -7.3900 -134.9200       6.4       172       236       100
WVCT   2025130    131400   -7.3900 -136.3800       4.2       165       247        93
WVCT   2025130    131400   -7.4300 -136.6900       4.4       130       223        87
WVCT   2025130    131400   -7.4300 -136.7100       4.0       156       223        60
WVCT   2025130    131400   -7.4400 -136.9100       5.3        92       197        71
WVCT   2025130    131400   -7.4200 -136.9900       5.3        85       189        88
WVCT   2025130    131400   -7.3900 -137.1100       5.6        71       184        86
WVCT   2025130    131400   -7.4200 -137.2400       7.4        62       185        90
WVCT   2025130    131400   -7.3900 -137.3000       5.5        66       188        60
WVCT   2025130    131400   -7.4200 -137.4400       4.1        34       187        91
WVCT   2025130    131400   -7.4000 -137.9700       4.9        37       192        98
WVCT   2025130    131400   -7.3900 -138.0200       4.7        35       182        99
WVCT   2025130    131400   -7.4000 -138.3100       5.0        23       197        81
WVCT   2025130    131400   -7.4000 -138.3900       4.6        30       170        88
WVCT   2025130    131400   -7.3800 -139.4200       5.1        81       240        97
WVCT   2025130    131400   -7.3800 -139.4400       5.5        78       243        99
WVCT   2025130    131400   -7.4600 -139.5800       4.6       101       244        96
WVCT   2025130    131400   -7.4000 -139.6200       5.2        90       243        66
WVCT   2025130    131400   -7.3800 -139.9700       4.6        68       244        79
WVCT   2025130    131400   -7.4600 -140.5100       4.3        17       229        64
WVCT   2025130    131400   -7.4400 -140.5600       4.3       355       233        65
WVCT   2025130    131400   -7.4400 -140.6400       4.5       330       251        89
WVCT   2025130    131400   -7.4600 -141.1400       5.7       114       174        93
WVCT   2025130    131400   -7.4400 -141.3300       6.3       119       177        80
WVCT   2025130    131400   -7.5600 -133.1800       4.0       100       228        92
WVCT   2025130    131400   -7.5300 -133.3100       4.4        99       227        92
WVCT   2025130    131400   -7.5400 -133.3300       4.4        99       225        83
WVCT   2025130    131400   -7.5600 -134.2300       5.0       128       242        90
WVCT   2025130    131400   -7.5600 -134.2400       5.0       131       243        83
WVCT   2025130    131400   -7.5400 -134.3400       4.9       162       253        66
WVCT   2025130    131400   -7.5400 -136.2200       6.9       171       255        76
WVCT   2025130    131400   -7.4800 -136.3500       5.4       175       250        60
WVCT   2025130    131400   -7.5500 -136.4400       4.7       210       244        88
WVCT   2025130    131400   -7.4800 -136.9300       6.5        88       197        75
WVCT   2025130    131400   -7.4800 -136.9700       6.1        81       190        86
WVCT   2025130    131400   -7.5200 -137.0400       4.9        72       189        88
WVCT   2025130    131400   -7.5000 -137.1700       4.6        62       187        88
WVCT   2025130    131400   -7.5200 -137.2400       6.4        51       190        90
WVCT   2025130    131400   -7.5000 -137.3900       6.2        47       189        82
WVCT   2025130    131400   -7.5500 -137.4600       6.1        58       188        90
WVCT   2025130    131400   -7.5300 -137.4900       6.2        59       188        93
WVCT   2025130    131400   -7.5200 -137.5900       6.1        54       192        99
WVCT   2025130    131400   -7.5300 -138.0000       4.0        35       190        99
WVCT   2025130    131400   -7.5500 -138.3800       4.0        19       170        95
WVCT   2025130    131400   -7.5500 -138.4000       4.0        15       170        93
WVCT   2025130    131400   -7.4800 -139.4400       4.5        91       247       100
WVCT   2025130    131400   -7.5100 -139.5700       4.3       107       244        98
WVCT   2025130    131400   -7.5100 -139.5800       4.4       107       244       100
WVCT   2025130    131400   -7.5100 -139.6700       5.6       107       244        81
WVCT   2025130    131400   -7.5500 -139.8400       4.3        55       248        60
WVCT   2025130    131400   -7.5500 -139.8700       8.4        47       245        83
WVCT   2025130    131400   -7.4900 -139.9600       7.4        65       241        73
WVCT   2025130    131400   -7.5500 -140.4700       5.7        15       229        74
WVCT   2025130    131400   -7.5500 -140.5600       7.0         5       233       100
WVCT   2025130    131400   -7.5500 -140.5800       7.2         3       233       100
WVCT   2025130    131400   -7.5300 -140.6700       6.4       345       254        65
WVCT   2025130    131400   -7.5500 -141.3600       5.5        93       187        83
WVCT   2025130    131400   -7.6600 -132.8600       6.2        88       213        98
WVCT   2025130    131400   -7.5800 -133.2300       4.0       105       225        88
WVCT   2025130    131400   -7.6500 -134.0600       5.4       123       231        99
WVCT   2025130    131400   -7.5800 -134.2300       5.4       124       242        98
WVCT   2025130    131400   -7.6000 -134.2600       5.2       130       248        92
WVCT   2025130    131400   -7.5800 -134.3400       4.7       160       255        66
WVCT   2025130    131400   -7.5900 -135.8000       4.8       164       265       100
WVCT   2025130    131400   -7.6500 -135.9600       4.6       164       261        87
WVCT   2025130    131400   -7.6300 -136.1100       5.8       114       262        61
WVCT   2025130    131400   -7.5700 -136.1800       6.0       163       258        78
WVCT   2025130    131400   -7.6300 -136.2500      18.7       210       249        63
WVCT   2025130    131400   -7.5700 -136.4200       5.9       222       244        88
WVCT   2025130    131400   -7.6100 -136.4900       7.4       205       239        80
WVCT   2025130    131400   -7.5700 -136.5500       4.5       177       228        63
WVCT   2025130    131400   -7.6100 -136.8900      14.0        95       216        62
WVCT   2025130    131400   -7.5700 -136.9700       9.3        82       213        74
WVCT   2025130    131400   -7.5700 -137.0900       5.9        66       190        96
WVCT   2025130    131400   -7.5900 -137.1100       6.0        65       194        98
WVCT   2025130    131400   -7.5700 -137.3700       4.7        46       198        85
WVCT   2025130    131400   -7.5900 -137.4200       6.2        60       193        90
WVCT   2025130    131400   -7.5700 -137.4800       6.5        62       191        94
WVCT   2025130    131400   -7.6400 -137.6400       6.3        70       203        90
WVCT   2025130    131400   -7.5700 -137.6800       4.6        54       202        97
WVCT   2025130    131400   -7.6000 -139.4400       4.4       105       225        88
WVCT   2025130    131400   -7.6200 -139.4700       4.7       107       221        94
WVCT   2025130    131400   -7.5900 -139.6200       5.9       101       243        99
WVCT   2025130    131400   -7.5900 -139.6700       6.0        92       244        87
WVCT   2025130    131400   -7.6400 -139.7800       6.3        51       244        70
WVCT   2025130    131400   -7.5700 -139.8700       9.0        45       243        85
WVCT   2025130    131400   -7.5900 -139.9500       9.9        51       235        80
WVCT   2025130    131400   -7.5900 -140.4900       6.7        22       230        82
WVCT   2025130    131400   -7.5700 -140.5600       7.1         7       232       100
WVCT   2025130    131400   -7.6000 -141.2900       8.5        81       197        76
WVCT   2025130    131400   -7.6400 -141.3600       9.7        75       193        92
WVCT   2025130    131400   -7.6700 -132.8100       6.8        91       220        97
WVCT   2025130    131400   -7.7100 -132.9000       5.2        92       218        99
WVCT   2025130    131400   -7.7300 -133.8200       5.7        96       221        72
WVCT   2025130    131400   -7.7100 -133.8700       7.7        90       222        76
WVCT   2025130    131400   -7.6700 -134.0400       5.3       128       231       100
WVCT   2025130    131400   -7.7100 -134.0600       6.5       119       233        94
WVCT   2025130    131400   -7.6900 -134.1500       7.8       110       239        87
WVCT   2025130    131400   -7.6700 -134.2400       6.2       119       245        94
WVCT   2025130    131400   -7.6700 -134.3700       6.3       191       271        87
WVCT   2025130    131400   -7.6700 -135.9800       5.1       155       261        99
WVCT   2025130    131400   -7.6600 -136.0700       5.3       114       263       100
WVCT   2025130    131400   -7.7400 -136.1400       8.2       118       257        98
WVCT   2025130    131400   -7.6800 -136.4500       9.8       224       235        91
WVCT   2025130    131400   -7.7400 -136.5300      10.0       218       233        89
WVCT   2025130    131400   -7.7000 -136.6400       7.6       217       231        99
WVCT   2025130    131400   -7.7000 -136.6500       7.3       218       230        92
WVCT   2025130    131400   -7.6600 -137.0400       7.9        75       205        79
WVCT   2025130    131400   -7.6600 -137.1300       5.8        59       202        88
WVCT   2025130    131400   -7.6600 -137.1500       5.2        52       204        84
WVCT   2025130    131400   -7.7000 -137.3100       5.0        35       208        75
WVCT   2025130    131400   -7.7400 -137.4000       7.0        56       200        83
WVCT   2025130    131400   -7.6600 -137.4200       7.5        59       195        90
WVCT   2025130    131400   -7.7200 -137.5700       7.0        78       200        79
WVCT   2025130    131400   -7.6600 -137.6200       6.8        73       202        82
WVCT   2025130    131400   -7.7400 -137.7700       7.4       108       195        97
WVCT   2025130    131400   -7.7400 -137.7800       6.9       112       202        96
WVCT   2025130    131400   -7.7300 -138.7100       5.4        93       178        72
WVCT   2025130    131400   -7.7000 -139.4000       4.5       107       187        87
WVCT   2025130    131400   -7.6800 -139.4200       4.3       104       196        85
WVCT   2025130    131400   -7.7100 -139.5600       4.9       112       206        86
WVCT   2025130    131400   -7.6800 -139.6400       6.0        98       236        77
WVCT   2025130    131400   -7.6600 -139.7100       5.1        71       243        89
WVCT   2025130    131400   -7.7100 -139.8000       6.2        50       236        91
WVCT   2025130    131400   -7.7300 -139.8900       9.6        54       224        98
WVCT   2025130    131400   -7.7300 -139.9800       9.3        59       217        94
WVCT   2025130    131400   -7.6600 -140.1300       4.0        80       213        75
WVCT   2025130    131400   -7.7000 -140.4400       8.3        65       197        62
WVCT   2025130    131400   -7.6600 -140.5100      10.9        34       226        71
WVCT   2025130    131400   -7.7000 -140.6200      17.6        38       213        89
WVCT   2025130    131400   -7.6600 -141.3300      10.2        74       197        89
WVCT   2025130    131400   -7.7100 -141.4200      10.1        83       190        74
WVCT   2025130    131400   -7.8200 -132.8000       5.4        93       225        97
WVCT   2025130    131400   -7.8000 -132.8800       4.8        98       223        99
WVCT   2025130    131400   -7.8000 -132.9500       4.1       101       222        99
WVCT   2025130    131400   -7.8400 -133.1000       4.0       113       226        93
WVCT   2025130    131400   -7.8000 -133.1900       4.3       108       222        98
WVCT   2025130    131400   -7.8400 -133.2300       4.7       113       204        99
WVCT   2025130    131400   -7.8200 -133.5800       4.0       133       216        82
WVCT   2025130    131400   -7.8200 -133.6000       4.2       137       216        86
WVCT   2025130    131400   -7.8200 -133.6900       5.0       146       219        96
WVCT   2025130    131400   -7.8000 -133.8500       5.8       126       222        91
WVCT   2025130    131400   -7.8400 -133.8700       5.6       137       222        92
WVCT   2025130    131400   -7.7800 -134.0400       6.1       122       231        97
WVCT   2025130    131400   -7.7800 -134.0900       7.8       110       234        89
WVCT   2025130    131400   -7.7600 -135.8700      11.7       164       254        94
WVCT   2025130    131400   -7.7600 -135.9800       8.3       156       258        93
WVCT   2025130    131400   -7.7600 -136.0000       7.9       154       258        85
WVCT   2025130    131400   -7.7500 -137.0200       7.6        87       208        99
WVCT   2025130    131400   -7.7500 -137.1600       4.5        46       215        65
WVCT   2025130    131400   -7.7500 -137.3100       5.4        43       208        82
WVCT   2025130    131400   -7.8300 -137.3600       5.9        61       206        83
WVCT   2025130    131400   -7.7900 -137.4700       7.3        73       190        74
WVCT   2025130    131400   -7.8300 -137.5600       8.3        83       188        89
WVCT   2025130    131400   -7.7700 -137.6400       8.5        90       189        94
WVCT   2025130    131400   -7.7500 -137.7700       8.0       110       179        96
WVCT   2025130    131400   -7.7700 -137.8200       5.9       130       203        79
WVCT   2025130    131400   -7.8300 -137.8700       6.1       144       195        63
WVCT   2025130    131400   -7.7700 -138.1700       4.4        16       214       100
WVCT   2025130    131400   -7.7500 -138.6900       5.3        86       179        77
WVCT   2025130    131400   -7.7700 -139.4000       5.9       120       169        95
WVCT   2025130    131400   -7.8300 -139.5300       4.8       120       180        98
WVCT   2025130    131400   -7.7500 -139.6200       5.2       106       207        80
WVCT   2025130    131400   -7.7500 -139.8900       9.2        58       224        98
WVCT   2025130    131400   -7.7700 -139.9800       8.5        65       216        72
WVCT   2025130    131400   -7.8200 -140.0700       8.0        60       208        72
WVCT   2025130    131400   -7.8100 -140.1300       7.5        53       206        83
WVCT   2025130    131400   -7.8200 -140.9800       4.5        57       208        85
WVCT   2025130    131400   -7.7700 -141.0000       4.4        62       205        70
WVCT   2025130    131400   -7.7900 -141.1100       4.7        66       208        68
WVCT   2025130    131400   -7.7500 -141.2500       9.5        73       199        79
WVCT   2025130    131400   -7.8100 -141.3300       9.9        77       192        91
WVCT   2025130    131400   -7.7500 -141.4400      10.3        90       190        89
WVCT   2025130    131400   -7.8800 -132.7800       5.3        86       222        96
WVCT   2025130    131400   -7.9300 -132.8800       5.0        80       219        98
WVCT   2025130    131400   -7.8600 -133.0100       4.1       102       223        91
WVCT   2025130    131400   -7.8900 -133.1200       4.6       118       222        96
WVCT   2025130    131400   -7.8900 -133.1300       4.6       119       221        98
WVCT   2025130    131400   -7.9300 -133.2600       4.8       116       209        95
WVCT   2025130    131400   -7.9300 -133.3500       4.3       114       218        91
WVCT   2025130    131400   -7.8600 -133.5800       4.3       131       216        86
WVCT   2025130    131400   -7.8600 -133.6000       4.6       135       217        92
WVCT   2025130    131400   -7.8900 -133.6900       6.2       129       220        94
WVCT   2025130    131400   -7.8500 -133.8500       5.6       144       221        91
WVCT   2025130    131400   -7.8500 -133.8700       5.7       143       222        92
WVCT   2025130    131400   -7.9100 -133.9600      10.3        93       223        85
WVCT   2025130    131400   -7.9200 -137.0900      13.7       124       218        90
WVCT   2025130    131400   -7.9200 -137.1800      11.5       128       218        67
WVCT   2025130    131400   -7.8500 -137.2700       4.9        67       216        63
WVCT   2025130    131400   -7.8500 -137.3600       5.5        66       207        80
WVCT   2025130    131400   -7.9200 -137.4400       7.2        81       202        83
WVCT   2025130    131400   -7.9200 -137.5300       9.2        80       167        89
WVCT   2025130    131400   -7.9000 -137.5600       9.7        84       165        87
WVCT   2025130    131400   -7.8500 -137.6600      10.2        89       143        78
WVCT   2025130    131400   -7.8500 -137.8900       5.5       153       190        64
WVCT   2025130    131400   -7.8800 -137.9500       4.6       189       197        79
WVCT   2025130    131400   -7.8800 -138.2400       4.2       359       221        96
WVCT   2025130    131400   -7.9000 -138.2900       4.2       348       220        85
WVCT   2025130    131400   -7.9000 -138.5300       6.0        98       167        79
WVCT   2025130    131400   -7.8400 -139.5300       4.4       123       178        93
WVCT   2025130    131400   -7.9200 -139.8000       5.3        68       219        92
WVCT   2025130    131400   -7.9200 -139.9300       8.8        71       210        99
WVCT   2025130    131400   -7.9200 -140.0400       8.7        72       206        97
WVCT   2025130    131400   -7.9200 -140.0700       7.9        73       205        97
WVCT   2025130    131400   -7.8800 -140.1600       7.1        56       205        95
WVCT   2025130    131400   -7.8400 -140.9300       4.4        62       205        94
WVCT   2025130    131400   -7.8400 -141.0400       4.7        66       197        84
WVCT   2025130    131400   -7.8800 -141.1800       5.4        54       190        63
WVCT   2025130    131400   -7.8600 -141.2700       9.1        62       184        79
WVCT   2025130    131400   -7.8400 -141.3100       9.8        68       187        85
WVCT   2025130    131400   -7.9900 -132.7600       5.4        77       220        95
WVCT   2025130    131400   -7.9500 -132.8900       5.0        79       219        97
WVCT   2025130    131400   -7.9500 -132.9500       4.5        83       218        95
WVCT   2025130    131400   -7.9500 -133.0600       4.2       109       214        97
WVCT   2025130    131400   -7.9900 -133.1300       4.1       115       192        98
WVCT   2025130    131400   -7.9700 -133.2600       4.6       116       214        90
WVCT   2025130    131400   -7.9700 -133.3500       4.5       117       218        97
WVCT   2025130    131400   -7.9500 -133.4800       4.0       124       214        99
WVCT   2025130    131400   -7.9500 -133.5000       4.2       121       214       100
WVCT   2025130    131400   -7.9700 -133.5900       5.2       115       218       100
WVCT   2025130    131400   -7.9500 -133.7200       5.5       144       220        93
WVCT   2025130    131400   -8.0000 -133.7900       6.3        80       220        60
WVCT   2025130    131400   -7.9600 -136.5800       7.2       157       227        93
WVCT   2025130    131400   -7.9900 -136.9200       6.0       109       236        78
WVCT   2025130    131400   -8.0100 -137.0900      13.3       122       217        93
WVCT   2025130    131400   -7.9900 -137.1800      12.5       132       219        75
WVCT   2025130    131400   -7.9400 -137.2000      11.2       131       219        64
WVCT   2025130    131400   -7.9600 -137.3600       5.1        95       214        76
WVCT   2025130    131400   -7.9600 -137.4400       7.1        80       189        94
WVCT   2025130    131400   -7.9400 -137.5300       9.3        79       165        87
WVCT   2025130    131400   -7.9400 -137.5600      10.3        80       154        79
WVCT   2025130    131400   -8.0100 -137.7800      14.0       350       109        92
WVCT   2025130    131400   -7.9700 -138.0200       4.5       238       200        95
WVCT   2025130    131400   -7.9700 -138.1500       4.1       316       208        99
WVCT   2025130    131400   -7.9700 -138.2400       4.9       344       215        99
WVCT   2025130    131400   -7.9900 -138.2900       5.6       346       224        97
WVCT   2025130    131400   -7.9900 -138.3800       4.7        14       219        93
WVCT   2025130    131400   -8.0100 -138.5300       4.5        47       207        97
WVCT   2025130    131400   -7.9900 -138.6400       4.3        56       166       100
WVCT   2025130    131400   -7.9900 -138.6500       4.3        58       166        98
WVCT   2025130    131400   -7.9900 -138.7800       6.2        49       165        87
WVCT   2025130    131400   -8.0100 -139.8200       5.1        72       210        76
WVCT   2025130    131400   -8.0100 -139.9500       7.9        77       208        95
WVCT   2025130    131400   -8.0100 -139.9600       8.4        76       208        97
WVCT   2025130    131400   -7.9400 -140.0500       8.2        76       206        94
WVCT   2025130    131400   -7.9300 -140.2000       4.6        86       205        84
WVCT   2025130    131400   -8.0100 -140.9300      12.2        48       194        70
WVCT   2025130    131400   -8.0100 -141.3100       7.7        46       195        82
WVCT   2025130    131400   -8.0100 -141.4200       9.3        52       206        87
WVCT   2025130    131400   -8.1200 -133.1100       4.5       108       209        99
WVCT   2025130    131400   -8.1100 -133.1700       4.8       107       219        95
WVCT   2025130    131400   -8.0600 -133.2600       5.2       108       222        96
WVCT   2025130    131400   -8.0800 -133.3100       5.5       110       219        99
WVCT   2025130    131400   -8.0400 -133.4100       5.7       118       214       100
WVCT   2025130    131400   -8.0400 -133.5200       6.2       113       216        97
WVCT   2025130    131400   -8.0900 -133.6800       4.5        90       218        90
WVCT   2025130    131400   -8.0700 -136.8100       4.5       137       236        98
WVCT   2025130    131400   -8.0300 -136.8700       5.3       112       238        83
WVCT   2025130    131400   -8.0900 -137.0200       9.7       118       217        84
WVCT   2025130    131400   -8.0700 -137.0500      11.4       115       217        88
WVCT   2025130    131400   -8.0700 -137.1600      12.6       123       215        75
WVCT   2025130    131400   -8.1000 -137.3800       6.4        76       191        94
WVCT   2025130    131400   -8.0700 -137.4200       7.4        69       165        94
WVCT   2025130    131400   -8.0700 -137.5400       9.6        68       143        66
WVCT   2025130    131400   -8.0700 -137.6000      10.9        71       127        60
WVCT   2025130    131400   -8.1000 -137.7400      12.1       350       107        87
WVCT   2025130    131400   -8.0800 -137.8200      12.6       342       103        76
WVCT   2025130    131400   -8.0500 -137.8700      11.4       338       103        72
WVCT   2025130    131400   -8.0500 -138.0400       8.1       290       182        83
WVCT   2025130    131400   -8.0700 -138.0500      11.5       302       190        69
WVCT   2025130    131400   -8.0800 -138.1400       8.3       305       210        85
WVCT   2025130    131400   -8.0300 -138.2700       6.0       346       216        97
WVCT   2025130    131400   -8.0500 -138.3300       6.2       354       223        95
WVCT   2025130    131400   -8.1000 -138.4500       4.3        12       223       100
WVCT   2025130    131400   -8.0500 -138.5100       4.8        30       213        98
WVCT   2025130    131400   -8.0600 -138.6700       5.5        51       202       100
WVCT   2025130    131400   -8.0600 -138.6900       5.5        52       202        98
WVCT   2025130    131400   -8.1000 -138.7800       6.3        49       164        99
WVCT   2025130    131400   -8.0500 -139.5100       4.8        57       157        98
WVCT   2025130    131400   -8.0600 -139.7600       5.6        65       204        84
WVCT   2025130    131400   -8.0300 -139.8400       4.3        85       209        73
WVCT   2025130    131400   -8.0300 -139.9500       7.8        78       208        90
WVCT   2025130    131400   -8.0300 -139.9600       8.4        76       208        90
WVCT   2025130    131400   -8.1000 -140.0900       8.0        70       221        76
WVCT   2025130    131400   -8.1000 -140.8000      12.9        48       208        84
WVCT   2025130    131400   -8.1000 -141.0200       8.2        42       208        81
WVCT   2025130    131400   -8.1000 -141.2900       7.4        45       184        82
WVCT   2025130    131400   -8.0800 -141.3100       8.4        49       186        84
WVCT   2025130    131400   -8.1700 -133.0200       4.2       117       196        84
WVCT   2025130    131400   -8.1500 -133.0900       4.2       114       208        92
WVCT   2025130    131400   -8.1300 -133.1300       4.6       110       215        97
WVCT   2025130    131400   -8.1900 -133.2900       5.5       111       216        96
WVCT   2025130    131400   -8.1900 -133.3100       5.8       110       216        97
WVCT   2025130    131400   -8.1300 -133.4400       7.2       108       214        91
WVCT   2025130    131400   -8.2100 -133.5700       7.2        86       216       100
WVCT   2025130    131400   -8.1700 -133.6800       4.3        92       218        97
WVCT   2025130    131400   -8.1800 -136.6700       8.4       131       216        84
WVCT   2025130    131400   -8.2000 -136.7000       9.2       124       215        87
WVCT   2025130    131400   -8.2000 -136.8300      10.5       124       177        80
WVCT   2025130    131400   -8.2000 -136.9400      12.7       126       208        89
WVCT   2025130    131400   -8.1600 -137.0000      12.2       125       217        81
WVCT   2025130    131400   -8.2000 -137.1200      10.6       119       211        93
WVCT   2025130    131400   -8.2000 -137.1400       9.9       117       211        88
WVCT   2025130    131400   -8.1800 -137.2900       6.7       105       217        69
WVCT   2025130    131400   -8.1800 -137.3800       6.4        64       170        86
WVCT   2025130    131400   -8.1600 -137.4200       6.5        61       154        96
WVCT   2025130    131400   -8.1600 -137.5100       7.8        54       139        73
WVCT   2025130    131400   -8.1200 -137.6000       9.9        65       127        64
WVCT   2025130    131400   -8.1900 -137.9400      10.6       328       112        67
WVCT   2025130    131400   -8.1200 -138.0200      13.4       310       155        83
WVCT   2025130    131400   -8.1900 -138.0500      11.2       303       185        91
WVCT   2025130    131400   -8.1200 -138.1400       9.2       304       214        94
WVCT   2025130    131400   -8.1800 -138.3100       5.4       357       221        81
WVCT   2025130    131400   -8.1800 -138.3400       5.3         4       223        91
WVCT   2025130    131400   -8.1900 -138.6000       4.6        30       162        95
WVCT   2025130    131400   -8.1900 -138.7300       6.4        32       163        99
WVCT   2025130    131400   -8.1900 -138.7800       5.6        40       163       100
WVCT   2025130    131400   -8.1200 -139.4500       6.3        53       154        95
WVCT   2025130    131400   -8.1900 -139.5800       5.7        45       164        98
WVCT   2025130    131400   -8.1600 -139.6000       5.7        42       172        99
WVCT   2025130    131400   -8.1900 -139.7100       7.8        63       185        89
WVCT   2025130    131400   -8.1900 -139.7800       7.9        64       203        95
WVCT   2025130    131400   -8.1200 -139.9300       7.0        69       208        97
WVCT   2025130    131400   -8.1900 -139.9800       9.2        56       208        86
WVCT   2025130    131400   -8.1600 -140.1100       7.1        59       222        93
WVCT   2025130    131400   -8.1900 -140.1500       6.6        43       221        85
WVCT   2025130    131400   -8.1700 -140.2700       7.9        25       217        82
WVCT   2025130    131400   -8.1600 -140.3300       7.6        17       220        86
WVCT   2025130    131400   -8.1900 -140.6700      15.0        54       216       100
WVCT   2025130    131400   -8.1600 -140.7100      14.5        55       208        98
WVCT   2025130    131400   -8.1900 -140.8500      12.1        37       215        93
WVCT   2025130    131400   -8.1900 -140.9500      12.4        33       214        98
WVCT   2025130    131400   -8.1900 -141.2000       9.5        43       183        84
WVCT   2025130    131400   -8.1200 -141.2900       7.5        48       183        84
WVCT   2025130    131400   -8.1200 -141.4000      10.6        66       182        81
WVCT   2025130    131400   -8.3000 -133.0200       4.5       100       188        84
WVCT   2025130    131400   -8.2200 -133.2900       5.2       115       214        98
WVCT   2025130    131400   -8.2200 -133.3100       5.5       114       214        98
WVCT   2025130    131400   -8.3000 -133.4600       6.8        97       216        99
WVCT   2025130    131400   -8.2800 -133.4900       8.1        90       216        98
WVCT   2025130    131400   -8.2200 -133.5900       7.3        86       217        98
WVCT   2025130    131400   -8.2500 -136.0800      11.1        93       221        61
WVCT   2025130    131400   -8.2900 -136.2500      12.0        94       218        91
WVCT   2025130    131400   -8.2900 -136.3000      11.4        99       219        80
WVCT   2025130    131400   -8.2900 -136.4300      11.5       103       218        74
WVCT   2025130    131400   -8.2900 -136.5200      10.0       103       214        77
WVCT   2025130    131400   -8.2900 -136.5400       9.9       105       214        77
WVCT   2025130    131400   -8.2100 -136.6500       9.4       119       215        89
WVCT   2025130    131400   -8.2900 -136.7800       8.3       116       176       100
WVCT   2025130    131400   -8.2500 -136.8900      10.9       130       178        90
WVCT   2025130    131400   -8.2700 -136.9800      14.8       131       185        84
WVCT   2025130    131400   -8.2700 -137.0700      13.3       131       207        99
WVCT   2025130    131400   -8.2700 -137.0900      12.9       131       207        98
WVCT   2025130    131400   -8.2300 -137.2300       7.0       101       214        86
WVCT   2025130    131400   -8.2100 -137.3100       6.0        64       210        62
WVCT   2025130    131400   -8.2900 -137.3600       6.6        41       173        98
WVCT   2025130    131400   -8.2300 -137.5100       6.0        39       136        64
WVCT   2025130    131400   -8.2100 -137.5400       6.4        55       132        65
WVCT   2025130    131400   -8.2500 -137.8900      10.0       351       113        99
WVCT   2025130    131400   -8.2900 -137.9800      11.3       345       178        89
WVCT   2025130    131400   -8.2900 -138.0000      11.4       341       205        90
WVCT   2025130    131400   -8.2300 -138.1600       9.7       307       229        87
WVCT   2025130    131400   -8.2500 -138.2000       8.8       309       228        98
WVCT   2025130    131400   -8.2300 -138.2700       6.4       330       227        94
WVCT   2025130    131400   -8.2900 -138.3800       8.2       342       224        98
WVCT   2025130    131400   -8.2500 -138.6500       5.8        27       161        99
WVCT   2025130    131400   -8.2900 -138.7300       6.3        20       163        99
WVCT   2025130    131400   -8.2300 -139.0700       6.2        19       156        92
WVCT   2025130    131400   -8.2300 -139.1100       5.4        22       192        91
WVCT   2025130    131400   -8.2700 -139.5600       5.1        35       167        91
WVCT   2025130    131400   -8.2100 -139.7100       7.6        60       185        89
WVCT   2025130    131400   -8.2100 -139.7300       7.9        63       188        90
WVCT   2025130    131400   -8.2500 -139.8400       8.4        58       206        81
WVCT   2025130    131400   -8.2100 -140.0500       7.4        62       210        98
WVCT   2025130    131400   -8.2300 -140.1600       6.1        54       206        72
WVCT   2025130    131400   -8.2500 -140.1800       6.0        55       203        74
WVCT   2025130    131400   -8.2700 -140.3100       6.3        29       204        91
WVCT   2025130    131400   -8.2700 -140.6200      14.3        50       225        97
WVCT   2025130    131400   -8.2800 -140.6400      14.6        50       223       100
WVCT   2025130    131400   -8.2700 -140.8000      13.3        41       220       100
WVCT   2025130    131400   -8.2800 -140.8900      11.7        24       223        93
WVCT   2025130    131400   -8.2800 -140.9100      11.9        23       223        95
WVCT   2025130    131400   -8.2100 -141.2200       9.1        42       182        84
WVCT   2025130    131400   -8.2800 -141.2900       7.8        64       182        96
WVCT   2025130    131400   -8.2800 -141.4200       9.1        73       177        60
WVCT   2025130    131400   -8.3900 -132.8100       4.3        77       194        96
WVCT   2025130    131400   -8.3900 -132.8800       5.1        79       192        88
WVCT   2025130    131400   -8.3700 -132.9800       5.3        81       191        82
WVCT   2025130    131400   -8.3900 -133.2000       4.1        97       210        96
WVCT   2025130    131400   -8.3900 -133.2700       5.7       107       215       100
WVCT   2025130    131400   -8.3700 -133.3100       6.0       110       211        99
WVCT   2025130    131400   -8.3300 -133.4800       6.4       104       217       100
WVCT   2025130    131400   -8.3200 -133.4900       7.1        97       218        99
WVCT   2025130    131400   -8.3800 -135.4900      11.2        83       232       100
WVCT   2025130    131400   -8.3600 -135.6200      13.0        81       224       100
WVCT   2025130    131400   -8.3800 -135.7300      12.4        89       214       100
WVCT   2025130    131400   -8.3600 -135.7700      12.5        91       208       100
WVCT   2025130    131400   -8.3500 -135.8600      12.8        89       217        99
WVCT   2025130    131400   -8.3500 -135.9700      11.7        87       223        91
WVCT   2025130    131400   -8.3600 -136.0400      11.3        86       223        71
WVCT   2025130    131400   -8.3800 -136.1200      10.8        86       221        60
WVCT   2025130    131400   -8.3800 -136.2600      11.0        90       217        88
WVCT   2025130    131400   -8.3400 -136.3400      12.3        96       216        82
WVCT   2025130    131400   -8.3800 -136.4600      12.2       101       206        95
WVCT   2025130    131400   -8.3100 -136.5600       9.9       102       214        77
WVCT   2025130    131400   -8.3400 -136.6500       9.4       100       201        84
WVCT   2025130    131400   -8.3400 -136.7000      10.3       102       180        75
WVCT   2025130    131400   -8.3400 -136.8300       7.5       128       174        86
WVCT   2025130    131400   -8.3200 -136.9200      10.6       136       176        93
WVCT   2025130    131400   -8.3400 -136.9400      11.2       136       177        91
WVCT   2025130    131400   -8.3800 -137.1000      13.9       135       194        94
WVCT   2025130    131400   -8.3800 -137.1200      13.6       134       196        93
WVCT   2025130    131400   -8.3800 -137.2500       8.1       116       210        62
WVCT   2025130    131400   -8.3100 -137.3600       6.7        41       178        96
WVCT   2025130    131400   -8.3800 -137.4000       6.7        41       175        74
WVCT   2025130    131400   -8.3800 -137.4900       6.4        57       150        61
WVCT   2025130    131400   -8.3600 -137.9200      10.2         9       177        75
WVCT   2025130    131400   -8.3000 -137.9800      11.1       349       181        86
WVCT   2025130    131400   -8.3200 -138.0300      11.5       342       230        80
WVCT   2025130    131400   -8.3600 -138.1400      11.3       324       229        78
WVCT   2025130    131400   -8.3800 -138.2900       8.9       321       228        87
WVCT   2025130    131400   -8.3800 -138.3800      10.3       338       227        96
WVCT   2025130    131400   -8.3200 -138.4000       9.9       342       223        99
WVCT   2025130    131400   -8.3600 -138.7400       5.1        22       207        98
WVCT   2025130    131400   -8.3800 -138.7600       5.0        31       203        99
WVCT   2025130    131400   -8.3000 -139.0900       7.0        14       153        89
WVCT   2025130    131400   -8.3000 -139.1300       5.9        16       198        88
WVCT   2025130    131400   -8.3400 -139.7100       4.0        62       185        84
WVCT   2025130    131400   -8.3600 -139.7600       4.0        74       192        92
WVCT   2025130    131400   -8.3600 -140.0700       6.1        41       199        87
WVCT   2025130    131400   -8.3000 -140.1300       5.4        57       200        77
WVCT   2025130    131400   -8.3800 -140.2900       5.0        41       218        97
WVCT   2025130    131400   -8.3800 -140.3100       5.0        37       220       100
WVCT   2025130    131400   -8.3800 -140.4000       8.2        50       223        76
WVCT   2025130    131400   -8.3400 -140.5600      11.8        55       229        90
WVCT   2025130    131400   -8.3000 -140.6400      14.2        50       223        99
WVCT   2025130    131400   -8.3600 -140.7300      10.9        44       223       100
WVCT   2025130    131400   -8.3200 -140.7600      12.0        43       220        99
WVCT   2025130    131400   -8.3200 -140.8500      10.9        26       223        97
WVCT   2025130    131400   -8.3600 -141.0200       9.2        30       191        98
WVCT   2025130    131400   -8.3600 -141.1300       9.2        52       189        96
WVCT   2025130    131400   -8.3800 -141.2900       8.1        67       187        92
WVCT   2025130    131400   -8.3800 -141.3100       7.8        68       186        89
WVCT   2025130    131400   -8.4500 -132.9200       4.9        81       199        88
WVCT   2025130    131400   -8.4500 -132.9400       4.8        79       200        87
WVCT   2025130    131400   -8.4800 -133.1800       5.6        90       223       100
WVCT   2025130    131400   -8.4100 -133.2500       5.6       102       216       100
WVCT   2025130    131400   -8.4600 -133.3600       6.2       112       216        99
WVCT   2025130    131400   -8.4300 -133.4000       5.1       128       217        96
WVCT   2025130    131400   -8.4200 -135.4600       9.7        92       232        98
WVCT   2025130    131400   -8.4800 -135.5300      11.8        99       232        99
WVCT   2025130    131400   -8.4600 -135.5700      11.7        94       230        98
WVCT   2025130    131400   -8.4700 -135.6900      12.4       100       222       100
WVCT   2025130    131400   -8.4000 -135.7500      12.4        91       217       100
WVCT   2025130    131400   -8.4400 -135.8400      11.7        90       222       100
WVCT   2025130    131400   -8.4700 -135.9300      11.9        88       225        99
WVCT   2025130    131400   -8.4700 -136.0400      12.0        81       225        99
WVCT   2025130    131400   -8.4000 -136.2800      10.5        88       217        92
WVCT   2025130    131400   -8.4200 -136.3700      11.9        92       210        99
WVCT   2025130    131400   -8.4200 -136.4500      12.2       100       206        99
WVCT   2025130    131400   -8.4200 -136.5400      11.4        97       198        95
WVCT   2025130    131400   -8.4500 -136.6100      11.5        88       182        97
WVCT   2025130    131400   -8.4700 -136.6800       9.4        99       180        75
WVCT   2025130    131400   -8.4700 -136.8300       7.4       120       175        60
WVCT   2025130    131400   -8.4500 -136.9000       8.4       131       177        91
WVCT   2025130    131400   -8.4500 -136.9400       9.9       133       177        95
WVCT   2025130    131400   -8.4000 -137.0700      14.4       137       180        97
WVCT   2025130    131400   -8.4000 -137.1200      13.9       135       197        92
WVCT   2025130    131400   -8.4500 -137.2800       9.4       131       210        88
WVCT   2025130    131400   -8.4700 -137.3000       8.4       130       209        87
WVCT   2025130    131400   -8.4300 -137.4300       5.8        76       176        61
WVCT   2025130    131400   -8.4700 -137.5200       6.1        58       156        69
WVCT   2025130    131400   -8.4700 -137.7400       6.2        51       151        65
WVCT   2025130    131400   -8.4500 -137.9000       6.2         5       190        76
WVCT   2025130    131400   -8.4300 -137.9400       7.6         1       209        94
WVCT   2025130    131400   -8.4300 -138.0700       9.5       352       226        82
WVCT   2025130    131400   -8.4500 -138.2000       5.9       339       225        76
WVCT   2025130    131400   -8.4100 -138.2900       7.1       326       227        78
WVCT   2025130    131400   -8.4100 -138.3600       7.7       347       227        81
WVCT   2025130    131400   -8.4100 -138.4500       7.4       327       222        67
WVCT   2025130    131400   -8.4700 -139.8200       6.4        83       203        85
WVCT   2025130    131400   -8.3900 -140.1100       5.7        44       196        77
WVCT   2025130    131400   -8.4100 -140.1500       5.6        47       196        77
WVCT   2025130    131400   -8.4500 -140.2400       6.1        48       209        75
WVCT   2025130    131400   -8.4500 -140.3600       8.5        56       226        79
WVCT   2025130    131400   -8.4100 -140.4500      10.7        57       224        68
WVCT   2025130    131400   -8.4300 -140.5600      11.9        57       224        79
WVCT   2025130    131400   -8.3900 -140.6000      12.6        52       224        98
WVCT   2025130    131400   -8.3900 -140.6700      11.4        46       223        98
WVCT   2025130    131400   -8.4700 -140.8400       5.7       317       218        84
WVCT   2025130    131400   -8.4700 -140.8500       5.6       311       217        83
WVCT   2025130    131400   -8.3900 -140.9500       8.9        13       193        99
WVCT   2025130    131400   -8.4100 -141.0500       5.6        40       191        97
WVCT   2025130    131400   -8.4700 -141.1800       8.1        67       190       100
WVCT   2025130    131400   -8.3900 -141.2500       8.6        67       188        98
WVCT   2025130    131400   -8.3900 -141.3300       7.2        70       187        83
WVCT   2025130    131400   -8.5800 -132.7900       4.0        83       210        86
WVCT   2025130    131400   -8.5800 -133.0300       4.0        93       214        94
WVCT   2025130    131400   -8.5800 -133.1700       6.2        93       220        98
WVCT   2025130    131400   -8.5800 -133.2100       6.6        93       216        97
WVCT   2025130    131400   -8.5000 -133.3100       6.8       100       217       100
WVCT   2025130    131400   -8.5600 -133.4000       5.5        86       214        93
WVCT   2025130    131400   -8.5300 -135.4600      10.3       117       231        75
WVCT   2025130    131400   -8.4900 -135.5500      10.5       105       231        99
WVCT   2025130    131400   -8.5300 -135.6400      11.1       110       228        97
WVCT   2025130    131400   -8.5100 -135.6600      11.9       106       226       100
WVCT   2025130    131400   -8.5500 -135.8000       9.7       105       232        95
WVCT   2025130    131400   -8.4900 -135.8400      11.4        97       224        99
WVCT   2025130    131400   -8.4900 -135.9300      11.7        89       226        98
WVCT   2025130    131400   -8.5100 -136.0800      11.3        82       223        93
WVCT   2025130    131400   -8.5700 -136.1300      12.9        88       219        99
WVCT   2025130    131400   -8.5700 -136.2100      13.2        89       214        97
WVCT   2025130    131400   -8.5700 -136.3700      11.9        88       208        88
WVCT   2025130    131400   -8.5600 -136.4600      13.1        99       176        95
WVCT   2025130    131400   -8.5500 -136.4800      13.1       100       176        97
WVCT   2025130    131400   -8.5500 -136.6300      14.7        91       176        97
WVCT   2025130    131400   -8.4900 -136.6800      10.0        97       180        77
WVCT   2025130    131400   -8.4900 -136.8300       7.5       117       175        62
WVCT   2025130    131400   -8.4900 -136.9200       8.6       129       177        91
WVCT   2025130    131400   -8.5300 -136.9400       5.6       131       179        68
WVCT   2025130    131400   -8.5100 -137.0700      13.5       138       179        99
WVCT   2025130    131400   -8.5600 -137.1700      10.0       141       213        94
WVCT   2025130    131400   -8.5600 -137.2100       9.2       142       219        82
WVCT   2025130    131400   -8.5400 -137.3400       5.5       125       210        73
WVCT   2025130    131400   -8.4900 -137.4700       5.7        69       178        93
WVCT   2025130    131400   -8.5100 -137.4800       6.0        66       186        90
WVCT   2025130    131400   -8.5600 -137.5800       4.3        48       180        99
WVCT   2025130    131400   -8.5400 -137.7800       4.7        51       176        80
WVCT   2025130    131400   -8.4900 -137.9800       5.3       356       210        80
WVCT   2025130    131400   -8.5100 -138.0300       4.9         6       210        72
WVCT   2025130    131400   -8.5600 -138.2000       5.2       103       221        62
WVCT   2025130    131400   -8.5600 -138.2900       6.0       101       219        96
WVCT   2025130    131400   -8.5200 -138.3600       5.8        93       219        98
WVCT   2025130    131400   -8.5600 -138.8300       4.3       109       214        65
WVCT   2025130    131400   -8.5600 -138.8500       4.4       100       215        65
WVCT   2025130    131400   -8.5400 -139.0200       6.4        38       222        76
WVCT   2025130    131400   -8.5600 -139.0900       6.5        24       223        84
WVCT   2025130    131400   -8.5600 -139.1300       5.6        21       217        94
WVCT   2025130    131400   -8.5600 -139.7100       5.0        55       185        64
WVCT   2025130    131400   -8.5100 -139.8000       6.2        82       202        92
WVCT   2025130    131400   -8.4900 -139.8700       7.3        86       204        72
WVCT   2025130    131400   -8.5200 -139.9800       4.3        90       203        60
WVCT   2025130    131400   -8.5000 -140.2500       6.7        52       223        76
WVCT   2025130    131400   -8.4900 -140.3100       7.4        57       225        84
WVCT   2025130    131400   -8.5000 -140.4400      11.6        72       226        85
WVCT   2025130    131400   -8.5200 -140.5600       5.8        38       231        99
WVCT   2025130    131400   -8.5200 -140.5800       5.4        25       231        97
WVCT   2025130    131400   -8.5400 -140.7500       7.2       337       226        99
WVCT   2025130    131400   -8.4900 -140.8400       5.9       312       218        94
WVCT   2025130    131400   -8.4900 -140.8500       5.9       304       210        91
WVCT   2025130    131400   -8.4900 -140.9500       5.1       307       192        71
WVCT   2025130    131400   -8.5600 -141.0700       7.2        50       193        99
WVCT   2025130    131400   -8.5200 -141.1800       8.6        70       193       100
WVCT   2025130    131400   -8.4900 -141.2900       6.9        65       196        89
WVCT   2025130    131400   -8.4900 -141.3300       5.7        65       198        81
WVCT   2025130    131400   -8.6000 -132.7700       4.0        82       210        87
WVCT   2025130    131400   -8.6700 -133.0100       4.1       110       210        92
WVCT   2025130    131400   -8.5900 -133.1000       4.8        97       209        98
WVCT   2025130    131400   -8.5900 -133.1700       6.1        94       210        99
WVCT   2025130    131400   -8.6100 -133.2100       6.5        93       207        98
WVCT   2025130    131400   -8.6100 -133.3200       7.5        89       201        98
WVCT   2025130    131400   -8.5900 -135.5600       7.0       141       231        83
WVCT   2025130    131400   -8.6200 -135.6000       5.8       167       228        91
WVCT   2025130    131400   -8.6000 -135.7100       6.8       119       228        73
WVCT   2025130    131400   -8.5800 -135.8200       9.0        99       235        82
WVCT   2025130    131400   -8.6400 -135.9300      11.4        83       228        98
WVCT   2025130    131400   -8.6600 -135.9700      12.5        84       184        91
WVCT   2025130    131400   -8.6600 -136.1300      15.3        96       174        97
WVCT   2025130    131400   -8.6400 -136.1900      15.8        96       174        96
WVCT   2025130    131400   -8.6600 -136.2600      16.3        94       173        97
WVCT   2025130    131400   -8.6600 -136.3300      14.9        91       175        99
WVCT   2025130    131400   -8.6400 -136.5000      14.9        98       173        97
WVCT   2025130    131400   -8.6200 -136.5200      15.4        99       173        97
WVCT   2025130    131400   -8.5800 -136.6100      16.5        94       173        94
WVCT   2025130    131400   -8.5800 -136.7500      13.8        87       174        79
WVCT   2025130    131400   -8.6600 -136.8100       8.5        83       164        92
WVCT   2025130    131400   -8.5800 -137.0500      11.5       134       180        98
WVCT   2025130    131400   -8.6000 -137.1200      10.1       135       181        89
WVCT   2025130    131400   -8.6400 -137.2300       5.0       143       213        98
WVCT   2025130    131400   -8.6600 -137.2800       4.7       132       195        94
WVCT   2025130    131400   -8.6600 -137.3400       4.5       116       195        83
WVCT   2025130    131400   -8.6500 -137.5000       5.4        64       189        90
WVCT   2025130    131400   -8.6200 -138.1000       5.3       104       209        69
WVCT   2025130    131400   -8.6500 -138.2000       7.1       105       209        78
WVCT   2025130    131400   -8.6500 -138.2500       5.9       114       178        96
WVCT   2025130    131400   -8.5800 -138.3400       8.0       101       168        88
WVCT   2025130    131400   -8.6300 -139.0300       7.0        25       227        98
WVCT   2025130    131400   -8.6000 -139.0900       7.5        18       223        97
WVCT   2025130    131400   -8.6200 -139.1600       6.4         8       217        97
WVCT   2025130    131400   -8.6500 -139.6700       4.9        46       168        63
WVCT   2025130    131400   -8.6500 -139.7800       4.9        64       194        89
WVCT   2025130    131400   -8.6200 -139.8000       5.8        80       201        97
WVCT   2025130    131400   -8.6500 -140.1800       4.1         6       222        96
WVCT   2025130    131400   -8.5800 -140.2500       5.6        43       224        83
WVCT   2025130    131400   -8.5800 -140.3100       7.4        58       225        89
WVCT   2025130    131400   -8.5800 -140.4000      10.3        68       224       100
WVCT   2025130    131400   -8.5800 -140.4700      11.1        67       226        96
WVCT   2025130    131400   -8.6500 -140.6400       7.4        11       229        64
WVCT   2025130    131400   -8.6500 -140.6500       7.2         7       228        67
WVCT   2025130    131400   -8.6300 -140.7500       6.7       340       220        99
WVCT   2025130    131400   -8.6300 -140.8700       4.8       312       183        91
WVCT   2025130    131400   -8.6300 -141.0000      11.2        48       186        91
WVCT   2025130    131400   -8.6200 -141.0200      10.3        42       190        90
WVCT   2025130    131400   -8.6300 -141.1500      10.9        63       213        90
WVCT   2025130    131400   -8.6000 -141.2600       9.9        69       216        99
WVCT   2025130    131400   -8.6500 -141.2900      10.2        72       218        99
WVCT   2025130    131400   -8.7600 -133.0000       4.3       116       215        90
WVCT   2025130    131400   -8.7400 -133.0800       4.3       111       214        94
WVCT   2025130    131400   -8.7600 -133.1300       4.0       109       214        99
WVCT   2025130    131400   -8.7000 -133.2100       5.1        89       198        98
WVCT   2025130    131400   -8.6900 -133.3400       7.1        80       195        96
WVCT   2025130    131400   -8.7600 -133.4500       6.1        66       214       100
WVCT   2025130    131400   -8.7400 -133.4800       5.7        53       214        92
WVCT   2025130    131400   -8.7400 -133.7400       6.0       103       216        82
WVCT   2025130    131400   -8.7600 -133.8700       6.0       107       216        96
WVCT   2025130    131400   -8.7600 -133.8900       5.5       108       216        82
WVCT   2025130    131400   -8.7000 -135.8200       8.9        52       230        95
WVCT   2025130    131400   -8.7300 -135.9100      11.8        70       184        90
WVCT   2025130    131400   -8.7500 -136.0000      13.5        88       183        92
WVCT   2025130    131400   -8.6900 -136.0900      15.6        95       176        97
WVCT   2025130    131400   -8.7500 -136.1300      13.2       104       175        64
WVCT   2025130    131400   -8.6800 -136.2800      16.0        93       173        97
WVCT   2025130    131400   -8.6800 -136.3500      14.7        91       174       100
WVCT   2025130    131400   -8.6900 -136.3900      14.4        91       172        98
WVCT   2025130    131400   -8.6800 -136.5100      15.0        97       171        97
WVCT   2025130    131400   -8.6800 -136.6400      18.4        87       164        74
WVCT   2025130    131400   -8.7300 -136.7000      14.7        86       157        84
WVCT   2025130    131400   -8.7100 -136.7700      11.2        87       158        74
WVCT   2025130    131400   -8.6900 -137.0100       4.2       242       162        69
WVCT   2025130    131400   -8.6700 -137.3400       4.3       116       184        90
WVCT   2025130    131400   -8.6900 -137.4600       4.4        66       182        83
WVCT   2025130    131400   -8.6900 -137.5600       4.7        59       192        89
WVCT   2025130    131400   -8.7100 -137.5700       4.4        55       187        80
WVCT   2025130    131400   -8.7500 -138.1000       6.8       109       194        81
WVCT   2025130    131400   -8.7300 -138.1200       6.9       106       196        83
WVCT   2025130    131400   -8.6700 -138.2100       7.2       103       192        90
WVCT   2025130    131400   -8.6700 -139.1100       7.4        13       223        98
WVCT   2025130    131400   -8.6900 -139.1400       7.3        16       221        94
WVCT   2025130    131400   -8.7400 -139.2200       6.3        42       199        96
WVCT   2025130    131400   -8.7400 -139.6900       5.2        36       171        99
WVCT   2025130    131400   -8.7300 -139.7600       5.2        47       193       100
WVCT   2025130    131400   -8.7100 -139.9300       8.6        36       203        92
WVCT   2025130    131400   -8.7400 -139.9400       8.3        33       202        92
WVCT   2025130    131400   -8.6700 -140.2700       6.6        24       225       100
WVCT   2025130    131400   -8.6900 -140.3100       7.4        25       224        99
WVCT   2025130    131400   -8.7400 -140.4400      12.1        31       222       100
WVCT   2025130    131400   -8.7400 -140.5600      13.3        29       211        97
WVCT   2025130    131400   -8.7300 -140.6200      11.6        23       217        90
WVCT   2025130    131400   -8.7400 -140.7300       7.4         9       211        98
WVCT   2025130    131400   -8.7300 -140.7600       5.9         0       206        93
WVCT   2025130    131400   -8.7400 -140.9100       5.4        57       183       100
WVCT   2025130    131400   -8.6700 -141.0200      12.9        60       191        85
WVCT   2025130    131400   -8.7400 -141.1500      11.9        78       197        66
WVCT   2025130    131400   -8.7300 -141.2700      11.1        78       216        98
WVCT   2025130    131400   -8.6700 -141.3100      10.3        73       217       100
WVCT   2025130    131400   -8.7800 -133.0000       4.3       117       214        91
WVCT   2025130    131400   -8.7800 -133.0200       4.3       116       213        90
WVCT   2025130    131400   -8.8500 -133.3200       5.6        89       211        99
WVCT   2025130    131400   -8.8500 -133.3900       6.4        79       214        92
WVCT   2025130    131400   -8.8000 -133.4800       5.6        66       214        99
WVCT   2025130    131400   -8.8500 -133.6300       5.7        97       215        91
WVCT   2025130    131400   -8.8300 -133.7400       5.8       107       215        97
WVCT   2025130    131400   -8.7900 -133.8200       6.3       100       216        98
WVCT   2025130    131400   -8.8400 -135.7400       5.1        63       219        79
WVCT   2025130    131400   -8.8400 -135.8400       8.7        57       202        67
WVCT   2025130    131400   -8.8400 -135.9300      10.9        69       190        80
WVCT   2025130    131400   -8.7700 -136.0200      13.5        90       183        92
WVCT   2025130    131400   -8.7700 -136.1100      11.6       119       177        98
WVCT   2025130    131400   -8.7700 -136.1300      11.5       120       176        97
WVCT   2025130    131400   -8.8400 -136.2200       9.8       119       170        78
WVCT   2025130    131400   -8.7900 -136.3500      14.2        88       167        81
WVCT   2025130    131400   -8.7900 -136.4400      13.5        85       160       100
WVCT   2025130    131400   -8.7700 -136.5000      13.3        87       160        99
WVCT   2025130    131400   -8.8000 -136.6000      13.1        86       147        84
WVCT   2025130    131400   -8.8400 -136.7100      11.0        95       150        97
WVCT   2025130    131400   -8.8400 -136.8100       4.4        85       149        74
WVCT   2025130    131400   -8.7700 -137.0100       5.4       256       143        63
WVCT   2025130    131400   -8.7800 -138.0800       6.5       115       201        71
WVCT   2025130    131400   -8.7600 -138.1400       7.3       108       190        85
WVCT   2025130    131400   -8.7800 -139.1400       4.4        45       216        95
WVCT   2025130    131400   -8.8200 -139.4700       6.3        15       155        73
WVCT   2025130    131400   -8.7600 -139.5600       4.7        22       155        96
WVCT   2025130    131400   -8.8000 -139.7100       6.3        25       184       100
WVCT   2025130    131400   -8.7600 -139.8000       6.7        41       200        99
WVCT   2025130    131400   -8.8400 -139.9400       7.8        41       202        81
WVCT   2025130    131400   -8.8200 -139.9600       7.8        37       202        78
WVCT   2025130    131400   -8.8000 -140.1300       6.6         7       225       100
WVCT   2025130    131400   -8.8000 -140.1400       6.4         2       225        99
WVCT   2025130    131400   -8.7800 -140.2500       5.7         8       224        90
WVCT   2025130    131400   -8.8000 -140.3300       6.1        16       220        98
WVCT   2025130    131400   -8.7800 -140.4500      10.4        33       221       100
WVCT   2025130    131400   -8.8400 -140.5500       9.8        34       208        99
WVCT   2025130    131400   -8.7600 -140.6400      11.5        23       213        91
WVCT   2025130    131400   -8.7600 -140.7100       8.5        15       211       100
WVCT   2025130    131400   -8.7600 -141.0400      11.8        75       191        92
WVCT   2025130    131400   -8.7800 -141.1300      12.1        79       197        77
WVCT   2025130    131400   -8.7600 -141.1600      11.4        77       200        65
WVCT   2025130    131400   -8.8200 -141.2400      12.3        80       213        99
WVCT   2025130    131400   -8.8000 -141.4000      12.4        72       217       100
WVCT   2025130    131400   -8.8700 -133.2400       4.1        94       210       100
WVCT   2025130    131400   -8.8700 -133.3300       5.8        85       213        98
WVCT   2025130    131400   -8.9400 -133.3900       5.8        83       213       100
WVCT   2025130    131400   -8.9200 -133.5500       6.0        96       215        95
WVCT   2025130    131400   -8.9400 -133.6100       6.3        98       216        99
WVCT   2025130    131400   -8.8700 -133.7200       5.7       108       215        99
WVCT   2025130    131400   -8.9100 -133.7600       5.7       113       214       100
WVCT   2025130    131400   -8.9000 -135.6100       4.3       127       236        60
WVCT   2025130    131400   -8.9400 -135.7100       7.7       101       243        83
WVCT   2025130    131400   -8.9400 -135.8200       9.7        78       205        92
WVCT   2025130    131400   -8.9400 -135.8500       9.9        74       201        94
WVCT   2025130    131400   -8.8800 -135.9800       9.1        79       186        98
WVCT   2025130    131400   -8.8600 -136.0400       8.6        93       184       100
WVCT   2025130    131400   -8.9200 -136.1800      11.7       116       173        93
WVCT   2025130    131400   -8.9000 -136.2000      11.6       121       172        93
WVCT   2025130    131400   -8.9000 -136.2900      12.0       112       159        97
WVCT   2025130    131400   -8.8600 -136.4400      12.7        78       153        85
WVCT   2025130    131400   -8.9000 -136.5500      13.1        99       141        92
WVCT   2025130    131400   -8.9000 -136.6200      13.6       102       141        88
WVCT   2025130    131400   -8.9000 -136.7100      11.9        96       145        98
WVCT   2025130    131400   -8.8600 -136.7500       8.4        94       149        98
WVCT   2025130    131400   -8.9300 -136.9700       4.8       281       132        71
WVCT   2025130    131400   -8.9100 -137.1000       5.4       105       126        60
WVCT   2025130    131400   -8.8900 -138.7400       7.7         5       117        71
WVCT   2025130    131400   -8.8900 -139.5600       5.4        16       158        99
WVCT   2025130    131400   -8.8900 -139.6000       5.6        15       159        99
WVCT   2025130    131400   -8.8900 -139.6700       6.7        14       196        98
WVCT   2025130    131400   -8.9100 -139.8300       7.6        44       195        99
WVCT   2025130    131400   -8.9300 -139.8900       6.7        55       197        82
WVCT   2025130    131400   -8.8700 -139.9400       7.5        45       200        79
WVCT   2025130    131400   -8.8900 -140.0700       8.8         9       219        93
WVCT   2025130    131400   -8.8900 -140.2000       6.0       352       224        94
WVCT   2025130    131400   -8.8500 -140.2200       4.5       352       224        95
WVCT   2025130    131400   -8.9300 -140.3400       4.5        52       223        86
WVCT   2025130    131400   -8.8500 -140.4500       4.4        51       219        93
WVCT   2025130    131400   -8.8500 -140.5500       8.6        34       208        99
WVCT   2025130    131400   -8.9300 -140.5800       6.7        31       209        97
WVCT   2025130    131400   -8.9100 -140.6900      10.3        32       208        92
WVCT   2025130    131400   -8.8500 -140.8000       6.5        31       207        99
WVCT   2025130    131400   -8.9300 -140.8900       6.8        52       207        86
WVCT   2025130    131400   -8.8900 -140.9500       7.1        63       207        91
WVCT   2025130    131400   -8.9100 -141.0600      11.5        68       210        91
WVCT   2025130    131400   -8.9100 -141.1600      12.9        76       222        93
WVCT   2025130    131400   -8.8700 -141.2900      12.9        75       216        99
WVCT   2025130    131400   -8.9100 -141.3100      12.8        71       216        99
WVCT   2025130    131400   -9.0200 -133.2800       4.3        67       208        83
WVCT   2025130    131400   -9.0000 -133.3100       4.7        76       210        94
WVCT   2025130    131400   -9.0200 -133.4600       5.6       104       216       100
WVCT   2025130    131400   -9.0000 -133.5000       6.0        99       217        98
WVCT   2025130    131400   -8.9600 -133.5900       6.6        95       217        99
WVCT   2025130    131400   -8.9600 -133.7400       6.6       104       216        94
WVCT   2025130    131400   -8.9500 -135.6500       7.5       106       253        87
WVCT   2025130    131400   -8.9500 -135.6700       8.0       104       250        86
WVCT   2025130    131400   -8.9500 -135.8300      10.4        79       202        91
WVCT   2025130    131400   -9.0100 -135.8500      12.1        79       183        97
WVCT   2025130    131400   -8.9500 -135.9800      11.3        77       183       100
WVCT   2025130    131400   -9.0300 -136.0300      15.9        92       178        99
WVCT   2025130    131400   -8.9500 -136.1800      12.4       107       172        97
WVCT   2025130    131400   -9.0300 -136.2400      13.6       113       161        97
WVCT   2025130    131400   -8.9700 -136.3800      15.0       105       144        99
WVCT   2025130    131400   -9.0300 -136.4200      17.5       111       144        99
WVCT   2025130    131400   -8.9700 -136.5100      14.7       115       135        92
WVCT   2025130    131400   -9.0300 -136.6200      15.2       114       135       100
WVCT   2025130    131400   -8.9700 -136.7100      13.5       103       140        99
WVCT   2025130    131400   -9.0100 -136.7900       9.9        81       135        67
WVCT   2025130    131400   -9.0100 -137.2800      10.6        96       114        75
WVCT   2025130    131400   -9.0200 -137.3900       8.8       102       119        81
WVCT   2025130    131400   -9.0200 -137.4600       8.1       114       124        83
WVCT   2025130    131400   -8.9700 -137.5400       6.8       124       148        82
WVCT   2025130    131400   -8.9500 -137.6100       6.0       143       149        73
WVCT   2025130    131400   -9.0200 -138.1000       8.9         3       161        99
WVCT   2025130    131400   -9.0000 -138.1400      13.1         2       111        87
WVCT   2025130    131400   -9.0000 -138.2800      18.8        10       103        99
WVCT   2025130    131400   -8.9500 -138.7400      10.8         4       116        81
WVCT   2025130    131400   -8.9500 -138.7900      11.0       351       125        92
WVCT   2025130    131400   -8.9700 -139.5800       4.9        12       160        96
WVCT   2025130    131400   -9.0000 -139.6000       4.9         9       190        94
WVCT   2025130    131400   -8.9700 -139.7400       8.5        17       180        99
WVCT   2025130    131400   -9.0200 -139.7800       7.4        29       171        97
WVCT   2025130    131400   -9.0200 -139.9400       6.5        28       184        93
WVCT   2025130    131400   -8.9500 -140.0300       8.7        11       199        95
WVCT   2025130    131400   -9.0200 -140.0900       9.4        12       217        97
WVCT   2025130    131400   -9.0200 -140.2000       8.4        27       231        89
WVCT   2025130    131400   -9.0200 -140.3100       8.2        46       227        97
WVCT   2025130    131400   -9.0200 -140.3300       8.1        46       226        99
WVCT   2025130    131400   -9.0000 -140.5800       6.3        37       211        90
WVCT   2025130    131400   -8.9800 -140.6500       9.2        41       209        98
WVCT   2025130    131400   -9.0000 -140.6900       9.8        46       209        98
WVCT   2025130    131400   -8.9500 -140.8500       7.9        47       208        93
WVCT   2025130    131400   -8.9500 -140.9500       7.3        59       207        94
WVCT   2025130    131400   -9.0200 -141.0400      11.7        69       207        97
WVCT   2025130    131400   -9.0200 -141.1100      13.3        64       209        98
WVCT   2025130    131400   -8.9500 -141.1600      13.0        72       222        91
WVCT   2025130    131400   -9.0200 -141.3100      12.5        58       214        98
WVCT   2025130    131400   -8.9500 -141.4000      13.5        63       214        99
WVCT   2025130    131400   -9.0500 -133.2700       4.1        70       206        83
WVCT   2025130    131400   -9.0900 -133.3500       4.2       110       213        96
WVCT   2025130    131400   -9.1100 -133.3800       4.8       125       216       100
WVCT   2025130    131400   -9.0500 -133.4800       5.3       109       216        98
WVCT   2025130    131400   -9.1300 -133.6000       8.2        74       218        99
WVCT   2025130    131400   -9.1100 -133.6800      10.1        74       218        98
WVCT   2025130    131400   -9.1300 -133.9200       7.5        84       232        87
WVCT   2025130    131400   -9.1300 -133.9400       8.0        83       232        90
WVCT   2025130    131400   -9.0900 -134.0300      11.0        78       233        75
WVCT   2025130    131400   -9.1200 -134.3800      12.3        63       218        98
WVCT   2025130    131400   -9.1200 -134.4200      11.5        67       217        98
WVCT   2025130    131400   -9.1000 -135.1900       4.5       105       232        66
WVCT   2025130    131400   -9.0800 -135.2800       6.1        93       230        95
WVCT   2025130    131400   -9.0700 -135.5600       5.6        82       224        83
WVCT   2025130    131400   -9.1200 -135.7200      14.6        99       186        97
WVCT   2025130    131400   -9.1000 -135.7600      14.5        98       185        96
WVCT   2025130    131400   -9.0600 -135.8300      13.4        84       182        98
WVCT   2025130    131400   -9.0500 -135.9400      14.1        81       180       100
WVCT   2025130    131400   -9.0800 -136.0500      18.7        95       175       100
WVCT   2025130    131400   -9.1200 -136.1600      16.9       100       169        99
WVCT   2025130    131400   -9.0400 -136.2400      13.8       112       160        96
WVCT   2025130    131400   -9.0400 -136.3600      19.1       107       148        98
WVCT   2025130    131400   -9.0800 -136.4400      18.6       112       144        98
WVCT   2025130    131400   -9.0800 -136.5500      15.8       115       135        98
WVCT   2025130    131400   -9.0400 -136.6000      15.2       115       134        99
WVCT   2025130    131400   -9.0600 -136.7300      12.6        96       133        97
WVCT   2025130    131400   -9.0400 -136.7500      12.2        93       133        99
WVCT   2025130    131400   -9.1000 -136.8400      12.3        81       126        95
WVCT   2025130    131400   -9.1200 -137.2800      11.2        77       104        65
WVCT   2025130    131400   -9.0400 -137.3500       8.9        94       113        86
WVCT   2025130    131400   -9.0400 -137.4600       7.9       113       113        91
WVCT   2025130    131400   -9.0400 -137.5000       7.1       117       109        92
WVCT   2025130    131400   -9.1000 -137.7000       6.6       353       125        95
WVCT   2025130    131400   -9.0400 -138.1000       9.2         2       162       100
WVCT   2025130    131400   -9.0600 -138.1200      10.8       359       160       100
WVCT   2025130    131400   -9.1100 -138.2100      14.6         4       120        95
WVCT   2025130    131400   -9.1000 -138.3200      17.5        10       103        90
WVCT   2025130    131400   -9.1100 -139.2100       4.1        24       200        92
WVCT   2025130    131400   -9.1100 -139.3000       4.8        24       221        96
WVCT   2025130    131400   -9.1100 -139.5600       4.1       359       162        70
WVCT   2025130    131400   -9.1100 -139.6100       5.3         2       189        81
WVCT   2025130    131400   -9.0900 -139.7200       8.2        12       170        97
WVCT   2025130    131400   -9.0400 -139.7600       7.6        22       169       100
WVCT   2025130    131400   -9.0600 -139.9300       5.7        38       182        70
WVCT   2025130    131400   -9.1100 -139.9800       6.6        18       189        98
WVCT   2025130    131400   -9.0600 -140.1100       8.7        16       225        91
WVCT   2025130    131400   -9.0400 -140.2000       8.4        28       233        88
WVCT   2025130    131400   -9.0800 -140.2900       8.3        42       228        99
WVCT   2025130    131400   -9.0800 -140.3100       8.1        43       227       100
WVCT   2025130    131400   -9.0600 -140.4500       4.7        35       220        88
WVCT   2025130    131400   -9.0600 -140.5600       5.2        40       213        78
WVCT   2025130    131400   -9.0400 -140.6500       8.3        50       210        94
WVCT   2025130    131400   -9.1100 -140.7300      10.9        69       214        82
WVCT   2025130    131400   -9.0400 -140.8200       9.3        55       208        98
WVCT   2025130    131400   -9.0800 -140.9300       7.5        51       204        90
WVCT   2025130    131400   -9.0400 -141.0000       9.7        64       204        97
WVCT   2025130    131400   -9.0400 -141.0900      12.9        64       208       100
WVCT   2025130    131400   -9.0600 -141.1600      11.5        57       207        92
WVCT   2025130    131400   -9.1100 -141.2600      11.6        40       201        83
WVCT   2025130    131400   -9.1100 -141.3100      12.4        42       206        86
WVCT   2025130    131400   -9.1700 -132.9200       4.2        80       186        89
WVCT   2025130    131400   -9.2200 -133.0300       6.6        83       201        83
WVCT   2025130    131400   -9.2000 -133.1800       4.7        84       215        98
WVCT   2025130    131400   -9.2000 -133.2000       4.5        85       215        98
WVCT   2025130    131400   -9.1800 -133.2900       4.1       103       216        97
WVCT   2025130    131400   -9.1500 -133.3800       4.5       137       217        97
WVCT   2025130    131400   -9.2000 -133.5500       5.3        76       217        82
WVCT   2025130    131400   -9.1500 -133.6200       8.5        73       217        99
WVCT   2025130    131400   -9.1600 -133.6600       8.0        73       218        98
WVCT   2025130    131400   -9.1400 -133.9000       6.8        86       231        80
WVCT   2025130    131400   -9.2000 -133.9700       9.3        82       231        98
WVCT   2025130    131400   -9.2000 -134.0300      11.5        79       232        98
WVCT   2025130    131400   -9.2200 -134.3400      14.5        57       216        99
WVCT   2025130    131400   -9.1400 -134.4000      12.6        64       216       100
WVCT   2025130    131400   -9.1400 -134.5100      15.2        67       215        86
WVCT   2025130    131400   -9.2200 -134.8900      13.8        62       234       100
WVCT   2025130    131400   -9.2100 -134.9500      13.8        50       233        94
WVCT   2025130    131400   -9.2100 -135.0900       7.5        28       230        79
WVCT   2025130    131400   -9.2100 -135.1700       6.4        50       230        69
WVCT   2025130    131400   -9.1400 -135.2200       4.8        96       233        78
WVCT   2025130    131400   -9.2100 -135.3200       9.7        57       208        67
WVCT   2025130    131400   -9.1800 -135.3900       5.7        46       211        95
WVCT   2025130    131400   -9.1400 -135.4800       4.5        69       216        63
WVCT   2025130    131400   -9.1900 -135.6500      13.4        80       186        65
WVCT   2025130    131400   -9.2100 -135.7400      16.5        90       186        84
WVCT   2025130    131400   -9.1900 -135.7600      16.2        92       185        94
WVCT   2025130    131400   -9.2100 -135.8700      14.7        85       180       100
WVCT   2025130    131400   -9.1900 -135.9900      20.6        82       171        95
WVCT   2025130    131400   -9.1900 -136.0900      21.7        89       171        97
WVCT   2025130    131400   -9.1600 -136.1400      18.7        94       170       100
WVCT   2025130    131400   -9.1700 -136.2900      20.3        99       151       100
WVCT   2025130    131400   -9.2100 -136.3200      20.1        96       151       100
WVCT   2025130    131400   -9.1900 -136.4300      18.2       100       150        98
WVCT   2025130    131400   -9.1400 -136.5300      15.6       108       138       100
WVCT   2025130    131400   -9.1900 -136.6500      12.0        88       128        97
WVCT   2025130    131400   -9.1500 -136.7500      12.3        85       122        95
WVCT   2025130    131400   -9.1700 -136.7600      12.4        84       121        93
WVCT   2025130    131400   -9.2100 -136.9300      10.8        78       120        91
WVCT   2025130    131400   -9.1500 -137.3000      11.8        66       103        62
WVCT   2025130    131400   -9.2100 -137.3100      14.1        50       103        79
WVCT   2025130    131400   -9.1700 -137.4200       6.1        63       103        90
WVCT   2025130    131400   -9.1500 -137.5300       6.6        28       103        92
WVCT   2025130    131400   -9.2100 -137.6200       9.6         2       120        97
WVCT   2025130    131400   -9.1500 -137.7000       9.9       353       129        91
WVCT   2025130    131400   -9.1300 -137.7700       6.2       342       133        69
WVCT   2025130    131400   -9.1300 -138.0800       6.3       349       162        94
WVCT   2025130    131400   -9.1300 -138.1700      12.0         3       158        98
WVCT   2025130    131400   -9.1900 -138.2500      13.8         8       123        93
WVCT   2025130    131400   -9.1300 -138.3200      15.7         7       103        94
WVCT   2025130    131400   -9.2100 -138.9200       5.1       321       135        64
WVCT   2025130    131400   -9.1300 -138.9900       5.7       336       153        95
WVCT   2025130    131400   -9.1300 -139.2000       4.3        16       175        86
WVCT   2025130    131400   -9.2100 -139.2500       4.6         8       191        90
WVCT   2025130    131400   -9.2100 -139.3200       4.2        22       214        92
WVCT   2025130    131400   -9.2100 -139.6300       5.2        14       165        86
WVCT   2025130    131400   -9.2100 -139.6900       6.1        15       170        99
WVCT   2025130    131400   -9.1500 -139.8200       6.2        19       176        99
WVCT   2025130    131400   -9.1700 -139.9200       4.7        24       186        91
WVCT   2025130    131400   -9.2100 -140.0300       6.3        20       199        90
WVCT   2025130    131400   -9.1500 -140.0500       6.5        16       199        94
WVCT   2025130    131400   -9.1300 -140.2200       5.3        39       231        91
WVCT   2025130    131400   -9.1500 -140.2300       4.1        39       228        78
WVCT   2025130    131400   -9.1700 -140.6000       4.1        42       218        84
WVCT   2025130    131400   -9.1300 -140.7500      11.7        74       216        84
WVCT   2025130    131400   -9.1500 -140.7800       9.9        68       215        83
WVCT   2025130    131400   -9.1700 -140.9100       8.6        51       213        97
WVCT   2025130    131400   -9.1700 -140.9600      10.2        50       210        97
WVCT   2025130    131400   -9.1300 -141.0700      11.4        56       206        88
WVCT   2025130    131400   -9.1300 -141.1700      10.1        46       198        91
WVCT   2025130    131400   -9.1900 -141.2900      11.9        36       201        69
WVCT   2025130    131400   -9.2100 -141.3300      12.8        37       201        78
WVCT   2025130    131400   -9.3000 -132.9700       7.4        74       196        87
WVCT   2025130    131400   -9.3000 -133.0800       6.2        79       210        97
WVCT   2025130    131400   -9.2600 -133.1600       5.5        81       217        97
WVCT   2025130    131400   -9.2400 -133.2000       4.9        85       216        94
WVCT   2025130    131400   -9.2400 -133.3100       5.2        93       217        98
WVCT   2025130    131400   -9.2400 -133.6200       5.6        77       217        81
WVCT   2025130    131400   -9.2900 -133.7900       4.2        92       222        81
WVCT   2025130    131400   -9.3100 -133.9100       6.4        92       231        91
WVCT   2025130    131400   -9.2400 -133.9500       8.4        84       232        99
WVCT   2025130    131400   -9.2900 -134.0300       8.4        84       233        99
WVCT   2025130    131400   -9.2900 -134.9100      15.4        59       235        99
WVCT   2025130    131400   -9.3100 -134.9500      16.0        52       236        95
WVCT   2025130    131400   -9.2700 -135.0800      12.5        28       231        95
WVCT   2025130    131400   -9.2300 -135.1300       8.0        33       229        78
WVCT   2025130    131400   -9.2500 -135.2800      11.8        55       208        73
WVCT   2025130    131400   -9.2300 -135.3000      11.0        56       208        67
WVCT   2025130    131400   -9.3100 -135.4600      15.8        57       207        98
WVCT   2025130    131400   -9.2900 -135.5000      15.8        62       208        98
WVCT   2025130    131400   -9.2900 -135.5700      11.8        60       188        69
WVCT   2025130    131400   -9.2300 -135.7200      15.5        88       186        73
WVCT   2025130    131400   -9.2700 -135.7600      15.2        90       186        89
WVCT   2025130    131400   -9.3000 -135.9200      17.0        85       170        99
WVCT   2025130    131400   -9.2900 -135.9400      17.7        83       169        96
WVCT   2025130    131400   -9.2300 -136.0900      22.3        86       170        95
WVCT   2025130    131400   -9.2500 -136.1800      19.1        90       165        98
WVCT   2025130    131400   -9.2800 -136.2500      18.0        89       157        99
WVCT   2025130    131400   -9.3000 -136.3000      18.1        88       152        97
WVCT   2025130    131400   -9.2700 -136.4300      16.8        90       147        99
WVCT   2025130    131400   -9.2300 -136.5100      14.8        92       143        94
WVCT   2025130    131400   -9.2500 -136.6400      12.3        69       128        82
WVCT   2025130    131400   -9.3000 -136.8400      11.7        77       119        96
WVCT   2025130    131400   -9.2500 -136.8900      11.3        80       119        85
WVCT   2025130    131400   -9.2800 -137.1100      14.6        54       111        97
WVCT   2025130    131400   -9.2600 -137.1300      14.8        55       110        91
WVCT   2025130    131400   -9.2600 -137.2600      13.5        53       104        72
WVCT   2025130    131400   -9.2300 -137.4800       6.0        34       105       100
WVCT   2025130    131400   -9.2300 -137.5000       6.2        27       107       100
WVCT   2025130    131400   -9.2400 -137.6200       9.0         3       120        89
WVCT   2025130    131400   -9.2300 -137.7300       9.3       354       129        88
WVCT   2025130    131400   -9.2600 -137.8200       5.4       357       125        61
WVCT   2025130    131400   -9.2400 -138.1900       8.1        41       161        60
WVCT   2025130    131400   -9.2300 -138.2500      12.5        11       133        60
WVCT   2025130    131400   -9.3000 -138.3200      11.8         2       107        95
WVCT   2025130    131400   -9.2400 -138.4300      11.2       352       103        72
WVCT   2025130    131400   -9.2800 -138.5400      15.0        13       103        61
WVCT   2025130    131400   -9.3000 -138.7000      13.1       339       107        70
WVCT   2025130    131400   -9.2800 -138.7700      11.9       344       110        68
WVCT   2025130    131400   -9.2200 -138.9200       5.6       322       135        73
WVCT   2025130    131400   -9.3000 -138.9800       7.0       315       149        99
WVCT   2025130    131400   -9.2200 -139.2100       4.6       358       180        89
WVCT   2025130    131400   -9.3000 -139.5800       4.1        20       166        88
WVCT   2025130    131400   -9.2200 -139.6300       5.0        15       165        87
WVCT   2025130    131400   -9.2800 -139.7100       5.0        19       172       100
WVCT   2025130    131400   -9.3000 -139.8300       5.4         9       180        98
WVCT   2025130    131400   -9.2600 -139.8900       4.8         6       184       100
WVCT   2025130    131400   -9.2200 -140.0300       6.1        16       198        96
WVCT   2025130    131400   -9.2400 -140.0500       6.4        14       197        97
WVCT   2025130    131400   -9.2200 -140.1800       6.5        35       222        94
WVCT   2025130    131400   -9.2600 -140.4900       4.3        37       226        91
WVCT   2025130    131400   -9.2400 -140.5100       4.2        36       226        92
WVCT   2025130    131400   -9.2200 -140.6000       4.1        38       226        90
WVCT   2025130    131400   -9.2800 -140.8600       7.0        43       218        74
WVCT   2025130    131400   -9.2200 -140.8700       7.7        47       215        72
WVCT   2025130    131400   -9.2200 -140.9600      10.7        42       213        99
WVCT   2025130    131400   -9.2200 -141.1300       7.5        44       189        90
WVCT   2025130    131400   -9.2800 -141.1700       5.4        46       183        63
WVCT   2025130    131400   -9.3000 -141.3100      12.1        46       192        78
WVCT   2025130    131400   -9.3700 -132.9700       5.7        69       200        84
WVCT   2025130    131400   -9.3500 -133.0800       5.8        82       208        95
WVCT   2025130    131400   -9.3300 -133.1000       6.1        81       211        94
WVCT   2025130    131400   -9.3500 -133.6400       4.0        98       220        63
WVCT   2025130    131400   -9.3700 -133.7100       4.6       100       220        83
WVCT   2025130    131400   -9.3900 -133.8000       5.9        93       222        97
WVCT   2025130    131400   -9.3300 -133.8800       5.9        93       230        92
WVCT   2025130    131400   -9.4000 -134.0000       5.0        98       234        72
WVCT   2025130    131400   -9.3800 -134.0200       5.2        96       234        84
WVCT   2025130    131400   -9.3600 -134.3600      14.9        59       218        97
WVCT   2025130    131400   -9.4000 -134.4800      14.9        66       218        89
WVCT   2025130    131400   -9.3300 -134.8500      15.5        65       236        92
WVCT   2025130    131400   -9.3600 -135.0000      15.9        44       240        93
WVCT   2025130    131400   -9.3800 -135.0200      15.8        41       243        96
WVCT   2025130    131400   -9.4000 -135.1800      11.1        33       234        98
WVCT   2025130    131400   -9.3800 -135.2000      11.2        36       233        91
WVCT   2025130    131400   -9.3200 -135.3700      15.5        54       206       100
WVCT   2025130    131400   -9.3200 -135.4200      14.9        52       206        97
WVCT   2025130    131400   -9.3200 -135.5300      13.4        59       201        96
WVCT   2025130    131400   -9.3400 -135.6100      14.8        65       186        99
WVCT   2025130    131400   -9.3200 -135.7000      16.5        70       187        99
WVCT   2025130    131400   -9.3200 -135.8100      16.9        84       186        97
WVCT   2025130    131400   -9.3800 -135.8600      17.9        82       177       100
WVCT   2025130    131400   -9.3600 -135.9400      17.1        83       165        96
WVCT   2025130    131400   -9.4000 -136.1000      20.9        85       158        89
WVCT   2025130    131400   -9.3200 -136.1800      19.7        84       163        92
WVCT   2025130    131400   -9.3600 -136.2900      18.1        81       151        96
WVCT   2025130    131400   -9.3400 -136.3000      18.2        84       151        96
WVCT   2025130    131400   -9.4000 -136.4300      17.7        66       143        98
WVCT   2025130    131400   -9.4000 -136.4900      15.7        64       140       100
WVCT   2025130    131400   -9.3600 -136.6200       7.7        88       129        87
WVCT   2025130    131400   -9.3900 -136.8200      12.8        76       116        85
WVCT   2025130    131400   -9.3800 -136.8700      12.5        72       116        70
WVCT   2025130    131400   -9.3200 -137.0900      14.7        52       112        97
WVCT   2025130    131400   -9.3400 -137.1700      14.7        50       109        90
WVCT   2025130    131400   -9.3200 -137.2900      13.8        58       104        66
WVCT   2025130    131400   -9.3500 -138.2100       9.6       349       155        80
WVCT   2025130    131400   -9.3200 -138.3000      10.7       359       125        78
WVCT   2025130    131400   -9.3400 -138.3200      11.2       352       123        93
WVCT   2025130    131400   -9.3900 -138.4400      13.4       342       112        97
WVCT   2025130    131400   -9.3900 -138.5000      15.6       352       113        89
WVCT   2025130    131400   -9.3900 -138.6600      13.7       342       125        81
WVCT   2025130    131400   -9.3900 -138.6800      13.5       339       129        90
WVCT   2025130    131400   -9.3900 -138.8500      11.6       324       155        98
WVCT   2025130    131400   -9.3700 -138.8700      11.1       322       150        99
WVCT   2025130    131400   -9.3200 -138.9800       7.2       313       152        99
WVCT   2025130    131400   -9.3900 -139.0500       7.0       337       166       100
WVCT   2025130    131400   -9.3200 -139.1400       5.3       346       171        94
WVCT   2025130    131400   -9.3900 -139.2300       4.6       358       171        90
WVCT   2025130    131400   -9.3900 -139.4100       5.0       349       158        99
WVCT   2025130    131400   -9.3700 -139.6300       4.1        14       167        90
WVCT   2025130    131400   -9.3900 -139.6900       5.0         9       169        96
WVCT   2025130    131400   -9.3700 -139.8100       6.8        10       180        96
WVCT   2025130    131400   -9.3200 -139.9200       5.8         9       182        98
WVCT   2025130    131400   -9.3700 -140.0700       7.4        21       197        99
WVCT   2025130    131400   -9.3500 -140.1600      11.3        33       203       100
WVCT   2025130    131400   -9.3900 -140.2300      12.2        34       215        98
WVCT   2025130    131400   -9.3200 -140.3600       4.2        29       226        99
WVCT   2025130    131400   -9.3700 -140.4500       5.6        29       224       100
WVCT   2025130    131400   -9.3300 -140.5300       6.2        27       226       100
WVCT   2025130    131400   -9.3500 -140.9600      11.9        33       211        63
WVCT   2025130    131400   -9.3900 -141.2000      14.4        53       188        62
WVCT   2025130    131400   -9.4800 -132.9900       4.2        72       198        67
WVCT   2025130    131400   -9.4800 -133.0000       4.4        75       199        70
WVCT   2025130    131400   -9.4600 -133.1300       5.6        91       202        70
WVCT   2025130    131400   -9.4300 -133.2100       4.5       117       198        98
WVCT   2025130    131400   -9.4200 -133.3400       4.0        83       215       100
WVCT   2025130    131400   -9.5000 -133.4100       4.4        85       217        72
WVCT   2025130    131400   -9.5000 -133.5400       4.3       102       218        83
WVCT   2025130    131400   -9.4800 -133.5600       4.3       106       219        79
WVCT   2025130    131400   -9.4200 -133.7300       5.9       100       219        94
WVCT   2025130    131400   -9.4600 -133.7400       6.3       101       221        99
WVCT   2025130    131400   -9.4200 -133.9100       4.3       102       234        75
WVCT   2025130    131400   -9.4800 -134.1900       9.5        52       239        87
WVCT   2025130    131400   -9.4600 -134.4600      13.3        68       219        91
WVCT   2025130    131400   -9.4200 -134.4800      14.5        66       218        85
WVCT   2025130    131400   -9.4400 -134.9100      15.9        56       240        81
WVCT   2025130    131400   -9.4200 -135.0000      15.7        47       243        91
WVCT   2025130    131400   -9.4400 -135.0500      14.4        39       252        97
WVCT   2025130    131400   -9.4200 -135.1800      10.4        32       233        99
WVCT   2025130    131400   -9.4200 -135.2000       9.9        33       232        94
WVCT   2025130    131400   -9.4500 -135.4600       9.5        44       205        97
WVCT   2025130    131400   -9.4200 -135.5300      11.9        60       188        77
WVCT   2025130    131400   -9.4700 -135.6000       8.8        68       188        67
WVCT   2025130    131400   -9.4900 -135.7000      12.3        64       186        64
WVCT   2025130    131400   -9.4900 -135.8100      17.1        70       181        96
WVCT   2025130    131400   -9.4200 -135.8800      18.3        81       169        99
WVCT   2025130    131400   -9.4700 -135.9700      17.5        83       158        99
WVCT   2025130    131400   -9.4100 -136.0500      20.6        84       157        81
WVCT   2025130    131400   -9.4900 -136.1600      18.3        83       151       100
WVCT   2025130    131400   -9.4300 -136.2300      18.2        75       151        96
WVCT   2025130    131400   -9.4700 -136.3400      19.2        69       142        92
WVCT   2025130    131400   -9.4300 -136.4300      18.0        62       141        98
WVCT   2025130    131400   -9.4700 -136.5000      16.3        60       134       100
WVCT   2025130    131400   -9.4900 -136.6100      11.6        73       131        96
WVCT   2025130    131400   -9.4700 -136.7200       8.1        88       122        74
WVCT   2025130    131400   -9.4300 -136.8300      12.3        74       116        73
WVCT   2025130    131400   -9.4500 -136.8500      12.3        74       116        71
WVCT   2025130    131400   -9.4900 -137.3600      16.6        29       103        71
WVCT   2025130    131400   -9.4800 -137.7100       5.0        40       103        65
WVCT   2025130    131400   -9.4700 -137.9700       5.3       304       116        72
WVCT   2025130    131400   -9.4100 -138.2800      10.8       337       146        91
WVCT   2025130    131400   -9.4100 -138.3400      11.3       336       131        83
WVCT   2025130    131400   -9.4300 -138.4800      14.9       347       116        97
WVCT   2025130    131400   -9.4100 -138.5500      16.1       350       117        85
WVCT   2025130    131400   -9.4100 -138.6500      13.6       345       128        78
WVCT   2025130    131400   -9.4100 -138.6800      13.2       338       133        91
WVCT   2025130    131400   -9.4300 -138.7700      12.1       342       158       100
WVCT   2025130    131400   -9.4100 -138.8800      10.5       317       160        98
WVCT   2025130    131400   -9.4500 -139.0300       9.3       339       167        98
WVCT   2025130    131400   -9.4300 -139.0500       8.6       342       167        98
WVCT   2025130    131400   -9.4800 -139.1900       8.3       351       185        93
WVCT   2025130    131400   -9.4100 -139.2500       4.8         0       171        93
WVCT   2025130    131400   -9.4300 -139.3800       5.3       351       160       100
WVCT   2025130    131400   -9.4800 -139.4300       6.9       353       160        99
WVCT   2025130    131400   -9.4100 -139.5800       4.1       357       168        84
WVCT   2025130    131400   -9.4100 -139.6300       4.8         4       168        90
WVCT   2025130    131400   -9.4100 -139.6900       5.5         6       169        98
WVCT   2025130    131400   -9.4300 -139.8000       7.9        10       175        98
WVCT   2025130    131400   -9.4600 -139.9100       9.1        14       180       100
WVCT   2025130    131400   -9.4100 -140.0900       6.4        20       200        96
WVCT   2025130    131400   -9.4100 -140.2200      12.1        36       215        99
WVCT   2025130    131400   -9.4100 -140.2300      11.8        34       218        99
WVCT   2025130    131400   -9.4300 -140.3600       4.4         4       220        93
WVCT   2025130    131400   -9.4100 -140.5300       6.4        23       219        98
WVCT   2025130    131400   -9.4800 -140.6000       5.4        55       222        98
WVCT   2025130    131400   -9.4800 -141.1300      14.6        42       186        94
WVCT   2025130    131400   -9.4500 -141.1800      15.4        42       186        76
WVCT   2025130    131400   -9.4100 -141.2400      15.3        53       183        70
WVCT   2025130    131400   -9.4100 -141.3700      16.6        56       181       100
WVCT   2025130    131400   -9.5200 -132.9800       4.2        77       199        66
WVCT   2025130    131400   -9.5400 -133.0600       4.8        90       200        99
WVCT   2025130    131400   -9.5200 -133.1000       5.5        86       201        85
WVCT   2025130    131400   -9.5200 -133.2400       4.6        81       185        83
WVCT   2025130    131400   -9.5900 -133.3500       4.2        99       214        86
WVCT   2025130    131400   -9.5900 -133.3700       4.1        94       214        85
WVCT   2025130    131400   -9.5200 -133.5400       4.5       101       218        86
WVCT   2025130    131400   -9.5200 -133.5600       4.7       104       218        88
WVCT   2025130    131400   -9.5300 -133.6500       6.1       109       218        98
WVCT   2025130    131400   -9.5900 -133.8000       4.2       103       227        94
WVCT   2025130    131400   -9.5900 -134.3500      13.0        78       220        98
WVCT   2025130    131400   -9.5300 -134.4100      13.1        78       221        98
WVCT   2025130    131400   -9.5900 -134.5000      13.0        94       220        99
WVCT   2025130    131400   -9.5800 -134.9000      13.1        48       239        99
WVCT   2025130    131400   -9.5500 -134.9400      14.3        46       244        99
WVCT   2025130    131400   -9.5300 -135.0300      13.4        49       246        98
WVCT   2025130    131400   -9.5800 -135.1800      12.2        45       210        99
WVCT   2025130    131400   -9.5700 -135.2000      10.8        42       209        86
WVCT   2025130    131400   -9.5300 -135.7300      13.6        68       184        69
WVCT   2025130    131400   -9.5800 -135.8000      15.5        89       179        94
WVCT   2025130    131400   -9.5800 -135.8800      17.8        84       163       100
WVCT   2025130    131400   -9.5600 -136.0100      20.6        81       155       100
WVCT   2025130    131400   -9.5600 -136.0800      20.4        87       153       100
WVCT   2025130    131400   -9.5800 -136.1400      19.1        86       150       100
WVCT   2025130    131400   -9.5400 -136.2300      17.3        81       137       100
WVCT   2025130    131400   -9.5600 -136.3400      18.1        72       135        98
WVCT   2025130    131400   -9.5800 -136.4100      17.0        70       134       100
WVCT   2025130    131400   -9.5200 -136.4800      16.5        63       134       100
WVCT   2025130    131400   -9.5800 -136.6300      14.6        68       130        99
WVCT   2025130    131400   -9.5600 -136.6700      12.4        72       130        83
WVCT   2025130    131400   -9.5800 -136.7800       9.8        78       114        83
WVCT   2025130    131400   -9.5800 -136.8900      10.9        63       105        77
WVCT   2025130    131400   -9.5800 -138.1100       9.7       331       135        65
WVCT   2025130    131400   -9.5400 -138.1700      11.6       331       135        65
WVCT   2025130    131400   -9.5000 -138.2200      12.9       332       142        81
WVCT   2025130    131400   -9.5000 -138.3900      11.0       326       129        96
WVCT   2025130    131400   -9.5600 -138.4300      10.1       331       131        89
WVCT   2025130    131400   -9.5600 -138.5400      10.6       343       143        84
WVCT   2025130    131400   -9.5400 -138.5900      11.3       341       151        87
WVCT   2025130    131400   -9.5000 -138.7200      11.9       339       166        98
WVCT   2025130    131400   -9.5400 -138.7700      11.4       343       176       100
WVCT   2025130    131400   -9.5000 -138.9400       9.8       327       176        91
WVCT   2025130    131400   -9.5000 -139.0100      10.8       339       172        96
WVCT   2025130    131400   -9.5600 -139.1000      12.3       347       181        95
WVCT   2025130    131400   -9.5200 -139.2100       9.0       347       187        87
WVCT   2025130    131400   -9.5400 -139.2300       9.0       347       186        86
WVCT   2025130    131400   -9.5600 -139.3800       8.0       354       162       100
WVCT   2025130    131400   -9.5000 -139.4300       7.2       356       160        99
WVCT   2025130    131400   -9.5600 -139.5200       6.7       356       167        83
WVCT   2025130    131400   -9.5800 -139.6500       7.1       357       170        77
WVCT   2025130    131400   -9.5400 -139.7000       8.5         0       168        86
WVCT   2025130    131400   -9.5200 -139.8100       9.0         9       174        99
WVCT   2025130    131400   -9.5700 -139.9200       6.5        20       183       100
WVCT   2025130    131400   -9.5200 -140.5800       4.4        54       217        86
WVCT   2025130    131400   -9.5000 -140.6200       5.3        57       226        97
WVCT   2025130    131400   -9.5600 -140.9600      14.5        57       197        97
WVCT   2025130    131400   -9.5700 -141.1300      14.2        43       189       100
WVCT   2025130    131400   -9.5700 -141.1500      14.4        41       188       100
WVCT   2025130    131400   -9.5400 -141.2900      14.7        39       180        98
WVCT   2025130    131400   -9.5600 -141.3300      12.9        41       176        99
WVCT   2025130    131400   -9.6900 -132.9200       5.7        69       201        95
WVCT   2025130    131400   -9.6700 -133.0000       4.8        70       199        99
WVCT   2025130    131400   -9.6100 -133.0900       4.5        71       192        94
WVCT   2025130    131400   -9.6700 -133.2600       4.1        79       205        67
WVCT   2025130    131400   -9.6100 -133.3500       4.2        97       214        88
WVCT   2025130    131400   -9.6500 -133.3700       4.1        88       214        83
WVCT   2025130    131400   -9.6500 -133.5400       4.1        93       217        77
WVCT   2025130    131400   -9.6100 -133.6300       5.8       104       218       100
WVCT   2025130    131400   -9.6100 -133.6500       5.8       102       218       100
WVCT   2025130    131400   -9.6100 -133.8200       4.2       103       228        91
WVCT   2025130    131400   -9.6400 -133.8700       4.7       109       233        94
WVCT   2025130    131400   -9.6400 -134.1100       6.3        87       232        65
WVCT   2025130    131400   -9.6600 -134.2800      13.8        65       223       100
WVCT   2025130    131400   -9.6400 -134.3300      13.7        72       219        99
WVCT   2025130    131400   -9.6100 -134.4100      13.6        83       219        96
WVCT   2025130    131400   -9.6100 -134.4800      12.6        92       220        99
WVCT   2025130    131400   -9.6000 -134.8800      12.3        51       236        99
WVCT   2025130    131400   -9.6000 -135.0000      12.9        54       239        94
WVCT   2025130    131400   -9.6200 -135.0900      14.3        56       227        99
WVCT   2025130    131400   -9.6800 -135.1200      15.4        55       210        99
WVCT   2025130    131400   -9.6800 -135.2300      13.7        51       208        79
WVCT   2025130    131400   -9.6600 -135.3100       6.1        34       207        77
WVCT   2025130    131400   -9.6400 -135.4400       7.7        29       190        61
WVCT   2025130    131400   -9.6600 -135.6200      15.4        27       190        61
WVCT   2025130    131400   -9.6000 -135.7300      11.5        82       183        66
WVCT   2025130    131400   -9.6000 -135.8000      15.3        89       179        98
WVCT   2025130    131400   -9.6600 -135.9100      21.3        74       168        99
WVCT   2025130    131400   -9.6700 -135.9300      21.6        73       168       100
WVCT   2025130    131400   -9.6200 -136.0800      20.4        87       153       100
WVCT   2025130    131400   -9.6000 -136.1200      19.4        87       151       100
WVCT   2025130    131400   -9.6200 -136.2100      17.9        86       133        99
WVCT   2025130    131400   -9.6200 -136.3400      18.0        76       133        98
WVCT   2025130    131400   -9.6200 -136.4300      16.9        71       132        99
WVCT   2025130    131400   -9.6700 -136.5600      16.2        66       128        97
WVCT   2025130    131400   -9.6700 -136.6500      15.8        70       129       100
WVCT   2025130    131400   -9.6400 -136.6700      14.7        69       128        99
WVCT   2025130    131400   -9.6300 -136.8100       9.6        60       112        76
WVCT   2025130    131400   -9.6700 -137.6400       9.1        97       103        94
WVCT   2025130    131400   -9.6300 -137.7300       7.6        71       103        73
WVCT   2025130    131400   -9.6300 -138.1000      12.4       341       132        90
WVCT   2025130    131400   -9.6000 -138.1500      11.5       332       136        76
WVCT   2025130    131400   -9.6700 -138.2200      14.3       329       136        74
WVCT   2025130    131400   -9.6700 -138.3700       9.0        10       142        97
WVCT   2025130    131400   -9.6300 -138.4800       8.8       358       151        93
WVCT   2025130    131400   -9.6100 -138.5000       9.1       352       151        88
WVCT   2025130    131400   -9.6300 -138.6600      11.7       337       167       100
WVCT   2025130    131400   -9.6100 -138.7500      12.8       345       172       100
WVCT   2025130    131400   -9.6300 -138.7700      13.1       348       175        99
WVCT   2025130    131400   -9.6700 -138.9400      11.8       342       186        66
WVCT   2025130    131400   -9.6300 -138.9700      13.0       343       185        77
WVCT   2025130    131400   -9.5900 -139.0800      12.6       347       182        84
WVCT   2025130    131400   -9.5900 -139.1600      11.3       350       185        96
WVCT   2025130    131400   -9.5900 -139.3000       8.3       356       160        93
WVCT   2025130    131400   -9.6300 -139.3800       8.5       357       161       100
WVCT   2025130    131400   -9.6100 -139.4500       7.7         0       165        88
WVCT   2025130    131400   -9.6700 -139.5000       8.2       357       168        99
WVCT   2025130    131400   -9.6300 -139.6700       6.6       360       169        83
WVCT   2025130    131400   -9.5900 -139.7000       7.9         2       169        87
WVCT   2025130    131400   -9.6700 -139.7800       6.1         5       174        90
WVCT   2025130    131400   -9.5900 -139.9100       6.0        17       181        99
WVCT   2025130    131400   -9.6500 -139.9600       4.8         9       184        93
WVCT   2025130    131400   -9.6700 -140.0900       8.3        18       201        92
WVCT   2025130    131400   -9.6700 -140.2000       8.6        23       202        97
WVCT   2025130    131400   -9.6300 -140.6900       6.6        17       226        97
WVCT   2025130    131400   -9.6300 -140.9300      16.3        49       208        99
WVCT   2025130    131400   -9.6700 -141.1100      13.3        55       200        97
WVCT   2025130    131400   -9.6700 -141.1300      12.9        55       192        99
WVCT   2025130    131400   -9.5900 -141.2400      13.8        37       184        97
WVCT   2025130    131400   -9.5900 -141.3800      10.9        42       175        96
WVCT   2025130    131400   -9.7800 -132.7400       5.7        40       203       100
WVCT   2025130    131400   -9.7800 -132.8100       6.5        47       200        99
WVCT   2025130    131400   -9.7200 -132.9200       6.6        70       200        91
WVCT   2025130    131400   -9.7200 -133.0700       4.6        68       196        86
WVCT   2025130    131400   -9.7800 -133.1400       4.5        85       210        79
WVCT   2025130    131400   -9.7200 -133.2400       4.8        76       211        74
WVCT   2025130    131400   -9.7800 -133.3300       4.2        81       215        91
WVCT   2025130    131400   -9.7600 -133.5700       4.3        99       216        77
WVCT   2025130    131400   -9.7700 -133.7200       4.9        93       220        98
WVCT   2025130    131400   -9.7700 -133.7600       4.6        98       222       100
WVCT   2025130    131400   -9.7200 -133.9000       4.8       118       233        73
WVCT   2025130    131400   -9.7000 -134.1100       6.7        98       230        66
WVCT   2025130    131400   -9.7700 -134.3300      16.3        57       215        99
WVCT   2025130    131400   -9.7500 -134.4000      14.7        71       215        99
WVCT   2025130    131400   -9.7500 -134.4800      14.0        76       218        98
WVCT   2025130    131400   -9.7000 -134.9000      10.5        67       239        97
WVCT   2025130    131400   -9.7000 -134.9900      11.9        62       242        90
WVCT   2025130    131400   -9.7700 -135.0800      14.0        54       227        94
WVCT   2025130    131400   -9.7300 -135.1600      14.3        56       209        98
WVCT   2025130    131400   -9.6900 -135.2300      12.9        54       208        76
WVCT   2025130    131400   -9.7500 -135.3100       7.8        58       206        66
WVCT   2025130    131400   -9.6900 -135.4200       5.1        20       190        81
WVCT   2025130    131400   -9.6900 -135.6400      16.0        29       189        60
WVCT   2025130    131400   -9.6900 -135.7300      11.0        77       180        69
WVCT   2025130    131400   -9.7700 -135.8200      23.5        77       174        97
WVCT   2025130    131400   -9.7500 -135.8600      21.3        74       172       100
WVCT   2025130    131400   -9.6900 -135.9500      21.3        72       168        99
WVCT   2025130    131400   -9.7700 -136.0400      16.3        72       158        97
WVCT   2025130    131400   -9.6900 -136.1700      18.4        85       135        98
WVCT   2025130    131400   -9.7700 -136.2800      17.7        79       137       100
WVCT   2025130    131400   -9.7700 -136.3000      17.7        79       136        99
WVCT   2025130    131400   -9.7300 -136.4500      16.9        70       132       100
WVCT   2025130    131400   -9.7100 -136.5600      16.0        66       127        98
WVCT   2025130    131400   -9.7300 -136.6300      15.9        68       128       100
WVCT   2025130    131400   -9.7300 -136.6800      15.3        69       129       100
WVCT   2025130    131400   -9.7600 -136.7800      12.6        67       125        93
WVCT   2025130    131400   -9.7500 -137.0100      14.7        28       104        65
WVCT   2025130    131400   -9.7400 -137.2500      17.8        49       103        96
WVCT   2025130    131400   -9.7100 -137.6400       9.1        97       103        94
WVCT   2025130    131400   -9.7300 -137.6700       8.2        90       103        99
WVCT   2025130    131400   -9.7300 -137.7800      14.3        89       103        82
WVCT   2025130    131400   -9.7400 -138.0600      19.0         1       122        68
WVCT   2025130    131400   -9.7600 -138.2000      14.4       326       131        99
WVCT   2025130    131400   -9.7600 -138.2600      12.4       325       131        98
WVCT   2025130    131400   -9.7600 -138.3700      10.2       351       143        92
WVCT   2025130    131400   -9.7400 -138.4100       9.1       359       149        99
WVCT   2025130    131400   -9.6900 -138.5700       9.7       346       166        95
WVCT   2025130    131400   -9.7100 -138.6100      10.7       335       168        97
WVCT   2025130    131400   -9.7200 -138.7500      13.7       340       174        99
WVCT   2025130    131400   -9.7100 -138.7700      13.4       343       175       100
WVCT   2025130    131400   -9.7400 -138.8600      11.1       340       179        92
WVCT   2025130    131400   -9.7200 -138.9900      10.3       340       193        61
WVCT   2025130    131400   -9.6900 -139.0800      10.6       343       156        73
WVCT   2025130    131400   -9.6900 -139.1700       8.5       351       155        91
WVCT   2025130    131400   -9.7000 -139.2700       8.4         5       157        98
WVCT   2025130    131400   -9.7000 -139.3200       8.5         3       159       100
WVCT   2025130    131400   -9.7000 -139.4100       8.8         1       163        99
WVCT   2025130    131400   -9.6900 -139.5000       8.2       358       168       100
WVCT   2025130    131400   -9.7000 -139.6700       6.2       357       169        80
WVCT   2025130    131400   -9.7600 -139.6900       6.4       357       170        94
WVCT   2025130    131400   -9.6900 -139.8100       5.9         3       176        95
WVCT   2025130    131400   -9.6900 -139.9400       5.1         5       183        98
WVCT   2025130    131400   -9.7600 -139.9600       5.5         3       186        99
WVCT   2025130    131400   -9.7200 -140.0700       6.8        19       198        98
WVCT   2025130    131400   -9.7200 -140.2200       6.3        35       201        95
WVCT   2025130    131400   -9.7200 -140.2500       6.0        35       200        93
WVCT   2025130    131400   -9.6900 -140.7100       8.0        17       226        88
WVCT   2025130    131400   -9.7400 -140.8200      13.8        32       217        90
WVCT   2025130    131400   -9.6900 -140.9300      16.6        45       211       100
WVCT   2025130    131400   -9.7400 -140.9600      16.5        43       211       100
WVCT   2025130    131400   -9.6900 -141.1100      13.2        53       201        99
WVCT   2025130    131400   -9.7200 -141.1300      12.2        52       200        99
WVCT   2025130    131400   -9.7200 -141.2600      10.3        47       189       100
WVCT   2025130    131400   -9.6900 -141.3900      10.3        47       186        99
WVCT   2025130    131400   -9.8000 -132.7400       5.8        39       200       100
WVCT   2025130    131400   -9.8200 -132.8500       7.5        51       190        96
WVCT   2025130    131400   -9.8500 -132.9000       9.2        54       187        74
WVCT   2025130    131400   -9.8700 -133.1400       4.7        90       218        90
WVCT   2025130    131400   -9.8000 -133.3100       4.3        82       215        91
WVCT   2025130    131400   -9.7900 -133.5700       4.4        99       214        87
WVCT   2025130    131400   -9.8100 -133.6400       4.8        97       215        93
WVCT   2025130    131400   -9.7900 -133.7400       5.1        93       221        99
WVCT   2025130    131400   -9.8100 -133.8300       5.8        89       227        97
WVCT   2025130    131400   -9.8100 -134.0300       5.2       108       229        82
WVCT   2025130    131400   -9.7900 -134.1400      13.8        57       227        73
WVCT   2025130    131400   -9.8700 -134.2000      15.4        57       224        99
WVCT   2025130    131400   -9.8100 -134.3100      17.3        53       214       100
WVCT   2025130    131400   -9.8100 -134.4000      16.7        58       214       100
WVCT   2025130    131400   -9.8600 -135.0100      14.6        40       236        78
WVCT   2025130    131400   -9.7900 -135.0800      13.9        52       227        95
WVCT   2025130    131400   -9.8200 -135.1600      12.3        54       209        90
WVCT   2025130    131400   -9.7900 -135.2500      10.0        69       208        73
WVCT   2025130    131400   -9.8600 -135.8000      22.9        85       174        94
WVCT   2025130    131400   -9.8600 -135.9500      17.0        75       165       100
WVCT   2025130    131400   -9.8600 -135.9700      16.5        74       164       100
WVCT   2025130    131400   -9.8600 -136.1300      16.5        59       154        83
WVCT   2025130    131400   -9.7800 -136.1700      17.7        72       146        97
WVCT   2025130    131400   -9.7800 -136.2800      17.6        77       141       100
WVCT   2025130    131400   -9.7800 -136.3300      17.5        76       138        99
WVCT   2025130    131400   -9.8000 -136.4400      16.6        67       136       100
WVCT   2025130    131400   -9.8200 -136.5500      15.9        62       132       100
WVCT   2025130    131400   -9.7800 -136.6300      16.2        66       130        99
WVCT   2025130    131400   -9.7800 -136.7700      13.1        65       126        90
WVCT   2025130    131400   -9.8600 -136.8300      14.4        57       123        90
WVCT   2025130    131400   -9.8600 -136.8800      13.4        59       116        88
WVCT   2025130    131400   -9.8600 -137.0300      12.7        52       107        82
WVCT   2025130    131400   -9.8400 -137.3200      16.0        60       103        72
WVCT   2025130    131400   -9.8200 -137.3400      15.1        61       103        61
WVCT   2025130    131400   -9.7800 -137.5600       8.2       110       103        61
WVCT   2025130    131400   -9.7800 -137.8400      12.1         3       104        84
WVCT   2025130    131400   -9.8200 -137.9500      16.1        19       105        93
WVCT   2025130    131400   -9.8500 -138.0200      23.1        17       120        72
WVCT   2025130    131400   -9.8000 -138.1100      17.5       351       133        63
WVCT   2025130    131400   -9.7800 -138.1900      14.9       328       132        99
WVCT   2025130    131400   -9.8200 -138.3100      10.8       329       135        98
WVCT   2025130    131400   -9.8500 -138.4200      11.2       334       149       100
WVCT   2025130    131400   -9.8200 -138.4600      11.2       344       157       100
WVCT   2025130    131400   -9.7800 -138.5700      11.8       341       166        99
WVCT   2025130    131400   -9.7800 -138.7000      14.9       337       174        94
WVCT   2025130    131400   -9.7800 -138.7500      13.4       335       176        92
WVCT   2025130    131400   -9.8200 -138.8100      10.9       331       179        84
WVCT   2025130    131400   -9.8500 -138.9700       7.0       337       203        98
WVCT   2025130    131400   -9.7800 -138.9900       8.2       336       193        70
WVCT   2025130    131400   -9.8200 -139.1400       7.1         1       154        84
WVCT   2025130    131400   -9.8000 -139.2300       9.1        20       156        99
WVCT   2025130    131400   -9.8200 -139.2600       9.4        15       158        99
WVCT   2025130    131400   -9.8200 -139.3900       9.7         5       162        99
WVCT   2025130    131400   -9.8300 -139.4500       9.9         2       163       100
WVCT   2025130    131400   -9.8200 -139.6100       4.8       345       171        61
WVCT   2025130    131400   -9.8500 -139.6900       6.4       354       174        89
WVCT   2025130    131400   -9.8500 -139.7400       7.1       358       174        98
WVCT   2025130    131400   -9.7800 -139.8900       5.5       352       180        98
WVCT   2025130    131400   -9.8000 -139.9600       5.3       360       184       100
WVCT   2025130    131400   -9.8500 -140.0100       5.3        10       193        98
WVCT   2025130    131400   -9.7800 -140.2000       6.3        43       201        94
WVCT   2025130    131400   -9.8000 -140.6500       6.9        29       214        81
WVCT   2025130    131400   -9.8200 -140.6900       9.3        36       218        70
WVCT   2025130    131400   -9.8200 -140.8400      14.7        36       216        93
WVCT   2025130    131400   -9.8300 -140.8900      15.6        38       215        98
WVCT   2025130    131400   -9.8500 -140.9500      16.3        39       214        99
WVCT   2025130    131400   -9.8500 -141.0400      16.9        37       211       100
WVCT   2025130    131400   -9.8300 -141.1800      13.8        28       191        99
WVCT   2025130    131400   -9.8200 -141.2200      12.9        29       189        99
WVCT   2025130    131400   -9.7800 -141.3100      12.5        39       189        99
WVCT   2025130    131400   -9.9300 -132.7300       6.0        36       186        91
WVCT   2025130    131400   -9.9100 -132.8100       6.9        36       186        84
WVCT   2025130    131400   -9.9100 -132.9600       8.7        54       191        67
WVCT   2025130    131400   -9.9400 -133.0700       5.8        72       215        60
WVCT   2025130    131400   -9.9600 -133.0800       5.3        75       216        73
WVCT   2025130    131400   -9.9200 -133.5300       4.0        86       211        95
WVCT   2025130    131400   -9.9400 -133.5700       4.2        83       211        90
WVCT   2025130    131400   -9.9000 -133.6400       5.0        91       211        99
WVCT   2025130    131400   -9.8900 -133.7500       5.3        97       222        87
WVCT   2025130    131400   -9.9000 -133.8800       4.6       103       233        72
WVCT   2025130    131400   -9.9200 -134.0300       9.1        65       226        77
WVCT   2025130    131400   -9.9400 -134.1800      14.1        60       225        95
WVCT   2025130    131400   -9.8800 -134.2000      14.9        58       224        98
WVCT   2025130    131400   -9.9600 -134.2900      13.8        70       215        97
WVCT   2025130    131400   -9.9200 -134.4000      16.6        65       213        98
WVCT   2025130    131400   -9.9400 -134.4700      13.5        69       214        99
WVCT   2025130    131400   -9.8800 -135.0100      13.8        40       235        70
WVCT   2025130    131400   -9.9400 -135.1500       8.4        50       218        78
WVCT   2025130    131400   -9.9400 -135.2800       6.0        81       208        60
WVCT   2025130    131400   -9.9500 -135.4100       7.1        34       198        72
WVCT   2025130    131400   -9.9200 -135.7300      12.2        65       181        89
WVCT   2025130    131400   -9.9300 -135.7400      13.0        58       181        89
WVCT   2025130    131400   -9.8800 -135.8900      17.7        75       167       100
WVCT   2025130    131400   -9.9000 -135.9700      15.7        70       163       100
WVCT   2025130    131400   -9.9300 -136.0200      14.9        59       161        99
WVCT   2025130    131400   -9.9000 -136.1500      16.6        53       155        90
WVCT   2025130    131400   -9.8800 -136.2000      17.8        58       152        89
WVCT   2025130    131400   -9.9300 -136.3500      19.1        44       146        99
WVCT   2025130    131400   -9.9300 -136.4600      18.5        41       141       100
WVCT   2025130    131400   -9.9300 -136.5300      17.6        43       135       100
WVCT   2025130    131400   -9.9500 -136.6300      17.9        45       130       100
WVCT   2025130    131400   -9.8900 -136.7400      18.1        53       127        99
WVCT   2025130    131400   -9.8800 -136.7600      16.8        55       127        98
WVCT   2025130    131400   -9.9100 -136.8800      15.7        47       121        94
WVCT   2025130    131400   -9.9300 -136.9400      14.7        45       114        95
WVCT   2025130    131400   -9.9100 -137.0300      13.1        46       109        82
WVCT   2025130    131400   -9.9500 -137.1200      11.5        71       111        62
WVCT   2025130    131400   -9.9100 -137.2900      17.8        57       103        99
WVCT   2025130    131400   -9.8900 -137.3200      18.2        55       103        98
WVCT   2025130    131400   -9.8900 -137.8900      14.0        15       104        64
WVCT   2025130    131400   -9.9300 -137.9500      12.6        17       109        79
WVCT   2025130    131400   -9.8900 -138.0900      17.3       350       133        81
WVCT   2025130    131400   -9.9300 -138.2000      14.6       326       136        92
WVCT   2025130    131400   -9.8700 -138.2400      12.9       322       135        99
WVCT   2025130    131400   -9.9500 -138.3500      13.0       329       137        98
WVCT   2025130    131400   -9.8700 -138.4400      12.4       338       151       100
WVCT   2025130    131400   -9.9500 -138.5500      12.8       359       165        80
WVCT   2025130    131400   -9.8700 -138.5900      14.0       349       168        97
WVCT   2025130    131400   -9.9500 -138.7500      14.8       348       177        90
WVCT   2025130    131400   -9.9300 -138.7700      13.1       344       178        86
WVCT   2025130    131400   -9.8700 -138.9400       7.2       337       204        99
WVCT   2025130    131400   -9.8700 -138.9700       7.4       339       203       100
WVCT   2025130    131400   -9.9300 -139.0600       9.8       352       201        99
WVCT   2025130    131400   -9.8700 -139.2100       9.9        15       156        96
WVCT   2025130    131400   -9.9300 -139.2800      10.4         9       162        99
WVCT   2025130    131400   -9.9100 -139.3200      10.4        10       163        98
WVCT   2025130    131400   -9.9500 -139.4100       9.4         5       165        95
WVCT   2025130    131400   -9.8700 -139.6700       6.2       354       174        78
WVCT   2025130    131400   -9.8700 -139.6900       6.5       355       174        86
WVCT   2025130    131400   -9.9500 -139.7800       7.0         2       175       100
WVCT   2025130    131400   -9.9100 -139.9400       5.7       350       181        97
WVCT   2025130    131400   -9.8900 -139.9600       5.6       355       183        98
WVCT   2025130    131400   -9.8900 -140.0900       6.4        41       198        81
WVCT   2025130    131400   -9.9400 -140.1400       5.5        31       198        83
WVCT   2025130    131400   -9.9400 -140.7300      13.0        18       216        96
WVCT   2025130    131400   -9.9400 -140.8000      14.3        27       216        95
WVCT   2025130    131400   -9.8900 -140.9300      15.8        37       215        99
WVCT   2025130    131400   -9.8900 -141.0200      16.7        37       211       100
WVCT   2025130    131400   -9.8700 -141.0400      17.1        36       211        99
WVCT   2025130    131400   -9.8700 -141.1800      15.7        23       189        99
WVCT   2025130    131400   -9.8900 -141.2600      15.3        18       186        99
WVCT   2025130    131400   -9.9400 -141.3100      16.3        19       184        96
WVCT   2025130    131400  -10.0400 -132.7800       5.2        33       193        95
WVCT   2025130    131400  -10.0600 -132.8200       5.2        37       194        96
WVCT   2025130    131400  -10.0200 -132.9700       7.3        62       200        83
WVCT   2025130    131400  -10.0000 -133.0600       5.5        71       210        80
WVCT   2025130    131400   -9.9800 -133.0800       5.1        74       215        80
WVCT   2025130    131400  -10.0300 -133.9300       4.2       103       231        64
WVCT   2025130    131400  -10.0500 -134.1200      14.6        56       225        95
WVCT   2025130    131400  -10.0300 -134.1400      14.2        58       225        94
WVCT   2025130    131400   -9.9900 -134.3000      12.8        78       215        89
WVCT   2025130    131400  -10.0300 -134.3200      12.2        84       215        92
WVCT   2025130    131400  -10.0500 -134.4300      14.9        69       214        90
WVCT   2025130    131400   -9.9700 -135.0400       5.4        45       224        60
WVCT   2025130    131400  -10.0100 -135.1900       6.0        38       215        73
WVCT   2025130    131400  -10.0100 -135.2800       7.4        46       208        80
WVCT   2025130    131400   -9.9700 -135.4300       7.2        34       198        78
WVCT   2025130    131400   -9.9700 -135.6500       9.8        58       188        60
WVCT   2025130    131400  -10.0300 -135.7200      11.1        55       185        98
WVCT   2025130    131400   -9.9900 -135.8900      16.4        60       168        87
WVCT   2025130    131400   -9.9900 -136.0400      15.7        50       163       100
WVCT   2025130    131400  -10.0100 -136.0900      15.9        47       160       100
WVCT   2025130    131400  -10.0300 -136.2000      16.5        44       152        98
WVCT   2025130    131400   -9.9700 -136.2900      19.0        40       146        97
WVCT   2025130    131400   -9.9700 -136.3300      18.9        38       145        92
WVCT   2025130    131400  -10.0400 -136.5000      17.9        38       134       100
WVCT   2025130    131400   -9.9700 -136.5900      18.0        42       132       100
WVCT   2025130    131400  -10.0100 -136.6400      18.4        41       127       100
WVCT   2025130    131400  -10.0100 -136.7000      20.4        45       122       100
WVCT   2025130    131400  -10.0200 -136.7900      19.8        44       120        98
WVCT   2025130    131400  -10.0200 -136.8800      17.2        43       119       100
WVCT   2025130    131400  -10.0400 -137.0300      15.1        35       116        75
WVCT   2025130    131400  -10.0200 -137.0700      13.9        41       116        66
WVCT   2025130    131400   -9.9900 -137.2300      15.4        84       111        87
WVCT   2025130    131400   -9.9700 -137.2500      15.3        82       111        81
WVCT   2025130    131400  -10.0200 -137.4100      15.2        28       109        80
WVCT   2025130    131400  -10.0000 -137.7800      20.4       307       109        71
WVCT   2025130    131400  -10.0000 -137.8000      23.3       303       109        93
WVCT   2025130    131400   -9.9700 -138.2400      14.7       328       135        99
WVCT   2025130    131400   -9.9700 -138.2600      14.6       326       135       100
WVCT   2025130    131400  -10.0200 -138.3900      11.6       331       137        72
WVCT   2025130    131400   -9.9800 -138.5100      11.5       359       159        97
WVCT   2025130    131400   -9.9600 -138.5300      12.1         0       163        83
WVCT   2025130    131400  -10.0000 -138.6200      14.1       356       173        94
WVCT   2025130    131400   -9.9600 -138.7500      16.4       352       177        95
WVCT   2025130    131400   -9.9800 -138.8600      13.1       353       202        98
WVCT   2025130    131400  -10.0000 -138.9500      11.4       351       204       100
WVCT   2025130    131400   -9.9800 -138.9900      10.8       350       204        99
WVCT   2025130    131400   -9.9600 -139.1500      11.1         2       159        91
WVCT   2025130    131400   -9.9600 -139.1900      10.8         5       160        92
WVCT   2025130    131400  -10.0400 -139.2800      11.2         7       163        95
WVCT   2025130    131400   -9.9800 -139.3600      10.2         9       164        99
WVCT   2025130    131400  -10.0200 -139.6100       8.5       351       176        91
WVCT   2025130    131400  -10.0000 -139.6500       7.8       353       174        89
WVCT   2025130    131400   -9.9800 -139.7600       7.1         3       174        99
WVCT   2025130    131400  -10.0000 -139.8500       5.7       344       178       100
WVCT   2025130    131400   -9.9600 -139.9600       5.7       340       183        92
WVCT   2025130    131400  -10.0400 -140.0700       5.2        10       194        95
WVCT   2025130    131400   -9.9600 -140.1400       5.0        27       198        82
WVCT   2025130    131400  -10.0000 -140.2000       5.3        29       198        90
WVCT   2025130    131400   -9.9600 -140.7800      13.7        25       216        95
WVCT   2025130    131400  -10.0400 -140.8700      14.4        32       217        96
WVCT   2025130    131400  -10.0400 -140.8900      14.2        34       215       100
WVCT   2025130    131400  -10.0400 -141.0000      15.4        32       200        98
WVCT   2025130    131400   -9.9600 -141.0700      19.0        29       200        93
WVCT   2025130    131400   -9.9600 -141.2400      17.2        16       186        98
WVCT   2025130    131400   -9.9800 -141.3300      13.8        23       184        92
WVCT   2025130    131400  -10.0400 -141.3900      11.2        51       183        98
WVCT   2025130    131400  -10.0800 -132.7700       5.3        33       195       100
WVCT   2025130    131400  -10.0800 -132.8000       5.3        34       194       100
WVCT   2025130    131400  -10.0800 -132.9700       5.8        63       196        95
WVCT   2025130    131400  -10.0700 -133.0100       5.3        67       200        94
WVCT   2025130    131400  -10.1400 -134.0200      11.0        50       225        93
WVCT   2025130    131400  -10.0700 -134.1200      15.0        55       225        96
WVCT   2025130    131400  -10.1300 -134.1900      14.8        61       225        97
WVCT   2025130    131400  -10.1100 -134.2700      11.8        72       221        94
WVCT   2025130    131400  -10.0700 -134.3400      11.7        79       215        93
WVCT   2025130    131400  -10.1400 -134.4300      15.8        52       214        87
WVCT   2025130    131400  -10.0700 -134.5600      11.6        56       213        90
WVCT   2025130    131400  -10.1000 -135.2300       6.8        18       220        62
WVCT   2025130    131400  -10.1200 -135.3500       9.1        24       205        77
WVCT   2025130    131400  -10.1400 -135.6300       9.7        34       189        90
WVCT   2025130    131400  -10.0800 -135.7200      10.7        54       186       100
WVCT   2025130    131400  -10.0600 -135.8300       4.7       135       175        60
WVCT   2025130    131400  -10.1000 -135.9400       8.6        74       168        69
WVCT   2025130    131400  -10.1000 -136.0000      11.3        57       166        78
WVCT   2025130    131400  -10.1400 -136.0500      15.4        49       162        86
WVCT   2025130    131400  -10.1400 -136.1800      17.8        45       153       100
WVCT   2025130    131400  -10.1200 -136.2900      19.7        48       143       100
WVCT   2025130    131400  -10.1200 -136.3700      18.8        47       138       100
WVCT   2025130    131400  -10.1200 -136.4800      18.4        42       133       100
WVCT   2025130    131400  -10.0800 -136.5700      17.7        39       129        99
WVCT   2025130    131400  -10.0600 -136.6100      17.6        38       127        98
WVCT   2025130    131400  -10.1200 -136.7000      15.7        41       120        87
WVCT   2025130    131400  -10.1200 -136.8100      17.5        42       117       100
WVCT   2025130    131400  -10.1000 -136.8800      17.5        40       116       100
WVCT   2025130    131400  -10.1300 -137.0300      15.6        35       116        88
WVCT   2025130    131400  -10.1200 -137.0600      16.1        37       116        81
WVCT   2025130    131400  -10.0800 -137.2300      16.7        64       114        98
WVCT   2025130    131400  -10.1300 -137.6100      15.7         6       109        87
WVCT   2025130    131400  -10.1000 -138.2400      11.9       338       137        81
WVCT   2025130    131400  -10.1300 -138.2700      12.4       337       138        87
WVCT   2025130    131400  -10.0600 -138.3700      11.8       333       140        69
WVCT   2025130    131400  -10.0800 -138.5100      12.2       351       159        94
WVCT   2025130    131400  -10.0800 -138.5300      13.6       353       163       100
WVCT   2025130    131400  -10.1100 -138.6200      19.3         0       170        75
WVCT   2025130    131400  -10.0600 -138.7700      21.0       355       180        95
WVCT   2025130    131400  -10.0900 -138.8800      13.8       351       204        99
WVCT   2025130    131400  -10.1300 -138.9000      13.9       351       206        99
WVCT   2025130    131400  -10.1300 -139.0100      12.3       358       205        99
WVCT   2025130    131400  -10.1100 -139.0800      12.0         2       202        99
WVCT   2025130    131400  -10.1300 -139.2100      12.5         0       163        88
WVCT   2025130    131400  -10.0600 -139.2800      11.4         7       163        96
WVCT   2025130    131400  -10.1100 -139.3500      13.0         9       168        96
WVCT   2025130    131400  -10.1100 -139.5000      11.7         5       178        98
WVCT   2025130    131400  -10.0600 -139.6100       8.6       354       177        92
WVCT   2025130    131400  -10.1300 -139.6800       7.7       358       179        96
WVCT   2025130    131400  -10.1100 -139.7800       8.1         7       180       100
WVCT   2025130    131400  -10.0700 -139.8100       7.3         0       180        96
WVCT   2025130    131400  -10.0900 -139.9200       5.2       325       185        99
WVCT   2025130    131400  -10.0600 -140.0500       4.7       358       192        68
WVCT   2025130    131400  -10.0600 -140.1100       5.5        14       195        96
WVCT   2025130    131400  -10.1300 -140.2000       6.6         5       196        90
WVCT   2025130    131400  -10.1300 -140.2900       6.8         9       196        97
WVCT   2025130    131400  -10.0700 -140.7600      12.5        17       224        79
WVCT   2025130    131400  -10.1100 -140.8700      12.6        40       217        98
WVCT   2025130    131400  -10.1300 -140.8900      12.5        39       216        98
WVCT   2025130    131400  -10.1100 -141.0000      12.4        38       199        88
WVCT   2025130    131400  -10.0900 -141.0900      13.6        42       200        95
WVCT   2025130    131400  -10.0900 -141.1800      12.9        46       202        95
WVCT   2025130    131400  -10.1300 -141.3300       8.3        60       189       100
WVCT   2025130    131400  -10.1300 -141.3500       8.7        61       188       100
WVCT   2025130    131400  -10.2400 -133.3000       6.3        56       213        73
WVCT   2025130    131400  -10.1600 -134.0200      11.3        49       225        97
WVCT   2025130    131400  -10.2400 -134.0400      12.6        47       227        95
WVCT   2025130    131400  -10.2000 -134.3400      13.1        54       218       100
WVCT   2025130    131400  -10.1600 -134.4300      15.9        49       214        82
WVCT   2025130    131400  -10.2400 -134.5200      17.1        51       210        78
WVCT   2025130    131400  -10.2000 -134.6000      15.7        50       210        73
WVCT   2025130    131400  -10.1800 -134.9500       6.2        24       199        71
WVCT   2025130    131400  -10.2300 -135.0200       7.8        23       216        98
WVCT   2025130    131400  -10.2300 -135.3500       9.3        27       207        68
WVCT   2025130    131400  -10.2100 -135.3700       8.7        31       207        68
WVCT   2025130    131400  -10.1800 -135.7400      10.7        45       187        99
WVCT   2025130    131400  -10.1600 -135.8900       6.0       109       175        68
WVCT   2025130    131400  -10.1900 -136.0900      16.7        46       159       100
WVCT   2025130    131400  -10.2100 -136.1100      16.6        46       160       100
WVCT   2025130    131400  -10.1700 -136.2700      19.3        49       144       100
WVCT   2025130    131400  -10.1500 -136.2900      19.7        49       143       100
WVCT   2025130    131400  -10.1900 -136.4400      18.8        46       135       100
WVCT   2025130    131400  -10.1900 -136.4700      18.4        44       133       100
WVCT   2025130    131400  -10.1900 -136.6400      15.8        40       125        97
WVCT   2025130    131400  -10.1700 -136.6800      15.8        42       124        97
WVCT   2025130    131400  -10.2100 -136.8100      17.1        40       123       100
WVCT   2025130    131400  -10.2100 -136.9000      16.7        36       124       100
WVCT   2025130    131400  -10.1500 -136.9700      15.7        35       117        98
WVCT   2025130    131400  -10.2100 -137.0800      17.3        32       116        94
WVCT   2025130    131400  -10.1700 -137.1700      17.4        33       116        89
WVCT   2025130    131400  -10.1700 -137.2100      18.0        36       116        90
WVCT   2025130    131400  -10.1700 -137.4500      15.8         3       109        97
WVCT   2025130    131400  -10.2100 -137.5200      14.7         1       108        64
WVCT   2025130    131400  -10.1700 -137.6100      16.9         5       111        81
WVCT   2025130    131400  -10.1700 -138.1100      17.3       310       137        85
WVCT   2025130    131400  -10.2100 -138.1800      12.6       344       134        75
WVCT   2025130    131400  -10.1500 -138.2700      12.5       339       139        94
WVCT   2025130    131400  -10.1900 -138.3700      13.3       338       148        96
WVCT   2025130    131400  -10.2100 -138.4200      13.5       336       152        93
WVCT   2025130    131400  -10.1500 -138.4900      13.5       345       159        96
WVCT   2025130    131400  -10.2200 -138.6600      17.2       360       173        90
WVCT   2025130    131400  -10.1900 -138.7300      16.8       356       179        72
WVCT   2025130    131400  -10.2200 -138.8400      12.8       354       203       100
WVCT   2025130    131400  -10.2100 -138.8600      13.1       354       206        99
WVCT   2025130    131400  -10.1900 -138.9700      12.8       357       209        98
WVCT   2025130    131400  -10.2100 -139.1200      12.7       359       164       100
WVCT   2025130    131400  -10.2100 -139.1700      13.0       359       163        99
WVCT   2025130    131400  -10.1500 -139.3000      13.1         4       166        92
WVCT   2025130    131400  -10.2200 -139.3200      13.4         1       170        94
WVCT   2025130    131400  -10.1500 -139.4100      14.0         8       173        93
WVCT   2025130    131400  -10.1700 -139.5700       8.7       353       181        97
WVCT   2025130    131400  -10.1500 -139.6700       7.6       356       180        96
WVCT   2025130    131400  -10.1500 -139.7400       8.3         4       182       100
WVCT   2025130    131400  -10.2000 -139.8300       7.9         6       186       100
WVCT   2025130    131400  -10.2000 -139.9000       6.3       352       189        97
WVCT   2025130    131400  -10.1900 -140.0300       5.0       334       194        97
WVCT   2025130    131400  -10.1500 -140.1200       5.7       360       195        82
WVCT   2025130    131400  -10.1500 -140.1600       6.3         2       195        89
WVCT   2025130    131400  -10.2200 -140.2300       6.3         9       195        71
WVCT   2025130    131400  -10.1500 -140.3200       6.0         8       197        99
WVCT   2025130    131400  -10.1900 -140.9300      11.1        32       201        95
WVCT   2025130    131400  -10.1500 -141.0200      10.3        35       199        94
WVCT   2025130    131400  -10.1700 -141.1100       8.7        56       200        99
WVCT   2025130    131400  -10.1900 -141.1300       7.9        65       200        99
WVCT   2025130    131400  -10.1500 -141.2400      10.5        66       201        98
WVCT   2025130    131400  -10.1500 -141.3500       8.7        62       189       100
WVCT   2025130    131400  -10.3300 -133.3300       5.6        47       208        61
WVCT   2025130    131400  -10.3300 -133.7200       4.0        56       217        72
WVCT   2025130    131400  -10.2900 -133.8900       6.3        30       232        60
WVCT   2025130    131400  -10.2500 -134.5400      16.1        53       210        80
WVCT   2025130    131400  -10.3300 -134.5600      12.9        51       209        93
WVCT   2025130    131400  -10.2900 -134.6900      15.2        52       208        88
WVCT   2025130    131400  -10.3100 -134.9400      10.0        25       200        95
WVCT   2025130    131400  -10.2500 -135.0000       8.0        26       201        97
WVCT   2025130    131400  -10.2700 -135.0600       7.6        19       225        80
WVCT   2025130    131400  -10.2900 -135.3100       8.0        31       208        68
WVCT   2025130    131400  -10.2500 -135.3700       8.9        37       207        63
WVCT   2025130    131400  -10.3200 -135.4200       9.6        72       209        69
WVCT   2025130    131400  -10.2500 -135.8300      12.7        52       188        79
WVCT   2025130    131400  -10.3200 -135.9400      16.6        40       185       100
WVCT   2025130    131400  -10.2900 -136.0100      16.4        43       178        98
WVCT   2025130    131400  -10.2700 -136.1200      16.3        44       166       100
WVCT   2025130    131400  -10.3000 -136.2000      16.4        41       158        99
WVCT   2025130    131400  -10.3000 -136.2500      18.0        41       151       100
WVCT   2025130    131400  -10.3200 -136.3400      19.7        42       146       100
WVCT   2025130    131400  -10.2700 -136.4600      19.7        43       137       100
WVCT   2025130    131400  -10.3000 -136.6000      17.1        41       130        98
WVCT   2025130    131400  -10.2800 -136.6400      16.5        38       127        98
WVCT   2025130    131400  -10.3200 -136.7900      17.7        41       128       100
WVCT   2025130    131400  -10.2600 -136.8600      17.8        40       126       100
WVCT   2025130    131400  -10.2500 -136.9300      16.8        32       125        98
WVCT   2025130    131400  -10.3200 -136.9900      16.8        27       129        97
WVCT   2025130    131400  -10.3200 -137.1500      16.8        20       115        99
WVCT   2025130    131400  -10.3000 -137.2100      16.9        24       114        99
WVCT   2025130    131400  -10.2600 -137.2600      17.0        22       115       100
WVCT   2025130    131400  -10.3000 -137.4300      15.3       358       108        99
WVCT   2025130    131400  -10.2600 -137.5000      14.5         5       108        63
WVCT   2025130    131400  -10.2600 -137.5400      14.6        15       109        81
WVCT   2025130    131400  -10.3200 -137.8000       4.9       356       141        60
WVCT   2025130    131400  -10.3200 -137.8300       4.8         5       142        83
WVCT   2025130    131400  -10.3200 -137.9600       8.9         4       140        71
WVCT   2025130    131400  -10.2600 -138.0000      11.1       341       138        96
WVCT   2025130    131400  -10.3200 -138.1100      14.3       329       137        99
WVCT   2025130    131400  -10.2800 -138.2200      15.4       345       134        98
WVCT   2025130    131400  -10.3200 -138.3300      14.7       350       143        98
WVCT   2025130    131400  -10.3000 -138.4000      13.4       341       151        84
WVCT   2025130    131400  -10.2400 -138.4600      13.7       340       154        91
WVCT   2025130    131400  -10.3000 -138.5800      16.2         0       169        89
WVCT   2025130    131400  -10.3200 -138.7100      15.2       354       178        94
WVCT   2025130    131400  -10.2400 -138.8000      13.4       354       200        99
WVCT   2025130    131400  -10.2400 -138.8400      12.7       353       204       100
WVCT   2025130    131400  -10.2800 -138.9500      12.9       351       211        99
WVCT   2025130    131400  -10.2400 -139.0100      13.1       355       209        99
WVCT   2025130    131400  -10.2800 -139.1300      12.9       354       164       100
WVCT   2025130    131400  -10.2600 -139.2100      13.1       356       165        99
WVCT   2025130    131400  -10.2400 -139.3200      13.2       360       170        95
WVCT   2025130    131400  -10.2400 -139.3700      12.8         1       173        89
WVCT   2025130    131400  -10.2800 -139.4600      11.4       359       179        92
WVCT   2025130    131400  -10.3200 -139.5700      10.9       356       184       100
WVCT   2025130    131400  -10.2400 -139.6800       9.5       354       186        98
WVCT   2025130    131400  -10.3000 -139.8100       9.2         4       214        99
WVCT   2025130    131400  -10.3200 -139.8300       9.7         4       225       100
WVCT   2025130    131400  -10.2800 -140.0000       8.4       336       197        98
WVCT   2025130    131400  -10.3200 -140.0500       7.1       333       196        86
WVCT   2025130    131400  -10.2600 -140.1600       5.5       355       194        96
WVCT   2025130    131400  -10.2600 -140.2500       6.4         9       195        97
WVCT   2025130    131400  -10.2400 -140.2900       6.8        11       195       100
WVCT   2025130    131400  -10.3200 -140.5400      11.2        16       195        99
WVCT   2025130    131400  -10.3200 -140.5600      11.3        15       194        99
WVCT   2025130    131400  -10.2400 -140.9100      10.9        23       206        94
WVCT   2025130    131400  -10.2800 -141.0000       7.7        21       202        97
WVCT   2025130    131400  -10.2800 -141.0200       7.6        19       201       100
WVCT   2025130    131400  -10.2400 -141.1100       5.4        54       202        95
WVCT   2025130    131400  -10.2600 -141.2600       5.9        58       203        82
WVCT   2025130    131400  -10.2400 -141.3500       7.6        61       190        99
WVCT   2025130    131400  -10.4200 -133.7200       4.1        63       216        81
WVCT   2025130    131400  -10.3900 -134.0400       9.8        54       230        82
WVCT   2025130    131400  -10.4000 -134.4200      15.1        48       209        96
WVCT   2025130    131400  -10.4200 -134.5400      14.9        47       209       100
WVCT   2025130    131400  -10.3800 -134.5700      13.1        46       208       100
WVCT   2025130    131400  -10.4200 -134.6800      16.2        45       208        98
WVCT   2025130    131400  -10.3600 -134.9400      11.2        20       202        99
WVCT   2025130    131400  -10.3600 -135.0000      10.2        16       239        91
WVCT   2025130    131400  -10.3800 -135.0700       8.5         9       244        65
WVCT   2025130    131400  -10.4200 -135.3100       5.9        59       225        84
WVCT   2025130    131400  -10.4200 -135.3300       7.3        66       224        85
WVCT   2025130    131400  -10.3800 -135.5000      11.7        96       209        96
WVCT   2025130    131400  -10.4200 -135.7500      24.0        54       192        83
WVCT   2025130    131400  -10.4200 -135.8500      20.4        49       191        92
WVCT   2025130    131400  -10.4200 -135.9400      18.7        45       188        96
WVCT   2025130    131400  -10.3600 -135.9800      16.7        40       184        98
WVCT   2025130    131400  -10.3400 -136.1400      14.3        45       169        88
WVCT   2025130    131400  -10.3400 -136.2200      15.2        42       158        93
WVCT   2025130    131400  -10.4100 -136.3200      16.8        38       152       100
WVCT   2025130    131400  -10.3800 -136.3400      19.5        38       148       100
WVCT   2025130    131400  -10.4100 -136.5100      20.3        43       139       100
WVCT   2025130    131400  -10.3400 -136.5300      18.5        42       135        99
WVCT   2025130    131400  -10.3600 -136.6900      17.0        41       132        99
WVCT   2025130    131400  -10.3600 -136.7800      18.2        39       131        99
WVCT   2025130    131400  -10.3600 -136.8000      18.3        39       131       100
WVCT   2025130    131400  -10.3600 -136.9300      18.0        31       133        99
WVCT   2025130    131400  -10.3800 -137.0100      17.3        27       131        99
WVCT   2025130    131400  -10.3800 -137.1200      17.1        20       116       100
WVCT   2025130    131400  -10.3800 -137.1900      17.4        18       114       100
WVCT   2025130    131400  -10.3800 -137.3400      14.3         8       113        99
WVCT   2025130    131400  -10.3900 -137.3500      14.1         1       113        85
WVCT   2025130    131400  -10.3600 -137.4800      13.5         8       108        67
WVCT   2025130    131400  -10.3400 -137.5800      14.3        23       111        89
WVCT   2025130    131400  -10.3700 -137.6800      12.7        26       124        66
WVCT   2025130    131400  -10.3400 -137.7800       6.8         7       138        63
WVCT   2025130    131400  -10.3700 -137.8900       7.0        16       138        75
WVCT   2025130    131400  -10.3700 -137.9100       7.3        17       138        75
WVCT   2025130    131400  -10.4100 -138.0500       9.8       353       139        96
WVCT   2025130    131400  -10.4100 -138.1100      12.7       338       138       100
WVCT   2025130    131400  -10.3900 -138.2500      15.7       351       133        96
WVCT   2025130    131400  -10.3700 -138.2700      15.9       353       136        99
WVCT   2025130    131400  -10.3500 -138.4200      13.9       347       152        90
WVCT   2025130    131400  -10.3500 -138.4700      13.7       348       154        73
WVCT   2025130    131400  -10.3900 -138.6200      15.7       358       174        88
WVCT   2025130    131400  -10.3400 -138.7100      15.0       354       178        90
WVCT   2025130    131400  -10.3900 -138.8000      13.5       346       185        95
WVCT   2025130    131400  -10.3700 -138.8600      12.4       344       199        99
WVCT   2025130    131400  -10.4100 -138.9500      12.6       344       196        99
WVCT   2025130    131400  -10.3900 -139.0400      12.2       346       162        98
WVCT   2025130    131400  -10.4100 -139.1200      12.6       348       161        99
WVCT   2025130    131400  -10.3300 -139.2100      12.8       354       165        99
WVCT   2025130    131400  -10.4100 -139.3500      12.3       356       171        97
WVCT   2025130    131400  -10.3700 -139.4100      11.2       357       176       100
WVCT   2025130    131400  -10.3300 -139.5400      10.7       359       182        99
WVCT   2025130    131400  -10.3500 -139.5900      10.9       357       186        97
WVCT   2025130    131400  -10.4100 -139.6600       9.8       351       225        99
WVCT   2025130    131400  -10.3700 -139.8100       9.9         5       228       100
WVCT   2025130    131400  -10.3300 -139.8300      10.0         5       226       100
WVCT   2025130    131400  -10.4100 -139.9900       9.5       343       229        82
WVCT   2025130    131400  -10.3500 -140.0900       6.4       342       197        91
WVCT   2025130    131400  -10.3300 -140.1000       5.9       342       195        95
WVCT   2025130    131400  -10.3500 -140.2000       6.7         1       196        99
WVCT   2025130    131400  -10.3500 -140.3100       8.7         9       197        98
WVCT   2025130    131400  -10.3700 -140.4000       9.1        13       197        98
WVCT   2025130    131400  -10.3700 -140.4700      10.2        16       194       100
WVCT   2025130    131400  -10.3300 -141.0400       7.6         8       210        75
WVCT   2025130    131400  -10.3300 -141.1300       5.2        21       217        65
WVCT   2025130    131400  -10.3300 -141.2000       6.0        21       222        66
WVCT   2025130    131400  -10.3300 -141.2800       5.2        32       218        94
WVCT   2025130    131400  -10.4100 -141.4100       4.2        64       215        88
WVCT   2025130    131400  -10.5200 -133.2000       4.1        55       205       100
WVCT   2025130    131400  -10.4800 -133.3300       5.9        39       204        99
WVCT   2025130    131400  -10.5000 -133.4000       4.2        31       206        91
WVCT   2025130    131400  -10.4400 -134.0200       8.2        51       227        60
WVCT   2025130    131400  -10.5000 -134.0300      10.2        53       224        79
WVCT   2025130    131400  -10.5200 -134.2600      14.7        55       214       100
WVCT   2025130    131400  -10.4400 -134.4200      14.6        52       209       100
WVCT   2025130    131400  -10.4600 -134.5700      15.1        44       208       100
WVCT   2025130    131400  -10.4600 -134.5900      14.8        44       208       100
WVCT   2025130    131400  -10.5100 -134.6800      12.6        46       208        99
WVCT   2025130    131400  -10.5100 -134.8300       9.4        33       202        74
WVCT   2025130    131400  -10.4800 -134.9400      11.6        28       214        77
WVCT   2025130    131400  -10.4600 -134.9600      11.7        22       236        88
WVCT   2025130    131400  -10.5100 -135.0500      10.6        16       252        99
WVCT   2025130    131400  -10.5100 -135.1400       8.7         3       254        70
WVCT   2025130    131400  -10.4700 -135.3300       6.6        65       227        91
WVCT   2025130    131400  -10.4500 -135.4400      12.2        87       215        98
WVCT   2025130    131400  -10.4900 -135.6400       6.1        27       194        87
WVCT   2025130    131400  -10.5100 -135.7000       5.5        23       192        87
WVCT   2025130    131400  -10.4500 -135.8600      20.1        47       191        83
WVCT   2025130    131400  -10.4300 -135.9200      19.4        46       189        98
WVCT   2025130    131400  -10.4700 -135.9900      16.7        32       187        99
WVCT   2025130    131400  -10.4500 -136.1000      12.3        44       177        92
WVCT   2025130    131400  -10.5100 -136.1600      11.5        48       173        81
WVCT   2025130    131400  -10.5100 -136.2900      13.0        47       163        96
WVCT   2025130    131400  -10.4300 -136.3400      16.0        38       151        99
WVCT   2025130    131400  -10.5100 -136.5100      20.4        48       148        99
WVCT   2025130    131400  -10.4700 -136.5400      19.0        47       144        96
WVCT   2025130    131400  -10.5100 -136.6700      17.8        35       143        98
WVCT   2025130    131400  -10.4700 -136.7600      18.3        36       138       100
WVCT   2025130    131400  -10.4700 -136.8000      18.5        33       135       100
WVCT   2025130    131400  -10.4300 -136.9700      17.5        30       132        93
WVCT   2025130    131400  -10.4500 -136.9900      17.5        29       131        95
WVCT   2025130    131400  -10.4700 -137.1300      17.3        16       117       100
WVCT   2025130    131400  -10.4700 -137.2400      16.2        11       115        98
WVCT   2025130    131400  -10.4900 -137.3300      15.2         1       116        96
WVCT   2025130    131400  -10.4900 -137.3700      15.0       360       115        94
WVCT   2025130    131400  -10.5000 -137.5000      16.7       354       114        99
WVCT   2025130    131400  -10.4500 -137.5700      14.7         9       116        98
WVCT   2025130    131400  -10.5000 -137.6800      14.2        27       125        70
WVCT   2025130    131400  -10.4700 -137.7200      11.9        27       130        73
WVCT   2025130    131400  -10.4300 -137.8300       6.9       356       137        91
WVCT   2025130    131400  -10.4500 -137.9600       8.4         5       138        67
WVCT   2025130    131400  -10.4500 -138.0900      11.6       345       139        89
WVCT   2025130    131400  -10.4800 -138.2300      13.1       351       135        96
WVCT   2025130    131400  -10.4300 -138.3400      14.7       357       145        97
WVCT   2025130    131400  -10.4800 -138.4400      16.1         6       157        80
WVCT   2025130    131400  -10.4800 -138.5300      15.0       359       169        98
WVCT   2025130    131400  -10.4300 -138.5600      15.7       357       171        99
WVCT   2025130    131400  -10.4800 -138.6700      15.8       355       179        96
WVCT   2025130    131400  -10.4700 -138.8000      14.9       347       182        98
WVCT   2025130    131400  -10.5000 -138.8600      15.4       346       185        99
WVCT   2025130    131400  -10.4300 -138.9300      12.9       344       191       100
WVCT   2025130    131400  -10.4700 -139.0600      12.9       347       160        99
WVCT   2025130    131400  -10.4800 -139.1000      12.7       347       162       100
WVCT   2025130    131400  -10.5000 -139.2600      10.3       334       168        77
WVCT   2025130    131400  -10.4800 -139.3000      11.2       341       169        75
WVCT   2025130    131400  -10.4300 -139.4300      11.0       354       178        97
WVCT   2025130    131400  -10.4800 -139.4600      10.9       350       184        96
WVCT   2025130    131400  -10.4600 -139.5700       9.6       349       226       100
WVCT   2025130    131400  -10.4300 -139.6600       9.7       349       226       100
WVCT   2025130    131400  -10.4300 -139.7900      10.0         3       229        98
WVCT   2025130    131400  -10.4800 -139.8300      11.6         4       230       100
WVCT   2025130    131400  -10.5000 -139.9200      12.3         2       229        99
WVCT   2025130    131400  -10.4300 -140.0100       9.2       342       228        86
WVCT   2025130    131400  -10.4500 -140.1800       9.3       351       225        99
WVCT   2025130    131400  -10.4500 -140.2000       9.5       353       224        99
WVCT   2025130    131400  -10.4800 -140.2900      10.0         8       226        95
WVCT   2025130    131400  -10.5000 -140.4000       9.3         9       217        80
WVCT   2025130    131400  -10.5000 -140.5400      11.4        11       192        66
WVCT   2025130    131400  -10.5000 -140.5600      11.8        12       192        76
WVCT   2025130    131400  -10.5000 -140.7100      12.3        15       195       100
WVCT   2025130    131400  -10.4300 -141.0800       6.7        20       210        72
WVCT   2025130    131400  -10.4300 -141.1900       7.2        18       223        87
WVCT   2025130    131400  -10.4500 -141.2600       7.1        19       224       100
WVCT   2025130    131400  -10.4300 -141.4100       4.0        65       217        99
WVCT   2025130    131400  -10.6200 -132.7300       4.6        34       208        65
WVCT   2025130    131400  -10.5900 -134.0100       8.4        52       222        65
WVCT   2025130    131400  -10.5300 -134.0500      12.1        54       224        91
WVCT   2025130    131400  -10.5700 -134.4800      16.0        53       208       100
WVCT   2025130    131400  -10.5900 -134.5500      15.4        54       208        99
WVCT   2025130    131400  -10.5900 -134.6100      14.9        55       208        99
WVCT   2025130    131400  -10.5900 -134.7500       7.0         9       205        61
WVCT   2025130    131400  -10.5700 -134.8100       9.4        30       203        72
WVCT   2025130    131400  -10.5300 -134.8700      10.1        36       203        66
WVCT   2025130    131400  -10.5900 -134.9700      11.8        42       218        66
WVCT   2025130    131400  -10.6000 -135.0700      13.6        28       234        99
WVCT   2025130    131400  -10.5500 -135.1600      10.6        11       254        71
WVCT   2025130    131400  -10.5300 -135.6400       6.6        23       193        75
WVCT   2025130    131400  -10.5300 -135.7100       5.8        18       192        76
WVCT   2025130    131400  -10.5700 -135.8200      13.6        35       192        82
WVCT   2025130    131400  -10.5300 -135.8800      18.3        45       190        70
WVCT   2025130    131400  -10.5600 -136.0500      20.9         6       186        99
WVCT   2025130    131400  -10.5300 -136.1800      11.9        44       172        69
WVCT   2025130    131400  -10.5500 -136.2700      13.5        44       166        92
WVCT   2025130    131400  -10.6000 -136.3800      17.3        41       160       100
WVCT   2025130    131400  -10.5400 -136.4300      17.8        43       152       100
WVCT   2025130    131400  -10.5300 -136.5200      20.7        47       148       100
WVCT   2025130    131400  -10.5600 -136.6500      18.2        27       146        96
WVCT   2025130    131400  -10.5300 -136.7600      18.8        27       137        97
WVCT   2025130    131400  -10.5200 -136.8000      19.2        27       134        98
WVCT   2025130    131400  -10.5200 -136.9100      18.5        33       130        92
WVCT   2025130    131400  -10.5200 -137.0600      18.0        21       129        95
WVCT   2025130    131400  -10.6000 -137.1500      18.6        10       125        97
WVCT   2025130    131400  -10.5600 -137.1700      17.7        10       121       100
WVCT   2025130    131400  -10.6000 -137.2800      17.7         2       121       100
WVCT   2025130    131400  -10.6000 -137.3500      17.5       360       120       100
WVCT   2025130    131400  -10.5400 -137.5200      16.2       354       115        99
WVCT   2025130    131400  -10.5400 -137.5500      16.1       353       115        98
WVCT   2025130    131400  -10.6000 -137.6300      13.4       356       115        69
WVCT   2025130    131400  -10.5800 -137.8300      10.6       350       127        92
WVCT   2025130    131400  -10.5200 -137.9800      10.4       355       130        75
WVCT   2025130    131400  -10.5200 -138.0700      10.5         5       138        79
WVCT   2025130    131400  -10.5400 -138.1400      11.1         5       137        96
WVCT   2025130    131400  -10.5800 -138.2200      11.7         6       141        95
WVCT   2025130    131400  -10.5200 -138.3100      13.2         3       152        99
WVCT   2025130    131400  -10.5200 -138.4400      15.4         7       158        85
WVCT   2025130    131400  -10.5200 -138.4500      15.1         6       161        86
WVCT   2025130    131400  -10.5200 -138.6200      15.5       358       180        99
WVCT   2025130    131400  -10.5800 -138.6900      16.5       356       180        99
WVCT   2025130    131400  -10.5800 -138.8000      16.2       351       179        99
WVCT   2025130    131400  -10.5800 -138.8800      15.9       349       185       100
WVCT   2025130    131400  -10.5400 -138.9100      15.3       348       180       100
WVCT   2025130    131400  -10.5600 -139.0200      14.1       348       199       100
WVCT   2025130    131400  -10.5400 -139.1000      12.8       349       198        99
WVCT   2025130    131400  -10.5800 -139.2600      10.2       320       176        95
WVCT   2025130    131400  -10.5900 -139.2800      10.5       320       195        96
WVCT   2025130    131400  -10.5800 -139.3700      12.0       339       196        95
WVCT   2025130    131400  -10.5800 -139.4800      10.8       342       215        99
WVCT   2025130    131400  -10.5200 -139.6300      10.1       342       229        99
WVCT   2025130    131400  -10.5900 -139.7200      10.4       339       231       100
WVCT   2025130    131400  -10.5800 -139.7400      10.5       341       230        99
WVCT   2025130    131400  -10.5900 -139.8800      12.4         3       230       100
WVCT   2025130    131400  -10.5900 -139.9600      12.4         1       229       100
WVCT   2025130    131400  -10.5400 -140.0900      10.3       349       228        97
WVCT   2025130    131400  -10.5800 -140.1600       9.6       349       228        92
WVCT   2025130    131400  -10.5600 -140.2300       9.1       354       230        94
WVCT   2025130    131400  -10.5800 -140.3100       9.3        16       227        93
WVCT   2025130    131400  -10.5800 -140.4000       8.1         3       203        99
WVCT   2025130    131400  -10.5600 -140.5300       9.9         7       193        76
WVCT   2025130    131400  -10.5400 -140.5600      13.3        21       192        96
WVCT   2025130    131400  -10.5800 -141.0600      10.0         5       227        91
WVCT   2025130    131400  -10.5400 -141.2200       6.8        14       223        93
WVCT   2025130    131400  -10.5200 -141.2400       6.9        18       224        98
WVCT   2025130    131400  -10.5200 -141.3500       5.3        48       226        95
WVCT   2025130    131400  -10.6300 -132.7500       4.0        36       207        81
WVCT   2025130    131400  -10.6900 -133.0600       4.2        22       206        99
WVCT   2025130    131400  -10.6600 -134.0900      11.0        56       223        93
WVCT   2025130    131400  -10.7000 -134.1400       9.7        58       224        93
WVCT   2025130    131400  -10.6600 -134.2300      11.3        55       221       100
WVCT   2025130    131400  -10.6800 -134.3100      12.0        54       215        99
WVCT   2025130    131400  -10.7000 -134.4400      14.9        55       213        99
WVCT   2025130    131400  -10.6800 -134.5500      14.4        53       208       100
WVCT   2025130    131400  -10.7000 -134.5800      14.1        53       208        99
WVCT   2025130    131400  -10.6400 -134.9200      12.4        50       214        61
WVCT   2025130    131400  -10.6600 -134.9900      13.0        38       224        87
WVCT   2025130    131400  -10.6400 -135.0700      14.3        29       228        99
WVCT   2025130    131400  -10.6600 -135.1600      13.0        26       230        92
WVCT   2025130    131400  -10.6200 -135.5800      10.0        18       201        81
WVCT   2025130    131400  -10.6400 -135.6000      10.5        12       201        64
WVCT   2025130    131400  -10.7000 -135.6900      12.9         0       195        69
WVCT   2025130    131400  -10.6400 -135.8200      11.9        18       193        84
WVCT   2025130    131400  -10.6600 -135.9500      24.4       353       190        98
WVCT   2025130    131400  -10.6800 -136.0300      25.0       354       188       100
WVCT   2025130    131400  -10.6800 -136.1400      22.7         5       183        99
WVCT   2025130    131400  -10.6800 -136.2300      19.6        30       169        92
WVCT   2025130    131400  -10.6200 -136.2800      16.7        39       167        97
WVCT   2025130    131400  -10.6400 -136.4100      19.2        38       161        99
WVCT   2025130    131400  -10.6400 -136.4300      19.3        38       160       100
WVCT   2025130    131400  -10.6700 -136.5200      20.6        42       157       100
WVCT   2025130    131400  -10.6400 -136.8700      18.9        37       127       100
WVCT   2025130    131400  -10.6700 -136.9600      20.9        15       123        78
WVCT   2025130    131400  -10.6500 -137.0200      21.1        15       125        81
WVCT   2025130    131400  -10.6400 -137.1500      19.2        11       129        97
WVCT   2025130    131400  -10.6400 -137.1900      19.4         6       124        97
WVCT   2025130    131400  -10.6200 -137.2600      18.7         2       121       100
WVCT   2025130    131400  -10.6700 -137.3500      19.6       359       121        98
WVCT   2025130    131400  -10.6200 -137.4600      17.7       355       117        99
WVCT   2025130    131400  -10.6700 -137.5300      15.0       359       116        91
WVCT   2025130    131400  -10.6200 -137.6800      12.1         3       116        93
WVCT   2025130    131400  -10.6200 -137.9400      11.4       353       126        84
WVCT   2025130    131400  -10.6300 -138.0300      10.4        33       131        97
WVCT   2025130    131400  -10.6700 -138.1200      11.0        33       137        98
WVCT   2025130    131400  -10.6100 -138.2000      11.8        15       141        93
WVCT   2025130    131400  -10.6900 -138.2900      12.6        19       153        99
WVCT   2025130    131400  -10.6300 -138.3600      12.9        16       156        97
WVCT   2025130    131400  -10.6500 -138.4700      12.3        16       169        87
WVCT   2025130    131400  -10.6100 -138.6200      15.4         2       180        96
WVCT   2025130    131400  -10.6900 -138.7100      14.1       360       179        97
WVCT   2025130    131400  -10.6300 -138.8000      15.9       354       179        98
WVCT   2025130    131400  -10.6900 -138.8400      14.9       350       189        99
WVCT   2025130    131400  -10.6700 -138.9100      13.9       347       202       100
WVCT   2025130    131400  -10.6300 -139.0600      13.7       350       201       100
WVCT   2025130    131400  -10.6500 -139.1700      12.0       335       202        97
WVCT   2025130    131400  -10.6700 -139.3900      10.8       338       195       100
WVCT   2025130    131400  -10.6900 -139.4600      10.2       336       196       100
WVCT   2025130    131400  -10.6700 -139.5700       9.7       334       218        93
WVCT   2025130    131400  -10.6700 -139.7200       7.7       345       230        88
WVCT   2025130    131400  -10.6700 -139.7600       7.9       348       230        92
WVCT   2025130    131400  -10.6300 -139.8700      11.6         2       230       100
WVCT   2025130    131400  -10.6900 -139.9400      10.9         3       228       100
WVCT   2025130    131400  -10.6300 -140.0100      11.1         2       228        99
WVCT   2025130    131400  -10.6500 -140.1200       8.8       354       222       100
WVCT   2025130    131400  -10.6700 -140.2500       6.5       356       201       100
WVCT   2025130    131400  -10.6500 -140.2900       7.7        11       204       100
WVCT   2025130    131400  -10.6100 -140.4000       7.9         2       200        98
WVCT   2025130    131400  -10.6900 -140.5300       8.9       343       193        95
WVCT   2025130    131400  -10.6700 -140.6000       8.4       349       194        99
WVCT   2025130    131400  -10.6700 -140.6500       8.4       352       197       100
WVCT   2025130    131400  -10.6700 -141.0900       7.0       359       219        70
WVCT   2025130    131400  -10.6300 -141.2000       5.6        25       219        95
WVCT   2025130    131400  -10.6900 -141.3500       8.9        13       220       100
WVCT   2025130    131400  -10.6900 -141.3900      10.1        19       219        90
WVCT   2025130    131400  -10.7800 -132.8600       4.6        33       205        96
WVCT   2025130    131400  -10.7600 -132.8900       4.2        21       203        98
WVCT   2025130    131400  -10.8000 -133.2300       4.0        20       194        67
WVCT   2025130    131400  -10.8000 -133.2500       4.3        23       195        69
WVCT   2025130    131400  -10.8000 -134.1000       4.5        41       215        73
WVCT   2025130    131400  -10.7900 -134.1600       4.5        49       216        86
WVCT   2025130    131400  -10.7600 -134.2100       6.3        55       220        95
WVCT   2025130    131400  -10.7400 -134.3600      13.1        54       213        99
WVCT   2025130    131400  -10.7400 -134.4200      14.4        54       211       100
WVCT   2025130    131400  -10.7200 -134.5700      14.5        51       208       100
WVCT   2025130    131400  -10.7400 -134.6000      15.1        48       208       100
WVCT   2025130    131400  -10.7200 -134.7500       5.2        21       219        61
WVCT   2025130    131400  -10.7900 -134.9500      12.4        27       224        99
WVCT   2025130    131400  -10.7900 -135.0100      15.6        23       226        95
WVCT   2025130    131400  -10.7700 -135.1200      13.5        26       214        97
WVCT   2025130    131400  -10.7900 -135.1700      11.0        19       196        91
WVCT   2025130    131400  -10.7100 -135.9500      22.4       352       190        99
WVCT   2025130    131400  -10.7100 -136.0800      21.3       359       187       100
WVCT   2025130    131400  -10.7700 -136.1700      22.1         7       182       100
WVCT   2025130    131400  -10.7500 -136.2600      22.1        31       168        96
WVCT   2025130    131400  -10.7700 -136.3000      24.0        26       168        98
WVCT   2025130    131400  -10.7300 -136.3900      21.7        35       164        99
WVCT   2025130    131400  -10.7700 -136.5400      22.2        29       157       100
WVCT   2025130    131400  -10.7900 -136.5600      22.6        27       156       100
WVCT   2025130    131400  -10.7900 -136.6500      26.6         8       150        98
WVCT   2025130    131400  -10.7700 -136.7800      31.8       355       141        71
WVCT   2025130    131400  -10.7700 -136.9100      15.5        10       122        81
WVCT   2025130    131400  -10.7800 -137.0000      18.3        18       121        94
WVCT   2025130    131400  -10.7700 -137.0700      21.0        15       124        96
WVCT   2025130    131400  -10.7800 -137.1500      21.8        10       125        98
WVCT   2025130    131400  -10.7300 -137.2400      21.5         3       122        98
WVCT   2025130    131400  -10.7100 -137.3100      20.8         1       120        98
WVCT   2025130    131400  -10.7300 -137.4100      20.8         0       120        97
WVCT   2025130    131400  -10.7700 -137.4800      22.8         1       119        96
WVCT   2025130    131400  -10.7100 -137.6300      11.6         2       119        88
WVCT   2025130    131400  -10.7100 -137.6600      11.3         2       119        92
WVCT   2025130    131400  -10.7100 -138.1000      10.8        31       135        98
WVCT   2025130    131400  -10.7600 -138.1900      15.0        27       143       100
WVCT   2025130    131400  -10.7100 -138.2900      12.5        21       153        98
WVCT   2025130    131400  -10.7100 -138.3400      11.4        21       157        85
WVCT   2025130    131400  -10.7100 -138.4700      10.2        18       169        79
WVCT   2025130    131400  -10.7600 -138.4900       9.7        23       173        87
WVCT   2025130    131400  -10.7400 -138.6200      10.8        15       181        87
WVCT   2025130    131400  -10.7100 -138.7100      13.4       359       181        97
WVCT   2025130    131400  -10.7600 -138.8400      13.3       346       202        98
WVCT   2025130    131400  -10.7800 -138.8600      13.1       344       207        99
WVCT   2025130    131400  -10.7800 -138.9500      12.3       343       209        99
WVCT   2025130    131400  -10.7400 -139.0600      14.9       348       208        98
WVCT   2025130    131400  -10.7800 -139.1500      16.1       344       221        98
WVCT   2025130    131400  -10.7600 -139.2800      11.6       317       206        97
WVCT   2025130    131400  -10.7600 -139.4600       7.3       332       197        96
WVCT   2025130    131400  -10.7600 -139.5000       8.1       329       216        93
WVCT   2025130    131400  -10.7100 -139.6600       7.3       332       226        81
WVCT   2025130    131400  -10.7100 -139.7400       6.8       341       230        86
WVCT   2025130    131400  -10.7800 -139.8100       6.0       338       230        91
WVCT   2025130    131400  -10.7100 -139.9400      10.5         2       230       100
WVCT   2025130    131400  -10.7600 -140.0300      10.3       360       230       100
WVCT   2025130    131400  -10.7600 -140.0500      10.3         1       230       100
WVCT   2025130    131400  -10.7600 -140.1400       9.3       360       222        99
WVCT   2025130    131400  -10.7100 -140.2300       6.9       351       200        99
WVCT   2025130    131400  -10.7800 -140.4000      10.9         1       202       100
WVCT   2025130    131400  -10.7800 -140.4300      11.3         2       202       100
WVCT   2025130    131400  -10.7200 -140.5400       9.6       344       194        98
WVCT   2025130    131400  -10.7100 -140.6400       8.8       345       195       100
WVCT   2025130    131400  -10.7600 -140.7500      11.3         3       206        85
WVCT   2025130    131400  -10.7100 -141.3300       7.7         5       219        98
WVCT   2025130    131400  -10.7100 -141.3700       9.7        14       220        97
WVCT   2025130    131400  -10.8900 -132.8300       5.2        26       204        92
WVCT   2025130    131400  -10.8200 -132.8700       4.4        33       205        91
WVCT   2025130    131400  -10.8200 -133.2800       4.5        29       195        67
WVCT   2025130    131400  -10.8900 -133.3900       7.5        32       185        73
WVCT   2025130    131400  -10.8900 -133.6500       8.4        20       198        71
WVCT   2025130    131400  -10.8300 -133.7800       8.5        25       201        79
WVCT   2025130    131400  -10.8300 -133.8000       8.3        24       201        88
WVCT   2025130    131400  -10.8900 -133.9300       5.1         7       203        72
WVCT   2025130    131400  -10.8100 -134.1400       4.5        43       213        92
WVCT   2025130    131400  -10.8300 -134.1700       5.1        47       207        88
WVCT   2025130    131400  -10.8500 -134.2800       9.3        53       208        99
WVCT   2025130    131400  -10.8300 -134.4300      15.3        50       206        99
WVCT   2025130    131400  -10.8300 -134.4500      16.2        51       203        99
WVCT   2025130    131400  -10.8500 -134.6200      13.9        50       202       100
WVCT   2025130    131400  -10.8300 -134.6400      13.8        46       203        97
WVCT   2025130    131400  -10.8500 -134.8600       5.7        63       218        72
WVCT   2025130    131400  -10.8100 -134.9700      13.7        27       224       100
WVCT   2025130    131400  -10.8100 -135.1200      13.0        22       211        95
WVCT   2025130    131400  -10.8100 -135.1500      11.5        20       196        92
WVCT   2025130    131400  -10.8100 -135.2700       9.1       343       188        64
WVCT   2025130    131400  -10.8800 -135.3600      11.7         2       202        94
WVCT   2025130    131400  -10.8300 -135.4300      12.2       348       204        96
WVCT   2025130    131400  -10.8400 -135.8700      22.0         1       192        93
WVCT   2025130    131400  -10.8100 -136.0400      20.6         1       190        96
WVCT   2025130    131400  -10.8200 -136.1000      20.0         2       189       100
WVCT   2025130    131400  -10.8400 -136.2200      21.7        11       175        99
WVCT   2025130    131400  -10.8400 -136.2400      22.0        12       173        98
WVCT   2025130    131400  -10.8600 -136.3900      22.9        29       162        99
WVCT   2025130    131400  -10.8200 -136.5000      22.9        31       158       100
WVCT   2025130    131400  -10.8800 -136.5400      22.7        27       155        98
WVCT   2025130    131400  -10.8200 -136.6100      23.9        17       152        99
WVCT   2025130    131400  -10.8400 -136.7400      25.7         4       139        87
WVCT   2025130    131400  -10.8800 -136.8700      14.7        21       128        87
WVCT   2025130    131400  -10.8400 -136.9400      15.9        15       124        81
WVCT   2025130    131400  -10.8600 -137.0000      16.6        16       124        84
WVCT   2025130    131400  -10.8000 -137.1500      21.8        10       123        98
WVCT   2025130    131400  -10.8800 -137.2000      22.7        16       122        73
WVCT   2025130    131400  -10.8600 -137.2900      16.4        30       122        74
WVCT   2025130    131400  -10.8200 -137.3900      25.5         2       116        90
WVCT   2025130    131400  -10.8800 -137.5000      14.1         0       122        74
WVCT   2025130    131400  -10.8800 -137.5700      12.5       358       123        66
WVCT   2025130    131400  -10.8000 -137.7000      11.8         4       124        88
WVCT   2025130    131400  -10.8200 -137.7200      11.8       356       126        72
WVCT   2025130    131400  -10.8200 -138.1600      13.6        23       144        88
WVCT   2025130    131400  -10.8200 -138.1800      13.8        24       144        92
WVCT   2025130    131400  -10.8600 -138.3400      13.3        27       158        96
WVCT   2025130    131400  -10.8200 -138.3600      12.8        24       160        90
WVCT   2025130    131400  -10.8400 -138.4500      11.8        25       168        90
WVCT   2025130    131400  -10.8200 -138.6200      11.1        20       178        94
WVCT   2025130    131400  -10.8200 -138.6400      11.5        16       178        94
WVCT   2025130    131400  -10.8400 -138.8000      12.3       348       194        99
WVCT   2025130    131400  -10.8400 -138.8200      12.6       346       196        98
WVCT   2025130    131400  -10.8000 -138.9300      12.5       342       208        99
WVCT   2025130    131400  -10.8700 -139.0400      14.0       346       199        95
WVCT   2025130    131400  -10.8700 -139.0900      14.7       347       207        97
WVCT   2025130    131400  -10.8000 -139.2600      12.7       319       207        98
WVCT   2025130    131400  -10.8400 -139.3000      11.9       312       206        90
WVCT   2025130    131400  -10.8600 -139.3900       9.2       316       198        94
WVCT   2025130    131400  -10.8200 -139.5200       7.8       327       214        96
WVCT   2025130    131400  -10.8200 -139.5900       8.3       326       220        91
WVCT   2025130    131400  -10.8000 -139.6500       7.4       324       222        74
WVCT   2025130    131400  -10.8200 -139.7700       4.8       329       229        85
WVCT   2025130    131400  -10.8500 -139.8500       5.9       345       230        95
WVCT   2025130    131400  -10.8000 -139.9600       9.2       356       230       100
WVCT   2025130    131400  -10.8000 -140.0900       9.6         1       230        99
WVCT   2025130    131400  -10.8000 -140.1200       9.4         3       228        99
WVCT   2025130    131400  -10.8200 -140.2100       9.6         2       204        97
WVCT   2025130    131400  -10.8700 -140.3600      11.1       355       204        99
WVCT   2025130    131400  -10.8500 -140.3800      11.5       359       204       100
WVCT   2025130    131400  -10.8200 -140.4900      11.5         1       207       100
WVCT   2025130    131400  -10.8000 -140.5600      10.7       350       206        99
WVCT   2025130    131400  -10.8700 -140.6700      11.6       354       206        97
WVCT   2025130    131400  -10.8000 -141.2600       4.7        25       216        77
WVCT   2025130    131400  -10.8000 -141.3500       7.1         5       218        77
WVCT   2025130    131400  -10.9500 -132.7400       4.5         1       206        64
WVCT   2025130    131400  -10.9100 -132.7800       4.3         9       206        66
WVCT   2025130    131400  -10.9900 -133.2400      12.9        31       191        99
WVCT   2025130    131400  -10.9700 -133.4100      10.6        30       185        93
WVCT   2025130    131400  -10.9500 -133.4300       9.6        31       187        92
WVCT   2025130    131400  -10.9800 -133.5800      12.0        35       194        79
WVCT   2025130    131400  -10.9700 -133.6100      10.5        30       195        73
WVCT   2025130    131400  -10.9500 -133.7800       6.6        15       198        96
WVCT   2025130    131400  -10.9500 -133.8000       6.5        16       199        94
WVCT   2025130    131400  -10.9800 -133.9100       4.5        23       200        68
WVCT   2025130    131400  -10.9400 -134.0600       4.1        28       202        75
WVCT   2025130    131400  -10.9300 -134.1000       4.6        35       203        96
WVCT   2025130    131400  -10.9400 -134.2300      10.3        50       211        97
WVCT   2025130    131400  -10.9600 -134.2600      11.7        49       210        96
WVCT   2025130    131400  -10.9800 -134.5200      15.3        52       201        99
WVCT   2025130    131400  -10.9600 -134.6100      13.9        51       202       100
WVCT   2025130    131400  -10.9800 -134.6300      13.6        53       202        99
WVCT   2025130    131400  -10.9000 -134.9300       9.1        36       216        81
WVCT   2025130    131400  -10.9400 -135.0000      11.7        22       217        93
WVCT   2025130    131400  -10.9000 -135.0400      14.2        12       216        99
WVCT   2025130    131400  -10.9600 -135.1300      12.3        11       196        92
WVCT   2025130    131400  -10.9600 -135.2300      11.8        12       193        97
WVCT   2025130    131400  -10.9400 -135.3700      11.9         8       202        99
WVCT   2025130    131400  -10.9400 -135.4100      12.0         9       203       100
WVCT   2025130    131400  -10.9200 -135.7600      15.3         9       203        97
WVCT   2025130    131400  -10.9700 -135.8400      15.3         6       200        97
WVCT   2025130    131400  -10.9700 -135.9100      15.2         1       191        89
WVCT   2025130    131400  -10.9700 -136.0400      21.3       354       189        97
WVCT   2025130    131400  -10.9000 -136.0800      21.9       358       190        75
WVCT   2025130    131400  -10.9400 -136.2200      22.9         2       179        99
WVCT   2025130    131400  -10.9400 -136.2800      22.6         6       175        99
WVCT   2025130    131400  -10.9700 -136.3700      21.6         4       164        96
WVCT   2025130    131400  -10.9400 -136.4800      22.4        32       158        96
WVCT   2025130    131400  -10.9000 -136.5600      22.3        26       155        91
WVCT   2025130    131400  -10.9000 -136.6300      22.5        14       148        97
WVCT   2025130    131400  -10.9300 -136.7800      20.2        12       132        97
WVCT   2025130    131400  -10.9200 -136.8000      19.5        16       131        95
WVCT   2025130    131400  -10.9300 -136.9600      14.1        16       129        73
WVCT   2025130    131400  -10.9000 -136.9800      14.5        17       127        72
WVCT   2025130    131400  -10.9500 -137.1100      14.0         8       130        89
WVCT   2025130    131400  -10.9000 -137.2200      14.1        28       123        61
WVCT   2025130    131400  -10.9500 -137.3300      20.5        10       126        90
WVCT   2025130    131400  -10.9500 -137.4800      15.4       359       124        72
WVCT   2025130    131400  -10.9300 -137.5500      13.5       358       123        64
WVCT   2025130    131400  -10.9500 -137.8100      13.1        13       137        99
WVCT   2025130    131400  -10.9300 -137.9400      11.9       354       143       100
WVCT   2025130    131400  -10.9300 -137.9900      12.7       346       145       100
WVCT   2025130    131400  -10.9500 -138.1600      15.2        27       148        81
WVCT   2025130    131400  -10.9500 -138.1900      15.6        31       149        87
WVCT   2025130    131400  -10.9100 -138.2700      15.0        31       152        99
WVCT   2025130    131400  -10.8900 -138.4300      13.4        24       164       100
WVCT   2025130    131400  -10.8900 -138.4700      13.5        25       168       100
WVCT   2025130    131400  -10.9100 -138.6200      14.1        16       173        97
WVCT   2025130    131400  -10.9300 -138.6500      14.2        11       173        98
WVCT   2025130    131400  -10.9300 -138.8000      12.9       355       175        96
WVCT   2025130    131400  -10.9500 -138.8900      13.1       349       185        97
WVCT   2025130    131400  -10.9500 -138.9100      13.2       347       187        97
WVCT   2025130    131400  -10.8900 -139.0800      14.1       346       203        98
WVCT   2025130    131400  -10.9100 -139.1100      14.0       346       206        98
WVCT   2025130    131400  -10.9500 -139.2400      13.3       326       214        98
WVCT   2025130    131400  -10.8900 -139.3500      11.4       313       207        96
WVCT   2025130    131400  -10.9300 -139.3700      11.5       314       205        96
WVCT   2025130    131400  -10.9100 -139.4600       9.1       322       193        92
WVCT   2025130    131400  -10.9700 -139.5500      12.5       327       194        64
WVCT   2025130    131400  -10.9100 -139.6400      10.3       327       221        92
WVCT   2025130    131400  -10.9500 -139.7700       7.7       338       226        98
WVCT   2025130    131400  -10.9100 -139.8800       7.7       345       232        98
WVCT   2025130    131400  -10.9100 -139.9800       8.8       350       232        97
WVCT   2025130    131400  -10.8900 -140.0100       9.0       353       232        95
WVCT   2025130    131400  -10.9700 -140.1800       9.7         1       208        98
WVCT   2025130    131400  -10.9300 -140.2700       9.7       353       204        96
WVCT   2025130    131400  -10.8900 -140.3600      10.5       350       204        99
WVCT   2025130    131400  -10.9300 -140.3800       9.8       344       206       100
WVCT   2025130    131400  -10.9700 -140.5100      10.3       359       224       100
WVCT   2025130    131400  -10.9300 -140.6200      12.3       359       214        97
WVCT   2025130    131400  -10.9500 -140.6900      11.6       356       208        96
WVCT   2025130    131400  -10.8900 -140.8000      11.8         9       209        98
WVCT   2025130    131400  -10.9700 -140.8600       9.3       353       213        97
WVCT   2025130    131400  -11.0800 -132.7200       8.6        16       201        98
WVCT   2025130    131400  -11.0400 -132.8100       4.0       340       191        94
WVCT   2025130    131400  -11.0600 -133.2000       9.5        32       195        97
WVCT   2025130    131400  -11.0200 -133.2600      12.4        31       187        95
WVCT   2025130    131400  -11.0600 -133.3500      10.8        31       183        98
WVCT   2025130    131400  -11.0400 -133.5000      13.8        37       189        93
WVCT   2025130    131400  -11.0400 -133.5900      11.1        33       192        78
WVCT   2025130    131400  -11.0200 -133.6100      10.7        31       193        74
WVCT   2025130    131400  -11.0800 -133.7800       4.9       344       195        70
WVCT   2025130    131400  -11.0200 -133.8700       4.9        15       197        64
WVCT   2025130    131400  -11.0000 -133.8900       4.9        20       199        66
WVCT   2025130    131400  -11.0000 -134.0600       5.9        37       202        83
WVCT   2025130    131400  -11.0200 -134.0800       7.1        40       203        89
WVCT   2025130    131400  -11.0000 -134.1700       9.4        46       219        96
WVCT   2025130    131400  -11.0200 -134.2600      12.1        46       219       100
WVCT   2025130    131400  -11.0700 -134.3700      12.9        49       208       100
WVCT   2025130    131400  -11.0700 -134.4600      13.8        51       201       100
WVCT   2025130    131400  -11.0200 -134.6100      13.4        54       202       100
WVCT   2025130    131400  -11.0000 -134.6300      13.7        54       202       100
WVCT   2025130    131400  -11.0200 -134.8000      14.9        38       208        60
WVCT   2025130    131400  -11.0000 -135.0200      13.4        22       214        91
WVCT   2025130    131400  -11.0000 -135.1100      13.3        14       197        91
WVCT   2025130    131400  -11.0100 -135.2100      12.5        12       195        99
WVCT   2025130    131400  -11.0000 -135.2200      12.3        11       194        99
WVCT   2025130    131400  -11.0300 -135.3900      11.9        10       211        94
WVCT   2025130    131400  -11.0100 -135.4800       8.4         0       206        66
WVCT   2025130    131400  -11.0700 -135.6900       9.7         8       207        66
WVCT   2025130    131400  -10.9900 -135.8500      14.6         6       199        91
WVCT   2025130    131400  -10.9900 -135.9300      14.8         1       189        97
WVCT   2025130    131400  -11.0500 -136.0400      17.3       357       189        83
WVCT   2025130    131400  -11.0700 -136.0500      17.1         1       189        73
WVCT   2025130    131400  -10.9900 -136.2200      23.2         0       179        99
WVCT   2025130    131400  -11.0100 -136.2800      23.1         1       176        98
WVCT   2025130    131400  -11.0300 -136.4100      22.8         5       163        76
WVCT   2025130    131400  -11.0100 -136.4600      23.8         7       160        61
WVCT   2025130    131400  -10.9900 -136.5700      21.6        16       157        93
WVCT   2025130    131400  -11.0100 -136.6100      20.0         6       153        98
WVCT   2025130    131400  -11.0600 -136.7400      16.2        15       149        99
WVCT   2025130    131400  -10.9900 -136.8300      17.2        32       134        97
WVCT   2025130    131400  -10.9900 -136.9400      14.0        11       134        66
WVCT   2025130    131400  -10.9900 -136.9800      14.5        12       134        65
WVCT   2025130    131400  -11.0500 -137.1400      13.7         2       135        99
WVCT   2025130    131400  -11.0300 -137.1600      13.6         3       133        98
WVCT   2025130    131400  -11.0100 -137.3300      20.1         5       127        81
WVCT   2025130    131400  -11.0100 -137.3800      23.3         0       126        79
WVCT   2025130    131400  -11.0400 -137.4900      16.8         5       134        90
WVCT   2025130    131400  -11.0400 -137.5500      16.3         9       136        74
WVCT   2025130    131400  -11.0200 -137.8600      13.7        10       139        99
WVCT   2025130    131400  -10.9900 -137.9200      13.1       359       141       100
WVCT   2025130    131400  -10.9900 -138.0100      14.9       350       144        96
WVCT   2025130    131400  -11.0100 -138.1000      14.8       357       145        70
WVCT   2025130    131400  -10.9900 -138.2100      16.0        28       149        79
WVCT   2025130    131400  -11.0200 -138.3000      19.7        32       149        87
WVCT   2025130    131400  -11.0200 -138.3600      19.2        34       152        99
WVCT   2025130    131400  -10.9900 -138.5200      15.1        29       164        96
WVCT   2025130    131400  -10.9900 -138.6200      15.5        13       170        92
WVCT   2025130    131400  -11.0000 -138.6900      15.3         6       171        91
WVCT   2025130    131400  -10.9900 -138.8000      13.8       358       173        94
WVCT   2025130    131400  -11.0000 -138.8900      13.3       350       181        95
WVCT   2025130    131400  -11.0000 -138.9500      13.2       345       187        96
WVCT   2025130    131400  -11.0000 -139.0000      13.4       343       196        97
WVCT   2025130    131400  -11.0600 -139.1300      13.4       339       209        99
WVCT   2025130    131400  -11.0400 -139.1800      13.1       333       213       100
WVCT   2025130    131400  -11.0200 -139.2800      13.4       324       214        97
WVCT   2025130    131400  -11.0600 -139.4400      13.3       319       199        84
WVCT   2025130    131400  -11.0600 -139.4600      13.3       319       199        84
WVCT   2025130    131400  -11.0600 -139.5700      13.9       324       201        97
WVCT   2025130    131400  -11.0600 -139.7000      11.5       326       216        99
WVCT   2025130    131400  -11.0600 -139.7900      12.7       332       224        92
WVCT   2025130    131400  -11.0200 -139.9000      12.8       338       231        98
WVCT   2025130    131400  -11.0600 -139.9600      13.6       343       230        96
WVCT   2025130    131400  -11.0400 -140.0800      11.4       352       201        95
WVCT   2025130    131400  -10.9800 -140.1600       9.8       359       208        96
WVCT   2025130    131400  -11.0600 -140.2700       9.4       353       222        99
WVCT   2025130    131400  -11.0000 -140.3400       9.2       345       208        99
WVCT   2025130    131400  -11.0200 -140.4500       8.1       344       225        99
WVCT   2025130    131400  -11.0400 -140.4700       8.1       341       229       100
WVCT   2025130    131400  -11.0200 -140.5600      10.0       354       227       100
WVCT   2025130    131400  -10.9800 -140.6700      11.9       356       209        96
WVCT   2025130    131400  -11.0000 -140.8200      10.3       359       209        99
WVCT   2025130    131400  -10.9800 -140.8400       9.7       356       211        98
WVCT   2025130    131400  -11.1600 -132.7100       8.5        16       197       100
WVCT   2025130    131400  -11.1600 -132.7900       6.3       360       192        95
WVCT   2025130    131400  -11.1200 -132.8800       5.7         3       189        95
WVCT   2025130    131400  -11.1000 -133.2200       8.3        30       193        65
WVCT   2025130    131400  -11.1200 -133.2900       8.3        25       185        85
WVCT   2025130    131400  -11.1300 -133.4000       9.5        31       180        82
WVCT   2025130    131400  -11.1200 -133.4400      10.0        34       184        93
WVCT   2025130    131400  -11.1100 -133.5200      10.0        38       188       100
WVCT   2025130    131400  -11.1100 -133.6600       5.9       347       193        90
WVCT   2025130    131400  -11.1300 -133.7800       5.4       338       196        75
WVCT   2025130    131400  -11.1700 -133.8500       6.1        15       200        74
WVCT   2025130    131400  -11.1500 -133.9200       5.2        24       199        85
WVCT   2025130    131400  -11.1500 -134.0500       8.9        40       206        84
WVCT   2025130    131400  -11.1300 -134.0700       9.0        40       210        88
WVCT   2025130    131400  -11.1700 -134.2400       9.4        41       222        83
WVCT   2025130    131400  -11.1300 -134.3000       9.8        46       217        87
WVCT   2025130    131400  -11.1100 -134.4100      12.4        49       205       100
WVCT   2025130    131400  -11.0900 -134.4400      13.6        50       202       100
WVCT   2025130    131400  -11.1500 -134.6100      12.1        57       200        99
WVCT   2025130    131400  -11.1300 -134.6500      12.6        59       201       100
WVCT   2025130    131400  -11.1300 -135.0700      15.2        30       206        96
WVCT   2025130    131400  -11.1100 -135.1500      15.5        12       196        99
WVCT   2025130    131400  -11.1100 -135.2200      13.8         6       200        95
WVCT   2025130    131400  -11.1100 -135.2800      12.8         4       215        96
WVCT   2025130    131400  -11.1600 -135.4400       9.5       352       211        99
WVCT   2025130    131400  -11.1200 -135.4800       8.7       352       203        98
WVCT   2025130    131400  -11.1600 -135.6100      12.2       357       203        99
WVCT   2025130    131400  -11.1400 -135.6500      12.7       359       205        95
WVCT   2025130    131400  -11.1400 -135.8100      15.4       359       203        94
WVCT   2025130    131400  -11.1600 -135.9100      17.1       359       192        98
WVCT   2025130    131400  -11.1400 -135.9200      16.8         0       190        92
WVCT   2025130    131400  -11.1200 -136.0900      17.7         0       189        70
WVCT   2025130    131400  -11.1200 -136.1500      21.2       359       186        83
WVCT   2025130    131400  -11.1200 -136.2400      24.0       358       181        90
WVCT   2025130    131400  -11.0800 -136.3700      21.7         6       168        98
WVCT   2025130    131400  -11.1400 -136.4600      20.9        15       165        97
WVCT   2025130    131400  -11.1400 -136.4800      20.4        16       164        98
WVCT   2025130    131400  -11.0800 -136.6300      18.5         4       156        99
WVCT   2025130    131400  -11.1000 -136.6800      17.7         8       155       100
WVCT   2025130    131400  -11.1400 -136.8300      15.4        41       155        80
WVCT   2025130    131400  -11.1400 -136.8700      14.3        40       156        64
WVCT   2025130    131400  -11.1200 -136.9400      13.3        36       153        61
WVCT   2025130    131400  -11.1600 -137.1000      11.9       359       144        99
WVCT   2025130    131400  -11.1000 -137.1800      13.3       359       136        99
WVCT   2025130    131400  -11.0800 -137.2900      20.8       355       131        74
WVCT   2025130    131400  -11.0800 -137.3100      20.9       349       131        68
WVCT   2025130    131400  -11.1400 -137.4500      14.3       355       137        80
WVCT   2025130    131400  -11.0800 -137.5500      14.8         6       139        73
WVCT   2025130    131400  -11.1600 -137.6200      17.0       358       143        96
WVCT   2025130    131400  -11.1000 -137.8100      14.6         1       133        94
WVCT   2025130    131400  -11.0800 -137.9200      16.8       360       138       100
WVCT   2025130    131400  -11.1600 -138.0300      29.9       355       138        74
WVCT   2025130    131400  -11.1500 -138.2100      16.4       356       140        77
WVCT   2025130    131400  -11.1200 -138.2700      19.6        13       143        98
WVCT   2025130    131400  -11.1000 -138.3200      20.3        14       145        99
WVCT   2025130    131400  -11.0800 -138.4100      19.7        52       152        68
WVCT   2025130    131400  -11.1400 -138.5600      15.0        51       160        91
WVCT   2025130    131400  -11.0800 -138.6100      15.1        32       164        74
WVCT   2025130    131400  -11.1200 -138.6900      15.5        25       167        65
WVCT   2025130    131400  -11.1000 -138.8500      12.8         2       174        84
WVCT   2025130    131400  -11.1200 -138.9500      12.3       351       176        91
WVCT   2025130    131400  -11.1000 -138.9600      12.4       348       178        90
WVCT   2025130    131400  -11.0800 -139.1300      13.4       339       208        97
WVCT   2025130    131400  -11.0800 -139.1500      13.5       338       209        97
WVCT   2025130    131400  -11.1200 -139.2900      13.7       324       208        96
WVCT   2025130    131400  -11.1300 -139.3700      14.4       320       198        98
WVCT   2025130    131400  -11.0800 -139.5000      13.5       320       198        87
WVCT   2025130    131400  -11.0800 -139.5700      13.6       324       202        97
WVCT   2025130    131400  -11.0800 -139.6600      11.0       323       214        96
WVCT   2025130    131400  -11.0800 -139.7000      12.0       327       215       100
WVCT   2025130    131400  -11.1200 -139.8300      13.4       335       231        88
WVCT   2025130    131400  -11.1200 -139.9000      14.1       342       236        91
WVCT   2025130    131400  -11.1200 -140.0100      14.0       349       223        98
WVCT   2025130    131400  -11.1500 -140.1000      12.0       353       224        96
WVCT   2025130    131400  -11.1200 -140.1900      11.2       358       225        99
WVCT   2025130    131400  -11.1000 -140.2500      10.0       357       227        95
WVCT   2025130    131400  -11.0800 -140.3800       8.1       337       228        99
WVCT   2025130    131400  -11.0800 -140.5100       8.4       337       227        99
WVCT   2025130    131400  -11.1500 -140.5800       9.8       332       222        93
WVCT   2025130    131400  -11.1300 -140.6200      10.3       343       221        92
WVCT   2025130    131400  -11.1300 -140.7100      11.8       355       219        97
WVCT   2025130    131400  -11.1500 -140.8600       9.8       356       225        98
WVCT   2025130    131400  -11.2500 -132.6700      10.7        25       202        99
WVCT   2025130    131400  -11.2100 -132.8200       7.9        15       198        97
WVCT   2025130    131400  -11.2700 -132.9300      10.2        34       200        94
WVCT   2025130    131400  -11.2500 -132.9500       9.3        33       200        96
WVCT   2025130    131400  -11.2700 -133.2100       7.9        16       196        77
WVCT   2025130    131400  -11.2500 -133.2900       7.2        20       181        90
WVCT   2025130    131400  -11.2100 -133.3300       6.7        23       177        99
WVCT   2025130    131400  -11.2500 -133.4600       4.5        19       179        99
WVCT   2025130    131400  -11.2300 -133.5900       6.5        12       190        98
WVCT   2025130    131400  -11.2600 -133.6800       6.9         6       194        93
WVCT   2025130    131400  -11.2600 -133.8300       5.1        13       206        88
WVCT   2025130    131400  -11.1900 -133.8900       6.1        24       203        83
WVCT   2025130    131400  -11.2200 -134.0000       7.3        31       201        88
WVCT   2025130    131400  -11.1900 -134.0700       9.5        38       219        87
WVCT   2025130    131400  -11.2400 -134.2400       8.8        33       219        77
WVCT   2025130    131400  -11.1900 -134.2900       7.0        41       217        73
WVCT   2025130    131400  -11.1900 -134.4100       7.6        48       209        64
WVCT   2025130    131400  -11.2600 -134.4400       9.2        50       203        93
WVCT   2025130    131400  -11.2200 -134.5300      12.9        44       198        98
WVCT   2025130    131400  -11.2000 -134.6600      14.0        39       205       100
WVCT   2025130    131400  -11.1800 -135.1500      16.8        12       200        96
WVCT   2025130    131400  -11.2200 -135.2400      15.8        10       200        93
WVCT   2025130    131400  -11.2400 -135.2600      15.9        11       200        94
WVCT   2025130    131400  -11.2400 -135.4000      11.5         1       195        97
WVCT   2025130    131400  -11.2200 -135.5000       7.5       346       201        99
WVCT   2025130    131400  -11.2600 -135.5300       7.1       351       201        96
WVCT   2025130    131400  -11.2200 -135.6300      11.5       359       204        99
WVCT   2025130    131400  -11.1800 -135.7600      14.8       357       208        97
WVCT   2025130    131400  -11.1800 -135.8900      17.3       358       199       100
WVCT   2025130    131400  -11.1800 -135.9600      16.3         1       190        82
WVCT   2025130    131400  -11.2300 -136.0500      14.9         1       190        76
WVCT   2025130    131400  -11.1800 -136.1100      16.6         1       190        77
WVCT   2025130    131400  -11.2300 -136.1800      14.9         2       189        76
WVCT   2025130    131400  -11.2500 -136.2700      13.6         2       186        93
WVCT   2025130    131400  -11.2000 -136.4400      18.8        17       168       100
WVCT   2025130    131400  -11.2100 -136.4600      18.1        20       169        99
WVCT   2025130    131400  -11.2500 -136.6100      20.6         7       164        96
WVCT   2025130    131400  -11.2300 -136.7200      18.2        27       160        95
WVCT   2025130    131400  -11.2100 -136.7400      16.9        35       158        96
WVCT   2025130    131400  -11.1800 -136.8500      14.0        44       158        65
WVCT   2025130    131400  -11.2500 -136.9700      10.9        38       159        86
WVCT   2025130    131400  -11.2500 -137.0800      12.1       353       159        65
WVCT   2025130    131400  -11.2500 -137.1000      12.3       346       159        82
WVCT   2025130    131400  -11.1900 -137.4500      13.7       348       139        77
WVCT   2025130    131400  -11.2300 -137.5500      18.0       357       147        94
WVCT   2025130    131400  -11.2500 -137.6000      18.5       357       152        96
WVCT   2025130    131400  -11.2500 -137.7300      12.8       337       154        71
WVCT   2025130    131400  -11.2500 -137.7500      12.7       337       154        70
WVCT   2025130    131400  -11.2500 -137.9000      11.6       339       154        70
WVCT   2025130    131400  -11.2500 -138.0100      14.5       310       154        83
WVCT   2025130    131400  -11.2300 -138.0200      15.1       304       149        80
WVCT   2025130    131400  -11.2300 -138.1900      10.8       350       142        67
WVCT   2025130    131400  -11.1700 -138.2500      14.2         5       142        86
WVCT   2025130    131400  -11.1900 -138.3200      15.4        19       144        85
WVCT   2025130    131400  -11.2300 -138.4300      17.1        47       156        98
WVCT   2025130    131400  -11.2300 -138.4800      17.3        46       159        91
WVCT   2025130    131400  -11.2500 -138.6100      14.4        51       165        98
WVCT   2025130    131400  -11.1900 -138.7200      13.9        33       169        64
WVCT   2025130    131400  -11.2500 -138.8000      15.8        31       175        82
WVCT   2025130    131400  -11.1900 -138.8700      12.6        16       176        78
WVCT   2025130    131400  -11.2300 -138.9400      14.0        11       176        91
WVCT   2025130    131400  -11.2500 -139.0400      14.5       357       176        98
WVCT   2025130    131400  -11.2300 -139.2000      14.7       335       201        95
WVCT   2025130    131400  -11.2500 -139.2600      14.6       333       200        92
WVCT   2025130    131400  -11.2100 -139.3900      14.9       322       197        99
WVCT   2025130    131400  -11.2300 -139.4000      14.8       321       190        99
WVCT   2025130    131400  -11.1700 -139.5000      13.1       320       198        84
WVCT   2025130    131400  -11.2500 -139.6600      14.4       330       208        99
WVCT   2025130    131400  -11.2500 -139.6800      14.7       331       209        99
WVCT   2025130    131400  -11.2100 -139.7900      14.7       335       228        99
WVCT   2025130    131400  -11.2500 -139.9200      13.3       339       240        92
WVCT   2025130    131400  -11.2100 -139.9700      14.1       344       233        98
WVCT   2025130    131400  -11.1700 -140.0800      12.4       353       228        98
WVCT   2025130    131400  -11.1700 -140.1800      10.8       356       233        95
WVCT   2025130    131400  -11.1700 -140.2500       8.9       354       233        87
WVCT   2025130    131400  -11.1700 -140.3200       8.2       346       233        98
WVCT   2025130    131400  -11.2100 -140.4700       9.1       328       223        98
WVCT   2025130    131400  -11.2100 -140.5800       9.4       325       220        92
WVCT   2025130    131400  -11.2100 -140.6000       9.1       327       220        90
WVCT   2025130    131400  -11.2100 -140.7100       8.9       338       222        90
WVCT   2025130    131400  -11.2300 -140.8200       8.4       343       226       100
WVCT   2025130    131400  -11.1700 -140.8700       8.6       351       228        97
WVCT   2025130    131400  -11.3600 -132.7400       6.0        13       207        99
WVCT   2025130    131400  -11.3400 -132.7600       6.2        14       207        99
WVCT   2025130    131400  -11.2900 -132.9100      10.6        33       204        94
WVCT   2025130    131400  -11.2900 -132.9500      10.5        33       198        97
WVCT   2025130    131400  -11.3400 -133.1200       9.7        16       203        67
WVCT   2025130    131400  -11.3600 -133.1700       9.3        19       213        70
WVCT   2025130    131400  -11.3600 -133.2300       8.7        20       208        74
WVCT   2025130    131400  -11.3600 -133.3200       5.9        15       180        81
WVCT   2025130    131400  -11.3000 -133.5100       6.5        12       181       100
WVCT   2025130    131400  -11.3400 -133.6600       8.7        18       191        83
WVCT   2025130    131400  -11.3600 -133.7100       6.6        15       196        96
WVCT   2025130    131400  -11.2800 -133.8300       4.9         9       207        92
WVCT   2025130    131400  -11.3400 -133.9600       7.4        11       194        92
WVCT   2025130    131400  -11.3600 -133.9700       7.7         6       194        98
WVCT   2025130    131400  -11.3500 -134.1200       9.8        24       221        96
WVCT   2025130    131400  -11.3000 -134.2400       9.2        28       219        81
WVCT   2025130    131400  -11.3500 -134.3100       8.0        30       218        99
WVCT   2025130    131400  -11.3000 -134.4000       8.2        49       214        92
WVCT   2025130    131400  -11.2800 -134.4400       9.0        49       203        94
WVCT   2025130    131400  -11.3300 -134.6100      12.7        31       214        98
WVCT   2025130    131400  -11.3500 -134.6600      14.0        25       219        98
WVCT   2025130    131400  -11.3500 -134.7200      13.1        31       221        98
WVCT   2025130    131400  -11.3500 -134.8100       7.7        67       215        63
WVCT   2025130    131400  -11.2900 -135.2000      16.3        12       201        89
WVCT   2025130    131400  -11.2700 -135.2600      16.2        12       200        95
WVCT   2025130    131400  -11.3500 -135.3800      12.5         8       192       100
WVCT   2025130    131400  -11.3300 -135.5000       6.1       356       189        95
WVCT   2025130    131400  -11.3100 -135.6100       9.1         5       204        94
WVCT   2025130    131400  -11.3300 -135.6400      11.6         7       224        97
WVCT   2025130    131400  -11.3300 -135.7700      14.5         6       219        93
WVCT   2025130    131400  -11.2700 -135.8300      15.7       358       207       100
WVCT   2025130    131400  -11.2900 -135.9400      14.6       358       190       100
WVCT   2025130    131400  -11.3500 -136.0700      13.8         4       189        86
WVCT   2025130    131400  -11.2900 -136.0900      13.7         1       190        77
WVCT   2025130    131400  -11.3500 -136.2500      13.4         1       189        98
WVCT   2025130    131400  -11.3500 -136.3100      13.1         3       188        94
WVCT   2025130    131400  -11.2900 -136.3600      14.5         7       184        99
WVCT   2025130    131400  -11.2900 -136.5300      20.5         5       173       100
WVCT   2025130    131400  -11.3100 -136.6200      19.7        12       166        99
WVCT   2025130    131400  -11.3300 -136.6400      19.8        18       166        95
WVCT   2025130    131400  -11.3400 -136.7300      17.2        40       166        95
WVCT   2025130    131400  -11.2700 -136.9900      11.7        41       159        69
WVCT   2025130    131400  -11.2900 -137.1400      12.9       347       162        93
WVCT   2025130    131400  -11.2900 -137.5500      20.8       355       152        86
WVCT   2025130    131400  -11.3100 -137.5600      20.7       354       152        90
WVCT   2025130    131400  -11.3000 -137.6700      14.7       357       154        85
WVCT   2025130    131400  -11.3200 -137.8200      12.3       357       157        89
WVCT   2025130    131400  -11.3200 -137.8400      12.9       358       158        95
WVCT   2025130    131400  -11.3400 -137.9500      12.6       332       160        78
WVCT   2025130    131400  -11.3000 -138.0600      18.3       300       155        66
WVCT   2025130    131400  -11.2700 -138.5000      16.7        49       160        83
WVCT   2025130    131400  -11.3200 -138.5800      14.7        55       163        62
WVCT   2025130    131400  -11.3400 -138.6700      20.5        54       167        80
WVCT   2025130    131400  -11.2700 -138.8200      16.5        27       175        75
WVCT   2025130    131400  -11.3000 -138.9300      16.0        17       176        97
WVCT   2025130    131400  -11.2700 -139.0000      15.2         6       176        98
WVCT   2025130    131400  -11.2700 -139.1100      14.2       346       176        97
WVCT   2025130    131400  -11.2800 -139.1300      14.2       343       175        95
WVCT   2025130    131400  -11.2800 -139.2900      14.6       332       197        97
WVCT   2025130    131400  -11.3200 -139.3100      14.6       331       196        99
WVCT   2025130    131400  -11.2600 -139.4400      14.7       320       189        99
WVCT   2025130    131400  -11.3200 -139.5700      14.8       324       195       100
WVCT   2025130    131400  -11.3200 -139.5900      14.7       324       196       100
WVCT   2025130    131400  -11.3400 -139.7300      15.1       327       199       100
WVCT   2025130    131400  -11.3400 -139.7700      14.7       329       202        97
WVCT   2025130    131400  -11.2800 -139.9400      12.2       340       241        97
WVCT   2025130    131400  -11.3000 -139.9600      11.3       342       241        98
WVCT   2025130    131400  -11.2800 -140.0500      10.1       352       235       100
WVCT   2025130    131400  -11.3400 -140.1900       9.0       349       242        99
WVCT   2025130    131400  -11.3200 -140.3000      10.8       334       233        97
WVCT   2025130    131400  -11.3400 -140.3200      10.8       335       233        95
WVCT   2025130    131400  -11.3400 -140.4300      10.7       343       228        85
WVCT   2025130    131400  -11.3200 -140.5400       7.5       346       220        76
WVCT   2025130    131400  -11.2600 -140.6500       7.7       324       220        94
WVCT   2025130    131400  -11.2800 -140.7300       7.2       323       223        99
WVCT   2025130    131400  -11.2800 -140.7800       7.2       337       225        96
WVCT   2025130    131400  -11.2600 -140.8700       6.3       346       229        98
WVCT   2025130    131400  -11.4200 -132.7200       5.8        10       208        99
WVCT   2025130    131400  -11.4400 -132.8400       5.5        12       206        99
WVCT   2025130    131400  -11.4500 -132.8900       6.0        12       203        98
WVCT   2025130    131400  -11.4500 -133.0200       8.6        20       200        93
WVCT   2025130    131400  -11.4500 -133.0400       9.1        20       203        93
WVCT   2025130    131400  -11.4500 -133.2100      19.0        35       206        72
WVCT   2025130    131400  -11.4300 -133.2500      11.3        28       196        92
WVCT   2025130    131400  -11.3800 -133.3200       6.6        16       181        90
WVCT   2025130    131400  -11.4000 -133.4300       8.3         7       179        94
WVCT   2025130    131400  -11.3800 -133.5800       9.7        21       181        96
WVCT   2025130    131400  -11.4500 -133.6700       7.0        18       191        98
WVCT   2025130    131400  -11.4300 -133.7300       6.3         8       195        98
WVCT   2025130    131400  -11.3700 -133.7900       4.5       351       200        80
WVCT   2025130    131400  -11.3700 -133.9500       7.7         5       194        99
WVCT   2025130    131400  -11.4300 -134.0500       9.3        19       194        93
WVCT   2025130    131400  -11.4300 -134.1200       9.7        24       216        71
WVCT   2025130    131400  -11.4300 -134.2300      10.4        28       222        85
WVCT   2025130    131400  -11.4100 -134.2500      10.2        28       222        95
WVCT   2025130    131400  -11.3700 -134.4000      10.1        40       216        97
WVCT   2025130    131400  -11.3700 -134.4700      10.9        36       211        95
WVCT   2025130    131400  -11.4500 -134.5300      11.5        17       213        99
WVCT   2025130    131400  -11.4300 -134.6800      17.6         7       213        98
WVCT   2025130    131400  -11.3900 -135.2000      13.1         7       202        95
WVCT   2025130    131400  -11.4400 -135.2500      11.2       359       200        99
WVCT   2025130    131400  -11.3700 -135.3600      12.8         8       193       100
WVCT   2025130    131400  -11.3700 -135.4800       7.0         0       189        98
WVCT   2025130    131400  -11.3700 -135.5500       6.6         2       188        96
WVCT   2025130    131400  -11.3900 -135.6200      10.6         5       221        96
WVCT   2025130    131400  -11.4400 -135.7300      14.2         5       226        99
WVCT   2025130    131400  -11.4200 -135.7900      14.5         7       224        99
WVCT   2025130    131400  -11.4400 -135.9200      12.5         0       204        95
WVCT   2025130    131400  -11.3700 -135.9900      13.1       359       188        93
WVCT   2025130    131400  -11.3800 -136.1000      14.2         1       188        96
WVCT   2025130    131400  -11.4000 -136.1800      13.3       359       189        99
WVCT   2025130    131400  -11.3600 -136.3100      12.5         7       189        99
WVCT   2025130    131400  -11.3600 -136.3300      13.4         3       188        94
WVCT   2025130    131400  -11.4400 -136.4500      18.7         5       188        99
WVCT   2025130    131400  -11.4400 -136.5100      19.1         3       186        95
WVCT   2025130    131400  -11.3600 -136.6600      18.5        13       168        87
WVCT   2025130    131400  -11.3600 -136.7100      17.2        27       167        89
WVCT   2025130    131400  -11.3600 -137.0800      13.3       356       163        74
WVCT   2025130    131400  -11.3800 -137.1800      12.4       349       164        99
WVCT   2025130    131400  -11.3800 -137.2700      11.0       352       164        63
WVCT   2025130    131400  -11.3800 -137.8800      13.1       358       160        85
WVCT   2025130    131400  -11.3600 -137.9500      12.9       333       160        76
WVCT   2025130    131400  -11.4000 -137.9900      16.8       314       160        65
WVCT   2025130    131400  -11.4000 -138.4800      13.9        61       162        83
WVCT   2025130    131400  -11.3800 -138.5400      14.4        64       163        70
WVCT   2025130    131400  -11.4000 -138.6300      14.9        60       167        99
WVCT   2025130    131400  -11.3800 -138.7600      18.9        52       169        64
WVCT   2025130    131400  -11.3600 -138.8300      18.7        29       176        66
WVCT   2025130    131400  -11.3600 -138.9300      17.1        23       176        99
WVCT   2025130    131400  -11.4300 -139.0500      16.4         5       173        75
WVCT   2025130    131400  -11.3800 -139.1600      14.3       347       171        93
WVCT   2025130    131400  -11.4300 -139.2600      14.4       339       179        98
WVCT   2025130    131400  -11.4300 -139.2700      14.5       337       186        99
WVCT   2025130    131400  -11.4300 -139.3800      14.9       333       176       100
WVCT   2025130    131400  -11.3800 -139.4600      15.1       327       178        98
WVCT   2025130    131400  -11.4100 -139.5900      15.2       322       195       100
WVCT   2025130    131400  -11.3800 -139.6800      15.1       326       196       100
WVCT   2025130    131400  -11.3600 -139.7300      14.9       327       197       100
WVCT   2025130    131400  -11.4300 -139.8600      10.7       338       218        90
WVCT   2025130    131400  -11.3600 -139.9200      10.6       342       242        89
WVCT   2025130    131400  -11.4100 -140.0100       7.7         1       253        99
WVCT   2025130    131400  -11.3800 -140.1400       7.5       359       246       100
WVCT   2025130    131400  -11.3800 -140.2100       8.3       350       243        99
WVCT   2025130    131400  -11.4100 -140.2900       9.0       332       238        96
WVCT   2025130    131400  -11.3600 -140.4300      11.0       342       228        88
WVCT   2025130    131400  -11.4100 -140.5300      10.3       344       229        98
WVCT   2025130    131400  -11.4300 -140.6400      10.3       350       218        96
WVCT   2025130    131400  -11.4300 -140.6700       9.7       353       218        99
WVCT   2025130    131400  -11.4700 -132.7000       6.0         9       208        99
WVCT   2025130    131400  -11.5100 -132.7800       5.2        10       208        83
WVCT   2025130    131400  -11.4900 -132.8700       4.8         7       206        91
WVCT   2025130    131400  -11.5300 -133.0200      10.3        27       207        95
WVCT   2025130    131400  -11.4900 -133.0800      11.5        27       210        93
WVCT   2025130    131400  -11.5500 -133.2000      16.1        36       213        71
WVCT   2025130    131400  -11.5300 -133.2400      13.0        30       196        99
WVCT   2025130    131400  -11.5100 -133.3200      12.1        24       180       100
WVCT   2025130    131400  -11.4900 -133.4500      11.9        16       176        92
WVCT   2025130    131400  -11.5400 -133.5400       9.7        16       177        99
WVCT   2025130    131400  -11.4700 -133.6700       6.8        16       190        99
WVCT   2025130    131400  -11.4700 -133.7100       7.2        15       193       100
WVCT   2025130    131400  -11.4900 -133.8400       8.9         8       193        95
WVCT   2025130    131400  -11.5400 -133.9500       9.0        14       191        95
WVCT   2025130    131400  -11.5200 -134.0200       9.8        22       194        95
WVCT   2025130    131400  -11.4700 -134.1200       9.9        26       214        71
WVCT   2025130    131400  -11.4700 -134.1900      10.7        31       221        85
WVCT   2025130    131400  -11.4700 -134.3100      11.0        31       221        99
WVCT   2025130    131400  -11.4700 -134.3400      12.0        34       221        95
WVCT   2025130    131400  -11.5400 -134.4500      10.2        24       223        92
WVCT   2025130    131400  -11.5000 -134.6000      13.2        14       204        96
WVCT   2025130    131400  -11.5200 -134.6200      13.4        14       202        96
WVCT   2025130    131400  -11.4600 -134.9500      14.0        37       209        94
WVCT   2025130    131400  -11.4600 -135.1800      10.9       344       204        67
WVCT   2025130    131400  -11.4600 -135.2700      11.4       351       200        99
WVCT   2025130    131400  -11.5200 -135.3100      12.7       331       201        97
WVCT   2025130    131400  -11.5000 -135.4700      11.3       355       191        99
WVCT   2025130    131400  -11.5200 -135.4900      12.2       355       190        99
WVCT   2025130    131400  -11.5400 -135.5800      13.5       359       189       100
WVCT   2025130    131400  -11.5200 -135.7300      13.2       357       227        98
WVCT   2025130    131400  -11.5300 -135.7900      12.8       356       231       100
WVCT   2025130    131400  -11.4600 -135.9400      11.9       360       204        86
WVCT   2025130    131400  -11.4600 -136.1000      13.4       356       188        99
WVCT   2025130    131400  -11.5000 -136.2100      13.4         1       189        90
WVCT   2025130    131400  -11.4800 -136.2700      13.2         1       189        93
WVCT   2025130    131400  -11.4800 -136.3800      16.9         1       189        95
WVCT   2025130    131400  -11.4600 -136.4700      18.7         4       189        96
WVCT   2025130    131400  -11.4600 -136.5100      18.9         4       187        93
WVCT   2025130    131400  -11.5100 -136.6600      13.6       358       184       100
WVCT   2025130    131400  -11.4800 -136.7300      12.7       357       179        88
WVCT   2025130    131400  -11.5100 -136.9000       9.3        16       185        60
WVCT   2025130    131400  -11.4900 -137.1600      11.0         1       170        85
WVCT   2025130    131400  -11.4500 -138.6100       8.3        90       167       100
WVCT   2025130    131400  -11.4900 -138.6800       8.1        93       169        67
WVCT   2025130    131400  -11.4500 -138.8900      15.6         4       172       100
WVCT   2025130    131400  -11.4500 -138.9600      16.9         8       174        96
WVCT   2025130    131400  -11.4700 -139.0500      16.6         2       174        76
WVCT   2025130    131400  -11.4700 -139.1600      15.6       355       175        93
WVCT   2025130    131400  -11.4500 -139.2600      14.4       340       179        99
WVCT   2025130    131400  -11.5100 -139.2900      14.3       341       186       100
WVCT   2025130    131400  -11.4700 -139.4000      15.2       333       176       100
WVCT   2025130    131400  -11.4500 -139.4800      15.2       328       192        98
WVCT   2025130    131400  -11.5300 -139.5500      16.0       320       194       100
WVCT   2025130    131400  -11.5100 -139.7000      16.7       322       195        99
WVCT   2025130    131400  -11.4900 -139.7900      12.9       330       200        89
WVCT   2025130    131400  -11.4700 -139.8600      10.7       341       217        88
WVCT   2025130    131400  -11.5300 -139.9900      11.0       359       252        97
WVCT   2025130    131400  -11.4500 -140.0700       9.4         7       254        97
WVCT   2025130    131400  -11.4700 -140.1000      10.0         8       253        97
WVCT   2025130    131400  -11.4500 -140.2700       8.4       331       243        83
WVCT   2025130    131400  -11.4500 -140.3200       8.1       325       240        90
WVCT   2025130    131400  -11.5100 -140.4000       6.5       322       241        88
WVCT   2025130    131400  -11.4700 -140.5400      10.4       340       232       100
WVCT   2025130    131400  -11.5300 -140.5800       8.8       336       224        89
WVCT   2025130    131400  -11.5700 -132.7200       7.3        24       206        84
WVCT   2025130    131400  -11.5700 -132.7700       6.0        13       207        85
WVCT   2025130    131400  -11.6400 -132.8800       7.8        12       205        89
WVCT   2025130    131400  -11.5800 -133.0200      10.8        28       207        96
WVCT   2025130    131400  -11.5700 -133.0400      11.7        29       207        91
WVCT   2025130    131400  -11.5600 -133.1900      15.6        37       214        65
WVCT   2025130    131400  -11.6000 -133.3700       8.2         5       173        89
WVCT   2025130    131400  -11.5800 -133.4100       9.0         7       173        97
WVCT   2025130    131400  -11.5800 -133.5000      10.7        18       176       100
WVCT   2025130    131400  -11.6200 -133.6700       8.2        10       181        98
WVCT   2025130    131400  -11.5600 -133.7100       8.3        16       186        99
WVCT   2025130    131400  -11.6200 -133.7800      10.1        18       186        99
WVCT   2025130    131400  -11.5800 -133.9300       9.3        17       190        93
WVCT   2025130    131400  -11.6000 -134.0000       9.2        21       191        91
WVCT   2025130    131400  -11.5800 -134.1200      10.9        28       194        90
WVCT   2025130    131400  -11.5600 -134.1500      11.4        30       194        84
WVCT   2025130    131400  -11.5600 -134.2800      11.5        26       196        94
WVCT   2025130    131400  -11.5800 -134.4300       9.3        21       221        98
WVCT   2025130    131400  -11.6300 -134.5600       8.1        13       206        95
WVCT   2025130    131400  -11.5600 -134.6200      11.8        19       203        91
WVCT   2025130    131400  -11.5600 -134.7900      12.8        37       208        63
WVCT   2025130    131400  -11.5600 -134.8000      12.9        35       209        69
WVCT   2025130    131400  -11.6300 -134.9000      15.2        27       208        99
WVCT   2025130    131400  -11.6300 -135.3800      13.0       335       198        97
WVCT   2025130    131400  -11.6300 -135.4100      12.6       345       196       100
WVCT   2025130    131400  -11.6300 -135.5300      13.8       356       191       100
WVCT   2025130    131400  -11.6300 -135.6400      14.0       360       221       100
WVCT   2025130    131400  -11.5700 -135.7500      12.9       354       227       100
WVCT   2025130    131400  -11.5500 -135.7700      12.8       354       229       100
WVCT   2025130    131400  -11.5500 -135.9300      11.4       352       220        66
WVCT   2025130    131400  -11.5700 -135.9500      13.1       351       220        90
WVCT   2025130    131400  -11.6100 -136.2100      13.1       355       204        90
WVCT   2025130    131400  -11.6300 -136.2800      14.9         4       189       100
WVCT   2025130    131400  -11.6300 -136.3800      12.5         4       189        85
WVCT   2025130    131400  -11.5500 -136.4900      14.8         2       189        79
WVCT   2025130    131400  -11.5500 -136.5800      13.8        10       188        98
WVCT   2025130    131400  -11.6100 -136.6700      13.8        17       188        77
WVCT   2025130    131400  -11.5700 -136.7700      13.0       359       188        90
WVCT   2025130    131400  -11.5900 -136.8200      12.8       349       190        74
WVCT   2025130    131400  -11.5700 -136.8800      10.9       352       188        74
WVCT   2025130    131400  -11.5500 -138.7400       7.0        98       170        65
WVCT   2025130    131400  -11.6000 -138.8500       4.2       108       174        60
WVCT   2025130    131400  -11.5600 -139.1600      14.0       357       176        95
WVCT   2025130    131400  -11.5500 -139.2000      14.3       352       176        99
WVCT   2025130    131400  -11.6200 -139.3300      15.7       331       193        99
WVCT   2025130    131400  -11.5600 -139.4400      15.9       326       195       100
WVCT   2025130    131400  -11.6000 -139.5100      15.8       319       194       100
WVCT   2025130    131400  -11.6000 -139.5700      15.5       319       193       100
WVCT   2025130    131400  -11.5400 -139.7200      15.6       325       193        98
WVCT   2025130    131400  -11.5800 -139.7700      13.8       334       196        94
WVCT   2025130    131400  -11.5600 -139.8800      10.7       347       224        87
WVCT   2025130    131400  -11.5600 -139.9200      10.4       352       233        89
WVCT   2025130    131400  -11.6200 -140.0600       8.2         6       239        99
WVCT   2025130    131400  -11.5800 -140.1000       9.6         8       244        99
WVCT   2025130    131400  -11.6200 -140.2300       4.8        15       231        79
WVCT   2025130    131400  -11.5800 -140.2900       5.9       318       240        72
WVCT   2025130    131400  -11.5400 -140.4500       7.2       327       242        96
WVCT   2025130    131400  -11.6000 -140.4900       5.8       324       233        91
WVCT   2025130    131400  -11.5400 -140.5800       8.2       334       224        90
WVCT   2025130    131400  -11.7400 -132.7300       9.0        14       174        90
WVCT   2025130    131400  -11.7400 -132.7700       9.0        12       175        92
WVCT   2025130    131400  -11.7300 -132.9200       9.1        16       197       100
WVCT   2025130    131400  -11.6800 -133.0000       9.5        21       204        98
WVCT   2025130    131400  -11.6800 -133.1100      10.1        23       211       100
WVCT   2025130    131400  -11.6600 -133.1300       9.9        24       214       100
WVCT   2025130    131400  -11.7000 -133.2700       8.3        15       194       100
WVCT   2025130    131400  -11.7300 -133.3900       7.3         2       179        98
WVCT   2025130    131400  -11.7300 -133.4400       6.9       356       185       100
WVCT   2025130    131400  -11.7100 -133.5500       8.4        10       184        94
WVCT   2025130    131400  -11.7300 -133.6500       9.3        14       182        99
WVCT   2025130    131400  -11.6900 -133.7600       9.1        10       184        96
WVCT   2025130    131400  -11.6700 -133.7800       9.5        14       184        94
WVCT   2025130    131400  -11.6500 -133.9500       7.8        11       190        97
WVCT   2025130    131400  -11.6700 -134.0000       8.6        17       192        99
WVCT   2025130    131400  -11.7100 -134.0800      10.8        26       193        99
WVCT   2025130    131400  -11.7300 -134.1700      13.0        28       196       100
WVCT   2025130    131400  -11.7300 -134.2800      12.0        22       196        97
WVCT   2025130    131400  -11.6900 -134.3900       7.8        10       199       100
WVCT   2025130    131400  -11.6700 -134.4300       5.5       356       201        61
WVCT   2025130    131400  -11.6700 -134.5400       7.6        14       205        85
WVCT   2025130    131400  -11.6500 -134.6200       9.5        19       205        99
WVCT   2025130    131400  -11.6500 -134.7800      14.1        32       208        99
WVCT   2025130    131400  -11.6500 -134.8000      14.6        31       208        99
WVCT   2025130    131400  -11.7200 -134.9700      14.2        34       208        92
WVCT   2025130    131400  -11.7200 -134.9900      14.6        34       208        96
WVCT   2025130    131400  -11.7200 -135.2500      13.0       338       204        69
WVCT   2025130    131400  -11.6700 -135.3800      13.7       334       199        97
WVCT   2025130    131400  -11.6500 -135.4100      13.1       343       196       100
WVCT   2025130    131400  -11.6800 -135.5400      12.4       352       192        99
WVCT   2025130    131400  -11.7000 -135.6200      12.5       355       244       100
WVCT   2025130    131400  -11.6800 -135.6900      13.1       357       246       100
WVCT   2025130    131400  -11.6800 -135.7700      12.9       353       233       100
WVCT   2025130    131400  -11.6800 -135.9100      13.8       338       224        69
WVCT   2025130    131400  -11.6500 -135.9500      12.8       352       222        97
WVCT   2025130    131400  -11.6600 -136.2500      12.6       358       208        87
WVCT   2025130    131400  -11.6400 -136.3200      13.5         6       189        94
WVCT   2025130    131400  -11.6400 -136.4700      12.3       357       189        88
WVCT   2025130    131400  -11.6600 -136.5800      14.4        27       189        64
WVCT   2025130    131400  -11.6800 -136.6000      14.6        27       188        74
WVCT   2025130    131400  -11.6400 -136.7100      12.6        14       190        87
WVCT   2025130    131400  -11.6400 -136.7800      11.3       360       190        91
WVCT   2025130    131400  -11.6400 -136.9100      12.4       335       190        84
WVCT   2025130    131400  -11.6800 -137.0000      17.4       320       191        94
WVCT   2025130    131400  -11.7200 -137.3200       6.2        67       182        66
WVCT   2025130    131400  -11.6800 -137.5200       5.5       240       179        60
WVCT   2025130    131400  -11.7000 -138.4800       7.4       257       176        78
WVCT   2025130    131400  -11.6400 -138.5700       4.1       245       174        69
WVCT   2025130    131400  -11.6400 -139.1400      11.6       354       175        82
WVCT   2025130    131400  -11.7100 -139.2400      14.9       333       192        98
WVCT   2025130    131400  -11.7100 -139.2700      16.2       330       193        95
WVCT   2025130    131400  -11.7100 -139.4400      15.7       325       196        95
WVCT   2025130    131400  -11.6600 -139.5100      14.8       321       194        98
WVCT   2025130    131400  -11.6600 -139.6200      12.7       325       188        93
WVCT   2025130    131400  -11.6900 -139.7000      11.6       335       191        76
WVCT   2025130    131400  -11.6400 -139.7300      14.0       333       190        95
WVCT   2025130    131400  -11.7100 -139.8400      12.3       341       233        98
WVCT   2025130    131400  -11.7100 -139.9900       5.9       350       229        98
WVCT   2025130    131400  -11.7100 -140.0300       5.0         4       228        98
WVCT   2025130    131400  -11.6800 -140.1200       5.2        50       230        93
WVCT   2025130    131400  -11.6800 -140.2300       5.8        65       231        67
WVCT   2025130    131400  -11.6400 -140.4900       5.5       323       231        82
WVCT   2025130    131400  -11.7100 -140.5800       5.3       331       226        87
WVCT   2025130    131400  -11.6600 -140.7100      10.8         5       224        93
WVCT   2025130    131400  -11.7700 -132.6900       9.6        13       171        94
WVCT   2025130    131400  -11.8100 -132.8000       9.5        19       189        99
WVCT   2025130    131400  -11.7700 -132.8600       9.2        14       194        99
WVCT   2025130    131400  -11.7500 -132.9900       8.6        20       200        95
WVCT   2025130    131400  -11.7900 -133.0300       8.9        22       202        92
WVCT   2025130    131400  -11.8300 -133.2000       9.7        21       206        94
WVCT   2025130    131400  -11.7900 -133.2500      10.0        20       204        99
WVCT   2025130    131400  -11.8300 -133.3500       8.9         6       199        96
WVCT   2025130    131400  -11.7700 -133.4000       7.4       359       185        99
WVCT   2025130    131400  -11.7500 -133.5200       8.1         7       188        94
WVCT   2025130    131400  -11.7700 -133.6500       9.9        15       184        98
WVCT   2025130    131400  -11.8200 -133.7400       9.3        12       187        95
WVCT   2025130    131400  -11.8200 -133.7700       9.2         8       188        96
WVCT   2025130    131400  -11.7500 -133.9400       8.5        10       193        98
WVCT   2025130    131400  -11.8000 -133.9800       9.0        12       203        84
WVCT   2025130    131400  -11.7900 -134.0500      10.6        22       208        99
WVCT   2025130    131400  -11.8000 -134.1800      12.8        29       208       100
WVCT   2025130    131400  -11.8000 -134.3000      11.7        26       198       100
WVCT   2025130    131400  -11.7600 -134.3300      11.4        23       198        97
WVCT   2025130    131400  -11.8000 -134.5000       8.8        11       200        92
WVCT   2025130    131400  -11.7800 -134.5200       8.6        11       200        80
WVCT   2025130    131400  -11.7400 -134.6700      10.7        28       203        95
WVCT   2025130    131400  -11.8200 -134.7000      10.8        31       197       100
WVCT   2025130    131400  -11.7600 -134.8700      12.7        42       208        92
WVCT   2025130    131400  -11.8200 -134.9300      11.7        39       208        92
WVCT   2025130    131400  -11.7400 -134.9900      14.2        33       208        96
WVCT   2025130    131400  -11.7400 -135.2100      13.2       343       204        80
WVCT   2025130    131400  -11.7600 -135.3700      14.9       335       199        99
WVCT   2025130    131400  -11.7400 -135.3900      14.7       333       198       100
WVCT   2025130    131400  -11.7600 -135.5400      13.5       328       193        99
WVCT   2025130    131400  -11.7400 -135.7600      12.6       351       252       100
WVCT   2025130    131400  -11.7800 -136.4900      13.4       347       205        97
WVCT   2025130    131400  -11.8100 -136.5800      14.4       343       206       100
WVCT   2025130    131400  -11.8100 -136.6100      13.6       348       207        96
WVCT   2025130    131400  -11.7700 -136.7300      11.4         5       204        64
WVCT   2025130    131400  -11.7900 -136.8000       8.8         3       194        82
WVCT   2025130    131400  -11.7600 -136.9300      16.7       324       192        99
WVCT   2025130    131400  -11.7900 -136.9700      18.2       323       193        99
WVCT   2025130    131400  -11.7400 -137.3200       6.6        66       183        71
WVCT   2025130    131400  -11.7400 -137.3400       4.5        74       183        81
WVCT   2025130    131400  -11.8100 -138.7900      13.0       271       184        62
WVCT   2025130    131400  -11.8100 -139.0700       7.6       306       186        60
WVCT   2025130    131400  -11.7700 -139.1600      13.0       329       192        81
WVCT   2025130    131400  -11.7300 -139.2400      15.1       332       193        98
WVCT   2025130    131400  -11.7300 -139.3500      17.6       325       196        94
WVCT   2025130    131400  -11.7300 -139.4000      16.4       325       196        97
WVCT   2025130    131400  -11.7300 -139.4600      14.1       329       197        93
WVCT   2025130    131400  -11.7500 -139.6200       9.5       343       201        70
WVCT   2025130    131400  -11.7500 -139.6800      10.4       342       204        61
WVCT   2025130    131400  -11.7700 -139.7700      11.9       340       233        93
WVCT   2025130    131400  -11.7300 -139.8400      12.1       341       233        99
WVCT   2025130    131400  -11.7700 -139.9700       6.6       343       228        85
WVCT   2025130    131400  -11.7500 -140.0600       5.0        29       226        87
WVCT   2025130    131400  -11.7700 -140.1200       6.5        51       227        87
WVCT   2025130    131400  -11.7300 -140.2100       6.3        67       230        89
WVCT   2025130    131400  -11.8100 -140.3000      14.1       341       231        95
WVCT   2025130    131400  -11.8100 -140.4300      15.8       324       232        98
WVCT   2025130    131400  -11.8100 -140.5400      11.1       327       233        93
WVCT   2025130    131400  -11.7700 -140.6000       8.1       329       230        88
WVCT   2025130    131400  -11.8100 -140.6500       9.2       330       225        99
WVCT   2025130    131400  -11.9200 -132.7300       8.9        16       164        96
WVCT   2025130    131400  -11.8500 -132.8000       9.6        23       189       100
WVCT   2025130    131400  -11.9000 -132.9100       9.6        22       199        69
WVCT   2025130    131400  -11.8800 -132.9500       9.5        21       199        68
WVCT   2025130    131400  -11.9200 -133.0800      11.1        26       199        93
WVCT   2025130    131400  -11.8600 -133.1900       9.1        19       206        95
WVCT   2025130    131400  -11.9200 -133.2900       7.3         3       208       100
WVCT   2025130    131400  -11.8500 -133.3300       9.0         6       205        95
WVCT   2025130    131400  -11.8400 -133.4000       9.3         2       199        99
WVCT   2025130    131400  -11.9000 -133.5500      12.2        25       210        97
WVCT   2025130    131400  -11.8600 -133.5900      11.0        23       206        99
WVCT   2025130    131400  -11.8600 -133.7500       9.3        10       190        94
WVCT   2025130    131400  -11.8400 -133.7700       9.2         8       190        94
WVCT   2025130    131400  -11.9200 -133.9400      10.9        12       204        88
WVCT   2025130    131400  -11.9200 -134.0300      11.2        20       202        99
WVCT   2025130    131400  -11.9200 -134.0500      11.1        20       202        99
WVCT   2025130    131400  -11.8600 -134.1800      11.2        28       207       100
WVCT   2025130    131400  -11.8400 -134.2400      11.8        29       201       100
WVCT   2025130    131400  -11.9000 -134.4100       7.5         3       199        99
WVCT   2025130    131400  -11.8600 -134.4600       7.4         1       200        99
WVCT   2025130    131400  -11.9000 -134.5400       8.5         4       200        98
WVCT   2025130    131400  -11.8900 -134.6500      10.8        18       198        98
WVCT   2025130    131400  -11.9100 -134.7400      10.8        27       198        80
WVCT   2025130    131400  -11.8900 -134.8100      11.6        40       203        86
WVCT   2025130    131400  -11.8400 -134.9300      11.9        39       208        97
WVCT   2025130    131400  -11.8900 -134.9800      14.0        29       207        99
WVCT   2025130    131400  -11.8900 -135.1100      16.5        18       206        96
WVCT   2025130    131400  -11.9100 -135.2000      14.0         3       206        85
WVCT   2025130    131400  -11.8500 -135.3400      13.4       346       203       100
WVCT   2025130    131400  -11.8400 -135.3500      13.8       342       202        99
WVCT   2025130    131400  -11.8500 -135.5000      15.6       317       196       100
WVCT   2025130    131400  -11.8500 -135.5600      15.4       316       196        99
WVCT   2025130    131400  -11.8700 -135.6500      15.0       313       201        98
WVCT   2025130    131400  -11.8900 -136.3500      10.5       348       211        81
WVCT   2025130    131400  -11.8500 -136.4100      10.0       359       210        95
WVCT   2025130    131400  -11.8300 -136.4800      14.2       342       208        95
WVCT   2025130    131400  -11.8300 -136.6000      14.4       343       206        99
WVCT   2025130    131400  -11.8900 -136.7100      12.1         4       207        70
WVCT   2025130    131400  -11.8300 -136.8200       8.3       347       198        70
WVCT   2025130    131400  -11.9000 -136.9100      14.9       314       201        79
WVCT   2025130    131400  -11.9000 -136.9300      15.7       315       201        83
WVCT   2025130    131400  -11.8500 -137.0400      22.0       326       194       100
WVCT   2025130    131400  -11.8900 -137.2200      20.9       326       190        67
WVCT   2025130    131400  -11.8800 -138.1700      10.2       128       185        74
WVCT   2025130    131400  -11.8600 -138.6300      13.2       266       185        83
WVCT   2025130    131400  -11.8400 -138.7600      15.8       269       184        63
WVCT   2025130    131400  -11.8800 -139.0100       6.8       277       188        95
WVCT   2025130    131400  -11.8400 -139.1100      11.5       306       192        90
WVCT   2025130    131400  -11.8800 -139.1800      13.0       313       194        91
WVCT   2025130    131400  -11.9000 -139.3100       7.2       342       197        65
WVCT   2025130    131400  -11.9000 -139.4000       6.5       345       200        96
WVCT   2025130    131400  -11.8600 -139.4700       8.7       346       199        91
WVCT   2025130    131400  -11.8300 -139.5700       9.8       347       201        85
WVCT   2025130    131400  -11.8400 -139.6000       9.9       346       205        84
WVCT   2025130    131400  -11.9000 -139.7700       7.2       335       232        95
WVCT   2025130    131400  -11.8200 -139.8100       9.0       332       232        99
WVCT   2025130    131400  -11.8800 -139.9500       7.9       323       230        95
WVCT   2025130    131400  -11.8600 -140.0500       9.0       341       229        64
WVCT   2025130    131400  -11.8200 -140.1900      10.8        22       228        82
WVCT   2025130    131400  -11.8800 -140.3200      16.7       335       225        98
WVCT   2025130    131400  -11.8800 -140.3400      17.2       333       225        98
WVCT   2025130    131400  -11.9000 -140.4700      14.8       331       233        94
WVCT   2025130    131400  -11.8600 -140.6000      12.3       328       233        91
WVCT   2025130    131400  -12.0200 -132.6700       8.5        14       169        90
WVCT   2025130    131400  -11.9400 -132.7400       9.1        18       165        96
WVCT   2025130    131400  -11.9600 -133.1400       9.4        18       206        83
WVCT   2025130    131400  -11.9400 -133.2900       7.3         5       209       100
WVCT   2025130    131400  -11.9400 -133.3000       7.7         5       210       100
WVCT   2025130    131400  -12.0100 -133.4700      12.2        26       208        98
WVCT   2025130    131400  -12.0100 -133.4900      12.3        27       208        98
WVCT   2025130    131400  -12.0100 -133.6400       7.2        13       220        99
WVCT   2025130    131400  -11.9600 -133.7000       9.0        15       218        99
WVCT   2025130    131400  -11.9900 -133.8400      11.8         5       203        99
WVCT   2025130    131400  -11.9500 -133.9000      11.4         7       203        92
WVCT   2025130    131400  -11.9400 -134.0300      11.6        20       200        99
WVCT   2025130    131400  -11.9300 -134.1300      10.0        22       200        98
WVCT   2025130    131400  -12.0100 -134.2200       8.2        15       199       100
WVCT   2025130    131400  -11.9900 -134.2400       7.9        15       200       100
WVCT   2025130    131400  -11.9900 -134.3300       7.4        10       199        92
WVCT   2025130    131400  -11.9900 -134.4800       8.1         4       199        94
WVCT   2025130    131400  -12.0100 -134.5300       8.9         8       200        92
WVCT   2025130    131400  -12.0100 -134.6800       9.9        15       208       100
WVCT   2025130    131400  -11.9900 -134.7000      10.0        18       206        96
WVCT   2025130    131400  -11.9700 -134.8700      13.4        24       207       100
WVCT   2025130    131400  -11.9500 -134.9400      13.5        24       208        99
WVCT   2025130    131400  -12.0100 -135.0300      15.4        25       207        94
WVCT   2025130    131400  -12.0000 -135.1300      14.7        19       206        83
WVCT   2025130    131400  -12.0000 -135.2400      11.3         6       207        73
WVCT   2025130    131400  -12.0000 -135.2600      10.6         3       207        69
WVCT   2025130    131400  -11.9500 -135.3700       9.6       340       205        93
WVCT   2025130    131400  -12.0000 -135.4600       9.4       330       203        79
WVCT   2025130    131400  -11.9300 -135.5400      14.6       313       197        99
WVCT   2025130    131400  -11.9800 -135.9800       5.7       319       217        75
WVCT   2025130    131400  -12.0000 -136.0000       6.8       329       207        91
WVCT   2025130    131400  -12.0000 -136.2400       4.1       346       209        85
WVCT   2025130    131400  -11.9600 -136.4400      14.0       314       213        61
WVCT   2025130    131400  -11.9200 -136.5000      15.6       329       208        88
WVCT   2025130    131400  -12.0000 -136.8500      15.5       309       202        99
WVCT   2025130    131400  -11.9800 -136.9100      15.5       309       202        92
WVCT   2025130    131400  -11.9200 -136.9600      17.7       317       200        92
WVCT   2025130    131400  -11.9600 -137.0900      17.5       325       191        68
WVCT   2025130    131400  -11.9200 -137.1500      18.5       328       191        67
WVCT   2025130    131400  -11.9400 -137.2400      13.3       338       191        78
WVCT   2025130    131400  -12.0000 -138.0700      12.9       130       189        94
WVCT   2025130    131400  -11.9200 -138.2200       6.7       122       188        68
WVCT   2025130    131400  -11.9600 -138.2900       6.1       108       189        70
WVCT   2025130    131400  -11.9400 -138.6300      11.0       283       187        69
WVCT   2025130    131400  -11.9400 -138.7900      14.6       276       186        99
WVCT   2025130    131400  -11.9200 -138.8100      15.0       275       186        83
WVCT   2025130    131400  -11.9400 -138.9200       6.6       282       187        77
WVCT   2025130    131400  -11.9800 -138.9900       8.3       276       189       100
WVCT   2025130    131400  -11.9900 -139.0900      13.6       275       201        76
WVCT   2025130    131400  -11.9400 -139.4400       7.4       349       200        94
WVCT   2025130    131400  -11.9200 -139.5300      10.7       353       222        92
WVCT   2025130    131400  -11.9200 -139.5500      12.4       358       226        95
WVCT   2025130    131400  -11.9200 -139.7100       9.3       344       232        94
WVCT   2025130    131400  -11.9200 -139.7500       8.0       342       232        93
WVCT   2025130    131400  -11.9400 -139.8400       4.9       335       231        63
WVCT   2025130    131400  -11.9200 -139.9700       9.0       323       230        84
WVCT   2025130    131400  -11.9700 -140.0600      10.2       323       233        86
WVCT   2025130    131400  -11.9600 -140.1200       9.2       334       233        70
WVCT   2025130    131400  -11.9900 -140.2300      10.3       316       230        94
WVCT   2025130    131400  -11.9600 -140.3000      14.1       330       228        97
WVCT   2025130    131400  -11.9400 -140.4100      14.7       330       232        99
WVCT   2025130    131400  -11.9200 -140.4900      14.3       330       233        91
WVCT   2025130    131400  -11.9200 -140.6400      10.0       320       227        71
WVCT   2025130    131400  -11.9400 -140.7100       6.0       310       222        60
WVCT   2025130    131400  -11.9700 -140.7500       4.8       307       221        77
WVCT   2025130    131400  -11.9900 -140.8800      17.1       347       225        82
WVCT   2025130    131400  -12.0400 -132.6500       8.8        15       170        87
WVCT   2025130    131400  -12.0900 -132.7900       7.1       359       185        97
WVCT   2025130    131400  -12.0900 -133.1500       7.6         7       214       100
WVCT   2025130    131400  -12.0300 -133.2500       7.1         7       213        97
WVCT   2025130    131400  -12.0900 -133.3700      10.0        27       202       100
WVCT   2025130    131400  -12.0500 -133.4100      11.2        29       208       100
WVCT   2025130    131400  -12.0900 -133.5600       9.2        20       204        98
WVCT   2025130    131400  -12.0300 -133.6200       7.3        14       219        97
WVCT   2025130    131400  -12.1100 -133.7100       7.7       343       216        94
WVCT   2025130    131400  -12.1000 -133.8400      12.4         5       205        98
WVCT   2025130    131400  -12.0900 -133.8600      12.6         5       205        99
WVCT   2025130    131400  -12.0900 -134.0100      12.3        19       200       100
WVCT   2025130    131400  -12.0300 -134.1000      10.5        17       199        99
WVCT   2025130    131400  -12.0800 -134.2000       8.5        15       198        99
WVCT   2025130    131400  -12.0300 -134.2500       7.4        12       199        91
WVCT   2025130    131400  -12.1000 -134.3800       8.5        17       199        93
WVCT   2025130    131400  -12.1000 -134.4600       8.8        15       204        97
WVCT   2025130    131400  -12.1000 -134.5300       9.0        14       213        92
WVCT   2025130    131400  -12.0400 -134.6400      10.0        13       210        89
WVCT   2025130    131400  -12.1000 -134.7700      12.3        16       221        97
WVCT   2025130    131400  -12.1000 -134.8300      13.2        19       216       100
WVCT   2025130    131400  -12.0800 -134.9000      13.8        21       207       100
WVCT   2025130    131400  -12.1000 -134.9800      13.7        23       206        97
WVCT   2025130    131400  -12.0800 -135.1400      13.4        16       208        93
WVCT   2025130    131400  -12.0800 -135.1600      13.6        16       207        90
WVCT   2025130    131400  -12.0200 -135.2800      10.5         5       207        65
WVCT   2025130    131400  -12.1000 -135.4200       8.4       344       205        76
WVCT   2025130    131400  -12.0200 -135.4400       9.0       329       203        74
WVCT   2025130    131400  -12.0400 -135.8100      12.5       307       200        94
WVCT   2025130    131400  -12.1000 -135.9800       9.4       341       188        97
WVCT   2025130    131400  -12.0400 -136.0200       8.6       341       189        96
WVCT   2025130    131400  -12.0900 -136.1500       8.6       349       188       100
WVCT   2025130    131400  -12.0900 -136.2400       6.9       344       208        91
WVCT   2025130    131400  -12.0600 -136.2800       5.2       336       211        78
WVCT   2025130    131400  -12.0600 -136.4100       5.7       335       216        91
WVCT   2025130    131400  -12.0600 -136.5400       8.7       339       216        88
WVCT   2025130    131400  -12.0900 -136.5700       7.9       338       217        95
WVCT   2025130    131400  -12.0600 -136.7800      17.0       312       202        98
WVCT   2025130    131400  -12.0200 -136.9100      15.2       310       202       100
WVCT   2025130    131400  -12.0900 -137.0000      12.5       332       193        62
WVCT   2025130    131400  -12.0400 -137.0400      14.7       325       191        97
WVCT   2025130    131400  -12.0500 -137.8100      20.8       140       191        92
WVCT   2025130    131400  -12.0700 -138.2900      10.1        93       193        71
WVCT   2025130    131400  -12.0500 -138.3800      10.5        97       192        88
WVCT   2025130    131400  -12.0500 -138.4000       9.0       100       192        94
WVCT   2025130    131400  -12.0700 -138.7200       4.8       300       202        69
WVCT   2025130    131400  -12.0300 -139.0700      12.2       265       204        99
WVCT   2025130    131400  -12.0900 -139.3800      10.9         3       208        79
WVCT   2025130    131400  -12.0900 -139.4900      13.7       359       221        99
WVCT   2025130    131400  -12.0300 -139.5500      14.8       359       228        98
WVCT   2025130    131400  -12.0900 -139.6800      16.9       352       234        98
WVCT   2025130    131400  -12.0500 -139.7300      14.0       351       235        99
WVCT   2025130    131400  -12.0500 -139.7900      12.4       349       235        99
WVCT   2025130    131400  -12.0900 -139.9300      13.6       341       234        96
WVCT   2025130    131400  -12.0500 -140.0500      10.1       326       233        97
WVCT   2025130    131400  -12.0100 -140.1000       9.2       315       233       100
WVCT   2025130    131400  -12.0100 -140.2100       8.6       310       230        96
WVCT   2025130    131400  -12.0900 -140.2700       6.5       292       228       100
WVCT   2025130    131400  -12.0900 -140.3600       6.5       288       228        95
WVCT   2025130    131400  -12.0700 -140.5100       8.5       310       229        82
WVCT   2025130    131400  -12.0900 -140.6000       9.2       315       227        65
WVCT   2025130    131400  -12.0900 -140.7600       4.0       341       220        65
WVCT   2025130    131400  -12.0900 -140.8000       6.7       349       217        99
WVCT   2025130    131400  -12.0700 -140.9100      11.6       357       208        93
WVCT   2025130    131400  -12.1900 -132.7200       8.4        11       180        99
WVCT   2025130    131400  -12.1700 -132.7400       8.4        10       181       100
WVCT   2025130    131400  -12.2000 -132.8300       7.2         0       184        99
WVCT   2025130    131400  -12.2000 -132.9600       6.7         4       195        90
WVCT   2025130    131400  -12.1300 -133.0700       8.4        13       211        93
WVCT   2025130    131400  -12.1600 -133.1800       8.6        11       219        99
WVCT   2025130    131400  -12.1500 -133.2000       8.5        10       217        98
WVCT   2025130    131400  -12.2000 -133.3000       9.8        17       202       100
WVCT   2025130    131400  -12.1600 -133.3900       9.8        26       191       100
WVCT   2025130    131400  -12.1600 -133.4800      10.3        32       193        99
WVCT   2025130    131400  -12.1200 -133.6500       6.7       343       216        91
WVCT   2025130    131400  -12.1200 -133.6900       7.6       342       216        92
WVCT   2025130    131400  -12.1200 -133.8200      12.2         4       206        98
WVCT   2025130    131400  -12.2000 -133.9300      10.4        19       202        99
WVCT   2025130    131400  -12.1800 -133.9500      10.5        20       201        99
WVCT   2025130    131400  -12.2000 -134.0600      10.9        22       199        99
WVCT   2025130    131400  -12.2000 -134.1700       9.8        19       195        97
WVCT   2025130    131400  -12.1200 -134.3100       8.6        17       197        93
WVCT   2025130    131400  -12.1200 -134.3600       8.8        17       198        92
WVCT   2025130    131400  -12.1200 -134.4400       8.9        16       201        98
WVCT   2025130    131400  -12.1200 -134.5100       9.0        15       211        95
WVCT   2025130    131400  -12.1900 -134.6800      12.0        21       224        98
WVCT   2025130    131400  -12.1900 -134.7000      12.1        21       225        98
WVCT   2025130    131400  -12.1900 -134.8100      12.9        23       226       100
WVCT   2025130    131400  -12.1400 -134.8800      13.3        23       214        99
WVCT   2025130    131400  -12.1200 -135.0100      13.2        18       207        95
WVCT   2025130    131400  -12.1900 -135.0900      12.2        11       208        99
WVCT   2025130    131400  -12.1400 -135.1800      13.5        16       204        94
WVCT   2025130    131400  -12.1500 -135.3300      16.0        18       207        93
WVCT   2025130    131400  -12.1200 -135.4000       9.6       359       207        74
WVCT   2025130    131400  -12.1200 -135.4400       8.4       347       205        73
WVCT   2025130    131400  -12.1300 -135.6100       7.4       315       204        87
WVCT   2025130    131400  -12.1200 -135.6300       8.4       308       202        89
WVCT   2025130    131400  -12.1700 -135.7900      10.8       320       202        99
WVCT   2025130    131400  -12.1700 -135.8100      10.9       323       202        98
WVCT   2025130    131400  -12.1900 -135.9400      11.4       347       192        89
WVCT   2025130    131400  -12.1300 -136.0000      10.4       346       187        93
WVCT   2025130    131400  -12.1900 -136.1400      10.4       349       187        93
WVCT   2025130    131400  -12.1900 -136.2400       9.3       340       192        86
WVCT   2025130    131400  -12.1100 -136.2800       6.7       338       210        74
WVCT   2025130    131400  -12.1300 -136.4400       7.4       341       218        91
WVCT   2025130    131400  -12.1300 -136.4800       8.4       342       218        97
WVCT   2025130    131400  -12.1100 -136.6100       6.7       336       213        90
WVCT   2025130    131400  -12.1500 -136.7600       7.5       341       206        86
WVCT   2025130    131400  -12.1100 -136.8900      16.2       322       203        80
WVCT   2025130    131400  -12.1100 -137.0200      12.1       336       192        62
WVCT   2025130    131400  -12.1700 -137.2400      18.9       306       195        86
WVCT   2025130    131400  -12.1100 -137.3700      23.6       301       195        65
WVCT   2025130    131400  -12.1100 -137.3900      24.1       300       195        69
WVCT   2025130    131400  -12.1800 -137.6400       5.4       293       204        67
WVCT   2025130    131400  -12.1500 -137.8500      14.3       134       193        67
WVCT   2025130    131400  -12.1600 -137.9800      16.0       123       196        75
WVCT   2025130    131400  -12.1800 -138.4800      14.7       101       216        81
WVCT   2025130    131400  -12.1100 -139.1200       6.9       262       204        61
WVCT   2025130    131400  -12.1300 -139.1400       5.8       263       204        65
WVCT   2025130    131400  -12.1100 -139.3800      11.6       360       208        82
WVCT   2025130    131400  -12.1100 -139.4900      14.0       358       218        99
WVCT   2025130    131400  -12.1100 -139.5100      14.3       358       221        99
WVCT   2025130    131400  -12.1100 -139.6800      16.9       350       234        97
WVCT   2025130    131400  -12.1100 -139.7300      15.9       346       235        99
WVCT   2025130    131400  -12.1600 -139.8600      16.0       348       235        99
WVCT   2025130    131400  -12.1600 -139.8800      16.1       349       235        99
WVCT   2025130    131400  -12.1600 -139.9700      12.2       337       234        99
WVCT   2025130    131400  -12.1100 -140.1200       8.6       308       233        70
WVCT   2025130    131400  -12.1100 -140.2300       5.4       279       229        98
WVCT   2025130    131400  -12.1100 -140.2800       5.6       284       227        99
WVCT   2025130    131400  -12.1100 -140.3800       5.5       276       228        80
WVCT   2025130    131400  -12.1800 -140.6000       9.5       306       226        77
WVCT   2025130    131400  -12.1600 -140.6500       7.9       328       221        70
WVCT   2025130    131400  -12.1100 -140.7800       5.6       347       216        98
WVCT   2025130    131400  -12.1100 -140.8000       6.0       353       214        96
WVCT   2025130    131400  -12.2600 -132.6400       8.3        11       171        94
WVCT   2025130    131400  -12.3000 -132.8100       7.8        12       179        95
WVCT   2025130    131400  -12.2600 -132.8400       7.6         9       184        91
WVCT   2025130    131400  -12.2800 -132.9200       8.3        14       190        98
WVCT   2025130    131400  -12.2400 -133.0900       8.0        13       201       100
WVCT   2025130    131400  -12.2400 -133.1100       8.2        13       203       100
WVCT   2025130    131400  -12.3000 -133.2700       9.7        14       209        98
WVCT   2025130    131400  -12.3000 -133.3300       9.2        13       207        98
WVCT   2025130    131400  -12.2200 -133.3900       8.7        16       191        89
WVCT   2025130    131400  -12.2800 -133.4800       6.0       343       215        93
WVCT   2025130    131400  -12.2800 -133.5700       6.6       342       215        85
WVCT   2025130    131400  -12.2400 -133.7200      11.2       356       211        92
WVCT   2025130    131400  -12.2200 -133.8000      11.8         5       207        99
WVCT   2025130    131400  -12.2500 -133.8700      10.4        12       203        98
WVCT   2025130    131400  -12.2400 -134.0200      10.5        21       198        98
WVCT   2025130    131400  -12.2500 -134.1200      10.4        22       189        95
WVCT   2025130    131400  -12.2300 -134.1400      10.3        22       190        98
WVCT   2025130    131400  -12.2500 -134.2500       9.3        14       195        98
WVCT   2025130    131400  -12.2300 -134.3800       9.8         8       197        99
WVCT   2025130    131400  -12.2900 -134.4300      11.9         6       201        99
WVCT   2025130    131400  -12.2700 -134.5400      11.7        15       213        99
WVCT   2025130    131400  -12.2100 -134.6800      12.1        22       224        99
WVCT   2025130    131400  -12.2500 -134.7700      12.5        20       227       100
WVCT   2025130    131400  -12.2300 -134.7900      12.7        21       227       100
WVCT   2025130    131400  -12.2700 -134.9500      13.1        11       228        91
WVCT   2025130    131400  -12.2700 -135.0100      12.3        10       216        93
WVCT   2025130    131400  -12.2900 -135.0600      11.5        14       209        97
WVCT   2025130    131400  -12.2300 -135.2300      14.5        16       204        97
WVCT   2025130    131400  -12.2900 -135.3300      15.5        19       208        96
WVCT   2025130    131400  -12.2900 -135.3800      16.7        23       208        98
WVCT   2025130    131400  -12.2800 -135.4400      16.7        23       209        96
WVCT   2025130    131400  -12.2500 -135.5700      12.2         7       210        93
WVCT   2025130    131400  -12.2800 -135.7000      10.2       351       209        94
WVCT   2025130    131400  -12.2600 -135.7900      12.1       341       206        88
WVCT   2025130    131400  -12.2800 -135.8600      13.8       349       204        98
WVCT   2025130    131400  -12.2800 -135.9600      13.8       355       200        98
WVCT   2025130    131400  -12.2500 -135.9900      12.9       355       194        92
WVCT   2025130    131400  -12.2600 -136.2400      10.2       334       210        81
WVCT   2025130    131400  -12.2600 -136.4400       9.7       339       218        64
WVCT   2025130    131400  -12.2400 -136.5300       9.6       339       220        95
WVCT   2025130    131400  -12.2100 -136.6300       5.9       322       210        94
WVCT   2025130    131400  -12.2100 -136.7200       5.7       333       206        83
WVCT   2025130    131400  -12.2400 -136.7900       5.3       351       211        61
WVCT   2025130    131400  -12.2400 -136.8700       6.1       354       210        96
WVCT   2025130    131400  -12.2000 -137.0300      12.0       348       200        82
WVCT   2025130    131400  -12.2400 -137.2500      18.2       303       205        84
WVCT   2025130    131400  -12.2000 -137.7000      10.2       278       200        70
WVCT   2025130    131400  -12.2800 -137.7700       7.5       242       201        92
WVCT   2025130    131400  -12.2000 -137.9600      14.4       121       199        68
WVCT   2025130    131400  -12.2600 -138.2900       6.4       109       218        64
WVCT   2025130    131400  -12.2800 -138.3100       8.5        97       218        65
WVCT   2025130    131400  -12.2400 -138.4800      18.8        96       219        69
WVCT   2025130    131400  -12.2600 -138.4900      18.2        95       218        75
WVCT   2025130    131400  -12.2800 -139.2100       8.4       324       216        99
WVCT   2025130    131400  -12.2600 -139.2500       9.7       324       215        99
WVCT   2025130    131400  -12.2200 -139.3600      13.9       341       208        99
WVCT   2025130    131400  -12.2000 -139.4200      14.5       343       211        99
WVCT   2025130    131400  -12.2700 -139.5600      14.0       345       220        99
WVCT   2025130    131400  -12.2200 -139.6600      14.7       347       233        99
WVCT   2025130    131400  -12.2200 -139.7100      14.7       344       235        96
WVCT   2025130    131400  -12.2200 -139.8200      15.1       349       235        97
WVCT   2025130    131400  -12.2400 -139.9200      13.3       340       234        91
WVCT   2025130    131400  -12.2000 -139.9700      13.0       335       234        96
WVCT   2025130    131400  -12.2400 -140.4900      10.3       294       228        63
WVCT   2025130    131400  -12.2200 -140.5100       9.5       297       228        63
WVCT   2025130    131400  -12.2000 -140.6000       9.7       306       226        87
WVCT   2025130    131400  -12.2700 -140.7500       7.1       341       210        88
WVCT   2025130    131400  -12.2400 -140.7800       5.5       353       199        79
WVCT   2025130    131400  -12.2000 -140.8900       5.0         2       193        74
OIR    2025130    131400   -3.4800 -134.8300       4.0       264       137        60
OIR    2025130    131400   -3.4800 -134.8400       4.0       264       137        60
OIR    2025130    131400   -3.4800 -134.8500       4.1       264       140        60
OIR    2025130    131400   -3.4800 -134.8600       4.1       264       144        60
OIR    2025130    131400   -3.4800 -134.8900       4.1       264       142        60
OIR    2025130    131400   -3.4900 -134.8300       4.0       264       143        60
OIR    2025130    131400   -3.4900 -134.8400       4.0       264       136        60
OIR    2025130    131400   -3.4900 -134.8500       4.1       264       141        60
OIR    2025130    131400   -3.4900 -134.8900       4.1       264       142        60
OIR    2025130    131400   -3.4900 -134.9000       4.1       264       139        60
OIR    2025130    131400   -3.4900 -134.9100       4.1       264       138        60
OIR    2025130    131400   -3.4900 -134.9200       4.1       264       139        60
OIR    2025130    131400   -3.4900 -134.9300       4.1       264       141        60
OIR    2025130    131400   -3.4900 -134.9400       4.2       263       141        60
OIR    2025130    131400   -3.4900 -134.9500       4.2       263       145        60
OIR    2025130    131400   -3.4900 -137.8900      24.1       135       142        60
OIR    2025130    131400   -3.4900 -137.9000      21.5       150       125        60
OIR    2025130    131400   -3.5000 -134.8400       4.0       264       128        60
OIR    2025130    131400   -3.5000 -134.8500       4.1       264       130        60
OIR    2025130    131400   -3.5000 -134.8600       4.1       264       132        60
OIR    2025130    131400   -3.5000 -134.8700       4.1       264       134        60
OIR    2025130    131400   -3.5000 -134.8800       4.1       264       134        60
OIR    2025130    131400   -3.5000 -134.8900       4.1       264       131        60
OIR    2025130    131400   -3.5000 -134.9000       4.1       264       130        60
OIR    2025130    131400   -3.5000 -134.9100       4.1       264       130        60
OIR    2025130    131400   -3.5000 -134.9200       4.1       264       130        60
OIR    2025130    131400   -3.5000 -134.9300       4.1       264       131        60
OIR    2025130    131400   -3.5000 -134.9400       4.2       263       133        60
OIR    2025130    131400   -3.5000 -134.9500       4.2       263       146        60
OIR    2025130    131400   -3.5100 -134.7400       4.0       267       145        60
OIR    2025130    131400   -3.5100 -134.7500       4.0       267       119        60
OIR    2025130    131400   -3.5100 -134.8400       4.0       264       125        60
OIR    2025130    131400   -3.5100 -134.8500       4.1       264       125        60
OIR    2025130    131400   -3.5100 -134.8600       4.1       264       126        60
OIR    2025130    131400   -3.5100 -134.8700       4.1       264       127        60
OIR    2025130    131400   -3.5100 -134.8800       4.1       264       128        60
OIR    2025130    131400   -3.5100 -134.8900       4.1       264       128        60
OIR    2025130    131400   -3.5100 -134.9000       4.1       264       128        60
OIR    2025130    131400   -3.5100 -134.9100       4.1       264       128        60
OIR    2025130    131400   -3.5100 -134.9200       4.1       264       132        60
OIR    2025130    131400   -3.5100 -134.9300       4.1       264       136        60
OIR    2025130    131400   -3.5200 -134.8400       4.1       264       135        60
OIR    2025130    131400   -3.5200 -134.8500       4.1       264       139        60
OIR    2025130    131400   -3.5200 -134.8600       4.1       264       144        60
OIR    2025130    131400   -3.5200 -134.8700       4.1       264       144        60
OIR    2025130    131400   -3.5200 -134.8800       4.1       264       145        60
OIR    2025130    131400   -3.5200 -134.9100       4.1       264       146        60
OIR    2025130    131400   -3.5300 -134.8100       4.0       265       133        60
OIR    2025130    131400   -3.5300 -134.8200       4.0       265       135        60
OIR    2025130    131400   -3.5300 -134.8300       4.0       264       138        60
OIR    2025130    131400   -3.5300 -134.8400       4.1       264       146        60
OIR    2025130    131400   -3.5400 -134.8100       4.0       265       136        60
OIR    2025130    131400   -3.5400 -134.8200       4.0       265       136        60
OIR    2025130    131400   -3.5400 -134.8300       4.1       265       142        60
OIR    2025130    131400   -3.5800 -134.5400       4.2       265       140        60
OIR    2025130    131400   -3.5800 -134.5500       4.2       265       144        60
OIR    2025130    131400   -3.5800 -134.5600       4.2       265       143        60
OIR    2025130    131400   -3.5800 -134.5700       4.2       266       141        60
OIR    2025130    131400   -3.5900 -134.5700       4.2       266       142        60
OIR    2025130    131400   -3.7800 -137.5000      27.7       130       130        60
OIR    2025130    131400   -3.8500 -137.5700      20.7       131       112        60
OIR    2025130    131400   -3.8700 -137.6100      28.1       137       125        60
OIR    2025130    131400   -4.0300 -137.7600      16.6       133       143        60
OIR    2025130    131400   -4.0300 -137.7700      16.3       130       124        60
OIR    2025130    131400   -4.5700 -136.1000      13.6        95       149        60
OIR    2025130    131400   -4.5800 -136.0900      13.7        95       151        60
OIR    2025130    131400   -4.5800 -136.1000      13.7        94       148        60
OIR    2025130    131400   -4.5900 -136.0700      13.8        96       150        60
OIR    2025130    131400   -4.5900 -136.1000      13.7        93       150        60
OIR    2025130    131400   -4.6000 -136.0700      13.7        99       150        60
OIR    2025130    131400   -5.0000 -135.2100      17.3       221       138        60
OIR    2025130    131400   -5.0000 -135.2200      15.8       241       142        60
OIR    2025130    131400   -5.0000 -135.2300      16.2       252       145        60
OIR    2025130    131400   -5.0100 -135.1800      13.7       230       143        60
OIR    2025130    131400   -5.0100 -135.2000      14.8       236       144        60
OIR    2025130    131400   -5.0100 -135.2100      15.2       239       140        60
OIR    2025130    131400   -5.0100 -135.2200      15.4       241       145        60
OIR    2025130    131400   -5.0200 -135.1700      13.0       234       134        60
OIR    2025130    131400   -5.0200 -135.1800      13.7       239       131        60
OIR    2025130    131400   -5.0200 -135.1900      14.2       239       141        60
OIR    2025130    131400   -5.0200 -135.2000      14.6       240       141        60
OIR    2025130    131400   -5.0200 -135.2100      14.9       242       143        60
OIR    2025130    131400   -5.0300 -135.1700      12.9       240       131        60
OIR    2025130    131400   -5.0300 -135.1800      13.7       241       130        60
OIR    2025130    131400   -5.0300 -135.1900      14.0       241       141        60
OIR    2025130    131400   -5.0300 -135.2000      14.3       242       143        60
OIR    2025130    131400   -5.0400 -135.1700      11.6       247       137        60
OIR    2025130    131400   -5.0400 -135.1800      13.0       244       136        60
OIR    2025130    131400   -5.0400 -135.1900      13.1       243       144        60
OIR    2025130    131400   -5.3200 -137.6700       9.5        59       148        60
OIR    2025130    131400   -5.3200 -137.6800       9.5        59       148        60
OIR    2025130    131400   -5.3200 -137.6900       9.4        59       148        60
OIR    2025130    131400   -5.3300 -137.6700       9.5        59       149        60
OIR    2025130    131400   -5.3300 -137.6800       9.5        59       148        60
OIR    2025130    131400   -5.3500 -138.7200       9.3        80       147        60
OIR    2025130    131400   -5.3500 -138.7300       9.3        80       147        60
OIR    2025130    131400   -5.3600 -137.7100       9.4        59       147        60
OIR    2025130    131400   -5.3600 -137.7200       9.4        59       149        60
OIR    2025130    131400   -5.3600 -138.7100       9.3        80       146        60
OIR    2025130    131400   -5.3600 -138.7200       9.3        80       143        60
OIR    2025130    131400   -5.3600 -138.7300       9.4        80       141        60
OIR    2025130    131400   -5.3600 -138.7400       9.4        80       141        60
OIR    2025130    131400   -5.3600 -138.7500       9.4        80       142        60
OIR    2025130    131400   -5.3600 -138.7600       9.4        80       142        60
OIR    2025130    131400   -5.3600 -138.7700       9.4        80       142        60
OIR    2025130    131400   -5.3600 -138.7800       9.4        80       143        60
OIR    2025130    131400   -5.3600 -138.7900       9.5        80       148        60
OIR    2025130    131400   -5.3600 -138.8100       9.5        80       147        60
OIR    2025130    131400   -5.3600 -138.8200       9.5        80       146        60
OIR    2025130    131400   -5.3600 -138.8300       9.5        80       145        60
OIR    2025130    131400   -5.3600 -138.8400       9.5        80       146        60
OIR    2025130    131400   -5.3600 -138.8500       9.6        80       148        60
OIR    2025130    131400   -5.3700 -138.6300       9.2        80       147        60
OIR    2025130    131400   -5.3700 -138.6400       9.2        80       147        60
OIR    2025130    131400   -5.3700 -138.6500       9.2        80       146        60
OIR    2025130    131400   -5.3700 -138.6600       9.3        80       146        60
OIR    2025130    131400   -5.3700 -138.6700       9.3        80       147        60
OIR    2025130    131400   -5.3700 -138.7000       9.3        80       146        60
OIR    2025130    131400   -5.3700 -138.7100       9.3        80       145        60
OIR    2025130    131400   -5.3700 -138.7200       9.4        80       145        60
OIR    2025130    131400   -5.3700 -138.7300       9.4        80       143        60
OIR    2025130    131400   -5.3700 -138.7400       9.4        80       139        60
OIR    2025130    131400   -5.3700 -138.7500       9.4        80       140        60
OIR    2025130    131400   -5.3700 -138.7600       9.4        80       140        60
OIR    2025130    131400   -5.3700 -138.7700       9.4        80       139        60
OIR    2025130    131400   -5.3700 -138.7800       9.4        80       139        60
OIR    2025130    131400   -5.3700 -138.7900       9.5        80       144        60
OIR    2025130    131400   -5.3700 -138.8000       9.5        80       146        60
OIR    2025130    131400   -5.3700 -138.8100       9.5        80       144        60
OIR    2025130    131400   -5.3700 -138.8200       9.5        80       145        60
OIR    2025130    131400   -5.3700 -138.8300       9.5        80       146        60
OIR    2025130    131400   -5.3700 -138.8400       9.5        80       148        60
OIR    2025130    131400   -5.3800 -138.5800       9.2        81       147        60
OIR    2025130    131400   -5.3800 -138.5900       9.1        81       146        60
OIR    2025130    131400   -5.3800 -138.6000       9.1        80       145        60
OIR    2025130    131400   -5.3800 -138.6200       9.2        80       147        60
OIR    2025130    131400   -5.3800 -138.6300       9.2        80       145        60
OIR    2025130    131400   -5.3800 -138.6400       9.2        80       144        60
OIR    2025130    131400   -5.3800 -138.6500       9.3        80       143        60
OIR    2025130    131400   -5.3800 -138.6600       9.3        80       143        60
OIR    2025130    131400   -5.3800 -138.6700       9.3        80       144        60
OIR    2025130    131400   -5.3800 -138.6800       9.3        80       146        60
OIR    2025130    131400   -5.3800 -138.6900       9.3        80       146        60
OIR    2025130    131400   -5.3800 -138.7000       9.3        80       144        60
OIR    2025130    131400   -5.3800 -138.7100       9.4        80       144        60
OIR    2025130    131400   -5.3800 -138.7200       9.4        80       145        60
OIR    2025130    131400   -5.3800 -138.7300       9.4        80       142        60
OIR    2025130    131400   -5.3800 -138.7400       9.4        80       138        60
OIR    2025130    131400   -5.3800 -138.7500       9.4        80       138        60
OIR    2025130    131400   -5.3800 -138.7600       9.4        80       138        60
OIR    2025130    131400   -5.3800 -138.7700       9.4        80       137        60
OIR    2025130    131400   -5.3800 -138.7800       9.5        80       137        60
OIR    2025130    131400   -5.3800 -138.7900       9.5        80       140        60
OIR    2025130    131400   -5.3800 -138.8000       9.5        80       142        60
OIR    2025130    131400   -5.3800 -138.8100       9.5        80       141        60
OIR    2025130    131400   -5.3800 -138.8200       9.5        80       143        60
OIR    2025130    131400   -5.3800 -138.8300       9.5        80       144        60
OIR    2025130    131400   -5.3800 -138.8400       9.5        80       146        60
OIR    2025130    131400   -5.3900 -138.5000      10.3        89       148        60
OIR    2025130    131400   -5.3900 -138.5100       9.9        87       147        60
OIR    2025130    131400   -5.3900 -138.5200       9.5        84       147        60
OIR    2025130    131400   -5.3900 -138.5300       9.3        83       147        60
OIR    2025130    131400   -5.3900 -138.5400       9.3        82       147        60
OIR    2025130    131400   -5.3900 -138.5500       9.2        82       147        60
OIR    2025130    131400   -5.3900 -138.5600       9.2        82       147        60
OIR    2025130    131400   -5.3900 -138.5700       9.2        81       146        60
OIR    2025130    131400   -5.3900 -138.5800       9.2        81       145        60
OIR    2025130    131400   -5.3900 -138.5900       9.1        81       144        60
OIR    2025130    131400   -5.3900 -138.6000       9.2        81       144        60
OIR    2025130    131400   -5.3900 -138.6100       9.2        80       145        60
OIR    2025130    131400   -5.3900 -138.6200       9.2        80       144        60
OIR    2025130    131400   -5.3900 -138.6300       9.2        80       142        60
OIR    2025130    131400   -5.3900 -138.6400       9.2        80       140        60
OIR    2025130    131400   -5.3900 -138.6500       9.3        80       139        60
OIR    2025130    131400   -5.3900 -138.6600       9.3        80       140        60
OIR    2025130    131400   -5.3900 -138.6700       9.3        80       141        60
OIR    2025130    131400   -5.3900 -138.6800       9.4        80       144        60
OIR    2025130    131400   -5.3900 -138.6900       9.3        80       144        60
OIR    2025130    131400   -5.3900 -138.7000       9.4        80       142        60
OIR    2025130    131400   -5.3900 -138.7100       9.4        80       141        60
OIR    2025130    131400   -5.3900 -138.7200       9.4        80       141        60
OIR    2025130    131400   -5.3900 -138.7300       9.4        80       139        60
OIR    2025130    131400   -5.3900 -138.7400       9.4        80       137        60
OIR    2025130    131400   -5.3900 -138.7500       9.4        80       135        60
OIR    2025130    131400   -5.3900 -138.7600       9.4        80       135        60
OIR    2025130    131400   -5.3900 -138.7700       9.5        80       135        60
OIR    2025130    131400   -5.3900 -138.7800       9.5        80       135        60
OIR    2025130    131400   -5.3900 -138.7900       9.5        80       136        60
OIR    2025130    131400   -5.3900 -138.8000       9.5        80       137        60
OIR    2025130    131400   -5.3900 -138.8100       9.5        81       138        60
OIR    2025130    131400   -5.3900 -138.8200       9.5        81       138        60
OIR    2025130    131400   -5.3900 -138.8300       9.5        81       139        60
OIR    2025130    131400   -5.3900 -138.8400       9.5        81       140        60
OIR    2025130    131400   -5.3900 -138.8500       9.5        81       142        60
OIR    2025130    131400   -5.3900 -138.8600       9.5        81       143        60
OIR    2025130    131400   -5.3900 -138.8700       9.5        81       145        60
OIR    2025130    131400   -5.3900 -138.8800       9.5        81       148        60
OIR    2025130    131400   -5.4000 -137.6900      11.1        60       147        60
OIR    2025130    131400   -5.4000 -138.5000      10.5        90       145        60
OIR    2025130    131400   -5.4000 -138.5100      10.1        87       145        60
OIR    2025130    131400   -5.4000 -138.5200       9.7        84       145        60
OIR    2025130    131400   -5.4000 -138.5300       9.4        83       145        60
OIR    2025130    131400   -5.4000 -138.5400       9.3        82       145        60
OIR    2025130    131400   -5.4000 -138.5500       9.2        82       146        60
OIR    2025130    131400   -5.4000 -138.5600       9.2        82       146        60
OIR    2025130    131400   -5.4000 -138.5700       9.2        81       145        60
OIR    2025130    131400   -5.4000 -138.5800       9.2        81       143        60
OIR    2025130    131400   -5.4000 -138.5900       9.1        81       142        60
OIR    2025130    131400   -5.4000 -138.6000       9.1        81       142        60
OIR    2025130    131400   -5.4000 -138.6100       9.2        81       143        60
OIR    2025130    131400   -5.4000 -138.6200       9.2        80       142        60
OIR    2025130    131400   -5.4000 -138.6300       9.2        80       140        60
OIR    2025130    131400   -5.4000 -138.6400       9.3        80       138        60
OIR    2025130    131400   -5.4000 -138.6500       9.3        80       136        60
OIR    2025130    131400   -5.4000 -138.6600       9.3        80       137        60
OIR    2025130    131400   -5.4000 -138.6700       9.4        80       139        60
OIR    2025130    131400   -5.4000 -138.6800       9.4        80       141        60
OIR    2025130    131400   -5.4000 -138.6900       9.4        80       142        60
OIR    2025130    131400   -5.4000 -138.7000       9.4        80       141        60
OIR    2025130    131400   -5.4000 -138.7100       9.4        80       140        60
OIR    2025130    131400   -5.4000 -138.7200       9.4        80       139        60
OIR    2025130    131400   -5.4000 -138.7300       9.4        80       138        60
OIR    2025130    131400   -5.4000 -138.7400       9.4        80       137        60
OIR    2025130    131400   -5.4000 -138.7500       9.4        80       135        60
OIR    2025130    131400   -5.4000 -138.7600       9.5        80       134        60
OIR    2025130    131400   -5.4000 -138.7700       9.5        80       135        60
OIR    2025130    131400   -5.4000 -138.7800       9.5        80       135        60
OIR    2025130    131400   -5.4000 -138.7900       9.5        80       134        60
OIR    2025130    131400   -5.4000 -138.8000       9.5        81       134        60
OIR    2025130    131400   -5.4000 -138.8100       9.5        81       136        60
OIR    2025130    131400   -5.4000 -138.8200       9.5        81       136        60
OIR    2025130    131400   -5.4000 -138.8300       9.5        81       137        60
OIR    2025130    131400   -5.4000 -138.8400       9.5        81       137        60
OIR    2025130    131400   -5.4000 -138.8500       9.5        81       138        60
OIR    2025130    131400   -5.4000 -138.8600       9.5        81       140        60
OIR    2025130    131400   -5.4000 -138.8700       9.5        81       143        60
OIR    2025130    131400   -5.4100 -138.4900      11.1        94       145        60
OIR    2025130    131400   -5.4100 -138.5000      10.6        90       143        60
OIR    2025130    131400   -5.4100 -138.5100      10.1        88       143        60
OIR    2025130    131400   -5.4100 -138.5200       9.8        85       143        60
OIR    2025130    131400   -5.4100 -138.5300       9.5        83       144        60
OIR    2025130    131400   -5.4100 -138.5400       9.3        82       144        60
OIR    2025130    131400   -5.4100 -138.5500       9.3        82       145        60
OIR    2025130    131400   -5.4100 -138.5600       9.2        82       146        60
OIR    2025130    131400   -5.4100 -138.5700       9.2        81       143        60
OIR    2025130    131400   -5.4100 -138.5800       9.1        81       141        60
OIR    2025130    131400   -5.4100 -138.5900       9.1        81       140        60
OIR    2025130    131400   -5.4100 -138.6000       9.1        81       140        60
OIR    2025130    131400   -5.4100 -138.6100       9.2        81       141        60
OIR    2025130    131400   -5.4100 -138.6200       9.2        81       140        60
OIR    2025130    131400   -5.4100 -138.6300       9.2        80       138        60
OIR    2025130    131400   -5.4100 -138.6400       9.3        80       136        60
OIR    2025130    131400   -5.4100 -138.6500       9.3        80       135        60
OIR    2025130    131400   -5.4100 -138.6600       9.3        80       136        60
OIR    2025130    131400   -5.4100 -138.6700       9.4        80       137        60
OIR    2025130    131400   -5.4100 -138.6800       9.4        80       139        60
OIR    2025130    131400   -5.4100 -138.6900       9.4        80       140        60
OIR    2025130    131400   -5.4100 -138.7000       9.4        80       140        60
OIR    2025130    131400   -5.4100 -138.7100       9.4        80       139        60
OIR    2025130    131400   -5.4100 -138.7200       9.4        80       139        60
OIR    2025130    131400   -5.4100 -138.7300       9.4        80       138        60
OIR    2025130    131400   -5.4100 -138.7400       9.4        80       137        60
OIR    2025130    131400   -5.4100 -138.7500       9.4        80       136        60
OIR    2025130    131400   -5.4100 -138.7600       9.5        80       135        60
OIR    2025130    131400   -5.4100 -138.7700       9.5        80       135        60
OIR    2025130    131400   -5.4100 -138.7800       9.5        81       135        60
OIR    2025130    131400   -5.4100 -138.7900       9.5        81       134        60
OIR    2025130    131400   -5.4100 -138.8000       9.5        81       134        60
OIR    2025130    131400   -5.4100 -138.8100       9.5        81       135        60
OIR    2025130    131400   -5.4100 -138.8200       9.5        81       136        60
OIR    2025130    131400   -5.4100 -138.8300       9.5        81       136        60
OIR    2025130    131400   -5.4100 -138.8400       9.5        81       137        60
OIR    2025130    131400   -5.4100 -138.8500       9.5        81       138        60
OIR    2025130    131400   -5.4100 -138.8600       9.5        81       141        60
OIR    2025130    131400   -5.4100 -138.8700       9.5        81       145        60
OIR    2025130    131400   -5.4200 -138.4800      11.5        97       146        60
OIR    2025130    131400   -5.4200 -138.4900      11.2        95       141        60
OIR    2025130    131400   -5.4200 -138.5000      10.6        91       141        60
OIR    2025130    131400   -5.4200 -138.5100      10.1        88       141        60
OIR    2025130    131400   -5.4200 -138.5200       9.9        86       141        60
OIR    2025130    131400   -5.4200 -138.5300       9.5        83       142        60
OIR    2025130    131400   -5.4200 -138.5400       9.3        82       144        60
OIR    2025130    131400   -5.4200 -138.5500       9.3        82       145        60
OIR    2025130    131400   -5.4200 -138.5600       9.2        82       146        60
OIR    2025130    131400   -5.4200 -138.5700       9.1        82       142        60
OIR    2025130    131400   -5.4200 -138.5800       9.1        81       140        60
OIR    2025130    131400   -5.4200 -138.5900       9.1        81       140        60
OIR    2025130    131400   -5.4200 -138.6000       9.1        81       139        60
OIR    2025130    131400   -5.4200 -138.6100       9.2        81       140        60
OIR    2025130    131400   -5.4200 -138.6200       9.2        81       139        60
OIR    2025130    131400   -5.4200 -138.6300       9.2        81       137        60
OIR    2025130    131400   -5.4200 -138.6400       9.3        80       135        60
OIR    2025130    131400   -5.4200 -138.6500       9.3        80       134        60
OIR    2025130    131400   -5.4200 -138.6600       9.4        80       134        60
OIR    2025130    131400   -5.4200 -138.6700       9.4        80       135        60
OIR    2025130    131400   -5.4200 -138.6800       9.4        80       137        60
OIR    2025130    131400   -5.4200 -138.6900       9.4        80       138        60
OIR    2025130    131400   -5.4200 -138.7000       9.4        80       138        60
OIR    2025130    131400   -5.4200 -138.7100       9.4        80       138        60
OIR    2025130    131400   -5.4200 -138.7200       9.4        80       137        60
OIR    2025130    131400   -5.4200 -138.7300       9.4        80       136        60
OIR    2025130    131400   -5.4200 -138.7400       9.5        80       136        60
OIR    2025130    131400   -5.4200 -138.7500       9.5        80       135        60
OIR    2025130    131400   -5.4200 -138.7600       9.5        81       134        60
OIR    2025130    131400   -5.4200 -138.7700       9.5        81       134        60
OIR    2025130    131400   -5.4200 -138.7800       9.5        81       134        60
OIR    2025130    131400   -5.4200 -138.7900       9.5        81       133        60
OIR    2025130    131400   -5.4200 -138.8000       9.5        81       133        60
OIR    2025130    131400   -5.4200 -138.8100       9.5        81       134        60
OIR    2025130    131400   -5.4200 -138.8200       9.5        81       135        60
OIR    2025130    131400   -5.4200 -138.8300       9.5        81       135        60
OIR    2025130    131400   -5.4200 -138.8400       9.5        81       136        60
OIR    2025130    131400   -5.4200 -138.8500       9.5        81       137        60
OIR    2025130    131400   -5.4200 -138.8600       9.5        81       139        60
OIR    2025130    131400   -5.4200 -138.8700       9.5        81       144        60
OIR    2025130    131400   -5.4300 -138.2200      12.5        99       143        60
OIR    2025130    131400   -5.4300 -138.2300      12.5       100       140        60
OIR    2025130    131400   -5.4300 -138.2400      12.5       103       140        60
OIR    2025130    131400   -5.4300 -138.2500      12.7       108       141        60
OIR    2025130    131400   -5.4300 -138.2600      13.1       116       145        60
OIR    2025130    131400   -5.4300 -138.2900      15.0       128       148        60
OIR    2025130    131400   -5.4300 -138.4700      11.5       101       146        60
OIR    2025130    131400   -5.4300 -138.4800      11.4        98       141        60
OIR    2025130    131400   -5.4300 -138.4900      11.1        96       137        60
OIR    2025130    131400   -5.4300 -138.5000      10.5        92       138        60
OIR    2025130    131400   -5.4300 -138.5100      10.1        88       138        60
OIR    2025130    131400   -5.4300 -138.5200       9.9        86       138        60
OIR    2025130    131400   -5.4300 -138.5300       9.4        83       140        60
OIR    2025130    131400   -5.4300 -138.5400       9.3        82       143        60
OIR    2025130    131400   -5.4300 -138.5500       9.3        82       145        60
OIR    2025130    131400   -5.4300 -138.5600       9.2        82       145        60
OIR    2025130    131400   -5.4300 -138.5700       9.1        82       142        60
OIR    2025130    131400   -5.4300 -138.5800       9.1        82       141        60
OIR    2025130    131400   -5.4300 -138.5900       9.1        82       141        60
OIR    2025130    131400   -5.4300 -138.6000       9.1        81       140        60
OIR    2025130    131400   -5.4300 -138.6100       9.2        81       139        60
OIR    2025130    131400   -5.4300 -138.6200       9.2        81       138        60
OIR    2025130    131400   -5.4300 -138.6300       9.2        81       136        60
OIR    2025130    131400   -5.4300 -138.6400       9.3        81       135        60
OIR    2025130    131400   -5.4300 -138.6500       9.4        80       134        60
OIR    2025130    131400   -5.4300 -138.6600       9.4        80       133        60
OIR    2025130    131400   -5.4300 -138.6700       9.4        80       133        60
OIR    2025130    131400   -5.4300 -138.6800       9.4        80       133        60
OIR    2025130    131400   -5.4300 -138.6900       9.4        80       134        60
OIR    2025130    131400   -5.4300 -138.7000       9.4        80       136        60
OIR    2025130    131400   -5.4300 -138.7100       9.4        80       136        60
OIR    2025130    131400   -5.4300 -138.7200       9.4        80       134        60
OIR    2025130    131400   -5.4300 -138.7300       9.5        80       134        60
OIR    2025130    131400   -5.4300 -138.7400       9.5        80       133        60
OIR    2025130    131400   -5.4300 -138.7500       9.5        80       133        60
OIR    2025130    131400   -5.4300 -138.7600       9.5        81       133        60
OIR    2025130    131400   -5.4300 -138.7700       9.5        81       132        60
OIR    2025130    131400   -5.4300 -138.7800       9.5        81       132        60
OIR    2025130    131400   -5.4300 -138.7900       9.5        81       132        60
OIR    2025130    131400   -5.4300 -138.8000       9.5        81       132        60
OIR    2025130    131400   -5.4300 -138.8100       9.5        81       133        60
OIR    2025130    131400   -5.4300 -138.8200       9.5        81       133        60
OIR    2025130    131400   -5.4300 -138.8300       9.5        81       133        60
OIR    2025130    131400   -5.4300 -138.8400       9.5        81       135        60
OIR    2025130    131400   -5.4300 -138.8500       9.5        81       136        60
OIR    2025130    131400   -5.4300 -138.8600       9.5        81       137        60
OIR    2025130    131400   -5.4300 -138.8700       9.5        81       141        60
OIR    2025130    131400   -5.4400 -138.2000      12.9        96       146        60
OIR    2025130    131400   -5.4400 -138.2100      12.7        97       142        60
OIR    2025130    131400   -5.4400 -138.2200      12.8        97       138        60
OIR    2025130    131400   -5.4400 -138.2300      12.8        98       138        60
OIR    2025130    131400   -5.4400 -138.2400      12.8       102       137        60
OIR    2025130    131400   -5.4400 -138.2500      13.1       111       137        60
OIR    2025130    131400   -5.4400 -138.2600      13.9       121       140        60
OIR    2025130    131400   -5.4400 -138.2700      14.6       126       142        60
OIR    2025130    131400   -5.4400 -138.2800      14.8       128       140        60
OIR    2025130    131400   -5.4400 -138.2900      15.0       129       139        60
OIR    2025130    131400   -5.4400 -138.3000      15.6       132       143        60
OIR    2025130    131400   -5.4400 -138.3100      16.1       135       145        60
OIR    2025130    131400   -5.4400 -138.3200      16.3       136       145        60
OIR    2025130    131400   -5.4400 -138.3300      16.3       136       144        60
OIR    2025130    131400   -5.4400 -138.3400      16.2       135       143        60
OIR    2025130    131400   -5.4400 -138.3500      15.3       135       143        60
OIR    2025130    131400   -5.4400 -138.3600      13.9       136       144        60
OIR    2025130    131400   -5.4400 -138.4600      11.3       105       147        60
OIR    2025130    131400   -5.4400 -138.4700      11.3       102       142        60
OIR    2025130    131400   -5.4400 -138.4800      11.2        99       138        60
OIR    2025130    131400   -5.4400 -138.4900      10.8        95       135        60
OIR    2025130    131400   -5.4400 -138.5000      10.3        91       135        60
OIR    2025130    131400   -5.4400 -138.5100      10.0        88       135        60
OIR    2025130    131400   -5.4400 -138.5200       9.8        87       136        60
OIR    2025130    131400   -5.4400 -138.5300       9.3        83       138        60
OIR    2025130    131400   -5.4400 -138.5400       9.3        83       142        60
OIR    2025130    131400   -5.4400 -138.5500       9.2        82       144        60
OIR    2025130    131400   -5.4400 -138.5600       9.1        82       145        60
OIR    2025130    131400   -5.4400 -138.5700       9.1        82       143        60
OIR    2025130    131400   -5.4400 -138.5800       9.1        82       143        60
OIR    2025130    131400   -5.4400 -138.5900       9.1        82       144        60
OIR    2025130    131400   -5.4400 -138.6000       9.1        81       144        60
OIR    2025130    131400   -5.4400 -138.6100       9.2        81       141        60
OIR    2025130    131400   -5.4400 -138.6200       9.2        81       140        60
OIR    2025130    131400   -5.4400 -138.6300       9.2        81       138        60
OIR    2025130    131400   -5.4400 -138.6400       9.3        81       136        60
OIR    2025130    131400   -5.4400 -138.6500       9.4        80       135        60
OIR    2025130    131400   -5.4400 -138.6600       9.4        80       133        60
OIR    2025130    131400   -5.4400 -138.6700       9.4        80       132        60
OIR    2025130    131400   -5.4400 -138.6800       9.4        80       133        60
OIR    2025130    131400   -5.4400 -138.6900       9.4        80       134        60
OIR    2025130    131400   -5.4400 -138.7000       9.4        80       135        60
OIR    2025130    131400   -5.4400 -138.7100       9.4        80       135        60
OIR    2025130    131400   -5.4400 -138.7200       9.5        80       134        60
OIR    2025130    131400   -5.4400 -138.7300       9.5        80       133        60
OIR    2025130    131400   -5.4400 -138.7400       9.5        80       132        60
OIR    2025130    131400   -5.4400 -138.7500       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.7600       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.7700       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.7800       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.7900       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.8000       9.5        81       132        60
OIR    2025130    131400   -5.4400 -138.8100       9.5        81       133        60
OIR    2025130    131400   -5.4400 -138.8200       9.5        81       133        60
OIR    2025130    131400   -5.4400 -138.8300       9.5        81       134        60
OIR    2025130    131400   -5.4400 -138.8400       9.5        81       134        60
OIR    2025130    131400   -5.4400 -138.8500       9.5        81       134        60
OIR    2025130    131400   -5.4400 -138.8600       9.5        81       137        60
OIR    2025130    131400   -5.4400 -138.8700       9.5        82       142        60
OIR    2025130    131400   -5.4500 -138.1900      13.3        95       144        60
OIR    2025130    131400   -5.4500 -138.2000      13.1        95       139        60
OIR    2025130    131400   -5.4500 -138.2100      12.9        96       136        60
OIR    2025130    131400   -5.4500 -138.2200      13.0        96       134        60
OIR    2025130    131400   -5.4500 -138.2300      13.0        97       135        60
OIR    2025130    131400   -5.4500 -138.2400      12.9       102       135        60
OIR    2025130    131400   -5.4500 -138.2500      13.4       113       133        60
OIR    2025130    131400   -5.4500 -138.2600      14.2       123       134        60
OIR    2025130    131400   -5.4500 -138.2700      14.7       127       135        60
OIR    2025130    131400   -5.4500 -138.2800      14.9       128       133        60
OIR    2025130    131400   -5.4500 -138.2900      15.0       129       132        60
OIR    2025130    131400   -5.4500 -138.3000      15.6       132       135        60
OIR    2025130    131400   -5.4500 -138.3100      16.2       135       136        60
OIR    2025130    131400   -5.4500 -138.3200      16.3       136       136        60
OIR    2025130    131400   -5.4500 -138.3300      16.3       136       135        60
OIR    2025130    131400   -5.4500 -138.3400      16.3       136       134        60
OIR    2025130    131400   -5.4500 -138.3500      15.8       136       135        60
OIR    2025130    131400   -5.4500 -138.3600      14.7       138       136        60
OIR    2025130    131400   -5.4500 -138.3700      14.1       142       139        60
OIR    2025130    131400   -5.4500 -138.3800      13.4       142       142        60
OIR    2025130    131400   -5.4500 -138.3900      12.9       142       147        60
OIR    2025130    131400   -5.4500 -138.4200      10.1       135       148        60
OIR    2025130    131400   -5.4500 -138.4300       9.5       128       147        60
OIR    2025130    131400   -5.4500 -138.4400       9.9       123       145        60
OIR    2025130    131400   -5.4500 -138.4500      10.3       115       142        60
OIR    2025130    131400   -5.4500 -138.4600      10.7       108       140        60
OIR    2025130    131400   -5.4500 -138.4700      10.8       104       138        60
OIR    2025130    131400   -5.4500 -138.4800      10.7       100       135        60
OIR    2025130    131400   -5.4500 -138.4900      10.3        94       133        60
OIR    2025130    131400   -5.4500 -138.5000      10.0        90       132        60
OIR    2025130    131400   -5.4500 -138.5100       9.8        88       133        60
OIR    2025130    131400   -5.4500 -138.5200       9.7        86       133        60
OIR    2025130    131400   -5.4500 -138.5300       9.3        83       136        60
OIR    2025130    131400   -5.4500 -138.5400       9.2        83       141        60
OIR    2025130    131400   -5.4500 -138.5500       9.1        82       143        60
OIR    2025130    131400   -5.4500 -138.5600       9.1        82       145        60
OIR    2025130    131400   -5.4500 -138.5700       9.1        82       144        60
OIR    2025130    131400   -5.4500 -138.5800       9.1        82       145        60
OIR    2025130    131400   -5.4500 -138.5900       9.1        82       146        60
OIR    2025130    131400   -5.4500 -138.6000       9.1        81       147        60
OIR    2025130    131400   -5.4500 -138.6100       9.2        81       144        60
OIR    2025130    131400   -5.4500 -138.6200       9.2        81       142        60
OIR    2025130    131400   -5.4500 -138.6300       9.2        81       140        60
OIR    2025130    131400   -5.4500 -138.6400       9.3        81       138        60
OIR    2025130    131400   -5.4500 -138.6500       9.4        81       135        60
OIR    2025130    131400   -5.4500 -138.6600       9.4        80       133        60
OIR    2025130    131400   -5.4500 -138.6700       9.4        80       132        60
OIR    2025130    131400   -5.4500 -138.6800       9.4        80       133        60
OIR    2025130    131400   -5.4500 -138.6900       9.4        80       134        60
OIR    2025130    131400   -5.4500 -138.7000       9.5        80       135        60
OIR    2025130    131400   -5.4500 -138.7100       9.5        80       134        60
OIR    2025130    131400   -5.4500 -138.7200       9.5        80       133        60
OIR    2025130    131400   -5.4500 -138.7300       9.5        80       132        60
OIR    2025130    131400   -5.4500 -138.7400       9.5        80       132        60
OIR    2025130    131400   -5.4500 -138.7500       9.5        81       132        60
OIR    2025130    131400   -5.4500 -138.7600       9.5        81       131        60
OIR    2025130    131400   -5.4500 -138.7700       9.5        81       131        60
OIR    2025130    131400   -5.4500 -138.7800       9.5        81       132        60
OIR    2025130    131400   -5.4500 -138.7900       9.5        81       132        60
OIR    2025130    131400   -5.4500 -138.8000       9.5        81       132        60
OIR    2025130    131400   -5.4500 -138.8100       9.5        81       133        60
OIR    2025130    131400   -5.4500 -138.8200       9.5        81       134        60
OIR    2025130    131400   -5.4500 -138.8300       9.5        81       134        60
OIR    2025130    131400   -5.4500 -138.8400       9.5        81       133        60
OIR    2025130    131400   -5.4500 -138.8500       9.5        81       133        60
OIR    2025130    131400   -5.4500 -138.8600       9.5        81       137        60
OIR    2025130    131400   -5.4500 -138.8700       9.5        82       143        60
OIR    2025130    131400   -5.4600 -138.1600      13.4        93       147        60
OIR    2025130    131400   -5.4600 -138.1700      13.4        94       145        60
OIR    2025130    131400   -5.4600 -138.1800      13.4        94       143        60
OIR    2025130    131400   -5.4600 -138.1900      13.3        95       138        60
OIR    2025130    131400   -5.4600 -138.2000      13.3        95       136        60
OIR    2025130    131400   -5.4600 -138.2100      13.1        95       135        60
OIR    2025130    131400   -5.4600 -138.2200      13.0        95       134        60
OIR    2025130    131400   -5.4600 -138.2300      13.0        96       134        60
OIR    2025130    131400   -5.4600 -138.2400      12.9       100       133        60
OIR    2025130    131400   -5.4600 -138.2500      13.2       111       133        60
OIR    2025130    131400   -5.4600 -138.2600      14.0       122       133        60
OIR    2025130    131400   -5.4600 -138.2700      14.6       126       133        60
OIR    2025130    131400   -5.4600 -138.2800      14.7       127       132        60
OIR    2025130    131400   -5.4600 -138.2900      14.9       128       131        60
OIR    2025130    131400   -5.4600 -138.3000      15.4       131       133        60
OIR    2025130    131400   -5.4600 -138.3100      16.1       134       133        60
OIR    2025130    131400   -5.4600 -138.3200      16.3       136       132        60
OIR    2025130    131400   -5.4600 -138.3300      16.3       136       131        60
OIR    2025130    131400   -5.4600 -138.3400      16.3       136       130        60
OIR    2025130    131400   -5.4600 -138.3500      16.0       137       129        60
OIR    2025130    131400   -5.4600 -138.3600      15.2       140       129        60
OIR    2025130    131400   -5.4600 -138.3700      14.4       144       131        60
OIR    2025130    131400   -5.4600 -138.3800      13.7       145       134        60
OIR    2025130    131400   -5.4600 -138.3900      13.0       145       137        60
OIR    2025130    131400   -5.4600 -138.4000      12.2       144       140        60
OIR    2025130    131400   -5.4600 -138.4100      10.9       143       142        60
OIR    2025130    131400   -5.4600 -138.4200       9.3       142       144        60
OIR    2025130    131400   -5.4600 -138.4300       8.3       136       144        60
OIR    2025130    131400   -5.4600 -138.4400       8.1       129       141        60
OIR    2025130    131400   -5.4600 -138.4500       8.6       122       139        60
OIR    2025130    131400   -5.4600 -138.4600       9.2       113       137        60
OIR    2025130    131400   -5.4600 -138.4700       9.7       107       136        60
OIR    2025130    131400   -5.4600 -138.4800       9.7       100       133        60
OIR    2025130    131400   -5.4600 -138.4900       9.7        94       131        60
OIR    2025130    131400   -5.4600 -138.5000       9.7        90       131        60
OIR    2025130    131400   -5.4600 -138.5100       9.6        87       132        60
OIR    2025130    131400   -5.4600 -138.5200       9.4        85       133        60
OIR    2025130    131400   -5.4600 -138.5300       9.2        83       136        60
OIR    2025130    131400   -5.4600 -138.5400       9.1        83       140        60
OIR    2025130    131400   -5.4600 -138.5500       9.1        82       144        60
OIR    2025130    131400   -5.4600 -138.5600       9.0        82       146        60
OIR    2025130    131400   -5.4600 -138.5700       9.0        82       145        60
OIR    2025130    131400   -5.4600 -138.5800       9.1        82       146        60
OIR    2025130    131400   -5.4600 -138.5900       9.1        82       146        60
OIR    2025130    131400   -5.4600 -138.6000       9.1        82       147        60
OIR    2025130    131400   -5.4600 -138.6100       9.2        81       146        60
OIR    2025130    131400   -5.4600 -138.6200       9.2        81       144        60
OIR    2025130    131400   -5.4600 -138.6300       9.3        81       140        60
OIR    2025130    131400   -5.4600 -138.6400       9.3        81       139        60
OIR    2025130    131400   -5.4600 -138.6500       9.4        81       137        60
OIR    2025130    131400   -5.4600 -138.6600       9.4        80       136        60
OIR    2025130    131400   -5.4600 -138.6700       9.4        80       134        60
OIR    2025130    131400   -5.4600 -138.6800       9.5        80       134        60
OIR    2025130    131400   -5.4600 -138.6900       9.5        80       134        60
OIR    2025130    131400   -5.4600 -138.7000       9.5        80       134        60
OIR    2025130    131400   -5.4600 -138.7100       9.5        80       133        60
OIR    2025130    131400   -5.4600 -138.7200       9.5        80       132        60
OIR    2025130    131400   -5.4600 -138.7300       9.5        80       131        60
OIR    2025130    131400   -5.4600 -138.7400       9.5        81       131        60
OIR    2025130    131400   -5.4600 -138.7500       9.5        81       131        60
OIR    2025130    131400   -5.4600 -138.7600       9.5        81       131        60
OIR    2025130    131400   -5.4600 -138.7700       9.5        81       132        60
OIR    2025130    131400   -5.4600 -138.7800       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.7900       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.8000       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.8300       9.6        81       133        60
OIR    2025130    131400   -5.4600 -138.8400       9.5        81       133        60
OIR    2025130    131400   -5.4600 -138.8500       9.5        81       133        60
OIR    2025130    131400   -5.4600 -138.8600       9.5        81       136        60
OIR    2025130    131400   -5.4600 -138.8700       9.5        82       140        60
OIR    2025130    131400   -5.4600 -138.8800       9.4        83       147        60
OIR    2025130    131400   -5.4700 -138.1400      13.7        89       145        60
OIR    2025130    131400   -5.4700 -138.1500      13.5        90       143        60
OIR    2025130    131400   -5.4700 -138.1600      13.5        93       142        60
OIR    2025130    131400   -5.4700 -138.1700      13.4        94       139        60
OIR    2025130    131400   -5.4700 -138.1800      13.4        94       137        60
OIR    2025130    131400   -5.4700 -138.1900      13.3        95       134        60
OIR    2025130    131400   -5.4700 -138.2000      13.3        95       132        60
OIR    2025130    131400   -5.4700 -138.2100      13.2        94       133        60
OIR    2025130    131400   -5.4700 -138.2200      13.1        95       133        60
OIR    2025130    131400   -5.4700 -138.2300      13.0        95       132        60
OIR    2025130    131400   -5.4700 -138.2400      13.0        97       132        60
OIR    2025130    131400   -5.4700 -138.2500      13.0       105       132        60
OIR    2025130    131400   -5.4700 -138.2600      13.6       116       132        60
OIR    2025130    131400   -5.4700 -138.2700      14.1       123       131        60
OIR    2025130    131400   -5.4700 -138.2800      14.4       126       131        60
OIR    2025130    131400   -5.4700 -138.2900      14.8       128       130        60
OIR    2025130    131400   -5.4700 -138.3000      15.4       131       130        60
OIR    2025130    131400   -5.4700 -138.3100      16.1       134       130        60
OIR    2025130    131400   -5.4700 -138.3200      16.3       136       129        60
OIR    2025130    131400   -5.4700 -138.3300      16.3       136       128        60
OIR    2025130    131400   -5.4700 -138.3400      16.3       136       126        60
OIR    2025130    131400   -5.4700 -138.3500      16.1       138       125        60
OIR    2025130    131400   -5.4700 -138.3600      15.6       142       123        60
OIR    2025130    131400   -5.4700 -138.3700      14.3       144       125        60
OIR    2025130    131400   -5.4700 -138.3800      13.5       146       126        60
OIR    2025130    131400   -5.4700 -138.3900      12.5       146       128        60
OIR    2025130    131400   -5.4700 -138.4000      10.8       145       132        60
OIR    2025130    131400   -5.4700 -138.4100       8.5       145       136        60
OIR    2025130    131400   -5.4700 -138.4200       6.9       144       139        60
OIR    2025130    131400   -5.4700 -138.4300       6.4       143       140        60
OIR    2025130    131400   -5.4700 -138.4400       6.2       138       138        60
OIR    2025130    131400   -5.4700 -138.4500       6.3       129       136        60
OIR    2025130    131400   -5.4700 -138.4600       7.0       118       135        60
OIR    2025130    131400   -5.4700 -138.4700       7.9       109       134        60
OIR    2025130    131400   -5.4700 -138.4800       8.6       102       131        60
OIR    2025130    131400   -5.4700 -138.4900       9.0        95       130        60
OIR    2025130    131400   -5.4700 -138.5000       9.2        90       130        60
OIR    2025130    131400   -5.4700 -138.5100       9.2        87       131        60
OIR    2025130    131400   -5.4700 -138.5200       9.0        84       133        60
OIR    2025130    131400   -5.4700 -138.5300       9.0        83       135        60
OIR    2025130    131400   -5.4700 -138.5400       9.0        83       139        60
OIR    2025130    131400   -5.4700 -138.5500       9.0        82       143        60
OIR    2025130    131400   -5.4700 -138.5600       9.0        82       146        60
OIR    2025130    131400   -5.4700 -138.5700       9.0        82       146        60
OIR    2025130    131400   -5.4700 -138.5800       9.0        82       146        60
OIR    2025130    131400   -5.4700 -138.5900       9.1        82       145        60
OIR    2025130    131400   -5.4700 -138.6000       9.1        81       145        60
OIR    2025130    131400   -5.4700 -138.6100       9.2        81       147        60
OIR    2025130    131400   -5.4700 -138.6200       9.2        81       144        60
OIR    2025130    131400   -5.4700 -138.6300       9.3        81       139        60
OIR    2025130    131400   -5.4700 -138.6400       9.4        81       139        60
OIR    2025130    131400   -5.4700 -138.6500       9.4        81       138        60
OIR    2025130    131400   -5.4700 -138.6600       9.4        80       136        60
OIR    2025130    131400   -5.4700 -138.6700       9.5        80       135        60
OIR    2025130    131400   -5.4700 -138.6800       9.5        80       134        60
OIR    2025130    131400   -5.4700 -138.6900       9.5        80       133        60
OIR    2025130    131400   -5.4700 -138.7000       9.5        80       133        60
OIR    2025130    131400   -5.4700 -138.7100       9.5        80       132        60
OIR    2025130    131400   -5.4700 -138.7200       9.5        80       131        60
OIR    2025130    131400   -5.4700 -138.7300       9.5        80       131        60
OIR    2025130    131400   -5.4700 -138.7400       9.5        81       130        60
OIR    2025130    131400   -5.4700 -138.7500       9.5        81       131        60
OIR    2025130    131400   -5.4700 -138.7600       9.6        81       132        60
OIR    2025130    131400   -5.4700 -138.7700       9.6        81       132        60
OIR    2025130    131400   -5.4700 -138.7800       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.7900       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.8000       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.8300       9.6        81       132        60
OIR    2025130    131400   -5.4700 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.4700 -138.8500       9.5        81       133        60
OIR    2025130    131400   -5.4700 -138.8600       9.5        81       135        60
OIR    2025130    131400   -5.4700 -138.8700       9.5        82       138        60
OIR    2025130    131400   -5.4700 -138.8800       9.4        83       143        60
OIR    2025130    131400   -5.4700 -138.8900       9.3        83       146        60
OIR    2025130    131400   -5.4800 -138.1400      13.7        89       143        60
OIR    2025130    131400   -5.4800 -138.1500      13.6        90       140        60
OIR    2025130    131400   -5.4800 -138.1600      13.5        92       138        60
OIR    2025130    131400   -5.4800 -138.1700      13.4        93       137        60
OIR    2025130    131400   -5.4800 -138.1800      13.4        94       135        60
OIR    2025130    131400   -5.4800 -138.1900      13.3        94       134        60
OIR    2025130    131400   -5.4800 -138.2000      13.3        94       132        60
OIR    2025130    131400   -5.4800 -138.2100      13.2        93       131        60
OIR    2025130    131400   -5.4800 -138.2200      13.1        93       130        60
OIR    2025130    131400   -5.4800 -138.2300      13.1        94       129        60
OIR    2025130    131400   -5.4800 -138.2400      13.1        95       129        60
OIR    2025130    131400   -5.4800 -138.2500      13.1        99       131        60
OIR    2025130    131400   -5.4800 -138.2600      13.1       107       131        60
OIR    2025130    131400   -5.4800 -138.2700      13.3       116       131        60
OIR    2025130    131400   -5.4800 -138.2800      13.7       123       130        60
OIR    2025130    131400   -5.4800 -138.2900      14.3       127       129        60
OIR    2025130    131400   -5.4800 -138.3000      15.0       130       129        60
OIR    2025130    131400   -5.4800 -138.3100      15.7       133       129        60
OIR    2025130    131400   -5.4800 -138.3200      16.1       135       127        60
OIR    2025130    131400   -5.4800 -138.3300      16.3       136       126        60
OIR    2025130    131400   -5.4800 -138.3400      16.2       136       125        60
OIR    2025130    131400   -5.4800 -138.3500      15.1       138       125        60
OIR    2025130    131400   -5.4800 -138.3600      12.8       136       125        60
OIR    2025130    131400   -5.4800 -138.3700       9.4       131       126        60
OIR    2025130    131400   -5.4800 -138.3800       7.1       121       126        60
OIR    2025130    131400   -5.4800 -138.3900       6.6       125       126        60
OIR    2025130    131400   -5.4800 -138.4000       6.2       139       127        60
OIR    2025130    131400   -5.4800 -138.4100       5.8       144       130        60
OIR    2025130    131400   -5.4800 -138.4200       5.6       145       133        60
OIR    2025130    131400   -5.4800 -138.4300       5.5       145       137        60
OIR    2025130    131400   -5.4800 -138.4400       5.4       142       137        60
OIR    2025130    131400   -5.4800 -138.4500       5.4       134       136        60
OIR    2025130    131400   -5.4800 -138.4600       5.9       122       134        60
OIR    2025130    131400   -5.4800 -138.4700       6.7       112       132        60
OIR    2025130    131400   -5.4800 -138.4800       7.4       104       130        60
OIR    2025130    131400   -5.4800 -138.4900       8.1        96       128        60
OIR    2025130    131400   -5.4800 -138.5000       8.6        90       129        60
OIR    2025130    131400   -5.4800 -138.5100       8.8        85       130        60
OIR    2025130    131400   -5.4800 -138.5200       8.8        84       131        60
OIR    2025130    131400   -5.4800 -138.5300       8.9        83       133        60
OIR    2025130    131400   -5.4800 -138.5400       8.9        83       136        60
OIR    2025130    131400   -5.4800 -138.5500       8.9        82       140        60
OIR    2025130    131400   -5.4800 -138.5600       8.9        82       144        60
OIR    2025130    131400   -5.4800 -138.5700       8.9        82       145        60
OIR    2025130    131400   -5.4800 -138.5800       9.0        82       144        60
OIR    2025130    131400   -5.4800 -138.5900       9.1        81       143        60
OIR    2025130    131400   -5.4800 -138.6000       9.2        81       143        60
OIR    2025130    131400   -5.4800 -138.6100       9.2        81       143        60
OIR    2025130    131400   -5.4800 -138.6200       9.3        81       141        60
OIR    2025130    131400   -5.4800 -138.6300       9.4        80       138        60
OIR    2025130    131400   -5.4800 -138.6400       9.4        80       138        60
OIR    2025130    131400   -5.4800 -138.6500       9.4        80       138        60
OIR    2025130    131400   -5.4800 -138.6600       9.5        80       136        60
OIR    2025130    131400   -5.4800 -138.6700       9.5        80       133        60
OIR    2025130    131400   -5.4800 -138.6800       9.5        80       133        60
OIR    2025130    131400   -5.4800 -138.6900       9.5        80       133        60
OIR    2025130    131400   -5.4800 -138.7000       9.5        80       133        60
OIR    2025130    131400   -5.4800 -138.7100       9.5        80       132        60
OIR    2025130    131400   -5.4800 -138.7200       9.5        80       131        60
OIR    2025130    131400   -5.4800 -138.7300       9.5        80       131        60
OIR    2025130    131400   -5.4800 -138.7400       9.5        81       131        60
OIR    2025130    131400   -5.4800 -138.7500       9.6        81       131        60
OIR    2025130    131400   -5.4800 -138.7600       9.6        81       132        60
OIR    2025130    131400   -5.4800 -138.7700       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.7800       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.7900       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8000       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8300       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.4800 -138.8500       9.6        81       134        60
OIR    2025130    131400   -5.4800 -138.8600       9.5        81       134        60
OIR    2025130    131400   -5.4800 -138.8700       9.5        82       135        60
OIR    2025130    131400   -5.4800 -138.8800       9.4        82       138        60
OIR    2025130    131400   -5.4800 -138.8900       9.4        83       141        60
OIR    2025130    131400   -5.4800 -138.9000       9.3        83       144        60
OIR    2025130    131400   -5.4900 -138.1300      13.7        89       146        60
OIR    2025130    131400   -5.4900 -138.1400      13.7        89       141        60
OIR    2025130    131400   -5.4900 -138.1500      13.7        89       138        60
OIR    2025130    131400   -5.4900 -138.1600      13.6        89       136        60
OIR    2025130    131400   -5.4900 -138.1700      13.5        91       135        60
OIR    2025130    131400   -5.4900 -138.1800      13.4        91       135        60
OIR    2025130    131400   -5.4900 -138.1900      13.3        92       134        60
OIR    2025130    131400   -5.4900 -138.2000      13.2        91       132        60
OIR    2025130    131400   -5.4900 -138.2100      13.2        91       131        60
OIR    2025130    131400   -5.4900 -138.2200      13.2        91       129        60
OIR    2025130    131400   -5.4900 -138.2300      13.2        91       127        60
OIR    2025130    131400   -5.4900 -138.2400      13.1        93       127        60
OIR    2025130    131400   -5.4900 -138.2500      13.0        94       130        60
OIR    2025130    131400   -5.4900 -138.2600      12.9        96       131        60
OIR    2025130    131400   -5.4900 -138.2700      12.6       102       131        60
OIR    2025130    131400   -5.4900 -138.2800      12.4       113       130        60
OIR    2025130    131400   -5.4900 -138.2900      13.0       121       128        60
OIR    2025130    131400   -5.4900 -138.3000      14.0       126       128        60
OIR    2025130    131400   -5.4900 -138.3100      14.8       130       128        60
OIR    2025130    131400   -5.4900 -138.3200      15.4       132       126        60
OIR    2025130    131400   -5.4900 -138.3300      15.4       133       125        60
OIR    2025130    131400   -5.4900 -138.3400      14.1       132       124        60
OIR    2025130    131400   -5.4900 -138.3500      11.4       130       125        60
OIR    2025130    131400   -5.4900 -138.3600       9.1       126       126        60
OIR    2025130    131400   -5.4900 -138.3700       7.1       119       126        60
OIR    2025130    131400   -5.4900 -138.3800       6.3       117       126        60
OIR    2025130    131400   -5.4900 -138.3900       5.9       121       125        60
OIR    2025130    131400   -5.4900 -138.4000       5.5       138       125        60
OIR    2025130    131400   -5.4900 -138.4100       5.4       145       125        60
OIR    2025130    131400   -5.4900 -138.4200       5.3       145       128        60
OIR    2025130    131400   -5.4900 -138.4300       5.2       144       133        60
OIR    2025130    131400   -5.4900 -138.4400       5.1       142       135        60
OIR    2025130    131400   -5.4900 -138.4500       5.0       137       135        60
OIR    2025130    131400   -5.4900 -138.4600       5.2       125       133        60
OIR    2025130    131400   -5.4900 -138.4700       5.8       114       131        60
OIR    2025130    131400   -5.4900 -138.4800       6.4       105       128        60
OIR    2025130    131400   -5.4900 -138.4900       7.1        97       127        60
OIR    2025130    131400   -5.4900 -138.5000       7.8        89       128        60
OIR    2025130    131400   -5.4900 -138.5100       8.4        85       129        60
OIR    2025130    131400   -5.4900 -138.5200       8.7        84       129        60
OIR    2025130    131400   -5.4900 -138.5300       8.8        83       131        60
OIR    2025130    131400   -5.4900 -138.5400       8.8        82       132        60
OIR    2025130    131400   -5.4900 -138.5500       8.8        82       137        60
OIR    2025130    131400   -5.4900 -138.5600       8.9        82       141        60
OIR    2025130    131400   -5.4900 -138.5700       8.9        82       142        60
OIR    2025130    131400   -5.4900 -138.5800       9.0        81       142        60
OIR    2025130    131400   -5.4900 -138.5900       9.1        81       141        60
OIR    2025130    131400   -5.4900 -138.6000       9.2        81       140        60
OIR    2025130    131400   -5.4900 -138.6100       9.2        81       140        60
OIR    2025130    131400   -5.4900 -138.6200       9.3        80       139        60
OIR    2025130    131400   -5.4900 -138.6300       9.4        80       136        60
OIR    2025130    131400   -5.4900 -138.6400       9.4        80       137        60
OIR    2025130    131400   -5.4900 -138.6500       9.5        80       137        60
OIR    2025130    131400   -5.4900 -138.6600       9.5        80       135        60
OIR    2025130    131400   -5.4900 -138.6700       9.5        80       133        60
OIR    2025130    131400   -5.4900 -138.6800       9.5        80       132        60
OIR    2025130    131400   -5.4900 -138.6900       9.5        80       132        60
OIR    2025130    131400   -5.4900 -138.7000       9.5        80       132        60
OIR    2025130    131400   -5.4900 -138.7100       9.5        80       131        60
OIR    2025130    131400   -5.4900 -138.7200       9.5        80       130        60
OIR    2025130    131400   -5.4900 -138.7300       9.5        80       130        60
OIR    2025130    131400   -5.4900 -138.7400       9.6        81       131        60
OIR    2025130    131400   -5.4900 -138.7500       9.6        81       131        60
OIR    2025130    131400   -5.4900 -138.7600       9.6        81       132        60
OIR    2025130    131400   -5.4900 -138.7700       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.7800       9.6        81       134        60
OIR    2025130    131400   -5.4900 -138.7900       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8000       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8300       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8400       9.6        81       134        60
OIR    2025130    131400   -5.4900 -138.8500       9.6        81       134        60
OIR    2025130    131400   -5.4900 -138.8600       9.6        81       133        60
OIR    2025130    131400   -5.4900 -138.8700       9.5        82       133        60
OIR    2025130    131400   -5.4900 -138.8800       9.4        82       135        60
OIR    2025130    131400   -5.4900 -138.8900       9.4        83       137        60
OIR    2025130    131400   -5.4900 -138.9000       9.3        83       140        60
OIR    2025130    131400   -5.4900 -138.9100       9.3        83       145        60
OIR    2025130    131400   -5.5000 -138.1300      13.8        87       145        60
OIR    2025130    131400   -5.5000 -138.1400      13.8        88       140        60
OIR    2025130    131400   -5.5000 -138.1500      13.7        88       138        60
OIR    2025130    131400   -5.5000 -138.1600      13.7        88       135        60
OIR    2025130    131400   -5.5000 -138.1700      13.5        88       135        60
OIR    2025130    131400   -5.5000 -138.1800      13.4        89       135        60
OIR    2025130    131400   -5.5000 -138.1900      13.3        89       134        60
OIR    2025130    131400   -5.5000 -138.2000      13.3        89       133        60
OIR    2025130    131400   -5.5000 -138.2100      13.3        88       132        60
OIR    2025130    131400   -5.5000 -138.2200      13.3        88       130        60
OIR    2025130    131400   -5.5000 -138.2300      13.2        89       127        60
OIR    2025130    131400   -5.5000 -138.2400      13.1        89       127        60
OIR    2025130    131400   -5.5000 -138.2500      12.9        90       129        60
OIR    2025130    131400   -5.5000 -138.2600      12.8        91       130        60
OIR    2025130    131400   -5.5000 -138.2700      12.3        92       131        60
OIR    2025130    131400   -5.5000 -138.2800      11.9        94       130        60
OIR    2025130    131400   -5.5000 -138.2900      11.5        99       129        60
OIR    2025130    131400   -5.5000 -138.3000      11.8       107       127        60
OIR    2025130    131400   -5.5000 -138.3100      12.3       115       127        60
OIR    2025130    131400   -5.5000 -138.3200      12.5       119       126        60
OIR    2025130    131400   -5.5000 -138.3300      11.4       119       125        60
OIR    2025130    131400   -5.5000 -138.3400      10.2       118       125        60
OIR    2025130    131400   -5.5000 -138.3500       8.5       118       126        60
OIR    2025130    131400   -5.5000 -138.3600       6.6       112       128        60
OIR    2025130    131400   -5.5000 -138.3700       5.5       106       127        60
OIR    2025130    131400   -5.5000 -138.3800       5.1       105       126        60
OIR    2025130    131400   -5.5000 -138.3900       4.7       109       126        60
OIR    2025130    131400   -5.5000 -138.4000       4.4       127       125        60
OIR    2025130    131400   -5.5000 -138.4100       4.6       141       124        60
OIR    2025130    131400   -5.5000 -138.4200       4.9       143       125        60
OIR    2025130    131400   -5.5000 -138.4300       4.9       142       129        60
OIR    2025130    131400   -5.5000 -138.4400       4.5       139       132        60
OIR    2025130    131400   -5.5000 -138.4500       4.6       134       133        60
OIR    2025130    131400   -5.5000 -138.4600       4.6       125       131        60
OIR    2025130    131400   -5.5000 -138.4700       4.8       116       129        60
OIR    2025130    131400   -5.5000 -138.4800       5.2       107       128        60
OIR    2025130    131400   -5.5000 -138.4900       6.1        97       127        60
OIR    2025130    131400   -5.5000 -138.5000       7.1        89       127        60
OIR    2025130    131400   -5.5000 -138.5100       8.0        85       127        60
OIR    2025130    131400   -5.5000 -138.5200       8.5        84       128        60
OIR    2025130    131400   -5.5000 -138.5300       8.7        83       129        60
OIR    2025130    131400   -5.5000 -138.5400       8.7        82       129        60
OIR    2025130    131400   -5.5000 -138.5500       8.8        82       133        60
OIR    2025130    131400   -5.5000 -138.5600       8.8        82       137        60
OIR    2025130    131400   -5.5000 -138.5700       8.9        81       137        60
OIR    2025130    131400   -5.5000 -138.5800       9.0        81       137        60
OIR    2025130    131400   -5.5000 -138.5900       9.1        81       137        60
OIR    2025130    131400   -5.5000 -138.6000       9.2        80       137        60
OIR    2025130    131400   -5.5000 -138.6100       9.3        80       137        60
OIR    2025130    131400   -5.5000 -138.6200       9.4        80       136        60
OIR    2025130    131400   -5.5000 -138.6300       9.4        80       135        60
OIR    2025130    131400   -5.5000 -138.6400       9.5        80       135        60
OIR    2025130    131400   -5.5000 -138.6500       9.5        80       136        60
OIR    2025130    131400   -5.5000 -138.6600       9.5        80       134        60
OIR    2025130    131400   -5.5000 -138.6700       9.5        80       133        60
OIR    2025130    131400   -5.5000 -138.6800       9.5        80       131        60
OIR    2025130    131400   -5.5000 -138.6900       9.5        80       131        60
OIR    2025130    131400   -5.5000 -138.7000       9.5        80       131        60
OIR    2025130    131400   -5.5000 -138.7100       9.5        80       130        60
OIR    2025130    131400   -5.5000 -138.7200       9.5        80       129        60
OIR    2025130    131400   -5.5000 -138.7300       9.6        80       130        60
OIR    2025130    131400   -5.5000 -138.7400       9.6        80       131        60
OIR    2025130    131400   -5.5000 -138.7500       9.6        81       132        60
OIR    2025130    131400   -5.5000 -138.7600       9.6        81       132        60
OIR    2025130    131400   -5.5000 -138.7700       9.6        81       134        60
OIR    2025130    131400   -5.5000 -138.7800       9.6        81       134        60
OIR    2025130    131400   -5.5000 -138.7900       9.6        81       134        60
OIR    2025130    131400   -5.5000 -138.8000       9.6        81       134        60
OIR    2025130    131400   -5.5000 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.5000 -138.8200       9.6        81       132        60
OIR    2025130    131400   -5.5000 -138.8300       9.6        81       132        60
OIR    2025130    131400   -5.5000 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.5000 -138.8500       9.6        81       134        60
OIR    2025130    131400   -5.5000 -138.8600       9.6        81       133        60
OIR    2025130    131400   -5.5000 -138.8700       9.6        81       133        60
OIR    2025130    131400   -5.5000 -138.8800       9.5        82       134        60
OIR    2025130    131400   -5.5000 -138.8900       9.4        82       135        60
OIR    2025130    131400   -5.5000 -138.9000       9.4        83       137        60
OIR    2025130    131400   -5.5000 -138.9100       9.3        83       140        60
OIR    2025130    131400   -5.5000 -138.9200       9.3        83       143        60
OIR    2025130    131400   -5.5000 -139.0200       9.6        99       146        60
OIR    2025130    131400   -5.5000 -139.0300       6.3       108       139        60
OIR    2025130    131400   -5.5100 -138.1200      13.8        84       146        60
OIR    2025130    131400   -5.5100 -138.1300      13.8        85       142        60
OIR    2025130    131400   -5.5100 -138.1400      13.8        85       137        60
OIR    2025130    131400   -5.5100 -138.1500      13.8        86       136        60
OIR    2025130    131400   -5.5100 -138.1600      13.7        86       134        60
OIR    2025130    131400   -5.5100 -138.1700      13.6        86       134        60
OIR    2025130    131400   -5.5100 -138.1800      13.5        87       134        60
OIR    2025130    131400   -5.5100 -138.1900      13.4        87       133        60
OIR    2025130    131400   -5.5100 -138.2000      13.4        87       133        60
OIR    2025130    131400   -5.5100 -138.2100      13.3        87       132        60
OIR    2025130    131400   -5.5100 -138.2200      13.3        87       130        60
OIR    2025130    131400   -5.5100 -138.2300      13.2        88       127        60
OIR    2025130    131400   -5.5100 -138.2400      13.1        88       126        60
OIR    2025130    131400   -5.5100 -138.2500      12.9        88       128        60
OIR    2025130    131400   -5.5100 -138.2600      12.7        89       129        60
OIR    2025130    131400   -5.5100 -138.2700      12.2        90       130        60
OIR    2025130    131400   -5.5100 -138.2800      11.8        90       129        60
OIR    2025130    131400   -5.5100 -138.2900      11.5        92       127        60
OIR    2025130    131400   -5.5100 -138.3000      11.2        94       126        60
OIR    2025130    131400   -5.5100 -138.3100      11.0        97       125        60
OIR    2025130    131400   -5.5100 -138.3200      10.6       102       125        60
OIR    2025130    131400   -5.5100 -138.3300       9.9       106       125        60
OIR    2025130    131400   -5.5100 -138.3400       8.9       108       125        60
OIR    2025130    131400   -5.5100 -138.3500       7.1       106       125        60
OIR    2025130    131400   -5.5100 -138.3600       5.7       103       127        60
OIR    2025130    131400   -5.5100 -138.3700       5.0       100       126        60
OIR    2025130    131400   -5.5100 -138.3800       4.7        99       125        60
OIR    2025130    131400   -5.5100 -138.3900       4.5       101       124        60
OIR    2025130    131400   -5.5100 -138.4000       4.0       113       123        60
OIR    2025130    131400   -5.5100 -138.4200       4.0       134       122        60
OIR    2025130    131400   -5.5100 -138.4500       4.1       126       128        60
OIR    2025130    131400   -5.5100 -138.4600       4.1       121       127        60
OIR    2025130    131400   -5.5100 -138.4700       4.2       114       126        60
OIR    2025130    131400   -5.5100 -138.4800       4.4       107       125        60
OIR    2025130    131400   -5.5100 -138.4900       5.1        98       124        60
OIR    2025130    131400   -5.5100 -138.5000       6.3        91       125        60
OIR    2025130    131400   -5.5100 -138.5100       7.5        86       125        60
OIR    2025130    131400   -5.5100 -138.5200       8.3        84       126        60
OIR    2025130    131400   -5.5100 -138.5300       8.6        83       126        60
OIR    2025130    131400   -5.5100 -138.5400       8.7        82       127        60
OIR    2025130    131400   -5.5100 -138.5500       8.7        82       130        60
OIR    2025130    131400   -5.5100 -138.5600       8.8        81       133        60
OIR    2025130    131400   -5.5100 -138.5700       8.8        81       133        60
OIR    2025130    131400   -5.5100 -138.5800       8.9        81       134        60
OIR    2025130    131400   -5.5100 -138.5900       9.1        81       134        60
OIR    2025130    131400   -5.5100 -138.6000       9.2        80       134        60
OIR    2025130    131400   -5.5100 -138.6100       9.3        80       134        60
OIR    2025130    131400   -5.5100 -138.6200       9.4        80       134        60
OIR    2025130    131400   -5.5100 -138.6300       9.5        80       132        60
OIR    2025130    131400   -5.5100 -138.6400       9.5        80       133        60
OIR    2025130    131400   -5.5100 -138.6500       9.5        80       134        60
OIR    2025130    131400   -5.5100 -138.6600       9.5        80       134        60
OIR    2025130    131400   -5.5100 -138.6700       9.5        80       133        60
OIR    2025130    131400   -5.5100 -138.6800       9.5        80       131        60
OIR    2025130    131400   -5.5100 -138.6900       9.5        80       131        60
OIR    2025130    131400   -5.5100 -138.7000       9.5        80       131        60
OIR    2025130    131400   -5.5100 -138.7100       9.5        80       130        60
OIR    2025130    131400   -5.5100 -138.7200       9.6        80       129        60
OIR    2025130    131400   -5.5100 -138.7300       9.6        80       129        60
OIR    2025130    131400   -5.5100 -138.7400       9.6        80       131        60
OIR    2025130    131400   -5.5100 -138.7500       9.6        81       131        60
OIR    2025130    131400   -5.5100 -138.7600       9.6        81       132        60
OIR    2025130    131400   -5.5100 -138.7700       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.7800       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.7900       9.6        81       134        60
OIR    2025130    131400   -5.5100 -138.8000       9.6        81       134        60
OIR    2025130    131400   -5.5100 -138.8100       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.8300       9.6        81       132        60
OIR    2025130    131400   -5.5100 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.8500       9.6        81       134        60
OIR    2025130    131400   -5.5100 -138.8600       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.8700       9.6        81       132        60
OIR    2025130    131400   -5.5100 -138.8800       9.6        81       133        60
OIR    2025130    131400   -5.5100 -138.8900       9.5        82       134        60
OIR    2025130    131400   -5.5100 -138.9000       9.4        82       135        60
OIR    2025130    131400   -5.5100 -138.9100       9.4        83       136        60
OIR    2025130    131400   -5.5100 -138.9200       9.4        83       137        60
OIR    2025130    131400   -5.5100 -138.9300       9.3        83       143        60
OIR    2025130    131400   -5.5100 -138.9400       9.3        83       147        60
OIR    2025130    131400   -5.5100 -138.9700       9.1        87       148        60
OIR    2025130    131400   -5.5100 -139.0100       9.5        97       146        60
OIR    2025130    131400   -5.5100 -139.0200       9.3        95       140        60
OIR    2025130    131400   -5.5100 -139.0300       4.8        98       134        60
OIR    2025130    131400   -5.5200 -138.1000      13.8        81       146        60
OIR    2025130    131400   -5.5200 -138.1100      13.8        81       142        60
OIR    2025130    131400   -5.5200 -138.1200      13.9        82       139        60
OIR    2025130    131400   -5.5200 -138.1300      13.9        82       136        60
OIR    2025130    131400   -5.5200 -138.1400      13.9        83       133        60
OIR    2025130    131400   -5.5200 -138.1500      13.9        83       133        60
OIR    2025130    131400   -5.5200 -138.1600      13.8        84       133        60
OIR    2025130    131400   -5.5200 -138.1700      13.8        84       133        60
OIR    2025130    131400   -5.5200 -138.1800      13.7        85       134        60
OIR    2025130    131400   -5.5200 -138.1900      13.6        85       132        60
OIR    2025130    131400   -5.5200 -138.2000      13.5        86       131        60
OIR    2025130    131400   -5.5200 -138.2100      13.4        86       131        60
OIR    2025130    131400   -5.5200 -138.2200      13.3        86       129        60
OIR    2025130    131400   -5.5200 -138.2300      13.2        86       127        60
OIR    2025130    131400   -5.5200 -138.2400      13.1        87       126        60
OIR    2025130    131400   -5.5200 -138.2500      12.9        87       128        60
OIR    2025130    131400   -5.5200 -138.2600      12.6        87       129        60
OIR    2025130    131400   -5.5200 -138.2700      12.1        88       129        60
OIR    2025130    131400   -5.5200 -138.2800      11.8        89       127        60
OIR    2025130    131400   -5.5200 -138.2900      11.5        89       125        60
OIR    2025130    131400   -5.5200 -138.3000      11.2        91       124        60
OIR    2025130    131400   -5.5200 -138.3100      10.9        92       123        60
OIR    2025130    131400   -5.5200 -138.3200      10.4        95       123        60
OIR    2025130    131400   -5.5200 -138.3300       9.5        98       124        60
OIR    2025130    131400   -5.5200 -138.3400       8.3        99       124        60
OIR    2025130    131400   -5.5200 -138.3500       6.5        99       124        60
OIR    2025130    131400   -5.5200 -138.3600       5.3        97       123        60
OIR    2025130    131400   -5.5200 -138.3700       4.8        94       123        60
OIR    2025130    131400   -5.5200 -138.3800       4.6        95       123        60
OIR    2025130    131400   -5.5200 -138.3900       4.4        96       120        60
OIR    2025130    131400   -5.5200 -138.4000       4.0       103       119        60
OIR    2025130    131400   -5.5200 -138.4900       4.3        98       119        60
OIR    2025130    131400   -5.5200 -138.5000       5.4        91       122        60
OIR    2025130    131400   -5.5200 -138.5100       6.8        86       123        60
OIR    2025130    131400   -5.5200 -138.5200       7.9        84       123        60
OIR    2025130    131400   -5.5200 -138.5300       8.4        82       124        60
OIR    2025130    131400   -5.5200 -138.5400       8.6        82       125        60
OIR    2025130    131400   -5.5200 -138.5500       8.7        81       127        60
OIR    2025130    131400   -5.5200 -138.5600       8.8        81       129        60
OIR    2025130    131400   -5.5200 -138.5700       8.8        81       130        60
OIR    2025130    131400   -5.5200 -138.5800       8.9        81       131        60
OIR    2025130    131400   -5.5200 -138.5900       9.1        81       132        60
OIR    2025130    131400   -5.5200 -138.6000       9.2        80       132        60
OIR    2025130    131400   -5.5200 -138.6100       9.3        80       132        60
OIR    2025130    131400   -5.5200 -138.6200       9.4        80       131        60
OIR    2025130    131400   -5.5200 -138.6300       9.5        80       130        60
OIR    2025130    131400   -5.5200 -138.6400       9.5        80       131        60
OIR    2025130    131400   -5.5200 -138.6500       9.5        80       132        60
OIR    2025130    131400   -5.5200 -138.6600       9.5        80       133        60
OIR    2025130    131400   -5.5200 -138.6700       9.5        80       133        60
OIR    2025130    131400   -5.5200 -138.6800       9.5        80       131        60
OIR    2025130    131400   -5.5200 -138.6900       9.5        80       131        60
OIR    2025130    131400   -5.5200 -138.7000       9.5        80       131        60
OIR    2025130    131400   -5.5200 -138.7100       9.6        80       130        60
OIR    2025130    131400   -5.5200 -138.7200       9.6        80       128        60
OIR    2025130    131400   -5.5200 -138.7300       9.6        80       129        60
OIR    2025130    131400   -5.5200 -138.7400       9.6        80       130        60
OIR    2025130    131400   -5.5200 -138.7500       9.6        80       131        60
OIR    2025130    131400   -5.5200 -138.7600       9.6        81       131        60
OIR    2025130    131400   -5.5200 -138.7700       9.6        81       131        60
OIR    2025130    131400   -5.5200 -138.7800       9.6        81       131        60
OIR    2025130    131400   -5.5200 -138.7900       9.6        81       132        60
OIR    2025130    131400   -5.5200 -138.8000       9.6        81       133        60
OIR    2025130    131400   -5.5200 -138.8100       9.6        81       134        60
OIR    2025130    131400   -5.5200 -138.8200       9.6        81       133        60
OIR    2025130    131400   -5.5200 -138.8300       9.6        81       133        60
OIR    2025130    131400   -5.5200 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.5200 -138.8500       9.6        81       133        60
OIR    2025130    131400   -5.5200 -138.8600       9.6        81       131        60
OIR    2025130    131400   -5.5200 -138.8700       9.6        81       131        60
OIR    2025130    131400   -5.5200 -138.8800       9.6        81       132        60
OIR    2025130    131400   -5.5200 -138.8900       9.6        81       132        60
OIR    2025130    131400   -5.5200 -138.9000       9.5        82       133        60
OIR    2025130    131400   -5.5200 -138.9100       9.4        82       133        60
OIR    2025130    131400   -5.5200 -138.9200       9.4        83       133        60
OIR    2025130    131400   -5.5200 -138.9300       9.3        83       135        60
OIR    2025130    131400   -5.5200 -138.9400       9.3        83       137        60
OIR    2025130    131400   -5.5200 -138.9500       9.2        84       136        60
OIR    2025130    131400   -5.5200 -138.9600       9.0        85       137        60
OIR    2025130    131400   -5.5200 -138.9700       9.0        86       141        60
OIR    2025130    131400   -5.5200 -138.9800       9.1        87       143        60
OIR    2025130    131400   -5.5200 -138.9900       8.8        90       145        60
OIR    2025130    131400   -5.5200 -139.0000       8.8        91       141        60
OIR    2025130    131400   -5.5200 -139.0100       8.9        91       136        60
OIR    2025130    131400   -5.5200 -139.0200       8.9        91       134        60
OIR    2025130    131400   -5.5200 -139.0300       4.8        99       131        60
OIR    2025130    131400   -5.5300 -138.1000      13.9        80       146        60
OIR    2025130    131400   -5.5300 -138.1100      13.9        80       141        60
OIR    2025130    131400   -5.5300 -138.1200      13.9        81       137        60
OIR    2025130    131400   -5.5300 -138.1300      13.9        82       135        60
OIR    2025130    131400   -5.5300 -138.1400      14.0        82       134        60
OIR    2025130    131400   -5.5300 -138.1500      14.0        82       135        60
OIR    2025130    131400   -5.5300 -138.1600      13.9        82       135        60
OIR    2025130    131400   -5.5300 -138.1700      13.9        83       134        60
OIR    2025130    131400   -5.5300 -138.1800      13.9        83       134        60
OIR    2025130    131400   -5.5300 -138.1900      13.8        83       133        60
OIR    2025130    131400   -5.5300 -138.2000      13.6        84       133        60
OIR    2025130    131400   -5.5300 -138.2100      13.4        84       132        60
OIR    2025130    131400   -5.5300 -138.2200      13.3        84       130        60
OIR    2025130    131400   -5.5300 -138.2300      13.2        84       128        60
OIR    2025130    131400   -5.5300 -138.2400      13.1        84       128        60
OIR    2025130    131400   -5.5300 -138.2500      12.8        85       129        60
OIR    2025130    131400   -5.5300 -138.2600      12.5        85       130        60
OIR    2025130    131400   -5.5300 -138.2700      12.1        86       130        60
OIR    2025130    131400   -5.5300 -138.2800      11.8        86       128        60
OIR    2025130    131400   -5.5300 -138.2900      11.4        87       126        60
OIR    2025130    131400   -5.5300 -138.3000      11.1        88       125        60
OIR    2025130    131400   -5.5300 -138.3100      10.8        89       125        60
OIR    2025130    131400   -5.5300 -138.3200      10.3        90       124        60
OIR    2025130    131400   -5.5300 -138.3300       9.5        91       124        60
OIR    2025130    131400   -5.5300 -138.3400       8.2        93       124        60
OIR    2025130    131400   -5.5300 -138.3500       6.3        94       124        60
OIR    2025130    131400   -5.5300 -138.3600       5.0        93       124        60
OIR    2025130    131400   -5.5300 -138.3700       4.8        91       123        60
OIR    2025130    131400   -5.5300 -138.3800       4.7        91       122        60
OIR    2025130    131400   -5.5300 -138.3900       4.4        93       117        60
OIR    2025130    131400   -5.5300 -138.4000       4.3        96       117        60
OIR    2025130    131400   -5.5300 -138.5000       4.5        92       122        60
OIR    2025130    131400   -5.5300 -138.5100       6.0        87       123        60
OIR    2025130    131400   -5.5300 -138.5200       7.4        83       123        60
OIR    2025130    131400   -5.5300 -138.5300       8.2        82       124        60
OIR    2025130    131400   -5.5300 -138.5400       8.6        81       125        60
OIR    2025130    131400   -5.5300 -138.5500       8.7        81       126        60
OIR    2025130    131400   -5.5300 -138.5600       8.8        81       127        60
OIR    2025130    131400   -5.5300 -138.5700       8.9        81       128        60
OIR    2025130    131400   -5.5300 -138.5800       8.9        81       129        60
OIR    2025130    131400   -5.5300 -138.5900       9.1        81       130        60
OIR    2025130    131400   -5.5300 -138.6000       9.3        80       130        60
OIR    2025130    131400   -5.5300 -138.6100       9.4        80       131        60
OIR    2025130    131400   -5.5300 -138.6200       9.5        80       130        60
OIR    2025130    131400   -5.5300 -138.6300       9.5        80       130        60
OIR    2025130    131400   -5.5300 -138.6400       9.5        80       131        60
OIR    2025130    131400   -5.5300 -138.6500       9.6        80       132        60
OIR    2025130    131400   -5.5300 -138.6600       9.6        80       133        60
OIR    2025130    131400   -5.5300 -138.6700       9.6        80       134        60
OIR    2025130    131400   -5.5300 -138.6800       9.6        80       133        60
OIR    2025130    131400   -5.5300 -138.6900       9.6        80       132        60
OIR    2025130    131400   -5.5300 -138.7000       9.6        80       133        60
OIR    2025130    131400   -5.5300 -138.7100       9.6        80       132        60
OIR    2025130    131400   -5.5300 -138.7200       9.6        80       130        60
OIR    2025130    131400   -5.5300 -138.7300       9.6        80       131        60
OIR    2025130    131400   -5.5300 -138.7400       9.6        80       132        60
OIR    2025130    131400   -5.5300 -138.7500       9.6        80       133        60
OIR    2025130    131400   -5.5300 -138.7600       9.6        80       134        60
OIR    2025130    131400   -5.5300 -138.7700       9.6        81       133        60
OIR    2025130    131400   -5.5300 -138.7800       9.6        81       133        60
OIR    2025130    131400   -5.5300 -138.7900       9.6        81       135        60
OIR    2025130    131400   -5.5300 -138.8000       9.6        81       136        60
OIR    2025130    131400   -5.5300 -138.8100       9.6        81       135        60
OIR    2025130    131400   -5.5300 -138.8200       9.6        81       134        60
OIR    2025130    131400   -5.5300 -138.8300       9.6        81       133        60
OIR    2025130    131400   -5.5300 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.5300 -138.8500       9.6        81       132        60
OIR    2025130    131400   -5.5300 -138.8600       9.6        81       131        60
OIR    2025130    131400   -5.5300 -138.8700       9.6        81       130        60
OIR    2025130    131400   -5.5300 -138.8800       9.6        81       131        60
OIR    2025130    131400   -5.5300 -138.8900       9.6        81       132        60
OIR    2025130    131400   -5.5300 -138.9000       9.5        81       132        60
OIR    2025130    131400   -5.5300 -138.9100       9.5        82       133        60
OIR    2025130    131400   -5.5300 -138.9200       9.4        82       133        60
OIR    2025130    131400   -5.5300 -138.9300       9.4        83       135        60
OIR    2025130    131400   -5.5300 -138.9400       9.3        83       137        60
OIR    2025130    131400   -5.5300 -138.9500       9.1        84       136        60
OIR    2025130    131400   -5.5300 -138.9600       8.9        85       137        60
OIR    2025130    131400   -5.5300 -138.9700       8.9        85       140        60
OIR    2025130    131400   -5.5300 -138.9800       8.9        86       143        60
OIR    2025130    131400   -5.5300 -138.9900       8.6        88       148        60
OIR    2025130    131400   -5.5300 -139.0000       8.6        90       147        60
OIR    2025130    131400   -5.5300 -139.0100       8.6        90       144        60
OIR    2025130    131400   -5.5300 -139.0200       8.6        91       140        60
OIR    2025130    131400   -5.5300 -139.0300       5.2        96       136        60
OIR    2025130    131400   -5.5300 -139.0400       4.1        99       144        60
OIR    2025130    131400   -5.5400 -138.1100      14.0        79       144        60
OIR    2025130    131400   -5.5400 -138.1200      14.0        80       139        60
OIR    2025130    131400   -5.5400 -138.1300      14.0        81       138        60
OIR    2025130    131400   -5.5400 -138.1400      14.0        81       138        60
OIR    2025130    131400   -5.5400 -138.1500      14.0        81       137        60
OIR    2025130    131400   -5.5400 -138.1600      14.0        81       137        60
OIR    2025130    131400   -5.5400 -138.1700      14.0        81       136        60
OIR    2025130    131400   -5.5400 -138.1800      14.0        82       134        60
OIR    2025130    131400   -5.5400 -138.1900      13.9        82       135        60
OIR    2025130    131400   -5.5400 -138.2000      13.7        82       134        60
OIR    2025130    131400   -5.5400 -138.2100      13.6        83       132        60
OIR    2025130    131400   -5.5400 -138.2200      13.4        83       131        60
OIR    2025130    131400   -5.5400 -138.2300      13.3        83       130        60
OIR    2025130    131400   -5.5400 -138.2400      13.1        83       130        60
OIR    2025130    131400   -5.5400 -138.2500      12.8        83       130        60
OIR    2025130    131400   -5.5400 -138.2600      12.5        83       131        60
OIR    2025130    131400   -5.5400 -138.2700      12.1        84       131        60
OIR    2025130    131400   -5.5400 -138.2800      11.8        85       129        60
OIR    2025130    131400   -5.5400 -138.2900      11.4        85       128        60
OIR    2025130    131400   -5.5400 -138.3000      11.2        86       128        60
OIR    2025130    131400   -5.5400 -138.3100      10.8        87       126        60
OIR    2025130    131400   -5.5400 -138.3200      10.3        87       124        60
OIR    2025130    131400   -5.5400 -138.3300       9.4        88       123        60
OIR    2025130    131400   -5.5400 -138.3400       8.3        88       123        60
OIR    2025130    131400   -5.5400 -138.3500       6.4        90       124        60
OIR    2025130    131400   -5.5400 -138.3600       4.9        90       125        60
OIR    2025130    131400   -5.5400 -138.3700       4.8        89       123        60
OIR    2025130    131400   -5.5400 -138.3800       4.8        89       121        60
OIR    2025130    131400   -5.5400 -138.3900       4.5        90       116        60
OIR    2025130    131400   -5.5400 -138.4000       4.4        92       116        60
OIR    2025130    131400   -5.5400 -138.5100       5.1        85       123        60
OIR    2025130    131400   -5.5400 -138.5200       6.9        82       124        60
OIR    2025130    131400   -5.5400 -138.5300       8.1        81       124        60
OIR    2025130    131400   -5.5400 -138.5400       8.5        81       124        60
OIR    2025130    131400   -5.5400 -138.5500       8.7        81       125        60
OIR    2025130    131400   -5.5400 -138.5600       8.8        81       125        60
OIR    2025130    131400   -5.5400 -138.5700       8.9        81       126        60
OIR    2025130    131400   -5.5400 -138.5800       9.0        81       127        60
OIR    2025130    131400   -5.5400 -138.5900       9.2        80       128        60
OIR    2025130    131400   -5.5400 -138.6000       9.3        80       129        60
OIR    2025130    131400   -5.5400 -138.6100       9.4        80       129        60
OIR    2025130    131400   -5.5400 -138.6200       9.5        80       130        60
OIR    2025130    131400   -5.5400 -138.6300       9.5        80       131        60
OIR    2025130    131400   -5.5400 -138.6400       9.6        80       132        60
OIR    2025130    131400   -5.5400 -138.6500       9.6        80       132        60
OIR    2025130    131400   -5.5400 -138.6600       9.6        80       134        60
OIR    2025130    131400   -5.5400 -138.6700       9.6        80       135        60
OIR    2025130    131400   -5.5400 -138.6800       9.6        80       134        60
OIR    2025130    131400   -5.5400 -138.6900       9.6        80       134        60
OIR    2025130    131400   -5.5400 -138.7000       9.6        80       135        60
OIR    2025130    131400   -5.5400 -138.7100       9.6        80       134        60
OIR    2025130    131400   -5.5400 -138.7200       9.6        80       132        60
OIR    2025130    131400   -5.5400 -138.7300       9.6        80       132        60
OIR    2025130    131400   -5.5400 -138.7400       9.6        80       134        60
OIR    2025130    131400   -5.5400 -138.7500       9.6        80       136        60
OIR    2025130    131400   -5.5400 -138.7600       9.6        80       137        60
OIR    2025130    131400   -5.5400 -138.7700       9.6        80       136        60
OIR    2025130    131400   -5.5400 -138.7800       9.6        81       137        60
OIR    2025130    131400   -5.5400 -138.7900       9.6        81       139        60
OIR    2025130    131400   -5.5400 -138.8000       9.6        81       139        60
OIR    2025130    131400   -5.5400 -138.8100       9.6        81       137        60
OIR    2025130    131400   -5.5400 -138.8200       9.6        81       136        60
OIR    2025130    131400   -5.5400 -138.8300       9.6        81       134        60
OIR    2025130    131400   -5.5400 -138.8400       9.6        81       133        60
OIR    2025130    131400   -5.5400 -138.8500       9.6        81       132        60
OIR    2025130    131400   -5.5400 -138.8600       9.6        81       131        60
OIR    2025130    131400   -5.5400 -138.8700       9.6        81       130        60
OIR    2025130    131400   -5.5400 -138.8800       9.6        81       131        60
OIR    2025130    131400   -5.5400 -138.8900       9.6        81       131        60
OIR    2025130    131400   -5.5400 -138.9000       9.6        81       132        60
OIR    2025130    131400   -5.5400 -138.9100       9.5        81       132        60
OIR    2025130    131400   -5.5400 -138.9200       9.5        82       134        60
OIR    2025130    131400   -5.5400 -138.9300       9.4        82       136        60
OIR    2025130    131400   -5.5400 -138.9400       9.3        82       138        60
OIR    2025130    131400   -5.5400 -138.9500       9.1        83       137        60
OIR    2025130    131400   -5.5400 -138.9600       8.8        84       138        60
OIR    2025130    131400   -5.5400 -138.9700       8.7        85       139        60
OIR    2025130    131400   -5.5400 -138.9800       8.7        85       144        60
OIR    2025130    131400   -5.5400 -139.0200       8.3        90       147        60
OIR    2025130    131400   -5.5400 -139.0300       5.2        91       142        60
OIR    2025130    131400   -5.5500 -138.1100      14.2        78       141        60
OIR    2025130    131400   -5.5500 -138.1200      14.2        79       138        60
OIR    2025130    131400   -5.5500 -138.1300      14.2        79       137        60
OIR    2025130    131400   -5.5500 -138.1400      14.1        80       138        60
OIR    2025130    131400   -5.5500 -138.1500      14.1        80       137        60
OIR    2025130    131400   -5.5500 -138.1600      14.0        80       136        60
OIR    2025130    131400   -5.5500 -138.1700      14.0        81       136        60
OIR    2025130    131400   -5.5500 -138.1800      14.0        81       136        60
OIR    2025130    131400   -5.5500 -138.1900      14.0        81       136        60
OIR    2025130    131400   -5.5500 -138.2000      13.9        81       136        60
OIR    2025130    131400   -5.5500 -138.2100      13.7        81       135        60
OIR    2025130    131400   -5.5500 -138.2200      13.5        81       133        60
OIR    2025130    131400   -5.5500 -138.2300      13.4        81       131        60
OIR    2025130    131400   -5.5500 -138.2400      13.2        82       130        60
OIR    2025130    131400   -5.5500 -138.2500      12.9        82       129        60
OIR    2025130    131400   -5.5500 -138.2600      12.6        82       130        60
OIR    2025130    131400   -5.5500 -138.2700      12.2        82       131        60
OIR    2025130    131400   -5.5500 -138.2800      11.8        83       128        60
OIR    2025130    131400   -5.5500 -138.2900      11.4        83       126        60
OIR    2025130    131400   -5.5500 -138.3000      11.2        84       126        60
OIR    2025130    131400   -5.5500 -138.3100      10.8        84       125        60
OIR    2025130    131400   -5.5500 -138.3200      10.1        85       124        60
OIR    2025130    131400   -5.5500 -138.3300       9.4        85       124        60
OIR    2025130    131400   -5.5500 -138.3400       8.4        86       124        60
OIR    2025130    131400   -5.5500 -138.3500       6.6        87       125        60
OIR    2025130    131400   -5.5500 -138.3600       5.0        87       127        60
OIR    2025130    131400   -5.5500 -138.3700       4.9        87       124        60
OIR    2025130    131400   -5.5500 -138.3800       4.9        88       121        60
OIR    2025130    131400   -5.5500 -138.3900       4.7        88       117        60
OIR    2025130    131400   -5.5500 -138.4000       4.7        88       117        60
OIR    2025130    131400   -5.5500 -138.5100       4.5        81       123        60
OIR    2025130    131400   -5.5500 -138.5200       6.6        80       124        60
OIR    2025130    131400   -5.5500 -138.5300       8.0        80       124        60
OIR    2025130    131400   -5.5500 -138.5400       8.5        80       124        60
OIR    2025130    131400   -5.5500 -138.5500       8.7        80       124        60
OIR    2025130    131400   -5.5500 -138.5600       8.8        80       124        60
OIR    2025130    131400   -5.5500 -138.5700       8.9        80       125        60
OIR    2025130    131400   -5.5500 -138.5800       9.1        80       126        60
OIR    2025130    131400   -5.5500 -138.5900       9.3        80       127        60
OIR    2025130    131400   -5.5500 -138.6000       9.4        80       128        60
OIR    2025130    131400   -5.5500 -138.6100       9.5        80       129        60
OIR    2025130    131400   -5.5500 -138.6200       9.5        80       130        60
OIR    2025130    131400   -5.5500 -138.6300       9.6        80       131        60
OIR    2025130    131400   -5.5500 -138.6400       9.6        80       131        60
OIR    2025130    131400   -5.5500 -138.6500       9.6        80       132        60
OIR    2025130    131400   -5.5500 -138.6600       9.6        80       133        60
OIR    2025130    131400   -5.5500 -138.6700       9.6        80       134        60
OIR    2025130    131400   -5.5500 -138.6800       9.6        80       135        60
OIR    2025130    131400   -5.5500 -138.6900       9.6        80       136        60
OIR    2025130    131400   -5.5500 -138.7000       9.6        80       136        60
OIR    2025130    131400   -5.5500 -138.7100       9.6        80       135        60
OIR    2025130    131400   -5.5500 -138.7200       9.6        80       133        60
OIR    2025130    131400   -5.5500 -138.7300       9.6        80       134        60
OIR    2025130    131400   -5.5500 -138.7400       9.6        80       135        60
OIR    2025130    131400   -5.5500 -138.7500       9.6        80       137        60
OIR    2025130    131400   -5.5500 -138.7600       9.6        80       137        60
OIR    2025130    131400   -5.5500 -138.7700       9.6        80       136        60
OIR    2025130    131400   -5.5500 -138.7800       9.6        80       135        60
OIR    2025130    131400   -5.5500 -138.7900       9.6        80       137        60
OIR    2025130    131400   -5.5500 -138.8000       9.6        81       136        60
OIR    2025130    131400   -5.5500 -138.8100       9.7        81       135        60
OIR    2025130    131400   -5.5500 -138.8200       9.7        81       134        60
OIR    2025130    131400   -5.5500 -138.8300       9.7        81       133        60
OIR    2025130    131400   -5.5500 -138.8400       9.7        81       133        60
OIR    2025130    131400   -5.5500 -138.8500       9.7        81       132        60
OIR    2025130    131400   -5.5500 -138.8600       9.7        81       131        60
OIR    2025130    131400   -5.5500 -138.8700       9.7        81       131        60
OIR    2025130    131400   -5.5500 -138.8800       9.7        81       131        60
OIR    2025130    131400   -5.5500 -138.8900       9.6        81       131        60
OIR    2025130    131400   -5.5500 -138.9000       9.6        81       132        60
OIR    2025130    131400   -5.5500 -138.9100       9.6        81       132        60
OIR    2025130    131400   -5.5500 -138.9200       9.5        81       134        60
OIR    2025130    131400   -5.5500 -138.9300       9.4        82       135        60
OIR    2025130    131400   -5.5500 -138.9400       9.3        82       136        60
OIR    2025130    131400   -5.5500 -138.9500       9.0        82       135        60
OIR    2025130    131400   -5.5500 -138.9600       8.8        83       136        60
OIR    2025130    131400   -5.5500 -138.9700       8.7        84       139        60
OIR    2025130    131400   -5.5500 -138.9800       8.6        85       143        60
OIR    2025130    131400   -5.5500 -139.0200       8.0        89       146        60
OIR    2025130    131400   -5.5500 -139.0300       4.7        86       142        60
OIR    2025130    131400   -5.5600 -138.1000      14.3        77       144        60
OIR    2025130    131400   -5.5600 -138.1100      14.3        78       138        60
OIR    2025130    131400   -5.5600 -138.1200      14.3        78       137        60
OIR    2025130    131400   -5.5600 -138.1300      14.3        78       137        60
OIR    2025130    131400   -5.5600 -138.1400      14.2        79       138        60
OIR    2025130    131400   -5.5600 -138.1500      14.2        79       137        60
OIR    2025130    131400   -5.5600 -138.1600      14.1        79       136        60
OIR    2025130    131400   -5.5600 -138.1700      14.1        79       136        60
OIR    2025130    131400   -5.5600 -138.1800      14.1        79       137        60
OIR    2025130    131400   -5.5600 -138.1900      14.1        79       138        60
OIR    2025130    131400   -5.5600 -138.2000      14.1        79       138        60
OIR    2025130    131400   -5.5600 -138.2100      14.0        79       138        60
OIR    2025130    131400   -5.5600 -138.2200      13.8        79       135        60
OIR    2025130    131400   -5.5600 -138.2300      13.6        80       132        60
OIR    2025130    131400   -5.5600 -138.2400      13.3        80       130        60
OIR    2025130    131400   -5.5600 -138.2500      13.0        80       129        60
OIR    2025130    131400   -5.5600 -138.2600      12.7        80       130        60
OIR    2025130    131400   -5.5600 -138.2700      12.3        80       130        60
OIR    2025130    131400   -5.5600 -138.2800      11.9        81       127        60
OIR    2025130    131400   -5.5600 -138.2900      11.5        81       125        60
OIR    2025130    131400   -5.5600 -138.3000      11.2        82       125        60
OIR    2025130    131400   -5.5600 -138.3100      10.7        82       124        60
OIR    2025130    131400   -5.5600 -138.3200      10.0        82       123        60
OIR    2025130    131400   -5.5600 -138.3300       9.3        82       124        60
OIR    2025130    131400   -5.5600 -138.3400       8.6        83       126        60
OIR    2025130    131400   -5.5600 -138.3500       7.0        83       127        60
OIR    2025130    131400   -5.5600 -138.3600       5.3        84       129        60
OIR    2025130    131400   -5.5600 -138.3700       5.1        85       125        60
OIR    2025130    131400   -5.5600 -138.3800       5.2        85       122        60
OIR    2025130    131400   -5.5600 -138.3900       5.0        83       119        60
OIR    2025130    131400   -5.5600 -138.4000       5.1        82       120        60
OIR    2025130    131400   -5.5600 -138.5100       4.2        76       123        60
OIR    2025130    131400   -5.5600 -138.5200       6.4        76       125        60
OIR    2025130    131400   -5.5600 -138.5300       8.0        78       125        60
OIR    2025130    131400   -5.5600 -138.5400       8.5        79       125        60
OIR    2025130    131400   -5.5600 -138.5500       8.7        79       124        60
OIR    2025130    131400   -5.5600 -138.5600       8.9        79       123        60
OIR    2025130    131400   -5.5600 -138.5700       9.0        80       124        60
OIR    2025130    131400   -5.5600 -138.5800       9.2        80       125        60
OIR    2025130    131400   -5.5600 -138.5900       9.3        80       126        60
OIR    2025130    131400   -5.5600 -138.6000       9.5        80       126        60
OIR    2025130    131400   -5.5600 -138.6100       9.5        80       129        60
OIR    2025130    131400   -5.5600 -138.6200       9.5        80       130        60
OIR    2025130    131400   -5.5600 -138.6300       9.6        80       130        60
OIR    2025130    131400   -5.5600 -138.6400       9.6        80       131        60
OIR    2025130    131400   -5.5600 -138.6500       9.6        80       132        60
OIR    2025130    131400   -5.5600 -138.6600       9.6        80       133        60
OIR    2025130    131400   -5.5600 -138.6700       9.6        80       133        60
OIR    2025130    131400   -5.5600 -138.6800       9.6        80       136        60
OIR    2025130    131400   -5.5600 -138.6900       9.6        80       137        60
OIR    2025130    131400   -5.5600 -138.7000       9.6        80       137        60
OIR    2025130    131400   -5.5600 -138.7100       9.6        80       136        60
OIR    2025130    131400   -5.5600 -138.7200       9.6        80       135        60
OIR    2025130    131400   -5.5600 -138.7300       9.6        80       135        60
OIR    2025130    131400   -5.5600 -138.7400       9.6        80       137        60
OIR    2025130    131400   -5.5600 -138.7500       9.6        80       137        60
OIR    2025130    131400   -5.5600 -138.7600       9.6        80       137        60
OIR    2025130    131400   -5.5600 -138.7700       9.6        80       135        60
OIR    2025130    131400   -5.5600 -138.7800       9.6        80       134        60
OIR    2025130    131400   -5.5600 -138.7900       9.6        80       134        60
OIR    2025130    131400   -5.5600 -138.8000       9.7        80       134        60
OIR    2025130    131400   -5.5600 -138.8100       9.7        81       134        60
OIR    2025130    131400   -5.5600 -138.8200       9.7        81       133        60
OIR    2025130    131400   -5.5600 -138.8300       9.7        81       133        60
OIR    2025130    131400   -5.5600 -138.8400       9.7        81       132        60
OIR    2025130    131400   -5.5600 -138.8500       9.7        81       132        60
OIR    2025130    131400   -5.5600 -138.8600       9.7        81       132        60
OIR    2025130    131400   -5.5600 -138.8700       9.7        81       131        60
OIR    2025130    131400   -5.5600 -138.8800       9.7        81       131        60
OIR    2025130    131400   -5.5600 -138.8900       9.7        81       131        60
OIR    2025130    131400   -5.5600 -138.9000       9.7        81       131        60
OIR    2025130    131400   -5.5600 -138.9100       9.6        81       132        60
OIR    2025130    131400   -5.5600 -138.9200       9.5        81       133        60
OIR    2025130    131400   -5.5600 -138.9300       9.4        81       134        60
OIR    2025130    131400   -5.5600 -138.9400       9.3        81       134        60
OIR    2025130    131400   -5.5600 -138.9500       9.0        82       133        60
OIR    2025130    131400   -5.5600 -138.9600       8.8        82       135        60
OIR    2025130    131400   -5.5600 -138.9700       8.6        83       139        60
OIR    2025130    131400   -5.5600 -138.9800       8.5        84       143        60
OIR    2025130    131400   -5.5600 -138.9900       8.5        85       148        60
OIR    2025130    131400   -5.5600 -139.0200       7.6        87       146        60
OIR    2025130    131400   -5.5700 -138.1000      14.4        76       144        60
OIR    2025130    131400   -5.5700 -138.1100      14.4        77       139        60
OIR    2025130    131400   -5.5700 -138.1200      14.4        77       138        60
OIR    2025130    131400   -5.5700 -138.1300      14.3        78       138        60
OIR    2025130    131400   -5.5700 -138.1400      14.3        78       139        60
OIR    2025130    131400   -5.5700 -138.1500      14.2        78       138        60
OIR    2025130    131400   -5.5700 -138.1600      14.2        78       138        60
OIR    2025130    131400   -5.5700 -138.1700      14.1        78       139        60
OIR    2025130    131400   -5.5700 -138.1800      14.1        78       139        60
OIR    2025130    131400   -5.5700 -138.1900      14.2        78       140        60
OIR    2025130    131400   -5.5700 -138.2000      14.2        78       140        60
OIR    2025130    131400   -5.5700 -138.2100      14.2        78       137        60
OIR    2025130    131400   -5.5700 -138.2200      14.1        78       134        60
OIR    2025130    131400   -5.5700 -138.2300      13.9        78       131        60
OIR    2025130    131400   -5.5700 -138.2400      13.6        78       130        60
OIR    2025130    131400   -5.5700 -138.2500      13.3        78       130        60
OIR    2025130    131400   -5.5700 -138.2600      12.9        78       130        60
OIR    2025130    131400   -5.5700 -138.2700      12.4        78       129        60
OIR    2025130    131400   -5.5700 -138.2800      12.0        79       128        60
OIR    2025130    131400   -5.5700 -138.2900      11.6        79       126        60
OIR    2025130    131400   -5.5700 -138.3000      11.2        80       125        60
OIR    2025130    131400   -5.5700 -138.3100      10.7        80       124        60
OIR    2025130    131400   -5.5700 -138.3200      10.1        80       123        60
OIR    2025130    131400   -5.5700 -138.3300       9.4        80       123        60
OIR    2025130    131400   -5.5700 -138.3400       8.8        80       124        60
OIR    2025130    131400   -5.5700 -138.3500       7.6        79       126        60
OIR    2025130    131400   -5.5700 -138.3600       6.0        79       128        60
OIR    2025130    131400   -5.5700 -138.3700       5.6        80       124        60
OIR    2025130    131400   -5.5700 -138.3800       5.8        80       121        60
OIR    2025130    131400   -5.5700 -138.3900       5.7        78       117        60
OIR    2025130    131400   -5.5700 -138.4000       5.9        77       119        60
OIR    2025130    131400   -5.5700 -138.4100       4.9        74       123        60
OIR    2025130    131400   -5.5700 -138.5100       4.1        70       123        60
OIR    2025130    131400   -5.5700 -138.5200       6.4        73       124        60
OIR    2025130    131400   -5.5700 -138.5300       8.1        77       123        60
OIR    2025130    131400   -5.5700 -138.5400       8.5        78       122        60
OIR    2025130    131400   -5.5700 -138.5500       8.7        78       123        60
OIR    2025130    131400   -5.5700 -138.5600       8.9        79       123        60
OIR    2025130    131400   -5.5700 -138.5700       9.0        79       124        60
OIR    2025130    131400   -5.5700 -138.5800       9.2        79       125        60
OIR    2025130    131400   -5.5700 -138.5900       9.4        79       126        60
OIR    2025130    131400   -5.5700 -138.6000       9.5        80       127        60
OIR    2025130    131400   -5.5700 -138.6100       9.5        80       129        60
OIR    2025130    131400   -5.5700 -138.6200       9.6        80       130        60
OIR    2025130    131400   -5.5700 -138.6300       9.6        80       132        60
OIR    2025130    131400   -5.5700 -138.6400       9.6        80       133        60
OIR    2025130    131400   -5.5700 -138.6500       9.6        80       133        60
OIR    2025130    131400   -5.5700 -138.6600       9.6        80       133        60
OIR    2025130    131400   -5.5700 -138.6700       9.6        80       134        60
OIR    2025130    131400   -5.5700 -138.6800       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.6900       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7000       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7100       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7200       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7300       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7400       9.6        80       136        60
OIR    2025130    131400   -5.5700 -138.7500       9.6        80       135        60
OIR    2025130    131400   -5.5700 -138.7600       9.6        80       134        60
OIR    2025130    131400   -5.5700 -138.7700       9.6        80       134        60
OIR    2025130    131400   -5.5700 -138.7800       9.7        80       133        60
OIR    2025130    131400   -5.5700 -138.7900       9.7        80       133        60
OIR    2025130    131400   -5.5700 -138.8000       9.7        80       133        60
OIR    2025130    131400   -5.5700 -138.8100       9.7        80       133        60
OIR    2025130    131400   -5.5700 -138.8200       9.7        80       134        60
OIR    2025130    131400   -5.5700 -138.8300       9.7        81       134        60
OIR    2025130    131400   -5.5700 -138.8400       9.7        81       133        60
OIR    2025130    131400   -5.5700 -138.8500       9.7        81       133        60
OIR    2025130    131400   -5.5700 -138.8600       9.7        81       132        60
OIR    2025130    131400   -5.5700 -138.8700       9.7        81       131        60
OIR    2025130    131400   -5.5700 -138.8800       9.7        81       129        60
OIR    2025130    131400   -5.5700 -138.8900       9.7        81       129        60
OIR    2025130    131400   -5.5700 -138.9000       9.7        81       130        60
OIR    2025130    131400   -5.5700 -138.9100       9.6        81       131        60
OIR    2025130    131400   -5.5700 -138.9200       9.6        81       132        60
OIR    2025130    131400   -5.5700 -138.9300       9.5        81       133        60
OIR    2025130    131400   -5.5700 -138.9400       9.3        81       134        60
OIR    2025130    131400   -5.5700 -138.9500       9.0        81       135        60
OIR    2025130    131400   -5.5700 -138.9600       8.8        82       138        60
OIR    2025130    131400   -5.5700 -138.9700       8.6        82       143        60
OIR    2025130    131400   -5.5700 -138.9800       8.5        83       147        60
OIR    2025130    131400   -5.5800 -138.1000      14.4        75       147        60
OIR    2025130    131400   -5.5800 -138.1100      14.5        76       142        60
OIR    2025130    131400   -5.5800 -138.1200      14.5        76       140        60
OIR    2025130    131400   -5.5800 -138.1300      14.5        76       139        60
OIR    2025130    131400   -5.5800 -138.1400      14.4        77       140        60
OIR    2025130    131400   -5.5800 -138.1500      14.3        77       140        60
OIR    2025130    131400   -5.5800 -138.1600      14.2        77       140        60
OIR    2025130    131400   -5.5800 -138.1700      14.2        77       140        60
OIR    2025130    131400   -5.5800 -138.1800      14.2        76       140        60
OIR    2025130    131400   -5.5800 -138.1900      14.3        76       141        60
OIR    2025130    131400   -5.5800 -138.2000      14.4        76       140        60
OIR    2025130    131400   -5.5800 -138.2100      14.4        76       137        60
OIR    2025130    131400   -5.5800 -138.2200      14.3        76       134        60
OIR    2025130    131400   -5.5800 -138.2300      14.1        76       130        60
OIR    2025130    131400   -5.5800 -138.2400      13.9        76       130        60
OIR    2025130    131400   -5.5800 -138.2500      13.6        76       131        60
OIR    2025130    131400   -5.5800 -138.2600      13.2        76       130        60
OIR    2025130    131400   -5.5800 -138.2700      12.7        76       129        60
OIR    2025130    131400   -5.5800 -138.2800      12.2        76       129        60
OIR    2025130    131400   -5.5800 -138.2900      11.8        77       128        60
OIR    2025130    131400   -5.5800 -138.3000      11.3        77       126        60
OIR    2025130    131400   -5.5800 -138.3100      10.8        77       124        60
OIR    2025130    131400   -5.5800 -138.3200      10.2        77       123        60
OIR    2025130    131400   -5.5800 -138.3300       9.7        77       123        60
OIR    2025130    131400   -5.5800 -138.3400       9.2        77       123        60
OIR    2025130    131400   -5.5800 -138.3500       8.3        76       124        60
OIR    2025130    131400   -5.5800 -138.3600       7.1        75       126        60
OIR    2025130    131400   -5.5800 -138.3700       6.5        76       123        60
OIR    2025130    131400   -5.5800 -138.3800       6.8        76       120        60
OIR    2025130    131400   -5.5800 -138.3900       6.8        73       117        60
OIR    2025130    131400   -5.5800 -138.4000       7.2        72       120        60
OIR    2025130    131400   -5.5800 -138.4100       6.7        70       124        60
OIR    2025130    131400   -5.5800 -138.4200       4.6        69       124        60
OIR    2025130    131400   -5.5800 -138.5100       4.5        64       124        60
OIR    2025130    131400   -5.5800 -138.5200       6.6        71       124        60
OIR    2025130    131400   -5.5800 -138.5300       8.2        75       123        60
OIR    2025130    131400   -5.5800 -138.5400       8.5        76       121        60
OIR    2025130    131400   -5.5800 -138.5500       8.7        77       122        60
OIR    2025130    131400   -5.5800 -138.5600       8.9        78       124        60
OIR    2025130    131400   -5.5800 -138.5700       9.1        78       125        60
OIR    2025130    131400   -5.5800 -138.5800       9.3        79       126        60
OIR    2025130    131400   -5.5800 -138.5900       9.4        79       127        60
OIR    2025130    131400   -5.5800 -138.6000       9.5        79       128        60
OIR    2025130    131400   -5.5800 -138.6100       9.6        79       129        60
OIR    2025130    131400   -5.5800 -138.6200       9.6        80       131        60
OIR    2025130    131400   -5.5800 -138.6300       9.6        80       133        60
OIR    2025130    131400   -5.5800 -138.6400       9.6        80       134        60
OIR    2025130    131400   -5.5800 -138.6500       9.6        80       134        60
OIR    2025130    131400   -5.5800 -138.6600       9.6        80       134        60
OIR    2025130    131400   -5.5800 -138.6700       9.6        80       134        60
OIR    2025130    131400   -5.5800 -138.6800       9.6        80       136        60
OIR    2025130    131400   -5.5800 -138.6900       9.6        80       136        60
OIR    2025130    131400   -5.5800 -138.7000       9.6        80       136        60
OIR    2025130    131400   -5.5800 -138.7100       9.6        80       136        60
OIR    2025130    131400   -5.5800 -138.7200       9.6        80       137        60
OIR    2025130    131400   -5.5800 -138.7300       9.6        80       136        60
OIR    2025130    131400   -5.5800 -138.7400       9.6        80       135        60
OIR    2025130    131400   -5.5800 -138.7500       9.6        80       134        60
OIR    2025130    131400   -5.5800 -138.7600       9.6        80       133        60
OIR    2025130    131400   -5.5800 -138.7700       9.6        80       133        60
OIR    2025130    131400   -5.5800 -138.7800       9.7        80       132        60
OIR    2025130    131400   -5.5800 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.5800 -138.8000       9.7        80       132        60
OIR    2025130    131400   -5.5800 -138.8100       9.8        80       133        60
OIR    2025130    131400   -5.5800 -138.8200       9.8        80       134        60
OIR    2025130    131400   -5.5800 -138.8300       9.8        80       135        60
OIR    2025130    131400   -5.5800 -138.8400       9.8        81       134        60
OIR    2025130    131400   -5.5800 -138.8500       9.8        81       133        60
OIR    2025130    131400   -5.5800 -138.8600       9.8        81       133        60
OIR    2025130    131400   -5.5800 -138.8700       9.7        81       131        60
OIR    2025130    131400   -5.5800 -138.8800       9.7        81       129        60
OIR    2025130    131400   -5.5800 -138.8900       9.7        81       129        60
OIR    2025130    131400   -5.5800 -138.9000       9.7        81       129        60
OIR    2025130    131400   -5.5800 -138.9100       9.7        81       131        60
OIR    2025130    131400   -5.5800 -138.9200       9.6        81       132        60
OIR    2025130    131400   -5.5800 -138.9300       9.5        81       133        60
OIR    2025130    131400   -5.5800 -138.9400       9.3        81       135        60
OIR    2025130    131400   -5.5800 -138.9500       9.0        81       136        60
OIR    2025130    131400   -5.5800 -138.9600       8.9        81       140        60
OIR    2025130    131400   -5.5800 -138.9700       8.6        82       144        60
OIR    2025130    131400   -5.5800 -138.9800       8.5        82       148        60
OIR    2025130    131400   -5.5900 -138.1200      14.6        74       143        60
OIR    2025130    131400   -5.5900 -138.1300      14.6        74       141        60
OIR    2025130    131400   -5.5900 -138.1400      14.5        74       141        60
OIR    2025130    131400   -5.5900 -138.1500      14.5        74       141        60
OIR    2025130    131400   -5.5900 -138.1600      14.5        73       141        60
OIR    2025130    131400   -5.5900 -138.1700      14.4        73       141        60
OIR    2025130    131400   -5.5900 -138.1800      14.4        73       140        60
OIR    2025130    131400   -5.5900 -138.1900      14.5        73       140        60
OIR    2025130    131400   -5.5900 -138.2000      14.6        72       139        60
OIR    2025130    131400   -5.5900 -138.2100      14.6        72       136        60
OIR    2025130    131400   -5.5900 -138.2200      14.5        73       133        60
OIR    2025130    131400   -5.5900 -138.2300      14.4        74       131        60
OIR    2025130    131400   -5.5900 -138.2400      14.2        74       130        60
OIR    2025130    131400   -5.5900 -138.2500      13.9        74       131        60
OIR    2025130    131400   -5.5900 -138.2600      13.5        74       130        60
OIR    2025130    131400   -5.5900 -138.2700      13.0        74       129        60
OIR    2025130    131400   -5.5900 -138.2800      12.5        74       130        60
OIR    2025130    131400   -5.5900 -138.2900      12.0        74       131        60
OIR    2025130    131400   -5.5900 -138.3000      11.6        75       128        60
OIR    2025130    131400   -5.5900 -138.3100      11.1        75       125        60
OIR    2025130    131400   -5.5900 -138.3200      10.6        75       123        60
OIR    2025130    131400   -5.5900 -138.3300      10.1        74       122        60
OIR    2025130    131400   -5.5900 -138.3400       9.7        74       122        60
OIR    2025130    131400   -5.5900 -138.3500       9.3        73       122        60
OIR    2025130    131400   -5.5900 -138.3600       8.6        72       123        60
OIR    2025130    131400   -5.5900 -138.3700       8.3        71       120        60
OIR    2025130    131400   -5.5900 -138.3800       8.6        71       119        60
OIR    2025130    131400   -5.5900 -138.3900       9.0        68       121        60
OIR    2025130    131400   -5.5900 -138.4000       9.7        68       123        60
OIR    2025130    131400   -5.5900 -138.4100      10.0        67       125        60
OIR    2025130    131400   -5.5900 -138.4200       9.4        66       126        60
OIR    2025130    131400   -5.5900 -138.4300       6.4        65       125        60
OIR    2025130    131400   -5.5900 -138.4400       4.8        64       120        60
OIR    2025130    131400   -5.5900 -138.4500       4.5        59       114        60
OIR    2025130    131400   -5.5900 -138.4600       4.7        53       112        60
OIR    2025130    131400   -5.5900 -138.4700       4.4        53       110        60
OIR    2025130    131400   -5.5900 -138.4800       4.2        56       115        60
OIR    2025130    131400   -5.5900 -138.4900       4.3        58       120        60
OIR    2025130    131400   -5.5900 -138.5000       4.6        57       125        60
OIR    2025130    131400   -5.5900 -138.5100       5.2        61       126        60
OIR    2025130    131400   -5.5900 -138.5200       7.2        70       125        60
OIR    2025130    131400   -5.5900 -138.5300       8.4        74       123        60
OIR    2025130    131400   -5.5900 -138.5400       8.6        75       121        60
OIR    2025130    131400   -5.5900 -138.5500       8.8        76       123        60
OIR    2025130    131400   -5.5900 -138.5600       9.0        77       126        60
OIR    2025130    131400   -5.5900 -138.5700       9.1        77       128        60
OIR    2025130    131400   -5.5900 -138.5800       9.3        78       129        60
OIR    2025130    131400   -5.5900 -138.5900       9.5        79       129        60
OIR    2025130    131400   -5.5900 -138.6000       9.5        79       129        60
OIR    2025130    131400   -5.5900 -138.6100       9.6        79       129        60
OIR    2025130    131400   -5.5900 -138.6200       9.6        79       131        60
OIR    2025130    131400   -5.5900 -138.6300       9.6        79       133        60
OIR    2025130    131400   -5.5900 -138.6400       9.6        80       133        60
OIR    2025130    131400   -5.5900 -138.6500       9.6        80       134        60
OIR    2025130    131400   -5.5900 -138.6600       9.6        80       134        60
OIR    2025130    131400   -5.5900 -138.6700       9.6        80       134        60
OIR    2025130    131400   -5.5900 -138.6800       9.6        80       136        60
OIR    2025130    131400   -5.5900 -138.6900       9.6        80       137        60
OIR    2025130    131400   -5.5900 -138.7000       9.6        80       136        60
OIR    2025130    131400   -5.5900 -138.7100       9.6        80       136        60
OIR    2025130    131400   -5.5900 -138.7200       9.6        80       136        60
OIR    2025130    131400   -5.5900 -138.7300       9.6        80       136        60
OIR    2025130    131400   -5.5900 -138.7400       9.6        80       135        60
OIR    2025130    131400   -5.5900 -138.7500       9.6        80       133        60
OIR    2025130    131400   -5.5900 -138.7600       9.6        80       132        60
OIR    2025130    131400   -5.5900 -138.7700       9.7        80       132        60
OIR    2025130    131400   -5.5900 -138.7800       9.7        80       132        60
OIR    2025130    131400   -5.5900 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.5900 -138.8000       9.8        80       132        60
OIR    2025130    131400   -5.5900 -138.8100       9.8        80       132        60
OIR    2025130    131400   -5.5900 -138.8200       9.8        80       135        60
OIR    2025130    131400   -5.5900 -138.8300       9.8        80       137        60
OIR    2025130    131400   -5.5900 -138.8400       9.8        80       135        60
OIR    2025130    131400   -5.5900 -138.8500       9.8        80       134        60
OIR    2025130    131400   -5.5900 -138.8600       9.8        80       134        60
OIR    2025130    131400   -5.5900 -138.8700       9.8        81       133        60
OIR    2025130    131400   -5.5900 -138.8800       9.8        81       130        60
OIR    2025130    131400   -5.5900 -138.8900       9.8        81       130        60
OIR    2025130    131400   -5.5900 -138.9000       9.7        81       131        60
OIR    2025130    131400   -5.5900 -138.9100       9.7        81       133        60
OIR    2025130    131400   -5.5900 -138.9200       9.7        81       134        60
OIR    2025130    131400   -5.5900 -138.9300       9.6        81       136        60
OIR    2025130    131400   -5.5900 -138.9400       9.4        81       137        60
OIR    2025130    131400   -5.5900 -138.9500       9.1        81       137        60
OIR    2025130    131400   -5.5900 -138.9600       8.9        81       139        60
OIR    2025130    131400   -5.5900 -138.9700       8.7        81       143        60
OIR    2025130    131400   -5.5900 -138.9800       8.5        81       146        60
OIR    2025130    131400   -5.6000 -138.1200      14.8        70       144        60
OIR    2025130    131400   -5.6000 -138.1300      14.8        70       142        60
OIR    2025130    131400   -5.6000 -138.1400      14.8        70       142        60
OIR    2025130    131400   -5.6000 -138.1500      14.8        70       142        60
OIR    2025130    131400   -5.6000 -138.1600      14.8        69       142        60
OIR    2025130    131400   -5.6000 -138.1700      14.8        69       141        60
OIR    2025130    131400   -5.6000 -138.1800      14.8        69       139        60
OIR    2025130    131400   -5.6000 -138.1900      14.8        69       139        60
OIR    2025130    131400   -5.6000 -138.2000      14.8        69       137        60
OIR    2025130    131400   -5.6000 -138.2100      14.9        69       135        60
OIR    2025130    131400   -5.6000 -138.2200      14.9        69       133        60
OIR    2025130    131400   -5.6000 -138.2300      14.8        70       131        60
OIR    2025130    131400   -5.6000 -138.2400      14.7        70       131        60
OIR    2025130    131400   -5.6000 -138.2500      14.5        71       131        60
OIR    2025130    131400   -5.6000 -138.2600      14.1        72       130        60
OIR    2025130    131400   -5.6000 -138.2700      13.6        72       130        60
OIR    2025130    131400   -5.6000 -138.2800      13.0        72       131        60
OIR    2025130    131400   -5.6000 -138.2900      12.4        73       132        60
OIR    2025130    131400   -5.6000 -138.3000      12.0        72       129        60
OIR    2025130    131400   -5.6000 -138.3100      11.7        72       126        60
OIR    2025130    131400   -5.6000 -138.3200      11.3        72       124        60
OIR    2025130    131400   -5.6000 -138.3300      10.7        72       122        60
OIR    2025130    131400   -5.6000 -138.3400      10.4        71       122        60
OIR    2025130    131400   -5.6000 -138.3500      10.3        70       121        60
OIR    2025130    131400   -5.6000 -138.3600      10.3        68       121        60
OIR    2025130    131400   -5.6000 -138.3700      10.3        67       119        60
OIR    2025130    131400   -5.6000 -138.3800      10.6        67       117        60
OIR    2025130    131400   -5.6000 -138.3900      11.0        66       122        60
OIR    2025130    131400   -5.6000 -138.4000      11.5        66       124        60
OIR    2025130    131400   -5.6000 -138.4100      11.8        65       126        60
OIR    2025130    131400   -5.6000 -138.4200      12.0        64       127        60
OIR    2025130    131400   -5.6000 -138.4300      11.5        62       128        60
OIR    2025130    131400   -5.6000 -138.4400       8.5        57       124        60
OIR    2025130    131400   -5.6000 -138.4500       6.8        53       119        60
OIR    2025130    131400   -5.6000 -138.4600       6.1        51       116        60
OIR    2025130    131400   -5.6000 -138.4700       5.5        51       116        60
OIR    2025130    131400   -5.6000 -138.4800       5.1        53       119        60
OIR    2025130    131400   -5.6000 -138.4900       5.2        53       122        60
OIR    2025130    131400   -5.6000 -138.5000       5.5        55       127        60
OIR    2025130    131400   -5.6000 -138.5100       6.4        62       127        60
OIR    2025130    131400   -5.6000 -138.5200       7.9        70       126        60
OIR    2025130    131400   -5.6000 -138.5300       8.6        73       124        60
OIR    2025130    131400   -5.6000 -138.5400       8.8        74       122        60
OIR    2025130    131400   -5.6000 -138.5500       8.9        75       124        60
OIR    2025130    131400   -5.6000 -138.5600       9.0        76       126        60
OIR    2025130    131400   -5.6000 -138.5700       9.2        76       128        60
OIR    2025130    131400   -5.6000 -138.5800       9.4        77       129        60
OIR    2025130    131400   -5.6000 -138.5900       9.5        78       130        60
OIR    2025130    131400   -5.6000 -138.6000       9.6        78       130        60
OIR    2025130    131400   -5.6000 -138.6100       9.6        79       130        60
OIR    2025130    131400   -5.6000 -138.6200       9.6        79       131        60
OIR    2025130    131400   -5.6000 -138.6300       9.6        79       132        60
OIR    2025130    131400   -5.6000 -138.6400       9.6        79       133        60
OIR    2025130    131400   -5.6000 -138.6500       9.6        79       133        60
OIR    2025130    131400   -5.6000 -138.6600       9.6        80       133        60
OIR    2025130    131400   -5.6000 -138.6700       9.6        80       133        60
OIR    2025130    131400   -5.6000 -138.6800       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.6900       9.6        80       136        60
OIR    2025130    131400   -5.6000 -138.7000       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.7100       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.7200       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.7300       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.7400       9.6        80       135        60
OIR    2025130    131400   -5.6000 -138.7500       9.6        80       133        60
OIR    2025130    131400   -5.6000 -138.7600       9.7        80       133        60
OIR    2025130    131400   -5.6000 -138.7700       9.7        80       133        60
OIR    2025130    131400   -5.6000 -138.7800       9.7        80       132        60
OIR    2025130    131400   -5.6000 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.6000 -138.8000       9.8        80       132        60
OIR    2025130    131400   -5.6000 -138.8100       9.8        80       132        60
OIR    2025130    131400   -5.6000 -138.8200       9.8        80       135        60
OIR    2025130    131400   -5.6000 -138.8300       9.8        80       138        60
OIR    2025130    131400   -5.6000 -138.8400       9.9        80       137        60
OIR    2025130    131400   -5.6000 -138.8500       9.9        80       136        60
OIR    2025130    131400   -5.6000 -138.8600       9.8        80       136        60
OIR    2025130    131400   -5.6000 -138.8700       9.8        80       135        60
OIR    2025130    131400   -5.6000 -138.8800       9.8        80       132        60
OIR    2025130    131400   -5.6000 -138.8900       9.8        80       131        60
OIR    2025130    131400   -5.6000 -138.9000       9.8        80       132        60
OIR    2025130    131400   -5.6000 -138.9100       9.7        81       133        60
OIR    2025130    131400   -5.6000 -138.9200       9.7        81       135        60
OIR    2025130    131400   -5.6000 -138.9300       9.7        81       136        60
OIR    2025130    131400   -5.6000 -138.9400       9.5        81       137        60
OIR    2025130    131400   -5.6000 -138.9500       9.1        81       137        60
OIR    2025130    131400   -5.6000 -138.9600       9.0        81       139        60
OIR    2025130    131400   -5.6000 -138.9700       8.7        80       141        60
OIR    2025130    131400   -5.6000 -138.9800       8.5        80       144        60
OIR    2025130    131400   -5.6100 -138.1200      14.9        69       144        60
OIR    2025130    131400   -5.6100 -138.1300      14.9        69       143        60
OIR    2025130    131400   -5.6100 -138.1400      14.9        69       142        60
OIR    2025130    131400   -5.6100 -138.1500      14.9        68       142        60
OIR    2025130    131400   -5.6100 -138.1600      14.9        68       141        60
OIR    2025130    131400   -5.6100 -138.1700      14.9        68       140        60
OIR    2025130    131400   -5.6100 -138.1800      14.9        68       138        60
OIR    2025130    131400   -5.6100 -138.1900      14.9        68       137        60
OIR    2025130    131400   -5.6100 -138.2000      14.9        68       135        60
OIR    2025130    131400   -5.6100 -138.2100      15.0        68       133        60
OIR    2025130    131400   -5.6100 -138.2200      15.0        68       132        60
OIR    2025130    131400   -5.6100 -138.2300      14.9        69       132        60
OIR    2025130    131400   -5.6100 -138.2400      14.9        69       131        60
OIR    2025130    131400   -5.6100 -138.2500      14.8        69       130        60
OIR    2025130    131400   -5.6100 -138.2600      14.6        69       131        60
OIR    2025130    131400   -5.6100 -138.2700      14.3        70       131        60
OIR    2025130    131400   -5.6100 -138.2800      13.9        70       131        60
OIR    2025130    131400   -5.6100 -138.2900      13.2        70       130        60
OIR    2025130    131400   -5.6100 -138.3000      12.6        71       129        60
OIR    2025130    131400   -5.6100 -138.3100      12.1        71       127        60
OIR    2025130    131400   -5.6100 -138.3200      11.9        70       125        60
OIR    2025130    131400   -5.6100 -138.3300      11.6        70       123        60
OIR    2025130    131400   -5.6100 -138.3400      11.1        69       122        60
OIR    2025130    131400   -5.6100 -138.3500      11.0        68       121        60
OIR    2025130    131400   -5.6100 -138.3600      11.2        67       120        60
OIR    2025130    131400   -5.6100 -138.3700      11.3        66       117        60
OIR    2025130    131400   -5.6100 -138.3800      11.6        66       117        60
OIR    2025130    131400   -5.6100 -138.3900      11.8        65       121        60
OIR    2025130    131400   -5.6100 -138.4000      12.0        65       124        60
OIR    2025130    131400   -5.6100 -138.4100      12.0        64       126        60
OIR    2025130    131400   -5.6100 -138.4200      12.1        64       127        60
OIR    2025130    131400   -5.6100 -138.4300      12.0        63       127        60
OIR    2025130    131400   -5.6100 -138.4400      11.1        59       126        60
OIR    2025130    131400   -5.6100 -138.4500       9.6        54       124        60
OIR    2025130    131400   -5.6100 -138.4600       8.4        52       123        60
OIR    2025130    131400   -5.6100 -138.4700       7.6        51       121        60
OIR    2025130    131400   -5.6100 -138.4800       7.3        50       122        60
OIR    2025130    131400   -5.6100 -138.4900       7.0        53       124        60
OIR    2025130    131400   -5.6100 -138.5000       7.1        58       126        60
OIR    2025130    131400   -5.6100 -138.5100       7.8        65       127        60
OIR    2025130    131400   -5.6100 -138.5200       8.6        71       126        60
OIR    2025130    131400   -5.6100 -138.5300       8.8        73       125        60
OIR    2025130    131400   -5.6100 -138.5400       8.9        74       123        60
OIR    2025130    131400   -5.6100 -138.5500       9.0        74       124        60
OIR    2025130    131400   -5.6100 -138.5600       9.1        75       126        60
OIR    2025130    131400   -5.6100 -138.5700       9.3        75       127        60
OIR    2025130    131400   -5.6100 -138.5800       9.4        76       128        60
OIR    2025130    131400   -5.6100 -138.5900       9.5        77       129        60
OIR    2025130    131400   -5.6100 -138.6000       9.6        78       130        60
OIR    2025130    131400   -5.6100 -138.6100       9.7        78       130        60
OIR    2025130    131400   -5.6100 -138.6200       9.7        79       130        60
OIR    2025130    131400   -5.6100 -138.6300       9.6        79       132        60
OIR    2025130    131400   -5.6100 -138.6400       9.6        79       132        60
OIR    2025130    131400   -5.6100 -138.6500       9.6        79       132        60
OIR    2025130    131400   -5.6100 -138.6600       9.6        79       131        60
OIR    2025130    131400   -5.6100 -138.6700       9.6        79       131        60
OIR    2025130    131400   -5.6100 -138.6800       9.6        80       133        60
OIR    2025130    131400   -5.6100 -138.6900       9.6        80       134        60
OIR    2025130    131400   -5.6100 -138.7000       9.6        80       132        60
OIR    2025130    131400   -5.6100 -138.7100       9.6        80       133        60
OIR    2025130    131400   -5.6100 -138.7200       9.6        80       134        60
OIR    2025130    131400   -5.6100 -138.7300       9.6        80       135        60
OIR    2025130    131400   -5.6100 -138.7400       9.7        80       135        60
OIR    2025130    131400   -5.6100 -138.7500       9.7        80       135        60
OIR    2025130    131400   -5.6100 -138.7600       9.7        80       134        60
OIR    2025130    131400   -5.6100 -138.7700       9.7        80       133        60
OIR    2025130    131400   -5.6100 -138.7800       9.7        80       133        60
OIR    2025130    131400   -5.6100 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.6100 -138.8000       9.8        80       132        60
OIR    2025130    131400   -5.6100 -138.8100       9.8        80       132        60
OIR    2025130    131400   -5.6100 -138.8200       9.8        80       134        60
OIR    2025130    131400   -5.6100 -138.8300       9.8        80       136        60
OIR    2025130    131400   -5.6100 -138.8400       9.9        80       138        60
OIR    2025130    131400   -5.6100 -138.8500       9.9        80       140        60
OIR    2025130    131400   -5.6100 -138.8600       9.9        80       137        60
OIR    2025130    131400   -5.6100 -138.8700       9.8        80       135        60
OIR    2025130    131400   -5.6100 -138.8800       9.8        80       134        60
OIR    2025130    131400   -5.6100 -138.8900       9.8        80       132        60
OIR    2025130    131400   -5.6100 -138.9000       9.8        80       131        60
OIR    2025130    131400   -5.6100 -138.9100       9.8        80       131        60
OIR    2025130    131400   -5.6100 -138.9200       9.7        80       133        60
OIR    2025130    131400   -5.6100 -138.9300       9.7        81       135        60
OIR    2025130    131400   -5.6100 -138.9400       9.6        81       137        60
OIR    2025130    131400   -5.6100 -138.9500       9.2        80       138        60
OIR    2025130    131400   -5.6100 -138.9600       9.0        80       138        60
OIR    2025130    131400   -5.6100 -138.9700       8.7        79       138        60
OIR    2025130    131400   -5.6100 -138.9800       8.2        78       143        60
OIR    2025130    131400   -5.6200 -138.1100      14.9        69       147        60
OIR    2025130    131400   -5.6200 -138.1200      14.9        68       147        60
OIR    2025130    131400   -5.6200 -138.1300      14.9        68       145        60
OIR    2025130    131400   -5.6200 -138.1400      14.9        68       143        60
OIR    2025130    131400   -5.6200 -138.1500      14.9        68       141        60
OIR    2025130    131400   -5.6200 -138.1600      15.0        68       140        60
OIR    2025130    131400   -5.6200 -138.1700      14.9        68       138        60
OIR    2025130    131400   -5.6200 -138.1800      14.9        68       136        60
OIR    2025130    131400   -5.6200 -138.1900      15.0        68       135        60
OIR    2025130    131400   -5.6200 -138.2000      15.0        68       133        60
OIR    2025130    131400   -5.6200 -138.2100      15.0        68       132        60
OIR    2025130    131400   -5.6200 -138.2200      15.0        68       132        60
OIR    2025130    131400   -5.6200 -138.2300      15.0        68       132        60
OIR    2025130    131400   -5.6200 -138.2400      15.0        68       132        60
OIR    2025130    131400   -5.6200 -138.2500      15.0        68       132        60
OIR    2025130    131400   -5.6200 -138.2600      14.9        68       132        60
OIR    2025130    131400   -5.6200 -138.2700      14.7        68       132        60
OIR    2025130    131400   -5.6200 -138.2800      14.6        68       131        60
OIR    2025130    131400   -5.6200 -138.2900      14.2        68       130        60
OIR    2025130    131400   -5.6200 -138.3000      13.4        69       130        60
OIR    2025130    131400   -5.6200 -138.3100      12.8        69       129        60
OIR    2025130    131400   -5.6200 -138.3200      12.3        69       126        60
OIR    2025130    131400   -5.6200 -138.3300      12.1        69       124        60
OIR    2025130    131400   -5.6200 -138.3400      11.7        68       123        60
OIR    2025130    131400   -5.6200 -138.3500      11.7        67       122        60
OIR    2025130    131400   -5.6200 -138.3600      11.8        66       121        60
OIR    2025130    131400   -5.6200 -138.3700      11.9        65       120        60
OIR    2025130    131400   -5.6200 -138.3800      12.0        65       120        60
OIR    2025130    131400   -5.6200 -138.3900      12.1        65       123        60
OIR    2025130    131400   -5.6200 -138.4000      12.1        64       125        60
OIR    2025130    131400   -5.6200 -138.4100      12.1        64       126        60
OIR    2025130    131400   -5.6200 -138.4200      12.1        64       127        60
OIR    2025130    131400   -5.6200 -138.4300      12.1        63       127        60
OIR    2025130    131400   -5.6200 -138.4400      11.8        61       127        60
OIR    2025130    131400   -5.6200 -138.4500      10.9        58       127        60
OIR    2025130    131400   -5.6200 -138.4600      10.1        56       126        60
OIR    2025130    131400   -5.6200 -138.4700       9.4        55       125        60
OIR    2025130    131400   -5.6200 -138.4800       8.9        56       125        60
OIR    2025130    131400   -5.6200 -138.4900       8.6        58       125        60
OIR    2025130    131400   -5.6200 -138.5000       8.6        63       126        60
OIR    2025130    131400   -5.6200 -138.5100       8.8        68       127        60
OIR    2025130    131400   -5.6200 -138.5200       9.0        70       127        60
OIR    2025130    131400   -5.6200 -138.5300       9.1        72       126        60
OIR    2025130    131400   -5.6200 -138.5400       9.1        73       125        60
OIR    2025130    131400   -5.6200 -138.5500       9.2        74       126        60
OIR    2025130    131400   -5.6200 -138.5600       9.2        74       127        60
OIR    2025130    131400   -5.6200 -138.5700       9.4        74       127        60
OIR    2025130    131400   -5.6200 -138.5800       9.5        75       127        60
OIR    2025130    131400   -5.6200 -138.5900       9.6        76       129        60
OIR    2025130    131400   -5.6200 -138.6000       9.7        77       130        60
OIR    2025130    131400   -5.6200 -138.6100       9.7        77       129        60
OIR    2025130    131400   -5.6200 -138.6200       9.7        78       130        60
OIR    2025130    131400   -5.6200 -138.6300       9.7        78       131        60
OIR    2025130    131400   -5.6200 -138.6400       9.7        78       131        60
OIR    2025130    131400   -5.6200 -138.6500       9.7        79       131        60
OIR    2025130    131400   -5.6200 -138.6600       9.6        79       130        60
OIR    2025130    131400   -5.6200 -138.6700       9.6        79       129        60
OIR    2025130    131400   -5.6200 -138.6800       9.6        79       132        60
OIR    2025130    131400   -5.6200 -138.6900       9.6        79       133        60
OIR    2025130    131400   -5.6200 -138.7000       9.7        80       132        60
OIR    2025130    131400   -5.6200 -138.7100       9.7        80       133        60
OIR    2025130    131400   -5.6200 -138.7200       9.7        80       133        60
OIR    2025130    131400   -5.6200 -138.7300       9.7        80       134        60
OIR    2025130    131400   -5.6200 -138.7400       9.7        80       136        60
OIR    2025130    131400   -5.6200 -138.7500       9.7        80       136        60
OIR    2025130    131400   -5.6200 -138.7600       9.7        80       135        60
OIR    2025130    131400   -5.6200 -138.7700       9.7        80       133        60
OIR    2025130    131400   -5.6200 -138.7800       9.7        80       132        60
OIR    2025130    131400   -5.6200 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.6200 -138.8000       9.8        80       132        60
OIR    2025130    131400   -5.6200 -138.8100       9.8        80       132        60
OIR    2025130    131400   -5.6200 -138.8200       9.8        80       134        60
OIR    2025130    131400   -5.6200 -138.8300       9.8        80       137        60
OIR    2025130    131400   -5.6200 -138.8400       9.9        80       141        60
OIR    2025130    131400   -5.6200 -138.8500       9.9        80       144        60
OIR    2025130    131400   -5.6200 -138.8600       9.9        80       144        60
OIR    2025130    131400   -5.6200 -138.8700       9.8        80       142        60
OIR    2025130    131400   -5.6200 -138.8800       9.8        80       136        60
OIR    2025130    131400   -5.6200 -138.8900       9.8        80       134        60
OIR    2025130    131400   -5.6200 -138.9000       9.8        80       134        60
OIR    2025130    131400   -5.6200 -138.9100       9.8        80       133        60
OIR    2025130    131400   -5.6200 -138.9200       9.8        80       133        60
OIR    2025130    131400   -5.6200 -138.9300       9.7        80       134        60
OIR    2025130    131400   -5.6200 -138.9400       9.6        80       135        60
OIR    2025130    131400   -5.6200 -138.9500       9.3        80       136        60
OIR    2025130    131400   -5.6200 -138.9600       8.9        79       136        60
OIR    2025130    131400   -5.6200 -138.9700       8.4        77       136        60
OIR    2025130    131400   -5.6200 -138.9800       7.8        75       141        60
OIR    2025130    131400   -5.6300 -138.1100      14.9        68       146        60
OIR    2025130    131400   -5.6300 -138.1400      15.0        68       143        60
OIR    2025130    131400   -5.6300 -138.1500      15.0        68       141        60
OIR    2025130    131400   -5.6300 -138.1600      15.0        68       139        60
OIR    2025130    131400   -5.6300 -138.1700      15.0        68       136        60
OIR    2025130    131400   -5.6300 -138.1800      15.0        68       134        60
OIR    2025130    131400   -5.6300 -138.1900      15.0        68       133        60
OIR    2025130    131400   -5.6300 -138.2000      15.0        68       133        60
OIR    2025130    131400   -5.6300 -138.2100      15.0        68       132        60
OIR    2025130    131400   -5.6300 -138.2200      15.1        68       131        60
OIR    2025130    131400   -5.6300 -138.2300      15.1        68       131        60
OIR    2025130    131400   -5.6300 -138.2400      15.1        68       133        60
OIR    2025130    131400   -5.6300 -138.2500      15.1        68       136        60
OIR    2025130    131400   -5.6300 -138.2600      15.0        68       134        60
OIR    2025130    131400   -5.6300 -138.2700      14.9        68       132        60
OIR    2025130    131400   -5.6300 -138.2800      14.9        67       132        60
OIR    2025130    131400   -5.6300 -138.2900      14.7        67       131        60
OIR    2025130    131400   -5.6300 -138.3000      14.5        67       132        60
OIR    2025130    131400   -5.6300 -138.3100      13.9        67       131        60
OIR    2025130    131400   -5.6300 -138.3200      13.1        68       128        60
OIR    2025130    131400   -5.6300 -138.3300      12.5        68       126        60
OIR    2025130    131400   -5.6300 -138.3400      12.2        67       124        60
OIR    2025130    131400   -5.6300 -138.3500      12.0        66       124        60
OIR    2025130    131400   -5.6300 -138.3600      12.1        65       123        60
OIR    2025130    131400   -5.6300 -138.3700      12.1        65       123        60
OIR    2025130    131400   -5.6300 -138.3800      12.2        65       124        60
OIR    2025130    131400   -5.6300 -138.3900      12.2        64       126        60
OIR    2025130    131400   -5.6300 -138.4000      12.2        64       127        60
OIR    2025130    131400   -5.6300 -138.4100      12.2        64       128        60
OIR    2025130    131400   -5.6300 -138.4200      12.1        64       128        60
OIR    2025130    131400   -5.6300 -138.4300      12.1        64       128        60
OIR    2025130    131400   -5.6300 -138.4400      12.0        63       129        60
OIR    2025130    131400   -5.6300 -138.4500      11.4        61       129        60
OIR    2025130    131400   -5.6300 -138.4600      10.7        60       129        60
OIR    2025130    131400   -5.6300 -138.4700      10.2        60       128        60
OIR    2025130    131400   -5.6300 -138.4800       9.8        61       126        60
OIR    2025130    131400   -5.6300 -138.4900       9.5        63       125        60
OIR    2025130    131400   -5.6300 -138.5000       9.4        66       126        60
OIR    2025130    131400   -5.6300 -138.5100       9.3        68       127        60
OIR    2025130    131400   -5.6300 -138.5200       9.3        70       128        60
OIR    2025130    131400   -5.6300 -138.5300       9.3        71       128        60
OIR    2025130    131400   -5.6300 -138.5400       9.3        72       128        60
OIR    2025130    131400   -5.6300 -138.5500       9.3        73       128        60
OIR    2025130    131400   -5.6300 -138.5600       9.4        73       129        60
OIR    2025130    131400   -5.6300 -138.5700       9.5        73       128        60
OIR    2025130    131400   -5.6300 -138.5800       9.6        74       128        60
OIR    2025130    131400   -5.6300 -138.5900       9.7        75       129        60
OIR    2025130    131400   -5.6300 -138.6000       9.8        76       130        60
OIR    2025130    131400   -5.6300 -138.6100       9.8        76       129        60
OIR    2025130    131400   -5.6300 -138.6200       9.8        77       129        60
OIR    2025130    131400   -5.6300 -138.6300       9.7        78       130        60
OIR    2025130    131400   -5.6300 -138.6400       9.7        78       130        60
OIR    2025130    131400   -5.6300 -138.6500       9.7        78       130        60
OIR    2025130    131400   -5.6300 -138.6600       9.7        79       129        60
OIR    2025130    131400   -5.6300 -138.6700       9.7        79       129        60
OIR    2025130    131400   -5.6300 -138.6800       9.7        79       131        60
OIR    2025130    131400   -5.6300 -138.6900       9.7        79       133        60
OIR    2025130    131400   -5.6300 -138.7000       9.7        79       134        60
OIR    2025130    131400   -5.6300 -138.7100       9.7        80       134        60
OIR    2025130    131400   -5.6300 -138.7200       9.7        80       133        60
OIR    2025130    131400   -5.6300 -138.7300       9.7        80       135        60
OIR    2025130    131400   -5.6300 -138.7400       9.7        80       137        60
OIR    2025130    131400   -5.6300 -138.7500       9.7        80       137        60
OIR    2025130    131400   -5.6300 -138.7600       9.7        80       136        60
OIR    2025130    131400   -5.6300 -138.7700       9.7        80       133        60
OIR    2025130    131400   -5.6300 -138.7800       9.7        80       132        60
OIR    2025130    131400   -5.6300 -138.7900       9.7        80       132        60
OIR    2025130    131400   -5.6300 -138.8000       9.8        80       132        60
OIR    2025130    131400   -5.6300 -138.8100       9.8        80       132        60
OIR    2025130    131400   -5.6300 -138.8200       9.8        80       135        60
OIR    2025130    131400   -5.6300 -138.8300       9.8        80       139        60
OIR    2025130    131400   -5.6300 -138.8400       9.9        80       144        60
OIR    2025130    131400   -5.6300 -138.8800       9.8        80       139        60
OIR    2025130    131400   -5.6300 -138.8900       9.8        80       137        60
OIR    2025130    131400   -5.6300 -138.9000       9.8        80       137        60
OIR    2025130    131400   -5.6300 -138.9100       9.8        80       136        60
OIR    2025130    131400   -5.6300 -138.9200       9.8        80       134        60
OIR    2025130    131400   -5.6300 -138.9300       9.7        80       133        60
OIR    2025130    131400   -5.6300 -138.9400       9.6        80       133        60
OIR    2025130    131400   -5.6300 -138.9500       9.2        80       134        60
OIR    2025130    131400   -5.6300 -138.9600       8.5        78       134        60
OIR    2025130    131400   -5.6300 -138.9700       7.7        74       134        60
OIR    2025130    131400   -5.6300 -138.9800       6.9        71       139        60
OIR    2025130    131400   -5.6400 -138.1100      14.9        68       144        60
OIR    2025130    131400   -5.6400 -138.1200      15.0        68       146        60
OIR    2025130    131400   -5.6400 -138.1300      15.0        68       145        60
OIR    2025130    131400   -5.6400 -138.1400      15.0        68       142        60
OIR    2025130    131400   -5.6400 -138.1500      15.0        68       140        60
OIR    2025130    131400   -5.6400 -138.1600      15.0        68       139        60
OIR    2025130    131400   -5.6400 -138.1700      15.0        68       136        60
OIR    2025130    131400   -5.6400 -138.1800      15.0        68       133        60
OIR    2025130    131400   -5.6400 -138.1900      15.1        67       134        60
OIR    2025130    131400   -5.6400 -138.2000      15.1        67       134        60
OIR    2025130    131400   -5.6400 -138.2100      15.1        67       133        60
OIR    2025130    131400   -5.6400 -138.2200      15.1        67       133        60
OIR    2025130    131400   -5.6400 -138.2300      15.1        67       132        60
OIR    2025130    131400   -5.6400 -138.2400      15.1        67       133        60
OIR    2025130    131400   -5.6400 -138.2500      15.1        67       135        60
OIR    2025130    131400   -5.6400 -138.2600      15.1        67       133        60
OIR    2025130    131400   -5.6400 -138.2700      15.1        67       132        60
OIR    2025130    131400   -5.6400 -138.2800      15.0        67       131        60
OIR    2025130    131400   -5.6400 -138.2900      14.9        67       130        60
OIR    2025130    131400   -5.6400 -138.3000      14.8        67       131        60
OIR    2025130    131400   -5.6400 -138.3100      14.6        67       130        60
OIR    2025130    131400   -5.6400 -138.3200      14.2        67       127        60
OIR    2025130    131400   -5.6400 -138.3300      13.5        67       126        60
OIR    2025130    131400   -5.6400 -138.3400      12.8        66       125        60
OIR    2025130    131400   -5.6400 -138.3500      12.5        66       125        60
OIR    2025130    131400   -5.6400 -138.3600      12.4        65       125        60
OIR    2025130    131400   -5.6400 -138.3700      12.3        65       126        60
OIR    2025130    131400   -5.6400 -138.3800      12.3        65       127        60
OIR    2025130    131400   -5.6400 -138.3900      12.3        64       128        60
OIR    2025130    131400   -5.6400 -138.4000      12.3        64       128        60
OIR    2025130    131400   -5.6400 -138.4100      12.2        64       129        60
OIR    2025130    131400   -5.6400 -138.4200      12.2        64       129        60
OIR    2025130    131400   -5.6400 -138.4300      12.1        64       128        60
OIR    2025130    131400   -5.6400 -138.4400      12.0        64       129        60
OIR    2025130    131400   -5.6400 -138.4500      11.6        63       130        60
OIR    2025130    131400   -5.6400 -138.4600      11.1        63       129        60
OIR    2025130    131400   -5.6400 -138.4700      10.6        63       128        60
OIR    2025130    131400   -5.6400 -138.4800      10.2        64       127        60
OIR    2025130    131400   -5.6400 -138.4900      10.0        65       126        60
OIR    2025130    131400   -5.6400 -138.5000       9.8        67       126        60
OIR    2025130    131400   -5.6400 -138.5100       9.6        69       127        60
OIR    2025130    131400   -5.6400 -138.5200       9.5        70       128        60
OIR    2025130    131400   -5.6400 -138.5300       9.4        71       129        60
OIR    2025130    131400   -5.6400 -138.5400       9.4        72       129        60
OIR    2025130    131400   -5.6400 -138.5500       9.5        72       130        60
OIR    2025130    131400   -5.6400 -138.5600       9.5        72       130        60
OIR    2025130    131400   -5.6400 -138.5700       9.6        73       128        60
OIR    2025130    131400   -5.6400 -138.5800       9.7        73       127        60
OIR    2025130    131400   -5.6400 -138.5900       9.8        74       128        60
OIR    2025130    131400   -5.6400 -138.6000       9.8        75       128        60
OIR    2025130    131400   -5.6400 -138.6100       9.8        76       128        60
OIR    2025130    131400   -5.6400 -138.6200       9.8        76       129        60
OIR    2025130    131400   -5.6400 -138.6300       9.7        77       129        60
OIR    2025130    131400   -5.6400 -138.6400       9.7        77       129        60
OIR    2025130    131400   -5.6400 -138.6500       9.7        78       129        60
OIR    2025130    131400   -5.6400 -138.6600       9.7        78       129        60
OIR    2025130    131400   -5.6400 -138.6700       9.7        79       129        60
OIR    2025130    131400   -5.6400 -138.6800       9.7        79       131        60
OIR    2025130    131400   -5.6400 -138.6900       9.7        79       133        60
OIR    2025130    131400   -5.6400 -138.7000       9.7        79       134        60
OIR    2025130    131400   -5.6400 -138.7100       9.7        79       134        60
OIR    2025130    131400   -5.6400 -138.7200       9.7        80       134        60
OIR    2025130    131400   -5.6400 -138.7300       9.7        80       135        60
OIR    2025130    131400   -5.6400 -138.7400       9.7        80       137        60
OIR    2025130    131400   -5.6400 -138.7500       9.7        80       137        60
OIR    2025130    131400   -5.6400 -138.7600       9.7        80       136        60
OIR    2025130    131400   -5.6400 -138.7700       9.7        80       134        60
OIR    2025130    131400   -5.6400 -138.7800       9.7        80       133        60
OIR    2025130    131400   -5.6400 -138.7900       9.7        80       133        60
OIR    2025130    131400   -5.6400 -138.8000       9.8        80       133        60
OIR    2025130    131400   -5.6400 -138.8100       9.8        80       134        60
OIR    2025130    131400   -5.6400 -138.8200       9.8        80       138        60
OIR    2025130    131400   -5.6400 -138.8300       9.8        80       142        60
OIR    2025130    131400   -5.6400 -138.8400       9.8        80       146        60
OIR    2025130    131400   -5.6400 -138.8800       9.8        80       145        60
OIR    2025130    131400   -5.6400 -138.8900       9.8        80       144        60
OIR    2025130    131400   -5.6400 -138.9000       9.8        80       144        60
OIR    2025130    131400   -5.6400 -138.9100       9.8        80       141        60
OIR    2025130    131400   -5.6400 -138.9200       9.8        80       134        60
OIR    2025130    131400   -5.6400 -138.9300       9.8        80       133        60
OIR    2025130    131400   -5.6400 -138.9400       9.6        80       133        60
OIR    2025130    131400   -5.6400 -138.9500       8.8        79       133        60
OIR    2025130    131400   -5.6400 -138.9600       7.5        76       134        60
OIR    2025130    131400   -5.6400 -138.9700       6.6        72       135        60
OIR    2025130    131400   -5.6400 -138.9800       5.7        67       139        60
OIR    2025130    131400   -5.6500 -138.1000      14.9        68       146        60
OIR    2025130    131400   -5.6500 -138.1100      15.0        68       143        60
OIR    2025130    131400   -5.6500 -138.1200      15.0        68       140        60
OIR    2025130    131400   -5.6500 -138.1300      15.0        68       139        60
OIR    2025130    131400   -5.6500 -138.1400      15.0        68       140        60
OIR    2025130    131400   -5.6500 -138.1500      15.0        68       140        60
OIR    2025130    131400   -5.6500 -138.1600      15.1        67       139        60
OIR    2025130    131400   -5.6500 -138.1700      15.1        67       136        60
OIR    2025130    131400   -5.6500 -138.1800      15.1        67       133        60
OIR    2025130    131400   -5.6500 -138.1900      15.1        67       135        60
OIR    2025130    131400   -5.6500 -138.2000      15.1        67       136        60
OIR    2025130    131400   -5.6500 -138.2100      15.1        67       135        60
OIR    2025130    131400   -5.6500 -138.2200      15.1        67       134        60
OIR    2025130    131400   -5.6500 -138.2300      15.1        67       133        60
OIR    2025130    131400   -5.6500 -138.2400      15.1        67       133        60
OIR    2025130    131400   -5.6500 -138.2500      15.1        67       133        60
OIR    2025130    131400   -5.6500 -138.2600      15.1        67       132        60
OIR    2025130    131400   -5.6500 -138.2700      15.1        67       132        60
OIR    2025130    131400   -5.6500 -138.2800      15.1        67       130        60
OIR    2025130    131400   -5.6500 -138.2900      15.0        67       129        60
OIR    2025130    131400   -5.6500 -138.3000      15.0        67       129        60
OIR    2025130    131400   -5.6500 -138.3100      14.9        67       128        60
OIR    2025130    131400   -5.6500 -138.3200      14.8        66       126        60
OIR    2025130    131400   -5.6500 -138.3300      14.4        66       125        60
OIR    2025130    131400   -5.6500 -138.3400      13.9        67       125        60
OIR    2025130    131400   -5.6500 -138.3500      13.3        66       126        60
OIR    2025130    131400   -5.6500 -138.3600      12.9        66       127        60
OIR    2025130    131400   -5.6500 -138.3700      12.7        65       129        60
OIR    2025130    131400   -5.6500 -138.3800      12.5        65       130        60
OIR    2025130    131400   -5.6500 -138.3900      12.4        64       129        60
OIR    2025130    131400   -5.6500 -138.4000      12.4        64       129        60
OIR    2025130    131400   -5.6500 -138.4100      12.3        64       129        60
OIR    2025130    131400   -5.6500 -138.4200      12.3        64       129        60
OIR    2025130    131400   -5.6500 -138.4300      12.2        64       129        60
OIR    2025130    131400   -5.6500 -138.4400      12.1        64       130        60
OIR    2025130    131400   -5.6500 -138.4500      11.7        64       131        60
OIR    2025130    131400   -5.6500 -138.4600      11.4        64       130        60
OIR    2025130    131400   -5.6500 -138.4700      10.9        64       129        60
OIR    2025130    131400   -5.6500 -138.4800      10.5        65       128        60
OIR    2025130    131400   -5.6500 -138.4900      10.2        66       127        60
OIR    2025130    131400   -5.6500 -138.5000      10.0        67       127        60
OIR    2025130    131400   -5.6500 -138.5100       9.8        69       127        60
OIR    2025130    131400   -5.6500 -138.5200       9.7        70       128        60
OIR    2025130    131400   -5.6500 -138.5300       9.6        71       129        60
OIR    2025130    131400   -5.6500 -138.5400       9.6        71       130        60
OIR    2025130    131400   -5.6500 -138.5500       9.6        72       131        60
OIR    2025130    131400   -5.6500 -138.5600       9.6        72       131        60
OIR    2025130    131400   -5.6500 -138.5700       9.6        72       128        60
OIR    2025130    131400   -5.6500 -138.5800       9.7        73       127        60
OIR    2025130    131400   -5.6500 -138.5900       9.8        74       126        60
OIR    2025130    131400   -5.6500 -138.6000       9.8        74       126        60
OIR    2025130    131400   -5.6500 -138.6100       9.8        75       127        60
OIR    2025130    131400   -5.6500 -138.6200       9.9        76       128        60
OIR    2025130    131400   -5.6500 -138.6300       9.8        76       129        60
OIR    2025130    131400   -5.6500 -138.6400       9.8        77       128        60
OIR    2025130    131400   -5.6500 -138.6500       9.8        77       128        60
OIR    2025130    131400   -5.6500 -138.6600       9.7        78       129        60
OIR    2025130    131400   -5.6500 -138.6700       9.7        78       129        60
OIR    2025130    131400   -5.6500 -138.6800       9.7        79       131        60
OIR    2025130    131400   -5.6500 -138.6900       9.7        79       133        60
OIR    2025130    131400   -5.6500 -138.7000       9.7        79       134        60
OIR    2025130    131400   -5.6500 -138.7100       9.7        79       135        60
OIR    2025130    131400   -5.6500 -138.7200       9.7        80       135        60
OIR    2025130    131400   -5.6500 -138.7300       9.7        80       136        60
OIR    2025130    131400   -5.6500 -138.7400       9.7        80       138        60
OIR    2025130    131400   -5.6500 -138.7500       9.7        80       137        60
OIR    2025130    131400   -5.6500 -138.7600       9.7        80       136        60
OIR    2025130    131400   -5.6500 -138.7700       9.7        80       135        60
OIR    2025130    131400   -5.6500 -138.7800       9.7        80       134        60
OIR    2025130    131400   -5.6500 -138.7900       9.7        80       135        60
OIR    2025130    131400   -5.6500 -138.8000       9.8        80       135        60
OIR    2025130    131400   -5.6500 -138.8100       9.8        80       135        60
OIR    2025130    131400   -5.6500 -138.8200       9.8        80       141        60
OIR    2025130    131400   -5.6500 -138.8300       9.8        80       146        60
OIR    2025130    131400   -5.6500 -138.8400       9.8        80       149        60
OIR    2025130    131400   -5.6500 -138.9100       9.8        80       146        60
OIR    2025130    131400   -5.6500 -138.9200       9.8        80       135        60
OIR    2025130    131400   -5.6500 -138.9300       9.8        80       134        60
OIR    2025130    131400   -5.6500 -138.9400       9.4        80       133        60
OIR    2025130    131400   -5.6500 -138.9500       7.5        77       133        60
OIR    2025130    131400   -5.6500 -138.9600       5.6        73       134        60
OIR    2025130    131400   -5.6500 -138.9700       4.8        68       135        60
OIR    2025130    131400   -5.6600 -138.1000      15.0        68       144        60
OIR    2025130    131400   -5.6600 -138.1100      15.0        68       140        60
OIR    2025130    131400   -5.6600 -138.1200      15.1        68       137        60
OIR    2025130    131400   -5.6600 -138.1300      15.1        67       136        60
OIR    2025130    131400   -5.6600 -138.1400      15.1        67       138        60
OIR    2025130    131400   -5.6600 -138.1500      15.1        67       139        60
OIR    2025130    131400   -5.6600 -138.1600      15.1        67       139        60
OIR    2025130    131400   -5.6600 -138.1700      15.1        67       137        60
OIR    2025130    131400   -5.6600 -138.1800      15.1        67       135        60
OIR    2025130    131400   -5.6600 -138.1900      15.1        67       135        60
OIR    2025130    131400   -5.6600 -138.2000      15.1        67       134        60
OIR    2025130    131400   -5.6600 -138.2100      15.1        67       134        60
OIR    2025130    131400   -5.6600 -138.2200      15.2        67       134        60
OIR    2025130    131400   -5.6600 -138.2300      15.2        67       133        60
OIR    2025130    131400   -5.6600 -138.2400      15.2        67       133        60
OIR    2025130    131400   -5.6600 -138.2500      15.2        67       133        60
OIR    2025130    131400   -5.6600 -138.2600      15.2        67       133        60
OIR    2025130    131400   -5.6600 -138.2700      15.2        67       132        60
OIR    2025130    131400   -5.6600 -138.2800      15.1        67       131        60
OIR    2025130    131400   -5.6600 -138.2900      15.1        67       130        60
OIR    2025130    131400   -5.6600 -138.3000      15.1        66       131        60
OIR    2025130    131400   -5.6600 -138.3100      15.1        66       131        60
OIR    2025130    131400   -5.6600 -138.3200      15.1        66       129        60
OIR    2025130    131400   -5.6600 -138.3300      14.9        66       129        60
OIR    2025130    131400   -5.6600 -138.3400      14.6        67       129        60
OIR    2025130    131400   -5.6600 -138.3500      14.1        67       129        60
OIR    2025130    131400   -5.6600 -138.3600      13.7        66       129        60
OIR    2025130    131400   -5.6600 -138.3700      13.4        66       130        60
OIR    2025130    131400   -5.6600 -138.3800      13.1        65       131        60
OIR    2025130    131400   -5.6600 -138.3900      12.9        64       131        60
OIR    2025130    131400   -5.6600 -138.4000      12.7        64       130        60
OIR    2025130    131400   -5.6600 -138.4100      12.5        64       130        60
OIR    2025130    131400   -5.6600 -138.4200      12.4        64       130        60
OIR    2025130    131400   -5.6600 -138.4300      12.3        64       130        60
OIR    2025130    131400   -5.6600 -138.4400      12.2        64       130        60
OIR    2025130    131400   -5.6600 -138.4500      11.9        65       130        60
OIR    2025130    131400   -5.6600 -138.4600      11.6        65       129        60
OIR    2025130    131400   -5.6600 -138.4700      11.2        65       128        60
OIR    2025130    131400   -5.6600 -138.4800      10.8        66       127        60
OIR    2025130    131400   -5.6600 -138.4900      10.5        67       126        60
OIR    2025130    131400   -5.6600 -138.5000      10.3        68       125        60
OIR    2025130    131400   -5.6600 -138.5100      10.1        69       126        60
OIR    2025130    131400   -5.6600 -138.5200       9.9        70       128        60
OIR    2025130    131400   -5.6600 -138.5300       9.8        71       129        60
OIR    2025130    131400   -5.6600 -138.5400       9.7        71       130        60
OIR    2025130    131400   -5.6600 -138.5500       9.7        71       130        60
OIR    2025130    131400   -5.6600 -138.5600       9.7        72       130        60
OIR    2025130    131400   -5.6600 -138.5700       9.7        72       127        60
OIR    2025130    131400   -5.6600 -138.5800       9.8        73       126        60
OIR    2025130    131400   -5.6600 -138.5900       9.8        73       125        60
OIR    2025130    131400   -5.6600 -138.6000       9.9        74       125        60
OIR    2025130    131400   -5.6600 -138.6100       9.9        74       125        60
OIR    2025130    131400   -5.6600 -138.6200       9.9        75       127        60
OIR    2025130    131400   -5.6600 -138.6300       9.8        76       128        60
OIR    2025130    131400   -5.6600 -138.6400       9.8        76       128        60
OIR    2025130    131400   -5.6600 -138.6500       9.8        77       128        60
OIR    2025130    131400   -5.6600 -138.6600       9.8        77       128        60
OIR    2025130    131400   -5.6600 -138.6700       9.7        78       129        60
OIR    2025130    131400   -5.6600 -138.6800       9.7        78       131        60
OIR    2025130    131400   -5.6600 -138.6900       9.7        79       132        60
OIR    2025130    131400   -5.6600 -138.7000       9.7        79       134        60
OIR    2025130    131400   -5.6600 -138.7100       9.7        79       135        60
OIR    2025130    131400   -5.6600 -138.7200       9.7        79       135        60
OIR    2025130    131400   -5.6600 -138.7300       9.7        80       136        60
OIR    2025130    131400   -5.6600 -138.7400       9.7        80       138        60
OIR    2025130    131400   -5.6600 -138.7500       9.7        80       142        60
OIR    2025130    131400   -5.6600 -138.7600       9.7        80       142        60
OIR    2025130    131400   -5.6600 -138.7700       9.7        80       139        60
OIR    2025130    131400   -5.6600 -138.7800       9.7        80       139        60
OIR    2025130    131400   -5.6600 -138.7900       9.8        80       140        60
OIR    2025130    131400   -5.6600 -138.8000       9.8        80       141        60
OIR    2025130    131400   -5.6600 -138.8100       9.8        80       142        60
OIR    2025130    131400   -5.6600 -138.8200       9.8        80       147        60
OIR    2025130    131400   -5.6600 -138.9200       9.8        80       141        60
OIR    2025130    131400   -5.6600 -138.9300       9.8        80       136        60
OIR    2025130    131400   -5.6600 -138.9400       9.1        80       132        60
OIR    2025130    131400   -5.6600 -138.9500       5.3        74       132        60
OIR    2025130    131400   -5.6700 -138.0900      14.9        68       145        60
OIR    2025130    131400   -5.6700 -138.1000      15.0        68       141        60
OIR    2025130    131400   -5.6700 -138.1100      15.1        68       137        60
OIR    2025130    131400   -5.6700 -138.1200      15.1        67       134        60
OIR    2025130    131400   -5.6700 -138.1300      15.2        67       134        60
OIR    2025130    131400   -5.6700 -138.1400      15.2        67       136        60
OIR    2025130    131400   -5.6700 -138.1500      15.2        67       138        60
OIR    2025130    131400   -5.6700 -138.1600      15.2        67       139        60
OIR    2025130    131400   -5.6700 -138.1700      15.2        67       138        60
OIR    2025130    131400   -5.6700 -138.1800      15.2        67       138        60
OIR    2025130    131400   -5.6700 -138.1900      15.2        67       135        60
OIR    2025130    131400   -5.6700 -138.2000      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2100      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2200      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2300      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2400      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2500      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2600      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2700      15.2        67       133        60
OIR    2025130    131400   -5.6700 -138.2800      15.2        67       132        60
OIR    2025130    131400   -5.6700 -138.2900      15.2        67       132        60
OIR    2025130    131400   -5.6700 -138.3000      15.2        66       133        60
OIR    2025130    131400   -5.6700 -138.3100      15.2        66       133        60
OIR    2025130    131400   -5.6700 -138.3200      15.2        66       133        60
OIR    2025130    131400   -5.6700 -138.3300      15.2        66       133        60
OIR    2025130    131400   -5.6700 -138.3400      15.1        66       132        60
OIR    2025130    131400   -5.6700 -138.3500      14.9        66       132        60
OIR    2025130    131400   -5.6700 -138.3600      14.5        66       132        60
OIR    2025130    131400   -5.6700 -138.3700      14.1        66       132        60
OIR    2025130    131400   -5.6700 -138.3800      13.8        64       132        60
OIR    2025130    131400   -5.6700 -138.3900      13.6        64       132        60
OIR    2025130    131400   -5.6700 -138.4000      13.3        63       132        60
OIR    2025130    131400   -5.6700 -138.4100      13.0        63       131        60
OIR    2025130    131400   -5.6700 -138.4200      12.7        64       131        60
OIR    2025130    131400   -5.6700 -138.4300      12.5        64       130        60
OIR    2025130    131400   -5.6700 -138.4400      12.3        65       130        60
OIR    2025130    131400   -5.6700 -138.4500      12.1        65       129        60
OIR    2025130    131400   -5.6700 -138.4600      11.8        65       128        60
OIR    2025130    131400   -5.6700 -138.4700      11.5        66       127        60
OIR    2025130    131400   -5.6700 -138.4800      11.2        66       126        60
OIR    2025130    131400   -5.6700 -138.4900      10.9        67       125        60
OIR    2025130    131400   -5.6700 -138.5000      10.7        68       124        60
OIR    2025130    131400   -5.6700 -138.5100      10.4        69       126        60
OIR    2025130    131400   -5.6700 -138.5200      10.1        70       129        60
OIR    2025130    131400   -5.6700 -138.5300       9.9        71       130        60
OIR    2025130    131400   -5.6700 -138.5400       9.8        71       130        60
OIR    2025130    131400   -5.6700 -138.5500       9.8        71       130        60
OIR    2025130    131400   -5.6700 -138.5600       9.7        72       129        60
OIR    2025130    131400   -5.6700 -138.5700       9.8        72       126        60
OIR    2025130    131400   -5.6700 -138.5800       9.8        72       125        60
OIR    2025130    131400   -5.6700 -138.5900       9.8        73       124        60
OIR    2025130    131400   -5.6700 -138.6000       9.9        73       123        60
OIR    2025130    131400   -5.6700 -138.6100       9.9        74       124        60
OIR    2025130    131400   -5.6700 -138.6200       9.9        74       125        60
OIR    2025130    131400   -5.6700 -138.6300       9.9        75       128        60
OIR    2025130    131400   -5.6700 -138.6400       9.8        76       128        60
OIR    2025130    131400   -5.6700 -138.6500       9.8        76       128        60
OIR    2025130    131400   -5.6700 -138.6600       9.8        77       128        60
OIR    2025130    131400   -5.6700 -138.6700       9.8        77       129        60
OIR    2025130    131400   -5.6700 -138.6800       9.8        78       131        60
OIR    2025130    131400   -5.6700 -138.6900       9.7        78       132        60
OIR    2025130    131400   -5.6700 -138.7000       9.7        79       134        60
OIR    2025130    131400   -5.6700 -138.7100       9.7        79       135        60
OIR    2025130    131400   -5.6700 -138.7200       9.7        79       135        60
OIR    2025130    131400   -5.6700 -138.7300       9.7        79       136        60
OIR    2025130    131400   -5.6700 -138.7400       9.7        80       138        60
OIR    2025130    131400   -5.6700 -138.7500       9.7        80       145        60
OIR    2025130    131400   -5.6700 -138.7600       9.7        80       147        60
OIR    2025130    131400   -5.6700 -138.7700       9.7        80       144        60
OIR    2025130    131400   -5.6700 -138.7800       9.7        80       144        60
OIR    2025130    131400   -5.6700 -138.7900       9.8        80       145        60
OIR    2025130    131400   -5.6700 -138.8000       9.8        80       146        60
OIR    2025130    131400   -5.6700 -138.8100       9.8        80       147        60
OIR    2025130    131400   -5.6700 -138.9200       9.8        80       146        60
OIR    2025130    131400   -5.6700 -138.9300       9.8        80       140        60
OIR    2025130    131400   -5.6700 -138.9400       8.4        77       135        60
OIR    2025130    131400   -5.6700 -138.9500       4.1        59       133        60
OIR    2025130    131400   -5.6800 -138.0900      15.0        68       145        60
OIR    2025130    131400   -5.6800 -138.1000      15.0        68       141        60
OIR    2025130    131400   -5.6800 -138.1100      15.1        67       136        60
OIR    2025130    131400   -5.6800 -138.1200      15.2        67       133        60
OIR    2025130    131400   -5.6800 -138.1300      15.2        67       132        60
OIR    2025130    131400   -5.6800 -138.1400      15.2        67       133        60
OIR    2025130    131400   -5.6800 -138.1500      15.2        67       137        60
OIR    2025130    131400   -5.6800 -138.1600      15.2        67       139        60
OIR    2025130    131400   -5.6800 -138.1700      15.2        67       139        60
OIR    2025130    131400   -5.6800 -138.1800      15.2        67       139        60
OIR    2025130    131400   -5.6800 -138.1900      15.2        67       137        60
OIR    2025130    131400   -5.6800 -138.2000      15.2        67       135        60
OIR    2025130    131400   -5.6800 -138.2100      15.2        67       134        60
OIR    2025130    131400   -5.6800 -138.2200      15.2        67       133        60
OIR    2025130    131400   -5.6800 -138.2300      15.2        67       132        60
OIR    2025130    131400   -5.6800 -138.2400      15.2        67       133        60
OIR    2025130    131400   -5.6800 -138.2500      15.2        67       134        60
OIR    2025130    131400   -5.6800 -138.2600      15.2        67       134        60
OIR    2025130    131400   -5.6800 -138.2700      15.3        67       134        60
OIR    2025130    131400   -5.6800 -138.2800      15.3        67       135        60
OIR    2025130    131400   -5.6800 -138.2900      15.2        67       136        60
OIR    2025130    131400   -5.6800 -138.3000      15.3        66       134        60
OIR    2025130    131400   -5.6800 -138.3100      15.3        66       133        60
OIR    2025130    131400   -5.6800 -138.3200      15.3        66       134        60
OIR    2025130    131400   -5.6800 -138.3300      15.3        66       134        60
OIR    2025130    131400   -5.6800 -138.3400      15.3        66       133        60
OIR    2025130    131400   -5.6800 -138.3500      15.2        66       133        60
OIR    2025130    131400   -5.6800 -138.3600      15.0        66       133        60
OIR    2025130    131400   -5.6800 -138.3700      14.7        66       133        60
OIR    2025130    131400   -5.6800 -138.3800      14.4        64       133        60
OIR    2025130    131400   -5.6800 -138.3900      14.1        63       133        60
OIR    2025130    131400   -5.6800 -138.4000      13.8        63       132        60
OIR    2025130    131400   -5.6800 -138.4100      13.5        63       132        60
OIR    2025130    131400   -5.6800 -138.4200      13.1        64       131        60
OIR    2025130    131400   -5.6800 -138.4300      12.8        64       131        60
OIR    2025130    131400   -5.6800 -138.4400      12.6        64       128        60
OIR    2025130    131400   -5.6800 -138.4500      12.4        65       126        60
OIR    2025130    131400   -5.6800 -138.4600      12.2        65       125        60
OIR    2025130    131400   -5.6800 -138.4700      12.0        66       125        60
OIR    2025130    131400   -5.6800 -138.4800      11.6        66       125        60
OIR    2025130    131400   -5.6800 -138.4900      11.3        67       125        60
OIR    2025130    131400   -5.6800 -138.5000      11.1        68       125        60
OIR    2025130    131400   -5.6800 -138.5100      10.8        69       126        60
OIR    2025130    131400   -5.6800 -138.5200      10.5        70       129        60
OIR    2025130    131400   -5.6800 -138.5300      10.1        71       129        60
OIR    2025130    131400   -5.6800 -138.5400       9.9        71       130        60
OIR    2025130    131400   -5.6800 -138.5500       9.8        71       129        60
OIR    2025130    131400   -5.6800 -138.5600       9.8        72       127        60
OIR    2025130    131400   -5.6800 -138.5700       9.8        72       126        60
OIR    2025130    131400   -5.6800 -138.5800       9.8        72       124        60
OIR    2025130    131400   -5.6800 -138.5900       9.9        73       124        60
OIR    2025130    131400   -5.6800 -138.6000       9.9        73       123        60
OIR    2025130    131400   -5.6800 -138.6100       9.9        73       123        60
OIR    2025130    131400   -5.6800 -138.6200      10.0        74       124        60
OIR    2025130    131400   -5.6800 -138.6300       9.9        75       126        60
OIR    2025130    131400   -5.6800 -138.6400       9.9        75       128        60
OIR    2025130    131400   -5.6800 -138.6500       9.9        76       129        60
OIR    2025130    131400   -5.6800 -138.6600       9.9        76       130        60
OIR    2025130    131400   -5.6800 -138.6700       9.9        77       130        60
OIR    2025130    131400   -5.6800 -138.6800       9.8        78       131        60
OIR    2025130    131400   -5.6800 -138.6900       9.8        78       133        60
OIR    2025130    131400   -5.6800 -138.7000       9.8        78       136        60
OIR    2025130    131400   -5.6800 -138.7100       9.8        79       135        60
OIR    2025130    131400   -5.6800 -138.7200       9.8        79       134        60
OIR    2025130    131400   -5.6800 -138.7300       9.8        79       134        60
OIR    2025130    131400   -5.6800 -138.7400       9.8        80       136        60
OIR    2025130    131400   -5.6800 -138.7500       9.8        80       145        60
OIR    2025130    131400   -5.6800 -138.7700       9.7        80       148        60
OIR    2025130    131400   -5.6800 -138.7800       9.7        80       147        60
OIR    2025130    131400   -5.6800 -138.7900       9.8        80       147        60
OIR    2025130    131400   -5.6800 -138.8000       9.8        80       148        60
OIR    2025130    131400   -5.6800 -138.9300       9.4        78       147        60
OIR    2025130    131400   -5.6800 -138.9400       6.5        51       143        60
OIR    2025130    131400   -5.6800 -138.9500       6.0        17       136        60
OIR    2025130    131400   -5.6800 -138.9600       6.5         5       133        60
OIR    2025130    131400   -5.6800 -138.9700       6.7       359       133        60
OIR    2025130    131400   -5.6800 -138.9800       6.0       355       135        60
OIR    2025130    131400   -5.6800 -138.9900       5.9       353       141        60
OIR    2025130    131400   -5.6800 -139.0000       6.1       353       148        60
OIR    2025130    131400   -5.6900 -138.0900      15.0        68       146        60
OIR    2025130    131400   -5.6900 -138.1000      15.1        67       141        60
OIR    2025130    131400   -5.6900 -138.1100      15.2        67       137        60
OIR    2025130    131400   -5.6900 -138.1200      15.2        67       134        60
OIR    2025130    131400   -5.6900 -138.1300      15.3        67       132        60
OIR    2025130    131400   -5.6900 -138.1400      15.3        67       133        60
OIR    2025130    131400   -5.6900 -138.1500      15.3        67       136        60
OIR    2025130    131400   -5.6900 -138.1600      15.3        67       139        60
OIR    2025130    131400   -5.6900 -138.1700      15.3        67       140        60
OIR    2025130    131400   -5.6900 -138.1800      15.3        67       141        60
OIR    2025130    131400   -5.6900 -138.1900      15.3        67       139        60
OIR    2025130    131400   -5.6900 -138.2000      15.2        67       137        60
OIR    2025130    131400   -5.6900 -138.2100      15.2        67       135        60
OIR    2025130    131400   -5.6900 -138.2200      15.2        67       133        60
OIR    2025130    131400   -5.6900 -138.2300      15.3        67       132        60
OIR    2025130    131400   -5.6900 -138.2400      15.3        67       132        60
OIR    2025130    131400   -5.6900 -138.2500      15.3        67       134        60
OIR    2025130    131400   -5.6900 -138.2600      15.4        67       134        60
OIR    2025130    131400   -5.6900 -138.2700      15.4        66       135        60
OIR    2025130    131400   -5.6900 -138.2800      15.4        66       137        60
OIR    2025130    131400   -5.6900 -138.2900      15.4        66       138        60
OIR    2025130    131400   -5.6900 -138.3000      15.3        66       137        60
OIR    2025130    131400   -5.6900 -138.3100      15.3        66       137        60
OIR    2025130    131400   -5.6900 -138.3200      15.3        66       137        60
OIR    2025130    131400   -5.6900 -138.3300      15.3        66       135        60
OIR    2025130    131400   -5.6900 -138.3400      15.3        66       133        60
OIR    2025130    131400   -5.6900 -138.3500      15.3        66       133        60
OIR    2025130    131400   -5.6900 -138.3600      15.2        66       133        60
OIR    2025130    131400   -5.6900 -138.3700      15.1        65       133        60
OIR    2025130    131400   -5.6900 -138.3800      14.8        65       133        60
OIR    2025130    131400   -5.6900 -138.3900      14.5        64       132        60
OIR    2025130    131400   -5.6900 -138.4000      14.2        64       132        60
OIR    2025130    131400   -5.6900 -138.4100      13.9        64       132        60
OIR    2025130    131400   -5.6900 -138.4200      13.4        64       131        60
OIR    2025130    131400   -5.6900 -138.4300      13.0        64       130        60
OIR    2025130    131400   -5.6900 -138.4400      12.8        65       127        60
OIR    2025130    131400   -5.6900 -138.4500      12.6        65       125        60
OIR    2025130    131400   -5.6900 -138.4600      12.5        66       124        60
OIR    2025130    131400   -5.6900 -138.4700      12.3        66       124        60
OIR    2025130    131400   -5.6900 -138.4800      12.1        67       125        60
OIR    2025130    131400   -5.6900 -138.4900      11.8        68       126        60
OIR    2025130    131400   -5.6900 -138.5000      11.5        68       125        60
OIR    2025130    131400   -5.6900 -138.5100      11.2        69       127        60
OIR    2025130    131400   -5.6900 -138.5200      10.8        70       129        60
OIR    2025130    131400   -5.6900 -138.5300      10.4        71       130        60
OIR    2025130    131400   -5.6900 -138.5400      10.1        71       130        60
OIR    2025130    131400   -5.6900 -138.5500       9.9        72       129        60
OIR    2025130    131400   -5.6900 -138.5600       9.9        72       127        60
OIR    2025130    131400   -5.6900 -138.5700       9.9        72       125        60
OIR    2025130    131400   -5.6900 -138.5800       9.9        72       124        60
OIR    2025130    131400   -5.6900 -138.5900       9.9        72       124        60
OIR    2025130    131400   -5.6900 -138.6000      10.0        73       124        60
OIR    2025130    131400   -5.6900 -138.6100      10.0        73       123        60
OIR    2025130    131400   -5.6900 -138.6200      10.0        73       125        60
OIR    2025130    131400   -5.6900 -138.6300      10.0        74       127        60
OIR    2025130    131400   -5.6900 -138.6400      10.0        75       129        60
OIR    2025130    131400   -5.6900 -138.6500      10.0        75       130        60
OIR    2025130    131400   -5.6900 -138.6600       9.9        76       131        60
OIR    2025130    131400   -5.6900 -138.6700       9.9        77       131        60
OIR    2025130    131400   -5.6900 -138.6800       9.9        77       132        60
OIR    2025130    131400   -5.6900 -138.6900       9.8        78       133        60
OIR    2025130    131400   -5.6900 -138.7000       9.8        78       136        60
OIR    2025130    131400   -5.6900 -138.7100       9.8        79       135        60
OIR    2025130    131400   -5.6900 -138.7200       9.8        79       133        60
OIR    2025130    131400   -5.6900 -138.7300       9.8        79       134        60
OIR    2025130    131400   -5.6900 -138.7400       9.8        79       136        60
OIR    2025130    131400   -5.6900 -138.7500       9.8        80       145        60
OIR    2025130    131400   -5.6900 -138.7800       9.7        80       148        60
OIR    2025130    131400   -5.6900 -138.7900       9.8        80       147        60
OIR    2025130    131400   -5.6900 -138.8000       9.8        80       147        60
OIR    2025130    131400   -5.6900 -138.8100       9.8        80       148        60
OIR    2025130    131400   -5.6900 -138.9500       6.8         3       142        60
OIR    2025130    131400   -5.6900 -138.9600       6.9       359       139        60
OIR    2025130    131400   -5.6900 -138.9700       6.9       358       138        60
OIR    2025130    131400   -5.6900 -138.9800       6.7       357       139        60
OIR    2025130    131400   -5.6900 -138.9900       6.5       356       143        60
OIR    2025130    131400   -5.7000 -138.1000      15.3        67       144        60
OIR    2025130    131400   -5.7000 -138.1100      15.3        67       141        60
OIR    2025130    131400   -5.7000 -138.1200      15.3        67       137        60
OIR    2025130    131400   -5.7000 -138.1300      15.3        67       135        60
OIR    2025130    131400   -5.7000 -138.1400      15.3        67       135        60
OIR    2025130    131400   -5.7000 -138.1500      15.4        67       137        60
OIR    2025130    131400   -5.7000 -138.1600      15.4        67       139        60
OIR    2025130    131400   -5.7000 -138.1700      15.4        67       142        60
OIR    2025130    131400   -5.7000 -138.1800      15.3        67       144        60
OIR    2025130    131400   -5.7000 -138.1900      15.3        67       140        60
OIR    2025130    131400   -5.7000 -138.2000      15.3        67       137        60
OIR    2025130    131400   -5.7000 -138.2100      15.4        67       135        60
OIR    2025130    131400   -5.7000 -138.2200      15.4        67       133        60
OIR    2025130    131400   -5.7000 -138.2300      15.4        67       132        60
OIR    2025130    131400   -5.7000 -138.2400      15.4        67       132        60
OIR    2025130    131400   -5.7000 -138.2500      15.4        66       133        60
OIR    2025130    131400   -5.7000 -138.2600      15.4        66       134        60
OIR    2025130    131400   -5.7000 -138.2700      15.5        66       135        60
OIR    2025130    131400   -5.7000 -138.2800      15.5        66       137        60
OIR    2025130    131400   -5.7000 -138.2900      15.5        66       139        60
OIR    2025130    131400   -5.7000 -138.3000      15.5        66       143        60
OIR    2025130    131400   -5.7000 -138.3100      15.5        66       145        60
OIR    2025130    131400   -5.7000 -138.3200      15.4        66       142        60
OIR    2025130    131400   -5.7000 -138.3300      15.4        66       137        60
OIR    2025130    131400   -5.7000 -138.3400      15.4        66       133        60
OIR    2025130    131400   -5.7000 -138.3500      15.4        66       133        60
OIR    2025130    131400   -5.7000 -138.3600      15.3        66       132        60
OIR    2025130    131400   -5.7000 -138.3700      15.2        65       131        60
OIR    2025130    131400   -5.7000 -138.3800      15.0        65       131        60
OIR    2025130    131400   -5.7000 -138.3900      14.8        64       130        60
OIR    2025130    131400   -5.7000 -138.4000      14.5        64       130        60
OIR    2025130    131400   -5.7000 -138.4100      14.2        64       130        60
OIR    2025130    131400   -5.7000 -138.4200      13.8        64       130        60
OIR    2025130    131400   -5.7000 -138.4300      13.3        65       128        60
OIR    2025130    131400   -5.7000 -138.4400      13.0        65       127        60
OIR    2025130    131400   -5.7000 -138.4500      12.9        65       126        60
OIR    2025130    131400   -5.7000 -138.4600      12.7        66       125        60
OIR    2025130    131400   -5.7000 -138.4700      12.6        66       125        60
OIR    2025130    131400   -5.7000 -138.4800      12.5        67       126        60
OIR    2025130    131400   -5.7000 -138.4900      12.3        68       127        60
OIR    2025130    131400   -5.7000 -138.5000      12.2        68       126        60
OIR    2025130    131400   -5.7000 -138.5100      11.9        69       128        60
OIR    2025130    131400   -5.7000 -138.5200      11.5        70       130        60
OIR    2025130    131400   -5.7000 -138.5300      10.8        70       130        60
OIR    2025130    131400   -5.7000 -138.5400      10.2        71       130        60
OIR    2025130    131400   -5.7000 -138.5500      10.0        72       129        60
OIR    2025130    131400   -5.7000 -138.5600      10.0        72       128        60
OIR    2025130    131400   -5.7000 -138.5700       9.9        72       126        60
OIR    2025130    131400   -5.7000 -138.5800       9.9        72       125        60
OIR    2025130    131400   -5.7000 -138.5900      10.0        72       125        60
OIR    2025130    131400   -5.7000 -138.6000      10.0        73       125        60
OIR    2025130    131400   -5.7000 -138.6100      10.0        73       125        60
OIR    2025130    131400   -5.7000 -138.6200      10.1        73       127        60
OIR    2025130    131400   -5.7000 -138.6300      10.1        73       129        60
OIR    2025130    131400   -5.7000 -138.6400      10.1        74       130        60
OIR    2025130    131400   -5.7000 -138.6500      10.2        74       131        60
OIR    2025130    131400   -5.7000 -138.6600      10.2        74       131        60
OIR    2025130    131400   -5.7000 -138.6700      10.1        75       132        60
OIR    2025130    131400   -5.7000 -138.6800      10.0        76       132        60
OIR    2025130    131400   -5.7000 -138.6900      10.0        77       133        60
OIR    2025130    131400   -5.7000 -138.7000       9.9        78       135        60
OIR    2025130    131400   -5.7000 -138.7100       9.9        78       134        60
OIR    2025130    131400   -5.7000 -138.7200       9.8        79       134        60
OIR    2025130    131400   -5.7000 -138.7300       9.8        79       134        60
OIR    2025130    131400   -5.7000 -138.7400       9.8        79       136        60
OIR    2025130    131400   -5.7000 -138.7500       9.8        79       145        60
OIR    2025130    131400   -5.7000 -138.7700       9.7        80       148        60
OIR    2025130    131400   -5.7000 -138.7800       9.7        80       145        60
OIR    2025130    131400   -5.7000 -138.7900       9.7        80       141        60
OIR    2025130    131400   -5.7000 -138.8000       9.8        80       142        60
OIR    2025130    131400   -5.7000 -138.8100       9.8        80       146        60
OIR    2025130    131400   -5.7100 -138.1000      15.4        67       147        60
OIR    2025130    131400   -5.7100 -138.1100      15.4        67       144        60
OIR    2025130    131400   -5.7100 -138.1200      15.4        67       140        60
OIR    2025130    131400   -5.7100 -138.1300      15.4        67       138        60
OIR    2025130    131400   -5.7100 -138.1400      15.4        67       136        60
OIR    2025130    131400   -5.7100 -138.1500      15.4        67       137        60
OIR    2025130    131400   -5.7100 -138.1600      15.4        67       139        60
OIR    2025130    131400   -5.7100 -138.1700      15.4        67       142        60
OIR    2025130    131400   -5.7100 -138.1800      15.4        67       145        60
OIR    2025130    131400   -5.7100 -138.1900      15.4        67       140        60
OIR    2025130    131400   -5.7100 -138.2000      15.4        67       136        60
OIR    2025130    131400   -5.7100 -138.2100      15.4        67       134        60
OIR    2025130    131400   -5.7100 -138.2200      15.4        66       134        60
OIR    2025130    131400   -5.7100 -138.2300      15.4        66       134        60
OIR    2025130    131400   -5.7100 -138.2400      15.5        66       134        60
OIR    2025130    131400   -5.7100 -138.2500      15.5        66       133        60
OIR    2025130    131400   -5.7100 -138.2600      15.5        66       133        60
OIR    2025130    131400   -5.7100 -138.2700      15.5        66       133        60
OIR    2025130    131400   -5.7100 -138.2800      15.5        66       135        60
OIR    2025130    131400   -5.7100 -138.2900      15.5        66       138        60
OIR    2025130    131400   -5.7100 -138.3000      15.5        66       144        60
OIR    2025130    131400   -5.7100 -138.3100      15.5        66       146        60
OIR    2025130    131400   -5.7100 -138.3200      15.4        66       142        60
OIR    2025130    131400   -5.7100 -138.3300      15.4        66       137        60
OIR    2025130    131400   -5.7100 -138.3400      15.4        66       133        60
OIR    2025130    131400   -5.7100 -138.3500      15.4        66       132        60
OIR    2025130    131400   -5.7100 -138.3600      15.3        66       132        60
OIR    2025130    131400   -5.7100 -138.3700      15.3        65       130        60
OIR    2025130    131400   -5.7100 -138.3800      15.1        65       129        60
OIR    2025130    131400   -5.7100 -138.3900      15.0        65       128        60
OIR    2025130    131400   -5.7100 -138.4000      14.7        64       128        60
OIR    2025130    131400   -5.7100 -138.4100      14.4        64       129        60
OIR    2025130    131400   -5.7100 -138.4200      14.1        64       128        60
OIR    2025130    131400   -5.7100 -138.4300      13.6        65       127        60
OIR    2025130    131400   -5.7100 -138.4400      13.3        65       126        60
OIR    2025130    131400   -5.7100 -138.4500      13.1        66       126        60
OIR    2025130    131400   -5.7100 -138.4600      13.0        66       125        60
OIR    2025130    131400   -5.7100 -138.4700      12.9        67       125        60
OIR    2025130    131400   -5.7100 -138.4800      12.8        67       126        60
OIR    2025130    131400   -5.7100 -138.4900      12.7        68       126        60
OIR    2025130    131400   -5.7100 -138.5000      12.6        69       126        60
OIR    2025130    131400   -5.7100 -138.5100      12.4        69       128        60
OIR    2025130    131400   -5.7100 -138.5200      12.1        70       131        60
OIR    2025130    131400   -5.7100 -138.5300      11.4        71       130        60
OIR    2025130    131400   -5.7100 -138.5400      10.6        72       130        60
OIR    2025130    131400   -5.7100 -138.5500      10.1        72       129        60
OIR    2025130    131400   -5.7100 -138.5600      10.0        72       127        60
OIR    2025130    131400   -5.7100 -138.5700      10.0        72       125        60
OIR    2025130    131400   -5.7100 -138.5800      10.0        72       125        60
OIR    2025130    131400   -5.7100 -138.5900      10.0        72       126        60
OIR    2025130    131400   -5.7100 -138.6000      10.1        73       126        60
OIR    2025130    131400   -5.7100 -138.6100      10.1        73       126        60
OIR    2025130    131400   -5.7100 -138.6200      10.2        73       128        60
OIR    2025130    131400   -5.7100 -138.6300      10.2        73       130        60
OIR    2025130    131400   -5.7100 -138.6400      10.3        73       130        60
OIR    2025130    131400   -5.7100 -138.6500      10.3        73       131        60
OIR    2025130    131400   -5.7100 -138.6600      10.3        73       132        60
OIR    2025130    131400   -5.7100 -138.6700      10.3        74       132        60
OIR    2025130    131400   -5.7100 -138.6800      10.3        74       132        60
OIR    2025130    131400   -5.7100 -138.6900      10.2        76       133        60
OIR    2025130    131400   -5.7100 -138.7000      10.0        77       134        60
OIR    2025130    131400   -5.7100 -138.7100      10.0        78       134        60
OIR    2025130    131400   -5.7100 -138.7200       9.9        79       134        60
OIR    2025130    131400   -5.7100 -138.7300       9.8        79       135        60
OIR    2025130    131400   -5.7100 -138.7400       9.8        79       136        60
OIR    2025130    131400   -5.7100 -138.7500       9.8        79       143        60
OIR    2025130    131400   -5.7100 -138.7600       9.8        79       148        60
OIR    2025130    131400   -5.7100 -138.7800       9.7        80       145        60
OIR    2025130    131400   -5.7100 -138.7900       9.7        80       139        60
OIR    2025130    131400   -5.7100 -138.8000       9.7        80       138        60
OIR    2025130    131400   -5.7100 -138.8100       9.7        80       143        60
OIR    2025130    131400   -5.7200 -138.1100      15.6        66       146        60
OIR    2025130    131400   -5.7200 -138.1200      15.5        66       142        60
OIR    2025130    131400   -5.7200 -138.1300      15.5        67       139        60
OIR    2025130    131400   -5.7200 -138.1400      15.5        67       137        60
OIR    2025130    131400   -5.7200 -138.1500      15.4        67       139        60
OIR    2025130    131400   -5.7200 -138.1600      15.4        67       141        60
OIR    2025130    131400   -5.7200 -138.1700      15.4        67       142        60
OIR    2025130    131400   -5.7200 -138.1800      15.4        67       143        60
OIR    2025130    131400   -5.7200 -138.1900      15.4        66       138        60
OIR    2025130    131400   -5.7200 -138.2000      15.4        66       135        60
OIR    2025130    131400   -5.7200 -138.2100      15.4        66       134        60
OIR    2025130    131400   -5.7200 -138.2200      15.5        66       135        60
OIR    2025130    131400   -5.7200 -138.2300      15.5        66       136        60
OIR    2025130    131400   -5.7200 -138.2400      15.5        66       136        60
OIR    2025130    131400   -5.7200 -138.2500      15.5        66       135        60
OIR    2025130    131400   -5.7200 -138.2600      15.5        66       132        60
OIR    2025130    131400   -5.7200 -138.2700      15.5        66       130        60
OIR    2025130    131400   -5.7200 -138.2800      15.5        66       132        60
OIR    2025130    131400   -5.7200 -138.2900      15.5        66       135        60
OIR    2025130    131400   -5.7200 -138.3000      15.5        66       139        60
OIR    2025130    131400   -5.7200 -138.3100      15.5        66       141        60
OIR    2025130    131400   -5.7200 -138.3200      15.5        66       139        60
OIR    2025130    131400   -5.7200 -138.3300      15.4        66       135        60
OIR    2025130    131400   -5.7200 -138.3400      15.4        66       132        60
OIR    2025130    131400   -5.7200 -138.3500      15.4        66       132        60
OIR    2025130    131400   -5.7200 -138.3600      15.4        66       132        60
OIR    2025130    131400   -5.7200 -138.3700      15.3        66       130        60
OIR    2025130    131400   -5.7200 -138.3800      15.2        65       128        60
OIR    2025130    131400   -5.7200 -138.3900      15.1        65       127        60
OIR    2025130    131400   -5.7200 -138.4000      14.9        65       127        60
OIR    2025130    131400   -5.7200 -138.4100      14.6        65       127        60
OIR    2025130    131400   -5.7200 -138.4200      14.3        65       127        60
OIR    2025130    131400   -5.7200 -138.4300      13.9        65       126        60
OIR    2025130    131400   -5.7200 -138.4400      13.5        66       126        60
OIR    2025130    131400   -5.7200 -138.4500      13.3        66       125        60
OIR    2025130    131400   -5.7200 -138.4600      13.2        67       124        60
OIR    2025130    131400   -5.7200 -138.4700      13.1        67       124        60
OIR    2025130    131400   -5.7200 -138.4800      13.1        68       124        60
OIR    2025130    131400   -5.7200 -138.4900      13.0        68       125        60
OIR    2025130    131400   -5.7200 -138.5000      12.9        69       126        60
OIR    2025130    131400   -5.7200 -138.5100      12.8        69       128        60
OIR    2025130    131400   -5.7200 -138.5200      12.7        70       130        60
OIR    2025130    131400   -5.7200 -138.5300      12.2        71       130        60
OIR    2025130    131400   -5.7200 -138.5400      11.3        72       130        60
OIR    2025130    131400   -5.7200 -138.5500      10.4        72       127        60
OIR    2025130    131400   -5.7200 -138.5600      10.1        72       124        60
OIR    2025130    131400   -5.7200 -138.5700      10.1        72       124        60
OIR    2025130    131400   -5.7200 -138.5800      10.1        72       124        60
OIR    2025130    131400   -5.7200 -138.5900      10.1        72       125        60
OIR    2025130    131400   -5.7200 -138.6000      10.1        72       126        60
OIR    2025130    131400   -5.7200 -138.6100      10.2        73       126        60
OIR    2025130    131400   -5.7200 -138.6200      10.2        73       127        60
OIR    2025130    131400   -5.7200 -138.6300      10.3        73       128        60
OIR    2025130    131400   -5.7200 -138.6400      10.3        73       130        60
OIR    2025130    131400   -5.7200 -138.6500      10.4        73       131        60
OIR    2025130    131400   -5.7200 -138.6600      10.4        73       131        60
OIR    2025130    131400   -5.7200 -138.6700      10.4        73       131        60
OIR    2025130    131400   -5.7200 -138.6800      10.4        73       133        60
OIR    2025130    131400   -5.7200 -138.6900      10.4        74       134        60
OIR    2025130    131400   -5.7200 -138.7000      10.3        76       134        60
OIR    2025130    131400   -5.7200 -138.7100      10.1        77       133        60
OIR    2025130    131400   -5.7200 -138.7200      10.0        78       133        60
OIR    2025130    131400   -5.7200 -138.7300       9.9        79       134        60
OIR    2025130    131400   -5.7200 -138.7400       9.8        79       136        60
OIR    2025130    131400   -5.7200 -138.7500       9.8        79       141        60
OIR    2025130    131400   -5.7200 -138.7600       9.8        79       146        60
OIR    2025130    131400   -5.7200 -138.7900       9.7        80       139        60
OIR    2025130    131400   -5.7200 -138.8000       9.7        80       136        60
OIR    2025130    131400   -5.7200 -138.8100       9.7        80       138        60
OIR    2025130    131400   -5.7300 -138.1200      15.7        66       144        60
OIR    2025130    131400   -5.7300 -138.1300      15.6        66       141        60
OIR    2025130    131400   -5.7300 -138.1400      15.5        66       140        60
OIR    2025130    131400   -5.7300 -138.1500      15.5        66       143        60
OIR    2025130    131400   -5.7300 -138.1600      15.5        66       144        60
OIR    2025130    131400   -5.7300 -138.1700      15.5        66       143        60
OIR    2025130    131400   -5.7300 -138.1800      15.5        66       141        60
OIR    2025130    131400   -5.7300 -138.1900      15.5        66       138        60
OIR    2025130    131400   -5.7300 -138.2000      15.5        66       136        60
OIR    2025130    131400   -5.7300 -138.2100      15.5        66       135        60
OIR    2025130    131400   -5.7300 -138.2200      15.5        66       136        60
OIR    2025130    131400   -5.7300 -138.2300      15.5        66       138        60
OIR    2025130    131400   -5.7300 -138.2400      15.5        66       139        60
OIR    2025130    131400   -5.7300 -138.2500      15.5        66       138        60
OIR    2025130    131400   -5.7300 -138.2600      15.5        66       135        60
OIR    2025130    131400   -5.7300 -138.2700      15.5        66       134        60
OIR    2025130    131400   -5.7300 -138.2800      15.5        66       135        60
OIR    2025130    131400   -5.7300 -138.2900      15.5        66       136        60
OIR    2025130    131400   -5.7300 -138.3000      15.5        66       138        60
OIR    2025130    131400   -5.7300 -138.3100      15.5        66       138        60
OIR    2025130    131400   -5.7300 -138.3200      15.5        66       137        60
OIR    2025130    131400   -5.7300 -138.3300      15.4        66       135        60
OIR    2025130    131400   -5.7300 -138.3400      15.4        66       133        60
OIR    2025130    131400   -5.7300 -138.3500      15.4        66       132        60
OIR    2025130    131400   -5.7300 -138.3600      15.4        66       132        60
OIR    2025130    131400   -5.7300 -138.3700      15.3        66       131        60
OIR    2025130    131400   -5.7300 -138.3800      15.2        65       130        60
OIR    2025130    131400   -5.7300 -138.3900      15.1        65       128        60
OIR    2025130    131400   -5.7300 -138.4000      15.0        65       127        60
OIR    2025130    131400   -5.7300 -138.4100      14.8        65       127        60
OIR    2025130    131400   -5.7300 -138.4200      14.5        65       127        60
OIR    2025130    131400   -5.7300 -138.4300      14.1        65       127        60
OIR    2025130    131400   -5.7300 -138.4400      13.8        66       126        60
OIR    2025130    131400   -5.7300 -138.4500      13.5        67       126        60
OIR    2025130    131400   -5.7300 -138.4600      13.4        67       125        60
OIR    2025130    131400   -5.7300 -138.4700      13.3        68       125        60
OIR    2025130    131400   -5.7300 -138.4800      13.2        68       125        60
OIR    2025130    131400   -5.7300 -138.4900      13.2        69       126        60
OIR    2025130    131400   -5.7300 -138.5000      13.1        69       127        60
OIR    2025130    131400   -5.7300 -138.5100      13.1        69       129        60
OIR    2025130    131400   -5.7300 -138.5200      13.0        70       131        60
OIR    2025130    131400   -5.7300 -138.5300      12.7        71       130        60
OIR    2025130    131400   -5.7300 -138.5400      12.0        72       129        60
OIR    2025130    131400   -5.7300 -138.5500      10.8        72       127        60
OIR    2025130    131400   -5.7300 -138.5600      10.2        72       124        60
OIR    2025130    131400   -5.7300 -138.5700      10.1        72       123        60
OIR    2025130    131400   -5.7300 -138.5800      10.1        72       124        60
OIR    2025130    131400   -5.7300 -138.5900      10.1        72       126        60
OIR    2025130    131400   -5.7300 -138.6000      10.2        72       127        60
OIR    2025130    131400   -5.7300 -138.6100      10.3        72       127        60
OIR    2025130    131400   -5.7300 -138.6200      10.3        72       128        60
OIR    2025130    131400   -5.7300 -138.6300      10.4        72       128        60
OIR    2025130    131400   -5.7300 -138.6400      10.4        73       129        60
OIR    2025130    131400   -5.7300 -138.6500      10.4        73       130        60
OIR    2025130    131400   -5.7300 -138.6600      10.5        73       130        60
OIR    2025130    131400   -5.7300 -138.6700      10.5        73       131        60
OIR    2025130    131400   -5.7300 -138.6800      10.5        73       132        60
OIR    2025130    131400   -5.7300 -138.6900      10.5        73       133        60
OIR    2025130    131400   -5.7300 -138.7000      10.5        74       133        60
OIR    2025130    131400   -5.7300 -138.7100      10.4        75       135        60
OIR    2025130    131400   -5.7300 -138.7200      10.1        77       136        60
OIR    2025130    131400   -5.7300 -138.7300       9.9        78       138        60
OIR    2025130    131400   -5.7300 -138.7400       9.8        78       139        60
OIR    2025130    131400   -5.7300 -138.7500       9.8        78       142        60
OIR    2025130    131400   -5.7300 -138.7600       9.8        79       146        60
OIR    2025130    131400   -5.7300 -138.7900       9.7        80       145        60
OIR    2025130    131400   -5.7300 -138.8000       9.7        80       142        60
OIR    2025130    131400   -5.7300 -138.8100       9.7        80       142        60
OIR    2025130    131400   -5.7400 -138.1300      15.7        66       144        60
OIR    2025130    131400   -5.7400 -138.1400      15.5        66       145        60
OIR    2025130    131400   -5.7400 -138.1700      15.5        66       144        60
OIR    2025130    131400   -5.7400 -138.1800      15.5        66       138        60
OIR    2025130    131400   -5.7400 -138.1900      15.5        66       139        60
OIR    2025130    131400   -5.7400 -138.2000      15.5        66       138        60
OIR    2025130    131400   -5.7400 -138.2100      15.5        66       136        60
OIR    2025130    131400   -5.7400 -138.2200      15.5        66       137        60
OIR    2025130    131400   -5.7400 -138.2300      15.5        66       140        60
OIR    2025130    131400   -5.7400 -138.2400      15.5        66       141        60
OIR    2025130    131400   -5.7400 -138.2500      15.5        66       141        60
OIR    2025130    131400   -5.7400 -138.2600      15.5        66       139        60
OIR    2025130    131400   -5.7400 -138.2700      15.5        66       138        60
OIR    2025130    131400   -5.7400 -138.2800      15.5        66       139        60
OIR    2025130    131400   -5.7400 -138.2900      15.5        66       138        60
OIR    2025130    131400   -5.7400 -138.3000      15.5        66       137        60
OIR    2025130    131400   -5.7400 -138.3100      15.5        66       136        60
OIR    2025130    131400   -5.7400 -138.3200      15.5        66       136        60
OIR    2025130    131400   -5.7400 -138.3300      15.4        66       135        60
OIR    2025130    131400   -5.7400 -138.3400      15.4        66       133        60
OIR    2025130    131400   -5.7400 -138.3500      15.4        66       133        60
OIR    2025130    131400   -5.7400 -138.3600      15.4        66       133        60
OIR    2025130    131400   -5.7400 -138.3700      15.3        66       133        60
OIR    2025130    131400   -5.7400 -138.3800      15.2        66       132        60
OIR    2025130    131400   -5.7400 -138.3900      15.2        65       130        60
OIR    2025130    131400   -5.7400 -138.4000      15.0        65       129        60
OIR    2025130    131400   -5.7400 -138.4100      14.9        65       128        60
OIR    2025130    131400   -5.7400 -138.4200      14.6        65       128        60
OIR    2025130    131400   -5.7400 -138.4300      14.2        66       127        60
OIR    2025130    131400   -5.7400 -138.4400      13.9        66       127        60
OIR    2025130    131400   -5.7400 -138.4500      13.6        67       126        60
OIR    2025130    131400   -5.7400 -138.4600      13.5        68       127        60
OIR    2025130    131400   -5.7400 -138.4700      13.4        68       127        60
OIR    2025130    131400   -5.7400 -138.4800      13.4        68       127        60
OIR    2025130    131400   -5.7400 -138.4900      13.3        69       127        60
OIR    2025130    131400   -5.7400 -138.5000      13.3        69       128        60
OIR    2025130    131400   -5.7400 -138.5100      13.2        70       130        60
OIR    2025130    131400   -5.7400 -138.5200      13.1        70       132        60
OIR    2025130    131400   -5.7400 -138.5300      13.0        71       130        60
OIR    2025130    131400   -5.7400 -138.5400      12.5        71       129        60
OIR    2025130    131400   -5.7400 -138.5500      11.2        72       127        60
OIR    2025130    131400   -5.7400 -138.5600      10.4        72       125        60
OIR    2025130    131400   -5.7400 -138.5700      10.2        72       123        60
OIR    2025130    131400   -5.7400 -138.5800      10.2        72       123        60
OIR    2025130    131400   -5.7400 -138.5900      10.3        72       126        60
OIR    2025130    131400   -5.7400 -138.6000      10.3        72       128        60
OIR    2025130    131400   -5.7400 -138.6100      10.4        72       129        60
OIR    2025130    131400   -5.7400 -138.6200      10.4        72       129        60
OIR    2025130    131400   -5.7400 -138.6300      10.4        72       129        60
OIR    2025130    131400   -5.7400 -138.6400      10.5        72       129        60
OIR    2025130    131400   -5.7400 -138.6500      10.5        72       129        60
OIR    2025130    131400   -5.7400 -138.6600      10.5        72       130        60
OIR    2025130    131400   -5.7400 -138.6700      10.5        72       131        60
OIR    2025130    131400   -5.7400 -138.6800      10.6        73       131        60
OIR    2025130    131400   -5.7400 -138.6900      10.6        73       132        60
OIR    2025130    131400   -5.7400 -138.7000      10.6        73       133        60
OIR    2025130    131400   -5.7400 -138.7100      10.6        73       136        60
OIR    2025130    131400   -5.7400 -138.7200      10.5        74       139        60
OIR    2025130    131400   -5.7400 -138.7300      10.2        75       141        60
OIR    2025130    131400   -5.7400 -138.7400       9.9        76       143        60
OIR    2025130    131400   -5.7400 -138.7500       9.9        77       145        60
OIR    2025130    131400   -5.7400 -138.7600       9.8        78       147        60
OIR    2025130    131400   -5.7400 -138.8100       9.7        80       148        60
OIR    2025130    131400   -5.7500 -138.1600      15.5        66       146        60
OIR    2025130    131400   -5.7500 -138.1700      15.5        66       143        60
OIR    2025130    131400   -5.7500 -138.1800      15.5        66       140        60
OIR    2025130    131400   -5.7500 -138.1900      15.5        66       140        60
OIR    2025130    131400   -5.7500 -138.2000      15.5        66       139        60
OIR    2025130    131400   -5.7500 -138.2100      15.5        66       137        60
OIR    2025130    131400   -5.7500 -138.2200      15.5        66       137        60
OIR    2025130    131400   -5.7500 -138.2300      15.5        66       139        60
OIR    2025130    131400   -5.7500 -138.2400      15.5        66       140        60
OIR    2025130    131400   -5.7500 -138.2500      15.5        66       140        60
OIR    2025130    131400   -5.7500 -138.2600      15.5        66       141        60
OIR    2025130    131400   -5.7500 -138.2700      15.5        66       142        60
OIR    2025130    131400   -5.7500 -138.2800      15.5        66       140        60
OIR    2025130    131400   -5.7500 -138.2900      15.5        66       139        60
OIR    2025130    131400   -5.7500 -138.3000      15.5        66       137        60
OIR    2025130    131400   -5.7500 -138.3100      15.5        66       136        60
OIR    2025130    131400   -5.7500 -138.3200      15.5        66       134        60
OIR    2025130    131400   -5.7500 -138.3300      15.4        66       133        60
OIR    2025130    131400   -5.7500 -138.3400      15.4        66       132        60
OIR    2025130    131400   -5.7500 -138.3500      15.4        66       132        60
OIR    2025130    131400   -5.7500 -138.3600      15.4        66       132        60
OIR    2025130    131400   -5.7500 -138.3700      15.3        66       131        60
OIR    2025130    131400   -5.7500 -138.3800      15.3        66       130        60
OIR    2025130    131400   -5.7500 -138.3900      15.2        66       129        60
OIR    2025130    131400   -5.7500 -138.4000      15.1        66       128        60
OIR    2025130    131400   -5.7500 -138.4100      14.9        66       129        60
OIR    2025130    131400   -5.7500 -138.4200      14.7        66       129        60
OIR    2025130    131400   -5.7500 -138.4300      14.3        66       129        60
OIR    2025130    131400   -5.7500 -138.4400      14.0        67       128        60
OIR    2025130    131400   -5.7500 -138.4500      13.7        67       127        60
OIR    2025130    131400   -5.7500 -138.4600      13.6        68       127        60
OIR    2025130    131400   -5.7500 -138.4700      13.5        68       127        60
OIR    2025130    131400   -5.7500 -138.4800      13.4        68       127        60
OIR    2025130    131400   -5.7500 -138.4900      13.4        69       128        60
OIR    2025130    131400   -5.7500 -138.5000      13.4        69       129        60
OIR    2025130    131400   -5.7500 -138.5100      13.3        70       130        60
OIR    2025130    131400   -5.7500 -138.5200      13.3        70       131        60
OIR    2025130    131400   -5.7500 -138.5300      13.1        70       130        60
OIR    2025130    131400   -5.7500 -138.5400      12.8        71       128        60
OIR    2025130    131400   -5.7500 -138.5500      11.8        72       127        60
OIR    2025130    131400   -5.7500 -138.5600      10.6        72       125        60
OIR    2025130    131400   -5.7500 -138.5700      10.4        72       122        60
OIR    2025130    131400   -5.7500 -138.5800      10.4        72       122        60
OIR    2025130    131400   -5.7500 -138.5900      10.4        72       125        60
OIR    2025130    131400   -5.7500 -138.6000      10.4        72       127        60
OIR    2025130    131400   -5.7500 -138.6100      10.5        72       128        60
OIR    2025130    131400   -5.7500 -138.6200      10.5        72       129        60
OIR    2025130    131400   -5.7500 -138.6300      10.5        72       128        60
OIR    2025130    131400   -5.7500 -138.6400      10.5        72       129        60
OIR    2025130    131400   -5.7500 -138.6500      10.5        72       129        60
OIR    2025130    131400   -5.7500 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.7500 -138.6700      10.6        72       131        60
OIR    2025130    131400   -5.7500 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.7500 -138.6900      10.6        72       132        60
OIR    2025130    131400   -5.7500 -138.7000      10.6        73       133        60
OIR    2025130    131400   -5.7500 -138.7100      10.6        73       136        60
OIR    2025130    131400   -5.7500 -138.7200      10.6        73       140        60
OIR    2025130    131400   -5.7500 -138.7300      10.4        74       142        60
OIR    2025130    131400   -5.7500 -138.7400      10.1        74       143        60
OIR    2025130    131400   -5.7500 -138.7500      10.0        75       147        60
OIR    2025130    131400   -5.7600 -138.1500      15.6        66       148        60
OIR    2025130    131400   -5.7600 -138.1600      15.5        66       142        60
OIR    2025130    131400   -5.7600 -138.1700      15.5        66       142        60
OIR    2025130    131400   -5.7600 -138.1800      15.5        66       142        60
OIR    2025130    131400   -5.7600 -138.1900      15.5        66       141        60
OIR    2025130    131400   -5.7600 -138.2000      15.5        66       140        60
OIR    2025130    131400   -5.7600 -138.2100      15.5        66       138        60
OIR    2025130    131400   -5.7600 -138.2200      15.5        66       138        60
OIR    2025130    131400   -5.7600 -138.2300      15.5        66       139        60
OIR    2025130    131400   -5.7600 -138.2400      15.5        66       139        60
OIR    2025130    131400   -5.7600 -138.2500      15.5        66       138        60
OIR    2025130    131400   -5.7600 -138.2600      15.5        66       143        60
OIR    2025130    131400   -5.7600 -138.2700      15.5        66       146        60
OIR    2025130    131400   -5.7600 -138.2800      15.5        66       142        60
OIR    2025130    131400   -5.7600 -138.2900      15.5        66       139        60
OIR    2025130    131400   -5.7600 -138.3000      15.5        66       137        60
OIR    2025130    131400   -5.7600 -138.3100      15.5        66       135        60
OIR    2025130    131400   -5.7600 -138.3200      15.5        66       132        60
OIR    2025130    131400   -5.7600 -138.3300      15.4        66       131        60
OIR    2025130    131400   -5.7600 -138.3400      15.4        66       131        60
OIR    2025130    131400   -5.7600 -138.3500      15.4        66       131        60
OIR    2025130    131400   -5.7600 -138.3600      15.4        66       131        60
OIR    2025130    131400   -5.7600 -138.3700      15.3        66       129        60
OIR    2025130    131400   -5.7600 -138.3800      15.3        66       128        60
OIR    2025130    131400   -5.7600 -138.3900      15.2        66       128        60
OIR    2025130    131400   -5.7600 -138.4000      15.1        66       128        60
OIR    2025130    131400   -5.7600 -138.4100      15.0        66       129        60
OIR    2025130    131400   -5.7600 -138.4200      14.8        66       130        60
OIR    2025130    131400   -5.7600 -138.4300      14.5        66       130        60
OIR    2025130    131400   -5.7600 -138.4400      14.1        67       129        60
OIR    2025130    131400   -5.7600 -138.4500      13.8        68       127        60
OIR    2025130    131400   -5.7600 -138.4600      13.6        68       127        60
OIR    2025130    131400   -5.7600 -138.4700      13.6        68       127        60
OIR    2025130    131400   -5.7600 -138.4800      13.5        69       128        60
OIR    2025130    131400   -5.7600 -138.4900      13.5        69       128        60
OIR    2025130    131400   -5.7600 -138.5000      13.4        69       129        60
OIR    2025130    131400   -5.7600 -138.5100      13.4        69       130        60
OIR    2025130    131400   -5.7600 -138.5200      13.3        70       130        60
OIR    2025130    131400   -5.7600 -138.5300      13.3        70       129        60
OIR    2025130    131400   -5.7600 -138.5400      13.0        71       128        60
OIR    2025130    131400   -5.7600 -138.5500      12.0        72       126        60
OIR    2025130    131400   -5.7600 -138.5600      11.0        72       124        60
OIR    2025130    131400   -5.7600 -138.5700      10.5        72       122        60
OIR    2025130    131400   -5.7600 -138.5800      10.5        72       122        60
OIR    2025130    131400   -5.7600 -138.5900      10.5        72       123        60
OIR    2025130    131400   -5.7600 -138.6000      10.5        72       125        60
OIR    2025130    131400   -5.7600 -138.6100      10.5        72       127        60
OIR    2025130    131400   -5.7600 -138.6200      10.5        72       128        60
OIR    2025130    131400   -5.7600 -138.6300      10.5        72       128        60
OIR    2025130    131400   -5.7600 -138.6400      10.5        72       129        60
OIR    2025130    131400   -5.7600 -138.6500      10.6        72       130        60
OIR    2025130    131400   -5.7600 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.7600 -138.6700      10.6        72       130        60
OIR    2025130    131400   -5.7600 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.7600 -138.6900      10.6        72       132        60
OIR    2025130    131400   -5.7600 -138.7000      10.6        72       133        60
OIR    2025130    131400   -5.7600 -138.7100      10.6        72       137        60
OIR    2025130    131400   -5.7600 -138.7200      10.6        72       140        60
OIR    2025130    131400   -5.7600 -138.7300      10.5        73       142        60
OIR    2025130    131400   -5.7600 -138.7400      10.3        73       144        60
OIR    2025130    131400   -5.7700 -138.1600      15.5        66       145        60
OIR    2025130    131400   -5.7700 -138.1700      15.5        66       145        60
OIR    2025130    131400   -5.7700 -138.1800      15.5        66       145        60
OIR    2025130    131400   -5.7700 -138.1900      15.5        66       144        60
OIR    2025130    131400   -5.7700 -138.2000      15.5        66       143        60
OIR    2025130    131400   -5.7700 -138.2100      15.5        66       142        60
OIR    2025130    131400   -5.7700 -138.2200      15.5        66       142        60
OIR    2025130    131400   -5.7700 -138.2300      15.5        66       141        60
OIR    2025130    131400   -5.7700 -138.2400      15.5        66       140        60
OIR    2025130    131400   -5.7700 -138.2500      15.5        66       138        60
OIR    2025130    131400   -5.7700 -138.2600      15.5        66       143        60
OIR    2025130    131400   -5.7700 -138.2700      15.5        66       147        60
OIR    2025130    131400   -5.7700 -138.2800      15.5        66       145        60
OIR    2025130    131400   -5.7700 -138.2900      15.5        66       141        60
OIR    2025130    131400   -5.7700 -138.3000      15.5        66       136        60
OIR    2025130    131400   -5.7700 -138.3100      15.5        66       133        60
OIR    2025130    131400   -5.7700 -138.3200      15.5        66       131        60
OIR    2025130    131400   -5.7700 -138.3300      15.4        66       130        60
OIR    2025130    131400   -5.7700 -138.3400      15.4        66       131        60
OIR    2025130    131400   -5.7700 -138.3500      15.4        66       130        60
OIR    2025130    131400   -5.7700 -138.3600      15.4        66       130        60
OIR    2025130    131400   -5.7700 -138.3700      15.3        66       129        60
OIR    2025130    131400   -5.7700 -138.3800      15.3        66       128        60
OIR    2025130    131400   -5.7700 -138.3900      15.2        66       127        60
OIR    2025130    131400   -5.7700 -138.4000      15.2        66       129        60
OIR    2025130    131400   -5.7700 -138.4100      15.0        66       130        60
OIR    2025130    131400   -5.7700 -138.4200      14.9        66       132        60
OIR    2025130    131400   -5.7700 -138.4300      14.6        66       133        60
OIR    2025130    131400   -5.7700 -138.4400      14.3        67       131        60
OIR    2025130    131400   -5.7700 -138.4500      13.9        68       129        60
OIR    2025130    131400   -5.7700 -138.4600      13.7        68       129        60
OIR    2025130    131400   -5.7700 -138.4700      13.6        68       129        60
OIR    2025130    131400   -5.7700 -138.4800      13.6        69       129        60
OIR    2025130    131400   -5.7700 -138.4900      13.5        69       130        60
OIR    2025130    131400   -5.7700 -138.5000      13.5        69       131        60
OIR    2025130    131400   -5.7700 -138.5100      13.4        69       132        60
OIR    2025130    131400   -5.7700 -138.5200      13.4        70       132        60
OIR    2025130    131400   -5.7700 -138.5300      13.3        70       130        60
OIR    2025130    131400   -5.7700 -138.5400      13.2        70       129        60
OIR    2025130    131400   -5.7700 -138.5500      12.0        71       127        60
OIR    2025130    131400   -5.7700 -138.5600      11.1        72       125        60
OIR    2025130    131400   -5.7700 -138.5700      10.6        72       123        60
OIR    2025130    131400   -5.7700 -138.5800      10.5        72       122        60
OIR    2025130    131400   -5.7700 -138.5900      10.5        72       124        60
OIR    2025130    131400   -5.7700 -138.6000      10.5        72       125        60
OIR    2025130    131400   -5.7700 -138.6100      10.5        72       127        60
OIR    2025130    131400   -5.7700 -138.6200      10.5        72       128        60
OIR    2025130    131400   -5.7700 -138.6300      10.5        72       129        60
OIR    2025130    131400   -5.7700 -138.6400      10.6        72       130        60
OIR    2025130    131400   -5.7700 -138.6500      10.6        72       130        60
OIR    2025130    131400   -5.7700 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.7700 -138.6700      10.6        72       131        60
OIR    2025130    131400   -5.7700 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.7700 -138.6900      10.6        72       132        60
OIR    2025130    131400   -5.7700 -138.7000      10.6        72       133        60
OIR    2025130    131400   -5.7700 -138.7100      10.6        72       137        60
OIR    2025130    131400   -5.7700 -138.7200      10.6        72       142        60
OIR    2025130    131400   -5.7700 -138.7300      10.6        72       145        60
OIR    2025130    131400   -5.7800 -138.1600      15.6        66       148        60
OIR    2025130    131400   -5.7800 -138.1700      15.5        66       148        60
OIR    2025130    131400   -5.7800 -138.1900      15.5        66       148        60
OIR    2025130    131400   -5.7800 -138.2000      15.5        66       147        60
OIR    2025130    131400   -5.7800 -138.2100      15.5        66       147        60
OIR    2025130    131400   -5.7800 -138.2200      15.5        66       146        60
OIR    2025130    131400   -5.7800 -138.2300      15.5        66       145        60
OIR    2025130    131400   -5.7800 -138.2400      15.5        66       142        60
OIR    2025130    131400   -5.7800 -138.2500      15.5        66       139        60
OIR    2025130    131400   -5.7800 -138.2600      15.5        66       144        60
OIR    2025130    131400   -5.7800 -138.2800      15.5        66       147        60
OIR    2025130    131400   -5.7800 -138.2900      15.5        66       143        60
OIR    2025130    131400   -5.7800 -138.3000      15.5        66       136        60
OIR    2025130    131400   -5.7800 -138.3100      15.5        66       131        60
OIR    2025130    131400   -5.7800 -138.3200      15.5        66       130        60
OIR    2025130    131400   -5.7800 -138.3300      15.4        66       130        60
OIR    2025130    131400   -5.7800 -138.3400      15.4        66       130        60
OIR    2025130    131400   -5.7800 -138.3500      15.4        66       130        60
OIR    2025130    131400   -5.7800 -138.3600      15.4        66       130        60
OIR    2025130    131400   -5.7800 -138.3700      15.3        66       128        60
OIR    2025130    131400   -5.7800 -138.3800      15.3        66       128        60
OIR    2025130    131400   -5.7800 -138.3900      15.2        66       128        60
OIR    2025130    131400   -5.7800 -138.4000      15.2        66       129        60
OIR    2025130    131400   -5.7800 -138.4100      15.1        66       132        60
OIR    2025130    131400   -5.7800 -138.4200      15.0        66       133        60
OIR    2025130    131400   -5.7800 -138.4300      14.7        66       134        60
OIR    2025130    131400   -5.7800 -138.4400      14.4        67       132        60
OIR    2025130    131400   -5.7800 -138.4500      14.0        68       130        60
OIR    2025130    131400   -5.7800 -138.4600      13.7        68       130        60
OIR    2025130    131400   -5.7800 -138.4700      13.7        68       130        60
OIR    2025130    131400   -5.7800 -138.4800      13.6        69       130        60
OIR    2025130    131400   -5.7800 -138.4900      13.5        69       130        60
OIR    2025130    131400   -5.7800 -138.5000      13.5        69       132        60
OIR    2025130    131400   -5.7800 -138.5100      13.5        69       133        60
OIR    2025130    131400   -5.7800 -138.5200      13.4        70       132        60
OIR    2025130    131400   -5.7800 -138.5300      13.4        70       131        60
OIR    2025130    131400   -5.7800 -138.5400      13.3        70       129        60
OIR    2025130    131400   -5.7800 -138.5500      11.9        72       128        60
OIR    2025130    131400   -5.7800 -138.5600      11.1        72       127        60
OIR    2025130    131400   -5.7800 -138.5700      10.6        72       123        60
OIR    2025130    131400   -5.7800 -138.5800      10.6        72       123        60
OIR    2025130    131400   -5.7800 -138.5900      10.6        72       124        60
OIR    2025130    131400   -5.7800 -138.6000      10.6        72       125        60
OIR    2025130    131400   -5.7800 -138.6100      10.6        72       127        60
OIR    2025130    131400   -5.7800 -138.6200      10.6        72       128        60
OIR    2025130    131400   -5.7800 -138.6300      10.6        72       129        60
OIR    2025130    131400   -5.7800 -138.6400      10.6        72       130        60
OIR    2025130    131400   -5.7800 -138.6500      10.6        72       131        60
OIR    2025130    131400   -5.7800 -138.6600      10.6        72       131        60
OIR    2025130    131400   -5.7800 -138.6700      10.6        72       130        60
OIR    2025130    131400   -5.7800 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.7800 -138.6900      10.6        72       132        60
OIR    2025130    131400   -5.7800 -138.7000      10.7        72       133        60
OIR    2025130    131400   -5.7800 -138.7100      10.7        72       139        60
OIR    2025130    131400   -5.7800 -138.7200      10.7        72       145        60
OIR    2025130    131400   -5.7900 -138.2400      15.5        66       146        60
OIR    2025130    131400   -5.7900 -138.2500      15.5        66       140        60
OIR    2025130    131400   -5.7900 -138.2600      15.5        66       145        60
OIR    2025130    131400   -5.7900 -138.2900      15.5        66       144        60
OIR    2025130    131400   -5.7900 -138.3000      15.5        66       136        60
OIR    2025130    131400   -5.7900 -138.3100      15.5        66       132        60
OIR    2025130    131400   -5.7900 -138.3200      15.5        66       131        60
OIR    2025130    131400   -5.7900 -138.3300      15.4        66       131        60
OIR    2025130    131400   -5.7900 -138.3400      15.4        66       130        60
OIR    2025130    131400   -5.7900 -138.3500      15.4        66       130        60
OIR    2025130    131400   -5.7900 -138.3600      15.4        66       130        60
OIR    2025130    131400   -5.7900 -138.3700      15.3        66       128        60
OIR    2025130    131400   -5.7900 -138.3800      15.3        66       128        60
OIR    2025130    131400   -5.7900 -138.3900      15.2        66       130        60
OIR    2025130    131400   -5.7900 -138.4000      15.2        66       131        60
OIR    2025130    131400   -5.7900 -138.4100      15.1        66       132        60
OIR    2025130    131400   -5.7900 -138.4200      15.0        66       132        60
OIR    2025130    131400   -5.7900 -138.4300      14.9        66       133        60
OIR    2025130    131400   -5.7900 -138.4400      14.5        67       132        60
OIR    2025130    131400   -5.7900 -138.4500      14.1        67       132        60
OIR    2025130    131400   -5.7900 -138.4600      13.8        68       131        60
OIR    2025130    131400   -5.7900 -138.4700      13.7        68       130        60
OIR    2025130    131400   -5.7900 -138.4800      13.6        69       129        60
OIR    2025130    131400   -5.7900 -138.4900      13.6        69       129        60
OIR    2025130    131400   -5.7900 -138.5000      13.5        69       132        60
OIR    2025130    131400   -5.7900 -138.5100      13.5        69       132        60
OIR    2025130    131400   -5.7900 -138.5200      13.4        69       131        60
OIR    2025130    131400   -5.7900 -138.5300      13.4        70       130        60
OIR    2025130    131400   -5.7900 -138.5400      13.3        70       129        60
OIR    2025130    131400   -5.7900 -138.5500      11.5        72       128        60
OIR    2025130    131400   -5.7900 -138.5600      10.9        72       127        60
OIR    2025130    131400   -5.7900 -138.5700      10.6        72       124        60
OIR    2025130    131400   -5.7900 -138.5800      10.6        72       123        60
OIR    2025130    131400   -5.7900 -138.5900      10.6        72       124        60
OIR    2025130    131400   -5.7900 -138.6000      10.6        72       125        60
OIR    2025130    131400   -5.7900 -138.6100      10.6        72       127        60
OIR    2025130    131400   -5.7900 -138.6200      10.6        72       128        60
OIR    2025130    131400   -5.7900 -138.6300      10.6        72       128        60
OIR    2025130    131400   -5.7900 -138.6400      10.6        72       130        60
OIR    2025130    131400   -5.7900 -138.6500      10.6        72       131        60
OIR    2025130    131400   -5.7900 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.7900 -138.6700      10.6        72       130        60
OIR    2025130    131400   -5.7900 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.7900 -138.6900      10.7        72       132        60
OIR    2025130    131400   -5.7900 -138.7000      10.7        72       133        60
OIR    2025130    131400   -5.7900 -138.7100      10.7        72       142        60
OIR    2025130    131400   -5.8000 -138.2400      15.5        66       148        60
OIR    2025130    131400   -5.8000 -138.2500      15.5        66       141        60
OIR    2025130    131400   -5.8000 -138.2600      15.5        66       144        60
OIR    2025130    131400   -5.8000 -138.2700      15.5        66       147        60
OIR    2025130    131400   -5.8000 -138.2900      15.5        66       144        60
OIR    2025130    131400   -5.8000 -138.3000      15.5        66       137        60
OIR    2025130    131400   -5.8000 -138.3100      15.5        66       133        60
OIR    2025130    131400   -5.8000 -138.3200      15.5        66       132        60
OIR    2025130    131400   -5.8000 -138.3300      15.4        66       131        60
OIR    2025130    131400   -5.8000 -138.3400      15.4        66       130        60
OIR    2025130    131400   -5.8000 -138.3500      15.4        66       129        60
OIR    2025130    131400   -5.8000 -138.3600      15.4        66       129        60
OIR    2025130    131400   -5.8000 -138.3700      15.3        66       128        60
OIR    2025130    131400   -5.8000 -138.3800      15.3        66       128        60
OIR    2025130    131400   -5.8000 -138.3900      15.2        66       131        60
OIR    2025130    131400   -5.8000 -138.4000      15.2        66       132        60
OIR    2025130    131400   -5.8000 -138.4100      15.1        66       133        60
OIR    2025130    131400   -5.8000 -138.4200      15.1        66       133        60
OIR    2025130    131400   -5.8000 -138.4300      14.9        66       132        60
OIR    2025130    131400   -5.8000 -138.4400      14.7        66       132        60
OIR    2025130    131400   -5.8000 -138.4500      14.3        67       132        60
OIR    2025130    131400   -5.8000 -138.4600      14.0        68       131        60
OIR    2025130    131400   -5.8000 -138.4700      13.8        68       130        60
OIR    2025130    131400   -5.8000 -138.4800      13.7        69       129        60
OIR    2025130    131400   -5.8000 -138.4900      13.6        69       129        60
OIR    2025130    131400   -5.8000 -138.5000      13.6        69       131        60
OIR    2025130    131400   -5.8000 -138.5100      13.5        69       131        60
OIR    2025130    131400   -5.8000 -138.5200      13.4        69       130        60
OIR    2025130    131400   -5.8000 -138.5300      13.4        70       130        60
OIR    2025130    131400   -5.8000 -138.5400      13.3        70       129        60
OIR    2025130    131400   -5.8000 -138.5500      11.3        72       129        60
OIR    2025130    131400   -5.8000 -138.5600      10.7        72       128        60
OIR    2025130    131400   -5.8000 -138.5700      10.6        72       125        60
OIR    2025130    131400   -5.8000 -138.5800      10.6        72       124        60
OIR    2025130    131400   -5.8000 -138.5900      10.6        72       124        60
OIR    2025130    131400   -5.8000 -138.6000      10.6        72       125        60
OIR    2025130    131400   -5.8000 -138.6100      10.6        72       127        60
OIR    2025130    131400   -5.8000 -138.6200      10.6        72       127        60
OIR    2025130    131400   -5.8000 -138.6300      10.6        72       127        60
OIR    2025130    131400   -5.8000 -138.6400      10.6        72       129        60
OIR    2025130    131400   -5.8000 -138.6500      10.6        72       131        60
OIR    2025130    131400   -5.8000 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.8000 -138.6700      10.6        72       130        60
OIR    2025130    131400   -5.8000 -138.6800      10.6        72       131        60
OIR    2025130    131400   -5.8000 -138.6900      10.7        72       133        60
OIR    2025130    131400   -5.8000 -138.7000      10.7        72       134        60
OIR    2025130    131400   -5.8000 -138.7100      10.7        72       143        60
OIR    2025130    131400   -5.8100 -138.2400      15.5        66       148        60
OIR    2025130    131400   -5.8100 -138.2500      15.5        66       144        60
OIR    2025130    131400   -5.8100 -138.2600      15.5        66       143        60
OIR    2025130    131400   -5.8100 -138.2700      15.5        66       144        60
OIR    2025130    131400   -5.8100 -138.2800      15.5        66       145        60
OIR    2025130    131400   -5.8100 -138.2900      15.5        66       142        60
OIR    2025130    131400   -5.8100 -138.3000      15.5        66       137        60
OIR    2025130    131400   -5.8100 -138.3100      15.5        66       134        60
OIR    2025130    131400   -5.8100 -138.3200      15.5        66       133        60
OIR    2025130    131400   -5.8100 -138.3300      15.4        66       131        60
OIR    2025130    131400   -5.8100 -138.3400      15.4        66       129        60
OIR    2025130    131400   -5.8100 -138.3500      15.4        66       129        60
OIR    2025130    131400   -5.8100 -138.3600      15.4        66       129        60
OIR    2025130    131400   -5.8100 -138.3700      15.3        66       129        60
OIR    2025130    131400   -5.8100 -138.3800      15.3        66       129        60
OIR    2025130    131400   -5.8100 -138.3900      15.3        66       131        60
OIR    2025130    131400   -5.8100 -138.4000      15.2        66       133        60
OIR    2025130    131400   -5.8100 -138.4100      15.2        66       135        60
OIR    2025130    131400   -5.8100 -138.4200      15.1        66       133        60
OIR    2025130    131400   -5.8100 -138.4300      15.0        66       131        60
OIR    2025130    131400   -5.8100 -138.4400      14.9        66       131        60
OIR    2025130    131400   -5.8100 -138.4500      14.5        67       131        60
OIR    2025130    131400   -5.8100 -138.4600      14.2        67       131        60
OIR    2025130    131400   -5.8100 -138.4700      13.9        68       130        60
OIR    2025130    131400   -5.8100 -138.4800      13.8        69       130        60
OIR    2025130    131400   -5.8100 -138.4900      13.6        69       130        60
OIR    2025130    131400   -5.8100 -138.5000      13.6        69       131        60
OIR    2025130    131400   -5.8100 -138.5100      13.6        69       131        60
OIR    2025130    131400   -5.8100 -138.5200      13.5        69       130        60
OIR    2025130    131400   -5.8100 -138.5300      13.4        70       130        60
OIR    2025130    131400   -5.8100 -138.5400      13.3        70       130        60
OIR    2025130    131400   -5.8100 -138.5500      11.1        71       129        60
OIR    2025130    131400   -5.8100 -138.5600      10.6        72       128        60
OIR    2025130    131400   -5.8100 -138.5700      10.6        72       126        60
OIR    2025130    131400   -5.8100 -138.5800      10.6        72       126        60
OIR    2025130    131400   -5.8100 -138.5900      10.6        72       125        60
OIR    2025130    131400   -5.8100 -138.6000      10.6        72       126        60
OIR    2025130    131400   -5.8100 -138.6100      10.6        72       126        60
OIR    2025130    131400   -5.8100 -138.6200      10.6        72       127        60
OIR    2025130    131400   -5.8100 -138.6300      10.6        72       127        60
OIR    2025130    131400   -5.8100 -138.6400      10.6        72       129        60
OIR    2025130    131400   -5.8100 -138.6500      10.6        72       130        60
OIR    2025130    131400   -5.8100 -138.6600      10.6        72       130        60
OIR    2025130    131400   -5.8100 -138.6700      10.6        72       130        60
OIR    2025130    131400   -5.8100 -138.6800      10.6        72       133        60
OIR    2025130    131400   -5.8100 -138.6900      10.7        72       134        60
OIR    2025130    131400   -5.8100 -138.7000      10.7        72       135        60
OIR    2025130    131400   -5.8100 -138.7100      10.7        72       140        60
OIR    2025130    131400   -5.8100 -138.7200      10.8        72       146        60
OIR    2025130    131400   -5.8200 -138.2500      15.5        66       148        60
OIR    2025130    131400   -5.8200 -138.2600      15.5        66       146        60
OIR    2025130    131400   -5.8200 -138.2700      15.5        66       145        60
OIR    2025130    131400   -5.8200 -138.2800      15.5        66       145        60
OIR    2025130    131400   -5.8200 -138.2900      15.5        66       143        60
OIR    2025130    131400   -5.8200 -138.3000      15.5        66       140        60
OIR    2025130    131400   -5.8200 -138.3100      15.5        66       137        60
OIR    2025130    131400   -5.8200 -138.3200      15.4        66       135        60
OIR    2025130    131400   -5.8200 -138.3300      15.4        66       133        60
OIR    2025130    131400   -5.8200 -138.3400      15.4        66       131        60
OIR    2025130    131400   -5.8200 -138.3500      15.4        66       130        60
OIR    2025130    131400   -5.8200 -138.3600      15.4        66       130        60
OIR    2025130    131400   -5.8200 -138.3700      15.3        66       130        60
OIR    2025130    131400   -5.8200 -138.3800      15.3        66       130        60
OIR    2025130    131400   -5.8200 -138.3900      15.3        66       131        60
OIR    2025130    131400   -5.8200 -138.4000      15.3        66       133        60
OIR    2025130    131400   -5.8200 -138.4100      15.2        66       135        60
OIR    2025130    131400   -5.8200 -138.4200      15.2        66       133        60
OIR    2025130    131400   -5.8200 -138.4300      15.1        66       131        60
OIR    2025130    131400   -5.8200 -138.4400      15.0        66       131        60
OIR    2025130    131400   -5.8200 -138.4500      14.7        66       131        60
OIR    2025130    131400   -5.8200 -138.4600      14.4        67       130        60
OIR    2025130    131400   -5.8200 -138.4700      14.1        68       130        60
OIR    2025130    131400   -5.8200 -138.4800      13.9        68       130        60
OIR    2025130    131400   -5.8200 -138.4900      13.7        69       131        60
OIR    2025130    131400   -5.8200 -138.5000      13.6        69       132        60
OIR    2025130    131400   -5.8200 -138.5100      13.6        69       131        60
OIR    2025130    131400   -5.8200 -138.5200      13.5        69       130        60
OIR    2025130    131400   -5.8200 -138.5300      13.4        69       130        60
OIR    2025130    131400   -5.8200 -138.5400      13.3        70       130        60
OIR    2025130    131400   -5.8200 -138.5500      10.9        71       130        60
OIR    2025130    131400   -5.8200 -138.5600      10.6        71       129        60
OIR    2025130    131400   -5.8200 -138.5700      10.6        72       128        60
OIR    2025130    131400   -5.8200 -138.5800      10.6        72       127        60
OIR    2025130    131400   -5.8200 -138.5900      10.6        72       126        60
OIR    2025130    131400   -5.8200 -138.6000      10.6        72       126        60
OIR    2025130    131400   -5.8200 -138.6100      10.6        72       127        60
OIR    2025130    131400   -5.8200 -138.6200      10.6        72       127        60
OIR    2025130    131400   -5.8200 -138.6300      10.6        72       127        60
OIR    2025130    131400   -5.8200 -138.6400      10.6        72       129        60
OIR    2025130    131400   -5.8200 -138.6500      10.6        71       130        60
OIR    2025130    131400   -5.8200 -138.6600      10.6        71       130        60
OIR    2025130    131400   -5.8200 -138.6700      10.6        71       131        60
OIR    2025130    131400   -5.8200 -138.6800      10.6        71       133        60
OIR    2025130    131400   -5.8200 -138.6900      10.7        71       135        60
OIR    2025130    131400   -5.8200 -138.7000      10.7        71       137        60
OIR    2025130    131400   -5.8200 -138.7100      10.8        71       140        60
OIR    2025130    131400   -5.8200 -138.7200      10.9        71       143        60
OIR    2025130    131400   -5.8200 -138.7300      10.9        71       147        60
OIR    2025130    131400   -5.8300 -138.2200      15.5        66       148        60
OIR    2025130    131400   -5.8300 -138.2300      15.5        66       148        60
OIR    2025130    131400   -5.8300 -138.2900      15.5        66       147        60
OIR    2025130    131400   -5.8300 -138.3000      15.5        66       144        60
OIR    2025130    131400   -5.8300 -138.3100      15.5        66       141        60
OIR    2025130    131400   -5.8300 -138.3200      15.4        66       138        60
OIR    2025130    131400   -5.8300 -138.3300      15.4        66       136        60
OIR    2025130    131400   -5.8300 -138.3400      15.4        66       135        60
OIR    2025130    131400   -5.8300 -138.3500      15.4        66       134        60
OIR    2025130    131400   -5.8300 -138.3600      15.4        66       133        60
OIR    2025130    131400   -5.8300 -138.3700      15.3        66       131        60
OIR    2025130    131400   -5.8300 -138.3800      15.3        66       131        60
OIR    2025130    131400   -5.8300 -138.3900      15.3        66       131        60
OIR    2025130    131400   -5.8300 -138.4000      15.3        66       132        60
OIR    2025130    131400   -5.8300 -138.4100      15.2        66       132        60
OIR    2025130    131400   -5.8300 -138.4200      15.2        66       132        60
OIR    2025130    131400   -5.8300 -138.4300      15.1        66       131        60
OIR    2025130    131400   -5.8300 -138.4400      15.0        66       131        60
OIR    2025130    131400   -5.8300 -138.4500      14.9        66       130        60
OIR    2025130    131400   -5.8300 -138.4600      14.6        67       129        60
OIR    2025130    131400   -5.8300 -138.4700      14.2        68       130        60
OIR    2025130    131400   -5.8300 -138.4800      13.9        68       131        60
OIR    2025130    131400   -5.8300 -138.4900      13.8        69       132        60
OIR    2025130    131400   -5.8300 -138.5000      13.7        69       132        60
OIR    2025130    131400   -5.8300 -138.5100      13.6        69       131        60
OIR    2025130    131400   -5.8300 -138.5200      13.6        69       130        60
OIR    2025130    131400   -5.8300 -138.5300      13.5        69       130        60
OIR    2025130    131400   -5.8300 -138.5400      13.4        69       130        60
OIR    2025130    131400   -5.8300 -138.5500      10.7        71       130        60
OIR    2025130    131400   -5.8300 -138.5600      10.6        71       129        60
OIR    2025130    131400   -5.8300 -138.5700      10.6        71       129        60
OIR    2025130    131400   -5.8300 -138.5800      10.6        72       128        60
OIR    2025130    131400   -5.8300 -138.5900      10.6        72       127        60
OIR    2025130    131400   -5.8300 -138.6000      10.6        72       127        60
OIR    2025130    131400   -5.8300 -138.6100      10.6        72       128        60
OIR    2025130    131400   -5.8300 -138.6200      10.6        72       128        60
OIR    2025130    131400   -5.8300 -138.6300      10.6        71       128        60
OIR    2025130    131400   -5.8300 -138.6400      10.6        71       128        60
OIR    2025130    131400   -5.8300 -138.6500      10.6        71       129        60
OIR    2025130    131400   -5.8300 -138.6600      10.6        71       131        60
OIR    2025130    131400   -5.8300 -138.6700      10.7        71       132        60
OIR    2025130    131400   -5.8300 -138.6800      10.7        71       133        60
OIR    2025130    131400   -5.8300 -138.6900      10.7        71       136        60
OIR    2025130    131400   -5.8300 -138.7000      10.7        71       139        60
OIR    2025130    131400   -5.8300 -138.7100      10.9        70       142        60
OIR    2025130    131400   -5.8300 -138.7200      11.0        70       144        60
OIR    2025130    131400   -5.8300 -138.7300      11.1        69       146        60
OIR    2025130    131400   -5.8400 -138.2900      15.5        66       146        60
OIR    2025130    131400   -5.8400 -138.3000      15.5        66       143        60
OIR    2025130    131400   -5.8400 -138.3100      15.5        66       141        60
OIR    2025130    131400   -5.8400 -138.3200      15.4        66       139        60
OIR    2025130    131400   -5.8400 -138.3300      15.4        66       136        60
OIR    2025130    131400   -5.8400 -138.3400      15.4        66       134        60
OIR    2025130    131400   -5.8400 -138.3500      15.4        66       133        60
OIR    2025130    131400   -5.8400 -138.3600      15.4        66       132        60
OIR    2025130    131400   -5.8400 -138.3700      15.3        66       132        60
OIR    2025130    131400   -5.8400 -138.3800      15.3        66       131        60
OIR    2025130    131400   -5.8400 -138.3900      15.3        66       130        60
OIR    2025130    131400   -5.8400 -138.4000      15.3        66       130        60
OIR    2025130    131400   -5.8400 -138.4100      15.3        66       131        60
OIR    2025130    131400   -5.8400 -138.4200      15.2        66       131        60
OIR    2025130    131400   -5.8400 -138.4300      15.2        66       132        60
OIR    2025130    131400   -5.8400 -138.4400      15.1        66       131        60
OIR    2025130    131400   -5.8400 -138.4500      15.0        66       130        60
OIR    2025130    131400   -5.8400 -138.4600      14.7        67       130        60
OIR    2025130    131400   -5.8400 -138.4700      14.4        67       130        60
OIR    2025130    131400   -5.8400 -138.4800      14.0        68       131        60
OIR    2025130    131400   -5.8400 -138.4900      13.8        69       131        60
OIR    2025130    131400   -5.8400 -138.5000      13.7        69       131        60
OIR    2025130    131400   -5.8400 -138.5100      13.7        69       131        60
OIR    2025130    131400   -5.8400 -138.5200      13.6        69       131        60
OIR    2025130    131400   -5.8400 -138.5300      13.6        69       132        60
OIR    2025130    131400   -5.8400 -138.5400      13.5        69       132        60
OIR    2025130    131400   -5.8400 -138.5500      10.6        71       131        60
OIR    2025130    131400   -5.8400 -138.5600      10.6        71       130        60
OIR    2025130    131400   -5.8400 -138.5700      10.6        71       129        60
OIR    2025130    131400   -5.8400 -138.5800      10.6        71       128        60
OIR    2025130    131400   -5.8400 -138.5900      10.6        71       127        60
OIR    2025130    131400   -5.8400 -138.6000      10.6        72       127        60
OIR    2025130    131400   -5.8400 -138.6100      10.6        72       128        60
OIR    2025130    131400   -5.8400 -138.6200      10.6        71       128        60
OIR    2025130    131400   -5.8400 -138.6300      10.6        71       128        60
OIR    2025130    131400   -5.8400 -138.6400      10.6        71       129        60
OIR    2025130    131400   -5.8400 -138.6500      10.6        71       130        60
OIR    2025130    131400   -5.8400 -138.6600      10.7        70       131        60
OIR    2025130    131400   -5.8400 -138.6700      10.7        69       133        60
OIR    2025130    131400   -5.8400 -138.6800      10.8        69       135        60
OIR    2025130    131400   -5.8400 -138.6900      10.8        68       138        60
OIR    2025130    131400   -5.8400 -138.7000      10.9        67       139        60
OIR    2025130    131400   -5.8400 -138.7100      11.1        66       142        60
OIR    2025130    131400   -5.8400 -138.7200      11.4        65       144        60
OIR    2025130    131400   -5.8400 -138.7300      11.7        62       146        60
OIR    2025130    131400   -5.8500 -138.2700      15.5        66       145        60
OIR    2025130    131400   -5.8500 -138.2800      15.5        66       146        60
OIR    2025130    131400   -5.8500 -138.2900      15.5        66       145        60
OIR    2025130    131400   -5.8500 -138.3000      15.5        66       143        60
OIR    2025130    131400   -5.8500 -138.3100      15.5        66       141        60
OIR    2025130    131400   -5.8500 -138.3200      15.4        66       140        60
OIR    2025130    131400   -5.8500 -138.3300      15.4        66       136        60
OIR    2025130    131400   -5.8500 -138.3400      15.4        66       133        60
OIR    2025130    131400   -5.8500 -138.3500      15.4        66       132        60
OIR    2025130    131400   -5.8500 -138.3600      15.4        66       131        60
OIR    2025130    131400   -5.8500 -138.3700      15.3        66       132        60
OIR    2025130    131400   -5.8500 -138.3800      15.3        66       131        60
OIR    2025130    131400   -5.8500 -138.3900      15.3        66       128        60
OIR    2025130    131400   -5.8500 -138.4000      15.3        66       129        60
OIR    2025130    131400   -5.8500 -138.4100      15.3        66       130        60
OIR    2025130    131400   -5.8500 -138.4200      15.3        66       131        60
OIR    2025130    131400   -5.8500 -138.4300      15.2        66       132        60
OIR    2025130    131400   -5.8500 -138.4400      15.2        66       130        60
OIR    2025130    131400   -5.8500 -138.4500      15.1        66       129        60
OIR    2025130    131400   -5.8500 -138.4600      14.8        66       130        60
OIR    2025130    131400   -5.8500 -138.4700      14.5        67       131        60
OIR    2025130    131400   -5.8500 -138.4800      14.1        68       131        60
OIR    2025130    131400   -5.8500 -138.4900      13.8        69       130        60
OIR    2025130    131400   -5.8500 -138.5000      13.8        69       130        60
OIR    2025130    131400   -5.8500 -138.5100      13.7        69       131        60
OIR    2025130    131400   -5.8500 -138.5200      13.7        69       133        60
OIR    2025130    131400   -5.8500 -138.5300      13.6        69       134        60
OIR    2025130    131400   -5.8500 -138.5400      13.5        69       134        60
OIR    2025130    131400   -5.8500 -138.5500      10.6        71       132        60
OIR    2025130    131400   -5.8500 -138.5600      10.6        71       130        60
OIR    2025130    131400   -5.8500 -138.5700      10.5        71       129        60
OIR    2025130    131400   -5.8500 -138.5800      10.5        71       128        60
OIR    2025130    131400   -5.8500 -138.5900      10.5        71       127        60
OIR    2025130    131400   -5.8500 -138.6000      10.5        72       127        60
OIR    2025130    131400   -5.8500 -138.6100      10.5        72       127        60
OIR    2025130    131400   -5.8500 -138.6200      10.5        71       128        60
OIR    2025130    131400   -5.8500 -138.6300      10.5        71       129        60
OIR    2025130    131400   -5.8500 -138.6400      10.5        70       130        60
OIR    2025130    131400   -5.8500 -138.6500      10.6        69       131        60
OIR    2025130    131400   -5.8500 -138.6600      10.8        67       132        60
OIR    2025130    131400   -5.8500 -138.6700      10.9        66       133        60
OIR    2025130    131400   -5.8500 -138.6800      11.0        66       138        60
OIR    2025130    131400   -5.8500 -138.6900      11.1        64       140        60
OIR    2025130    131400   -5.8500 -138.7000      11.2        61       139        60
OIR    2025130    131400   -5.8500 -138.7100      11.6        58       141        60
OIR    2025130    131400   -5.8500 -138.7200      12.0        56       144        60
OIR    2025130    131400   -5.8500 -138.7300      12.3        53       146        60
OIR    2025130    131400   -5.8600 -138.2700      15.5        66       146        60
OIR    2025130    131400   -5.8600 -138.3200      15.4        66       144        60
OIR    2025130    131400   -5.8600 -138.3300      15.4        66       139        60
OIR    2025130    131400   -5.8600 -138.3400      15.4        66       134        60
OIR    2025130    131400   -5.8600 -138.3500      15.4        66       134        60
OIR    2025130    131400   -5.8600 -138.3600      15.4        66       135        60
OIR    2025130    131400   -5.8600 -138.3700      15.3        66       137        60
OIR    2025130    131400   -5.8600 -138.3800      15.3        66       137        60
OIR    2025130    131400   -5.8600 -138.3900      15.3        66       130        60
OIR    2025130    131400   -5.8600 -138.4000      15.3        66       129        60
OIR    2025130    131400   -5.8600 -138.4100      15.3        66       130        60
OIR    2025130    131400   -5.8600 -138.4200      15.3        66       132        60
OIR    2025130    131400   -5.8600 -138.4300      15.2        66       133        60
OIR    2025130    131400   -5.8600 -138.4400      15.2        66       133        60
OIR    2025130    131400   -5.8600 -138.4500      15.1        66       132        60
OIR    2025130    131400   -5.8600 -138.4600      14.9        66       132        60
OIR    2025130    131400   -5.8600 -138.4700      14.6        67       131        60
OIR    2025130    131400   -5.8600 -138.4800      14.2        68       131        60
OIR    2025130    131400   -5.8600 -138.4900      13.9        69       130        60
OIR    2025130    131400   -5.8600 -138.5000      13.8        69       130        60
OIR    2025130    131400   -5.8600 -138.5100      13.7        69       131        60
OIR    2025130    131400   -5.8600 -138.5200      13.7        69       132        60
OIR    2025130    131400   -5.8600 -138.5300      13.6        69       135        60
OIR    2025130    131400   -5.8600 -138.5400      13.6        69       137        60
OIR    2025130    131400   -5.8600 -138.5500      10.5        71       135        60
OIR    2025130    131400   -5.8600 -138.5600      10.5        71       134        60
OIR    2025130    131400   -5.8600 -138.5700      10.5        71       131        60
OIR    2025130    131400   -5.8600 -138.5800      10.5        71       130        60
OIR    2025130    131400   -5.8600 -138.5900      10.5        72       129        60
OIR    2025130    131400   -5.8600 -138.6000      10.5        72       129        60
OIR    2025130    131400   -5.8600 -138.6100      10.5        72       129        60
OIR    2025130    131400   -5.8600 -138.6200      10.5        71       131        60
OIR    2025130    131400   -5.8600 -138.6300      10.5        71       133        60
OIR    2025130    131400   -5.8600 -138.6400      10.5        69       140        60
OIR    2025130    131400   -5.8600 -138.6500      10.6        67       144        60
OIR    2025130    131400   -5.8600 -138.6600      10.8        65       143        60
OIR    2025130    131400   -5.8600 -138.6700      11.0        64       143        60
OIR    2025130    131400   -5.8600 -138.6800      11.3        61       144        60
OIR    2025130    131400   -5.8600 -138.6900      11.5        58       143        60
OIR    2025130    131400   -5.8600 -138.7000      11.5        55       141        60
OIR    2025130    131400   -5.8600 -138.7100      12.0        51       141        60
OIR    2025130    131400   -5.8600 -138.7200      12.6        47       142        60
OIR    2025130    131400   -5.8600 -138.7300      12.9        43       147        60
OIR    2025130    131400   -5.8700 -138.2300      15.5        66       147        60
OIR    2025130    131400   -5.8700 -138.3300      15.4        66       142        60
OIR    2025130    131400   -5.8700 -138.3400      15.4        66       136        60
OIR    2025130    131400   -5.8700 -138.3500      15.4        66       137        60
OIR    2025130    131400   -5.8700 -138.3600      15.4        66       138        60
OIR    2025130    131400   -5.8700 -138.3700      15.3        66       143        60
OIR    2025130    131400   -5.8700 -138.3800      15.3        66       143        60
OIR    2025130    131400   -5.8700 -138.3900      15.3        66       132        60
OIR    2025130    131400   -5.8700 -138.4000      15.3        66       129        60
OIR    2025130    131400   -5.8700 -138.4100      15.3        66       131        60
OIR    2025130    131400   -5.8700 -138.4200      15.3        66       133        60
OIR    2025130    131400   -5.8700 -138.4300      15.3        66       135        60
OIR    2025130    131400   -5.8700 -138.4400      15.2        66       135        60
OIR    2025130    131400   -5.8700 -138.4500      15.1        66       135        60
OIR    2025130    131400   -5.8700 -138.4600      14.9        66       134        60
OIR    2025130    131400   -5.8700 -138.4700      14.6        67       132        60
OIR    2025130    131400   -5.8700 -138.4800      14.3        68       131        60
OIR    2025130    131400   -5.8700 -138.4900      14.0        69       131        60
OIR    2025130    131400   -5.8700 -138.5000      13.8        69       131        60
OIR    2025130    131400   -5.8700 -138.5100      13.7        69       131        60
OIR    2025130    131400   -5.8700 -138.5200      13.7        69       132        60
OIR    2025130    131400   -5.8700 -138.5300      13.6        69       137        60
OIR    2025130    131400   -5.8700 -138.5400      13.6        69       140        60
OIR    2025130    131400   -5.8700 -138.5500      10.5        71       138        60
OIR    2025130    131400   -5.8700 -138.5600      10.5        71       137        60
OIR    2025130    131400   -5.8700 -138.5700      10.5        71       133        60
OIR    2025130    131400   -5.8700 -138.5800      10.5        71       131        60
OIR    2025130    131400   -5.8700 -138.5900      10.5        72       131        60
OIR    2025130    131400   -5.8700 -138.6000      10.5        72       131        60
OIR    2025130    131400   -5.8700 -138.6100      10.5        72       131        60
OIR    2025130    131400   -5.8700 -138.6200      10.5        72       134        60
OIR    2025130    131400   -5.8700 -138.6300      10.4        71       139        60
OIR    2025130    131400   -5.8700 -138.7000      11.9        51       144        60
OIR    2025130    131400   -5.8700 -138.7100      12.5        46       141        60
OIR    2025130    131400   -5.8700 -138.7200      12.9        43       141        60
OIR    2025130    131400   -5.8800 -138.2300      15.5        66       148        60
OIR    2025130    131400   -5.8800 -138.3400      15.4        66       143        60
OIR    2025130    131400   -5.8800 -138.3500      15.4        66       143        60
OIR    2025130    131400   -5.8800 -138.3600      15.4        66       143        60
OIR    2025130    131400   -5.8800 -138.3900      15.3        66       139        60
OIR    2025130    131400   -5.8800 -138.4000      15.3        66       138        60
OIR    2025130    131400   -5.8800 -138.4100      15.3        66       141        60
OIR    2025130    131400   -5.8800 -138.4200      15.3        66       140        60
OIR    2025130    131400   -5.8800 -138.4300      15.3        66       140        60
OIR    2025130    131400   -5.8800 -138.4400      15.2        65       143        60
OIR    2025130    131400   -5.8800 -138.4500      15.1        66       145        60
OIR    2025130    131400   -5.8800 -138.4600      15.0        66       140        60
OIR    2025130    131400   -5.8800 -138.4700      14.7        67       136        60
OIR    2025130    131400   -5.8800 -138.4800      14.5        67       132        60
OIR    2025130    131400   -5.8800 -138.4900      14.2        68       130        60
OIR    2025130    131400   -5.8800 -138.5000      14.0        68       131        60
OIR    2025130    131400   -5.8800 -138.5100      13.8        68       134        60
OIR    2025130    131400   -5.8800 -138.5200      13.7        69       137        60
OIR    2025130    131400   -5.8800 -138.5300      13.6        69       141        60
OIR    2025130    131400   -5.8800 -138.5400      13.4        69       143        60
OIR    2025130    131400   -5.8800 -138.5500      10.5        70       142        60
OIR    2025130    131400   -5.8800 -138.5600      10.4        70       140        60
OIR    2025130    131400   -5.8800 -138.5700      10.4        71       134        60
OIR    2025130    131400   -5.8800 -138.5800      10.5        71       132        60
OIR    2025130    131400   -5.8800 -138.5900      10.5        71       133        60
OIR    2025130    131400   -5.8800 -138.6000      10.5        72       133        60
OIR    2025130    131400   -5.8800 -138.6100      10.5        72       133        60
OIR    2025130    131400   -5.8800 -138.6200      10.4        72       139        60
OIR    2025130    131400   -5.8800 -138.7100      13.3        41       145        60
OIR    2025130    131400   -5.8800 -138.7200      13.6        39       144        60
OIR    2025130    131400   -5.8900 -138.3500      15.4        66       147        60
OIR    2025130    131400   -5.8900 -138.3600      15.4        66       146        60
OIR    2025130    131400   -5.8900 -138.3900      15.3        66       144        60
OIR    2025130    131400   -5.8900 -138.4000      15.3        66       144        60
OIR    2025130    131400   -5.8900 -138.4100      15.3        66       147        60
OIR    2025130    131400   -5.8900 -138.4200      15.3        65       144        60
OIR    2025130    131400   -5.8900 -138.4300      15.3        65       142        60
OIR    2025130    131400   -5.8900 -138.4400      15.3        65       146        60
OIR    2025130    131400   -5.8900 -138.4600      15.0        66       143        60
OIR    2025130    131400   -5.8900 -138.4700      14.8        66       138        60
OIR    2025130    131400   -5.8900 -138.4800      14.6        67       134        60
OIR    2025130    131400   -5.8900 -138.4900      14.3        67       132        60
OIR    2025130    131400   -5.8900 -138.5000      14.1        68       134        60
OIR    2025130    131400   -5.8900 -138.5100      13.9        68       138        60
OIR    2025130    131400   -5.8900 -138.5200      13.8        68       143        60
OIR    2025130    131400   -5.8900 -138.5300      13.6        69       145        60
OIR    2025130    131400   -5.8900 -138.5400      13.0        69       146        60
OIR    2025130    131400   -5.8900 -138.5500      10.4        68       146        60
OIR    2025130    131400   -5.8900 -138.5600      10.4        69       144        60
OIR    2025130    131400   -5.8900 -138.5700      10.3        69       137        60
OIR    2025130    131400   -5.8900 -138.5800      10.5        70       134        60
OIR    2025130    131400   -5.8900 -138.5900      10.6        71       136        60
OIR    2025130    131400   -5.8900 -138.6000      10.6        71       136        60
OIR    2025130    131400   -5.8900 -138.6100      10.5        72       135        60
OIR    2025130    131400   -5.8900 -138.6200      10.2        71       142        60
OIR    2025130    131400   -5.8900 -138.7200      13.5        37       146        60
OIR    2025130    131400   -5.9000 -138.2500      15.5        66       148        60
OIR    2025130    131400   -5.9000 -138.3600      15.4        66       147        60
OIR    2025130    131400   -5.9000 -138.3900      15.4        66       147        60
OIR    2025130    131400   -5.9000 -138.4000      15.4        65       147        60
OIR    2025130    131400   -5.9000 -138.4100      15.4        65       147        60
OIR    2025130    131400   -5.9000 -138.4200      15.3        65       143        60
OIR    2025130    131400   -5.9000 -138.4300      15.3        65       140        60
OIR    2025130    131400   -5.9000 -138.4400      15.3        65       144        60
OIR    2025130    131400   -5.9000 -138.4600      15.2        65       141        60
OIR    2025130    131400   -5.9000 -138.4700      15.1        64       137        60
OIR    2025130    131400   -5.9000 -138.4800      15.1        64       137        60
OIR    2025130    131400   -5.9000 -138.4900      15.1        63       137        60
OIR    2025130    131400   -5.9000 -138.5000      15.0        63       139        60
OIR    2025130    131400   -5.9000 -138.5100      14.9        62       144        60
OIR    2025130    131400   -5.9000 -138.5700      10.3        65       144        60
OIR    2025130    131400   -5.9000 -138.5800      10.8        64       140        60
OIR    2025130    131400   -5.9000 -138.5900      11.1        64       139        60
OIR    2025130    131400   -5.9000 -138.6000      10.9        68       137        60
OIR    2025130    131400   -5.9000 -138.6100      10.4        71       136        60
OIR    2025130    131400   -5.9000 -138.6200       9.9        70       142        60
OIR    2025130    131400   -5.9000 -138.7200      13.4        35       147        60
OIR    2025130    131400   -5.9100 -138.3600      15.4        66       147        60
OIR    2025130    131400   -5.9100 -138.4200      15.4        65       144        60
OIR    2025130    131400   -5.9100 -138.4300      15.3        65       140        60
OIR    2025130    131400   -5.9100 -138.4400      15.3        65       144        60
OIR    2025130    131400   -5.9100 -138.4500      15.3        65       147        60
OIR    2025130    131400   -5.9100 -138.4600      15.3        64       140        60
OIR    2025130    131400   -5.9100 -138.4700      15.2        64       137        60
OIR    2025130    131400   -5.9100 -138.4800      15.3        63       138        60
OIR    2025130    131400   -5.9100 -138.4900      15.2        62       139        60
OIR    2025130    131400   -5.9100 -138.5000      15.2        62       141        60
OIR    2025130    131400   -5.9100 -138.5100      15.0        61       145        60
OIR    2025130    131400   -5.9100 -138.5900      11.7        54       145        60
OIR    2025130    131400   -5.9100 -138.6000      11.1        56       143        60
OIR    2025130    131400   -5.9100 -138.6100      10.3        59       140        60
OIR    2025130    131400   -5.9100 -138.6200       9.6        62       145        60
OIR    2025130    131400   -5.9200 -138.3900      15.4        65       147        60
OIR    2025130    131400   -5.9200 -138.4300      15.3        65       144        60
OIR    2025130    131400   -5.9200 -138.4400      15.3        65       147        60
OIR    2025130    131400   -5.9200 -138.4600      15.5        63       141        60
OIR    2025130    131400   -5.9200 -138.4700      15.6        62       138        60
OIR    2025130    131400   -5.9200 -138.4800      15.6        61       138        60
OIR    2025130    131400   -5.9200 -138.4900      15.5        60       138        60
OIR    2025130    131400   -5.9200 -138.5000      15.4        59       137        60
OIR    2025130    131400   -5.9200 -138.5100      15.2        59       141        60
OIR    2025130    131400   -5.9300 -138.3900      15.4        65       145        60
OIR    2025130    131400   -5.9300 -138.4000      15.4        65       146        60
OIR    2025130    131400   -5.9300 -138.4300      15.4        65       147        60
OIR    2025130    131400   -5.9300 -138.4600      15.6        62       146        60
OIR    2025130    131400   -5.9300 -138.4700      15.8        60       142        60
OIR    2025130    131400   -5.9300 -138.4800      15.9        60       141        60
OIR    2025130    131400   -5.9300 -138.4900      15.7        58       140        60
OIR    2025130    131400   -5.9300 -138.5000      15.5        58       140        60
OIR    2025130    131400   -5.9300 -138.5100      15.3        57       143        60
OIR    2025130    131400   -5.9400 -138.3800      15.4        66       144        60
OIR    2025130    131400   -5.9400 -138.3900      15.4        65       143        60
OIR    2025130    131400   -5.9400 -138.4000      15.4        65       145        60
OIR    2025130    131400   -5.9400 -138.4800      15.9        59       145        60
OIR    2025130    131400   -5.9400 -138.4900      15.8        58       143        60
OIR    2025130    131400   -5.9400 -138.5000      15.5        57       144        60
OIR    2025130    131400   -5.9400 -138.5100      15.3        57       147        60
OIR    2025130    131400   -6.3700 -141.0900       7.6        67       148        60
OIR    2025130    131400   -6.3700 -141.1000       7.6        68       146        60
OIR    2025130    131400   -6.3700 -141.1100       7.6        68       147        60
OIR    2025130    131400   -6.3800 -141.0800       7.5        66       148        60
OIR    2025130    131400   -6.3800 -141.0900       7.6        67       147        60
OIR    2025130    131400   -6.3800 -141.1000       7.6        67       144        60
OIR    2025130    131400   -6.3800 -141.1100       7.6        68       143        60
OIR    2025130    131400   -6.3800 -141.1600       7.7        69       147        60
OIR    2025130    131400   -6.3900 -141.0700       7.5        65       148        60
OIR    2025130    131400   -6.3900 -141.0800       7.5        66       145        60
OIR    2025130    131400   -6.3900 -141.0900       7.6        66       143        60
OIR    2025130    131400   -6.3900 -141.1000       7.6        67       141        60
OIR    2025130    131400   -6.3900 -141.1100       7.6        67       141        60
OIR    2025130    131400   -6.3900 -141.1600       7.7        69       147        60
OIR    2025130    131400   -6.4000 -141.0700       7.5        65       146        60
OIR    2025130    131400   -6.4000 -141.0800       7.5        66       143        60
OIR    2025130    131400   -6.4000 -141.0900       7.6        66       140        60
OIR    2025130    131400   -6.4000 -141.1000       7.6        67       139        60
OIR    2025130    131400   -6.4000 -141.1100       7.6        67       140        60
OIR    2025130    131400   -6.4000 -141.1200       7.7        68       147        60
OIR    2025130    131400   -6.4000 -141.1600       7.7        69       148        60
OIR    2025130    131400   -6.4100 -141.0700       7.5        65       144        60
OIR    2025130    131400   -6.4100 -141.0800       7.5        65       142        60
OIR    2025130    131400   -6.4100 -141.0900       7.6        66       140        60
OIR    2025130    131400   -6.4100 -141.1000       7.6        67       138        60
OIR    2025130    131400   -6.4100 -141.1100       7.7        67       138        60
OIR    2025130    131400   -6.4100 -141.1200       7.7        68       146        60
OIR    2025130    131400   -6.4200 -141.0700       7.5        65       144        60
OIR    2025130    131400   -6.4200 -141.0800       7.5        66       142        60
OIR    2025130    131400   -6.4200 -141.0900       7.6        66       139        60
OIR    2025130    131400   -6.4200 -141.1000       7.6        67       138        60
OIR    2025130    131400   -6.4200 -141.1100       7.7        67       139        60
OIR    2025130    131400   -6.4200 -141.1200       7.7        68       146        60
OIR    2025130    131400   -6.4300 -141.0700       7.5        65       148        60
OIR    2025130    131400   -6.4300 -141.0800       7.5        66       143        60
OIR    2025130    131400   -6.4300 -141.0900       7.6        66       139        60
OIR    2025130    131400   -6.4300 -141.1000       7.6        67       139        60
OIR    2025130    131400   -6.4300 -141.1100       7.7        67       142        60
OIR    2025130    131400   -6.4300 -141.1200       7.7        68       148        60
OIR    2025130    131400   -6.4400 -141.0800       7.6        66       146        60
OIR    2025130    131400   -6.4400 -141.0900       7.6        66       142        60
OIR    2025130    131400   -6.4400 -141.1000       7.7        67       142        60
OIR    2025130    131400   -6.4400 -141.1100       7.7        67       144        60
OIR    2025130    131400   -6.4500 -141.0900       7.6        66       147        60
OIR    2025130    131400   -6.4500 -141.1000       7.7        67       146        60
OIR    2025130    131400   -6.4500 -141.1100       7.7        67       146        60
OIR    2025130    131400   -6.4600 -141.1100       7.7        67       148        60
OIR    2025130    131400   -6.4600 -141.1200       7.8        67       148        60
OIR    2025130    131400   -6.4600 -141.1300       7.8        68       148        60
OIR    2025130    131400   -6.4700 -141.1200       7.8        67       147        60
OIR    2025130    131400   -6.4700 -141.1300       7.8        68       147        60
OIR    2025130    131400   -6.4700 -141.1400       7.8        68       148        60
OIR    2025130    131400   -6.4700 -141.4900      10.8       129       148        60
OIR    2025130    131400   -6.4700 -141.5000       7.7       149       151        60
OIR    2025130    131400   -6.4800 -141.0600       7.7        53       146        60
OIR    2025130    131400   -6.4800 -141.0700       7.6        56       144        60
OIR    2025130    131400   -6.4800 -141.0800       7.6        60       146        60
OIR    2025130    131400   -6.4800 -141.1100       7.7        67       147        60
OIR    2025130    131400   -6.4800 -141.1200       7.8        67       144        60
OIR    2025130    131400   -6.4800 -141.1300       7.8        68       144        60
OIR    2025130    131400   -6.4800 -141.1400       7.8        68       145        60
OIR    2025130    131400   -6.4800 -141.1500       7.8        68       147        60
OIR    2025130    131400   -6.4800 -141.3800      12.3        99       150        60
OIR    2025130    131400   -6.4800 -141.4800      13.5       115       144        60
OIR    2025130    131400   -6.4800 -141.4900      11.3       126       140        60
OIR    2025130    131400   -6.4800 -141.5000       7.8       146       143        60
OIR    2025130    131400   -6.4900 -141.0400       7.9        48       148        60
OIR    2025130    131400   -6.4900 -141.0500       7.9        49       144        60
OIR    2025130    131400   -6.4900 -141.0600       7.9        51       142        60
OIR    2025130    131400   -6.4900 -141.0700       7.8        52       141        60
OIR    2025130    131400   -6.4900 -141.0800       7.8        56       143        60
OIR    2025130    131400   -6.4900 -141.0900       7.6        60       145        60
OIR    2025130    131400   -6.4900 -141.1000       7.7        64       146        60
OIR    2025130    131400   -6.4900 -141.1100       7.8        66       145        60
OIR    2025130    131400   -6.4900 -141.1200       7.8        67       143        60
OIR    2025130    131400   -6.4900 -141.1300       7.8        68       143        60
OIR    2025130    131400   -6.4900 -141.1400       7.8        68       144        60
OIR    2025130    131400   -6.4900 -141.1500       7.8        68       146        60
OIR    2025130    131400   -6.4900 -141.3700      12.1        92       148        60
OIR    2025130    131400   -6.4900 -141.3800      11.7        91       146        60
OIR    2025130    131400   -6.4900 -141.4300      12.6       102       147        60
OIR    2025130    131400   -6.4900 -141.4400      13.4       103       149        60
OIR    2025130    131400   -6.4900 -141.4500      14.0       104       151        60
OIR    2025130    131400   -6.4900 -141.4600      14.3       106       150        60
OIR    2025130    131400   -6.4900 -141.4700      14.3       107       146        60
OIR    2025130    131400   -6.4900 -141.4800      13.6       110       138        60
OIR    2025130    131400   -6.4900 -141.4900      10.7       123       134        60
OIR    2025130    131400   -6.4900 -141.5000       7.3       143       138        60
OIR    2025130    131400   -6.5000 -141.0600       8.1        49       147        60
OIR    2025130    131400   -6.5000 -141.0700       8.0        49       146        60
OIR    2025130    131400   -6.5000 -141.4700      14.4       107       148        60
OIR    2025130    131400   -6.5000 -141.4800      14.2       109       139        60
OIR    2025130    131400   -6.5000 -141.4900      11.4       119       135        60
OIR    2025130    131400   -6.5000 -141.5000       7.2       136       139        60
OIR    2025130    131400   -6.5100 -141.4700      14.9       106       147        60
OIR    2025130    131400   -6.5100 -141.4800      15.0       107       139        60
OIR    2025130    131400   -6.5100 -141.4900      12.4       113       136        60
OIR    2025130    131400   -6.5100 -141.5000       6.5       125       140        60
OIR    2025130    131400   -6.5200 -141.4700      15.8       102       143        60
OIR    2025130    131400   -6.5200 -141.4800      15.8       103       138        60
OIR    2025130    131400   -6.5200 -141.4900      13.6       107       136        60
OIR    2025130    131400   -6.5200 -141.5000       6.0       112       141        60
OIR    2025130    131400   -6.5300 -141.0900       8.2        47       145        60
OIR    2025130    131400   -6.5300 -141.1000       8.2        48       146        60
OIR    2025130    131400   -6.5300 -141.1100       8.1        51       147        60
OIR    2025130    131400   -6.5300 -141.4700      16.7        95       141        60
OIR    2025130    131400   -6.5300 -141.4800      16.6        97       136        60
OIR    2025130    131400   -6.5300 -141.4900      14.7        99       135        60
OIR    2025130    131400   -6.5300 -141.5000       6.7        98       141        60
OIR    2025130    131400   -6.5400 -141.0400       8.3        45       148        60
OIR    2025130    131400   -6.5400 -141.0500       8.3        45       147        60
OIR    2025130    131400   -6.5400 -141.0600       8.3        45       148        60
OIR    2025130    131400   -6.5400 -141.0800       8.3        46       145        60
OIR    2025130    131400   -6.5400 -141.0900       8.3        46       141        60
OIR    2025130    131400   -6.5400 -141.1000       8.3        47       141        60
OIR    2025130    131400   -6.5400 -141.1100       8.2        48       142        60
OIR    2025130    131400   -6.5400 -141.1200       8.1        53       147        60
OIR    2025130    131400   -6.5400 -141.4700      17.2        92       140        60
OIR    2025130    131400   -6.5400 -141.4800      16.8        93       135        60
OIR    2025130    131400   -6.5400 -141.4900      15.7        94       134        60
OIR    2025130    131400   -6.5400 -141.5000       6.1        87       140        60
OIR    2025130    131400   -6.5500 -141.0600       8.3        45       148        60
OIR    2025130    131400   -6.5500 -141.0700       8.3        45       147        60
OIR    2025130    131400   -6.5500 -141.0800       8.3        46       145        60
OIR    2025130    131400   -6.5500 -141.0900       8.3        46       143        60
OIR    2025130    131400   -6.5500 -141.1000       8.3        46       143        60
OIR    2025130    131400   -6.5500 -141.1100       8.2        47       144        60
OIR    2025130    131400   -6.5500 -141.4700      17.1        90       139        60
OIR    2025130    131400   -6.5500 -141.4800      16.7        91       135        60
OIR    2025130    131400   -6.5500 -141.4900      14.9        89       134        60
OIR    2025130    131400   -6.5600 -141.0700       8.3        45       146        60
OIR    2025130    131400   -6.5600 -141.0800       8.3        46       147        60
OIR    2025130    131400   -6.5600 -141.0900       8.3        46       147        60
OIR    2025130    131400   -6.5600 -141.1000       8.3        46       148        60
OIR    2025130    131400   -6.5600 -141.4700      16.4        88       139        60
OIR    2025130    131400   -6.5600 -141.4800      15.8        87       136        60
OIR    2025130    131400   -6.5600 -141.4900      10.7        78       136        60
OIR    2025130    131400   -6.5700 -141.0600       8.3        45       147        60
OIR    2025130    131400   -6.5700 -141.0700       8.3        45       143        60
OIR    2025130    131400   -6.5700 -141.0800       8.3        45       144        60
OIR    2025130    131400   -6.5700 -141.0900       8.3        46       144        60
OIR    2025130    131400   -6.5700 -141.1000       8.3        46       145        60
OIR    2025130    131400   -6.5700 -141.1100       8.3        46       146        60
OIR    2025130    131400   -6.5700 -141.4700      15.3        85       137        60
OIR    2025130    131400   -6.5700 -141.4800      13.8        82       131        60
OIR    2025130    131400   -6.5700 -141.4900       5.6        55       130        60
OIR    2025130    131400   -6.5700 -141.5000       4.0       343       137        60
OIR    2025130    131400   -6.5800 -141.0600       8.4        45       144        60
OIR    2025130    131400   -6.5800 -141.0700       8.4        45       141        60
OIR    2025130    131400   -6.5800 -141.0800       8.3        45       141        60
OIR    2025130    131400   -6.5800 -141.0900       8.3        45       141        60
OIR    2025130    131400   -6.5800 -141.1000       8.3        45       142        60
OIR    2025130    131400   -6.5800 -141.1100       8.3        45       143        60
OIR    2025130    131400   -6.5800 -141.4600      13.0        75       148        60
OIR    2025130    131400   -6.5800 -141.4700      12.4        71       134        60
OIR    2025130    131400   -6.5800 -141.4800      11.5        69       126        60
OIR    2025130    131400   -6.5800 -141.4900       6.4        50       124        60
OIR    2025130    131400   -6.5800 -141.5000       4.2       347       132        60
OIR    2025130    131400   -6.5900 -141.0600       8.4        45       148        60
OIR    2025130    131400   -6.5900 -141.0700       8.4        45       145        60
OIR    2025130    131400   -6.5900 -141.0800       8.3        45       144        60
OIR    2025130    131400   -6.5900 -141.0900       8.3        45       143        60
OIR    2025130    131400   -6.5900 -141.1000       8.3        45       143        60
OIR    2025130    131400   -6.5900 -141.1100       8.3        45       145        60
OIR    2025130    131400   -6.5900 -141.4700      11.5        65       135        60
OIR    2025130    131400   -6.5900 -141.4800      11.1        65       128        60
OIR    2025130    131400   -6.5900 -141.4900       8.1        56       126        60
OIR    2025130    131400   -6.5900 -141.5000       4.3       347       134        60
OIR    2025130    131400   -6.6000 -141.0800       8.3        45       147        60
OIR    2025130    131400   -6.6000 -141.0900       8.3        45       145        60
OIR    2025130    131400   -6.6000 -141.1000       8.3        45       145        60
OIR    2025130    131400   -6.6000 -141.1100       8.3        45       147        60
OIR    2025130    131400   -6.6000 -141.4700      11.2        63       136        60
OIR    2025130    131400   -6.6000 -141.4800      11.0        62       130        60
OIR    2025130    131400   -6.6000 -141.4900       9.0        57       129        60
OIR    2025130    131400   -6.6000 -141.5000       4.4       347       135        60
OIR    2025130    131400   -6.6100 -141.4700      11.1        61       139        60
OIR    2025130    131400   -6.6100 -141.4800      10.7        60       134        60
OIR    2025130    131400   -6.6100 -141.4900       8.0        50       132        60
OIR    2025130    131400   -6.6100 -141.5000       4.4       351       138        60
OIR    2025130    131400   -6.6200 -141.4700      11.4        58       145        60
OIR    2025130    131400   -6.6200 -141.4800      10.7        56       137        60
OIR    2025130    131400   -6.6200 -141.4900       7.2        44       133        60
OIR    2025130    131400   -6.6200 -141.5000       4.4       356       139        60
OIR    2025130    131400   -6.6300 -141.4800      10.2        55       137        60
OIR    2025130    131400   -6.6300 -141.4900       7.0        47       128        60
OIR    2025130    131400   -6.6300 -141.5000       4.6        20       136        60
OIR    2025130    131400   -6.6400 -141.4800       9.5        55       142        60
OIR    2025130    131400   -6.6400 -141.4900       7.4        52       132        60
OIR    2025130    131400   -6.6400 -141.5000       5.7        43       137        60
OIR    2025130    131400   -6.6500 -141.4900       8.2        56       140        60
OIR    2025130    131400   -6.6500 -141.5000       7.5        57       138        60
OIR    2025130    131400   -6.6600 -141.5000       8.0        53       146        60
OIR    2025130    131400   -7.0900 -141.1400      25.1       216       145        60
OIR    2025130    131400   -7.0900 -141.1500      27.3       232       143        60
OIR    2025130    131400   -7.1000 -141.1300      23.4       190       142        60
OIR    2025130    131400   -7.1000 -141.1400      26.1       205       136        60
OIR    2025130    131400   -7.1000 -141.1500      23.7       227       133        60
OIR    2025130    131400   -7.1000 -141.1600      21.9       255       135        60
OIR    2025130    131400   -7.1100 -141.1000      14.4        98       143        60
OIR    2025130    131400   -7.1100 -141.1100       5.9        94       138        60
OIR    2025130    131400   -7.1100 -141.1200       7.3       147       137        60
OIR    2025130    131400   -7.1100 -141.1300      10.3       180       134        60
OIR    2025130    131400   -7.1100 -141.1400      12.4       203       130        60
OIR    2025130    131400   -7.1100 -141.1500      13.4       230       128        60
OIR    2025130    131400   -7.1100 -141.1600      15.4       252       128        60
OIR    2025130    131400   -7.1100 -141.1700      15.8       266       129        60
OIR    2025130    131400   -7.1100 -141.1800      19.2       268       130        60
OIR    2025130    131400   -7.1100 -141.1900      22.1       265       130        60
OIR    2025130    131400   -7.1100 -141.2000      22.2       274       129        60
OIR    2025130    131400   -7.1200 -141.1000      18.1        71       142        60
OIR    2025130    131400   -7.1200 -141.1100      16.0        69       134        60
OIR    2025130    131400   -7.1200 -141.1200      12.8        60       132        60
OIR    2025130    131400   -7.1200 -141.1300       9.6        59       129        60
OIR    2025130    131400   -7.1200 -141.1400       5.8        54       125        60
OIR    2025130    131400   -7.1200 -141.1500       5.0         1       123        60
OIR    2025130    131400   -7.1200 -141.1600       9.5       336       122        60
OIR    2025130    131400   -7.1200 -141.1700      13.5       330       123        60
OIR    2025130    131400   -7.1200 -141.1800      17.4       325       126        60
OIR    2025130    131400   -7.1200 -141.1900      19.0       326       127        60
OIR    2025130    131400   -7.1200 -141.2000      19.5       339       129        60
OIR    2025130    131400   -7.1300 -141.1000      19.8        69       143        60
OIR    2025130    131400   -7.1300 -141.1100      18.1        65       132        60
OIR    2025130    131400   -7.1300 -141.1200      16.1        58       128        60
OIR    2025130    131400   -7.1300 -141.1300      14.4        55       124        60
OIR    2025130    131400   -7.1300 -141.1400      12.4        42       122        60
OIR    2025130    131400   -7.1300 -141.1500      13.1        22       119        60
OIR    2025130    131400   -7.1300 -141.1600      16.5         7       116        60
OIR    2025130    131400   -7.1300 -141.1700      21.1         3       119        60
OIR    2025130    131400   -7.1300 -141.1800      22.9       357       124        60
OIR    2025130    131400   -7.1300 -141.1900      22.9       351       128        60
OIR    2025130    131400   -7.1300 -141.2000      23.2       353       132        60
OIR    2025130    131400   -7.1400 -141.1000      22.4        63       141        60
OIR    2025130    131400   -7.1400 -141.1100      20.1        63       127        60
OIR    2025130    131400   -7.1400 -141.1200      18.1        58       125        60
OIR    2025130    131400   -7.1400 -141.1300      17.7        51       123        60
OIR    2025130    131400   -7.1400 -141.1400      18.2        40       121        60
OIR    2025130    131400   -7.1400 -141.1500      18.0        32       119        60
OIR    2025130    131400   -7.1400 -141.1600      17.8        21       115        60
OIR    2025130    131400   -7.1400 -141.1700      20.1         8       116        60
OIR    2025130    131400   -7.1400 -141.1800      22.4         2       121        60
OIR    2025130    131400   -7.1400 -141.1900      23.1       354       128        60
OIR    2025130    131400   -7.1400 -141.2000      23.5       353       135        60
OIR    2025130    131400   -7.1500 -135.8400       4.5       151       142        60
OIR    2025130    131400   -7.1500 -141.1000      24.9        64       139        60
OIR    2025130    131400   -7.1500 -141.1100      23.5        64       123        60
OIR    2025130    131400   -7.1500 -141.1200      18.6        56       122        60
OIR    2025130    131400   -7.1500 -141.1300      19.5        41       122        60
OIR    2025130    131400   -7.1500 -141.1400      21.1        34       123        60
OIR    2025130    131400   -7.1500 -141.1500      21.3        35       122        60
OIR    2025130    131400   -7.1500 -141.1600      21.4        33       119        60
OIR    2025130    131400   -7.1500 -141.1700      22.8        23       119        60
OIR    2025130    131400   -7.1500 -141.1800      23.0        13       122        60
OIR    2025130    131400   -7.1500 -141.1900      23.5         1       131        60
OIR    2025130    131400   -7.1500 -141.2000      24.2       353       141        60
OIR    2025130    131400   -7.1600 -135.8400       4.5       151       128        60
OIR    2025130    131400   -7.1600 -141.1000      26.5        65       140        60
OIR    2025130    131400   -7.1600 -141.1100      24.9        56       123        60
OIR    2025130    131400   -7.1600 -141.1200      22.0        41       121        60
OIR    2025130    131400   -7.1600 -141.1300      20.6        33       124        60
OIR    2025130    131400   -7.1600 -141.1400      21.0        35       130        60
OIR    2025130    131400   -7.1600 -141.1500      21.2        36       133        60
OIR    2025130    131400   -7.1600 -141.1600      21.9        36       132        60
OIR    2025130    131400   -7.1600 -141.1700      22.6        33       129        60
OIR    2025130    131400   -7.1600 -141.1800      22.3        33       128        60
OIR    2025130    131400   -7.1600 -141.1900      23.5        27       139        60
OIR    2025130    131400   -7.1700 -135.8400       4.5       151       128        60
OIR    2025130    131400   -7.1700 -135.8500       4.5       151       126        60
OIR    2025130    131400   -7.1700 -135.8600       4.5       151       129        60
OIR    2025130    131400   -7.1700 -135.8700       4.5       151       132        60
OIR    2025130    131400   -7.1700 -141.1100      24.1        50       128        60
OIR    2025130    131400   -7.1700 -141.1200      21.5        31       125        60
OIR    2025130    131400   -7.1700 -141.1300      19.9        30       129        60
OIR    2025130    131400   -7.1700 -141.1400      19.9        38       139        60
OIR    2025130    131400   -7.1700 -141.1800      22.0        38       144        60
OIR    2025130    131400   -7.1800 -135.8400       4.5       151       125        60
OIR    2025130    131400   -7.1800 -141.1100      20.6        31       143        60
OIR    2025130    131400   -7.1800 -141.1200      20.1        22       136        60
OIR    2025130    131400   -7.1800 -141.1300      20.0        22       141        60
OIR    2025130    131400   -7.1900 -135.3300       5.1       157       135        60
OIR    2025130    131400   -7.1900 -135.8400       4.5       150       135        60
OIR    2025130    131400   -7.2600 -135.2900       5.1       156       139        60
OIR    2025130    131400   -7.2600 -136.3100       5.0        90       137        60
OIR    2025130    131400   -7.2700 -136.1100       5.6       118       145        60
OIR    2025130    131400   -7.2800 -135.4700       5.0       156       160        60
OIR    2025130    131400   -7.2800 -135.4800       5.0       156       181        60
OIR    2025130    131400   -7.3000 -134.9600       5.6       167       121        60
OIR    2025130    131400   -7.3100 -134.9600       5.7       166       122        60
OIR    2025130    131400   -7.3200 -134.9600       5.7       164       134        60
OIR    2025130    131400   -7.3800 -135.7100       4.6       150       132        60
OIR    2025130    131400   -7.3900 -135.7100       4.6       150       143        60
OIR    2025130    131400   -7.4100 -135.6900       4.7       151       143        60
OIR    2025130    131400   -7.4600 -135.2200       5.2       155       145        60
OIR    2025130    131400   -7.7500 -136.1800       6.0       132       176        60
OIR    2025130    131400   -7.7600 -136.1800       6.0       132       124        60
OIR    2025130    131400   -7.7800 -137.7600      17.8       127       145        60
OIR    2025130    131400   -7.7900 -137.7000      17.8       135       143        60
OIR    2025130    131400   -7.7900 -137.7100      17.7       136       131        60
OIR    2025130    131400   -7.7900 -137.7200      18.5       139       130        60
OIR    2025130    131400   -7.7900 -137.7300      18.9       140       132        60
OIR    2025130    131400   -7.7900 -137.7400      18.6       142       132        60
OIR    2025130    131400   -7.7900 -137.7500      18.1       139       135        60
OIR    2025130    131400   -7.7900 -137.7600      17.4       130       141        60
OIR    2025130    131400   -7.7900 -137.7700      17.5       129       143        60
OIR    2025130    131400   -7.7900 -137.7800      20.2       139       138        60
OIR    2025130    131400   -7.7900 -137.7900      23.8       140       143        60
OIR    2025130    131400   -7.8000 -137.6800      17.9       135       141        60
OIR    2025130    131400   -7.8000 -137.6900      18.0       135       141        60
OIR    2025130    131400   -7.8000 -137.7000      17.9       135       136        60
OIR    2025130    131400   -7.8000 -137.7100      17.8       135       130        60
OIR    2025130    131400   -7.8000 -137.7200      18.0       136       129        60
OIR    2025130    131400   -7.8000 -137.7300      18.3       139       129        60
OIR    2025130    131400   -7.8000 -137.7400      17.4       138       129        60
OIR    2025130    131400   -7.8000 -137.7500      16.4       134       130        60
OIR    2025130    131400   -7.8000 -137.7600      15.9       126       134        60
OIR    2025130    131400   -7.8000 -137.7700      15.8       125       136        60
OIR    2025130    131400   -7.8000 -137.7800      18.3       135       134        60
OIR    2025130    131400   -7.8000 -137.7900      24.8       149       136        60
OIR    2025130    131400   -7.8000 -137.8000      30.4       156       141        60
OIR    2025130    131400   -7.8100 -136.2700       5.6       135       138        60
OIR    2025130    131400   -7.8100 -137.6700      17.8       134       133        60
OIR    2025130    131400   -7.8100 -137.6800      18.1       134       128        60
OIR    2025130    131400   -7.8100 -137.6900      18.1       134       128        60
OIR    2025130    131400   -7.8100 -137.7000      17.7       133       129        60
OIR    2025130    131400   -7.8100 -137.7100      17.2       132       129        60
OIR    2025130    131400   -7.8100 -137.7200      15.9       130       127        60
OIR    2025130    131400   -7.8100 -137.7300      13.2       123       126        60
OIR    2025130    131400   -7.8100 -137.7400      12.2       116       126        60
OIR    2025130    131400   -7.8100 -137.7500      11.8       111       126        60
OIR    2025130    131400   -7.8100 -137.7600      11.8       109       128        60
OIR    2025130    131400   -7.8100 -137.7700      12.1       110       129        60
OIR    2025130    131400   -7.8100 -137.7800      12.8       113       130        60
OIR    2025130    131400   -7.8100 -137.7900      15.4       123       130        60
OIR    2025130    131400   -7.8100 -137.8000      21.9       141       129        60
OIR    2025130    131400   -7.8100 -137.8100      27.8       155       143        60
OIR    2025130    131400   -7.8200 -137.6600      18.5       137       138        60
OIR    2025130    131400   -7.8200 -137.6700      18.2       133       129        60
OIR    2025130    131400   -7.8200 -137.6800      18.1       133       126        60
OIR    2025130    131400   -7.8200 -137.6900      17.4       132       126        60
OIR    2025130    131400   -7.8200 -137.7000      16.2       128       126        60
OIR    2025130    131400   -7.8200 -137.7100      14.3       122       125        60
OIR    2025130    131400   -7.8200 -137.7200      12.2       113       125        60
OIR    2025130    131400   -7.8200 -137.7300      11.5       109       124        60
OIR    2025130    131400   -7.8200 -137.7400      11.4       107       124        60
OIR    2025130    131400   -7.8200 -137.7500      11.3       107       124        60
OIR    2025130    131400   -7.8200 -137.7600      11.3       107       125        60
OIR    2025130    131400   -7.8200 -137.7700      11.2       107       126        60
OIR    2025130    131400   -7.8200 -137.7800      11.3       107       127        60
OIR    2025130    131400   -7.8200 -137.7900      11.8       107       129        60
OIR    2025130    131400   -7.8200 -137.8000      13.2       111       131        60
OIR    2025130    131400   -7.8200 -137.8100      15.9       118       136        60
OIR    2025130    131400   -7.8200 -137.8200      20.0       133       142        60
OIR    2025130    131400   -7.8300 -137.6400      18.7       175       140        60
OIR    2025130    131400   -7.8300 -137.6500      16.8       147       134        60
OIR    2025130    131400   -7.8300 -137.6600      18.1       132       129        60
OIR    2025130    131400   -7.8300 -137.6700      16.9       127       125        60
OIR    2025130    131400   -7.8300 -137.6800      15.2       121       124        60
OIR    2025130    131400   -7.8300 -137.6900      13.6       117       123        60
OIR    2025130    131400   -7.8300 -137.7000      12.7       111       123        60
OIR    2025130    131400   -7.8300 -137.7100      11.8       106       123        60
OIR    2025130    131400   -7.8300 -137.7200      11.5       105       122        60
OIR    2025130    131400   -7.8300 -137.7300      11.4       106       122        60
OIR    2025130    131400   -7.8300 -137.7400      11.3       106       122        60
OIR    2025130    131400   -7.8300 -137.7500      11.2       106       123        60
OIR    2025130    131400   -7.8300 -137.7600      11.2       106       123        60
OIR    2025130    131400   -7.8300 -137.7700      11.1       107       124        60
OIR    2025130    131400   -7.8300 -137.7800      11.1       107       125        60
OIR    2025130    131400   -7.8300 -137.7900      11.1       107       128        60
OIR    2025130    131400   -7.8300 -137.8000      11.3       107       132        60
OIR    2025130    131400   -7.8300 -137.8100      11.6       107       129        60
OIR    2025130    131400   -7.8300 -137.8200      12.3       112       132        60
OIR    2025130    131400   -7.8300 -137.8300      11.7       120       143        60
OIR    2025130    131400   -7.8400 -137.6200      11.4       130       137        60
OIR    2025130    131400   -7.8400 -137.6300      11.0       110       134        60
OIR    2025130    131400   -7.8400 -137.6400      11.6        93       130        60
OIR    2025130    131400   -7.8400 -137.6500      11.7       102       127        60
OIR    2025130    131400   -7.8400 -137.6600      12.6       100       124        60
OIR    2025130    131400   -7.8400 -137.6700      13.0       105       123        60
OIR    2025130    131400   -7.8400 -137.6800      13.2       108       122        60
OIR    2025130    131400   -7.8400 -137.6900      12.7       108       121        60
OIR    2025130    131400   -7.8400 -137.7000      12.1       106       120        60
OIR    2025130    131400   -7.8400 -137.7100      11.7       105       120        60
OIR    2025130    131400   -7.8400 -137.7200      11.5       105       121        60
OIR    2025130    131400   -7.8400 -137.7300      11.3       105       121        60
OIR    2025130    131400   -7.8400 -137.7400      11.3       106       122        60
OIR    2025130    131400   -7.8400 -137.7500      11.2       106       122        60
OIR    2025130    131400   -7.8400 -137.7600      11.1       106       122        60
OIR    2025130    131400   -7.8400 -137.7700      11.0       107       123        60
OIR    2025130    131400   -7.8400 -137.7800      11.0       107       124        60
OIR    2025130    131400   -7.8400 -137.7900      10.9       107       127        60
OIR    2025130    131400   -7.8400 -137.8000      10.9       108       130        60
OIR    2025130    131400   -7.8400 -137.8100      10.9       109       129        60
OIR    2025130    131400   -7.8400 -137.8200      10.1       117       130        60
OIR    2025130    131400   -7.8400 -137.8300       9.3       128       136        60
OIR    2025130    131400   -7.8400 -137.8400       9.1       143       142        60
OIR    2025130    131400   -7.8500 -137.6100      12.3        95       139        60
OIR    2025130    131400   -7.8500 -137.6200      12.4        96       129        60
OIR    2025130    131400   -7.8500 -137.6300      12.9        95       127        60
OIR    2025130    131400   -7.8500 -137.6400      13.0        95       125        60
OIR    2025130    131400   -7.8500 -137.6500      12.8        96       123        60
OIR    2025130    131400   -7.8500 -137.6600      12.8        98       122        60
OIR    2025130    131400   -7.8500 -137.6700      12.8       100       121        60
OIR    2025130    131400   -7.8500 -137.6800      12.7       103       120        60
OIR    2025130    131400   -7.8500 -137.6900      12.3       104       119        60
OIR    2025130    131400   -7.8500 -137.7000      12.0       104       119        60
OIR    2025130    131400   -7.8500 -137.7100      11.7       104       119        60
OIR    2025130    131400   -7.8500 -137.7200      11.5       104       120        60
OIR    2025130    131400   -7.8500 -137.7300      11.3       105       120        60
OIR    2025130    131400   -7.8500 -137.7400      11.2       105       121        60
OIR    2025130    131400   -7.8500 -137.7500      11.1       106       121        60
OIR    2025130    131400   -7.8500 -137.7600      10.9       106       121        60
OIR    2025130    131400   -7.8500 -137.7700      10.8       107       122        60
OIR    2025130    131400   -7.8500 -137.7800      10.7       107       123        60
OIR    2025130    131400   -7.8500 -137.7900      10.5       108       124        60
OIR    2025130    131400   -7.8500 -137.8000      10.4       108       127        60
OIR    2025130    131400   -7.8500 -137.8100      10.1       111       127        60
OIR    2025130    131400   -7.8500 -137.8200       9.0       122       127        60
OIR    2025130    131400   -7.8500 -137.8300       8.4       135       130        60
OIR    2025130    131400   -7.8500 -137.8400       8.5       146       134        60
OIR    2025130    131400   -7.8500 -137.8500       9.1       164       144        60
OIR    2025130    131400   -7.8600 -137.6000      16.6        85       137        60
OIR    2025130    131400   -7.8600 -137.6100      14.5        89       132        60
OIR    2025130    131400   -7.8600 -137.6200      13.6        92       128        60
OIR    2025130    131400   -7.8600 -137.6300      13.3        95       126        60
OIR    2025130    131400   -7.8600 -137.6400      13.2        95       124        60
OIR    2025130    131400   -7.8600 -137.6500      13.0        95       123        60
OIR    2025130    131400   -7.8600 -137.6600      12.9        96       121        60
OIR    2025130    131400   -7.8600 -137.6700      12.8        98       120        60
OIR    2025130    131400   -7.8600 -137.6800      12.6       100       119        60
OIR    2025130    131400   -7.8600 -137.6900      12.2       101       117        60
OIR    2025130    131400   -7.8600 -137.7000      11.9       102       119        60
OIR    2025130    131400   -7.8600 -137.7100      11.6       103       119        60
OIR    2025130    131400   -7.8600 -137.7200      11.4       103       119        60
OIR    2025130    131400   -7.8600 -137.7300      11.2       104       119        60
OIR    2025130    131400   -7.8600 -137.7400      11.1       104       119        60
OIR    2025130    131400   -7.8600 -137.7500      10.9       105       119        60
OIR    2025130    131400   -7.8600 -137.7600      10.6       105       120        60
OIR    2025130    131400   -7.8600 -137.7700      10.4       106       120        60
OIR    2025130    131400   -7.8600 -137.7800      10.2       107       121        60
OIR    2025130    131400   -7.8600 -137.7900      10.0       107       122        60
OIR    2025130    131400   -7.8600 -137.8000       9.9       109       122        60
OIR    2025130    131400   -7.8600 -137.8100       9.3       112       123        60
OIR    2025130    131400   -7.8600 -137.8200       8.3       122       125        60
OIR    2025130    131400   -7.8600 -137.8300       7.8       135       127        60
OIR    2025130    131400   -7.8600 -137.8400       7.9       143       129        60
OIR    2025130    131400   -7.8600 -137.8500       8.4       159       135        60
OIR    2025130    131400   -7.8600 -137.8600      10.4       180       138        60
OIR    2025130    131400   -7.8600 -137.8700      13.5       202       137        60
OIR    2025130    131400   -7.8600 -137.8800      22.2       239       143        60
OIR    2025130    131400   -7.8700 -137.5900      19.7        79       141        60
OIR    2025130    131400   -7.8700 -137.6000      17.5        84       132        60
OIR    2025130    131400   -7.8700 -137.6100      15.3        89       128        60
OIR    2025130    131400   -7.8700 -137.6200      14.5        91       125        60
OIR    2025130    131400   -7.8700 -137.6300      13.7        93       124        60
OIR    2025130    131400   -7.8700 -137.6400      13.4        94       123        60
OIR    2025130    131400   -7.8700 -137.6500      13.1        95       122        60
OIR    2025130    131400   -7.8700 -137.6600      13.0        95       121        60
OIR    2025130    131400   -7.8700 -137.6700      12.7        97       119        60
OIR    2025130    131400   -7.8700 -137.6800      12.5        98       119        60
OIR    2025130    131400   -7.8700 -137.6900      12.2        99       117        60
OIR    2025130    131400   -7.8700 -137.7000      11.8       100       119        60
OIR    2025130    131400   -7.8700 -137.7100      11.5       101       119        60
OIR    2025130    131400   -7.8700 -137.7200      11.3       102       119        60
OIR    2025130    131400   -7.8700 -137.7300      11.0       102       119        60
OIR    2025130    131400   -7.8700 -137.7400      10.8       103       117        60
OIR    2025130    131400   -7.8700 -137.7500      10.6       104       117        60
OIR    2025130    131400   -7.8700 -137.7600      10.3       104       119        60
OIR    2025130    131400   -7.8700 -137.7700      10.0       105       119        60
OIR    2025130    131400   -7.8700 -137.7800       9.8       106       120        60
OIR    2025130    131400   -7.8700 -137.7900       9.6       107       120        60
OIR    2025130    131400   -7.8700 -137.8000       9.3       108       121        60
OIR    2025130    131400   -7.8700 -137.8100       8.6       112       122        60
OIR    2025130    131400   -7.8700 -137.8200       7.8       120       123        60
OIR    2025130    131400   -7.8700 -137.8300       7.3       130       124        60
OIR    2025130    131400   -7.8700 -137.8400       7.1       137       125        60
OIR    2025130    131400   -7.8700 -137.8500       6.7       148       129        60
OIR    2025130    131400   -7.8700 -137.8600       6.6       169       131        60
OIR    2025130    131400   -7.8700 -137.8700       6.5       195       131        60
OIR    2025130    131400   -7.8700 -137.8800      15.3       234       136        60
OIR    2025130    131400   -7.8700 -137.8900      23.9       239       141        60
OIR    2025130    131400   -7.8800 -137.5800      20.3        74       141        60
OIR    2025130    131400   -7.8800 -137.5900      19.5        79       136        60
OIR    2025130    131400   -7.8800 -137.6000      18.2        82       131        60
OIR    2025130    131400   -7.8800 -137.6100      16.0        87       126        60
OIR    2025130    131400   -7.8800 -137.6200      15.0        89       122        60
OIR    2025130    131400   -7.8800 -137.6300      14.1        91       122        60
OIR    2025130    131400   -7.8800 -137.6400      13.6        92       122        60
OIR    2025130    131400   -7.8800 -137.6500      13.2        93       121        60
OIR    2025130    131400   -7.8800 -137.6600      13.0        94       121        60
OIR    2025130    131400   -7.8800 -137.6700      12.7        95       119        60
OIR    2025130    131400   -7.8800 -137.6800      12.5        96       119        60
OIR    2025130    131400   -7.8800 -137.6900      12.1        97       119        60
OIR    2025130    131400   -7.8800 -137.7000      11.8        98       120        60
OIR    2025130    131400   -7.8800 -137.7100      11.4        99       120        60
OIR    2025130    131400   -7.8800 -137.7200      11.1       100       119        60
OIR    2025130    131400   -7.8800 -137.7300      10.8       101       119        60
OIR    2025130    131400   -7.8800 -137.7400      10.5       101       117        60
OIR    2025130    131400   -7.8800 -137.7500      10.2       102       117        60
OIR    2025130    131400   -7.8800 -137.7600       9.9       102       117        60
OIR    2025130    131400   -7.8800 -137.7700       9.6       103       119        60
OIR    2025130    131400   -7.8800 -137.7800       9.4       104       119        60
OIR    2025130    131400   -7.8800 -137.7900       9.2       106       120        60
OIR    2025130    131400   -7.8800 -137.8000       8.7       108       122        60
OIR    2025130    131400   -7.8800 -137.8100       7.9       111       122        60
OIR    2025130    131400   -7.8800 -137.8200       7.3       116       121        60
OIR    2025130    131400   -7.8800 -137.8300       6.8       123       121        60
OIR    2025130    131400   -7.8800 -137.8400       6.2       130       122        60
OIR    2025130    131400   -7.8800 -137.8500       5.4       138       125        60
OIR    2025130    131400   -7.8800 -137.8600       4.8       151       127        60
OIR    2025130    131400   -7.8800 -137.8700       4.5       166       128        60
OIR    2025130    131400   -7.8800 -137.8800       5.7       199       135        60
OIR    2025130    131400   -7.8800 -137.8900       9.0       214       142        60
OIR    2025130    131400   -7.8800 -137.9000      12.9       215       146        60
OIR    2025130    131400   -7.8900 -137.5800      19.6        74       136        60
OIR    2025130    131400   -7.8900 -137.5900      18.9        78       133        60
OIR    2025130    131400   -7.8900 -137.6000      17.9        80       130        60
OIR    2025130    131400   -7.8900 -137.6100      16.3        84       127        60
OIR    2025130    131400   -7.8900 -137.6200      15.3        86       123        60
OIR    2025130    131400   -7.8900 -137.6300      14.5        88       122        60
OIR    2025130    131400   -7.8900 -137.6400      13.9        90       121        60
OIR    2025130    131400   -7.8900 -137.6500      13.3        92       120        60
OIR    2025130    131400   -7.8900 -137.6600      13.0        92       119        60
OIR    2025130    131400   -7.8900 -137.6700      12.8        93       119        60
OIR    2025130    131400   -7.8900 -137.6800      12.4        94       119        60
OIR    2025130    131400   -7.8900 -137.6900      12.1        95       119        60
OIR    2025130    131400   -7.8900 -137.7000      11.7        97       120        60
OIR    2025130    131400   -7.8900 -137.7100      11.3        98       120        60
OIR    2025130    131400   -7.8900 -137.7200      10.9        98       119        60
OIR    2025130    131400   -7.8900 -137.7300      10.6        99       117        60
OIR    2025130    131400   -7.8900 -137.7400      10.3       100       117        60
OIR    2025130    131400   -7.8900 -137.7500       9.9       100       116        60
OIR    2025130    131400   -7.8900 -137.7600       9.6       101       116        60
OIR    2025130    131400   -7.8900 -137.7700       9.3       102       117        60
OIR    2025130    131400   -7.8900 -137.7800       9.0       103       119        60
OIR    2025130    131400   -7.8900 -137.7900       8.7       104       120        60
OIR    2025130    131400   -7.8900 -137.8000       8.0       106       121        60
OIR    2025130    131400   -7.8900 -137.8100       7.3       109       121        60
OIR    2025130    131400   -7.8900 -137.8200       6.7       113       121        60
OIR    2025130    131400   -7.8900 -137.8300       6.2       118       121        60
OIR    2025130    131400   -7.8900 -137.8400       5.4       124       121        60
OIR    2025130    131400   -7.8900 -137.8500       4.8       134       122        60
OIR    2025130    131400   -7.8900 -137.8600       4.5       147       124        60
OIR    2025130    131400   -7.8900 -137.8700       4.4       158       124        60
OIR    2025130    131400   -7.8900 -137.8800       4.6       171       129        60
OIR    2025130    131400   -7.8900 -137.8900       5.6       182       133        60
OIR    2025130    131400   -7.8900 -137.9000       7.5       190       134        60
OIR    2025130    131400   -7.8900 -137.9100       7.1       189       133        60
OIR    2025130    131400   -7.8900 -137.9200       5.7       176       137        60
OIR    2025130    131400   -7.8900 -137.9300       5.3       166       146        60
OIR    2025130    131400   -7.9000 -137.5800      19.6        77       132        60
OIR    2025130    131400   -7.9000 -137.5900      19.1        78       131        60
OIR    2025130    131400   -7.9000 -137.6000      17.9        79       130        60
OIR    2025130    131400   -7.9000 -137.6100      16.7        81       128        60
OIR    2025130    131400   -7.9000 -137.6200      15.8        84       126        60
OIR    2025130    131400   -7.9000 -137.6300      15.1        85       124        60
OIR    2025130    131400   -7.9000 -137.6400      14.4        87       121        60
OIR    2025130    131400   -7.9000 -137.6500      13.5        90       116        60
OIR    2025130    131400   -7.9000 -137.6600      13.1        91       117        60
OIR    2025130    131400   -7.9000 -137.6700      12.8        92       119        60
OIR    2025130    131400   -7.9000 -137.6800      12.5        93       120        60
OIR    2025130    131400   -7.9000 -137.6900      12.1        94       120        60
OIR    2025130    131400   -7.9000 -137.7000      11.7        95       120        60
OIR    2025130    131400   -7.9000 -137.7100      11.2        96       120        60
OIR    2025130    131400   -7.9000 -137.7200      10.8        97       119        60
OIR    2025130    131400   -7.9000 -137.7300      10.4        97       117        60
OIR    2025130    131400   -7.9000 -137.7400      10.0        98       116        60
OIR    2025130    131400   -7.9000 -137.7500       9.7        99       116        60
OIR    2025130    131400   -7.9000 -137.7600       9.3        99       115        60
OIR    2025130    131400   -7.9000 -137.7700       9.0       100       116        60
OIR    2025130    131400   -7.9000 -137.7800       8.5       101       119        60
OIR    2025130    131400   -7.9000 -137.7900       7.9       102       120        60
OIR    2025130    131400   -7.9000 -137.8000       7.1       104       119        60
OIR    2025130    131400   -7.9000 -137.8100       6.5       106       120        60
OIR    2025130    131400   -7.9000 -137.8200       6.0       110       120        60
OIR    2025130    131400   -7.9000 -137.8300       5.5       115       121        60
OIR    2025130    131400   -7.9000 -137.8400       4.8       122       121        60
OIR    2025130    131400   -7.9000 -137.8500       4.4       131       121        60
OIR    2025130    131400   -7.9000 -137.8600       4.2       145       121        60
OIR    2025130    131400   -7.9000 -137.8700       4.1       158       120        60
OIR    2025130    131400   -7.9000 -137.8800       4.4       168       121        60
OIR    2025130    131400   -7.9000 -137.8900       5.1       175       121        60
OIR    2025130    131400   -7.9000 -137.9000       5.7       178       122        60
OIR    2025130    131400   -7.9000 -137.9100       5.9       176       122        60
OIR    2025130    131400   -7.9000 -137.9200       6.0       174       129        60
OIR    2025130    131400   -7.9000 -137.9300       5.9       173       138        60
OIR    2025130    131400   -7.9100 -137.5800      19.7        77       133        60
OIR    2025130    131400   -7.9100 -137.5900      19.1        78       131        60
OIR    2025130    131400   -7.9100 -137.6000      18.2        78       129        60
OIR    2025130    131400   -7.9100 -137.6100      17.4        80       127        60
OIR    2025130    131400   -7.9100 -137.6200      16.3        83       125        60
OIR    2025130    131400   -7.9100 -137.6300      15.7        84       122        60
OIR    2025130    131400   -7.9100 -137.6400      14.9        86       120        60
OIR    2025130    131400   -7.9100 -137.6500      13.8        88       117        60
OIR    2025130    131400   -7.9100 -137.6600      13.3        89       117        60
OIR    2025130    131400   -7.9100 -137.6700      12.9        90       119        60
OIR    2025130    131400   -7.9100 -137.6800      12.5        91       119        60
OIR    2025130    131400   -7.9100 -137.6900      12.1        92       117        60
OIR    2025130    131400   -7.9100 -137.7000      11.7        93       117        60
OIR    2025130    131400   -7.9100 -137.7100      11.1        94       119        60
OIR    2025130    131400   -7.9100 -137.7200      10.7        95       117        60
OIR    2025130    131400   -7.9100 -137.7300      10.2        96       117        60
OIR    2025130    131400   -7.9100 -137.7400       9.8        96       116        60
OIR    2025130    131400   -7.9100 -137.7500       9.4        97       116        60
OIR    2025130    131400   -7.9100 -137.7600       8.9        97       116        60
OIR    2025130    131400   -7.9100 -137.7700       8.5        98       116        60
OIR    2025130    131400   -7.9100 -137.7800       7.9        98       116        60
OIR    2025130    131400   -7.9100 -137.7900       7.1        99       116        60
OIR    2025130    131400   -7.9100 -137.8000       6.3       100       117        60
OIR    2025130    131400   -7.9100 -137.8100       5.8       102       120        60
OIR    2025130    131400   -7.9100 -137.8200       5.4       106       120        60
OIR    2025130    131400   -7.9100 -137.8300       4.9       111       119        60
OIR    2025130    131400   -7.9100 -137.8400       4.2       120       117        60
OIR    2025130    131400   -7.9100 -137.8800       4.3       169       117        60
OIR    2025130    131400   -7.9100 -137.8900       4.8       174       117        60
OIR    2025130    131400   -7.9100 -137.9000       5.4       176       117        60
OIR    2025130    131400   -7.9100 -137.9100       5.7       176       119        60
OIR    2025130    131400   -7.9100 -137.9200       5.9       176       124        60
OIR    2025130    131400   -7.9100 -137.9300       6.5       179       132        60
OIR    2025130    131400   -7.9200 -137.5700      26.5        82       144        60
OIR    2025130    131400   -7.9200 -137.5800      19.4        76       133        60
OIR    2025130    131400   -7.9200 -137.5900      18.9        77       131        60
OIR    2025130    131400   -7.9200 -137.6000      18.5        77       129        60
OIR    2025130    131400   -7.9200 -137.6100      17.8        79       126        60
OIR    2025130    131400   -7.9200 -137.6200      16.7        82       124        60
OIR    2025130    131400   -7.9200 -137.6300      16.0        83       121        60
OIR    2025130    131400   -7.9200 -137.6400      15.4        84       120        60
OIR    2025130    131400   -7.9200 -137.6500      14.2        86       119        60
OIR    2025130    131400   -7.9200 -137.6600      13.6        87       119        60
OIR    2025130    131400   -7.9200 -137.6700      13.0        88       119        60
OIR    2025130    131400   -7.9200 -137.6800      12.6        89       117        60
OIR    2025130    131400   -7.9200 -137.6900      12.1        90       116        60
OIR    2025130    131400   -7.9200 -137.7000      11.7        91       117        60
OIR    2025130    131400   -7.9200 -137.7100      11.1        92       117        60
OIR    2025130    131400   -7.9200 -137.7200      10.5        93       117        60
OIR    2025130    131400   -7.9200 -137.7300      10.0        94       117        60
OIR    2025130    131400   -7.9200 -137.7400       9.6        94       116        60
OIR    2025130    131400   -7.9200 -137.7500       9.0        94       116        60
OIR    2025130    131400   -7.9200 -137.7600       8.6        95       116        60
OIR    2025130    131400   -7.9200 -137.7700       8.0        95       115        60
OIR    2025130    131400   -7.9200 -137.7800       7.0        94       113        60
OIR    2025130    131400   -7.9200 -137.7900       6.2        94       115        60
OIR    2025130    131400   -7.9200 -137.8000       5.6        95       117        60
OIR    2025130    131400   -7.9200 -137.8100       5.1        97       119        60
OIR    2025130    131400   -7.9200 -137.8200       4.6       101       120        60
OIR    2025130    131400   -7.9200 -137.8900       4.4       175       115        60
OIR    2025130    131400   -7.9200 -137.9000       4.9       177       115        60
OIR    2025130    131400   -7.9200 -137.9100       5.3       179       116        60
OIR    2025130    131400   -7.9200 -137.9200       5.9       183       119        60
OIR    2025130    131400   -7.9200 -137.9300       7.2       195       126        60
OIR    2025130    131400   -7.9200 -137.9400       7.6       205       142        60
OIR    2025130    131400   -7.9300 -137.5600      30.0        87       142        60
OIR    2025130    131400   -7.9300 -137.5700      23.4        77       136        60
OIR    2025130    131400   -7.9300 -137.5800      20.0        76       130        60
OIR    2025130    131400   -7.9300 -137.5900      19.2        76       129        60
OIR    2025130    131400   -7.9300 -137.6000      18.8        77       128        60
OIR    2025130    131400   -7.9300 -137.6100      18.3        78       125        60
OIR    2025130    131400   -7.9300 -137.6200      17.0        80       123        60
OIR    2025130    131400   -7.9300 -137.6300      16.2        82       122        60
OIR    2025130    131400   -7.9300 -137.6400      15.6        83       120        60
OIR    2025130    131400   -7.9300 -137.6500      14.6        84       120        60
OIR    2025130    131400   -7.9300 -137.6600      13.9        85       119        60
OIR    2025130    131400   -7.9300 -137.6700      13.2        86       119        60
OIR    2025130    131400   -7.9300 -137.6800      12.7        87       117        60
OIR    2025130    131400   -7.9300 -137.6900      12.2        88       116        60
OIR    2025130    131400   -7.9300 -137.7000      11.7        89       119        60
OIR    2025130    131400   -7.9300 -137.7100      11.0        90       120        60
OIR    2025130    131400   -7.9300 -137.7200      10.4        90       119        60
OIR    2025130    131400   -7.9300 -137.7300       9.9        91       119        60
OIR    2025130    131400   -7.9300 -137.7400       9.3        92       119        60
OIR    2025130    131400   -7.9300 -137.7500       8.7        92       117        60
OIR    2025130    131400   -7.9300 -137.7600       8.1        91       116        60
OIR    2025130    131400   -7.9300 -137.7700       7.2        90       116        60
OIR    2025130    131400   -7.9300 -137.7800       6.3        89       115        60
OIR    2025130    131400   -7.9300 -137.7900       5.4        88       116        60
OIR    2025130    131400   -7.9300 -137.8000       4.8        88       117        60
OIR    2025130    131400   -7.9300 -137.8100       4.2        88       119        60
OIR    2025130    131400   -7.9300 -137.9000       4.3       182       114        60
OIR    2025130    131400   -7.9300 -137.9100       4.8       187       116        60
OIR    2025130    131400   -7.9300 -137.9200       5.9       192       117        60
OIR    2025130    131400   -7.9300 -137.9300       7.7       201       122        60
OIR    2025130    131400   -7.9300 -137.9400       7.9       202       130        60
OIR    2025130    131400   -7.9300 -137.9500       7.8       201       142        60
OIR    2025130    131400   -7.9400 -137.5500      27.9        85       136        60
OIR    2025130    131400   -7.9400 -137.5600      24.1        78       132        60
OIR    2025130    131400   -7.9400 -137.5700      21.8        75       130        60
OIR    2025130    131400   -7.9400 -137.5800      20.8        75       128        60
OIR    2025130    131400   -7.9400 -137.5900      19.7        75       127        60
OIR    2025130    131400   -7.9400 -137.6000      19.2        76       127        60
OIR    2025130    131400   -7.9400 -137.6100      18.7        77       125        60
OIR    2025130    131400   -7.9400 -137.6200      17.4        79       123        60
OIR    2025130    131400   -7.9400 -137.6300      16.4        81       122        60
OIR    2025130    131400   -7.9400 -137.6400      15.8        81       121        60
OIR    2025130    131400   -7.9400 -137.6500      14.9        82       121        60
OIR    2025130    131400   -7.9400 -137.6600      14.1        83       120        60
OIR    2025130    131400   -7.9400 -137.6700      13.4        84       119        60
OIR    2025130    131400   -7.9400 -137.6800      12.8        84       117        60
OIR    2025130    131400   -7.9400 -137.6900      12.2        85       116        60
OIR    2025130    131400   -7.9400 -137.7000      11.7        86       120        60
OIR    2025130    131400   -7.9400 -137.7100      11.0        86       121        60
OIR    2025130    131400   -7.9400 -137.7200      10.3        87       120        60
OIR    2025130    131400   -7.9400 -137.7300       9.7        87       119        60
OIR    2025130    131400   -7.9400 -137.7400       9.1        87       120        60
OIR    2025130    131400   -7.9400 -137.7500       8.3        87       120        60
OIR    2025130    131400   -7.9400 -137.7600       7.5        85       117        60
OIR    2025130    131400   -7.9400 -137.7700       6.6        84       116        60
OIR    2025130    131400   -7.9400 -137.7800       5.5        82       116        60
OIR    2025130    131400   -7.9400 -137.7900       4.6        79       116        60
OIR    2025130    131400   -7.9400 -137.8000       4.0        76       117        60
OIR    2025130    131400   -7.9400 -137.9100       4.4       196       117        60
OIR    2025130    131400   -7.9400 -137.9200       6.0       199       116        60
OIR    2025130    131400   -7.9400 -137.9300       7.5       201       116        60
OIR    2025130    131400   -7.9400 -137.9400       7.8       200       120        60
OIR    2025130    131400   -7.9400 -137.9500       8.4       200       132        60
OIR    2025130    131400   -7.9500 -137.5400      25.9        84       141        60
OIR    2025130    131400   -7.9500 -137.5500      25.5        82       131        60
OIR    2025130    131400   -7.9500 -137.5600      22.5        76       129        60
OIR    2025130    131400   -7.9500 -137.5700      21.7        75       128        60
OIR    2025130    131400   -7.9500 -137.5800      21.0        74       127        60
OIR    2025130    131400   -7.9500 -137.5900      20.2        74       127        60
OIR    2025130    131400   -7.9500 -137.6000      19.6        75       126        60
OIR    2025130    131400   -7.9500 -137.6100      18.9        76       125        60
OIR    2025130    131400   -7.9500 -137.6200      17.7        77       124        60
OIR    2025130    131400   -7.9500 -137.6300      16.6        79       124        60
OIR    2025130    131400   -7.9500 -137.6400      15.9        79       123        60
OIR    2025130    131400   -7.9500 -137.6500      15.0        80       122        60
OIR    2025130    131400   -7.9500 -137.6600      14.3        81       121        60
OIR    2025130    131400   -7.9500 -137.6700      13.6        81       120        60
OIR    2025130    131400   -7.9500 -137.6800      13.0        82       120        60
OIR    2025130    131400   -7.9500 -137.6900      12.3        83       120        60
OIR    2025130    131400   -7.9500 -137.7000      11.6        83       122        60
OIR    2025130    131400   -7.9500 -137.7100      10.9        83       123        60
OIR    2025130    131400   -7.9500 -137.7200      10.2        83       122        60
OIR    2025130    131400   -7.9500 -137.7300       9.5        82       121        60
OIR    2025130    131400   -7.9500 -137.7400       8.8        81       120        60
OIR    2025130    131400   -7.9500 -137.7500       8.0        80       120        60
OIR    2025130    131400   -7.9500 -137.7600       7.1        78       121        60
OIR    2025130    131400   -7.9500 -137.7700       6.1        76       119        60
OIR    2025130    131400   -7.9500 -137.7800       4.9        72       116        60
OIR    2025130    131400   -7.9500 -137.9100       4.2       205       116        60
OIR    2025130    131400   -7.9500 -137.9200       6.0       205       115        60
OIR    2025130    131400   -7.9500 -137.9300       7.3       204       116        60
OIR    2025130    131400   -7.9500 -137.9400       7.9       202       120        60
OIR    2025130    131400   -7.9500 -137.9500       9.0       202       129        60
OIR    2025130    131400   -7.9500 -137.9600       9.3       186       140        60
OIR    2025130    131400   -7.9600 -137.5400      25.5        83       136        60
OIR    2025130    131400   -7.9600 -137.5500      23.5        79       128        60
OIR    2025130    131400   -7.9600 -137.5600      22.3        74       127        60
OIR    2025130    131400   -7.9600 -137.5700      21.9        74       126        60
OIR    2025130    131400   -7.9600 -137.5800      21.2        73       126        60
OIR    2025130    131400   -7.9600 -137.5900      20.6        73       126        60
OIR    2025130    131400   -7.9600 -137.6000      20.0        74       125        60
OIR    2025130    131400   -7.9600 -137.6100      19.1        74       125        60
OIR    2025130    131400   -7.9600 -137.6200      18.1        75       124        60
OIR    2025130    131400   -7.9600 -137.6300      17.0        76       124        60
OIR    2025130    131400   -7.9600 -137.6400      16.1        77       123        60
OIR    2025130    131400   -7.9600 -137.6500      15.2        77       122        60
OIR    2025130    131400   -7.9600 -137.6600      14.5        78       121        60
OIR    2025130    131400   -7.9600 -137.6700      13.9        79       120        60
OIR    2025130    131400   -7.9600 -137.6800      13.2        79       120        60
OIR    2025130    131400   -7.9600 -137.6900      12.4        80       121        60
OIR    2025130    131400   -7.9600 -137.7000      11.6        80       122        60
OIR    2025130    131400   -7.9600 -137.7100      10.9        79       123        60
OIR    2025130    131400   -7.9600 -137.7200      10.0        78       122        60
OIR    2025130    131400   -7.9600 -137.7300       9.2        76       121        60
OIR    2025130    131400   -7.9600 -137.7400       8.6        74       121        60
OIR    2025130    131400   -7.9600 -137.7500       7.8        72       121        60
OIR    2025130    131400   -7.9600 -137.7600       6.9        70       121        60
OIR    2025130    131400   -7.9600 -137.7700       5.8        67       120        60
OIR    2025130    131400   -7.9600 -137.7800       4.5        58       117        60
OIR    2025130    131400   -7.9600 -137.8200       4.1       348       116        60
OIR    2025130    131400   -7.9600 -137.8300       4.1       345       115        60
OIR    2025130    131400   -7.9600 -137.8400       4.1       347       113        60
OIR    2025130    131400   -7.9600 -137.9100       4.1       216       115        60
OIR    2025130    131400   -7.9600 -137.9200       5.9       211       115        60
OIR    2025130    131400   -7.9600 -137.9300       7.3       209       116        60
OIR    2025130    131400   -7.9600 -137.9400       8.3       210       119        60
OIR    2025130    131400   -7.9600 -137.9500       9.3       210       126        60
OIR    2025130    131400   -7.9600 -137.9600       9.8       209       134        60
OIR    2025130    131400   -7.9600 -137.9700      10.6       212       144        60
OIR    2025130    131400   -7.9700 -137.5300      26.1        80       136        60
OIR    2025130    131400   -7.9700 -137.5400      25.0        79       130        60
OIR    2025130    131400   -7.9700 -137.5500      23.3        75       127        60
OIR    2025130    131400   -7.9700 -137.5600      22.5        73       126        60
OIR    2025130    131400   -7.9700 -137.5700      22.1        72       125        60
OIR    2025130    131400   -7.9700 -137.5800      21.6        72       124        60
OIR    2025130    131400   -7.9700 -137.5900      20.9        72       124        60
OIR    2025130    131400   -7.9700 -137.6000      20.4        72       124        60
OIR    2025130    131400   -7.9700 -137.6100      19.4        72       124        60
OIR    2025130    131400   -7.9700 -137.6200      18.6        73       123        60
OIR    2025130    131400   -7.9700 -137.6300      17.6        73       123        60
OIR    2025130    131400   -7.9700 -137.6400      16.6        74       123        60
OIR    2025130    131400   -7.9700 -137.6500      15.7        74       123        60
OIR    2025130    131400   -7.9700 -137.6600      14.9        75       122        60
OIR    2025130    131400   -7.9700 -137.6700      14.2        75       120        60
OIR    2025130    131400   -7.9700 -137.6800      13.5        76       120        60
OIR    2025130    131400   -7.9700 -137.6900      12.5        76       121        60
OIR    2025130    131400   -7.9700 -137.7000      11.7        76       122        60
OIR    2025130    131400   -7.9700 -137.7100      10.9        75       122        60
OIR    2025130    131400   -7.9700 -137.7200       9.9        73       121        60
OIR    2025130    131400   -7.9700 -137.7300       9.1        71       121        60
OIR    2025130    131400   -7.9700 -137.7400       8.4        69       121        60
OIR    2025130    131400   -7.9700 -137.7500       7.7        67       120        60
OIR    2025130    131400   -7.9700 -137.7600       7.0        65       120        60
OIR    2025130    131400   -7.9700 -137.7700       5.8        58       119        60
OIR    2025130    131400   -7.9700 -137.7800       4.6        40       116        60
OIR    2025130    131400   -7.9700 -137.7900       4.3        11       116        60
OIR    2025130    131400   -7.9700 -137.8000       4.8       354       116        60
OIR    2025130    131400   -7.9700 -137.8100       5.2       344       115        60
OIR    2025130    131400   -7.9700 -137.8200       5.4       339       113        60
OIR    2025130    131400   -7.9700 -137.8300       5.4       336       111        60
OIR    2025130    131400   -7.9700 -137.8400       5.3       338       109        60
OIR    2025130    131400   -7.9700 -137.8500       5.4       339       107        60
OIR    2025130    131400   -7.9700 -137.8600       5.8       335       105        60
OIR    2025130    131400   -7.9700 -137.8700       5.8       329       104        60
OIR    2025130    131400   -7.9700 -137.8800       5.2       325       108        60
OIR    2025130    131400   -7.9700 -137.9200       5.6       218       115        60
OIR    2025130    131400   -7.9700 -137.9300       7.1       215       116        60
OIR    2025130    131400   -7.9700 -137.9400       8.4       214       119        60
OIR    2025130    131400   -7.9700 -137.9500       9.1       213       124        60
OIR    2025130    131400   -7.9700 -137.9600       9.8       213       129        60
OIR    2025130    131400   -7.9700 -137.9700      10.1       215       136        60
OIR    2025130    131400   -7.9700 -137.9800      12.1       227       143        60
OIR    2025130    131400   -7.9800 -137.5200      27.6        80       143        60
OIR    2025130    131400   -7.9800 -137.5300      26.1        77       131        60
OIR    2025130    131400   -7.9800 -137.5400      25.0        76       126        60
OIR    2025130    131400   -7.9800 -137.5500      23.6        73       125        60
OIR    2025130    131400   -7.9800 -137.5600      22.9        72       125        60
OIR    2025130    131400   -7.9800 -137.5700      22.4        71       124        60
OIR    2025130    131400   -7.9800 -137.5800      22.0        71       123        60
OIR    2025130    131400   -7.9800 -137.5900      21.4        70       123        60
OIR    2025130    131400   -7.9800 -137.6000      20.8        70       123        60
OIR    2025130    131400   -7.9800 -137.6100      19.9        70       122        60
OIR    2025130    131400   -7.9800 -137.6200      19.1        70       122        60
OIR    2025130    131400   -7.9800 -137.6300      18.2        71       123        60
OIR    2025130    131400   -7.9800 -137.6400      17.3        71       123        60
OIR    2025130    131400   -7.9800 -137.6500      16.4        71       123        60
OIR    2025130    131400   -7.9800 -137.6600      15.6        70       121        60
OIR    2025130    131400   -7.9800 -137.6700      14.9        70       120        60
OIR    2025130    131400   -7.9800 -137.6800      14.0        71       120        60
OIR    2025130    131400   -7.9800 -137.6900      12.9        71       121        60
OIR    2025130    131400   -7.9800 -137.7000      11.7        72       122        60
OIR    2025130    131400   -7.9800 -137.7100      10.8        71       122        60
OIR    2025130    131400   -7.9800 -137.7200       9.8        69       122        60
OIR    2025130    131400   -7.9800 -137.7300       9.0        67       122        60
OIR    2025130    131400   -7.9800 -137.7400       8.3        65       120        60
OIR    2025130    131400   -7.9800 -137.7500       7.6        63       119        60
OIR    2025130    131400   -7.9800 -137.7600       7.0        60       119        60
OIR    2025130    131400   -7.9800 -137.7700       5.4        44       117        60
OIR    2025130    131400   -7.9800 -137.7800       5.0        18       116        60
OIR    2025130    131400   -7.9800 -137.7900       5.5       356       116        60
OIR    2025130    131400   -7.9800 -137.8000       6.0       345       116        60
OIR    2025130    131400   -7.9800 -137.8100       6.3       339       115        60
OIR    2025130    131400   -7.9800 -137.8200       6.4       336       113        60
OIR    2025130    131400   -7.9800 -137.8300       6.9       332       111        60
OIR    2025130    131400   -7.9800 -137.8400       7.2       330       109        60
OIR    2025130    131400   -7.9800 -137.8500       7.5       330       107        60
OIR    2025130    131400   -7.9800 -137.8600       8.0       327       105        60
OIR    2025130    131400   -7.9800 -137.8700       8.1       326       105        60
OIR    2025130    131400   -7.9800 -137.8800       7.8       325       109        60
OIR    2025130    131400   -7.9800 -137.8900       7.1       321       113        60
OIR    2025130    131400   -7.9800 -137.9000       5.1       306       114        60
OIR    2025130    131400   -7.9800 -137.9200       4.9       233       116        60
OIR    2025130    131400   -7.9800 -137.9300       6.3       224       119        60
OIR    2025130    131400   -7.9800 -137.9400       7.4       221       121        60
OIR    2025130    131400   -7.9800 -137.9500       8.2       217       124        60
OIR    2025130    131400   -7.9800 -137.9600       8.8       216       128        60
OIR    2025130    131400   -7.9800 -137.9700       9.5       216       132        60
OIR    2025130    131400   -7.9800 -137.9800      11.8       215       136        60
OIR    2025130    131400   -7.9800 -137.9900      15.6       200       146        60
OIR    2025130    131400   -7.9900 -137.5200      26.0        73       142        60
OIR    2025130    131400   -7.9900 -137.5300      25.7        73       131        60
OIR    2025130    131400   -7.9900 -137.5400      25.1        72       123        60
OIR    2025130    131400   -7.9900 -137.5500      24.3        71       122        60
OIR    2025130    131400   -7.9900 -137.5600      23.5        70       124        60
OIR    2025130    131400   -7.9900 -137.5700      23.0        69       123        60
OIR    2025130    131400   -7.9900 -137.5800      22.5        69       122        60
OIR    2025130    131400   -7.9900 -137.5900      21.9        69       122        60
OIR    2025130    131400   -7.9900 -137.6000      21.4        68       121        60
OIR    2025130    131400   -7.9900 -137.6100      20.6        68       121        60
OIR    2025130    131400   -7.9900 -137.6200      19.7        68       122        60
OIR    2025130    131400   -7.9900 -137.6300      18.9        68       122        60
OIR    2025130    131400   -7.9900 -137.6400      18.0        68       122        60
OIR    2025130    131400   -7.9900 -137.6500      17.1        67       122        60
OIR    2025130    131400   -7.9900 -137.6600      16.3        67       121        60
OIR    2025130    131400   -7.9900 -137.6700      15.4        67       119        60
OIR    2025130    131400   -7.9900 -137.6800      14.6        67       119        60
OIR    2025130    131400   -7.9900 -137.6900      13.5        67       121        60
OIR    2025130    131400   -7.9900 -137.7000      11.9        68       122        60
OIR    2025130    131400   -7.9900 -137.7100      10.9        67       122        60
OIR    2025130    131400   -7.9900 -137.7200       9.9        66       123        60
OIR    2025130    131400   -7.9900 -137.7300       9.0        64       123        60
OIR    2025130    131400   -7.9900 -137.7400       8.3        62       119        60
OIR    2025130    131400   -7.9900 -137.7500       7.6        59       117        60
OIR    2025130    131400   -7.9900 -137.7600       6.8        53       120        60
OIR    2025130    131400   -7.9900 -137.7700       5.5        24       117        60
OIR    2025130    131400   -7.9900 -137.7800       5.7         1       116        60
OIR    2025130    131400   -7.9900 -137.7900       6.4       347       116        60
OIR    2025130    131400   -7.9900 -137.8000       6.9       339       116        60
OIR    2025130    131400   -7.9900 -137.8100       7.2       335       116        60
OIR    2025130    131400   -7.9900 -137.8200       7.5       333       115        60
OIR    2025130    131400   -7.9900 -137.8300       7.9       329       113        60
OIR    2025130    131400   -7.9900 -137.8400       8.1       327       110        60
OIR    2025130    131400   -7.9900 -137.8500       8.3       326       108        60
OIR    2025130    131400   -7.9900 -137.8600       8.5       325       107        60
OIR    2025130    131400   -7.9900 -137.8700       8.6       325       108        60
OIR    2025130    131400   -7.9900 -137.8800       8.5       324       112        60
OIR    2025130    131400   -7.9900 -137.8900       8.3       323       116        60
OIR    2025130    131400   -7.9900 -137.9000       7.4       318       117        60
OIR    2025130    131400   -7.9900 -137.9100       5.3       300       117        60
OIR    2025130    131400   -7.9900 -137.9200       4.3       267       119        60
OIR    2025130    131400   -7.9900 -137.9300       5.2       243       121        60
OIR    2025130    131400   -7.9900 -137.9400       6.4       231       124        60
OIR    2025130    131400   -7.9900 -137.9500       7.5       223       126        60
OIR    2025130    131400   -7.9900 -137.9600       8.3       219       129        60
OIR    2025130    131400   -7.9900 -137.9700       8.9       217       131        60
OIR    2025130    131400   -7.9900 -137.9800       9.5       211       134        60
OIR    2025130    131400   -7.9900 -137.9900      16.3       201       143        60
OIR    2025130    131400   -8.0000 -137.5200      25.3        70       141        60
OIR    2025130    131400   -8.0000 -137.5300      25.5        70       131        60
OIR    2025130    131400   -8.0000 -137.5400      25.4        69       125        60
OIR    2025130    131400   -8.0000 -137.5500      25.0        69       123        60
OIR    2025130    131400   -8.0000 -137.5600      24.3        69       123        60
OIR    2025130    131400   -8.0000 -137.5700      23.6        68       122        60
OIR    2025130    131400   -8.0000 -137.5800      23.0        68       121        60
OIR    2025130    131400   -8.0000 -137.5900      22.4        67       121        60
OIR    2025130    131400   -8.0000 -137.6000      21.9        67       121        60
OIR    2025130    131400   -8.0000 -137.6100      21.2        67       120        60
OIR    2025130    131400   -8.0000 -137.6200      20.4        66       120        60
OIR    2025130    131400   -8.0000 -137.6300      19.6        66       120        60
OIR    2025130    131400   -8.0000 -137.6400      18.7        65       121        60
OIR    2025130    131400   -8.0000 -137.6500      17.7        65       122        60
OIR    2025130    131400   -8.0000 -137.6600      16.9        65       121        60
OIR    2025130    131400   -8.0000 -137.6700      15.8        65       119        60
OIR    2025130    131400   -8.0000 -137.6800      15.0        64       119        60
OIR    2025130    131400   -8.0000 -137.6900      13.9        64       120        60
OIR    2025130    131400   -8.0000 -137.7000      12.3        64       121        60
OIR    2025130    131400   -8.0000 -137.7100      11.1        64       122        60
OIR    2025130    131400   -8.0000 -137.7200      10.0        63       122        60
OIR    2025130    131400   -8.0000 -137.7300       9.1        61       122        60
OIR    2025130    131400   -8.0000 -137.7400       8.2        58       120        60
OIR    2025130    131400   -8.0000 -137.7500       7.5        54       120        60
OIR    2025130    131400   -8.0000 -137.7600       6.4        41       121        60
OIR    2025130    131400   -8.0000 -137.7700       6.0         7       120        60
OIR    2025130    131400   -8.0000 -137.7800       6.7       349       117        60
OIR    2025130    131400   -8.0000 -137.7900       7.3       341       115        60
OIR    2025130    131400   -8.0000 -137.8000       7.7       335       113        60
OIR    2025130    131400   -8.0000 -137.8100       8.0       332       113        60
OIR    2025130    131400   -8.0000 -137.8200       8.3       330       112        60
OIR    2025130    131400   -8.0000 -137.8300       8.4       328       110        60
OIR    2025130    131400   -8.0000 -137.8400       8.5       326       109        60
OIR    2025130    131400   -8.0000 -137.8500       8.6       325       109        60
OIR    2025130    131400   -8.0000 -137.8600       8.8       325       109        60
OIR    2025130    131400   -8.0000 -137.8700       8.8       325       109        60
OIR    2025130    131400   -8.0000 -137.8800       8.8       324       114        60
OIR    2025130    131400   -8.0000 -137.8900       8.7       323       119        60
OIR    2025130    131400   -8.0000 -137.9000       8.4       322       120        60
OIR    2025130    131400   -8.0000 -137.9100       7.2       316       121        60
OIR    2025130    131400   -8.0000 -137.9200       5.7       304       122        60
OIR    2025130    131400   -8.0000 -137.9300       5.1       283       124        60
OIR    2025130    131400   -8.0000 -137.9400       5.1       260       126        60
OIR    2025130    131400   -8.0000 -137.9500       6.1       239       127        60
OIR    2025130    131400   -8.0000 -137.9600       7.3       230       126        60
OIR    2025130    131400   -8.0000 -137.9700       8.0       227       127        60
OIR    2025130    131400   -8.0000 -137.9800       8.4       220       130        60
OIR    2025130    131400   -8.0000 -137.9900      10.4       202       136        60
OIR    2025130    131400   -8.0000 -138.0000      16.3       179       144        60
OIR    2025130    131400   -8.0100 -137.5200      25.2        68       140        60
OIR    2025130    131400   -8.0100 -137.5300      25.6        68       132        60
OIR    2025130    131400   -8.0100 -137.5400      25.8        68       128        60
OIR    2025130    131400   -8.0100 -137.5500      25.7        68       125        60
OIR    2025130    131400   -8.0100 -137.5600      25.2        68       123        60
OIR    2025130    131400   -8.0100 -137.5700      24.4        67       121        60
OIR    2025130    131400   -8.0100 -137.5800      23.5        67       120        60
OIR    2025130    131400   -8.0100 -137.5900      22.8        66       121        60
OIR    2025130    131400   -8.0100 -137.6000      22.3        66       120        60
OIR    2025130    131400   -8.0100 -137.6100      21.6        65       119        60
OIR    2025130    131400   -8.0100 -137.6200      20.8        65       116        60
OIR    2025130    131400   -8.0100 -137.6300      20.1        64       117        60
OIR    2025130    131400   -8.0100 -137.6400      19.3        64       120        60
OIR    2025130    131400   -8.0100 -137.6500      18.4        63       121        60
OIR    2025130    131400   -8.0100 -137.6600      17.5        63       121        60
OIR    2025130    131400   -8.0100 -137.6700      16.5        62       119        60
OIR    2025130    131400   -8.0100 -137.6800      15.4        62       119        60
OIR    2025130    131400   -8.0100 -137.6900      14.2        61       119        60
OIR    2025130    131400   -8.0100 -137.7000      12.9        60       120        60
OIR    2025130    131400   -8.0100 -137.7100      11.7        60       121        60
OIR    2025130    131400   -8.0100 -137.7200      10.4        59       121        60
OIR    2025130    131400   -8.0100 -137.7300       9.2        57       121        60
OIR    2025130    131400   -8.0100 -137.7400       8.2        53       122        60
OIR    2025130    131400   -8.0100 -137.7500       7.2        46       122        60
OIR    2025130    131400   -8.0100 -137.7600       6.2        20       123        60
OIR    2025130    131400   -8.0100 -137.7700       6.8       354       121        60
OIR    2025130    131400   -8.0100 -137.7800       7.6       343       117        60
OIR    2025130    131400   -8.0100 -137.7900       8.1       337       114        60
OIR    2025130    131400   -8.0100 -137.8000       8.4       332       108        60
OIR    2025130    131400   -8.0100 -137.8100       8.7       330       107        60
OIR    2025130    131400   -8.0100 -137.8200       8.8       328       107        60
OIR    2025130    131400   -8.0100 -137.8300       8.9       327       105        60
OIR    2025130    131400   -8.0100 -137.8400       8.9       326       108        60
OIR    2025130    131400   -8.0100 -137.8500       8.9       325       111        60
OIR    2025130    131400   -8.0100 -137.8600       9.0       325       111        60
OIR    2025130    131400   -8.0100 -137.8700       8.9       325       110        60
OIR    2025130    131400   -8.0100 -137.8800       8.9       324       115        60
OIR    2025130    131400   -8.0100 -137.8900       8.9       324       120        60
OIR    2025130    131400   -8.0100 -137.9000       8.8       323       121        60
OIR    2025130    131400   -8.0100 -137.9100       8.3       321       123        60
OIR    2025130    131400   -8.0100 -137.9200       7.7       318       124        60
OIR    2025130    131400   -8.0100 -137.9300       7.1       312       126        60
OIR    2025130    131400   -8.0100 -137.9400       6.6       306       128        60
OIR    2025130    131400   -8.0100 -137.9500       6.2       298       126        60
OIR    2025130    131400   -8.0100 -137.9600       6.1       281       122        60
OIR    2025130    131400   -8.0100 -137.9700       6.2       261       122        60
OIR    2025130    131400   -8.0100 -137.9800       6.1       246       125        60
OIR    2025130    131400   -8.0100 -137.9900       5.2       239       129        60
OIR    2025130    131400   -8.0100 -138.0000       6.7       261       133        60
OIR    2025130    131400   -8.0100 -138.0100       4.6       259       143        60
OIR    2025130    131400   -8.0200 -137.5200      25.3        67       144        60
OIR    2025130    131400   -8.0200 -137.5300      25.6        67       136        60
OIR    2025130    131400   -8.0200 -137.5400      25.9        67       131        60
OIR    2025130    131400   -8.0200 -137.5500      26.0        67       126        60
OIR    2025130    131400   -8.0200 -137.5600      25.8        67       122        60
OIR    2025130    131400   -8.0200 -137.5700      25.3        67       120        60
OIR    2025130    131400   -8.0200 -137.5800      24.3        66       119        60
OIR    2025130    131400   -8.0200 -137.5900      23.0        66       121        60
OIR    2025130    131400   -8.0200 -137.6000      22.6        65       122        60
OIR    2025130    131400   -8.0200 -137.6100      21.9        64       120        60
OIR    2025130    131400   -8.0200 -137.6200      21.1        63       117        60
OIR    2025130    131400   -8.0200 -137.6300      20.4        63       119        60
OIR    2025130    131400   -8.0200 -137.6400      19.8        62       120        60
OIR    2025130    131400   -8.0200 -137.6500      19.0        62       121        60
OIR    2025130    131400   -8.0200 -137.6600      18.2        61       120        60
OIR    2025130    131400   -8.0200 -137.6700      17.3        61       119        60
OIR    2025130    131400   -8.0200 -137.6800      16.1        60       119        60
OIR    2025130    131400   -8.0200 -137.6900      14.5        59       119        60
OIR    2025130    131400   -8.0200 -137.7000      13.1        58       119        60
OIR    2025130    131400   -8.0200 -137.7100      12.1        57       120        60
OIR    2025130    131400   -8.0200 -137.7200      10.9        55       120        60
OIR    2025130    131400   -8.0200 -137.7300       9.5        51       120        60
OIR    2025130    131400   -8.0200 -137.7400       8.3        44       121        60
OIR    2025130    131400   -8.0200 -137.7500       7.3        30       120        60
OIR    2025130    131400   -8.0200 -137.7600       7.0         4       119        60
OIR    2025130    131400   -8.0200 -137.7700       7.7       347       116        60
OIR    2025130    131400   -8.0200 -137.7800       8.4       338       113        60
OIR    2025130    131400   -8.0200 -137.7900       8.7       335       110        60
OIR    2025130    131400   -8.0200 -137.8000       9.0       331       108        60
OIR    2025130    131400   -8.0200 -137.8100       9.1       329       107        60
OIR    2025130    131400   -8.0200 -137.8200       9.1       328       105        60
OIR    2025130    131400   -8.0200 -137.8300       9.1       327       107        60
OIR    2025130    131400   -8.0200 -137.8400       9.1       326       109        60
OIR    2025130    131400   -8.0200 -137.8500       9.1       326       111        60
OIR    2025130    131400   -8.0200 -137.8600       9.1       325       113        60
OIR    2025130    131400   -8.0200 -137.8700       9.0       325       114        60
OIR    2025130    131400   -8.0200 -137.8800       8.9       324       116        60
OIR    2025130    131400   -8.0200 -137.8900       8.9       324       117        60
OIR    2025130    131400   -8.0200 -137.9000       8.8       323       119        60
OIR    2025130    131400   -8.0200 -137.9100       8.6       322       120        60
OIR    2025130    131400   -8.0200 -137.9200       8.2       320       121        60
OIR    2025130    131400   -8.0200 -137.9300       7.9       317       123        60
OIR    2025130    131400   -8.0200 -137.9400       7.7       315       125        60
OIR    2025130    131400   -8.0200 -137.9500       7.5       313       124        60
OIR    2025130    131400   -8.0200 -137.9600       7.4       310       123        60
OIR    2025130    131400   -8.0200 -137.9700       7.2       307       123        60
OIR    2025130    131400   -8.0200 -137.9800       7.2       306       125        60
OIR    2025130    131400   -8.0200 -137.9900       7.6       309       125        60
OIR    2025130    131400   -8.0200 -138.0000       8.4       318       127        60
OIR    2025130    131400   -8.0200 -138.0100       8.7       314       137        60
OIR    2025130    131400   -8.0200 -138.0200       6.1       322       147        60
OIR    2025130    131400   -8.0300 -137.5300      26.0        67       141        60
OIR    2025130    131400   -8.0300 -137.5400      26.2        67       133        60
OIR    2025130    131400   -8.0300 -137.5500      26.2        67       127        60
OIR    2025130    131400   -8.0300 -137.5600      26.1        67       121        60
OIR    2025130    131400   -8.0300 -137.5700      25.8        67       119        60
OIR    2025130    131400   -8.0300 -137.5800      25.0        66       117        60
OIR    2025130    131400   -8.0300 -137.5900      23.3        65       121        60
OIR    2025130    131400   -8.0300 -137.6000      22.8        64       123        60
OIR    2025130    131400   -8.0300 -137.6100      22.1        63       121        60
OIR    2025130    131400   -8.0300 -137.6200      21.2        62       119        60
OIR    2025130    131400   -8.0300 -137.6300      20.6        62       121        60
OIR    2025130    131400   -8.0300 -137.6400      20.1        61       121        60
OIR    2025130    131400   -8.0300 -137.6500      19.5        61       120        60
OIR    2025130    131400   -8.0300 -137.6600      18.8        60       120        60
OIR    2025130    131400   -8.0300 -137.6700      17.9        60       119        60
OIR    2025130    131400   -8.0300 -137.6800      16.8        59       119        60
OIR    2025130    131400   -8.0300 -137.6900      15.0        58       120        60
OIR    2025130    131400   -8.0300 -137.7000      13.4        56       117        60
OIR    2025130    131400   -8.0300 -137.7100      12.3        54       117        60
OIR    2025130    131400   -8.0300 -137.7200      11.2        52       117        60
OIR    2025130    131400   -8.0300 -137.7300       9.6        46       119        60
OIR    2025130    131400   -8.0300 -137.7400       8.1        37       120        60
OIR    2025130    131400   -8.0300 -137.7500       7.0        18       117        60
OIR    2025130    131400   -8.0300 -137.7600       7.4       354       115        60
OIR    2025130    131400   -8.0300 -137.7700       8.3       341       112        60
OIR    2025130    131400   -8.0300 -137.7800       8.8       337       109        60
OIR    2025130    131400   -8.0300 -137.7900       9.0       334       108        60
OIR    2025130    131400   -8.0300 -137.8000       9.2       330       108        60
OIR    2025130    131400   -8.0300 -137.8100       9.3       329       105        60
OIR    2025130    131400   -8.0300 -137.8200       9.2       328       105        60
OIR    2025130    131400   -8.0300 -137.8300       9.2       327       108        60
OIR    2025130    131400   -8.0300 -137.8400       9.2       326       110        60
OIR    2025130    131400   -8.0300 -137.8500       9.3       326       112        60
OIR    2025130    131400   -8.0300 -137.8600       9.3       325       114        60
OIR    2025130    131400   -8.0300 -137.8700       9.2       325       115        60
OIR    2025130    131400   -8.0300 -137.8800       8.8       323       115        60
OIR    2025130    131400   -8.0300 -137.8900       8.7       323       115        60
OIR    2025130    131400   -8.0300 -137.9000       8.6       322       116        60
OIR    2025130    131400   -8.0300 -137.9100       8.5       321       116        60
OIR    2025130    131400   -8.0300 -137.9200       8.2       318       117        60
OIR    2025130    131400   -8.0300 -137.9300       7.9       316       119        60
OIR    2025130    131400   -8.0300 -137.9400       7.8       315       121        60
OIR    2025130    131400   -8.0300 -137.9500       7.6       313       122        60
OIR    2025130    131400   -8.0300 -137.9600       7.5       311       122        60
OIR    2025130    131400   -8.0300 -137.9700       7.5       309       123        60
OIR    2025130    131400   -8.0300 -137.9800       7.7       312       124        60
OIR    2025130    131400   -8.0300 -137.9900       8.3       316       122        60
OIR    2025130    131400   -8.0300 -138.0000       8.5       319       121        60
OIR    2025130    131400   -8.0300 -138.0100       9.1       313       132        60
OIR    2025130    131400   -8.0300 -138.0200       5.3       302       143        60
OIR    2025130    131400   -8.0400 -137.5400      26.3        67       135        60
OIR    2025130    131400   -8.0400 -137.5500      26.3        67       128        60
OIR    2025130    131400   -8.0400 -137.5600      26.2        67       122        60
OIR    2025130    131400   -8.0400 -137.5700      26.1        67       117        60
OIR    2025130    131400   -8.0400 -137.5800      25.5        66       116        60
OIR    2025130    131400   -8.0400 -137.5900      23.7        65       119        60
OIR    2025130    131400   -8.0400 -137.6000      22.8        64       120        60
OIR    2025130    131400   -8.0400 -137.6100      22.1        63       119        60
OIR    2025130    131400   -8.0400 -137.6200      21.4        61       117        60
OIR    2025130    131400   -8.0400 -137.6300      20.7        61       119        60
OIR    2025130    131400   -8.0400 -137.6400      20.2        60       120        60
OIR    2025130    131400   -8.0400 -137.6500      19.8        60       120        60
OIR    2025130    131400   -8.0400 -137.6600      19.3        59       117        60
OIR    2025130    131400   -8.0400 -137.6700      18.5        59       116        60
OIR    2025130    131400   -8.0400 -137.6800      17.3        58       116        60
OIR    2025130    131400   -8.0400 -137.6900      15.7        56       119        60
OIR    2025130    131400   -8.0400 -137.7000      13.9        54       117        60
OIR    2025130    131400   -8.0400 -137.7100      12.5        52       117        60
OIR    2025130    131400   -8.0400 -137.7200      11.3        49       117        60
OIR    2025130    131400   -8.0400 -137.7300       9.5        43       117        60
OIR    2025130    131400   -8.0400 -137.7400       7.9        32       116        60
OIR    2025130    131400   -8.0400 -137.7500       6.9         8       116        60
OIR    2025130    131400   -8.0400 -137.7600       7.8       347       113        60
OIR    2025130    131400   -8.0400 -137.7700       8.7       339       111        60
OIR    2025130    131400   -8.0400 -137.7800       9.0       336       110        60
OIR    2025130    131400   -8.0400 -137.7900       9.3       334       109        60
OIR    2025130    131400   -8.0400 -137.8000       9.4       330       109        60
OIR    2025130    131400   -8.0400 -137.8100       9.4       328       107        60
OIR    2025130    131400   -8.0400 -137.8200       9.4       328       105        60
OIR    2025130    131400   -8.0400 -137.8300       9.3       327       110        60
OIR    2025130    131400   -8.0400 -137.8400       9.3       326       111        60
OIR    2025130    131400   -8.0400 -137.8500       9.3       326       111        60
OIR    2025130    131400   -8.0400 -137.8600       9.3       325       110        60
OIR    2025130    131400   -8.0400 -137.8700       9.2       325       109        60
OIR    2025130    131400   -8.0400 -137.8800       8.9       323       108        60
OIR    2025130    131400   -8.0400 -137.8900       8.7       322       108        60
OIR    2025130    131400   -8.0400 -137.9000       8.7       321       109        60
OIR    2025130    131400   -8.0400 -137.9100       8.7       321       109        60
OIR    2025130    131400   -8.0400 -137.9200       8.5       319       110        60
OIR    2025130    131400   -8.0400 -137.9300       8.1       317       111        60
OIR    2025130    131400   -8.0400 -137.9400       7.9       315       113        60
OIR    2025130    131400   -8.0400 -137.9500       7.8       314       116        60
OIR    2025130    131400   -8.0400 -137.9600       7.7       312       117        60
OIR    2025130    131400   -8.0400 -137.9700       8.0       314       120        60
OIR    2025130    131400   -8.0400 -137.9800       8.3       317       121        60
OIR    2025130    131400   -8.0400 -137.9900       8.5       317       120        60
OIR    2025130    131400   -8.0400 -138.0000       9.0       317       121        60
OIR    2025130    131400   -8.0400 -138.0100      17.3       314       132        60
OIR    2025130    131400   -8.0400 -138.0200      20.9       323       144        60
OIR    2025130    131400   -8.0500 -137.5400      26.3        67       136        60
OIR    2025130    131400   -8.0500 -137.5500      26.3        67       128        60
OIR    2025130    131400   -8.0500 -137.5600      26.3        67       122        60
OIR    2025130    131400   -8.0500 -137.5700      26.2        67       117        60
OIR    2025130    131400   -8.0500 -137.5800      25.8        66       115        60
OIR    2025130    131400   -8.0500 -137.5900      24.1        65       116        60
OIR    2025130    131400   -8.0500 -137.6000      22.9        63       117        60
OIR    2025130    131400   -8.0500 -137.6100      22.0        62       116        60
OIR    2025130    131400   -8.0500 -137.6200      21.4        60       116        60
OIR    2025130    131400   -8.0500 -137.6300      20.8        59       116        60
OIR    2025130    131400   -8.0500 -137.6400      20.4        59       117        60
OIR    2025130    131400   -8.0500 -137.6500      20.1        58       119        60
OIR    2025130    131400   -8.0500 -137.6600      19.8        58       116        60
OIR    2025130    131400   -8.0500 -137.6700      19.2        57       116        60
OIR    2025130    131400   -8.0500 -137.6800      18.0        56       116        60
OIR    2025130    131400   -8.0500 -137.6900      16.5        54       119        60
OIR    2025130    131400   -8.0500 -137.7000      15.0        51       119        60
OIR    2025130    131400   -8.0500 -137.7100      13.4        48       119        60
OIR    2025130    131400   -8.0500 -137.7200      11.9        44       117        60
OIR    2025130    131400   -8.0500 -137.7300       9.7        37       117        60
OIR    2025130    131400   -8.0500 -137.7400       8.1        23       116        60
OIR    2025130    131400   -8.0500 -137.7500       7.4         0       115        60
OIR    2025130    131400   -8.0500 -137.7600       8.4       345       113        60
OIR    2025130    131400   -8.0500 -137.7700       9.0       339       112        60
OIR    2025130    131400   -8.0500 -137.7800       9.3       336       111        60
OIR    2025130    131400   -8.0500 -137.7900       9.4       334       111        60
OIR    2025130    131400   -8.0500 -137.8000       9.5       331       110        60
OIR    2025130    131400   -8.0500 -137.8100       9.4       329       108        60
OIR    2025130    131400   -8.0500 -137.8200       9.4       327       107        60
OIR    2025130    131400   -8.0500 -137.8300       9.4       327       110        60
OIR    2025130    131400   -8.0500 -137.8400       9.4       326       110        60
OIR    2025130    131400   -8.0500 -137.8500       9.4       326       109        60
OIR    2025130    131400   -8.0500 -137.8600       9.4       325       107        60
OIR    2025130    131400   -8.0500 -137.8700       9.4       325       104        60
OIR    2025130    131400   -8.0500 -137.8800       9.4       324       103        60
OIR    2025130    131400   -8.0500 -137.8900       9.2       323       103        60
OIR    2025130    131400   -8.0500 -137.9000       9.1       322       103        60
OIR    2025130    131400   -8.0500 -137.9100       9.1       321       103        60
OIR    2025130    131400   -8.0500 -137.9200       9.0       320       104        60
OIR    2025130    131400   -8.0500 -137.9300       8.8       319       104        60
OIR    2025130    131400   -8.0500 -137.9400       8.6       318       107        60
OIR    2025130    131400   -8.0500 -137.9500       8.6       319       110        60
OIR    2025130    131400   -8.0500 -137.9600       8.5       317       114        60
OIR    2025130    131400   -8.0500 -137.9700       8.7       318       116        60
OIR    2025130    131400   -8.0500 -137.9800       8.8       320       117        60
OIR    2025130    131400   -8.0500 -137.9900       9.0       320       117        60
OIR    2025130    131400   -8.0500 -138.0000      13.8       310       120        60
OIR    2025130    131400   -8.0500 -138.0100      19.2       310       131        60
OIR    2025130    131400   -8.0500 -138.0200      19.5       309       142        60
OIR    2025130    131400   -8.0600 -137.5400      26.3        67       135        60
OIR    2025130    131400   -8.0600 -137.5500      26.3        67       128        60
OIR    2025130    131400   -8.0600 -137.5600      26.3        67       123        60
OIR    2025130    131400   -8.0600 -137.5700      26.3        67       117        60
OIR    2025130    131400   -8.0600 -137.5800      26.1        67       114        60
OIR    2025130    131400   -8.0600 -137.5900      24.5        65       115        60
OIR    2025130    131400   -8.0600 -137.6000      22.8        62       115        60
OIR    2025130    131400   -8.0600 -137.6100      21.8        61       116        60
OIR    2025130    131400   -8.0600 -137.6200      21.2        59       116        60
OIR    2025130    131400   -8.0600 -137.6300      20.8        58       116        60
OIR    2025130    131400   -8.0600 -137.6400      20.6        58       116        60
OIR    2025130    131400   -8.0600 -137.6500      20.4        57       117        60
OIR    2025130    131400   -8.0600 -137.6600      20.2        57       116        60
OIR    2025130    131400   -8.0600 -137.6700      19.8        56       116        60
OIR    2025130    131400   -8.0600 -137.6800      19.1        55       116        60
OIR    2025130    131400   -8.0600 -137.6900      17.6        54       119        60
OIR    2025130    131400   -8.0600 -137.7000      15.7        50       120        60
OIR    2025130    131400   -8.0600 -137.7100      14.0        45       120        60
OIR    2025130    131400   -8.0600 -137.7200      12.1        40       121        60
OIR    2025130    131400   -8.0600 -137.7300       9.9        28       121        60
OIR    2025130    131400   -8.0600 -137.7400       8.7        13       120        60
OIR    2025130    131400   -8.0600 -137.7500       8.6       356       117        60
OIR    2025130    131400   -8.0600 -137.7600       9.0       345       116        60
OIR    2025130    131400   -8.0600 -137.7700       9.3       340       116        60
OIR    2025130    131400   -8.0600 -137.7800       9.5       337       115        60
OIR    2025130    131400   -8.0600 -137.7900       9.5       334       114        60
OIR    2025130    131400   -8.0600 -137.8000       9.5       332       114        60
OIR    2025130    131400   -8.0600 -137.8100       9.5       329       109        60
OIR    2025130    131400   -8.0600 -137.8200       9.8       327       105        60
OIR    2025130    131400   -8.0600 -137.8300       9.9       327       105        60
OIR    2025130    131400   -8.0600 -137.8400       9.9       326       105        60
OIR    2025130    131400   -8.0600 -137.8500       9.7       326       104        60
OIR    2025130    131400   -8.0600 -137.8600       9.5       325       104        60
OIR    2025130    131400   -8.0600 -137.8700       9.5       325       103        60
OIR    2025130    131400   -8.0600 -137.8800       9.6       325       103        60
OIR    2025130    131400   -8.0600 -137.8900      10.3       326       103        60
OIR    2025130    131400   -8.0600 -137.9000      10.9       325       103        60
OIR    2025130    131400   -8.0600 -137.9100      11.0       324       103        60
OIR    2025130    131400   -8.0600 -137.9200      11.1       324       103        60
OIR    2025130    131400   -8.0600 -137.9300      11.0       324       104        60
OIR    2025130    131400   -8.0600 -137.9400      11.2       324       104        60
OIR    2025130    131400   -8.0600 -137.9500      11.1       323       105        60
OIR    2025130    131400   -8.0600 -137.9600      11.1       323       108        60
OIR    2025130    131400   -8.0600 -137.9700      10.8       323       110        60
OIR    2025130    131400   -8.0600 -137.9800      10.8       325       112        60
OIR    2025130    131400   -8.0600 -137.9900      10.8       325       115        60
OIR    2025130    131400   -8.0600 -138.0000      18.3       310       116        60
OIR    2025130    131400   -8.0600 -138.0100      19.1       309       123        60
OIR    2025130    131400   -8.0600 -138.0200      17.6       308       128        60
OIR    2025130    131400   -8.0600 -138.0300      21.9       289       146        60
OIR    2025130    131400   -8.0700 -137.5400      26.2        67       134        60
OIR    2025130    131400   -8.0700 -137.5500      26.3        67       128        60
OIR    2025130    131400   -8.0700 -137.5600      26.3        67       124        60
OIR    2025130    131400   -8.0700 -137.5700      26.3        67       119        60
OIR    2025130    131400   -8.0700 -137.5800      26.2        67       115        60
OIR    2025130    131400   -8.0700 -137.5900      25.1        65       114        60
OIR    2025130    131400   -8.0700 -137.6000      22.8        62       114        60
OIR    2025130    131400   -8.0700 -137.6100      21.6        59       115        60
OIR    2025130    131400   -8.0700 -137.6200      21.0        58       116        60
OIR    2025130    131400   -8.0700 -137.6300      20.8        57       116        60
OIR    2025130    131400   -8.0700 -137.6400      20.6        57       116        60
OIR    2025130    131400   -8.0700 -137.6500      20.5        57       116        60
OIR    2025130    131400   -8.0700 -137.6600      20.4        56       116        60
OIR    2025130    131400   -8.0700 -137.6700      20.2        56       116        60
OIR    2025130    131400   -8.0700 -137.6800      19.9        55       117        60
OIR    2025130    131400   -8.0700 -137.6900      19.2        53       119        60
OIR    2025130    131400   -8.0700 -137.7000      17.4        50       120        60
OIR    2025130    131400   -8.0700 -137.7100      14.9        45       122        60
OIR    2025130    131400   -8.0700 -137.7200      12.2        38       123        60
OIR    2025130    131400   -8.0700 -137.7300       9.5        20       123        60
OIR    2025130    131400   -8.0700 -137.7400       8.9         4       122        60
OIR    2025130    131400   -8.0700 -137.7500       9.1       353       121        60
OIR    2025130    131400   -8.0700 -137.7600       9.5       346       120        60
OIR    2025130    131400   -8.0700 -137.7700       9.6       341       117        60
OIR    2025130    131400   -8.0700 -137.7800       9.6       337       116        60
OIR    2025130    131400   -8.0700 -137.7900       9.6       335       115        60
OIR    2025130    131400   -8.0700 -137.8000       9.8       333       115        60
OIR    2025130    131400   -8.0700 -137.8100      10.4       331       110        60
OIR    2025130    131400   -8.0700 -137.8200      10.7       328       105        60
OIR    2025130    131400   -8.0700 -137.8300      10.5       327       104        60
OIR    2025130    131400   -8.0700 -137.8400      10.3       327       103        60
OIR    2025130    131400   -8.0700 -137.8500      10.1       327       103        60
OIR    2025130    131400   -8.0700 -137.8600       9.9       326       103        60
OIR    2025130    131400   -8.0700 -137.8700       9.8       326       103        60
OIR    2025130    131400   -8.0700 -137.8800      10.0       326       103        60
OIR    2025130    131400   -8.0700 -137.8900      10.8       325       103        60
OIR    2025130    131400   -8.0700 -137.9000      11.0       325       103        60
OIR    2025130    131400   -8.0700 -137.9100      11.1       324       103        60
OIR    2025130    131400   -8.0700 -137.9200      11.1       324       103        60
OIR    2025130    131400   -8.0700 -137.9300      11.2       324       103        60
OIR    2025130    131400   -8.0700 -137.9400      11.2       324       103        60
OIR    2025130    131400   -8.0700 -137.9500      11.2       324       104        60
OIR    2025130    131400   -8.0700 -137.9600      11.1       324       104        60
OIR    2025130    131400   -8.0700 -137.9700      11.0       324       105        60
OIR    2025130    131400   -8.0700 -137.9800      11.1       326       109        60
OIR    2025130    131400   -8.0700 -137.9900      11.2       327       112        60
OIR    2025130    131400   -8.0700 -138.0000      16.6       313       114        60
OIR    2025130    131400   -8.0700 -138.0100      18.6       310       116        60
OIR    2025130    131400   -8.0700 -138.0200      15.7       324       120        60
OIR    2025130    131400   -8.0700 -138.0300      24.5       292       142        60
OIR    2025130    131400   -8.0800 -137.5400      26.2        67       133        60
OIR    2025130    131400   -8.0800 -137.5500      26.2        67       128        60
OIR    2025130    131400   -8.0800 -137.5600      26.2        67       125        60
OIR    2025130    131400   -8.0800 -137.5700      26.2        67       122        60
OIR    2025130    131400   -8.0800 -137.5800      26.1        66       119        60
OIR    2025130    131400   -8.0800 -137.5900      25.3        65       116        60
OIR    2025130    131400   -8.0800 -137.6000      22.6        61       116        60
OIR    2025130    131400   -8.0800 -137.6100      21.4        58       116        60
OIR    2025130    131400   -8.0800 -137.6200      21.0        57       116        60
OIR    2025130    131400   -8.0800 -137.6300      20.8        57       116        60
OIR    2025130    131400   -8.0800 -137.6400      20.7        57       116        60
OIR    2025130    131400   -8.0800 -137.6500      20.6        56       116        60
OIR    2025130    131400   -8.0800 -137.6600      20.5        56       116        60
OIR    2025130    131400   -8.0800 -137.6700      20.4        56       116        60
OIR    2025130    131400   -8.0800 -137.6800      20.3        55       116        60
OIR    2025130    131400   -8.0800 -137.6900      19.8        54       116        60
OIR    2025130    131400   -8.0800 -137.7000      18.8        51       119        60
OIR    2025130    131400   -8.0800 -137.7100      17.0        46       122        60
OIR    2025130    131400   -8.0800 -137.7200      14.7        35       124        60
OIR    2025130    131400   -8.0800 -137.7300      11.3         6       124        60
OIR    2025130    131400   -8.0800 -137.7400      11.5       355       122        60
OIR    2025130    131400   -8.0800 -137.7500      11.7       351       120        60
OIR    2025130    131400   -8.0800 -137.7600      11.7       348       119        60
OIR    2025130    131400   -8.0800 -137.7700      11.7       345       116        60
OIR    2025130    131400   -8.0800 -137.7800      11.6       342       113        60
OIR    2025130    131400   -8.0800 -137.7900      11.4       340       112        60
OIR    2025130    131400   -8.0800 -137.8000      11.1       337       111        60
OIR    2025130    131400   -8.0800 -137.8100      11.1       330       107        60
OIR    2025130    131400   -8.0800 -137.8200      11.0       330       104        60
OIR    2025130    131400   -8.0800 -137.8300      10.8       328       103        60
OIR    2025130    131400   -8.0800 -137.8400      10.7       328       103        60
OIR    2025130    131400   -8.0800 -137.8500      10.7       328       103        60
OIR    2025130    131400   -8.0800 -137.8600      10.5       327       103        60
OIR    2025130    131400   -8.0800 -137.8700      10.4       327       103        60
OIR    2025130    131400   -8.0800 -137.8800      10.7       326       103        60
OIR    2025130    131400   -8.0800 -137.8900      11.0       325       103        60
OIR    2025130    131400   -8.0800 -137.9000      11.0       325       103        60
OIR    2025130    131400   -8.0800 -137.9100      11.1       324       103        60
OIR    2025130    131400   -8.0800 -137.9200      11.2       324       103        60
OIR    2025130    131400   -8.0800 -137.9300      11.2       324       103        60
OIR    2025130    131400   -8.0800 -137.9400      11.2       324       103        60
OIR    2025130    131400   -8.0800 -137.9500      11.2       324       103        60
OIR    2025130    131400   -8.0800 -137.9600      11.1       324       103        60
OIR    2025130    131400   -8.0800 -137.9700      11.1       325       104        60
OIR    2025130    131400   -8.0800 -137.9800      11.1       328       105        60
OIR    2025130    131400   -8.0800 -137.9900      11.3       332       109        60
OIR    2025130    131400   -8.0800 -138.0000      13.5       323       111        60
OIR    2025130    131400   -8.0800 -138.0100      15.1       318       114        60
OIR    2025130    131400   -8.0800 -138.0200      13.8       329       116        60
OIR    2025130    131400   -8.0800 -138.0300      21.8       296       142        60
OIR    2025130    131400   -8.0900 -137.5300      25.3        69       142        60
OIR    2025130    131400   -8.0900 -137.5400      26.1        67       134        60
OIR    2025130    131400   -8.0900 -137.5500      26.2        67       130        60
OIR    2025130    131400   -8.0900 -137.5600      26.2        67       128        60
OIR    2025130    131400   -8.0900 -137.5700      26.2        67       125        60
OIR    2025130    131400   -8.0900 -137.5800      26.0        66       121        60
OIR    2025130    131400   -8.0900 -137.5900      25.0        64       119        60
OIR    2025130    131400   -8.0900 -137.6000      22.4        60       117        60
OIR    2025130    131400   -8.0900 -137.6100      21.3        58       117        60
OIR    2025130    131400   -8.0900 -137.6200      21.0        57       117        60
OIR    2025130    131400   -8.0900 -137.6300      20.8        57       116        60
OIR    2025130    131400   -8.0900 -137.6400      20.7        56       115        60
OIR    2025130    131400   -8.0900 -137.6500      20.7        56       114        60
OIR    2025130    131400   -8.0900 -137.6600      20.6        56       115        60
OIR    2025130    131400   -8.0900 -137.6700      20.6        56       116        60
OIR    2025130    131400   -8.0900 -137.6800      20.5        55       115        60
OIR    2025130    131400   -8.0900 -137.6900      20.1        54       114        60
OIR    2025130    131400   -8.0900 -137.7000      19.3        52       116        60
OIR    2025130    131400   -8.0900 -137.7100      18.2        49       120        60
OIR    2025130    131400   -8.0900 -137.7200      15.7        41       123        60
OIR    2025130    131400   -8.0900 -137.7300      11.9       359       123        60
OIR    2025130    131400   -8.0900 -137.7400      11.9       353       121        60
OIR    2025130    131400   -8.0900 -137.7500      11.9       350       119        60
OIR    2025130    131400   -8.0900 -137.7600      12.0       348       116        60
OIR    2025130    131400   -8.0900 -137.7700      11.9       346       114        60
OIR    2025130    131400   -8.0900 -137.7800      11.8       343       111        60
OIR    2025130    131400   -8.0900 -137.7900      11.6       341       109        60
OIR    2025130    131400   -8.0900 -137.8000      11.4       338       107        60
OIR    2025130    131400   -8.0900 -137.8100      11.3       331       104        60
OIR    2025130    131400   -8.0900 -137.8200      11.2       330       103        60
OIR    2025130    131400   -8.0900 -137.8300      11.2       329       103        60
OIR    2025130    131400   -8.0900 -137.8400      11.1       329       103        60
OIR    2025130    131400   -8.0900 -137.8500      11.1       329       103        60
OIR    2025130    131400   -8.0900 -137.8600      11.0       328       103        60
OIR    2025130    131400   -8.0900 -137.8700      11.0       328       103        60
OIR    2025130    131400   -8.0900 -137.8800      11.0       327       103        60
OIR    2025130    131400   -8.0900 -137.8900      11.1       326       103        60
OIR    2025130    131400   -8.0900 -137.9000      11.1       325       103        60
OIR    2025130    131400   -8.0900 -137.9100      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9200      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9300      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9400      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9500      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9600      11.2       324       103        60
OIR    2025130    131400   -8.0900 -137.9700      11.2       327       104        60
OIR    2025130    131400   -8.0900 -137.9800      11.2       330       104        60
OIR    2025130    131400   -8.0900 -137.9900      11.3       338       107        60
OIR    2025130    131400   -8.0900 -138.0000      11.6       346       110        60
OIR    2025130    131400   -8.0900 -138.0100      12.6       331       116        60
OIR    2025130    131400   -8.0900 -138.0200      12.2       334       126        60
OIR    2025130    131400   -8.1000 -137.5200      23.0        71       141        60
OIR    2025130    131400   -8.1000 -137.5300      24.2        70       136        60
OIR    2025130    131400   -8.1000 -137.5400      25.3        68       134        60
OIR    2025130    131400   -8.1000 -137.5500      26.0        67       132        60
OIR    2025130    131400   -8.1000 -137.5600      26.1        67       130        60
OIR    2025130    131400   -8.1000 -137.5700      26.0        66       127        60
OIR    2025130    131400   -8.1000 -137.5800      25.4        65       122        60
OIR    2025130    131400   -8.1000 -137.5900      24.2        63       121        60
OIR    2025130    131400   -8.1000 -137.6000      22.0        59       120        60
OIR    2025130    131400   -8.1000 -137.6100      21.2        57       119        60
OIR    2025130    131400   -8.1000 -137.6200      21.1        57       117        60
OIR    2025130    131400   -8.1000 -137.6300      20.8        56       115        60
OIR    2025130    131400   -8.1000 -137.6400      20.8        56       113        60
OIR    2025130    131400   -8.1000 -137.6500      20.7        56       112        60
OIR    2025130    131400   -8.1000 -137.6600      20.7        56       113        60
OIR    2025130    131400   -8.1000 -137.6700      20.7        56       115        60
OIR    2025130    131400   -8.1000 -137.6800      20.6        55       114        60
OIR    2025130    131400   -8.1000 -137.6900      20.4        55       114        60
OIR    2025130    131400   -8.1000 -137.7000      19.8        53       115        60
OIR    2025130    131400   -8.1000 -137.7100      18.7        50       116        60
OIR    2025130    131400   -8.1000 -137.7200      16.0        43       121        60
OIR    2025130    131400   -8.1000 -137.7300      11.7         2       121        60
OIR    2025130    131400   -8.1000 -137.7400      12.0       354       119        60
OIR    2025130    131400   -8.1000 -137.7500      12.1       351       116        60
OIR    2025130    131400   -8.1000 -137.7600      12.1       349       113        60
OIR    2025130    131400   -8.1000 -137.7700      12.0       347       111        60
OIR    2025130    131400   -8.1000 -137.7800      11.9       344       109        60
OIR    2025130    131400   -8.1000 -137.7900      11.7       342       105        60
OIR    2025130    131400   -8.1000 -137.8000      11.6       339       104        60
OIR    2025130    131400   -8.1000 -137.8100      11.3       331       103        60
OIR    2025130    131400   -8.1000 -137.8200      11.3       331       103        60
OIR    2025130    131400   -8.1000 -137.8300      11.3       330       103        60
OIR    2025130    131400   -8.1000 -137.8400      11.2       329       103        60
OIR    2025130    131400   -8.1000 -137.8500      11.1       329       103        60
OIR    2025130    131400   -8.1000 -137.8600      11.1       329       103        60
OIR    2025130    131400   -8.1000 -137.8700      11.1       328       103        60
OIR    2025130    131400   -8.1000 -137.8800      11.2       327       103        60
OIR    2025130    131400   -8.1000 -137.8900      11.2       326       103        60
OIR    2025130    131400   -8.1000 -137.9000      11.2       325       103        60
OIR    2025130    131400   -8.1000 -137.9100      11.3       324       103        60
OIR    2025130    131400   -8.1000 -137.9200      11.3       324       103        60
OIR    2025130    131400   -8.1000 -137.9300      11.3       323       103        60
OIR    2025130    131400   -8.1000 -137.9400      11.3       323       103        60
OIR    2025130    131400   -8.1000 -137.9500      11.4       324       103        60
OIR    2025130    131400   -8.1000 -137.9600      11.5       325       103        60
OIR    2025130    131400   -8.1000 -137.9700      11.6       328       104        60
OIR    2025130    131400   -8.1000 -137.9800      11.6       332       104        60
OIR    2025130    131400   -8.1000 -137.9900      11.6       345       105        60
OIR    2025130    131400   -8.1000 -138.0000      12.7         4       111        60
OIR    2025130    131400   -8.1000 -138.0100      12.2       349       125        60
OIR    2025130    131400   -8.1000 -138.0200      12.0       341       140        60
OIR    2025130    131400   -8.1100 -137.2000      10.2       130       134        60
OIR    2025130    131400   -8.1100 -137.5200      22.3        72       139        60
OIR    2025130    131400   -8.1100 -137.5300      23.6        70       134        60
OIR    2025130    131400   -8.1100 -137.5400      24.3        68       134        60
OIR    2025130    131400   -8.1100 -137.5500      25.0        67       133        60
OIR    2025130    131400   -8.1100 -137.5600      25.4        66       131        60
OIR    2025130    131400   -8.1100 -137.5700      25.3        65       128        60
OIR    2025130    131400   -8.1100 -137.5800      24.3        64       125        60
OIR    2025130    131400   -8.1100 -137.5900      23.1        62       123        60
OIR    2025130    131400   -8.1100 -137.6000      21.7        59       122        60
OIR    2025130    131400   -8.1100 -137.6100      21.2        57       120        60
OIR    2025130    131400   -8.1100 -137.6200      21.1        57       119        60
OIR    2025130    131400   -8.1100 -137.6300      20.8        56       116        60
OIR    2025130    131400   -8.1100 -137.6400      20.8        56       114        60
OIR    2025130    131400   -8.1100 -137.6500      20.8        56       113        60
OIR    2025130    131400   -8.1100 -137.6600      20.8        56       113        60
OIR    2025130    131400   -8.1100 -137.6700      20.7        56       113        60
OIR    2025130    131400   -8.1100 -137.6800      20.7        55       113        60
OIR    2025130    131400   -8.1100 -137.6900      20.6        55       112        60
OIR    2025130    131400   -8.1100 -137.7000      20.1        54       112        60
OIR    2025130    131400   -8.1100 -137.7100      18.8        51       114        60
OIR    2025130    131400   -8.1100 -137.7200      16.4        44       117        60
OIR    2025130    131400   -8.1100 -137.7300      11.8        11       117        60
OIR    2025130    131400   -8.1100 -137.7400      11.8       359       116        60
OIR    2025130    131400   -8.1100 -137.7500      12.1       352       114        60
OIR    2025130    131400   -8.1100 -137.7600      12.1       350       110        60
OIR    2025130    131400   -8.1100 -137.7700      12.1       348       108        60
OIR    2025130    131400   -8.1100 -137.7800      12.0       345       105        60
OIR    2025130    131400   -8.1100 -137.7900      11.8       342       104        60
OIR    2025130    131400   -8.1100 -137.8000      11.5       338       103        60
OIR    2025130    131400   -8.1100 -137.8100      11.3       332       103        60
OIR    2025130    131400   -8.1100 -137.8200      11.3       331       103        60
OIR    2025130    131400   -8.1100 -137.8300      11.3       331       103        60
OIR    2025130    131400   -8.1100 -137.8400      11.2       330       103        60
OIR    2025130    131400   -8.1100 -137.8500      11.2       330       103        60
OIR    2025130    131400   -8.1100 -137.8600      11.2       329       103        60
OIR    2025130    131400   -8.1100 -137.8700      11.2       328       103        60
OIR    2025130    131400   -8.1100 -137.8800      11.3       328       103        60
OIR    2025130    131400   -8.1100 -137.8900      11.3       327       103        60
OIR    2025130    131400   -8.1100 -137.9000      11.3       325       103        60
OIR    2025130    131400   -8.1100 -137.9100      11.4       324       103        60
OIR    2025130    131400   -8.1100 -137.9200      11.4       324       103        60
OIR    2025130    131400   -8.1100 -137.9300      11.5       323       103        60
OIR    2025130    131400   -8.1100 -137.9400      11.6       323       103        60
OIR    2025130    131400   -8.1100 -137.9500      11.8       323       103        60
OIR    2025130    131400   -8.1100 -137.9600      12.1       325       103        60
OIR    2025130    131400   -8.1100 -137.9700      12.2       328       103        60
OIR    2025130    131400   -8.1100 -137.9800      12.4       335       104        60
OIR    2025130    131400   -8.1100 -137.9900      12.6       347       104        60
OIR    2025130    131400   -8.1100 -138.0000      14.0         8       110        60
OIR    2025130    131400   -8.1100 -138.0100      14.3         8       127        60
OIR    2025130    131400   -8.1100 -138.0200      13.0       349       144        60
OIR    2025130    131400   -8.1200 -137.2000      11.0       128       144        60
OIR    2025130    131400   -8.1200 -137.5100      19.3        74       144        60
OIR    2025130    131400   -8.1200 -137.5200      21.4        72       138        60
OIR    2025130    131400   -8.1200 -137.5300      22.8        70       133        60
OIR    2025130    131400   -8.1200 -137.5400      23.5        68       133        60
OIR    2025130    131400   -8.1200 -137.5500      23.9        67       132        60
OIR    2025130    131400   -8.1200 -137.5600      24.2        65       132        60
OIR    2025130    131400   -8.1200 -137.5700      24.1        64       130        60
OIR    2025130    131400   -8.1200 -137.5800      23.4        62       127        60
OIR    2025130    131400   -8.1200 -137.5900      22.4        61       126        60
OIR    2025130    131400   -8.1200 -137.6000      21.4        59       125        60
OIR    2025130    131400   -8.1200 -137.6100      21.1        58       122        60
OIR    2025130    131400   -8.1200 -137.6200      21.0        57       119        60
OIR    2025130    131400   -8.1200 -137.6300      20.8        56       117        60
OIR    2025130    131400   -8.1200 -137.6400      20.8        56       116        60
OIR    2025130    131400   -8.1200 -137.6500      20.8        56       114        60
OIR    2025130    131400   -8.1200 -137.6600      20.8        56       113        60
OIR    2025130    131400   -8.1200 -137.6700      20.8        56       112        60
OIR    2025130    131400   -8.1200 -137.6800      20.8        55       111        60
OIR    2025130    131400   -8.1200 -137.6900      20.7        55       109        60
OIR    2025130    131400   -8.1200 -137.7000      20.4        55       110        60
OIR    2025130    131400   -8.1200 -137.7100      19.3        52       111        60
OIR    2025130    131400   -8.1200 -137.7200      17.0        46       115        60
OIR    2025130    131400   -8.1200 -137.7300      12.8        27       116        60
OIR    2025130    131400   -8.1200 -137.7400      11.9        10       115        60
OIR    2025130    131400   -8.1200 -137.7500      11.9       359       112        60
OIR    2025130    131400   -8.1200 -137.7600      12.1       353       107        60
OIR    2025130    131400   -8.1200 -137.7700      12.1       350       104        60
OIR    2025130    131400   -8.1200 -137.7800      11.9       346       104        60
OIR    2025130    131400   -8.1200 -137.7900      11.7       342       103        60
OIR    2025130    131400   -8.1200 -137.8000      11.4       337       103        60
OIR    2025130    131400   -8.1200 -137.8100      11.3       333       103        60
OIR    2025130    131400   -8.1200 -137.8200      11.2       332       103        60
OIR    2025130    131400   -8.1200 -137.8300      11.3       331       103        60
OIR    2025130    131400   -8.1200 -137.8400      11.3       331       103        60
OIR    2025130    131400   -8.1200 -137.8500      11.3       330       103        60
OIR    2025130    131400   -8.1200 -137.8600      11.3       330       103        60
OIR    2025130    131400   -8.1200 -137.8700      11.4       330       103        60
OIR    2025130    131400   -8.1200 -137.8800      11.5       329       103        60
OIR    2025130    131400   -8.1200 -137.8900      11.6       328       103        60
OIR    2025130    131400   -8.1200 -137.9000      11.7       327       103        60
OIR    2025130    131400   -8.1200 -137.9100      11.7       325       103        60
OIR    2025130    131400   -8.1200 -137.9200      11.8       324       103        60
OIR    2025130    131400   -8.1200 -137.9300      12.0       323       103        60
OIR    2025130    131400   -8.1200 -137.9400      12.3       323       103        60
OIR    2025130    131400   -8.1200 -137.9500      12.7       323       103        60
OIR    2025130    131400   -8.1200 -137.9600      13.1       325       103        60
OIR    2025130    131400   -8.1200 -137.9700      13.4       329       103        60
OIR    2025130    131400   -8.1200 -137.9800      13.9       336       103        60
OIR    2025130    131400   -8.1200 -137.9900      14.3       345       104        60
OIR    2025130    131400   -8.1200 -138.0000      15.3         6       109        60
OIR    2025130    131400   -8.1200 -138.0100      15.5         6       127        60
OIR    2025130    131400   -8.1300 -137.5000      17.2        75       143        60
OIR    2025130    131400   -8.1300 -137.5100      18.4        74       139        60
OIR    2025130    131400   -8.1300 -137.5200      20.3        72       135        60
OIR    2025130    131400   -8.1300 -137.5300      21.9        70       132        60
OIR    2025130    131400   -8.1300 -137.5400      22.7        68       131        60
OIR    2025130    131400   -8.1300 -137.5500      22.9        67       130        60
OIR    2025130    131400   -8.1300 -137.5600      23.1        65       130        60
OIR    2025130    131400   -8.1300 -137.5700      23.1        63       130        60
OIR    2025130    131400   -8.1300 -137.5800      22.6        62       129        60
OIR    2025130    131400   -8.1300 -137.5900      22.0        60       127        60
OIR    2025130    131400   -8.1300 -137.6000      21.2        58       125        60
OIR    2025130    131400   -8.1300 -137.6100      21.1        58       121        60
OIR    2025130    131400   -8.1300 -137.6200      21.0        58       119        60
OIR    2025130    131400   -8.1300 -137.6300      20.9        57       119        60
OIR    2025130    131400   -8.1300 -137.6400      20.8        56       117        60
OIR    2025130    131400   -8.1300 -137.6500      20.8        56       116        60
OIR    2025130    131400   -8.1300 -137.6600      20.8        56       115        60
OIR    2025130    131400   -8.1300 -137.6700      20.8        56       113        60
OIR    2025130    131400   -8.1300 -137.6800      20.8        55       112        60
OIR    2025130    131400   -8.1300 -137.6900      20.8        55       110        60
OIR    2025130    131400   -8.1300 -137.7000      20.7        55       109        60
OIR    2025130    131400   -8.1300 -137.7100      20.0        54       110        60
OIR    2025130    131400   -8.1300 -137.7200      18.1        50       114        60
OIR    2025130    131400   -8.1300 -137.7300      15.3        42       115        60
OIR    2025130    131400   -8.1300 -137.7400      14.0        32       115        60
OIR    2025130    131400   -8.1300 -137.7500      12.5        18       113        60
OIR    2025130    131400   -8.1300 -137.7600      11.8         8       108        60
OIR    2025130    131400   -8.1300 -137.7700      11.5       357       104        60
OIR    2025130    131400   -8.1300 -137.7800      11.6       349       103        60
OIR    2025130    131400   -8.1300 -137.7900      11.5       343       103        60
OIR    2025130    131400   -8.1300 -137.8000      11.3       337       103        60
OIR    2025130    131400   -8.1300 -137.8100      11.3       334       103        60
OIR    2025130    131400   -8.1300 -137.8200      11.3       332       103        60
OIR    2025130    131400   -8.1300 -137.8300      11.3       332       103        60
OIR    2025130    131400   -8.1300 -137.8400      11.3       331       103        60
OIR    2025130    131400   -8.1300 -137.8500      11.3       331       103        60
OIR    2025130    131400   -8.1300 -137.8600      11.4       331       103        60
OIR    2025130    131400   -8.1300 -137.8700      11.4       330       103        60
OIR    2025130    131400   -8.1300 -137.8800      11.6       329       103        60
OIR    2025130    131400   -8.1300 -137.8900      11.7       328       103        60
OIR    2025130    131400   -8.1300 -137.9000      11.8       327       103        60
OIR    2025130    131400   -8.1300 -137.9100      11.9       326       103        60
OIR    2025130    131400   -8.1300 -137.9200      12.2       325       103        60
OIR    2025130    131400   -8.1300 -137.9300      12.9       323       103        60
OIR    2025130    131400   -8.1300 -137.9400      13.6       323       103        60
OIR    2025130    131400   -8.1300 -137.9500      14.2       324       103        60
OIR    2025130    131400   -8.1300 -137.9600      14.6       326       103        60
OIR    2025130    131400   -8.1300 -137.9700      15.0       331       103        60
OIR    2025130    131400   -8.1300 -137.9800      15.9       336       103        60
OIR    2025130    131400   -8.1300 -137.9900      17.1       342       104        60
OIR    2025130    131400   -8.1300 -138.0000      16.7       360       112        60
OIR    2025130    131400   -8.1300 -138.0100      16.8         2       131        60
OIR    2025130    131400   -8.1400 -137.5000      17.1        74       139        60
OIR    2025130    131400   -8.1400 -137.5100      18.0        73       133        60
OIR    2025130    131400   -8.1400 -137.5200      19.4        72       132        60
OIR    2025130    131400   -8.1400 -137.5300      21.0        70       131        60
OIR    2025130    131400   -8.1400 -137.5400      21.8        68       129        60
OIR    2025130    131400   -8.1400 -137.5500      22.2        66       128        60
OIR    2025130    131400   -8.1400 -137.5600      22.1        65       129        60
OIR    2025130    131400   -8.1400 -137.5700      22.1        63       129        60
OIR    2025130    131400   -8.1400 -137.5800      22.0        62       130        60
OIR    2025130    131400   -8.1400 -137.5900      21.6        60       127        60
OIR    2025130    131400   -8.1400 -137.6000      21.1        59       124        60
OIR    2025130    131400   -8.1400 -137.6100      21.0        58       120        60
OIR    2025130    131400   -8.1400 -137.6200      21.0        58       119        60
OIR    2025130    131400   -8.1400 -137.6300      20.9        57       121        60
OIR    2025130    131400   -8.1400 -137.6400      20.9        56       121        60
OIR    2025130    131400   -8.1400 -137.6500      20.9        56       117        60
OIR    2025130    131400   -8.1400 -137.6600      20.8        56       116        60
OIR    2025130    131400   -8.1400 -137.6700      20.8        56       116        60
OIR    2025130    131400   -8.1400 -137.6800      20.8        56       114        60
OIR    2025130    131400   -8.1400 -137.6900      20.8        55       112        60
OIR    2025130    131400   -8.1400 -137.7000      20.8        55       109        60
OIR    2025130    131400   -8.1400 -137.7100      20.6        55       109        60
OIR    2025130    131400   -8.1400 -137.7200      19.2        53       113        60
OIR    2025130    131400   -8.1400 -137.7300      17.9        51       115        60
OIR    2025130    131400   -8.1400 -137.7400      17.3        48       115        60
OIR    2025130    131400   -8.1400 -137.7500      15.3        42       114        60
OIR    2025130    131400   -8.1400 -137.7600      13.5        34       110        60
OIR    2025130    131400   -8.1400 -137.7700      11.9        22       105        60
OIR    2025130    131400   -8.1400 -137.7800      11.1         4       103        60
OIR    2025130    131400   -8.1400 -137.7900      11.1       347       103        60
OIR    2025130    131400   -8.1400 -137.8000      11.1       339       103        60
OIR    2025130    131400   -8.1400 -137.8100      11.2       334       103        60
OIR    2025130    131400   -8.1400 -137.8200      11.3       333       103        60
OIR    2025130    131400   -8.1400 -137.8300      11.2       332       103        60
OIR    2025130    131400   -8.1400 -137.8400      11.3       332       103        60
OIR    2025130    131400   -8.1400 -137.8500      11.3       332       103        60
OIR    2025130    131400   -8.1400 -137.8600      11.4       331       103        60
OIR    2025130    131400   -8.1400 -137.8700      11.5       331       103        60
OIR    2025130    131400   -8.1400 -137.8800      11.6       330       103        60
OIR    2025130    131400   -8.1400 -137.8900      11.8       329       103        60
OIR    2025130    131400   -8.1400 -137.9000      12.0       328       103        60
OIR    2025130    131400   -8.1400 -137.9100      12.3       327       103        60
OIR    2025130    131400   -8.1400 -137.9200      12.8       326       103        60
OIR    2025130    131400   -8.1400 -137.9300      13.9       324       103        60
OIR    2025130    131400   -8.1400 -137.9400      14.9       324       103        60
OIR    2025130    131400   -8.1400 -137.9500      16.1       325       103        60
OIR    2025130    131400   -8.1400 -137.9600      17.0       328       103        60
OIR    2025130    131400   -8.1400 -137.9700      18.8       333       103        60
OIR    2025130    131400   -8.1400 -137.9800      19.8       337       103        60
OIR    2025130    131400   -8.1400 -137.9900      19.8       342       107        60
OIR    2025130    131400   -8.1400 -138.0000      19.0       354       114        60
OIR    2025130    131400   -8.1400 -138.0100      18.8       355       134        60
OIR    2025130    131400   -8.1400 -141.2500      19.7       282       136        60
OIR    2025130    131400   -8.1400 -141.2600      16.4       272       139        60
OIR    2025130    131400   -8.1500 -137.5000      17.0        73       140        60
OIR    2025130    131400   -8.1500 -137.5100      17.8        72       134        60
OIR    2025130    131400   -8.1500 -137.5200      18.4        71       130        60
OIR    2025130    131400   -8.1500 -137.5300      19.7        70       127        60
OIR    2025130    131400   -8.1500 -137.5400      20.8        68       127        60
OIR    2025130    131400   -8.1500 -137.5500      21.2        66       127        60
OIR    2025130    131400   -8.1500 -137.5600      21.2        64       127        60
OIR    2025130    131400   -8.1500 -137.5700      21.3        63       128        60
OIR    2025130    131400   -8.1500 -137.5800      21.4        62       129        60
OIR    2025130    131400   -8.1500 -137.5900      21.2        60       126        60
OIR    2025130    131400   -8.1500 -137.6000      21.0        59       124        60
OIR    2025130    131400   -8.1500 -137.6100      20.9        58       120        60
OIR    2025130    131400   -8.1500 -137.6200      20.9        58       119        60
OIR    2025130    131400   -8.1500 -137.6300      20.9        57       121        60
OIR    2025130    131400   -8.1500 -137.6400      20.9        56       121        60
OIR    2025130    131400   -8.1500 -137.6500      20.9        56       120        60
OIR    2025130    131400   -8.1500 -137.6600      20.8        56       119        60
OIR    2025130    131400   -8.1500 -137.6700      20.8        56       117        60
OIR    2025130    131400   -8.1500 -137.6800      20.8        56       117        60
OIR    2025130    131400   -8.1500 -137.6900      20.8        55       116        60
OIR    2025130    131400   -8.1500 -137.7000      20.8        55       112        60
OIR    2025130    131400   -8.1500 -137.7100      20.7        55       110        60
OIR    2025130    131400   -8.1500 -137.7200      19.6        54       112        60
OIR    2025130    131400   -8.1500 -137.7300      18.9        54       113        60
OIR    2025130    131400   -8.1500 -137.7400      18.6        53       113        60
OIR    2025130    131400   -8.1500 -137.7500      17.7        52       111        60
OIR    2025130    131400   -8.1500 -137.7600      16.0        47       108        60
OIR    2025130    131400   -8.1500 -137.7700      14.1        40       104        60
OIR    2025130    131400   -8.1500 -137.7800      11.8        25       103        60
OIR    2025130    131400   -8.1500 -137.7900      10.6       359       103        60
OIR    2025130    131400   -8.1500 -137.8000      10.7       345       103        60
OIR    2025130    131400   -8.1500 -137.8100      11.1       336       103        60
OIR    2025130    131400   -8.1500 -137.8200      11.2       334       103        60
OIR    2025130    131400   -8.1500 -137.8300      11.2       334       103        60
OIR    2025130    131400   -8.1500 -137.8400      11.3       333       103        60
OIR    2025130    131400   -8.1500 -137.8500      11.4       333       103        60
OIR    2025130    131400   -8.1500 -137.8600      11.5       332       103        60
OIR    2025130    131400   -8.1500 -137.8700      11.6       332       103        60
OIR    2025130    131400   -8.1500 -137.8800      11.8       331       103        60
OIR    2025130    131400   -8.1500 -137.8900      12.0       330       103        60
OIR    2025130    131400   -8.1500 -137.9000      12.3       329       103        60
OIR    2025130    131400   -8.1500 -137.9100      13.0       327       103        60
OIR    2025130    131400   -8.1500 -137.9200      14.1       326       103        60
OIR    2025130    131400   -8.1500 -137.9300      15.5       325       103        60
OIR    2025130    131400   -8.1500 -137.9400      17.2       326       103        60
OIR    2025130    131400   -8.1500 -137.9500      19.8       325       103        60
OIR    2025130    131400   -8.1500 -137.9600      22.5       327       103        60
OIR    2025130    131400   -8.1500 -137.9700      23.4       331       104        60
OIR    2025130    131400   -8.1500 -137.9800      23.1       336       104        60
OIR    2025130    131400   -8.1500 -137.9900      22.1       342       108        60
OIR    2025130    131400   -8.1500 -138.0000      21.2       351       115        60
OIR    2025130    131400   -8.1500 -138.0100      20.7       352       133        60
OIR    2025130    131400   -8.1600 -137.5000      17.0        72       141        60
OIR    2025130    131400   -8.1600 -137.5100      17.6        71       135        60
OIR    2025130    131400   -8.1600 -137.5200      18.1        70       129        60
OIR    2025130    131400   -8.1600 -137.5300      18.7        69       126        60
OIR    2025130    131400   -8.1600 -137.5400      19.7        67       125        60
OIR    2025130    131400   -8.1600 -137.5500      20.3        66       126        60
OIR    2025130    131400   -8.1600 -137.5600      20.5        64       127        60
OIR    2025130    131400   -8.1600 -137.5700      20.6        63       127        60
OIR    2025130    131400   -8.1600 -137.5800      20.7        62       128        60
OIR    2025130    131400   -8.1600 -137.5900      20.6        60       126        60
OIR    2025130    131400   -8.1600 -137.6000      20.6        59       124        60
OIR    2025130    131400   -8.1600 -137.6100      20.7        58       120        60
OIR    2025130    131400   -8.1600 -137.6200      20.8        58       119        60
OIR    2025130    131400   -8.1600 -137.6300      20.8        57       120        60
OIR    2025130    131400   -8.1600 -137.6400      20.8        56       121        60
OIR    2025130    131400   -8.1600 -137.6500      20.8        56       121        60
OIR    2025130    131400   -8.1600 -137.6600      20.8        56       120        60
OIR    2025130    131400   -8.1600 -137.6700      20.8        56       120        60
OIR    2025130    131400   -8.1600 -137.6800      20.8        56       121        60
OIR    2025130    131400   -8.1600 -137.6900      20.8        56       121        60
OIR    2025130    131400   -8.1600 -137.7000      20.8        55       115        60
OIR    2025130    131400   -8.1600 -137.7100      20.6        55       111        60
OIR    2025130    131400   -8.1600 -137.7200      19.7        54       112        60
OIR    2025130    131400   -8.1600 -137.7300      19.0        54       112        60
OIR    2025130    131400   -8.1600 -137.7400      18.8        54       112        60
OIR    2025130    131400   -8.1600 -137.7500      18.6        54       110        60
OIR    2025130    131400   -8.1600 -137.7600      17.5        52       107        60
OIR    2025130    131400   -8.1600 -137.7700      16.0        49       104        60
OIR    2025130    131400   -8.1600 -137.7800      13.7        41       103        60
OIR    2025130    131400   -8.1600 -137.7900      10.9        20       103        60
OIR    2025130    131400   -8.1600 -137.8000      10.1       358       103        60
OIR    2025130    131400   -8.1600 -137.8100      10.7       341       103        60
OIR    2025130    131400   -8.1600 -137.8200      11.0       338       103        60
OIR    2025130    131400   -8.1600 -137.8300      11.1       336       103        60
OIR    2025130    131400   -8.1600 -137.8400      11.3       335       103        60
OIR    2025130    131400   -8.1600 -137.8500      11.5       334       103        60
OIR    2025130    131400   -8.1600 -137.8600      11.6       334       103        60
OIR    2025130    131400   -8.1600 -137.8700      11.8       333       103        60
OIR    2025130    131400   -8.1600 -137.8800      12.0       333       103        60
OIR    2025130    131400   -8.1600 -137.8900      12.3       332       103        60
OIR    2025130    131400   -8.1600 -137.9000      12.9       331       103        60
OIR    2025130    131400   -8.1600 -137.9100      14.4       329       103        60
OIR    2025130    131400   -8.1600 -137.9200      16.0       327       103        60
OIR    2025130    131400   -8.1600 -137.9300      18.1       327       103        60
OIR    2025130    131400   -8.1600 -137.9400      21.0       327       103        60
OIR    2025130    131400   -8.1600 -137.9500      25.0       326       103        60
OIR    2025130    131400   -8.1600 -137.9600      27.5       327       103        60
OIR    2025130    131400   -8.1600 -137.9700      28.2       329       104        60
OIR    2025130    131400   -8.1600 -137.9800      27.5       333       107        60
OIR    2025130    131400   -8.1600 -137.9900      25.2       339       111        60
OIR    2025130    131400   -8.1600 -138.0000      23.5       348       116        60
OIR    2025130    131400   -8.1600 -138.0100      23.4       348       133        60
OIR    2025130    131400   -8.1700 -137.5000      16.9        70       143        60
OIR    2025130    131400   -8.1700 -137.5100      17.4        70       137        60
OIR    2025130    131400   -8.1700 -137.5200      17.8        69       133        60
OIR    2025130    131400   -8.1700 -137.5300      18.3        68       129        60
OIR    2025130    131400   -8.1700 -137.5400      18.9        67       126        60
OIR    2025130    131400   -8.1700 -137.5500      19.4        65       126        60
OIR    2025130    131400   -8.1700 -137.5600      19.6        64       127        60
OIR    2025130    131400   -8.1700 -137.5700      19.7        63       126        60
OIR    2025130    131400   -8.1700 -137.5800      19.9        62       126        60
OIR    2025130    131400   -8.1700 -137.5900      19.5        60       127        60
OIR    2025130    131400   -8.1700 -137.6000      19.7        59       126        60
OIR    2025130    131400   -8.1700 -137.6100      20.0        59       122        60
OIR    2025130    131400   -8.1700 -137.6200      20.4        58       120        60
OIR    2025130    131400   -8.1700 -137.6300      20.5        57       120        60
OIR    2025130    131400   -8.1700 -137.6400      20.6        57       121        60
OIR    2025130    131400   -8.1700 -137.6500      20.7        56       121        60
OIR    2025130    131400   -8.1700 -137.6600      20.8        56       121        60
OIR    2025130    131400   -8.1700 -137.6700      20.8        56       122        60
OIR    2025130    131400   -8.1700 -137.6800      20.8        56       122        60
OIR    2025130    131400   -8.1700 -137.6900      20.8        56       123        60
OIR    2025130    131400   -8.1700 -137.7000      20.7        55       119        60
OIR    2025130    131400   -8.1700 -137.7100      20.4        55       115        60
OIR    2025130    131400   -8.1700 -137.7200      19.6        55       114        60
OIR    2025130    131400   -8.1700 -137.7300      19.0        55       113        60
OIR    2025130    131400   -8.1700 -137.7400      18.8        55       114        60
OIR    2025130    131400   -8.1700 -137.7500      18.7        54       113        60
OIR    2025130    131400   -8.1700 -137.7600      18.2        54       110        60
OIR    2025130    131400   -8.1700 -137.7700      17.2        52       105        60
OIR    2025130    131400   -8.1700 -137.7800      15.3        48       103        60
OIR    2025130    131400   -8.1700 -137.7900      12.4        37       103        60
OIR    2025130    131400   -8.1700 -137.8000      10.3        13       103        60
OIR    2025130    131400   -8.1700 -137.8100      10.4       352       103        60
OIR    2025130    131400   -8.1700 -137.8200      10.8       345       103        60
OIR    2025130    131400   -8.1700 -137.8300      11.0       341       103        60
OIR    2025130    131400   -8.1700 -137.8400      11.4       338       103        60
OIR    2025130    131400   -8.1700 -137.8500      11.5       336       103        60
OIR    2025130    131400   -8.1700 -137.8600      11.7       335       103        60
OIR    2025130    131400   -8.1700 -137.8700      11.9       335       103        60
OIR    2025130    131400   -8.1700 -137.8800      12.2       335       103        60
OIR    2025130    131400   -8.1700 -137.8900      12.7       334       103        60
OIR    2025130    131400   -8.1700 -137.9000      13.9       333       103        60
OIR    2025130    131400   -8.1700 -137.9100      16.2       331       103        60
OIR    2025130    131400   -8.1700 -137.9200      18.8       329       103        60
OIR    2025130    131400   -8.1700 -137.9300      21.9       329       103        60
OIR    2025130    131400   -8.1700 -137.9400      24.9       329       103        60
OIR    2025130    131400   -8.1700 -137.9500      29.0       327       103        60
OIR    2025130    131400   -8.1700 -137.9600      31.0       328       103        60
OIR    2025130    131400   -8.1700 -137.9700      31.5       329       105        60
OIR    2025130    131400   -8.1700 -137.9800      31.1       332       110        60
OIR    2025130    131400   -8.1700 -137.9900      28.6       336       114        60
OIR    2025130    131400   -8.1700 -138.0000      26.8       344       122        60
OIR    2025130    131400   -8.1700 -138.0100      28.0       343       140        60
OIR    2025130    131400   -8.1800 -137.5000      17.1        69       143        60
OIR    2025130    131400   -8.1800 -137.5100      17.3        69       138        60
OIR    2025130    131400   -8.1800 -137.5200      17.6        68       135        60
OIR    2025130    131400   -8.1800 -137.5300      18.0        67       131        60
OIR    2025130    131400   -8.1800 -137.5400      18.3        66       127        60
OIR    2025130    131400   -8.1800 -137.5500      18.5        65       126        60
OIR    2025130    131400   -8.1800 -137.5600      18.6        64       126        60
OIR    2025130    131400   -8.1800 -137.5700      18.6        63       126        60
OIR    2025130    131400   -8.1800 -137.5800      18.7        62       125        60
OIR    2025130    131400   -8.1800 -137.5900      18.5        60       128        60
OIR    2025130    131400   -8.1800 -137.6000      18.8        60       128        60
OIR    2025130    131400   -8.1800 -137.6100      19.1        59       123        60
OIR    2025130    131400   -8.1800 -137.6200      19.8        58       121        60
OIR    2025130    131400   -8.1800 -137.6300      20.1        58       121        60
OIR    2025130    131400   -8.1800 -137.6400      20.2        57       121        60
OIR    2025130    131400   -8.1800 -137.6500      20.2        57       121        60
OIR    2025130    131400   -8.1800 -137.6600      20.4        56       121        60
OIR    2025130    131400   -8.1800 -137.6700      20.6        56       122        60
OIR    2025130    131400   -8.1800 -137.6800      20.7        56       123        60
OIR    2025130    131400   -8.1800 -137.6900      20.6        56       125        60
OIR    2025130    131400   -8.1800 -137.7000      20.3        55       122        60
OIR    2025130    131400   -8.1800 -137.7100      19.9        55       119        60
OIR    2025130    131400   -8.1800 -137.7200      19.4        55       115        60
OIR    2025130    131400   -8.1800 -137.7300      18.9        55       115        60
OIR    2025130    131400   -8.1800 -137.7400      18.8        55       116        60
OIR    2025130    131400   -8.1800 -137.7500      18.6        54       114        60
OIR    2025130    131400   -8.1800 -137.7600      18.4        54       111        60
OIR    2025130    131400   -8.1800 -137.7700      17.9        54       107        60
OIR    2025130    131400   -8.1800 -137.7800      16.6        52       103        60
OIR    2025130    131400   -8.1800 -137.7900      13.8        44       103        60
OIR    2025130    131400   -8.1800 -137.8000      11.3        23       103        60
OIR    2025130    131400   -8.1800 -137.8100      11.4         7       103        60
OIR    2025130    131400   -8.1800 -137.8200      11.6       358       103        60
OIR    2025130    131400   -8.1800 -137.8300      11.9       351       103        60
OIR    2025130    131400   -8.1800 -137.8400      13.0       351       103        60
OIR    2025130    131400   -8.1800 -137.8500      13.3       350       103        60
OIR    2025130    131400   -8.1800 -137.8600      12.2       342       103        60
OIR    2025130    131400   -8.1800 -137.8700      12.3       339       103        60
OIR    2025130    131400   -8.1800 -137.8800      12.9       339       103        60
OIR    2025130    131400   -8.1800 -137.8900      13.9       339       103        60
OIR    2025130    131400   -8.1800 -137.9000      15.6       336       103        60
OIR    2025130    131400   -8.1800 -137.9100      17.7       333       103        60
OIR    2025130    131400   -8.1800 -137.9200      20.4       330       103        60
OIR    2025130    131400   -8.1800 -137.9300      23.6       329       103        60
OIR    2025130    131400   -8.1800 -137.9400      26.1       329       103        60
OIR    2025130    131400   -8.1800 -137.9500      30.6       327       104        60
OIR    2025130    131400   -8.1800 -137.9600      32.3       328       105        60
OIR    2025130    131400   -8.1800 -137.9700      33.2       329       110        60
OIR    2025130    131400   -8.1800 -137.9800      33.3       331       114        60
OIR    2025130    131400   -8.1800 -137.9900      32.3       334       121        60
OIR    2025130    131400   -8.1800 -138.0000      30.0       339       132        60
OIR    2025130    131400   -8.1900 -137.4800      16.1        68       144        60
OIR    2025130    131400   -8.1900 -137.4900      16.6        68       142        60
OIR    2025130    131400   -8.1900 -137.5000      17.0        68       139        60
OIR    2025130    131400   -8.1900 -137.5100      17.2        68       136        60
OIR    2025130    131400   -8.1900 -137.5200      17.3        67       134        60
OIR    2025130    131400   -8.1900 -137.5300      17.6        66       130        60
OIR    2025130    131400   -8.1900 -137.5400      17.7        65       126        60
OIR    2025130    131400   -8.1900 -137.5500      17.7        65       125        60
OIR    2025130    131400   -8.1900 -137.5600      17.7        64       125        60
OIR    2025130    131400   -8.1900 -137.5700      17.7        63       126        60
OIR    2025130    131400   -8.1900 -137.5800      17.9        62       127        60
OIR    2025130    131400   -8.1900 -137.5900      17.9        61       127        60
OIR    2025130    131400   -8.1900 -137.6000      18.1        60       126        60
OIR    2025130    131400   -8.1900 -137.6100      18.4        59       124        60
OIR    2025130    131400   -8.1900 -137.6200      18.8        59       123        60
OIR    2025130    131400   -8.1900 -137.6300      19.2        58       121        60
OIR    2025130    131400   -8.1900 -137.6400      19.3        58       121        60
OIR    2025130    131400   -8.1900 -137.6500      19.3        58       121        60
OIR    2025130    131400   -8.1900 -137.6600      19.4        57       120        60
OIR    2025130    131400   -8.1900 -137.6700      19.7        57       117        60
OIR    2025130    131400   -8.1900 -137.6800      20.0        56       121        60
OIR    2025130    131400   -8.1900 -137.6900      20.1        56       125        60
OIR    2025130    131400   -8.1900 -137.7000      19.7        55       123        60
OIR    2025130    131400   -8.1900 -137.7100      19.4        55       122        60
OIR    2025130    131400   -8.1900 -137.7200      19.0        55       119        60
OIR    2025130    131400   -8.1900 -137.7300      18.8        54       116        60
OIR    2025130    131400   -8.1900 -137.7400      18.7        54       116        60
OIR    2025130    131400   -8.1900 -137.7500      18.6        54       113        60
OIR    2025130    131400   -8.1900 -137.7600      18.4        54       108        60
OIR    2025130    131400   -8.1900 -137.7700      18.2        54       104        60
OIR    2025130    131400   -8.1900 -137.7800      17.4        53       103        60
OIR    2025130    131400   -8.1900 -137.7900      14.8        45       103        60
OIR    2025130    131400   -8.1900 -137.8000      13.0        28       103        60
OIR    2025130    131400   -8.1900 -137.8100      13.3        16       103        60
OIR    2025130    131400   -8.1900 -137.8200      14.3         9       103        60
OIR    2025130    131400   -8.1900 -137.8300      16.0         5       103        60
OIR    2025130    131400   -8.1900 -137.8400      18.1         4       103        60
OIR    2025130    131400   -8.1900 -137.8500      19.1         6       103        60
OIR    2025130    131400   -8.1900 -137.8600      18.4         4       103        60
OIR    2025130    131400   -8.1900 -137.8700      16.1       356       103        60
OIR    2025130    131400   -8.1900 -137.8800      15.0       350       103        60
OIR    2025130    131400   -8.1900 -137.8900      15.9       345       103        60
OIR    2025130    131400   -8.1900 -137.9000      17.3       341       103        60
OIR    2025130    131400   -8.1900 -137.9100      19.3       337       103        60
OIR    2025130    131400   -8.1900 -137.9200      22.0       333       103        60
OIR    2025130    131400   -8.1900 -137.9300      25.5       330       103        60
OIR    2025130    131400   -8.1900 -137.9400      27.6       329       103        60
OIR    2025130    131400   -8.1900 -137.9500      31.4       328       107        60
OIR    2025130    131400   -8.1900 -137.9600      32.9       329       113        60
OIR    2025130    131400   -8.1900 -137.9700      34.7       330       116        60
OIR    2025130    131400   -8.1900 -137.9800      34.9       331       122        60
OIR    2025130    131400   -8.1900 -137.9900      32.3       334       136        60
OIR    2025130    131400   -8.2000 -137.4600      15.1        64       144        60
OIR    2025130    131400   -8.2000 -137.4700      15.5        65       140        60
OIR    2025130    131400   -8.2000 -137.4800      15.8        65       138        60
OIR    2025130    131400   -8.2000 -137.4900      16.3        66       136        60
OIR    2025130    131400   -8.2000 -137.5000      16.7        66       135        60
OIR    2025130    131400   -8.2000 -137.5100      16.9        66       134        60
OIR    2025130    131400   -8.2000 -137.5200      17.1        66       133        60
OIR    2025130    131400   -8.2000 -137.5300      17.2        65       130        60
OIR    2025130    131400   -8.2000 -137.5400      17.2        65       127        60
OIR    2025130    131400   -8.2000 -137.5500      17.2        64       125        60
OIR    2025130    131400   -8.2000 -137.5600      17.2        63       124        60
OIR    2025130    131400   -8.2000 -137.5700      17.3        62       126        60
OIR    2025130    131400   -8.2000 -137.5800      17.5        62       127        60
OIR    2025130    131400   -8.2000 -137.5900      17.6        61       127        60
OIR    2025130    131400   -8.2000 -137.6000      17.8        60       126        60
OIR    2025130    131400   -8.2000 -137.6100      17.9        60       125        60
OIR    2025130    131400   -8.2000 -137.6200      18.1        60       123        60
OIR    2025130    131400   -8.2000 -137.6300      18.3        59       122        60
OIR    2025130    131400   -8.2000 -137.6400      18.6        58       121        60
OIR    2025130    131400   -8.2000 -137.6500      18.9        58       122        60
OIR    2025130    131400   -8.2000 -137.6600      19.0        58       121        60
OIR    2025130    131400   -8.2000 -137.6700      19.0        58       119        60
OIR    2025130    131400   -8.2000 -137.6800      19.2        57       121        60
OIR    2025130    131400   -8.2000 -137.6900      19.3        56       124        60
OIR    2025130    131400   -8.2000 -137.7000      19.2        55       123        60
OIR    2025130    131400   -8.2000 -137.7100      19.0        55       122        60
OIR    2025130    131400   -8.2000 -137.7200      18.8        55       120        60
OIR    2025130    131400   -8.2000 -137.7300      18.7        54       116        60
OIR    2025130    131400   -8.2000 -137.7400      18.6        54       115        60
OIR    2025130    131400   -8.2000 -137.7500      18.5        54       111        60
OIR    2025130    131400   -8.2000 -137.7600      18.4        54       107        60
OIR    2025130    131400   -8.2000 -137.7700      18.2        54       104        60
OIR    2025130    131400   -8.2000 -137.7800      17.7        52       103        60
OIR    2025130    131400   -8.2000 -137.7900      15.8        43       103        60
OIR    2025130    131400   -8.2000 -137.8000      15.1        30       103        60
OIR    2025130    131400   -8.2000 -137.8100      15.5        21       103        60
OIR    2025130    131400   -8.2000 -137.8200      16.8        14       103        60
OIR    2025130    131400   -8.2000 -137.8300      19.2        11       103        60
OIR    2025130    131400   -8.2000 -137.8400      20.5        10       103        60
OIR    2025130    131400   -8.2000 -137.8500      20.9        11       103        60
OIR    2025130    131400   -8.2000 -137.8600      20.8        10       103        60
OIR    2025130    131400   -8.2000 -137.8700      19.5         7       103        60
OIR    2025130    131400   -8.2000 -137.8800      17.6       360       103        60
OIR    2025130    131400   -8.2000 -137.8900      17.3       351       103        60
OIR    2025130    131400   -8.2000 -137.9000      18.6       346       103        60
OIR    2025130    131400   -8.2000 -137.9100      20.5       340       103        60
OIR    2025130    131400   -8.2000 -137.9200      24.0       335       103        60
OIR    2025130    131400   -8.2000 -137.9300      28.2       331       104        60
OIR    2025130    131400   -8.2000 -137.9400      29.6       331       104        60
OIR    2025130    131400   -8.2000 -137.9500      33.6       330       113        60
OIR    2025130    131400   -8.2000 -137.9600      35.4       330       123        60
OIR    2025130    131400   -8.2000 -137.9700      35.5       330       129        60
OIR    2025130    131400   -8.2000 -137.9800      35.3       331       135        60
OIR    2025130    131400   -8.2100 -137.4200      11.3        60       141        60
OIR    2025130    131400   -8.2100 -137.4300      13.5        61       137        60
OIR    2025130    131400   -8.2100 -137.4400      14.5        62       139        60
OIR    2025130    131400   -8.2100 -137.4500      14.9        63       141        60
OIR    2025130    131400   -8.2100 -137.4600      15.2        63       138        60
OIR    2025130    131400   -8.2100 -137.4700      15.5        63       134        60
OIR    2025130    131400   -8.2100 -137.4800      15.7        64       133        60
OIR    2025130    131400   -8.2100 -137.4900      15.9        64       132        60
OIR    2025130    131400   -8.2100 -137.5000      16.2        64       132        60
OIR    2025130    131400   -8.2100 -137.5100      16.4        64       132        60
OIR    2025130    131400   -8.2100 -137.5200      16.6        64       133        60
OIR    2025130    131400   -8.2100 -137.5300      16.7        64       132        60
OIR    2025130    131400   -8.2100 -137.5400      16.7        64       129        60
OIR    2025130    131400   -8.2100 -137.5500      16.8        64       126        60
OIR    2025130    131400   -8.2100 -137.5600      16.8        63       124        60
OIR    2025130    131400   -8.2100 -137.5700      16.9        62       125        60
OIR    2025130    131400   -8.2100 -137.5800      17.1        62       127        60
OIR    2025130    131400   -8.2100 -137.5900      17.3        61       127        60
OIR    2025130    131400   -8.2100 -137.6000      17.5        60       126        60
OIR    2025130    131400   -8.2100 -137.6100      17.6        60       125        60
OIR    2025130    131400   -8.2100 -137.6200      17.8        60       124        60
OIR    2025130    131400   -8.2100 -137.6300      17.9        59       123        60
OIR    2025130    131400   -8.2100 -137.6400      18.0        59       122        60
OIR    2025130    131400   -8.2100 -137.6500      18.2        59       123        60
OIR    2025130    131400   -8.2100 -137.6600      18.4        58       123        60
OIR    2025130    131400   -8.2100 -137.6700      18.5        58       123        60
OIR    2025130    131400   -8.2100 -137.6800      18.6        57       122        60
OIR    2025130    131400   -8.2100 -137.6900      18.7        57       122        60
OIR    2025130    131400   -8.2100 -137.7000      18.7        56       122        60
OIR    2025130    131400   -8.2100 -137.7100      18.7        55       121        60
OIR    2025130    131400   -8.2100 -137.7200      18.6        54       119        60
OIR    2025130    131400   -8.2100 -137.7300      18.6        54       116        60
OIR    2025130    131400   -8.2100 -137.7400      18.5        54       114        60
OIR    2025130    131400   -8.2100 -137.7500      18.5        54       110        60
OIR    2025130    131400   -8.2100 -137.7600      18.4        53       107        60
OIR    2025130    131400   -8.2100 -137.7700      18.2        53       104        60
OIR    2025130    131400   -8.2100 -137.7800      17.5        50       103        60
OIR    2025130    131400   -8.2100 -137.7900      16.4        41       103        60
OIR    2025130    131400   -8.2100 -137.8000      16.2        30       103        60
OIR    2025130    131400   -8.2100 -137.8100      17.0        24       103        60
OIR    2025130    131400   -8.2100 -137.8200      18.6        19       103        60
OIR    2025130    131400   -8.2100 -137.8300      20.1        14       103        60
OIR    2025130    131400   -8.2100 -137.8400      20.8        12       103        60
OIR    2025130    131400   -8.2100 -137.8500      21.0        11       103        60
OIR    2025130    131400   -8.2100 -137.8600      21.1        11       103        60
OIR    2025130    131400   -8.2100 -137.8700      20.8        10       103        60
OIR    2025130    131400   -8.2100 -137.8800      19.5         6       103        60
OIR    2025130    131400   -8.2100 -137.8900      18.6       357       103        60
OIR    2025130    131400   -8.2100 -137.9000      19.3       350       103        60
OIR    2025130    131400   -8.2100 -137.9100      21.0       343       103        60
OIR    2025130    131400   -8.2100 -137.9200      25.7       335       103        60
OIR    2025130    131400   -8.2100 -137.9300      30.7       331       104        60
OIR    2025130    131400   -8.2100 -137.9400      31.3       331       109        60
OIR    2025130    131400   -8.2100 -137.9500      34.8       330       120        60
OIR    2025130    131400   -8.2100 -137.9600      35.3       330       134        60
OIR    2025130    131400   -8.2100 -137.9700      35.4       330       143        60
OIR    2025130    131400   -8.2200 -137.4100      10.5        61       143        60
OIR    2025130    131400   -8.2200 -137.4200      11.3        60       138        60
OIR    2025130    131400   -8.2200 -137.4300      13.6        61       134        60
OIR    2025130    131400   -8.2200 -137.4400      14.7        62       135        60
OIR    2025130    131400   -8.2200 -137.4500      15.1        62       136        60
OIR    2025130    131400   -8.2200 -137.4600      15.3        63       135        60
OIR    2025130    131400   -8.2200 -137.4700      15.5        63       133        60
OIR    2025130    131400   -8.2200 -137.4800      15.6        63       132        60
OIR    2025130    131400   -8.2200 -137.4900      15.8        63       131        60
OIR    2025130    131400   -8.2200 -137.5000      16.0        63       132        60
OIR    2025130    131400   -8.2200 -137.5100      16.1        63       132        60
OIR    2025130    131400   -8.2200 -137.5200      16.2        63       133        60
OIR    2025130    131400   -8.2200 -137.5300      16.2        63       132        60
OIR    2025130    131400   -8.2200 -137.5400      16.3        63       130        60
OIR    2025130    131400   -8.2200 -137.5500      16.3        63       128        60
OIR    2025130    131400   -8.2200 -137.5600      16.4        63       126        60
OIR    2025130    131400   -8.2200 -137.5700      16.6        62       126        60
OIR    2025130    131400   -8.2200 -137.5800      16.8        62       126        60
OIR    2025130    131400   -8.2200 -137.5900      16.9        61       126        60
OIR    2025130    131400   -8.2200 -137.6000      17.1        61       126        60
OIR    2025130    131400   -8.2200 -137.6100      17.4        60       126        60
OIR    2025130    131400   -8.2200 -137.6200      17.6        60       126        60
OIR    2025130    131400   -8.2200 -137.6300      17.7        59       124        60
OIR    2025130    131400   -8.2200 -137.6400      17.8        59       123        60
OIR    2025130    131400   -8.2200 -137.6500      17.9        59       123        60
OIR    2025130    131400   -8.2200 -137.6600      18.1        58       123        60
OIR    2025130    131400   -8.2200 -137.6700      18.2        58       123        60
OIR    2025130    131400   -8.2200 -137.6800      18.3        58       122        60
OIR    2025130    131400   -8.2200 -137.6900      18.4        57       122        60
OIR    2025130    131400   -8.2200 -137.7000      18.4        56       121        60
OIR    2025130    131400   -8.2200 -137.7100      18.4        55       120        60
OIR    2025130    131400   -8.2200 -137.7200      18.4        54       117        60
OIR    2025130    131400   -8.2200 -137.7300      18.4        54       116        60
OIR    2025130    131400   -8.2200 -137.7400      18.3        54       113        60
OIR    2025130    131400   -8.2200 -137.7500      18.3        53       110        60
OIR    2025130    131400   -8.2200 -137.7600      18.2        53       108        60
OIR    2025130    131400   -8.2200 -137.7700      18.0        52       105        60
OIR    2025130    131400   -8.2200 -137.7800      17.4        49       103        60
OIR    2025130    131400   -8.2200 -137.7900      16.7        39       103        60
OIR    2025130    131400   -8.2200 -137.8000      16.6        30       103        60
OIR    2025130    131400   -8.2200 -137.8100      17.3        26       103        60
OIR    2025130    131400   -8.2200 -137.8200      18.7        22       103        60
OIR    2025130    131400   -8.2200 -137.8300      20.3        17       104        60
OIR    2025130    131400   -8.2200 -137.8400      21.0        13       104        60
OIR    2025130    131400   -8.2200 -137.8500      21.1        12       103        60
OIR    2025130    131400   -8.2200 -137.8600      21.1        11       103        60
OIR    2025130    131400   -8.2200 -137.8700      21.1        11       103        60
OIR    2025130    131400   -8.2200 -137.8800      20.5         8       103        60
OIR    2025130    131400   -8.2200 -137.8900      20.2         1       103        60
OIR    2025130    131400   -8.2200 -137.9000      20.7       354       103        60
OIR    2025130    131400   -8.2200 -137.9100      22.2       347       104        60
OIR    2025130    131400   -8.2200 -137.9200      26.6       337       104        60
OIR    2025130    131400   -8.2200 -137.9300      31.2       331       108        60
OIR    2025130    131400   -8.2200 -137.9400      31.7       331       116        60
OIR    2025130    131400   -8.2200 -137.9500      34.0       329       128        60
OIR    2025130    131400   -8.2200 -137.9600      35.0       330       141        60
OIR    2025130    131400   -8.2300 -137.4000      10.6        62       144        60
OIR    2025130    131400   -8.2300 -137.4100      10.6        60       139        60
OIR    2025130    131400   -8.2300 -137.4200      11.2        60       136        60
OIR    2025130    131400   -8.2300 -137.4300      13.7        61       133        60
OIR    2025130    131400   -8.2300 -137.4400      14.8        62       133        60
OIR    2025130    131400   -8.2300 -137.4500      15.2        62       133        60
OIR    2025130    131400   -8.2300 -137.4600      15.4        63       133        60
OIR    2025130    131400   -8.2300 -137.4700      15.5        63       133        60
OIR    2025130    131400   -8.2300 -137.4800      15.6        63       132        60
OIR    2025130    131400   -8.2300 -137.4900      15.7        63       132        60
OIR    2025130    131400   -8.2300 -137.5000      15.8        63       133        60
OIR    2025130    131400   -8.2300 -137.5100      15.9        63       133        60
OIR    2025130    131400   -8.2300 -137.5200      16.0        63       133        60
OIR    2025130    131400   -8.2300 -137.5300      16.1        63       133        60
OIR    2025130    131400   -8.2300 -137.5400      16.0        63       132        60
OIR    2025130    131400   -8.2300 -137.5500      16.1        63       130        60
OIR    2025130    131400   -8.2300 -137.5600      16.1        62       128        60
OIR    2025130    131400   -8.2300 -137.5700      16.3        62       127        60
OIR    2025130    131400   -8.2300 -137.5800      16.5        62       126        60
OIR    2025130    131400   -8.2300 -137.5900      16.7        61       125        60
OIR    2025130    131400   -8.2300 -137.6000      16.8        61       125        60
OIR    2025130    131400   -8.2300 -137.6100      17.1        60       128        60
OIR    2025130    131400   -8.2300 -137.6200      17.3        60       128        60
OIR    2025130    131400   -8.2300 -137.6300      17.5        59       126        60
OIR    2025130    131400   -8.2300 -137.6400      17.6        59       124        60
OIR    2025130    131400   -8.2300 -137.6500      17.7        59       123        60
OIR    2025130    131400   -8.2300 -137.6600      17.8        59       122        60
OIR    2025130    131400   -8.2300 -137.6700      18.0        58       122        60
OIR    2025130    131400   -8.2300 -137.6800      18.1        57       122        60
OIR    2025130    131400   -8.2300 -137.6900      18.2        57       122        60
OIR    2025130    131400   -8.2300 -137.7000      18.2        56       121        60
OIR    2025130    131400   -8.2300 -137.7100      18.2        55       120        60
OIR    2025130    131400   -8.2300 -137.7200      18.3        54       116        60
OIR    2025130    131400   -8.2300 -137.7300      18.2        54       114        60
OIR    2025130    131400   -8.2300 -137.7400      18.2        53       112        60
OIR    2025130    131400   -8.2300 -137.7500      18.1        53       110        60
OIR    2025130    131400   -8.2300 -137.7600      18.1        52       111        60
OIR    2025130    131400   -8.2300 -137.7700      17.9        52       108        60
OIR    2025130    131400   -8.2300 -137.7800      17.4        48       104        60
OIR    2025130    131400   -8.2300 -137.7900      16.7        39       104        60
OIR    2025130    131400   -8.2300 -137.8000      16.7        31       103        60
OIR    2025130    131400   -8.2300 -137.8100      17.2        27       103        60
OIR    2025130    131400   -8.2300 -137.8200      18.2        24       104        60
OIR    2025130    131400   -8.2300 -137.8300      19.8        19       104        60
OIR    2025130    131400   -8.2300 -137.8400      20.8        14       104        60
OIR    2025130    131400   -8.2300 -137.8500      21.1        12       103        60
OIR    2025130    131400   -8.2300 -137.8600      21.1        11       103        60
OIR    2025130    131400   -8.2300 -137.8700      21.2        11       103        60
OIR    2025130    131400   -8.2300 -137.8800      21.3         9       103        60
OIR    2025130    131400   -8.2300 -137.8900      21.4         4       103        60
OIR    2025130    131400   -8.2300 -137.9000      21.8       358       104        60
OIR    2025130    131400   -8.2300 -137.9100      22.9       352       104        60
OIR    2025130    131400   -8.2300 -137.9200      25.5       343       107        60
OIR    2025130    131400   -8.2300 -137.9300      30.6       331       112        60
OIR    2025130    131400   -8.2300 -137.9400      31.5       331       124        60
OIR    2025130    131400   -8.2300 -137.9500      32.1       330       135        60
OIR    2025130    131400   -8.2300 -137.9600      33.5       331       146        60
OIR    2025130    131400   -8.2400 -137.4000      10.4        60       144        60
OIR    2025130    131400   -8.2400 -137.4100      10.4        59       137        60
OIR    2025130    131400   -8.2400 -137.4200      11.1        59       133        60
OIR    2025130    131400   -8.2400 -137.4300      13.9        61       132        60
OIR    2025130    131400   -8.2400 -137.4400      15.0        62       132        60
OIR    2025130    131400   -8.2400 -137.4500      15.3        62       132        60
OIR    2025130    131400   -8.2400 -137.4600      15.5        62       133        60
OIR    2025130    131400   -8.2400 -137.4700      15.6        63       133        60
OIR    2025130    131400   -8.2400 -137.4800      15.6        63       132        60
OIR    2025130    131400   -8.2400 -137.4900      15.7        63       132        60
OIR    2025130    131400   -8.2400 -137.5000      15.7        63       132        60
OIR    2025130    131400   -8.2400 -137.5100      15.8        63       132        60
OIR    2025130    131400   -8.2400 -137.5200      15.9        63       132        60
OIR    2025130    131400   -8.2400 -137.5300      15.9        63       132        60
OIR    2025130    131400   -8.2400 -137.5400      15.9        63       132        60
OIR    2025130    131400   -8.2400 -137.5500      15.9        62       130        60
OIR    2025130    131400   -8.2400 -137.5600      16.0        62       128        60
OIR    2025130    131400   -8.2400 -137.5700      16.1        62       127        60
OIR    2025130    131400   -8.2400 -137.5800      16.2        62       126        60
OIR    2025130    131400   -8.2400 -137.5900      16.4        62       125        60
OIR    2025130    131400   -8.2400 -137.6000      16.6        61       126        60
OIR    2025130    131400   -8.2400 -137.6100      16.8        61       128        60
OIR    2025130    131400   -8.2400 -137.6200      17.1        60       128        60
OIR    2025130    131400   -8.2400 -137.6300      17.3        60       126        60
OIR    2025130    131400   -8.2400 -137.6400      17.5        59       124        60
OIR    2025130    131400   -8.2400 -137.6500      17.6        59       123        60
OIR    2025130    131400   -8.2400 -137.6600      17.7        59       122        60
OIR    2025130    131400   -8.2400 -137.6700      17.8        58       122        60
OIR    2025130    131400   -8.2400 -137.6800      17.9        57       122        60
OIR    2025130    131400   -8.2400 -137.6900      18.0        57       123        60
OIR    2025130    131400   -8.2400 -137.7000      18.0        56       122        60
OIR    2025130    131400   -8.2400 -137.7100      18.1        55       121        60
OIR    2025130    131400   -8.2400 -137.7200      18.2        54       117        60
OIR    2025130    131400   -8.2400 -137.7300      18.2        54       115        60
OIR    2025130    131400   -8.2400 -137.7400      18.1        53       112        60
OIR    2025130    131400   -8.2400 -137.7500      18.1        53       111        60
OIR    2025130    131400   -8.2400 -137.7600      18.0        52       111        60
OIR    2025130    131400   -8.2400 -137.7700      17.9        51       109        60
OIR    2025130    131400   -8.2400 -137.7800      17.5        48       108        60
OIR    2025130    131400   -8.2400 -137.7900      16.7        40       108        60
OIR    2025130    131400   -8.2400 -137.8000      16.8        33       107        60
OIR    2025130    131400   -8.2400 -137.8100      17.1        29       107        60
OIR    2025130    131400   -8.2400 -137.8200      17.7        26       105        60
OIR    2025130    131400   -8.2400 -137.8300      19.3        21       104        60
OIR    2025130    131400   -8.2400 -137.8400      20.5        15       104        60
OIR    2025130    131400   -8.2400 -137.8500      21.0        13       105        60
OIR    2025130    131400   -8.2400 -137.8600      21.1        12       105        60
OIR    2025130    131400   -8.2400 -137.8700      21.2        11       107        60
OIR    2025130    131400   -8.2400 -137.8800      21.3        10       107        60
OIR    2025130    131400   -8.2400 -137.8900      21.5         6       107        60
OIR    2025130    131400   -8.2400 -137.9000      21.9         2       105        60
OIR    2025130    131400   -8.2400 -137.9100      22.5       357       108        60
OIR    2025130    131400   -8.2400 -137.9200      23.7       351       112        60
OIR    2025130    131400   -8.2400 -137.9300      26.7       338       116        60
OIR    2025130    131400   -8.2400 -137.9400      30.6       333       126        60
OIR    2025130    131400   -8.2400 -137.9500      30.7       330       135        60
OIR    2025130    131400   -8.2400 -137.9600      30.9       331       144        60
OIR    2025130    131400   -8.2500 -137.4000      10.0        58       145        60
OIR    2025130    131400   -8.2500 -137.4100      10.0        58       135        60
OIR    2025130    131400   -8.2500 -137.4200      11.2        59       129        60
OIR    2025130    131400   -8.2500 -137.4300      14.3        62       130        60
OIR    2025130    131400   -8.2500 -137.4400      15.1        62       131        60
OIR    2025130    131400   -8.2500 -137.4500      15.4        62       133        60
OIR    2025130    131400   -8.2500 -137.4600      15.5        62       132        60
OIR    2025130    131400   -8.2500 -137.4700      15.6        62       132        60
OIR    2025130    131400   -8.2500 -137.4800      15.6        62       131        60
OIR    2025130    131400   -8.2500 -137.4900      15.6        62       131        60
OIR    2025130    131400   -8.2500 -137.5000      15.7        63       130        60
OIR    2025130    131400   -8.2500 -137.5100      15.7        62       131        60
OIR    2025130    131400   -8.2500 -137.5200      15.8        62       131        60
OIR    2025130    131400   -8.2500 -137.5300      15.8        62       132        60
OIR    2025130    131400   -8.2500 -137.5400      15.8        62       132        60
OIR    2025130    131400   -8.2500 -137.5500      15.8        62       130        60
OIR    2025130    131400   -8.2500 -137.5600      15.9        62       127        60
OIR    2025130    131400   -8.2500 -137.5700      16.0        62       127        60
OIR    2025130    131400   -8.2500 -137.5800      16.0        62       126        60
OIR    2025130    131400   -8.2500 -137.5900      16.2        62       126        60
OIR    2025130    131400   -8.2500 -137.6000      16.3        61       126        60
OIR    2025130    131400   -8.2500 -137.6100      16.6        61       127        60
OIR    2025130    131400   -8.2500 -137.6200      16.8        60       127        60
OIR    2025130    131400   -8.2500 -137.6300      17.0        60       125        60
OIR    2025130    131400   -8.2500 -137.6400      17.2        59       124        60
OIR    2025130    131400   -8.2500 -137.6500      17.4        59       123        60
OIR    2025130    131400   -8.2500 -137.6600      17.5        59       122        60
OIR    2025130    131400   -8.2500 -137.6700      17.6        58       122        60
OIR    2025130    131400   -8.2500 -137.6800      17.7        57       123        60
OIR    2025130    131400   -8.2500 -137.6900      17.8        57       124        60
OIR    2025130    131400   -8.2500 -137.7000      17.9        56       124        60
OIR    2025130    131400   -8.2500 -137.7100      18.0        55       123        60
OIR    2025130    131400   -8.2500 -137.7200      18.1        54       120        60
OIR    2025130    131400   -8.2500 -137.7300      18.1        53       116        60
OIR    2025130    131400   -8.2500 -137.7400      18.1        53       114        60
OIR    2025130    131400   -8.2500 -137.7500      18.0        53       112        60
OIR    2025130    131400   -8.2500 -137.7600      18.0        52       110        60
OIR    2025130    131400   -8.2500 -137.7700      17.8        51       111        60
OIR    2025130    131400   -8.2500 -137.7800      17.4        48       112        60
OIR    2025130    131400   -8.2500 -137.7900      16.9        42       112        60
OIR    2025130    131400   -8.2500 -137.8000      16.7        36       111        60
OIR    2025130    131400   -8.2500 -137.8100      17.1        31       110        60
OIR    2025130    131400   -8.2500 -137.8200      17.5        28       109        60
OIR    2025130    131400   -8.2500 -137.8300      18.7        22       105        60
OIR    2025130    131400   -8.2500 -137.8400      20.1        17       107        60
OIR    2025130    131400   -8.2500 -137.8500      20.8        14       109        60
OIR    2025130    131400   -8.2500 -137.8600      21.0        12       110        60
OIR    2025130    131400   -8.2500 -137.8700      21.0        12       111        60
OIR    2025130    131400   -8.2500 -137.8800      21.1        11       111        60
OIR    2025130    131400   -8.2500 -137.8900      21.2         8       111        60
OIR    2025130    131400   -8.2500 -137.9000      21.4         5       110        60
OIR    2025130    131400   -8.2500 -137.9100      21.7         1       112        60
OIR    2025130    131400   -8.2500 -137.9200      22.3       357       116        60
OIR    2025130    131400   -8.2500 -137.9300      23.4       350       122        60
OIR    2025130    131400   -8.2500 -137.9400      24.2       340       128        60
OIR    2025130    131400   -8.2500 -137.9500      22.7       335       135        60
OIR    2025130    131400   -8.2500 -137.9600      21.3       333       142        60
OIR    2025130    131400   -8.2600 -137.4000       9.7        58       147        60
OIR    2025130    131400   -8.2600 -137.4100       9.6        57       136        60
OIR    2025130    131400   -8.2600 -137.4200      11.1        59       130        60
OIR    2025130    131400   -8.2600 -137.4300      14.6        62       130        60
OIR    2025130    131400   -8.2600 -137.4400      15.3        62       131        60
OIR    2025130    131400   -8.2600 -137.4500      15.5        62       132        60
OIR    2025130    131400   -8.2600 -137.4600      15.6        62       132        60
OIR    2025130    131400   -8.2600 -137.4700      15.6        62       132        60
OIR    2025130    131400   -8.2600 -137.4800      15.6        62       132        60
OIR    2025130    131400   -8.2600 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.2600 -137.5000      15.7        62       133        60
OIR    2025130    131400   -8.2600 -137.5100      15.7        62       132        60
OIR    2025130    131400   -8.2600 -137.5200      15.7        62       131        60
OIR    2025130    131400   -8.2600 -137.5300      15.7        62       131        60
OIR    2025130    131400   -8.2600 -137.5400      15.8        62       131        60
OIR    2025130    131400   -8.2600 -137.5500      15.8        62       129        60
OIR    2025130    131400   -8.2600 -137.5600      15.8        62       127        60
OIR    2025130    131400   -8.2600 -137.5700      15.9        62       127        60
OIR    2025130    131400   -8.2600 -137.5800      15.9        62       128        60
OIR    2025130    131400   -8.2600 -137.5900      16.0        62       128        60
OIR    2025130    131400   -8.2600 -137.6000      16.1        62       128        60
OIR    2025130    131400   -8.2600 -137.6100      16.3        61       127        60
OIR    2025130    131400   -8.2600 -137.6200      16.5        61       127        60
OIR    2025130    131400   -8.2600 -137.6300      16.7        60       127        60
OIR    2025130    131400   -8.2600 -137.6400      16.9        60       126        60
OIR    2025130    131400   -8.2600 -137.6500      17.1        59       124        60
OIR    2025130    131400   -8.2600 -137.6600      17.3        59       123        60
OIR    2025130    131400   -8.2600 -137.6700      17.4        58       123        60
OIR    2025130    131400   -8.2600 -137.6800      17.5        58       123        60
OIR    2025130    131400   -8.2600 -137.6900      17.6        57       123        60
OIR    2025130    131400   -8.2600 -137.7000      17.8        56       124        60
OIR    2025130    131400   -8.2600 -137.7100      17.9        55       124        60
OIR    2025130    131400   -8.2600 -137.7200      18.0        54       123        60
OIR    2025130    131400   -8.2600 -137.7300      18.0        53       120        60
OIR    2025130    131400   -8.2600 -137.7400      18.0        53       117        60
OIR    2025130    131400   -8.2600 -137.7500      18.0        52       115        60
OIR    2025130    131400   -8.2600 -137.7600      17.9        52       111        60
OIR    2025130    131400   -8.2600 -137.7700      17.8        51       111        60
OIR    2025130    131400   -8.2600 -137.7800      17.4        49       111        60
OIR    2025130    131400   -8.2600 -137.7900      17.0        45       112        60
OIR    2025130    131400   -8.2600 -137.8000      16.9        39       111        60
OIR    2025130    131400   -8.2600 -137.8100      17.2        32       109        60
OIR    2025130    131400   -8.2600 -137.8200      17.6        28       108        60
OIR    2025130    131400   -8.2600 -137.8300      18.3        24       108        60
OIR    2025130    131400   -8.2600 -137.8400      19.4        19       109        60
OIR    2025130    131400   -8.2600 -137.8500      20.3        15       109        60
OIR    2025130    131400   -8.2600 -137.8600      20.7        14       111        60
OIR    2025130    131400   -8.2600 -137.8700      20.8        13       112        60
OIR    2025130    131400   -8.2600 -137.8800      20.8        12       114        60
OIR    2025130    131400   -8.2600 -137.8900      20.6        10       116        60
OIR    2025130    131400   -8.2600 -137.9000      20.4         8       116        60
OIR    2025130    131400   -8.2600 -137.9100      20.0         4       120        60
OIR    2025130    131400   -8.2600 -137.9200      19.7       359       123        60
OIR    2025130    131400   -8.2600 -137.9300      19.6       353       126        60
OIR    2025130    131400   -8.2600 -137.9400      19.4       345       131        60
OIR    2025130    131400   -8.2600 -137.9500      19.0       339       140        60
OIR    2025130    131400   -8.2700 -137.4100       9.2        58       137        60
OIR    2025130    131400   -8.2700 -137.4200      11.5        59       131        60
OIR    2025130    131400   -8.2700 -137.4300      14.9        62       130        60
OIR    2025130    131400   -8.2700 -137.4400      15.5        62       131        60
OIR    2025130    131400   -8.2700 -137.4500      15.5        62       132        60
OIR    2025130    131400   -8.2700 -137.4600      15.6        62       132        60
OIR    2025130    131400   -8.2700 -137.4700      15.6        62       132        60
OIR    2025130    131400   -8.2700 -137.4800      15.6        62       132        60
OIR    2025130    131400   -8.2700 -137.4900      15.6        62       133        60
OIR    2025130    131400   -8.2700 -137.5000      15.7        62       135        60
OIR    2025130    131400   -8.2700 -137.5100      15.7        62       134        60
OIR    2025130    131400   -8.2700 -137.5200      15.7        62       132        60
OIR    2025130    131400   -8.2700 -137.5300      15.7        62       130        60
OIR    2025130    131400   -8.2700 -137.5400      15.7        62       131        60
OIR    2025130    131400   -8.2700 -137.5500      15.7        62       129        60
OIR    2025130    131400   -8.2700 -137.5600      15.8        62       127        60
OIR    2025130    131400   -8.2700 -137.5700      15.8        62       128        60
OIR    2025130    131400   -8.2700 -137.5800      15.8        62       129        60
OIR    2025130    131400   -8.2700 -137.5900      15.9        62       130        60
OIR    2025130    131400   -8.2700 -137.6000      16.0        62       129        60
OIR    2025130    131400   -8.2700 -137.6100      16.1        61       127        60
OIR    2025130    131400   -8.2700 -137.6200      16.2        61       127        60
OIR    2025130    131400   -8.2700 -137.6300      16.4        61       129        60
OIR    2025130    131400   -8.2700 -137.6400      16.6        60       128        60
OIR    2025130    131400   -8.2700 -137.6500      16.7        60       126        60
OIR    2025130    131400   -8.2700 -137.6600      16.9        59       125        60
OIR    2025130    131400   -8.2700 -137.6700      17.1        58       123        60
OIR    2025130    131400   -8.2700 -137.6800      17.2        58       123        60
OIR    2025130    131400   -8.2700 -137.6900      17.4        57       123        60
OIR    2025130    131400   -8.2700 -137.7000      17.5        56       123        60
OIR    2025130    131400   -8.2700 -137.7100      17.7        55       124        60
OIR    2025130    131400   -8.2700 -137.7200      17.9        54       125        60
OIR    2025130    131400   -8.2700 -137.7300      17.9        53       123        60
OIR    2025130    131400   -8.2700 -137.7400      17.9        53       120        60
OIR    2025130    131400   -8.2700 -137.7500      17.8        52       116        60
OIR    2025130    131400   -8.2700 -137.7600      17.8        52       113        60
OIR    2025130    131400   -8.2700 -137.7700      17.7        52       112        60
OIR    2025130    131400   -8.2700 -137.7800      17.3        50       112        60
OIR    2025130    131400   -8.2700 -137.7900      17.0        47       112        60
OIR    2025130    131400   -8.2700 -137.8000      17.1        42       111        60
OIR    2025130    131400   -8.2700 -137.8100      17.5        33       110        60
OIR    2025130    131400   -8.2700 -137.8200      17.9        29       109        60
OIR    2025130    131400   -8.2700 -137.8300      18.4        25       110        60
OIR    2025130    131400   -8.2700 -137.8400      19.0        21       111        60
OIR    2025130    131400   -8.2700 -137.8500      19.8        17       110        60
OIR    2025130    131400   -8.2700 -137.8600      20.2        15       112        60
OIR    2025130    131400   -8.2700 -137.8700      20.3        15       114        60
OIR    2025130    131400   -8.2700 -137.8800      20.3        14       116        60
OIR    2025130    131400   -8.2700 -137.8900      20.0        12       120        60
OIR    2025130    131400   -8.2700 -137.9000      19.4        10       124        60
OIR    2025130    131400   -8.2700 -137.9100      18.3         7       127        60
OIR    2025130    131400   -8.2700 -137.9200      17.3         1       129        60
OIR    2025130    131400   -8.2700 -137.9300      17.3       354       132        60
OIR    2025130    131400   -8.2700 -137.9400      17.1       350       136        60
OIR    2025130    131400   -8.2700 -137.9500      18.1       342       145        60
OIR    2025130    131400   -8.2800 -137.4100      10.3        61       136        60
OIR    2025130    131400   -8.2800 -137.4200      12.6        61       130        60
OIR    2025130    131400   -8.2800 -137.4300      15.2        62       131        60
OIR    2025130    131400   -8.2800 -137.4400      15.5        62       132        60
OIR    2025130    131400   -8.2800 -137.4500      15.6        62       132        60
OIR    2025130    131400   -8.2800 -137.4600      15.6        62       132        60
OIR    2025130    131400   -8.2800 -137.4700      15.6        62       132        60
OIR    2025130    131400   -8.2800 -137.4800      15.6        62       132        60
OIR    2025130    131400   -8.2800 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.2800 -137.5000      15.6        62       135        60
OIR    2025130    131400   -8.2800 -137.5100      15.7        62       135        60
OIR    2025130    131400   -8.2800 -137.5200      15.7        62       134        60
OIR    2025130    131400   -8.2800 -137.5300      15.7        62       133        60
OIR    2025130    131400   -8.2800 -137.5400      15.7        62       132        60
OIR    2025130    131400   -8.2800 -137.5500      15.7        62       130        60
OIR    2025130    131400   -8.2800 -137.5600      15.7        62       128        60
OIR    2025130    131400   -8.2800 -137.5700      15.8        62       129        60
OIR    2025130    131400   -8.2800 -137.5800      15.8        62       130        60
OIR    2025130    131400   -8.2800 -137.5900      15.8        62       129        60
OIR    2025130    131400   -8.2800 -137.6000      15.9        62       128        60
OIR    2025130    131400   -8.2800 -137.6100      15.9        61       127        60
OIR    2025130    131400   -8.2800 -137.6200      16.0        61       127        60
OIR    2025130    131400   -8.2800 -137.6300      16.2        61       127        60
OIR    2025130    131400   -8.2800 -137.6400      16.3        60       128        60
OIR    2025130    131400   -8.2800 -137.6500      16.4        60       128        60
OIR    2025130    131400   -8.2800 -137.6600      16.5        60       126        60
OIR    2025130    131400   -8.2800 -137.6700      16.7        59       123        60
OIR    2025130    131400   -8.2800 -137.6800      16.9        58       123        60
OIR    2025130    131400   -8.2800 -137.6900      17.1        57       124        60
OIR    2025130    131400   -8.2800 -137.7000      17.2        57       122        60
OIR    2025130    131400   -8.2800 -137.7100      17.4        56       121        60
OIR    2025130    131400   -8.2800 -137.7200      17.6        55       123        60
OIR    2025130    131400   -8.2800 -137.7300      17.8        54       122        60
OIR    2025130    131400   -8.2800 -137.7400      17.8        53       120        60
OIR    2025130    131400   -8.2800 -137.7500      17.7        52       117        60
OIR    2025130    131400   -8.2800 -137.7600      17.7        52       116        60
OIR    2025130    131400   -8.2800 -137.7700      17.6        52       115        60
OIR    2025130    131400   -8.2800 -137.7800      17.5        51       114        60
OIR    2025130    131400   -8.2800 -137.7900      17.3        49       115        60
OIR    2025130    131400   -8.2800 -137.8000      17.4        44       115        60
OIR    2025130    131400   -8.2800 -137.8100      17.9        35       114        60
OIR    2025130    131400   -8.2800 -137.8200      18.4        30       113        60
OIR    2025130    131400   -8.2800 -137.8300      18.9        26       111        60
OIR    2025130    131400   -8.2800 -137.8400      19.6        22       111        60
OIR    2025130    131400   -8.2800 -137.8500      20.2        18       112        60
OIR    2025130    131400   -8.2800 -137.8600      20.2        16       114        60
OIR    2025130    131400   -8.2800 -137.8700      20.2        15       116        60
OIR    2025130    131400   -8.2800 -137.8800      20.1        15       117        60
OIR    2025130    131400   -8.2800 -137.8900      19.6        13       122        60
OIR    2025130    131400   -8.2800 -137.9000      18.7        12       127        60
OIR    2025130    131400   -8.2800 -137.9100      17.5         9       132        60
OIR    2025130    131400   -8.2800 -137.9200      16.5         3       137        60
OIR    2025130    131400   -8.2800 -137.9300      16.8       358       142        60
OIR    2025130    131400   -8.2800 -137.9400      17.4       355       147        60
OIR    2025130    131400   -8.2900 -136.4300      11.6       130       138        60
OIR    2025130    131400   -8.2900 -137.4100      12.5        64       136        60
OIR    2025130    131400   -8.2900 -137.4200      14.3        62       130        60
OIR    2025130    131400   -8.2900 -137.4300      15.4        62       132        60
OIR    2025130    131400   -8.2900 -137.4400      15.6        62       133        60
OIR    2025130    131400   -8.2900 -137.4500      15.6        62       133        60
OIR    2025130    131400   -8.2900 -137.4600      15.6        62       133        60
OIR    2025130    131400   -8.2900 -137.4700      15.6        62       133        60
OIR    2025130    131400   -8.2900 -137.4800      15.6        62       132        60
OIR    2025130    131400   -8.2900 -137.4900      15.6        62       133        60
OIR    2025130    131400   -8.2900 -137.5000      15.6        62       135        60
OIR    2025130    131400   -8.2900 -137.5100      15.6        62       135        60
OIR    2025130    131400   -8.2900 -137.5200      15.7        62       135        60
OIR    2025130    131400   -8.2900 -137.5300      15.7        62       135        60
OIR    2025130    131400   -8.2900 -137.5400      15.7        62       133        60
OIR    2025130    131400   -8.2900 -137.5500      15.7        62       132        60
OIR    2025130    131400   -8.2900 -137.5600      15.7        62       130        60
OIR    2025130    131400   -8.2900 -137.5700      15.7        62       130        60
OIR    2025130    131400   -8.2900 -137.5800      15.8        62       130        60
OIR    2025130    131400   -8.2900 -137.5900      15.8        62       128        60
OIR    2025130    131400   -8.2900 -137.6000      15.8        62       127        60
OIR    2025130    131400   -8.2900 -137.6100      15.9        61       128        60
OIR    2025130    131400   -8.2900 -137.6200      15.9        61       127        60
OIR    2025130    131400   -8.2900 -137.6300      16.0        61       127        60
OIR    2025130    131400   -8.2900 -137.6400      16.0        61       128        60
OIR    2025130    131400   -8.2900 -137.6500      16.1        61       129        60
OIR    2025130    131400   -8.2900 -137.6600      16.2        60       126        60
OIR    2025130    131400   -8.2900 -137.6700      16.4        60       123        60
OIR    2025130    131400   -8.2900 -137.6800      16.5        59       124        60
OIR    2025130    131400   -8.2900 -137.6900      16.7        58       124        60
OIR    2025130    131400   -8.2900 -137.7000      16.9        57       122        60
OIR    2025130    131400   -8.2900 -137.7100      17.0        56       120        60
OIR    2025130    131400   -8.2900 -137.7200      17.3        55       122        60
OIR    2025130    131400   -8.2900 -137.7300      17.5        54       122        60
OIR    2025130    131400   -8.2900 -137.7400      17.7        53       121        60
OIR    2025130    131400   -8.2900 -137.7500      17.7        52       120        60
OIR    2025130    131400   -8.2900 -137.7600      17.6        52       119        60
OIR    2025130    131400   -8.2900 -137.7700      17.5        52       117        60
OIR    2025130    131400   -8.2900 -137.7800      17.5        51       116        60
OIR    2025130    131400   -8.2900 -137.7900      17.4        50       116        60
OIR    2025130    131400   -8.2900 -137.8000      17.7        45       117        60
OIR    2025130    131400   -8.2900 -137.8100      18.7        37       117        60
OIR    2025130    131400   -8.2900 -137.8200      19.1        32       116        60
OIR    2025130    131400   -8.2900 -137.8300      19.7        26       113        60
OIR    2025130    131400   -8.2900 -137.8400      20.2        22       113        60
OIR    2025130    131400   -8.2900 -137.8500      20.8        19       115        60
OIR    2025130    131400   -8.2900 -137.8600      20.9        17       116        60
OIR    2025130    131400   -8.2900 -137.8700      20.7        15       117        60
OIR    2025130    131400   -8.2900 -137.8800      20.5        14       121        60
OIR    2025130    131400   -8.2900 -137.8900      20.0        12       125        60
OIR    2025130    131400   -8.2900 -137.9000      19.2        10       130        60
OIR    2025130    131400   -8.2900 -137.9100      18.1         7       137        60
OIR    2025130    131400   -8.2900 -137.9200      17.3         2       145        60
OIR    2025130    131400   -8.3000 -137.4100      14.1        62       136        60
OIR    2025130    131400   -8.3000 -137.4200      15.3        62       130        60
OIR    2025130    131400   -8.3000 -137.4300      15.6        62       135        60
OIR    2025130    131400   -8.3000 -137.4400      15.6        62       135        60
OIR    2025130    131400   -8.3000 -137.4500      15.6        62       133        60
OIR    2025130    131400   -8.3000 -137.4600      15.6        62       133        60
OIR    2025130    131400   -8.3000 -137.4700      15.6        62       133        60
OIR    2025130    131400   -8.3000 -137.4800      15.6        62       134        60
OIR    2025130    131400   -8.3000 -137.4900      15.6        62       135        60
OIR    2025130    131400   -8.3000 -137.5000      15.6        62       134        60
OIR    2025130    131400   -8.3000 -137.5100      15.6        62       134        60
OIR    2025130    131400   -8.3000 -137.5200      15.7        62       134        60
OIR    2025130    131400   -8.3000 -137.5300      15.7        62       134        60
OIR    2025130    131400   -8.3000 -137.5400      15.7        62       133        60
OIR    2025130    131400   -8.3000 -137.5500      15.7        62       133        60
OIR    2025130    131400   -8.3000 -137.5600      15.7        62       134        60
OIR    2025130    131400   -8.3000 -137.5700      15.7        62       132        60
OIR    2025130    131400   -8.3000 -137.5800      15.7        62       131        60
OIR    2025130    131400   -8.3000 -137.5900      15.7        62       129        60
OIR    2025130    131400   -8.3000 -137.6000      15.8        62       128        60
OIR    2025130    131400   -8.3000 -137.6100      15.8        61       129        60
OIR    2025130    131400   -8.3000 -137.6200      15.8        61       129        60
OIR    2025130    131400   -8.3000 -137.6300      15.9        61       129        60
OIR    2025130    131400   -8.3000 -137.6400      15.9        61       128        60
OIR    2025130    131400   -8.3000 -137.6500      16.0        61       127        60
OIR    2025130    131400   -8.3000 -137.6600      16.0        60       126        60
OIR    2025130    131400   -8.3000 -137.6700      16.1        60       126        60
OIR    2025130    131400   -8.3000 -137.6800      16.2        59       125        60
OIR    2025130    131400   -8.3000 -137.6900      16.4        59       125        60
OIR    2025130    131400   -8.3000 -137.7000      16.5        58       124        60
OIR    2025130    131400   -8.3000 -137.7100      16.7        57       124        60
OIR    2025130    131400   -8.3000 -137.7200      16.9        56       124        60
OIR    2025130    131400   -8.3000 -137.7300      17.1        54       124        60
OIR    2025130    131400   -8.3000 -137.7400      17.4        53       123        60
OIR    2025130    131400   -8.3000 -137.7500      17.5        52       123        60
OIR    2025130    131400   -8.3000 -137.7600      17.5        52       122        60
OIR    2025130    131400   -8.3000 -137.7700      17.5        51       121        60
OIR    2025130    131400   -8.3000 -137.7800      17.5        51       120        60
OIR    2025130    131400   -8.3000 -137.7900      17.6        50       119        60
OIR    2025130    131400   -8.3000 -137.8000      18.0        46       119        60
OIR    2025130    131400   -8.3000 -137.8100      19.0        39       120        60
OIR    2025130    131400   -8.3000 -137.8200      19.8        34       121        60
OIR    2025130    131400   -8.3000 -137.8300      20.5        28       119        60
OIR    2025130    131400   -8.3000 -137.8400      21.5        21       119        60
OIR    2025130    131400   -8.3000 -137.8500      21.9        19       120        60
OIR    2025130    131400   -8.3000 -137.8600      22.0        17       121        60
OIR    2025130    131400   -8.3000 -137.8700      21.9        15       123        60
OIR    2025130    131400   -8.3000 -137.8800      21.6        13       127        60
OIR    2025130    131400   -8.3000 -137.8900      21.3        10       131        60
OIR    2025130    131400   -8.3000 -137.9000      21.2         8       136        60
OIR    2025130    131400   -8.3000 -137.9100      21.5         5       143        60
OIR    2025130    131400   -8.3100 -137.4100      14.5        61       136        60
OIR    2025130    131400   -8.3100 -137.4200      15.5        62       131        60
OIR    2025130    131400   -8.3100 -137.4300      15.6        62       136        60
OIR    2025130    131400   -8.3100 -137.4400      15.6        62       136        60
OIR    2025130    131400   -8.3100 -137.4500      15.6        62       134        60
OIR    2025130    131400   -8.3100 -137.4600      15.6        62       133        60
OIR    2025130    131400   -8.3100 -137.4700      15.6        62       132        60
OIR    2025130    131400   -8.3100 -137.4800      15.6        62       134        60
OIR    2025130    131400   -8.3100 -137.4900      15.6        62       135        60
OIR    2025130    131400   -8.3100 -137.5000      15.6        62       133        60
OIR    2025130    131400   -8.3100 -137.5100      15.6        62       133        60
OIR    2025130    131400   -8.3100 -137.5200      15.7        62       134        60
OIR    2025130    131400   -8.3100 -137.5300      15.7        62       133        60
OIR    2025130    131400   -8.3100 -137.5400      15.7        62       133        60
OIR    2025130    131400   -8.3100 -137.5500      15.7        62       133        60
OIR    2025130    131400   -8.3100 -137.5600      15.7        62       134        60
OIR    2025130    131400   -8.3100 -137.5700      15.7        62       133        60
OIR    2025130    131400   -8.3100 -137.5800      15.7        62       132        60
OIR    2025130    131400   -8.3100 -137.5900      15.7        62       129        60
OIR    2025130    131400   -8.3100 -137.6000      15.7        61       128        60
OIR    2025130    131400   -8.3100 -137.6100      15.7        61       130        60
OIR    2025130    131400   -8.3100 -137.6200      15.8        61       130        60
OIR    2025130    131400   -8.3100 -137.6300      15.8        61       129        60
OIR    2025130    131400   -8.3100 -137.6400      15.8        61       127        60
OIR    2025130    131400   -8.3100 -137.6500      15.9        61       126        60
OIR    2025130    131400   -8.3100 -137.6600      15.9        61       126        60
OIR    2025130    131400   -8.3100 -137.6700      16.0        60       127        60
OIR    2025130    131400   -8.3100 -137.6800      16.0        60       126        60
OIR    2025130    131400   -8.3100 -137.6900      16.1        59       126        60
OIR    2025130    131400   -8.3100 -137.7000      16.2        58       126        60
OIR    2025130    131400   -8.3100 -137.7100      16.4        57       126        60
OIR    2025130    131400   -8.3100 -137.7200      16.6        56       125        60
OIR    2025130    131400   -8.3100 -137.7300      16.8        55       125        60
OIR    2025130    131400   -8.3100 -137.7400      17.0        54       125        60
OIR    2025130    131400   -8.3100 -137.7500      17.3        53       124        60
OIR    2025130    131400   -8.3100 -137.7600      17.4        52       123        60
OIR    2025130    131400   -8.3100 -137.7700      17.4        52       122        60
OIR    2025130    131400   -8.3100 -137.7800      17.4        51       121        60
OIR    2025130    131400   -8.3100 -137.7900      17.5        51       121        60
OIR    2025130    131400   -8.3100 -137.8000      17.8        49       121        60
OIR    2025130    131400   -8.3100 -137.8100      19.0        41       123        60
OIR    2025130    131400   -8.3100 -137.8200      20.2        35       124        60
OIR    2025130    131400   -8.3100 -137.8300      21.2        29       125        60
OIR    2025130    131400   -8.3100 -137.8400      22.4        22       125        60
OIR    2025130    131400   -8.3100 -137.8500      22.7        20       125        60
OIR    2025130    131400   -8.3100 -137.8600      22.7        18       126        60
OIR    2025130    131400   -8.3100 -137.8700      22.5        16       127        60
OIR    2025130    131400   -8.3100 -137.8800      22.2        14       133        60
OIR    2025130    131400   -8.3100 -137.8900      22.0        11       139        60
OIR    2025130    131400   -8.3100 -137.9000      21.9         6       144        60
OIR    2025130    131400   -8.3200 -137.4100      14.2        60       137        60
OIR    2025130    131400   -8.3200 -137.4200      15.5        62       132        60
OIR    2025130    131400   -8.3200 -137.4300      15.6        62       136        60
OIR    2025130    131400   -8.3200 -137.4400      15.6        62       137        60
OIR    2025130    131400   -8.3200 -137.4500      15.6        62       137        60
OIR    2025130    131400   -8.3200 -137.4600      15.6        62       134        60
OIR    2025130    131400   -8.3200 -137.4700      15.6        62       130        60
OIR    2025130    131400   -8.3200 -137.4800      15.6        62       131        60
OIR    2025130    131400   -8.3200 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.3200 -137.5000      15.6        62       132        60
OIR    2025130    131400   -8.3200 -137.5100      15.6        62       132        60
OIR    2025130    131400   -8.3200 -137.5200      15.6        62       132        60
OIR    2025130    131400   -8.3200 -137.5300      15.7        62       133        60
OIR    2025130    131400   -8.3200 -137.5400      15.7        62       133        60
OIR    2025130    131400   -8.3200 -137.5500      15.7        62       132        60
OIR    2025130    131400   -8.3200 -137.5600      15.7        62       131        60
OIR    2025130    131400   -8.3200 -137.5700      15.7        62       133        60
OIR    2025130    131400   -8.3200 -137.5800      15.7        62       134        60
OIR    2025130    131400   -8.3200 -137.5900      15.7        61       130        60
OIR    2025130    131400   -8.3200 -137.6000      15.7        61       128        60
OIR    2025130    131400   -8.3200 -137.6100      15.7        61       129        60
OIR    2025130    131400   -8.3200 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3200 -137.6300      15.8        61       126        60
OIR    2025130    131400   -8.3200 -137.6400      15.8        61       126        60
OIR    2025130    131400   -8.3200 -137.6500      15.8        61       127        60
OIR    2025130    131400   -8.3200 -137.6600      15.8        61       127        60
OIR    2025130    131400   -8.3200 -137.6700      15.9        60       126        60
OIR    2025130    131400   -8.3200 -137.6800      15.9        60       127        60
OIR    2025130    131400   -8.3200 -137.6900      16.0        59       127        60
OIR    2025130    131400   -8.3200 -137.7000      16.0        59       127        60
OIR    2025130    131400   -8.3200 -137.7100      16.1        58       127        60
OIR    2025130    131400   -8.3200 -137.7200      16.2        57       126        60
OIR    2025130    131400   -8.3200 -137.7300      16.4        56       125        60
OIR    2025130    131400   -8.3200 -137.7400      16.7        55       125        60
OIR    2025130    131400   -8.3200 -137.7500      17.0        53       124        60
OIR    2025130    131400   -8.3200 -137.7600      17.2        52       124        60
OIR    2025130    131400   -8.3200 -137.7700      17.3        52       122        60
OIR    2025130    131400   -8.3200 -137.7800      17.3        51       120        60
OIR    2025130    131400   -8.3200 -137.7900      17.4        51       121        60
OIR    2025130    131400   -8.3200 -137.8000      17.7        50       122        60
OIR    2025130    131400   -8.3200 -137.8100      19.0        41       124        60
OIR    2025130    131400   -8.3200 -137.8200      20.4        34       126        60
OIR    2025130    131400   -8.3200 -137.8300      21.6        28       130        60
OIR    2025130    131400   -8.3200 -137.8400      22.7        22       132        60
OIR    2025130    131400   -8.3200 -137.8500      22.9        21       132        60
OIR    2025130    131400   -8.3200 -137.8600      22.8        20       131        60
OIR    2025130    131400   -8.3200 -137.8700      22.4        18       131        60
OIR    2025130    131400   -8.3200 -137.8800      21.9        16       140        60
OIR    2025130    131400   -8.3300 -137.4100      13.7        60       144        60
OIR    2025130    131400   -8.3300 -137.4200      15.5        62       138        60
OIR    2025130    131400   -8.3300 -137.4300      15.6        62       136        60
OIR    2025130    131400   -8.3300 -137.4400      15.6        62       136        60
OIR    2025130    131400   -8.3300 -137.4500      15.6        62       137        60
OIR    2025130    131400   -8.3300 -137.4600      15.6        62       134        60
OIR    2025130    131400   -8.3300 -137.4700      15.6        62       131        60
OIR    2025130    131400   -8.3300 -137.4800      15.6        62       131        60
OIR    2025130    131400   -8.3300 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.3300 -137.5000      15.6        62       133        60
OIR    2025130    131400   -8.3300 -137.5100      15.6        62       133        60
OIR    2025130    131400   -8.3300 -137.5200      15.6        62       133        60
OIR    2025130    131400   -8.3300 -137.5300      15.7        62       133        60
OIR    2025130    131400   -8.3300 -137.5400      15.7        62       132        60
OIR    2025130    131400   -8.3300 -137.5500      15.7        62       132        60
OIR    2025130    131400   -8.3300 -137.5600      15.7        62       132        60
OIR    2025130    131400   -8.3300 -137.5700      15.7        62       133        60
OIR    2025130    131400   -8.3300 -137.5800      15.7        62       134        60
OIR    2025130    131400   -8.3300 -137.5900      15.7        61       131        60
OIR    2025130    131400   -8.3300 -137.6000      15.7        61       128        60
OIR    2025130    131400   -8.3300 -137.6100      15.7        61       129        60
OIR    2025130    131400   -8.3300 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3300 -137.6300      15.7        61       125        60
OIR    2025130    131400   -8.3300 -137.6400      15.8        61       127        60
OIR    2025130    131400   -8.3300 -137.6500      15.8        61       129        60
OIR    2025130    131400   -8.3300 -137.6600      15.8        61       128        60
OIR    2025130    131400   -8.3300 -137.6700      15.8        60       127        60
OIR    2025130    131400   -8.3300 -137.6800      15.8        60       128        60
OIR    2025130    131400   -8.3300 -137.6900      15.8        60       128        60
OIR    2025130    131400   -8.3300 -137.7000      15.9        59       128        60
OIR    2025130    131400   -8.3300 -137.7100      15.9        58       128        60
OIR    2025130    131400   -8.3300 -137.7200      16.0        58       127        60
OIR    2025130    131400   -8.3300 -137.7300      16.1        57       126        60
OIR    2025130    131400   -8.3300 -137.7400      16.3        56       125        60
OIR    2025130    131400   -8.3300 -137.7500      16.6        54       126        60
OIR    2025130    131400   -8.3300 -137.7600      16.9        53       127        60
OIR    2025130    131400   -8.3300 -137.7700      17.1        52       125        60
OIR    2025130    131400   -8.3300 -137.7800      17.2        52       124        60
OIR    2025130    131400   -8.3300 -137.7900      17.3        51       125        60
OIR    2025130    131400   -8.3300 -137.8000      17.7        49       125        60
OIR    2025130    131400   -8.3300 -137.8100      19.1        39       126        60
OIR    2025130    131400   -8.3300 -137.8200      20.7        32       128        60
OIR    2025130    131400   -8.3300 -137.8300      22.1        26       132        60
OIR    2025130    131400   -8.3300 -137.8400      22.9        21       133        60
OIR    2025130    131400   -8.3300 -137.8500      22.9        21       133        60
OIR    2025130    131400   -8.3300 -137.8600      22.9        20       136        60
OIR    2025130    131400   -8.3300 -137.8700      22.2        19       139        60
OIR    2025130    131400   -8.3300 -137.8800      21.5        17       146        60
OIR    2025130    131400   -8.3400 -137.4200      15.4        62       145        60
OIR    2025130    131400   -8.3400 -137.4300      15.5        62       135        60
OIR    2025130    131400   -8.3400 -137.4400      15.6        62       135        60
OIR    2025130    131400   -8.3400 -137.4500      15.6        62       136        60
OIR    2025130    131400   -8.3400 -137.4600      15.6        62       134        60
OIR    2025130    131400   -8.3400 -137.4700      15.6        62       131        60
OIR    2025130    131400   -8.3400 -137.4800      15.6        62       131        60
OIR    2025130    131400   -8.3400 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.3400 -137.5000      15.6        62       134        60
OIR    2025130    131400   -8.3400 -137.5100      15.6        62       135        60
OIR    2025130    131400   -8.3400 -137.5200      15.6        62       134        60
OIR    2025130    131400   -8.3400 -137.5300      15.6        62       133        60
OIR    2025130    131400   -8.3400 -137.5400      15.7        62       132        60
OIR    2025130    131400   -8.3400 -137.5500      15.7        62       133        60
OIR    2025130    131400   -8.3400 -137.5600      15.7        62       134        60
OIR    2025130    131400   -8.3400 -137.5700      15.6        62       133        60
OIR    2025130    131400   -8.3400 -137.5800      15.6        61       133        60
OIR    2025130    131400   -8.3400 -137.5900      15.7        61       131        60
OIR    2025130    131400   -8.3400 -137.6000      15.7        61       129        60
OIR    2025130    131400   -8.3400 -137.6100      15.7        61       129        60
OIR    2025130    131400   -8.3400 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3400 -137.6300      15.7        61       126        60
OIR    2025130    131400   -8.3400 -137.6400      15.7        61       128        60
OIR    2025130    131400   -8.3400 -137.6500      15.8        61       130        60
OIR    2025130    131400   -8.3400 -137.6600      15.8        61       129        60
OIR    2025130    131400   -8.3400 -137.6700      15.8        60       129        60
OIR    2025130    131400   -8.3400 -137.6800      15.8        60       129        60
OIR    2025130    131400   -8.3400 -137.6900      15.8        60       129        60
OIR    2025130    131400   -8.3400 -137.7000      15.8        59       129        60
OIR    2025130    131400   -8.3400 -137.7100      15.8        59       129        60
OIR    2025130    131400   -8.3400 -137.7200      15.8        58       128        60
OIR    2025130    131400   -8.3400 -137.7300      15.9        58       127        60
OIR    2025130    131400   -8.3400 -137.7400      16.0        57       126        60
OIR    2025130    131400   -8.3400 -137.7500      16.2        56       128        60
OIR    2025130    131400   -8.3400 -137.7600      16.4        54       130        60
OIR    2025130    131400   -8.3400 -137.7700      16.8        53       130        60
OIR    2025130    131400   -8.3400 -137.7800      17.0        52       129        60
OIR    2025130    131400   -8.3400 -137.7900      17.2        51       129        60
OIR    2025130    131400   -8.3400 -137.8000      18.2        46       129        60
OIR    2025130    131400   -8.3400 -137.8100      20.4        34       129        60
OIR    2025130    131400   -8.3400 -137.8200      21.7        28       131        60
OIR    2025130    131400   -8.3400 -137.8300      22.8        23       134        60
OIR    2025130    131400   -8.3400 -137.8400      23.0        21       134        60
OIR    2025130    131400   -8.3400 -137.8500      23.0        21       133        60
OIR    2025130    131400   -8.3400 -137.8600      22.9        21       140        60
OIR    2025130    131400   -8.3400 -137.8700      21.8        18       148        60
OIR    2025130    131400   -8.3400 -139.2700      14.0         3       124        60
OIR    2025130    131400   -8.3400 -139.9400      15.2         8       142        60
OIR    2025130    131400   -8.3500 -137.4300      15.5        63       134        60
OIR    2025130    131400   -8.3500 -137.4400      15.6        62       134        60
OIR    2025130    131400   -8.3500 -137.4500      15.6        62       137        60
OIR    2025130    131400   -8.3500 -137.4600      15.6        62       135        60
OIR    2025130    131400   -8.3500 -137.4700      15.6        62       134        60
OIR    2025130    131400   -8.3500 -137.4800      15.6        62       132        60
OIR    2025130    131400   -8.3500 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.3500 -137.5000      15.6        62       133        60
OIR    2025130    131400   -8.3500 -137.5100      15.6        62       134        60
OIR    2025130    131400   -8.3500 -137.5200      15.6        62       133        60
OIR    2025130    131400   -8.3500 -137.5300      15.6        62       133        60
OIR    2025130    131400   -8.3500 -137.5400      15.7        62       133        60
OIR    2025130    131400   -8.3500 -137.5500      15.7        62       134        60
OIR    2025130    131400   -8.3500 -137.5600      15.7        62       135        60
OIR    2025130    131400   -8.3500 -137.5700      15.6        62       134        60
OIR    2025130    131400   -8.3500 -137.5800      15.6        61       133        60
OIR    2025130    131400   -8.3500 -137.5900      15.6        61       131        60
OIR    2025130    131400   -8.3500 -137.6000      15.6        61       129        60
OIR    2025130    131400   -8.3500 -137.6100      15.7        61       128        60
OIR    2025130    131400   -8.3500 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3500 -137.6300      15.7        61       127        60
OIR    2025130    131400   -8.3500 -137.6400      15.7        61       127        60
OIR    2025130    131400   -8.3500 -137.6500      15.7        61       127        60
OIR    2025130    131400   -8.3500 -137.6600      15.7        61       128        60
OIR    2025130    131400   -8.3500 -137.6700      15.7        60       128        60
OIR    2025130    131400   -8.3500 -137.6800      15.7        60       129        60
OIR    2025130    131400   -8.3500 -137.6900      15.7        60       129        60
OIR    2025130    131400   -8.3500 -137.7000      15.7        59       129        60
OIR    2025130    131400   -8.3500 -137.7100      15.7        59       129        60
OIR    2025130    131400   -8.3500 -137.7200      15.7        58       129        60
OIR    2025130    131400   -8.3500 -137.7300      15.8        58       128        60
OIR    2025130    131400   -8.3500 -137.7400      15.8        57       125        60
OIR    2025130    131400   -8.3500 -137.7500      15.9        57       127        60
OIR    2025130    131400   -8.3500 -137.7600      16.1        56       130        60
OIR    2025130    131400   -8.3500 -137.7700      16.3        54       129        60
OIR    2025130    131400   -8.3500 -137.7800      16.6        53       129        60
OIR    2025130    131400   -8.3500 -137.7900      16.9        51       128        60
OIR    2025130    131400   -8.3500 -137.8000      18.3        43       129        60
OIR    2025130    131400   -8.3500 -137.8100      20.7        32       129        60
OIR    2025130    131400   -8.3500 -137.8200      22.1        26       131        60
OIR    2025130    131400   -8.3500 -137.8300      22.8        23       134        60
OIR    2025130    131400   -8.3500 -137.8400      22.9        21       134        60
OIR    2025130    131400   -8.3500 -137.8500      22.9        21       134        60
OIR    2025130    131400   -8.3500 -137.8600      22.9        21       142        60
OIR    2025130    131400   -8.3600 -137.4300      15.0        63       132        60
OIR    2025130    131400   -8.3600 -137.4400      15.4        63       133        60
OIR    2025130    131400   -8.3600 -137.4500      15.6        62       138        60
OIR    2025130    131400   -8.3600 -137.4600      15.6        62       138        60
OIR    2025130    131400   -8.3600 -137.4700      15.6        62       137        60
OIR    2025130    131400   -8.3600 -137.4800      15.6        62       134        60
OIR    2025130    131400   -8.3600 -137.4900      15.6        62       131        60
OIR    2025130    131400   -8.3600 -137.5000      15.6        62       131        60
OIR    2025130    131400   -8.3600 -137.5100      15.6        62       132        60
OIR    2025130    131400   -8.3600 -137.5200      15.6        62       132        60
OIR    2025130    131400   -8.3600 -137.5300      15.6        62       133        60
OIR    2025130    131400   -8.3600 -137.5400      15.6        62       134        60
OIR    2025130    131400   -8.3600 -137.5500      15.7        62       135        60
OIR    2025130    131400   -8.3600 -137.5600      15.6        62       136        60
OIR    2025130    131400   -8.3600 -137.5700      15.6        61       135        60
OIR    2025130    131400   -8.3600 -137.5800      15.6        61       133        60
OIR    2025130    131400   -8.3600 -137.5900      15.6        61       131        60
OIR    2025130    131400   -8.3600 -137.6000      15.6        61       129        60
OIR    2025130    131400   -8.3600 -137.6100      15.7        61       128        60
OIR    2025130    131400   -8.3600 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3600 -137.6300      15.7        61       128        60
OIR    2025130    131400   -8.3600 -137.6400      15.7        61       126        60
OIR    2025130    131400   -8.3600 -137.6500      15.7        61       124        60
OIR    2025130    131400   -8.3600 -137.6600      15.7        61       126        60
OIR    2025130    131400   -8.3600 -137.6700      15.7        60       128        60
OIR    2025130    131400   -8.3600 -137.6800      15.7        60       128        60
OIR    2025130    131400   -8.3600 -137.6900      15.7        60       129        60
OIR    2025130    131400   -8.3600 -137.7000      15.7        59       130        60
OIR    2025130    131400   -8.3600 -137.7100      15.7        59       130        60
OIR    2025130    131400   -8.3600 -137.7200      15.7        59       130        60
OIR    2025130    131400   -8.3600 -137.7300      15.7        58       128        60
OIR    2025130    131400   -8.3600 -137.7400      15.7        58       125        60
OIR    2025130    131400   -8.3600 -137.7500      15.8        57       127        60
OIR    2025130    131400   -8.3600 -137.7600      15.9        56       128        60
OIR    2025130    131400   -8.3600 -137.7700      16.0        55       128        60
OIR    2025130    131400   -8.3600 -137.7800      16.2        53       127        60
OIR    2025130    131400   -8.3600 -137.7900      16.5        50       127        60
OIR    2025130    131400   -8.3600 -137.8000      18.1        39       128        60
OIR    2025130    131400   -8.3600 -137.8100      20.9        28       129        60
OIR    2025130    131400   -8.3600 -137.8200      22.5        23       130        60
OIR    2025130    131400   -8.3600 -137.8300      22.9        21       134        60
OIR    2025130    131400   -8.3600 -137.8400      23.0        21       135        60
OIR    2025130    131400   -8.3600 -137.8500      22.9        20       135        60
OIR    2025130    131400   -8.3600 -137.8600      22.8        20       144        60
OIR    2025130    131400   -8.3700 -137.4300      14.1        65       138        60
OIR    2025130    131400   -8.3700 -137.4400      14.8        64       135        60
OIR    2025130    131400   -8.3700 -137.4500      15.5        63       135        60
OIR    2025130    131400   -8.3700 -137.4600      15.6        62       136        60
OIR    2025130    131400   -8.3700 -137.4700      15.6        62       138        60
OIR    2025130    131400   -8.3700 -137.4800      15.6        62       134        60
OIR    2025130    131400   -8.3700 -137.4900      15.6        62       131        60
OIR    2025130    131400   -8.3700 -137.5000      15.6        62       132        60
OIR    2025130    131400   -8.3700 -137.5100      15.6        62       132        60
OIR    2025130    131400   -8.3700 -137.5200      15.6        62       132        60
OIR    2025130    131400   -8.3700 -137.5300      15.6        62       132        60
OIR    2025130    131400   -8.3700 -137.5400      15.6        62       131        60
OIR    2025130    131400   -8.3700 -137.5500      15.6        62       134        60
OIR    2025130    131400   -8.3700 -137.5600      15.7        62       136        60
OIR    2025130    131400   -8.3700 -137.5700      15.6        61       135        60
OIR    2025130    131400   -8.3700 -137.5800      15.6        61       134        60
OIR    2025130    131400   -8.3700 -137.5900      15.6        61       132        60
OIR    2025130    131400   -8.3700 -137.6000      15.6        61       130        60
OIR    2025130    131400   -8.3700 -137.6100      15.6        61       129        60
OIR    2025130    131400   -8.3700 -137.6200      15.7        61       128        60
OIR    2025130    131400   -8.3700 -137.6300      15.7        61       126        60
OIR    2025130    131400   -8.3700 -137.6400      15.7        61       124        60
OIR    2025130    131400   -8.3700 -137.6500      15.7        61       123        60
OIR    2025130    131400   -8.3700 -137.6600      15.7        61       123        60
OIR    2025130    131400   -8.3700 -137.6700      15.7        61       124        60
OIR    2025130    131400   -8.3700 -137.6800      15.7        60       126        60
OIR    2025130    131400   -8.3700 -137.6900      15.7        60       128        60
OIR    2025130    131400   -8.3700 -137.7000      15.7        59       129        60
OIR    2025130    131400   -8.3700 -137.7100      15.6        59       130        60
OIR    2025130    131400   -8.3700 -137.7200      15.7        59       130        60
OIR    2025130    131400   -8.3700 -137.7300      15.7        58       129        60
OIR    2025130    131400   -8.3700 -137.7400      15.7        58       128        60
OIR    2025130    131400   -8.3700 -137.7500      15.7        57       128        60
OIR    2025130    131400   -8.3700 -137.7600      15.8        57       129        60
OIR    2025130    131400   -8.3700 -137.7700      15.9        55       129        60
OIR    2025130    131400   -8.3700 -137.7800      16.0        53       130        60
OIR    2025130    131400   -8.3700 -137.7900      16.2        49       130        60
OIR    2025130    131400   -8.3700 -137.8000      17.9        35       130        60
OIR    2025130    131400   -8.3700 -137.8100      20.8        24       130        60
OIR    2025130    131400   -8.3700 -137.8200      22.2        22       130        60
OIR    2025130    131400   -8.3700 -137.8300      22.7        21       133        60
OIR    2025130    131400   -8.3700 -137.8400      22.9        20       137        60
OIR    2025130    131400   -8.3700 -137.8500      22.9        20       143        60
OIR    2025130    131400   -8.3800 -137.4300      13.2        66       144        60
OIR    2025130    131400   -8.3800 -137.4400      14.1        65       137        60
OIR    2025130    131400   -8.3800 -137.4500      15.2        63       131        60
OIR    2025130    131400   -8.3800 -137.4600      15.6        62       135        60
OIR    2025130    131400   -8.3800 -137.4700      15.6        62       138        60
OIR    2025130    131400   -8.3800 -137.4800      15.6        62       134        60
OIR    2025130    131400   -8.3800 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.3800 -137.5000      15.6        62       134        60
OIR    2025130    131400   -8.3800 -137.5100      15.6        62       133        60
OIR    2025130    131400   -8.3800 -137.5200      15.6        62       131        60
OIR    2025130    131400   -8.3800 -137.5300      15.6        62       130        60
OIR    2025130    131400   -8.3800 -137.5400      15.6        62       130        60
OIR    2025130    131400   -8.3800 -137.5500      15.6        62       133        60
OIR    2025130    131400   -8.3800 -137.5600      15.6        62       136        60
OIR    2025130    131400   -8.3800 -137.5700      15.6        62       135        60
OIR    2025130    131400   -8.3800 -137.5800      15.6        61       133        60
OIR    2025130    131400   -8.3800 -137.5900      15.6        61       132        60
OIR    2025130    131400   -8.3800 -137.6000      15.6        61       131        60
OIR    2025130    131400   -8.3800 -137.6100      15.6        61       130        60
OIR    2025130    131400   -8.3800 -137.6200      15.6        61       127        60
OIR    2025130    131400   -8.3800 -137.6300      15.7        61       124        60
OIR    2025130    131400   -8.3800 -137.6400      15.7        61       123        60
OIR    2025130    131400   -8.3800 -137.6500      15.7        61       122        60
OIR    2025130    131400   -8.3800 -137.6600      15.7        61       122        60
OIR    2025130    131400   -8.3800 -137.6700      15.7        61       122        60
OIR    2025130    131400   -8.3800 -137.6800      15.7        60       125        60
OIR    2025130    131400   -8.3800 -137.6900      15.7        59       127        60
OIR    2025130    131400   -8.3800 -137.7000      15.6        59       129        60
OIR    2025130    131400   -8.3800 -137.7100      15.6        59       130        60
OIR    2025130    131400   -8.3800 -137.7200      15.6        59       130        60
OIR    2025130    131400   -8.3800 -137.7300      15.6        59       130        60
OIR    2025130    131400   -8.3800 -137.7400      15.6        58       131        60
OIR    2025130    131400   -8.3800 -137.7500      15.6        58       130        60
OIR    2025130    131400   -8.3800 -137.7600      15.7        57       130        60
OIR    2025130    131400   -8.3800 -137.7700      15.8        56       131        60
OIR    2025130    131400   -8.3800 -137.7800      15.8        54       132        60
OIR    2025130    131400   -8.3800 -137.7900      16.0        45       133        60
OIR    2025130    131400   -8.3800 -137.8000      17.7        30       133        60
OIR    2025130    131400   -8.3800 -137.8100      20.2        22       131        60
OIR    2025130    131400   -8.3800 -137.8200      21.6        20       131        60
OIR    2025130    131400   -8.3800 -137.8300      22.3        20       135        60
OIR    2025130    131400   -8.3800 -137.8400      22.7        19       143        60
OIR    2025130    131400   -8.3900 -137.4400      13.6        67       144        60
OIR    2025130    131400   -8.3900 -137.4500      14.7        64       139        60
OIR    2025130    131400   -8.3900 -137.4600      15.4        63       135        60
OIR    2025130    131400   -8.3900 -137.4700      15.6        62       131        60
OIR    2025130    131400   -8.3900 -137.4800      15.6        62       131        60
OIR    2025130    131400   -8.3900 -137.4900      15.6        62       131        60
OIR    2025130    131400   -8.3900 -137.5000      15.6        62       132        60
OIR    2025130    131400   -8.3900 -137.5100      15.6        62       132        60
OIR    2025130    131400   -8.3900 -137.5200      15.6        62       131        60
OIR    2025130    131400   -8.3900 -137.5300      15.6        62       132        60
OIR    2025130    131400   -8.3900 -137.5400      15.6        62       132        60
OIR    2025130    131400   -8.3900 -137.5500      15.6        62       133        60
OIR    2025130    131400   -8.3900 -137.5600      15.6        62       134        60
OIR    2025130    131400   -8.3900 -137.5700      15.6        62       133        60
OIR    2025130    131400   -8.3900 -137.5800      15.6        61       132        60
OIR    2025130    131400   -8.3900 -137.5900      15.6        61       131        60
OIR    2025130    131400   -8.3900 -137.6000      15.6        61       130        60
OIR    2025130    131400   -8.3900 -137.6100      15.6        61       128        60
OIR    2025130    131400   -8.3900 -137.6200      15.6        61       126        60
OIR    2025130    131400   -8.3900 -137.6300      15.7        61       123        60
OIR    2025130    131400   -8.3900 -137.6400      15.7        61       123        60
OIR    2025130    131400   -8.3900 -137.6500      15.7        61       122        60
OIR    2025130    131400   -8.3900 -137.6600      15.7        61       122        60
OIR    2025130    131400   -8.3900 -137.6700      15.7        61       122        60
OIR    2025130    131400   -8.3900 -137.6800      15.7        60       126        60
OIR    2025130    131400   -8.3900 -137.6900      15.7        59       128        60
OIR    2025130    131400   -8.3900 -137.7000      15.7        59       128        60
OIR    2025130    131400   -8.3900 -137.7100      15.7        59       129        60
OIR    2025130    131400   -8.3900 -137.7200      15.6        59       131        60
OIR    2025130    131400   -8.3900 -137.7300      15.6        59       131        60
OIR    2025130    131400   -8.3900 -137.7400      15.6        58       131        60
OIR    2025130    131400   -8.3900 -137.7500      15.6        58       132        60
OIR    2025130    131400   -8.3900 -137.7600      15.6        58       133        60
OIR    2025130    131400   -8.3900 -137.7700      15.6        56       133        60
OIR    2025130    131400   -8.3900 -137.7800      15.6        53       134        60
OIR    2025130    131400   -8.3900 -137.7900      16.0        39       135        60
OIR    2025130    131400   -8.3900 -137.8000      17.2        27       135        60
OIR    2025130    131400   -8.3900 -137.8100      18.8        23       133        60
OIR    2025130    131400   -8.3900 -137.8200      21.0        19       136        60
OIR    2025130    131400   -8.4000 -136.3700      11.2       121       145        60
OIR    2025130    131400   -8.4000 -137.4500      14.6        66       147        60
OIR    2025130    131400   -8.4000 -137.4600      15.2        64       134        60
OIR    2025130    131400   -8.4000 -137.4700      15.6        63       129        60
OIR    2025130    131400   -8.4000 -137.4800      15.6        62       130        60
OIR    2025130    131400   -8.4000 -137.4900      15.6        62       131        60
OIR    2025130    131400   -8.4000 -137.5000      15.6        62       131        60
OIR    2025130    131400   -8.4000 -137.5100      15.6        62       131        60
OIR    2025130    131400   -8.4000 -137.5200      15.6        62       132        60
OIR    2025130    131400   -8.4000 -137.5300      15.6        62       133        60
OIR    2025130    131400   -8.4000 -137.5400      15.6        62       134        60
OIR    2025130    131400   -8.4000 -137.5500      15.6        62       133        60
OIR    2025130    131400   -8.4000 -137.5600      15.6        62       132        60
OIR    2025130    131400   -8.4000 -137.5700      15.6        62       132        60
OIR    2025130    131400   -8.4000 -137.5800      15.6        61       132        60
OIR    2025130    131400   -8.4000 -137.5900      15.6        61       131        60
OIR    2025130    131400   -8.4000 -137.6000      15.6        61       130        60
OIR    2025130    131400   -8.4000 -137.6100      15.6        61       128        60
OIR    2025130    131400   -8.4000 -137.6200      15.6        61       125        60
OIR    2025130    131400   -8.4000 -137.6300      15.6        61       122        60
OIR    2025130    131400   -8.4000 -137.6400      15.7        61       122        60
OIR    2025130    131400   -8.4000 -137.6500      15.7        61       123        60
OIR    2025130    131400   -8.4000 -137.6600      15.7        61       123        60
OIR    2025130    131400   -8.4000 -137.6700      15.7        61       124        60
OIR    2025130    131400   -8.4000 -137.6800      15.7        60       127        60
OIR    2025130    131400   -8.4000 -137.6900      15.7        59       128        60
OIR    2025130    131400   -8.4000 -137.7000      15.7        59       129        60
OIR    2025130    131400   -8.4000 -137.7100      15.7        59       130        60
OIR    2025130    131400   -8.4000 -137.7200      15.7        59       132        60
OIR    2025130    131400   -8.4000 -137.7300      15.7        59       132        60
OIR    2025130    131400   -8.4000 -137.7400      15.6        58       132        60
OIR    2025130    131400   -8.4000 -137.7500      15.6        58       134        60
OIR    2025130    131400   -8.4000 -137.7600      15.6        58       137        60
OIR    2025130    131400   -8.4000 -137.7700      15.5        57       137        60
OIR    2025130    131400   -8.4000 -137.7800      15.3        52       136        60
OIR    2025130    131400   -8.4000 -137.7900      15.7        37       138        60
OIR    2025130    131400   -8.4000 -137.8000      16.6        29       139        60
OIR    2025130    131400   -8.4000 -137.8100      17.4        25       138        60
OIR    2025130    131400   -8.4000 -137.8200      19.0        23       142        60
OIR    2025130    131400   -8.4100 -137.4600      14.5        68       139        60
OIR    2025130    131400   -8.4100 -137.4700      15.4        64       131        60
OIR    2025130    131400   -8.4100 -137.4800      15.6        63       132        60
OIR    2025130    131400   -8.4100 -137.4900      15.6        62       132        60
OIR    2025130    131400   -8.4100 -137.5000      15.6        62       130        60
OIR    2025130    131400   -8.4100 -137.5100      15.6        62       131        60
OIR    2025130    131400   -8.4100 -137.5200      15.6        62       133        60
OIR    2025130    131400   -8.4100 -137.5300      15.6        62       133        60
OIR    2025130    131400   -8.4100 -137.5400      15.6        62       133        60
OIR    2025130    131400   -8.4100 -137.5500      15.6        62       133        60
OIR    2025130    131400   -8.4100 -137.5600      15.6        62       132        60
OIR    2025130    131400   -8.4100 -137.5700      15.6        62       132        60
OIR    2025130    131400   -8.4100 -137.5800      15.6        62       132        60
OIR    2025130    131400   -8.4100 -137.5900      15.6        61       132        60
OIR    2025130    131400   -8.4100 -137.6000      15.6        61       131        60
OIR    2025130    131400   -8.4100 -137.6100      15.6        61       128        60
OIR    2025130    131400   -8.4100 -137.6200      15.6        61       125        60
OIR    2025130    131400   -8.4100 -137.6300      15.7        61       123        60
OIR    2025130    131400   -8.4100 -137.6400      15.7        61       123        60
OIR    2025130    131400   -8.4100 -137.6500      15.7        61       123        60
OIR    2025130    131400   -8.4100 -137.6600      15.7        61       124        60
OIR    2025130    131400   -8.4100 -137.6700      15.7        61       126        60
OIR    2025130    131400   -8.4100 -137.6800      15.7        60       127        60
OIR    2025130    131400   -8.4100 -137.6900      15.7        59       129        60
OIR    2025130    131400   -8.4100 -137.7000      15.7        59       130        60
OIR    2025130    131400   -8.4100 -137.7100      15.7        59       131        60
OIR    2025130    131400   -8.4100 -137.7200      15.7        59       132        60
OIR    2025130    131400   -8.4100 -137.7300      15.7        59       132        60
OIR    2025130    131400   -8.4100 -137.7400      15.7        59       133        60
OIR    2025130    131400   -8.4100 -137.7500      15.6        58       138        60
OIR    2025130    131400   -8.4100 -137.7600      15.6        58       143        60
OIR    2025130    131400   -8.4100 -137.7700      15.5        57       142        60
OIR    2025130    131400   -8.4100 -137.7800      15.3        53       141        60
OIR    2025130    131400   -8.4100 -137.7900      15.6        38       142        60
OIR    2025130    131400   -8.4100 -137.8000      16.1        31       145        60
OIR    2025130    131400   -8.4200 -137.4700      14.5        69       139        60
OIR    2025130    131400   -8.4200 -137.4800      15.4        65       136        60
OIR    2025130    131400   -8.4200 -137.4900      15.5        63       133        60
OIR    2025130    131400   -8.4200 -137.5000      15.6        63       131        60
OIR    2025130    131400   -8.4200 -137.5100      15.6        62       131        60
OIR    2025130    131400   -8.4200 -137.5200      15.6        62       133        60
OIR    2025130    131400   -8.4200 -137.5300      15.6        62       132        60
OIR    2025130    131400   -8.4200 -137.5400      15.6        62       131        60
OIR    2025130    131400   -8.4200 -137.5500      15.6        62       131        60
OIR    2025130    131400   -8.4200 -137.5600      15.6        62       132        60
OIR    2025130    131400   -8.4200 -137.5700      15.6        62       132        60
OIR    2025130    131400   -8.4200 -137.5800      15.6        62       133        60
OIR    2025130    131400   -8.4200 -137.5900      15.6        61       133        60
OIR    2025130    131400   -8.4200 -137.6000      15.6        61       132        60
OIR    2025130    131400   -8.4200 -137.6100      15.6        61       129        60
OIR    2025130    131400   -8.4200 -137.6200      15.6        61       126        60
OIR    2025130    131400   -8.4200 -137.6300      15.6        61       124        60
OIR    2025130    131400   -8.4200 -137.6400      15.6        61       124        60
OIR    2025130    131400   -8.4200 -137.6500      15.7        61       123        60
OIR    2025130    131400   -8.4200 -137.6600      15.7        61       125        60
OIR    2025130    131400   -8.4200 -137.6700      15.7        61       126        60
OIR    2025130    131400   -8.4200 -137.6800      15.7        60       128        60
OIR    2025130    131400   -8.4200 -137.6900      15.7        59       129        60
OIR    2025130    131400   -8.4200 -137.7000      15.7        59       131        60
OIR    2025130    131400   -8.4200 -137.7100      15.7        59       133        60
OIR    2025130    131400   -8.4200 -137.7200      15.7        59       132        60
OIR    2025130    131400   -8.4200 -137.7300      15.7        59       133        60
OIR    2025130    131400   -8.4200 -137.7400      15.7        59       135        60
OIR    2025130    131400   -8.4200 -137.7500      15.7        58       141        60
OIR    2025130    131400   -8.4200 -137.7600      15.7        58       147        60
OIR    2025130    131400   -8.4200 -137.7700      15.7        58       146        60
OIR    2025130    131400   -8.4200 -137.7800      15.5        55       144        60
OIR    2025130    131400   -8.4200 -137.7900      15.6        47       147        60
OIR    2025130    131400   -8.4300 -137.4800      14.4        70       144        60
OIR    2025130    131400   -8.4300 -137.4900      15.0        66       135        60
OIR    2025130    131400   -8.4300 -137.5000      15.5        64       133        60
OIR    2025130    131400   -8.4300 -137.5100      15.6        63       132        60
OIR    2025130    131400   -8.4300 -137.5200      15.6        63       133        60
OIR    2025130    131400   -8.4300 -137.5300      15.6        62       131        60
OIR    2025130    131400   -8.4300 -137.5400      15.6        62       128        60
OIR    2025130    131400   -8.4300 -137.5500      15.6        62       130        60
OIR    2025130    131400   -8.4300 -137.5600      15.6        62       132        60
OIR    2025130    131400   -8.4300 -137.5700      15.6        62       133        60
OIR    2025130    131400   -8.4300 -137.5800      15.6        62       133        60
OIR    2025130    131400   -8.4300 -137.5900      15.6        61       133        60
OIR    2025130    131400   -8.4300 -137.6000      15.6        61       132        60
OIR    2025130    131400   -8.4300 -137.6100      15.6        61       130        60
OIR    2025130    131400   -8.4300 -137.6200      15.6        61       128        60
OIR    2025130    131400   -8.4300 -137.6300      15.6        61       127        60
OIR    2025130    131400   -8.4300 -137.6400      15.6        61       126        60
OIR    2025130    131400   -8.4300 -137.6500      15.6        61       124        60
OIR    2025130    131400   -8.4300 -137.6600      15.7        61       124        60
OIR    2025130    131400   -8.4300 -137.6700      15.7        61       124        60
OIR    2025130    131400   -8.4300 -137.6800      15.7        60       127        60
OIR    2025130    131400   -8.4300 -137.6900      15.7        59       129        60
OIR    2025130    131400   -8.4300 -137.7000      15.7        59       132        60
OIR    2025130    131400   -8.4300 -137.7100      15.7        59       133        60
OIR    2025130    131400   -8.4300 -137.7200      15.7        59       133        60
OIR    2025130    131400   -8.4300 -137.7300      15.7        59       136        60
OIR    2025130    131400   -8.4300 -137.7400      15.7        59       139        60
OIR    2025130    131400   -8.4300 -137.7500      15.7        58       144        60
OIR    2025130    131400   -8.4300 -137.7600      15.7        58       148        60
OIR    2025130    131400   -8.4300 -137.7700      15.6        58       146        60
OIR    2025130    131400   -8.4300 -137.7800      15.5        56       145        60
OIR    2025130    131400   -8.4400 -137.4900      14.2        72       141        60
OIR    2025130    131400   -8.4400 -137.5000      15.1        67       137        60
OIR    2025130    131400   -8.4400 -137.5100      15.5        65       135        60
OIR    2025130    131400   -8.4400 -137.5200      15.6        63       134        60
OIR    2025130    131400   -8.4400 -137.5300      15.6        63       131        60
OIR    2025130    131400   -8.4400 -137.5400      15.6        62       128        60
OIR    2025130    131400   -8.4400 -137.5500      15.6        62       129        60
OIR    2025130    131400   -8.4400 -137.5600      15.6        62       131        60
OIR    2025130    131400   -8.4400 -137.5700      15.6        62       132        60
OIR    2025130    131400   -8.4400 -137.5800      15.6        62       133        60
OIR    2025130    131400   -8.4400 -137.5900      15.6        61       133        60
OIR    2025130    131400   -8.4400 -137.6000      15.6        61       132        60
OIR    2025130    131400   -8.4400 -137.6100      15.6        61       131        60
OIR    2025130    131400   -8.4400 -137.6200      15.6        61       130        60
OIR    2025130    131400   -8.4400 -137.6300      15.6        61       129        60
OIR    2025130    131400   -8.4400 -137.6400      15.6        61       128        60
OIR    2025130    131400   -8.4400 -137.6500      15.6        61       127        60
OIR    2025130    131400   -8.4400 -137.6600      15.6        61       125        60
OIR    2025130    131400   -8.4400 -137.6700      15.7        61       124        60
OIR    2025130    131400   -8.4400 -137.6800      15.7        60       127        60
OIR    2025130    131400   -8.4400 -137.6900      15.7        59       129        60
OIR    2025130    131400   -8.4400 -137.7000      15.7        59       130        60
OIR    2025130    131400   -8.4400 -137.7100      15.7        59       132        60
OIR    2025130    131400   -8.4400 -137.7200      15.7        59       133        60
OIR    2025130    131400   -8.4400 -137.7300      15.7        59       135        60
OIR    2025130    131400   -8.4400 -137.7400      15.7        59       138        60
OIR    2025130    131400   -8.4400 -137.7500      15.7        58       142        60
OIR    2025130    131400   -8.4400 -137.7600      15.6        58       146        60
OIR    2025130    131400   -8.4500 -137.5000      14.6        73       145        60
OIR    2025130    131400   -8.4500 -137.5100      15.1        69       140        60
OIR    2025130    131400   -8.4500 -137.5200      15.3        66       137        60
OIR    2025130    131400   -8.4500 -137.5300      15.2        65       134        60
OIR    2025130    131400   -8.4500 -137.5400      15.4        64       131        60
OIR    2025130    131400   -8.4500 -137.5500      15.6        62       131        60
OIR    2025130    131400   -8.4500 -137.5600      15.6        62       131        60
OIR    2025130    131400   -8.4500 -137.5700      15.6        62       130        60
OIR    2025130    131400   -8.4500 -137.5800      15.6        62       130        60
OIR    2025130    131400   -8.4500 -137.5900      15.6        62       131        60
OIR    2025130    131400   -8.4500 -137.6000      15.6        61       132        60
OIR    2025130    131400   -8.4500 -137.6100      15.6        61       131        60
OIR    2025130    131400   -8.4500 -137.6200      15.6        61       130        60
OIR    2025130    131400   -8.4500 -137.6300      15.6        61       130        60
OIR    2025130    131400   -8.4500 -137.6400      15.6        61       130        60
OIR    2025130    131400   -8.4500 -137.6500      15.6        61       130        60
OIR    2025130    131400   -8.4500 -137.6600      15.6        61       128        60
OIR    2025130    131400   -8.4500 -137.6700      15.7        61       127        60
OIR    2025130    131400   -8.4500 -137.6800      15.7        60       127        60
OIR    2025130    131400   -8.4500 -137.6900      15.7        59       127        60
OIR    2025130    131400   -8.4500 -137.7000      15.7        59       128        60
OIR    2025130    131400   -8.4500 -137.7100      15.7        59       130        60
OIR    2025130    131400   -8.4500 -137.7200      15.7        59       133        60
OIR    2025130    131400   -8.4500 -137.7300      15.7        59       134        60
OIR    2025130    131400   -8.4500 -137.7400      15.7        59       136        60
OIR    2025130    131400   -8.4500 -137.7500      15.6        59       139        60
OIR    2025130    131400   -8.4500 -137.7600      15.6        58       142        60
OIR    2025130    131400   -8.4600 -137.5200      14.8        70       144        60
OIR    2025130    131400   -8.4600 -137.5300      15.0        67       143        60
OIR    2025130    131400   -8.4600 -137.5400      15.3        65       142        60
OIR    2025130    131400   -8.4600 -137.5500      15.6        62       137        60
OIR    2025130    131400   -8.4600 -137.5600      15.7        62       132        60
OIR    2025130    131400   -8.4600 -137.5700      15.6        62       132        60
OIR    2025130    131400   -8.4600 -137.5800      15.6        62       132        60
OIR    2025130    131400   -8.4600 -137.5900      15.6        62       131        60
OIR    2025130    131400   -8.4600 -137.6000      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6100      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6200      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6300      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6400      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6500      15.6        61       131        60
OIR    2025130    131400   -8.4600 -137.6600      15.6        61       130        60
OIR    2025130    131400   -8.4600 -137.6700      15.6        61       129        60
OIR    2025130    131400   -8.4600 -137.6800      15.6        60       130        60
OIR    2025130    131400   -8.4600 -137.6900      15.7        59       130        60
OIR    2025130    131400   -8.4600 -137.7000      15.7        59       129        60
OIR    2025130    131400   -8.4600 -137.7100      15.7        59       130        60
OIR    2025130    131400   -8.4600 -137.7200      15.7        59       133        60
OIR    2025130    131400   -8.4600 -137.7300      15.6        59       135        60
OIR    2025130    131400   -8.4600 -137.7400      15.6        59       137        60
OIR    2025130    131400   -8.4600 -137.7500      15.6        59       142        60
OIR    2025130    131400   -8.4600 -137.7600      15.6        59       147        60
OIR    2025130    131400   -8.4700 -137.5500      15.6        63       143        60
OIR    2025130    131400   -8.4700 -137.5600      15.7        62       132        60
OIR    2025130    131400   -8.4700 -137.5700      15.7        62       134        60
OIR    2025130    131400   -8.4700 -137.5800      15.6        62       134        60
OIR    2025130    131400   -8.4700 -137.5900      15.6        62       131        60
OIR    2025130    131400   -8.4700 -137.6000      15.6        61       129        60
OIR    2025130    131400   -8.4700 -137.6100      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6200      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6300      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6400      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6500      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6600      15.6        61       131        60
OIR    2025130    131400   -8.4700 -137.6700      15.5        61       132        60
OIR    2025130    131400   -8.4700 -137.6800      15.6        60       133        60
OIR    2025130    131400   -8.4700 -137.6900      15.6        60       133        60
OIR    2025130    131400   -8.4700 -137.7000      15.6        59       131        60
OIR    2025130    131400   -8.4700 -137.7100      15.6        59       130        60
OIR    2025130    131400   -8.4700 -137.7200      15.6        59       132        60
OIR    2025130    131400   -8.4700 -137.7300      15.6        59       135        60
OIR    2025130    131400   -8.4700 -137.7400      15.6        59       138        60
OIR    2025130    131400   -8.4700 -137.7500      15.6        59       146        60
OIR    2025130    131400   -8.4800 -135.8500       8.8        94       138        60
OIR    2025130    131400   -8.4800 -135.8600       8.8        94       115        60
OIR    2025130    131400   -8.4800 -137.5600      15.6        62       140        60
OIR    2025130    131400   -8.4800 -137.5700      15.6        62       135        60
OIR    2025130    131400   -8.4800 -137.5800      15.6        62       132        60
OIR    2025130    131400   -8.4800 -137.5900      15.6        62       131        60
OIR    2025130    131400   -8.4800 -137.6000      15.6        61       131        60
OIR    2025130    131400   -8.4800 -137.6100      15.6        61       131        60
OIR    2025130    131400   -8.4800 -137.6200      15.5        61       131        60
OIR    2025130    131400   -8.4800 -137.6300      15.5        61       131        60
OIR    2025130    131400   -8.4800 -137.6400      15.5        61       131        60
OIR    2025130    131400   -8.4800 -137.6500      15.5        61       131        60
OIR    2025130    131400   -8.4800 -137.6600      15.5        61       131        60
OIR    2025130    131400   -8.4800 -137.6700      15.5        61       132        60
OIR    2025130    131400   -8.4800 -137.6800      15.5        60       132        60
OIR    2025130    131400   -8.4800 -137.6900      15.5        60       132        60
OIR    2025130    131400   -8.4800 -137.7000      15.5        59       131        60
OIR    2025130    131400   -8.4800 -137.7100      15.6        59       131        60
OIR    2025130    131400   -8.4800 -137.7200      15.6        59       132        60
OIR    2025130    131400   -8.4800 -137.7300      15.6        59       137        60
OIR    2025130    131400   -8.4800 -137.7400      15.6        59       143        60
OIR    2025130    131400   -8.4900 -135.8600       8.8        94       121        60
OIR    2025130    131400   -8.4900 -137.5700      15.7        62       136        60
OIR    2025130    131400   -8.4900 -137.5800      15.6        62       130        60
OIR    2025130    131400   -8.4900 -137.5900      15.6        62       132        60
OIR    2025130    131400   -8.4900 -137.6000      15.5        61       133        60
OIR    2025130    131400   -8.4900 -137.6100      15.5        61       132        60
OIR    2025130    131400   -8.4900 -137.6200      15.5        61       131        60
OIR    2025130    131400   -8.4900 -137.6300      15.5        61       130        60
OIR    2025130    131400   -8.4900 -137.6400      15.5        61       130        60
OIR    2025130    131400   -8.4900 -137.6500      15.5        61       130        60
OIR    2025130    131400   -8.4900 -137.6600      15.4        61       131        60
OIR    2025130    131400   -8.4900 -137.6700      15.4        61       131        60
OIR    2025130    131400   -8.4900 -137.6800      15.4        60       131        60
OIR    2025130    131400   -8.4900 -137.6900      15.4        59       131        60
OIR    2025130    131400   -8.4900 -137.7000      15.4        59       132        60
OIR    2025130    131400   -8.4900 -137.7100      15.5        59       132        60
OIR    2025130    131400   -8.4900 -137.7200      15.6        59       132        60
OIR    2025130    131400   -8.4900 -137.7300      15.6        59       138        60
OIR    2025130    131400   -8.4900 -137.7400      15.6        59       147        60
OIR    2025130    131400   -8.4900 -141.1600      16.9        66       141        60
OIR    2025130    131400   -8.5000 -137.5700      15.7        62       142        60
OIR    2025130    131400   -8.5000 -137.5800      15.6        62       136        60
OIR    2025130    131400   -8.5000 -137.5900      15.5        62       134        60
OIR    2025130    131400   -8.5000 -137.6000      15.5        61       132        60
OIR    2025130    131400   -8.5000 -137.6100      15.5        61       131        60
OIR    2025130    131400   -8.5000 -137.6200      15.5        61       132        60
OIR    2025130    131400   -8.5000 -137.6300      15.5        61       133        60
OIR    2025130    131400   -8.5000 -137.6400      15.4        61       133        60
OIR    2025130    131400   -8.5000 -137.6500      15.4        61       132        60
OIR    2025130    131400   -8.5000 -137.6600      15.3        61       132        60
OIR    2025130    131400   -8.5000 -137.6700      15.3        61       132        60
OIR    2025130    131400   -8.5000 -137.6800      15.2        60       131        60
OIR    2025130    131400   -8.5000 -137.6900      15.2        59       133        60
OIR    2025130    131400   -8.5000 -137.7000      15.3        59       136        60
OIR    2025130    131400   -8.5000 -137.7100      15.3        58       140        60
OIR    2025130    131400   -8.5000 -137.7200      15.4        58       144        60
OIR    2025130    131400   -8.5100 -137.5700      15.9        63       145        60
OIR    2025130    131400   -8.5100 -137.5800      15.6        62       139        60
OIR    2025130    131400   -8.5100 -137.5900      15.5        62       135        60
OIR    2025130    131400   -8.5100 -137.6000      15.5        61       131        60
OIR    2025130    131400   -8.5100 -137.6100      15.4        61       131        60
OIR    2025130    131400   -8.5100 -137.6200      15.4        61       133        60
OIR    2025130    131400   -8.5100 -137.6300      15.4        61       135        60
OIR    2025130    131400   -8.5100 -137.6400      15.3        62       136        60
OIR    2025130    131400   -8.5100 -137.6500      15.2        62       136        60
OIR    2025130    131400   -8.5100 -137.6600      15.1        62       135        60
OIR    2025130    131400   -8.5100 -137.6700      14.9        62       135        60
OIR    2025130    131400   -8.5100 -137.6800      14.8        61       135        60
OIR    2025130    131400   -8.5100 -137.6900      14.8        60       137        60
OIR    2025130    131400   -8.5100 -137.7000      14.9        58       142        60
OIR    2025130    131400   -8.5200 -137.5700      18.0        65       142        60
OIR    2025130    131400   -8.5200 -137.5800      15.6        62       136        60
OIR    2025130    131400   -8.5200 -137.5900      15.5        61       133        60
OIR    2025130    131400   -8.5200 -137.6000      15.4        61       131        60
OIR    2025130    131400   -8.5200 -137.6100      15.4        61       132        60
OIR    2025130    131400   -8.5200 -137.6200      15.4        61       133        60
OIR    2025130    131400   -8.5200 -137.6300      15.3        62       136        60
OIR    2025130    131400   -8.5200 -137.6400      15.1        62       141        60
OIR    2025130    131400   -8.5200 -137.6500      14.9        63       145        60
OIR    2025130    131400   -8.5200 -137.6600      14.8        63       144        60
OIR    2025130    131400   -8.5200 -137.6700      14.6        62       144        60
OIR    2025130    131400   -8.5200 -137.6800      14.5        61       144        60
OIR    2025130    131400   -8.5200 -137.6900      14.4        59       145        60
OIR    2025130    131400   -8.5300 -135.8400       8.7        94       140        60
OIR    2025130    131400   -8.5300 -137.5700      17.8        68       143        60
OIR    2025130    131400   -8.5300 -137.5800      15.5        62       137        60
OIR    2025130    131400   -8.5300 -137.5900      15.3        61       136        60
OIR    2025130    131400   -8.5300 -137.6000      15.3        61       135        60
OIR    2025130    131400   -8.5300 -137.6100      15.3        61       136        60
OIR    2025130    131400   -8.5300 -137.6200      15.3        61       138        60
OIR    2025130    131400   -8.5300 -137.6300      15.2        62       140        60
OIR    2025130    131400   -8.5300 -137.6400      14.9        63       147        60
OIR    2025130    131400   -8.5400 -137.5800      15.3        62       144        60
OIR    2025130    131400   -8.5400 -137.5900      15.1        61       143        60
OIR    2025130    131400   -8.5400 -137.6000      15.1        60       144        60
OIR    2025130    131400   -8.5400 -137.6100      15.1        61       145        60
OIR    2025130    131400   -8.5400 -137.6200      15.0        61       147        60
OIR    2025130    131400   -8.5500 -138.4000       4.7       125       145        60
OIR    2025130    131400   -8.5600 -138.3500       5.3       144       144        60
OIR    2025130    131400   -8.5600 -138.3600       6.0       111       142        60
OIR    2025130    131400   -8.5600 -138.3700       5.9       113       143        60
OIR    2025130    131400   -8.5600 -138.3800       5.0       121       141        60
OIR    2025130    131400   -8.5600 -138.3900       4.2       130       135        60
OIR    2025130    131400   -8.5600 -138.4000       4.2       135       130        60
OIR    2025130    131400   -8.5600 -138.4100       4.1       142       137        60
OIR    2025130    131400   -8.5600 -138.4200       4.1       143       143        60
OIR    2025130    131400   -8.5700 -138.3500       5.9       128       143        60
OIR    2025130    131400   -8.5700 -138.3600       5.7       118       139        60
OIR    2025130    131400   -8.5700 -138.3700       5.5       117       138        60
OIR    2025130    131400   -8.5700 -138.3800       4.6       125       136        60
OIR    2025130    131400   -8.5700 -138.3900       4.2       132       132        60
OIR    2025130    131400   -8.5700 -138.4000       4.2       135       130        60
OIR    2025130    131400   -8.5700 -138.4100       4.1       140       134        60
OIR    2025130    131400   -8.5700 -138.4200       4.1       141       138        60
OIR    2025130    131400   -8.5800 -138.3500       4.8       132       145        60
OIR    2025130    131400   -8.5800 -138.3600       5.6       121       137        60
OIR    2025130    131400   -8.5800 -138.3700       5.5       120       134        60
OIR    2025130    131400   -8.5800 -138.3800       4.7       127       132        60
OIR    2025130    131400   -8.5800 -138.3900       4.3       133       131        60
OIR    2025130    131400   -8.5800 -138.4000       4.2       135       132        60
OIR    2025130    131400   -8.5800 -138.4100       4.1       139       133        60
OIR    2025130    131400   -8.5800 -138.4200       4.1       141       134        60
OIR    2025130    131400   -8.5900 -138.3400       8.9       135       144        60
OIR    2025130    131400   -8.5900 -138.3500       5.7       122       137        60
OIR    2025130    131400   -8.5900 -138.3600       5.6       121       132        60
OIR    2025130    131400   -8.5900 -138.3700       5.4       121       130        60
OIR    2025130    131400   -8.5900 -138.3800       4.6       127       128        60
OIR    2025130    131400   -8.5900 -138.3900       4.3       131       128        60
OIR    2025130    131400   -8.5900 -138.4000       4.2       134       127        60
OIR    2025130    131400   -8.5900 -138.4100       4.1       137       128        60
OIR    2025130    131400   -8.5900 -138.4200       4.0       138       128        60
OIR    2025130    131400   -8.5900 -138.5400       4.9       160       143        60
OIR    2025130    131400   -8.5900 -138.5500       6.0       149       142        60
OIR    2025130    131400   -8.5900 -138.5600       6.2       142       142        60
OIR    2025130    131400   -8.5900 -138.5700       6.1       140       140        60
OIR    2025130    131400   -8.6000 -138.3300       6.8        99       143        60
OIR    2025130    131400   -8.6000 -138.3400       6.1       109       134        60
OIR    2025130    131400   -8.6000 -138.3500       5.8       119       130        60
OIR    2025130    131400   -8.6000 -138.3600       5.6       120       128        60
OIR    2025130    131400   -8.6000 -138.3700       5.0       123       126        60
OIR    2025130    131400   -8.6000 -138.3800       4.3       127       125        60
OIR    2025130    131400   -8.6000 -138.3900       4.1       129       124        60
OIR    2025130    131400   -8.6000 -138.4000       4.1       131       124        60
OIR    2025130    131400   -8.6000 -138.4100       4.0       134       124        60
OIR    2025130    131400   -8.6000 -138.5500       4.0       153       127        60
OIR    2025130    131400   -8.6100 -138.3000       6.9       106       144        60
OIR    2025130    131400   -8.6100 -138.3100       6.8       105       139        60
OIR    2025130    131400   -8.6100 -138.3200       6.4       102       142        60
OIR    2025130    131400   -8.6100 -138.3300       6.2       102       138        60
OIR    2025130    131400   -8.6100 -138.3400       5.9       106       132        60
OIR    2025130    131400   -8.6100 -138.3500       5.5       116       129        60
OIR    2025130    131400   -8.6100 -138.3600       5.2       119       126        60
OIR    2025130    131400   -8.6100 -138.3700       4.3       123       124        60
OIR    2025130    131400   -8.6100 -138.3800       4.1       125       123        60
OIR    2025130    131400   -8.6100 -138.3900       4.0       126       123        60
OIR    2025130    131400   -8.6100 -138.4000       4.0       128       123        60
OIR    2025130    131400   -8.6200 -138.3000       6.9       106       136        60
OIR    2025130    131400   -8.6200 -138.3100       6.7       104       131        60
OIR    2025130    131400   -8.6200 -138.3200       6.1       103       136        60
OIR    2025130    131400   -8.6200 -138.3300       5.8       104       134        60
OIR    2025130    131400   -8.6200 -138.3400       5.5       106       130        60
OIR    2025130    131400   -8.6200 -138.3500       5.0       114       127        60
OIR    2025130    131400   -8.6200 -138.3600       4.7       118       124        60
OIR    2025130    131400   -8.6200 -138.3700       4.2       123       123        60
OIR    2025130    131400   -8.6200 -138.3800       4.1       125       122        60
OIR    2025130    131400   -8.6200 -138.3900       4.0       125       122        60
OIR    2025130    131400   -8.6200 -138.4000       4.0       127       122        60
OIR    2025130    131400   -8.6300 -138.3000       7.1       115       139        60
OIR    2025130    131400   -8.6300 -138.3100       6.7       107       133        60
OIR    2025130    131400   -8.6300 -138.3200       5.8       106       132        60
OIR    2025130    131400   -8.6300 -138.3300       5.6       107       130        60
OIR    2025130    131400   -8.6300 -138.3400       5.4       109       128        60
OIR    2025130    131400   -8.6300 -138.3500       5.0       114       125        60
OIR    2025130    131400   -8.6300 -138.3600       4.6       118       123        60
OIR    2025130    131400   -8.6300 -138.3700       4.2       123       122        60
OIR    2025130    131400   -8.6300 -138.3800       4.1       124       121        60
OIR    2025130    131400   -8.6300 -138.3900       4.0       125       121        60
OIR    2025130    131400   -8.6400 -138.2900       6.9       135       145        60
OIR    2025130    131400   -8.6400 -138.3000       7.7       121       139        60
OIR    2025130    131400   -8.6400 -138.3100       6.7       113       134        60
OIR    2025130    131400   -8.6400 -138.3200       5.7       109       129        60
OIR    2025130    131400   -8.6400 -138.3300       5.5       110       127        60
OIR    2025130    131400   -8.6400 -138.3400       5.4       111       125        60
OIR    2025130    131400   -8.6400 -138.3500       5.0       114       124        60
OIR    2025130    131400   -8.6400 -138.3600       4.6       117       122        60
OIR    2025130    131400   -8.6400 -138.3700       4.2       122       121        60
OIR    2025130    131400   -8.6400 -138.3800       4.1       124       121        60
OIR    2025130    131400   -8.6400 -138.3900       4.0       124       121        60
OIR    2025130    131400   -8.6500 -138.2800       9.3       127       143        60
OIR    2025130    131400   -8.6500 -138.2900       8.0       124       137        60
OIR    2025130    131400   -8.6500 -138.3000       7.9       122       135        60
OIR    2025130    131400   -8.6500 -138.3100       6.8       116       132        60
OIR    2025130    131400   -8.6500 -138.3200       5.7       112       127        60
OIR    2025130    131400   -8.6500 -138.3300       5.6       111       125        60
OIR    2025130    131400   -8.6500 -138.3400       5.4       111       124        60
OIR    2025130    131400   -8.6500 -138.3500       5.0       113       122        60
OIR    2025130    131400   -8.6500 -138.3600       4.5       117       121        60
OIR    2025130    131400   -8.6500 -138.3700       4.2       121       120        60
OIR    2025130    131400   -8.6500 -138.3800       4.1       122       120        60
OIR    2025130    131400   -8.6500 -138.3900       4.0       123       120        60
OIR    2025130    131400   -8.6600 -138.2400      13.9        89       146        60
OIR    2025130    131400   -8.6600 -138.2500      12.2        89       146        60
OIR    2025130    131400   -8.6600 -138.2600       9.9        94       146        60
OIR    2025130    131400   -8.6600 -138.2700       8.3       109       143        60
OIR    2025130    131400   -8.6600 -138.2800       8.1       120       135        60
OIR    2025130    131400   -8.6600 -138.2900       8.0       121       132        60
OIR    2025130    131400   -8.6600 -138.3000       7.9       120       130        60
OIR    2025130    131400   -8.6600 -138.3100       6.7       115       128        60
OIR    2025130    131400   -8.6600 -138.3200       5.8       111       124        60
OIR    2025130    131400   -8.6600 -138.3300       5.6       111       123        60
OIR    2025130    131400   -8.6600 -138.3400       5.4       111       122        60
OIR    2025130    131400   -8.6600 -138.3500       5.0       113       121        60
OIR    2025130    131400   -8.6600 -138.3600       4.5       116       120        60
OIR    2025130    131400   -8.6600 -138.3700       4.2       119       119        60
OIR    2025130    131400   -8.6600 -138.3800       4.1       121       117        60
OIR    2025130    131400   -8.6600 -138.3900       4.0       122       117        60
OIR    2025130    131400   -8.6700 -138.2200      14.0       125       140        60
OIR    2025130    131400   -8.6700 -138.2300      12.1       121       130        60
OIR    2025130    131400   -8.6700 -138.2400      11.4       116       133        60
OIR    2025130    131400   -8.6700 -138.2500      10.5       116       136        60
OIR    2025130    131400   -8.6700 -138.2600       9.5       118       136        60
OIR    2025130    131400   -8.6700 -138.2700       8.5       120       134        60
OIR    2025130    131400   -8.6700 -138.2800       8.2       121       130        60
OIR    2025130    131400   -8.6700 -138.2900       7.9       121       127        60
OIR    2025130    131400   -8.6700 -138.3000       7.3       118       125        60
OIR    2025130    131400   -8.6700 -138.3100       6.3       113       123        60
OIR    2025130    131400   -8.6700 -138.3200       5.8       111       122        60
OIR    2025130    131400   -8.6700 -138.3300       5.6       111       122        60
OIR    2025130    131400   -8.6700 -138.3400       5.4       111       121        60
OIR    2025130    131400   -8.6700 -138.3500       5.0       113       120        60
OIR    2025130    131400   -8.6700 -138.3600       4.6       115       117        60
OIR    2025130    131400   -8.6700 -138.3700       4.3       118       116        60
OIR    2025130    131400   -8.6700 -138.3800       4.1       120       116        60
OIR    2025130    131400   -8.6700 -138.3900       4.0       121       116        60
OIR    2025130    131400   -8.6700 -138.6700       4.8       212       130        60
OIR    2025130    131400   -8.6700 -138.6800       6.1       209       130        60
OIR    2025130    131400   -8.6700 -138.6900       6.2       209       131        60
OIR    2025130    131400   -8.6700 -138.7000       6.2       208       134        60
OIR    2025130    131400   -8.6700 -138.7100       6.0       209       140        60
OIR    2025130    131400   -8.6800 -138.2200      13.0       122       141        60
OIR    2025130    131400   -8.6800 -138.2300      11.0       124       130        60
OIR    2025130    131400   -8.6800 -138.2400      10.5       122       132        60
OIR    2025130    131400   -8.6800 -138.2500      10.0       121       133        60
OIR    2025130    131400   -8.6800 -138.2600       9.3       121       131        60
OIR    2025130    131400   -8.6800 -138.2700       8.3       121       130        60
OIR    2025130    131400   -8.6800 -138.2800       7.8       121       128        60
OIR    2025130    131400   -8.6800 -138.2900       7.2       119       125        60
OIR    2025130    131400   -8.6800 -138.3000       6.6       115       122        60
OIR    2025130    131400   -8.6800 -138.3100       6.0       111       120        60
OIR    2025130    131400   -8.6800 -138.3200       5.8       110       117        60
OIR    2025130    131400   -8.6800 -138.3300       5.7       110       119        60
OIR    2025130    131400   -8.6800 -138.3400       5.5       110       120        60
OIR    2025130    131400   -8.6800 -138.3500       5.0       112       117        60
OIR    2025130    131400   -8.6800 -138.3600       4.7       114       116        60
OIR    2025130    131400   -8.6800 -138.3700       4.4       116       116        60
OIR    2025130    131400   -8.6800 -138.3800       4.2       118       116        60
OIR    2025130    131400   -8.6800 -138.3900       4.0       119       116        60
OIR    2025130    131400   -8.6800 -138.6700       4.4       210       127        60
OIR    2025130    131400   -8.6800 -138.6800       6.1       209       127        60
OIR    2025130    131400   -8.6800 -138.6900       6.2       209       129        60
OIR    2025130    131400   -8.6800 -138.7000       6.2       209       132        60
OIR    2025130    131400   -8.6800 -138.7100       6.1       212       136        60
OIR    2025130    131400   -8.6800 -138.7200       5.6       218       142        60
OIR    2025130    131400   -8.6800 -138.7300       4.4       229       143        60
OIR    2025130    131400   -8.6900 -138.2200      13.1       126       144        60
OIR    2025130    131400   -8.6900 -138.2300      10.2       123       133        60
OIR    2025130    131400   -8.6900 -138.2400       9.8       120       131        60
OIR    2025130    131400   -8.6900 -138.2500       9.3       119       129        60
OIR    2025130    131400   -8.6900 -138.2600       8.5       119       128        60
OIR    2025130    131400   -8.6900 -138.2700       7.6       117       126        60
OIR    2025130    131400   -8.6900 -138.2800       6.9       116       126        60
OIR    2025130    131400   -8.6900 -138.2900       6.5       113       123        60
OIR    2025130    131400   -8.6900 -138.3000       6.2       111       120        60
OIR    2025130    131400   -8.6900 -138.3100       5.9       109       116        60
OIR    2025130    131400   -8.6900 -138.3200       5.8       109       114        60
OIR    2025130    131400   -8.6900 -138.3300       5.7       108       116        60
OIR    2025130    131400   -8.6900 -138.3400       5.5       109       117        60
OIR    2025130    131400   -8.6900 -138.3500       5.0       111       116        60
OIR    2025130    131400   -8.6900 -138.3600       4.8       112       115        60
OIR    2025130    131400   -8.6900 -138.3700       4.5       114       115        60
OIR    2025130    131400   -8.6900 -138.3800       4.2       115       115        60
OIR    2025130    131400   -8.6900 -138.3900       4.0       117       115        60
OIR    2025130    131400   -8.6900 -138.6700       4.5       207       125        60
OIR    2025130    131400   -8.6900 -138.6800       5.7       209       126        60
OIR    2025130    131400   -8.6900 -138.6900       6.0       210       128        60
OIR    2025130    131400   -8.6900 -138.7000       6.0       211       132        60
OIR    2025130    131400   -8.6900 -138.7100       5.9       214       133        60
OIR    2025130    131400   -8.6900 -138.7200       5.5       221       131        60
OIR    2025130    131400   -8.6900 -138.7300       4.8       228       130        60
OIR    2025130    131400   -8.6900 -140.4000      20.3        32       137        60
OIR    2025130    131400   -8.7000 -138.2200      11.8       130       138        60
OIR    2025130    131400   -8.7000 -138.2300       9.6       121       130        60
OIR    2025130    131400   -8.7000 -138.2400       9.2       118       128        60
OIR    2025130    131400   -8.7000 -138.2500       8.6       116       126        60
OIR    2025130    131400   -8.7000 -138.2600       7.8       114       124        60
OIR    2025130    131400   -8.7000 -138.2700       7.1       113       123        60
OIR    2025130    131400   -8.7000 -138.2800       6.6       112       123        60
OIR    2025130    131400   -8.7000 -138.2900       6.3       110       121        60
OIR    2025130    131400   -8.7000 -138.3000       6.1       108       116        60
OIR    2025130    131400   -8.7000 -138.3100       5.9       107       114        60
OIR    2025130    131400   -8.7000 -138.3200       5.8       107       115        60
OIR    2025130    131400   -8.7000 -138.3300       5.7       107       116        60
OIR    2025130    131400   -8.7000 -138.3400       5.5       107       117        60
OIR    2025130    131400   -8.7000 -138.3500       5.1       109       116        60
OIR    2025130    131400   -8.7000 -138.3600       4.9       110       116        60
OIR    2025130    131400   -8.7000 -138.3700       4.6       111       114        60
OIR    2025130    131400   -8.7000 -138.3800       4.3       113       113        60
OIR    2025130    131400   -8.7000 -138.3900       4.1       114       115        60
OIR    2025130    131400   -8.7000 -138.6800       4.8       210       123        60
OIR    2025130    131400   -8.7000 -138.6900       5.4       212       125        60
OIR    2025130    131400   -8.7000 -138.7000       5.6       214       128        60
OIR    2025130    131400   -8.7000 -138.7100       5.4       218       129        60
OIR    2025130    131400   -8.7000 -138.7200       5.0       225       127        60
OIR    2025130    131400   -8.7000 -138.7300       4.5       231       127        60
OIR    2025130    131400   -8.7000 -140.4000      20.3        32       133        60
OIR    2025130    131400   -8.7100 -138.2100      24.6       151       141        60
OIR    2025130    131400   -8.7100 -138.2200      11.2       130       133        60
OIR    2025130    131400   -8.7100 -138.2300       9.3       117       127        60
OIR    2025130    131400   -8.7100 -138.2400       8.6       113       124        60
OIR    2025130    131400   -8.7100 -138.2500       8.0       111       122        60
OIR    2025130    131400   -8.7100 -138.2600       7.5       110       121        60
OIR    2025130    131400   -8.7100 -138.2700       7.0       110       121        60
OIR    2025130    131400   -8.7100 -138.2800       6.6       109       121        60
OIR    2025130    131400   -8.7100 -138.2900       6.3       108       117        60
OIR    2025130    131400   -8.7100 -138.3000       6.1       107       113        60
OIR    2025130    131400   -8.7100 -138.3100       6.0       106       112        60
OIR    2025130    131400   -8.7100 -138.3200       5.8       106       115        60
OIR    2025130    131400   -8.7100 -138.3300       5.7       106       116        60
OIR    2025130    131400   -8.7100 -138.3400       5.6       106       116        60
OIR    2025130    131400   -8.7100 -138.3500       5.3       107       116        60
OIR    2025130    131400   -8.7100 -138.3600       5.0       108       116        60
OIR    2025130    131400   -8.7100 -138.3700       4.7       109       112        60
OIR    2025130    131400   -8.7100 -138.3800       4.5       109       111        60
OIR    2025130    131400   -8.7100 -138.3900       4.2       110       115        60
OIR    2025130    131400   -8.7100 -138.4000       4.0       111       116        60
OIR    2025130    131400   -8.7100 -138.6900       4.2       217       122        60
OIR    2025130    131400   -8.7100 -138.7000       4.7       220       125        60
OIR    2025130    131400   -8.7100 -138.7100       4.7       223       126        60
OIR    2025130    131400   -8.7100 -138.7200       4.5       229       124        60
OIR    2025130    131400   -8.7100 -140.4000      20.1        32       133        60
OIR    2025130    131400   -8.7200 -136.9300      16.1       132       148        60
OIR    2025130    131400   -8.7200 -136.9400      16.1       132       147        60
OIR    2025130    131400   -8.7200 -136.9500      16.1       133       146        60
OIR    2025130    131400   -8.7200 -136.9600      16.1       133       147        60
OIR    2025130    131400   -8.7200 -138.2100      16.3       147       135        60
OIR    2025130    131400   -8.7200 -138.2200      10.9       119       127        60
OIR    2025130    131400   -8.7200 -138.2300       9.0       111       122        60
OIR    2025130    131400   -8.7200 -138.2400       8.1       108       121        60
OIR    2025130    131400   -8.7200 -138.2500       7.8       108       121        60
OIR    2025130    131400   -8.7200 -138.2600       7.5       108       121        60
OIR    2025130    131400   -8.7200 -138.2700       7.1       108       121        60
OIR    2025130    131400   -8.7200 -138.2800       6.7       107       121        60
OIR    2025130    131400   -8.7200 -138.2900       6.4       106       119        60
OIR    2025130    131400   -8.7200 -138.3000       6.2       105       116        60
OIR    2025130    131400   -8.7200 -138.3100       6.1       105       115        60
OIR    2025130    131400   -8.7200 -138.3200       5.9       104       115        60
OIR    2025130    131400   -8.7200 -138.3300       5.8       104       115        60
OIR    2025130    131400   -8.7200 -138.3400       5.6       104       115        60
OIR    2025130    131400   -8.7200 -138.3500       5.4       104       115        60
OIR    2025130    131400   -8.7200 -138.3600       5.2       105       114        60
OIR    2025130    131400   -8.7200 -138.3700       4.9       106       113        60
OIR    2025130    131400   -8.7200 -138.3800       4.6       106       113        60
OIR    2025130    131400   -8.7200 -138.3900       4.3       107       115        60
OIR    2025130    131400   -8.7200 -138.4000       4.1       107       116        60
OIR    2025130    131400   -8.7200 -140.4000      20.1        33       141        60
OIR    2025130    131400   -8.7300 -136.9200      15.9       129       147        60
OIR    2025130    131400   -8.7300 -136.9300      16.0       131       144        60
OIR    2025130    131400   -8.7300 -136.9400      16.1       132       142        60
OIR    2025130    131400   -8.7300 -136.9500      16.1       132       141        60
OIR    2025130    131400   -8.7300 -136.9600      16.1       133       141        60
OIR    2025130    131400   -8.7300 -136.9700      16.2       133       142        60
OIR    2025130    131400   -8.7300 -136.9800      16.2       134       147        60
OIR    2025130    131400   -8.7300 -137.0100      16.5       136       148        60
OIR    2025130    131400   -8.7300 -138.1800       4.9       126       148        60
OIR    2025130    131400   -8.7300 -138.1900       7.6       148       145        60
OIR    2025130    131400   -8.7300 -138.2000      12.8       142       140        60
OIR    2025130    131400   -8.7300 -138.2100      12.3       124       129        60
OIR    2025130    131400   -8.7300 -138.2200      10.0       110       123        60
OIR    2025130    131400   -8.7300 -138.2300       8.2       105       117        60
OIR    2025130    131400   -8.7300 -138.2400       7.9       105       117        60
OIR    2025130    131400   -8.7300 -138.2500       7.8       106       117        60
OIR    2025130    131400   -8.7300 -138.2600       7.5       107       119        60
OIR    2025130    131400   -8.7300 -138.2700       7.2       106       120        60
OIR    2025130    131400   -8.7300 -138.2800       6.9       105       119        60
OIR    2025130    131400   -8.7300 -138.2900       6.6       103       117        60
OIR    2025130    131400   -8.7300 -138.3000       6.4       102       116        60
OIR    2025130    131400   -8.7300 -138.3100       6.2       103       116        60
OIR    2025130    131400   -8.7300 -138.3200       6.0       103       115        60
OIR    2025130    131400   -8.7300 -138.3300       5.9       102       114        60
OIR    2025130    131400   -8.7300 -138.3400       5.7       103       114        60
OIR    2025130    131400   -8.7300 -138.3500       5.5       103       113        60
OIR    2025130    131400   -8.7300 -138.3600       5.3       103       113        60
OIR    2025130    131400   -8.7300 -138.3700       5.1       103       113        60
OIR    2025130    131400   -8.7300 -138.3800       4.8       103       114        60
OIR    2025130    131400   -8.7300 -138.3900       4.4       104       115        60
OIR    2025130    131400   -8.7300 -138.4000       4.2       104       116        60
OIR    2025130    131400   -8.7300 -140.4000      20.0        33       145        60
OIR    2025130    131400   -8.7400 -136.9100      15.9       125       148        60
OIR    2025130    131400   -8.7400 -136.9200      15.8       127       145        60
OIR    2025130    131400   -8.7400 -136.9300      15.8       129       143        60
OIR    2025130    131400   -8.7400 -136.9400      16.0       131       141        60
OIR    2025130    131400   -8.7400 -136.9500      16.0       132       139        60
OIR    2025130    131400   -8.7400 -136.9600      16.1       133       139        60
OIR    2025130    131400   -8.7400 -136.9700      16.2       133       139        60
OIR    2025130    131400   -8.7400 -136.9800      16.2       134       141        60
OIR    2025130    131400   -8.7400 -136.9900      16.3       134       144        60
OIR    2025130    131400   -8.7400 -137.0000      16.3       135       143        60
OIR    2025130    131400   -8.7400 -137.0100      16.3       135       143        60
OIR    2025130    131400   -8.7400 -137.0200      16.4       136       142        60
OIR    2025130    131400   -8.7400 -137.0300      16.3       137       143        60
OIR    2025130    131400   -8.7400 -137.0400      16.3       137       146        60
OIR    2025130    131400   -8.7400 -138.1500      32.7        84       143        60
OIR    2025130    131400   -8.7400 -138.1600      31.1        85       140        60
OIR    2025130    131400   -8.7400 -138.1700      18.4        69       138        60
OIR    2025130    131400   -8.7400 -138.1800       9.8        74       136        60
OIR    2025130    131400   -8.7400 -138.1900      10.0       101       134        60
OIR    2025130    131400   -8.7400 -138.2000      10.7       110       130        60
OIR    2025130    131400   -8.7400 -138.2100      10.2       106       124        60
OIR    2025130    131400   -8.7400 -138.2200       9.1       102       119        60
OIR    2025130    131400   -8.7400 -138.2300       8.1       101       116        60
OIR    2025130    131400   -8.7400 -138.2400       7.9       103       115        60
OIR    2025130    131400   -8.7400 -138.2500       7.7       103       113        60
OIR    2025130    131400   -8.7400 -138.2600       7.6       103       115        60
OIR    2025130    131400   -8.7400 -138.2700       7.4       102       116        60
OIR    2025130    131400   -8.7400 -138.2800       7.1       100       116        60
OIR    2025130    131400   -8.7400 -138.2900       6.9        99       116        60
OIR    2025130    131400   -8.7400 -138.3000       6.7        98       115        60
OIR    2025130    131400   -8.7400 -138.3100       6.4        99       114        60
OIR    2025130    131400   -8.7400 -138.3200       6.2       100       115        60
OIR    2025130    131400   -8.7400 -138.3300       6.0       101       115        60
OIR    2025130    131400   -8.7400 -138.3400       5.9       101       114        60
OIR    2025130    131400   -8.7400 -138.3500       5.7       101       113        60
OIR    2025130    131400   -8.7400 -138.3600       5.5       101       111        60
OIR    2025130    131400   -8.7400 -138.3700       5.3       101       111        60
OIR    2025130    131400   -8.7400 -138.3800       5.0       101       112        60
OIR    2025130    131400   -8.7400 -138.3900       4.6       101       115        60
OIR    2025130    131400   -8.7400 -138.4000       4.3       101       116        60
OIR    2025130    131400   -8.7400 -138.4100       4.0       101       116        60
OIR    2025130    131400   -8.7400 -138.7800       4.1       322       138        60
OIR    2025130    131400   -8.7400 -138.7900       4.1       314       135        60
OIR    2025130    131400   -8.7400 -138.8000       4.0       307       133        60
OIR    2025130    131400   -8.7400 -140.4000      20.0        33       144        60
OIR    2025130    131400   -8.7500 -136.8800      16.4       120       147        60
OIR    2025130    131400   -8.7500 -136.8900      16.3       121       147        60
OIR    2025130    131400   -8.7500 -136.9000      16.1       122       148        60
OIR    2025130    131400   -8.7500 -136.9100      15.7       124       146        60
OIR    2025130    131400   -8.7500 -136.9200      15.6       125       143        60
OIR    2025130    131400   -8.7500 -136.9300      15.6       127       142        60
OIR    2025130    131400   -8.7500 -136.9400      15.7       129       140        60
OIR    2025130    131400   -8.7500 -136.9500      15.9       130       138        60
OIR    2025130    131400   -8.7500 -136.9600      16.0       132       137        60
OIR    2025130    131400   -8.7500 -136.9700      16.1       133       136        60
OIR    2025130    131400   -8.7500 -136.9800      16.2       133       136        60
OIR    2025130    131400   -8.7500 -136.9900      16.2       134       137        60
OIR    2025130    131400   -8.7500 -137.0000      16.2       134       137        60
OIR    2025130    131400   -8.7500 -137.0100      16.2       135       137        60
OIR    2025130    131400   -8.7500 -137.0200      16.3       135       136        60
OIR    2025130    131400   -8.7500 -137.0300      16.2       136       135        60
OIR    2025130    131400   -8.7500 -137.0400      16.0       134       137        60
OIR    2025130    131400   -8.7500 -137.0500      15.7       131       142        60
OIR    2025130    131400   -8.7500 -137.0600      15.5       129       147        60
OIR    2025130    131400   -8.7500 -137.0700      15.4       127       149        60
OIR    2025130    131400   -8.7500 -137.0800      15.4       127       149        60
OIR    2025130    131400   -8.7500 -137.0900      15.4       127       148        60
OIR    2025130    131400   -8.7500 -137.1000      15.4       127       148        60
OIR    2025130    131400   -8.7500 -137.1100      15.4       127       148        60
OIR    2025130    131400   -8.7500 -137.1200      14.9       125       149        60
OIR    2025130    131400   -8.7500 -138.1400      29.6        90       137        60
OIR    2025130    131400   -8.7500 -138.1500      27.7        95       133        60
OIR    2025130    131400   -8.7500 -138.1600      21.6        90       131        60
OIR    2025130    131400   -8.7500 -138.1700      13.1        92       129        60
OIR    2025130    131400   -8.7500 -138.1800      10.2        94       127        60
OIR    2025130    131400   -8.7500 -138.1900      10.0        96       126        60
OIR    2025130    131400   -8.7500 -138.2000       9.9       100       123        60
OIR    2025130    131400   -8.7500 -138.2100       9.2        97       119        60
OIR    2025130    131400   -8.7500 -138.2200       8.3        92       116        60
OIR    2025130    131400   -8.7500 -138.2300       8.1        93       115        60
OIR    2025130    131400   -8.7500 -138.2400       8.0        97       113        60
OIR    2025130    131400   -8.7500 -138.2500       7.8       101       110        60
OIR    2025130    131400   -8.7500 -138.2600       7.6       101       112        60
OIR    2025130    131400   -8.7500 -138.2700       7.5       100       114        60
OIR    2025130    131400   -8.7500 -138.2800       7.3        98       114        60
OIR    2025130    131400   -8.7500 -138.2900       7.1        97       113        60
OIR    2025130    131400   -8.7500 -138.3000       6.9        97       112        60
OIR    2025130    131400   -8.7500 -138.3100       6.7        97       112        60
OIR    2025130    131400   -8.7500 -138.3200       6.4        98       114        60
OIR    2025130    131400   -8.7500 -138.3300       6.2        99       114        60
OIR    2025130    131400   -8.7500 -138.3400       6.0       100       113        60
OIR    2025130    131400   -8.7500 -138.3500       5.8       100       112        60
OIR    2025130    131400   -8.7500 -138.3600       5.6       100       110        60
OIR    2025130    131400   -8.7500 -138.3700       5.4        99       110        60
OIR    2025130    131400   -8.7500 -138.3800       5.1        99       111        60
OIR    2025130    131400   -8.7500 -138.3900       4.7        98       113        60
OIR    2025130    131400   -8.7500 -138.4000       4.4        98       113        60
OIR    2025130    131400   -8.7500 -138.4100       4.1        98       113        60
OIR    2025130    131400   -8.7500 -138.7700       4.1       326       136        60
OIR    2025130    131400   -8.7500 -138.7800       4.2       324       137        60
OIR    2025130    131400   -8.7500 -138.7900       4.3       322       137        60
OIR    2025130    131400   -8.7500 -138.8000       4.2       320       135        60
OIR    2025130    131400   -8.7500 -138.8100       4.1       314       131        60
OIR    2025130    131400   -8.7600 -136.8800      16.3       120       146        60
OIR    2025130    131400   -8.7600 -136.8900      16.1       121       146        60
OIR    2025130    131400   -8.7600 -136.9000      15.9       121       145        60
OIR    2025130    131400   -8.7600 -136.9100      15.6       123       146        60
OIR    2025130    131400   -8.7600 -136.9200      15.5       124       145        60
OIR    2025130    131400   -8.7600 -136.9300      15.5       125       141        60
OIR    2025130    131400   -8.7600 -136.9400      15.6       126       139        60
OIR    2025130    131400   -8.7600 -136.9500      15.7       127       138        60
OIR    2025130    131400   -8.7600 -136.9600      15.9       129       136        60
OIR    2025130    131400   -8.7600 -136.9700      16.0       131       134        60
OIR    2025130    131400   -8.7600 -136.9800      16.1       132       133        60
OIR    2025130    131400   -8.7600 -136.9900      16.1       133       133        60
OIR    2025130    131400   -8.7600 -137.0000      16.1       133       133        60
OIR    2025130    131400   -8.7600 -137.0100      15.9       132       133        60
OIR    2025130    131400   -8.7600 -137.0200      15.8       131       133        60
OIR    2025130    131400   -8.7600 -137.0300      15.6       130       133        60
OIR    2025130    131400   -8.7600 -137.0400      15.5       129       134        60
OIR    2025130    131400   -8.7600 -137.0500      15.5       128       136        60
OIR    2025130    131400   -8.7600 -137.0600      15.5       128       139        60
OIR    2025130    131400   -8.7600 -137.0700      15.4       127       140        60
OIR    2025130    131400   -8.7600 -137.0800      15.4       127       142        60
OIR    2025130    131400   -8.7600 -137.0900      15.4       127       141        60
OIR    2025130    131400   -8.7600 -137.1000      15.4       127       140        60
OIR    2025130    131400   -8.7600 -137.1100      15.4       126       141        60
OIR    2025130    131400   -8.7600 -137.1200      15.2       124       142        60
OIR    2025130    131400   -8.7600 -138.1300      26.9        94       145        60
OIR    2025130    131400   -8.7600 -138.1400      26.0        95       135        60
OIR    2025130    131400   -8.7600 -138.1500      21.3        92       131        60
OIR    2025130    131400   -8.7600 -138.1600      13.3        99       127        60
OIR    2025130    131400   -8.7600 -138.1700      10.7        98       125        60
OIR    2025130    131400   -8.7600 -138.1800       9.4        93       123        60
OIR    2025130    131400   -8.7600 -138.1900       8.8        91       121        60
OIR    2025130    131400   -8.7600 -138.2000       8.3        88       119        60
OIR    2025130    131400   -8.7600 -138.2100       8.2        88       116        60
OIR    2025130    131400   -8.7600 -138.2200       8.2        89       116        60
OIR    2025130    131400   -8.7600 -138.2300       8.1        89       115        60
OIR    2025130    131400   -8.7600 -138.2400       8.1        91       112        60
OIR    2025130    131400   -8.7600 -138.2500       8.0        93       109        60
OIR    2025130    131400   -8.7600 -138.2600       7.8        96       109        60
OIR    2025130    131400   -8.7600 -138.2700       7.6        96       109        60
OIR    2025130    131400   -8.7600 -138.2800       7.5        95       108        60
OIR    2025130    131400   -8.7600 -138.2900       7.3        94       108        60
OIR    2025130    131400   -8.7600 -138.3000       7.1        94       108        60
OIR    2025130    131400   -8.7600 -138.3100       6.9        95       109        60
OIR    2025130    131400   -8.7600 -138.3200       6.7        96       112        60
OIR    2025130    131400   -8.7600 -138.3300       6.4        97       111        60
OIR    2025130    131400   -8.7600 -138.3400       6.2        98       110        60
OIR    2025130    131400   -8.7600 -138.3500       6.0        99       110        60
OIR    2025130    131400   -8.7600 -138.3600       5.8        99       110        60
OIR    2025130    131400   -8.7600 -138.3700       5.5        98       111        60
OIR    2025130    131400   -8.7600 -138.3800       5.2        97       111        60
OIR    2025130    131400   -8.7600 -138.3900       4.9        96       109        60
OIR    2025130    131400   -8.7600 -138.4000       4.6        95       109        60
OIR    2025130    131400   -8.7600 -138.4100       4.2        94       109        60
OIR    2025130    131400   -8.7600 -138.7700       4.2       328       136        60
OIR    2025130    131400   -8.7600 -138.7800       4.4       325       137        60
OIR    2025130    131400   -8.7600 -138.7900       4.4       324       136        60
OIR    2025130    131400   -8.7600 -138.8000       4.4       322       133        60
OIR    2025130    131400   -8.7600 -138.8100       4.7       315       130        60
OIR    2025130    131400   -8.7600 -138.8200       4.2       321       133        60
OIR    2025130    131400   -8.7700 -136.8800      16.1       120       145        60
OIR    2025130    131400   -8.7700 -136.8900      15.9       121       144        60
OIR    2025130    131400   -8.7700 -136.9000      15.7       121       144        60
OIR    2025130    131400   -8.7700 -136.9300      15.5       123       141        60
OIR    2025130    131400   -8.7700 -136.9400      15.5       123       139        60
OIR    2025130    131400   -8.7700 -136.9500      15.6       124       137        60
OIR    2025130    131400   -8.7700 -136.9600      15.7       125       135        60
OIR    2025130    131400   -8.7700 -136.9700      15.7       127       133        60
OIR    2025130    131400   -8.7700 -136.9800      15.8       128       131        60
OIR    2025130    131400   -8.7700 -136.9900      15.7       129       130        60
OIR    2025130    131400   -8.7700 -137.0000      15.6       128       130        60
OIR    2025130    131400   -8.7700 -137.0100      15.6       128       130        60
OIR    2025130    131400   -8.7700 -137.0200      15.5       128       130        60
OIR    2025130    131400   -8.7700 -137.0300      15.4       127       130        60
OIR    2025130    131400   -8.7700 -137.0400      15.4       127       131        60
OIR    2025130    131400   -8.7700 -137.0500      15.4       127       131        60
OIR    2025130    131400   -8.7700 -137.0600      15.5       127       132        60
OIR    2025130    131400   -8.7700 -137.0700      15.4       127       133        60
OIR    2025130    131400   -8.7700 -137.0800      15.4       126       136        60
OIR    2025130    131400   -8.7700 -137.0900      15.4       126       134        60
OIR    2025130    131400   -8.7700 -137.1000      15.5       126       133        60
OIR    2025130    131400   -8.7700 -137.1100      15.5       125       134        60
OIR    2025130    131400   -8.7700 -137.1200      15.3       123       136        60
OIR    2025130    131400   -8.7700 -137.1300      14.9       121       143        60
OIR    2025130    131400   -8.7700 -138.1300      26.0        96       140        60
OIR    2025130    131400   -8.7700 -138.1400      19.9        95       132        60
OIR    2025130    131400   -8.7700 -138.1500      15.7        93       127        60
OIR    2025130    131400   -8.7700 -138.1600      10.1        94       124        60
OIR    2025130    131400   -8.7700 -138.1700       8.7        90       121        60
OIR    2025130    131400   -8.7700 -138.1800       8.3        88       119        60
OIR    2025130    131400   -8.7700 -138.1900       8.2        87       116        60
OIR    2025130    131400   -8.7700 -138.2000       8.2        87       116        60
OIR    2025130    131400   -8.7700 -138.2100       8.2        88       115        60
OIR    2025130    131400   -8.7700 -138.2200       8.2        88       114        60
OIR    2025130    131400   -8.7700 -138.2300       8.2        88       113        60
OIR    2025130    131400   -8.7700 -138.2400       8.1        89       110        60
OIR    2025130    131400   -8.7700 -138.2500       8.1        90       108        60
OIR    2025130    131400   -8.7700 -138.2600       7.9        91       107        60
OIR    2025130    131400   -8.7700 -138.2700       7.8        92       105        60
OIR    2025130    131400   -8.7700 -138.2800       7.6        92       105        60
OIR    2025130    131400   -8.7700 -138.2900       7.4        92       105        60
OIR    2025130    131400   -8.7700 -138.3000       7.3        93       107        60
OIR    2025130    131400   -8.7700 -138.3100       7.1        94       109        60
OIR    2025130    131400   -8.7700 -138.3200       6.9        95       110        60
OIR    2025130    131400   -8.7700 -138.3300       6.6        96       110        60
OIR    2025130    131400   -8.7700 -138.3400       6.4        97       109        60
OIR    2025130    131400   -8.7700 -138.3500       6.2        97       109        60
OIR    2025130    131400   -8.7700 -138.3600       6.0        97       110        60
OIR    2025130    131400   -8.7700 -138.3700       5.7        97       111        60
OIR    2025130    131400   -8.7700 -138.3800       5.4        96       111        60
OIR    2025130    131400   -8.7700 -138.3900       5.0        94       108        60
OIR    2025130    131400   -8.7700 -138.4000       4.7        92       107        60
OIR    2025130    131400   -8.7700 -138.4100       4.3        90       107        60
OIR    2025130    131400   -8.7700 -138.4200       4.0        88       108        60
OIR    2025130    131400   -8.7700 -138.7600       4.3       333       134        60
OIR    2025130    131400   -8.7700 -138.7700       4.6       330       135        60
OIR    2025130    131400   -8.7700 -138.7800       4.8       327       136        60
OIR    2025130    131400   -8.7700 -138.7900       4.9       324       136        60
OIR    2025130    131400   -8.7700 -138.8000       4.9       323       133        60
OIR    2025130    131400   -8.7700 -138.8100       5.4       313       129        60
OIR    2025130    131400   -8.7700 -138.8200       4.7       319       132        60
OIR    2025130    131400   -8.7800 -136.8800      16.0       120       144        60
OIR    2025130    131400   -8.7800 -136.8900      15.8       121       145        60
OIR    2025130    131400   -8.7800 -136.9000      15.6       121       145        60
OIR    2025130    131400   -8.7800 -136.9100      15.5       122       145        60
OIR    2025130    131400   -8.7800 -136.9200      15.5       122       144        60
OIR    2025130    131400   -8.7800 -136.9300      15.5       122       142        60
OIR    2025130    131400   -8.7800 -136.9400      15.5       122       140        60
OIR    2025130    131400   -8.7800 -136.9500      15.5       122       137        60
OIR    2025130    131400   -8.7800 -136.9600      15.5       123       135        60
OIR    2025130    131400   -8.7800 -136.9700      15.5       123       134        60
OIR    2025130    131400   -8.7800 -136.9800      15.4       123       132        60
OIR    2025130    131400   -8.7800 -136.9900      15.3       123       130        60
OIR    2025130    131400   -8.7800 -137.0000      15.3       123       129        60
OIR    2025130    131400   -8.7800 -137.0100      15.2       122       128        60
OIR    2025130    131400   -8.7800 -137.0200      15.2       122       128        60
OIR    2025130    131400   -8.7800 -137.0300      15.2       122       128        60
OIR    2025130    131400   -8.7800 -137.0400      15.2       122       129        60
OIR    2025130    131400   -8.7800 -137.0500      15.2       122       129        60
OIR    2025130    131400   -8.7800 -137.0600      15.2       122       129        60
OIR    2025130    131400   -8.7800 -137.0700      15.3       122       131        60
OIR    2025130    131400   -8.7800 -137.0800      15.3       123       133        60
OIR    2025130    131400   -8.7800 -137.0900      15.4       124       132        60
OIR    2025130    131400   -8.7800 -137.1000      15.4       124       131        60
OIR    2025130    131400   -8.7800 -137.1100      15.4       123       131        60
OIR    2025130    131400   -8.7800 -137.1200      15.2       122       131        60
OIR    2025130    131400   -8.7800 -137.1300      15.0       121       134        60
OIR    2025130    131400   -8.7800 -137.1400      14.9       121       137        60
OIR    2025130    131400   -8.7800 -137.1500      14.8       120       139        60
OIR    2025130    131400   -8.7800 -137.1600      14.7       120       141        60
OIR    2025130    131400   -8.7800 -137.1700      14.5       120       142        60
OIR    2025130    131400   -8.7800 -138.1200      24.0        94       143        60
OIR    2025130    131400   -8.7800 -138.1300      21.9        93       134        60
OIR    2025130    131400   -8.7800 -138.1400      16.6        95       126        60
OIR    2025130    131400   -8.7800 -138.1500      11.8        92       123        60
OIR    2025130    131400   -8.7800 -138.1600       8.5        89       120        60
OIR    2025130    131400   -8.7800 -138.1700       8.2        87       116        60
OIR    2025130    131400   -8.7800 -138.1800       8.2        87       115        60
OIR    2025130    131400   -8.7800 -138.1900       8.2        87       114        60
OIR    2025130    131400   -8.7800 -138.2000       8.2        87       113        60
OIR    2025130    131400   -8.7800 -138.2100       8.2        87       111        60
OIR    2025130    131400   -8.7800 -138.2200       8.2        88       110        60
OIR    2025130    131400   -8.7800 -138.2300       8.2        88       109        60
OIR    2025130    131400   -8.7800 -138.2400       8.1        88       108        60
OIR    2025130    131400   -8.7800 -138.2500       8.1        89       107        60
OIR    2025130    131400   -8.7800 -138.2600       8.0        89       104        60
OIR    2025130    131400   -8.7800 -138.2700       7.9        90       104        60
OIR    2025130    131400   -8.7800 -138.2800       7.7        90       107        60
OIR    2025130    131400   -8.7800 -138.2900       7.6        90       109        60
OIR    2025130    131400   -8.7800 -138.3000       7.5        91       110        60
OIR    2025130    131400   -8.7800 -138.3100       7.4        91       110        60
OIR    2025130    131400   -8.7800 -138.3200       7.2        92       109        60
OIR    2025130    131400   -8.7800 -138.3300       6.9        93       109        60
OIR    2025130    131400   -8.7800 -138.3400       6.7        94       109        60
OIR    2025130    131400   -8.7800 -138.3500       6.5        95       109        60
OIR    2025130    131400   -8.7800 -138.3600       6.2        95       109        60
OIR    2025130    131400   -8.7800 -138.3700       5.9        93       111        60
OIR    2025130    131400   -8.7800 -138.3800       5.6        93       111        60
OIR    2025130    131400   -8.7800 -138.3900       5.2        91       109        60
OIR    2025130    131400   -8.7800 -138.4000       4.8        88       108        60
OIR    2025130    131400   -8.7800 -138.4100       4.4        86       108        60
OIR    2025130    131400   -8.7800 -138.4200       4.1        83       109        60
OIR    2025130    131400   -8.7800 -138.7400       4.1       341       124        60
OIR    2025130    131400   -8.7800 -138.7500       4.5       339       128        60
OIR    2025130    131400   -8.7800 -138.7600       4.9       337       133        60
OIR    2025130    131400   -8.7800 -138.7700       5.6       330       133        60
OIR    2025130    131400   -8.7800 -138.7800       6.1       326       133        60
OIR    2025130    131400   -8.7800 -138.7900       6.5       322       136        60
OIR    2025130    131400   -8.7800 -138.8000       6.5       318       134        60
OIR    2025130    131400   -8.7800 -138.8100       6.9       308       129        60
OIR    2025130    131400   -8.7800 -138.8200       5.4       317       132        60
OIR    2025130    131400   -8.7900 -136.8700      16.1       120       145        60
OIR    2025130    131400   -8.7900 -136.8800      15.9       120       143        60
OIR    2025130    131400   -8.7900 -136.8900      15.7       121       145        60
OIR    2025130    131400   -8.7900 -136.9000      15.6       121       146        60
OIR    2025130    131400   -8.7900 -136.9100      15.5       121       143        60
OIR    2025130    131400   -8.7900 -136.9200      15.5       122       142        60
OIR    2025130    131400   -8.7900 -136.9300      15.5       122       141        60
OIR    2025130    131400   -8.7900 -136.9400      15.5       122       138        60
OIR    2025130    131400   -8.7900 -136.9500      15.4       122       136        60
OIR    2025130    131400   -8.7900 -136.9600      15.4       122       134        60
OIR    2025130    131400   -8.7900 -136.9700      15.4       122       133        60
OIR    2025130    131400   -8.7900 -136.9800      15.3       122       132        60
OIR    2025130    131400   -8.7900 -136.9900      15.3       122       130        60
OIR    2025130    131400   -8.7900 -137.0000      15.3       122       129        60
OIR    2025130    131400   -8.7900 -137.0100      15.2       122       128        60
OIR    2025130    131400   -8.7900 -137.0200      15.2       122       127        60
OIR    2025130    131400   -8.7900 -137.0300      15.2       122       127        60
OIR    2025130    131400   -8.7900 -137.0400      15.2       121       127        60
OIR    2025130    131400   -8.7900 -137.0500      15.2       121       128        60
OIR    2025130    131400   -8.7900 -137.0600      15.2       121       127        60
OIR    2025130    131400   -8.7900 -137.0700      15.2       122       129        60
OIR    2025130    131400   -8.7900 -137.0800      15.2       122       131        60
OIR    2025130    131400   -8.7900 -137.0900      15.3       122       131        60
OIR    2025130    131400   -8.7900 -137.1000      15.3       122       130        60
OIR    2025130    131400   -8.7900 -137.1100      15.2       121       130        60
OIR    2025130    131400   -8.7900 -137.1200      15.2       121       129        60
OIR    2025130    131400   -8.7900 -137.1300      15.2       121       129        60
OIR    2025130    131400   -8.7900 -137.1400      15.1       121       131        60
OIR    2025130    131400   -8.7900 -137.1500      15.1       121       135        60
OIR    2025130    131400   -8.7900 -137.1600      15.0       121       136        60
OIR    2025130    131400   -8.7900 -137.1700      14.9       121       136        60
OIR    2025130    131400   -8.7900 -137.1800      14.7       121       141        60
OIR    2025130    131400   -8.7900 -137.2100      13.9       125       146        60
OIR    2025130    131400   -8.7900 -138.1100      24.1        89       140        60
OIR    2025130    131400   -8.7900 -138.1200      22.4        91       135        60
OIR    2025130    131400   -8.7900 -138.1300      19.6        93       128        60
OIR    2025130    131400   -8.7900 -138.1400      13.0        94       122        60
OIR    2025130    131400   -8.7900 -138.1500       9.4        89       119        60
OIR    2025130    131400   -8.7900 -138.1600       8.2        87       116        60
OIR    2025130    131400   -8.7900 -138.1700       8.2        87       112        60
OIR    2025130    131400   -8.7900 -138.1800       8.2        87       110        60
OIR    2025130    131400   -8.7900 -138.1900       8.2        87       110        60
OIR    2025130    131400   -8.7900 -138.2000       8.2        87       110        60
OIR    2025130    131400   -8.7900 -138.2100       8.2        87       110        60
OIR    2025130    131400   -8.7900 -138.2200       8.2        87       109        60
OIR    2025130    131400   -8.7900 -138.2300       8.2        88       108        60
OIR    2025130    131400   -8.7900 -138.2400       8.1        88       107        60
OIR    2025130    131400   -8.7900 -138.2500       8.1        88       105        60
OIR    2025130    131400   -8.7900 -138.2600       8.1        88       104        60
OIR    2025130    131400   -8.7900 -138.2700       8.0        88       104        60
OIR    2025130    131400   -8.7900 -138.2800       7.9        89       105        60
OIR    2025130    131400   -8.7900 -138.2900       7.8        89       107        60
OIR    2025130    131400   -8.7900 -138.3000       7.7        89       109        60
OIR    2025130    131400   -8.7900 -138.3100       7.5        90       110        60
OIR    2025130    131400   -8.7900 -138.3200       7.4        90       109        60
OIR    2025130    131400   -8.7900 -138.3300       7.2        91       108        60
OIR    2025130    131400   -8.7900 -138.3400       7.0        92       108        60
OIR    2025130    131400   -8.7900 -138.3500       6.8        92       108        60
OIR    2025130    131400   -8.7900 -138.3600       6.5        92       108        60
OIR    2025130    131400   -8.7900 -138.3700       6.2        91       110        60
OIR    2025130    131400   -8.7900 -138.3800       5.9        89       110        60
OIR    2025130    131400   -8.7900 -138.3900       5.5        86       109        60
OIR    2025130    131400   -8.7900 -138.4000       5.1        84       109        60
OIR    2025130    131400   -8.7900 -138.4100       4.7        80       109        60
OIR    2025130    131400   -8.7900 -138.4200       4.3        76       110        60
OIR    2025130    131400   -8.7900 -138.4300       4.1        72       111        60
OIR    2025130    131400   -8.7900 -138.4400       4.0        69       109        60
OIR    2025130    131400   -8.7900 -138.7300       4.4       347       119        60
OIR    2025130    131400   -8.7900 -138.7400       5.1       345       123        60
OIR    2025130    131400   -8.7900 -138.7500       5.6       342       126        60
OIR    2025130    131400   -8.7900 -138.7600       5.9       338       129        60
OIR    2025130    131400   -8.7900 -138.7700       6.8       329       130        60
OIR    2025130    131400   -8.7900 -138.7800       7.5       323       132        60
OIR    2025130    131400   -8.7900 -138.7900       8.0       319       135        60
OIR    2025130    131400   -8.7900 -138.8000       8.1       314       135        60
OIR    2025130    131400   -8.7900 -138.8100       7.8       308       132        60
OIR    2025130    131400   -8.7900 -138.8200       7.0       311       134        60
OIR    2025130    131400   -8.8000 -136.8700      16.0       120       144        60
OIR    2025130    131400   -8.8000 -136.8800      15.9       120       142        60
OIR    2025130    131400   -8.8000 -136.8900      15.7       121       144        60
OIR    2025130    131400   -8.8000 -136.9000      15.6       121       145        60
OIR    2025130    131400   -8.8000 -136.9100      15.5       121       142        60
OIR    2025130    131400   -8.8000 -136.9200      15.5       121       139        60
OIR    2025130    131400   -8.8000 -136.9300      15.5       122       137        60
OIR    2025130    131400   -8.8000 -136.9400      15.4       122       136        60
OIR    2025130    131400   -8.8000 -136.9500      15.4       122       134        60
OIR    2025130    131400   -8.8000 -136.9600      15.4       122       133        60
OIR    2025130    131400   -8.8000 -136.9700      15.4       122       132        60
OIR    2025130    131400   -8.8000 -136.9800      15.3       122       131        60
OIR    2025130    131400   -8.8000 -136.9900      15.3       122       130        60
OIR    2025130    131400   -8.8000 -137.0000      15.3       122       129        60
OIR    2025130    131400   -8.8000 -137.0100      15.2       122       128        60
OIR    2025130    131400   -8.8000 -137.0200      15.2       122       126        60
OIR    2025130    131400   -8.8000 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8000 -137.0400      15.2       121       127        60
OIR    2025130    131400   -8.8000 -137.0500      15.2       121       126        60
OIR    2025130    131400   -8.8000 -137.0600      15.2       121       126        60
OIR    2025130    131400   -8.8000 -137.0700      15.2       121       127        60
OIR    2025130    131400   -8.8000 -137.0800      15.2       121       129        60
OIR    2025130    131400   -8.8000 -137.0900      15.2       121       129        60
OIR    2025130    131400   -8.8000 -137.1000      15.2       121       130        60
OIR    2025130    131400   -8.8000 -137.1100      15.2       121       129        60
OIR    2025130    131400   -8.8000 -137.1200      15.2       121       129        60
OIR    2025130    131400   -8.8000 -137.1300      15.2       121       128        60
OIR    2025130    131400   -8.8000 -137.1400      15.2       121       129        60
OIR    2025130    131400   -8.8000 -137.1500      15.2       121       131        60
OIR    2025130    131400   -8.8000 -137.1600      15.2       121       133        60
OIR    2025130    131400   -8.8000 -137.1700      15.1       121       134        60
OIR    2025130    131400   -8.8000 -137.1800      15.1       121       137        60
OIR    2025130    131400   -8.8000 -137.1900      14.9       122       141        60
OIR    2025130    131400   -8.8000 -137.2000      14.6       124       142        60
OIR    2025130    131400   -8.8000 -137.2100      14.3       125       144        60
OIR    2025130    131400   -8.8000 -137.2200      14.1       126       144        60
OIR    2025130    131400   -8.8000 -137.2300      13.8       127       146        60
OIR    2025130    131400   -8.8000 -138.1000      34.5        64       135        60
OIR    2025130    131400   -8.8000 -138.1100      23.9        85       129        60
OIR    2025130    131400   -8.8000 -138.1200      20.8        92       126        60
OIR    2025130    131400   -8.8000 -138.1300      17.3        94       122        60
OIR    2025130    131400   -8.8000 -138.1400      10.2        91       117        60
OIR    2025130    131400   -8.8000 -138.1500       8.5        88       116        60
OIR    2025130    131400   -8.8000 -138.1600       8.2        87       113        60
OIR    2025130    131400   -8.8000 -138.1700       8.2        87       107        60
OIR    2025130    131400   -8.8000 -138.1800       8.2        87       104        60
OIR    2025130    131400   -8.8000 -138.1900       8.2        87       104        60
OIR    2025130    131400   -8.8000 -138.2000       8.2        87       107        60
OIR    2025130    131400   -8.8000 -138.2100       8.2        87       109        60
OIR    2025130    131400   -8.8000 -138.2200       8.2        87       109        60
OIR    2025130    131400   -8.8000 -138.2300       8.2        87       108        60
OIR    2025130    131400   -8.8000 -138.2400       8.1        87       107        60
OIR    2025130    131400   -8.8000 -138.2500       8.1        87       105        60
OIR    2025130    131400   -8.8000 -138.2600       8.1        87       104        60
OIR    2025130    131400   -8.8000 -138.2700       8.0        87       104        60
OIR    2025130    131400   -8.8000 -138.2800       8.0        87       103        60
OIR    2025130    131400   -8.8000 -138.2900       7.9        88       104        60
OIR    2025130    131400   -8.8000 -138.3000       7.8        88       107        60
OIR    2025130    131400   -8.8000 -138.3100       7.7        88       108        60
OIR    2025130    131400   -8.8000 -138.3200       7.6        89       108        60
OIR    2025130    131400   -8.8000 -138.3300       7.4        90       107        60
OIR    2025130    131400   -8.8000 -138.3400       7.2        90       104        60
OIR    2025130    131400   -8.8000 -138.3500       7.0        90       105        60
OIR    2025130    131400   -8.8000 -138.3600       6.8        90       107        60
OIR    2025130    131400   -8.8000 -138.3700       6.5        89       108        60
OIR    2025130    131400   -8.8000 -138.3800       6.1        86       108        60
OIR    2025130    131400   -8.8000 -138.3900       5.8        83       109        60
OIR    2025130    131400   -8.8000 -138.4000       5.5        80       110        60
OIR    2025130    131400   -8.8000 -138.4100       5.0        76       111        60
OIR    2025130    131400   -8.8000 -138.4200       4.6        71       110        60
OIR    2025130    131400   -8.8000 -138.4300       4.4        68       108        60
OIR    2025130    131400   -8.8000 -138.4400       4.2        65       108        60
OIR    2025130    131400   -8.8000 -138.4500       4.1        57       109        60
OIR    2025130    131400   -8.8000 -138.4600       4.1        50       107        60
OIR    2025130    131400   -8.8000 -138.4700       4.1        44       107        60
OIR    2025130    131400   -8.8000 -138.4800       4.2        36       107        60
OIR    2025130    131400   -8.8000 -138.4900       4.3        28       108        60
OIR    2025130    131400   -8.8000 -138.5000       4.8        20       110        60
OIR    2025130    131400   -8.8000 -138.5100       5.6        13       109        60
OIR    2025130    131400   -8.8000 -138.5200       6.7         6       107        60
OIR    2025130    131400   -8.8000 -138.5300       6.6         5       108        60
OIR    2025130    131400   -8.8000 -138.5400       6.0         5       110        60
OIR    2025130    131400   -8.8000 -138.5500       5.3         2       110        60
OIR    2025130    131400   -8.8000 -138.5600       4.8       357       111        60
OIR    2025130    131400   -8.8000 -138.5700       4.6       351       111        60
OIR    2025130    131400   -8.8000 -138.5800       4.5       344       111        60
OIR    2025130    131400   -8.8000 -138.5900       4.2       340       111        60
OIR    2025130    131400   -8.8000 -138.7100       4.5       350       112        60
OIR    2025130    131400   -8.8000 -138.7200       5.2       349       115        60
OIR    2025130    131400   -8.8000 -138.7300       5.8       348       117        60
OIR    2025130    131400   -8.8000 -138.7400       6.1       347       122        60
OIR    2025130    131400   -8.8000 -138.7500       6.3       344       124        60
OIR    2025130    131400   -8.8000 -138.7600       6.5       340       126        60
OIR    2025130    131400   -8.8000 -138.7700       8.0       325       128        60
OIR    2025130    131400   -8.8000 -138.7800       8.7       319       130        60
OIR    2025130    131400   -8.8000 -138.7900       9.3       315       134        60
OIR    2025130    131400   -8.8000 -138.8000       9.7       310       136        60
OIR    2025130    131400   -8.8000 -138.8100       9.2       308       135        60
OIR    2025130    131400   -8.8000 -138.8200       8.6       308       137        60
OIR    2025130    131400   -8.8000 -138.8300       8.3       312       143        60
OIR    2025130    131400   -8.8100 -136.8700      16.0       120       145        60
OIR    2025130    131400   -8.8100 -136.8800      15.8       120       142        60
OIR    2025130    131400   -8.8100 -136.8900      15.7       121       142        60
OIR    2025130    131400   -8.8100 -136.9000      15.6       121       142        60
OIR    2025130    131400   -8.8100 -136.9100      15.5       121       140        60
OIR    2025130    131400   -8.8100 -136.9200      15.5       121       138        60
OIR    2025130    131400   -8.8100 -136.9300      15.5       121       137        60
OIR    2025130    131400   -8.8100 -136.9400      15.4       122       135        60
OIR    2025130    131400   -8.8100 -136.9500      15.4       122       134        60
OIR    2025130    131400   -8.8100 -136.9600      15.4       122       133        60
OIR    2025130    131400   -8.8100 -136.9700      15.3       122       132        60
OIR    2025130    131400   -8.8100 -136.9800      15.3       122       131        60
OIR    2025130    131400   -8.8100 -136.9900      15.3       122       130        60
OIR    2025130    131400   -8.8100 -137.0000      15.3       122       129        60
OIR    2025130    131400   -8.8100 -137.0100      15.3       122       129        60
OIR    2025130    131400   -8.8100 -137.0200      15.2       121       126        60
OIR    2025130    131400   -8.8100 -137.0300      15.2       121       125        60
OIR    2025130    131400   -8.8100 -137.0400      15.2       121       126        60
OIR    2025130    131400   -8.8100 -137.0500      15.2       121       125        60
OIR    2025130    131400   -8.8100 -137.0600      15.2       121       124        60
OIR    2025130    131400   -8.8100 -137.0700      15.2       121       125        60
OIR    2025130    131400   -8.8100 -137.0800      15.2       121       127        60
OIR    2025130    131400   -8.8100 -137.0900      15.2       121       129        60
OIR    2025130    131400   -8.8100 -137.1000      15.2       121       130        60
OIR    2025130    131400   -8.8100 -137.1100      15.2       121       130        60
OIR    2025130    131400   -8.8100 -137.1200      15.2       121       130        60
OIR    2025130    131400   -8.8100 -137.1300      15.2       121       129        60
OIR    2025130    131400   -8.8100 -137.1400      15.2       121       129        60
OIR    2025130    131400   -8.8100 -137.1500      15.2       121       131        60
OIR    2025130    131400   -8.8100 -137.1600      15.2       121       132        60
OIR    2025130    131400   -8.8100 -137.1700      15.2       121       134        60
OIR    2025130    131400   -8.8100 -137.1800      15.2       122       135        60
OIR    2025130    131400   -8.8100 -137.1900      15.1       122       136        60
OIR    2025130    131400   -8.8100 -137.2000      14.9       123       138        60
OIR    2025130    131400   -8.8100 -137.2100      14.6       125       139        60
OIR    2025130    131400   -8.8100 -137.2200      14.4       126       139        60
OIR    2025130    131400   -8.8100 -137.2300      14.2       127       141        60
OIR    2025130    131400   -8.8100 -137.2400      14.0       127       144        60
OIR    2025130    131400   -8.8100 -137.5600       6.2        78       146        60
OIR    2025130    131400   -8.8100 -137.5700       6.2        78       144        60
OIR    2025130    131400   -8.8100 -137.5800       6.2        78       142        60
OIR    2025130    131400   -8.8100 -137.5900       6.2        78       141        60
OIR    2025130    131400   -8.8100 -138.0900      39.0        60       145        60
OIR    2025130    131400   -8.8100 -138.1000      35.9        62       132        60
OIR    2025130    131400   -8.8100 -138.1100      19.7        82       126        60
OIR    2025130    131400   -8.8100 -138.1200      17.8        90       122        60
OIR    2025130    131400   -8.8100 -138.1300      15.0        92       120        60
OIR    2025130    131400   -8.8100 -138.1400       9.8        90       119        60
OIR    2025130    131400   -8.8100 -138.1500       8.3        87       114        60
OIR    2025130    131400   -8.8100 -138.1600       8.3        87       110        60
OIR    2025130    131400   -8.8100 -138.1700       8.2        87       108        60
OIR    2025130    131400   -8.8100 -138.1800       8.2        87       105        60
OIR    2025130    131400   -8.8100 -138.1900       8.2        87       104        60
OIR    2025130    131400   -8.8100 -138.2000       8.2        87       105        60
OIR    2025130    131400   -8.8100 -138.2100       8.2        87       109        60
OIR    2025130    131400   -8.8100 -138.2200       8.2        87       109        60
OIR    2025130    131400   -8.8100 -138.2300       8.2        87       109        60
OIR    2025130    131400   -8.8100 -138.2400       8.1        87       109        60
OIR    2025130    131400   -8.8100 -138.2500       8.1        87       109        60
OIR    2025130    131400   -8.8100 -138.2600       8.1        87       105        60
OIR    2025130    131400   -8.8100 -138.2700       8.0        87       104        60
OIR    2025130    131400   -8.8100 -138.2800       8.0        87       104        60
OIR    2025130    131400   -8.8100 -138.2900       8.0        87       104        60
OIR    2025130    131400   -8.8100 -138.3000       7.9        87       104        60
OIR    2025130    131400   -8.8100 -138.3100       7.8        87       105        60
OIR    2025130    131400   -8.8100 -138.3200       7.8        87       107        60
OIR    2025130    131400   -8.8100 -138.3300       7.6        88       105        60
OIR    2025130    131400   -8.8100 -138.3400       7.4        89       104        60
OIR    2025130    131400   -8.8100 -138.3500       7.2        89       104        60
OIR    2025130    131400   -8.8100 -138.3600       7.0        88       104        60
OIR    2025130    131400   -8.8100 -138.3700       6.7        87       104        60
OIR    2025130    131400   -8.8100 -138.3800       6.4        85       105        60
OIR    2025130    131400   -8.8100 -138.3900       6.0        82       105        60
OIR    2025130    131400   -8.8100 -138.4000       5.7        79       107        60
OIR    2025130    131400   -8.8100 -138.4100       5.2        73       108        60
OIR    2025130    131400   -8.8100 -138.4200       4.8        68       107        60
OIR    2025130    131400   -8.8100 -138.4300       4.6        64       107        60
OIR    2025130    131400   -8.8100 -138.4400       4.5        58       107        60
OIR    2025130    131400   -8.8100 -138.4500       4.5        47       108        60
OIR    2025130    131400   -8.8100 -138.4600       4.9        39       108        60
OIR    2025130    131400   -8.8100 -138.4700       5.4        29       108        60
OIR    2025130    131400   -8.8100 -138.4800       6.3        19       109        60
OIR    2025130    131400   -8.8100 -138.4900       8.2         7       110        60
OIR    2025130    131400   -8.8100 -138.5000      12.0       360       112        60
OIR    2025130    131400   -8.8100 -138.5100      14.0       358       111        60
OIR    2025130    131400   -8.8100 -138.5200      14.4       358       109        60
OIR    2025130    131400   -8.8100 -138.5300      13.2       359       109        60
OIR    2025130    131400   -8.8100 -138.5400      11.2       360       109        60
OIR    2025130    131400   -8.8100 -138.5500       9.0       359       109        60
OIR    2025130    131400   -8.8100 -138.5600       7.4       356       109        60
OIR    2025130    131400   -8.8100 -138.5700       6.4       352       109        60
OIR    2025130    131400   -8.8100 -138.5800       6.1       346       109        60
OIR    2025130    131400   -8.8100 -138.5900       6.1       343       109        60
OIR    2025130    131400   -8.8100 -138.6000       5.9       344       108        60
OIR    2025130    131400   -8.8100 -138.6100       5.2       342       107        60
OIR    2025130    131400   -8.8100 -138.6200       4.1       336       104        60
OIR    2025130    131400   -8.8100 -138.6900       4.7       352       108        60
OIR    2025130    131400   -8.8100 -138.7000       5.5       351       109        60
OIR    2025130    131400   -8.8100 -138.7100       6.1       349       110        60
OIR    2025130    131400   -8.8100 -138.7200       6.5       349       113        60
OIR    2025130    131400   -8.8100 -138.7300       6.6       348       116        60
OIR    2025130    131400   -8.8100 -138.7400       6.6       347       122        60
OIR    2025130    131400   -8.8100 -138.7500       6.7       345       125        60
OIR    2025130    131400   -8.8100 -138.7600       6.8       342       127        60
OIR    2025130    131400   -8.8100 -138.7700       9.1       320       130        60
OIR    2025130    131400   -8.8100 -138.7800       9.6       316       131        60
OIR    2025130    131400   -8.8100 -138.7900      10.1       312       132        60
OIR    2025130    131400   -8.8100 -138.8000      10.3       310       132        60
OIR    2025130    131400   -8.8100 -138.8100      10.2       308       132        60
OIR    2025130    131400   -8.8100 -138.8200       9.9       308       133        60
OIR    2025130    131400   -8.8100 -138.8300       9.5       311       135        60
OIR    2025130    131400   -8.8100 -138.8400       9.7       320       142        60
OIR    2025130    131400   -8.8200 -136.8700      16.0       120       145        60
OIR    2025130    131400   -8.8200 -136.8800      15.8       121       142        60
OIR    2025130    131400   -8.8200 -136.8900      15.7       121       140        60
OIR    2025130    131400   -8.8200 -136.9000      15.6       121       139        60
OIR    2025130    131400   -8.8200 -136.9100      15.5       121       139        60
OIR    2025130    131400   -8.8200 -136.9200      15.5       121       139        60
OIR    2025130    131400   -8.8200 -136.9300      15.4       121       137        60
OIR    2025130    131400   -8.8200 -136.9400      15.4       121       136        60
OIR    2025130    131400   -8.8200 -136.9500      15.4       122       134        60
OIR    2025130    131400   -8.8200 -136.9600      15.4       122       133        60
OIR    2025130    131400   -8.8200 -136.9700      15.3       122       132        60
OIR    2025130    131400   -8.8200 -136.9800      15.3       122       130        60
OIR    2025130    131400   -8.8200 -136.9900      15.3       121       129        60
OIR    2025130    131400   -8.8200 -137.0000      15.3       121       130        60
OIR    2025130    131400   -8.8200 -137.0100      15.3       121       130        60
OIR    2025130    131400   -8.8200 -137.0200      15.2       121       127        60
OIR    2025130    131400   -8.8200 -137.0300      15.2       121       125        60
OIR    2025130    131400   -8.8200 -137.0400      15.2       121       124        60
OIR    2025130    131400   -8.8200 -137.0500      15.2       121       124        60
OIR    2025130    131400   -8.8200 -137.0600      15.2       121       123        60
OIR    2025130    131400   -8.8200 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.8200 -137.0800      15.2       121       126        60
OIR    2025130    131400   -8.8200 -137.0900      15.2       121       128        60
OIR    2025130    131400   -8.8200 -137.1000      15.2       121       130        60
OIR    2025130    131400   -8.8200 -137.1100      15.2       121       131        60
OIR    2025130    131400   -8.8200 -137.1200      15.2       121       132        60
OIR    2025130    131400   -8.8200 -137.1300      15.2       121       131        60
OIR    2025130    131400   -8.8200 -137.1400      15.2       121       130        60
OIR    2025130    131400   -8.8200 -137.1500      15.2       121       131        60
OIR    2025130    131400   -8.8200 -137.1600      15.2       121       132        60
OIR    2025130    131400   -8.8200 -137.1700      15.2       121       134        60
OIR    2025130    131400   -8.8200 -137.1800      15.2       122       134        60
OIR    2025130    131400   -8.8200 -137.1900      15.2       122       134        60
OIR    2025130    131400   -8.8200 -137.2000      15.1       122       133        60
OIR    2025130    131400   -8.8200 -137.2100      14.9       124       132        60
OIR    2025130    131400   -8.8200 -137.2200      14.6       125       134        60
OIR    2025130    131400   -8.8200 -137.2300      14.4       126       135        60
OIR    2025130    131400   -8.8200 -137.2400      14.3       127       136        60
OIR    2025130    131400   -8.8200 -137.2500      14.2       127       144        60
OIR    2025130    131400   -8.8200 -137.5400       6.3        79       142        60
OIR    2025130    131400   -8.8200 -137.5500       6.2        78       142        60
OIR    2025130    131400   -8.8200 -137.5600       6.2        78       140        60
OIR    2025130    131400   -8.8200 -137.5700       6.2        78       137        60
OIR    2025130    131400   -8.8200 -137.5800       6.2        78       135        60
OIR    2025130    131400   -8.8200 -137.5900       6.2        79       133        60
OIR    2025130    131400   -8.8200 -137.6000       6.2        79       145        60
OIR    2025130    131400   -8.8200 -138.0900      39.0        63       140        60
OIR    2025130    131400   -8.8200 -138.1000      34.1        63       129        60
OIR    2025130    131400   -8.8200 -138.1100      16.8        81       123        60
OIR    2025130    131400   -8.8200 -138.1200      15.4        88       119        60
OIR    2025130    131400   -8.8200 -138.1300      13.3        91       119        60
OIR    2025130    131400   -8.8200 -138.1400      11.8        90       119        60
OIR    2025130    131400   -8.8200 -138.1500       8.5        88       113        60
OIR    2025130    131400   -8.8200 -138.1600       8.3        88       108        60
OIR    2025130    131400   -8.8200 -138.1700       8.2        87       108        60
OIR    2025130    131400   -8.8200 -138.1800       8.2        87       107        60
OIR    2025130    131400   -8.8200 -138.1900       8.2        87       105        60
OIR    2025130    131400   -8.8200 -138.2000       8.2        87       105        60
OIR    2025130    131400   -8.8200 -138.2100       8.2        87       109        60
OIR    2025130    131400   -8.8200 -138.2200       8.2        87       110        60
OIR    2025130    131400   -8.8200 -138.2300       8.1        87       110        60
OIR    2025130    131400   -8.8200 -138.2400       8.1        87       110        60
OIR    2025130    131400   -8.8200 -138.2500       8.1        87       111        60
OIR    2025130    131400   -8.8200 -138.2600       8.1        87       108        60
OIR    2025130    131400   -8.8200 -138.2700       8.1        86       104        60
OIR    2025130    131400   -8.8200 -138.2800       8.0        86       104        60
OIR    2025130    131400   -8.8200 -138.2900       8.0        86       104        60
OIR    2025130    131400   -8.8200 -138.3000       8.0        86       104        60
OIR    2025130    131400   -8.8200 -138.3100       7.9        86       104        60
OIR    2025130    131400   -8.8200 -138.3200       7.9        86       107        60
OIR    2025130    131400   -8.8200 -138.3300       7.8        86       105        60
OIR    2025130    131400   -8.8200 -138.3400       7.7        87       104        60
OIR    2025130    131400   -8.8200 -138.3500       7.5        86       104        60
OIR    2025130    131400   -8.8200 -138.3600       7.3        86       103        60
OIR    2025130    131400   -8.8200 -138.3700       7.0        85       103        60
OIR    2025130    131400   -8.8200 -138.3800       6.7        83       103        60
OIR    2025130    131400   -8.8200 -138.3900       6.2        80       103        60
OIR    2025130    131400   -8.8200 -138.4000       5.9        76       104        60
OIR    2025130    131400   -8.8200 -138.4100       5.4        69       104        60
OIR    2025130    131400   -8.8200 -138.4200       5.1        62       104        60
OIR    2025130    131400   -8.8200 -138.4300       4.9        56       105        60
OIR    2025130    131400   -8.8200 -138.4400       5.0        48       105        60
OIR    2025130    131400   -8.8200 -138.4500       5.4        36       107        60
OIR    2025130    131400   -8.8200 -138.4600       6.3        27       108        60
OIR    2025130    131400   -8.8200 -138.4700       7.9        16       109        60
OIR    2025130    131400   -8.8200 -138.4800      10.4         5       110        60
OIR    2025130    131400   -8.8200 -138.4900      13.9       358       111        60
OIR    2025130    131400   -8.8200 -138.5000      15.6       357       114        60
OIR    2025130    131400   -8.8200 -138.5100      15.9       357       113        60
OIR    2025130    131400   -8.8200 -138.5200      15.8       357       110        60
OIR    2025130    131400   -8.8200 -138.5300      15.4       358       109        60
OIR    2025130    131400   -8.8200 -138.5400      14.4       359       108        60
OIR    2025130    131400   -8.8200 -138.5500      12.6       358       107        60
OIR    2025130    131400   -8.8200 -138.5600      10.6       357       107        60
OIR    2025130    131400   -8.8200 -138.5700       9.1       354       107        60
OIR    2025130    131400   -8.8200 -138.5800       8.4       349       107        60
OIR    2025130    131400   -8.8200 -138.5900       8.3       347       107        60
OIR    2025130    131400   -8.8200 -138.6000       8.0       347       105        60
OIR    2025130    131400   -8.8200 -138.6100       7.5       347       104        60
OIR    2025130    131400   -8.8200 -138.6200       6.5       343       104        60
OIR    2025130    131400   -8.8200 -138.6300       5.4       340       103        60
OIR    2025130    131400   -8.8200 -138.6400       4.6       340       103        60
OIR    2025130    131400   -8.8200 -138.6500       4.0       341       103        60
OIR    2025130    131400   -8.8200 -138.6600       4.0       344       103        60
OIR    2025130    131400   -8.8200 -138.6700       4.4       348       103        60
OIR    2025130    131400   -8.8200 -138.6800       5.2       350       105        60
OIR    2025130    131400   -8.8200 -138.6900       6.0       351       107        60
OIR    2025130    131400   -8.8200 -138.7000       6.6       350       108        60
OIR    2025130    131400   -8.8200 -138.7100       6.9       348       109        60
OIR    2025130    131400   -8.8200 -138.7200       7.0       348       111        60
OIR    2025130    131400   -8.8200 -138.7300       7.1       348       116        60
OIR    2025130    131400   -8.8200 -138.7400       7.1       347       122        60
OIR    2025130    131400   -8.8200 -138.7500       7.2       346       126        60
OIR    2025130    131400   -8.8200 -138.7600       7.3       345       129        60
OIR    2025130    131400   -8.8200 -138.7700       9.8       319       131        60
OIR    2025130    131400   -8.8200 -138.7800      10.2       315       132        60
OIR    2025130    131400   -8.8200 -138.7900      10.5       311       129        60
OIR    2025130    131400   -8.8200 -138.8000      10.6       310       128        60
OIR    2025130    131400   -8.8200 -138.8100      10.5       309       129        60
OIR    2025130    131400   -8.8200 -138.8200      10.4       309       129        60
OIR    2025130    131400   -8.8200 -138.8300      10.3       310       128        60
OIR    2025130    131400   -8.8200 -138.8400      10.2       315       134        60
OIR    2025130    131400   -8.8200 -138.8500      10.4       330       144        60
OIR    2025130    131400   -8.8300 -136.8700      16.0       121       144        60
OIR    2025130    131400   -8.8300 -136.8800      15.8       121       142        60
OIR    2025130    131400   -8.8300 -136.8900      15.7       121       140        60
OIR    2025130    131400   -8.8300 -136.9000      15.6       121       138        60
OIR    2025130    131400   -8.8300 -136.9100      15.5       121       138        60
OIR    2025130    131400   -8.8300 -136.9200      15.5       121       137        60
OIR    2025130    131400   -8.8300 -136.9300      15.4       121       137        60
OIR    2025130    131400   -8.8300 -136.9400      15.4       121       136        60
OIR    2025130    131400   -8.8300 -136.9500      15.4       121       133        60
OIR    2025130    131400   -8.8300 -136.9600      15.3       121       132        60
OIR    2025130    131400   -8.8300 -136.9700      15.3       121       132        60
OIR    2025130    131400   -8.8300 -136.9800      15.3       121       131        60
OIR    2025130    131400   -8.8300 -136.9900      15.3       121       130        60
OIR    2025130    131400   -8.8300 -137.0000      15.3       121       130        60
OIR    2025130    131400   -8.8300 -137.0100      15.3       121       130        60
OIR    2025130    131400   -8.8300 -137.0200      15.2       121       127        60
OIR    2025130    131400   -8.8300 -137.0300      15.2       121       125        60
OIR    2025130    131400   -8.8300 -137.0400      15.2       121       125        60
OIR    2025130    131400   -8.8300 -137.0500      15.2       121       124        60
OIR    2025130    131400   -8.8300 -137.0600      15.2       121       123        60
OIR    2025130    131400   -8.8300 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.8300 -137.0800      15.2       121       125        60
OIR    2025130    131400   -8.8300 -137.0900      15.2       121       127        60
OIR    2025130    131400   -8.8300 -137.1000      15.2       121       129        60
OIR    2025130    131400   -8.8300 -137.1100      15.2       121       131        60
OIR    2025130    131400   -8.8300 -137.1200      15.2       121       131        60
OIR    2025130    131400   -8.8300 -137.1300      15.2       121       131        60
OIR    2025130    131400   -8.8300 -137.1400      15.2       121       131        60
OIR    2025130    131400   -8.8300 -137.1500      15.2       121       130        60
OIR    2025130    131400   -8.8300 -137.1600      15.2       121       131        60
OIR    2025130    131400   -8.8300 -137.1700      15.2       121       132        60
OIR    2025130    131400   -8.8300 -137.1800      15.2       122       131        60
OIR    2025130    131400   -8.8300 -137.1900      15.2       122       131        60
OIR    2025130    131400   -8.8300 -137.2000      15.2       122       129        60
OIR    2025130    131400   -8.8300 -137.2100      15.1       123       129        60
OIR    2025130    131400   -8.8300 -137.2200      14.9       124       130        60
OIR    2025130    131400   -8.8300 -137.2300      14.8       125       131        60
OIR    2025130    131400   -8.8300 -137.2400      14.6       125       132        60
OIR    2025130    131400   -8.8300 -137.2500      14.5       126       137        60
OIR    2025130    131400   -8.8300 -137.5400       6.3        81       138        60
OIR    2025130    131400   -8.8300 -137.5500       6.2        79       137        60
OIR    2025130    131400   -8.8300 -137.5600       6.2        79       136        60
OIR    2025130    131400   -8.8300 -137.5700       6.2        79       134        60
OIR    2025130    131400   -8.8300 -137.5800       6.4        81       133        60
OIR    2025130    131400   -8.8300 -137.5900       6.2        83       133        60
OIR    2025130    131400   -8.8300 -137.6000       6.2        83       145        60
OIR    2025130    131400   -8.8300 -138.0900      39.9        63       135        60
OIR    2025130    131400   -8.8300 -138.1000      30.8        68       127        60
OIR    2025130    131400   -8.8300 -138.1100      15.1        84       122        60
OIR    2025130    131400   -8.8300 -138.1200      13.9        89       119        60
OIR    2025130    131400   -8.8300 -138.1300      12.8        92       117        60
OIR    2025130    131400   -8.8300 -138.1400      12.1        92       116        60
OIR    2025130    131400   -8.8300 -138.1500       9.1        90       111        60
OIR    2025130    131400   -8.8300 -138.1600       8.6        88       105        60
OIR    2025130    131400   -8.8300 -138.1700       8.2        87       105        60
OIR    2025130    131400   -8.8300 -138.1800       8.2        87       104        60
OIR    2025130    131400   -8.8300 -138.1900       8.2        87       104        60
OIR    2025130    131400   -8.8300 -138.2000       8.2        87       104        60
OIR    2025130    131400   -8.8300 -138.2100       8.2        87       107        60
OIR    2025130    131400   -8.8300 -138.2200       8.2        87       108        60
OIR    2025130    131400   -8.8300 -138.2300       8.2        87       108        60
OIR    2025130    131400   -8.8300 -138.2400       8.1        86       108        60
OIR    2025130    131400   -8.8300 -138.2500       8.1        86       109        60
OIR    2025130    131400   -8.8300 -138.2600       8.1        86       107        60
OIR    2025130    131400   -8.8300 -138.2700       8.1        86       104        60
OIR    2025130    131400   -8.8300 -138.2800       8.1        86       104        60
OIR    2025130    131400   -8.8300 -138.2900       8.0        86       103        60
OIR    2025130    131400   -8.8300 -138.3000       8.0        86       104        60
OIR    2025130    131400   -8.8300 -138.3100       8.0        86       104        60
OIR    2025130    131400   -8.8300 -138.3200       7.9        86       108        60
OIR    2025130    131400   -8.8300 -138.3300       7.9        86       107        60
OIR    2025130    131400   -8.8300 -138.3400       7.8        86       105        60
OIR    2025130    131400   -8.8300 -138.3500       7.6        86       104        60
OIR    2025130    131400   -8.8300 -138.3600       7.4        85       104        60
OIR    2025130    131400   -8.8300 -138.3700       7.2        85       103        60
OIR    2025130    131400   -8.8300 -138.3800       6.8        82       103        60
OIR    2025130    131400   -8.8300 -138.3900       6.4        78       104        60
OIR    2025130    131400   -8.8300 -138.4000       5.9        73       104        60
OIR    2025130    131400   -8.8300 -138.4100       5.5        65       104        60
OIR    2025130    131400   -8.8300 -138.4200       5.2        57       105        60
OIR    2025130    131400   -8.8300 -138.4300       5.3        48       107        60
OIR    2025130    131400   -8.8300 -138.4400       5.8        37       107        60
OIR    2025130    131400   -8.8300 -138.4500       6.9        23       107        60
OIR    2025130    131400   -8.8300 -138.4600       9.0        14       110        60
OIR    2025130    131400   -8.8300 -138.4700      11.6         5       111        60
OIR    2025130    131400   -8.8300 -138.4800      14.3       359       111        60
OIR    2025130    131400   -8.8300 -138.4900      15.7       357       110        60
OIR    2025130    131400   -8.8300 -138.5000      16.0       357       111        60
OIR    2025130    131400   -8.8300 -138.5100      16.0       357       109        60
OIR    2025130    131400   -8.8300 -138.5200      16.0       357       105        60
OIR    2025130    131400   -8.8300 -138.5300      15.9       357       107        60
OIR    2025130    131400   -8.8300 -138.5400      15.6       358       108        60
OIR    2025130    131400   -8.8300 -138.5500      14.6       358       108        60
OIR    2025130    131400   -8.8300 -138.5600      12.9       357       108        60
OIR    2025130    131400   -8.8300 -138.5700      11.2       355       110        60
OIR    2025130    131400   -8.8300 -138.5800       9.9       352       111        60
OIR    2025130    131400   -8.8300 -138.5900       9.3       349       110        60
OIR    2025130    131400   -8.8300 -138.6000       9.0       349       109        60
OIR    2025130    131400   -8.8300 -138.6100       8.8       349       107        60
OIR    2025130    131400   -8.8300 -138.6200       8.4       348       104        60
OIR    2025130    131400   -8.8300 -138.6300       7.9       345       104        60
OIR    2025130    131400   -8.8300 -138.6400       7.3       345       103        60
OIR    2025130    131400   -8.8300 -138.6500       6.8       346       103        60
OIR    2025130    131400   -8.8300 -138.6600       6.6       349       103        60
OIR    2025130    131400   -8.8300 -138.6700       6.7       351       104        60
OIR    2025130    131400   -8.8300 -138.6800       6.9       351       105        60
OIR    2025130    131400   -8.8300 -138.6900       7.0       350       107        60
OIR    2025130    131400   -8.8300 -138.7000       7.1       349       108        60
OIR    2025130    131400   -8.8300 -138.7100       7.2       348       110        60
OIR    2025130    131400   -8.8300 -138.7200       7.2       347       113        60
OIR    2025130    131400   -8.8300 -138.7300       7.2       347       116        60
OIR    2025130    131400   -8.8300 -138.7400       7.2       347       122        60
OIR    2025130    131400   -8.8300 -138.7500       7.3       347       126        60
OIR    2025130    131400   -8.8300 -138.7600       7.3       346       130        60
OIR    2025130    131400   -8.8300 -138.7700      10.3       315       131        60
OIR    2025130    131400   -8.8300 -138.7800      10.5       313       129        60
OIR    2025130    131400   -8.8300 -138.7900      10.7       310       125        60
OIR    2025130    131400   -8.8300 -138.8000      10.7       310       125        60
OIR    2025130    131400   -8.8300 -138.8100      10.6       310       127        60
OIR    2025130    131400   -8.8300 -138.8200      10.6       309       129        60
OIR    2025130    131400   -8.8300 -138.8300      10.6       309       132        60
OIR    2025130    131400   -8.8300 -138.8400      10.5       311       133        60
OIR    2025130    131400   -8.8300 -138.8500      10.1       326       136        60
OIR    2025130    131400   -8.8300 -138.8600       9.9       335       146        60
OIR    2025130    131400   -8.8400 -136.8600      16.1       121       146        60
OIR    2025130    131400   -8.8400 -136.8700      15.9       121       143        60
OIR    2025130    131400   -8.8400 -136.8800      15.8       121       141        60
OIR    2025130    131400   -8.8400 -136.8900      15.6       121       140        60
OIR    2025130    131400   -8.8400 -136.9000      15.6       121       139        60
OIR    2025130    131400   -8.8400 -136.9100      15.5       121       137        60
OIR    2025130    131400   -8.8400 -136.9200      15.5       121       136        60
OIR    2025130    131400   -8.8400 -136.9300      15.4       121       137        60
OIR    2025130    131400   -8.8400 -136.9400      15.4       121       135        60
OIR    2025130    131400   -8.8400 -136.9500      15.4       121       132        60
OIR    2025130    131400   -8.8400 -136.9600      15.3       121       131        60
OIR    2025130    131400   -8.8400 -136.9700      15.3       121       132        60
OIR    2025130    131400   -8.8400 -136.9800      15.3       121       131        60
OIR    2025130    131400   -8.8400 -136.9900      15.3       121       130        60
OIR    2025130    131400   -8.8400 -137.0000      15.3       121       130        60
OIR    2025130    131400   -8.8400 -137.0100      15.3       121       129        60
OIR    2025130    131400   -8.8400 -137.0200      15.2       121       127        60
OIR    2025130    131400   -8.8400 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8400 -137.0400      15.2       121       126        60
OIR    2025130    131400   -8.8400 -137.0500      15.2       121       125        60
OIR    2025130    131400   -8.8400 -137.0600      15.2       121       123        60
OIR    2025130    131400   -8.8400 -137.0700      15.2       121       123        60
OIR    2025130    131400   -8.8400 -137.0800      15.2       121       124        60
OIR    2025130    131400   -8.8400 -137.0900      15.2       121       126        60
OIR    2025130    131400   -8.8400 -137.1000      15.2       121       127        60
OIR    2025130    131400   -8.8400 -137.1100      15.2       121       130        60
OIR    2025130    131400   -8.8400 -137.1200      15.2       121       131        60
OIR    2025130    131400   -8.8400 -137.1300      15.2       121       131        60
OIR    2025130    131400   -8.8400 -137.1400      15.2       121       131        60
OIR    2025130    131400   -8.8400 -137.1500      15.2       121       130        60
OIR    2025130    131400   -8.8400 -137.1600      15.2       121       129        60
OIR    2025130    131400   -8.8400 -137.1700      15.2       121       128        60
OIR    2025130    131400   -8.8400 -137.1800      15.2       122       128        60
OIR    2025130    131400   -8.8400 -137.1900      15.2       122       127        60
OIR    2025130    131400   -8.8400 -137.2000      15.2       122       127        60
OIR    2025130    131400   -8.8400 -137.2100      15.2       122       127        60
OIR    2025130    131400   -8.8400 -137.2200      15.1       122       128        60
OIR    2025130    131400   -8.8400 -137.2300      15.0       123       129        60
OIR    2025130    131400   -8.8400 -137.2400      14.9       123       129        60
OIR    2025130    131400   -8.8400 -137.2500      14.9       124       131        60
OIR    2025130    131400   -8.8400 -137.2600      14.8       125       133        60
OIR    2025130    131400   -8.8400 -137.2700      14.6       128       138        60
OIR    2025130    131400   -8.8400 -137.2800      14.5       129       143        60
OIR    2025130    131400   -8.8400 -137.5300       6.5        89       144        60
OIR    2025130    131400   -8.8400 -137.5400       6.6        88       135        60
OIR    2025130    131400   -8.8400 -137.5500       5.9        85       133        60
OIR    2025130    131400   -8.8400 -137.5600       6.1        86       132        60
OIR    2025130    131400   -8.8400 -137.5700       6.6        89       131        60
OIR    2025130    131400   -8.8400 -137.5800       6.9        92       132        60
OIR    2025130    131400   -8.8400 -137.5900       6.5        94       133        60
OIR    2025130    131400   -8.8400 -137.6000       6.4        94       145        60
OIR    2025130    131400   -8.8400 -138.0900      41.5        69       131        60
OIR    2025130    131400   -8.8400 -138.1000      28.2        79       125        60
OIR    2025130    131400   -8.8400 -138.1100      14.1        90       122        60
OIR    2025130    131400   -8.8400 -138.1200      13.3        92       120        60
OIR    2025130    131400   -8.8400 -138.1300      12.7        93       117        60
OIR    2025130    131400   -8.8400 -138.1400      12.1        93       115        60
OIR    2025130    131400   -8.8400 -138.1500      10.4        93       110        60
OIR    2025130    131400   -8.8400 -138.1600       9.0        90       104        60
OIR    2025130    131400   -8.8400 -138.1700       8.2        87       104        60
OIR    2025130    131400   -8.8400 -138.1800       8.2        87       103        60
OIR    2025130    131400   -8.8400 -138.1900       8.2        87       104        60
OIR    2025130    131400   -8.8400 -138.2000       8.2        87       104        60
OIR    2025130    131400   -8.8400 -138.2100       8.2        87       105        60
OIR    2025130    131400   -8.8400 -138.2200       8.2        86       105        60
OIR    2025130    131400   -8.8400 -138.2300       8.2        86       105        60
OIR    2025130    131400   -8.8400 -138.2400       8.1        86       107        60
OIR    2025130    131400   -8.8400 -138.2500       8.1        86       107        60
OIR    2025130    131400   -8.8400 -138.2600       8.1        85       105        60
OIR    2025130    131400   -8.8400 -138.2700       8.1        85       104        60
OIR    2025130    131400   -8.8400 -138.2800       8.1        85       103        60
OIR    2025130    131400   -8.8400 -138.2900       8.0        85       103        60
OIR    2025130    131400   -8.8400 -138.3000       8.0        85       103        60
OIR    2025130    131400   -8.8400 -138.3100       8.0        85       104        60
OIR    2025130    131400   -8.8400 -138.3200       8.0        85       108        60
OIR    2025130    131400   -8.8400 -138.3300       7.9        85       108        60
OIR    2025130    131400   -8.8400 -138.3400       7.9        85       107        60
OIR    2025130    131400   -8.8400 -138.3500       7.7        85       105        60
OIR    2025130    131400   -8.8400 -138.3600       7.6        85       104        60
OIR    2025130    131400   -8.8400 -138.3700       7.3        84       104        60
OIR    2025130    131400   -8.8400 -138.3800       6.9        81       103        60
OIR    2025130    131400   -8.8400 -138.3900       6.4        76       104        60
OIR    2025130    131400   -8.8400 -138.4000       6.0        67       104        60
OIR    2025130    131400   -8.8400 -138.4100       5.6        56       104        60
OIR    2025130    131400   -8.8400 -138.4200       5.8        44       105        60
OIR    2025130    131400   -8.8400 -138.4300       6.5        31       107        60
OIR    2025130    131400   -8.8400 -138.4400       7.9        21       107        60
OIR    2025130    131400   -8.8400 -138.4500      10.3         9       107        60
OIR    2025130    131400   -8.8400 -138.4600      12.9         4       111        60
OIR    2025130    131400   -8.8400 -138.4700      14.8       360       112        60
OIR    2025130    131400   -8.8400 -138.4800      15.8       357       111        60
OIR    2025130    131400   -8.8400 -138.4900      16.1       357       109        60
OIR    2025130    131400   -8.8400 -138.5000      16.1       357       108        60
OIR    2025130    131400   -8.8400 -138.5100      16.1       357       104        60
OIR    2025130    131400   -8.8400 -138.5200      16.0       357       103        60
OIR    2025130    131400   -8.8400 -138.5300      16.0       357       104        60
OIR    2025130    131400   -8.8400 -138.5400      15.9       357       107        60
OIR    2025130    131400   -8.8400 -138.5500      15.4       357       108        60
OIR    2025130    131400   -8.8400 -138.5600      14.3       357       110        60
OIR    2025130    131400   -8.8400 -138.5700      12.9       356       113        60
OIR    2025130    131400   -8.8400 -138.5800      11.6       354       114        60
OIR    2025130    131400   -8.8400 -138.5900      11.2       351       113        60
OIR    2025130    131400   -8.8400 -138.6000      11.0       350       112        60
OIR    2025130    131400   -8.8400 -138.6100      10.7       350       109        60
OIR    2025130    131400   -8.8400 -138.6200      10.3       350       105        60
OIR    2025130    131400   -8.8400 -138.6300       9.9       348       104        60
OIR    2025130    131400   -8.8400 -138.6400       9.4       348       104        60
OIR    2025130    131400   -8.8400 -138.6500       9.0       349       103        60
OIR    2025130    131400   -8.8400 -138.6600       8.7       350       104        60
OIR    2025130    131400   -8.8400 -138.6700       8.6       351       104        60
OIR    2025130    131400   -8.8400 -138.6800       8.6       350       105        60
OIR    2025130    131400   -8.8400 -138.6900       8.4       349       108        60
OIR    2025130    131400   -8.8400 -138.7000       8.1       348       109        60
OIR    2025130    131400   -8.8400 -138.7100       7.9       346       111        60
OIR    2025130    131400   -8.8400 -138.7200       7.6       346       115        60
OIR    2025130    131400   -8.8400 -138.7300       7.5       347       117        60
OIR    2025130    131400   -8.8400 -138.7400       7.4       347       121        60
OIR    2025130    131400   -8.8400 -138.7500       7.4       346       126        60
OIR    2025130    131400   -8.8400 -138.7600       7.4       346       130        60
OIR    2025130    131400   -8.8400 -138.7700      10.6       311       130        60
OIR    2025130    131400   -8.8400 -138.7800      10.7       311       128        60
OIR    2025130    131400   -8.8400 -138.7900      10.7       310       123        60
OIR    2025130    131400   -8.8400 -138.8000      10.7       310       123        60
OIR    2025130    131400   -8.8400 -138.8100      10.7       310       126        60
OIR    2025130    131400   -8.8400 -138.8200      10.6       310       129        60
OIR    2025130    131400   -8.8400 -138.8300      10.6       310       133        60
OIR    2025130    131400   -8.8400 -138.8400      10.6       310       132        60
OIR    2025130    131400   -8.8400 -138.8500      10.2       317       131        60
OIR    2025130    131400   -8.8400 -138.8600       9.3       332       142        60
OIR    2025130    131400   -8.8500 -136.5600      28.2       109       144        60
OIR    2025130    131400   -8.8500 -136.5700      28.0       110       142        60
OIR    2025130    131400   -8.8500 -136.5800      27.7       110       142        60
OIR    2025130    131400   -8.8500 -136.5900      27.5       111       142        60
OIR    2025130    131400   -8.8500 -136.6000      27.3       111       142        60
OIR    2025130    131400   -8.8500 -136.6100      27.2       111       141        60
OIR    2025130    131400   -8.8500 -136.6200      27.0       111       140        60
OIR    2025130    131400   -8.8500 -136.6300      26.8       110       141        60
OIR    2025130    131400   -8.8500 -136.6400      26.4       110       143        60
OIR    2025130    131400   -8.8500 -136.8400      16.3       121       146        60
OIR    2025130    131400   -8.8500 -136.8500      16.1       121       144        60
OIR    2025130    131400   -8.8500 -136.8600      16.0       121       142        60
OIR    2025130    131400   -8.8500 -136.8700      15.9       121       139        60
OIR    2025130    131400   -8.8500 -136.8800      15.8       121       138        60
OIR    2025130    131400   -8.8500 -136.8900      15.6       121       137        60
OIR    2025130    131400   -8.8500 -136.9000      15.5       121       136        60
OIR    2025130    131400   -8.8500 -136.9100      15.5       121       135        60
OIR    2025130    131400   -8.8500 -136.9200      15.4       121       134        60
OIR    2025130    131400   -8.8500 -136.9300      15.4       121       134        60
OIR    2025130    131400   -8.8500 -136.9400      15.4       121       133        60
OIR    2025130    131400   -8.8500 -136.9500      15.4       121       132        60
OIR    2025130    131400   -8.8500 -136.9600      15.3       121       131        60
OIR    2025130    131400   -8.8500 -136.9700      15.3       121       131        60
OIR    2025130    131400   -8.8500 -136.9800      15.3       121       131        60
OIR    2025130    131400   -8.8500 -136.9900      15.3       121       131        60
OIR    2025130    131400   -8.8500 -137.0000      15.3       121       129        60
OIR    2025130    131400   -8.8500 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.8500 -137.0200      15.2       121       127        60
OIR    2025130    131400   -8.8500 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8500 -137.0400      15.2       121       125        60
OIR    2025130    131400   -8.8500 -137.0500      15.2       121       124        60
OIR    2025130    131400   -8.8500 -137.0600      15.2       121       123        60
OIR    2025130    131400   -8.8500 -137.0700      15.2       121       123        60
OIR    2025130    131400   -8.8500 -137.0800      15.2       121       124        60
OIR    2025130    131400   -8.8500 -137.0900      15.2       121       125        60
OIR    2025130    131400   -8.8500 -137.1000      15.2       121       126        60
OIR    2025130    131400   -8.8500 -137.1100      15.2       121       128        60
OIR    2025130    131400   -8.8500 -137.1200      15.2       121       130        60
OIR    2025130    131400   -8.8500 -137.1300      15.2       121       131        60
OIR    2025130    131400   -8.8500 -137.1400      15.2       121       131        60
OIR    2025130    131400   -8.8500 -137.1500      15.2       121       130        60
OIR    2025130    131400   -8.8500 -137.1600      15.2       121       128        60
OIR    2025130    131400   -8.8500 -137.1700      15.2       121       126        60
OIR    2025130    131400   -8.8500 -137.1800      15.2       121       126        60
OIR    2025130    131400   -8.8500 -137.1900      15.2       122       125        60
OIR    2025130    131400   -8.8500 -137.2000      15.2       122       124        60
OIR    2025130    131400   -8.8500 -137.2100      15.2       122       125        60
OIR    2025130    131400   -8.8500 -137.2200      15.1       122       125        60
OIR    2025130    131400   -8.8500 -137.2300      15.1       122       127        60
OIR    2025130    131400   -8.8500 -137.2400      15.1       123       128        60
OIR    2025130    131400   -8.8500 -137.2500      15.0       123       130        60
OIR    2025130    131400   -8.8500 -137.2600      15.0       123       133        60
OIR    2025130    131400   -8.8500 -137.2700      14.9       124       136        60
OIR    2025130    131400   -8.8500 -137.2800      14.7       127       138        60
OIR    2025130    131400   -8.8500 -137.2900      14.6       129       141        60
OIR    2025130    131400   -8.8500 -137.3000      14.5       131       144        60
OIR    2025130    131400   -8.8500 -137.5300       7.2        99       145        60
OIR    2025130    131400   -8.8500 -137.5400       7.3        99       135        60
OIR    2025130    131400   -8.8500 -137.5500       6.2        98       133        60
OIR    2025130    131400   -8.8500 -137.5600       6.6        99       132        60
OIR    2025130    131400   -8.8500 -137.5700       7.3       103       131        60
OIR    2025130    131400   -8.8500 -137.5800       7.8       106       133        60
OIR    2025130    131400   -8.8500 -137.5900       7.7       110       137        60
OIR    2025130    131400   -8.8500 -137.6000       7.6       112       144        60
OIR    2025130    131400   -8.8500 -138.0900      42.4        81       136        60
OIR    2025130    131400   -8.8500 -138.1000      28.0        87       126        60
OIR    2025130    131400   -8.8500 -138.1100      13.5        94       121        60
OIR    2025130    131400   -8.8500 -138.1200      13.0        94       117        60
OIR    2025130    131400   -8.8500 -138.1300      12.6        94       114        60
OIR    2025130    131400   -8.8500 -138.1400      12.1        94       110        60
OIR    2025130    131400   -8.8500 -138.1500      11.0        93       105        60
OIR    2025130    131400   -8.8500 -138.1600       9.6        91       104        60
OIR    2025130    131400   -8.8500 -138.1700       8.3        87       104        60
OIR    2025130    131400   -8.8500 -138.1800       8.3        87       104        60
OIR    2025130    131400   -8.8500 -138.1900       8.2        87       103        60
OIR    2025130    131400   -8.8500 -138.2000       8.2        86       104        60
OIR    2025130    131400   -8.8500 -138.2100       8.2        86       104        60
OIR    2025130    131400   -8.8500 -138.2200       8.2        86       105        60
OIR    2025130    131400   -8.8500 -138.2300       8.2        86       107        60
OIR    2025130    131400   -8.8500 -138.2400       8.1        85       105        60
OIR    2025130    131400   -8.8500 -138.2500       8.1        85       104        60
OIR    2025130    131400   -8.8500 -138.2600       8.1        85       104        60
OIR    2025130    131400   -8.8500 -138.2700       8.1        85       103        60
OIR    2025130    131400   -8.8500 -138.2800       8.1        85       103        60
OIR    2025130    131400   -8.8500 -138.2900       8.1        85       103        60
OIR    2025130    131400   -8.8500 -138.3000       8.0        85       103        60
OIR    2025130    131400   -8.8500 -138.3100       8.0        85       104        60
OIR    2025130    131400   -8.8500 -138.3200       8.0        85       104        60
OIR    2025130    131400   -8.8500 -138.3300       8.0        84       104        60
OIR    2025130    131400   -8.8500 -138.3400       7.9        84       104        60
OIR    2025130    131400   -8.8500 -138.3500       7.9        84       104        60
OIR    2025130    131400   -8.8500 -138.3600       7.7        84       103        60
OIR    2025130    131400   -8.8500 -138.3700       7.4        83       103        60
OIR    2025130    131400   -8.8500 -138.3800       6.9        78       103        60
OIR    2025130    131400   -8.8500 -138.3900       6.3        68       103        60
OIR    2025130    131400   -8.8500 -138.4000       6.1        53       104        60
OIR    2025130    131400   -8.8500 -138.4100       6.4        37       104        60
OIR    2025130    131400   -8.8500 -138.4200       7.4        24       104        60
OIR    2025130    131400   -8.8500 -138.4300       8.9        15       105        60
OIR    2025130    131400   -8.8500 -138.4400      11.1         8       107        60
OIR    2025130    131400   -8.8500 -138.4500      13.8         2       107        60
OIR    2025130    131400   -8.8500 -138.4600      15.4       359       109        60
OIR    2025130    131400   -8.8500 -138.4700      16.0       358       110        60
OIR    2025130    131400   -8.8500 -138.4800      16.1       357       110        60
OIR    2025130    131400   -8.8500 -138.4900      16.1       357       109        60
OIR    2025130    131400   -8.8500 -138.5000      16.1       357       104        60
OIR    2025130    131400   -8.8500 -138.5100      16.1       357       104        60
OIR    2025130    131400   -8.8500 -138.5200      16.1       357       103        60
OIR    2025130    131400   -8.8500 -138.5300      16.1       357       104        60
OIR    2025130    131400   -8.8500 -138.5400      16.0       357       107        60
OIR    2025130    131400   -8.8500 -138.5500      15.8       357       109        60
OIR    2025130    131400   -8.8500 -138.5600      15.2       357       112        60
OIR    2025130    131400   -8.8500 -138.5700      14.2       356       114        60
OIR    2025130    131400   -8.8500 -138.5800      13.3       354       114        60
OIR    2025130    131400   -8.8500 -138.5900      12.7       352       113        60
OIR    2025130    131400   -8.8500 -138.6000      12.3       352       111        60
OIR    2025130    131400   -8.8500 -138.6100      12.0       351       108        60
OIR    2025130    131400   -8.8500 -138.6200      11.7       350       105        60
OIR    2025130    131400   -8.8500 -138.6300      11.4       349       104        60
OIR    2025130    131400   -8.8500 -138.6400      10.9       350       104        60
OIR    2025130    131400   -8.8500 -138.6500      10.4       350       103        60
OIR    2025130    131400   -8.8500 -138.6600      10.1       351       104        60
OIR    2025130    131400   -8.8500 -138.6700       9.7       351       104        60
OIR    2025130    131400   -8.8500 -138.6800       9.4       350       104        60
OIR    2025130    131400   -8.8500 -138.6900       9.2       349       105        60
OIR    2025130    131400   -8.8500 -138.7000       9.0       347       108        60
OIR    2025130    131400   -8.8500 -138.7100       8.7       346       111        60
OIR    2025130    131400   -8.8500 -138.7200       8.2       345       115        60
OIR    2025130    131400   -8.8500 -138.7300       7.9       346       119        60
OIR    2025130    131400   -8.8500 -138.7400       7.6       346       122        60
OIR    2025130    131400   -8.8500 -138.7500       7.6       345       126        60
OIR    2025130    131400   -8.8500 -138.7600       7.6       345       130        60
OIR    2025130    131400   -8.8500 -138.7700      10.7       310       130        60
OIR    2025130    131400   -8.8500 -138.7800      10.7       310       129        60
OIR    2025130    131400   -8.8500 -138.7900      10.7       310       123        60
OIR    2025130    131400   -8.8500 -138.8000      10.7       310       123        60
OIR    2025130    131400   -8.8500 -138.8100      10.7       310       127        60
OIR    2025130    131400   -8.8500 -138.8200      10.7       310       129        60
OIR    2025130    131400   -8.8500 -138.8300      10.7       310       130        60
OIR    2025130    131400   -8.8500 -138.8400      10.6       310       131        60
OIR    2025130    131400   -8.8500 -138.8500      10.6       311       132        60
OIR    2025130    131400   -8.8500 -138.8600       9.3       323       142        60
OIR    2025130    131400   -8.8600 -136.5600      28.9       109       142        60
OIR    2025130    131400   -8.8600 -136.5700      28.5       110       139        60
OIR    2025130    131400   -8.8600 -136.5800      28.2       111       140        60
OIR    2025130    131400   -8.8600 -136.5900      28.0       111       140        60
OIR    2025130    131400   -8.8600 -136.6000      27.8       111       138        60
OIR    2025130    131400   -8.8600 -136.6100      27.5       111       136        60
OIR    2025130    131400   -8.8600 -136.6200      27.3       111       135        60
OIR    2025130    131400   -8.8600 -136.6300      27.1       111       136        60
OIR    2025130    131400   -8.8600 -136.6400      26.8       111       140        60
OIR    2025130    131400   -8.8600 -136.6500      26.3       110       143        60
OIR    2025130    131400   -8.8600 -136.8400      16.2       121       143        60
OIR    2025130    131400   -8.8600 -136.8500      16.1       121       140        60
OIR    2025130    131400   -8.8600 -136.8600      16.0       121       138        60
OIR    2025130    131400   -8.8600 -136.8700      15.9       121       136        60
OIR    2025130    131400   -8.8600 -136.8800      15.7       121       135        60
OIR    2025130    131400   -8.8600 -136.8900      15.6       121       134        60
OIR    2025130    131400   -8.8600 -136.9000      15.5       121       133        60
OIR    2025130    131400   -8.8600 -136.9100      15.5       121       133        60
OIR    2025130    131400   -8.8600 -136.9200      15.4       121       133        60
OIR    2025130    131400   -8.8600 -136.9300      15.4       121       133        60
OIR    2025130    131400   -8.8600 -136.9400      15.4       121       132        60
OIR    2025130    131400   -8.8600 -136.9500      15.4       121       132        60
OIR    2025130    131400   -8.8600 -136.9600      15.3       121       131        60
OIR    2025130    131400   -8.8600 -136.9700      15.3       121       131        60
OIR    2025130    131400   -8.8600 -136.9800      15.3       121       131        60
OIR    2025130    131400   -8.8600 -136.9900      15.3       121       131        60
OIR    2025130    131400   -8.8600 -137.0000      15.3       121       129        60
OIR    2025130    131400   -8.8600 -137.0100      15.3       121       127        60
OIR    2025130    131400   -8.8600 -137.0200      15.2       121       127        60
OIR    2025130    131400   -8.8600 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8600 -137.0400      15.2       121       126        60
OIR    2025130    131400   -8.8600 -137.0500      15.2       121       124        60
OIR    2025130    131400   -8.8600 -137.0600      15.2       121       123        60
OIR    2025130    131400   -8.8600 -137.0700      15.2       121       123        60
OIR    2025130    131400   -8.8600 -137.0800      15.2       121       123        60
OIR    2025130    131400   -8.8600 -137.0900      15.2       121       124        60
OIR    2025130    131400   -8.8600 -137.1000      15.2       121       125        60
OIR    2025130    131400   -8.8600 -137.1100      15.2       121       127        60
OIR    2025130    131400   -8.8600 -137.1200      15.2       121       129        60
OIR    2025130    131400   -8.8600 -137.1300      15.2       121       131        60
OIR    2025130    131400   -8.8600 -137.1400      15.2       121       131        60
OIR    2025130    131400   -8.8600 -137.1500      15.2       121       129        60
OIR    2025130    131400   -8.8600 -137.1600      15.2       121       127        60
OIR    2025130    131400   -8.8600 -137.1700      15.2       121       125        60
OIR    2025130    131400   -8.8600 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.8600 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.8600 -137.2000      15.2       122       123        60
OIR    2025130    131400   -8.8600 -137.2100      15.2       122       123        60
OIR    2025130    131400   -8.8600 -137.2200      15.2       122       123        60
OIR    2025130    131400   -8.8600 -137.2300      15.1       122       125        60
OIR    2025130    131400   -8.8600 -137.2400      15.1       122       127        60
OIR    2025130    131400   -8.8600 -137.2500      15.1       122       129        60
OIR    2025130    131400   -8.8600 -137.2600      15.1       123       133        60
OIR    2025130    131400   -8.8600 -137.2700      15.1       123       134        60
OIR    2025130    131400   -8.8600 -137.2800      15.0       124       134        60
OIR    2025130    131400   -8.8600 -137.2900      14.9       126       135        60
OIR    2025130    131400   -8.8600 -137.3000      14.6       129       136        60
OIR    2025130    131400   -8.8600 -137.3100      14.5       130       142        60
OIR    2025130    131400   -8.8600 -137.3200      14.5       131       146        60
OIR    2025130    131400   -8.8600 -137.3300      14.3       131       144        60
OIR    2025130    131400   -8.8600 -137.3400      14.2       130       144        60
OIR    2025130    131400   -8.8600 -137.3500      14.0       128       145        60
OIR    2025130    131400   -8.8600 -137.5400       7.9       106       137        60
OIR    2025130    131400   -8.8600 -137.5500       7.3       107       134        60
OIR    2025130    131400   -8.8600 -137.5600       7.7       108       133        60
OIR    2025130    131400   -8.8600 -137.5700       8.3       113       133        60
OIR    2025130    131400   -8.8600 -137.5800       8.7       116       135        60
OIR    2025130    131400   -8.8600 -137.5900       9.0       119       140        60
OIR    2025130    131400   -8.8600 -137.6000       9.0       120       143        60
OIR    2025130    131400   -8.8600 -137.6100       9.0       119       147        60
OIR    2025130    131400   -8.8600 -138.0900      44.2        85       139        60
OIR    2025130    131400   -8.8600 -138.1000      27.9        86       127        60
OIR    2025130    131400   -8.8600 -138.1100      13.5        95       121        60
OIR    2025130    131400   -8.8600 -138.1200      12.9        95       116        60
OIR    2025130    131400   -8.8600 -138.1300      12.5        95       112        60
OIR    2025130    131400   -8.8600 -138.1400      11.9        95       108        60
OIR    2025130    131400   -8.8600 -138.1500      11.3        94       104        60
OIR    2025130    131400   -8.8600 -138.1600      10.2        92       104        60
OIR    2025130    131400   -8.8600 -138.1700       8.4        87       104        60
OIR    2025130    131400   -8.8600 -138.1800       8.3        87       104        60
OIR    2025130    131400   -8.8600 -138.1900       8.3        86       104        60
OIR    2025130    131400   -8.8600 -138.2000       8.2        86       104        60
OIR    2025130    131400   -8.8600 -138.2100       8.2        86       104        60
OIR    2025130    131400   -8.8600 -138.2200       8.2        86       105        60
OIR    2025130    131400   -8.8600 -138.2300       8.2        85       107        60
OIR    2025130    131400   -8.8600 -138.2400       8.1        85       104        60
OIR    2025130    131400   -8.8600 -138.2500       8.1        85       103        60
OIR    2025130    131400   -8.8600 -138.2600       8.1        85       103        60
OIR    2025130    131400   -8.8600 -138.2700       8.1        84       103        60
OIR    2025130    131400   -8.8600 -138.2800       8.1        84       103        60
OIR    2025130    131400   -8.8600 -138.2900       8.1        84       103        60
OIR    2025130    131400   -8.8600 -138.3000       8.1        84       103        60
OIR    2025130    131400   -8.8600 -138.3100       8.1        84       103        60
OIR    2025130    131400   -8.8600 -138.3200       8.0        84       103        60
OIR    2025130    131400   -8.8600 -138.3300       8.0        84       103        60
OIR    2025130    131400   -8.8600 -138.3400       8.0        84       103        60
OIR    2025130    131400   -8.8600 -138.3500       7.9        83       103        60
OIR    2025130    131400   -8.8600 -138.3600       7.8        83       103        60
OIR    2025130    131400   -8.8600 -138.3700       7.5        80       103        60
OIR    2025130    131400   -8.8600 -138.3800       6.8        71       103        60
OIR    2025130    131400   -8.8600 -138.3900       6.4        53       103        60
OIR    2025130    131400   -8.8600 -138.4000       7.0        34       103        60
OIR    2025130    131400   -8.8600 -138.4100       8.2        21       104        60
OIR    2025130    131400   -8.8600 -138.4200       9.6        12       104        60
OIR    2025130    131400   -8.8600 -138.4300      11.5         6       104        60
OIR    2025130    131400   -8.8600 -138.4400      13.8         2       105        60
OIR    2025130    131400   -8.8600 -138.4500      15.5       359       105        60
OIR    2025130    131400   -8.8600 -138.4600      16.1       358       107        60
OIR    2025130    131400   -8.8600 -138.4700      16.2       357       108        60
OIR    2025130    131400   -8.8600 -138.4800      16.2       357       108        60
OIR    2025130    131400   -8.8600 -138.4900      16.1       357       108        60
OIR    2025130    131400   -8.8600 -138.5000      16.1       357       104        60
OIR    2025130    131400   -8.8600 -138.5100      16.1       357       103        60
OIR    2025130    131400   -8.8600 -138.5200      16.1       357       103        60
OIR    2025130    131400   -8.8600 -138.5300      16.1       357       104        60
OIR    2025130    131400   -8.8600 -138.5400      16.0       357       107        60
OIR    2025130    131400   -8.8600 -138.5500      15.9       357       110        60
OIR    2025130    131400   -8.8600 -138.5600      15.6       357       112        60
OIR    2025130    131400   -8.8600 -138.5700      15.0       356       114        60
OIR    2025130    131400   -8.8600 -138.5800      14.5       354       114        60
OIR    2025130    131400   -8.8600 -138.5900      13.8       353       112        60
OIR    2025130    131400   -8.8600 -138.6000      13.4       353       110        60
OIR    2025130    131400   -8.8600 -138.6100      13.1       352       108        60
OIR    2025130    131400   -8.8600 -138.6200      13.1       351       105        60
OIR    2025130    131400   -8.8600 -138.6300      12.8       351       104        60
OIR    2025130    131400   -8.8600 -138.6400      12.3       351       104        60
OIR    2025130    131400   -8.8600 -138.6500      11.9       351       103        60
OIR    2025130    131400   -8.8600 -138.6600      11.5       351       104        60
OIR    2025130    131400   -8.8600 -138.6700      11.0       351       104        60
OIR    2025130    131400   -8.8600 -138.6800      10.5       350       103        60
OIR    2025130    131400   -8.8600 -138.6900      10.1       348       104        60
OIR    2025130    131400   -8.8600 -138.7000       9.8       346       107        60
OIR    2025130    131400   -8.8600 -138.7100       9.5       345       111        60
OIR    2025130    131400   -8.8600 -138.7200       9.0       344       115        60
OIR    2025130    131400   -8.8600 -138.7300       8.5       344       119        60
OIR    2025130    131400   -8.8600 -138.7400       8.1       344       121        60
OIR    2025130    131400   -8.8600 -138.7500       8.0       342       126        60
OIR    2025130    131400   -8.8600 -138.7600       8.0       339       130        60
OIR    2025130    131400   -8.8600 -138.7700      10.7       310       131        60
OIR    2025130    131400   -8.8600 -138.7800      10.7       310       130        60
OIR    2025130    131400   -8.8600 -138.7900      10.7       310       125        60
OIR    2025130    131400   -8.8600 -138.8000      10.7       310       125        60
OIR    2025130    131400   -8.8600 -138.8100      10.7       310       128        60
OIR    2025130    131400   -8.8600 -138.8200      10.7       310       129        60
OIR    2025130    131400   -8.8600 -138.8300      10.7       310       129        60
OIR    2025130    131400   -8.8600 -138.8400      10.6       310       130        60
OIR    2025130    131400   -8.8600 -138.8500      10.6       310       132        60
OIR    2025130    131400   -8.8600 -138.8600      10.2       312       142        60
OIR    2025130    131400   -8.8700 -136.5600      29.5       109       141        60
OIR    2025130    131400   -8.8700 -136.5700      29.1       110       139        60
OIR    2025130    131400   -8.8700 -136.5800      28.8       111       138        60
OIR    2025130    131400   -8.8700 -136.5900      28.5       111       137        60
OIR    2025130    131400   -8.8700 -136.6000      28.2       112       134        60
OIR    2025130    131400   -8.8700 -136.6100      28.0       112       133        60
OIR    2025130    131400   -8.8700 -136.6200      27.8       112       133        60
OIR    2025130    131400   -8.8700 -136.6300      27.5       112       134        60
OIR    2025130    131400   -8.8700 -136.6400      27.2       111       137        60
OIR    2025130    131400   -8.8700 -136.6500      26.7       111       140        60
OIR    2025130    131400   -8.8700 -136.6600      26.3       111       143        60
OIR    2025130    131400   -8.8700 -136.8300      16.4       121       146        60
OIR    2025130    131400   -8.8700 -136.8400      16.2       121       141        60
OIR    2025130    131400   -8.8700 -136.8500      16.1       121       139        60
OIR    2025130    131400   -8.8700 -136.8600      16.0       121       138        60
OIR    2025130    131400   -8.8700 -136.8700      15.9       121       136        60
OIR    2025130    131400   -8.8700 -136.8800      15.7       121       135        60
OIR    2025130    131400   -8.8700 -136.8900      15.6       121       135        60
OIR    2025130    131400   -8.8700 -136.9000      15.5       121       135        60
OIR    2025130    131400   -8.8700 -136.9100      15.5       121       134        60
OIR    2025130    131400   -8.8700 -136.9200      15.4       121       133        60
OIR    2025130    131400   -8.8700 -136.9300      15.4       121       133        60
OIR    2025130    131400   -8.8700 -136.9400      15.4       121       132        60
OIR    2025130    131400   -8.8700 -136.9500      15.3       121       131        60
OIR    2025130    131400   -8.8700 -136.9600      15.3       121       132        60
OIR    2025130    131400   -8.8700 -136.9700      15.3       121       132        60
OIR    2025130    131400   -8.8700 -136.9800      15.3       121       132        60
OIR    2025130    131400   -8.8700 -136.9900      15.3       121       131        60
OIR    2025130    131400   -8.8700 -137.0000      15.3       121       129        60
OIR    2025130    131400   -8.8700 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.8700 -137.0200      15.2       121       126        60
OIR    2025130    131400   -8.8700 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8700 -137.0400      15.2       121       127        60
OIR    2025130    131400   -8.8700 -137.0500      15.2       121       125        60
OIR    2025130    131400   -8.8700 -137.0600      15.2       121       124        60
OIR    2025130    131400   -8.8700 -137.0700      15.2       121       123        60
OIR    2025130    131400   -8.8700 -137.0800      15.2       121       123        60
OIR    2025130    131400   -8.8700 -137.0900      15.2       121       123        60
OIR    2025130    131400   -8.8700 -137.1000      15.2       121       124        60
OIR    2025130    131400   -8.8700 -137.1100      15.2       121       126        60
OIR    2025130    131400   -8.8700 -137.1200      15.2       121       127        60
OIR    2025130    131400   -8.8700 -137.1300      15.2       121       129        60
OIR    2025130    131400   -8.8700 -137.1400      15.2       121       129        60
OIR    2025130    131400   -8.8700 -137.1500      15.2       121       128        60
OIR    2025130    131400   -8.8700 -137.1600      15.2       121       126        60
OIR    2025130    131400   -8.8700 -137.1700      15.2       121       125        60
OIR    2025130    131400   -8.8700 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.8700 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.8700 -137.2000      15.2       121       122        60
OIR    2025130    131400   -8.8700 -137.2100      15.2       122       122        60
OIR    2025130    131400   -8.8700 -137.2200      15.2       122       123        60
OIR    2025130    131400   -8.8700 -137.2300      15.1       122       124        60
OIR    2025130    131400   -8.8700 -137.2400      15.1       122       125        60
OIR    2025130    131400   -8.8700 -137.2500      15.1       122       127        60
OIR    2025130    131400   -8.8700 -137.2600      15.1       122       131        60
OIR    2025130    131400   -8.8700 -137.2700      15.1       123       133        60
OIR    2025130    131400   -8.8700 -137.2800      15.1       123       133        60
OIR    2025130    131400   -8.8700 -137.2900      15.0       123       134        60
OIR    2025130    131400   -8.8700 -137.3000      14.9       124       134        60
OIR    2025130    131400   -8.8700 -137.3100      14.7       126       137        60
OIR    2025130    131400   -8.8700 -137.3200      14.7       126       139        60
OIR    2025130    131400   -8.8700 -137.3300      14.7       126       138        60
OIR    2025130    131400   -8.8700 -137.3400      14.7       124       138        60
OIR    2025130    131400   -8.8700 -137.3500      14.5       124       140        60
OIR    2025130    131400   -8.8700 -137.3600      14.4       123       143        60
OIR    2025130    131400   -8.8700 -137.5400       8.7       111       147        60
OIR    2025130    131400   -8.8700 -137.5500       8.5       112       143        60
OIR    2025130    131400   -8.8700 -137.5600       8.7       114       140        60
OIR    2025130    131400   -8.8700 -137.5700       9.0       118       138        60
OIR    2025130    131400   -8.8700 -137.5800       9.2       119       139        60
OIR    2025130    131400   -8.8700 -137.5900       9.3       120       143        60
OIR    2025130    131400   -8.8700 -137.6000       9.3       121       147        60
OIR    2025130    131400   -8.8700 -138.0900      45.5        91       137        60
OIR    2025130    131400   -8.8700 -138.1000      28.9        91       126        60
OIR    2025130    131400   -8.8700 -138.1100      13.2        97       120        60
OIR    2025130    131400   -8.8700 -138.1200      12.6        96       115        60
OIR    2025130    131400   -8.8700 -138.1300      12.3        96       112        60
OIR    2025130    131400   -8.8700 -138.1400      11.8        95       108        60
OIR    2025130    131400   -8.8700 -138.1500      11.1        94       105        60
OIR    2025130    131400   -8.8700 -138.1600      10.1        91       104        60
OIR    2025130    131400   -8.8700 -138.1700       8.6        87       104        60
OIR    2025130    131400   -8.8700 -138.1800       8.4        86       104        60
OIR    2025130    131400   -8.8700 -138.1900       8.3        86       104        60
OIR    2025130    131400   -8.8700 -138.2000       8.3        85       104        60
OIR    2025130    131400   -8.8700 -138.2100       8.2        85       104        60
OIR    2025130    131400   -8.8700 -138.2200       8.2        85       105        60
OIR    2025130    131400   -8.8700 -138.2300       8.2        85       105        60
OIR    2025130    131400   -8.8700 -138.2400       8.2        84       104        60
OIR    2025130    131400   -8.8700 -138.2500       8.2        84       103        60
OIR    2025130    131400   -8.8700 -138.2600       8.2        84       103        60
OIR    2025130    131400   -8.8700 -138.2700       8.1        84       103        60
OIR    2025130    131400   -8.8700 -138.2800       8.1        84       103        60
OIR    2025130    131400   -8.8700 -138.2900       8.1        83       103        60
OIR    2025130    131400   -8.8700 -138.3000       8.1        83       103        60
OIR    2025130    131400   -8.8700 -138.3100       8.1        83       103        60
OIR    2025130    131400   -8.8700 -138.3200       8.1        83       103        60
OIR    2025130    131400   -8.8700 -138.3300       8.1        83       103        60
OIR    2025130    131400   -8.8700 -138.3400       8.0        83       103        60
OIR    2025130    131400   -8.8700 -138.3500       8.0        83       103        60
OIR    2025130    131400   -8.8700 -138.3600       7.9        81       103        60
OIR    2025130    131400   -8.8700 -138.3700       7.4        75       103        60
OIR    2025130    131400   -8.8700 -138.3800       6.9        57       103        60
OIR    2025130    131400   -8.8700 -138.3900       7.4        35       103        60
OIR    2025130    131400   -8.8700 -138.4000       8.7        20       104        60
OIR    2025130    131400   -8.8700 -138.4100      10.0        12       104        60
OIR    2025130    131400   -8.8700 -138.4200      11.5         7       104        60
OIR    2025130    131400   -8.8700 -138.4300      13.4         2       104        60
OIR    2025130    131400   -8.8700 -138.4400      15.2         0       104        60
OIR    2025130    131400   -8.8700 -138.4500      16.1       359       105        60
OIR    2025130    131400   -8.8700 -138.4600      16.3       358       107        60
OIR    2025130    131400   -8.8700 -138.4700      16.3       358       107        60
OIR    2025130    131400   -8.8700 -138.4800      16.3       357       107        60
OIR    2025130    131400   -8.8700 -138.4900      16.2       357       107        60
OIR    2025130    131400   -8.8700 -138.5000      16.2       357       104        60
OIR    2025130    131400   -8.8700 -138.5100      16.1       357       104        60
OIR    2025130    131400   -8.8700 -138.5200      16.1       357       103        60
OIR    2025130    131400   -8.8700 -138.5300      16.1       357       104        60
OIR    2025130    131400   -8.8700 -138.5400      16.1       357       107        60
OIR    2025130    131400   -8.8700 -138.5500      16.0       357       110        60
OIR    2025130    131400   -8.8700 -138.5600      15.8       356       112        60
OIR    2025130    131400   -8.8700 -138.5700      15.6       355       113        60
OIR    2025130    131400   -8.8700 -138.5800      15.2       354       113        60
OIR    2025130    131400   -8.8700 -138.5900      14.8       354       111        60
OIR    2025130    131400   -8.8700 -138.6000      14.5       353       109        60
OIR    2025130    131400   -8.8700 -138.6100      14.4       352       107        60
OIR    2025130    131400   -8.8700 -138.6200      14.1       352       104        60
OIR    2025130    131400   -8.8700 -138.6300      13.8       351       103        60
OIR    2025130    131400   -8.8700 -138.6400      13.4       351       104        60
OIR    2025130    131400   -8.8700 -138.6500      13.1       351       104        60
OIR    2025130    131400   -8.8700 -138.6600      12.7       351       104        60
OIR    2025130    131400   -8.8700 -138.6700      12.2       351       103        60
OIR    2025130    131400   -8.8700 -138.6800      11.8       350       104        60
OIR    2025130    131400   -8.8700 -138.6900      11.3       347       104        60
OIR    2025130    131400   -8.8700 -138.7000      11.0       345       107        60
OIR    2025130    131400   -8.8700 -138.7100      10.6       344       110        60
OIR    2025130    131400   -8.8700 -138.7200      10.2       342       115        60
OIR    2025130    131400   -8.8700 -138.7300       9.6       340       117        60
OIR    2025130    131400   -8.8700 -138.7400       9.0       340       120        60
OIR    2025130    131400   -8.8700 -138.7500       8.7       337       127        60
OIR    2025130    131400   -8.8700 -138.7600       8.8       329       133        60
OIR    2025130    131400   -8.8700 -138.7700      10.8       311       133        60
OIR    2025130    131400   -8.8700 -138.7800      10.8       311       131        60
OIR    2025130    131400   -8.8700 -138.7900      10.8       310       129        60
OIR    2025130    131400   -8.8700 -138.8000      10.8       310       128        60
OIR    2025130    131400   -8.8700 -138.8100      10.7       310       128        60
OIR    2025130    131400   -8.8700 -138.8200      10.7       310       128        60
OIR    2025130    131400   -8.8700 -138.8300      10.7       310       129        60
OIR    2025130    131400   -8.8700 -138.8400      10.6       310       130        60
OIR    2025130    131400   -8.8700 -138.8500      10.6       310       131        60
OIR    2025130    131400   -8.8700 -138.8600      10.7       309       143        60
OIR    2025130    131400   -8.8800 -136.5500      30.4       109       143        60
OIR    2025130    131400   -8.8800 -136.5600      30.1       109       141        60
OIR    2025130    131400   -8.8800 -136.5700      29.7       110       139        60
OIR    2025130    131400   -8.8800 -136.5800      29.4       111       137        60
OIR    2025130    131400   -8.8800 -136.5900      29.0       111       134        60
OIR    2025130    131400   -8.8800 -136.6000      28.5       112       132        60
OIR    2025130    131400   -8.8800 -136.6100      28.2       112       132        60
OIR    2025130    131400   -8.8800 -136.6200      28.0       112       131        60
OIR    2025130    131400   -8.8800 -136.6300      27.8       112       132        60
OIR    2025130    131400   -8.8800 -136.6400      27.6       112       134        60
OIR    2025130    131400   -8.8800 -136.6500      27.1       112       138        60
OIR    2025130    131400   -8.8800 -136.6600      26.6       112       141        60
OIR    2025130    131400   -8.8800 -136.8300      16.4       121       145        60
OIR    2025130    131400   -8.8800 -136.8400      16.2       121       140        60
OIR    2025130    131400   -8.8800 -136.8500      16.1       121       139        60
OIR    2025130    131400   -8.8800 -136.8600      15.9       121       138        60
OIR    2025130    131400   -8.8800 -136.8700      15.8       121       137        60
OIR    2025130    131400   -8.8800 -136.8800      15.7       121       136        60
OIR    2025130    131400   -8.8800 -136.8900      15.6       121       136        60
OIR    2025130    131400   -8.8800 -136.9000      15.5       121       136        60
OIR    2025130    131400   -8.8800 -136.9100      15.5       121       135        60
OIR    2025130    131400   -8.8800 -136.9200      15.4       121       134        60
OIR    2025130    131400   -8.8800 -136.9300      15.4       121       133        60
OIR    2025130    131400   -8.8800 -136.9400      15.4       121       132        60
OIR    2025130    131400   -8.8800 -136.9500      15.3       121       130        60
OIR    2025130    131400   -8.8800 -136.9600      15.3       121       132        60
OIR    2025130    131400   -8.8800 -136.9700      15.3       121       133        60
OIR    2025130    131400   -8.8800 -136.9800      15.3       121       132        60
OIR    2025130    131400   -8.8800 -136.9900      15.3       121       131        60
OIR    2025130    131400   -8.8800 -137.0000      15.3       121       130        60
OIR    2025130    131400   -8.8800 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.8800 -137.0200      15.2       121       126        60
OIR    2025130    131400   -8.8800 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8800 -137.0400      15.2       121       127        60
OIR    2025130    131400   -8.8800 -137.0500      15.2       121       126        60
OIR    2025130    131400   -8.8800 -137.0600      15.2       121       125        60
OIR    2025130    131400   -8.8800 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.8800 -137.0800      15.2       121       123        60
OIR    2025130    131400   -8.8800 -137.0900      15.2       121       123        60
OIR    2025130    131400   -8.8800 -137.1000      15.2       121       123        60
OIR    2025130    131400   -8.8800 -137.1100      15.2       121       124        60
OIR    2025130    131400   -8.8800 -137.1200      15.2       121       126        60
OIR    2025130    131400   -8.8800 -137.1300      15.2       121       127        60
OIR    2025130    131400   -8.8800 -137.1400      15.2       121       127        60
OIR    2025130    131400   -8.8800 -137.1500      15.2       121       126        60
OIR    2025130    131400   -8.8800 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.8800 -137.1700      15.2       121       125        60
OIR    2025130    131400   -8.8800 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.8800 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.8800 -137.2000      15.2       121       122        60
OIR    2025130    131400   -8.8800 -137.2100      15.2       121       122        60
OIR    2025130    131400   -8.8800 -137.2200      15.2       122       122        60
OIR    2025130    131400   -8.8800 -137.2300      15.2       122       122        60
OIR    2025130    131400   -8.8800 -137.2400      15.1       122       123        60
OIR    2025130    131400   -8.8800 -137.2500      15.1       122       125        60
OIR    2025130    131400   -8.8800 -137.2600      15.1       122       130        60
OIR    2025130    131400   -8.8800 -137.2700      15.1       122       131        60
OIR    2025130    131400   -8.8800 -137.2800      15.1       122       132        60
OIR    2025130    131400   -8.8800 -137.2900      15.1       122       132        60
OIR    2025130    131400   -8.8800 -137.3000      15.1       122       132        60
OIR    2025130    131400   -8.8800 -137.3100      15.0       123       133        60
OIR    2025130    131400   -8.8800 -137.3200      15.0       123       134        60
OIR    2025130    131400   -8.8800 -137.3300      14.9       123       132        60
OIR    2025130    131400   -8.8800 -137.3400      14.9       123       133        60
OIR    2025130    131400   -8.8800 -137.3500      14.8       123       135        60
OIR    2025130    131400   -8.8800 -137.3600      14.7       122       138        60
OIR    2025130    131400   -8.8800 -137.3700      14.5       121       143        60
OIR    2025130    131400   -8.8800 -137.5600       9.3       119       147        60
OIR    2025130    131400   -8.8800 -137.5700       9.2       120       145        60
OIR    2025130    131400   -8.8800 -137.5800       9.3       120       144        60
OIR    2025130    131400   -8.8800 -137.5900       9.3       121       147        60
OIR    2025130    131400   -8.8800 -138.0900      45.3       100       135        60
OIR    2025130    131400   -8.8800 -138.1000      29.0        97       125        60
OIR    2025130    131400   -8.8800 -138.1100      13.0        98       119        60
OIR    2025130    131400   -8.8800 -138.1200      12.3        98       114        60
OIR    2025130    131400   -8.8800 -138.1300      12.0        97       110        60
OIR    2025130    131400   -8.8800 -138.1400      11.5        96       107        60
OIR    2025130    131400   -8.8800 -138.1500      10.6        93       104        60
OIR    2025130    131400   -8.8800 -138.1600       9.7        90       104        60
OIR    2025130    131400   -8.8800 -138.1700       8.6        86       103        60
OIR    2025130    131400   -8.8800 -138.1800       8.4        85       104        60
OIR    2025130    131400   -8.8800 -138.1900       8.3        85       104        60
OIR    2025130    131400   -8.8800 -138.2000       8.3        85       104        60
OIR    2025130    131400   -8.8800 -138.2100       8.2        85       104        60
OIR    2025130    131400   -8.8800 -138.2200       8.2        84       104        60
OIR    2025130    131400   -8.8800 -138.2300       8.2        84       104        60
OIR    2025130    131400   -8.8800 -138.2400       8.2        84       104        60
OIR    2025130    131400   -8.8800 -138.2500       8.2        84       103        60
OIR    2025130    131400   -8.8800 -138.2600       8.2        83       103        60
OIR    2025130    131400   -8.8800 -138.2700       8.2        83       103        60
OIR    2025130    131400   -8.8800 -138.2800       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.2900       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3000       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3100       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3200       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3300       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3400       8.1        83       103        60
OIR    2025130    131400   -8.8800 -138.3500       8.0        82       103        60
OIR    2025130    131400   -8.8800 -138.3600       8.0        76       103        60
OIR    2025130    131400   -8.8800 -138.3700       8.0        59       103        60
OIR    2025130    131400   -8.8800 -138.3800       8.1        36       103        60
OIR    2025130    131400   -8.8800 -138.3900       9.4        19       103        60
OIR    2025130    131400   -8.8800 -138.4000      11.0        11       103        60
OIR    2025130    131400   -8.8800 -138.4100      12.4         6       104        60
OIR    2025130    131400   -8.8800 -138.4200      13.8         3       104        60
OIR    2025130    131400   -8.8800 -138.4300      14.9         1       103        60
OIR    2025130    131400   -8.8800 -138.4400      15.9       359       104        60
OIR    2025130    131400   -8.8800 -138.4500      16.5       359       104        60
OIR    2025130    131400   -8.8800 -138.4600      16.7       358       105        60
OIR    2025130    131400   -8.8800 -138.4700      16.6       358       105        60
OIR    2025130    131400   -8.8800 -138.4800      16.5       357       105        60
OIR    2025130    131400   -8.8800 -138.4900      16.3       357       104        60
OIR    2025130    131400   -8.8800 -138.5000      16.2       357       104        60
OIR    2025130    131400   -8.8800 -138.5100      16.2       357       104        60
OIR    2025130    131400   -8.8800 -138.5200      16.2       357       104        60
OIR    2025130    131400   -8.8800 -138.5300      16.1       357       104        60
OIR    2025130    131400   -8.8800 -138.5400      16.1       356       105        60
OIR    2025130    131400   -8.8800 -138.5500      16.1       356       109        60
OIR    2025130    131400   -8.8800 -138.5600      16.0       356       111        60
OIR    2025130    131400   -8.8800 -138.5700      15.8       355       112        60
OIR    2025130    131400   -8.8800 -138.5800      15.6       354       112        60
OIR    2025130    131400   -8.8800 -138.5900      15.4       354       109        60
OIR    2025130    131400   -8.8800 -138.6000      15.3       353       108        60
OIR    2025130    131400   -8.8800 -138.6100      15.1       352       105        60
OIR    2025130    131400   -8.8800 -138.6200      14.9       352       104        60
OIR    2025130    131400   -8.8800 -138.6300      14.7       352       104        60
OIR    2025130    131400   -8.8800 -138.6400      14.6       351       104        60
OIR    2025130    131400   -8.8800 -138.6500      14.3       351       104        60
OIR    2025130    131400   -8.8800 -138.6600      13.9       351       104        60
OIR    2025130    131400   -8.8800 -138.6700      13.4       351       103        60
OIR    2025130    131400   -8.8800 -138.6800      13.0       349       104        60
OIR    2025130    131400   -8.8800 -138.6900      12.6       347       104        60
OIR    2025130    131400   -8.8800 -138.7000      12.3       344       105        60
OIR    2025130    131400   -8.8800 -138.7100      11.8       343       109        60
OIR    2025130    131400   -8.8800 -138.7200      11.3       340       114        60
OIR    2025130    131400   -8.8800 -138.7300      10.8       338       117        60
OIR    2025130    131400   -8.8800 -138.7400      10.2       337       120        60
OIR    2025130    131400   -8.8800 -138.7500      10.0       332       126        60
OIR    2025130    131400   -8.8800 -138.7600      10.6       320       133        60
OIR    2025130    131400   -8.8800 -138.7700      11.1       314       132        60
OIR    2025130    131400   -8.8800 -138.7800      11.0       313       131        60
OIR    2025130    131400   -8.8800 -138.7900      11.0       312       132        60
OIR    2025130    131400   -8.8800 -138.8000      10.9       311       131        60
OIR    2025130    131400   -8.8800 -138.8100      10.8       311       129        60
OIR    2025130    131400   -8.8800 -138.8200      10.7       311       129        60
OIR    2025130    131400   -8.8800 -138.8300      10.7       312       129        60
OIR    2025130    131400   -8.8800 -138.8400      10.6       312       129        60
OIR    2025130    131400   -8.8800 -138.8500      10.6       312       130        60
OIR    2025130    131400   -8.8800 -138.8600      10.8       311       143        60
OIR    2025130    131400   -8.8900 -136.5300      31.3       108       144        60
OIR    2025130    131400   -8.8900 -136.5600      30.8       109       142        60
OIR    2025130    131400   -8.8900 -136.5700      30.5       109       139        60
OIR    2025130    131400   -8.8900 -136.5800      30.2       110       137        60
OIR    2025130    131400   -8.8900 -136.5900      29.6       111       135        60
OIR    2025130    131400   -8.8900 -136.6000      28.8       112       135        60
OIR    2025130    131400   -8.8900 -136.6100      28.4       112       134        60
OIR    2025130    131400   -8.8900 -136.6200      28.2       112       132        60
OIR    2025130    131400   -8.8900 -136.6300      27.9       113       133        60
OIR    2025130    131400   -8.8900 -136.6400      27.7       113       133        60
OIR    2025130    131400   -8.8900 -136.6500      27.3       112       139        60
OIR    2025130    131400   -8.8900 -136.6600      26.8       112       143        60
OIR    2025130    131400   -8.8900 -136.6700      26.2       112       142        60
OIR    2025130    131400   -8.8900 -136.6800      25.8       111       141        60
OIR    2025130    131400   -8.8900 -136.6900      25.6       111       142        60
OIR    2025130    131400   -8.8900 -136.7000      25.4       111       143        60
OIR    2025130    131400   -8.8900 -136.8300      16.4       121       145        60
OIR    2025130    131400   -8.8900 -136.8400      16.2       121       140        60
OIR    2025130    131400   -8.8900 -136.8500      16.1       121       139        60
OIR    2025130    131400   -8.8900 -136.8600      15.9       121       138        60
OIR    2025130    131400   -8.8900 -136.8700      15.8       121       138        60
OIR    2025130    131400   -8.8900 -136.8800      15.7       121       137        60
OIR    2025130    131400   -8.8900 -136.8900      15.6       121       137        60
OIR    2025130    131400   -8.8900 -136.9000      15.5       121       137        60
OIR    2025130    131400   -8.8900 -136.9100      15.4       121       136        60
OIR    2025130    131400   -8.8900 -136.9200      15.4       121       135        60
OIR    2025130    131400   -8.8900 -136.9300      15.4       121       133        60
OIR    2025130    131400   -8.8900 -136.9400      15.3       121       131        60
OIR    2025130    131400   -8.8900 -136.9500      15.3       121       129        60
OIR    2025130    131400   -8.8900 -136.9600      15.3       121       130        60
OIR    2025130    131400   -8.8900 -136.9700      15.3       121       130        60
OIR    2025130    131400   -8.8900 -136.9800      15.3       121       130        60
OIR    2025130    131400   -8.8900 -136.9900      15.3       121       130        60
OIR    2025130    131400   -8.8900 -137.0000      15.3       121       130        60
OIR    2025130    131400   -8.8900 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.8900 -137.0200      15.3       121       127        60
OIR    2025130    131400   -8.8900 -137.0300      15.2       121       126        60
OIR    2025130    131400   -8.8900 -137.0400      15.2       121       127        60
OIR    2025130    131400   -8.8900 -137.0500      15.2       121       126        60
OIR    2025130    131400   -8.8900 -137.0600      15.2       121       125        60
OIR    2025130    131400   -8.8900 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.8900 -137.0800      15.2       121       123        60
OIR    2025130    131400   -8.8900 -137.0900      15.2       121       122        60
OIR    2025130    131400   -8.8900 -137.1000      15.2       121       122        60
OIR    2025130    131400   -8.8900 -137.1100      15.2       121       123        60
OIR    2025130    131400   -8.8900 -137.1200      15.2       121       123        60
OIR    2025130    131400   -8.8900 -137.1300      15.2       121       123        60
OIR    2025130    131400   -8.8900 -137.1400      15.2       121       124        60
OIR    2025130    131400   -8.8900 -137.1500      15.2       121       125        60
OIR    2025130    131400   -8.8900 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.8900 -137.1700      15.2       121       125        60
OIR    2025130    131400   -8.8900 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.8900 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.8900 -137.2000      15.2       121       122        60
OIR    2025130    131400   -8.8900 -137.2100      15.2       121       122        60
OIR    2025130    131400   -8.8900 -137.2200      15.2       122       122        60
OIR    2025130    131400   -8.8900 -137.2300      15.2       122       122        60
OIR    2025130    131400   -8.8900 -137.2400      15.2       122       122        60
OIR    2025130    131400   -8.8900 -137.2500      15.1       122       123        60
OIR    2025130    131400   -8.8900 -137.2600      15.1       122       126        60
OIR    2025130    131400   -8.8900 -137.2700      15.1       122       128        60
OIR    2025130    131400   -8.8900 -137.2800      15.1       122       131        60
OIR    2025130    131400   -8.8900 -137.2900      15.1       122       131        60
OIR    2025130    131400   -8.8900 -137.3000      15.1       122       131        60
OIR    2025130    131400   -8.8900 -137.3100      15.1       122       131        60
OIR    2025130    131400   -8.8900 -137.3200      15.1       122       131        60
OIR    2025130    131400   -8.8900 -137.3300      15.0       122       128        60
OIR    2025130    131400   -8.8900 -137.3400      15.0       122       129        60
OIR    2025130    131400   -8.8900 -137.3500      14.9       122       131        60
OIR    2025130    131400   -8.8900 -137.3600      14.8       122       133        60
OIR    2025130    131400   -8.8900 -137.3700      14.7       121       135        60
OIR    2025130    131400   -8.8900 -137.3800      14.5       121       138        60
OIR    2025130    131400   -8.8900 -137.3900      14.4       120       140        60
OIR    2025130    131400   -8.8900 -137.4000      14.3       119       143        60
OIR    2025130    131400   -8.8900 -137.4100      13.9       114       147        60
OIR    2025130    131400   -8.8900 -138.0900      44.1       110       133        60
OIR    2025130    131400   -8.8900 -138.1000      28.3       106       124        60
OIR    2025130    131400   -8.8900 -138.1100      12.6       101       116        60
OIR    2025130    131400   -8.8900 -138.1200      12.0        99       112        60
OIR    2025130    131400   -8.8900 -138.1300      11.7        98       108        60
OIR    2025130    131400   -8.8900 -138.1400      11.3        96       104        60
OIR    2025130    131400   -8.8900 -138.1500      10.2        93       104        60
OIR    2025130    131400   -8.8900 -138.1600       9.2        89       103        60
OIR    2025130    131400   -8.8900 -138.1700       8.5        85       103        60
OIR    2025130    131400   -8.8900 -138.1800       8.4        85       103        60
OIR    2025130    131400   -8.8900 -138.1900       8.3        84       103        60
OIR    2025130    131400   -8.8900 -138.2000       8.3        84       104        60
OIR    2025130    131400   -8.8900 -138.2100       8.2        84       103        60
OIR    2025130    131400   -8.8900 -138.2200       8.2        84       104        60
OIR    2025130    131400   -8.8900 -138.2300       8.2        84       104        60
OIR    2025130    131400   -8.8900 -138.2400       8.2        83       103        60
OIR    2025130    131400   -8.8900 -138.2500       8.2        83       103        60
OIR    2025130    131400   -8.8900 -138.2600       8.2        83       103        60
OIR    2025130    131400   -8.8900 -138.2700       8.2        83       103        60
OIR    2025130    131400   -8.8900 -138.2800       8.2        83       103        60
OIR    2025130    131400   -8.8900 -138.2900       8.1        82       103        60
OIR    2025130    131400   -8.8900 -138.3000       8.1        82       103        60
OIR    2025130    131400   -8.8900 -138.3100       8.1        82       103        60
OIR    2025130    131400   -8.8900 -138.3200       8.1        82       103        60
OIR    2025130    131400   -8.8900 -138.3300       8.1        82       103        60
OIR    2025130    131400   -8.8900 -138.3400       8.0        82       103        60
OIR    2025130    131400   -8.8900 -138.3500       7.9        78       103        60
OIR    2025130    131400   -8.8900 -138.3600       7.8        62       103        60
OIR    2025130    131400   -8.8900 -138.3700       9.1        39       103        60
OIR    2025130    131400   -8.8900 -138.3800      10.7        21       103        60
OIR    2025130    131400   -8.8900 -138.3900      12.0        12       103        60
OIR    2025130    131400   -8.8900 -138.4000      13.0         7       103        60
OIR    2025130    131400   -8.8900 -138.4100      13.9         4       103        60
OIR    2025130    131400   -8.8900 -138.4200      15.0         2       103        60
OIR    2025130    131400   -8.8900 -138.4300      15.9         0       103        60
OIR    2025130    131400   -8.8900 -138.4400      16.6       359       103        60
OIR    2025130    131400   -8.8900 -138.4500      16.9       359       104        60
OIR    2025130    131400   -8.8900 -138.4600      17.0       359       104        60
OIR    2025130    131400   -8.8900 -138.4700      17.0       358       104        60
OIR    2025130    131400   -8.8900 -138.4800      16.9       358       104        60
OIR    2025130    131400   -8.8900 -138.4900      16.7       357       104        60
OIR    2025130    131400   -8.8900 -138.5000      16.4       357       104        60
OIR    2025130    131400   -8.8900 -138.5100      16.3       357       104        60
OIR    2025130    131400   -8.8900 -138.5200      16.2       357       105        60
OIR    2025130    131400   -8.8900 -138.5300      16.2       357       105        60
OIR    2025130    131400   -8.8900 -138.5400      16.2       356       104        60
OIR    2025130    131400   -8.8900 -138.5500      16.2       356       107        60
OIR    2025130    131400   -8.8900 -138.5600      16.1       356       109        60
OIR    2025130    131400   -8.8900 -138.5700      16.1       355       111        60
OIR    2025130    131400   -8.8900 -138.5800      15.9       354       111        60
OIR    2025130    131400   -8.8900 -138.5900      15.8       354       108        60
OIR    2025130    131400   -8.8900 -138.6000      15.7       353       105        60
OIR    2025130    131400   -8.8900 -138.6100      15.5       353       104        60
OIR    2025130    131400   -8.8900 -138.6200      15.4       352       105        60
OIR    2025130    131400   -8.8900 -138.6300      15.3       352       107        60
OIR    2025130    131400   -8.8900 -138.6400      15.1       351       104        60
OIR    2025130    131400   -8.8900 -138.6500      14.9       351       104        60
OIR    2025130    131400   -8.8900 -138.6600      14.7       351       103        60
OIR    2025130    131400   -8.8900 -138.6700      14.4       350       103        60
OIR    2025130    131400   -8.8900 -138.6800      14.1       349       103        60
OIR    2025130    131400   -8.8900 -138.6900      13.7       346       104        60
OIR    2025130    131400   -8.8900 -138.7000      13.4       344       104        60
OIR    2025130    131400   -8.8900 -138.7100      13.0       342       107        60
OIR    2025130    131400   -8.8900 -138.7200      12.5       340       114        60
OIR    2025130    131400   -8.8900 -138.7300      12.0       337       117        60
OIR    2025130    131400   -8.8900 -138.7400      11.7       334       121        60
OIR    2025130    131400   -8.8900 -138.7500      11.5       329       125        60
OIR    2025130    131400   -8.8900 -138.7600      11.7       321       129        60
OIR    2025130    131400   -8.8900 -138.7700      11.6       317       130        60
OIR    2025130    131400   -8.8900 -138.7800      11.4       315       132        60
OIR    2025130    131400   -8.8900 -138.7900      11.3       314       132        60
OIR    2025130    131400   -8.8900 -138.8000      11.2       313       132        60
OIR    2025130    131400   -8.8900 -138.8100      11.0       313       132        60
OIR    2025130    131400   -8.8900 -138.8200      10.9       313       130        60
OIR    2025130    131400   -8.8900 -138.8300      10.8       314       129        60
OIR    2025130    131400   -8.8900 -138.8400      10.6       315       128        60
OIR    2025130    131400   -8.8900 -138.8500      10.7       315       129        60
OIR    2025130    131400   -8.8900 -138.8600      11.1       317       142        60
OIR    2025130    131400   -8.9000 -136.5200      31.7       108       143        60
OIR    2025130    131400   -8.9000 -136.5300      31.5       108       141        60
OIR    2025130    131400   -8.9000 -136.5400      31.4       108       144        60
OIR    2025130    131400   -8.9000 -136.5600      31.2       108       141        60
OIR    2025130    131400   -8.9000 -136.5700      31.0       109       138        60
OIR    2025130    131400   -8.9000 -136.5800      30.8       109       135        60
OIR    2025130    131400   -8.9000 -136.5900      30.3       110       134        60
OIR    2025130    131400   -8.9000 -136.6000      29.3       112       136        60
OIR    2025130    131400   -8.9000 -136.6100      28.7       112       135        60
OIR    2025130    131400   -8.9000 -136.6200      28.4       112       133        60
OIR    2025130    131400   -8.9000 -136.6300      28.0       112       134        60
OIR    2025130    131400   -8.9000 -136.6400      27.7       112       135        60
OIR    2025130    131400   -8.9000 -136.6500      27.3       112       141        60
OIR    2025130    131400   -8.9000 -136.6700      26.2       112       139        60
OIR    2025130    131400   -8.9000 -136.6800      25.9       111       138        60
OIR    2025130    131400   -8.9000 -136.6900      25.8       111       139        60
OIR    2025130    131400   -8.9000 -136.7000      25.6       111       140        60
OIR    2025130    131400   -8.9000 -136.7100      25.5       111       143        60
OIR    2025130    131400   -8.9000 -136.7200      25.3       111       143        60
OIR    2025130    131400   -8.9000 -136.7300      25.2       111       142        60
OIR    2025130    131400   -8.9000 -136.7400      24.9       111       143        60
OIR    2025130    131400   -8.9000 -136.8300      16.5       121       146        60
OIR    2025130    131400   -8.9000 -136.8400      16.2       121       142        60
OIR    2025130    131400   -8.9000 -136.8500      16.1       121       141        60
OIR    2025130    131400   -8.9000 -136.8600      15.9       121       139        60
OIR    2025130    131400   -8.9000 -136.8700      15.8       121       138        60
OIR    2025130    131400   -8.9000 -136.8800      15.6       121       138        60
OIR    2025130    131400   -8.9000 -136.8900      15.5       121       138        60
OIR    2025130    131400   -8.9000 -136.9000      15.5       121       137        60
OIR    2025130    131400   -8.9000 -136.9100      15.4       121       136        60
OIR    2025130    131400   -8.9000 -136.9200      15.4       121       134        60
OIR    2025130    131400   -8.9000 -136.9300      15.4       121       132        60
OIR    2025130    131400   -8.9000 -136.9400      15.3       121       130        60
OIR    2025130    131400   -8.9000 -136.9500      15.3       121       129        60
OIR    2025130    131400   -8.9000 -136.9600      15.3       121       129        60
OIR    2025130    131400   -8.9000 -136.9700      15.3       121       129        60
OIR    2025130    131400   -8.9000 -136.9800      15.3       121       129        60
OIR    2025130    131400   -8.9000 -136.9900      15.3       121       129        60
OIR    2025130    131400   -8.9000 -137.0000      15.3       121       129        60
OIR    2025130    131400   -8.9000 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.9000 -137.0200      15.3       121       127        60
OIR    2025130    131400   -8.9000 -137.0300      15.3       121       126        60
OIR    2025130    131400   -8.9000 -137.0400      15.2       121       126        60
OIR    2025130    131400   -8.9000 -137.0500      15.2       121       126        60
OIR    2025130    131400   -8.9000 -137.0600      15.2       121       125        60
OIR    2025130    131400   -8.9000 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.9000 -137.0800      15.2       121       124        60
OIR    2025130    131400   -8.9000 -137.0900      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.1000      15.2       121       120        60
OIR    2025130    131400   -8.9000 -137.1100      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.1200      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.1300      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.1400      15.2       121       122        60
OIR    2025130    131400   -8.9000 -137.1500      15.2       121       124        60
OIR    2025130    131400   -8.9000 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.9000 -137.1700      15.2       121       125        60
OIR    2025130    131400   -8.9000 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.9000 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.9000 -137.2000      15.2       121       122        60
OIR    2025130    131400   -8.9000 -137.2100      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.2200      15.2       121       120        60
OIR    2025130    131400   -8.9000 -137.2300      15.2       121       121        60
OIR    2025130    131400   -8.9000 -137.2400      15.2       122       122        60
OIR    2025130    131400   -8.9000 -137.2500      15.2       122       122        60
OIR    2025130    131400   -8.9000 -137.2600      15.1       122       123        60
OIR    2025130    131400   -8.9000 -137.2700      15.1       122       125        60
OIR    2025130    131400   -8.9000 -137.2800      15.1       122       128        60
OIR    2025130    131400   -8.9000 -137.2900      15.1       122       128        60
OIR    2025130    131400   -8.9000 -137.3000      15.1       122       128        60
OIR    2025130    131400   -8.9000 -137.3100      15.1       122       129        60
OIR    2025130    131400   -8.9000 -137.3200      15.1       122       129        60
OIR    2025130    131400   -8.9000 -137.3300      15.1       122       127        60
OIR    2025130    131400   -8.9000 -137.3400      15.1       122       127        60
OIR    2025130    131400   -8.9000 -137.3500      15.0       122       128        60
OIR    2025130    131400   -8.9000 -137.3600      14.9       122       129        60
OIR    2025130    131400   -8.9000 -137.3700      14.8       121       130        60
OIR    2025130    131400   -8.9000 -137.3800      14.6       121       131        60
OIR    2025130    131400   -8.9000 -137.3900      14.4       121       132        60
OIR    2025130    131400   -8.9000 -137.4000      14.2       120       137        60
OIR    2025130    131400   -8.9000 -137.4100      13.9       118       141        60
OIR    2025130    131400   -8.9000 -138.0900      46.3       125       131        60
OIR    2025130    131400   -8.9000 -138.1000      28.6       118       122        60
OIR    2025130    131400   -8.9000 -138.1100      11.6       106       115        60
OIR    2025130    131400   -8.9000 -138.1200      11.7       101       110        60
OIR    2025130    131400   -8.9000 -138.1300      11.5        99       107        60
OIR    2025130    131400   -8.9000 -138.1400      11.1        97       103        60
OIR    2025130    131400   -8.9000 -138.1500       9.7        91       103        60
OIR    2025130    131400   -8.9000 -138.1600       8.7        86       103        60
OIR    2025130    131400   -8.9000 -138.1700       8.4        85       103        60
OIR    2025130    131400   -8.9000 -138.1800       8.3        84       103        60
OIR    2025130    131400   -8.9000 -138.1900       8.3        84       103        60
OIR    2025130    131400   -8.9000 -138.2000       8.3        84       103        60
OIR    2025130    131400   -8.9000 -138.2100       8.2        84       103        60
OIR    2025130    131400   -8.9000 -138.2200       8.2        83       103        60
OIR    2025130    131400   -8.9000 -138.2300       8.2        83       103        60
OIR    2025130    131400   -8.9000 -138.2400       8.2        83       103        60
OIR    2025130    131400   -8.9000 -138.2500       8.2        83       103        60
OIR    2025130    131400   -8.9000 -138.2600       8.2        82       103        60
OIR    2025130    131400   -8.9000 -138.2700       8.2        82       103        60
OIR    2025130    131400   -8.9000 -138.2800       8.2        82       103        60
OIR    2025130    131400   -8.9000 -138.2900       8.2        82       103        60
OIR    2025130    131400   -8.9000 -138.3000       8.1        82       103        60
OIR    2025130    131400   -8.9000 -138.3100       8.1        81       103        60
OIR    2025130    131400   -8.9000 -138.3200       8.1        81       103        60
OIR    2025130    131400   -8.9000 -138.3300       8.1        80       103        60
OIR    2025130    131400   -8.9000 -138.3400       7.9        78       103        60
OIR    2025130    131400   -8.9000 -138.3500       7.8        68       103        60
OIR    2025130    131400   -8.9000 -138.3600       8.6        41       103        60
OIR    2025130    131400   -8.9000 -138.3700      10.9        22       103        60
OIR    2025130    131400   -8.9000 -138.3800      12.9        13       103        60
OIR    2025130    131400   -8.9000 -138.3900      14.0         7       103        60
OIR    2025130    131400   -8.9000 -138.4000      14.8         4       103        60
OIR    2025130    131400   -8.9000 -138.4100      15.6         1       103        60
OIR    2025130    131400   -8.9000 -138.4200      16.3         0       103        60
OIR    2025130    131400   -8.9000 -138.4300      16.8       360       103        60
OIR    2025130    131400   -8.9000 -138.4400      17.1       359       103        60
OIR    2025130    131400   -8.9000 -138.4500      17.2       359       103        60
OIR    2025130    131400   -8.9000 -138.4600      17.2       359       103        60
OIR    2025130    131400   -8.9000 -138.4700      17.2       358       103        60
OIR    2025130    131400   -8.9000 -138.4800      17.1       358       103        60
OIR    2025130    131400   -8.9000 -138.4900      17.0       357       103        60
OIR    2025130    131400   -8.9000 -138.5000      16.7       357       104        60
OIR    2025130    131400   -8.9000 -138.5100      16.5       357       104        60
OIR    2025130    131400   -8.9000 -138.5200      16.4       356       105        60
OIR    2025130    131400   -8.9000 -138.5300      16.3       356       105        60
OIR    2025130    131400   -8.9000 -138.5400      16.4       356       105        60
OIR    2025130    131400   -8.9000 -138.5500      16.4       356       108        60
OIR    2025130    131400   -8.9000 -138.5600      16.4       355       109        60
OIR    2025130    131400   -8.9000 -138.5700      16.3       355       110        60
OIR    2025130    131400   -8.9000 -138.5800      16.2       354       109        60
OIR    2025130    131400   -8.9000 -138.5900      16.1       354       107        60
OIR    2025130    131400   -8.9000 -138.6000      16.0       353       105        60
OIR    2025130    131400   -8.9000 -138.6100      15.8       353       105        60
OIR    2025130    131400   -8.9000 -138.6200      15.7       352       105        60
OIR    2025130    131400   -8.9000 -138.6300      15.6       352       107        60
OIR    2025130    131400   -8.9000 -138.6400      15.5       351       104        60
OIR    2025130    131400   -8.9000 -138.6500      15.3       351       104        60
OIR    2025130    131400   -8.9000 -138.6600      15.2       350       103        60
OIR    2025130    131400   -8.9000 -138.6700      15.1       349       103        60
OIR    2025130    131400   -8.9000 -138.6800      14.9       348       103        60
OIR    2025130    131400   -8.9000 -138.6900      14.7       346       103        60
OIR    2025130    131400   -8.9000 -138.7000      14.4       344       103        60
OIR    2025130    131400   -8.9000 -138.7100      14.1       342       104        60
OIR    2025130    131400   -8.9000 -138.7200      13.7       339       111        60
OIR    2025130    131400   -8.9000 -138.7300      13.3       337       116        60
OIR    2025130    131400   -8.9000 -138.7400      13.1       334       120        60
OIR    2025130    131400   -8.9000 -138.7500      12.8       331       123        60
OIR    2025130    131400   -8.9000 -138.7600      12.7       326       125        60
OIR    2025130    131400   -8.9000 -138.7700      12.3       322       128        60
OIR    2025130    131400   -8.9000 -138.7800      11.9       319       130        60
OIR    2025130    131400   -8.9000 -138.7900      11.8       318       129        60
OIR    2025130    131400   -8.9000 -138.8000      11.7       318       130        60
OIR    2025130    131400   -8.9000 -138.8100      11.6       318       130        60
OIR    2025130    131400   -8.9000 -138.8200      11.3       318       130        60
OIR    2025130    131400   -8.9000 -138.8300      11.2       318       130        60
OIR    2025130    131400   -8.9000 -138.8400      11.1       319       130        60
OIR    2025130    131400   -8.9000 -138.8500      11.3       320       130        60
OIR    2025130    131400   -8.9000 -138.8600      11.8       322       138        60
OIR    2025130    131400   -8.9000 -138.8700      12.2       322       145        60
OIR    2025130    131400   -8.9100 -136.5100      31.9       107       143        60
OIR    2025130    131400   -8.9100 -136.5200      31.8       108       140        60
OIR    2025130    131400   -8.9100 -136.5300      31.7       108       137        60
OIR    2025130    131400   -8.9100 -136.5400      31.6       108       138        60
OIR    2025130    131400   -8.9100 -136.5500      31.5       108       138        60
OIR    2025130    131400   -8.9100 -136.5600      31.5       108       136        60
OIR    2025130    131400   -8.9100 -136.5700      31.3       109       134        60
OIR    2025130    131400   -8.9100 -136.5800      31.2       109       132        60
OIR    2025130    131400   -8.9100 -136.5900      30.7       109       131        60
OIR    2025130    131400   -8.9100 -136.6000      30.0       111       133        60
OIR    2025130    131400   -8.9100 -136.6100      29.2       112       135        60
OIR    2025130    131400   -8.9100 -136.6200      28.6       112       136        60
OIR    2025130    131400   -8.9100 -136.6300      28.2       112       139        60
OIR    2025130    131400   -8.9100 -136.6400      27.8       112       141        60
OIR    2025130    131400   -8.9100 -136.6700      26.1       112       139        60
OIR    2025130    131400   -8.9100 -136.6800      25.9       111       137        60
OIR    2025130    131400   -8.9100 -136.6900      25.9       111       138        60
OIR    2025130    131400   -8.9100 -136.7000      25.8       111       139        60
OIR    2025130    131400   -8.9100 -136.7100      25.6       111       138        60
OIR    2025130    131400   -8.9100 -136.7200      25.5       111       140        60
OIR    2025130    131400   -8.9100 -136.7300      25.4       111       143        60
OIR    2025130    131400   -8.9100 -136.7400      25.2       111       141        60
OIR    2025130    131400   -8.9100 -136.7500      24.9       111       139        60
OIR    2025130    131400   -8.9100 -136.7600      24.5       112       142        60
OIR    2025130    131400   -8.9100 -136.7700      24.2       112       146        60
OIR    2025130    131400   -8.9100 -136.8300      16.7       120       146        60
OIR    2025130    131400   -8.9100 -136.8400      16.3       120       146        60
OIR    2025130    131400   -8.9100 -136.8500      16.1       120       143        60
OIR    2025130    131400   -8.9100 -136.8600      15.9       120       140        60
OIR    2025130    131400   -8.9100 -136.8700      15.8       121       139        60
OIR    2025130    131400   -8.9100 -136.8800      15.6       121       139        60
OIR    2025130    131400   -8.9100 -136.8900      15.5       121       138        60
OIR    2025130    131400   -8.9100 -136.9000      15.5       121       137        60
OIR    2025130    131400   -8.9100 -136.9100      15.4       121       135        60
OIR    2025130    131400   -8.9100 -136.9200      15.4       121       133        60
OIR    2025130    131400   -8.9100 -136.9300      15.3       121       132        60
OIR    2025130    131400   -8.9100 -136.9400      15.3       121       131        60
OIR    2025130    131400   -8.9100 -136.9500      15.3       121       129        60
OIR    2025130    131400   -8.9100 -136.9600      15.3       121       129        60
OIR    2025130    131400   -8.9100 -136.9700      15.3       121       129        60
OIR    2025130    131400   -8.9100 -136.9800      15.3       121       128        60
OIR    2025130    131400   -8.9100 -136.9900      15.3       121       127        60
OIR    2025130    131400   -8.9100 -137.0000      15.3       121       128        60
OIR    2025130    131400   -8.9100 -137.0100      15.3       121       128        60
OIR    2025130    131400   -8.9100 -137.0200      15.3       121       127        60
OIR    2025130    131400   -8.9100 -137.0300      15.3       121       126        60
OIR    2025130    131400   -8.9100 -137.0400      15.3       121       125        60
OIR    2025130    131400   -8.9100 -137.0500      15.2       121       125        60
OIR    2025130    131400   -8.9100 -137.0600      15.2       121       126        60
OIR    2025130    131400   -8.9100 -137.0700      15.2       121       125        60
OIR    2025130    131400   -8.9100 -137.0800      15.2       121       125        60
OIR    2025130    131400   -8.9100 -137.0900      15.2       121       121        60
OIR    2025130    131400   -8.9100 -137.1000      15.2       121       119        60
OIR    2025130    131400   -8.9100 -137.1100      15.2       121       121        60
OIR    2025130    131400   -8.9100 -137.1200      15.2       121       121        60
OIR    2025130    131400   -8.9100 -137.1300      15.2       121       120        60
OIR    2025130    131400   -8.9100 -137.1400      15.2       121       121        60
OIR    2025130    131400   -8.9100 -137.1500      15.2       121       124        60
OIR    2025130    131400   -8.9100 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.9100 -137.1700      15.2       121       124        60
OIR    2025130    131400   -8.9100 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.9100 -137.1900      15.2       121       124        60
OIR    2025130    131400   -8.9100 -137.2000      15.2       121       120        60
OIR    2025130    131400   -8.9100 -137.2100      15.2       121       117        60
OIR    2025130    131400   -8.9100 -137.2200      15.2       121       119        60
OIR    2025130    131400   -8.9100 -137.2300      15.2       121       120        60
OIR    2025130    131400   -8.9100 -137.2400      15.2       121       121        60
OIR    2025130    131400   -8.9100 -137.2500      15.2       122       121        60
OIR    2025130    131400   -8.9100 -137.2600      15.1       122       121        60
OIR    2025130    131400   -8.9100 -137.2700      15.1       122       122        60
OIR    2025130    131400   -8.9100 -137.2800      15.1       122       124        60
OIR    2025130    131400   -8.9100 -137.2900      15.1       122       124        60
OIR    2025130    131400   -8.9100 -137.3000      15.2       122       124        60
OIR    2025130    131400   -8.9100 -137.3100      15.2       122       127        60
OIR    2025130    131400   -8.9100 -137.3200      15.1       122       128        60
OIR    2025130    131400   -8.9100 -137.3300      15.1       122       127        60
OIR    2025130    131400   -8.9100 -137.3400      15.1       122       127        60
OIR    2025130    131400   -8.9100 -137.3500      15.1       122       127        60
OIR    2025130    131400   -8.9100 -137.3600      15.0       121       126        60
OIR    2025130    131400   -8.9100 -137.3700      14.9       121       126        60
OIR    2025130    131400   -8.9100 -137.3800      14.8       121       127        60
OIR    2025130    131400   -8.9100 -137.3900      14.4       121       127        60
OIR    2025130    131400   -8.9100 -137.4000      14.2       120       132        60
OIR    2025130    131400   -8.9100 -137.4100      14.1       119       137        60
OIR    2025130    131400   -8.9100 -138.0900      48.9       137       128        60
OIR    2025130    131400   -8.9100 -138.1000      31.4       130       119        60
OIR    2025130    131400   -8.9100 -138.1100      12.9       120       113        60
OIR    2025130    131400   -8.9100 -138.1200      11.8       105       108        60
OIR    2025130    131400   -8.9100 -138.1300      11.6       101       105        60
OIR    2025130    131400   -8.9100 -138.1400      11.1        98       103        60
OIR    2025130    131400   -8.9100 -138.1500       9.0        89       103        60
OIR    2025130    131400   -8.9100 -138.1600       8.4        85       103        60
OIR    2025130    131400   -8.9100 -138.1700       8.3        84       103        60
OIR    2025130    131400   -8.9100 -138.1800       8.3        84       103        60
OIR    2025130    131400   -8.9100 -138.1900       8.3        84       103        60
OIR    2025130    131400   -8.9100 -138.2000       8.3        84       103        60
OIR    2025130    131400   -8.9100 -138.2100       8.2        83       103        60
OIR    2025130    131400   -8.9100 -138.2200       8.2        83       103        60
OIR    2025130    131400   -8.9100 -138.2300       8.2        83       103        60
OIR    2025130    131400   -8.9100 -138.2400       8.2        82       103        60
OIR    2025130    131400   -8.9100 -138.2500       8.2        82       103        60
OIR    2025130    131400   -8.9100 -138.2600       8.2        82       103        60
OIR    2025130    131400   -8.9100 -138.2700       8.2        82       103        60
OIR    2025130    131400   -8.9100 -138.2800       8.2        81       103        60
OIR    2025130    131400   -8.9100 -138.2900       8.2        81       103        60
OIR    2025130    131400   -8.9100 -138.3000       8.2        80       103        60
OIR    2025130    131400   -8.9100 -138.3100       8.2        79       103        60
OIR    2025130    131400   -8.9100 -138.3200       8.2        78       103        60
OIR    2025130    131400   -8.9100 -138.3300       8.1        76       103        60
OIR    2025130    131400   -8.9100 -138.3400       7.8        69       103        60
OIR    2025130    131400   -8.9100 -138.3500       8.0        50       103        60
OIR    2025130    131400   -8.9100 -138.3600      10.3        24       103        60
OIR    2025130    131400   -8.9100 -138.3700      13.2        11       103        60
OIR    2025130    131400   -8.9100 -138.3800      14.8         7       103        60
OIR    2025130    131400   -8.9100 -138.3900      15.6         4       103        60
OIR    2025130    131400   -8.9100 -138.4000      16.2         1       103        60
OIR    2025130    131400   -8.9100 -138.4100      16.7       360       103        60
OIR    2025130    131400   -8.9100 -138.4200      17.1       359       103        60
OIR    2025130    131400   -8.9100 -138.4300      17.3       359       103        60
OIR    2025130    131400   -8.9100 -138.4400      17.3       359       103        60
OIR    2025130    131400   -8.9100 -138.4500      17.4       359       103        60
OIR    2025130    131400   -8.9100 -138.4600      17.4       359       103        60
OIR    2025130    131400   -8.9100 -138.4700      17.4       358       103        60
OIR    2025130    131400   -8.9100 -138.4800      17.4       358       103        60
OIR    2025130    131400   -8.9100 -138.4900      17.2       357       103        60
OIR    2025130    131400   -8.9100 -138.5000      17.0       357       104        60
OIR    2025130    131400   -8.9100 -138.5100      16.8       357       104        60
OIR    2025130    131400   -8.9100 -138.5200      16.6       356       104        60
OIR    2025130    131400   -8.9100 -138.5300      16.5       356       107        60
OIR    2025130    131400   -8.9100 -138.5400      16.5       356       109        60
OIR    2025130    131400   -8.9100 -138.5500      16.6       355       110        60
OIR    2025130    131400   -8.9100 -138.5600      16.7       355       110        60
OIR    2025130    131400   -8.9100 -138.5700      16.7       355       108        60
OIR    2025130    131400   -8.9100 -138.5800      16.6       354       107        60
OIR    2025130    131400   -8.9100 -138.5900      16.5       354       107        60
OIR    2025130    131400   -8.9100 -138.6000      16.4       353       107        60
OIR    2025130    131400   -8.9100 -138.6100      16.3       353       109        60
OIR    2025130    131400   -8.9100 -138.6200      16.1       352       107        60
OIR    2025130    131400   -8.9100 -138.6300      16.0       351       104        60
OIR    2025130    131400   -8.9100 -138.6400      15.9       351       104        60
OIR    2025130    131400   -8.9100 -138.6500      15.8       350       104        60
OIR    2025130    131400   -8.9100 -138.6600      15.7       349       103        60
OIR    2025130    131400   -8.9100 -138.6700      15.6       348       103        60
OIR    2025130    131400   -8.9100 -138.6800      15.6       347       103        60
OIR    2025130    131400   -8.9100 -138.6900      15.5       345       103        60
OIR    2025130    131400   -8.9100 -138.7000      15.4       343       103        60
OIR    2025130    131400   -8.9100 -138.7100      15.1       342       104        60
OIR    2025130    131400   -8.9100 -138.7200      14.7       339       105        60
OIR    2025130    131400   -8.9100 -138.7300      14.5       337       112        60
OIR    2025130    131400   -8.9100 -138.7400      14.3       335       117        60
OIR    2025130    131400   -8.9100 -138.7500      14.2       333       120        60
OIR    2025130    131400   -8.9100 -138.7600      13.8       331       121        60
OIR    2025130    131400   -8.9100 -138.7700      13.2       328       124        60
OIR    2025130    131400   -8.9100 -138.7800      12.8       324       126        60
OIR    2025130    131400   -8.9100 -138.7900      12.5       323       125        60
OIR    2025130    131400   -8.9100 -138.8000      12.4       323       125        60
OIR    2025130    131400   -8.9100 -138.8100      12.2       323       126        60
OIR    2025130    131400   -8.9100 -138.8200      12.0       323       129        60
OIR    2025130    131400   -8.9100 -138.8300      11.9       323       131        60
OIR    2025130    131400   -8.9100 -138.8400      11.9       324       133        60
OIR    2025130    131400   -8.9100 -138.8500      12.0       324       134        60
OIR    2025130    131400   -8.9100 -138.8600      12.1       324       132        60
OIR    2025130    131400   -8.9100 -138.8700      12.2       324       135        60
OIR    2025130    131400   -8.9100 -138.8800      12.2       324       143        60
OIR    2025130    131400   -8.9200 -136.5100      32.1       107       143        60
OIR    2025130    131400   -8.9200 -136.5200      32.1       108       139        60
OIR    2025130    131400   -8.9200 -136.5300      32.0       108       135        60
OIR    2025130    131400   -8.9200 -136.5400      31.8       108       134        60
OIR    2025130    131400   -8.9200 -136.5500      31.7       108       133        60
OIR    2025130    131400   -8.9200 -136.5600      31.7       108       132        60
OIR    2025130    131400   -8.9200 -136.5700      31.5       109       131        60
OIR    2025130    131400   -8.9200 -136.5800      31.4       109       130        60
OIR    2025130    131400   -8.9200 -136.5900      31.1       109       130        60
OIR    2025130    131400   -8.9200 -136.6000      30.6       110       131        60
OIR    2025130    131400   -8.9200 -136.6100      30.1       110       134        60
OIR    2025130    131400   -8.9200 -136.6200      29.4       111       137        60
OIR    2025130    131400   -8.9200 -136.6300      28.7       111       142        60
OIR    2025130    131400   -8.9200 -136.6700      26.0       111       138        60
OIR    2025130    131400   -8.9200 -136.6800      25.9       111       136        60
OIR    2025130    131400   -8.9200 -136.6900      25.9       111       138        60
OIR    2025130    131400   -8.9200 -136.7000      25.9       111       138        60
OIR    2025130    131400   -8.9200 -136.7100      25.8       111       136        60
OIR    2025130    131400   -8.9200 -136.7200      25.7       111       138        60
OIR    2025130    131400   -8.9200 -136.7300      25.6       111       141        60
OIR    2025130    131400   -8.9200 -136.7400      25.4       111       139        60
OIR    2025130    131400   -8.9200 -136.7500      25.1       111       137        60
OIR    2025130    131400   -8.9200 -136.7600      24.7       112       140        60
OIR    2025130    131400   -8.9200 -136.7700      24.4       112       143        60
OIR    2025130    131400   -8.9200 -136.7800      24.0       112       145        60
OIR    2025130    131400   -8.9200 -136.7900      22.5       113       145        60
OIR    2025130    131400   -8.9200 -136.8000      21.2       114       145        60
OIR    2025130    131400   -8.9200 -136.8100      19.9       115       145        60
OIR    2025130    131400   -8.9200 -136.8200      18.5       116       146        60
OIR    2025130    131400   -8.9200 -136.8500      16.1       120       144        60
OIR    2025130    131400   -8.9200 -136.8600      15.9       120       142        60
OIR    2025130    131400   -8.9200 -136.8700      15.8       120       141        60
OIR    2025130    131400   -8.9200 -136.8800      15.6       120       140        60
OIR    2025130    131400   -8.9200 -136.8900      15.5       120       140        60
OIR    2025130    131400   -8.9200 -136.9000      15.5       121       138        60
OIR    2025130    131400   -8.9200 -136.9100      15.4       121       135        60
OIR    2025130    131400   -8.9200 -136.9200      15.4       121       134        60
OIR    2025130    131400   -8.9200 -136.9300      15.3       121       133        60
OIR    2025130    131400   -8.9200 -136.9400      15.3       121       131        60
OIR    2025130    131400   -8.9200 -136.9500      15.3       121       130        60
OIR    2025130    131400   -8.9200 -136.9600      15.3       121       129        60
OIR    2025130    131400   -8.9200 -136.9700      15.3       121       128        60
OIR    2025130    131400   -8.9200 -136.9800      15.3       121       127        60
OIR    2025130    131400   -8.9200 -136.9900      15.3       121       126        60
OIR    2025130    131400   -8.9200 -137.0000      15.3       121       127        60
OIR    2025130    131400   -8.9200 -137.0100      15.3       121       127        60
OIR    2025130    131400   -8.9200 -137.0200      15.3       121       127        60
OIR    2025130    131400   -8.9200 -137.0300      15.3       121       126        60
OIR    2025130    131400   -8.9200 -137.0400      15.3       121       125        60
OIR    2025130    131400   -8.9200 -137.0500      15.2       121       125        60
OIR    2025130    131400   -8.9200 -137.0600      15.2       121       126        60
OIR    2025130    131400   -8.9200 -137.0700      15.2       121       125        60
OIR    2025130    131400   -8.9200 -137.0800      15.2       121       124        60
OIR    2025130    131400   -8.9200 -137.0900      15.2       121       121        60
OIR    2025130    131400   -8.9200 -137.1000      15.2       121       119        60
OIR    2025130    131400   -8.9200 -137.1100      15.2       121       120        60
OIR    2025130    131400   -8.9200 -137.1200      15.2       121       120        60
OIR    2025130    131400   -8.9200 -137.1300      15.2       121       120        60
OIR    2025130    131400   -8.9200 -137.1400      15.2       121       121        60
OIR    2025130    131400   -8.9200 -137.1500      15.2       121       124        60
OIR    2025130    131400   -8.9200 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.9200 -137.1700      15.2       121       124        60
OIR    2025130    131400   -8.9200 -137.1800      15.2       121       124        60
OIR    2025130    131400   -8.9200 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.9200 -137.2000      15.2       121       120        60
OIR    2025130    131400   -8.9200 -137.2100      15.2       121       117        60
OIR    2025130    131400   -8.9200 -137.2200      15.2       121       119        60
OIR    2025130    131400   -8.9200 -137.2300      15.2       121       121        60
OIR    2025130    131400   -8.9200 -137.2400      15.2       121       122        60
OIR    2025130    131400   -8.9200 -137.2500      15.2       121       121        60
OIR    2025130    131400   -8.9200 -137.2600      15.2       121       119        60
OIR    2025130    131400   -8.9200 -137.2700      15.2       122       119        60
OIR    2025130    131400   -8.9200 -137.2800      15.2       122       121        60
OIR    2025130    131400   -8.9200 -137.2900      15.2       122       121        60
OIR    2025130    131400   -8.9200 -137.3000      15.2       122       122        60
OIR    2025130    131400   -8.9200 -137.3100      15.2       122       125        60
OIR    2025130    131400   -8.9200 -137.3200      15.2       122       128        60
OIR    2025130    131400   -8.9200 -137.3300      15.2       122       126        60
OIR    2025130    131400   -8.9200 -137.3400      15.1       122       125        60
OIR    2025130    131400   -8.9200 -137.3500      15.1       122       124        60
OIR    2025130    131400   -8.9200 -137.3600      15.1       122       124        60
OIR    2025130    131400   -8.9200 -137.3700      15.0       121       124        60
OIR    2025130    131400   -8.9200 -137.3800      15.0       121       124        60
OIR    2025130    131400   -8.9200 -137.3900      14.5       121       126        60
OIR    2025130    131400   -8.9200 -137.4000      14.3       120       131        60
OIR    2025130    131400   -8.9200 -137.4100      14.1       119       135        60
OIR    2025130    131400   -8.9200 -138.0900      45.3       137       130        60
OIR    2025130    131400   -8.9200 -138.1000      34.3       136       120        60
OIR    2025130    131400   -8.9200 -138.1100      17.9       131       114        60
OIR    2025130    131400   -8.9200 -138.1200      12.6       110       109        60
OIR    2025130    131400   -8.9200 -138.1300      11.9       104       105        60
OIR    2025130    131400   -8.9200 -138.1400      11.2       100       103        60
OIR    2025130    131400   -8.9200 -138.1500       8.5        86       103        60
OIR    2025130    131400   -8.9200 -138.1600       8.3        84       103        60
OIR    2025130    131400   -8.9200 -138.1700       8.3        84       103        60
OIR    2025130    131400   -8.9200 -138.1800       8.3        84       103        60
OIR    2025130    131400   -8.9200 -138.1900       8.3        83       104        60
OIR    2025130    131400   -8.9200 -138.2000       8.3        83       104        60
OIR    2025130    131400   -8.9200 -138.2100       8.2        83       103        60
OIR    2025130    131400   -8.9200 -138.2200       8.2        83       103        60
OIR    2025130    131400   -8.9200 -138.2300       8.2        82       103        60
OIR    2025130    131400   -8.9200 -138.2400       8.2        82       103        60
OIR    2025130    131400   -8.9200 -138.2500       8.2        82       103        60
OIR    2025130    131400   -8.9200 -138.2600       8.2        81       103        60
OIR    2025130    131400   -8.9200 -138.2700       8.3        81       103        60
OIR    2025130    131400   -8.9200 -138.2800       8.3        79       103        60
OIR    2025130    131400   -8.9200 -138.2900       8.3        78       103        60
OIR    2025130    131400   -8.9200 -138.3000       8.3        76       103        60
OIR    2025130    131400   -8.9200 -138.3100       8.4        75       103        60
OIR    2025130    131400   -8.9200 -138.3200       8.4        73       103        60
OIR    2025130    131400   -8.9200 -138.3300       8.3        68       103        60
OIR    2025130    131400   -8.9200 -138.3400       8.3        55       103        60
OIR    2025130    131400   -8.9200 -138.3500       9.3        29       103        60
OIR    2025130    131400   -8.9200 -138.3600      13.2         9       103        60
OIR    2025130    131400   -8.9200 -138.3700      16.1         3       103        60
OIR    2025130    131400   -8.9200 -138.3800      17.1         1       103        60
OIR    2025130    131400   -8.9200 -138.3900      17.3       360       103        60
OIR    2025130    131400   -8.9200 -138.4000      17.4       359       103        60
OIR    2025130    131400   -8.9200 -138.4100      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4200      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4300      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4400      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4500      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4600      17.5       359       103        60
OIR    2025130    131400   -8.9200 -138.4700      17.6       358       103        60
OIR    2025130    131400   -8.9200 -138.4800      17.5       358       104        60
OIR    2025130    131400   -8.9200 -138.4900      17.5       357       104        60
OIR    2025130    131400   -8.9200 -138.5000      17.4       357       103        60
OIR    2025130    131400   -8.9200 -138.5100      17.4       356       104        60
OIR    2025130    131400   -8.9200 -138.5200      17.4       356       104        60
OIR    2025130    131400   -8.9200 -138.5300      17.4       356       104        60
OIR    2025130    131400   -8.9200 -138.5400      17.4       356       105        60
OIR    2025130    131400   -8.9200 -138.5500      17.5       355       107        60
OIR    2025130    131400   -8.9200 -138.5600      17.4       355       108        60
OIR    2025130    131400   -8.9200 -138.5700      17.2       355       109        60
OIR    2025130    131400   -8.9200 -138.5800      17.1       355       109        60
OIR    2025130    131400   -8.9200 -138.5900      17.0       354       110        60
OIR    2025130    131400   -8.9200 -138.6000      16.9       354       110        60
OIR    2025130    131400   -8.9200 -138.6100      16.7       353       111        60
OIR    2025130    131400   -8.9200 -138.6200      16.6       352       109        60
OIR    2025130    131400   -8.9200 -138.6300      16.4       351       105        60
OIR    2025130    131400   -8.9200 -138.6400      16.3       350       104        60
OIR    2025130    131400   -8.9200 -138.6500      16.2       350       104        60
OIR    2025130    131400   -8.9200 -138.6600      16.2       349       103        60
OIR    2025130    131400   -8.9200 -138.6700      16.1       347       103        60
OIR    2025130    131400   -8.9200 -138.6800      16.2       346       103        60
OIR    2025130    131400   -8.9200 -138.6900      16.2       345       103        60
OIR    2025130    131400   -8.9200 -138.7000      16.1       343       103        60
OIR    2025130    131400   -8.9200 -138.7100      15.8       342       104        60
OIR    2025130    131400   -8.9200 -138.7200      15.5       340       104        60
OIR    2025130    131400   -8.9200 -138.7300      15.2       338       109        60
OIR    2025130    131400   -8.9200 -138.7400      15.1       336       115        60
OIR    2025130    131400   -8.9200 -138.7500      15.0       335       116        60
OIR    2025130    131400   -8.9200 -138.7600      14.8       335       117        60
OIR    2025130    131400   -8.9200 -138.7700      14.2       333       121        60
OIR    2025130    131400   -8.9200 -138.7800      13.7       329       123        60
OIR    2025130    131400   -8.9200 -138.7900      13.1       327       125        60
OIR    2025130    131400   -8.9200 -138.8000      12.9       326       126        60
OIR    2025130    131400   -8.9200 -138.8100      12.5       325       127        60
OIR    2025130    131400   -8.9200 -138.8200      12.3       325       129        60
OIR    2025130    131400   -8.9200 -138.8300      12.2       325       132        60
OIR    2025130    131400   -8.9200 -138.8400      12.1       325       133        60
OIR    2025130    131400   -8.9200 -138.8500      12.1       325       135        60
OIR    2025130    131400   -8.9200 -138.8600      12.2       324       134        60
OIR    2025130    131400   -8.9200 -138.8700      12.2       324       134        60
OIR    2025130    131400   -8.9200 -138.8800      12.2       324       137        60
OIR    2025130    131400   -8.9200 -138.8900      12.2       324       141        60
OIR    2025130    131400   -8.9300 -136.5200      32.2       108       140        60
OIR    2025130    131400   -8.9300 -136.5300      32.2       108       135        60
OIR    2025130    131400   -8.9300 -136.5400      32.1       108       133        60
OIR    2025130    131400   -8.9300 -136.5500      32.0       108       131        60
OIR    2025130    131400   -8.9300 -136.5600      32.0       108       131        60
OIR    2025130    131400   -8.9300 -136.5700      31.9       109       130        60
OIR    2025130    131400   -8.9300 -136.5800      31.6       109       131        60
OIR    2025130    131400   -8.9300 -136.5900      31.4       109       131        60
OIR    2025130    131400   -8.9300 -136.6000      31.0       110       132        60
OIR    2025130    131400   -8.9300 -136.6100      30.4       110       133        60
OIR    2025130    131400   -8.9300 -136.6200      29.8       110       136        60
OIR    2025130    131400   -8.9300 -136.6300      29.2       110       143        60
OIR    2025130    131400   -8.9300 -136.6600      26.0       111       143        60
OIR    2025130    131400   -8.9300 -136.6700      26.0       111       137        60
OIR    2025130    131400   -8.9300 -136.6800      25.9       111       135        60
OIR    2025130    131400   -8.9300 -136.6900      25.9       111       136        60
OIR    2025130    131400   -8.9300 -136.7000      25.9       111       138        60
OIR    2025130    131400   -8.9300 -136.7100      25.9       111       139        60
OIR    2025130    131400   -8.9300 -136.7200      25.8       111       137        60
OIR    2025130    131400   -8.9300 -136.7300      25.7       111       135        60
OIR    2025130    131400   -8.9300 -136.7400      25.6       111       136        60
OIR    2025130    131400   -8.9300 -136.7500      25.4       111       137        60
OIR    2025130    131400   -8.9300 -136.7600      24.9       111       138        60
OIR    2025130    131400   -8.9300 -136.7700      24.6       112       140        60
OIR    2025130    131400   -8.9300 -136.7800      24.3       112       145        60
OIR    2025130    131400   -8.9300 -136.7900      23.2       112       146        60
OIR    2025130    131400   -8.9300 -136.8000      22.0       113       144        60
OIR    2025130    131400   -8.9300 -136.8100      20.7       114       145        60
OIR    2025130    131400   -8.9300 -136.8400      16.5       118       146        60
OIR    2025130    131400   -8.9300 -136.8500      16.2       119       145        60
OIR    2025130    131400   -8.9300 -136.8600      16.0       119       144        60
OIR    2025130    131400   -8.9300 -136.8700      15.8       120       143        60
OIR    2025130    131400   -8.9300 -136.8800      15.6       120       142        60
OIR    2025130    131400   -8.9300 -136.8900      15.5       120       142        60
OIR    2025130    131400   -8.9300 -136.9000      15.5       120       140        60
OIR    2025130    131400   -8.9300 -136.9100      15.4       120       137        60
OIR    2025130    131400   -8.9300 -136.9200      15.3       120       135        60
OIR    2025130    131400   -8.9300 -136.9300      15.3       120       135        60
OIR    2025130    131400   -8.9300 -136.9400      15.3       121       133        60
OIR    2025130    131400   -8.9300 -136.9500      15.3       121       130        60
OIR    2025130    131400   -8.9300 -136.9600      15.3       121       128        60
OIR    2025130    131400   -8.9300 -136.9700      15.3       121       127        60
OIR    2025130    131400   -8.9300 -136.9800      15.3       121       127        60
OIR    2025130    131400   -8.9300 -136.9900      15.3       121       127        60
OIR    2025130    131400   -8.9300 -137.0000      15.3       121       127        60
OIR    2025130    131400   -8.9300 -137.0100      15.3       121       126        60
OIR    2025130    131400   -8.9300 -137.0200      15.3       121       126        60
OIR    2025130    131400   -8.9300 -137.0300      15.3       121       126        60
OIR    2025130    131400   -8.9300 -137.0400      15.3       121       125        60
OIR    2025130    131400   -8.9300 -137.0500      15.3       121       126        60
OIR    2025130    131400   -8.9300 -137.0600      15.2       121       127        60
OIR    2025130    131400   -8.9300 -137.0700      15.2       121       124        60
OIR    2025130    131400   -8.9300 -137.0800      15.2       121       122        60
OIR    2025130    131400   -8.9300 -137.0900      15.2       121       121        60
OIR    2025130    131400   -8.9300 -137.1000      15.2       121       120        60
OIR    2025130    131400   -8.9300 -137.1100      15.2       121       119        60
OIR    2025130    131400   -8.9300 -137.1200      15.2       121       120        60
OIR    2025130    131400   -8.9300 -137.1300      15.2       121       120        60
OIR    2025130    131400   -8.9300 -137.1400      15.2       121       121        60
OIR    2025130    131400   -8.9300 -137.1500      15.2       121       124        60
OIR    2025130    131400   -8.9300 -137.1600      15.2       121       125        60
OIR    2025130    131400   -8.9300 -137.1700      15.2       121       124        60
OIR    2025130    131400   -8.9300 -137.1800      15.2       121       123        60
OIR    2025130    131400   -8.9300 -137.1900      15.2       121       123        60
OIR    2025130    131400   -8.9300 -137.2000      15.2       121       120        60
OIR    2025130    131400   -8.9300 -137.2100      15.2       121       119        60
OIR    2025130    131400   -8.9300 -137.2200      15.2       121       120        60
OIR    2025130    131400   -8.9300 -137.2300      15.2       121       121        60
OIR    2025130    131400   -8.9300 -137.2400      15.2       121       123        60
OIR    2025130    131400   -8.9300 -137.2500      15.2       121       122        60
OIR    2025130    131400   -8.9300 -137.2600      15.2       121       116        60
OIR    2025130    131400   -8.9300 -137.2700      15.2       121       116        60
OIR    2025130    131400   -8.9300 -137.2800      15.2       121       117        60
OIR    2025130    131400   -8.9300 -137.2900      15.2       122       119        60
OIR    2025130    131400   -8.9300 -137.3000      15.2       122       120        60
OIR    2025130    131400   -8.9300 -137.3100      15.2       122       125        60
OIR    2025130    131400   -8.9300 -137.3200      15.2       122       127        60
OIR    2025130    131400   -8.9300 -137.3300      15.2       122       125        60
OIR    2025130    131400   -8.9300 -137.3400      15.2       122       123        60
OIR    2025130    131400   -8.9300 -137.3500      15.2       122       121        60
OIR    2025130    131400   -8.9300 -137.3600      15.1       122       121        60
OIR    2025130    131400   -8.9300 -137.3700      15.1       122       122        60
OIR    2025130    131400   -8.9300 -137.3800      15.1       121       123        60
OIR    2025130    131400   -8.9300 -137.3900      14.7       121       126        60
OIR    2025130    131400   -8.9300 -137.4000      14.4       121       131        60
OIR    2025130    131400   -8.9300 -137.4100      14.2       120       136        60
OIR    2025130    131400   -8.9300 -138.0900      48.5       143       134        60
OIR    2025130    131400   -8.9300 -138.1000      35.7       138       122        60
OIR    2025130    131400   -8.9300 -138.1100      22.2       132       115        60
OIR    2025130    131400   -8.9300 -138.1200      13.7       117       110        60
OIR    2025130    131400   -8.9300 -138.1300      12.4       107       107        60
OIR    2025130    131400   -8.9300 -138.1400      11.8       101       103        60
OIR    2025130    131400   -8.9300 -138.1500       8.3        85       103        60
OIR    2025130    131400   -8.9300 -138.1600       8.3        84       103        60
OIR    2025130    131400   -8.9300 -138.1700       8.3        84       103        60
OIR    2025130    131400   -8.9300 -138.1800       8.3        83       104        60
OIR    2025130    131400   -8.9300 -138.1900       8.3        83       105        60
OIR    2025130    131400   -8.9300 -138.2000       8.3        83       104        60
OIR    2025130    131400   -8.9300 -138.2100       8.2        83       103        60
OIR    2025130    131400   -8.9300 -138.2200       8.2        82       103        60
OIR    2025130    131400   -8.9300 -138.2300       8.2        82       103        60
OIR    2025130    131400   -8.9300 -138.2400       8.2        81       103        60
OIR    2025130    131400   -8.9300 -138.2500       8.2        81       103        60
OIR    2025130    131400   -8.9300 -138.2600       8.3        80       103        60
OIR    2025130    131400   -8.9300 -138.2700       8.3        78       103        60
OIR    2025130    131400   -8.9300 -138.2800       8.4        76       103        60
OIR    2025130    131400   -8.9300 -138.2900       8.4        74       103        60
OIR    2025130    131400   -8.9300 -138.3000       8.5        72       104        60
OIR    2025130    131400   -8.9300 -138.3100       8.6        70       103        60
OIR    2025130    131400   -8.9300 -138.3200       8.7        67       103        60
OIR    2025130    131400   -8.9300 -138.3300       8.9        59       103        60
OIR    2025130    131400   -8.9300 -138.3400       9.8        41       103        60
OIR    2025130    131400   -8.9300 -138.3500      13.6         8       103        60
OIR    2025130    131400   -8.9300 -138.3600      17.5       359       103        60
OIR    2025130    131400   -8.9300 -138.3700      19.0       358       103        60
OIR    2025130    131400   -8.9300 -138.3800      19.6       358       103        60
OIR    2025130    131400   -8.9300 -138.3900      19.5       358       103        60
OIR    2025130    131400   -8.9300 -138.4000      19.1       357       103        60
OIR    2025130    131400   -8.9300 -138.4100      18.7       358       103        60
OIR    2025130    131400   -8.9300 -138.4200      18.3       358       103        60
OIR    2025130    131400   -8.9300 -138.4300      18.0       359       103        60
OIR    2025130    131400   -8.9300 -138.4400      17.7       359       103        60
OIR    2025130    131400   -8.9300 -138.4500      17.6       359       103        60
OIR    2025130    131400   -8.9300 -138.4600      17.7       358       103        60
OIR    2025130    131400   -8.9300 -138.4700      17.8       358       103        60
OIR    2025130    131400   -8.9300 -138.4800      17.8       358       104        60
OIR    2025130    131400   -8.9300 -138.4900      17.7       357       104        60
OIR    2025130    131400   -8.9300 -138.5000      17.8       357       103        60
OIR    2025130    131400   -8.9300 -138.5100      18.1       356       103        60
OIR    2025130    131400   -8.9300 -138.5200      18.6       356       103        60
OIR    2025130    131400   -8.9300 -138.5300      19.2       356       104        60
OIR    2025130    131400   -8.9300 -138.5400      19.3       356       104        60
OIR    2025130    131400   -8.9300 -138.5500      19.0       355       104        60
OIR    2025130    131400   -8.9300 -138.5600      18.5       355       107        60
OIR    2025130    131400   -8.9300 -138.5700      18.1       355       109        60
OIR    2025130    131400   -8.9300 -138.5800      17.8       355       111        60
OIR    2025130    131400   -8.9300 -138.5900      17.7       354       113        60
OIR    2025130    131400   -8.9300 -138.6000      17.5       354       113        60
OIR    2025130    131400   -8.9300 -138.6100      17.3       353       113        60
OIR    2025130    131400   -8.9300 -138.6200      17.0       352       111        60
OIR    2025130    131400   -8.9300 -138.6300      16.8       351       108        60
OIR    2025130    131400   -8.9300 -138.6400      16.7       350       105        60
OIR    2025130    131400   -8.9300 -138.6500      16.6       349       103        60
OIR    2025130    131400   -8.9300 -138.6600      16.6       348       103        60
OIR    2025130    131400   -8.9300 -138.6700      16.6       347       103        60
OIR    2025130    131400   -8.9300 -138.6800      16.6       345       103        60
OIR    2025130    131400   -8.9300 -138.6900      16.6       344       103        60
OIR    2025130    131400   -8.9300 -138.7000      16.5       343       103        60
OIR    2025130    131400   -8.9300 -138.7100      16.4       342       103        60
OIR    2025130    131400   -8.9300 -138.7200      16.1       340       104        60
OIR    2025130    131400   -8.9300 -138.7300      15.8       338       107        60
OIR    2025130    131400   -8.9300 -138.7400      15.6       337       111        60
OIR    2025130    131400   -8.9300 -138.7500      15.4       336       113        60
OIR    2025130    131400   -8.9300 -138.7600      15.2       336       115        60
OIR    2025130    131400   -8.9300 -138.7700      14.9       335       116        60
OIR    2025130    131400   -8.9300 -138.7800      14.5       333       119        60
OIR    2025130    131400   -8.9300 -138.7900      13.8       330       124        60
OIR    2025130    131400   -8.9300 -138.8000      13.2       329       127        60
OIR    2025130    131400   -8.9300 -138.8100      12.8       328       127        60
OIR    2025130    131400   -8.9300 -138.8200      12.5       327       129        60
OIR    2025130    131400   -8.9300 -138.8300      12.3       326       132        60
OIR    2025130    131400   -8.9300 -138.8400      12.2       325       134        60
OIR    2025130    131400   -8.9300 -138.8500      12.2       325       135        60
OIR    2025130    131400   -8.9300 -138.8600      12.2       325       135        60
OIR    2025130    131400   -8.9300 -138.8700      12.2       324       134        60
OIR    2025130    131400   -8.9300 -138.8800      12.2       324       132        60
OIR    2025130    131400   -8.9300 -138.8900      12.2       323       132        60
OIR    2025130    131400   -8.9300 -138.9000      12.5       316       140        60
OIR    2025130    131400   -8.9400 -136.5000      32.7       107       143        60
OIR    2025130    131400   -8.9400 -136.5100      32.6       108       142        60
OIR    2025130    131400   -8.9400 -136.5200      32.6       108       138        60
OIR    2025130    131400   -8.9400 -136.5300      32.5       108       134        60
OIR    2025130    131400   -8.9400 -136.5400      32.5       108       132        60
OIR    2025130    131400   -8.9400 -136.5500      32.5       108       130        60
OIR    2025130    131400   -8.9400 -136.5600      32.5       108       129        60
OIR    2025130    131400   -8.9400 -136.5700      32.3       108       130        60
OIR    2025130    131400   -8.9400 -136.5800      32.0       109       130        60
OIR    2025130    131400   -8.9400 -136.5900      31.7       109       131        60
OIR    2025130    131400   -8.9400 -136.6000      31.5       109       132        60
OIR    2025130    131400   -8.9400 -136.6100      30.7       110       133        60
OIR    2025130    131400   -8.9400 -136.6200      30.1       110       135        60
OIR    2025130    131400   -8.9400 -136.6300      29.4       110       141        60
OIR    2025130    131400   -8.9400 -136.6700      26.0       111       139        60
OIR    2025130    131400   -8.9400 -136.6800      26.0       111       136        60
OIR    2025130    131400   -8.9400 -136.6900      25.9       111       136        60
OIR    2025130    131400   -8.9400 -136.7000      25.9       111       136        60
OIR    2025130    131400   -8.9400 -136.7100      25.9       111       138        60
OIR    2025130    131400   -8.9400 -136.7200      25.9       111       137        60
OIR    2025130    131400   -8.9400 -136.7300      25.8       111       134        60
OIR    2025130    131400   -8.9400 -136.7400      25.7       111       135        60
OIR    2025130    131400   -8.9400 -136.7500      25.6       111       136        60
OIR    2025130    131400   -8.9400 -136.7600      25.2       111       137        60
OIR    2025130    131400   -8.9400 -136.7700      24.9       111       138        60
OIR    2025130    131400   -8.9400 -136.7800      24.5       112       143        60
OIR    2025130    131400   -8.9400 -136.7900      23.8       112       144        60
OIR    2025130    131400   -8.9400 -136.8000      22.7       112       144        60
OIR    2025130    131400   -8.9400 -136.8100      21.4       113       145        60
OIR    2025130    131400   -8.9400 -136.8400      16.5       117       144        60
OIR    2025130    131400   -8.9400 -136.8500      16.3       118       144        60
OIR    2025130    131400   -8.9400 -136.8600      16.0       118       145        60
OIR    2025130    131400   -8.9400 -136.8700      15.8       119       143        60
OIR    2025130    131400   -8.9400 -136.8800      15.7       119       140        60
OIR    2025130    131400   -8.9400 -136.8900      15.5       120       140        60
OIR    2025130    131400   -8.9400 -136.9000      15.5       120       139        60
OIR    2025130    131400   -8.9400 -136.9100      15.4       120       136        60
OIR    2025130    131400   -8.9400 -136.9200      15.3       120       135        60
OIR    2025130    131400   -8.9400 -136.9300      15.3       120       135        60
OIR    2025130    131400   -8.9400 -136.9400      15.3       120       132        60
OIR    2025130    131400   -8.9400 -136.9500      15.3       120       129        60
OIR    2025130    131400   -8.9400 -136.9600      15.3       120       128        60
OIR    2025130    131400   -8.9400 -136.9700      15.3       120       127        60
OIR    2025130    131400   -8.9400 -136.9800      15.3       120       127        60
OIR    2025130    131400   -8.9400 -136.9900      15.3       120       127        60
OIR    2025130    131400   -8.9400 -137.0000      15.3       120       126        60
OIR    2025130    131400   -8.9400 -137.0100      15.3       120       125        60
OIR    2025130    131400   -8.9400 -137.0200      15.3       120       124        60
OIR    2025130    131400   -8.9400 -137.0300      15.3       120       124        60
OIR    2025130    131400   -8.9400 -137.0400      15.3       121       124        60
OIR    2025130    131400   -8.9400 -137.0500      15.3       121       124        60
OIR    2025130    131400   -8.9400 -137.0600      15.2       121       125        60
OIR    2025130    131400   -8.9400 -137.0700      15.2       121       123        60
OIR    2025130    131400   -8.9400 -137.0800      15.2       121       122        60
OIR    2025130    131400   -8.9400 -137.0900      15.2       121       121        60
OIR    2025130    131400   -8.9400 -137.1000      15.2       121       120        60
OIR    2025130    131400   -8.9400 -137.1100      15.2       121       119        60
OIR    2025130    131400   -8.9400 -137.1200      15.2       121       119        60
OIR    2025130    131400   -8.9400 -137.1300      15.2       121       119        60
OIR    2025130    131400   -8.9400 -137.1400      15.2       121       121        60
OIR    2025130    131400   -8.9400 -137.1500      15.2       121       123        60
OIR    2025130    131400   -8.9400 -137.1600      15.2       121       123        60
OIR    2025130    131400   -8.9400 -137.1700      15.3       121       123        60
OIR    2025130    131400   -8.9400 -137.1800      15.3       121       122        60
OIR    2025130    131400   -8.9400 -137.1900      15.3       121       121        60
OIR    2025130    131400   -8.9400 -137.2000      15.3       121       120        60
OIR    2025130    131400   -8.9400 -137.2100      15.2       121       120        60
OIR    2025130    131400   -8.9400 -137.2200      15.2       121       120        60
OIR    2025130    131400   -8.9400 -137.2300      15.2       121       122        60
OIR    2025130    131400   -8.9400 -137.2400      15.2       121       123        60
OIR    2025130    131400   -8.9400 -137.2500      15.2       121       122        60
OIR    2025130    131400   -8.9400 -137.2600      15.2       121       116        60
OIR    2025130    131400   -8.9400 -137.2700      15.2       121       116        60
OIR    2025130    131400   -8.9400 -137.2800      15.2       121       116        60
OIR    2025130    131400   -8.9400 -137.2900      15.2       121       117        60
OIR    2025130    131400   -8.9400 -137.3000      15.2       122       119        60
OIR    2025130    131400   -8.9400 -137.3100      15.2       122       124        60
OIR    2025130    131400   -8.9400 -137.3200      15.2       122       126        60
OIR    2025130    131400   -8.9400 -137.3300      15.2       122       123        60
OIR    2025130    131400   -8.9400 -137.3400      15.2       122       122        60
OIR    2025130    131400   -8.9400 -137.3500      15.2       122       122        60
OIR    2025130    131400   -8.9400 -137.3600      15.2       122       122        60
OIR    2025130    131400   -8.9400 -137.3700      15.1       122       123        60
OIR    2025130    131400   -8.9400 -137.3800      15.1       121       124        60
OIR    2025130    131400   -8.9400 -137.3900      14.9       121       127        60
OIR    2025130    131400   -8.9400 -137.4000      14.6       121       132        60
OIR    2025130    131400   -8.9400 -137.4100      14.4       120       138        60
OIR    2025130    131400   -8.9400 -137.4200      14.3       119       147        60
OIR    2025130    131400   -8.9400 -137.8700       7.1       145       145        60
OIR    2025130    131400   -8.9400 -138.1000      35.9       134       134        60
OIR    2025130    131400   -8.9400 -138.1100      23.8       129       121        60
OIR    2025130    131400   -8.9400 -138.1200      16.3       118       109        60
OIR    2025130    131400   -8.9400 -138.1300      13.4       106       104        60
OIR    2025130    131400   -8.9400 -138.1400      12.5        99       103        60
OIR    2025130    131400   -8.9400 -138.1500       8.3        84       103        60
OIR    2025130    131400   -8.9400 -138.1600       8.3        84       103        60
OIR    2025130    131400   -8.9400 -138.1700       8.3        84       103        60
OIR    2025130    131400   -8.9400 -138.1800       8.3        83       104        60
OIR    2025130    131400   -8.9400 -138.1900       8.3        83       104        60
OIR    2025130    131400   -8.9400 -138.2000       8.2        82       104        60
OIR    2025130    131400   -8.9400 -138.2100       8.2        82       103        60
OIR    2025130    131400   -8.9400 -138.2200       8.2        81       103        60
OIR    2025130    131400   -8.9400 -138.2300       8.2        80       103        60
OIR    2025130    131400   -8.9400 -138.2400       8.2        79       103        60
OIR    2025130    131400   -8.9400 -138.2500       8.2        78       103        60
OIR    2025130    131400   -8.9400 -138.2600       8.3        76       103        60
OIR    2025130    131400   -8.9400 -138.2700       8.4        73       103        60
OIR    2025130    131400   -8.9400 -138.2800       8.5        71       103        60
OIR    2025130    131400   -8.9400 -138.2900       8.6        69       103        60
OIR    2025130    131400   -8.9400 -138.3000       8.7        68       103        60
OIR    2025130    131400   -8.9400 -138.3100       8.8        66       103        60
OIR    2025130    131400   -8.9400 -138.3200       9.0        62       103        60
OIR    2025130    131400   -8.9400 -138.3300       9.9        50       104        60
OIR    2025130    131400   -8.9400 -138.3400      12.8        28       107        60
OIR    2025130    131400   -8.9400 -138.3500      19.2       359       105        60
OIR    2025130    131400   -8.9400 -138.3600      21.3       356       105        60
OIR    2025130    131400   -8.9400 -138.3700      21.8       356       104        60
OIR    2025130    131400   -8.9400 -138.3800      21.9       356       103        60
OIR    2025130    131400   -8.9400 -138.3900      21.7       356       103        60
OIR    2025130    131400   -8.9400 -138.4000      21.3       356       103        60
OIR    2025130    131400   -8.9400 -138.4100      20.8       356       103        60
OIR    2025130    131400   -8.9400 -138.4200      20.4       357       103        60
OIR    2025130    131400   -8.9400 -138.4300      19.9       358       103        60
OIR    2025130    131400   -8.9400 -138.4400      19.2       358       103        60
OIR    2025130    131400   -8.9400 -138.4500      18.5       358       103        60
OIR    2025130    131400   -8.9400 -138.4600      18.2       358       103        60
OIR    2025130    131400   -8.9400 -138.4700      18.1       358       103        60
OIR    2025130    131400   -8.9400 -138.4800      18.0       358       103        60
OIR    2025130    131400   -8.9400 -138.4900      18.0       357       104        60
OIR    2025130    131400   -8.9400 -138.5000      18.2       357       104        60
OIR    2025130    131400   -8.9400 -138.5100      18.8       357       105        60
OIR    2025130    131400   -8.9400 -138.5200      19.7       356       107        60
OIR    2025130    131400   -8.9400 -138.5300      20.7       356       107        60
OIR    2025130    131400   -8.9400 -138.5400      21.2       356       107        60
OIR    2025130    131400   -8.9400 -138.5500      21.2       356       105        60
OIR    2025130    131400   -8.9400 -138.5600      20.6       356       104        60
OIR    2025130    131400   -8.9400 -138.5700      19.8       356       107        60
OIR    2025130    131400   -8.9400 -138.5800      19.0       355       108        60
OIR    2025130    131400   -8.9400 -138.5900      18.5       354       108        60
OIR    2025130    131400   -8.9400 -138.6000      18.1       354       108        60
OIR    2025130    131400   -8.9400 -138.6100      17.8       353       108        60
OIR    2025130    131400   -8.9400 -138.6200      17.5       352       107        60
OIR    2025130    131400   -8.9400 -138.6300      17.2       351       104        60
OIR    2025130    131400   -8.9400 -138.6400      17.1       350       104        60
OIR    2025130    131400   -8.9400 -138.6500      17.0       349       103        60
OIR    2025130    131400   -8.9400 -138.6600      16.9       348       103        60
OIR    2025130    131400   -8.9400 -138.6700      16.9       346       103        60
OIR    2025130    131400   -8.9400 -138.6800      16.9       345       103        60
OIR    2025130    131400   -8.9400 -138.6900      16.9       344       103        60
OIR    2025130    131400   -8.9400 -138.7000      16.8       343       103        60
OIR    2025130    131400   -8.9400 -138.7100      16.8       342       104        60
OIR    2025130    131400   -8.9400 -138.7200      16.7       341       105        60
OIR    2025130    131400   -8.9400 -138.7300      16.5       339       108        60
OIR    2025130    131400   -8.9400 -138.7400      16.1       338       110        60
OIR    2025130    131400   -8.9400 -138.7500      15.8       337       111        60
OIR    2025130    131400   -8.9400 -138.7600      15.5       337       113        60
OIR    2025130    131400   -8.9400 -138.7700      15.2       336       114        60
OIR    2025130    131400   -8.9400 -138.7800      14.8       335       116        60
OIR    2025130    131400   -8.9400 -138.7900      14.3       333       121        60
OIR    2025130    131400   -8.9400 -138.8000      13.6       331       124        60
OIR    2025130    131400   -8.9400 -138.8100      13.1       330       127        60
OIR    2025130    131400   -8.9400 -138.8200      12.8       329       128        60
OIR    2025130    131400   -8.9400 -138.8300      12.5       327       129        60
OIR    2025130    131400   -8.9400 -138.8400      12.3       326       132        60
OIR    2025130    131400   -8.9400 -138.8500      12.2       325       134        60
OIR    2025130    131400   -8.9400 -138.8600      12.2       325       135        60
OIR    2025130    131400   -8.9400 -138.8700      12.2       324       134        60
OIR    2025130    131400   -8.9400 -138.8800      12.2       324       133        60
OIR    2025130    131400   -8.9400 -138.8900      12.3       322       132        60
OIR    2025130    131400   -8.9400 -138.9000      12.6       311       136        60
OIR    2025130    131400   -8.9500 -136.4900      33.4       108       140        60
OIR    2025130    131400   -8.9500 -136.5000      33.6       108       137        60
OIR    2025130    131400   -8.9500 -136.5100      33.6       108       137        60
OIR    2025130    131400   -8.9500 -136.5200      33.5       108       135        60
OIR    2025130    131400   -8.9500 -136.5300      33.2       108       133        60
OIR    2025130    131400   -8.9500 -136.5400      33.0       108       131        60
OIR    2025130    131400   -8.9500 -136.5500      33.0       108       129        60
OIR    2025130    131400   -8.9500 -136.5600      32.9       108       128        60
OIR    2025130    131400   -8.9500 -136.5700      32.7       108       129        60
OIR    2025130    131400   -8.9500 -136.5800      32.5       108       130        60
OIR    2025130    131400   -8.9500 -136.5900      32.1       109       131        60
OIR    2025130    131400   -8.9500 -136.6000      31.8       109       132        60
OIR    2025130    131400   -8.9500 -136.6100      31.3       109       132        60
OIR    2025130    131400   -8.9500 -136.6200      30.6       110       134        60
OIR    2025130    131400   -8.9500 -136.6300      29.8       110       139        60
OIR    2025130    131400   -8.9500 -136.6700      26.0       111       142        60
OIR    2025130    131400   -8.9500 -136.6800      26.0       111       137        60
OIR    2025130    131400   -8.9500 -136.6900      26.0       111       135        60
OIR    2025130    131400   -8.9500 -136.7000      26.0       111       134        60
OIR    2025130    131400   -8.9500 -136.7100      26.0       111       137        60
OIR    2025130    131400   -8.9500 -136.7200      25.9       111       137        60
OIR    2025130    131400   -8.9500 -136.7300      25.9       111       136        60
OIR    2025130    131400   -8.9500 -136.7400      25.9       111       136        60
OIR    2025130    131400   -8.9500 -136.7500      25.8       111       136        60
OIR    2025130    131400   -8.9500 -136.7600      25.5       111       135        60
OIR    2025130    131400   -8.9500 -136.7700      25.3       111       135        60
OIR    2025130    131400   -8.9500 -136.7800      24.9       111       139        60
OIR    2025130    131400   -8.9500 -136.7900      24.2       112       142        60
OIR    2025130    131400   -8.9500 -136.8000      23.3       112       144        60
OIR    2025130    131400   -8.9500 -136.8100      22.0       113       146        60
OIR    2025130    131400   -8.9500 -136.8300      17.4       116       145        60
OIR    2025130    131400   -8.9500 -136.8400      16.7       117       142        60
OIR    2025130    131400   -8.9500 -136.8500      16.4       117       144        60
OIR    2025130    131400   -8.9500 -136.8600      16.1       117       145        60
OIR    2025130    131400   -8.9500 -136.8700      15.9       118       142        60
OIR    2025130    131400   -8.9500 -136.8800      15.7       118       138        60
OIR    2025130    131400   -8.9500 -136.8900      15.6       119       138        60
OIR    2025130    131400   -8.9500 -136.9000      15.4       119       137        60
OIR    2025130    131400   -8.9500 -136.9100      15.4       120       136        60
OIR    2025130    131400   -8.9500 -136.9200      15.3       120       135        60
OIR    2025130    131400   -8.9500 -136.9300      15.3       120       134        60
OIR    2025130    131400   -8.9500 -136.9400      15.3       120       131        60
OIR    2025130    131400   -8.9500 -136.9500      15.3       120       128        60
OIR    2025130    131400   -8.9500 -136.9600      15.3       120       128        60
OIR    2025130    131400   -8.9500 -136.9700      15.3       120       128        60
OIR    2025130    131400   -8.9500 -136.9800      15.3       120       127        60
OIR    2025130    131400   -8.9500 -136.9900      15.3       120       126        60
OIR    2025130    131400   -8.9500 -137.0000      15.3       120       126        60
OIR    2025130    131400   -8.9500 -137.0100      15.3       120       124        60
OIR    2025130    131400   -8.9500 -137.0200      15.3       120       122        60
OIR    2025130    131400   -8.9500 -137.0300      15.3       120       121        60
OIR    2025130    131400   -8.9500 -137.0400      15.3       120       122        60
OIR    2025130    131400   -8.9500 -137.0500      15.3       120       122        60
OIR    2025130    131400   -8.9500 -137.0600      15.2       120       122        60
OIR    2025130    131400   -8.9500 -137.0700      15.2       120       122        60
OIR    2025130    131400   -8.9500 -137.0800      15.2       121       123        60
OIR    2025130    131400   -8.9500 -137.0900      15.2       121       122        60
OIR    2025130    131400   -8.9500 -137.1000      15.2       121       120        60
OIR    2025130    131400   -8.9500 -137.1100      15.2       121       117        60
OIR    2025130    131400   -8.9500 -137.1200      15.2       121       117        60
OIR    2025130    131400   -8.9500 -137.1300      15.2       121       117        60
OIR    2025130    131400   -8.9500 -137.1400      15.2       121       120        60
OIR    2025130    131400   -8.9500 -137.1500      15.2       121       122        60
OIR    2025130    131400   -8.9500 -137.1600      15.3       121       121        60
OIR    2025130    131400   -8.9500 -137.1700      15.3       121       121        60
OIR    2025130    131400   -8.9500 -137.1800      15.3       121       120        60
OIR    2025130    131400   -8.9500 -137.1900      15.3       121       120        60
OIR    2025130    131400   -8.9500 -137.2000      15.3       121       120        60
OIR    2025130    131400   -8.9500 -137.2100      15.3       121       121        60
OIR    2025130    131400   -8.9500 -137.2200      15.3       121       121        60
OIR    2025130    131400   -8.9500 -137.2300      15.3       121       122        60
OIR    2025130    131400   -8.9500 -137.2400      15.2       121       123        60
OIR    2025130    131400   -8.9500 -137.2500      15.2       121       122        60
OIR    2025130    131400   -8.9500 -137.2600      15.2       121       116        60
OIR    2025130    131400   -8.9500 -137.2700      15.2       121       116        60
OIR    2025130    131400   -8.9500 -137.2800      15.2       121       116        60
OIR    2025130    131400   -8.9500 -137.2900      15.2       121       116        60
OIR    2025130    131400   -8.9500 -137.3000      15.2       121       119        60
OIR    2025130    131400   -8.9500 -137.3100      15.2       122       123        60
OIR    2025130    131400   -8.9500 -137.3200      15.2       122       125        60
OIR    2025130    131400   -8.9500 -137.3300      15.2       122       122        60
OIR    2025130    131400   -8.9500 -137.3400      15.2       122       122        60
OIR    2025130    131400   -8.9500 -137.3500      15.2       122       123        60
OIR    2025130    131400   -8.9500 -137.3600      15.2       122       124        60
OIR    2025130    131400   -8.9500 -137.3700      15.2       122       124        60
OIR    2025130    131400   -8.9500 -137.3800      15.2       121       126        60
OIR    2025130    131400   -8.9500 -137.3900      15.0       121       128        60
OIR    2025130    131400   -8.9500 -137.4000      14.8       121       133        60
OIR    2025130    131400   -8.9500 -137.4100      14.6       120       139        60
OIR    2025130    131400   -8.9500 -137.4200      14.5       119       144        60
OIR    2025130    131400   -8.9500 -137.5500      19.7       142       144        60
OIR    2025130    131400   -8.9500 -137.5600      19.4       144       137        60
OIR    2025130    131400   -8.9500 -137.5700      18.3       148       130        60
OIR    2025130    131400   -8.9500 -137.5800      17.8       156       129        60
OIR    2025130    131400   -8.9500 -137.5900      17.2       168       127        60
OIR    2025130    131400   -8.9500 -137.6000      13.8       190       132        60
OIR    2025130    131400   -8.9500 -137.6100       9.9       206       138        60
OIR    2025130    131400   -8.9500 -137.8600       8.4       161       145        60
OIR    2025130    131400   -8.9500 -137.8700       6.9       158       139        60
OIR    2025130    131400   -8.9500 -137.8800       6.3       152       147        60
OIR    2025130    131400   -8.9500 -138.1000      35.5       125       145        60
OIR    2025130    131400   -8.9500 -138.1100      22.1       118       126        60
OIR    2025130    131400   -8.9500 -138.1200      17.4       112       109        60
OIR    2025130    131400   -8.9500 -138.1300      14.9        97       104        60
OIR    2025130    131400   -8.9500 -138.1400      13.9        93       103        60
OIR    2025130    131400   -8.9500 -138.1500       8.4        84       103        60
OIR    2025130    131400   -8.9500 -138.1600       8.3        84       103        60
OIR    2025130    131400   -8.9500 -138.1700       8.3        83       103        60
OIR    2025130    131400   -8.9500 -138.1800       8.2        83       103        60
OIR    2025130    131400   -8.9500 -138.1900       8.2        82       103        60
OIR    2025130    131400   -8.9500 -138.2000       8.2        81       103        60
OIR    2025130    131400   -8.9500 -138.2100       8.2        81       103        60
OIR    2025130    131400   -8.9500 -138.2200       8.2        79       103        60
OIR    2025130    131400   -8.9500 -138.2300       8.2        77       103        60
OIR    2025130    131400   -8.9500 -138.2400       8.3        75       103        60
OIR    2025130    131400   -8.9500 -138.2500       8.3        73       103        60
OIR    2025130    131400   -8.9500 -138.2600       8.4        71       103        60
OIR    2025130    131400   -8.9500 -138.2700       8.5        69       103        60
OIR    2025130    131400   -8.9500 -138.2800       8.7        68       103        60
OIR    2025130    131400   -8.9500 -138.2900       8.8        66       103        60
OIR    2025130    131400   -8.9500 -138.3000       8.9        65       103        60
OIR    2025130    131400   -8.9500 -138.3100       9.0        63       103        60
OIR    2025130    131400   -8.9500 -138.3200       9.4        56       103        60
OIR    2025130    131400   -8.9500 -138.3300      11.5        37       105        60
OIR    2025130    131400   -8.9500 -138.3400      18.0        13       109        60
OIR    2025130    131400   -8.9500 -138.3500      22.1       357       109        60
OIR    2025130    131400   -8.9500 -138.3600      22.3       356       107        60
OIR    2025130    131400   -8.9500 -138.3700      22.3       356       104        60
OIR    2025130    131400   -8.9500 -138.3800      22.2       356       103        60
OIR    2025130    131400   -8.9500 -138.3900      22.1       356       103        60
OIR    2025130    131400   -8.9500 -138.4000      22.1       356       103        60
OIR    2025130    131400   -8.9500 -138.4100      21.9       356       103        60
OIR    2025130    131400   -8.9500 -138.4200      21.9       356       103        60
OIR    2025130    131400   -8.9500 -138.4300      21.9       356       103        60
OIR    2025130    131400   -8.9500 -138.4400      21.9       356       103        60
OIR    2025130    131400   -8.9500 -138.4500      21.6       357       103        60
OIR    2025130    131400   -8.9500 -138.4600      20.6       357       103        60
OIR    2025130    131400   -8.9500 -138.4700      19.0       357       103        60
OIR    2025130    131400   -8.9500 -138.4800      18.2       357       103        60
OIR    2025130    131400   -8.9500 -138.4900      18.1       357       104        60
OIR    2025130    131400   -8.9500 -138.5000      18.6       357       105        60
OIR    2025130    131400   -8.9500 -138.5100      19.5       357       107        60
OIR    2025130    131400   -8.9500 -138.5200      21.3       357       109        60
OIR    2025130    131400   -8.9500 -138.5300      23.1       357       110        60
OIR    2025130    131400   -8.9500 -138.5400      24.0       357       110        60
OIR    2025130    131400   -8.9500 -138.5500      24.0       357       107        60
OIR    2025130    131400   -8.9500 -138.5600      23.2       357       104        60
OIR    2025130    131400   -8.9500 -138.5700      22.1       356       104        60
OIR    2025130    131400   -8.9500 -138.5800      20.6       356       104        60
OIR    2025130    131400   -8.9500 -138.5900      19.5       355       104        60
OIR    2025130    131400   -8.9500 -138.6000      18.8       354       104        60
OIR    2025130    131400   -8.9500 -138.6100      18.4       353       104        60
OIR    2025130    131400   -8.9500 -138.6200      18.0       352       104        60
OIR    2025130    131400   -8.9500 -138.6300      17.7       351       103        60
OIR    2025130    131400   -8.9500 -138.6400      17.5       350       103        60
OIR    2025130    131400   -8.9500 -138.6500      17.3       349       103        60
OIR    2025130    131400   -8.9500 -138.6600      17.2       348       103        60
OIR    2025130    131400   -8.9500 -138.6700      17.2       346       103        60
OIR    2025130    131400   -8.9500 -138.6800      17.2       345       103        60
OIR    2025130    131400   -8.9500 -138.6900      17.2       344       103        60
OIR    2025130    131400   -8.9500 -138.7000      17.1       343       104        60
OIR    2025130    131400   -8.9500 -138.7100      17.1       342       105        60
OIR    2025130    131400   -8.9500 -138.7200      17.0       341       109        60
OIR    2025130    131400   -8.9500 -138.7300      16.8       340       109        60
OIR    2025130    131400   -8.9500 -138.7400      16.6       339       108        60
OIR    2025130    131400   -8.9500 -138.7500      16.2       338       110        60
OIR    2025130    131400   -8.9500 -138.7600      15.8       337       111        60
OIR    2025130    131400   -8.9500 -138.7700      15.4       336       112        60
OIR    2025130    131400   -8.9500 -138.7800      15.0       335       113        60
OIR    2025130    131400   -8.9500 -138.7900      14.6       334       117        60
OIR    2025130    131400   -8.9500 -138.8000      14.1       333       122        60
OIR    2025130    131400   -8.9500 -138.8100      13.5       332       126        60
OIR    2025130    131400   -8.9500 -138.8200      13.1       330       127        60
OIR    2025130    131400   -8.9500 -138.8300      12.7       329       127        60
OIR    2025130    131400   -8.9500 -138.8400      12.4       327       130        60
OIR    2025130    131400   -8.9500 -138.8500      12.3       326       133        60
OIR    2025130    131400   -8.9500 -138.8600      12.2       325       134        60
OIR    2025130    131400   -8.9500 -138.8700      12.2       324       134        60
OIR    2025130    131400   -8.9500 -138.8800      12.2       324       133        60
OIR    2025130    131400   -8.9500 -138.8900      12.2       322       133        60
OIR    2025130    131400   -8.9500 -138.9000      12.4       313       132        60
OIR    2025130    131400   -8.9500 -138.9100      12.4       302       142        60
OIR    2025130    131400   -8.9600 -136.4800      33.8       108       144        60
OIR    2025130    131400   -8.9600 -136.4900      34.1       108       138        60
OIR    2025130    131400   -8.9600 -136.5000      34.2       108       136        60
OIR    2025130    131400   -8.9600 -136.5100      34.1       108       134        60
OIR    2025130    131400   -8.9600 -136.5200      34.0       108       133        60
OIR    2025130    131400   -8.9600 -136.5300      33.7       108       131        60
OIR    2025130    131400   -8.9600 -136.5400      33.6       108       129        60
OIR    2025130    131400   -8.9600 -136.5500      33.4       108       128        60
OIR    2025130    131400   -8.9600 -136.5600      33.3       108       127        60
OIR    2025130    131400   -8.9600 -136.5700      33.0       108       128        60
OIR    2025130    131400   -8.9600 -136.5800      32.9       108       129        60
OIR    2025130    131400   -8.9600 -136.5900      32.4       108       130        60
OIR    2025130    131400   -8.9600 -136.6000      32.2       109       130        60
OIR    2025130    131400   -8.9600 -136.6100      31.8       109       132        60
OIR    2025130    131400   -8.9600 -136.6200      31.2       109       134        60
OIR    2025130    131400   -8.9600 -136.6300      30.4       109       138        60
OIR    2025130    131400   -8.9600 -136.6400      27.0       111       143        60
OIR    2025130    131400   -8.9600 -136.6700      26.0       111       143        60
OIR    2025130    131400   -8.9600 -136.6800      26.0       111       140        60
OIR    2025130    131400   -8.9600 -136.6900      26.0       111       137        60
OIR    2025130    131400   -8.9600 -136.7000      26.0       111       135        60
OIR    2025130    131400   -8.9600 -136.7100      26.0       111       136        60
OIR    2025130    131400   -8.9600 -136.7200      26.0       111       135        60
OIR    2025130    131400   -8.9600 -136.7300      26.0       111       133        60
OIR    2025130    131400   -8.9600 -136.7400      26.0       111       134        60
OIR    2025130    131400   -8.9600 -136.7500      25.9       111       135        60
OIR    2025130    131400   -8.9600 -136.7600      25.8       111       134        60
OIR    2025130    131400   -8.9600 -136.7700      25.7       111       135        60
OIR    2025130    131400   -8.9600 -136.7800      25.4       111       139        60
OIR    2025130    131400   -8.9600 -136.7900      24.6       112       141        60
OIR    2025130    131400   -8.9600 -136.8000      23.8       112       143        60
OIR    2025130    131400   -8.9600 -136.8100      22.5       112       143        60
OIR    2025130    131400   -8.9600 -136.8200      20.8       113       143        60
OIR    2025130    131400   -8.9600 -136.8300      17.8       115       142        60
OIR    2025130    131400   -8.9600 -136.8400      16.9       116       141        60
OIR    2025130    131400   -8.9600 -136.8500      16.5       116       142        60
OIR    2025130    131400   -8.9600 -136.8600      16.2       116       142        60
OIR    2025130    131400   -8.9600 -136.8700      15.9       117       139        60
OIR    2025130    131400   -8.9600 -136.8800      15.7       117       137        60
OIR    2025130    131400   -8.9600 -136.8900      15.6       117       137        60
OIR    2025130    131400   -8.9600 -136.9000      15.4       117       137        60
OIR    2025130    131400   -8.9600 -136.9100      15.3       118       136        60
OIR    2025130    131400   -8.9600 -136.9200      15.3       119       135        60
OIR    2025130    131400   -8.9600 -136.9300      15.2       119       134        60
OIR    2025130    131400   -8.9600 -136.9400      15.2       120       131        60
OIR    2025130    131400   -8.9600 -136.9500      15.2       120       129        60
OIR    2025130    131400   -8.9600 -136.9600      15.3       120       129        60
OIR    2025130    131400   -8.9600 -136.9700      15.3       120       128        60
OIR    2025130    131400   -8.9600 -136.9800      15.3       120       127        60
OIR    2025130    131400   -8.9600 -136.9900      15.3       120       126        60
OIR    2025130    131400   -8.9600 -137.0000      15.3       120       125        60
OIR    2025130    131400   -8.9600 -137.0100      15.3       119       123        60
OIR    2025130    131400   -8.9600 -137.0200      15.4       119       121        60
OIR    2025130    131400   -8.9600 -137.0300      15.4       119       120        60
OIR    2025130    131400   -8.9600 -137.0400      15.3       119       121        60
OIR    2025130    131400   -8.9600 -137.0500      15.3       119       121        60
OIR    2025130    131400   -8.9600 -137.0600      15.2       120       122        60
OIR    2025130    131400   -8.9600 -137.0700      15.2       120       122        60
OIR    2025130    131400   -8.9600 -137.0800      15.2       120       123        60
OIR    2025130    131400   -8.9600 -137.0900      15.2       120       122        60
OIR    2025130    131400   -8.9600 -137.1000      15.2       121       120        60
OIR    2025130    131400   -8.9600 -137.1100      15.2       121       116        60
OIR    2025130    131400   -8.9600 -137.1200      15.2       121       116        60
OIR    2025130    131400   -8.9600 -137.1300      15.2       121       117        60
OIR    2025130    131400   -8.9600 -137.1400      15.3       121       119        60
OIR    2025130    131400   -8.9600 -137.1500      15.3       121       121        60
OIR    2025130    131400   -8.9600 -137.1600      15.3       121       121        60
OIR    2025130    131400   -8.9600 -137.1700      15.3       120       122        60
OIR    2025130    131400   -8.9600 -137.1800      15.3       120       120        60
OIR    2025130    131400   -8.9600 -137.1900      15.3       120       119        60
OIR    2025130    131400   -8.9600 -137.2000      15.3       120       120        60
OIR    2025130    131400   -8.9600 -137.2100      15.3       120       120        60
OIR    2025130    131400   -8.9600 -137.2200      15.3       120       120        60
OIR    2025130    131400   -8.9600 -137.2300      15.3       120       121        60
OIR    2025130    131400   -8.9600 -137.2400      15.3       120       123        60
OIR    2025130    131400   -8.9600 -137.2500      15.2       120       122        60
OIR    2025130    131400   -8.9600 -137.2600      15.2       121       119        60
OIR    2025130    131400   -8.9600 -137.2700      15.2       121       116        60
OIR    2025130    131400   -8.9600 -137.2800      15.2       121       116        60
OIR    2025130    131400   -8.9600 -137.2900      15.2       121       116        60
OIR    2025130    131400   -8.9600 -137.3000      15.2       121       119        60
OIR    2025130    131400   -8.9600 -137.3100      15.2       121       121        60
OIR    2025130    131400   -8.9600 -137.3200      15.2       122       122        60
OIR    2025130    131400   -8.9600 -137.3300      15.3       122       121        60
OIR    2025130    131400   -8.9600 -137.3400      15.3       122       121        60
OIR    2025130    131400   -8.9600 -137.3500      15.3       122       123        60
OIR    2025130    131400   -8.9600 -137.3600      15.3       122       125        60
OIR    2025130    131400   -8.9600 -137.3700      15.3       122       126        60
OIR    2025130    131400   -8.9600 -137.3800      15.3       122       128        60
OIR    2025130    131400   -8.9600 -137.3900      15.2       121       131        60
OIR    2025130    131400   -8.9600 -137.4000      15.1       120       137        60
OIR    2025130    131400   -8.9600 -137.4100      15.0       119       142        60
OIR    2025130    131400   -8.9600 -137.4200      14.9       118       147        60
OIR    2025130    131400   -8.9600 -137.5300      17.0       141       144        60
OIR    2025130    131400   -8.9600 -137.5400      19.0       142       137        60
OIR    2025130    131400   -8.9600 -137.5500      19.6       142       132        60
OIR    2025130    131400   -8.9600 -137.5600      19.9       143       126        60
OIR    2025130    131400   -8.9600 -137.5700      19.7       147       120        60
OIR    2025130    131400   -8.9600 -137.5800      19.4       156       120        60
OIR    2025130    131400   -8.9600 -137.5900      18.8       167       120        60
OIR    2025130    131400   -8.9600 -137.6000      16.4       183       123        60
OIR    2025130    131400   -8.9600 -137.6100       9.7       203       127        60
OIR    2025130    131400   -8.9600 -137.6200       8.4       202       136        60
OIR    2025130    131400   -8.9600 -137.6300       9.1       201       145        60
OIR    2025130    131400   -8.9600 -137.8600       7.3       168       144        60
OIR    2025130    131400   -8.9600 -137.8700       6.3       167       138        60
OIR    2025130    131400   -8.9600 -137.8800       5.6       154       146        60
OIR    2025130    131400   -8.9600 -138.1100      20.5       107       133        60
OIR    2025130    131400   -8.9600 -138.1200      17.1        98       116        60
OIR    2025130    131400   -8.9600 -138.1300      14.6        93       108        60
OIR    2025130    131400   -8.9600 -138.1400      14.0        89       104        60
OIR    2025130    131400   -8.9600 -138.1500       9.2        84       103        60
OIR    2025130    131400   -8.9600 -138.1600       8.4        83       103        60
OIR    2025130    131400   -8.9600 -138.1700       8.2        82       103        60
OIR    2025130    131400   -8.9600 -138.1800       8.2        81       103        60
OIR    2025130    131400   -8.9600 -138.1900       8.1        80       103        60
OIR    2025130    131400   -8.9600 -138.2000       8.1        78       103        60
OIR    2025130    131400   -8.9600 -138.2100       8.1        77       103        60
OIR    2025130    131400   -8.9600 -138.2200       8.1        74       103        60
OIR    2025130    131400   -8.9600 -138.2300       8.2        71       103        60
OIR    2025130    131400   -8.9600 -138.2400       8.3        69       103        60
OIR    2025130    131400   -8.9600 -138.2500       8.5        66       103        60
OIR    2025130    131400   -8.9600 -138.2600       8.6        65       103        60
OIR    2025130    131400   -8.9600 -138.2700       8.7        65       103        60
OIR    2025130    131400   -8.9600 -138.2800       8.8        64       103        60
OIR    2025130    131400   -8.9600 -138.2900       8.9        63       103        60
OIR    2025130    131400   -8.9600 -138.3000       9.0        62       103        60
OIR    2025130    131400   -8.9600 -138.3100       9.4        57       103        60
OIR    2025130    131400   -8.9600 -138.3200      10.5        46       103        60
OIR    2025130    131400   -8.9600 -138.3300      13.6        23       104        60
OIR    2025130    131400   -8.9600 -138.3400      22.4         1       107        60
OIR    2025130    131400   -8.9600 -138.3500      23.0       358       107        60
OIR    2025130    131400   -8.9600 -138.3600      22.6       357       105        60
OIR    2025130    131400   -8.9600 -138.3700      22.5       356       104        60
OIR    2025130    131400   -8.9600 -138.3800      22.5       356       103        60
OIR    2025130    131400   -8.9600 -138.3900      22.3       356       103        60
OIR    2025130    131400   -8.9600 -138.4000      22.2       356       103        60
OIR    2025130    131400   -8.9600 -138.4100      22.1       356       103        60
OIR    2025130    131400   -8.9600 -138.4200      22.0       356       103        60
OIR    2025130    131400   -8.9600 -138.4300      22.0       356       103        60
OIR    2025130    131400   -8.9600 -138.4400      22.0       356       103        60
OIR    2025130    131400   -8.9600 -138.4500      22.0       356       103        60
OIR    2025130    131400   -8.9600 -138.4600      22.0       356       103        60
OIR    2025130    131400   -8.9600 -138.4700      21.9       356       103        60
OIR    2025130    131400   -8.9600 -138.4800      22.0       357       103        60
OIR    2025130    131400   -8.9600 -138.4900      22.3       357       103        60
OIR    2025130    131400   -8.9600 -138.5000      23.0       357       104        60
OIR    2025130    131400   -8.9600 -138.5100      23.9       358       104        60
OIR    2025130    131400   -8.9600 -138.5200      24.5       358       107        60
OIR    2025130    131400   -8.9600 -138.5300      24.8       358       108        60
OIR    2025130    131400   -8.9600 -138.5400      25.0       358       109        60
OIR    2025130    131400   -8.9600 -138.5500      24.9       358       108        60
OIR    2025130    131400   -8.9600 -138.5600      24.6       357       105        60
OIR    2025130    131400   -8.9600 -138.5700      23.7       357       104        60
OIR    2025130    131400   -8.9600 -138.5800      22.5       356       104        60
OIR    2025130    131400   -8.9600 -138.5900      21.2       355       104        60
OIR    2025130    131400   -8.9600 -138.6000      20.0       354       104        60
OIR    2025130    131400   -8.9600 -138.6100      19.2       353       104        60
OIR    2025130    131400   -8.9600 -138.6200      18.7       353       104        60
OIR    2025130    131400   -8.9600 -138.6300      18.3       352       104        60
OIR    2025130    131400   -8.9600 -138.6400      18.0       350       103        60
OIR    2025130    131400   -8.9600 -138.6500      17.7       349       103        60
OIR    2025130    131400   -8.9600 -138.6600      17.6       348       104        60
OIR    2025130    131400   -8.9600 -138.6700      17.5       347       104        60
OIR    2025130    131400   -8.9600 -138.6800      17.4       345       104        60
OIR    2025130    131400   -8.9600 -138.6900      17.4       344       104        60
OIR    2025130    131400   -8.9600 -138.7000      17.3       343       104        60
OIR    2025130    131400   -8.9600 -138.7100      17.2       342       107        60
OIR    2025130    131400   -8.9600 -138.7200      17.1       341       108        60
OIR    2025130    131400   -8.9600 -138.7300      17.0       341       107        60
OIR    2025130    131400   -8.9600 -138.7400      16.9       340       105        60
OIR    2025130    131400   -8.9600 -138.7500      16.6       339       110        60
OIR    2025130    131400   -8.9600 -138.7600      16.2       338       113        60
OIR    2025130    131400   -8.9600 -138.7700      15.6       337       113        60
OIR    2025130    131400   -8.9600 -138.7800      15.2       336       113        60
OIR    2025130    131400   -8.9600 -138.7900      14.8       335       119        60
OIR    2025130    131400   -8.9600 -138.8000      14.4       334       123        60
OIR    2025130    131400   -8.9600 -138.8100      14.0       334       125        60
OIR    2025130    131400   -8.9600 -138.8200      13.5       332       126        60
OIR    2025130    131400   -8.9600 -138.8300      12.9       330       128        60
OIR    2025130    131400   -8.9600 -138.8400      12.6       328       131        60
OIR    2025130    131400   -8.9600 -138.8500      12.4       326       135        60
OIR    2025130    131400   -8.9600 -138.8600      12.3       325       135        60
OIR    2025130    131400   -8.9600 -138.8700      12.3       324       135        60
OIR    2025130    131400   -8.9600 -138.8800      12.3       324       134        60
OIR    2025130    131400   -8.9600 -138.8900      12.2       322       134        60
OIR    2025130    131400   -8.9600 -138.9000      12.1       315       134        60
OIR    2025130    131400   -8.9600 -138.9100      12.9       301       145        60
OIR    2025130    131400   -8.9700 -136.4800      34.4       108       140        60
OIR    2025130    131400   -8.9700 -136.4900      34.7       108       138        60
OIR    2025130    131400   -8.9700 -136.5000      34.7       108       135        60
OIR    2025130    131400   -8.9700 -136.5100      34.6       108       132        60
OIR    2025130    131400   -8.9700 -136.5200      34.4       108       131        60
OIR    2025130    131400   -8.9700 -136.5300      34.2       108       129        60
OIR    2025130    131400   -8.9700 -136.5400      34.0       108       128        60
OIR    2025130    131400   -8.9700 -136.5500      33.8       108       127        60
OIR    2025130    131400   -8.9700 -136.5600      33.6       108       126        60
OIR    2025130    131400   -8.9700 -136.5700      33.3       108       127        60
OIR    2025130    131400   -8.9700 -136.5800      33.2       108       128        60
OIR    2025130    131400   -8.9700 -136.5900      32.8       108       129        60
OIR    2025130    131400   -8.9700 -136.6000      32.6       108       129        60
OIR    2025130    131400   -8.9700 -136.6100      32.2       108       131        60
OIR    2025130    131400   -8.9700 -136.6200      31.8       108       134        60
OIR    2025130    131400   -8.9700 -136.6300      31.0       109       138        60
OIR    2025130    131400   -8.9700 -136.6400      27.9       110       143        60
OIR    2025130    131400   -8.9700 -136.6800      26.0       111       142        60
OIR    2025130    131400   -8.9700 -136.6900      26.0       111       139        60
OIR    2025130    131400   -8.9700 -136.7000      26.0       111       136        60
OIR    2025130    131400   -8.9700 -136.7100      26.0       111       135        60
OIR    2025130    131400   -8.9700 -136.7200      26.0       111       132        60
OIR    2025130    131400   -8.9700 -136.7300      26.0       111       130        60
OIR    2025130    131400   -8.9700 -136.7400      26.0       111       132        60
OIR    2025130    131400   -8.9700 -136.7500      26.0       111       133        60
OIR    2025130    131400   -8.9700 -136.7600      26.0       111       133        60
OIR    2025130    131400   -8.9700 -136.7700      25.9       111       135        60
OIR    2025130    131400   -8.9700 -136.7800      25.7       111       139        60
OIR    2025130    131400   -8.9700 -136.7900      25.1       111       141        60
OIR    2025130    131400   -8.9700 -136.8000      24.2       112       141        60
OIR    2025130    131400   -8.9700 -136.8100      22.7       112       141        60
OIR    2025130    131400   -8.9700 -136.8200      20.7       112       139        60
OIR    2025130    131400   -8.9700 -136.8300      18.3       114       140        60
OIR    2025130    131400   -8.9700 -136.8400      17.1       115       141        60
OIR    2025130    131400   -8.9700 -136.8500      16.6       115       140        60
OIR    2025130    131400   -8.9700 -136.8600      16.2       115       138        60
OIR    2025130    131400   -8.9700 -136.8700      15.9       116       136        60
OIR    2025130    131400   -8.9700 -136.8800      15.7       116       135        60
OIR    2025130    131400   -8.9700 -136.8900      15.6       116       136        60
OIR    2025130    131400   -8.9700 -136.9000      15.5       116       136        60
OIR    2025130    131400   -8.9700 -136.9100      15.3       116       136        60
OIR    2025130    131400   -8.9700 -136.9200      15.2       116       135        60
OIR    2025130    131400   -8.9700 -136.9300      15.2       117       134        60
OIR    2025130    131400   -8.9700 -136.9400      15.2       118       132        60
OIR    2025130    131400   -8.9700 -136.9500      15.2       119       130        60
OIR    2025130    131400   -8.9700 -136.9600      15.2       119       130        60
OIR    2025130    131400   -8.9700 -136.9700      15.3       120       129        60
OIR    2025130    131400   -8.9700 -136.9800      15.3       119       127        60
OIR    2025130    131400   -8.9700 -136.9900      15.3       119       125        60
OIR    2025130    131400   -8.9700 -137.0000      15.4       118       124        60
OIR    2025130    131400   -8.9700 -137.0100      15.4       118       122        60
OIR    2025130    131400   -8.9700 -137.0200      15.5       117       120        60
OIR    2025130    131400   -8.9700 -137.0300      15.5       117       119        60
OIR    2025130    131400   -8.9700 -137.0400      15.4       117       117        60
OIR    2025130    131400   -8.9700 -137.0500      15.4       117       119        60
OIR    2025130    131400   -8.9700 -137.0600      15.3       118       121        60
OIR    2025130    131400   -8.9700 -137.0700      15.2       119       122        60
OIR    2025130    131400   -8.9700 -137.0800      15.1       120       122        60
OIR    2025130    131400   -8.9700 -137.0900      15.1       120       122        60
OIR    2025130    131400   -8.9700 -137.1000      15.1       120       120        60
OIR    2025130    131400   -8.9700 -137.1100      15.2       120       116        60
OIR    2025130    131400   -8.9700 -137.1200      15.2       120       116        60
OIR    2025130    131400   -8.9700 -137.1300      15.4       119       116        60
OIR    2025130    131400   -8.9700 -137.1400      15.5       119       117        60
OIR    2025130    131400   -8.9700 -137.1500      15.4       119       120        60
OIR    2025130    131400   -8.9700 -137.1600      15.4       119       121        60
OIR    2025130    131400   -8.9700 -137.1700      15.5       119       122        60
OIR    2025130    131400   -8.9700 -137.1800      15.4       119       120        60
OIR    2025130    131400   -8.9700 -137.1900      15.4       119       119        60
OIR    2025130    131400   -8.9700 -137.2000      15.4       119       119        60
OIR    2025130    131400   -8.9700 -137.2100      15.4       120       119        60
OIR    2025130    131400   -8.9700 -137.2200      15.3       120       119        60
OIR    2025130    131400   -8.9700 -137.2300      15.3       120       121        60
OIR    2025130    131400   -8.9700 -137.2400      15.3       120       122        60
OIR    2025130    131400   -8.9700 -137.2500      15.3       120       122        60
OIR    2025130    131400   -8.9700 -137.2600      15.2       120       119        60
OIR    2025130    131400   -8.9700 -137.2700      15.2       121       116        60
OIR    2025130    131400   -8.9700 -137.2800      15.2       121       115        60
OIR    2025130    131400   -8.9700 -137.2900      15.2       121       116        60
OIR    2025130    131400   -8.9700 -137.3000      15.2       121       117        60
OIR    2025130    131400   -8.9700 -137.3100      15.2       121       119        60
OIR    2025130    131400   -8.9700 -137.3200      15.3       122       120        60
OIR    2025130    131400   -8.9700 -137.3300      15.4       122       120        60
OIR    2025130    131400   -8.9700 -137.3400      15.4       122       121        60
OIR    2025130    131400   -8.9700 -137.3500      15.4       122       123        60
OIR    2025130    131400   -8.9700 -137.3600      15.6       122       125        60
OIR    2025130    131400   -8.9700 -137.3700      15.7       123       128        60
OIR    2025130    131400   -8.9700 -137.3800      15.6       122       130        60
OIR    2025130    131400   -8.9700 -137.3900      15.4       121       134        60
OIR    2025130    131400   -8.9700 -137.4000      15.3       119       141        60
OIR    2025130    131400   -8.9700 -137.4100      15.2       118       145        60
OIR    2025130    131400   -8.9700 -137.5200      11.2       133       143        60
OIR    2025130    131400   -8.9700 -137.5300      15.0       142       133        60
OIR    2025130    131400   -8.9700 -137.5400      18.2       141       125        60
OIR    2025130    131400   -8.9700 -137.5500      19.7       142       121        60
OIR    2025130    131400   -8.9700 -137.5600      20.0       143       116        60
OIR    2025130    131400   -8.9700 -137.5700      19.1       144       111        60
OIR    2025130    131400   -8.9700 -137.5800      17.9       150       112        60
OIR    2025130    131400   -8.9700 -137.5900      16.1       159       114        60
OIR    2025130    131400   -8.9700 -137.6000      12.3       171       115        60
OIR    2025130    131400   -8.9700 -137.6100       9.2       195       116        60
OIR    2025130    131400   -8.9700 -137.6200       8.8       200       123        60
OIR    2025130    131400   -8.9700 -137.6300       9.2       200       132        60
OIR    2025130    131400   -8.9700 -137.6400      18.6       196       145        60
OIR    2025130    131400   -8.9700 -137.6800      25.7       183       147        60
OIR    2025130    131400   -8.9700 -137.6900      21.9       180       143        60
OIR    2025130    131400   -8.9700 -137.7000      18.1       168       139        60
OIR    2025130    131400   -8.9700 -137.7100      19.5       165       141        60
OIR    2025130    131400   -8.9700 -137.7200      23.9       166       144        60
OIR    2025130    131400   -8.9700 -137.7300      26.3       168       147        60
OIR    2025130    131400   -8.9700 -137.7400      27.0       173       147        60
OIR    2025130    131400   -8.9700 -137.7500      21.1       191       144        60
OIR    2025130    131400   -8.9700 -137.7600      16.3       214       140        60
OIR    2025130    131400   -8.9700 -137.7700      21.9       235       134        60
OIR    2025130    131400   -8.9700 -137.7800      34.8       267       131        60
OIR    2025130    131400   -8.9700 -137.7900      40.4       271       131        60
OIR    2025130    131400   -8.9700 -137.8000      28.9       258       139        60
OIR    2025130    131400   -8.9700 -137.8100      11.0       231       146        60
OIR    2025130    131400   -8.9700 -137.8600       6.2       179       143        60
OIR    2025130    131400   -8.9700 -137.8700       5.7       179       137        60
OIR    2025130    131400   -8.9700 -137.8800       4.9       156       144        60
OIR    2025130    131400   -8.9700 -138.1100      16.4       102       138        60
OIR    2025130    131400   -8.9700 -138.1200      16.4        95       123        60
OIR    2025130    131400   -8.9700 -138.1300      14.2        92       111        60
OIR    2025130    131400   -8.9700 -138.1400      13.0        88       104        60
OIR    2025130    131400   -8.9700 -138.1500      10.1        82       103        60
OIR    2025130    131400   -8.9700 -138.1600       8.3        81       103        60
OIR    2025130    131400   -8.9700 -138.1700       8.1        80       103        60
OIR    2025130    131400   -8.9700 -138.1800       8.0        76       103        60
OIR    2025130    131400   -8.9700 -138.1900       8.0        72       103        60
OIR    2025130    131400   -8.9700 -138.2000       8.2        68       103        60
OIR    2025130    131400   -8.9700 -138.2100       8.3        64       103        60
OIR    2025130    131400   -8.9700 -138.2200       8.5        57       103        60
OIR    2025130    131400   -8.9700 -138.2300       9.0        51       103        60
OIR    2025130    131400   -8.9700 -138.2400       9.4        48       103        60
OIR    2025130    131400   -8.9700 -138.2500       9.4        51       103        60
OIR    2025130    131400   -8.9700 -138.2600       9.0        56       103        60
OIR    2025130    131400   -8.9700 -138.2700       8.9        59       103        60
OIR    2025130    131400   -8.9700 -138.2800       8.9        61       103        60
OIR    2025130    131400   -8.9700 -138.2900       9.0        60       103        60
OIR    2025130    131400   -8.9700 -138.3000       9.3        57       103        60
OIR    2025130    131400   -8.9700 -138.3100      10.2        47       103        60
OIR    2025130    131400   -8.9700 -138.3200      12.5        32       103        60
OIR    2025130    131400   -8.9700 -138.3300      18.7        10       104        60
OIR    2025130    131400   -8.9700 -138.3400      23.1       359       104        60
OIR    2025130    131400   -8.9700 -138.3500      23.3       358       104        60
OIR    2025130    131400   -8.9700 -138.3600      23.2       357       104        60
OIR    2025130    131400   -8.9700 -138.3700      22.9       356       104        60
OIR    2025130    131400   -8.9700 -138.3800      22.8       356       103        60
OIR    2025130    131400   -8.9700 -138.3900      22.7       356       103        60
OIR    2025130    131400   -8.9700 -138.4000      22.5       356       103        60
OIR    2025130    131400   -8.9700 -138.4100      22.3       356       103        60
OIR    2025130    131400   -8.9700 -138.4200      22.2       356       103        60
OIR    2025130    131400   -8.9700 -138.4300      22.1       356       103        60
OIR    2025130    131400   -8.9700 -138.4400      22.0       356       103        60
OIR    2025130    131400   -8.9700 -138.4500      22.0       356       103        60
OIR    2025130    131400   -8.9700 -138.4600      22.0       356       103        60
OIR    2025130    131400   -8.9700 -138.4700      22.0       356       103        60
OIR    2025130    131400   -8.9700 -138.4800      22.0       357       103        60
OIR    2025130    131400   -8.9700 -138.4900      22.5       357       103        60
OIR    2025130    131400   -8.9700 -138.5000      23.5       357       103        60
OIR    2025130    131400   -8.9700 -138.5100      24.3       358       104        60
OIR    2025130    131400   -8.9700 -138.5200      24.8       358       104        60
OIR    2025130    131400   -8.9700 -138.5300      25.0       358       105        60
OIR    2025130    131400   -8.9700 -138.5400      25.0       358       107        60
OIR    2025130    131400   -8.9700 -138.5500      25.0       358       107        60
OIR    2025130    131400   -8.9700 -138.5600      25.0       358       107        60
OIR    2025130    131400   -8.9700 -138.5700      24.6       357       104        60
OIR    2025130    131400   -8.9700 -138.5800      23.7       356       104        60
OIR    2025130    131400   -8.9700 -138.5900      22.6       356       104        60
OIR    2025130    131400   -8.9700 -138.6000      21.3       355       104        60
OIR    2025130    131400   -8.9700 -138.6100      20.1       354       105        60
OIR    2025130    131400   -8.9700 -138.6200      19.5       353       104        60
OIR    2025130    131400   -8.9700 -138.6300      19.0       352       104        60
OIR    2025130    131400   -8.9700 -138.6400      18.6       351       103        60
OIR    2025130    131400   -8.9700 -138.6500      18.2       349       103        60
OIR    2025130    131400   -8.9700 -138.6600      18.0       348       104        60
OIR    2025130    131400   -8.9700 -138.6700      17.9       347       104        60
OIR    2025130    131400   -8.9700 -138.6800      17.7       346       104        60
OIR    2025130    131400   -8.9700 -138.6900      17.5       344       105        60
OIR    2025130    131400   -8.9700 -138.7000      17.4       343       105        60
OIR    2025130    131400   -8.9700 -138.7100      17.3       342       105        60
OIR    2025130    131400   -8.9700 -138.7200      17.2       341       107        60
OIR    2025130    131400   -8.9700 -138.7300      17.1       341       105        60
OIR    2025130    131400   -8.9700 -138.7400      17.1       340       104        60
OIR    2025130    131400   -8.9700 -138.7500      16.9       340       109        60
OIR    2025130    131400   -8.9700 -138.7600      16.6       339       112        60
OIR    2025130    131400   -8.9700 -138.7700      16.0       338       112        60
OIR    2025130    131400   -8.9700 -138.7800      15.5       337       113        60
OIR    2025130    131400   -8.9700 -138.7900      15.0       336       117        60
OIR    2025130    131400   -8.9700 -138.8000      14.6       335       121        60
OIR    2025130    131400   -8.9700 -138.8100      14.2       334       122        60
OIR    2025130    131400   -8.9700 -138.8200      13.8       333       124        60
OIR    2025130    131400   -8.9700 -138.8300      13.2       331       125        60
OIR    2025130    131400   -8.9700 -138.8400      12.8       329       129        60
OIR    2025130    131400   -8.9700 -138.8500      12.6       327       132        60
OIR    2025130    131400   -8.9700 -138.8600      12.4       326       132        60
OIR    2025130    131400   -8.9700 -138.8700      12.4       324       132        60
OIR    2025130    131400   -8.9700 -138.8800      12.3       323       133        60
OIR    2025130    131400   -8.9700 -138.8900      12.2       321       133        60
OIR    2025130    131400   -8.9700 -138.9000      12.1       313       132        60
OIR    2025130    131400   -8.9700 -138.9100      13.7       294       142        60
OIR    2025130    131400   -8.9800 -136.3700      35.2       103       143        60
OIR    2025130    131400   -8.9800 -136.3800      35.5       104       141        60
OIR    2025130    131400   -8.9800 -136.3900      35.7       105       142        60
OIR    2025130    131400   -8.9800 -136.4700      34.8       108       141        60
OIR    2025130    131400   -8.9800 -136.4800      35.1       108       138        60
OIR    2025130    131400   -8.9800 -136.4900      35.2       108       135        60
OIR    2025130    131400   -8.9800 -136.5000      35.2       108       133        60
OIR    2025130    131400   -8.9800 -136.5100      35.1       108       130        60
OIR    2025130    131400   -8.9800 -136.5200      34.9       109       129        60
OIR    2025130    131400   -8.9800 -136.5300      34.7       109       128        60
OIR    2025130    131400   -8.9800 -136.5400      34.5       108       126        60
OIR    2025130    131400   -8.9800 -136.5500      34.2       108       125        60
OIR    2025130    131400   -8.9800 -136.5600      33.8       108       125        60
OIR    2025130    131400   -8.9800 -136.5700      33.6       108       126        60
OIR    2025130    131400   -8.9800 -136.5800      33.4       108       127        60
OIR    2025130    131400   -8.9800 -136.5900      33.0       108       128        60
OIR    2025130    131400   -8.9800 -136.6000      32.8       108       127        60
OIR    2025130    131400   -8.9800 -136.6100      32.6       108       129        60
OIR    2025130    131400   -8.9800 -136.6200      32.2       108       132        60
OIR    2025130    131400   -8.9800 -136.6300      31.5       108       137        60
OIR    2025130    131400   -8.9800 -136.6400      29.1       109       142        60
OIR    2025130    131400   -8.9800 -136.6500      26.5       111       142        60
OIR    2025130    131400   -8.9800 -136.6600      26.2       111       141        60
OIR    2025130    131400   -8.9800 -136.6700      26.1       111       140        60
OIR    2025130    131400   -8.9800 -136.6800      26.1       111       139        60
OIR    2025130    131400   -8.9800 -136.6900      26.1       111       136        60
OIR    2025130    131400   -8.9800 -136.7000      26.1       111       134        60
OIR    2025130    131400   -8.9800 -136.7100      26.1       111       131        60
OIR    2025130    131400   -8.9800 -136.7200      26.1       111       130        60
OIR    2025130    131400   -8.9800 -136.7300      26.1       111       129        60
OIR    2025130    131400   -8.9800 -136.7400      26.1       111       131        60
OIR    2025130    131400   -8.9800 -136.7500      26.1       111       133        60
OIR    2025130    131400   -8.9800 -136.7600      26.1       111       135        60
OIR    2025130    131400   -8.9800 -136.7700      26.0       111       136        60
OIR    2025130    131400   -8.9800 -136.7800      25.9       111       138        60
OIR    2025130    131400   -8.9800 -136.7900      25.4       111       138        60
OIR    2025130    131400   -8.9800 -136.8000      24.3       111       137        60
OIR    2025130    131400   -8.9800 -136.8100      22.5       110       136        60
OIR    2025130    131400   -8.9800 -136.8200      20.5       111       135        60
OIR    2025130    131400   -8.9800 -136.8300      18.5       112       136        60
OIR    2025130    131400   -8.9800 -136.8400      17.3       113       138        60
OIR    2025130    131400   -8.9800 -136.8500      16.7       114       138        60
OIR    2025130    131400   -8.9800 -136.8600      16.3       115       139        60
OIR    2025130    131400   -8.9800 -136.8700      15.9       115       136        60
OIR    2025130    131400   -8.9800 -136.8800      15.7       115       134        60
OIR    2025130    131400   -8.9800 -136.8900      15.6       115       134        60
OIR    2025130    131400   -8.9800 -136.9000      15.4       114       134        60
OIR    2025130    131400   -8.9800 -136.9100      15.3       114       134        60
OIR    2025130    131400   -8.9800 -136.9200      15.2       114       133        60
OIR    2025130    131400   -8.9800 -136.9300      15.1       113       132        60
OIR    2025130    131400   -8.9800 -136.9400      15.1       111       130        60
OIR    2025130    131400   -8.9800 -136.9500      15.1       110       128        60
OIR    2025130    131400   -8.9800 -136.9600      15.1       110       127        60
OIR    2025130    131400   -8.9800 -136.9700      15.2       110       127        60
OIR    2025130    131400   -8.9800 -136.9800      15.3       111       125        60
OIR    2025130    131400   -8.9800 -136.9900      15.4       112       123        60
OIR    2025130    131400   -8.9800 -137.0000      15.5       112       122        60
OIR    2025130    131400   -8.9800 -137.0100      15.7       113       120        60
OIR    2025130    131400   -8.9800 -137.0200      15.8       112       116        60
OIR    2025130    131400   -8.9800 -137.0300      15.8       112       116        60
OIR    2025130    131400   -8.9800 -137.0400      15.8       113       116        60
OIR    2025130    131400   -8.9800 -137.0500      15.8       113       116        60
OIR    2025130    131400   -8.9800 -137.0600      15.7       114       119        60
OIR    2025130    131400   -8.9800 -137.0700      15.5       115       120        60
OIR    2025130    131400   -8.9800 -137.0800      15.1       118       121        60
OIR    2025130    131400   -8.9800 -137.0900      15.1       118       120        60
OIR    2025130    131400   -8.9800 -137.1000      15.2       118       119        60
OIR    2025130    131400   -8.9800 -137.1100      15.2       118       116        60
OIR    2025130    131400   -8.9800 -137.1200      15.4       118       115        60
OIR    2025130    131400   -8.9800 -137.1300      15.7       117       115        60
OIR    2025130    131400   -8.9800 -137.1400      16.0       115       116        60
OIR    2025130    131400   -8.9800 -137.1500      16.1       115       117        60
OIR    2025130    131400   -8.9800 -137.1600      16.1       115       119        60
OIR    2025130    131400   -8.9800 -137.1700      15.9       116       120        60
OIR    2025130    131400   -8.9800 -137.1800      15.7       116       119        60
OIR    2025130    131400   -8.9800 -137.1900      15.6       117       117        60
OIR    2025130    131400   -8.9800 -137.2000      15.5       118       116        60
OIR    2025130    131400   -8.9800 -137.2100      15.5       118       116        60
OIR    2025130    131400   -8.9800 -137.2200      15.4       119       117        60
OIR    2025130    131400   -8.9800 -137.2300      15.4       119       119        60
OIR    2025130    131400   -8.9800 -137.2400      15.3       119       120        60
OIR    2025130    131400   -8.9800 -137.2500      15.2       119       119        60
OIR    2025130    131400   -8.9800 -137.2600      15.2       120       116        60
OIR    2025130    131400   -8.9800 -137.2700      15.2       120       115        60
OIR    2025130    131400   -8.9800 -137.2800      15.3       121       114        60
OIR    2025130    131400   -8.9800 -137.2900      15.3       121       116        60
OIR    2025130    131400   -8.9800 -137.3000      15.3       121       116        60
OIR    2025130    131400   -8.9800 -137.3100      15.3       121       117        60
OIR    2025130    131400   -8.9800 -137.3200      15.4       122       117        60
OIR    2025130    131400   -8.9800 -137.3300      15.7       122       119        60
OIR    2025130    131400   -8.9800 -137.3400      16.2       124       121        60
OIR    2025130    131400   -8.9800 -137.3500      16.7       125       123        60
OIR    2025130    131400   -8.9800 -137.3600      17.4       126       126        60
OIR    2025130    131400   -8.9800 -137.3700      17.7       126       128        60
OIR    2025130    131400   -8.9800 -137.3800      17.8       126       132        60
OIR    2025130    131400   -8.9800 -137.3900      17.6       125       136        60
OIR    2025130    131400   -8.9800 -137.4000      16.2       121       142        60
OIR    2025130    131400   -8.9800 -137.4100      15.6       118       145        60
OIR    2025130    131400   -8.9800 -137.4200      15.5       117       145        60
OIR    2025130    131400   -8.9800 -137.4300      15.3       114       147        60
OIR    2025130    131400   -8.9800 -137.5100      12.4       120       142        60
OIR    2025130    131400   -8.9800 -137.5200      11.0       124       132        60
OIR    2025130    131400   -8.9800 -137.5300      12.2       130       123        60
OIR    2025130    131400   -8.9800 -137.5400      13.9       126       115        60
OIR    2025130    131400   -8.9800 -137.5500      15.7       119       112        60
OIR    2025130    131400   -8.9800 -137.5600      16.2       114       109        60
OIR    2025130    131400   -8.9800 -137.5700      16.0       108       105        60
OIR    2025130    131400   -8.9800 -137.5800      15.2       107       107        60
OIR    2025130    131400   -8.9800 -137.5900      13.2       110       107        60
OIR    2025130    131400   -8.9800 -137.6000       8.7       123       108        60
OIR    2025130    131400   -8.9800 -137.6100       6.4       167       110        60
OIR    2025130    131400   -8.9800 -137.6200       9.0       194       114        60
OIR    2025130    131400   -8.9800 -137.6300      11.2       197       121        60
OIR    2025130    131400   -8.9800 -137.6400      12.5       196       131        60
OIR    2025130    131400   -8.9800 -137.6500      12.1       194       136        60
OIR    2025130    131400   -8.9800 -137.6600      10.7       194       132        60
OIR    2025130    131400   -8.9800 -137.6700      16.7       185       129        60
OIR    2025130    131400   -8.9800 -137.6800      24.3       184       128        60
OIR    2025130    131400   -8.9800 -137.6900      23.2       189       126        60
OIR    2025130    131400   -8.9800 -137.7000      19.0       176       124        60
OIR    2025130    131400   -8.9800 -137.7100      19.2       162       123        60
OIR    2025130    131400   -8.9800 -137.7200      22.7       160       123        60
OIR    2025130    131400   -8.9800 -137.7300      24.8       166       126        60
OIR    2025130    131400   -8.9800 -137.7400      22.9       171       128        60
OIR    2025130    131400   -8.9800 -137.7500      21.3       194       129        60
OIR    2025130    131400   -8.9800 -137.7600      19.1       209       128        60
OIR    2025130    131400   -8.9800 -137.7700      18.5       230       124        60
OIR    2025130    131400   -8.9800 -137.7800      20.7       287       122        60
OIR    2025130    131400   -8.9800 -137.7900      23.9       304       122        60
OIR    2025130    131400   -8.9800 -137.8000      20.4       323       130        60
OIR    2025130    131400   -8.9800 -137.8100       4.4        57       139        60
OIR    2025130    131400   -8.9800 -137.8600       5.6       187       143        60
OIR    2025130    131400   -8.9800 -137.8700       5.4       186       135        60
OIR    2025130    131400   -8.9800 -137.8800       4.7       163       137        60
OIR    2025130    131400   -8.9800 -137.8900       4.8       149       142        60
OIR    2025130    131400   -8.9800 -137.9000       4.8       148       146        60
OIR    2025130    131400   -8.9800 -137.9100       4.9       150       145        60
OIR    2025130    131400   -8.9800 -137.9200       5.1       158       144        60
OIR    2025130    131400   -8.9800 -138.1100      13.8       102       138        60
OIR    2025130    131400   -8.9800 -138.1200      15.5        95       120        60
OIR    2025130    131400   -8.9800 -138.1300      15.2        93       109        60
OIR    2025130    131400   -8.9800 -138.1400      10.8        86       103        60
OIR    2025130    131400   -8.9800 -138.1500       8.7        79       103        60
OIR    2025130    131400   -8.9800 -138.1600       7.9        75       103        60
OIR    2025130    131400   -8.9800 -138.1700       7.9        71       103        60
OIR    2025130    131400   -8.9800 -138.1800       8.1        63       103        60
OIR    2025130    131400   -8.9800 -138.1900       8.5        55       103        60
OIR    2025130    131400   -8.9800 -138.2000       9.1        49       103        60
OIR    2025130    131400   -8.9800 -138.2100       9.9        42       103        60
OIR    2025130    131400   -8.9800 -138.2200      10.6        37       103        60
OIR    2025130    131400   -8.9800 -138.2300      11.1        35       103        60
OIR    2025130    131400   -8.9800 -138.2400      11.3        35       103        60
OIR    2025130    131400   -8.9800 -138.2500      11.2        37       103        60
OIR    2025130    131400   -8.9800 -138.2600      10.6        40       103        60
OIR    2025130    131400   -8.9800 -138.2700      10.0        46       103        60
OIR    2025130    131400   -8.9800 -138.2800       9.6        51       103        60
OIR    2025130    131400   -8.9800 -138.2900       9.6        51       103        60
OIR    2025130    131400   -8.9800 -138.3000      10.5        45       103        60
OIR    2025130    131400   -8.9800 -138.3100      11.9        35       103        60
OIR    2025130    131400   -8.9800 -138.3200      14.9        22       103        60
OIR    2025130    131400   -8.9800 -138.3300      20.9         6       103        60
OIR    2025130    131400   -8.9800 -138.3400      23.1         1       103        60
OIR    2025130    131400   -8.9800 -138.3500      23.5       358       104        60
OIR    2025130    131400   -8.9800 -138.3600      23.5       357       103        60
OIR    2025130    131400   -8.9800 -138.3700      23.3       357       103        60
OIR    2025130    131400   -8.9800 -138.3800      23.3       356       103        60
OIR    2025130    131400   -8.9800 -138.3900      23.2       356       103        60
OIR    2025130    131400   -8.9800 -138.4000      23.1       356       103        60
OIR    2025130    131400   -8.9800 -138.4100      22.9       356       103        60
OIR    2025130    131400   -8.9800 -138.4200      22.6       356       103        60
OIR    2025130    131400   -8.9800 -138.4300      22.4       356       103        60
OIR    2025130    131400   -8.9800 -138.4400      22.2       356       103        60
OIR    2025130    131400   -8.9800 -138.4500      22.0       356       103        60
OIR    2025130    131400   -8.9800 -138.4600      22.0       356       103        60
OIR    2025130    131400   -8.9800 -138.4700      22.1       356       103        60
OIR    2025130    131400   -8.9800 -138.4800      22.3       357       103        60
OIR    2025130    131400   -8.9800 -138.4900      23.2       357       103        60
OIR    2025130    131400   -8.9800 -138.5000      24.0       358       103        60
OIR    2025130    131400   -8.9800 -138.5100      24.6       358       103        60
OIR    2025130    131400   -8.9800 -138.5200      24.9       358       103        60
OIR    2025130    131400   -8.9800 -138.5300      25.1       358       104        60
OIR    2025130    131400   -8.9800 -138.5400      25.1       358       104        60
OIR    2025130    131400   -8.9800 -138.5500      25.2       358       104        60
OIR    2025130    131400   -8.9800 -138.5600      25.1       358       104        60
OIR    2025130    131400   -8.9800 -138.5700      25.0       357       104        60
OIR    2025130    131400   -8.9800 -138.5800      24.7       357       103        60
OIR    2025130    131400   -8.9800 -138.5900      23.9       356       104        60
OIR    2025130    131400   -8.9800 -138.6000      22.7       356       104        60
OIR    2025130    131400   -8.9800 -138.6100      21.5       355       104        60
OIR    2025130    131400   -8.9800 -138.6200      20.6       354       104        60
OIR    2025130    131400   -8.9800 -138.6300      20.0       353       103        60
OIR    2025130    131400   -8.9800 -138.6400      19.4       351       103        60
OIR    2025130    131400   -8.9800 -138.6500      18.9       350       103        60
OIR    2025130    131400   -8.9800 -138.6600      18.5       348       103        60
OIR    2025130    131400   -8.9800 -138.6700      18.3       347       103        60
OIR    2025130    131400   -8.9800 -138.6800      18.0       346       104        60
OIR    2025130    131400   -8.9800 -138.6900      17.8       344       104        60
OIR    2025130    131400   -8.9800 -138.7000      17.6       343       104        60
OIR    2025130    131400   -8.9800 -138.7100      17.5       342       104        60
OIR    2025130    131400   -8.9800 -138.7200      17.4       341       104        60
OIR    2025130    131400   -8.9800 -138.7300      17.3       341       104        60
OIR    2025130    131400   -8.9800 -138.7400      17.2       340       107        60
OIR    2025130    131400   -8.9800 -138.7500      17.1       340       107        60
OIR    2025130    131400   -8.9800 -138.7600      16.9       340       107        60
OIR    2025130    131400   -8.9800 -138.7700      16.4       339       108        60
OIR    2025130    131400   -8.9800 -138.7800      15.8       338       111        60
OIR    2025130    131400   -8.9800 -138.7900      15.3       337       116        60
OIR    2025130    131400   -8.9800 -138.8000      14.8       336       119        60
OIR    2025130    131400   -8.9800 -138.8100      14.4       335       117        60
OIR    2025130    131400   -8.9800 -138.8200      14.1       334       119        60
OIR    2025130    131400   -8.9800 -138.8300      13.6       333       121        60
OIR    2025130    131400   -8.9800 -138.8400      13.2       330       123        60
OIR    2025130    131400   -8.9800 -138.8500      12.9       328       126        60
OIR    2025130    131400   -8.9800 -138.8600      12.7       326       126        60
OIR    2025130    131400   -8.9800 -138.8700      12.6       325       127        60
OIR    2025130    131400   -8.9800 -138.8800      12.5       323       130        60
OIR    2025130    131400   -8.9800 -138.8900      12.4       321       132        60
OIR    2025130    131400   -8.9800 -138.9000      13.2       304       128        60
OIR    2025130    131400   -8.9800 -138.9100      14.2       291       134        60
OIR    2025130    131400   -8.9900 -136.2900      33.5       101       144        60
OIR    2025130    131400   -8.9900 -136.3400      34.8       102       143        60
OIR    2025130    131400   -8.9900 -136.3500      35.1       102       142        60
OIR    2025130    131400   -8.9900 -136.3600      35.3       103       140        60
OIR    2025130    131400   -8.9900 -136.3700      35.8       104       139        60
OIR    2025130    131400   -8.9900 -136.3800      36.2       105       137        60
OIR    2025130    131400   -8.9900 -136.3900      36.4       105       138        60
OIR    2025130    131400   -8.9900 -136.4000      36.4       106       139        60
OIR    2025130    131400   -8.9900 -136.4100      36.4       106       140        60
OIR    2025130    131400   -8.9900 -136.4200      36.3       106       141        60
OIR    2025130    131400   -8.9900 -136.4300      36.0       107       141        60
OIR    2025130    131400   -8.9900 -136.4400      35.6       107       141        60
OIR    2025130    131400   -8.9900 -136.4500      35.3       108       141        60
OIR    2025130    131400   -8.9900 -136.4600      35.3       108       140        60
OIR    2025130    131400   -8.9900 -136.4700      35.5       108       138        60
OIR    2025130    131400   -8.9900 -136.4800      35.7       108       135        60
OIR    2025130    131400   -8.9900 -136.4900      35.7       108       133        60
OIR    2025130    131400   -8.9900 -136.5000      35.7       108       131        60
OIR    2025130    131400   -8.9900 -136.5100      35.6       109       128        60
OIR    2025130    131400   -8.9900 -136.5200      35.3       109       127        60
OIR    2025130    131400   -8.9900 -136.5300      35.2       109       126        60
OIR    2025130    131400   -8.9900 -136.5400      34.9       109       125        60
OIR    2025130    131400   -8.9900 -136.5500      34.7       108       124        60
OIR    2025130    131400   -8.9900 -136.5600      34.3       108       124        60
OIR    2025130    131400   -8.9900 -136.5700      33.9       108       125        60
OIR    2025130    131400   -8.9900 -136.5800      33.7       108       126        60
OIR    2025130    131400   -8.9900 -136.5900      33.2       108       126        60
OIR    2025130    131400   -8.9900 -136.6000      32.9       108       126        60
OIR    2025130    131400   -8.9900 -136.6100      32.7       107       128        60
OIR    2025130    131400   -8.9900 -136.6200      32.4       107       131        60
OIR    2025130    131400   -8.9900 -136.6300      31.8       107       135        60
OIR    2025130    131400   -8.9900 -136.6400      29.8       108       140        60
OIR    2025130    131400   -8.9900 -136.6500      27.0       110       139        60
OIR    2025130    131400   -8.9900 -136.6600      26.5       111       137        60
OIR    2025130    131400   -8.9900 -136.6700      26.3       111       138        60
OIR    2025130    131400   -8.9900 -136.6800      26.2       111       137        60
OIR    2025130    131400   -8.9900 -136.6900      26.2       111       135        60
OIR    2025130    131400   -8.9900 -136.7000      26.2       111       132        60
OIR    2025130    131400   -8.9900 -136.7100      26.2       111       129        60
OIR    2025130    131400   -8.9900 -136.7200      26.3       111       128        60
OIR    2025130    131400   -8.9900 -136.7300      26.4       111       128        60
OIR    2025130    131400   -8.9900 -136.7400      26.3       111       131        60
OIR    2025130    131400   -8.9900 -136.7500      26.2       111       134        60
OIR    2025130    131400   -8.9900 -136.7600      26.2       110       135        60
OIR    2025130    131400   -8.9900 -136.7700      26.1       110       136        60
OIR    2025130    131400   -8.9900 -136.7800      26.0       110       136        60
OIR    2025130    131400   -8.9900 -136.7900      25.3       109       135        60
OIR    2025130    131400   -8.9900 -136.8000      24.0       108       133        60
OIR    2025130    131400   -8.9900 -136.8100      22.3       108       132        60
OIR    2025130    131400   -8.9900 -136.8200      20.5       108       132        60
OIR    2025130    131400   -8.9900 -136.8300      18.9       110       133        60
OIR    2025130    131400   -8.9900 -136.8400      17.7       111       134        60
OIR    2025130    131400   -8.9900 -136.8500      16.9       112       137        60
OIR    2025130    131400   -8.9900 -136.8600      16.4       113       139        60
OIR    2025130    131400   -8.9900 -136.8700      16.0       114       136        60
OIR    2025130    131400   -8.9900 -136.8800      15.7       114       134        60
OIR    2025130    131400   -8.9900 -136.8900      15.6       113       133        60
OIR    2025130    131400   -8.9900 -136.9000      15.4       113       133        60
OIR    2025130    131400   -8.9900 -136.9100      15.3       112       132        60
OIR    2025130    131400   -8.9900 -136.9200      15.2       111       132        60
OIR    2025130    131400   -8.9900 -136.9300      15.2       110       130        60
OIR    2025130    131400   -8.9900 -136.9400      15.2       109       128        60
OIR    2025130    131400   -8.9900 -136.9500      15.2       108       126        60
OIR    2025130    131400   -8.9900 -136.9600      15.3       108       125        60
OIR    2025130    131400   -8.9900 -136.9700      15.4       108       125        60
OIR    2025130    131400   -8.9900 -136.9800      15.5       108       123        60
OIR    2025130    131400   -8.9900 -136.9900      15.7       108       121        60
OIR    2025130    131400   -8.9900 -137.0000      15.8       108       120        60
OIR    2025130    131400   -8.9900 -137.0100      16.0       108       117        60
OIR    2025130    131400   -8.9900 -137.0200      16.1       108       115        60
OIR    2025130    131400   -8.9900 -137.0300      16.3       108       114        60
OIR    2025130    131400   -8.9900 -137.0400      16.4       108       114        60
OIR    2025130    131400   -8.9900 -137.0500      16.4       108       116        60
OIR    2025130    131400   -8.9900 -137.0600      16.4       109       117        60
OIR    2025130    131400   -8.9900 -137.0700      16.2       110       119        60
OIR    2025130    131400   -8.9900 -137.0800      15.6       113       120        60
OIR    2025130    131400   -8.9900 -137.0900      15.4       115       119        60
OIR    2025130    131400   -8.9900 -137.1000      15.5       115       117        60
OIR    2025130    131400   -8.9900 -137.1100      15.5       116       115        60
OIR    2025130    131400   -8.9900 -137.1200      15.8       115       114        60
OIR    2025130    131400   -8.9900 -137.1300      16.3       113       113        60
OIR    2025130    131400   -8.9900 -137.1400      16.7       111       114        60
OIR    2025130    131400   -8.9900 -137.1500      17.0       110       116        60
OIR    2025130    131400   -8.9900 -137.1600      16.9       110       117        60
OIR    2025130    131400   -8.9900 -137.1700      16.6       112       119        60
OIR    2025130    131400   -8.9900 -137.1800      16.2       113       117        60
OIR    2025130    131400   -8.9900 -137.1900      15.9       114       116        60
OIR    2025130    131400   -8.9900 -137.2000      15.7       115       116        60
OIR    2025130    131400   -8.9900 -137.2100      15.6       116       116        60
OIR    2025130    131400   -8.9900 -137.2200      15.5       117       116        60
OIR    2025130    131400   -8.9900 -137.2300      15.4       118       117        60
OIR    2025130    131400   -8.9900 -137.2400      15.3       118       117        60
OIR    2025130    131400   -8.9900 -137.2500      15.2       119       116        60
OIR    2025130    131400   -8.9900 -137.2600      15.2       119       115        60
OIR    2025130    131400   -8.9900 -137.2700      15.2       120       114        60
OIR    2025130    131400   -8.9900 -137.2800      15.3       120       113        60
OIR    2025130    131400   -8.9900 -137.2900      15.3       121       116        60
OIR    2025130    131400   -8.9900 -137.3000      15.4       121       116        60
OIR    2025130    131400   -8.9900 -137.3100      15.4       121       116        60
OIR    2025130    131400   -8.9900 -137.3200      15.6       122       116        60
OIR    2025130    131400   -8.9900 -137.3300      16.3       123       117        60
OIR    2025130    131400   -8.9900 -137.3400      17.1       126       121        60
OIR    2025130    131400   -8.9900 -137.3500      17.6       126       123        60
OIR    2025130    131400   -8.9900 -137.3600      17.8       126       126        60
OIR    2025130    131400   -8.9900 -137.3700      17.8       127       129        60
OIR    2025130    131400   -8.9900 -137.3800      17.8       127       132        60
OIR    2025130    131400   -8.9900 -137.3900      17.8       127       136        60
OIR    2025130    131400   -8.9900 -137.4000      17.8       126       141        60
OIR    2025130    131400   -8.9900 -137.4100      17.6       125       142        60
OIR    2025130    131400   -8.9900 -137.4200      17.2       123       141        60
OIR    2025130    131400   -8.9900 -137.4300      16.6       120       142        60
OIR    2025130    131400   -8.9900 -137.4400      16.1       116       144        60
OIR    2025130    131400   -8.9900 -137.4500      15.9       114       148        60
OIR    2025130    131400   -8.9900 -137.5000      18.0       110       145        60
OIR    2025130    131400   -8.9900 -137.5100      16.4       109       132        60
OIR    2025130    131400   -8.9900 -137.5200      13.0       106       122        60
OIR    2025130    131400   -8.9900 -137.5300      12.1       110       114        60
OIR    2025130    131400   -8.9900 -137.5400      13.8       113       108        60
OIR    2025130    131400   -8.9900 -137.5500      15.1       109       105        60
OIR    2025130    131400   -8.9900 -137.5600      15.9       101       104        60
OIR    2025130    131400   -8.9900 -137.5700      16.1        95       103        60
OIR    2025130    131400   -8.9900 -137.5800      15.9        92       103        60
OIR    2025130    131400   -8.9900 -137.5900      15.0        93       103        60
OIR    2025130    131400   -8.9900 -137.6000      12.5        97       103        60
OIR    2025130    131400   -8.9900 -137.6100       7.0       121       104        60
OIR    2025130    131400   -8.9900 -137.6200       5.6       158       107        60
OIR    2025130    131400   -8.9900 -137.6300       8.5       196       112        60
OIR    2025130    131400   -8.9900 -137.6400      12.1       198       119        60
OIR    2025130    131400   -8.9900 -137.6500      13.5       194       120        60
OIR    2025130    131400   -8.9900 -137.6600      13.7       189       114        60
OIR    2025130    131400   -8.9900 -137.6700      14.4       182       112        60
OIR    2025130    131400   -8.9900 -137.6800      11.5       184       113        60
OIR    2025130    131400   -8.9900 -137.7100       4.9       112       111        60
OIR    2025130    131400   -8.9900 -137.7200      12.8       134       109        60
OIR    2025130    131400   -8.9900 -137.7300      18.0       153       110        60
OIR    2025130    131400   -8.9900 -137.7400      17.5       171       113        60
OIR    2025130    131400   -8.9900 -137.7500      17.3       184       116        60
OIR    2025130    131400   -8.9900 -137.7600      15.0       194       117        60
OIR    2025130    131400   -8.9900 -137.7700      13.4       205       116        60
OIR    2025130    131400   -8.9900 -137.7800       9.8       214       116        60
OIR    2025130    131400   -8.9900 -137.7900       6.7       211       116        60
OIR    2025130    131400   -8.9900 -137.8000       4.9       177       124        60
OIR    2025130    131400   -8.9900 -137.8100       6.6       140       131        60
OIR    2025130    131400   -8.9900 -137.8600       4.9       193       142        60
OIR    2025130    131400   -8.9900 -137.8700       5.0       182       133        60
OIR    2025130    131400   -8.9900 -137.8800       5.0       164       133        60
OIR    2025130    131400   -8.9900 -137.8900       5.1       151       136        60
OIR    2025130    131400   -8.9900 -137.9000       5.2       147       140        60
OIR    2025130    131400   -8.9900 -137.9100       5.3       147       140        60
OIR    2025130    131400   -8.9900 -137.9200       5.1       151       140        60
OIR    2025130    131400   -8.9900 -138.1100      15.7        95       142        60
OIR    2025130    131400   -8.9900 -138.1200      15.4        95       122        60
OIR    2025130    131400   -8.9900 -138.1300      14.1        95       112        60
OIR    2025130    131400   -8.9900 -138.1400       7.8        85       105        60
OIR    2025130    131400   -8.9900 -138.1500       6.2        74       104        60
OIR    2025130    131400   -8.9900 -138.1600       6.8        65       103        60
OIR    2025130    131400   -8.9900 -138.1700       8.1        53       103        60
OIR    2025130    131400   -8.9900 -138.1800       9.3        44       104        60
OIR    2025130    131400   -8.9900 -138.1900      10.1        40       104        60
OIR    2025130    131400   -8.9900 -138.2000      10.6        38       104        60
OIR    2025130    131400   -8.9900 -138.2100      11.4        35       103        60
OIR    2025130    131400   -8.9900 -138.2200      12.0        33       103        60
OIR    2025130    131400   -8.9900 -138.2300      12.1        32       103        60
OIR    2025130    131400   -8.9900 -138.2400      12.2        32       103        60
OIR    2025130    131400   -8.9900 -138.2500      12.5        31       103        60
OIR    2025130    131400   -8.9900 -138.2600      12.7        31       103        60
OIR    2025130    131400   -8.9900 -138.2700      12.9        30       103        60
OIR    2025130    131400   -8.9900 -138.2800      13.6        27       103        60
OIR    2025130    131400   -8.9900 -138.2900      14.4        25       103        60
OIR    2025130    131400   -8.9900 -138.3000      14.8        25       103        60
OIR    2025130    131400   -8.9900 -138.3100      16.0        21       103        60
OIR    2025130    131400   -8.9900 -138.3200      18.1        15       103        60
OIR    2025130    131400   -8.9900 -138.3300      21.1         7       103        60
OIR    2025130    131400   -8.9900 -138.3400      23.0         2       103        60
OIR    2025130    131400   -8.9900 -138.3500      23.7       358       103        60
OIR    2025130    131400   -8.9900 -138.3600      23.7       357       103        60
OIR    2025130    131400   -8.9900 -138.3700      23.7       357       103        60
OIR    2025130    131400   -8.9900 -138.3800      23.7       357       103        60
OIR    2025130    131400   -8.9900 -138.3900      23.8       357       103        60
OIR    2025130    131400   -8.9900 -138.4000      23.7       357       103        60
OIR    2025130    131400   -8.9900 -138.4100      23.7       357       103        60
OIR    2025130    131400   -8.9900 -138.4200      23.5       356       103        60
OIR    2025130    131400   -8.9900 -138.4300      23.2       356       103        60
OIR    2025130    131400   -8.9900 -138.4400      22.8       356       103        60
OIR    2025130    131400   -8.9900 -138.4500      22.6       356       103        60
OIR    2025130    131400   -8.9900 -138.4600      22.5       356       103        60
OIR    2025130    131400   -8.9900 -138.4700      22.8       357       103        60
OIR    2025130    131400   -8.9900 -138.4800      23.3       357       103        60
OIR    2025130    131400   -8.9900 -138.4900      24.1       357       103        60
OIR    2025130    131400   -8.9900 -138.5000      24.7       358       103        60
OIR    2025130    131400   -8.9900 -138.5100      25.1       358       103        60
OIR    2025130    131400   -8.9900 -138.5200      25.2       358       103        60
OIR    2025130    131400   -8.9900 -138.5300      25.3       358       103        60
OIR    2025130    131400   -8.9900 -138.5400      25.3       358       104        60
OIR    2025130    131400   -8.9900 -138.5500      25.2       358       103        60
OIR    2025130    131400   -8.9900 -138.5600      25.2       358       103        60
OIR    2025130    131400   -8.9900 -138.5700      25.1       357       103        60
OIR    2025130    131400   -8.9900 -138.5800      25.0       357       103        60
OIR    2025130    131400   -8.9900 -138.5900      24.6       357       103        60
OIR    2025130    131400   -8.9900 -138.6000      24.0       356       103        60
OIR    2025130    131400   -8.9900 -138.6100      23.1       355       103        60
OIR    2025130    131400   -8.9900 -138.6200      22.1       354       103        60
OIR    2025130    131400   -8.9900 -138.6300      21.3       353       103        60
OIR    2025130    131400   -8.9900 -138.6400      20.6       352       103        60
OIR    2025130    131400   -8.9900 -138.6500      19.9       351       103        60
OIR    2025130    131400   -8.9900 -138.6600      19.2       349       103        60
OIR    2025130    131400   -8.9900 -138.6700      18.8       348       104        60
OIR    2025130    131400   -8.9900 -138.6800      18.4       347       103        60
OIR    2025130    131400   -8.9900 -138.6900      18.0       345       103        60
OIR    2025130    131400   -8.9900 -138.7000      17.8       343       103        60
OIR    2025130    131400   -8.9900 -138.7100      17.6       342       104        60
OIR    2025130    131400   -8.9900 -138.7200      17.4       341       104        60
OIR    2025130    131400   -8.9900 -138.7300      17.3       341       105        60
OIR    2025130    131400   -8.9900 -138.7400      17.2       340       109        60
OIR    2025130    131400   -8.9900 -138.7500      17.1       340       107        60
OIR    2025130    131400   -8.9900 -138.7600      17.0       340       107        60
OIR    2025130    131400   -8.9900 -138.7700      16.7       340       109        60
OIR    2025130    131400   -8.9900 -138.7800      16.2       339       112        60
OIR    2025130    131400   -8.9900 -138.7900      15.6       338       116        60
OIR    2025130    131400   -8.9900 -138.8000      15.1       337       117        60
OIR    2025130    131400   -8.9900 -138.8100      14.7       336       117        60
OIR    2025130    131400   -8.9900 -138.8200      14.3       335       119        60
OIR    2025130    131400   -8.9900 -138.8300      13.9       333       120        60
OIR    2025130    131400   -8.9900 -138.8400      13.6       331       123        60
OIR    2025130    131400   -8.9900 -138.8500      13.4       329       125        60
OIR    2025130    131400   -8.9900 -138.8600      13.2       327       126        60
OIR    2025130    131400   -8.9900 -138.8700      13.0       325       127        60
OIR    2025130    131400   -8.9900 -138.8800      12.9       324       129        60
OIR    2025130    131400   -8.9900 -138.8900      12.8       321       131        60
OIR    2025130    131400   -8.9900 -138.9000      13.4       304       128        60
OIR    2025130    131400   -8.9900 -138.9100      14.2       292       131        60
OIR    2025130    131400   -8.9900 -138.9200      14.0       292       139        60
OIR    2025130    131400   -9.0000 -136.3400      35.2       102       143        60
OIR    2025130    131400   -9.0000 -136.3500      35.5       103       142        60
OIR    2025130    131400   -9.0000 -136.3600      35.9       103       142        60
OIR    2025130    131400   -9.0000 -136.3700      36.5       104       141        60
OIR    2025130    131400   -9.0000 -136.3800      36.7       105       140        60
OIR    2025130    131400   -9.0000 -136.3900      36.8       105       143        60
OIR    2025130    131400   -9.0000 -136.4300      36.5       107       143        60
OIR    2025130    131400   -9.0000 -136.4400      36.3       108       141        60
OIR    2025130    131400   -9.0000 -136.4500      36.1       108       140        60
OIR    2025130    131400   -9.0000 -136.4600      36.0       108       138        60
OIR    2025130    131400   -9.0000 -136.4700      36.1       108       137        60
OIR    2025130    131400   -9.0000 -136.4800      36.1       108       135        60
OIR    2025130    131400   -9.0000 -136.4900      36.1       108       133        60
OIR    2025130    131400   -9.0000 -136.5000      36.1       108       130        60
OIR    2025130    131400   -9.0000 -136.5100      35.9       108       128        60
OIR    2025130    131400   -9.0000 -136.5200      35.7       109       128        60
OIR    2025130    131400   -9.0000 -136.5300      35.6       109       128        60
OIR    2025130    131400   -9.0000 -136.5400      35.5       109       127        60
OIR    2025130    131400   -9.0000 -136.5500      35.3       109       126        60
OIR    2025130    131400   -9.0000 -136.5600      34.9       109       127        60
OIR    2025130    131400   -9.0000 -136.5700      34.5       109       127        60
OIR    2025130    131400   -9.0000 -136.5800      34.1       108       127        60
OIR    2025130    131400   -9.0000 -136.5900      33.5       108       127        60
OIR    2025130    131400   -9.0000 -136.6000      32.9       107       126        60
OIR    2025130    131400   -9.0000 -136.6100      32.8       107       128        60
OIR    2025130    131400   -9.0000 -136.6200      32.6       107       131        60
OIR    2025130    131400   -9.0000 -136.6300      32.1       107       135        60
OIR    2025130    131400   -9.0000 -136.6400      30.0       108       139        60
OIR    2025130    131400   -9.0000 -136.6500      27.6       110       141        60
OIR    2025130    131400   -9.0000 -136.6600      27.1       110       142        60
OIR    2025130    131400   -9.0000 -136.6700      26.9       111       140        60
OIR    2025130    131400   -9.0000 -136.6800      26.8       111       139        60
OIR    2025130    131400   -9.0000 -136.6900      26.8       111       137        60
OIR    2025130    131400   -9.0000 -136.7000      26.7       111       135        60
OIR    2025130    131400   -9.0000 -136.7100      26.8       110       132        60
OIR    2025130    131400   -9.0000 -136.7200      27.1       110       130        60
OIR    2025130    131400   -9.0000 -136.7300      27.1       110       130        60
OIR    2025130    131400   -9.0000 -136.7400      27.0       110       132        60
OIR    2025130    131400   -9.0000 -136.7500      26.7       109       135        60
OIR    2025130    131400   -9.0000 -136.7600      26.4       109       135        60
OIR    2025130    131400   -9.0000 -136.7700      26.2       108       134        60
OIR    2025130    131400   -9.0000 -136.7800      25.7       107       133        60
OIR    2025130    131400   -9.0000 -136.7900      25.1       106       132        60
OIR    2025130    131400   -9.0000 -136.8000      24.2       106       131        60
OIR    2025130    131400   -9.0000 -136.8100      22.7       106       131        60
OIR    2025130    131400   -9.0000 -136.8200      21.2       106       131        60
OIR    2025130    131400   -9.0000 -136.8300      19.5       107       132        60
OIR    2025130    131400   -9.0000 -136.8400      18.2       108       133        60
OIR    2025130    131400   -9.0000 -136.8500      17.3       108       134        60
OIR    2025130    131400   -9.0000 -136.8600      16.7       109       136        60
OIR    2025130    131400   -9.0000 -136.8700      16.1       110       135        60
OIR    2025130    131400   -9.0000 -136.8800      15.8       110       134        60
OIR    2025130    131400   -9.0000 -136.8900      15.6       110       134        60
OIR    2025130    131400   -9.0000 -136.9000      15.5       110       134        60
OIR    2025130    131400   -9.0000 -136.9100      15.4       109       133        60
OIR    2025130    131400   -9.0000 -136.9200      15.4       108       132        60
OIR    2025130    131400   -9.0000 -136.9300      15.4       107       131        60
OIR    2025130    131400   -9.0000 -136.9400      15.4       107       128        60
OIR    2025130    131400   -9.0000 -136.9500      15.4       107       126        60
OIR    2025130    131400   -9.0000 -136.9600      15.5       106       125        60
OIR    2025130    131400   -9.0000 -136.9700      15.6       106       124        60
OIR    2025130    131400   -9.0000 -136.9800      15.7       106       122        60
OIR    2025130    131400   -9.0000 -136.9900      15.8       106       120        60
OIR    2025130    131400   -9.0000 -137.0000      16.0       106       119        60
OIR    2025130    131400   -9.0000 -137.0100      16.2       106       116        60
OIR    2025130    131400   -9.0000 -137.0200      16.3       106       116        60
OIR    2025130    131400   -9.0000 -137.0300      16.5       106       116        60
OIR    2025130    131400   -9.0000 -137.0400      16.7       106       116        60
OIR    2025130    131400   -9.0000 -137.0500      16.8       106       116        60
OIR    2025130    131400   -9.0000 -137.0600      16.8       107       119        60
OIR    2025130    131400   -9.0000 -137.0700      16.9       107       120        60
OIR    2025130    131400   -9.0000 -137.0800      16.7       108       120        60
OIR    2025130    131400   -9.0000 -137.0900      16.2       110       119        60
OIR    2025130    131400   -9.0000 -137.1000      16.4       110       117        60
OIR    2025130    131400   -9.0000 -137.1100      16.7       109       116        60
OIR    2025130    131400   -9.0000 -137.1200      17.2       108       115        60
OIR    2025130    131400   -9.0000 -137.1300      17.5       107       114        60
OIR    2025130    131400   -9.0000 -137.1400      17.7       107       115        60
OIR    2025130    131400   -9.0000 -137.1500      17.8       107       116        60
OIR    2025130    131400   -9.0000 -137.1600      17.7       107       117        60
OIR    2025130    131400   -9.0000 -137.1700      17.4       108       119        60
OIR    2025130    131400   -9.0000 -137.1800      16.6       111       119        60
OIR    2025130    131400   -9.0000 -137.1900      16.2       112       117        60
OIR    2025130    131400   -9.0000 -137.2000      15.9       114       117        60
OIR    2025130    131400   -9.0000 -137.2100      15.7       115       116        60
OIR    2025130    131400   -9.0000 -137.2200      15.5       116       116        60
OIR    2025130    131400   -9.0000 -137.2300      15.4       117       116        60
OIR    2025130    131400   -9.0000 -137.2400      15.3       117       116        60
OIR    2025130    131400   -9.0000 -137.2500      15.2       118       114        60
OIR    2025130    131400   -9.0000 -137.2600      15.2       118       112        60
OIR    2025130    131400   -9.0000 -137.2700      15.2       119       112        60
OIR    2025130    131400   -9.0000 -137.2800      15.3       120       113        60
OIR    2025130    131400   -9.0000 -137.2900      15.3       120       116        60
OIR    2025130    131400   -9.0000 -137.3000      15.4       121       117        60
OIR    2025130    131400   -9.0000 -137.3100      15.5       121       119        60
OIR    2025130    131400   -9.0000 -137.3200      15.9       122       119        60
OIR    2025130    131400   -9.0000 -137.3300      17.0       125       119        60
OIR    2025130    131400   -9.0000 -137.3400      17.6       126       122        60
OIR    2025130    131400   -9.0000 -137.3500      17.8       126       126        60
OIR    2025130    131400   -9.0000 -137.3600      17.8       126       128        60
OIR    2025130    131400   -9.0000 -137.3700      17.8       126       130        60
OIR    2025130    131400   -9.0000 -137.3800      17.8       127       131        60
OIR    2025130    131400   -9.0000 -137.3900      17.8       127       133        60
OIR    2025130    131400   -9.0000 -137.4000      17.8       126       134        60
OIR    2025130    131400   -9.0000 -137.4100      17.8       126       135        60
OIR    2025130    131400   -9.0000 -137.4200      17.6       126       136        60
OIR    2025130    131400   -9.0000 -137.4300      17.2       124       137        60
OIR    2025130    131400   -9.0000 -137.4400      16.6       120       139        60
OIR    2025130    131400   -9.0000 -137.4500      16.5       118       143        60
OIR    2025130    131400   -9.0000 -137.4600      16.9       116       147        60
OIR    2025130    131400   -9.0000 -137.4900      18.9       111       146        60
OIR    2025130    131400   -9.0000 -137.5000      18.8       110       137        60
OIR    2025130    131400   -9.0000 -137.5100      18.5       108       123        60
OIR    2025130    131400   -9.0000 -137.5200      17.4       103       115        60
OIR    2025130    131400   -9.0000 -137.5300      14.5        95       110        60
OIR    2025130    131400   -9.0000 -137.5400      15.3        92       107        60
OIR    2025130    131400   -9.0000 -137.5500      16.0        91       104        60
OIR    2025130    131400   -9.0000 -137.5600      16.2        90       104        60
OIR    2025130    131400   -9.0000 -137.5700      16.2        90       103        60
OIR    2025130    131400   -9.0000 -137.5800      16.1        90       103        60
OIR    2025130    131400   -9.0000 -137.5900      15.9        92       103        60
OIR    2025130    131400   -9.0000 -137.6000      14.9        97       103        60
OIR    2025130    131400   -9.0000 -137.6100       9.5       120       104        60
OIR    2025130    131400   -9.0000 -137.6200       6.3       155       104        60
OIR    2025130    131400   -9.0000 -137.6300       4.2       167       105        60
OIR    2025130    131400   -9.0000 -137.7200      10.2       120       113        60
OIR    2025130    131400   -9.0000 -137.7300      11.7       134       107        60
OIR    2025130    131400   -9.0000 -137.7400       7.7       164       108        60
OIR    2025130    131400   -9.0000 -137.7500       7.0       187       112        60
OIR    2025130    131400   -9.0000 -137.7600       7.4       204       115        60
OIR    2025130    131400   -9.0000 -137.7700       6.9       207       115        60
OIR    2025130    131400   -9.0000 -137.7800       6.2       200       116        60
OIR    2025130    131400   -9.0000 -137.7900       5.9       188       116        60
OIR    2025130    131400   -9.0000 -137.8000       6.1       184       121        60
OIR    2025130    131400   -9.0000 -137.8100       5.7       174       125        60
OIR    2025130    131400   -9.0000 -137.8200       5.2       180       138        60
OIR    2025130    131400   -9.0000 -137.8800       4.7       150       134        60
OIR    2025130    131400   -9.0000 -137.8900       5.0       150       137        60
OIR    2025130    131400   -9.0000 -137.9000       5.4       144       140        60
OIR    2025130    131400   -9.0000 -137.9100       5.5       142       140        60
OIR    2025130    131400   -9.0000 -137.9200       5.4       143       139        60
OIR    2025130    131400   -9.0000 -137.9300       5.5       150       147        60
OIR    2025130    131400   -9.0000 -138.1200      16.0        97       132        60
OIR    2025130    131400   -9.0000 -138.1300      13.4        96       119        60
OIR    2025130    131400   -9.0000 -138.1400       6.6        81       110        60
OIR    2025130    131400   -9.0000 -138.1500       5.4        68       105        60
OIR    2025130    131400   -9.0000 -138.1600       6.5        54       103        60
OIR    2025130    131400   -9.0000 -138.1700       8.8        42       104        60
OIR    2025130    131400   -9.0000 -138.1800      10.5        38       104        60
OIR    2025130    131400   -9.0000 -138.1900      11.4        36       105        60
OIR    2025130    131400   -9.0000 -138.2000      11.8        34       104        60
OIR    2025130    131400   -9.0000 -138.2100      12.4        33       104        60
OIR    2025130    131400   -9.0000 -138.2200      12.8        32       103        60
OIR    2025130    131400   -9.0000 -138.2300      13.1        30       103        60
OIR    2025130    131400   -9.0000 -138.2400      13.4        29       103        60
OIR    2025130    131400   -9.0000 -138.2500      13.6        28       103        60
OIR    2025130    131400   -9.0000 -138.2600      14.0        27       103        60
OIR    2025130    131400   -9.0000 -138.2700      14.7        24       103        60
OIR    2025130    131400   -9.0000 -138.2800      15.5        22       103        60
OIR    2025130    131400   -9.0000 -138.2900      16.1        21       103        60
OIR    2025130    131400   -9.0000 -138.3000      16.7        20       103        60
OIR    2025130    131400   -9.0000 -138.3100      17.9        17       103        60
OIR    2025130    131400   -9.0000 -138.3200      19.3        14       103        60
OIR    2025130    131400   -9.0000 -138.3300      21.2         7       103        60
OIR    2025130    131400   -9.0000 -138.3400      22.9         3       103        60
OIR    2025130    131400   -9.0000 -138.3500      23.8       358       103        60
OIR    2025130    131400   -9.0000 -138.3600      23.8       357       103        60
OIR    2025130    131400   -9.0000 -138.3700      23.9       357       103        60
OIR    2025130    131400   -9.0000 -138.3800      23.8       357       103        60
OIR    2025130    131400   -9.0000 -138.3900      23.8       357       103        60
OIR    2025130    131400   -9.0000 -138.4000      23.8       357       103        60
OIR    2025130    131400   -9.0000 -138.4100      23.8       357       103        60
OIR    2025130    131400   -9.0000 -138.4200      23.7       357       103        60
OIR    2025130    131400   -9.0000 -138.4300      23.7       357       103        60
OIR    2025130    131400   -9.0000 -138.4400      23.7       357       103        60
OIR    2025130    131400   -9.0000 -138.4500      23.7       357       103        60
OIR    2025130    131400   -9.0000 -138.4600      23.9       357       103        60
OIR    2025130    131400   -9.0000 -138.4700      24.1       357       103        60
OIR    2025130    131400   -9.0000 -138.4800      24.3       357       103        60
OIR    2025130    131400   -9.0000 -138.4900      24.7       357       103        60
OIR    2025130    131400   -9.0000 -138.5000      25.0       358       103        60
OIR    2025130    131400   -9.0000 -138.5100      25.2       358       103        60
OIR    2025130    131400   -9.0000 -138.5200      25.3       358       103        60
OIR    2025130    131400   -9.0000 -138.5300      25.3       358       103        60
OIR    2025130    131400   -9.0000 -138.5400      25.3       358       103        60
OIR    2025130    131400   -9.0000 -138.5500      25.3       358       103        60
OIR    2025130    131400   -9.0000 -138.5600      25.3       358       103        60
OIR    2025130    131400   -9.0000 -138.5700      25.2       357       103        60
OIR    2025130    131400   -9.0000 -138.5800      25.1       357       103        60
OIR    2025130    131400   -9.0000 -138.5900      25.0       357       103        60
OIR    2025130    131400   -9.0000 -138.6000      24.7       356       103        60
OIR    2025130    131400   -9.0000 -138.6100      24.1       356       103        60
OIR    2025130    131400   -9.0000 -138.6200      23.4       355       103        60
OIR    2025130    131400   -9.0000 -138.6300      22.7       354       103        60
OIR    2025130    131400   -9.0000 -138.6400      21.9       353       103        60
OIR    2025130    131400   -9.0000 -138.6500      21.1       352       103        60
OIR    2025130    131400   -9.0000 -138.6600      20.3       350       104        60
OIR    2025130    131400   -9.0000 -138.6700      19.5       349       104        60
OIR    2025130    131400   -9.0000 -138.6800      19.0       347       104        60
OIR    2025130    131400   -9.0000 -138.6900      18.4       345       103        60
OIR    2025130    131400   -9.0000 -138.7000      18.0       343       103        60
OIR    2025130    131400   -9.0000 -138.7100      17.7       342       104        60
OIR    2025130    131400   -9.0000 -138.7200      17.5       341       107        60
OIR    2025130    131400   -9.0000 -138.7300      17.4       341       109        60
OIR    2025130    131400   -9.0000 -138.7400      17.3       340       110        60
OIR    2025130    131400   -9.0000 -138.7500      17.2       340       110        60
OIR    2025130    131400   -9.0000 -138.7600      17.1       340       111        60
OIR    2025130    131400   -9.0000 -138.7700      16.9       340       113        60
OIR    2025130    131400   -9.0000 -138.7800      16.5       339       115        60
OIR    2025130    131400   -9.0000 -138.7900      15.9       338       116        60
OIR    2025130    131400   -9.0000 -138.8000      15.3       337       119        60
OIR    2025130    131400   -9.0000 -138.8100      14.9       336       120        60
OIR    2025130    131400   -9.0000 -138.8200      14.6       335       122        60
OIR    2025130    131400   -9.0000 -138.8300      14.3       333       123        60
OIR    2025130    131400   -9.0000 -138.8400      14.0       331       126        60
OIR    2025130    131400   -9.0000 -138.8500      13.8       330       129        60
OIR    2025130    131400   -9.0000 -138.8600      13.6       328       129        60
OIR    2025130    131400   -9.0000 -138.8700      13.4       326       129        60
OIR    2025130    131400   -9.0000 -138.8800      13.3       324       130        60
OIR    2025130    131400   -9.0000 -138.8900      13.2       321       130        60
OIR    2025130    131400   -9.0000 -138.9000      13.4       308       131        60
OIR    2025130    131400   -9.0000 -138.9100      14.0       295       131        60
OIR    2025130    131400   -9.0000 -138.9200      14.0       292       130        60
OIR    2025130    131400   -9.0000 -138.9300      13.9       292       141        60
OIR    2025130    131400   -9.0100 -136.3400      35.7       102       143        60
OIR    2025130    131400   -9.0100 -136.3500      36.0       103       143        60
OIR    2025130    131400   -9.0100 -136.3600      36.6       103       143        60
OIR    2025130    131400   -9.0100 -136.3700      37.0       104       143        60
OIR    2025130    131400   -9.0100 -136.3800      37.0       105       142        60
OIR    2025130    131400   -9.0100 -136.4300      36.7       108       143        60
OIR    2025130    131400   -9.0100 -136.4400      36.6       108       140        60
OIR    2025130    131400   -9.0100 -136.4500      36.5       108       138        60
OIR    2025130    131400   -9.0100 -136.4600      36.5       108       137        60
OIR    2025130    131400   -9.0100 -136.4700      36.4       108       136        60
OIR    2025130    131400   -9.0100 -136.4800      36.4       108       134        60
OIR    2025130    131400   -9.0100 -136.4900      36.3       108       132        60
OIR    2025130    131400   -9.0100 -136.5000      36.3       108       130        60
OIR    2025130    131400   -9.0100 -136.5100      36.2       108       128        60
OIR    2025130    131400   -9.0100 -136.5200      36.0       109       128        60
OIR    2025130    131400   -9.0100 -136.5300      35.9       109       129        60
OIR    2025130    131400   -9.0100 -136.5400      35.8       109       129        60
OIR    2025130    131400   -9.0100 -136.5500      35.7       109       128        60
OIR    2025130    131400   -9.0100 -136.5600      35.5       109       130        60
OIR    2025130    131400   -9.0100 -136.5700      35.1       109       130        60
OIR    2025130    131400   -9.0100 -136.5800      34.6       108       129        60
OIR    2025130    131400   -9.0100 -136.5900      33.8       108       128        60
OIR    2025130    131400   -9.0100 -136.6000      33.0       107       127        60
OIR    2025130    131400   -9.0100 -136.6100      32.9       107       129        60
OIR    2025130    131400   -9.0100 -136.6200      32.8       107       133        60
OIR    2025130    131400   -9.0100 -136.6300      32.4       107       136        60
OIR    2025130    131400   -9.0100 -136.6400      30.9       108       139        60
OIR    2025130    131400   -9.0100 -136.6500      28.7       109       143        60
OIR    2025130    131400   -9.0100 -136.6700      28.1       110       142        60
OIR    2025130    131400   -9.0100 -136.6800      28.0       110       139        60
OIR    2025130    131400   -9.0100 -136.6900      27.8       110       138        60
OIR    2025130    131400   -9.0100 -136.7000      27.7       110       136        60
OIR    2025130    131400   -9.0100 -136.7100      27.5       110       134        60
OIR    2025130    131400   -9.0100 -136.7200      27.5       110       133        60
OIR    2025130    131400   -9.0100 -136.7300      27.6       109       131        60
OIR    2025130    131400   -9.0100 -136.7400      27.5       109       133        60
OIR    2025130    131400   -9.0100 -136.7500      27.0       108       135        60
OIR    2025130    131400   -9.0100 -136.7600      26.7       107       134        60
OIR    2025130    131400   -9.0100 -136.7700      26.4       106       132        60
OIR    2025130    131400   -9.0100 -136.7800      26.0       106       130        60
OIR    2025130    131400   -9.0100 -136.7900      25.4       105       129        60
OIR    2025130    131400   -9.0100 -136.8000      24.7       105       129        60
OIR    2025130    131400   -9.0100 -136.8100      23.3       105       129        60
OIR    2025130    131400   -9.0100 -136.8200      22.0       105       130        60
OIR    2025130    131400   -9.0100 -136.8300      20.0       106       131        60
OIR    2025130    131400   -9.0100 -136.8400      18.6       106       131        60
OIR    2025130    131400   -9.0100 -136.8500      17.8       106       132        60
OIR    2025130    131400   -9.0100 -136.8600      17.1       105       133        60
OIR    2025130    131400   -9.0100 -136.8700      16.5       104       134        60
OIR    2025130    131400   -9.0100 -136.8800      16.1       104       134        60
OIR    2025130    131400   -9.0100 -136.8900      15.9       105       134        60
OIR    2025130    131400   -9.0100 -136.9000      15.7       105       134        60
OIR    2025130    131400   -9.0100 -136.9100      15.6       105       133        60
OIR    2025130    131400   -9.0100 -136.9200      15.6       105       132        60
OIR    2025130    131400   -9.0100 -136.9300      15.6       105       131        60
OIR    2025130    131400   -9.0100 -136.9400      15.7       105       129        60
OIR    2025130    131400   -9.0100 -136.9500      15.7       105       126        60
OIR    2025130    131400   -9.0100 -136.9600      15.7       105       125        60
OIR    2025130    131400   -9.0100 -136.9700      15.8       105       123        60
OIR    2025130    131400   -9.0100 -136.9800      15.9       105       121        60
OIR    2025130    131400   -9.0100 -136.9900      16.0       105       119        60
OIR    2025130    131400   -9.0100 -137.0000      16.2       105       117        60
OIR    2025130    131400   -9.0100 -137.0100      16.3       105       116        60
OIR    2025130    131400   -9.0100 -137.0200      16.5       105       116        60
OIR    2025130    131400   -9.0100 -137.0300      16.7       105       116        60
OIR    2025130    131400   -9.0100 -137.0400      16.9       105       116        60
OIR    2025130    131400   -9.0100 -137.0500      17.0       105       117        60
OIR    2025130    131400   -9.0100 -137.0600      17.1       105       119        60
OIR    2025130    131400   -9.0100 -137.0700      17.2       106       120        60
OIR    2025130    131400   -9.0100 -137.0800      17.2       106       120        60
OIR    2025130    131400   -9.0100 -137.0900      17.1       107       119        60
OIR    2025130    131400   -9.0100 -137.1000      17.2       107       117        60
OIR    2025130    131400   -9.0100 -137.1100      17.5       107       116        60
OIR    2025130    131400   -9.0100 -137.1200      17.8       106       116        60
OIR    2025130    131400   -9.0100 -137.1300      18.0       105       115        60
OIR    2025130    131400   -9.0100 -137.1400      18.1       105       116        60
OIR    2025130    131400   -9.0100 -137.1500      18.1       106       116        60
OIR    2025130    131400   -9.0100 -137.1600      18.1       106       117        60
OIR    2025130    131400   -9.0100 -137.1700      17.9       106       120        60
OIR    2025130    131400   -9.0100 -137.1800      17.3       108       120        60
OIR    2025130    131400   -9.0100 -137.1900      16.5       111       120        60
OIR    2025130    131400   -9.0100 -137.2000      16.1       112       119        60
OIR    2025130    131400   -9.0100 -137.2100      15.8       114       119        60
OIR    2025130    131400   -9.0100 -137.2200      15.6       115       116        60
OIR    2025130    131400   -9.0100 -137.2300      15.4       116       116        60
OIR    2025130    131400   -9.0100 -137.2400      15.3       117       116        60
OIR    2025130    131400   -9.0100 -137.2500      15.2       117       113        60
OIR    2025130    131400   -9.0100 -137.2600      15.2       118       110        60
OIR    2025130    131400   -9.0100 -137.2700      15.2       118       111        60
OIR    2025130    131400   -9.0100 -137.2800      15.3       119       113        60
OIR    2025130    131400   -9.0100 -137.2900      15.4       120       116        60
OIR    2025130    131400   -9.0100 -137.3000      15.5       120       117        60
OIR    2025130    131400   -9.0100 -137.3100      15.6       121       119        60
OIR    2025130    131400   -9.0100 -137.3200      16.2       122       120        60
OIR    2025130    131400   -9.0100 -137.3300      17.3       125       119        60
OIR    2025130    131400   -9.0100 -137.3400      17.8       126       121        60
OIR    2025130    131400   -9.0100 -137.3500      17.8       126       125        60
OIR    2025130    131400   -9.0100 -137.3600      17.8       126       126        60
OIR    2025130    131400   -9.0100 -137.3700      17.8       126       127        60
OIR    2025130    131400   -9.0100 -137.3800      17.8       126       127        60
OIR    2025130    131400   -9.0100 -137.3900      17.8       127       127        60
OIR    2025130    131400   -9.0100 -137.4000      17.8       126       125        60
OIR    2025130    131400   -9.0100 -137.4100      17.7       126       125        60
OIR    2025130    131400   -9.0100 -137.4200      17.7       126       127        60
OIR    2025130    131400   -9.0100 -137.4300      17.4       125       129        60
OIR    2025130    131400   -9.0100 -137.4400      17.0       121       131        60
OIR    2025130    131400   -9.0100 -137.4500      17.1       120       135        60
OIR    2025130    131400   -9.0100 -137.4600      17.9       118       140        60
OIR    2025130    131400   -9.0100 -137.4700      18.5       114       144        60
OIR    2025130    131400   -9.0100 -137.4900      19.6       113       140        60
OIR    2025130    131400   -9.0100 -137.5000      19.6       112       128        60
OIR    2025130    131400   -9.0100 -137.5100      19.8       111       116        60
OIR    2025130    131400   -9.0100 -137.5200      19.9       107       109        60
OIR    2025130    131400   -9.0100 -137.5300      15.4        93       107        60
OIR    2025130    131400   -9.0100 -137.5400      15.8        91       104        60
OIR    2025130    131400   -9.0100 -137.5500      16.1        90       103        60
OIR    2025130    131400   -9.0100 -137.5600      16.2        89       103        60
OIR    2025130    131400   -9.0100 -137.5700      16.2        89       103        60
OIR    2025130    131400   -9.0100 -137.5800      16.2        89       103        60
OIR    2025130    131400   -9.0100 -137.5900      16.1        90       103        60
OIR    2025130    131400   -9.0100 -137.6000      15.5        93       103        60
OIR    2025130    131400   -9.0100 -137.6100       9.6       110       103        60
OIR    2025130    131400   -9.0100 -137.6200       5.2       142       103        60
OIR    2025130    131400   -9.0100 -137.7200       8.6       114       115        60
OIR    2025130    131400   -9.0100 -137.7300       8.3       121       107        60
OIR    2025130    131400   -9.0100 -137.7400       4.4       178       105        60
OIR    2025130    131400   -9.0100 -137.7500       5.5       205       111        60
OIR    2025130    131400   -9.0100 -137.7600       6.2       210       115        60
OIR    2025130    131400   -9.0100 -137.7700       6.0       210       116        60
OIR    2025130    131400   -9.0100 -137.7800       5.2       200       117        60
OIR    2025130    131400   -9.0100 -137.7900       4.6       187       119        60
OIR    2025130    131400   -9.0100 -137.8000       4.6       184       121        60
OIR    2025130    131400   -9.0100 -137.8100       4.6       182       124        60
OIR    2025130    131400   -9.0100 -137.8200       4.5       206       137        60
OIR    2025130    131400   -9.0100 -137.8800       5.1       151       135        60
OIR    2025130    131400   -9.0100 -137.8900       5.3       152       139        60
OIR    2025130    131400   -9.0100 -137.9000       5.9       141       143        60
OIR    2025130    131400   -9.0100 -137.9100       5.9       139       141        60
OIR    2025130    131400   -9.0100 -137.9200       5.6       140       139        60
OIR    2025130    131400   -9.0100 -137.9300       5.3       140       143        60
OIR    2025130    131400   -9.0100 -137.9400       5.1       144       147        60
OIR    2025130    131400   -9.0100 -138.1200      17.5        95       141        60
OIR    2025130    131400   -9.0100 -138.1300      17.0        93       128        60
OIR    2025130    131400   -9.0100 -138.1400       5.5        69       117        60
OIR    2025130    131400   -9.0100 -138.1500       7.1        60       112        60
OIR    2025130    131400   -9.0100 -138.1600       7.7        46       107        60
OIR    2025130    131400   -9.0100 -138.1700      10.1        38       105        60
OIR    2025130    131400   -9.0100 -138.1800      11.8        35       105        60
OIR    2025130    131400   -9.0100 -138.1900      12.6        34       105        60
OIR    2025130    131400   -9.0100 -138.2000      13.2        33       104        60
OIR    2025130    131400   -9.0100 -138.2100      13.5        32       104        60
OIR    2025130    131400   -9.0100 -138.2200      13.9        31       103        60
OIR    2025130    131400   -9.0100 -138.2300      14.2        29       103        60
OIR    2025130    131400   -9.0100 -138.2400      14.5        28       103        60
OIR    2025130    131400   -9.0100 -138.2500      14.8        27       103        60
OIR    2025130    131400   -9.0100 -138.2600      15.2        25       103        60
OIR    2025130    131400   -9.0100 -138.2700      15.8        22       103        60
OIR    2025130    131400   -9.0100 -138.2800      16.3        21       103        60
OIR    2025130    131400   -9.0100 -138.2900      16.9        19       103        60
OIR    2025130    131400   -9.0100 -138.3000      17.8        18       103        60
OIR    2025130    131400   -9.0100 -138.3100      18.8        16       103        60
OIR    2025130    131400   -9.0100 -138.3200      19.9        13       103        60
OIR    2025130    131400   -9.0100 -138.3300      21.2         8       103        60
OIR    2025130    131400   -9.0100 -138.3400      22.5         4       103        60
OIR    2025130    131400   -9.0100 -138.3500      23.9       358       103        60
OIR    2025130    131400   -9.0100 -138.3600      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.3700      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.3800      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.3900      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4000      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4100      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4200      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4300      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4400      23.9       357       103        60
OIR    2025130    131400   -9.0100 -138.4500      24.0       357       103        60
OIR    2025130    131400   -9.0100 -138.4600      24.2       357       103        60
OIR    2025130    131400   -9.0100 -138.4700      24.4       357       103        60
OIR    2025130    131400   -9.0100 -138.4800      24.6       357       103        60
OIR    2025130    131400   -9.0100 -138.4900      24.9       357       103        60
OIR    2025130    131400   -9.0100 -138.5000      25.1       358       103        60
OIR    2025130    131400   -9.0100 -138.5100      25.3       358       103        60
OIR    2025130    131400   -9.0100 -138.5200      25.4       358       103        60
OIR    2025130    131400   -9.0100 -138.5300      25.4       358       103        60
OIR    2025130    131400   -9.0100 -138.5400      25.4       358       103        60
OIR    2025130    131400   -9.0100 -138.5500      25.4       358       103        60
OIR    2025130    131400   -9.0100 -138.5600      25.4       358       103        60
OIR    2025130    131400   -9.0100 -138.5700      25.3       357       103        60
OIR    2025130    131400   -9.0100 -138.5800      25.2       357       103        60
OIR    2025130    131400   -9.0100 -138.5900      25.2       357       103        60
OIR    2025130    131400   -9.0100 -138.6000      25.0       356       103        60
OIR    2025130    131400   -9.0100 -138.6100      24.7       356       103        60
OIR    2025130    131400   -9.0100 -138.6200      24.3       355       103        60
OIR    2025130    131400   -9.0100 -138.6300      23.7       355       103        60
OIR    2025130    131400   -9.0100 -138.6400      23.0       354       103        60
OIR    2025130    131400   -9.0100 -138.6500      22.2       353       104        60
OIR    2025130    131400   -9.0100 -138.6600      21.4       352       104        60
OIR    2025130    131400   -9.0100 -138.6700      20.5       350       104        60
OIR    2025130    131400   -9.0100 -138.6800      19.7       348       104        60
OIR    2025130    131400   -9.0100 -138.6900      19.0       346       103        60
OIR    2025130    131400   -9.0100 -138.7000      18.3       344       104        60
OIR    2025130    131400   -9.0100 -138.7100      17.8       342       104        60
OIR    2025130    131400   -9.0100 -138.7200      17.6       341       105        60
OIR    2025130    131400   -9.0100 -138.7300      17.4       341       108        60
OIR    2025130    131400   -9.0100 -138.7400      17.3       340       111        60
OIR    2025130    131400   -9.0100 -138.7500      17.2       340       112        60
OIR    2025130    131400   -9.0100 -138.7600      17.1       340       113        60
OIR    2025130    131400   -9.0100 -138.7700      17.0       340       114        60
OIR    2025130    131400   -9.0100 -138.7800      16.6       339       116        60
OIR    2025130    131400   -9.0100 -138.7900      16.1       338       116        60
OIR    2025130    131400   -9.0100 -138.8000      15.6       337       119        60
OIR    2025130    131400   -9.0100 -138.8100      15.2       336       121        60
OIR    2025130    131400   -9.0100 -138.8200      14.9       335       123        60
OIR    2025130    131400   -9.0100 -138.8300      14.6       333       125        60
OIR    2025130    131400   -9.0100 -138.8400      14.4       331       127        60
OIR    2025130    131400   -9.0100 -138.8500      14.1       330       129        60
OIR    2025130    131400   -9.0100 -138.8600      14.0       328       129        60
OIR    2025130    131400   -9.0100 -138.8700      13.8       326       129        60
OIR    2025130    131400   -9.0100 -138.8800      13.6       325       129        60
OIR    2025130    131400   -9.0100 -138.8900      13.5       322       129        60
OIR    2025130    131400   -9.0100 -138.9000      13.5       312       131        60
OIR    2025130    131400   -9.0100 -138.9100      13.9       299       131        60
OIR    2025130    131400   -9.0100 -138.9200      14.0       294       130        60
OIR    2025130    131400   -9.0100 -138.9300      14.0       293       136        60
OIR    2025130    131400   -9.0100 -138.9400      13.5       294       143        60
OIR    2025130    131400   -9.0200 -136.3700      37.5       104       143        60
OIR    2025130    131400   -9.0200 -136.3800      37.5       105       141        60
OIR    2025130    131400   -9.0200 -136.4200      37.0       107       141        60
OIR    2025130    131400   -9.0200 -136.4300      36.7       108       138        60
OIR    2025130    131400   -9.0200 -136.4400      36.6       108       136        60
OIR    2025130    131400   -9.0200 -136.4500      36.6       108       135        60
OIR    2025130    131400   -9.0200 -136.4600      36.5       108       135        60
OIR    2025130    131400   -9.0200 -136.4700      36.5       108       134        60
OIR    2025130    131400   -9.0200 -136.4800      36.5       108       133        60
OIR    2025130    131400   -9.0200 -136.4900      36.5       108       131        60
OIR    2025130    131400   -9.0200 -136.5000      36.4       108       129        60
OIR    2025130    131400   -9.0200 -136.5100      36.4       108       128        60
OIR    2025130    131400   -9.0200 -136.5200      36.3       108       129        60
OIR    2025130    131400   -9.0200 -136.5300      36.1       109       129        60
OIR    2025130    131400   -9.0200 -136.5400      36.0       109       129        60
OIR    2025130    131400   -9.0200 -136.5500      35.9       109       130        60
OIR    2025130    131400   -9.0200 -136.5600      35.8       109       132        60
OIR    2025130    131400   -9.0200 -136.5700      35.6       109       132        60
OIR    2025130    131400   -9.0200 -136.5800      35.1       109       131        60
OIR    2025130    131400   -9.0200 -136.5900      34.3       108       130        60
OIR    2025130    131400   -9.0200 -136.6000      33.4       107       129        60
OIR    2025130    131400   -9.0200 -136.6100      33.1       107       132        60
OIR    2025130    131400   -9.0200 -136.6200      32.9       107       136        60
OIR    2025130    131400   -9.0200 -136.6300      32.6       107       138        60
OIR    2025130    131400   -9.0200 -136.6400      31.8       107       140        60
OIR    2025130    131400   -9.0200 -136.6700      28.9       109       141        60
OIR    2025130    131400   -9.0200 -136.6800      28.8       110       138        60
OIR    2025130    131400   -9.0200 -136.6900      28.6       110       137        60
OIR    2025130    131400   -9.0200 -136.7000      28.5       110       136        60
OIR    2025130    131400   -9.0200 -136.7100      28.2       110       136        60
OIR    2025130    131400   -9.0200 -136.7200      28.0       109       134        60
OIR    2025130    131400   -9.0200 -136.7300      28.0       109       132        60
OIR    2025130    131400   -9.0200 -136.7400      28.1       108       133        60
OIR    2025130    131400   -9.0200 -136.7500      27.6       107       134        60
OIR    2025130    131400   -9.0200 -136.7600      27.2       106       133        60
OIR    2025130    131400   -9.0200 -136.7700      26.8       105       131        60
OIR    2025130    131400   -9.0200 -136.7800      26.4       104       129        60
OIR    2025130    131400   -9.0200 -136.7900      25.9       104       127        60
OIR    2025130    131400   -9.0200 -136.8000      25.1       103       127        60
OIR    2025130    131400   -9.0200 -136.8100      23.8       103       127        60
OIR    2025130    131400   -9.0200 -136.8200      22.6       104       128        60
OIR    2025130    131400   -9.0200 -136.8300      20.6       104       129        60
OIR    2025130    131400   -9.0200 -136.8400      19.1       104       129        60
OIR    2025130    131400   -9.0200 -136.8500      18.1       104       130        60
OIR    2025130    131400   -9.0200 -136.8600      17.3       103       131        60
OIR    2025130    131400   -9.0200 -136.8700      16.8       102       132        60
OIR    2025130    131400   -9.0200 -136.8800      16.4       102       132        60
OIR    2025130    131400   -9.0200 -136.8900      16.1       103       133        60
OIR    2025130    131400   -9.0200 -136.9000      15.9       103       133        60
OIR    2025130    131400   -9.0200 -136.9100      15.9       103       132        60
OIR    2025130    131400   -9.0200 -136.9200      15.8       103       131        60
OIR    2025130    131400   -9.0200 -136.9300      15.9       103       130        60
OIR    2025130    131400   -9.0200 -136.9400      15.9       103       128        60
OIR    2025130    131400   -9.0200 -136.9500      15.9       104       126        60
OIR    2025130    131400   -9.0200 -136.9600      16.0       104       124        60
OIR    2025130    131400   -9.0200 -136.9700      16.0       104       122        60
OIR    2025130    131400   -9.0200 -136.9800      16.1       104       120        60
OIR    2025130    131400   -9.0200 -136.9900      16.2       104       119        60
OIR    2025130    131400   -9.0200 -137.0000      16.4       104       117        60
OIR    2025130    131400   -9.0200 -137.0100      16.5       104       116        60
OIR    2025130    131400   -9.0200 -137.0200      16.7       104       116        60
OIR    2025130    131400   -9.0200 -137.0300      16.9       104       116        60
OIR    2025130    131400   -9.0200 -137.0400      17.1       104       116        60
OIR    2025130    131400   -9.0200 -137.0500      17.2       104       117        60
OIR    2025130    131400   -9.0200 -137.0600      17.3       104       119        60
OIR    2025130    131400   -9.0200 -137.0700      17.4       105       119        60
OIR    2025130    131400   -9.0200 -137.0800      17.6       105       119        60
OIR    2025130    131400   -9.0200 -137.0900      17.6       105       119        60
OIR    2025130    131400   -9.0200 -137.1000      17.7       105       119        60
OIR    2025130    131400   -9.0200 -137.1100      17.9       105       119        60
OIR    2025130    131400   -9.0200 -137.1200      18.1       105       116        60
OIR    2025130    131400   -9.0200 -137.1300      18.2       105       115        60
OIR    2025130    131400   -9.0200 -137.1400      18.2       105       116        60
OIR    2025130    131400   -9.0200 -137.1500      18.2       105       116        60
OIR    2025130    131400   -9.0200 -137.1600      18.2       105       117        60
OIR    2025130    131400   -9.0200 -137.1700      18.1       106       121        60
OIR    2025130    131400   -9.0200 -137.1800      17.8       107       121        60
OIR    2025130    131400   -9.0200 -137.1900      17.0       109       121        60
OIR    2025130    131400   -9.0200 -137.2000      16.4       111       121        60
OIR    2025130    131400   -9.0200 -137.2100      16.0       112       120        60
OIR    2025130    131400   -9.0200 -137.2200      15.8       113       117        60
OIR    2025130    131400   -9.0200 -137.2300      15.5       114       116        60
OIR    2025130    131400   -9.0200 -137.2400      15.3       116       116        60
OIR    2025130    131400   -9.0200 -137.2500      15.2       116       114        60
OIR    2025130    131400   -9.0200 -137.2600      15.2       117       112        60
OIR    2025130    131400   -9.0200 -137.2700      15.1       118       111        60
OIR    2025130    131400   -9.0200 -137.2800      15.2       119       112        60
OIR    2025130    131400   -9.0200 -137.2900      15.3       120       115        60
OIR    2025130    131400   -9.0200 -137.3000      15.5       120       116        60
OIR    2025130    131400   -9.0200 -137.3100      15.6       121       116        60
OIR    2025130    131400   -9.0200 -137.3200      16.3       122       116        60
OIR    2025130    131400   -9.0200 -137.3300      17.4       126       115        60
OIR    2025130    131400   -9.0200 -137.3400      17.8       126       116        60
OIR    2025130    131400   -9.0200 -137.3500      17.8       126       117        60
OIR    2025130    131400   -9.0200 -137.3600      17.8       126       117        60
OIR    2025130    131400   -9.0200 -137.3700      17.8       126       119        60
OIR    2025130    131400   -9.0200 -137.3800      17.8       126       117        60
OIR    2025130    131400   -9.0200 -137.3900      17.8       126       116        60
OIR    2025130    131400   -9.0200 -137.4000      17.7       126       113        60
OIR    2025130    131400   -9.0200 -137.4100      17.7       126       112        60
OIR    2025130    131400   -9.0200 -137.4200      17.6       126       113        60
OIR    2025130    131400   -9.0200 -137.4300      17.5       125       114        60
OIR    2025130    131400   -9.0200 -137.4400      17.4       124       116        60
OIR    2025130    131400   -9.0200 -137.4500      17.5       122       122        60
OIR    2025130    131400   -9.0200 -137.4600      18.2       120       128        60
OIR    2025130    131400   -9.0200 -137.4700      18.9       116       136        60
OIR    2025130    131400   -9.0200 -137.4800      20.0       114       144        60
OIR    2025130    131400   -9.0200 -137.4900      19.8       114       134        60
OIR    2025130    131400   -9.0200 -137.5000      19.8       113       121        60
OIR    2025130    131400   -9.0200 -137.5100      20.1       112       110        60
OIR    2025130    131400   -9.0200 -137.5200      20.5       108       104        60
OIR    2025130    131400   -9.0200 -137.5300      15.8        92       104        60
OIR    2025130    131400   -9.0200 -137.5400      16.0        90       103        60
OIR    2025130    131400   -9.0200 -137.5500      16.2        89       103        60
OIR    2025130    131400   -9.0200 -137.5600      16.3        88       103        60
OIR    2025130    131400   -9.0200 -137.5700      16.3        88       103        60
OIR    2025130    131400   -9.0200 -137.5800      16.4        88       103        60
OIR    2025130    131400   -9.0200 -137.5900      16.4        86       103        60
OIR    2025130    131400   -9.0200 -137.6000      15.8        85       103        60
OIR    2025130    131400   -9.0200 -137.6100       9.1        77       103        60
OIR    2025130    131400   -9.0200 -137.6200       4.2        59       103        60
OIR    2025130    131400   -9.0200 -137.7200       8.0       110       116        60
OIR    2025130    131400   -9.0200 -137.7300       7.1       120       107        60
OIR    2025130    131400   -9.0200 -137.7400       4.5       206       105        60
OIR    2025130    131400   -9.0200 -137.7500       5.5       220       111        60
OIR    2025130    131400   -9.0200 -137.7600       5.6       220       116        60
OIR    2025130    131400   -9.0200 -137.7700       5.5       215       120        60
OIR    2025130    131400   -9.0200 -137.7800       4.9       202       122        60
OIR    2025130    131400   -9.0200 -137.7900       4.6       186       123        60
OIR    2025130    131400   -9.0200 -137.8000       4.6       184       124        60
OIR    2025130    131400   -9.0200 -137.8100       4.6       183       126        60
OIR    2025130    131400   -9.0200 -137.8200       4.8       202       140        60
OIR    2025130    131400   -9.0200 -137.8700       4.9       198       139        60
OIR    2025130    131400   -9.0200 -137.8800       5.6       158       136        60
OIR    2025130    131400   -9.0200 -137.8900       5.7       156       141        60
OIR    2025130    131400   -9.0200 -137.9000       6.3       140       147        60
OIR    2025130    131400   -9.0200 -137.9100       6.2       137       143        60
OIR    2025130    131400   -9.0200 -137.9200       5.6       137       139        60
OIR    2025130    131400   -9.0200 -137.9300       5.0       134       136        60
OIR    2025130    131400   -9.0200 -137.9400       4.8       137       136        60
OIR    2025130    131400   -9.0200 -137.9500       4.9       140       144        60
OIR    2025130    131400   -9.0200 -138.1300      15.5        94       138        60
OIR    2025130    131400   -9.0200 -138.1400       7.6        49       128        60
OIR    2025130    131400   -9.0200 -138.1500      11.2        44       119        60
OIR    2025130    131400   -9.0200 -138.1600      15.1        40       112        60
OIR    2025130    131400   -9.0200 -138.1700      14.9        37       109        60
OIR    2025130    131400   -9.0200 -138.1800      13.5        35       105        60
OIR    2025130    131400   -9.0200 -138.1900      14.0        34       104        60
OIR    2025130    131400   -9.0200 -138.2000      14.6        33       104        60
OIR    2025130    131400   -9.0200 -138.2100      14.9        31       103        60
OIR    2025130    131400   -9.0200 -138.2200      15.3        30       103        60
OIR    2025130    131400   -9.0200 -138.2300      15.5        29       103        60
OIR    2025130    131400   -9.0200 -138.2400      15.8        27       103        60
OIR    2025130    131400   -9.0200 -138.2500      16.1        26       103        60
OIR    2025130    131400   -9.0200 -138.2600      16.4        23       103        60
OIR    2025130    131400   -9.0200 -138.2700      16.7        21       103        60
OIR    2025130    131400   -9.0200 -138.2800      17.2        20       103        60
OIR    2025130    131400   -9.0200 -138.2900      17.6        18       103        60
OIR    2025130    131400   -9.0200 -138.3000      18.5        16       103        60
OIR    2025130    131400   -9.0200 -138.3100      19.5        14       103        60
OIR    2025130    131400   -9.0200 -138.3200      20.4        12       103        60
OIR    2025130    131400   -9.0200 -138.3300      21.4         8       103        60
OIR    2025130    131400   -9.0200 -138.3400      22.5         5       103        60
OIR    2025130    131400   -9.0200 -138.3500      24.1       358       103        60
OIR    2025130    131400   -9.0200 -138.3600      24.1       358       103        60
OIR    2025130    131400   -9.0200 -138.3700      24.1       357       103        60
OIR    2025130    131400   -9.0200 -138.3800      24.1       357       103        60
OIR    2025130    131400   -9.0200 -138.3900      24.1       357       103        60
OIR    2025130    131400   -9.0200 -138.4000      24.0       357       103        60
OIR    2025130    131400   -9.0200 -138.4100      24.0       357       103        60
OIR    2025130    131400   -9.0200 -138.4200      24.0       357       103        60
OIR    2025130    131400   -9.0200 -138.4300      24.0       357       103        60
OIR    2025130    131400   -9.0200 -138.4400      24.2       357       103        60
OIR    2025130    131400   -9.0200 -138.4500      24.3       357       103        60
OIR    2025130    131400   -9.0200 -138.4600      24.5       357       103        60
OIR    2025130    131400   -9.0200 -138.4700      24.8       357       103        60
OIR    2025130    131400   -9.0200 -138.4800      25.0       357       103        60
OIR    2025130    131400   -9.0200 -138.4900      25.2       357       103        60
OIR    2025130    131400   -9.0200 -138.5000      25.3       358       103        60
OIR    2025130    131400   -9.0200 -138.5100      25.4       358       103        60
OIR    2025130    131400   -9.0200 -138.5200      25.5       358       103        60
OIR    2025130    131400   -9.0200 -138.5300      25.5       358       103        60
OIR    2025130    131400   -9.0200 -138.5400      25.5       358       103        60
OIR    2025130    131400   -9.0200 -138.5500      25.5       358       103        60
OIR    2025130    131400   -9.0200 -138.5600      25.5       358       103        60
OIR    2025130    131400   -9.0200 -138.5700      25.4       357       103        60
OIR    2025130    131400   -9.0200 -138.5800      25.4       357       103        60
OIR    2025130    131400   -9.0200 -138.5900      25.3       357       104        60
OIR    2025130    131400   -9.0200 -138.6000      25.3       356       104        60
OIR    2025130    131400   -9.0200 -138.6100      25.1       356       104        60
OIR    2025130    131400   -9.0200 -138.6200      24.9       356       103        60
OIR    2025130    131400   -9.0200 -138.6300      24.4       355       103        60
OIR    2025130    131400   -9.0200 -138.6400      23.8       355       104        60
OIR    2025130    131400   -9.0200 -138.6500      23.0       354       104        60
OIR    2025130    131400   -9.0200 -138.6600      22.3       353       104        60
OIR    2025130    131400   -9.0200 -138.6700      21.6       351       105        60
OIR    2025130    131400   -9.0200 -138.6800      20.7       349       104        60
OIR    2025130    131400   -9.0200 -138.6900      19.7       347       104        60
OIR    2025130    131400   -9.0200 -138.7000      18.9       345       105        60
OIR    2025130    131400   -9.0200 -138.7100      18.1       343       104        60
OIR    2025130    131400   -9.0200 -138.7200      17.7       341       104        60
OIR    2025130    131400   -9.0200 -138.7300      17.5       341       107        60
OIR    2025130    131400   -9.0200 -138.7400      17.4       340       112        60
OIR    2025130    131400   -9.0200 -138.7500      17.3       340       114        60
OIR    2025130    131400   -9.0200 -138.7600      17.2       340       115        60
OIR    2025130    131400   -9.0200 -138.7700      17.0       339       115        60
OIR    2025130    131400   -9.0200 -138.7800      16.7       339       115        60
OIR    2025130    131400   -9.0200 -138.7900      16.3       338       116        60
OIR    2025130    131400   -9.0200 -138.8000      15.9       337       117        60
OIR    2025130    131400   -9.0200 -138.8100      15.5       336       120        60
OIR    2025130    131400   -9.0200 -138.8200      15.2       335       122        60
OIR    2025130    131400   -9.0200 -138.8300      14.9       333       125        60
OIR    2025130    131400   -9.0200 -138.8400      14.6       331       126        60
OIR    2025130    131400   -9.0200 -138.8500      14.4       330       127        60
OIR    2025130    131400   -9.0200 -138.8600      14.2       328       127        60
OIR    2025130    131400   -9.0200 -138.8700      14.0       326       127        60
OIR    2025130    131400   -9.0200 -138.8800      13.9       325       127        60
OIR    2025130    131400   -9.0200 -138.8900      13.8       322       128        60
OIR    2025130    131400   -9.0200 -138.9000      13.7       316       129        60
OIR    2025130    131400   -9.0200 -138.9100      13.9       305       131        60
OIR    2025130    131400   -9.0200 -138.9200      14.1       297       133        60
OIR    2025130    131400   -9.0200 -138.9300      14.1       294       132        60
OIR    2025130    131400   -9.0200 -138.9400      14.2       293       130        60
OIR    2025130    131400   -9.0200 -138.9500       9.7       309       141        60
OIR    2025130    131400   -9.0300 -135.1000       7.5       151       140        60
OIR    2025130    131400   -9.0300 -135.5600       5.3       139       128        60
OIR    2025130    131400   -9.0300 -136.3800      37.8       105       142        60
OIR    2025130    131400   -9.0300 -136.4100      37.6       107       143        60
OIR    2025130    131400   -9.0300 -136.4200      37.0       108       139        60
OIR    2025130    131400   -9.0300 -136.4300      36.7       108       136        60
OIR    2025130    131400   -9.0300 -136.4400      36.6       108       134        60
OIR    2025130    131400   -9.0300 -136.4500      36.6       108       134        60
OIR    2025130    131400   -9.0300 -136.4600      36.6       108       134        60
OIR    2025130    131400   -9.0300 -136.4700      36.6       108       133        60
OIR    2025130    131400   -9.0300 -136.4800      36.6       108       132        60
OIR    2025130    131400   -9.0300 -136.4900      36.5       108       130        60
OIR    2025130    131400   -9.0300 -136.5000      36.5       108       129        60
OIR    2025130    131400   -9.0300 -136.5100      36.5       108       129        60
OIR    2025130    131400   -9.0300 -136.5200      36.4       108       129        60
OIR    2025130    131400   -9.0300 -136.5300      36.3       108       130        60
OIR    2025130    131400   -9.0300 -136.5400      36.2       109       130        60
OIR    2025130    131400   -9.0300 -136.5500      36.1       109       131        60
OIR    2025130    131400   -9.0300 -136.5600      36.0       109       133        60
OIR    2025130    131400   -9.0300 -136.5700      35.9       109       133        60
OIR    2025130    131400   -9.0300 -136.5800      35.6       109       132        60
OIR    2025130    131400   -9.0300 -136.5900      34.9       108       131        60
OIR    2025130    131400   -9.0300 -136.6000      34.2       108       131        60
OIR    2025130    131400   -9.0300 -136.6100      33.6       107       134        60
OIR    2025130    131400   -9.0300 -136.6200      33.2       107       138        60
OIR    2025130    131400   -9.0300 -136.6300      32.9       107       140        60
OIR    2025130    131400   -9.0300 -136.6400      32.4       107       141        60
OIR    2025130    131400   -9.0300 -136.6500      31.2       107       144        60
OIR    2025130    131400   -9.0300 -136.6700      29.7       108       140        60
OIR    2025130    131400   -9.0300 -136.6800      29.4       109       137        60
OIR    2025130    131400   -9.0300 -136.6900      29.3       109       137        60
OIR    2025130    131400   -9.0300 -136.7000      29.6       109       137        60
OIR    2025130    131400   -9.0300 -136.7100      29.4       109       138        60
OIR    2025130    131400   -9.0300 -136.7200      28.9       109       136        60
OIR    2025130    131400   -9.0300 -136.7300      28.7       108       133        60
OIR    2025130    131400   -9.0300 -136.7400      28.6       108       132        60
OIR    2025130    131400   -9.0300 -136.7500      28.3       106       131        60
OIR    2025130    131400   -9.0300 -136.7600      27.8       105       130        60
OIR    2025130    131400   -9.0300 -136.7700      27.4       104       129        60
OIR    2025130    131400   -9.0300 -136.7800      27.0       103       127        60
OIR    2025130    131400   -9.0300 -136.7900      26.3       102       126        60
OIR    2025130    131400   -9.0300 -136.8000      25.5       102       125        60
OIR    2025130    131400   -9.0300 -136.8100      24.4       101       127        60
OIR    2025130    131400   -9.0300 -136.8200      23.3       101       128        60
OIR    2025130    131400   -9.0300 -136.8300      21.3       102       128        60
OIR    2025130    131400   -9.0300 -136.8400      19.6       102       127        60
OIR    2025130    131400   -9.0300 -136.8500      18.4       102       128        60
OIR    2025130    131400   -9.0300 -136.8600      17.7       101       129        60
OIR    2025130    131400   -9.0300 -136.8700      17.2       101       130        60
OIR    2025130    131400   -9.0300 -136.8800      16.7       102       131        60
OIR    2025130    131400   -9.0300 -136.8900      16.1       102       132        60
OIR    2025130    131400   -9.0300 -136.9000      16.0       102       132        60
OIR    2025130    131400   -9.0300 -136.9100      16.0       102       131        60
OIR    2025130    131400   -9.0300 -136.9200      16.0       102       130        60
OIR    2025130    131400   -9.0300 -136.9300      16.0       103       128        60
OIR    2025130    131400   -9.0300 -136.9400      16.0       103       127        60
OIR    2025130    131400   -9.0300 -136.9500      16.0       103       124        60
OIR    2025130    131400   -9.0300 -136.9600      16.1       103       123        60
OIR    2025130    131400   -9.0300 -136.9700      16.2       103       121        60
OIR    2025130    131400   -9.0300 -136.9800      16.3       103       120        60
OIR    2025130    131400   -9.0300 -136.9900      16.4       103       119        60
OIR    2025130    131400   -9.0300 -137.0000      16.6       103       116        60
OIR    2025130    131400   -9.0300 -137.0100      16.8       103       116        60
OIR    2025130    131400   -9.0300 -137.0200      16.9       104       116        60
OIR    2025130    131400   -9.0300 -137.0300      17.1       104       116        60
OIR    2025130    131400   -9.0300 -137.0400      17.3       104       116        60
OIR    2025130    131400   -9.0300 -137.0500      17.4       104       116        60
OIR    2025130    131400   -9.0300 -137.0600      17.6       104       117        60
OIR    2025130    131400   -9.0300 -137.0700      17.7       104       117        60
OIR    2025130    131400   -9.0300 -137.0800      17.8       104       117        60
OIR    2025130    131400   -9.0300 -137.0900      17.9       104       117        60
OIR    2025130    131400   -9.0300 -137.1000      18.0       104       117        60
OIR    2025130    131400   -9.0300 -137.1100      18.1       104       119        60
OIR    2025130    131400   -9.0300 -137.1200      18.2       104       116        60
OIR    2025130    131400   -9.0300 -137.1300      18.3       104       115        60
OIR    2025130    131400   -9.0300 -137.1400      18.3       105       115        60
OIR    2025130    131400   -9.0300 -137.1500      18.3       105       115        60
OIR    2025130    131400   -9.0300 -137.1600      18.3       105       117        60
OIR    2025130    131400   -9.0300 -137.1700      18.3       105       121        60
OIR    2025130    131400   -9.0300 -137.1800      18.0       106       123        60
OIR    2025130    131400   -9.0300 -137.1900      17.4       107       123        60
OIR    2025130    131400   -9.0300 -137.2000      16.8       109       121        60
OIR    2025130    131400   -9.0300 -137.2100      16.3       111       120        60
OIR    2025130    131400   -9.0300 -137.2200      16.0       112       119        60
OIR    2025130    131400   -9.0300 -137.2300      15.7       113       117        60
OIR    2025130    131400   -9.0300 -137.2400      15.4       114       116        60
OIR    2025130    131400   -9.0300 -137.2500      15.2       115       114        60
OIR    2025130    131400   -9.0300 -137.2600      15.1       116       111        60
OIR    2025130    131400   -9.0300 -137.2700      15.1       117       111        60
OIR    2025130    131400   -9.0300 -137.2800      15.0       118       111        60
OIR    2025130    131400   -9.0300 -137.2900      15.1       119       115        60
OIR    2025130    131400   -9.0300 -137.3000      15.4       120       116        60
OIR    2025130    131400   -9.0300 -137.3100      15.5       121       115        60
OIR    2025130    131400   -9.0300 -137.3200      16.2       122       113        60
OIR    2025130    131400   -9.0300 -137.3300      17.1       125       111        60
OIR    2025130    131400   -9.0300 -137.3400      17.7       126       111        60
OIR    2025130    131400   -9.0300 -137.3500      17.8       126       111        60
OIR    2025130    131400   -9.0300 -137.3600      17.8       126       112        60
OIR    2025130    131400   -9.0300 -137.3700      17.8       126       112        60
OIR    2025130    131400   -9.0300 -137.3800      17.8       126       111        60
OIR    2025130    131400   -9.0300 -137.3900      17.7       126       109        60
OIR    2025130    131400   -9.0300 -137.4000      17.7       126       107        60
OIR    2025130    131400   -9.0300 -137.4100      17.6       126       105        60
OIR    2025130    131400   -9.0300 -137.4200      17.6       126       107        60
OIR    2025130    131400   -9.0300 -137.4300      17.6       126       108        60
OIR    2025130    131400   -9.0300 -137.4400      17.6       125       111        60
OIR    2025130    131400   -9.0300 -137.4500      17.7       124       114        60
OIR    2025130    131400   -9.0300 -137.4600      18.2       122       117        60
OIR    2025130    131400   -9.0300 -137.4700      18.9       119       126        60
OIR    2025130    131400   -9.0300 -137.4800      20.0       116       133        60
OIR    2025130    131400   -9.0300 -137.4900      19.9       114       126        60
OIR    2025130    131400   -9.0300 -137.5000      19.6       114       116        60
OIR    2025130    131400   -9.0300 -137.5100      19.8       112       107        60
OIR    2025130    131400   -9.0300 -137.5200      20.1       108       103        60
OIR    2025130    131400   -9.0300 -137.5300      15.9        91       103        60
OIR    2025130    131400   -9.0300 -137.5400      16.0        90       103        60
OIR    2025130    131400   -9.0300 -137.5500      16.3        88       103        60
OIR    2025130    131400   -9.0300 -137.5600      16.5        86       103        60
OIR    2025130    131400   -9.0300 -137.5700      16.6        85       103        60
OIR    2025130    131400   -9.0300 -137.5800      16.7        82       103        60
OIR    2025130    131400   -9.0300 -137.5900      16.7        79       103        60
OIR    2025130    131400   -9.0300 -137.6000      15.9        75       103        60
OIR    2025130    131400   -9.0300 -137.6100       8.9        56       103        60
OIR    2025130    131400   -9.0300 -137.6200       6.0        37       103        60
OIR    2025130    131400   -9.0300 -137.6300       4.4        25       103        60
OIR    2025130    131400   -9.0300 -137.7200       7.7        90       115        60
OIR    2025130    131400   -9.0300 -137.7300       4.7        91       107        60
OIR    2025130    131400   -9.0300 -137.7500       5.5       237       113        60
OIR    2025130    131400   -9.0300 -137.7600       5.3       233       120        60
OIR    2025130    131400   -9.0300 -137.7700       5.0       223       126        60
OIR    2025130    131400   -9.0300 -137.7800       4.7       205       130        60
OIR    2025130    131400   -9.0300 -137.7900       4.6       188       131        60
OIR    2025130    131400   -9.0300 -137.8000       4.7       184       133        60
OIR    2025130    131400   -9.0300 -137.8100       4.8       183       136        60
OIR    2025130    131400   -9.0300 -137.8700       6.4       196       145        60
OIR    2025130    131400   -9.0300 -137.8800       6.6       168       141        60
OIR    2025130    131400   -9.0300 -137.8900       6.6       166       145        60
OIR    2025130    131400   -9.0300 -137.9100       6.4       133       144        60
OIR    2025130    131400   -9.0300 -137.9200       5.2       128       138        60
OIR    2025130    131400   -9.0300 -137.9300       4.5       123       134        60
OIR    2025130    131400   -9.0300 -137.9400       4.5       124       132        60
OIR    2025130    131400   -9.0300 -137.9500       4.9       139       139        60
OIR    2025130    131400   -9.0300 -138.1400      12.1        32       138        60
OIR    2025130    131400   -9.0300 -138.1500      14.3        35       128        60
OIR    2025130    131400   -9.0300 -138.1600      17.8        37       119        60
OIR    2025130    131400   -9.0300 -138.1700      18.6        37       112        60
OIR    2025130    131400   -9.0300 -138.1800      17.9        36       107        60
OIR    2025130    131400   -9.0300 -138.1900      16.4        34       103        60
OIR    2025130    131400   -9.0300 -138.2000      16.6        33       103        60
OIR    2025130    131400   -9.0300 -138.2100      16.8        32       103        60
OIR    2025130    131400   -9.0300 -138.2200      16.9        30       103        60
OIR    2025130    131400   -9.0300 -138.2300      16.9        29       103        60
OIR    2025130    131400   -9.0300 -138.2400      17.0        27       103        60
OIR    2025130    131400   -9.0300 -138.2500      17.1        25       103        60
OIR    2025130    131400   -9.0300 -138.2600      17.3        23       103        60
OIR    2025130    131400   -9.0300 -138.2700      17.6        21       103        60
OIR    2025130    131400   -9.0300 -138.2800      18.1        19       103        60
OIR    2025130    131400   -9.0300 -138.2900      18.7        17       103        60
OIR    2025130    131400   -9.0300 -138.3000      19.3        15       103        60
OIR    2025130    131400   -9.0300 -138.3100      20.0        13       103        60
OIR    2025130    131400   -9.0300 -138.3200      20.9        11       103        60
OIR    2025130    131400   -9.0300 -138.3300      22.0         8       103        60
OIR    2025130    131400   -9.0300 -138.3400      23.3         4       103        60
OIR    2025130    131400   -9.0300 -138.3500      24.6       359       103        60
OIR    2025130    131400   -9.0300 -138.3600      24.7       358       103        60
OIR    2025130    131400   -9.0300 -138.3700      24.7       358       103        60
OIR    2025130    131400   -9.0300 -138.3800      24.6       357       103        60
OIR    2025130    131400   -9.0300 -138.3900      24.4       357       103        60
OIR    2025130    131400   -9.0300 -138.4000      24.3       357       103        60
OIR    2025130    131400   -9.0300 -138.4100      24.3       357       103        60
OIR    2025130    131400   -9.0300 -138.4200      24.2       357       103        60
OIR    2025130    131400   -9.0300 -138.4300      24.3       357       103        60
OIR    2025130    131400   -9.0300 -138.4400      24.5       357       103        60
OIR    2025130    131400   -9.0300 -138.4500      24.7       357       103        60
OIR    2025130    131400   -9.0300 -138.4600      24.9       357       103        60
OIR    2025130    131400   -9.0300 -138.4700      25.1       357       103        60
OIR    2025130    131400   -9.0300 -138.4800      25.2       357       103        60
OIR    2025130    131400   -9.0300 -138.4900      25.4       357       103        60
OIR    2025130    131400   -9.0300 -138.5000      25.5       358       103        60
OIR    2025130    131400   -9.0300 -138.5100      25.5       358       103        60
OIR    2025130    131400   -9.0300 -138.5200      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5300      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5400      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5500      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5600      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5700      25.6       358       103        60
OIR    2025130    131400   -9.0300 -138.5800      25.5       357       103        60
OIR    2025130    131400   -9.0300 -138.5900      25.5       357       104        60
OIR    2025130    131400   -9.0300 -138.6000      25.4       356       104        60
OIR    2025130    131400   -9.0300 -138.6100      25.4       356       104        60
OIR    2025130    131400   -9.0300 -138.6200      25.3       356       104        60
OIR    2025130    131400   -9.0300 -138.6300      25.0       355       104        60
OIR    2025130    131400   -9.0300 -138.6400      24.5       355       105        60
OIR    2025130    131400   -9.0300 -138.6500      23.8       354       105        60
OIR    2025130    131400   -9.0300 -138.6600      23.1       353       105        60
OIR    2025130    131400   -9.0300 -138.6700      22.5       352       104        60
OIR    2025130    131400   -9.0300 -138.6800      21.6       351       104        60
OIR    2025130    131400   -9.0300 -138.6900      20.5       349       105        60
OIR    2025130    131400   -9.0300 -138.7000      19.6       347       108        60
OIR    2025130    131400   -9.0300 -138.7100      18.7       344       105        60
OIR    2025130    131400   -9.0300 -138.7200      18.0       342       104        60
OIR    2025130    131400   -9.0300 -138.7300      17.6       340       107        60
OIR    2025130    131400   -9.0300 -138.7400      17.5       340       110        60
OIR    2025130    131400   -9.0300 -138.7500      17.3       340       112        60
OIR    2025130    131400   -9.0300 -138.7600      17.2       339       113        60
OIR    2025130    131400   -9.0300 -138.7700      17.0       339       112        60
OIR    2025130    131400   -9.0300 -138.7800      16.7       339       113        60
OIR    2025130    131400   -9.0300 -138.7900      16.4       338       115        60
OIR    2025130    131400   -9.0300 -138.8000      16.1       337       116        60
OIR    2025130    131400   -9.0300 -138.8100      15.8       336       117        60
OIR    2025130    131400   -9.0300 -138.8200      15.5       334       120        60
OIR    2025130    131400   -9.0300 -138.8300      15.1       333       122        60
OIR    2025130    131400   -9.0300 -138.8400      14.8       331       123        60
OIR    2025130    131400   -9.0300 -138.8500      14.6       329       122        60
OIR    2025130    131400   -9.0300 -138.8600      14.4       328       124        60
OIR    2025130    131400   -9.0300 -138.8700      14.2       326       125        60
OIR    2025130    131400   -9.0300 -138.8800      14.1       325       126        60
OIR    2025130    131400   -9.0300 -138.8900      13.9       322       126        60
OIR    2025130    131400   -9.0300 -138.9000      13.8       318       128        60
OIR    2025130    131400   -9.0300 -138.9100      14.0       309       130        60
OIR    2025130    131400   -9.0300 -138.9200      14.1       303       132        60
OIR    2025130    131400   -9.0300 -138.9300      14.2       297       131        60
OIR    2025130    131400   -9.0300 -138.9400      14.4       293       130        60
OIR    2025130    131400   -9.0300 -138.9500      12.0       294       140        60
OIR    2025130    131400   -9.0400 -135.1000       7.5       151       137        60
OIR    2025130    131400   -9.0400 -136.4200      37.1       108       142        60
OIR    2025130    131400   -9.0400 -136.4300      36.6       108       137        60
OIR    2025130    131400   -9.0400 -136.4400      36.6       108       134        60
OIR    2025130    131400   -9.0400 -136.4500      36.6       108       134        60
OIR    2025130    131400   -9.0400 -136.4600      36.6       108       133        60
OIR    2025130    131400   -9.0400 -136.4700      36.6       108       133        60
OIR    2025130    131400   -9.0400 -136.4800      36.6       108       131        60
OIR    2025130    131400   -9.0400 -136.4900      36.6       108       129        60
OIR    2025130    131400   -9.0400 -136.5000      36.6       108       128        60
OIR    2025130    131400   -9.0400 -136.5100      36.6       108       129        60
OIR    2025130    131400   -9.0400 -136.5200      36.5       108       130        60
OIR    2025130    131400   -9.0400 -136.5300      36.5       108       131        60
OIR    2025130    131400   -9.0400 -136.5400      36.4       108       131        60
OIR    2025130    131400   -9.0400 -136.5500      36.3       108       131        60
OIR    2025130    131400   -9.0400 -136.5600      36.2       109       133        60
OIR    2025130    131400   -9.0400 -136.5700      36.0       109       133        60
OIR    2025130    131400   -9.0400 -136.5800      35.9       109       131        60
OIR    2025130    131400   -9.0400 -136.5900      35.7       109       133        60
OIR    2025130    131400   -9.0400 -136.6000      35.1       108       135        60
OIR    2025130    131400   -9.0400 -136.6100      34.2       108       137        60
OIR    2025130    131400   -9.0400 -136.6200      33.8       107       140        60
OIR    2025130    131400   -9.0400 -136.6300      33.3       107       140        60
OIR    2025130    131400   -9.0400 -136.6400      32.5       106       140        60
OIR    2025130    131400   -9.0400 -136.6500      31.8       105       141        60
OIR    2025130    131400   -9.0400 -136.6600      31.5       104       141        60
OIR    2025130    131400   -9.0400 -136.6700      31.4       104       138        60
OIR    2025130    131400   -9.0400 -136.6800      31.0       106       137        60
OIR    2025130    131400   -9.0400 -136.6900      30.7       107       137        60
OIR    2025130    131400   -9.0400 -136.7000      30.7       107       138        60
OIR    2025130    131400   -9.0400 -136.7100      30.4       107       138        60
OIR    2025130    131400   -9.0400 -136.7200      29.7       107       136        60
OIR    2025130    131400   -9.0400 -136.7300      29.3       107       133        60
OIR    2025130    131400   -9.0400 -136.7400      29.1       106       130        60
OIR    2025130    131400   -9.0400 -136.7500      28.9       105       129        60
OIR    2025130    131400   -9.0400 -136.7600      28.4       104       127        60
OIR    2025130    131400   -9.0400 -136.7700      27.9       103       126        60
OIR    2025130    131400   -9.0400 -136.7800      27.4       102       125        60
OIR    2025130    131400   -9.0400 -136.7900      26.7       100       125        60
OIR    2025130    131400   -9.0400 -136.8000      26.0        99       126        60
OIR    2025130    131400   -9.0400 -136.8100      25.0        99       127        60
OIR    2025130    131400   -9.0400 -136.8200      24.0        98       128        60
OIR    2025130    131400   -9.0400 -136.8300      22.2        98       127        60
OIR    2025130    131400   -9.0400 -136.8400      20.3        99       126        60
OIR    2025130    131400   -9.0400 -136.8500      19.1        99       127        60
OIR    2025130    131400   -9.0400 -136.8600      18.3        99       128        60
OIR    2025130    131400   -9.0400 -136.8700      17.7       100       129        60
OIR    2025130    131400   -9.0400 -136.8800      17.1       100       130        60
OIR    2025130    131400   -9.0400 -136.8900      16.3       101       131        60
OIR    2025130    131400   -9.0400 -136.9000      16.1       101       131        60
OIR    2025130    131400   -9.0400 -136.9100      16.0       102       129        60
OIR    2025130    131400   -9.0400 -136.9200      16.0       102       127        60
OIR    2025130    131400   -9.0400 -136.9300      16.0       102       126        60
OIR    2025130    131400   -9.0400 -136.9400      16.1       102       124        60
OIR    2025130    131400   -9.0400 -136.9500      16.2       102       123        60
OIR    2025130    131400   -9.0400 -136.9600      16.3       102       122        60
OIR    2025130    131400   -9.0400 -136.9700      16.4       102       121        60
OIR    2025130    131400   -9.0400 -136.9800      16.5       102       120        60
OIR    2025130    131400   -9.0400 -136.9900      16.7       102       117        60
OIR    2025130    131400   -9.0400 -137.0000      16.9       102       116        60
OIR    2025130    131400   -9.0400 -137.0100      17.1       103       116        60
OIR    2025130    131400   -9.0400 -137.0200      17.2       103       116        60
OIR    2025130    131400   -9.0400 -137.0300      17.4       103       116        60
OIR    2025130    131400   -9.0400 -137.0400      17.5       103       116        60
OIR    2025130    131400   -9.0400 -137.0500      17.7       103       116        60
OIR    2025130    131400   -9.0400 -137.0600      17.8       103       116        60
OIR    2025130    131400   -9.0400 -137.0700      17.8       103       116        60
OIR    2025130    131400   -9.0400 -137.0800      17.9       103       116        60
OIR    2025130    131400   -9.0400 -137.0900      18.0       103       116        60
OIR    2025130    131400   -9.0400 -137.1000      18.1       104       116        60
OIR    2025130    131400   -9.0400 -137.1100      18.3       104       116        60
OIR    2025130    131400   -9.0400 -137.1200      18.3       104       115        60
OIR    2025130    131400   -9.0400 -137.1300      18.4       104       113        60
OIR    2025130    131400   -9.0400 -137.1400      18.4       104       114        60
OIR    2025130    131400   -9.0400 -137.1500      18.4       104       115        60
OIR    2025130    131400   -9.0400 -137.1600      18.4       104       119        60
OIR    2025130    131400   -9.0400 -137.1700      18.3       104       122        60
OIR    2025130    131400   -9.0400 -137.1800      18.1       105       123        60
OIR    2025130    131400   -9.0400 -137.1900      17.7       106       123        60
OIR    2025130    131400   -9.0400 -137.2000      17.2       108       122        60
OIR    2025130    131400   -9.0400 -137.2100      16.6       109       120        60
OIR    2025130    131400   -9.0400 -137.2200      16.2       110       119        60
OIR    2025130    131400   -9.0400 -137.2300      15.9       111       117        60
OIR    2025130    131400   -9.0400 -137.2400      15.5       112       116        60
OIR    2025130    131400   -9.0400 -137.2500      15.2       113       114        60
OIR    2025130    131400   -9.0400 -137.2600      15.0       115       111        60
OIR    2025130    131400   -9.0400 -137.2700      14.9       116       110        60
OIR    2025130    131400   -9.0400 -137.2800      14.7       117       111        60
OIR    2025130    131400   -9.0400 -137.2900      14.7       119       115        60
OIR    2025130    131400   -9.0400 -137.3000      15.1       120       115        60
OIR    2025130    131400   -9.0400 -137.3100      15.4       121       111        60
OIR    2025130    131400   -9.0400 -137.3200      16.0       122       109        60
OIR    2025130    131400   -9.0400 -137.3300      16.8       124       107        60
OIR    2025130    131400   -9.0400 -137.3400      17.4       125       105        60
OIR    2025130    131400   -9.0400 -137.3500      17.7       126       104        60
OIR    2025130    131400   -9.0400 -137.3600      17.8       126       104        60
OIR    2025130    131400   -9.0400 -137.3700      17.8       126       105        60
OIR    2025130    131400   -9.0400 -137.3800      17.8       126       104        60
OIR    2025130    131400   -9.0400 -137.3900      17.7       126       104        60
OIR    2025130    131400   -9.0400 -137.4000      17.6       126       104        60
OIR    2025130    131400   -9.0400 -137.4100      17.6       126       104        60
OIR    2025130    131400   -9.0400 -137.4200      17.6       126       104        60
OIR    2025130    131400   -9.0400 -137.4300      17.6       126       104        60
OIR    2025130    131400   -9.0400 -137.4400      17.5       125       107        60
OIR    2025130    131400   -9.0400 -137.4500      17.6       125       109        60
OIR    2025130    131400   -9.0400 -137.4600      17.9       124       110        60
OIR    2025130    131400   -9.0400 -137.4700      18.3       123       115        60
OIR    2025130    131400   -9.0400 -137.4800      19.4       119       120        60
OIR    2025130    131400   -9.0400 -137.4900      19.5       115       117        60
OIR    2025130    131400   -9.0400 -137.5000      18.7       114       114        60
OIR    2025130    131400   -9.0400 -137.5100      18.6       111       107        60
OIR    2025130    131400   -9.0400 -137.5200      18.9       105       103        60
OIR    2025130    131400   -9.0400 -137.5300      15.7        91       103        60
OIR    2025130    131400   -9.0400 -137.5400      15.9        88       103        60
OIR    2025130    131400   -9.0400 -137.5500      16.4        85       103        60
OIR    2025130    131400   -9.0400 -137.5600      16.9        81       103        60
OIR    2025130    131400   -9.0400 -137.5700      17.1        77       103        60
OIR    2025130    131400   -9.0400 -137.5800      17.1        73       103        60
OIR    2025130    131400   -9.0400 -137.5900      17.2        68       103        60
OIR    2025130    131400   -9.0400 -137.6000      16.5        64       103        60
OIR    2025130    131400   -9.0400 -137.6100       9.8        39       103        60
OIR    2025130    131400   -9.0400 -137.6200       8.1        26       103        60
OIR    2025130    131400   -9.0400 -137.6300       6.8        18       103        60
OIR    2025130    131400   -9.0400 -137.6400       5.5         7       103        60
OIR    2025130    131400   -9.0400 -137.6500       4.5       353       103        60
OIR    2025130    131400   -9.0400 -137.6800       5.2       292       104        60
OIR    2025130    131400   -9.0400 -137.6900       5.3       309       108        60
OIR    2025130    131400   -9.0400 -137.7000       5.8        25       113        60
OIR    2025130    131400   -9.0400 -137.7100       5.6         8       114        60
OIR    2025130    131400   -9.0400 -137.7200      10.2        49       112        60
OIR    2025130    131400   -9.0400 -137.7300       8.1        35       105        60
OIR    2025130    131400   -9.0400 -137.7500       5.6       254       115        60
OIR    2025130    131400   -9.0400 -137.7600       5.3       239       124        60
OIR    2025130    131400   -9.0400 -137.7700       5.1       226       134        60
OIR    2025130    131400   -9.0400 -137.7800       4.5       209       139        60
OIR    2025130    131400   -9.0400 -137.7900       4.5       192       142        60
OIR    2025130    131400   -9.0400 -137.8000       4.8       187       145        60
OIR    2025130    131400   -9.0400 -137.8800       7.7       179       147        60
OIR    2025130    131400   -9.0400 -137.9100       6.1       128       145        60
OIR    2025130    131400   -9.0400 -137.9200       4.6       116       139        60
OIR    2025130    131400   -9.0400 -137.9300       4.2       112       134        60
OIR    2025130    131400   -9.0400 -137.9400       4.2       114       131        60
OIR    2025130    131400   -9.0400 -137.9500       4.5       132       136        60
OIR    2025130    131400   -9.0400 -137.9600       4.8       136       142        60
OIR    2025130    131400   -9.0400 -138.1500      17.8        29       137        60
OIR    2025130    131400   -9.0400 -138.1600      18.8        36       127        60
OIR    2025130    131400   -9.0400 -138.1700      19.1        37       116        60
OIR    2025130    131400   -9.0400 -138.1800      19.0        37       109        60
OIR    2025130    131400   -9.0400 -138.1900      18.2        35       103        60
OIR    2025130    131400   -9.0400 -138.2000      17.9        34       103        60
OIR    2025130    131400   -9.0400 -138.2100      17.8        32       103        60
OIR    2025130    131400   -9.0400 -138.2200      17.8        31       103        60
OIR    2025130    131400   -9.0400 -138.2300      17.8        29       103        60
OIR    2025130    131400   -9.0400 -138.2400      17.8        27       103        60
OIR    2025130    131400   -9.0400 -138.2500      17.9        25       103        60
OIR    2025130    131400   -9.0400 -138.2600      18.1        22       103        60
OIR    2025130    131400   -9.0400 -138.2700      18.4        20       103        60
OIR    2025130    131400   -9.0400 -138.2800      18.8        18       103        60
OIR    2025130    131400   -9.0400 -138.2900      19.5        16       103        60
OIR    2025130    131400   -9.0400 -138.3000      20.0        14       103        60
OIR    2025130    131400   -9.0400 -138.3100      20.4        12       103        60
OIR    2025130    131400   -9.0400 -138.3200      21.2        10       103        60
OIR    2025130    131400   -9.0400 -138.3300      22.6         6       103        60
OIR    2025130    131400   -9.0400 -138.3400      24.3         2       103        60
OIR    2025130    131400   -9.0400 -138.3500      25.0       359       103        60
OIR    2025130    131400   -9.0400 -138.3600      25.1       358       103        60
OIR    2025130    131400   -9.0400 -138.3700      25.1       358       103        60
OIR    2025130    131400   -9.0400 -138.3800      25.0       358       103        60
OIR    2025130    131400   -9.0400 -138.3900      24.9       357       103        60
OIR    2025130    131400   -9.0400 -138.4000      24.8       357       103        60
OIR    2025130    131400   -9.0400 -138.4100      24.8       357       103        60
OIR    2025130    131400   -9.0400 -138.4200      24.8       357       103        60
OIR    2025130    131400   -9.0400 -138.4300      24.9       357       103        60
OIR    2025130    131400   -9.0400 -138.4400      25.1       357       103        60
OIR    2025130    131400   -9.0400 -138.4500      25.2       357       103        60
OIR    2025130    131400   -9.0400 -138.4600      25.3       357       103        60
OIR    2025130    131400   -9.0400 -138.4700      25.4       357       103        60
OIR    2025130    131400   -9.0400 -138.4800      25.5       357       103        60
OIR    2025130    131400   -9.0400 -138.4900      25.6       358       103        60
OIR    2025130    131400   -9.0400 -138.5000      25.7       358       103        60
OIR    2025130    131400   -9.0400 -138.5100      25.7       358       103        60
OIR    2025130    131400   -9.0400 -138.5200      25.7       358       103        60
OIR    2025130    131400   -9.0400 -138.5300      25.8       358       103        60
OIR    2025130    131400   -9.0400 -138.5400      25.8       358       103        60
OIR    2025130    131400   -9.0400 -138.5500      25.8       358       103        60
OIR    2025130    131400   -9.0400 -138.5600      25.8       358       103        60
OIR    2025130    131400   -9.0400 -138.5700      25.8       358       103        60
OIR    2025130    131400   -9.0400 -138.5800      25.7       357       104        60
OIR    2025130    131400   -9.0400 -138.5900      25.6       357       104        60
OIR    2025130    131400   -9.0400 -138.6000      25.6       356       104        60
OIR    2025130    131400   -9.0400 -138.6100      25.5       356       103        60
OIR    2025130    131400   -9.0400 -138.6200      25.4       356       104        60
OIR    2025130    131400   -9.0400 -138.6300      25.3       355       105        60
OIR    2025130    131400   -9.0400 -138.6400      25.1       355       108        60
OIR    2025130    131400   -9.0400 -138.6500      24.5       354       108        60
OIR    2025130    131400   -9.0400 -138.6600      23.9       354       105        60
OIR    2025130    131400   -9.0400 -138.6700      23.3       353       104        60
OIR    2025130    131400   -9.0400 -138.6800      22.6       352       105        60
OIR    2025130    131400   -9.0400 -138.6900      21.6       350       108        60
OIR    2025130    131400   -9.0400 -138.7000      20.4       348       109        60
OIR    2025130    131400   -9.0400 -138.7100      19.5       345       108        60
OIR    2025130    131400   -9.0400 -138.7200      18.6       342       107        60
OIR    2025130    131400   -9.0400 -138.7300      17.9       341       107        60
OIR    2025130    131400   -9.0400 -138.7400      17.6       340       108        60
OIR    2025130    131400   -9.0400 -138.7500      17.4       339       109        60
OIR    2025130    131400   -9.0400 -138.7600      17.2       339       109        60
OIR    2025130    131400   -9.0400 -138.7700      17.0       339       109        60
OIR    2025130    131400   -9.0400 -138.7800      16.7       338       110        60
OIR    2025130    131400   -9.0400 -138.7900      16.5       338       113        60
OIR    2025130    131400   -9.0400 -138.8000      16.3       337       114        60
OIR    2025130    131400   -9.0400 -138.8100      16.0       336       115        60
OIR    2025130    131400   -9.0400 -138.8200      15.7       334       116        60
OIR    2025130    131400   -9.0400 -138.8300      15.3       332       119        60
OIR    2025130    131400   -9.0400 -138.8400      14.9       330       119        60
OIR    2025130    131400   -9.0400 -138.8500      14.7       329       116        60
OIR    2025130    131400   -9.0400 -138.8600      14.6       327       121        60
OIR    2025130    131400   -9.0400 -138.8700      14.3       326       124        60
OIR    2025130    131400   -9.0400 -138.8800      14.1       324       124        60
OIR    2025130    131400   -9.0400 -138.8900      14.0       322       125        60
OIR    2025130    131400   -9.0400 -138.9000      13.8       318       127        60
OIR    2025130    131400   -9.0400 -138.9100      14.2       310       128        60
OIR    2025130    131400   -9.0400 -138.9200      14.2       307       129        60
OIR    2025130    131400   -9.0400 -138.9300      14.2       303       132        60
OIR    2025130    131400   -9.0400 -138.9400      14.3       297       135        60
OIR    2025130    131400   -9.0400 -138.9500      13.0       296       141        60
OIR    2025130    131400   -9.0500 -136.4300      36.6       108       139        60
OIR    2025130    131400   -9.0500 -136.4400      36.6       108       135        60
OIR    2025130    131400   -9.0500 -136.4500      36.6       108       135        60
OIR    2025130    131400   -9.0500 -136.4600      36.6       108       134        60
OIR    2025130    131400   -9.0500 -136.4700      36.6       108       133        60
OIR    2025130    131400   -9.0500 -136.4800      36.6       108       131        60
OIR    2025130    131400   -9.0500 -136.4900      36.6       108       129        60
OIR    2025130    131400   -9.0500 -136.5000      36.6       108       129        60
OIR    2025130    131400   -9.0500 -136.5100      36.6       108       129        60
OIR    2025130    131400   -9.0500 -136.5200      36.6       108       131        60
OIR    2025130    131400   -9.0500 -136.5300      36.6       108       132        60
OIR    2025130    131400   -9.0500 -136.5400      36.5       108       132        60
OIR    2025130    131400   -9.0500 -136.5500      36.4       108       132        60
OIR    2025130    131400   -9.0500 -136.5600      36.3       108       133        60
OIR    2025130    131400   -9.0500 -136.5700      36.1       109       133        60
OIR    2025130    131400   -9.0500 -136.5800      36.0       109       132        60
OIR    2025130    131400   -9.0500 -136.5900      35.8       109       135        60
OIR    2025130    131400   -9.0500 -136.6000      35.5       108       138        60
OIR    2025130    131400   -9.0500 -136.6100      34.8       108       139        60
OIR    2025130    131400   -9.0500 -136.6200      34.1       107       140        60
OIR    2025130    131400   -9.0500 -136.6300      33.3       106       139        60
OIR    2025130    131400   -9.0500 -136.6400      32.3       105       139        60
OIR    2025130    131400   -9.0500 -136.6500      31.8       104       139        60
OIR    2025130    131400   -9.0500 -136.6600      31.8       104       139        60
OIR    2025130    131400   -9.0500 -136.6700      31.7       104       136        60
OIR    2025130    131400   -9.0500 -136.6800      31.7       104       136        60
OIR    2025130    131400   -9.0500 -136.6900      31.7       104       138        60
OIR    2025130    131400   -9.0500 -136.7000      31.6       105       138        60
OIR    2025130    131400   -9.0500 -136.7100      31.1       105       139        60
OIR    2025130    131400   -9.0500 -136.7200      30.4       105       136        60
OIR    2025130    131400   -9.0500 -136.7300      29.8       105       131        60
OIR    2025130    131400   -9.0500 -136.7400      29.5       104       128        60
OIR    2025130    131400   -9.0500 -136.7500      29.3       103       126        60
OIR    2025130    131400   -9.0500 -136.7600      28.9       102       124        60
OIR    2025130    131400   -9.0500 -136.7700      28.3       101       124        60
OIR    2025130    131400   -9.0500 -136.7800      27.6        99       123        60
OIR    2025130    131400   -9.0500 -136.7900      27.1        98       124        60
OIR    2025130    131400   -9.0500 -136.8000      26.5        97       125        60
OIR    2025130    131400   -9.0500 -136.8100      25.5        96       126        60
OIR    2025130    131400   -9.0500 -136.8200      24.5        96       128        60
OIR    2025130    131400   -9.0500 -136.8300      23.0        96       127        60
OIR    2025130    131400   -9.0500 -136.8400      21.3        96       126        60
OIR    2025130    131400   -9.0500 -136.8500      20.0        96       126        60
OIR    2025130    131400   -9.0500 -136.8600      19.1        97       127        60
OIR    2025130    131400   -9.0500 -136.8700      18.3        97       129        60
OIR    2025130    131400   -9.0500 -136.8800      17.4        98       130        60
OIR    2025130    131400   -9.0500 -136.8900      16.6        99       131        60
OIR    2025130    131400   -9.0500 -136.9000      16.3       100       130        60
OIR    2025130    131400   -9.0500 -136.9100      16.2       101       128        60
OIR    2025130    131400   -9.0500 -136.9200      16.1       101       126        60
OIR    2025130    131400   -9.0500 -136.9300      16.2       101       124        60
OIR    2025130    131400   -9.0500 -136.9400      16.2       101       123        60
OIR    2025130    131400   -9.0500 -136.9500      16.4       101       122        60
OIR    2025130    131400   -9.0500 -136.9600      16.5       101       121        60
OIR    2025130    131400   -9.0500 -136.9700      16.6       101       120        60
OIR    2025130    131400   -9.0500 -136.9800      16.8       101       119        60
OIR    2025130    131400   -9.0500 -136.9900      17.0       101       117        60
OIR    2025130    131400   -9.0500 -137.0000      17.3       101       116        60
OIR    2025130    131400   -9.0500 -137.0100      17.5       102       116        60
OIR    2025130    131400   -9.0500 -137.0200      17.6       102       115        60
OIR    2025130    131400   -9.0500 -137.0300      17.7       102       115        60
OIR    2025130    131400   -9.0500 -137.0400      17.8       102       115        60
OIR    2025130    131400   -9.0500 -137.0500      17.9       102       116        60
OIR    2025130    131400   -9.0500 -137.0600      18.0       102       116        60
OIR    2025130    131400   -9.0500 -137.0700      18.0       102       116        60
OIR    2025130    131400   -9.0500 -137.0800      18.1       103       116        60
OIR    2025130    131400   -9.0500 -137.0900      18.2       103       116        60
OIR    2025130    131400   -9.0500 -137.1000      18.3       103       115        60
OIR    2025130    131400   -9.0500 -137.1100      18.4       103       115        60
OIR    2025130    131400   -9.0500 -137.1200      18.5       103       114        60
OIR    2025130    131400   -9.0500 -137.1300      18.5       103       113        60
OIR    2025130    131400   -9.0500 -137.1400      18.5       103       115        60
OIR    2025130    131400   -9.0500 -137.1500      18.5       103       116        60
OIR    2025130    131400   -9.0500 -137.1600      18.5       104       119        60
OIR    2025130    131400   -9.0500 -137.1700      18.4       104       121        60
OIR    2025130    131400   -9.0500 -137.1800      18.2       104       122        60
OIR    2025130    131400   -9.0500 -137.1900      17.9       105       122        60
OIR    2025130    131400   -9.0500 -137.2000      17.4       106       121        60
OIR    2025130    131400   -9.0500 -137.2100      16.9       107       120        60
OIR    2025130    131400   -9.0500 -137.2200      16.5       108       119        60
OIR    2025130    131400   -9.0500 -137.2300      16.1       109       117        60
OIR    2025130    131400   -9.0500 -137.2400      15.6       110       116        60
OIR    2025130    131400   -9.0500 -137.2500      15.3       111       114        60
OIR    2025130    131400   -9.0500 -137.2600      15.0       112       111        60
OIR    2025130    131400   -9.0500 -137.2700      14.6       114       110        60
OIR    2025130    131400   -9.0500 -137.2800      14.2       115       111        60
OIR    2025130    131400   -9.0500 -137.2900      13.9       117       113        60
OIR    2025130    131400   -9.0500 -137.3000      14.1       119       113        60
OIR    2025130    131400   -9.0500 -137.3100      14.9       120       109        60
OIR    2025130    131400   -9.0500 -137.3200      15.7       120       105        60
OIR    2025130    131400   -9.0500 -137.3300      16.3       121       104        60
OIR    2025130    131400   -9.0500 -137.3400      16.6       121       104        60
OIR    2025130    131400   -9.0500 -137.3500      17.0       121       103        60
OIR    2025130    131400   -9.0500 -137.3600      17.1       121       104        60
OIR    2025130    131400   -9.0500 -137.3700      17.2       123       104        60
OIR    2025130    131400   -9.0500 -137.3800      17.2       123       104        60
OIR    2025130    131400   -9.0500 -137.3900      17.3       124       103        60
OIR    2025130    131400   -9.0500 -137.4000      17.5       125       103        60
OIR    2025130    131400   -9.0500 -137.4100      17.5       125       103        60
OIR    2025130    131400   -9.0500 -137.4200      17.5       126       103        60
OIR    2025130    131400   -9.0500 -137.4300      17.5       126       104        60
OIR    2025130    131400   -9.0500 -137.4400      17.5       126       104        60
OIR    2025130    131400   -9.0500 -137.4500      17.5       126       105        60
OIR    2025130    131400   -9.0500 -137.4600      17.5       126       105        60
OIR    2025130    131400   -9.0500 -137.4700      17.6       125       109        60
OIR    2025130    131400   -9.0500 -137.4800      18.0       123       111        60
OIR    2025130    131400   -9.0500 -137.4900      18.2       115       112        60
OIR    2025130    131400   -9.0500 -137.5000      17.5       111       111        60
OIR    2025130    131400   -9.0500 -137.5100      16.9       109       104        60
OIR    2025130    131400   -9.0500 -137.5200      17.4       101       103        60
OIR    2025130    131400   -9.0500 -137.5300      15.4        90       103        60
OIR    2025130    131400   -9.0500 -137.5400      15.7        85       103        60
OIR    2025130    131400   -9.0500 -137.5500      16.4        79       103        60
OIR    2025130    131400   -9.0500 -137.5600      17.3        71       103        60
OIR    2025130    131400   -9.0500 -137.5700      17.9        65       103        60
OIR    2025130    131400   -9.0500 -137.5800      17.8        61       103        60
OIR    2025130    131400   -9.0500 -137.5900      17.6        57       103        60
OIR    2025130    131400   -9.0500 -137.6000      17.0        54       103        60
OIR    2025130    131400   -9.0500 -137.6100      11.6        25       103        60
OIR    2025130    131400   -9.0500 -137.6200      10.9        18       103        60
OIR    2025130    131400   -9.0500 -137.6300      10.1        13       103        60
OIR    2025130    131400   -9.0500 -137.6400       8.8         6       103        60
OIR    2025130    131400   -9.0500 -137.6500       7.8       356       103        60
OIR    2025130    131400   -9.0500 -137.6600       6.8       347       103        60
OIR    2025130    131400   -9.0500 -137.6700       6.7       331       103        60
OIR    2025130    131400   -9.0500 -137.6800       8.8       317       103        60
OIR    2025130    131400   -9.0500 -137.6900       9.9       325       109        60
OIR    2025130    131400   -9.0500 -137.7000       9.8        14       115        60
OIR    2025130    131400   -9.0500 -137.7100       9.5         4       116        60
OIR    2025130    131400   -9.0500 -137.7200      12.9        30       114        60
OIR    2025130    131400   -9.0500 -137.7300      12.6        22       108        60
OIR    2025130    131400   -9.0500 -137.7400       7.2       332       111        60
OIR    2025130    131400   -9.0500 -137.7500       5.5       276       122        60
OIR    2025130    131400   -9.0500 -137.7600       5.4       246       131        60
OIR    2025130    131400   -9.0500 -137.7700       5.0       236       141        60
OIR    2025130    131400   -9.0500 -137.8000       4.8       193       147        60
OIR    2025130    131400   -9.0500 -137.9200       4.1       105       146        60
OIR    2025130    131400   -9.0500 -137.9300       4.1       102       140        60
OIR    2025130    131400   -9.0500 -137.9400       4.0       101       136        60
OIR    2025130    131400   -9.0500 -137.9600       4.4       123       146        60
OIR    2025130    131400   -9.0500 -138.1500      18.8        22       140        60
OIR    2025130    131400   -9.0500 -138.1600      20.2        36       128        60
OIR    2025130    131400   -9.0500 -138.1700      20.3        38       119        60
OIR    2025130    131400   -9.0500 -138.1800      19.8        37       112        60
OIR    2025130    131400   -9.0500 -138.1900      19.0        35       104        60
OIR    2025130    131400   -9.0500 -138.2000      18.7        34       104        60
OIR    2025130    131400   -9.0500 -138.2100      18.6        33       103        60
OIR    2025130    131400   -9.0500 -138.2200      18.6        31       103        60
OIR    2025130    131400   -9.0500 -138.2300      18.6        30       103        60
OIR    2025130    131400   -9.0500 -138.2400      18.6        28       103        60
OIR    2025130    131400   -9.0500 -138.2500      18.6        25       103        60
OIR    2025130    131400   -9.0500 -138.2600      18.8        22       103        60
OIR    2025130    131400   -9.0500 -138.2700      19.1        19       103        60
OIR    2025130    131400   -9.0500 -138.2800      19.5        17       103        60
OIR    2025130    131400   -9.0500 -138.2900      19.9        15       103        60
OIR    2025130    131400   -9.0500 -138.3000      20.4        14       103        60
OIR    2025130    131400   -9.0500 -138.3100      20.9        11       103        60
OIR    2025130    131400   -9.0500 -138.3200      21.6         9       103        60
OIR    2025130    131400   -9.0500 -138.3300      23.1         4       103        60
OIR    2025130    131400   -9.0500 -138.3400      24.7       360       103        60
OIR    2025130    131400   -9.0500 -138.3500      25.2       359       103        60
OIR    2025130    131400   -9.0500 -138.3600      25.3       358       103        60
OIR    2025130    131400   -9.0500 -138.3700      25.3       358       103        60
OIR    2025130    131400   -9.0500 -138.3800      25.3       358       103        60
OIR    2025130    131400   -9.0500 -138.3900      25.2       358       103        60
OIR    2025130    131400   -9.0500 -138.4000      25.3       357       103        60
OIR    2025130    131400   -9.0500 -138.4100      25.3       357       103        60
OIR    2025130    131400   -9.0500 -138.4200      25.4       357       103        60
OIR    2025130    131400   -9.0500 -138.4300      25.6       357       103        60
OIR    2025130    131400   -9.0500 -138.4400      25.7       357       103        60
OIR    2025130    131400   -9.0500 -138.4500      25.9       357       103        60
OIR    2025130    131400   -9.0500 -138.4600      26.0       357       103        60
OIR    2025130    131400   -9.0500 -138.4700      26.1       357       103        60
OIR    2025130    131400   -9.0500 -138.4800      26.2       357       103        60
OIR    2025130    131400   -9.0500 -138.4900      26.1       357       103        60
OIR    2025130    131400   -9.0500 -138.5000      26.1       358       103        60
OIR    2025130    131400   -9.0500 -138.5100      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5200      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5300      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5400      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5500      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5600      26.0       358       103        60
OIR    2025130    131400   -9.0500 -138.5700      26.0       358       104        60
OIR    2025130    131400   -9.0500 -138.5800      25.9       357       107        60
OIR    2025130    131400   -9.0500 -138.5900      25.7       357       107        60
OIR    2025130    131400   -9.0500 -138.6000      25.6       356       105        60
OIR    2025130    131400   -9.0500 -138.6100      25.5       356       104        60
OIR    2025130    131400   -9.0500 -138.6200      25.5       356       104        60
OIR    2025130    131400   -9.0500 -138.6300      25.4       355       107        60
OIR    2025130    131400   -9.0500 -138.6400      25.3       355       108        60
OIR    2025130    131400   -9.0500 -138.6500      25.0       355       108        60
OIR    2025130    131400   -9.0500 -138.6600      24.5       354       107        60
OIR    2025130    131400   -9.0500 -138.6700      23.9       353       107        60
OIR    2025130    131400   -9.0500 -138.6800      23.3       352       107        60
OIR    2025130    131400   -9.0500 -138.6900      22.5       351       107        60
OIR    2025130    131400   -9.0500 -138.7000      21.6       349       109        60
OIR    2025130    131400   -9.0500 -138.7100      20.7       346       108        60
OIR    2025130    131400   -9.0500 -138.7200      19.7       344       107        60
OIR    2025130    131400   -9.0500 -138.7300      18.6       341       107        60
OIR    2025130    131400   -9.0500 -138.7400      17.8       340       108        60
OIR    2025130    131400   -9.0500 -138.7500      17.4       339       109        60
OIR    2025130    131400   -9.0500 -138.7600      17.2       339       110        60
OIR    2025130    131400   -9.0500 -138.7700      17.0       339       111        60
OIR    2025130    131400   -9.0500 -138.7800      16.8       338       111        60
OIR    2025130    131400   -9.0500 -138.7900      16.5       338       112        60
OIR    2025130    131400   -9.0500 -138.8000      16.3       337       113        60
OIR    2025130    131400   -9.0500 -138.8100      16.1       335       114        60
OIR    2025130    131400   -9.0500 -138.8200      15.8       334       116        60
OIR    2025130    131400   -9.0500 -138.8300      15.4       332       117        60
OIR    2025130    131400   -9.0500 -138.8400      15.0       330       117        60
OIR    2025130    131400   -9.0500 -138.8500      14.9       328       117        60
OIR    2025130    131400   -9.0500 -138.8600      14.7       327       121        60
OIR    2025130    131400   -9.0500 -138.8700      14.4       325       124        60
OIR    2025130    131400   -9.0500 -138.8800      14.2       324       124        60
OIR    2025130    131400   -9.0500 -138.8900      14.1       320       125        60
OIR    2025130    131400   -9.0500 -138.9000      14.0       318       127        60
OIR    2025130    131400   -9.0500 -138.9100      14.3       310       129        60
OIR    2025130    131400   -9.0500 -138.9200      14.2       309       130        60
OIR    2025130    131400   -9.0500 -138.9300      14.2       307       132        60
OIR    2025130    131400   -9.0500 -138.9400      13.8       306       134        60
OIR    2025130    131400   -9.0500 -138.9500      13.5       303       143        60
OIR    2025130    131400   -9.0600 -136.4300      36.6       108       141        60
OIR    2025130    131400   -9.0600 -136.4400      36.6       108       136        60
OIR    2025130    131400   -9.0600 -136.4500      36.6       108       137        60
OIR    2025130    131400   -9.0600 -136.4600      36.6       108       136        60
OIR    2025130    131400   -9.0600 -136.4700      36.6       108       132        60
OIR    2025130    131400   -9.0600 -136.4800      36.6       108       131        60
OIR    2025130    131400   -9.0600 -136.4900      36.6       108       130        60
OIR    2025130    131400   -9.0600 -136.5000      36.6       108       130        60
OIR    2025130    131400   -9.0600 -136.5100      36.6       108       131        60
OIR    2025130    131400   -9.0600 -136.5200      36.6       108       131        60
OIR    2025130    131400   -9.0600 -136.5300      36.6       108       131        60
OIR    2025130    131400   -9.0600 -136.5400      36.6       108       132        60
OIR    2025130    131400   -9.0600 -136.5500      36.5       108       132        60
OIR    2025130    131400   -9.0600 -136.5600      36.3       108       133        60
OIR    2025130    131400   -9.0600 -136.5700      36.1       109       133        60
OIR    2025130    131400   -9.0600 -136.5800      36.0       109       133        60
OIR    2025130    131400   -9.0600 -136.5900      35.9       109       136        60
OIR    2025130    131400   -9.0600 -136.6000      35.6       108       140        60
OIR    2025130    131400   -9.0600 -136.6100      34.8       108       140        60
OIR    2025130    131400   -9.0600 -136.6200      33.7       107       139        60
OIR    2025130    131400   -9.0600 -136.6300      32.9       105       138        60
OIR    2025130    131400   -9.0600 -136.6400      32.0       104       138        60
OIR    2025130    131400   -9.0600 -136.6500      31.8       104       138        60
OIR    2025130    131400   -9.0600 -136.6600      31.8       104       137        60
OIR    2025130    131400   -9.0600 -136.6700      31.8       104       133        60
OIR    2025130    131400   -9.0600 -136.6800      31.8       103       134        60
OIR    2025130    131400   -9.0600 -136.6900      31.9       103       138        60
OIR    2025130    131400   -9.0600 -136.7000      31.9       103       139        60
OIR    2025130    131400   -9.0600 -136.7100      31.5       103       140        60
OIR    2025130    131400   -9.0600 -136.7200      31.1       103       135        60
OIR    2025130    131400   -9.0600 -136.7300      30.7       102       129        60
OIR    2025130    131400   -9.0600 -136.7400      30.3       102       125        60
OIR    2025130    131400   -9.0600 -136.7500      29.8       101       122        60
OIR    2025130    131400   -9.0600 -136.7600      29.0        99       122        60
OIR    2025130    131400   -9.0600 -136.7700      28.4        97       121        60
OIR    2025130    131400   -9.0600 -136.7800      27.9        96       121        60
OIR    2025130    131400   -9.0600 -136.7900      27.5        96       122        60
OIR    2025130    131400   -9.0600 -136.8000      27.0        95       124        60
OIR    2025130    131400   -9.0600 -136.8100      26.0        94       126        60
OIR    2025130    131400   -9.0600 -136.8200      25.2        94       127        60
OIR    2025130    131400   -9.0600 -136.8300      23.8        94       127        60
OIR    2025130    131400   -9.0600 -136.8400      22.3        93       127        60
OIR    2025130    131400   -9.0600 -136.8500      21.0        93       127        60
OIR    2025130    131400   -9.0600 -136.8600      20.1        92       128        60
OIR    2025130    131400   -9.0600 -136.8700      19.3        93       129        60
OIR    2025130    131400   -9.0600 -136.8800      18.2        94       130        60
OIR    2025130    131400   -9.0600 -136.8900      17.2        97       130        60
OIR    2025130    131400   -9.0600 -136.9000      16.6        98       129        60
OIR    2025130    131400   -9.0600 -136.9100      16.4        99       127        60
OIR    2025130    131400   -9.0600 -136.9200      16.3       100       125        60
OIR    2025130    131400   -9.0600 -136.9300      16.3       100       123        60
OIR    2025130    131400   -9.0600 -136.9400      16.4       100       122        60
OIR    2025130    131400   -9.0600 -136.9500      16.6       100       121        60
OIR    2025130    131400   -9.0600 -136.9600      16.8       100       120        60
OIR    2025130    131400   -9.0600 -136.9700      17.0       100       120        60
OIR    2025130    131400   -9.0600 -136.9800      17.2       100       119        60
OIR    2025130    131400   -9.0600 -136.9900      17.4       100       117        60
OIR    2025130    131400   -9.0600 -137.0000      17.7       100       116        60
OIR    2025130    131400   -9.0600 -137.0100      17.9       100       115        60
OIR    2025130    131400   -9.0600 -137.0200      18.0       101       113        60
OIR    2025130    131400   -9.0600 -137.0300      18.0       101       114        60
OIR    2025130    131400   -9.0600 -137.0400      18.1       101       115        60
OIR    2025130    131400   -9.0600 -137.0500      18.2       101       116        60
OIR    2025130    131400   -9.0600 -137.0600      18.3       101       116        60
OIR    2025130    131400   -9.0600 -137.0700      18.2       101       116        60
OIR    2025130    131400   -9.0600 -137.0800      18.3       101       116        60
OIR    2025130    131400   -9.0600 -137.0900      18.4       102       115        60
OIR    2025130    131400   -9.0600 -137.1000      18.5       102       115        60
OIR    2025130    131400   -9.0600 -137.1100      18.6       102       114        60
OIR    2025130    131400   -9.0600 -137.1200      18.6       102       114        60
OIR    2025130    131400   -9.0600 -137.1300      18.6       102       113        60
OIR    2025130    131400   -9.0600 -137.1400      18.6       102       116        60
OIR    2025130    131400   -9.0600 -137.1500      18.6       103       120        60
OIR    2025130    131400   -9.0600 -137.1600      18.6       103       120        60
OIR    2025130    131400   -9.0600 -137.1700      18.5       103       120        60
OIR    2025130    131400   -9.0600 -137.1800      18.3       103       120        60
OIR    2025130    131400   -9.0600 -137.1900      18.0       104       120        60
OIR    2025130    131400   -9.0600 -137.2000      17.6       104       119        60
OIR    2025130    131400   -9.0600 -137.2100      17.1       105       119        60
OIR    2025130    131400   -9.0600 -137.2200      16.7       106       117        60
OIR    2025130    131400   -9.0600 -137.2300      16.2       106       116        60
OIR    2025130    131400   -9.0600 -137.2400      15.7       107       116        60
OIR    2025130    131400   -9.0600 -137.2500      15.3       108       114        60
OIR    2025130    131400   -9.0600 -137.2600      14.9       109       113        60
OIR    2025130    131400   -9.0600 -137.2700      14.4       110       111        60
OIR    2025130    131400   -9.0600 -137.2800      13.6       110       110        60
OIR    2025130    131400   -9.0600 -137.2900      12.8       112       112        60
OIR    2025130    131400   -9.0600 -137.3000      12.9       115       110        60
OIR    2025130    131400   -9.0600 -137.3100      13.3       116       105        60
OIR    2025130    131400   -9.0600 -137.3200      14.7       117       103        60
OIR    2025130    131400   -9.0600 -137.3300      15.4       116       103        60
OIR    2025130    131400   -9.0600 -137.3400      15.9       115       103        60
OIR    2025130    131400   -9.0600 -137.3500      16.1       113       103        60
OIR    2025130    131400   -9.0600 -137.3600      16.2       110       103        60
OIR    2025130    131400   -9.0600 -137.3700      16.1       109       103        60
OIR    2025130    131400   -9.0600 -137.3800      16.1       111       103        60
OIR    2025130    131400   -9.0600 -137.3900      16.3       115       103        60
OIR    2025130    131400   -9.0600 -137.4000      16.9       121       103        60
OIR    2025130    131400   -9.0600 -137.4100      17.3       124       103        60
OIR    2025130    131400   -9.0600 -137.4200      17.5       125       103        60
OIR    2025130    131400   -9.0600 -137.4300      17.5       125       103        60
OIR    2025130    131400   -9.0600 -137.4400      17.5       126       103        60
OIR    2025130    131400   -9.0600 -137.4500      17.4       126       103        60
OIR    2025130    131400   -9.0600 -137.4600      17.3       126       103        60
OIR    2025130    131400   -9.0600 -137.4700      16.9       126       104        60
OIR    2025130    131400   -9.0600 -137.4800      16.4       124       104        60
OIR    2025130    131400   -9.0600 -137.4900      15.9       115       105        60
OIR    2025130    131400   -9.0600 -137.5000      16.1       109       107        60
OIR    2025130    131400   -9.0600 -137.5100      15.2       106       104        60
OIR    2025130    131400   -9.0600 -137.5200      16.2        97       103        60
OIR    2025130    131400   -9.0600 -137.5300      15.3        86       103        60
OIR    2025130    131400   -9.0600 -137.5400      15.6        78       103        60
OIR    2025130    131400   -9.0600 -137.5500      16.3        68       103        60
OIR    2025130    131400   -9.0600 -137.5600      17.5        60       103        60
OIR    2025130    131400   -9.0600 -137.5700      18.2        56       103        60
OIR    2025130    131400   -9.0600 -137.5800      18.2        52       103        60
OIR    2025130    131400   -9.0600 -137.5900      17.8        50       103        60
OIR    2025130    131400   -9.0600 -137.6000      17.2        45       103        60
OIR    2025130    131400   -9.0600 -137.6100      13.3        17       103        60
OIR    2025130    131400   -9.0600 -137.6200      13.1        13       103        60
OIR    2025130    131400   -9.0600 -137.6300      12.8        10       103        60
OIR    2025130    131400   -9.0600 -137.6400      12.1         5       103        60
OIR    2025130    131400   -9.0600 -137.6500      10.9         0       103        60
OIR    2025130    131400   -9.0600 -137.6600      10.0       354       103        60
OIR    2025130    131400   -9.0600 -137.6700      10.1       344       103        60
OIR    2025130    131400   -9.0600 -137.6800      12.6       329       104        60
OIR    2025130    131400   -9.0600 -137.6900      13.8       331       112        60
OIR    2025130    131400   -9.0600 -137.7000      13.2         4       120        60
OIR    2025130    131400   -9.0600 -137.7100      12.7         7       120        60
OIR    2025130    131400   -9.0600 -137.7200      14.1        14       116        60
OIR    2025130    131400   -9.0600 -137.7300      14.5        10       110        60
OIR    2025130    131400   -9.0600 -137.7400      12.6       337       115        60
OIR    2025130    131400   -9.0600 -137.7500       5.5       307       130        60
OIR    2025130    131400   -9.0600 -137.7600       5.7       284       139        60
OIR    2025130    131400   -9.0600 -137.7700       4.6       266       147        60
OIR    2025130    131400   -9.0600 -137.8100       5.5       203       147        60
OIR    2025130    131400   -9.0600 -138.1500      18.8         7       143        60
OIR    2025130    131400   -9.0600 -138.1600      20.3        32       130        60
OIR    2025130    131400   -9.0600 -138.1700      21.1        38       123        60
OIR    2025130    131400   -9.0600 -138.1800      20.9        38       115        60
OIR    2025130    131400   -9.0600 -138.1900      19.8        35       105        60
OIR    2025130    131400   -9.0600 -138.2000      19.5        34       104        60
OIR    2025130    131400   -9.0600 -138.2100      19.4        33       103        60
OIR    2025130    131400   -9.0600 -138.2200      19.3        32       103        60
OIR    2025130    131400   -9.0600 -138.2300      19.3        31       103        60
OIR    2025130    131400   -9.0600 -138.2400      19.2        29       103        60
OIR    2025130    131400   -9.0600 -138.2500      19.2        26       103        60
OIR    2025130    131400   -9.0600 -138.2600      19.4        22       103        60
OIR    2025130    131400   -9.0600 -138.2700      19.7        19       103        60
OIR    2025130    131400   -9.0600 -138.2800      19.9        17       103        60
OIR    2025130    131400   -9.0600 -138.2900      20.3        15       103        60
OIR    2025130    131400   -9.0600 -138.3000      20.7        14       103        60
OIR    2025130    131400   -9.0600 -138.3100      21.2        11       103        60
OIR    2025130    131400   -9.0600 -138.3200      22.0         7       103        60
OIR    2025130    131400   -9.0600 -138.3300      23.5         2       103        60
OIR    2025130    131400   -9.0600 -138.3400      24.9       359       103        60
OIR    2025130    131400   -9.0600 -138.3500      25.3       358       103        60
OIR    2025130    131400   -9.0600 -138.3600      25.4       358       103        60
OIR    2025130    131400   -9.0600 -138.3700      25.4       358       103        60
OIR    2025130    131400   -9.0600 -138.3800      25.5       358       103        60
OIR    2025130    131400   -9.0600 -138.3900      25.6       358       103        60
OIR    2025130    131400   -9.0600 -138.4000      25.6       357       103        60
OIR    2025130    131400   -9.0600 -138.4100      25.7       357       103        60
OIR    2025130    131400   -9.0600 -138.4200      25.8       357       103        60
OIR    2025130    131400   -9.0600 -138.4300      26.0       357       103        60
OIR    2025130    131400   -9.0600 -138.4400      26.1       357       103        60
OIR    2025130    131400   -9.0600 -138.4500      26.3       357       103        60
OIR    2025130    131400   -9.0600 -138.4600      26.4       357       103        60
OIR    2025130    131400   -9.0600 -138.4700      26.4       357       103        60
OIR    2025130    131400   -9.0600 -138.4800      26.4       357       103        60
OIR    2025130    131400   -9.0600 -138.4900      26.4       357       103        60
OIR    2025130    131400   -9.0600 -138.5000      26.3       358       103        60
OIR    2025130    131400   -9.0600 -138.5100      26.2       358       103        60
OIR    2025130    131400   -9.0600 -138.5200      26.2       358       103        60
OIR    2025130    131400   -9.0600 -138.5300      26.1       358       103        60
OIR    2025130    131400   -9.0600 -138.5400      26.1       358       103        60
OIR    2025130    131400   -9.0600 -138.5500      26.1       358       103        60
OIR    2025130    131400   -9.0600 -138.5600      26.1       358       104        60
OIR    2025130    131400   -9.0600 -138.5700      26.1       358       107        60
OIR    2025130    131400   -9.0600 -138.5800      26.0       358       109        60
OIR    2025130    131400   -9.0600 -138.5900      25.9       357       109        60
OIR    2025130    131400   -9.0600 -138.6000      25.7       356       108        60
OIR    2025130    131400   -9.0600 -138.6100      25.6       356       105        60
OIR    2025130    131400   -9.0600 -138.6200      25.5       355       105        60
OIR    2025130    131400   -9.0600 -138.6300      25.5       355       108        60
OIR    2025130    131400   -9.0600 -138.6400      25.4       355       107        60
OIR    2025130    131400   -9.0600 -138.6500      25.2       355       107        60
OIR    2025130    131400   -9.0600 -138.6600      24.8       354       108        60
OIR    2025130    131400   -9.0600 -138.6700      24.4       354       109        60
OIR    2025130    131400   -9.0600 -138.6800      23.8       353       107        60
OIR    2025130    131400   -9.0600 -138.6900      23.1       351       107        60
OIR    2025130    131400   -9.0600 -138.7000      22.4       350       109        60
OIR    2025130    131400   -9.0600 -138.7100      21.5       347       108        60
OIR    2025130    131400   -9.0600 -138.7200      20.5       345       107        60
OIR    2025130    131400   -9.0600 -138.7300      19.2       343       107        60
OIR    2025130    131400   -9.0600 -138.7400      18.0       340       108        60
OIR    2025130    131400   -9.0600 -138.7500      17.4       339       110        60
OIR    2025130    131400   -9.0600 -138.7600      17.2       339       112        60
OIR    2025130    131400   -9.0600 -138.7700      17.0       338       112        60
OIR    2025130    131400   -9.0600 -138.7800      16.8       338       112        60
OIR    2025130    131400   -9.0600 -138.7900      16.6       337       111        60
OIR    2025130    131400   -9.0600 -138.8000      16.4       337       112        60
OIR    2025130    131400   -9.0600 -138.8100      16.1       335       114        60
OIR    2025130    131400   -9.0600 -138.8200      15.8       333       116        60
OIR    2025130    131400   -9.0600 -138.8300      15.5       331       117        60
OIR    2025130    131400   -9.0600 -138.8400      15.2       329       117        60
OIR    2025130    131400   -9.0600 -138.8500      14.9       328       117        60
OIR    2025130    131400   -9.0600 -138.8600      14.7       326       122        60
OIR    2025130    131400   -9.0600 -138.8700      14.4       324       124        60
OIR    2025130    131400   -9.0600 -138.8800      14.3       322       124        60
OIR    2025130    131400   -9.0600 -138.8900      14.2       319       125        60
OIR    2025130    131400   -9.0600 -138.9000      14.2       316       127        60
OIR    2025130    131400   -9.0600 -138.9100      14.4       311       130        60
OIR    2025130    131400   -9.0600 -138.9200      14.3       310       132        60
OIR    2025130    131400   -9.0600 -138.9300      14.4       308       132        60
OIR    2025130    131400   -9.0600 -138.9400      14.1       307       133        60
OIR    2025130    131400   -9.0600 -138.9500      14.0       305       144        60
OIR    2025130    131400   -9.0700 -136.4400      36.6       108       140        60
OIR    2025130    131400   -9.0700 -136.4500      36.6       108       142        60
OIR    2025130    131400   -9.0700 -136.4600      36.6       108       140        60
OIR    2025130    131400   -9.0700 -136.4700      36.6       108       134        60
OIR    2025130    131400   -9.0700 -136.4800      36.6       108       133        60
OIR    2025130    131400   -9.0700 -136.4900      36.6       108       132        60
OIR    2025130    131400   -9.0700 -136.5000      36.6       108       132        60
OIR    2025130    131400   -9.0700 -136.5100      36.6       108       132        60
OIR    2025130    131400   -9.0700 -136.5200      36.7       108       131        60
OIR    2025130    131400   -9.0700 -136.5300      36.7       108       132        60
OIR    2025130    131400   -9.0700 -136.5400      36.6       108       134        60
OIR    2025130    131400   -9.0700 -136.5500      36.6       108       136        60
OIR    2025130    131400   -9.0700 -136.5600      36.5       108       137        60
OIR    2025130    131400   -9.0700 -136.5700      36.1       109       138        60
OIR    2025130    131400   -9.0700 -136.5800      36.0       109       140        60
OIR    2025130    131400   -9.0700 -136.5900      35.7       108       140        60
OIR    2025130    131400   -9.0700 -136.6000      34.6       107       140        60
OIR    2025130    131400   -9.0700 -136.6100      33.7       106       139        60
OIR    2025130    131400   -9.0700 -136.6200      32.9       105       138        60
OIR    2025130    131400   -9.0700 -136.6300      32.3       104       137        60
OIR    2025130    131400   -9.0700 -136.6400      31.9       104       137        60
OIR    2025130    131400   -9.0700 -136.6500      31.8       103       136        60
OIR    2025130    131400   -9.0700 -136.6600      31.8       103       135        60
OIR    2025130    131400   -9.0700 -136.6700      31.8       103       131        60
OIR    2025130    131400   -9.0700 -136.6800      31.8       103       133        60
OIR    2025130    131400   -9.0700 -136.6900      32.0       103       138        60
OIR    2025130    131400   -9.0700 -136.7000      31.9       102       137        60
OIR    2025130    131400   -9.0700 -136.7100      31.6       101       137        60
OIR    2025130    131400   -9.0700 -136.7200      31.2       101       132        60
OIR    2025130    131400   -9.0700 -136.7300      31.0       101       127        60
OIR    2025130    131400   -9.0700 -136.7400      30.5        99       124        60
OIR    2025130    131400   -9.0700 -136.7500      29.8        97       122        60
OIR    2025130    131400   -9.0700 -136.7600      29.0        96       122        60
OIR    2025130    131400   -9.0700 -136.7700      28.6        95       121        60
OIR    2025130    131400   -9.0700 -136.7800      28.2        94       121        60
OIR    2025130    131400   -9.0700 -136.7900      27.8        94       122        60
OIR    2025130    131400   -9.0700 -136.8000      27.4        93       123        60
OIR    2025130    131400   -9.0700 -136.8100      26.5        93       125        60
OIR    2025130    131400   -9.0700 -136.8200      25.8        92       127        60
OIR    2025130    131400   -9.0700 -136.8300      24.2        91       126        60
OIR    2025130    131400   -9.0700 -136.8400      23.0        90       125        60
OIR    2025130    131400   -9.0700 -136.8500      21.9        89       126        60
OIR    2025130    131400   -9.0700 -136.8600      21.2        88       126        60
OIR    2025130    131400   -9.0700 -136.8700      20.7        89       127        60
OIR    2025130    131400   -9.0700 -136.8800      19.6        90       128        60
OIR    2025130    131400   -9.0700 -136.8900      18.4        92       129        60
OIR    2025130    131400   -9.0700 -136.9000      17.8        93       129        60
OIR    2025130    131400   -9.0700 -136.9100      17.3        95       128        60
OIR    2025130    131400   -9.0700 -136.9200      16.9        97       126        60
OIR    2025130    131400   -9.0700 -136.9300      16.8        98       125        60
OIR    2025130    131400   -9.0700 -136.9400      16.8        98       122        60
OIR    2025130    131400   -9.0700 -136.9500      17.0        99       120        60
OIR    2025130    131400   -9.0700 -136.9600      17.2        99       120        60
OIR    2025130    131400   -9.0700 -136.9700      17.4        99       119        60
OIR    2025130    131400   -9.0700 -136.9800      17.6        99       119        60
OIR    2025130    131400   -9.0700 -136.9900      17.9        99       117        60
OIR    2025130    131400   -9.0700 -137.0000      18.1        99       116        60
OIR    2025130    131400   -9.0700 -137.0100      18.3        99       115        60
OIR    2025130    131400   -9.0700 -137.0200      18.4       100       114        60
OIR    2025130    131400   -9.0700 -137.0300      18.4       100       114        60
OIR    2025130    131400   -9.0700 -137.0400      18.4       100       115        60
OIR    2025130    131400   -9.0700 -137.0500      18.5       100       116        60
OIR    2025130    131400   -9.0700 -137.0600      18.5       100       116        60
OIR    2025130    131400   -9.0700 -137.0700      18.5       100       116        60
OIR    2025130    131400   -9.0700 -137.0800      18.5       100       116        60
OIR    2025130    131400   -9.0700 -137.0900      18.6       100       115        60
OIR    2025130    131400   -9.0700 -137.1000      18.7       100       114        60
OIR    2025130    131400   -9.0700 -137.1100      18.7       101       113        60
OIR    2025130    131400   -9.0700 -137.1200      18.7       101       113        60
OIR    2025130    131400   -9.0700 -137.1300      18.7       101       113        60
OIR    2025130    131400   -9.0700 -137.1400      18.7       101       116        60
OIR    2025130    131400   -9.0700 -137.1500      18.7       102       119        60
OIR    2025130    131400   -9.0700 -137.1600      18.6       102       119        60
OIR    2025130    131400   -9.0700 -137.1700      18.5       102       119        60
OIR    2025130    131400   -9.0700 -137.1800      18.4       102       119        60
OIR    2025130    131400   -9.0700 -137.1900      18.1       103       119        60
OIR    2025130    131400   -9.0700 -137.2000      17.8       103       119        60
OIR    2025130    131400   -9.0700 -137.2100      17.4       103       117        60
OIR    2025130    131400   -9.0700 -137.2200      16.9       104       116        60
OIR    2025130    131400   -9.0700 -137.2300      16.4       104       116        60
OIR    2025130    131400   -9.0700 -137.2400      15.9       104       116        60
OIR    2025130    131400   -9.0700 -137.2500      15.4       105       115        60
OIR    2025130    131400   -9.0700 -137.2600      14.9       105       113        60
OIR    2025130    131400   -9.0700 -137.2700      14.3       105       112        60
OIR    2025130    131400   -9.0700 -137.2800      13.3       105       111        60
OIR    2025130    131400   -9.0700 -137.2900      12.1       106       110        60
OIR    2025130    131400   -9.0700 -137.3000      11.9       108       108        60
OIR    2025130    131400   -9.0700 -137.3100      11.9       108       104        60
OIR    2025130    131400   -9.0700 -137.3200      13.2       108       103        60
OIR    2025130    131400   -9.0700 -137.3300      14.3       107       103        60
OIR    2025130    131400   -9.0700 -137.3400      15.1       105       103        60
OIR    2025130    131400   -9.0700 -137.3500      15.2       102       103        60
OIR    2025130    131400   -9.0700 -137.3600      15.8       100       103        60
OIR    2025130    131400   -9.0700 -137.3700      15.9        99       103        60
OIR    2025130    131400   -9.0700 -137.3800      15.7       100       103        60
OIR    2025130    131400   -9.0700 -137.3900      15.6       102       103        60
OIR    2025130    131400   -9.0700 -137.4000      15.8       107       103        60
OIR    2025130    131400   -9.0700 -137.4100      16.4       116       103        60
OIR    2025130    131400   -9.0700 -137.4200      16.9       122       103        60
OIR    2025130    131400   -9.0700 -137.4300      17.2       124       103        60
OIR    2025130    131400   -9.0700 -137.4400      17.2       125       103        60
OIR    2025130    131400   -9.0700 -137.4500      16.9       125       103        60
OIR    2025130    131400   -9.0700 -137.4600      16.2       125       103        60
OIR    2025130    131400   -9.0700 -137.4700      15.3       125       103        60
OIR    2025130    131400   -9.0700 -137.4800      14.1       122       103        60
OIR    2025130    131400   -9.0700 -137.4900      13.9       113       104        60
OIR    2025130    131400   -9.0700 -137.5000      14.8       106       104        60
OIR    2025130    131400   -9.0700 -137.5100      13.6       103       104        60
OIR    2025130    131400   -9.0700 -137.5200      15.2        92       103        60
OIR    2025130    131400   -9.0700 -137.5300      15.9        80       103        60
OIR    2025130    131400   -9.0700 -137.5400      15.6        67       103        60
OIR    2025130    131400   -9.0700 -137.5500      16.4        54       103        60
OIR    2025130    131400   -9.0700 -137.5600      17.6        49       103        60
OIR    2025130    131400   -9.0700 -137.5700      18.4        47       103        60
OIR    2025130    131400   -9.0700 -137.5800      18.6        45       103        60
OIR    2025130    131400   -9.0700 -137.5900      18.0        43       103        60
OIR    2025130    131400   -9.0700 -137.6000      17.2        38       103        60
OIR    2025130    131400   -9.0700 -137.6100      14.5        13       103        60
OIR    2025130    131400   -9.0700 -137.6200      14.4        11       103        60
OIR    2025130    131400   -9.0700 -137.6300      14.4         8       103        60
OIR    2025130    131400   -9.0700 -137.6400      14.0         6       103        60
OIR    2025130    131400   -9.0700 -137.6500      13.2         3       103        60
OIR    2025130    131400   -9.0700 -137.6600      12.6       358       103        60
OIR    2025130    131400   -9.0700 -137.6700      13.0       348       103        60
OIR    2025130    131400   -9.0700 -137.6800      15.8       334       104        60
OIR    2025130    131400   -9.0700 -137.6900      16.8       334       114        60
OIR    2025130    131400   -9.0700 -137.7000      16.7       349       123        60
OIR    2025130    131400   -9.0700 -137.7100      16.7       360       127        60
OIR    2025130    131400   -9.0700 -137.7200      16.4       359       129        60
OIR    2025130    131400   -9.0700 -137.7300      17.5       348       125        60
OIR    2025130    131400   -9.0700 -137.7400      13.3       332       128        60
OIR    2025130    131400   -9.0700 -137.7500       8.6       310       136        60
OIR    2025130    131400   -9.0700 -137.7600       8.1       306       139        60
OIR    2025130    131400   -9.0700 -137.8000       4.0       210       136        60
OIR    2025130    131400   -9.0700 -137.8100       4.8       210       142        60
OIR    2025130    131400   -9.0700 -138.1600      19.3        19       142        60
OIR    2025130    131400   -9.0700 -138.1700      21.5        37       128        60
OIR    2025130    131400   -9.0700 -138.1800      21.1        37       116        60
OIR    2025130    131400   -9.0700 -138.1900      20.1        34       105        60
OIR    2025130    131400   -9.0700 -138.2000      20.0        33       104        60
OIR    2025130    131400   -9.0700 -138.2100      20.0        33       103        60
OIR    2025130    131400   -9.0700 -138.2200      19.9        32       103        60
OIR    2025130    131400   -9.0700 -138.2300      19.9        31       103        60
OIR    2025130    131400   -9.0700 -138.2400      19.9        30       103        60
OIR    2025130    131400   -9.0700 -138.2500      19.8        27       103        60
OIR    2025130    131400   -9.0700 -138.2600      19.9        23       103        60
OIR    2025130    131400   -9.0700 -138.2700      20.1        20       103        60
OIR    2025130    131400   -9.0700 -138.2800      20.3        17       103        60
OIR    2025130    131400   -9.0700 -138.2900      20.6        15       103        60
OIR    2025130    131400   -9.0700 -138.3000      20.9        14       103        60
OIR    2025130    131400   -9.0700 -138.3100      21.6        11       103        60
OIR    2025130    131400   -9.0700 -138.3200      22.5         6       103        60
OIR    2025130    131400   -9.0700 -138.3300      24.0         2       103        60
OIR    2025130    131400   -9.0700 -138.3400      25.2       359       103        60
OIR    2025130    131400   -9.0700 -138.3500      25.4       358       103        60
OIR    2025130    131400   -9.0700 -138.3600      25.5       358       103        60
OIR    2025130    131400   -9.0700 -138.3700      25.6       358       103        60
OIR    2025130    131400   -9.0700 -138.3800      25.7       358       103        60
OIR    2025130    131400   -9.0700 -138.3900      25.8       358       103        60
OIR    2025130    131400   -9.0700 -138.4000      25.9       357       103        60
OIR    2025130    131400   -9.0700 -138.4100      26.0       357       103        60
OIR    2025130    131400   -9.0700 -138.4200      26.1       357       103        60
OIR    2025130    131400   -9.0700 -138.4300      26.2       357       103        60
OIR    2025130    131400   -9.0700 -138.4400      26.3       357       103        60
OIR    2025130    131400   -9.0700 -138.4500      26.4       357       103        60
OIR    2025130    131400   -9.0700 -138.4600      26.5       357       103        60
OIR    2025130    131400   -9.0700 -138.4700      26.5       357       103        60
OIR    2025130    131400   -9.0700 -138.4800      26.5       357       103        60
OIR    2025130    131400   -9.0700 -138.4900      26.5       357       103        60
OIR    2025130    131400   -9.0700 -138.5000      26.5       357       103        60
OIR    2025130    131400   -9.0700 -138.5100      26.4       358       103        60
OIR    2025130    131400   -9.0700 -138.5200      26.3       358       103        60
OIR    2025130    131400   -9.0700 -138.5300      26.2       358       103        60
OIR    2025130    131400   -9.0700 -138.5400      26.2       358       103        60
OIR    2025130    131400   -9.0700 -138.5500      26.2       358       103        60
OIR    2025130    131400   -9.0700 -138.5600      26.2       358       103        60
OIR    2025130    131400   -9.0700 -138.5700      26.2       358       104        60
OIR    2025130    131400   -9.0700 -138.5800      26.1       358       107        60
OIR    2025130    131400   -9.0700 -138.5900      25.9       357       108        60
OIR    2025130    131400   -9.0700 -138.6000      25.8       356       108        60
OIR    2025130    131400   -9.0700 -138.6100      25.6       356       108        60
OIR    2025130    131400   -9.0700 -138.6200      25.6       355       109        60
OIR    2025130    131400   -9.0700 -138.6300      25.5       355       109        60
OIR    2025130    131400   -9.0700 -138.6400      25.4       355       108        60
OIR    2025130    131400   -9.0700 -138.6500      25.3       355       107        60
OIR    2025130    131400   -9.0700 -138.6600      25.0       355       107        60
OIR    2025130    131400   -9.0700 -138.6700      24.6       354       107        60
OIR    2025130    131400   -9.0700 -138.6800      24.0       353       108        60
OIR    2025130    131400   -9.0700 -138.6900      23.4       352       108        60
OIR    2025130    131400   -9.0700 -138.7000      22.7       350       108        60
OIR    2025130    131400   -9.0700 -138.7100      21.8       348       108        60
OIR    2025130    131400   -9.0700 -138.7200      20.9       346       108        60
OIR    2025130    131400   -9.0700 -138.7300      19.6       344       108        60
OIR    2025130    131400   -9.0700 -138.7400      18.3       341       108        60
OIR    2025130    131400   -9.0700 -138.7500      17.5       339       111        60
OIR    2025130    131400   -9.0700 -138.7600      17.3       339       113        60
OIR    2025130    131400   -9.0700 -138.7700      17.1       338       112        60
OIR    2025130    131400   -9.0700 -138.7800      16.8       338       111        60
OIR    2025130    131400   -9.0700 -138.7900      16.6       337       112        60
OIR    2025130    131400   -9.0700 -138.8000      16.4       336       113        60
OIR    2025130    131400   -9.0700 -138.8100      16.1       334       114        60
OIR    2025130    131400   -9.0700 -138.8200      15.8       333       116        60
OIR    2025130    131400   -9.0700 -138.8300      15.5       331       117        60
OIR    2025130    131400   -9.0700 -138.8400      15.2       329       119        60
OIR    2025130    131400   -9.0700 -138.8500      14.9       327       120        60
OIR    2025130    131400   -9.0700 -138.8600      14.7       325       122        60
OIR    2025130    131400   -9.0700 -138.8700      14.5       323       124        60
OIR    2025130    131400   -9.0700 -138.8800      14.4       320       124        60
OIR    2025130    131400   -9.0700 -138.8900      14.4       318       125        60
OIR    2025130    131400   -9.0700 -138.9000      14.4       315       128        60
OIR    2025130    131400   -9.0700 -138.9100      14.5       311       131        60
OIR    2025130    131400   -9.0700 -138.9200      14.5       310       133        60
OIR    2025130    131400   -9.0700 -138.9300      14.6       308       134        60
OIR    2025130    131400   -9.0700 -138.9400      14.6       307       135        60
OIR    2025130    131400   -9.0700 -138.9500      14.5       306       142        60
OIR    2025130    131400   -9.0800 -136.4700      36.6       108       138        60
OIR    2025130    131400   -9.0800 -136.4800      36.6       108       136        60
OIR    2025130    131400   -9.0800 -136.4900      36.6       108       135        60
OIR    2025130    131400   -9.0800 -136.5000      36.7       108       133        60
OIR    2025130    131400   -9.0800 -136.5100      36.7       108       132        60
OIR    2025130    131400   -9.0800 -136.5200      36.7       108       131        60
OIR    2025130    131400   -9.0800 -136.5300      36.7       108       132        60
OIR    2025130    131400   -9.0800 -136.5400      36.7       108       137        60
OIR    2025130    131400   -9.0800 -136.5500      36.7       108       141        60
OIR    2025130    131400   -9.0800 -136.5600      36.6       108       142        60
OIR    2025130    131400   -9.0800 -136.6000      34.0       106       141        60
OIR    2025130    131400   -9.0800 -136.6100      33.3       105       138        60
OIR    2025130    131400   -9.0800 -136.6200      32.5       104       137        60
OIR    2025130    131400   -9.0800 -136.6300      32.0       104       137        60
OIR    2025130    131400   -9.0800 -136.6400      31.8       103       136        60
OIR    2025130    131400   -9.0800 -136.6500      31.8       103       134        60
OIR    2025130    131400   -9.0800 -136.6600      31.8       103       132        60
OIR    2025130    131400   -9.0800 -136.6700      31.8       103       130        60
OIR    2025130    131400   -9.0800 -136.6800      31.9       103       132        60
OIR    2025130    131400   -9.0800 -136.6900      31.9       102       137        60
OIR    2025130    131400   -9.0800 -136.7000      31.7       101       135        60
OIR    2025130    131400   -9.0800 -136.7100      31.4       100       133        60
OIR    2025130    131400   -9.0800 -136.7200      31.3       100       129        60
OIR    2025130    131400   -9.0800 -136.7300      30.7        98       125        60
OIR    2025130    131400   -9.0800 -136.7400      30.3        96       123        60
OIR    2025130    131400   -9.0800 -136.7500      29.6        93       123        60
OIR    2025130    131400   -9.0800 -136.7600      29.1        92       122        60
OIR    2025130    131400   -9.0800 -136.7700      28.9        91       122        60
OIR    2025130    131400   -9.0800 -136.7800      28.6        91       121        60
OIR    2025130    131400   -9.0800 -136.7900      28.3        91       121        60
OIR    2025130    131400   -9.0800 -136.8000      27.9        91       121        60
OIR    2025130    131400   -9.0800 -136.8100      27.1        91       124        60
OIR    2025130    131400   -9.0800 -136.8200      26.3        90       126        60
OIR    2025130    131400   -9.0800 -136.8300      24.5        88       125        60
OIR    2025130    131400   -9.0800 -136.8400      23.7        87       124        60
OIR    2025130    131400   -9.0800 -136.8500      22.8        86       124        60
OIR    2025130    131400   -9.0800 -136.8600      22.3        85       124        60
OIR    2025130    131400   -9.0800 -136.8700      22.0        85       125        60
OIR    2025130    131400   -9.0800 -136.8800      21.3        85       125        60
OIR    2025130    131400   -9.0800 -136.8900      20.6        86       127        60
OIR    2025130    131400   -9.0800 -136.9000      20.6        86       128        60
OIR    2025130    131400   -9.0800 -136.9100      20.0        87       129        60
OIR    2025130    131400   -9.0800 -136.9200      19.0        89       128        60
OIR    2025130    131400   -9.0800 -136.9300      18.4        91       127        60
OIR    2025130    131400   -9.0800 -136.9400      18.3        92       123        60
OIR    2025130    131400   -9.0800 -136.9500      18.1        94       120        60
OIR    2025130    131400   -9.0800 -136.9600      18.0        95       120        60
OIR    2025130    131400   -9.0800 -136.9700      18.1        96       119        60
OIR    2025130    131400   -9.0800 -136.9800      18.3        97       117        60
OIR    2025130    131400   -9.0800 -136.9900      18.5        97       116        60
OIR    2025130    131400   -9.0800 -137.0000      18.7        97       115        60
OIR    2025130    131400   -9.0800 -137.0100      18.8        98       115        60
OIR    2025130    131400   -9.0800 -137.0200      18.9        98       115        60
OIR    2025130    131400   -9.0800 -137.0300      18.8        99       115        60
OIR    2025130    131400   -9.0800 -137.0400      18.8        99       116        60
OIR    2025130    131400   -9.0800 -137.0500      18.7       100       116        60
OIR    2025130    131400   -9.0800 -137.0600      18.7       100       116        60
OIR    2025130    131400   -9.0800 -137.0700      18.7       100       116        60
OIR    2025130    131400   -9.0800 -137.0800      18.7       100       115        60
OIR    2025130    131400   -9.0800 -137.0900      18.7       100       114        60
OIR    2025130    131400   -9.0800 -137.1000      18.8       100       113        60
OIR    2025130    131400   -9.0800 -137.1100      18.8       100       112        60
OIR    2025130    131400   -9.0800 -137.1200      18.8       100       112        60
OIR    2025130    131400   -9.0800 -137.1300      18.8       100       113        60
OIR    2025130    131400   -9.0800 -137.1400      18.8       100       115        60
OIR    2025130    131400   -9.0800 -137.1500      18.8       101       116        60
OIR    2025130    131400   -9.0800 -137.1600      18.7       101       117        60
OIR    2025130    131400   -9.0800 -137.1700      18.6       101       117        60
OIR    2025130    131400   -9.0800 -137.1800      18.4       101       116        60
OIR    2025130    131400   -9.0800 -137.1900      18.2       102       117        60
OIR    2025130    131400   -9.0800 -137.2000      17.9       102       119        60
OIR    2025130    131400   -9.0800 -137.2100      17.5       102       117        60
OIR    2025130    131400   -9.0800 -137.2200      17.1       101       115        60
OIR    2025130    131400   -9.0800 -137.2300      16.6       101       115        60
OIR    2025130    131400   -9.0800 -137.2400      16.1       100       116        60
OIR    2025130    131400   -9.0800 -137.2500      15.6        99       115        60
OIR    2025130    131400   -9.0800 -137.2600      15.1        98       113        60
OIR    2025130    131400   -9.0800 -137.2700      14.7        97       113        60
OIR    2025130    131400   -9.0800 -137.2800      14.0        97       113        60
OIR    2025130    131400   -9.0800 -137.2900      12.0        97       108        60
OIR    2025130    131400   -9.0800 -137.3000      11.7        97       104        60
OIR    2025130    131400   -9.0800 -137.3100      11.3        95       104        60
OIR    2025130    131400   -9.0800 -137.3200      12.2        92       103        60
OIR    2025130    131400   -9.0800 -137.3300      13.4        91       103        60
OIR    2025130    131400   -9.0800 -137.3400      14.3        88       103        60
OIR    2025130    131400   -9.0800 -137.3500      15.0        88       103        60
OIR    2025130    131400   -9.0800 -137.3600      15.5        90       103        60
OIR    2025130    131400   -9.0800 -137.3700      15.8        90       103        60
OIR    2025130    131400   -9.0800 -137.3800      15.7        91       103        60
OIR    2025130    131400   -9.0800 -137.3900      15.5        91       103        60
OIR    2025130    131400   -9.0800 -137.4000      15.3        91       103        60
OIR    2025130    131400   -9.0800 -137.4100      15.3        91       103        60
OIR    2025130    131400   -9.0800 -137.4200      15.3        93       103        60
OIR    2025130    131400   -9.0800 -137.4300      15.0        99       103        60
OIR    2025130    131400   -9.0800 -137.4400      14.9       105       103        60
OIR    2025130    131400   -9.0800 -137.4500      14.6       110       103        60
OIR    2025130    131400   -9.0800 -137.4600      13.7       115       103        60
OIR    2025130    131400   -9.0800 -137.4700      12.5       117       103        60
OIR    2025130    131400   -9.0800 -137.4800      11.5       116       103        60
OIR    2025130    131400   -9.0800 -137.4900      11.7       110       103        60
OIR    2025130    131400   -9.0800 -137.5000      13.1       101       103        60
OIR    2025130    131400   -9.0800 -137.5100      11.9        96       103        60
OIR    2025130    131400   -9.0800 -137.5200      13.7        83       103        60
OIR    2025130    131400   -9.0800 -137.5300      15.0        67       103        60
OIR    2025130    131400   -9.0800 -137.5400      15.4        52       103        60
OIR    2025130    131400   -9.0800 -137.5500      16.4        44       103        60
OIR    2025130    131400   -9.0800 -137.5600      17.3        43       103        60
OIR    2025130    131400   -9.0800 -137.5700      18.1        42       103        60
OIR    2025130    131400   -9.0800 -137.5800      18.5        40       103        60
OIR    2025130    131400   -9.0800 -137.5900      18.0        37       103        60
OIR    2025130    131400   -9.0800 -137.6000      17.0        28       103        60
OIR    2025130    131400   -9.0800 -137.6100      15.5        12       103        60
OIR    2025130    131400   -9.0800 -137.6200      15.4        10       103        60
OIR    2025130    131400   -9.0800 -137.6300      15.2         8       103        60
OIR    2025130    131400   -9.0800 -137.6400      15.0         7       103        60
OIR    2025130    131400   -9.0800 -137.6500      14.7         4       103        60
OIR    2025130    131400   -9.0800 -137.6600      14.5         1       103        60
OIR    2025130    131400   -9.0800 -137.6700      14.8       351       103        60
OIR    2025130    131400   -9.0800 -137.6800      17.6       336       104        60
OIR    2025130    131400   -9.0800 -137.6900      18.2       336       116        60
OIR    2025130    131400   -9.0800 -137.7000      18.3       340       126        60
OIR    2025130    131400   -9.0800 -137.7100      18.2       346       135        60
OIR    2025130    131400   -9.0800 -137.7200      18.3       346       141        60
OIR    2025130    131400   -9.0800 -137.7300      18.0       342       139        60
OIR    2025130    131400   -9.0800 -137.7400      14.6       333       139        60
OIR    2025130    131400   -9.0800 -137.7500      10.9       319       140        60
OIR    2025130    131400   -9.0800 -137.7600       7.9       310       139        60
OIR    2025130    131400   -9.0800 -137.8000       4.1       215       127        60
OIR    2025130    131400   -9.0800 -137.8100       4.6       210       137        60
OIR    2025130    131400   -9.0800 -137.8200       5.1       205       145        60
OIR    2025130    131400   -9.0800 -138.1700      21.1        35       132        60
OIR    2025130    131400   -9.0800 -138.1800      20.5        34       116        60
OIR    2025130    131400   -9.0800 -138.1900      20.2        33       105        60
OIR    2025130    131400   -9.0800 -138.2000      20.2        33       104        60
OIR    2025130    131400   -9.0800 -138.2100      20.2        33       103        60
OIR    2025130    131400   -9.0800 -138.2200      20.2        32       103        60
OIR    2025130    131400   -9.0800 -138.2300      20.3        31       103        60
OIR    2025130    131400   -9.0800 -138.2400      20.3        30       103        60
OIR    2025130    131400   -9.0800 -138.2500      20.3        28       103        60
OIR    2025130    131400   -9.0800 -138.2600      20.3        24       103        60
OIR    2025130    131400   -9.0800 -138.2700      20.5        21       103        60
OIR    2025130    131400   -9.0800 -138.2800      20.6        18       103        60
OIR    2025130    131400   -9.0800 -138.2900      20.8        16       103        60
OIR    2025130    131400   -9.0800 -138.3000      21.2        14       103        60
OIR    2025130    131400   -9.0800 -138.3100      21.9        11       103        60
OIR    2025130    131400   -9.0800 -138.3200      23.0         6       103        60
OIR    2025130    131400   -9.0800 -138.3300      24.5         1       103        60
OIR    2025130    131400   -9.0800 -138.3400      25.4       359       103        60
OIR    2025130    131400   -9.0800 -138.3500      25.6       358       103        60
OIR    2025130    131400   -9.0800 -138.3600      25.7       358       103        60
OIR    2025130    131400   -9.0800 -138.3700      25.8       358       103        60
OIR    2025130    131400   -9.0800 -138.3800      25.9       358       103        60
OIR    2025130    131400   -9.0800 -138.3900      25.9       358       103        60
OIR    2025130    131400   -9.0800 -138.4000      26.0       357       103        60
OIR    2025130    131400   -9.0800 -138.4100      26.1       357       103        60
OIR    2025130    131400   -9.0800 -138.4200      26.2       357       103        60
OIR    2025130    131400   -9.0800 -138.4300      26.3       357       103        60
OIR    2025130    131400   -9.0800 -138.4400      26.4       357       103        60
OIR    2025130    131400   -9.0800 -138.4500      26.5       357       103        60
OIR    2025130    131400   -9.0800 -138.4600      26.6       357       103        60
OIR    2025130    131400   -9.0800 -138.4700      26.6       357       103        60
OIR    2025130    131400   -9.0800 -138.4800      26.7       357       103        60
OIR    2025130    131400   -9.0800 -138.4900      26.7       357       103        60
OIR    2025130    131400   -9.0800 -138.5000      26.7       357       103        60
OIR    2025130    131400   -9.0800 -138.5100      26.6       357       103        60
OIR    2025130    131400   -9.0800 -138.5200      26.5       358       103        60
OIR    2025130    131400   -9.0800 -138.5300      26.4       358       103        60
OIR    2025130    131400   -9.0800 -138.5400      26.3       358       103        60
OIR    2025130    131400   -9.0800 -138.5500      26.3       358       103        60
OIR    2025130    131400   -9.0800 -138.5600      26.3       358       103        60
OIR    2025130    131400   -9.0800 -138.5700      26.3       358       104        60
OIR    2025130    131400   -9.0800 -138.5800      26.2       357       104        60
OIR    2025130    131400   -9.0800 -138.5900      26.0       357       105        60
OIR    2025130    131400   -9.0800 -138.6000      25.8       356       108        60
OIR    2025130    131400   -9.0800 -138.6100      25.7       355       109        60
OIR    2025130    131400   -9.0800 -138.6200      25.6       355       110        60
OIR    2025130    131400   -9.0800 -138.6300      25.5       355       109        60
OIR    2025130    131400   -9.0800 -138.6400      25.5       355       108        60
OIR    2025130    131400   -9.0800 -138.6500      25.3       355       105        60
OIR    2025130    131400   -9.0800 -138.6600      25.1       355       105        60
OIR    2025130    131400   -9.0800 -138.6700      24.8       354       105        60
OIR    2025130    131400   -9.0800 -138.6800      24.2       353       108        60
OIR    2025130    131400   -9.0800 -138.6900      23.6       352       109        60
OIR    2025130    131400   -9.0800 -138.7000      22.9       350       108        60
OIR    2025130    131400   -9.0800 -138.7100      22.0       348       108        60
OIR    2025130    131400   -9.0800 -138.7200      21.2       346       108        60
OIR    2025130    131400   -9.0800 -138.7300      20.1       344       108        60
OIR    2025130    131400   -9.0800 -138.7400      18.7       342       108        60
OIR    2025130    131400   -9.0800 -138.7500      17.7       340       111        60
OIR    2025130    131400   -9.0800 -138.7600      17.4       339       113        60
OIR    2025130    131400   -9.0800 -138.7700      17.1       338       112        60
OIR    2025130    131400   -9.0800 -138.7800      16.9       337       111        60
OIR    2025130    131400   -9.0800 -138.7900      16.7       337       112        60
OIR    2025130    131400   -9.0800 -138.8000      16.5       336       114        60
OIR    2025130    131400   -9.0800 -138.8100      16.2       334       115        60
OIR    2025130    131400   -9.0800 -138.8200      15.8       332       116        60
OIR    2025130    131400   -9.0800 -138.8300      15.5       330       116        60
OIR    2025130    131400   -9.0800 -138.8400      15.2       328       119        60
OIR    2025130    131400   -9.0800 -138.8500      14.9       325       121        60
OIR    2025130    131400   -9.0800 -138.8600      14.7       324       123        60
OIR    2025130    131400   -9.0800 -138.8700      14.6       321       124        60
OIR    2025130    131400   -9.0800 -138.8800      14.5       319       124        60
OIR    2025130    131400   -9.0800 -138.8900      14.5       317       124        60
OIR    2025130    131400   -9.0800 -138.9000      14.6       315       128        60
OIR    2025130    131400   -9.0800 -138.9100      14.7       312       131        60
OIR    2025130    131400   -9.0800 -138.9200      14.7       310       133        60
OIR    2025130    131400   -9.0800 -138.9300      14.7       308       134        60
OIR    2025130    131400   -9.0800 -138.9400      14.8       307       136        60
OIR    2025130    131400   -9.0800 -138.9500      14.7       307       141        60
OIR    2025130    131400   -9.0800 -138.9600      13.4       308       145        60
OIR    2025130    131400   -9.0900 -136.4600      36.6       108       144        60
OIR    2025130    131400   -9.0900 -136.4700      36.6       108       140        60
OIR    2025130    131400   -9.0900 -136.4800      36.6       108       139        60
OIR    2025130    131400   -9.0900 -136.4900      36.7       108       138        60
OIR    2025130    131400   -9.0900 -136.5000      36.7       108       135        60
OIR    2025130    131400   -9.0900 -136.5100      36.7       108       132        60
OIR    2025130    131400   -9.0900 -136.5200      36.7       108       131        60
OIR    2025130    131400   -9.0900 -136.5300      36.7       108       133        60
OIR    2025130    131400   -9.0900 -136.5400      36.7       108       137        60
OIR    2025130    131400   -9.0900 -136.5500      36.8       108       140        60
OIR    2025130    131400   -9.0900 -136.5600      36.6       108       140        60
OIR    2025130    131400   -9.0900 -136.5700      36.0       107       141        60
OIR    2025130    131400   -9.0900 -136.5800      35.4       106       142        60
OIR    2025130    131400   -9.0900 -136.5900      34.7       106       141        60
OIR    2025130    131400   -9.0900 -136.6000      33.8       105       139        60
OIR    2025130    131400   -9.0900 -136.6100      33.0       105       137        60
OIR    2025130    131400   -9.0900 -136.6200      32.3       104       135        60
OIR    2025130    131400   -9.0900 -136.6300      31.9       103       135        60
OIR    2025130    131400   -9.0900 -136.6400      31.8       103       134        60
OIR    2025130    131400   -9.0900 -136.6500      31.7       103       133        60
OIR    2025130    131400   -9.0900 -136.6600      31.7       102       132        60
OIR    2025130    131400   -9.0900 -136.6700      31.7       102       131        60
OIR    2025130    131400   -9.0900 -136.6800      31.8       102       132        60
OIR    2025130    131400   -9.0900 -136.6900      31.6       100       133        60
OIR    2025130    131400   -9.0900 -136.7000      31.4       100       131        60
OIR    2025130    131400   -9.0900 -136.7100      31.2        99       129        60
OIR    2025130    131400   -9.0900 -136.7200      31.0        98       126        60
OIR    2025130    131400   -9.0900 -136.7300      30.3        96       124        60
OIR    2025130    131400   -9.0900 -136.7400      29.9        93       121        60
OIR    2025130    131400   -9.0900 -136.7500      29.5        91       120        60
OIR    2025130    131400   -9.0900 -136.7600      29.1        90       120        60
OIR    2025130    131400   -9.0900 -136.7700      28.9        90       120        60
OIR    2025130    131400   -9.0900 -136.7800      28.8        90       120        60
OIR    2025130    131400   -9.0900 -136.7900      28.6        90       120        60
OIR    2025130    131400   -9.0900 -136.8000      28.2        90       120        60
OIR    2025130    131400   -9.0900 -136.8100      27.5        90       122        60
OIR    2025130    131400   -9.0900 -136.8200      26.5        89       123        60
OIR    2025130    131400   -9.0900 -136.8300      24.9        86       123        60
OIR    2025130    131400   -9.0900 -136.8400      24.3        85       122        60
OIR    2025130    131400   -9.0900 -136.8500      23.5        83       121        60
OIR    2025130    131400   -9.0900 -136.8600      23.2        82       121        60
OIR    2025130    131400   -9.0900 -136.8700      23.1        82       122        60
OIR    2025130    131400   -9.0900 -136.8800      22.9        82       124        60
OIR    2025130    131400   -9.0900 -136.8900      22.6        81       126        60
OIR    2025130    131400   -9.0900 -136.9000      22.8        81       128        60
OIR    2025130    131400   -9.0900 -136.9100      22.3        82       128        60
OIR    2025130    131400   -9.0900 -136.9200      21.3        83       127        60
OIR    2025130    131400   -9.0900 -136.9300      20.6        85       126        60
OIR    2025130    131400   -9.0900 -136.9400      20.3        86       123        60
OIR    2025130    131400   -9.0900 -136.9500      19.9        88       121        60
OIR    2025130    131400   -9.0900 -136.9600      19.4        90       120        60
OIR    2025130    131400   -9.0900 -136.9700      19.0        92       119        60
OIR    2025130    131400   -9.0900 -136.9800      18.9        94       117        60
OIR    2025130    131400   -9.0900 -136.9900      19.0        95       116        60
OIR    2025130    131400   -9.0900 -137.0000      19.2        96       115        60
OIR    2025130    131400   -9.0900 -137.0100      19.3        97       114        60
OIR    2025130    131400   -9.0900 -137.0200      19.3        97       114        60
OIR    2025130    131400   -9.0900 -137.0300      19.2        98       116        60
OIR    2025130    131400   -9.0900 -137.0400      19.1        98       116        60
OIR    2025130    131400   -9.0900 -137.0500      18.9        99       116        60
OIR    2025130    131400   -9.0900 -137.0600      18.8        99       116        60
OIR    2025130    131400   -9.0900 -137.0700      18.8        99       114        60
OIR    2025130    131400   -9.0900 -137.0800      18.8        99       112        60
OIR    2025130    131400   -9.0900 -137.0900      18.8        99       112        60
OIR    2025130    131400   -9.0900 -137.1000      18.8       100       112        60
OIR    2025130    131400   -9.0900 -137.1100      18.8       100       113        60
OIR    2025130    131400   -9.0900 -137.1200      18.8       100       113        60
OIR    2025130    131400   -9.0900 -137.1300      18.8       100       112        60
OIR    2025130    131400   -9.0900 -137.1400      18.8       100       114        60
OIR    2025130    131400   -9.0900 -137.1500      18.8       100       116        60
OIR    2025130    131400   -9.0900 -137.1600      18.8       100       116        60
OIR    2025130    131400   -9.0900 -137.1700      18.7       100       116        60
OIR    2025130    131400   -9.0900 -137.1800      18.5       101       116        60
OIR    2025130    131400   -9.0900 -137.1900      18.4       101       115        60
OIR    2025130    131400   -9.0900 -137.2000      18.0       101       115        60
OIR    2025130    131400   -9.0900 -137.2100      17.6       100       115        60
OIR    2025130    131400   -9.0900 -137.2200      17.1       100       114        60
OIR    2025130    131400   -9.0900 -137.2300      16.7        99       115        60
OIR    2025130    131400   -9.0900 -137.2400      16.2        98       116        60
OIR    2025130    131400   -9.0900 -137.2500      15.7        97       114        60
OIR    2025130    131400   -9.0900 -137.2600      15.3        95       112        60
OIR    2025130    131400   -9.0900 -137.2700      15.0        93       112        60
OIR    2025130    131400   -9.0900 -137.2800      14.6        91       112        60
OIR    2025130    131400   -9.0900 -137.2900      12.5        90       108        60
OIR    2025130    131400   -9.0900 -137.3000      12.5        89       105        60
OIR    2025130    131400   -9.0900 -137.3100      11.9        86       104        60
OIR    2025130    131400   -9.0900 -137.3200      12.7        83       103        60
OIR    2025130    131400   -9.0900 -137.3300      13.7        81       103        60
OIR    2025130    131400   -9.0900 -137.3400      14.5        80       103        60
OIR    2025130    131400   -9.0900 -137.3500      15.2        79       103        60
OIR    2025130    131400   -9.0900 -137.3600      15.5        76       103        60
OIR    2025130    131400   -9.0900 -137.3700      16.0        75       103        60
OIR    2025130    131400   -9.0900 -137.3800      16.3        74       103        60
OIR    2025130    131400   -9.0900 -137.3900      16.4        74       103        60
OIR    2025130    131400   -9.0900 -137.4000      15.6        80       103        60
OIR    2025130    131400   -9.0900 -137.4100      15.4        83       103        60
OIR    2025130    131400   -9.0900 -137.4200      15.3        84       103        60
OIR    2025130    131400   -9.0900 -137.4300      15.0        86       103        60
OIR    2025130    131400   -9.0900 -137.4400      14.6        89       103        60
OIR    2025130    131400   -9.0900 -137.4500      13.6        91       103        60
OIR    2025130    131400   -9.0900 -137.4600      12.3        92       103        60
OIR    2025130    131400   -9.0900 -137.4700      10.5        99       103        60
OIR    2025130    131400   -9.0900 -137.4800       9.4       101       103        60
OIR    2025130    131400   -9.0900 -137.4900       9.6        98       103        60
OIR    2025130    131400   -9.0900 -137.5000      11.0        91       103        60
OIR    2025130    131400   -9.0900 -137.5100      10.3        81       103        60
OIR    2025130    131400   -9.0900 -137.5200      12.2        65       103        60
OIR    2025130    131400   -9.0900 -137.5300      14.4        49       103        60
OIR    2025130    131400   -9.0900 -137.5400      15.6        42       103        60
OIR    2025130    131400   -9.0900 -137.5500      16.2        40       103        60
OIR    2025130    131400   -9.0900 -137.5600      16.9        39       103        60
OIR    2025130    131400   -9.0900 -137.5700      17.6        37       103        60
OIR    2025130    131400   -9.0900 -137.5800      17.9        35       103        60
OIR    2025130    131400   -9.0900 -137.5900      17.6        31       103        60
OIR    2025130    131400   -9.0900 -137.6000      16.8        20       103        60
OIR    2025130    131400   -9.0900 -137.6100      16.2        12       103        60
OIR    2025130    131400   -9.0900 -137.6200      16.1        10       103        60
OIR    2025130    131400   -9.0900 -137.6300      15.9         9       103        60
OIR    2025130    131400   -9.0900 -137.6400      15.7         7       103        60
OIR    2025130    131400   -9.0900 -137.6500      15.6         5       103        60
OIR    2025130    131400   -9.0900 -137.6600      15.6         2       103        60
OIR    2025130    131400   -9.0900 -137.6700      15.9       352       103        60
OIR    2025130    131400   -9.0900 -137.6800      18.3       337       104        60
OIR    2025130    131400   -9.0900 -137.6900      18.5       337       115        60
OIR    2025130    131400   -9.0900 -137.7000      18.6       339       126        60
OIR    2025130    131400   -9.0900 -137.7100      18.4       343       138        60
OIR    2025130    131400   -9.0900 -137.7200      18.2       344       147        60
OIR    2025130    131400   -9.0900 -137.7300      16.9       339       146        60
OIR    2025130    131400   -9.0900 -137.7400      16.0       337       144        60
OIR    2025130    131400   -9.0900 -137.7500      11.3       330       141        60
OIR    2025130    131400   -9.0900 -137.7600       4.6       324       137        60
OIR    2025130    131400   -9.0900 -137.8100       4.4       206       135        60
OIR    2025130    131400   -9.0900 -137.8200       4.7       202       142        60
OIR    2025130    131400   -9.0900 -137.8300       5.0       203       147        60
OIR    2025130    131400   -9.0900 -137.8400       5.0       200       147        60
OIR    2025130    131400   -9.0900 -138.1700      20.5        33       131        60
OIR    2025130    131400   -9.0900 -138.1800      20.3        33       116        60
OIR    2025130    131400   -9.0900 -138.1900      20.3        33       104        60
OIR    2025130    131400   -9.0900 -138.2000      20.3        33       104        60
OIR    2025130    131400   -9.0900 -138.2100      20.3        33       103        60
OIR    2025130    131400   -9.0900 -138.2200      20.4        32       103        60
OIR    2025130    131400   -9.0900 -138.2300      20.5        32       103        60
OIR    2025130    131400   -9.0900 -138.2400      20.6        31       103        60
OIR    2025130    131400   -9.0900 -138.2500      20.7        29       103        60
OIR    2025130    131400   -9.0900 -138.2600      20.7        25       103        60
OIR    2025130    131400   -9.0900 -138.2700      20.8        21       103        60
OIR    2025130    131400   -9.0900 -138.2800      21.0        19       103        60
OIR    2025130    131400   -9.0900 -138.2900      21.2        17       103        60
OIR    2025130    131400   -9.0900 -138.3000      21.4        14       103        60
OIR    2025130    131400   -9.0900 -138.3100      22.0        11       103        60
OIR    2025130    131400   -9.0900 -138.3200      23.4         6       103        60
OIR    2025130    131400   -9.0900 -138.3300      24.9         1       103        60
OIR    2025130    131400   -9.0900 -138.3400      25.6       359       103        60
OIR    2025130    131400   -9.0900 -138.3500      25.7       359       103        60
OIR    2025130    131400   -9.0900 -138.3600      25.8       358       103        60
OIR    2025130    131400   -9.0900 -138.3700      25.9       358       103        60
OIR    2025130    131400   -9.0900 -138.3800      26.0       358       103        60
OIR    2025130    131400   -9.0900 -138.3900      26.1       358       103        60
OIR    2025130    131400   -9.0900 -138.4000      26.1       357       103        60
OIR    2025130    131400   -9.0900 -138.4100      26.2       357       103        60
OIR    2025130    131400   -9.0900 -138.4200      26.3       357       103        60
OIR    2025130    131400   -9.0900 -138.4300      26.4       357       103        60
OIR    2025130    131400   -9.0900 -138.4400      26.6       357       103        60
OIR    2025130    131400   -9.0900 -138.4500      26.6       357       103        60
OIR    2025130    131400   -9.0900 -138.4600      26.7       357       103        60
OIR    2025130    131400   -9.0900 -138.4700      26.7       357       103        60
OIR    2025130    131400   -9.0900 -138.4800      26.7       357       103        60
OIR    2025130    131400   -9.0900 -138.4900      26.8       357       103        60
OIR    2025130    131400   -9.0900 -138.5000      26.8       357       103        60
OIR    2025130    131400   -9.0900 -138.5100      26.8       357       103        60
OIR    2025130    131400   -9.0900 -138.5200      26.7       357       103        60
OIR    2025130    131400   -9.0900 -138.5300      26.6       357       103        60
OIR    2025130    131400   -9.0900 -138.5400      26.5       358       103        60
OIR    2025130    131400   -9.0900 -138.5500      26.5       358       103        60
OIR    2025130    131400   -9.0900 -138.5600      26.4       358       103        60
OIR    2025130    131400   -9.0900 -138.5700      26.4       357       103        60
OIR    2025130    131400   -9.0900 -138.5800      26.3       357       104        60
OIR    2025130    131400   -9.0900 -138.5900      26.1       356       104        60
OIR    2025130    131400   -9.0900 -138.6000      25.9       356       105        60
OIR    2025130    131400   -9.0900 -138.6100      25.7       355       107        60
OIR    2025130    131400   -9.0900 -138.6200      25.6       355       107        60
OIR    2025130    131400   -9.0900 -138.6300      25.6       355       105        60
OIR    2025130    131400   -9.0900 -138.6400      25.5       355       104        60
OIR    2025130    131400   -9.0900 -138.6500      25.4       355       104        60
OIR    2025130    131400   -9.0900 -138.6600      25.2       355       104        60
OIR    2025130    131400   -9.0900 -138.6700      25.0       354       104        60
OIR    2025130    131400   -9.0900 -138.6800      24.4       353       109        60
OIR    2025130    131400   -9.0900 -138.6900      23.7       352       110        60
OIR    2025130    131400   -9.0900 -138.7000      23.0       350       108        60
OIR    2025130    131400   -9.0900 -138.7100      22.2       349       108        60
OIR    2025130    131400   -9.0900 -138.7200      21.5       347       108        60
OIR    2025130    131400   -9.0900 -138.7300      20.5       345       107        60
OIR    2025130    131400   -9.0900 -138.7400      19.1       342       105        60
OIR    2025130    131400   -9.0900 -138.7500      18.0       340       109        60
OIR    2025130    131400   -9.0900 -138.7600      17.6       339       111        60
OIR    2025130    131400   -9.0900 -138.7700      17.3       338       111        60
OIR    2025130    131400   -9.0900 -138.7800      17.1       337       111        60
OIR    2025130    131400   -9.0900 -138.7900      16.8       336       112        60
OIR    2025130    131400   -9.0900 -138.8000      16.6       335       114        60
OIR    2025130    131400   -9.0900 -138.8100      16.3       333       116        60
OIR    2025130    131400   -9.0900 -138.8200      16.0       331       116        60
OIR    2025130    131400   -9.0900 -138.8300      15.6       329       116        60
OIR    2025130    131400   -9.0900 -138.8400      15.3       327       117        60
OIR    2025130    131400   -9.0900 -138.8500      14.9       324       123        60
OIR    2025130    131400   -9.0900 -138.8600      14.7       322       124        60
OIR    2025130    131400   -9.0900 -138.8700      14.6       319       124        60
OIR    2025130    131400   -9.0900 -138.8800      14.6       317       124        60
OIR    2025130    131400   -9.0900 -138.8900      14.6       316       124        60
OIR    2025130    131400   -9.0900 -138.9000      14.7       314       127        60
OIR    2025130    131400   -9.0900 -138.9100      14.7       312       129        60
OIR    2025130    131400   -9.0900 -138.9200      14.7       310       131        60
OIR    2025130    131400   -9.0900 -138.9300      14.8       308       131        60
OIR    2025130    131400   -9.0900 -138.9400      14.8       308       132        60
OIR    2025130    131400   -9.0900 -138.9500      14.8       307       141        60
OIR    2025130    131400   -9.1000 -136.3300      39.8        97       143        60
OIR    2025130    131400   -9.1000 -136.4600      36.6       108       142        60
OIR    2025130    131400   -9.1000 -136.4700      36.7       108       142        60
OIR    2025130    131400   -9.1000 -136.4800      36.7       108       141        60
OIR    2025130    131400   -9.1000 -136.4900      36.7       108       141        60
OIR    2025130    131400   -9.1000 -136.5000      36.7       108       137        60
OIR    2025130    131400   -9.1000 -136.5100      36.7       108       132        60
OIR    2025130    131400   -9.1000 -136.5200      36.8       108       132        60
OIR    2025130    131400   -9.1000 -136.5300      36.8       108       134        60
OIR    2025130    131400   -9.1000 -136.5400      36.8       108       137        60
OIR    2025130    131400   -9.1000 -136.5500      36.7       107       139        60
OIR    2025130    131400   -9.1000 -136.5600      36.4       107       138        60
OIR    2025130    131400   -9.1000 -136.5700      35.9       106       137        60
OIR    2025130    131400   -9.1000 -136.5800      35.3       105       137        60
OIR    2025130    131400   -9.1000 -136.5900      34.6       105       137        60
OIR    2025130    131400   -9.1000 -136.6000      33.7       104       137        60
OIR    2025130    131400   -9.1000 -136.6100      33.0       103       136        60
OIR    2025130    131400   -9.1000 -136.6200      32.3       103       134        60
OIR    2025130    131400   -9.1000 -136.6300      31.8       102       133        60
OIR    2025130    131400   -9.1000 -136.6400      31.6       102       132        60
OIR    2025130    131400   -9.1000 -136.6500      31.5       102       132        60
OIR    2025130    131400   -9.1000 -136.6600      31.5       101       131        60
OIR    2025130    131400   -9.1000 -136.6700      31.6       101       132        60
OIR    2025130    131400   -9.1000 -136.6800      31.5       100       131        60
OIR    2025130    131400   -9.1000 -136.6900      31.4        99       129        60
OIR    2025130    131400   -9.1000 -136.7000      31.3        99       127        60
OIR    2025130    131400   -9.1000 -136.7100      31.0        98       124        60
OIR    2025130    131400   -9.1000 -136.7200      30.6        96       123        60
OIR    2025130    131400   -9.1000 -136.7300      29.8        93       123        60
OIR    2025130    131400   -9.1000 -136.7400      29.6        91       119        60
OIR    2025130    131400   -9.1000 -136.7500      29.4        90       116        60
OIR    2025130    131400   -9.1000 -136.7600      29.2        90       116        60
OIR    2025130    131400   -9.1000 -136.7700      29.0        90       117        60
OIR    2025130    131400   -9.1000 -136.7800      28.9        90       117        60
OIR    2025130    131400   -9.1000 -136.7900      28.7        89       117        60
OIR    2025130    131400   -9.1000 -136.8000      28.4        89       120        60
OIR    2025130    131400   -9.1000 -136.8100      27.8        89       120        60
OIR    2025130    131400   -9.1000 -136.8200      26.3        87       119        60
OIR    2025130    131400   -9.1000 -136.8300      25.3        85       120        60
OIR    2025130    131400   -9.1000 -136.8400      24.7        84       120        60
OIR    2025130    131400   -9.1000 -136.8500      24.0        82       117        60
OIR    2025130    131400   -9.1000 -136.8600      23.7        81       117        60
OIR    2025130    131400   -9.1000 -136.8700      23.7        81       120        60
OIR    2025130    131400   -9.1000 -136.8800      23.6        80       123        60
OIR    2025130    131400   -9.1000 -136.8900      23.6        80       125        60
OIR    2025130    131400   -9.1000 -136.9000      23.6        80       127        60
OIR    2025130    131400   -9.1000 -136.9100      23.5        80       128        60
OIR    2025130    131400   -9.1000 -136.9200      22.9        80       127        60
OIR    2025130    131400   -9.1000 -136.9300      22.3        82       125        60
OIR    2025130    131400   -9.1000 -136.9400      21.9        83       124        60
OIR    2025130    131400   -9.1000 -136.9500      21.4        84       122        60
OIR    2025130    131400   -9.1000 -136.9600      20.7        86       120        60
OIR    2025130    131400   -9.1000 -136.9700      20.0        88       119        60
OIR    2025130    131400   -9.1000 -136.9800      19.7        91       117        60
OIR    2025130    131400   -9.1000 -136.9900      19.6        93       116        60
OIR    2025130    131400   -9.1000 -137.0000      19.7        94       115        60
OIR    2025130    131400   -9.1000 -137.0100      19.7        95       114        60
OIR    2025130    131400   -9.1000 -137.0200      19.6        96       114        60
OIR    2025130    131400   -9.1000 -137.0300      19.6        97       116        60
OIR    2025130    131400   -9.1000 -137.0400      19.5        98       119        60
OIR    2025130    131400   -9.1000 -137.0500      19.2        98       116        60
OIR    2025130    131400   -9.1000 -137.0600      19.0        99       115        60
OIR    2025130    131400   -9.1000 -137.0700      18.9        99       112        60
OIR    2025130    131400   -9.1000 -137.0800      18.8        99       110        60
OIR    2025130    131400   -9.1000 -137.0900      18.8        99       111        60
OIR    2025130    131400   -9.1000 -137.1000      18.8        99       112        60
OIR    2025130    131400   -9.1000 -137.1100      18.8        99       113        60
OIR    2025130    131400   -9.1000 -137.1200      18.8        99       113        60
OIR    2025130    131400   -9.1000 -137.1300      18.8       100       112        60
OIR    2025130    131400   -9.1000 -137.1400      18.8       100       113        60
OIR    2025130    131400   -9.1000 -137.1500      18.8       100       115        60
OIR    2025130    131400   -9.1000 -137.1600      18.8       100       115        60
OIR    2025130    131400   -9.1000 -137.1700      18.7       100       116        60
OIR    2025130    131400   -9.1000 -137.1800      18.6       100       114        60
OIR    2025130    131400   -9.1000 -137.1900      18.5       100       113        60
OIR    2025130    131400   -9.1000 -137.2000      18.1        99       113        60
OIR    2025130    131400   -9.1000 -137.2100      17.7        99       113        60
OIR    2025130    131400   -9.1000 -137.2200      17.2        98       114        60
OIR    2025130    131400   -9.1000 -137.2300      16.8        97       115        60
OIR    2025130    131400   -9.1000 -137.2400      16.3        95       115        60
OIR    2025130    131400   -9.1000 -137.2500      15.8        94       113        60
OIR    2025130    131400   -9.1000 -137.2600      15.4        92       111        60
OIR    2025130    131400   -9.1000 -137.2700      15.1        90       111        60
OIR    2025130    131400   -9.1000 -137.2800      14.9        88       112        60
OIR    2025130    131400   -9.1000 -137.2900      13.3        86       108        60
OIR    2025130    131400   -9.1000 -137.3000      13.4        84       104        60
OIR    2025130    131400   -9.1000 -137.3100      13.0        79       104        60
OIR    2025130    131400   -9.1000 -137.3200      13.9        76       103        60
OIR    2025130    131400   -9.1000 -137.3300      14.8        74       103        60
OIR    2025130    131400   -9.1000 -137.3400      15.4        73       103        60
OIR    2025130    131400   -9.1000 -137.3500      15.6        71       103        60
OIR    2025130    131400   -9.1000 -137.3600      15.9        70       103        60
OIR    2025130    131400   -9.1000 -137.3700      16.3        69       103        60
OIR    2025130    131400   -9.1000 -137.3800      16.8        67       103        60
OIR    2025130    131400   -9.1000 -137.3900      17.3        66       103        60
OIR    2025130    131400   -9.1000 -137.4000      17.3        67       103        60
OIR    2025130    131400   -9.1000 -137.4100      16.5        72       103        60
OIR    2025130    131400   -9.1000 -137.4200      15.8        77       103        60
OIR    2025130    131400   -9.1000 -137.4300      15.4        79       103        60
OIR    2025130    131400   -9.1000 -137.4400      14.7        80       103        60
OIR    2025130    131400   -9.1000 -137.4500      13.6        79       103        60
OIR    2025130    131400   -9.1000 -137.4600      12.3        78       103        60
OIR    2025130    131400   -9.1000 -137.4700      10.7        78       103        60
OIR    2025130    131400   -9.1000 -137.4800       8.6        78       103        60
OIR    2025130    131400   -9.1000 -137.4900       8.5        77       103        60
OIR    2025130    131400   -9.1000 -137.5000       9.9        73       103        60
OIR    2025130    131400   -9.1000 -137.5100       9.7        58       103        60
OIR    2025130    131400   -9.1000 -137.5200      12.3        47       103        60
OIR    2025130    131400   -9.1000 -137.5300      14.7        39       103        60
OIR    2025130    131400   -9.1000 -137.5400      15.8        37       103        60
OIR    2025130    131400   -9.1000 -137.5500      16.2        34       103        60
OIR    2025130    131400   -9.1000 -137.5600      16.8        31       103        60
OIR    2025130    131400   -9.1000 -137.5700      17.3        30       103        60
OIR    2025130    131400   -9.1000 -137.5800      17.4        30       103        60
OIR    2025130    131400   -9.1000 -137.5900      16.9        23       103        60
OIR    2025130    131400   -9.1000 -137.6000      16.6        15       103        60
OIR    2025130    131400   -9.1000 -137.6100      16.4        12       103        60
OIR    2025130    131400   -9.1000 -137.6200      16.3        11       103        60
OIR    2025130    131400   -9.1000 -137.6300      16.2        10       103        60
OIR    2025130    131400   -9.1000 -137.6400      16.2         7       103        60
OIR    2025130    131400   -9.1000 -137.6500      16.2         5       103        60
OIR    2025130    131400   -9.1000 -137.6600      16.2         2       103        60
OIR    2025130    131400   -9.1000 -137.6700      16.8       350       104        60
OIR    2025130    131400   -9.1000 -137.6800      18.6       338       104        60
OIR    2025130    131400   -9.1000 -137.6900      18.6       338       115        60
OIR    2025130    131400   -9.1000 -137.7000      18.6       339       126        60
OIR    2025130    131400   -9.1000 -137.7100      18.4       341       140        60
OIR    2025130    131400   -9.1000 -137.7400      16.2       337       148        60
OIR    2025130    131400   -9.1000 -137.7500      10.5       341       142        60
OIR    2025130    131400   -9.1000 -137.7600       4.8       348       136        60
OIR    2025130    131400   -9.1000 -137.8100       4.1       201       134        60
OIR    2025130    131400   -9.1000 -137.8200       4.4       198       140        60
OIR    2025130    131400   -9.1000 -137.8300       4.4       198       144        60
OIR    2025130    131400   -9.1000 -137.8400       4.5       199       143        60
OIR    2025130    131400   -9.1000 -137.8500       4.5       198       143        60
OIR    2025130    131400   -9.1000 -137.8600       4.5       198       143        60
OIR    2025130    131400   -9.1000 -137.8700       4.5       200       146        60
OIR    2025130    131400   -9.1000 -138.1700      19.5        31       133        60
OIR    2025130    131400   -9.1000 -138.1800      20.3        33       116        60
OIR    2025130    131400   -9.1000 -138.1900      20.3        33       105        60
OIR    2025130    131400   -9.1000 -138.2000      20.4        33       104        60
OIR    2025130    131400   -9.1000 -138.2100      20.4        33       103        60
OIR    2025130    131400   -9.1000 -138.2200      20.5        32       103        60
OIR    2025130    131400   -9.1000 -138.2300      20.6        32       103        60
OIR    2025130    131400   -9.1000 -138.2400      20.8        31       103        60
OIR    2025130    131400   -9.1000 -138.2500      21.0        29       103        60
OIR    2025130    131400   -9.1000 -138.2600      21.1        25       103        60
OIR    2025130    131400   -9.1000 -138.2700      21.2        22       103        60
OIR    2025130    131400   -9.1000 -138.2800      21.3        20       103        60
OIR    2025130    131400   -9.1000 -138.2900      21.5        18       103        60
OIR    2025130    131400   -9.1000 -138.3000      21.7        15       103        60
OIR    2025130    131400   -9.1000 -138.3100      22.3        11       103        60
OIR    2025130    131400   -9.1000 -138.3200      23.6         6       103        60
OIR    2025130    131400   -9.1000 -138.3300      25.2         1       103        60
OIR    2025130    131400   -9.1000 -138.3400      25.7       359       103        60
OIR    2025130    131400   -9.1000 -138.3500      25.8       359       103        60
OIR    2025130    131400   -9.1000 -138.3600      25.9       358       103        60
OIR    2025130    131400   -9.1000 -138.3700      26.0       358       103        60
OIR    2025130    131400   -9.1000 -138.3800      26.1       358       103        60
OIR    2025130    131400   -9.1000 -138.3900      26.2       358       103        60
OIR    2025130    131400   -9.1000 -138.4000      26.2       357       103        60
OIR    2025130    131400   -9.1000 -138.4100      26.3       357       103        60
OIR    2025130    131400   -9.1000 -138.4200      26.4       357       103        60
OIR    2025130    131400   -9.1000 -138.4300      26.5       357       103        60
OIR    2025130    131400   -9.1000 -138.4400      26.6       357       103        60
OIR    2025130    131400   -9.1000 -138.4500      26.7       357       103        60
OIR    2025130    131400   -9.1000 -138.4600      26.7       357       103        60
OIR    2025130    131400   -9.1000 -138.4700      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.4800      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.4900      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5000      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5100      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5200      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5300      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5400      26.8       357       103        60
OIR    2025130    131400   -9.1000 -138.5500      26.7       357       103        60
OIR    2025130    131400   -9.1000 -138.5600      26.7       357       103        60
OIR    2025130    131400   -9.1000 -138.5700      26.6       357       103        60
OIR    2025130    131400   -9.1000 -138.5800      26.4       357       104        60
OIR    2025130    131400   -9.1000 -138.5900      26.3       356       104        60
OIR    2025130    131400   -9.1000 -138.6000      26.0       356       104        60
OIR    2025130    131400   -9.1000 -138.6100      25.8       355       105        60
OIR    2025130    131400   -9.1000 -138.6200      25.7       355       104        60
OIR    2025130    131400   -9.1000 -138.6300      25.6       355       103        60
OIR    2025130    131400   -9.1000 -138.6400      25.5       355       103        60
OIR    2025130    131400   -9.1000 -138.6500      25.5       355       103        60
OIR    2025130    131400   -9.1000 -138.6600      25.4       354       103        60
OIR    2025130    131400   -9.1000 -138.6700      25.2       354       104        60
OIR    2025130    131400   -9.1000 -138.6800      24.9       354       108        60
OIR    2025130    131400   -9.1000 -138.6900      24.3       353       109        60
OIR    2025130    131400   -9.1000 -138.7000      23.3       351       108        60
OIR    2025130    131400   -9.1000 -138.7100      22.5       349       107        60
OIR    2025130    131400   -9.1000 -138.7200      21.9       348       107        60
OIR    2025130    131400   -9.1000 -138.7300      20.9       346       105        60
OIR    2025130    131400   -9.1000 -138.7400      19.5       343       104        60
OIR    2025130    131400   -9.1000 -138.7500      18.3       340       108        60
OIR    2025130    131400   -9.1000 -138.7600      17.8       339       109        60
OIR    2025130    131400   -9.1000 -138.7700      17.5       338       110        60
OIR    2025130    131400   -9.1000 -138.7800      17.2       337       111        60
OIR    2025130    131400   -9.1000 -138.7900      17.0       336       113        60
OIR    2025130    131400   -9.1000 -138.8000      16.7       334       116        60
OIR    2025130    131400   -9.1000 -138.8100      16.4       333       120        60
OIR    2025130    131400   -9.1000 -138.8200      16.0       330       119        60
OIR    2025130    131400   -9.1000 -138.8300      15.6       328       117        60
OIR    2025130    131400   -9.1000 -138.8400      15.3       325       121        60
OIR    2025130    131400   -9.1000 -138.8500      15.0       323       124        60
OIR    2025130    131400   -9.1000 -138.8600      14.8       320       125        60
OIR    2025130    131400   -9.1000 -138.8700      14.7       318       125        60
OIR    2025130    131400   -9.1000 -138.8800      14.7       316       125        60
OIR    2025130    131400   -9.1000 -138.8900      14.7       315       126        60
OIR    2025130    131400   -9.1000 -138.9000      14.7       314       127        60
OIR    2025130    131400   -9.1000 -138.9100      14.8       313       129        60
OIR    2025130    131400   -9.1000 -138.9200      14.8       311       129        60
OIR    2025130    131400   -9.1000 -138.9300      14.8       309       129        60
OIR    2025130    131400   -9.1000 -138.9400      14.8       308       131        60
OIR    2025130    131400   -9.1000 -138.9500      14.8       308       139        60
OIR    2025130    131400   -9.1000 -138.9600      13.9       309       147        60
OIR    2025130    131400   -9.1100 -136.3200      39.7        96       143        60
OIR    2025130    131400   -9.1100 -136.3300      39.9        97       142        60
OIR    2025130    131400   -9.1100 -136.5000      36.8       108       142        60
OIR    2025130    131400   -9.1100 -136.5100      36.8       108       137        60
OIR    2025130    131400   -9.1100 -136.5200      36.8       108       136        60
OIR    2025130    131400   -9.1100 -136.5300      36.9       108       136        60
OIR    2025130    131400   -9.1100 -136.5400      36.8       107       137        60
OIR    2025130    131400   -9.1100 -136.5500      36.3       106       138        60
OIR    2025130    131400   -9.1100 -136.5600      36.0       105       136        60
OIR    2025130    131400   -9.1100 -136.5700      35.5       105       135        60
OIR    2025130    131400   -9.1100 -136.5800      35.1       104       134        60
OIR    2025130    131400   -9.1100 -136.5900      34.5       104       135        60
OIR    2025130    131400   -9.1100 -136.6000      33.7       103       135        60
OIR    2025130    131400   -9.1100 -136.6100      32.9       102       135        60
OIR    2025130    131400   -9.1100 -136.6200      32.2       102       134        60
OIR    2025130    131400   -9.1100 -136.6300      31.5       102       133        60
OIR    2025130    131400   -9.1100 -136.6400      31.4       101       133        60
OIR    2025130    131400   -9.1100 -136.6500      31.2       101       132        60
OIR    2025130    131400   -9.1100 -136.6600      31.3       100       132        60
OIR    2025130    131400   -9.1100 -136.6700      31.4       100       132        60
OIR    2025130    131400   -9.1100 -136.6800      31.4        99       130        60
OIR    2025130    131400   -9.1100 -136.6900      31.3        98       127        60
OIR    2025130    131400   -9.1100 -136.7000      31.2        98       125        60
OIR    2025130    131400   -9.1100 -136.7100      30.7        96       123        60
OIR    2025130    131400   -9.1100 -136.7200      30.4        93       123        60
OIR    2025130    131400   -9.1100 -136.7300      29.7        91       122        60
OIR    2025130    131400   -9.1100 -136.7400      29.4        90       117        60
OIR    2025130    131400   -9.1100 -136.7500      29.3        90       115        60
OIR    2025130    131400   -9.1100 -136.7600      29.2        90       114        60
OIR    2025130    131400   -9.1100 -136.7700      29.0        90       113        60
OIR    2025130    131400   -9.1100 -136.7800      28.9        89       115        60
OIR    2025130    131400   -9.1100 -136.7900      28.7        89       116        60
OIR    2025130    131400   -9.1100 -136.8000      28.6        89       119        60
OIR    2025130    131400   -9.1100 -136.8100      27.8        88       119        60
OIR    2025130    131400   -9.1100 -136.8200      26.3        86       119        60
OIR    2025130    131400   -9.1100 -136.8300      25.5        84       119        60
OIR    2025130    131400   -9.1100 -136.8400      24.8        82       119        60
OIR    2025130    131400   -9.1100 -136.8500      24.4        81       117        60
OIR    2025130    131400   -9.1100 -136.8600      24.1        80       119        60
OIR    2025130    131400   -9.1100 -136.8700      24.0        80       121        60
OIR    2025130    131400   -9.1100 -136.8800      24.0        79       123        60
OIR    2025130    131400   -9.1100 -136.8900      24.0        79       125        60
OIR    2025130    131400   -9.1100 -136.9000      24.0        79       127        60
OIR    2025130    131400   -9.1100 -136.9100      24.0        79       127        60
OIR    2025130    131400   -9.1100 -136.9200      23.8        79       126        60
OIR    2025130    131400   -9.1100 -136.9300      23.3        80       125        60
OIR    2025130    131400   -9.1100 -136.9400      22.9        81       123        60
OIR    2025130    131400   -9.1100 -136.9500      22.5        81       121        60
OIR    2025130    131400   -9.1100 -136.9600      22.0        83       120        60
OIR    2025130    131400   -9.1100 -136.9700      21.3        85       119        60
OIR    2025130    131400   -9.1100 -136.9800      20.7        88       116        60
OIR    2025130    131400   -9.1100 -136.9900      20.5        91       116        60
OIR    2025130    131400   -9.1100 -137.0000      20.3        93       114        60
OIR    2025130    131400   -9.1100 -137.0100      20.1        94       114        60
OIR    2025130    131400   -9.1100 -137.0200      20.0        95       115        60
OIR    2025130    131400   -9.1100 -137.0300      19.9        96       116        60
OIR    2025130    131400   -9.1100 -137.0400      19.8        97       116        60
OIR    2025130    131400   -9.1100 -137.0500      19.5        98       116        60
OIR    2025130    131400   -9.1100 -137.0600      19.1        98       114        60
OIR    2025130    131400   -9.1100 -137.0700      18.9        99       111        60
OIR    2025130    131400   -9.1100 -137.0800      18.9        99       110        60
OIR    2025130    131400   -9.1100 -137.0900      18.9        99       111        60
OIR    2025130    131400   -9.1100 -137.1000      18.9        99       112        60
OIR    2025130    131400   -9.1100 -137.1100      18.9        99       112        60
OIR    2025130    131400   -9.1100 -137.1200      18.9        99       113        60
OIR    2025130    131400   -9.1100 -137.1300      18.8        99       113        60
OIR    2025130    131400   -9.1100 -137.1400      18.8        99       113        60
OIR    2025130    131400   -9.1100 -137.1500      18.8        99       114        60
OIR    2025130    131400   -9.1100 -137.1600      18.8        99       114        60
OIR    2025130    131400   -9.1100 -137.1700      18.8        99       113        60
OIR    2025130    131400   -9.1100 -137.1800      18.7        99       113        60
OIR    2025130    131400   -9.1100 -137.1900      18.5        99       113        60
OIR    2025130    131400   -9.1100 -137.2000      18.2        98       113        60
OIR    2025130    131400   -9.1100 -137.2100      17.7        97       114        60
OIR    2025130    131400   -9.1100 -137.2200      17.3        96       114        60
OIR    2025130    131400   -9.1100 -137.2300      16.9        95       114        60
OIR    2025130    131400   -9.1100 -137.2400      16.4        94       114        60
OIR    2025130    131400   -9.1100 -137.2500      15.9        92       113        60
OIR    2025130    131400   -9.1100 -137.2600      15.4        89       111        60
OIR    2025130    131400   -9.1100 -137.2700      15.1        86       112        60
OIR    2025130    131400   -9.1100 -137.2800      15.1        84       113        60
OIR    2025130    131400   -9.1100 -137.2900      14.8        81       107        60
OIR    2025130    131400   -9.1100 -137.3000      14.8        79       104        60
OIR    2025130    131400   -9.1100 -137.3100      14.6        76       104        60
OIR    2025130    131400   -9.1100 -137.3200      15.0        74       103        60
OIR    2025130    131400   -9.1100 -137.3300      15.4        72       103        60
OIR    2025130    131400   -9.1100 -137.3400      15.7        71       103        60
OIR    2025130    131400   -9.1100 -137.3500      15.8        70       103        60
OIR    2025130    131400   -9.1100 -137.3600      16.1        69       103        60
OIR    2025130    131400   -9.1100 -137.3700      16.5        67       103        60
OIR    2025130    131400   -9.1100 -137.3800      17.0        66       103        60
OIR    2025130    131400   -9.1100 -137.3900      17.4        65       103        60
OIR    2025130    131400   -9.1100 -137.4000      17.8        64       103        60
OIR    2025130    131400   -9.1100 -137.4100      17.9        64       103        60
OIR    2025130    131400   -9.1100 -137.4200      17.5        66       103        60
OIR    2025130    131400   -9.1100 -137.4300      16.5        69       103        60
OIR    2025130    131400   -9.1100 -137.4400      14.9        70       103        60
OIR    2025130    131400   -9.1100 -137.4500      13.8        70       103        60
OIR    2025130    131400   -9.1100 -137.4600      12.5        68       103        60
OIR    2025130    131400   -9.1100 -137.4700      10.9        64       103        60
OIR    2025130    131400   -9.1100 -137.4800       9.2        57       103        60
OIR    2025130    131400   -9.1100 -137.4900       9.2        53       103        60
OIR    2025130    131400   -9.1100 -137.5000      10.8        51       103        60
OIR    2025130    131400   -9.1100 -137.5100      11.4        36       103        60
OIR    2025130    131400   -9.1100 -137.5200      14.0        31       103        60
OIR    2025130    131400   -9.1100 -137.5300      16.0        29       103        60
OIR    2025130    131400   -9.1100 -137.5400      17.2        27       103        60
OIR    2025130    131400   -9.1100 -137.5500      17.5        25       103        60
OIR    2025130    131400   -9.1100 -137.5600      17.5        25       103        60
OIR    2025130    131400   -9.1100 -137.5700      17.3        26       103        60
OIR    2025130    131400   -9.1100 -137.5800      17.2        26       103        60
OIR    2025130    131400   -9.1100 -137.5900      16.6        17       103        60
OIR    2025130    131400   -9.1100 -137.6000      16.5        14       103        60
OIR    2025130    131400   -9.1100 -137.6100      16.4        12       103        60
OIR    2025130    131400   -9.1100 -137.6200      16.4        11       103        60
OIR    2025130    131400   -9.1100 -137.6300      16.4        10       103        60
OIR    2025130    131400   -9.1100 -137.6400      16.6         7       103        60
OIR    2025130    131400   -9.1100 -137.6500      16.8         4       103        60
OIR    2025130    131400   -9.1100 -137.6600      17.0         1       103        60
OIR    2025130    131400   -9.1100 -137.6700      17.5       349       104        60
OIR    2025130    131400   -9.1100 -137.6800      18.6       340       109        60
OIR    2025130    131400   -9.1100 -137.6900      18.6       339       117        60
OIR    2025130    131400   -9.1100 -137.7000      18.4       340       127        60
OIR    2025130    131400   -9.1100 -137.7100      17.9       340       138        60
OIR    2025130    131400   -9.1100 -137.7200      16.6       344       147        60
OIR    2025130    131400   -9.1100 -137.7400      15.0       338       148        60
OIR    2025130    131400   -9.1100 -137.7500      10.7       346       141        60
OIR    2025130    131400   -9.1100 -137.7600       8.0       350       136        60
OIR    2025130    131400   -9.1100 -137.7700       4.6       352       132        60
OIR    2025130    131400   -9.1100 -137.8200       4.0       195       140        60
OIR    2025130    131400   -9.1100 -137.8300       4.2       197       144        60
OIR    2025130    131400   -9.1100 -137.8400       4.3       198       143        60
OIR    2025130    131400   -9.1100 -137.8500       4.3       199       141        60
OIR    2025130    131400   -9.1100 -137.8600       4.3       199       140        60
OIR    2025130    131400   -9.1100 -137.8700       4.2       202       142        60
OIR    2025130    131400   -9.1100 -137.8800       4.2       209       146        60
OIR    2025130    131400   -9.1100 -138.1700      16.6        28       142        60
OIR    2025130    131400   -9.1100 -138.1800      20.2        33       124        60
OIR    2025130    131400   -9.1100 -138.1900      20.4        33       111        60
OIR    2025130    131400   -9.1100 -138.2000      20.5        33       107        60
OIR    2025130    131400   -9.1100 -138.2100      20.5        33       104        60
OIR    2025130    131400   -9.1100 -138.2200      20.6        32       103        60
OIR    2025130    131400   -9.1100 -138.2300      20.9        32       103        60
OIR    2025130    131400   -9.1100 -138.2400      21.2        31       103        60
OIR    2025130    131400   -9.1100 -138.2500      21.3        29       103        60
OIR    2025130    131400   -9.1100 -138.2600      21.4        26       103        60
OIR    2025130    131400   -9.1100 -138.2700      21.5        22       103        60
OIR    2025130    131400   -9.1100 -138.2800      21.6        20       103        60
OIR    2025130    131400   -9.1100 -138.2900      21.7        18       103        60
OIR    2025130    131400   -9.1100 -138.3000      22.0        15       103        60
OIR    2025130    131400   -9.1100 -138.3100      22.6        11       103        60
OIR    2025130    131400   -9.1100 -138.3200      23.8         6       103        60
OIR    2025130    131400   -9.1100 -138.3300      25.3         1       103        60
OIR    2025130    131400   -9.1100 -138.3400      25.8       359       103        60
OIR    2025130    131400   -9.1100 -138.3500      25.9       359       103        60
OIR    2025130    131400   -9.1100 -138.3600      26.0       359       103        60
OIR    2025130    131400   -9.1100 -138.3700      26.1       358       103        60
OIR    2025130    131400   -9.1100 -138.3800      26.2       358       103        60
OIR    2025130    131400   -9.1100 -138.3900      26.3       358       103        60
OIR    2025130    131400   -9.1100 -138.4000      26.4       358       103        60
OIR    2025130    131400   -9.1100 -138.4100      26.4       357       103        60
OIR    2025130    131400   -9.1100 -138.4200      26.5       357       103        60
OIR    2025130    131400   -9.1100 -138.4300      26.6       357       103        60
OIR    2025130    131400   -9.1100 -138.4400      26.7       357       103        60
OIR    2025130    131400   -9.1100 -138.4500      26.7       357       103        60
OIR    2025130    131400   -9.1100 -138.4600      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.4700      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.4800      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.4900      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.5000      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.5100      26.9       357       103        60
OIR    2025130    131400   -9.1100 -138.5200      26.9       357       103        60
OIR    2025130    131400   -9.1100 -138.5300      26.9       357       103        60
OIR    2025130    131400   -9.1100 -138.5400      26.9       357       103        60
OIR    2025130    131400   -9.1100 -138.5500      26.9       357       103        60
OIR    2025130    131400   -9.1100 -138.5600      26.8       357       103        60
OIR    2025130    131400   -9.1100 -138.5700      26.7       357       104        60
OIR    2025130    131400   -9.1100 -138.5800      26.6       356       104        60
OIR    2025130    131400   -9.1100 -138.5900      26.5       356       104        60
OIR    2025130    131400   -9.1100 -138.6000      26.2       356       105        60
OIR    2025130    131400   -9.1100 -138.6100      25.9       355       104        60
OIR    2025130    131400   -9.1100 -138.6200      25.7       355       104        60
OIR    2025130    131400   -9.1100 -138.6300      25.6       355       103        60
OIR    2025130    131400   -9.1100 -138.6400      25.5       355       103        60
OIR    2025130    131400   -9.1100 -138.6500      25.5       354       103        60
OIR    2025130    131400   -9.1100 -138.6600      25.4       354       103        60
OIR    2025130    131400   -9.1100 -138.6700      25.4       354       103        60
OIR    2025130    131400   -9.1100 -138.6800      25.3       354       104        60
OIR    2025130    131400   -9.1100 -138.6900      24.9       354       104        60
OIR    2025130    131400   -9.1100 -138.7000      24.0       352       104        60
OIR    2025130    131400   -9.1100 -138.7100      22.9       350       105        60
OIR    2025130    131400   -9.1100 -138.7200      22.2       348       105        60
OIR    2025130    131400   -9.1100 -138.7300      21.3       347       107        60
OIR    2025130    131400   -9.1100 -138.7400      19.9       344       107        60
OIR    2025130    131400   -9.1100 -138.7500      18.7       341       108        60
OIR    2025130    131400   -9.1100 -138.7600      18.1       339       109        60
OIR    2025130    131400   -9.1100 -138.7700      17.7       338       110        60
OIR    2025130    131400   -9.1100 -138.7800      17.4       337       111        60
OIR    2025130    131400   -9.1100 -138.7900      17.1       335       116        60
OIR    2025130    131400   -9.1100 -138.8000      16.8       333       119        60
OIR    2025130    131400   -9.1100 -138.8100      16.4       331       122        60
OIR    2025130    131400   -9.1100 -138.8200      16.0       328       123        60
OIR    2025130    131400   -9.1100 -138.8300      15.7       325       124        60
OIR    2025130    131400   -9.1100 -138.8400      15.4       323       125        60
OIR    2025130    131400   -9.1100 -138.8500      15.1       321       125        60
OIR    2025130    131400   -9.1100 -138.8600      14.9       319       126        60
OIR    2025130    131400   -9.1100 -138.8700      14.8       317       127        60
OIR    2025130    131400   -9.1100 -138.8800      14.7       316       127        60
OIR    2025130    131400   -9.1100 -138.8900      14.7       315       128        60
OIR    2025130    131400   -9.1100 -138.9000      14.7       314       130        60
OIR    2025130    131400   -9.1100 -138.9100      14.8       313       130        60
OIR    2025130    131400   -9.1100 -138.9200      14.8       312       128        60
OIR    2025130    131400   -9.1100 -138.9300      14.8       310       129        60
OIR    2025130    131400   -9.1100 -138.9400      14.8       308       131        60
OIR    2025130    131400   -9.1100 -138.9500      14.7       308       134        60
OIR    2025130    131400   -9.1100 -138.9600      13.5       310       137        60
OIR    2025130    131400   -9.1100 -138.9700      12.1       314       144        60
OIR    2025130    131400   -9.1200 -136.3100      39.3        96       142        60
OIR    2025130    131400   -9.1200 -136.3200      39.7        96       141        60
OIR    2025130    131400   -9.1200 -136.3300      40.0        96       141        60
OIR    2025130    131400   -9.1200 -136.5100      36.8       108       142        60
OIR    2025130    131400   -9.1200 -136.5200      36.7       107       139        60
OIR    2025130    131400   -9.1200 -136.5300      36.6       106       137        60
OIR    2025130    131400   -9.1200 -136.5400      36.2       104       137        60
OIR    2025130    131400   -9.1200 -136.5500      35.8       104       136        60
OIR    2025130    131400   -9.1200 -136.5600      35.6       103       135        60
OIR    2025130    131400   -9.1200 -136.5700      35.3       103       133        60
OIR    2025130    131400   -9.1200 -136.5800      34.8       103       132        60
OIR    2025130    131400   -9.1200 -136.5900      34.2       102       132        60
OIR    2025130    131400   -9.1200 -136.6000      33.4       102       133        60
OIR    2025130    131400   -9.1200 -136.6100      32.6       101       134        60
OIR    2025130    131400   -9.1200 -136.6200      31.8       101       134        60
OIR    2025130    131400   -9.1200 -136.6300      31.2       101       133        60
OIR    2025130    131400   -9.1200 -136.6400      31.1       100       133        60
OIR    2025130    131400   -9.1200 -136.6500      31.0       100       132        60
OIR    2025130    131400   -9.1200 -136.6600      31.1        99       132        60
OIR    2025130    131400   -9.1200 -136.6700      31.1        99       132        60
OIR    2025130    131400   -9.1200 -136.6800      31.1        98       129        60
OIR    2025130    131400   -9.1200 -136.6900      31.1        97       126        60
OIR    2025130    131400   -9.1200 -136.7000      31.0        96       124        60
OIR    2025130    131400   -9.1200 -136.7100      30.4        93       122        60
OIR    2025130    131400   -9.1200 -136.7200      30.2        92       122        60
OIR    2025130    131400   -9.1200 -136.7300      29.5        91       122        60
OIR    2025130    131400   -9.1200 -136.7400      29.3        90       117        60
OIR    2025130    131400   -9.1200 -136.7500      29.3        90       114        60
OIR    2025130    131400   -9.1200 -136.7600      29.2        90       112        60
OIR    2025130    131400   -9.1200 -136.7700      29.0        89       111        60
OIR    2025130    131400   -9.1200 -136.7800      28.8        89       113        60
OIR    2025130    131400   -9.1200 -136.7900      28.7        89       116        60
OIR    2025130    131400   -9.1200 -136.8000      28.6        89       117        60
OIR    2025130    131400   -9.1200 -136.8100      27.5        87       117        60
OIR    2025130    131400   -9.1200 -136.8200      26.2        85       117        60
OIR    2025130    131400   -9.1200 -136.8300      25.5        83       117        60
OIR    2025130    131400   -9.1200 -136.8400      24.8        81       117        60
OIR    2025130    131400   -9.1200 -136.8500      24.6        80       117        60
OIR    2025130    131400   -9.1200 -136.8600      24.4        80       119        60
OIR    2025130    131400   -9.1200 -136.8700      24.3        79       121        60
OIR    2025130    131400   -9.1200 -136.8800      24.3        79       123        60
OIR    2025130    131400   -9.1200 -136.8900      24.3        79       125        60
OIR    2025130    131400   -9.1200 -136.9000      24.3        79       125        60
OIR    2025130    131400   -9.1200 -136.9100      24.3        79       125        60
OIR    2025130    131400   -9.1200 -136.9200      24.3        79       125        60
OIR    2025130    131400   -9.1200 -136.9300      24.1        79       124        60
OIR    2025130    131400   -9.1200 -136.9400      23.8        79       122        60
OIR    2025130    131400   -9.1200 -136.9500      23.6        80       120        60
OIR    2025130    131400   -9.1200 -136.9600      23.2        80       119        60
OIR    2025130    131400   -9.1200 -136.9700      22.7        82       117        60
OIR    2025130    131400   -9.1200 -136.9800      22.1        85       116        60
OIR    2025130    131400   -9.1200 -136.9900      21.5        88       115        60
OIR    2025130    131400   -9.1200 -137.0000      21.0        90       114        60
OIR    2025130    131400   -9.1200 -137.0100      20.6        92       114        60
OIR    2025130    131400   -9.1200 -137.0200      20.5        94       115        60
OIR    2025130    131400   -9.1200 -137.0300      20.4        95       116        60
OIR    2025130    131400   -9.1200 -137.0400      20.2        96       116        60
OIR    2025130    131400   -9.1200 -137.0500      19.8        97       115        60
OIR    2025130    131400   -9.1200 -137.0600      19.3        98       113        60
OIR    2025130    131400   -9.1200 -137.0700      19.0        98       111        60
OIR    2025130    131400   -9.1200 -137.0800      18.9        99       111        60
OIR    2025130    131400   -9.1200 -137.0900      18.9        99       112        60
OIR    2025130    131400   -9.1200 -137.1000      18.9        99       113        60
OIR    2025130    131400   -9.1200 -137.1100      18.9        99       112        60
OIR    2025130    131400   -9.1200 -137.1200      18.9        99       112        60
OIR    2025130    131400   -9.1200 -137.1300      18.9        99       113        60
OIR    2025130    131400   -9.1200 -137.1400      18.9        99       113        60
OIR    2025130    131400   -9.1200 -137.1500      18.8        99       113        60
OIR    2025130    131400   -9.1200 -137.1600      18.8        99       112        60
OIR    2025130    131400   -9.1200 -137.1700      18.8        99       111        60
OIR    2025130    131400   -9.1200 -137.1800      18.8        99       111        60
OIR    2025130    131400   -9.1200 -137.1900      18.6        98       112        60
OIR    2025130    131400   -9.1200 -137.2000      18.3        97       113        60
OIR    2025130    131400   -9.1200 -137.2100      17.8        96       114        60
OIR    2025130    131400   -9.1200 -137.2200      17.4        95       114        60
OIR    2025130    131400   -9.1200 -137.2300      16.9        93       114        60
OIR    2025130    131400   -9.1200 -137.2400      16.5        92       114        60
OIR    2025130    131400   -9.1200 -137.2500      15.9        89       112        60
OIR    2025130    131400   -9.1200 -137.2600      15.4        86       110        60
OIR    2025130    131400   -9.1200 -137.2700      15.2        83       112        60
OIR    2025130    131400   -9.1200 -137.2800      15.3        81       113        60
OIR    2025130    131400   -9.1200 -137.2900      15.3        79       107        60
OIR    2025130    131400   -9.1200 -137.3000      15.5        77       104        60
OIR    2025130    131400   -9.1200 -137.3100      15.6        75       103        60
OIR    2025130    131400   -9.1200 -137.3200      15.6        72       103        60
OIR    2025130    131400   -9.1200 -137.3300      15.8        71       103        60
OIR    2025130    131400   -9.1200 -137.3400      15.9        70       103        60
OIR    2025130    131400   -9.1200 -137.3500      16.0        69       103        60
OIR    2025130    131400   -9.1200 -137.3600      16.2        68       103        60
OIR    2025130    131400   -9.1200 -137.3700      16.7        66       103        60
OIR    2025130    131400   -9.1200 -137.3800      17.2        65       103        60
OIR    2025130    131400   -9.1200 -137.3900      17.6        64       103        60
OIR    2025130    131400   -9.1200 -137.4000      17.8        64       103        60
OIR    2025130    131400   -9.1200 -137.4100      18.0        63       103        60
OIR    2025130    131400   -9.1200 -137.4200      18.0        63       103        60
OIR    2025130    131400   -9.1200 -137.4300      17.4        64       103        60
OIR    2025130    131400   -9.1200 -137.4400      15.8        65       103        60
OIR    2025130    131400   -9.1200 -137.4500      14.1        64       103        60
OIR    2025130    131400   -9.1200 -137.4600      12.8        61       103        60
OIR    2025130    131400   -9.1200 -137.4700      11.2        53       103        60
OIR    2025130    131400   -9.1200 -137.4800      10.5        41       103        60
OIR    2025130    131400   -9.1200 -137.4900      11.5        35       103        60
OIR    2025130    131400   -9.1200 -137.5000      13.9        32       103        60
OIR    2025130    131400   -9.1200 -137.5100      14.9        25       103        60
OIR    2025130    131400   -9.1200 -137.5200      16.6        24       103        60
OIR    2025130    131400   -9.1200 -137.5300      17.4        24       103        60
OIR    2025130    131400   -9.1200 -137.5400      17.6        24       103        60
OIR    2025130    131400   -9.1200 -137.5500      17.6        24       103        60
OIR    2025130    131400   -9.1200 -137.5600      17.5        24       103        60
OIR    2025130    131400   -9.1200 -137.5700      17.4        24       103        60
OIR    2025130    131400   -9.1200 -137.5800      17.1        23       103        60
OIR    2025130    131400   -9.1200 -137.5900      16.5        15       103        60
OIR    2025130    131400   -9.1200 -137.6000      16.4        13       103        60
OIR    2025130    131400   -9.1200 -137.6100      16.4        12       103        60
OIR    2025130    131400   -9.1200 -137.6200      16.5        11       103        60
OIR    2025130    131400   -9.1200 -137.6300      16.6        10       103        60
OIR    2025130    131400   -9.1200 -137.6400      17.2         7       103        60
OIR    2025130    131400   -9.1200 -137.6500      17.8         2       103        60
OIR    2025130    131400   -9.1200 -137.6600      18.2       359       103        60
OIR    2025130    131400   -9.1200 -137.6700      18.5       351       107        60
OIR    2025130    131400   -9.1200 -137.6800      18.7       345       112        60
OIR    2025130    131400   -9.1200 -137.6900      18.7       343       119        60
OIR    2025130    131400   -9.1200 -137.7000      18.1       342       127        60
OIR    2025130    131400   -9.1200 -137.7100      17.1       341       135        60
OIR    2025130    131400   -9.1200 -137.7200      15.8       344       143        60
OIR    2025130    131400   -9.1200 -137.7500      11.6       346       141        60
OIR    2025130    131400   -9.1200 -137.7600      10.1       349       137        60
OIR    2025130    131400   -9.1200 -137.7700       7.2       354       133        60
OIR    2025130    131400   -9.1200 -137.8400       4.1       200       141        60
OIR    2025130    131400   -9.1200 -137.8500       4.1       200       139        60
OIR    2025130    131400   -9.1200 -137.8600       4.0       202       136        60
OIR    2025130    131400   -9.1200 -138.1800      18.9        32       129        60
OIR    2025130    131400   -9.1200 -138.1900      20.3        33       114        60
OIR    2025130    131400   -9.1200 -138.2000      20.5        33       109        60
OIR    2025130    131400   -9.1200 -138.2100      20.5        33       104        60
OIR    2025130    131400   -9.1200 -138.2200      20.7        32       103        60
OIR    2025130    131400   -9.1200 -138.2300      21.3        32       103        60
OIR    2025130    131400   -9.1200 -138.2400      21.7        31       103        60
OIR    2025130    131400   -9.1200 -138.2500      21.8        29       103        60
OIR    2025130    131400   -9.1200 -138.2600      21.8        26       103        60
OIR    2025130    131400   -9.1200 -138.2700      21.8        22       103        60
OIR    2025130    131400   -9.1200 -138.2800      21.9        20       103        60
OIR    2025130    131400   -9.1200 -138.2900      22.0        18       103        60
OIR    2025130    131400   -9.1200 -138.3000      22.3        15       103        60
OIR    2025130    131400   -9.1200 -138.3100      22.9        11       103        60
OIR    2025130    131400   -9.1200 -138.3200      24.2         5       103        60
OIR    2025130    131400   -9.1200 -138.3300      25.5         1       103        60
OIR    2025130    131400   -9.1200 -138.3400      25.9       359       103        60
OIR    2025130    131400   -9.1200 -138.3500      26.0       359       103        60
OIR    2025130    131400   -9.1200 -138.3600      26.1       359       103        60
OIR    2025130    131400   -9.1200 -138.3700      26.2       358       103        60
OIR    2025130    131400   -9.1200 -138.3800      26.3       358       103        60
OIR    2025130    131400   -9.1200 -138.3900      26.4       358       103        60
OIR    2025130    131400   -9.1200 -138.4000      26.5       358       103        60
OIR    2025130    131400   -9.1200 -138.4100      26.6       357       103        60
OIR    2025130    131400   -9.1200 -138.4200      26.7       357       103        60
OIR    2025130    131400   -9.1200 -138.4300      26.7       357       103        60
OIR    2025130    131400   -9.1200 -138.4400      26.8       357       103        60
OIR    2025130    131400   -9.1200 -138.4500      26.8       357       103        60
OIR    2025130    131400   -9.1200 -138.4600      26.8       357       103        60
OIR    2025130    131400   -9.1200 -138.4700      26.8       357       103        60
OIR    2025130    131400   -9.1200 -138.4800      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.4900      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5000      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5100      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5200      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5300      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5400      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5500      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5600      26.9       357       103        60
OIR    2025130    131400   -9.1200 -138.5700      26.8       357       104        60
OIR    2025130    131400   -9.1200 -138.5800      26.8       356       104        60
OIR    2025130    131400   -9.1200 -138.5900      26.6       356       104        60
OIR    2025130    131400   -9.1200 -138.6000      26.4       356       104        60
OIR    2025130    131400   -9.1200 -138.6100      26.1       355       104        60
OIR    2025130    131400   -9.1200 -138.6200      25.8       355       104        60
OIR    2025130    131400   -9.1200 -138.6300      25.7       355       103        60
OIR    2025130    131400   -9.1200 -138.6400      25.6       355       103        60
OIR    2025130    131400   -9.1200 -138.6500      25.5       354       103        60
OIR    2025130    131400   -9.1200 -138.6600      25.5       354       103        60
OIR    2025130    131400   -9.1200 -138.6700      25.4       354       103        60
OIR    2025130    131400   -9.1200 -138.6800      25.3       354       103        60
OIR    2025130    131400   -9.1200 -138.6900      25.2       354       103        60
OIR    2025130    131400   -9.1200 -138.7000      24.6       353       104        60
OIR    2025130    131400   -9.1200 -138.7100      23.4       351       104        60
OIR    2025130    131400   -9.1200 -138.7200      22.4       349       104        60
OIR    2025130    131400   -9.1200 -138.7300      21.5       347       105        60
OIR    2025130    131400   -9.1200 -138.7400      20.2       344       107        60
OIR    2025130    131400   -9.1200 -138.7500      19.0       341       108        60
OIR    2025130    131400   -9.1200 -138.7600      18.4       339       109        60
OIR    2025130    131400   -9.1200 -138.7700      18.0       338       111        60
OIR    2025130    131400   -9.1200 -138.7800      17.6       336       113        60
OIR    2025130    131400   -9.1200 -138.7900      17.3       334       116        60
OIR    2025130    131400   -9.1200 -138.8000      16.8       332       120        60
OIR    2025130    131400   -9.1200 -138.8100      16.4       329       123        60
OIR    2025130    131400   -9.1200 -138.8200      16.1       326       124        60
OIR    2025130    131400   -9.1200 -138.8300      15.8       324       126        60
OIR    2025130    131400   -9.1200 -138.8400      15.5       322       126        60
OIR    2025130    131400   -9.1200 -138.8500      15.2       320       125        60
OIR    2025130    131400   -9.1200 -138.8600      15.0       318       127        60
OIR    2025130    131400   -9.1200 -138.8700      14.8       317       128        60
OIR    2025130    131400   -9.1200 -138.8800      14.8       315       129        60
OIR    2025130    131400   -9.1200 -138.8900      14.8       315       130        60
OIR    2025130    131400   -9.1200 -138.9000      14.8       314       131        60
OIR    2025130    131400   -9.1200 -138.9100      14.9       314       130        60
OIR    2025130    131400   -9.1200 -138.9200      14.9       313       129        60
OIR    2025130    131400   -9.1200 -138.9300      14.9       312       130        60
OIR    2025130    131400   -9.1200 -138.9400      14.7       310       131        60
OIR    2025130    131400   -9.1200 -138.9500      14.5       309       132        60
OIR    2025130    131400   -9.1200 -138.9600      12.8       313       134        60
OIR    2025130    131400   -9.1200 -138.9700      11.6       316       140        60
OIR    2025130    131400   -9.1200 -138.9800      11.3       316       146        60
OIR    2025130    131400   -9.1300 -136.3000      39.1        96       142        60
OIR    2025130    131400   -9.1300 -136.3100      39.3        96       139        60
OIR    2025130    131400   -9.1300 -136.3200      39.8        96       139        60
OIR    2025130    131400   -9.1300 -136.3300      40.1        96       139        60
OIR    2025130    131400   -9.1300 -136.3400      40.3        96       143        60
OIR    2025130    131400   -9.1300 -136.5200      36.6       105       140        60
OIR    2025130    131400   -9.1300 -136.5300      36.2       104       135        60
OIR    2025130    131400   -9.1300 -136.5400      36.0       103       134        60
OIR    2025130    131400   -9.1300 -136.5500      35.7       103       133        60
OIR    2025130    131400   -9.1300 -136.5600      35.4       103       132        60
OIR    2025130    131400   -9.1300 -136.5700      35.0       102       131        60
OIR    2025130    131400   -9.1300 -136.5800      34.3       102       131        60
OIR    2025130    131400   -9.1300 -136.5900      33.7       101       131        60
OIR    2025130    131400   -9.1300 -136.6000      33.0       101       132        60
OIR    2025130    131400   -9.1300 -136.6100      32.3       100       132        60
OIR    2025130    131400   -9.1300 -136.6200      31.6       100       133        60
OIR    2025130    131400   -9.1300 -136.6300      30.9       100       133        60
OIR    2025130    131400   -9.1300 -136.6400      30.8       100       132        60
OIR    2025130    131400   -9.1300 -136.6500      30.7        99       131        60
OIR    2025130    131400   -9.1300 -136.6600      30.8        99       130        60
OIR    2025130    131400   -9.1300 -136.6700      30.8        98       129        60
OIR    2025130    131400   -9.1300 -136.6800      30.8        97       127        60
OIR    2025130    131400   -9.1300 -136.6900      30.9        96       124        60
OIR    2025130    131400   -9.1300 -136.7000      30.8        94       121        60
OIR    2025130    131400   -9.1300 -136.7100      30.2        92       119        60
OIR    2025130    131400   -9.1300 -136.7200      30.1        91       121        60
OIR    2025130    131400   -9.1300 -136.7300      29.4        90       124        60
OIR    2025130    131400   -9.1300 -136.7400      29.3        90       117        60
OIR    2025130    131400   -9.1300 -136.7500      29.2        90       115        60
OIR    2025130    131400   -9.1300 -136.7600      29.1        89       113        60
OIR    2025130    131400   -9.1300 -136.7700      28.9        89       112        60
OIR    2025130    131400   -9.1300 -136.7800      28.7        89       114        60
OIR    2025130    131400   -9.1300 -136.7900      28.6        89       116        60
OIR    2025130    131400   -9.1300 -136.8000      28.4        88       119        60
OIR    2025130    131400   -9.1300 -136.8100      26.8        85       117        60
OIR    2025130    131400   -9.1300 -136.8200      26.0        83       117        60
OIR    2025130    131400   -9.1300 -136.8300      25.3        81       117        60
OIR    2025130    131400   -9.1300 -136.8400      24.9        80       117        60
OIR    2025130    131400   -9.1300 -136.8500      24.7        79       117        60
OIR    2025130    131400   -9.1300 -136.8600      24.6        79       119        60
OIR    2025130    131400   -9.1300 -136.8700      24.5        79       120        60
OIR    2025130    131400   -9.1300 -136.8800      24.5        79       122        60
OIR    2025130    131400   -9.1300 -136.8900      24.5        79       123        60
OIR    2025130    131400   -9.1300 -136.9000      24.5        79       123        60
OIR    2025130    131400   -9.1300 -136.9100      24.5        79       122        60
OIR    2025130    131400   -9.1300 -136.9200      24.5        79       123        60
OIR    2025130    131400   -9.1300 -136.9300      24.5        79       123        60
OIR    2025130    131400   -9.1300 -136.9400      24.4        79       121        60
OIR    2025130    131400   -9.1300 -136.9500      24.3        79       119        60
OIR    2025130    131400   -9.1300 -136.9600      24.2        79       116        60
OIR    2025130    131400   -9.1300 -136.9700      24.0        80       116        60
OIR    2025130    131400   -9.1300 -136.9800      23.5        82       115        60
OIR    2025130    131400   -9.1300 -136.9900      22.7        85       114        60
OIR    2025130    131400   -9.1300 -137.0000      21.8        87       114        60
OIR    2025130    131400   -9.1300 -137.0100      21.3        90       114        60
OIR    2025130    131400   -9.1300 -137.0200      21.1        92       115        60
OIR    2025130    131400   -9.1300 -137.0300      20.9        93       116        60
OIR    2025130    131400   -9.1300 -137.0400      20.7        94       116        60
OIR    2025130    131400   -9.1300 -137.0500      20.2        95       114        60
OIR    2025130    131400   -9.1300 -137.0600      19.7        96       111        60
OIR    2025130    131400   -9.1300 -137.0700      19.1        97       112        60
OIR    2025130    131400   -9.1300 -137.0800      19.0        98       112        60
OIR    2025130    131400   -9.1300 -137.0900      18.9        99       114        60
OIR    2025130    131400   -9.1300 -137.1000      18.9        99       114        60
OIR    2025130    131400   -9.1300 -137.1100      18.9        99       113        60
OIR    2025130    131400   -9.1300 -137.1200      18.9        99       113        60
OIR    2025130    131400   -9.1300 -137.1300      18.9        99       113        60
OIR    2025130    131400   -9.1300 -137.1400      18.9        99       112        60
OIR    2025130    131400   -9.1300 -137.1500      18.9        99       112        60
OIR    2025130    131400   -9.1300 -137.1600      18.9        99       111        60
OIR    2025130    131400   -9.1300 -137.1700      18.9        99       110        60
OIR    2025130    131400   -9.1300 -137.1800      18.8        98       110        60
OIR    2025130    131400   -9.1300 -137.1900      18.7        97       111        60
OIR    2025130    131400   -9.1300 -137.2000      18.4        96       113        60
OIR    2025130    131400   -9.1300 -137.2100      17.9        95       114        60
OIR    2025130    131400   -9.1300 -137.2200      17.5        93       113        60
OIR    2025130    131400   -9.1300 -137.2300      17.1        92       113        60
OIR    2025130    131400   -9.1300 -137.2400      16.6        90       113        60
OIR    2025130    131400   -9.1300 -137.2500      16.0        87       111        60
OIR    2025130    131400   -9.1300 -137.2600      15.6        84       110        60
OIR    2025130    131400   -9.1300 -137.2700      15.4        81       111        60
OIR    2025130    131400   -9.1300 -137.2800      15.6        79       111        60
OIR    2025130    131400   -9.1300 -137.2900      15.7        77       105        60
OIR    2025130    131400   -9.1300 -137.3000      15.8        75       104        60
OIR    2025130    131400   -9.1300 -137.3100      16.0        73       103        60
OIR    2025130    131400   -9.1300 -137.3200      15.9        72       103        60
OIR    2025130    131400   -9.1300 -137.3300      16.0        70       103        60
OIR    2025130    131400   -9.1300 -137.3400      16.1        69       103        60
OIR    2025130    131400   -9.1300 -137.3500      16.1        68       103        60
OIR    2025130    131400   -9.1300 -137.3600      16.3        67       103        60
OIR    2025130    131400   -9.1300 -137.3700      16.9        65       103        60
OIR    2025130    131400   -9.1300 -137.3800      17.5        64       103        60
OIR    2025130    131400   -9.1300 -137.3900      17.7        63       103        60
OIR    2025130    131400   -9.1300 -137.4000      17.9        63       103        60
OIR    2025130    131400   -9.1300 -137.4100      18.0        63       103        60
OIR    2025130    131400   -9.1300 -137.4200      18.1        63       103        60
OIR    2025130    131400   -9.1300 -137.4300      17.9        63       103        60
OIR    2025130    131400   -9.1300 -137.4400      16.8        62       103        60
OIR    2025130    131400   -9.1300 -137.4500      14.9        60       103        60
OIR    2025130    131400   -9.1300 -137.4600      13.6        57       103        60
OIR    2025130    131400   -9.1300 -137.4700      12.0        45       103        60
OIR    2025130    131400   -9.1300 -137.4800      12.1        33       103        60
OIR    2025130    131400   -9.1300 -137.4900      13.6        27       103        60
OIR    2025130    131400   -9.1300 -137.5000      15.6        27       103        60
OIR    2025130    131400   -9.1300 -137.5100      16.2        24       103        60
OIR    2025130    131400   -9.1300 -137.5200      17.3        24       103        60
OIR    2025130    131400   -9.1300 -137.5300      17.6        24       103        60
OIR    2025130    131400   -9.1300 -137.5400      17.7        24       103        60
OIR    2025130    131400   -9.1300 -137.5500      17.7        24       103        60
OIR    2025130    131400   -9.1300 -137.5600      17.6        24       103        60
OIR    2025130    131400   -9.1300 -137.5700      17.5        23       103        60
OIR    2025130    131400   -9.1300 -137.5800      16.9        19       103        60
OIR    2025130    131400   -9.1300 -137.5900      16.5        14       103        60
OIR    2025130    131400   -9.1300 -137.6000      16.5        13       103        60
OIR    2025130    131400   -9.1300 -137.6100      16.5        12       103        60
OIR    2025130    131400   -9.1300 -137.6200      16.6        11       103        60
OIR    2025130    131400   -9.1300 -137.6300      16.9        10       103        60
OIR    2025130    131400   -9.1300 -137.6400      17.7         5       103        60
OIR    2025130    131400   -9.1300 -137.6500      18.4       359       103        60
OIR    2025130    131400   -9.1300 -137.6600      18.8       356       103        60
OIR    2025130    131400   -9.1300 -137.6700      19.1       352       109        60
OIR    2025130    131400   -9.1300 -137.6800      19.1       349       116        60
OIR    2025130    131400   -9.1300 -137.6900      18.9       348       120        60
OIR    2025130    131400   -9.1300 -137.7000      18.1       347       125        60
OIR    2025130    131400   -9.1300 -137.7100      16.1       343       131        60
OIR    2025130    131400   -9.1300 -137.7200      15.3       343       139        60
OIR    2025130    131400   -9.1300 -137.7300      15.0       341       148        60
OIR    2025130    131400   -9.1300 -137.7400      13.9       342       148        60
OIR    2025130    131400   -9.1300 -137.7500      12.5       347       142        60
OIR    2025130    131400   -9.1300 -137.7600      11.7       349       138        60
OIR    2025130    131400   -9.1300 -137.7700       9.2       353       135        60
OIR    2025130    131400   -9.1300 -137.7800       6.0       356       132        60
OIR    2025130    131400   -9.1300 -137.9000       4.0       245       142        60
OIR    2025130    131400   -9.1300 -137.9100       4.0       245       144        60
OIR    2025130    131400   -9.1300 -137.9200       4.1       247       146        60
OIR    2025130    131400   -9.1300 -137.9300       4.2       250       147        60
OIR    2025130    131400   -9.1300 -138.1800      19.0        34       133        60
OIR    2025130    131400   -9.1300 -138.1900      20.5        33       115        60
OIR    2025130    131400   -9.1300 -138.2000      20.5        33       110        60
OIR    2025130    131400   -9.1300 -138.2100      20.5        33       104        60
OIR    2025130    131400   -9.1300 -138.2200      20.8        33       103        60
OIR    2025130    131400   -9.1300 -138.2300      21.8        32       103        60
OIR    2025130    131400   -9.1300 -138.2400      22.2        31       103        60
OIR    2025130    131400   -9.1300 -138.2500      22.4        29       103        60
OIR    2025130    131400   -9.1300 -138.2600      22.2        26       103        60
OIR    2025130    131400   -9.1300 -138.2700      22.1        22       103        60
OIR    2025130    131400   -9.1300 -138.2800      22.1        19       103        60
OIR    2025130    131400   -9.1300 -138.2900      22.3        16       103        60
OIR    2025130    131400   -9.1300 -138.3000      22.5        14       103        60
OIR    2025130    131400   -9.1300 -138.3100      23.2         9       103        60
OIR    2025130    131400   -9.1300 -138.3200      24.6         4       103        60
OIR    2025130    131400   -9.1300 -138.3300      25.8         0       103        60
OIR    2025130    131400   -9.1300 -138.3400      26.0       360       103        60
OIR    2025130    131400   -9.1300 -138.3500      26.2       359       103        60
OIR    2025130    131400   -9.1300 -138.3600      26.3       359       103        60
OIR    2025130    131400   -9.1300 -138.3700      26.4       359       103        60
OIR    2025130    131400   -9.1300 -138.3800      26.5       358       103        60
OIR    2025130    131400   -9.1300 -138.3900      26.5       358       103        60
OIR    2025130    131400   -9.1300 -138.4000      26.6       358       103        60
OIR    2025130    131400   -9.1300 -138.4100      26.7       358       103        60
OIR    2025130    131400   -9.1300 -138.4200      26.7       357       103        60
OIR    2025130    131400   -9.1300 -138.4300      26.8       357       103        60
OIR    2025130    131400   -9.1300 -138.4400      26.8       357       103        60
OIR    2025130    131400   -9.1300 -138.4500      26.8       357       103        60
OIR    2025130    131400   -9.1300 -138.4600      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.4700      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.4800      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.4900      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.5000      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5100      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5200      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5300      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5400      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5500      27.0       357       103        60
OIR    2025130    131400   -9.1300 -138.5600      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.5700      26.9       357       103        60
OIR    2025130    131400   -9.1300 -138.5800      26.8       356       103        60
OIR    2025130    131400   -9.1300 -138.5900      26.7       356       103        60
OIR    2025130    131400   -9.1300 -138.6000      26.6       356       103        60
OIR    2025130    131400   -9.1300 -138.6100      26.3       355       103        60
OIR    2025130    131400   -9.1300 -138.6200      25.9       355       103        60
OIR    2025130    131400   -9.1300 -138.6300      25.7       355       103        60
OIR    2025130    131400   -9.1300 -138.6400      25.6       354       103        60
OIR    2025130    131400   -9.1300 -138.6500      25.6       354       103        60
OIR    2025130    131400   -9.1300 -138.6600      25.5       354       103        60
OIR    2025130    131400   -9.1300 -138.6700      25.4       354       103        60
OIR    2025130    131400   -9.1300 -138.6800      25.3       354       103        60
OIR    2025130    131400   -9.1300 -138.6900      25.2       354       103        60
OIR    2025130    131400   -9.1300 -138.7000      24.9       354       103        60
OIR    2025130    131400   -9.1300 -138.7100      23.9       352       104        60
OIR    2025130    131400   -9.1300 -138.7200      22.7       350       104        60
OIR    2025130    131400   -9.1300 -138.7300      21.5       347       104        60
OIR    2025130    131400   -9.1300 -138.7400      20.4       344       105        60
OIR    2025130    131400   -9.1300 -138.7500      19.4       341       108        60
OIR    2025130    131400   -9.1300 -138.7600      18.8       339       109        60
OIR    2025130    131400   -9.1300 -138.7700      18.3       337       112        60
OIR    2025130    131400   -9.1300 -138.7800      17.8       335       115        60
OIR    2025130    131400   -9.1300 -138.7900      17.3       333       117        60
OIR    2025130    131400   -9.1300 -138.8000      16.9       330       120        60
OIR    2025130    131400   -9.1300 -138.8100      16.5       327       122        60
OIR    2025130    131400   -9.1300 -138.8200      16.2       325       124        60
OIR    2025130    131400   -9.1300 -138.8300      16.0       323       125        60
OIR    2025130    131400   -9.1300 -138.8400      15.7       321       125        60
OIR    2025130    131400   -9.1300 -138.8500      15.3       319       124        60
OIR    2025130    131400   -9.1300 -138.8600      15.0       318       127        60
OIR    2025130    131400   -9.1300 -138.8700      14.9       316       129        60
OIR    2025130    131400   -9.1300 -138.8800      14.9       315       131        60
OIR    2025130    131400   -9.1300 -138.8900      14.8       315       132        60
OIR    2025130    131400   -9.1300 -138.9000      14.9       314       132        60
OIR    2025130    131400   -9.1300 -138.9100      14.9       314       131        60
OIR    2025130    131400   -9.1300 -138.9200      14.9       314       131        60
OIR    2025130    131400   -9.1300 -138.9300      14.9       313       131        60
OIR    2025130    131400   -9.1300 -138.9400      14.8       313       131        60
OIR    2025130    131400   -9.1300 -138.9500      14.3       311       132        60
OIR    2025130    131400   -9.1300 -138.9600      12.2       315       134        60
OIR    2025130    131400   -9.1300 -138.9700      11.5       316       137        60
OIR    2025130    131400   -9.1300 -138.9800      11.4       316       142        60
OIR    2025130    131400   -9.1400 -136.2800      38.8        95       144        60
OIR    2025130    131400   -9.1400 -136.3000      39.2        96       140        60
OIR    2025130    131400   -9.1400 -136.3100      39.3        96       138        60
OIR    2025130    131400   -9.1400 -136.3200      39.9        96       138        60
OIR    2025130    131400   -9.1400 -136.3300      40.2        96       139        60
OIR    2025130    131400   -9.1400 -136.3400      40.4        96       143        60
OIR    2025130    131400   -9.1400 -136.5200      36.3       103       140        60
OIR    2025130    131400   -9.1400 -136.5300      36.1       103       134        60
OIR    2025130    131400   -9.1400 -136.5400      35.9       102       132        60
OIR    2025130    131400   -9.1400 -136.5500      35.6       102       130        60
OIR    2025130    131400   -9.1400 -136.5600      35.1       102       130        60
OIR    2025130    131400   -9.1400 -136.5700      34.6       101       130        60
OIR    2025130    131400   -9.1400 -136.5800      34.0       101       131        60
OIR    2025130    131400   -9.1400 -136.5900      33.3       100       131        60
OIR    2025130    131400   -9.1400 -136.6000      32.7       100       130        60
OIR    2025130    131400   -9.1400 -136.6100      31.9       100       131        60
OIR    2025130    131400   -9.1400 -136.6200      31.2       100       132        60
OIR    2025130    131400   -9.1400 -136.6300      30.7        99       132        60
OIR    2025130    131400   -9.1400 -136.6400      30.5        99       132        60
OIR    2025130    131400   -9.1400 -136.6500      30.4        98       131        60
OIR    2025130    131400   -9.1400 -136.6600      30.4        98       129        60
OIR    2025130    131400   -9.1400 -136.6700      30.4        97       128        60
OIR    2025130    131400   -9.1400 -136.6800      30.4        96       126        60
OIR    2025130    131400   -9.1400 -136.6900      30.5        94       123        60
OIR    2025130    131400   -9.1400 -136.7000      30.4        93       121        60
OIR    2025130    131400   -9.1400 -136.7100      30.1        91       117        60
OIR    2025130    131400   -9.1400 -136.7200      29.9        90       121        60
OIR    2025130    131400   -9.1400 -136.7300      29.4        90       125        60
OIR    2025130    131400   -9.1400 -136.7400      29.2        89       120        60
OIR    2025130    131400   -9.1400 -136.7500      29.2        89       116        60
OIR    2025130    131400   -9.1400 -136.7600      29.0        89       114        60
OIR    2025130    131400   -9.1400 -136.7700      28.8        89       113        60
OIR    2025130    131400   -9.1400 -136.7800      28.6        88       115        60
OIR    2025130    131400   -9.1400 -136.7900      28.5        88       116        60
OIR    2025130    131400   -9.1400 -136.8000      28.0        87       119        60
OIR    2025130    131400   -9.1400 -136.8100      26.4        83       117        60
OIR    2025130    131400   -9.1400 -136.8200      25.7        81       116        60
OIR    2025130    131400   -9.1400 -136.8300      25.2        80       116        60
OIR    2025130    131400   -9.1400 -136.8400      24.8        79       116        60
OIR    2025130    131400   -9.1400 -136.8500      24.7        79       116        60
OIR    2025130    131400   -9.1400 -136.8600      24.6        78       117        60
OIR    2025130    131400   -9.1400 -136.8700      24.6        78       120        60
OIR    2025130    131400   -9.1400 -136.8800      24.6        78       122        60
OIR    2025130    131400   -9.1400 -136.8900      24.6        78       122        60
OIR    2025130    131400   -9.1400 -136.9000      24.7        78       122        60
OIR    2025130    131400   -9.1400 -136.9100      24.7        78       122        60
OIR    2025130    131400   -9.1400 -136.9200      24.7        78       122        60
OIR    2025130    131400   -9.1400 -136.9300      24.8        78       123        60
OIR    2025130    131400   -9.1400 -136.9400      24.7        78       121        60
OIR    2025130    131400   -9.1400 -136.9500      24.7        78       117        60
OIR    2025130    131400   -9.1400 -136.9600      24.7        79       116        60
OIR    2025130    131400   -9.1400 -136.9700      24.6        79       114        60
OIR    2025130    131400   -9.1400 -136.9800      24.4        79       114        60
OIR    2025130    131400   -9.1400 -136.9900      24.0        81       114        60
OIR    2025130    131400   -9.1400 -137.0000      23.2        83       114        60
OIR    2025130    131400   -9.1400 -137.0100      22.5        86       114        60
OIR    2025130    131400   -9.1400 -137.0200      22.1        88       115        60
OIR    2025130    131400   -9.1400 -137.0300      21.7        90       115        60
OIR    2025130    131400   -9.1400 -137.0400      21.3        92       114        60
OIR    2025130    131400   -9.1400 -137.0500      20.8        93       113        60
OIR    2025130    131400   -9.1400 -137.0600      20.3        94       111        60
OIR    2025130    131400   -9.1400 -137.0700      19.5        95       112        60
OIR    2025130    131400   -9.1400 -137.0800      19.1        97       113        60
OIR    2025130    131400   -9.1400 -137.0900      19.0        98       115        60
OIR    2025130    131400   -9.1400 -137.1000      18.9        98       115        60
OIR    2025130    131400   -9.1400 -137.1100      18.9        99       114        60
OIR    2025130    131400   -9.1400 -137.1200      18.9        99       114        60
OIR    2025130    131400   -9.1400 -137.1300      18.9        99       114        60
OIR    2025130    131400   -9.1400 -137.1400      18.9        99       112        60
OIR    2025130    131400   -9.1400 -137.1500      18.9        99       111        60
OIR    2025130    131400   -9.1400 -137.1600      18.9        98       110        60
OIR    2025130    131400   -9.1400 -137.1700      18.9        98       109        60
OIR    2025130    131400   -9.1400 -137.1800      18.9        97       110        60
OIR    2025130    131400   -9.1400 -137.1900      18.8        96       111        60
OIR    2025130    131400   -9.1400 -137.2000      18.5        95       113        60
OIR    2025130    131400   -9.1400 -137.2100      18.0        93       113        60
OIR    2025130    131400   -9.1400 -137.2200      17.6        92       113        60
OIR    2025130    131400   -9.1400 -137.2300      17.3        90       112        60
OIR    2025130    131400   -9.1400 -137.2400      16.8        88       112        60
OIR    2025130    131400   -9.1400 -137.2500      16.2        85       111        60
OIR    2025130    131400   -9.1400 -137.2600      15.8        82       109        60
OIR    2025130    131400   -9.1400 -137.2700      15.7        80       109        60
OIR    2025130    131400   -9.1400 -137.2800      15.9        77       109        60
OIR    2025130    131400   -9.1400 -137.2900      16.0        76       104        60
OIR    2025130    131400   -9.1400 -137.3000      16.1        74       103        60
OIR    2025130    131400   -9.1400 -137.3100      16.2        72       103        60
OIR    2025130    131400   -9.1400 -137.3200      16.1        71       103        60
OIR    2025130    131400   -9.1400 -137.3300      16.2        70       103        60
OIR    2025130    131400   -9.1400 -137.3400      16.3        69       103        60
OIR    2025130    131400   -9.1400 -137.3500      16.3        68       103        60
OIR    2025130    131400   -9.1400 -137.3600      16.5        66       103        60
OIR    2025130    131400   -9.1400 -137.3700      17.0        65       103        60
OIR    2025130    131400   -9.1400 -137.3800      17.7        64       103        60
OIR    2025130    131400   -9.1400 -137.3900      17.9        63       103        60
OIR    2025130    131400   -9.1400 -137.4000      18.0        63       103        60
OIR    2025130    131400   -9.1400 -137.4100      18.1        63       103        60
OIR    2025130    131400   -9.1400 -137.4200      18.1        63       103        60
OIR    2025130    131400   -9.1400 -137.4300      18.0        62       103        60
OIR    2025130    131400   -9.1400 -137.4400      17.2        61       103        60
OIR    2025130    131400   -9.1400 -137.4500      15.6        58       103        60
OIR    2025130    131400   -9.1400 -137.4600      14.6        55       103        60
OIR    2025130    131400   -9.1400 -137.4700      13.0        40       103        60
OIR    2025130    131400   -9.1400 -137.4800      13.5        29       103        60
OIR    2025130    131400   -9.1400 -137.4900      15.0        25       103        60
OIR    2025130    131400   -9.1400 -137.5000      16.5        25       103        60
OIR    2025130    131400   -9.1400 -137.5100      16.8        25       103        60
OIR    2025130    131400   -9.1400 -137.5200      17.6        24       104        60
OIR    2025130    131400   -9.1400 -137.5300      17.7        24       104        60
OIR    2025130    131400   -9.1400 -137.5400      17.7        24       104        60
OIR    2025130    131400   -9.1400 -137.5500      17.7        24       103        60
OIR    2025130    131400   -9.1400 -137.5600      17.6        24       103        60
OIR    2025130    131400   -9.1400 -137.5700      17.5        23       103        60
OIR    2025130    131400   -9.1400 -137.5800      16.9        17       103        60
OIR    2025130    131400   -9.1400 -137.5900      16.5        14       103        60
OIR    2025130    131400   -9.1400 -137.6000      16.5        13       103        60
OIR    2025130    131400   -9.1400 -137.6100      16.5        12       103        60
OIR    2025130    131400   -9.1400 -137.6200      16.6        11       103        60
OIR    2025130    131400   -9.1400 -137.6300      17.1         9       104        60
OIR    2025130    131400   -9.1400 -137.6400      18.0         4       104        60
OIR    2025130    131400   -9.1400 -137.6500      18.8       358       104        60
OIR    2025130    131400   -9.1400 -137.6600      19.0       354       105        60
OIR    2025130    131400   -9.1400 -137.6700      19.0       352       112        60
OIR    2025130    131400   -9.1400 -137.6800      19.0       351       119        60
OIR    2025130    131400   -9.1400 -137.6900      18.8       349       124        60
OIR    2025130    131400   -9.1400 -137.7000      18.4       348       130        60
OIR    2025130    131400   -9.1400 -137.7100      15.8       343       135        60
OIR    2025130    131400   -9.1400 -137.7200      15.1       342       140        60
OIR    2025130    131400   -9.1400 -137.7300      15.0       342       146        60
OIR    2025130    131400   -9.1400 -137.7400      14.0       344       147        60
OIR    2025130    131400   -9.1400 -137.7500      13.3       347       143        60
OIR    2025130    131400   -9.1400 -137.7600      12.8       348       140        60
OIR    2025130    131400   -9.1400 -137.7700      11.2       349       136        60
OIR    2025130    131400   -9.1400 -137.7800       8.0       343       134        60
OIR    2025130    131400   -9.1400 -137.9000       4.1       255       137        60
OIR    2025130    131400   -9.1400 -137.9100       4.2       254       139        60
OIR    2025130    131400   -9.1400 -137.9200       4.4       252       141        60
OIR    2025130    131400   -9.1400 -137.9300       4.7       253       143        60
OIR    2025130    131400   -9.1400 -137.9400       5.1       256       144        60
OIR    2025130    131400   -9.1400 -137.9500       5.5       264       145        60
OIR    2025130    131400   -9.1400 -138.1900      20.6        33       134        60
OIR    2025130    131400   -9.1400 -138.2000      20.5        33       119        60
OIR    2025130    131400   -9.1400 -138.2100      20.4        33       104        60
OIR    2025130    131400   -9.1400 -138.2200      20.5        33       103        60
OIR    2025130    131400   -9.1400 -138.2300      22.2        32       103        60
OIR    2025130    131400   -9.1400 -138.2400      22.6        31       103        60
OIR    2025130    131400   -9.1400 -138.2500      22.8        29       103        60
OIR    2025130    131400   -9.1400 -138.2600      22.7        27       103        60
OIR    2025130    131400   -9.1400 -138.2700      22.4        21       103        60
OIR    2025130    131400   -9.1400 -138.2800      22.4        18       103        60
OIR    2025130    131400   -9.1400 -138.2900      22.6        15       103        60
OIR    2025130    131400   -9.1400 -138.3000      22.8        12       103        60
OIR    2025130    131400   -9.1400 -138.3100      23.6         7       103        60
OIR    2025130    131400   -9.1400 -138.3200      24.9         3       103        60
OIR    2025130    131400   -9.1400 -138.3300      25.9         0       103        60
OIR    2025130    131400   -9.1400 -138.3400      26.2       360       103        60
OIR    2025130    131400   -9.1400 -138.3500      26.3       360       103        60
OIR    2025130    131400   -9.1400 -138.3600      26.4       359       103        60
OIR    2025130    131400   -9.1400 -138.3700      26.5       359       103        60
OIR    2025130    131400   -9.1400 -138.3800      26.6       359       103        60
OIR    2025130    131400   -9.1400 -138.3900      26.7       358       103        60
OIR    2025130    131400   -9.1400 -138.4000      26.7       358       103        60
OIR    2025130    131400   -9.1400 -138.4100      26.8       358       103        60
OIR    2025130    131400   -9.1400 -138.4200      26.8       357       103        60
OIR    2025130    131400   -9.1400 -138.4300      26.9       357       103        60
OIR    2025130    131400   -9.1400 -138.4400      26.9       357       103        60
OIR    2025130    131400   -9.1400 -138.4500      26.9       357       103        60
OIR    2025130    131400   -9.1400 -138.4600      26.9       357       103        60
OIR    2025130    131400   -9.1400 -138.4700      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.4800      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.4900      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5000      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5100      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5200      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5300      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5400      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5500      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5600      27.0       357       103        60
OIR    2025130    131400   -9.1400 -138.5700      27.0       356       103        60
OIR    2025130    131400   -9.1400 -138.5800      26.9       356       103        60
OIR    2025130    131400   -9.1400 -138.5900      26.8       356       103        60
OIR    2025130    131400   -9.1400 -138.6000      26.7       356       103        60
OIR    2025130    131400   -9.1400 -138.6100      26.4       355       103        60
OIR    2025130    131400   -9.1400 -138.6200      26.0       355       104        60
OIR    2025130    131400   -9.1400 -138.6300      25.8       354       104        60
OIR    2025130    131400   -9.1400 -138.6400      25.7       354       104        60
OIR    2025130    131400   -9.1400 -138.6500      25.6       354       104        60
OIR    2025130    131400   -9.1400 -138.6600      25.5       354       104        60
OIR    2025130    131400   -9.1400 -138.6700      25.4       354       104        60
OIR    2025130    131400   -9.1400 -138.6800      25.3       354       104        60
OIR    2025130    131400   -9.1400 -138.6900      25.2       354       104        60
OIR    2025130    131400   -9.1400 -138.7000      24.9       354       103        60
OIR    2025130    131400   -9.1400 -138.7100      24.0       352       103        60
OIR    2025130    131400   -9.1400 -138.7200      22.8       350       103        60
OIR    2025130    131400   -9.1400 -138.7300      21.8       347       104        60
OIR    2025130    131400   -9.1400 -138.7400      20.8       344       105        60
OIR    2025130    131400   -9.1400 -138.7500      19.9       341       107        60
OIR    2025130    131400   -9.1400 -138.7600      19.3       338       110        60
OIR    2025130    131400   -9.1400 -138.7700      18.7       337       113        60
OIR    2025130    131400   -9.1400 -138.7800      18.1       335       116        60
OIR    2025130    131400   -9.1400 -138.7900      17.5       332       116        60
OIR    2025130    131400   -9.1400 -138.8000      17.1       328       119        60
OIR    2025130    131400   -9.1400 -138.8100      16.8       326       121        60
OIR    2025130    131400   -9.1400 -138.8200      16.5       324       122        60
OIR    2025130    131400   -9.1400 -138.8300      16.2       323       123        60
OIR    2025130    131400   -9.1400 -138.8400      15.9       321       124        60
OIR    2025130    131400   -9.1400 -138.8500      15.4       319       124        60
OIR    2025130    131400   -9.1400 -138.8600      15.1       317       127        60
OIR    2025130    131400   -9.1400 -138.8700      15.0       316       129        60
OIR    2025130    131400   -9.1400 -138.8800      14.9       315       132        60
OIR    2025130    131400   -9.1400 -138.8900      14.9       315       132        60
OIR    2025130    131400   -9.1400 -138.9000      14.9       314       132        60
OIR    2025130    131400   -9.1400 -138.9100      14.9       314       132        60
OIR    2025130    131400   -9.1400 -138.9200      14.9       314       132        60
OIR    2025130    131400   -9.1400 -138.9300      14.9       314       132        60
OIR    2025130    131400   -9.1400 -138.9400      14.8       313       132        60
OIR    2025130    131400   -9.1400 -138.9500      14.2       314       132        60
OIR    2025130    131400   -9.1400 -138.9600      12.0       318       133        60
OIR    2025130    131400   -9.1400 -138.9700      11.5       317       135        60
OIR    2025130    131400   -9.1400 -138.9800      11.4       316       141        60
OIR    2025130    131400   -9.1500 -136.2800      38.9        95       143        60
OIR    2025130    131400   -9.1500 -136.2900      39.0        95       142        60
OIR    2025130    131400   -9.1500 -136.3000      39.3        95       141        60
OIR    2025130    131400   -9.1500 -136.3100      39.4        95       140        60
OIR    2025130    131400   -9.1500 -136.3200      39.9        95       141        60
OIR    2025130    131400   -9.1500 -136.3300      40.2        95       143        60
OIR    2025130    131400   -9.1500 -136.5100      36.6       103       143        60
OIR    2025130    131400   -9.1500 -136.5200      36.2       102       138        60
OIR    2025130    131400   -9.1500 -136.5300      36.0       102       134        60
OIR    2025130    131400   -9.1500 -136.5400      35.8       102       132        60
OIR    2025130    131400   -9.1500 -136.5500      35.4       101       130        60
OIR    2025130    131400   -9.1500 -136.5600      34.9       101       131        60
OIR    2025130    131400   -9.1500 -136.5700      34.4       100       131        60
OIR    2025130    131400   -9.1500 -136.5800      33.7       100       132        60
OIR    2025130    131400   -9.1500 -136.5900      32.9       100       131        60
OIR    2025130    131400   -9.1500 -136.6000      32.1        99       129        60
OIR    2025130    131400   -9.1500 -136.6100      31.5        99       129        60
OIR    2025130    131400   -9.1500 -136.6200      31.0        99       129        60
OIR    2025130    131400   -9.1500 -136.6300      30.6        98       131        60
OIR    2025130    131400   -9.1500 -136.6400      30.2        98       131        60
OIR    2025130    131400   -9.1500 -136.6500      30.0        97       129        60
OIR    2025130    131400   -9.1500 -136.6600      30.0        96       128        60
OIR    2025130    131400   -9.1500 -136.6700      29.9        95       128        60
OIR    2025130    131400   -9.1500 -136.6800      29.8        94       126        60
OIR    2025130    131400   -9.1500 -136.6900      29.9        93       123        60
OIR    2025130    131400   -9.1500 -136.7000      30.1        91       122        60
OIR    2025130    131400   -9.1500 -136.7100      29.9        90       120        60
OIR    2025130    131400   -9.1500 -136.7200      29.8        89       122        60
OIR    2025130    131400   -9.1500 -136.7300      29.5        89       126        60
OIR    2025130    131400   -9.1500 -136.7400      29.2        89       121        60
OIR    2025130    131400   -9.1500 -136.7500      29.0        89       117        60
OIR    2025130    131400   -9.1500 -136.7600      28.9        88       116        60
OIR    2025130    131400   -9.1500 -136.7700      28.5        88       114        60
OIR    2025130    131400   -9.1500 -136.7800      28.3        88       116        60
OIR    2025130    131400   -9.1500 -136.7900      28.0        87       116        60
OIR    2025130    131400   -9.1500 -136.8000      27.3        85       119        60
OIR    2025130    131400   -9.1500 -136.8100      26.0        81       117        60
OIR    2025130    131400   -9.1500 -136.8200      25.5        80       116        60
OIR    2025130    131400   -9.1500 -136.8300      25.1        78       115        60
OIR    2025130    131400   -9.1500 -136.8400      24.8        78       114        60
OIR    2025130    131400   -9.1500 -136.8500      24.7        78       115        60
OIR    2025130    131400   -9.1500 -136.8600      24.7        78       116        60
OIR    2025130    131400   -9.1500 -136.8700      24.7        78       119        60
OIR    2025130    131400   -9.1500 -136.8800      24.7        78       122        60
OIR    2025130    131400   -9.1500 -136.8900      24.8        78       122        60
OIR    2025130    131400   -9.1500 -136.9000      24.8        78       123        60
OIR    2025130    131400   -9.1500 -136.9100      24.9        78       124        60
OIR    2025130    131400   -9.1500 -136.9200      24.9        78       124        60
OIR    2025130    131400   -9.1500 -136.9300      24.9        78       124        60
OIR    2025130    131400   -9.1500 -136.9400      24.9        78       121        60
OIR    2025130    131400   -9.1500 -136.9500      24.9        78       116        60
OIR    2025130    131400   -9.1500 -136.9600      24.9        78       114        60
OIR    2025130    131400   -9.1500 -136.9700      24.8        78       113        60
OIR    2025130    131400   -9.1500 -136.9800      24.7        79       113        60
OIR    2025130    131400   -9.1500 -136.9900      24.5        79       113        60
OIR    2025130    131400   -9.1500 -137.0000      24.2        80       114        60
OIR    2025130    131400   -9.1500 -137.0100      23.6        82       114        60
OIR    2025130    131400   -9.1500 -137.0200      23.0        84       113        60
OIR    2025130    131400   -9.1500 -137.0300      22.4        86       112        60
OIR    2025130    131400   -9.1500 -137.0400      21.8        88       111        60
OIR    2025130    131400   -9.1500 -137.0500      21.3        89       111        60
OIR    2025130    131400   -9.1500 -137.0600      20.9        91       110        60
OIR    2025130    131400   -9.1500 -137.0700      20.1        92       112        60
OIR    2025130    131400   -9.1500 -137.0800      19.6        94       113        60
OIR    2025130    131400   -9.1500 -137.0900      19.2        96       115        60
OIR    2025130    131400   -9.1500 -137.1000      19.1        97       115        60
OIR    2025130    131400   -9.1500 -137.1100      19.0        98       114        60
OIR    2025130    131400   -9.1500 -137.1200      18.9        98       114        60
OIR    2025130    131400   -9.1500 -137.1300      18.9        98       114        60
OIR    2025130    131400   -9.1500 -137.1400      18.9        98       113        60
OIR    2025130    131400   -9.1500 -137.1500      19.0        98       111        60
OIR    2025130    131400   -9.1500 -137.1600      19.0        98       111        60
OIR    2025130    131400   -9.1500 -137.1700      19.0        97       111        60
OIR    2025130    131400   -9.1500 -137.1800      19.0        96       112        60
OIR    2025130    131400   -9.1500 -137.1900      18.9        95       113        60
OIR    2025130    131400   -9.1500 -137.2000      18.7        93       114        60
OIR    2025130    131400   -9.1500 -137.2100      18.3        92       113        60
OIR    2025130    131400   -9.1500 -137.2200      17.9        90       112        60
OIR    2025130    131400   -9.1500 -137.2300      17.5        88       112        60
OIR    2025130    131400   -9.1500 -137.2400      17.0        86       112        60
OIR    2025130    131400   -9.1500 -137.2500      16.5        83       110        60
OIR    2025130    131400   -9.1500 -137.2600      16.2        80       108        60
OIR    2025130    131400   -9.1500 -137.2700      16.2        78       108        60
OIR    2025130    131400   -9.1500 -137.2800      16.3        76       107        60
OIR    2025130    131400   -9.1500 -137.2900      16.3        75       104        60
OIR    2025130    131400   -9.1500 -137.3000      16.4        73       103        60
OIR    2025130    131400   -9.1500 -137.3100      16.5        71       103        60
OIR    2025130    131400   -9.1500 -137.3200      16.4        70       103        60
OIR    2025130    131400   -9.1500 -137.3300      16.4        69       103        60
OIR    2025130    131400   -9.1500 -137.3400      16.5        68       103        60
OIR    2025130    131400   -9.1500 -137.3500      16.6        67       103        60
OIR    2025130    131400   -9.1500 -137.3600      16.8        66       103        60
OIR    2025130    131400   -9.1500 -137.3700      17.2        64       103        60
OIR    2025130    131400   -9.1500 -137.3800      17.8        63       103        60
OIR    2025130    131400   -9.1500 -137.3900      18.0        63       103        60
OIR    2025130    131400   -9.1500 -137.4000      18.1        63       103        60
OIR    2025130    131400   -9.1500 -137.4100      18.1        63       103        60
OIR    2025130    131400   -9.1500 -137.4200      18.2        62       103        60
OIR    2025130    131400   -9.1500 -137.4300      18.2        62       103        60
OIR    2025130    131400   -9.1500 -137.4400      17.9        61       103        60
OIR    2025130    131400   -9.1500 -137.4500      16.3        58       103        60
OIR    2025130    131400   -9.1500 -137.4600      15.5        54       103        60
OIR    2025130    131400   -9.1500 -137.4700      14.0        41       103        60
OIR    2025130    131400   -9.1500 -137.4800      14.4        29       103        60
OIR    2025130    131400   -9.1500 -137.4900      15.7        25       103        60
OIR    2025130    131400   -9.1500 -137.5000      16.8        26       103        60
OIR    2025130    131400   -9.1500 -137.5100      17.1        25       104        60
OIR    2025130    131400   -9.1500 -137.5200      17.6        24       105        60
OIR    2025130    131400   -9.1500 -137.5300      17.7        24       110        60
OIR    2025130    131400   -9.1500 -137.5400      17.7        24       107        60
OIR    2025130    131400   -9.1500 -137.5500      17.7        23       104        60
OIR    2025130    131400   -9.1500 -137.5600      17.6        23       103        60
OIR    2025130    131400   -9.1500 -137.5700      17.4        21       103        60
OIR    2025130    131400   -9.1500 -137.5800      16.8        16       103        60
OIR    2025130    131400   -9.1500 -137.5900      16.5        14       103        60
OIR    2025130    131400   -9.1500 -137.6000      16.5        13       103        60
OIR    2025130    131400   -9.1500 -137.6100      16.5        12       103        60
OIR    2025130    131400   -9.1500 -137.6200      16.7        10       103        60
OIR    2025130    131400   -9.1500 -137.6300      17.2         7       104        60
OIR    2025130    131400   -9.1500 -137.6400      18.0         3       109        60
OIR    2025130    131400   -9.1500 -137.6500      18.7       358       111        60
OIR    2025130    131400   -9.1500 -137.6600      18.9       353       112        60
OIR    2025130    131400   -9.1500 -137.6700      18.8       352       116        60
OIR    2025130    131400   -9.1500 -137.6800      18.8       351       121        60
OIR    2025130    131400   -9.1500 -137.6900      18.5       350       130        60
OIR    2025130    131400   -9.1500 -137.7000      17.7       347       137        60
OIR    2025130    131400   -9.1500 -137.7100      15.7       342       141        60
OIR    2025130    131400   -9.1500 -137.7200      15.2       342       144        60
OIR    2025130    131400   -9.1500 -137.7300      15.0       342       145        60
OIR    2025130    131400   -9.1500 -137.7400      14.2       344       145        60
OIR    2025130    131400   -9.1500 -137.7500      13.7       346       144        60
OIR    2025130    131400   -9.1500 -137.7600      13.3       347       141        60
OIR    2025130    131400   -9.1500 -137.7700      12.5       347       138        60
OIR    2025130    131400   -9.1500 -137.7800       9.5       341       136        60
OIR    2025130    131400   -9.1500 -137.7900       4.9       324       135        60
OIR    2025130    131400   -9.1500 -137.8900       4.1       260       131        60
OIR    2025130    131400   -9.1500 -137.9000       4.2       259       133        60
OIR    2025130    131400   -9.1500 -137.9100       4.4       257       134        60
OIR    2025130    131400   -9.1500 -137.9200       4.6       255       136        60
OIR    2025130    131400   -9.1500 -137.9300       5.0       254       139        60
OIR    2025130    131400   -9.1500 -137.9400       5.4       255       141        60
OIR    2025130    131400   -9.1500 -137.9500       5.9       257       140        60
OIR    2025130    131400   -9.1500 -137.9600       6.6       261       142        60
OIR    2025130    131400   -9.1500 -137.9700       7.5       270       146        60
OIR    2025130    131400   -9.1500 -138.2000      20.3        34       127        60
OIR    2025130    131400   -9.1500 -138.2100      20.3        33       104        60
OIR    2025130    131400   -9.1500 -138.2200      20.6        33       104        60
OIR    2025130    131400   -9.1500 -138.2300      22.2        32       103        60
OIR    2025130    131400   -9.1500 -138.2400      22.9        30       103        60
OIR    2025130    131400   -9.1500 -138.2500      23.1        30       103        60
OIR    2025130    131400   -9.1500 -138.2600      23.1        27       103        60
OIR    2025130    131400   -9.1500 -138.2700      22.7        20       103        60
OIR    2025130    131400   -9.1500 -138.2800      22.7        15       103        60
OIR    2025130    131400   -9.1500 -138.2900      22.9        12       103        60
OIR    2025130    131400   -9.1500 -138.3000      23.1        10       103        60
OIR    2025130    131400   -9.1500 -138.3100      23.9         6       103        60
OIR    2025130    131400   -9.1500 -138.3200      25.1         3       103        60
OIR    2025130    131400   -9.1500 -138.3300      26.1         0       103        60
OIR    2025130    131400   -9.1500 -138.3400      26.4       360       103        60
OIR    2025130    131400   -9.1500 -138.3500      26.5       360       103        60
OIR    2025130    131400   -9.1500 -138.3600      26.6       360       103        60
OIR    2025130    131400   -9.1500 -138.3700      26.7       359       103        60
OIR    2025130    131400   -9.1500 -138.3800      26.7       359       103        60
OIR    2025130    131400   -9.1500 -138.3900      26.8       358       103        60
OIR    2025130    131400   -9.1500 -138.4000      26.9       358       103        60
OIR    2025130    131400   -9.1500 -138.4100      27.0       358       103        60
OIR    2025130    131400   -9.1500 -138.4200      27.0       358       103        60
OIR    2025130    131400   -9.1500 -138.4300      27.1       358       103        60
OIR    2025130    131400   -9.1500 -138.4400      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.4500      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.4600      27.0       357       103        60
OIR    2025130    131400   -9.1500 -138.4700      27.0       357       103        60
OIR    2025130    131400   -9.1500 -138.4800      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.4900      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5000      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5100      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5200      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5300      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5400      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5500      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5600      27.1       357       103        60
OIR    2025130    131400   -9.1500 -138.5700      27.0       356       103        60
OIR    2025130    131400   -9.1500 -138.5800      27.0       356       103        60
OIR    2025130    131400   -9.1500 -138.5900      26.9       356       103        60
OIR    2025130    131400   -9.1500 -138.6000      26.8       356       103        60
OIR    2025130    131400   -9.1500 -138.6100      26.5       356       103        60
OIR    2025130    131400   -9.1500 -138.6200      26.1       355       104        60
OIR    2025130    131400   -9.1500 -138.6300      25.9       354       107        60
OIR    2025130    131400   -9.1500 -138.6400      25.7       354       105        60
OIR    2025130    131400   -9.1500 -138.6500      25.6       354       105        60
OIR    2025130    131400   -9.1500 -138.6600      25.4       354       104        60
OIR    2025130    131400   -9.1500 -138.6700      25.3       354       104        60
OIR    2025130    131400   -9.1500 -138.6800      25.2       354       107        60
OIR    2025130    131400   -9.1500 -138.6900      25.0       354       105        60
OIR    2025130    131400   -9.1500 -138.7000      24.6       353       103        60
OIR    2025130    131400   -9.1500 -138.7100      23.9       352       103        60
OIR    2025130    131400   -9.1500 -138.7200      23.0       349       103        60
OIR    2025130    131400   -9.1500 -138.7300      22.0       346       104        60
OIR    2025130    131400   -9.1500 -138.7400      21.2       344       104        60
OIR    2025130    131400   -9.1500 -138.7500      20.4       340       107        60
OIR    2025130    131400   -9.1500 -138.7600      19.7       338       109        60
OIR    2025130    131400   -9.1500 -138.7700      19.1       336       113        60
OIR    2025130    131400   -9.1500 -138.7800      18.5       334       116        60
OIR    2025130    131400   -9.1500 -138.7900      17.8       331       116        60
OIR    2025130    131400   -9.1500 -138.8000      17.3       328       117        60
OIR    2025130    131400   -9.1500 -138.8100      16.9       325       120        60
OIR    2025130    131400   -9.1500 -138.8200      16.7       324       120        60
OIR    2025130    131400   -9.1500 -138.8300      16.5       323       121        60
OIR    2025130    131400   -9.1500 -138.8400      16.1       322       123        60
OIR    2025130    131400   -9.1500 -138.8500      15.5       319       124        60
OIR    2025130    131400   -9.1500 -138.8600      15.2       317       127        60
OIR    2025130    131400   -9.1500 -138.8700      15.1       316       130        60
OIR    2025130    131400   -9.1500 -138.8800      15.0       315       132        60
OIR    2025130    131400   -9.1500 -138.8900      15.0       315       133        60
OIR    2025130    131400   -9.1500 -138.9000      15.0       314       133        60
OIR    2025130    131400   -9.1500 -138.9100      15.0       314       133        60
OIR    2025130    131400   -9.1500 -138.9200      14.9       314       133        60
OIR    2025130    131400   -9.1500 -138.9300      14.9       313       134        60
OIR    2025130    131400   -9.1500 -138.9400      14.8       313       134        60
OIR    2025130    131400   -9.1500 -138.9500      14.1       314       132        60
OIR    2025130    131400   -9.1500 -138.9600      12.0       317       131        60
OIR    2025130    131400   -9.1500 -138.9700      11.6       317       133        60
OIR    2025130    131400   -9.1500 -138.9800      11.5       316       140        60
OIR    2025130    131400   -9.1600 -136.2900      39.1        95       143        60
OIR    2025130    131400   -9.1600 -136.3000      39.3        95       143        60
OIR    2025130    131400   -9.1600 -136.3100      39.6        95       143        60
OIR    2025130    131400   -9.1600 -136.5100      36.4       102       142        60
OIR    2025130    131400   -9.1600 -136.5200      36.1       101       137        60
OIR    2025130    131400   -9.1600 -136.5300      35.9       101       134        60
OIR    2025130    131400   -9.1600 -136.5400      35.6       101       131        60
OIR    2025130    131400   -9.1600 -136.5500      35.2       100       130        60
OIR    2025130    131400   -9.1600 -136.5600      34.7       100       131        60
OIR    2025130    131400   -9.1600 -136.5700      34.1        99       132        60
OIR    2025130    131400   -9.1600 -136.5800      33.4        99       132        60
OIR    2025130    131400   -9.1600 -136.5900      32.5        99       130        60
OIR    2025130    131400   -9.1600 -136.6000      31.7        98       128        60
OIR    2025130    131400   -9.1600 -136.6100      31.2        98       128        60
OIR    2025130    131400   -9.1600 -136.6200      30.8        98       128        60
OIR    2025130    131400   -9.1600 -136.6300      30.4        98       129        60
OIR    2025130    131400   -9.1600 -136.6400      30.0        97       130        60
OIR    2025130    131400   -9.1600 -136.6500      29.6        96       129        60
OIR    2025130    131400   -9.1600 -136.6600      29.3        95       128        60
OIR    2025130    131400   -9.1600 -136.6700      29.2        94       128        60
OIR    2025130    131400   -9.1600 -136.6800      29.2        92       127        60
OIR    2025130    131400   -9.1600 -136.6900      29.4        91       124        60
OIR    2025130    131400   -9.1600 -136.7000      29.6        90       123        60
OIR    2025130    131400   -9.1600 -136.7100      29.6        89       121        60
OIR    2025130    131400   -9.1600 -136.7200      29.4        88       124        60
OIR    2025130    131400   -9.1600 -136.7300      29.4        88       126        60
OIR    2025130    131400   -9.1600 -136.7400      29.1        87       123        60
OIR    2025130    131400   -9.1600 -136.7500      28.7        87       120        60
OIR    2025130    131400   -9.1600 -136.7600      28.5        87       117        60
OIR    2025130    131400   -9.1600 -136.7700      28.1        87       116        60
OIR    2025130    131400   -9.1600 -136.7800      27.5        86       116        60
OIR    2025130    131400   -9.1600 -136.7900      26.9        84       116        60
OIR    2025130    131400   -9.1600 -136.8000      26.3        82       117        60
OIR    2025130    131400   -9.1600 -136.8100      25.6        79       116        60
OIR    2025130    131400   -9.1600 -136.8200      25.3        78       115        60
OIR    2025130    131400   -9.1600 -136.8300      25.0        77       114        60
OIR    2025130    131400   -9.1600 -136.8400      24.8        77       113        60
OIR    2025130    131400   -9.1600 -136.8500      24.8        77       114        60
OIR    2025130    131400   -9.1600 -136.8600      24.7        78       116        60
OIR    2025130    131400   -9.1600 -136.8700      24.8        78       120        60
OIR    2025130    131400   -9.1600 -136.8800      24.8        78       122        60
OIR    2025130    131400   -9.1600 -136.8900      24.9        78       123        60
OIR    2025130    131400   -9.1600 -136.9000      24.9        78       124        60
OIR    2025130    131400   -9.1600 -136.9100      25.0        78       126        60
OIR    2025130    131400   -9.1600 -136.9200      25.0        78       125        60
OIR    2025130    131400   -9.1600 -136.9300      25.0        78       124        60
OIR    2025130    131400   -9.1600 -136.9400      25.0        78       120        60
OIR    2025130    131400   -9.1600 -136.9500      25.0        78       116        60
OIR    2025130    131400   -9.1600 -136.9600      25.0        78       113        60
OIR    2025130    131400   -9.1600 -136.9700      24.9        78       112        60
OIR    2025130    131400   -9.1600 -136.9800      24.8        78       113        60
OIR    2025130    131400   -9.1600 -136.9900      24.7        78       114        60
OIR    2025130    131400   -9.1600 -137.0000      24.6        79       114        60
OIR    2025130    131400   -9.1600 -137.0100      24.3        80       114        60
OIR    2025130    131400   -9.1600 -137.0200      23.8        81       113        60
OIR    2025130    131400   -9.1600 -137.0300      23.1        82       111        60
OIR    2025130    131400   -9.1600 -137.0400      22.5        84       110        60
OIR    2025130    131400   -9.1600 -137.0500      22.0        85       110        60
OIR    2025130    131400   -9.1600 -137.0600      21.6        87       110        60
OIR    2025130    131400   -9.1600 -137.0700      20.8        88       111        60
OIR    2025130    131400   -9.1600 -137.0800      20.3        91       113        60
OIR    2025130    131400   -9.1600 -137.0900      19.8        93       114        60
OIR    2025130    131400   -9.1600 -137.1000      19.6        94       114        60
OIR    2025130    131400   -9.1600 -137.1100      19.3        96       114        60
OIR    2025130    131400   -9.1600 -137.1200      19.1        97       114        60
OIR    2025130    131400   -9.1600 -137.1300      19.0        97       114        60
OIR    2025130    131400   -9.1600 -137.1400      19.0        97       113        60
OIR    2025130    131400   -9.1600 -137.1500      19.1        97       112        60
OIR    2025130    131400   -9.1600 -137.1600      19.2        96       112        60
OIR    2025130    131400   -9.1600 -137.1700      19.2        95       112        60
OIR    2025130    131400   -9.1600 -137.1800      19.2        94       112        60
OIR    2025130    131400   -9.1600 -137.1900      19.1        93       113        60
OIR    2025130    131400   -9.1600 -137.2000      18.9        91       113        60
OIR    2025130    131400   -9.1600 -137.2100      18.6        90       112        60
OIR    2025130    131400   -9.1600 -137.2200      18.3        88       112        60
OIR    2025130    131400   -9.1600 -137.2300      17.8        86       112        60
OIR    2025130    131400   -9.1600 -137.2400      17.3        84       114        60
OIR    2025130    131400   -9.1600 -137.2500      16.9        82       110        60
OIR    2025130    131400   -9.1600 -137.2600      16.6        79       108        60
OIR    2025130    131400   -9.1600 -137.2700      16.5        77       107        60
OIR    2025130    131400   -9.1600 -137.2800      16.6        75       105        60
OIR    2025130    131400   -9.1600 -137.2900      16.6        73       104        60
OIR    2025130    131400   -9.1600 -137.3000      16.7        71       103        60
OIR    2025130    131400   -9.1600 -137.3100      16.8        70       103        60
OIR    2025130    131400   -9.1600 -137.3200      16.7        69       103        60
OIR    2025130    131400   -9.1600 -137.3300      16.7        68       103        60
OIR    2025130    131400   -9.1600 -137.3400      16.8        67       103        60
OIR    2025130    131400   -9.1600 -137.3500      16.9        66       103        60
OIR    2025130    131400   -9.1600 -137.3600      17.1        65       103        60
OIR    2025130    131400   -9.1600 -137.3700      17.5        64       103        60
OIR    2025130    131400   -9.1600 -137.3800      18.0        63       103        60
OIR    2025130    131400   -9.1600 -137.3900      18.1        63       103        60
OIR    2025130    131400   -9.1600 -137.4000      18.2        62       103        60
OIR    2025130    131400   -9.1600 -137.4100      18.3        62       103        60
OIR    2025130    131400   -9.1600 -137.4200      18.3        62       103        60
OIR    2025130    131400   -9.1600 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.1600 -137.4400      18.3        62       103        60
OIR    2025130    131400   -9.1600 -137.4500      17.4        59       103        60
OIR    2025130    131400   -9.1600 -137.4600      16.5        55       103        60
OIR    2025130    131400   -9.1600 -137.4700      15.4        47       103        60
OIR    2025130    131400   -9.1600 -137.4800      15.0        32       103        60
OIR    2025130    131400   -9.1600 -137.4900      16.0        26       103        60
OIR    2025130    131400   -9.1600 -137.5000      16.7        26       104        60
OIR    2025130    131400   -9.1600 -137.5100      17.2        26       108        60
OIR    2025130    131400   -9.1600 -137.5200      17.6        25       112        60
OIR    2025130    131400   -9.1600 -137.5300      17.7        23       116        60
OIR    2025130    131400   -9.1600 -137.5400      17.6        23       113        60
OIR    2025130    131400   -9.1600 -137.5500      17.5        22       109        60
OIR    2025130    131400   -9.1600 -137.5600      17.4        21       105        60
OIR    2025130    131400   -9.1600 -137.5700      17.2        20       103        60
OIR    2025130    131400   -9.1600 -137.5800      16.8        16       103        60
OIR    2025130    131400   -9.1600 -137.5900      16.6        14       103        60
OIR    2025130    131400   -9.1600 -137.6000      16.5        14       103        60
OIR    2025130    131400   -9.1600 -137.6100      16.5        12       103        60
OIR    2025130    131400   -9.1600 -137.6200      16.7        10       104        60
OIR    2025130    131400   -9.1600 -137.6300      17.1         5       107        60
OIR    2025130    131400   -9.1600 -137.6400      17.6         3       112        60
OIR    2025130    131400   -9.1600 -137.6500      18.4       357       114        60
OIR    2025130    131400   -9.1600 -137.6600      18.7       353       116        60
OIR    2025130    131400   -9.1600 -137.6700      18.7       352       120        60
OIR    2025130    131400   -9.1600 -137.6800      18.6       352       125        60
OIR    2025130    131400   -9.1600 -137.6900      18.2       350       135        60
OIR    2025130    131400   -9.1600 -137.7000      16.9       346       142        60
OIR    2025130    131400   -9.1600 -137.7100      15.5       343       144        60
OIR    2025130    131400   -9.1600 -137.7200      15.2       343       146        60
OIR    2025130    131400   -9.1600 -137.7300      15.0       343       144        60
OIR    2025130    131400   -9.1600 -137.7400      14.3       345       143        60
OIR    2025130    131400   -9.1600 -137.7500      13.8       346       142        60
OIR    2025130    131400   -9.1600 -137.7600      13.5       346       140        60
OIR    2025130    131400   -9.1600 -137.7700      13.0       346       138        60
OIR    2025130    131400   -9.1600 -137.7800      10.6       342       137        60
OIR    2025130    131400   -9.1600 -137.7900       5.8       324       136        60
OIR    2025130    131400   -9.1600 -137.8700       4.1       262       127        60
OIR    2025130    131400   -9.1600 -137.8800       4.2       263       127        60
OIR    2025130    131400   -9.1600 -137.8900       4.3       263       128        60
OIR    2025130    131400   -9.1600 -137.9000       4.3       262       129        60
OIR    2025130    131400   -9.1600 -137.9100       4.6       261       130        60
OIR    2025130    131400   -9.1600 -137.9200       4.7       259       132        60
OIR    2025130    131400   -9.1600 -137.9300       5.2       257       135        60
OIR    2025130    131400   -9.1600 -137.9400       5.4       257       138        60
OIR    2025130    131400   -9.1600 -137.9500       5.9       257       139        60
OIR    2025130    131400   -9.1600 -137.9600       6.8       259       141        60
OIR    2025130    131400   -9.1600 -137.9700       7.9       263       144        60
OIR    2025130    131400   -9.1600 -138.2000      18.8        42       142        60
OIR    2025130    131400   -9.1600 -138.2100      20.9        35       125        60
OIR    2025130    131400   -9.1600 -138.2200      21.7        35       117        60
OIR    2025130    131400   -9.1600 -138.2300      22.6        33       111        60
OIR    2025130    131400   -9.1600 -138.2400      23.0        30       105        60
OIR    2025130    131400   -9.1600 -138.2500      23.1        29       103        60
OIR    2025130    131400   -9.1600 -138.2600      23.1        27       103        60
OIR    2025130    131400   -9.1600 -138.2700      22.6        18       103        60
OIR    2025130    131400   -9.1600 -138.2800      22.8        13       103        60
OIR    2025130    131400   -9.1600 -138.2900      23.0        11       103        60
OIR    2025130    131400   -9.1600 -138.3000      23.2         9       103        60
OIR    2025130    131400   -9.1600 -138.3100      23.9         6       103        60
OIR    2025130    131400   -9.1600 -138.3200      25.1         3       103        60
OIR    2025130    131400   -9.1600 -138.3300      26.3         0       103        60
OIR    2025130    131400   -9.1600 -138.3400      26.5         0       103        60
OIR    2025130    131400   -9.1600 -138.3500      26.7       360       103        60
OIR    2025130    131400   -9.1600 -138.3600      26.8       360       103        60
OIR    2025130    131400   -9.1600 -138.3700      26.9       359       103        60
OIR    2025130    131400   -9.1600 -138.3800      26.9       359       103        60
OIR    2025130    131400   -9.1600 -138.3900      27.0       359       103        60
OIR    2025130    131400   -9.1600 -138.4000      27.1       358       103        60
OIR    2025130    131400   -9.1600 -138.4100      27.1       358       103        60
OIR    2025130    131400   -9.1600 -138.4200      27.2       358       103        60
OIR    2025130    131400   -9.1600 -138.4300      27.2       358       103        60
OIR    2025130    131400   -9.1600 -138.4400      27.2       358       103        60
OIR    2025130    131400   -9.1600 -138.4500      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.4600      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.4700      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.4800      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.4900      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5000      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5100      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5200      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5300      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5400      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5500      27.2       357       103        60
OIR    2025130    131400   -9.1600 -138.5600      27.1       357       103        60
OIR    2025130    131400   -9.1600 -138.5700      27.1       357       103        60
OIR    2025130    131400   -9.1600 -138.5800      27.0       356       103        60
OIR    2025130    131400   -9.1600 -138.5900      27.0       356       103        60
OIR    2025130    131400   -9.1600 -138.6000      26.8       356       103        60
OIR    2025130    131400   -9.1600 -138.6100      26.6       356       103        60
OIR    2025130    131400   -9.1600 -138.6200      26.2       355       104        60
OIR    2025130    131400   -9.1600 -138.6300      25.9       354       105        60
OIR    2025130    131400   -9.1600 -138.6400      25.8       354       105        60
OIR    2025130    131400   -9.1600 -138.6500      25.6       354       105        60
OIR    2025130    131400   -9.1600 -138.6600      25.4       354       104        60
OIR    2025130    131400   -9.1600 -138.6700      25.3       354       105        60
OIR    2025130    131400   -9.1600 -138.6800      25.2       354       107        60
OIR    2025130    131400   -9.1600 -138.6900      25.0       353       105        60
OIR    2025130    131400   -9.1600 -138.7000      24.4       353       103        60
OIR    2025130    131400   -9.1600 -138.7100      23.7       351       103        60
OIR    2025130    131400   -9.1600 -138.7200      22.9       348       103        60
OIR    2025130    131400   -9.1600 -138.7300      22.1       345       103        60
OIR    2025130    131400   -9.1600 -138.7400      21.4       343       104        60
OIR    2025130    131400   -9.1600 -138.7500      20.6       340       107        60
OIR    2025130    131400   -9.1600 -138.7600      20.1       338       110        60
OIR    2025130    131400   -9.1600 -138.7700      19.5       336       113        60
OIR    2025130    131400   -9.1600 -138.7800      18.9       334       115        60
OIR    2025130    131400   -9.1600 -138.7900      18.2       331       116        60
OIR    2025130    131400   -9.1600 -138.8000      17.5       328       117        60
OIR    2025130    131400   -9.1600 -138.8100      17.0       325       119        60
OIR    2025130    131400   -9.1600 -138.8200      16.8       324       119        60
OIR    2025130    131400   -9.1600 -138.8300      16.6       323       119        60
OIR    2025130    131400   -9.1600 -138.8400      16.3       322       120        60
OIR    2025130    131400   -9.1600 -138.8500      15.8       319       122        60
OIR    2025130    131400   -9.1600 -138.8600      15.5       317       126        60
OIR    2025130    131400   -9.1600 -138.8700      15.3       316       130        60
OIR    2025130    131400   -9.1600 -138.8800      15.2       315       131        60
OIR    2025130    131400   -9.1600 -138.8900      15.2       315       132        60
OIR    2025130    131400   -9.1600 -138.9000      15.1       314       132        60
OIR    2025130    131400   -9.1600 -138.9100      15.1       314       133        60
OIR    2025130    131400   -9.1600 -138.9200      15.0       314       134        60
OIR    2025130    131400   -9.1600 -138.9300      14.9       313       134        60
OIR    2025130    131400   -9.1600 -138.9400      14.8       313       134        60
OIR    2025130    131400   -9.1600 -138.9500      14.3       314       133        60
OIR    2025130    131400   -9.1600 -138.9600      12.3       317       133        60
OIR    2025130    131400   -9.1600 -138.9700      11.8       316       133        60
OIR    2025130    131400   -9.1600 -138.9800      11.6       316       139        60
OIR    2025130    131400   -9.1700 -136.3400      40.6        95       143        60
OIR    2025130    131400   -9.1700 -136.5200      36.1       101       138        60
OIR    2025130    131400   -9.1700 -136.5300      35.8       100       134        60
OIR    2025130    131400   -9.1700 -136.5400      35.5       100       131        60
OIR    2025130    131400   -9.1700 -136.5500      35.1        99       130        60
OIR    2025130    131400   -9.1700 -136.5600      34.4        99       130        60
OIR    2025130    131400   -9.1700 -136.5700      33.7        98       131        60
OIR    2025130    131400   -9.1700 -136.5800      33.0        98       132        60
OIR    2025130    131400   -9.1700 -136.5900      32.0        98       130        60
OIR    2025130    131400   -9.1700 -136.6000      31.5        98       127        60
OIR    2025130    131400   -9.1700 -136.6100      31.1        97       128        60
OIR    2025130    131400   -9.1700 -136.6200      30.6        97       128        60
OIR    2025130    131400   -9.1700 -136.6300      30.1        96       129        60
OIR    2025130    131400   -9.1700 -136.6400      29.6        95       129        60
OIR    2025130    131400   -9.1700 -136.6500      29.0        94       128        60
OIR    2025130    131400   -9.1700 -136.6600      28.6        93       128        60
OIR    2025130    131400   -9.1700 -136.6700      28.5        92       128        60
OIR    2025130    131400   -9.1700 -136.6800      28.6        91       127        60
OIR    2025130    131400   -9.1700 -136.6900      28.8        90       124        60
OIR    2025130    131400   -9.1700 -136.7000      29.1        89       124        60
OIR    2025130    131400   -9.1700 -136.7100      29.1        88       123        60
OIR    2025130    131400   -9.1700 -136.7200      28.9        87       124        60
OIR    2025130    131400   -9.1700 -136.7300      28.9        86       125        60
OIR    2025130    131400   -9.1700 -136.7400      28.6        85       124        60
OIR    2025130    131400   -9.1700 -136.7500      28.1        85       122        60
OIR    2025130    131400   -9.1700 -136.7600      27.6        85       120        60
OIR    2025130    131400   -9.1700 -136.7700      27.1        84       117        60
OIR    2025130    131400   -9.1700 -136.7800      26.3        83       116        60
OIR    2025130    131400   -9.1700 -136.7900      25.9        81       115        60
OIR    2025130    131400   -9.1700 -136.8000      25.6        79       116        60
OIR    2025130    131400   -9.1700 -136.8100      25.3        77       115        60
OIR    2025130    131400   -9.1700 -136.8200      25.1        77       114        60
OIR    2025130    131400   -9.1700 -136.8300      25.0        76       114        60
OIR    2025130    131400   -9.1700 -136.8400      24.9        76       114        60
OIR    2025130    131400   -9.1700 -136.8500      24.9        77       116        60
OIR    2025130    131400   -9.1700 -136.8600      24.8        77       117        60
OIR    2025130    131400   -9.1700 -136.8700      24.8        77       120        60
OIR    2025130    131400   -9.1700 -136.8800      24.9        77       122        60
OIR    2025130    131400   -9.1700 -136.8900      25.0        78       124        60
OIR    2025130    131400   -9.1700 -136.9000      25.0        78       125        60
OIR    2025130    131400   -9.1700 -136.9100      25.1        78       126        60
OIR    2025130    131400   -9.1700 -136.9200      25.1        78       125        60
OIR    2025130    131400   -9.1700 -136.9300      25.1        78       122        60
OIR    2025130    131400   -9.1700 -136.9400      25.1        78       117        60
OIR    2025130    131400   -9.1700 -136.9500      25.1        78       115        60
OIR    2025130    131400   -9.1700 -136.9600      25.0        78       113        60
OIR    2025130    131400   -9.1700 -136.9700      25.0        78       113        60
OIR    2025130    131400   -9.1700 -136.9800      24.9        78       114        60
OIR    2025130    131400   -9.1700 -136.9900      24.8        78       114        60
OIR    2025130    131400   -9.1700 -137.0000      24.7        78       115        60
OIR    2025130    131400   -9.1700 -137.0100      24.5        78       114        60
OIR    2025130    131400   -9.1700 -137.0200      24.2        79       113        60
OIR    2025130    131400   -9.1700 -137.0300      23.7        79       111        60
OIR    2025130    131400   -9.1700 -137.0400      23.2        80       110        60
OIR    2025130    131400   -9.1700 -137.0500      22.7        81       110        60
OIR    2025130    131400   -9.1700 -137.0600      22.3        83       110        60
OIR    2025130    131400   -9.1700 -137.0700      21.8        84       111        60
OIR    2025130    131400   -9.1700 -137.0800      21.4        86       112        60
OIR    2025130    131400   -9.1700 -137.0900      21.0        88       113        60
OIR    2025130    131400   -9.1700 -137.1000      20.7        89       113        60
OIR    2025130    131400   -9.1700 -137.1100      20.4        90       113        60
OIR    2025130    131400   -9.1700 -137.1200      20.1        91       113        60
OIR    2025130    131400   -9.1700 -137.1300      19.7        92       113        60
OIR    2025130    131400   -9.1700 -137.1400      19.5        94       113        60
OIR    2025130    131400   -9.1700 -137.1500      19.4        94       113        60
OIR    2025130    131400   -9.1700 -137.1600      19.5        94       113        60
OIR    2025130    131400   -9.1700 -137.1700      19.5        93       113        60
OIR    2025130    131400   -9.1700 -137.1800      19.5        92       112        60
OIR    2025130    131400   -9.1700 -137.1900      19.4        90       112        60
OIR    2025130    131400   -9.1700 -137.2000      19.3        89       111        60
OIR    2025130    131400   -9.1700 -137.2100      19.0        88       111        60
OIR    2025130    131400   -9.1700 -137.2200      18.7        87       111        60
OIR    2025130    131400   -9.1700 -137.2300      18.2        85       113        60
OIR    2025130    131400   -9.1700 -137.2400      17.7        83       116        60
OIR    2025130    131400   -9.1700 -137.2500      17.2        80       111        60
OIR    2025130    131400   -9.1700 -137.2600      16.9        78       108        60
OIR    2025130    131400   -9.1700 -137.2700      16.8        75       108        60
OIR    2025130    131400   -9.1700 -137.2800      16.9        74       107        60
OIR    2025130    131400   -9.1700 -137.2900      17.0        71       104        60
OIR    2025130    131400   -9.1700 -137.3000      17.1        70       103        60
OIR    2025130    131400   -9.1700 -137.3100      17.2        68       103        60
OIR    2025130    131400   -9.1700 -137.3200      17.1        67       103        60
OIR    2025130    131400   -9.1700 -137.3300      17.1        67       103        60
OIR    2025130    131400   -9.1700 -137.3400      17.2        66       103        60
OIR    2025130    131400   -9.1700 -137.3500      17.3        65       103        60
OIR    2025130    131400   -9.1700 -137.3600      17.5        64       103        60
OIR    2025130    131400   -9.1700 -137.3700      17.7        63       103        60
OIR    2025130    131400   -9.1700 -137.3800      18.1        63       103        60
OIR    2025130    131400   -9.1700 -137.3900      18.3        62       103        60
OIR    2025130    131400   -9.1700 -137.4000      18.3        62       103        60
OIR    2025130    131400   -9.1700 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.1700 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.1700 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.1700 -137.4400      18.4        62       103        60
OIR    2025130    131400   -9.1700 -137.4500      18.1        60       103        60
OIR    2025130    131400   -9.1700 -137.4600      17.1        56       103        60
OIR    2025130    131400   -9.1700 -137.4700      16.4        52       103        60
OIR    2025130    131400   -9.1700 -137.4800      15.5        42       103        60
OIR    2025130    131400   -9.1700 -137.4900      15.5        30       103        60
OIR    2025130    131400   -9.1700 -137.5000      16.3        28       104        60
OIR    2025130    131400   -9.1700 -137.5100      16.9        27       112        60
OIR    2025130    131400   -9.1700 -137.5200      17.6        26       119        60
OIR    2025130    131400   -9.1700 -137.5300      17.4        23       123        60
OIR    2025130    131400   -9.1700 -137.5400      17.2        22       120        60
OIR    2025130    131400   -9.1700 -137.5500      17.2        21       115        60
OIR    2025130    131400   -9.1700 -137.5600      17.1        20       109        60
OIR    2025130    131400   -9.1700 -137.5700      17.0        19       103        60
OIR    2025130    131400   -9.1700 -137.5800      16.7        16       103        60
OIR    2025130    131400   -9.1700 -137.5900      16.5        15       103        60
OIR    2025130    131400   -9.1700 -137.6000      16.5        13       103        60
OIR    2025130    131400   -9.1700 -137.6100      16.5        12       103        60
OIR    2025130    131400   -9.1700 -137.6200      16.7         8       104        60
OIR    2025130    131400   -9.1700 -137.6300      17.1         4       108        60
OIR    2025130    131400   -9.1700 -137.6400      17.5         1       115        60
OIR    2025130    131400   -9.1700 -137.6500      18.0       357       117        60
OIR    2025130    131400   -9.1700 -137.6600      18.4       353       120        60
OIR    2025130    131400   -9.1700 -137.6700      18.5       352       124        60
OIR    2025130    131400   -9.1700 -137.6800      18.4       352       129        60
OIR    2025130    131400   -9.1700 -137.6900      18.1       350       140        60
OIR    2025130    131400   -9.1700 -137.7000      16.5       345       147        60
OIR    2025130    131400   -9.1700 -137.7100      15.6       344       147        60
OIR    2025130    131400   -9.1700 -137.7200      15.4       343       146        60
OIR    2025130    131400   -9.1700 -137.7300      15.1       343       143        60
OIR    2025130    131400   -9.1700 -137.7400      14.5       345       141        60
OIR    2025130    131400   -9.1700 -137.7500      13.9       345       140        60
OIR    2025130    131400   -9.1700 -137.7600      13.5       346       139        60
OIR    2025130    131400   -9.1700 -137.7700      12.9       345       138        60
OIR    2025130    131400   -9.1700 -137.7800      10.5       341       137        60
OIR    2025130    131400   -9.1700 -137.7900       6.0       322       135        60
OIR    2025130    131400   -9.1700 -137.8000       4.2       298       134        60
OIR    2025130    131400   -9.1700 -137.8500       4.0       267       127        60
OIR    2025130    131400   -9.1700 -137.8600       4.2       266       126        60
OIR    2025130    131400   -9.1700 -137.8700       4.4       265       126        60
OIR    2025130    131400   -9.1700 -137.8800       4.4       265       125        60
OIR    2025130    131400   -9.1700 -137.8900       4.4       264       125        60
OIR    2025130    131400   -9.1700 -137.9000       4.5       264       125        60
OIR    2025130    131400   -9.1700 -137.9100       4.7       263       126        60
OIR    2025130    131400   -9.1700 -137.9200       4.8       262       128        60
OIR    2025130    131400   -9.1700 -137.9300       5.2       260       131        60
OIR    2025130    131400   -9.1700 -137.9400       5.5       259       135        60
OIR    2025130    131400   -9.1700 -137.9500       5.8       260       137        60
OIR    2025130    131400   -9.1700 -137.9600       6.7       261       141        60
OIR    2025130    131400   -9.1700 -137.9700       7.6       263       144        60
OIR    2025130    131400   -9.1700 -137.9800      10.5       271       147        60
OIR    2025130    131400   -9.1700 -138.2200      23.1        39       135        60
OIR    2025130    131400   -9.1700 -138.2300      22.7        34       120        60
OIR    2025130    131400   -9.1700 -138.2400      22.8        31       109        60
OIR    2025130    131400   -9.1700 -138.2500      22.4        29       103        60
OIR    2025130    131400   -9.1700 -138.2600      22.4        24       103        60
OIR    2025130    131400   -9.1700 -138.2700      22.3        14       103        60
OIR    2025130    131400   -9.1700 -138.2800      22.7        11       103        60
OIR    2025130    131400   -9.1700 -138.2900      23.0        10       103        60
OIR    2025130    131400   -9.1700 -138.3000      23.3         9       103        60
OIR    2025130    131400   -9.1700 -138.3100      24.0         6       103        60
OIR    2025130    131400   -9.1700 -138.3200      25.0         4       103        60
OIR    2025130    131400   -9.1700 -138.3300      26.2         1       103        60
OIR    2025130    131400   -9.1700 -138.3400      26.6         0       103        60
OIR    2025130    131400   -9.1700 -138.3500      26.8         0       103        60
OIR    2025130    131400   -9.1700 -138.3600      26.9       360       103        60
OIR    2025130    131400   -9.1700 -138.3700      27.0       360       103        60
OIR    2025130    131400   -9.1700 -138.3800      27.1       359       103        60
OIR    2025130    131400   -9.1700 -138.3900      27.2       359       103        60
OIR    2025130    131400   -9.1700 -138.4000      27.2       359       103        60
OIR    2025130    131400   -9.1700 -138.4100      27.3       358       103        60
OIR    2025130    131400   -9.1700 -138.4200      27.3       358       103        60
OIR    2025130    131400   -9.1700 -138.4300      27.4       358       103        60
OIR    2025130    131400   -9.1700 -138.4400      27.4       358       103        60
OIR    2025130    131400   -9.1700 -138.4500      27.4       357       103        60
OIR    2025130    131400   -9.1700 -138.4600      27.3       357       103        60
OIR    2025130    131400   -9.1700 -138.4700      27.3       357       103        60
OIR    2025130    131400   -9.1700 -138.4800      27.3       357       103        60
OIR    2025130    131400   -9.1700 -138.4900      27.3       357       103        60
OIR    2025130    131400   -9.1700 -138.5000      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5100      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5200      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5300      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5400      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5500      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5600      27.2       357       103        60
OIR    2025130    131400   -9.1700 -138.5700      27.1       357       103        60
OIR    2025130    131400   -9.1700 -138.5800      27.1       356       103        60
OIR    2025130    131400   -9.1700 -138.5900      27.0       356       103        60
OIR    2025130    131400   -9.1700 -138.6000      26.9       356       103        60
OIR    2025130    131400   -9.1700 -138.6100      26.6       356       103        60
OIR    2025130    131400   -9.1700 -138.6200      26.2       355       103        60
OIR    2025130    131400   -9.1700 -138.6300      26.0       354       104        60
OIR    2025130    131400   -9.1700 -138.6400      25.8       354       104        60
OIR    2025130    131400   -9.1700 -138.6500      25.7       354       104        60
OIR    2025130    131400   -9.1700 -138.6600      25.5       354       104        60
OIR    2025130    131400   -9.1700 -138.6700      25.4       354       105        60
OIR    2025130    131400   -9.1700 -138.6800      25.2       353       105        60
OIR    2025130    131400   -9.1700 -138.6900      24.8       353       104        60
OIR    2025130    131400   -9.1700 -138.7000      24.1       351       103        60
OIR    2025130    131400   -9.1700 -138.7100      23.4       349       103        60
OIR    2025130    131400   -9.1700 -138.7200      22.7       347       103        60
OIR    2025130    131400   -9.1700 -138.7300      21.9       344       103        60
OIR    2025130    131400   -9.1700 -138.7400      21.3       342       103        60
OIR    2025130    131400   -9.1700 -138.7500      20.7       339       107        60
OIR    2025130    131400   -9.1700 -138.7600      20.3       338       110        60
OIR    2025130    131400   -9.1700 -138.7700      19.9       336       112        60
OIR    2025130    131400   -9.1700 -138.7800      19.3       334       114        60
OIR    2025130    131400   -9.1700 -138.7900      18.5       331       116        60
OIR    2025130    131400   -9.1700 -138.8000      17.7       328       116        60
OIR    2025130    131400   -9.1700 -138.8100      17.1       325       117        60
OIR    2025130    131400   -9.1700 -138.8200      16.9       324       116        60
OIR    2025130    131400   -9.1700 -138.8300      16.8       323       116        60
OIR    2025130    131400   -9.1700 -138.8400      16.5       322       117        60
OIR    2025130    131400   -9.1700 -138.8500      16.1       319       119        60
OIR    2025130    131400   -9.1700 -138.8600      15.8       317       125        60
OIR    2025130    131400   -9.1700 -138.8700      15.6       316       129        60
OIR    2025130    131400   -9.1700 -138.8800      15.5       315       130        60
OIR    2025130    131400   -9.1700 -138.8900      15.4       314       130        60
OIR    2025130    131400   -9.1700 -138.9000      15.3       314       131        60
OIR    2025130    131400   -9.1700 -138.9100      15.2       313       133        60
OIR    2025130    131400   -9.1700 -138.9200      15.1       313       135        60
OIR    2025130    131400   -9.1700 -138.9300      15.0       313       135        60
OIR    2025130    131400   -9.1700 -138.9400      14.8       313       134        60
OIR    2025130    131400   -9.1700 -138.9500      14.3       313       134        60
OIR    2025130    131400   -9.1700 -138.9600      12.4       316       134        60
OIR    2025130    131400   -9.1700 -138.9700      12.0       316       133        60
OIR    2025130    131400   -9.1700 -138.9800      11.6       316       137        60
OIR    2025130    131400   -9.1800 -136.3300      40.4        95       143        60
OIR    2025130    131400   -9.1800 -136.3400      40.6        95       141        60
OIR    2025130    131400   -9.1800 -136.5100      36.8       100       142        60
OIR    2025130    131400   -9.1800 -136.5200      36.3       100       137        60
OIR    2025130    131400   -9.1800 -136.5300      35.9        99       133        60
OIR    2025130    131400   -9.1800 -136.5400      35.3        99       131        60
OIR    2025130    131400   -9.1800 -136.5500      34.7        99       130        60
OIR    2025130    131400   -9.1800 -136.5600      34.0        98       130        60
OIR    2025130    131400   -9.1800 -136.5700      33.3        97       131        60
OIR    2025130    131400   -9.1800 -136.5800      32.6        97       132        60
OIR    2025130    131400   -9.1800 -136.5900      31.7        97       130        60
OIR    2025130    131400   -9.1800 -136.6000      31.3        97       129        60
OIR    2025130    131400   -9.1800 -136.6100      30.9        96       128        60
OIR    2025130    131400   -9.1800 -136.6200      30.3        96       127        60
OIR    2025130    131400   -9.1800 -136.6300      29.5        95       128        60
OIR    2025130    131400   -9.1800 -136.6400      28.8        93       128        60
OIR    2025130    131400   -9.1800 -136.6500      28.1        92       128        60
OIR    2025130    131400   -9.1800 -136.6600      27.8        90       127        60
OIR    2025130    131400   -9.1800 -136.6700      27.8        90       127        60
OIR    2025130    131400   -9.1800 -136.6800      27.8        89       125        60
OIR    2025130    131400   -9.1800 -136.6900      28.0        88       124        60
OIR    2025130    131400   -9.1800 -136.7000      28.2        87       123        60
OIR    2025130    131400   -9.1800 -136.7100      28.4        86       122        60
OIR    2025130    131400   -9.1800 -136.7200      28.3        85       123        60
OIR    2025130    131400   -9.1800 -136.7300      28.1        84       123        60
OIR    2025130    131400   -9.1800 -136.7400      27.8        82       123        60
OIR    2025130    131400   -9.1800 -136.7500      27.4        81       122        60
OIR    2025130    131400   -9.1800 -136.7600      26.7        82       121        60
OIR    2025130    131400   -9.1800 -136.7700      26.2        81       119        60
OIR    2025130    131400   -9.1800 -136.7800      25.8        80       116        60
OIR    2025130    131400   -9.1800 -136.7900      25.5        79       116        60
OIR    2025130    131400   -9.1800 -136.8000      25.3        77       116        60
OIR    2025130    131400   -9.1800 -136.8100      25.2        76       114        60
OIR    2025130    131400   -9.1800 -136.8200      25.0        76       113        60
OIR    2025130    131400   -9.1800 -136.8300      24.9        76       115        60
OIR    2025130    131400   -9.1800 -136.8400      24.9        76       116        60
OIR    2025130    131400   -9.1800 -136.8500      24.9        76       116        60
OIR    2025130    131400   -9.1800 -136.8600      24.9        76       119        60
OIR    2025130    131400   -9.1800 -136.8700      25.0        77       122        60
OIR    2025130    131400   -9.1800 -136.8800      25.0        77       123        60
OIR    2025130    131400   -9.1800 -136.8900      25.1        77       125        60
OIR    2025130    131400   -9.1800 -136.9000      25.1        77       125        60
OIR    2025130    131400   -9.1800 -136.9100      25.1        77       125        60
OIR    2025130    131400   -9.1800 -136.9200      25.2        77       123        60
OIR    2025130    131400   -9.1800 -136.9300      25.2        77       121        60
OIR    2025130    131400   -9.1800 -136.9400      25.2        77       116        60
OIR    2025130    131400   -9.1800 -136.9500      25.1        78       114        60
OIR    2025130    131400   -9.1800 -136.9600      25.1        78       112        60
OIR    2025130    131400   -9.1800 -136.9700      25.0        78       111        60
OIR    2025130    131400   -9.1800 -136.9800      25.0        78       112        60
OIR    2025130    131400   -9.1800 -136.9900      24.9        78       113        60
OIR    2025130    131400   -9.1800 -137.0000      24.8        78       114        60
OIR    2025130    131400   -9.1800 -137.0100      24.7        78       113        60
OIR    2025130    131400   -9.1800 -137.0200      24.4        78       112        60
OIR    2025130    131400   -9.1800 -137.0300      24.1        78       110        60
OIR    2025130    131400   -9.1800 -137.0400      23.7        78       109        60
OIR    2025130    131400   -9.1800 -137.0500      23.3        79       109        60
OIR    2025130    131400   -9.1800 -137.0600      23.1        80       109        60
OIR    2025130    131400   -9.1800 -137.0700      22.8        81       110        60
OIR    2025130    131400   -9.1800 -137.0800      22.5        82       111        60
OIR    2025130    131400   -9.1800 -137.0900      22.3        83       112        60
OIR    2025130    131400   -9.1800 -137.1000      22.0        84       113        60
OIR    2025130    131400   -9.1800 -137.1100      21.8        84       114        60
OIR    2025130    131400   -9.1800 -137.1200      21.4        85       113        60
OIR    2025130    131400   -9.1800 -137.1300      20.9        87       113        60
OIR    2025130    131400   -9.1800 -137.1400      20.5        88       112        60
OIR    2025130    131400   -9.1800 -137.1500      20.2        89       112        60
OIR    2025130    131400   -9.1800 -137.1600      20.0        90       111        60
OIR    2025130    131400   -9.1800 -137.1700      20.0        90       111        60
OIR    2025130    131400   -9.1800 -137.1800      19.9        89       111        60
OIR    2025130    131400   -9.1800 -137.1900      19.8        88       111        60
OIR    2025130    131400   -9.1800 -137.2000      19.7        87       110        60
OIR    2025130    131400   -9.1800 -137.2100      19.5        86       111        60
OIR    2025130    131400   -9.1800 -137.2200      19.2        85       111        60
OIR    2025130    131400   -9.1800 -137.2300      18.7        83       113        60
OIR    2025130    131400   -9.1800 -137.2400      18.2        81       116        60
OIR    2025130    131400   -9.1800 -137.2500      17.7        79       112        60
OIR    2025130    131400   -9.1800 -137.2600      17.5        76       109        60
OIR    2025130    131400   -9.1800 -137.2700      17.4        74       107        60
OIR    2025130    131400   -9.1800 -137.2800      17.3        72       105        60
OIR    2025130    131400   -9.1800 -137.2900      17.5        70       104        60
OIR    2025130    131400   -9.1800 -137.3000      17.7        68       103        60
OIR    2025130    131400   -9.1800 -137.3100      17.8        67       103        60
OIR    2025130    131400   -9.1800 -137.3200      17.7        66       103        60
OIR    2025130    131400   -9.1800 -137.3300      17.6        65       103        60
OIR    2025130    131400   -9.1800 -137.3400      17.7        65       103        60
OIR    2025130    131400   -9.1800 -137.3500      17.8        64       103        60
OIR    2025130    131400   -9.1800 -137.3600      17.9        63       103        60
OIR    2025130    131400   -9.1800 -137.3700      18.1        63       103        60
OIR    2025130    131400   -9.1800 -137.3800      18.3        62       103        60
OIR    2025130    131400   -9.1800 -137.3900      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4000      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4400      18.4        62       103        60
OIR    2025130    131400   -9.1800 -137.4500      18.1        60       103        60
OIR    2025130    131400   -9.1800 -137.4600      17.1        57       103        60
OIR    2025130    131400   -9.1800 -137.4700      16.4        54       103        60
OIR    2025130    131400   -9.1800 -137.4800      15.1        46       103        60
OIR    2025130    131400   -9.1800 -137.4900      14.1        33       103        60
OIR    2025130    131400   -9.1800 -137.5000      14.8        32       104        60
OIR    2025130    131400   -9.1800 -137.5100      15.7        30       113        60
OIR    2025130    131400   -9.1800 -137.5200      16.9        29       120        60
OIR    2025130    131400   -9.1800 -137.5300      16.9        22       127        60
OIR    2025130    131400   -9.1800 -137.5400      16.9        21       123        60
OIR    2025130    131400   -9.1800 -137.5500      17.0        21       117        60
OIR    2025130    131400   -9.1800 -137.5600      17.0        20       112        60
OIR    2025130    131400   -9.1800 -137.5700      17.0        20       105        60
OIR    2025130    131400   -9.1800 -137.5800      16.8        17       104        60
OIR    2025130    131400   -9.1800 -137.5900      16.6        14       103        60
OIR    2025130    131400   -9.1800 -137.6000      16.5        12       104        60
OIR    2025130    131400   -9.1800 -137.6100      16.6         9       105        60
OIR    2025130    131400   -9.1800 -137.6200      16.9         5       105        60
OIR    2025130    131400   -9.1800 -137.6300      17.3         2       112        60
OIR    2025130    131400   -9.1800 -137.6400      17.5       360       120        60
OIR    2025130    131400   -9.1800 -137.6500      17.8       357       122        60
OIR    2025130    131400   -9.1800 -137.6600      18.3       353       124        60
OIR    2025130    131400   -9.1800 -137.6700      18.4       352       127        60
OIR    2025130    131400   -9.1800 -137.6800      18.4       352       132        60
OIR    2025130    131400   -9.1800 -137.6900      18.2       349       142        60
OIR    2025130    131400   -9.1800 -137.7000      17.6       345       147        60
OIR    2025130    131400   -9.1800 -137.7100      16.5       344       146        60
OIR    2025130    131400   -9.1800 -137.7200      15.6       344       144        60
OIR    2025130    131400   -9.1800 -137.7300      15.1       344       139        60
OIR    2025130    131400   -9.1800 -137.7400      14.5       344       138        60
OIR    2025130    131400   -9.1800 -137.7500      13.9       345       138        60
OIR    2025130    131400   -9.1800 -137.7600      13.4       345       137        60
OIR    2025130    131400   -9.1800 -137.7700      12.6       344       137        60
OIR    2025130    131400   -9.1800 -137.7800      10.3       340       136        60
OIR    2025130    131400   -9.1800 -137.7900       6.2       319       134        60
OIR    2025130    131400   -9.1800 -137.8000       4.6       295       132        60
OIR    2025130    131400   -9.1800 -137.8100       4.3       286       131        60
OIR    2025130    131400   -9.1800 -137.8200       4.2       280       130        60
OIR    2025130    131400   -9.1800 -137.8300       4.2       275       129        60
OIR    2025130    131400   -9.1800 -137.8400       4.3       272       128        60
OIR    2025130    131400   -9.1800 -137.8500       4.4       270       127        60
OIR    2025130    131400   -9.1800 -137.8600       4.5       268       126        60
OIR    2025130    131400   -9.1800 -137.8700       4.6       267       125        60
OIR    2025130    131400   -9.1800 -137.8800       4.6       266       124        60
OIR    2025130    131400   -9.1800 -137.8900       4.6       266       123        60
OIR    2025130    131400   -9.1800 -137.9000       4.6       265       123        60
OIR    2025130    131400   -9.1800 -137.9100       4.9       264       124        60
OIR    2025130    131400   -9.1800 -137.9200       5.0       264       127        60
OIR    2025130    131400   -9.1800 -137.9300       5.2       263       130        60
OIR    2025130    131400   -9.1800 -137.9400       5.6       262       133        60
OIR    2025130    131400   -9.1800 -137.9500       5.9       263       137        60
OIR    2025130    131400   -9.1800 -137.9600       6.5       263       141        60
OIR    2025130    131400   -9.1800 -137.9700       7.4       265       144        60
OIR    2025130    131400   -9.1800 -137.9800      10.2       271       147        60
OIR    2025130    131400   -9.1800 -138.2400      22.2        32       126        60
OIR    2025130    131400   -9.1800 -138.2500      22.1        28       112        60
OIR    2025130    131400   -9.1800 -138.2600      21.8        18       104        60
OIR    2025130    131400   -9.1800 -138.2700      21.9        10       103        60
OIR    2025130    131400   -9.1800 -138.2800      22.6        10       103        60
OIR    2025130    131400   -9.1800 -138.2900      23.1         9       103        60
OIR    2025130    131400   -9.1800 -138.3000      23.4         8       103        60
OIR    2025130    131400   -9.1800 -138.3100      24.1         7       103        60
OIR    2025130    131400   -9.1800 -138.3200      25.0         5       103        60
OIR    2025130    131400   -9.1800 -138.3300      26.2         2       103        60
OIR    2025130    131400   -9.1800 -138.3400      26.7         1       103        60
OIR    2025130    131400   -9.1800 -138.3500      26.9         0       103        60
OIR    2025130    131400   -9.1800 -138.3600      27.1       360       103        60
OIR    2025130    131400   -9.1800 -138.3700      27.2       360       103        60
OIR    2025130    131400   -9.1800 -138.3800      27.2       359       103        60
OIR    2025130    131400   -9.1800 -138.3900      27.3       359       103        60
OIR    2025130    131400   -9.1800 -138.4000      27.4       359       103        60
OIR    2025130    131400   -9.1800 -138.4100      27.5       358       103        60
OIR    2025130    131400   -9.1800 -138.4200      27.5       358       103        60
OIR    2025130    131400   -9.1800 -138.4300      27.6       358       103        60
OIR    2025130    131400   -9.1800 -138.4400      27.6       358       103        60
OIR    2025130    131400   -9.1800 -138.4500      27.6       357       103        60
OIR    2025130    131400   -9.1800 -138.4600      27.5       357       103        60
OIR    2025130    131400   -9.1800 -138.4700      27.5       357       103        60
OIR    2025130    131400   -9.1800 -138.4800      27.4       357       103        60
OIR    2025130    131400   -9.1800 -138.4900      27.4       357       103        60
OIR    2025130    131400   -9.1800 -138.5000      27.3       357       103        60
OIR    2025130    131400   -9.1800 -138.5100      27.3       357       103        60
OIR    2025130    131400   -9.1800 -138.5200      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5300      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5400      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5500      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5600      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5700      27.2       357       103        60
OIR    2025130    131400   -9.1800 -138.5800      27.1       356       103        60
OIR    2025130    131400   -9.1800 -138.5900      27.0       356       103        60
OIR    2025130    131400   -9.1800 -138.6000      26.9       356       103        60
OIR    2025130    131400   -9.1800 -138.6100      26.7       356       103        60
OIR    2025130    131400   -9.1800 -138.6200      26.3       355       103        60
OIR    2025130    131400   -9.1800 -138.6300      26.1       354       103        60
OIR    2025130    131400   -9.1800 -138.6400      25.9       354       104        60
OIR    2025130    131400   -9.1800 -138.6500      25.7       354       104        60
OIR    2025130    131400   -9.1800 -138.6600      25.6       353       104        60
OIR    2025130    131400   -9.1800 -138.6700      25.4       353       104        60
OIR    2025130    131400   -9.1800 -138.6800      25.1       353       104        60
OIR    2025130    131400   -9.1800 -138.6900      24.7       351       104        60
OIR    2025130    131400   -9.1800 -138.7000      24.0       349       103        60
OIR    2025130    131400   -9.1800 -138.7100      23.2       347       103        60
OIR    2025130    131400   -9.1800 -138.7200      22.5       345       103        60
OIR    2025130    131400   -9.1800 -138.7300      21.8       343       103        60
OIR    2025130    131400   -9.1800 -138.7400      21.3       341       103        60
OIR    2025130    131400   -9.1800 -138.7500      20.9       338       105        60
OIR    2025130    131400   -9.1800 -138.7600      20.6       337       109        60
OIR    2025130    131400   -9.1800 -138.7700      20.2       336       110        60
OIR    2025130    131400   -9.1800 -138.7800      19.7       335       111        60
OIR    2025130    131400   -9.1800 -138.7900      18.8       331       113        60
OIR    2025130    131400   -9.1800 -138.8000      17.9       328       114        60
OIR    2025130    131400   -9.1800 -138.8100      17.3       325       116        60
OIR    2025130    131400   -9.1800 -138.8200      17.1       323       116        60
OIR    2025130    131400   -9.1800 -138.8300      16.9       322       117        60
OIR    2025130    131400   -9.1800 -138.8400      16.7       321       117        60
OIR    2025130    131400   -9.1800 -138.8500      16.4       319       119        60
OIR    2025130    131400   -9.1800 -138.8600      16.1       317       122        60
OIR    2025130    131400   -9.1800 -138.8700      15.9       315       125        60
OIR    2025130    131400   -9.1800 -138.8800      15.8       314       127        60
OIR    2025130    131400   -9.1800 -138.8900      15.7       313       129        60
OIR    2025130    131400   -9.1800 -138.9000      15.6       313       131        60
OIR    2025130    131400   -9.1800 -138.9100      15.5       312       133        60
OIR    2025130    131400   -9.1800 -138.9200      15.4       312       134        60
OIR    2025130    131400   -9.1800 -138.9300      15.3       312       136        60
OIR    2025130    131400   -9.1800 -138.9400      15.1       312       137        60
OIR    2025130    131400   -9.1800 -138.9500      14.6       312       135        60
OIR    2025130    131400   -9.1800 -138.9600      12.7       315       132        60
OIR    2025130    131400   -9.1800 -138.9700      12.3       314       133        60
OIR    2025130    131400   -9.1800 -138.9800      11.7       316       136        60
OIR    2025130    131400   -9.1800 -138.9900      11.4       317       143        60
OIR    2025130    131400   -9.1800 -139.0000      11.1       319       147        60
OIR    2025130    131400   -9.1900 -136.3200      39.9        95       140        60
OIR    2025130    131400   -9.1900 -136.3300      40.4        95       139        60
OIR    2025130    131400   -9.1900 -136.3400      40.6        95       139        60
OIR    2025130    131400   -9.1900 -136.5100      36.9        99       139        60
OIR    2025130    131400   -9.1900 -136.5200      36.3        99       135        60
OIR    2025130    131400   -9.1900 -136.5300      35.7        98       132        60
OIR    2025130    131400   -9.1900 -136.5400      35.0        98       130        60
OIR    2025130    131400   -9.1900 -136.5500      34.2        97       129        60
OIR    2025130    131400   -9.1900 -136.5600      33.5        97       130        60
OIR    2025130    131400   -9.1900 -136.5700      32.9        96       130        60
OIR    2025130    131400   -9.1900 -136.5800      32.3        96       131        60
OIR    2025130    131400   -9.1900 -136.5900      31.6        96       131        60
OIR    2025130    131400   -9.1900 -136.6000      31.1        96       130        60
OIR    2025130    131400   -9.1900 -136.6100      30.5        96       129        60
OIR    2025130    131400   -9.1900 -136.6200      29.8        94       127        60
OIR    2025130    131400   -9.1900 -136.6300      28.8        93       127        60
OIR    2025130    131400   -9.1900 -136.6400      28.1        91       127        60
OIR    2025130    131400   -9.1900 -136.6500      27.6        90       127        60
OIR    2025130    131400   -9.1900 -136.6600      27.4        89       125        60
OIR    2025130    131400   -9.1900 -136.6700      27.2        88       124        60
OIR    2025130    131400   -9.1900 -136.6800      27.2        87       123        60
OIR    2025130    131400   -9.1900 -136.6900      27.3        86       122        60
OIR    2025130    131400   -9.1900 -136.7000      27.4        85       120        60
OIR    2025130    131400   -9.1900 -136.7100      27.5        84       117        60
OIR    2025130    131400   -9.1900 -136.7200      27.4        83       120        60
OIR    2025130    131400   -9.1900 -136.7300      27.2        81       121        60
OIR    2025130    131400   -9.1900 -136.7400      27.0        80       121        60
OIR    2025130    131400   -9.1900 -136.7500      26.8        80       121        60
OIR    2025130    131400   -9.1900 -136.7600      26.5        79       122        60
OIR    2025130    131400   -9.1900 -136.7700      26.1        79       121        60
OIR    2025130    131400   -9.1900 -136.7800      25.7        78       119        60
OIR    2025130    131400   -9.1900 -136.7900      25.4        77       117        60
OIR    2025130    131400   -9.1900 -136.8000      25.2        77       116        60
OIR    2025130    131400   -9.1900 -136.8100      25.1        76       114        60
OIR    2025130    131400   -9.1900 -136.8200      25.0        76       112        60
OIR    2025130    131400   -9.1900 -136.8300      24.9        76       115        60
OIR    2025130    131400   -9.1900 -136.8400      24.9        76       116        60
OIR    2025130    131400   -9.1900 -136.8500      24.9        76       120        60
OIR    2025130    131400   -9.1900 -136.8600      25.0        76       122        60
OIR    2025130    131400   -9.1900 -136.8700      25.0        76       123        60
OIR    2025130    131400   -9.1900 -136.8800      25.1        77       124        60
OIR    2025130    131400   -9.1900 -136.8900      25.1        77       125        60
OIR    2025130    131400   -9.1900 -136.9000      25.2        77       125        60
OIR    2025130    131400   -9.1900 -136.9100      25.2        77       124        60
OIR    2025130    131400   -9.1900 -136.9200      25.2        77       121        60
OIR    2025130    131400   -9.1900 -136.9300      25.2        77       119        60
OIR    2025130    131400   -9.1900 -136.9400      25.2        77       115        60
OIR    2025130    131400   -9.1900 -136.9500      25.2        77       112        60
OIR    2025130    131400   -9.1900 -136.9600      25.2        77       111        60
OIR    2025130    131400   -9.1900 -136.9700      25.1        77       110        60
OIR    2025130    131400   -9.1900 -136.9800      25.1        77       110        60
OIR    2025130    131400   -9.1900 -136.9900      25.0        77       111        60
OIR    2025130    131400   -9.1900 -137.0000      24.9        77       112        60
OIR    2025130    131400   -9.1900 -137.0100      24.8        77       112        60
OIR    2025130    131400   -9.1900 -137.0200      24.6        77       110        60
OIR    2025130    131400   -9.1900 -137.0300      24.3        77       108        60
OIR    2025130    131400   -9.1900 -137.0400      24.0        77       107        60
OIR    2025130    131400   -9.1900 -137.0500      23.7        77       108        60
OIR    2025130    131400   -9.1900 -137.0600      23.6        78       108        60
OIR    2025130    131400   -9.1900 -137.0700      23.4        79       109        60
OIR    2025130    131400   -9.1900 -137.0800      23.2        80       110        60
OIR    2025130    131400   -9.1900 -137.0900      23.0        80       112        60
OIR    2025130    131400   -9.1900 -137.1000      22.8        81       113        60
OIR    2025130    131400   -9.1900 -137.1100      22.4        82       114        60
OIR    2025130    131400   -9.1900 -137.1200      22.0        83       114        60
OIR    2025130    131400   -9.1900 -137.1300      21.5        84       112        60
OIR    2025130    131400   -9.1900 -137.1400      21.1        85       111        60
OIR    2025130    131400   -9.1900 -137.1500      20.9        86       110        60
OIR    2025130    131400   -9.1900 -137.1600      20.7        86       110        60
OIR    2025130    131400   -9.1900 -137.1700      20.5        86       109        60
OIR    2025130    131400   -9.1900 -137.1800      20.4        86       109        60
OIR    2025130    131400   -9.1900 -137.1900      20.3        86       109        60
OIR    2025130    131400   -9.1900 -137.2000      20.2        85       110        60
OIR    2025130    131400   -9.1900 -137.2100      20.1        84       110        60
OIR    2025130    131400   -9.1900 -137.2200      19.8        83       111        60
OIR    2025130    131400   -9.1900 -137.2300      19.4        81       113        60
OIR    2025130    131400   -9.1900 -137.2400      18.9        80       115        60
OIR    2025130    131400   -9.1900 -137.2500      18.4        77       112        60
OIR    2025130    131400   -9.1900 -137.2600      18.1        75       110        60
OIR    2025130    131400   -9.1900 -137.2700      17.8        72       107        60
OIR    2025130    131400   -9.1900 -137.2800      17.7        70       104        60
OIR    2025130    131400   -9.1900 -137.2900      18.0        67       103        60
OIR    2025130    131400   -9.1900 -137.3000      18.3        66       103        60
OIR    2025130    131400   -9.1900 -137.3100      18.5        65       103        60
OIR    2025130    131400   -9.1900 -137.3200      18.4        64       103        60
OIR    2025130    131400   -9.1900 -137.3300      18.3        64       103        60
OIR    2025130    131400   -9.1900 -137.3400      18.3        63       103        60
OIR    2025130    131400   -9.1900 -137.3500      18.3        63       103        60
OIR    2025130    131400   -9.1900 -137.3600      18.3        62       103        60
OIR    2025130    131400   -9.1900 -137.3700      18.3        62       103        60
OIR    2025130    131400   -9.1900 -137.3800      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.3900      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4000      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4400      18.4        62       103        60
OIR    2025130    131400   -9.1900 -137.4500      17.9        60       103        60
OIR    2025130    131400   -9.1900 -137.4600      16.7        56       103        60
OIR    2025130    131400   -9.1900 -137.4700      15.7        53       103        60
OIR    2025130    131400   -9.1900 -137.4800      13.7        46       103        60
OIR    2025130    131400   -9.1900 -137.4900      12.6        37       103        60
OIR    2025130    131400   -9.1900 -137.5000      12.8        35       104        60
OIR    2025130    131400   -9.1900 -137.5100      13.6        34       112        60
OIR    2025130    131400   -9.1900 -137.5200      14.9        32       121        60
OIR    2025130    131400   -9.1900 -137.5300      16.0        23       130        60
OIR    2025130    131400   -9.1900 -137.5400      16.7        21       125        60
OIR    2025130    131400   -9.1900 -137.5500      16.9        21       119        60
OIR    2025130    131400   -9.1900 -137.5600      16.9        20       114        60
OIR    2025130    131400   -9.1900 -137.5700      16.9        19       110        60
OIR    2025130    131400   -9.1900 -137.5800      16.7        17       104        60
OIR    2025130    131400   -9.1900 -137.5900      16.4        13       104        60
OIR    2025130    131400   -9.1900 -137.6000      16.2        10       105        60
OIR    2025130    131400   -9.1900 -137.6100      16.4         5       108        60
OIR    2025130    131400   -9.1900 -137.6200      17.0         1       109        60
OIR    2025130    131400   -9.1900 -137.6300      17.5       359       115        60
OIR    2025130    131400   -9.1900 -137.6400      17.8       358       125        60
OIR    2025130    131400   -9.1900 -137.6500      18.1       356       127        60
OIR    2025130    131400   -9.1900 -137.6600      18.2       354       127        60
OIR    2025130    131400   -9.1900 -137.6700      18.3       352       130        60
OIR    2025130    131400   -9.1900 -137.6800      18.2       351       135        60
OIR    2025130    131400   -9.1900 -137.6900      18.1       349       143        60
OIR    2025130    131400   -9.1900 -137.7000      17.5       346       147        60
OIR    2025130    131400   -9.1900 -137.7100      16.4       345       144        60
OIR    2025130    131400   -9.1900 -137.7200      15.4       344       141        60
OIR    2025130    131400   -9.1900 -137.7300      14.9       344       136        60
OIR    2025130    131400   -9.1900 -137.7400      14.4       345       134        60
OIR    2025130    131400   -9.1900 -137.7500      13.8       345       135        60
OIR    2025130    131400   -9.1900 -137.7600      13.3       345       135        60
OIR    2025130    131400   -9.1900 -137.7700      12.0       343       135        60
OIR    2025130    131400   -9.1900 -137.7800       9.8       339       135        60
OIR    2025130    131400   -9.1900 -137.7900       6.3       317       134        60
OIR    2025130    131400   -9.1900 -137.8000       5.1       294       131        60
OIR    2025130    131400   -9.1900 -137.8100       4.8       286       129        60
OIR    2025130    131400   -9.1900 -137.8200       4.7       281       128        60
OIR    2025130    131400   -9.1900 -137.8300       4.6       277       128        60
OIR    2025130    131400   -9.1900 -137.8400       4.7       275       128        60
OIR    2025130    131400   -9.1900 -137.8500       4.7       272       127        60
OIR    2025130    131400   -9.1900 -137.8600       4.8       271       126        60
OIR    2025130    131400   -9.1900 -137.8700       4.8       269       125        60
OIR    2025130    131400   -9.1900 -137.8800       4.8       268       123        60
OIR    2025130    131400   -9.1900 -137.8900       4.8       267       122        60
OIR    2025130    131400   -9.1900 -137.9000       4.8       267       121        60
OIR    2025130    131400   -9.1900 -137.9100       5.1       266       123        60
OIR    2025130    131400   -9.1900 -137.9200       5.2       266       126        60
OIR    2025130    131400   -9.1900 -137.9300       5.3       265       129        60
OIR    2025130    131400   -9.1900 -137.9400       5.7       265       132        60
OIR    2025130    131400   -9.1900 -137.9500       6.0       264       138        60
OIR    2025130    131400   -9.1900 -137.9600       6.3       265       142        60
OIR    2025130    131400   -9.1900 -137.9700       7.4       266       145        60
OIR    2025130    131400   -9.1900 -137.9800      10.1       270       147        60
OIR    2025130    131400   -9.1900 -138.2400      20.2        40       143        60
OIR    2025130    131400   -9.1900 -138.2500      23.6        30       123        60
OIR    2025130    131400   -9.1900 -138.2600      22.4        16       105        60
OIR    2025130    131400   -9.1900 -138.2700      21.9         9       103        60
OIR    2025130    131400   -9.1900 -138.2800      22.4         9       103        60
OIR    2025130    131400   -9.1900 -138.2900      23.1         9       103        60
OIR    2025130    131400   -9.1900 -138.3000      23.6         9       103        60
OIR    2025130    131400   -9.1900 -138.3100      24.3         7       103        60
OIR    2025130    131400   -9.1900 -138.3200      25.1         6       103        60
OIR    2025130    131400   -9.1900 -138.3300      26.1         4       103        60
OIR    2025130    131400   -9.1900 -138.3400      26.7         2       103        60
OIR    2025130    131400   -9.1900 -138.3500      27.0         1       103        60
OIR    2025130    131400   -9.1900 -138.3600      27.2         0       103        60
OIR    2025130    131400   -9.1900 -138.3700      27.3       360       103        60
OIR    2025130    131400   -9.1900 -138.3800      27.4       359       103        60
OIR    2025130    131400   -9.1900 -138.3900      27.5       359       103        60
OIR    2025130    131400   -9.1900 -138.4000      27.6       359       103        60
OIR    2025130    131400   -9.1900 -138.4100      27.6       358       103        60
OIR    2025130    131400   -9.1900 -138.4200      27.7       358       103        60
OIR    2025130    131400   -9.1900 -138.4300      27.7       358       103        60
OIR    2025130    131400   -9.1900 -138.4400      27.8       358       103        60
OIR    2025130    131400   -9.1900 -138.4500      27.7       358       103        60
OIR    2025130    131400   -9.1900 -138.4600      27.7       357       103        60
OIR    2025130    131400   -9.1900 -138.4700      27.7       357       103        60
OIR    2025130    131400   -9.1900 -138.4800      27.6       357       103        60
OIR    2025130    131400   -9.1900 -138.4900      27.5       357       103        60
OIR    2025130    131400   -9.1900 -138.5000      27.4       357       103        60
OIR    2025130    131400   -9.1900 -138.5100      27.4       357       103        60
OIR    2025130    131400   -9.1900 -138.5200      27.3       357       103        60
OIR    2025130    131400   -9.1900 -138.5300      27.3       357       103        60
OIR    2025130    131400   -9.1900 -138.5400      27.2       357       103        60
OIR    2025130    131400   -9.1900 -138.5500      27.2       357       103        60
OIR    2025130    131400   -9.1900 -138.5600      27.2       357       103        60
OIR    2025130    131400   -9.1900 -138.5700      27.2       357       103        60
OIR    2025130    131400   -9.1900 -138.5800      27.1       356       103        60
OIR    2025130    131400   -9.1900 -138.5900      27.1       356       103        60
OIR    2025130    131400   -9.1900 -138.6000      27.0       356       103        60
OIR    2025130    131400   -9.1900 -138.6100      26.8       355       103        60
OIR    2025130    131400   -9.1900 -138.6200      26.5       355       103        60
OIR    2025130    131400   -9.1900 -138.6300      26.3       354       103        60
OIR    2025130    131400   -9.1900 -138.6400      26.0       354       103        60
OIR    2025130    131400   -9.1900 -138.6500      25.9       353       103        60
OIR    2025130    131400   -9.1900 -138.6600      25.7       353       104        60
OIR    2025130    131400   -9.1900 -138.6700      25.5       353       104        60
OIR    2025130    131400   -9.1900 -138.6800      25.1       352       103        60
OIR    2025130    131400   -9.1900 -138.6900      24.5       350       103        60
OIR    2025130    131400   -9.1900 -138.7000      23.7       348       103        60
OIR    2025130    131400   -9.1900 -138.7100      23.0       346       103        60
OIR    2025130    131400   -9.1900 -138.7200      22.3       344       103        60
OIR    2025130    131400   -9.1900 -138.7300      21.8       341       103        60
OIR    2025130    131400   -9.1900 -138.7400      21.4       340       104        60
OIR    2025130    131400   -9.1900 -138.7500      21.1       338       105        60
OIR    2025130    131400   -9.1900 -138.7600      20.8       337       107        60
OIR    2025130    131400   -9.1900 -138.7700      20.4       336       108        60
OIR    2025130    131400   -9.1900 -138.7800      20.0       335       110        60
OIR    2025130    131400   -9.1900 -138.7900      19.0       332       111        60
OIR    2025130    131400   -9.1900 -138.8000      18.0       327       112        60
OIR    2025130    131400   -9.1900 -138.8100      17.5       325       115        60
OIR    2025130    131400   -9.1900 -138.8200      17.3       323       116        60
OIR    2025130    131400   -9.1900 -138.8300      17.1       322       119        60
OIR    2025130    131400   -9.1900 -138.8400      17.0       321       119        60
OIR    2025130    131400   -9.1900 -138.8500      16.7       318       119        60
OIR    2025130    131400   -9.1900 -138.8600      16.5       316       119        60
OIR    2025130    131400   -9.1900 -138.8700      16.2       315       121        60
OIR    2025130    131400   -9.1900 -138.8800      15.9       314       124        60
OIR    2025130    131400   -9.1900 -138.8900      15.8       313       127        60
OIR    2025130    131400   -9.1900 -138.9000      15.7       312       130        60
OIR    2025130    131400   -9.1900 -138.9100      15.7       312       132        60
OIR    2025130    131400   -9.1900 -138.9200      15.6       311       134        60
OIR    2025130    131400   -9.1900 -138.9300      15.4       311       137        60
OIR    2025130    131400   -9.1900 -138.9400      15.3       310       138        60
OIR    2025130    131400   -9.1900 -138.9500      14.9       311       135        60
OIR    2025130    131400   -9.1900 -138.9600      13.1       313       133        60
OIR    2025130    131400   -9.1900 -138.9700      12.7       313       134        60
OIR    2025130    131400   -9.1900 -138.9800      11.9       314       136        60
OIR    2025130    131400   -9.1900 -138.9900      11.4       317       138        60
OIR    2025130    131400   -9.1900 -139.0000      11.2       319       143        60
OIR    2025130    131400   -9.1900 -139.0100      10.9       320       147        60
OIR    2025130    131400   -9.2000 -136.3200      39.9        94       144        60
OIR    2025130    131400   -9.2000 -136.3300      40.3        95       142        60
OIR    2025130    131400   -9.2000 -136.3400      40.5        95       140        60
OIR    2025130    131400   -9.2000 -136.5100      36.8        97       139        60
OIR    2025130    131400   -9.2000 -136.5200      36.0        97       135        60
OIR    2025130    131400   -9.2000 -136.5300      35.0        96       132        60
OIR    2025130    131400   -9.2000 -136.5400      34.2        95       129        60
OIR    2025130    131400   -9.2000 -136.5500      33.4        95       129        60
OIR    2025130    131400   -9.2000 -136.5600      32.8        94       129        60
OIR    2025130    131400   -9.2000 -136.5700      32.4        94       129        60
OIR    2025130    131400   -9.2000 -136.5800      32.0        95       130        60
OIR    2025130    131400   -9.2000 -136.5900      31.5        95       130        60
OIR    2025130    131400   -9.2000 -136.6000      30.9        95       129        60
OIR    2025130    131400   -9.2000 -136.6100      30.1        94       128        60
OIR    2025130    131400   -9.2000 -136.6200      29.3        93       127        60
OIR    2025130    131400   -9.2000 -136.6300      28.4        91       127        60
OIR    2025130    131400   -9.2000 -136.6400      27.7        90       126        60
OIR    2025130    131400   -9.2000 -136.6500      27.3        89       125        60
OIR    2025130    131400   -9.2000 -136.6600      27.0        88       124        60
OIR    2025130    131400   -9.2000 -136.6700      26.8        87       123        60
OIR    2025130    131400   -9.2000 -136.6800      26.7        85       122        60
OIR    2025130    131400   -9.2000 -136.6900      26.7        84       121        60
OIR    2025130    131400   -9.2000 -136.7000      26.8        82       120        60
OIR    2025130    131400   -9.2000 -136.7100      26.7        81       119        60
OIR    2025130    131400   -9.2000 -136.7200      26.7        80       119        60
OIR    2025130    131400   -9.2000 -136.7300      26.7        80       120        60
OIR    2025130    131400   -9.2000 -136.7400      26.7        79       119        60
OIR    2025130    131400   -9.2000 -136.7500      26.6        79       119        60
OIR    2025130    131400   -9.2000 -136.7600      26.4        79       119        60
OIR    2025130    131400   -9.2000 -136.7700      26.1        78       119        60
OIR    2025130    131400   -9.2000 -136.7800      25.7        77       117        60
OIR    2025130    131400   -9.2000 -136.7900      25.4        77       117        60
OIR    2025130    131400   -9.2000 -136.8000      25.2        76       117        60
OIR    2025130    131400   -9.2000 -136.8100      25.1        76       116        60
OIR    2025130    131400   -9.2000 -136.8200      25.0        75       116        60
OIR    2025130    131400   -9.2000 -136.8300      25.0        75       116        60
OIR    2025130    131400   -9.2000 -136.8400      25.0        75       117        60
OIR    2025130    131400   -9.2000 -136.8500      25.0        75       121        60
OIR    2025130    131400   -9.2000 -136.8600      25.0        76       123        60
OIR    2025130    131400   -9.2000 -136.8700      25.1        76       124        60
OIR    2025130    131400   -9.2000 -136.8800      25.1        76       124        60
OIR    2025130    131400   -9.2000 -136.8900      25.2        76       124        60
OIR    2025130    131400   -9.2000 -136.9000      25.2        77       123        60
OIR    2025130    131400   -9.2000 -136.9100      25.2        77       122        60
OIR    2025130    131400   -9.2000 -136.9200      25.2        77       119        60
OIR    2025130    131400   -9.2000 -136.9300      25.3        77       116        60
OIR    2025130    131400   -9.2000 -136.9400      25.3        77       114        60
OIR    2025130    131400   -9.2000 -136.9500      25.3        77       112        60
OIR    2025130    131400   -9.2000 -136.9600      25.2        77       111        60
OIR    2025130    131400   -9.2000 -136.9700      25.2        77       111        60
OIR    2025130    131400   -9.2000 -136.9800      25.1        77       112        60
OIR    2025130    131400   -9.2000 -136.9900      25.1        77       111        60
OIR    2025130    131400   -9.2000 -137.0000      25.0        77       111        60
OIR    2025130    131400   -9.2000 -137.0100      24.9        77       110        60
OIR    2025130    131400   -9.2000 -137.0200      24.7        76       109        60
OIR    2025130    131400   -9.2000 -137.0300      24.5        76       108        60
OIR    2025130    131400   -9.2000 -137.0400      24.3        76       107        60
OIR    2025130    131400   -9.2000 -137.0500      24.1        76       108        60
OIR    2025130    131400   -9.2000 -137.0600      23.9        77       108        60
OIR    2025130    131400   -9.2000 -137.0700      23.8        77       110        60
OIR    2025130    131400   -9.2000 -137.0800      23.6        78       111        60
OIR    2025130    131400   -9.2000 -137.0900      23.4        79       112        60
OIR    2025130    131400   -9.2000 -137.1000      23.2        80       113        60
OIR    2025130    131400   -9.2000 -137.1100      22.8        80       113        60
OIR    2025130    131400   -9.2000 -137.1200      22.4        81       113        60
OIR    2025130    131400   -9.2000 -137.1300      22.0        82       113        60
OIR    2025130    131400   -9.2000 -137.1400      21.5        83       112        60
OIR    2025130    131400   -9.2000 -137.1500      21.2        84       111        60
OIR    2025130    131400   -9.2000 -137.1600      21.0        84       109        60
OIR    2025130    131400   -9.2000 -137.1700      20.9        84       108        60
OIR    2025130    131400   -9.2000 -137.1800      20.8        84       109        60
OIR    2025130    131400   -9.2000 -137.1900      20.7        84       109        60
OIR    2025130    131400   -9.2000 -137.2000      20.7        83       110        60
OIR    2025130    131400   -9.2000 -137.2100      20.7        82       110        60
OIR    2025130    131400   -9.2000 -137.2200      20.5        80       111        60
OIR    2025130    131400   -9.2000 -137.2300      20.2        79       113        60
OIR    2025130    131400   -9.2000 -137.2400      19.7        78       115        60
OIR    2025130    131400   -9.2000 -137.2500      19.2        76       112        60
OIR    2025130    131400   -9.2000 -137.2600      18.6        74       110        60
OIR    2025130    131400   -9.2000 -137.2700      18.2        71       108        60
OIR    2025130    131400   -9.2000 -137.2800      18.1        68       104        60
OIR    2025130    131400   -9.2000 -137.2900      18.4        66       104        60
OIR    2025130    131400   -9.2000 -137.3000      18.8        65       103        60
OIR    2025130    131400   -9.2000 -137.3100      18.8        64       103        60
OIR    2025130    131400   -9.2000 -137.3200      18.8        63       103        60
OIR    2025130    131400   -9.2000 -137.3300      18.7        63       103        60
OIR    2025130    131400   -9.2000 -137.3400      18.6        63       103        60
OIR    2025130    131400   -9.2000 -137.3500      18.5        62       103        60
OIR    2025130    131400   -9.2000 -137.3600      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.3700      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.3800      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.3900      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4000      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4400      18.4        62       103        60
OIR    2025130    131400   -9.2000 -137.4500      17.7        59       103        60
OIR    2025130    131400   -9.2000 -137.4600      16.1        55       103        60
OIR    2025130    131400   -9.2000 -137.4700      14.4        51       103        60
OIR    2025130    131400   -9.2000 -137.4800      12.6        45       103        60
OIR    2025130    131400   -9.2000 -137.4900      11.9        39       103        60
OIR    2025130    131400   -9.2000 -137.5000      12.1        37       104        60
OIR    2025130    131400   -9.2000 -137.5100      12.8        36       111        60
OIR    2025130    131400   -9.2000 -137.5200      14.1        33       119        60
OIR    2025130    131400   -9.2000 -137.5300      15.3        24       128        60
OIR    2025130    131400   -9.2000 -137.5400      16.6        21       127        60
OIR    2025130    131400   -9.2000 -137.5500      16.7        21       125        60
OIR    2025130    131400   -9.2000 -137.5600      16.8        20       119        60
OIR    2025130    131400   -9.2000 -137.5700      16.8        19       113        60
OIR    2025130    131400   -9.2000 -137.5800      16.4        16       110        60
OIR    2025130    131400   -9.2000 -137.5900      15.9        12       109        60
OIR    2025130    131400   -9.2000 -137.6000      15.7         6       109        60
OIR    2025130    131400   -9.2000 -137.6100      16.3         0       110        60
OIR    2025130    131400   -9.2000 -137.6200      17.1       358       116        60
OIR    2025130    131400   -9.2000 -137.6300      17.7       357       125        60
OIR    2025130    131400   -9.2000 -137.6400      18.0       356       133        60
OIR    2025130    131400   -9.2000 -137.6500      18.1       355       133        60
OIR    2025130    131400   -9.2000 -137.6600      18.2       354       131        60
OIR    2025130    131400   -9.2000 -137.6700      18.1       352       132        60
OIR    2025130    131400   -9.2000 -137.6800      18.0       351       135        60
OIR    2025130    131400   -9.2000 -137.6900      17.7       348       140        60
OIR    2025130    131400   -9.2000 -137.7000      17.1       346       143        60
OIR    2025130    131400   -9.2000 -137.7100      16.1       346       140        60
OIR    2025130    131400   -9.2000 -137.7200      15.2       344       136        60
OIR    2025130    131400   -9.2000 -137.7300      14.6       345       133        60
OIR    2025130    131400   -9.2000 -137.7400      14.1       345       131        60
OIR    2025130    131400   -9.2000 -137.7500      13.6       345       131        60
OIR    2025130    131400   -9.2000 -137.7600      12.8       344       132        60
OIR    2025130    131400   -9.2000 -137.7700      11.4       342       132        60
OIR    2025130    131400   -9.2000 -137.7800       9.2       336       132        60
OIR    2025130    131400   -9.2000 -137.7900       6.2       312       131        60
OIR    2025130    131400   -9.2000 -137.8000       5.3       292       130        60
OIR    2025130    131400   -9.2000 -137.8100       5.2       286       129        60
OIR    2025130    131400   -9.2000 -137.8200       5.1       283       128        60
OIR    2025130    131400   -9.2000 -137.8300       5.0       279       128        60
OIR    2025130    131400   -9.2000 -137.8400       5.0       277       128        60
OIR    2025130    131400   -9.2000 -137.8500       5.0       274       128        60
OIR    2025130    131400   -9.2000 -137.8600       5.0       273       128        60
OIR    2025130    131400   -9.2000 -137.8700       5.1       272       126        60
OIR    2025130    131400   -9.2000 -137.8800       5.1       270       125        60
OIR    2025130    131400   -9.2000 -137.8900       5.1       269       124        60
OIR    2025130    131400   -9.2000 -137.9000       5.1       269       123        60
OIR    2025130    131400   -9.2000 -137.9100       5.3       268       124        60
OIR    2025130    131400   -9.2000 -137.9200       5.4       267       126        60
OIR    2025130    131400   -9.2000 -137.9300       5.5       267       128        60
OIR    2025130    131400   -9.2000 -137.9400       5.8       266       131        60
OIR    2025130    131400   -9.2000 -137.9500       6.1       266       136        60
OIR    2025130    131400   -9.2000 -137.9600       6.3       266       140        60
OIR    2025130    131400   -9.2000 -137.9700       7.4       266       143        60
OIR    2025130    131400   -9.2000 -137.9800       9.8       269       145        60
OIR    2025130    131400   -9.2000 -137.9900      10.4       270       147        60
OIR    2025130    131400   -9.2000 -138.2500      21.8        28       134        60
OIR    2025130    131400   -9.2000 -138.2600      23.0        22       107        60
OIR    2025130    131400   -9.2000 -138.2700      21.6         8       103        60
OIR    2025130    131400   -9.2000 -138.2800      22.4         9       103        60
OIR    2025130    131400   -9.2000 -138.2900      23.3        10       103        60
OIR    2025130    131400   -9.2000 -138.3000      24.0         9       103        60
OIR    2025130    131400   -9.2000 -138.3100      24.7         8       103        60
OIR    2025130    131400   -9.2000 -138.3200      25.4         7       103        60
OIR    2025130    131400   -9.2000 -138.3300      26.2         5       103        60
OIR    2025130    131400   -9.2000 -138.3400      26.6         3       103        60
OIR    2025130    131400   -9.2000 -138.3500      27.1         1       103        60
OIR    2025130    131400   -9.2000 -138.3600      27.3         0       103        60
OIR    2025130    131400   -9.2000 -138.3700      27.4       360       103        60
OIR    2025130    131400   -9.2000 -138.3800      27.5       360       103        60
OIR    2025130    131400   -9.2000 -138.3900      27.6       359       103        60
OIR    2025130    131400   -9.2000 -138.4000      27.7       359       103        60
OIR    2025130    131400   -9.2000 -138.4100      27.8       358       103        60
OIR    2025130    131400   -9.2000 -138.4200      27.9       358       103        60
OIR    2025130    131400   -9.2000 -138.4300      27.9       358       103        60
OIR    2025130    131400   -9.2000 -138.4400      27.9       358       103        60
OIR    2025130    131400   -9.2000 -138.4500      27.9       358       103        60
OIR    2025130    131400   -9.2000 -138.4600      27.9       357       103        60
OIR    2025130    131400   -9.2000 -138.4700      27.8       357       103        60
OIR    2025130    131400   -9.2000 -138.4800      27.8       357       103        60
OIR    2025130    131400   -9.2000 -138.4900      27.7       357       103        60
OIR    2025130    131400   -9.2000 -138.5000      27.6       357       103        60
OIR    2025130    131400   -9.2000 -138.5100      27.5       357       103        60
OIR    2025130    131400   -9.2000 -138.5200      27.4       357       103        60
OIR    2025130    131400   -9.2000 -138.5300      27.3       357       103        60
OIR    2025130    131400   -9.2000 -138.5400      27.3       357       103        60
OIR    2025130    131400   -9.2000 -138.5500      27.3       357       103        60
OIR    2025130    131400   -9.2000 -138.5600      27.2       357       103        60
OIR    2025130    131400   -9.2000 -138.5700      27.2       357       103        60
OIR    2025130    131400   -9.2000 -138.5800      27.2       356       103        60
OIR    2025130    131400   -9.2000 -138.5900      27.1       356       103        60
OIR    2025130    131400   -9.2000 -138.6000      27.0       356       103        60
OIR    2025130    131400   -9.2000 -138.6100      26.9       355       103        60
OIR    2025130    131400   -9.2000 -138.6200      26.7       354       103        60
OIR    2025130    131400   -9.2000 -138.6300      26.4       354       103        60
OIR    2025130    131400   -9.2000 -138.6400      26.2       353       103        60
OIR    2025130    131400   -9.2000 -138.6500      26.0       353       103        60
OIR    2025130    131400   -9.2000 -138.6600      25.8       353       103        60
OIR    2025130    131400   -9.2000 -138.6700      25.5       352       103        60
OIR    2025130    131400   -9.2000 -138.6800      25.0       351       103        60
OIR    2025130    131400   -9.2000 -138.6900      24.4       349       103        60
OIR    2025130    131400   -9.2000 -138.7000      23.7       347       103        60
OIR    2025130    131400   -9.2000 -138.7100      23.1       344       103        60
OIR    2025130    131400   -9.2000 -138.7200      22.5       343       103        60
OIR    2025130    131400   -9.2000 -138.7300      21.9       341       104        60
OIR    2025130    131400   -9.2000 -138.7400      21.5       339       105        60
OIR    2025130    131400   -9.2000 -138.7500      21.2       338       105        60
OIR    2025130    131400   -9.2000 -138.7600      21.0       337       107        60
OIR    2025130    131400   -9.2000 -138.7700      20.6       336       108        60
OIR    2025130    131400   -9.2000 -138.7800      20.2       335       109        60
OIR    2025130    131400   -9.2000 -138.7900      19.4       332       111        60
OIR    2025130    131400   -9.2000 -138.8000      18.3       328       113        60
OIR    2025130    131400   -9.2000 -138.8100      17.8       325       116        60
OIR    2025130    131400   -9.2000 -138.8200      17.5       323       117        60
OIR    2025130    131400   -9.2000 -138.8300      17.3       321       117        60
OIR    2025130    131400   -9.2000 -138.8400      17.2       320       116        60
OIR    2025130    131400   -9.2000 -138.8500      17.1       318       116        60
OIR    2025130    131400   -9.2000 -138.8600      17.0       316       119        60
OIR    2025130    131400   -9.2000 -138.8700      16.7       315       121        60
OIR    2025130    131400   -9.2000 -138.8800      16.2       314       122        60
OIR    2025130    131400   -9.2000 -138.8900      16.0       313       124        60
OIR    2025130    131400   -9.2000 -138.9000      15.9       312       126        60
OIR    2025130    131400   -9.2000 -138.9100      15.8       311       129        60
OIR    2025130    131400   -9.2000 -138.9200      15.7       311       133        60
OIR    2025130    131400   -9.2000 -138.9300      15.6       310       136        60
OIR    2025130    131400   -9.2000 -138.9400      15.4       310       138        60
OIR    2025130    131400   -9.2000 -138.9500      15.1       310       137        60
OIR    2025130    131400   -9.2000 -138.9600      13.5       312       137        60
OIR    2025130    131400   -9.2000 -138.9700      13.0       313       137        60
OIR    2025130    131400   -9.2000 -138.9800      12.2       314       137        60
OIR    2025130    131400   -9.2000 -138.9900      11.5       316       138        60
OIR    2025130    131400   -9.2000 -139.0000      11.2       318       143        60
OIR    2025130    131400   -9.2100 -136.2700      39.1        94       143        60
OIR    2025130    131400   -9.2100 -136.5100      36.5        96       141        60
OIR    2025130    131400   -9.2100 -136.5200      35.4        95       136        60
OIR    2025130    131400   -9.2100 -136.5300      34.5        95       131        60
OIR    2025130    131400   -9.2100 -136.5400      33.6        94       129        60
OIR    2025130    131400   -9.2100 -136.5500      33.0        94       129        60
OIR    2025130    131400   -9.2100 -136.5600      32.6        94       128        60
OIR    2025130    131400   -9.2100 -136.5700      32.2        94       128        60
OIR    2025130    131400   -9.2100 -136.5800      31.9        94       129        60
OIR    2025130    131400   -9.2100 -136.5900      31.4        94       128        60
OIR    2025130    131400   -9.2100 -136.6000      30.7        94       127        60
OIR    2025130    131400   -9.2100 -136.6100      29.8        93       127        60
OIR    2025130    131400   -9.2100 -136.6200      28.7        91       127        60
OIR    2025130    131400   -9.2100 -136.6300      27.9        89       126        60
OIR    2025130    131400   -9.2100 -136.6400      27.3        88       125        60
OIR    2025130    131400   -9.2100 -136.6500      27.0        87       124        60
OIR    2025130    131400   -9.2100 -136.6600      26.7        86       123        60
OIR    2025130    131400   -9.2100 -136.6700      26.4        85       122        60
OIR    2025130    131400   -9.2100 -136.6800      26.3        84       121        60
OIR    2025130    131400   -9.2100 -136.6900      26.4        82       120        60
OIR    2025130    131400   -9.2100 -136.7000      26.4        81       120        60
OIR    2025130    131400   -9.2100 -136.7100      26.5        80       119        60
OIR    2025130    131400   -9.2100 -136.7200      26.5        80       119        60
OIR    2025130    131400   -9.2100 -136.7300      26.5        79       117        60
OIR    2025130    131400   -9.2100 -136.7400      26.6        79       116        60
OIR    2025130    131400   -9.2100 -136.7500      26.5        78       116        60
OIR    2025130    131400   -9.2100 -136.7600      26.4        78       116        60
OIR    2025130    131400   -9.2100 -136.7700      26.2        77       116        60
OIR    2025130    131400   -9.2100 -136.7800      25.7        76       116        60
OIR    2025130    131400   -9.2100 -136.7900      25.4        76       116        60
OIR    2025130    131400   -9.2100 -136.8000      25.3        76       119        60
OIR    2025130    131400   -9.2100 -136.8100      25.1        75       119        60
OIR    2025130    131400   -9.2100 -136.8200      25.0        75       119        60
OIR    2025130    131400   -9.2100 -136.8300      25.0        75       119        60
OIR    2025130    131400   -9.2100 -136.8400      25.0        75       119        60
OIR    2025130    131400   -9.2100 -136.8500      25.0        75       123        60
OIR    2025130    131400   -9.2100 -136.8600      25.0        76       125        60
OIR    2025130    131400   -9.2100 -136.8700      25.1        76       125        60
OIR    2025130    131400   -9.2100 -136.8800      25.2        76       124        60
OIR    2025130    131400   -9.2100 -136.8900      25.2        76       123        60
OIR    2025130    131400   -9.2100 -136.9000      25.2        76       121        60
OIR    2025130    131400   -9.2100 -136.9100      25.2        76       120        60
OIR    2025130    131400   -9.2100 -136.9200      25.3        76       116        60
OIR    2025130    131400   -9.2100 -136.9300      25.3        76       115        60
OIR    2025130    131400   -9.2100 -136.9400      25.3        77       113        60
OIR    2025130    131400   -9.2100 -136.9500      25.3        77       112        60
OIR    2025130    131400   -9.2100 -136.9600      25.3        77       112        60
OIR    2025130    131400   -9.2100 -136.9700      25.2        76       113        60
OIR    2025130    131400   -9.2100 -136.9800      25.2        76       113        60
OIR    2025130    131400   -9.2100 -136.9900      25.1        76       112        60
OIR    2025130    131400   -9.2100 -137.0000      25.1        76       110        60
OIR    2025130    131400   -9.2100 -137.0100      25.0        76       109        60
OIR    2025130    131400   -9.2100 -137.0200      24.9        76       108        60
OIR    2025130    131400   -9.2100 -137.0300      24.7        76       108        60
OIR    2025130    131400   -9.2100 -137.0400      24.6        76       108        60
OIR    2025130    131400   -9.2100 -137.0500      24.4        76       108        60
OIR    2025130    131400   -9.2100 -137.0600      24.2        76       108        60
OIR    2025130    131400   -9.2100 -137.0700      24.0        76       111        60
OIR    2025130    131400   -9.2100 -137.0800      23.9        77       113        60
OIR    2025130    131400   -9.2100 -137.0900      23.8        77       113        60
OIR    2025130    131400   -9.2100 -137.1000      23.6        78       113        60
OIR    2025130    131400   -9.2100 -137.1100      23.3        78       113        60
OIR    2025130    131400   -9.2100 -137.1200      23.0        79       113        60
OIR    2025130    131400   -9.2100 -137.1300      22.6        80       114        60
OIR    2025130    131400   -9.2100 -137.1400      22.1        81       112        60
OIR    2025130    131400   -9.2100 -137.1500      21.6        82       111        60
OIR    2025130    131400   -9.2100 -137.1600      21.3        83       109        60
OIR    2025130    131400   -9.2100 -137.1700      21.3        82       108        60
OIR    2025130    131400   -9.2100 -137.1800      21.4        81       108        60
OIR    2025130    131400   -9.2100 -137.1900      21.6        80       109        60
OIR    2025130    131400   -9.2100 -137.2000      21.6        79       109        60
OIR    2025130    131400   -9.2100 -137.2100      21.6        79       110        60
OIR    2025130    131400   -9.2100 -137.2200      21.5        78       110        60
OIR    2025130    131400   -9.2100 -137.2300      21.2        77       112        60
OIR    2025130    131400   -9.2100 -137.2400      20.9        76       115        60
OIR    2025130    131400   -9.2100 -137.2500      20.3        75       113        60
OIR    2025130    131400   -9.2100 -137.2600      19.5        73       110        60
OIR    2025130    131400   -9.2100 -137.2700      18.8        70       108        60
OIR    2025130    131400   -9.2100 -137.2800      18.7        67       105        60
OIR    2025130    131400   -9.2100 -137.2900      18.9        65       104        60
OIR    2025130    131400   -9.2100 -137.3000      19.1        64       103        60
OIR    2025130    131400   -9.2100 -137.3100      19.0        63       103        60
OIR    2025130    131400   -9.2100 -137.3200      19.0        63       103        60
OIR    2025130    131400   -9.2100 -137.3300      18.8        63       103        60
OIR    2025130    131400   -9.2100 -137.3400      18.7        62       103        60
OIR    2025130    131400   -9.2100 -137.3500      18.6        62       103        60
OIR    2025130    131400   -9.2100 -137.3600      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.3700      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.3800      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.3900      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.4100      18.5        62       103        60
OIR    2025130    131400   -9.2100 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.2100 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.2100 -137.4400      18.3        61       103        60
OIR    2025130    131400   -9.2100 -137.4500      17.3        58       103        60
OIR    2025130    131400   -9.2100 -137.4600      15.0        50       103        60
OIR    2025130    131400   -9.2100 -137.4700      13.1        47       103        60
OIR    2025130    131400   -9.2100 -137.4800      11.9        45       103        60
OIR    2025130    131400   -9.2100 -137.4900      11.3        41       103        60
OIR    2025130    131400   -9.2100 -137.5000      11.4        40       104        60
OIR    2025130    131400   -9.2100 -137.5100      12.0        38       109        60
OIR    2025130    131400   -9.2100 -137.5200      13.1        32       116        60
OIR    2025130    131400   -9.2100 -137.5300      15.2        25       126        60
OIR    2025130    131400   -9.2100 -137.5400      16.5        22       128        60
OIR    2025130    131400   -9.2100 -137.5500      16.7        21       130        60
OIR    2025130    131400   -9.2100 -137.5600      16.5        20       125        60
OIR    2025130    131400   -9.2100 -137.5700      15.6        17       117        60
OIR    2025130    131400   -9.2100 -137.5800      13.9        12       116        60
OIR    2025130    131400   -9.2100 -137.5900      12.8         7       115        60
OIR    2025130    131400   -9.2100 -137.6000      12.7         3       114        60
OIR    2025130    131400   -9.2100 -137.6100      14.2       358       115        60
OIR    2025130    131400   -9.2100 -137.6200      16.6       356       126        60
OIR    2025130    131400   -9.2100 -137.6300      17.7       356       134        60
OIR    2025130    131400   -9.2100 -137.6400      18.0       356       139        60
OIR    2025130    131400   -9.2100 -137.6500      18.1       354       137        60
OIR    2025130    131400   -9.2100 -137.6600      18.1       354       134        60
OIR    2025130    131400   -9.2100 -137.6700      17.9       352       134        60
OIR    2025130    131400   -9.2100 -137.6800      17.6       350       134        60
OIR    2025130    131400   -9.2100 -137.6900      17.0       348       138        60
OIR    2025130    131400   -9.2100 -137.7000      16.3       346       138        60
OIR    2025130    131400   -9.2100 -137.7100      15.4       345       136        60
OIR    2025130    131400   -9.2100 -137.7200      14.7       344       133        60
OIR    2025130    131400   -9.2100 -137.7300      14.2       344       131        60
OIR    2025130    131400   -9.2100 -137.7400      13.6       344       129        60
OIR    2025130    131400   -9.2100 -137.7500      13.0       344       129        60
OIR    2025130    131400   -9.2100 -137.7600      11.7       342       129        60
OIR    2025130    131400   -9.2100 -137.7700      10.0       339       129        60
OIR    2025130    131400   -9.2100 -137.7800       7.9       329       129        60
OIR    2025130    131400   -9.2100 -137.7900       5.9       305       129        60
OIR    2025130    131400   -9.2100 -137.8000       5.4       289       129        60
OIR    2025130    131400   -9.2100 -137.8100       5.4       285       129        60
OIR    2025130    131400   -9.2100 -137.8200       5.3       283       128        60
OIR    2025130    131400   -9.2100 -137.8300       5.2       281       128        60
OIR    2025130    131400   -9.2100 -137.8400       5.2       278       128        60
OIR    2025130    131400   -9.2100 -137.8500       5.2       276       128        60
OIR    2025130    131400   -9.2100 -137.8600       5.2       274       129        60
OIR    2025130    131400   -9.2100 -137.8700       5.2       273       128        60
OIR    2025130    131400   -9.2100 -137.8800       5.3       272       126        60
OIR    2025130    131400   -9.2100 -137.8900       5.3       271       126        60
OIR    2025130    131400   -9.2100 -137.9000       5.3       270       125        60
OIR    2025130    131400   -9.2100 -137.9100       5.5       269       125        60
OIR    2025130    131400   -9.2100 -137.9200       5.5       269       126        60
OIR    2025130    131400   -9.2100 -137.9300       5.7       268       128        60
OIR    2025130    131400   -9.2100 -137.9400       5.9       268       131        60
OIR    2025130    131400   -9.2100 -137.9500       6.1       267       135        60
OIR    2025130    131400   -9.2100 -137.9600       6.5       267       139        60
OIR    2025130    131400   -9.2100 -137.9700       7.4       267       142        60
OIR    2025130    131400   -9.2100 -137.9800       9.3       269       143        60
OIR    2025130    131400   -9.2100 -137.9900       9.9       270       145        60
OIR    2025130    131400   -9.2100 -138.2500      18.5        29       141        60
OIR    2025130    131400   -9.2100 -138.2600      21.2        27       108        60
OIR    2025130    131400   -9.2100 -138.2700      21.8        14       103        60
OIR    2025130    131400   -9.2100 -138.2800      22.8        12       103        60
OIR    2025130    131400   -9.2100 -138.2900      23.8        11       103        60
OIR    2025130    131400   -9.2100 -138.3000      24.6        10       103        60
OIR    2025130    131400   -9.2100 -138.3100      25.2         9       103        60
OIR    2025130    131400   -9.2100 -138.3200      25.9         8       103        60
OIR    2025130    131400   -9.2100 -138.3300      26.4         6       103        60
OIR    2025130    131400   -9.2100 -138.3400      26.8         4       103        60
OIR    2025130    131400   -9.2100 -138.3500      27.2         1       103        60
OIR    2025130    131400   -9.2100 -138.3600      27.4         1       103        60
OIR    2025130    131400   -9.2100 -138.3700      27.6         0       103        60
OIR    2025130    131400   -9.2100 -138.3800      27.7       360       103        60
OIR    2025130    131400   -9.2100 -138.3900      27.8       359       103        60
OIR    2025130    131400   -9.2100 -138.4000      27.9       359       103        60
OIR    2025130    131400   -9.2100 -138.4100      28.0       358       103        60
OIR    2025130    131400   -9.2100 -138.4200      28.0       358       103        60
OIR    2025130    131400   -9.2100 -138.4300      28.1       358       103        60
OIR    2025130    131400   -9.2100 -138.4400      28.0       358       103        60
OIR    2025130    131400   -9.2100 -138.4500      28.0       358       103        60
OIR    2025130    131400   -9.2100 -138.4600      28.0       357       103        60
OIR    2025130    131400   -9.2100 -138.4700      28.0       357       103        60
OIR    2025130    131400   -9.2100 -138.4800      27.9       357       103        60
OIR    2025130    131400   -9.2100 -138.4900      27.9       357       103        60
OIR    2025130    131400   -9.2100 -138.5000      27.8       357       103        60
OIR    2025130    131400   -9.2100 -138.5100      27.7       357       103        60
OIR    2025130    131400   -9.2100 -138.5200      27.6       357       103        60
OIR    2025130    131400   -9.2100 -138.5300      27.5       357       103        60
OIR    2025130    131400   -9.2100 -138.5400      27.4       357       103        60
OIR    2025130    131400   -9.2100 -138.5500      27.3       357       103        60
OIR    2025130    131400   -9.2100 -138.5600      27.3       357       103        60
OIR    2025130    131400   -9.2100 -138.5700      27.3       356       103        60
OIR    2025130    131400   -9.2100 -138.5800      27.2       356       103        60
OIR    2025130    131400   -9.2100 -138.5900      27.2       356       103        60
OIR    2025130    131400   -9.2100 -138.6000      27.1       356       103        60
OIR    2025130    131400   -9.2100 -138.6100      27.0       355       103        60
OIR    2025130    131400   -9.2100 -138.6200      26.8       354       103        60
OIR    2025130    131400   -9.2100 -138.6300      26.6       354       103        60
OIR    2025130    131400   -9.2100 -138.6400      26.4       353       103        60
OIR    2025130    131400   -9.2100 -138.6500      26.2       353       103        60
OIR    2025130    131400   -9.2100 -138.6600      26.0       352       103        60
OIR    2025130    131400   -9.2100 -138.6700      25.7       352       103        60
OIR    2025130    131400   -9.2100 -138.6800      25.1       350       103        60
OIR    2025130    131400   -9.2100 -138.6900      24.3       348       103        60
OIR    2025130    131400   -9.2100 -138.7000      23.6       345       103        60
OIR    2025130    131400   -9.2100 -138.7100      23.0       343       103        60
OIR    2025130    131400   -9.2100 -138.7200      22.5       342       103        60
OIR    2025130    131400   -9.2100 -138.7300      22.1       340       104        60
OIR    2025130    131400   -9.2100 -138.7400      21.7       338       105        60
OIR    2025130    131400   -9.2100 -138.7500      21.4       337       107        60
OIR    2025130    131400   -9.2100 -138.7600      21.2       337       108        60
OIR    2025130    131400   -9.2100 -138.7700      20.9       335       108        60
OIR    2025130    131400   -9.2100 -138.7800      20.5       334       109        60
OIR    2025130    131400   -9.2100 -138.7900      19.8       331       111        60
OIR    2025130    131400   -9.2100 -138.8000      18.7       328       114        60
OIR    2025130    131400   -9.2100 -138.8100      18.1       325       116        60
OIR    2025130    131400   -9.2100 -138.8200      17.8       323       117        60
OIR    2025130    131400   -9.2100 -138.8300      17.7       321       117        60
OIR    2025130    131400   -9.2100 -138.8400      17.6       319       116        60
OIR    2025130    131400   -9.2100 -138.8500      17.6       318       115        60
OIR    2025130    131400   -9.2100 -138.8600      17.5       317       117        60
OIR    2025130    131400   -9.2100 -138.8700      17.1       316       120        60
OIR    2025130    131400   -9.2100 -138.8800      16.5       314       120        60
OIR    2025130    131400   -9.2100 -138.8900      16.1       313       122        60
OIR    2025130    131400   -9.2100 -138.9000      16.0       312       124        60
OIR    2025130    131400   -9.2100 -138.9100      16.0       311       127        60
OIR    2025130    131400   -9.2100 -138.9200      15.9       310       132        60
OIR    2025130    131400   -9.2100 -138.9300      15.7       310       135        60
OIR    2025130    131400   -9.2100 -138.9400      15.5       309       137        60
OIR    2025130    131400   -9.2100 -138.9500      15.2       309       139        60
OIR    2025130    131400   -9.2100 -138.9600      13.9       311       141        60
OIR    2025130    131400   -9.2100 -138.9700      13.2       312       139        60
OIR    2025130    131400   -9.2100 -138.9800      12.4       313       138        60
OIR    2025130    131400   -9.2100 -138.9900      11.7       315       138        60
OIR    2025130    131400   -9.2100 -139.0000      11.2       318       143        60
OIR    2025130    131400   -9.2200 -136.5000      36.6        94       142        60
OIR    2025130    131400   -9.2200 -136.5100      35.8        94       138        60
OIR    2025130    131400   -9.2200 -136.5200      34.9        94       134        60
OIR    2025130    131400   -9.2200 -136.5300      34.1        94       131        60
OIR    2025130    131400   -9.2200 -136.5400      33.3        93       129        60
OIR    2025130    131400   -9.2200 -136.5500      32.8        93       128        60
OIR    2025130    131400   -9.2200 -136.5600      32.5        93       127        60
OIR    2025130    131400   -9.2200 -136.5700      32.1        93       126        60
OIR    2025130    131400   -9.2200 -136.5800      31.7        93       126        60
OIR    2025130    131400   -9.2200 -136.5900      31.2        93       125        60
OIR    2025130    131400   -9.2200 -136.6000      30.4        93       125        60
OIR    2025130    131400   -9.2200 -136.6100      29.4        92       125        60
OIR    2025130    131400   -9.2200 -136.6200      28.1        90       125        60
OIR    2025130    131400   -9.2200 -136.6300      27.4        88       126        60
OIR    2025130    131400   -9.2200 -136.6400      27.0        86       126        60
OIR    2025130    131400   -9.2200 -136.6500      26.8        86       124        60
OIR    2025130    131400   -9.2200 -136.6600      26.5        84       123        60
OIR    2025130    131400   -9.2200 -136.6700      26.2        83       122        60
OIR    2025130    131400   -9.2200 -136.6800      26.1        82       121        60
OIR    2025130    131400   -9.2200 -136.6900      26.2        81       117        60
OIR    2025130    131400   -9.2200 -136.7000      26.3        80       117        60
OIR    2025130    131400   -9.2200 -136.7100      26.3        80       116        60
OIR    2025130    131400   -9.2200 -136.7200      26.4        79       116        60
OIR    2025130    131400   -9.2200 -136.7300      26.5        79       116        60
OIR    2025130    131400   -9.2200 -136.7400      26.5        79       116        60
OIR    2025130    131400   -9.2200 -136.7500      26.4        78       116        60
OIR    2025130    131400   -9.2200 -136.7600      26.3        77       116        60
OIR    2025130    131400   -9.2200 -136.7700      26.1        77       116        60
OIR    2025130    131400   -9.2200 -136.7800      25.7        76       116        60
OIR    2025130    131400   -9.2200 -136.7900      25.5        75       116        60
OIR    2025130    131400   -9.2200 -136.8000      25.3        75       120        60
OIR    2025130    131400   -9.2200 -136.8100      25.2        75       122        60
OIR    2025130    131400   -9.2200 -136.8200      25.1        75       122        60
OIR    2025130    131400   -9.2200 -136.8300      25.0        75       121        60
OIR    2025130    131400   -9.2200 -136.8400      25.0        75       119        60
OIR    2025130    131400   -9.2200 -136.8500      25.0        75       122        60
OIR    2025130    131400   -9.2200 -136.8600      25.1        75       123        60
OIR    2025130    131400   -9.2200 -136.8700      25.1        76       123        60
OIR    2025130    131400   -9.2200 -136.8800      25.2        76       123        60
OIR    2025130    131400   -9.2200 -136.8900      25.2        76       121        60
OIR    2025130    131400   -9.2200 -136.9000      25.2        76       120        60
OIR    2025130    131400   -9.2200 -136.9100      25.3        76       117        60
OIR    2025130    131400   -9.2200 -136.9200      25.3        76       115        60
OIR    2025130    131400   -9.2200 -136.9300      25.3        76       113        60
OIR    2025130    131400   -9.2200 -136.9400      25.3        76       114        60
OIR    2025130    131400   -9.2200 -136.9500      25.3        76       114        60
OIR    2025130    131400   -9.2200 -136.9600      25.3        76       114        60
OIR    2025130    131400   -9.2200 -136.9700      25.3        76       113        60
OIR    2025130    131400   -9.2200 -136.9800      25.3        76       112        60
OIR    2025130    131400   -9.2200 -136.9900      25.2        76       111        60
OIR    2025130    131400   -9.2200 -137.0000      25.2        76       109        60
OIR    2025130    131400   -9.2200 -137.0100      25.1        76       109        60
OIR    2025130    131400   -9.2200 -137.0200      25.0        75       108        60
OIR    2025130    131400   -9.2200 -137.0300      24.9        75       108        60
OIR    2025130    131400   -9.2200 -137.0400      24.8        75       108        60
OIR    2025130    131400   -9.2200 -137.0500      24.7        75       109        60
OIR    2025130    131400   -9.2200 -137.0600      24.5        75       109        60
OIR    2025130    131400   -9.2200 -137.0700      24.3        75       112        60
OIR    2025130    131400   -9.2200 -137.0800      24.2        75       113        60
OIR    2025130    131400   -9.2200 -137.0900      24.2        75       113        60
OIR    2025130    131400   -9.2200 -137.1000      24.3        75       113        60
OIR    2025130    131400   -9.2200 -137.1100      24.1        76       113        60
OIR    2025130    131400   -9.2200 -137.1200      23.9        76       115        60
OIR    2025130    131400   -9.2200 -137.1300      23.8        75       117        60
OIR    2025130    131400   -9.2200 -137.1400      24.1        75       115        60
OIR    2025130    131400   -9.2200 -137.1500      24.3        75       113        60
OIR    2025130    131400   -9.2200 -137.1600      24.3        75       110        60
OIR    2025130    131400   -9.2200 -137.1700      23.8        75       108        60
OIR    2025130    131400   -9.2200 -137.1800      23.4        74       107        60
OIR    2025130    131400   -9.2200 -137.1900      23.8        73       107        60
OIR    2025130    131400   -9.2200 -137.2000      24.0        72       108        60
OIR    2025130    131400   -9.2200 -137.2100      23.8        73       109        60
OIR    2025130    131400   -9.2200 -137.2200      23.3        74       111        60
OIR    2025130    131400   -9.2200 -137.2300      22.9        74       112        60
OIR    2025130    131400   -9.2200 -137.2400      22.5        73       113        60
OIR    2025130    131400   -9.2200 -137.2500      22.1        72       111        60
OIR    2025130    131400   -9.2200 -137.2600      21.4        71       109        60
OIR    2025130    131400   -9.2200 -137.2700      20.1        69       108        60
OIR    2025130    131400   -9.2200 -137.2800      19.7        66       107        60
OIR    2025130    131400   -9.2200 -137.2900      19.6        64       105        60
OIR    2025130    131400   -9.2200 -137.3000      19.5        64       104        60
OIR    2025130    131400   -9.2200 -137.3100      19.3        63       103        60
OIR    2025130    131400   -9.2200 -137.3200      19.1        63       103        60
OIR    2025130    131400   -9.2200 -137.3300      18.9        62       103        60
OIR    2025130    131400   -9.2200 -137.3400      18.8        62       103        60
OIR    2025130    131400   -9.2200 -137.3500      18.7        62       103        60
OIR    2025130    131400   -9.2200 -137.3600      18.6        62       103        60
OIR    2025130    131400   -9.2200 -137.3700      18.5        62       103        60
OIR    2025130    131400   -9.2200 -137.3800      18.5        62       103        60
OIR    2025130    131400   -9.2200 -137.3900      18.5        62       103        60
OIR    2025130    131400   -9.2200 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2200 -137.4100      18.5        62       103        60
OIR    2025130    131400   -9.2200 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.2200 -137.4300      18.4        62       103        60
OIR    2025130    131400   -9.2200 -137.4400      18.0        60       103        60
OIR    2025130    131400   -9.2200 -137.4500      15.8        53       103        60
OIR    2025130    131400   -9.2200 -137.4600      13.2        44       103        60
OIR    2025130    131400   -9.2200 -137.4700      11.7        41       103        60
OIR    2025130    131400   -9.2200 -137.4800      11.3        41       103        60
OIR    2025130    131400   -9.2200 -137.4900      11.2        40       104        60
OIR    2025130    131400   -9.2200 -137.5000      11.3        40       105        60
OIR    2025130    131400   -9.2200 -137.5100      11.7        38       114        60
OIR    2025130    131400   -9.2200 -137.5200      11.9        29       121        60
OIR    2025130    131400   -9.2200 -137.5300      13.5        22       126        60
OIR    2025130    131400   -9.2200 -137.5400      15.2        19       129        60
OIR    2025130    131400   -9.2200 -137.5500      15.5        17       133        60
OIR    2025130    131400   -9.2200 -137.5600      14.7        16       131        60
OIR    2025130    131400   -9.2200 -137.5700      12.9         7       127        60
OIR    2025130    131400   -9.2200 -137.5800      11.5         2       125        60
OIR    2025130    131400   -9.2200 -137.5900      10.9         2       124        60
OIR    2025130    131400   -9.2200 -137.6000      11.3         1       125        60
OIR    2025130    131400   -9.2200 -137.6100      12.4       358       127        60
OIR    2025130    131400   -9.2200 -137.6200      14.4       355       135        60
OIR    2025130    131400   -9.2200 -137.6300      16.6       355       139        60
OIR    2025130    131400   -9.2200 -137.6400      17.7       355       139        60
OIR    2025130    131400   -9.2200 -137.6500      17.9       354       137        60
OIR    2025130    131400   -9.2200 -137.6600      17.7       353       134        60
OIR    2025130    131400   -9.2200 -137.6700      17.3       351       134        60
OIR    2025130    131400   -9.2200 -137.6800      16.5       349       134        60
OIR    2025130    131400   -9.2200 -137.6900      15.6       347       135        60
OIR    2025130    131400   -9.2200 -137.7000      14.6       346       135        60
OIR    2025130    131400   -9.2200 -137.7100      13.9       344       133        60
OIR    2025130    131400   -9.2200 -137.7200      13.4       342       132        60
OIR    2025130    131400   -9.2200 -137.7300      12.8       342       129        60
OIR    2025130    131400   -9.2200 -137.7400      12.4       342       128        60
OIR    2025130    131400   -9.2200 -137.7500      11.6       342       127        60
OIR    2025130    131400   -9.2200 -137.7600      10.1       339       127        60
OIR    2025130    131400   -9.2200 -137.7700       8.5       332       127        60
OIR    2025130    131400   -9.2200 -137.7800       6.7       315       127        60
OIR    2025130    131400   -9.2200 -137.7900       5.7       297       127        60
OIR    2025130    131400   -9.2200 -137.8000       5.6       287       128        60
OIR    2025130    131400   -9.2200 -137.8100       5.5       285       128        60
OIR    2025130    131400   -9.2200 -137.8200       5.5       284       128        60
OIR    2025130    131400   -9.2200 -137.8300       5.4       282       128        60
OIR    2025130    131400   -9.2200 -137.8400       5.3       280       128        60
OIR    2025130    131400   -9.2200 -137.8500       5.3       278       129        60
OIR    2025130    131400   -9.2200 -137.8600       5.3       275       131        60
OIR    2025130    131400   -9.2200 -137.8700       5.4       273       129        60
OIR    2025130    131400   -9.2200 -137.8800       5.4       272       128        60
OIR    2025130    131400   -9.2200 -137.8900       5.5       272       127        60
OIR    2025130    131400   -9.2200 -137.9000       5.5       271       126        60
OIR    2025130    131400   -9.2200 -137.9100       5.6       270       125        60
OIR    2025130    131400   -9.2200 -137.9200       5.7       270       126        60
OIR    2025130    131400   -9.2200 -137.9300       5.7       270       129        60
OIR    2025130    131400   -9.2200 -137.9400       5.8       270       132        60
OIR    2025130    131400   -9.2200 -137.9500       6.1       269       135        60
OIR    2025130    131400   -9.2200 -137.9600       6.5       268       137        60
OIR    2025130    131400   -9.2200 -137.9700       7.4       269       139        60
OIR    2025130    131400   -9.2200 -137.9800       8.2       270       141        60
OIR    2025130    131400   -9.2200 -137.9900       9.3       270       143        60
OIR    2025130    131400   -9.2200 -138.2500      19.0        33       142        60
OIR    2025130    131400   -9.2200 -138.2600      20.3        32       109        60
OIR    2025130    131400   -9.2200 -138.2700      22.7        16       103        60
OIR    2025130    131400   -9.2200 -138.2800      23.7        15       103        60
OIR    2025130    131400   -9.2200 -138.2900      24.7        14       103        60
OIR    2025130    131400   -9.2200 -138.3000      25.4        12       103        60
OIR    2025130    131400   -9.2200 -138.3100      25.9        11       103        60
OIR    2025130    131400   -9.2200 -138.3200      26.3         9       103        60
OIR    2025130    131400   -9.2200 -138.3300      26.7         7       103        60
OIR    2025130    131400   -9.2200 -138.3400      27.0         5       103        60
OIR    2025130    131400   -9.2200 -138.3500      27.4         2       103        60
OIR    2025130    131400   -9.2200 -138.3600      27.6         1       103        60
OIR    2025130    131400   -9.2200 -138.3700      27.8         0       103        60
OIR    2025130    131400   -9.2200 -138.3800      27.9       360       103        60
OIR    2025130    131400   -9.2200 -138.3900      28.0       359       103        60
OIR    2025130    131400   -9.2200 -138.4000      28.1       359       103        60
OIR    2025130    131400   -9.2200 -138.4100      28.2       358       103        60
OIR    2025130    131400   -9.2200 -138.4200      28.2       358       103        60
OIR    2025130    131400   -9.2200 -138.4300      28.3       358       103        60
OIR    2025130    131400   -9.2200 -138.4400      28.2       358       103        60
OIR    2025130    131400   -9.2200 -138.4500      28.2       358       103        60
OIR    2025130    131400   -9.2200 -138.4600      28.1       357       103        60
OIR    2025130    131400   -9.2200 -138.4700      28.1       357       103        60
OIR    2025130    131400   -9.2200 -138.4800      28.0       357       103        60
OIR    2025130    131400   -9.2200 -138.4900      28.0       357       103        60
OIR    2025130    131400   -9.2200 -138.5000      27.9       357       103        60
OIR    2025130    131400   -9.2200 -138.5100      27.8       357       103        60
OIR    2025130    131400   -9.2200 -138.5200      27.7       357       103        60
OIR    2025130    131400   -9.2200 -138.5300      27.6       357       103        60
OIR    2025130    131400   -9.2200 -138.5400      27.5       357       103        60
OIR    2025130    131400   -9.2200 -138.5500      27.4       357       103        60
OIR    2025130    131400   -9.2200 -138.5600      27.4       356       103        60
OIR    2025130    131400   -9.2200 -138.5700      27.3       356       103        60
OIR    2025130    131400   -9.2200 -138.5800      27.3       356       103        60
OIR    2025130    131400   -9.2200 -138.5900      27.2       356       103        60
OIR    2025130    131400   -9.2200 -138.6000      27.2       355       103        60
OIR    2025130    131400   -9.2200 -138.6100      27.0       354       103        60
OIR    2025130    131400   -9.2200 -138.6200      26.9       354       103        60
OIR    2025130    131400   -9.2200 -138.6300      26.7       353       103        60
OIR    2025130    131400   -9.2200 -138.6400      26.6       353       103        60
OIR    2025130    131400   -9.2200 -138.6500      26.4       352       103        60
OIR    2025130    131400   -9.2200 -138.6600      26.2       352       103        60
OIR    2025130    131400   -9.2200 -138.6700      25.9       351       103        60
OIR    2025130    131400   -9.2200 -138.6800      25.4       350       104        60
OIR    2025130    131400   -9.2200 -138.6900      24.5       347       104        60
OIR    2025130    131400   -9.2200 -138.7000      23.7       345       103        60
OIR    2025130    131400   -9.2200 -138.7100      23.1       343       103        60
OIR    2025130    131400   -9.2200 -138.7200      22.8       341       103        60
OIR    2025130    131400   -9.2200 -138.7300      22.3       339       104        60
OIR    2025130    131400   -9.2200 -138.7400      21.9       338       104        60
OIR    2025130    131400   -9.2200 -138.7500      21.6       337       108        60
OIR    2025130    131400   -9.2200 -138.7600      21.3       336       110        60
OIR    2025130    131400   -9.2200 -138.7700      21.2       334       108        60
OIR    2025130    131400   -9.2200 -138.7800      21.0       333       108        60
OIR    2025130    131400   -9.2200 -138.7900      20.7       331       109        60
OIR    2025130    131400   -9.2200 -138.8000      20.1       328       112        60
OIR    2025130    131400   -9.2200 -138.8100      19.2       325       115        60
OIR    2025130    131400   -9.2200 -138.8200      18.5       323       116        60
OIR    2025130    131400   -9.2200 -138.8300      18.3       321       117        60
OIR    2025130    131400   -9.2200 -138.8400      18.3       320       116        60
OIR    2025130    131400   -9.2200 -138.8500      18.3       319       115        60
OIR    2025130    131400   -9.2200 -138.8600      18.5       318       116        60
OIR    2025130    131400   -9.2200 -138.8700      19.9       320       119        60
OIR    2025130    131400   -9.2200 -138.8800      21.7       322       120        60
OIR    2025130    131400   -9.2200 -138.8900      22.4       323       121        60
OIR    2025130    131400   -9.2200 -138.9000      22.1       323       123        60
OIR    2025130    131400   -9.2200 -138.9100      20.6       321       125        60
OIR    2025130    131400   -9.2200 -138.9200      18.9       316       130        60
OIR    2025130    131400   -9.2200 -138.9300      17.0       311       133        60
OIR    2025130    131400   -9.2200 -138.9400      16.2       310       136        60
OIR    2025130    131400   -9.2200 -138.9500      15.3       310       140        60
OIR    2025130    131400   -9.2200 -138.9600      14.4       312       142        60
OIR    2025130    131400   -9.2200 -138.9700      13.5       313       140        60
OIR    2025130    131400   -9.2200 -138.9800      12.7       313       139        60
OIR    2025130    131400   -9.2200 -138.9900      12.0       315       139        60
OIR    2025130    131400   -9.2200 -139.0000      11.3       318       143        60
OIR    2025130    131400   -9.2300 -136.5000      36.0        93       139        60
OIR    2025130    131400   -9.2300 -136.5100      35.3        93       135        60
OIR    2025130    131400   -9.2300 -136.5200      34.6        93       132        60
OIR    2025130    131400   -9.2300 -136.5300      33.9        92       130        60
OIR    2025130    131400   -9.2300 -136.5400      33.2        92       129        60
OIR    2025130    131400   -9.2300 -136.5500      32.8        92       127        60
OIR    2025130    131400   -9.2300 -136.5600      32.4        92       126        60
OIR    2025130    131400   -9.2300 -136.5700      32.0        92       124        60
OIR    2025130    131400   -9.2300 -136.5800      31.5        92       123        60
OIR    2025130    131400   -9.2300 -136.5900      30.9        92       123        60
OIR    2025130    131400   -9.2300 -136.6000      30.1        91       123        60
OIR    2025130    131400   -9.2300 -136.6100      29.0        90       124        60
OIR    2025130    131400   -9.2300 -136.6200      27.8        88       124        60
OIR    2025130    131400   -9.2300 -136.6300      27.1        86       127        60
OIR    2025130    131400   -9.2300 -136.6400      26.8        85       127        60
OIR    2025130    131400   -9.2300 -136.6500      26.6        83       125        60
OIR    2025130    131400   -9.2300 -136.6600      26.4        82       123        60
OIR    2025130    131400   -9.2300 -136.6700      26.2        81       122        60
OIR    2025130    131400   -9.2300 -136.6800      26.1        81       120        60
OIR    2025130    131400   -9.2300 -136.6900      26.1        81       116        60
OIR    2025130    131400   -9.2300 -136.7000      26.2        80       116        60
OIR    2025130    131400   -9.2300 -136.7100      26.2        80       116        60
OIR    2025130    131400   -9.2300 -136.7200      26.3        79       116        60
OIR    2025130    131400   -9.2300 -136.7300      26.4        79       116        60
OIR    2025130    131400   -9.2300 -136.7400      26.4        78       115        60
OIR    2025130    131400   -9.2300 -136.7500      26.3        78       116        60
OIR    2025130    131400   -9.2300 -136.7600      26.2        77       117        60
OIR    2025130    131400   -9.2300 -136.7700      26.0        76       116        60
OIR    2025130    131400   -9.2300 -136.7800      25.7        75       116        60
OIR    2025130    131400   -9.2300 -136.7900      25.6        75       116        60
OIR    2025130    131400   -9.2300 -136.8000      25.4        75       121        60
OIR    2025130    131400   -9.2300 -136.8100      25.2        75       124        60
OIR    2025130    131400   -9.2300 -136.8200      25.1        75       125        60
OIR    2025130    131400   -9.2300 -136.8300      25.1        75       122        60
OIR    2025130    131400   -9.2300 -136.8400      25.0        75       120        60
OIR    2025130    131400   -9.2300 -136.8500      25.1        75       121        60
OIR    2025130    131400   -9.2300 -136.8600      25.1        75       121        60
OIR    2025130    131400   -9.2300 -136.8700      25.2        76       121        60
OIR    2025130    131400   -9.2300 -136.8800      25.2        76       121        60
OIR    2025130    131400   -9.2300 -136.8900      25.2        76       120        60
OIR    2025130    131400   -9.2300 -136.9000      25.3        76       117        60
OIR    2025130    131400   -9.2300 -136.9100      25.3        76       116        60
OIR    2025130    131400   -9.2300 -136.9200      25.3        76       113        60
OIR    2025130    131400   -9.2300 -136.9300      25.3        76       112        60
OIR    2025130    131400   -9.2300 -136.9400      25.3        76       115        60
OIR    2025130    131400   -9.2300 -136.9500      25.3        76       116        60
OIR    2025130    131400   -9.2300 -136.9600      25.3        76       115        60
OIR    2025130    131400   -9.2300 -136.9700      25.3        76       113        60
OIR    2025130    131400   -9.2300 -136.9800      25.3        76       111        60
OIR    2025130    131400   -9.2300 -136.9900      25.3        76       109        60
OIR    2025130    131400   -9.2300 -137.0000      25.2        75       108        60
OIR    2025130    131400   -9.2300 -137.0100      25.2        75       108        60
OIR    2025130    131400   -9.2300 -137.0200      25.1        75       108        60
OIR    2025130    131400   -9.2300 -137.0300      25.1        75       108        60
OIR    2025130    131400   -9.2300 -137.0400      25.0        75       109        60
OIR    2025130    131400   -9.2300 -137.0500      24.9        74       109        60
OIR    2025130    131400   -9.2300 -137.0600      24.8        74       110        60
OIR    2025130    131400   -9.2300 -137.0700      24.5        74       113        60
OIR    2025130    131400   -9.2300 -137.0800      24.5        73       114        60
OIR    2025130    131400   -9.2300 -137.0900      24.7        73       113        60
OIR    2025130    131400   -9.2300 -137.1000      25.3        71       114        60
OIR    2025130    131400   -9.2300 -137.1100      26.0        69       114        60
OIR    2025130    131400   -9.2300 -137.1200      26.5        68       116        60
OIR    2025130    131400   -9.2300 -137.1300      26.5        69       121        60
OIR    2025130    131400   -9.2300 -137.1400      26.3        70       116        60
OIR    2025130    131400   -9.2300 -137.1500      26.5        70       114        60
OIR    2025130    131400   -9.2300 -137.1600      26.7        70       110        60
OIR    2025130    131400   -9.2300 -137.1700      26.9        69       107        60
OIR    2025130    131400   -9.2300 -137.1800      26.7        69       105        60
OIR    2025130    131400   -9.2300 -137.1900      25.4        69       105        60
OIR    2025130    131400   -9.2300 -137.2000      25.1        70       107        60
OIR    2025130    131400   -9.2300 -137.2100      24.8        71       109        60
OIR    2025130    131400   -9.2300 -137.2200      24.2        72       110        60
OIR    2025130    131400   -9.2300 -137.2300      23.7        72       111        60
OIR    2025130    131400   -9.2300 -137.2400      23.4        72       111        60
OIR    2025130    131400   -9.2300 -137.2500      23.1        71       109        60
OIR    2025130    131400   -9.2300 -137.2600      22.8        69       108        60
OIR    2025130    131400   -9.2300 -137.2700      21.9        68       107        60
OIR    2025130    131400   -9.2300 -137.2800      21.2        66       107        60
OIR    2025130    131400   -9.2300 -137.2900      20.6        64       107        60
OIR    2025130    131400   -9.2300 -137.3000      20.1        63       105        60
OIR    2025130    131400   -9.2300 -137.3100      19.7        63       103        60
OIR    2025130    131400   -9.2300 -137.3200      19.3        62       103        60
OIR    2025130    131400   -9.2300 -137.3300      19.0        62       103        60
OIR    2025130    131400   -9.2300 -137.3400      18.9        62       103        60
OIR    2025130    131400   -9.2300 -137.3500      18.7        62       103        60
OIR    2025130    131400   -9.2300 -137.3600      18.7        62       103        60
OIR    2025130    131400   -9.2300 -137.3700      18.6        62       103        60
OIR    2025130    131400   -9.2300 -137.3800      18.5        62       103        60
OIR    2025130    131400   -9.2300 -137.3900      18.5        62       103        60
OIR    2025130    131400   -9.2300 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2300 -137.4100      18.5        62       103        60
OIR    2025130    131400   -9.2300 -137.4200      18.4        62       103        60
OIR    2025130    131400   -9.2300 -137.4300      18.2        61       103        60
OIR    2025130    131400   -9.2300 -137.4400      17.5        59       103        60
OIR    2025130    131400   -9.2300 -137.4500      14.3        49       103        60
OIR    2025130    131400   -9.2300 -137.4600      11.9        39       103        60
OIR    2025130    131400   -9.2300 -137.4700      10.8        36       103        60
OIR    2025130    131400   -9.2300 -137.4800      10.3        36       104        60
OIR    2025130    131400   -9.2300 -137.4900      10.0        37       104        60
OIR    2025130    131400   -9.2300 -137.5000      10.0        37       108        60
OIR    2025130    131400   -9.2300 -137.5100      10.0        31       116        60
OIR    2025130    131400   -9.2300 -137.5200      10.2        21       122        60
OIR    2025130    131400   -9.2300 -137.5300      10.4        11       124        60
OIR    2025130    131400   -9.2300 -137.5400      10.2         3       128        60
OIR    2025130    131400   -9.2300 -137.5500       9.7       356       132        60
OIR    2025130    131400   -9.2300 -137.5600       9.4       352       132        60
OIR    2025130    131400   -9.2300 -137.5700       9.4       351       131        60
OIR    2025130    131400   -9.2300 -137.5800       9.6       352       129        60
OIR    2025130    131400   -9.2300 -137.5900       9.7       353       129        60
OIR    2025130    131400   -9.2300 -137.6000       9.9       354       130        60
OIR    2025130    131400   -9.2300 -137.6100      10.4       356       132        60
OIR    2025130    131400   -9.2300 -137.6200      12.0       357       138        60
OIR    2025130    131400   -9.2300 -137.6300      13.5       354       139        60
OIR    2025130    131400   -9.2300 -137.6400      15.5       355       137        60
OIR    2025130    131400   -9.2300 -137.6500      16.3       354       135        60
OIR    2025130    131400   -9.2300 -137.6600      15.9       353       133        60
OIR    2025130    131400   -9.2300 -137.6700      15.4       351       133        60
OIR    2025130    131400   -9.2300 -137.6800      14.3       349       133        60
OIR    2025130    131400   -9.2300 -137.6900      12.8       346       132        60
OIR    2025130    131400   -9.2300 -137.7000      11.7       343       132        60
OIR    2025130    131400   -9.2300 -137.7100      10.8       339       131        60
OIR    2025130    131400   -9.2300 -137.7200      10.0       335       130        60
OIR    2025130    131400   -9.2300 -137.7300       8.9       330       128        60
OIR    2025130    131400   -9.2300 -137.7400       8.3       327       127        60
OIR    2025130    131400   -9.2300 -137.7500       7.8       325       127        60
OIR    2025130    131400   -9.2300 -137.7600       7.4       322       126        60
OIR    2025130    131400   -9.2300 -137.7700       6.7       314       126        60
OIR    2025130    131400   -9.2300 -137.7800       5.9       299       126        60
OIR    2025130    131400   -9.2300 -137.7900       5.7       289       126        60
OIR    2025130    131400   -9.2300 -137.8000       5.7       286       127        60
OIR    2025130    131400   -9.2300 -137.8100       5.6       284       127        60
OIR    2025130    131400   -9.2300 -137.8200       5.6       284       127        60
OIR    2025130    131400   -9.2300 -137.8300       5.5       283       128        60
OIR    2025130    131400   -9.2300 -137.8400       5.5       282       128        60
OIR    2025130    131400   -9.2300 -137.8500       5.5       280       129        60
OIR    2025130    131400   -9.2300 -137.8600       5.4       278       131        60
OIR    2025130    131400   -9.2300 -137.8700       5.5       274       130        60
OIR    2025130    131400   -9.2300 -137.8800       5.6       273       129        60
OIR    2025130    131400   -9.2300 -137.8900       5.6       272       128        60
OIR    2025130    131400   -9.2300 -137.9000       5.6       272       126        60
OIR    2025130    131400   -9.2300 -137.9100       5.7       271       124        60
OIR    2025130    131400   -9.2300 -137.9200       5.7       271       125        60
OIR    2025130    131400   -9.2300 -137.9300       5.8       271       130        60
OIR    2025130    131400   -9.2300 -137.9400       5.8       270       132        60
OIR    2025130    131400   -9.2300 -137.9500       5.9       270       134        60
OIR    2025130    131400   -9.2300 -137.9600       6.4       269       136        60
OIR    2025130    131400   -9.2300 -137.9700       7.4       271       138        60
OIR    2025130    131400   -9.2300 -137.9800       7.9       272       139        60
OIR    2025130    131400   -9.2300 -137.9900       8.3       272       142        60
OIR    2025130    131400   -9.2300 -138.0000       8.8       272       146        60
OIR    2025130    131400   -9.2300 -138.2500      17.3        57       134        60
OIR    2025130    131400   -9.2300 -138.2600      19.7        34       107        60
OIR    2025130    131400   -9.2300 -138.2700      23.8        16       103        60
OIR    2025130    131400   -9.2300 -138.2800      24.9        17       103        60
OIR    2025130    131400   -9.2300 -138.2900      25.8        16       103        60
OIR    2025130    131400   -9.2300 -138.3000      26.2        14       103        60
OIR    2025130    131400   -9.2300 -138.3100      26.5        12       103        60
OIR    2025130    131400   -9.2300 -138.3200      26.8        11       103        60
OIR    2025130    131400   -9.2300 -138.3300      27.1         9       103        60
OIR    2025130    131400   -9.2300 -138.3400      27.3         7       103        60
OIR    2025130    131400   -9.2300 -138.3500      27.6         3       103        60
OIR    2025130    131400   -9.2300 -138.3600      27.8         2       103        60
OIR    2025130    131400   -9.2300 -138.3700      28.0         1       103        60
OIR    2025130    131400   -9.2300 -138.3800      28.1         0       103        60
OIR    2025130    131400   -9.2300 -138.3900      28.2       359       103        60
OIR    2025130    131400   -9.2300 -138.4000      28.3       359       103        60
OIR    2025130    131400   -9.2300 -138.4100      28.4       359       103        60
OIR    2025130    131400   -9.2300 -138.4200      28.5       358       103        60
OIR    2025130    131400   -9.2300 -138.4300      28.5       358       103        60
OIR    2025130    131400   -9.2300 -138.4400      28.5       358       103        60
OIR    2025130    131400   -9.2300 -138.4500      28.4       358       103        60
OIR    2025130    131400   -9.2300 -138.4600      28.3       357       103        60
OIR    2025130    131400   -9.2300 -138.4700      28.2       357       103        60
OIR    2025130    131400   -9.2300 -138.4800      28.1       357       103        60
OIR    2025130    131400   -9.2300 -138.4900      28.0       357       103        60
OIR    2025130    131400   -9.2300 -138.5000      28.0       357       103        60
OIR    2025130    131400   -9.2300 -138.5100      27.9       357       103        60
OIR    2025130    131400   -9.2300 -138.5200      27.8       357       103        60
OIR    2025130    131400   -9.2300 -138.5300      27.7       357       103        60
OIR    2025130    131400   -9.2300 -138.5400      27.6       357       103        60
OIR    2025130    131400   -9.2300 -138.5500      27.5       357       103        60
OIR    2025130    131400   -9.2300 -138.5600      27.5       356       103        60
OIR    2025130    131400   -9.2300 -138.5700      27.4       356       103        60
OIR    2025130    131400   -9.2300 -138.5800      27.4       356       103        60
OIR    2025130    131400   -9.2300 -138.5900      27.3       355       103        60
OIR    2025130    131400   -9.2300 -138.6000      27.2       355       103        60
OIR    2025130    131400   -9.2300 -138.6100      27.1       354       103        60
OIR    2025130    131400   -9.2300 -138.6200      27.0       354       103        60
OIR    2025130    131400   -9.2300 -138.6300      26.9       353       103        60
OIR    2025130    131400   -9.2300 -138.6400      26.7       353       103        60
OIR    2025130    131400   -9.2300 -138.6500      26.5       352       103        60
OIR    2025130    131400   -9.2300 -138.6600      26.3       352       103        60
OIR    2025130    131400   -9.2300 -138.6700      26.1       351       103        60
OIR    2025130    131400   -9.2300 -138.6800      25.6       349       104        60
OIR    2025130    131400   -9.2300 -138.6900      24.9       347       104        60
OIR    2025130    131400   -9.2300 -138.7000      24.0       344       103        60
OIR    2025130    131400   -9.2300 -138.7100      23.5       342       103        60
OIR    2025130    131400   -9.2300 -138.7200      23.0       340       103        60
OIR    2025130    131400   -9.2300 -138.7300      22.5       339       103        60
OIR    2025130    131400   -9.2300 -138.7400      22.1       338       104        60
OIR    2025130    131400   -9.2300 -138.7500      21.8       337       108        60
OIR    2025130    131400   -9.2300 -138.7600      21.5       335       110        60
OIR    2025130    131400   -9.2300 -138.7700      21.3       333       108        60
OIR    2025130    131400   -9.2300 -138.7800      21.3       331       108        60
OIR    2025130    131400   -9.2300 -138.7900      21.2       329       108        60
OIR    2025130    131400   -9.2300 -138.8000      20.9       327       111        60
OIR    2025130    131400   -9.2300 -138.8100      20.3       325       115        60
OIR    2025130    131400   -9.2300 -138.8200      19.3       323       116        60
OIR    2025130    131400   -9.2300 -138.8300      18.9       321       117        60
OIR    2025130    131400   -9.2300 -138.8400      19.2       320       116        60
OIR    2025130    131400   -9.2300 -138.8500      19.7       320       116        60
OIR    2025130    131400   -9.2300 -138.8600      20.5       320       117        60
OIR    2025130    131400   -9.2300 -138.8700      21.7       322       119        60
OIR    2025130    131400   -9.2300 -138.8800      22.5       323       120        60
OIR    2025130    131400   -9.2300 -138.8900      22.5       323       123        60
OIR    2025130    131400   -9.2300 -138.9000      22.5       323       125        60
OIR    2025130    131400   -9.2300 -138.9100      22.2       323       127        60
OIR    2025130    131400   -9.2300 -138.9200      21.7       321       130        60
OIR    2025130    131400   -9.2300 -138.9300      20.4       319       133        60
OIR    2025130    131400   -9.2300 -138.9400      17.9       316       136        60
OIR    2025130    131400   -9.2300 -138.9500      15.7       313       140        60
OIR    2025130    131400   -9.2300 -138.9600      14.8       313       143        60
OIR    2025130    131400   -9.2300 -138.9700      13.9       313       142        60
OIR    2025130    131400   -9.2300 -138.9800      13.1       313       140        60
OIR    2025130    131400   -9.2300 -138.9900      12.3       315       138        60
OIR    2025130    131400   -9.2300 -139.0000      11.4       318       143        60
OIR    2025130    131400   -9.2400 -136.2200      38.8        94       147        60
OIR    2025130    131400   -9.2400 -136.4700      37.9        93       143        60
OIR    2025130    131400   -9.2400 -136.4800      37.2        93       141        60
OIR    2025130    131400   -9.2400 -136.4900      36.3        92       139        60
OIR    2025130    131400   -9.2400 -136.5000      35.5        92       136        60
OIR    2025130    131400   -9.2400 -136.5100      35.0        92       133        60
OIR    2025130    131400   -9.2400 -136.5200      34.4        92       131        60
OIR    2025130    131400   -9.2400 -136.5300      33.9        92       129        60
OIR    2025130    131400   -9.2400 -136.5400      33.3        92       127        60
OIR    2025130    131400   -9.2400 -136.5500      32.7        92       126        60
OIR    2025130    131400   -9.2400 -136.5600      32.3        92       124        60
OIR    2025130    131400   -9.2400 -136.5700      31.9        91       124        60
OIR    2025130    131400   -9.2400 -136.5800      31.4        91       123        60
OIR    2025130    131400   -9.2400 -136.5900      30.6        91       122        60
OIR    2025130    131400   -9.2400 -136.6000      29.6        90       121        60
OIR    2025130    131400   -9.2400 -136.6100      28.5        88       122        60
OIR    2025130    131400   -9.2400 -136.6200      27.5        86       123        60
OIR    2025130    131400   -9.2400 -136.6300      26.9        84       125        60
OIR    2025130    131400   -9.2400 -136.6400      26.7        83       125        60
OIR    2025130    131400   -9.2400 -136.6500      26.6        82       124        60
OIR    2025130    131400   -9.2400 -136.6600      26.4        81       123        60
OIR    2025130    131400   -9.2400 -136.6700      26.2        81       122        60
OIR    2025130    131400   -9.2400 -136.6800      26.1        80       120        60
OIR    2025130    131400   -9.2400 -136.6900      26.1        80       116        60
OIR    2025130    131400   -9.2400 -136.7000      26.1        79       116        60
OIR    2025130    131400   -9.2400 -136.7100      26.1        79       115        60
OIR    2025130    131400   -9.2400 -136.7200      26.2        78       115        60
OIR    2025130    131400   -9.2400 -136.7300      26.2        78       115        60
OIR    2025130    131400   -9.2400 -136.7400      26.3        77       115        60
OIR    2025130    131400   -9.2400 -136.7500      26.2        77       116        60
OIR    2025130    131400   -9.2400 -136.7600      26.2        76       116        60
OIR    2025130    131400   -9.2400 -136.7700      26.0        76       116        60
OIR    2025130    131400   -9.2400 -136.7800      25.8        75       114        60
OIR    2025130    131400   -9.2400 -136.7900      25.7        75       116        60
OIR    2025130    131400   -9.2400 -136.8000      25.5        75       119        60
OIR    2025130    131400   -9.2400 -136.8100      25.3        75       122        60
OIR    2025130    131400   -9.2400 -136.8200      25.1        75       123        60
OIR    2025130    131400   -9.2400 -136.8300      25.1        75       121        60
OIR    2025130    131400   -9.2400 -136.8400      25.1        75       120        60
OIR    2025130    131400   -9.2400 -136.8500      25.1        75       117        60
OIR    2025130    131400   -9.2400 -136.8600      25.1        75       116        60
OIR    2025130    131400   -9.2400 -136.8700      25.2        75       117        60
OIR    2025130    131400   -9.2400 -136.8800      25.2        76       116        60
OIR    2025130    131400   -9.2400 -136.8900      25.3        76       115        60
OIR    2025130    131400   -9.2400 -136.9000      25.3        76       114        60
OIR    2025130    131400   -9.2400 -136.9100      25.3        76       112        60
OIR    2025130    131400   -9.2400 -136.9200      25.3        76       111        60
OIR    2025130    131400   -9.2400 -136.9300      25.4        76       112        60
OIR    2025130    131400   -9.2400 -136.9400      25.4        76       113        60
OIR    2025130    131400   -9.2400 -136.9500      25.4        76       114        60
OIR    2025130    131400   -9.2400 -136.9600      25.4        76       112        60
OIR    2025130    131400   -9.2400 -136.9700      25.4        76       110        60
OIR    2025130    131400   -9.2400 -136.9800      25.3        76       110        60
OIR    2025130    131400   -9.2400 -136.9900      25.3        75       108        60
OIR    2025130    131400   -9.2400 -137.0000      25.3        75       105        60
OIR    2025130    131400   -9.2400 -137.0100      25.3        75       105        60
OIR    2025130    131400   -9.2400 -137.0200      25.3        75       107        60
OIR    2025130    131400   -9.2400 -137.0300      25.2        74       108        60
OIR    2025130    131400   -9.2400 -137.0400      25.2        74       109        60
OIR    2025130    131400   -9.2400 -137.0500      25.2        73       110        60
OIR    2025130    131400   -9.2400 -137.0600      25.1        72       110        60
OIR    2025130    131400   -9.2400 -137.0700      25.0        71       111        60
OIR    2025130    131400   -9.2400 -137.0800      25.3        70       113        60
OIR    2025130    131400   -9.2400 -137.0900      25.8        67       116        60
OIR    2025130    131400   -9.2400 -137.1000      26.6        65       116        60
OIR    2025130    131400   -9.2400 -137.1100      27.4        65       117        60
OIR    2025130    131400   -9.2400 -137.1200      27.9        65       119        60
OIR    2025130    131400   -9.2400 -137.1300      28.3        65       122        60
OIR    2025130    131400   -9.2400 -137.1400      28.4        66       117        60
OIR    2025130    131400   -9.2400 -137.1500      28.3        67       114        60
OIR    2025130    131400   -9.2400 -137.1600      28.2        67       110        60
OIR    2025130    131400   -9.2400 -137.1700      28.1        67       105        60
OIR    2025130    131400   -9.2400 -137.1800      27.9        67       104        60
OIR    2025130    131400   -9.2400 -137.1900      27.5        67       104        60
OIR    2025130    131400   -9.2400 -137.2000      26.8        68       107        60
OIR    2025130    131400   -9.2400 -137.2100      26.2        69       108        60
OIR    2025130    131400   -9.2400 -137.2200      25.5        70       108        60
OIR    2025130    131400   -9.2400 -137.2300      24.6        71       108        60
OIR    2025130    131400   -9.2400 -137.2400      24.1        71       109        60
OIR    2025130    131400   -9.2400 -137.2500      23.8        70       108        60
OIR    2025130    131400   -9.2400 -137.2600      23.5        68       105        60
OIR    2025130    131400   -9.2400 -137.2700      23.1        67       105        60
OIR    2025130    131400   -9.2400 -137.2800      22.7        65       104        60
OIR    2025130    131400   -9.2400 -137.2900      21.7        63       107        60
OIR    2025130    131400   -9.2400 -137.3000      20.9        63       105        60
OIR    2025130    131400   -9.2400 -137.3100      20.1        62       103        60
OIR    2025130    131400   -9.2400 -137.3200      19.5        62       103        60
OIR    2025130    131400   -9.2400 -137.3300      19.2        61       103        60
OIR    2025130    131400   -9.2400 -137.3400      19.0        61       103        60
OIR    2025130    131400   -9.2400 -137.3500      18.8        61       103        60
OIR    2025130    131400   -9.2400 -137.3600      18.7        62       103        60
OIR    2025130    131400   -9.2400 -137.3700      18.6        62       103        60
OIR    2025130    131400   -9.2400 -137.3800      18.6        62       103        60
OIR    2025130    131400   -9.2400 -137.3900      18.5        62       103        60
OIR    2025130    131400   -9.2400 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2400 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.2400 -137.4200      18.3        62       103        60
OIR    2025130    131400   -9.2400 -137.4300      18.0        61       103        60
OIR    2025130    131400   -9.2400 -137.4400      17.2        59       103        60
OIR    2025130    131400   -9.2400 -137.4500      14.0        49       103        60
OIR    2025130    131400   -9.2400 -137.4600      11.4        38       103        60
OIR    2025130    131400   -9.2400 -137.4700      10.6        34       104        60
OIR    2025130    131400   -9.2400 -137.4800      10.2        30       104        60
OIR    2025130    131400   -9.2400 -137.4900       9.2        26       108        60
OIR    2025130    131400   -9.2400 -137.5000       8.7        20       111        60
OIR    2025130    131400   -9.2400 -137.5100       8.4        15       116        60
OIR    2025130    131400   -9.2400 -137.5200       8.6         8       121        60
OIR    2025130    131400   -9.2400 -137.5300       9.1         2       121        60
OIR    2025130    131400   -9.2400 -137.5400       9.2       357       124        60
OIR    2025130    131400   -9.2400 -137.5500       9.3       353       127        60
OIR    2025130    131400   -9.2400 -137.5600       9.4       352       127        60
OIR    2025130    131400   -9.2400 -137.5700       9.4       351       127        60
OIR    2025130    131400   -9.2400 -137.5800       9.6       352       127        60
OIR    2025130    131400   -9.2400 -137.5900       9.8       352       127        60
OIR    2025130    131400   -9.2400 -137.6000       9.9       353       127        60
OIR    2025130    131400   -9.2400 -137.6100      10.1       353       127        60
OIR    2025130    131400   -9.2400 -137.6200      10.7       353       129        60
OIR    2025130    131400   -9.2400 -137.6300      11.3       352       130        60
OIR    2025130    131400   -9.2400 -137.6400      12.5       353       131        60
OIR    2025130    131400   -9.2400 -137.6500      13.2       353       131        60
OIR    2025130    131400   -9.2400 -137.6600      13.2       351       130        60
OIR    2025130    131400   -9.2400 -137.6700      12.7       349       130        60
OIR    2025130    131400   -9.2400 -137.6800      11.5       347       131        60
OIR    2025130    131400   -9.2400 -137.6900       9.8       342       131        60
OIR    2025130    131400   -9.2400 -137.7000       8.6       335       130        60
OIR    2025130    131400   -9.2400 -137.7100       7.9       329       129        60
OIR    2025130    131400   -9.2400 -137.7200       7.4       323       128        60
OIR    2025130    131400   -9.2400 -137.7300       6.8       316       126        60
OIR    2025130    131400   -9.2400 -137.7400       6.5       310       126        60
OIR    2025130    131400   -9.2400 -137.7500       6.2       304       127        60
OIR    2025130    131400   -9.2400 -137.7600       6.0       299       127        60
OIR    2025130    131400   -9.2400 -137.7700       5.9       294       126        60
OIR    2025130    131400   -9.2400 -137.7800       5.8       288       126        60
OIR    2025130    131400   -9.2400 -137.7900       5.8       285       125        60
OIR    2025130    131400   -9.2400 -137.8000       5.7       285       126        60
OIR    2025130    131400   -9.2400 -137.8100       5.7       284       127        60
OIR    2025130    131400   -9.2400 -137.8200       5.7       284       127        60
OIR    2025130    131400   -9.2400 -137.8300       5.6       283       128        60
OIR    2025130    131400   -9.2400 -137.8400       5.6       282       128        60
OIR    2025130    131400   -9.2400 -137.8500       5.6       281       129        60
OIR    2025130    131400   -9.2400 -137.8600       5.5       279       131        60
OIR    2025130    131400   -9.2400 -137.8700       5.6       276       130        60
OIR    2025130    131400   -9.2400 -137.8800       5.7       274       130        60
OIR    2025130    131400   -9.2400 -137.8900       5.7       273       128        60
OIR    2025130    131400   -9.2400 -137.9000       5.7       272       127        60
OIR    2025130    131400   -9.2400 -137.9100       5.7       272       123        60
OIR    2025130    131400   -9.2400 -137.9200       5.7       272       123        60
OIR    2025130    131400   -9.2400 -137.9300       5.8       271       128        60
OIR    2025130    131400   -9.2400 -137.9400       5.8       271       131        60
OIR    2025130    131400   -9.2400 -137.9500       5.9       271       134        60
OIR    2025130    131400   -9.2400 -137.9600       6.3       271       136        60
OIR    2025130    131400   -9.2400 -137.9700       7.5       272       138        60
OIR    2025130    131400   -9.2400 -137.9800       7.9       273       139        60
OIR    2025130    131400   -9.2400 -137.9900       8.1       274       141        60
OIR    2025130    131400   -9.2400 -138.0000       8.4       274       144        60
OIR    2025130    131400   -9.2400 -138.2400      21.7        64       136        60
OIR    2025130    131400   -9.2400 -138.2500      22.4        58       113        60
OIR    2025130    131400   -9.2400 -138.2600      22.7        30       104        60
OIR    2025130    131400   -9.2400 -138.2700      26.1        19       103        60
OIR    2025130    131400   -9.2400 -138.2800      26.7        19       103        60
OIR    2025130    131400   -9.2400 -138.2900      27.0        17       103        60
OIR    2025130    131400   -9.2400 -138.3000      27.0        15       103        60
OIR    2025130    131400   -9.2400 -138.3100      26.9        13       103        60
OIR    2025130    131400   -9.2400 -138.3200      27.1        12       103        60
OIR    2025130    131400   -9.2400 -138.3300      27.3        10       103        60
OIR    2025130    131400   -9.2400 -138.3400      27.6         8       103        60
OIR    2025130    131400   -9.2400 -138.3500      27.9         4       103        60
OIR    2025130    131400   -9.2400 -138.3600      28.1         2       103        60
OIR    2025130    131400   -9.2400 -138.3700      28.3         1       103        60
OIR    2025130    131400   -9.2400 -138.3800      28.4         0       103        60
OIR    2025130    131400   -9.2400 -138.3900      28.5       360       103        60
OIR    2025130    131400   -9.2400 -138.4000      28.6       359       103        60
OIR    2025130    131400   -9.2400 -138.4100      28.6       359       103        60
OIR    2025130    131400   -9.2400 -138.4200      28.7       358       103        60
OIR    2025130    131400   -9.2400 -138.4300      28.7       358       103        60
OIR    2025130    131400   -9.2400 -138.4400      28.7       358       103        60
OIR    2025130    131400   -9.2400 -138.4500      28.6       358       103        60
OIR    2025130    131400   -9.2400 -138.4600      28.5       357       103        60
OIR    2025130    131400   -9.2400 -138.4700      28.4       357       103        60
OIR    2025130    131400   -9.2400 -138.4800      28.3       357       103        60
OIR    2025130    131400   -9.2400 -138.4900      28.2       357       103        60
OIR    2025130    131400   -9.2400 -138.5000      28.1       357       103        60
OIR    2025130    131400   -9.2400 -138.5100      28.0       357       103        60
OIR    2025130    131400   -9.2400 -138.5200      27.9       357       103        60
OIR    2025130    131400   -9.2400 -138.5300      27.9       357       103        60
OIR    2025130    131400   -9.2400 -138.5400      27.8       357       103        60
OIR    2025130    131400   -9.2400 -138.5500      27.7       356       103        60
OIR    2025130    131400   -9.2400 -138.5600      27.6       356       103        60
OIR    2025130    131400   -9.2400 -138.5700      27.5       356       103        60
OIR    2025130    131400   -9.2400 -138.5800      27.5       356       103        60
OIR    2025130    131400   -9.2400 -138.5900      27.4       355       103        60
OIR    2025130    131400   -9.2400 -138.6000      27.3       354       103        60
OIR    2025130    131400   -9.2400 -138.6100      27.2       354       103        60
OIR    2025130    131400   -9.2400 -138.6200      27.1       353       103        60
OIR    2025130    131400   -9.2400 -138.6300      27.0       353       103        60
OIR    2025130    131400   -9.2400 -138.6400      26.8       352       103        60
OIR    2025130    131400   -9.2400 -138.6500      26.7       352       103        60
OIR    2025130    131400   -9.2400 -138.6600      26.5       351       103        60
OIR    2025130    131400   -9.2400 -138.6700      26.2       350       103        60
OIR    2025130    131400   -9.2400 -138.6800      25.7       348       103        60
OIR    2025130    131400   -9.2400 -138.6900      25.1       346       103        60
OIR    2025130    131400   -9.2400 -138.7000      24.4       343       103        60
OIR    2025130    131400   -9.2400 -138.7100      23.8       341       103        60
OIR    2025130    131400   -9.2400 -138.7200      23.3       340       103        60
OIR    2025130    131400   -9.2400 -138.7300      22.9       338       103        60
OIR    2025130    131400   -9.2400 -138.7400      22.5       337       103        60
OIR    2025130    131400   -9.2400 -138.7500      22.1       336       105        60
OIR    2025130    131400   -9.2400 -138.7600      21.8       334       108        60
OIR    2025130    131400   -9.2400 -138.7700      21.7       331       107        60
OIR    2025130    131400   -9.2400 -138.7800      21.7       330       107        60
OIR    2025130    131400   -9.2400 -138.7900      21.6       328       108        60
OIR    2025130    131400   -9.2400 -138.8000      21.6       327       111        60
OIR    2025130    131400   -9.2400 -138.8100      21.9       325       116        60
OIR    2025130    131400   -9.2400 -138.8200      22.2       324       116        60
OIR    2025130    131400   -9.2400 -138.8300      21.8       324       117        60
OIR    2025130    131400   -9.2400 -138.8400      21.2       322       117        60
OIR    2025130    131400   -9.2400 -138.8500      21.2       322       119        60
OIR    2025130    131400   -9.2400 -138.8600      21.9       322       120        60
OIR    2025130    131400   -9.2400 -138.8700      22.3       323       121        60
OIR    2025130    131400   -9.2400 -138.8800      22.6       323       121        60
OIR    2025130    131400   -9.2400 -138.8900      22.6       323       124        60
OIR    2025130    131400   -9.2400 -138.9000      22.6       323       129        60
OIR    2025130    131400   -9.2400 -138.9100      22.5       323       131        60
OIR    2025130    131400   -9.2400 -138.9200      22.4       323       132        60
OIR    2025130    131400   -9.2400 -138.9300      21.4       323       134        60
OIR    2025130    131400   -9.2400 -138.9400      18.2       321       136        60
OIR    2025130    131400   -9.2400 -138.9500      16.2       318       140        60
OIR    2025130    131400   -9.2400 -138.9600      15.4       315       144        60
OIR    2025130    131400   -9.2400 -138.9700      14.7       314       144        60
OIR    2025130    131400   -9.2400 -138.9800      13.6       314       142        60
OIR    2025130    131400   -9.2400 -138.9900      12.6       315       137        60
OIR    2025130    131400   -9.2400 -139.0000      11.5       319       142        60
OIR    2025130    131400   -9.2500 -136.2100      38.7        94       145        60
OIR    2025130    131400   -9.2500 -136.2200      38.8        94       145        60
OIR    2025130    131400   -9.2500 -136.2300      38.8        94       147        60
OIR    2025130    131400   -9.2500 -136.2900      39.1        93       144        60
OIR    2025130    131400   -9.2500 -136.4600      37.2        92       143        60
OIR    2025130    131400   -9.2500 -136.4700      36.9        91       138        60
OIR    2025130    131400   -9.2500 -136.4800      36.6        91       137        60
OIR    2025130    131400   -9.2500 -136.4900      36.1        91       136        60
OIR    2025130    131400   -9.2500 -136.5000      35.5        91       134        60
OIR    2025130    131400   -9.2500 -136.5100      35.0        91       131        60
OIR    2025130    131400   -9.2500 -136.5200      34.4        91       130        60
OIR    2025130    131400   -9.2500 -136.5300      33.9        91       128        60
OIR    2025130    131400   -9.2500 -136.5400      33.4        91       127        60
OIR    2025130    131400   -9.2500 -136.5500      32.9        91       125        60
OIR    2025130    131400   -9.2500 -136.5600      32.4        91       124        60
OIR    2025130    131400   -9.2500 -136.5700      31.9        91       124        60
OIR    2025130    131400   -9.2500 -136.5800      31.2        90       124        60
OIR    2025130    131400   -9.2500 -136.5900      30.3        89       122        60
OIR    2025130    131400   -9.2500 -136.6000      29.2        88       121        60
OIR    2025130    131400   -9.2500 -136.6100      28.1        86       122        60
OIR    2025130    131400   -9.2500 -136.6200      27.3        84       124        60
OIR    2025130    131400   -9.2500 -136.6300      26.9        83       124        60
OIR    2025130    131400   -9.2500 -136.6400      26.7        82       125        60
OIR    2025130    131400   -9.2500 -136.6500      26.5        81       124        60
OIR    2025130    131400   -9.2500 -136.6600      26.4        80       124        60
OIR    2025130    131400   -9.2500 -136.6700      26.2        80       123        60
OIR    2025130    131400   -9.2500 -136.6800      26.1        80       121        60
OIR    2025130    131400   -9.2500 -136.6900      26.1        79       117        60
OIR    2025130    131400   -9.2500 -136.7000      26.1        79       116        60
OIR    2025130    131400   -9.2500 -136.7100      26.1        78       116        60
OIR    2025130    131400   -9.2500 -136.7200      26.1        78       116        60
OIR    2025130    131400   -9.2500 -136.7300      26.2        77       116        60
OIR    2025130    131400   -9.2500 -136.7400      26.2        77       116        60
OIR    2025130    131400   -9.2500 -136.7500      26.2        76       116        60
OIR    2025130    131400   -9.2500 -136.7600      26.1        76       117        60
OIR    2025130    131400   -9.2500 -136.7700      26.0        75       116        60
OIR    2025130    131400   -9.2500 -136.7800      25.9        75       114        60
OIR    2025130    131400   -9.2500 -136.7900      25.8        75       116        60
OIR    2025130    131400   -9.2500 -136.8000      25.7        75       120        60
OIR    2025130    131400   -9.2500 -136.8100      25.4        75       122        60
OIR    2025130    131400   -9.2500 -136.8200      25.1        75       124        60
OIR    2025130    131400   -9.2500 -136.8300      25.1        75       122        60
OIR    2025130    131400   -9.2500 -136.8400      25.1        75       121        60
OIR    2025130    131400   -9.2500 -136.8500      25.1        75       116        60
OIR    2025130    131400   -9.2500 -136.8600      25.1        75       116        60
OIR    2025130    131400   -9.2500 -136.8700      25.2        75       116        60
OIR    2025130    131400   -9.2500 -136.8800      25.2        75       115        60
OIR    2025130    131400   -9.2500 -136.8900      25.3        76       114        60
OIR    2025130    131400   -9.2500 -136.9000      25.3        76       113        60
OIR    2025130    131400   -9.2500 -136.9100      25.4        76       111        60
OIR    2025130    131400   -9.2500 -136.9200      25.4        76       112        60
OIR    2025130    131400   -9.2500 -136.9300      25.4        76       113        60
OIR    2025130    131400   -9.2500 -136.9400      25.4        76       114        60
OIR    2025130    131400   -9.2500 -136.9500      25.4        76       114        60
OIR    2025130    131400   -9.2500 -136.9600      25.4        76       112        60
OIR    2025130    131400   -9.2500 -136.9700      25.4        75       111        60
OIR    2025130    131400   -9.2500 -136.9800      25.4        75       110        60
OIR    2025130    131400   -9.2500 -136.9900      25.4        75       108        60
OIR    2025130    131400   -9.2500 -137.0000      25.5        75       105        60
OIR    2025130    131400   -9.2500 -137.0100      25.5        74       105        60
OIR    2025130    131400   -9.2500 -137.0200      25.6        74       108        60
OIR    2025130    131400   -9.2500 -137.0300      25.6        74       110        60
OIR    2025130    131400   -9.2500 -137.0400      25.6        73       111        60
OIR    2025130    131400   -9.2500 -137.0500      25.7        72       111        60
OIR    2025130    131400   -9.2500 -137.0600      25.7        70       111        60
OIR    2025130    131400   -9.2500 -137.0700      25.9        67       113        60
OIR    2025130    131400   -9.2500 -137.0800      26.4        65       115        60
OIR    2025130    131400   -9.2500 -137.0900      27.0        63       119        60
OIR    2025130    131400   -9.2500 -137.1000      27.4        63       119        60
OIR    2025130    131400   -9.2500 -137.1100      27.6        63       119        60
OIR    2025130    131400   -9.2500 -137.1200      28.1        64       120        60
OIR    2025130    131400   -9.2500 -137.1300      28.5        65       122        60
OIR    2025130    131400   -9.2500 -137.1400      28.7        65       119        60
OIR    2025130    131400   -9.2500 -137.1500      28.7        66       115        60
OIR    2025130    131400   -9.2500 -137.1600      28.6        66       111        60
OIR    2025130    131400   -9.2500 -137.1700      28.4        66       108        60
OIR    2025130    131400   -9.2500 -137.1800      28.3        66       105        60
OIR    2025130    131400   -9.2500 -137.1900      28.1        66       105        60
OIR    2025130    131400   -9.2500 -137.2000      27.9        66       108        60
OIR    2025130    131400   -9.2500 -137.2100      27.3        66       107        60
OIR    2025130    131400   -9.2500 -137.2200      26.7        67       107        60
OIR    2025130    131400   -9.2500 -137.2300      26.1        68       107        60
OIR    2025130    131400   -9.2500 -137.2400      25.6        68       108        60
OIR    2025130    131400   -9.2500 -137.2500      25.2        68       105        60
OIR    2025130    131400   -9.2500 -137.2600      24.6        67       104        60
OIR    2025130    131400   -9.2500 -137.2700      24.2        65       104        60
OIR    2025130    131400   -9.2500 -137.2800      24.1        64       104        60
OIR    2025130    131400   -9.2500 -137.2900      23.4        63       105        60
OIR    2025130    131400   -9.2500 -137.3000      22.3        62       104        60
OIR    2025130    131400   -9.2500 -137.3100      21.0        62       103        60
OIR    2025130    131400   -9.2500 -137.3200      19.9        61       103        60
OIR    2025130    131400   -9.2500 -137.3300      19.4        61       103        60
OIR    2025130    131400   -9.2500 -137.3400      19.1        61       103        60
OIR    2025130    131400   -9.2500 -137.3500      18.9        61       103        60
OIR    2025130    131400   -9.2500 -137.3600      18.8        61       103        60
OIR    2025130    131400   -9.2500 -137.3700      18.7        61       103        60
OIR    2025130    131400   -9.2500 -137.3800      18.6        62       103        60
OIR    2025130    131400   -9.2500 -137.3900      18.5        62       103        60
OIR    2025130    131400   -9.2500 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2500 -137.4100      18.4        62       103        60
OIR    2025130    131400   -9.2500 -137.4200      18.2        61       103        60
OIR    2025130    131400   -9.2500 -137.4300      17.7        61       103        60
OIR    2025130    131400   -9.2500 -137.4400      16.7        59       103        60
OIR    2025130    131400   -9.2500 -137.4500      13.3        51       103        60
OIR    2025130    131400   -9.2500 -137.4600      10.8        40       103        60
OIR    2025130    131400   -9.2500 -137.4700       9.7        33       104        60
OIR    2025130    131400   -9.2500 -137.4800       8.9        28       105        60
OIR    2025130    131400   -9.2500 -137.4900       8.0        21       108        60
OIR    2025130    131400   -9.2500 -137.5000       7.4        14       111        60
OIR    2025130    131400   -9.2500 -137.5100       7.3         8       115        60
OIR    2025130    131400   -9.2500 -137.5200       7.7         2       117        60
OIR    2025130    131400   -9.2500 -137.5300       8.2       358       117        60
OIR    2025130    131400   -9.2500 -137.5400       8.8       355       119        60
OIR    2025130    131400   -9.2500 -137.5500       9.1       352       121        60
OIR    2025130    131400   -9.2500 -137.5600       9.3       351       121        60
OIR    2025130    131400   -9.2500 -137.5700       9.4       351       122        60
OIR    2025130    131400   -9.2500 -137.5800       9.4       351       123        60
OIR    2025130    131400   -9.2500 -137.5900       9.6       351       123        60
OIR    2025130    131400   -9.2500 -137.6000       9.6       351       122        60
OIR    2025130    131400   -9.2500 -137.6100       9.7       351       122        60
OIR    2025130    131400   -9.2500 -137.6200       9.9       351       123        60
OIR    2025130    131400   -9.2500 -137.6300      10.2       350       124        60
OIR    2025130    131400   -9.2500 -137.6400      10.4       350       125        60
OIR    2025130    131400   -9.2500 -137.6500      10.5       350       126        60
OIR    2025130    131400   -9.2500 -137.6600      10.5       350       127        60
OIR    2025130    131400   -9.2500 -137.6700       9.9       348       128        60
OIR    2025130    131400   -9.2500 -137.6800       8.6       343       128        60
OIR    2025130    131400   -9.2500 -137.6900       7.1       334       128        60
OIR    2025130    131400   -9.2500 -137.7000       6.4       322       128        60
OIR    2025130    131400   -9.2500 -137.7100       6.2       313       127        60
OIR    2025130    131400   -9.2500 -137.7200       6.0       306       126        60
OIR    2025130    131400   -9.2500 -137.7300       5.9       299       124        60
OIR    2025130    131400   -9.2500 -137.7400       5.9       295       125        60
OIR    2025130    131400   -9.2500 -137.7500       5.8       292       127        60
OIR    2025130    131400   -9.2500 -137.7600       5.8       288       127        60
OIR    2025130    131400   -9.2500 -137.7700       5.8       286       126        60
OIR    2025130    131400   -9.2500 -137.7800       5.8       285       125        60
OIR    2025130    131400   -9.2500 -137.7900       5.8       285       125        60
OIR    2025130    131400   -9.2500 -137.8000       5.8       284       125        60
OIR    2025130    131400   -9.2500 -137.8100       5.8       284       126        60
OIR    2025130    131400   -9.2500 -137.8200       5.7       284       126        60
OIR    2025130    131400   -9.2500 -137.8300       5.7       283       127        60
OIR    2025130    131400   -9.2500 -137.8400       5.7       282       127        60
OIR    2025130    131400   -9.2500 -137.8500       5.7       282       128        60
OIR    2025130    131400   -9.2500 -137.8600       5.6       280       130        60
OIR    2025130    131400   -9.2500 -137.8700       5.7       277       131        60
OIR    2025130    131400   -9.2500 -137.8800       5.7       275       131        60
OIR    2025130    131400   -9.2500 -137.8900       5.7       273       130        60
OIR    2025130    131400   -9.2500 -137.9000       5.7       273       128        60
OIR    2025130    131400   -9.2500 -137.9100       5.7       272       123        60
OIR    2025130    131400   -9.2500 -137.9200       5.7       272       122        60
OIR    2025130    131400   -9.2500 -137.9300       5.8       272       127        60
OIR    2025130    131400   -9.2500 -137.9400       5.8       272       130        60
OIR    2025130    131400   -9.2500 -137.9500       5.9       271       134        60
OIR    2025130    131400   -9.2500 -137.9600       6.1       272       137        60
OIR    2025130    131400   -9.2500 -137.9700       7.5       273       139        60
OIR    2025130    131400   -9.2500 -137.9800       7.9       273       141        60
OIR    2025130    131400   -9.2500 -137.9900       8.2       274       142        60
OIR    2025130    131400   -9.2500 -138.0000       8.4       274       144        60
OIR    2025130    131400   -9.2500 -138.0100       8.5       274       146        60
OIR    2025130    131400   -9.2500 -138.2400      27.2        56       136        60
OIR    2025130    131400   -9.2500 -138.2500      27.9        52       116        60
OIR    2025130    131400   -9.2500 -138.2600      24.6        33       104        60
OIR    2025130    131400   -9.2500 -138.2700      26.3        20       103        60
OIR    2025130    131400   -9.2500 -138.2800      27.0        19       103        60
OIR    2025130    131400   -9.2500 -138.2900      27.0        17       103        60
OIR    2025130    131400   -9.2500 -138.3000      27.2        16       103        60
OIR    2025130    131400   -9.2500 -138.3100      27.4        14       103        60
OIR    2025130    131400   -9.2500 -138.3200      27.3        13       103        60
OIR    2025130    131400   -9.2500 -138.3300      27.6        11       103        60
OIR    2025130    131400   -9.2500 -138.3400      28.1        10       103        60
OIR    2025130    131400   -9.2500 -138.3500      28.2         5       103        60
OIR    2025130    131400   -9.2500 -138.3600      28.4         2       103        60
OIR    2025130    131400   -9.2500 -138.3700      28.5         1       103        60
OIR    2025130    131400   -9.2500 -138.3800      28.6         0       103        60
OIR    2025130    131400   -9.2500 -138.3900      28.7       360       103        60
OIR    2025130    131400   -9.2500 -138.4000      28.8       359       103        60
OIR    2025130    131400   -9.2500 -138.4100      28.8       359       103        60
OIR    2025130    131400   -9.2500 -138.4200      28.8       358       103        60
OIR    2025130    131400   -9.2500 -138.4300      28.8       358       103        60
OIR    2025130    131400   -9.2500 -138.4400      28.8       358       103        60
OIR    2025130    131400   -9.2500 -138.4500      28.8       358       103        60
OIR    2025130    131400   -9.2500 -138.4600      28.7       357       103        60
OIR    2025130    131400   -9.2500 -138.4700      28.6       357       103        60
OIR    2025130    131400   -9.2500 -138.4800      28.5       357       103        60
OIR    2025130    131400   -9.2500 -138.4900      28.4       357       103        60
OIR    2025130    131400   -9.2500 -138.5000      28.3       357       103        60
OIR    2025130    131400   -9.2500 -138.5100      28.2       357       103        60
OIR    2025130    131400   -9.2500 -138.5200      28.1       357       103        60
OIR    2025130    131400   -9.2500 -138.5300      28.0       357       103        60
OIR    2025130    131400   -9.2500 -138.5400      28.0       357       103        60
OIR    2025130    131400   -9.2500 -138.5500      27.9       356       103        60
OIR    2025130    131400   -9.2500 -138.5600      27.8       356       103        60
OIR    2025130    131400   -9.2500 -138.5700      27.7       356       103        60
OIR    2025130    131400   -9.2500 -138.5800      27.7       355       103        60
OIR    2025130    131400   -9.2500 -138.5900      27.6       354       103        60
OIR    2025130    131400   -9.2500 -138.6000      27.5       354       103        60
OIR    2025130    131400   -9.2500 -138.6100      27.3       353       103        60
OIR    2025130    131400   -9.2500 -138.6200      27.2       353       103        60
OIR    2025130    131400   -9.2500 -138.6300      27.0       352       103        60
OIR    2025130    131400   -9.2500 -138.6400      26.9       352       103        60
OIR    2025130    131400   -9.2500 -138.6500      26.8       351       103        60
OIR    2025130    131400   -9.2500 -138.6600      26.6       351       103        60
OIR    2025130    131400   -9.2500 -138.6700      26.3       349       103        60
OIR    2025130    131400   -9.2500 -138.6800      25.8       347       103        60
OIR    2025130    131400   -9.2500 -138.6900      25.2       344       103        60
OIR    2025130    131400   -9.2500 -138.7000      24.6       342       103        60
OIR    2025130    131400   -9.2500 -138.7100      24.2       341       103        60
OIR    2025130    131400   -9.2500 -138.7200      23.7       339       103        60
OIR    2025130    131400   -9.2500 -138.7300      23.2       338       103        60
OIR    2025130    131400   -9.2500 -138.7400      22.9       337       103        60
OIR    2025130    131400   -9.2500 -138.7500      22.6       335       104        60
OIR    2025130    131400   -9.2500 -138.7600      22.4       332       105        60
OIR    2025130    131400   -9.2500 -138.7700      22.2       330       105        60
OIR    2025130    131400   -9.2500 -138.7800      22.0       328       108        60
OIR    2025130    131400   -9.2500 -138.7900      22.0       327       110        60
OIR    2025130    131400   -9.2500 -138.8000      22.1       326       114        60
OIR    2025130    131400   -9.2500 -138.8100      22.4       325       120        60
OIR    2025130    131400   -9.2500 -138.8200      22.5       324       119        60
OIR    2025130    131400   -9.2500 -138.8300      22.5       324       117        60
OIR    2025130    131400   -9.2500 -138.8400      22.5       324       119        60
OIR    2025130    131400   -9.2500 -138.8500      22.3       323       120        60
OIR    2025130    131400   -9.2500 -138.8600      22.4       323       122        60
OIR    2025130    131400   -9.2500 -138.8700      22.6       323       124        60
OIR    2025130    131400   -9.2500 -138.8800      22.7       323       125        60
OIR    2025130    131400   -9.2500 -138.8900      22.6       323       128        60
OIR    2025130    131400   -9.2500 -138.9000      22.6       323       131        60
OIR    2025130    131400   -9.2500 -138.9100      22.5       323       132        60
OIR    2025130    131400   -9.2500 -138.9200      22.3       323       132        60
OIR    2025130    131400   -9.2500 -138.9300      20.7       324       134        60
OIR    2025130    131400   -9.2500 -138.9400      17.9       323       136        60
OIR    2025130    131400   -9.2500 -138.9500      16.7       319       141        60
OIR    2025130    131400   -9.2500 -138.9600      16.1       317       145        60
OIR    2025130    131400   -9.2500 -138.9900      12.9       317       144        60
OIR    2025130    131400   -9.2500 -139.0000      11.6       320       146        60
OIR    2025130    131400   -9.2600 -136.3400      38.9        91       145        60
OIR    2025130    131400   -9.2600 -136.4600      36.9        90       143        60
OIR    2025130    131400   -9.2600 -136.4700      36.7        90       141        60
OIR    2025130    131400   -9.2600 -136.4800      36.4        90       140        60
OIR    2025130    131400   -9.2600 -136.4900      36.1        90       139        60
OIR    2025130    131400   -9.2600 -136.5000      35.6        90       137        60
OIR    2025130    131400   -9.2600 -136.5100      35.1        90       134        60
OIR    2025130    131400   -9.2600 -136.5200      34.5        90       131        60
OIR    2025130    131400   -9.2600 -136.5300      34.0        90       130        60
OIR    2025130    131400   -9.2600 -136.5400      33.6        90       130        60
OIR    2025130    131400   -9.2600 -136.5500      33.1        90       129        60
OIR    2025130    131400   -9.2600 -136.5600      32.4        90       128        60
OIR    2025130    131400   -9.2600 -136.5700      31.8        90       128        60
OIR    2025130    131400   -9.2600 -136.5800      31.1        89       129        60
OIR    2025130    131400   -9.2600 -136.5900      30.1        88       128        60
OIR    2025130    131400   -9.2600 -136.6000      29.1        87       127        60
OIR    2025130    131400   -9.2600 -136.6100      27.9        85       127        60
OIR    2025130    131400   -9.2600 -136.6200      27.2        83       127        60
OIR    2025130    131400   -9.2600 -136.6300      26.8        82       127        60
OIR    2025130    131400   -9.2600 -136.6400      26.6        81       127        60
OIR    2025130    131400   -9.2600 -136.6500      26.5        80       126        60
OIR    2025130    131400   -9.2600 -136.6600      26.4        80       126        60
OIR    2025130    131400   -9.2600 -136.6700      26.3        79       127        60
OIR    2025130    131400   -9.2600 -136.6800      26.2        79       126        60
OIR    2025130    131400   -9.2600 -136.6900      26.1        78       123        60
OIR    2025130    131400   -9.2600 -136.7000      26.1        78       123        60
OIR    2025130    131400   -9.2600 -136.7100      26.1        76       122        60
OIR    2025130    131400   -9.2600 -136.7200      26.1        76       123        60
OIR    2025130    131400   -9.2600 -136.7300      26.1        75       124        60
OIR    2025130    131400   -9.2600 -136.7400      26.1        75       124        60
OIR    2025130    131400   -9.2600 -136.7500      26.1        75       123        60
OIR    2025130    131400   -9.2600 -136.7600      26.1        75       121        60
OIR    2025130    131400   -9.2600 -136.7700      26.0        75       120        60
OIR    2025130    131400   -9.2600 -136.7800      26.0        75       120        60
OIR    2025130    131400   -9.2600 -136.7900      25.9        75       121        60
OIR    2025130    131400   -9.2600 -136.8000      25.8        75       124        60
OIR    2025130    131400   -9.2600 -136.8100      25.6        75       126        60
OIR    2025130    131400   -9.2600 -136.8200      25.1        75       128        60
OIR    2025130    131400   -9.2600 -136.8300      25.1        75       126        60
OIR    2025130    131400   -9.2600 -136.8400      25.1        75       124        60
OIR    2025130    131400   -9.2600 -136.8500      25.1        75       120        60
OIR    2025130    131400   -9.2600 -136.8600      25.1        75       117        60
OIR    2025130    131400   -9.2600 -136.8700      25.2        75       117        60
OIR    2025130    131400   -9.2600 -136.8800      25.3        75       116        60
OIR    2025130    131400   -9.2600 -136.8900      25.3        75       116        60
OIR    2025130    131400   -9.2600 -136.9000      25.4        76       115        60
OIR    2025130    131400   -9.2600 -136.9100      25.4        76       114        60
OIR    2025130    131400   -9.2600 -136.9200      25.4        76       115        60
OIR    2025130    131400   -9.2600 -136.9300      25.4        75       116        60
OIR    2025130    131400   -9.2600 -136.9400      25.5        75       116        60
OIR    2025130    131400   -9.2600 -136.9500      25.5        75       116        60
OIR    2025130    131400   -9.2600 -136.9600      25.5        75       115        60
OIR    2025130    131400   -9.2600 -136.9700      25.5        75       114        60
OIR    2025130    131400   -9.2600 -136.9800      25.5        75       113        60
OIR    2025130    131400   -9.2600 -136.9900      25.6        74       111        60
OIR    2025130    131400   -9.2600 -137.0000      25.7        74       109        60
OIR    2025130    131400   -9.2600 -137.0100      25.8        74       109        60
OIR    2025130    131400   -9.2600 -137.0200      25.9        73       111        60
OIR    2025130    131400   -9.2600 -137.0300      26.0        72       113        60
OIR    2025130    131400   -9.2600 -137.0400      26.1        71       115        60
OIR    2025130    131400   -9.2600 -137.0500      26.3        70       114        60
OIR    2025130    131400   -9.2600 -137.0600      26.3        67       114        60
OIR    2025130    131400   -9.2600 -137.0700      26.6        64       116        60
OIR    2025130    131400   -9.2600 -137.0800      27.0        63       119        60
OIR    2025130    131400   -9.2600 -137.0900      27.3        63       122        60
OIR    2025130    131400   -9.2600 -137.1000      27.5        63       120        60
OIR    2025130    131400   -9.2600 -137.1100      27.7        63       117        60
OIR    2025130    131400   -9.2600 -137.1200      28.2        64       119        60
OIR    2025130    131400   -9.2600 -137.1300      28.7        65       120        60
OIR    2025130    131400   -9.2600 -137.1400      28.8        65       120        60
OIR    2025130    131400   -9.2600 -137.1500      28.8        65       119        60
OIR    2025130    131400   -9.2600 -137.1600      28.7        66       115        60
OIR    2025130    131400   -9.2600 -137.1700      28.6        66       112        60
OIR    2025130    131400   -9.2600 -137.1800      28.4        66       108        60
OIR    2025130    131400   -9.2600 -137.1900      28.2        66       107        60
OIR    2025130    131400   -9.2600 -137.2000      28.1        65       108        60
OIR    2025130    131400   -9.2600 -137.2100      27.9        65       107        60
OIR    2025130    131400   -9.2600 -137.2200      27.7        66       107        60
OIR    2025130    131400   -9.2600 -137.2300      27.4        66       107        60
OIR    2025130    131400   -9.2600 -137.2400      27.0        66       108        60
OIR    2025130    131400   -9.2600 -137.2500      26.5        66       105        60
OIR    2025130    131400   -9.2600 -137.2600      25.8        65       104        60
OIR    2025130    131400   -9.2600 -137.2700      25.5        64       105        60
OIR    2025130    131400   -9.2600 -137.2800      25.4        63       105        60
OIR    2025130    131400   -9.2600 -137.2900      25.2        63       104        60
OIR    2025130    131400   -9.2600 -137.3000      24.4        62       104        60
OIR    2025130    131400   -9.2600 -137.3100      22.8        61       103        60
OIR    2025130    131400   -9.2600 -137.3200      20.9        61       103        60
OIR    2025130    131400   -9.2600 -137.3300      19.7        61       103        60
OIR    2025130    131400   -9.2600 -137.3400      19.3        61       103        60
OIR    2025130    131400   -9.2600 -137.3500      19.1        61       103        60
OIR    2025130    131400   -9.2600 -137.3600      19.0        61       103        60
OIR    2025130    131400   -9.2600 -137.3700      18.8        61       103        60
OIR    2025130    131400   -9.2600 -137.3800      18.6        61       103        60
OIR    2025130    131400   -9.2600 -137.3900      18.5        61       103        60
OIR    2025130    131400   -9.2600 -137.4000      18.5        62       103        60
OIR    2025130    131400   -9.2600 -137.4100      18.3        62       103        60
OIR    2025130    131400   -9.2600 -137.4200      17.9        61       103        60
OIR    2025130    131400   -9.2600 -137.4300      17.1        61       103        60
OIR    2025130    131400   -9.2600 -137.4400      15.9        59       103        60
OIR    2025130    131400   -9.2600 -137.4500      12.8        53       103        60
OIR    2025130    131400   -9.2600 -137.4600       9.9        42       103        60
OIR    2025130    131400   -9.2600 -137.4700       8.7        35       104        60
OIR    2025130    131400   -9.2600 -137.4800       7.7        28       104        60
OIR    2025130    131400   -9.2600 -137.4900       6.7        18       107        60
OIR    2025130    131400   -9.2600 -137.5000       6.4         9       108        60
OIR    2025130    131400   -9.2600 -137.5100       6.4         3       111        60
OIR    2025130    131400   -9.2600 -137.5200       6.9       358       113        60
OIR    2025130    131400   -9.2600 -137.5300       7.6       354       114        60
OIR    2025130    131400   -9.2600 -137.5400       8.1       352       114        60
OIR    2025130    131400   -9.2600 -137.5500       8.7       350       114        60
OIR    2025130    131400   -9.2600 -137.5600       9.0       350       115        60
OIR    2025130    131400   -9.2600 -137.5700       9.2       350       116        60
OIR    2025130    131400   -9.2600 -137.5800       9.4       350       116        60
OIR    2025130    131400   -9.2600 -137.5900       9.4       350       116        60
OIR    2025130    131400   -9.2600 -137.6000       9.4       350       116        60
OIR    2025130    131400   -9.2600 -137.6100       9.4       350       116        60
OIR    2025130    131400   -9.2600 -137.6200       9.6       350       117        60
OIR    2025130    131400   -9.2600 -137.6300       9.8       349       119        60
OIR    2025130    131400   -9.2600 -137.6400       9.8       349       121        60
OIR    2025130    131400   -9.2600 -137.6500       9.4       348       122        60
OIR    2025130    131400   -9.2600 -137.6600       8.3       345       124        60
OIR    2025130    131400   -9.2600 -137.6700       7.2       340       125        60
OIR    2025130    131400   -9.2600 -137.6800       6.1       333       126        60
OIR    2025130    131400   -9.2600 -137.6900       5.4       318       126        60
OIR    2025130    131400   -9.2600 -137.7000       5.4       305       126        60
OIR    2025130    131400   -9.2600 -137.7100       5.5       297       125        60
OIR    2025130    131400   -9.2600 -137.7200       5.6       292       124        60
OIR    2025130    131400   -9.2600 -137.7300       5.7       289       124        60
OIR    2025130    131400   -9.2600 -137.7400       5.8       287       125        60
OIR    2025130    131400   -9.2600 -137.7500       5.8       286       127        60
OIR    2025130    131400   -9.2600 -137.7600       5.8       285       127        60
OIR    2025130    131400   -9.2600 -137.7700       5.8       285       127        60
OIR    2025130    131400   -9.2600 -137.7800       5.8       284       125        60
OIR    2025130    131400   -9.2600 -137.7900       5.8       284       124        60
OIR    2025130    131400   -9.2600 -137.8000       5.8       284       124        60
OIR    2025130    131400   -9.2600 -137.8100       5.8       284       125        60
OIR    2025130    131400   -9.2600 -137.8200       5.8       284       125        60
OIR    2025130    131400   -9.2600 -137.8300       5.7       283       125        60
OIR    2025130    131400   -9.2600 -137.8400       5.7       283       126        60
OIR    2025130    131400   -9.2600 -137.8500       5.7       282       128        60
OIR    2025130    131400   -9.2600 -137.8600       5.7       280       130        60
OIR    2025130    131400   -9.2600 -137.8700       5.7       278       132        60
OIR    2025130    131400   -9.2600 -137.8800       5.8       275       132        60
OIR    2025130    131400   -9.2600 -137.8900       5.8       274       132        60
OIR    2025130    131400   -9.2600 -137.9000       5.8       273       130        60
OIR    2025130    131400   -9.2600 -137.9100       5.8       273       125        60
OIR    2025130    131400   -9.2600 -137.9200       5.8       272       123        60
OIR    2025130    131400   -9.2600 -137.9300       5.8       272       126        60
OIR    2025130    131400   -9.2600 -137.9400       5.8       272       130        60
OIR    2025130    131400   -9.2600 -137.9500       5.9       272       134        60
OIR    2025130    131400   -9.2600 -137.9600       6.2       272       138        60
OIR    2025130    131400   -9.2600 -137.9700       7.5       273       142        60
OIR    2025130    131400   -9.2600 -137.9800       8.0       274       144        60
OIR    2025130    131400   -9.2600 -137.9900       8.3       274       146        60
OIR    2025130    131400   -9.2600 -138.0000       8.4       275       146        60
OIR    2025130    131400   -9.2600 -138.0100       8.5       275       147        60
OIR    2025130    131400   -9.2600 -138.2500      28.3        44       137        60
OIR    2025130    131400   -9.2600 -138.2600      28.3        35       108        60
OIR    2025130    131400   -9.2600 -138.2700      27.2        24       103        60
OIR    2025130    131400   -9.2600 -138.2800      26.7        19       103        60
OIR    2025130    131400   -9.2600 -138.2900      26.7        17       103        60
OIR    2025130    131400   -9.2600 -138.3000      27.0        16       103        60
OIR    2025130    131400   -9.2600 -138.3100      27.9        15       103        60
OIR    2025130    131400   -9.2600 -138.3200      28.5        15       103        60
OIR    2025130    131400   -9.2600 -138.3300      29.2        14       103        60
OIR    2025130    131400   -9.2600 -138.3400      29.2        12       103        60
OIR    2025130    131400   -9.2600 -138.3500      28.7         7       103        60
OIR    2025130    131400   -9.2600 -138.3600      28.7         2       103        60
OIR    2025130    131400   -9.2600 -138.3700      28.8         1       103        60
OIR    2025130    131400   -9.2600 -138.3800      28.8         0       103        60
OIR    2025130    131400   -9.2600 -138.3900      28.9       359       103        60
OIR    2025130    131400   -9.2600 -138.4000      28.9       359       103        60
OIR    2025130    131400   -9.2600 -138.4100      29.0       359       103        60
OIR    2025130    131400   -9.2600 -138.4200      29.0       358       103        60
OIR    2025130    131400   -9.2600 -138.4300      28.9       358       103        60
OIR    2025130    131400   -9.2600 -138.4400      28.9       358       103        60
OIR    2025130    131400   -9.2600 -138.4500      28.9       358       103        60
OIR    2025130    131400   -9.2600 -138.4600      28.9       357       103        60
OIR    2025130    131400   -9.2600 -138.4700      28.8       357       103        60
OIR    2025130    131400   -9.2600 -138.4800      28.8       357       103        60
OIR    2025130    131400   -9.2600 -138.4900      28.7       357       103        60
OIR    2025130    131400   -9.2600 -138.5000      28.6       357       103        60
OIR    2025130    131400   -9.2600 -138.5100      28.6       357       103        60
OIR    2025130    131400   -9.2600 -138.5200      28.5       357       103        60
OIR    2025130    131400   -9.2600 -138.5300      28.4       357       103        60
OIR    2025130    131400   -9.2600 -138.5400      28.3       356       103        60
OIR    2025130    131400   -9.2600 -138.5500      28.2       356       103        60
OIR    2025130    131400   -9.2600 -138.5600      28.3       355       103        60
OIR    2025130    131400   -9.2600 -138.5700      28.3       355       103        60
OIR    2025130    131400   -9.2600 -138.5800      28.1       354       103        60
OIR    2025130    131400   -9.2600 -138.5900      27.9       354       103        60
OIR    2025130    131400   -9.2600 -138.6000      27.6       353       103        60
OIR    2025130    131400   -9.2600 -138.6100      27.4       353       103        60
OIR    2025130    131400   -9.2600 -138.6200      27.3       353       103        60
OIR    2025130    131400   -9.2600 -138.6300      27.2       352       103        60
OIR    2025130    131400   -9.2600 -138.6400      27.0       352       103        60
OIR    2025130    131400   -9.2600 -138.6500      26.9       351       103        60
OIR    2025130    131400   -9.2600 -138.6600      26.7       350       103        60
OIR    2025130    131400   -9.2600 -138.6700      26.4       348       103        60
OIR    2025130    131400   -9.2600 -138.6800      25.8       346       103        60
OIR    2025130    131400   -9.2600 -138.6900      25.3       343       103        60
OIR    2025130    131400   -9.2600 -138.7000      24.9       341       103        60
OIR    2025130    131400   -9.2600 -138.7100      24.5       340       103        60
OIR    2025130    131400   -9.2600 -138.7200      24.1       339       103        60
OIR    2025130    131400   -9.2600 -138.7300      23.7       337       103        60
OIR    2025130    131400   -9.2600 -138.7400      23.3       335       103        60
OIR    2025130    131400   -9.2600 -138.7500      23.2       332       103        60
OIR    2025130    131400   -9.2600 -138.7600      23.0       330       104        60
OIR    2025130    131400   -9.2600 -138.7700      22.8       328       105        60
OIR    2025130    131400   -9.2600 -138.7800      22.7       327       109        60
OIR    2025130    131400   -9.2600 -138.7900      22.6       326       113        60
OIR    2025130    131400   -9.2600 -138.8000      22.5       326       116        60
OIR    2025130    131400   -9.2600 -138.8100      22.6       325       123        60
OIR    2025130    131400   -9.2600 -138.8200      22.6       324       121        60
OIR    2025130    131400   -9.2600 -138.8300      22.7       324       117        60
OIR    2025130    131400   -9.2600 -138.8400      22.7       324       119        60
OIR    2025130    131400   -9.2600 -138.8500      22.7       324       120        60
OIR    2025130    131400   -9.2600 -138.8600      22.7       324       124        60
OIR    2025130    131400   -9.2600 -138.8700      22.7       324       128        60
OIR    2025130    131400   -9.2600 -138.8800      22.7       324       131        60
OIR    2025130    131400   -9.2600 -138.8900      22.7       324       132        60
OIR    2025130    131400   -9.2600 -138.9000      22.6       324       133        60
OIR    2025130    131400   -9.2600 -138.9100      22.6       324       132        60
OIR    2025130    131400   -9.2600 -138.9200      22.4       324       132        60
OIR    2025130    131400   -9.2600 -138.9300      20.6       324       133        60
OIR    2025130    131400   -9.2600 -138.9400      17.9       324       136        60
OIR    2025130    131400   -9.2600 -138.9500      17.5       321       142        60
OIR    2025130    131400   -9.2600 -138.9600      17.1       319       147        60
OIR    2025130    131400   -9.2700 -136.3200      38.3        90       145        60
OIR    2025130    131400   -9.2700 -136.3300      38.3        90       145        60
OIR    2025130    131400   -9.2700 -136.3400      38.2        90       145        60
OIR    2025130    131400   -9.2700 -136.3500      38.2        89       146        60
OIR    2025130    131400   -9.2700 -136.4500      36.9        90       145        60
OIR    2025130    131400   -9.2700 -136.4600      36.8        90       143        60
OIR    2025130    131400   -9.2700 -136.4700      36.6        90       142        60
OIR    2025130    131400   -9.2700 -136.4800      36.4        90       141        60
OIR    2025130    131400   -9.2700 -136.4900      36.1        90       139        60
OIR    2025130    131400   -9.2700 -136.5000      35.6        90       137        60
OIR    2025130    131400   -9.2700 -136.5100      35.1        90       135        60
OIR    2025130    131400   -9.2700 -136.5200      34.6        90       132        60
OIR    2025130    131400   -9.2700 -136.5300      34.2        90       130        60
OIR    2025130    131400   -9.2700 -136.5400      33.8        90       131        60
OIR    2025130    131400   -9.2700 -136.5500      33.2        89       130        60
OIR    2025130    131400   -9.2700 -136.5600      32.5        89       130        60
OIR    2025130    131400   -9.2700 -136.5700      31.9        89       130        60
OIR    2025130    131400   -9.2700 -136.5800      31.0        88       130        60
OIR    2025130    131400   -9.2700 -136.5900      30.0        87       129        60
OIR    2025130    131400   -9.2700 -136.6000      28.8        85       129        60
OIR    2025130    131400   -9.2700 -136.6100      27.8        83       129        60
OIR    2025130    131400   -9.2700 -136.6200      27.1        82       129        60
OIR    2025130    131400   -9.2700 -136.6300      26.8        81       128        60
OIR    2025130    131400   -9.2700 -136.6400      26.6        80       128        60
OIR    2025130    131400   -9.2700 -136.6500      26.5        79       126        60
OIR    2025130    131400   -9.2700 -136.6600      26.4        79       127        60
OIR    2025130    131400   -9.2700 -136.6700      26.3        78       127        60
OIR    2025130    131400   -9.2700 -136.6800      26.2        78       127        60
OIR    2025130    131400   -9.2700 -136.6900      26.2        77       125        60
OIR    2025130    131400   -9.2700 -136.7000      26.2        76       124        60
OIR    2025130    131400   -9.2700 -136.7100      26.2        76       124        60
OIR    2025130    131400   -9.2700 -136.7200      26.1        75       125        60
OIR    2025130    131400   -9.2700 -136.7300      26.1        75       126        60
OIR    2025130    131400   -9.2700 -136.7400      26.1        75       126        60
OIR    2025130    131400   -9.2700 -136.7500      26.1        75       124        60
OIR    2025130    131400   -9.2700 -136.7600      26.1        75       122        60
OIR    2025130    131400   -9.2700 -136.7700      26.0        75       121        60
OIR    2025130    131400   -9.2700 -136.7800      26.0        75       121        60
OIR    2025130    131400   -9.2700 -136.7900      25.9        75       123        60
OIR    2025130    131400   -9.2700 -136.8000      25.9        75       125        60
OIR    2025130    131400   -9.2700 -136.8100      25.8        75       128        60
OIR    2025130    131400   -9.2700 -136.8200      25.2        75       129        60
OIR    2025130    131400   -9.2700 -136.8300      25.1        75       127        60
OIR    2025130    131400   -9.2700 -136.8400      25.1        75       125        60
OIR    2025130    131400   -9.2700 -136.8500      25.1        75       121        60
OIR    2025130    131400   -9.2700 -136.8600      25.2        75       119        60
OIR    2025130    131400   -9.2700 -136.8700      25.2        75       117        60
OIR    2025130    131400   -9.2700 -136.8800      25.3        75       117        60
OIR    2025130    131400   -9.2700 -136.8900      25.4        75       116        60
OIR    2025130    131400   -9.2700 -136.9000      25.4        75       116        60
OIR    2025130    131400   -9.2700 -136.9100      25.5        75       115        60
OIR    2025130    131400   -9.2700 -136.9200      25.5        75       116        60
OIR    2025130    131400   -9.2700 -136.9300      25.5        75       117        60
OIR    2025130    131400   -9.2700 -136.9400      25.6        75       117        60
OIR    2025130    131400   -9.2700 -136.9500      25.6        75       117        60
OIR    2025130    131400   -9.2700 -136.9600      25.6        75       116        60
OIR    2025130    131400   -9.2700 -136.9700      25.6        75       116        60
OIR    2025130    131400   -9.2700 -136.9800      25.7        74       115        60
OIR    2025130    131400   -9.2700 -136.9900      25.8        74       113        60
OIR    2025130    131400   -9.2700 -137.0000      26.0        73       111        60
OIR    2025130    131400   -9.2700 -137.0100      26.2        73       111        60
OIR    2025130    131400   -9.2700 -137.0200      26.4        72       113        60
OIR    2025130    131400   -9.2700 -137.0300      26.6        71       115        60
OIR    2025130    131400   -9.2700 -137.0400      26.7        69       116        60
OIR    2025130    131400   -9.2700 -137.0500      26.8        68       116        60
OIR    2025130    131400   -9.2700 -137.0600      26.8        65       116        60
OIR    2025130    131400   -9.2700 -137.0700      27.0        64       119        60
OIR    2025130    131400   -9.2700 -137.0800      27.2        63       121        60
OIR    2025130    131400   -9.2700 -137.0900      27.4        63       120        60
OIR    2025130    131400   -9.2700 -137.1000      27.6        63       116        60
OIR    2025130    131400   -9.2700 -137.1100      27.8        64       114        60
OIR    2025130    131400   -9.2700 -137.1200      28.1        64       114        60
OIR    2025130    131400   -9.2700 -137.1300      28.7        65       115        60
OIR    2025130    131400   -9.2700 -137.1400      28.8        65       117        60
OIR    2025130    131400   -9.2700 -137.1500      28.8        65       119        60
OIR    2025130    131400   -9.2700 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.2700 -137.1700      28.6        65       114        60
OIR    2025130    131400   -9.2700 -137.1800      28.4        65       110        60
OIR    2025130    131400   -9.2700 -137.1900      28.2        65       108        60
OIR    2025130    131400   -9.2700 -137.2000      28.1        65       107        60
OIR    2025130    131400   -9.2700 -137.2100      28.0        65       107        60
OIR    2025130    131400   -9.2700 -137.2200      27.9        65       107        60
OIR    2025130    131400   -9.2700 -137.2300      27.8        65       107        60
OIR    2025130    131400   -9.2700 -137.2400      27.5        65       107        60
OIR    2025130    131400   -9.2700 -137.2500      27.1        65       104        60
OIR    2025130    131400   -9.2700 -137.2600      26.7        64       104        60
OIR    2025130    131400   -9.2700 -137.2700      26.4        64       104        60
OIR    2025130    131400   -9.2700 -137.2800      26.4        63       105        60
OIR    2025130    131400   -9.2700 -137.2900      26.3        63       104        60
OIR    2025130    131400   -9.2700 -137.3000      26.1        62       104        60
OIR    2025130    131400   -9.2700 -137.3100      25.2        62       103        60
OIR    2025130    131400   -9.2700 -137.3200      23.0        61       103        60
OIR    2025130    131400   -9.2700 -137.3300      20.7        61       103        60
OIR    2025130    131400   -9.2700 -137.3400      19.6        60       103        60
OIR    2025130    131400   -9.2700 -137.3500      19.3        60       103        60
OIR    2025130    131400   -9.2700 -137.3600      19.1        60       103        60
OIR    2025130    131400   -9.2700 -137.3700      19.0        61       103        60
OIR    2025130    131400   -9.2700 -137.3800      18.8        61       103        60
OIR    2025130    131400   -9.2700 -137.3900      18.6        61       103        60
OIR    2025130    131400   -9.2700 -137.4000      18.5        61       103        60
OIR    2025130    131400   -9.2700 -137.4100      18.1        61       103        60
OIR    2025130    131400   -9.2700 -137.4200      17.4        61       103        60
OIR    2025130    131400   -9.2700 -137.4300      16.2        61       103        60
OIR    2025130    131400   -9.2700 -137.4400      14.7        59       103        60
OIR    2025130    131400   -9.2700 -137.4500      12.5        54       103        60
OIR    2025130    131400   -9.2700 -137.4600       9.0        43       103        60
OIR    2025130    131400   -9.2700 -137.4700       7.9        35       104        60
OIR    2025130    131400   -9.2700 -137.4800       7.2        28       104        60
OIR    2025130    131400   -9.2700 -137.4900       6.3        15       105        60
OIR    2025130    131400   -9.2700 -137.5000       5.9         5       107        60
OIR    2025130    131400   -9.2700 -137.5100       6.1       359       108        60
OIR    2025130    131400   -9.2700 -137.5200       6.5       353       110        60
OIR    2025130    131400   -9.2700 -137.5300       7.0       350       111        60
OIR    2025130    131400   -9.2700 -137.5400       7.1       346       111        60
OIR    2025130    131400   -9.2700 -137.5500       7.3       343       110        60
OIR    2025130    131400   -9.2700 -137.5600       7.6       342       111        60
OIR    2025130    131400   -9.2700 -137.5700       7.9       343       111        60
OIR    2025130    131400   -9.2700 -137.5800       8.2       344       113        60
OIR    2025130    131400   -9.2700 -137.5900       8.5       346       114        60
OIR    2025130    131400   -9.2700 -137.6000       8.6       347       115        60
OIR    2025130    131400   -9.2700 -137.6100       8.8       348       115        60
OIR    2025130    131400   -9.2700 -137.6200       8.9       348       116        60
OIR    2025130    131400   -9.2700 -137.6300       8.8       346       116        60
OIR    2025130    131400   -9.2700 -137.6400       8.2       344       119        60
OIR    2025130    131400   -9.2700 -137.6500       7.2       340       121        60
OIR    2025130    131400   -9.2700 -137.6600       5.8       330       122        60
OIR    2025130    131400   -9.2700 -137.6700       5.2       322       123        60
OIR    2025130    131400   -9.2700 -137.6800       4.9       314       124        60
OIR    2025130    131400   -9.2700 -137.6900       5.0       303       124        60
OIR    2025130    131400   -9.2700 -137.7000       5.2       294       123        60
OIR    2025130    131400   -9.2700 -137.7100       5.5       289       122        60
OIR    2025130    131400   -9.2700 -137.7200       5.6       287       123        60
OIR    2025130    131400   -9.2700 -137.7300       5.7       286       123        60
OIR    2025130    131400   -9.2700 -137.7400       5.8       285       124        60
OIR    2025130    131400   -9.2700 -137.7500       5.8       285       127        60
OIR    2025130    131400   -9.2700 -137.7600       5.8       284       127        60
OIR    2025130    131400   -9.2700 -137.7700       5.8       284       126        60
OIR    2025130    131400   -9.2700 -137.7800       5.8       284       126        60
OIR    2025130    131400   -9.2700 -137.7900       5.8       284       125        60
OIR    2025130    131400   -9.2700 -137.8000       5.8       284       124        60
OIR    2025130    131400   -9.2700 -137.8100       5.8       284       123        60
OIR    2025130    131400   -9.2700 -137.8200       5.8       284       123        60
OIR    2025130    131400   -9.2700 -137.8300       5.8       283       123        60
OIR    2025130    131400   -9.2700 -137.8400       5.8       283       124        60
OIR    2025130    131400   -9.2700 -137.8500       5.8       282       126        60
OIR    2025130    131400   -9.2700 -137.8600       5.8       281       128        60
OIR    2025130    131400   -9.2700 -137.8700       5.8       279       129        60
OIR    2025130    131400   -9.2700 -137.8800       5.8       277       130        60
OIR    2025130    131400   -9.2700 -137.8900       5.8       274       130        60
OIR    2025130    131400   -9.2700 -137.9000       5.8       274       130        60
OIR    2025130    131400   -9.2700 -137.9100       5.8       273       126        60
OIR    2025130    131400   -9.2700 -137.9200       5.8       273       125        60
OIR    2025130    131400   -9.2700 -137.9300       5.9       272       128        60
OIR    2025130    131400   -9.2700 -137.9400       5.9       272       132        60
OIR    2025130    131400   -9.2700 -137.9500       6.0       272       135        60
OIR    2025130    131400   -9.2700 -137.9600       6.4       272       139        60
OIR    2025130    131400   -9.2700 -137.9700       7.6       273       142        60
OIR    2025130    131400   -9.2700 -137.9800       8.1       274       142        60
OIR    2025130    131400   -9.2700 -137.9900       8.3       275       143        60
OIR    2025130    131400   -9.2700 -138.0000       8.5       275       144        60
OIR    2025130    131400   -9.2700 -138.0100       8.5       275       145        60
OIR    2025130    131400   -9.2700 -138.0200       8.6       275       147        60
OIR    2025130    131400   -9.2700 -138.2600      30.0        34       110        60
OIR    2025130    131400   -9.2700 -138.2700      27.9        28       103        60
OIR    2025130    131400   -9.2700 -138.2800      26.8        20       103        60
OIR    2025130    131400   -9.2700 -138.2900      26.6        17       103        60
OIR    2025130    131400   -9.2700 -138.3000      27.0        16       103        60
OIR    2025130    131400   -9.2700 -138.3100      28.3        16       103        60
OIR    2025130    131400   -9.2700 -138.3200      28.9        16       103        60
OIR    2025130    131400   -9.2700 -138.3300      29.5        16       103        60
OIR    2025130    131400   -9.2700 -138.3400      29.7        15       103        60
OIR    2025130    131400   -9.2700 -138.3500      29.0        10       103        60
OIR    2025130    131400   -9.2700 -138.3600      28.9         3       103        60
OIR    2025130    131400   -9.2700 -138.3700      29.0         1       103        60
OIR    2025130    131400   -9.2700 -138.3800      29.0       360       103        60
OIR    2025130    131400   -9.2700 -138.3900      29.0       359       103        60
OIR    2025130    131400   -9.2700 -138.4000      29.1       359       103        60
OIR    2025130    131400   -9.2700 -138.4100      29.1       359       103        60
OIR    2025130    131400   -9.2700 -138.4200      29.1       358       103        60
OIR    2025130    131400   -9.2700 -138.4300      29.1       358       103        60
OIR    2025130    131400   -9.2700 -138.4400      29.1       358       103        60
OIR    2025130    131400   -9.2700 -138.4500      29.1       358       103        60
OIR    2025130    131400   -9.2700 -138.4600      29.1       357       103        60
OIR    2025130    131400   -9.2700 -138.4700      29.1       357       103        60
OIR    2025130    131400   -9.2700 -138.4800      29.1       357       103        60
OIR    2025130    131400   -9.2700 -138.4900      29.1       357       103        60
OIR    2025130    131400   -9.2700 -138.5000      29.1       357       103        60
OIR    2025130    131400   -9.2700 -138.5100      29.0       357       103        60
OIR    2025130    131400   -9.2700 -138.5200      28.9       357       103        60
OIR    2025130    131400   -9.2700 -138.5300      28.9       356       103        60
OIR    2025130    131400   -9.2700 -138.5400      28.8       356       103        60
OIR    2025130    131400   -9.2700 -138.5500      28.8       355       103        60
OIR    2025130    131400   -9.2700 -138.5600      28.7       355       103        60
OIR    2025130    131400   -9.2700 -138.5700      28.6       354       103        60
OIR    2025130    131400   -9.2700 -138.5800      28.4       354       103        60
OIR    2025130    131400   -9.2700 -138.5900      28.1       354       103        60
OIR    2025130    131400   -9.2700 -138.6000      27.9       353       103        60
OIR    2025130    131400   -9.2700 -138.6100      27.6       353       103        60
OIR    2025130    131400   -9.2700 -138.6200      27.4       352       103        60
OIR    2025130    131400   -9.2700 -138.6300      27.2       352       103        60
OIR    2025130    131400   -9.2700 -138.6400      27.1       351       103        60
OIR    2025130    131400   -9.2700 -138.6500      27.0       351       103        60
OIR    2025130    131400   -9.2700 -138.6600      26.8       350       103        60
OIR    2025130    131400   -9.2700 -138.6700      26.4       347       103        60
OIR    2025130    131400   -9.2700 -138.6800      25.9       344       103        60
OIR    2025130    131400   -9.2700 -138.6900      25.6       342       103        60
OIR    2025130    131400   -9.2700 -138.7000      25.2       340       103        60
OIR    2025130    131400   -9.2700 -138.7100      24.9       339       103        60
OIR    2025130    131400   -9.2700 -138.7200      24.5       337       103        60
OIR    2025130    131400   -9.2700 -138.7300      24.1       336       103        60
OIR    2025130    131400   -9.2700 -138.7400      23.8       334       103        60
OIR    2025130    131400   -9.2700 -138.7500      23.6       331       103        60
OIR    2025130    131400   -9.2700 -138.7600      23.5       329       104        60
OIR    2025130    131400   -9.2700 -138.7700      23.4       328       107        60
OIR    2025130    131400   -9.2700 -138.7800      23.3       327       110        60
OIR    2025130    131400   -9.2700 -138.7900      23.1       326       113        60
OIR    2025130    131400   -9.2700 -138.8000      22.8       326       116        60
OIR    2025130    131400   -9.2700 -138.8100      22.8       325       122        60
OIR    2025130    131400   -9.2700 -138.8200      22.7       324       120        60
OIR    2025130    131400   -9.2700 -138.8300      22.7       324       119        60
OIR    2025130    131400   -9.2700 -138.8400      22.7       324       119        60
OIR    2025130    131400   -9.2700 -138.8500      22.7       324       119        60
OIR    2025130    131400   -9.2700 -138.8600      22.7       324       123        60
OIR    2025130    131400   -9.2700 -138.8700      22.7       324       127        60
OIR    2025130    131400   -9.2700 -138.8800      22.7       324       129        60
OIR    2025130    131400   -9.2700 -138.8900      22.7       324       130        60
OIR    2025130    131400   -9.2700 -138.9000      22.7       324       131        60
OIR    2025130    131400   -9.2700 -138.9100      22.6       324       130        60
OIR    2025130    131400   -9.2700 -138.9200      22.1       324       130        60
OIR    2025130    131400   -9.2700 -138.9300      20.0       324       130        60
OIR    2025130    131400   -9.2700 -138.9400      18.1       324       132        60
OIR    2025130    131400   -9.2700 -138.9500      18.0       322       137        60
OIR    2025130    131400   -9.2700 -138.9600      17.8       320       142        60
OIR    2025130    131400   -9.2800 -136.3300      37.9        90       145        60
OIR    2025130    131400   -9.2800 -136.3400      37.8        89       146        60
OIR    2025130    131400   -9.2800 -136.3500      37.8        89       146        60
OIR    2025130    131400   -9.2800 -136.3600      37.7        89       145        60
OIR    2025130    131400   -9.2800 -136.4500      36.8        89       145        60
OIR    2025130    131400   -9.2800 -136.4600      36.7        90       143        60
OIR    2025130    131400   -9.2800 -136.4700      36.6        90       141        60
OIR    2025130    131400   -9.2800 -136.4800      36.4        89       139        60
OIR    2025130    131400   -9.2800 -136.4900      36.2        89       138        60
OIR    2025130    131400   -9.2800 -136.5000      35.7        89       136        60
OIR    2025130    131400   -9.2800 -136.5100      35.2        89       134        60
OIR    2025130    131400   -9.2800 -136.5200      34.8        89       132        60
OIR    2025130    131400   -9.2800 -136.5300      34.4        89       130        60
OIR    2025130    131400   -9.2800 -136.5400      33.9        89       130        60
OIR    2025130    131400   -9.2800 -136.5500      33.3        89       130        60
OIR    2025130    131400   -9.2800 -136.5600      32.7        88       130        60
OIR    2025130    131400   -9.2800 -136.5700      31.9        88       129        60
OIR    2025130    131400   -9.2800 -136.5800      30.8        87       128        60
OIR    2025130    131400   -9.2800 -136.5900      29.9        86       127        60
OIR    2025130    131400   -9.2800 -136.6000      28.7        84       127        60
OIR    2025130    131400   -9.2800 -136.6100      27.6        82       128        60
OIR    2025130    131400   -9.2800 -136.6200      27.1        81       129        60
OIR    2025130    131400   -9.2800 -136.6300      26.8        80       128        60
OIR    2025130    131400   -9.2800 -136.6400      26.6        79       127        60
OIR    2025130    131400   -9.2800 -136.6500      26.4        79       126        60
OIR    2025130    131400   -9.2800 -136.6600      26.3        78       126        60
OIR    2025130    131400   -9.2800 -136.6700      26.2        77       126        60
OIR    2025130    131400   -9.2800 -136.6800      26.2        77       125        60
OIR    2025130    131400   -9.2800 -136.6900      26.2        76       123        60
OIR    2025130    131400   -9.2800 -136.7000      26.2        76       123        60
OIR    2025130    131400   -9.2800 -136.7100      26.2        75       123        60
OIR    2025130    131400   -9.2800 -136.7200      26.1        75       124        60
OIR    2025130    131400   -9.2800 -136.7300      26.1        75       124        60
OIR    2025130    131400   -9.2800 -136.7400      26.1        75       124        60
OIR    2025130    131400   -9.2800 -136.7500      26.1        75       122        60
OIR    2025130    131400   -9.2800 -136.7600      26.1        75       120        60
OIR    2025130    131400   -9.2800 -136.7700      26.0        75       119        60
OIR    2025130    131400   -9.2800 -136.7800      26.0        75       120        60
OIR    2025130    131400   -9.2800 -136.7900      26.0        75       121        60
OIR    2025130    131400   -9.2800 -136.8000      25.9        75       124        60
OIR    2025130    131400   -9.2800 -136.8100      25.9        75       127        60
OIR    2025130    131400   -9.2800 -136.8200      25.6        74       128        60
OIR    2025130    131400   -9.2800 -136.8300      25.2        74       127        60
OIR    2025130    131400   -9.2800 -136.8400      25.2        75       125        60
OIR    2025130    131400   -9.2800 -136.8500      25.2        74       121        60
OIR    2025130    131400   -9.2800 -136.8600      25.2        75       119        60
OIR    2025130    131400   -9.2800 -136.8700      25.3        75       117        60
OIR    2025130    131400   -9.2800 -136.8800      25.4        75       117        60
OIR    2025130    131400   -9.2800 -136.8900      25.4        75       116        60
OIR    2025130    131400   -9.2800 -136.9000      25.5        75       116        60
OIR    2025130    131400   -9.2800 -136.9100      25.6        75       116        60
OIR    2025130    131400   -9.2800 -136.9200      25.6        75       116        60
OIR    2025130    131400   -9.2800 -136.9300      25.7        75       117        60
OIR    2025130    131400   -9.2800 -136.9400      25.8        75       116        60
OIR    2025130    131400   -9.2800 -136.9500      25.8        74       116        60
OIR    2025130    131400   -9.2800 -136.9600      25.8        74       116        60
OIR    2025130    131400   -9.2800 -136.9700      25.9        74       115        60
OIR    2025130    131400   -9.2800 -136.9800      26.0        73       115        60
OIR    2025130    131400   -9.2800 -136.9900      26.2        73       114        60
OIR    2025130    131400   -9.2800 -137.0000      26.5        72       112        60
OIR    2025130    131400   -9.2800 -137.0100      26.8        71       113        60
OIR    2025130    131400   -9.2800 -137.0200      26.9        70       114        60
OIR    2025130    131400   -9.2800 -137.0300      27.1        69       116        60
OIR    2025130    131400   -9.2800 -137.0400      27.2        68       116        60
OIR    2025130    131400   -9.2800 -137.0500      27.3        67       116        60
OIR    2025130    131400   -9.2800 -137.0600      27.2        65       116        60
OIR    2025130    131400   -9.2800 -137.0700      27.2        64       119        60
OIR    2025130    131400   -9.2800 -137.0800      27.4        64       119        60
OIR    2025130    131400   -9.2800 -137.0900      27.6        64       115        60
OIR    2025130    131400   -9.2800 -137.1000      27.9        64       111        60
OIR    2025130    131400   -9.2800 -137.1100      28.0        64       107        60
OIR    2025130    131400   -9.2800 -137.1200      28.2        64       105        60
OIR    2025130    131400   -9.2800 -137.1300      28.6        65       107        60
OIR    2025130    131400   -9.2800 -137.1400      28.7        65       113        60
OIR    2025130    131400   -9.2800 -137.1500      28.7        65       116        60
OIR    2025130    131400   -9.2800 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.2800 -137.1700      28.7        65       114        60
OIR    2025130    131400   -9.2800 -137.1800      28.5        65       110        60
OIR    2025130    131400   -9.2800 -137.1900      28.3        65       108        60
OIR    2025130    131400   -9.2800 -137.2000      28.1        65       107        60
OIR    2025130    131400   -9.2800 -137.2100      28.0        65       107        60
OIR    2025130    131400   -9.2800 -137.2200      28.0        65       107        60
OIR    2025130    131400   -9.2800 -137.2300      27.9        65       107        60
OIR    2025130    131400   -9.2800 -137.2400      27.7        65       105        60
OIR    2025130    131400   -9.2800 -137.2500      27.4        65       104        60
OIR    2025130    131400   -9.2800 -137.2600      27.0        64       103        60
OIR    2025130    131400   -9.2800 -137.2700      26.9        64       104        60
OIR    2025130    131400   -9.2800 -137.2800      26.8        63       104        60
OIR    2025130    131400   -9.2800 -137.2900      26.8        63       104        60
OIR    2025130    131400   -9.2800 -137.3000      26.8        63       103        60
OIR    2025130    131400   -9.2800 -137.3100      26.5        63       103        60
OIR    2025130    131400   -9.2800 -137.3200      25.2        62       103        60
OIR    2025130    131400   -9.2800 -137.3300      22.4        61       103        60
OIR    2025130    131400   -9.2800 -137.3400      20.2        60       103        60
OIR    2025130    131400   -9.2800 -137.3500      19.4        60       103        60
OIR    2025130    131400   -9.2800 -137.3600      19.2        60       103        60
OIR    2025130    131400   -9.2800 -137.3700      19.1        60       103        60
OIR    2025130    131400   -9.2800 -137.3800      18.9        61       103        60
OIR    2025130    131400   -9.2800 -137.3900      18.6        61       103        60
OIR    2025130    131400   -9.2800 -137.4000      18.4        61       103        60
OIR    2025130    131400   -9.2800 -137.4100      17.7        61       103        60
OIR    2025130    131400   -9.2800 -137.4200      16.5        61       103        60
OIR    2025130    131400   -9.2800 -137.4300      15.1        60       103        60
OIR    2025130    131400   -9.2800 -137.4400      13.4        59       103        60
OIR    2025130    131400   -9.2800 -137.4500      11.3        54       103        60
OIR    2025130    131400   -9.2800 -137.4600       8.7        44       103        60
OIR    2025130    131400   -9.2800 -137.4700       7.3        31       104        60
OIR    2025130    131400   -9.2800 -137.4800       6.7        21       104        60
OIR    2025130    131400   -9.2800 -137.4900       6.3         4       105        60
OIR    2025130    131400   -9.2800 -137.5000       6.1       357       107        60
OIR    2025130    131400   -9.2800 -137.5100       6.2       352       107        60
OIR    2025130    131400   -9.2800 -137.5200       6.4       349       108        60
OIR    2025130    131400   -9.2800 -137.5300       6.6       346       110        60
OIR    2025130    131400   -9.2800 -137.5400       6.7       342       110        60
OIR    2025130    131400   -9.2800 -137.5500       6.7       338       110        60
OIR    2025130    131400   -9.2800 -137.5600       6.7       337       109        60
OIR    2025130    131400   -9.2800 -137.5700       6.8       337       108        60
OIR    2025130    131400   -9.2800 -137.5800       7.0       338       112        60
OIR    2025130    131400   -9.2800 -137.5900       7.0       339       114        60
OIR    2025130    131400   -9.2800 -137.6000       6.9       339       115        60
OIR    2025130    131400   -9.2800 -137.6100       6.8       339       114        60
OIR    2025130    131400   -9.2800 -137.6200       6.7       339       114        60
OIR    2025130    131400   -9.2800 -137.6300       6.3       337       116        60
OIR    2025130    131400   -9.2800 -137.6400       5.6       330       119        60
OIR    2025130    131400   -9.2800 -137.6500       5.0       321       121        60
OIR    2025130    131400   -9.2800 -137.6600       4.6       312       122        60
OIR    2025130    131400   -9.2800 -137.6700       4.6       307       123        60
OIR    2025130    131400   -9.2800 -137.6800       4.8       301       124        60
OIR    2025130    131400   -9.2800 -137.6900       5.1       295       122        60
OIR    2025130    131400   -9.2800 -137.7000       5.4       289       121        60
OIR    2025130    131400   -9.2800 -137.7100       5.6       287       120        60
OIR    2025130    131400   -9.2800 -137.7200       5.7       286       120        60
OIR    2025130    131400   -9.2800 -137.7300       5.8       285       121        60
OIR    2025130    131400   -9.2800 -137.7400       5.8       285       123        60
OIR    2025130    131400   -9.2800 -137.7500       5.8       284       126        60
OIR    2025130    131400   -9.2800 -137.7600       5.8       284       125        60
OIR    2025130    131400   -9.2800 -137.7700       5.8       284       125        60
OIR    2025130    131400   -9.2800 -137.7800       5.8       284       126        60
OIR    2025130    131400   -9.2800 -137.7900       5.8       284       127        60
OIR    2025130    131400   -9.2800 -137.8000       5.8       284       124        60
OIR    2025130    131400   -9.2800 -137.8100       5.8       284       122        60
OIR    2025130    131400   -9.2800 -137.8200       5.8       284       120        60
OIR    2025130    131400   -9.2800 -137.8300       5.8       283       121        60
OIR    2025130    131400   -9.2800 -137.8400       5.8       283       121        60
OIR    2025130    131400   -9.2800 -137.8500       5.8       282       123        60
OIR    2025130    131400   -9.2800 -137.8600       5.8       281       126        60
OIR    2025130    131400   -9.2800 -137.8700       5.8       280       126        60
OIR    2025130    131400   -9.2800 -137.8800       5.8       277       127        60
OIR    2025130    131400   -9.2800 -137.8900       5.8       275       128        60
OIR    2025130    131400   -9.2800 -137.9000       5.8       274       130        60
OIR    2025130    131400   -9.2800 -137.9100       5.8       273       127        60
OIR    2025130    131400   -9.2800 -137.9200       5.9       273       127        60
OIR    2025130    131400   -9.2800 -137.9300       5.9       272       131        60
OIR    2025130    131400   -9.2800 -137.9400       6.0       272       134        60
OIR    2025130    131400   -9.2800 -137.9500       6.2       272       136        60
OIR    2025130    131400   -9.2800 -137.9600       6.7       273       139        60
OIR    2025130    131400   -9.2800 -137.9700       7.7       274       141        60
OIR    2025130    131400   -9.2800 -137.9800       8.2       275       139        60
OIR    2025130    131400   -9.2800 -137.9900       8.4       275       139        60
OIR    2025130    131400   -9.2800 -138.0000       8.5       275       141        60
OIR    2025130    131400   -9.2800 -138.0100       8.5       275       143        60
OIR    2025130    131400   -9.2800 -138.0200       8.5       275       144        60
OIR    2025130    131400   -9.2800 -138.0300       8.6       275       147        60
OIR    2025130    131400   -9.2800 -138.2600      29.5        31       112        60
OIR    2025130    131400   -9.2800 -138.2700      28.5        27       104        60
OIR    2025130    131400   -9.2800 -138.2800      26.8        19       103        60
OIR    2025130    131400   -9.2800 -138.2900      27.1        17       103        60
OIR    2025130    131400   -9.2800 -138.3000      27.4        17       103        60
OIR    2025130    131400   -9.2800 -138.3100      28.4        16       103        60
OIR    2025130    131400   -9.2800 -138.3200      29.0        16       103        60
OIR    2025130    131400   -9.2800 -138.3300      29.5        16       103        60
OIR    2025130    131400   -9.2800 -138.3400      29.7        16       103        60
OIR    2025130    131400   -9.2800 -138.3500      29.6        14       103        60
OIR    2025130    131400   -9.2800 -138.3600      29.1         2       103        60
OIR    2025130    131400   -9.2800 -138.3700      29.2         0       103        60
OIR    2025130    131400   -9.2800 -138.3800      29.2       360       103        60
OIR    2025130    131400   -9.2800 -138.3900      29.2       359       103        60
OIR    2025130    131400   -9.2800 -138.4000      29.2       359       103        60
OIR    2025130    131400   -9.2800 -138.4100      29.2       359       103        60
OIR    2025130    131400   -9.2800 -138.4200      29.2       358       103        60
OIR    2025130    131400   -9.2800 -138.4300      29.2       358       103        60
OIR    2025130    131400   -9.2800 -138.4400      29.2       358       103        60
OIR    2025130    131400   -9.2800 -138.4500      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.4600      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.4700      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.4800      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.4900      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.5000      29.2       357       103        60
OIR    2025130    131400   -9.2800 -138.5100      29.2       356       103        60
OIR    2025130    131400   -9.2800 -138.5200      29.1       356       103        60
OIR    2025130    131400   -9.2800 -138.5300      29.1       356       103        60
OIR    2025130    131400   -9.2800 -138.5400      29.1       356       103        60
OIR    2025130    131400   -9.2800 -138.5500      29.0       355       103        60
OIR    2025130    131400   -9.2800 -138.5600      28.9       355       103        60
OIR    2025130    131400   -9.2800 -138.5700      28.8       354       103        60
OIR    2025130    131400   -9.2800 -138.5800      28.6       354       103        60
OIR    2025130    131400   -9.2800 -138.5900      28.4       353       103        60
OIR    2025130    131400   -9.2800 -138.6000      28.1       353       103        60
OIR    2025130    131400   -9.2800 -138.6100      27.7       352       103        60
OIR    2025130    131400   -9.2800 -138.6200      27.5       352       103        60
OIR    2025130    131400   -9.2800 -138.6300      27.4       351       103        60
OIR    2025130    131400   -9.2800 -138.6400      27.2       351       103        60
OIR    2025130    131400   -9.2800 -138.6500      27.1       350       103        60
OIR    2025130    131400   -9.2800 -138.6600      26.8       349       103        60
OIR    2025130    131400   -9.2800 -138.6700      26.6       345       103        60
OIR    2025130    131400   -9.2800 -138.6800      26.3       343       103        60
OIR    2025130    131400   -9.2800 -138.6900      26.0       341       103        60
OIR    2025130    131400   -9.2800 -138.7000      25.7       339       103        60
OIR    2025130    131400   -9.2800 -138.7100      25.3       338       103        60
OIR    2025130    131400   -9.2800 -138.7200      25.0       336       103        60
OIR    2025130    131400   -9.2800 -138.7300      24.6       334       103        60
OIR    2025130    131400   -9.2800 -138.7400      24.3       332       103        60
OIR    2025130    131400   -9.2800 -138.7500      24.2       330       103        60
OIR    2025130    131400   -9.2800 -138.7600      24.0       328       104        60
OIR    2025130    131400   -9.2800 -138.7700      24.0       328       107        60
OIR    2025130    131400   -9.2800 -138.7800      23.8       327       110        60
OIR    2025130    131400   -9.2800 -138.7900      23.7       326       113        60
OIR    2025130    131400   -9.2800 -138.8000      23.3       326       116        60
OIR    2025130    131400   -9.2800 -138.8100      23.0       325       120        60
OIR    2025130    131400   -9.2800 -138.8200      22.8       324       119        60
OIR    2025130    131400   -9.2800 -138.8300      22.8       324       119        60
OIR    2025130    131400   -9.2800 -138.8400      22.7       324       117        60
OIR    2025130    131400   -9.2800 -138.8500      22.7       324       117        60
OIR    2025130    131400   -9.2800 -138.8600      22.7       324       122        60
OIR    2025130    131400   -9.2800 -138.8700      22.7       324       125        60
OIR    2025130    131400   -9.2800 -138.8800      22.7       324       125        60
OIR    2025130    131400   -9.2800 -138.8900      22.7       324       127        60
OIR    2025130    131400   -9.2800 -138.9000      22.7       324       128        60
OIR    2025130    131400   -9.2800 -138.9100      22.6       324       128        60
OIR    2025130    131400   -9.2800 -138.9200      22.1       324       127        60
OIR    2025130    131400   -9.2800 -138.9300      19.9       324       126        60
OIR    2025130    131400   -9.2800 -138.9400      18.0       326       127        60
OIR    2025130    131400   -9.2800 -138.9500      18.1       322       131        60
OIR    2025130    131400   -9.2800 -138.9600      17.9       320       136        60
OIR    2025130    131400   -9.2800 -138.9700      17.7       316       146        60
OIR    2025130    131400   -9.2900 -136.3500      37.6        89       146        60
OIR    2025130    131400   -9.2900 -136.3600      37.6        89       143        60
OIR    2025130    131400   -9.2900 -136.4500      36.7        89       145        60
OIR    2025130    131400   -9.2900 -136.4600      36.7        89       143        60
OIR    2025130    131400   -9.2900 -136.4700      36.6        89       142        60
OIR    2025130    131400   -9.2900 -136.4800      36.5        89       139        60
OIR    2025130    131400   -9.2900 -136.4900      36.2        89       137        60
OIR    2025130    131400   -9.2900 -136.5000      35.8        88       135        60
OIR    2025130    131400   -9.2900 -136.5100      35.3        88       134        60
OIR    2025130    131400   -9.2900 -136.5200      35.0        88       132        60
OIR    2025130    131400   -9.2900 -136.5300      34.6        88       131        60
OIR    2025130    131400   -9.2900 -136.5400      34.1        88       130        60
OIR    2025130    131400   -9.2900 -136.5500      33.4        88       130        60
OIR    2025130    131400   -9.2900 -136.5600      32.8        87       130        60
OIR    2025130    131400   -9.2900 -136.5700      32.0        87       129        60
OIR    2025130    131400   -9.2900 -136.5800      30.8        86       127        60
OIR    2025130    131400   -9.2900 -136.5900      29.7        85       127        60
OIR    2025130    131400   -9.2900 -136.6000      28.4        83       127        60
OIR    2025130    131400   -9.2900 -136.6100      27.5        81       128        60
OIR    2025130    131400   -9.2900 -136.6200      27.0        80       128        60
OIR    2025130    131400   -9.2900 -136.6300      26.7        79       127        60
OIR    2025130    131400   -9.2900 -136.6400      26.5        78       126        60
OIR    2025130    131400   -9.2900 -136.6500      26.3        78       125        60
OIR    2025130    131400   -9.2900 -136.6600      26.2        77       125        60
OIR    2025130    131400   -9.2900 -136.6700      26.2        77       125        60
OIR    2025130    131400   -9.2900 -136.6800      26.2        76       124        60
OIR    2025130    131400   -9.2900 -136.6900      26.2        76       123        60
OIR    2025130    131400   -9.2900 -136.7000      26.2        75       123        60
OIR    2025130    131400   -9.2900 -136.7100      26.2        75       122        60
OIR    2025130    131400   -9.2900 -136.7200      26.1        75       123        60
OIR    2025130    131400   -9.2900 -136.7300      26.1        75       123        60
OIR    2025130    131400   -9.2900 -136.7400      26.1        75       123        60
OIR    2025130    131400   -9.2900 -136.7500      26.1        75       121        60
OIR    2025130    131400   -9.2900 -136.7600      26.1        75       117        60
OIR    2025130    131400   -9.2900 -136.7700      26.0        75       117        60
OIR    2025130    131400   -9.2900 -136.7800      26.0        75       119        60
OIR    2025130    131400   -9.2900 -136.7900      26.0        75       120        60
OIR    2025130    131400   -9.2900 -136.8000      25.9        75       123        60
OIR    2025130    131400   -9.2900 -136.8100      25.9        75       126        60
OIR    2025130    131400   -9.2900 -136.8200      25.8        75       127        60
OIR    2025130    131400   -9.2900 -136.8300      25.3        74       126        60
OIR    2025130    131400   -9.2900 -136.8400      25.2        74       124        60
OIR    2025130    131400   -9.2900 -136.8500      25.2        74       121        60
OIR    2025130    131400   -9.2900 -136.8600      25.3        74       119        60
OIR    2025130    131400   -9.2900 -136.8700      25.4        74       119        60
OIR    2025130    131400   -9.2900 -136.8800      25.4        74       117        60
OIR    2025130    131400   -9.2900 -136.8900      25.5        74       116        60
OIR    2025130    131400   -9.2900 -136.9000      25.6        74       116        60
OIR    2025130    131400   -9.2900 -136.9100      25.6        74       116        60
OIR    2025130    131400   -9.2900 -136.9200      25.7        74       116        60
OIR    2025130    131400   -9.2900 -136.9300      25.8        74       117        60
OIR    2025130    131400   -9.2900 -136.9400      25.9        74       116        60
OIR    2025130    131400   -9.2900 -136.9500      26.0        74       116        60
OIR    2025130    131400   -9.2900 -136.9600      26.1        73       115        60
OIR    2025130    131400   -9.2900 -136.9700      26.4        72       114        60
OIR    2025130    131400   -9.2900 -136.9800      26.5        72       114        60
OIR    2025130    131400   -9.2900 -136.9900      26.7        71       113        60
OIR    2025130    131400   -9.2900 -137.0000      26.9        71       113        60
OIR    2025130    131400   -9.2900 -137.0100      27.1        70       114        60
OIR    2025130    131400   -9.2900 -137.0200      27.3        69       115        60
OIR    2025130    131400   -9.2900 -137.0300      27.5        68       116        60
OIR    2025130    131400   -9.2900 -137.0400      27.6        67       116        60
OIR    2025130    131400   -9.2900 -137.0500      27.7        66       116        60
OIR    2025130    131400   -9.2900 -137.0600      27.6        65       116        60
OIR    2025130    131400   -9.2900 -137.0700      27.5        64       117        60
OIR    2025130    131400   -9.2900 -137.0800      27.7        64       116        60
OIR    2025130    131400   -9.2900 -137.0900      27.8        64       112        60
OIR    2025130    131400   -9.2900 -137.1000      28.0        64       108        60
OIR    2025130    131400   -9.2900 -137.1100      28.2        64       104        60
OIR    2025130    131400   -9.2900 -137.1200      28.4        65       104        60
OIR    2025130    131400   -9.2900 -137.1300      28.7        65       104        60
OIR    2025130    131400   -9.2900 -137.1400      28.7        65       111        60
OIR    2025130    131400   -9.2900 -137.1500      28.7        65       115        60
OIR    2025130    131400   -9.2900 -137.1600      28.7        65       114        60
OIR    2025130    131400   -9.2900 -137.1700      28.7        65       113        60
OIR    2025130    131400   -9.2900 -137.1800      28.6        65       110        60
OIR    2025130    131400   -9.2900 -137.1900      28.3        65       109        60
OIR    2025130    131400   -9.2900 -137.2000      28.1        65       108        60
OIR    2025130    131400   -9.2900 -137.2100      28.0        65       107        60
OIR    2025130    131400   -9.2900 -137.2200      28.0        65       108        60
OIR    2025130    131400   -9.2900 -137.2300      27.9        65       107        60
OIR    2025130    131400   -9.2900 -137.2400      27.8        65       105        60
OIR    2025130    131400   -9.2900 -137.2500      27.5        64       104        60
OIR    2025130    131400   -9.2900 -137.2600      27.2        64       103        60
OIR    2025130    131400   -9.2900 -137.2700      27.0        64       103        60
OIR    2025130    131400   -9.2900 -137.2800      27.0        63       103        60
OIR    2025130    131400   -9.2900 -137.2900      27.0        63       103        60
OIR    2025130    131400   -9.2900 -137.3000      27.0        63       103        60
OIR    2025130    131400   -9.2900 -137.3100      26.9        63       103        60
OIR    2025130    131400   -9.2900 -137.3200      26.5        63       103        60
OIR    2025130    131400   -9.2900 -137.3300      24.7        62       103        60
OIR    2025130    131400   -9.2900 -137.3400      21.8        60       103        60
OIR    2025130    131400   -9.2900 -137.3500      20.3        59       103        60
OIR    2025130    131400   -9.2900 -137.3600      19.5        60       103        60
OIR    2025130    131400   -9.2900 -137.3700      19.1        60       103        60
OIR    2025130    131400   -9.2900 -137.3800      18.9        60       103        60
OIR    2025130    131400   -9.2900 -137.3900      18.6        60       103        60
OIR    2025130    131400   -9.2900 -137.4000      18.1        60       103        60
OIR    2025130    131400   -9.2900 -137.4100      17.0        60       103        60
OIR    2025130    131400   -9.2900 -137.4200      15.6        60       103        60
OIR    2025130    131400   -9.2900 -137.4300      14.1        60       103        60
OIR    2025130    131400   -9.2900 -137.4400      12.1        58       103        60
OIR    2025130    131400   -9.2900 -137.4500       9.8        55       103        60
OIR    2025130    131400   -9.2900 -137.4600       7.5        45       104        60
OIR    2025130    131400   -9.2900 -137.4700       6.0        25       104        60
OIR    2025130    131400   -9.2900 -137.4800       5.7         7       105        60
OIR    2025130    131400   -9.2900 -137.4900       5.7       354       108        60
OIR    2025130    131400   -9.2900 -137.5000       5.8       349       110        60
OIR    2025130    131400   -9.2900 -137.5100       5.9       345       112        60
OIR    2025130    131400   -9.2900 -137.5200       6.1       342       114        60
OIR    2025130    131400   -9.2900 -137.5300       6.3       340       115        60
OIR    2025130    131400   -9.2900 -137.5400       6.4       338       113        60
OIR    2025130    131400   -9.2900 -137.5500       6.5       337       111        60
OIR    2025130    131400   -9.2900 -137.5600       6.5       336       110        60
OIR    2025130    131400   -9.2900 -137.5700       6.5       335       109        60
OIR    2025130    131400   -9.2900 -137.5800       6.5       335       111        60
OIR    2025130    131400   -9.2900 -137.5900       6.2       335       113        60
OIR    2025130    131400   -9.2900 -137.6000       6.0       333       115        60
OIR    2025130    131400   -9.2900 -137.6100       5.6       331       115        60
OIR    2025130    131400   -9.2900 -137.6200       5.0       326       116        60
OIR    2025130    131400   -9.2900 -137.6300       4.6       320       117        60
OIR    2025130    131400   -9.2900 -137.6400       4.4       314       120        60
OIR    2025130    131400   -9.2900 -137.6500       4.4       309       122        60
OIR    2025130    131400   -9.2900 -137.6600       4.4       305       123        60
OIR    2025130    131400   -9.2900 -137.6700       4.5       300       123        60
OIR    2025130    131400   -9.2900 -137.6800       4.9       295       124        60
OIR    2025130    131400   -9.2900 -137.6900       5.2       290       123        60
OIR    2025130    131400   -9.2900 -137.7000       5.6       287       122        60
OIR    2025130    131400   -9.2900 -137.7100       5.7       285       121        60
OIR    2025130    131400   -9.2900 -137.7200       5.7       285       121        60
OIR    2025130    131400   -9.2900 -137.7300       5.8       284       123        60
OIR    2025130    131400   -9.2900 -137.7400       5.8       284       124        60
OIR    2025130    131400   -9.2900 -137.7500       5.8       284       127        60
OIR    2025130    131400   -9.2900 -137.7600       5.8       284       125        60
OIR    2025130    131400   -9.2900 -137.7700       5.8       284       125        60
OIR    2025130    131400   -9.2900 -137.7800       5.9       284       125        60
OIR    2025130    131400   -9.2900 -137.7900       5.9       284       126        60
OIR    2025130    131400   -9.2900 -137.8000       5.9       284       124        60
OIR    2025130    131400   -9.2900 -137.8100       5.9       284       122        60
OIR    2025130    131400   -9.2900 -137.8200       5.9       283       120        60
OIR    2025130    131400   -9.2900 -137.8300       5.9       283       120        60
OIR    2025130    131400   -9.2900 -137.8400       5.9       283       121        60
OIR    2025130    131400   -9.2900 -137.8500       5.9       282       122        60
OIR    2025130    131400   -9.2900 -137.8600       5.9       281       124        60
OIR    2025130    131400   -9.2900 -137.8700       5.9       280       124        60
OIR    2025130    131400   -9.2900 -137.8800       5.8       279       125        60
OIR    2025130    131400   -9.2900 -137.8900       5.8       276       128        60
OIR    2025130    131400   -9.2900 -137.9000       5.8       274       130        60
OIR    2025130    131400   -9.2900 -137.9100       5.9       273       129        60
OIR    2025130    131400   -9.2900 -137.9200       5.9       273       129        60
OIR    2025130    131400   -9.2900 -137.9300       6.0       272       131        60
OIR    2025130    131400   -9.2900 -137.9400       6.2       272       133        60
OIR    2025130    131400   -9.2900 -137.9500       6.5       273       136        60
OIR    2025130    131400   -9.2900 -137.9600       7.1       273       137        60
OIR    2025130    131400   -9.2900 -137.9700       7.9       274       139        60
OIR    2025130    131400   -9.2900 -137.9800       8.3       275       138        60
OIR    2025130    131400   -9.2900 -137.9900       8.5       275       137        60
OIR    2025130    131400   -9.2900 -138.0000       8.5       275       139        60
OIR    2025130    131400   -9.2900 -138.0100       8.5       275       140        60
OIR    2025130    131400   -9.2900 -138.0200       8.5       275       142        60
OIR    2025130    131400   -9.2900 -138.0300       8.6       275       145        60
OIR    2025130    131400   -9.2900 -138.0400       8.5       276       149        60
OIR    2025130    131400   -9.2900 -138.2600      28.2        26       139        60
OIR    2025130    131400   -9.2900 -138.2700      27.0        21       129        60
OIR    2025130    131400   -9.2900 -138.2800      27.0        18       123        60
OIR    2025130    131400   -9.2900 -138.2900      27.7        17       114        60
OIR    2025130    131400   -9.2900 -138.3000      28.2        17       103        60
OIR    2025130    131400   -9.2900 -138.3100      28.4        16       103        60
OIR    2025130    131400   -9.2900 -138.3200      28.9        16       103        60
OIR    2025130    131400   -9.2900 -138.3300      29.4        16       103        60
OIR    2025130    131400   -9.2900 -138.3400      29.6        16       103        60
OIR    2025130    131400   -9.2900 -138.3500      29.5        14       103        60
OIR    2025130    131400   -9.2900 -138.3600      29.2         1       103        60
OIR    2025130    131400   -9.2900 -138.3700      29.3       360       103        60
OIR    2025130    131400   -9.2900 -138.3800      29.3       359       103        60
OIR    2025130    131400   -9.2900 -138.3900      29.3       359       103        60
OIR    2025130    131400   -9.2900 -138.4000      29.3       359       103        60
OIR    2025130    131400   -9.2900 -138.4100      29.4       358       103        60
OIR    2025130    131400   -9.2900 -138.4200      29.4       358       103        60
OIR    2025130    131400   -9.2900 -138.4300      29.4       358       103        60
OIR    2025130    131400   -9.2900 -138.4400      29.4       358       103        60
OIR    2025130    131400   -9.2900 -138.4500      29.4       357       103        60
OIR    2025130    131400   -9.2900 -138.4600      29.3       357       103        60
OIR    2025130    131400   -9.2900 -138.4700      29.3       357       103        60
OIR    2025130    131400   -9.2900 -138.4800      29.3       357       103        60
OIR    2025130    131400   -9.2900 -138.4900      29.3       357       103        60
OIR    2025130    131400   -9.2900 -138.5000      29.3       356       103        60
OIR    2025130    131400   -9.2900 -138.5100      29.3       356       103        60
OIR    2025130    131400   -9.2900 -138.5200      29.3       356       103        60
OIR    2025130    131400   -9.2900 -138.5300      29.3       356       103        60
OIR    2025130    131400   -9.2900 -138.5400      29.3       355       103        60
OIR    2025130    131400   -9.2900 -138.5500      29.2       355       103        60
OIR    2025130    131400   -9.2900 -138.5600      29.1       354       103        60
OIR    2025130    131400   -9.2900 -138.5700      29.0       354       103        60
OIR    2025130    131400   -9.2900 -138.5800      28.8       353       103        60
OIR    2025130    131400   -9.2900 -138.5900      28.6       353       103        60
OIR    2025130    131400   -9.2900 -138.6000      28.3       352       103        60
OIR    2025130    131400   -9.2900 -138.6100      28.0       352       103        60
OIR    2025130    131400   -9.2900 -138.6200      27.7       351       103        60
OIR    2025130    131400   -9.2900 -138.6300      27.6       351       103        60
OIR    2025130    131400   -9.2900 -138.6400      27.4       350       103        60
OIR    2025130    131400   -9.2900 -138.6500      27.2       349       103        60
OIR    2025130    131400   -9.2900 -138.6600      27.0       347       103        60
OIR    2025130    131400   -9.2900 -138.6700      26.9       344       103        60
OIR    2025130    131400   -9.2900 -138.6800      26.8       342       103        60
OIR    2025130    131400   -9.2900 -138.6900      26.6       340       103        60
OIR    2025130    131400   -9.2900 -138.7000      26.4       338       103        60
OIR    2025130    131400   -9.2900 -138.7100      26.0       337       103        60
OIR    2025130    131400   -9.2900 -138.7200      25.5       335       103        60
OIR    2025130    131400   -9.2900 -138.7300      25.0       333       103        60
OIR    2025130    131400   -9.2900 -138.7400      24.6       331       103        60
OIR    2025130    131400   -9.2900 -138.7500      24.4       329       103        60
OIR    2025130    131400   -9.2900 -138.7600      24.3       328       104        60
OIR    2025130    131400   -9.2900 -138.7700      24.2       328       104        60
OIR    2025130    131400   -9.2900 -138.7800      24.2       327       108        60
OIR    2025130    131400   -9.2900 -138.7900      24.0       327       111        60
OIR    2025130    131400   -9.2900 -138.8000      23.6       326       114        60
OIR    2025130    131400   -9.2900 -138.8100      23.3       326       116        60
OIR    2025130    131400   -9.2900 -138.8200      22.9       324       116        60
OIR    2025130    131400   -9.2900 -138.8300      22.8       324       116        60
OIR    2025130    131400   -9.2900 -138.8400      22.8       324       115        60
OIR    2025130    131400   -9.2900 -138.8500      22.8       324       114        60
OIR    2025130    131400   -9.2900 -138.8600      22.7       324       117        60
OIR    2025130    131400   -9.2900 -138.8700      22.7       324       121        60
OIR    2025130    131400   -9.2900 -138.8800      22.7       324       124        60
OIR    2025130    131400   -9.2900 -138.8900      22.7       324       125        60
OIR    2025130    131400   -9.2900 -138.9000      22.7       324       126        60
OIR    2025130    131400   -9.2900 -138.9100      22.7       324       126        60
OIR    2025130    131400   -9.2900 -138.9200      22.1       324       126        60
OIR    2025130    131400   -9.2900 -138.9300      19.3       327       127        60
OIR    2025130    131400   -9.2900 -138.9400      17.9       328       128        60
OIR    2025130    131400   -9.2900 -138.9500      18.0       320       132        60
OIR    2025130    131400   -9.2900 -138.9600      17.8       318       136        60
OIR    2025130    131400   -9.3000 -136.3500      37.4        89       145        60
OIR    2025130    131400   -9.3000 -136.3600      37.4        89       142        60
OIR    2025130    131400   -9.3000 -136.4300      36.4        86       145        60
OIR    2025130    131400   -9.3000 -136.4400      36.6        87       145        60
OIR    2025130    131400   -9.3000 -136.4500      36.6        88       146        60
OIR    2025130    131400   -9.3000 -136.4600      36.6        89       145        60
OIR    2025130    131400   -9.3000 -136.4700      36.6        89       144        60
OIR    2025130    131400   -9.3000 -136.4800      36.6        88       140        60
OIR    2025130    131400   -9.3000 -136.4900      36.4        88       137        60
OIR    2025130    131400   -9.3000 -136.5000      35.8        87       135        60
OIR    2025130    131400   -9.3000 -136.5100      35.5        87       133        60
OIR    2025130    131400   -9.3000 -136.5200      35.2        87       132        60
OIR    2025130    131400   -9.3000 -136.5300      34.8        87       131        60
OIR    2025130    131400   -9.3000 -136.5400      34.3        87       130        60
OIR    2025130    131400   -9.3000 -136.5500      33.5        87       130        60
OIR    2025130    131400   -9.3000 -136.5600      32.9        86       130        60
OIR    2025130    131400   -9.3000 -136.5700      32.0        86       129        60
OIR    2025130    131400   -9.3000 -136.5800      30.7        85       128        60
OIR    2025130    131400   -9.3000 -136.5900      29.4        84       127        60
OIR    2025130    131400   -9.3000 -136.6000      28.1        82       127        60
OIR    2025130    131400   -9.3000 -136.6100      27.3        80       128        60
OIR    2025130    131400   -9.3000 -136.6200      26.9        79       128        60
OIR    2025130    131400   -9.3000 -136.6300      26.6        78       128        60
OIR    2025130    131400   -9.3000 -136.6400      26.5        77       127        60
OIR    2025130    131400   -9.3000 -136.6500      26.3        77       125        60
OIR    2025130    131400   -9.3000 -136.6600      26.2        77       124        60
OIR    2025130    131400   -9.3000 -136.6700      26.2        76       123        60
OIR    2025130    131400   -9.3000 -136.6800      26.2        76       123        60
OIR    2025130    131400   -9.3000 -136.6900      26.2        75       123        60
OIR    2025130    131400   -9.3000 -136.7000      26.2        75       122        60
OIR    2025130    131400   -9.3000 -136.7100      26.2        75       122        60
OIR    2025130    131400   -9.3000 -136.7200      26.1        75       123        60
OIR    2025130    131400   -9.3000 -136.7300      26.1        75       123        60
OIR    2025130    131400   -9.3000 -136.7400      26.1        75       122        60
OIR    2025130    131400   -9.3000 -136.7500      26.1        75       120        60
OIR    2025130    131400   -9.3000 -136.7600      26.1        75       116        60
OIR    2025130    131400   -9.3000 -136.7700      26.0        75       116        60
OIR    2025130    131400   -9.3000 -136.7800      26.0        75       117        60
OIR    2025130    131400   -9.3000 -136.7900      26.0        75       119        60
OIR    2025130    131400   -9.3000 -136.8000      26.0        75       121        60
OIR    2025130    131400   -9.3000 -136.8100      25.9        75       124        60
OIR    2025130    131400   -9.3000 -136.8200      25.8        74       126        60
OIR    2025130    131400   -9.3000 -136.8300      25.4        74       125        60
OIR    2025130    131400   -9.3000 -136.8400      25.4        74       123        60
OIR    2025130    131400   -9.3000 -136.8500      25.4        74       121        60
OIR    2025130    131400   -9.3000 -136.8600      25.4        74       119        60
OIR    2025130    131400   -9.3000 -136.8700      25.4        74       119        60
OIR    2025130    131400   -9.3000 -136.8800      25.5        74       117        60
OIR    2025130    131400   -9.3000 -136.8900      25.5        74       116        60
OIR    2025130    131400   -9.3000 -136.9000      25.6        74       116        60
OIR    2025130    131400   -9.3000 -136.9100      25.8        74       116        60
OIR    2025130    131400   -9.3000 -136.9200      25.9        74       117        60
OIR    2025130    131400   -9.3000 -136.9300      26.1        74       117        60
OIR    2025130    131400   -9.3000 -136.9400      26.2        73       116        60
OIR    2025130    131400   -9.3000 -136.9500      26.4        73       114        60
OIR    2025130    131400   -9.3000 -136.9600      26.6        72       113        60
OIR    2025130    131400   -9.3000 -136.9700      26.7        72       112        60
OIR    2025130    131400   -9.3000 -136.9800      26.9        71       112        60
OIR    2025130    131400   -9.3000 -136.9900      27.1        70       113        60
OIR    2025130    131400   -9.3000 -137.0000      27.2        70       113        60
OIR    2025130    131400   -9.3000 -137.0100      27.4        69       114        60
OIR    2025130    131400   -9.3000 -137.0200      27.6        68       115        60
OIR    2025130    131400   -9.3000 -137.0300      27.8        67       116        60
OIR    2025130    131400   -9.3000 -137.0400      27.9        67       117        60
OIR    2025130    131400   -9.3000 -137.0500      27.9        66       116        60
OIR    2025130    131400   -9.3000 -137.0600      27.9        65       116        60
OIR    2025130    131400   -9.3000 -137.0700      27.8        65       116        60
OIR    2025130    131400   -9.3000 -137.0800      27.9        65       114        60
OIR    2025130    131400   -9.3000 -137.0900      28.0        64       110        60
OIR    2025130    131400   -9.3000 -137.1000      28.1        64       108        60
OIR    2025130    131400   -9.3000 -137.1100      28.3        65       107        60
OIR    2025130    131400   -9.3000 -137.1200      28.6        65       105        60
OIR    2025130    131400   -9.3000 -137.1300      28.7        65       104        60
OIR    2025130    131400   -9.3000 -137.1400      28.7        65       109        60
OIR    2025130    131400   -9.3000 -137.1500      28.7        65       112        60
OIR    2025130    131400   -9.3000 -137.1600      28.7        65       111        60
OIR    2025130    131400   -9.3000 -137.1700      28.7        65       111        60
OIR    2025130    131400   -9.3000 -137.1800      28.6        65       111        60
OIR    2025130    131400   -9.3000 -137.1900      28.4        65       111        60
OIR    2025130    131400   -9.3000 -137.2000      28.1        65       109        60
OIR    2025130    131400   -9.3000 -137.2100      28.1        65       109        60
OIR    2025130    131400   -9.3000 -137.2200      28.0        65       109        60
OIR    2025130    131400   -9.3000 -137.2300      28.0        65       108        60
OIR    2025130    131400   -9.3000 -137.2400      27.8        65       107        60
OIR    2025130    131400   -9.3000 -137.2500      27.5        64       104        60
OIR    2025130    131400   -9.3000 -137.2600      27.3        64       103        60
OIR    2025130    131400   -9.3000 -137.2700      27.2        64       103        60
OIR    2025130    131400   -9.3000 -137.2800      27.1        63       103        60
OIR    2025130    131400   -9.3000 -137.2900      27.1        63       103        60
OIR    2025130    131400   -9.3000 -137.3000      27.1        63       103        60
OIR    2025130    131400   -9.3000 -137.3100      27.1        63       103        60
OIR    2025130    131400   -9.3000 -137.3200      27.0        63       104        60
OIR    2025130    131400   -9.3000 -137.3300      26.2        63       104        60
OIR    2025130    131400   -9.3000 -137.3400      23.2        60       104        60
OIR    2025130    131400   -9.3000 -137.3500      21.7        59       103        60
OIR    2025130    131400   -9.3000 -137.3600      20.7        59       103        60
OIR    2025130    131400   -9.3000 -137.3700      19.6        59       103        60
OIR    2025130    131400   -9.3000 -137.3800      19.0        59       103        60
OIR    2025130    131400   -9.3000 -137.3900      18.4        59       103        60
OIR    2025130    131400   -9.3000 -137.4000      17.6        59       103        60
OIR    2025130    131400   -9.3000 -137.4100      16.3        59       103        60
OIR    2025130    131400   -9.3000 -137.4200      14.9        59       103        60
OIR    2025130    131400   -9.3000 -137.4300      13.4        59       103        60
OIR    2025130    131400   -9.3000 -137.4400      11.3        57       103        60
OIR    2025130    131400   -9.3000 -137.4500       8.6        53       104        60
OIR    2025130    131400   -9.3000 -137.4600       6.1        41       104        60
OIR    2025130    131400   -9.3000 -137.4700       4.8        13       104        60
OIR    2025130    131400   -9.3000 -137.4800       5.1       356       107        60
OIR    2025130    131400   -9.3000 -137.4900       5.4       349       110        60
OIR    2025130    131400   -9.3000 -137.5000       5.6       345       113        60
OIR    2025130    131400   -9.3000 -137.5100       5.8       340       116        60
OIR    2025130    131400   -9.3000 -137.5200       6.0       337       120        60
OIR    2025130    131400   -9.3000 -137.5300       6.1       337       121        60
OIR    2025130    131400   -9.3000 -137.5400       6.2       336       116        60
OIR    2025130    131400   -9.3000 -137.5500       6.3       335       112        60
OIR    2025130    131400   -9.3000 -137.5600       6.3       335       111        60
OIR    2025130    131400   -9.3000 -137.5700       6.2       333       110        60
OIR    2025130    131400   -9.3000 -137.5800       6.0       332       111        60
OIR    2025130    131400   -9.3000 -137.5900       5.7       330       112        60
OIR    2025130    131400   -9.3000 -137.6000       5.2       327       115        60
OIR    2025130    131400   -9.3000 -137.6100       4.6       321       116        60
OIR    2025130    131400   -9.3000 -137.6200       4.3       315       117        60
OIR    2025130    131400   -9.3000 -137.6300       4.1       310       120        60
OIR    2025130    131400   -9.3000 -137.6400       4.1       307       122        60
OIR    2025130    131400   -9.3000 -137.6500       4.2       304       123        60
OIR    2025130    131400   -9.3000 -137.6600       4.3       301       124        60
OIR    2025130    131400   -9.3000 -137.6700       4.6       296       124        60
OIR    2025130    131400   -9.3000 -137.6800       5.0       291       123        60
OIR    2025130    131400   -9.3000 -137.6900       5.4       287       123        60
OIR    2025130    131400   -9.3000 -137.7000       5.6       285       123        60
OIR    2025130    131400   -9.3000 -137.7100       5.7       284       122        60
OIR    2025130    131400   -9.3000 -137.7200       5.7       284       123        60
OIR    2025130    131400   -9.3000 -137.7300       5.8       284       125        60
OIR    2025130    131400   -9.3000 -137.7400       5.8       284       126        60
OIR    2025130    131400   -9.3000 -137.7500       5.8       284       127        60
OIR    2025130    131400   -9.3000 -137.7600       5.8       284       126        60
OIR    2025130    131400   -9.3000 -137.7700       5.9       284       125        60
OIR    2025130    131400   -9.3000 -137.7800       5.9       284       125        60
OIR    2025130    131400   -9.3000 -137.7900       5.9       284       125        60
OIR    2025130    131400   -9.3000 -137.8000       5.9       284       125        60
OIR    2025130    131400   -9.3000 -137.8100       5.9       284       123        60
OIR    2025130    131400   -9.3000 -137.8200       5.9       283       120        60
OIR    2025130    131400   -9.3000 -137.8300       5.9       283       119        60
OIR    2025130    131400   -9.3000 -137.8400       5.9       283       120        60
OIR    2025130    131400   -9.3000 -137.8500       5.9       282       120        60
OIR    2025130    131400   -9.3000 -137.8600       5.9       282       121        60
OIR    2025130    131400   -9.3000 -137.8700       5.9       281       122        60
OIR    2025130    131400   -9.3000 -137.8800       5.9       280       124        60
OIR    2025130    131400   -9.3000 -137.8900       5.8       278       127        60
OIR    2025130    131400   -9.3000 -137.9000       5.9       276       130        60
OIR    2025130    131400   -9.3000 -137.9100       5.9       274       131        60
OIR    2025130    131400   -9.3000 -137.9200       6.1       273       132        60
OIR    2025130    131400   -9.3000 -137.9300       6.4       273       131        60
OIR    2025130    131400   -9.3000 -137.9400       6.6       273       132        60
OIR    2025130    131400   -9.3000 -137.9500       7.0       273       135        60
OIR    2025130    131400   -9.3000 -137.9600       7.5       274       136        60
OIR    2025130    131400   -9.3000 -137.9700       8.2       274       137        60
OIR    2025130    131400   -9.3000 -137.9800       8.4       275       136        60
OIR    2025130    131400   -9.3000 -137.9900       8.5       275       135        60
OIR    2025130    131400   -9.3000 -138.0000       8.5       275       136        60
OIR    2025130    131400   -9.3000 -138.0100       8.5       275       138        60
OIR    2025130    131400   -9.3000 -138.0200       8.6       276       141        60
OIR    2025130    131400   -9.3000 -138.0300       8.6       276       144        60
OIR    2025130    131400   -9.3000 -138.0400       8.5       276       148        60
OIR    2025130    131400   -9.3000 -138.2800      26.3        16       146        60
OIR    2025130    131400   -9.3000 -138.2900      27.6        16       127        60
OIR    2025130    131400   -9.3000 -138.3000      28.6        15       103        60
OIR    2025130    131400   -9.3000 -138.3100      28.4        14       103        60
OIR    2025130    131400   -9.3000 -138.3200      28.7        14       103        60
OIR    2025130    131400   -9.3000 -138.3300      29.3        15       103        60
OIR    2025130    131400   -9.3000 -138.3400      29.3        15       103        60
OIR    2025130    131400   -9.3000 -138.3500      29.1        10       103        60
OIR    2025130    131400   -9.3000 -138.3600      29.3         0       103        60
OIR    2025130    131400   -9.3000 -138.3700      29.4       360       103        60
OIR    2025130    131400   -9.3000 -138.3800      29.4       359       103        60
OIR    2025130    131400   -9.3000 -138.3900      29.4       359       103        60
OIR    2025130    131400   -9.3000 -138.4000      29.5       358       103        60
OIR    2025130    131400   -9.3000 -138.4100      29.5       358       103        60
OIR    2025130    131400   -9.3000 -138.4200      29.5       358       103        60
OIR    2025130    131400   -9.3000 -138.4300      29.5       358       103        60
OIR    2025130    131400   -9.3000 -138.4400      29.5       357       103        60
OIR    2025130    131400   -9.3000 -138.4500      29.5       357       103        60
OIR    2025130    131400   -9.3000 -138.4600      29.5       357       103        60
OIR    2025130    131400   -9.3000 -138.4700      29.5       357       103        60
OIR    2025130    131400   -9.3000 -138.4800      29.4       357       103        60
OIR    2025130    131400   -9.3000 -138.4900      29.4       356       103        60
OIR    2025130    131400   -9.3000 -138.5000      29.4       356       103        60
OIR    2025130    131400   -9.3000 -138.5100      29.4       356       103        60
OIR    2025130    131400   -9.3000 -138.5200      29.4       356       103        60
OIR    2025130    131400   -9.3000 -138.5300      29.5       355       103        60
OIR    2025130    131400   -9.3000 -138.5400      29.4       355       103        60
OIR    2025130    131400   -9.3000 -138.5500      29.4       355       103        60
OIR    2025130    131400   -9.3000 -138.5600      29.3       354       103        60
OIR    2025130    131400   -9.3000 -138.5700      29.2       354       103        60
OIR    2025130    131400   -9.3000 -138.5800      29.0       353       103        60
OIR    2025130    131400   -9.3000 -138.5900      28.8       353       103        60
OIR    2025130    131400   -9.3000 -138.6000      28.5       352       103        60
OIR    2025130    131400   -9.3000 -138.6100      28.2       351       103        60
OIR    2025130    131400   -9.3000 -138.6200      28.0       351       103        60
OIR    2025130    131400   -9.3000 -138.6300      27.8       350       103        60
OIR    2025130    131400   -9.3000 -138.6400      27.6       349       103        60
OIR    2025130    131400   -9.3000 -138.6500      27.5       348       103        60
OIR    2025130    131400   -9.3000 -138.6600      27.5       345       103        60
OIR    2025130    131400   -9.3000 -138.6700      27.5       342       103        60
OIR    2025130    131400   -9.3000 -138.6800      27.4       340       103        60
OIR    2025130    131400   -9.3000 -138.6900      27.3       339       103        60
OIR    2025130    131400   -9.3000 -138.7000      27.2       338       103        60
OIR    2025130    131400   -9.3000 -138.7100      27.0       336       103        60
OIR    2025130    131400   -9.3000 -138.7200      26.5       334       103        60
OIR    2025130    131400   -9.3000 -138.7300      25.7       332       103        60
OIR    2025130    131400   -9.3000 -138.7400      25.1       330       103        60
OIR    2025130    131400   -9.3000 -138.7500      24.7       329       103        60
OIR    2025130    131400   -9.3000 -138.7600      24.6       328       103        60
OIR    2025130    131400   -9.3000 -138.7700      24.4       328       103        60
OIR    2025130    131400   -9.3000 -138.7800      24.3       327       105        60
OIR    2025130    131400   -9.3000 -138.7900      24.2       327       110        60
OIR    2025130    131400   -9.3000 -138.8000      24.0       327       112        60
OIR    2025130    131400   -9.3000 -138.8100      23.6       326       113        60
OIR    2025130    131400   -9.3000 -138.8200      23.1       324       114        60
OIR    2025130    131400   -9.3000 -138.8300      22.9       324       113        60
OIR    2025130    131400   -9.3000 -138.8400      22.9       324       113        60
OIR    2025130    131400   -9.3000 -138.8500      22.8       324       113        60
OIR    2025130    131400   -9.3000 -138.8600      22.8       324       116        60
OIR    2025130    131400   -9.3000 -138.8700      22.8       324       119        60
OIR    2025130    131400   -9.3000 -138.8800      22.7       323       123        60
OIR    2025130    131400   -9.3000 -138.8900      22.7       324       124        60
OIR    2025130    131400   -9.3000 -138.9000      22.7       324       125        60
OIR    2025130    131400   -9.3000 -138.9100      22.7       324       125        60
OIR    2025130    131400   -9.3000 -138.9200      22.2       324       125        60
OIR    2025130    131400   -9.3000 -138.9300      19.0       327       128        60
OIR    2025130    131400   -9.3000 -138.9400      17.8       328       131        60
OIR    2025130    131400   -9.3000 -138.9500      17.7       318       133        60
OIR    2025130    131400   -9.3000 -138.9600      17.6       317       136        60
OIR    2025130    131400   -9.3100 -136.3500      37.3        89       145        60
OIR    2025130    131400   -9.3100 -136.3600      37.3        89       142        60
OIR    2025130    131400   -9.3100 -136.4300      36.2        86       144        60
OIR    2025130    131400   -9.3100 -136.4400      36.6        86       144        60
OIR    2025130    131400   -9.3100 -136.4500      36.7        87       145        60
OIR    2025130    131400   -9.3100 -136.4600      36.7        88       144        60
OIR    2025130    131400   -9.3100 -136.4700      36.8        88       144        60
OIR    2025130    131400   -9.3100 -136.4800      36.8        88       141        60
OIR    2025130    131400   -9.3100 -136.4900      36.4        87       138        60
OIR    2025130    131400   -9.3100 -136.5000      36.0        87       136        60
OIR    2025130    131400   -9.3100 -136.5100      35.7        87       134        60
OIR    2025130    131400   -9.3100 -136.5200      35.4        86       132        60
OIR    2025130    131400   -9.3100 -136.5300      35.0        86       131        60
OIR    2025130    131400   -9.3100 -136.5400      34.4        86       130        60
OIR    2025130    131400   -9.3100 -136.5500      33.6        86       130        60
OIR    2025130    131400   -9.3100 -136.5600      32.9        85       130        60
OIR    2025130    131400   -9.3100 -136.5700      32.0        85       129        60
OIR    2025130    131400   -9.3100 -136.5800      30.4        84       128        60
OIR    2025130    131400   -9.3100 -136.5900      28.9        82       128        60
OIR    2025130    131400   -9.3100 -136.6000      27.7        80       128        60
OIR    2025130    131400   -9.3100 -136.6100      27.1        79       128        60
OIR    2025130    131400   -9.3100 -136.6200      26.7        78       128        60
OIR    2025130    131400   -9.3100 -136.6300      26.5        77       128        60
OIR    2025130    131400   -9.3100 -136.6400      26.4        77       127        60
OIR    2025130    131400   -9.3100 -136.6500      26.3        76       125        60
OIR    2025130    131400   -9.3100 -136.6600      26.3        76       124        60
OIR    2025130    131400   -9.3100 -136.6700      26.2        76       124        60
OIR    2025130    131400   -9.3100 -136.6800      26.2        75       123        60
OIR    2025130    131400   -9.3100 -136.6900      26.2        75       123        60
OIR    2025130    131400   -9.3100 -136.7000      26.2        75       122        60
OIR    2025130    131400   -9.3100 -136.7100      26.2        75       122        60
OIR    2025130    131400   -9.3100 -136.7200      26.1        75       122        60
OIR    2025130    131400   -9.3100 -136.7300      26.1        75       122        60
OIR    2025130    131400   -9.3100 -136.7400      26.1        75       122        60
OIR    2025130    131400   -9.3100 -136.7500      26.1        75       120        60
OIR    2025130    131400   -9.3100 -136.7600      26.1        75       116        60
OIR    2025130    131400   -9.3100 -136.7700      26.0        75       117        60
OIR    2025130    131400   -9.3100 -136.7800      26.0        75       117        60
OIR    2025130    131400   -9.3100 -136.7900      26.0        75       119        60
OIR    2025130    131400   -9.3100 -136.8000      26.0        75       120        60
OIR    2025130    131400   -9.3100 -136.8100      25.9        74       123        60
OIR    2025130    131400   -9.3100 -136.8200      25.8        74       125        60
OIR    2025130    131400   -9.3100 -136.8300      25.5        74       123        60
OIR    2025130    131400   -9.3100 -136.8400      25.5        74       122        60
OIR    2025130    131400   -9.3100 -136.8500      25.5        74       121        60
OIR    2025130    131400   -9.3100 -136.8600      25.5        74       120        60
OIR    2025130    131400   -9.3100 -136.8700      25.5        74       120        60
OIR    2025130    131400   -9.3100 -136.8800      25.6        74       119        60
OIR    2025130    131400   -9.3100 -136.8900      25.6        74       116        60
OIR    2025130    131400   -9.3100 -136.9000      25.8        74       116        60
OIR    2025130    131400   -9.3100 -136.9100      25.9        73       117        60
OIR    2025130    131400   -9.3100 -136.9200      26.1        73       117        60
OIR    2025130    131400   -9.3100 -136.9300      26.3        73       117        60
OIR    2025130    131400   -9.3100 -136.9400      26.5        73       116        60
OIR    2025130    131400   -9.3100 -136.9500      26.7        72       114        60
OIR    2025130    131400   -9.3100 -136.9600      26.8        72       112        60
OIR    2025130    131400   -9.3100 -136.9700      27.0        71       111        60
OIR    2025130    131400   -9.3100 -136.9800      27.1        70       111        60
OIR    2025130    131400   -9.3100 -136.9900      27.4        69       112        60
OIR    2025130    131400   -9.3100 -137.0000      27.6        68       113        60
OIR    2025130    131400   -9.3100 -137.0100      27.7        68       114        60
OIR    2025130    131400   -9.3100 -137.0200      27.9        67       115        60
OIR    2025130    131400   -9.3100 -137.0300      28.0        67       116        60
OIR    2025130    131400   -9.3100 -137.0400      28.1        66       119        60
OIR    2025130    131400   -9.3100 -137.0500      28.1        66       117        60
OIR    2025130    131400   -9.3100 -137.0600      28.1        65       116        60
OIR    2025130    131400   -9.3100 -137.0700      28.0        65       116        60
OIR    2025130    131400   -9.3100 -137.0800      28.1        65       114        60
OIR    2025130    131400   -9.3100 -137.0900      28.2        65       111        60
OIR    2025130    131400   -9.3100 -137.1000      28.3        65       109        60
OIR    2025130    131400   -9.3100 -137.1100      28.5        65       108        60
OIR    2025130    131400   -9.3100 -137.1200      28.6        65       108        60
OIR    2025130    131400   -9.3100 -137.1300      28.6        65       108        60
OIR    2025130    131400   -9.3100 -137.1400      28.7        65       109        60
OIR    2025130    131400   -9.3100 -137.1500      28.7        65       110        60
OIR    2025130    131400   -9.3100 -137.1600      28.7        65       110        60
OIR    2025130    131400   -9.3100 -137.1700      28.7        65       110        60
OIR    2025130    131400   -9.3100 -137.1800      28.7        65       111        60
OIR    2025130    131400   -9.3100 -137.1900      28.5        65       111        60
OIR    2025130    131400   -9.3100 -137.2000      28.1        65       108        60
OIR    2025130    131400   -9.3100 -137.2100      28.1        65       108        60
OIR    2025130    131400   -9.3100 -137.2200      28.0        65       107        60
OIR    2025130    131400   -9.3100 -137.2300      28.0        65       107        60
OIR    2025130    131400   -9.3100 -137.2400      27.8        65       107        60
OIR    2025130    131400   -9.3100 -137.2500      27.6        64       104        60
OIR    2025130    131400   -9.3100 -137.2600      27.4        64       103        60
OIR    2025130    131400   -9.3100 -137.2700      27.2        63       103        60
OIR    2025130    131400   -9.3100 -137.2800      27.2        63       103        60
OIR    2025130    131400   -9.3100 -137.2900      27.2        63       103        60
OIR    2025130    131400   -9.3100 -137.3000      27.2        63       103        60
OIR    2025130    131400   -9.3100 -137.3100      27.1        63       103        60
OIR    2025130    131400   -9.3100 -137.3200      27.1        63       103        60
OIR    2025130    131400   -9.3100 -137.3300      26.8        63       104        60
OIR    2025130    131400   -9.3100 -137.3400      24.4        61       103        60
OIR    2025130    131400   -9.3100 -137.3500      22.9        59       103        60
OIR    2025130    131400   -9.3100 -137.3600      21.7        59       103        60
OIR    2025130    131400   -9.3100 -137.3700      20.6        58       103        60
OIR    2025130    131400   -9.3100 -137.3800      19.4        58       103        60
OIR    2025130    131400   -9.3100 -137.3900      18.2        58       103        60
OIR    2025130    131400   -9.3100 -137.4000      17.1        59       103        60
OIR    2025130    131400   -9.3100 -137.4100      15.7        58       103        60
OIR    2025130    131400   -9.3100 -137.4200      14.4        58       103        60
OIR    2025130    131400   -9.3100 -137.4300      13.0        57       103        60
OIR    2025130    131400   -9.3100 -137.4400      10.8        55       103        60
OIR    2025130    131400   -9.3100 -137.4500       7.6        49       104        60
OIR    2025130    131400   -9.3100 -137.4600       4.7        27       104        60
OIR    2025130    131400   -9.3100 -137.4700       4.1       356       104        60
OIR    2025130    131400   -9.3100 -137.4800       4.5       346       107        60
OIR    2025130    131400   -9.3100 -137.4900       4.9       342       110        60
OIR    2025130    131400   -9.3100 -137.5000       5.3       340       114        60
OIR    2025130    131400   -9.3100 -137.5100       5.7       336       117        60
OIR    2025130    131400   -9.3100 -137.5200       5.8       335       120        60
OIR    2025130    131400   -9.3100 -137.5300       5.9       334       119        60
OIR    2025130    131400   -9.3100 -137.5400       5.9       333       116        60
OIR    2025130    131400   -9.3100 -137.5500       5.8       332       113        60
OIR    2025130    131400   -9.3100 -137.5600       5.7       330       112        60
OIR    2025130    131400   -9.3100 -137.5700       5.5       327       111        60
OIR    2025130    131400   -9.3100 -137.5800       5.2       325       112        60
OIR    2025130    131400   -9.3100 -137.5900       4.8       322       113        60
OIR    2025130    131400   -9.3100 -137.6000       4.3       318       115        60
OIR    2025130    131400   -9.3100 -137.6100       4.1       313       116        60
OIR    2025130    131400   -9.3100 -137.6200       4.0       309       117        60
OIR    2025130    131400   -9.3100 -137.6300       4.0       307       120        60
OIR    2025130    131400   -9.3100 -137.6400       4.1       305       122        60
OIR    2025130    131400   -9.3100 -137.6500       4.2       302       123        60
OIR    2025130    131400   -9.3100 -137.6600       4.3       298       123        60
OIR    2025130    131400   -9.3100 -137.6700       4.7       292       123        60
OIR    2025130    131400   -9.3100 -137.6800       5.1       288       122        60
OIR    2025130    131400   -9.3100 -137.6900       5.5       285       122        60
OIR    2025130    131400   -9.3100 -137.7000       5.6       284       122        60
OIR    2025130    131400   -9.3100 -137.7100       5.7       284       122        60
OIR    2025130    131400   -9.3100 -137.7200       5.7       284       122        60
OIR    2025130    131400   -9.3100 -137.7300       5.8       284       123        60
OIR    2025130    131400   -9.3100 -137.7400       5.8       284       125        60
OIR    2025130    131400   -9.3100 -137.7500       5.8       284       126        60
OIR    2025130    131400   -9.3100 -137.7600       5.8       284       125        60
OIR    2025130    131400   -9.3100 -137.7700       5.9       284       124        60
OIR    2025130    131400   -9.3100 -137.7800       5.9       284       124        60
OIR    2025130    131400   -9.3100 -137.7900       5.9       284       124        60
OIR    2025130    131400   -9.3100 -137.8000       5.9       284       123        60
OIR    2025130    131400   -9.3100 -137.8100       5.9       284       122        60
OIR    2025130    131400   -9.3100 -137.8200       5.9       283       120        60
OIR    2025130    131400   -9.3100 -137.8300       6.0       283       119        60
OIR    2025130    131400   -9.3100 -137.8400       6.0       283       120        60
OIR    2025130    131400   -9.3100 -137.8500       6.0       282       120        60
OIR    2025130    131400   -9.3100 -137.8600       6.0       282       120        60
OIR    2025130    131400   -9.3100 -137.8700       6.0       281       122        60
OIR    2025130    131400   -9.3100 -137.8800       6.0       280       124        60
OIR    2025130    131400   -9.3100 -137.8900       6.0       279       126        60
OIR    2025130    131400   -9.3100 -137.9000       6.0       277       127        60
OIR    2025130    131400   -9.3100 -137.9100       6.2       276       129        60
OIR    2025130    131400   -9.3100 -137.9200       6.5       275       129        60
OIR    2025130    131400   -9.3100 -137.9300       6.9       274       129        60
OIR    2025130    131400   -9.3100 -137.9400       7.2       273       131        60
OIR    2025130    131400   -9.3100 -137.9500       7.6       273       133        60
OIR    2025130    131400   -9.3100 -137.9600       8.1       273       135        60
OIR    2025130    131400   -9.3100 -137.9700       8.4       274       136        60
OIR    2025130    131400   -9.3100 -137.9800       8.6       275       135        60
OIR    2025130    131400   -9.3100 -137.9900       8.6       275       135        60
OIR    2025130    131400   -9.3100 -138.0000       8.6       275       135        60
OIR    2025130    131400   -9.3100 -138.0100       8.6       276       136        60
OIR    2025130    131400   -9.3100 -138.0200       8.6       276       137        60
OIR    2025130    131400   -9.3100 -138.0300       8.6       276       139        60
OIR    2025130    131400   -9.3100 -138.0400       8.6       277       142        60
OIR    2025130    131400   -9.3100 -138.0500       8.5       280       145        60
OIR    2025130    131400   -9.3100 -138.0600       8.0       289       147        60
OIR    2025130    131400   -9.3100 -138.2900      27.1        12       142        60
OIR    2025130    131400   -9.3100 -138.3000      28.3        11       125        60
OIR    2025130    131400   -9.3100 -138.3100      28.4        10       112        60
OIR    2025130    131400   -9.3100 -138.3200      27.9        10       103        60
OIR    2025130    131400   -9.3100 -138.3300      28.3        11       103        60
OIR    2025130    131400   -9.3100 -138.3400      28.7        10       103        60
OIR    2025130    131400   -9.3100 -138.3500      29.0         4       103        60
OIR    2025130    131400   -9.3100 -138.3600      29.5       360       103        60
OIR    2025130    131400   -9.3100 -138.3700      29.6       359       103        60
OIR    2025130    131400   -9.3100 -138.3800      29.6       359       103        60
OIR    2025130    131400   -9.3100 -138.3900      29.6       359       103        60
OIR    2025130    131400   -9.3100 -138.4000      29.7       358       103        60
OIR    2025130    131400   -9.3100 -138.4100      29.7       358       103        60
OIR    2025130    131400   -9.3100 -138.4200      29.7       358       103        60
OIR    2025130    131400   -9.3100 -138.4300      29.7       358       103        60
OIR    2025130    131400   -9.3100 -138.4400      29.7       357       103        60
OIR    2025130    131400   -9.3100 -138.4500      29.7       357       103        60
OIR    2025130    131400   -9.3100 -138.4600      29.7       357       103        60
OIR    2025130    131400   -9.3100 -138.4700      29.6       357       103        60
OIR    2025130    131400   -9.3100 -138.4800      29.6       356       103        60
OIR    2025130    131400   -9.3100 -138.4900      29.6       356       103        60
OIR    2025130    131400   -9.3100 -138.5000      29.6       356       103        60
OIR    2025130    131400   -9.3100 -138.5100      29.6       356       103        60
OIR    2025130    131400   -9.3100 -138.5200      29.6       355       103        60
OIR    2025130    131400   -9.3100 -138.5300      29.6       355       103        60
OIR    2025130    131400   -9.3100 -138.5400      29.6       355       103        60
OIR    2025130    131400   -9.3100 -138.5500      29.5       354       103        60
OIR    2025130    131400   -9.3100 -138.5600      29.4       354       103        60
OIR    2025130    131400   -9.3100 -138.5700      29.3       353       103        60
OIR    2025130    131400   -9.3100 -138.5800      29.1       353       103        60
OIR    2025130    131400   -9.3100 -138.5900      28.9       352       103        60
OIR    2025130    131400   -9.3100 -138.6000      28.7       352       103        60
OIR    2025130    131400   -9.3100 -138.6100      28.5       351       103        60
OIR    2025130    131400   -9.3100 -138.6200      28.2       350       103        60
OIR    2025130    131400   -9.3100 -138.6300      28.0       349       103        60
OIR    2025130    131400   -9.3100 -138.6400      28.0       348       103        60
OIR    2025130    131400   -9.3100 -138.6500      28.2       345       103        60
OIR    2025130    131400   -9.3100 -138.6600      28.4       343       103        60
OIR    2025130    131400   -9.3100 -138.6700      28.4       341       103        60
OIR    2025130    131400   -9.3100 -138.6800      28.2       339       103        60
OIR    2025130    131400   -9.3100 -138.6900      28.2       338       103        60
OIR    2025130    131400   -9.3100 -138.7000      28.2       337       103        60
OIR    2025130    131400   -9.3100 -138.7100      28.2       336       103        60
OIR    2025130    131400   -9.3100 -138.7200      27.7       334       103        60
OIR    2025130    131400   -9.3100 -138.7300      26.5       332       103        60
OIR    2025130    131400   -9.3100 -138.7400      25.5       330       103        60
OIR    2025130    131400   -9.3100 -138.7500      25.0       329       103        60
OIR    2025130    131400   -9.3100 -138.7600      24.8       328       103        60
OIR    2025130    131400   -9.3100 -138.7700      24.6       328       104        60
OIR    2025130    131400   -9.3100 -138.7800      24.5       328       105        60
OIR    2025130    131400   -9.3100 -138.7900      24.3       327       108        60
OIR    2025130    131400   -9.3100 -138.8000      24.3       327       110        60
OIR    2025130    131400   -9.3100 -138.8100      24.0       326       113        60
OIR    2025130    131400   -9.3100 -138.8200      23.4       325       114        60
OIR    2025130    131400   -9.3100 -138.8300      23.1       324       116        60
OIR    2025130    131400   -9.3100 -138.8400      23.0       324       116        60
OIR    2025130    131400   -9.3100 -138.8500      22.9       324       116        60
OIR    2025130    131400   -9.3100 -138.8600      22.8       323       119        60
OIR    2025130    131400   -9.3100 -138.8700      22.8       323       121        60
OIR    2025130    131400   -9.3100 -138.8800      22.8       323       124        60
OIR    2025130    131400   -9.3100 -138.8900      22.8       323       125        60
OIR    2025130    131400   -9.3100 -138.9000      22.7       323       125        60
OIR    2025130    131400   -9.3100 -138.9100      22.7       324       126        60
OIR    2025130    131400   -9.3100 -138.9200      22.4       324       128        60
OIR    2025130    131400   -9.3100 -138.9300      19.0       325       130        60
OIR    2025130    131400   -9.3100 -138.9400      17.6       326       132        60
OIR    2025130    131400   -9.3100 -138.9500      17.6       316       134        60
OIR    2025130    131400   -9.3100 -138.9600      17.6       316       138        60
OIR    2025130    131400   -9.3200 -136.3400      37.0        89       146        60
OIR    2025130    131400   -9.3200 -136.3500      37.1        89       144        60
OIR    2025130    131400   -9.3200 -136.3600      37.2        88       143        60
OIR    2025130    131400   -9.3200 -136.4200      36.0        85       146        60
OIR    2025130    131400   -9.3200 -136.4300      36.2        85       145        60
OIR    2025130    131400   -9.3200 -136.4400      36.6        85       144        60
OIR    2025130    131400   -9.3200 -136.4500      37.0        85       143        60
OIR    2025130    131400   -9.3200 -136.4600      37.3        86       143        60
OIR    2025130    131400   -9.3200 -136.4700      37.3        86       143        60
OIR    2025130    131400   -9.3200 -136.4800      37.1        86       141        60
OIR    2025130    131400   -9.3200 -136.4900      36.7        86       139        60
OIR    2025130    131400   -9.3200 -136.5000      36.2        86       137        60
OIR    2025130    131400   -9.3200 -136.5100      35.8        86       135        60
OIR    2025130    131400   -9.3200 -136.5200      35.5        86       132        60
OIR    2025130    131400   -9.3200 -136.5300      35.1        85       131        60
OIR    2025130    131400   -9.3200 -136.5400      34.6        85       130        60
OIR    2025130    131400   -9.3200 -136.5500      33.8        85       130        60
OIR    2025130    131400   -9.3200 -136.5600      32.9        85       130        60
OIR    2025130    131400   -9.3200 -136.5700      31.8        84       130        60
OIR    2025130    131400   -9.3200 -136.5800      30.0        82       129        60
OIR    2025130    131400   -9.3200 -136.5900      27.9        78       129        60
OIR    2025130    131400   -9.3200 -136.6000      27.1        77       128        60
OIR    2025130    131400   -9.3200 -136.6100      26.8        76       128        60
OIR    2025130    131400   -9.3200 -136.6200      26.6        76       128        60
OIR    2025130    131400   -9.3200 -136.6300      26.5        76       128        60
OIR    2025130    131400   -9.3200 -136.6400      26.5        76       127        60
OIR    2025130    131400   -9.3200 -136.6500      26.4        76       125        60
OIR    2025130    131400   -9.3200 -136.6600      26.3        75       125        60
OIR    2025130    131400   -9.3200 -136.6700      26.3        75       126        60
OIR    2025130    131400   -9.3200 -136.6800      26.2        75       124        60
OIR    2025130    131400   -9.3200 -136.6900      26.2        75       122        60
OIR    2025130    131400   -9.3200 -136.7000      26.2        75       122        60
OIR    2025130    131400   -9.3200 -136.7100      26.2        75       122        60
OIR    2025130    131400   -9.3200 -136.7200      26.1        75       122        60
OIR    2025130    131400   -9.3200 -136.7300      26.1        75       122        60
OIR    2025130    131400   -9.3200 -136.7400      26.1        75       122        60
OIR    2025130    131400   -9.3200 -136.7500      26.1        75       120        60
OIR    2025130    131400   -9.3200 -136.7600      26.1        75       117        60
OIR    2025130    131400   -9.3200 -136.7700      26.0        75       119        60
OIR    2025130    131400   -9.3200 -136.7800      26.0        75       120        60
OIR    2025130    131400   -9.3200 -136.7900      26.0        75       120        60
OIR    2025130    131400   -9.3200 -136.8000      26.0        75       121        60
OIR    2025130    131400   -9.3200 -136.8100      25.9        74       122        60
OIR    2025130    131400   -9.3200 -136.8200      25.8        74       123        60
OIR    2025130    131400   -9.3200 -136.8300      25.6        74       122        60
OIR    2025130    131400   -9.3200 -136.8400      25.5        74       122        60
OIR    2025130    131400   -9.3200 -136.8500      25.5        74       121        60
OIR    2025130    131400   -9.3200 -136.8600      25.5        74       121        60
OIR    2025130    131400   -9.3200 -136.8700      25.6        74       121        60
OIR    2025130    131400   -9.3200 -136.8800      25.6        73       119        60
OIR    2025130    131400   -9.3200 -136.8900      25.7        73       117        60
OIR    2025130    131400   -9.3200 -136.9000      25.9        73       117        60
OIR    2025130    131400   -9.3200 -136.9100      26.1        73       117        60
OIR    2025130    131400   -9.3200 -136.9200      26.3        73       117        60
OIR    2025130    131400   -9.3200 -136.9300      26.5        72       117        60
OIR    2025130    131400   -9.3200 -136.9400      26.7        72       115        60
OIR    2025130    131400   -9.3200 -136.9500      26.9        72       113        60
OIR    2025130    131400   -9.3200 -136.9600      27.1        71       111        60
OIR    2025130    131400   -9.3200 -136.9700      27.3        70       110        60
OIR    2025130    131400   -9.3200 -136.9800      27.5        69       110        60
OIR    2025130    131400   -9.3200 -136.9900      27.7        68       111        60
OIR    2025130    131400   -9.3200 -137.0000      27.8        68       113        60
OIR    2025130    131400   -9.3200 -137.0100      27.9        67       113        60
OIR    2025130    131400   -9.3200 -137.0200      28.1        67       114        60
OIR    2025130    131400   -9.3200 -137.0300      28.2        66       116        60
OIR    2025130    131400   -9.3200 -137.0400      28.3        66       119        60
OIR    2025130    131400   -9.3200 -137.0500      28.3        66       117        60
OIR    2025130    131400   -9.3200 -137.0600      28.3        65       116        60
OIR    2025130    131400   -9.3200 -137.0700      28.2        65       116        60
OIR    2025130    131400   -9.3200 -137.0800      28.3        65       114        60
OIR    2025130    131400   -9.3200 -137.0900      28.3        65       112        60
OIR    2025130    131400   -9.3200 -137.1000      28.4        65       110        60
OIR    2025130    131400   -9.3200 -137.1100      28.6        65       110        60
OIR    2025130    131400   -9.3200 -137.1200      28.6        65       111        60
OIR    2025130    131400   -9.3200 -137.1300      28.6        65       112        60
OIR    2025130    131400   -9.3200 -137.1400      28.7        65       109        60
OIR    2025130    131400   -9.3200 -137.1500      28.7        65       108        60
OIR    2025130    131400   -9.3200 -137.1600      28.7        65       108        60
OIR    2025130    131400   -9.3200 -137.1700      28.7        65       110        60
OIR    2025130    131400   -9.3200 -137.1800      28.7        65       111        60
OIR    2025130    131400   -9.3200 -137.1900      28.5        65       111        60
OIR    2025130    131400   -9.3200 -137.2000      28.2        65       108        60
OIR    2025130    131400   -9.3200 -137.2100      28.1        65       107        60
OIR    2025130    131400   -9.3200 -137.2200      28.0        65       105        60
OIR    2025130    131400   -9.3200 -137.2300      28.0        65       105        60
OIR    2025130    131400   -9.3200 -137.2400      27.8        65       105        60
OIR    2025130    131400   -9.3200 -137.2500      27.6        64       104        60
OIR    2025130    131400   -9.3200 -137.2600      27.4        64       103        60
OIR    2025130    131400   -9.3200 -137.2700      27.3        63       103        60
OIR    2025130    131400   -9.3200 -137.2800      27.2        63       103        60
OIR    2025130    131400   -9.3200 -137.2900      27.2        63       103        60
OIR    2025130    131400   -9.3200 -137.3000      27.2        63       103        60
OIR    2025130    131400   -9.3200 -137.3100      27.2        63       103        60
OIR    2025130    131400   -9.3200 -137.3200      27.1        63       103        60
OIR    2025130    131400   -9.3200 -137.3300      27.0        63       103        60
OIR    2025130    131400   -9.3200 -137.3400      25.3        61       103        60
OIR    2025130    131400   -9.3200 -137.3500      23.8        60       103        60
OIR    2025130    131400   -9.3200 -137.3600      22.7        59       103        60
OIR    2025130    131400   -9.3200 -137.3700      21.6        58       103        60
OIR    2025130    131400   -9.3200 -137.3800      20.4        58       103        60
OIR    2025130    131400   -9.3200 -137.3900      18.2        58       103        60
OIR    2025130    131400   -9.3200 -137.4000      16.7        58       103        60
OIR    2025130    131400   -9.3200 -137.4100      15.3        58       103        60
OIR    2025130    131400   -9.3200 -137.4200      14.1        58       103        60
OIR    2025130    131400   -9.3200 -137.4300      12.7        57       103        60
OIR    2025130    131400   -9.3200 -137.4400      10.3        55       103        60
OIR    2025130    131400   -9.3200 -137.4500       6.0        40       103        60
OIR    2025130    131400   -9.3200 -137.4800       4.0       336       107        60
OIR    2025130    131400   -9.3200 -137.4900       4.3       334       111        60
OIR    2025130    131400   -9.3200 -137.5000       4.8       332       115        60
OIR    2025130    131400   -9.3200 -137.5100       5.2       331       119        60
OIR    2025130    131400   -9.3200 -137.5200       5.3       330       119        60
OIR    2025130    131400   -9.3200 -137.5300       5.3       329       116        60
OIR    2025130    131400   -9.3200 -137.5400       5.1       328       116        60
OIR    2025130    131400   -9.3200 -137.5500       5.0       326       114        60
OIR    2025130    131400   -9.3200 -137.5600       4.9       323       113        60
OIR    2025130    131400   -9.3200 -137.5700       4.8       320       112        60
OIR    2025130    131400   -9.3200 -137.5800       4.5       318       112        60
OIR    2025130    131400   -9.3200 -137.5900       4.2       315       113        60
OIR    2025130    131400   -9.3200 -137.6000       4.0       312       115        60
OIR    2025130    131400   -9.3200 -137.6300       4.0       306       119        60
OIR    2025130    131400   -9.3200 -137.6400       4.0       304       121        60
OIR    2025130    131400   -9.3200 -137.6500       4.1       301       122        60
OIR    2025130    131400   -9.3200 -137.6600       4.4       295       122        60
OIR    2025130    131400   -9.3200 -137.6700       4.9       289       122        60
OIR    2025130    131400   -9.3200 -137.6800       5.3       286       121        60
OIR    2025130    131400   -9.3200 -137.6900       5.5       285       121        60
OIR    2025130    131400   -9.3200 -137.7000       5.6       284       121        60
OIR    2025130    131400   -9.3200 -137.7100       5.7       284       121        60
OIR    2025130    131400   -9.3200 -137.7200       5.7       284       121        60
OIR    2025130    131400   -9.3200 -137.7300       5.8       284       122        60
OIR    2025130    131400   -9.3200 -137.7400       5.8       284       123        60
OIR    2025130    131400   -9.3200 -137.7500       5.8       284       125        60
OIR    2025130    131400   -9.3200 -137.7600       5.9       284       124        60
OIR    2025130    131400   -9.3200 -137.7700       5.9       284       124        60
OIR    2025130    131400   -9.3200 -137.7800       5.9       284       123        60
OIR    2025130    131400   -9.3200 -137.7900       5.9       284       122        60
OIR    2025130    131400   -9.3200 -137.8000       5.9       284       122        60
OIR    2025130    131400   -9.3200 -137.8100       6.0       284       121        60
OIR    2025130    131400   -9.3200 -137.8200       6.0       284       120        60
OIR    2025130    131400   -9.3200 -137.8300       6.0       283       119        60
OIR    2025130    131400   -9.3200 -137.8400       6.0       283       119        60
OIR    2025130    131400   -9.3200 -137.8500       6.0       282       119        60
OIR    2025130    131400   -9.3200 -137.8600       6.1       282       120        60
OIR    2025130    131400   -9.3200 -137.8700       6.1       281       122        60
OIR    2025130    131400   -9.3200 -137.8800       6.1       280       124        60
OIR    2025130    131400   -9.3200 -137.8900       6.1       280       124        60
OIR    2025130    131400   -9.3200 -137.9000       6.2       278       124        60
OIR    2025130    131400   -9.3200 -137.9100       6.6       277       126        60
OIR    2025130    131400   -9.3200 -137.9200       7.1       276       127        60
OIR    2025130    131400   -9.3200 -137.9300       7.5       274       127        60
OIR    2025130    131400   -9.3200 -137.9400       7.9       273       129        60
OIR    2025130    131400   -9.3200 -137.9500       8.4       273       132        60
OIR    2025130    131400   -9.3200 -137.9600       8.7       274       134        60
OIR    2025130    131400   -9.3200 -137.9700       8.8       274       135        60
OIR    2025130    131400   -9.3200 -137.9800       8.8       274       134        60
OIR    2025130    131400   -9.3200 -137.9900       8.7       275       134        60
OIR    2025130    131400   -9.3200 -138.0000       8.7       275       134        60
OIR    2025130    131400   -9.3200 -138.0100       8.6       276       134        60
OIR    2025130    131400   -9.3200 -138.0200       8.6       276       134        60
OIR    2025130    131400   -9.3200 -138.0300       8.7       277       135        60
OIR    2025130    131400   -9.3200 -138.0400       8.7       278       137        60
OIR    2025130    131400   -9.3200 -138.0500       8.8       282       141        60
OIR    2025130    131400   -9.3200 -138.0600       8.4       292       144        60
OIR    2025130    131400   -9.3200 -138.0700       8.3       303       147        60
OIR    2025130    131400   -9.3200 -138.3000      27.5         8       134        60
OIR    2025130    131400   -9.3200 -138.3100      27.6         6       116        60
OIR    2025130    131400   -9.3200 -138.3200      27.7         4       104        60
OIR    2025130    131400   -9.3200 -138.3300      27.7         3       103        60
OIR    2025130    131400   -9.3200 -138.3400      28.6         3       103        60
OIR    2025130    131400   -9.3200 -138.3500      29.1         1       103        60
OIR    2025130    131400   -9.3200 -138.3600      29.5       359       103        60
OIR    2025130    131400   -9.3200 -138.3700      29.7       359       103        60
OIR    2025130    131400   -9.3200 -138.3800      29.8       359       103        60
OIR    2025130    131400   -9.3200 -138.3900      29.8       358       103        60
OIR    2025130    131400   -9.3200 -138.4000      29.9       358       103        60
OIR    2025130    131400   -9.3200 -138.4100      29.9       358       103        60
OIR    2025130    131400   -9.3200 -138.4200      29.9       358       103        60
OIR    2025130    131400   -9.3200 -138.4300      29.9       357       103        60
OIR    2025130    131400   -9.3200 -138.4400      29.9       357       103        60
OIR    2025130    131400   -9.3200 -138.4500      29.8       357       103        60
OIR    2025130    131400   -9.3200 -138.4600      29.8       357       103        60
OIR    2025130    131400   -9.3200 -138.4700      29.8       357       103        60
OIR    2025130    131400   -9.3200 -138.4800      29.8       356       103        60
OIR    2025130    131400   -9.3200 -138.4900      29.8       356       103        60
OIR    2025130    131400   -9.3200 -138.5000      29.7       356       103        60
OIR    2025130    131400   -9.3200 -138.5100      29.7       356       103        60
OIR    2025130    131400   -9.3200 -138.5200      29.7       355       103        60
OIR    2025130    131400   -9.3200 -138.5300      29.7       355       103        60
OIR    2025130    131400   -9.3200 -138.5400      29.7       355       103        60
OIR    2025130    131400   -9.3200 -138.5500      29.7       354       103        60
OIR    2025130    131400   -9.3200 -138.5600      29.6       354       103        60
OIR    2025130    131400   -9.3200 -138.5700      29.5       353       103        60
OIR    2025130    131400   -9.3200 -138.5800      29.3       352       103        60
OIR    2025130    131400   -9.3200 -138.5900      29.2       352       103        60
OIR    2025130    131400   -9.3200 -138.6000      29.0       351       103        60
OIR    2025130    131400   -9.3200 -138.6100      28.7       350       103        60
OIR    2025130    131400   -9.3200 -138.6200      28.6       349       103        60
OIR    2025130    131400   -9.3200 -138.6300      28.5       348       103        60
OIR    2025130    131400   -9.3200 -138.6400      28.9       345       103        60
OIR    2025130    131400   -9.3200 -138.6500      29.2       343       103        60
OIR    2025130    131400   -9.3200 -138.6600      29.3       341       103        60
OIR    2025130    131400   -9.3200 -138.6700      29.2       340       103        60
OIR    2025130    131400   -9.3200 -138.6800      29.2       339       103        60
OIR    2025130    131400   -9.3200 -138.6900      29.1       338       103        60
OIR    2025130    131400   -9.3200 -138.7000      29.4       336       103        60
OIR    2025130    131400   -9.3200 -138.7100      29.2       335       104        60
OIR    2025130    131400   -9.3200 -138.7200      28.7       334       104        60
OIR    2025130    131400   -9.3200 -138.7300      27.6       332       104        60
OIR    2025130    131400   -9.3200 -138.7400      26.0       330       103        60
OIR    2025130    131400   -9.3200 -138.7500      25.2       329       103        60
OIR    2025130    131400   -9.3200 -138.7600      24.9       328       104        60
OIR    2025130    131400   -9.3200 -138.7700      24.8       328       104        60
OIR    2025130    131400   -9.3200 -138.7800      24.7       328       105        60
OIR    2025130    131400   -9.3200 -138.7900      24.7       327       107        60
OIR    2025130    131400   -9.3200 -138.8000      24.6       327       110        60
OIR    2025130    131400   -9.3200 -138.8100      24.4       327       113        60
OIR    2025130    131400   -9.3200 -138.8200      23.9       325       115        60
OIR    2025130    131400   -9.3200 -138.8300      23.6       324       117        60
OIR    2025130    131400   -9.3200 -138.8400      23.3       324       119        60
OIR    2025130    131400   -9.3200 -138.8500      23.1       324       121        60
OIR    2025130    131400   -9.3200 -138.8600      23.0       323       122        60
OIR    2025130    131400   -9.3200 -138.8700      22.9       323       123        60
OIR    2025130    131400   -9.3200 -138.8800      22.9       323       124        60
OIR    2025130    131400   -9.3200 -138.8900      22.8       323       125        60
OIR    2025130    131400   -9.3200 -138.9000      22.8       323       126        60
OIR    2025130    131400   -9.3200 -138.9100      22.9       323       128        60
OIR    2025130    131400   -9.3200 -138.9200      22.6       323       131        60
OIR    2025130    131400   -9.3200 -138.9300      19.4       322       132        60
OIR    2025130    131400   -9.3200 -138.9400      17.9       322       134        60
OIR    2025130    131400   -9.3200 -138.9500      17.6       316       135        60
OIR    2025130    131400   -9.3200 -138.9600      17.6       316       138        60
OIR    2025130    131400   -9.3300 -136.4200      36.0        84       145        60
OIR    2025130    131400   -9.3300 -136.4300      36.3        84       144        60
OIR    2025130    131400   -9.3300 -136.4400      36.7        85       142        60
OIR    2025130    131400   -9.3300 -136.4500      37.1        85       141        60
OIR    2025130    131400   -9.3300 -136.4600      37.3        85       141        60
OIR    2025130    131400   -9.3300 -136.4700      37.4        85       141        60
OIR    2025130    131400   -9.3300 -136.4800      37.2        86       139        60
OIR    2025130    131400   -9.3300 -136.4900      37.0        86       138        60
OIR    2025130    131400   -9.3300 -136.5000      36.4        86       137        60
OIR    2025130    131400   -9.3300 -136.5100      35.8        85       135        60
OIR    2025130    131400   -9.3300 -136.5200      35.5        85       133        60
OIR    2025130    131400   -9.3300 -136.5300      35.2        85       131        60
OIR    2025130    131400   -9.3300 -136.5400      34.7        85       130        60
OIR    2025130    131400   -9.3300 -136.5500      33.9        84       130        60
OIR    2025130    131400   -9.3300 -136.5600      32.9        84       130        60
OIR    2025130    131400   -9.3300 -136.5700      31.5        83       130        60
OIR    2025130    131400   -9.3300 -136.5800      28.8        79       129        60
OIR    2025130    131400   -9.3300 -136.5900      27.2        77       128        60
OIR    2025130    131400   -9.3300 -136.6000      26.8        76       127        60
OIR    2025130    131400   -9.3300 -136.6100      26.7        76       126        60
OIR    2025130    131400   -9.3300 -136.6200      26.6        76       126        60
OIR    2025130    131400   -9.3300 -136.6300      26.5        75       126        60
OIR    2025130    131400   -9.3300 -136.6400      26.5        75       125        60
OIR    2025130    131400   -9.3300 -136.6500      26.4        75       125        60
OIR    2025130    131400   -9.3300 -136.6600      26.3        75       125        60
OIR    2025130    131400   -9.3300 -136.6700      26.3        75       125        60
OIR    2025130    131400   -9.3300 -136.6800      26.3        75       124        60
OIR    2025130    131400   -9.3300 -136.6900      26.2        75       123        60
OIR    2025130    131400   -9.3300 -136.7000      26.2        75       123        60
OIR    2025130    131400   -9.3300 -136.7100      26.2        75       123        60
OIR    2025130    131400   -9.3300 -136.7200      26.2        75       123        60
OIR    2025130    131400   -9.3300 -136.7300      26.1        75       122        60
OIR    2025130    131400   -9.3300 -136.7400      26.1        75       121        60
OIR    2025130    131400   -9.3300 -136.7500      26.1        75       120        60
OIR    2025130    131400   -9.3300 -136.7600      26.1        75       116        60
OIR    2025130    131400   -9.3300 -136.7700      26.0        75       117        60
OIR    2025130    131400   -9.3300 -136.7800      26.0        75       120        60
OIR    2025130    131400   -9.3300 -136.7900      26.0        75       120        60
OIR    2025130    131400   -9.3300 -136.8000      25.9        74       121        60
OIR    2025130    131400   -9.3300 -136.8100      25.8        74       122        60
OIR    2025130    131400   -9.3300 -136.8200      25.8        74       123        60
OIR    2025130    131400   -9.3300 -136.8300      25.6        74       123        60
OIR    2025130    131400   -9.3300 -136.8400      25.6        74       122        60
OIR    2025130    131400   -9.3300 -136.8500      25.5        74       122        60
OIR    2025130    131400   -9.3300 -136.8600      25.5        74       121        60
OIR    2025130    131400   -9.3300 -136.8700      25.6        73       121        60
OIR    2025130    131400   -9.3300 -136.8800      25.7        73       119        60
OIR    2025130    131400   -9.3300 -136.8900      25.8        73       116        60
OIR    2025130    131400   -9.3300 -136.9000      26.0        73       116        60
OIR    2025130    131400   -9.3300 -136.9100      26.2        73       117        60
OIR    2025130    131400   -9.3300 -136.9200      26.4        72       117        60
OIR    2025130    131400   -9.3300 -136.9300      26.7        72       116        60
OIR    2025130    131400   -9.3300 -136.9400      26.8        71       115        60
OIR    2025130    131400   -9.3300 -136.9500      27.1        71       113        60
OIR    2025130    131400   -9.3300 -136.9600      27.4        70       111        60
OIR    2025130    131400   -9.3300 -136.9700      27.6        69       110        60
OIR    2025130    131400   -9.3300 -136.9800      27.7        68       110        60
OIR    2025130    131400   -9.3300 -136.9900      27.8        68       111        60
OIR    2025130    131400   -9.3300 -137.0000      28.0        67       113        60
OIR    2025130    131400   -9.3300 -137.0100      28.1        67       114        60
OIR    2025130    131400   -9.3300 -137.0200      28.3        66       114        60
OIR    2025130    131400   -9.3300 -137.0300      28.3        66       116        60
OIR    2025130    131400   -9.3300 -137.0400      28.4        66       116        60
OIR    2025130    131400   -9.3300 -137.0500      28.4        65       116        60
OIR    2025130    131400   -9.3300 -137.0600      28.4        65       116        60
OIR    2025130    131400   -9.3300 -137.0700      28.4        65       116        60
OIR    2025130    131400   -9.3300 -137.0800      28.4        65       114        60
OIR    2025130    131400   -9.3300 -137.0900      28.5        65       112        60
OIR    2025130    131400   -9.3300 -137.1000      28.5        65       112        60
OIR    2025130    131400   -9.3300 -137.1100      28.6        65       112        60
OIR    2025130    131400   -9.3300 -137.1200      28.6        65       112        60
OIR    2025130    131400   -9.3300 -137.1300      28.6        65       112        60
OIR    2025130    131400   -9.3300 -137.1400      28.7        65       109        60
OIR    2025130    131400   -9.3300 -137.1500      28.7        65       108        60
OIR    2025130    131400   -9.3300 -137.1600      28.7        65       110        60
OIR    2025130    131400   -9.3300 -137.1700      28.7        65       111        60
OIR    2025130    131400   -9.3300 -137.1800      28.6        65       113        60
OIR    2025130    131400   -9.3300 -137.1900      28.5        65       112        60
OIR    2025130    131400   -9.3300 -137.2000      28.2        65       108        60
OIR    2025130    131400   -9.3300 -137.2100      28.1        65       107        60
OIR    2025130    131400   -9.3300 -137.2200      28.0        65       107        60
OIR    2025130    131400   -9.3300 -137.2300      28.0        65       107        60
OIR    2025130    131400   -9.3300 -137.2400      27.8        64       108        60
OIR    2025130    131400   -9.3300 -137.2500      27.6        64       104        60
OIR    2025130    131400   -9.3300 -137.2600      27.4        64       103        60
OIR    2025130    131400   -9.3300 -137.2700      27.3        63       103        60
OIR    2025130    131400   -9.3300 -137.2800      27.3        63       103        60
OIR    2025130    131400   -9.3300 -137.2900      27.2        63       103        60
OIR    2025130    131400   -9.3300 -137.3000      27.2        63       103        60
OIR    2025130    131400   -9.3300 -137.3100      27.2        63       103        60
OIR    2025130    131400   -9.3300 -137.3200      27.2        63       103        60
OIR    2025130    131400   -9.3300 -137.3300      27.1        63       103        60
OIR    2025130    131400   -9.3300 -137.3400      25.8        61       103        60
OIR    2025130    131400   -9.3300 -137.3500      24.3        60       103        60
OIR    2025130    131400   -9.3300 -137.3600      23.3        59       103        60
OIR    2025130    131400   -9.3300 -137.3700      22.4        58       103        60
OIR    2025130    131400   -9.3300 -137.3800      21.2        58       103        60
OIR    2025130    131400   -9.3300 -137.3900      18.6        57       103        60
OIR    2025130    131400   -9.3300 -137.4000      16.5        58       103        60
OIR    2025130    131400   -9.3300 -137.4100      15.2        58       103        60
OIR    2025130    131400   -9.3300 -137.4200      13.9        58       103        60
OIR    2025130    131400   -9.3300 -137.4300      12.4        58       103        60
OIR    2025130    131400   -9.3300 -137.4400       9.8        54       103        60
OIR    2025130    131400   -9.3300 -137.4500       4.9        32       103        60
OIR    2025130    131400   -9.3300 -137.4900       4.0       328       111        60
OIR    2025130    131400   -9.3300 -137.5000       4.3       326       114        60
OIR    2025130    131400   -9.3300 -137.5100       4.5       325       116        60
OIR    2025130    131400   -9.3300 -137.5200       4.6       325       116        60
OIR    2025130    131400   -9.3300 -137.5300       4.5       324       115        60
OIR    2025130    131400   -9.3300 -137.5400       4.4       322       113        60
OIR    2025130    131400   -9.3300 -137.5500       4.4       320       111        60
OIR    2025130    131400   -9.3300 -137.5600       4.3       318       111        60
OIR    2025130    131400   -9.3300 -137.5700       4.2       316       111        60
OIR    2025130    131400   -9.3300 -137.5800       4.1       314       111        60
OIR    2025130    131400   -9.3300 -137.6300       4.0       305       116        60
OIR    2025130    131400   -9.3300 -137.6400       4.0       303       117        60
OIR    2025130    131400   -9.3300 -137.6500       4.2       299       119        60
OIR    2025130    131400   -9.3300 -137.6600       4.5       294       119        60
OIR    2025130    131400   -9.3300 -137.6700       5.1       288       117        60
OIR    2025130    131400   -9.3300 -137.6800       5.3       286       116        60
OIR    2025130    131400   -9.3300 -137.6900       5.5       285       116        60
OIR    2025130    131400   -9.3300 -137.7000       5.6       284       116        60
OIR    2025130    131400   -9.3300 -137.7100       5.7       284       116        60
OIR    2025130    131400   -9.3300 -137.7200       5.7       284       116        60
OIR    2025130    131400   -9.3300 -137.7300       5.8       284       117        60
OIR    2025130    131400   -9.3300 -137.7400       5.8       284       119        60
OIR    2025130    131400   -9.3300 -137.7500       5.8       284       122        60
OIR    2025130    131400   -9.3300 -137.7600       5.9       284       122        60
OIR    2025130    131400   -9.3300 -137.7700       5.9       284       122        60
OIR    2025130    131400   -9.3300 -137.7800       5.9       284       122        60
OIR    2025130    131400   -9.3300 -137.7900       5.9       284       122        60
OIR    2025130    131400   -9.3300 -137.8000       6.0       284       121        60
OIR    2025130    131400   -9.3300 -137.8100       6.0       284       120        60
OIR    2025130    131400   -9.3300 -137.8200       6.0       284       120        60
OIR    2025130    131400   -9.3300 -137.8300       6.0       283       120        60
OIR    2025130    131400   -9.3300 -137.8400       6.1       283       119        60
OIR    2025130    131400   -9.3300 -137.8500       6.1       283       120        60
OIR    2025130    131400   -9.3300 -137.8600       6.2       282       120        60
OIR    2025130    131400   -9.3300 -137.8700       6.3       281       122        60
OIR    2025130    131400   -9.3300 -137.8800       6.3       280       123        60
OIR    2025130    131400   -9.3300 -137.8900       6.5       280       123        60
OIR    2025130    131400   -9.3300 -137.9000       6.7       279       123        60
OIR    2025130    131400   -9.3300 -137.9100       7.2       277       123        60
OIR    2025130    131400   -9.3300 -137.9200       7.8       276       124        60
OIR    2025130    131400   -9.3300 -137.9300       8.3       274       124        60
OIR    2025130    131400   -9.3300 -137.9400       8.6       274       126        60
OIR    2025130    131400   -9.3300 -137.9500       8.9       274       129        60
OIR    2025130    131400   -9.3300 -137.9600       9.0       274       131        60
OIR    2025130    131400   -9.3300 -137.9700       9.0       274       132        60
OIR    2025130    131400   -9.3300 -137.9800       9.0       274       133        60
OIR    2025130    131400   -9.3300 -137.9900       8.9       275       133        60
OIR    2025130    131400   -9.3300 -138.0000       8.9       275       134        60
OIR    2025130    131400   -9.3300 -138.0100       8.8       276       135        60
OIR    2025130    131400   -9.3300 -138.0200       8.7       277       134        60
OIR    2025130    131400   -9.3300 -138.0300       8.8       278       134        60
OIR    2025130    131400   -9.3300 -138.0400       9.0       281       135        60
OIR    2025130    131400   -9.3300 -138.0500       9.2       286       137        60
OIR    2025130    131400   -9.3300 -138.0600       9.0       295       139        60
OIR    2025130    131400   -9.3300 -138.0700       8.9       305       142        60
OIR    2025130    131400   -9.3300 -138.0800       8.9       315       145        60
OIR    2025130    131400   -9.3300 -138.3000      26.8         7       119        60
OIR    2025130    131400   -9.3300 -138.3100      27.1         4       112        60
OIR    2025130    131400   -9.3300 -138.3200      27.4         2       107        60
OIR    2025130    131400   -9.3300 -138.3300      27.8         2       104        60
OIR    2025130    131400   -9.3300 -138.3400      28.4         1       103        60
OIR    2025130    131400   -9.3300 -138.3500      29.1       360       103        60
OIR    2025130    131400   -9.3300 -138.3600      29.6       359       103        60
OIR    2025130    131400   -9.3300 -138.3700      29.8       359       103        60
OIR    2025130    131400   -9.3300 -138.3800      30.0       358       103        60
OIR    2025130    131400   -9.3300 -138.3900      30.1       358       103        60
OIR    2025130    131400   -9.3300 -138.4000      30.2       358       103        60
OIR    2025130    131400   -9.3300 -138.4100      30.2       358       103        60
OIR    2025130    131400   -9.3300 -138.4200      30.2       357       103        60
OIR    2025130    131400   -9.3300 -138.4300      30.1       357       103        60
OIR    2025130    131400   -9.3300 -138.4400      30.1       357       103        60
OIR    2025130    131400   -9.3300 -138.4500      30.0       357       103        60
OIR    2025130    131400   -9.3300 -138.4600      30.0       357       103        60
OIR    2025130    131400   -9.3300 -138.4700      30.0       356       103        60
OIR    2025130    131400   -9.3300 -138.4800      30.0       356       103        60
OIR    2025130    131400   -9.3300 -138.4900      30.0       356       103        60
OIR    2025130    131400   -9.3300 -138.5000      29.9       356       103        60
OIR    2025130    131400   -9.3300 -138.5100      29.9       355       103        60
OIR    2025130    131400   -9.3300 -138.5200      29.9       355       103        60
OIR    2025130    131400   -9.3300 -138.5300      29.9       355       103        60
OIR    2025130    131400   -9.3300 -138.5400      29.9       355       103        60
OIR    2025130    131400   -9.3300 -138.5500      29.9       354       103        60
OIR    2025130    131400   -9.3300 -138.5600      29.9       353       103        60
OIR    2025130    131400   -9.3300 -138.5700      29.7       353       103        60
OIR    2025130    131400   -9.3300 -138.5800      29.6       352       103        60
OIR    2025130    131400   -9.3300 -138.5900      29.4       351       103        60
OIR    2025130    131400   -9.3300 -138.6000      29.2       350       103        60
OIR    2025130    131400   -9.3300 -138.6100      29.1       349       103        60
OIR    2025130    131400   -9.3300 -138.6200      29.0       348       103        60
OIR    2025130    131400   -9.3300 -138.6300      29.2       345       103        60
OIR    2025130    131400   -9.3300 -138.6400      29.6       342       103        60
OIR    2025130    131400   -9.3300 -138.6500      29.8       341       103        60
OIR    2025130    131400   -9.3300 -138.6600      29.7       340       103        60
OIR    2025130    131400   -9.3300 -138.6700      29.8       339       103        60
OIR    2025130    131400   -9.3300 -138.6800      29.8       338       103        60
OIR    2025130    131400   -9.3300 -138.6900      29.9       337       104        60
OIR    2025130    131400   -9.3300 -138.7000      30.1       336       104        60
OIR    2025130    131400   -9.3300 -138.7100      30.0       335       105        60
OIR    2025130    131400   -9.3300 -138.7200      29.4       334       105        60
OIR    2025130    131400   -9.3300 -138.7300      28.5       332       104        60
OIR    2025130    131400   -9.3300 -138.7400      26.3       329       104        60
OIR    2025130    131400   -9.3300 -138.7500      25.4       329       104        60
OIR    2025130    131400   -9.3300 -138.7600      25.1       328       104        60
OIR    2025130    131400   -9.3300 -138.7700      24.9       328       104        60
OIR    2025130    131400   -9.3300 -138.7800      24.8       328       105        60
OIR    2025130    131400   -9.3300 -138.7900      24.8       328       108        60
OIR    2025130    131400   -9.3300 -138.8000      24.7       327       111        60
OIR    2025130    131400   -9.3300 -138.8100      24.6       327       115        60
OIR    2025130    131400   -9.3300 -138.8200      24.4       326       116        60
OIR    2025130    131400   -9.3300 -138.8300      24.0       325       119        60
OIR    2025130    131400   -9.3300 -138.8400      23.8       324       121        60
OIR    2025130    131400   -9.3300 -138.8500      23.6       324       123        60
OIR    2025130    131400   -9.3300 -138.8600      23.5       324       124        60
OIR    2025130    131400   -9.3300 -138.8700      23.4       323       124        60
OIR    2025130    131400   -9.3300 -138.8800      23.3       323       122        60
OIR    2025130    131400   -9.3300 -138.8900      23.4       323       124        60
OIR    2025130    131400   -9.3300 -138.9000      23.6       323       128        60
OIR    2025130    131400   -9.3300 -138.9100      23.5       323       131        60
OIR    2025130    131400   -9.3300 -138.9200      23.3       323       134        60
OIR    2025130    131400   -9.3300 -138.9300      19.9       320       134        60
OIR    2025130    131400   -9.3300 -138.9400      17.9       318       135        60
OIR    2025130    131400   -9.3300 -138.9500      17.6       316       134        60
OIR    2025130    131400   -9.3300 -138.9600      17.6       316       135        60
OIR    2025130    131400   -9.3400 -136.4200      36.1        83       145        60
OIR    2025130    131400   -9.3400 -136.4300      36.5        84       143        60
OIR    2025130    131400   -9.3400 -136.4400      37.0        84       141        60
OIR    2025130    131400   -9.3400 -136.4500      37.3        84       139        60
OIR    2025130    131400   -9.3400 -136.4600      37.5        85       139        60
OIR    2025130    131400   -9.3400 -136.4700      37.6        85       139        60
OIR    2025130    131400   -9.3400 -136.4800      37.5        85       138        60
OIR    2025130    131400   -9.3400 -136.4900      37.2        85       137        60
OIR    2025130    131400   -9.3400 -136.5000      36.7        85       136        60
OIR    2025130    131400   -9.3400 -136.5100      36.1        85       135        60
OIR    2025130    131400   -9.3400 -136.5200      35.6        84       133        60
OIR    2025130    131400   -9.3400 -136.5300      35.3        84       132        60
OIR    2025130    131400   -9.3400 -136.5400      34.8        84       130        60
OIR    2025130    131400   -9.3400 -136.5500      33.9        83       130        60
OIR    2025130    131400   -9.3400 -136.5600      32.7        83       130        60
OIR    2025130    131400   -9.3400 -136.5700      30.9        81       129        60
OIR    2025130    131400   -9.3400 -136.5800      28.1        78       129        60
OIR    2025130    131400   -9.3400 -136.5900      26.9        76       127        60
OIR    2025130    131400   -9.3400 -136.6000      26.7        76       126        60
OIR    2025130    131400   -9.3400 -136.6100      26.6        75       125        60
OIR    2025130    131400   -9.3400 -136.6200      26.5        75       124        60
OIR    2025130    131400   -9.3400 -136.6300      26.5        75       123        60
OIR    2025130    131400   -9.3400 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.3400 -136.6500      26.4        75       125        60
OIR    2025130    131400   -9.3400 -136.6600      26.4        75       125        60
OIR    2025130    131400   -9.3400 -136.6700      26.3        75       125        60
OIR    2025130    131400   -9.3400 -136.6800      26.3        75       124        60
OIR    2025130    131400   -9.3400 -136.6900      26.3        75       123        60
OIR    2025130    131400   -9.3400 -136.7000      26.2        75       123        60
OIR    2025130    131400   -9.3400 -136.7100      26.2        75       123        60
OIR    2025130    131400   -9.3400 -136.7200      26.2        75       124        60
OIR    2025130    131400   -9.3400 -136.7300      26.1        75       123        60
OIR    2025130    131400   -9.3400 -136.7400      26.1        75       121        60
OIR    2025130    131400   -9.3400 -136.7500      26.1        75       119        60
OIR    2025130    131400   -9.3400 -136.7600      26.1        75       116        60
OIR    2025130    131400   -9.3400 -136.7700      26.0        75       117        60
OIR    2025130    131400   -9.3400 -136.7800      26.0        75       120        60
OIR    2025130    131400   -9.3400 -136.7900      26.0        74       120        60
OIR    2025130    131400   -9.3400 -136.8000      25.9        74       120        60
OIR    2025130    131400   -9.3400 -136.8100      25.8        74       122        60
OIR    2025130    131400   -9.3400 -136.8200      25.7        74       123        60
OIR    2025130    131400   -9.3400 -136.8300      25.6        74       123        60
OIR    2025130    131400   -9.3400 -136.8400      25.6        74       123        60
OIR    2025130    131400   -9.3400 -136.8500      25.6        74       122        60
OIR    2025130    131400   -9.3400 -136.8600      25.6        73       121        60
OIR    2025130    131400   -9.3400 -136.8700      25.6        73       120        60
OIR    2025130    131400   -9.3400 -136.8800      25.7        73       117        60
OIR    2025130    131400   -9.3400 -136.8900      25.9        73       115        60
OIR    2025130    131400   -9.3400 -136.9000      26.0        72       116        60
OIR    2025130    131400   -9.3400 -136.9100      26.3        72       117        60
OIR    2025130    131400   -9.3400 -136.9200      26.6        71       116        60
OIR    2025130    131400   -9.3400 -136.9300      26.9        71       116        60
OIR    2025130    131400   -9.3400 -136.9400      27.1        70       114        60
OIR    2025130    131400   -9.3400 -136.9500      27.4        70       113        60
OIR    2025130    131400   -9.3400 -136.9600      27.7        69       111        60
OIR    2025130    131400   -9.3400 -136.9700      28.0        68       110        60
OIR    2025130    131400   -9.3400 -136.9800      28.1        68       111        60
OIR    2025130    131400   -9.3400 -136.9900      28.1        67       112        60
OIR    2025130    131400   -9.3400 -137.0000      28.2        67       113        60
OIR    2025130    131400   -9.3400 -137.0100      28.3        66       114        60
OIR    2025130    131400   -9.3400 -137.0200      28.4        66       114        60
OIR    2025130    131400   -9.3400 -137.0300      28.5        66       115        60
OIR    2025130    131400   -9.3400 -137.0400      28.5        65       115        60
OIR    2025130    131400   -9.3400 -137.0500      28.5        65       116        60
OIR    2025130    131400   -9.3400 -137.0600      28.5        65       116        60
OIR    2025130    131400   -9.3400 -137.0700      28.5        65       115        60
OIR    2025130    131400   -9.3400 -137.0800      28.5        65       114        60
OIR    2025130    131400   -9.3400 -137.0900      28.6        65       113        60
OIR    2025130    131400   -9.3400 -137.1000      28.6        65       113        60
OIR    2025130    131400   -9.3400 -137.1100      28.6        65       113        60
OIR    2025130    131400   -9.3400 -137.1200      28.6        65       112        60
OIR    2025130    131400   -9.3400 -137.1300      28.6        65       112        60
OIR    2025130    131400   -9.3400 -137.1400      28.6        65       109        60
OIR    2025130    131400   -9.3400 -137.1500      28.7        65       108        60
OIR    2025130    131400   -9.3400 -137.1600      28.6        65       111        60
OIR    2025130    131400   -9.3400 -137.1700      28.6        65       113        60
OIR    2025130    131400   -9.3400 -137.1800      28.6        65       114        60
OIR    2025130    131400   -9.3400 -137.1900      28.4        65       112        60
OIR    2025130    131400   -9.3400 -137.2000      28.2        65       109        60
OIR    2025130    131400   -9.3400 -137.2100      28.1        65       108        60
OIR    2025130    131400   -9.3400 -137.2200      28.0        65       108        60
OIR    2025130    131400   -9.3400 -137.2300      28.0        65       108        60
OIR    2025130    131400   -9.3400 -137.2400      27.8        64       109        60
OIR    2025130    131400   -9.3400 -137.2500      27.6        64       104        60
OIR    2025130    131400   -9.3400 -137.2600      27.4        63       103        60
OIR    2025130    131400   -9.3400 -137.2700      27.3        63       103        60
OIR    2025130    131400   -9.3400 -137.2800      27.3        63       103        60
OIR    2025130    131400   -9.3400 -137.2900      27.3        63       103        60
OIR    2025130    131400   -9.3400 -137.3000      27.2        63       103        60
OIR    2025130    131400   -9.3400 -137.3100      27.2        63       103        60
OIR    2025130    131400   -9.3400 -137.3200      27.2        63       103        60
OIR    2025130    131400   -9.3400 -137.3300      27.1        63       104        60
OIR    2025130    131400   -9.3400 -137.3400      26.2        62       103        60
OIR    2025130    131400   -9.3400 -137.3500      24.8        60       103        60
OIR    2025130    131400   -9.3400 -137.3600      23.7        59       103        60
OIR    2025130    131400   -9.3400 -137.3700      22.9        58       103        60
OIR    2025130    131400   -9.3400 -137.3800      21.8        58       103        60
OIR    2025130    131400   -9.3400 -137.3900      19.0        58       103        60
OIR    2025130    131400   -9.3400 -137.4000      16.7        58       103        60
OIR    2025130    131400   -9.3400 -137.4100      15.2        58       103        60
OIR    2025130    131400   -9.3400 -137.4200      13.9        59       103        60
OIR    2025130    131400   -9.3400 -137.4300      12.3        58       103        60
OIR    2025130    131400   -9.3400 -137.4400       9.5        54       103        60
OIR    2025130    131400   -9.3400 -137.4500       4.3        26       103        60
OIR    2025130    131400   -9.3400 -137.5100       4.1       322       113        60
OIR    2025130    131400   -9.3400 -137.5200       4.2       322       114        60
OIR    2025130    131400   -9.3400 -137.5300       4.2       321       114        60
OIR    2025130    131400   -9.3400 -137.5400       4.1       320       110        60
OIR    2025130    131400   -9.3400 -137.5500       4.1       318       108        60
OIR    2025130    131400   -9.3400 -137.5600       4.0       316       109        60
OIR    2025130    131400   -9.3400 -137.5700       4.0       314       109        60
OIR    2025130    131400   -9.3400 -137.6400       4.0       302       116        60
OIR    2025130    131400   -9.3400 -137.6500       4.3       298       116        60
OIR    2025130    131400   -9.3400 -137.6600       4.8       292       115        60
OIR    2025130    131400   -9.3400 -137.6700       5.2       287       115        60
OIR    2025130    131400   -9.3400 -137.6800       5.4       286       115        60
OIR    2025130    131400   -9.3400 -137.6900       5.5       285       115        60
OIR    2025130    131400   -9.3400 -137.7000       5.6       284       115        60
OIR    2025130    131400   -9.3400 -137.7100       5.7       284       114        60
OIR    2025130    131400   -9.3400 -137.7200       5.7       284       114        60
OIR    2025130    131400   -9.3400 -137.7300       5.8       284       114        60
OIR    2025130    131400   -9.3400 -137.7400       5.8       284       116        60
OIR    2025130    131400   -9.3400 -137.7500       5.8       284       119        60
OIR    2025130    131400   -9.3400 -137.7600       5.9       284       120        60
OIR    2025130    131400   -9.3400 -137.7700       5.9       284       120        60
OIR    2025130    131400   -9.3400 -137.7800       5.9       284       121        60
OIR    2025130    131400   -9.3400 -137.7900       5.9       284       121        60
OIR    2025130    131400   -9.3400 -137.8000       6.0       284       120        60
OIR    2025130    131400   -9.3400 -137.8100       6.0       284       120        60
OIR    2025130    131400   -9.3400 -137.8200       6.0       284       119        60
OIR    2025130    131400   -9.3400 -137.8300       6.1       284       119        60
OIR    2025130    131400   -9.3400 -137.8400       6.2       283       119        60
OIR    2025130    131400   -9.3400 -137.8500       6.3       283       119        60
OIR    2025130    131400   -9.3400 -137.8600       6.5       282       120        60
OIR    2025130    131400   -9.3400 -137.8700       6.7       281       121        60
OIR    2025130    131400   -9.3400 -137.8800       6.9       280       122        60
OIR    2025130    131400   -9.3400 -137.8900       7.2       279       122        60
OIR    2025130    131400   -9.3400 -137.9000       7.6       278       122        60
OIR    2025130    131400   -9.3400 -137.9100       8.1       277       121        60
OIR    2025130    131400   -9.3400 -137.9200       8.6       275       121        60
OIR    2025130    131400   -9.3400 -137.9300       8.9       274       122        60
OIR    2025130    131400   -9.3400 -137.9400       9.1       274       124        60
OIR    2025130    131400   -9.3400 -137.9500       9.2       274       125        60
OIR    2025130    131400   -9.3400 -137.9600       9.3       274       127        60
OIR    2025130    131400   -9.3400 -137.9700       9.3       274       129        60
OIR    2025130    131400   -9.3400 -137.9800       9.3       275       130        60
OIR    2025130    131400   -9.3400 -137.9900       9.2       275       132        60
OIR    2025130    131400   -9.3400 -138.0000       9.1       276       133        60
OIR    2025130    131400   -9.3400 -138.0100       9.0       277       134        60
OIR    2025130    131400   -9.3400 -138.0200       9.0       279       133        60
OIR    2025130    131400   -9.3400 -138.0300       9.2       282       133        60
OIR    2025130    131400   -9.3400 -138.0400       9.4       287       133        60
OIR    2025130    131400   -9.3400 -138.0500       9.7       292       134        60
OIR    2025130    131400   -9.3400 -138.0600       9.8       298       136        60
OIR    2025130    131400   -9.3400 -138.0700       9.7       306       139        60
OIR    2025130    131400   -9.3400 -138.0800       9.8       317       143        60
OIR    2025130    131400   -9.3400 -138.2900      25.2         9       143        60
OIR    2025130    131400   -9.3400 -138.3000      26.1         6       119        60
OIR    2025130    131400   -9.3400 -138.3100      26.7         4       114        60
OIR    2025130    131400   -9.3400 -138.3200      27.2         0       110        60
OIR    2025130    131400   -9.3400 -138.3300      27.4       360       105        60
OIR    2025130    131400   -9.3400 -138.3400      28.1       359       104        60
OIR    2025130    131400   -9.3400 -138.3500      29.0       359       104        60
OIR    2025130    131400   -9.3400 -138.3600      29.6       358       103        60
OIR    2025130    131400   -9.3400 -138.3700      29.9       358       103        60
OIR    2025130    131400   -9.3400 -138.3800      30.1       358       103        60
OIR    2025130    131400   -9.3400 -138.3900      30.3       358       103        60
OIR    2025130    131400   -9.3400 -138.4000      30.3       358       103        60
OIR    2025130    131400   -9.3400 -138.4100      30.3       358       103        60
OIR    2025130    131400   -9.3400 -138.4200      30.3       357       103        60
OIR    2025130    131400   -9.3400 -138.4300      30.3       357       103        60
OIR    2025130    131400   -9.3400 -138.4400      30.3       357       103        60
OIR    2025130    131400   -9.3400 -138.4500      30.3       357       103        60
OIR    2025130    131400   -9.3400 -138.4600      30.3       357       103        60
OIR    2025130    131400   -9.3400 -138.4700      30.2       356       103        60
OIR    2025130    131400   -9.3400 -138.4800      30.2       356       103        60
OIR    2025130    131400   -9.3400 -138.4900      30.2       356       103        60
OIR    2025130    131400   -9.3400 -138.5000      30.2       356       103        60
OIR    2025130    131400   -9.3400 -138.5100      30.2       355       103        60
OIR    2025130    131400   -9.3400 -138.5200      30.2       355       103        60
OIR    2025130    131400   -9.3400 -138.5300      30.2       355       103        60
OIR    2025130    131400   -9.3400 -138.5400      30.2       354       103        60
OIR    2025130    131400   -9.3400 -138.5500      30.2       354       103        60
OIR    2025130    131400   -9.3400 -138.5600      30.1       353       103        60
OIR    2025130    131400   -9.3400 -138.5700      30.0       353       103        60
OIR    2025130    131400   -9.3400 -138.5800      29.8       351       103        60
OIR    2025130    131400   -9.3400 -138.5900      29.7       350       103        60
OIR    2025130    131400   -9.3400 -138.6000      29.5       349       103        60
OIR    2025130    131400   -9.3400 -138.6100      29.4       348       103        60
OIR    2025130    131400   -9.3400 -138.6200      29.5       345       103        60
OIR    2025130    131400   -9.3400 -138.6300      29.8       343       103        60
OIR    2025130    131400   -9.3400 -138.6400      30.1       341       103        60
OIR    2025130    131400   -9.3400 -138.6500      30.2       339       103        60
OIR    2025130    131400   -9.3400 -138.6600      30.3       339       103        60
OIR    2025130    131400   -9.3400 -138.6700      30.4       338       103        60
OIR    2025130    131400   -9.3400 -138.6800      30.5       337       103        60
OIR    2025130    131400   -9.3400 -138.6900      30.6       336       104        60
OIR    2025130    131400   -9.3400 -138.7000      30.7       336       105        60
OIR    2025130    131400   -9.3400 -138.7100      30.5       335       108        60
OIR    2025130    131400   -9.3400 -138.7200      29.8       333       109        60
OIR    2025130    131400   -9.3400 -138.7300      29.1       332       108        60
OIR    2025130    131400   -9.3400 -138.7400      26.5       329       107        60
OIR    2025130    131400   -9.3400 -138.7500      25.6       329       107        60
OIR    2025130    131400   -9.3400 -138.7600      25.3       329       105        60
OIR    2025130    131400   -9.3400 -138.7700      25.0       328       104        60
OIR    2025130    131400   -9.3400 -138.7800      24.9       328       105        60
OIR    2025130    131400   -9.3400 -138.7900      24.8       327       109        60
OIR    2025130    131400   -9.3400 -138.8000      24.8       327       112        60
OIR    2025130    131400   -9.3400 -138.8100      24.8       327       116        60
OIR    2025130    131400   -9.3400 -138.8200      24.7       326       117        60
OIR    2025130    131400   -9.3400 -138.8300      24.5       325       120        60
OIR    2025130    131400   -9.3400 -138.8400      24.3       325       123        60
OIR    2025130    131400   -9.3400 -138.8500      24.2       324       125        60
OIR    2025130    131400   -9.3400 -138.8600      24.0       324       126        60
OIR    2025130    131400   -9.3400 -138.8700      24.0       324       125        60
OIR    2025130    131400   -9.3400 -138.8800      24.1       324       122        60
OIR    2025130    131400   -9.3400 -138.8900      24.4       323       125        60
OIR    2025130    131400   -9.3400 -138.9000      24.4       323       129        60
OIR    2025130    131400   -9.3400 -138.9100      24.1       323       134        60
OIR    2025130    131400   -9.3400 -138.9200      23.9       323       138        60
OIR    2025130    131400   -9.3400 -138.9300      21.0       319       139        60
OIR    2025130    131400   -9.3400 -138.9400      17.8       317       139        60
OIR    2025130    131400   -9.3400 -138.9500      17.7       316       137        60
OIR    2025130    131400   -9.3400 -138.9600      17.7       316       136        60
OIR    2025130    131400   -9.3400 -138.9700      17.5       317       146        60
OIR    2025130    131400   -9.3500 -136.4100      36.0        83       144        60
OIR    2025130    131400   -9.3500 -136.4200      36.3        83       143        60
OIR    2025130    131400   -9.3500 -136.4300      37.0        83       140        60
OIR    2025130    131400   -9.3500 -136.4400      37.7        82       139        60
OIR    2025130    131400   -9.3500 -136.4500      38.2        82       137        60
OIR    2025130    131400   -9.3500 -136.4600      38.6        82       137        60
OIR    2025130    131400   -9.3500 -136.4700      38.8        82       137        60
OIR    2025130    131400   -9.3500 -136.4800      38.8        83       137        60
OIR    2025130    131400   -9.3500 -136.4900      38.3        83       137        60
OIR    2025130    131400   -9.3500 -136.5000      37.4        83       137        60
OIR    2025130    131400   -9.3500 -136.5100      36.5        84       136        60
OIR    2025130    131400   -9.3500 -136.5200      35.9        84       133        60
OIR    2025130    131400   -9.3500 -136.5300      35.4        83       131        60
OIR    2025130    131400   -9.3500 -136.5400      34.8        83       131        60
OIR    2025130    131400   -9.3500 -136.5500      33.8        83       131        60
OIR    2025130    131400   -9.3500 -136.5600      32.3        82       130        60
OIR    2025130    131400   -9.3500 -136.5700      30.1        80       129        60
OIR    2025130    131400   -9.3500 -136.5800      27.6        77       128        60
OIR    2025130    131400   -9.3500 -136.5900      26.8        76       127        60
OIR    2025130    131400   -9.3500 -136.6000      26.7        75       126        60
OIR    2025130    131400   -9.3500 -136.6100      26.6        75       124        60
OIR    2025130    131400   -9.3500 -136.6200      26.5        75       123        60
OIR    2025130    131400   -9.3500 -136.6300      26.5        75       123        60
OIR    2025130    131400   -9.3500 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.3500 -136.6500      26.4        75       124        60
OIR    2025130    131400   -9.3500 -136.6600      26.4        75       125        60
OIR    2025130    131400   -9.3500 -136.6700      26.3        75       124        60
OIR    2025130    131400   -9.3500 -136.6800      26.3        75       124        60
OIR    2025130    131400   -9.3500 -136.6900      26.3        75       123        60
OIR    2025130    131400   -9.3500 -136.7000      26.2        75       123        60
OIR    2025130    131400   -9.3500 -136.7100      26.2        75       122        60
OIR    2025130    131400   -9.3500 -136.7200      26.2        75       123        60
OIR    2025130    131400   -9.3500 -136.7300      26.1        75       122        60
OIR    2025130    131400   -9.3500 -136.7400      26.1        75       121        60
OIR    2025130    131400   -9.3500 -136.7500      26.1        75       119        60
OIR    2025130    131400   -9.3500 -136.7600      26.1        75       116        60
OIR    2025130    131400   -9.3500 -136.7700      26.0        74       116        60
OIR    2025130    131400   -9.3500 -136.7800      26.0        74       117        60
OIR    2025130    131400   -9.3500 -136.7900      25.9        74       117        60
OIR    2025130    131400   -9.3500 -136.8000      25.8        74       117        60
OIR    2025130    131400   -9.3500 -136.8100      25.7        74       120        60
OIR    2025130    131400   -9.3500 -136.8200      25.7        74       121        60
OIR    2025130    131400   -9.3500 -136.8300      25.6        74       122        60
OIR    2025130    131400   -9.3500 -136.8400      25.6        74       122        60
OIR    2025130    131400   -9.3500 -136.8500      25.6        73       122        60
OIR    2025130    131400   -9.3500 -136.8600      25.6        73       121        60
OIR    2025130    131400   -9.3500 -136.8700      25.6        73       120        60
OIR    2025130    131400   -9.3500 -136.8800      25.8        73       116        60
OIR    2025130    131400   -9.3500 -136.8900      25.9        72       115        60
OIR    2025130    131400   -9.3500 -136.9000      26.1        72       116        60
OIR    2025130    131400   -9.3500 -136.9100      26.4        71       116        60
OIR    2025130    131400   -9.3500 -136.9200      26.8        70       116        60
OIR    2025130    131400   -9.3500 -136.9300      27.2        70       116        60
OIR    2025130    131400   -9.3500 -136.9400      27.4        69       114        60
OIR    2025130    131400   -9.3500 -136.9500      27.7        68       113        60
OIR    2025130    131400   -9.3500 -136.9600      28.0        68       111        60
OIR    2025130    131400   -9.3500 -136.9700      28.2        67       111        60
OIR    2025130    131400   -9.3500 -136.9800      28.3        67       112        60
OIR    2025130    131400   -9.3500 -136.9900      28.3        67       113        60
OIR    2025130    131400   -9.3500 -137.0000      28.4        66       114        60
OIR    2025130    131400   -9.3500 -137.0100      28.4        66       114        60
OIR    2025130    131400   -9.3500 -137.0200      28.5        65       113        60
OIR    2025130    131400   -9.3500 -137.0300      28.5        65       113        60
OIR    2025130    131400   -9.3500 -137.0400      28.6        65       113        60
OIR    2025130    131400   -9.3500 -137.0500      28.6        65       115        60
OIR    2025130    131400   -9.3500 -137.0600      28.6        65       115        60
OIR    2025130    131400   -9.3500 -137.0700      28.6        65       115        60
OIR    2025130    131400   -9.3500 -137.0800      28.6        65       114        60
OIR    2025130    131400   -9.3500 -137.0900      28.6        65       113        60
OIR    2025130    131400   -9.3500 -137.1000      28.6        65       113        60
OIR    2025130    131400   -9.3500 -137.1100      28.6        65       113        60
OIR    2025130    131400   -9.3500 -137.1200      28.6        65       112        60
OIR    2025130    131400   -9.3500 -137.1300      28.6        65       111        60
OIR    2025130    131400   -9.3500 -137.1400      28.6        65       111        60
OIR    2025130    131400   -9.3500 -137.1500      28.6        65       111        60
OIR    2025130    131400   -9.3500 -137.1600      28.6        65       112        60
OIR    2025130    131400   -9.3500 -137.1700      28.6        65       112        60
OIR    2025130    131400   -9.3500 -137.1800      28.6        65       113        60
OIR    2025130    131400   -9.3500 -137.1900      28.3        65       112        60
OIR    2025130    131400   -9.3500 -137.2000      28.2        65       110        60
OIR    2025130    131400   -9.3500 -137.2100      28.1        65       110        60
OIR    2025130    131400   -9.3500 -137.2200      28.0        65       109        60
OIR    2025130    131400   -9.3500 -137.2300      27.9        64       109        60
OIR    2025130    131400   -9.3500 -137.2400      27.7        64       109        60
OIR    2025130    131400   -9.3500 -137.2500      27.6        64       104        60
OIR    2025130    131400   -9.3500 -137.2600      27.4        63       103        60
OIR    2025130    131400   -9.3500 -137.2700      27.4        63       103        60
OIR    2025130    131400   -9.3500 -137.2800      27.3        63       103        60
OIR    2025130    131400   -9.3500 -137.2900      27.3        63       103        60
OIR    2025130    131400   -9.3500 -137.3000      27.2        63       103        60
OIR    2025130    131400   -9.3500 -137.3100      27.2        63       103        60
OIR    2025130    131400   -9.3500 -137.3200      27.2        63       103        60
OIR    2025130    131400   -9.3500 -137.3300      27.1        63       103        60
OIR    2025130    131400   -9.3500 -137.3400      26.3        62       103        60
OIR    2025130    131400   -9.3500 -137.3500      24.9        60       103        60
OIR    2025130    131400   -9.3500 -137.3600      24.1        59       103        60
OIR    2025130    131400   -9.3500 -137.3700      23.4        58       103        60
OIR    2025130    131400   -9.3500 -137.3800      22.2        58       103        60
OIR    2025130    131400   -9.3500 -137.3900      19.4        58       103        60
OIR    2025130    131400   -9.3500 -137.4000      17.2        58       103        60
OIR    2025130    131400   -9.3500 -137.4100      15.4        59       103        60
OIR    2025130    131400   -9.3500 -137.4200      14.1        59       103        60
OIR    2025130    131400   -9.3500 -137.4300      12.5        59       103        60
OIR    2025130    131400   -9.3500 -137.4400       9.3        55       103        60
OIR    2025130    131400   -9.3500 -137.4500       4.0        25       103        60
OIR    2025130    131400   -9.3500 -137.6400       4.0       302       113        60
OIR    2025130    131400   -9.3500 -137.6500       4.3       297       113        60
OIR    2025130    131400   -9.3500 -137.6600       4.8       291       113        60
OIR    2025130    131400   -9.3500 -137.6700       5.2       287       114        60
OIR    2025130    131400   -9.3500 -137.6800       5.4       286       115        60
OIR    2025130    131400   -9.3500 -137.6900       5.5       285       114        60
OIR    2025130    131400   -9.3500 -137.7000       5.6       285       113        60
OIR    2025130    131400   -9.3500 -137.7100       5.7       284       112        60
OIR    2025130    131400   -9.3500 -137.7200       5.7       284       111        60
OIR    2025130    131400   -9.3500 -137.7300       5.8       284       111        60
OIR    2025130    131400   -9.3500 -137.7400       5.8       284       114        60
OIR    2025130    131400   -9.3500 -137.7500       5.8       284       117        60
OIR    2025130    131400   -9.3500 -137.7600       5.9       284       117        60
OIR    2025130    131400   -9.3500 -137.7700       5.9       284       117        60
OIR    2025130    131400   -9.3500 -137.7800       5.9       284       119        60
OIR    2025130    131400   -9.3500 -137.7900       6.0       284       120        60
OIR    2025130    131400   -9.3500 -137.8000       6.0       284       119        60
OIR    2025130    131400   -9.3500 -137.8100       6.0       284       117        60
OIR    2025130    131400   -9.3500 -137.8200       6.1       284       117        60
OIR    2025130    131400   -9.3500 -137.8300       6.2       284       117        60
OIR    2025130    131400   -9.3500 -137.8400       6.4       283       117        60
OIR    2025130    131400   -9.3500 -137.8500       6.7       283       117        60
OIR    2025130    131400   -9.3500 -137.8600       7.1       282       117        60
OIR    2025130    131400   -9.3500 -137.8700       7.5       281       120        60
OIR    2025130    131400   -9.3500 -137.8800       7.8       280       121        60
OIR    2025130    131400   -9.3500 -137.8900       8.3       279       121        60
OIR    2025130    131400   -9.3500 -137.9000       8.6       278       121        60
OIR    2025130    131400   -9.3500 -137.9100       8.9       277       121        60
OIR    2025130    131400   -9.3500 -137.9200       9.1       276       120        60
OIR    2025130    131400   -9.3500 -137.9300       9.3       275       120        60
OIR    2025130    131400   -9.3500 -137.9400       9.5       275       120        60
OIR    2025130    131400   -9.3500 -137.9500       9.6       275       121        60
OIR    2025130    131400   -9.3500 -137.9600       9.7       275       123        60
OIR    2025130    131400   -9.3500 -137.9700       9.8       275       126        60
OIR    2025130    131400   -9.3500 -137.9800       9.8       276       128        60
OIR    2025130    131400   -9.3500 -137.9900       9.7       277       129        60
OIR    2025130    131400   -9.3500 -138.0000       9.7       278       130        60
OIR    2025130    131400   -9.3500 -138.0100       9.7       281       131        60
OIR    2025130    131400   -9.3500 -138.0200       9.7       285       130        60
OIR    2025130    131400   -9.3500 -138.0300       9.8       288       130        60
OIR    2025130    131400   -9.3500 -138.0400       9.8       292       129        60
OIR    2025130    131400   -9.3500 -138.0500      10.3       297       131        60
OIR    2025130    131400   -9.3500 -138.0600      10.4       301       133        60
OIR    2025130    131400   -9.3500 -138.0700      10.4       306       137        60
OIR    2025130    131400   -9.3500 -138.0800      10.5       313       142        60
OIR    2025130    131400   -9.3500 -138.0900      10.9       323       147        60
OIR    2025130    131400   -9.3500 -138.3000      25.0         9       141        60
OIR    2025130    131400   -9.3500 -138.3100      25.8         5       125        60
OIR    2025130    131400   -9.3500 -138.3200      26.5       357       113        60
OIR    2025130    131400   -9.3500 -138.3300      26.5       356       110        60
OIR    2025130    131400   -9.3500 -138.3400      27.0       355       108        60
OIR    2025130    131400   -9.3500 -138.3500      28.4       357       105        60
OIR    2025130    131400   -9.3500 -138.3600      29.3       357       104        60
OIR    2025130    131400   -9.3500 -138.3700      29.8       358       103        60
OIR    2025130    131400   -9.3500 -138.3800      30.1       358       103        60
OIR    2025130    131400   -9.3500 -138.3900      30.3       358       103        60
OIR    2025130    131400   -9.3500 -138.4000      30.4       358       103        60
OIR    2025130    131400   -9.3500 -138.4100      30.4       357       103        60
OIR    2025130    131400   -9.3500 -138.4200      30.5       357       103        60
OIR    2025130    131400   -9.3500 -138.4300      30.5       357       103        60
OIR    2025130    131400   -9.3500 -138.4400      30.5       357       103        60
OIR    2025130    131400   -9.3500 -138.4500      30.6       357       103        60
OIR    2025130    131400   -9.3500 -138.4600      30.5       356       103        60
OIR    2025130    131400   -9.3500 -138.4700      30.5       356       103        60
OIR    2025130    131400   -9.3500 -138.4800      30.5       356       103        60
OIR    2025130    131400   -9.3500 -138.4900      30.5       356       103        60
OIR    2025130    131400   -9.3500 -138.5000      30.6       356       103        60
OIR    2025130    131400   -9.3500 -138.5100      30.6       355       103        60
OIR    2025130    131400   -9.3500 -138.5200      30.6       355       103        60
OIR    2025130    131400   -9.3500 -138.5300      30.6       355       103        60
OIR    2025130    131400   -9.3500 -138.5400      30.6       354       103        60
OIR    2025130    131400   -9.3500 -138.5500      30.5       354       103        60
OIR    2025130    131400   -9.3500 -138.5600      30.4       353       103        60
OIR    2025130    131400   -9.3500 -138.5700      30.2       352       103        60
OIR    2025130    131400   -9.3500 -138.5800      30.0       351       103        60
OIR    2025130    131400   -9.3500 -138.5900      29.9       350       103        60
OIR    2025130    131400   -9.3500 -138.6000      29.8       348       103        60
OIR    2025130    131400   -9.3500 -138.6100      29.7       346       103        60
OIR    2025130    131400   -9.3500 -138.6200      29.9       343       103        60
OIR    2025130    131400   -9.3500 -138.6300      30.1       341       103        60
OIR    2025130    131400   -9.3500 -138.6400      30.4       339       103        60
OIR    2025130    131400   -9.3500 -138.6500      30.6       338       103        60
OIR    2025130    131400   -9.3500 -138.6600      30.7       338       103        60
OIR    2025130    131400   -9.3500 -138.6700      30.7       337       103        60
OIR    2025130    131400   -9.3500 -138.6800      30.8       337       103        60
OIR    2025130    131400   -9.3500 -138.6900      30.8       336       104        60
OIR    2025130    131400   -9.3500 -138.7000      30.9       336       107        60
OIR    2025130    131400   -9.3500 -138.7100      30.8       335       110        60
OIR    2025130    131400   -9.3500 -138.7200      30.1       333       112        60
OIR    2025130    131400   -9.3500 -138.7300      29.3       332       112        60
OIR    2025130    131400   -9.3500 -138.7400      26.5       329       111        60
OIR    2025130    131400   -9.3500 -138.7500      25.7       329       111        60
OIR    2025130    131400   -9.3500 -138.7600      25.5       329       109        60
OIR    2025130    131400   -9.3500 -138.7700      25.2       328       107        60
OIR    2025130    131400   -9.3500 -138.7800      25.0       328       108        60
OIR    2025130    131400   -9.3500 -138.7900      24.9       328       110        60
OIR    2025130    131400   -9.3500 -138.8000      24.9       327       113        60
OIR    2025130    131400   -9.3500 -138.8100      24.9       327       116        60
OIR    2025130    131400   -9.3500 -138.8200      24.9       326       119        60
OIR    2025130    131400   -9.3500 -138.8300      24.7       325       121        60
OIR    2025130    131400   -9.3500 -138.8400      24.6       325       124        60
OIR    2025130    131400   -9.3500 -138.8500      24.6       325       127        60
OIR    2025130    131400   -9.3500 -138.8600      24.8       324       128        60
OIR    2025130    131400   -9.3500 -138.8700      24.9       324       128        60
OIR    2025130    131400   -9.3500 -138.8800      24.8       324       126        60
OIR    2025130    131400   -9.3500 -138.8900      24.8       324       128        60
OIR    2025130    131400   -9.3500 -138.9000      24.7       324       131        60
OIR    2025130    131400   -9.3500 -138.9100      24.4       323       137        60
OIR    2025130    131400   -9.3500 -138.9200      24.2       323       144        60
OIR    2025130    131400   -9.3500 -138.9300      21.9       320       146        60
OIR    2025130    131400   -9.3500 -138.9400      18.2       318       147        60
OIR    2025130    131400   -9.3500 -138.9500      17.7       317       144        60
OIR    2025130    131400   -9.3500 -138.9600      17.7       317       141        60
OIR    2025130    131400   -9.3500 -138.9700      17.4       317       140        60
OIR    2025130    131400   -9.3500 -138.9800      16.3       319       142        60
OIR    2025130    131400   -9.3500 -138.9900      14.9       322       147        60
OIR    2025130    131400   -9.3600 -136.4000      36.0        82       146        60
OIR    2025130    131400   -9.3600 -136.4100      36.3        82       143        60
OIR    2025130    131400   -9.3600 -136.4200      36.7        82       140        60
OIR    2025130    131400   -9.3600 -136.4300      37.6        81       138        60
OIR    2025130    131400   -9.3600 -136.4400      38.6        81       137        60
OIR    2025130    131400   -9.3600 -136.4500      39.3        80       135        60
OIR    2025130    131400   -9.3600 -136.4600      39.7        80       136        60
OIR    2025130    131400   -9.3600 -136.4700      39.9        80       136        60
OIR    2025130    131400   -9.3600 -136.4800      39.9        80       137        60
OIR    2025130    131400   -9.3600 -136.4900      39.5        81       138        60
OIR    2025130    131400   -9.3600 -136.5000      38.6        81       138        60
OIR    2025130    131400   -9.3600 -136.5100      37.3        82       136        60
OIR    2025130    131400   -9.3600 -136.5200      36.4        82       133        60
OIR    2025130    131400   -9.3600 -136.5300      35.8        82       132        60
OIR    2025130    131400   -9.3600 -136.5400      35.0        82       132        60
OIR    2025130    131400   -9.3600 -136.5500      33.7        82       131        60
OIR    2025130    131400   -9.3600 -136.5600      31.7        81       130        60
OIR    2025130    131400   -9.3600 -136.5700      29.4        79       129        60
OIR    2025130    131400   -9.3600 -136.5800      27.2        76       127        60
OIR    2025130    131400   -9.3600 -136.5900      26.7        75       126        60
OIR    2025130    131400   -9.3600 -136.6000      26.6        75       125        60
OIR    2025130    131400   -9.3600 -136.6100      26.5        75       123        60
OIR    2025130    131400   -9.3600 -136.6200      26.5        75       123        60
OIR    2025130    131400   -9.3600 -136.6300      26.5        75       123        60
OIR    2025130    131400   -9.3600 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.3600 -136.6500      26.4        75       124        60
OIR    2025130    131400   -9.3600 -136.6600      26.4        75       124        60
OIR    2025130    131400   -9.3600 -136.6700      26.3        75       124        60
OIR    2025130    131400   -9.3600 -136.6800      26.3        75       123        60
OIR    2025130    131400   -9.3600 -136.6900      26.3        75       122        60
OIR    2025130    131400   -9.3600 -136.7000      26.2        75       122        60
OIR    2025130    131400   -9.3600 -136.7100      26.2        75       121        60
OIR    2025130    131400   -9.3600 -136.7200      26.2        75       122        60
OIR    2025130    131400   -9.3600 -136.7300      26.1        75       122        60
OIR    2025130    131400   -9.3600 -136.7400      26.1        75       121        60
OIR    2025130    131400   -9.3600 -136.7500      26.1        74       119        60
OIR    2025130    131400   -9.3600 -136.7600      26.1        74       116        60
OIR    2025130    131400   -9.3600 -136.7700      26.0        74       116        60
OIR    2025130    131400   -9.3600 -136.7800      26.0        74       116        60
OIR    2025130    131400   -9.3600 -136.7900      25.9        74       116        60
OIR    2025130    131400   -9.3600 -136.8000      25.8        74       116        60
OIR    2025130    131400   -9.3600 -136.8100      25.7        74       117        60
OIR    2025130    131400   -9.3600 -136.8200      25.7        74       120        60
OIR    2025130    131400   -9.3600 -136.8300      25.6        73       120        60
OIR    2025130    131400   -9.3600 -136.8400      25.6        73       121        60
OIR    2025130    131400   -9.3600 -136.8500      25.6        73       121        60
OIR    2025130    131400   -9.3600 -136.8600      25.6        73       120        60
OIR    2025130    131400   -9.3600 -136.8700      25.7        73       119        60
OIR    2025130    131400   -9.3600 -136.8800      25.8        73       116        60
OIR    2025130    131400   -9.3600 -136.8900      26.0        72       114        60
OIR    2025130    131400   -9.3600 -136.9000      26.3        71       115        60
OIR    2025130    131400   -9.3600 -136.9100      26.6        70       115        60
OIR    2025130    131400   -9.3600 -136.9200      27.1        69       116        60
OIR    2025130    131400   -9.3600 -136.9300      27.5        69       116        60
OIR    2025130    131400   -9.3600 -136.9400      27.8        68       114        60
OIR    2025130    131400   -9.3600 -136.9500      28.0        68       113        60
OIR    2025130    131400   -9.3600 -136.9600      28.2        67       112        60
OIR    2025130    131400   -9.3600 -136.9700      28.4        67       112        60
OIR    2025130    131400   -9.3600 -136.9800      28.4        66       113        60
OIR    2025130    131400   -9.3600 -136.9900      28.5        66       114        60
OIR    2025130    131400   -9.3600 -137.0000      28.5        66       115        60
OIR    2025130    131400   -9.3600 -137.0100      28.5        65       114        60
OIR    2025130    131400   -9.3600 -137.0200      28.6        65       113        60
OIR    2025130    131400   -9.3600 -137.0300      28.6        65       112        60
OIR    2025130    131400   -9.3600 -137.0400      28.6        65       112        60
OIR    2025130    131400   -9.3600 -137.0500      28.6        65       114        60
OIR    2025130    131400   -9.3600 -137.0600      28.6        65       114        60
OIR    2025130    131400   -9.3600 -137.0700      28.6        65       114        60
OIR    2025130    131400   -9.3600 -137.0800      28.6        65       113        60
OIR    2025130    131400   -9.3600 -137.0900      28.6        65       112        60
OIR    2025130    131400   -9.3600 -137.1000      28.6        65       112        60
OIR    2025130    131400   -9.3600 -137.1100      28.6        65       111        60
OIR    2025130    131400   -9.3600 -137.1200      28.6        65       111        60
OIR    2025130    131400   -9.3600 -137.1300      28.6        65       111        60
OIR    2025130    131400   -9.3600 -137.1400      28.6        65       113        60
OIR    2025130    131400   -9.3600 -137.1500      28.6        65       114        60
OIR    2025130    131400   -9.3600 -137.1600      28.6        65       112        60
OIR    2025130    131400   -9.3600 -137.1700      28.6        65       111        60
OIR    2025130    131400   -9.3600 -137.1800      28.5        65       111        60
OIR    2025130    131400   -9.3600 -137.1900      28.3        65       111        60
OIR    2025130    131400   -9.3600 -137.2000      28.2        65       111        60
OIR    2025130    131400   -9.3600 -137.2100      28.1        65       111        60
OIR    2025130    131400   -9.3600 -137.2200      28.0        64       111        60
OIR    2025130    131400   -9.3600 -137.2300      27.9        64       110        60
OIR    2025130    131400   -9.3600 -137.2400      27.7        64       109        60
OIR    2025130    131400   -9.3600 -137.2500      27.5        64       104        60
OIR    2025130    131400   -9.3600 -137.2600      27.5        63       103        60
OIR    2025130    131400   -9.3600 -137.2700      27.4        63       103        60
OIR    2025130    131400   -9.3600 -137.2800      27.4        63       103        60
OIR    2025130    131400   -9.3600 -137.2900      27.3        63       103        60
OIR    2025130    131400   -9.3600 -137.3000      27.3        63       103        60
OIR    2025130    131400   -9.3600 -137.3100      27.3        63       103        60
OIR    2025130    131400   -9.3600 -137.3200      27.2        63       103        60
OIR    2025130    131400   -9.3600 -137.3300      27.1        63       103        60
OIR    2025130    131400   -9.3600 -137.3400      26.3        62       104        60
OIR    2025130    131400   -9.3600 -137.3500      24.8        60       104        60
OIR    2025130    131400   -9.3600 -137.3600      24.2        59       103        60
OIR    2025130    131400   -9.3600 -137.3700      23.6        59       103        60
OIR    2025130    131400   -9.3600 -137.3800      22.5        58       103        60
OIR    2025130    131400   -9.3600 -137.3900      19.8        58       103        60
OIR    2025130    131400   -9.3600 -137.4000      17.7        59       103        60
OIR    2025130    131400   -9.3600 -137.4100      15.7        59       103        60
OIR    2025130    131400   -9.3600 -137.4200      14.4        60       103        60
OIR    2025130    131400   -9.3600 -137.4300      12.8        60       103        60
OIR    2025130    131400   -9.3600 -137.4400       9.4        57       103        60
OIR    2025130    131400   -9.3600 -137.6500       4.3       296       111        60
OIR    2025130    131400   -9.3600 -137.6600       4.8       291       112        60
OIR    2025130    131400   -9.3600 -137.6700       5.2       288       114        60
OIR    2025130    131400   -9.3600 -137.6800       5.4       286       115        60
OIR    2025130    131400   -9.3600 -137.6900       5.5       286       113        60
OIR    2025130    131400   -9.3600 -137.7000       5.6       285       111        60
OIR    2025130    131400   -9.3600 -137.7100       5.7       285       110        60
OIR    2025130    131400   -9.3600 -137.7200       5.7       285       110        60
OIR    2025130    131400   -9.3600 -137.7300       5.8       284       110        60
OIR    2025130    131400   -9.3600 -137.7400       5.8       284       112        60
OIR    2025130    131400   -9.3600 -137.7500       5.8       284       116        60
OIR    2025130    131400   -9.3600 -137.7600       5.9       284       116        60
OIR    2025130    131400   -9.3600 -137.7700       5.9       284       116        60
OIR    2025130    131400   -9.3600 -137.7800       5.9       284       117        60
OIR    2025130    131400   -9.3600 -137.7900       6.0       284       119        60
OIR    2025130    131400   -9.3600 -137.8000       6.0       284       117        60
OIR    2025130    131400   -9.3600 -137.8100       6.1       284       116        60
OIR    2025130    131400   -9.3600 -137.8200       6.2       284       116        60
OIR    2025130    131400   -9.3600 -137.8300       6.4       283       116        60
OIR    2025130    131400   -9.3600 -137.8400       6.8       283       116        60
OIR    2025130    131400   -9.3600 -137.8500       7.3       282       116        60
OIR    2025130    131400   -9.3600 -137.8600       7.9       281       116        60
OIR    2025130    131400   -9.3600 -137.8700       8.5       280       117        60
OIR    2025130    131400   -9.3600 -137.8800       8.9       280       119        60
OIR    2025130    131400   -9.3600 -137.8900       9.1       279       119        60
OIR    2025130    131400   -9.3600 -137.9000       9.2       279       119        60
OIR    2025130    131400   -9.3600 -137.9100       9.4       277       119        60
OIR    2025130    131400   -9.3600 -137.9200       9.5       276       117        60
OIR    2025130    131400   -9.3600 -137.9300       9.8       276       116        60
OIR    2025130    131400   -9.3600 -137.9400      10.0       276       117        60
OIR    2025130    131400   -9.3600 -137.9500      10.2       276       117        60
OIR    2025130    131400   -9.3600 -137.9600      10.3       277       120        60
OIR    2025130    131400   -9.3600 -137.9700      10.5       277       124        60
OIR    2025130    131400   -9.3600 -137.9800      10.5       279       126        60
OIR    2025130    131400   -9.3600 -137.9900      10.5       280       127        60
OIR    2025130    131400   -9.3600 -138.0000      10.4       282       127        60
OIR    2025130    131400   -9.3600 -138.0100      10.3       285       128        60
OIR    2025130    131400   -9.3600 -138.0200      10.3       289       127        60
OIR    2025130    131400   -9.3600 -138.0300      10.3       292       126        60
OIR    2025130    131400   -9.3600 -138.0400      10.2       296       125        60
OIR    2025130    131400   -9.3600 -138.0500      10.7       300       127        60
OIR    2025130    131400   -9.3600 -138.0600      10.9       304       130        60
OIR    2025130    131400   -9.3600 -138.0700      11.1       309       134        60
OIR    2025130    131400   -9.3600 -138.0800      11.2       313       140        60
OIR    2025130    131400   -9.3600 -138.0900      11.5       320       144        60
OIR    2025130    131400   -9.3600 -138.1000      12.2       328       148        60
OIR    2025130    131400   -9.3600 -138.3100      25.2         7       131        60
OIR    2025130    131400   -9.3600 -138.3200      25.8       355       115        60
OIR    2025130    131400   -9.3600 -138.3300      26.0       354       112        60
OIR    2025130    131400   -9.3600 -138.3400      26.2       352       109        60
OIR    2025130    131400   -9.3600 -138.3500      27.1       353       107        60
OIR    2025130    131400   -9.3600 -138.3600      28.5       355       104        60
OIR    2025130    131400   -9.3600 -138.3700      29.6       357       103        60
OIR    2025130    131400   -9.3600 -138.3800      30.1       357       103        60
OIR    2025130    131400   -9.3600 -138.3900      30.3       357       103        60
OIR    2025130    131400   -9.3600 -138.4000      30.4       357       103        60
OIR    2025130    131400   -9.3600 -138.4100      30.5       357       103        60
OIR    2025130    131400   -9.3600 -138.4200      30.6       357       103        60
OIR    2025130    131400   -9.3600 -138.4300      30.7       357       103        60
OIR    2025130    131400   -9.3600 -138.4400      30.8       357       103        60
OIR    2025130    131400   -9.3600 -138.4500      30.9       357       103        60
OIR    2025130    131400   -9.3600 -138.4600      30.9       356       103        60
OIR    2025130    131400   -9.3600 -138.4700      30.9       356       103        60
OIR    2025130    131400   -9.3600 -138.4800      30.9       356       103        60
OIR    2025130    131400   -9.3600 -138.4900      30.9       356       103        60
OIR    2025130    131400   -9.3600 -138.5000      31.0       355       103        60
OIR    2025130    131400   -9.3600 -138.5100      31.1       355       103        60
OIR    2025130    131400   -9.3600 -138.5200      31.1       355       103        60
OIR    2025130    131400   -9.3600 -138.5300      31.1       355       103        60
OIR    2025130    131400   -9.3600 -138.5400      31.0       355       103        60
OIR    2025130    131400   -9.3600 -138.5500      30.8       354       103        60
OIR    2025130    131400   -9.3600 -138.5600      30.7       353       103        60
OIR    2025130    131400   -9.3600 -138.5700      30.5       352       103        60
OIR    2025130    131400   -9.3600 -138.5800      30.2       350       103        60
OIR    2025130    131400   -9.3600 -138.5900      29.9       349       103        60
OIR    2025130    131400   -9.3600 -138.6000      29.8       347       103        60
OIR    2025130    131400   -9.3600 -138.6100      29.9       344       103        60
OIR    2025130    131400   -9.3600 -138.6200      30.1       342       103        60
OIR    2025130    131400   -9.3600 -138.6300      30.4       340       103        60
OIR    2025130    131400   -9.3600 -138.6400      30.7       339       103        60
OIR    2025130    131400   -9.3600 -138.6500      30.8       338       103        60
OIR    2025130    131400   -9.3600 -138.6600      30.9       338       103        60
OIR    2025130    131400   -9.3600 -138.6700      30.9       337       103        60
OIR    2025130    131400   -9.3600 -138.6800      30.9       337       103        60
OIR    2025130    131400   -9.3600 -138.6900      31.0       336       104        60
OIR    2025130    131400   -9.3600 -138.7000      30.9       336       109        60
OIR    2025130    131400   -9.3600 -138.7100      30.8       335       112        60
OIR    2025130    131400   -9.3600 -138.7200      30.1       333       115        60
OIR    2025130    131400   -9.3600 -138.7300      29.0       331       115        60
OIR    2025130    131400   -9.3600 -138.7400      26.3       329       115        60
OIR    2025130    131400   -9.3600 -138.7500      25.8       329       113        60
OIR    2025130    131400   -9.3600 -138.7600      25.6       329       112        60
OIR    2025130    131400   -9.3600 -138.7700      25.5       329       111        60
OIR    2025130    131400   -9.3600 -138.7800      25.3       329       111        60
OIR    2025130    131400   -9.3600 -138.7900      25.0       328       113        60
OIR    2025130    131400   -9.3600 -138.8000      25.0       327       115        60
OIR    2025130    131400   -9.3600 -138.8100      25.0       327       117        60
OIR    2025130    131400   -9.3600 -138.8200      25.0       326       120        60
OIR    2025130    131400   -9.3600 -138.8300      24.9       325       123        60
OIR    2025130    131400   -9.3600 -138.8400      24.8       325       126        60
OIR    2025130    131400   -9.3600 -138.8500      24.8       325       129        60
OIR    2025130    131400   -9.3600 -138.8600      24.9       325       133        60
OIR    2025130    131400   -9.3600 -138.8700      24.9       324       135        60
OIR    2025130    131400   -9.3600 -138.8800      24.9       324       134        60
OIR    2025130    131400   -9.3600 -138.8900      24.8       324       136        60
OIR    2025130    131400   -9.3600 -138.9000      24.8       324       139        60
OIR    2025130    131400   -9.3600 -138.9100      24.4       323       143        60
OIR    2025130    131400   -9.3600 -138.9600      17.7       318       145        60
OIR    2025130    131400   -9.3600 -138.9700      17.3       317       138        60
OIR    2025130    131400   -9.3600 -138.9800      16.4       318       137        60
OIR    2025130    131400   -9.3600 -138.9900      14.9       320       143        60
OIR    2025130    131400   -9.3700 -136.4000      36.6        81       144        60
OIR    2025130    131400   -9.3700 -136.4100      36.9        82       142        60
OIR    2025130    131400   -9.3700 -136.4200      37.4        81       140        60
OIR    2025130    131400   -9.3700 -136.4300      38.5        80       138        60
OIR    2025130    131400   -9.3700 -136.4400      39.4        80       136        60
OIR    2025130    131400   -9.3700 -136.4500      39.8        80       134        60
OIR    2025130    131400   -9.3700 -136.4600      40.0        80       135        60
OIR    2025130    131400   -9.3700 -136.4700      40.0        80       135        60
OIR    2025130    131400   -9.3700 -136.4800      40.0        80       137        60
OIR    2025130    131400   -9.3700 -136.4900      39.9        80       138        60
OIR    2025130    131400   -9.3700 -136.5000      39.5        80       140        60
OIR    2025130    131400   -9.3700 -136.5100      38.3        81       138        60
OIR    2025130    131400   -9.3700 -136.5200      37.0        82       135        60
OIR    2025130    131400   -9.3700 -136.5300      36.2        81       132        60
OIR    2025130    131400   -9.3700 -136.5400      35.3        81       132        60
OIR    2025130    131400   -9.3700 -136.5500      33.7        81       130        60
OIR    2025130    131400   -9.3700 -136.5600      31.2        79       129        60
OIR    2025130    131400   -9.3700 -136.5700      28.7        78       128        60
OIR    2025130    131400   -9.3700 -136.5800      26.9        76       127        60
OIR    2025130    131400   -9.3700 -136.5900      26.6        75       126        60
OIR    2025130    131400   -9.3700 -136.6000      26.6        75       124        60
OIR    2025130    131400   -9.3700 -136.6100      26.5        75       123        60
OIR    2025130    131400   -9.3700 -136.6200      26.5        75       123        60
OIR    2025130    131400   -9.3700 -136.6300      26.5        75       123        60
OIR    2025130    131400   -9.3700 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.3700 -136.6500      26.4        75       124        60
OIR    2025130    131400   -9.3700 -136.6600      26.4        75       124        60
OIR    2025130    131400   -9.3700 -136.6700      26.4        75       123        60
OIR    2025130    131400   -9.3700 -136.6800      26.3        75       122        60
OIR    2025130    131400   -9.3700 -136.6900      26.3        75       121        60
OIR    2025130    131400   -9.3700 -136.7000      26.3        75       120        60
OIR    2025130    131400   -9.3700 -136.7100      26.2        75       120        60
OIR    2025130    131400   -9.3700 -136.7200      26.2        75       120        60
OIR    2025130    131400   -9.3700 -136.7300      26.2        74       120        60
OIR    2025130    131400   -9.3700 -136.7400      26.1        74       120        60
OIR    2025130    131400   -9.3700 -136.7500      26.1        74       117        60
OIR    2025130    131400   -9.3700 -136.7600      26.1        74       114        60
OIR    2025130    131400   -9.3700 -136.7700      26.0        74       114        60
OIR    2025130    131400   -9.3700 -136.7800      26.0        74       114        60
OIR    2025130    131400   -9.3700 -136.7900      25.9        74       113        60
OIR    2025130    131400   -9.3700 -136.8000      25.8        74       112        60
OIR    2025130    131400   -9.3700 -136.8100      25.7        74       115        60
OIR    2025130    131400   -9.3700 -136.8200      25.7        73       116        60
OIR    2025130    131400   -9.3700 -136.8300      25.6        73       116        60
OIR    2025130    131400   -9.3700 -136.8400      25.6        73       117        60
OIR    2025130    131400   -9.3700 -136.8500      25.6        73       117        60
OIR    2025130    131400   -9.3700 -136.8600      25.6        73       117        60
OIR    2025130    131400   -9.3700 -136.8700      25.7        73       116        60
OIR    2025130    131400   -9.3700 -136.8800      25.9        72       115        60
OIR    2025130    131400   -9.3700 -136.8900      26.1        71       114        60
OIR    2025130    131400   -9.3700 -136.9000      26.4        70       113        60
OIR    2025130    131400   -9.3700 -136.9100      26.9        69       112        60
OIR    2025130    131400   -9.3700 -136.9200      27.4        69       114        60
OIR    2025130    131400   -9.3700 -136.9300      27.7        68       115        60
OIR    2025130    131400   -9.3700 -136.9400      28.0        67       115        60
OIR    2025130    131400   -9.3700 -136.9500      28.2        67       114        60
OIR    2025130    131400   -9.3700 -136.9600      28.4        67       112        60
OIR    2025130    131400   -9.3700 -136.9700      28.5        66       112        60
OIR    2025130    131400   -9.3700 -136.9800      28.5        66       113        60
OIR    2025130    131400   -9.3700 -136.9900      28.5        66       114        60
OIR    2025130    131400   -9.3700 -137.0000      28.6        65       115        60
OIR    2025130    131400   -9.3700 -137.0100      28.6        65       115        60
OIR    2025130    131400   -9.3700 -137.0200      28.6        65       114        60
OIR    2025130    131400   -9.3700 -137.0300      28.6        65       113        60
OIR    2025130    131400   -9.3700 -137.0400      28.6        65       113        60
OIR    2025130    131400   -9.3700 -137.0500      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.0600      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.0700      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.0800      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.0900      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.1000      28.6        65       110        60
OIR    2025130    131400   -9.3700 -137.1100      28.6        65       108        60
OIR    2025130    131400   -9.3700 -137.1200      28.6        65       108        60
OIR    2025130    131400   -9.3700 -137.1300      28.7        65       109        60
OIR    2025130    131400   -9.3700 -137.1400      28.7        65       113        60
OIR    2025130    131400   -9.3700 -137.1500      28.6        65       114        60
OIR    2025130    131400   -9.3700 -137.1600      28.6        65       112        60
OIR    2025130    131400   -9.3700 -137.1700      28.6        65       110        60
OIR    2025130    131400   -9.3700 -137.1800      28.5        65       109        60
OIR    2025130    131400   -9.3700 -137.1900      28.3        65       109        60
OIR    2025130    131400   -9.3700 -137.2000      28.2        65       112        60
OIR    2025130    131400   -9.3700 -137.2100      28.1        64       112        60
OIR    2025130    131400   -9.3700 -137.2200      28.0        64       111        60
OIR    2025130    131400   -9.3700 -137.2300      27.8        64       110        60
OIR    2025130    131400   -9.3700 -137.2400      27.7        64       108        60
OIR    2025130    131400   -9.3700 -137.2500      27.6        63       104        60
OIR    2025130    131400   -9.3700 -137.2600      27.5        63       103        60
OIR    2025130    131400   -9.3700 -137.2700      27.5        63       103        60
OIR    2025130    131400   -9.3700 -137.2800      27.4        63       103        60
OIR    2025130    131400   -9.3700 -137.2900      27.4        63       103        60
OIR    2025130    131400   -9.3700 -137.3000      27.4        63       103        60
OIR    2025130    131400   -9.3700 -137.3100      27.3        63       103        60
OIR    2025130    131400   -9.3700 -137.3200      27.3        63       103        60
OIR    2025130    131400   -9.3700 -137.3300      27.2        63       103        60
OIR    2025130    131400   -9.3700 -137.3400      26.3        62       104        60
OIR    2025130    131400   -9.3700 -137.3500      24.7        60       104        60
OIR    2025130    131400   -9.3700 -137.3600      24.3        60       104        60
OIR    2025130    131400   -9.3700 -137.3700      23.6        59       103        60
OIR    2025130    131400   -9.3700 -137.3800      22.6        59       103        60
OIR    2025130    131400   -9.3700 -137.3900      20.0        59       103        60
OIR    2025130    131400   -9.3700 -137.4000      17.9        60       103        60
OIR    2025130    131400   -9.3700 -137.4100      16.1        61       103        60
OIR    2025130    131400   -9.3700 -137.4200      14.9        61       103        60
OIR    2025130    131400   -9.3700 -137.4300      13.4        61       103        60
OIR    2025130    131400   -9.3700 -137.4400      10.0        59       103        60
OIR    2025130    131400   -9.3700 -137.4500       4.2        37       103        60
OIR    2025130    131400   -9.3700 -137.6500       4.2       296       109        60
OIR    2025130    131400   -9.3700 -137.6600       4.8       290       111        60
OIR    2025130    131400   -9.3700 -137.6700       5.2       288       112        60
OIR    2025130    131400   -9.3700 -137.6800       5.4       287       114        60
OIR    2025130    131400   -9.3700 -137.6900       5.5       286       112        60
OIR    2025130    131400   -9.3700 -137.7000       5.6       286       110        60
OIR    2025130    131400   -9.3700 -137.7100       5.7       285       110        60
OIR    2025130    131400   -9.3700 -137.7200       5.7       285       109        60
OIR    2025130    131400   -9.3700 -137.7300       5.7       285       109        60
OIR    2025130    131400   -9.3700 -137.7400       5.8       285       111        60
OIR    2025130    131400   -9.3700 -137.7500       5.8       284       114        60
OIR    2025130    131400   -9.3700 -137.7600       5.9       284       115        60
OIR    2025130    131400   -9.3700 -137.7700       5.9       284       116        60
OIR    2025130    131400   -9.3700 -137.7800       6.0       284       116        60
OIR    2025130    131400   -9.3700 -137.7900       6.0       284       116        60
OIR    2025130    131400   -9.3700 -137.8000       6.0       284       116        60
OIR    2025130    131400   -9.3700 -137.8100       6.2       284       115        60
OIR    2025130    131400   -9.3700 -137.8200       6.4       284       115        60
OIR    2025130    131400   -9.3700 -137.8300       6.9       283       115        60
OIR    2025130    131400   -9.3700 -137.8400       7.6       282       115        60
OIR    2025130    131400   -9.3700 -137.8500       8.2       281       115        60
OIR    2025130    131400   -9.3700 -137.8600       8.8       280       115        60
OIR    2025130    131400   -9.3700 -137.8700       9.2       279       115        60
OIR    2025130    131400   -9.3700 -137.8800       9.3       279       115        60
OIR    2025130    131400   -9.3700 -137.8900       9.4       279       115        60
OIR    2025130    131400   -9.3700 -137.9000       9.5       279       115        60
OIR    2025130    131400   -9.3700 -137.9100       9.6       278       116        60
OIR    2025130    131400   -9.3700 -137.9200       9.8       277       115        60
OIR    2025130    131400   -9.3700 -137.9300      10.0       277       114        60
OIR    2025130    131400   -9.3700 -137.9400      10.4       277       115        60
OIR    2025130    131400   -9.3700 -137.9500      10.6       277       116        60
OIR    2025130    131400   -9.3700 -137.9600      10.9       278       119        60
OIR    2025130    131400   -9.3700 -137.9700      11.0       279       123        60
OIR    2025130    131400   -9.3700 -137.9800      11.0       280       124        60
OIR    2025130    131400   -9.3700 -137.9900      11.0       282       124        60
OIR    2025130    131400   -9.3700 -138.0000      10.9       285       124        60
OIR    2025130    131400   -9.3700 -138.0100      10.8       289       124        60
OIR    2025130    131400   -9.3700 -138.0200      10.8       292       123        60
OIR    2025130    131400   -9.3700 -138.0300      10.8       296       121        60
OIR    2025130    131400   -9.3700 -138.0400      10.8       301       121        60
OIR    2025130    131400   -9.3700 -138.0500      11.1       305       124        60
OIR    2025130    131400   -9.3700 -138.0600      11.5       308       127        60
OIR    2025130    131400   -9.3700 -138.0700      11.6       311       131        60
OIR    2025130    131400   -9.3700 -138.0800      11.8       315       136        60
OIR    2025130    131400   -9.3700 -138.0900      12.1       321       141        60
OIR    2025130    131400   -9.3700 -138.1000      12.7       328       146        60
OIR    2025130    131400   -9.3700 -138.3100      24.9         7       132        60
OIR    2025130    131400   -9.3700 -138.3200      25.7       354       115        60
OIR    2025130    131400   -9.3700 -138.3300      25.8       353       110        60
OIR    2025130    131400   -9.3700 -138.3400      25.9       352       108        60
OIR    2025130    131400   -9.3700 -138.3500      26.0       351       105        60
OIR    2025130    131400   -9.3700 -138.3600      26.8       352       104        60
OIR    2025130    131400   -9.3700 -138.3700      28.2       354       103        60
OIR    2025130    131400   -9.3700 -138.3800      29.6       356       103        60
OIR    2025130    131400   -9.3700 -138.3900      30.2       357       103        60
OIR    2025130    131400   -9.3700 -138.4000      30.4       357       103        60
OIR    2025130    131400   -9.3700 -138.4100      30.5       357       103        60
OIR    2025130    131400   -9.3700 -138.4200      30.7       357       103        60
OIR    2025130    131400   -9.3700 -138.4300      30.9       357       103        60
OIR    2025130    131400   -9.3700 -138.4400      31.1       356       103        60
OIR    2025130    131400   -9.3700 -138.4500      31.2       356       103        60
OIR    2025130    131400   -9.3700 -138.4600      31.2       356       103        60
OIR    2025130    131400   -9.3700 -138.4700      31.2       356       103        60
OIR    2025130    131400   -9.3700 -138.4800      31.2       356       103        60
OIR    2025130    131400   -9.3700 -138.4900      31.3       355       103        60
OIR    2025130    131400   -9.3700 -138.5000      31.3       355       103        60
OIR    2025130    131400   -9.3700 -138.5100      31.3       355       103        60
OIR    2025130    131400   -9.3700 -138.5200      31.3       355       103        60
OIR    2025130    131400   -9.3700 -138.5300      31.3       355       103        60
OIR    2025130    131400   -9.3700 -138.5400      31.2       355       103        60
OIR    2025130    131400   -9.3700 -138.5500      31.1       354       103        60
OIR    2025130    131400   -9.3700 -138.5600      30.9       354       103        60
OIR    2025130    131400   -9.3700 -138.5700      30.7       352       103        60
OIR    2025130    131400   -9.3700 -138.5800      30.2       350       103        60
OIR    2025130    131400   -9.3700 -138.5900      29.8       348       103        60
OIR    2025130    131400   -9.3700 -138.6000      29.7       346       103        60
OIR    2025130    131400   -9.3700 -138.6100      29.9       343       103        60
OIR    2025130    131400   -9.3700 -138.6200      30.2       341       103        60
OIR    2025130    131400   -9.3700 -138.6300      30.6       339       103        60
OIR    2025130    131400   -9.3700 -138.6400      30.9       338       103        60
OIR    2025130    131400   -9.3700 -138.6500      31.0       338       103        60
OIR    2025130    131400   -9.3700 -138.6600      31.1       338       103        60
OIR    2025130    131400   -9.3700 -138.6700      31.1       337       103        60
OIR    2025130    131400   -9.3700 -138.6800      31.1       337       103        60
OIR    2025130    131400   -9.3700 -138.6900      31.0       336       105        60
OIR    2025130    131400   -9.3700 -138.7000      31.0       336       111        60
OIR    2025130    131400   -9.3700 -138.7100      30.9       335       114        60
OIR    2025130    131400   -9.3700 -138.7200      29.9       333       116        60
OIR    2025130    131400   -9.3700 -138.7300      27.7       330       116        60
OIR    2025130    131400   -9.3700 -138.7400      26.1       330       116        60
OIR    2025130    131400   -9.3700 -138.7500      25.8       330       115        60
OIR    2025130    131400   -9.3700 -138.7600      25.7       330       114        60
OIR    2025130    131400   -9.3700 -138.7700      25.6       330       115        60
OIR    2025130    131400   -9.3700 -138.7800      25.5       329       116        60
OIR    2025130    131400   -9.3700 -138.7900      25.3       329       116        60
OIR    2025130    131400   -9.3700 -138.8000      25.3       328       117        60
OIR    2025130    131400   -9.3700 -138.8100      25.2       327       119        60
OIR    2025130    131400   -9.3700 -138.8200      25.1       326       122        60
OIR    2025130    131400   -9.3700 -138.8300      25.0       326       126        60
OIR    2025130    131400   -9.3700 -138.8400      25.0       325       129        60
OIR    2025130    131400   -9.3700 -138.8500      24.9       325       133        60
OIR    2025130    131400   -9.3700 -138.8600      25.0       325       140        60
OIR    2025130    131400   -9.3700 -138.8700      25.0       324       146        60
OIR    2025130    131400   -9.3700 -138.9700      17.1       316       139        60
OIR    2025130    131400   -9.3700 -138.9800      16.4       316       135        60
OIR    2025130    131400   -9.3700 -138.9900      14.7       318       140        60
OIR    2025130    131400   -9.3700 -139.0000      13.9       319       147        60
OIR    2025130    131400   -9.3800 -136.2800      39.5        76       146        60
OIR    2025130    131400   -9.3800 -136.2900      39.5        76       145        60
OIR    2025130    131400   -9.3800 -136.3000      39.5        76       145        60
OIR    2025130    131400   -9.3800 -136.3100      39.5        76       144        60
OIR    2025130    131400   -9.3800 -136.3200      39.5        76       145        60
OIR    2025130    131400   -9.3800 -136.3900      37.4        80       146        60
OIR    2025130    131400   -9.3800 -136.4000      37.9        80       143        60
OIR    2025130    131400   -9.3800 -136.4100      38.3        80       142        60
OIR    2025130    131400   -9.3800 -136.4200      38.8        80       141        60
OIR    2025130    131400   -9.3800 -136.4300      39.5        80       138        60
OIR    2025130    131400   -9.3800 -136.4400      39.9        79       136        60
OIR    2025130    131400   -9.3800 -136.4500      40.0        79       134        60
OIR    2025130    131400   -9.3800 -136.4600      40.0        79       134        60
OIR    2025130    131400   -9.3800 -136.4700      40.0        79       135        60
OIR    2025130    131400   -9.3800 -136.4800      40.0        79       136        60
OIR    2025130    131400   -9.3800 -136.4900      40.0        79       138        60
OIR    2025130    131400   -9.3800 -136.5000      39.9        80       141        60
OIR    2025130    131400   -9.3800 -136.5100      39.3        80       140        60
OIR    2025130    131400   -9.3800 -136.5200      38.1        80       136        60
OIR    2025130    131400   -9.3800 -136.5300      36.9        80       134        60
OIR    2025130    131400   -9.3800 -136.5400      35.8        80       132        60
OIR    2025130    131400   -9.3800 -136.5500      34.1        80       130        60
OIR    2025130    131400   -9.3800 -136.5600      30.9        79       129        60
OIR    2025130    131400   -9.3800 -136.5700      28.1        77       128        60
OIR    2025130    131400   -9.3800 -136.5800      26.8        75       127        60
OIR    2025130    131400   -9.3800 -136.5900      26.6        75       125        60
OIR    2025130    131400   -9.3800 -136.6000      26.6        75       124        60
OIR    2025130    131400   -9.3800 -136.6100      26.5        75       123        60
OIR    2025130    131400   -9.3800 -136.6200      26.5        75       123        60
OIR    2025130    131400   -9.3800 -136.6300      26.5        75       123        60
OIR    2025130    131400   -9.3800 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.3800 -136.6500      26.5        75       124        60
OIR    2025130    131400   -9.3800 -136.6600      26.4        75       123        60
OIR    2025130    131400   -9.3800 -136.6700      26.4        75       122        60
OIR    2025130    131400   -9.3800 -136.6800      26.3        75       121        60
OIR    2025130    131400   -9.3800 -136.6900      26.3        75       120        60
OIR    2025130    131400   -9.3800 -136.7000      26.3        75       119        60
OIR    2025130    131400   -9.3800 -136.7100      26.2        75       119        60
OIR    2025130    131400   -9.3800 -136.7200      26.2        74       119        60
OIR    2025130    131400   -9.3800 -136.7300      26.2        74       119        60
OIR    2025130    131400   -9.3800 -136.7400      26.1        74       119        60
OIR    2025130    131400   -9.3800 -136.7500      26.1        74       116        60
OIR    2025130    131400   -9.3800 -136.7600      26.1        74       113        60
OIR    2025130    131400   -9.3800 -136.7700      26.0        74       112        60
OIR    2025130    131400   -9.3800 -136.7800      26.0        74       111        60
OIR    2025130    131400   -9.3800 -136.7900      25.9        74       110        60
OIR    2025130    131400   -9.3800 -136.8000      25.8        74       109        60
OIR    2025130    131400   -9.3800 -136.8100      25.7        73       112        60
OIR    2025130    131400   -9.3800 -136.8200      25.7        73       115        60
OIR    2025130    131400   -9.3800 -136.8300      25.7        73       115        60
OIR    2025130    131400   -9.3800 -136.8400      25.6        73       116        60
OIR    2025130    131400   -9.3800 -136.8500      25.6        73       116        60
OIR    2025130    131400   -9.3800 -136.8600      25.7        73       116        60
OIR    2025130    131400   -9.3800 -136.8700      25.7        73       115        60
OIR    2025130    131400   -9.3800 -136.8800      25.9        72       114        60
OIR    2025130    131400   -9.3800 -136.8900      26.2        71       113        60
OIR    2025130    131400   -9.3800 -136.9000      26.6        70       112        60
OIR    2025130    131400   -9.3800 -136.9100      27.1        69       111        60
OIR    2025130    131400   -9.3800 -136.9200      27.6        68       114        60
OIR    2025130    131400   -9.3800 -136.9300      27.9        67       116        60
OIR    2025130    131400   -9.3800 -136.9400      28.1        67       116        60
OIR    2025130    131400   -9.3800 -136.9500      28.3        67       115        60
OIR    2025130    131400   -9.3800 -136.9600      28.4        66       113        60
OIR    2025130    131400   -9.3800 -136.9700      28.5        66       113        60
OIR    2025130    131400   -9.3800 -136.9800      28.6        66       113        60
OIR    2025130    131400   -9.3800 -136.9900      28.6        65       113        60
OIR    2025130    131400   -9.3800 -137.0000      28.6        65       114        60
OIR    2025130    131400   -9.3800 -137.0100      28.6        65       114        60
OIR    2025130    131400   -9.3800 -137.0200      28.6        65       114        60
OIR    2025130    131400   -9.3800 -137.0300      28.6        65       113        60
OIR    2025130    131400   -9.3800 -137.0400      28.6        65       112        60
OIR    2025130    131400   -9.3800 -137.0500      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.0600      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.0700      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.0800      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.0900      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.1000      28.6        65       109        60
OIR    2025130    131400   -9.3800 -137.1100      28.7        65       105        60
OIR    2025130    131400   -9.3800 -137.1200      28.7        65       108        60
OIR    2025130    131400   -9.3800 -137.1300      28.7        65       109        60
OIR    2025130    131400   -9.3800 -137.1400      28.7        65       113        60
OIR    2025130    131400   -9.3800 -137.1500      28.7        65       115        60
OIR    2025130    131400   -9.3800 -137.1600      28.6        65       114        60
OIR    2025130    131400   -9.3800 -137.1700      28.6        65       111        60
OIR    2025130    131400   -9.3800 -137.1800      28.5        65       109        60
OIR    2025130    131400   -9.3800 -137.1900      28.3        65       109        60
OIR    2025130    131400   -9.3800 -137.2000      28.2        64       112        60
OIR    2025130    131400   -9.3800 -137.2100      28.1        64       112        60
OIR    2025130    131400   -9.3800 -137.2200      28.0        64       111        60
OIR    2025130    131400   -9.3800 -137.2300      27.8        64       109        60
OIR    2025130    131400   -9.3800 -137.2400      27.7        64       107        60
OIR    2025130    131400   -9.3800 -137.2500      27.6        63       104        60
OIR    2025130    131400   -9.3800 -137.2600      27.5        63       103        60
OIR    2025130    131400   -9.3800 -137.2700      27.5        63       103        60
OIR    2025130    131400   -9.3800 -137.2800      27.5        63       103        60
OIR    2025130    131400   -9.3800 -137.2900      27.4        63       103        60
OIR    2025130    131400   -9.3800 -137.3000      27.4        63       103        60
OIR    2025130    131400   -9.3800 -137.3100      27.4        63       103        60
OIR    2025130    131400   -9.3800 -137.3200      27.3        63       103        60
OIR    2025130    131400   -9.3800 -137.3300      27.2        63       103        60
OIR    2025130    131400   -9.3800 -137.3400      26.6        62       104        60
OIR    2025130    131400   -9.3800 -137.3500      24.8        60       104        60
OIR    2025130    131400   -9.3800 -137.3600      24.4        60       104        60
OIR    2025130    131400   -9.3800 -137.3700      23.6        60       103        60
OIR    2025130    131400   -9.3800 -137.3800      22.5        60       103        60
OIR    2025130    131400   -9.3800 -137.3900      20.2        60       103        60
OIR    2025130    131400   -9.3800 -137.4000      18.3        61       103        60
OIR    2025130    131400   -9.3800 -137.4100      16.7        62       103        60
OIR    2025130    131400   -9.3800 -137.4200      15.4        62       103        60
OIR    2025130    131400   -9.3800 -137.4300      14.0        63       103        60
OIR    2025130    131400   -9.3800 -137.4400      11.2        62       103        60
OIR    2025130    131400   -9.3800 -137.4500       5.3        49       103        60
OIR    2025130    131400   -9.3800 -137.6500       4.0       299       108        60
OIR    2025130    131400   -9.3800 -137.6600       4.6       292       109        60
OIR    2025130    131400   -9.3800 -137.6700       5.1       288       111        60
OIR    2025130    131400   -9.3800 -137.6800       5.4       287       113        60
OIR    2025130    131400   -9.3800 -137.6900       5.5       286       111        60
OIR    2025130    131400   -9.3800 -137.7000       5.6       286       110        60
OIR    2025130    131400   -9.3800 -137.7100       5.6       286       108        60
OIR    2025130    131400   -9.3800 -137.7200       5.7       285       108        60
OIR    2025130    131400   -9.3800 -137.7300       5.7       285       109        60
OIR    2025130    131400   -9.3800 -137.7400       5.8       285       110        60
OIR    2025130    131400   -9.3800 -137.7500       5.8       285       113        60
OIR    2025130    131400   -9.3800 -137.7600       5.9       285       114        60
OIR    2025130    131400   -9.3800 -137.7700       5.9       285       115        60
OIR    2025130    131400   -9.3800 -137.7800       6.0       285       115        60
OIR    2025130    131400   -9.3800 -137.7900       6.0       285       116        60
OIR    2025130    131400   -9.3800 -137.8000       6.1       284       115        60
OIR    2025130    131400   -9.3800 -137.8100       6.4       284       114        60
OIR    2025130    131400   -9.3800 -137.8200       6.9       283       113        60
OIR    2025130    131400   -9.3800 -137.8300       7.7       282       113        60
OIR    2025130    131400   -9.3800 -137.8400       8.5       281       113        60
OIR    2025130    131400   -9.3800 -137.8500       9.0       280       113        60
OIR    2025130    131400   -9.3800 -137.8600       9.3       279       114        60
OIR    2025130    131400   -9.3800 -137.8700       9.4       279       113        60
OIR    2025130    131400   -9.3800 -137.8800       9.5       279       113        60
OIR    2025130    131400   -9.3800 -137.8900       9.5       279       112        60
OIR    2025130    131400   -9.3800 -137.9000       9.6       279       112        60
OIR    2025130    131400   -9.3800 -137.9100       9.7       279       114        60
OIR    2025130    131400   -9.3800 -137.9200       9.9       278       114        60
OIR    2025130    131400   -9.3800 -137.9300      10.3       278       113        60
OIR    2025130    131400   -9.3800 -137.9400      10.7       278       114        60
OIR    2025130    131400   -9.3800 -137.9500      11.0       279       115        60
OIR    2025130    131400   -9.3800 -137.9600      11.2       280       116        60
OIR    2025130    131400   -9.3800 -137.9700      11.4       281       121        60
OIR    2025130    131400   -9.3800 -137.9800      11.5       283       122        60
OIR    2025130    131400   -9.3800 -137.9900      11.5       285       122        60
OIR    2025130    131400   -9.3800 -138.0000      11.6       290       122        60
OIR    2025130    131400   -9.3800 -138.0100      11.6       294       121        60
OIR    2025130    131400   -9.3800 -138.0200      11.7       298       119        60
OIR    2025130    131400   -9.3800 -138.0300      11.6       302       117        60
OIR    2025130    131400   -9.3800 -138.0400      11.6       307       119        60
OIR    2025130    131400   -9.3800 -138.0500      11.8       310       121        60
OIR    2025130    131400   -9.3800 -138.0600      12.3       312       125        60
OIR    2025130    131400   -9.3800 -138.0700      12.6       314       129        60
OIR    2025130    131400   -9.3800 -138.0800      12.6       317       134        60
OIR    2025130    131400   -9.3800 -138.0900      12.9       323       139        60
OIR    2025130    131400   -9.3800 -138.1000      13.4       327       144        60
OIR    2025130    131400   -9.3800 -138.1100      13.7       330       148        60
OIR    2025130    131400   -9.3800 -138.3100      24.6         7       141        60
OIR    2025130    131400   -9.3800 -138.3200      25.7       353       125        60
OIR    2025130    131400   -9.3800 -138.3300      25.7       352       115        60
OIR    2025130    131400   -9.3800 -138.3400      25.8       351       111        60
OIR    2025130    131400   -9.3800 -138.3500      25.8       351       108        60
OIR    2025130    131400   -9.3800 -138.3600      25.9       351       105        60
OIR    2025130    131400   -9.3800 -138.3700      26.3       351       104        60
OIR    2025130    131400   -9.3800 -138.3800      27.5       353       103        60
OIR    2025130    131400   -9.3800 -138.3900      29.2       355       103        60
OIR    2025130    131400   -9.3800 -138.4000      30.1       357       103        60
OIR    2025130    131400   -9.3800 -138.4100      30.5       357       103        60
OIR    2025130    131400   -9.3800 -138.4200      30.7       357       103        60
OIR    2025130    131400   -9.3800 -138.4300      31.0       356       103        60
OIR    2025130    131400   -9.3800 -138.4400      31.2       356       103        60
OIR    2025130    131400   -9.3800 -138.4500      31.3       356       103        60
OIR    2025130    131400   -9.3800 -138.4600      31.3       356       103        60
OIR    2025130    131400   -9.3800 -138.4700      31.3       356       103        60
OIR    2025130    131400   -9.3800 -138.4800      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.4900      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5000      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5100      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5200      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5300      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5400      31.3       355       103        60
OIR    2025130    131400   -9.3800 -138.5500      31.2       355       103        60
OIR    2025130    131400   -9.3800 -138.5600      31.1       354       103        60
OIR    2025130    131400   -9.3800 -138.5700      30.7       353       103        60
OIR    2025130    131400   -9.3800 -138.5800      30.0       350       103        60
OIR    2025130    131400   -9.3800 -138.5900      29.5       348       103        60
OIR    2025130    131400   -9.3800 -138.6000      29.5       344       103        60
OIR    2025130    131400   -9.3800 -138.6100      29.9       342       103        60
OIR    2025130    131400   -9.3800 -138.6200      30.3       340       103        60
OIR    2025130    131400   -9.3800 -138.6300      30.8       339       103        60
OIR    2025130    131400   -9.3800 -138.6400      31.2       338       103        60
OIR    2025130    131400   -9.3800 -138.6500      31.4       338       103        60
OIR    2025130    131400   -9.3800 -138.6600      31.4       337       103        60
OIR    2025130    131400   -9.3800 -138.6700      31.4       337       104        60
OIR    2025130    131400   -9.3800 -138.6800      31.3       337       104        60
OIR    2025130    131400   -9.3800 -138.6900      31.1       336       108        60
OIR    2025130    131400   -9.3800 -138.7000      31.0       336       114        60
OIR    2025130    131400   -9.3800 -138.7100      30.5       335       117        60
OIR    2025130    131400   -9.3800 -138.7200      28.8       333       122        60
OIR    2025130    131400   -9.3800 -138.7300      26.9       331       123        60
OIR    2025130    131400   -9.3800 -138.7400      26.1       330       124        60
OIR    2025130    131400   -9.3800 -138.7500      25.9       330       123        60
OIR    2025130    131400   -9.3800 -138.7600      25.8       330       122        60
OIR    2025130    131400   -9.3800 -138.7700      25.7       330       123        60
OIR    2025130    131400   -9.3800 -138.7800      25.6       330       123        60
OIR    2025130    131400   -9.3800 -138.7900      25.5       329       123        60
OIR    2025130    131400   -9.3800 -138.8000      25.5       329       124        60
OIR    2025130    131400   -9.3800 -138.8100      25.4       328       124        60
OIR    2025130    131400   -9.3800 -138.8200      25.2       326       126        60
OIR    2025130    131400   -9.3800 -138.8300      25.3       326       129        60
OIR    2025130    131400   -9.3800 -138.8400      25.2       325       135        60
OIR    2025130    131400   -9.3800 -138.8500      25.1       325       142        60
OIR    2025130    131400   -9.3800 -138.9700      17.2       315       140        60
OIR    2025130    131400   -9.3800 -138.9800      16.3       315       137        60
OIR    2025130    131400   -9.3800 -138.9900      14.7       317       144        60
OIR    2025130    131400   -9.3900 -136.2700      39.5        76       145        60
OIR    2025130    131400   -9.3900 -136.2800      39.5        76       144        60
OIR    2025130    131400   -9.3900 -136.2900      39.5        76       143        60
OIR    2025130    131400   -9.3900 -136.3000      39.5        76       143        60
OIR    2025130    131400   -9.3900 -136.3100      39.5        76       142        60
OIR    2025130    131400   -9.3900 -136.3200      39.6        76       142        60
OIR    2025130    131400   -9.3900 -136.3300      39.6        76       143        60
OIR    2025130    131400   -9.3900 -136.3400      39.6        76       144        60
OIR    2025130    131400   -9.3900 -136.3500      39.6        76       146        60
OIR    2025130    131400   -9.3900 -136.3900      39.0        79       146        60
OIR    2025130    131400   -9.3900 -136.4000      39.1        80       144        60
OIR    2025130    131400   -9.3900 -136.4100      39.2        80       144        60
OIR    2025130    131400   -9.3900 -136.4200      39.6        80       142        60
OIR    2025130    131400   -9.3900 -136.4300      39.9        79       140        60
OIR    2025130    131400   -9.3900 -136.4400      40.0        79       137        60
OIR    2025130    131400   -9.3900 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.3900 -136.4600      40.0        79       134        60
OIR    2025130    131400   -9.3900 -136.4700      40.0        79       135        60
OIR    2025130    131400   -9.3900 -136.4800      40.0        79       136        60
OIR    2025130    131400   -9.3900 -136.4900      40.0        79       137        60
OIR    2025130    131400   -9.3900 -136.5000      40.0        79       139        60
OIR    2025130    131400   -9.3900 -136.5100      39.7        80       140        60
OIR    2025130    131400   -9.3900 -136.5200      39.0        80       139        60
OIR    2025130    131400   -9.3900 -136.5300      38.0        80       137        60
OIR    2025130    131400   -9.3900 -136.5400      36.3        80       132        60
OIR    2025130    131400   -9.3900 -136.5500      34.4        79       130        60
OIR    2025130    131400   -9.3900 -136.5600      31.2        78       129        60
OIR    2025130    131400   -9.3900 -136.5700      27.6        76       128        60
OIR    2025130    131400   -9.3900 -136.5800      26.7        75       127        60
OIR    2025130    131400   -9.3900 -136.5900      26.6        75       126        60
OIR    2025130    131400   -9.3900 -136.6000      26.6        75       125        60
OIR    2025130    131400   -9.3900 -136.6100      26.6        75       124        60
OIR    2025130    131400   -9.3900 -136.6200      26.5        75       124        60
OIR    2025130    131400   -9.3900 -136.6300      26.5        75       124        60
OIR    2025130    131400   -9.3900 -136.6400      26.5        75       123        60
OIR    2025130    131400   -9.3900 -136.6500      26.5        75       122        60
OIR    2025130    131400   -9.3900 -136.6600      26.4        75       121        60
OIR    2025130    131400   -9.3900 -136.6700      26.4        75       121        60
OIR    2025130    131400   -9.3900 -136.6800      26.4        75       120        60
OIR    2025130    131400   -9.3900 -136.6900      26.3        75       119        60
OIR    2025130    131400   -9.3900 -136.7000      26.3        75       119        60
OIR    2025130    131400   -9.3900 -136.7100      26.2        75       117        60
OIR    2025130    131400   -9.3900 -136.7200      26.2        74       117        60
OIR    2025130    131400   -9.3900 -136.7300      26.2        74       117        60
OIR    2025130    131400   -9.3900 -136.7400      26.1        74       117        60
OIR    2025130    131400   -9.3900 -136.7500      26.1        74       116        60
OIR    2025130    131400   -9.3900 -136.7600      26.1        74       112        60
OIR    2025130    131400   -9.3900 -136.7700      26.0        74       110        60
OIR    2025130    131400   -9.3900 -136.7800      26.0        74       109        60
OIR    2025130    131400   -9.3900 -136.7900      25.9        74       109        60
OIR    2025130    131400   -9.3900 -136.8000      25.8        73       109        60
OIR    2025130    131400   -9.3900 -136.8100      25.8        73       111        60
OIR    2025130    131400   -9.3900 -136.8200      25.7        73       114        60
OIR    2025130    131400   -9.3900 -136.8300      25.7        73       116        60
OIR    2025130    131400   -9.3900 -136.8400      25.7        73       116        60
OIR    2025130    131400   -9.3900 -136.8500      25.7        73       116        60
OIR    2025130    131400   -9.3900 -136.8600      25.7        73       116        60
OIR    2025130    131400   -9.3900 -136.8700      25.8        72       116        60
OIR    2025130    131400   -9.3900 -136.8800      26.1        71       115        60
OIR    2025130    131400   -9.3900 -136.8900      26.4        70       113        60
OIR    2025130    131400   -9.3900 -136.9000      26.8        69       112        60
OIR    2025130    131400   -9.3900 -136.9100      27.3        68       112        60
OIR    2025130    131400   -9.3900 -136.9200      27.7        67       115        60
OIR    2025130    131400   -9.3900 -136.9300      28.0        67       116        60
OIR    2025130    131400   -9.3900 -136.9400      28.1        67       116        60
OIR    2025130    131400   -9.3900 -136.9500      28.3        66       116        60
OIR    2025130    131400   -9.3900 -136.9600      28.4        66       115        60
OIR    2025130    131400   -9.3900 -136.9700      28.5        66       114        60
OIR    2025130    131400   -9.3900 -136.9800      28.6        65       113        60
OIR    2025130    131400   -9.3900 -136.9900      28.6        65       113        60
OIR    2025130    131400   -9.3900 -137.0000      28.6        65       113        60
OIR    2025130    131400   -9.3900 -137.0100      28.6        65       113        60
OIR    2025130    131400   -9.3900 -137.0200      28.6        65       113        60
OIR    2025130    131400   -9.3900 -137.0300      28.6        65       111        60
OIR    2025130    131400   -9.3900 -137.0400      28.6        65       110        60
OIR    2025130    131400   -9.3900 -137.0500      28.6        65       111        60
OIR    2025130    131400   -9.3900 -137.0600      28.6        65       112        60
OIR    2025130    131400   -9.3900 -137.0700      28.6        65       111        60
OIR    2025130    131400   -9.3900 -137.0800      28.6        65       111        60
OIR    2025130    131400   -9.3900 -137.0900      28.6        65       111        60
OIR    2025130    131400   -9.3900 -137.1000      28.7        65       109        60
OIR    2025130    131400   -9.3900 -137.1100      28.7        65       107        60
OIR    2025130    131400   -9.3900 -137.1200      28.7        65       109        60
OIR    2025130    131400   -9.3900 -137.1300      28.7        65       110        60
OIR    2025130    131400   -9.3900 -137.1400      28.7        65       113        60
OIR    2025130    131400   -9.3900 -137.1500      28.7        65       115        60
OIR    2025130    131400   -9.3900 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.3900 -137.1700      28.6        65       114        60
OIR    2025130    131400   -9.3900 -137.1800      28.5        65       111        60
OIR    2025130    131400   -9.3900 -137.1900      28.4        64       110        60
OIR    2025130    131400   -9.3900 -137.2000      28.2        64       111        60
OIR    2025130    131400   -9.3900 -137.2100      28.1        64       111        60
OIR    2025130    131400   -9.3900 -137.2200      28.0        64       110        60
OIR    2025130    131400   -9.3900 -137.2300      27.8        64       108        60
OIR    2025130    131400   -9.3900 -137.2400      27.7        63       107        60
OIR    2025130    131400   -9.3900 -137.2500      27.6        63       104        60
OIR    2025130    131400   -9.3900 -137.2600      27.6        63       103        60
OIR    2025130    131400   -9.3900 -137.2700      27.5        63       103        60
OIR    2025130    131400   -9.3900 -137.2800      27.5        63       103        60
OIR    2025130    131400   -9.3900 -137.2900      27.5        63       103        60
OIR    2025130    131400   -9.3900 -137.3000      27.5        63       103        60
OIR    2025130    131400   -9.3900 -137.3100      27.4        63       103        60
OIR    2025130    131400   -9.3900 -137.3200      27.4        63       103        60
OIR    2025130    131400   -9.3900 -137.3300      27.3        63       103        60
OIR    2025130    131400   -9.3900 -137.3400      27.0        63       103        60
OIR    2025130    131400   -9.3900 -137.3500      25.2        61       103        60
OIR    2025130    131400   -9.3900 -137.3600      24.5        61       103        60
OIR    2025130    131400   -9.3900 -137.3700      23.8        61       103        60
OIR    2025130    131400   -9.3900 -137.3800      22.7        61       103        60
OIR    2025130    131400   -9.3900 -137.3900      20.6        61       103        60
OIR    2025130    131400   -9.3900 -137.4000      18.9        61       103        60
OIR    2025130    131400   -9.3900 -137.4100      17.3        63       103        60
OIR    2025130    131400   -9.3900 -137.4200      16.0        64       103        60
OIR    2025130    131400   -9.3900 -137.4300      14.6        65       103        60
OIR    2025130    131400   -9.3900 -137.4400      12.4        65       103        60
OIR    2025130    131400   -9.3900 -137.4500       7.2        60       103        60
OIR    2025130    131400   -9.3900 -137.6600       4.2       296       107        60
OIR    2025130    131400   -9.3900 -137.6700       4.9       289       110        60
OIR    2025130    131400   -9.3900 -137.6800       5.3       287       112        60
OIR    2025130    131400   -9.3900 -137.6900       5.5       287       111        60
OIR    2025130    131400   -9.3900 -137.7000       5.5       286       110        60
OIR    2025130    131400   -9.3900 -137.7100       5.6       286       107        60
OIR    2025130    131400   -9.3900 -137.7200       5.7       286       107        60
OIR    2025130    131400   -9.3900 -137.7300       5.7       286       108        60
OIR    2025130    131400   -9.3900 -137.7400       5.8       285       110        60
OIR    2025130    131400   -9.3900 -137.7500       5.8       285       113        60
OIR    2025130    131400   -9.3900 -137.7600       5.9       285       112        60
OIR    2025130    131400   -9.3900 -137.7700       5.9       285       112        60
OIR    2025130    131400   -9.3900 -137.7800       6.0       285       114        60
OIR    2025130    131400   -9.3900 -137.7900       6.1       285       115        60
OIR    2025130    131400   -9.3900 -137.8000       6.2       285       115        60
OIR    2025130    131400   -9.3900 -137.8100       6.7       284       114        60
OIR    2025130    131400   -9.3900 -137.8200       7.7       282       112        60
OIR    2025130    131400   -9.3900 -137.8300       8.6       280       112        60
OIR    2025130    131400   -9.3900 -137.8400       9.1       280       112        60
OIR    2025130    131400   -9.3900 -137.8500       9.4       279       113        60
OIR    2025130    131400   -9.3900 -137.8600       9.5       279       114        60
OIR    2025130    131400   -9.3900 -137.8700       9.5       279       113        60
OIR    2025130    131400   -9.3900 -137.8800       9.5       279       112        60
OIR    2025130    131400   -9.3900 -137.8900       9.6       279       111        60
OIR    2025130    131400   -9.3900 -137.9000       9.7       279       111        60
OIR    2025130    131400   -9.3900 -137.9100       9.8       279       113        60
OIR    2025130    131400   -9.3900 -137.9200      10.1       279       114        60
OIR    2025130    131400   -9.3900 -137.9300      10.5       279       114        60
OIR    2025130    131400   -9.3900 -137.9400      11.0       280       114        60
OIR    2025130    131400   -9.3900 -137.9500      11.4       280       114        60
OIR    2025130    131400   -9.3900 -137.9600      11.6       281       116        60
OIR    2025130    131400   -9.3900 -137.9700      11.8       283       117        60
OIR    2025130    131400   -9.3900 -137.9800      12.0       285       119        60
OIR    2025130    131400   -9.3900 -137.9900      12.1       288       120        60
OIR    2025130    131400   -9.3900 -138.0000      12.1       292       119        60
OIR    2025130    131400   -9.3900 -138.0100      12.2       298       117        60
OIR    2025130    131400   -9.3900 -138.0200      12.4       302       116        60
OIR    2025130    131400   -9.3900 -138.0300      12.5       307       116        60
OIR    2025130    131400   -9.3900 -138.0400      12.6       311       117        60
OIR    2025130    131400   -9.3900 -138.0500      12.9       314       120        60
OIR    2025130    131400   -9.3900 -138.0600      13.3       315       122        60
OIR    2025130    131400   -9.3900 -138.0700      13.5       317       127        60
OIR    2025130    131400   -9.3900 -138.0800      13.7       319       131        60
OIR    2025130    131400   -9.3900 -138.0900      13.8       324       138        60
OIR    2025130    131400   -9.3900 -138.1000      14.0       327       143        60
OIR    2025130    131400   -9.3900 -138.1100      14.2       329       146        60
OIR    2025130    131400   -9.3900 -138.1200      14.4       330       147        60
OIR    2025130    131400   -9.3900 -138.1300      14.6       331       146        60
OIR    2025130    131400   -9.3900 -138.1400      14.8       331       146        60
OIR    2025130    131400   -9.3900 -138.1500      14.9       331       148        60
OIR    2025130    131400   -9.3900 -138.3200      25.3       353       143        60
OIR    2025130    131400   -9.3900 -138.3300      25.6       351       125        60
OIR    2025130    131400   -9.3900 -138.3400      25.7       351       116        60
OIR    2025130    131400   -9.3900 -138.3500      25.8       351       112        60
OIR    2025130    131400   -9.3900 -138.3600      25.8       351       108        60
OIR    2025130    131400   -9.3900 -138.3700      25.9       351       104        60
OIR    2025130    131400   -9.3900 -138.3800      26.3       351       104        60
OIR    2025130    131400   -9.3900 -138.3900      27.1       352       103        60
OIR    2025130    131400   -9.3900 -138.4000      28.4       354       103        60
OIR    2025130    131400   -9.3900 -138.4100      29.7       355       103        60
OIR    2025130    131400   -9.3900 -138.4200      30.6       356       103        60
OIR    2025130    131400   -9.3900 -138.4300      31.1       356       103        60
OIR    2025130    131400   -9.3900 -138.4400      31.2       356       103        60
OIR    2025130    131400   -9.3900 -138.4500      31.3       356       103        60
OIR    2025130    131400   -9.3900 -138.4600      31.3       356       104        60
OIR    2025130    131400   -9.3900 -138.4700      31.3       356       104        60
OIR    2025130    131400   -9.3900 -138.4800      31.4       355       103        60
OIR    2025130    131400   -9.3900 -138.4900      31.4       355       103        60
OIR    2025130    131400   -9.3900 -138.5000      31.4       355       103        60
OIR    2025130    131400   -9.3900 -138.5100      31.4       355       103        60
OIR    2025130    131400   -9.3900 -138.5200      31.3       355       103        60
OIR    2025130    131400   -9.3900 -138.5300      31.3       355       103        60
OIR    2025130    131400   -9.3900 -138.5400      31.4       355       103        60
OIR    2025130    131400   -9.3900 -138.5500      31.3       355       103        60
OIR    2025130    131400   -9.3900 -138.5600      31.2       354       103        60
OIR    2025130    131400   -9.3900 -138.5700      30.5       353       103        60
OIR    2025130    131400   -9.3900 -138.5800      29.4       350       103        60
OIR    2025130    131400   -9.3900 -138.5900      28.9       347       103        60
OIR    2025130    131400   -9.3900 -138.6000      29.1       343       103        60
OIR    2025130    131400   -9.3900 -138.6100      29.7       340       103        60
OIR    2025130    131400   -9.3900 -138.6200      30.4       339       103        60
OIR    2025130    131400   -9.3900 -138.6300      31.1       338       103        60
OIR    2025130    131400   -9.3900 -138.6400      31.5       338       103        60
OIR    2025130    131400   -9.3900 -138.6500      31.6       338       103        60
OIR    2025130    131400   -9.3900 -138.6600      31.7       337       104        60
OIR    2025130    131400   -9.3900 -138.6700      31.7       337       104        60
OIR    2025130    131400   -9.3900 -138.6800      31.6       337       107        60
OIR    2025130    131400   -9.3900 -138.6900      31.3       337       111        60
OIR    2025130    131400   -9.3900 -138.7000      30.9       336       116        60
OIR    2025130    131400   -9.3900 -138.7100      29.8       336       123        60
OIR    2025130    131400   -9.3900 -138.7200      27.7       334       128        60
OIR    2025130    131400   -9.3900 -138.7300      26.7       332       130        60
OIR    2025130    131400   -9.3900 -138.7400      26.0       331       133        60
OIR    2025130    131400   -9.3900 -138.7500      25.8       331       132        60
OIR    2025130    131400   -9.3900 -138.7600      25.7       330       132        60
OIR    2025130    131400   -9.3900 -138.7700      25.7       330       132        60
OIR    2025130    131400   -9.3900 -138.7800      25.7       330       131        60
OIR    2025130    131400   -9.3900 -138.7900      25.6       330       130        60
OIR    2025130    131400   -9.3900 -138.8000      25.6       329       130        60
OIR    2025130    131400   -9.3900 -138.8100      25.5       328       130        60
OIR    2025130    131400   -9.3900 -138.8200      25.2       326       130        60
OIR    2025130    131400   -9.3900 -138.8300      25.3       326       132        60
OIR    2025130    131400   -9.3900 -138.8400      25.2       326       141        60
OIR    2025130    131400   -9.3900 -138.9700      16.8       314       141        60
OIR    2025130    131400   -9.3900 -138.9800      15.7       314       140        60
OIR    2025130    131400   -9.4000 -136.2600      39.5        76       146        60
OIR    2025130    131400   -9.4000 -136.2700      39.5        76       144        60
OIR    2025130    131400   -9.4000 -136.2800      39.5        76       143        60
OIR    2025130    131400   -9.4000 -136.2900      39.5        76       142        60
OIR    2025130    131400   -9.4000 -136.3000      39.5        76       141        60
OIR    2025130    131400   -9.4000 -136.3100      39.6        76       140        60
OIR    2025130    131400   -9.4000 -136.3200      39.6        76       140        60
OIR    2025130    131400   -9.4000 -136.3300      39.7        76       140        60
OIR    2025130    131400   -9.4000 -136.3400      39.7        76       141        60
OIR    2025130    131400   -9.4000 -136.3500      39.8        76       144        60
OIR    2025130    131400   -9.4000 -136.4100      39.8        79       146        60
OIR    2025130    131400   -9.4000 -136.4200      39.9        79       144        60
OIR    2025130    131400   -9.4000 -136.4300      40.0        79       141        60
OIR    2025130    131400   -9.4000 -136.4400      40.0        79       137        60
OIR    2025130    131400   -9.4000 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4000 -136.4600      40.0        79       134        60
OIR    2025130    131400   -9.4000 -136.4700      40.0        79       134        60
OIR    2025130    131400   -9.4000 -136.4800      40.0        79       135        60
OIR    2025130    131400   -9.4000 -136.4900      40.0        79       136        60
OIR    2025130    131400   -9.4000 -136.5000      40.0        79       138        60
OIR    2025130    131400   -9.4000 -136.5100      39.9        79       139        60
OIR    2025130    131400   -9.4000 -136.5200      39.6        79       140        60
OIR    2025130    131400   -9.4000 -136.5300      38.8        79       139        60
OIR    2025130    131400   -9.4000 -136.5400      37.1        79       133        60
OIR    2025130    131400   -9.4000 -136.5500      34.4        79       131        60
OIR    2025130    131400   -9.4000 -136.5600      31.0        78       130        60
OIR    2025130    131400   -9.4000 -136.5700      27.5        76       129        60
OIR    2025130    131400   -9.4000 -136.5800      26.7        75       128        60
OIR    2025130    131400   -9.4000 -136.5900      26.6        75       127        60
OIR    2025130    131400   -9.4000 -136.6000      26.6        75       125        60
OIR    2025130    131400   -9.4000 -136.6100      26.6        75       125        60
OIR    2025130    131400   -9.4000 -136.6200      26.5        75       125        60
OIR    2025130    131400   -9.4000 -136.6300      26.5        75       124        60
OIR    2025130    131400   -9.4000 -136.6400      26.5        75       123        60
OIR    2025130    131400   -9.4000 -136.6500      26.5        75       122        60
OIR    2025130    131400   -9.4000 -136.6600      26.4        75       121        60
OIR    2025130    131400   -9.4000 -136.6700      26.4        75       120        60
OIR    2025130    131400   -9.4000 -136.6800      26.4        75       120        60
OIR    2025130    131400   -9.4000 -136.6900      26.3        75       120        60
OIR    2025130    131400   -9.4000 -136.7000      26.3        75       119        60
OIR    2025130    131400   -9.4000 -136.7100      26.2        74       117        60
OIR    2025130    131400   -9.4000 -136.7200      26.2        74       117        60
OIR    2025130    131400   -9.4000 -136.7300      26.2        74       117        60
OIR    2025130    131400   -9.4000 -136.7400      26.2        74       117        60
OIR    2025130    131400   -9.4000 -136.7500      26.1        74       116        60
OIR    2025130    131400   -9.4000 -136.7600      26.1        74       111        60
OIR    2025130    131400   -9.4000 -136.7700      26.1        74       109        60
OIR    2025130    131400   -9.4000 -136.7800      26.0        74       108        60
OIR    2025130    131400   -9.4000 -136.7900      26.0        74       109        60
OIR    2025130    131400   -9.4000 -136.8000      25.8        73       109        60
OIR    2025130    131400   -9.4000 -136.8100      25.8        73       111        60
OIR    2025130    131400   -9.4000 -136.8200      25.8        73       113        60
OIR    2025130    131400   -9.4000 -136.8300      25.7        73       116        60
OIR    2025130    131400   -9.4000 -136.8400      25.7        73       117        60
OIR    2025130    131400   -9.4000 -136.8500      25.7        73       117        60
OIR    2025130    131400   -9.4000 -136.8600      25.8        73       116        60
OIR    2025130    131400   -9.4000 -136.8700      25.9        72       117        60
OIR    2025130    131400   -9.4000 -136.8800      26.2        71       116        60
OIR    2025130    131400   -9.4000 -136.8900      26.6        69       115        60
OIR    2025130    131400   -9.4000 -136.9000      27.0        68       114        60
OIR    2025130    131400   -9.4000 -136.9100      27.4        67       114        60
OIR    2025130    131400   -9.4000 -136.9200      27.7        67       116        60
OIR    2025130    131400   -9.4000 -136.9300      28.0        66       116        60
OIR    2025130    131400   -9.4000 -136.9400      28.2        66       116        60
OIR    2025130    131400   -9.4000 -136.9500      28.4        66       116        60
OIR    2025130    131400   -9.4000 -136.9600      28.5        65       115        60
OIR    2025130    131400   -9.4000 -136.9700      28.5        65       114        60
OIR    2025130    131400   -9.4000 -136.9800      28.6        65       113        60
OIR    2025130    131400   -9.4000 -136.9900      28.6        65       112        60
OIR    2025130    131400   -9.4000 -137.0000      28.6        65       112        60
OIR    2025130    131400   -9.4000 -137.0100      28.6        65       112        60
OIR    2025130    131400   -9.4000 -137.0200      28.6        65       113        60
OIR    2025130    131400   -9.4000 -137.0300      28.6        65       110        60
OIR    2025130    131400   -9.4000 -137.0400      28.6        65       109        60
OIR    2025130    131400   -9.4000 -137.0500      28.6        65       111        60
OIR    2025130    131400   -9.4000 -137.0600      28.6        65       112        60
OIR    2025130    131400   -9.4000 -137.0700      28.6        65       112        60
OIR    2025130    131400   -9.4000 -137.0800      28.7        65       111        60
OIR    2025130    131400   -9.4000 -137.0900      28.7        65       111        60
OIR    2025130    131400   -9.4000 -137.1000      28.7        65       109        60
OIR    2025130    131400   -9.4000 -137.1100      28.7        65       108        60
OIR    2025130    131400   -9.4000 -137.1200      28.7        65       109        60
OIR    2025130    131400   -9.4000 -137.1300      28.7        65       111        60
OIR    2025130    131400   -9.4000 -137.1400      28.7        65       113        60
OIR    2025130    131400   -9.4000 -137.1500      28.7        65       115        60
OIR    2025130    131400   -9.4000 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.4000 -137.1700      28.6        65       115        60
OIR    2025130    131400   -9.4000 -137.1800      28.5        64       112        60
OIR    2025130    131400   -9.4000 -137.1900      28.4        64       111        60
OIR    2025130    131400   -9.4000 -137.2000      28.3        64       111        60
OIR    2025130    131400   -9.4000 -137.2100      28.2        64       111        60
OIR    2025130    131400   -9.4000 -137.2200      28.0        64       110        60
OIR    2025130    131400   -9.4000 -137.2300      27.9        63       108        60
OIR    2025130    131400   -9.4000 -137.2400      27.8        63       107        60
OIR    2025130    131400   -9.4000 -137.2500      27.7        63       104        60
OIR    2025130    131400   -9.4000 -137.2600      27.6        63       103        60
OIR    2025130    131400   -9.4000 -137.2700      27.6        63       103        60
OIR    2025130    131400   -9.4000 -137.2800      27.5        63       103        60
OIR    2025130    131400   -9.4000 -137.2900      27.5        63       103        60
OIR    2025130    131400   -9.4000 -137.3000      27.5        63       103        60
OIR    2025130    131400   -9.4000 -137.3100      27.5        63       103        60
OIR    2025130    131400   -9.4000 -137.3200      27.4        63       103        60
OIR    2025130    131400   -9.4000 -137.3300      27.3        63       103        60
OIR    2025130    131400   -9.4000 -137.3400      27.2        63       103        60
OIR    2025130    131400   -9.4000 -137.3500      25.8        62       103        60
OIR    2025130    131400   -9.4000 -137.3600      24.8        62       103        60
OIR    2025130    131400   -9.4000 -137.3700      24.0        61       103        60
OIR    2025130    131400   -9.4000 -137.3800      22.8        61       103        60
OIR    2025130    131400   -9.4000 -137.3900      21.1        62       103        60
OIR    2025130    131400   -9.4000 -137.4000      19.6        62       103        60
OIR    2025130    131400   -9.4000 -137.4100      17.9        64       103        60
OIR    2025130    131400   -9.4000 -137.4200      16.6        65       103        60
OIR    2025130    131400   -9.4000 -137.4300      15.2        67       103        60
OIR    2025130    131400   -9.4000 -137.4400      13.5        68       103        60
OIR    2025130    131400   -9.4000 -137.4500       9.6        67       103        60
OIR    2025130    131400   -9.4000 -137.4600       5.4        61       103        60
OIR    2025130    131400   -9.4000 -137.6700       4.4       295       107        60
OIR    2025130    131400   -9.4000 -137.6800       5.1       289       110        60
OIR    2025130    131400   -9.4000 -137.6900       5.4       287       110        60
OIR    2025130    131400   -9.4000 -137.7000       5.5       287       109        60
OIR    2025130    131400   -9.4000 -137.7100       5.6       287       107        60
OIR    2025130    131400   -9.4000 -137.7200       5.6       287       107        60
OIR    2025130    131400   -9.4000 -137.7300       5.7       286       108        60
OIR    2025130    131400   -9.4000 -137.7400       5.7       286       109        60
OIR    2025130    131400   -9.4000 -137.7500       5.8       286       112        60
OIR    2025130    131400   -9.4000 -137.7600       5.8       286       110        60
OIR    2025130    131400   -9.4000 -137.7700       5.9       286       110        60
OIR    2025130    131400   -9.4000 -137.7800       6.0       286       111        60
OIR    2025130    131400   -9.4000 -137.7900       6.1       286       112        60
OIR    2025130    131400   -9.4000 -137.8000       6.3       285       112        60
OIR    2025130    131400   -9.4000 -137.8100       7.0       283       112        60
OIR    2025130    131400   -9.4000 -137.8200       8.5       281       110        60
OIR    2025130    131400   -9.4000 -137.8300       9.2       279       111        60
OIR    2025130    131400   -9.4000 -137.8400       9.5       279       112        60
OIR    2025130    131400   -9.4000 -137.8500       9.5       279       114        60
OIR    2025130    131400   -9.4000 -137.8600       9.6       279       115        60
OIR    2025130    131400   -9.4000 -137.8700       9.6       279       113        60
OIR    2025130    131400   -9.4000 -137.8800       9.6       279       112        60
OIR    2025130    131400   -9.4000 -137.8900       9.6       279       112        60
OIR    2025130    131400   -9.4000 -137.9000       9.7       280       112        60
OIR    2025130    131400   -9.4000 -137.9100       9.9       280       113        60
OIR    2025130    131400   -9.4000 -137.9200      10.3       281       114        60
OIR    2025130    131400   -9.4000 -137.9300      10.8       281       115        60
OIR    2025130    131400   -9.4000 -137.9400      11.3       282       115        60
OIR    2025130    131400   -9.4000 -137.9500      11.7       282       115        60
OIR    2025130    131400   -9.4000 -137.9600      12.0       283       116        60
OIR    2025130    131400   -9.4000 -137.9700      12.2       285       116        60
OIR    2025130    131400   -9.4000 -137.9800      12.5       287       117        60
OIR    2025130    131400   -9.4000 -137.9900      12.7       291       119        60
OIR    2025130    131400   -9.4000 -138.0000      12.8       296       117        60
OIR    2025130    131400   -9.4000 -138.0100      12.9       301       116        60
OIR    2025130    131400   -9.4000 -138.0200      13.1       306       116        60
OIR    2025130    131400   -9.4000 -138.0300      13.2       310       116        60
OIR    2025130    131400   -9.4000 -138.0400      13.4       314       116        60
OIR    2025130    131400   -9.4000 -138.0500      13.7       316       119        60
OIR    2025130    131400   -9.4000 -138.0600      14.1       317       123        60
OIR    2025130    131400   -9.4000 -138.0700      14.4       318       126        60
OIR    2025130    131400   -9.4000 -138.0800      14.7       320       130        60
OIR    2025130    131400   -9.4000 -138.0900      14.8       324       134        60
OIR    2025130    131400   -9.4000 -138.1000      14.8       326       139        60
OIR    2025130    131400   -9.4000 -138.1100      15.0       327       141        60
OIR    2025130    131400   -9.4000 -138.1200      15.3       328       142        60
OIR    2025130    131400   -9.4000 -138.1300      15.4       329       142        60
OIR    2025130    131400   -9.4000 -138.1400      15.6       330       143        60
OIR    2025130    131400   -9.4000 -138.1500      15.6       329       147        60
OIR    2025130    131400   -9.4000 -138.3200      24.0       351       146        60
OIR    2025130    131400   -9.4000 -138.3300      25.2       350       136        60
OIR    2025130    131400   -9.4000 -138.3400      25.7       351       127        60
OIR    2025130    131400   -9.4000 -138.3500      25.7       351       119        60
OIR    2025130    131400   -9.4000 -138.3600      25.7       351       113        60
OIR    2025130    131400   -9.4000 -138.3700      25.8       350       111        60
OIR    2025130    131400   -9.4000 -138.3800      26.1       350       109        60
OIR    2025130    131400   -9.4000 -138.3900      26.7       351       107        60
OIR    2025130    131400   -9.4000 -138.4000      27.6       352       105        60
OIR    2025130    131400   -9.4000 -138.4100      28.8       353       104        60
OIR    2025130    131400   -9.4000 -138.4200      30.0       354       105        60
OIR    2025130    131400   -9.4000 -138.4300      30.9       355       105        60
OIR    2025130    131400   -9.4000 -138.4400      31.2       356       105        60
OIR    2025130    131400   -9.4000 -138.4500      31.3       356       105        60
OIR    2025130    131400   -9.4000 -138.4600      31.3       356       104        60
OIR    2025130    131400   -9.4000 -138.4700      31.3       355       104        60
OIR    2025130    131400   -9.4000 -138.4800      31.4       355       105        60
OIR    2025130    131400   -9.4000 -138.4900      31.4       355       105        60
OIR    2025130    131400   -9.4000 -138.5000      31.4       355       107        60
OIR    2025130    131400   -9.4000 -138.5100      31.4       355       105        60
OIR    2025130    131400   -9.4000 -138.5200      31.4       355       105        60
OIR    2025130    131400   -9.4000 -138.5300      31.3       355       104        60
OIR    2025130    131400   -9.4000 -138.5400      31.4       355       104        60
OIR    2025130    131400   -9.4000 -138.5500      31.3       355       104        60
OIR    2025130    131400   -9.4000 -138.5600      31.2       355       104        60
OIR    2025130    131400   -9.4000 -138.5700      30.2       353       104        60
OIR    2025130    131400   -9.4000 -138.5800      28.6       350       103        60
OIR    2025130    131400   -9.4000 -138.5900      27.7       346       103        60
OIR    2025130    131400   -9.4000 -138.6000      28.0       342       103        60
OIR    2025130    131400   -9.4000 -138.6100      29.2       339       103        60
OIR    2025130    131400   -9.4000 -138.6200      30.4       338       103        60
OIR    2025130    131400   -9.4000 -138.6300      31.3       337       103        60
OIR    2025130    131400   -9.4000 -138.6400      31.6       337       105        60
OIR    2025130    131400   -9.4000 -138.6500      31.7       337       109        60
OIR    2025130    131400   -9.4000 -138.6600      31.7       337       112        60
OIR    2025130    131400   -9.4000 -138.6700      31.7       337       116        60
OIR    2025130    131400   -9.4000 -138.6800      31.6       338       120        60
OIR    2025130    131400   -9.4000 -138.6900      31.5       337       122        60
OIR    2025130    131400   -9.4000 -138.7000      30.7       337       121        60
OIR    2025130    131400   -9.4000 -138.7100      29.5       337       126        60
OIR    2025130    131400   -9.4000 -138.7200      27.6       335       132        60
OIR    2025130    131400   -9.4000 -138.7300      26.2       333       138        60
OIR    2025130    131400   -9.4000 -138.7400      25.7       332       143        60
OIR    2025130    131400   -9.4000 -138.7500      25.6       331       140        60
OIR    2025130    131400   -9.4000 -138.7600      25.6       331       138        60
OIR    2025130    131400   -9.4000 -138.7700      25.6       330       136        60
OIR    2025130    131400   -9.4000 -138.7800      25.6       330       135        60
OIR    2025130    131400   -9.4000 -138.7900      25.6       330       134        60
OIR    2025130    131400   -9.4000 -138.8000      25.7       329       137        60
OIR    2025130    131400   -9.4000 -138.8100      25.6       329       142        60
OIR    2025130    131400   -9.4000 -138.8200      25.2       327       139        60
OIR    2025130    131400   -9.4000 -138.8300      25.2       326       140        60
OIR    2025130    131400   -9.4000 -138.9700      16.1       312       147        60
OIR    2025130    131400   -9.4100 -136.2500      39.4        76       147        60
OIR    2025130    131400   -9.4100 -136.2600      39.4        76       145        60
OIR    2025130    131400   -9.4100 -136.2700      39.5        76       144        60
OIR    2025130    131400   -9.4100 -136.2800      39.5        76       144        60
OIR    2025130    131400   -9.4100 -136.2900      39.5        76       143        60
OIR    2025130    131400   -9.4100 -136.3000      39.5        76       140        60
OIR    2025130    131400   -9.4100 -136.3100      39.6        76       140        60
OIR    2025130    131400   -9.4100 -136.3200      39.7        76       140        60
OIR    2025130    131400   -9.4100 -136.3300      39.8        77       141        60
OIR    2025130    131400   -9.4100 -136.3400      39.9        77       142        60
OIR    2025130    131400   -9.4100 -136.3500      39.9        77       144        60
OIR    2025130    131400   -9.4100 -136.4200      40.0        79       144        60
OIR    2025130    131400   -9.4100 -136.4300      40.0        79       139        60
OIR    2025130    131400   -9.4100 -136.4400      40.0        79       136        60
OIR    2025130    131400   -9.4100 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4100 -136.4600      40.0        79       133        60
OIR    2025130    131400   -9.4100 -136.4700      40.0        79       132        60
OIR    2025130    131400   -9.4100 -136.4800      40.0        79       134        60
OIR    2025130    131400   -9.4100 -136.4900      40.0        79       135        60
OIR    2025130    131400   -9.4100 -136.5000      40.0        79       137        60
OIR    2025130    131400   -9.4100 -136.5100      39.9        79       138        60
OIR    2025130    131400   -9.4100 -136.5200      39.7        79       139        60
OIR    2025130    131400   -9.4100 -136.5300      39.1        79       137        60
OIR    2025130    131400   -9.4100 -136.5400      37.4        79       134        60
OIR    2025130    131400   -9.4100 -136.5500      34.5        79       132        60
OIR    2025130    131400   -9.4100 -136.5600      30.5        77       131        60
OIR    2025130    131400   -9.4100 -136.5700      27.5        76       129        60
OIR    2025130    131400   -9.4100 -136.5800      26.7        75       128        60
OIR    2025130    131400   -9.4100 -136.5900      26.6        75       127        60
OIR    2025130    131400   -9.4100 -136.6000      26.6        75       126        60
OIR    2025130    131400   -9.4100 -136.6100      26.6        75       125        60
OIR    2025130    131400   -9.4100 -136.6200      26.5        75       125        60
OIR    2025130    131400   -9.4100 -136.6300      26.5        75       125        60
OIR    2025130    131400   -9.4100 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.4100 -136.6500      26.5        75       123        60
OIR    2025130    131400   -9.4100 -136.6600      26.4        75       121        60
OIR    2025130    131400   -9.4100 -136.6700      26.4        75       120        60
OIR    2025130    131400   -9.4100 -136.6800      26.4        75       120        60
OIR    2025130    131400   -9.4100 -136.6900      26.3        75       120        60
OIR    2025130    131400   -9.4100 -136.7000      26.3        75       119        60
OIR    2025130    131400   -9.4100 -136.7100      26.3        74       117        60
OIR    2025130    131400   -9.4100 -136.7200      26.2        74       117        60
OIR    2025130    131400   -9.4100 -136.7300      26.2        74       117        60
OIR    2025130    131400   -9.4100 -136.7400      26.2        74       117        60
OIR    2025130    131400   -9.4100 -136.7500      26.1        74       116        60
OIR    2025130    131400   -9.4100 -136.7600      26.1        74       110        60
OIR    2025130    131400   -9.4100 -136.7700      26.1        74       109        60
OIR    2025130    131400   -9.4100 -136.7800      26.0        74       109        60
OIR    2025130    131400   -9.4100 -136.7900      26.0        74       110        60
OIR    2025130    131400   -9.4100 -136.8000      25.8        73       111        60
OIR    2025130    131400   -9.4100 -136.8100      25.8        73       111        60
OIR    2025130    131400   -9.4100 -136.8200      25.8        73       112        60
OIR    2025130    131400   -9.4100 -136.8300      25.7        73       116        60
OIR    2025130    131400   -9.4100 -136.8400      25.7        73       119        60
OIR    2025130    131400   -9.4100 -136.8500      25.8        73       119        60
OIR    2025130    131400   -9.4100 -136.8600      25.9        72       119        60
OIR    2025130    131400   -9.4100 -136.8700      26.2        71       117        60
OIR    2025130    131400   -9.4100 -136.8800      26.4        70       116        60
OIR    2025130    131400   -9.4100 -136.8900      26.9        68       116        60
OIR    2025130    131400   -9.4100 -136.9000      27.3        67       116        60
OIR    2025130    131400   -9.4100 -136.9100      27.6        66       116        60
OIR    2025130    131400   -9.4100 -136.9200      27.8        66       116        60
OIR    2025130    131400   -9.4100 -136.9300      28.0        66       116        60
OIR    2025130    131400   -9.4100 -136.9400      28.2        66       116        60
OIR    2025130    131400   -9.4100 -136.9500      28.4        65       115        60
OIR    2025130    131400   -9.4100 -136.9600      28.5        65       115        60
OIR    2025130    131400   -9.4100 -136.9700      28.5        65       114        60
OIR    2025130    131400   -9.4100 -136.9800      28.6        65       112        60
OIR    2025130    131400   -9.4100 -136.9900      28.6        65       112        60
OIR    2025130    131400   -9.4100 -137.0000      28.6        65       112        60
OIR    2025130    131400   -9.4100 -137.0100      28.6        65       112        60
OIR    2025130    131400   -9.4100 -137.0200      28.6        65       113        60
OIR    2025130    131400   -9.4100 -137.0300      28.6        65       110        60
OIR    2025130    131400   -9.4100 -137.0400      28.6        65       110        60
OIR    2025130    131400   -9.4100 -137.0500      28.6        65       111        60
OIR    2025130    131400   -9.4100 -137.0600      28.7        65       112        60
OIR    2025130    131400   -9.4100 -137.0700      28.7        65       112        60
OIR    2025130    131400   -9.4100 -137.0800      28.7        65       111        60
OIR    2025130    131400   -9.4100 -137.0900      28.7        65       111        60
OIR    2025130    131400   -9.4100 -137.1000      28.7        65       110        60
OIR    2025130    131400   -9.4100 -137.1100      28.7        65       109        60
OIR    2025130    131400   -9.4100 -137.1200      28.7        65       110        60
OIR    2025130    131400   -9.4100 -137.1300      28.7        65       110        60
OIR    2025130    131400   -9.4100 -137.1400      28.7        65       114        60
OIR    2025130    131400   -9.4100 -137.1500      28.7        65       116        60
OIR    2025130    131400   -9.4100 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.4100 -137.1700      28.6        65       115        60
OIR    2025130    131400   -9.4100 -137.1800      28.5        64       114        60
OIR    2025130    131400   -9.4100 -137.1900      28.4        64       113        60
OIR    2025130    131400   -9.4100 -137.2000      28.3        64       112        60
OIR    2025130    131400   -9.4100 -137.2100      28.2        64       111        60
OIR    2025130    131400   -9.4100 -137.2200      28.0        64       110        60
OIR    2025130    131400   -9.4100 -137.2300      27.9        63       109        60
OIR    2025130    131400   -9.4100 -137.2400      27.8        63       107        60
OIR    2025130    131400   -9.4100 -137.2500      27.7        63       104        60
OIR    2025130    131400   -9.4100 -137.2600      27.7        63       103        60
OIR    2025130    131400   -9.4100 -137.2700      27.6        63       103        60
OIR    2025130    131400   -9.4100 -137.2800      27.6        63       103        60
OIR    2025130    131400   -9.4100 -137.2900      27.6        63       103        60
OIR    2025130    131400   -9.4100 -137.3000      27.5        63       103        60
OIR    2025130    131400   -9.4100 -137.3100      27.5        63       103        60
OIR    2025130    131400   -9.4100 -137.3200      27.4        63       103        60
OIR    2025130    131400   -9.4100 -137.3300      27.4        63       103        60
OIR    2025130    131400   -9.4100 -137.3400      27.3        63       103        60
OIR    2025130    131400   -9.4100 -137.3500      26.4        63       103        60
OIR    2025130    131400   -9.4100 -137.3600      25.3        63       103        60
OIR    2025130    131400   -9.4100 -137.3700      24.3        62       103        60
OIR    2025130    131400   -9.4100 -137.3800      23.1        62       103        60
OIR    2025130    131400   -9.4100 -137.3900      21.4        63       103        60
OIR    2025130    131400   -9.4100 -137.4000      20.2        64       103        60
OIR    2025130    131400   -9.4100 -137.4100      18.5        65       103        60
OIR    2025130    131400   -9.4100 -137.4200      17.2        67       103        60
OIR    2025130    131400   -9.4100 -137.4300      15.9        69       103        60
OIR    2025130    131400   -9.4100 -137.4400      14.4        70       103        60
OIR    2025130    131400   -9.4100 -137.4500      11.4        70       103        60
OIR    2025130    131400   -9.4100 -137.4600       8.2        71       103        60
OIR    2025130    131400   -9.4100 -137.4700       5.6        71       103        60
OIR    2025130    131400   -9.4100 -137.6700       4.1       301       104        60
OIR    2025130    131400   -9.4100 -137.6800       4.7       296       105        60
OIR    2025130    131400   -9.4100 -137.6900       5.3       290       107        60
OIR    2025130    131400   -9.4100 -137.7000       5.4       288       108        60
OIR    2025130    131400   -9.4100 -137.7100       5.5       288       109        60
OIR    2025130    131400   -9.4100 -137.7200       5.6       287       109        60
OIR    2025130    131400   -9.4100 -137.7300       5.7       287       108        60
OIR    2025130    131400   -9.4100 -137.7400       5.7       287       108        60
OIR    2025130    131400   -9.4100 -137.7500       5.8       287       110        60
OIR    2025130    131400   -9.4100 -137.7600       5.8       286       109        60
OIR    2025130    131400   -9.4100 -137.7700       5.9       286       108        60
OIR    2025130    131400   -9.4100 -137.7800       6.0       286       108        60
OIR    2025130    131400   -9.4100 -137.7900       6.1       286       108        60
OIR    2025130    131400   -9.4100 -137.8000       6.3       286       108        60
OIR    2025130    131400   -9.4100 -137.8100       7.3       283       108        60
OIR    2025130    131400   -9.4100 -137.8200       9.0       279       108        60
OIR    2025130    131400   -9.4100 -137.8300       9.5       279       110        60
OIR    2025130    131400   -9.4100 -137.8400       9.5       279       113        60
OIR    2025130    131400   -9.4100 -137.8500       9.6       279       114        60
OIR    2025130    131400   -9.4100 -137.8600       9.6       279       115        60
OIR    2025130    131400   -9.4100 -137.8700       9.6       279       114        60
OIR    2025130    131400   -9.4100 -137.8800       9.6       279       113        60
OIR    2025130    131400   -9.4100 -137.8900       9.7       280       114        60
OIR    2025130    131400   -9.4100 -137.9000       9.9       280       115        60
OIR    2025130    131400   -9.4100 -137.9100      10.1       281       115        60
OIR    2025130    131400   -9.4100 -137.9200      10.5       282       115        60
OIR    2025130    131400   -9.4100 -137.9300      11.1       283       116        60
OIR    2025130    131400   -9.4100 -137.9400      11.7       284       115        60
OIR    2025130    131400   -9.4100 -137.9500      12.1       284       115        60
OIR    2025130    131400   -9.4100 -137.9600      12.5       286       116        60
OIR    2025130    131400   -9.4100 -137.9700      12.8       288       116        60
OIR    2025130    131400   -9.4100 -137.9800      13.2       291       116        60
OIR    2025130    131400   -9.4100 -137.9900      13.6       295       117        60
OIR    2025130    131400   -9.4100 -138.0000      13.8       301       116        60
OIR    2025130    131400   -9.4100 -138.0100      14.1       306       116        60
OIR    2025130    131400   -9.4100 -138.0200      14.1       310       115        60
OIR    2025130    131400   -9.4100 -138.0300      14.2       312       115        60
OIR    2025130    131400   -9.4100 -138.0400      14.4       315       116        60
OIR    2025130    131400   -9.4100 -138.0500      14.8       318       119        60
OIR    2025130    131400   -9.4100 -138.0600      15.2       319       123        60
OIR    2025130    131400   -9.4100 -138.0700      15.4       320       125        60
OIR    2025130    131400   -9.4100 -138.0800      15.6       322       128        60
OIR    2025130    131400   -9.4100 -138.0900      15.8       324       131        60
OIR    2025130    131400   -9.4100 -138.1000      15.8       326       134        60
OIR    2025130    131400   -9.4100 -138.1100      15.9       327       135        60
OIR    2025130    131400   -9.4100 -138.1200      16.2       327       136        60
OIR    2025130    131400   -9.4100 -138.1300      16.4       328       137        60
OIR    2025130    131400   -9.4100 -138.1400      16.5       328       141        60
OIR    2025130    131400   -9.4100 -138.1500      16.6       328       146        60
OIR    2025130    131400   -9.4100 -138.1600      16.7       327       147        60
OIR    2025130    131400   -9.4100 -138.1700      17.0       327       147        60
OIR    2025130    131400   -9.4100 -138.3200      22.2       345       149        60
OIR    2025130    131400   -9.4100 -138.3300      23.8       345       147        60
OIR    2025130    131400   -9.4100 -138.3400      24.8       347       138        60
OIR    2025130    131400   -9.4100 -138.3500      25.3       349       125        60
OIR    2025130    131400   -9.4100 -138.3600      25.2       349       117        60
OIR    2025130    131400   -9.4100 -138.3700      25.2       348       116        60
OIR    2025130    131400   -9.4100 -138.3800      25.5       348       114        60
OIR    2025130    131400   -9.4100 -138.3900      26.1       348       111        60
OIR    2025130    131400   -9.4100 -138.4000      26.9       349       109        60
OIR    2025130    131400   -9.4100 -138.4100      28.0       350       105        60
OIR    2025130    131400   -9.4100 -138.4200      29.3       352       108        60
OIR    2025130    131400   -9.4100 -138.4300      30.3       354       109        60
OIR    2025130    131400   -9.4100 -138.4400      31.0       355       109        60
OIR    2025130    131400   -9.4100 -138.4500      31.2       355       108        60
OIR    2025130    131400   -9.4100 -138.4600      31.3       355       107        60
OIR    2025130    131400   -9.4100 -138.4700      31.3       355       107        60
OIR    2025130    131400   -9.4100 -138.4800      31.3       355       109        60
OIR    2025130    131400   -9.4100 -138.4900      31.4       355       110        60
OIR    2025130    131400   -9.4100 -138.5000      31.4       355       111        60
OIR    2025130    131400   -9.4100 -138.5100      31.4       355       110        60
OIR    2025130    131400   -9.4100 -138.5200      31.3       355       109        60
OIR    2025130    131400   -9.4100 -138.5300      31.3       355       105        60
OIR    2025130    131400   -9.4100 -138.5400      31.3       355       104        60
OIR    2025130    131400   -9.4100 -138.5500      31.3       355       108        60
OIR    2025130    131400   -9.4100 -138.5600      30.9       354       107        60
OIR    2025130    131400   -9.4100 -138.5700      29.4       352       104        60
OIR    2025130    131400   -9.4100 -138.5800      26.5       347       103        60
OIR    2025130    131400   -9.4100 -138.5900      25.2       342       103        60
OIR    2025130    131400   -9.4100 -138.6000      25.6       340       103        60
OIR    2025130    131400   -9.4100 -138.6100      28.0       336       103        60
OIR    2025130    131400   -9.4100 -138.6200      29.5       336       103        60
OIR    2025130    131400   -9.4100 -138.6300      30.8       336       103        60
OIR    2025130    131400   -9.4100 -138.6400      31.5       337       109        60
OIR    2025130    131400   -9.4100 -138.6500      31.6       337       114        60
OIR    2025130    131400   -9.4100 -138.6600      31.7       338       120        60
OIR    2025130    131400   -9.4100 -138.6700      31.7       338       127        60
OIR    2025130    131400   -9.4100 -138.6800      31.6       338       134        60
OIR    2025130    131400   -9.4100 -138.6900      31.2       338       133        60
OIR    2025130    131400   -9.4100 -138.7000      30.4       338       124        60
OIR    2025130    131400   -9.4100 -138.7100      29.1       337       130        60
OIR    2025130    131400   -9.4100 -138.7200      26.9       336       137        60
OIR    2025130    131400   -9.4100 -138.7300      25.5       334       145        60
OIR    2025130    131400   -9.4100 -138.7600      24.0       330       144        60
OIR    2025130    131400   -9.4100 -138.7700      24.2       330       141        60
OIR    2025130    131400   -9.4100 -138.7800      25.4       330       139        60
OIR    2025130    131400   -9.4100 -138.7900      25.7       330       138        60
OIR    2025130    131400   -9.4100 -138.8000      25.8       329       143        60
OIR    2025130    131400   -9.4200 -136.1200      43.8        83       146        60
OIR    2025130    131400   -9.4200 -136.2000      39.3        76       147        60
OIR    2025130    131400   -9.4200 -136.2100      39.4        76       146        60
OIR    2025130    131400   -9.4200 -136.2200      39.4        76       146        60
OIR    2025130    131400   -9.4200 -136.2300      39.4        76       146        60
OIR    2025130    131400   -9.4200 -136.2400      39.4        76       146        60
OIR    2025130    131400   -9.4200 -136.2500      39.4        76       146        60
OIR    2025130    131400   -9.4200 -136.2600      39.4        76       144        60
OIR    2025130    131400   -9.4200 -136.2700      39.4        76       143        60
OIR    2025130    131400   -9.4200 -136.2800      39.5        76       143        60
OIR    2025130    131400   -9.4200 -136.2900      39.5        76       142        60
OIR    2025130    131400   -9.4200 -136.3000      39.6        76       140        60
OIR    2025130    131400   -9.4200 -136.3100      39.6        76       140        60
OIR    2025130    131400   -9.4200 -136.3200      39.7        77       140        60
OIR    2025130    131400   -9.4200 -136.3300      39.9        77       141        60
OIR    2025130    131400   -9.4200 -136.3400      39.9        77       143        60
OIR    2025130    131400   -9.4200 -136.3500      40.0        78       145        60
OIR    2025130    131400   -9.4200 -136.4200      40.0        79       145        60
OIR    2025130    131400   -9.4200 -136.4300      40.0        79       140        60
OIR    2025130    131400   -9.4200 -136.4400      40.0        79       136        60
OIR    2025130    131400   -9.4200 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4200 -136.4600      40.0        79       132        60
OIR    2025130    131400   -9.4200 -136.4700      40.0        79       132        60
OIR    2025130    131400   -9.4200 -136.4800      40.0        79       133        60
OIR    2025130    131400   -9.4200 -136.4900      40.0        79       135        60
OIR    2025130    131400   -9.4200 -136.5000      39.9        79       137        60
OIR    2025130    131400   -9.4200 -136.5100      39.9        79       138        60
OIR    2025130    131400   -9.4200 -136.5200      39.7        79       139        60
OIR    2025130    131400   -9.4200 -136.5300      39.2        79       137        60
OIR    2025130    131400   -9.4200 -136.5400      37.9        79       134        60
OIR    2025130    131400   -9.4200 -136.5500      34.8        79       133        60
OIR    2025130    131400   -9.4200 -136.5600      30.0        77       132        60
OIR    2025130    131400   -9.4200 -136.5700      27.3        76       130        60
OIR    2025130    131400   -9.4200 -136.5800      26.8        75       129        60
OIR    2025130    131400   -9.4200 -136.5900      26.7        75       128        60
OIR    2025130    131400   -9.4200 -136.6000      26.6        75       128        60
OIR    2025130    131400   -9.4200 -136.6100      26.6        75       127        60
OIR    2025130    131400   -9.4200 -136.6200      26.6        75       126        60
OIR    2025130    131400   -9.4200 -136.6300      26.5        75       125        60
OIR    2025130    131400   -9.4200 -136.6400      26.5        75       124        60
OIR    2025130    131400   -9.4200 -136.6500      26.5        75       123        60
OIR    2025130    131400   -9.4200 -136.6600      26.5        75       122        60
OIR    2025130    131400   -9.4200 -136.6700      26.4        75       121        60
OIR    2025130    131400   -9.4200 -136.6800      26.4        75       121        60
OIR    2025130    131400   -9.4200 -136.6900      26.4        75       121        60
OIR    2025130    131400   -9.4200 -136.7000      26.3        74       120        60
OIR    2025130    131400   -9.4200 -136.7100      26.3        74       119        60
OIR    2025130    131400   -9.4200 -136.7200      26.2        74       117        60
OIR    2025130    131400   -9.4200 -136.7300      26.2        74       117        60
OIR    2025130    131400   -9.4200 -136.7400      26.2        74       117        60
OIR    2025130    131400   -9.4200 -136.7500      26.1        74       116        60
OIR    2025130    131400   -9.4200 -136.7600      26.1        74       110        60
OIR    2025130    131400   -9.4200 -136.7700      26.1        74       109        60
OIR    2025130    131400   -9.4200 -136.7800      26.0        74       110        60
OIR    2025130    131400   -9.4200 -136.7900      26.0        74       110        60
OIR    2025130    131400   -9.4200 -136.8000      25.9        73       111        60
OIR    2025130    131400   -9.4200 -136.8100      25.9        73       111        60
OIR    2025130    131400   -9.4200 -136.8200      25.8        73       112        60
OIR    2025130    131400   -9.4200 -136.8300      25.8        73       116        60
OIR    2025130    131400   -9.4200 -136.8400      25.8        73       117        60
OIR    2025130    131400   -9.4200 -136.8500      25.9        72       119        60
OIR    2025130    131400   -9.4200 -136.8600      26.2        72       117        60
OIR    2025130    131400   -9.4200 -136.8700      26.7        70       116        60
OIR    2025130    131400   -9.4200 -136.8800      27.1        68       116        60
OIR    2025130    131400   -9.4200 -136.8900      27.4        66       116        60
OIR    2025130    131400   -9.4200 -136.9000      27.6        66       116        60
OIR    2025130    131400   -9.4200 -136.9100      27.8        65       116        60
OIR    2025130    131400   -9.4200 -136.9200      27.9        65       116        60
OIR    2025130    131400   -9.4200 -136.9300      28.1        65       115        60
OIR    2025130    131400   -9.4200 -136.9400      28.2        65       115        60
OIR    2025130    131400   -9.4200 -136.9500      28.4        65       115        60
OIR    2025130    131400   -9.4200 -136.9600      28.5        65       115        60
OIR    2025130    131400   -9.4200 -136.9700      28.6        65       115        60
OIR    2025130    131400   -9.4200 -136.9800      28.6        65       114        60
OIR    2025130    131400   -9.4200 -136.9900      28.6        65       113        60
OIR    2025130    131400   -9.4200 -137.0000      28.6        65       113        60
OIR    2025130    131400   -9.4200 -137.0100      28.6        65       113        60
OIR    2025130    131400   -9.4200 -137.0200      28.6        65       113        60
OIR    2025130    131400   -9.4200 -137.0300      28.6        65       112        60
OIR    2025130    131400   -9.4200 -137.0400      28.6        65       111        60
OIR    2025130    131400   -9.4200 -137.0500      28.7        65       112        60
OIR    2025130    131400   -9.4200 -137.0600      28.7        65       112        60
OIR    2025130    131400   -9.4200 -137.0700      28.7        65       112        60
OIR    2025130    131400   -9.4200 -137.0800      28.7        65       112        60
OIR    2025130    131400   -9.4200 -137.0900      28.7        65       111        60
OIR    2025130    131400   -9.4200 -137.1000      28.7        65       111        60
OIR    2025130    131400   -9.4200 -137.1100      28.7        65       110        60
OIR    2025130    131400   -9.4200 -137.1200      28.7        65       111        60
OIR    2025130    131400   -9.4200 -137.1300      28.7        65       112        60
OIR    2025130    131400   -9.4200 -137.1400      28.7        65       115        60
OIR    2025130    131400   -9.4200 -137.1500      28.7        65       116        60
OIR    2025130    131400   -9.4200 -137.1600      28.7        65       116        60
OIR    2025130    131400   -9.4200 -137.1700      28.6        64       116        60
OIR    2025130    131400   -9.4200 -137.1800      28.6        64       115        60
OIR    2025130    131400   -9.4200 -137.1900      28.5        64       113        60
OIR    2025130    131400   -9.4200 -137.2000      28.4        64       112        60
OIR    2025130    131400   -9.4200 -137.2100      28.2        64       111        60
OIR    2025130    131400   -9.4200 -137.2200      28.1        63       110        60
OIR    2025130    131400   -9.4200 -137.2300      27.9        63       109        60
OIR    2025130    131400   -9.4200 -137.2400      27.8        63       108        60
OIR    2025130    131400   -9.4200 -137.2500      27.8        63       104        60
OIR    2025130    131400   -9.4200 -137.2600      27.7        63       103        60
OIR    2025130    131400   -9.4200 -137.2700      27.7        63       103        60
OIR    2025130    131400   -9.4200 -137.2800      27.7        63       103        60
OIR    2025130    131400   -9.4200 -137.2900      27.6        63       103        60
OIR    2025130    131400   -9.4200 -137.3000      27.6        63       103        60
OIR    2025130    131400   -9.4200 -137.3100      27.5        63       103        60
OIR    2025130    131400   -9.4200 -137.3200      27.5        63       103        60
OIR    2025130    131400   -9.4200 -137.3300      27.4        63       103        60
OIR    2025130    131400   -9.4200 -137.3400      27.3        63       103        60
OIR    2025130    131400   -9.4200 -137.3500      26.5        63       103        60
OIR    2025130    131400   -9.4200 -137.3600      25.6        63       103        60
OIR    2025130    131400   -9.4200 -137.3700      24.7        63       103        60
OIR    2025130    131400   -9.4200 -137.3800      23.6        64       103        60
OIR    2025130    131400   -9.4200 -137.3900      21.8        64       103        60
OIR    2025130    131400   -9.4200 -137.4000      20.6        65       103        60
OIR    2025130    131400   -9.4200 -137.4100      19.2        66       103        60
OIR    2025130    131400   -9.4200 -137.4200      17.9        68       103        60
OIR    2025130    131400   -9.4200 -137.4300      16.6        69       103        60
OIR    2025130    131400   -9.4200 -137.4400      15.1        71       103        60
OIR    2025130    131400   -9.4200 -137.4500      12.8        73       103        60
OIR    2025130    131400   -9.4200 -137.4600      10.1        75       103        60
OIR    2025130    131400   -9.4200 -137.4700       7.9        77       103        60
OIR    2025130    131400   -9.4200 -137.4800       6.1        76       103        60
OIR    2025130    131400   -9.4200 -137.4900       4.7        74       103        60
OIR    2025130    131400   -9.4200 -137.6800       4.3       302       104        60
OIR    2025130    131400   -9.4200 -137.6900       4.9       295       105        60
OIR    2025130    131400   -9.4200 -137.7000       5.3       292       108        60
OIR    2025130    131400   -9.4200 -137.7100       5.5       290       109        60
OIR    2025130    131400   -9.4200 -137.7200       5.5       289       109        60
OIR    2025130    131400   -9.4200 -137.7300       5.6       288       108        60
OIR    2025130    131400   -9.4200 -137.7400       5.7       288       107        60
OIR    2025130    131400   -9.4200 -137.7500       5.7       288       107        60
OIR    2025130    131400   -9.4200 -137.7600       5.8       288       107        60
OIR    2025130    131400   -9.4200 -137.7700       5.9       288       108        60
OIR    2025130    131400   -9.4200 -137.7800       6.0       288       108        60
OIR    2025130    131400   -9.4200 -137.7900       6.1       287       107        60
OIR    2025130    131400   -9.4200 -137.8000       6.3       287       105        60
OIR    2025130    131400   -9.4200 -137.8100       7.5       282       104        60
OIR    2025130    131400   -9.4200 -137.8200       9.3       279       104        60
OIR    2025130    131400   -9.4200 -137.8300       9.5       279       108        60
OIR    2025130    131400   -9.4200 -137.8400       9.5       279       111        60
OIR    2025130    131400   -9.4200 -137.8500       9.6       279       112        60
OIR    2025130    131400   -9.4200 -137.8600       9.6       279       113        60
OIR    2025130    131400   -9.4200 -137.8700       9.6       279       114        60
OIR    2025130    131400   -9.4200 -137.8800       9.7       280       115        60
OIR    2025130    131400   -9.4200 -137.8900       9.8       280       115        60
OIR    2025130    131400   -9.4200 -137.9000      10.1       282       116        60
OIR    2025130    131400   -9.4200 -137.9100      10.4       284       115        60
OIR    2025130    131400   -9.4200 -137.9200      10.9       286       115        60
OIR    2025130    131400   -9.4200 -137.9300      11.7       287       116        60
OIR    2025130    131400   -9.4200 -137.9400      12.6       289       115        60
OIR    2025130    131400   -9.4200 -137.9500      13.5       291       114        60
OIR    2025130    131400   -9.4200 -137.9600      14.1       294       115        60
OIR    2025130    131400   -9.4200 -137.9700      14.8       298       116        60
OIR    2025130    131400   -9.4200 -137.9800      15.5       302       117        60
OIR    2025130    131400   -9.4200 -137.9900      15.8       305       119        60
OIR    2025130    131400   -9.4200 -138.0000      15.8       307       116        60
OIR    2025130    131400   -9.4200 -138.0100      15.5       310       116        60
OIR    2025130    131400   -9.4200 -138.0200      15.4       312       116        60
OIR    2025130    131400   -9.4200 -138.0300      15.4       314       116        60
OIR    2025130    131400   -9.4200 -138.0400      15.7       316       116        60
OIR    2025130    131400   -9.4200 -138.0500      15.9       318       117        60
OIR    2025130    131400   -9.4200 -138.0600      16.0       319       121        60
OIR    2025130    131400   -9.4200 -138.0700      16.2       320       124        60
OIR    2025130    131400   -9.4200 -138.0800      16.4       322       127        60
OIR    2025130    131400   -9.4200 -138.0900      16.5       324       128        60
OIR    2025130    131400   -9.4200 -138.1000      16.6       325       130        60
OIR    2025130    131400   -9.4200 -138.1100      16.7       325       133        60
OIR    2025130    131400   -9.4200 -138.1200      17.1       325       135        60
OIR    2025130    131400   -9.4200 -138.1300      17.4       325       136        60
OIR    2025130    131400   -9.4200 -138.1400      17.6       325       139        60
OIR    2025130    131400   -9.4200 -138.1500      17.9       325       143        60
OIR    2025130    131400   -9.4200 -138.1600      18.2       325       144        60
OIR    2025130    131400   -9.4200 -138.1700      18.4       325       145        60
OIR    2025130    131400   -9.4200 -138.1800      18.8       325       148        60
OIR    2025130    131400   -9.4200 -138.3200      20.5       338       146        60
OIR    2025130    131400   -9.4200 -138.3300      21.9       337       146        60
OIR    2025130    131400   -9.4200 -138.3400      22.9       339       140        60
OIR    2025130    131400   -9.4200 -138.3500      23.8       342       132        60
OIR    2025130    131400   -9.4200 -138.3600      24.2       343       125        60
OIR    2025130    131400   -9.4200 -138.3700      24.3       343       120        60
OIR    2025130    131400   -9.4200 -138.3800      24.7       343       117        60
OIR    2025130    131400   -9.4200 -138.3900      25.2       343       116        60
OIR    2025130    131400   -9.4200 -138.4000      26.3       345       114        60
OIR    2025130    131400   -9.4200 -138.4100      27.3       347       111        60
OIR    2025130    131400   -9.4200 -138.4200      28.3       350       113        60
OIR    2025130    131400   -9.4200 -138.4300      29.3       352       113        60
OIR    2025130    131400   -9.4200 -138.4400      30.4       354       112        60
OIR    2025130    131400   -9.4200 -138.4500      30.9       355       111        60
OIR    2025130    131400   -9.4200 -138.4600      31.1       355       110        60
OIR    2025130    131400   -9.4200 -138.4700      31.2       355       111        60
OIR    2025130    131400   -9.4200 -138.4800      31.3       355       115        60
OIR    2025130    131400   -9.4200 -138.4900      31.3       355       116        60
OIR    2025130    131400   -9.4200 -138.5000      31.4       355       116        60
OIR    2025130    131400   -9.4200 -138.5100      31.4       355       114        60
OIR    2025130    131400   -9.4200 -138.5200      31.3       355       112        60
OIR    2025130    131400   -9.4200 -138.5300      31.3       355       114        60
OIR    2025130    131400   -9.4200 -138.5400      31.1       355       115        60
OIR    2025130    131400   -9.4200 -138.5500      30.6       354       116        60
OIR    2025130    131400   -9.4200 -138.5600      29.2       352       114        60
OIR    2025130    131400   -9.4200 -138.5700      26.1       347       111        60
OIR    2025130    131400   -9.4200 -138.5800      23.6       342       110        60
OIR    2025130    131400   -9.4200 -138.5900      23.0       339       109        60
OIR    2025130    131400   -9.4200 -138.6000      23.6       337       110        60
OIR    2025130    131400   -9.4200 -138.6100      26.0       335       111        60
OIR    2025130    131400   -9.4200 -138.6200      27.4       335       113        60
OIR    2025130    131400   -9.4200 -138.6300      29.0       335       115        60
OIR    2025130    131400   -9.4200 -138.6400      30.4       336       116        60
OIR    2025130    131400   -9.4200 -138.6500      31.3       337       120        60
OIR    2025130    131400   -9.4200 -138.6600      31.6       338       126        60
OIR    2025130    131400   -9.4200 -138.6700      31.6       338       132        60
OIR    2025130    131400   -9.4200 -138.6800      31.3       338       138        60
OIR    2025130    131400   -9.4200 -138.6900      30.1       339       140        60
OIR    2025130    131400   -9.4200 -138.7000      28.9       340       138        60
OIR    2025130    131400   -9.4200 -138.7100      25.7       339       145        60
OIR    2025130    131400   -9.4300 -136.1200      43.8        83       145        60
OIR    2025130    131400   -9.4300 -136.1900      39.3        76       146        60
OIR    2025130    131400   -9.4300 -136.2000      39.3        76       144        60
OIR    2025130    131400   -9.4300 -136.2100      39.4        76       142        60
OIR    2025130    131400   -9.4300 -136.2200      39.4        76       142        60
OIR    2025130    131400   -9.4300 -136.2300      39.4        76       142        60
OIR    2025130    131400   -9.4300 -136.2400      39.4        76       145        60
OIR    2025130    131400   -9.4300 -136.2500      39.4        76       145        60
OIR    2025130    131400   -9.4300 -136.2600      39.4        76       142        60
OIR    2025130    131400   -9.4300 -136.2700      39.4        76       140        60
OIR    2025130    131400   -9.4300 -136.2800      39.5        76       140        60
OIR    2025130    131400   -9.4300 -136.2900      39.5        76       140        60
OIR    2025130    131400   -9.4300 -136.3000      39.6        76       141        60
OIR    2025130    131400   -9.4300 -136.3100      39.6        77       141        60
OIR    2025130    131400   -9.4300 -136.3200      39.7        77       140        60
OIR    2025130    131400   -9.4300 -136.3300      39.9        77       142        60
OIR    2025130    131400   -9.4300 -136.3400      40.0        78       144        60
OIR    2025130    131400   -9.4300 -136.3500      40.0        78       145        60
OIR    2025130    131400   -9.4300 -136.4300      40.0        79       141        60
OIR    2025130    131400   -9.4300 -136.4400      40.0        79       137        60
OIR    2025130    131400   -9.4300 -136.4500      40.0        79       134        60
OIR    2025130    131400   -9.4300 -136.4600      40.0        79       132        60
OIR    2025130    131400   -9.4300 -136.4700      40.0        79       132        60
OIR    2025130    131400   -9.4300 -136.4800      40.0        79       133        60
OIR    2025130    131400   -9.4300 -136.4900      39.9        79       134        60
OIR    2025130    131400   -9.4300 -136.5000      39.9        79       136        60
OIR    2025130    131400   -9.4300 -136.5100      39.9        79       139        60
OIR    2025130    131400   -9.4300 -136.5200      39.7        79       140        60
OIR    2025130    131400   -9.4300 -136.5300      39.3        79       138        60
OIR    2025130    131400   -9.4300 -136.5400      38.2        79       135        60
OIR    2025130    131400   -9.4300 -136.5500      35.4        79       133        60
OIR    2025130    131400   -9.4300 -136.5600      29.7        77       133        60
OIR    2025130    131400   -9.4300 -136.5700      27.2        76       132        60
OIR    2025130    131400   -9.4300 -136.5800      26.8        75       130        60
OIR    2025130    131400   -9.4300 -136.5900      26.7        75       130        60
OIR    2025130    131400   -9.4300 -136.6000      26.6        75       130        60
OIR    2025130    131400   -9.4300 -136.6100      26.6        75       128        60
OIR    2025130    131400   -9.4300 -136.6200      26.6        75       127        60
OIR    2025130    131400   -9.4300 -136.6300      26.6        75       126        60
OIR    2025130    131400   -9.4300 -136.6400      26.5        75       125        60
OIR    2025130    131400   -9.4300 -136.6500      26.5        75       124        60
OIR    2025130    131400   -9.4300 -136.6600      26.5        75       122        60
OIR    2025130    131400   -9.4300 -136.6700      26.5        75       121        60
OIR    2025130    131400   -9.4300 -136.6800      26.4        75       121        60
OIR    2025130    131400   -9.4300 -136.6900      26.4        75       121        60
OIR    2025130    131400   -9.4300 -136.7000      26.4        74       121        60
OIR    2025130    131400   -9.4300 -136.7100      26.3        74       121        60
OIR    2025130    131400   -9.4300 -136.7200      26.3        74       117        60
OIR    2025130    131400   -9.4300 -136.7300      26.2        74       117        60
OIR    2025130    131400   -9.4300 -136.7400      26.2        74       117        60
OIR    2025130    131400   -9.4300 -136.7500      26.2        74       116        60
OIR    2025130    131400   -9.4300 -136.7600      26.1        74       110        60
OIR    2025130    131400   -9.4300 -136.7700      26.1        74       110        60
OIR    2025130    131400   -9.4300 -136.7800      26.1        74       111        60
OIR    2025130    131400   -9.4300 -136.7900      26.0        74       111        60
OIR    2025130    131400   -9.4300 -136.8000      26.0        73       111        60
OIR    2025130    131400   -9.4300 -136.8100      25.9        73       111        60
OIR    2025130    131400   -9.4300 -136.8200      25.9        73       112        60
OIR    2025130    131400   -9.4300 -136.8300      25.9        73       116        60
OIR    2025130    131400   -9.4300 -136.8400      25.9        73       116        60
OIR    2025130    131400   -9.4300 -136.8500      26.1        72       117        60
OIR    2025130    131400   -9.4300 -136.8600      26.7        71       116        60
OIR    2025130    131400   -9.4300 -136.8700      27.2        69       114        60
OIR    2025130    131400   -9.4300 -136.8800      27.5        67       116        60
OIR    2025130    131400   -9.4300 -136.8900      27.6        66       116        60
OIR    2025130    131400   -9.4300 -136.9000      27.8        65       116        60
OIR    2025130    131400   -9.4300 -136.9100      27.9        65       116        60
OIR    2025130    131400   -9.4300 -136.9200      28.0        65       115        60
OIR    2025130    131400   -9.4300 -136.9300      28.1        65       114        60
OIR    2025130    131400   -9.4300 -136.9400      28.2        65       114        60
OIR    2025130    131400   -9.4300 -136.9500      28.4        65       114        60
OIR    2025130    131400   -9.4300 -136.9600      28.5        65       115        60
OIR    2025130    131400   -9.4300 -136.9700      28.6        65       116        60
OIR    2025130    131400   -9.4300 -136.9800      28.6        65       116        60
OIR    2025130    131400   -9.4300 -136.9900      28.6        65       115        60
OIR    2025130    131400   -9.4300 -137.0000      28.6        65       114        60
OIR    2025130    131400   -9.4300 -137.0100      28.6        65       114        60
OIR    2025130    131400   -9.4300 -137.0200      28.6        65       114        60
OIR    2025130    131400   -9.4300 -137.0300      28.6        65       114        60
OIR    2025130    131400   -9.4300 -137.0400      28.6        65       113        60
OIR    2025130    131400   -9.4300 -137.0500      28.7        65       113        60
OIR    2025130    131400   -9.4300 -137.0600      28.7        65       113        60
OIR    2025130    131400   -9.4300 -137.0700      28.7        65       112        60
OIR    2025130    131400   -9.4300 -137.0800      28.7        65       112        60
OIR    2025130    131400   -9.4300 -137.0900      28.7        65       112        60
OIR    2025130    131400   -9.4300 -137.1000      28.7        65       112        60
OIR    2025130    131400   -9.4300 -137.1100      28.7        65       112        60
OIR    2025130    131400   -9.4300 -137.1200      28.7        65       113        60
OIR    2025130    131400   -9.4300 -137.1300      28.7        65       114        60
OIR    2025130    131400   -9.4300 -137.1400      28.7        65       115        60
OIR    2025130    131400   -9.4300 -137.1500      28.7        65       116        60
OIR    2025130    131400   -9.4300 -137.1600      28.7        64       117        60
OIR    2025130    131400   -9.4300 -137.1700      28.7        64       116        60
OIR    2025130    131400   -9.4300 -137.1800      28.6        64       115        60
OIR    2025130    131400   -9.4300 -137.1900      28.5        64       114        60
OIR    2025130    131400   -9.4300 -137.2000      28.4        64       113        60
OIR    2025130    131400   -9.4300 -137.2100      28.3        64       112        60
OIR    2025130    131400   -9.4300 -137.2200      28.1        63       110        60
OIR    2025130    131400   -9.4300 -137.2300      27.9        63       109        60
OIR    2025130    131400   -9.4300 -137.2400      27.9        63       108        60
OIR    2025130    131400   -9.4300 -137.2500      27.8        63       104        60
OIR    2025130    131400   -9.4300 -137.2600      27.8        63       103        60
OIR    2025130    131400   -9.4300 -137.2700      27.7        63       103        60
OIR    2025130    131400   -9.4300 -137.2800      27.7        63       103        60
OIR    2025130    131400   -9.4300 -137.2900      27.7        63       103        60
OIR    2025130    131400   -9.4300 -137.3000      27.6        63       103        60
OIR    2025130    131400   -9.4300 -137.3100      27.6        63       103        60
OIR    2025130    131400   -9.4300 -137.3200      27.5        63       103        60
OIR    2025130    131400   -9.4300 -137.3300      27.4        63       103        60
OIR    2025130    131400   -9.4300 -137.3400      27.3        63       103        60
OIR    2025130    131400   -9.4300 -137.3500      26.6        63       103        60
OIR    2025130    131400   -9.4300 -137.3600      25.8        64       103        60
OIR    2025130    131400   -9.4300 -137.3700      25.0        64       103        60
OIR    2025130    131400   -9.4300 -137.3800      24.0        65       103        60
OIR    2025130    131400   -9.4300 -137.3900      22.3        66       103        60
OIR    2025130    131400   -9.4300 -137.4000      21.1        67       103        60
OIR    2025130    131400   -9.4300 -137.4100      19.9        68       103        60
OIR    2025130    131400   -9.4300 -137.4200      18.6        69       103        60
OIR    2025130    131400   -9.4300 -137.4300      17.3        70       103        60
OIR    2025130    131400   -9.4300 -137.4400      15.9        72       103        60
OIR    2025130    131400   -9.4300 -137.4500      14.1        74       103        60
OIR    2025130    131400   -9.4300 -137.4600      11.5        76       103        60
OIR    2025130    131400   -9.4300 -137.4700       9.3        78       103        60
OIR    2025130    131400   -9.4300 -137.4800       7.6        78       103        60
OIR    2025130    131400   -9.4300 -137.4900       6.2        78       103        60
OIR    2025130    131400   -9.4300 -137.5000       5.1        77       103        60
OIR    2025130    131400   -9.4300 -137.5100       4.0        76       103        60
OIR    2025130    131400   -9.4300 -137.6800       4.3       312       104        60
OIR    2025130    131400   -9.4300 -137.6900       4.6       307       105        60
OIR    2025130    131400   -9.4300 -137.7000       5.1       299       107        60
OIR    2025130    131400   -9.4300 -137.7100       5.3       294       109        60
OIR    2025130    131400   -9.4300 -137.7200       5.5       292       108        60
OIR    2025130    131400   -9.4300 -137.7300       5.5       290       107        60
OIR    2025130    131400   -9.4300 -137.7400       5.6       289       105        60
OIR    2025130    131400   -9.4300 -137.7500       5.7       289       104        60
OIR    2025130    131400   -9.4300 -137.7600       5.8       289       105        60
OIR    2025130    131400   -9.4300 -137.7700       5.8       289       108        60
OIR    2025130    131400   -9.4300 -137.7800       6.0       289       107        60
OIR    2025130    131400   -9.4300 -137.7900       6.1       289       104        60
OIR    2025130    131400   -9.4300 -137.8000       6.2       288       104        60
OIR    2025130    131400   -9.4300 -137.8100       7.5       283       103        60
OIR    2025130    131400   -9.4300 -137.8200       9.2       280       103        60
OIR    2025130    131400   -9.4300 -137.8300       9.5       279       105        60
OIR    2025130    131400   -9.4300 -137.8400       9.5       279       109        60
OIR    2025130    131400   -9.4300 -137.8500       9.6       279       110        60
OIR    2025130    131400   -9.4300 -137.8600       9.6       279       111        60
OIR    2025130    131400   -9.4300 -137.8700       9.7       280       113        60
OIR    2025130    131400   -9.4300 -137.8800       9.9       281       116        60
OIR    2025130    131400   -9.4300 -137.8900      10.2       283       116        60
OIR    2025130    131400   -9.4300 -137.9000      10.6       285       116        60
OIR    2025130    131400   -9.4300 -137.9100      11.0       287       116        60
OIR    2025130    131400   -9.4300 -137.9200      11.7       290       116        60
OIR    2025130    131400   -9.4300 -137.9300      12.7       293       116        60
OIR    2025130    131400   -9.4300 -137.9400      14.1       295       114        60
OIR    2025130    131400   -9.4300 -137.9500      15.2       298       113        60
OIR    2025130    131400   -9.4300 -137.9600      15.9       301       115        60
OIR    2025130    131400   -9.4300 -137.9700      16.3       304       116        60
OIR    2025130    131400   -9.4300 -137.9800      16.7       306       117        60
OIR    2025130    131400   -9.4300 -137.9900      17.0       308       120        60
OIR    2025130    131400   -9.4300 -138.0000      16.9       310       117        60
OIR    2025130    131400   -9.4300 -138.0100      16.8       312       117        60
OIR    2025130    131400   -9.4300 -138.0200      16.7       314       119        60
OIR    2025130    131400   -9.4300 -138.0300      16.8       315       119        60
OIR    2025130    131400   -9.4300 -138.0400      17.0       317       116        60
OIR    2025130    131400   -9.4300 -138.0500      17.0       318       117        60
OIR    2025130    131400   -9.4300 -138.0600      17.0       319       120        60
OIR    2025130    131400   -9.4300 -138.0700      17.1       320       123        60
OIR    2025130    131400   -9.4300 -138.0800      17.1       322       125        60
OIR    2025130    131400   -9.4300 -138.0900      17.1       323       125        60
OIR    2025130    131400   -9.4300 -138.1000      17.2       324       127        60
OIR    2025130    131400   -9.4300 -138.1100      17.5       323       131        60
OIR    2025130    131400   -9.4300 -138.1200      18.0       323       134        60
OIR    2025130    131400   -9.4300 -138.1300      18.4       323       135        60
OIR    2025130    131400   -9.4300 -138.1400      18.6       323       137        60
OIR    2025130    131400   -9.4300 -138.1500      18.9       323       139        60
OIR    2025130    131400   -9.4300 -138.1600      19.2       323       141        60
OIR    2025130    131400   -9.4300 -138.1700      19.6       323       143        60
OIR    2025130    131400   -9.4300 -138.1800      20.1       323       145        60
OIR    2025130    131400   -9.4300 -138.1900      20.6       323       147        60
OIR    2025130    131400   -9.4300 -138.3100      18.5       331       148        60
OIR    2025130    131400   -9.4300 -138.3200      19.6       332       143        60
OIR    2025130    131400   -9.4300 -138.3300      20.6       332       144        60
OIR    2025130    131400   -9.4300 -138.3400      21.5       332       142        60
OIR    2025130    131400   -9.4300 -138.3500      22.4       334       139        60
OIR    2025130    131400   -9.4300 -138.3600      23.2       336       132        60
OIR    2025130    131400   -9.4300 -138.3700      23.8       337       123        60
OIR    2025130    131400   -9.4300 -138.3800      24.4       338       121        60
OIR    2025130    131400   -9.4300 -138.3900      24.9       338       120        60
OIR    2025130    131400   -9.4300 -138.4000      25.6       340       117        60
OIR    2025130    131400   -9.4300 -138.4100      26.3       343       116        60
OIR    2025130    131400   -9.4300 -138.4200      27.0       346       116        60
OIR    2025130    131400   -9.4300 -138.4300      28.0       348       116        60
OIR    2025130    131400   -9.4300 -138.4400      29.1       351       115        60
OIR    2025130    131400   -9.4300 -138.4500      29.8       353       114        60
OIR    2025130    131400   -9.4300 -138.4600      30.3       355       112        60
OIR    2025130    131400   -9.4300 -138.4700      30.5       355       114        60
OIR    2025130    131400   -9.4300 -138.4800      30.9       355       120        60
OIR    2025130    131400   -9.4300 -138.4900      31.2       355       121        60
OIR    2025130    131400   -9.4300 -138.5000      31.4       355       120        60
OIR    2025130    131400   -9.4300 -138.5100      31.3       355       117        60
OIR    2025130    131400   -9.4300 -138.5200      31.0       355       115        60
OIR    2025130    131400   -9.4300 -138.5300      30.5       354       121        60
OIR    2025130    131400   -9.4300 -138.5400      29.7       353       124        60
OIR    2025130    131400   -9.4300 -138.5500      28.4       351       124        60
OIR    2025130    131400   -9.4300 -138.5600      25.6       346       121        60
OIR    2025130    131400   -9.4300 -138.5700      22.9       341       117        60
OIR    2025130    131400   -9.4300 -138.5800      21.7       337       116        60
OIR    2025130    131400   -9.4300 -138.5900      21.5       335       115        60
OIR    2025130    131400   -9.4300 -138.6000      21.8       335       116        60
OIR    2025130    131400   -9.4300 -138.6100      23.2       334       119        60
OIR    2025130    131400   -9.4300 -138.6200      25.7       335       123        60
OIR    2025130    131400   -9.4300 -138.6300      27.1       335       126        60
OIR    2025130    131400   -9.4300 -138.6400      28.8       336       125        60
OIR    2025130    131400   -9.4300 -138.6500      30.1       337       127        60
OIR    2025130    131400   -9.4300 -138.6600      31.2       338       131        60
OIR    2025130    131400   -9.4300 -138.6700      30.9       339       137        60
OIR    2025130    131400   -9.4300 -138.6800      30.1       341       142        60
OIR    2025130    131400   -9.4300 -138.6900      28.4       343       147        60
OIR    2025130    131400   -9.4400 -136.1200      43.8        83       146        60
OIR    2025130    131400   -9.4400 -136.1900      39.3        76       144        60
OIR    2025130    131400   -9.4400 -136.2000      39.3        76       142        60
OIR    2025130    131400   -9.4400 -136.2100      39.3        76       141        60
OIR    2025130    131400   -9.4400 -136.2200      39.4        76       141        60
OIR    2025130    131400   -9.4400 -136.2300      39.4        76       141        60
OIR    2025130    131400   -9.4400 -136.2400      39.4        76       142        60
OIR    2025130    131400   -9.4400 -136.2500      39.4        76       141        60
OIR    2025130    131400   -9.4400 -136.2600      39.4        76       139        60
OIR    2025130    131400   -9.4400 -136.2700      39.4        76       137        60
OIR    2025130    131400   -9.4400 -136.2800      39.4        76       138        60
OIR    2025130    131400   -9.4400 -136.2900      39.5        76       138        60
OIR    2025130    131400   -9.4400 -136.3000      39.5        77       138        60
OIR    2025130    131400   -9.4400 -136.3100      39.6        77       138        60
OIR    2025130    131400   -9.4400 -136.3200      39.8        77       137        60
OIR    2025130    131400   -9.4400 -136.3300      39.9        78       140        60
OIR    2025130    131400   -9.4400 -136.3400      39.9        78       144        60
OIR    2025130    131400   -9.4400 -136.3500      40.0        78       146        60
OIR    2025130    131400   -9.4400 -136.4200      40.0        79       145        60
OIR    2025130    131400   -9.4400 -136.4300      40.0        79       140        60
OIR    2025130    131400   -9.4400 -136.4400      40.0        79       137        60
OIR    2025130    131400   -9.4400 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4400 -136.4600      40.0        79       132        60
OIR    2025130    131400   -9.4400 -136.4700      39.9        79       131        60
OIR    2025130    131400   -9.4400 -136.4800      39.9        79       131        60
OIR    2025130    131400   -9.4400 -136.4900      39.9        79       132        60
OIR    2025130    131400   -9.4400 -136.5000      39.9        79       134        60
OIR    2025130    131400   -9.4400 -136.5100      39.9        79       136        60
OIR    2025130    131400   -9.4400 -136.5200      39.8        79       138        60
OIR    2025130    131400   -9.4400 -136.5300      39.2        79       138        60
OIR    2025130    131400   -9.4400 -136.5400      38.2        79       137        60
OIR    2025130    131400   -9.4400 -136.5500      36.2        79       136        60
OIR    2025130    131400   -9.4400 -136.5600      29.6        77       134        60
OIR    2025130    131400   -9.4400 -136.5700      27.2        76       133        60
OIR    2025130    131400   -9.4400 -136.5800      26.8        75       132        60
OIR    2025130    131400   -9.4400 -136.5900      26.7        75       131        60
OIR    2025130    131400   -9.4400 -136.6000      26.7        75       130        60
OIR    2025130    131400   -9.4400 -136.6100      26.6        75       128        60
OIR    2025130    131400   -9.4400 -136.6200      26.6        75       127        60
OIR    2025130    131400   -9.4400 -136.6300      26.6        75       125        60
OIR    2025130    131400   -9.4400 -136.6400      26.6        75       124        60
OIR    2025130    131400   -9.4400 -136.6500      26.5        75       123        60
OIR    2025130    131400   -9.4400 -136.6600      26.5        75       122        60
OIR    2025130    131400   -9.4400 -136.6700      26.5        75       120        60
OIR    2025130    131400   -9.4400 -136.6800      26.5        75       120        60
OIR    2025130    131400   -9.4400 -136.6900      26.4        74       121        60
OIR    2025130    131400   -9.4400 -136.7000      26.4        74       121        60
OIR    2025130    131400   -9.4400 -136.7100      26.3        74       120        60
OIR    2025130    131400   -9.4400 -136.7200      26.3        74       117        60
OIR    2025130    131400   -9.4400 -136.7300      26.2        74       116        60
OIR    2025130    131400   -9.4400 -136.7400      26.2        74       116        60
OIR    2025130    131400   -9.4400 -136.7500      26.2        74       114        60
OIR    2025130    131400   -9.4400 -136.7600      26.1        74       109        60
OIR    2025130    131400   -9.4400 -136.7700      26.1        74       109        60
OIR    2025130    131400   -9.4400 -136.7800      26.1        74       110        60
OIR    2025130    131400   -9.4400 -136.7900      26.1        73       111        60
OIR    2025130    131400   -9.4400 -136.8000      26.0        73       111        60
OIR    2025130    131400   -9.4400 -136.8100      26.0        73       111        60
OIR    2025130    131400   -9.4400 -136.8200      26.0        73       112        60
OIR    2025130    131400   -9.4400 -136.8300      26.0        73       114        60
OIR    2025130    131400   -9.4400 -136.8400      26.0        72       115        60
OIR    2025130    131400   -9.4400 -136.8500      26.4        71       115        60
OIR    2025130    131400   -9.4400 -136.8600      27.1        69       114        60
OIR    2025130    131400   -9.4400 -136.8700      27.5        67       113        60
OIR    2025130    131400   -9.4400 -136.8800      27.7        66       113        60
OIR    2025130    131400   -9.4400 -136.8900      27.7        65       114        60
OIR    2025130    131400   -9.4400 -136.9000      27.8        65       113        60
OIR    2025130    131400   -9.4400 -136.9100      27.9        65       113        60
OIR    2025130    131400   -9.4400 -136.9200      28.0        65       112        60
OIR    2025130    131400   -9.4400 -136.9300      28.1        65       112        60
OIR    2025130    131400   -9.4400 -136.9400      28.3        65       112        60
OIR    2025130    131400   -9.4400 -136.9500      28.4        64       112        60
OIR    2025130    131400   -9.4400 -136.9600      28.5        64       112        60
OIR    2025130    131400   -9.4400 -136.9700      28.5        64       113        60
OIR    2025130    131400   -9.4400 -136.9800      28.6        64       114        60
OIR    2025130    131400   -9.4400 -136.9900      28.6        65       113        60
OIR    2025130    131400   -9.4400 -137.0000      28.6        65       112        60
OIR    2025130    131400   -9.4400 -137.0100      28.6        65       112        60
OIR    2025130    131400   -9.4400 -137.0200      28.6        65       112        60
OIR    2025130    131400   -9.4400 -137.0300      28.6        65       112        60
OIR    2025130    131400   -9.4400 -137.0400      28.6        65       113        60
OIR    2025130    131400   -9.4400 -137.0500      28.7        65       114        60
OIR    2025130    131400   -9.4400 -137.0600      28.7        65       113        60
OIR    2025130    131400   -9.4400 -137.0700      28.7        65       112        60
OIR    2025130    131400   -9.4400 -137.0800      28.7        65       111        60
OIR    2025130    131400   -9.4400 -137.0900      28.7        65       110        60
OIR    2025130    131400   -9.4400 -137.1000      28.7        65       111        60
OIR    2025130    131400   -9.4400 -137.1100      28.7        65       112        60
OIR    2025130    131400   -9.4400 -137.1200      28.7        65       112        60
OIR    2025130    131400   -9.4400 -137.1300      28.7        65       112        60
OIR    2025130    131400   -9.4400 -137.1400      28.7        65       112        60
OIR    2025130    131400   -9.4400 -137.1500      28.7        65       113        60
OIR    2025130    131400   -9.4400 -137.1600      28.7        64       114        60
OIR    2025130    131400   -9.4400 -137.1700      28.7        64       114        60
OIR    2025130    131400   -9.4400 -137.1800      28.7        64       113        60
OIR    2025130    131400   -9.4400 -137.1900      28.6        64       112        60
OIR    2025130    131400   -9.4400 -137.2000      28.4        64       112        60
OIR    2025130    131400   -9.4400 -137.2100      28.3        64       111        60
OIR    2025130    131400   -9.4400 -137.2200      28.1        63       109        60
OIR    2025130    131400   -9.4400 -137.2300      28.0        63       108        60
OIR    2025130    131400   -9.4400 -137.2400      27.9        63       105        60
OIR    2025130    131400   -9.4400 -137.2500      27.9        63       104        60
OIR    2025130    131400   -9.4400 -137.2600      27.8        63       103        60
OIR    2025130    131400   -9.4400 -137.2700      27.8        63       103        60
OIR    2025130    131400   -9.4400 -137.2800      27.8        63       103        60
OIR    2025130    131400   -9.4400 -137.2900      27.7        63       103        60
OIR    2025130    131400   -9.4400 -137.3000      27.7        63       103        60
OIR    2025130    131400   -9.4400 -137.3100      27.6        63       103        60
OIR    2025130    131400   -9.4400 -137.3200      27.6        63       103        60
OIR    2025130    131400   -9.4400 -137.3300      27.5        63       103        60
OIR    2025130    131400   -9.4400 -137.3400      27.3        63       103        60
OIR    2025130    131400   -9.4400 -137.3500      26.8        64       103        60
OIR    2025130    131400   -9.4400 -137.3600      25.9        64       103        60
OIR    2025130    131400   -9.4400 -137.3700      25.1        65       103        60
OIR    2025130    131400   -9.4400 -137.3800      24.3        65       103        60
OIR    2025130    131400   -9.4400 -137.3900      22.8        67       103        60
OIR    2025130    131400   -9.4400 -137.4000      21.6        67       103        60
OIR    2025130    131400   -9.4400 -137.4100      20.7        68       103        60
OIR    2025130    131400   -9.4400 -137.4200      19.6        68       103        60
OIR    2025130    131400   -9.4400 -137.4300      18.3        69       103        60
OIR    2025130    131400   -9.4400 -137.4400      16.9        71       103        60
OIR    2025130    131400   -9.4400 -137.4500      15.3        72       103        60
OIR    2025130    131400   -9.4400 -137.4600      12.9        74       103        60
OIR    2025130    131400   -9.4400 -137.4700      10.6        76       103        60
OIR    2025130    131400   -9.4400 -137.4800       8.9        78       103        60
OIR    2025130    131400   -9.4400 -137.4900       7.4        79       103        60
OIR    2025130    131400   -9.4400 -137.5000       6.3        80       103        60
OIR    2025130    131400   -9.4400 -137.5100       5.1        80       103        60
OIR    2025130    131400   -9.4400 -137.5200       4.1        80       103        60
OIR    2025130    131400   -9.4400 -137.6700       4.3       329       103        60
OIR    2025130    131400   -9.4400 -137.6800       4.6       328       104        60
OIR    2025130    131400   -9.4400 -137.6900       4.8       322       104        60
OIR    2025130    131400   -9.4400 -137.7000       5.0       314       105        60
OIR    2025130    131400   -9.4400 -137.7100       5.2       304       108        60
OIR    2025130    131400   -9.4400 -137.7200       5.3       298       107        60
OIR    2025130    131400   -9.4400 -137.7300       5.5       294       104        60
OIR    2025130    131400   -9.4400 -137.7400       5.6       292       104        60
OIR    2025130    131400   -9.4400 -137.7500       5.7       291       103        60
OIR    2025130    131400   -9.4400 -137.7600       5.8       291       105        60
OIR    2025130    131400   -9.4400 -137.7700       5.8       291       107        60
OIR    2025130    131400   -9.4400 -137.7800       5.9       290       104        60
OIR    2025130    131400   -9.4400 -137.7900       6.0       290       104        60
OIR    2025130    131400   -9.4400 -137.8000       6.2       289       103        60
OIR    2025130    131400   -9.4400 -137.8100       7.4       285       103        60
OIR    2025130    131400   -9.4400 -137.8200       8.7       282       103        60
OIR    2025130    131400   -9.4400 -137.8300       9.4       280       104        60
OIR    2025130    131400   -9.4400 -137.8400       9.5       280       105        60
OIR    2025130    131400   -9.4400 -137.8500       9.6       280       105        60
OIR    2025130    131400   -9.4400 -137.8600       9.7       280       107        60
OIR    2025130    131400   -9.4400 -137.8700       9.9       283       109        60
OIR    2025130    131400   -9.4400 -137.8800      10.3       286       112        60
OIR    2025130    131400   -9.4400 -137.8900      10.8       287       112        60
OIR    2025130    131400   -9.4400 -137.9000      11.3       290       113        60
OIR    2025130    131400   -9.4400 -137.9100      12.0       293       113        60
OIR    2025130    131400   -9.4400 -137.9200      12.8       295       113        60
OIR    2025130    131400   -9.4400 -137.9300      14.0       298       111        60
OIR    2025130    131400   -9.4400 -137.9400      15.4       301       111        60
OIR    2025130    131400   -9.4400 -137.9500      16.5       303       111        60
OIR    2025130    131400   -9.4400 -137.9600      17.1       306       113        60
OIR    2025130    131400   -9.4400 -137.9700      17.4       308       116        60
OIR    2025130    131400   -9.4400 -137.9800      17.8       310       116        60
OIR    2025130    131400   -9.4400 -137.9900      17.9       311       117        60
OIR    2025130    131400   -9.4400 -138.0000      17.8       313       117        60
OIR    2025130    131400   -9.4400 -138.0100      17.8       314       117        60
OIR    2025130    131400   -9.4400 -138.0200      17.8       315       117        60
OIR    2025130    131400   -9.4400 -138.0300      18.0       316       117        60
OIR    2025130    131400   -9.4400 -138.0400      18.2       317       116        60
OIR    2025130    131400   -9.4400 -138.0500      18.3       317       117        60
OIR    2025130    131400   -9.4400 -138.0600      18.3       318       119        60
OIR    2025130    131400   -9.4400 -138.0700      18.2       319       121        60
OIR    2025130    131400   -9.4400 -138.0800      18.1       321       124        60
OIR    2025130    131400   -9.4400 -138.0900      18.3       321       124        60
OIR    2025130    131400   -9.4400 -138.1000      18.5       321       126        60
OIR    2025130    131400   -9.4400 -138.1100      19.0       321       130        60
OIR    2025130    131400   -9.4400 -138.1200      19.2       321       132        60
OIR    2025130    131400   -9.4400 -138.1300      19.4       321       133        60
OIR    2025130    131400   -9.4400 -138.1400      19.6       321       135        60
OIR    2025130    131400   -9.4400 -138.1500      19.8       321       137        60
OIR    2025130    131400   -9.4400 -138.1600      20.1       321       139        60
OIR    2025130    131400   -9.4400 -138.1700      20.4       322       140        60
OIR    2025130    131400   -9.4400 -138.1800      20.8       322       143        60
OIR    2025130    131400   -9.4400 -138.1900      21.2       322       147        60
OIR    2025130    131400   -9.4400 -138.2000      21.7       321       148        60
OIR    2025130    131400   -9.4400 -138.2600      21.7       324       149        60
OIR    2025130    131400   -9.4400 -138.3100      19.2       326       144        60
OIR    2025130    131400   -9.4400 -138.3200      19.6       327       142        60
OIR    2025130    131400   -9.4400 -138.3300      20.3       327       148        60
OIR    2025130    131400   -9.4400 -138.3400      20.9       328       146        60
OIR    2025130    131400   -9.4400 -138.3500      21.7       328       141        60
OIR    2025130    131400   -9.4400 -138.3600      22.4       330       134        60
OIR    2025130    131400   -9.4400 -138.3700      23.0       331       126        60
OIR    2025130    131400   -9.4400 -138.3800      23.6       333       120        60
OIR    2025130    131400   -9.4400 -138.3900      24.1       333       116        60
OIR    2025130    131400   -9.4400 -138.4000      24.6       335       115        60
OIR    2025130    131400   -9.4400 -138.4100      25.2       337       114        60
OIR    2025130    131400   -9.4400 -138.4200      26.1       341       114        60
OIR    2025130    131400   -9.4400 -138.4300      27.0       345       114        60
OIR    2025130    131400   -9.4400 -138.4400      27.4       347       114        60
OIR    2025130    131400   -9.4400 -138.4500      27.5       348       113        60
OIR    2025130    131400   -9.4400 -138.4600      27.7       349       112        60
OIR    2025130    131400   -9.4400 -138.4700      28.0       351       115        60
OIR    2025130    131400   -9.4400 -138.4800      29.1       351       123        60
OIR    2025130    131400   -9.4400 -138.4900      30.4       351       121        60
OIR    2025130    131400   -9.4400 -138.5000      30.9       352       117        60
OIR    2025130    131400   -9.4400 -138.5100      30.4       352       116        60
OIR    2025130    131400   -9.4400 -138.5200      27.6       347       115        60
OIR    2025130    131400   -9.4400 -138.5300      25.6       345       119        60
OIR    2025130    131400   -9.4400 -138.5400      25.3       346       121        60
OIR    2025130    131400   -9.4400 -138.5500      25.4       345       122        60
OIR    2025130    131400   -9.4400 -138.5600      22.7       340       120        60
OIR    2025130    131400   -9.4400 -138.5700      21.6       336       119        60
OIR    2025130    131400   -9.4400 -138.5800      21.3       335       117        60
OIR    2025130    131400   -9.4400 -138.5900      21.3       334       116        60
OIR    2025130    131400   -9.4400 -138.6000      21.4       334       121        60
OIR    2025130    131400   -9.4400 -138.6100      21.7       334       125        60
OIR    2025130    131400   -9.4400 -138.6200      22.6       334       127        60
OIR    2025130    131400   -9.4400 -138.6300      24.5       335       129        60
OIR    2025130    131400   -9.4400 -138.6400      26.7       336       133        60
OIR    2025130    131400   -9.4400 -138.6500      27.8       337       136        60
OIR    2025130    131400   -9.4400 -138.6600      28.7       339       138        60
OIR    2025130    131400   -9.4400 -138.6700      29.4       341       140        60
OIR    2025130    131400   -9.4400 -138.6800      29.0       343       142        60
OIR    2025130    131400   -9.4400 -138.6900      27.3       345       146        60
OIR    2025130    131400   -9.4500 -136.0500      43.7        83       146        60
OIR    2025130    131400   -9.4500 -136.0600      43.7        83       142        60
OIR    2025130    131400   -9.4500 -136.1800      39.3        76       147        60
OIR    2025130    131400   -9.4500 -136.1900      39.3        76       142        60
OIR    2025130    131400   -9.4500 -136.2000      39.3        76       141        60
OIR    2025130    131400   -9.4500 -136.2100      39.3        76       140        60
OIR    2025130    131400   -9.4500 -136.2200      39.3        76       140        60
OIR    2025130    131400   -9.4500 -136.2300      39.4        76       139        60
OIR    2025130    131400   -9.4500 -136.2400      39.4        76       138        60
OIR    2025130    131400   -9.4500 -136.2500      39.4        76       137        60
OIR    2025130    131400   -9.4500 -136.2600      39.3        76       136        60
OIR    2025130    131400   -9.4500 -136.2700      39.3        76       135        60
OIR    2025130    131400   -9.4500 -136.2800      39.4        77       137        60
OIR    2025130    131400   -9.4500 -136.2900      39.4        77       137        60
OIR    2025130    131400   -9.4500 -136.3000      39.5        77       134        60
OIR    2025130    131400   -9.4500 -136.3100      39.6        77       134        60
OIR    2025130    131400   -9.4500 -136.3200      39.7        77       134        60
OIR    2025130    131400   -9.4500 -136.3300      39.8        78       138        60
OIR    2025130    131400   -9.4500 -136.3400      39.9        78       143        60
OIR    2025130    131400   -9.4500 -136.3500      39.9        78       146        60
OIR    2025130    131400   -9.4500 -136.3700      40.0        79       145        60
OIR    2025130    131400   -9.4500 -136.3800      40.0        79       144        60
OIR    2025130    131400   -9.4500 -136.4100      40.1        79       145        60
OIR    2025130    131400   -9.4500 -136.4200      40.0        79       142        60
OIR    2025130    131400   -9.4500 -136.4300      40.0        79       139        60
OIR    2025130    131400   -9.4500 -136.4400      40.0        79       136        60
OIR    2025130    131400   -9.4500 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4500 -136.4600      40.0        79       131        60
OIR    2025130    131400   -9.4500 -136.4700      39.9        79       129        60
OIR    2025130    131400   -9.4500 -136.4800      39.9        79       129        60
OIR    2025130    131400   -9.4500 -136.4900      39.9        79       129        60
OIR    2025130    131400   -9.4500 -136.5000      39.9        79       132        60
OIR    2025130    131400   -9.4500 -136.5100      39.9        79       134        60
OIR    2025130    131400   -9.4500 -136.5200      39.8        79       135        60
OIR    2025130    131400   -9.4500 -136.5300      39.5        79       138        60
OIR    2025130    131400   -9.4500 -136.5400      38.4        79       141        60
OIR    2025130    131400   -9.4500 -136.5500      37.0        79       139        60
OIR    2025130    131400   -9.4500 -136.5600      30.0        77       136        60
OIR    2025130    131400   -9.4500 -136.5700      27.2        75       134        60
OIR    2025130    131400   -9.4500 -136.5800      26.8        75       132        60
OIR    2025130    131400   -9.4500 -136.5900      26.7        75       131        60
OIR    2025130    131400   -9.4500 -136.6000      26.7        75       129        60
OIR    2025130    131400   -9.4500 -136.6100      26.7        75       127        60
OIR    2025130    131400   -9.4500 -136.6200      26.6        75       126        60
OIR    2025130    131400   -9.4500 -136.6300      26.6        75       125        60
OIR    2025130    131400   -9.4500 -136.6400      26.6        75       124        60
OIR    2025130    131400   -9.4500 -136.6500      26.6        75       123        60
OIR    2025130    131400   -9.4500 -136.6600      26.6        75       121        60
OIR    2025130    131400   -9.4500 -136.6700      26.5        75       120        60
OIR    2025130    131400   -9.4500 -136.6800      26.5        75       120        60
OIR    2025130    131400   -9.4500 -136.6900      26.5        74       120        60
OIR    2025130    131400   -9.4500 -136.7000      26.4        74       120        60
OIR    2025130    131400   -9.4500 -136.7100      26.4        74       119        60
OIR    2025130    131400   -9.4500 -136.7200      26.3        74       116        60
OIR    2025130    131400   -9.4500 -136.7300      26.3        74       116        60
OIR    2025130    131400   -9.4500 -136.7400      26.2        74       116        60
OIR    2025130    131400   -9.4500 -136.7500      26.2        74       112        60
OIR    2025130    131400   -9.4500 -136.7600      26.1        74       108        60
OIR    2025130    131400   -9.4500 -136.7700      26.1        74       108        60
OIR    2025130    131400   -9.4500 -136.7800      26.1        74       109        60
OIR    2025130    131400   -9.4500 -136.7900      26.1        73       111        60
OIR    2025130    131400   -9.4500 -136.8000      26.1        73       111        60
OIR    2025130    131400   -9.4500 -136.8100      26.1        73       111        60
OIR    2025130    131400   -9.4500 -136.8200      26.1        73       111        60
OIR    2025130    131400   -9.4500 -136.8300      26.1        73       113        60
OIR    2025130    131400   -9.4500 -136.8400      26.3        72       113        60
OIR    2025130    131400   -9.4500 -136.8500      26.7        70       112        60
OIR    2025130    131400   -9.4500 -136.8600      27.5        68       111        60
OIR    2025130    131400   -9.4500 -136.8700      27.8        67       111        60
OIR    2025130    131400   -9.4500 -136.8800      27.8        65       110        60
OIR    2025130    131400   -9.4500 -136.8900      27.8        65       110        60
OIR    2025130    131400   -9.4500 -136.9000      27.9        65       109        60
OIR    2025130    131400   -9.4500 -136.9100      27.9        65       109        60
OIR    2025130    131400   -9.4500 -136.9200      28.0        64       109        60
OIR    2025130    131400   -9.4500 -136.9300      28.1        64       109        60
OIR    2025130    131400   -9.4500 -136.9400      28.2        64       110        60
OIR    2025130    131400   -9.4500 -136.9500      28.4        64       110        60
OIR    2025130    131400   -9.4500 -136.9600      28.4        64       109        60
OIR    2025130    131400   -9.4500 -136.9700      28.5        64       110        60
OIR    2025130    131400   -9.4500 -136.9800      28.6        64       111        60
OIR    2025130    131400   -9.4500 -136.9900      28.6        64       111        60
OIR    2025130    131400   -9.4500 -137.0000      28.6        64       110        60
OIR    2025130    131400   -9.4500 -137.0100      28.6        65       109        60
OIR    2025130    131400   -9.4500 -137.0200      28.6        65       109        60
OIR    2025130    131400   -9.4500 -137.0300      28.6        65       111        60
OIR    2025130    131400   -9.4500 -137.0400      28.6        65       112        60
OIR    2025130    131400   -9.4500 -137.0500      28.7        65       114        60
OIR    2025130    131400   -9.4500 -137.0600      28.7        65       113        60
OIR    2025130    131400   -9.4500 -137.0700      28.7        65       111        60
OIR    2025130    131400   -9.4500 -137.0800      28.7        65       109        60
OIR    2025130    131400   -9.4500 -137.0900      28.7        65       109        60
OIR    2025130    131400   -9.4500 -137.1000      28.7        65       110        60
OIR    2025130    131400   -9.4500 -137.1100      28.7        65       111        60
OIR    2025130    131400   -9.4500 -137.1200      28.7        65       111        60
OIR    2025130    131400   -9.4500 -137.1300      28.8        65       110        60
OIR    2025130    131400   -9.4500 -137.1400      28.8        65       110        60
OIR    2025130    131400   -9.4500 -137.1500      28.8        64       110        60
OIR    2025130    131400   -9.4500 -137.1600      28.8        64       111        60
OIR    2025130    131400   -9.4500 -137.1700      28.7        64       111        60
OIR    2025130    131400   -9.4500 -137.1800      28.7        64       110        60
OIR    2025130    131400   -9.4500 -137.1900      28.6        64       110        60
OIR    2025130    131400   -9.4500 -137.2000      28.5        64       111        60
OIR    2025130    131400   -9.4500 -137.2100      28.3        63       110        60
OIR    2025130    131400   -9.4500 -137.2200      28.1        63       109        60
OIR    2025130    131400   -9.4500 -137.2300      28.0        63       107        60
OIR    2025130    131400   -9.4500 -137.2400      28.0        63       104        60
OIR    2025130    131400   -9.4500 -137.2500      27.9        63       104        60
OIR    2025130    131400   -9.4500 -137.2600      27.9        63       103        60
OIR    2025130    131400   -9.4500 -137.2700      27.9        63       103        60
OIR    2025130    131400   -9.4500 -137.2800      27.8        63       103        60
OIR    2025130    131400   -9.4500 -137.2900      27.8        63       103        60
OIR    2025130    131400   -9.4500 -137.3000      27.7        63       103        60
OIR    2025130    131400   -9.4500 -137.3100      27.7        63       103        60
OIR    2025130    131400   -9.4500 -137.3200      27.6        63       103        60
OIR    2025130    131400   -9.4500 -137.3300      27.5        63       103        60
OIR    2025130    131400   -9.4500 -137.3400      27.4        63       103        60
OIR    2025130    131400   -9.4500 -137.3500      26.9        64       103        60
OIR    2025130    131400   -9.4500 -137.3600      26.1        64       103        60
OIR    2025130    131400   -9.4500 -137.3700      25.2        65       103        60
OIR    2025130    131400   -9.4500 -137.3800      24.4        66       103        60
OIR    2025130    131400   -9.4500 -137.3900      23.1        67       103        60
OIR    2025130    131400   -9.4500 -137.4000      22.1        67       103        60
OIR    2025130    131400   -9.4500 -137.4100      21.2        67       103        60
OIR    2025130    131400   -9.4500 -137.4200      20.5        67       103        60
OIR    2025130    131400   -9.4500 -137.4300      19.4        67       103        60
OIR    2025130    131400   -9.4500 -137.4400      18.2        68       103        60
OIR    2025130    131400   -9.4500 -137.4500      16.6        70       103        60
OIR    2025130    131400   -9.4500 -137.4600      14.4        72       103        60
OIR    2025130    131400   -9.4500 -137.4700      12.1        75       103        60
OIR    2025130    131400   -9.4500 -137.4800      10.3        77       103        60
OIR    2025130    131400   -9.4500 -137.4900       8.7        79       103        60
OIR    2025130    131400   -9.4500 -137.5000       7.4        80       103        60
OIR    2025130    131400   -9.4500 -137.5100       6.1        81       103        60
OIR    2025130    131400   -9.4500 -137.5200       5.1        81       103        60
OIR    2025130    131400   -9.4500 -137.5300       4.2        81       103        60
OIR    2025130    131400   -9.4500 -137.6600       4.3       340       103        60
OIR    2025130    131400   -9.4500 -137.6700       5.5       344       103        60
OIR    2025130    131400   -9.4500 -137.6800       6.0       346       104        60
OIR    2025130    131400   -9.4500 -137.6900       5.8       341       104        60
OIR    2025130    131400   -9.4500 -137.7000       5.6       333       105        60
OIR    2025130    131400   -9.4500 -137.7100       5.5       323       107        60
OIR    2025130    131400   -9.4500 -137.7200       5.4       313       104        60
OIR    2025130    131400   -9.4500 -137.7300       5.4       305       103        60
OIR    2025130    131400   -9.4500 -137.7400       5.5       298       103        60
OIR    2025130    131400   -9.4500 -137.7500       5.7       293       103        60
OIR    2025130    131400   -9.4500 -137.7600       5.7       292       104        60
OIR    2025130    131400   -9.4500 -137.7700       5.8       291       105        60
OIR    2025130    131400   -9.4500 -137.7800       5.9       292       104        60
OIR    2025130    131400   -9.4500 -137.7900       6.0       292       103        60
OIR    2025130    131400   -9.4500 -137.8000       6.2       293       103        60
OIR    2025130    131400   -9.4500 -137.8100       7.4       290       103        60
OIR    2025130    131400   -9.4500 -137.8200       8.3       288       103        60
OIR    2025130    131400   -9.4500 -137.8300       8.8       286       103        60
OIR    2025130    131400   -9.4500 -137.8400       9.2       283       103        60
OIR    2025130    131400   -9.4500 -137.8500       9.5       283       103        60
OIR    2025130    131400   -9.4500 -137.8600       9.9       290       103        60
OIR    2025130    131400   -9.4500 -137.8700      11.0       297       105        60
OIR    2025130    131400   -9.4500 -137.8800      12.3       303       108        60
OIR    2025130    131400   -9.4500 -137.8900      13.1       305       109        60
OIR    2025130    131400   -9.4500 -137.9000      13.2       301       110        60
OIR    2025130    131400   -9.4500 -137.9100      13.6       300       111        60
OIR    2025130    131400   -9.4500 -137.9200      14.3       301       110        60
OIR    2025130    131400   -9.4500 -137.9300      15.4       303       108        60
OIR    2025130    131400   -9.4500 -137.9400      16.6       306       108        60
OIR    2025130    131400   -9.4500 -137.9500      17.5       308       109        60
OIR    2025130    131400   -9.4500 -137.9600      18.1       310       112        60
OIR    2025130    131400   -9.4500 -137.9700      18.4       312       115        60
OIR    2025130    131400   -9.4500 -137.9800      18.6       313       116        60
OIR    2025130    131400   -9.4500 -137.9900      18.6       314       116        60
OIR    2025130    131400   -9.4500 -138.0000      18.6       315       116        60
OIR    2025130    131400   -9.4500 -138.0100      18.6       316       116        60
OIR    2025130    131400   -9.4500 -138.0200      18.7       316       117        60
OIR    2025130    131400   -9.4500 -138.0300      18.8       317       117        60
OIR    2025130    131400   -9.4500 -138.0400      18.9       317       117        60
OIR    2025130    131400   -9.4500 -138.0500      19.0       317       117        60
OIR    2025130    131400   -9.4500 -138.0600      19.1       318       117        60
OIR    2025130    131400   -9.4500 -138.0700      19.2       318       121        60
OIR    2025130    131400   -9.4500 -138.0800      19.2       319       123        60
OIR    2025130    131400   -9.4500 -138.0900      19.2       319       123        60
OIR    2025130    131400   -9.4500 -138.1000      19.4       319       125        60
OIR    2025130    131400   -9.4500 -138.1100      19.6       319       128        60
OIR    2025130    131400   -9.4500 -138.1200      19.8       320       130        60
OIR    2025130    131400   -9.4500 -138.1300      19.9       320       131        60
OIR    2025130    131400   -9.4500 -138.1400      20.0       320       133        60
OIR    2025130    131400   -9.4500 -138.1500      20.3       321       136        60
OIR    2025130    131400   -9.4500 -138.1600      20.5       321       136        60
OIR    2025130    131400   -9.4500 -138.1700      20.9       321       137        60
OIR    2025130    131400   -9.4500 -138.1800      21.3       321       142        60
OIR    2025130    131400   -9.4500 -138.1900      21.7       321       146        60
OIR    2025130    131400   -9.4500 -138.2000      22.0       321       146        60
OIR    2025130    131400   -9.4500 -138.2100      22.5       321       148        60
OIR    2025130    131400   -9.4500 -138.2500      22.5       322       148        60
OIR    2025130    131400   -9.4500 -138.2600      22.1       323       146        60
OIR    2025130    131400   -9.4500 -138.2700      21.6       323       145        60
OIR    2025130    131400   -9.4500 -138.2800      20.9       324       145        60
OIR    2025130    131400   -9.4500 -138.2900      20.0       324       146        60
OIR    2025130    131400   -9.4500 -138.3000      19.7       325       148        60
OIR    2025130    131400   -9.4500 -138.3100      19.8       324       143        60
OIR    2025130    131400   -9.4500 -138.3200      20.0       325       142        60
OIR    2025130    131400   -9.4500 -138.3300      20.4       325       147        60
OIR    2025130    131400   -9.4500 -138.3400      20.8       326       146        60
OIR    2025130    131400   -9.4500 -138.3500      21.3       326       142        60
OIR    2025130    131400   -9.4500 -138.3600      21.8       327       136        60
OIR    2025130    131400   -9.4500 -138.3700      22.1       327       127        60
OIR    2025130    131400   -9.4500 -138.3800      22.4       328       121        60
OIR    2025130    131400   -9.4500 -138.3900      22.7       329       116        60
OIR    2025130    131400   -9.4500 -138.4000      23.2       329       114        60
OIR    2025130    131400   -9.4500 -138.4100      23.7       331       113        60
OIR    2025130    131400   -9.4500 -138.4200      24.3       335       113        60
OIR    2025130    131400   -9.4500 -138.4300      25.1       339       113        60
OIR    2025130    131400   -9.4500 -138.4400      25.9       341       113        60
OIR    2025130    131400   -9.4500 -138.4500      26.4       342       113        60
OIR    2025130    131400   -9.4500 -138.4600      26.4       344       113        60
OIR    2025130    131400   -9.4500 -138.4700      26.7       345       116        60
OIR    2025130    131400   -9.4500 -138.4800      27.4       345       125        60
OIR    2025130    131400   -9.4500 -138.4900      28.3       345       122        60
OIR    2025130    131400   -9.4500 -138.5000      28.4       346       117        60
OIR    2025130    131400   -9.4500 -138.5100      27.6       345       116        60
OIR    2025130    131400   -9.4500 -138.5200      26.0       343       116        60
OIR    2025130    131400   -9.4500 -138.5300      24.7       342       119        60
OIR    2025130    131400   -9.4500 -138.5400      24.2       340       121        60
OIR    2025130    131400   -9.4500 -138.5500      23.8       339       122        60
OIR    2025130    131400   -9.4500 -138.5600      22.1       335       121        60
OIR    2025130    131400   -9.4500 -138.5700      21.5       334       120        60
OIR    2025130    131400   -9.4500 -138.5800      21.3       334       121        60
OIR    2025130    131400   -9.4500 -138.5900      21.3       333       122        60
OIR    2025130    131400   -9.4500 -138.6000      21.3       333       127        60
OIR    2025130    131400   -9.4500 -138.6100      21.4       333       131        60
OIR    2025130    131400   -9.4500 -138.6200      21.5       334       132        60
OIR    2025130    131400   -9.4500 -138.6300      21.7       335       132        60
OIR    2025130    131400   -9.4500 -138.6400      22.6       336       138        60
OIR    2025130    131400   -9.4500 -138.6500      23.2       337       142        60
OIR    2025130    131400   -9.4500 -138.6600      23.4       339       143        60
OIR    2025130    131400   -9.4500 -138.6700      23.9       341       144        60
OIR    2025130    131400   -9.4500 -138.6800      23.9       343       145        60
OIR    2025130    131400   -9.4500 -138.6900      23.0       345       148        60
OIR    2025130    131400   -9.4600 -136.0500      43.7        83       144        60
OIR    2025130    131400   -9.4600 -136.0600      43.7        83       142        60
OIR    2025130    131400   -9.4600 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.4600 -136.1800      39.3        76       147        60
OIR    2025130    131400   -9.4600 -136.1900      39.3        76       141        60
OIR    2025130    131400   -9.4600 -136.2000      39.3        76       140        60
OIR    2025130    131400   -9.4600 -136.2100      39.3        76       139        60
OIR    2025130    131400   -9.4600 -136.2200      39.3        76       138        60
OIR    2025130    131400   -9.4600 -136.2300      39.3        76       137        60
OIR    2025130    131400   -9.4600 -136.2400      39.3        76       136        60
OIR    2025130    131400   -9.4600 -136.2500      39.3        76       135        60
OIR    2025130    131400   -9.4600 -136.2600      39.3        76       135        60
OIR    2025130    131400   -9.4600 -136.2700      39.3        77       135        60
OIR    2025130    131400   -9.4600 -136.2800      39.3        77       136        60
OIR    2025130    131400   -9.4600 -136.2900      39.3        77       135        60
OIR    2025130    131400   -9.4600 -136.3000      39.4        77       134        60
OIR    2025130    131400   -9.4600 -136.3100      39.5        77       133        60
OIR    2025130    131400   -9.4600 -136.3200      39.7        78       133        60
OIR    2025130    131400   -9.4600 -136.3300      39.7        78       137        60
OIR    2025130    131400   -9.4600 -136.3400      39.7        78       141        60
OIR    2025130    131400   -9.4600 -136.3500      39.8        78       144        60
OIR    2025130    131400   -9.4600 -136.3600      39.9        78       145        60
OIR    2025130    131400   -9.4600 -136.3700      39.9        79       143        60
OIR    2025130    131400   -9.4600 -136.3800      40.0        79       143        60
OIR    2025130    131400   -9.4600 -136.3900      40.0        79       145        60
OIR    2025130    131400   -9.4600 -136.4000      40.1        79       146        60
OIR    2025130    131400   -9.4600 -136.4100      40.0        79       145        60
OIR    2025130    131400   -9.4600 -136.4200      40.0        79       142        60
OIR    2025130    131400   -9.4600 -136.4300      40.0        79       139        60
OIR    2025130    131400   -9.4600 -136.4400      40.0        79       136        60
OIR    2025130    131400   -9.4600 -136.4500      40.0        79       133        60
OIR    2025130    131400   -9.4600 -136.4600      39.9        79       130        60
OIR    2025130    131400   -9.4600 -136.4700      39.9        79       128        60
OIR    2025130    131400   -9.4600 -136.4800      39.9        79       128        60
OIR    2025130    131400   -9.4600 -136.4900      39.9        79       128        60
OIR    2025130    131400   -9.4600 -136.5000      39.9        79       130        60
OIR    2025130    131400   -9.4600 -136.5100      39.9        79       133        60
OIR    2025130    131400   -9.4600 -136.5200      39.9        79       137        60
OIR    2025130    131400   -9.4600 -136.5300      39.8        79       138        60
OIR    2025130    131400   -9.4600 -136.5400      38.9        79       139        60
OIR    2025130    131400   -9.4600 -136.5500      37.4        79       138        60
OIR    2025130    131400   -9.4600 -136.5600      31.2        77       136        60
OIR    2025130    131400   -9.4600 -136.5700      27.0        75       134        60
OIR    2025130    131400   -9.4600 -136.5800      26.8        75       133        60
OIR    2025130    131400   -9.4600 -136.5900      26.8        75       131        60
OIR    2025130    131400   -9.4600 -136.6000      26.7        75       129        60
OIR    2025130    131400   -9.4600 -136.6100      26.7        75       128        60
OIR    2025130    131400   -9.4600 -136.6200      26.7        75       126        60
OIR    2025130    131400   -9.4600 -136.6300      26.7        75       125        60
OIR    2025130    131400   -9.4600 -136.6400      26.6        75       124        60
OIR    2025130    131400   -9.4600 -136.6500      26.6        75       123        60
OIR    2025130    131400   -9.4600 -136.6600      26.6        75       122        60
OIR    2025130    131400   -9.4600 -136.6700      26.6        75       120        60
OIR    2025130    131400   -9.4600 -136.6800      26.5        75       121        60
OIR    2025130    131400   -9.4600 -136.6900      26.5        74       121        60
OIR    2025130    131400   -9.4600 -136.7000      26.5        74       121        60
OIR    2025130    131400   -9.4600 -136.7100      26.4        74       120        60
OIR    2025130    131400   -9.4600 -136.7200      26.3        74       117        60
OIR    2025130    131400   -9.4600 -136.7300      26.3        74       116        60
OIR    2025130    131400   -9.4600 -136.7400      26.2        74       116        60
OIR    2025130    131400   -9.4600 -136.7500      26.2        74       113        60
OIR    2025130    131400   -9.4600 -136.7600      26.2        74       109        60
OIR    2025130    131400   -9.4600 -136.7700      26.1        73       109        60
OIR    2025130    131400   -9.4600 -136.7800      26.1        73       110        60
OIR    2025130    131400   -9.4600 -136.7900      26.1        73       111        60
OIR    2025130    131400   -9.4600 -136.8000      26.1        73       112        60
OIR    2025130    131400   -9.4600 -136.8100      26.1        73       111        60
OIR    2025130    131400   -9.4600 -136.8200      26.2        73       111        60
OIR    2025130    131400   -9.4600 -136.8300      26.3        73       114        60
OIR    2025130    131400   -9.4600 -136.8400      26.6        71       114        60
OIR    2025130    131400   -9.4600 -136.8500      27.1        69       111        60
OIR    2025130    131400   -9.4600 -136.8600      27.6        67       111        60
OIR    2025130    131400   -9.4600 -136.8700      27.8        66       110        60
OIR    2025130    131400   -9.4600 -136.8800      27.9        65       109        60
OIR    2025130    131400   -9.4600 -136.8900      27.9        65       108        60
OIR    2025130    131400   -9.4600 -136.9000      27.9        64       109        60
OIR    2025130    131400   -9.4600 -136.9100      28.0        64       109        60
OIR    2025130    131400   -9.4600 -136.9200      28.0        64       109        60
OIR    2025130    131400   -9.4600 -136.9300      28.1        64       109        60
OIR    2025130    131400   -9.4600 -136.9400      28.2        64       109        60
OIR    2025130    131400   -9.4600 -136.9500      28.4        64       108        60
OIR    2025130    131400   -9.4600 -136.9600      28.4        64       108        60
OIR    2025130    131400   -9.4600 -136.9700      28.5        64       109        60
OIR    2025130    131400   -9.4600 -136.9800      28.5        64       111        60
OIR    2025130    131400   -9.4600 -136.9900      28.5        64       110        60
OIR    2025130    131400   -9.4600 -137.0000      28.6        64       108        60
OIR    2025130    131400   -9.4600 -137.0100      28.6        64       108        60
OIR    2025130    131400   -9.4600 -137.0200      28.6        65       109        60
OIR    2025130    131400   -9.4600 -137.0300      28.6        65       110        60
OIR    2025130    131400   -9.4600 -137.0400      28.6        65       111        60
OIR    2025130    131400   -9.4600 -137.0500      28.6        65       113        60
OIR    2025130    131400   -9.4600 -137.0600      28.7        65       112        60
OIR    2025130    131400   -9.4600 -137.0700      28.7        65       111        60
OIR    2025130    131400   -9.4600 -137.0800      28.7        65       110        60
OIR    2025130    131400   -9.4600 -137.0900      28.7        65       111        60
OIR    2025130    131400   -9.4600 -137.1000      28.7        65       111        60
OIR    2025130    131400   -9.4600 -137.1100      28.7        65       111        60
OIR    2025130    131400   -9.4600 -137.1200      28.7        65       111        60
OIR    2025130    131400   -9.4600 -137.1300      28.8        65       111        60
OIR    2025130    131400   -9.4600 -137.1400      28.8        64       111        60
OIR    2025130    131400   -9.4600 -137.1500      28.8        64       111        60
OIR    2025130    131400   -9.4600 -137.1600      28.8        64       111        60
OIR    2025130    131400   -9.4600 -137.1700      28.8        64       111        60
OIR    2025130    131400   -9.4600 -137.1800      28.7        64       110        60
OIR    2025130    131400   -9.4600 -137.1900      28.7        64       109        60
OIR    2025130    131400   -9.4600 -137.2000      28.5        64       109        60
OIR    2025130    131400   -9.4600 -137.2100      28.3        63       109        60
OIR    2025130    131400   -9.4600 -137.2200      28.1        63       109        60
OIR    2025130    131400   -9.4600 -137.2300      28.0        63       107        60
OIR    2025130    131400   -9.4600 -137.2400      28.0        63       105        60
OIR    2025130    131400   -9.4600 -137.2500      27.9        63       104        60
OIR    2025130    131400   -9.4600 -137.2600      27.9        63       103        60
OIR    2025130    131400   -9.4600 -137.2700      27.9        63       103        60
OIR    2025130    131400   -9.4600 -137.2800      27.9        63       103        60
OIR    2025130    131400   -9.4600 -137.2900      27.8        63       103        60
OIR    2025130    131400   -9.4600 -137.3000      27.8        63       103        60
OIR    2025130    131400   -9.4600 -137.3100      27.7        63       103        60
OIR    2025130    131400   -9.4600 -137.3200      27.7        63       103        60
OIR    2025130    131400   -9.4600 -137.3300      27.6        63       103        60
OIR    2025130    131400   -9.4600 -137.3400      27.4        63       103        60
OIR    2025130    131400   -9.4600 -137.3500      27.1        64       103        60
OIR    2025130    131400   -9.4600 -137.3600      26.2        65       103        60
OIR    2025130    131400   -9.4600 -137.3700      25.4        65       103        60
OIR    2025130    131400   -9.4600 -137.3800      24.5        66       103        60
OIR    2025130    131400   -9.4600 -137.3900      23.4        67       103        60
OIR    2025130    131400   -9.4600 -137.4000      22.4        67       103        60
OIR    2025130    131400   -9.4600 -137.4100      21.5        66       103        60
OIR    2025130    131400   -9.4600 -137.4200      21.0        65       103        60
OIR    2025130    131400   -9.4600 -137.4300      20.5        65       103        60
OIR    2025130    131400   -9.4600 -137.4400      19.7        65       103        60
OIR    2025130    131400   -9.4600 -137.4500      18.3        66       103        60
OIR    2025130    131400   -9.4600 -137.4600      16.3        69       103        60
OIR    2025130    131400   -9.4600 -137.4700      13.9        72       103        60
OIR    2025130    131400   -9.4600 -137.4800      11.9        75       103        60
OIR    2025130    131400   -9.4600 -137.4900      10.2        77       103        60
OIR    2025130    131400   -9.4600 -137.5000       8.6        79       103        60
OIR    2025130    131400   -9.4600 -137.5100       7.2        81       103        60
OIR    2025130    131400   -9.4600 -137.5200       6.0        82       103        60
OIR    2025130    131400   -9.4600 -137.5300       5.1        83       103        60
OIR    2025130    131400   -9.4600 -137.5400       4.4        84       103        60
OIR    2025130    131400   -9.4600 -137.6500       4.9       353       103        60
OIR    2025130    131400   -9.4600 -137.6600       6.2       352       103        60
OIR    2025130    131400   -9.4600 -137.6700       7.6       354       103        60
OIR    2025130    131400   -9.4600 -137.6800       8.1       356       104        60
OIR    2025130    131400   -9.4600 -137.6900       8.0       355       104        60
OIR    2025130    131400   -9.4600 -137.7000       7.8       351       105        60
OIR    2025130    131400   -9.4600 -137.7100       7.5       346       108        60
OIR    2025130    131400   -9.4600 -137.7200       6.8       338       105        60
OIR    2025130    131400   -9.4600 -137.7300       6.0       325       104        60
OIR    2025130    131400   -9.4600 -137.7400       5.6       310       104        60
OIR    2025130    131400   -9.4600 -137.7500       5.6       299       103        60
OIR    2025130    131400   -9.4600 -137.7600       5.7       294       104        60
OIR    2025130    131400   -9.4600 -137.7700       5.7       294       104        60
OIR    2025130    131400   -9.4600 -137.7800       5.9       293       103        60
OIR    2025130    131400   -9.4600 -137.7900       6.0       294       103        60
OIR    2025130    131400   -9.4600 -137.8000       6.3       297       103        60
OIR    2025130    131400   -9.4600 -137.8100       7.6       296       103        60
OIR    2025130    131400   -9.4600 -137.8200       8.3       295       103        60
OIR    2025130    131400   -9.4600 -137.8300       8.7       296       103        60
OIR    2025130    131400   -9.4600 -137.8400       9.5       299       103        60
OIR    2025130    131400   -9.4600 -137.8500      10.5       303       103        60
OIR    2025130    131400   -9.4600 -137.8600      12.1       306       103        60
OIR    2025130    131400   -9.4600 -137.8700      13.8       308       104        60
OIR    2025130    131400   -9.4600 -137.8800      14.8       310       107        60
OIR    2025130    131400   -9.4600 -137.8900      15.3       310       108        60
OIR    2025130    131400   -9.4600 -137.9000      15.8       310       108        60
OIR    2025130    131400   -9.4600 -137.9100      15.9       309       108        60
OIR    2025130    131400   -9.4600 -137.9200      16.0       308       109        60
OIR    2025130    131400   -9.4600 -137.9300      16.5       308       109        60
OIR    2025130    131400   -9.4600 -137.9400      17.3       310       108        60
OIR    2025130    131400   -9.4600 -137.9500      18.2       311       108        60
OIR    2025130    131400   -9.4600 -137.9600      18.6       312       110        60
OIR    2025130    131400   -9.4600 -137.9700      18.8       313       112        60
OIR    2025130    131400   -9.4600 -137.9800      18.9       314       114        60
OIR    2025130    131400   -9.4600 -137.9900      18.9       315       116        60
OIR    2025130    131400   -9.4600 -138.0000      19.0       315       116        60
OIR    2025130    131400   -9.4600 -138.0100      19.0       316       116        60
OIR    2025130    131400   -9.4600 -138.0200      19.1       317       117        60
OIR    2025130    131400   -9.4600 -138.0300      19.2       317       119        60
OIR    2025130    131400   -9.4600 -138.0400      19.3       317       117        60
OIR    2025130    131400   -9.4600 -138.0500      19.4       317       117        60
OIR    2025130    131400   -9.4600 -138.0600      19.5       318       117        60
OIR    2025130    131400   -9.4600 -138.0700      19.7       318       121        60
OIR    2025130    131400   -9.4600 -138.0800      19.8       318       123        60
OIR    2025130    131400   -9.4600 -138.0900      19.9       318       123        60
OIR    2025130    131400   -9.4600 -138.1000      20.0       318       124        60
OIR    2025130    131400   -9.4600 -138.1100      20.1       319       126        60
OIR    2025130    131400   -9.4600 -138.1200      20.2       319       127        60
OIR    2025130    131400   -9.4600 -138.1300      20.3       319       129        60
OIR    2025130    131400   -9.4600 -138.1400      20.7       320       131        60
OIR    2025130    131400   -9.4600 -138.1500      21.0       320       134        60
OIR    2025130    131400   -9.4600 -138.1600      21.3       320       135        60
OIR    2025130    131400   -9.4600 -138.1700      21.5       320       137        60
OIR    2025130    131400   -9.4600 -138.1800      21.8       320       140        60
OIR    2025130    131400   -9.4600 -138.1900      22.0       320       144        60
OIR    2025130    131400   -9.4600 -138.2000      22.3       320       145        60
OIR    2025130    131400   -9.4600 -138.2100      22.6       320       147        60
OIR    2025130    131400   -9.4600 -138.2500      22.7       321       147        60
OIR    2025130    131400   -9.4600 -138.2600      22.4       321       144        60
OIR    2025130    131400   -9.4600 -138.2700      22.0       322       143        60
OIR    2025130    131400   -9.4600 -138.2800      21.2       322       143        60
OIR    2025130    131400   -9.4600 -138.2900      20.6       323       146        60
OIR    2025130    131400   -9.4600 -138.3000      20.2       324       149        60
OIR    2025130    131400   -9.4600 -138.3100      20.2       324       146        60
OIR    2025130    131400   -9.4600 -138.3200      20.3       324       143        60
OIR    2025130    131400   -9.4600 -138.3300      20.6       325       141        60
OIR    2025130    131400   -9.4600 -138.3400      20.9       325       140        60
OIR    2025130    131400   -9.4600 -138.3500      21.4       326       141        60
OIR    2025130    131400   -9.4600 -138.3600      21.8       326       136        60
OIR    2025130    131400   -9.4600 -138.3700      21.9       327       127        60
OIR    2025130    131400   -9.4600 -138.3800      22.1       327       123        60
OIR    2025130    131400   -9.4600 -138.3900      22.3       327       120        60
OIR    2025130    131400   -9.4600 -138.4000      22.5       327       116        60
OIR    2025130    131400   -9.4600 -138.4100      22.8       328       114        60
OIR    2025130    131400   -9.4600 -138.4200      23.2       331       113        60
OIR    2025130    131400   -9.4600 -138.4300      24.0       334       113        60
OIR    2025130    131400   -9.4600 -138.4400      24.9       337       114        60
OIR    2025130    131400   -9.4600 -138.4500      25.6       339       114        60
OIR    2025130    131400   -9.4600 -138.4600      26.0       341       115        60
OIR    2025130    131400   -9.4600 -138.4700      26.3       342       117        60
OIR    2025130    131400   -9.4600 -138.4800      26.6       342       125        60
OIR    2025130    131400   -9.4600 -138.4900      26.7       341       123        60
OIR    2025130    131400   -9.4600 -138.5000      26.3       342       120        60
OIR    2025130    131400   -9.4600 -138.5100      26.0       341       120        60
OIR    2025130    131400   -9.4600 -138.5200      25.3       341       120        60
OIR    2025130    131400   -9.4600 -138.5300      24.5       340       123        60
OIR    2025130    131400   -9.4600 -138.5400      24.1       339       125        60
OIR    2025130    131400   -9.4600 -138.5500      23.7       337       126        60
OIR    2025130    131400   -9.4600 -138.5600      22.6       335       125        60
OIR    2025130    131400   -9.4600 -138.5700      21.8       334       123        60
OIR    2025130    131400   -9.4600 -138.5800      21.4       334       124        60
OIR    2025130    131400   -9.4600 -138.5900      21.3       333       128        60
OIR    2025130    131400   -9.4600 -138.6000      21.4       333       133        60
OIR    2025130    131400   -9.4600 -138.6100      21.5       334       136        60
OIR    2025130    131400   -9.4600 -138.6200      21.5       334       137        60
OIR    2025130    131400   -9.4600 -138.6300      21.6       334       137        60
OIR    2025130    131400   -9.4600 -138.6400      21.7       336       140        60
OIR    2025130    131400   -9.4600 -138.6500      21.8       337       142        60
OIR    2025130    131400   -9.4600 -138.6600      21.7       339       146        60
OIR    2025130    131400   -9.4600 -138.6700      21.8       341       148        60
OIR    2025130    131400   -9.4700 -135.9900      43.6        83       145        60
OIR    2025130    131400   -9.4700 -136.0400      43.7        83       145        60
OIR    2025130    131400   -9.4700 -136.0500      43.7        83       143        60
OIR    2025130    131400   -9.4700 -136.0600      43.7        83       142        60
OIR    2025130    131400   -9.4700 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.4700 -136.1900      39.2        76       140        60
OIR    2025130    131400   -9.4700 -136.2000      39.2        76       138        60
OIR    2025130    131400   -9.4700 -136.2100      39.2        76       137        60
OIR    2025130    131400   -9.4700 -136.2200      39.2        76       136        60
OIR    2025130    131400   -9.4700 -136.2300      39.3        76       135        60
OIR    2025130    131400   -9.4700 -136.2400      39.3        76       134        60
OIR    2025130    131400   -9.4700 -136.2500      39.2        77       134        60
OIR    2025130    131400   -9.4700 -136.2600      39.2        77       134        60
OIR    2025130    131400   -9.4700 -136.2700      39.2        77       134        60
OIR    2025130    131400   -9.4700 -136.2800      39.2        77       134        60
OIR    2025130    131400   -9.4700 -136.2900      39.3        77       134        60
OIR    2025130    131400   -9.4700 -136.3000      39.3        77       133        60
OIR    2025130    131400   -9.4700 -136.3100      39.5        77       133        60
OIR    2025130    131400   -9.4700 -136.3200      39.6        77       132        60
OIR    2025130    131400   -9.4700 -136.3300      39.6        78       135        60
OIR    2025130    131400   -9.4700 -136.3400      39.6        78       140        60
OIR    2025130    131400   -9.4700 -136.3500      39.6        78       143        60
OIR    2025130    131400   -9.4700 -136.3600      39.7        78       144        60
OIR    2025130    131400   -9.4700 -136.3700      39.7        78       142        60
OIR    2025130    131400   -9.4700 -136.3800      39.8        79       141        60
OIR    2025130    131400   -9.4700 -136.3900      39.9        79       143        60
OIR    2025130    131400   -9.4700 -136.4000      40.0        79       144        60
OIR    2025130    131400   -9.4700 -136.4100      40.0        79       145        60
OIR    2025130    131400   -9.4700 -136.4200      40.0        80       143        60
OIR    2025130    131400   -9.4700 -136.4300      39.9        80       140        60
OIR    2025130    131400   -9.4700 -136.4400      39.9        80       137        60
OIR    2025130    131400   -9.4700 -136.4500      39.9        80       133        60
OIR    2025130    131400   -9.4700 -136.4600      39.9        79       130        60
OIR    2025130    131400   -9.4700 -136.4700      39.9        79       128        60
OIR    2025130    131400   -9.4700 -136.4800      39.9        79       127        60
OIR    2025130    131400   -9.4700 -136.4900      39.9        79       126        60
OIR    2025130    131400   -9.4700 -136.5000      39.9        79       128        60
OIR    2025130    131400   -9.4700 -136.5100      39.9        79       133        60
OIR    2025130    131400   -9.4700 -136.5200      39.8        79       139        60
OIR    2025130    131400   -9.4700 -136.5300      39.8        79       138        60
OIR    2025130    131400   -9.4700 -136.5400      39.4        79       137        60
OIR    2025130    131400   -9.4700 -136.5500      37.8        79       137        60
OIR    2025130    131400   -9.4700 -136.5600      32.7        77       136        60
OIR    2025130    131400   -9.4700 -136.5700      27.0        75       135        60
OIR    2025130    131400   -9.4700 -136.5800      26.9        75       133        60
OIR    2025130    131400   -9.4700 -136.5900      26.8        75       132        60
OIR    2025130    131400   -9.4700 -136.6000      26.8        75       130        60
OIR    2025130    131400   -9.4700 -136.6100      26.8        75       129        60
OIR    2025130    131400   -9.4700 -136.6200      26.7        75       127        60
OIR    2025130    131400   -9.4700 -136.6300      26.7        75       125        60
OIR    2025130    131400   -9.4700 -136.6400      26.7        75       124        60
OIR    2025130    131400   -9.4700 -136.6500      26.7        75       123        60
OIR    2025130    131400   -9.4700 -136.6600      26.6        75       122        60
OIR    2025130    131400   -9.4700 -136.6700      26.6        75       122        60
OIR    2025130    131400   -9.4700 -136.6800      26.6        75       122        60
OIR    2025130    131400   -9.4700 -136.6900      26.6        74       122        60
OIR    2025130    131400   -9.4700 -136.7000      26.5        74       122        60
OIR    2025130    131400   -9.4700 -136.7100      26.5        74       121        60
OIR    2025130    131400   -9.4700 -136.7200      26.4        74       119        60
OIR    2025130    131400   -9.4700 -136.7300      26.3        74       117        60
OIR    2025130    131400   -9.4700 -136.7400      26.3        74       116        60
OIR    2025130    131400   -9.4700 -136.7500      26.2        74       114        60
OIR    2025130    131400   -9.4700 -136.7600      26.2        73       111        60
OIR    2025130    131400   -9.4700 -136.7700      26.1        73       111        60
OIR    2025130    131400   -9.4700 -136.7800      26.1        73       111        60
OIR    2025130    131400   -9.4700 -136.7900      26.1        73       112        60
OIR    2025130    131400   -9.4700 -136.8000      26.1        73       112        60
OIR    2025130    131400   -9.4700 -136.8100      26.1        73       110        60
OIR    2025130    131400   -9.4700 -136.8200      26.2        73       111        60
OIR    2025130    131400   -9.4700 -136.8300      26.4        72       115        60
OIR    2025130    131400   -9.4700 -136.8400      26.9        69       114        60
OIR    2025130    131400   -9.4700 -136.8500      27.4        67       111        60
OIR    2025130    131400   -9.4700 -136.8600      27.6        66       110        60
OIR    2025130    131400   -9.4700 -136.8700      27.8        65       109        60
OIR    2025130    131400   -9.4700 -136.8800      27.9        65       108        60
OIR    2025130    131400   -9.4700 -136.8900      27.9        64       108        60
OIR    2025130    131400   -9.4700 -136.9000      27.9        64       109        60
OIR    2025130    131400   -9.4700 -136.9100      28.0        64       109        60
OIR    2025130    131400   -9.4700 -136.9200      28.0        64       109        60
OIR    2025130    131400   -9.4700 -136.9300      28.1        64       108        60
OIR    2025130    131400   -9.4700 -136.9400      28.2        64       108        60
OIR    2025130    131400   -9.4700 -136.9500      28.3        64       107        60
OIR    2025130    131400   -9.4700 -136.9600      28.4        64       107        60
OIR    2025130    131400   -9.4700 -136.9700      28.4        64       108        60
OIR    2025130    131400   -9.4700 -136.9800      28.5        64       110        60
OIR    2025130    131400   -9.4700 -136.9900      28.5        64       109        60
OIR    2025130    131400   -9.4700 -137.0000      28.5        64       107        60
OIR    2025130    131400   -9.4700 -137.0100      28.6        64       108        60
OIR    2025130    131400   -9.4700 -137.0200      28.6        64       108        60
OIR    2025130    131400   -9.4700 -137.0300      28.6        65       109        60
OIR    2025130    131400   -9.4700 -137.0400      28.6        65       110        60
OIR    2025130    131400   -9.4700 -137.0500      28.6        65       111        60
OIR    2025130    131400   -9.4700 -137.0600      28.7        65       111        60
OIR    2025130    131400   -9.4700 -137.0700      28.7        65       110        60
OIR    2025130    131400   -9.4700 -137.0800      28.7        65       111        60
OIR    2025130    131400   -9.4700 -137.0900      28.7        65       112        60
OIR    2025130    131400   -9.4700 -137.1000      28.7        65       112        60
OIR    2025130    131400   -9.4700 -137.1100      28.7        65       111        60
OIR    2025130    131400   -9.4700 -137.1200      28.8        65       112        60
OIR    2025130    131400   -9.4700 -137.1300      28.9        64       112        60
OIR    2025130    131400   -9.4700 -137.1400      28.9        64       112        60
OIR    2025130    131400   -9.4700 -137.1500      28.9        64       112        60
OIR    2025130    131400   -9.4700 -137.1600      28.9        64       111        60
OIR    2025130    131400   -9.4700 -137.1700      28.8        64       111        60
OIR    2025130    131400   -9.4700 -137.1800      28.8        64       110        60
OIR    2025130    131400   -9.4700 -137.1900      28.7        64       109        60
OIR    2025130    131400   -9.4700 -137.2000      28.6        63       107        60
OIR    2025130    131400   -9.4700 -137.2100      28.4        63       108        60
OIR    2025130    131400   -9.4700 -137.2200      28.2        63       109        60
OIR    2025130    131400   -9.4700 -137.2300      28.1        63       107        60
OIR    2025130    131400   -9.4700 -137.2400      28.0        63       105        60
OIR    2025130    131400   -9.4700 -137.2500      28.0        63       104        60
OIR    2025130    131400   -9.4700 -137.2600      27.9        63       103        60
OIR    2025130    131400   -9.4700 -137.2700      27.9        63       103        60
OIR    2025130    131400   -9.4700 -137.2800      27.9        63       103        60
OIR    2025130    131400   -9.4700 -137.2900      27.9        63       103        60
OIR    2025130    131400   -9.4700 -137.3000      27.9        63       103        60
OIR    2025130    131400   -9.4700 -137.3100      27.8        63       103        60
OIR    2025130    131400   -9.4700 -137.3200      27.8        63       103        60
OIR    2025130    131400   -9.4700 -137.3300      27.6        63       103        60
OIR    2025130    131400   -9.4700 -137.3400      27.5        63       103        60
OIR    2025130    131400   -9.4700 -137.3500      27.2        64       103        60
OIR    2025130    131400   -9.4700 -137.3600      26.3        64       103        60
OIR    2025130    131400   -9.4700 -137.3700      25.6        65       103        60
OIR    2025130    131400   -9.4700 -137.3800      24.7        66       103        60
OIR    2025130    131400   -9.4700 -137.3900      23.5        67       103        60
OIR    2025130    131400   -9.4700 -137.4000      22.6        67       103        60
OIR    2025130    131400   -9.4700 -137.4100      21.7        66       103        60
OIR    2025130    131400   -9.4700 -137.4200      21.3        65       103        60
OIR    2025130    131400   -9.4700 -137.4300      20.8        65       103        60
OIR    2025130    131400   -9.4700 -137.4400      20.3        65       103        60
OIR    2025130    131400   -9.4700 -137.4500      19.4        65       103        60
OIR    2025130    131400   -9.4700 -137.4600      18.0        67       103        60
OIR    2025130    131400   -9.4700 -137.4700      16.0        69       103        60
OIR    2025130    131400   -9.4700 -137.4800      14.2        72       103        60
OIR    2025130    131400   -9.4700 -137.4900      12.4        74       103        60
OIR    2025130    131400   -9.4700 -137.5000      10.3        77       103        60
OIR    2025130    131400   -9.4700 -137.5100       8.5        80       103        60
OIR    2025130    131400   -9.4700 -137.5200       6.9        82       103        60
OIR    2025130    131400   -9.4700 -137.5300       5.8        83       103        60
OIR    2025130    131400   -9.4700 -137.5400       5.0        83       103        60
OIR    2025130    131400   -9.4700 -137.5500       4.2        83       103        60
OIR    2025130    131400   -9.4700 -137.6300       4.3         4       103        60
OIR    2025130    131400   -9.4700 -137.6400       5.9         2       103        60
OIR    2025130    131400   -9.4700 -137.6500       7.8         1       103        60
OIR    2025130    131400   -9.4700 -137.6600       8.7       359       103        60
OIR    2025130    131400   -9.4700 -137.6700       8.9       358       103        60
OIR    2025130    131400   -9.4700 -137.6800       8.9       358       104        60
OIR    2025130    131400   -9.4700 -137.6900       8.9       358       104        60
OIR    2025130    131400   -9.4700 -137.7000       9.1       355       105        60
OIR    2025130    131400   -9.4700 -137.7100       9.3       352       108        60
OIR    2025130    131400   -9.4700 -137.7200       9.2       349       107        60
OIR    2025130    131400   -9.4700 -137.7300       8.9       345       104        60
OIR    2025130    131400   -9.4700 -137.7400       8.0       337       104        60
OIR    2025130    131400   -9.4700 -137.7500       6.9       323       103        60
OIR    2025130    131400   -9.4700 -137.7600       6.0       309       103        60
OIR    2025130    131400   -9.4700 -137.7700       5.8       301       103        60
OIR    2025130    131400   -9.4700 -137.7800       6.0       301       103        60
OIR    2025130    131400   -9.4700 -137.7900       6.3       306       103        60
OIR    2025130    131400   -9.4700 -137.8000       7.1       315       103        60
OIR    2025130    131400   -9.4700 -137.8100       9.0       317       103        60
OIR    2025130    131400   -9.4700 -137.8200      10.0       314       103        60
OIR    2025130    131400   -9.4700 -137.8300      10.5       313       103        60
OIR    2025130    131400   -9.4700 -137.8400      11.2       312       103        60
OIR    2025130    131400   -9.4700 -137.8500      12.5       313       103        60
OIR    2025130    131400   -9.4700 -137.8600      14.2       314       103        60
OIR    2025130    131400   -9.4700 -137.8700      15.4       313       104        60
OIR    2025130    131400   -9.4700 -137.8800      15.8       312       105        60
OIR    2025130    131400   -9.4700 -137.8900      16.1       311       105        60
OIR    2025130    131400   -9.4700 -137.9000      16.5       311       105        60
OIR    2025130    131400   -9.4700 -137.9100      16.8       311       105        60
OIR    2025130    131400   -9.4700 -137.9200      17.1       311       107        60
OIR    2025130    131400   -9.4700 -137.9300      17.4       312       108        60
OIR    2025130    131400   -9.4700 -137.9400      18.0       312       108        60
OIR    2025130    131400   -9.4700 -137.9500      18.7       313       108        60
OIR    2025130    131400   -9.4700 -137.9600      19.0       314       110        60
OIR    2025130    131400   -9.4700 -137.9700      19.0       314       111        60
OIR    2025130    131400   -9.4700 -137.9800      19.1       314       113        60
OIR    2025130    131400   -9.4700 -137.9900      19.1       315       115        60
OIR    2025130    131400   -9.4700 -138.0000      19.2       316       115        60
OIR    2025130    131400   -9.4700 -138.0100      19.3       316       116        60
OIR    2025130    131400   -9.4700 -138.0200      19.4       317       117        60
OIR    2025130    131400   -9.4700 -138.0300      19.4       317       119        60
OIR    2025130    131400   -9.4700 -138.0400      19.5       317       119        60
OIR    2025130    131400   -9.4700 -138.0500      19.7       317       117        60
OIR    2025130    131400   -9.4700 -138.0600      19.8       318       117        60
OIR    2025130    131400   -9.4700 -138.0700      20.0       318       120        60
OIR    2025130    131400   -9.4700 -138.0800      20.0       318       122        60
OIR    2025130    131400   -9.4700 -138.0900      20.1       318       122        60
OIR    2025130    131400   -9.4700 -138.1000      20.1       318       123        60
OIR    2025130    131400   -9.4700 -138.1100      20.2       318       124        60
OIR    2025130    131400   -9.4700 -138.1200      20.3       319       126        60
OIR    2025130    131400   -9.4700 -138.1300      20.7       319       127        60
OIR    2025130    131400   -9.4700 -138.1400      21.3       318       130        60
OIR    2025130    131400   -9.4700 -138.1500      21.6       318       133        60
OIR    2025130    131400   -9.4700 -138.1600      21.9       319       135        60
OIR    2025130    131400   -9.4700 -138.1700      22.0       319       138        60
OIR    2025130    131400   -9.4700 -138.1800      22.1       320       140        60
OIR    2025130    131400   -9.4700 -138.1900      22.3       320       142        60
OIR    2025130    131400   -9.4700 -138.2000      22.5       320       145        60
OIR    2025130    131400   -9.4700 -138.2100      23.0       320       148        60
OIR    2025130    131400   -9.4700 -138.2300      23.1       320       149        60
OIR    2025130    131400   -9.4700 -138.2400      23.0       320       147        60
OIR    2025130    131400   -9.4700 -138.2500      22.8       320       145        60
OIR    2025130    131400   -9.4700 -138.2600      22.5       321       143        60
OIR    2025130    131400   -9.4700 -138.2700      22.2       321       142        60
OIR    2025130    131400   -9.4700 -138.2800      21.6       321       142        60
OIR    2025130    131400   -9.4700 -138.2900      21.0       322       145        60
OIR    2025130    131400   -9.4700 -138.3000      20.6       323       149        60
OIR    2025130    131400   -9.4700 -138.3100      20.5       323       148        60
OIR    2025130    131400   -9.4700 -138.3200      20.6       324       145        60
OIR    2025130    131400   -9.4700 -138.3300      20.8       325       139        60
OIR    2025130    131400   -9.4700 -138.3400      21.2       326       138        60
OIR    2025130    131400   -9.4700 -138.3500      21.5       326       140        60
OIR    2025130    131400   -9.4700 -138.3600      21.8       326       136        60
OIR    2025130    131400   -9.4700 -138.3700      21.9       326       126        60
OIR    2025130    131400   -9.4700 -138.3800      22.0       326       123        60
OIR    2025130    131400   -9.4700 -138.3900      22.1       327       122        60
OIR    2025130    131400   -9.4700 -138.4000      22.2       327       119        60
OIR    2025130    131400   -9.4700 -138.4100      22.4       327       115        60
OIR    2025130    131400   -9.4700 -138.4200      22.8       328       114        60
OIR    2025130    131400   -9.4700 -138.4300      23.5       331       113        60
OIR    2025130    131400   -9.4700 -138.4400      24.3       334       114        60
OIR    2025130    131400   -9.4700 -138.4500      24.9       336       115        60
OIR    2025130    131400   -9.4700 -138.4600      25.6       339       116        60
OIR    2025130    131400   -9.4700 -138.4700      25.9       340       119        60
OIR    2025130    131400   -9.4700 -138.4800      26.0       340       124        60
OIR    2025130    131400   -9.4700 -138.4900      25.9       340       123        60
OIR    2025130    131400   -9.4700 -138.5000      25.8       340       121        60
OIR    2025130    131400   -9.4700 -138.5100      25.5       340       122        60
OIR    2025130    131400   -9.4700 -138.5200      25.0       340       122        60
OIR    2025130    131400   -9.4700 -138.5300      24.5       339       125        60
OIR    2025130    131400   -9.4700 -138.5400      24.1       338       127        60
OIR    2025130    131400   -9.4700 -138.5500      23.8       336       128        60
OIR    2025130    131400   -9.4700 -138.5600      23.4       335       127        60
OIR    2025130    131400   -9.4700 -138.5700      22.8       334       126        60
OIR    2025130    131400   -9.4700 -138.5800      22.3       334       128        60
OIR    2025130    131400   -9.4700 -138.5900      22.3       333       133        60
OIR    2025130    131400   -9.4700 -138.6000      22.2       333       137        60
OIR    2025130    131400   -9.4700 -138.6100      21.9       333       140        60
OIR    2025130    131400   -9.4700 -138.6200      21.8       334       141        60
OIR    2025130    131400   -9.4700 -138.6300      21.7       334       142        60
OIR    2025130    131400   -9.4700 -138.6400      21.4       336       143        60
OIR    2025130    131400   -9.4700 -138.6500      21.3       337       145        60
OIR    2025130    131400   -9.4700 -138.6600      21.1       339       148        60
OIR    2025130    131400   -9.4800 -135.9900      43.6        83       147        60
OIR    2025130    131400   -9.4800 -136.0400      43.7        83       146        60
OIR    2025130    131400   -9.4800 -136.0500      43.7        83       144        60
OIR    2025130    131400   -9.4800 -136.0600      43.7        83       144        60
OIR    2025130    131400   -9.4800 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.4800 -136.1900      39.2        76       141        60
OIR    2025130    131400   -9.4800 -136.2000      39.2        76       138        60
OIR    2025130    131400   -9.4800 -136.2100      39.2        76       137        60
OIR    2025130    131400   -9.4800 -136.2200      39.2        77       136        60
OIR    2025130    131400   -9.4800 -136.2300      39.2        77       136        60
OIR    2025130    131400   -9.4800 -136.2400      39.2        77       134        60
OIR    2025130    131400   -9.4800 -136.2500      39.2        77       134        60
OIR    2025130    131400   -9.4800 -136.2600      39.2        77       134        60
OIR    2025130    131400   -9.4800 -136.2700      39.2        77       135        60
OIR    2025130    131400   -9.4800 -136.2800      39.2        77       136        60
OIR    2025130    131400   -9.4800 -136.2900      39.2        77       136        60
OIR    2025130    131400   -9.4800 -136.3000      39.3        77       135        60
OIR    2025130    131400   -9.4800 -136.3100      39.4        77       134        60
OIR    2025130    131400   -9.4800 -136.3200      39.5        77       133        60
OIR    2025130    131400   -9.4800 -136.3300      39.5        78       137        60
OIR    2025130    131400   -9.4800 -136.3400      39.4        78       142        60
OIR    2025130    131400   -9.4800 -136.3500      39.3        78       143        60
OIR    2025130    131400   -9.4800 -136.3600      39.3        78       143        60
OIR    2025130    131400   -9.4800 -136.3700      39.4        78       141        60
OIR    2025130    131400   -9.4800 -136.3800      39.5        79       140        60
OIR    2025130    131400   -9.4800 -136.3900      39.6        79       140        60
OIR    2025130    131400   -9.4800 -136.4000      39.8        80       141        60
OIR    2025130    131400   -9.4800 -136.4100      39.7        80       143        60
OIR    2025130    131400   -9.4800 -136.4200      39.7        80       142        60
OIR    2025130    131400   -9.4800 -136.4300      39.8        80       140        60
OIR    2025130    131400   -9.4800 -136.4400      39.8        80       137        60
OIR    2025130    131400   -9.4800 -136.4500      39.8        80       133        60
OIR    2025130    131400   -9.4800 -136.4600      39.8        80       131        60
OIR    2025130    131400   -9.4800 -136.4700      39.8        80       129        60
OIR    2025130    131400   -9.4800 -136.4800      39.8        79       127        60
OIR    2025130    131400   -9.4800 -136.4900      39.8        79       127        60
OIR    2025130    131400   -9.4800 -136.5000      39.8        79       128        60
OIR    2025130    131400   -9.4800 -136.5100      39.8        79       131        60
OIR    2025130    131400   -9.4800 -136.5200      39.8        79       136        60
OIR    2025130    131400   -9.4800 -136.5300      39.8        79       137        60
OIR    2025130    131400   -9.4800 -136.5400      39.6        79       139        60
OIR    2025130    131400   -9.4800 -136.5500      37.6        79       138        60
OIR    2025130    131400   -9.4800 -136.5600      33.0        77       137        60
OIR    2025130    131400   -9.4800 -136.5700      27.0        75       135        60
OIR    2025130    131400   -9.4800 -136.5800      26.9        75       134        60
OIR    2025130    131400   -9.4800 -136.5900      26.9        75       132        60
OIR    2025130    131400   -9.4800 -136.6000      26.8        75       130        60
OIR    2025130    131400   -9.4800 -136.6100      26.8        75       129        60
OIR    2025130    131400   -9.4800 -136.6200      26.8        75       127        60
OIR    2025130    131400   -9.4800 -136.6300      26.8        75       125        60
OIR    2025130    131400   -9.4800 -136.6400      26.7        75       124        60
OIR    2025130    131400   -9.4800 -136.6500      26.7        75       124        60
OIR    2025130    131400   -9.4800 -136.6600      26.7        75       123        60
OIR    2025130    131400   -9.4800 -136.6700      26.7        75       123        60
OIR    2025130    131400   -9.4800 -136.6800      26.6        75       122        60
OIR    2025130    131400   -9.4800 -136.6900      26.6        74       122        60
OIR    2025130    131400   -9.4800 -136.7000      26.6        74       123        60
OIR    2025130    131400   -9.4800 -136.7100      26.5        74       122        60
OIR    2025130    131400   -9.4800 -136.7200      26.4        74       121        60
OIR    2025130    131400   -9.4800 -136.7300      26.4        74       120        60
OIR    2025130    131400   -9.4800 -136.7400      26.3        74       119        60
OIR    2025130    131400   -9.4800 -136.7500      26.2        74       116        60
OIR    2025130    131400   -9.4800 -136.7600      26.2        73       115        60
OIR    2025130    131400   -9.4800 -136.7700      26.2        73       113        60
OIR    2025130    131400   -9.4800 -136.7800      26.1        73       111        60
OIR    2025130    131400   -9.4800 -136.7900      26.1        73       111        60
OIR    2025130    131400   -9.4800 -136.8000      26.0        73       111        60
OIR    2025130    131400   -9.4800 -136.8100      26.1        72       110        60
OIR    2025130    131400   -9.4800 -136.8200      26.4        71       110        60
OIR    2025130    131400   -9.4800 -136.8300      26.7        70       114        60
OIR    2025130    131400   -9.4800 -136.8400      27.2        68       114        60
OIR    2025130    131400   -9.4800 -136.8500      27.5        66       114        60
OIR    2025130    131400   -9.4800 -136.8600      27.7        65       112        60
OIR    2025130    131400   -9.4800 -136.8700      27.8        65       111        60
OIR    2025130    131400   -9.4800 -136.8800      27.8        64       110        60
OIR    2025130    131400   -9.4800 -136.8900      27.9        64       109        60
OIR    2025130    131400   -9.4800 -136.9000      27.9        64       109        60
OIR    2025130    131400   -9.4800 -136.9100      28.0        64       109        60
OIR    2025130    131400   -9.4800 -136.9200      28.0        64       108        60
OIR    2025130    131400   -9.4800 -136.9300      28.1        64       108        60
OIR    2025130    131400   -9.4800 -136.9400      28.2        64       108        60
OIR    2025130    131400   -9.4800 -136.9500      28.3        64       107        60
OIR    2025130    131400   -9.4800 -136.9600      28.4        64       107        60
OIR    2025130    131400   -9.4800 -136.9700      28.4        64       108        60
OIR    2025130    131400   -9.4800 -136.9800      28.4        64       109        60
OIR    2025130    131400   -9.4800 -136.9900      28.5        64       108        60
OIR    2025130    131400   -9.4800 -137.0000      28.5        64       107        60
OIR    2025130    131400   -9.4800 -137.0100      28.5        64       107        60
OIR    2025130    131400   -9.4800 -137.0200      28.6        64       107        60
OIR    2025130    131400   -9.4800 -137.0300      28.6        65       107        60
OIR    2025130    131400   -9.4800 -137.0400      28.6        65       107        60
OIR    2025130    131400   -9.4800 -137.0500      28.6        65       107        60
OIR    2025130    131400   -9.4800 -137.0600      28.7        65       107        60
OIR    2025130    131400   -9.4800 -137.0700      28.7        65       108        60
OIR    2025130    131400   -9.4800 -137.0800      28.7        65       110        60
OIR    2025130    131400   -9.4800 -137.0900      28.7        65       112        60
OIR    2025130    131400   -9.4800 -137.1000      28.7        65       112        60
OIR    2025130    131400   -9.4800 -137.1100      28.8        65       111        60
OIR    2025130    131400   -9.4800 -137.1200      28.9        64       111        60
OIR    2025130    131400   -9.4800 -137.1300      28.9        64       112        60
OIR    2025130    131400   -9.4800 -137.1400      29.0        64       112        60
OIR    2025130    131400   -9.4800 -137.1500      29.0        64       112        60
OIR    2025130    131400   -9.4800 -137.1600      29.0        64       111        60
OIR    2025130    131400   -9.4800 -137.1700      28.9        64       111        60
OIR    2025130    131400   -9.4800 -137.1800      28.8        63       110        60
OIR    2025130    131400   -9.4800 -137.1900      28.8        63       109        60
OIR    2025130    131400   -9.4800 -137.2000      28.7        63       108        60
OIR    2025130    131400   -9.4800 -137.2100      28.5        63       109        60
OIR    2025130    131400   -9.4800 -137.2200      28.3        63       108        60
OIR    2025130    131400   -9.4800 -137.2300      28.1        63       105        60
OIR    2025130    131400   -9.4800 -137.2400      28.1        63       104        60
OIR    2025130    131400   -9.4800 -137.2500      28.0        63       104        60
OIR    2025130    131400   -9.4800 -137.2600      28.0        63       103        60
OIR    2025130    131400   -9.4800 -137.2700      28.0        63       103        60
OIR    2025130    131400   -9.4800 -137.2800      28.0        63       103        60
OIR    2025130    131400   -9.4800 -137.2900      27.9        63       103        60
OIR    2025130    131400   -9.4800 -137.3000      27.9        63       103        60
OIR    2025130    131400   -9.4800 -137.3100      27.9        63       103        60
OIR    2025130    131400   -9.4800 -137.3200      27.9        63       103        60
OIR    2025130    131400   -9.4800 -137.3300      27.8        63       103        60
OIR    2025130    131400   -9.4800 -137.3400      27.6        63       103        60
OIR    2025130    131400   -9.4800 -137.3500      27.3        63       103        60
OIR    2025130    131400   -9.4800 -137.3600      26.7        64       103        60
OIR    2025130    131400   -9.4800 -137.3700      26.0        65       103        60
OIR    2025130    131400   -9.4800 -137.3800      25.2        65       103        60
OIR    2025130    131400   -9.4800 -137.3900      24.0        66       103        60
OIR    2025130    131400   -9.4800 -137.4000      22.9        65       103        60
OIR    2025130    131400   -9.4800 -137.4100      22.0        65       103        60
OIR    2025130    131400   -9.4800 -137.4200      21.5        65       103        60
OIR    2025130    131400   -9.4800 -137.4300      21.0        64       103        60
OIR    2025130    131400   -9.4800 -137.4400      20.5        64       103        60
OIR    2025130    131400   -9.4800 -137.4500      19.8        65       103        60
OIR    2025130    131400   -9.4800 -137.4600      18.8        66       103        60
OIR    2025130    131400   -9.4800 -137.4700      17.4        68       103        60
OIR    2025130    131400   -9.4800 -137.4800      16.1        70       103        60
OIR    2025130    131400   -9.4800 -137.4900      14.5        72       103        60
OIR    2025130    131400   -9.4800 -137.5000      12.6        75       103        60
OIR    2025130    131400   -9.4800 -137.5100      10.3        78       103        60
OIR    2025130    131400   -9.4800 -137.5200       8.1        79       103        60
OIR    2025130    131400   -9.4800 -137.5300       6.6        79       103        60
OIR    2025130    131400   -9.4800 -137.5400       5.6        79       103        60
OIR    2025130    131400   -9.4800 -137.5500       4.7        79       103        60
OIR    2025130    131400   -9.4800 -137.6200       4.0        10       103        60
OIR    2025130    131400   -9.4800 -137.6300       5.6         5       103        60
OIR    2025130    131400   -9.4800 -137.6400       7.6         2       103        60
OIR    2025130    131400   -9.4800 -137.6500       8.9         0       103        60
OIR    2025130    131400   -9.4800 -137.6600       9.2       360       103        60
OIR    2025130    131400   -9.4800 -137.6700       9.3       359       103        60
OIR    2025130    131400   -9.4800 -137.6800       9.3       358       103        60
OIR    2025130    131400   -9.4800 -137.6900       9.6       358       104        60
OIR    2025130    131400   -9.4800 -137.7000      10.8       356       104        60
OIR    2025130    131400   -9.4800 -137.7100      12.7       354       104        60
OIR    2025130    131400   -9.4800 -137.7200      15.4       355       104        60
OIR    2025130    131400   -9.4800 -137.7300      17.0       356       104        60
OIR    2025130    131400   -9.4800 -137.7400      17.0       355       103        60
OIR    2025130    131400   -9.4800 -137.7500      15.6       352       103        60
OIR    2025130    131400   -9.4800 -137.7600      12.7       347       103        60
OIR    2025130    131400   -9.4800 -137.7700       9.5       338       103        60
OIR    2025130    131400   -9.4800 -137.7800       8.5       330       103        60
OIR    2025130    131400   -9.4800 -137.7900       9.4       335       103        60
OIR    2025130    131400   -9.4800 -137.8000      12.1       340       103        60
OIR    2025130    131400   -9.4800 -137.8100      13.4       340       103        60
OIR    2025130    131400   -9.4800 -137.8200      13.4       334       103        60
OIR    2025130    131400   -9.4800 -137.8300      13.1       328       103        60
OIR    2025130    131400   -9.4800 -137.8400      13.2       324       103        60
OIR    2025130    131400   -9.4800 -137.8500      14.2       321       103        60
OIR    2025130    131400   -9.4800 -137.8600      15.5       319       103        60
OIR    2025130    131400   -9.4800 -137.8700      16.4       316       104        60
OIR    2025130    131400   -9.4800 -137.8800      17.0       315       104        60
OIR    2025130    131400   -9.4800 -137.8900      17.2       314       104        60
OIR    2025130    131400   -9.4800 -137.9000      17.6       313       104        60
OIR    2025130    131400   -9.4800 -137.9100      18.0       312       104        60
OIR    2025130    131400   -9.4800 -137.9200      18.2       313       104        60
OIR    2025130    131400   -9.4800 -137.9300      18.6       314       104        60
OIR    2025130    131400   -9.4800 -137.9400      19.1       314       107        60
OIR    2025130    131400   -9.4800 -137.9500      19.3       314       109        60
OIR    2025130    131400   -9.4800 -137.9600      19.3       314       110        60
OIR    2025130    131400   -9.4800 -137.9700      19.3       315       110        60
OIR    2025130    131400   -9.4800 -137.9800      19.3       315       112        60
OIR    2025130    131400   -9.4800 -137.9900      19.3       315       113        60
OIR    2025130    131400   -9.4800 -138.0000      19.4       316       114        60
OIR    2025130    131400   -9.4800 -138.0100      19.5       316       115        60
OIR    2025130    131400   -9.4800 -138.0200      19.6       317       116        60
OIR    2025130    131400   -9.4800 -138.0300      19.7       317       117        60
OIR    2025130    131400   -9.4800 -138.0400      19.8       317       117        60
OIR    2025130    131400   -9.4800 -138.0500      19.9       318       117        60
OIR    2025130    131400   -9.4800 -138.0600      20.1       318       117        60
OIR    2025130    131400   -9.4800 -138.0700      20.1       318       119        60
OIR    2025130    131400   -9.4800 -138.0800      20.2       318       119        60
OIR    2025130    131400   -9.4800 -138.0900      20.3       318       121        60
OIR    2025130    131400   -9.4800 -138.1000      20.3       318       122        60
OIR    2025130    131400   -9.4800 -138.1100      20.4       318       124        60
OIR    2025130    131400   -9.4800 -138.1200      20.7       318       125        60
OIR    2025130    131400   -9.4800 -138.1300      21.1       318       126        60
OIR    2025130    131400   -9.4800 -138.1400      21.7       318       129        60
OIR    2025130    131400   -9.4800 -138.1500      22.1       317       133        60
OIR    2025130    131400   -9.4800 -138.1600      22.3       318       137        60
OIR    2025130    131400   -9.4800 -138.1700      22.4       318       141        60
OIR    2025130    131400   -9.4800 -138.1800      22.6       319       141        60
OIR    2025130    131400   -9.4800 -138.1900      22.7       319       141        60
OIR    2025130    131400   -9.4800 -138.2000      22.9       319       146        60
OIR    2025130    131400   -9.4800 -138.2300      23.2       319       148        60
OIR    2025130    131400   -9.4800 -138.2400      23.1       320       144        60
OIR    2025130    131400   -9.4800 -138.2500      23.0       320       141        60
OIR    2025130    131400   -9.4800 -138.2600      22.7       320       142        60
OIR    2025130    131400   -9.4800 -138.2700      22.4       321       142        60
OIR    2025130    131400   -9.4800 -138.2800      22.0       321       142        60
OIR    2025130    131400   -9.4800 -138.2900      21.6       322       144        60
OIR    2025130    131400   -9.4800 -138.3000      21.3       322       147        60
OIR    2025130    131400   -9.4800 -138.3300      21.3       325       143        60
OIR    2025130    131400   -9.4800 -138.3400      21.5       326       140        60
OIR    2025130    131400   -9.4800 -138.3500      21.7       326       139        60
OIR    2025130    131400   -9.4800 -138.3600      21.8       326       134        60
OIR    2025130    131400   -9.4800 -138.3700      21.9       326       125        60
OIR    2025130    131400   -9.4800 -138.3800      22.0       326       124        60
OIR    2025130    131400   -9.4800 -138.3900      22.0       326       123        60
OIR    2025130    131400   -9.4800 -138.4000      22.1       327       120        60
OIR    2025130    131400   -9.4800 -138.4100      22.2       327       116        60
OIR    2025130    131400   -9.4800 -138.4200      22.5       328       114        60
OIR    2025130    131400   -9.4800 -138.4300      23.0       330       113        60
OIR    2025130    131400   -9.4800 -138.4400      23.9       333       114        60
OIR    2025130    131400   -9.4800 -138.4500      24.4       335       115        60
OIR    2025130    131400   -9.4800 -138.4600      25.2       337       116        60
OIR    2025130    131400   -9.4800 -138.4700      25.6       339       117        60
OIR    2025130    131400   -9.4800 -138.4800      25.7       340       120        60
OIR    2025130    131400   -9.4800 -138.4900      25.6       339       122        60
OIR    2025130    131400   -9.4800 -138.5000      25.5       339       122        60
OIR    2025130    131400   -9.4800 -138.5100      25.2       339       123        60
OIR    2025130    131400   -9.4800 -138.5200      24.9       339       124        60
OIR    2025130    131400   -9.4800 -138.5300      24.5       338       125        60
OIR    2025130    131400   -9.4800 -138.5400      24.2       337       126        60
OIR    2025130    131400   -9.4800 -138.5500      24.0       336       129        60
OIR    2025130    131400   -9.4800 -138.5600      23.8       335       129        60
OIR    2025130    131400   -9.4800 -138.5700      23.5       334       128        60
OIR    2025130    131400   -9.4800 -138.5800      23.2       334       130        60
OIR    2025130    131400   -9.4800 -138.5900      22.9       333       135        60
OIR    2025130    131400   -9.4800 -138.6000      22.7       333       139        60
OIR    2025130    131400   -9.4800 -138.6100      22.4       333       142        60
OIR    2025130    131400   -9.4800 -138.6200      22.1       333       144        60
OIR    2025130    131400   -9.4800 -138.6300      21.8       334       145        60
OIR    2025130    131400   -9.4800 -138.6400      21.3       335       147        60
OIR    2025130    131400   -9.4800 -138.6500      21.0       336       149        60
OIR    2025130    131400   -9.4900 -136.0500      43.7        83       145        60
OIR    2025130    131400   -9.4900 -136.0600      43.7        83       145        60
OIR    2025130    131400   -9.4900 -136.0700      43.7        83       145        60
OIR    2025130    131400   -9.4900 -136.0800      43.7        83       146        60
OIR    2025130    131400   -9.4900 -136.1900      39.2        76       142        60
OIR    2025130    131400   -9.4900 -136.2000      39.2        76       139        60
OIR    2025130    131400   -9.4900 -136.2100      39.2        77       136        60
OIR    2025130    131400   -9.4900 -136.2200      39.2        77       136        60
OIR    2025130    131400   -9.4900 -136.2300      39.1        77       136        60
OIR    2025130    131400   -9.4900 -136.2400      39.1        77       135        60
OIR    2025130    131400   -9.4900 -136.2500      39.1        77       134        60
OIR    2025130    131400   -9.4900 -136.2600      39.1        77       135        60
OIR    2025130    131400   -9.4900 -136.2700      39.1        77       135        60
OIR    2025130    131400   -9.4900 -136.2800      39.1        77       136        60
OIR    2025130    131400   -9.4900 -136.2900      39.1        77       136        60
OIR    2025130    131400   -9.4900 -136.3000      39.2        77       136        60
OIR    2025130    131400   -9.4900 -136.3100      39.3        77       135        60
OIR    2025130    131400   -9.4900 -136.3200      39.4        77       133        60
OIR    2025130    131400   -9.4900 -136.3300      39.4        77       137        60
OIR    2025130    131400   -9.4900 -136.3400      39.3        78       143        60
OIR    2025130    131400   -9.4900 -136.3500      39.1        78       143        60
OIR    2025130    131400   -9.4900 -136.3600      38.9        78       142        60
OIR    2025130    131400   -9.4900 -136.3700      38.9        78       141        60
OIR    2025130    131400   -9.4900 -136.3800      39.0        79       139        60
OIR    2025130    131400   -9.4900 -136.3900      39.2        79       137        60
OIR    2025130    131400   -9.4900 -136.4000      39.5        80       138        60
OIR    2025130    131400   -9.4900 -136.4100      39.6        80       141        60
OIR    2025130    131400   -9.4900 -136.4200      39.6        80       140        60
OIR    2025130    131400   -9.4900 -136.4300      39.6        80       139        60
OIR    2025130    131400   -9.4900 -136.4400      39.6        80       137        60
OIR    2025130    131400   -9.4900 -136.4500      39.7        80       134        60
OIR    2025130    131400   -9.4900 -136.4600      39.7        80       132        60
OIR    2025130    131400   -9.4900 -136.4700      39.7        80       130        60
OIR    2025130    131400   -9.4900 -136.4800      39.8        80       128        60
OIR    2025130    131400   -9.4900 -136.4900      39.8        79       127        60
OIR    2025130    131400   -9.4900 -136.5000      39.8        79       128        60
OIR    2025130    131400   -9.4900 -136.5100      39.8        79       130        60
OIR    2025130    131400   -9.4900 -136.5200      39.8        79       134        60
OIR    2025130    131400   -9.4900 -136.5300      39.7        79       137        60
OIR    2025130    131400   -9.4900 -136.5400      39.6        79       139        60
OIR    2025130    131400   -9.4900 -136.5500      37.6        79       139        60
OIR    2025130    131400   -9.4900 -136.5600      32.9        78       138        60
OIR    2025130    131400   -9.4900 -136.5700      27.0        75       136        60
OIR    2025130    131400   -9.4900 -136.5800      26.9        75       134        60
OIR    2025130    131400   -9.4900 -136.5900      26.9        75       132        60
OIR    2025130    131400   -9.4900 -136.6000      26.9        75       131        60
OIR    2025130    131400   -9.4900 -136.6100      26.9        75       129        60
OIR    2025130    131400   -9.4900 -136.6200      26.9        75       127        60
OIR    2025130    131400   -9.4900 -136.6300      26.9        75       125        60
OIR    2025130    131400   -9.4900 -136.6400      26.8        75       124        60
OIR    2025130    131400   -9.4900 -136.6500      26.8        75       124        60
OIR    2025130    131400   -9.4900 -136.6600      26.8        75       124        60
OIR    2025130    131400   -9.4900 -136.6700      26.7        75       123        60
OIR    2025130    131400   -9.4900 -136.6800      26.7        74       123        60
OIR    2025130    131400   -9.4900 -136.6900      26.7        74       123        60
OIR    2025130    131400   -9.4900 -136.7000      26.6        74       123        60
OIR    2025130    131400   -9.4900 -136.7100      26.6        74       123        60
OIR    2025130    131400   -9.4900 -136.7200      26.5        74       122        60
OIR    2025130    131400   -9.4900 -136.7300      26.4        74       121        60
OIR    2025130    131400   -9.4900 -136.7400      26.3        74       120        60
OIR    2025130    131400   -9.4900 -136.7500      26.3        73       119        60
OIR    2025130    131400   -9.4900 -136.7600      26.2        73       116        60
OIR    2025130    131400   -9.4900 -136.7700      26.2        73       114        60
OIR    2025130    131400   -9.4900 -136.7800      26.1        73       111        60
OIR    2025130    131400   -9.4900 -136.7900      26.0        73       110        60
OIR    2025130    131400   -9.4900 -136.8000      26.0        72       109        60
OIR    2025130    131400   -9.4900 -136.8100      26.1        71       109        60
OIR    2025130    131400   -9.4900 -136.8200      26.6        70       109        60
OIR    2025130    131400   -9.4900 -136.8300      27.0        68       112        60
OIR    2025130    131400   -9.4900 -136.8400      27.5        66       114        60
OIR    2025130    131400   -9.4900 -136.8500      27.7        65       115        60
OIR    2025130    131400   -9.4900 -136.8600      27.7        65       113        60
OIR    2025130    131400   -9.4900 -136.8700      27.8        64       112        60
OIR    2025130    131400   -9.4900 -136.8800      27.8        64       111        60
OIR    2025130    131400   -9.4900 -136.8900      27.9        64       110        60
OIR    2025130    131400   -9.4900 -136.9000      27.9        64       109        60
OIR    2025130    131400   -9.4900 -136.9100      27.9        64       108        60
OIR    2025130    131400   -9.4900 -136.9200      28.0        64       108        60
OIR    2025130    131400   -9.4900 -136.9300      28.1        64       109        60
OIR    2025130    131400   -9.4900 -136.9400      28.2        64       108        60
OIR    2025130    131400   -9.4900 -136.9500      28.3        64       107        60
OIR    2025130    131400   -9.4900 -136.9600      28.3        64       105        60
OIR    2025130    131400   -9.4900 -136.9700      28.4        64       107        60
OIR    2025130    131400   -9.4900 -136.9800      28.4        64       109        60
OIR    2025130    131400   -9.4900 -136.9900      28.4        64       108        60
OIR    2025130    131400   -9.4900 -137.0000      28.4        64       107        60
OIR    2025130    131400   -9.4900 -137.0100      28.5        64       105        60
OIR    2025130    131400   -9.4900 -137.0200      28.5        64       105        60
OIR    2025130    131400   -9.4900 -137.0300      28.5        65       105        60
OIR    2025130    131400   -9.4900 -137.0400      28.6        65       104        60
OIR    2025130    131400   -9.4900 -137.0500      28.6        65       104        60
OIR    2025130    131400   -9.4900 -137.0600      28.6        65       104        60
OIR    2025130    131400   -9.4900 -137.0700      28.7        65       105        60
OIR    2025130    131400   -9.4900 -137.0800      28.7        65       108        60
OIR    2025130    131400   -9.4900 -137.0900      28.7        65       111        60
OIR    2025130    131400   -9.4900 -137.1000      28.8        65       111        60
OIR    2025130    131400   -9.4900 -137.1100      28.9        64       111        60
OIR    2025130    131400   -9.4900 -137.1200      29.0        64       111        60
OIR    2025130    131400   -9.4900 -137.1300      29.1        64       111        60
OIR    2025130    131400   -9.4900 -137.1400      29.2        64       112        60
OIR    2025130    131400   -9.4900 -137.1500      29.3        63       112        60
OIR    2025130    131400   -9.4900 -137.1600      29.2        63       111        60
OIR    2025130    131400   -9.4900 -137.1700      29.1        63       111        60
OIR    2025130    131400   -9.4900 -137.1800      29.0        63       111        60
OIR    2025130    131400   -9.4900 -137.1900      28.9        63       110        60
OIR    2025130    131400   -9.4900 -137.2000      28.8        63       109        60
OIR    2025130    131400   -9.4900 -137.2100      28.6        63       108        60
OIR    2025130    131400   -9.4900 -137.2200      28.4        63       107        60
OIR    2025130    131400   -9.4900 -137.2300      28.2        63       104        60
OIR    2025130    131400   -9.4900 -137.2400      28.2        63       104        60
OIR    2025130    131400   -9.4900 -137.2500      28.1        63       103        60
OIR    2025130    131400   -9.4900 -137.2600      28.1        63       103        60
OIR    2025130    131400   -9.4900 -137.2700      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.2800      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.2900      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3000      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3100      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3200      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3300      28.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3400      27.9        63       103        60
OIR    2025130    131400   -9.4900 -137.3500      27.6        63       103        60
OIR    2025130    131400   -9.4900 -137.3600      27.0        63       103        60
OIR    2025130    131400   -9.4900 -137.3700      26.5        64       103        60
OIR    2025130    131400   -9.4900 -137.3800      25.9        64       103        60
OIR    2025130    131400   -9.4900 -137.3900      25.1        64       103        60
OIR    2025130    131400   -9.4900 -137.4000      23.8        64       103        60
OIR    2025130    131400   -9.4900 -137.4100      22.6        64       103        60
OIR    2025130    131400   -9.4900 -137.4200      21.7        64       103        60
OIR    2025130    131400   -9.4900 -137.4300      21.2        64       103        60
OIR    2025130    131400   -9.4900 -137.4400      20.8        64       103        60
OIR    2025130    131400   -9.4900 -137.4500      20.1        64       103        60
OIR    2025130    131400   -9.4900 -137.4600      19.3        65       103        60
OIR    2025130    131400   -9.4900 -137.4700      18.2        67       103        60
OIR    2025130    131400   -9.4900 -137.4800      17.1        69       103        60
OIR    2025130    131400   -9.4900 -137.4900      15.9        71       103        60
OIR    2025130    131400   -9.4900 -137.5000      14.4        73       103        60
OIR    2025130    131400   -9.4900 -137.5100      12.2        74       103        60
OIR    2025130    131400   -9.4900 -137.5200       9.7        75       103        60
OIR    2025130    131400   -9.4900 -137.5300       7.7        76       103        60
OIR    2025130    131400   -9.4900 -137.5400       6.4        75       103        60
OIR    2025130    131400   -9.4900 -137.5500       5.4        73       103        60
OIR    2025130    131400   -9.4900 -137.5600       4.4        68       103        60
OIR    2025130    131400   -9.4900 -137.6100       4.0        19       103        60
OIR    2025130    131400   -9.4900 -137.6200       4.9        11       103        60
OIR    2025130    131400   -9.4900 -137.6300       6.5         4       103        60
OIR    2025130    131400   -9.4900 -137.6400       8.3         0       103        60
OIR    2025130    131400   -9.4900 -137.6500       9.2         0       103        60
OIR    2025130    131400   -9.4900 -137.6600       9.5       360       103        60
OIR    2025130    131400   -9.4900 -137.6700       9.7       358       103        60
OIR    2025130    131400   -9.4900 -137.6800      10.3       356       103        60
OIR    2025130    131400   -9.4900 -137.6900      12.3       353       103        60
OIR    2025130    131400   -9.4900 -137.7000      16.5       352       103        60
OIR    2025130    131400   -9.4900 -137.7100      19.3       353       104        60
OIR    2025130    131400   -9.4900 -137.7200      20.5       354       104        60
OIR    2025130    131400   -9.4900 -137.7300      20.9       354       103        60
OIR    2025130    131400   -9.4900 -137.7400      21.5       354       103        60
OIR    2025130    131400   -9.4900 -137.7500      21.7       354       103        60
OIR    2025130    131400   -9.4900 -137.7600      21.3       353       103        60
OIR    2025130    131400   -9.4900 -137.7700      20.3       353       103        60
OIR    2025130    131400   -9.4900 -137.7800      18.4       352       103        60
OIR    2025130    131400   -9.4900 -137.7900      17.3       351       103        60
OIR    2025130    131400   -9.4900 -137.8000      18.6       351       103        60
OIR    2025130    131400   -9.4900 -137.8100      18.4       349       103        60
OIR    2025130    131400   -9.4900 -137.8200      18.0       346       103        60
OIR    2025130    131400   -9.4900 -137.8300      17.4       341       103        60
OIR    2025130    131400   -9.4900 -137.8400      17.1       339       103        60
OIR    2025130    131400   -9.4900 -137.8500      16.8       332       103        60
OIR    2025130    131400   -9.4900 -137.8600      17.2       326       103        60
OIR    2025130    131400   -9.4900 -137.8700      17.8       321       104        60
OIR    2025130    131400   -9.4900 -137.8800      18.5       318       104        60
OIR    2025130    131400   -9.4900 -137.8900      18.9       317       104        60
OIR    2025130    131400   -9.4900 -137.9000      19.3       315       104        60
OIR    2025130    131400   -9.4900 -137.9100      19.8       315       103        60
OIR    2025130    131400   -9.4900 -137.9200      20.1       315       103        60
OIR    2025130    131400   -9.4900 -137.9300      20.2       316       104        60
OIR    2025130    131400   -9.4900 -137.9400      20.2       315       107        60
OIR    2025130    131400   -9.4900 -137.9500      20.1       315       109        60
OIR    2025130    131400   -9.4900 -137.9600      19.9       315       110        60
OIR    2025130    131400   -9.4900 -137.9700      19.7       315       110        60
OIR    2025130    131400   -9.4900 -137.9800      19.6       316       111        60
OIR    2025130    131400   -9.4900 -137.9900      19.6       316       112        60
OIR    2025130    131400   -9.4900 -138.0000      19.7       316       113        60
OIR    2025130    131400   -9.4900 -138.0100      19.8       317       114        60
OIR    2025130    131400   -9.4900 -138.0200      19.8       317       116        60
OIR    2025130    131400   -9.4900 -138.0300      20.0       317       116        60
OIR    2025130    131400   -9.4900 -138.0400      20.1       318       116        60
OIR    2025130    131400   -9.4900 -138.0500      20.2       318       117        60
OIR    2025130    131400   -9.4900 -138.0600      20.2       318       117        60
OIR    2025130    131400   -9.4900 -138.0700      20.3       318       117        60
OIR    2025130    131400   -9.4900 -138.0800      20.4       318       117        60
OIR    2025130    131400   -9.4900 -138.0900      20.4       318       120        60
OIR    2025130    131400   -9.4900 -138.1000      20.6       318       122        60
OIR    2025130    131400   -9.4900 -138.1100      20.7       318       124        60
OIR    2025130    131400   -9.4900 -138.1200      21.1       318       125        60
OIR    2025130    131400   -9.4900 -138.1300      21.6       317       126        60
OIR    2025130    131400   -9.4900 -138.1400      22.2       317       129        60
OIR    2025130    131400   -9.4900 -138.1500      22.6       317       132        60
OIR    2025130    131400   -9.4900 -138.1600      22.8       317       137        60
OIR    2025130    131400   -9.4900 -138.1700      23.0       317       142        60
OIR    2025130    131400   -9.4900 -138.1800      23.1       318       142        60
OIR    2025130    131400   -9.4900 -138.1900      23.3       318       143        60
OIR    2025130    131400   -9.4900 -138.2000      23.5       318       147        60
OIR    2025130    131400   -9.4900 -138.2200      23.5       319       148        60
OIR    2025130    131400   -9.4900 -138.2300      23.4       319       145        60
OIR    2025130    131400   -9.4900 -138.2400      23.2       319       141        60
OIR    2025130    131400   -9.4900 -138.2500      23.1       320       139        60
OIR    2025130    131400   -9.4900 -138.2600      22.8       320       140        60
OIR    2025130    131400   -9.4900 -138.2700      22.6       321       141        60
OIR    2025130    131400   -9.4900 -138.2800      22.3       321       142        60
OIR    2025130    131400   -9.4900 -138.2900      22.0       322       143        60
OIR    2025130    131400   -9.4900 -138.3000      21.9       323       144        60
OIR    2025130    131400   -9.4900 -138.3100      21.7       323       149        60
OIR    2025130    131400   -9.4900 -138.3300      21.6       325       143        60
OIR    2025130    131400   -9.4900 -138.3400      21.7       326       140        60
OIR    2025130    131400   -9.4900 -138.3500      21.8       326       138        60
OIR    2025130    131400   -9.4900 -138.3600      21.9       326       133        60
OIR    2025130    131400   -9.4900 -138.3700      21.9       326       126        60
OIR    2025130    131400   -9.4900 -138.3800      22.0       326       124        60
OIR    2025130    131400   -9.4900 -138.3900      22.0       326       123        60
OIR    2025130    131400   -9.4900 -138.4000      22.1       327       121        60
OIR    2025130    131400   -9.4900 -138.4100      22.1       327       117        60
OIR    2025130    131400   -9.4900 -138.4200      22.3       327       116        60
OIR    2025130    131400   -9.4900 -138.4300      22.6       328       115        60
OIR    2025130    131400   -9.4900 -138.4400      23.3       331       115        60
OIR    2025130    131400   -9.4900 -138.4500      24.0       333       116        60
OIR    2025130    131400   -9.4900 -138.4600      24.6       336       116        60
OIR    2025130    131400   -9.4900 -138.4700      25.1       338       116        60
OIR    2025130    131400   -9.4900 -138.4800      25.4       339       119        60
OIR    2025130    131400   -9.4900 -138.4900      25.3       339       121        60
OIR    2025130    131400   -9.4900 -138.5000      25.1       339       122        60
OIR    2025130    131400   -9.4900 -138.5100      24.9       338       123        60
OIR    2025130    131400   -9.4900 -138.5200      24.7       338       124        60
OIR    2025130    131400   -9.4900 -138.5300      24.5       337       125        60
OIR    2025130    131400   -9.4900 -138.5400      24.3       336       127        60
OIR    2025130    131400   -9.4900 -138.5500      24.1       335       130        60
OIR    2025130    131400   -9.4900 -138.5600      23.9       335       131        60
OIR    2025130    131400   -9.4900 -138.5700      23.8       334       131        60
OIR    2025130    131400   -9.4900 -138.5800      23.5       334       133        60
OIR    2025130    131400   -9.4900 -138.5900      23.3       333       138        60
OIR    2025130    131400   -9.4900 -138.6000      22.9       333       143        60
OIR    2025130    131400   -9.4900 -138.6100      22.5       333       148        60
OIR    2025130    131400   -9.5000 -135.9700      43.4        82       145        60
OIR    2025130    131400   -9.5000 -135.9800      43.5        83       145        60
OIR    2025130    131400   -9.5000 -135.9900      43.5        83       146        60
OIR    2025130    131400   -9.5000 -136.0500      43.7        83       145        60
OIR    2025130    131400   -9.5000 -136.0600      43.7        83       145        60
OIR    2025130    131400   -9.5000 -136.0700      43.7        83       145        60
OIR    2025130    131400   -9.5000 -136.0800      43.7        83       147        60
OIR    2025130    131400   -9.5000 -136.1800      39.2        76       144        60
OIR    2025130    131400   -9.5000 -136.1900      39.2        77       143        60
OIR    2025130    131400   -9.5000 -136.2000      39.1        77       140        60
OIR    2025130    131400   -9.5000 -136.2100      39.1        77       137        60
OIR    2025130    131400   -9.5000 -136.2200      39.1        77       137        60
OIR    2025130    131400   -9.5000 -136.2300      39.1        77       138        60
OIR    2025130    131400   -9.5000 -136.2400      39.1        77       135        60
OIR    2025130    131400   -9.5000 -136.2500      39.1        77       133        60
OIR    2025130    131400   -9.5000 -136.2600      39.1        77       133        60
OIR    2025130    131400   -9.5000 -136.2700      39.1        77       134        60
OIR    2025130    131400   -9.5000 -136.2800      39.1        77       135        60
OIR    2025130    131400   -9.5000 -136.2900      39.1        77       135        60
OIR    2025130    131400   -9.5000 -136.3000      39.1        77       134        60
OIR    2025130    131400   -9.5000 -136.3100      39.2        77       133        60
OIR    2025130    131400   -9.5000 -136.3200      39.2        77       133        60
OIR    2025130    131400   -9.5000 -136.3300      39.2        77       136        60
OIR    2025130    131400   -9.5000 -136.3400      39.1        77       141        60
OIR    2025130    131400   -9.5000 -136.3500      38.7        77       142        60
OIR    2025130    131400   -9.5000 -136.3600      38.5        78       141        60
OIR    2025130    131400   -9.5000 -136.3700      38.5        78       139        60
OIR    2025130    131400   -9.5000 -136.3800      38.5        78       137        60
OIR    2025130    131400   -9.5000 -136.3900      38.7        79       135        60
OIR    2025130    131400   -9.5000 -136.4000      39.2        80       135        60
OIR    2025130    131400   -9.5000 -136.4100      39.5        80       136        60
OIR    2025130    131400   -9.5000 -136.4200      39.6        80       137        60
OIR    2025130    131400   -9.5000 -136.4300      39.6        80       137        60
OIR    2025130    131400   -9.5000 -136.4400      39.6        80       136        60
OIR    2025130    131400   -9.5000 -136.4500      39.6        80       136        60
OIR    2025130    131400   -9.5000 -136.4600      39.6        80       134        60
OIR    2025130    131400   -9.5000 -136.4700      39.7        80       132        60
OIR    2025130    131400   -9.5000 -136.4800      39.7        80       130        60
OIR    2025130    131400   -9.5000 -136.4900      39.8        79       128        60
OIR    2025130    131400   -9.5000 -136.5000      39.8        79       128        60
OIR    2025130    131400   -9.5000 -136.5100      39.7        79       129        60
OIR    2025130    131400   -9.5000 -136.5200      39.7        79       133        60
OIR    2025130    131400   -9.5000 -136.5300      39.7        79       135        60
OIR    2025130    131400   -9.5000 -136.5400      39.6        79       138        60
OIR    2025130    131400   -9.5000 -136.5500      38.3        78       139        60
OIR    2025130    131400   -9.5000 -136.5600      33.5        77       138        60
OIR    2025130    131400   -9.5000 -136.5700      27.0        75       135        60
OIR    2025130    131400   -9.5000 -136.5800      27.0        75       134        60
OIR    2025130    131400   -9.5000 -136.5900      27.0        75       133        60
OIR    2025130    131400   -9.5000 -136.6000      27.0        75       132        60
OIR    2025130    131400   -9.5000 -136.6100      27.0        75       129        60
OIR    2025130    131400   -9.5000 -136.6200      27.0        75       127        60
OIR    2025130    131400   -9.5000 -136.6300      27.0        75       124        60
OIR    2025130    131400   -9.5000 -136.6400      26.9        75       124        60
OIR    2025130    131400   -9.5000 -136.6500      26.9        75       124        60
OIR    2025130    131400   -9.5000 -136.6600      26.8        75       123        60
OIR    2025130    131400   -9.5000 -136.6700      26.8        75       122        60
OIR    2025130    131400   -9.5000 -136.6800      26.8        74       122        60
OIR    2025130    131400   -9.5000 -136.6900      26.7        74       122        60
OIR    2025130    131400   -9.5000 -136.7000      26.7        74       122        60
OIR    2025130    131400   -9.5000 -136.7100      26.6        74       122        60
OIR    2025130    131400   -9.5000 -136.7200      26.6        74       121        60
OIR    2025130    131400   -9.5000 -136.7300      26.5        74       121        60
OIR    2025130    131400   -9.5000 -136.7400      26.4        73       121        60
OIR    2025130    131400   -9.5000 -136.7500      26.3        73       117        60
OIR    2025130    131400   -9.5000 -136.7600      26.3        73       115        60
OIR    2025130    131400   -9.5000 -136.7700      26.2        73       113        60
OIR    2025130    131400   -9.5000 -136.7800      26.2        72       110        60
OIR    2025130    131400   -9.5000 -136.7900      26.1        72       109        60
OIR    2025130    131400   -9.5000 -136.8000      26.1        71       108        60
OIR    2025130    131400   -9.5000 -136.8100      26.2        70       107        60
OIR    2025130    131400   -9.5000 -136.8200      26.6        68       107        60
OIR    2025130    131400   -9.5000 -136.8300      27.1        67       110        60
OIR    2025130    131400   -9.5000 -136.8400      27.5        65       112        60
OIR    2025130    131400   -9.5000 -136.8500      27.7        65       114        60
OIR    2025130    131400   -9.5000 -136.8600      27.7        64       113        60
OIR    2025130    131400   -9.5000 -136.8700      27.7        64       111        60
OIR    2025130    131400   -9.5000 -136.8800      27.8        64       110        60
OIR    2025130    131400   -9.5000 -136.8900      27.8        64       108        60
OIR    2025130    131400   -9.5000 -136.9000      27.9        64       108        60
OIR    2025130    131400   -9.5000 -136.9100      27.9        64       108        60
OIR    2025130    131400   -9.5000 -136.9200      28.0        64       109        60
OIR    2025130    131400   -9.5000 -136.9300      28.1        64       110        60
OIR    2025130    131400   -9.5000 -136.9400      28.2        64       108        60
OIR    2025130    131400   -9.5000 -136.9500      28.2        64       107        60
OIR    2025130    131400   -9.5000 -136.9600      28.3        64       104        60
OIR    2025130    131400   -9.5000 -136.9700      28.3        64       105        60
OIR    2025130    131400   -9.5000 -136.9800      28.4        64       107        60
OIR    2025130    131400   -9.5000 -136.9900      28.4        64       107        60
OIR    2025130    131400   -9.5000 -137.0000      28.4        64       107        60
OIR    2025130    131400   -9.5000 -137.0100      28.4        64       107        60
OIR    2025130    131400   -9.5000 -137.0200      28.4        64       107        60
OIR    2025130    131400   -9.5000 -137.0300      28.5        64       107        60
OIR    2025130    131400   -9.5000 -137.0400      28.5        65       105        60
OIR    2025130    131400   -9.5000 -137.0500      28.6        65       104        60
OIR    2025130    131400   -9.5000 -137.0600      28.6        65       104        60
OIR    2025130    131400   -9.5000 -137.0700      28.7        65       104        60
OIR    2025130    131400   -9.5000 -137.0800      28.7        65       105        60
OIR    2025130    131400   -9.5000 -137.0900      28.8        64       108        60
OIR    2025130    131400   -9.5000 -137.1000      28.9        64       110        60
OIR    2025130    131400   -9.5000 -137.1100      29.0        64       111        60
OIR    2025130    131400   -9.5000 -137.1200      29.2        64       111        60
OIR    2025130    131400   -9.5000 -137.1300      29.4        63       111        60
OIR    2025130    131400   -9.5000 -137.1400      29.6        63       111        60
OIR    2025130    131400   -9.5000 -137.1500      29.7        63       112        60
OIR    2025130    131400   -9.5000 -137.1600      29.7        63       112        60
OIR    2025130    131400   -9.5000 -137.1700      29.6        63       112        60
OIR    2025130    131400   -9.5000 -137.1800      29.4        63       111        60
OIR    2025130    131400   -9.5000 -137.1900      29.1        63       110        60
OIR    2025130    131400   -9.5000 -137.2000      29.0        63       108        60
OIR    2025130    131400   -9.5000 -137.2100      28.8        63       107        60
OIR    2025130    131400   -9.5000 -137.2200      28.6        62       107        60
OIR    2025130    131400   -9.5000 -137.2300      28.4        62       105        60
OIR    2025130    131400   -9.5000 -137.2400      28.3        63       104        60
OIR    2025130    131400   -9.5000 -137.2500      28.3        63       104        60
OIR    2025130    131400   -9.5000 -137.2600      28.2        63       103        60
OIR    2025130    131400   -9.5000 -137.2700      28.1        63       103        60
OIR    2025130    131400   -9.5000 -137.2800      28.1        63       103        60
OIR    2025130    131400   -9.5000 -137.2900      28.1        63       103        60
OIR    2025130    131400   -9.5000 -137.3000      28.2        63       103        60
OIR    2025130    131400   -9.5000 -137.3100      28.3        62       103        60
OIR    2025130    131400   -9.5000 -137.3200      28.4        62       103        60
OIR    2025130    131400   -9.5000 -137.3300      28.4        62       103        60
OIR    2025130    131400   -9.5000 -137.3400      28.5        62       103        60
OIR    2025130    131400   -9.5000 -137.3500      28.5        61       103        60
OIR    2025130    131400   -9.5000 -137.3600      28.4        61       103        60
OIR    2025130    131400   -9.5000 -137.3700      28.0        61       103        60
OIR    2025130    131400   -9.5000 -137.3800      27.2        62       103        60
OIR    2025130    131400   -9.5000 -137.3900      26.3        62       103        60
OIR    2025130    131400   -9.5000 -137.4000      24.9        63       103        60
OIR    2025130    131400   -9.5000 -137.4100      23.6        63       103        60
OIR    2025130    131400   -9.5000 -137.4200      22.4        63       103        60
OIR    2025130    131400   -9.5000 -137.4300      21.6        63       103        60
OIR    2025130    131400   -9.5000 -137.4400      21.0        63       103        60
OIR    2025130    131400   -9.5000 -137.4500      20.4        64       103        60
OIR    2025130    131400   -9.5000 -137.4600      19.6        65       103        60
OIR    2025130    131400   -9.5000 -137.4700      18.7        66       103        60
OIR    2025130    131400   -9.5000 -137.4800      17.8        67       103        60
OIR    2025130    131400   -9.5000 -137.4900      16.9        68       103        60
OIR    2025130    131400   -9.5000 -137.5000      15.7        70       103        60
OIR    2025130    131400   -9.5000 -137.5100      14.0        71       103        60
OIR    2025130    131400   -9.5000 -137.5200      11.6        72       103        60
OIR    2025130    131400   -9.5000 -137.5300       9.4        71       103        60
OIR    2025130    131400   -9.5000 -137.5400       7.7        68       103        60
OIR    2025130    131400   -9.5000 -137.5500       6.5        65       103        60
OIR    2025130    131400   -9.5000 -137.5600       5.7        57       103        60
OIR    2025130    131400   -9.5000 -137.5700       4.8        52       103        60
OIR    2025130    131400   -9.5000 -137.5800       4.2        47       103        60
OIR    2025130    131400   -9.5000 -137.5900       4.0        38       103        60
OIR    2025130    131400   -9.5000 -137.6000       4.3        25       103        60
OIR    2025130    131400   -9.5000 -137.6100       5.2        16       103        60
OIR    2025130    131400   -9.5000 -137.6200       6.3        10       103        60
OIR    2025130    131400   -9.5000 -137.6300       7.8         3       103        60
OIR    2025130    131400   -9.5000 -137.6400       9.0       360       103        60
OIR    2025130    131400   -9.5000 -137.6500       9.7       359       103        60
OIR    2025130    131400   -9.5000 -137.6600      10.1       359       103        60
OIR    2025130    131400   -9.5000 -137.6700      11.1       356       103        60
OIR    2025130    131400   -9.5000 -137.6800      13.6       351       103        60
OIR    2025130    131400   -9.5000 -137.6900      17.2       349       103        60
OIR    2025130    131400   -9.5000 -137.7000      20.2       351       103        60
OIR    2025130    131400   -9.5000 -137.7100      21.0       353       103        60
OIR    2025130    131400   -9.5000 -137.7200      21.4       353       103        60
OIR    2025130    131400   -9.5000 -137.7300      21.8       354       103        60
OIR    2025130    131400   -9.5000 -137.7400      22.1       354       103        60
OIR    2025130    131400   -9.5000 -137.7500      22.2       354       103        60
OIR    2025130    131400   -9.5000 -137.7600      22.3       354       103        60
OIR    2025130    131400   -9.5000 -137.7700      22.3       353       103        60
OIR    2025130    131400   -9.5000 -137.7800      22.3       354       103        60
OIR    2025130    131400   -9.5000 -137.7900      22.4       354       103        60
OIR    2025130    131400   -9.5000 -137.8000      21.8       354       103        60
OIR    2025130    131400   -9.5000 -137.8100      21.4       352       103        60
OIR    2025130    131400   -9.5000 -137.8200      21.0       349       103        60
OIR    2025130    131400   -9.5000 -137.8300      20.5       346       103        60
OIR    2025130    131400   -9.5000 -137.8400      20.3       345       103        60
OIR    2025130    131400   -9.5000 -137.8500      19.6       341       103        60
OIR    2025130    131400   -9.5000 -137.8600      19.2       333       103        60
OIR    2025130    131400   -9.5000 -137.8700      19.3       326       103        60
OIR    2025130    131400   -9.5000 -137.8800      19.9       320       103        60
OIR    2025130    131400   -9.5000 -137.8900      20.3       318       103        60
OIR    2025130    131400   -9.5000 -137.9000      20.6       317       103        60
OIR    2025130    131400   -9.5000 -137.9100      20.9       317       103        60
OIR    2025130    131400   -9.5000 -137.9200      21.1       316       104        60
OIR    2025130    131400   -9.5000 -137.9300      21.0       316       104        60
OIR    2025130    131400   -9.5000 -137.9400      20.9       316       107        60
OIR    2025130    131400   -9.5000 -137.9500      20.7       316       109        60
OIR    2025130    131400   -9.5000 -137.9600      20.4       316       110        60
OIR    2025130    131400   -9.5000 -137.9700      20.2       316       111        60
OIR    2025130    131400   -9.5000 -137.9800      20.1       316       112        60
OIR    2025130    131400   -9.5000 -137.9900      20.0       317       112        60
OIR    2025130    131400   -9.5000 -138.0000      20.0       317       112        60
OIR    2025130    131400   -9.5000 -138.0100      20.1       317       114        60
OIR    2025130    131400   -9.5000 -138.0200      20.1       317       116        60
OIR    2025130    131400   -9.5000 -138.0300      20.2       318       116        60
OIR    2025130    131400   -9.5000 -138.0400      20.3       318       116        60
OIR    2025130    131400   -9.5000 -138.0500      20.3       318       116        60
OIR    2025130    131400   -9.5000 -138.0600      20.4       318       117        60
OIR    2025130    131400   -9.5000 -138.0700      20.5       318       119        60
OIR    2025130    131400   -9.5000 -138.0800      20.6       318       120        60
OIR    2025130    131400   -9.5000 -138.0900      20.7       318       121        60
OIR    2025130    131400   -9.5000 -138.1000      20.8       318       122        60
OIR    2025130    131400   -9.5000 -138.1100      21.0       318       124        60
OIR    2025130    131400   -9.5000 -138.1200      21.4       318       125        60
OIR    2025130    131400   -9.5000 -138.1300      22.0       317       126        60
OIR    2025130    131400   -9.5000 -138.1400      22.6       317       129        60
OIR    2025130    131400   -9.5000 -138.1500      22.9       317       132        60
OIR    2025130    131400   -9.5000 -138.1600      23.1       317       137        60
OIR    2025130    131400   -9.5000 -138.1700      23.3       317       141        60
OIR    2025130    131400   -9.5000 -138.1800      23.4       317       144        60
OIR    2025130    131400   -9.5000 -138.1900      23.6       317       147        60
OIR    2025130    131400   -9.5000 -138.2000      23.7       318       147        60
OIR    2025130    131400   -9.5000 -138.2100      23.7       318       145        60
OIR    2025130    131400   -9.5000 -138.2200      23.6       318       143        60
OIR    2025130    131400   -9.5000 -138.2300      23.5       319       141        60
OIR    2025130    131400   -9.5000 -138.2400      23.3       319       139        60
OIR    2025130    131400   -9.5000 -138.2500      23.1       320       138        60
OIR    2025130    131400   -9.5000 -138.2600      22.9       320       138        60
OIR    2025130    131400   -9.5000 -138.2700      22.7       321       140        60
OIR    2025130    131400   -9.5000 -138.2800      22.5       321       142        60
OIR    2025130    131400   -9.5000 -138.2900      22.2       322       141        60
OIR    2025130    131400   -9.5000 -138.3000      22.1       323       141        60
OIR    2025130    131400   -9.5000 -138.3100      22.0       323       147        60
OIR    2025130    131400   -9.5000 -138.3200      21.9       324       148        60
OIR    2025130    131400   -9.5000 -138.3300      21.8       325       141        60
OIR    2025130    131400   -9.5000 -138.3400      21.8       326       138        60
OIR    2025130    131400   -9.5000 -138.3500      21.8       326       136        60
OIR    2025130    131400   -9.5000 -138.3600      21.9       326       132        60
OIR    2025130    131400   -9.5000 -138.3700      21.9       326       127        60
OIR    2025130    131400   -9.5000 -138.3800      21.9       326       125        60
OIR    2025130    131400   -9.5000 -138.3900      22.0       326       124        60
OIR    2025130    131400   -9.5000 -138.4000      22.1       327       122        60
OIR    2025130    131400   -9.5000 -138.4100      22.1       327       120        60
OIR    2025130    131400   -9.5000 -138.4200      22.2       327       117        60
OIR    2025130    131400   -9.5000 -138.4300      22.3       328       116        60
OIR    2025130    131400   -9.5000 -138.4400      22.9       330       116        60
OIR    2025130    131400   -9.5000 -138.4500      23.6       332       116        60
OIR    2025130    131400   -9.5000 -138.4600      24.0       334       116        60
OIR    2025130    131400   -9.5000 -138.4700      24.4       336       116        60
OIR    2025130    131400   -9.5000 -138.4800      24.7       337       119        60
OIR    2025130    131400   -9.5000 -138.4900      24.8       338       120        60
OIR    2025130    131400   -9.5000 -138.5000      24.7       338       120        60
OIR    2025130    131400   -9.5000 -138.5100      24.6       338       122        60
OIR    2025130    131400   -9.5000 -138.5200      24.5       337       124        60
OIR    2025130    131400   -9.5000 -138.5300      24.4       337       127        60
OIR    2025130    131400   -9.5000 -138.5400      24.3       335       129        60
OIR    2025130    131400   -9.5000 -138.5500      24.2       335       132        60
OIR    2025130    131400   -9.5000 -138.5600      24.0       334       133        60
OIR    2025130    131400   -9.5000 -138.5700      23.9       334       134        60
OIR    2025130    131400   -9.5000 -138.5800      23.7       334       137        60
OIR    2025130    131400   -9.5000 -138.5900      23.4       333       141        60
OIR    2025130    131400   -9.5100 -135.9600      43.3        82       146        60
OIR    2025130    131400   -9.5100 -135.9700      43.4        82       144        60
OIR    2025130    131400   -9.5100 -135.9800      43.5        83       143        60
OIR    2025130    131400   -9.5100 -135.9900      43.5        83       144        60
OIR    2025130    131400   -9.5100 -136.0000      43.6        83       147        60
OIR    2025130    131400   -9.5100 -136.0500      43.7        83       146        60
OIR    2025130    131400   -9.5100 -136.0600      43.7        83       145        60
OIR    2025130    131400   -9.5100 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.5100 -136.1700      39.1        76       142        60
OIR    2025130    131400   -9.5100 -136.1800      39.1        76       141        60
OIR    2025130    131400   -9.5100 -136.1900      39.1        77       142        60
OIR    2025130    131400   -9.5100 -136.2000      39.1        77       140        60
OIR    2025130    131400   -9.5100 -136.2100      39.1        77       136        60
OIR    2025130    131400   -9.5100 -136.2200      39.1        77       138        60
OIR    2025130    131400   -9.5100 -136.2300      39.1        77       139        60
OIR    2025130    131400   -9.5100 -136.2400      39.1        77       135        60
OIR    2025130    131400   -9.5100 -136.2500      39.1        77       133        60
OIR    2025130    131400   -9.5100 -136.2600      39.1        77       132        60
OIR    2025130    131400   -9.5100 -136.2700      39.0        77       132        60
OIR    2025130    131400   -9.5100 -136.2800      39.0        77       134        60
OIR    2025130    131400   -9.5100 -136.2900      39.0        77       133        60
OIR    2025130    131400   -9.5100 -136.3000      39.1        77       132        60
OIR    2025130    131400   -9.5100 -136.3100      39.1        77       132        60
OIR    2025130    131400   -9.5100 -136.3200      39.1        77       132        60
OIR    2025130    131400   -9.5100 -136.3300      38.9        77       135        60
OIR    2025130    131400   -9.5100 -136.3400      38.6        77       139        60
OIR    2025130    131400   -9.5100 -136.3500      38.2        77       141        60
OIR    2025130    131400   -9.5100 -136.3600      38.1        78       141        60
OIR    2025130    131400   -9.5100 -136.3700      38.1        78       138        60
OIR    2025130    131400   -9.5100 -136.3800      38.1        78       135        60
OIR    2025130    131400   -9.5100 -136.3900      38.2        79       133        60
OIR    2025130    131400   -9.5100 -136.4000      38.7        80       132        60
OIR    2025130    131400   -9.5100 -136.4100      39.2        80       133        60
OIR    2025130    131400   -9.5100 -136.4200      39.5        80       134        60
OIR    2025130    131400   -9.5100 -136.4300      39.6        80       135        60
OIR    2025130    131400   -9.5100 -136.4400      39.6        80       135        60
OIR    2025130    131400   -9.5100 -136.4500      39.6        80       136        60
OIR    2025130    131400   -9.5100 -136.4600      39.6        80       135        60
OIR    2025130    131400   -9.5100 -136.4700      39.6        80       134        60
OIR    2025130    131400   -9.5100 -136.4800      39.7        80       132        60
OIR    2025130    131400   -9.5100 -136.4900      39.7        79       130        60
OIR    2025130    131400   -9.5100 -136.5000      39.8        79       128        60
OIR    2025130    131400   -9.5100 -136.5100      39.7        79       128        60
OIR    2025130    131400   -9.5100 -136.5200      39.6        79       131        60
OIR    2025130    131400   -9.5100 -136.5300      39.6        79       134        60
OIR    2025130    131400   -9.5100 -136.5400      39.5        78       137        60
OIR    2025130    131400   -9.5100 -136.5500      39.1        78       138        60
OIR    2025130    131400   -9.5100 -136.5600      34.7        77       138        60
OIR    2025130    131400   -9.5100 -136.5700      27.3        75       135        60
OIR    2025130    131400   -9.5100 -136.5800      27.1        75       134        60
OIR    2025130    131400   -9.5100 -136.5900      27.0        75       133        60
OIR    2025130    131400   -9.5100 -136.6000      27.1        75       132        60
OIR    2025130    131400   -9.5100 -136.6100      27.1        75       129        60
OIR    2025130    131400   -9.5100 -136.6200      27.1        75       127        60
OIR    2025130    131400   -9.5100 -136.6300      27.0        75       124        60
OIR    2025130    131400   -9.5100 -136.6400      27.0        75       124        60
OIR    2025130    131400   -9.5100 -136.6500      26.9        75       123        60
OIR    2025130    131400   -9.5100 -136.6600      26.9        75       122        60
OIR    2025130    131400   -9.5100 -136.6700      26.9        74       121        60
OIR    2025130    131400   -9.5100 -136.6800      26.9        74       122        60
OIR    2025130    131400   -9.5100 -136.6900      26.8        74       122        60
OIR    2025130    131400   -9.5100 -136.7000      26.8        74       122        60
OIR    2025130    131400   -9.5100 -136.7100      26.8        74       122        60
OIR    2025130    131400   -9.5100 -136.7200      26.7        74       121        60
OIR    2025130    131400   -9.5100 -136.7300      26.6        73       120        60
OIR    2025130    131400   -9.5100 -136.7400      26.5        73       120        60
OIR    2025130    131400   -9.5100 -136.7500      26.4        73       116        60
OIR    2025130    131400   -9.5100 -136.7600      26.3        72       114        60
OIR    2025130    131400   -9.5100 -136.7700      26.3        72       111        60
OIR    2025130    131400   -9.5100 -136.7800      26.2        71       109        60
OIR    2025130    131400   -9.5100 -136.7900      26.2        70       107        60
OIR    2025130    131400   -9.5100 -136.8000      26.3        69       105        60
OIR    2025130    131400   -9.5100 -136.8100      26.3        68       105        60
OIR    2025130    131400   -9.5100 -136.8200      26.7        67       105        60
OIR    2025130    131400   -9.5100 -136.8300      27.2        66       108        60
OIR    2025130    131400   -9.5100 -136.8400      27.5        65       110        60
OIR    2025130    131400   -9.5100 -136.8500      27.6        64       112        60
OIR    2025130    131400   -9.5100 -136.8600      27.7        64       111        60
OIR    2025130    131400   -9.5100 -136.8700      27.7        64       110        60
OIR    2025130    131400   -9.5100 -136.8800      27.7        64       108        60
OIR    2025130    131400   -9.5100 -136.8900      27.8        64       107        60
OIR    2025130    131400   -9.5100 -136.9000      27.8        64       108        60
OIR    2025130    131400   -9.5100 -136.9100      27.9        64       108        60
OIR    2025130    131400   -9.5100 -136.9200      27.9        64       109        60
OIR    2025130    131400   -9.5100 -136.9300      28.0        64       110        60
OIR    2025130    131400   -9.5100 -136.9400      28.1        64       108        60
OIR    2025130    131400   -9.5100 -136.9500      28.2        64       105        60
OIR    2025130    131400   -9.5100 -136.9600      28.3        64       104        60
OIR    2025130    131400   -9.5100 -136.9700      28.3        64       104        60
OIR    2025130    131400   -9.5100 -136.9800      28.4        64       105        60
OIR    2025130    131400   -9.5100 -136.9900      28.4        64       105        60
OIR    2025130    131400   -9.5100 -137.0000      28.4        64       107        60
OIR    2025130    131400   -9.5100 -137.0100      28.4        64       108        60
OIR    2025130    131400   -9.5100 -137.0200      28.4        64       108        60
OIR    2025130    131400   -9.5100 -137.0300      28.4        64       108        60
OIR    2025130    131400   -9.5100 -137.0400      28.5        64       108        60
OIR    2025130    131400   -9.5100 -137.0500      28.6        64       104        60
OIR    2025130    131400   -9.5100 -137.0600      28.7        64       104        60
OIR    2025130    131400   -9.5100 -137.0700      28.7        64       104        60
OIR    2025130    131400   -9.5100 -137.0800      28.8        64       104        60
OIR    2025130    131400   -9.5100 -137.0900      28.9        64       107        60
OIR    2025130    131400   -9.5100 -137.1000      29.0        64       108        60
OIR    2025130    131400   -9.5100 -137.1100      29.3        63       110        60
OIR    2025130    131400   -9.5100 -137.1200      29.6        63       110        60
OIR    2025130    131400   -9.5100 -137.1300      29.8        63       110        60
OIR    2025130    131400   -9.5100 -137.1400      30.1        62       110        60
OIR    2025130    131400   -9.5100 -137.1500      30.3        62       110        60
OIR    2025130    131400   -9.5100 -137.1600      30.3        62       111        60
OIR    2025130    131400   -9.5100 -137.1700      30.3        62       111        60
OIR    2025130    131400   -9.5100 -137.1800      30.1        62       110        60
OIR    2025130    131400   -9.5100 -137.1900      29.7        62       110        60
OIR    2025130    131400   -9.5100 -137.2000      29.3        62       109        60
OIR    2025130    131400   -9.5100 -137.2100      29.1        62       107        60
OIR    2025130    131400   -9.5100 -137.2200      28.9        62       105        60
OIR    2025130    131400   -9.5100 -137.2300      28.7        62       105        60
OIR    2025130    131400   -9.5100 -137.2400      28.6        62       104        60
OIR    2025130    131400   -9.5100 -137.2500      28.5        62       104        60
OIR    2025130    131400   -9.5100 -137.2600      28.4        62       103        60
OIR    2025130    131400   -9.5100 -137.2700      28.3        62       103        60
OIR    2025130    131400   -9.5100 -137.2800      28.4        62       103        60
OIR    2025130    131400   -9.5100 -137.2900      28.4        62       103        60
OIR    2025130    131400   -9.5100 -137.3000      28.5        62       103        60
OIR    2025130    131400   -9.5100 -137.3100      28.6        62       103        60
OIR    2025130    131400   -9.5100 -137.3200      28.7        61       103        60
OIR    2025130    131400   -9.5100 -137.3300      28.8        61       103        60
OIR    2025130    131400   -9.5100 -137.3400      28.8        61       103        60
OIR    2025130    131400   -9.5100 -137.3500      28.8        60       103        60
OIR    2025130    131400   -9.5100 -137.3600      28.8        60       103        60
OIR    2025130    131400   -9.5100 -137.3700      28.6        60       103        60
OIR    2025130    131400   -9.5100 -137.3800      28.3        60       103        60
OIR    2025130    131400   -9.5100 -137.3900      27.6        61       103        60
OIR    2025130    131400   -9.5100 -137.4000      26.6        61       103        60
OIR    2025130    131400   -9.5100 -137.4100      24.6        62       103        60
OIR    2025130    131400   -9.5100 -137.4200      23.1        62       103        60
OIR    2025130    131400   -9.5100 -137.4300      22.2        62       103        60
OIR    2025130    131400   -9.5100 -137.4400      21.4        63       103        60
OIR    2025130    131400   -9.5100 -137.4500      20.6        63       103        60
OIR    2025130    131400   -9.5100 -137.4600      19.8        64       103        60
OIR    2025130    131400   -9.5100 -137.4700      19.0        65       103        60
OIR    2025130    131400   -9.5100 -137.4800      18.2        66       103        60
OIR    2025130    131400   -9.5100 -137.4900      17.5        67       103        60
OIR    2025130    131400   -9.5100 -137.5000      16.6        68       103        60
OIR    2025130    131400   -9.5100 -137.5100      15.3        68       103        60
OIR    2025130    131400   -9.5100 -137.5200      13.5        68       103        60
OIR    2025130    131400   -9.5100 -137.5300      11.3        65       103        60
OIR    2025130    131400   -9.5100 -137.5400       9.5        61       103        60
OIR    2025130    131400   -9.5100 -137.5500       8.1        57       103        60
OIR    2025130    131400   -9.5100 -137.5600       7.1        53       103        60
OIR    2025130    131400   -9.5100 -137.5700       6.2        49       103        60
OIR    2025130    131400   -9.5100 -137.5800       5.6        42       103        60
OIR    2025130    131400   -9.5100 -137.5900       5.4        32       103        60
OIR    2025130    131400   -9.5100 -137.6000       5.8        20       103        60
OIR    2025130    131400   -9.5100 -137.6100       6.9        13       103        60
OIR    2025130    131400   -9.5100 -137.6200       8.0         7       103        60
OIR    2025130    131400   -9.5100 -137.6300       9.0         3       103        60
OIR    2025130    131400   -9.5100 -137.6400       9.9       360       103        60
OIR    2025130    131400   -9.5100 -137.6500      10.7       358       103        60
OIR    2025130    131400   -9.5100 -137.6600      11.7       357       103        60
OIR    2025130    131400   -9.5100 -137.6700      14.4       352       103        60
OIR    2025130    131400   -9.5100 -137.6800      17.5       349       103        60
OIR    2025130    131400   -9.5100 -137.6900      20.0       350       103        60
OIR    2025130    131400   -9.5100 -137.7000      20.9       352       103        60
OIR    2025130    131400   -9.5100 -137.7100      21.3       353       103        60
OIR    2025130    131400   -9.5100 -137.7200      21.7       353       103        60
OIR    2025130    131400   -9.5100 -137.7300      22.0       354       103        60
OIR    2025130    131400   -9.5100 -137.7400      22.2       354       103        60
OIR    2025130    131400   -9.5100 -137.7500      22.3       354       103        60
OIR    2025130    131400   -9.5100 -137.7600      22.4       354       103        60
OIR    2025130    131400   -9.5100 -137.7700      22.5       353       103        60
OIR    2025130    131400   -9.5100 -137.7800      22.8       354       103        60
OIR    2025130    131400   -9.5100 -137.7900      23.0       354       103        60
OIR    2025130    131400   -9.5100 -137.8000      23.1       354       103        60
OIR    2025130    131400   -9.5100 -137.8100      23.1       353       103        60
OIR    2025130    131400   -9.5100 -137.8200      22.8       351       103        60
OIR    2025130    131400   -9.5100 -137.8300      22.1       349       103        60
OIR    2025130    131400   -9.5100 -137.8400      21.7       347       103        60
OIR    2025130    131400   -9.5100 -137.8500      21.5       345       103        60
OIR    2025130    131400   -9.5100 -137.8600      21.3       339       103        60
OIR    2025130    131400   -9.5100 -137.8700      21.0       332       103        60
OIR    2025130    131400   -9.5100 -137.8800      21.3       323       103        60
OIR    2025130    131400   -9.5100 -137.8900      21.4       320       103        60
OIR    2025130    131400   -9.5100 -137.9000      21.5       319       103        60
OIR    2025130    131400   -9.5100 -137.9100      21.6       318       103        60
OIR    2025130    131400   -9.5100 -137.9200      21.6       317       104        60
OIR    2025130    131400   -9.5100 -137.9300      21.5       317       104        60
OIR    2025130    131400   -9.5100 -137.9400      21.4       317       105        60
OIR    2025130    131400   -9.5100 -137.9500      21.2       317       107        60
OIR    2025130    131400   -9.5100 -137.9600      20.9       317       109        60
OIR    2025130    131400   -9.5100 -137.9700      20.7       317       110        60
OIR    2025130    131400   -9.5100 -137.9800      20.5       317       111        60
OIR    2025130    131400   -9.5100 -137.9900      20.4       317       112        60
OIR    2025130    131400   -9.5100 -138.0000      20.4       317       112        60
OIR    2025130    131400   -9.5100 -138.0100      20.4       318       114        60
OIR    2025130    131400   -9.5100 -138.0200      20.4       318       115        60
OIR    2025130    131400   -9.5100 -138.0300      20.4       318       116        60
OIR    2025130    131400   -9.5100 -138.0400      20.4       318       115        60
OIR    2025130    131400   -9.5100 -138.0500      20.5       318       116        60
OIR    2025130    131400   -9.5100 -138.0600      20.6       318       116        60
OIR    2025130    131400   -9.5100 -138.0700      20.6       318       116        60
OIR    2025130    131400   -9.5100 -138.0800      20.8       319       117        60
OIR    2025130    131400   -9.5100 -138.0900      20.9       319       120        60
OIR    2025130    131400   -9.5100 -138.1000      21.1       319       123        60
OIR    2025130    131400   -9.5100 -138.1100      21.3       318       124        60
OIR    2025130    131400   -9.5100 -138.1200      21.8       318       125        60
OIR    2025130    131400   -9.5100 -138.1300      22.3       317       126        60
OIR    2025130    131400   -9.5100 -138.1400      22.9       317       128        60
OIR    2025130    131400   -9.5100 -138.1500      23.2       317       131        60
OIR    2025130    131400   -9.5100 -138.1600      23.3       317       135        60
OIR    2025130    131400   -9.5100 -138.1700      23.5       317       139        60
OIR    2025130    131400   -9.5100 -138.1800      23.6       317       143        60
OIR    2025130    131400   -9.5100 -138.1900      23.7       317       148        60
OIR    2025130    131400   -9.5100 -138.2000      23.7       317       146        60
OIR    2025130    131400   -9.5100 -138.2100      23.7       318       143        60
OIR    2025130    131400   -9.5100 -138.2200      23.7       318       140        60
OIR    2025130    131400   -9.5100 -138.2300      23.6       318       138        60
OIR    2025130    131400   -9.5100 -138.2400      23.4       319       137        60
OIR    2025130    131400   -9.5100 -138.2500      23.2       320       137        60
OIR    2025130    131400   -9.5100 -138.2600      23.0       320       138        60
OIR    2025130    131400   -9.5100 -138.2700      22.8       321       139        60
OIR    2025130    131400   -9.5100 -138.2800      22.6       322       141        60
OIR    2025130    131400   -9.5100 -138.2900      22.4       322       141        60
OIR    2025130    131400   -9.5100 -138.3000      22.2       323       141        60
OIR    2025130    131400   -9.5100 -138.3100      22.2       323       144        60
OIR    2025130    131400   -9.5100 -138.3200      22.1       324       145        60
OIR    2025130    131400   -9.5100 -138.3300      21.9       325       139        60
OIR    2025130    131400   -9.5100 -138.3400      21.8       326       136        60
OIR    2025130    131400   -9.5100 -138.3500      21.8       326       134        60
OIR    2025130    131400   -9.5100 -138.3600      21.9       326       132        60
OIR    2025130    131400   -9.5100 -138.3700      21.9       326       130        60
OIR    2025130    131400   -9.5100 -138.3800      21.9       326       128        60
OIR    2025130    131400   -9.5100 -138.3900      22.0       326       126        60
OIR    2025130    131400   -9.5100 -138.4000      22.0       327       124        60
OIR    2025130    131400   -9.5100 -138.4100      22.1       327       122        60
OIR    2025130    131400   -9.5100 -138.4200      22.1       327       121        60
OIR    2025130    131400   -9.5100 -138.4300      22.2       327       120        60
OIR    2025130    131400   -9.5100 -138.4400      22.7       329       119        60
OIR    2025130    131400   -9.5100 -138.4500      23.2       331       117        60
OIR    2025130    131400   -9.5100 -138.4600      23.6       333       116        60
OIR    2025130    131400   -9.5100 -138.4700      23.8       334       116        60
OIR    2025130    131400   -9.5100 -138.4800      23.9       335       119        60
OIR    2025130    131400   -9.5100 -138.4900      24.1       336       119        60
OIR    2025130    131400   -9.5100 -138.5000      24.2       337       119        60
OIR    2025130    131400   -9.5100 -138.5100      24.3       337       122        60
OIR    2025130    131400   -9.5100 -138.5200      24.4       336       125        60
OIR    2025130    131400   -9.5100 -138.5300      24.4       335       128        60
OIR    2025130    131400   -9.5100 -138.5400      24.3       335       131        60
OIR    2025130    131400   -9.5100 -138.5500      24.1       334       135        60
OIR    2025130    131400   -9.5100 -138.5600      24.1       334       137        60
OIR    2025130    131400   -9.5100 -138.5700      24.0       334       138        60
OIR    2025130    131400   -9.5100 -138.5800      23.7       334       141        60
OIR    2025130    131400   -9.5100 -138.5900      23.4       334       143        60
OIR    2025130    131400   -9.5200 -135.9500      43.1        82       147        60
OIR    2025130    131400   -9.5200 -135.9600      43.3        82       146        60
OIR    2025130    131400   -9.5200 -135.9700      43.4        82       146        60
OIR    2025130    131400   -9.5200 -135.9800      43.5        82       145        60
OIR    2025130    131400   -9.5200 -135.9900      43.5        83       143        60
OIR    2025130    131400   -9.5200 -136.0000      43.6        83       145        60
OIR    2025130    131400   -9.5200 -136.0100      43.6        83       146        60
OIR    2025130    131400   -9.5200 -136.0600      43.7        83       146        60
OIR    2025130    131400   -9.5200 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.5200 -136.0800      43.7        83       147        60
OIR    2025130    131400   -9.5200 -136.1600      39.0        76       146        60
OIR    2025130    131400   -9.5200 -136.1700      39.1        76       142        60
OIR    2025130    131400   -9.5200 -136.1800      39.1        76       140        60
OIR    2025130    131400   -9.5200 -136.1900      39.1        77       140        60
OIR    2025130    131400   -9.5200 -136.2000      39.1        77       138        60
OIR    2025130    131400   -9.5200 -136.2100      39.1        77       136        60
OIR    2025130    131400   -9.5200 -136.2200      39.1        77       137        60
OIR    2025130    131400   -9.5200 -136.2300      39.0        77       139        60
OIR    2025130    131400   -9.5200 -136.2400      39.0        77       135        60
OIR    2025130    131400   -9.5200 -136.2500      39.0        77       132        60
OIR    2025130    131400   -9.5200 -136.2600      39.0        77       131        60
OIR    2025130    131400   -9.5200 -136.2700      39.0        77       131        60
OIR    2025130    131400   -9.5200 -136.2800      39.0        77       133        60
OIR    2025130    131400   -9.5200 -136.2900      39.0        77       132        60
OIR    2025130    131400   -9.5200 -136.3000      39.0        77       130        60
OIR    2025130    131400   -9.5200 -136.3100      39.0        77       131        60
OIR    2025130    131400   -9.5200 -136.3200      38.9        77       132        60
OIR    2025130    131400   -9.5200 -136.3300      38.5        77       135        60
OIR    2025130    131400   -9.5200 -136.3400      38.2        77       137        60
OIR    2025130    131400   -9.5200 -136.3500      38.0        77       141        60
OIR    2025130    131400   -9.5200 -136.3600      37.9        78       141        60
OIR    2025130    131400   -9.5200 -136.3700      37.9        78       137        60
OIR    2025130    131400   -9.5200 -136.3800      37.9        78       134        60
OIR    2025130    131400   -9.5200 -136.3900      37.9        78       133        60
OIR    2025130    131400   -9.5200 -136.4000      38.2        79       132        60
OIR    2025130    131400   -9.5200 -136.4100      38.9        80       131        60
OIR    2025130    131400   -9.5200 -136.4200      39.3        80       132        60
OIR    2025130    131400   -9.5200 -136.4300      39.5        80       133        60
OIR    2025130    131400   -9.5200 -136.4400      39.5        80       133        60
OIR    2025130    131400   -9.5200 -136.4500      39.6        80       134        60
OIR    2025130    131400   -9.5200 -136.4600      39.7        80       135        60
OIR    2025130    131400   -9.5200 -136.4700      39.7        79       135        60
OIR    2025130    131400   -9.5200 -136.4800      39.6        79       134        60
OIR    2025130    131400   -9.5200 -136.4900      39.6        79       131        60
OIR    2025130    131400   -9.5200 -136.5000      39.6        79       128        60
OIR    2025130    131400   -9.5200 -136.5100      39.6        79       127        60
OIR    2025130    131400   -9.5200 -136.5200      39.6        78       128        60
OIR    2025130    131400   -9.5200 -136.5300      39.5        78       131        60
OIR    2025130    131400   -9.5200 -136.5400      39.4        78       135        60
OIR    2025130    131400   -9.5200 -136.5500      38.7        78       136        60
OIR    2025130    131400   -9.5200 -136.5600      34.7        76       137        60
OIR    2025130    131400   -9.5200 -136.5700      27.6        75       135        60
OIR    2025130    131400   -9.5200 -136.5800      27.3        75       134        60
OIR    2025130    131400   -9.5200 -136.5900      27.1        75       133        60
OIR    2025130    131400   -9.5200 -136.6000      27.1        75       132        60
OIR    2025130    131400   -9.5200 -136.6100      27.1        75       130        60
OIR    2025130    131400   -9.5200 -136.6200      27.1        75       128        60
OIR    2025130    131400   -9.5200 -136.6300      27.1        75       125        60
OIR    2025130    131400   -9.5200 -136.6400      27.1        75       124        60
OIR    2025130    131400   -9.5200 -136.6500      27.1        75       123        60
OIR    2025130    131400   -9.5200 -136.6600      27.0        75       123        60
OIR    2025130    131400   -9.5200 -136.6700      27.0        74       122        60
OIR    2025130    131400   -9.5200 -136.6800      27.0        74       121        60
OIR    2025130    131400   -9.5200 -136.6900      27.0        74       121        60
OIR    2025130    131400   -9.5200 -136.7000      26.9        74       122        60
OIR    2025130    131400   -9.5200 -136.7100      26.9        74       123        60
OIR    2025130    131400   -9.5200 -136.7200      26.8        73       122        60
OIR    2025130    131400   -9.5200 -136.7300      26.7        73       121        60
OIR    2025130    131400   -9.5200 -136.7400      26.6        72       119        60
OIR    2025130    131400   -9.5200 -136.7500      26.6        72       115        60
OIR    2025130    131400   -9.5200 -136.7600      26.5        71       111        60
OIR    2025130    131400   -9.5200 -136.7700      26.4        71       109        60
OIR    2025130    131400   -9.5200 -136.7800      26.4        70       108        60
OIR    2025130    131400   -9.5200 -136.7900      26.3        69       105        60
OIR    2025130    131400   -9.5200 -136.8000      26.5        68       104        60
OIR    2025130    131400   -9.5200 -136.8100      26.5        67       105        60
OIR    2025130    131400   -9.5200 -136.8200      26.8        66       105        60
OIR    2025130    131400   -9.5200 -136.8300      27.2        65       107        60
OIR    2025130    131400   -9.5200 -136.8400      27.4        64       108        60
OIR    2025130    131400   -9.5200 -136.8500      27.6        64       109        60
OIR    2025130    131400   -9.5200 -136.8600      27.6        64       108        60
OIR    2025130    131400   -9.5200 -136.8700      27.7        64       107        60
OIR    2025130    131400   -9.5200 -136.8800      27.7        64       105        60
OIR    2025130    131400   -9.5200 -136.8900      27.7        64       105        60
OIR    2025130    131400   -9.5200 -136.9000      27.8        64       107        60
OIR    2025130    131400   -9.5200 -136.9100      27.8        64       108        60
OIR    2025130    131400   -9.5200 -136.9200      27.9        63       108        60
OIR    2025130    131400   -9.5200 -136.9300      28.0        63       108        60
OIR    2025130    131400   -9.5200 -136.9400      28.1        63       108        60
OIR    2025130    131400   -9.5200 -136.9500      28.2        63       105        60
OIR    2025130    131400   -9.5200 -136.9600      28.2        63       104        60
OIR    2025130    131400   -9.5200 -136.9700      28.3        63       104        60
OIR    2025130    131400   -9.5200 -136.9800      28.3        64       104        60
OIR    2025130    131400   -9.5200 -136.9900      28.4        64       105        60
OIR    2025130    131400   -9.5200 -137.0000      28.4        64       108        60
OIR    2025130    131400   -9.5200 -137.0100      28.4        64       109        60
OIR    2025130    131400   -9.5200 -137.0200      28.4        64       110        60
OIR    2025130    131400   -9.5200 -137.0300      28.4        64       110        60
OIR    2025130    131400   -9.5200 -137.0400      28.5        64       109        60
OIR    2025130    131400   -9.5200 -137.0500      28.6        64       105        60
OIR    2025130    131400   -9.5200 -137.0600      28.7        64       104        60
OIR    2025130    131400   -9.5200 -137.0700      28.8        64       104        60
OIR    2025130    131400   -9.5200 -137.0800      28.9        64       104        60
OIR    2025130    131400   -9.5200 -137.0900      29.1        63       104        60
OIR    2025130    131400   -9.5200 -137.1000      29.3        63       105        60
OIR    2025130    131400   -9.5200 -137.1100      29.6        63       107        60
OIR    2025130    131400   -9.5200 -137.1200      30.0        62       108        60
OIR    2025130    131400   -9.5200 -137.1300      30.3        62       108        60
OIR    2025130    131400   -9.5200 -137.1400      30.6        61       108        60
OIR    2025130    131400   -9.5200 -137.1500      30.8        61       108        60
OIR    2025130    131400   -9.5200 -137.1600      30.9        61       108        60
OIR    2025130    131400   -9.5200 -137.1700      30.9        61       109        60
OIR    2025130    131400   -9.5200 -137.1800      30.9        61       110        60
OIR    2025130    131400   -9.5200 -137.1900      30.5        61       110        60
OIR    2025130    131400   -9.5200 -137.2000      30.0        61       109        60
OIR    2025130    131400   -9.5200 -137.2100      29.7        61       108        60
OIR    2025130    131400   -9.5200 -137.2200      29.4        61       105        60
OIR    2025130    131400   -9.5200 -137.2300      29.2        61       104        60
OIR    2025130    131400   -9.5200 -137.2400      29.1        61       104        60
OIR    2025130    131400   -9.5200 -137.2500      28.9        61       103        60
OIR    2025130    131400   -9.5200 -137.2600      28.8        61       103        60
OIR    2025130    131400   -9.5200 -137.2700      28.8        61       103        60
OIR    2025130    131400   -9.5200 -137.2800      28.8        61       103        60
OIR    2025130    131400   -9.5200 -137.2900      28.9        61       103        60
OIR    2025130    131400   -9.5200 -137.3000      28.9        61       103        60
OIR    2025130    131400   -9.5200 -137.3100      28.9        61       103        60
OIR    2025130    131400   -9.5200 -137.3200      29.0        61       103        60
OIR    2025130    131400   -9.5200 -137.3300      29.0        60       103        60
OIR    2025130    131400   -9.5200 -137.3400      29.0        60       103        60
OIR    2025130    131400   -9.5200 -137.3500      28.9        60       103        60
OIR    2025130    131400   -9.5200 -137.3600      28.9        60       103        60
OIR    2025130    131400   -9.5200 -137.3700      28.9        60       103        60
OIR    2025130    131400   -9.5200 -137.3800      28.8        60       103        60
OIR    2025130    131400   -9.5200 -137.3900      28.6        60       103        60
OIR    2025130    131400   -9.5200 -137.4000      28.2        60       103        60
OIR    2025130    131400   -9.5200 -137.4100      26.9        60       103        60
OIR    2025130    131400   -9.5200 -137.4200      24.1        61       103        60
OIR    2025130    131400   -9.5200 -137.4300      23.0        62       103        60
OIR    2025130    131400   -9.5200 -137.4400      22.2        62       103        60
OIR    2025130    131400   -9.5200 -137.4500      21.4        62       103        60
OIR    2025130    131400   -9.5200 -137.4600      20.3        63       103        60
OIR    2025130    131400   -9.5200 -137.4700      19.4        64       103        60
OIR    2025130    131400   -9.5200 -137.4800      18.6        65       103        60
OIR    2025130    131400   -9.5200 -137.4900      18.0        66       103        60
OIR    2025130    131400   -9.5200 -137.5000      17.3        66       103        60
OIR    2025130    131400   -9.5200 -137.5100      16.3        65       103        60
OIR    2025130    131400   -9.5200 -137.5200      15.2        63       103        60
OIR    2025130    131400   -9.5200 -137.5300      13.5        61       103        60
OIR    2025130    131400   -9.5200 -137.5400      11.7        57       103        60
OIR    2025130    131400   -9.5200 -137.5500      10.2        54       103        60
OIR    2025130    131400   -9.5200 -137.5600       9.0        50       103        60
OIR    2025130    131400   -9.5200 -137.5700       8.0        44       103        60
OIR    2025130    131400   -9.5200 -137.5800       7.4        35       103        60
OIR    2025130    131400   -9.5200 -137.5900       7.3        26       103        60
OIR    2025130    131400   -9.5200 -137.6000       7.6        18       103        60
OIR    2025130    131400   -9.5200 -137.6100       8.4        11       103        60
OIR    2025130    131400   -9.5200 -137.6200       9.2         7       103        60
OIR    2025130    131400   -9.5200 -137.6300       9.9         4       103        60
OIR    2025130    131400   -9.5200 -137.6400      10.7         0       103        60
OIR    2025130    131400   -9.5200 -137.6500      11.8       358       103        60
OIR    2025130    131400   -9.5200 -137.6600      13.6       354       103        60
OIR    2025130    131400   -9.5200 -137.6700      16.5       351       103        60
OIR    2025130    131400   -9.5200 -137.6800      19.4       350       103        60
OIR    2025130    131400   -9.5200 -137.6900      20.4       351       103        60
OIR    2025130    131400   -9.5200 -137.7000      21.0       352       103        60
OIR    2025130    131400   -9.5200 -137.7100      21.5       353       103        60
OIR    2025130    131400   -9.5200 -137.7200      22.0       353       103        60
OIR    2025130    131400   -9.5200 -137.7300      22.2       353       103        60
OIR    2025130    131400   -9.5200 -137.7400      22.3       354       103        60
OIR    2025130    131400   -9.5200 -137.7500      22.4       354       103        60
OIR    2025130    131400   -9.5200 -137.7600      22.7       354       103        60
OIR    2025130    131400   -9.5200 -137.7700      23.5       353       103        60
OIR    2025130    131400   -9.5200 -137.7800      24.0       354       103        60
OIR    2025130    131400   -9.5200 -137.7900      24.6       354       103        60
OIR    2025130    131400   -9.5200 -137.8000      24.9       354       103        60
OIR    2025130    131400   -9.5200 -137.8100      25.0       354       103        60
OIR    2025130    131400   -9.5200 -137.8200      24.9       353       103        60
OIR    2025130    131400   -9.5200 -137.8300      24.5       352       103        60
OIR    2025130    131400   -9.5200 -137.8400      24.1       351       103        60
OIR    2025130    131400   -9.5200 -137.8500      23.9       349       103        60
OIR    2025130    131400   -9.5200 -137.8600      23.7       344       103        60
OIR    2025130    131400   -9.5200 -137.8700      23.3       338       103        60
OIR    2025130    131400   -9.5200 -137.8800      22.8       328       103        60
OIR    2025130    131400   -9.5200 -137.8900      22.4       322       103        60
OIR    2025130    131400   -9.5200 -137.9000      22.2       320       103        60
OIR    2025130    131400   -9.5200 -137.9100      22.2       319       103        60
OIR    2025130    131400   -9.5200 -137.9200      22.2       318       104        60
OIR    2025130    131400   -9.5200 -137.9300      22.1       318       104        60
OIR    2025130    131400   -9.5200 -137.9400      21.9       318       105        60
OIR    2025130    131400   -9.5200 -137.9500      21.7       317       105        60
OIR    2025130    131400   -9.5200 -137.9600      21.4       317       107        60
OIR    2025130    131400   -9.5200 -137.9700      21.1       318       109        60
OIR    2025130    131400   -9.5200 -137.9800      20.9       318       111        60
OIR    2025130    131400   -9.5200 -137.9900      20.8       318       112        60
OIR    2025130    131400   -9.5200 -138.0000      20.7       318       114        60
OIR    2025130    131400   -9.5200 -138.0100      20.6       318       114        60
OIR    2025130    131400   -9.5200 -138.0200      20.6       318       115        60
OIR    2025130    131400   -9.5200 -138.0300      20.6       318       115        60
OIR    2025130    131400   -9.5200 -138.0400      20.6       318       115        60
OIR    2025130    131400   -9.5200 -138.0500      20.7       318       115        60
OIR    2025130    131400   -9.5200 -138.0600      20.8       319       116        60
OIR    2025130    131400   -9.5200 -138.0700      20.9       319       115        60
OIR    2025130    131400   -9.5200 -138.0800      21.0       319       114        60
OIR    2025130    131400   -9.5200 -138.0900      21.2       319       119        60
OIR    2025130    131400   -9.5200 -138.1000      21.4       319       124        60
OIR    2025130    131400   -9.5200 -138.1100      21.6       319       124        60
OIR    2025130    131400   -9.5200 -138.1200      22.1       318       125        60
OIR    2025130    131400   -9.5200 -138.1300      22.7       317       125        60
OIR    2025130    131400   -9.5200 -138.1400      23.1       317       127        60
OIR    2025130    131400   -9.5200 -138.1500      23.3       317       130        60
OIR    2025130    131400   -9.5200 -138.1600      23.4       317       133        60
OIR    2025130    131400   -9.5200 -138.1700      23.6       317       136        60
OIR    2025130    131400   -9.5200 -138.1800      23.7       317       142        60
OIR    2025130    131400   -9.5200 -138.1900      23.8       317       147        60
OIR    2025130    131400   -9.5200 -138.2000      23.8       317       145        60
OIR    2025130    131400   -9.5200 -138.2100      23.8       318       141        60
OIR    2025130    131400   -9.5200 -138.2200      23.7       318       137        60
OIR    2025130    131400   -9.5200 -138.2300      23.7       318       136        60
OIR    2025130    131400   -9.5200 -138.2400      23.5       319       135        60
OIR    2025130    131400   -9.5200 -138.2500      23.3       320       135        60
OIR    2025130    131400   -9.5200 -138.2600      23.0       320       138        60
OIR    2025130    131400   -9.5200 -138.2700      22.8       321       139        60
OIR    2025130    131400   -9.5200 -138.2800      22.7       322       140        60
OIR    2025130    131400   -9.5200 -138.2900      22.5       322       141        60
OIR    2025130    131400   -9.5200 -138.3000      22.3       323       141        60
OIR    2025130    131400   -9.5200 -138.3100      22.3       323       142        60
OIR    2025130    131400   -9.5200 -138.3200      22.2       324       140        60
OIR    2025130    131400   -9.5200 -138.3300      21.9       325       136        60
OIR    2025130    131400   -9.5200 -138.3400      21.8       326       134        60
OIR    2025130    131400   -9.5200 -138.3500      21.9       326       133        60
OIR    2025130    131400   -9.5200 -138.3600      21.9       326       133        60
OIR    2025130    131400   -9.5200 -138.3700      21.9       326       134        60
OIR    2025130    131400   -9.5200 -138.3800      21.9       326       132        60
OIR    2025130    131400   -9.5200 -138.3900      22.0       327       130        60
OIR    2025130    131400   -9.5200 -138.4000      22.0       327       127        60
OIR    2025130    131400   -9.5200 -138.4100      22.0       327       124        60
OIR    2025130    131400   -9.5200 -138.4200      22.1       327       124        60
OIR    2025130    131400   -9.5200 -138.4300      22.2       328       124        60
OIR    2025130    131400   -9.5200 -138.4400      22.6       329       122        60
OIR    2025130    131400   -9.5200 -138.4500      22.9       331       120        60
OIR    2025130    131400   -9.5200 -138.4600      23.3       332       119        60
OIR    2025130    131400   -9.5200 -138.4700      23.5       334       117        60
OIR    2025130    131400   -9.5200 -138.4800      23.6       334       117        60
OIR    2025130    131400   -9.5200 -138.4900      23.8       335       117        60
OIR    2025130    131400   -9.5200 -138.5000      24.0       335       119        60
OIR    2025130    131400   -9.5200 -138.5100      24.1       335       123        60
OIR    2025130    131400   -9.5200 -138.5200      24.3       335       127        60
OIR    2025130    131400   -9.5200 -138.5300      24.3       334       129        60
OIR    2025130    131400   -9.5200 -138.5400      24.2       334       133        60
OIR    2025130    131400   -9.5200 -138.5500      24.1       334       138        60
OIR    2025130    131400   -9.5200 -138.5600      24.1       334       141        60
OIR    2025130    131400   -9.5200 -138.5700      24.0       334       143        60
OIR    2025130    131400   -9.5200 -138.5800      23.8       334       144        60
OIR    2025130    131400   -9.5200 -138.5900      23.5       334       145        60
OIR    2025130    131400   -9.5300 -135.9800      43.5        82       147        60
OIR    2025130    131400   -9.5300 -135.9900      43.5        82       145        60
OIR    2025130    131400   -9.5300 -136.0000      43.5        83       146        60
OIR    2025130    131400   -9.5300 -136.0100      43.6        83       146        60
OIR    2025130    131400   -9.5300 -136.0600      43.7        83       147        60
OIR    2025130    131400   -9.5300 -136.0700      43.7        83       146        60
OIR    2025130    131400   -9.5300 -136.0800      43.7        83       147        60
OIR    2025130    131400   -9.5300 -136.1600      39.0        76       144        60
OIR    2025130    131400   -9.5300 -136.1700      39.1        76       141        60
OIR    2025130    131400   -9.5300 -136.1800      39.1        76       139        60
OIR    2025130    131400   -9.5300 -136.1900      39.1        77       138        60
OIR    2025130    131400   -9.5300 -136.2000      39.1        77       136        60
OIR    2025130    131400   -9.5300 -136.2100      39.1        77       135        60
OIR    2025130    131400   -9.5300 -136.2200      39.1        77       136        60
OIR    2025130    131400   -9.5300 -136.2300      39.0        77       137        60
OIR    2025130    131400   -9.5300 -136.2400      39.0        77       135        60
OIR    2025130    131400   -9.5300 -136.2500      39.0        77       133        60
OIR    2025130    131400   -9.5300 -136.2600      39.0        77       131        60
OIR    2025130    131400   -9.5300 -136.2700      39.0        77       131        60
OIR    2025130    131400   -9.5300 -136.2800      39.0        77       132        60
OIR    2025130    131400   -9.5300 -136.2900      39.0        77       131        60
OIR    2025130    131400   -9.5300 -136.3000      38.9        77       130        60
OIR    2025130    131400   -9.5300 -136.3100      38.8        77       131        60
OIR    2025130    131400   -9.5300 -136.3200      38.5        77       132        60
OIR    2025130    131400   -9.5300 -136.3300      38.2        77       134        60
OIR    2025130    131400   -9.5300 -136.3400      38.0        77       137        60
OIR    2025130    131400   -9.5300 -136.3500      37.9        77       141        60
OIR    2025130    131400   -9.5300 -136.3600      37.8        78       141        60
OIR    2025130    131400   -9.5300 -136.3700      37.8        78       137        60
OIR    2025130    131400   -9.5300 -136.3800      37.8        78       134        60
OIR    2025130    131400   -9.5300 -136.3900      37.8        78       132        60
OIR    2025130    131400   -9.5300 -136.4000      37.9        79       131        60
OIR    2025130    131400   -9.5300 -136.4100      38.6        79       129        60
OIR    2025130    131400   -9.5300 -136.4200      39.1        79       130        60
OIR    2025130    131400   -9.5300 -136.4300      39.3        79       131        60
OIR    2025130    131400   -9.5300 -136.4400      39.5        79       132        60
OIR    2025130    131400   -9.5300 -136.4500      39.5        79       133        60
OIR    2025130    131400   -9.5300 -136.4600      39.7        79       135        60
OIR    2025130    131400   -9.5300 -136.4700      39.7        79       136        60
OIR    2025130    131400   -9.5300 -136.4800      39.7        79       135        60
OIR    2025130    131400   -9.5300 -136.4900      39.5        79       134        60
OIR    2025130    131400   -9.5300 -136.5000      39.5        79       129        60
OIR    2025130    131400   -9.5300 -136.5100      39.5        79       127        60
OIR    2025130    131400   -9.5300 -136.5200      39.5        78       127        60
OIR    2025130    131400   -9.5300 -136.5300      39.4        78       130        60
OIR    2025130    131400   -9.5300 -136.5400      39.2        78       133        60
OIR    2025130    131400   -9.5300 -136.5500      37.9        77       136        60
OIR    2025130    131400   -9.5300 -136.5600      34.3        75       137        60
OIR    2025130    131400   -9.5300 -136.5700      28.1        75       136        60
OIR    2025130    131400   -9.5300 -136.5800      27.5        75       135        60
OIR    2025130    131400   -9.5300 -136.5900      27.3        75       134        60
OIR    2025130    131400   -9.5300 -136.6000      27.2        75       132        60
OIR    2025130    131400   -9.5300 -136.6100      27.2        75       131        60
OIR    2025130    131400   -9.5300 -136.6200      27.2        75       129        60
OIR    2025130    131400   -9.5300 -136.6300      27.2        75       127        60
OIR    2025130    131400   -9.5300 -136.6400      27.2        75       126        60
OIR    2025130    131400   -9.5300 -136.6500      27.2        75       125        60
OIR    2025130    131400   -9.5300 -136.6600      27.2        74       124        60
OIR    2025130    131400   -9.5300 -136.6700      27.2        74       123        60
OIR    2025130    131400   -9.5300 -136.6800      27.2        74       122        60
OIR    2025130    131400   -9.5300 -136.6900      27.1        74       122        60
OIR    2025130    131400   -9.5300 -136.7000      27.1        74       123        60
OIR    2025130    131400   -9.5300 -136.7100      27.1        73       123        60
OIR    2025130    131400   -9.5300 -136.7200      27.0        73       123        60
OIR    2025130    131400   -9.5300 -136.7300      26.9        73       122        60
OIR    2025130    131400   -9.5300 -136.7400      26.8        72       120        60
OIR    2025130    131400   -9.5300 -136.7500      26.7        71       116        60
OIR    2025130    131400   -9.5300 -136.7600      26.6        71       111        60
OIR    2025130    131400   -9.5300 -136.7700      26.5        70       110        60
OIR    2025130    131400   -9.5300 -136.7800      26.4        69       109        60
OIR    2025130    131400   -9.5300 -136.7900      26.4        68       107        60
OIR    2025130    131400   -9.5300 -136.8000      26.6        67       105        60
OIR    2025130    131400   -9.5300 -136.8100      26.6        66       105        60
OIR    2025130    131400   -9.5300 -136.8200      26.9        65       105        60
OIR    2025130    131400   -9.5300 -136.8300      27.2        64       107        60
OIR    2025130    131400   -9.5300 -136.8400      27.4        64       108        60
OIR    2025130    131400   -9.5300 -136.8500      27.5        64       109        60
OIR    2025130    131400   -9.5300 -136.8600      27.5        63       108        60
OIR    2025130    131400   -9.5300 -136.8700      27.6        63       107        60
OIR    2025130    131400   -9.5300 -136.8800      27.5        63       108        60
OIR    2025130    131400   -9.5300 -136.8900      27.6        63       108        60
OIR    2025130    131400   -9.5300 -136.9000      27.7        63       108        60
OIR    2025130    131400   -9.5300 -136.9100      27.7        63       108        60
OIR    2025130    131400   -9.5300 -136.9200      27.8        63       108        60
OIR    2025130    131400   -9.5300 -136.9300      27.9        63       108        60
OIR    2025130    131400   -9.5300 -136.9400      28.0        63       108        60
OIR    2025130    131400   -9.5300 -136.9500      28.1        63       107        60
OIR    2025130    131400   -9.5300 -136.9600      28.2        63       105        60
OIR    2025130    131400   -9.5300 -136.9700      28.2        63       105        60
OIR    2025130    131400   -9.5300 -136.9800      28.3        63       107        60
OIR    2025130    131400   -9.5300 -136.9900      28.4        63       108        60
OIR    2025130    131400   -9.5300 -137.0000      28.4        64       108        60
OIR    2025130    131400   -9.5300 -137.0100      28.4        64       110        60
OIR    2025130    131400   -9.5300 -137.0200      28.4        64       111        60
OIR    2025130    131400   -9.5300 -137.0300      28.4        64       112        60
OIR    2025130    131400   -9.5300 -137.0400      28.5        64       112        60
OIR    2025130    131400   -9.5300 -137.0500      28.6        64       110        60
OIR    2025130    131400   -9.5300 -137.0600      28.7        64       109        60
OIR    2025130    131400   -9.5300 -137.0700      28.9        63       107        60
OIR    2025130    131400   -9.5300 -137.0800      29.2        63       107        60
OIR    2025130    131400   -9.5300 -137.0900      29.5        62       105        60
OIR    2025130    131400   -9.5300 -137.1000      29.7        62       107        60
OIR    2025130    131400   -9.5300 -137.1100      30.0        61       108        60
OIR    2025130    131400   -9.5300 -137.1200      30.4        61       108        60
OIR    2025130    131400   -9.5300 -137.1300      30.7        61       108        60
OIR    2025130    131400   -9.5300 -137.1400      30.9        60       108        60
OIR    2025130    131400   -9.5300 -137.1500      31.2        60       108        60
OIR    2025130    131400   -9.5300 -137.1600      31.3        61       108        60
OIR    2025130    131400   -9.5300 -137.1700      31.3        61       109        60
OIR    2025130    131400   -9.5300 -137.1800      31.3        61       110        60
OIR    2025130    131400   -9.5300 -137.1900      31.1        61       110        60
OIR    2025130    131400   -9.5300 -137.2000      30.6        61       110        60
OIR    2025130    131400   -9.5300 -137.2100      30.2        61       108        60
OIR    2025130    131400   -9.5300 -137.2200      29.9        60       105        60
OIR    2025130    131400   -9.5300 -137.2300      29.7        60       104        60
OIR    2025130    131400   -9.5300 -137.2400      29.5        61       104        60
OIR    2025130    131400   -9.5300 -137.2500      29.4        61       104        60
OIR    2025130    131400   -9.5300 -137.2600      29.3        60       103        60
OIR    2025130    131400   -9.5300 -137.2700      29.2        60       103        60
OIR    2025130    131400   -9.5300 -137.2800      29.2        60       103        60
OIR    2025130    131400   -9.5300 -137.2900      29.1        60       103        60
OIR    2025130    131400   -9.5300 -137.3000      29.1        60       103        60
OIR    2025130    131400   -9.5300 -137.3100      29.1        60       103        60
OIR    2025130    131400   -9.5300 -137.3200      29.1        60       103        60
OIR    2025130    131400   -9.5300 -137.3300      29.1        60       103        60
OIR    2025130    131400   -9.5300 -137.3400      29.0        60       103        60
OIR    2025130    131400   -9.5300 -137.3500      29.0        60       103        60
OIR    2025130    131400   -9.5300 -137.3600      29.0        60       103        60
OIR    2025130    131400   -9.5300 -137.3700      28.9        60       103        60
OIR    2025130    131400   -9.5300 -137.3800      28.9        60       103        60
OIR    2025130    131400   -9.5300 -137.3900      28.9        60       103        60
OIR    2025130    131400   -9.5300 -137.4000      28.8        60       103        60
OIR    2025130    131400   -9.5300 -137.4100      28.4        60       103        60
OIR    2025130    131400   -9.5300 -137.4200      27.0        60       103        60
OIR    2025130    131400   -9.5300 -137.4300      24.3        61       103        60
OIR    2025130    131400   -9.5300 -137.4400      23.3        61       103        60
OIR    2025130    131400   -9.5300 -137.4500      22.5        62       103        60
OIR    2025130    131400   -9.5300 -137.4600      21.4        62       103        60
OIR    2025130    131400   -9.5300 -137.4700      20.4        63       103        60
OIR    2025130    131400   -9.5300 -137.4800      19.3        64       103        60
OIR    2025130    131400   -9.5300 -137.4900      18.6        64       103        60
OIR    2025130    131400   -9.5300 -137.5000      17.9        63       103        60
OIR    2025130    131400   -9.5300 -137.5100      17.3        62       103        60
OIR    2025130    131400   -9.5300 -137.5200      16.6        60       103        60
OIR    2025130    131400   -9.5300 -137.5300      15.6        58       103        60
OIR    2025130    131400   -9.5300 -137.5400      14.2        54       103        60
OIR    2025130    131400   -9.5300 -137.5500      12.8        51       103        60
OIR    2025130    131400   -9.5300 -137.5600      11.4        46       103        60
OIR    2025130    131400   -9.5300 -137.5700      10.3        38       103        60
OIR    2025130    131400   -9.5300 -137.5800       9.6        30       103        60
OIR    2025130    131400   -9.5300 -137.5900       9.2        23       103        60
OIR    2025130    131400   -9.5300 -137.6000       9.3        17       103        60
OIR    2025130    131400   -9.5300 -137.6100       9.6        12       103        60
OIR    2025130    131400   -9.5300 -137.6200      10.1         8       103        60
OIR    2025130    131400   -9.5300 -137.6300      10.7         5       103        60
OIR    2025130    131400   -9.5300 -137.6400      11.7         2       103        60
OIR    2025130    131400   -9.5300 -137.6500      13.1       357       103        60
OIR    2025130    131400   -9.5300 -137.6600      15.0       354       103        60
OIR    2025130    131400   -9.5300 -137.6700      18.0       352       103        60
OIR    2025130    131400   -9.5300 -137.6800      19.6       351       103        60
OIR    2025130    131400   -9.5300 -137.6900      20.3       352       103        60
OIR    2025130    131400   -9.5300 -137.7000      21.0       353       103        60
OIR    2025130    131400   -9.5300 -137.7100      21.9       353       103        60
OIR    2025130    131400   -9.5300 -137.7200      22.2       353       103        60
OIR    2025130    131400   -9.5300 -137.7300      22.3       353       103        60
OIR    2025130    131400   -9.5300 -137.7400      22.4       354       103        60
OIR    2025130    131400   -9.5300 -137.7500      22.8       354       103        60
OIR    2025130    131400   -9.5300 -137.7600      24.1       353       103        60
OIR    2025130    131400   -9.5300 -137.7700      24.7       353       103        60
OIR    2025130    131400   -9.5300 -137.7800      25.3       353       103        60
OIR    2025130    131400   -9.5300 -137.7900      25.6       354       103        60
OIR    2025130    131400   -9.5300 -137.8000      25.7       354       103        60
OIR    2025130    131400   -9.5300 -137.8100      25.7       354       103        60
OIR    2025130    131400   -9.5300 -137.8200      25.8       354       103        60
OIR    2025130    131400   -9.5300 -137.8300      25.8       354       103        60
OIR    2025130    131400   -9.5300 -137.8400      25.7       353       103        60
OIR    2025130    131400   -9.5300 -137.8500      25.6       350       103        60
OIR    2025130    131400   -9.5300 -137.8600      25.6       347       103        60
OIR    2025130    131400   -9.5300 -137.8700      25.3       342       103        60
OIR    2025130    131400   -9.5300 -137.8800      24.5       334       103        60
OIR    2025130    131400   -9.5300 -137.8900      23.4       326       103        60
OIR    2025130    131400   -9.5300 -137.9000      22.9       322       103        60
OIR    2025130    131400   -9.5300 -137.9100      22.8       320       103        60
OIR    2025130    131400   -9.5300 -137.9200      22.6       319       104        60
OIR    2025130    131400   -9.5300 -137.9300      22.5       319       104        60
OIR    2025130    131400   -9.5300 -137.9400      22.4       318       107        60
OIR    2025130    131400   -9.5300 -137.9500      22.2       318       108        60
OIR    2025130    131400   -9.5300 -137.9600      21.9       318       110        60
OIR    2025130    131400   -9.5300 -137.9700      21.6       318       111        60
OIR    2025130    131400   -9.5300 -137.9800      21.4       318       112        60
OIR    2025130    131400   -9.5300 -137.9900      21.2       319       114        60
OIR    2025130    131400   -9.5300 -138.0000      21.0       319       114        60
OIR    2025130    131400   -9.5300 -138.0100      21.0       319       115        60
OIR    2025130    131400   -9.5300 -138.0200      20.9       319       116        60
OIR    2025130    131400   -9.5300 -138.0300      20.9       319       117        60
OIR    2025130    131400   -9.5300 -138.0400      20.9       319       117        60
OIR    2025130    131400   -9.5300 -138.0500      21.0       319       116        60
OIR    2025130    131400   -9.5300 -138.0600      21.1       319       116        60
OIR    2025130    131400   -9.5300 -138.0700      21.2       319       116        60
OIR    2025130    131400   -9.5300 -138.0800      21.3       320       116        60
OIR    2025130    131400   -9.5300 -138.0900      21.5       320       120        60
OIR    2025130    131400   -9.5300 -138.1000      21.7       319       123        60
OIR    2025130    131400   -9.5300 -138.1100      21.9       319       124        60
OIR    2025130    131400   -9.5300 -138.1200      22.4       318       125        60
OIR    2025130    131400   -9.5300 -138.1300      22.9       318       126        60
OIR    2025130    131400   -9.5300 -138.1400      23.2       317       127        60
OIR    2025130    131400   -9.5300 -138.1500      23.4       317       130        60
OIR    2025130    131400   -9.5300 -138.1600      23.5       317       133        60
OIR    2025130    131400   -9.5300 -138.1700      23.7       317       137        60
OIR    2025130    131400   -9.5300 -138.1800      23.8       317       143        60
OIR    2025130    131400   -9.5300 -138.2000      23.8       317       147        60
OIR    2025130    131400   -9.5300 -138.2100      23.8       318       143        60
OIR    2025130    131400   -9.5300 -138.2200      23.8       318       138        60
OIR    2025130    131400   -9.5300 -138.2300      23.7       318       136        60
OIR    2025130    131400   -9.5300 -138.2400      23.6       318       135        60
OIR    2025130    131400   -9.5300 -138.2500      23.4       320       136        60
OIR    2025130    131400   -9.5300 -138.2600      23.1       321       138        60
OIR    2025130    131400   -9.5300 -138.2700      22.9       321       139        60
OIR    2025130    131400   -9.5300 -138.2800      22.8       322       139        60
OIR    2025130    131400   -9.5300 -138.2900      22.6       323       141        60
OIR    2025130    131400   -9.5300 -138.3000      22.4       323       142        60
OIR    2025130    131400   -9.5300 -138.3100      22.3       323       142        60
OIR    2025130    131400   -9.5300 -138.3200      22.2       324       141        60
OIR    2025130    131400   -9.5300 -138.3300      21.9       325       138        60
OIR    2025130    131400   -9.5300 -138.3400      21.8       326       136        60
OIR    2025130    131400   -9.5300 -138.3500      21.9       326       135        60
OIR    2025130    131400   -9.5300 -138.3600      21.9       326       134        60
OIR    2025130    131400   -9.5300 -138.3700      21.9       327       135        60
OIR    2025130    131400   -9.5300 -138.3800      21.9       327       135        60
OIR    2025130    131400   -9.5300 -138.3900      21.9       327       135        60
OIR    2025130    131400   -9.5300 -138.4000      22.0       327       132        60
OIR    2025130    131400   -9.5300 -138.4100      22.0       327       130        60
OIR    2025130    131400   -9.5300 -138.4200      22.1       327       128        60
OIR    2025130    131400   -9.5300 -138.4300      22.2       328       126        60
OIR    2025130    131400   -9.5300 -138.4400      22.4       329       124        60
OIR    2025130    131400   -9.5300 -138.4500      22.6       330       122        60
OIR    2025130    131400   -9.5300 -138.4600      23.0       332       120        60
OIR    2025130    131400   -9.5300 -138.4700      23.2       333       120        60
OIR    2025130    131400   -9.5300 -138.4800      23.4       334       120        60
OIR    2025130    131400   -9.5300 -138.4900      23.6       334       120        60
OIR    2025130    131400   -9.5300 -138.5000      23.8       335       121        60
OIR    2025130    131400   -9.5300 -138.5100      24.1       334       123        60
OIR    2025130    131400   -9.5300 -138.5200      24.2       334       126        60
OIR    2025130    131400   -9.5300 -138.5300      24.3       334       129        60
OIR    2025130    131400   -9.5300 -138.5400      24.2       334       133        60
OIR    2025130    131400   -9.5300 -138.5500      24.1       334       139        60
OIR    2025130    131400   -9.5300 -138.5600      24.0       334       144        60
OIR    2025130    131400   -9.5300 -138.5700      24.0       334       148        60
OIR    2025130    131400   -9.5400 -136.0700      43.7        83       147        60
OIR    2025130    131400   -9.5400 -136.1600      39.0        76       144        60
OIR    2025130    131400   -9.5400 -136.1700      39.1        76       140        60
OIR    2025130    131400   -9.5400 -136.1800      39.1        76       138        60
OIR    2025130    131400   -9.5400 -136.1900      39.1        77       136        60
OIR    2025130    131400   -9.5400 -136.2000      39.1        77       133        60
OIR    2025130    131400   -9.5400 -136.2100      39.1        77       132        60
OIR    2025130    131400   -9.5400 -136.2200      39.1        77       134        60
OIR    2025130    131400   -9.5400 -136.2300      39.1        77       136        60
OIR    2025130    131400   -9.5400 -136.2400      39.1        77       135        60
OIR    2025130    131400   -9.5400 -136.2500      39.0        77       134        60
OIR    2025130    131400   -9.5400 -136.2600      39.0        77       131        60
OIR    2025130    131400   -9.5400 -136.2700      39.0        77       130        60
OIR    2025130    131400   -9.5400 -136.2800      39.0        77       131        60
OIR    2025130    131400   -9.5400 -136.2900      38.9        77       131        60
OIR    2025130    131400   -9.5400 -136.3000      38.9        77       130        60
OIR    2025130    131400   -9.5400 -136.3100      38.7        77       130        60
OIR    2025130    131400   -9.5400 -136.3200      38.2        77       131        60
OIR    2025130    131400   -9.5400 -136.3300      38.0        77       133        60
OIR    2025130    131400   -9.5400 -136.3400      38.0        77       136        60
OIR    2025130    131400   -9.5400 -136.3500      37.9        77       142        60
OIR    2025130    131400   -9.5400 -136.3600      37.8        77       142        60
OIR    2025130    131400   -9.5400 -136.3700      37.8        78       138        60
OIR    2025130    131400   -9.5400 -136.3800      37.8        78       134        60
OIR    2025130    131400   -9.5400 -136.3900      37.8        78       132        60
OIR    2025130    131400   -9.5400 -136.4000      37.8        78       130        60
OIR    2025130    131400   -9.5400 -136.4100      38.1        79       128        60
OIR    2025130    131400   -9.5400 -136.4200      38.7        79       128        60
OIR    2025130    131400   -9.5400 -136.4300      39.1        79       129        60
OIR    2025130    131400   -9.5400 -136.4400      39.3        79       130        60
OIR    2025130    131400   -9.5400 -136.4500      39.4        79       132        60
OIR    2025130    131400   -9.5400 -136.4600      39.5        79       134        60
OIR    2025130    131400   -9.5400 -136.4700      39.6        79       135        60
OIR    2025130    131400   -9.5400 -136.4800      39.6        79       137        60
OIR    2025130    131400   -9.5400 -136.4900      39.2        79       137        60
OIR    2025130    131400   -9.5400 -136.5000      39.2        79       132        60
OIR    2025130    131400   -9.5400 -136.5100      39.2        78       129        60
OIR    2025130    131400   -9.5400 -136.5200      39.3        78       126        60
OIR    2025130    131400   -9.5400 -136.5300      39.2        78       129        60
OIR    2025130    131400   -9.5400 -136.5400      38.8        77       132        60
OIR    2025130    131400   -9.5400 -136.5500      37.4        76       135        60
OIR    2025130    131400   -9.5400 -136.5600      34.9        75       138        60
OIR    2025130    131400   -9.5400 -136.5700      29.3        75       138        60
OIR    2025130    131400   -9.5400 -136.5800      28.0        75       137        60
OIR    2025130    131400   -9.5400 -136.5900      27.6        75       134        60
OIR    2025130    131400   -9.5400 -136.6000      27.3        75       132        60
OIR    2025130    131400   -9.5400 -136.6100      27.3        75       130        60
OIR    2025130    131400   -9.5400 -136.6200      27.3        75       129        60
OIR    2025130    131400   -9.5400 -136.6300      27.3        75       128        60
OIR    2025130    131400   -9.5400 -136.6400      27.3        75       128        60
OIR    2025130    131400   -9.5400 -136.6500      27.3        75       128        60
OIR    2025130    131400   -9.5400 -136.6600      27.3        74       126        60
OIR    2025130    131400   -9.5400 -136.6700      27.3        74       125        60
OIR    2025130    131400   -9.5400 -136.6800      27.3        74       124        60
OIR    2025130    131400   -9.5400 -136.6900      27.4        74       124        60
OIR    2025130    131400   -9.5400 -136.7000      27.3        73       124        60
OIR    2025130    131400   -9.5400 -136.7100      27.3        73       124        60
OIR    2025130    131400   -9.5400 -136.7200      27.3        73       123        60
OIR    2025130    131400   -9.5400 -136.7300      27.2        72       122        60
OIR    2025130    131400   -9.5400 -136.7400      27.0        72       121        60
OIR    2025130    131400   -9.5400 -136.7500      26.8        71       116        60
OIR    2025130    131400   -9.5400 -136.7600      26.7        70       114        60
OIR    2025130    131400   -9.5400 -136.7700      26.5        69       112        60
OIR    2025130    131400   -9.5400 -136.7800      26.5        68       111        60
OIR    2025130    131400   -9.5400 -136.7900      26.5        67       109        60
OIR    2025130    131400   -9.5400 -136.8000      26.6        67       107        60
OIR    2025130    131400   -9.5400 -136.8100      26.7        66       105        60
OIR    2025130    131400   -9.5400 -136.8200      26.9        65       105        60
OIR    2025130    131400   -9.5400 -136.8300      27.2        64       107        60
OIR    2025130    131400   -9.5400 -136.8400      27.3        63       108        60
OIR    2025130    131400   -9.5400 -136.8500      27.4        63       109        60
OIR    2025130    131400   -9.5400 -136.8600      27.4        63       109        60
OIR    2025130    131400   -9.5400 -136.8700      27.4        63       109        60
OIR    2025130    131400   -9.5400 -136.8800      27.4        63       110        60
OIR    2025130    131400   -9.5400 -136.8900      27.4        63       111        60
OIR    2025130    131400   -9.5400 -136.9000      27.5        63       110        60
OIR    2025130    131400   -9.5400 -136.9100      27.6        63       109        60
OIR    2025130    131400   -9.5400 -136.9200      27.7        63       108        60
OIR    2025130    131400   -9.5400 -136.9300      27.8        63       108        60
OIR    2025130    131400   -9.5400 -136.9400      27.9        63       109        60
OIR    2025130    131400   -9.5400 -136.9500      28.0        63       109        60
OIR    2025130    131400   -9.5400 -136.9600      28.1        63       109        60
OIR    2025130    131400   -9.5400 -136.9700      28.2        63       109        60
OIR    2025130    131400   -9.5400 -136.9800      28.2        63       110        60
OIR    2025130    131400   -9.5400 -136.9900      28.3        63       109        60
OIR    2025130    131400   -9.5400 -137.0000      28.4        63       109        60
OIR    2025130    131400   -9.5400 -137.0100      28.4        63       110        60
OIR    2025130    131400   -9.5400 -137.0200      28.4        63       112        60
OIR    2025130    131400   -9.5400 -137.0300      28.4        63       113        60
OIR    2025130    131400   -9.5400 -137.0400      28.5        63       114        60
OIR    2025130    131400   -9.5400 -137.0500      28.6        63       115        60
OIR    2025130    131400   -9.5400 -137.0600      28.8        63       113        60
OIR    2025130    131400   -9.5400 -137.0700      29.0        63       110        60
OIR    2025130    131400   -9.5400 -137.0800      29.5        62       109        60
OIR    2025130    131400   -9.5400 -137.0900      29.9        61       108        60
OIR    2025130    131400   -9.5400 -137.1000      30.3        60       109        60
OIR    2025130    131400   -9.5400 -137.1100      30.5        60       109        60
OIR    2025130    131400   -9.5400 -137.1200      30.8        60       109        60
OIR    2025130    131400   -9.5400 -137.1300      31.1        60       109        60
OIR    2025130    131400   -9.5400 -137.1400      31.3        60       109        60
OIR    2025130    131400   -9.5400 -137.1500      31.5        60       109        60
OIR    2025130    131400   -9.5400 -137.1600      31.7        60       109        60
OIR    2025130    131400   -9.5400 -137.1700      31.7        60       110        60
OIR    2025130    131400   -9.5400 -137.1800      31.7        60       112        60
OIR    2025130    131400   -9.5400 -137.1900      31.6        60       112        60
OIR    2025130    131400   -9.5400 -137.2000      31.2        60       111        60
OIR    2025130    131400   -9.5400 -137.2100      30.7        60       109        60
OIR    2025130    131400   -9.5400 -137.2200      30.4        60       107        60
OIR    2025130    131400   -9.5400 -137.2300      30.1        60       105        60
OIR    2025130    131400   -9.5400 -137.2400      29.9        60       104        60
OIR    2025130    131400   -9.5400 -137.2500      29.7        60       104        60
OIR    2025130    131400   -9.5400 -137.2600      29.5        60       103        60
OIR    2025130    131400   -9.5400 -137.2700      29.4        60       103        60
OIR    2025130    131400   -9.5400 -137.2800      29.3        60       103        60
OIR    2025130    131400   -9.5400 -137.2900      29.2        60       103        60
OIR    2025130    131400   -9.5400 -137.3000      29.2        60       103        60
OIR    2025130    131400   -9.5400 -137.3100      29.1        60       103        60
OIR    2025130    131400   -9.5400 -137.3200      29.1        60       103        60
OIR    2025130    131400   -9.5400 -137.3300      29.1        60       103        60
OIR    2025130    131400   -9.5400 -137.3400      29.0        60       103        60
OIR    2025130    131400   -9.5400 -137.3500      29.0        60       103        60
OIR    2025130    131400   -9.5400 -137.3600      29.0        60       103        60
OIR    2025130    131400   -9.5400 -137.3700      29.0        60       103        60
OIR    2025130    131400   -9.5400 -137.3800      29.0        60       103        60
OIR    2025130    131400   -9.5400 -137.3900      28.9        60       103        60
OIR    2025130    131400   -9.5400 -137.4000      28.9        59       103        60
OIR    2025130    131400   -9.5400 -137.4100      28.9        59       103        60
OIR    2025130    131400   -9.5400 -137.4200      28.5        60       103        60
OIR    2025130    131400   -9.5400 -137.4300      26.7        60       103        60
OIR    2025130    131400   -9.5400 -137.4400      25.7        60       103        60
OIR    2025130    131400   -9.5400 -137.4500      24.8        60       103        60
OIR    2025130    131400   -9.5400 -137.4600      23.3        61       103        60
OIR    2025130    131400   -9.5400 -137.4700      22.4        60       103        60
OIR    2025130    131400   -9.5400 -137.4800      21.7        60       103        60
OIR    2025130    131400   -9.5400 -137.4900      20.4        60       103        60
OIR    2025130    131400   -9.5400 -137.5000      19.3        60       103        60
OIR    2025130    131400   -9.5400 -137.5100      18.6        58       103        60
OIR    2025130    131400   -9.5400 -137.5200      18.2        57       103        60
OIR    2025130    131400   -9.5400 -137.5300      17.7        54       103        60
OIR    2025130    131400   -9.5400 -137.5400      16.9        51       103        60
OIR    2025130    131400   -9.5400 -137.5500      15.8        47       103        60
OIR    2025130    131400   -9.5400 -137.5600      14.3        42       103        60
OIR    2025130    131400   -9.5400 -137.5700      12.9        35       103        60
OIR    2025130    131400   -9.5400 -137.5800      11.8        29       103        60
OIR    2025130    131400   -9.5400 -137.5900      11.0        23       103        60
OIR    2025130    131400   -9.5400 -137.6000      10.6        18       103        60
OIR    2025130    131400   -9.5400 -137.6100      10.8        13       103        60
OIR    2025130    131400   -9.5400 -137.6200      11.2         9       103        60
OIR    2025130    131400   -9.5400 -137.6300      12.0         7       103        60
OIR    2025130    131400   -9.5400 -137.6400      12.8         3       103        60
OIR    2025130    131400   -9.5400 -137.6500      14.4       357       103        60
OIR    2025130    131400   -9.5400 -137.6600      16.0       354       103        60
OIR    2025130    131400   -9.5400 -137.6700      18.1       353       103        60
OIR    2025130    131400   -9.5400 -137.6800      19.4       353       103        60
OIR    2025130    131400   -9.5400 -137.6900      20.5       352       103        60
OIR    2025130    131400   -9.5400 -137.7000      21.7       352       103        60
OIR    2025130    131400   -9.5400 -137.7100      22.0       353       103        60
OIR    2025130    131400   -9.5400 -137.7200      22.1       353       103        60
OIR    2025130    131400   -9.5400 -137.7300      22.2       353       103        60
OIR    2025130    131400   -9.5400 -137.7400      22.7       353       103        60
OIR    2025130    131400   -9.5400 -137.7500      24.5       352       103        60
OIR    2025130    131400   -9.5400 -137.7600      25.1       352       103        60
OIR    2025130    131400   -9.5400 -137.7700      25.4       353       103        60
OIR    2025130    131400   -9.5400 -137.7800      25.6       353       103        60
OIR    2025130    131400   -9.5400 -137.7900      25.8       353       103        60
OIR    2025130    131400   -9.5400 -137.8000      26.0       354       103        60
OIR    2025130    131400   -9.5400 -137.8100      26.1       354       103        60
OIR    2025130    131400   -9.5400 -137.8200      26.1       354       103        60
OIR    2025130    131400   -9.5400 -137.8300      26.2       354       103        60
OIR    2025130    131400   -9.5400 -137.8400      26.3       353       103        60
OIR    2025130    131400   -9.5400 -137.8500      26.5       351       103        60
OIR    2025130    131400   -9.5400 -137.8600      26.7       349       103        60
OIR    2025130    131400   -9.5400 -137.8700      26.6       346       103        60
OIR    2025130    131400   -9.5400 -137.8800      26.0       340       103        60
OIR    2025130    131400   -9.5400 -137.8900      24.6       333       103        60
OIR    2025130    131400   -9.5400 -137.9000      23.8       326       103        60
OIR    2025130    131400   -9.5400 -137.9100      23.3       322       103        60
OIR    2025130    131400   -9.5400 -137.9200      23.1       321       103        60
OIR    2025130    131400   -9.5400 -137.9300      23.0       320       104        60
OIR    2025130    131400   -9.5400 -137.9400      22.8       319       108        60
OIR    2025130    131400   -9.5400 -137.9500      22.7       319       112        60
OIR    2025130    131400   -9.5400 -137.9600      22.4       319       113        60
OIR    2025130    131400   -9.5400 -137.9700      22.1       319       114        60
OIR    2025130    131400   -9.5400 -137.9800      21.8       319       115        60
OIR    2025130    131400   -9.5400 -137.9900      21.6       319       115        60
OIR    2025130    131400   -9.5400 -138.0000      21.5       319       115        60
OIR    2025130    131400   -9.5400 -138.0100      21.4       319       116        60
OIR    2025130    131400   -9.5400 -138.0200      21.3       319       120        60
OIR    2025130    131400   -9.5400 -138.0300      21.3       320       122        60
OIR    2025130    131400   -9.5400 -138.0400      21.4       320       122        60
OIR    2025130    131400   -9.5400 -138.0500      21.5       320       120        60
OIR    2025130    131400   -9.5400 -138.0600      21.5       320       117        60
OIR    2025130    131400   -9.5400 -138.0700      21.6       320       119        60
OIR    2025130    131400   -9.5400 -138.0800      21.7       320       119        60
OIR    2025130    131400   -9.5400 -138.0900      21.8       320       121        60
OIR    2025130    131400   -9.5400 -138.1000      22.0       320       123        60
OIR    2025130    131400   -9.5400 -138.1100      22.3       319       124        60
OIR    2025130    131400   -9.5400 -138.1200      22.7       319       125        60
OIR    2025130    131400   -9.5400 -138.1300      23.0       318       126        60
OIR    2025130    131400   -9.5400 -138.1400      23.3       317       128        60
OIR    2025130    131400   -9.5400 -138.1500      23.4       317       131        60
OIR    2025130    131400   -9.5400 -138.1600      23.5       317       134        60
OIR    2025130    131400   -9.5400 -138.1700      23.7       317       138        60
OIR    2025130    131400   -9.5400 -138.1800      23.8       317       145        60
OIR    2025130    131400   -9.5400 -138.2000      23.9       317       148        60
OIR    2025130    131400   -9.5400 -138.2100      23.8       318       144        60
OIR    2025130    131400   -9.5400 -138.2200      23.8       318       138        60
OIR    2025130    131400   -9.5400 -138.2300      23.8       318       136        60
OIR    2025130    131400   -9.5400 -138.2400      23.7       319       135        60
OIR    2025130    131400   -9.5400 -138.2500      23.4       320       136        60
OIR    2025130    131400   -9.5400 -138.2600      23.1       321       138        60
OIR    2025130    131400   -9.5400 -138.2700      23.0       322       138        60
OIR    2025130    131400   -9.5400 -138.2800      22.8       322       138        60
OIR    2025130    131400   -9.5400 -138.2900      22.7       323       140        60
OIR    2025130    131400   -9.5400 -138.3000      22.5       323       143        60
OIR    2025130    131400   -9.5400 -138.3100      22.4       323       142        60
OIR    2025130    131400   -9.5400 -138.3200      22.3       324       141        60
OIR    2025130    131400   -9.5400 -138.3300      22.1       325       140        60
OIR    2025130    131400   -9.5400 -138.3400      21.9       326       138        60
OIR    2025130    131400   -9.5400 -138.3500      21.9       326       136        60
OIR    2025130    131400   -9.5400 -138.3600      21.9       327       136        60
OIR    2025130    131400   -9.5400 -138.3700      21.9       327       137        60
OIR    2025130    131400   -9.5400 -138.3800      21.9       327       139        60
OIR    2025130    131400   -9.5400 -138.3900      21.9       327       140        60
OIR    2025130    131400   -9.5400 -138.4000      21.9       327       137        60
OIR    2025130    131400   -9.5400 -138.4100      22.0       327       135        60
OIR    2025130    131400   -9.5400 -138.4200      22.0       327       132        60
OIR    2025130    131400   -9.5400 -138.4300      22.1       328       129        60
OIR    2025130    131400   -9.5400 -138.4400      22.3       329       125        60
OIR    2025130    131400   -9.5400 -138.4500      22.5       330       123        60
OIR    2025130    131400   -9.5400 -138.4600      22.8       332       121        60
OIR    2025130    131400   -9.5400 -138.4700      23.0       333       122        60
OIR    2025130    131400   -9.5400 -138.4800      23.2       334       123        60
OIR    2025130    131400   -9.5400 -138.4900      23.4       334       123        60
OIR    2025130    131400   -9.5400 -138.5000      23.8       334       123        60
OIR    2025130    131400   -9.5400 -138.5100      24.1       334       123        60
OIR    2025130    131400   -9.5400 -138.5200      24.2       334       125        60
OIR    2025130    131400   -9.5400 -138.5300      24.2       334       128        60
OIR    2025130    131400   -9.5400 -138.5400      24.2       334       133        60
OIR    2025130    131400   -9.5400 -138.5500      24.1       334       141        60
OIR    2025130    131400   -9.5400 -138.5600      24.0       334       147        60
OIR    2025130    131400   -9.5500 -136.1500      38.6        76       146        60
OIR    2025130    131400   -9.5500 -136.1600      39.0        76       141        60
OIR    2025130    131400   -9.5500 -136.1700      39.1        76       137        60
OIR    2025130    131400   -9.5500 -136.1800      39.1        77       134        60
OIR    2025130    131400   -9.5500 -136.1900      39.1        77       131        60
OIR    2025130    131400   -9.5500 -136.2000      39.1        77       129        60
OIR    2025130    131400   -9.5500 -136.2100      39.1        77       128        60
OIR    2025130    131400   -9.5500 -136.2200      39.2        77       130        60
OIR    2025130    131400   -9.5500 -136.2300      39.2        77       132        60
OIR    2025130    131400   -9.5500 -136.2400      39.1        77       133        60
OIR    2025130    131400   -9.5500 -136.2500      39.0        77       133        60
OIR    2025130    131400   -9.5500 -136.2600      39.0        77       130        60
OIR    2025130    131400   -9.5500 -136.2700      39.0        77       130        60
OIR    2025130    131400   -9.5500 -136.2800      38.9        77       131        60
OIR    2025130    131400   -9.5500 -136.2900      38.9        77       131        60
OIR    2025130    131400   -9.5500 -136.3000      38.8        77       131        60
OIR    2025130    131400   -9.5500 -136.3100      38.4        77       131        60
OIR    2025130    131400   -9.5500 -136.3200      38.1        77       131        60
OIR    2025130    131400   -9.5500 -136.3300      38.0        77       133        60
OIR    2025130    131400   -9.5500 -136.3400      38.0        77       135        60
OIR    2025130    131400   -9.5500 -136.3500      37.9        77       141        60
OIR    2025130    131400   -9.5500 -136.3600      37.8        77       142        60
OIR    2025130    131400   -9.5500 -136.3700      37.8        78       137        60
OIR    2025130    131400   -9.5500 -136.3800      37.7        78       134        60
OIR    2025130    131400   -9.5500 -136.3900      37.7        78       132        60
OIR    2025130    131400   -9.5500 -136.4000      37.7        78       130        60
OIR    2025130    131400   -9.5500 -136.4100      37.8        78       128        60
OIR    2025130    131400   -9.5500 -136.4200      38.1        79       128        60
OIR    2025130    131400   -9.5500 -136.4300      38.4        78       128        60
OIR    2025130    131400   -9.5500 -136.4400      38.8        78       129        60
OIR    2025130    131400   -9.5500 -136.4500      39.1        78       131        60
OIR    2025130    131400   -9.5500 -136.4600      39.3        78       133        60
OIR    2025130    131400   -9.5500 -136.4700      39.4        79       135        60
OIR    2025130    131400   -9.5500 -136.4800      39.3        79       136        60
OIR    2025130    131400   -9.5500 -136.4900      38.9        78       135        60
OIR    2025130    131400   -9.5500 -136.5000      38.9        78       132        60
OIR    2025130    131400   -9.5500 -136.5100      39.0        78       129        60
OIR    2025130    131400   -9.5500 -136.5200      39.1        78       126        60
OIR    2025130    131400   -9.5500 -136.5300      39.0        77       129        60
OIR    2025130    131400   -9.5500 -136.5400      38.4        76       132        60
OIR    2025130    131400   -9.5500 -136.5500      37.2        76       134        60
OIR    2025130    131400   -9.5500 -136.5600      36.0        75       136        60
OIR    2025130    131400   -9.5500 -136.5700      31.7        75       137        60
OIR    2025130    131400   -9.5500 -136.5800      29.6        74       137        60
OIR    2025130    131400   -9.5500 -136.5900      28.8        74       135        60
OIR    2025130    131400   -9.5500 -136.6000      28.1        75       133        60
OIR    2025130    131400   -9.5500 -136.6100      27.7        75       132        60
OIR    2025130    131400   -9.5500 -136.6200      27.7        75       131        60
OIR    2025130    131400   -9.5500 -136.6300      27.6        75       130        60
OIR    2025130    131400   -9.5500 -136.6400      27.6        75       130        60
OIR    2025130    131400   -9.5500 -136.6500      27.6        74       129        60
OIR    2025130    131400   -9.5500 -136.6600      27.7        74       127        60
OIR    2025130    131400   -9.5500 -136.6700      27.7        74       125        60
OIR    2025130    131400   -9.5500 -136.6800      27.7        73       125        60
OIR    2025130    131400   -9.5500 -136.6900      27.7        73       125        60
OIR    2025130    131400   -9.5500 -136.7000      27.7        73       125        60
OIR    2025130    131400   -9.5500 -136.7100      27.7        72       124        60
OIR    2025130    131400   -9.5500 -136.7200      27.6        72       124        60
OIR    2025130    131400   -9.5500 -136.7300      27.5        72       122        60
OIR    2025130    131400   -9.5500 -136.7400      27.3        71       121        60
OIR    2025130    131400   -9.5500 -136.7500      27.0        70       117        60
OIR    2025130    131400   -9.5500 -136.7600      26.8        69       114        60
OIR    2025130    131400   -9.5500 -136.7700      26.6        68       113        60
OIR    2025130    131400   -9.5500 -136.7800      26.5        68       111        60
OIR    2025130    131400   -9.5500 -136.7900      26.5        67       109        60
OIR    2025130    131400   -9.5500 -136.8000      26.6        66       107        60
OIR    2025130    131400   -9.5500 -136.8100      26.8        65       105        60
OIR    2025130    131400   -9.5500 -136.8200      27.1        64       104        60
OIR    2025130    131400   -9.5500 -136.8300      27.2        64       105        60
OIR    2025130    131400   -9.5500 -136.8400      27.2        63       107        60
OIR    2025130    131400   -9.5500 -136.8500      27.3        63       107        60
OIR    2025130    131400   -9.5500 -136.8600      27.3        63       107        60
OIR    2025130    131400   -9.5500 -136.8700      27.4        63       108        60
OIR    2025130    131400   -9.5500 -136.8800      27.4        63       110        60
OIR    2025130    131400   -9.5500 -136.8900      27.4        62       112        60
OIR    2025130    131400   -9.5500 -136.9000      27.4        62       111        60
OIR    2025130    131400   -9.5500 -136.9100      27.5        62       110        60
OIR    2025130    131400   -9.5500 -136.9200      27.5        62       109        60
OIR    2025130    131400   -9.5500 -136.9300      27.6        62       108        60
OIR    2025130    131400   -9.5500 -136.9400      27.8        62       109        60
OIR    2025130    131400   -9.5500 -136.9500      27.9        62       109        60
OIR    2025130    131400   -9.5500 -136.9600      28.0        62       108        60
OIR    2025130    131400   -9.5500 -136.9700      28.1        62       109        60
OIR    2025130    131400   -9.5500 -136.9800      28.2        62       109        60
OIR    2025130    131400   -9.5500 -136.9900      28.2        62       110        60
OIR    2025130    131400   -9.5500 -137.0000      28.3        62       110        60
OIR    2025130    131400   -9.5500 -137.0100      28.4        63       110        60
OIR    2025130    131400   -9.5500 -137.0200      28.4        63       111        60
OIR    2025130    131400   -9.5500 -137.0300      28.5        63       112        60
OIR    2025130    131400   -9.5500 -137.0400      28.6        63       114        60
OIR    2025130    131400   -9.5500 -137.0500      28.7        63       115        60
OIR    2025130    131400   -9.5500 -137.0600      29.0        62       114        60
OIR    2025130    131400   -9.5500 -137.0700      29.3        62       113        60
OIR    2025130    131400   -9.5500 -137.0800      29.9        60       111        60
OIR    2025130    131400   -9.5500 -137.0900      30.4        59       109        60
OIR    2025130    131400   -9.5500 -137.1000      30.8        59       109        60
OIR    2025130    131400   -9.5500 -137.1100      30.9        59       108        60
OIR    2025130    131400   -9.5500 -137.1200      31.1        59       108        60
OIR    2025130    131400   -9.5500 -137.1300      31.4        59       108        60
OIR    2025130    131400   -9.5500 -137.1400      31.6        59       108        60
OIR    2025130    131400   -9.5500 -137.1500      31.7        59       108        60
OIR    2025130    131400   -9.5500 -137.1600      31.9        59       108        60
OIR    2025130    131400   -9.5500 -137.1700      32.0        60       109        60
OIR    2025130    131400   -9.5500 -137.1800      32.0        60       111        60
OIR    2025130    131400   -9.5500 -137.1900      31.9        60       111        60
OIR    2025130    131400   -9.5500 -137.2000      31.6        60       111        60
OIR    2025130    131400   -9.5500 -137.2100      31.1        60       108        60
OIR    2025130    131400   -9.5500 -137.2200      30.7        59       105        60
OIR    2025130    131400   -9.5500 -137.2300      30.4        59       104        60
OIR    2025130    131400   -9.5500 -137.2400      30.2        60       104        60
OIR    2025130    131400   -9.5500 -137.2500      30.0        60       104        60
OIR    2025130    131400   -9.5500 -137.2600      29.7        60       103        60
OIR    2025130    131400   -9.5500 -137.2700      29.6        60       103        60
OIR    2025130    131400   -9.5500 -137.2800      29.4        60       103        60
OIR    2025130    131400   -9.5500 -137.2900      29.3        60       103        60
OIR    2025130    131400   -9.5500 -137.3000      29.2        60       103        60
OIR    2025130    131400   -9.5500 -137.3100      29.2        60       103        60
OIR    2025130    131400   -9.5500 -137.3200      29.1        60       103        60
OIR    2025130    131400   -9.5500 -137.3300      29.1        60       103        60
OIR    2025130    131400   -9.5500 -137.3400      29.1        60       103        60
OIR    2025130    131400   -9.5500 -137.3500      29.0        60       103        60
OIR    2025130    131400   -9.5500 -137.3600      29.0        60       103        60
OIR    2025130    131400   -9.5500 -137.3700      29.0        60       103        60
OIR    2025130    131400   -9.5500 -137.3800      29.0        60       103        60
OIR    2025130    131400   -9.5500 -137.3900      29.0        59       103        60
OIR    2025130    131400   -9.5500 -137.4000      28.9        59       103        60
OIR    2025130    131400   -9.5500 -137.4100      28.9        59       103        60
OIR    2025130    131400   -9.5500 -137.4200      28.8        60       103        60
OIR    2025130    131400   -9.5500 -137.4300      28.0        60       103        60
OIR    2025130    131400   -9.5500 -137.4400      27.6        59       103        60
OIR    2025130    131400   -9.5500 -137.4500      27.2        59       103        60
OIR    2025130    131400   -9.5500 -137.4600      26.2        59       103        60
OIR    2025130    131400   -9.5500 -137.4700      24.8        59       103        60
OIR    2025130    131400   -9.5500 -137.4800      24.2        58       103        60
OIR    2025130    131400   -9.5500 -137.4900      23.7        57       103        60
OIR    2025130    131400   -9.5500 -137.5000      23.2        55       103        60
OIR    2025130    131400   -9.5500 -137.5100      22.4        53       103        60
OIR    2025130    131400   -9.5500 -137.5200      21.6        51       103        60
OIR    2025130    131400   -9.5500 -137.5300      20.8        49       103        60
OIR    2025130    131400   -9.5500 -137.5400      20.0        46       103        60
OIR    2025130    131400   -9.5500 -137.5500      19.1        43       103        60
OIR    2025130    131400   -9.5500 -137.5600      18.0        38       103        60
OIR    2025130    131400   -9.5500 -137.5700      16.4        33       103        60
OIR    2025130    131400   -9.5500 -137.5800      14.9        28       103        60
OIR    2025130    131400   -9.5500 -137.5900      13.9        24       103        60
OIR    2025130    131400   -9.5500 -137.6000      13.1        21       103        60
OIR    2025130    131400   -9.5500 -137.6100      12.5        14       103        60
OIR    2025130    131400   -9.5500 -137.6200      12.7        11       103        60
OIR    2025130    131400   -9.5500 -137.6300      13.2         9       103        60
OIR    2025130    131400   -9.5500 -137.6400      13.9         5       103        60
OIR    2025130    131400   -9.5500 -137.6500      15.3       358       103        60
OIR    2025130    131400   -9.5500 -137.6600      16.5       356       103        60
OIR    2025130    131400   -9.5500 -137.6700      17.8       355       103        60
OIR    2025130    131400   -9.5500 -137.6800      19.1       354       103        60
OIR    2025130    131400   -9.5500 -137.6900      20.9       353       103        60
OIR    2025130    131400   -9.5500 -137.7000      21.5       352       103        60
OIR    2025130    131400   -9.5500 -137.7100      21.8       353       103        60
OIR    2025130    131400   -9.5500 -137.7200      21.9       353       103        60
OIR    2025130    131400   -9.5500 -137.7300      22.4       353       103        60
OIR    2025130    131400   -9.5500 -137.7400      24.6       351       103        60
OIR    2025130    131400   -9.5500 -137.7500      25.2       352       103        60
OIR    2025130    131400   -9.5500 -137.7600      25.4       352       103        60
OIR    2025130    131400   -9.5500 -137.7700      25.6       352       103        60
OIR    2025130    131400   -9.5500 -137.7800      25.8       353       103        60
OIR    2025130    131400   -9.5500 -137.7900      25.9       353       103        60
OIR    2025130    131400   -9.5500 -137.8000      26.1       354       103        60
OIR    2025130    131400   -9.5500 -137.8100      26.3       354       103        60
OIR    2025130    131400   -9.5500 -137.8200      26.4       354       103        60
OIR    2025130    131400   -9.5500 -137.8300      26.5       354       103        60
OIR    2025130    131400   -9.5500 -137.8400      26.7       353       103        60
OIR    2025130    131400   -9.5500 -137.8500      27.1       352       103        60
OIR    2025130    131400   -9.5500 -137.8600      27.3       350       103        60
OIR    2025130    131400   -9.5500 -137.8700      27.3       348       103        60
OIR    2025130    131400   -9.5500 -137.8800      27.0       345       103        60
OIR    2025130    131400   -9.5500 -137.8900      26.0       339       103        60
OIR    2025130    131400   -9.5500 -137.9000      24.9       330       103        60
OIR    2025130    131400   -9.5500 -137.9100      23.9       324       103        60
OIR    2025130    131400   -9.5500 -137.9200      23.4       322       103        60
OIR    2025130    131400   -9.5500 -137.9300      23.2       321       104        60
OIR    2025130    131400   -9.5500 -137.9400      23.1       320       108        60
OIR    2025130    131400   -9.5500 -137.9500      22.9       320       112        60
OIR    2025130    131400   -9.5500 -137.9600      22.7       320       114        60
OIR    2025130    131400   -9.5500 -137.9700      22.4       320       115        60
OIR    2025130    131400   -9.5500 -137.9800      22.2       320       116        60
OIR    2025130    131400   -9.5500 -137.9900      22.0       320       116        60
OIR    2025130    131400   -9.5500 -138.0000      21.8       320       116        60
OIR    2025130    131400   -9.5500 -138.0100      21.7       320       116        60
OIR    2025130    131400   -9.5500 -138.0200      21.7       320       120        60
OIR    2025130    131400   -9.5500 -138.0300      21.7       320       122        60
OIR    2025130    131400   -9.5500 -138.0400      21.7       320       123        60
OIR    2025130    131400   -9.5500 -138.0500      21.8       320       122        60
OIR    2025130    131400   -9.5500 -138.0600      21.8       320       120        60
OIR    2025130    131400   -9.5500 -138.0700      21.8       320       120        60
OIR    2025130    131400   -9.5500 -138.0800      21.9       320       121        60
OIR    2025130    131400   -9.5500 -138.0900      22.0       320       121        60
OIR    2025130    131400   -9.5500 -138.1000      22.2       320       122        60
OIR    2025130    131400   -9.5500 -138.1100      22.5       319       124        60
OIR    2025130    131400   -9.5500 -138.1200      22.8       319       125        60
OIR    2025130    131400   -9.5500 -138.1300      23.1       318       126        60
OIR    2025130    131400   -9.5500 -138.1400      23.3       318       128        60
OIR    2025130    131400   -9.5500 -138.1500      23.5       317       131        60
OIR    2025130    131400   -9.5500 -138.1600      23.6       317       136        60
OIR    2025130    131400   -9.5500 -138.1700      23.7       317       141        60
OIR    2025130    131400   -9.5500 -138.1800      23.8       317       145        60
OIR    2025130    131400   -9.5500 -138.1900      23.9       317       149        60
OIR    2025130    131400   -9.5500 -138.2000      23.9       318       147        60
OIR    2025130    131400   -9.5500 -138.2100      23.9       318       144        60
OIR    2025130    131400   -9.5500 -138.2200      23.8       318       139        60
OIR    2025130    131400   -9.5500 -138.2300      23.8       318       137        60
OIR    2025130    131400   -9.5500 -138.2400      23.6       319       136        60
OIR    2025130    131400   -9.5500 -138.2500      23.4       320       136        60
OIR    2025130    131400   -9.5500 -138.2600      23.2       322       138        60
OIR    2025130    131400   -9.5500 -138.2700      23.1       322       138        60
OIR    2025130    131400   -9.5500 -138.2800      22.9       322       138        60
OIR    2025130    131400   -9.5500 -138.2900      22.8       323       139        60
OIR    2025130    131400   -9.5500 -138.3000      22.6       323       140        60
OIR    2025130    131400   -9.5500 -138.3100      22.5       324       140        60
OIR    2025130    131400   -9.5500 -138.3200      22.3       324       141        60
OIR    2025130    131400   -9.5500 -138.3300      22.1       325       142        60
OIR    2025130    131400   -9.5500 -138.3400      21.9       326       142        60
OIR    2025130    131400   -9.5500 -138.3500      21.9       327       139        60
OIR    2025130    131400   -9.5500 -138.3600      21.9       327       139        60
OIR    2025130    131400   -9.5500 -138.3700      21.9       327       139        60
OIR    2025130    131400   -9.5500 -138.3800      21.9       327       141        60
OIR    2025130    131400   -9.5500 -138.3900      21.9       327       142        60
OIR    2025130    131400   -9.5500 -138.4000      21.9       327       140        60
OIR    2025130    131400   -9.5500 -138.4100      21.9       327       138        60
OIR    2025130    131400   -9.5500 -138.4200      22.0       328       135        60
OIR    2025130    131400   -9.5500 -138.4300      22.0       328       132        60
OIR    2025130    131400   -9.5500 -138.4400      22.1       329       128        60
OIR    2025130    131400   -9.5500 -138.4500      22.3       330       126        60
OIR    2025130    131400   -9.5500 -138.4600      22.4       332       124        60
OIR    2025130    131400   -9.5500 -138.4700      22.6       333       124        60
OIR    2025130    131400   -9.5500 -138.4800      22.8       334       125        60
OIR    2025130    131400   -9.5500 -138.4900      23.1       334       124        60
OIR    2025130    131400   -9.5500 -138.5000      23.7       334       124        60
OIR    2025130    131400   -9.5500 -138.5100      24.1       334       125        60
OIR    2025130    131400   -9.5500 -138.5200      24.2       334       127        60
OIR    2025130    131400   -9.5500 -138.5300      24.2       334       132        60
OIR    2025130    131400   -9.5500 -138.5400      24.2       334       138        60
OIR    2025130    131400   -9.5600 -136.1500      38.1        75       142        60
OIR    2025130    131400   -9.5600 -136.1600      39.1        76       137        60
OIR    2025130    131400   -9.5600 -136.1700      39.1        76       131        60
OIR    2025130    131400   -9.5600 -136.1800      39.1        76       128        60
OIR    2025130    131400   -9.5600 -136.1900      39.1        77       125        60
OIR    2025130    131400   -9.5600 -136.2000      39.2        77       123        60
OIR    2025130    131400   -9.5600 -136.2100      39.2        77       123        60
OIR    2025130    131400   -9.5600 -136.2200      39.3        77       124        60
OIR    2025130    131400   -9.5600 -136.2300      39.3        77       126        60
OIR    2025130    131400   -9.5600 -136.2400      39.3        77       128        60
OIR    2025130    131400   -9.5600 -136.2500      39.0        77       130        60
OIR    2025130    131400   -9.5600 -136.2600      39.0        77       130        60
OIR    2025130    131400   -9.5600 -136.2700      39.0        77       131        60
OIR    2025130    131400   -9.5600 -136.2800      38.9        77       132        60
OIR    2025130    131400   -9.5600 -136.2900      38.8        77       132        60
OIR    2025130    131400   -9.5600 -136.3000      38.7        77       132        60
OIR    2025130    131400   -9.5600 -136.3100      38.3        77       132        60
OIR    2025130    131400   -9.5600 -136.3200      38.1        77       131        60
OIR    2025130    131400   -9.5600 -136.3300      38.0        77       132        60
OIR    2025130    131400   -9.5600 -136.3400      38.0        77       133        60
OIR    2025130    131400   -9.5600 -136.3500      37.9        77       138        60
OIR    2025130    131400   -9.5600 -136.3600      37.8        77       140        60
OIR    2025130    131400   -9.5600 -136.3700      37.8        78       136        60
OIR    2025130    131400   -9.5600 -136.3800      37.7        78       134        60
OIR    2025130    131400   -9.5600 -136.3900      37.7        78       133        60
OIR    2025130    131400   -9.5600 -136.4000      37.7        78       130        60
OIR    2025130    131400   -9.5600 -136.4100      37.7        78       128        60
OIR    2025130    131400   -9.5600 -136.4200      37.8        78       127        60
OIR    2025130    131400   -9.5600 -136.4300      38.0        78       127        60
OIR    2025130    131400   -9.5600 -136.4400      38.3        78       129        60
OIR    2025130    131400   -9.5600 -136.4500      38.4        78       130        60
OIR    2025130    131400   -9.5600 -136.4600      38.5        78       133        60
OIR    2025130    131400   -9.5600 -136.4700      38.5        78       134        60
OIR    2025130    131400   -9.5600 -136.4800      38.5        78       133        60
OIR    2025130    131400   -9.5600 -136.4900      38.6        78       133        60
OIR    2025130    131400   -9.5600 -136.5000      38.6        78       132        60
OIR    2025130    131400   -9.5600 -136.5100      38.7        77       130        60
OIR    2025130    131400   -9.5600 -136.5200      38.8        77       126        60
OIR    2025130    131400   -9.5600 -136.5300      38.6        76       129        60
OIR    2025130    131400   -9.5600 -136.5400      37.9        76       132        60
OIR    2025130    131400   -9.5600 -136.5500      37.2        75       132        60
OIR    2025130    131400   -9.5600 -136.5600      36.6        74       133        60
OIR    2025130    131400   -9.5600 -136.5700      34.8        74       136        60
OIR    2025130    131400   -9.5600 -136.5800      32.6        74       137        60
OIR    2025130    131400   -9.5600 -136.5900      31.2        74       135        60
OIR    2025130    131400   -9.5600 -136.6000      30.0        74       134        60
OIR    2025130    131400   -9.5600 -136.6100      29.2        74       134        60
OIR    2025130    131400   -9.5600 -136.6200      28.5        74       133        60
OIR    2025130    131400   -9.5600 -136.6300      28.3        75       132        60
OIR    2025130    131400   -9.5600 -136.6400      28.3        74       131        60
OIR    2025130    131400   -9.5600 -136.6500      28.2        74       130        60
OIR    2025130    131400   -9.5600 -136.6600      28.2        73       128        60
OIR    2025130    131400   -9.5600 -136.6700      28.1        73       126        60
OIR    2025130    131400   -9.5600 -136.6800      28.1        73       125        60
OIR    2025130    131400   -9.5600 -136.6900      28.1        73       125        60
OIR    2025130    131400   -9.5600 -136.7000      28.0        72       125        60
OIR    2025130    131400   -9.5600 -136.7100      28.0        72       125        60
OIR    2025130    131400   -9.5600 -136.7200      27.9        72       124        60
OIR    2025130    131400   -9.5600 -136.7300      27.8        71       122        60
OIR    2025130    131400   -9.5600 -136.7400      27.6        71       121        60
OIR    2025130    131400   -9.5600 -136.7500      27.2        70       117        60
OIR    2025130    131400   -9.5600 -136.7600      26.8        69       115        60
OIR    2025130    131400   -9.5600 -136.7700      26.6        68       113        60
OIR    2025130    131400   -9.5600 -136.7800      26.5        67       112        60
OIR    2025130    131400   -9.5600 -136.7900      26.5        67       108        60
OIR    2025130    131400   -9.5600 -136.8000      26.6        66       105        60
OIR    2025130    131400   -9.5600 -136.8100      26.9        65       104        60
OIR    2025130    131400   -9.5600 -136.8200      27.1        64       104        60
OIR    2025130    131400   -9.5600 -136.8300      27.2        63       104        60
OIR    2025130    131400   -9.5600 -136.8400      27.2        63       104        60
OIR    2025130    131400   -9.5600 -136.8500      27.3        63       104        60
OIR    2025130    131400   -9.5600 -136.8600      27.3        62       104        60
OIR    2025130    131400   -9.5600 -136.8700      27.3        62       105        60
OIR    2025130    131400   -9.5600 -136.8800      27.3        62       109        60
OIR    2025130    131400   -9.5600 -136.8900      27.3        62       112        60
OIR    2025130    131400   -9.5600 -136.9000      27.3        62       112        60
OIR    2025130    131400   -9.5600 -136.9100      27.4        62       111        60
OIR    2025130    131400   -9.5600 -136.9200      27.4        62       109        60
OIR    2025130    131400   -9.5600 -136.9300      27.5        62       108        60
OIR    2025130    131400   -9.5600 -136.9400      27.6        62       108        60
OIR    2025130    131400   -9.5600 -136.9500      27.7        62       108        60
OIR    2025130    131400   -9.5600 -136.9600      27.8        62       107        60
OIR    2025130    131400   -9.5600 -136.9700      27.9        62       108        60
OIR    2025130    131400   -9.5600 -136.9800      28.0        62       108        60
OIR    2025130    131400   -9.5600 -136.9900      28.2        62       109        60
OIR    2025130    131400   -9.5600 -137.0000      28.3        62       110        60
OIR    2025130    131400   -9.5600 -137.0100      28.4        62       109        60
OIR    2025130    131400   -9.5600 -137.0200      28.5        62       109        60
OIR    2025130    131400   -9.5600 -137.0300      28.9        61       111        60
OIR    2025130    131400   -9.5600 -137.0400      29.5        59       113        60
OIR    2025130    131400   -9.5600 -137.0500      30.3        58       113        60
OIR    2025130    131400   -9.5600 -137.0600      30.9        57       115        60
OIR    2025130    131400   -9.5600 -137.0700      31.1        56       116        60
OIR    2025130    131400   -9.5600 -137.0800      31.1        56       113        60
OIR    2025130    131400   -9.5600 -137.0900      31.1        57       110        60
OIR    2025130    131400   -9.5600 -137.1000      31.2        57       108        60
OIR    2025130    131400   -9.5600 -137.1100      31.3        58       107        60
OIR    2025130    131400   -9.5600 -137.1200      31.4        58       107        60
OIR    2025130    131400   -9.5600 -137.1300      31.6        58       107        60
OIR    2025130    131400   -9.5600 -137.1400      31.8        58       107        60
OIR    2025130    131400   -9.5600 -137.1500      32.0        59       107        60
OIR    2025130    131400   -9.5600 -137.1600      32.1        59       107        60
OIR    2025130    131400   -9.5600 -137.1700      32.2        59       108        60
OIR    2025130    131400   -9.5600 -137.1800      32.3        59       110        60
OIR    2025130    131400   -9.5600 -137.1900      32.2        60       110        60
OIR    2025130    131400   -9.5600 -137.2000      32.0        60       109        60
OIR    2025130    131400   -9.5600 -137.2100      31.5        59       105        60
OIR    2025130    131400   -9.5600 -137.2200      31.0        59       104        60
OIR    2025130    131400   -9.5600 -137.2300      30.7        59       104        60
OIR    2025130    131400   -9.5600 -137.2400      30.4        59       103        60
OIR    2025130    131400   -9.5600 -137.2500      30.2        59       103        60
OIR    2025130    131400   -9.5600 -137.2600      29.9        59       103        60
OIR    2025130    131400   -9.5600 -137.2700      29.7        59       103        60
OIR    2025130    131400   -9.5600 -137.2800      29.6        60       103        60
OIR    2025130    131400   -9.5600 -137.2900      29.4        60       103        60
OIR    2025130    131400   -9.5600 -137.3000      29.3        60       103        60
OIR    2025130    131400   -9.5600 -137.3100      29.2        60       103        60
OIR    2025130    131400   -9.5600 -137.3200      29.1        60       103        60
OIR    2025130    131400   -9.5600 -137.3300      29.1        60       103        60
OIR    2025130    131400   -9.5600 -137.3400      29.1        60       103        60
OIR    2025130    131400   -9.5600 -137.3500      29.1        60       103        60
OIR    2025130    131400   -9.5600 -137.3600      29.0        60       103        60
OIR    2025130    131400   -9.5600 -137.3700      29.0        59       103        60
OIR    2025130    131400   -9.5600 -137.3800      29.0        59       103        60
OIR    2025130    131400   -9.5600 -137.3900      29.0        59       103        60
OIR    2025130    131400   -9.5600 -137.4000      29.0        59       103        60
OIR    2025130    131400   -9.5600 -137.4100      28.9        59       103        60
OIR    2025130    131400   -9.5600 -137.4200      28.9        59       103        60
OIR    2025130    131400   -9.5600 -137.4300      28.6        59       103        60
OIR    2025130    131400   -9.5600 -137.4400      28.5        59       103        60
OIR    2025130    131400   -9.5600 -137.4500      28.3        59       103        60
OIR    2025130    131400   -9.5600 -137.4600      28.2        59       103        60
OIR    2025130    131400   -9.5600 -137.4700      27.4        59       103        60
OIR    2025130    131400   -9.5600 -137.4800      26.5        58       103        60
OIR    2025130    131400   -9.5600 -137.4900      26.0        56       103        60
OIR    2025130    131400   -9.5600 -137.5000      25.4        54       103        60
OIR    2025130    131400   -9.5600 -137.5100      24.6        51       103        60
OIR    2025130    131400   -9.5600 -137.5200      23.9        48       103        60
OIR    2025130    131400   -9.5600 -137.5300      23.3        45       103        60
OIR    2025130    131400   -9.5600 -137.5400      22.6        42       103        60
OIR    2025130    131400   -9.5600 -137.5500      21.8        39       103        60
OIR    2025130    131400   -9.5600 -137.5600      21.1        35       103        60
OIR    2025130    131400   -9.5600 -137.5700      20.0        32       103        60
OIR    2025130    131400   -9.5600 -137.5800      18.2        28       103        60
OIR    2025130    131400   -9.5600 -137.5900      16.8        24       103        60
OIR    2025130    131400   -9.5600 -137.6000      16.0        22       103        60
OIR    2025130    131400   -9.5600 -137.6100      15.2        17       103        60
OIR    2025130    131400   -9.5600 -137.6200      14.7        14       103        60
OIR    2025130    131400   -9.5600 -137.6300      14.7        12       103        60
OIR    2025130    131400   -9.5600 -137.6400      15.0         8       103        60
OIR    2025130    131400   -9.5600 -137.6500      16.1         1       103        60
OIR    2025130    131400   -9.5600 -137.6600      16.8       359       103        60
OIR    2025130    131400   -9.5600 -137.6700      17.7       357       103        60
OIR    2025130    131400   -9.5600 -137.6800      18.8       356       103        60
OIR    2025130    131400   -9.5600 -137.6900      20.4       353       103        60
OIR    2025130    131400   -9.5600 -137.7000      21.1       353       103        60
OIR    2025130    131400   -9.5600 -137.7100      21.5       353       103        60
OIR    2025130    131400   -9.5600 -137.7200      22.0       353       103        60
OIR    2025130    131400   -9.5600 -137.7300      24.3       351       103        60
OIR    2025130    131400   -9.5600 -137.7400      24.9       351       103        60
OIR    2025130    131400   -9.5600 -137.7500      25.3       352       103        60
OIR    2025130    131400   -9.5600 -137.7600      25.5       352       103        60
OIR    2025130    131400   -9.5600 -137.7700      25.6       352       103        60
OIR    2025130    131400   -9.5600 -137.7800      25.8       352       103        60
OIR    2025130    131400   -9.5600 -137.7900      25.9       353       103        60
OIR    2025130    131400   -9.5600 -137.8000      26.1       353       103        60
OIR    2025130    131400   -9.5600 -137.8100      26.3       354       103        60
OIR    2025130    131400   -9.5600 -137.8200      26.5       354       103        60
OIR    2025130    131400   -9.5600 -137.8300      26.7       354       103        60
OIR    2025130    131400   -9.5600 -137.8400      27.1       354       103        60
OIR    2025130    131400   -9.5600 -137.8500      27.6       353       103        60
OIR    2025130    131400   -9.5600 -137.8600      27.9       351       103        60
OIR    2025130    131400   -9.5600 -137.8700      27.8       350       103        60
OIR    2025130    131400   -9.5600 -137.8800      27.6       348       103        60
OIR    2025130    131400   -9.5600 -137.8900      27.0       343       103        60
OIR    2025130    131400   -9.5600 -137.9000      25.7       335       103        60
OIR    2025130    131400   -9.5600 -137.9100      24.3       327       103        60
OIR    2025130    131400   -9.5600 -137.9200      23.6       323       103        60
OIR    2025130    131400   -9.5600 -137.9300      23.4       321       103        60
OIR    2025130    131400   -9.5600 -137.9400      23.2       321       107        60
OIR    2025130    131400   -9.5600 -137.9500      23.1       320       112        60
OIR    2025130    131400   -9.5600 -137.9600      22.9       320       114        60
OIR    2025130    131400   -9.5600 -137.9700      22.7       320       116        60
OIR    2025130    131400   -9.5600 -137.9800      22.4       321       116        60
OIR    2025130    131400   -9.5600 -137.9900      22.3       321       116        60
OIR    2025130    131400   -9.5600 -138.0000      22.1       321       116        60
OIR    2025130    131400   -9.5600 -138.0100      22.0       321       117        60
OIR    2025130    131400   -9.5600 -138.0200      22.0       321       120        60
OIR    2025130    131400   -9.5600 -138.0300      22.0       321       122        60
OIR    2025130    131400   -9.5600 -138.0400      22.0       321       124        60
OIR    2025130    131400   -9.5600 -138.0500      22.1       321       123        60
OIR    2025130    131400   -9.5600 -138.0600      22.1       321       122        60
OIR    2025130    131400   -9.5600 -138.0700      22.2       320       122        60
OIR    2025130    131400   -9.5600 -138.0800      22.2       320       122        60
OIR    2025130    131400   -9.5600 -138.0900      22.3       320       122        60
OIR    2025130    131400   -9.5600 -138.1000      22.5       320       123        60
OIR    2025130    131400   -9.5600 -138.1100      22.7       320       124        60
OIR    2025130    131400   -9.5600 -138.1200      22.9       319       125        60
OIR    2025130    131400   -9.5600 -138.1300      23.1       319       126        60
OIR    2025130    131400   -9.5600 -138.1400      23.3       318       128        60
OIR    2025130    131400   -9.5600 -138.1500      23.4       318       132        60
OIR    2025130    131400   -9.5600 -138.1600      23.5       318       138        60
OIR    2025130    131400   -9.5600 -138.1700      23.7       318       143        60
OIR    2025130    131400   -9.5600 -138.1800      23.8       318       145        60
OIR    2025130    131400   -9.5600 -138.1900      23.9       318       146        60
OIR    2025130    131400   -9.5600 -138.2000      23.9       318       145        60
OIR    2025130    131400   -9.5600 -138.2100      23.9       318       143        60
OIR    2025130    131400   -9.5600 -138.2200      23.8       318       140        60
OIR    2025130    131400   -9.5600 -138.2300      23.8       319       138        60
OIR    2025130    131400   -9.5600 -138.2400      23.6       320       137        60
OIR    2025130    131400   -9.5600 -138.2500      23.4       321       137        60
OIR    2025130    131400   -9.5600 -138.2600      23.2       322       138        60
OIR    2025130    131400   -9.5600 -138.2700      23.1       322       138        60
OIR    2025130    131400   -9.5600 -138.2800      23.0       323       138        60
OIR    2025130    131400   -9.5600 -138.2900      22.9       323       138        60
OIR    2025130    131400   -9.5600 -138.3000      22.7       324       137        60
OIR    2025130    131400   -9.5600 -138.3100      22.6       324       138        60
OIR    2025130    131400   -9.5600 -138.3200      22.5       325       140        60
OIR    2025130    131400   -9.5600 -138.3300      22.3       326       144        60
OIR    2025130    131400   -9.5600 -138.3400      22.1       327       144        60
OIR    2025130    131400   -9.5600 -138.3500      22.0       327       142        60
OIR    2025130    131400   -9.5600 -138.3600      22.0       327       142        60
OIR    2025130    131400   -9.5600 -138.3700      22.0       327       141        60
OIR    2025130    131400   -9.5600 -138.3800      21.9       327       142        60
OIR    2025130    131400   -9.5600 -138.3900      21.9       327       143        60
OIR    2025130    131400   -9.5600 -138.4000      21.9       327       142        60
OIR    2025130    131400   -9.5600 -138.4100      21.9       328       140        60
OIR    2025130    131400   -9.5600 -138.4200      21.9       328       138        60
OIR    2025130    131400   -9.5600 -138.4300      21.9       329       135        60
OIR    2025130    131400   -9.5600 -138.4400      21.9       330       131        60
OIR    2025130    131400   -9.5600 -138.4500      22.0       330       129        60
OIR    2025130    131400   -9.5600 -138.4600      22.1       332       127        60
OIR    2025130    131400   -9.5600 -138.4700      22.1       333       127        60
OIR    2025130    131400   -9.5600 -138.4800      22.2       334       127        60
OIR    2025130    131400   -9.5600 -138.4900      22.4       334       126        60
OIR    2025130    131400   -9.5600 -138.5000      23.0       334       126        60
OIR    2025130    131400   -9.5600 -138.5100      23.8       334       127        60
OIR    2025130    131400   -9.5600 -138.5200      24.2       334       131        60
OIR    2025130    131400   -9.5600 -138.5300      24.2       334       136        60
OIR    2025130    131400   -9.5600 -138.5400      24.2       333       144        60
OIR    2025130    131400   -9.5700 -136.1500      37.7        74       139        60
OIR    2025130    131400   -9.5700 -136.1600      39.1        76       134        60
OIR    2025130    131400   -9.5700 -136.1700      39.1        76       129        60
OIR    2025130    131400   -9.5700 -136.1800      39.2        76       126        60
OIR    2025130    131400   -9.5700 -136.1900      39.3        76       124        60
OIR    2025130    131400   -9.5700 -136.2000      39.3        77       122        60
OIR    2025130    131400   -9.5700 -136.2100      39.4        77       121        60
OIR    2025130    131400   -9.5700 -136.2200      39.5        77       124        60
OIR    2025130    131400   -9.5700 -136.2300      39.6        77       126        60
OIR    2025130    131400   -9.5700 -136.2400      39.6        77       129        60
OIR    2025130    131400   -9.5700 -136.2500      39.2        77       131        60
OIR    2025130    131400   -9.5700 -136.2600      39.0        77       133        60
OIR    2025130    131400   -9.5700 -136.2700      38.9        77       134        60
OIR    2025130    131400   -9.5700 -136.2800      38.9        77       135        60
OIR    2025130    131400   -9.5700 -136.2900      38.8        77       134        60
OIR    2025130    131400   -9.5700 -136.3000      38.6        77       133        60
OIR    2025130    131400   -9.5700 -136.3100      38.3        77       133        60
OIR    2025130    131400   -9.5700 -136.3200      38.1        77       133        60
OIR    2025130    131400   -9.5700 -136.3300      38.0        77       133        60
OIR    2025130    131400   -9.5700 -136.3400      38.0        77       134        60
OIR    2025130    131400   -9.5700 -136.3500      37.9        77       139        60
OIR    2025130    131400   -9.5700 -136.3600      37.9        77       140        60
OIR    2025130    131400   -9.5700 -136.3700      37.8        78       136        60
OIR    2025130    131400   -9.5700 -136.3800      37.7        78       135        60
OIR    2025130    131400   -9.5700 -136.3900      37.7        78       134        60
OIR    2025130    131400   -9.5700 -136.4000      37.7        78       133        60
OIR    2025130    131400   -9.5700 -136.4100      37.7        78       131        60
OIR    2025130    131400   -9.5700 -136.4200      37.7        78       129        60
OIR    2025130    131400   -9.5700 -136.4300      37.8        78       129        60
OIR    2025130    131400   -9.5700 -136.4400      38.0        78       131        60
OIR    2025130    131400   -9.5700 -136.4500      38.0        77       133        60
OIR    2025130    131400   -9.5700 -136.4600      37.8        77       136        60
OIR    2025130    131400   -9.5700 -136.4700      37.4        77       136        60
OIR    2025130    131400   -9.5700 -136.4800      37.5        77       133        60
OIR    2025130    131400   -9.5700 -136.4900      37.7        77       132        60
OIR    2025130    131400   -9.5700 -136.5000      37.9        76       131        60
OIR    2025130    131400   -9.5700 -136.5100      38.1        76       129        60
OIR    2025130    131400   -9.5700 -136.5200      38.1        76       127        60
OIR    2025130    131400   -9.5700 -136.5300      37.8        75       130        60
OIR    2025130    131400   -9.5700 -136.5400      37.5        75       132        60
OIR    2025130    131400   -9.5700 -136.5500      37.1        74       133        60
OIR    2025130    131400   -9.5700 -136.5600      36.6        74       133        60
OIR    2025130    131400   -9.5700 -136.5700      35.9        73       136        60
OIR    2025130    131400   -9.5700 -136.5800      35.0        73       137        60
OIR    2025130    131400   -9.5700 -136.5900      33.8        73       136        60
OIR    2025130    131400   -9.5700 -136.6000      32.7        73       136        60
OIR    2025130    131400   -9.5700 -136.6100      31.1        73       136        60
OIR    2025130    131400   -9.5700 -136.6200      29.5        74       135        60
OIR    2025130    131400   -9.5700 -136.6300      29.0        74       133        60
OIR    2025130    131400   -9.5700 -136.6400      29.1        74       131        60
OIR    2025130    131400   -9.5700 -136.6500      28.8        73       130        60
OIR    2025130    131400   -9.5700 -136.6600      28.6        73       128        60
OIR    2025130    131400   -9.5700 -136.6700      28.5        73       126        60
OIR    2025130    131400   -9.5700 -136.6800      28.4        73       126        60
OIR    2025130    131400   -9.5700 -136.6900      28.3        72       125        60
OIR    2025130    131400   -9.5700 -136.7000      28.3        72       125        60
OIR    2025130    131400   -9.5700 -136.7100      28.2        72       124        60
OIR    2025130    131400   -9.5700 -136.7200      28.2        71       124        60
OIR    2025130    131400   -9.5700 -136.7300      28.0        71       123        60
OIR    2025130    131400   -9.5700 -136.7400      27.8        70       121        60
OIR    2025130    131400   -9.5700 -136.7500      27.4        70       119        60
OIR    2025130    131400   -9.5700 -136.7600      26.8        68       116        60
OIR    2025130    131400   -9.5700 -136.7700      26.5        67       115        60
OIR    2025130    131400   -9.5700 -136.7800      26.4        67       112        60
OIR    2025130    131400   -9.5700 -136.7900      26.4        67       109        60
OIR    2025130    131400   -9.5700 -136.8000      26.6        66       107        60
OIR    2025130    131400   -9.5700 -136.8100      26.9        64       105        60
OIR    2025130    131400   -9.5700 -136.8200      27.0        64       104        60
OIR    2025130    131400   -9.5700 -136.8300      27.1        63       104        60
OIR    2025130    131400   -9.5700 -136.8400      27.2        63       104        60
OIR    2025130    131400   -9.5700 -136.8500      27.2        62       104        60
OIR    2025130    131400   -9.5700 -136.8600      27.3        62       104        60
OIR    2025130    131400   -9.5700 -136.8700      27.2        62       104        60
OIR    2025130    131400   -9.5700 -136.8800      27.3        62       107        60
OIR    2025130    131400   -9.5700 -136.8900      27.2        62       110        60
OIR    2025130    131400   -9.5700 -136.9000      27.2        61       111        60
OIR    2025130    131400   -9.5700 -136.9100      27.2        61       111        60
OIR    2025130    131400   -9.5700 -136.9200      27.3        61       110        60
OIR    2025130    131400   -9.5700 -136.9300      27.4        61       109        60
OIR    2025130    131400   -9.5700 -136.9400      27.5        61       108        60
OIR    2025130    131400   -9.5700 -136.9500      27.6        61       108        60
OIR    2025130    131400   -9.5700 -136.9600      27.7        61       108        60
OIR    2025130    131400   -9.5700 -136.9700      27.8        61       108        60
OIR    2025130    131400   -9.5700 -136.9800      28.0        61       108        60
OIR    2025130    131400   -9.5700 -136.9900      28.1        61       109        60
OIR    2025130    131400   -9.5700 -137.0000      28.3        61       110        60
OIR    2025130    131400   -9.5700 -137.0100      28.4        61       109        60
OIR    2025130    131400   -9.5700 -137.0200      28.7        60       110        60
OIR    2025130    131400   -9.5700 -137.0300      29.3        59       111        60
OIR    2025130    131400   -9.5700 -137.0400      30.1        57       111        60
OIR    2025130    131400   -9.5700 -137.0500      30.7        56       111        60
OIR    2025130    131400   -9.5700 -137.0600      31.1        56       112        60
OIR    2025130    131400   -9.5700 -137.0700      31.2        56       113        60
OIR    2025130    131400   -9.5700 -137.0800      31.3        56       111        60
OIR    2025130    131400   -9.5700 -137.0900      31.4        56       110        60
OIR    2025130    131400   -9.5700 -137.1000      31.5        56       108        60
OIR    2025130    131400   -9.5700 -137.1100      31.6        57       107        60
OIR    2025130    131400   -9.5700 -137.1200      31.7        57       109        60
OIR    2025130    131400   -9.5700 -137.1300      31.7        57       109        60
OIR    2025130    131400   -9.5700 -137.1400      31.9        58       107        60
OIR    2025130    131400   -9.5700 -137.1500      32.1        58       105        60
OIR    2025130    131400   -9.5700 -137.1600      32.3        58       105        60
OIR    2025130    131400   -9.5700 -137.1700      32.4        58       108        60
OIR    2025130    131400   -9.5700 -137.1800      32.6        59       110        60
OIR    2025130    131400   -9.5700 -137.1900      32.5        59       109        60
OIR    2025130    131400   -9.5700 -137.2000      32.2        59       108        60
OIR    2025130    131400   -9.5700 -137.2100      31.7        59       105        60
OIR    2025130    131400   -9.5700 -137.2200      31.3        59       103        60
OIR    2025130    131400   -9.5700 -137.2300      30.9        59       103        60
OIR    2025130    131400   -9.5700 -137.2400      30.6        59       103        60
OIR    2025130    131400   -9.5700 -137.2500      30.4        59       103        60
OIR    2025130    131400   -9.5700 -137.2600      30.1        59       103        60
OIR    2025130    131400   -9.5700 -137.2700      29.9        59       103        60
OIR    2025130    131400   -9.5700 -137.2800      29.7        59       103        60
OIR    2025130    131400   -9.5700 -137.2900      29.5        59       103        60
OIR    2025130    131400   -9.5700 -137.3000      29.4        59       103        60
OIR    2025130    131400   -9.5700 -137.3100      29.2        60       103        60
OIR    2025130    131400   -9.5700 -137.3200      29.2        60       103        60
OIR    2025130    131400   -9.5700 -137.3300      29.1        60       103        60
OIR    2025130    131400   -9.5700 -137.3400      29.1        60       103        60
OIR    2025130    131400   -9.5700 -137.3500      29.1        60       103        60
OIR    2025130    131400   -9.5700 -137.3600      29.1        59       103        60
OIR    2025130    131400   -9.5700 -137.3700      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.3800      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.3900      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4000      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4100      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4200      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4300      28.9        59       103        60
OIR    2025130    131400   -9.5700 -137.4400      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4500      29.0        59       103        60
OIR    2025130    131400   -9.5700 -137.4600      29.1        59       103        60
OIR    2025130    131400   -9.5700 -137.4700      28.9        59       103        60
OIR    2025130    131400   -9.5700 -137.4800      28.3        58       103        60
OIR    2025130    131400   -9.5700 -137.4900      27.3        56       103        60
OIR    2025130    131400   -9.5700 -137.5000      26.5        54       103        60
OIR    2025130    131400   -9.5700 -137.5100      25.8        51       103        60
OIR    2025130    131400   -9.5700 -137.5200      25.0        47       103        60
OIR    2025130    131400   -9.5700 -137.5300      24.4        43       103        60
OIR    2025130    131400   -9.5700 -137.5400      23.9        39       103        60
OIR    2025130    131400   -9.5700 -137.5500      23.2        35       103        60
OIR    2025130    131400   -9.5700 -137.5600      22.6        33       103        60
OIR    2025130    131400   -9.5700 -137.5700      21.6        31       103        60
OIR    2025130    131400   -9.5700 -137.5800      20.0        28       103        60
OIR    2025130    131400   -9.5700 -137.5900      18.4        25       103        60
OIR    2025130    131400   -9.5700 -137.6000      17.5        23       103        60
OIR    2025130    131400   -9.5700 -137.6100      16.9        20       103        60
OIR    2025130    131400   -9.5700 -137.6200      16.1        17       103        60
OIR    2025130    131400   -9.5700 -137.6300      15.9        14       103        60
OIR    2025130    131400   -9.5700 -137.6400      16.0        10       103        60
OIR    2025130    131400   -9.5700 -137.6500      16.7         4       103        60
OIR    2025130    131400   -9.5700 -137.6600      17.2         2       103        60
OIR    2025130    131400   -9.5700 -137.6700      17.7       360       103        60
OIR    2025130    131400   -9.5700 -137.6800      18.5       357       103        60
OIR    2025130    131400   -9.5700 -137.6900      19.5       355       103        60
OIR    2025130    131400   -9.5700 -137.7000      20.6       354       103        60
OIR    2025130    131400   -9.5700 -137.7100      21.4       353       103        60
OIR    2025130    131400   -9.5700 -137.7200      23.4       351       103        60
OIR    2025130    131400   -9.5700 -137.7300      24.4       351       103        60
OIR    2025130    131400   -9.5700 -137.7400      24.8       351       103        60
OIR    2025130    131400   -9.5700 -137.7500      25.2       352       103        60
OIR    2025130    131400   -9.5700 -137.7600      25.4       352       103        60
OIR    2025130    131400   -9.5700 -137.7700      25.6       352       103        60
OIR    2025130    131400   -9.5700 -137.7800      25.8       352       103        60
OIR    2025130    131400   -9.5700 -137.7900      25.9       353       103        60
OIR    2025130    131400   -9.5700 -137.8000      26.1       353       103        60
OIR    2025130    131400   -9.5700 -137.8100      26.4       354       103        60
OIR    2025130    131400   -9.5700 -137.8200      26.7       354       103        60
OIR    2025130    131400   -9.5700 -137.8300      27.2       355       103        60
OIR    2025130    131400   -9.5700 -137.8400      27.9       355       103        60
OIR    2025130    131400   -9.5700 -137.8500      28.3       354       103        60
OIR    2025130    131400   -9.5700 -137.8600      28.5       352       103        60
OIR    2025130    131400   -9.5700 -137.8700      28.4       351       103        60
OIR    2025130    131400   -9.5700 -137.8800      28.1       349       103        60
OIR    2025130    131400   -9.5700 -137.8900      27.5       345       103        60
OIR    2025130    131400   -9.5700 -137.9000      26.2       338       103        60
OIR    2025130    131400   -9.5700 -137.9100      24.7       330       103        60
OIR    2025130    131400   -9.5700 -137.9200      23.8       324       103        60
OIR    2025130    131400   -9.5700 -137.9300      23.5       322       104        60
OIR    2025130    131400   -9.5700 -137.9400      23.3       321       109        60
OIR    2025130    131400   -9.5700 -137.9500      23.2       321       113        60
OIR    2025130    131400   -9.5700 -137.9600      23.0       321       115        60
OIR    2025130    131400   -9.5700 -137.9700      22.8       321       116        60
OIR    2025130    131400   -9.5700 -137.9800      22.6       321       116        60
OIR    2025130    131400   -9.5700 -137.9900      22.4       321       117        60
OIR    2025130    131400   -9.5700 -138.0000      22.3       321       119        60
OIR    2025130    131400   -9.5700 -138.0100      22.3       321       120        60
OIR    2025130    131400   -9.5700 -138.0200      22.2       321       121        60
OIR    2025130    131400   -9.5700 -138.0300      22.2       321       122        60
OIR    2025130    131400   -9.5700 -138.0400      22.2       321       123        60
OIR    2025130    131400   -9.5700 -138.0500      22.3       321       123        60
OIR    2025130    131400   -9.5700 -138.0600      22.3       321       123        60
OIR    2025130    131400   -9.5700 -138.0700      22.4       321       124        60
OIR    2025130    131400   -9.5700 -138.0800      22.5       321       125        60
OIR    2025130    131400   -9.5700 -138.0900      22.6       320       124        60
OIR    2025130    131400   -9.5700 -138.1000      22.7       320       124        60
OIR    2025130    131400   -9.5700 -138.1100      22.9       320       126        60
OIR    2025130    131400   -9.5700 -138.1200      23.0       320       127        60
OIR    2025130    131400   -9.5700 -138.1300      23.2       319       128        60
OIR    2025130    131400   -9.5700 -138.1400      23.3       319       130        60
OIR    2025130    131400   -9.5700 -138.1500      23.5       318       134        60
OIR    2025130    131400   -9.5700 -138.1600      23.5       318       139        60
OIR    2025130    131400   -9.5700 -138.1700      23.7       318       143        60
OIR    2025130    131400   -9.5700 -138.1800      23.8       318       145        60
OIR    2025130    131400   -9.5700 -138.1900      23.9       318       146        60
OIR    2025130    131400   -9.5700 -138.2000      23.9       318       144        60
OIR    2025130    131400   -9.5700 -138.2100      23.9       318       143        60
OIR    2025130    131400   -9.5700 -138.2200      23.9       319       140        60
OIR    2025130    131400   -9.5700 -138.2300      23.7       320       139        60
OIR    2025130    131400   -9.5700 -138.2400      23.6       321       137        60
OIR    2025130    131400   -9.5700 -138.2500      23.5       322       137        60
OIR    2025130    131400   -9.5700 -138.2600      23.3       322       137        60
OIR    2025130    131400   -9.5700 -138.2700      23.2       323       137        60
OIR    2025130    131400   -9.5700 -138.2800      23.1       323       137        60
OIR    2025130    131400   -9.5700 -138.2900      23.0       324       137        60
OIR    2025130    131400   -9.5700 -138.3000      22.9       324       137        60
OIR    2025130    131400   -9.5700 -138.3100      22.7       325       137        60
OIR    2025130    131400   -9.5700 -138.3200      22.6       326       138        60
OIR    2025130    131400   -9.5700 -138.3300      22.4       327       141        60
OIR    2025130    131400   -9.5700 -138.3400      22.2       327       142        60
OIR    2025130    131400   -9.5700 -138.3500      22.1       327       142        60
OIR    2025130    131400   -9.5700 -138.3600      22.0       327       141        60
OIR    2025130    131400   -9.5700 -138.3700      22.0       328       141        60
OIR    2025130    131400   -9.5700 -138.3800      21.9       328       142        60
OIR    2025130    131400   -9.5700 -138.3900      21.9       328       143        60
OIR    2025130    131400   -9.5700 -138.4000      21.9       328       143        60
OIR    2025130    131400   -9.5700 -138.4100      21.8       328       142        60
OIR    2025130    131400   -9.5700 -138.4200      21.7       329       140        60
OIR    2025130    131400   -9.5700 -138.4300      21.7       329       137        60
OIR    2025130    131400   -9.5700 -138.4400      21.7       330       134        60
OIR    2025130    131400   -9.5700 -138.4500      21.8       331       132        60
OIR    2025130    131400   -9.5700 -138.4600      21.7       332       130        60
OIR    2025130    131400   -9.5700 -138.4700      21.4       333       130        60
OIR    2025130    131400   -9.5700 -138.4800      21.2       334       130        60
OIR    2025130    131400   -9.5700 -138.4900      21.1       334       131        60
OIR    2025130    131400   -9.5700 -138.5000      21.2       335       133        60
OIR    2025130    131400   -9.5700 -138.5100      22.5       334       136        60
OIR    2025130    131400   -9.5700 -138.5200      23.6       334       140        60
OIR    2025130    131400   -9.5700 -138.5300      24.1       333       146        60
OIR    2025130    131400   -9.5800 -136.1400      37.0        73       141        60
OIR    2025130    131400   -9.5800 -136.1500      37.4        74       135        60
OIR    2025130    131400   -9.5800 -136.1600      39.1        76       131        60
OIR    2025130    131400   -9.5800 -136.1700      39.3        76       128        60
OIR    2025130    131400   -9.5800 -136.1800      39.5        76       125        60
OIR    2025130    131400   -9.5800 -136.1900      39.9        76       122        60
OIR    2025130    131400   -9.5800 -136.2000      40.1        77       121        60
OIR    2025130    131400   -9.5800 -136.2100      39.9        77       121        60
OIR    2025130    131400   -9.5800 -136.2200      40.2        77       123        60
OIR    2025130    131400   -9.5800 -136.2300      40.4        77       126        60
OIR    2025130    131400   -9.5800 -136.2400      40.4        77       130        60
OIR    2025130    131400   -9.5800 -136.2500      40.1        77       133        60
OIR    2025130    131400   -9.5800 -136.2600      39.5        77       136        60
OIR    2025130    131400   -9.5800 -136.2700      38.9        77       137        60
OIR    2025130    131400   -9.5800 -136.2800      38.8        77       137        60
OIR    2025130    131400   -9.5800 -136.2900      38.7        77       137        60
OIR    2025130    131400   -9.5800 -136.3000      38.6        77       135        60
OIR    2025130    131400   -9.5800 -136.3100      38.4        77       135        60
OIR    2025130    131400   -9.5800 -136.3200      38.2        76       135        60
OIR    2025130    131400   -9.5800 -136.3300      38.1        77       135        60
OIR    2025130    131400   -9.5800 -136.3400      38.1        77       135        60
OIR    2025130    131400   -9.5800 -136.3500      38.0        77       139        60
OIR    2025130    131400   -9.5800 -136.3600      37.9        77       140        60
OIR    2025130    131400   -9.5800 -136.3700      37.8        78       136        60
OIR    2025130    131400   -9.5800 -136.3800      37.7        78       136        60
OIR    2025130    131400   -9.5800 -136.3900      37.7        78       136        60
OIR    2025130    131400   -9.5800 -136.4000      37.7        78       135        60
OIR    2025130    131400   -9.5800 -136.4100      37.7        78       134        60
OIR    2025130    131400   -9.5800 -136.4200      37.7        78       131        60
OIR    2025130    131400   -9.5800 -136.4300      37.8        78       130        60
OIR    2025130    131400   -9.5800 -136.4400      38.0        77       133        60
OIR    2025130    131400   -9.5800 -136.4500      37.9        77       135        60
OIR    2025130    131400   -9.5800 -136.4600      37.6        77       139        60
OIR    2025130    131400   -9.5800 -136.4700      37.3        76       139        60
OIR    2025130    131400   -9.5800 -136.4800      37.3        76       133        60
OIR    2025130    131400   -9.5800 -136.4900      37.4        76       131        60
OIR    2025130    131400   -9.5800 -136.5000      37.4        76       129        60
OIR    2025130    131400   -9.5800 -136.5100      37.5        75       128        60
OIR    2025130    131400   -9.5800 -136.5200      37.5        75       127        60
OIR    2025130    131400   -9.5800 -136.5300      37.4        75       130        60
OIR    2025130    131400   -9.5800 -136.5400      37.3        74       132        60
OIR    2025130    131400   -9.5800 -136.5500      37.0        74       133        60
OIR    2025130    131400   -9.5800 -136.5600      36.6        73       133        60
OIR    2025130    131400   -9.5800 -136.5700      36.3        72       135        60
OIR    2025130    131400   -9.5800 -136.5800      36.2        72       136        60
OIR    2025130    131400   -9.5800 -136.5900      36.1        72       138        60
OIR    2025130    131400   -9.5800 -136.6000      35.6        71       138        60
OIR    2025130    131400   -9.5800 -136.6100      33.4        72       138        60
OIR    2025130    131400   -9.5800 -136.6200      31.3        73       136        60
OIR    2025130    131400   -9.5800 -136.6300      30.6        73       133        60
OIR    2025130    131400   -9.5800 -136.6400      30.4        73       131        60
OIR    2025130    131400   -9.5800 -136.6500      29.9        72       129        60
OIR    2025130    131400   -9.5800 -136.6600      29.5        72       128        60
OIR    2025130    131400   -9.5800 -136.6700      29.2        72       127        60
OIR    2025130    131400   -9.5800 -136.6800      29.0        72       126        60
OIR    2025130    131400   -9.5800 -136.6900      28.7        72       125        60
OIR    2025130    131400   -9.5800 -136.7000      28.6        72       124        60
OIR    2025130    131400   -9.5800 -136.7100      28.5        72       124        60
OIR    2025130    131400   -9.5800 -136.7200      28.4        71       124        60
OIR    2025130    131400   -9.5800 -136.7300      28.3        71       123        60
OIR    2025130    131400   -9.5800 -136.7400      28.0        70       122        60
OIR    2025130    131400   -9.5800 -136.7500      27.6        69       120        60
OIR    2025130    131400   -9.5800 -136.7600      26.7        68       119        60
OIR    2025130    131400   -9.5800 -136.7700      26.5        67       116        60
OIR    2025130    131400   -9.5800 -136.7800      26.4        67       113        60
OIR    2025130    131400   -9.5800 -136.7900      26.4        66       111        60
OIR    2025130    131400   -9.5800 -136.8000      26.5        66       109        60
OIR    2025130    131400   -9.5800 -136.8100      26.9        64       108        60
OIR    2025130    131400   -9.5800 -136.8200      27.0        63       105        60
OIR    2025130    131400   -9.5800 -136.8300      27.1        63       104        60
OIR    2025130    131400   -9.5800 -136.8400      27.1        63       104        60
OIR    2025130    131400   -9.5800 -136.8500      27.2        62       104        60
OIR    2025130    131400   -9.5800 -136.8600      27.2        62       103        60
OIR    2025130    131400   -9.5800 -136.8700      27.2        61       103        60
OIR    2025130    131400   -9.5800 -136.8800      27.2        61       104        60
OIR    2025130    131400   -9.5800 -136.8900      27.2        61       108        60
OIR    2025130    131400   -9.5800 -136.9000      27.1        61       110        60
OIR    2025130    131400   -9.5800 -136.9100      27.2        61       111        60
OIR    2025130    131400   -9.5800 -136.9200      27.2        61       111        60
OIR    2025130    131400   -9.5800 -136.9300      27.3        61       110        60
OIR    2025130    131400   -9.5800 -136.9400      27.4        61       108        60
OIR    2025130    131400   -9.5800 -136.9500      27.5        61       108        60
OIR    2025130    131400   -9.5800 -136.9600      27.6        61       109        60
OIR    2025130    131400   -9.5800 -136.9700      27.7        61       108        60
OIR    2025130    131400   -9.5800 -136.9800      27.9        61       107        60
OIR    2025130    131400   -9.5800 -136.9900      28.1        61       109        60
OIR    2025130    131400   -9.5800 -137.0000      28.3        61       110        60
OIR    2025130    131400   -9.5800 -137.0100      28.5        60       110        60
OIR    2025130    131400   -9.5800 -137.0200      28.9        59       110        60
OIR    2025130    131400   -9.5800 -137.0300      29.6        58       111        60
OIR    2025130    131400   -9.5800 -137.0400      30.4        56       111        60
OIR    2025130    131400   -9.5800 -137.0500      31.0        55       110        60
OIR    2025130    131400   -9.5800 -137.0600      31.2        55       109        60
OIR    2025130    131400   -9.5800 -137.0700      31.4        55       108        60
OIR    2025130    131400   -9.5800 -137.0800      31.5        55       109        60
OIR    2025130    131400   -9.5800 -137.0900      31.7        55       109        60
OIR    2025130    131400   -9.5800 -137.1000      31.8        55       107        60
OIR    2025130    131400   -9.5800 -137.1100      31.9        56       107        60
OIR    2025130    131400   -9.5800 -137.1200      32.0        56       110        60
OIR    2025130    131400   -9.5800 -137.1300      32.2        56       110        60
OIR    2025130    131400   -9.5800 -137.1400      32.3        56       107        60
OIR    2025130    131400   -9.5800 -137.1500      32.4        57       104        60
OIR    2025130    131400   -9.5800 -137.1600      32.5        57       105        60
OIR    2025130    131400   -9.5800 -137.1700      32.7        58       108        60
OIR    2025130    131400   -9.5800 -137.1800      32.9        58       109        60
OIR    2025130    131400   -9.5800 -137.1900      32.8        58       108        60
OIR    2025130    131400   -9.5800 -137.2000      32.5        58       107        60
OIR    2025130    131400   -9.5800 -137.2100      32.0        58       104        60
OIR    2025130    131400   -9.5800 -137.2200      31.5        58       103        60
OIR    2025130    131400   -9.5800 -137.2300      31.0        58       103        60
OIR    2025130    131400   -9.5800 -137.2400      30.7        58       103        60
OIR    2025130    131400   -9.5800 -137.2500      30.5        58       103        60
OIR    2025130    131400   -9.5800 -137.2600      30.2        59       103        60
OIR    2025130    131400   -9.5800 -137.2700      30.0        59       103        60
OIR    2025130    131400   -9.5800 -137.2800      29.8        59       103        60
OIR    2025130    131400   -9.5800 -137.2900      29.6        59       103        60
OIR    2025130    131400   -9.5800 -137.3000      29.4        59       103        60
OIR    2025130    131400   -9.5800 -137.3100      29.3        59       103        60
OIR    2025130    131400   -9.5800 -137.3200      29.2        59       103        60
OIR    2025130    131400   -9.5800 -137.3300      29.2        59       103        60
OIR    2025130    131400   -9.5800 -137.3400      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.3500      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.3600      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.3700      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.3800      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.3900      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.4000      29.0        59       103        60
OIR    2025130    131400   -9.5800 -137.4100      29.0        59       103        60
OIR    2025130    131400   -9.5800 -137.4200      29.0        59       103        60
OIR    2025130    131400   -9.5800 -137.4300      29.1        59       103        60
OIR    2025130    131400   -9.5800 -137.4400      29.2        59       103        60
OIR    2025130    131400   -9.5800 -137.4500      29.2        59       103        60
OIR    2025130    131400   -9.5800 -137.4600      29.3        59       103        60
OIR    2025130    131400   -9.5800 -137.4700      29.3        59       103        60
OIR    2025130    131400   -9.5800 -137.4800      29.1        58       103        60
OIR    2025130    131400   -9.5800 -137.4900      28.5        57       103        60
OIR    2025130    131400   -9.5800 -137.5000      27.6        55       103        60
OIR    2025130    131400   -9.5800 -137.5100      27.0        51       103        60
OIR    2025130    131400   -9.5800 -137.5200      26.2        46       103        60
OIR    2025130    131400   -9.5800 -137.5300      25.5        40       103        60
OIR    2025130    131400   -9.5800 -137.5400      25.0        36       103        60
OIR    2025130    131400   -9.5800 -137.5500      24.5        33       103        60
OIR    2025130    131400   -9.5800 -137.5600      23.9        31       103        60
OIR    2025130    131400   -9.5800 -137.5700      22.9        30       103        60
OIR    2025130    131400   -9.5800 -137.5800      21.5        29       103        60
OIR    2025130    131400   -9.5800 -137.5900      19.7        26       103        60
OIR    2025130    131400   -9.5800 -137.6000      18.4        23       103        60
OIR    2025130    131400   -9.5800 -137.6100      17.7        21       103        60
OIR    2025130    131400   -9.5800 -137.6200      17.2        19       103        60
OIR    2025130    131400   -9.5800 -137.6300      16.9        16       103        60
OIR    2025130    131400   -9.5800 -137.6400      16.9        12       103        60
OIR    2025130    131400   -9.5800 -137.6500      17.3         7       103        60
OIR    2025130    131400   -9.5800 -137.6600      17.6         5       103        60
OIR    2025130    131400   -9.5800 -137.6700      17.8         2       103        60
OIR    2025130    131400   -9.5800 -137.6800      18.5       358       103        60
OIR    2025130    131400   -9.5800 -137.6900      19.0       357       103        60
OIR    2025130    131400   -9.5800 -137.7000      19.9       355       103        60
OIR    2025130    131400   -9.5800 -137.7100      21.9       352       103        60
OIR    2025130    131400   -9.5800 -137.7200      23.5       351       103        60
OIR    2025130    131400   -9.5800 -137.7300      24.2       351       103        60
OIR    2025130    131400   -9.5800 -137.7400      24.7       351       103        60
OIR    2025130    131400   -9.5800 -137.7500      25.1       352       103        60
OIR    2025130    131400   -9.5800 -137.7600      25.4       352       103        60
OIR    2025130    131400   -9.5800 -137.7700      25.6       352       103        60
OIR    2025130    131400   -9.5800 -137.7800      25.9       352       103        60
OIR    2025130    131400   -9.5800 -137.7900      26.1       353       103        60
OIR    2025130    131400   -9.5800 -137.8000      26.2       353       103        60
OIR    2025130    131400   -9.5800 -137.8100      26.6       353       103        60
OIR    2025130    131400   -9.5800 -137.8200      27.2       355       103        60
OIR    2025130    131400   -9.5800 -137.8300      28.2       355       103        60
OIR    2025130    131400   -9.5800 -137.8400      29.0       355       103        60
OIR    2025130    131400   -9.5800 -137.8500      29.3       355       103        60
OIR    2025130    131400   -9.5800 -137.8600      29.3       354       103        60
OIR    2025130    131400   -9.5800 -137.8700      29.1       352       103        60
OIR    2025130    131400   -9.5800 -137.8800      28.6       350       103        60
OIR    2025130    131400   -9.5800 -137.8900      28.0       346       103        60
OIR    2025130    131400   -9.5800 -137.9000      27.1       340       103        60
OIR    2025130    131400   -9.5800 -137.9100      25.5       332       103        60
OIR    2025130    131400   -9.5800 -137.9200      24.2       325       104        60
OIR    2025130    131400   -9.5800 -137.9300      23.7       323       104        60
OIR    2025130    131400   -9.5800 -137.9400      23.5       322       109        60
OIR    2025130    131400   -9.5800 -137.9500      23.3       321       113        60
OIR    2025130    131400   -9.5800 -137.9600      23.1       321       115        60
OIR    2025130    131400   -9.5800 -137.9700      22.9       321       116        60
OIR    2025130    131400   -9.5800 -137.9800      22.7       322       116        60
OIR    2025130    131400   -9.5800 -137.9900      22.6       322       119        60
OIR    2025130    131400   -9.5800 -138.0000      22.5       322       121        60
OIR    2025130    131400   -9.5800 -138.0100      22.5       322       122        60
OIR    2025130    131400   -9.5800 -138.0200      22.5       322       122        60
OIR    2025130    131400   -9.5800 -138.0300      22.4       322       123        60
OIR    2025130    131400   -9.5800 -138.0400      22.5       322       123        60
OIR    2025130    131400   -9.5800 -138.0500      22.5       321       123        60
OIR    2025130    131400   -9.5800 -138.0600      22.5       321       123        60
OIR    2025130    131400   -9.5800 -138.0700      22.6       321       125        60
OIR    2025130    131400   -9.5800 -138.0800      22.8       321       127        60
OIR    2025130    131400   -9.5800 -138.0900      22.9       321       125        60
OIR    2025130    131400   -9.5800 -138.1000      23.0       321       125        60
OIR    2025130    131400   -9.5800 -138.1100      23.1       320       127        60
OIR    2025130    131400   -9.5800 -138.1200      23.2       320       129        60
OIR    2025130    131400   -9.5800 -138.1300      23.3       319       130        60
OIR    2025130    131400   -9.5800 -138.1400      23.4       319       132        60
OIR    2025130    131400   -9.5800 -138.1500      23.5       319       135        60
OIR    2025130    131400   -9.5800 -138.1600      23.6       318       139        60
OIR    2025130    131400   -9.5800 -138.1700      23.7       318       143        60
OIR    2025130    131400   -9.5800 -138.1800      23.8       318       145        60
OIR    2025130    131400   -9.5800 -138.1900      23.9       318       145        60
OIR    2025130    131400   -9.5800 -138.2000      23.9       319       144        60
OIR    2025130    131400   -9.5800 -138.2100      23.9       319       142        60
OIR    2025130    131400   -9.5800 -138.2200      23.9       320       141        60
OIR    2025130    131400   -9.5800 -138.2300      23.8       321       139        60
OIR    2025130    131400   -9.5800 -138.2400      23.6       322       138        60
OIR    2025130    131400   -9.5800 -138.2500      23.5       322       137        60
OIR    2025130    131400   -9.5800 -138.2600      23.4       323       136        60
OIR    2025130    131400   -9.5800 -138.2700      23.3       323       136        60
OIR    2025130    131400   -9.5800 -138.2800      23.2       324       136        60
OIR    2025130    131400   -9.5800 -138.2900      23.1       324       137        60
OIR    2025130    131400   -9.5800 -138.3000      22.9       325       137        60
OIR    2025130    131400   -9.5800 -138.3100      22.8       326       136        60
OIR    2025130    131400   -9.5800 -138.3200      22.6       327       137        60
OIR    2025130    131400   -9.5800 -138.3300      22.5       327       139        60
OIR    2025130    131400   -9.5800 -138.3400      22.3       328       140        60
OIR    2025130    131400   -9.5800 -138.3500      22.1       328       141        60
OIR    2025130    131400   -9.5800 -138.3600      22.1       328       140        60
OIR    2025130    131400   -9.5800 -138.3700      22.0       328       140        60
OIR    2025130    131400   -9.5800 -138.3800      22.0       328       141        60
OIR    2025130    131400   -9.5800 -138.3900      21.9       328       142        60
OIR    2025130    131400   -9.5800 -138.4000      21.8       329       143        60
OIR    2025130    131400   -9.5800 -138.4100      21.7       329       143        60
OIR    2025130    131400   -9.5800 -138.4200      21.7       329       142        60
OIR    2025130    131400   -9.5800 -138.4300      21.6       330       140        60
OIR    2025130    131400   -9.5800 -138.4400      21.6       330       136        60
OIR    2025130    131400   -9.5800 -138.4500      21.5       331       134        60
OIR    2025130    131400   -9.5800 -138.4600      21.2       332       133        60
OIR    2025130    131400   -9.5800 -138.4700      20.9       333       133        60
OIR    2025130    131400   -9.5800 -138.4800      20.7       334       133        60
OIR    2025130    131400   -9.5800 -138.4900      20.6       334       135        60
OIR    2025130    131400   -9.5800 -138.5000      20.6       334       138        60
OIR    2025130    131400   -9.5800 -138.5100      21.0       334       142        60
OIR    2025130    131400   -9.5800 -138.5200      21.9       334       147        60
OIR    2025130    131400   -9.5900 -136.1400      36.8        73       137        60
OIR    2025130    131400   -9.5900 -136.1500      37.3        73       131        60
OIR    2025130    131400   -9.5900 -136.1600      39.4        76       130        60
OIR    2025130    131400   -9.5900 -136.1700      39.9        77       129        60
OIR    2025130    131400   -9.5900 -136.1800      40.5        77       127        60
OIR    2025130    131400   -9.5900 -136.1900      41.3        77       124        60
OIR    2025130    131400   -9.5900 -136.2000      41.9        77       121        60
OIR    2025130    131400   -9.5900 -136.2100      41.9        77       120        60
OIR    2025130    131400   -9.5900 -136.2200      42.1        77       122        60
OIR    2025130    131400   -9.5900 -136.2300      42.0        77       124        60
OIR    2025130    131400   -9.5900 -136.2400      41.7        77       128        60
OIR    2025130    131400   -9.5900 -136.2500      41.1        77       131        60
OIR    2025130    131400   -9.5900 -136.2600      40.3        77       135        60
OIR    2025130    131400   -9.5900 -136.2700      39.0        76       136        60
OIR    2025130    131400   -9.5900 -136.2800      38.9        76       136        60
OIR    2025130    131400   -9.5900 -136.2900      38.8        76       136        60
OIR    2025130    131400   -9.5900 -136.3000      38.7        76       135        60
OIR    2025130    131400   -9.5900 -136.3100      38.5        76       136        60
OIR    2025130    131400   -9.5900 -136.3200      38.3        76       136        60
OIR    2025130    131400   -9.5900 -136.3300      38.2        76       136        60
OIR    2025130    131400   -9.5900 -136.3400      38.2        76       136        60
OIR    2025130    131400   -9.5900 -136.3500      38.0        77       138        60
OIR    2025130    131400   -9.5900 -136.3600      38.0        77       140        60
OIR    2025130    131400   -9.5900 -136.3700      37.8        78       139        60
OIR    2025130    131400   -9.5900 -136.3800      37.7        78       139        60
OIR    2025130    131400   -9.5900 -136.3900      37.7        78       138        60
OIR    2025130    131400   -9.5900 -136.4000      37.7        78       138        60
OIR    2025130    131400   -9.5900 -136.4100      37.7        78       137        60
OIR    2025130    131400   -9.5900 -136.4200      37.7        78       135        60
OIR    2025130    131400   -9.5900 -136.4300      37.9        78       134        60
OIR    2025130    131400   -9.5900 -136.4400      38.0        77       134        60
OIR    2025130    131400   -9.5900 -136.4500      37.9        77       135        60
OIR    2025130    131400   -9.5900 -136.4600      37.6        77       137        60
OIR    2025130    131400   -9.5900 -136.4700      37.3        76       137        60
OIR    2025130    131400   -9.5900 -136.4800      37.2        76       134        60
OIR    2025130    131400   -9.5900 -136.4900      37.3        76       132        60
OIR    2025130    131400   -9.5900 -136.5000      37.4        75       130        60
OIR    2025130    131400   -9.5900 -136.5100      37.4        75       128        60
OIR    2025130    131400   -9.5900 -136.5200      37.4        75       126        60
OIR    2025130    131400   -9.5900 -136.5300      37.3        74       129        60
OIR    2025130    131400   -9.5900 -136.5400      37.3        74       130        60
OIR    2025130    131400   -9.5900 -136.5500      37.0        73       131        60
OIR    2025130    131400   -9.5900 -136.5600      36.6        73       131        60
OIR    2025130    131400   -9.5900 -136.5700      36.4        72       132        60
OIR    2025130    131400   -9.5900 -136.5800      36.3        72       134        60
OIR    2025130    131400   -9.5900 -136.5900      36.2        71       137        60
OIR    2025130    131400   -9.5900 -136.6000      36.1        71       137        60
OIR    2025130    131400   -9.5900 -136.6100      35.5        71       137        60
OIR    2025130    131400   -9.5900 -136.6200      33.8        72       137        60
OIR    2025130    131400   -9.5900 -136.6300      32.7        72       136        60
OIR    2025130    131400   -9.5900 -136.6400      31.8        72       133        60
OIR    2025130    131400   -9.5900 -136.6500      31.2        72       130        60
OIR    2025130    131400   -9.5900 -136.6600      30.5        72       129        60
OIR    2025130    131400   -9.5900 -136.6700      29.9        72       127        60
OIR    2025130    131400   -9.5900 -136.6800      29.5        72       126        60
OIR    2025130    131400   -9.5900 -136.6900      29.2        72       125        60
OIR    2025130    131400   -9.5900 -136.7000      29.0        72       126        60
OIR    2025130    131400   -9.5900 -136.7100      28.8        72       125        60
OIR    2025130    131400   -9.5900 -136.7200      28.6        71       124        60
OIR    2025130    131400   -9.5900 -136.7300      28.5        71       124        60
OIR    2025130    131400   -9.5900 -136.7400      28.2        70       123        60
OIR    2025130    131400   -9.5900 -136.7500      27.8        69       122        60
OIR    2025130    131400   -9.5900 -136.7600      26.7        68       120        60
OIR    2025130    131400   -9.5900 -136.7700      26.5        67       116        60
OIR    2025130    131400   -9.5900 -136.7800      26.5        67       115        60
OIR    2025130    131400   -9.5900 -136.7900      26.4        66       112        60
OIR    2025130    131400   -9.5900 -136.8000      26.5        65       110        60
OIR    2025130    131400   -9.5900 -136.8100      26.8        64       108        60
OIR    2025130    131400   -9.5900 -136.8200      27.0        63       105        60
OIR    2025130    131400   -9.5900 -136.8300      27.0        63       104        60
OIR    2025130    131400   -9.5900 -136.8400      27.1        62       104        60
OIR    2025130    131400   -9.5900 -136.8500      27.1        62       103        60
OIR    2025130    131400   -9.5900 -136.8600      27.1        61       103        60
OIR    2025130    131400   -9.5900 -136.8700      27.1        61       103        60
OIR    2025130    131400   -9.5900 -136.8800      27.1        61       104        60
OIR    2025130    131400   -9.5900 -136.8900      27.1        61       105        60
OIR    2025130    131400   -9.5900 -136.9000      27.1        61       109        60
OIR    2025130    131400   -9.5900 -136.9100      27.1        61       111        60
OIR    2025130    131400   -9.5900 -136.9200      27.2        61       111        60
OIR    2025130    131400   -9.5900 -136.9300      27.2        61       110        60
OIR    2025130    131400   -9.5900 -136.9400      27.3        61       109        60
OIR    2025130    131400   -9.5900 -136.9500      27.4        61       109        60
OIR    2025130    131400   -9.5900 -136.9600      27.5        61       110        60
OIR    2025130    131400   -9.5900 -136.9700      27.6        61       108        60
OIR    2025130    131400   -9.5900 -136.9800      27.8        61       107        60
OIR    2025130    131400   -9.5900 -136.9900      28.0        60       108        60
OIR    2025130    131400   -9.5900 -137.0000      28.3        60       110        60
OIR    2025130    131400   -9.5900 -137.0100      28.7        59       111        60
OIR    2025130    131400   -9.5900 -137.0200      29.2        58       111        60
OIR    2025130    131400   -9.5900 -137.0300      29.8        57       111        60
OIR    2025130    131400   -9.5900 -137.0400      30.5        55       111        60
OIR    2025130    131400   -9.5900 -137.0500      31.1        54       110        60
OIR    2025130    131400   -9.5900 -137.0600      31.4        54       108        60
OIR    2025130    131400   -9.5900 -137.0700      31.6        54       105        60
OIR    2025130    131400   -9.5900 -137.0800      31.8        54       107        60
OIR    2025130    131400   -9.5900 -137.0900      32.0        54       107        60
OIR    2025130    131400   -9.5900 -137.1000      32.2        54       107        60
OIR    2025130    131400   -9.5900 -137.1100      32.3        54       107        60
OIR    2025130    131400   -9.5900 -137.1200      32.3        55       109        60
OIR    2025130    131400   -9.5900 -137.1300      32.4        55       108        60
OIR    2025130    131400   -9.5900 -137.1400      32.6        55       105        60
OIR    2025130    131400   -9.5900 -137.1500      32.7        56       104        60
OIR    2025130    131400   -9.5900 -137.1600      32.8        56       105        60
OIR    2025130    131400   -9.5900 -137.1700      32.9        57       107        60
OIR    2025130    131400   -9.5900 -137.1800      33.1        57       108        60
OIR    2025130    131400   -9.5900 -137.1900      33.0        57       107        60
OIR    2025130    131400   -9.5900 -137.2000      32.8        58       105        60
OIR    2025130    131400   -9.5900 -137.2100      32.1        58       104        60
OIR    2025130    131400   -9.5900 -137.2200      31.8        58       103        60
OIR    2025130    131400   -9.5900 -137.2300      31.2        58       103        60
OIR    2025130    131400   -9.5900 -137.2400      30.8        58       103        60
OIR    2025130    131400   -9.5900 -137.2500      30.6        58       103        60
OIR    2025130    131400   -9.5900 -137.2600      30.4        58       103        60
OIR    2025130    131400   -9.5900 -137.2700      30.1        58       103        60
OIR    2025130    131400   -9.5900 -137.2800      29.9        59       103        60
OIR    2025130    131400   -9.5900 -137.2900      29.6        59       103        60
OIR    2025130    131400   -9.5900 -137.3000      29.5        59       103        60
OIR    2025130    131400   -9.5900 -137.3100      29.4        59       103        60
OIR    2025130    131400   -9.5900 -137.3200      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.3300      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.3400      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.3500      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.3600      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.3700      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.3800      29.1        59       103        60
OIR    2025130    131400   -9.5900 -137.3900      29.1        59       103        60
OIR    2025130    131400   -9.5900 -137.4000      29.1        59       103        60
OIR    2025130    131400   -9.5900 -137.4100      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.4200      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.4300      29.2        59       103        60
OIR    2025130    131400   -9.5900 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.4600      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.4700      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.4800      29.3        59       103        60
OIR    2025130    131400   -9.5900 -137.4900      29.1        58       103        60
OIR    2025130    131400   -9.5900 -137.5000      28.5        55       103        60
OIR    2025130    131400   -9.5900 -137.5100      28.0        51       103        60
OIR    2025130    131400   -9.5900 -137.5200      27.1        44       103        60
OIR    2025130    131400   -9.5900 -137.5300      26.3        37       103        60
OIR    2025130    131400   -9.5900 -137.5400      25.7        33       103        60
OIR    2025130    131400   -9.5900 -137.5500      25.3        30       103        60
OIR    2025130    131400   -9.5900 -137.5600      25.0        29       103        60
OIR    2025130    131400   -9.5900 -137.5700      24.4        28       103        60
OIR    2025130    131400   -9.5900 -137.5800      23.6        27       103        60
OIR    2025130    131400   -9.5900 -137.5900      22.1        26       103        60
OIR    2025130    131400   -9.5900 -137.6000      19.6        25       103        60
OIR    2025130    131400   -9.5900 -137.6100      18.4        23       103        60
OIR    2025130    131400   -9.5900 -137.6200      18.0        20       103        60
OIR    2025130    131400   -9.5900 -137.6300      17.7        17       103        60
OIR    2025130    131400   -9.5900 -137.6400      17.7        11       103        60
OIR    2025130    131400   -9.5900 -137.6500      17.8         8       103        60
OIR    2025130    131400   -9.5900 -137.6600      17.9         6       103        60
OIR    2025130    131400   -9.5900 -137.6700      18.0         4       103        60
OIR    2025130    131400   -9.5900 -137.6800      18.6       359       103        60
OIR    2025130    131400   -9.5900 -137.6900      18.9       357       103        60
OIR    2025130    131400   -9.5900 -137.7000      19.6       356       103        60
OIR    2025130    131400   -9.5900 -137.7100      21.7       352       103        60
OIR    2025130    131400   -9.5900 -137.7200      23.1       351       103        60
OIR    2025130    131400   -9.5900 -137.7300      24.0       351       103        60
OIR    2025130    131400   -9.5900 -137.7400      24.5       352       103        60
OIR    2025130    131400   -9.5900 -137.7500      24.9       352       103        60
OIR    2025130    131400   -9.5900 -137.7600      25.4       352       103        60
OIR    2025130    131400   -9.5900 -137.7700      25.7       352       103        60
OIR    2025130    131400   -9.5900 -137.7800      26.0       352       103        60
OIR    2025130    131400   -9.5900 -137.7900      26.2       353       103        60
OIR    2025130    131400   -9.5900 -137.8000      26.5       353       103        60
OIR    2025130    131400   -9.5900 -137.8100      27.1       353       103        60
OIR    2025130    131400   -9.5900 -137.8200      28.2       355       103        60
OIR    2025130    131400   -9.5900 -137.8300      29.4       356       103        60
OIR    2025130    131400   -9.5900 -137.8400      30.2       356       104        60
OIR    2025130    131400   -9.5900 -137.8500      30.4       355       104        60
OIR    2025130    131400   -9.5900 -137.8600      30.3       355       104        60
OIR    2025130    131400   -9.5900 -137.8700      29.9       354       104        60
OIR    2025130    131400   -9.5900 -137.8800      29.4       351       103        60
OIR    2025130    131400   -9.5900 -137.8900      28.9       348       103        60
OIR    2025130    131400   -9.5900 -137.9000      27.9       343       103        60
OIR    2025130    131400   -9.5900 -137.9100      26.7       335       104        60
OIR    2025130    131400   -9.5900 -137.9200      25.0       327       104        60
OIR    2025130    131400   -9.5900 -137.9300      24.0       324       104        60
OIR    2025130    131400   -9.5900 -137.9400      23.7       323       108        60
OIR    2025130    131400   -9.5900 -137.9500      23.4       322       111        60
OIR    2025130    131400   -9.5900 -137.9600      23.2       322       114        60
OIR    2025130    131400   -9.5900 -137.9700      23.0       322       116        60
OIR    2025130    131400   -9.5900 -137.9800      22.8       322       116        60
OIR    2025130    131400   -9.5900 -137.9900      22.7       322       117        60
OIR    2025130    131400   -9.5900 -138.0000      22.7       322       120        60
OIR    2025130    131400   -9.5900 -138.0100      22.7       322       121        60
OIR    2025130    131400   -9.5900 -138.0200      22.6       322       122        60
OIR    2025130    131400   -9.5900 -138.0300      22.6       322       122        60
OIR    2025130    131400   -9.5900 -138.0400      22.7       322       122        60
OIR    2025130    131400   -9.5900 -138.0500      22.7       322       122        60
OIR    2025130    131400   -9.5900 -138.0600      22.8       322       122        60
OIR    2025130    131400   -9.5900 -138.0700      22.9       322       125        60
OIR    2025130    131400   -9.5900 -138.0800      23.0       321       126        60
OIR    2025130    131400   -9.5900 -138.0900      23.1       321       124        60
OIR    2025130    131400   -9.5900 -138.1000      23.2       321       124        60
OIR    2025130    131400   -9.5900 -138.1100      23.2       321       125        60
OIR    2025130    131400   -9.5900 -138.1200      23.3       320       127        60
OIR    2025130    131400   -9.5900 -138.1300      23.4       320       129        60
OIR    2025130    131400   -9.5900 -138.1400      23.4       320       131        60
OIR    2025130    131400   -9.5900 -138.1500      23.5       319       133        60
OIR    2025130    131400   -9.5900 -138.1600      23.6       319       136        60
OIR    2025130    131400   -9.5900 -138.1700      23.7       319       139        60
OIR    2025130    131400   -9.5900 -138.1800      23.8       319       142        60
OIR    2025130    131400   -9.5900 -138.1900      23.9       319       143        60
OIR    2025130    131400   -9.5900 -138.2000      23.9       319       142        60
OIR    2025130    131400   -9.5900 -138.2100      23.9       320       142        60
OIR    2025130    131400   -9.5900 -138.2200      23.9       321       143        60
OIR    2025130    131400   -9.5900 -138.2300      23.8       321       140        60
OIR    2025130    131400   -9.5900 -138.2400      23.7       322       135        60
OIR    2025130    131400   -9.5900 -138.2500      23.6       323       135        60
OIR    2025130    131400   -9.5900 -138.2600      23.5       323       134        60
OIR    2025130    131400   -9.5900 -138.2700      23.3       324       135        60
OIR    2025130    131400   -9.5900 -138.2800      23.2       324       135        60
OIR    2025130    131400   -9.5900 -138.2900      23.1       325       135        60
OIR    2025130    131400   -9.5900 -138.3000      23.0       326       135        60
OIR    2025130    131400   -9.5900 -138.3100      22.9       326       136        60
OIR    2025130    131400   -9.5900 -138.3200      22.7       327       136        60
OIR    2025130    131400   -9.5900 -138.3300      22.5       328       137        60
OIR    2025130    131400   -9.5900 -138.3400      22.4       328       138        60
OIR    2025130    131400   -9.5900 -138.3500      22.2       328       138        60
OIR    2025130    131400   -9.5900 -138.3600      22.1       328       139        60
OIR    2025130    131400   -9.5900 -138.3700      22.1       328       139        60
OIR    2025130    131400   -9.5900 -138.3800      22.0       329       141        60
OIR    2025130    131400   -9.5900 -138.3900      21.9       329       142        60
OIR    2025130    131400   -9.5900 -138.4000      21.8       329       143        60
OIR    2025130    131400   -9.5900 -138.4100      21.7       329       144        60
OIR    2025130    131400   -9.5900 -138.4200      21.6       330       144        60
OIR    2025130    131400   -9.5900 -138.4300      21.5       330       142        60
OIR    2025130    131400   -9.5900 -138.4400      21.2       331       136        60
OIR    2025130    131400   -9.5900 -138.4500      21.1       331       134        60
OIR    2025130    131400   -9.5900 -138.4600      20.9       333       135        60
OIR    2025130    131400   -9.5900 -138.4700      20.7       334       136        60
OIR    2025130    131400   -9.5900 -138.4800      20.6       334       136        60
OIR    2025130    131400   -9.5900 -138.4900      20.6       334       139        60
OIR    2025130    131400   -9.5900 -138.5000      20.6       334       142        60
OIR    2025130    131400   -9.5900 -138.5100      20.6       334       147        60
OIR    2025130    131400   -9.6000 -136.1300      36.7        73       144        60
OIR    2025130    131400   -9.6000 -136.1400      36.7        73       133        60
OIR    2025130    131400   -9.6000 -136.1500      37.4        74       128        60
OIR    2025130    131400   -9.6000 -136.1600      39.8        76       128        60
OIR    2025130    131400   -9.6000 -136.1700      40.9        77       130        60
OIR    2025130    131400   -9.6000 -136.1800      41.8        77       129        60
OIR    2025130    131400   -9.6000 -136.1900      42.3        77       126        60
OIR    2025130    131400   -9.6000 -136.2000      42.5        77       122        60
OIR    2025130    131400   -9.6000 -136.2100      42.5        77       120        60
OIR    2025130    131400   -9.6000 -136.2200      42.5        77       121        60
OIR    2025130    131400   -9.6000 -136.2300      42.5        77       122        60
OIR    2025130    131400   -9.6000 -136.2400      42.3        77       126        60
OIR    2025130    131400   -9.6000 -136.2500      41.9        77       130        60
OIR    2025130    131400   -9.6000 -136.2600      41.2        77       134        60
OIR    2025130    131400   -9.6000 -136.2700      39.1        76       135        60
OIR    2025130    131400   -9.6000 -136.2800      38.9        76       135        60
OIR    2025130    131400   -9.6000 -136.2900      38.8        76       135        60
OIR    2025130    131400   -9.6000 -136.3000      38.7        76       134        60
OIR    2025130    131400   -9.6000 -136.3100      38.6        76       136        60
OIR    2025130    131400   -9.6000 -136.3200      38.4        76       138        60
OIR    2025130    131400   -9.6000 -136.3300      38.3        76       137        60
OIR    2025130    131400   -9.6000 -136.3400      38.2        76       136        60
OIR    2025130    131400   -9.6000 -136.3500      38.1        76       137        60
OIR    2025130    131400   -9.6000 -136.3600      38.1        77       139        60
OIR    2025130    131400   -9.6000 -136.3700      38.0        77       142        60
OIR    2025130    131400   -9.6000 -136.3800      37.9        77       142        60
OIR    2025130    131400   -9.6000 -136.3900      37.9        78       141        60
OIR    2025130    131400   -9.6000 -136.4000      37.9        77       140        60
OIR    2025130    131400   -9.6000 -136.4100      37.9        77       140        60
OIR    2025130    131400   -9.6000 -136.4200      37.8        76       139        60
OIR    2025130    131400   -9.6000 -136.4300      37.7        76       138        60
OIR    2025130    131400   -9.6000 -136.4400      37.8        76       136        60
OIR    2025130    131400   -9.6000 -136.4500      37.7        76       134        60
OIR    2025130    131400   -9.6000 -136.4600      37.5        76       134        60
OIR    2025130    131400   -9.6000 -136.4700      37.3        76       135        60
OIR    2025130    131400   -9.6000 -136.4800      37.2        76       136        60
OIR    2025130    131400   -9.6000 -136.4900      37.2        75       133        60
OIR    2025130    131400   -9.6000 -136.5000      37.2        75       130        60
OIR    2025130    131400   -9.6000 -136.5100      37.3        75       128        60
OIR    2025130    131400   -9.6000 -136.5200      37.3        74       126        60
OIR    2025130    131400   -9.6000 -136.5300      37.2        74       127        60
OIR    2025130    131400   -9.6000 -136.5400      37.2        74       128        60
OIR    2025130    131400   -9.6000 -136.5500      36.9        73       129        60
OIR    2025130    131400   -9.6000 -136.5600      36.6        72       129        60
OIR    2025130    131400   -9.6000 -136.5700      36.4        72       130        60
OIR    2025130    131400   -9.6000 -136.5800      36.3        71       132        60
OIR    2025130    131400   -9.6000 -136.5900      36.2        71       136        60
OIR    2025130    131400   -9.6000 -136.6000      36.1        71       137        60
OIR    2025130    131400   -9.6000 -136.6100      35.7        71       137        60
OIR    2025130    131400   -9.6000 -136.6200      34.7        71       138        60
OIR    2025130    131400   -9.6000 -136.6300      33.6        71       138        60
OIR    2025130    131400   -9.6000 -136.6400      32.5        71       134        60
OIR    2025130    131400   -9.6000 -136.6500      31.8        71       132        60
OIR    2025130    131400   -9.6000 -136.6600      31.2        72       130        60
OIR    2025130    131400   -9.6000 -136.6700      30.5        72       128        60
OIR    2025130    131400   -9.6000 -136.6800      30.0        72       126        60
OIR    2025130    131400   -9.6000 -136.6900      29.7        72       126        60
OIR    2025130    131400   -9.6000 -136.7000      29.5        72       127        60
OIR    2025130    131400   -9.6000 -136.7100      29.2        71       126        60
OIR    2025130    131400   -9.6000 -136.7200      29.0        71       124        60
OIR    2025130    131400   -9.6000 -136.7300      28.8        70       124        60
OIR    2025130    131400   -9.6000 -136.7400      28.6        70       124        60
OIR    2025130    131400   -9.6000 -136.7500      28.2        69       122        60
OIR    2025130    131400   -9.6000 -136.7600      27.1        68       120        60
OIR    2025130    131400   -9.6000 -136.7700      26.6        67       117        60
OIR    2025130    131400   -9.6000 -136.7800      26.5        67       116        60
OIR    2025130    131400   -9.6000 -136.7900      26.5        66       114        60
OIR    2025130    131400   -9.6000 -136.8000      26.5        65       111        60
OIR    2025130    131400   -9.6000 -136.8100      26.7        64       108        60
OIR    2025130    131400   -9.6000 -136.8200      26.9        63       105        60
OIR    2025130    131400   -9.6000 -136.8300      27.0        62       104        60
OIR    2025130    131400   -9.6000 -136.8400      27.0        62       104        60
OIR    2025130    131400   -9.6000 -136.8500      27.1        61       103        60
OIR    2025130    131400   -9.6000 -136.8600      27.1        61       103        60
OIR    2025130    131400   -9.6000 -136.8700      27.1        61       103        60
OIR    2025130    131400   -9.6000 -136.8800      27.1        61       104        60
OIR    2025130    131400   -9.6000 -136.8900      27.1        61       105        60
OIR    2025130    131400   -9.6000 -136.9000      27.1        61       109        60
OIR    2025130    131400   -9.6000 -136.9100      27.1        61       110        60
OIR    2025130    131400   -9.6000 -136.9200      27.1        61       111        60
OIR    2025130    131400   -9.6000 -136.9300      27.2        61       110        60
OIR    2025130    131400   -9.6000 -136.9400      27.2        61       110        60
OIR    2025130    131400   -9.6000 -136.9500      27.3        60       110        60
OIR    2025130    131400   -9.6000 -136.9600      27.4        60       110        60
OIR    2025130    131400   -9.6000 -136.9700      27.5        60       108        60
OIR    2025130    131400   -9.6000 -136.9800      27.6        60       107        60
OIR    2025130    131400   -9.6000 -136.9900      27.9        60       108        60
OIR    2025130    131400   -9.6000 -137.0000      28.3        59       109        60
OIR    2025130    131400   -9.6000 -137.0100      28.8        58       111        60
OIR    2025130    131400   -9.6000 -137.0200      29.4        57       111        60
OIR    2025130    131400   -9.6000 -137.0300      30.1        55       111        60
OIR    2025130    131400   -9.6000 -137.0400      30.6        54       111        60
OIR    2025130    131400   -9.6000 -137.0500      31.2        54       110        60
OIR    2025130    131400   -9.6000 -137.0600      31.5        53       107        60
OIR    2025130    131400   -9.6000 -137.0700      31.8        53       104        60
OIR    2025130    131400   -9.6000 -137.0800      32.0        53       104        60
OIR    2025130    131400   -9.6000 -137.0900      32.2        53       105        60
OIR    2025130    131400   -9.6000 -137.1000      32.4        53       105        60
OIR    2025130    131400   -9.6000 -137.1100      32.6        53       105        60
OIR    2025130    131400   -9.6000 -137.1200      32.7        53       107        60
OIR    2025130    131400   -9.6000 -137.1300      32.8        54       107        60
OIR    2025130    131400   -9.6000 -137.1400      32.8        54       105        60
OIR    2025130    131400   -9.6000 -137.1500      32.9        55       104        60
OIR    2025130    131400   -9.6000 -137.1600      33.0        55       105        60
OIR    2025130    131400   -9.6000 -137.1700      33.1        56       107        60
OIR    2025130    131400   -9.6000 -137.1800      33.2        56       108        60
OIR    2025130    131400   -9.6000 -137.1900      33.1        57       105        60
OIR    2025130    131400   -9.6000 -137.2000      32.8        57       104        60
OIR    2025130    131400   -9.6000 -137.2100      32.3        57       104        60
OIR    2025130    131400   -9.6000 -137.2200      32.0        57       103        60
OIR    2025130    131400   -9.6000 -137.2300      31.4        57       103        60
OIR    2025130    131400   -9.6000 -137.2400      31.0        57       103        60
OIR    2025130    131400   -9.6000 -137.2500      30.7        58       103        60
OIR    2025130    131400   -9.6000 -137.2600      30.5        58       103        60
OIR    2025130    131400   -9.6000 -137.2700      30.3        58       103        60
OIR    2025130    131400   -9.6000 -137.2800      30.0        58       103        60
OIR    2025130    131400   -9.6000 -137.2900      29.7        59       103        60
OIR    2025130    131400   -9.6000 -137.3000      29.5        59       103        60
OIR    2025130    131400   -9.6000 -137.3100      29.4        59       103        60
OIR    2025130    131400   -9.6000 -137.3200      29.4        59       103        60
OIR    2025130    131400   -9.6000 -137.3300      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.3400      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.3500      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.3600      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.3700      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.3800      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.3900      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.4000      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.4100      29.2        59       103        60
OIR    2025130    131400   -9.6000 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.4600      29.3        59       103        60
OIR    2025130    131400   -9.6000 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6000 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6000 -137.4900      29.3        58       103        60
OIR    2025130    131400   -9.6000 -137.5000      29.1        57       103        60
OIR    2025130    131400   -9.6000 -137.5100      28.2        51       103        60
OIR    2025130    131400   -9.6000 -137.5200      27.4        43       103        60
OIR    2025130    131400   -9.6000 -137.5300      26.7        36       103        60
OIR    2025130    131400   -9.6000 -137.5400      26.1        31       103        60
OIR    2025130    131400   -9.6000 -137.5500      25.9        29       103        60
OIR    2025130    131400   -9.6000 -137.5600      25.8        28       103        60
OIR    2025130    131400   -9.6000 -137.5700      25.2        26       103        60
OIR    2025130    131400   -9.6000 -137.5800      24.7        26       103        60
OIR    2025130    131400   -9.6000 -137.5900      23.8        27       103        60
OIR    2025130    131400   -9.6000 -137.6000      21.8        28       103        60
OIR    2025130    131400   -9.6000 -137.6100      19.7        25       103        60
OIR    2025130    131400   -9.6000 -137.6200      18.7        22       103        60
OIR    2025130    131400   -9.6000 -137.6300      18.4        17       103        60
OIR    2025130    131400   -9.6000 -137.6400      17.9        12       103        60
OIR    2025130    131400   -9.6000 -137.6500      17.8        10       103        60
OIR    2025130    131400   -9.6000 -137.6600      17.9         8       103        60
OIR    2025130    131400   -9.6000 -137.6700      18.1         3       103        60
OIR    2025130    131400   -9.6000 -137.6800      18.6       359       103        60
OIR    2025130    131400   -9.6000 -137.6900      19.0       358       103        60
OIR    2025130    131400   -9.6000 -137.7000      19.7       356       103        60
OIR    2025130    131400   -9.6000 -137.7100      21.2       353       103        60
OIR    2025130    131400   -9.6000 -137.7200      22.5       352       103        60
OIR    2025130    131400   -9.6000 -137.7300      23.5       351       103        60
OIR    2025130    131400   -9.6000 -137.7400      24.3       352       103        60
OIR    2025130    131400   -9.6000 -137.7500      25.0       352       103        60
OIR    2025130    131400   -9.6000 -137.7600      25.5       352       103        60
OIR    2025130    131400   -9.6000 -137.7700      25.7       352       103        60
OIR    2025130    131400   -9.6000 -137.7800      26.0       353       103        60
OIR    2025130    131400   -9.6000 -137.7900      26.4       353       103        60
OIR    2025130    131400   -9.6000 -137.8000      27.1       353       103        60
OIR    2025130    131400   -9.6000 -137.8100      28.0       353       103        60
OIR    2025130    131400   -9.6000 -137.8200      29.4       355       103        60
OIR    2025130    131400   -9.6000 -137.8300      30.4       356       104        60
OIR    2025130    131400   -9.6000 -137.8400      30.8       356       104        60
OIR    2025130    131400   -9.6000 -137.8500      30.8       356       104        60
OIR    2025130    131400   -9.6000 -137.8600      30.8       355       104        60
OIR    2025130    131400   -9.6000 -137.8700      30.6       355       104        60
OIR    2025130    131400   -9.6000 -137.8800      30.2       353       104        60
OIR    2025130    131400   -9.6000 -137.8900      29.6       350       104        60
OIR    2025130    131400   -9.6000 -137.9000      29.0       346       104        60
OIR    2025130    131400   -9.6000 -137.9100      27.9       340       104        60
OIR    2025130    131400   -9.6000 -137.9200      25.8       331       104        60
OIR    2025130    131400   -9.6000 -137.9300      24.3       325       104        60
OIR    2025130    131400   -9.6000 -137.9400      23.8       324       107        60
OIR    2025130    131400   -9.6000 -137.9500      23.5       323       110        60
OIR    2025130    131400   -9.6000 -137.9600      23.2       322       113        60
OIR    2025130    131400   -9.6000 -137.9700      23.1       322       116        60
OIR    2025130    131400   -9.6000 -137.9800      22.9       322       116        60
OIR    2025130    131400   -9.6000 -137.9900      22.8       322       117        60
OIR    2025130    131400   -9.6000 -138.0000      22.8       322       120        60
OIR    2025130    131400   -9.6000 -138.0100      22.7       322       121        60
OIR    2025130    131400   -9.6000 -138.0200      22.7       322       122        60
OIR    2025130    131400   -9.6000 -138.0300      22.8       322       122        60
OIR    2025130    131400   -9.6000 -138.0400      22.8       322       122        60
OIR    2025130    131400   -9.6000 -138.0500      22.9       322       122        60
OIR    2025130    131400   -9.6000 -138.0600      22.9       322       122        60
OIR    2025130    131400   -9.6000 -138.0700      23.1       322       124        60
OIR    2025130    131400   -9.6000 -138.0800      23.3       322       125        60
OIR    2025130    131400   -9.6000 -138.0900      23.5       322       124        60
OIR    2025130    131400   -9.6000 -138.1000      23.5       321       124        60
OIR    2025130    131400   -9.6000 -138.1100      23.5       321       126        60
OIR    2025130    131400   -9.6000 -138.1200      23.5       321       128        60
OIR    2025130    131400   -9.6000 -138.1300      23.5       321       130        60
OIR    2025130    131400   -9.6000 -138.1400      23.5       320       131        60
OIR    2025130    131400   -9.6000 -138.1500      23.5       320       132        60
OIR    2025130    131400   -9.6000 -138.1600      23.6       320       134        60
OIR    2025130    131400   -9.6000 -138.1700      23.6       320       137        60
OIR    2025130    131400   -9.6000 -138.1800      23.7       320       141        60
OIR    2025130    131400   -9.6000 -138.1900      23.8       321       143        60
OIR    2025130    131400   -9.6000 -138.2000      23.9       321       142        60
OIR    2025130    131400   -9.6000 -138.2100      23.9       321       141        60
OIR    2025130    131400   -9.6000 -138.2200      23.9       322       143        60
OIR    2025130    131400   -9.6000 -138.2300      23.8       322       139        60
OIR    2025130    131400   -9.6000 -138.2400      23.7       323       134        60
OIR    2025130    131400   -9.6000 -138.2500      23.6       323       134        60
OIR    2025130    131400   -9.6000 -138.2600      23.5       324       134        60
OIR    2025130    131400   -9.6000 -138.2700      23.4       324       134        60
OIR    2025130    131400   -9.6000 -138.2800      23.3       325       134        60
OIR    2025130    131400   -9.6000 -138.2900      23.2       325       135        60
OIR    2025130    131400   -9.6000 -138.3000      23.1       326       135        60
OIR    2025130    131400   -9.6000 -138.3100      23.0       327       135        60
OIR    2025130    131400   -9.6000 -138.3200      22.8       327       135        60
OIR    2025130    131400   -9.6000 -138.3300      22.7       328       136        60
OIR    2025130    131400   -9.6000 -138.3400      22.5       328       136        60
OIR    2025130    131400   -9.6000 -138.3500      22.4       329       137        60
OIR    2025130    131400   -9.6000 -138.3600      22.2       329       138        60
OIR    2025130    131400   -9.6000 -138.3700      22.2       329       140        60
OIR    2025130    131400   -9.6000 -138.3800      22.1       329       141        60
OIR    2025130    131400   -9.6000 -138.3900      21.9       329       142        60
OIR    2025130    131400   -9.6000 -138.4000      21.8       330       143        60
OIR    2025130    131400   -9.6000 -138.4100      21.6       330       143        60
OIR    2025130    131400   -9.6000 -138.4200      21.4       330       145        60
OIR    2025130    131400   -9.6000 -138.4300      21.2       331       143        60
OIR    2025130    131400   -9.6000 -138.4400      21.0       331       138        60
OIR    2025130    131400   -9.6000 -138.4500      20.9       332       137        60
OIR    2025130    131400   -9.6000 -138.4600      20.7       333       138        60
OIR    2025130    131400   -9.6000 -138.4700      20.6       334       139        60
OIR    2025130    131400   -9.6000 -138.4800      20.6       334       140        60
OIR    2025130    131400   -9.6000 -138.4900      20.6       334       143        60
OIR    2025130    131400   -9.6000 -138.5000      20.6       334       146        60
OIR    2025130    131400   -9.6100 -136.1300      36.7        73       142        60
OIR    2025130    131400   -9.6100 -136.1400      36.7        73       134        60
OIR    2025130    131400   -9.6100 -136.1500      37.8        74       130        60
OIR    2025130    131400   -9.6100 -136.1600      41.0        77       130        60
OIR    2025130    131400   -9.6100 -136.1700      42.2        78       132        60
OIR    2025130    131400   -9.6100 -136.1800      42.5        78       134        60
OIR    2025130    131400   -9.6100 -136.1900      42.6        77       136        60
OIR    2025130    131400   -9.6100 -136.2000      42.6        77       128        60
OIR    2025130    131400   -9.6100 -136.2100      42.6        77       121        60
OIR    2025130    131400   -9.6100 -136.2200      42.5        77       119        60
OIR    2025130    131400   -9.6100 -136.2300      42.5        77       116        60
OIR    2025130    131400   -9.6100 -136.2400      42.5        77       120        60
OIR    2025130    131400   -9.6100 -136.2500      42.4        77       125        60
OIR    2025130    131400   -9.6100 -136.2600      42.0        77       132        60
OIR    2025130    131400   -9.6100 -136.2700      39.7        76       134        60
OIR    2025130    131400   -9.6100 -136.2800      39.1        76       134        60
OIR    2025130    131400   -9.6100 -136.2900      38.9        76       133        60
OIR    2025130    131400   -9.6100 -136.3000      38.8        76       132        60
OIR    2025130    131400   -9.6100 -136.3100      38.7        76       133        60
OIR    2025130    131400   -9.6100 -136.3200      38.4        76       134        60
OIR    2025130    131400   -9.6100 -136.3300      38.3        76       134        60
OIR    2025130    131400   -9.6100 -136.3400      38.3        76       134        60
OIR    2025130    131400   -9.6100 -136.3500      38.2        76       136        60
OIR    2025130    131400   -9.6100 -136.3600      38.2        76       137        60
OIR    2025130    131400   -9.6100 -136.3700      38.2        77       138        60
OIR    2025130    131400   -9.6100 -136.3800      38.1        77       138        60
OIR    2025130    131400   -9.6100 -136.3900      38.0        77       138        60
OIR    2025130    131400   -9.6100 -136.4000      38.0        77       138        60
OIR    2025130    131400   -9.6100 -136.4100      37.7        76       138        60
OIR    2025130    131400   -9.6100 -136.4200      37.6        76       136        60
OIR    2025130    131400   -9.6100 -136.4300      37.7        76       135        60
OIR    2025130    131400   -9.6100 -136.4400      37.7        76       134        60
OIR    2025130    131400   -9.6100 -136.4500      37.6        76       133        60
OIR    2025130    131400   -9.6100 -136.4600      37.4        75       132        60
OIR    2025130    131400   -9.6100 -136.4700      37.3        75       132        60
OIR    2025130    131400   -9.6100 -136.4800      37.2        75       133        60
OIR    2025130    131400   -9.6100 -136.4900      37.1        75       132        60
OIR    2025130    131400   -9.6100 -136.5000      37.1        75       130        60
OIR    2025130    131400   -9.6100 -136.5100      37.2        74       128        60
OIR    2025130    131400   -9.6100 -136.5200      37.2        74       126        60
OIR    2025130    131400   -9.6100 -136.5300      37.2        74       126        60
OIR    2025130    131400   -9.6100 -136.5400      37.1        74       127        60
OIR    2025130    131400   -9.6100 -136.5500      36.7        73       127        60
OIR    2025130    131400   -9.6100 -136.5600      36.4        72       127        60
OIR    2025130    131400   -9.6100 -136.5700      36.4        71       128        60
OIR    2025130    131400   -9.6100 -136.5800      36.3        71       130        60
OIR    2025130    131400   -9.6100 -136.5900      36.1        71       133        60
OIR    2025130    131400   -9.6100 -136.6000      35.9        71       134        60
OIR    2025130    131400   -9.6100 -136.6100      35.3        71       135        60
OIR    2025130    131400   -9.6100 -136.6200      34.7        71       135        60
OIR    2025130    131400   -9.6100 -136.6300      34.1        71       136        60
OIR    2025130    131400   -9.6100 -136.6400      33.0        71       134        60
OIR    2025130    131400   -9.6100 -136.6500      32.3        71       133        60
OIR    2025130    131400   -9.6100 -136.6600      31.5        71       131        60
OIR    2025130    131400   -9.6100 -136.6700      30.8        72       129        60
OIR    2025130    131400   -9.6100 -136.6800      30.4        72       128        60
OIR    2025130    131400   -9.6100 -136.6900      30.1        72       127        60
OIR    2025130    131400   -9.6100 -136.7000      29.9        71       126        60
OIR    2025130    131400   -9.6100 -136.7100      29.6        71       124        60
OIR    2025130    131400   -9.6100 -136.7200      29.4        71       123        60
OIR    2025130    131400   -9.6100 -136.7300      29.1        70       123        60
OIR    2025130    131400   -9.6100 -136.7400      28.9        70       123        60
OIR    2025130    131400   -9.6100 -136.7500      28.6        69       121        60
OIR    2025130    131400   -9.6100 -136.7600      27.7        68       119        60
OIR    2025130    131400   -9.6100 -136.7700      26.9        67       116        60
OIR    2025130    131400   -9.6100 -136.7800      26.7        66       116        60
OIR    2025130    131400   -9.6100 -136.7900      26.7        66       116        60
OIR    2025130    131400   -9.6100 -136.8000      26.6        65       113        60
OIR    2025130    131400   -9.6100 -136.8100      26.7        63       109        60
OIR    2025130    131400   -9.6100 -136.8200      26.9        62       107        60
OIR    2025130    131400   -9.6100 -136.8300      26.9        62       104        60
OIR    2025130    131400   -9.6100 -136.8400      27.0        61       103        60
OIR    2025130    131400   -9.6100 -136.8500      27.0        61       103        60
OIR    2025130    131400   -9.6100 -136.8600      27.0        61       103        60
OIR    2025130    131400   -9.6100 -136.8700      27.1        61       103        60
OIR    2025130    131400   -9.6100 -136.8800      27.1        61       104        60
OIR    2025130    131400   -9.6100 -136.8900      27.1        61       105        60
OIR    2025130    131400   -9.6100 -136.9000      27.1        60       108        60
OIR    2025130    131400   -9.6100 -136.9100      27.1        60       109        60
OIR    2025130    131400   -9.6100 -136.9200      27.1        60       109        60
OIR    2025130    131400   -9.6100 -136.9300      27.1        60       109        60
OIR    2025130    131400   -9.6100 -136.9400      27.2        60       109        60
OIR    2025130    131400   -9.6100 -136.9500      27.3        60       110        60
OIR    2025130    131400   -9.6100 -136.9600      27.3        60       111        60
OIR    2025130    131400   -9.6100 -136.9700      27.4        60       109        60
OIR    2025130    131400   -9.6100 -136.9800      27.6        60       107        60
OIR    2025130    131400   -9.6100 -136.9900      27.8        59       107        60
OIR    2025130    131400   -9.6100 -137.0000      28.2        59       108        60
OIR    2025130    131400   -9.6100 -137.0100      28.9        57       108        60
OIR    2025130    131400   -9.6100 -137.0200      29.5        55       109        60
OIR    2025130    131400   -9.6100 -137.0300      30.2        54       110        60
OIR    2025130    131400   -9.6100 -137.0400      30.7        53       110        60
OIR    2025130    131400   -9.6100 -137.0500      31.1        53       109        60
OIR    2025130    131400   -9.6100 -137.0600      31.6        52       107        60
OIR    2025130    131400   -9.6100 -137.0700      31.9        52       104        60
OIR    2025130    131400   -9.6100 -137.0800      32.2        52       104        60
OIR    2025130    131400   -9.6100 -137.0900      32.4        52       104        60
OIR    2025130    131400   -9.6100 -137.1000      32.5        52       104        60
OIR    2025130    131400   -9.6100 -137.1100      32.7        52       104        60
OIR    2025130    131400   -9.6100 -137.1200      32.9        53       105        60
OIR    2025130    131400   -9.6100 -137.1300      33.0        53       105        60
OIR    2025130    131400   -9.6100 -137.1400      33.1        53       104        60
OIR    2025130    131400   -9.6100 -137.1500      33.1        54       104        60
OIR    2025130    131400   -9.6100 -137.1600      33.1        54       105        60
OIR    2025130    131400   -9.6100 -137.1700      33.2        55       107        60
OIR    2025130    131400   -9.6100 -137.1800      33.3        56       107        60
OIR    2025130    131400   -9.6100 -137.1900      33.2        56       105        60
OIR    2025130    131400   -9.6100 -137.2000      32.9        56       104        60
OIR    2025130    131400   -9.6100 -137.2100      32.5        56       104        60
OIR    2025130    131400   -9.6100 -137.2200      32.2        56       103        60
OIR    2025130    131400   -9.6100 -137.2300      31.7        57       103        60
OIR    2025130    131400   -9.6100 -137.2400      31.3        57       103        60
OIR    2025130    131400   -9.6100 -137.2500      31.0        57       103        60
OIR    2025130    131400   -9.6100 -137.2600      30.7        57       103        60
OIR    2025130    131400   -9.6100 -137.2700      30.4        57       103        60
OIR    2025130    131400   -9.6100 -137.2800      30.2        58       103        60
OIR    2025130    131400   -9.6100 -137.2900      29.8        58       103        60
OIR    2025130    131400   -9.6100 -137.3000      29.6        59       103        60
OIR    2025130    131400   -9.6100 -137.3100      29.5        59       103        60
OIR    2025130    131400   -9.6100 -137.3200      29.4        59       103        60
OIR    2025130    131400   -9.6100 -137.3300      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.3400      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.3700      29.2        59       103        60
OIR    2025130    131400   -9.6100 -137.3800      29.2        59       103        60
OIR    2025130    131400   -9.6100 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6100 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6100 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6100 -137.4900      29.3        59       103        60
OIR    2025130    131400   -9.6100 -137.5000      29.0        57       103        60
OIR    2025130    131400   -9.6100 -137.5100      28.6        54       103        60
OIR    2025130    131400   -9.6100 -137.5200      27.7        44       103        60
OIR    2025130    131400   -9.6100 -137.5300      27.0        36       103        60
OIR    2025130    131400   -9.6100 -137.5400      26.7        31       103        60
OIR    2025130    131400   -9.6100 -137.5500      26.5        27       103        60
OIR    2025130    131400   -9.6100 -137.5600      26.8        26       103        60
OIR    2025130    131400   -9.6100 -137.5700      25.6        24       103        60
OIR    2025130    131400   -9.6100 -137.5800      25.3        25       103        60
OIR    2025130    131400   -9.6100 -137.5900      24.9        28       103        60
OIR    2025130    131400   -9.6100 -137.6000      23.4        32       103        60
OIR    2025130    131400   -9.6100 -137.6100      20.5        30       103        60
OIR    2025130    131400   -9.6100 -137.6200      19.1        25       103        60
OIR    2025130    131400   -9.6100 -137.6300      18.6        20       103        60
OIR    2025130    131400   -9.6100 -137.6400      17.7        14       103        60
OIR    2025130    131400   -9.6100 -137.6500      17.5        11       103        60
OIR    2025130    131400   -9.6100 -137.6600      17.6         9       103        60
OIR    2025130    131400   -9.6100 -137.6700      18.0         3       103        60
OIR    2025130    131400   -9.6100 -137.6800      18.5         1       103        60
OIR    2025130    131400   -9.6100 -137.6900      19.0       359       103        60
OIR    2025130    131400   -9.6100 -137.7000      19.8       357       103        60
OIR    2025130    131400   -9.6100 -137.7100      21.1       355       103        60
OIR    2025130    131400   -9.6100 -137.7200      22.2       352       103        60
OIR    2025130    131400   -9.6100 -137.7300      23.1       352       103        60
OIR    2025130    131400   -9.6100 -137.7400      23.9       352       103        60
OIR    2025130    131400   -9.6100 -137.7500      24.8       352       103        60
OIR    2025130    131400   -9.6100 -137.7600      25.4       353       103        60
OIR    2025130    131400   -9.6100 -137.7700      25.8       353       103        60
OIR    2025130    131400   -9.6100 -137.7800      26.2       353       103        60
OIR    2025130    131400   -9.6100 -137.7900      27.0       353       103        60
OIR    2025130    131400   -9.6100 -137.8000      28.0       353       103        60
OIR    2025130    131400   -9.6100 -137.8100      29.2       354       103        60
OIR    2025130    131400   -9.6100 -137.8200      30.3       355       103        60
OIR    2025130    131400   -9.6100 -137.8300      30.8       356       103        60
OIR    2025130    131400   -9.6100 -137.8400      31.0       356       103        60
OIR    2025130    131400   -9.6100 -137.8500      31.0       356       103        60
OIR    2025130    131400   -9.6100 -137.8600      31.0       356       104        60
OIR    2025130    131400   -9.6100 -137.8700      30.9       355       104        60
OIR    2025130    131400   -9.6100 -137.8800      30.6       354       104        60
OIR    2025130    131400   -9.6100 -137.8900      30.1       352       105        60
OIR    2025130    131400   -9.6100 -137.9000      29.6       348       105        60
OIR    2025130    131400   -9.6100 -137.9100      28.6       344       107        60
OIR    2025130    131400   -9.6100 -137.9200      26.5       337       104        60
OIR    2025130    131400   -9.6100 -137.9300      24.7       328       104        60
OIR    2025130    131400   -9.6100 -137.9400      24.1       326       105        60
OIR    2025130    131400   -9.6100 -137.9500      23.7       324       109        60
OIR    2025130    131400   -9.6100 -137.9600      23.4       323       113        60
OIR    2025130    131400   -9.6100 -137.9700      23.2       323       115        60
OIR    2025130    131400   -9.6100 -137.9800      23.0       323       116        60
OIR    2025130    131400   -9.6100 -137.9900      22.9       323       119        60
OIR    2025130    131400   -9.6100 -138.0000      22.8       323       121        60
OIR    2025130    131400   -9.6100 -138.0100      22.8       323       122        60
OIR    2025130    131400   -9.6100 -138.0200      22.8       323       123        60
OIR    2025130    131400   -9.6100 -138.0300      22.8       323       122        60
OIR    2025130    131400   -9.6100 -138.0400      22.9       322       122        60
OIR    2025130    131400   -9.6100 -138.0500      22.9       322       122        60
OIR    2025130    131400   -9.6100 -138.0600      23.1       322       121        60
OIR    2025130    131400   -9.6100 -138.0700      23.4       322       122        60
OIR    2025130    131400   -9.6100 -138.0800      23.6       322       123        60
OIR    2025130    131400   -9.6100 -138.0900      23.8       322       124        60
OIR    2025130    131400   -9.6100 -138.1000      23.8       322       125        60
OIR    2025130    131400   -9.6100 -138.1100      23.8       322       128        60
OIR    2025130    131400   -9.6100 -138.1200      23.7       322       130        60
OIR    2025130    131400   -9.6100 -138.1300      23.6       321       131        60
OIR    2025130    131400   -9.6100 -138.1400      23.6       321       131        60
OIR    2025130    131400   -9.6100 -138.1500      23.6       321       131        60
OIR    2025130    131400   -9.6100 -138.1600      23.6       321       133        60
OIR    2025130    131400   -9.6100 -138.1700      23.6       321       136        60
OIR    2025130    131400   -9.6100 -138.1800      23.7       322       142        60
OIR    2025130    131400   -9.6100 -138.1900      23.8       322       144        60
OIR    2025130    131400   -9.6100 -138.2000      23.9       322       142        60
OIR    2025130    131400   -9.6100 -138.2100      23.9       322       140        60
OIR    2025130    131400   -9.6100 -138.2200      23.9       322       141        60
OIR    2025130    131400   -9.6100 -138.2300      23.8       323       138        60
OIR    2025130    131400   -9.6100 -138.2400      23.7       323       134        60
OIR    2025130    131400   -9.6100 -138.2500      23.7       324       134        60
OIR    2025130    131400   -9.6100 -138.2600      23.6       324       133        60
OIR    2025130    131400   -9.6100 -138.2700      23.5       325       134        60
OIR    2025130    131400   -9.6100 -138.2800      23.4       325       134        60
OIR    2025130    131400   -9.6100 -138.2900      23.3       326       135        60
OIR    2025130    131400   -9.6100 -138.3000      23.2       326       135        60
OIR    2025130    131400   -9.6100 -138.3100      23.1       327       134        60
OIR    2025130    131400   -9.6100 -138.3200      22.9       328       134        60
OIR    2025130    131400   -9.6100 -138.3300      22.8       328       135        60
OIR    2025130    131400   -9.6100 -138.3400      22.6       329       135        60
OIR    2025130    131400   -9.6100 -138.3500      22.5       329       136        60
OIR    2025130    131400   -9.6100 -138.3600      22.3       329       139        60
OIR    2025130    131400   -9.6100 -138.3700      22.2       329       141        60
OIR    2025130    131400   -9.6100 -138.3800      22.1       330       142        60
OIR    2025130    131400   -9.6100 -138.3900      21.9       330       142        60
OIR    2025130    131400   -9.6100 -138.4000      21.7       330       142        60
OIR    2025130    131400   -9.6100 -138.4100      21.5       330       143        60
OIR    2025130    131400   -9.6100 -138.4200      21.3       331       145        60
OIR    2025130    131400   -9.6100 -138.4300      21.1       331       145        60
OIR    2025130    131400   -9.6100 -138.4400      20.9       332       142        60
OIR    2025130    131400   -9.6100 -138.4500      20.8       332       141        60
OIR    2025130    131400   -9.6100 -138.4600      20.7       333       142        60
OIR    2025130    131400   -9.6100 -138.4700      20.6       334       143        60
OIR    2025130    131400   -9.6100 -138.4800      20.6       334       144        60
OIR    2025130    131400   -9.6100 -138.4900      20.6       334       147        60
OIR    2025130    131400   -9.6200 -136.1300      36.7        73       141        60
OIR    2025130    131400   -9.6200 -136.1400      36.8        73       134        60
OIR    2025130    131400   -9.6200 -136.1500      38.9        76       132        60
OIR    2025130    131400   -9.6200 -136.1600      42.2        78       133        60
OIR    2025130    131400   -9.6200 -136.1700      42.8        78       136        60
OIR    2025130    131400   -9.6200 -136.1800      42.8        78       140        60
OIR    2025130    131400   -9.6200 -136.1900      42.6        77       144        60
OIR    2025130    131400   -9.6200 -136.2000      42.6        77       132        60
OIR    2025130    131400   -9.6200 -136.2100      42.6        77       122        60
OIR    2025130    131400   -9.6200 -136.2200      42.6        77       116        60
OIR    2025130    131400   -9.6200 -136.2300      42.6        77       112        60
OIR    2025130    131400   -9.6200 -136.2400      42.6        77       114        60
OIR    2025130    131400   -9.6200 -136.2500      42.5        77       120        60
OIR    2025130    131400   -9.6200 -136.2600      42.4        77       131        60
OIR    2025130    131400   -9.6200 -136.2700      41.1        77       133        60
OIR    2025130    131400   -9.6200 -136.2800      39.9        76       132        60
OIR    2025130    131400   -9.6200 -136.2900      39.1        76       132        60
OIR    2025130    131400   -9.6200 -136.3000      38.9        76       130        60
OIR    2025130    131400   -9.6200 -136.3100      38.8        76       130        60
OIR    2025130    131400   -9.6200 -136.3200      38.4        76       130        60
OIR    2025130    131400   -9.6200 -136.3300      38.4        76       131        60
OIR    2025130    131400   -9.6200 -136.3400      38.3        76       132        60
OIR    2025130    131400   -9.6200 -136.3500      38.3        76       134        60
OIR    2025130    131400   -9.6200 -136.3600      38.3        76       136        60
OIR    2025130    131400   -9.6200 -136.3700      38.3        76       136        60
OIR    2025130    131400   -9.6200 -136.3800      38.2        76       136        60
OIR    2025130    131400   -9.6200 -136.3900      38.1        76       136        60
OIR    2025130    131400   -9.6200 -136.4000      37.9        76       136        60
OIR    2025130    131400   -9.6200 -136.4100      37.6        76       137        60
OIR    2025130    131400   -9.6200 -136.4200      37.6        76       135        60
OIR    2025130    131400   -9.6200 -136.4300      37.6        76       133        60
OIR    2025130    131400   -9.6200 -136.4400      37.6        76       132        60
OIR    2025130    131400   -9.6200 -136.4500      37.5        75       131        60
OIR    2025130    131400   -9.6200 -136.4600      37.4        75       130        60
OIR    2025130    131400   -9.6200 -136.4700      37.3        75       130        60
OIR    2025130    131400   -9.6200 -136.4800      37.2        75       131        60
OIR    2025130    131400   -9.6200 -136.4900      37.1        75       131        60
OIR    2025130    131400   -9.6200 -136.5000      37.1        74       130        60
OIR    2025130    131400   -9.6200 -136.5100      37.1        74       129        60
OIR    2025130    131400   -9.6200 -136.5200      37.1        74       126        60
OIR    2025130    131400   -9.6200 -136.5300      37.1        74       127        60
OIR    2025130    131400   -9.6200 -136.5400      37.0        74       127        60
OIR    2025130    131400   -9.6200 -136.5500      36.5        72       126        60
OIR    2025130    131400   -9.6200 -136.5600      36.3        72       126        60
OIR    2025130    131400   -9.6200 -136.5700      36.3        71       127        60
OIR    2025130    131400   -9.6200 -136.5800      36.1        71       129        60
OIR    2025130    131400   -9.6200 -136.5900      35.8        71       131        60
OIR    2025130    131400   -9.6200 -136.6000      35.3        71       132        60
OIR    2025130    131400   -9.6200 -136.6100      34.8        71       132        60
OIR    2025130    131400   -9.6200 -136.6200      34.6        70       133        60
OIR    2025130    131400   -9.6200 -136.6300      34.4        70       134        60
OIR    2025130    131400   -9.6200 -136.6400      33.8        71       134        60
OIR    2025130    131400   -9.6200 -136.6500      32.9        71       134        60
OIR    2025130    131400   -9.6200 -136.6600      31.8        71       132        60
OIR    2025130    131400   -9.6200 -136.6700      31.0        71       130        60
OIR    2025130    131400   -9.6200 -136.6800      30.7        71       129        60
OIR    2025130    131400   -9.6200 -136.6900      30.5        71       127        60
OIR    2025130    131400   -9.6200 -136.7000      30.2        71       125        60
OIR    2025130    131400   -9.6200 -136.7100      30.0        71       124        60
OIR    2025130    131400   -9.6200 -136.7200      29.7        71       123        60
OIR    2025130    131400   -9.6200 -136.7300      29.5        70       122        60
OIR    2025130    131400   -9.6200 -136.7400      29.4        69       122        60
OIR    2025130    131400   -9.6200 -136.7500      29.2        69       119        60
OIR    2025130    131400   -9.6200 -136.7600      28.5        68       116        60
OIR    2025130    131400   -9.6200 -136.7700      27.6        67       116        60
OIR    2025130    131400   -9.6200 -136.7800      27.2        66       116        60
OIR    2025130    131400   -9.6200 -136.7900      26.9        65       116        60
OIR    2025130    131400   -9.6200 -136.8000      26.8        64       115        60
OIR    2025130    131400   -9.6200 -136.8100      26.8        63       110        60
OIR    2025130    131400   -9.6200 -136.8200      26.9        62       107        60
OIR    2025130    131400   -9.6200 -136.8300      27.0        61       104        60
OIR    2025130    131400   -9.6200 -136.8400      27.0        61       104        60
OIR    2025130    131400   -9.6200 -136.8500      27.0        61       103        60
OIR    2025130    131400   -9.6200 -136.8600      27.0        61       103        60
OIR    2025130    131400   -9.6200 -136.8700      27.1        60       103        60
OIR    2025130    131400   -9.6200 -136.8800      27.1        60       104        60
OIR    2025130    131400   -9.6200 -136.8900      27.1        60       105        60
OIR    2025130    131400   -9.6200 -136.9000      27.1        60       107        60
OIR    2025130    131400   -9.6200 -136.9100      27.1        60       109        60
OIR    2025130    131400   -9.6200 -136.9200      27.1        60       109        60
OIR    2025130    131400   -9.6200 -136.9300      27.1        60       109        60
OIR    2025130    131400   -9.6200 -136.9400      27.2        60       109        60
OIR    2025130    131400   -9.6200 -136.9500      27.2        60       110        60
OIR    2025130    131400   -9.6200 -136.9600      27.3        60       111        60
OIR    2025130    131400   -9.6200 -136.9700      27.4        60       109        60
OIR    2025130    131400   -9.6200 -136.9800      27.5        59       108        60
OIR    2025130    131400   -9.6200 -136.9900      27.8        59       108        60
OIR    2025130    131400   -9.6200 -137.0000      28.3        57       108        60
OIR    2025130    131400   -9.6200 -137.0100      29.0        55       108        60
OIR    2025130    131400   -9.6200 -137.0200      29.7        53       108        60
OIR    2025130    131400   -9.6200 -137.0300      30.4        52       109        60
OIR    2025130    131400   -9.6200 -137.0400      30.8        52       109        60
OIR    2025130    131400   -9.6200 -137.0500      31.2        51       108        60
OIR    2025130    131400   -9.6200 -137.0600      31.5        51       107        60
OIR    2025130    131400   -9.6200 -137.0700      31.9        51       105        60
OIR    2025130    131400   -9.6200 -137.0800      32.2        51       104        60
OIR    2025130    131400   -9.6200 -137.0900      32.4        52       103        60
OIR    2025130    131400   -9.6200 -137.1000      32.6        52       103        60
OIR    2025130    131400   -9.6200 -137.1100      32.8        52       103        60
OIR    2025130    131400   -9.6200 -137.1200      33.0        52       104        60
OIR    2025130    131400   -9.6200 -137.1300      33.1        52       104        60
OIR    2025130    131400   -9.6200 -137.1400      33.2        52       104        60
OIR    2025130    131400   -9.6200 -137.1500      33.3        53       104        60
OIR    2025130    131400   -9.6200 -137.1600      33.4        53       105        60
OIR    2025130    131400   -9.6200 -137.1700      33.4        54       107        60
OIR    2025130    131400   -9.6200 -137.1800      33.5        54       107        60
OIR    2025130    131400   -9.6200 -137.1900      33.4        55       105        60
OIR    2025130    131400   -9.6200 -137.2000      33.2        55       104        60
OIR    2025130    131400   -9.6200 -137.2100      32.8        55       104        60
OIR    2025130    131400   -9.6200 -137.2200      32.5        56       103        60
OIR    2025130    131400   -9.6200 -137.2300      32.1        56       103        60
OIR    2025130    131400   -9.6200 -137.2400      31.6        56       103        60
OIR    2025130    131400   -9.6200 -137.2500      31.3        56       103        60
OIR    2025130    131400   -9.6200 -137.2600      31.0        56       103        60
OIR    2025130    131400   -9.6200 -137.2700      30.8        57       103        60
OIR    2025130    131400   -9.6200 -137.2800      30.5        57       103        60
OIR    2025130    131400   -9.6200 -137.2900      30.1        58       103        60
OIR    2025130    131400   -9.6200 -137.3000      29.7        58       103        60
OIR    2025130    131400   -9.6200 -137.3100      29.6        59       103        60
OIR    2025130    131400   -9.6200 -137.3200      29.4        59       103        60
OIR    2025130    131400   -9.6200 -137.3300      29.4        59       103        60
OIR    2025130    131400   -9.6200 -137.3400      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6200 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6200 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6200 -137.4900      29.3        59       103        60
OIR    2025130    131400   -9.6200 -137.5000      28.9        57       103        60
OIR    2025130    131400   -9.6200 -137.5100      28.5        55       103        60
OIR    2025130    131400   -9.6200 -137.5200      27.7        46       103        60
OIR    2025130    131400   -9.6200 -137.5300      27.7        37       103        60
OIR    2025130    131400   -9.6200 -137.5400      27.6        30       103        60
OIR    2025130    131400   -9.6200 -137.5500      30.9        13       103        60
OIR    2025130    131400   -9.6200 -137.5600      46.5       359       103        60
OIR    2025130    131400   -9.6200 -137.5700      45.3         1       103        60
OIR    2025130    131400   -9.6200 -137.5800      37.3        14       103        60
OIR    2025130    131400   -9.6200 -137.5900      30.2        32       103        60
OIR    2025130    131400   -9.6200 -137.6000      28.1        41       103        60
OIR    2025130    131400   -9.6200 -137.6100      22.3        38       103        60
OIR    2025130    131400   -9.6200 -137.6200      19.4        29       103        60
OIR    2025130    131400   -9.6200 -137.6300      18.2        24       103        60
OIR    2025130    131400   -9.6200 -137.6400      17.2        18       103        60
OIR    2025130    131400   -9.6200 -137.6500      16.7        14       103        60
OIR    2025130    131400   -9.6200 -137.6600      16.9        11       103        60
OIR    2025130    131400   -9.6200 -137.6700      17.8         4       103        60
OIR    2025130    131400   -9.6200 -137.6800      18.4         2       103        60
OIR    2025130    131400   -9.6200 -137.6900      19.1       360       103        60
OIR    2025130    131400   -9.6200 -137.7000      19.9       358       103        60
OIR    2025130    131400   -9.6200 -137.7100      21.0       356       103        60
OIR    2025130    131400   -9.6200 -137.7200      22.2       354       103        60
OIR    2025130    131400   -9.6200 -137.7300      23.0       353       103        60
OIR    2025130    131400   -9.6200 -137.7400      23.9       352       103        60
OIR    2025130    131400   -9.6200 -137.7500      24.8       352       103        60
OIR    2025130    131400   -9.6200 -137.7600      25.5       353       103        60
OIR    2025130    131400   -9.6200 -137.7700      26.0       353       103        60
OIR    2025130    131400   -9.6200 -137.7800      26.7       353       103        60
OIR    2025130    131400   -9.6200 -137.7900      27.8       354       103        60
OIR    2025130    131400   -9.6200 -137.8000      29.1       354       103        60
OIR    2025130    131400   -9.6200 -137.8100      30.2       355       103        60
OIR    2025130    131400   -9.6200 -137.8200      30.9       356       103        60
OIR    2025130    131400   -9.6200 -137.8300      31.1       356       103        60
OIR    2025130    131400   -9.6200 -137.8400      31.2       356       103        60
OIR    2025130    131400   -9.6200 -137.8500      31.2       356       103        60
OIR    2025130    131400   -9.6200 -137.8600      31.2       356       103        60
OIR    2025130    131400   -9.6200 -137.8700      31.0       355       104        60
OIR    2025130    131400   -9.6200 -137.8800      30.8       355       104        60
OIR    2025130    131400   -9.6200 -137.8900      30.4       353       107        60
OIR    2025130    131400   -9.6200 -137.9000      29.8       351       108        60
OIR    2025130    131400   -9.6200 -137.9100      29.1       348       107        60
OIR    2025130    131400   -9.6200 -137.9200      27.5       343       104        60
OIR    2025130    131400   -9.6200 -137.9300      25.3       331       103        60
OIR    2025130    131400   -9.6200 -137.9400      24.6       328       105        60
OIR    2025130    131400   -9.6200 -137.9500      24.1       326       109        60
OIR    2025130    131400   -9.6200 -137.9600      23.7       325       113        60
OIR    2025130    131400   -9.6200 -137.9700      23.4       324       116        60
OIR    2025130    131400   -9.6200 -137.9800      23.2       323       119        60
OIR    2025130    131400   -9.6200 -137.9900      23.0       323       121        60
OIR    2025130    131400   -9.6200 -138.0000      22.9       323       123        60
OIR    2025130    131400   -9.6200 -138.0100      22.9       323       123        60
OIR    2025130    131400   -9.6200 -138.0200      22.9       323       123        60
OIR    2025130    131400   -9.6200 -138.0300      22.9       323       123        60
OIR    2025130    131400   -9.6200 -138.0400      22.9       323       124        60
OIR    2025130    131400   -9.6200 -138.0500      23.1       323       123        60
OIR    2025130    131400   -9.6200 -138.0600      23.3       322       122        60
OIR    2025130    131400   -9.6200 -138.0700      23.6       323       123        60
OIR    2025130    131400   -9.6200 -138.0800      24.0       323       124        60
OIR    2025130    131400   -9.6200 -138.0900      24.1       323       126        60
OIR    2025130    131400   -9.6200 -138.1000      24.1       323       129        60
OIR    2025130    131400   -9.6200 -138.1100      24.0       323       132        60
OIR    2025130    131400   -9.6200 -138.1200      23.9       322       133        60
OIR    2025130    131400   -9.6200 -138.1300      23.7       322       132        60
OIR    2025130    131400   -9.6200 -138.1400      23.7       322       132        60
OIR    2025130    131400   -9.6200 -138.1500      23.6       322       132        60
OIR    2025130    131400   -9.6200 -138.1600      23.6       322       134        60
OIR    2025130    131400   -9.6200 -138.1700      23.7       322       137        60
OIR    2025130    131400   -9.6200 -138.1800      23.7       323       141        60
OIR    2025130    131400   -9.6200 -138.1900      23.8       323       143        60
OIR    2025130    131400   -9.6200 -138.2000      23.8       323       141        60
OIR    2025130    131400   -9.6200 -138.2100      23.9       323       139        60
OIR    2025130    131400   -9.6200 -138.2200      23.9       323       138        60
OIR    2025130    131400   -9.6200 -138.2300      23.9       323       136        60
OIR    2025130    131400   -9.6200 -138.2400      23.8       324       134        60
OIR    2025130    131400   -9.6200 -138.2500      23.7       324       134        60
OIR    2025130    131400   -9.6200 -138.2600      23.6       325       134        60
OIR    2025130    131400   -9.6200 -138.2700      23.5       325       134        60
OIR    2025130    131400   -9.6200 -138.2800      23.5       326       134        60
OIR    2025130    131400   -9.6200 -138.2900      23.4       326       135        60
OIR    2025130    131400   -9.6200 -138.3000      23.3       327       134        60
OIR    2025130    131400   -9.6200 -138.3100      23.2       327       134        60
OIR    2025130    131400   -9.6200 -138.3200      23.0       328       133        60
OIR    2025130    131400   -9.6200 -138.3300      22.9       329       134        60
OIR    2025130    131400   -9.6200 -138.3400      22.7       329       135        60
OIR    2025130    131400   -9.6200 -138.3500      22.6       329       136        60
OIR    2025130    131400   -9.6200 -138.3600      22.4       330       139        60
OIR    2025130    131400   -9.6200 -138.3700      22.3       330       142        60
OIR    2025130    131400   -9.6200 -138.3800      22.2       330       143        60
OIR    2025130    131400   -9.6200 -138.3900      22.0       330       143        60
OIR    2025130    131400   -9.6200 -138.4000      21.8       331       145        60
OIR    2025130    131400   -9.6200 -138.4100      21.5       331       146        60
OIR    2025130    131400   -9.6200 -138.4200      21.3       331       147        60
OIR    2025130    131400   -9.6200 -138.4300      21.0       332       147        60
OIR    2025130    131400   -9.6200 -138.4400      20.9       333       146        60
OIR    2025130    131400   -9.6200 -138.4500      20.8       333       146        60
OIR    2025130    131400   -9.6200 -138.4600      20.6       334       146        60
OIR    2025130    131400   -9.6200 -138.4700      20.6       334       147        60
OIR    2025130    131400   -9.6300 -136.1300      36.7        74       142        60
OIR    2025130    131400   -9.6300 -136.1400      37.5        75       138        60
OIR    2025130    131400   -9.6300 -136.1500      41.1        78       139        60
OIR    2025130    131400   -9.6300 -136.1600      42.9        79       141        60
OIR    2025130    131400   -9.6300 -136.1700      43.0        79       144        60
OIR    2025130    131400   -9.6300 -136.1800      42.9        78       143        60
OIR    2025130    131400   -9.6300 -136.1900      42.7        77       143        60
OIR    2025130    131400   -9.6300 -136.2000      42.6        77       133        60
OIR    2025130    131400   -9.6300 -136.2100      42.6        77       124        60
OIR    2025130    131400   -9.6300 -136.2200      42.6        77       116        60
OIR    2025130    131400   -9.6300 -136.2300      42.6        77       111        60
OIR    2025130    131400   -9.6300 -136.2400      42.6        77       116        60
OIR    2025130    131400   -9.6300 -136.2500      42.5        77       122        60
OIR    2025130    131400   -9.6300 -136.2600      42.5        77       130        60
OIR    2025130    131400   -9.6300 -136.2700      41.9        77       132        60
OIR    2025130    131400   -9.6300 -136.2800      40.8        76       132        60
OIR    2025130    131400   -9.6300 -136.2900      39.3        76       131        60
OIR    2025130    131400   -9.6300 -136.3000      39.1        76       129        60
OIR    2025130    131400   -9.6300 -136.3100      38.9        76       129        60
OIR    2025130    131400   -9.6300 -136.3200      38.5        76       129        60
OIR    2025130    131400   -9.6300 -136.3300      38.4        76       130        60
OIR    2025130    131400   -9.6300 -136.3400      38.4        76       131        60
OIR    2025130    131400   -9.6300 -136.3500      38.3        76       135        60
OIR    2025130    131400   -9.6300 -136.3600      38.3        76       136        60
OIR    2025130    131400   -9.6300 -136.3700      38.3        76       135        60
OIR    2025130    131400   -9.6300 -136.3800      38.3        76       134        60
OIR    2025130    131400   -9.6300 -136.3900      38.2        76       134        60
OIR    2025130    131400   -9.6300 -136.4000      37.8        76       135        60
OIR    2025130    131400   -9.6300 -136.4100      37.6        76       137        60
OIR    2025130    131400   -9.6300 -136.4200      37.6        76       135        60
OIR    2025130    131400   -9.6300 -136.4300      37.5        76       132        60
OIR    2025130    131400   -9.6300 -136.4400      37.5        75       131        60
OIR    2025130    131400   -9.6300 -136.4500      37.4        75       130        60
OIR    2025130    131400   -9.6300 -136.4600      37.3        75       129        60
OIR    2025130    131400   -9.6300 -136.4700      37.2        75       129        60
OIR    2025130    131400   -9.6300 -136.4800      37.1        75       129        60
OIR    2025130    131400   -9.6300 -136.4900      37.0        75       129        60
OIR    2025130    131400   -9.6300 -136.5000      37.0        74       131        60
OIR    2025130    131400   -9.6300 -136.5100      37.0        74       130        60
OIR    2025130    131400   -9.6300 -136.5200      37.0        74       129        60
OIR    2025130    131400   -9.6300 -136.5300      36.9        74       128        60
OIR    2025130    131400   -9.6300 -136.5400      36.7        73       128        60
OIR    2025130    131400   -9.6300 -136.5500      36.2        72       128        60
OIR    2025130    131400   -9.6300 -136.5600      35.8        71       128        60
OIR    2025130    131400   -9.6300 -136.5700      35.3        70       129        60
OIR    2025130    131400   -9.6300 -136.5800      35.0        70       129        60
OIR    2025130    131400   -9.6300 -136.5900      34.8        70       130        60
OIR    2025130    131400   -9.6300 -136.6000      34.6        70       130        60
OIR    2025130    131400   -9.6300 -136.6100      34.5        70       131        60
OIR    2025130    131400   -9.6300 -136.6200      34.5        70       132        60
OIR    2025130    131400   -9.6300 -136.6300      34.4        70       133        60
OIR    2025130    131400   -9.6300 -136.6400      34.2        70       134        60
OIR    2025130    131400   -9.6300 -136.6500      33.4        71       135        60
OIR    2025130    131400   -9.6300 -136.6600      32.1        71       133        60
OIR    2025130    131400   -9.6300 -136.6700      31.3        71       131        60
OIR    2025130    131400   -9.6300 -136.6800      30.9        71       129        60
OIR    2025130    131400   -9.6300 -136.6900      30.7        71       127        60
OIR    2025130    131400   -9.6300 -136.7000      30.5        71       125        60
OIR    2025130    131400   -9.6300 -136.7100      30.3        71       124        60
OIR    2025130    131400   -9.6300 -136.7200      30.1        70       124        60
OIR    2025130    131400   -9.6300 -136.7300      29.9        70       123        60
OIR    2025130    131400   -9.6300 -136.7400      29.7        69       123        60
OIR    2025130    131400   -9.6300 -136.7500      29.5        69       117        60
OIR    2025130    131400   -9.6300 -136.7600      29.1        68       116        60
OIR    2025130    131400   -9.6300 -136.7700      28.2        66       116        60
OIR    2025130    131400   -9.6300 -136.7800      27.9        65       117        60
OIR    2025130    131400   -9.6300 -136.7900      27.4        64       117        60
OIR    2025130    131400   -9.6300 -136.8000      27.1        63       116        60
OIR    2025130    131400   -9.6300 -136.8100      27.0        62       111        60
OIR    2025130    131400   -9.6300 -136.8200      27.0        62       108        60
OIR    2025130    131400   -9.6300 -136.8300      27.0        61       104        60
OIR    2025130    131400   -9.6300 -136.8400      27.0        61       104        60
OIR    2025130    131400   -9.6300 -136.8500      27.1        61       104        60
OIR    2025130    131400   -9.6300 -136.8600      27.1        60       103        60
OIR    2025130    131400   -9.6300 -136.8700      27.1        60       103        60
OIR    2025130    131400   -9.6300 -136.8800      27.1        60       104        60
OIR    2025130    131400   -9.6300 -136.8900      27.1        60       104        60
OIR    2025130    131400   -9.6300 -136.9000      27.1        60       107        60
OIR    2025130    131400   -9.6300 -136.9100      27.1        60       109        60
OIR    2025130    131400   -9.6300 -136.9200      27.1        60       111        60
OIR    2025130    131400   -9.6300 -136.9300      27.1        60       110        60
OIR    2025130    131400   -9.6300 -136.9400      27.1        60       109        60
OIR    2025130    131400   -9.6300 -136.9500      27.2        60       110        60
OIR    2025130    131400   -9.6300 -136.9600      27.3        60       112        60
OIR    2025130    131400   -9.6300 -136.9700      27.3        59       111        60
OIR    2025130    131400   -9.6300 -136.9800      27.5        58       111        60
OIR    2025130    131400   -9.6300 -136.9900      27.9        57       111        60
OIR    2025130    131400   -9.6300 -137.0000      28.6        55       111        60
OIR    2025130    131400   -9.6300 -137.0100      29.4        52       110        60
OIR    2025130    131400   -9.6300 -137.0200      29.9        51       109        60
OIR    2025130    131400   -9.6300 -137.0300      30.4        51       108        60
OIR    2025130    131400   -9.6300 -137.0400      30.8        51       107        60
OIR    2025130    131400   -9.6300 -137.0500      31.2        51       107        60
OIR    2025130    131400   -9.6300 -137.0600      31.5        51       105        60
OIR    2025130    131400   -9.6300 -137.0700      31.8        51       105        60
OIR    2025130    131400   -9.6300 -137.0800      32.1        51       104        60
OIR    2025130    131400   -9.6300 -137.0900      32.4        51       103        60
OIR    2025130    131400   -9.6300 -137.1000      32.7        51       103        60
OIR    2025130    131400   -9.6300 -137.1100      32.9        51       103        60
OIR    2025130    131400   -9.6300 -137.1200      33.1        51       104        60
OIR    2025130    131400   -9.6300 -137.1300      33.2        52       104        60
OIR    2025130    131400   -9.6300 -137.1400      33.3        52       104        60
OIR    2025130    131400   -9.6300 -137.1500      33.4        52       104        60
OIR    2025130    131400   -9.6300 -137.1600      33.5        53       105        60
OIR    2025130    131400   -9.6300 -137.1700      33.6        53       107        60
OIR    2025130    131400   -9.6300 -137.1800      33.6        54       109        60
OIR    2025130    131400   -9.6300 -137.1900      33.6        54       107        60
OIR    2025130    131400   -9.6300 -137.2000      33.4        54       105        60
OIR    2025130    131400   -9.6300 -137.2100      33.1        54       104        60
OIR    2025130    131400   -9.6300 -137.2200      32.8        55       103        60
OIR    2025130    131400   -9.6300 -137.2300      32.6        55       103        60
OIR    2025130    131400   -9.6300 -137.2400      32.1        55       103        60
OIR    2025130    131400   -9.6300 -137.2500      31.7        55       103        60
OIR    2025130    131400   -9.6300 -137.2600      31.4        56       103        60
OIR    2025130    131400   -9.6300 -137.2700      31.2        56       103        60
OIR    2025130    131400   -9.6300 -137.2800      31.0        56       103        60
OIR    2025130    131400   -9.6300 -137.2900      30.6        57       103        60
OIR    2025130    131400   -9.6300 -137.3000      30.0        58       103        60
OIR    2025130    131400   -9.6300 -137.3100      29.7        58       103        60
OIR    2025130    131400   -9.6300 -137.3200      29.5        59       103        60
OIR    2025130    131400   -9.6300 -137.3300      29.4        59       103        60
OIR    2025130    131400   -9.6300 -137.3400      29.4        59       103        60
OIR    2025130    131400   -9.6300 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6300 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6300 -137.4800      29.3        59       103        60
OIR    2025130    131400   -9.6300 -137.4900      29.2        58       103        60
OIR    2025130    131400   -9.6300 -137.5000      28.8        57       103        60
OIR    2025130    131400   -9.6300 -137.5100      28.2        55       103        60
OIR    2025130    131400   -9.6300 -137.5200      27.5        50       103        60
OIR    2025130    131400   -9.6300 -137.5300      27.5        42       103        60
OIR    2025130    131400   -9.6300 -137.5400      28.4        29       103        60
OIR    2025130    131400   -9.6300 -137.5500      51.3       350       103        60
OIR    2025130    131400   -9.6300 -137.5600      68.4       341       103        60
OIR    2025130    131400   -9.6300 -137.5900      66.6        47       103        60
OIR    2025130    131400   -9.6300 -137.6000      47.9        64       103        60
OIR    2025130    131400   -9.6300 -137.6100      25.6        59       103        60
OIR    2025130    131400   -9.6300 -137.6200      18.3        43       103        60
OIR    2025130    131400   -9.6300 -137.6300      16.4        36       103        60
OIR    2025130    131400   -9.6300 -137.6400      15.3        30       103        60
OIR    2025130    131400   -9.6300 -137.6500      15.1        20       103        60
OIR    2025130    131400   -9.6300 -137.6600      16.2        12       103        60
OIR    2025130    131400   -9.6300 -137.6700      17.9         6       103        60
OIR    2025130    131400   -9.6300 -137.6800      18.6         3       103        60
OIR    2025130    131400   -9.6300 -137.6900      19.3         1       103        60
OIR    2025130    131400   -9.6300 -137.7000      20.1       359       103        60
OIR    2025130    131400   -9.6300 -137.7100      21.1       357       103        60
OIR    2025130    131400   -9.6300 -137.7200      22.2       356       103        60
OIR    2025130    131400   -9.6300 -137.7300      23.2       355       103        60
OIR    2025130    131400   -9.6300 -137.7400      24.1       354       103        60
OIR    2025130    131400   -9.6300 -137.7500      25.1       353       103        60
OIR    2025130    131400   -9.6300 -137.7600      25.8       353       103        60
OIR    2025130    131400   -9.6300 -137.7700      26.6       353       103        60
OIR    2025130    131400   -9.6300 -137.7800      27.7       354       103        60
OIR    2025130    131400   -9.6300 -137.7900      29.1       355       103        60
OIR    2025130    131400   -9.6300 -137.8000      30.3       356       103        60
OIR    2025130    131400   -9.6300 -137.8100      30.9       356       103        60
OIR    2025130    131400   -9.6300 -137.8200      31.3       356       103        60
OIR    2025130    131400   -9.6300 -137.8300      31.4       356       103        60
OIR    2025130    131400   -9.6300 -137.8400      31.4       356       103        60
OIR    2025130    131400   -9.6300 -137.8500      31.4       356       103        60
OIR    2025130    131400   -9.6300 -137.8600      31.4       356       103        60
OIR    2025130    131400   -9.6300 -137.8700      31.2       356       103        60
OIR    2025130    131400   -9.6300 -137.8800      30.9       355       104        60
OIR    2025130    131400   -9.6300 -137.8900      30.6       354       108        60
OIR    2025130    131400   -9.6300 -137.9000      30.0       352       108        60
OIR    2025130    131400   -9.6300 -137.9100      29.5       350       108        60
OIR    2025130    131400   -9.6300 -137.9200      28.4       347       105        60
OIR    2025130    131400   -9.6300 -137.9300      26.2       334       104        60
OIR    2025130    131400   -9.6300 -137.9400      25.2       330       104        60
OIR    2025130    131400   -9.6300 -137.9500      24.6       328       109        60
OIR    2025130    131400   -9.6300 -137.9600      24.2       326       115        60
OIR    2025130    131400   -9.6300 -137.9700      23.8       325       119        60
OIR    2025130    131400   -9.6300 -137.9800      23.5       324       122        60
OIR    2025130    131400   -9.6300 -137.9900      23.3       324       124        60
OIR    2025130    131400   -9.6300 -138.0000      23.2       324       124        60
OIR    2025130    131400   -9.6300 -138.0100      23.1       324       124        60
OIR    2025130    131400   -9.6300 -138.0200      23.0       323       124        60
OIR    2025130    131400   -9.6300 -138.0300      23.0       323       125        60
OIR    2025130    131400   -9.6300 -138.0400      23.0       323       126        60
OIR    2025130    131400   -9.6300 -138.0500      23.2       323       125        60
OIR    2025130    131400   -9.6300 -138.0600      23.5       323       124        60
OIR    2025130    131400   -9.6300 -138.0700      23.9       323       125        60
OIR    2025130    131400   -9.6300 -138.0800      24.2       324       127        60
OIR    2025130    131400   -9.6300 -138.0900      24.3       324       130        60
OIR    2025130    131400   -9.6300 -138.1000      24.3       323       133        60
OIR    2025130    131400   -9.6300 -138.1100      24.2       323       137        60
OIR    2025130    131400   -9.6300 -138.1200      24.0       323       136        60
OIR    2025130    131400   -9.6300 -138.1300      23.9       323       134        60
OIR    2025130    131400   -9.6300 -138.1400      23.8       323       134        60
OIR    2025130    131400   -9.6300 -138.1500      23.7       323       134        60
OIR    2025130    131400   -9.6300 -138.1600      23.8       323       136        60
OIR    2025130    131400   -9.6300 -138.1700      23.8       323       138        60
OIR    2025130    131400   -9.6300 -138.1800      23.8       323       140        60
OIR    2025130    131400   -9.6300 -138.1900      23.8       323       141        60
OIR    2025130    131400   -9.6300 -138.2000      23.9       323       140        60
OIR    2025130    131400   -9.6300 -138.2100      23.9       324       138        60
OIR    2025130    131400   -9.6300 -138.2200      23.9       324       136        60
OIR    2025130    131400   -9.6300 -138.2300      23.9       324       135        60
OIR    2025130    131400   -9.6300 -138.2400      23.8       324       135        60
OIR    2025130    131400   -9.6300 -138.2500      23.8       324       134        60
OIR    2025130    131400   -9.6300 -138.2600      23.7       325       134        60
OIR    2025130    131400   -9.6300 -138.2700      23.6       325       134        60
OIR    2025130    131400   -9.6300 -138.2800      23.5       326       135        60
OIR    2025130    131400   -9.6300 -138.2900      23.5       326       135        60
OIR    2025130    131400   -9.6300 -138.3000      23.4       327       134        60
OIR    2025130    131400   -9.6300 -138.3100      23.3       328       133        60
OIR    2025130    131400   -9.6300 -138.3200      23.2       328       133        60
OIR    2025130    131400   -9.6300 -138.3300      23.0       329       133        60
OIR    2025130    131400   -9.6300 -138.3400      22.9       329       135        60
OIR    2025130    131400   -9.6300 -138.3500      22.8       330       137        60
OIR    2025130    131400   -9.6300 -138.3600      22.6       330       140        60
OIR    2025130    131400   -9.6300 -138.3700      22.4       330       143        60
OIR    2025130    131400   -9.6300 -138.3800      22.2       331       144        60
OIR    2025130    131400   -9.6300 -138.3900      22.0       331       146        60
OIR    2025130    131400   -9.6400 -136.0300      43.5        78       147        60
OIR    2025130    131400   -9.6400 -136.0400      43.3        78       147        60
OIR    2025130    131400   -9.6400 -136.1200      37.9        74       146        60
OIR    2025130    131400   -9.6400 -136.1300      37.6        74       141        60
OIR    2025130    131400   -9.6400 -136.1400      39.7        77       140        60
OIR    2025130    131400   -9.6400 -136.1500      42.3        79       146        60
OIR    2025130    131400   -9.6400 -136.1800      42.8        78       144        60
OIR    2025130    131400   -9.6400 -136.1900      42.7        77       139        60
OIR    2025130    131400   -9.6400 -136.2000      42.7        77       130        60
OIR    2025130    131400   -9.6400 -136.2100      42.6        77       123        60
OIR    2025130    131400   -9.6400 -136.2200      42.6        77       116        60
OIR    2025130    131400   -9.6400 -136.2300      42.6        77       112        60
OIR    2025130    131400   -9.6400 -136.2400      42.6        77       116        60
OIR    2025130    131400   -9.6400 -136.2500      42.6        77       122        60
OIR    2025130    131400   -9.6400 -136.2600      42.5        77       129        60
OIR    2025130    131400   -9.6400 -136.2700      42.0        77       131        60
OIR    2025130    131400   -9.6400 -136.2800      41.2        76       132        60
OIR    2025130    131400   -9.6400 -136.2900      39.5        76       130        60
OIR    2025130    131400   -9.6400 -136.3000      39.2        75       128        60
OIR    2025130    131400   -9.6400 -136.3100      39.0        75       128        60
OIR    2025130    131400   -9.6400 -136.3200      38.7        76       128        60
OIR    2025130    131400   -9.6400 -136.3300      38.5        76       130        60
OIR    2025130    131400   -9.6400 -136.3400      38.5        76       131        60
OIR    2025130    131400   -9.6400 -136.3500      38.4        76       134        60
OIR    2025130    131400   -9.6400 -136.3600      38.4        76       135        60
OIR    2025130    131400   -9.6400 -136.3700      38.4        76       134        60
OIR    2025130    131400   -9.6400 -136.3800      38.4        76       133        60
OIR    2025130    131400   -9.6400 -136.3900      38.3        76       133        60
OIR    2025130    131400   -9.6400 -136.4000      37.9        76       134        60
OIR    2025130    131400   -9.6400 -136.4100      37.6        76       137        60
OIR    2025130    131400   -9.6400 -136.4200      37.5        76       134        60
OIR    2025130    131400   -9.6400 -136.4300      37.5        75       132        60
OIR    2025130    131400   -9.6400 -136.4400      37.4        75       131        60
OIR    2025130    131400   -9.6400 -136.4500      37.3        75       130        60
OIR    2025130    131400   -9.6400 -136.4600      37.2        75       129        60
OIR    2025130    131400   -9.6400 -136.4700      37.1        75       128        60
OIR    2025130    131400   -9.6400 -136.4800      37.0        75       127        60
OIR    2025130    131400   -9.6400 -136.4900      37.0        74       128        60
OIR    2025130    131400   -9.6400 -136.5000      37.0        74       130        60
OIR    2025130    131400   -9.6400 -136.5100      36.9        74       130        60
OIR    2025130    131400   -9.6400 -136.5200      36.8        74       130        60
OIR    2025130    131400   -9.6400 -136.5300      36.7        74       129        60
OIR    2025130    131400   -9.6400 -136.5400      36.4        73       129        60
OIR    2025130    131400   -9.6400 -136.5500      35.7        71       129        60
OIR    2025130    131400   -9.6400 -136.5600      35.1        70       129        60
OIR    2025130    131400   -9.6400 -136.5700      34.8        70       129        60
OIR    2025130    131400   -9.6400 -136.5800      34.6        70       129        60
OIR    2025130    131400   -9.6400 -136.5900      34.5        70       128        60
OIR    2025130    131400   -9.6400 -136.6000      34.5        70       128        60
OIR    2025130    131400   -9.6400 -136.6100      34.5        70       129        60
OIR    2025130    131400   -9.6400 -136.6200      34.5        70       129        60
OIR    2025130    131400   -9.6400 -136.6300      34.4        70       130        60
OIR    2025130    131400   -9.6400 -136.6400      34.4        70       133        60
OIR    2025130    131400   -9.6400 -136.6500      34.2        70       134        60
OIR    2025130    131400   -9.6400 -136.6600      33.3        70       133        60
OIR    2025130    131400   -9.6400 -136.6700      31.5        71       132        60
OIR    2025130    131400   -9.6400 -136.6800      31.0        71       129        60
OIR    2025130    131400   -9.6400 -136.6900      30.8        71       127        60
OIR    2025130    131400   -9.6400 -136.7000      30.7        71       125        60
OIR    2025130    131400   -9.6400 -136.7100      30.5        71       125        60
OIR    2025130    131400   -9.6400 -136.7200      30.4        70       125        60
OIR    2025130    131400   -9.6400 -136.7300      30.2        70       124        60
OIR    2025130    131400   -9.6400 -136.7400      29.9        69       123        60
OIR    2025130    131400   -9.6400 -136.7500      29.7        69       117        60
OIR    2025130    131400   -9.6400 -136.7600      29.4        68       115        60
OIR    2025130    131400   -9.6400 -136.7700      28.5        66       116        60
OIR    2025130    131400   -9.6400 -136.7800      28.0        65       117        60
OIR    2025130    131400   -9.6400 -136.7900      27.7        64       117        60
OIR    2025130    131400   -9.6400 -136.8000      27.3        62       116        60
OIR    2025130    131400   -9.6400 -136.8100      27.2        62       111        60
OIR    2025130    131400   -9.6400 -136.8200      27.1        61       109        60
OIR    2025130    131400   -9.6400 -136.8300      27.1        61       105        60
OIR    2025130    131400   -9.6400 -136.8400      27.1        61       104        60
OIR    2025130    131400   -9.6400 -136.8500      27.1        60       104        60
OIR    2025130    131400   -9.6400 -136.8600      27.1        60       103        60
OIR    2025130    131400   -9.6400 -136.8700      27.1        60       103        60
OIR    2025130    131400   -9.6400 -136.8800      27.1        60       103        60
OIR    2025130    131400   -9.6400 -136.8900      27.1        60       104        60
OIR    2025130    131400   -9.6400 -136.9000      27.1        60       105        60
OIR    2025130    131400   -9.6400 -136.9100      27.1        60       108        60
OIR    2025130    131400   -9.6400 -136.9200      27.1        60       110        60
OIR    2025130    131400   -9.6400 -136.9300      27.1        60       109        60
OIR    2025130    131400   -9.6400 -136.9400      27.2        59       108        60
OIR    2025130    131400   -9.6400 -136.9500      27.2        59       109        60
OIR    2025130    131400   -9.6400 -136.9600      27.3        58       111        60
OIR    2025130    131400   -9.6400 -136.9700      27.5        57       112        60
OIR    2025130    131400   -9.6400 -136.9800      27.8        56       112        60
OIR    2025130    131400   -9.6400 -136.9900      28.5        53       112        60
OIR    2025130    131400   -9.6400 -137.0000      29.2        51       112        60
OIR    2025130    131400   -9.6400 -137.0100      29.6        51       110        60
OIR    2025130    131400   -9.6400 -137.0200      30.0        50       109        60
OIR    2025130    131400   -9.6400 -137.0300      30.4        50       107        60
OIR    2025130    131400   -9.6400 -137.0400      30.7        50       105        60
OIR    2025130    131400   -9.6400 -137.0500      31.1        50       105        60
OIR    2025130    131400   -9.6400 -137.0600      31.5        50       105        60
OIR    2025130    131400   -9.6400 -137.0700      31.7        50       104        60
OIR    2025130    131400   -9.6400 -137.0800      32.0        50       104        60
OIR    2025130    131400   -9.6400 -137.0900      32.2        50       103        60
OIR    2025130    131400   -9.6400 -137.1000      32.6        51       103        60
OIR    2025130    131400   -9.6400 -137.1100      32.8        51       103        60
OIR    2025130    131400   -9.6400 -137.1200      33.0        51       103        60
OIR    2025130    131400   -9.6400 -137.1300      33.2        51       103        60
OIR    2025130    131400   -9.6400 -137.1400      33.3        52       103        60
OIR    2025130    131400   -9.6400 -137.1500      33.4        52       104        60
OIR    2025130    131400   -9.6400 -137.1600      33.5        52       104        60
OIR    2025130    131400   -9.6400 -137.1700      33.7        53       107        60
OIR    2025130    131400   -9.6400 -137.1800      33.8        53       108        60
OIR    2025130    131400   -9.6400 -137.1900      33.8        53       107        60
OIR    2025130    131400   -9.6400 -137.2000      33.7        54       105        60
OIR    2025130    131400   -9.6400 -137.2100      33.4        54       104        60
OIR    2025130    131400   -9.6400 -137.2200      33.1        54       103        60
OIR    2025130    131400   -9.6400 -137.2300      32.9        54       103        60
OIR    2025130    131400   -9.6400 -137.2400      32.6        54       103        60
OIR    2025130    131400   -9.6400 -137.2500      32.1        55       103        60
OIR    2025130    131400   -9.6400 -137.2600      31.8        55       103        60
OIR    2025130    131400   -9.6400 -137.2700      31.6        55       103        60
OIR    2025130    131400   -9.6400 -137.2800      31.4        56       103        60
OIR    2025130    131400   -9.6400 -137.2900      31.1        56       103        60
OIR    2025130    131400   -9.6400 -137.3000      30.7        57       103        60
OIR    2025130    131400   -9.6400 -137.3100      30.2        57       103        60
OIR    2025130    131400   -9.6400 -137.3200      29.7        58       103        60
OIR    2025130    131400   -9.6400 -137.3300      29.5        59       103        60
OIR    2025130    131400   -9.6400 -137.3400      29.4        59       103        60
OIR    2025130    131400   -9.6400 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4500      29.3        59       103        60
OIR    2025130    131400   -9.6400 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6400 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6400 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6400 -137.4900      29.0        58       103        60
OIR    2025130    131400   -9.6400 -137.5000      28.6        58       103        60
OIR    2025130    131400   -9.6400 -137.5100      27.7        56       103        60
OIR    2025130    131400   -9.6400 -137.5200      27.1        53       103        60
OIR    2025130    131400   -9.6400 -137.5300      27.2        48       103        60
OIR    2025130    131400   -9.6400 -137.5400      36.2       352       103        60
OIR    2025130    131400   -9.6400 -137.5700      62.3       347       103        60
OIR    2025130    131400   -9.6400 -137.6100      41.2        66       103        60
OIR    2025130    131400   -9.6400 -137.6200      18.2        56       103        60
OIR    2025130    131400   -9.6400 -137.6300      15.3        49       103        60
OIR    2025130    131400   -9.6400 -137.6400      14.5        44       103        60
OIR    2025130    131400   -9.6400 -137.6500      14.0        32       103        60
OIR    2025130    131400   -9.6400 -137.6600      15.6        15       103        60
OIR    2025130    131400   -9.6400 -137.6700      18.3         8       103        60
OIR    2025130    131400   -9.6400 -137.6800      19.5         5       103        60
OIR    2025130    131400   -9.6400 -137.6900      19.9         3       103        60
OIR    2025130    131400   -9.6400 -137.7000      20.6         1       103        60
OIR    2025130    131400   -9.6400 -137.7100      21.5       359       103        60
OIR    2025130    131400   -9.6400 -137.7200      22.5       358       103        60
OIR    2025130    131400   -9.6400 -137.7300      23.5       356       103        60
OIR    2025130    131400   -9.6400 -137.7400      24.5       355       103        60
OIR    2025130    131400   -9.6400 -137.7500      25.6       354       103        60
OIR    2025130    131400   -9.6400 -137.7600      26.6       354       103        60
OIR    2025130    131400   -9.6400 -137.7700      27.7       354       103        60
OIR    2025130    131400   -9.6400 -137.7800      29.0       355       103        60
OIR    2025130    131400   -9.6400 -137.7900      30.1       356       103        60
OIR    2025130    131400   -9.6400 -137.8000      30.9       356       103        60
OIR    2025130    131400   -9.6400 -137.8100      31.3       356       103        60
OIR    2025130    131400   -9.6400 -137.8200      31.5       356       103        60
OIR    2025130    131400   -9.6400 -137.8300      31.5       356       103        60
OIR    2025130    131400   -9.6400 -137.8400      31.5       356       103        60
OIR    2025130    131400   -9.6400 -137.8500      31.5       356       103        60
OIR    2025130    131400   -9.6400 -137.8600      31.5       356       103        60
OIR    2025130    131400   -9.6400 -137.8700      31.4       356       103        60
OIR    2025130    131400   -9.6400 -137.8800      31.2       355       104        60
OIR    2025130    131400   -9.6400 -137.8900      30.8       354       107        60
OIR    2025130    131400   -9.6400 -137.9000      30.4       352       107        60
OIR    2025130    131400   -9.6400 -137.9100      30.0       351       107        60
OIR    2025130    131400   -9.6400 -137.9200      29.2       349       104        60
OIR    2025130    131400   -9.6400 -137.9300      27.3       339       103        60
OIR    2025130    131400   -9.6400 -137.9400      26.0       334       104        60
OIR    2025130    131400   -9.6400 -137.9500      25.2       330       109        60
OIR    2025130    131400   -9.6400 -137.9600      24.7       328       115        60
OIR    2025130    131400   -9.6400 -137.9700      24.1       326       120        60
OIR    2025130    131400   -9.6400 -137.9800      23.8       325       123        60
OIR    2025130    131400   -9.6400 -137.9900      23.7       325       125        60
OIR    2025130    131400   -9.6400 -138.0000      23.5       325       124        60
OIR    2025130    131400   -9.6400 -138.0100      23.3       325       124        60
OIR    2025130    131400   -9.6400 -138.0200      23.2       325       124        60
OIR    2025130    131400   -9.6400 -138.0300      23.1       324       126        60
OIR    2025130    131400   -9.6400 -138.0400      23.3       324       129        60
OIR    2025130    131400   -9.6400 -138.0500      23.5       324       128        60
OIR    2025130    131400   -9.6400 -138.0600      23.8       324       127        60
OIR    2025130    131400   -9.6400 -138.0700      24.2       324       129        60
OIR    2025130    131400   -9.6400 -138.0800      24.3       324       132        60
OIR    2025130    131400   -9.6400 -138.0900      24.4       324       135        60
OIR    2025130    131400   -9.6400 -138.1000      24.4       324       137        60
OIR    2025130    131400   -9.6400 -138.1100      24.3       324       140        60
OIR    2025130    131400   -9.6400 -138.1200      24.1       323       139        60
OIR    2025130    131400   -9.6400 -138.1300      24.0       323       136        60
OIR    2025130    131400   -9.6400 -138.1400      24.0       323       136        60
OIR    2025130    131400   -9.6400 -138.1500      23.9       323       136        60
OIR    2025130    131400   -9.6400 -138.1600      23.9       323       139        60
OIR    2025130    131400   -9.6400 -138.1700      23.9       323       141        60
OIR    2025130    131400   -9.6400 -138.1800      23.9       324       142        60
OIR    2025130    131400   -9.6400 -138.1900      23.9       324       141        60
OIR    2025130    131400   -9.6400 -138.2000      23.9       324       140        60
OIR    2025130    131400   -9.6400 -138.2100      23.9       324       138        60
OIR    2025130    131400   -9.6400 -138.2200      23.9       324       135        60
OIR    2025130    131400   -9.6400 -138.2300      23.9       324       134        60
OIR    2025130    131400   -9.6400 -138.2400      23.9       324       134        60
OIR    2025130    131400   -9.6400 -138.2500      23.8       325       134        60
OIR    2025130    131400   -9.6400 -138.2600      23.8       325       135        60
OIR    2025130    131400   -9.6400 -138.2700      23.7       326       135        60
OIR    2025130    131400   -9.6400 -138.2800      23.6       326       135        60
OIR    2025130    131400   -9.6400 -138.2900      23.5       327       134        60
OIR    2025130    131400   -9.6400 -138.3000      23.5       327       133        60
OIR    2025130    131400   -9.6400 -138.3100      23.4       328       132        60
OIR    2025130    131400   -9.6400 -138.3200      23.3       329       132        60
OIR    2025130    131400   -9.6400 -138.3300      23.2       329       133        60
OIR    2025130    131400   -9.6400 -138.3400      23.1       329       134        60
OIR    2025130    131400   -9.6400 -138.3500      22.9       330       135        60
OIR    2025130    131400   -9.6400 -138.3600      22.6       330       138        60
OIR    2025130    131400   -9.6400 -138.3700      22.5       331       141        60
OIR    2025130    131400   -9.6400 -138.3800      22.3       331       144        60
OIR    2025130    131400   -9.6400 -138.3900      22.2       331       145        60
OIR    2025130    131400   -9.6400 -138.4000      21.9       331       148        60
OIR    2025130    131400   -9.6400 -138.4100      21.6       332       149        60
OIR    2025130    131400   -9.6400 -138.4200      21.3       332       148        60
OIR    2025130    131400   -9.6500 -136.0100      43.5        79       147        60
OIR    2025130    131400   -9.6500 -136.0300      43.3        78       146        60
OIR    2025130    131400   -9.6500 -136.0400      43.2        78       144        60
OIR    2025130    131400   -9.6500 -136.0500      43.2        78       146        60
OIR    2025130    131400   -9.6500 -136.1200      40.6        76       143        60
OIR    2025130    131400   -9.6500 -136.1300      40.5        76       137        60
OIR    2025130    131400   -9.6500 -136.1400      42.5        77       139        60
OIR    2025130    131400   -9.6500 -136.1800      43.0        78       142        60
OIR    2025130    131400   -9.6500 -136.1900      42.8        77       132        60
OIR    2025130    131400   -9.6500 -136.2000      42.7        77       125        60
OIR    2025130    131400   -9.6500 -136.2100      42.6        77       117        60
OIR    2025130    131400   -9.6500 -136.2200      42.6        77       114        60
OIR    2025130    131400   -9.6500 -136.2300      42.6        77       114        60
OIR    2025130    131400   -9.6500 -136.2400      42.6        77       116        60
OIR    2025130    131400   -9.6500 -136.2500      42.6        77       121        60
OIR    2025130    131400   -9.6500 -136.2600      42.5        77       128        60
OIR    2025130    131400   -9.6500 -136.2700      42.0        77       130        60
OIR    2025130    131400   -9.6500 -136.2800      41.2        76       131        60
OIR    2025130    131400   -9.6500 -136.2900      39.6        75       129        60
OIR    2025130    131400   -9.6500 -136.3000      39.4        75       128        60
OIR    2025130    131400   -9.6500 -136.3100      39.2        75       127        60
OIR    2025130    131400   -9.6500 -136.3200      39.0        75       128        60
OIR    2025130    131400   -9.6500 -136.3300      38.9        75       130        60
OIR    2025130    131400   -9.6500 -136.3400      38.7        76       132        60
OIR    2025130    131400   -9.6500 -136.3500      38.5        76       133        60
OIR    2025130    131400   -9.6500 -136.3600      38.7        76       133        60
OIR    2025130    131400   -9.6500 -136.3700      38.8        76       132        60
OIR    2025130    131400   -9.6500 -136.3800      38.7        76       132        60
OIR    2025130    131400   -9.6500 -136.3900      38.5        76       132        60
OIR    2025130    131400   -9.6500 -136.4000      38.0        75       133        60
OIR    2025130    131400   -9.6500 -136.4100      37.6        75       135        60
OIR    2025130    131400   -9.6500 -136.4200      37.6        75       134        60
OIR    2025130    131400   -9.6500 -136.4300      37.5        75       133        60
OIR    2025130    131400   -9.6500 -136.4400      37.4        75       131        60
OIR    2025130    131400   -9.6500 -136.4500      37.3        75       130        60
OIR    2025130    131400   -9.6500 -136.4600      37.2        75       129        60
OIR    2025130    131400   -9.6500 -136.4700      37.1        75       128        60
OIR    2025130    131400   -9.6500 -136.4800      37.0        74       126        60
OIR    2025130    131400   -9.6500 -136.4900      36.9        74       127        60
OIR    2025130    131400   -9.6500 -136.5000      36.8        74       128        60
OIR    2025130    131400   -9.6500 -136.5100      36.7        74       128        60
OIR    2025130    131400   -9.6500 -136.5200      36.5        74       128        60
OIR    2025130    131400   -9.6500 -136.5300      36.3        74       129        60
OIR    2025130    131400   -9.6500 -136.5400      35.9        72       129        60
OIR    2025130    131400   -9.6500 -136.5500      35.1        71       130        60
OIR    2025130    131400   -9.6500 -136.5600      34.7        70       131        60
OIR    2025130    131400   -9.6500 -136.5700      34.6        70       129        60
OIR    2025130    131400   -9.6500 -136.5800      34.5        70       127        60
OIR    2025130    131400   -9.6500 -136.5900      34.5        70       125        60
OIR    2025130    131400   -9.6500 -136.6000      34.5        70       125        60
OIR    2025130    131400   -9.6500 -136.6100      34.5        70       126        60
OIR    2025130    131400   -9.6500 -136.6200      34.4        70       126        60
OIR    2025130    131400   -9.6500 -136.6300      34.4        70       127        60
OIR    2025130    131400   -9.6500 -136.6400      34.4        70       129        60
OIR    2025130    131400   -9.6500 -136.6500      34.4        70       131        60
OIR    2025130    131400   -9.6500 -136.6600      34.1        70       132        60
OIR    2025130    131400   -9.6500 -136.6700      31.6        71       132        60
OIR    2025130    131400   -9.6500 -136.6800      31.2        71       130        60
OIR    2025130    131400   -9.6500 -136.6900      31.0        71       128        60
OIR    2025130    131400   -9.6500 -136.7000      30.8        71       127        60
OIR    2025130    131400   -9.6500 -136.7100      30.7        70       126        60
OIR    2025130    131400   -9.6500 -136.7200      30.6        70       126        60
OIR    2025130    131400   -9.6500 -136.7300      30.4        70       124        60
OIR    2025130    131400   -9.6500 -136.7400      30.2        69       122        60
OIR    2025130    131400   -9.6500 -136.7500      29.9        69       117        60
OIR    2025130    131400   -9.6500 -136.7600      29.5        68       116        60
OIR    2025130    131400   -9.6500 -136.7700      28.6        66       116        60
OIR    2025130    131400   -9.6500 -136.7800      28.1        64       116        60
OIR    2025130    131400   -9.6500 -136.7900      27.8        63       116        60
OIR    2025130    131400   -9.6500 -136.8000      27.5        62       115        60
OIR    2025130    131400   -9.6500 -136.8100      27.3        61       112        60
OIR    2025130    131400   -9.6500 -136.8200      27.2        61       109        60
OIR    2025130    131400   -9.6500 -136.8300      27.2        60       107        60
OIR    2025130    131400   -9.6500 -136.8400      27.2        60       104        60
OIR    2025130    131400   -9.6500 -136.8500      27.1        60       103        60
OIR    2025130    131400   -9.6500 -136.8600      27.1        60       103        60
OIR    2025130    131400   -9.6500 -136.8700      27.1        60       103        60
OIR    2025130    131400   -9.6500 -136.8800      27.1        60       103        60
OIR    2025130    131400   -9.6500 -136.8900      27.1        60       103        60
OIR    2025130    131400   -9.6500 -136.9000      27.1        60       104        60
OIR    2025130    131400   -9.6500 -136.9100      27.1        60       105        60
OIR    2025130    131400   -9.6500 -136.9200      27.1        59       107        60
OIR    2025130    131400   -9.6500 -136.9300      27.3        58       107        60
OIR    2025130    131400   -9.6500 -136.9400      27.4        58       107        60
OIR    2025130    131400   -9.6500 -136.9500      27.6        56       107        60
OIR    2025130    131400   -9.6500 -136.9600      27.7        55       108        60
OIR    2025130    131400   -9.6500 -136.9700      28.0        54       110        60
OIR    2025130    131400   -9.6500 -136.9800      28.4        52       111        60
OIR    2025130    131400   -9.6500 -136.9900      28.9        51       111        60
OIR    2025130    131400   -9.6500 -137.0000      29.4        50       111        60
OIR    2025130    131400   -9.6500 -137.0100      29.7        50       109        60
OIR    2025130    131400   -9.6500 -137.0200      30.1        50       107        60
OIR    2025130    131400   -9.6500 -137.0300      30.4        49       105        60
OIR    2025130    131400   -9.6500 -137.0400      30.7        49       105        60
OIR    2025130    131400   -9.6500 -137.0500      31.0        49       104        60
OIR    2025130    131400   -9.6500 -137.0600      31.3        49       104        60
OIR    2025130    131400   -9.6500 -137.0700      31.6        49       104        60
OIR    2025130    131400   -9.6500 -137.0800      31.9        50       104        60
OIR    2025130    131400   -9.6500 -137.0900      32.1        50       103        60
OIR    2025130    131400   -9.6500 -137.1000      32.4        50       103        60
OIR    2025130    131400   -9.6500 -137.1100      32.7        50       103        60
OIR    2025130    131400   -9.6500 -137.1200      33.0        51       103        60
OIR    2025130    131400   -9.6500 -137.1300      33.1        51       103        60
OIR    2025130    131400   -9.6500 -137.1400      33.3        51       103        60
OIR    2025130    131400   -9.6500 -137.1500      33.4        52       103        60
OIR    2025130    131400   -9.6500 -137.1600      33.5        52       103        60
OIR    2025130    131400   -9.6500 -137.1700      33.7        52       104        60
OIR    2025130    131400   -9.6500 -137.1800      33.8        52       105        60
OIR    2025130    131400   -9.6500 -137.1900      33.8        53       105        60
OIR    2025130    131400   -9.6500 -137.2000      33.8        53       105        60
OIR    2025130    131400   -9.6500 -137.2100      33.6        53       104        60
OIR    2025130    131400   -9.6500 -137.2200      33.4        53       103        60
OIR    2025130    131400   -9.6500 -137.2300      33.2        53       103        60
OIR    2025130    131400   -9.6500 -137.2400      33.0        53       103        60
OIR    2025130    131400   -9.6500 -137.2500      32.7        54       103        60
OIR    2025130    131400   -9.6500 -137.2600      32.3        54       103        60
OIR    2025130    131400   -9.6500 -137.2700      32.0        55       103        60
OIR    2025130    131400   -9.6500 -137.2800      31.7        55       103        60
OIR    2025130    131400   -9.6500 -137.2900      31.5        55       103        60
OIR    2025130    131400   -9.6500 -137.3000      31.1        56       103        60
OIR    2025130    131400   -9.6500 -137.3100      30.6        57       103        60
OIR    2025130    131400   -9.6500 -137.3200      30.0        58       103        60
OIR    2025130    131400   -9.6500 -137.3300      29.7        58       103        60
OIR    2025130    131400   -9.6500 -137.3400      29.5        59       103        60
OIR    2025130    131400   -9.6500 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6500 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.6500 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6500 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6500 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6500 -137.4900      28.8        59       103        60
OIR    2025130    131400   -9.6500 -137.5000      28.2        58       103        60
OIR    2025130    131400   -9.6500 -137.5100      26.9        57       103        60
OIR    2025130    131400   -9.6500 -137.5200      26.1        56       103        60
OIR    2025130    131400   -9.6500 -137.5300      25.4        54       103        60
OIR    2025130    131400   -9.6500 -137.5400      45.2       307       103        60
OIR    2025130    131400   -9.6500 -137.5500      69.8       304       103        60
OIR    2025130    131400   -9.6500 -137.5600      35.8       314       103        60
OIR    2025130    131400   -9.6500 -137.5700      19.1        75       103        60
OIR    2025130    131400   -9.6500 -137.5800      23.1        83       103        60
OIR    2025130    131400   -9.6500 -137.6100      55.5        74       103        60
OIR    2025130    131400   -9.6500 -137.6200      18.6        69       103        60
OIR    2025130    131400   -9.6500 -137.6300      15.1        54       103        60
OIR    2025130    131400   -9.6500 -137.6400      14.5        49       103        60
OIR    2025130    131400   -9.6500 -137.6500      14.7        39       103        60
OIR    2025130    131400   -9.6500 -137.6600      16.5        24       103        60
OIR    2025130    131400   -9.6500 -137.6700      19.5        10       103        60
OIR    2025130    131400   -9.6500 -137.6800      20.6         8       103        60
OIR    2025130    131400   -9.6500 -137.6900      21.2         5       103        60
OIR    2025130    131400   -9.6500 -137.7000      21.9         4       103        60
OIR    2025130    131400   -9.6500 -137.7100      22.6         2       103        60
OIR    2025130    131400   -9.6500 -137.7200      23.2       360       103        60
OIR    2025130    131400   -9.6500 -137.7300      24.1       358       103        60
OIR    2025130    131400   -9.6500 -137.7400      25.1       357       103        60
OIR    2025130    131400   -9.6500 -137.7500      26.4       356       103        60
OIR    2025130    131400   -9.6500 -137.7600      27.7       355       103        60
OIR    2025130    131400   -9.6500 -137.7700      29.1       355       103        60
OIR    2025130    131400   -9.6500 -137.7800      30.1       356       103        60
OIR    2025130    131400   -9.6500 -137.7900      30.8       356       103        60
OIR    2025130    131400   -9.6500 -137.8000      31.3       356       103        60
OIR    2025130    131400   -9.6500 -137.8100      31.5       356       103        60
OIR    2025130    131400   -9.6500 -137.8200      31.6       356       103        60
OIR    2025130    131400   -9.6500 -137.8300      31.6       356       103        60
OIR    2025130    131400   -9.6500 -137.8400      31.6       356       103        60
OIR    2025130    131400   -9.6500 -137.8500      31.6       356       103        60
OIR    2025130    131400   -9.6500 -137.8600      31.6       356       103        60
OIR    2025130    131400   -9.6500 -137.8700      31.5       356       103        60
OIR    2025130    131400   -9.6500 -137.8800      31.4       355       103        60
OIR    2025130    131400   -9.6500 -137.8900      31.2       354       104        60
OIR    2025130    131400   -9.6500 -137.9000      30.9       353       105        60
OIR    2025130    131400   -9.6500 -137.9100      30.5       352       107        60
OIR    2025130    131400   -9.6500 -137.9200      30.0       351       104        60
OIR    2025130    131400   -9.6500 -137.9300      28.6       344       103        60
OIR    2025130    131400   -9.6500 -137.9400      27.2       338       104        60
OIR    2025130    131400   -9.6500 -137.9500      26.1       333       109        60
OIR    2025130    131400   -9.6500 -137.9600      25.3       330       115        60
OIR    2025130    131400   -9.6500 -137.9700      24.5       328       120        60
OIR    2025130    131400   -9.6500 -137.9800      24.1       326       123        60
OIR    2025130    131400   -9.6500 -137.9900      24.0       326       125        60
OIR    2025130    131400   -9.6500 -138.0000      23.8       326       124        60
OIR    2025130    131400   -9.6500 -138.0100      23.6       326       124        60
OIR    2025130    131400   -9.6500 -138.0200      23.3       326       125        60
OIR    2025130    131400   -9.6500 -138.0300      23.3       325       128        60
OIR    2025130    131400   -9.6500 -138.0400      23.6       325       131        60
OIR    2025130    131400   -9.6500 -138.0500      23.9       325       130        60
OIR    2025130    131400   -9.6500 -138.0600      24.3       325       130        60
OIR    2025130    131400   -9.6500 -138.0700      24.5       325       134        60
OIR    2025130    131400   -9.6500 -138.0800      24.5       325       137        60
OIR    2025130    131400   -9.6500 -138.0900      24.6       325       139        60
OIR    2025130    131400   -9.6500 -138.1000      24.5       325       141        60
OIR    2025130    131400   -9.6500 -138.1100      24.4       324       142        60
OIR    2025130    131400   -9.6500 -138.1200      24.2       324       141        60
OIR    2025130    131400   -9.6500 -138.1300      24.1       324       140        60
OIR    2025130    131400   -9.6500 -138.1400      24.1       324       139        60
OIR    2025130    131400   -9.6500 -138.1500      24.0       324       139        60
OIR    2025130    131400   -9.6500 -138.1600      24.0       324       142        60
OIR    2025130    131400   -9.6500 -138.1700      24.0       324       144        60
OIR    2025130    131400   -9.6500 -138.1800      24.0       324       144        60
OIR    2025130    131400   -9.6500 -138.1900      24.0       324       142        60
OIR    2025130    131400   -9.6500 -138.2000      24.0       324       140        60
OIR    2025130    131400   -9.6500 -138.2100      24.0       324       137        60
OIR    2025130    131400   -9.6500 -138.2200      24.0       324       135        60
OIR    2025130    131400   -9.6500 -138.2300      23.9       324       134        60
OIR    2025130    131400   -9.6500 -138.2400      23.9       325       134        60
OIR    2025130    131400   -9.6500 -138.2500      23.9       325       134        60
OIR    2025130    131400   -9.6500 -138.2600      23.8       326       135        60
OIR    2025130    131400   -9.6500 -138.2700      23.8       326       135        60
OIR    2025130    131400   -9.6500 -138.2800      23.7       327       135        60
OIR    2025130    131400   -9.6500 -138.2900      23.6       327       132        60
OIR    2025130    131400   -9.6500 -138.3000      23.6       328       131        60
OIR    2025130    131400   -9.6500 -138.3100      23.5       328       131        60
OIR    2025130    131400   -9.6500 -138.3200      23.4       329       131        60
OIR    2025130    131400   -9.6500 -138.3300      23.3       329       133        60
OIR    2025130    131400   -9.6500 -138.3400      23.2       329       134        60
OIR    2025130    131400   -9.6500 -138.3500      23.0       330       133        60
OIR    2025130    131400   -9.6500 -138.3600      22.7       330       136        60
OIR    2025130    131400   -9.6500 -138.3700      22.5       331       139        60
OIR    2025130    131400   -9.6500 -138.3800      22.3       331       142        60
OIR    2025130    131400   -9.6500 -138.3900      22.2       331       144        60
OIR    2025130    131400   -9.6500 -138.4000      21.9       332       145        60
OIR    2025130    131400   -9.6500 -138.4100      21.5       332       145        60
OIR    2025130    131400   -9.6500 -138.4200      21.1       333       145        60
OIR    2025130    131400   -9.6500 -138.4300      20.9       333       147        60
OIR    2025130    131400   -9.6600 -136.0000      43.6        79       146        60
OIR    2025130    131400   -9.6600 -136.0100      43.4        79       145        60
OIR    2025130    131400   -9.6600 -136.0200      43.3        78       146        60
OIR    2025130    131400   -9.6600 -136.0300      43.2        78       146        60
OIR    2025130    131400   -9.6600 -136.0400      43.2        77       143        60
OIR    2025130    131400   -9.6600 -136.0500      43.1        77       145        60
OIR    2025130    131400   -9.6600 -136.0900      42.9        77       146        60
OIR    2025130    131400   -9.6600 -136.1000      42.8        77       144        60
OIR    2025130    131400   -9.6600 -136.1100      42.8        77       145        60
OIR    2025130    131400   -9.6600 -136.1200      42.9        77       142        60
OIR    2025130    131400   -9.6600 -136.1300      42.6        77       137        60
OIR    2025130    131400   -9.6600 -136.1400      43.3        78       140        60
OIR    2025130    131400   -9.6600 -136.1800      43.4        78       140        60
OIR    2025130    131400   -9.6600 -136.1900      43.1        77       129        60
OIR    2025130    131400   -9.6600 -136.2000      42.8        77       122        60
OIR    2025130    131400   -9.6600 -136.2100      42.7        77       116        60
OIR    2025130    131400   -9.6600 -136.2200      42.7        77       116        60
OIR    2025130    131400   -9.6600 -136.2300      42.6        77       116        60
OIR    2025130    131400   -9.6600 -136.2400      42.6        77       117        60
OIR    2025130    131400   -9.6600 -136.2500      42.6        77       122        60
OIR    2025130    131400   -9.6600 -136.2600      42.6        77       128        60
OIR    2025130    131400   -9.6600 -136.2700      42.1        77       129        60
OIR    2025130    131400   -9.6600 -136.2800      41.2        76       130        60
OIR    2025130    131400   -9.6600 -136.2900      40.0        75       129        60
OIR    2025130    131400   -9.6600 -136.3000      39.4        75       128        60
OIR    2025130    131400   -9.6600 -136.3100      39.3        75       127        60
OIR    2025130    131400   -9.6600 -136.3200      39.3        75       128        60
OIR    2025130    131400   -9.6600 -136.3300      39.3        75       130        60
OIR    2025130    131400   -9.6600 -136.3400      39.3        75       132        60
OIR    2025130    131400   -9.6600 -136.3500      39.1        75       133        60
OIR    2025130    131400   -9.6600 -136.3600      39.2        75       132        60
OIR    2025130    131400   -9.6600 -136.3700      39.2        75       131        60
OIR    2025130    131400   -9.6600 -136.3800      39.1        75       131        60
OIR    2025130    131400   -9.6600 -136.3900      38.8        75       131        60
OIR    2025130    131400   -9.6600 -136.4000      38.2        75       132        60
OIR    2025130    131400   -9.6600 -136.4100      37.8        75       134        60
OIR    2025130    131400   -9.6600 -136.4200      37.8        75       134        60
OIR    2025130    131400   -9.6600 -136.4300      37.7        75       133        60
OIR    2025130    131400   -9.6600 -136.4400      37.6        75       131        60
OIR    2025130    131400   -9.6600 -136.4500      37.4        75       130        60
OIR    2025130    131400   -9.6600 -136.4600      37.3        74       129        60
OIR    2025130    131400   -9.6600 -136.4700      37.1        74       128        60
OIR    2025130    131400   -9.6600 -136.4800      37.0        74       126        60
OIR    2025130    131400   -9.6600 -136.4900      36.8        74       126        60
OIR    2025130    131400   -9.6600 -136.5000      36.7        74       126        60
OIR    2025130    131400   -9.6600 -136.5100      36.5        74       126        60
OIR    2025130    131400   -9.6600 -136.5200      36.3        74       126        60
OIR    2025130    131400   -9.6600 -136.5300      36.0        73       127        60
OIR    2025130    131400   -9.6600 -136.5400      35.3        72       128        60
OIR    2025130    131400   -9.6600 -136.5500      34.7        70       129        60
OIR    2025130    131400   -9.6600 -136.5600      34.5        70       130        60
OIR    2025130    131400   -9.6600 -136.5700      34.5        70       127        60
OIR    2025130    131400   -9.6600 -136.5800      34.5        70       125        60
OIR    2025130    131400   -9.6600 -136.5900      34.5        70       123        60
OIR    2025130    131400   -9.6600 -136.6000      34.5        70       123        60
OIR    2025130    131400   -9.6600 -136.6100      34.4        70       124        60
OIR    2025130    131400   -9.6600 -136.6200      34.4        70       124        60
OIR    2025130    131400   -9.6600 -136.6300      34.4        70       124        60
OIR    2025130    131400   -9.6600 -136.6400      34.4        70       127        60
OIR    2025130    131400   -9.6600 -136.6500      34.4        70       129        60
OIR    2025130    131400   -9.6600 -136.6600      34.0        70       132        60
OIR    2025130    131400   -9.6600 -136.6700      31.5        71       133        60
OIR    2025130    131400   -9.6600 -136.6800      31.3        71       131        60
OIR    2025130    131400   -9.6600 -136.6900      31.1        71       129        60
OIR    2025130    131400   -9.6600 -136.7000      30.9        71       127        60
OIR    2025130    131400   -9.6600 -136.7100      30.8        70       127        60
OIR    2025130    131400   -9.6600 -136.7200      30.7        70       126        60
OIR    2025130    131400   -9.6600 -136.7300      30.5        70       125        60
OIR    2025130    131400   -9.6600 -136.7400      30.3        69       122        60
OIR    2025130    131400   -9.6600 -136.7500      30.0        69       119        60
OIR    2025130    131400   -9.6600 -136.7600      29.5        68       116        60
OIR    2025130    131400   -9.6600 -136.7700      28.6        65       116        60
OIR    2025130    131400   -9.6600 -136.7800      28.1        64       116        60
OIR    2025130    131400   -9.6600 -136.7900      27.8        63       116        60
OIR    2025130    131400   -9.6600 -136.8000      27.5        61       115        60
OIR    2025130    131400   -9.6600 -136.8100      27.4        61       112        60
OIR    2025130    131400   -9.6600 -136.8200      27.3        60       110        60
OIR    2025130    131400   -9.6600 -136.8300      27.3        60       108        60
OIR    2025130    131400   -9.6600 -136.8400      27.3        60       105        60
OIR    2025130    131400   -9.6600 -136.8500      27.2        60       104        60
OIR    2025130    131400   -9.6600 -136.8600      27.2        60       104        60
OIR    2025130    131400   -9.6600 -136.8700      27.1        60       103        60
OIR    2025130    131400   -9.6600 -136.8800      27.1        60       103        60
OIR    2025130    131400   -9.6600 -136.8900      27.1        60       103        60
OIR    2025130    131400   -9.6600 -136.9000      27.1        59       104        60
OIR    2025130    131400   -9.6600 -136.9100      27.2        58       104        60
OIR    2025130    131400   -9.6600 -136.9200      27.4        57       104        60
OIR    2025130    131400   -9.6600 -136.9300      27.5        57       104        60
OIR    2025130    131400   -9.6600 -136.9400      27.8        55       104        60
OIR    2025130    131400   -9.6600 -136.9500      28.1        54       105        60
OIR    2025130    131400   -9.6600 -136.9600      28.3        53       108        60
OIR    2025130    131400   -9.6600 -136.9700      28.5        52       109        60
OIR    2025130    131400   -9.6600 -136.9800      28.8        51       110        60
OIR    2025130    131400   -9.6600 -136.9900      29.1        50       110        60
OIR    2025130    131400   -9.6600 -137.0000      29.5        50       110        60
OIR    2025130    131400   -9.6600 -137.0100      29.8        49       108        60
OIR    2025130    131400   -9.6600 -137.0200      30.1        49       105        60
OIR    2025130    131400   -9.6600 -137.0300      30.4        49       105        60
OIR    2025130    131400   -9.6600 -137.0400      30.7        49       105        60
OIR    2025130    131400   -9.6600 -137.0500      31.0        49       104        60
OIR    2025130    131400   -9.6600 -137.0600      31.2        49       104        60
OIR    2025130    131400   -9.6600 -137.0700      31.5        49       104        60
OIR    2025130    131400   -9.6600 -137.0800      31.8        49       104        60
OIR    2025130    131400   -9.6600 -137.0900      32.0        49       103        60
OIR    2025130    131400   -9.6600 -137.1000      32.3        49       103        60
OIR    2025130    131400   -9.6600 -137.1100      32.6        50       103        60
OIR    2025130    131400   -9.6600 -137.1200      32.9        50       103        60
OIR    2025130    131400   -9.6600 -137.1300      33.1        51       103        60
OIR    2025130    131400   -9.6600 -137.1400      33.2        51       103        60
OIR    2025130    131400   -9.6600 -137.1500      33.4        51       103        60
OIR    2025130    131400   -9.6600 -137.1600      33.5        52       103        60
OIR    2025130    131400   -9.6600 -137.1700      33.7        52       104        60
OIR    2025130    131400   -9.6600 -137.1800      33.8        52       105        60
OIR    2025130    131400   -9.6600 -137.1900      33.9        52       105        60
OIR    2025130    131400   -9.6600 -137.2000      33.8        52       105        60
OIR    2025130    131400   -9.6600 -137.2100      33.7        52       104        60
OIR    2025130    131400   -9.6600 -137.2200      33.6        52       103        60
OIR    2025130    131400   -9.6600 -137.2300      33.5        53       103        60
OIR    2025130    131400   -9.6600 -137.2400      33.3        53       103        60
OIR    2025130    131400   -9.6600 -137.2500      33.1        53       103        60
OIR    2025130    131400   -9.6600 -137.2600      32.9        53       103        60
OIR    2025130    131400   -9.6600 -137.2700      32.6        54       103        60
OIR    2025130    131400   -9.6600 -137.2800      32.2        54       103        60
OIR    2025130    131400   -9.6600 -137.2900      31.9        55       103        60
OIR    2025130    131400   -9.6600 -137.3000      31.5        56       103        60
OIR    2025130    131400   -9.6600 -137.3100      31.0        56       103        60
OIR    2025130    131400   -9.6600 -137.3200      30.3        57       103        60
OIR    2025130    131400   -9.6600 -137.3300      29.9        58       103        60
OIR    2025130    131400   -9.6600 -137.3400      29.6        58       103        60
OIR    2025130    131400   -9.6600 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.6600 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6600 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6600 -137.4800      29.3        59       103        60
OIR    2025130    131400   -9.6600 -137.4900      28.8        59       103        60
OIR    2025130    131400   -9.6600 -137.5000      27.7        59       103        60
OIR    2025130    131400   -9.6600 -137.5100      25.8        59       103        60
OIR    2025130    131400   -9.6600 -137.5200      24.3        60       103        60
OIR    2025130    131400   -9.6600 -137.5300      22.4        65       103        60
OIR    2025130    131400   -9.6600 -137.5400      38.5       263       103        60
OIR    2025130    131400   -9.6600 -137.5500      63.7       250       103        60
OIR    2025130    131400   -9.6600 -137.5600      27.3       241       103        60
OIR    2025130    131400   -9.6600 -137.5700      24.1        65       103        60
OIR    2025130    131400   -9.6600 -137.5800      22.3        61       103        60
OIR    2025130    131400   -9.6600 -137.5900      66.6        97       103        60
OIR    2025130    131400   -9.6600 -137.6100      55.3        96       103        60
OIR    2025130    131400   -9.6600 -137.6200      19.7        81       103        60
OIR    2025130    131400   -9.6600 -137.6300      16.3        45       103        60
OIR    2025130    131400   -9.6600 -137.6400      17.0        35       103        60
OIR    2025130    131400   -9.6600 -137.6500      18.7        30       103        60
OIR    2025130    131400   -9.6600 -137.6600      19.4        26       103        60
OIR    2025130    131400   -9.6600 -137.6700      21.6        14       103        60
OIR    2025130    131400   -9.6600 -137.6800      22.3        11       103        60
OIR    2025130    131400   -9.6600 -137.6900      22.8         8       103        60
OIR    2025130    131400   -9.6600 -137.7000      23.4         6       103        60
OIR    2025130    131400   -9.6600 -137.7100      24.0         4       103        60
OIR    2025130    131400   -9.6600 -137.7200      24.4         2       103        60
OIR    2025130    131400   -9.6600 -137.7300      25.1         0       103        60
OIR    2025130    131400   -9.6600 -137.7400      26.0       359       103        60
OIR    2025130    131400   -9.6600 -137.7500      27.3       357       103        60
OIR    2025130    131400   -9.6600 -137.7600      28.8       356       103        60
OIR    2025130    131400   -9.6600 -137.7700      30.0       356       103        60
OIR    2025130    131400   -9.6600 -137.7800      30.8       356       103        60
OIR    2025130    131400   -9.6600 -137.7900      31.2       356       103        60
OIR    2025130    131400   -9.6600 -137.8000      31.4       356       103        60
OIR    2025130    131400   -9.6600 -137.8100      31.5       356       103        60
OIR    2025130    131400   -9.6600 -137.8200      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8300      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8400      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8500      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8600      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8700      31.6       356       103        60
OIR    2025130    131400   -9.6600 -137.8800      31.6       355       103        60
OIR    2025130    131400   -9.6600 -137.8900      31.5       354       104        60
OIR    2025130    131400   -9.6600 -137.9000      31.3       353       104        60
OIR    2025130    131400   -9.6600 -137.9100      31.1       353       105        60
OIR    2025130    131400   -9.6600 -137.9200      30.8       352       104        60
OIR    2025130    131400   -9.6600 -137.9300      30.0       349       103        60
OIR    2025130    131400   -9.6600 -137.9400      28.8       344       104        60
OIR    2025130    131400   -9.6600 -137.9500      27.3       339       108        60
OIR    2025130    131400   -9.6600 -137.9600      26.0       334       114        60
OIR    2025130    131400   -9.6600 -137.9700      25.1       331       119        60
OIR    2025130    131400   -9.6600 -137.9800      24.6       328       122        60
OIR    2025130    131400   -9.6600 -137.9900      24.3       327       124        60
OIR    2025130    131400   -9.6600 -138.0000      24.0       327       123        60
OIR    2025130    131400   -9.6600 -138.0100      23.8       327       124        60
OIR    2025130    131400   -9.6600 -138.0200      23.7       327       125        60
OIR    2025130    131400   -9.6600 -138.0300      23.7       327       128        60
OIR    2025130    131400   -9.6600 -138.0400      24.1       327       131        60
OIR    2025130    131400   -9.6600 -138.0500      24.3       327       130        60
OIR    2025130    131400   -9.6600 -138.0600      24.5       327       130        60
OIR    2025130    131400   -9.6600 -138.0700      24.6       326       132        60
OIR    2025130    131400   -9.6600 -138.0800      24.6       326       134        60
OIR    2025130    131400   -9.6600 -138.0900      24.6       326       137        60
OIR    2025130    131400   -9.6600 -138.1000      24.6       325       139        60
OIR    2025130    131400   -9.6600 -138.1100      24.4       325       141        60
OIR    2025130    131400   -9.6600 -138.1200      24.3       324       144        60
OIR    2025130    131400   -9.6600 -138.1300      24.2       324       146        60
OIR    2025130    131400   -9.6600 -138.1400      24.1       324       145        60
OIR    2025130    131400   -9.6600 -138.1500      24.1       324       144        60
OIR    2025130    131400   -9.6600 -138.1600      24.1       324       146        60
OIR    2025130    131400   -9.6600 -138.1700      24.0       324       148        60
OIR    2025130    131400   -9.6600 -138.1800      24.0       324       145        60
OIR    2025130    131400   -9.6600 -138.1900      24.0       324       143        60
OIR    2025130    131400   -9.6600 -138.2000      24.0       324       141        60
OIR    2025130    131400   -9.6600 -138.2100      24.0       324       139        60
OIR    2025130    131400   -9.6600 -138.2200      24.0       324       136        60
OIR    2025130    131400   -9.6600 -138.2300      24.0       325       135        60
OIR    2025130    131400   -9.6600 -138.2400      24.0       325       134        60
OIR    2025130    131400   -9.6600 -138.2500      24.0       325       134        60
OIR    2025130    131400   -9.6600 -138.2600      23.9       326       135        60
OIR    2025130    131400   -9.6600 -138.2700      23.8       326       134        60
OIR    2025130    131400   -9.6600 -138.2800      23.7       327       134        60
OIR    2025130    131400   -9.6600 -138.2900      23.7       327       132        60
OIR    2025130    131400   -9.6600 -138.3000      23.6       328       131        60
OIR    2025130    131400   -9.6600 -138.3100      23.6       328       131        60
OIR    2025130    131400   -9.6600 -138.3200      23.5       329       131        60
OIR    2025130    131400   -9.6600 -138.3300      23.4       329       132        60
OIR    2025130    131400   -9.6600 -138.3400      23.3       329       133        60
OIR    2025130    131400   -9.6600 -138.3500      23.1       330       133        60
OIR    2025130    131400   -9.6600 -138.3600      22.8       331       136        60
OIR    2025130    131400   -9.6600 -138.3700      22.6       331       138        60
OIR    2025130    131400   -9.6600 -138.3800      22.4       331       141        60
OIR    2025130    131400   -9.6600 -138.3900      22.3       331       142        60
OIR    2025130    131400   -9.6600 -138.4000      21.9       332       143        60
OIR    2025130    131400   -9.6600 -138.4100      21.4       333       144        60
OIR    2025130    131400   -9.6600 -138.4200      21.0       333       144        60
OIR    2025130    131400   -9.6600 -138.4300      20.8       334       146        60
OIR    2025130    131400   -9.6700 -136.0000      43.6        79       147        60
OIR    2025130    131400   -9.6700 -136.0100      43.4        78       146        60
OIR    2025130    131400   -9.6700 -136.0200      43.3        78       146        60
OIR    2025130    131400   -9.6700 -136.0300      43.2        78       145        60
OIR    2025130    131400   -9.6700 -136.0400      43.1        77       143        60
OIR    2025130    131400   -9.6700 -136.0500      43.1        77       145        60
OIR    2025130    131400   -9.6700 -136.0700      43.0        77       147        60
OIR    2025130    131400   -9.6700 -136.0800      43.0        77       146        60
OIR    2025130    131400   -9.6700 -136.0900      43.0        77       146        60
OIR    2025130    131400   -9.6700 -136.1000      43.0        77       145        60
OIR    2025130    131400   -9.6700 -136.1100      43.0        77       143        60
OIR    2025130    131400   -9.6700 -136.1200      43.0        77       141        60
OIR    2025130    131400   -9.6700 -136.1300      43.0        77       139        60
OIR    2025130    131400   -9.6700 -136.1400      43.5        78       143        60
OIR    2025130    131400   -9.6700 -136.1800      43.6        78       138        60
OIR    2025130    131400   -9.6700 -136.1900      43.5        78       129        60
OIR    2025130    131400   -9.6700 -136.2000      43.0        77       122        60
OIR    2025130    131400   -9.6700 -136.2100      42.9        77       116        60
OIR    2025130    131400   -9.6700 -136.2200      42.9        77       117        60
OIR    2025130    131400   -9.6700 -136.2300      42.8        77       120        60
OIR    2025130    131400   -9.6700 -136.2400      42.7        77       122        60
OIR    2025130    131400   -9.6700 -136.2500      42.7        77       124        60
OIR    2025130    131400   -9.6700 -136.2600      42.6        77       128        60
OIR    2025130    131400   -9.6700 -136.2700      42.2        77       129        60
OIR    2025130    131400   -9.6700 -136.2800      41.4        76       129        60
OIR    2025130    131400   -9.6700 -136.2900      40.3        75       129        60
OIR    2025130    131400   -9.6700 -136.3000      39.4        75       128        60
OIR    2025130    131400   -9.6700 -136.3100      39.3        75       128        60
OIR    2025130    131400   -9.6700 -136.3200      39.3        75       129        60
OIR    2025130    131400   -9.6700 -136.3300      39.4        75       131        60
OIR    2025130    131400   -9.6700 -136.3400      39.4        75       133        60
OIR    2025130    131400   -9.6700 -136.3500      39.3        75       133        60
OIR    2025130    131400   -9.6700 -136.3600      39.4        75       133        60
OIR    2025130    131400   -9.6700 -136.3700      39.4        75       130        60
OIR    2025130    131400   -9.6700 -136.3800      39.3        75       130        60
OIR    2025130    131400   -9.6700 -136.3900      39.1        75       131        60
OIR    2025130    131400   -9.6700 -136.4000      38.6        75       132        60
OIR    2025130    131400   -9.6700 -136.4100      38.2        75       134        60
OIR    2025130    131400   -9.6700 -136.4200      38.2        75       134        60
OIR    2025130    131400   -9.6700 -136.4300      38.0        74       133        60
OIR    2025130    131400   -9.6700 -136.4400      37.8        74       131        60
OIR    2025130    131400   -9.6700 -136.4500      37.6        74       129        60
OIR    2025130    131400   -9.6700 -136.4600      37.4        74       129        60
OIR    2025130    131400   -9.6700 -136.4700      37.2        74       128        60
OIR    2025130    131400   -9.6700 -136.4800      37.0        74       127        60
OIR    2025130    131400   -9.6700 -136.4900      36.7        74       126        60
OIR    2025130    131400   -9.6700 -136.5000      36.5        74       125        60
OIR    2025130    131400   -9.6700 -136.5100      36.2        74       124        60
OIR    2025130    131400   -9.6700 -136.5200      35.9        73       123        60
OIR    2025130    131400   -9.6700 -136.5300      35.6        73       125        60
OIR    2025130    131400   -9.6700 -136.5400      34.8        71       127        60
OIR    2025130    131400   -9.6700 -136.5500      34.5        70       127        60
OIR    2025130    131400   -9.6700 -136.5600      34.5        70       127        60
OIR    2025130    131400   -9.6700 -136.5700      34.5        70       125        60
OIR    2025130    131400   -9.6700 -136.5800      34.5        70       123        60
OIR    2025130    131400   -9.6700 -136.5900      34.5        70       122        60
OIR    2025130    131400   -9.6700 -136.6000      34.4        70       122        60
OIR    2025130    131400   -9.6700 -136.6100      34.4        70       122        60
OIR    2025130    131400   -9.6700 -136.6200      34.4        70       122        60
OIR    2025130    131400   -9.6700 -136.6300      34.4        70       122        60
OIR    2025130    131400   -9.6700 -136.6400      34.4        70       125        60
OIR    2025130    131400   -9.6700 -136.6500      34.3        70       128        60
OIR    2025130    131400   -9.6700 -136.6600      33.7        70       132        60
OIR    2025130    131400   -9.6700 -136.6700      32.0        71       136        60
OIR    2025130    131400   -9.6700 -136.6800      31.5        71       133        60
OIR    2025130    131400   -9.6700 -136.6900      31.2        71       130        60
OIR    2025130    131400   -9.6700 -136.7000      31.0        71       128        60
OIR    2025130    131400   -9.6700 -136.7100      30.9        70       127        60
OIR    2025130    131400   -9.6700 -136.7200      30.8        70       126        60
OIR    2025130    131400   -9.6700 -136.7300      30.6        70       124        60
OIR    2025130    131400   -9.6700 -136.7400      30.4        69       123        60
OIR    2025130    131400   -9.6700 -136.7500      30.0        69       119        60
OIR    2025130    131400   -9.6700 -136.7600      29.3        67       116        60
OIR    2025130    131400   -9.6700 -136.7700      28.4        65       117        60
OIR    2025130    131400   -9.6700 -136.7800      28.0        63       117        60
OIR    2025130    131400   -9.6700 -136.7900      27.8        62       116        60
OIR    2025130    131400   -9.6700 -136.8000      27.6        61       115        60
OIR    2025130    131400   -9.6700 -136.8100      27.5        60       113        60
OIR    2025130    131400   -9.6700 -136.8200      27.4        60       111        60
OIR    2025130    131400   -9.6700 -136.8300      27.4        60       109        60
OIR    2025130    131400   -9.6700 -136.8400      27.3        60       107        60
OIR    2025130    131400   -9.6700 -136.8500      27.3        60       105        60
OIR    2025130    131400   -9.6700 -136.8600      27.2        60       104        60
OIR    2025130    131400   -9.6700 -136.8700      27.3        59       103        60
OIR    2025130    131400   -9.6700 -136.8800      27.4        59       103        60
OIR    2025130    131400   -9.6700 -136.8900      27.5        58       103        60
OIR    2025130    131400   -9.6700 -136.9000      27.6        57       103        60
OIR    2025130    131400   -9.6700 -136.9100      27.7        56       104        60
OIR    2025130    131400   -9.6700 -136.9200      27.9        55       104        60
OIR    2025130    131400   -9.6700 -136.9300      28.1        54       104        60
OIR    2025130    131400   -9.6700 -136.9400      28.3        53       104        60
OIR    2025130    131400   -9.6700 -136.9500      28.4        52       105        60
OIR    2025130    131400   -9.6700 -136.9600      28.6        51       107        60
OIR    2025130    131400   -9.6700 -136.9700      28.8        51       109        60
OIR    2025130    131400   -9.6700 -136.9800      29.0        50       110        60
OIR    2025130    131400   -9.6700 -136.9900      29.2        50       109        60
OIR    2025130    131400   -9.6700 -137.0000      29.5        49       109        60
OIR    2025130    131400   -9.6700 -137.0100      29.8        49       107        60
OIR    2025130    131400   -9.6700 -137.0200      30.1        48       105        60
OIR    2025130    131400   -9.6700 -137.0300      30.4        48       105        60
OIR    2025130    131400   -9.6700 -137.0400      30.7        48       105        60
OIR    2025130    131400   -9.6700 -137.0500      30.9        48       104        60
OIR    2025130    131400   -9.6700 -137.0600      31.2        48       104        60
OIR    2025130    131400   -9.6700 -137.0700      31.4        48       104        60
OIR    2025130    131400   -9.6700 -137.0800      31.6        48       104        60
OIR    2025130    131400   -9.6700 -137.0900      31.9        49       103        60
OIR    2025130    131400   -9.6700 -137.1000      32.2        49       103        60
OIR    2025130    131400   -9.6700 -137.1100      32.5        49       103        60
OIR    2025130    131400   -9.6700 -137.1200      32.7        50       103        60
OIR    2025130    131400   -9.6700 -137.1300      33.0        50       103        60
OIR    2025130    131400   -9.6700 -137.1400      33.2        51       103        60
OIR    2025130    131400   -9.6700 -137.1500      33.4        51       103        60
OIR    2025130    131400   -9.6700 -137.1600      33.5        51       103        60
OIR    2025130    131400   -9.6700 -137.1700      33.6        51       104        60
OIR    2025130    131400   -9.6700 -137.1800      33.8        52       104        60
OIR    2025130    131400   -9.6700 -137.1900      33.9        52       104        60
OIR    2025130    131400   -9.6700 -137.2000      33.9        52       104        60
OIR    2025130    131400   -9.6700 -137.2100      33.8        52       104        60
OIR    2025130    131400   -9.6700 -137.2200      33.7        52       103        60
OIR    2025130    131400   -9.6700 -137.2300      33.6        52       103        60
OIR    2025130    131400   -9.6700 -137.2400      33.5        52       103        60
OIR    2025130    131400   -9.6700 -137.2500      33.4        52       103        60
OIR    2025130    131400   -9.6700 -137.2600      33.3        53       103        60
OIR    2025130    131400   -9.6700 -137.2700      33.1        53       103        60
OIR    2025130    131400   -9.6700 -137.2800      32.8        54       103        60
OIR    2025130    131400   -9.6700 -137.2900      32.4        54       103        60
OIR    2025130    131400   -9.6700 -137.3000      32.0        55       103        60
OIR    2025130    131400   -9.6700 -137.3100      31.4        56       103        60
OIR    2025130    131400   -9.6700 -137.3200      30.7        57       103        60
OIR    2025130    131400   -9.6700 -137.3300      30.1        58       103        60
OIR    2025130    131400   -9.6700 -137.3400      29.6        58       103        60
OIR    2025130    131400   -9.6700 -137.3500      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4400      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.6700 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6700 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6700 -137.4800      29.3        59       103        60
OIR    2025130    131400   -9.6700 -137.4900      29.0        59       103        60
OIR    2025130    131400   -9.6700 -137.5000      26.8        60       103        60
OIR    2025130    131400   -9.6700 -137.5100      23.9        64       103        60
OIR    2025130    131400   -9.6700 -137.5200      21.6        70       103        60
OIR    2025130    131400   -9.6700 -137.5300      19.2        79       103        60
OIR    2025130    131400   -9.6700 -137.5400      18.1       219       103        60
OIR    2025130    131400   -9.6700 -137.5500      61.5       215       103        60
OIR    2025130    131400   -9.6700 -137.5600      66.7       209       103        60
OIR    2025130    131400   -9.6700 -137.5700      54.8       185       103        60
OIR    2025130    131400   -9.6700 -137.5800      63.6       146       103        60
OIR    2025130    131400   -9.6700 -137.6100      40.8       109       103        60
OIR    2025130    131400   -9.6700 -137.6200      18.6        76       103        60
OIR    2025130    131400   -9.6700 -137.6300      16.4        37       103        60
OIR    2025130    131400   -9.6700 -137.6400      17.6        30       103        60
OIR    2025130    131400   -9.6700 -137.6500      19.4        26       103        60
OIR    2025130    131400   -9.6700 -137.6600      21.3        22       103        60
OIR    2025130    131400   -9.6700 -137.6700      23.1        15       103        60
OIR    2025130    131400   -9.6700 -137.6800      23.6        13       103        60
OIR    2025130    131400   -9.6700 -137.6900      24.0        10       103        60
OIR    2025130    131400   -9.6700 -137.7000      24.6         8       103        60
OIR    2025130    131400   -9.6700 -137.7100      25.2         5       103        60
OIR    2025130    131400   -9.6700 -137.7200      25.6         4       103        60
OIR    2025130    131400   -9.6700 -137.7300      26.1         2       103        60
OIR    2025130    131400   -9.6700 -137.7400      27.0         1       103        60
OIR    2025130    131400   -9.6700 -137.7500      28.1       359       103        60
OIR    2025130    131400   -9.6700 -137.7600      29.4       357       103        60
OIR    2025130    131400   -9.6700 -137.7700      30.5       357       103        60
OIR    2025130    131400   -9.6700 -137.7800      31.1       356       103        60
OIR    2025130    131400   -9.6700 -137.7900      31.4       356       103        60
OIR    2025130    131400   -9.6700 -137.8000      31.5       356       103        60
OIR    2025130    131400   -9.6700 -137.8100      31.6       356       103        60
OIR    2025130    131400   -9.6700 -137.8200      31.6       356       103        60
OIR    2025130    131400   -9.6700 -137.8300      31.7       356       103        60
OIR    2025130    131400   -9.6700 -137.8400      31.7       356       103        60
OIR    2025130    131400   -9.6700 -137.8500      31.7       356       103        60
OIR    2025130    131400   -9.6700 -137.8600      31.7       356       103        60
OIR    2025130    131400   -9.6700 -137.8700      31.7       356       103        60
OIR    2025130    131400   -9.6700 -137.8800      31.8       355       103        60
OIR    2025130    131400   -9.6700 -137.8900      31.8       354       103        60
OIR    2025130    131400   -9.6700 -137.9000      31.7       354       104        60
OIR    2025130    131400   -9.6700 -137.9100      31.6       353       105        60
OIR    2025130    131400   -9.6700 -137.9200      31.4       352       104        60
OIR    2025130    131400   -9.6700 -137.9300      30.9       350       103        60
OIR    2025130    131400   -9.6700 -137.9400      29.9       347       104        60
OIR    2025130    131400   -9.6700 -137.9500      28.5       343       108        60
OIR    2025130    131400   -9.6700 -137.9600      26.8       338       114        60
OIR    2025130    131400   -9.6700 -137.9700      25.7       334       117        60
OIR    2025130    131400   -9.6700 -137.9800      25.0       330       121        60
OIR    2025130    131400   -9.6700 -137.9900      24.5       329       123        60
OIR    2025130    131400   -9.6700 -138.0000      24.2       328       122        60
OIR    2025130    131400   -9.6700 -138.0100      24.0       328       123        60
OIR    2025130    131400   -9.6700 -138.0200      23.8       329       125        60
OIR    2025130    131400   -9.6700 -138.0300      23.9       328       128        60
OIR    2025130    131400   -9.6700 -138.0400      24.2       328       130        60
OIR    2025130    131400   -9.6700 -138.0500      24.4       328       129        60
OIR    2025130    131400   -9.6700 -138.0600      24.5       328       128        60
OIR    2025130    131400   -9.6700 -138.0700      24.6       327       129        60
OIR    2025130    131400   -9.6700 -138.0800      24.6       327       130        60
OIR    2025130    131400   -9.6700 -138.0900      24.6       327       133        60
OIR    2025130    131400   -9.6700 -138.1000      24.5       326       137        60
OIR    2025130    131400   -9.6700 -138.1100      24.4       325       140        60
OIR    2025130    131400   -9.6700 -138.1200      24.3       324       145        60
OIR    2025130    131400   -9.6700 -138.1500      24.2       324       149        60
OIR    2025130    131400   -9.6700 -138.1800      24.1       324       146        60
OIR    2025130    131400   -9.6700 -138.1900      24.1       324       143        60
OIR    2025130    131400   -9.6700 -138.2000      24.1       324       142        60
OIR    2025130    131400   -9.6700 -138.2100      24.1       324       141        60
OIR    2025130    131400   -9.6700 -138.2200      24.1       324       138        60
OIR    2025130    131400   -9.6700 -138.2300      24.1       325       136        60
OIR    2025130    131400   -9.6700 -138.2400      24.1       325       135        60
OIR    2025130    131400   -9.6700 -138.2500      24.1       326       135        60
OIR    2025130    131400   -9.6700 -138.2600      24.0       326       134        60
OIR    2025130    131400   -9.6700 -138.2700      23.9       327       134        60
OIR    2025130    131400   -9.6700 -138.2800      23.8       327       133        60
OIR    2025130    131400   -9.6700 -138.2900      23.8       328       131        60
OIR    2025130    131400   -9.6700 -138.3000      23.7       328       130        60
OIR    2025130    131400   -9.6700 -138.3100      23.6       328       130        60
OIR    2025130    131400   -9.6700 -138.3200      23.6       329       131        60
OIR    2025130    131400   -9.6700 -138.3300      23.5       329       131        60
OIR    2025130    131400   -9.6700 -138.3400      23.4       329       132        60
OIR    2025130    131400   -9.6700 -138.3500      23.2       329       133        60
OIR    2025130    131400   -9.6700 -138.3600      22.8       330       135        60
OIR    2025130    131400   -9.6700 -138.3700      22.6       331       137        60
OIR    2025130    131400   -9.6700 -138.3800      22.5       331       139        60
OIR    2025130    131400   -9.6700 -138.3900      22.3       331       141        60
OIR    2025130    131400   -9.6700 -138.4000      21.8       332       142        60
OIR    2025130    131400   -9.6700 -138.4100      21.2       333       143        60
OIR    2025130    131400   -9.6700 -138.4200      20.9       334       144        60
OIR    2025130    131400   -9.6700 -138.4300      20.8       334       146        60
OIR    2025130    131400   -9.6700 -138.4400      20.7       334       149        60
OIR    2025130    131400   -9.6800 -136.0400      43.1        77       146        60
OIR    2025130    131400   -9.6800 -136.0500      43.1        77       146        60
OIR    2025130    131400   -9.6800 -136.0600      43.0        77       146        60
OIR    2025130    131400   -9.6800 -136.0700      43.0        77       146        60
OIR    2025130    131400   -9.6800 -136.0800      43.0        77       145        60
OIR    2025130    131400   -9.6800 -136.1100      43.0        77       146        60
OIR    2025130    131400   -9.6800 -136.1200      43.0        77       144        60
OIR    2025130    131400   -9.6800 -136.1300      43.0        77       142        60
OIR    2025130    131400   -9.6800 -136.1400      43.6        78       145        60
OIR    2025130    131400   -9.6800 -136.1700      43.9        78       145        60
OIR    2025130    131400   -9.6800 -136.1800      43.9        78       136        60
OIR    2025130    131400   -9.6800 -136.1900      43.8        78       127        60
OIR    2025130    131400   -9.6800 -136.2000      43.4        77       121        60
OIR    2025130    131400   -9.6800 -136.2100      43.2        77       119        60
OIR    2025130    131400   -9.6800 -136.2200      43.0        77       121        60
OIR    2025130    131400   -9.6800 -136.2300      42.9        77       122        60
OIR    2025130    131400   -9.6800 -136.2400      42.8        77       122        60
OIR    2025130    131400   -9.6800 -136.2500      42.8        77       124        60
OIR    2025130    131400   -9.6800 -136.2600      42.7        77       127        60
OIR    2025130    131400   -9.6800 -136.2700      42.5        77       128        60
OIR    2025130    131400   -9.6800 -136.2800      41.7        76       128        60
OIR    2025130    131400   -9.6800 -136.2900      40.4        75       128        60
OIR    2025130    131400   -9.6800 -136.3000      39.4        75       128        60
OIR    2025130    131400   -9.6800 -136.3100      39.4        75       128        60
OIR    2025130    131400   -9.6800 -136.3200      39.4        75       130        60
OIR    2025130    131400   -9.6800 -136.3300      39.4        75       133        60
OIR    2025130    131400   -9.6800 -136.3400      39.4        75       133        60
OIR    2025130    131400   -9.6800 -136.3500      39.4        75       133        60
OIR    2025130    131400   -9.6800 -136.3600      39.4        75       132        60
OIR    2025130    131400   -9.6800 -136.3700      39.4        75       130        60
OIR    2025130    131400   -9.6800 -136.3800      39.4        75       130        60
OIR    2025130    131400   -9.6800 -136.3900      39.3        75       131        60
OIR    2025130    131400   -9.6800 -136.4000      39.1        74       132        60
OIR    2025130    131400   -9.6800 -136.4100      38.8        74       134        60
OIR    2025130    131400   -9.6800 -136.4200      38.8        74       133        60
OIR    2025130    131400   -9.6800 -136.4300      38.7        74       132        60
OIR    2025130    131400   -9.6800 -136.4400      38.5        74       129        60
OIR    2025130    131400   -9.6800 -136.4500      38.1        74       127        60
OIR    2025130    131400   -9.6800 -136.4600      37.7        74       127        60
OIR    2025130    131400   -9.6800 -136.4700      37.4        73       126        60
OIR    2025130    131400   -9.6800 -136.4800      37.0        73       126        60
OIR    2025130    131400   -9.6800 -136.4900      36.6        73       125        60
OIR    2025130    131400   -9.6800 -136.5000      36.3        73       124        60
OIR    2025130    131400   -9.6800 -136.5100      36.1        73       124        60
OIR    2025130    131400   -9.6800 -136.5200      35.7        73       123        60
OIR    2025130    131400   -9.6800 -136.5300      35.4        72       124        60
OIR    2025130    131400   -9.6800 -136.5400      34.6        70       125        60
OIR    2025130    131400   -9.6800 -136.5500      34.4        70       125        60
OIR    2025130    131400   -9.6800 -136.5600      34.4        70       125        60
OIR    2025130    131400   -9.6800 -136.5700      34.4        70       123        60
OIR    2025130    131400   -9.6800 -136.5800      34.4        70       121        60
OIR    2025130    131400   -9.6800 -136.5900      34.4        70       121        60
OIR    2025130    131400   -9.6800 -136.6000      34.4        70       121        60
OIR    2025130    131400   -9.6800 -136.6100      34.4        70       122        60
OIR    2025130    131400   -9.6800 -136.6200      34.4        70       122        60
OIR    2025130    131400   -9.6800 -136.6300      34.4        70       122        60
OIR    2025130    131400   -9.6800 -136.6400      34.4        70       125        60
OIR    2025130    131400   -9.6800 -136.6500      34.3        70       128        60
OIR    2025130    131400   -9.6800 -136.6600      34.1        70       131        60
OIR    2025130    131400   -9.6800 -136.6700      33.4        70       134        60
OIR    2025130    131400   -9.6800 -136.6800      32.8        70       133        60
OIR    2025130    131400   -9.6800 -136.6900      31.9        70       132        60
OIR    2025130    131400   -9.6800 -136.7000      31.4        70       129        60
OIR    2025130    131400   -9.6800 -136.7100      31.1        70       128        60
OIR    2025130    131400   -9.6800 -136.7200      30.8        70       127        60
OIR    2025130    131400   -9.6800 -136.7300      30.7        70       125        60
OIR    2025130    131400   -9.6800 -136.7400      30.4        69       124        60
OIR    2025130    131400   -9.6800 -136.7500      29.9        69       120        60
OIR    2025130    131400   -9.6800 -136.7600      29.0        67       117        60
OIR    2025130    131400   -9.6800 -136.7700      28.2        64       117        60
OIR    2025130    131400   -9.6800 -136.7800      27.8        63       117        60
OIR    2025130    131400   -9.6800 -136.7900      27.6        61       116        60
OIR    2025130    131400   -9.6800 -136.8000      27.5        61       115        60
OIR    2025130    131400   -9.6800 -136.8100      27.5        60       115        60
OIR    2025130    131400   -9.6800 -136.8200      27.5        60       114        60
OIR    2025130    131400   -9.6800 -136.8300      27.4        59       112        60
OIR    2025130    131400   -9.6800 -136.8400      27.4        59       110        60
OIR    2025130    131400   -9.6800 -136.8500      27.3        59       109        60
OIR    2025130    131400   -9.6800 -136.8600      27.3        59       105        60
OIR    2025130    131400   -9.6800 -136.8700      27.4        58       104        60
OIR    2025130    131400   -9.6800 -136.8800      27.6        58       103        60
OIR    2025130    131400   -9.6800 -136.8900      27.8        57       103        60
OIR    2025130    131400   -9.6800 -136.9000      27.9        55       103        60
OIR    2025130    131400   -9.6800 -136.9100      28.0        55       103        60
OIR    2025130    131400   -9.6800 -136.9200      28.2        54       104        60
OIR    2025130    131400   -9.6800 -136.9300      28.3        53       104        60
OIR    2025130    131400   -9.6800 -136.9400      28.5        52       104        60
OIR    2025130    131400   -9.6800 -136.9500      28.7        51       104        60
OIR    2025130    131400   -9.6800 -136.9600      28.8        50       108        60
OIR    2025130    131400   -9.6800 -136.9700      28.9        50       109        60
OIR    2025130    131400   -9.6800 -136.9800      29.1        50       109        60
OIR    2025130    131400   -9.6800 -136.9900      29.2        49       108        60
OIR    2025130    131400   -9.6800 -137.0000      29.5        49       108        60
OIR    2025130    131400   -9.6800 -137.0100      29.8        48       107        60
OIR    2025130    131400   -9.6800 -137.0200      30.1        48       105        60
OIR    2025130    131400   -9.6800 -137.0300      30.4        48       105        60
OIR    2025130    131400   -9.6800 -137.0400      30.7        48       105        60
OIR    2025130    131400   -9.6800 -137.0500      30.9        48       105        60
OIR    2025130    131400   -9.6800 -137.0600      31.1        48       104        60
OIR    2025130    131400   -9.6800 -137.0700      31.3        48       104        60
OIR    2025130    131400   -9.6800 -137.0800      31.5        48       104        60
OIR    2025130    131400   -9.6800 -137.0900      31.7        48       103        60
OIR    2025130    131400   -9.6800 -137.1000      32.1        49       103        60
OIR    2025130    131400   -9.6800 -137.1100      32.3        49       103        60
OIR    2025130    131400   -9.6800 -137.1200      32.6        49       103        60
OIR    2025130    131400   -9.6800 -137.1300      32.9        50       103        60
OIR    2025130    131400   -9.6800 -137.1400      33.1        50       103        60
OIR    2025130    131400   -9.6800 -137.1500      33.4        51       103        60
OIR    2025130    131400   -9.6800 -137.1600      33.5        51       103        60
OIR    2025130    131400   -9.6800 -137.1700      33.6        51       104        60
OIR    2025130    131400   -9.6800 -137.1800      33.7        51       104        60
OIR    2025130    131400   -9.6800 -137.1900      33.8        51       105        60
OIR    2025130    131400   -9.6800 -137.2000      33.9        51       105        60
OIR    2025130    131400   -9.6800 -137.2100      33.8        52       104        60
OIR    2025130    131400   -9.6800 -137.2200      33.8        52       103        60
OIR    2025130    131400   -9.6800 -137.2300      33.7        52       103        60
OIR    2025130    131400   -9.6800 -137.2400      33.7        52       103        60
OIR    2025130    131400   -9.6800 -137.2500      33.6        52       103        60
OIR    2025130    131400   -9.6800 -137.2600      33.6        52       103        60
OIR    2025130    131400   -9.6800 -137.2700      33.5        53       103        60
OIR    2025130    131400   -9.6800 -137.2800      33.3        53       103        60
OIR    2025130    131400   -9.6800 -137.2900      33.1        53       103        60
OIR    2025130    131400   -9.6800 -137.3000      32.8        54       103        60
OIR    2025130    131400   -9.6800 -137.3100      32.1        55       103        60
OIR    2025130    131400   -9.6800 -137.3200      31.3        56       103        60
OIR    2025130    131400   -9.6800 -137.3300      30.4        57       103        60
OIR    2025130    131400   -9.6800 -137.3400      29.7        58       103        60
OIR    2025130    131400   -9.6800 -137.3500      29.4        59       103        60
OIR    2025130    131400   -9.6800 -137.3600      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4200      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.6800 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.6800 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6800 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6800 -137.4800      29.3        59       103        60
OIR    2025130    131400   -9.6800 -137.4900      29.2        59       103        60
OIR    2025130    131400   -9.6800 -137.5000      26.5        62       103        60
OIR    2025130    131400   -9.6800 -137.5100      22.3        71       103        60
OIR    2025130    131400   -9.6800 -137.5200      20.0        82       103        60
OIR    2025130    131400   -9.6800 -137.5300      17.8        91       103        60
OIR    2025130    131400   -9.6800 -137.5400      13.9       121       103        60
OIR    2025130    131400   -9.6800 -137.5500      34.9       173       103        60
OIR    2025130    131400   -9.6800 -137.5600      51.3       182       103        60
OIR    2025130    131400   -9.6800 -137.5700      56.4       175       103        60
OIR    2025130    131400   -9.6800 -137.5800      57.2       159       103        60
OIR    2025130    131400   -9.6800 -137.5900      57.0       134       103        60
OIR    2025130    131400   -9.6800 -137.6000      45.8       117       103        60
OIR    2025130    131400   -9.6800 -137.6100      29.0       108       103        60
OIR    2025130    131400   -9.6800 -137.6200      15.3        72       103        60
OIR    2025130    131400   -9.6800 -137.6300      15.1        38       103        60
OIR    2025130    131400   -9.6800 -137.6400      18.7        27       103        60
OIR    2025130    131400   -9.6800 -137.6500      21.1        20       103        60
OIR    2025130    131400   -9.6800 -137.6600      22.4        19       103        60
OIR    2025130    131400   -9.6800 -137.6700      24.2        16       103        60
OIR    2025130    131400   -9.6800 -137.6800      25.2        14       103        60
OIR    2025130    131400   -9.6800 -137.6900      25.7        11       103        60
OIR    2025130    131400   -9.6800 -137.7000      26.0         8       103        60
OIR    2025130    131400   -9.6800 -137.7100      26.3         6       103        60
OIR    2025130    131400   -9.6800 -137.7200      26.7         5       103        60
OIR    2025130    131400   -9.6800 -137.7300      27.2         3       103        60
OIR    2025130    131400   -9.6800 -137.7400      27.8         2       103        60
OIR    2025130    131400   -9.6800 -137.7500      28.6         1       103        60
OIR    2025130    131400   -9.6800 -137.7600      30.0       358       103        60
OIR    2025130    131400   -9.6800 -137.7700      30.9       357       103        60
OIR    2025130    131400   -9.6800 -137.7800      31.3       357       103        60
OIR    2025130    131400   -9.6800 -137.7900      31.5       356       103        60
OIR    2025130    131400   -9.6800 -137.8000      31.6       356       103        60
OIR    2025130    131400   -9.6800 -137.8100      31.7       356       103        60
OIR    2025130    131400   -9.6800 -137.8200      31.7       356       103        60
OIR    2025130    131400   -9.6800 -137.8300      31.7       356       103        60
OIR    2025130    131400   -9.6800 -137.8400      31.8       356       103        60
OIR    2025130    131400   -9.6800 -137.8500      31.8       356       103        60
OIR    2025130    131400   -9.6800 -137.8600      31.9       356       103        60
OIR    2025130    131400   -9.6800 -137.8700      32.0       355       103        60
OIR    2025130    131400   -9.6800 -137.8800      32.1       355       103        60
OIR    2025130    131400   -9.6800 -137.8900      32.2       354       103        60
OIR    2025130    131400   -9.6800 -137.9000      32.2       353       103        60
OIR    2025130    131400   -9.6800 -137.9100      32.1       353       104        60
OIR    2025130    131400   -9.6800 -137.9200      32.0       352       104        60
OIR    2025130    131400   -9.6800 -137.9300      31.7       351       103        60
OIR    2025130    131400   -9.6800 -137.9400      30.8       348       104        60
OIR    2025130    131400   -9.6800 -137.9500      29.7       345       107        60
OIR    2025130    131400   -9.6800 -137.9600      27.8       340       115        60
OIR    2025130    131400   -9.6800 -137.9700      26.4       336       119        60
OIR    2025130    131400   -9.6800 -137.9800      25.5       333       120        60
OIR    2025130    131400   -9.6800 -137.9900      24.8       331       121        60
OIR    2025130    131400   -9.6800 -138.0000      24.3       330       121        60
OIR    2025130    131400   -9.6800 -138.0100      24.0       330       122        60
OIR    2025130    131400   -9.6800 -138.0200      23.9       330       124        60
OIR    2025130    131400   -9.6800 -138.0300      24.0       330       125        60
OIR    2025130    131400   -9.6800 -138.0400      24.3       329       126        60
OIR    2025130    131400   -9.6800 -138.0500      24.4       329       125        60
OIR    2025130    131400   -9.6800 -138.0600      24.5       328       124        60
OIR    2025130    131400   -9.6800 -138.0700      24.7       328       126        60
OIR    2025130    131400   -9.6800 -138.0800      24.6       328       128        60
OIR    2025130    131400   -9.6800 -138.0900      24.6       327       131        60
OIR    2025130    131400   -9.6800 -138.1000      24.5       326       134        60
OIR    2025130    131400   -9.6800 -138.1100      24.4       325       138        60
OIR    2025130    131400   -9.6800 -138.1200      24.4       325       142        60
OIR    2025130    131400   -9.6800 -138.1300      24.3       324       146        60
OIR    2025130    131400   -9.6800 -138.1400      24.3       324       146        60
OIR    2025130    131400   -9.6800 -138.1500      24.2       324       145        60
OIR    2025130    131400   -9.6800 -138.1600      24.2       324       146        60
OIR    2025130    131400   -9.6800 -138.1700      24.1       324       147        60
OIR    2025130    131400   -9.6800 -138.1800      24.1       324       145        60
OIR    2025130    131400   -9.6800 -138.1900      24.1       324       143        60
OIR    2025130    131400   -9.6800 -138.2000      24.1       324       141        60
OIR    2025130    131400   -9.6800 -138.2100      24.1       324       140        60
OIR    2025130    131400   -9.6800 -138.2200      24.1       325       137        60
OIR    2025130    131400   -9.6800 -138.2300      24.2       325       137        60
OIR    2025130    131400   -9.6800 -138.2400      24.2       326       137        60
OIR    2025130    131400   -9.6800 -138.2500      24.2       326       136        60
OIR    2025130    131400   -9.6800 -138.2600      24.1       326       135        60
OIR    2025130    131400   -9.6800 -138.2700      24.0       327       134        60
OIR    2025130    131400   -9.6800 -138.2800      24.0       327       133        60
OIR    2025130    131400   -9.6800 -138.2900      23.9       328       131        60
OIR    2025130    131400   -9.6800 -138.3000      23.8       328       131        60
OIR    2025130    131400   -9.6800 -138.3100      23.7       328       130        60
OIR    2025130    131400   -9.6800 -138.3200      23.7       329       130        60
OIR    2025130    131400   -9.6800 -138.3300      23.6       329       131        60
OIR    2025130    131400   -9.6800 -138.3400      23.5       329       131        60
OIR    2025130    131400   -9.6800 -138.3500      23.4       329       131        60
OIR    2025130    131400   -9.6800 -138.3600      23.0       330       134        60
OIR    2025130    131400   -9.6800 -138.3700      22.7       331       136        60
OIR    2025130    131400   -9.6800 -138.3800      22.5       331       138        60
OIR    2025130    131400   -9.6800 -138.3900      22.4       331       139        60
OIR    2025130    131400   -9.6800 -138.4000      21.7       332       140        60
OIR    2025130    131400   -9.6800 -138.4100      21.1       333       141        60
OIR    2025130    131400   -9.6800 -138.4200      20.9       334       142        60
OIR    2025130    131400   -9.6800 -138.4300      20.8       334       145        60
OIR    2025130    131400   -9.6900 -135.9800      43.7        79       146        60
OIR    2025130    131400   -9.6900 -135.9900      43.6        79       146        60
OIR    2025130    131400   -9.6900 -136.0500      43.1        77       147        60
OIR    2025130    131400   -9.6900 -136.0600      43.0        77       144        60
OIR    2025130    131400   -9.6900 -136.0700      43.0        77       144        60
OIR    2025130    131400   -9.6900 -136.0800      43.0        77       144        60
OIR    2025130    131400   -9.6900 -136.1300      43.0        77       145        60
OIR    2025130    131400   -9.6900 -136.1700      43.9        78       141        60
OIR    2025130    131400   -9.6900 -136.1800      43.9        78       132        60
OIR    2025130    131400   -9.6900 -136.1900      43.9        78       123        60
OIR    2025130    131400   -9.6900 -136.2000      43.6        77       121        60
OIR    2025130    131400   -9.6900 -136.2100      43.4        77       121        60
OIR    2025130    131400   -9.6900 -136.2200      43.1        77       124        60
OIR    2025130    131400   -9.6900 -136.2300      43.0        78       124        60
OIR    2025130    131400   -9.6900 -136.2400      42.9        78       121        60
OIR    2025130    131400   -9.6900 -136.2500      42.8        78       122        60
OIR    2025130    131400   -9.6900 -136.2600      42.8        77       127        60
OIR    2025130    131400   -9.6900 -136.2700      42.6        77       128        60
OIR    2025130    131400   -9.6900 -136.2800      42.1        77       127        60
OIR    2025130    131400   -9.6900 -136.2900      40.7        76       127        60
OIR    2025130    131400   -9.6900 -136.3000      39.5        75       127        60
OIR    2025130    131400   -9.6900 -136.3100      39.4        75       129        60
OIR    2025130    131400   -9.6900 -136.3200      39.4        75       131        60
OIR    2025130    131400   -9.6900 -136.3300      39.4        75       134        60
OIR    2025130    131400   -9.6900 -136.3400      39.4        75       134        60
OIR    2025130    131400   -9.6900 -136.3500      39.4        75       132        60
OIR    2025130    131400   -9.6900 -136.3600      39.5        75       131        60
OIR    2025130    131400   -9.6900 -136.3700      39.5        75       129        60
OIR    2025130    131400   -9.6900 -136.3800      39.5        75       130        60
OIR    2025130    131400   -9.6900 -136.3900      39.5        75       130        60
OIR    2025130    131400   -9.6900 -136.4000      39.4        74       132        60
OIR    2025130    131400   -9.6900 -136.4100      39.3        74       134        60
OIR    2025130    131400   -9.6900 -136.4200      39.2        74       133        60
OIR    2025130    131400   -9.6900 -136.4300      38.9        74       130        60
OIR    2025130    131400   -9.6900 -136.4400      38.7        73       125        60
OIR    2025130    131400   -9.6900 -136.4500      38.4        73       123        60
OIR    2025130    131400   -9.6900 -136.4600      38.0        73       124        60
OIR    2025130    131400   -9.6900 -136.4700      37.5        73       124        60
OIR    2025130    131400   -9.6900 -136.4800      36.9        73       124        60
OIR    2025130    131400   -9.6900 -136.4900      36.5        73       125        60
OIR    2025130    131400   -9.6900 -136.5000      36.2        73       125        60
OIR    2025130    131400   -9.6900 -136.5100      35.9        73       125        60
OIR    2025130    131400   -9.6900 -136.5200      35.6        73       124        60
OIR    2025130    131400   -9.6900 -136.5300      35.1        72       123        60
OIR    2025130    131400   -9.6900 -136.5400      34.4        70       122        60
OIR    2025130    131400   -9.6900 -136.5500      34.4        70       123        60
OIR    2025130    131400   -9.6900 -136.5600      34.4        70       123        60
OIR    2025130    131400   -9.6900 -136.5700      34.4        70       122        60
OIR    2025130    131400   -9.6900 -136.5800      34.4        70       121        60
OIR    2025130    131400   -9.6900 -136.5900      34.4        70       120        60
OIR    2025130    131400   -9.6900 -136.6000      34.4        70       121        60
OIR    2025130    131400   -9.6900 -136.6100      34.4        70       121        60
OIR    2025130    131400   -9.6900 -136.6200      34.4        70       121        60
OIR    2025130    131400   -9.6900 -136.6300      34.4        70       122        60
OIR    2025130    131400   -9.6900 -136.6400      34.4        70       124        60
OIR    2025130    131400   -9.6900 -136.6500      34.3        70       127        60
OIR    2025130    131400   -9.6900 -136.6600      34.1        70       130        60
OIR    2025130    131400   -9.6900 -136.6700      33.8        70       133        60
OIR    2025130    131400   -9.6900 -136.6800      33.5        70       133        60
OIR    2025130    131400   -9.6900 -136.6900      32.7        70       133        60
OIR    2025130    131400   -9.6900 -136.7000      31.8        70       131        60
OIR    2025130    131400   -9.6900 -136.7100      31.3        70       129        60
OIR    2025130    131400   -9.6900 -136.7200      30.9        70       128        60
OIR    2025130    131400   -9.6900 -136.7300      30.6        70       126        60
OIR    2025130    131400   -9.6900 -136.7400      30.3        69       125        60
OIR    2025130    131400   -9.6900 -136.7500      29.5        68       122        60
OIR    2025130    131400   -9.6900 -136.7600      28.3        66       119        60
OIR    2025130    131400   -9.6900 -136.7700      27.7        63       119        60
OIR    2025130    131400   -9.6900 -136.7800      27.5        62       119        60
OIR    2025130    131400   -9.6900 -136.7900      27.4        61       115        60
OIR    2025130    131400   -9.6900 -136.8000      27.5        60       115        60
OIR    2025130    131400   -9.6900 -136.8100      27.5        59       116        60
OIR    2025130    131400   -9.6900 -136.8200      27.6        59       116        60
OIR    2025130    131400   -9.6900 -136.8300      27.5        58       116        60
OIR    2025130    131400   -9.6900 -136.8400      27.4        58       114        60
OIR    2025130    131400   -9.6900 -136.8500      27.4        58       111        60
OIR    2025130    131400   -9.6900 -136.8600      27.4        58       107        60
OIR    2025130    131400   -9.6900 -136.8700      27.6        57       104        60
OIR    2025130    131400   -9.6900 -136.8800      27.8        56       104        60
OIR    2025130    131400   -9.6900 -136.8900      27.9        55       103        60
OIR    2025130    131400   -9.6900 -136.9000      28.0        54       103        60
OIR    2025130    131400   -9.6900 -136.9100      28.1        54       103        60
OIR    2025130    131400   -9.6900 -136.9200      28.4        53       103        60
OIR    2025130    131400   -9.6900 -136.9300      28.5        52       103        60
OIR    2025130    131400   -9.6900 -136.9400      28.6        51       103        60
OIR    2025130    131400   -9.6900 -136.9500      28.8        50       104        60
OIR    2025130    131400   -9.6900 -136.9600      28.9        50       108        60
OIR    2025130    131400   -9.6900 -136.9700      29.0        50       108        60
OIR    2025130    131400   -9.6900 -136.9800      29.1        49       108        60
OIR    2025130    131400   -9.6900 -136.9900      29.2        49       107        60
OIR    2025130    131400   -9.6900 -137.0000      29.5        49       107        60
OIR    2025130    131400   -9.6900 -137.0100      29.8        48       105        60
OIR    2025130    131400   -9.6900 -137.0200      30.1        48       105        60
OIR    2025130    131400   -9.6900 -137.0300      30.4        48       105        60
OIR    2025130    131400   -9.6900 -137.0400      30.7        47       105        60
OIR    2025130    131400   -9.6900 -137.0500      30.8        47       105        60
OIR    2025130    131400   -9.6900 -137.0600      31.0        47       104        60
OIR    2025130    131400   -9.6900 -137.0700      31.2        47       104        60
OIR    2025130    131400   -9.6900 -137.0800      31.4        48       104        60
OIR    2025130    131400   -9.6900 -137.0900      31.6        48       103        60
OIR    2025130    131400   -9.6900 -137.1000      31.9        48       103        60
OIR    2025130    131400   -9.6900 -137.1100      32.2        48       103        60
OIR    2025130    131400   -9.6900 -137.1200      32.5        49       103        60
OIR    2025130    131400   -9.6900 -137.1300      32.8        49       103        60
OIR    2025130    131400   -9.6900 -137.1400      33.0        50       103        60
OIR    2025130    131400   -9.6900 -137.1500      33.3        50       103        60
OIR    2025130    131400   -9.6900 -137.1600      33.5        51       103        60
OIR    2025130    131400   -9.6900 -137.1700      33.7        51       103        60
OIR    2025130    131400   -9.6900 -137.1800      33.7        51       104        60
OIR    2025130    131400   -9.6900 -137.1900      33.8        51       105        60
OIR    2025130    131400   -9.6900 -137.2000      33.9        51       107        60
OIR    2025130    131400   -9.6900 -137.2100      33.9        51       104        60
OIR    2025130    131400   -9.6900 -137.2200      33.9        51       103        60
OIR    2025130    131400   -9.6900 -137.2300      33.8        52       103        60
OIR    2025130    131400   -9.6900 -137.2400      33.8        52       103        60
OIR    2025130    131400   -9.6900 -137.2500      33.8        52       103        60
OIR    2025130    131400   -9.6900 -137.2600      33.8        52       103        60
OIR    2025130    131400   -9.6900 -137.2700      33.7        52       103        60
OIR    2025130    131400   -9.6900 -137.2800      33.6        52       103        60
OIR    2025130    131400   -9.6900 -137.2900      33.5        53       103        60
OIR    2025130    131400   -9.6900 -137.3000      33.3        53       103        60
OIR    2025130    131400   -9.6900 -137.3100      32.8        54       103        60
OIR    2025130    131400   -9.6900 -137.3200      32.1        55       103        60
OIR    2025130    131400   -9.6900 -137.3300      30.9        56       103        60
OIR    2025130    131400   -9.6900 -137.3400      29.9        58       103        60
OIR    2025130    131400   -9.6900 -137.3500      29.4        58       103        60
OIR    2025130    131400   -9.6900 -137.3600      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.3700      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.3800      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.4000      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.4100      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.4200      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4300      29.3        59       103        60
OIR    2025130    131400   -9.6900 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.6900 -137.4900      29.2        60       103        60
OIR    2025130    131400   -9.6900 -137.5000      27.3        63       103        60
OIR    2025130    131400   -9.6900 -137.5100      22.9        76       103        60
OIR    2025130    131400   -9.6900 -137.5200      20.6        86       103        60
OIR    2025130    131400   -9.6900 -137.5300      18.7        95       103        60
OIR    2025130    131400   -9.6900 -137.5400      18.3       119       103        60
OIR    2025130    131400   -9.6900 -137.5500      23.1       144       103        60
OIR    2025130    131400   -9.6900 -137.5600      28.7       157       103        60
OIR    2025130    131400   -9.6900 -137.5700      34.3       162       103        60
OIR    2025130    131400   -9.6900 -137.5800      35.4       155       103        60
OIR    2025130    131400   -9.6900 -137.5900      33.3       142       103        60
OIR    2025130    131400   -9.6900 -137.6000      28.9       124       103        60
OIR    2025130    131400   -9.6900 -137.6100      19.0       101       103        60
OIR    2025130    131400   -9.6900 -137.6200      13.4        72       103        60
OIR    2025130    131400   -9.6900 -137.6300      14.6        40       103        60
OIR    2025130    131400   -9.6900 -137.6400      18.8        28       103        60
OIR    2025130    131400   -9.6900 -137.6500      22.1        24       103        60
OIR    2025130    131400   -9.6900 -137.6600      24.2        20       103        60
OIR    2025130    131400   -9.6900 -137.6700      25.6        16       103        60
OIR    2025130    131400   -9.6900 -137.6800      26.8        14       103        60
OIR    2025130    131400   -9.6900 -137.6900      27.5        12       103        60
OIR    2025130    131400   -9.6900 -137.7000      27.6         9       103        60
OIR    2025130    131400   -9.6900 -137.7100      27.7         7       103        60
OIR    2025130    131400   -9.6900 -137.7200      27.9         6       103        60
OIR    2025130    131400   -9.6900 -137.7300      28.3         4       103        60
OIR    2025130    131400   -9.6900 -137.7400      28.7         3       103        60
OIR    2025130    131400   -9.6900 -137.7500      29.3         2       103        60
OIR    2025130    131400   -9.6900 -137.7600      30.5       359       103        60
OIR    2025130    131400   -9.6900 -137.7700      31.2       357       103        60
OIR    2025130    131400   -9.6900 -137.7800      31.5       357       103        60
OIR    2025130    131400   -9.6900 -137.7900      31.7       357       103        60
OIR    2025130    131400   -9.6900 -137.8000      31.8       356       103        60
OIR    2025130    131400   -9.6900 -137.8100      31.8       356       103        60
OIR    2025130    131400   -9.6900 -137.8200      31.9       356       103        60
OIR    2025130    131400   -9.6900 -137.8300      31.9       356       103        60
OIR    2025130    131400   -9.6900 -137.8400      31.9       356       103        60
OIR    2025130    131400   -9.6900 -137.8500      32.0       356       103        60
OIR    2025130    131400   -9.6900 -137.8600      32.1       355       103        60
OIR    2025130    131400   -9.6900 -137.8700      32.2       355       103        60
OIR    2025130    131400   -9.6900 -137.8800      32.4       354       103        60
OIR    2025130    131400   -9.6900 -137.8900      32.5       354       103        60
OIR    2025130    131400   -9.6900 -137.9000      32.6       353       103        60
OIR    2025130    131400   -9.6900 -137.9100      32.6       353       103        60
OIR    2025130    131400   -9.6900 -137.9200      32.6       353       103        60
OIR    2025130    131400   -9.6900 -137.9300      32.4       352       103        60
OIR    2025130    131400   -9.6900 -137.9400      31.8       350       104        60
OIR    2025130    131400   -9.6900 -137.9500      30.9       348       107        60
OIR    2025130    131400   -9.6900 -137.9600      28.9       344       115        60
OIR    2025130    131400   -9.6900 -137.9700      27.2       339       119        60
OIR    2025130    131400   -9.6900 -137.9800      26.2       336       119        60
OIR    2025130    131400   -9.6900 -137.9900      25.2       333       119        60
OIR    2025130    131400   -9.6900 -138.0000      24.6       332       119        60
OIR    2025130    131400   -9.6900 -138.0100      24.2       332       121        60
OIR    2025130    131400   -9.6900 -138.0200      24.1       332       123        60
OIR    2025130    131400   -9.6900 -138.0300      24.1       332       123        60
OIR    2025130    131400   -9.6900 -138.0400      24.3       331       123        60
OIR    2025130    131400   -9.6900 -138.0500      24.5       331       122        60
OIR    2025130    131400   -9.6900 -138.0600      24.6       330       121        60
OIR    2025130    131400   -9.6900 -138.0700      24.9       329       124        60
OIR    2025130    131400   -9.6900 -138.0800      24.8       329       127        60
OIR    2025130    131400   -9.6900 -138.0900      24.6       328       130        60
OIR    2025130    131400   -9.6900 -138.1000      24.6       327       133        60
OIR    2025130    131400   -9.6900 -138.1100      24.6       326       136        60
OIR    2025130    131400   -9.6900 -138.1200      24.6       325       140        60
OIR    2025130    131400   -9.6900 -138.1300      24.6       324       142        60
OIR    2025130    131400   -9.6900 -138.1400      24.5       324       142        60
OIR    2025130    131400   -9.6900 -138.1500      24.4       324       142        60
OIR    2025130    131400   -9.6900 -138.1600      24.3       324       144        60
OIR    2025130    131400   -9.6900 -138.1700      24.2       324       145        60
OIR    2025130    131400   -9.6900 -138.1800      24.2       324       144        60
OIR    2025130    131400   -9.6900 -138.1900      24.2       324       142        60
OIR    2025130    131400   -9.6900 -138.2000      24.3       324       140        60
OIR    2025130    131400   -9.6900 -138.2100      24.3       324       138        60
OIR    2025130    131400   -9.6900 -138.2200      24.3       325       137        60
OIR    2025130    131400   -9.6900 -138.2300      24.3       325       137        60
OIR    2025130    131400   -9.6900 -138.2400      24.3       326       139        60
OIR    2025130    131400   -9.6900 -138.2500      24.3       326       137        60
OIR    2025130    131400   -9.6900 -138.2600      24.2       327       135        60
OIR    2025130    131400   -9.6900 -138.2700      24.2       327       134        60
OIR    2025130    131400   -9.6900 -138.2800      24.1       328       133        60
OIR    2025130    131400   -9.6900 -138.2900      24.0       328       132        60
OIR    2025130    131400   -9.6900 -138.3000      23.9       328       131        60
OIR    2025130    131400   -9.6900 -138.3100      23.8       328       130        60
OIR    2025130    131400   -9.6900 -138.3200      23.8       329       130        60
OIR    2025130    131400   -9.6900 -138.3300      23.7       329       130        60
OIR    2025130    131400   -9.6900 -138.3400      23.6       329       130        60
OIR    2025130    131400   -9.6900 -138.3500      23.5       329       130        60
OIR    2025130    131400   -9.6900 -138.3600      23.1       330       133        60
OIR    2025130    131400   -9.6900 -138.3700      22.9       330       135        60
OIR    2025130    131400   -9.6900 -138.3800      22.6       331       137        60
OIR    2025130    131400   -9.6900 -138.3900      22.3       331       138        60
OIR    2025130    131400   -9.6900 -138.4000      21.6       332       139        60
OIR    2025130    131400   -9.6900 -138.4100      21.0       333       140        60
OIR    2025130    131400   -9.6900 -138.4200      20.8       334       141        60
OIR    2025130    131400   -9.6900 -138.4300      20.7       334       144        60
OIR    2025130    131400   -9.7000 -136.0600      43.0        77       144        60
OIR    2025130    131400   -9.7000 -136.0700      43.0        77       144        60
OIR    2025130    131400   -9.7000 -136.0800      43.0        77       145        60
OIR    2025130    131400   -9.7000 -136.1300      43.0        77       146        60
OIR    2025130    131400   -9.7000 -136.1400      43.7        77       146        60
OIR    2025130    131400   -9.7000 -136.1700      44.0        77       142        60
OIR    2025130    131400   -9.7000 -136.1800      44.0        77       132        60
OIR    2025130    131400   -9.7000 -136.1900      43.9        77       123        60
OIR    2025130    131400   -9.7000 -136.2000      43.8        77       121        60
OIR    2025130    131400   -9.7000 -136.2100      43.6        77       122        60
OIR    2025130    131400   -9.7000 -136.2200      43.4        78       126        60
OIR    2025130    131400   -9.7000 -136.2300      43.0        78       125        60
OIR    2025130    131400   -9.7000 -136.2400      42.9        78       121        60
OIR    2025130    131400   -9.7000 -136.2500      42.8        78       121        60
OIR    2025130    131400   -9.7000 -136.2600      42.8        78       127        60
OIR    2025130    131400   -9.7000 -136.2700      42.7        78       128        60
OIR    2025130    131400   -9.7000 -136.2800      42.3        77       127        60
OIR    2025130    131400   -9.7000 -136.2900      41.3        77       127        60
OIR    2025130    131400   -9.7000 -136.3000      39.9        76       127        60
OIR    2025130    131400   -9.7000 -136.3100      39.5        75       129        60
OIR    2025130    131400   -9.7000 -136.3200      39.4        75       132        60
OIR    2025130    131400   -9.7000 -136.3300      39.4        75       135        60
OIR    2025130    131400   -9.7000 -136.3400      39.4        75       135        60
OIR    2025130    131400   -9.7000 -136.3500      39.5        75       133        60
OIR    2025130    131400   -9.7000 -136.3600      39.5        75       131        60
OIR    2025130    131400   -9.7000 -136.3700      39.6        75       129        60
OIR    2025130    131400   -9.7000 -136.3800      39.6        74       129        60
OIR    2025130    131400   -9.7000 -136.3900      39.7        74       131        60
OIR    2025130    131400   -9.7000 -136.4000      39.7        74       133        60
OIR    2025130    131400   -9.7000 -136.4100      39.8        74       135        60
OIR    2025130    131400   -9.7000 -136.4200      39.8        74       135        60
OIR    2025130    131400   -9.7000 -136.4300      39.2        73       132        60
OIR    2025130    131400   -9.7000 -136.4400      39.0        73       126        60
OIR    2025130    131400   -9.7000 -136.4500      38.6        72       124        60
OIR    2025130    131400   -9.7000 -136.4600      38.3        72       124        60
OIR    2025130    131400   -9.7000 -136.4700      37.7        72       124        60
OIR    2025130    131400   -9.7000 -136.4800      36.9        73       123        60
OIR    2025130    131400   -9.7000 -136.4900      36.4        73       123        60
OIR    2025130    131400   -9.7000 -136.5000      36.1        73       124        60
OIR    2025130    131400   -9.7000 -136.5100      35.8        73       124        60
OIR    2025130    131400   -9.7000 -136.5200      35.5        72       125        60
OIR    2025130    131400   -9.7000 -136.5300      34.8        72       125        60
OIR    2025130    131400   -9.7000 -136.5400      34.3        70       125        60
OIR    2025130    131400   -9.7000 -136.5500      34.3        70       126        60
OIR    2025130    131400   -9.7000 -136.5600      34.3        70       125        60
OIR    2025130    131400   -9.7000 -136.5700      34.4        70       123        60
OIR    2025130    131400   -9.7000 -136.5800      34.4        70       122        60
OIR    2025130    131400   -9.7000 -136.5900      34.4        70       121        60
OIR    2025130    131400   -9.7000 -136.6000      34.4        70       121        60
OIR    2025130    131400   -9.7000 -136.6100      34.4        70       122        60
OIR    2025130    131400   -9.7000 -136.6200      34.4        70       122        60
OIR    2025130    131400   -9.7000 -136.6300      34.4        71       122        60
OIR    2025130    131400   -9.7000 -136.6400      34.4        71       124        60
OIR    2025130    131400   -9.7000 -136.6500      34.3        71       126        60
OIR    2025130    131400   -9.7000 -136.6600      34.0        71       129        60
OIR    2025130    131400   -9.7000 -136.6700      33.9        71       132        60
OIR    2025130    131400   -9.7000 -136.6800      33.7        70       133        60
OIR    2025130    131400   -9.7000 -136.6900      33.2        70       134        60
OIR    2025130    131400   -9.7000 -136.7000      32.2        70       133        60
OIR    2025130    131400   -9.7000 -136.7100      31.6        70       132        60
OIR    2025130    131400   -9.7000 -136.7200      31.2        70       130        60
OIR    2025130    131400   -9.7000 -136.7300      30.7        69       129        60
OIR    2025130    131400   -9.7000 -136.7400      30.0        69       127        60
OIR    2025130    131400   -9.7000 -136.7500      28.7        67       124        60
OIR    2025130    131400   -9.7000 -136.7600      27.5        64       122        60
OIR    2025130    131400   -9.7000 -136.7700      27.1        63       121        60
OIR    2025130    131400   -9.7000 -136.7800      27.0        61       120        60
OIR    2025130    131400   -9.7000 -136.7900      27.1        60       119        60
OIR    2025130    131400   -9.7000 -136.8000      27.3        59       117        60
OIR    2025130    131400   -9.7000 -136.8100      27.4        58       119        60
OIR    2025130    131400   -9.7000 -136.8200      27.5        58       117        60
OIR    2025130    131400   -9.7000 -136.8300      27.6        57       116        60
OIR    2025130    131400   -9.7000 -136.8400      27.6        57       114        60
OIR    2025130    131400   -9.7000 -136.8500      27.6        57       112        60
OIR    2025130    131400   -9.7000 -136.8600      27.7        56       108        60
OIR    2025130    131400   -9.7000 -136.8700      27.8        55       104        60
OIR    2025130    131400   -9.7000 -136.8800      27.9        54       104        60
OIR    2025130    131400   -9.7000 -136.8900      28.0        54       103        60
OIR    2025130    131400   -9.7000 -136.9000      28.0        53       103        60
OIR    2025130    131400   -9.7000 -136.9100      28.2        52       103        60
OIR    2025130    131400   -9.7000 -136.9200      28.5        51       103        60
OIR    2025130    131400   -9.7000 -136.9300      28.6        51       103        60
OIR    2025130    131400   -9.7000 -136.9400      28.8        50       103        60
OIR    2025130    131400   -9.7000 -136.9500      28.8        50       104        60
OIR    2025130    131400   -9.7000 -136.9600      28.9        50       107        60
OIR    2025130    131400   -9.7000 -136.9700      29.0        50       108        60
OIR    2025130    131400   -9.7000 -136.9800      29.1        49       108        60
OIR    2025130    131400   -9.7000 -136.9900      29.2        49       108        60
OIR    2025130    131400   -9.7000 -137.0000      29.4        48       108        60
OIR    2025130    131400   -9.7000 -137.0100      29.8        48       108        60
OIR    2025130    131400   -9.7000 -137.0200      30.1        47       108        60
OIR    2025130    131400   -9.7000 -137.0300      30.4        47       108        60
OIR    2025130    131400   -9.7000 -137.0400      30.6        47       107        60
OIR    2025130    131400   -9.7000 -137.0500      30.8        47       107        60
OIR    2025130    131400   -9.7000 -137.0600      31.0        47       105        60
OIR    2025130    131400   -9.7000 -137.0700      31.2        47       105        60
OIR    2025130    131400   -9.7000 -137.0800      31.4        47       104        60
OIR    2025130    131400   -9.7000 -137.0900      31.6        47       104        60
OIR    2025130    131400   -9.7000 -137.1000      31.8        47       104        60
OIR    2025130    131400   -9.7000 -137.1100      32.0        48       103        60
OIR    2025130    131400   -9.7000 -137.1200      32.3        48       103        60
OIR    2025130    131400   -9.7000 -137.1300      32.6        49       103        60
OIR    2025130    131400   -9.7000 -137.1400      32.9        49       103        60
OIR    2025130    131400   -9.7000 -137.1500      33.2        50       103        60
OIR    2025130    131400   -9.7000 -137.1600      33.5        51       103        60
OIR    2025130    131400   -9.7000 -137.1700      33.7        51       103        60
OIR    2025130    131400   -9.7000 -137.1800      33.7        51       103        60
OIR    2025130    131400   -9.7000 -137.1900      33.8        51       105        60
OIR    2025130    131400   -9.7000 -137.2000      33.9        51       107        60
OIR    2025130    131400   -9.7000 -137.2100      33.9        51       105        60
OIR    2025130    131400   -9.7000 -137.2200      33.9        51       104        60
OIR    2025130    131400   -9.7000 -137.2300      33.9        51       104        60
OIR    2025130    131400   -9.7000 -137.2400      33.9        51       103        60
OIR    2025130    131400   -9.7000 -137.2500      33.9        52       103        60
OIR    2025130    131400   -9.7000 -137.2600      33.9        52       103        60
OIR    2025130    131400   -9.7000 -137.2700      33.9        52       103        60
OIR    2025130    131400   -9.7000 -137.2800      33.8        52       103        60
OIR    2025130    131400   -9.7000 -137.2900      33.8        52       103        60
OIR    2025130    131400   -9.7000 -137.3000      33.6        53       103        60
OIR    2025130    131400   -9.7000 -137.3100      33.3        53       103        60
OIR    2025130    131400   -9.7000 -137.3200      32.8        54       103        60
OIR    2025130    131400   -9.7000 -137.3300      31.7        55       103        60
OIR    2025130    131400   -9.7000 -137.3400      30.3        57       103        60
OIR    2025130    131400   -9.7000 -137.3500      29.6        58       103        60
OIR    2025130    131400   -9.7000 -137.3600      29.4        58       103        60
OIR    2025130    131400   -9.7000 -137.3700      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.3800      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.3900      29.3        59       103        60
OIR    2025130    131400   -9.7000 -137.4000      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4100      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4200      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4300      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.7000 -137.4900      29.2        60       103        60
OIR    2025130    131400   -9.7000 -137.5000      28.0        63       103        60
OIR    2025130    131400   -9.7000 -137.5100      24.7        75       103        60
OIR    2025130    131400   -9.7000 -137.5200      22.3        84       103        60
OIR    2025130    131400   -9.7000 -137.5300      20.6        91       103        60
OIR    2025130    131400   -9.7000 -137.5400      19.9       108       103        60
OIR    2025130    131400   -9.7000 -137.5500      19.9       133       103        60
OIR    2025130    131400   -9.7000 -137.5600      21.1       140       103        60
OIR    2025130    131400   -9.7000 -137.5700      21.1       140       103        60
OIR    2025130    131400   -9.7000 -137.5800      20.7       137       103        60
OIR    2025130    131400   -9.7000 -137.5900      18.8       129       103        60
OIR    2025130    131400   -9.7000 -137.6000      16.2       114       103        60
OIR    2025130    131400   -9.7000 -137.6100      14.3        94       103        60
OIR    2025130    131400   -9.7000 -137.6200      13.9        76       103        60
OIR    2025130    131400   -9.7000 -137.6300      15.7        54       103        60
OIR    2025130    131400   -9.7000 -137.6400      19.5        37       103        60
OIR    2025130    131400   -9.7000 -137.6500      23.6        27       103        60
OIR    2025130    131400   -9.7000 -137.6600      25.9        21       103        60
OIR    2025130    131400   -9.7000 -137.6700      27.5        16       103        60
OIR    2025130    131400   -9.7000 -137.6800      28.5        14       103        60
OIR    2025130    131400   -9.7000 -137.6900      29.2        12       103        60
OIR    2025130    131400   -9.7000 -137.7000      29.1        10       103        60
OIR    2025130    131400   -9.7000 -137.7100      29.1         8       103        60
OIR    2025130    131400   -9.7000 -137.7200      29.2         7       103        60
OIR    2025130    131400   -9.7000 -137.7300      29.4         5       103        60
OIR    2025130    131400   -9.7000 -137.7400      29.7         4       103        60
OIR    2025130    131400   -9.7000 -137.7500      30.3         2       103        60
OIR    2025130    131400   -9.7000 -137.7600      31.1       360       103        60
OIR    2025130    131400   -9.7000 -137.7700      31.6       358       103        60
OIR    2025130    131400   -9.7000 -137.7800      31.8       357       103        60
OIR    2025130    131400   -9.7000 -137.7900      31.9       357       103        60
OIR    2025130    131400   -9.7000 -137.8000      31.9       356       103        60
OIR    2025130    131400   -9.7000 -137.8100      32.0       356       103        60
OIR    2025130    131400   -9.7000 -137.8200      32.0       356       103        60
OIR    2025130    131400   -9.7000 -137.8300      32.1       356       103        60
OIR    2025130    131400   -9.7000 -137.8400      32.1       356       103        60
OIR    2025130    131400   -9.7000 -137.8500      32.2       355       103        60
OIR    2025130    131400   -9.7000 -137.8600      32.4       355       103        60
OIR    2025130    131400   -9.7000 -137.8700      32.5       354       103        60
OIR    2025130    131400   -9.7000 -137.8800      32.6       354       103        60
OIR    2025130    131400   -9.7000 -137.8900      32.7       353       103        60
OIR    2025130    131400   -9.7000 -137.9000      32.8       353       104        60
OIR    2025130    131400   -9.7000 -137.9100      32.8       353       104        60
OIR    2025130    131400   -9.7000 -137.9200      32.8       353       104        60
OIR    2025130    131400   -9.7000 -137.9300      32.7       352       103        60
OIR    2025130    131400   -9.7000 -137.9400      32.4       351       104        60
OIR    2025130    131400   -9.7000 -137.9500      31.8       350       105        60
OIR    2025130    131400   -9.7000 -137.9600      30.7       348       113        60
OIR    2025130    131400   -9.7000 -137.9700      29.6       345       116        60
OIR    2025130    131400   -9.7000 -137.9800      28.5       342       117        60
OIR    2025130    131400   -9.7000 -137.9900      27.4       340       117        60
OIR    2025130    131400   -9.7000 -138.0000      26.4       339       117        60
OIR    2025130    131400   -9.7000 -138.0100      25.5       337       119        60
OIR    2025130    131400   -9.7000 -138.0200      24.8       336       121        60
OIR    2025130    131400   -9.7000 -138.0300      24.4       335       120        60
OIR    2025130    131400   -9.7000 -138.0400      24.4       334       119        60
OIR    2025130    131400   -9.7000 -138.0500      24.5       334       119        60
OIR    2025130    131400   -9.7000 -138.0600      24.6       334       120        60
OIR    2025130    131400   -9.7000 -138.0700      25.0       332       123        60
OIR    2025130    131400   -9.7000 -138.0800      24.9       331       126        60
OIR    2025130    131400   -9.7000 -138.0900      24.9       328       130        60
OIR    2025130    131400   -9.7000 -138.1000      25.0       327       133        60
OIR    2025130    131400   -9.7000 -138.1100      25.2       326       138        60
OIR    2025130    131400   -9.7000 -138.1200      25.5       325       141        60
OIR    2025130    131400   -9.7000 -138.1300      25.6       325       144        60
OIR    2025130    131400   -9.7000 -138.1400      25.4       324       143        60
OIR    2025130    131400   -9.7000 -138.1500      25.2       324       142        60
OIR    2025130    131400   -9.7000 -138.1600      24.9       324       143        60
OIR    2025130    131400   -9.7000 -138.1700      24.8       324       145        60
OIR    2025130    131400   -9.7000 -138.1800      24.8       324       143        60
OIR    2025130    131400   -9.7000 -138.1900      24.8       325       141        60
OIR    2025130    131400   -9.7000 -138.2000      24.8       325       138        60
OIR    2025130    131400   -9.7000 -138.2100      25.0       325       137        60
OIR    2025130    131400   -9.7000 -138.2200      24.9       326       136        60
OIR    2025130    131400   -9.7000 -138.2300      24.8       326       137        60
OIR    2025130    131400   -9.7000 -138.2400      24.6       326       138        60
OIR    2025130    131400   -9.7000 -138.2500      24.5       327       136        60
OIR    2025130    131400   -9.7000 -138.2600      24.4       327       135        60
OIR    2025130    131400   -9.7000 -138.2700      24.3       327       134        60
OIR    2025130    131400   -9.7000 -138.2800      24.2       328       133        60
OIR    2025130    131400   -9.7000 -138.2900      24.1       328       132        60
OIR    2025130    131400   -9.7000 -138.3000      24.1       328       131        60
OIR    2025130    131400   -9.7000 -138.3100      24.0       328       130        60
OIR    2025130    131400   -9.7000 -138.3200      23.9       329       130        60
OIR    2025130    131400   -9.7000 -138.3300      23.8       329       130        60
OIR    2025130    131400   -9.7000 -138.3400      23.8       329       130        60
OIR    2025130    131400   -9.7000 -138.3500      23.6       329       130        60
OIR    2025130    131400   -9.7000 -138.3600      23.2       330       133        60
OIR    2025130    131400   -9.7000 -138.3700      23.0       330       135        60
OIR    2025130    131400   -9.7000 -138.3800      22.7       331       137        60
OIR    2025130    131400   -9.7000 -138.3900      22.2       331       138        60
OIR    2025130    131400   -9.7000 -138.4000      21.5       333       139        60
OIR    2025130    131400   -9.7000 -138.4100      20.9       334       140        60
OIR    2025130    131400   -9.7000 -138.4200      20.7       334       142        60
OIR    2025130    131400   -9.7000 -138.4300      20.6       334       144        60
OIR    2025130    131400   -9.7100 -136.0600      43.0        77       144        60
OIR    2025130    131400   -9.7100 -136.0700      43.0        77       145        60
OIR    2025130    131400   -9.7100 -136.0800      43.0        77       146        60
OIR    2025130    131400   -9.7100 -136.1300      43.0        77       146        60
OIR    2025130    131400   -9.7100 -136.1400      43.7        77       145        60
OIR    2025130    131400   -9.7100 -136.1600      43.9        77       147        60
OIR    2025130    131400   -9.7100 -136.1700      44.0        77       144        60
OIR    2025130    131400   -9.7100 -136.1800      43.9        77       134        60
OIR    2025130    131400   -9.7100 -136.1900      43.9        77       125        60
OIR    2025130    131400   -9.7100 -136.2000      43.9        77       123        60
OIR    2025130    131400   -9.7100 -136.2100      43.7        77       123        60
OIR    2025130    131400   -9.7100 -136.2200      43.6        78       129        60
OIR    2025130    131400   -9.7100 -136.2300      42.9        78       127        60
OIR    2025130    131400   -9.7100 -136.2400      42.9        78       121        60
OIR    2025130    131400   -9.7100 -136.2500      42.8        78       120        60
OIR    2025130    131400   -9.7100 -136.2600      42.8        78       126        60
OIR    2025130    131400   -9.7100 -136.2700      42.8        78       128        60
OIR    2025130    131400   -9.7100 -136.2800      42.5        78       128        60
OIR    2025130    131400   -9.7100 -136.2900      42.1        78       128        60
OIR    2025130    131400   -9.7100 -136.3000      41.0        77       128        60
OIR    2025130    131400   -9.7100 -136.3100      40.0        76       130        60
OIR    2025130    131400   -9.7100 -136.3200      39.6        75       132        60
OIR    2025130    131400   -9.7100 -136.3300      39.5        75       136        60
OIR    2025130    131400   -9.7100 -136.3400      39.5        75       135        60
OIR    2025130    131400   -9.7100 -136.3500      39.5        75       133        60
OIR    2025130    131400   -9.7100 -136.3600      39.6        75       131        60
OIR    2025130    131400   -9.7100 -136.3700      39.7        74       128        60
OIR    2025130    131400   -9.7100 -136.3800      39.8        74       129        60
OIR    2025130    131400   -9.7100 -136.3900      39.8        74       131        60
OIR    2025130    131400   -9.7100 -136.4000      39.9        74       134        60
OIR    2025130    131400   -9.7100 -136.4100      40.1        74       137        60
OIR    2025130    131400   -9.7100 -136.4200      40.1        73       137        60
OIR    2025130    131400   -9.7100 -136.4300      39.2        72       135        60
OIR    2025130    131400   -9.7100 -136.4400      39.1        72       128        60
OIR    2025130    131400   -9.7100 -136.4500      38.8        72       126        60
OIR    2025130    131400   -9.7100 -136.4600      38.6        72       124        60
OIR    2025130    131400   -9.7100 -136.4700      37.9        72       123        60
OIR    2025130    131400   -9.7100 -136.4800      36.7        73       123        60
OIR    2025130    131400   -9.7100 -136.4900      36.3        73       122        60
OIR    2025130    131400   -9.7100 -136.5000      35.9        73       122        60
OIR    2025130    131400   -9.7100 -136.5100      35.6        73       124        60
OIR    2025130    131400   -9.7100 -136.5200      35.2        72       125        60
OIR    2025130    131400   -9.7100 -136.5300      34.3        71       127        60
OIR    2025130    131400   -9.7100 -136.5400      34.0        70       128        60
OIR    2025130    131400   -9.7100 -136.5500      34.1        70       128        60
OIR    2025130    131400   -9.7100 -136.5600      34.2        70       126        60
OIR    2025130    131400   -9.7100 -136.5700      34.3        70       124        60
OIR    2025130    131400   -9.7100 -136.5800      34.4        70       123        60
OIR    2025130    131400   -9.7100 -136.5900      34.4        71       122        60
OIR    2025130    131400   -9.7100 -136.6000      34.4        71       122        60
OIR    2025130    131400   -9.7100 -136.6100      34.4        71       123        60
OIR    2025130    131400   -9.7100 -136.6200      34.4        71       122        60
OIR    2025130    131400   -9.7100 -136.6300      34.3        71       122        60
OIR    2025130    131400   -9.7100 -136.6400      34.3        71       123        60
OIR    2025130    131400   -9.7100 -136.6500      34.2        71       125        60
OIR    2025130    131400   -9.7100 -136.6600      34.0        71       129        60
OIR    2025130    131400   -9.7100 -136.6700      33.8        71       131        60
OIR    2025130    131400   -9.7100 -136.6800      33.6        71       133        60
OIR    2025130    131400   -9.7100 -136.6900      33.3        70       134        60
OIR    2025130    131400   -9.7100 -136.7000      32.5        70       136        60
OIR    2025130    131400   -9.7100 -136.7100      31.9        70       134        60
OIR    2025130    131400   -9.7100 -136.7200      31.5        69       133        60
OIR    2025130    131400   -9.7100 -136.7300      30.9        69       131        60
OIR    2025130    131400   -9.7100 -136.7400      29.2        68       130        60
OIR    2025130    131400   -9.7100 -136.7500      27.5        66       126        60
OIR    2025130    131400   -9.7100 -136.7600      26.3        63       124        60
OIR    2025130    131400   -9.7100 -136.7700      26.1        62       123        60
OIR    2025130    131400   -9.7100 -136.7800      26.5        60       122        60
OIR    2025130    131400   -9.7100 -136.7900      26.8        59       122        60
OIR    2025130    131400   -9.7100 -136.8000      27.1        58       122        60
OIR    2025130    131400   -9.7100 -136.8100      27.4        57       121        60
OIR    2025130    131400   -9.7100 -136.8200      27.5        56       117        60
OIR    2025130    131400   -9.7100 -136.8300      27.7        56       116        60
OIR    2025130    131400   -9.7100 -136.8400      27.7        56       114        60
OIR    2025130    131400   -9.7100 -136.8500      27.8        55       112        60
OIR    2025130    131400   -9.7100 -136.8600      27.8        55       108        60
OIR    2025130    131400   -9.7100 -136.8700      27.9        54       104        60
OIR    2025130    131400   -9.7100 -136.8800      28.0        54       104        60
OIR    2025130    131400   -9.7100 -136.8900      28.1        53       103        60
OIR    2025130    131400   -9.7100 -136.9000      28.2        52       103        60
OIR    2025130    131400   -9.7100 -136.9100      28.3        51       103        60
OIR    2025130    131400   -9.7100 -136.9200      28.5        51       103        60
OIR    2025130    131400   -9.7100 -136.9300      28.6        50       103        60
OIR    2025130    131400   -9.7100 -136.9400      28.7        50       104        60
OIR    2025130    131400   -9.7100 -136.9500      28.8        50       104        60
OIR    2025130    131400   -9.7100 -136.9600      28.9        50       105        60
OIR    2025130    131400   -9.7100 -136.9700      29.0        49       107        60
OIR    2025130    131400   -9.7100 -136.9800      29.1        49       108        60
OIR    2025130    131400   -9.7100 -136.9900      29.2        49       108        60
OIR    2025130    131400   -9.7100 -137.0000      29.5        48       109        60
OIR    2025130    131400   -9.7100 -137.0100      29.8        48       110        60
OIR    2025130    131400   -9.7100 -137.0200      30.1        47       110        60
OIR    2025130    131400   -9.7100 -137.0300      30.4        47       109        60
OIR    2025130    131400   -9.7100 -137.0400      30.6        46       108        60
OIR    2025130    131400   -9.7100 -137.0500      30.8        46       107        60
OIR    2025130    131400   -9.7100 -137.0600      31.0        46       107        60
OIR    2025130    131400   -9.7100 -137.0700      31.2        47       107        60
OIR    2025130    131400   -9.7100 -137.0800      31.3        47       105        60
OIR    2025130    131400   -9.7100 -137.0900      31.5        47       104        60
OIR    2025130    131400   -9.7100 -137.1000      31.7        47       104        60
OIR    2025130    131400   -9.7100 -137.1100      31.9        47       103        60
OIR    2025130    131400   -9.7100 -137.1200      32.1        48       103        60
OIR    2025130    131400   -9.7100 -137.1300      32.4        48       103        60
OIR    2025130    131400   -9.7100 -137.1400      32.7        49       103        60
OIR    2025130    131400   -9.7100 -137.1500      33.0        50       103        60
OIR    2025130    131400   -9.7100 -137.1600      33.4        50       104        60
OIR    2025130    131400   -9.7100 -137.1700      33.7        51       103        60
OIR    2025130    131400   -9.7100 -137.1800      33.8        51       103        60
OIR    2025130    131400   -9.7100 -137.1900      33.8        51       105        60
OIR    2025130    131400   -9.7100 -137.2000      33.9        51       107        60
OIR    2025130    131400   -9.7100 -137.2100      33.9        51       107        60
OIR    2025130    131400   -9.7100 -137.2200      34.0        51       105        60
OIR    2025130    131400   -9.7100 -137.2300      34.0        51       104        60
OIR    2025130    131400   -9.7100 -137.2400      34.0        51       103        60
OIR    2025130    131400   -9.7100 -137.2500      34.1        51       103        60
OIR    2025130    131400   -9.7100 -137.2600      34.1        52       103        60
OIR    2025130    131400   -9.7100 -137.2700      34.1        52       103        60
OIR    2025130    131400   -9.7100 -137.2800      34.1        52       103        60
OIR    2025130    131400   -9.7100 -137.2900      34.1        52       103        60
OIR    2025130    131400   -9.7100 -137.3000      34.0        52       103        60
OIR    2025130    131400   -9.7100 -137.3100      33.9        52       103        60
OIR    2025130    131400   -9.7100 -137.3200      33.5        53       103        60
OIR    2025130    131400   -9.7100 -137.3300      32.8        54       103        60
OIR    2025130    131400   -9.7100 -137.3400      31.4        55       103        60
OIR    2025130    131400   -9.7100 -137.3500      30.2        57       103        60
OIR    2025130    131400   -9.7100 -137.3600      29.6        58       103        60
OIR    2025130    131400   -9.7100 -137.3700      29.4        58       103        60
OIR    2025130    131400   -9.7100 -137.3800      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.3900      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4000      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4100      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4200      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4300      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.7100 -137.4900      29.2        59       103        60
OIR    2025130    131400   -9.7100 -137.5000      28.4        62       103        60
OIR    2025130    131400   -9.7100 -137.5100      26.0        70       103        60
OIR    2025130    131400   -9.7100 -137.5200      23.4        78       103        60
OIR    2025130    131400   -9.7100 -137.5300      22.3        81       103        60
OIR    2025130    131400   -9.7100 -137.5400      21.0        85       103        60
OIR    2025130    131400   -9.7100 -137.5500      18.1        97       103        60
OIR    2025130    131400   -9.7100 -137.5600      17.6       118       103        60
OIR    2025130    131400   -9.7100 -137.5700      17.4       122       103        60
OIR    2025130    131400   -9.7100 -137.5800      16.2       118       103        60
OIR    2025130    131400   -9.7100 -137.5900      14.7       114       103        60
OIR    2025130    131400   -9.7100 -137.6000      13.7       105       103        60
OIR    2025130    131400   -9.7100 -137.6100      13.4        94       103        60
OIR    2025130    131400   -9.7100 -137.6200      13.6        83       103        60
OIR    2025130    131400   -9.7100 -137.6300      15.4        64       103        60
OIR    2025130    131400   -9.7100 -137.6400      20.8        43       103        60
OIR    2025130    131400   -9.7100 -137.6500      25.3        29       103        60
OIR    2025130    131400   -9.7100 -137.6600      28.1        19       104        60
OIR    2025130    131400   -9.7100 -137.6700      29.8        15       104        60
OIR    2025130    131400   -9.7100 -137.6800      30.8        13       104        60
OIR    2025130    131400   -9.7100 -137.6900      30.9        11       103        60
OIR    2025130    131400   -9.7100 -137.7000      30.6        10       103        60
OIR    2025130    131400   -9.7100 -137.7100      30.5         8       103        60
OIR    2025130    131400   -9.7100 -137.7200      30.4         7       103        60
OIR    2025130    131400   -9.7100 -137.7300      30.4         5       103        60
OIR    2025130    131400   -9.7100 -137.7400      30.6         4       103        60
OIR    2025130    131400   -9.7100 -137.7500      31.1         3       103        60
OIR    2025130    131400   -9.7100 -137.7600      31.7         0       103        60
OIR    2025130    131400   -9.7100 -137.7700      32.0       359       103        60
OIR    2025130    131400   -9.7100 -137.7800      32.1       358       103        60
OIR    2025130    131400   -9.7100 -137.7900      32.2       357       103        60
OIR    2025130    131400   -9.7100 -137.8000      32.2       357       103        60
OIR    2025130    131400   -9.7100 -137.8100      32.2       356       103        60
OIR    2025130    131400   -9.7100 -137.8200      32.2       356       103        60
OIR    2025130    131400   -9.7100 -137.8300      32.3       356       103        60
OIR    2025130    131400   -9.7100 -137.8400      32.4       355       103        60
OIR    2025130    131400   -9.7100 -137.8500      32.6       355       103        60
OIR    2025130    131400   -9.7100 -137.8600      32.7       354       103        60
OIR    2025130    131400   -9.7100 -137.8700      32.7       354       103        60
OIR    2025130    131400   -9.7100 -137.8800      32.8       354       103        60
OIR    2025130    131400   -9.7100 -137.8900      32.8       353       103        60
OIR    2025130    131400   -9.7100 -137.9000      32.8       353       104        60
OIR    2025130    131400   -9.7100 -137.9100      32.8       353       104        60
OIR    2025130    131400   -9.7100 -137.9200      32.8       353       104        60
OIR    2025130    131400   -9.7100 -137.9300      32.7       353       103        60
OIR    2025130    131400   -9.7100 -137.9400      32.5       352       104        60
OIR    2025130    131400   -9.7100 -137.9500      32.0       351       104        60
OIR    2025130    131400   -9.7100 -137.9600      31.3       350       111        60
OIR    2025130    131400   -9.7100 -137.9700      30.6       349       115        60
OIR    2025130    131400   -9.7100 -137.9800      29.9       347       116        60
OIR    2025130    131400   -9.7100 -137.9900      28.9       345       116        60
OIR    2025130    131400   -9.7100 -138.0000      27.9       344       116        60
OIR    2025130    131400   -9.7100 -138.0100      26.8       343       116        60
OIR    2025130    131400   -9.7100 -138.0200      25.9       341       117        60
OIR    2025130    131400   -9.7100 -138.0300      25.1       340       116        60
OIR    2025130    131400   -9.7100 -138.0400      24.7       339       116        60
OIR    2025130    131400   -9.7100 -138.0500      24.4       339       116        60
OIR    2025130    131400   -9.7100 -138.0600      24.3       339       117        60
OIR    2025130    131400   -9.7100 -138.0700      24.9       335       122        60
OIR    2025130    131400   -9.7100 -138.0800      24.9       334       126        60
OIR    2025130    131400   -9.7100 -138.0900      25.1       330       130        60
OIR    2025130    131400   -9.7100 -138.1000      25.5       328       134        60
OIR    2025130    131400   -9.7100 -138.1100      25.9       327       138        60
OIR    2025130    131400   -9.7100 -138.1200      26.6       326       142        60
OIR    2025130    131400   -9.7100 -138.1300      26.9       326       146        60
OIR    2025130    131400   -9.7100 -138.1400      26.8       325       144        60
OIR    2025130    131400   -9.7100 -138.1500      26.7       325       142        60
OIR    2025130    131400   -9.7100 -138.1600      26.5       325       143        60
OIR    2025130    131400   -9.7100 -138.1700      26.5       325       144        60
OIR    2025130    131400   -9.7100 -138.1800      26.4       325       143        60
OIR    2025130    131400   -9.7100 -138.1900      26.3       325       141        60
OIR    2025130    131400   -9.7100 -138.2000      26.2       326       137        60
OIR    2025130    131400   -9.7100 -138.2100      25.9       326       135        60
OIR    2025130    131400   -9.7100 -138.2200      25.7       326       135        60
OIR    2025130    131400   -9.7100 -138.2300      25.3       327       136        60
OIR    2025130    131400   -9.7100 -138.2400      25.0       327       136        60
OIR    2025130    131400   -9.7100 -138.2500      24.7       327       135        60
OIR    2025130    131400   -9.7100 -138.2600      24.6       327       134        60
OIR    2025130    131400   -9.7100 -138.2700      24.4       328       134        60
OIR    2025130    131400   -9.7100 -138.2800      24.3       328       133        60
OIR    2025130    131400   -9.7100 -138.2900      24.2       328       132        60
OIR    2025130    131400   -9.7100 -138.3000      24.1       328       131        60
OIR    2025130    131400   -9.7100 -138.3100      24.1       329       130        60
OIR    2025130    131400   -9.7100 -138.3200      24.0       329       129        60
OIR    2025130    131400   -9.7100 -138.3300      23.9       329       130        60
OIR    2025130    131400   -9.7100 -138.3400      23.8       329       130        60
OIR    2025130    131400   -9.7100 -138.3500      23.7       329       131        60
OIR    2025130    131400   -9.7100 -138.3600      23.4       329       133        60
OIR    2025130    131400   -9.7100 -138.3700      23.1       330       135        60
OIR    2025130    131400   -9.7100 -138.3800      22.7       330       137        60
OIR    2025130    131400   -9.7100 -138.3900      22.1       331       138        60
OIR    2025130    131400   -9.7100 -138.4000      21.3       332       140        60
OIR    2025130    131400   -9.7100 -138.4100      20.8       333       141        60
OIR    2025130    131400   -9.7100 -138.4200      20.7       334       142        60
OIR    2025130    131400   -9.7100 -138.4300      20.6       334       145        60
OIR    2025130    131400   -9.7200 -136.0600      43.0        77       146        60
OIR    2025130    131400   -9.7200 -136.0700      43.0        77       146        60
OIR    2025130    131400   -9.7200 -136.0800      43.0        77       147        60
OIR    2025130    131400   -9.7200 -136.1300      43.0        77       147        60
OIR    2025130    131400   -9.7200 -136.1400      43.6        77       145        60
OIR    2025130    131400   -9.7200 -136.1500      43.8        77       145        60
OIR    2025130    131400   -9.7200 -136.1600      43.9        77       146        60
OIR    2025130    131400   -9.7200 -136.1700      44.0        77       146        60
OIR    2025130    131400   -9.7200 -136.1800      43.9        77       137        60
OIR    2025130    131400   -9.7200 -136.1900      43.9        77       129        60
OIR    2025130    131400   -9.7200 -136.2000      43.9        77       126        60
OIR    2025130    131400   -9.7200 -136.2100      43.7        77       126        60
OIR    2025130    131400   -9.7200 -136.2200      43.6        78       129        60
OIR    2025130    131400   -9.7200 -136.2300      42.9        78       127        60
OIR    2025130    131400   -9.7200 -136.2400      42.9        78       122        60
OIR    2025130    131400   -9.7200 -136.2500      42.8        78       121        60
OIR    2025130    131400   -9.7200 -136.2600      42.8        78       125        60
OIR    2025130    131400   -9.7200 -136.2700      42.8        78       127        60
OIR    2025130    131400   -9.7200 -136.2800      42.6        78       128        60
OIR    2025130    131400   -9.7200 -136.2900      42.4        78       129        60
OIR    2025130    131400   -9.7200 -136.3000      42.0        78       130        60
OIR    2025130    131400   -9.7200 -136.3100      40.6        77       132        60
OIR    2025130    131400   -9.7200 -136.3200      39.9        76       135        60
OIR    2025130    131400   -9.7200 -136.3300      39.5        75       136        60
OIR    2025130    131400   -9.7200 -136.3400      39.5        75       135        60
OIR    2025130    131400   -9.7200 -136.3500      39.5        75       133        60
OIR    2025130    131400   -9.7200 -136.3600      39.6        75       131        60
OIR    2025130    131400   -9.7200 -136.3700      39.8        74       129        60
OIR    2025130    131400   -9.7200 -136.3800      39.9        74       130        60
OIR    2025130    131400   -9.7200 -136.3900      39.9        74       132        60
OIR    2025130    131400   -9.7200 -136.4000      40.0        74       135        60
OIR    2025130    131400   -9.7200 -136.4100      40.1        74       138        60
OIR    2025130    131400   -9.7200 -136.4200      40.2        73       139        60
OIR    2025130    131400   -9.7200 -136.4300      39.1        72       138        60
OIR    2025130    131400   -9.7200 -136.4400      39.1        72       132        60
OIR    2025130    131400   -9.7200 -136.4500      38.9        72       129        60
OIR    2025130    131400   -9.7200 -136.4600      38.7        72       127        60
OIR    2025130    131400   -9.7200 -136.4700      37.7        73       125        60
OIR    2025130    131400   -9.7200 -136.4800      36.6        73       125        60
OIR    2025130    131400   -9.7200 -136.4900      36.1        73       124        60
OIR    2025130    131400   -9.7200 -136.5000      35.6        73       124        60
OIR    2025130    131400   -9.7200 -136.5100      35.2        72       123        60
OIR    2025130    131400   -9.7200 -136.5200      34.6        71       123        60
OIR    2025130    131400   -9.7200 -136.5300      33.5        70       126        60
OIR    2025130    131400   -9.7200 -136.5400      33.4        69       128        60
OIR    2025130    131400   -9.7200 -136.5500      33.6        69       130        60
OIR    2025130    131400   -9.7200 -136.5600      33.9        70       129        60
OIR    2025130    131400   -9.7200 -136.5700      34.1        70       127        60
OIR    2025130    131400   -9.7200 -136.5800      34.2        71       126        60
OIR    2025130    131400   -9.7200 -136.5900      34.1        72       124        60
OIR    2025130    131400   -9.7200 -136.6000      34.3        72       123        60
OIR    2025130    131400   -9.7200 -136.6100      34.4        72       123        60
OIR    2025130    131400   -9.7200 -136.6200      34.4        72       124        60
OIR    2025130    131400   -9.7200 -136.6300      34.3        72       125        60
OIR    2025130    131400   -9.7200 -136.6400      33.8        73       124        60
OIR    2025130    131400   -9.7200 -136.6500      33.6        72       125        60
OIR    2025130    131400   -9.7200 -136.6600      33.6        72       127        60
OIR    2025130    131400   -9.7200 -136.6700      33.5        71       129        60
OIR    2025130    131400   -9.7200 -136.6800      33.4        71       132        60
OIR    2025130    131400   -9.7200 -136.6900      33.0        71       135        60
OIR    2025130    131400   -9.7200 -136.7000      32.4        70       136        60
OIR    2025130    131400   -9.7200 -136.7100      32.0        70       136        60
OIR    2025130    131400   -9.7200 -136.7200      31.7        70       134        60
OIR    2025130    131400   -9.7200 -136.7300      30.8        69       133        60
OIR    2025130    131400   -9.7200 -136.7400      27.6        67       132        60
OIR    2025130    131400   -9.7200 -136.7500      25.4        64       129        60
OIR    2025130    131400   -9.7200 -136.7600      24.2        62       126        60
OIR    2025130    131400   -9.7200 -136.7700      24.6        61       124        60
OIR    2025130    131400   -9.7200 -136.7800      25.7        59       122        60
OIR    2025130    131400   -9.7200 -136.7900      26.5        58       122        60
OIR    2025130    131400   -9.7200 -136.8000      27.0        57       121        60
OIR    2025130    131400   -9.7200 -136.8100      27.3        56       121        60
OIR    2025130    131400   -9.7200 -136.8200      27.6        56       117        60
OIR    2025130    131400   -9.7200 -136.8300      27.7        55       115        60
OIR    2025130    131400   -9.7200 -136.8400      27.8        55       113        60
OIR    2025130    131400   -9.7200 -136.8500      27.9        54       110        60
OIR    2025130    131400   -9.7200 -136.8600      28.0        54       107        60
OIR    2025130    131400   -9.7200 -136.8700      28.0        54       104        60
OIR    2025130    131400   -9.7200 -136.8800      28.1        53       104        60
OIR    2025130    131400   -9.7200 -136.8900      28.2        53       103        60
OIR    2025130    131400   -9.7200 -136.9000      28.3        52       103        60
OIR    2025130    131400   -9.7200 -136.9100      28.5        51       103        60
OIR    2025130    131400   -9.7200 -136.9200      28.6        51       103        60
OIR    2025130    131400   -9.7200 -136.9300      28.7        50       104        60
OIR    2025130    131400   -9.7200 -136.9400      28.8        50       104        60
OIR    2025130    131400   -9.7200 -136.9500      28.8        50       104        60
OIR    2025130    131400   -9.7200 -136.9600      28.9        50       104        60
OIR    2025130    131400   -9.7200 -136.9700      29.0        49       104        60
OIR    2025130    131400   -9.7200 -136.9800      29.1        49       105        60
OIR    2025130    131400   -9.7200 -136.9900      29.2        48       107        60
OIR    2025130    131400   -9.7200 -137.0000      29.5        48       108        60
OIR    2025130    131400   -9.7200 -137.0100      29.8        47       109        60
OIR    2025130    131400   -9.7200 -137.0200      30.2        46       110        60
OIR    2025130    131400   -9.7200 -137.0300      30.4        46       111        60
OIR    2025130    131400   -9.7200 -137.0400      30.6        46       110        60
OIR    2025130    131400   -9.7200 -137.0500      30.8        46       109        60
OIR    2025130    131400   -9.7200 -137.0600      31.0        46       108        60
OIR    2025130    131400   -9.7200 -137.0700      31.1        46       107        60
OIR    2025130    131400   -9.7200 -137.0800      31.3        46       105        60
OIR    2025130    131400   -9.7200 -137.0900      31.5        46       105        60
OIR    2025130    131400   -9.7200 -137.1000      31.7        46       104        60
OIR    2025130    131400   -9.7200 -137.1100      31.8        47       104        60
OIR    2025130    131400   -9.7200 -137.1200      32.0        47       104        60
OIR    2025130    131400   -9.7200 -137.1300      32.2        47       104        60
OIR    2025130    131400   -9.7200 -137.1400      32.4        48       104        60
OIR    2025130    131400   -9.7200 -137.1500      32.8        48       104        60
OIR    2025130    131400   -9.7200 -137.1600      33.2        49       104        60
OIR    2025130    131400   -9.7200 -137.1700      33.6        50       103        60
OIR    2025130    131400   -9.7200 -137.1800      33.8        51       103        60
OIR    2025130    131400   -9.7200 -137.1900      33.8        51       105        60
OIR    2025130    131400   -9.7200 -137.2000      33.9        51       107        60
OIR    2025130    131400   -9.7200 -137.2100      34.0        51       107        60
OIR    2025130    131400   -9.7200 -137.2200      34.0        51       105        60
OIR    2025130    131400   -9.7200 -137.2300      34.1        51       104        60
OIR    2025130    131400   -9.7200 -137.2400      34.2        51       103        60
OIR    2025130    131400   -9.7200 -137.2500      34.3        51       103        60
OIR    2025130    131400   -9.7200 -137.2600      34.4        51       103        60
OIR    2025130    131400   -9.7200 -137.2700      34.5        51       103        60
OIR    2025130    131400   -9.7200 -137.2800      34.6        51       103        60
OIR    2025130    131400   -9.7200 -137.2900      34.6        51       103        60
OIR    2025130    131400   -9.7200 -137.3000      34.6        51       103        60
OIR    2025130    131400   -9.7200 -137.3100      34.5        52       103        60
OIR    2025130    131400   -9.7200 -137.3200      34.3        52       103        60
OIR    2025130    131400   -9.7200 -137.3300      33.8        53       103        60
OIR    2025130    131400   -9.7200 -137.3400      33.0        53       103        60
OIR    2025130    131400   -9.7200 -137.3500      31.8        55       103        60
OIR    2025130    131400   -9.7200 -137.3600      30.6        57       103        60
OIR    2025130    131400   -9.7200 -137.3700      29.9        58       103        60
OIR    2025130    131400   -9.7200 -137.3800      29.6        58       103        60
OIR    2025130    131400   -9.7200 -137.3900      29.5        58       103        60
OIR    2025130    131400   -9.7200 -137.4000      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4100      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4200      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4300      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.7200 -137.4900      29.3        59       103        60
OIR    2025130    131400   -9.7200 -137.5000      28.7        60       103        60
OIR    2025130    131400   -9.7200 -137.5100      27.4        64       103        60
OIR    2025130    131400   -9.7200 -137.5200      25.3        69       103        60
OIR    2025130    131400   -9.7200 -137.5300      23.4        73       103        60
OIR    2025130    131400   -9.7200 -137.5400      22.2        74       103        60
OIR    2025130    131400   -9.7200 -137.5500      20.4        78       103        60
OIR    2025130    131400   -9.7200 -137.5600      18.1        88       103        60
OIR    2025130    131400   -9.7200 -137.5700      16.1       101       103        60
OIR    2025130    131400   -9.7200 -137.5800      14.7       106       103        60
OIR    2025130    131400   -9.7200 -137.5900      13.6       102       103        60
OIR    2025130    131400   -9.7200 -137.6000      13.1        95       103        60
OIR    2025130    131400   -9.7200 -137.6100      13.2        88       103        60
OIR    2025130    131400   -9.7200 -137.6200      13.8        81       103        60
OIR    2025130    131400   -9.7200 -137.6300      15.6        68       103        60
OIR    2025130    131400   -9.7200 -137.6400      21.1        44       103        60
OIR    2025130    131400   -9.7200 -137.6500      28.1        25       104        60
OIR    2025130    131400   -9.7200 -137.6600      31.0        17       104        60
OIR    2025130    131400   -9.7200 -137.6700      32.5        14       105        60
OIR    2025130    131400   -9.7200 -137.6800      32.9        12       104        60
OIR    2025130    131400   -9.7200 -137.6900      32.6        11       103        60
OIR    2025130    131400   -9.7200 -137.7000      32.0         9       103        60
OIR    2025130    131400   -9.7200 -137.7100      31.7         8       103        60
OIR    2025130    131400   -9.7200 -137.7200      31.5         7       103        60
OIR    2025130    131400   -9.7200 -137.7300      31.3         6       103        60
OIR    2025130    131400   -9.7200 -137.7400      31.5         5       103        60
OIR    2025130    131400   -9.7200 -137.7500      32.0         3       103        60
OIR    2025130    131400   -9.7200 -137.7600      32.4         0       103        60
OIR    2025130    131400   -9.7200 -137.7700      32.6       359       103        60
OIR    2025130    131400   -9.7200 -137.7800      32.6       358       103        60
OIR    2025130    131400   -9.7200 -137.7900      32.6       357       103        60
OIR    2025130    131400   -9.7200 -137.8000      32.5       357       103        60
OIR    2025130    131400   -9.7200 -137.8100      32.5       356       103        60
OIR    2025130    131400   -9.7200 -137.8200      32.6       356       103        60
OIR    2025130    131400   -9.7200 -137.8300      32.7       355       103        60
OIR    2025130    131400   -9.7200 -137.8400      32.8       355       103        60
OIR    2025130    131400   -9.7200 -137.8500      32.8       355       103        60
OIR    2025130    131400   -9.7200 -137.8600      32.8       354       103        60
OIR    2025130    131400   -9.7200 -137.8700      32.9       354       103        60
OIR    2025130    131400   -9.7200 -137.8800      32.9       353       103        60
OIR    2025130    131400   -9.7200 -137.8900      32.9       353       103        60
OIR    2025130    131400   -9.7200 -137.9000      32.9       353       103        60
OIR    2025130    131400   -9.7200 -137.9100      32.9       353       104        60
OIR    2025130    131400   -9.7200 -137.9200      32.9       353       104        60
OIR    2025130    131400   -9.7200 -137.9300      32.8       353       103        60
OIR    2025130    131400   -9.7200 -137.9400      32.6       352       103        60
OIR    2025130    131400   -9.7200 -137.9500      32.1       352       104        60
OIR    2025130    131400   -9.7200 -137.9600      31.6       351       108        60
OIR    2025130    131400   -9.7200 -137.9700      30.9       350       111        60
OIR    2025130    131400   -9.7200 -137.9800      30.4       349       112        60
OIR    2025130    131400   -9.7200 -137.9900      29.7       348       113        60
OIR    2025130    131400   -9.7200 -138.0000      28.8       347       113        60
OIR    2025130    131400   -9.7200 -138.0100      27.9       346       114        60
OIR    2025130    131400   -9.7200 -138.0200      26.9       344       116        60
OIR    2025130    131400   -9.7200 -138.0300      25.9       343       115        60
OIR    2025130    131400   -9.7200 -138.0400      25.1       342       115        60
OIR    2025130    131400   -9.7200 -138.0500      24.6       342       116        60
OIR    2025130    131400   -9.7200 -138.0600      24.3       342       116        60
OIR    2025130    131400   -9.7200 -138.0700      24.7       339       121        60
OIR    2025130    131400   -9.7200 -138.0800      24.8       337       125        60
OIR    2025130    131400   -9.7200 -138.0900      25.3       333       129        60
OIR    2025130    131400   -9.7200 -138.1000      26.3       329       134        60
OIR    2025130    131400   -9.7200 -138.1100      27.0       328       138        60
OIR    2025130    131400   -9.7200 -138.1200      27.4       327       144        60
OIR    2025130    131400   -9.7200 -138.1400      27.6       326       146        60
OIR    2025130    131400   -9.7200 -138.1500      27.5       326       142        60
OIR    2025130    131400   -9.7200 -138.1600      27.4       326       143        60
OIR    2025130    131400   -9.7200 -138.1700      27.4       326       144        60
OIR    2025130    131400   -9.7200 -138.1800      27.4       326       143        60
OIR    2025130    131400   -9.7200 -138.1900      27.4       326       141        60
OIR    2025130    131400   -9.7200 -138.2000      27.2       326       138        60
OIR    2025130    131400   -9.7200 -138.2100      26.8       326       135        60
OIR    2025130    131400   -9.7200 -138.2200      26.3       327       134        60
OIR    2025130    131400   -9.7200 -138.2300      25.8       327       133        60
OIR    2025130    131400   -9.7200 -138.2400      25.3       327       132        60
OIR    2025130    131400   -9.7200 -138.2500      25.0       328       132        60
OIR    2025130    131400   -9.7200 -138.2600      24.8       328       133        60
OIR    2025130    131400   -9.7200 -138.2700      24.6       328       133        60
OIR    2025130    131400   -9.7200 -138.2800      24.4       328       133        60
OIR    2025130    131400   -9.7200 -138.2900      24.3       328       131        60
OIR    2025130    131400   -9.7200 -138.3000      24.2       328       130        60
OIR    2025130    131400   -9.7200 -138.3100      24.2       329       129        60
OIR    2025130    131400   -9.7200 -138.3200      24.1       329       128        60
OIR    2025130    131400   -9.7200 -138.3300      24.0       329       129        60
OIR    2025130    131400   -9.7200 -138.3400      23.9       329       130        60
OIR    2025130    131400   -9.7200 -138.3500      23.8       329       132        60
OIR    2025130    131400   -9.7200 -138.3600      23.6       329       134        60
OIR    2025130    131400   -9.7200 -138.3700      23.3       330       136        60
OIR    2025130    131400   -9.7200 -138.3800      22.7       330       137        60
OIR    2025130    131400   -9.7200 -138.3900      22.0       331       138        60
OIR    2025130    131400   -9.7200 -138.4000      21.3       332       140        60
OIR    2025130    131400   -9.7200 -138.4100      20.9       333       142        60
OIR    2025130    131400   -9.7200 -138.4200      20.7       334       143        60
OIR    2025130    131400   -9.7200 -138.4300      20.6       334       146        60
OIR    2025130    131400   -9.7300 -136.0800      42.9        77       147        60
OIR    2025130    131400   -9.7300 -136.1300      43.1        77       147        60
OIR    2025130    131400   -9.7300 -136.1400      43.4        77       144        60
OIR    2025130    131400   -9.7300 -136.1500      43.7        77       142        60
OIR    2025130    131400   -9.7300 -136.1600      43.9        77       145        60
OIR    2025130    131400   -9.7300 -136.1700      43.9        77       147        60
OIR    2025130    131400   -9.7300 -136.1800      43.9        77       140        60
OIR    2025130    131400   -9.7300 -136.1900      43.8        77       133        60
OIR    2025130    131400   -9.7300 -136.2000      43.8        77       130        60
OIR    2025130    131400   -9.7300 -136.2100      43.7        77       128        60
OIR    2025130    131400   -9.7300 -136.2200      43.6        78       130        60
OIR    2025130    131400   -9.7300 -136.2300      42.9        78       127        60
OIR    2025130    131400   -9.7300 -136.2400      42.9        78       122        60
OIR    2025130    131400   -9.7300 -136.2500      42.8        78       121        60
OIR    2025130    131400   -9.7300 -136.2600      42.9        78       124        60
OIR    2025130    131400   -9.7300 -136.2700      42.8        78       127        60
OIR    2025130    131400   -9.7300 -136.2800      42.7        78       128        60
OIR    2025130    131400   -9.7300 -136.2900      42.5        79       130        60
OIR    2025130    131400   -9.7300 -136.3000      42.2        79       131        60
OIR    2025130    131400   -9.7300 -136.3100      41.1        78       135        60
OIR    2025130    131400   -9.7300 -136.3200      39.9        77       138        60
OIR    2025130    131400   -9.7300 -136.3300      39.4        76       137        60
OIR    2025130    131400   -9.7300 -136.3400      39.3        75       135        60
OIR    2025130    131400   -9.7300 -136.3500      39.3        75       134        60
OIR    2025130    131400   -9.7300 -136.3600      39.4        74       132        60
OIR    2025130    131400   -9.7300 -136.3700      39.7        74       130        60
OIR    2025130    131400   -9.7300 -136.3800      39.9        74       131        60
OIR    2025130    131400   -9.7300 -136.3900      39.9        74       132        60
OIR    2025130    131400   -9.7300 -136.4000      40.0        74       136        60
OIR    2025130    131400   -9.7300 -136.4100      40.1        73       140        60
OIR    2025130    131400   -9.7300 -136.4200      40.1        73       141        60
OIR    2025130    131400   -9.7300 -136.4300      39.2        72       141        60
OIR    2025130    131400   -9.7300 -136.4400      39.1        72       136        60
OIR    2025130    131400   -9.7300 -136.4500      38.8        73       132        60
OIR    2025130    131400   -9.7300 -136.4600      37.8        73       129        60
OIR    2025130    131400   -9.7300 -136.4700      36.2        75       127        60
OIR    2025130    131400   -9.7300 -136.4800      35.6        75       127        60
OIR    2025130    131400   -9.7300 -136.4900      35.2        74       126        60
OIR    2025130    131400   -9.7300 -136.5000      34.6        73       125        60
OIR    2025130    131400   -9.7300 -136.5100      34.4        72       123        60
OIR    2025130    131400   -9.7300 -136.5200      33.5        70       122        60
OIR    2025130    131400   -9.7300 -136.5300      32.4        68       125        60
OIR    2025130    131400   -9.7300 -136.5400      32.6        68       128        60
OIR    2025130    131400   -9.7300 -136.5500      32.7        69       132        60
OIR    2025130    131400   -9.7300 -136.5600      33.2        70       132        60
OIR    2025130    131400   -9.7300 -136.5700      33.5        71       130        60
OIR    2025130    131400   -9.7300 -136.5800      33.9        75       128        60
OIR    2025130    131400   -9.7300 -136.5900      34.4        80       126        60
OIR    2025130    131400   -9.7300 -136.6000      35.1        82       125        60
OIR    2025130    131400   -9.7300 -136.6100      35.6        83       125        60
OIR    2025130    131400   -9.7300 -136.6200      35.1        82       127        60
OIR    2025130    131400   -9.7300 -136.6300      33.5        80       129        60
OIR    2025130    131400   -9.7300 -136.6400      32.7        79       127        60
OIR    2025130    131400   -9.7300 -136.6500      32.4        76       125        60
OIR    2025130    131400   -9.7300 -136.6600      32.4        74       125        60
OIR    2025130    131400   -9.7300 -136.6700      32.5        72       128        60
OIR    2025130    131400   -9.7300 -136.6800      32.4        72       132        60
OIR    2025130    131400   -9.7300 -136.6900      32.1        71       135        60
OIR    2025130    131400   -9.7300 -136.7000      31.9        71       137        60
OIR    2025130    131400   -9.7300 -136.7100      31.8        70       137        60
OIR    2025130    131400   -9.7300 -136.7200      31.6        70       137        60
OIR    2025130    131400   -9.7300 -136.7300      30.9        70       135        60
OIR    2025130    131400   -9.7300 -136.7400      24.5        67       134        60
OIR    2025130    131400   -9.7300 -136.7500      21.6        62       131        60
OIR    2025130    131400   -9.7300 -136.7600      20.6        60       128        60
OIR    2025130    131400   -9.7300 -136.7700      21.8        59       124        60
OIR    2025130    131400   -9.7300 -136.7800      24.5        58       122        60
OIR    2025130    131400   -9.7300 -136.7900      26.2        56       121        60
OIR    2025130    131400   -9.7300 -136.8000      26.9        56       121        60
OIR    2025130    131400   -9.7300 -136.8100      27.3        55       121        60
OIR    2025130    131400   -9.7300 -136.8200      27.7        55       117        60
OIR    2025130    131400   -9.7300 -136.8300      27.9        55       114        60
OIR    2025130    131400   -9.7300 -136.8400      28.0        54       111        60
OIR    2025130    131400   -9.7300 -136.8500      28.0        54       109        60
OIR    2025130    131400   -9.7300 -136.8600      28.0        54       107        60
OIR    2025130    131400   -9.7300 -136.8700      28.1        53       104        60
OIR    2025130    131400   -9.7300 -136.8800      28.2        53       104        60
OIR    2025130    131400   -9.7300 -136.8900      28.3        52       103        60
OIR    2025130    131400   -9.7300 -136.9000      28.5        51       103        60
OIR    2025130    131400   -9.7300 -136.9100      28.6        51       103        60
OIR    2025130    131400   -9.7300 -136.9200      28.6        50       104        60
OIR    2025130    131400   -9.7300 -136.9300      28.7        50       104        60
OIR    2025130    131400   -9.7300 -136.9400      28.8        50       105        60
OIR    2025130    131400   -9.7300 -136.9500      28.8        50       105        60
OIR    2025130    131400   -9.7300 -136.9600      28.9        49       105        60
OIR    2025130    131400   -9.7300 -136.9700      29.0        49       104        60
OIR    2025130    131400   -9.7300 -136.9800      29.2        49       104        60
OIR    2025130    131400   -9.7300 -136.9900      29.3        48       105        60
OIR    2025130    131400   -9.7300 -137.0000      29.5        47       108        60
OIR    2025130    131400   -9.7300 -137.0100      29.9        46       109        60
OIR    2025130    131400   -9.7300 -137.0200      30.2        46       110        60
OIR    2025130    131400   -9.7300 -137.0300      30.4        46       111        60
OIR    2025130    131400   -9.7300 -137.0400      30.6        45       110        60
OIR    2025130    131400   -9.7300 -137.0500      30.7        45       109        60
OIR    2025130    131400   -9.7300 -137.0600      30.9        46       108        60
OIR    2025130    131400   -9.7300 -137.0700      31.1        46       107        60
OIR    2025130    131400   -9.7300 -137.0800      31.3        46       105        60
OIR    2025130    131400   -9.7300 -137.0900      31.5        46       104        60
OIR    2025130    131400   -9.7300 -137.1000      31.7        46       104        60
OIR    2025130    131400   -9.7300 -137.1100      31.8        46       104        60
OIR    2025130    131400   -9.7300 -137.1200      31.9        46       105        60
OIR    2025130    131400   -9.7300 -137.1300      32.1        47       105        60
OIR    2025130    131400   -9.7300 -137.1400      32.3        47       105        60
OIR    2025130    131400   -9.7300 -137.1500      32.5        48       104        60
OIR    2025130    131400   -9.7300 -137.1600      32.9        49       104        60
OIR    2025130    131400   -9.7300 -137.1700      33.4        50       103        60
OIR    2025130    131400   -9.7300 -137.1800      33.7        50       103        60
OIR    2025130    131400   -9.7300 -137.1900      33.8        50       104        60
OIR    2025130    131400   -9.7300 -137.2000      34.0        51       107        60
OIR    2025130    131400   -9.7300 -137.2100      34.0        51       107        60
OIR    2025130    131400   -9.7300 -137.2200      34.1        51       105        60
OIR    2025130    131400   -9.7300 -137.2300      34.2        51       104        60
OIR    2025130    131400   -9.7300 -137.2400      34.3        51       103        60
OIR    2025130    131400   -9.7300 -137.2500      34.4        51       103        60
OIR    2025130    131400   -9.7300 -137.2600      34.6        51       103        60
OIR    2025130    131400   -9.7300 -137.2700      34.7        51       103        60
OIR    2025130    131400   -9.7300 -137.2800      34.7        51       103        60
OIR    2025130    131400   -9.7300 -137.2900      34.8        51       103        60
OIR    2025130    131400   -9.7300 -137.3000      34.8        51       103        60
OIR    2025130    131400   -9.7300 -137.3100      34.7        51       103        60
OIR    2025130    131400   -9.7300 -137.3200      34.7        52       103        60
OIR    2025130    131400   -9.7300 -137.3300      34.5        52       103        60
OIR    2025130    131400   -9.7300 -137.3400      34.2        52       103        60
OIR    2025130    131400   -9.7300 -137.3500      33.6        53       103        60
OIR    2025130    131400   -9.7300 -137.3600      32.8        54       103        60
OIR    2025130    131400   -9.7300 -137.3700      31.4        55       103        60
OIR    2025130    131400   -9.7300 -137.3800      30.4        56       103        60
OIR    2025130    131400   -9.7300 -137.3900      29.8        57       103        60
OIR    2025130    131400   -9.7300 -137.4000      29.5        58       103        60
OIR    2025130    131400   -9.7300 -137.4100      29.4        58       103        60
OIR    2025130    131400   -9.7300 -137.4200      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4300      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4500      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4600      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4700      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4800      29.4        59       103        60
OIR    2025130    131400   -9.7300 -137.4900      29.3        59       103        60
OIR    2025130    131400   -9.7300 -137.5000      28.9        59       103        60
OIR    2025130    131400   -9.7300 -137.5100      28.1        60       103        60
OIR    2025130    131400   -9.7300 -137.5200      27.0        62       103        60
OIR    2025130    131400   -9.7300 -137.5300      25.2        64       103        60
OIR    2025130    131400   -9.7300 -137.5400      23.2        68       103        60
OIR    2025130    131400   -9.7300 -137.5500      21.6        70       103        60
OIR    2025130    131400   -9.7300 -137.5600      19.8        74       103        60
OIR    2025130    131400   -9.7300 -137.5700      17.3        78       103        60
OIR    2025130    131400   -9.7300 -137.5800      14.4        86       103        60
OIR    2025130    131400   -9.7300 -137.5900      13.3        90       103        60
OIR    2025130    131400   -9.7300 -137.6000      13.1        89       103        60
OIR    2025130    131400   -9.7300 -137.6100      13.2        86       103        60
OIR    2025130    131400   -9.7300 -137.6200      13.9        79       103        60
OIR    2025130    131400   -9.7300 -137.6300      16.3        63       103        60
OIR    2025130    131400   -9.7300 -137.6400      23.1        34       103        60
OIR    2025130    131400   -9.7300 -137.6500      31.6        18       104        60
OIR    2025130    131400   -9.7300 -137.6600      33.7        14       104        60
OIR    2025130    131400   -9.7300 -137.6700      34.4        12       105        60
OIR    2025130    131400   -9.7300 -137.6800      34.8        11       104        60
OIR    2025130    131400   -9.7300 -137.6900      34.5        11       103        60
OIR    2025130    131400   -9.7300 -137.7000      33.6        10       103        60
OIR    2025130    131400   -9.7300 -137.7100      32.8         8       103        60
OIR    2025130    131400   -9.7300 -137.7200      32.6         7       103        60
OIR    2025130    131400   -9.7300 -137.7300      32.5         6       103        60
OIR    2025130    131400   -9.7300 -137.7400      32.5         4       103        60
OIR    2025130    131400   -9.7300 -137.7500      32.7         3       103        60
OIR    2025130    131400   -9.7300 -137.7600      33.0         0       103        60
OIR    2025130    131400   -9.7300 -137.7700      33.1       359       103        60
OIR    2025130    131400   -9.7300 -137.7800      33.1       358       103        60
OIR    2025130    131400   -9.7300 -137.7900      33.0       357       103        60
OIR    2025130    131400   -9.7300 -137.8000      32.9       357       103        60
OIR    2025130    131400   -9.7300 -137.8100      32.9       356       103        60
OIR    2025130    131400   -9.7300 -137.8200      32.9       356       103        60
OIR    2025130    131400   -9.7300 -137.8300      32.9       355       103        60
OIR    2025130    131400   -9.7300 -137.8400      32.9       355       103        60
OIR    2025130    131400   -9.7300 -137.8500      32.9       354       103        60
OIR    2025130    131400   -9.7300 -137.8600      32.9       354       103        60
OIR    2025130    131400   -9.7300 -137.8700      32.9       354       103        60
OIR    2025130    131400   -9.7300 -137.8800      32.9       353       103        60
OIR    2025130    131400   -9.7300 -137.8900      32.9       353       103        60
OIR    2025130    131400   -9.7300 -137.9000      32.9       353       103        60
OIR    2025130    131400   -9.7300 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.7300 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7300 -137.9300      32.8       353       103        60
OIR    2025130    131400   -9.7300 -137.9400      32.7       353       103        60
OIR    2025130    131400   -9.7300 -137.9500      32.3       352       103        60
OIR    2025130    131400   -9.7300 -137.9600      31.9       352       105        60
OIR    2025130    131400   -9.7300 -137.9700      31.2       350       107        60
OIR    2025130    131400   -9.7300 -137.9800      30.7       350       109        60
OIR    2025130    131400   -9.7300 -137.9900      30.3       349       110        60
OIR    2025130    131400   -9.7300 -138.0000      29.8       349       110        60
OIR    2025130    131400   -9.7300 -138.0100      29.3       348       111        60
OIR    2025130    131400   -9.7300 -138.0200      28.4       347       114        60
OIR    2025130    131400   -9.7300 -138.0300      27.3       346       114        60
OIR    2025130    131400   -9.7300 -138.0400      26.3       345       115        60
OIR    2025130    131400   -9.7300 -138.0500      25.0       344       116        60
OIR    2025130    131400   -9.7300 -138.0600      24.5       344       117        60
OIR    2025130    131400   -9.7300 -138.0700      24.6       341       121        60
OIR    2025130    131400   -9.7300 -138.0800      24.7       340       125        60
OIR    2025130    131400   -9.7300 -138.0900      25.5       335       130        60
OIR    2025130    131400   -9.7300 -138.1000      27.1       330       134        60
OIR    2025130    131400   -9.7300 -138.1100      27.5       328       138        60
OIR    2025130    131400   -9.7300 -138.1200      27.8       327       144        60
OIR    2025130    131400   -9.7300 -138.1400      28.0       326       146        60
OIR    2025130    131400   -9.7300 -138.1500      27.9       326       142        60
OIR    2025130    131400   -9.7300 -138.1600      27.9       326       142        60
OIR    2025130    131400   -9.7300 -138.1700      27.9       326       143        60
OIR    2025130    131400   -9.7300 -138.1800      28.0       326       143        60
OIR    2025130    131400   -9.7300 -138.1900      27.9       326       141        60
OIR    2025130    131400   -9.7300 -138.2000      27.7       326       137        60
OIR    2025130    131400   -9.7300 -138.2100      27.3       327       134        60
OIR    2025130    131400   -9.7300 -138.2200      26.7       327       131        60
OIR    2025130    131400   -9.7300 -138.2300      26.2       327       130        60
OIR    2025130    131400   -9.7300 -138.2400      25.6       328       129        60
OIR    2025130    131400   -9.7300 -138.2500      25.2       328       130        60
OIR    2025130    131400   -9.7300 -138.2600      25.0       328       131        60
OIR    2025130    131400   -9.7300 -138.2700      24.8       328       132        60
OIR    2025130    131400   -9.7300 -138.2800      24.6       328       132        60
OIR    2025130    131400   -9.7300 -138.2900      24.4       328       131        60
OIR    2025130    131400   -9.7300 -138.3000      24.3       328       130        60
OIR    2025130    131400   -9.7300 -138.3100      24.3       329       128        60
OIR    2025130    131400   -9.7300 -138.3200      24.2       329       128        60
OIR    2025130    131400   -9.7300 -138.3300      24.1       329       130        60
OIR    2025130    131400   -9.7300 -138.3400      24.0       329       131        60
OIR    2025130    131400   -9.7300 -138.3500      23.9       329       133        60
OIR    2025130    131400   -9.7300 -138.3600      23.7       329       134        60
OIR    2025130    131400   -9.7300 -138.3700      23.4       329       136        60
OIR    2025130    131400   -9.7300 -138.3800      22.9       330       137        60
OIR    2025130    131400   -9.7300 -138.3900      22.2       331       139        60
OIR    2025130    131400   -9.7300 -138.4000      21.6       332       141        60
OIR    2025130    131400   -9.7300 -138.4100      21.1       333       143        60
OIR    2025130    131400   -9.7300 -138.4200      20.8       334       145        60
OIR    2025130    131400   -9.7300 -138.4300      20.7       334       148        60
OIR    2025130    131400   -9.7400 -136.0600      42.9        77       147        60
OIR    2025130    131400   -9.7400 -136.0700      42.9        77       146        60
OIR    2025130    131400   -9.7400 -136.0800      42.9        77       146        60
OIR    2025130    131400   -9.7400 -136.1300      43.1        77       145        60
OIR    2025130    131400   -9.7400 -136.1400      43.3        77       143        60
OIR    2025130    131400   -9.7400 -136.1500      43.5        77       142        60
OIR    2025130    131400   -9.7400 -136.1600      43.8        77       142        60
OIR    2025130    131400   -9.7400 -136.1700      43.8        77       142        60
OIR    2025130    131400   -9.7400 -136.1800      43.7        77       140        60
OIR    2025130    131400   -9.7400 -136.1900      43.7        77       137        60
OIR    2025130    131400   -9.7400 -136.2000      43.7        77       135        60
OIR    2025130    131400   -9.7400 -136.2100      43.6        77       134        60
OIR    2025130    131400   -9.7400 -136.2200      43.4        78       132        60
OIR    2025130    131400   -9.7400 -136.2300      43.0        78       128        60
OIR    2025130    131400   -9.7400 -136.2400      42.9        78       123        60
OIR    2025130    131400   -9.7400 -136.2500      42.9        78       121        60
OIR    2025130    131400   -9.7400 -136.2600      42.9        78       125        60
OIR    2025130    131400   -9.7400 -136.2700      42.9        78       127        60
OIR    2025130    131400   -9.7400 -136.2800      42.8        79       129        60
OIR    2025130    131400   -9.7400 -136.2900      42.6        79       131        60
OIR    2025130    131400   -9.7400 -136.3000      42.2        80       133        60
OIR    2025130    131400   -9.7400 -136.3100      41.1        79       142        60
OIR    2025130    131400   -9.7400 -136.3300      38.8        76       142        60
OIR    2025130    131400   -9.7400 -136.3400      38.6        75       138        60
OIR    2025130    131400   -9.7400 -136.3500      38.4        74       136        60
OIR    2025130    131400   -9.7400 -136.3600      38.6        73       134        60
OIR    2025130    131400   -9.7400 -136.3700      39.0        73       132        60
OIR    2025130    131400   -9.7400 -136.3800      39.6        73       132        60
OIR    2025130    131400   -9.7400 -136.3900      39.8        73       132        60
OIR    2025130    131400   -9.7400 -136.4000      39.6        73       135        60
OIR    2025130    131400   -9.7400 -136.4100      39.7        72       138        60
OIR    2025130    131400   -9.7400 -136.4200      39.6        71       141        60
OIR    2025130    131400   -9.7400 -136.4300      39.2        72       142        60
OIR    2025130    131400   -9.7400 -136.4400      39.0        72       139        60
OIR    2025130    131400   -9.7400 -136.4500      38.4        73       136        60
OIR    2025130    131400   -9.7400 -136.4600      36.8        74       133        60
OIR    2025130    131400   -9.7400 -136.4700      35.7        75       132        60
OIR    2025130    131400   -9.7400 -136.4800      35.4        75       131        60
OIR    2025130    131400   -9.7400 -136.4900      34.9        75       129        60
OIR    2025130    131400   -9.7400 -136.5000      33.8        73       126        60
OIR    2025130    131400   -9.7400 -136.5100      32.7        71       124        60
OIR    2025130    131400   -9.7400 -136.5200      31.8        68       122        60
OIR    2025130    131400   -9.7400 -136.5300      31.8        68       125        60
OIR    2025130    131400   -9.7400 -136.5400      32.1        68       128        60
OIR    2025130    131400   -9.7400 -136.5500      32.0        68       131        60
OIR    2025130    131400   -9.7400 -136.5600      32.4        69       131        60
OIR    2025130    131400   -9.7400 -136.5700      32.9        72       130        60
OIR    2025130    131400   -9.7400 -136.5800      34.1        78       128        60
OIR    2025130    131400   -9.7400 -136.5900      35.4        82       128        60
OIR    2025130    131400   -9.7400 -136.6000      35.6        83       130        60
OIR    2025130    131400   -9.7400 -136.6100      35.7        83       132        60
OIR    2025130    131400   -9.7400 -136.6200      35.5        83       136        60
OIR    2025130    131400   -9.7400 -136.6300      34.1        82       140        60
OIR    2025130    131400   -9.7400 -136.6400      32.9        81       135        60
OIR    2025130    131400   -9.7400 -136.6500      32.5        79       130        60
OIR    2025130    131400   -9.7400 -136.6600      32.1        75       126        60
OIR    2025130    131400   -9.7400 -136.6700      32.0        73       126        60
OIR    2025130    131400   -9.7400 -136.6800      31.9        72       129        60
OIR    2025130    131400   -9.7400 -136.6900      31.8        71       132        60
OIR    2025130    131400   -9.7400 -136.7000      31.7        71       135        60
OIR    2025130    131400   -9.7400 -136.7100      31.6        71       137        60
OIR    2025130    131400   -9.7400 -136.7200      31.5        70       139        60
OIR    2025130    131400   -9.7400 -136.7300      30.5        70       138        60
OIR    2025130    131400   -9.7400 -136.7400      21.4        66       137        60
OIR    2025130    131400   -9.7400 -136.7500      18.4        58       134        60
OIR    2025130    131400   -9.7400 -136.7600      17.8        56       131        60
OIR    2025130    131400   -9.7400 -136.7700      19.1        56       125        60
OIR    2025130    131400   -9.7400 -136.7800      23.3        56       123        60
OIR    2025130    131400   -9.7400 -136.7900      25.9        55       121        60
OIR    2025130    131400   -9.7400 -136.8000      26.9        55       120        60
OIR    2025130    131400   -9.7400 -136.8100      27.4        54       119        60
OIR    2025130    131400   -9.7400 -136.8200      27.8        54       116        60
OIR    2025130    131400   -9.7400 -136.8300      28.0        54       114        60
OIR    2025130    131400   -9.7400 -136.8400      28.1        54       111        60
OIR    2025130    131400   -9.7400 -136.8500      28.2        53       108        60
OIR    2025130    131400   -9.7400 -136.8600      28.2        53       105        60
OIR    2025130    131400   -9.7400 -136.8700      28.2        53       104        60
OIR    2025130    131400   -9.7400 -136.8800      28.4        52       104        60
OIR    2025130    131400   -9.7400 -136.8900      28.5        51       103        60
OIR    2025130    131400   -9.7400 -136.9000      28.6        51       103        60
OIR    2025130    131400   -9.7400 -136.9100      28.6        50       104        60
OIR    2025130    131400   -9.7400 -136.9200      28.7        50       104        60
OIR    2025130    131400   -9.7400 -136.9300      28.7        50       105        60
OIR    2025130    131400   -9.7400 -136.9400      28.8        50       107        60
OIR    2025130    131400   -9.7400 -136.9500      28.9        49       107        60
OIR    2025130    131400   -9.7400 -136.9600      29.0        49       107        60
OIR    2025130    131400   -9.7400 -136.9700      29.1        49       104        60
OIR    2025130    131400   -9.7400 -136.9800      29.3        48       104        60
OIR    2025130    131400   -9.7400 -136.9900      29.4        48       105        60
OIR    2025130    131400   -9.7400 -137.0000      29.6        47       108        60
OIR    2025130    131400   -9.7400 -137.0100      29.9        46       110        60
OIR    2025130    131400   -9.7400 -137.0200      30.2        45       110        60
OIR    2025130    131400   -9.7400 -137.0300      30.4        45       110        60
OIR    2025130    131400   -9.7400 -137.0400      30.5        45       109        60
OIR    2025130    131400   -9.7400 -137.0500      30.7        45       107        60
OIR    2025130    131400   -9.7400 -137.0600      30.9        45       107        60
OIR    2025130    131400   -9.7400 -137.0700      31.1        45       105        60
OIR    2025130    131400   -9.7400 -137.0800      31.3        45       104        60
OIR    2025130    131400   -9.7400 -137.0900      31.5        45       104        60
OIR    2025130    131400   -9.7400 -137.1000      31.6        46       104        60
OIR    2025130    131400   -9.7400 -137.1100      31.8        46       104        60
OIR    2025130    131400   -9.7400 -137.1200      31.9        46       104        60
OIR    2025130    131400   -9.7400 -137.1300      32.0        46       104        60
OIR    2025130    131400   -9.7400 -137.1400      32.1        46       104        60
OIR    2025130    131400   -9.7400 -137.1500      32.3        47       104        60
OIR    2025130    131400   -9.7400 -137.1600      32.6        47       103        60
OIR    2025130    131400   -9.7400 -137.1700      33.2        48       103        60
OIR    2025130    131400   -9.7400 -137.1800      33.6        50       103        60
OIR    2025130    131400   -9.7400 -137.1900      33.7        50       104        60
OIR    2025130    131400   -9.7400 -137.2000      33.9        50       104        60
OIR    2025130    131400   -9.7400 -137.2100      34.0        50       105        60
OIR    2025130    131400   -9.7400 -137.2200      34.1        51       105        60
OIR    2025130    131400   -9.7400 -137.2300      34.3        51       104        60
OIR    2025130    131400   -9.7400 -137.2400      34.4        51       104        60
OIR    2025130    131400   -9.7400 -137.2500      34.7        51       103        60
OIR    2025130    131400   -9.7400 -137.2600      34.8        51       103        60
OIR    2025130    131400   -9.7400 -137.2700      34.9        51       103        60
OIR    2025130    131400   -9.7400 -137.2800      35.0        51       103        60
OIR    2025130    131400   -9.7400 -137.2900      35.0        51       103        60
OIR    2025130    131400   -9.7400 -137.3000      35.0        51       103        60
OIR    2025130    131400   -9.7400 -137.3100      34.9        51       103        60
OIR    2025130    131400   -9.7400 -137.3200      34.9        51       103        60
OIR    2025130    131400   -9.7400 -137.3300      34.9        51       103        60
OIR    2025130    131400   -9.7400 -137.3400      34.8        51       103        60
OIR    2025130    131400   -9.7400 -137.3500      34.6        52       103        60
OIR    2025130    131400   -9.7400 -137.3600      34.2        52       103        60
OIR    2025130    131400   -9.7400 -137.3700      33.4        53       103        60
OIR    2025130    131400   -9.7400 -137.3800      32.3        54       103        60
OIR    2025130    131400   -9.7400 -137.3900      31.0        55       103        60
OIR    2025130    131400   -9.7400 -137.4000      30.2        56       103        60
OIR    2025130    131400   -9.7400 -137.4100      29.8        58       103        60
OIR    2025130    131400   -9.7400 -137.4200      29.5        58       103        60
OIR    2025130    131400   -9.7400 -137.4300      29.4        59       103        60
OIR    2025130    131400   -9.7400 -137.4400      29.4        59       103        60
OIR    2025130    131400   -9.7400 -137.4500      29.5        58       103        60
OIR    2025130    131400   -9.7400 -137.4600      29.5        58       103        60
OIR    2025130    131400   -9.7400 -137.4700      29.5        58       103        60
OIR    2025130    131400   -9.7400 -137.4800      29.4        58       103        60
OIR    2025130    131400   -9.7400 -137.4900      29.4        57       103        60
OIR    2025130    131400   -9.7400 -137.5000      29.1        57       103        60
OIR    2025130    131400   -9.7400 -137.5100      28.6        57       103        60
OIR    2025130    131400   -9.7400 -137.5200      27.7        57       103        60
OIR    2025130    131400   -9.7400 -137.5300      26.6        58       103        60
OIR    2025130    131400   -9.7400 -137.5400      24.9        60       103        60
OIR    2025130    131400   -9.7400 -137.5500      22.7        63       103        60
OIR    2025130    131400   -9.7400 -137.5600      20.6        65       103        60
OIR    2025130    131400   -9.7400 -137.5700      18.6        67       103        60
OIR    2025130    131400   -9.7400 -137.5800      15.9        70       103        60
OIR    2025130    131400   -9.7400 -137.5900      14.1        76       103        60
OIR    2025130    131400   -9.7400 -137.6000      13.4        79       103        60
OIR    2025130    131400   -9.7400 -137.6100      13.4        74       103        60
OIR    2025130    131400   -9.7400 -137.6200      14.5        57       103        60
OIR    2025130    131400   -9.7400 -137.6300      21.1        32       103        60
OIR    2025130    131400   -9.7400 -137.6400      29.9        17       103        60
OIR    2025130    131400   -9.7400 -137.6500      34.1        14       104        60
OIR    2025130    131400   -9.7400 -137.6600      35.1        12       104        60
OIR    2025130    131400   -9.7400 -137.6700      35.4        12       104        60
OIR    2025130    131400   -9.7400 -137.6800      35.4        11       104        60
OIR    2025130    131400   -9.7400 -137.6900      35.4        11       103        60
OIR    2025130    131400   -9.7400 -137.7000      35.1        10       103        60
OIR    2025130    131400   -9.7400 -137.7100      34.2         9       103        60
OIR    2025130    131400   -9.7400 -137.7200      33.8         7       103        60
OIR    2025130    131400   -9.7400 -137.7300      33.7         6       103        60
OIR    2025130    131400   -9.7400 -137.7400      33.6         5       103        60
OIR    2025130    131400   -9.7400 -137.7500      33.6         3       103        60
OIR    2025130    131400   -9.7400 -137.7600      33.5         0       103        60
OIR    2025130    131400   -9.7400 -137.7700      33.5       359       103        60
OIR    2025130    131400   -9.7400 -137.7800      33.4       358       103        60
OIR    2025130    131400   -9.7400 -137.7900      33.4       357       103        60
OIR    2025130    131400   -9.7400 -137.8000      33.3       357       103        60
OIR    2025130    131400   -9.7400 -137.8100      33.2       356       103        60
OIR    2025130    131400   -9.7400 -137.8200      33.1       356       103        60
OIR    2025130    131400   -9.7400 -137.8300      33.1       355       103        60
OIR    2025130    131400   -9.7400 -137.8400      33.1       355       103        60
OIR    2025130    131400   -9.7400 -137.8500      33.0       354       103        60
OIR    2025130    131400   -9.7400 -137.8600      33.0       354       103        60
OIR    2025130    131400   -9.7400 -137.8700      33.0       354       103        60
OIR    2025130    131400   -9.7400 -137.8800      33.0       353       103        60
OIR    2025130    131400   -9.7400 -137.8900      32.9       353       103        60
OIR    2025130    131400   -9.7400 -137.9000      32.9       353       103        60
OIR    2025130    131400   -9.7400 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.7400 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7400 -137.9300      32.8       353       103        60
OIR    2025130    131400   -9.7400 -137.9400      32.7       353       103        60
OIR    2025130    131400   -9.7400 -137.9500      32.3       352       103        60
OIR    2025130    131400   -9.7400 -137.9600      32.0       352       104        60
OIR    2025130    131400   -9.7400 -137.9700      31.4       350       104        60
OIR    2025130    131400   -9.7400 -137.9800      31.1       350       105        60
OIR    2025130    131400   -9.7400 -137.9900      30.8       350       107        60
OIR    2025130    131400   -9.7400 -138.0000      30.6       349       108        60
OIR    2025130    131400   -9.7400 -138.0100      30.2       349       110        60
OIR    2025130    131400   -9.7400 -138.0200      29.5       349       113        60
OIR    2025130    131400   -9.7400 -138.0300      28.5       348       113        60
OIR    2025130    131400   -9.7400 -138.0400      27.1       347       114        60
OIR    2025130    131400   -9.7400 -138.0500      25.5       346       117        60
OIR    2025130    131400   -9.7400 -138.0600      24.9       346       122        60
OIR    2025130    131400   -9.7400 -138.0700      24.8       343       124        60
OIR    2025130    131400   -9.7400 -138.0800      24.8       342       128        60
OIR    2025130    131400   -9.7400 -138.0900      25.7       337       131        60
OIR    2025130    131400   -9.7400 -138.1000      27.5       330       134        60
OIR    2025130    131400   -9.7400 -138.1100      27.8       329       137        60
OIR    2025130    131400   -9.7400 -138.1200      28.1       327       141        60
OIR    2025130    131400   -9.7400 -138.1300      28.2       327       146        60
OIR    2025130    131400   -9.7400 -138.1400      28.2       327       143        60
OIR    2025130    131400   -9.7400 -138.1500      28.2       327       140        60
OIR    2025130    131400   -9.7400 -138.1600      28.2       327       141        60
OIR    2025130    131400   -9.7400 -138.1700      28.3       326       142        60
OIR    2025130    131400   -9.7400 -138.1800      28.3       326       140        60
OIR    2025130    131400   -9.7400 -138.1900      28.3       326       138        60
OIR    2025130    131400   -9.7400 -138.2000      28.1       327       135        60
OIR    2025130    131400   -9.7400 -138.2100      27.7       327       132        60
OIR    2025130    131400   -9.7400 -138.2200      27.2       327       128        60
OIR    2025130    131400   -9.7400 -138.2300      26.6       327       127        60
OIR    2025130    131400   -9.7400 -138.2400      25.9       328       127        60
OIR    2025130    131400   -9.7400 -138.2500      25.4       328       128        60
OIR    2025130    131400   -9.7400 -138.2600      25.1       328       129        60
OIR    2025130    131400   -9.7400 -138.2700      24.9       328       130        60
OIR    2025130    131400   -9.7400 -138.2800      24.8       329       132        60
OIR    2025130    131400   -9.7400 -138.2900      24.7       328       131        60
OIR    2025130    131400   -9.7400 -138.3000      24.5       328       130        60
OIR    2025130    131400   -9.7400 -138.3100      24.4       328       129        60
OIR    2025130    131400   -9.7400 -138.3200      24.3       329       129        60
OIR    2025130    131400   -9.7400 -138.3300      24.2       329       131        60
OIR    2025130    131400   -9.7400 -138.3400      24.1       329       133        60
OIR    2025130    131400   -9.7400 -138.3500      24.0       329       134        60
OIR    2025130    131400   -9.7400 -138.3600      23.9       329       135        60
OIR    2025130    131400   -9.7400 -138.3700      23.6       329       137        60
OIR    2025130    131400   -9.7400 -138.3800      23.3       329       138        60
OIR    2025130    131400   -9.7400 -138.3900      22.7       330       140        60
OIR    2025130    131400   -9.7400 -138.4000      22.1       331       142        60
OIR    2025130    131400   -9.7400 -138.4100      21.4       332       144        60
OIR    2025130    131400   -9.7400 -138.4200      21.0       333       147        60
OIR    2025130    131400   -9.7500 -136.0600      42.5        77       147        60
OIR    2025130    131400   -9.7500 -136.0700      42.6        77       145        60
OIR    2025130    131400   -9.7500 -136.0800      42.7        77       145        60
OIR    2025130    131400   -9.7500 -136.0900      42.8        77       146        60
OIR    2025130    131400   -9.7500 -136.1000      42.8        77       147        60
OIR    2025130    131400   -9.7500 -136.1200      43.0        77       146        60
OIR    2025130    131400   -9.7500 -136.1300      43.1        77       144        60
OIR    2025130    131400   -9.7500 -136.1400      43.3        77       144        60
OIR    2025130    131400   -9.7500 -136.1500      43.4        77       143        60
OIR    2025130    131400   -9.7500 -136.1600      43.6        77       141        60
OIR    2025130    131400   -9.7500 -136.1700      43.7        77       139        60
OIR    2025130    131400   -9.7500 -136.1800      43.7        77       140        60
OIR    2025130    131400   -9.7500 -136.1900      43.7        77       140        60
OIR    2025130    131400   -9.7500 -136.2000      43.6        77       140        60
OIR    2025130    131400   -9.7500 -136.2100      43.5        77       139        60
OIR    2025130    131400   -9.7500 -136.2200      43.2        78       135        60
OIR    2025130    131400   -9.7500 -136.2300      43.0        78       130        60
OIR    2025130    131400   -9.7500 -136.2400      42.9        78       124        60
OIR    2025130    131400   -9.7500 -136.2500      42.9        78       122        60
OIR    2025130    131400   -9.7500 -136.2600      43.0        78       126        60
OIR    2025130    131400   -9.7500 -136.2700      43.0        78       128        60
OIR    2025130    131400   -9.7500 -136.2800      42.8        79       130        60
OIR    2025130    131400   -9.7500 -136.2900      42.6        80       133        60
OIR    2025130    131400   -9.7500 -136.3000      42.0        80       136        60
OIR    2025130    131400   -9.7500 -136.3300      37.6        72       146        60
OIR    2025130    131400   -9.7500 -136.3400      37.1        71       141        60
OIR    2025130    131400   -9.7500 -136.3500      37.1        70       138        60
OIR    2025130    131400   -9.7500 -136.3600      37.8        70       135        60
OIR    2025130    131400   -9.7500 -136.3700      38.5        71       133        60
OIR    2025130    131400   -9.7500 -136.3800      39.0        71       132        60
OIR    2025130    131400   -9.7500 -136.3900      39.3        70       132        60
OIR    2025130    131400   -9.7500 -136.4000      39.2        70       134        60
OIR    2025130    131400   -9.7500 -136.4100      39.2        70       136        60
OIR    2025130    131400   -9.7500 -136.4200      39.3        70       140        60
OIR    2025130    131400   -9.7500 -136.4300      39.1        71       142        60
OIR    2025130    131400   -9.7500 -136.4400      38.7        71       141        60
OIR    2025130    131400   -9.7500 -136.4500      38.0        72       139        60
OIR    2025130    131400   -9.7500 -136.4600      36.6        74       137        60
OIR    2025130    131400   -9.7500 -136.4700      35.8        75       135        60
OIR    2025130    131400   -9.7500 -136.4800      35.5        75       135        60
OIR    2025130    131400   -9.7500 -136.4900      34.9        74       130        60
OIR    2025130    131400   -9.7500 -136.5000      34.0        72       126        60
OIR    2025130    131400   -9.7500 -136.5100      32.2        70       124        60
OIR    2025130    131400   -9.7500 -136.5200      31.6        67       122        60
OIR    2025130    131400   -9.7500 -136.5300      31.7        67       124        60
OIR    2025130    131400   -9.7500 -136.5400      32.0        67       127        60
OIR    2025130    131400   -9.7500 -136.5500      31.9        67       131        60
OIR    2025130    131400   -9.7500 -136.5600      32.1        68       131        60
OIR    2025130    131400   -9.7500 -136.5700      32.7        71       130        60
OIR    2025130    131400   -9.7500 -136.5800      34.2        79       129        60
OIR    2025130    131400   -9.7500 -136.5900      35.6        82       129        60
OIR    2025130    131400   -9.7500 -136.6000      35.7        83       132        60
OIR    2025130    131400   -9.7500 -136.6100      35.7        83       135        60
OIR    2025130    131400   -9.7500 -136.6200      35.7        83       139        60
OIR    2025130    131400   -9.7500 -136.6300      35.1        82       144        60
OIR    2025130    131400   -9.7500 -136.6400      33.8        81       139        60
OIR    2025130    131400   -9.7500 -136.6500      32.6        79       134        60
OIR    2025130    131400   -9.7500 -136.6600      31.8        75       126        60
OIR    2025130    131400   -9.7500 -136.6700      31.8        72       125        60
OIR    2025130    131400   -9.7500 -136.6800      31.8        72       126        60
OIR    2025130    131400   -9.7500 -136.6900      31.9        71       129        60
OIR    2025130    131400   -9.7500 -136.7000      31.8        71       134        60
OIR    2025130    131400   -9.7500 -136.7100      31.7        71       137        60
OIR    2025130    131400   -9.7500 -136.7200      31.1        70       140        60
OIR    2025130    131400   -9.7500 -136.7300      29.2        69       140        60
OIR    2025130    131400   -9.7500 -136.7400      21.1        66       139        60
OIR    2025130    131400   -9.7500 -136.7500      17.2        54       137        60
OIR    2025130    131400   -9.7500 -136.7600      17.4        53       133        60
OIR    2025130    131400   -9.7500 -136.7700      17.8        52       125        60
OIR    2025130    131400   -9.7500 -136.7800      23.0        54       122        60
OIR    2025130    131400   -9.7500 -136.7900      25.8        54       120        60
OIR    2025130    131400   -9.7500 -136.8000      26.9        54       117        60
OIR    2025130    131400   -9.7500 -136.8100      27.6        54       116        60
OIR    2025130    131400   -9.7500 -136.8200      28.0        54       115        60
OIR    2025130    131400   -9.7500 -136.8300      28.1        54       113        60
OIR    2025130    131400   -9.7500 -136.8400      28.3        53       110        60
OIR    2025130    131400   -9.7500 -136.8500      28.3        53       107        60
OIR    2025130    131400   -9.7500 -136.8600      28.4        52       105        60
OIR    2025130    131400   -9.7500 -136.8700      28.4        52       104        60
OIR    2025130    131400   -9.7500 -136.8800      28.5        51       103        60
OIR    2025130    131400   -9.7500 -136.8900      28.6        51       103        60
OIR    2025130    131400   -9.7500 -136.9000      28.7        51       103        60
OIR    2025130    131400   -9.7500 -136.9100      28.7        50       104        60
OIR    2025130    131400   -9.7500 -136.9200      28.7        50       104        60
OIR    2025130    131400   -9.7500 -136.9300      28.8        50       105        60
OIR    2025130    131400   -9.7500 -136.9400      28.9        50       105        60
OIR    2025130    131400   -9.7500 -136.9500      29.0        49       105        60
OIR    2025130    131400   -9.7500 -136.9600      29.1        49       105        60
OIR    2025130    131400   -9.7500 -136.9700      29.2        48       104        60
OIR    2025130    131400   -9.7500 -136.9800      29.4        48       104        60
OIR    2025130    131400   -9.7500 -136.9900      29.5        47       105        60
OIR    2025130    131400   -9.7500 -137.0000      29.8        46       107        60
OIR    2025130    131400   -9.7500 -137.0100      30.0        45       109        60
OIR    2025130    131400   -9.7500 -137.0200      30.2        45       109        60
OIR    2025130    131400   -9.7500 -137.0300      30.4        45       108        60
OIR    2025130    131400   -9.7500 -137.0400      30.5        45       107        60
OIR    2025130    131400   -9.7500 -137.0500      30.7        45       105        60
OIR    2025130    131400   -9.7500 -137.0600      30.9        45       104        60
OIR    2025130    131400   -9.7500 -137.0700      31.1        45       104        60
OIR    2025130    131400   -9.7500 -137.0800      31.3        45       104        60
OIR    2025130    131400   -9.7500 -137.0900      31.4        45       103        60
OIR    2025130    131400   -9.7500 -137.1000      31.6        45       104        60
OIR    2025130    131400   -9.7500 -137.1100      31.8        46       104        60
OIR    2025130    131400   -9.7500 -137.1200      31.9        46       104        60
OIR    2025130    131400   -9.7500 -137.1300      32.0        46       104        60
OIR    2025130    131400   -9.7500 -137.1400      32.1        46       104        60
OIR    2025130    131400   -9.7500 -137.1500      32.2        46       103        60
OIR    2025130    131400   -9.7500 -137.1600      32.4        46       103        60
OIR    2025130    131400   -9.7500 -137.1700      32.7        47       103        60
OIR    2025130    131400   -9.7500 -137.1800      33.3        49       103        60
OIR    2025130    131400   -9.7500 -137.1900      33.5        49       104        60
OIR    2025130    131400   -9.7500 -137.2000      33.8        50       104        60
OIR    2025130    131400   -9.7500 -137.2100      33.9        50       104        60
OIR    2025130    131400   -9.7500 -137.2200      34.1        50       104        60
OIR    2025130    131400   -9.7500 -137.2300      34.4        50       104        60
OIR    2025130    131400   -9.7500 -137.2400      34.8        50       104        60
OIR    2025130    131400   -9.7500 -137.2500      35.0        50       103        60
OIR    2025130    131400   -9.7500 -137.2600      35.2        50       103        60
OIR    2025130    131400   -9.7500 -137.2700      35.3        50       103        60
OIR    2025130    131400   -9.7500 -137.2800      35.3        50       103        60
OIR    2025130    131400   -9.7500 -137.2900      35.3        50       103        60
OIR    2025130    131400   -9.7500 -137.3000      35.3        50       103        60
OIR    2025130    131400   -9.7500 -137.3100      35.3        51       103        60
OIR    2025130    131400   -9.7500 -137.3200      35.3        51       103        60
OIR    2025130    131400   -9.7500 -137.3300      35.2        51       103        60
OIR    2025130    131400   -9.7500 -137.3400      35.1        51       103        60
OIR    2025130    131400   -9.7500 -137.3500      35.0        51       103        60
OIR    2025130    131400   -9.7500 -137.3600      34.8        51       103        60
OIR    2025130    131400   -9.7500 -137.3700      34.3        51       103        60
OIR    2025130    131400   -9.7500 -137.3800      33.9        52       103        60
OIR    2025130    131400   -9.7500 -137.3900      33.1        52       103        60
OIR    2025130    131400   -9.7500 -137.4000      31.7        54       103        60
OIR    2025130    131400   -9.7500 -137.4100      30.8        55       103        60
OIR    2025130    131400   -9.7500 -137.4200      30.2        56       103        60
OIR    2025130    131400   -9.7500 -137.4300      29.9        57       103        60
OIR    2025130    131400   -9.7500 -137.4400      29.9        57       103        60
OIR    2025130    131400   -9.7500 -137.4500      29.9        56       103        60
OIR    2025130    131400   -9.7500 -137.4600      30.0        56       103        60
OIR    2025130    131400   -9.7500 -137.4700      30.0        56       103        60
OIR    2025130    131400   -9.7500 -137.4800      29.8        55       103        60
OIR    2025130    131400   -9.7500 -137.4900      29.6        55       103        60
OIR    2025130    131400   -9.7500 -137.5000      29.4        54       103        60
OIR    2025130    131400   -9.7500 -137.5100      29.0        54       103        60
OIR    2025130    131400   -9.7500 -137.5200      28.4        54       103        60
OIR    2025130    131400   -9.7500 -137.5300      27.5        54       103        60
OIR    2025130    131400   -9.7500 -137.5400      26.4        55       103        60
OIR    2025130    131400   -9.7500 -137.5500      24.8        56       103        60
OIR    2025130    131400   -9.7500 -137.5600      22.5        57       103        60
OIR    2025130    131400   -9.7500 -137.5700      20.6        57       103        60
OIR    2025130    131400   -9.7500 -137.5800      19.0        55       103        60
OIR    2025130    131400   -9.7500 -137.5900      17.5        53       103        60
OIR    2025130    131400   -9.7500 -137.6000      17.2        47       104        60
OIR    2025130    131400   -9.7500 -137.6100      18.7        39       104        60
OIR    2025130    131400   -9.7500 -137.6200      21.8        27       104        60
OIR    2025130    131400   -9.7500 -137.6300      28.7        17       104        60
OIR    2025130    131400   -9.7500 -137.6400      33.7        14       103        60
OIR    2025130    131400   -9.7500 -137.6500      35.1        12       103        60
OIR    2025130    131400   -9.7500 -137.6600      35.5        12       103        60
OIR    2025130    131400   -9.7500 -137.6700      35.6        11       103        60
OIR    2025130    131400   -9.7500 -137.6800      35.6        11       103        60
OIR    2025130    131400   -9.7500 -137.6900      35.6        11       104        60
OIR    2025130    131400   -9.7500 -137.7000      35.6        10       103        60
OIR    2025130    131400   -9.7500 -137.7100      35.3         9       103        60
OIR    2025130    131400   -9.7500 -137.7200      34.9         7       103        60
OIR    2025130    131400   -9.7500 -137.7300      34.5         6       103        60
OIR    2025130    131400   -9.7500 -137.7400      34.3         5       103        60
OIR    2025130    131400   -9.7500 -137.7500      34.2         3       103        60
OIR    2025130    131400   -9.7500 -137.7600      34.0         0       103        60
OIR    2025130    131400   -9.7500 -137.7700      33.9       359       103        60
OIR    2025130    131400   -9.7500 -137.7800      33.8       358       103        60
OIR    2025130    131400   -9.7500 -137.7900      33.7       357       103        60
OIR    2025130    131400   -9.7500 -137.8000      33.6       357       103        60
OIR    2025130    131400   -9.7500 -137.8100      33.5       356       103        60
OIR    2025130    131400   -9.7500 -137.8200      33.4       356       103        60
OIR    2025130    131400   -9.7500 -137.8300      33.3       355       103        60
OIR    2025130    131400   -9.7500 -137.8400      33.2       355       103        60
OIR    2025130    131400   -9.7500 -137.8500      33.2       354       103        60
OIR    2025130    131400   -9.7500 -137.8600      33.1       354       103        60
OIR    2025130    131400   -9.7500 -137.8700      33.0       354       103        60
OIR    2025130    131400   -9.7500 -137.8800      33.0       353       103        60
OIR    2025130    131400   -9.7500 -137.8900      33.0       353       103        60
OIR    2025130    131400   -9.7500 -137.9000      32.9       353       103        60
OIR    2025130    131400   -9.7500 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.7500 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7500 -137.9300      32.8       353       103        60
OIR    2025130    131400   -9.7500 -137.9400      32.6       353       103        60
OIR    2025130    131400   -9.7500 -137.9500      32.3       352       103        60
OIR    2025130    131400   -9.7500 -137.9600      31.9       351       103        60
OIR    2025130    131400   -9.7500 -137.9700      31.4       350       103        60
OIR    2025130    131400   -9.7500 -137.9800      31.2       350       104        60
OIR    2025130    131400   -9.7500 -137.9900      31.0       350       104        60
OIR    2025130    131400   -9.7500 -138.0000      30.9       350       105        60
OIR    2025130    131400   -9.7500 -138.0100      30.7       349       109        60
OIR    2025130    131400   -9.7500 -138.0200      30.2       349       112        60
OIR    2025130    131400   -9.7500 -138.0300      29.5       349       113        60
OIR    2025130    131400   -9.7500 -138.0400      27.9       348       114        60
OIR    2025130    131400   -9.7500 -138.0500      26.1       347       117        60
OIR    2025130    131400   -9.7500 -138.0600      25.4       347       123        60
OIR    2025130    131400   -9.7500 -138.0700      25.1       344       127        60
OIR    2025130    131400   -9.7500 -138.0800      25.1       343       130        60
OIR    2025130    131400   -9.7500 -138.0900      26.0       338       132        60
OIR    2025130    131400   -9.7500 -138.1000      27.6       331       135        60
OIR    2025130    131400   -9.7500 -138.1100      28.0       329       137        60
OIR    2025130    131400   -9.7500 -138.1200      28.3       328       140        60
OIR    2025130    131400   -9.7500 -138.1300      28.4       327       143        60
OIR    2025130    131400   -9.7500 -138.1400      28.4       327       142        60
OIR    2025130    131400   -9.7500 -138.1500      28.3       327       140        60
OIR    2025130    131400   -9.7500 -138.1600      28.3       327       141        60
OIR    2025130    131400   -9.7500 -138.1700      28.5       327       142        60
OIR    2025130    131400   -9.7500 -138.1800      28.5       327       139        60
OIR    2025130    131400   -9.7500 -138.1900      28.4       327       136        60
OIR    2025130    131400   -9.7500 -138.2000      28.3       327       133        60
OIR    2025130    131400   -9.7500 -138.2100      28.2       327       130        60
OIR    2025130    131400   -9.7500 -138.2200      27.7       327       126        60
OIR    2025130    131400   -9.7500 -138.2300      26.9       327       124        60
OIR    2025130    131400   -9.7500 -138.2400      26.1       328       124        60
OIR    2025130    131400   -9.7500 -138.2500      25.5       328       126        60
OIR    2025130    131400   -9.7500 -138.2600      25.3       329       127        60
OIR    2025130    131400   -9.7500 -138.2700      25.1       329       129        60
OIR    2025130    131400   -9.7500 -138.2800      25.0       329       130        60
OIR    2025130    131400   -9.7500 -138.2900      24.8       328       131        60
OIR    2025130    131400   -9.7500 -138.3000      24.6       328       131        60
OIR    2025130    131400   -9.7500 -138.3100      24.5       328       130        60
OIR    2025130    131400   -9.7500 -138.3200      24.4       328       130        60
OIR    2025130    131400   -9.7500 -138.3300      24.4       329       133        60
OIR    2025130    131400   -9.7500 -138.3400      24.3       329       134        60
OIR    2025130    131400   -9.7500 -138.3500      24.2       329       135        60
OIR    2025130    131400   -9.7500 -138.3600      24.1       329       136        60
OIR    2025130    131400   -9.7500 -138.3700      24.0       329       138        60
OIR    2025130    131400   -9.7500 -138.3800      23.7       329       140        60
OIR    2025130    131400   -9.7500 -138.3900      23.2       329       142        60
OIR    2025130    131400   -9.7500 -138.4000      22.7       330       144        60
OIR    2025130    131400   -9.7500 -138.4100      22.2       330       147        60
OIR    2025130    131400   -9.7600 -136.1300      43.1        76       148        60
OIR    2025130    131400   -9.7600 -136.1400      43.2        76       148        60
OIR    2025130    131400   -9.7600 -136.1500      43.3        77       148        60
OIR    2025130    131400   -9.7600 -136.1600      43.5        77       144        60
OIR    2025130    131400   -9.7600 -136.1700      43.6        77       140        60
OIR    2025130    131400   -9.7600 -136.1800      43.6        77       141        60
OIR    2025130    131400   -9.7600 -136.1900      43.6        77       141        60
OIR    2025130    131400   -9.7600 -136.2000      43.6        77       143        60
OIR    2025130    131400   -9.7600 -136.2100      43.5        77       143        60
OIR    2025130    131400   -9.7600 -136.2200      43.4        77       140        60
OIR    2025130    131400   -9.7600 -136.2300      43.1        77       134        60
OIR    2025130    131400   -9.7600 -136.2400      42.9        77       125        60
OIR    2025130    131400   -9.7600 -136.2500      43.0        77       124        60
OIR    2025130    131400   -9.7600 -136.2600      43.2        78       125        60
OIR    2025130    131400   -9.7600 -136.2700      43.1        78       127        60
OIR    2025130    131400   -9.7600 -136.2800      42.9        79       131        60
OIR    2025130    131400   -9.7600 -136.2900      42.4        79       135        60
OIR    2025130    131400   -9.7600 -136.3000      39.6        78       139        60
OIR    2025130    131400   -9.7600 -136.3400      36.0        67       141        60
OIR    2025130    131400   -9.7600 -136.3500      36.5        67       137        60
OIR    2025130    131400   -9.7600 -136.3600      37.6        69       135        60
OIR    2025130    131400   -9.7600 -136.3700      38.5        69       133        60
OIR    2025130    131400   -9.7600 -136.3800      39.0        69       133        60
OIR    2025130    131400   -9.7600 -136.3900      39.1        69       133        60
OIR    2025130    131400   -9.7600 -136.4000      39.1        69       133        60
OIR    2025130    131400   -9.7600 -136.4100      39.1        69       134        60
OIR    2025130    131400   -9.7600 -136.4200      39.1        69       137        60
OIR    2025130    131400   -9.7600 -136.4300      39.1        69       140        60
OIR    2025130    131400   -9.7600 -136.4400      39.0        69       142        60
OIR    2025130    131400   -9.7600 -136.4500      38.8        70       141        60
OIR    2025130    131400   -9.7600 -136.4600      37.4        71       139        60
OIR    2025130    131400   -9.7600 -136.4700      36.4        73       136        60
OIR    2025130    131400   -9.7600 -136.4800      36.1        73       134        60
OIR    2025130    131400   -9.7600 -136.4900      35.2        72       129        60
OIR    2025130    131400   -9.7600 -136.5000      34.2        71       123        60
OIR    2025130    131400   -9.7600 -136.5100      32.4        68       121        60
OIR    2025130    131400   -9.7600 -136.5200      31.8        67       120        60
OIR    2025130    131400   -9.7600 -136.5300      31.7        66       120        60
OIR    2025130    131400   -9.7600 -136.5400      32.1        66       123        60
OIR    2025130    131400   -9.7600 -136.5500      32.1        66       130        60
OIR    2025130    131400   -9.7600 -136.5600      32.5        66       132        60
OIR    2025130    131400   -9.7600 -136.5700      33.2        68       132        60
OIR    2025130    131400   -9.7600 -136.5800      34.3        76       131        60
OIR    2025130    131400   -9.7600 -136.5900      35.6        80       129        60
OIR    2025130    131400   -9.7600 -136.6000      36.1        82       131        60
OIR    2025130    131400   -9.7600 -136.6100      35.8        83       134        60
OIR    2025130    131400   -9.7600 -136.6200      35.7        83       137        60
OIR    2025130    131400   -9.7600 -136.6300      34.7        83       140        60
OIR    2025130    131400   -9.7600 -136.6400      33.7        79       139        60
OIR    2025130    131400   -9.7600 -136.6500      32.5        74       135        60
OIR    2025130    131400   -9.7600 -136.6600      31.8        71       125        60
OIR    2025130    131400   -9.7600 -136.6700      32.1        71       122        60
OIR    2025130    131400   -9.7600 -136.6800      32.2        71       123        60
OIR    2025130    131400   -9.7600 -136.6900      32.3        71       126        60
OIR    2025130    131400   -9.7600 -136.7000      32.2        70       131        60
OIR    2025130    131400   -9.7600 -136.7100      32.1        70       137        60
OIR    2025130    131400   -9.7600 -136.7200      31.2        69       142        60
OIR    2025130    131400   -9.7600 -136.7300      29.5        68       142        60
OIR    2025130    131400   -9.7600 -136.7400      22.1        63       142        60
OIR    2025130    131400   -9.7600 -136.7500      17.1        48       139        60
OIR    2025130    131400   -9.7600 -136.7600      17.8        48       134        60
OIR    2025130    131400   -9.7600 -136.7700      17.9        47       124        60
OIR    2025130    131400   -9.7600 -136.7800      23.6        52       120        60
OIR    2025130    131400   -9.7600 -136.7900      26.0        53       116        60
OIR    2025130    131400   -9.7600 -136.8000      27.1        53       115        60
OIR    2025130    131400   -9.7600 -136.8100      27.8        53       115        60
OIR    2025130    131400   -9.7600 -136.8200      28.2        53       113        60
OIR    2025130    131400   -9.7600 -136.8300      28.3        53       111        60
OIR    2025130    131400   -9.7600 -136.8400      28.5        53       109        60
OIR    2025130    131400   -9.7600 -136.8500      28.6        52       107        60
OIR    2025130    131400   -9.7600 -136.8600      28.6        52       104        60
OIR    2025130    131400   -9.7600 -136.8700      28.7        51       104        60
OIR    2025130    131400   -9.7600 -136.8800      28.7        51       103        60
OIR    2025130    131400   -9.7600 -136.8900      28.7        50       103        60
OIR    2025130    131400   -9.7600 -136.9000      28.7        50       103        60
OIR    2025130    131400   -9.7600 -136.9100      28.8        50       103        60
OIR    2025130    131400   -9.7600 -136.9200      28.8        50       104        60
OIR    2025130    131400   -9.7600 -136.9300      28.9        49       104        60
OIR    2025130    131400   -9.7600 -136.9400      29.0        49       104        60
OIR    2025130    131400   -9.7600 -136.9500      29.1        48       104        60
OIR    2025130    131400   -9.7600 -136.9600      29.3        48       104        60
OIR    2025130    131400   -9.7600 -136.9700      29.4        47       104        60
OIR    2025130    131400   -9.7600 -136.9800      29.5        47       103        60
OIR    2025130    131400   -9.7600 -136.9900      29.7        46       104        60
OIR    2025130    131400   -9.7600 -137.0000      29.9        46       104        60
OIR    2025130    131400   -9.7600 -137.0100      30.1        45       107        60
OIR    2025130    131400   -9.7600 -137.0200      30.2        45       107        60
OIR    2025130    131400   -9.7600 -137.0300      30.4        45       107        60
OIR    2025130    131400   -9.7600 -137.0400      30.5        45       105        60
OIR    2025130    131400   -9.7600 -137.0500      30.7        45       104        60
OIR    2025130    131400   -9.7600 -137.0600      30.8        45       104        60
OIR    2025130    131400   -9.7600 -137.0700      31.0        45       104        60
OIR    2025130    131400   -9.7600 -137.0800      31.2        45       103        60
OIR    2025130    131400   -9.7600 -137.0900      31.4        45       103        60
OIR    2025130    131400   -9.7600 -137.1000      31.6        45       103        60
OIR    2025130    131400   -9.7600 -137.1100      31.8        45       103        60
OIR    2025130    131400   -9.7600 -137.1200      31.9        46       103        60
OIR    2025130    131400   -9.7600 -137.1300      32.0        46       103        60
OIR    2025130    131400   -9.7600 -137.1400      32.1        46       103        60
OIR    2025130    131400   -9.7600 -137.1500      32.2        46       103        60
OIR    2025130    131400   -9.7600 -137.1600      32.3        46       103        60
OIR    2025130    131400   -9.7600 -137.1700      32.4        46       103        60
OIR    2025130    131400   -9.7600 -137.1800      32.9        47       103        60
OIR    2025130    131400   -9.7600 -137.1900      33.0        48       103        60
OIR    2025130    131400   -9.7600 -137.2000      33.4        49       103        60
OIR    2025130    131400   -9.7600 -137.2100      33.7        49       104        60
OIR    2025130    131400   -9.7600 -137.2200      34.0        50       104        60
OIR    2025130    131400   -9.7600 -137.2300      34.7        50       104        60
OIR    2025130    131400   -9.7600 -137.2400      35.0        50       104        60
OIR    2025130    131400   -9.7600 -137.2500      35.2        50       103        60
OIR    2025130    131400   -9.7600 -137.2600      35.4        50       103        60
OIR    2025130    131400   -9.7600 -137.2700      35.4        50       103        60
OIR    2025130    131400   -9.7600 -137.2800      35.5        50       103        60
OIR    2025130    131400   -9.7600 -137.2900      35.5        50       103        60
OIR    2025130    131400   -9.7600 -137.3000      35.5        50       103        60
OIR    2025130    131400   -9.7600 -137.3100      35.5        50       103        60
OIR    2025130    131400   -9.7600 -137.3200      35.4        50       103        60
OIR    2025130    131400   -9.7600 -137.3300      35.4        50       103        60
OIR    2025130    131400   -9.7600 -137.3400      35.4        51       103        60
OIR    2025130    131400   -9.7600 -137.3500      35.3        51       103        60
OIR    2025130    131400   -9.7600 -137.3600      35.2        51       103        60
OIR    2025130    131400   -9.7600 -137.3700      34.9        50       103        60
OIR    2025130    131400   -9.7600 -137.3800      34.6        51       103        60
OIR    2025130    131400   -9.7600 -137.3900      34.2        51       103        60
OIR    2025130    131400   -9.7600 -137.4000      33.5        51       103        60
OIR    2025130    131400   -9.7600 -137.4100      32.5        52       103        60
OIR    2025130    131400   -9.7600 -137.4200      31.5        53       103        60
OIR    2025130    131400   -9.7600 -137.4300      30.9        53       103        60
OIR    2025130    131400   -9.7600 -137.4400      30.6        53       103        60
OIR    2025130    131400   -9.7600 -137.4500      30.5        53       103        60
OIR    2025130    131400   -9.7600 -137.4600      30.5        53       103        60
OIR    2025130    131400   -9.7600 -137.4700      30.5        52       103        60
OIR    2025130    131400   -9.7600 -137.4800      30.3        52       103        60
OIR    2025130    131400   -9.7600 -137.4900      29.9        52       103        60
OIR    2025130    131400   -9.7600 -137.5000      29.6        52       103        60
OIR    2025130    131400   -9.7600 -137.5100      29.3        52       103        60
OIR    2025130    131400   -9.7600 -137.5200      28.9        51       103        60
OIR    2025130    131400   -9.7600 -137.5300      28.2        51       103        60
OIR    2025130    131400   -9.7600 -137.5400      27.5        51       103        60
OIR    2025130    131400   -9.7600 -137.5500      26.7        50       103        60
OIR    2025130    131400   -9.7600 -137.5600      25.3        49       103        60
OIR    2025130    131400   -9.7600 -137.5700      23.6        47       103        60
OIR    2025130    131400   -9.7600 -137.5800      22.6        44       103        60
OIR    2025130    131400   -9.7600 -137.5900      22.0        39       104        60
OIR    2025130    131400   -9.7600 -137.6000      22.5        32       105        60
OIR    2025130    131400   -9.7600 -137.6100      24.7        26       108        60
OIR    2025130    131400   -9.7600 -137.6200      28.0        20       109        60
OIR    2025130    131400   -9.7600 -137.6300      32.5        14       104        60
OIR    2025130    131400   -9.7600 -137.6400      34.9        13       103        60
OIR    2025130    131400   -9.7600 -137.6500      35.4        12       103        60
OIR    2025130    131400   -9.7600 -137.6600      35.6        12       103        60
OIR    2025130    131400   -9.7600 -137.6700      35.7        11       103        60
OIR    2025130    131400   -9.7600 -137.6800      35.8        11       104        60
OIR    2025130    131400   -9.7600 -137.6900      35.8        10       104        60
OIR    2025130    131400   -9.7600 -137.7000      35.8        10       104        60
OIR    2025130    131400   -9.7600 -137.7100      35.8         9       103        60
OIR    2025130    131400   -9.7600 -137.7200      35.6         8       103        60
OIR    2025130    131400   -9.7600 -137.7300      35.3         6       103        60
OIR    2025130    131400   -9.7600 -137.7400      35.0         5       103        60
OIR    2025130    131400   -9.7600 -137.7500      34.7         3       103        60
OIR    2025130    131400   -9.7600 -137.7600      34.4         0       103        60
OIR    2025130    131400   -9.7600 -137.7700      34.3       359       103        60
OIR    2025130    131400   -9.7600 -137.7800      34.1       358       103        60
OIR    2025130    131400   -9.7600 -137.7900      34.0       357       103        60
OIR    2025130    131400   -9.7600 -137.8000      33.9       357       103        60
OIR    2025130    131400   -9.7600 -137.8100      33.8       356       103        60
OIR    2025130    131400   -9.7600 -137.8200      33.6       356       103        60
OIR    2025130    131400   -9.7600 -137.8300      33.5       355       103        60
OIR    2025130    131400   -9.7600 -137.8400      33.4       355       103        60
OIR    2025130    131400   -9.7600 -137.8500      33.3       354       103        60
OIR    2025130    131400   -9.7600 -137.8600      33.2       354       103        60
OIR    2025130    131400   -9.7600 -137.8700      33.1       354       103        60
OIR    2025130    131400   -9.7600 -137.8800      33.0       353       103        60
OIR    2025130    131400   -9.7600 -137.8900      33.0       353       103        60
OIR    2025130    131400   -9.7600 -137.9000      33.0       353       103        60
OIR    2025130    131400   -9.7600 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.7600 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7600 -137.9300      32.7       353       103        60
OIR    2025130    131400   -9.7600 -137.9400      32.5       353       103        60
OIR    2025130    131400   -9.7600 -137.9500      32.2       352       103        60
OIR    2025130    131400   -9.7600 -137.9600      31.8       351       103        60
OIR    2025130    131400   -9.7600 -137.9700      31.4       350       103        60
OIR    2025130    131400   -9.7600 -137.9800      31.3       350       103        60
OIR    2025130    131400   -9.7600 -137.9900      31.1       350       104        60
OIR    2025130    131400   -9.7600 -138.0000      31.0       350       105        60
OIR    2025130    131400   -9.7600 -138.0100      30.9       350       108        60
OIR    2025130    131400   -9.7600 -138.0200      30.7       350       111        60
OIR    2025130    131400   -9.7600 -138.0300      30.1       349       112        60
OIR    2025130    131400   -9.7600 -138.0400      28.9       349       113        60
OIR    2025130    131400   -9.7600 -138.0500      27.1       348       117        60
OIR    2025130    131400   -9.7600 -138.0600      26.1       347       123        60
OIR    2025130    131400   -9.7600 -138.0700      25.5       346       129        60
OIR    2025130    131400   -9.7600 -138.0800      25.4       344       133        60
OIR    2025130    131400   -9.7600 -138.0900      26.1       340       134        60
OIR    2025130    131400   -9.7600 -138.1000      27.7       332       135        60
OIR    2025130    131400   -9.7600 -138.1100      28.3       329       137        60
OIR    2025130    131400   -9.7600 -138.1200      28.5       328       139        60
OIR    2025130    131400   -9.7600 -138.1300      28.5       328       141        60
OIR    2025130    131400   -9.7600 -138.1400      28.5       327       141        60
OIR    2025130    131400   -9.7600 -138.1500      28.5       327       141        60
OIR    2025130    131400   -9.7600 -138.1600      28.6       327       142        60
OIR    2025130    131400   -9.7600 -138.1700      28.6       327       143        60
OIR    2025130    131400   -9.7600 -138.1800      28.5       327       139        60
OIR    2025130    131400   -9.7600 -138.1900      28.5       327       135        60
OIR    2025130    131400   -9.7600 -138.2000      28.5       327       131        60
OIR    2025130    131400   -9.7600 -138.2100      28.3       327       127        60
OIR    2025130    131400   -9.7600 -138.2200      27.9       327       124        60
OIR    2025130    131400   -9.7600 -138.2300      27.0       328       122        60
OIR    2025130    131400   -9.7600 -138.2400      26.2       328       122        60
OIR    2025130    131400   -9.7600 -138.2500      25.6       329       124        60
OIR    2025130    131400   -9.7600 -138.2600      25.3       329       126        60
OIR    2025130    131400   -9.7600 -138.2700      25.3       329       127        60
OIR    2025130    131400   -9.7600 -138.2800      25.1       329       128        60
OIR    2025130    131400   -9.7600 -138.2900      25.0       329       130        60
OIR    2025130    131400   -9.7600 -138.3000      24.9       328       131        60
OIR    2025130    131400   -9.7600 -138.3100      24.7       328       131        60
OIR    2025130    131400   -9.7600 -138.3200      24.6       328       133        60
OIR    2025130    131400   -9.7600 -138.3300      24.6       328       136        60
OIR    2025130    131400   -9.7600 -138.3400      24.5       329       136        60
OIR    2025130    131400   -9.7600 -138.3500      24.5       329       135        60
OIR    2025130    131400   -9.7600 -138.3600      24.4       329       137        60
OIR    2025130    131400   -9.7600 -138.3700      24.3       329       139        60
OIR    2025130    131400   -9.7600 -138.3800      24.2       328       142        60
OIR    2025130    131400   -9.7600 -138.3900      24.0       328       145        60
OIR    2025130    131400   -9.7600 -138.4000      23.7       329       147        60
OIR    2025130    131400   -9.7700 -136.0600      39.6        68       150        60
OIR    2025130    131400   -9.7700 -136.1600      43.4        76       147        60
OIR    2025130    131400   -9.7700 -136.1700      43.5        77       141        60
OIR    2025130    131400   -9.7700 -136.1800      43.6        77       142        60
OIR    2025130    131400   -9.7700 -136.1900      43.6        77       143        60
OIR    2025130    131400   -9.7700 -136.2000      43.6        77       146        60
OIR    2025130    131400   -9.7700 -136.2100      43.7        77       147        60
OIR    2025130    131400   -9.7700 -136.2200      43.5        76       145        60
OIR    2025130    131400   -9.7700 -136.2300      43.2        76       139        60
OIR    2025130    131400   -9.7700 -136.2400      42.8        77       129        60
OIR    2025130    131400   -9.7700 -136.2500      43.2        77       127        60
OIR    2025130    131400   -9.7700 -136.2600      43.4        77       126        60
OIR    2025130    131400   -9.7700 -136.2700      43.3        78       129        60
OIR    2025130    131400   -9.7700 -136.2800      43.1        78       133        60
OIR    2025130    131400   -9.7700 -136.2900      41.1        77       140        60
OIR    2025130    131400   -9.7700 -136.3300      35.5        66       146        60
OIR    2025130    131400   -9.7700 -136.3400      35.7        65       140        60
OIR    2025130    131400   -9.7700 -136.3500      36.2        66       136        60
OIR    2025130    131400   -9.7700 -136.3600      37.8        68       134        60
OIR    2025130    131400   -9.7700 -136.3700      38.8        69       133        60
OIR    2025130    131400   -9.7700 -136.3800      39.0        69       134        60
OIR    2025130    131400   -9.7700 -136.3900      39.0        69       136        60
OIR    2025130    131400   -9.7700 -136.4000      39.0        69       135        60
OIR    2025130    131400   -9.7700 -136.4100      39.1        69       134        60
OIR    2025130    131400   -9.7700 -136.4200      39.0        69       136        60
OIR    2025130    131400   -9.7700 -136.4300      39.0        69       139        60
OIR    2025130    131400   -9.7700 -136.4400      39.0        69       142        60
OIR    2025130    131400   -9.7700 -136.4500      38.8        69       141        60
OIR    2025130    131400   -9.7700 -136.4600      38.0        69       138        60
OIR    2025130    131400   -9.7700 -136.4700      37.4        69       136        60
OIR    2025130    131400   -9.7700 -136.4800      37.1        69       134        60
OIR    2025130    131400   -9.7700 -136.4900      36.1        69       129        60
OIR    2025130    131400   -9.7700 -136.5000      34.7        68       124        60
OIR    2025130    131400   -9.7700 -136.5100      33.5        66       123        60
OIR    2025130    131400   -9.7700 -136.5200      32.7        65       122        60
OIR    2025130    131400   -9.7700 -136.5300      32.6        64       122        60
OIR    2025130    131400   -9.7700 -136.5400      32.8        64       125        60
OIR    2025130    131400   -9.7700 -136.5500      33.0        64       131        60
OIR    2025130    131400   -9.7700 -136.5600      33.2        64       133        60
OIR    2025130    131400   -9.7700 -136.5700      33.5        66       133        60
OIR    2025130    131400   -9.7700 -136.5800      34.1        71       132        60
OIR    2025130    131400   -9.7700 -136.5900      35.2        73       130        60
OIR    2025130    131400   -9.7700 -136.6000      36.4        76       131        60
OIR    2025130    131400   -9.7700 -136.6100      36.0        77       132        60
OIR    2025130    131400   -9.7700 -136.6200      35.3        76       134        60
OIR    2025130    131400   -9.7700 -136.6300      33.6        73       136        60
OIR    2025130    131400   -9.7700 -136.6400      32.9        70       137        60
OIR    2025130    131400   -9.7700 -136.6500      33.0        68       135        60
OIR    2025130    131400   -9.7700 -136.6600      33.0        68       125        60
OIR    2025130    131400   -9.7700 -136.6700      33.3        68       122        60
OIR    2025130    131400   -9.7700 -136.6800      33.5        69       123        60
OIR    2025130    131400   -9.7700 -136.6900      33.4        69       125        60
OIR    2025130    131400   -9.7700 -136.7000      33.0        69       130        60
OIR    2025130    131400   -9.7700 -136.7100      32.6        68       136        60
OIR    2025130    131400   -9.7700 -136.7200      31.8        67       141        60
OIR    2025130    131400   -9.7700 -136.7300      30.0        66       142        60
OIR    2025130    131400   -9.7700 -136.7400      23.3        59       143        60
OIR    2025130    131400   -9.7700 -136.7500      17.6        45       141        60
OIR    2025130    131400   -9.7700 -136.7600      18.1        46       136        60
OIR    2025130    131400   -9.7700 -136.7700      18.2        45       126        60
OIR    2025130    131400   -9.7700 -136.7800      24.4        51       120        60
OIR    2025130    131400   -9.7700 -136.7900      26.4        52       116        60
OIR    2025130    131400   -9.7700 -136.8000      27.5        52       115        60
OIR    2025130    131400   -9.7700 -136.8100      28.1        52       115        60
OIR    2025130    131400   -9.7700 -136.8200      28.5        52       113        60
OIR    2025130    131400   -9.7700 -136.8300      28.7        52       110        60
OIR    2025130    131400   -9.7700 -136.8400      28.8        52       108        60
OIR    2025130    131400   -9.7700 -136.8500      28.9        51       105        60
OIR    2025130    131400   -9.7700 -136.8600      28.9        51       104        60
OIR    2025130    131400   -9.7700 -136.8700      28.9        51       103        60
OIR    2025130    131400   -9.7700 -136.8800      28.9        50       103        60
OIR    2025130    131400   -9.7700 -136.8900      28.9        50       103        60
OIR    2025130    131400   -9.7700 -136.9000      28.9        50       103        60
OIR    2025130    131400   -9.7700 -136.9100      28.9        49       103        60
OIR    2025130    131400   -9.7700 -136.9200      29.0        49       103        60
OIR    2025130    131400   -9.7700 -136.9300      29.1        49       103        60
OIR    2025130    131400   -9.7700 -136.9400      29.2        48       103        60
OIR    2025130    131400   -9.7700 -136.9500      29.2        48       103        60
OIR    2025130    131400   -9.7700 -136.9600      29.4        47       103        60
OIR    2025130    131400   -9.7700 -136.9700      29.5        47       103        60
OIR    2025130    131400   -9.7700 -136.9800      29.6        46       103        60
OIR    2025130    131400   -9.7700 -136.9900      29.8        46       103        60
OIR    2025130    131400   -9.7700 -137.0000      30.0        45       104        60
OIR    2025130    131400   -9.7700 -137.0100      30.1        45       105        60
OIR    2025130    131400   -9.7700 -137.0200      30.2        45       107        60
OIR    2025130    131400   -9.7700 -137.0300      30.4        44       107        60
OIR    2025130    131400   -9.7700 -137.0400      30.5        44       104        60
OIR    2025130    131400   -9.7700 -137.0500      30.7        44       104        60
OIR    2025130    131400   -9.7700 -137.0600      30.8        44       103        60
OIR    2025130    131400   -9.7700 -137.0700      30.9        44       103        60
OIR    2025130    131400   -9.7700 -137.0800      31.2        44       103        60
OIR    2025130    131400   -9.7700 -137.0900      31.3        44       103        60
OIR    2025130    131400   -9.7700 -137.1000      31.6        45       103        60
OIR    2025130    131400   -9.7700 -137.1100      31.8        45       103        60
OIR    2025130    131400   -9.7700 -137.1200      31.9        45       103        60
OIR    2025130    131400   -9.7700 -137.1300      32.0        45       103        60
OIR    2025130    131400   -9.7700 -137.1400      32.1        46       103        60
OIR    2025130    131400   -9.7700 -137.1500      32.2        46       103        60
OIR    2025130    131400   -9.7700 -137.1600      32.2        46       103        60
OIR    2025130    131400   -9.7700 -137.1700      32.3        46       103        60
OIR    2025130    131400   -9.7700 -137.1800      32.5        46       103        60
OIR    2025130    131400   -9.7700 -137.1900      32.6        47       103        60
OIR    2025130    131400   -9.7700 -137.2000      33.1        48       103        60
OIR    2025130    131400   -9.7700 -137.2100      33.5        48       103        60
OIR    2025130    131400   -9.7700 -137.2200      34.0        49       103        60
OIR    2025130    131400   -9.7700 -137.2300      34.9        50       104        60
OIR    2025130    131400   -9.7700 -137.2400      35.3        50       104        60
OIR    2025130    131400   -9.7700 -137.2500      35.4        50       103        60
OIR    2025130    131400   -9.7700 -137.2600      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.2700      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.2800      35.6        50       103        60
OIR    2025130    131400   -9.7700 -137.2900      35.6        50       103        60
OIR    2025130    131400   -9.7700 -137.3000      35.6        50       103        60
OIR    2025130    131400   -9.7700 -137.3100      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.3200      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.3300      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.3400      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.3500      35.5        50       103        60
OIR    2025130    131400   -9.7700 -137.3600      35.4        50       103        60
OIR    2025130    131400   -9.7700 -137.3700      35.2        50       103        60
OIR    2025130    131400   -9.7700 -137.3800      35.0        50       103        60
OIR    2025130    131400   -9.7700 -137.3900      34.7        50       103        60
OIR    2025130    131400   -9.7700 -137.4000      34.2        50       103        60
OIR    2025130    131400   -9.7700 -137.4100      33.4        51       103        60
OIR    2025130    131400   -9.7700 -137.4200      32.4        51       103        60
OIR    2025130    131400   -9.7700 -137.4300      31.6        52       103        60
OIR    2025130    131400   -9.7700 -137.4400      31.1        52       103        60
OIR    2025130    131400   -9.7700 -137.4500      30.8        52       103        60
OIR    2025130    131400   -9.7700 -137.4600      30.7        51       103        60
OIR    2025130    131400   -9.7700 -137.4700      30.6        51       103        60
OIR    2025130    131400   -9.7700 -137.4800      30.5        50       103        60
OIR    2025130    131400   -9.7700 -137.4900      30.2        50       103        60
OIR    2025130    131400   -9.7700 -137.5000      29.8        50       103        60
OIR    2025130    131400   -9.7700 -137.5100      29.5        50       103        60
OIR    2025130    131400   -9.7700 -137.5200      29.2        50       103        60
OIR    2025130    131400   -9.7700 -137.5300      28.8        49       103        60
OIR    2025130    131400   -9.7700 -137.5400      28.2        48       103        60
OIR    2025130    131400   -9.7700 -137.5500      27.7        46       103        60
OIR    2025130    131400   -9.7700 -137.5600      27.3        43       103        60
OIR    2025130    131400   -9.7700 -137.5700      26.7        40       103        60
OIR    2025130    131400   -9.7700 -137.5800      26.3        35       103        60
OIR    2025130    131400   -9.7700 -137.5900      26.3        30       104        60
OIR    2025130    131400   -9.7700 -137.6000      27.2        24       104        60
OIR    2025130    131400   -9.7700 -137.6100      29.3        19       105        60
OIR    2025130    131400   -9.7700 -137.6200      32.0        17       107        60
OIR    2025130    131400   -9.7700 -137.6300      34.4        13       104        60
OIR    2025130    131400   -9.7700 -137.6400      35.4        13       103        60
OIR    2025130    131400   -9.7700 -137.6500      35.7        12       103        60
OIR    2025130    131400   -9.7700 -137.6600      35.8        12       103        60
OIR    2025130    131400   -9.7700 -137.6700      35.9        11       103        60
OIR    2025130    131400   -9.7700 -137.6800      36.0        11       104        60
OIR    2025130    131400   -9.7700 -137.6900      36.1        10       104        60
OIR    2025130    131400   -9.7700 -137.7000      36.1         9       104        60
OIR    2025130    131400   -9.7700 -137.7100      36.1         8       103        60
OIR    2025130    131400   -9.7700 -137.7200      35.9         8       103        60
OIR    2025130    131400   -9.7700 -137.7300      35.7         6       103        60
OIR    2025130    131400   -9.7700 -137.7400      35.4         5       103        60
OIR    2025130    131400   -9.7700 -137.7500      35.1         3       103        60
OIR    2025130    131400   -9.7700 -137.7600      34.8         0       103        60
OIR    2025130    131400   -9.7700 -137.7700      34.7       359       103        60
OIR    2025130    131400   -9.7700 -137.7800      34.5       358       103        60
OIR    2025130    131400   -9.7700 -137.7900      34.3       357       103        60
OIR    2025130    131400   -9.7700 -137.8000      34.1       357       103        60
OIR    2025130    131400   -9.7700 -137.8100      34.0       356       103        60
OIR    2025130    131400   -9.7700 -137.8200      33.8       356       103        60
OIR    2025130    131400   -9.7700 -137.8300      33.7       355       103        60
OIR    2025130    131400   -9.7700 -137.8400      33.5       355       103        60
OIR    2025130    131400   -9.7700 -137.8500      33.4       354       103        60
OIR    2025130    131400   -9.7700 -137.8600      33.3       354       103        60
OIR    2025130    131400   -9.7700 -137.8700      33.1       354       103        60
OIR    2025130    131400   -9.7700 -137.8800      33.1       353       103        60
OIR    2025130    131400   -9.7700 -137.8900      33.0       353       103        60
OIR    2025130    131400   -9.7700 -137.9000      33.0       353       103        60
OIR    2025130    131400   -9.7700 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.7700 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7700 -137.9300      32.7       353       103        60
OIR    2025130    131400   -9.7700 -137.9400      32.4       352       103        60
OIR    2025130    131400   -9.7700 -137.9500      32.1       352       103        60
OIR    2025130    131400   -9.7700 -137.9600      31.8       351       103        60
OIR    2025130    131400   -9.7700 -137.9700      31.5       350       103        60
OIR    2025130    131400   -9.7700 -137.9800      31.3       350       103        60
OIR    2025130    131400   -9.7700 -137.9900      31.2       350       104        60
OIR    2025130    131400   -9.7700 -138.0000      31.1       350       105        60
OIR    2025130    131400   -9.7700 -138.0100      31.0       350       109        60
OIR    2025130    131400   -9.7700 -138.0200      30.9       350       113        60
OIR    2025130    131400   -9.7700 -138.0300      30.7       349       114        60
OIR    2025130    131400   -9.7700 -138.0400      30.1       349       116        60
OIR    2025130    131400   -9.7700 -138.0500      28.9       349       119        60
OIR    2025130    131400   -9.7700 -138.0600      27.1       348       123        60
OIR    2025130    131400   -9.7700 -138.0700      26.2       346       128        60
OIR    2025130    131400   -9.7700 -138.0800      26.2       344       131        60
OIR    2025130    131400   -9.7700 -138.0900      26.8       339       133        60
OIR    2025130    131400   -9.7700 -138.1000      28.1       332       134        60
OIR    2025130    131400   -9.7700 -138.1100      28.6       329       136        60
OIR    2025130    131400   -9.7700 -138.1200      28.6       328       138        60
OIR    2025130    131400   -9.7700 -138.1300      28.6       328       141        60
OIR    2025130    131400   -9.7700 -138.1400      28.6       327       142        60
OIR    2025130    131400   -9.7700 -138.1500      28.6       327       143        60
OIR    2025130    131400   -9.7700 -138.1600      28.6       327       144        60
OIR    2025130    131400   -9.7700 -138.1700      28.6       327       143        60
OIR    2025130    131400   -9.7700 -138.1800      28.6       327       138        60
OIR    2025130    131400   -9.7700 -138.1900      28.6       327       133        60
OIR    2025130    131400   -9.7700 -138.2000      28.5       327       128        60
OIR    2025130    131400   -9.7700 -138.2100      28.4       327       124        60
OIR    2025130    131400   -9.7700 -138.2200      28.0       327       120        60
OIR    2025130    131400   -9.7700 -138.2300      27.1       328       120        60
OIR    2025130    131400   -9.7700 -138.2400      26.2       328       120        60
OIR    2025130    131400   -9.7700 -138.2500      25.7       329       122        60
OIR    2025130    131400   -9.7700 -138.2600      25.4       329       123        60
OIR    2025130    131400   -9.7700 -138.2700      25.3       329       124        60
OIR    2025130    131400   -9.7700 -138.2800      25.2       329       126        60
OIR    2025130    131400   -9.7700 -138.2900      25.2       329       129        60
OIR    2025130    131400   -9.7700 -138.3000      25.1       329       131        60
OIR    2025130    131400   -9.7700 -138.3100      24.9       328       132        60
OIR    2025130    131400   -9.7700 -138.3200      24.9       328       133        60
OIR    2025130    131400   -9.7700 -138.3300      24.8       328       136        60
OIR    2025130    131400   -9.7700 -138.3400      24.7       328       136        60
OIR    2025130    131400   -9.7700 -138.3500      24.7       328       135        60
OIR    2025130    131400   -9.7700 -138.3600      24.7       329       138        60
OIR    2025130    131400   -9.7700 -138.3700      24.6       328       140        60
OIR    2025130    131400   -9.7700 -138.3800      24.7       328       143        60
OIR    2025130    131400   -9.7700 -138.3900      24.7       328       146        60
OIR    2025130    131400   -9.7800 -136.0500      39.5        66       147        60
OIR    2025130    131400   -9.7800 -136.0600      39.3        66       145        60
OIR    2025130    131400   -9.7800 -136.1300      42.7        75       149        60
OIR    2025130    131400   -9.7800 -136.1600      43.2        76       149        60
OIR    2025130    131400   -9.7800 -136.1700      43.4        76       143        60
OIR    2025130    131400   -9.7800 -136.1800      43.5        76       143        60
OIR    2025130    131400   -9.7800 -136.1900      43.6        76       145        60
OIR    2025130    131400   -9.7800 -136.2300      42.9        66       147        60
OIR    2025130    131400   -9.7800 -136.2400      42.8        66       139        60
OIR    2025130    131400   -9.7800 -136.2500      43.1        68       136        60
OIR    2025130    131400   -9.7800 -136.2600      43.4        72       134        60
OIR    2025130    131400   -9.7800 -136.2700      43.1        73       136        60
OIR    2025130    131400   -9.7800 -136.2800      42.2        72       140        60
OIR    2025130    131400   -9.7800 -136.3300      35.2        64       143        60
OIR    2025130    131400   -9.7800 -136.3400      35.6        64       138        60
OIR    2025130    131400   -9.7800 -136.3500      36.2        65       135        60
OIR    2025130    131400   -9.7800 -136.3600      38.3        68       135        60
OIR    2025130    131400   -9.7800 -136.3700      38.9        69       134        60
OIR    2025130    131400   -9.7800 -136.3800      39.0        69       137        60
OIR    2025130    131400   -9.7800 -136.3900      39.0        69       140        60
OIR    2025130    131400   -9.7800 -136.4000      39.0        69       139        60
OIR    2025130    131400   -9.7800 -136.4100      39.0        69       138        60
OIR    2025130    131400   -9.7800 -136.4200      39.0        69       137        60
OIR    2025130    131400   -9.7800 -136.4300      39.0        69       138        60
OIR    2025130    131400   -9.7800 -136.4400      38.9        69       141        60
OIR    2025130    131400   -9.7800 -136.4500      38.6        68       140        60
OIR    2025130    131400   -9.7800 -136.4600      38.0        68       137        60
OIR    2025130    131400   -9.7800 -136.4700      37.8        67       135        60
OIR    2025130    131400   -9.7800 -136.4800      37.4        67       133        60
OIR    2025130    131400   -9.7800 -136.4900      36.8        67       131        60
OIR    2025130    131400   -9.7800 -136.5000      35.9        66       128        60
OIR    2025130    131400   -9.7800 -136.5100      35.0        65       128        60
OIR    2025130    131400   -9.7800 -136.5200      33.9        64       127        60
OIR    2025130    131400   -9.7800 -136.5300      33.5        63       128        60
OIR    2025130    131400   -9.7800 -136.5400      33.4        63       131        60
OIR    2025130    131400   -9.7800 -136.5500      33.4        63       135        60
OIR    2025130    131400   -9.7800 -136.5600      33.6        64       135        60
OIR    2025130    131400   -9.7800 -136.5700      34.1        64       133        60
OIR    2025130    131400   -9.7800 -136.5800      34.6        65       132        60
OIR    2025130    131400   -9.7800 -136.5900      34.8        65       131        60
OIR    2025130    131400   -9.7800 -136.6000      35.0        66       130        60
OIR    2025130    131400   -9.7800 -136.6100      34.7        66       130        60
OIR    2025130    131400   -9.7800 -136.6200      34.4        67       132        60
OIR    2025130    131400   -9.7800 -136.6300      33.8        67       133        60
OIR    2025130    131400   -9.7800 -136.6400      33.3        67       135        60
OIR    2025130    131400   -9.7800 -136.6500      33.3        67       134        60
OIR    2025130    131400   -9.7800 -136.6600      33.4        67       126        60
OIR    2025130    131400   -9.7800 -136.6700      33.5        68       124        60
OIR    2025130    131400   -9.7800 -136.6800      33.6        68       124        60
OIR    2025130    131400   -9.7800 -136.6900      33.6        68       126        60
OIR    2025130    131400   -9.7800 -136.7000      33.5        67       130        60
OIR    2025130    131400   -9.7800 -136.7100      33.1        66       134        60
OIR    2025130    131400   -9.7800 -136.7200      32.4        65       138        60
OIR    2025130    131400   -9.7800 -136.7300      30.9        63       141        60
OIR    2025130    131400   -9.7800 -136.7400      26.4        59       144        60
OIR    2025130    131400   -9.7800 -136.7500      18.3        45       143        60
OIR    2025130    131400   -9.7800 -136.7600      18.7        46       139        60
OIR    2025130    131400   -9.7800 -136.7700      19.3        45       129        60
OIR    2025130    131400   -9.7800 -136.7800      25.6        51       123        60
OIR    2025130    131400   -9.7800 -136.7900      27.2        51       116        60
OIR    2025130    131400   -9.7800 -136.8000      28.2        52       115        60
OIR    2025130    131400   -9.7800 -136.8100      28.6        51       116        60
OIR    2025130    131400   -9.7800 -136.8200      28.9        51       113        60
OIR    2025130    131400   -9.7800 -136.8300      29.0        51       110        60
OIR    2025130    131400   -9.7800 -136.8400      29.1        51       108        60
OIR    2025130    131400   -9.7800 -136.8500      29.2        50       105        60
OIR    2025130    131400   -9.7800 -136.8600      29.2        50       104        60
OIR    2025130    131400   -9.7800 -136.8700      29.1        50       103        60
OIR    2025130    131400   -9.7800 -136.8800      29.1        50       103        60
OIR    2025130    131400   -9.7800 -136.8900      29.1        50       103        60
OIR    2025130    131400   -9.7800 -136.9000      29.1        49       103        60
OIR    2025130    131400   -9.7800 -136.9100      29.1        49       103        60
OIR    2025130    131400   -9.7800 -136.9200      29.1        49       103        60
OIR    2025130    131400   -9.7800 -136.9300      29.2        48       103        60
OIR    2025130    131400   -9.7800 -136.9400      29.3        48       103        60
OIR    2025130    131400   -9.7800 -136.9500      29.3        47       103        60
OIR    2025130    131400   -9.7800 -136.9600      29.4        47       103        60
OIR    2025130    131400   -9.7800 -136.9700      29.5        46       103        60
OIR    2025130    131400   -9.7800 -136.9800      29.7        46       103        60
OIR    2025130    131400   -9.7800 -136.9900      29.9        45       104        60
OIR    2025130    131400   -9.7800 -137.0000      30.0        45       104        60
OIR    2025130    131400   -9.7800 -137.0100      30.1        45       107        60
OIR    2025130    131400   -9.7800 -137.0200      30.2        44       107        60
OIR    2025130    131400   -9.7800 -137.0300      30.4        44       107        60
OIR    2025130    131400   -9.7800 -137.0400      30.5        44       104        60
OIR    2025130    131400   -9.7800 -137.0500      30.6        44       104        60
OIR    2025130    131400   -9.7800 -137.0600      30.7        44       104        60
OIR    2025130    131400   -9.7800 -137.0700      30.9        44       104        60
OIR    2025130    131400   -9.7800 -137.0800      31.0        44       103        60
OIR    2025130    131400   -9.7800 -137.0900      31.3        44       103        60
OIR    2025130    131400   -9.7800 -137.1000      31.5        44       103        60
OIR    2025130    131400   -9.7800 -137.1100      31.7        45       103        60
OIR    2025130    131400   -9.7800 -137.1200      31.9        45       103        60
OIR    2025130    131400   -9.7800 -137.1300      32.0        45       103        60
OIR    2025130    131400   -9.7800 -137.1400      32.1        45       103        60
OIR    2025130    131400   -9.7800 -137.1500      32.1        45       103        60
OIR    2025130    131400   -9.7800 -137.1600      32.2        46       103        60
OIR    2025130    131400   -9.7800 -137.1700      32.2        46       103        60
OIR    2025130    131400   -9.7800 -137.1800      32.2        46       103        60
OIR    2025130    131400   -9.7800 -137.1900      32.4        46       103        60
OIR    2025130    131400   -9.7800 -137.2000      32.9        47       103        60
OIR    2025130    131400   -9.7800 -137.2100      33.3        47       103        60
OIR    2025130    131400   -9.7800 -137.2200      34.0        48       104        60
OIR    2025130    131400   -9.7800 -137.2300      35.2        49       104        60
OIR    2025130    131400   -9.7800 -137.2400      35.5        50       104        60
OIR    2025130    131400   -9.7800 -137.2500      35.6        50       103        60
OIR    2025130    131400   -9.7800 -137.2600      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.2700      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.2800      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.2900      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.3000      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.3100      35.6        50       103        60
OIR    2025130    131400   -9.7800 -137.3200      35.6        50       103        60
OIR    2025130    131400   -9.7800 -137.3300      35.6        50       103        60
OIR    2025130    131400   -9.7800 -137.3400      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.3500      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.3600      35.7        50       103        60
OIR    2025130    131400   -9.7800 -137.3700      35.5        50       103        60
OIR    2025130    131400   -9.7800 -137.3800      35.3        50       103        60
OIR    2025130    131400   -9.7800 -137.3900      35.0        50       103        60
OIR    2025130    131400   -9.7800 -137.4000      34.6        50       103        60
OIR    2025130    131400   -9.7800 -137.4100      34.0        50       103        60
OIR    2025130    131400   -9.7800 -137.4200      33.1        50       103        60
OIR    2025130    131400   -9.7800 -137.4300      32.2        50       103        60
OIR    2025130    131400   -9.7800 -137.4400      31.5        50       103        60
OIR    2025130    131400   -9.7800 -137.4500      31.1        50       103        60
OIR    2025130    131400   -9.7800 -137.4600      30.8        50       103        60
OIR    2025130    131400   -9.7800 -137.4700      30.6        50       103        60
OIR    2025130    131400   -9.7800 -137.4800      30.5        49       103        60
OIR    2025130    131400   -9.7800 -137.4900      30.3        49       103        60
OIR    2025130    131400   -9.7800 -137.5000      30.0        49       103        60
OIR    2025130    131400   -9.7800 -137.5100      29.7        49       103        60
OIR    2025130    131400   -9.7800 -137.5200      29.5        48       103        60
OIR    2025130    131400   -9.7800 -137.5300      29.2        48       103        60
OIR    2025130    131400   -9.7800 -137.5400      28.8        45       103        60
OIR    2025130    131400   -9.7800 -137.5500      28.5        42       103        60
OIR    2025130    131400   -9.7800 -137.5600      28.6        39       103        60
OIR    2025130    131400   -9.7800 -137.5700      29.0        34       103        60
OIR    2025130    131400   -9.7800 -137.5800      29.2        29       103        60
OIR    2025130    131400   -9.7800 -137.5900      30.2        23       103        60
OIR    2025130    131400   -9.7800 -137.6000      32.0        18       103        60
OIR    2025130    131400   -9.7800 -137.6100      33.6        15       104        60
OIR    2025130    131400   -9.7800 -137.6200      34.9        14       104        60
OIR    2025130    131400   -9.7800 -137.6300      35.4        13       104        60
OIR    2025130    131400   -9.7800 -137.6400      35.6        13       103        60
OIR    2025130    131400   -9.7800 -137.6500      35.9        12       103        60
OIR    2025130    131400   -9.7800 -137.6600      36.0        12       103        60
OIR    2025130    131400   -9.7800 -137.6700      36.1        11       103        60
OIR    2025130    131400   -9.7800 -137.6800      36.2        11       103        60
OIR    2025130    131400   -9.7800 -137.6900      36.3        10       103        60
OIR    2025130    131400   -9.7800 -137.7000      36.4         9       103        60
OIR    2025130    131400   -9.7800 -137.7100      36.5         8       103        60
OIR    2025130    131400   -9.7800 -137.7200      36.4         8       103        60
OIR    2025130    131400   -9.7800 -137.7300      36.2         6       103        60
OIR    2025130    131400   -9.7800 -137.7400      35.9         5       103        60
OIR    2025130    131400   -9.7800 -137.7500      35.5         3       103        60
OIR    2025130    131400   -9.7800 -137.7600      35.2         0       103        60
OIR    2025130    131400   -9.7800 -137.7700      35.0       359       103        60
OIR    2025130    131400   -9.7800 -137.7800      34.7       358       103        60
OIR    2025130    131400   -9.7800 -137.7900      34.5       358       103        60
OIR    2025130    131400   -9.7800 -137.8000      34.3       357       103        60
OIR    2025130    131400   -9.7800 -137.8100      34.2       357       103        60
OIR    2025130    131400   -9.7800 -137.8200      34.0       356       103        60
OIR    2025130    131400   -9.7800 -137.8300      33.8       355       103        60
OIR    2025130    131400   -9.7800 -137.8400      33.6       355       103        60
OIR    2025130    131400   -9.7800 -137.8500      33.5       354       103        60
OIR    2025130    131400   -9.7800 -137.8600      33.4       354       103        60
OIR    2025130    131400   -9.7800 -137.8700      33.2       354       103        60
OIR    2025130    131400   -9.7800 -137.8800      33.1       353       103        60
OIR    2025130    131400   -9.7800 -137.8900      33.1       353       103        60
OIR    2025130    131400   -9.7800 -137.9000      33.0       353       103        60
OIR    2025130    131400   -9.7800 -137.9100      33.0       353       103        60
OIR    2025130    131400   -9.7800 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7800 -137.9300      32.7       353       103        60
OIR    2025130    131400   -9.7800 -137.9400      32.4       352       103        60
OIR    2025130    131400   -9.7800 -137.9500      32.1       352       103        60
OIR    2025130    131400   -9.7800 -137.9600      31.7       351       103        60
OIR    2025130    131400   -9.7800 -137.9700      31.5       350       103        60
OIR    2025130    131400   -9.7800 -137.9800      31.4       350       103        60
OIR    2025130    131400   -9.7800 -137.9900      31.2       350       104        60
OIR    2025130    131400   -9.7800 -138.0000      31.2       350       107        60
OIR    2025130    131400   -9.7800 -138.0100      31.1       350       111        60
OIR    2025130    131400   -9.7800 -138.0200      31.0       350       115        60
OIR    2025130    131400   -9.7800 -138.0300      30.9       349       116        60
OIR    2025130    131400   -9.7800 -138.0400      30.8       349       119        60
OIR    2025130    131400   -9.7800 -138.0500      30.4       349       121        60
OIR    2025130    131400   -9.7800 -138.0600      29.5       348       124        60
OIR    2025130    131400   -9.7800 -138.0700      28.4       346       127        60
OIR    2025130    131400   -9.7800 -138.0800      27.8       343       129        60
OIR    2025130    131400   -9.7800 -138.0900      28.0       338       131        60
OIR    2025130    131400   -9.7800 -138.1000      28.6       332       133        60
OIR    2025130    131400   -9.7800 -138.1100      28.7       329       135        60
OIR    2025130    131400   -9.7800 -138.1200      28.7       329       138        60
OIR    2025130    131400   -9.7800 -138.1300      28.7       328       141        60
OIR    2025130    131400   -9.7800 -138.1400      28.7       327       143        60
OIR    2025130    131400   -9.7800 -138.1500      28.8       327       145        60
OIR    2025130    131400   -9.7800 -138.1600      28.7       327       145        60
OIR    2025130    131400   -9.7800 -138.1700      28.7       327       144        60
OIR    2025130    131400   -9.7800 -138.1800      28.6       327       136        60
OIR    2025130    131400   -9.7800 -138.1900      28.6       327       129        60
OIR    2025130    131400   -9.7800 -138.2000      28.6       327       125        60
OIR    2025130    131400   -9.7800 -138.2100      28.5       327       121        60
OIR    2025130    131400   -9.7800 -138.2200      28.0       327       116        60
OIR    2025130    131400   -9.7800 -138.2300      27.0       328       116        60
OIR    2025130    131400   -9.7800 -138.2400      26.2       328       117        60
OIR    2025130    131400   -9.7800 -138.2500      25.7       328       119        60
OIR    2025130    131400   -9.7800 -138.2600      25.4       329       120        60
OIR    2025130    131400   -9.7800 -138.2700      25.3       329       122        60
OIR    2025130    131400   -9.7800 -138.2800      25.3       329       124        60
OIR    2025130    131400   -9.7800 -138.2900      25.2       329       128        60
OIR    2025130    131400   -9.7800 -138.3000      25.2       328       130        60
OIR    2025130    131400   -9.7800 -138.3100      25.1       328       132        60
OIR    2025130    131400   -9.7800 -138.3200      25.1       328       134        60
OIR    2025130    131400   -9.7800 -138.3300      25.0       328       135        60
OIR    2025130    131400   -9.7800 -138.3400      25.0       328       135        60
OIR    2025130    131400   -9.7800 -138.3500      24.9       328       135        60
OIR    2025130    131400   -9.7800 -138.3600      24.9       328       138        60
OIR    2025130    131400   -9.7800 -138.3700      24.9       328       142        60
OIR    2025130    131400   -9.7800 -138.3800      25.0       328       144        60
OIR    2025130    131400   -9.7800 -138.3900      25.0       328       147        60
OIR    2025130    131400   -9.7900 -136.0200      39.6        67       148        60
OIR    2025130    131400   -9.7900 -136.0300      39.5        66       149        60
OIR    2025130    131400   -9.7900 -136.0500      39.4        66       147        60
OIR    2025130    131400   -9.7900 -136.0600      39.3        66       145        60
OIR    2025130    131400   -9.7900 -136.0700      39.2        66       148        60
OIR    2025130    131400   -9.7900 -136.1700      43.1        73       146        60
OIR    2025130    131400   -9.7900 -136.1800      43.0        73       146        60
OIR    2025130    131400   -9.7900 -136.1900      42.9        73       148        60
OIR    2025130    131400   -9.7900 -136.2400      42.2        65       143        60
OIR    2025130    131400   -9.7900 -136.2500      42.2        66       140        60
OIR    2025130    131400   -9.7900 -136.2600      42.8        70       137        60
OIR    2025130    131400   -9.7900 -136.2700      42.6        71       140        60
OIR    2025130    131400   -9.7900 -136.2800      40.6        69       146        60
OIR    2025130    131400   -9.7900 -136.3300      35.2        63       142        60
OIR    2025130    131400   -9.7900 -136.3400      35.8        64       137        60
OIR    2025130    131400   -9.7900 -136.3500      36.7        66       135        60
OIR    2025130    131400   -9.7900 -136.3600      38.8        68       136        60
OIR    2025130    131400   -9.7900 -136.3700      39.0        69       138        60
OIR    2025130    131400   -9.7900 -136.3800      39.0        69       140        60
OIR    2025130    131400   -9.7900 -136.3900      39.0        69       142        60
OIR    2025130    131400   -9.7900 -136.4000      39.0        69       140        60
OIR    2025130    131400   -9.7900 -136.4100      39.0        69       138        60
OIR    2025130    131400   -9.7900 -136.4200      38.9        69       138        60
OIR    2025130    131400   -9.7900 -136.4300      38.9        69       139        60
OIR    2025130    131400   -9.7900 -136.4400      38.7        68       140        60
OIR    2025130    131400   -9.7900 -136.4500      38.3        68       138        60
OIR    2025130    131400   -9.7900 -136.4600      38.0        67       135        60
OIR    2025130    131400   -9.7900 -136.4700      37.8        67       134        60
OIR    2025130    131400   -9.7900 -136.4800      37.7        67       134        60
OIR    2025130    131400   -9.7900 -136.4900      37.3        66       133        60
OIR    2025130    131400   -9.7900 -136.5000      36.5        66       131        60
OIR    2025130    131400   -9.7900 -136.5100      35.6        65       131        60
OIR    2025130    131400   -9.7900 -136.5200      34.7        64       131        60
OIR    2025130    131400   -9.7900 -136.5300      34.0        63       132        60
OIR    2025130    131400   -9.7900 -136.5400      33.5        63       133        60
OIR    2025130    131400   -9.7900 -136.5500      33.6        63       135        60
OIR    2025130    131400   -9.7900 -136.5600      33.8        63       134        60
OIR    2025130    131400   -9.7900 -136.5700      34.3        64       131        60
OIR    2025130    131400   -9.7900 -136.5800      34.6        64       129        60
OIR    2025130    131400   -9.7900 -136.5900      34.8        65       129        60
OIR    2025130    131400   -9.7900 -136.6000      34.8        65       129        60
OIR    2025130    131400   -9.7900 -136.6100      34.6        65       128        60
OIR    2025130    131400   -9.7900 -136.6200      34.4        66       129        60
OIR    2025130    131400   -9.7900 -136.6300      33.9        66       131        60
OIR    2025130    131400   -9.7900 -136.6400      33.5        66       132        60
OIR    2025130    131400   -9.7900 -136.6500      33.4        67       131        60
OIR    2025130    131400   -9.7900 -136.6600      33.5        67       126        60
OIR    2025130    131400   -9.7900 -136.6700      33.5        67       125        60
OIR    2025130    131400   -9.7900 -136.6800      33.6        68       126        60
OIR    2025130    131400   -9.7900 -136.6900      33.6        67       127        60
OIR    2025130    131400   -9.7900 -136.7000      33.5        67       131        60
OIR    2025130    131400   -9.7900 -136.7100      33.5        64       136        60
OIR    2025130    131400   -9.7900 -136.7200      33.2        61       142        60
OIR    2025130    131400   -9.7900 -136.7300      32.8        59       145        60
OIR    2025130    131400   -9.7900 -136.7500      22.9        52       145        60
OIR    2025130    131400   -9.7900 -136.7600      21.1        49       139        60
OIR    2025130    131400   -9.7900 -136.7700      22.8        48       130        60
OIR    2025130    131400   -9.7900 -136.7800      27.7        51       123        60
OIR    2025130    131400   -9.7900 -136.7900      28.4        51       117        60
OIR    2025130    131400   -9.7900 -136.8000      28.9        51       116        60
OIR    2025130    131400   -9.7900 -136.8100      29.1        51       116        60
OIR    2025130    131400   -9.7900 -136.8200      29.2        51       114        60
OIR    2025130    131400   -9.7900 -136.8300      29.3        50       111        60
OIR    2025130    131400   -9.7900 -136.8400      29.3        50       109        60
OIR    2025130    131400   -9.7900 -136.8500      29.3        50       107        60
OIR    2025130    131400   -9.7900 -136.8600      29.3        50       104        60
OIR    2025130    131400   -9.7900 -136.8700      29.3        50       104        60
OIR    2025130    131400   -9.7900 -136.8800      29.3        49       104        60
OIR    2025130    131400   -9.7900 -136.8900      29.2        49       103        60
OIR    2025130    131400   -9.7900 -136.9000      29.2        49       103        60
OIR    2025130    131400   -9.7900 -136.9100      29.2        49       103        60
OIR    2025130    131400   -9.7900 -136.9200      29.3        48       103        60
OIR    2025130    131400   -9.7900 -136.9300      29.3        48       103        60
OIR    2025130    131400   -9.7900 -136.9400      29.4        47       103        60
OIR    2025130    131400   -9.7900 -136.9500      29.4        47       103        60
OIR    2025130    131400   -9.7900 -136.9600      29.5        46       103        60
OIR    2025130    131400   -9.7900 -136.9700      29.6        45       104        60
OIR    2025130    131400   -9.7900 -136.9800      29.8        45       104        60
OIR    2025130    131400   -9.7900 -136.9900      29.9        45       104        60
OIR    2025130    131400   -9.7900 -137.0000      30.0        44       104        60
OIR    2025130    131400   -9.7900 -137.0100      30.1        44       107        60
OIR    2025130    131400   -9.7900 -137.0200      30.2        44       107        60
OIR    2025130    131400   -9.7900 -137.0300      30.3        44       108        60
OIR    2025130    131400   -9.7900 -137.0400      30.4        44       104        60
OIR    2025130    131400   -9.7900 -137.0500      30.6        44       104        60
OIR    2025130    131400   -9.7900 -137.0600      30.7        44       104        60
OIR    2025130    131400   -9.7900 -137.0700      30.8        44       104        60
OIR    2025130    131400   -9.7900 -137.0800      30.9        44       103        60
OIR    2025130    131400   -9.7900 -137.0900      31.1        44       103        60
OIR    2025130    131400   -9.7900 -137.1000      31.4        44       103        60
OIR    2025130    131400   -9.7900 -137.1100      31.6        44       103        60
OIR    2025130    131400   -9.7900 -137.1200      31.8        45       103        60
OIR    2025130    131400   -9.7900 -137.1300      32.0        45       103        60
OIR    2025130    131400   -9.7900 -137.1400      32.1        45       103        60
OIR    2025130    131400   -9.7900 -137.1500      32.1        45       103        60
OIR    2025130    131400   -9.7900 -137.1600      32.2        45       103        60
OIR    2025130    131400   -9.7900 -137.1700      32.2        45       103        60
OIR    2025130    131400   -9.7900 -137.1800      32.2        45       103        60
OIR    2025130    131400   -9.7900 -137.1900      32.3        46       103        60
OIR    2025130    131400   -9.7900 -137.2000      32.8        46       103        60
OIR    2025130    131400   -9.7900 -137.2100      33.3        47       103        60
OIR    2025130    131400   -9.7900 -137.2200      34.3        48       104        60
OIR    2025130    131400   -9.7900 -137.2300      35.4        49       104        60
OIR    2025130    131400   -9.7900 -137.2400      35.7        49       104        60
OIR    2025130    131400   -9.7900 -137.2500      35.8        49       103        60
OIR    2025130    131400   -9.7900 -137.2600      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.2700      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.2800      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.2900      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.3000      35.9        50       103        60
OIR    2025130    131400   -9.7900 -137.3100      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.3200      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.3300      35.8        50       103        60
OIR    2025130    131400   -9.7900 -137.3400      35.9        50       103        60
OIR    2025130    131400   -9.7900 -137.3500      35.9        50       103        60
OIR    2025130    131400   -9.7900 -137.3600      35.9        50       103        60
OIR    2025130    131400   -9.7900 -137.3700      35.7        49       103        60
OIR    2025130    131400   -9.7900 -137.3800      35.6        49       103        60
OIR    2025130    131400   -9.7900 -137.3900      35.3        49       103        60
OIR    2025130    131400   -9.7900 -137.4000      34.8        49       103        60
OIR    2025130    131400   -9.7900 -137.4100      34.2        49       103        60
OIR    2025130    131400   -9.7900 -137.4200      33.5        49       103        60
OIR    2025130    131400   -9.7900 -137.4300      32.7        49       103        60
OIR    2025130    131400   -9.7900 -137.4400      32.0        49       103        60
OIR    2025130    131400   -9.7900 -137.4500      31.4        49       103        60
OIR    2025130    131400   -9.7900 -137.4600      31.0        49       103        60
OIR    2025130    131400   -9.7900 -137.4700      30.7        49       103        60
OIR    2025130    131400   -9.7900 -137.4800      30.5        49       103        60
OIR    2025130    131400   -9.7900 -137.4900      30.4        49       103        60
OIR    2025130    131400   -9.7900 -137.5000      30.2        48       103        60
OIR    2025130    131400   -9.7900 -137.5100      29.9        48       103        60
OIR    2025130    131400   -9.7900 -137.5200      29.7        47       103        60
OIR    2025130    131400   -9.7900 -137.5300      29.6        46       103        60
OIR    2025130    131400   -9.7900 -137.5400      29.5        41       103        60
OIR    2025130    131400   -9.7900 -137.5500      29.9        36       103        60
OIR    2025130    131400   -9.7900 -137.5600      30.8        30       103        60
OIR    2025130    131400   -9.7900 -137.5700      32.3        24       103        60
OIR    2025130    131400   -9.7900 -137.5800      33.3        20       103        60
OIR    2025130    131400   -9.7900 -137.5900      34.4        16       103        60
OIR    2025130    131400   -9.7900 -137.6000      35.1        15       103        60
OIR    2025130    131400   -9.7900 -137.6100      35.5        14       103        60
OIR    2025130    131400   -9.7900 -137.6200      35.7        14       104        60
OIR    2025130    131400   -9.7900 -137.6300      35.8        13       103        60
OIR    2025130    131400   -9.7900 -137.6400      35.9        13       103        60
OIR    2025130    131400   -9.7900 -137.6500      36.0        12       103        60
OIR    2025130    131400   -9.7900 -137.6600      36.2        12       103        60
OIR    2025130    131400   -9.7900 -137.6700      36.3        11       104        60
OIR    2025130    131400   -9.7900 -137.6800      36.4        11       104        60
OIR    2025130    131400   -9.7900 -137.6900      36.6        10       103        60
OIR    2025130    131400   -9.7900 -137.7000      36.7         9       104        60
OIR    2025130    131400   -9.7900 -137.7100      36.7         8       104        60
OIR    2025130    131400   -9.7900 -137.7200      36.7         8       104        60
OIR    2025130    131400   -9.7900 -137.7300      36.6         7       103        60
OIR    2025130    131400   -9.7900 -137.7400      36.3         5       103        60
OIR    2025130    131400   -9.7900 -137.7500      35.9         3       103        60
OIR    2025130    131400   -9.7900 -137.7600      35.5         1       103        60
OIR    2025130    131400   -9.7900 -137.7700      35.3       360       103        60
OIR    2025130    131400   -9.7900 -137.7800      34.9       359       103        60
OIR    2025130    131400   -9.7900 -137.7900      34.6       358       103        60
OIR    2025130    131400   -9.7900 -137.8000      34.4       357       103        60
OIR    2025130    131400   -9.7900 -137.8100      34.3       357       103        60
OIR    2025130    131400   -9.7900 -137.8200      34.1       356       103        60
OIR    2025130    131400   -9.7900 -137.8300      33.9       355       103        60
OIR    2025130    131400   -9.7900 -137.8400      33.7       354       103        60
OIR    2025130    131400   -9.7900 -137.8500      33.6       354       103        60
OIR    2025130    131400   -9.7900 -137.8600      33.5       354       103        60
OIR    2025130    131400   -9.7900 -137.8700      33.3       354       103        60
OIR    2025130    131400   -9.7900 -137.8800      33.2       353       103        60
OIR    2025130    131400   -9.7900 -137.8900      33.1       353       103        60
OIR    2025130    131400   -9.7900 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.7900 -137.9100      33.0       353       103        60
OIR    2025130    131400   -9.7900 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.7900 -137.9300      32.6       352       103        60
OIR    2025130    131400   -9.7900 -137.9400      32.3       352       103        60
OIR    2025130    131400   -9.7900 -137.9500      32.0       351       103        60
OIR    2025130    131400   -9.7900 -137.9600      31.7       351       103        60
OIR    2025130    131400   -9.7900 -137.9700      31.5       350       103        60
OIR    2025130    131400   -9.7900 -137.9800      31.4       350       104        60
OIR    2025130    131400   -9.7900 -137.9900      31.3       350       105        60
OIR    2025130    131400   -9.7900 -138.0000      31.2       350       109        60
OIR    2025130    131400   -9.7900 -138.0100      31.1       350       112        60
OIR    2025130    131400   -9.7900 -138.0200      31.1       349       116        60
OIR    2025130    131400   -9.7900 -138.0300      31.0       349       117        60
OIR    2025130    131400   -9.7900 -138.0400      30.9       349       120        60
OIR    2025130    131400   -9.7900 -138.0500      30.7       349       121        60
OIR    2025130    131400   -9.7900 -138.0600      30.0       347       122        60
OIR    2025130    131400   -9.7900 -138.0700      29.5       346       123        60
OIR    2025130    131400   -9.7900 -138.0800      29.1       344       126        60
OIR    2025130    131400   -9.7900 -138.0900      28.9       338       130        60
OIR    2025130    131400   -9.7900 -138.1000      28.9       332       133        60
OIR    2025130    131400   -9.7900 -138.1100      28.9       330       135        60
OIR    2025130    131400   -9.7900 -138.1200      28.8       329       138        60
OIR    2025130    131400   -9.7900 -138.1300      28.8       328       141        60
OIR    2025130    131400   -9.7900 -138.1400      28.9       328       143        60
OIR    2025130    131400   -9.7900 -138.1500      28.8       327       145        60
OIR    2025130    131400   -9.7900 -138.1600      28.8       327       143        60
OIR    2025130    131400   -9.7900 -138.1700      28.8       327       141        60
OIR    2025130    131400   -9.7900 -138.1800      28.7       327       134        60
OIR    2025130    131400   -9.7900 -138.1900      28.7       327       128        60
OIR    2025130    131400   -9.7900 -138.2000      28.6       327       125        60
OIR    2025130    131400   -9.7900 -138.2100      28.5       327       121        60
OIR    2025130    131400   -9.7900 -138.2200      27.8       327       119        60
OIR    2025130    131400   -9.7900 -138.2300      27.0       328       117        60
OIR    2025130    131400   -9.7900 -138.2400      26.2       328       117        60
OIR    2025130    131400   -9.7900 -138.2500      25.6       328       119        60
OIR    2025130    131400   -9.7900 -138.2600      25.4       328       119        60
OIR    2025130    131400   -9.7900 -138.2700      25.4       328       121        60
OIR    2025130    131400   -9.7900 -138.2800      25.3       328       123        60
OIR    2025130    131400   -9.7900 -138.2900      25.3       328       126        60
OIR    2025130    131400   -9.7900 -138.3000      25.2       328       129        60
OIR    2025130    131400   -9.7900 -138.3100      25.2       328       133        60
OIR    2025130    131400   -9.7900 -138.3200      25.2       328       135        60
OIR    2025130    131400   -9.7900 -138.3300      25.1       328       137        60
OIR    2025130    131400   -9.7900 -138.3400      25.1       328       137        60
OIR    2025130    131400   -9.7900 -138.3500      25.1       328       136        60
OIR    2025130    131400   -9.7900 -138.3600      25.1       328       140        60
OIR    2025130    131400   -9.7900 -138.3700      25.1       328       142        60
OIR    2025130    131400   -9.7900 -138.3800      25.1       328       144        60
OIR    2025130    131400   -9.7900 -138.3900      25.2       328       146        60
OIR    2025130    131400   -9.8000 -136.0600      39.2        66       147        60
OIR    2025130    131400   -9.8000 -136.0700      39.1        66       148        60
OIR    2025130    131400   -9.8000 -136.0800      39.1        66       149        60
OIR    2025130    131400   -9.8000 -136.2300      41.9        64       147        60
OIR    2025130    131400   -9.8000 -136.2400      41.9        64       145        60
OIR    2025130    131400   -9.8000 -136.2500      41.8        65       141        60
OIR    2025130    131400   -9.8000 -136.2600      41.9        67       138        60
OIR    2025130    131400   -9.8000 -136.2700      41.5        68       144        60
OIR    2025130    131400   -9.8000 -136.3300      35.2        63       141        60
OIR    2025130    131400   -9.8000 -136.3400      36.7        65       137        60
OIR    2025130    131400   -9.8000 -136.3500      37.3        66       134        60
OIR    2025130    131400   -9.8000 -136.3600      39.0        69       139        60
OIR    2025130    131400   -9.8000 -136.3700      39.0        69       144        60
OIR    2025130    131400   -9.8000 -136.3800      39.0        69       144        60
OIR    2025130    131400   -9.8000 -136.3900      39.0        69       142        60
OIR    2025130    131400   -9.8000 -136.4000      39.0        69       139        60
OIR    2025130    131400   -9.8000 -136.4100      38.9        69       137        60
OIR    2025130    131400   -9.8000 -136.4200      38.9        69       140        60
OIR    2025130    131400   -9.8000 -136.4300      38.5        68       141        60
OIR    2025130    131400   -9.8000 -136.4400      38.3        68       138        60
OIR    2025130    131400   -9.8000 -136.4500      38.1        67       135        60
OIR    2025130    131400   -9.8000 -136.4600      38.0        67       133        60
OIR    2025130    131400   -9.8000 -136.4700      37.8        67       134        60
OIR    2025130    131400   -9.8000 -136.4800      37.7        67       135        60
OIR    2025130    131400   -9.8000 -136.4900      37.5        66       135        60
OIR    2025130    131400   -9.8000 -136.5000      36.7        65       134        60
OIR    2025130    131400   -9.8000 -136.5100      35.7        64       134        60
OIR    2025130    131400   -9.8000 -136.5200      35.2        63       134        60
OIR    2025130    131400   -9.8000 -136.5300      35.0        63       134        60
OIR    2025130    131400   -9.8000 -136.5400      34.9        62       134        60
OIR    2025130    131400   -9.8000 -136.5500      34.9        62       132        60
OIR    2025130    131400   -9.8000 -136.5600      34.9        62       130        60
OIR    2025130    131400   -9.8000 -136.5700      34.9        63       127        60
OIR    2025130    131400   -9.8000 -136.5800      34.9        63       126        60
OIR    2025130    131400   -9.8000 -136.5900      34.9        64       127        60
OIR    2025130    131400   -9.8000 -136.6000      34.9        64       126        60
OIR    2025130    131400   -9.8000 -136.6100      34.8        64       126        60
OIR    2025130    131400   -9.8000 -136.6200      34.7        64       127        60
OIR    2025130    131400   -9.8000 -136.6300      34.3        65       129        60
OIR    2025130    131400   -9.8000 -136.6400      33.9        65       128        60
OIR    2025130    131400   -9.8000 -136.6500      33.7        66       127        60
OIR    2025130    131400   -9.8000 -136.6600      33.6        66       126        60
OIR    2025130    131400   -9.8000 -136.6700      33.7        66       126        60
OIR    2025130    131400   -9.8000 -136.6800      33.7        66       127        60
OIR    2025130    131400   -9.8000 -136.6900      33.8        66       129        60
OIR    2025130    131400   -9.8000 -136.7000      33.7        63       131        60
OIR    2025130    131400   -9.8000 -136.7100      33.9        59       140        60
OIR    2025130    131400   -9.8000 -136.7500      33.0        53       146        60
OIR    2025130    131400   -9.8000 -136.7600      29.0        52       139        60
OIR    2025130    131400   -9.8000 -136.7700      28.8        51       128        60
OIR    2025130    131400   -9.8000 -136.7800      29.5        51       122        60
OIR    2025130    131400   -9.8000 -136.7900      29.5        51       117        60
OIR    2025130    131400   -9.8000 -136.8000      29.3        51       116        60
OIR    2025130    131400   -9.8000 -136.8100      29.3        51       116        60
OIR    2025130    131400   -9.8000 -136.8200      29.4        51       115        60
OIR    2025130    131400   -9.8000 -136.8300      29.4        50       113        60
OIR    2025130    131400   -9.8000 -136.8400      29.4        50       111        60
OIR    2025130    131400   -9.8000 -136.8500      29.5        50       110        60
OIR    2025130    131400   -9.8000 -136.8600      29.4        50       108        60
OIR    2025130    131400   -9.8000 -136.8700      29.4        49       105        60
OIR    2025130    131400   -9.8000 -136.8800      29.4        49       104        60
OIR    2025130    131400   -9.8000 -136.8900      29.4        49       104        60
OIR    2025130    131400   -9.8000 -136.9000      29.4        48       104        60
OIR    2025130    131400   -9.8000 -136.9100      29.4        48       104        60
OIR    2025130    131400   -9.8000 -136.9200      29.4        48       103        60
OIR    2025130    131400   -9.8000 -136.9300      29.4        47       103        60
OIR    2025130    131400   -9.8000 -136.9400      29.5        47       103        60
OIR    2025130    131400   -9.8000 -136.9500      29.5        46       103        60
OIR    2025130    131400   -9.8000 -136.9600      29.6        45       103        60
OIR    2025130    131400   -9.8000 -136.9700      29.7        45       104        60
OIR    2025130    131400   -9.8000 -136.9800      29.8        44       104        60
OIR    2025130    131400   -9.8000 -136.9900      29.9        44       104        60
OIR    2025130    131400   -9.8000 -137.0000      30.1        44       105        60
OIR    2025130    131400   -9.8000 -137.0100      30.1        44       105        60
OIR    2025130    131400   -9.8000 -137.0200      30.2        44       107        60
OIR    2025130    131400   -9.8000 -137.0300      30.3        44       108        60
OIR    2025130    131400   -9.8000 -137.0400      30.4        44       105        60
OIR    2025130    131400   -9.8000 -137.0500      30.5        44       104        60
OIR    2025130    131400   -9.8000 -137.0600      30.6        44       104        60
OIR    2025130    131400   -9.8000 -137.0700      30.8        44       104        60
OIR    2025130    131400   -9.8000 -137.0800      30.9        44       103        60
OIR    2025130    131400   -9.8000 -137.0900      31.0        44       103        60
OIR    2025130    131400   -9.8000 -137.1000      31.2        44       103        60
OIR    2025130    131400   -9.8000 -137.1100      31.4        44       103        60
OIR    2025130    131400   -9.8000 -137.1200      31.6        44       103        60
OIR    2025130    131400   -9.8000 -137.1300      31.8        45       103        60
OIR    2025130    131400   -9.8000 -137.1400      32.0        45       103        60
OIR    2025130    131400   -9.8000 -137.1500      32.1        45       103        60
OIR    2025130    131400   -9.8000 -137.1600      32.1        45       103        60
OIR    2025130    131400   -9.8000 -137.1700      32.1        45       103        60
OIR    2025130    131400   -9.8000 -137.1800      32.2        45       103        60
OIR    2025130    131400   -9.8000 -137.1900      32.3        45       103        60
OIR    2025130    131400   -9.8000 -137.2000      32.7        46       103        60
OIR    2025130    131400   -9.8000 -137.2100      33.5        47       103        60
OIR    2025130    131400   -9.8000 -137.2200      34.7        48       104        60
OIR    2025130    131400   -9.8000 -137.2300      35.7        49       105        60
OIR    2025130    131400   -9.8000 -137.2400      36.0        49       104        60
OIR    2025130    131400   -9.8000 -137.2500      36.0        49       103        60
OIR    2025130    131400   -9.8000 -137.2600      36.1        49       103        60
OIR    2025130    131400   -9.8000 -137.2700      36.1        49       103        60
OIR    2025130    131400   -9.8000 -137.2800      36.1        49       103        60
OIR    2025130    131400   -9.8000 -137.2900      36.2        49       103        60
OIR    2025130    131400   -9.8000 -137.3000      36.3        49       103        60
OIR    2025130    131400   -9.8000 -137.3100      36.3        49       103        60
OIR    2025130    131400   -9.8000 -137.3200      36.4        49       103        60
OIR    2025130    131400   -9.8000 -137.3300      36.5        48       103        60
OIR    2025130    131400   -9.8000 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8000 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8000 -137.3600      36.4        49       103        60
OIR    2025130    131400   -9.8000 -137.3700      36.0        49       103        60
OIR    2025130    131400   -9.8000 -137.3800      35.8        49       103        60
OIR    2025130    131400   -9.8000 -137.3900      35.5        49       103        60
OIR    2025130    131400   -9.8000 -137.4000      35.0        49       103        60
OIR    2025130    131400   -9.8000 -137.4100      34.3        48       103        60
OIR    2025130    131400   -9.8000 -137.4200      33.7        48       103        60
OIR    2025130    131400   -9.8000 -137.4300      33.0        48       103        60
OIR    2025130    131400   -9.8000 -137.4400      32.4        47       103        60
OIR    2025130    131400   -9.8000 -137.4500      31.9        47       103        60
OIR    2025130    131400   -9.8000 -137.4600      31.6        47       103        60
OIR    2025130    131400   -9.8000 -137.4700      31.0        48       103        60
OIR    2025130    131400   -9.8000 -137.4800      30.7        48       103        60
OIR    2025130    131400   -9.8000 -137.4900      30.4        48       103        60
OIR    2025130    131400   -9.8000 -137.5000      30.3        47       103        60
OIR    2025130    131400   -9.8000 -137.5100      30.1        46       103        60
OIR    2025130    131400   -9.8000 -137.5200      30.1        45       103        60
OIR    2025130    131400   -9.8000 -137.5300      30.4        41       103        60
OIR    2025130    131400   -9.8000 -137.5400      30.9        34       103        60
OIR    2025130    131400   -9.8000 -137.5500      32.0        27       103        60
OIR    2025130    131400   -9.8000 -137.5600      33.4        22       103        60
OIR    2025130    131400   -9.8000 -137.5700      34.5        18       103        60
OIR    2025130    131400   -9.8000 -137.5800      35.0        16       103        60
OIR    2025130    131400   -9.8000 -137.5900      35.4        15       103        60
OIR    2025130    131400   -9.8000 -137.6000      35.6        14       103        60
OIR    2025130    131400   -9.8000 -137.6100      35.7        14       103        60
OIR    2025130    131400   -9.8000 -137.6200      35.8        14       103        60
OIR    2025130    131400   -9.8000 -137.6300      35.9        14       103        60
OIR    2025130    131400   -9.8000 -137.6400      36.0        13       103        60
OIR    2025130    131400   -9.8000 -137.6500      36.2        13       103        60
OIR    2025130    131400   -9.8000 -137.6600      36.3        12       104        60
OIR    2025130    131400   -9.8000 -137.6700      36.4        11       104        60
OIR    2025130    131400   -9.8000 -137.6800      36.6        11       104        60
OIR    2025130    131400   -9.8000 -137.6900      36.8         9       103        60
OIR    2025130    131400   -9.8000 -137.7000      36.8         9       104        60
OIR    2025130    131400   -9.8000 -137.7100      36.9         8       104        60
OIR    2025130    131400   -9.8000 -137.7200      36.9         8       104        60
OIR    2025130    131400   -9.8000 -137.7300      36.8         7       103        60
OIR    2025130    131400   -9.8000 -137.7400      36.6         6       103        60
OIR    2025130    131400   -9.8000 -137.7500      36.1         4       103        60
OIR    2025130    131400   -9.8000 -137.7600      35.7         1       103        60
OIR    2025130    131400   -9.8000 -137.7700      35.4         0       103        60
OIR    2025130    131400   -9.8000 -137.7800      35.1       359       103        60
OIR    2025130    131400   -9.8000 -137.7900      34.8       358       103        60
OIR    2025130    131400   -9.8000 -137.8000      34.5       357       103        60
OIR    2025130    131400   -9.8000 -137.8100      34.4       357       103        60
OIR    2025130    131400   -9.8000 -137.8200      34.2       356       103        60
OIR    2025130    131400   -9.8000 -137.8300      34.0       355       103        60
OIR    2025130    131400   -9.8000 -137.8400      33.9       354       103        60
OIR    2025130    131400   -9.8000 -137.8500      33.7       354       103        60
OIR    2025130    131400   -9.8000 -137.8600      33.6       354       103        60
OIR    2025130    131400   -9.8000 -137.8700      33.4       354       103        60
OIR    2025130    131400   -9.8000 -137.8800      33.2       353       103        60
OIR    2025130    131400   -9.8000 -137.8900      33.2       353       103        60
OIR    2025130    131400   -9.8000 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.8000 -137.9100      33.0       353       103        60
OIR    2025130    131400   -9.8000 -137.9200      32.9       353       103        60
OIR    2025130    131400   -9.8000 -137.9300      32.6       352       103        60
OIR    2025130    131400   -9.8000 -137.9400      32.3       352       103        60
OIR    2025130    131400   -9.8000 -137.9500      32.0       351       103        60
OIR    2025130    131400   -9.8000 -137.9600      31.7       351       103        60
OIR    2025130    131400   -9.8000 -137.9700      31.5       350       104        60
OIR    2025130    131400   -9.8000 -137.9800      31.4       350       104        60
OIR    2025130    131400   -9.8000 -137.9900      31.3       350       108        60
OIR    2025130    131400   -9.8000 -138.0000      31.2       350       110        60
OIR    2025130    131400   -9.8000 -138.0100      31.2       350       114        60
OIR    2025130    131400   -9.8000 -138.0200      31.1       349       119        60
OIR    2025130    131400   -9.8000 -138.0300      31.1       349       120        60
OIR    2025130    131400   -9.8000 -138.0400      31.0       349       120        60
OIR    2025130    131400   -9.8000 -138.0500      30.9       349       119        60
OIR    2025130    131400   -9.8000 -138.0600      30.4       348       119        60
OIR    2025130    131400   -9.8000 -138.0700      29.9       346       119        60
OIR    2025130    131400   -9.8000 -138.0800      29.5       343       123        60
OIR    2025130    131400   -9.8000 -138.0900      29.2       338       130        60
OIR    2025130    131400   -9.8000 -138.1000      29.1       332       133        60
OIR    2025130    131400   -9.8000 -138.1100      29.0       330       135        60
OIR    2025130    131400   -9.8000 -138.1200      28.9       329       138        60
OIR    2025130    131400   -9.8000 -138.1300      28.9       328       141        60
OIR    2025130    131400   -9.8000 -138.1400      28.9       328       143        60
OIR    2025130    131400   -9.8000 -138.1500      28.9       327       144        60
OIR    2025130    131400   -9.8000 -138.1600      28.9       327       141        60
OIR    2025130    131400   -9.8000 -138.1700      28.8       327       138        60
OIR    2025130    131400   -9.8000 -138.1800      28.8       327       133        60
OIR    2025130    131400   -9.8000 -138.1900      28.7       327       128        60
OIR    2025130    131400   -9.8000 -138.2000      28.6       327       125        60
OIR    2025130    131400   -9.8000 -138.2100      28.4       327       123        60
OIR    2025130    131400   -9.8000 -138.2200      27.6       327       122        60
OIR    2025130    131400   -9.8000 -138.2300      26.8       328       120        60
OIR    2025130    131400   -9.8000 -138.2400      26.1       328       119        60
OIR    2025130    131400   -9.8000 -138.2500      25.6       328       119        60
OIR    2025130    131400   -9.8000 -138.2600      25.4       328       120        60
OIR    2025130    131400   -9.8000 -138.2700      25.4       328       121        60
OIR    2025130    131400   -9.8000 -138.2800      25.3       328       123        60
OIR    2025130    131400   -9.8000 -138.2900      25.3       328       125        60
OIR    2025130    131400   -9.8000 -138.3000      25.3       328       129        60
OIR    2025130    131400   -9.8000 -138.3100      25.2       328       133        60
OIR    2025130    131400   -9.8000 -138.3200      25.2       328       136        60
OIR    2025130    131400   -9.8000 -138.3300      25.2       328       138        60
OIR    2025130    131400   -9.8000 -138.3400      25.2       328       138        60
OIR    2025130    131400   -9.8000 -138.3500      25.2       328       138        60
OIR    2025130    131400   -9.8000 -138.3600      25.2       328       140        60
OIR    2025130    131400   -9.8000 -138.3700      25.2       328       142        60
OIR    2025130    131400   -9.8000 -138.3800      25.2       328       144        60
OIR    2025130    131400   -9.8000 -138.3900      25.2       328       146        60
OIR    2025130    131400   -9.8100 -136.0600      39.2        65       148        60
OIR    2025130    131400   -9.8100 -136.0700      39.1        65       149        60
OIR    2025130    131400   -9.8100 -136.2200      41.8        64       147        60
OIR    2025130    131400   -9.8100 -136.2300      41.8        64       145        60
OIR    2025130    131400   -9.8100 -136.2400      41.8        64       144        60
OIR    2025130    131400   -9.8100 -136.2500      41.8        64       143        60
OIR    2025130    131400   -9.8100 -136.2600      41.7        65       142        60
OIR    2025130    131400   -9.8100 -136.2700      41.0        66       146        60
OIR    2025130    131400   -9.8100 -136.3300      35.4        63       143        60
OIR    2025130    131400   -9.8100 -136.3400      37.4        66       140        60
OIR    2025130    131400   -9.8100 -136.3500      37.9        66       137        60
OIR    2025130    131400   -9.8100 -136.3600      39.1        68       142        60
OIR    2025130    131400   -9.8100 -136.3700      39.0        69       147        60
OIR    2025130    131400   -9.8100 -136.3800      39.0        69       146        60
OIR    2025130    131400   -9.8100 -136.3900      39.1        69       144        60
OIR    2025130    131400   -9.8100 -136.4000      39.1        68       140        60
OIR    2025130    131400   -9.8100 -136.4100      38.9        68       140        60
OIR    2025130    131400   -9.8100 -136.4200      38.8        68       144        60
OIR    2025130    131400   -9.8100 -136.4300      38.3        67       146        60
OIR    2025130    131400   -9.8100 -136.4400      38.1        67       140        60
OIR    2025130    131400   -9.8100 -136.4500      38.0        67       136        60
OIR    2025130    131400   -9.8100 -136.4600      38.0        67       134        60
OIR    2025130    131400   -9.8100 -136.4700      37.8        67       135        60
OIR    2025130    131400   -9.8100 -136.4800      37.7        67       137        60
OIR    2025130    131400   -9.8100 -136.4900      37.5        66       137        60
OIR    2025130    131400   -9.8100 -136.5000      36.7        65       136        60
OIR    2025130    131400   -9.8100 -136.5100      35.9        63       137        60
OIR    2025130    131400   -9.8100 -136.5200      35.4        63       137        60
OIR    2025130    131400   -9.8100 -136.5300      35.1        62       139        60
OIR    2025130    131400   -9.8100 -136.5400      34.9        62       139        60
OIR    2025130    131400   -9.8100 -136.5500      34.9        62       135        60
OIR    2025130    131400   -9.8100 -136.5600      34.9        62       131        60
OIR    2025130    131400   -9.8100 -136.5700      35.0        62       127        60
OIR    2025130    131400   -9.8100 -136.5800      35.0        63       126        60
OIR    2025130    131400   -9.8100 -136.5900      35.0        63       125        60
OIR    2025130    131400   -9.8100 -136.6000      35.0        63       126        60
OIR    2025130    131400   -9.8100 -136.6100      35.0        64       126        60
OIR    2025130    131400   -9.8100 -136.6200      34.9        64       127        60
OIR    2025130    131400   -9.8100 -136.6300      34.7        63       127        60
OIR    2025130    131400   -9.8100 -136.6400      34.5        64       127        60
OIR    2025130    131400   -9.8100 -136.6500      34.0        64       127        60
OIR    2025130    131400   -9.8100 -136.6600      33.8        65       127        60
OIR    2025130    131400   -9.8100 -136.6700      33.8        66       129        60
OIR    2025130    131400   -9.8100 -136.6800      33.9        65       131        60
OIR    2025130    131400   -9.8100 -136.6900      34.2        63       133        60
OIR    2025130    131400   -9.8100 -136.7000      34.5        60       135        60
OIR    2025130    131400   -9.8100 -136.7100      34.5        57       141        60
OIR    2025130    131400   -9.8100 -136.7200      34.3        55       146        60
OIR    2025130    131400   -9.8100 -136.7500      33.5        53       144        60
OIR    2025130    131400   -9.8100 -136.7600      31.9        52       138        60
OIR    2025130    131400   -9.8100 -136.7700      31.3        52       129        60
OIR    2025130    131400   -9.8100 -136.7800      30.5        51       124        60
OIR    2025130    131400   -9.8100 -136.7900      30.0        51       120        60
OIR    2025130    131400   -9.8100 -136.8000      29.7        51       117        60
OIR    2025130    131400   -9.8100 -136.8100      29.5        51       117        60
OIR    2025130    131400   -9.8100 -136.8200      29.5        50       116        60
OIR    2025130    131400   -9.8100 -136.8300      29.5        50       114        60
OIR    2025130    131400   -9.8100 -136.8400      29.5        50       113        60
OIR    2025130    131400   -9.8100 -136.8500      29.5        50       112        60
OIR    2025130    131400   -9.8100 -136.8600      29.5        49       110        60
OIR    2025130    131400   -9.8100 -136.8700      29.5        49       108        60
OIR    2025130    131400   -9.8100 -136.8800      29.5        49       107        60
OIR    2025130    131400   -9.8100 -136.8900      29.5        48       104        60
OIR    2025130    131400   -9.8100 -136.9000      29.5        48       104        60
OIR    2025130    131400   -9.8100 -136.9100      29.5        48       103        60
OIR    2025130    131400   -9.8100 -136.9200      29.5        47       103        60
OIR    2025130    131400   -9.8100 -136.9300      29.6        47       103        60
OIR    2025130    131400   -9.8100 -136.9400      29.6        47       104        60
OIR    2025130    131400   -9.8100 -136.9500      29.7        46       104        60
OIR    2025130    131400   -9.8100 -136.9600      29.7        45       104        60
OIR    2025130    131400   -9.8100 -136.9700      29.8        44       104        60
OIR    2025130    131400   -9.8100 -136.9800      29.9        44       104        60
OIR    2025130    131400   -9.8100 -136.9900      30.0        44       105        60
OIR    2025130    131400   -9.8100 -137.0000      30.1        44       105        60
OIR    2025130    131400   -9.8100 -137.0100      30.1        44       107        60
OIR    2025130    131400   -9.8100 -137.0200      30.2        44       107        60
OIR    2025130    131400   -9.8100 -137.0300      30.3        44       108        60
OIR    2025130    131400   -9.8100 -137.0400      30.3        44       105        60
OIR    2025130    131400   -9.8100 -137.0500      30.4        44       104        60
OIR    2025130    131400   -9.8100 -137.0600      30.5        43       104        60
OIR    2025130    131400   -9.8100 -137.0700      30.6        43       104        60
OIR    2025130    131400   -9.8100 -137.0800      30.8        43       104        60
OIR    2025130    131400   -9.8100 -137.0900      30.9        43       103        60
OIR    2025130    131400   -9.8100 -137.1000      31.1        44       103        60
OIR    2025130    131400   -9.8100 -137.1100      31.2        44       103        60
OIR    2025130    131400   -9.8100 -137.1200      31.4        44       103        60
OIR    2025130    131400   -9.8100 -137.1300      31.5        44       103        60
OIR    2025130    131400   -9.8100 -137.1400      31.8        45       103        60
OIR    2025130    131400   -9.8100 -137.1500      32.0        45       103        60
OIR    2025130    131400   -9.8100 -137.1600      32.0        45       103        60
OIR    2025130    131400   -9.8100 -137.1700      32.1        45       103        60
OIR    2025130    131400   -9.8100 -137.1800      32.2        45       103        60
OIR    2025130    131400   -9.8100 -137.1900      32.3        45       103        60
OIR    2025130    131400   -9.8100 -137.2000      32.6        46       103        60
OIR    2025130    131400   -9.8100 -137.2100      33.9        47       103        60
OIR    2025130    131400   -9.8100 -137.2200      35.3        48       104        60
OIR    2025130    131400   -9.8100 -137.2300      36.0        48       105        60
OIR    2025130    131400   -9.8100 -137.2400      36.2        48       105        60
OIR    2025130    131400   -9.8100 -137.2500      36.4        48       104        60
OIR    2025130    131400   -9.8100 -137.2600      36.4        48       103        60
OIR    2025130    131400   -9.8100 -137.2700      36.5        48       103        60
OIR    2025130    131400   -9.8100 -137.2800      36.5        48       103        60
OIR    2025130    131400   -9.8100 -137.2900      36.5        48       103        60
OIR    2025130    131400   -9.8100 -137.3000      36.5        48       103        60
OIR    2025130    131400   -9.8100 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8100 -137.3700      36.4        48       103        60
OIR    2025130    131400   -9.8100 -137.3800      36.0        49       103        60
OIR    2025130    131400   -9.8100 -137.3900      35.6        48       103        60
OIR    2025130    131400   -9.8100 -137.4000      35.1        48       103        60
OIR    2025130    131400   -9.8100 -137.4100      34.4        48       103        60
OIR    2025130    131400   -9.8100 -137.4200      33.7        47       103        60
OIR    2025130    131400   -9.8100 -137.4300      33.1        47       103        60
OIR    2025130    131400   -9.8100 -137.4400      32.5        47       103        60
OIR    2025130    131400   -9.8100 -137.4500      32.2        46       103        60
OIR    2025130    131400   -9.8100 -137.4600      32.0        46       103        60
OIR    2025130    131400   -9.8100 -137.4700      31.7        46       103        60
OIR    2025130    131400   -9.8100 -137.4800      31.3        46       103        60
OIR    2025130    131400   -9.8100 -137.4900      30.7        46       103        60
OIR    2025130    131400   -9.8100 -137.5000      30.4        45       103        60
OIR    2025130    131400   -9.8100 -137.5100      30.4        44       103        60
OIR    2025130    131400   -9.8100 -137.5200      30.7        40       103        60
OIR    2025130    131400   -9.8100 -137.5300      31.4        34       103        60
OIR    2025130    131400   -9.8100 -137.5400      32.4        27       103        60
OIR    2025130    131400   -9.8100 -137.5500      33.7        22       103        60
OIR    2025130    131400   -9.8100 -137.5600      34.6        18       103        60
OIR    2025130    131400   -9.8100 -137.5700      35.2        16       103        60
OIR    2025130    131400   -9.8100 -137.5800      35.4        15       103        60
OIR    2025130    131400   -9.8100 -137.5900      35.6        15       103        60
OIR    2025130    131400   -9.8100 -137.6000      35.7        14       103        60
OIR    2025130    131400   -9.8100 -137.6100      35.8        14       103        60
OIR    2025130    131400   -9.8100 -137.6200      35.8        14       103        60
OIR    2025130    131400   -9.8100 -137.6300      35.9        14       103        60
OIR    2025130    131400   -9.8100 -137.6400      36.0        13       103        60
OIR    2025130    131400   -9.8100 -137.6500      36.2        13       103        60
OIR    2025130    131400   -9.8100 -137.6600      36.4        12       104        60
OIR    2025130    131400   -9.8100 -137.6700      36.6        11       104        60
OIR    2025130    131400   -9.8100 -137.6800      36.7        11       104        60
OIR    2025130    131400   -9.8100 -137.6900      36.9         9       104        60
OIR    2025130    131400   -9.8100 -137.7000      36.9         9       105        60
OIR    2025130    131400   -9.8100 -137.7100      37.0         8       107        60
OIR    2025130    131400   -9.8100 -137.7200      36.9         8       107        60
OIR    2025130    131400   -9.8100 -137.7300      36.9         7       107        60
OIR    2025130    131400   -9.8100 -137.7400      36.8         7       104        60
OIR    2025130    131400   -9.8100 -137.7500      36.4         5       104        60
OIR    2025130    131400   -9.8100 -137.7600      35.8         2       104        60
OIR    2025130    131400   -9.8100 -137.7700      35.4         0       104        60
OIR    2025130    131400   -9.8100 -137.7800      35.2       359       104        60
OIR    2025130    131400   -9.8100 -137.7900      34.9       358       104        60
OIR    2025130    131400   -9.8100 -137.8000      34.6       357       104        60
OIR    2025130    131400   -9.8100 -137.8100      34.4       357       104        60
OIR    2025130    131400   -9.8100 -137.8200      34.2       356       104        60
OIR    2025130    131400   -9.8100 -137.8300      34.0       355       103        60
OIR    2025130    131400   -9.8100 -137.8400      33.9       355       103        60
OIR    2025130    131400   -9.8100 -137.8500      33.8       354       103        60
OIR    2025130    131400   -9.8100 -137.8600      33.6       354       103        60
OIR    2025130    131400   -9.8100 -137.8700      33.4       354       103        60
OIR    2025130    131400   -9.8100 -137.8800      33.3       353       103        60
OIR    2025130    131400   -9.8100 -137.8900      33.2       353       103        60
OIR    2025130    131400   -9.8100 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.8100 -137.9100      33.0       353       103        60
OIR    2025130    131400   -9.8100 -137.9200      32.8       353       103        60
OIR    2025130    131400   -9.8100 -137.9300      32.5       352       103        60
OIR    2025130    131400   -9.8100 -137.9400      32.3       352       103        60
OIR    2025130    131400   -9.8100 -137.9500      31.9       351       103        60
OIR    2025130    131400   -9.8100 -137.9600      31.7       350       103        60
OIR    2025130    131400   -9.8100 -137.9700      31.6       350       104        60
OIR    2025130    131400   -9.8100 -137.9800      31.5       350       105        60
OIR    2025130    131400   -9.8100 -137.9900      31.4       350       108        60
OIR    2025130    131400   -9.8100 -138.0000      31.3       350       110        60
OIR    2025130    131400   -9.8100 -138.0100      31.2       350       114        60
OIR    2025130    131400   -9.8100 -138.0200      31.2       349       119        60
OIR    2025130    131400   -9.8100 -138.0300      31.1       349       121        60
OIR    2025130    131400   -9.8100 -138.0400      31.1       349       122        60
OIR    2025130    131400   -9.8100 -138.0500      31.0       349       123        60
OIR    2025130    131400   -9.8100 -138.0600      30.7       348       123        60
OIR    2025130    131400   -9.8100 -138.0700      30.1       346       122        60
OIR    2025130    131400   -9.8100 -138.0800      29.6       343       124        60
OIR    2025130    131400   -9.8100 -138.0900      29.2       338       129        60
OIR    2025130    131400   -9.8100 -138.1000      29.1       334       132        60
OIR    2025130    131400   -9.8100 -138.1100      29.1       331       134        60
OIR    2025130    131400   -9.8100 -138.1200      29.0       330       137        60
OIR    2025130    131400   -9.8100 -138.1300      29.0       329       141        60
OIR    2025130    131400   -9.8100 -138.1400      29.0       328       142        60
OIR    2025130    131400   -9.8100 -138.1500      29.0       327       142        60
OIR    2025130    131400   -9.8100 -138.1600      28.9       327       140        60
OIR    2025130    131400   -9.8100 -138.1700      28.9       327       137        60
OIR    2025130    131400   -9.8100 -138.1800      28.8       327       134        60
OIR    2025130    131400   -9.8100 -138.1900      28.7       327       131        60
OIR    2025130    131400   -9.8100 -138.2000      28.6       327       128        60
OIR    2025130    131400   -9.8100 -138.2100      28.1       327       126        60
OIR    2025130    131400   -9.8100 -138.2200      27.4       327       124        60
OIR    2025130    131400   -9.8100 -138.2300      26.6       327       123        60
OIR    2025130    131400   -9.8100 -138.2400      25.9       328       121        60
OIR    2025130    131400   -9.8100 -138.2500      25.5       328       121        60
OIR    2025130    131400   -9.8100 -138.2600      25.4       328       122        60
OIR    2025130    131400   -9.8100 -138.2700      25.4       328       122        60
OIR    2025130    131400   -9.8100 -138.2800      25.3       328       123        60
OIR    2025130    131400   -9.8100 -138.2900      25.3       328       125        60
OIR    2025130    131400   -9.8100 -138.3000      25.3       328       129        60
OIR    2025130    131400   -9.8100 -138.3100      25.3       328       133        60
OIR    2025130    131400   -9.8100 -138.3200      25.3       328       135        60
OIR    2025130    131400   -9.8100 -138.3300      25.2       328       137        60
OIR    2025130    131400   -9.8100 -138.3400      25.2       328       138        60
OIR    2025130    131400   -9.8100 -138.3500      25.2       328       140        60
OIR    2025130    131400   -9.8100 -138.3600      25.2       328       140        60
OIR    2025130    131400   -9.8100 -138.3700      25.2       328       141        60
OIR    2025130    131400   -9.8100 -138.3800      25.3       328       143        60
OIR    2025130    131400   -9.8100 -138.3900      25.3       328       145        60
OIR    2025130    131400   -9.8200 -136.0600      39.1        65       149        60
OIR    2025130    131400   -9.8200 -136.1600      41.7        64       149        60
OIR    2025130    131400   -9.8200 -136.1700      41.7        64       148        60
OIR    2025130    131400   -9.8200 -136.2200      41.7        64       144        60
OIR    2025130    131400   -9.8200 -136.2300      41.7        64       142        60
OIR    2025130    131400   -9.8200 -136.2400      41.7        64       142        60
OIR    2025130    131400   -9.8200 -136.2500      41.7        64       144        60
OIR    2025130    131400   -9.8200 -136.2600      41.6        64       146        60
OIR    2025130    131400   -9.8200 -136.3300      36.4        64       146        60
OIR    2025130    131400   -9.8200 -136.3400      38.0        65       143        60
OIR    2025130    131400   -9.8200 -136.3500      38.3        66       142        60
OIR    2025130    131400   -9.8200 -136.3600      39.1        67       146        60
OIR    2025130    131400   -9.8200 -136.3900      39.2        67       145        60
OIR    2025130    131400   -9.8200 -136.4000      39.2        67       142        60
OIR    2025130    131400   -9.8200 -136.4100      38.9        67       144        60
OIR    2025130    131400   -9.8200 -136.4400      38.0        67       143        60
OIR    2025130    131400   -9.8200 -136.4500      38.0        67       139        60
OIR    2025130    131400   -9.8200 -136.4600      37.9        67       137        60
OIR    2025130    131400   -9.8200 -136.4700      37.8        67       138        60
OIR    2025130    131400   -9.8200 -136.4800      37.7        66       138        60
OIR    2025130    131400   -9.8200 -136.4900      37.5        66       139        60
OIR    2025130    131400   -9.8200 -136.5000      36.6        64       139        60
OIR    2025130    131400   -9.8200 -136.5100      36.2        63       139        60
OIR    2025130    131400   -9.8200 -136.5200      35.8        62       141        60
OIR    2025130    131400   -9.8200 -136.5300      35.2        62       144        60
OIR    2025130    131400   -9.8200 -136.5400      35.0        62       145        60
OIR    2025130    131400   -9.8200 -136.5500      35.0        62       140        60
OIR    2025130    131400   -9.8200 -136.5600      35.0        62       134        60
OIR    2025130    131400   -9.8200 -136.5700      35.1        62       128        60
OIR    2025130    131400   -9.8200 -136.5800      35.3        62       126        60
OIR    2025130    131400   -9.8200 -136.5900      35.4        62       125        60
OIR    2025130    131400   -9.8200 -136.6000      35.3        63       126        60
OIR    2025130    131400   -9.8200 -136.6100      35.2        63       127        60
OIR    2025130    131400   -9.8200 -136.6200      35.2        63       127        60
OIR    2025130    131400   -9.8200 -136.6300      35.2        62       127        60
OIR    2025130    131400   -9.8200 -136.6400      35.2        62       126        60
OIR    2025130    131400   -9.8200 -136.6500      35.5        61       127        60
OIR    2025130    131400   -9.8200 -136.6600      35.8        61       129        60
OIR    2025130    131400   -9.8200 -136.6700      36.1        60       132        60
OIR    2025130    131400   -9.8200 -136.6800      36.1        59       136        60
OIR    2025130    131400   -9.8200 -136.6900      35.9        58       138        60
OIR    2025130    131400   -9.8200 -136.7000      35.5        57       139        60
OIR    2025130    131400   -9.8200 -136.7100      34.8        56       139        60
OIR    2025130    131400   -9.8200 -136.7200      34.4        55       140        60
OIR    2025130    131400   -9.8200 -136.7300      34.0        54       142        60
OIR    2025130    131400   -9.8200 -136.7400      33.8        53       143        60
OIR    2025130    131400   -9.8200 -136.7500      33.4        52       141        60
OIR    2025130    131400   -9.8200 -136.7600      32.3        51       137        60
OIR    2025130    131400   -9.8200 -136.7700      31.9        51       131        60
OIR    2025130    131400   -9.8200 -136.7800      31.4        51       127        60
OIR    2025130    131400   -9.8200 -136.7900      30.8        51       123        60
OIR    2025130    131400   -9.8200 -136.8000      30.2        51       121        60
OIR    2025130    131400   -9.8200 -136.8100      29.9        50       120        60
OIR    2025130    131400   -9.8200 -136.8200      29.8        50       116        60
OIR    2025130    131400   -9.8200 -136.8300      29.7        50       115        60
OIR    2025130    131400   -9.8200 -136.8400      29.6        50       115        60
OIR    2025130    131400   -9.8200 -136.8500      29.6        50       115        60
OIR    2025130    131400   -9.8200 -136.8600      29.6        49       112        60
OIR    2025130    131400   -9.8200 -136.8700      29.6        49       110        60
OIR    2025130    131400   -9.8200 -136.8800      29.6        49       109        60
OIR    2025130    131400   -9.8200 -136.8900      29.6        48       107        60
OIR    2025130    131400   -9.8200 -136.9000      29.6        48       104        60
OIR    2025130    131400   -9.8200 -136.9100      29.6        47       103        60
OIR    2025130    131400   -9.8200 -136.9200      29.6        47       103        60
OIR    2025130    131400   -9.8200 -136.9300      29.7        47       104        60
OIR    2025130    131400   -9.8200 -136.9400      29.7        46       104        60
OIR    2025130    131400   -9.8200 -136.9500      29.8        45       104        60
OIR    2025130    131400   -9.8200 -136.9600      29.9        44       105        60
OIR    2025130    131400   -9.8200 -136.9700      29.9        44       105        60
OIR    2025130    131400   -9.8200 -136.9800      30.0        44       104        60
OIR    2025130    131400   -9.8200 -136.9900      30.0        44       107        60
OIR    2025130    131400   -9.8200 -137.0000      30.1        44       107        60
OIR    2025130    131400   -9.8200 -137.0100      30.1        44       107        60
OIR    2025130    131400   -9.8200 -137.0200      30.2        44       107        60
OIR    2025130    131400   -9.8200 -137.0300      30.2        43       108        60
OIR    2025130    131400   -9.8200 -137.0400      30.3        43       107        60
OIR    2025130    131400   -9.8200 -137.0500      30.4        43       104        60
OIR    2025130    131400   -9.8200 -137.0600      30.5        43       105        60
OIR    2025130    131400   -9.8200 -137.0700      30.5        43       105        60
OIR    2025130    131400   -9.8200 -137.0800      30.6        43       104        60
OIR    2025130    131400   -9.8200 -137.0900      30.7        43       103        60
OIR    2025130    131400   -9.8200 -137.1000      30.8        43       103        60
OIR    2025130    131400   -9.8200 -137.1100      31.0        43       103        60
OIR    2025130    131400   -9.8200 -137.1200      31.1        44       103        60
OIR    2025130    131400   -9.8200 -137.1300      31.2        44       103        60
OIR    2025130    131400   -9.8200 -137.1400      31.4        44       103        60
OIR    2025130    131400   -9.8200 -137.1500      31.7        45       103        60
OIR    2025130    131400   -9.8200 -137.1600      31.8        45       103        60
OIR    2025130    131400   -9.8200 -137.1700      31.9        45       103        60
OIR    2025130    131400   -9.8200 -137.1800      32.1        45       103        60
OIR    2025130    131400   -9.8200 -137.1900      32.2        45       103        60
OIR    2025130    131400   -9.8200 -137.2000      32.6        45       103        60
OIR    2025130    131400   -9.8200 -137.2100      34.0        47       103        60
OIR    2025130    131400   -9.8200 -137.2200      35.6        48       104        60
OIR    2025130    131400   -9.8200 -137.2300      36.2        48       105        60
OIR    2025130    131400   -9.8200 -137.2400      36.4        48       105        60
OIR    2025130    131400   -9.8200 -137.2500      36.5        48       104        60
OIR    2025130    131400   -9.8200 -137.2600      36.5        48       104        60
OIR    2025130    131400   -9.8200 -137.2700      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3400      36.7        48       103        60
OIR    2025130    131400   -9.8200 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8200 -137.3700      36.5        48       103        60
OIR    2025130    131400   -9.8200 -137.3800      36.2        48       103        60
OIR    2025130    131400   -9.8200 -137.3900      35.6        48       103        60
OIR    2025130    131400   -9.8200 -137.4000      35.1        48       103        60
OIR    2025130    131400   -9.8200 -137.4100      34.4        47       103        60
OIR    2025130    131400   -9.8200 -137.4200      33.7        47       103        60
OIR    2025130    131400   -9.8200 -137.4300      33.1        46       103        60
OIR    2025130    131400   -9.8200 -137.4400      32.7        46       103        60
OIR    2025130    131400   -9.8200 -137.4500      32.4        45       103        60
OIR    2025130    131400   -9.8200 -137.4600      32.2        45       103        60
OIR    2025130    131400   -9.8200 -137.4700      32.0        44       103        60
OIR    2025130    131400   -9.8200 -137.4800      31.8        43       103        60
OIR    2025130    131400   -9.8200 -137.4900      31.7        42       103        60
OIR    2025130    131400   -9.8200 -137.5000      31.6        40       103        60
OIR    2025130    131400   -9.8200 -137.5100      31.6        38       103        60
OIR    2025130    131400   -9.8200 -137.5200      31.9        34       103        60
OIR    2025130    131400   -9.8200 -137.5300      32.4        28       103        60
OIR    2025130    131400   -9.8200 -137.5400      33.5        22       103        60
OIR    2025130    131400   -9.8200 -137.5500      34.6        19       103        60
OIR    2025130    131400   -9.8200 -137.5600      35.2        17       103        60
OIR    2025130    131400   -9.8200 -137.5700      35.4        16       103        60
OIR    2025130    131400   -9.8200 -137.5800      35.6        15       103        60
OIR    2025130    131400   -9.8200 -137.5900      35.7        14       103        60
OIR    2025130    131400   -9.8200 -137.6000      35.8        14       103        60
OIR    2025130    131400   -9.8200 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8200 -137.6200      35.9        14       103        60
OIR    2025130    131400   -9.8200 -137.6300      35.9        14       103        60
OIR    2025130    131400   -9.8200 -137.6400      36.0        13       103        60
OIR    2025130    131400   -9.8200 -137.6500      36.2        13       103        60
OIR    2025130    131400   -9.8200 -137.6600      36.5        12       104        60
OIR    2025130    131400   -9.8200 -137.6700      36.6        11       104        60
OIR    2025130    131400   -9.8200 -137.6800      36.8        10       104        60
OIR    2025130    131400   -9.8200 -137.6900      37.0         9       104        60
OIR    2025130    131400   -9.8200 -137.7000      37.0         9       108        60
OIR    2025130    131400   -9.8200 -137.7100      37.0         9       110        60
OIR    2025130    131400   -9.8200 -137.7200      37.0         8       110        60
OIR    2025130    131400   -9.8200 -137.7300      37.0         8       110        60
OIR    2025130    131400   -9.8200 -137.7400      36.9         7       107        60
OIR    2025130    131400   -9.8200 -137.7500      36.7         6       105        60
OIR    2025130    131400   -9.8200 -137.7600      36.0         2       104        60
OIR    2025130    131400   -9.8200 -137.7700      35.5         0       104        60
OIR    2025130    131400   -9.8200 -137.7800      35.3       360       105        60
OIR    2025130    131400   -9.8200 -137.7900      34.9       359       105        60
OIR    2025130    131400   -9.8200 -137.8000      34.6       357       105        60
OIR    2025130    131400   -9.8200 -137.8100      34.3       357       105        60
OIR    2025130    131400   -9.8200 -137.8200      34.2       356       104        60
OIR    2025130    131400   -9.8200 -137.8300      34.0       355       104        60
OIR    2025130    131400   -9.8200 -137.8400      33.9       355       103        60
OIR    2025130    131400   -9.8200 -137.8500      33.8       354       103        60
OIR    2025130    131400   -9.8200 -137.8600      33.7       354       103        60
OIR    2025130    131400   -9.8200 -137.8700      33.4       353       103        60
OIR    2025130    131400   -9.8200 -137.8800      33.3       353       103        60
OIR    2025130    131400   -9.8200 -137.8900      33.2       353       103        60
OIR    2025130    131400   -9.8200 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.8200 -137.9100      33.0       353       103        60
OIR    2025130    131400   -9.8200 -137.9200      32.7       352       103        60
OIR    2025130    131400   -9.8200 -137.9300      32.4       352       104        60
OIR    2025130    131400   -9.8200 -137.9400      32.1       351       104        60
OIR    2025130    131400   -9.8200 -137.9500      31.8       351       104        60
OIR    2025130    131400   -9.8200 -137.9600      31.7       350       104        60
OIR    2025130    131400   -9.8200 -137.9700      31.6       350       104        60
OIR    2025130    131400   -9.8200 -137.9800      31.5       350       107        60
OIR    2025130    131400   -9.8200 -137.9900      31.4       350       109        60
OIR    2025130    131400   -9.8200 -138.0000      31.3       350       111        60
OIR    2025130    131400   -9.8200 -138.0100      31.2       350       114        60
OIR    2025130    131400   -9.8200 -138.0200      31.2       349       117        60
OIR    2025130    131400   -9.8200 -138.0300      31.1       349       121        60
OIR    2025130    131400   -9.8200 -138.0400      31.1       349       123        60
OIR    2025130    131400   -9.8200 -138.0500      31.1       349       124        60
OIR    2025130    131400   -9.8200 -138.0600      30.9       348       125        60
OIR    2025130    131400   -9.8200 -138.0700      30.3       347       124        60
OIR    2025130    131400   -9.8200 -138.0800      29.6       344       126        60
OIR    2025130    131400   -9.8200 -138.0900      29.2       340       128        60
OIR    2025130    131400   -9.8200 -138.1000      29.1       336       131        60
OIR    2025130    131400   -9.8200 -138.1100      29.1       332       134        60
OIR    2025130    131400   -9.8200 -138.1200      29.0       330       137        60
OIR    2025130    131400   -9.8200 -138.1300      29.0       329       140        60
OIR    2025130    131400   -9.8200 -138.1400      29.0       329       141        60
OIR    2025130    131400   -9.8200 -138.1500      29.1       328       141        60
OIR    2025130    131400   -9.8200 -138.1600      29.0       328       139        60
OIR    2025130    131400   -9.8200 -138.1700      29.0       327       136        60
OIR    2025130    131400   -9.8200 -138.1800      28.9       327       134        60
OIR    2025130    131400   -9.8200 -138.1900      28.8       327       132        60
OIR    2025130    131400   -9.8200 -138.2000      28.5       327       130        60
OIR    2025130    131400   -9.8200 -138.2100      27.9       327       129        60
OIR    2025130    131400   -9.8200 -138.2200      27.2       327       127        60
OIR    2025130    131400   -9.8200 -138.2300      26.5       327       125        60
OIR    2025130    131400   -9.8200 -138.2400      25.8       328       123        60
OIR    2025130    131400   -9.8200 -138.2500      25.5       328       123        60
OIR    2025130    131400   -9.8200 -138.2600      25.4       328       123        60
OIR    2025130    131400   -9.8200 -138.2700      25.4       328       124        60
OIR    2025130    131400   -9.8200 -138.2800      25.4       328       124        60
OIR    2025130    131400   -9.8200 -138.2900      25.3       328       126        60
OIR    2025130    131400   -9.8200 -138.3000      25.3       328       129        60
OIR    2025130    131400   -9.8200 -138.3100      25.3       328       133        60
OIR    2025130    131400   -9.8200 -138.3200      25.3       328       135        60
OIR    2025130    131400   -9.8200 -138.3300      25.3       328       137        60
OIR    2025130    131400   -9.8200 -138.3400      25.3       328       139        60
OIR    2025130    131400   -9.8200 -138.3500      25.3       328       141        60
OIR    2025130    131400   -9.8200 -138.3600      25.3       328       140        60
OIR    2025130    131400   -9.8200 -138.3700      25.3       328       141        60
OIR    2025130    131400   -9.8200 -138.3800      25.3       328       142        60
OIR    2025130    131400   -9.8200 -138.3900      25.3       328       144        60
OIR    2025130    131400   -9.8200 -138.4000      25.3       328       149        60
OIR    2025130    131400   -9.8300 -136.0600      39.0        65       150        60
OIR    2025130    131400   -9.8300 -136.1600      41.5        64       148        60
OIR    2025130    131400   -9.8300 -136.1700      41.6        64       145        60
OIR    2025130    131400   -9.8300 -136.2100      41.7        64       149        60
OIR    2025130    131400   -9.8300 -136.2200      41.7        64       142        60
OIR    2025130    131400   -9.8300 -136.2300      41.7        64       141        60
OIR    2025130    131400   -9.8300 -136.2400      41.7        64       142        60
OIR    2025130    131400   -9.8300 -136.2500      41.6        64       144        60
OIR    2025130    131400   -9.8300 -136.2600      41.5        64       146        60
OIR    2025130    131400   -9.8300 -136.3400      38.3        65       146        60
OIR    2025130    131400   -9.8300 -136.3500      38.5        65       146        60
OIR    2025130    131400   -9.8300 -136.3900      39.1        66       143        60
OIR    2025130    131400   -9.8300 -136.4000      39.2        67       141        60
OIR    2025130    131400   -9.8300 -136.4100      38.9        66       142        60
OIR    2025130    131400   -9.8300 -136.4400      37.9        66       145        60
OIR    2025130    131400   -9.8300 -136.4500      37.8        66       142        60
OIR    2025130    131400   -9.8300 -136.4600      37.8        66       140        60
OIR    2025130    131400   -9.8300 -136.4700      37.7        66       140        60
OIR    2025130    131400   -9.8300 -136.4800      37.7        66       140        60
OIR    2025130    131400   -9.8300 -136.4900      37.2        65       139        60
OIR    2025130    131400   -9.8300 -136.5000      36.4        63       138        60
OIR    2025130    131400   -9.8300 -136.5100      36.2        62       138        60
OIR    2025130    131400   -9.8300 -136.5200      36.1        61       140        60
OIR    2025130    131400   -9.8300 -136.5300      35.4        61       143        60
OIR    2025130    131400   -9.8300 -136.5400      35.2        61       143        60
OIR    2025130    131400   -9.8300 -136.5500      35.1        61       139        60
OIR    2025130    131400   -9.8300 -136.5600      35.1        61       135        60
OIR    2025130    131400   -9.8300 -136.5700      35.2        61       132        60
OIR    2025130    131400   -9.8300 -136.5800      35.4        62       130        60
OIR    2025130    131400   -9.8300 -136.5900      35.7        61       128        60
OIR    2025130    131400   -9.8300 -136.6000      35.9        61       127        60
OIR    2025130    131400   -9.8300 -136.6100      36.1        60       127        60
OIR    2025130    131400   -9.8300 -136.6200      36.3        60       127        60
OIR    2025130    131400   -9.8300 -136.6300      36.2        60       126        60
OIR    2025130    131400   -9.8300 -136.6400      35.9        60       124        60
OIR    2025130    131400   -9.8300 -136.6500      36.1        60       125        60
OIR    2025130    131400   -9.8300 -136.6600      36.3        60       127        60
OIR    2025130    131400   -9.8300 -136.6700      36.4        59       131        60
OIR    2025130    131400   -9.8300 -136.6800      36.3        59       135        60
OIR    2025130    131400   -9.8300 -136.6900      36.1        58       137        60
OIR    2025130    131400   -9.8300 -136.7000      35.8        57       139        60
OIR    2025130    131400   -9.8300 -136.7100      35.1        56       139        60
OIR    2025130    131400   -9.8300 -136.7200      34.2        54       138        60
OIR    2025130    131400   -9.8300 -136.7300      33.8        53       140        60
OIR    2025130    131400   -9.8300 -136.7400      33.6        52       142        60
OIR    2025130    131400   -9.8300 -136.7500      33.1        51       140        60
OIR    2025130    131400   -9.8300 -136.7600      32.6        51       137        60
OIR    2025130    131400   -9.8300 -136.7700      32.4        51       132        60
OIR    2025130    131400   -9.8300 -136.7800      32.1        51       128        60
OIR    2025130    131400   -9.8300 -136.7900      31.6        51       125        60
OIR    2025130    131400   -9.8300 -136.8000      30.9        50       123        60
OIR    2025130    131400   -9.8300 -136.8100      30.4        50       122        60
OIR    2025130    131400   -9.8300 -136.8200      30.0        50       119        60
OIR    2025130    131400   -9.8300 -136.8300      29.9        50       116        60
OIR    2025130    131400   -9.8300 -136.8400      29.8        50       115        60
OIR    2025130    131400   -9.8300 -136.8500      29.8        50       114        60
OIR    2025130    131400   -9.8300 -136.8600      29.7        49       112        60
OIR    2025130    131400   -9.8300 -136.8700      29.7        49       110        60
OIR    2025130    131400   -9.8300 -136.8800      29.7        48       109        60
OIR    2025130    131400   -9.8300 -136.8900      29.7        48       107        60
OIR    2025130    131400   -9.8300 -136.9000      29.7        48       104        60
OIR    2025130    131400   -9.8300 -136.9100      29.7        47       104        60
OIR    2025130    131400   -9.8300 -136.9200      29.8        47       103        60
OIR    2025130    131400   -9.8300 -136.9300      29.8        46       103        60
OIR    2025130    131400   -9.8300 -136.9400      29.8        46       104        60
OIR    2025130    131400   -9.8300 -136.9500      29.9        45       104        60
OIR    2025130    131400   -9.8300 -136.9600      29.9        44       105        60
OIR    2025130    131400   -9.8300 -136.9700      30.0        44       105        60
OIR    2025130    131400   -9.8300 -136.9800      30.0        44       107        60
OIR    2025130    131400   -9.8300 -136.9900      30.0        44       107        60
OIR    2025130    131400   -9.8300 -137.0000      30.1        43       107        60
OIR    2025130    131400   -9.8300 -137.0100      30.1        43       105        60
OIR    2025130    131400   -9.8300 -137.0200      30.2        43       107        60
OIR    2025130    131400   -9.8300 -137.0300      30.2        43       107        60
OIR    2025130    131400   -9.8300 -137.0400      30.3        43       105        60
OIR    2025130    131400   -9.8300 -137.0500      30.3        43       104        60
OIR    2025130    131400   -9.8300 -137.0600      30.4        43       104        60
OIR    2025130    131400   -9.8300 -137.0700      30.4        43       105        60
OIR    2025130    131400   -9.8300 -137.0800      30.5        43       104        60
OIR    2025130    131400   -9.8300 -137.0900      30.5        43       103        60
OIR    2025130    131400   -9.8300 -137.1000      30.6        43       103        60
OIR    2025130    131400   -9.8300 -137.1100      30.7        43       103        60
OIR    2025130    131400   -9.8300 -137.1200      30.7        43       103        60
OIR    2025130    131400   -9.8300 -137.1300      30.8        43       103        60
OIR    2025130    131400   -9.8300 -137.1400      30.9        44       103        60
OIR    2025130    131400   -9.8300 -137.1500      31.1        44       103        60
OIR    2025130    131400   -9.8300 -137.1600      31.4        44       103        60
OIR    2025130    131400   -9.8300 -137.1700      31.6        44       103        60
OIR    2025130    131400   -9.8300 -137.1800      31.8        45       103        60
OIR    2025130    131400   -9.8300 -137.1900      32.0        45       103        60
OIR    2025130    131400   -9.8300 -137.2000      32.4        45       103        60
OIR    2025130    131400   -9.8300 -137.2100      33.8        46       103        60
OIR    2025130    131400   -9.8300 -137.2200      35.5        47       104        60
OIR    2025130    131400   -9.8300 -137.2300      36.2        48       104        60
OIR    2025130    131400   -9.8300 -137.2400      36.4        48       104        60
OIR    2025130    131400   -9.8300 -137.2500      36.5        48       104        60
OIR    2025130    131400   -9.8300 -137.2600      36.6        48       104        60
OIR    2025130    131400   -9.8300 -137.2700      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3400      36.7        48       103        60
OIR    2025130    131400   -9.8300 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8300 -137.3700      36.5        48       103        60
OIR    2025130    131400   -9.8300 -137.3800      36.4        48       103        60
OIR    2025130    131400   -9.8300 -137.3900      35.7        47       103        60
OIR    2025130    131400   -9.8300 -137.4000      35.0        47       103        60
OIR    2025130    131400   -9.8300 -137.4100      34.4        46       103        60
OIR    2025130    131400   -9.8300 -137.4200      33.7        46       103        60
OIR    2025130    131400   -9.8300 -137.4300      33.2        45       103        60
OIR    2025130    131400   -9.8300 -137.4400      32.8        45       103        60
OIR    2025130    131400   -9.8300 -137.4500      32.5        45       103        60
OIR    2025130    131400   -9.8300 -137.4600      32.3        44       103        60
OIR    2025130    131400   -9.8300 -137.4700      32.2        43       103        60
OIR    2025130    131400   -9.8300 -137.4800      32.1        42       103        60
OIR    2025130    131400   -9.8300 -137.4900      32.0        40       103        60
OIR    2025130    131400   -9.8300 -137.5000      32.0        37       103        60
OIR    2025130    131400   -9.8300 -137.5100      32.2        34       103        60
OIR    2025130    131400   -9.8300 -137.5200      32.8        29       103        60
OIR    2025130    131400   -9.8300 -137.5300      33.6        23       103        60
OIR    2025130    131400   -9.8300 -137.5400      34.4        19       103        60
OIR    2025130    131400   -9.8300 -137.5500      35.0        17       103        60
OIR    2025130    131400   -9.8300 -137.5600      35.3        16       103        60
OIR    2025130    131400   -9.8300 -137.5700      35.5        15       103        60
OIR    2025130    131400   -9.8300 -137.5800      35.6        15       103        60
OIR    2025130    131400   -9.8300 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8300 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8300 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8300 -137.6200      35.9        14       103        60
OIR    2025130    131400   -9.8300 -137.6300      35.9        14       103        60
OIR    2025130    131400   -9.8300 -137.6400      36.0        13       103        60
OIR    2025130    131400   -9.8300 -137.6500      36.2        13       103        60
OIR    2025130    131400   -9.8300 -137.6600      36.4        12       103        60
OIR    2025130    131400   -9.8300 -137.6700      36.6        11       104        60
OIR    2025130    131400   -9.8300 -137.6800      36.8        10       104        60
OIR    2025130    131400   -9.8300 -137.6900      36.9         9       105        60
OIR    2025130    131400   -9.8300 -137.7000      37.0         9       109        60
OIR    2025130    131400   -9.8300 -137.7100      37.1         9       112        60
OIR    2025130    131400   -9.8300 -137.7200      37.1         8       113        60
OIR    2025130    131400   -9.8300 -137.7300      37.1         8       114        60
OIR    2025130    131400   -9.8300 -137.7400      37.0         7       111        60
OIR    2025130    131400   -9.8300 -137.7500      36.8         7       108        60
OIR    2025130    131400   -9.8300 -137.7600      36.0         3       104        60
OIR    2025130    131400   -9.8300 -137.7700      35.5         1       104        60
OIR    2025130    131400   -9.8300 -137.7800      35.2       360       107        60
OIR    2025130    131400   -9.8300 -137.7900      34.9       359       107        60
OIR    2025130    131400   -9.8300 -137.8000      34.5       358       107        60
OIR    2025130    131400   -9.8300 -137.8100      34.3       357       105        60
OIR    2025130    131400   -9.8300 -137.8200      34.2       356       104        60
OIR    2025130    131400   -9.8300 -137.8300      34.0       355       104        60
OIR    2025130    131400   -9.8300 -137.8400      33.9       355       103        60
OIR    2025130    131400   -9.8300 -137.8500      33.8       354       103        60
OIR    2025130    131400   -9.8300 -137.8600      33.6       354       103        60
OIR    2025130    131400   -9.8300 -137.8700      33.4       353       103        60
OIR    2025130    131400   -9.8300 -137.8800      33.3       353       103        60
OIR    2025130    131400   -9.8300 -137.8900      33.2       353       103        60
OIR    2025130    131400   -9.8300 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.8300 -137.9100      32.9       353       103        60
OIR    2025130    131400   -9.8300 -137.9200      32.6       352       104        60
OIR    2025130    131400   -9.8300 -137.9300      32.2       352       104        60
OIR    2025130    131400   -9.8300 -137.9400      32.0       351       105        60
OIR    2025130    131400   -9.8300 -137.9500      31.8       351       105        60
OIR    2025130    131400   -9.8300 -137.9600      31.6       350       104        60
OIR    2025130    131400   -9.8300 -137.9700      31.5       350       105        60
OIR    2025130    131400   -9.8300 -137.9800      31.5       350       109        60
OIR    2025130    131400   -9.8300 -137.9900      31.4       350       111        60
OIR    2025130    131400   -9.8300 -138.0000      31.3       350       112        60
OIR    2025130    131400   -9.8300 -138.0100      31.3       350       115        60
OIR    2025130    131400   -9.8300 -138.0200      31.2       349       117        60
OIR    2025130    131400   -9.8300 -138.0300      31.1       349       120        60
OIR    2025130    131400   -9.8300 -138.0400      31.1       349       121        60
OIR    2025130    131400   -9.8300 -138.0500      31.1       349       123        60
OIR    2025130    131400   -9.8300 -138.0600      31.0       349       124        60
OIR    2025130    131400   -9.8300 -138.0700      30.6       348       125        60
OIR    2025130    131400   -9.8300 -138.0800      30.0       345       126        60
OIR    2025130    131400   -9.8300 -138.0900      29.5       342       129        60
OIR    2025130    131400   -9.8300 -138.1000      29.3       338       132        60
OIR    2025130    131400   -9.8300 -138.1100      29.2       334       134        60
OIR    2025130    131400   -9.8300 -138.1200      29.2       332       137        60
OIR    2025130    131400   -9.8300 -138.1300      29.2       330       139        60
OIR    2025130    131400   -9.8300 -138.1400      29.2       329       140        60
OIR    2025130    131400   -9.8300 -138.1500      29.2       328       139        60
OIR    2025130    131400   -9.8300 -138.1600      29.2       328       137        60
OIR    2025130    131400   -9.8300 -138.1700      29.2       328       134        60
OIR    2025130    131400   -9.8300 -138.1800      29.0       327       134        60
OIR    2025130    131400   -9.8300 -138.1900      28.8       327       133        60
OIR    2025130    131400   -9.8300 -138.2000      28.4       327       133        60
OIR    2025130    131400   -9.8300 -138.2100      27.8       327       131        60
OIR    2025130    131400   -9.8300 -138.2200      27.0       327       129        60
OIR    2025130    131400   -9.8300 -138.2300      26.3       327       128        60
OIR    2025130    131400   -9.8300 -138.2400      25.7       328       126        60
OIR    2025130    131400   -9.8300 -138.2500      25.5       328       125        60
OIR    2025130    131400   -9.8300 -138.2600      25.4       328       125        60
OIR    2025130    131400   -9.8300 -138.2700      25.4       328       125        60
OIR    2025130    131400   -9.8300 -138.2800      25.4       328       124        60
OIR    2025130    131400   -9.8300 -138.2900      25.4       328       126        60
OIR    2025130    131400   -9.8300 -138.3000      25.3       328       128        60
OIR    2025130    131400   -9.8300 -138.3100      25.3       328       133        60
OIR    2025130    131400   -9.8300 -138.3200      25.3       328       135        60
OIR    2025130    131400   -9.8300 -138.3300      25.3       328       138        60
OIR    2025130    131400   -9.8300 -138.3400      25.3       328       139        60
OIR    2025130    131400   -9.8300 -138.3500      25.3       328       140        60
OIR    2025130    131400   -9.8300 -138.3600      25.3       328       141        60
OIR    2025130    131400   -9.8300 -138.3700      25.3       328       141        60
OIR    2025130    131400   -9.8300 -138.3800      25.3       328       141        60
OIR    2025130    131400   -9.8300 -138.3900      25.3       328       141        60
OIR    2025130    131400   -9.8300 -138.4000      25.3       328       145        60
OIR    2025130    131400   -9.8300 -138.4100      25.3       328       148        60
OIR    2025130    131400   -9.8400 -136.0600      39.0        65       149        60
OIR    2025130    131400   -9.8400 -136.1600      41.3        63       146        60
OIR    2025130    131400   -9.8400 -136.1700      41.5        63       142        60
OIR    2025130    131400   -9.8400 -136.1800      41.6        63       147        60
OIR    2025130    131400   -9.8400 -136.2000      41.7        63       150        60
OIR    2025130    131400   -9.8400 -136.2100      41.6        63       147        60
OIR    2025130    131400   -9.8400 -136.2200      41.6        63       141        60
OIR    2025130    131400   -9.8400 -136.2300      41.6        63       140        60
OIR    2025130    131400   -9.8400 -136.2400      41.6        63       141        60
OIR    2025130    131400   -9.8400 -136.2500      41.5        63       143        60
OIR    2025130    131400   -9.8400 -136.2600      41.4        63       145        60
OIR    2025130    131400   -9.8400 -136.2700      41.1        63       147        60
OIR    2025130    131400   -9.8400 -136.3900      39.1        65       140        60
OIR    2025130    131400   -9.8400 -136.4000      39.1        65       139        60
OIR    2025130    131400   -9.8400 -136.4100      38.8        65       140        60
OIR    2025130    131400   -9.8400 -136.4200      38.6        66       142        60
OIR    2025130    131400   -9.8400 -136.4300      38.1        66       144        60
OIR    2025130    131400   -9.8400 -136.4400      37.9        66       145        60
OIR    2025130    131400   -9.8400 -136.4500      37.8        66       144        60
OIR    2025130    131400   -9.8400 -136.4600      37.7        66       142        60
OIR    2025130    131400   -9.8400 -136.4700      37.7        66       142        60
OIR    2025130    131400   -9.8400 -136.4800      37.6        65       143        60
OIR    2025130    131400   -9.8400 -136.4900      37.1        63       140        60
OIR    2025130    131400   -9.8400 -136.5000      36.6        62       138        60
OIR    2025130    131400   -9.8400 -136.5100      36.3        61       138        60
OIR    2025130    131400   -9.8400 -136.5200      36.3        61       140        60
OIR    2025130    131400   -9.8400 -136.5300      35.9        60       142        60
OIR    2025130    131400   -9.8400 -136.5400      35.9        60       142        60
OIR    2025130    131400   -9.8400 -136.5500      36.1        60       138        60
OIR    2025130    131400   -9.8400 -136.5600      36.4        59       136        60
OIR    2025130    131400   -9.8400 -136.5700      36.5        59       135        60
OIR    2025130    131400   -9.8400 -136.5800      36.5        59       133        60
OIR    2025130    131400   -9.8400 -136.5900      36.4        59       130        60
OIR    2025130    131400   -9.8400 -136.6000      36.4        59       129        60
OIR    2025130    131400   -9.8400 -136.6100      36.5        59       128        60
OIR    2025130    131400   -9.8400 -136.6200      36.6        59       126        60
OIR    2025130    131400   -9.8400 -136.6300      36.7        59       125        60
OIR    2025130    131400   -9.8400 -136.6400      36.8        59       123        60
OIR    2025130    131400   -9.8400 -136.6500      36.8        59       123        60
OIR    2025130    131400   -9.8400 -136.6600      36.8        59       126        60
OIR    2025130    131400   -9.8400 -136.6700      36.6        58       130        60
OIR    2025130    131400   -9.8400 -136.6800      36.5        58       135        60
OIR    2025130    131400   -9.8400 -136.6900      36.3        58       137        60
OIR    2025130    131400   -9.8400 -136.7000      35.9        57       140        60
OIR    2025130    131400   -9.8400 -136.7100      34.9        55       138        60
OIR    2025130    131400   -9.8400 -136.7200      33.7        53       137        60
OIR    2025130    131400   -9.8400 -136.7300      33.2        51       139        60
OIR    2025130    131400   -9.8400 -136.7400      33.0        51       141        60
OIR    2025130    131400   -9.8400 -136.7500      32.8        50       139        60
OIR    2025130    131400   -9.8400 -136.7600      32.7        50       136        60
OIR    2025130    131400   -9.8400 -136.7700      32.6        50       133        60
OIR    2025130    131400   -9.8400 -136.7800      32.6        50       129        60
OIR    2025130    131400   -9.8400 -136.7900      32.3        50       127        60
OIR    2025130    131400   -9.8400 -136.8000      31.9        50       125        60
OIR    2025130    131400   -9.8400 -136.8100      31.1        50       124        60
OIR    2025130    131400   -9.8400 -136.8200      30.4        50       121        60
OIR    2025130    131400   -9.8400 -136.8300      30.2        50       119        60
OIR    2025130    131400   -9.8400 -136.8400      30.0        50       115        60
OIR    2025130    131400   -9.8400 -136.8500      29.9        49       112        60
OIR    2025130    131400   -9.8400 -136.8600      29.9        49       111        60
OIR    2025130    131400   -9.8400 -136.8700      29.8        49       110        60
OIR    2025130    131400   -9.8400 -136.8800      29.8        48       109        60
OIR    2025130    131400   -9.8400 -136.8900      29.8        48       107        60
OIR    2025130    131400   -9.8400 -136.9000      29.8        48       104        60
OIR    2025130    131400   -9.8400 -136.9100      29.8        47       104        60
OIR    2025130    131400   -9.8400 -136.9200      29.9        47       103        60
OIR    2025130    131400   -9.8400 -136.9300      29.9        46       103        60
OIR    2025130    131400   -9.8400 -136.9400      29.9        45       103        60
OIR    2025130    131400   -9.8400 -136.9500      29.9        44       104        60
OIR    2025130    131400   -9.8400 -136.9600      30.0        44       104        60
OIR    2025130    131400   -9.8400 -136.9700      30.0        44       107        60
OIR    2025130    131400   -9.8400 -136.9800      30.0        43       108        60
OIR    2025130    131400   -9.8400 -136.9900      30.0        43       107        60
OIR    2025130    131400   -9.8400 -137.0000      30.1        43       107        60
OIR    2025130    131400   -9.8400 -137.0100      30.1        43       105        60
OIR    2025130    131400   -9.8400 -137.0200      30.2        43       105        60
OIR    2025130    131400   -9.8400 -137.0300      30.2        43       104        60
OIR    2025130    131400   -9.8400 -137.0400      30.2        43       104        60
OIR    2025130    131400   -9.8400 -137.0500      30.3        43       104        60
OIR    2025130    131400   -9.8400 -137.0600      30.3        43       104        60
OIR    2025130    131400   -9.8400 -137.0700      30.4        43       105        60
OIR    2025130    131400   -9.8400 -137.0800      30.4        43       104        60
OIR    2025130    131400   -9.8400 -137.0900      30.5        43       104        60
OIR    2025130    131400   -9.8400 -137.1000      30.5        43       103        60
OIR    2025130    131400   -9.8400 -137.1100      30.5        43       103        60
OIR    2025130    131400   -9.8400 -137.1200      30.5        43       103        60
OIR    2025130    131400   -9.8400 -137.1300      30.6        43       103        60
OIR    2025130    131400   -9.8400 -137.1400      30.6        43       103        60
OIR    2025130    131400   -9.8400 -137.1500      30.7        43       103        60
OIR    2025130    131400   -9.8400 -137.1600      30.9        43       103        60
OIR    2025130    131400   -9.8400 -137.1700      31.2        44       103        60
OIR    2025130    131400   -9.8400 -137.1800      31.6        44       103        60
OIR    2025130    131400   -9.8400 -137.1900      31.8        44       103        60
OIR    2025130    131400   -9.8400 -137.2000      32.3        45       103        60
OIR    2025130    131400   -9.8400 -137.2100      33.8        46       103        60
OIR    2025130    131400   -9.8400 -137.2200      35.1        47       104        60
OIR    2025130    131400   -9.8400 -137.2300      35.8        47       104        60
OIR    2025130    131400   -9.8400 -137.2400      36.4        48       104        60
OIR    2025130    131400   -9.8400 -137.2500      36.5        48       104        60
OIR    2025130    131400   -9.8400 -137.2600      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.2700      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8400 -137.3700      36.5        48       103        60
OIR    2025130    131400   -9.8400 -137.3800      36.4        48       103        60
OIR    2025130    131400   -9.8400 -137.3900      35.6        47       103        60
OIR    2025130    131400   -9.8400 -137.4000      34.9        46       103        60
OIR    2025130    131400   -9.8400 -137.4100      34.4        46       103        60
OIR    2025130    131400   -9.8400 -137.4200      33.8        45       103        60
OIR    2025130    131400   -9.8400 -137.4300      33.3        45       103        60
OIR    2025130    131400   -9.8400 -137.4400      33.0        44       103        60
OIR    2025130    131400   -9.8400 -137.4500      32.7        44       103        60
OIR    2025130    131400   -9.8400 -137.4600      32.6        43       103        60
OIR    2025130    131400   -9.8400 -137.4700      32.4        41       103        60
OIR    2025130    131400   -9.8400 -137.4800      32.3        40       103        60
OIR    2025130    131400   -9.8400 -137.4900      32.3        37       103        60
OIR    2025130    131400   -9.8400 -137.5000      32.4        34       103        60
OIR    2025130    131400   -9.8400 -137.5100      32.8        30       103        60
OIR    2025130    131400   -9.8400 -137.5200      33.6        25       103        60
OIR    2025130    131400   -9.8400 -137.5300      34.5        20       103        60
OIR    2025130    131400   -9.8400 -137.5400      35.0        17       103        60
OIR    2025130    131400   -9.8400 -137.5500      35.3        16       103        60
OIR    2025130    131400   -9.8400 -137.5600      35.4        16       103        60
OIR    2025130    131400   -9.8400 -137.5700      35.5        15       103        60
OIR    2025130    131400   -9.8400 -137.5800      35.7        15       103        60
OIR    2025130    131400   -9.8400 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8400 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8400 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8400 -137.6200      35.9        14       103        60
OIR    2025130    131400   -9.8400 -137.6300      35.9        13       103        60
OIR    2025130    131400   -9.8400 -137.6400      36.0        13       103        60
OIR    2025130    131400   -9.8400 -137.6500      36.2        12       103        60
OIR    2025130    131400   -9.8400 -137.6600      36.4        12       103        60
OIR    2025130    131400   -9.8400 -137.6700      36.6        11       103        60
OIR    2025130    131400   -9.8400 -137.6800      36.7        10       104        60
OIR    2025130    131400   -9.8400 -137.6900      36.9        10       105        60
OIR    2025130    131400   -9.8400 -137.7000      37.0         9       109        60
OIR    2025130    131400   -9.8400 -137.7100      37.0         9       111        60
OIR    2025130    131400   -9.8400 -137.7200      37.1         8       113        60
OIR    2025130    131400   -9.8400 -137.7300      37.0         8       114        60
OIR    2025130    131400   -9.8400 -137.7400      37.0         8       112        60
OIR    2025130    131400   -9.8400 -137.7500      36.9         7       110        60
OIR    2025130    131400   -9.8400 -137.7600      36.0         4       105        60
OIR    2025130    131400   -9.8400 -137.7700      35.5         2       105        60
OIR    2025130    131400   -9.8400 -137.7800      35.2         0       107        60
OIR    2025130    131400   -9.8400 -137.7900      34.8       359       108        60
OIR    2025130    131400   -9.8400 -137.8000      34.5       358       108        60
OIR    2025130    131400   -9.8400 -137.8100      34.2       357       107        60
OIR    2025130    131400   -9.8400 -137.8200      34.1       356       105        60
OIR    2025130    131400   -9.8400 -137.8300      33.9       356       104        60
OIR    2025130    131400   -9.8400 -137.8400      33.8       355       103        60
OIR    2025130    131400   -9.8400 -137.8500      33.6       355       103        60
OIR    2025130    131400   -9.8400 -137.8600      33.5       354       103        60
OIR    2025130    131400   -9.8400 -137.8700      33.3       353       103        60
OIR    2025130    131400   -9.8400 -137.8800      33.3       353       103        60
OIR    2025130    131400   -9.8400 -137.8900      33.2       353       103        60
OIR    2025130    131400   -9.8400 -137.9000      33.1       353       103        60
OIR    2025130    131400   -9.8400 -137.9100      32.9       352       104        60
OIR    2025130    131400   -9.8400 -137.9200      32.5       352       104        60
OIR    2025130    131400   -9.8400 -137.9300      32.2       351       105        60
OIR    2025130    131400   -9.8400 -137.9400      32.0       351       107        60
OIR    2025130    131400   -9.8400 -137.9500      31.8       351       107        60
OIR    2025130    131400   -9.8400 -137.9600      31.6       350       105        60
OIR    2025130    131400   -9.8400 -137.9700      31.5       350       107        60
OIR    2025130    131400   -9.8400 -137.9800      31.4       350       110        60
OIR    2025130    131400   -9.8400 -137.9900      31.4       350       112        60
OIR    2025130    131400   -9.8400 -138.0000      31.3       350       113        60
OIR    2025130    131400   -9.8400 -138.0100      31.3       350       115        60
OIR    2025130    131400   -9.8400 -138.0200      31.2       349       116        60
OIR    2025130    131400   -9.8400 -138.0300      31.2       349       119        60
OIR    2025130    131400   -9.8400 -138.0400      31.1       349       121        60
OIR    2025130    131400   -9.8400 -138.0500      31.1       349       123        60
OIR    2025130    131400   -9.8400 -138.0600      31.0       349       124        60
OIR    2025130    131400   -9.8400 -138.0700      30.9       348       125        60
OIR    2025130    131400   -9.8400 -138.0800      30.4       346       127        60
OIR    2025130    131400   -9.8400 -138.0900      29.8       343       130        60
OIR    2025130    131400   -9.8400 -138.1000      29.5       340       132        60
OIR    2025130    131400   -9.8400 -138.1100      29.5       337       134        60
OIR    2025130    131400   -9.8400 -138.1200      29.4       334       136        60
OIR    2025130    131400   -9.8400 -138.1300      29.4       332       138        60
OIR    2025130    131400   -9.8400 -138.1400      29.4       330       138        60
OIR    2025130    131400   -9.8400 -138.1500      29.5       330       137        60
OIR    2025130    131400   -9.8400 -138.1600      29.6       329       135        60
OIR    2025130    131400   -9.8400 -138.1700      29.4       328       134        60
OIR    2025130    131400   -9.8400 -138.1800      29.1       328       135        60
OIR    2025130    131400   -9.8400 -138.1900      28.8       328       135        60
OIR    2025130    131400   -9.8400 -138.2000      28.4       327       135        60
OIR    2025130    131400   -9.8400 -138.2100      27.8       327       134        60
OIR    2025130    131400   -9.8400 -138.2200      26.8       327       132        60
OIR    2025130    131400   -9.8400 -138.2300      26.1       328       130        60
OIR    2025130    131400   -9.8400 -138.2400      25.6       328       128        60
OIR    2025130    131400   -9.8400 -138.2500      25.4       328       127        60
OIR    2025130    131400   -9.8400 -138.2600      25.4       328       127        60
OIR    2025130    131400   -9.8400 -138.2700      25.4       328       126        60
OIR    2025130    131400   -9.8400 -138.2800      25.4       328       126        60
OIR    2025130    131400   -9.8400 -138.2900      25.4       328       127        60
OIR    2025130    131400   -9.8400 -138.3000      25.3       328       129        60
OIR    2025130    131400   -9.8400 -138.3100      25.3       328       133        60
OIR    2025130    131400   -9.8400 -138.3200      25.3       328       136        60
OIR    2025130    131400   -9.8400 -138.3300      25.3       328       138        60
OIR    2025130    131400   -9.8400 -138.3400      25.3       328       139        60
OIR    2025130    131400   -9.8400 -138.3500      25.3       328       140        60
OIR    2025130    131400   -9.8400 -138.3600      25.3       328       141        60
OIR    2025130    131400   -9.8400 -138.3700      25.3       328       141        60
OIR    2025130    131400   -9.8400 -138.3800      25.3       328       140        60
OIR    2025130    131400   -9.8400 -138.3900      25.3       328       139        60
OIR    2025130    131400   -9.8400 -138.4000      25.4       328       143        60
OIR    2025130    131400   -9.8400 -138.4100      25.4       328       145        60
OIR    2025130    131400   -9.8400 -138.4200      25.4       328       146        60
OIR    2025130    131400   -9.8400 -138.4300      25.4       328       148        60
OIR    2025130    131400   -9.8500 -136.1500      40.7        62       148        60
OIR    2025130    131400   -9.8500 -136.1600      41.0        63       146        60
OIR    2025130    131400   -9.8500 -136.1700      41.3        63       144        60
OIR    2025130    131400   -9.8500 -136.1800      41.5        63       148        60
OIR    2025130    131400   -9.8500 -136.1900      41.5        63       150        60
OIR    2025130    131400   -9.8500 -136.2100      41.6        63       149        60
OIR    2025130    131400   -9.8500 -136.2200      41.6        63       142        60
OIR    2025130    131400   -9.8500 -136.2300      41.6        63       139        60
OIR    2025130    131400   -9.8500 -136.2400      41.6        63       139        60
OIR    2025130    131400   -9.8500 -136.2500      41.4        63       141        60
OIR    2025130    131400   -9.8500 -136.2600      41.3        63       144        60
OIR    2025130    131400   -9.8500 -136.2700      41.1        63       146        60
OIR    2025130    131400   -9.8500 -136.2800      40.8        63       147        60
OIR    2025130    131400   -9.8500 -136.2900      40.0        62       147        60
OIR    2025130    131400   -9.8500 -136.3000      39.3        62       147        60
OIR    2025130    131400   -9.8500 -136.3500      38.5        62       147        60
OIR    2025130    131400   -9.8500 -136.3600      38.9        62       147        60
OIR    2025130    131400   -9.8500 -136.3700      39.1        63       147        60
OIR    2025130    131400   -9.8500 -136.3800      39.2        63       145        60
OIR    2025130    131400   -9.8500 -136.3900      39.2        63       142        60
OIR    2025130    131400   -9.8500 -136.4000      39.1        63       141        60
OIR    2025130    131400   -9.8500 -136.4100      38.7        64       140        60
OIR    2025130    131400   -9.8500 -136.4200      38.5        64       141        60
OIR    2025130    131400   -9.8500 -136.4300      38.3        64       142        60
OIR    2025130    131400   -9.8500 -136.4400      38.2        64       143        60
OIR    2025130    131400   -9.8500 -136.4500      38.0        64       143        60
OIR    2025130    131400   -9.8500 -136.4600      37.8        65       142        60
OIR    2025130    131400   -9.8500 -136.4700      37.8        64       142        60
OIR    2025130    131400   -9.8500 -136.4800      37.6        64       142        60
OIR    2025130    131400   -9.8500 -136.4900      37.1        62       140        60
OIR    2025130    131400   -9.8500 -136.5000      36.8        61       137        60
OIR    2025130    131400   -9.8500 -136.5100      36.5        60       141        60
OIR    2025130    131400   -9.8500 -136.5200      36.4        59       142        60
OIR    2025130    131400   -9.8500 -136.5300      36.3        59       142        60
OIR    2025130    131400   -9.8500 -136.5400      36.4        59       140        60
OIR    2025130    131400   -9.8500 -136.5500      36.6        58       136        60
OIR    2025130    131400   -9.8500 -136.5600      36.7        58       135        60
OIR    2025130    131400   -9.8500 -136.5700      36.8        58       134        60
OIR    2025130    131400   -9.8500 -136.5800      36.8        58       133        60
OIR    2025130    131400   -9.8500 -136.5900      36.9        58       132        60
OIR    2025130    131400   -9.8500 -136.6000      36.9        58       131        60
OIR    2025130    131400   -9.8500 -136.6100      37.0        58       130        60
OIR    2025130    131400   -9.8500 -136.6200      37.0        58       128        60
OIR    2025130    131400   -9.8500 -136.6300      36.9        58       127        60
OIR    2025130    131400   -9.8500 -136.6400      37.0        58       126        60
OIR    2025130    131400   -9.8500 -136.6500      36.9        58       126        60
OIR    2025130    131400   -9.8500 -136.6600      36.9        58       129        60
OIR    2025130    131400   -9.8500 -136.6700      36.7        58       132        60
OIR    2025130    131400   -9.8500 -136.6800      36.5        58       134        60
OIR    2025130    131400   -9.8500 -136.6900      36.3        58       136        60
OIR    2025130    131400   -9.8500 -136.7000      35.6        57       138        60
OIR    2025130    131400   -9.8500 -136.7100      34.3        55       138        60
OIR    2025130    131400   -9.8500 -136.7200      33.0        52       139        60
OIR    2025130    131400   -9.8500 -136.7300      32.8        50       140        60
OIR    2025130    131400   -9.8500 -136.7400      32.8        50       140        60
OIR    2025130    131400   -9.8500 -136.7500      32.8        50       139        60
OIR    2025130    131400   -9.8500 -136.7600      32.7        50       135        60
OIR    2025130    131400   -9.8500 -136.7700      32.7        50       130        60
OIR    2025130    131400   -9.8500 -136.7800      32.7        50       127        60
OIR    2025130    131400   -9.8500 -136.7900      32.7        50       126        60
OIR    2025130    131400   -9.8500 -136.8000      32.6        50       126        60
OIR    2025130    131400   -9.8500 -136.8100      32.1        50       127        60
OIR    2025130    131400   -9.8500 -136.8200      31.0        50       125        60
OIR    2025130    131400   -9.8500 -136.8300      30.4        50       121        60
OIR    2025130    131400   -9.8500 -136.8400      30.2        50       116        60
OIR    2025130    131400   -9.8500 -136.8500      30.0        49       112        60
OIR    2025130    131400   -9.8500 -136.8600      30.0        49       110        60
OIR    2025130    131400   -9.8500 -136.8700      30.0        49       109        60
OIR    2025130    131400   -9.8500 -136.8800      30.0        48       109        60
OIR    2025130    131400   -9.8500 -136.8900      30.0        48       107        60
OIR    2025130    131400   -9.8500 -136.9000      30.0        47       104        60
OIR    2025130    131400   -9.8500 -136.9100      30.0        47       103        60
OIR    2025130    131400   -9.8500 -136.9200      30.0        46       103        60
OIR    2025130    131400   -9.8500 -136.9300      30.0        46       103        60
OIR    2025130    131400   -9.8500 -136.9400      30.0        45       103        60
OIR    2025130    131400   -9.8500 -136.9500      30.0        44       104        60
OIR    2025130    131400   -9.8500 -136.9600      30.0        44       104        60
OIR    2025130    131400   -9.8500 -136.9700      30.0        43       105        60
OIR    2025130    131400   -9.8500 -136.9800      30.0        43       107        60
OIR    2025130    131400   -9.8500 -136.9900      30.0        43       109        60
OIR    2025130    131400   -9.8500 -137.0000      30.1        43       108        60
OIR    2025130    131400   -9.8500 -137.0100      30.1        43       107        60
OIR    2025130    131400   -9.8500 -137.0200      30.1        43       105        60
OIR    2025130    131400   -9.8500 -137.0300      30.2        43       104        60
OIR    2025130    131400   -9.8500 -137.0400      30.2        43       104        60
OIR    2025130    131400   -9.8500 -137.0500      30.3        43       103        60
OIR    2025130    131400   -9.8500 -137.0600      30.3        43       104        60
OIR    2025130    131400   -9.8500 -137.0700      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.0800      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.0900      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.1000      30.4        43       103        60
OIR    2025130    131400   -9.8500 -137.1100      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.1200      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.1300      30.4        43       104        60
OIR    2025130    131400   -9.8500 -137.1400      30.5        43       103        60
OIR    2025130    131400   -9.8500 -137.1500      30.5        43       103        60
OIR    2025130    131400   -9.8500 -137.1600      30.6        43       103        60
OIR    2025130    131400   -9.8500 -137.1700      30.8        43       103        60
OIR    2025130    131400   -9.8500 -137.1800      31.1        43       103        60
OIR    2025130    131400   -9.8500 -137.1900      31.4        44       103        60
OIR    2025130    131400   -9.8500 -137.2000      32.1        44       103        60
OIR    2025130    131400   -9.8500 -137.2100      33.7        45       103        60
OIR    2025130    131400   -9.8500 -137.2200      34.6        46       104        60
OIR    2025130    131400   -9.8500 -137.2300      35.3        47       104        60
OIR    2025130    131400   -9.8500 -137.2400      36.0        47       104        60
OIR    2025130    131400   -9.8500 -137.2500      36.4        48       103        60
OIR    2025130    131400   -9.8500 -137.2600      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.2700      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8500 -137.3700      36.5        48       103        60
OIR    2025130    131400   -9.8500 -137.3800      36.3        47       103        60
OIR    2025130    131400   -9.8500 -137.3900      35.3        46       103        60
OIR    2025130    131400   -9.8500 -137.4000      34.8        46       103        60
OIR    2025130    131400   -9.8500 -137.4100      34.4        45       103        60
OIR    2025130    131400   -9.8500 -137.4200      33.8        45       103        60
OIR    2025130    131400   -9.8500 -137.4300      33.4        44       103        60
OIR    2025130    131400   -9.8500 -137.4400      33.0        44       103        60
OIR    2025130    131400   -9.8500 -137.4500      32.8        43       103        60
OIR    2025130    131400   -9.8500 -137.4600      32.7        41       103        60
OIR    2025130    131400   -9.8500 -137.4700      32.6        40       103        60
OIR    2025130    131400   -9.8500 -137.4800      32.5        37       103        60
OIR    2025130    131400   -9.8500 -137.4900      32.6        34       103        60
OIR    2025130    131400   -9.8500 -137.5000      33.0        31       103        60
OIR    2025130    131400   -9.8500 -137.5100      33.7        26       103        60
OIR    2025130    131400   -9.8500 -137.5200      34.5        21       103        60
OIR    2025130    131400   -9.8500 -137.5300      35.0        18       103        60
OIR    2025130    131400   -9.8500 -137.5400      35.3        17       103        60
OIR    2025130    131400   -9.8500 -137.5500      35.4        16       103        60
OIR    2025130    131400   -9.8500 -137.5600      35.5        15       103        60
OIR    2025130    131400   -9.8500 -137.5700      35.6        15       103        60
OIR    2025130    131400   -9.8500 -137.5800      35.7        14       103        60
OIR    2025130    131400   -9.8500 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8500 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8500 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8500 -137.6200      35.9        14       103        60
OIR    2025130    131400   -9.8500 -137.6300      36.0        13       103        60
OIR    2025130    131400   -9.8500 -137.6400      36.1        13       103        60
OIR    2025130    131400   -9.8500 -137.6500      36.2        12       103        60
OIR    2025130    131400   -9.8500 -137.6600      36.4        11       103        60
OIR    2025130    131400   -9.8500 -137.6700      36.5        11       103        60
OIR    2025130    131400   -9.8500 -137.6800      36.6        10       103        60
OIR    2025130    131400   -9.8500 -137.6900      36.8        10       104        60
OIR    2025130    131400   -9.8500 -137.7000      36.9         9       105        60
OIR    2025130    131400   -9.8500 -137.7100      36.9         9       107        60
OIR    2025130    131400   -9.8500 -137.7200      36.9         9       109        60
OIR    2025130    131400   -9.8500 -137.7300      36.9         8       110        60
OIR    2025130    131400   -9.8500 -137.7400      36.9         8       110        60
OIR    2025130    131400   -9.8500 -137.7500      36.8         7       110        60
OIR    2025130    131400   -9.8500 -137.7600      36.0         4       108        60
OIR    2025130    131400   -9.8500 -137.7700      35.4         2       108        60
OIR    2025130    131400   -9.8500 -137.7800      35.1         1       107        60
OIR    2025130    131400   -9.8500 -137.7900      34.8       359       107        60
OIR    2025130    131400   -9.8500 -137.8000      34.4       358       107        60
OIR    2025130    131400   -9.8500 -137.8100      34.1       357       105        60
OIR    2025130    131400   -9.8500 -137.8200      33.9       356       104        60
OIR    2025130    131400   -9.8500 -137.8300      33.8       356       104        60
OIR    2025130    131400   -9.8500 -137.8400      33.6       355       103        60
OIR    2025130    131400   -9.8500 -137.8500      33.5       355       103        60
OIR    2025130    131400   -9.8500 -137.8600      33.4       354       103        60
OIR    2025130    131400   -9.8500 -137.8700      33.3       353       103        60
OIR    2025130    131400   -9.8500 -137.8800      33.2       353       103        60
OIR    2025130    131400   -9.8500 -137.8900      33.1       353       103        60
OIR    2025130    131400   -9.8500 -137.9000      33.0       353       104        60
OIR    2025130    131400   -9.8500 -137.9100      32.8       352       104        60
OIR    2025130    131400   -9.8500 -137.9200      32.4       352       107        60
OIR    2025130    131400   -9.8500 -137.9300      32.1       351       108        60
OIR    2025130    131400   -9.8500 -137.9400      31.9       351       108        60
OIR    2025130    131400   -9.8500 -137.9500      31.7       351       108        60
OIR    2025130    131400   -9.8500 -137.9600      31.6       350       107        60
OIR    2025130    131400   -9.8500 -137.9700      31.5       350       108        60
OIR    2025130    131400   -9.8500 -137.9800      31.4       350       110        60
OIR    2025130    131400   -9.8500 -137.9900      31.3       350       111        60
OIR    2025130    131400   -9.8500 -138.0000      31.3       350       112        60
OIR    2025130    131400   -9.8500 -138.0100      31.3       350       114        60
OIR    2025130    131400   -9.8500 -138.0200      31.2       349       116        60
OIR    2025130    131400   -9.8500 -138.0300      31.2       349       120        60
OIR    2025130    131400   -9.8500 -138.0400      31.2       349       123        60
OIR    2025130    131400   -9.8500 -138.0500      31.1       349       124        60
OIR    2025130    131400   -9.8500 -138.0600      31.1       349       125        60
OIR    2025130    131400   -9.8500 -138.0700      31.0       348       126        60
OIR    2025130    131400   -9.8500 -138.0800      30.6       347       128        60
OIR    2025130    131400   -9.8500 -138.0900      30.1       344       130        60
OIR    2025130    131400   -9.8500 -138.1000      29.8       341       132        60
OIR    2025130    131400   -9.8500 -138.1100      29.7       338       134        60
OIR    2025130    131400   -9.8500 -138.1200      29.7       336       136        60
OIR    2025130    131400   -9.8500 -138.1300      29.7       333       137        60
OIR    2025130    131400   -9.8500 -138.1400      29.7       332       136        60
OIR    2025130    131400   -9.8500 -138.1500      29.8       331       135        60
OIR    2025130    131400   -9.8500 -138.1600      29.8       330       136        60
OIR    2025130    131400   -9.8500 -138.1700      29.6       329       136        60
OIR    2025130    131400   -9.8500 -138.1800      29.2       328       139        60
OIR    2025130    131400   -9.8500 -138.1900      28.8       328       139        60
OIR    2025130    131400   -9.8500 -138.2000      28.4       328       138        60
OIR    2025130    131400   -9.8500 -138.2100      27.6       327       137        60
OIR    2025130    131400   -9.8500 -138.2200      26.5       328       135        60
OIR    2025130    131400   -9.8500 -138.2300      25.9       328       133        60
OIR    2025130    131400   -9.8500 -138.2400      25.5       328       130        60
OIR    2025130    131400   -9.8500 -138.2500      25.4       328       129        60
OIR    2025130    131400   -9.8500 -138.2600      25.4       328       128        60
OIR    2025130    131400   -9.8500 -138.2700      25.4       328       128        60
OIR    2025130    131400   -9.8500 -138.2800      25.4       328       128        60
OIR    2025130    131400   -9.8500 -138.2900      25.4       328       129        60
OIR    2025130    131400   -9.8500 -138.3000      25.4       328       131        60
OIR    2025130    131400   -9.8500 -138.3100      25.3       328       135        60
OIR    2025130    131400   -9.8500 -138.3200      25.3       328       136        60
OIR    2025130    131400   -9.8500 -138.3300      25.3       328       137        60
OIR    2025130    131400   -9.8500 -138.3400      25.3       328       138        60
OIR    2025130    131400   -9.8500 -138.3500      25.3       328       140        60
OIR    2025130    131400   -9.8500 -138.3600      25.3       328       140        60
OIR    2025130    131400   -9.8500 -138.3700      25.3       328       140        60
OIR    2025130    131400   -9.8500 -138.3800      25.3       328       139        60
OIR    2025130    131400   -9.8500 -138.3900      25.4       328       139        60
OIR    2025130    131400   -9.8500 -138.4000      25.4       328       141        60
OIR    2025130    131400   -9.8500 -138.4100      25.4       328       143        60
OIR    2025130    131400   -9.8500 -138.4200      25.4       328       143        60
OIR    2025130    131400   -9.8500 -138.4300      25.4       328       145        60
OIR    2025130    131400   -9.8500 -138.4400      25.4       328       148        60
OIR    2025130    131400   -9.8600 -136.1400      40.4        62       148        60
OIR    2025130    131400   -9.8600 -136.1500      40.6        62       146        60
OIR    2025130    131400   -9.8600 -136.1600      40.8        62       146        60
OIR    2025130    131400   -9.8600 -136.1700      41.1        62       146        60
OIR    2025130    131400   -9.8600 -136.1800      41.3        62       148        60
OIR    2025130    131400   -9.8600 -136.1900      41.5        62       149        60
OIR    2025130    131400   -9.8600 -136.2100      41.6        63       149        60
OIR    2025130    131400   -9.8600 -136.2200      41.6        63       144        60
OIR    2025130    131400   -9.8600 -136.2300      41.5        63       140        60
OIR    2025130    131400   -9.8600 -136.2400      41.5        63       137        60
OIR    2025130    131400   -9.8600 -136.2500      41.4        63       140        60
OIR    2025130    131400   -9.8600 -136.2600      41.3        63       143        60
OIR    2025130    131400   -9.8600 -136.2700      41.2        63       144        60
OIR    2025130    131400   -9.8600 -136.2800      40.8        62       145        60
OIR    2025130    131400   -9.8600 -136.2900      40.2        62       145        60
OIR    2025130    131400   -9.8600 -136.3000      39.7        61       146        60
OIR    2025130    131400   -9.8600 -136.3100      39.2        61       147        60
OIR    2025130    131400   -9.8600 -136.3500      38.7        61       146        60
OIR    2025130    131400   -9.8600 -136.3600      39.0        60       144        60
OIR    2025130    131400   -9.8600 -136.3700      39.1        61       143        60
OIR    2025130    131400   -9.8600 -136.3800      39.2        61       143        60
OIR    2025130    131400   -9.8600 -136.3900      39.2        61       143        60
OIR    2025130    131400   -9.8600 -136.4000      39.2        61       142        60
OIR    2025130    131400   -9.8600 -136.4100      39.0        61       141        60
OIR    2025130    131400   -9.8600 -136.4200      38.9        61       141        60
OIR    2025130    131400   -9.8600 -136.4300      38.8        62       141        60
OIR    2025130    131400   -9.8600 -136.4400      38.6        62       141        60
OIR    2025130    131400   -9.8600 -136.4500      38.4        62       141        60
OIR    2025130    131400   -9.8600 -136.4600      38.1        62       142        60
OIR    2025130    131400   -9.8600 -136.4700      37.8        62       142        60
OIR    2025130    131400   -9.8600 -136.4800      37.7        61       142        60
OIR    2025130    131400   -9.8600 -136.4900      37.2        60       139        60
OIR    2025130    131400   -9.8600 -136.5000      37.1        60       137        60
OIR    2025130    131400   -9.8600 -136.5100      36.8        59       143        60
OIR    2025130    131400   -9.8600 -136.5200      36.7        58       144        60
OIR    2025130    131400   -9.8600 -136.5300      36.7        58       141        60
OIR    2025130    131400   -9.8600 -136.5400      36.7        58       139        60
OIR    2025130    131400   -9.8600 -136.5500      36.8        58       135        60
OIR    2025130    131400   -9.8600 -136.5600      36.9        58       134        60
OIR    2025130    131400   -9.8600 -136.5700      36.9        58       133        60
OIR    2025130    131400   -9.8600 -136.5800      36.9        58       133        60
OIR    2025130    131400   -9.8600 -136.5900      36.9        58       133        60
OIR    2025130    131400   -9.8600 -136.6000      37.0        58       132        60
OIR    2025130    131400   -9.8600 -136.6100      37.0        58       131        60
OIR    2025130    131400   -9.8600 -136.6200      37.0        58       129        60
OIR    2025130    131400   -9.8600 -136.6300      37.0        58       129        60
OIR    2025130    131400   -9.8600 -136.6400      37.0        58       128        60
OIR    2025130    131400   -9.8600 -136.6500      36.9        58       129        60
OIR    2025130    131400   -9.8600 -136.6600      36.9        58       131        60
OIR    2025130    131400   -9.8600 -136.6700      36.8        58       132        60
OIR    2025130    131400   -9.8600 -136.6800      36.6        58       133        60
OIR    2025130    131400   -9.8600 -136.6900      36.1        57       135        60
OIR    2025130    131400   -9.8600 -136.7000      35.1        56       136        60
OIR    2025130    131400   -9.8600 -136.7100      33.9        54       138        60
OIR    2025130    131400   -9.8600 -136.7200      32.8        51       140        60
OIR    2025130    131400   -9.8600 -136.7300      32.7        50       140        60
OIR    2025130    131400   -9.8600 -136.7400      32.7        50       139        60
OIR    2025130    131400   -9.8600 -136.7500      32.8        50       137        60
OIR    2025130    131400   -9.8600 -136.7600      32.8        50       134        60
OIR    2025130    131400   -9.8600 -136.7700      32.8        50       127        60
OIR    2025130    131400   -9.8600 -136.7800      32.8        50       126        60
OIR    2025130    131400   -9.8600 -136.7900      32.9        50       126        60
OIR    2025130    131400   -9.8600 -136.8000      32.9        50       128        60
OIR    2025130    131400   -9.8600 -136.8100      32.8        50       129        60
OIR    2025130    131400   -9.8600 -136.8200      32.4        50       127        60
OIR    2025130    131400   -9.8600 -136.8300      31.4        50       124        60
OIR    2025130    131400   -9.8600 -136.8400      30.8        49       117        60
OIR    2025130    131400   -9.8600 -136.8500      30.5        49       113        60
OIR    2025130    131400   -9.8600 -136.8600      30.4        49       111        60
OIR    2025130    131400   -9.8600 -136.8700      30.3        49       110        60
OIR    2025130    131400   -9.8600 -136.8800      30.2        48       110        60
OIR    2025130    131400   -9.8600 -136.8900      30.2        48       107        60
OIR    2025130    131400   -9.8600 -136.9000      30.2        47       104        60
OIR    2025130    131400   -9.8600 -136.9100      30.2        47       103        60
OIR    2025130    131400   -9.8600 -136.9200      30.2        46       103        60
OIR    2025130    131400   -9.8600 -136.9300      30.2        46       103        60
OIR    2025130    131400   -9.8600 -136.9400      30.1        44       103        60
OIR    2025130    131400   -9.8600 -136.9500      30.0        44       103        60
OIR    2025130    131400   -9.8600 -136.9600      30.0        43       103        60
OIR    2025130    131400   -9.8600 -136.9700      30.0        43       104        60
OIR    2025130    131400   -9.8600 -136.9800      30.0        43       107        60
OIR    2025130    131400   -9.8600 -136.9900      30.0        43       109        60
OIR    2025130    131400   -9.8600 -137.0000      30.1        43       109        60
OIR    2025130    131400   -9.8600 -137.0100      30.1        43       108        60
OIR    2025130    131400   -9.8600 -137.0200      30.1        43       107        60
OIR    2025130    131400   -9.8600 -137.0300      30.2        43       104        60
OIR    2025130    131400   -9.8600 -137.0400      30.2        43       104        60
OIR    2025130    131400   -9.8600 -137.0500      30.3        43       103        60
OIR    2025130    131400   -9.8600 -137.0600      30.3        43       103        60
OIR    2025130    131400   -9.8600 -137.0700      30.3        43       103        60
OIR    2025130    131400   -9.8600 -137.0800      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.0900      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.1000      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.1100      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.1200      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.1300      30.4        43       104        60
OIR    2025130    131400   -9.8600 -137.1400      30.4        43       103        60
OIR    2025130    131400   -9.8600 -137.1500      30.4        43       103        60
OIR    2025130    131400   -9.8600 -137.1600      30.5        43       104        60
OIR    2025130    131400   -9.8600 -137.1700      30.6        43       104        60
OIR    2025130    131400   -9.8600 -137.1800      30.8        43       104        60
OIR    2025130    131400   -9.8600 -137.1900      31.0        43       103        60
OIR    2025130    131400   -9.8600 -137.2000      31.6        44       103        60
OIR    2025130    131400   -9.8600 -137.2100      33.3        45       103        60
OIR    2025130    131400   -9.8600 -137.2200      34.1        46       104        60
OIR    2025130    131400   -9.8600 -137.2300      34.8        46       104        60
OIR    2025130    131400   -9.8600 -137.2400      35.7        47       104        60
OIR    2025130    131400   -9.8600 -137.2500      36.1        47       103        60
OIR    2025130    131400   -9.8600 -137.2600      36.5        48       103        60
OIR    2025130    131400   -9.8600 -137.2700      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3600      36.6        48       103        60
OIR    2025130    131400   -9.8600 -137.3700      36.4        47       103        60
OIR    2025130    131400   -9.8600 -137.3800      36.2        47       103        60
OIR    2025130    131400   -9.8600 -137.3900      35.1        46       103        60
OIR    2025130    131400   -9.8600 -137.4000      34.7        45       103        60
OIR    2025130    131400   -9.8600 -137.4100      34.3        45       103        60
OIR    2025130    131400   -9.8600 -137.4200      33.7        44       103        60
OIR    2025130    131400   -9.8600 -137.4300      33.4        43       103        60
OIR    2025130    131400   -9.8600 -137.4400      33.0        43       103        60
OIR    2025130    131400   -9.8600 -137.4500      32.6        41       103        60
OIR    2025130    131400   -9.8600 -137.4600      32.7        39       103        60
OIR    2025130    131400   -9.8600 -137.4700      32.7        37       103        60
OIR    2025130    131400   -9.8600 -137.4800      32.7        34       103        60
OIR    2025130    131400   -9.8600 -137.4900      32.9        31       103        60
OIR    2025130    131400   -9.8600 -137.5000      33.5        27       103        60
OIR    2025130    131400   -9.8600 -137.5100      34.3        22       103        60
OIR    2025130    131400   -9.8600 -137.5200      34.8        19       103        60
OIR    2025130    131400   -9.8600 -137.5300      35.2        17       103        60
OIR    2025130    131400   -9.8600 -137.5400      35.4        16       103        60
OIR    2025130    131400   -9.8600 -137.5500      35.5        15       103        60
OIR    2025130    131400   -9.8600 -137.5600      35.6        15       103        60
OIR    2025130    131400   -9.8600 -137.5700      35.6        15       103        60
OIR    2025130    131400   -9.8600 -137.5800      35.7        14       103        60
OIR    2025130    131400   -9.8600 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8600 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8600 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8600 -137.6200      35.9        14       103        60
OIR    2025130    131400   -9.8600 -137.6300      36.0        13       103        60
OIR    2025130    131400   -9.8600 -137.6400      36.1        13       103        60
OIR    2025130    131400   -9.8600 -137.6500      36.2        12       103        60
OIR    2025130    131400   -9.8600 -137.6600      36.3        11       103        60
OIR    2025130    131400   -9.8600 -137.6700      36.4        11       103        60
OIR    2025130    131400   -9.8600 -137.6800      36.5        10       103        60
OIR    2025130    131400   -9.8600 -137.6900      36.6        10       103        60
OIR    2025130    131400   -9.8600 -137.7000      36.7         9       104        60
OIR    2025130    131400   -9.8600 -137.7100      36.7         9       104        60
OIR    2025130    131400   -9.8600 -137.7200      36.7         9       105        60
OIR    2025130    131400   -9.8600 -137.7300      36.7         8       107        60
OIR    2025130    131400   -9.8600 -137.7400      36.7         8       108        60
OIR    2025130    131400   -9.8600 -137.7500      36.5         7       109        60
OIR    2025130    131400   -9.8600 -137.7600      35.9         5       109        60
OIR    2025130    131400   -9.8600 -137.7700      35.5         3       108        60
OIR    2025130    131400   -9.8600 -137.7800      35.1         1       107        60
OIR    2025130    131400   -9.8600 -137.7900      34.7       359       105        60
OIR    2025130    131400   -9.8600 -137.8000      34.3       358       105        60
OIR    2025130    131400   -9.8600 -137.8100      34.0       357       105        60
OIR    2025130    131400   -9.8600 -137.8200      33.8       356       104        60
OIR    2025130    131400   -9.8600 -137.8300      33.7       356       104        60
OIR    2025130    131400   -9.8600 -137.8400      33.6       355       103        60
OIR    2025130    131400   -9.8600 -137.8500      33.4       355       103        60
OIR    2025130    131400   -9.8600 -137.8600      33.3       354       103        60
OIR    2025130    131400   -9.8600 -137.8700      33.2       353       103        60
OIR    2025130    131400   -9.8600 -137.8800      33.1       353       103        60
OIR    2025130    131400   -9.8600 -137.8900      33.1       353       104        60
OIR    2025130    131400   -9.8600 -137.9000      32.9       352       104        60
OIR    2025130    131400   -9.8600 -137.9100      32.6       352       105        60
OIR    2025130    131400   -9.8600 -137.9200      32.3       352       107        60
OIR    2025130    131400   -9.8600 -137.9300      32.0       351       108        60
OIR    2025130    131400   -9.8600 -137.9400      31.8       351       108        60
OIR    2025130    131400   -9.8600 -137.9500      31.6       351       108        60
OIR    2025130    131400   -9.8600 -137.9600      31.5       350       108        60
OIR    2025130    131400   -9.8600 -137.9700      31.4       350       109        60
OIR    2025130    131400   -9.8600 -137.9800      31.4       350       111        60
OIR    2025130    131400   -9.8600 -137.9900      31.3       350       112        60
OIR    2025130    131400   -9.8600 -138.0000      31.3       350       113        60
OIR    2025130    131400   -9.8600 -138.0100      31.2       350       116        60
OIR    2025130    131400   -9.8600 -138.0200      31.2       349       119        60
OIR    2025130    131400   -9.8600 -138.0300      31.2       349       122        60
OIR    2025130    131400   -9.8600 -138.0400      31.2       349       124        60
OIR    2025130    131400   -9.8600 -138.0500      31.1       349       124        60
OIR    2025130    131400   -9.8600 -138.0600      31.1       349       124        60
OIR    2025130    131400   -9.8600 -138.0700      31.0       348       125        60
OIR    2025130    131400   -9.8600 -138.0800      30.7       347       127        60
OIR    2025130    131400   -9.8600 -138.0900      30.3       345       130        60
OIR    2025130    131400   -9.8600 -138.1000      30.0       342       132        60
OIR    2025130    131400   -9.8600 -138.1100      29.9       339       134        60
OIR    2025130    131400   -9.8600 -138.1200      29.9       337       135        60
OIR    2025130    131400   -9.8600 -138.1300      30.0       335       136        60
OIR    2025130    131400   -9.8600 -138.1400      30.1       333       136        60
OIR    2025130    131400   -9.8600 -138.1500      30.0       331       136        60
OIR    2025130    131400   -9.8600 -138.1600      29.8       331       138        60
OIR    2025130    131400   -9.8600 -138.1700      29.6       330       140        60
OIR    2025130    131400   -9.8600 -138.1800      29.4       329       142        60
OIR    2025130    131400   -9.8600 -138.1900      28.9       329       142        60
OIR    2025130    131400   -9.8600 -138.2000      28.2       328       141        60
OIR    2025130    131400   -9.8600 -138.2100      27.2       328       140        60
OIR    2025130    131400   -9.8600 -138.2200      26.2       328       138        60
OIR    2025130    131400   -9.8600 -138.2300      25.7       328       136        60
OIR    2025130    131400   -9.8600 -138.2400      25.5       328       133        60
OIR    2025130    131400   -9.8600 -138.2500      25.4       328       131        60
OIR    2025130    131400   -9.8600 -138.2600      25.4       328       130        60
OIR    2025130    131400   -9.8600 -138.2700      25.4       328       130        60
OIR    2025130    131400   -9.8600 -138.2800      25.4       328       130        60
OIR    2025130    131400   -9.8600 -138.2900      25.4       328       131        60
OIR    2025130    131400   -9.8600 -138.3000      25.4       328       133        60
OIR    2025130    131400   -9.8600 -138.3100      25.3       328       136        60
OIR    2025130    131400   -9.8600 -138.3200      25.3       328       136        60
OIR    2025130    131400   -9.8600 -138.3300      25.3       328       137        60
OIR    2025130    131400   -9.8600 -138.3400      25.3       328       138        60
OIR    2025130    131400   -9.8600 -138.3500      25.3       328       139        60
OIR    2025130    131400   -9.8600 -138.3600      25.3       328       139        60
OIR    2025130    131400   -9.8600 -138.3700      25.3       328       139        60
OIR    2025130    131400   -9.8600 -138.3800      25.4       328       139        60
OIR    2025130    131400   -9.8600 -138.3900      25.4       328       139        60
OIR    2025130    131400   -9.8600 -138.4000      25.4       328       140        60
OIR    2025130    131400   -9.8600 -138.4100      25.4       328       140        60
OIR    2025130    131400   -9.8600 -138.4200      25.4       329       140        60
OIR    2025130    131400   -9.8600 -138.4300      25.5       329       143        60
OIR    2025130    131400   -9.8600 -138.4400      25.5       329       146        60
OIR    2025130    131400   -9.8700 -136.1400      40.4        62       148        60
OIR    2025130    131400   -9.8700 -136.1500      40.6        62       145        60
OIR    2025130    131400   -9.8700 -136.1600      40.8        62       144        60
OIR    2025130    131400   -9.8700 -136.1700      41.0        62       144        60
OIR    2025130    131400   -9.8700 -136.1800      41.2        62       144        60
OIR    2025130    131400   -9.8700 -136.1900      41.4        62       145        60
OIR    2025130    131400   -9.8700 -136.2000      41.5        62       147        60
OIR    2025130    131400   -9.8700 -136.2100      41.5        62       146        60
OIR    2025130    131400   -9.8700 -136.2200      41.5        62       144        60
OIR    2025130    131400   -9.8700 -136.2300      41.5        63       142        60
OIR    2025130    131400   -9.8700 -136.2400      41.5        63       139        60
OIR    2025130    131400   -9.8700 -136.2500      41.4        63       141        60
OIR    2025130    131400   -9.8700 -136.2600      41.3        63       144        60
OIR    2025130    131400   -9.8700 -136.2700      41.1        62       145        60
OIR    2025130    131400   -9.8700 -136.2800      40.8        62       146        60
OIR    2025130    131400   -9.8700 -136.2900      40.2        61       145        60
OIR    2025130    131400   -9.8700 -136.3000      39.9        61       145        60
OIR    2025130    131400   -9.8700 -136.3100      39.6        61       146        60
OIR    2025130    131400   -9.8700 -136.3500      38.9        60       145        60
OIR    2025130    131400   -9.8700 -136.3600      39.1        60       144        60
OIR    2025130    131400   -9.8700 -136.3700      39.3        60       143        60
OIR    2025130    131400   -9.8700 -136.3800      39.3        60       143        60
OIR    2025130    131400   -9.8700 -136.3900      39.3        60       143        60
OIR    2025130    131400   -9.8700 -136.4000      39.3        60       142        60
OIR    2025130    131400   -9.8700 -136.4100      39.3        60       142        60
OIR    2025130    131400   -9.8700 -136.4200      39.2        60       143        60
OIR    2025130    131400   -9.8700 -136.4300      39.0        60       143        60
OIR    2025130    131400   -9.8700 -136.4400      38.8        61       142        60
OIR    2025130    131400   -9.8700 -136.4500      38.6        60       141        60
OIR    2025130    131400   -9.8700 -136.4600      38.2        60       142        60
OIR    2025130    131400   -9.8700 -136.4700      37.9        60       142        60
OIR    2025130    131400   -9.8700 -136.4800      37.6        59       142        60
OIR    2025130    131400   -9.8700 -136.4900      37.3        59       140        60
OIR    2025130    131400   -9.8700 -136.5000      37.1        58       138        60
OIR    2025130    131400   -9.8700 -136.5100      36.9        58       141        60
OIR    2025130    131400   -9.8700 -136.5200      36.8        58       141        60
OIR    2025130    131400   -9.8700 -136.5300      36.8        58       140        60
OIR    2025130    131400   -9.8700 -136.5400      36.8        58       138        60
OIR    2025130    131400   -9.8700 -136.5500      36.9        58       135        60
OIR    2025130    131400   -9.8700 -136.5600      36.9        58       133        60
OIR    2025130    131400   -9.8700 -136.5700      36.9        58       132        60
OIR    2025130    131400   -9.8700 -136.5800      37.0        58       132        60
OIR    2025130    131400   -9.8700 -136.5900      37.0        58       131        60
OIR    2025130    131400   -9.8700 -136.6000      37.0        58       130        60
OIR    2025130    131400   -9.8700 -136.6100      37.0        58       129        60
OIR    2025130    131400   -9.8700 -136.6200      37.0        58       128        60
OIR    2025130    131400   -9.8700 -136.6300      37.0        58       128        60
OIR    2025130    131400   -9.8700 -136.6400      37.0        58       128        60
OIR    2025130    131400   -9.8700 -136.6500      37.0        58       128        60
OIR    2025130    131400   -9.8700 -136.6600      36.9        58       129        60
OIR    2025130    131400   -9.8700 -136.6700      36.8        58       130        60
OIR    2025130    131400   -9.8700 -136.6800      36.5        58       131        60
OIR    2025130    131400   -9.8700 -136.6900      35.8        57       133        60
OIR    2025130    131400   -9.8700 -136.7000      34.4        55       134        60
OIR    2025130    131400   -9.8700 -136.7100      33.6        53       138        60
OIR    2025130    131400   -9.8700 -136.7200      32.9        51       141        60
OIR    2025130    131400   -9.8700 -136.7300      32.7        50       139        60
OIR    2025130    131400   -9.8700 -136.7400      32.7        50       137        60
OIR    2025130    131400   -9.8700 -136.7500      32.8        50       135        60
OIR    2025130    131400   -9.8700 -136.7600      32.8        50       131        60
OIR    2025130    131400   -9.8700 -136.7700      32.8        50       125        60
OIR    2025130    131400   -9.8700 -136.7800      32.9        50       124        60
OIR    2025130    131400   -9.8700 -136.7900      32.9        50       124        60
OIR    2025130    131400   -9.8700 -136.8000      32.9        50       126        60
OIR    2025130    131400   -9.8700 -136.8100      32.9        50       127        60
OIR    2025130    131400   -9.8700 -136.8200      32.9        50       126        60
OIR    2025130    131400   -9.8700 -136.8300      32.4        50       124        60
OIR    2025130    131400   -9.8700 -136.8400      31.4        49       122        60
OIR    2025130    131400   -9.8700 -136.8500      30.7        49       119        60
OIR    2025130    131400   -9.8700 -136.8600      30.5        49       116        60
OIR    2025130    131400   -9.8700 -136.8700      30.5        49       114        60
OIR    2025130    131400   -9.8700 -136.8800      30.4        48       111        60
OIR    2025130    131400   -9.8700 -136.8900      30.4        48       107        60
OIR    2025130    131400   -9.8700 -136.9000      30.4        47       104        60
OIR    2025130    131400   -9.8700 -136.9100      30.4        47       103        60
OIR    2025130    131400   -9.8700 -136.9200      30.4        46       103        60
OIR    2025130    131400   -9.8700 -136.9300      30.3        45       103        60
OIR    2025130    131400   -9.8700 -136.9400      30.2        44       103        60
OIR    2025130    131400   -9.8700 -136.9500      30.1        43       103        60
OIR    2025130    131400   -9.8700 -136.9600      30.0        43       103        60
OIR    2025130    131400   -9.8700 -136.9700      30.0        43       104        60
OIR    2025130    131400   -9.8700 -136.9800      30.0        43       107        60
OIR    2025130    131400   -9.8700 -136.9900      30.0        43       109        60
OIR    2025130    131400   -9.8700 -137.0000      30.1        43       109        60
OIR    2025130    131400   -9.8700 -137.0100      30.1        43       109        60
OIR    2025130    131400   -9.8700 -137.0200      30.1        43       107        60
OIR    2025130    131400   -9.8700 -137.0300      30.2        43       105        60
OIR    2025130    131400   -9.8700 -137.0400      30.2        43       104        60
OIR    2025130    131400   -9.8700 -137.0500      30.2        43       103        60
OIR    2025130    131400   -9.8700 -137.0600      30.3        43       103        60
OIR    2025130    131400   -9.8700 -137.0700      30.3        43       103        60
OIR    2025130    131400   -9.8700 -137.0800      30.3        43       104        60
OIR    2025130    131400   -9.8700 -137.0900      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1000      30.4        43       105        60
OIR    2025130    131400   -9.8700 -137.1100      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1200      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1300      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1400      30.4        43       103        60
OIR    2025130    131400   -9.8700 -137.1500      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1600      30.4        43       104        60
OIR    2025130    131400   -9.8700 -137.1700      30.5        43       104        60
OIR    2025130    131400   -9.8700 -137.1800      30.6        43       104        60
OIR    2025130    131400   -9.8700 -137.1900      30.8        43       104        60
OIR    2025130    131400   -9.8700 -137.2000      31.2        43       103        60
OIR    2025130    131400   -9.8700 -137.2100      33.0        45       103        60
OIR    2025130    131400   -9.8700 -137.2200      33.7        46       104        60
OIR    2025130    131400   -9.8700 -137.2300      34.1        46       105        60
OIR    2025130    131400   -9.8700 -137.2400      35.2        47       105        60
OIR    2025130    131400   -9.8700 -137.2500      35.7        47       103        60
OIR    2025130    131400   -9.8700 -137.2600      36.2        47       103        60
OIR    2025130    131400   -9.8700 -137.2700      36.5        48       103        60
OIR    2025130    131400   -9.8700 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8700 -137.3600      36.5        47       103        60
OIR    2025130    131400   -9.8700 -137.3700      36.4        47       103        60
OIR    2025130    131400   -9.8700 -137.3800      36.0        47       103        60
OIR    2025130    131400   -9.8700 -137.3900      35.0        45       103        60
OIR    2025130    131400   -9.8700 -137.4000      34.6        44       103        60
OIR    2025130    131400   -9.8700 -137.4100      34.1        44       103        60
OIR    2025130    131400   -9.8700 -137.4200      33.6        43       103        60
OIR    2025130    131400   -9.8700 -137.4300      33.2        42       103        60
OIR    2025130    131400   -9.8700 -137.4400      32.9        40       103        60
OIR    2025130    131400   -9.8700 -137.4500      32.5        38       103        60
OIR    2025130    131400   -9.8700 -137.4600      32.6        36       103        60
OIR    2025130    131400   -9.8700 -137.4700      32.8        34       103        60
OIR    2025130    131400   -9.8700 -137.4800      33.0        32       103        60
OIR    2025130    131400   -9.8700 -137.4900      33.3        29       103        60
OIR    2025130    131400   -9.8700 -137.5000      33.8        24       103        60
OIR    2025130    131400   -9.8700 -137.5100      34.5        20       103        60
OIR    2025130    131400   -9.8700 -137.5200      34.9        18       103        60
OIR    2025130    131400   -9.8700 -137.5300      35.2        17       103        60
OIR    2025130    131400   -9.8700 -137.5400      35.4        16       103        60
OIR    2025130    131400   -9.8700 -137.5500      35.5        15       103        60
OIR    2025130    131400   -9.8700 -137.5600      35.6        15       103        60
OIR    2025130    131400   -9.8700 -137.5700      35.6        14       103        60
OIR    2025130    131400   -9.8700 -137.5800      35.8        14       103        60
OIR    2025130    131400   -9.8700 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8700 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8700 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8700 -137.6200      35.9        13       103        60
OIR    2025130    131400   -9.8700 -137.6300      36.0        13       103        60
OIR    2025130    131400   -9.8700 -137.6400      36.1        13       103        60
OIR    2025130    131400   -9.8700 -137.6500      36.2        12       103        60
OIR    2025130    131400   -9.8700 -137.6600      36.2        11       103        60
OIR    2025130    131400   -9.8700 -137.6700      36.3        11       103        60
OIR    2025130    131400   -9.8700 -137.6800      36.4        10       103        60
OIR    2025130    131400   -9.8700 -137.6900      36.5        10       103        60
OIR    2025130    131400   -9.8700 -137.7000      36.5         9       103        60
OIR    2025130    131400   -9.8700 -137.7100      36.5         9       103        60
OIR    2025130    131400   -9.8700 -137.7200      36.5         9       104        60
OIR    2025130    131400   -9.8700 -137.7300      36.5         9       104        60
OIR    2025130    131400   -9.8700 -137.7400      36.4         8       105        60
OIR    2025130    131400   -9.8700 -137.7500      36.1         7       107        60
OIR    2025130    131400   -9.8700 -137.7600      35.6         5       107        60
OIR    2025130    131400   -9.8700 -137.7700      35.3         3       107        60
OIR    2025130    131400   -9.8700 -137.7800      34.9         1       105        60
OIR    2025130    131400   -9.8700 -137.7900      34.5       359       105        60
OIR    2025130    131400   -9.8700 -137.8000      34.1       358       105        60
OIR    2025130    131400   -9.8700 -137.8100      33.8       357       104        60
OIR    2025130    131400   -9.8700 -137.8200      33.6       356       104        60
OIR    2025130    131400   -9.8700 -137.8300      33.5       356       103        60
OIR    2025130    131400   -9.8700 -137.8400      33.4       355       103        60
OIR    2025130    131400   -9.8700 -137.8500      33.3       355       103        60
OIR    2025130    131400   -9.8700 -137.8600      33.2       354       103        60
OIR    2025130    131400   -9.8700 -137.8700      33.1       353       103        60
OIR    2025130    131400   -9.8700 -137.8800      33.0       353       104        60
OIR    2025130    131400   -9.8700 -137.8900      32.9       353       105        60
OIR    2025130    131400   -9.8700 -137.9000      32.7       352       107        60
OIR    2025130    131400   -9.8700 -137.9100      32.4       352       108        60
OIR    2025130    131400   -9.8700 -137.9200      32.1       352       107        60
OIR    2025130    131400   -9.8700 -137.9300      31.9       351       108        60
OIR    2025130    131400   -9.8700 -137.9400      31.7       351       109        60
OIR    2025130    131400   -9.8700 -137.9500      31.5       351       109        60
OIR    2025130    131400   -9.8700 -137.9600      31.4       350       109        60
OIR    2025130    131400   -9.8700 -137.9700      31.4       350       109        60
OIR    2025130    131400   -9.8700 -137.9800      31.3       350       112        60
OIR    2025130    131400   -9.8700 -137.9900      31.3       350       114        60
OIR    2025130    131400   -9.8700 -138.0000      31.3       350       116        60
OIR    2025130    131400   -9.8700 -138.0100      31.2       350       119        60
OIR    2025130    131400   -9.8700 -138.0200      31.2       349       122        60
OIR    2025130    131400   -9.8700 -138.0300      31.2       349       123        60
OIR    2025130    131400   -9.8700 -138.0400      31.2       349       123        60
OIR    2025130    131400   -9.8700 -138.0500      31.1       349       123        60
OIR    2025130    131400   -9.8700 -138.0600      31.1       349       122        60
OIR    2025130    131400   -9.8700 -138.0700      31.0       348       124        60
OIR    2025130    131400   -9.8700 -138.0800      30.8       347       127        60
OIR    2025130    131400   -9.8700 -138.0900      30.5       345       130        60
OIR    2025130    131400   -9.8700 -138.1000      30.2       343       132        60
OIR    2025130    131400   -9.8700 -138.1100      30.1       340       134        60
OIR    2025130    131400   -9.8700 -138.1200      30.1       338       135        60
OIR    2025130    131400   -9.8700 -138.1300      30.2       336       136        60
OIR    2025130    131400   -9.8700 -138.1400      30.2       334       138        60
OIR    2025130    131400   -9.8700 -138.1500      30.0       333       140        60
OIR    2025130    131400   -9.8700 -138.1600      29.9       332       143        60
OIR    2025130    131400   -9.8700 -138.1700      29.7       331       146        60
OIR    2025130    131400   -9.8700 -138.1800      29.3       330       146        60
OIR    2025130    131400   -9.8700 -138.1900      28.7       329       145        60
OIR    2025130    131400   -9.8700 -138.2000      27.8       329       144        60
OIR    2025130    131400   -9.8700 -138.2100      26.9       329       143        60
OIR    2025130    131400   -9.8700 -138.2200      26.0       328       142        60
OIR    2025130    131400   -9.8700 -138.2300      25.6       328       139        60
OIR    2025130    131400   -9.8700 -138.2400      25.4       328       136        60
OIR    2025130    131400   -9.8700 -138.2500      25.4       328       133        60
OIR    2025130    131400   -9.8700 -138.2600      25.4       328       131        60
OIR    2025130    131400   -9.8700 -138.2700      25.4       328       130        60
OIR    2025130    131400   -9.8700 -138.2800      25.4       328       131        60
OIR    2025130    131400   -9.8700 -138.2900      25.4       328       133        60
OIR    2025130    131400   -9.8700 -138.3000      25.4       328       135        60
OIR    2025130    131400   -9.8700 -138.3100      25.4       328       137        60
OIR    2025130    131400   -9.8700 -138.3200      25.3       328       137        60
OIR    2025130    131400   -9.8700 -138.3300      25.3       328       137        60
OIR    2025130    131400   -9.8700 -138.3400      25.3       328       138        60
OIR    2025130    131400   -9.8700 -138.3500      25.3       328       138        60
OIR    2025130    131400   -9.8700 -138.3600      25.3       328       138        60
OIR    2025130    131400   -9.8700 -138.3700      25.4       328       139        60
OIR    2025130    131400   -9.8700 -138.3800      25.4       328       139        60
OIR    2025130    131400   -9.8700 -138.3900      25.4       328       139        60
OIR    2025130    131400   -9.8700 -138.4000      25.4       328       138        60
OIR    2025130    131400   -9.8700 -138.4100      25.4       329       138        60
OIR    2025130    131400   -9.8700 -138.4200      25.5       329       138        60
OIR    2025130    131400   -9.8700 -138.4300      25.5       329       141        60
OIR    2025130    131400   -9.8700 -138.4400      25.5       329       144        60
OIR    2025130    131400   -9.8700 -138.4500      25.5       329       148        60
OIR    2025130    131400   -9.8800 -136.1400      40.3        61       148        60
OIR    2025130    131400   -9.8800 -136.1500      40.5        61       144        60
OIR    2025130    131400   -9.8800 -136.1600      40.8        61       143        60
OIR    2025130    131400   -9.8800 -136.1700      41.0        61       142        60
OIR    2025130    131400   -9.8800 -136.1800      41.2        62       142        60
OIR    2025130    131400   -9.8800 -136.1900      41.3        62       142        60
OIR    2025130    131400   -9.8800 -136.2000      41.4        62       145        60
OIR    2025130    131400   -9.8800 -136.2100      41.5        62       145        60
OIR    2025130    131400   -9.8800 -136.2200      41.5        62       145        60
OIR    2025130    131400   -9.8800 -136.2300      41.4        62       144        60
OIR    2025130    131400   -9.8800 -136.2400      41.4        62       142        60
OIR    2025130    131400   -9.8800 -136.2500      41.2        62       143        60
OIR    2025130    131400   -9.8800 -136.2600      41.2        62       145        60
OIR    2025130    131400   -9.8800 -136.2700      41.0        62       145        60
OIR    2025130    131400   -9.8800 -136.2800      40.7        61       145        60
OIR    2025130    131400   -9.8800 -136.2900      40.3        61       145        60
OIR    2025130    131400   -9.8800 -136.3000      40.1        61       145        60
OIR    2025130    131400   -9.8800 -136.3100      39.8        60       146        60
OIR    2025130    131400   -9.8800 -136.3500      39.2        59       145        60
OIR    2025130    131400   -9.8800 -136.3600      39.3        59       144        60
OIR    2025130    131400   -9.8800 -136.3700      39.4        59       144        60
OIR    2025130    131400   -9.8800 -136.3800      39.5        58       143        60
OIR    2025130    131400   -9.8800 -136.3900      39.6        58       142        60
OIR    2025130    131400   -9.8800 -136.4000      39.6        58       142        60
OIR    2025130    131400   -9.8800 -136.4100      39.6        58       143        60
OIR    2025130    131400   -9.8800 -136.4200      39.6        58       144        60
OIR    2025130    131400   -9.8800 -136.4300      39.4        58       144        60
OIR    2025130    131400   -9.8800 -136.4400      39.0        59       142        60
OIR    2025130    131400   -9.8800 -136.4500      38.6        59       141        60
OIR    2025130    131400   -9.8800 -136.4600      38.2        59       141        60
OIR    2025130    131400   -9.8800 -136.4700      37.8        58       141        60
OIR    2025130    131400   -9.8800 -136.4800      37.5        58       141        60
OIR    2025130    131400   -9.8800 -136.4900      37.3        58       140        60
OIR    2025130    131400   -9.8800 -136.5000      37.1        58       139        60
OIR    2025130    131400   -9.8800 -136.5100      37.0        58       140        60
OIR    2025130    131400   -9.8800 -136.5200      36.9        58       140        60
OIR    2025130    131400   -9.8800 -136.5300      36.9        58       138        60
OIR    2025130    131400   -9.8800 -136.5400      36.9        58       137        60
OIR    2025130    131400   -9.8800 -136.5500      36.9        58       135        60
OIR    2025130    131400   -9.8800 -136.5600      36.9        58       133        60
OIR    2025130    131400   -9.8800 -136.5700      37.0        58       132        60
OIR    2025130    131400   -9.8800 -136.5800      37.0        58       131        60
OIR    2025130    131400   -9.8800 -136.5900      37.0        58       130        60
OIR    2025130    131400   -9.8800 -136.6000      37.0        58       129        60
OIR    2025130    131400   -9.8800 -136.6100      37.0        58       127        60
OIR    2025130    131400   -9.8800 -136.6200      37.0        58       128        60
OIR    2025130    131400   -9.8800 -136.6300      37.0        58       128        60
OIR    2025130    131400   -9.8800 -136.6400      37.0        58       129        60
OIR    2025130    131400   -9.8800 -136.6500      37.0        58       129        60
OIR    2025130    131400   -9.8800 -136.6600      36.9        58       129        60
OIR    2025130    131400   -9.8800 -136.6700      36.8        58       129        60
OIR    2025130    131400   -9.8800 -136.6800      36.5        57       131        60
OIR    2025130    131400   -9.8800 -136.6900      35.5        56       132        60
OIR    2025130    131400   -9.8800 -136.7000      33.9        54       132        60
OIR    2025130    131400   -9.8800 -136.7100      33.3        52       137        60
OIR    2025130    131400   -9.8800 -136.7200      33.0        51       139        60
OIR    2025130    131400   -9.8800 -136.7300      32.7        50       135        60
OIR    2025130    131400   -9.8800 -136.7400      32.8        50       133        60
OIR    2025130    131400   -9.8800 -136.7500      32.8        50       131        60
OIR    2025130    131400   -9.8800 -136.7600      32.8        50       129        60
OIR    2025130    131400   -9.8800 -136.7700      32.9        50       124        60
OIR    2025130    131400   -9.8800 -136.7800      32.9        50       123        60
OIR    2025130    131400   -9.8800 -136.7900      32.9        50       123        60
OIR    2025130    131400   -9.8800 -136.8000      33.0        50       124        60
OIR    2025130    131400   -9.8800 -136.8100      33.0        50       126        60
OIR    2025130    131400   -9.8800 -136.8200      33.0        50       127        60
OIR    2025130    131400   -9.8800 -136.8300      32.9        50       127        60
OIR    2025130    131400   -9.8800 -136.8400      32.3        50       128        60
OIR    2025130    131400   -9.8800 -136.8500      31.0        49       126        60
OIR    2025130    131400   -9.8800 -136.8600      30.7        49       124        60
OIR    2025130    131400   -9.8800 -136.8700      30.6        49       119        60
OIR    2025130    131400   -9.8800 -136.8800      30.5        48       113        60
OIR    2025130    131400   -9.8800 -136.8900      30.5        47       108        60
OIR    2025130    131400   -9.8800 -136.9000      30.5        47       104        60
OIR    2025130    131400   -9.8800 -136.9100      30.5        47       104        60
OIR    2025130    131400   -9.8800 -136.9200      30.5        46       103        60
OIR    2025130    131400   -9.8800 -136.9300      30.4        45       103        60
OIR    2025130    131400   -9.8800 -136.9400      30.2        44       103        60
OIR    2025130    131400   -9.8800 -136.9500      30.1        43       104        60
OIR    2025130    131400   -9.8800 -136.9600      30.1        43       104        60
OIR    2025130    131400   -9.8800 -136.9700      30.1        43       104        60
OIR    2025130    131400   -9.8800 -136.9800      30.1        43       107        60
OIR    2025130    131400   -9.8800 -136.9900      30.1        43       108        60
OIR    2025130    131400   -9.8800 -137.0000      30.1        43       109        60
OIR    2025130    131400   -9.8800 -137.0100      30.1        43       110        60
OIR    2025130    131400   -9.8800 -137.0200      30.1        43       109        60
OIR    2025130    131400   -9.8800 -137.0300      30.2        43       108        60
OIR    2025130    131400   -9.8800 -137.0400      30.2        43       105        60
OIR    2025130    131400   -9.8800 -137.0500      30.2        43       104        60
OIR    2025130    131400   -9.8800 -137.0600      30.3        43       104        60
OIR    2025130    131400   -9.8800 -137.0700      30.3        43       104        60
OIR    2025130    131400   -9.8800 -137.0800      30.3        43       104        60
OIR    2025130    131400   -9.8800 -137.0900      30.3        43       105        60
OIR    2025130    131400   -9.8800 -137.1000      30.4        43       107        60
OIR    2025130    131400   -9.8800 -137.1100      30.4        43       105        60
OIR    2025130    131400   -9.8800 -137.1200      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1300      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1400      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1500      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1600      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1700      30.4        43       104        60
OIR    2025130    131400   -9.8800 -137.1800      30.5        43       104        60
OIR    2025130    131400   -9.8800 -137.1900      30.6        43       104        60
OIR    2025130    131400   -9.8800 -137.2000      30.9        43       103        60
OIR    2025130    131400   -9.8800 -137.2100      32.9        45       103        60
OIR    2025130    131400   -9.8800 -137.2200      33.7        46       104        60
OIR    2025130    131400   -9.8800 -137.2300      33.8        46       107        60
OIR    2025130    131400   -9.8800 -137.2400      34.6        46       105        60
OIR    2025130    131400   -9.8800 -137.2500      35.6        47       103        60
OIR    2025130    131400   -9.8800 -137.2600      36.0        47       103        60
OIR    2025130    131400   -9.8800 -137.2700      36.4        47       103        60
OIR    2025130    131400   -9.8800 -137.2800      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3000      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3100      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3500      36.6        48       103        60
OIR    2025130    131400   -9.8800 -137.3600      36.5        47       103        60
OIR    2025130    131400   -9.8800 -137.3700      36.3        47       103        60
OIR    2025130    131400   -9.8800 -137.3800      35.9        46       103        60
OIR    2025130    131400   -9.8800 -137.3900      34.9        44       103        60
OIR    2025130    131400   -9.8800 -137.4000      34.4        43       103        60
OIR    2025130    131400   -9.8800 -137.4100      33.7        42       103        60
OIR    2025130    131400   -9.8800 -137.4200      33.3        40       103        60
OIR    2025130    131400   -9.8800 -137.4300      33.0        39       103        60
OIR    2025130    131400   -9.8800 -137.4400      32.7        37       103        60
OIR    2025130    131400   -9.8800 -137.4500      32.5        35       103        60
OIR    2025130    131400   -9.8800 -137.4600      32.7        33       103        60
OIR    2025130    131400   -9.8800 -137.4700      32.9        32       103        60
OIR    2025130    131400   -9.8800 -137.4800      33.2        29       103        60
OIR    2025130    131400   -9.8800 -137.4900      33.6        26       103        60
OIR    2025130    131400   -9.8800 -137.5000      34.1        22       103        60
OIR    2025130    131400   -9.8800 -137.5100      34.6        19       103        60
OIR    2025130    131400   -9.8800 -137.5200      35.0        17       103        60
OIR    2025130    131400   -9.8800 -137.5300      35.3        16       103        60
OIR    2025130    131400   -9.8800 -137.5400      35.4        15       103        60
OIR    2025130    131400   -9.8800 -137.5500      35.5        15       103        60
OIR    2025130    131400   -9.8800 -137.5600      35.6        15       103        60
OIR    2025130    131400   -9.8800 -137.5700      35.7        14       103        60
OIR    2025130    131400   -9.8800 -137.5800      35.8        14       103        60
OIR    2025130    131400   -9.8800 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8800 -137.6000      35.9        14       103        60
OIR    2025130    131400   -9.8800 -137.6100      35.9        14       103        60
OIR    2025130    131400   -9.8800 -137.6200      35.9        13       103        60
OIR    2025130    131400   -9.8800 -137.6300      36.0        13       103        60
OIR    2025130    131400   -9.8800 -137.6400      36.1        12       103        60
OIR    2025130    131400   -9.8800 -137.6500      36.1        12       103        60
OIR    2025130    131400   -9.8800 -137.6600      36.2        11       103        60
OIR    2025130    131400   -9.8800 -137.6700      36.2        10       103        60
OIR    2025130    131400   -9.8800 -137.6800      36.3        10       103        60
OIR    2025130    131400   -9.8800 -137.6900      36.3        10       103        60
OIR    2025130    131400   -9.8800 -137.7000      36.3         9       103        60
OIR    2025130    131400   -9.8800 -137.7100      36.3         9       103        60
OIR    2025130    131400   -9.8800 -137.7200      36.3         9       104        60
OIR    2025130    131400   -9.8800 -137.7300      36.2         9       104        60
OIR    2025130    131400   -9.8800 -137.7400      36.1         8       105        60
OIR    2025130    131400   -9.8800 -137.7500      35.8         6       105        60
OIR    2025130    131400   -9.8800 -137.7600      35.3         5       105        60
OIR    2025130    131400   -9.8800 -137.7700      35.0         3       105        60
OIR    2025130    131400   -9.8800 -137.7800      34.7         2       105        60
OIR    2025130    131400   -9.8800 -137.7900      34.2       359       104        60
OIR    2025130    131400   -9.8800 -137.8000      33.9       358       104        60
OIR    2025130    131400   -9.8800 -137.8100      33.6       356       104        60
OIR    2025130    131400   -9.8800 -137.8200      33.5       356       103        60
OIR    2025130    131400   -9.8800 -137.8300      33.3       355       103        60
OIR    2025130    131400   -9.8800 -137.8400      33.2       355       103        60
OIR    2025130    131400   -9.8800 -137.8500      33.1       354       103        60
OIR    2025130    131400   -9.8800 -137.8600      33.0       354       103        60
OIR    2025130    131400   -9.8800 -137.8700      32.8       353       103        60
OIR    2025130    131400   -9.8800 -137.8800      32.7       353       104        60
OIR    2025130    131400   -9.8800 -137.8900      32.5       352       104        60
OIR    2025130    131400   -9.8800 -137.9000      32.3       352       105        60
OIR    2025130    131400   -9.8800 -137.9100      32.1       352       108        60
OIR    2025130    131400   -9.8800 -137.9200      32.0       352       108        60
OIR    2025130    131400   -9.8800 -137.9300      31.8       351       108        60
OIR    2025130    131400   -9.8800 -137.9400      31.6       351       110        60
OIR    2025130    131400   -9.8800 -137.9500      31.5       351       110        60
OIR    2025130    131400   -9.8800 -137.9600      31.4       350       110        60
OIR    2025130    131400   -9.8800 -137.9700      31.4       350       111        60
OIR    2025130    131400   -9.8800 -137.9800      31.3       350       113        60
OIR    2025130    131400   -9.8800 -137.9900      31.3       350       115        60
OIR    2025130    131400   -9.8800 -138.0000      31.2       350       116        60
OIR    2025130    131400   -9.8800 -138.0100      31.2       349       119        60
OIR    2025130    131400   -9.8800 -138.0200      31.2       349       122        60
OIR    2025130    131400   -9.8800 -138.0300      31.2       349       122        60
OIR    2025130    131400   -9.8800 -138.0400      31.1       349       122        60
OIR    2025130    131400   -9.8800 -138.0500      31.1       349       122        60
OIR    2025130    131400   -9.8800 -138.0600      31.1       349       121        60
OIR    2025130    131400   -9.8800 -138.0700      31.0       348       123        60
OIR    2025130    131400   -9.8800 -138.0800      30.8       347       126        60
OIR    2025130    131400   -9.8800 -138.0900      30.6       345       130        60
OIR    2025130    131400   -9.8800 -138.1000      30.3       343       133        60
OIR    2025130    131400   -9.8800 -138.1100      30.2       341       135        60
OIR    2025130    131400   -9.8800 -138.1200      30.2       339       137        60
OIR    2025130    131400   -9.8800 -138.1300      30.1       337       138        60
OIR    2025130    131400   -9.8800 -138.1400      30.0       335       139        60
OIR    2025130    131400   -9.8800 -138.1500      29.8       334       141        60
OIR    2025130    131400   -9.8800 -138.1600      29.9       333       143        60
OIR    2025130    131400   -9.8800 -138.1700      29.7       332       145        60
OIR    2025130    131400   -9.8800 -138.1800      29.0       331       147        60
OIR    2025130    131400   -9.8800 -138.1900      28.2       330       147        60
OIR    2025130    131400   -9.8800 -138.2000      27.5       330       147        60
OIR    2025130    131400   -9.8800 -138.2100      26.5       329       145        60
OIR    2025130    131400   -9.8800 -138.2200      25.8       329       143        60
OIR    2025130    131400   -9.8800 -138.2300      25.5       328       140        60
OIR    2025130    131400   -9.8800 -138.2400      25.4       328       137        60
OIR    2025130    131400   -9.8800 -138.2500      25.4       328       134        60
OIR    2025130    131400   -9.8800 -138.2600      25.4       328       133        60
OIR    2025130    131400   -9.8800 -138.2700      25.4       328       133        60
OIR    2025130    131400   -9.8800 -138.2800      25.4       328       133        60
OIR    2025130    131400   -9.8800 -138.2900      25.4       328       135        60
OIR    2025130    131400   -9.8800 -138.3000      25.4       328       136        60
OIR    2025130    131400   -9.8800 -138.3100      25.4       328       136        60
OIR    2025130    131400   -9.8800 -138.3200      25.4       328       136        60
OIR    2025130    131400   -9.8800 -138.3300      25.3       328       136        60
OIR    2025130    131400   -9.8800 -138.3400      25.3       328       136        60
OIR    2025130    131400   -9.8800 -138.3500      25.3       328       137        60
OIR    2025130    131400   -9.8800 -138.3600      25.4       328       138        60
OIR    2025130    131400   -9.8800 -138.3700      25.4       328       138        60
OIR    2025130    131400   -9.8800 -138.3800      25.4       328       139        60
OIR    2025130    131400   -9.8800 -138.3900      25.4       328       139        60
OIR    2025130    131400   -9.8800 -138.4000      25.4       329       137        60
OIR    2025130    131400   -9.8800 -138.4100      25.5       329       137        60
OIR    2025130    131400   -9.8800 -138.4200      25.5       329       138        60
OIR    2025130    131400   -9.8800 -138.4300      25.5       329       140        60
OIR    2025130    131400   -9.8800 -138.4400      25.5       329       143        60
OIR    2025130    131400   -9.8800 -138.4500      25.5       329       148        60
OIR    2025130    131400   -9.8900 -136.1500      40.4        61       146        60
OIR    2025130    131400   -9.8900 -136.1600      40.7        61       144        60
OIR    2025130    131400   -9.8900 -136.1700      40.9        61       143        60
OIR    2025130    131400   -9.8900 -136.1800      41.1        61       143        60
OIR    2025130    131400   -9.8900 -136.1900      41.2        61       143        60
OIR    2025130    131400   -9.8900 -136.2000      41.3        62       145        60
OIR    2025130    131400   -9.8900 -136.2100      41.3        62       145        60
OIR    2025130    131400   -9.8900 -136.2200      41.3        62       146        60
OIR    2025130    131400   -9.8900 -136.2300      41.3        62       145        60
OIR    2025130    131400   -9.8900 -136.2400      41.2        62       145        60
OIR    2025130    131400   -9.8900 -136.2500      41.1        62       146        60
OIR    2025130    131400   -9.8900 -136.2600      41.0        62       146        60
OIR    2025130    131400   -9.8900 -136.2700      40.8        61       145        60
OIR    2025130    131400   -9.8900 -136.2800      40.6        61       144        60
OIR    2025130    131400   -9.8900 -136.2900      40.4        60       145        60
OIR    2025130    131400   -9.8900 -136.3000      40.2        60       146        60
OIR    2025130    131400   -9.8900 -136.3100      40.0        60       147        60
OIR    2025130    131400   -9.8900 -136.3500      39.6        58       146        60
OIR    2025130    131400   -9.8900 -136.3600      39.6        58       147        60
OIR    2025130    131400   -9.8900 -136.3800      39.7        58       144        60
OIR    2025130    131400   -9.8900 -136.3900      39.7        58       141        60
OIR    2025130    131400   -9.8900 -136.4000      39.7        58       141        60
OIR    2025130    131400   -9.8900 -136.4100      39.7        58       141        60
OIR    2025130    131400   -9.8900 -136.4200      39.6        58       143        60
OIR    2025130    131400   -9.8900 -136.4300      39.4        58       143        60
OIR    2025130    131400   -9.8900 -136.4400      39.1        58       141        60
OIR    2025130    131400   -9.8900 -136.4500      38.6        58       140        60
OIR    2025130    131400   -9.8900 -136.4600      38.2        58       139        60
OIR    2025130    131400   -9.8900 -136.4700      37.8        58       139        60
OIR    2025130    131400   -9.8900 -136.4800      37.5        57       140        60
OIR    2025130    131400   -9.8900 -136.4900      37.2        57       139        60
OIR    2025130    131400   -9.8900 -136.5000      37.0        57       138        60
OIR    2025130    131400   -9.8900 -136.5100      37.0        57       142        60
OIR    2025130    131400   -9.8900 -136.5200      36.9        57       142        60
OIR    2025130    131400   -9.8900 -136.5300      36.9        57       138        60
OIR    2025130    131400   -9.8900 -136.5400      36.9        58       136        60
OIR    2025130    131400   -9.8900 -136.5500      37.0        58       134        60
OIR    2025130    131400   -9.8900 -136.5600      37.0        58       133        60
OIR    2025130    131400   -9.8900 -136.5700      37.0        58       133        60
OIR    2025130    131400   -9.8900 -136.5800      37.0        58       133        60
OIR    2025130    131400   -9.8900 -136.5900      37.0        58       133        60
OIR    2025130    131400   -9.8900 -136.6000      37.0        58       130        60
OIR    2025130    131400   -9.8900 -136.6100      37.0        58       128        60
OIR    2025130    131400   -9.8900 -136.6200      37.0        58       128        60
OIR    2025130    131400   -9.8900 -136.6300      37.0        58       129        60
OIR    2025130    131400   -9.8900 -136.6400      37.0        58       130        60
OIR    2025130    131400   -9.8900 -136.6500      37.0        58       132        60
OIR    2025130    131400   -9.8900 -136.6600      36.9        58       133        60
OIR    2025130    131400   -9.8900 -136.6700      36.7        58       133        60
OIR    2025130    131400   -9.8900 -136.6800      35.9        57       133        60
OIR    2025130    131400   -9.8900 -136.6900      34.8        55       133        60
OIR    2025130    131400   -9.8900 -136.7000      33.5        53       133        60
OIR    2025130    131400   -9.8900 -136.7100      33.1        52       132        60
OIR    2025130    131400   -9.8900 -136.7200      33.0        51       130        60
OIR    2025130    131400   -9.8900 -136.7300      32.8        50       126        60
OIR    2025130    131400   -9.8900 -136.7400      32.8        50       125        60
OIR    2025130    131400   -9.8900 -136.7500      32.9        50       126        60
OIR    2025130    131400   -9.8900 -136.7600      32.9        50       126        60
OIR    2025130    131400   -9.8900 -136.7700      32.9        50       124        60
OIR    2025130    131400   -9.8900 -136.7800      32.9        50       123        60
OIR    2025130    131400   -9.8900 -136.7900      33.0        50       121        60
OIR    2025130    131400   -9.8900 -136.8000      33.0        50       124        60
OIR    2025130    131400   -9.8900 -136.8100      33.0        50       126        60
OIR    2025130    131400   -9.8900 -136.8200      33.0        50       129        60
OIR    2025130    131400   -9.8900 -136.8300      33.0        50       131        60
OIR    2025130    131400   -9.8900 -136.8400      32.8        50       134        60
OIR    2025130    131400   -9.8900 -136.8500      31.5        49       134        60
OIR    2025130    131400   -9.8900 -136.8600      31.1        49       130        60
OIR    2025130    131400   -9.8900 -136.8700      30.9        48       124        60
OIR    2025130    131400   -9.8900 -136.8800      30.5        48       115        60
OIR    2025130    131400   -9.8900 -136.8900      30.5        47       109        60
OIR    2025130    131400   -9.8900 -136.9000      30.5        47       104        60
OIR    2025130    131400   -9.8900 -136.9100      30.5        47       104        60
OIR    2025130    131400   -9.8900 -136.9200      30.6        46       103        60
OIR    2025130    131400   -9.8900 -136.9300      30.5        45       103        60
OIR    2025130    131400   -9.8900 -136.9400      30.2        43       104        60
OIR    2025130    131400   -9.8900 -136.9500      30.1        43       104        60
OIR    2025130    131400   -9.8900 -136.9600      30.1        43       104        60
OIR    2025130    131400   -9.8900 -136.9700      30.1        43       105        60
OIR    2025130    131400   -9.8900 -136.9800      30.1        43       105        60
OIR    2025130    131400   -9.8900 -136.9900      30.1        43       108        60
OIR    2025130    131400   -9.8900 -137.0000      30.1        43       110        60
OIR    2025130    131400   -9.8900 -137.0100      30.1        43       113        60
OIR    2025130    131400   -9.8900 -137.0200      30.1        43       112        60
OIR    2025130    131400   -9.8900 -137.0300      30.2        43       110        60
OIR    2025130    131400   -9.8900 -137.0400      30.2        43       107        60
OIR    2025130    131400   -9.8900 -137.0500      30.2        43       104        60
OIR    2025130    131400   -9.8900 -137.0600      30.2        43       104        60
OIR    2025130    131400   -9.8900 -137.0700      30.3        43       104        60
OIR    2025130    131400   -9.8900 -137.0800      30.3        43       105        60
OIR    2025130    131400   -9.8900 -137.0900      30.3        43       107        60
OIR    2025130    131400   -9.8900 -137.1000      30.3        43       107        60
OIR    2025130    131400   -9.8900 -137.1100      30.4        43       105        60
OIR    2025130    131400   -9.8900 -137.1200      30.4        43       104        60
OIR    2025130    131400   -9.8900 -137.1300      30.4        43       104        60
OIR    2025130    131400   -9.8900 -137.1400      30.4        43       104        60
OIR    2025130    131400   -9.8900 -137.1500      30.4        43       105        60
OIR    2025130    131400   -9.8900 -137.1600      30.4        43       105        60
OIR    2025130    131400   -9.8900 -137.1700      30.4        43       105        60
OIR    2025130    131400   -9.8900 -137.1800      30.4        43       104        60
OIR    2025130    131400   -9.8900 -137.1900      30.5        43       104        60
OIR    2025130    131400   -9.8900 -137.2000      30.7        43       103        60
OIR    2025130    131400   -9.8900 -137.2100      32.6        45       103        60
OIR    2025130    131400   -9.8900 -137.2200      33.6        46       104        60
OIR    2025130    131400   -9.8900 -137.2300      33.6        46       105        60
OIR    2025130    131400   -9.8900 -137.2400      34.1        46       105        60
OIR    2025130    131400   -9.8900 -137.2500      35.3        47       103        60
OIR    2025130    131400   -9.8900 -137.2600      35.9        47       103        60
OIR    2025130    131400   -9.8900 -137.2700      36.2        47       103        60
OIR    2025130    131400   -9.8900 -137.2800      36.5        48       103        60
OIR    2025130    131400   -9.8900 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.8900 -137.3000      36.6        48       104        60
OIR    2025130    131400   -9.8900 -137.3100      36.6        48       104        60
OIR    2025130    131400   -9.8900 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.8900 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.8900 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.8900 -137.3500      36.5        47       103        60
OIR    2025130    131400   -9.8900 -137.3600      36.4        47       103        60
OIR    2025130    131400   -9.8900 -137.3700      36.0        46       103        60
OIR    2025130    131400   -9.8900 -137.3800      35.6        44       103        60
OIR    2025130    131400   -9.8900 -137.3900      34.7        42       103        60
OIR    2025130    131400   -9.8900 -137.4000      34.2        40       103        60
OIR    2025130    131400   -9.8900 -137.4100      33.3        38       103        60
OIR    2025130    131400   -9.8900 -137.4200      33.0        37       103        60
OIR    2025130    131400   -9.8900 -137.4300      32.9        35       103        60
OIR    2025130    131400   -9.8900 -137.4400      32.9        33       103        60
OIR    2025130    131400   -9.8900 -137.4500      32.8        32       103        60
OIR    2025130    131400   -9.8900 -137.4600      32.9        31       103        60
OIR    2025130    131400   -9.8900 -137.4700      33.1        30       103        60
OIR    2025130    131400   -9.8900 -137.4800      33.4        27       103        60
OIR    2025130    131400   -9.8900 -137.4900      33.8        24       103        60
OIR    2025130    131400   -9.8900 -137.5000      34.3        21       103        60
OIR    2025130    131400   -9.8900 -137.5100      34.8        18       103        60
OIR    2025130    131400   -9.8900 -137.5200      35.1        16       103        60
OIR    2025130    131400   -9.8900 -137.5300      35.3        16       103        60
OIR    2025130    131400   -9.8900 -137.5400      35.4        15       103        60
OIR    2025130    131400   -9.8900 -137.5500      35.5        15       103        60
OIR    2025130    131400   -9.8900 -137.5600      35.6        14       103        60
OIR    2025130    131400   -9.8900 -137.5700      35.7        14       103        60
OIR    2025130    131400   -9.8900 -137.5800      35.8        14       103        60
OIR    2025130    131400   -9.8900 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.8900 -137.6000      35.8        14       103        60
OIR    2025130    131400   -9.8900 -137.6100      35.9        13       103        60
OIR    2025130    131400   -9.8900 -137.6200      35.9        13       103        60
OIR    2025130    131400   -9.8900 -137.6300      36.0        13       103        60
OIR    2025130    131400   -9.8900 -137.6400      36.0        12       103        60
OIR    2025130    131400   -9.8900 -137.6500      36.1        11       103        60
OIR    2025130    131400   -9.8900 -137.6600      36.1        11       103        60
OIR    2025130    131400   -9.8900 -137.6700      36.1        10       103        60
OIR    2025130    131400   -9.8900 -137.6800      36.2        10       103        60
OIR    2025130    131400   -9.8900 -137.6900      36.2        10       103        60
OIR    2025130    131400   -9.8900 -137.7000      36.2         9       103        60
OIR    2025130    131400   -9.8900 -137.7100      36.2         9       104        60
OIR    2025130    131400   -9.8900 -137.7200      36.1         9       105        60
OIR    2025130    131400   -9.8900 -137.7300      36.0         9       108        60
OIR    2025130    131400   -9.8900 -137.7400      35.8         8       107        60
OIR    2025130    131400   -9.8900 -137.7500      35.4         6       105        60
OIR    2025130    131400   -9.8900 -137.7600      35.0         5       107        60
OIR    2025130    131400   -9.8900 -137.7700      34.7         3       107        60
OIR    2025130    131400   -9.8900 -137.7800      34.4         2       105        60
OIR    2025130    131400   -9.8900 -137.7900      33.9       359       104        60
OIR    2025130    131400   -9.8900 -137.8000      33.7       358       103        60
OIR    2025130    131400   -9.8900 -137.8100      33.4       356       103        60
OIR    2025130    131400   -9.8900 -137.8200      33.3       356       103        60
OIR    2025130    131400   -9.8900 -137.8300      33.1       355       103        60
OIR    2025130    131400   -9.8900 -137.8400      32.9       355       103        60
OIR    2025130    131400   -9.8900 -137.8500      32.7       354       103        60
OIR    2025130    131400   -9.8900 -137.8600      32.5       353       103        60
OIR    2025130    131400   -9.8900 -137.8700      32.3       353       103        60
OIR    2025130    131400   -9.8900 -137.8800      32.2       352       103        60
OIR    2025130    131400   -9.8900 -137.8900      32.1       352       103        60
OIR    2025130    131400   -9.8900 -137.9000      32.0       352       104        60
OIR    2025130    131400   -9.8900 -137.9100      31.9       352       107        60
OIR    2025130    131400   -9.8900 -137.9200      31.8       352       109        60
OIR    2025130    131400   -9.8900 -137.9300      31.7       351       110        60
OIR    2025130    131400   -9.8900 -137.9400      31.6       351       111        60
OIR    2025130    131400   -9.8900 -137.9500      31.5       350       112        60
OIR    2025130    131400   -9.8900 -137.9600      31.4       350       113        60
OIR    2025130    131400   -9.8900 -137.9700      31.3       350       113        60
OIR    2025130    131400   -9.8900 -137.9800      31.3       350       114        60
OIR    2025130    131400   -9.8900 -137.9900      31.2       350       115        60
OIR    2025130    131400   -9.8900 -138.0000      31.2       350       116        60
OIR    2025130    131400   -9.8900 -138.0100      31.2       349       117        60
OIR    2025130    131400   -9.8900 -138.0200      31.2       349       119        60
OIR    2025130    131400   -9.8900 -138.0300      31.1       349       120        60
OIR    2025130    131400   -9.8900 -138.0400      31.1       349       120        60
OIR    2025130    131400   -9.8900 -138.0500      31.1       349       120        60
OIR    2025130    131400   -9.8900 -138.0600      31.0       349       121        60
OIR    2025130    131400   -9.8900 -138.0700      31.0       348       123        60
OIR    2025130    131400   -9.8900 -138.0800      30.8       347       126        60
OIR    2025130    131400   -9.8900 -138.0900      30.6       346       130        60
OIR    2025130    131400   -9.8900 -138.1000      30.4       344       133        60
OIR    2025130    131400   -9.8900 -138.1100      30.3       342       136        60
OIR    2025130    131400   -9.8900 -138.1200      30.1       340       138        60
OIR    2025130    131400   -9.8900 -138.1300      29.9       338       140        60
OIR    2025130    131400   -9.8900 -138.1400      29.9       336       141        60
OIR    2025130    131400   -9.8900 -138.1500      29.8       335       142        60
OIR    2025130    131400   -9.8900 -138.1600      29.9       334       143        60
OIR    2025130    131400   -9.8900 -138.1700      29.5       333       143        60
OIR    2025130    131400   -9.8900 -138.1800      28.5       332       147        60
OIR    2025130    131400   -9.8900 -138.1900      27.6       330       150        60
OIR    2025130    131400   -9.8900 -138.2100      26.2       329       148        60
OIR    2025130    131400   -9.8900 -138.2200      25.6       329       143        60
OIR    2025130    131400   -9.8900 -138.2300      25.5       329       141        60
OIR    2025130    131400   -9.8900 -138.2400      25.4       329       138        60
OIR    2025130    131400   -9.8900 -138.2500      25.4       328       136        60
OIR    2025130    131400   -9.8900 -138.2600      25.4       328       135        60
OIR    2025130    131400   -9.8900 -138.2700      25.4       328       135        60
OIR    2025130    131400   -9.8900 -138.2800      25.4       328       135        60
OIR    2025130    131400   -9.8900 -138.2900      25.4       328       137        60
OIR    2025130    131400   -9.8900 -138.3000      25.4       328       137        60
OIR    2025130    131400   -9.8900 -138.3100      25.4       328       136        60
OIR    2025130    131400   -9.8900 -138.3200      25.4       328       135        60
OIR    2025130    131400   -9.8900 -138.3300      25.3       328       134        60
OIR    2025130    131400   -9.8900 -138.3400      25.3       328       135        60
OIR    2025130    131400   -9.8900 -138.3500      25.4       328       136        60
OIR    2025130    131400   -9.8900 -138.3600      25.4       328       137        60
OIR    2025130    131400   -9.8900 -138.3700      25.4       328       138        60
OIR    2025130    131400   -9.8900 -138.3800      25.4       329       138        60
OIR    2025130    131400   -9.8900 -138.3900      25.4       329       138        60
OIR    2025130    131400   -9.8900 -138.4000      25.5       329       136        60
OIR    2025130    131400   -9.8900 -138.4100      25.5       329       135        60
OIR    2025130    131400   -9.8900 -138.4200      25.5       329       137        60
OIR    2025130    131400   -9.8900 -138.4300      25.5       329       140        60
OIR    2025130    131400   -9.8900 -138.4400      25.5       329       143        60
OIR    2025130    131400   -9.8900 -138.4500      25.6       329       148        60
OIR    2025130    131400   -9.9000 -136.1500      40.4        61       148        60
OIR    2025130    131400   -9.9000 -136.1600      40.6        61       145        60
OIR    2025130    131400   -9.9000 -136.1700      40.8        61       143        60
OIR    2025130    131400   -9.9000 -136.1800      41.0        61       144        60
OIR    2025130    131400   -9.9000 -136.1900      41.1        61       144        60
OIR    2025130    131400   -9.9000 -136.2000      41.2        61       146        60
OIR    2025130    131400   -9.9000 -136.2100      41.2        61       146        60
OIR    2025130    131400   -9.9000 -136.2200      41.1        61       147        60
OIR    2025130    131400   -9.9000 -136.2300      41.1        61       147        60
OIR    2025130    131400   -9.9000 -136.2400      41.0        61       147        60
OIR    2025130    131400   -9.9000 -136.2500      40.9        61       147        60
OIR    2025130    131400   -9.9000 -136.2600      40.8        61       147        60
OIR    2025130    131400   -9.9000 -136.2700      40.7        60       145        60
OIR    2025130    131400   -9.9000 -136.2800      40.6        60       144        60
OIR    2025130    131400   -9.9000 -136.2900      40.5        60       146        60
OIR    2025130    131400   -9.9000 -136.3400      39.8        58       147        60
OIR    2025130    131400   -9.9000 -136.3500      39.7        58       146        60
OIR    2025130    131400   -9.9000 -136.3600      39.8        58       147        60
OIR    2025130    131400   -9.9000 -136.3800      39.8        57       144        60
OIR    2025130    131400   -9.9000 -136.3900      39.8        57       140        60
OIR    2025130    131400   -9.9000 -136.4000      39.8        57       140        60
OIR    2025130    131400   -9.9000 -136.4100      39.7        57       140        60
OIR    2025130    131400   -9.9000 -136.4200      39.7        57       142        60
OIR    2025130    131400   -9.9000 -136.4300      39.6        57       143        60
OIR    2025130    131400   -9.9000 -136.4400      39.2        57       142        60
OIR    2025130    131400   -9.9000 -136.4500      38.6        57       141        60
OIR    2025130    131400   -9.9000 -136.4600      38.1        57       138        60
OIR    2025130    131400   -9.9000 -136.4700      37.6        57       138        60
OIR    2025130    131400   -9.9000 -136.4800      37.4        57       139        60
OIR    2025130    131400   -9.9000 -136.4900      37.2        57       138        60
OIR    2025130    131400   -9.9000 -136.5000      37.0        57       137        60
OIR    2025130    131400   -9.9000 -136.5100      36.9        57       141        60
OIR    2025130    131400   -9.9000 -136.5200      37.0        57       141        60
OIR    2025130    131400   -9.9000 -136.5300      37.0        57       138        60
OIR    2025130    131400   -9.9000 -136.5400      37.0        58       136        60
OIR    2025130    131400   -9.9000 -136.5500      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.5600      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.5700      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.5800      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.5900      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.6000      37.0        58       130        60
OIR    2025130    131400   -9.9000 -136.6100      37.0        58       127        60
OIR    2025130    131400   -9.9000 -136.6200      37.0        58       128        60
OIR    2025130    131400   -9.9000 -136.6300      37.0        58       130        60
OIR    2025130    131400   -9.9000 -136.6400      37.0        58       132        60
OIR    2025130    131400   -9.9000 -136.6500      37.0        58       134        60
OIR    2025130    131400   -9.9000 -136.6600      36.9        58       136        60
OIR    2025130    131400   -9.9000 -136.6700      36.6        57       136        60
OIR    2025130    131400   -9.9000 -136.6800      35.6        56       134        60
OIR    2025130    131400   -9.9000 -136.6900      34.3        54       133        60
OIR    2025130    131400   -9.9000 -136.7000      33.4        52       132        60
OIR    2025130    131400   -9.9000 -136.7100      33.1        51       130        60
OIR    2025130    131400   -9.9000 -136.7200      33.0        51       128        60
OIR    2025130    131400   -9.9000 -136.7300      33.0        50       124        60
OIR    2025130    131400   -9.9000 -136.7400      32.9        50       122        60
OIR    2025130    131400   -9.9000 -136.7500      32.9        50       123        60
OIR    2025130    131400   -9.9000 -136.7600      33.0        50       124        60
OIR    2025130    131400   -9.9000 -136.7700      33.0        50       124        60
OIR    2025130    131400   -9.9000 -136.7800      33.0        50       123        60
OIR    2025130    131400   -9.9000 -136.7900      33.0        50       123        60
OIR    2025130    131400   -9.9000 -136.8000      33.0        50       126        60
OIR    2025130    131400   -9.9000 -136.8100      33.0        50       128        60
OIR    2025130    131400   -9.9000 -136.8200      33.0        50       130        60
OIR    2025130    131400   -9.9000 -136.8300      32.9        50       132        60
OIR    2025130    131400   -9.9000 -136.8400      32.9        50       136        60
OIR    2025130    131400   -9.9000 -136.8500      31.9        50       136        60
OIR    2025130    131400   -9.9000 -136.8600      31.3        49       134        60
OIR    2025130    131400   -9.9000 -136.8700      31.0        48       128        60
OIR    2025130    131400   -9.9000 -136.8800      30.7        48       116        60
OIR    2025130    131400   -9.9000 -136.8900      30.5        47       111        60
OIR    2025130    131400   -9.9000 -136.9000      30.5        47       105        60
OIR    2025130    131400   -9.9000 -136.9100      30.6        47       104        60
OIR    2025130    131400   -9.9000 -136.9200      30.6        46       104        60
OIR    2025130    131400   -9.9000 -136.9300      30.3        45       104        60
OIR    2025130    131400   -9.9000 -136.9400      30.1        43       104        60
OIR    2025130    131400   -9.9000 -136.9500      30.1        43       104        60
OIR    2025130    131400   -9.9000 -136.9600      30.1        43       105        60
OIR    2025130    131400   -9.9000 -136.9700      30.1        43       105        60
OIR    2025130    131400   -9.9000 -136.9800      30.1        43       105        60
OIR    2025130    131400   -9.9000 -136.9900      30.1        43       107        60
OIR    2025130    131400   -9.9000 -137.0000      30.1        43       111        60
OIR    2025130    131400   -9.9000 -137.0100      30.1        43       114        60
OIR    2025130    131400   -9.9000 -137.0200      30.1        43       113        60
OIR    2025130    131400   -9.9000 -137.0300      30.2        43       111        60
OIR    2025130    131400   -9.9000 -137.0400      30.2        43       108        60
OIR    2025130    131400   -9.9000 -137.0500      30.2        43       104        60
OIR    2025130    131400   -9.9000 -137.0600      30.2        43       104        60
OIR    2025130    131400   -9.9000 -137.0700      30.3        43       104        60
OIR    2025130    131400   -9.9000 -137.0800      30.3        43       105        60
OIR    2025130    131400   -9.9000 -137.0900      30.3        43       107        60
OIR    2025130    131400   -9.9000 -137.1000      30.3        43       107        60
OIR    2025130    131400   -9.9000 -137.1100      30.3        43       105        60
OIR    2025130    131400   -9.9000 -137.1200      30.3        43       105        60
OIR    2025130    131400   -9.9000 -137.1300      30.4        43       105        60
OIR    2025130    131400   -9.9000 -137.1400      30.4        43       107        60
OIR    2025130    131400   -9.9000 -137.1500      30.4        43       107        60
OIR    2025130    131400   -9.9000 -137.1600      30.4        43       107        60
OIR    2025130    131400   -9.9000 -137.1700      30.4        43       105        60
OIR    2025130    131400   -9.9000 -137.1800      30.4        43       104        60
OIR    2025130    131400   -9.9000 -137.1900      30.4        43       104        60
OIR    2025130    131400   -9.9000 -137.2000      30.8        43       104        60
OIR    2025130    131400   -9.9000 -137.2100      32.5        45       103        60
OIR    2025130    131400   -9.9000 -137.2200      33.4        46       104        60
OIR    2025130    131400   -9.9000 -137.2300      33.6        46       105        60
OIR    2025130    131400   -9.9000 -137.2400      33.8        46       104        60
OIR    2025130    131400   -9.9000 -137.2500      34.8        47       103        60
OIR    2025130    131400   -9.9000 -137.2600      35.9        47       103        60
OIR    2025130    131400   -9.9000 -137.2700      36.1        47       103        60
OIR    2025130    131400   -9.9000 -137.2800      36.4        48       103        60
OIR    2025130    131400   -9.9000 -137.2900      36.6        48       103        60
OIR    2025130    131400   -9.9000 -137.3000      36.6        48       104        60
OIR    2025130    131400   -9.9000 -137.3100      36.6        48       104        60
OIR    2025130    131400   -9.9000 -137.3200      36.6        48       103        60
OIR    2025130    131400   -9.9000 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.9000 -137.3400      36.6        48       103        60
OIR    2025130    131400   -9.9000 -137.3500      36.5        47       103        60
OIR    2025130    131400   -9.9000 -137.3600      36.1        46       103        60
OIR    2025130    131400   -9.9000 -137.3700      35.6        44       103        60
OIR    2025130    131400   -9.9000 -137.3800      35.2        42       103        60
OIR    2025130    131400   -9.9000 -137.3900      34.3        39       103        60
OIR    2025130    131400   -9.9000 -137.4000      33.7        36       103        60
OIR    2025130    131400   -9.9000 -137.4100      32.9        34       103        60
OIR    2025130    131400   -9.9000 -137.4200      32.8        33       103        60
OIR    2025130    131400   -9.9000 -137.4300      32.9        32       103        60
OIR    2025130    131400   -9.9000 -137.4400      32.9        31       103        60
OIR    2025130    131400   -9.9000 -137.4500      33.0        30       103        60
OIR    2025130    131400   -9.9000 -137.4600      33.1        29       103        60
OIR    2025130    131400   -9.9000 -137.4700      33.3        28       103        60
OIR    2025130    131400   -9.9000 -137.4800      33.6        26       103        60
OIR    2025130    131400   -9.9000 -137.4900      34.0        22       103        60
OIR    2025130    131400   -9.9000 -137.5000      34.5        19       103        60
OIR    2025130    131400   -9.9000 -137.5100      34.9        17       103        60
OIR    2025130    131400   -9.9000 -137.5200      35.2        16       103        60
OIR    2025130    131400   -9.9000 -137.5300      35.3        15       103        60
OIR    2025130    131400   -9.9000 -137.5400      35.4        15       103        60
OIR    2025130    131400   -9.9000 -137.5500      35.5        15       103        60
OIR    2025130    131400   -9.9000 -137.5600      35.6        14       103        60
OIR    2025130    131400   -9.9000 -137.5700      35.7        14       103        60
OIR    2025130    131400   -9.9000 -137.5800      35.7        14       103        60
OIR    2025130    131400   -9.9000 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.9000 -137.6000      35.8        14       103        60
OIR    2025130    131400   -9.9000 -137.6100      35.9        13       103        60
OIR    2025130    131400   -9.9000 -137.6200      35.9        13       103        60
OIR    2025130    131400   -9.9000 -137.6300      35.9        12       103        60
OIR    2025130    131400   -9.9000 -137.6400      36.0        12       103        60
OIR    2025130    131400   -9.9000 -137.6500      36.0        11       103        60
OIR    2025130    131400   -9.9000 -137.6600      36.0        11       103        60
OIR    2025130    131400   -9.9000 -137.6700      36.0        10       103        60
OIR    2025130    131400   -9.9000 -137.6800      36.0        10       103        60
OIR    2025130    131400   -9.9000 -137.6900      36.0        10       104        60
OIR    2025130    131400   -9.9000 -137.7000      36.0         9       103        60
OIR    2025130    131400   -9.9000 -137.7100      36.0         9       104        60
OIR    2025130    131400   -9.9000 -137.7200      35.9         9       105        60
OIR    2025130    131400   -9.9000 -137.7300      35.8         8       108        60
OIR    2025130    131400   -9.9000 -137.7400      35.5         7       108        60
OIR    2025130    131400   -9.9000 -137.7500      35.2         6       107        60
OIR    2025130    131400   -9.9000 -137.7600      34.9         4       107        60
OIR    2025130    131400   -9.9000 -137.7700      34.6         3       105        60
OIR    2025130    131400   -9.9000 -137.7800      34.2         2       105        60
OIR    2025130    131400   -9.9000 -137.7900      33.7       359       104        60
OIR    2025130    131400   -9.9000 -137.8000      33.4       357       103        60
OIR    2025130    131400   -9.9000 -137.8100      33.1       356       103        60
OIR    2025130    131400   -9.9000 -137.8200      32.9       356       103        60
OIR    2025130    131400   -9.9000 -137.8300      32.7       355       103        60
OIR    2025130    131400   -9.9000 -137.8400      32.4       354       103        60
OIR    2025130    131400   -9.9000 -137.8500      32.2       354       103        60
OIR    2025130    131400   -9.9000 -137.8600      32.2       353       103        60
OIR    2025130    131400   -9.9000 -137.8700      32.0       353       103        60
OIR    2025130    131400   -9.9000 -137.8800      31.9       352       103        60
OIR    2025130    131400   -9.9000 -137.8900      31.9       352       103        60
OIR    2025130    131400   -9.9000 -137.9000      31.9       352       104        60
OIR    2025130    131400   -9.9000 -137.9100      31.8       352       105        60
OIR    2025130    131400   -9.9000 -137.9200      31.7       352       108        60
OIR    2025130    131400   -9.9000 -137.9300      31.7       351       110        60
OIR    2025130    131400   -9.9000 -137.9400      31.6       351       111        60
OIR    2025130    131400   -9.9000 -137.9500      31.4       350       112        60
OIR    2025130    131400   -9.9000 -137.9600      31.3       350       113        60
OIR    2025130    131400   -9.9000 -137.9700      31.3       350       113        60
OIR    2025130    131400   -9.9000 -137.9800      31.2       350       112        60
OIR    2025130    131400   -9.9000 -137.9900      31.2       350       114        60
OIR    2025130    131400   -9.9000 -138.0000      31.2       350       116        60
OIR    2025130    131400   -9.9000 -138.0100      31.2       349       117        60
OIR    2025130    131400   -9.9000 -138.0200      31.1       349       120        60
OIR    2025130    131400   -9.9000 -138.0300      31.1       349       120        60
OIR    2025130    131400   -9.9000 -138.0400      31.1       349       121        60
OIR    2025130    131400   -9.9000 -138.0500      31.0       349       121        60
OIR    2025130    131400   -9.9000 -138.0600      31.0       349       122        60
OIR    2025130    131400   -9.9000 -138.0700      30.9       348       124        60
OIR    2025130    131400   -9.9000 -138.0800      30.8       347       127        60
OIR    2025130    131400   -9.9000 -138.0900      30.6       346       130        60
OIR    2025130    131400   -9.9000 -138.1000      30.5       344       133        60
OIR    2025130    131400   -9.9000 -138.1100      30.3       343       135        60
OIR    2025130    131400   -9.9000 -138.1200      30.1       341       137        60
OIR    2025130    131400   -9.9000 -138.1300      30.0       339       139        60
OIR    2025130    131400   -9.9000 -138.1400      30.1       337       140        60
OIR    2025130    131400   -9.9000 -138.1500      30.0       336       140        60
OIR    2025130    131400   -9.9000 -138.1600      29.9       335       139        60
OIR    2025130    131400   -9.9000 -138.1700      29.3       334       139        60
OIR    2025130    131400   -9.9000 -138.1800      28.1       332       142        60
OIR    2025130    131400   -9.9000 -138.1900      27.3       331       146        60
OIR    2025130    131400   -9.9000 -138.2100      25.9       329       149        60
OIR    2025130    131400   -9.9000 -138.2200      25.5       329       145        60
OIR    2025130    131400   -9.9000 -138.2300      25.4       329       142        60
OIR    2025130    131400   -9.9000 -138.2400      25.4       329       140        60
OIR    2025130    131400   -9.9000 -138.2500      25.4       329       137        60
OIR    2025130    131400   -9.9000 -138.2600      25.4       329       136        60
OIR    2025130    131400   -9.9000 -138.2700      25.4       329       136        60
OIR    2025130    131400   -9.9000 -138.2800      25.4       328       136        60
OIR    2025130    131400   -9.9000 -138.2900      25.4       328       137        60
OIR    2025130    131400   -9.9000 -138.3000      25.4       328       137        60
OIR    2025130    131400   -9.9000 -138.3100      25.4       328       137        60
OIR    2025130    131400   -9.9000 -138.3200      25.4       328       136        60
OIR    2025130    131400   -9.9000 -138.3300      25.4       328       136        60
OIR    2025130    131400   -9.9000 -138.3400      25.4       328       136        60
OIR    2025130    131400   -9.9000 -138.3500      25.4       328       138        60
OIR    2025130    131400   -9.9000 -138.3600      25.4       329       138        60
OIR    2025130    131400   -9.9000 -138.3700      25.4       329       138        60
OIR    2025130    131400   -9.9000 -138.3800      25.4       329       137        60
OIR    2025130    131400   -9.9000 -138.3900      25.4       329       136        60
OIR    2025130    131400   -9.9000 -138.4000      25.5       329       135        60
OIR    2025130    131400   -9.9000 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9000 -138.4200      25.5       329       137        60
OIR    2025130    131400   -9.9000 -138.4300      25.5       329       141        60
OIR    2025130    131400   -9.9000 -138.4400      25.5       329       144        60
OIR    2025130    131400   -9.9000 -138.4500      25.6       330       147        60
OIR    2025130    131400   -9.9100 -136.1600      40.6        61       146        60
OIR    2025130    131400   -9.9100 -136.1700      40.8        61       143        60
OIR    2025130    131400   -9.9100 -136.1800      40.9        61       145        60
OIR    2025130    131400   -9.9100 -136.1900      41.0        61       146        60
OIR    2025130    131400   -9.9100 -136.2000      41.0        61       148        60
OIR    2025130    131400   -9.9100 -136.2100      41.0        61       148        60
OIR    2025130    131400   -9.9100 -136.2200      41.0        61       148        60
OIR    2025130    131400   -9.9100 -136.2300      40.9        61       148        60
OIR    2025130    131400   -9.9100 -136.2400      40.9        60       147        60
OIR    2025130    131400   -9.9100 -136.2500      40.8        60       147        60
OIR    2025130    131400   -9.9100 -136.2600      40.7        60       147        60
OIR    2025130    131400   -9.9100 -136.2700      40.7        60       146        60
OIR    2025130    131400   -9.9100 -136.2800      40.6        59       145        60
OIR    2025130    131400   -9.9100 -136.3300      40.0        58       147        60
OIR    2025130    131400   -9.9100 -136.3400      39.9        58       146        60
OIR    2025130    131400   -9.9100 -136.3500      39.9        58       144        60
OIR    2025130    131400   -9.9100 -136.3600      39.8        57       144        60
OIR    2025130    131400   -9.9100 -136.3700      39.8        57       144        60
OIR    2025130    131400   -9.9100 -136.3800      39.8        57       142        60
OIR    2025130    131400   -9.9100 -136.3900      39.8        57       140        60
OIR    2025130    131400   -9.9100 -136.4000      39.8        57       139        60
OIR    2025130    131400   -9.9100 -136.4100      39.8        57       139        60
OIR    2025130    131400   -9.9100 -136.4200      39.7        57       141        60
OIR    2025130    131400   -9.9100 -136.4300      39.6        57       143        60
OIR    2025130    131400   -9.9100 -136.4400      39.3        57       146        60
OIR    2025130    131400   -9.9100 -136.4500      38.6        56       144        60
OIR    2025130    131400   -9.9100 -136.4600      38.1        56       138        60
OIR    2025130    131400   -9.9100 -136.4700      37.6        56       138        60
OIR    2025130    131400   -9.9100 -136.4800      37.3        56       137        60
OIR    2025130    131400   -9.9100 -136.4900      37.2        56       137        60
OIR    2025130    131400   -9.9100 -136.5000      37.0        56       137        60
OIR    2025130    131400   -9.9100 -136.5100      36.9        56       138        60
OIR    2025130    131400   -9.9100 -136.5200      37.0        57       138        60
OIR    2025130    131400   -9.9100 -136.5300      37.0        57       138        60
OIR    2025130    131400   -9.9100 -136.5400      37.0        57       136        60
OIR    2025130    131400   -9.9100 -136.5500      37.0        58       134        60
OIR    2025130    131400   -9.9100 -136.5600      37.0        58       134        60
OIR    2025130    131400   -9.9100 -136.5700      37.0        58       134        60
OIR    2025130    131400   -9.9100 -136.5800      37.0        58       134        60
OIR    2025130    131400   -9.9100 -136.5900      37.0        58       134        60
OIR    2025130    131400   -9.9100 -136.6000      37.0        58       130        60
OIR    2025130    131400   -9.9100 -136.6100      37.0        58       125        60
OIR    2025130    131400   -9.9100 -136.6200      37.0        58       127        60
OIR    2025130    131400   -9.9100 -136.6300      37.0        58       130        60
OIR    2025130    131400   -9.9100 -136.6400      37.0        58       132        60
OIR    2025130    131400   -9.9100 -136.6500      37.0        58       135        60
OIR    2025130    131400   -9.9100 -136.6600      36.8        58       139        60
OIR    2025130    131400   -9.9100 -136.6700      36.7        58       137        60
OIR    2025130    131400   -9.9100 -136.6800      35.4        56       134        60
OIR    2025130    131400   -9.9100 -136.6900      34.0        53       133        60
OIR    2025130    131400   -9.9100 -136.7000      33.4        52       131        60
OIR    2025130    131400   -9.9100 -136.7100      33.1        51       131        60
OIR    2025130    131400   -9.9100 -136.7200      33.0        50       129        60
OIR    2025130    131400   -9.9100 -136.7300      33.0        50       125        60
OIR    2025130    131400   -9.9100 -136.7400      33.0        50       122        60
OIR    2025130    131400   -9.9100 -136.7500      33.0        50       122        60
OIR    2025130    131400   -9.9100 -136.7600      33.0        50       122        60
OIR    2025130    131400   -9.9100 -136.7700      33.0        50       123        60
OIR    2025130    131400   -9.9100 -136.7800      33.0        50       125        60
OIR    2025130    131400   -9.9100 -136.7900      33.0        50       127        60
OIR    2025130    131400   -9.9100 -136.8000      33.0        50       129        60
OIR    2025130    131400   -9.9100 -136.8100      33.0        50       132        60
OIR    2025130    131400   -9.9100 -136.8200      33.0        50       131        60
OIR    2025130    131400   -9.9100 -136.8300      32.9        50       130        60
OIR    2025130    131400   -9.9100 -136.8400      32.9        50       135        60
OIR    2025130    131400   -9.9100 -136.8500      32.3        50       137        60
OIR    2025130    131400   -9.9100 -136.8600      31.6        49       135        60
OIR    2025130    131400   -9.9100 -136.8700      31.0        48       131        60
OIR    2025130    131400   -9.9100 -136.8800      30.8        48       119        60
OIR    2025130    131400   -9.9100 -136.8900      30.6        47       112        60
OIR    2025130    131400   -9.9100 -136.9000      30.6        47       107        60
OIR    2025130    131400   -9.9100 -136.9100      30.6        47       105        60
OIR    2025130    131400   -9.9100 -136.9200      30.7        46       105        60
OIR    2025130    131400   -9.9100 -136.9300      30.5        45       105        60
OIR    2025130    131400   -9.9100 -136.9400      30.1        43       105        60
OIR    2025130    131400   -9.9100 -136.9500      30.1        43       105        60
OIR    2025130    131400   -9.9100 -136.9600      30.1        43       105        60
OIR    2025130    131400   -9.9100 -136.9700      30.1        43       105        60
OIR    2025130    131400   -9.9100 -136.9800      30.1        43       105        60
OIR    2025130    131400   -9.9100 -136.9900      30.1        43       108        60
OIR    2025130    131400   -9.9100 -137.0000      30.1        43       111        60
OIR    2025130    131400   -9.9100 -137.0100      30.1        43       115        60
OIR    2025130    131400   -9.9100 -137.0200      30.2        43       114        60
OIR    2025130    131400   -9.9100 -137.0300      30.2        43       112        60
OIR    2025130    131400   -9.9100 -137.0400      30.2        43       109        60
OIR    2025130    131400   -9.9100 -137.0500      30.2        43       105        60
OIR    2025130    131400   -9.9100 -137.0600      30.2        43       105        60
OIR    2025130    131400   -9.9100 -137.0700      30.3        43       105        60
OIR    2025130    131400   -9.9100 -137.0800      30.3        43       105        60
OIR    2025130    131400   -9.9100 -137.0900      30.3        43       105        60
OIR    2025130    131400   -9.9100 -137.1000      30.3        43       105        60
OIR    2025130    131400   -9.9100 -137.1100      30.3        43       105        60
OIR    2025130    131400   -9.9100 -137.1200      30.3        43       107        60
OIR    2025130    131400   -9.9100 -137.1300      30.4        43       108        60
OIR    2025130    131400   -9.9100 -137.1400      30.4        43       108        60
OIR    2025130    131400   -9.9100 -137.1500      30.4        43       108        60
OIR    2025130    131400   -9.9100 -137.1600      30.4        43       107        60
OIR    2025130    131400   -9.9100 -137.1700      30.4        43       105        60
OIR    2025130    131400   -9.9100 -137.1800      30.4        43       104        60
OIR    2025130    131400   -9.9100 -137.1900      30.4        43       104        60
OIR    2025130    131400   -9.9100 -137.2000      31.2        44       104        60
OIR    2025130    131400   -9.9100 -137.2100      32.7        46       103        60
OIR    2025130    131400   -9.9100 -137.2200      33.4        46       104        60
OIR    2025130    131400   -9.9100 -137.2300      33.5        46       105        60
OIR    2025130    131400   -9.9100 -137.2400      33.7        46       104        60
OIR    2025130    131400   -9.9100 -137.2500      34.4        47       104        60
OIR    2025130    131400   -9.9100 -137.2600      35.6        47       103        60
OIR    2025130    131400   -9.9100 -137.2700      36.1        48       103        60
OIR    2025130    131400   -9.9100 -137.2800      36.3        48       103        60
OIR    2025130    131400   -9.9100 -137.2900      36.5        48       103        60
OIR    2025130    131400   -9.9100 -137.3000      36.6        48       105        60
OIR    2025130    131400   -9.9100 -137.3100      36.6        48       107        60
OIR    2025130    131400   -9.9100 -137.3200      36.6        48       104        60
OIR    2025130    131400   -9.9100 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.9100 -137.3400      36.6        47       103        60
OIR    2025130    131400   -9.9100 -137.3500      36.4        47       103        60
OIR    2025130    131400   -9.9100 -137.3600      35.8        45       103        60
OIR    2025130    131400   -9.9100 -137.3700      35.2        42       103        60
OIR    2025130    131400   -9.9100 -137.3800      34.8        40       103        60
OIR    2025130    131400   -9.9100 -137.3900      33.6        35       103        60
OIR    2025130    131400   -9.9100 -137.4000      33.3        33       103        60
OIR    2025130    131400   -9.9100 -137.4100      32.9        31       103        60
OIR    2025130    131400   -9.9100 -137.4200      32.8        30       103        60
OIR    2025130    131400   -9.9100 -137.4300      32.9        30       103        60
OIR    2025130    131400   -9.9100 -137.4400      33.0        29       103        60
OIR    2025130    131400   -9.9100 -137.4500      33.1        29       103        60
OIR    2025130    131400   -9.9100 -137.4600      33.3        28       103        60
OIR    2025130    131400   -9.9100 -137.4700      33.5        27       103        60
OIR    2025130    131400   -9.9100 -137.4800      33.9        24       103        60
OIR    2025130    131400   -9.9100 -137.4900      34.4        21       103        60
OIR    2025130    131400   -9.9100 -137.5000      34.8        18       103        60
OIR    2025130    131400   -9.9100 -137.5100      35.1        17       103        60
OIR    2025130    131400   -9.9100 -137.5200      35.2        16       103        60
OIR    2025130    131400   -9.9100 -137.5300      35.3        15       103        60
OIR    2025130    131400   -9.9100 -137.5400      35.4        15       103        60
OIR    2025130    131400   -9.9100 -137.5500      35.5        14       103        60
OIR    2025130    131400   -9.9100 -137.5600      35.6        14       103        60
OIR    2025130    131400   -9.9100 -137.5700      35.7        14       103        60
OIR    2025130    131400   -9.9100 -137.5800      35.7        14       103        60
OIR    2025130    131400   -9.9100 -137.5900      35.8        14       103        60
OIR    2025130    131400   -9.9100 -137.6000      35.8        13       103        60
OIR    2025130    131400   -9.9100 -137.6100      35.9        13       103        60
OIR    2025130    131400   -9.9100 -137.6200      35.9        13       103        60
OIR    2025130    131400   -9.9100 -137.6300      35.9        12       103        60
OIR    2025130    131400   -9.9100 -137.6400      35.9        11       103        60
OIR    2025130    131400   -9.9100 -137.6500      36.0        11       103        60
OIR    2025130    131400   -9.9100 -137.6600      35.9        10       103        60
OIR    2025130    131400   -9.9100 -137.6700      35.9        10       103        60
OIR    2025130    131400   -9.9100 -137.6800      35.9        10       104        60
OIR    2025130    131400   -9.9100 -137.6900      35.9         9       104        60
OIR    2025130    131400   -9.9100 -137.7000      35.9         9       104        60
OIR    2025130    131400   -9.9100 -137.7100      35.8         9       104        60
OIR    2025130    131400   -9.9100 -137.7200      35.7         9       105        60
OIR    2025130    131400   -9.9100 -137.7300      35.6         8       109        60
OIR    2025130    131400   -9.9100 -137.7400      35.3         7       109        60
OIR    2025130    131400   -9.9100 -137.7500      34.9         6       108        60
OIR    2025130    131400   -9.9100 -137.7600      34.6         4       105        60
OIR    2025130    131400   -9.9100 -137.7700      34.3         3       105        60
OIR    2025130    131400   -9.9100 -137.7800      34.0         2       105        60
OIR    2025130    131400   -9.9100 -137.7900      33.4       359       104        60
OIR    2025130    131400   -9.9100 -137.8000      33.1       357       103        60
OIR    2025130    131400   -9.9100 -137.8100      32.8       356       103        60
OIR    2025130    131400   -9.9100 -137.8200      32.5       355       103        60
OIR    2025130    131400   -9.9100 -137.8300      32.2       355       103        60
OIR    2025130    131400   -9.9100 -137.8400      32.0       354       103        60
OIR    2025130    131400   -9.9100 -137.8500      32.0       353       103        60
OIR    2025130    131400   -9.9100 -137.8600      31.9       353       103        60
OIR    2025130    131400   -9.9100 -137.8700      31.8       352       103        60
OIR    2025130    131400   -9.9100 -137.8800      31.8       352       103        60
OIR    2025130    131400   -9.9100 -137.8900      31.8       352       103        60
OIR    2025130    131400   -9.9100 -137.9000      31.7       352       104        60
OIR    2025130    131400   -9.9100 -137.9100      31.7       352       105        60
OIR    2025130    131400   -9.9100 -137.9200      31.7       352       108        60
OIR    2025130    131400   -9.9100 -137.9300      31.6       351       110        60
OIR    2025130    131400   -9.9100 -137.9400      31.5       351       112        60
OIR    2025130    131400   -9.9100 -137.9500      31.4       351       113        60
OIR    2025130    131400   -9.9100 -137.9600      31.3       350       112        60
OIR    2025130    131400   -9.9100 -137.9700      31.2       350       112        60
OIR    2025130    131400   -9.9100 -137.9800      31.2       350       110        60
OIR    2025130    131400   -9.9100 -137.9900      31.2       350       113        60
OIR    2025130    131400   -9.9100 -138.0000      31.1       350       115        60
OIR    2025130    131400   -9.9100 -138.0100      31.1       349       117        60
OIR    2025130    131400   -9.9100 -138.0200      31.1       349       120        60
OIR    2025130    131400   -9.9100 -138.0300      31.0       349       121        60
OIR    2025130    131400   -9.9100 -138.0400      31.0       349       121        60
OIR    2025130    131400   -9.9100 -138.0500      30.9       349       122        60
OIR    2025130    131400   -9.9100 -138.0600      30.9       348       123        60
OIR    2025130    131400   -9.9100 -138.0700      30.9       348       126        60
OIR    2025130    131400   -9.9100 -138.0800      30.8       347       128        60
OIR    2025130    131400   -9.9100 -138.0900      30.7       346       131        60
OIR    2025130    131400   -9.9100 -138.1000      30.6       345       132        60
OIR    2025130    131400   -9.9100 -138.1100      30.5       343       134        60
OIR    2025130    131400   -9.9100 -138.1200      30.3       341       136        60
OIR    2025130    131400   -9.9100 -138.1300      30.4       339       138        60
OIR    2025130    131400   -9.9100 -138.1400      30.2       338       137        60
OIR    2025130    131400   -9.9100 -138.1500      30.0       336       136        60
OIR    2025130    131400   -9.9100 -138.1600      29.8       336       135        60
OIR    2025130    131400   -9.9100 -138.1700      29.2       335       134        60
OIR    2025130    131400   -9.9100 -138.1800      27.9       333       136        60
OIR    2025130    131400   -9.9100 -138.1900      27.1       331       142        60
OIR    2025130    131400   -9.9100 -138.2000      26.3       330       151        60
OIR    2025130    131400   -9.9100 -138.2100      25.6       329       149        60
OIR    2025130    131400   -9.9100 -138.2200      25.4       329       147        60
OIR    2025130    131400   -9.9100 -138.2300      25.4       329       144        60
OIR    2025130    131400   -9.9100 -138.2400      25.4       329       142        60
OIR    2025130    131400   -9.9100 -138.2500      25.4       329       139        60
OIR    2025130    131400   -9.9100 -138.2600      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.2700      25.3       329       137        60
OIR    2025130    131400   -9.9100 -138.2800      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.2900      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.3000      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.3100      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.3200      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.3300      25.4       329       137        60
OIR    2025130    131400   -9.9100 -138.3400      25.4       329       138        60
OIR    2025130    131400   -9.9100 -138.3500      25.4       329       140        60
OIR    2025130    131400   -9.9100 -138.3600      25.4       329       140        60
OIR    2025130    131400   -9.9100 -138.3700      25.4       329       139        60
OIR    2025130    131400   -9.9100 -138.3800      25.4       329       136        60
OIR    2025130    131400   -9.9100 -138.3900      25.4       329       134        60
OIR    2025130    131400   -9.9100 -138.4000      25.5       329       134        60
OIR    2025130    131400   -9.9100 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9100 -138.4200      25.5       329       138        60
OIR    2025130    131400   -9.9100 -138.4300      25.5       329       141        60
OIR    2025130    131400   -9.9100 -138.4400      25.5       330       145        60
OIR    2025130    131400   -9.9100 -138.4500      25.6       331       146        60
OIR    2025130    131400   -9.9100 -138.4600      25.5       334       147        60
OIR    2025130    131400   -9.9200 -136.1600      40.5        60       148        60
OIR    2025130    131400   -9.9200 -136.1700      40.7        60       144        60
OIR    2025130    131400   -9.9200 -136.1800      40.8        60       145        60
OIR    2025130    131400   -9.9200 -136.1900      40.9        60       147        60
OIR    2025130    131400   -9.9200 -136.2000      41.0        60       149        60
OIR    2025130    131400   -9.9200 -136.2100      40.9        60       150        60
OIR    2025130    131400   -9.9200 -136.2400      40.8        60       149        60
OIR    2025130    131400   -9.9200 -136.2600      40.7        60       147        60
OIR    2025130    131400   -9.9200 -136.2700      40.6        59       147        60
OIR    2025130    131400   -9.9200 -136.2800      40.6        59       146        60
OIR    2025130    131400   -9.9200 -136.3400      40.0        58       147        60
OIR    2025130    131400   -9.9200 -136.3500      39.9        57       144        60
OIR    2025130    131400   -9.9200 -136.3600      39.9        57       143        60
OIR    2025130    131400   -9.9200 -136.3700      39.8        57       142        60
OIR    2025130    131400   -9.9200 -136.3800      39.8        57       140        60
OIR    2025130    131400   -9.9200 -136.3900      39.8        57       139        60
OIR    2025130    131400   -9.9200 -136.4000      39.8        57       138        60
OIR    2025130    131400   -9.9200 -136.4100      39.7        57       138        60
OIR    2025130    131400   -9.9200 -136.4200      39.7        57       140        60
OIR    2025130    131400   -9.9200 -136.4300      39.6        57       142        60
OIR    2025130    131400   -9.9200 -136.4400      39.3        56       145        60
OIR    2025130    131400   -9.9200 -136.4500      38.7        56       143        60
OIR    2025130    131400   -9.9200 -136.4600      38.1        55       138        60
OIR    2025130    131400   -9.9200 -136.4700      37.7        55       137        60
OIR    2025130    131400   -9.9200 -136.4800      37.4        55       135        60
OIR    2025130    131400   -9.9200 -136.4900      37.3        55       136        60
OIR    2025130    131400   -9.9200 -136.5000      37.2        55       137        60
OIR    2025130    131400   -9.9200 -136.5100      37.0        56       139        60
OIR    2025130    131400   -9.9200 -136.5200      37.0        56       139        60
OIR    2025130    131400   -9.9200 -136.5300      37.1        57       138        60
OIR    2025130    131400   -9.9200 -136.5400      37.1        57       136        60
OIR    2025130    131400   -9.9200 -136.5500      37.1        57       134        60
OIR    2025130    131400   -9.9200 -136.5600      37.1        58       133        60
OIR    2025130    131400   -9.9200 -136.5700      37.1        58       132        60
OIR    2025130    131400   -9.9200 -136.5800      37.1        58       132        60
OIR    2025130    131400   -9.9200 -136.5900      37.1        58       132        60
OIR    2025130    131400   -9.9200 -136.6000      37.1        58       128        60
OIR    2025130    131400   -9.9200 -136.6100      37.1        58       125        60
OIR    2025130    131400   -9.9200 -136.6200      37.2        58       126        60
OIR    2025130    131400   -9.9200 -136.6300      37.2        58       129        60
OIR    2025130    131400   -9.9200 -136.6400      37.1        58       132        60
OIR    2025130    131400   -9.9200 -136.6500      37.0        58       135        60
OIR    2025130    131400   -9.9200 -136.6600      36.9        58       137        60
OIR    2025130    131400   -9.9200 -136.6700      36.7        58       136        60
OIR    2025130    131400   -9.9200 -136.6800      35.1        55       134        60
OIR    2025130    131400   -9.9200 -136.6900      33.8        53       133        60
OIR    2025130    131400   -9.9200 -136.7000      33.3        51       131        60
OIR    2025130    131400   -9.9200 -136.7100      33.0        50       130        60
OIR    2025130    131400   -9.9200 -136.7200      33.0        50       129        60
OIR    2025130    131400   -9.9200 -136.7300      33.0        50       124        60
OIR    2025130    131400   -9.9200 -136.7400      33.0        50       121        60
OIR    2025130    131400   -9.9200 -136.7500      33.0        50       119        60
OIR    2025130    131400   -9.9200 -136.7600      33.0        50       120        60
OIR    2025130    131400   -9.9200 -136.7700      33.0        50       122        60
OIR    2025130    131400   -9.9200 -136.7800      33.0        50       125        60
OIR    2025130    131400   -9.9200 -136.7900      33.0        50       127        60
OIR    2025130    131400   -9.9200 -136.8000      33.0        50       130        60
OIR    2025130    131400   -9.9200 -136.8100      33.0        50       132        60
OIR    2025130    131400   -9.9200 -136.8200      33.0        50       129        60
OIR    2025130    131400   -9.9200 -136.8300      32.9        50       128        60
OIR    2025130    131400   -9.9200 -136.8400      32.9        50       133        60
OIR    2025130    131400   -9.9200 -136.8500      32.7        50       136        60
OIR    2025130    131400   -9.9200 -136.8600      31.9        49       136        60
OIR    2025130    131400   -9.9200 -136.8700      31.3        48       134        60
OIR    2025130    131400   -9.9200 -136.8800      30.9        48       127        60
OIR    2025130    131400   -9.9200 -136.8900      30.9        47       119        60
OIR    2025130    131400   -9.9200 -136.9000      30.9        47       112        60
OIR    2025130    131400   -9.9200 -136.9100      31.1        47       110        60
OIR    2025130    131400   -9.9200 -136.9200      31.1        46       107        60
OIR    2025130    131400   -9.9200 -136.9300      30.7        45       107        60
OIR    2025130    131400   -9.9200 -136.9400      30.2        43       105        60
OIR    2025130    131400   -9.9200 -136.9500      30.1        43       105        60
OIR    2025130    131400   -9.9200 -136.9600      30.1        43       105        60
OIR    2025130    131400   -9.9200 -136.9700      30.1        43       105        60
OIR    2025130    131400   -9.9200 -136.9800      30.2        43       107        60
OIR    2025130    131400   -9.9200 -136.9900      30.2        43       109        60
OIR    2025130    131400   -9.9200 -137.0000      30.2        43       112        60
OIR    2025130    131400   -9.9200 -137.0100      30.2        43       116        60
OIR    2025130    131400   -9.9200 -137.0200      30.2        43       115        60
OIR    2025130    131400   -9.9200 -137.0300      30.2        43       113        60
OIR    2025130    131400   -9.9200 -137.0400      30.2        43       110        60
OIR    2025130    131400   -9.9200 -137.0500      30.2        43       108        60
OIR    2025130    131400   -9.9200 -137.0600      30.2        43       107        60
OIR    2025130    131400   -9.9200 -137.0700      30.3        43       105        60
OIR    2025130    131400   -9.9200 -137.0800      30.3        43       105        60
OIR    2025130    131400   -9.9200 -137.0900      30.3        43       105        60
OIR    2025130    131400   -9.9200 -137.1000      30.3        43       105        60
OIR    2025130    131400   -9.9200 -137.1100      30.3        43       105        60
OIR    2025130    131400   -9.9200 -137.1200      30.3        43       107        60
OIR    2025130    131400   -9.9200 -137.1300      30.3        43       109        60
OIR    2025130    131400   -9.9200 -137.1400      30.4        43       110        60
OIR    2025130    131400   -9.9200 -137.1500      30.4        43       110        60
OIR    2025130    131400   -9.9200 -137.1600      30.4        43       109        60
OIR    2025130    131400   -9.9200 -137.1700      30.4        43       107        60
OIR    2025130    131400   -9.9200 -137.1800      30.4        43       105        60
OIR    2025130    131400   -9.9200 -137.1900      30.5        43       105        60
OIR    2025130    131400   -9.9200 -137.2000      31.9        45       105        60
OIR    2025130    131400   -9.9200 -137.2100      32.9        46       104        60
OIR    2025130    131400   -9.9200 -137.2200      33.4        46       104        60
OIR    2025130    131400   -9.9200 -137.2300      33.5        47       104        60
OIR    2025130    131400   -9.9200 -137.2400      33.7        47       104        60
OIR    2025130    131400   -9.9200 -137.2500      34.2        47       105        60
OIR    2025130    131400   -9.9200 -137.2600      35.1        47       104        60
OIR    2025130    131400   -9.9200 -137.2700      35.9        48       104        60
OIR    2025130    131400   -9.9200 -137.2800      36.3        48       104        60
OIR    2025130    131400   -9.9200 -137.2900      36.5        48       105        60
OIR    2025130    131400   -9.9200 -137.3000      36.5        48       108        60
OIR    2025130    131400   -9.9200 -137.3100      36.6        48       108        60
OIR    2025130    131400   -9.9200 -137.3200      36.6        48       104        60
OIR    2025130    131400   -9.9200 -137.3300      36.6        48       103        60
OIR    2025130    131400   -9.9200 -137.3400      36.5        47       103        60
OIR    2025130    131400   -9.9200 -137.3500      36.3        46       103        60
OIR    2025130    131400   -9.9200 -137.3600      35.5        44       103        60
OIR    2025130    131400   -9.9200 -137.3700      34.5        40       103        60
OIR    2025130    131400   -9.9200 -137.3800      33.9        36       103        60
OIR    2025130    131400   -9.9200 -137.3900      33.3        32       103        60
OIR    2025130    131400   -9.9200 -137.4000      33.1        31       103        60
OIR    2025130    131400   -9.9200 -137.4100      32.9        30       103        60
OIR    2025130    131400   -9.9200 -137.4200      32.8        29       103        60
OIR    2025130    131400   -9.9200 -137.4300      32.9        29       103        60
OIR    2025130    131400   -9.9200 -137.4400      33.0        28       103        60
OIR    2025130    131400   -9.9200 -137.4500      33.2        28       103        60
OIR    2025130    131400   -9.9200 -137.4600      33.4        27       103        60
OIR    2025130    131400   -9.9200 -137.4700      33.7        25       103        60
OIR    2025130    131400   -9.9200 -137.4800      34.2        23       103        60
OIR    2025130    131400   -9.9200 -137.4900      34.6        20       103        60
OIR    2025130    131400   -9.9200 -137.5000      35.0        17       103        60
OIR    2025130    131400   -9.9200 -137.5100      35.2        16       103        60
OIR    2025130    131400   -9.9200 -137.5200      35.3        15       103        60
OIR    2025130    131400   -9.9200 -137.5300      35.4        15       103        60
OIR    2025130    131400   -9.9200 -137.5400      35.5        14       103        60
OIR    2025130    131400   -9.9200 -137.5500      35.6        14       103        60
OIR    2025130    131400   -9.9200 -137.5600      35.7        14       103        60
OIR    2025130    131400   -9.9200 -137.5700      35.7        14       103        60
OIR    2025130    131400   -9.9200 -137.5800      35.7        13       103        60
OIR    2025130    131400   -9.9200 -137.5900      35.8        13       103        60
OIR    2025130    131400   -9.9200 -137.6000      35.8        13       103        60
OIR    2025130    131400   -9.9200 -137.6100      35.9        13       103        60
OIR    2025130    131400   -9.9200 -137.6200      35.9        12       103        60
OIR    2025130    131400   -9.9200 -137.6300      36.0        12       103        60
OIR    2025130    131400   -9.9200 -137.6400      36.0        11       103        60
OIR    2025130    131400   -9.9200 -137.6500      35.9        11       103        60
OIR    2025130    131400   -9.9200 -137.6600      35.9        10       104        60
OIR    2025130    131400   -9.9200 -137.6700      35.8        10       104        60
OIR    2025130    131400   -9.9200 -137.6800      35.8         9       104        60
OIR    2025130    131400   -9.9200 -137.6900      35.8         9       105        60
OIR    2025130    131400   -9.9200 -137.7000      35.8         9       104        60
OIR    2025130    131400   -9.9200 -137.7100      35.7         9       104        60
OIR    2025130    131400   -9.9200 -137.7200      35.5         8       108        60
OIR    2025130    131400   -9.9200 -137.7300      35.4         8       110        60
OIR    2025130    131400   -9.9200 -137.7400      35.1         7       109        60
OIR    2025130    131400   -9.9200 -137.7500      34.8         5       108        60
OIR    2025130    131400   -9.9200 -137.7600      34.5         4       105        60
OIR    2025130    131400   -9.9200 -137.7700      34.2         3       105        60
OIR    2025130    131400   -9.9200 -137.7800      33.8         1       105        60
OIR    2025130    131400   -9.9200 -137.7900      33.0       359       104        60
OIR    2025130    131400   -9.9200 -137.8000      32.6       357       104        60
OIR    2025130    131400   -9.9200 -137.8100      32.3       356       103        60
OIR    2025130    131400   -9.9200 -137.8200      32.0       355       103        60
OIR    2025130    131400   -9.9200 -137.8300      31.8       354       103        60
OIR    2025130    131400   -9.9200 -137.8400      31.7       353       103        60
OIR    2025130    131400   -9.9200 -137.8500      31.7       353       103        60
OIR    2025130    131400   -9.9200 -137.8600      31.7       352       103        60
OIR    2025130    131400   -9.9200 -137.8700      31.7       352       103        60
OIR    2025130    131400   -9.9200 -137.8800      31.7       352       103        60
OIR    2025130    131400   -9.9200 -137.8900      31.7       352       103        60
OIR    2025130    131400   -9.9200 -137.9000      31.7       352       104        60
OIR    2025130    131400   -9.9200 -137.9100      31.6       352       104        60
OIR    2025130    131400   -9.9200 -137.9200      31.6       352       105        60
OIR    2025130    131400   -9.9200 -137.9300      31.6       351       107        60
OIR    2025130    131400   -9.9200 -137.9400      31.5       351       108        60
OIR    2025130    131400   -9.9200 -137.9500      31.4       351       109        60
OIR    2025130    131400   -9.9200 -137.9600      31.3       350       111        60
OIR    2025130    131400   -9.9200 -137.9700      31.2       350       112        60
OIR    2025130    131400   -9.9200 -137.9800      31.1       350       112        60
OIR    2025130    131400   -9.9200 -137.9900      31.1       350       114        60
OIR    2025130    131400   -9.9200 -138.0000      31.1       350       115        60
OIR    2025130    131400   -9.9200 -138.0100      31.0       349       117        60
OIR    2025130    131400   -9.9200 -138.0200      31.0       349       121        60
OIR    2025130    131400   -9.9200 -138.0300      30.9       349       122        60
OIR    2025130    131400   -9.9200 -138.0400      30.9       349       123        60
OIR    2025130    131400   -9.9200 -138.0500      30.8       349       124        60
OIR    2025130    131400   -9.9200 -138.0600      30.8       348       126        60
OIR    2025130    131400   -9.9200 -138.0700      30.8       348       128        60
OIR    2025130    131400   -9.9200 -138.0800      30.8       347       129        60
OIR    2025130    131400   -9.9200 -138.0900      30.7       346       130        60
OIR    2025130    131400   -9.9200 -138.1000      30.7       345       132        60
OIR    2025130    131400   -9.9200 -138.1100      30.6       344       134        60
OIR    2025130    131400   -9.9200 -138.1200      30.6       342       137        60
OIR    2025130    131400   -9.9200 -138.1300      30.6       340       139        60
OIR    2025130    131400   -9.9200 -138.1400      30.4       339       137        60
OIR    2025130    131400   -9.9200 -138.1500      30.1       337       135        60
OIR    2025130    131400   -9.9200 -138.1600      29.8       336       134        60
OIR    2025130    131400   -9.9200 -138.1700      29.1       335       132        60
OIR    2025130    131400   -9.9200 -138.1800      27.6       333       134        60
OIR    2025130    131400   -9.9200 -138.1900      26.5       331       139        60
OIR    2025130    131400   -9.9200 -138.2000      25.7       329       146        60
OIR    2025130    131400   -9.9200 -138.2100      25.4       329       147        60
OIR    2025130    131400   -9.9200 -138.2200      25.4       329       147        60
OIR    2025130    131400   -9.9200 -138.2300      25.4       329       146        60
OIR    2025130    131400   -9.9200 -138.2400      25.4       329       145        60
OIR    2025130    131400   -9.9200 -138.2500      25.3       329       141        60
OIR    2025130    131400   -9.9200 -138.2600      25.3       329       139        60
OIR    2025130    131400   -9.9200 -138.2700      25.3       329       138        60
OIR    2025130    131400   -9.9200 -138.2800      25.3       329       138        60
OIR    2025130    131400   -9.9200 -138.2900      25.3       329       138        60
OIR    2025130    131400   -9.9200 -138.3000      25.3       329       137        60
OIR    2025130    131400   -9.9200 -138.3100      25.4       329       138        60
OIR    2025130    131400   -9.9200 -138.3200      25.4       329       137        60
OIR    2025130    131400   -9.9200 -138.3300      25.4       329       137        60
OIR    2025130    131400   -9.9200 -138.3400      25.4       329       138        60
OIR    2025130    131400   -9.9200 -138.3500      25.4       329       140        60
OIR    2025130    131400   -9.9200 -138.3600      25.4       329       139        60
OIR    2025130    131400   -9.9200 -138.3700      25.4       329       138        60
OIR    2025130    131400   -9.9200 -138.3800      25.4       329       135        60
OIR    2025130    131400   -9.9200 -138.3900      25.4       329       133        60
OIR    2025130    131400   -9.9200 -138.4000      25.5       329       134        60
OIR    2025130    131400   -9.9200 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9200 -138.4200      25.5       329       139        60
OIR    2025130    131400   -9.9200 -138.4300      25.5       330       142        60
OIR    2025130    131400   -9.9200 -138.4400      25.6       330       145        60
OIR    2025130    131400   -9.9200 -138.4500      25.6       332       145        60
OIR    2025130    131400   -9.9200 -138.4600      25.2       336       145        60
OIR    2025130    131400   -9.9300 -136.1700      40.6        60       146        60
OIR    2025130    131400   -9.9300 -136.1800      40.8        60       145        60
OIR    2025130    131400   -9.9300 -136.1900      40.9        60       146        60
OIR    2025130    131400   -9.9300 -136.2000      40.9        60       149        60
OIR    2025130    131400   -9.9300 -136.2700      40.7        59       147        60
OIR    2025130    131400   -9.9300 -136.2800      40.6        59       147        60
OIR    2025130    131400   -9.9300 -136.3500      40.0        57       146        60
OIR    2025130    131400   -9.9300 -136.3600      39.9        57       143        60
OIR    2025130    131400   -9.9300 -136.3700      39.9        57       141        60
OIR    2025130    131400   -9.9300 -136.3800      39.8        57       139        60
OIR    2025130    131400   -9.9300 -136.3900      39.8        57       137        60
OIR    2025130    131400   -9.9300 -136.4000      39.8        57       137        60
OIR    2025130    131400   -9.9300 -136.4100      39.7        57       138        60
OIR    2025130    131400   -9.9300 -136.4200      39.6        56       139        60
OIR    2025130    131400   -9.9300 -136.4300      39.5        56       140        60
OIR    2025130    131400   -9.9300 -136.4400      39.2        56       142        60
OIR    2025130    131400   -9.9300 -136.4500      38.7        55       141        60
OIR    2025130    131400   -9.9300 -136.4600      38.1        55       138        60
OIR    2025130    131400   -9.9300 -136.4700      37.8        55       136        60
OIR    2025130    131400   -9.9300 -136.4800      37.6        54       134        60
OIR    2025130    131400   -9.9300 -136.4900      37.4        55       136        60
OIR    2025130    131400   -9.9300 -136.5000      37.3        55       137        60
OIR    2025130    131400   -9.9300 -136.5100      37.1        55       141        60
OIR    2025130    131400   -9.9300 -136.5200      37.0        56       141        60
OIR    2025130    131400   -9.9300 -136.5300      37.1        56       139        60
OIR    2025130    131400   -9.9300 -136.5400      37.1        57       136        60
OIR    2025130    131400   -9.9300 -136.5500      37.1        57       134        60
OIR    2025130    131400   -9.9300 -136.5600      37.1        58       132        60
OIR    2025130    131400   -9.9300 -136.5700      37.1        58       130        60
OIR    2025130    131400   -9.9300 -136.5800      37.1        58       129        60
OIR    2025130    131400   -9.9300 -136.5900      37.1        58       128        60
OIR    2025130    131400   -9.9300 -136.6000      37.1        58       126        60
OIR    2025130    131400   -9.9300 -136.6100      37.2        58       125        60
OIR    2025130    131400   -9.9300 -136.6200      37.3        58       125        60
OIR    2025130    131400   -9.9300 -136.6300      37.3        58       127        60
OIR    2025130    131400   -9.9300 -136.6400      37.3        58       131        60
OIR    2025130    131400   -9.9300 -136.6500      37.1        58       134        60
OIR    2025130    131400   -9.9300 -136.6600      37.0        58       135        60
OIR    2025130    131400   -9.9300 -136.6700      36.6        57       134        60
OIR    2025130    131400   -9.9300 -136.6800      34.9        54       133        60
OIR    2025130    131400   -9.9300 -136.6900      33.6        52       132        60
OIR    2025130    131400   -9.9300 -136.7000      33.1        50       131        60
OIR    2025130    131400   -9.9300 -136.7100      33.0        50       130        60
OIR    2025130    131400   -9.9300 -136.7200      33.0        50       127        60
OIR    2025130    131400   -9.9300 -136.7300      33.0        50       122        60
OIR    2025130    131400   -9.9300 -136.7400      33.0        50       119        60
OIR    2025130    131400   -9.9300 -136.7500      33.0        50       116        60
OIR    2025130    131400   -9.9300 -136.7600      33.0        50       117        60
OIR    2025130    131400   -9.9300 -136.7700      33.0        50       121        60
OIR    2025130    131400   -9.9300 -136.7800      33.0        50       124        60
OIR    2025130    131400   -9.9300 -136.7900      33.0        50       127        60
OIR    2025130    131400   -9.9300 -136.8000      33.0        50       129        60
OIR    2025130    131400   -9.9300 -136.8100      33.0        50       130        60
OIR    2025130    131400   -9.9300 -136.8200      33.0        50       127        60
OIR    2025130    131400   -9.9300 -136.8300      32.9        50       125        60
OIR    2025130    131400   -9.9300 -136.8400      32.9        50       132        60
OIR    2025130    131400   -9.9300 -136.8500      32.9        50       135        60
OIR    2025130    131400   -9.9300 -136.8600      32.7        49       136        60
OIR    2025130    131400   -9.9300 -136.8700      32.3        49       137        60
OIR    2025130    131400   -9.9300 -136.8800      31.4        48       136        60
OIR    2025130    131400   -9.9300 -136.8900      31.3        48       128        60
OIR    2025130    131400   -9.9300 -136.9000      31.3        47       116        60
OIR    2025130    131400   -9.9300 -136.9100      31.4        47       113        60
OIR    2025130    131400   -9.9300 -136.9200      31.3        46       109        60
OIR    2025130    131400   -9.9300 -136.9300      30.9        45       108        60
OIR    2025130    131400   -9.9300 -136.9400      30.4        43       107        60
OIR    2025130    131400   -9.9300 -136.9500      30.2        43       107        60
OIR    2025130    131400   -9.9300 -136.9600      30.2        43       107        60
OIR    2025130    131400   -9.9300 -136.9700      30.2        43       107        60
OIR    2025130    131400   -9.9300 -136.9800      30.2        43       108        60
OIR    2025130    131400   -9.9300 -136.9900      30.2        43       110        60
OIR    2025130    131400   -9.9300 -137.0000      30.2        43       113        60
OIR    2025130    131400   -9.9300 -137.0100      30.2        43       116        60
OIR    2025130    131400   -9.9300 -137.0200      30.2        43       116        60
OIR    2025130    131400   -9.9300 -137.0300      30.2        43       115        60
OIR    2025130    131400   -9.9300 -137.0400      30.2        43       112        60
OIR    2025130    131400   -9.9300 -137.0500      30.2        43       109        60
OIR    2025130    131400   -9.9300 -137.0600      30.2        43       107        60
OIR    2025130    131400   -9.9300 -137.0700      30.3        43       105        60
OIR    2025130    131400   -9.9300 -137.0800      30.3        43       105        60
OIR    2025130    131400   -9.9300 -137.0900      30.3        43       105        60
OIR    2025130    131400   -9.9300 -137.1000      30.3        43       105        60
OIR    2025130    131400   -9.9300 -137.1100      30.3        43       105        60
OIR    2025130    131400   -9.9300 -137.1200      30.3        43       107        60
OIR    2025130    131400   -9.9300 -137.1300      30.3        43       109        60
OIR    2025130    131400   -9.9300 -137.1400      30.3        43       112        60
OIR    2025130    131400   -9.9300 -137.1500      30.4        43       112        60
OIR    2025130    131400   -9.9300 -137.1600      30.4        43       110        60
OIR    2025130    131400   -9.9300 -137.1700      30.4        43       107        60
OIR    2025130    131400   -9.9300 -137.1800      30.4        43       105        60
OIR    2025130    131400   -9.9300 -137.1900      30.7        43       107        60
OIR    2025130    131400   -9.9300 -137.2000      32.2        45       107        60
OIR    2025130    131400   -9.9300 -137.2100      33.0        46       104        60
OIR    2025130    131400   -9.9300 -137.2200      33.4        47       104        60
OIR    2025130    131400   -9.9300 -137.2300      33.6        47       104        60
OIR    2025130    131400   -9.9300 -137.2400      33.8        47       105        60
OIR    2025130    131400   -9.9300 -137.2500      34.2        47       108        60
OIR    2025130    131400   -9.9300 -137.2600      34.8        48       107        60
OIR    2025130    131400   -9.9300 -137.2700      35.6        48       107        60
OIR    2025130    131400   -9.9300 -137.2800      36.1        48       107        60
OIR    2025130    131400   -9.9300 -137.2900      36.4        48       108        60
OIR    2025130    131400   -9.9300 -137.3000      36.5        48       109        60
OIR    2025130    131400   -9.9300 -137.3100      36.5        48       108        60
OIR    2025130    131400   -9.9300 -137.3200      36.5        48       104        60
OIR    2025130    131400   -9.9300 -137.3300      36.5        47       104        60
OIR    2025130    131400   -9.9300 -137.3400      36.4        47       103        60
OIR    2025130    131400   -9.9300 -137.3500      36.0        46       103        60
OIR    2025130    131400   -9.9300 -137.3600      34.9        42       103        60
OIR    2025130    131400   -9.9300 -137.3700      33.6        36       103        60
OIR    2025130    131400   -9.9300 -137.3800      33.2        32       103        60
OIR    2025130    131400   -9.9300 -137.3900      33.1        30       103        60
OIR    2025130    131400   -9.9300 -137.4000      33.0        29       103        60
OIR    2025130    131400   -9.9300 -137.4100      33.0        29       103        60
OIR    2025130    131400   -9.9300 -137.4200      32.9        28       103        60
OIR    2025130    131400   -9.9300 -137.4300      32.9        28       103        60
OIR    2025130    131400   -9.9300 -137.4400      33.0        27       103        60
OIR    2025130    131400   -9.9300 -137.4500      33.2        27       103        60
OIR    2025130    131400   -9.9300 -137.4600      33.5        25       103        60
OIR    2025130    131400   -9.9300 -137.4700      33.9        23       103        60
OIR    2025130    131400   -9.9300 -137.4800      34.3        21       103        60
OIR    2025130    131400   -9.9300 -137.4900      34.8        18       103        60
OIR    2025130    131400   -9.9300 -137.5000      35.1        17       103        60
OIR    2025130    131400   -9.9300 -137.5100      35.2        16       103        60
OIR    2025130    131400   -9.9300 -137.5200      35.4        15       103        60
OIR    2025130    131400   -9.9300 -137.5300      35.5        14       103        60
OIR    2025130    131400   -9.9300 -137.5400      35.6        14       103        60
OIR    2025130    131400   -9.9300 -137.5500      35.6        14       103        60
OIR    2025130    131400   -9.9300 -137.5600      35.7        14       103        60
OIR    2025130    131400   -9.9300 -137.5700      35.7        13       103        60
OIR    2025130    131400   -9.9300 -137.5800      35.8        13       103        60
OIR    2025130    131400   -9.9300 -137.5900      35.8        13       103        60
OIR    2025130    131400   -9.9300 -137.6000      35.8        13       103        60
OIR    2025130    131400   -9.9300 -137.6100      35.9        12       103        60
OIR    2025130    131400   -9.9300 -137.6200      35.9        12       103        60
OIR    2025130    131400   -9.9300 -137.6300      36.0        11       103        60
OIR    2025130    131400   -9.9300 -137.6400      35.9        11       103        60
OIR    2025130    131400   -9.9300 -137.6500      35.9        10       103        60
OIR    2025130    131400   -9.9300 -137.6600      35.8        10       104        60
OIR    2025130    131400   -9.9300 -137.6700      35.7         9       105        60
OIR    2025130    131400   -9.9300 -137.6800      35.7         9       107        60
OIR    2025130    131400   -9.9300 -137.6900      35.7         9       107        60
OIR    2025130    131400   -9.9300 -137.7000      35.7         8       107        60
OIR    2025130    131400   -9.9300 -137.7100      35.5         8       107        60
OIR    2025130    131400   -9.9300 -137.7200      35.4         8       109        60
OIR    2025130    131400   -9.9300 -137.7300      35.2         7       111        60
OIR    2025130    131400   -9.9300 -137.7400      35.0         6       110        60
OIR    2025130    131400   -9.9300 -137.7500      34.7         5       109        60
OIR    2025130    131400   -9.9300 -137.7600      34.4         4       107        60
OIR    2025130    131400   -9.9300 -137.7700      33.9         2       107        60
OIR    2025130    131400   -9.9300 -137.7800      33.6         1       107        60
OIR    2025130    131400   -9.9300 -137.7900      32.7       357       105        60
OIR    2025130    131400   -9.9300 -137.8000      32.2       356       104        60
OIR    2025130    131400   -9.9300 -137.8100      31.9       355       104        60
OIR    2025130    131400   -9.9300 -137.8200      31.8       354       103        60
OIR    2025130    131400   -9.9300 -137.8300      31.6       354       103        60
OIR    2025130    131400   -9.9300 -137.8400      31.6       353       103        60
OIR    2025130    131400   -9.9300 -137.8500      31.6       353       103        60
OIR    2025130    131400   -9.9300 -137.8600      31.6       352       103        60
OIR    2025130    131400   -9.9300 -137.8700      31.6       352       103        60
OIR    2025130    131400   -9.9300 -137.8800      31.6       352       103        60
OIR    2025130    131400   -9.9300 -137.8900      31.6       352       103        60
OIR    2025130    131400   -9.9300 -137.9000      31.6       352       104        60
OIR    2025130    131400   -9.9300 -137.9100      31.6       352       104        60
OIR    2025130    131400   -9.9300 -137.9200      31.6       352       104        60
OIR    2025130    131400   -9.9300 -137.9300      31.5       351       104        60
OIR    2025130    131400   -9.9300 -137.9400      31.5       351       104        60
OIR    2025130    131400   -9.9300 -137.9500      31.3       351       107        60
OIR    2025130    131400   -9.9300 -137.9600      31.2       350       109        60
OIR    2025130    131400   -9.9300 -137.9700      31.1       350       112        60
OIR    2025130    131400   -9.9300 -137.9800      31.1       350       114        60
OIR    2025130    131400   -9.9300 -137.9900      31.0       350       115        60
OIR    2025130    131400   -9.9300 -138.0000      31.0       349       116        60
OIR    2025130    131400   -9.9300 -138.0100      30.9       349       117        60
OIR    2025130    131400   -9.9300 -138.0200      30.9       349       121        60
OIR    2025130    131400   -9.9300 -138.0300      30.8       349       123        60
OIR    2025130    131400   -9.9300 -138.0400      30.8       349       125        60
OIR    2025130    131400   -9.9300 -138.0500      30.7       348       127        60
OIR    2025130    131400   -9.9300 -138.0600      30.7       348       128        60
OIR    2025130    131400   -9.9300 -138.0700      30.7       348       130        60
OIR    2025130    131400   -9.9300 -138.0800      30.7       347       130        60
OIR    2025130    131400   -9.9300 -138.0900      30.8       346       130        60
OIR    2025130    131400   -9.9300 -138.1000      30.9       344       132        60
OIR    2025130    131400   -9.9300 -138.1100      31.0       343       135        60
OIR    2025130    131400   -9.9300 -138.1200      31.0       342       137        60
OIR    2025130    131400   -9.9300 -138.1300      30.8       341       139        60
OIR    2025130    131400   -9.9300 -138.1400      30.5       339       136        60
OIR    2025130    131400   -9.9300 -138.1500      30.2       338       134        60
OIR    2025130    131400   -9.9300 -138.1600      29.7       336       132        60
OIR    2025130    131400   -9.9300 -138.1700      28.7       334       131        60
OIR    2025130    131400   -9.9300 -138.1800      27.1       331       132        60
OIR    2025130    131400   -9.9300 -138.1900      26.0       329       136        60
OIR    2025130    131400   -9.9300 -138.2000      25.5       329       142        60
OIR    2025130    131400   -9.9300 -138.2100      25.4       329       144        60
OIR    2025130    131400   -9.9300 -138.2200      25.4       329       147        60
OIR    2025130    131400   -9.9300 -138.2300      25.4       329       148        60
OIR    2025130    131400   -9.9300 -138.2400      25.3       329       148        60
OIR    2025130    131400   -9.9300 -138.2500      25.3       329       143        60
OIR    2025130    131400   -9.9300 -138.2600      25.3       329       140        60
OIR    2025130    131400   -9.9300 -138.2700      25.3       329       139        60
OIR    2025130    131400   -9.9300 -138.2800      25.3       329       138        60
OIR    2025130    131400   -9.9300 -138.2900      25.3       329       138        60
OIR    2025130    131400   -9.9300 -138.3000      25.3       329       138        60
OIR    2025130    131400   -9.9300 -138.3100      25.3       329       138        60
OIR    2025130    131400   -9.9300 -138.3200      25.4       329       137        60
OIR    2025130    131400   -9.9300 -138.3300      25.4       329       137        60
OIR    2025130    131400   -9.9300 -138.3400      25.4       329       138        60
OIR    2025130    131400   -9.9300 -138.3500      25.4       329       139        60
OIR    2025130    131400   -9.9300 -138.3600      25.4       329       138        60
OIR    2025130    131400   -9.9300 -138.3700      25.4       329       136        60
OIR    2025130    131400   -9.9300 -138.3800      25.4       329       134        60
OIR    2025130    131400   -9.9300 -138.3900      25.4       329       133        60
OIR    2025130    131400   -9.9300 -138.4000      25.4       329       133        60
OIR    2025130    131400   -9.9300 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9300 -138.4200      25.5       329       139        60
OIR    2025130    131400   -9.9300 -138.4300      25.5       330       142        60
OIR    2025130    131400   -9.9300 -138.4400      25.5       331       145        60
OIR    2025130    131400   -9.9300 -138.4500      25.3       333       145        60
OIR    2025130    131400   -9.9300 -138.4600      24.9       338       144        60
OIR    2025130    131400   -9.9400 -136.1700      40.5        60       148        60
OIR    2025130    131400   -9.9400 -136.1800      40.6        60       147        60
OIR    2025130    131400   -9.9400 -136.1900      40.8        60       148        60
OIR    2025130    131400   -9.9400 -136.2000      40.8        60       149        60
OIR    2025130    131400   -9.9400 -136.2800      40.6        58       147        60
OIR    2025130    131400   -9.9400 -136.3500      40.0        57       145        60
OIR    2025130    131400   -9.9400 -136.3600      39.9        57       143        60
OIR    2025130    131400   -9.9400 -136.3700      39.9        57       141        60
OIR    2025130    131400   -9.9400 -136.3800      39.8        57       139        60
OIR    2025130    131400   -9.9400 -136.3900      39.8        57       137        60
OIR    2025130    131400   -9.9400 -136.4000      39.7        56       137        60
OIR    2025130    131400   -9.9400 -136.4100      39.7        56       138        60
OIR    2025130    131400   -9.9400 -136.4200      39.6        56       138        60
OIR    2025130    131400   -9.9400 -136.4300      39.3        55       139        60
OIR    2025130    131400   -9.9400 -136.4400      39.1        55       139        60
OIR    2025130    131400   -9.9400 -136.4500      38.7        54       139        60
OIR    2025130    131400   -9.9400 -136.4600      38.2        54       137        60
OIR    2025130    131400   -9.9400 -136.4700      38.0        54       135        60
OIR    2025130    131400   -9.9400 -136.4800      37.7        54       134        60
OIR    2025130    131400   -9.9400 -136.4900      37.6        54       135        60
OIR    2025130    131400   -9.9400 -136.5000      37.5        54       137        60
OIR    2025130    131400   -9.9400 -136.5100      37.2        54       140        60
OIR    2025130    131400   -9.9400 -136.5200      37.1        55       141        60
OIR    2025130    131400   -9.9400 -136.5300      37.1        55       138        60
OIR    2025130    131400   -9.9400 -136.5400      37.2        56       137        60
OIR    2025130    131400   -9.9400 -136.5500      37.2        57       136        60
OIR    2025130    131400   -9.9400 -136.5600      37.2        57       132        60
OIR    2025130    131400   -9.9400 -136.5700      37.2        58       128        60
OIR    2025130    131400   -9.9400 -136.5800      37.2        58       127        60
OIR    2025130    131400   -9.9400 -136.5900      37.2        58       125        60
OIR    2025130    131400   -9.9400 -136.6000      37.2        58       125        60
OIR    2025130    131400   -9.9400 -136.6100      37.3        58       125        60
OIR    2025130    131400   -9.9400 -136.6200      37.4        58       125        60
OIR    2025130    131400   -9.9400 -136.6300      37.4        58       128        60
OIR    2025130    131400   -9.9400 -136.6400      37.4        58       133        60
OIR    2025130    131400   -9.9400 -136.6500      37.3        58       136        60
OIR    2025130    131400   -9.9400 -136.6600      37.1        58       135        60
OIR    2025130    131400   -9.9400 -136.6700      36.4        57       133        60
OIR    2025130    131400   -9.9400 -136.6800      34.5        54       132        60
OIR    2025130    131400   -9.9400 -136.6900      33.4        51       131        60
OIR    2025130    131400   -9.9400 -136.7000      33.0        50       131        60
OIR    2025130    131400   -9.9400 -136.7100      33.0        50       129        60
OIR    2025130    131400   -9.9400 -136.7200      33.0        50       126        60
OIR    2025130    131400   -9.9400 -136.7300      33.0        50       121        60
OIR    2025130    131400   -9.9400 -136.7400      33.0        50       116        60
OIR    2025130    131400   -9.9400 -136.7500      33.0        50       116        60
OIR    2025130    131400   -9.9400 -136.7600      33.0        50       115        60
OIR    2025130    131400   -9.9400 -136.7700      33.0        50       119        60
OIR    2025130    131400   -9.9400 -136.7800      33.0        50       122        60
OIR    2025130    131400   -9.9400 -136.7900      33.0        50       125        60
OIR    2025130    131400   -9.9400 -136.8000      33.0        50       127        60
OIR    2025130    131400   -9.9400 -136.8100      33.0        50       129        60
OIR    2025130    131400   -9.9400 -136.8200      33.0        50       127        60
OIR    2025130    131400   -9.9400 -136.8300      32.9        50       125        60
OIR    2025130    131400   -9.9400 -136.8400      32.9        50       128        60
OIR    2025130    131400   -9.9400 -136.8500      32.9        50       131        60
OIR    2025130    131400   -9.9400 -136.8600      32.9        50       134        60
OIR    2025130    131400   -9.9400 -136.8700      32.9        49       136        60
OIR    2025130    131400   -9.9400 -136.8800      32.6        49       136        60
OIR    2025130    131400   -9.9400 -136.8900      31.6        48       132        60
OIR    2025130    131400   -9.9400 -136.9000      31.5        48       125        60
OIR    2025130    131400   -9.9400 -136.9100      31.4        47       119        60
OIR    2025130    131400   -9.9400 -136.9200      31.4        46       112        60
OIR    2025130    131400   -9.9400 -136.9300      31.0        45       110        60
OIR    2025130    131400   -9.9400 -136.9400      30.5        44       109        60
OIR    2025130    131400   -9.9400 -136.9500      30.2        43       108        60
OIR    2025130    131400   -9.9400 -136.9600      30.2        43       108        60
OIR    2025130    131400   -9.9400 -136.9700      30.2        43       108        60
OIR    2025130    131400   -9.9400 -136.9800      30.2        43       108        60
OIR    2025130    131400   -9.9400 -136.9900      30.2        43       111        60
OIR    2025130    131400   -9.9400 -137.0000      30.2        43       113        60
OIR    2025130    131400   -9.9400 -137.0100      30.2        43       115        60
OIR    2025130    131400   -9.9400 -137.0200      30.2        43       115        60
OIR    2025130    131400   -9.9400 -137.0300      30.2        42       116        60
OIR    2025130    131400   -9.9400 -137.0400      30.2        42       113        60
OIR    2025130    131400   -9.9400 -137.0500      30.2        42       110        60
OIR    2025130    131400   -9.9400 -137.0600      30.2        42       108        60
OIR    2025130    131400   -9.9400 -137.0700      30.3        42       105        60
OIR    2025130    131400   -9.9400 -137.0800      30.3        42       105        60
OIR    2025130    131400   -9.9400 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9400 -137.1000      30.3        42       105        60
OIR    2025130    131400   -9.9400 -137.1100      30.3        42       105        60
OIR    2025130    131400   -9.9400 -137.1200      30.3        43       107        60
OIR    2025130    131400   -9.9400 -137.1300      30.3        43       110        60
OIR    2025130    131400   -9.9400 -137.1400      30.3        43       113        60
OIR    2025130    131400   -9.9400 -137.1500      30.4        43       111        60
OIR    2025130    131400   -9.9400 -137.1600      30.4        43       109        60
OIR    2025130    131400   -9.9400 -137.1700      30.4        43       108        60
OIR    2025130    131400   -9.9400 -137.1800      30.4        43       108        60
OIR    2025130    131400   -9.9400 -137.1900      30.8        43       107        60
OIR    2025130    131400   -9.9400 -137.2000      32.2        46       105        60
OIR    2025130    131400   -9.9400 -137.2100      33.0        47       104        60
OIR    2025130    131400   -9.9400 -137.2200      33.3        47       104        60
OIR    2025130    131400   -9.9400 -137.2300      33.5        47       104        60
OIR    2025130    131400   -9.9400 -137.2400      33.8        47       105        60
OIR    2025130    131400   -9.9400 -137.2500      34.1        48       109        60
OIR    2025130    131400   -9.9400 -137.2600      34.5        48       109        60
OIR    2025130    131400   -9.9400 -137.2700      35.2        48       110        60
OIR    2025130    131400   -9.9400 -137.2800      35.8        48       109        60
OIR    2025130    131400   -9.9400 -137.2900      36.3        48       108        60
OIR    2025130    131400   -9.9400 -137.3000      36.4        48       108        60
OIR    2025130    131400   -9.9400 -137.3100      36.5        48       105        60
OIR    2025130    131400   -9.9400 -137.3200      36.5        47       104        60
OIR    2025130    131400   -9.9400 -137.3300      36.5        47       103        60
OIR    2025130    131400   -9.9400 -137.3400      36.2        46       103        60
OIR    2025130    131400   -9.9400 -137.3500      35.5        44       104        60
OIR    2025130    131400   -9.9400 -137.3600      34.2        39       104        60
OIR    2025130    131400   -9.9400 -137.3700      33.4        33       103        60
OIR    2025130    131400   -9.9400 -137.3800      33.2        30       103        60
OIR    2025130    131400   -9.9400 -137.3900      33.2        29       103        60
OIR    2025130    131400   -9.9400 -137.4000      33.2        28       103        60
OIR    2025130    131400   -9.9400 -137.4100      33.1        28       103        60
OIR    2025130    131400   -9.9400 -137.4200      33.0        27       103        60
OIR    2025130    131400   -9.9400 -137.4300      33.0        27       103        60
OIR    2025130    131400   -9.9400 -137.4400      33.1        26       103        60
OIR    2025130    131400   -9.9400 -137.4500      33.4        24       103        60
OIR    2025130    131400   -9.9400 -137.4600      33.8        23       103        60
OIR    2025130    131400   -9.9400 -137.4700      34.2        22       103        60
OIR    2025130    131400   -9.9400 -137.4800      34.5        20       103        60
OIR    2025130    131400   -9.9400 -137.4900      34.9        17       103        60
OIR    2025130    131400   -9.9400 -137.5000      35.3        16       103        60
OIR    2025130    131400   -9.9400 -137.5100      35.4        15       103        60
OIR    2025130    131400   -9.9400 -137.5200      35.5        15       103        60
OIR    2025130    131400   -9.9400 -137.5300      35.6        14       103        60
OIR    2025130    131400   -9.9400 -137.5400      35.6        14       103        60
OIR    2025130    131400   -9.9400 -137.5500      35.7        14       103        60
OIR    2025130    131400   -9.9400 -137.5600      35.7        13       103        60
OIR    2025130    131400   -9.9400 -137.5700      35.8        13       103        60
OIR    2025130    131400   -9.9400 -137.5800      35.8        13       103        60
OIR    2025130    131400   -9.9400 -137.5900      35.8        13       103        60
OIR    2025130    131400   -9.9400 -137.6000      35.8        12       103        60
OIR    2025130    131400   -9.9400 -137.6100      35.9        12       103        60
OIR    2025130    131400   -9.9400 -137.6200      35.9        11       103        60
OIR    2025130    131400   -9.9400 -137.6300      35.9        11       103        60
OIR    2025130    131400   -9.9400 -137.6400      35.9        10       103        60
OIR    2025130    131400   -9.9400 -137.6500      35.9        10       103        60
OIR    2025130    131400   -9.9400 -137.6600      35.8         9       104        60
OIR    2025130    131400   -9.9400 -137.6700      35.8         9       104        60
OIR    2025130    131400   -9.9400 -137.6800      35.7         8       104        60
OIR    2025130    131400   -9.9400 -137.6900      35.7         8       107        60
OIR    2025130    131400   -9.9400 -137.7000      35.6         8       107        60
OIR    2025130    131400   -9.9400 -137.7100      35.5         8       108        60
OIR    2025130    131400   -9.9400 -137.7200      35.3         7       110        60
OIR    2025130    131400   -9.9400 -137.7300      35.1         6       111        60
OIR    2025130    131400   -9.9400 -137.7400      34.9         6       111        60
OIR    2025130    131400   -9.9400 -137.7500      34.6         5       111        60
OIR    2025130    131400   -9.9400 -137.7600      34.3         4       109        60
OIR    2025130    131400   -9.9400 -137.7700      33.8         2       108        60
OIR    2025130    131400   -9.9400 -137.7800      33.2       360       108        60
OIR    2025130    131400   -9.9400 -137.7900      32.5       356       107        60
OIR    2025130    131400   -9.9400 -137.8000      32.1       355       105        60
OIR    2025130    131400   -9.9400 -137.8100      31.9       355       104        60
OIR    2025130    131400   -9.9400 -137.8200      31.7       354       104        60
OIR    2025130    131400   -9.9400 -137.8300      31.6       353       104        60
OIR    2025130    131400   -9.9400 -137.8400      31.5       353       104        60
OIR    2025130    131400   -9.9400 -137.8500      31.5       352       104        60
OIR    2025130    131400   -9.9400 -137.8600      31.5       352       104        60
OIR    2025130    131400   -9.9400 -137.8700      31.5       352       103        60
OIR    2025130    131400   -9.9400 -137.8800      31.5       352       103        60
OIR    2025130    131400   -9.9400 -137.8900      31.5       352       103        60
OIR    2025130    131400   -9.9400 -137.9000      31.5       352       104        60
OIR    2025130    131400   -9.9400 -137.9100      31.5       352       104        60
OIR    2025130    131400   -9.9400 -137.9200      31.5       352       104        60
OIR    2025130    131400   -9.9400 -137.9300      31.5       351       105        60
OIR    2025130    131400   -9.9400 -137.9400      31.4       351       105        60
OIR    2025130    131400   -9.9400 -137.9500      31.3       351       105        60
OIR    2025130    131400   -9.9400 -137.9600      31.2       350       109        60
OIR    2025130    131400   -9.9400 -137.9700      31.1       350       111        60
OIR    2025130    131400   -9.9400 -137.9800      31.0       350       113        60
OIR    2025130    131400   -9.9400 -137.9900      30.9       350       115        60
OIR    2025130    131400   -9.9400 -138.0000      30.9       349       116        60
OIR    2025130    131400   -9.9400 -138.0100      30.8       349       117        60
OIR    2025130    131400   -9.9400 -138.0200      30.8       349       120        60
OIR    2025130    131400   -9.9400 -138.0300      30.7       349       121        60
OIR    2025130    131400   -9.9400 -138.0400      30.7       349       123        60
OIR    2025130    131400   -9.9400 -138.0500      30.6       348       125        60
OIR    2025130    131400   -9.9400 -138.0600      30.7       348       126        60
OIR    2025130    131400   -9.9400 -138.0700      30.7       348       128        60
OIR    2025130    131400   -9.9400 -138.0800      30.8       347       130        60
OIR    2025130    131400   -9.9400 -138.0900      31.0       345       132        60
OIR    2025130    131400   -9.9400 -138.1000      31.1       344       133        60
OIR    2025130    131400   -9.9400 -138.1100      31.1       343       135        60
OIR    2025130    131400   -9.9400 -138.1200      31.1       342       135        60
OIR    2025130    131400   -9.9400 -138.1300      30.9       342       135        60
OIR    2025130    131400   -9.9400 -138.1400      30.7       340       133        60
OIR    2025130    131400   -9.9400 -138.1500      30.3       339       131        60
OIR    2025130    131400   -9.9400 -138.1600      29.8       337       130        60
OIR    2025130    131400   -9.9400 -138.1700      28.6       334       130        60
OIR    2025130    131400   -9.9400 -138.1800      27.0       331       130        60
OIR    2025130    131400   -9.9400 -138.1900      25.8       329       133        60
OIR    2025130    131400   -9.9400 -138.2000      25.5       329       138        60
OIR    2025130    131400   -9.9400 -138.2100      25.4       329       141        60
OIR    2025130    131400   -9.9400 -138.2200      25.4       329       144        60
OIR    2025130    131400   -9.9400 -138.2300      25.4       329       145        60
OIR    2025130    131400   -9.9400 -138.2400      25.4       329       146        60
OIR    2025130    131400   -9.9400 -138.2500      25.3       329       141        60
OIR    2025130    131400   -9.9400 -138.2600      25.3       329       139        60
OIR    2025130    131400   -9.9400 -138.2700      25.3       329       138        60
OIR    2025130    131400   -9.9400 -138.2800      25.3       329       138        60
OIR    2025130    131400   -9.9400 -138.2900      25.3       329       138        60
OIR    2025130    131400   -9.9400 -138.3000      25.3       329       137        60
OIR    2025130    131400   -9.9400 -138.3100      25.3       329       136        60
OIR    2025130    131400   -9.9400 -138.3200      25.4       329       135        60
OIR    2025130    131400   -9.9400 -138.3300      25.4       329       135        60
OIR    2025130    131400   -9.9400 -138.3400      25.4       329       136        60
OIR    2025130    131400   -9.9400 -138.3500      25.4       329       137        60
OIR    2025130    131400   -9.9400 -138.3600      25.4       329       135        60
OIR    2025130    131400   -9.9400 -138.3700      25.4       329       134        60
OIR    2025130    131400   -9.9400 -138.3800      25.4       329       132        60
OIR    2025130    131400   -9.9400 -138.3900      25.4       329       131        60
OIR    2025130    131400   -9.9400 -138.4000      25.4       329       133        60
OIR    2025130    131400   -9.9400 -138.4100      25.4       329       136        60
OIR    2025130    131400   -9.9400 -138.4200      25.4       330       140        60
OIR    2025130    131400   -9.9400 -138.4300      25.4       331       142        60
OIR    2025130    131400   -9.9400 -138.4400      25.3       332       143        60
OIR    2025130    131400   -9.9400 -138.4500      25.1       335       144        60
OIR    2025130    131400   -9.9400 -138.4600      24.8       339       145        60
OIR    2025130    131400   -9.9400 -138.4700      24.9       341       148        60
OIR    2025130    131400   -9.9500 -136.1700      40.3        59       149        60
OIR    2025130    131400   -9.9500 -136.2000      40.7        59       149        60
OIR    2025130    131400   -9.9500 -136.2100      40.8        59       150        60
OIR    2025130    131400   -9.9500 -136.2800      40.6        58       146        60
OIR    2025130    131400   -9.9500 -136.2900      40.6        58       146        60
OIR    2025130    131400   -9.9500 -136.3000      40.5        58       147        60
OIR    2025130    131400   -9.9500 -136.3500      40.0        57       144        60
OIR    2025130    131400   -9.9500 -136.3600      39.9        57       142        60
OIR    2025130    131400   -9.9500 -136.3700      39.8        57       141        60
OIR    2025130    131400   -9.9500 -136.3800      39.8        57       139        60
OIR    2025130    131400   -9.9500 -136.3900      39.7        56       137        60
OIR    2025130    131400   -9.9500 -136.4000      39.6        56       138        60
OIR    2025130    131400   -9.9500 -136.4100      39.5        55       138        60
OIR    2025130    131400   -9.9500 -136.4200      39.4        55       137        60
OIR    2025130    131400   -9.9500 -136.4300      39.1        55       137        60
OIR    2025130    131400   -9.9500 -136.4400      38.8        54       137        60
OIR    2025130    131400   -9.9500 -136.4500      38.5        54       137        60
OIR    2025130    131400   -9.9500 -136.4600      38.3        54       136        60
OIR    2025130    131400   -9.9500 -136.4700      38.0        54       135        60
OIR    2025130    131400   -9.9500 -136.4800      37.8        53       135        60
OIR    2025130    131400   -9.9500 -136.4900      37.7        53       135        60
OIR    2025130    131400   -9.9500 -136.5000      37.6        53       136        60
OIR    2025130    131400   -9.9500 -136.5100      37.4        54       139        60
OIR    2025130    131400   -9.9500 -136.5200      37.4        54       140        60
OIR    2025130    131400   -9.9500 -136.5300      37.4        54       138        60
OIR    2025130    131400   -9.9500 -136.5400      37.3        55       138        60
OIR    2025130    131400   -9.9500 -136.5500      37.2        56       138        60
OIR    2025130    131400   -9.9500 -136.5600      37.2        57       134        60
OIR    2025130    131400   -9.9500 -136.5700      37.2        58       127        60
OIR    2025130    131400   -9.9500 -136.5800      37.2        58       125        60
OIR    2025130    131400   -9.9500 -136.5900      37.2        58       123        60
OIR    2025130    131400   -9.9500 -136.6000      37.3        58       124        60
OIR    2025130    131400   -9.9500 -136.6100      37.4        58       125        60
OIR    2025130    131400   -9.9500 -136.6200      37.5        58       126        60
OIR    2025130    131400   -9.9500 -136.6300      37.5        59       130        60
OIR    2025130    131400   -9.9500 -136.6400      37.4        59       136        60
OIR    2025130    131400   -9.9500 -136.6500      37.3        59       139        60
OIR    2025130    131400   -9.9500 -136.6600      37.1        58       135        60
OIR    2025130    131400   -9.9500 -136.6700      36.0        57       133        60
OIR    2025130    131400   -9.9500 -136.6800      34.2        54       131        60
OIR    2025130    131400   -9.9500 -136.6900      33.3        51       130        60
OIR    2025130    131400   -9.9500 -136.7000      33.0        50       130        60
OIR    2025130    131400   -9.9500 -136.7100      33.0        50       127        60
OIR    2025130    131400   -9.9500 -136.7200      33.0        50       124        60
OIR    2025130    131400   -9.9500 -136.7300      33.0        50       120        60
OIR    2025130    131400   -9.9500 -136.7400      33.0        50       116        60
OIR    2025130    131400   -9.9500 -136.7500      33.0        50       114        60
OIR    2025130    131400   -9.9500 -136.7600      33.1        50       114        60
OIR    2025130    131400   -9.9500 -136.7700      33.1        50       116        60
OIR    2025130    131400   -9.9500 -136.7800      33.1        50       120        60
OIR    2025130    131400   -9.9500 -136.7900      33.1        50       123        60
OIR    2025130    131400   -9.9500 -136.8000      33.0        50       126        60
OIR    2025130    131400   -9.9500 -136.8100      33.0        50       129        60
OIR    2025130    131400   -9.9500 -136.8200      33.0        50       127        60
OIR    2025130    131400   -9.9500 -136.8300      32.9        50       125        60
OIR    2025130    131400   -9.9500 -136.8400      32.9        50       125        60
OIR    2025130    131400   -9.9500 -136.8500      32.9        50       127        60
OIR    2025130    131400   -9.9500 -136.8600      32.9        50       132        60
OIR    2025130    131400   -9.9500 -136.8700      32.9        50       134        60
OIR    2025130    131400   -9.9500 -136.8800      32.7        49       134        60
OIR    2025130    131400   -9.9500 -136.8900      31.6        48       133        60
OIR    2025130    131400   -9.9500 -136.9000      31.4        48       132        60
OIR    2025130    131400   -9.9500 -136.9100      31.3        47       123        60
OIR    2025130    131400   -9.9500 -136.9200      31.3        46       115        60
OIR    2025130    131400   -9.9500 -136.9300      30.9        44       112        60
OIR    2025130    131400   -9.9500 -136.9400      30.6        44       111        60
OIR    2025130    131400   -9.9500 -136.9500      30.2        43       110        60
OIR    2025130    131400   -9.9500 -136.9600      30.2        43       109        60
OIR    2025130    131400   -9.9500 -136.9700      30.2        43       108        60
OIR    2025130    131400   -9.9500 -136.9800      30.2        43       109        60
OIR    2025130    131400   -9.9500 -136.9900      30.2        43       111        60
OIR    2025130    131400   -9.9500 -137.0000      30.2        43       112        60
OIR    2025130    131400   -9.9500 -137.0100      30.2        43       112        60
OIR    2025130    131400   -9.9500 -137.0200      30.2        42       114        60
OIR    2025130    131400   -9.9500 -137.0300      30.2        42       116        60
OIR    2025130    131400   -9.9500 -137.0400      30.2        42       114        60
OIR    2025130    131400   -9.9500 -137.0500      30.2        42       111        60
OIR    2025130    131400   -9.9500 -137.0600      30.3        42       108        60
OIR    2025130    131400   -9.9500 -137.0700      30.3        42       107        60
OIR    2025130    131400   -9.9500 -137.0800      30.3        42       105        60
OIR    2025130    131400   -9.9500 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9500 -137.1000      30.3        42       104        60
OIR    2025130    131400   -9.9500 -137.1100      30.3        42       105        60
OIR    2025130    131400   -9.9500 -137.1200      30.3        42       107        60
OIR    2025130    131400   -9.9500 -137.1300      30.3        42       110        60
OIR    2025130    131400   -9.9500 -137.1400      30.3        42       113        60
OIR    2025130    131400   -9.9500 -137.1500      30.4        43       110        60
OIR    2025130    131400   -9.9500 -137.1600      30.4        43       108        60
OIR    2025130    131400   -9.9500 -137.1700      30.4        43       109        60
OIR    2025130    131400   -9.9500 -137.1800      30.5        43       108        60
OIR    2025130    131400   -9.9500 -137.1900      30.9        44       107        60
OIR    2025130    131400   -9.9500 -137.2000      32.1        46       104        60
OIR    2025130    131400   -9.9500 -137.2100      32.8        47       104        60
OIR    2025130    131400   -9.9500 -137.2200      33.2        48       104        60
OIR    2025130    131400   -9.9500 -137.2300      33.4        48       104        60
OIR    2025130    131400   -9.9500 -137.2400      33.6        48       107        60
OIR    2025130    131400   -9.9500 -137.2500      33.9        48       110        60
OIR    2025130    131400   -9.9500 -137.2600      34.3        49       111        60
OIR    2025130    131400   -9.9500 -137.2700      34.9        49       112        60
OIR    2025130    131400   -9.9500 -137.2800      35.6        49       110        60
OIR    2025130    131400   -9.9500 -137.2900      36.2        48       108        60
OIR    2025130    131400   -9.9500 -137.3000      36.3        48       105        60
OIR    2025130    131400   -9.9500 -137.3100      36.4        47       104        60
OIR    2025130    131400   -9.9500 -137.3200      36.5        47       103        60
OIR    2025130    131400   -9.9500 -137.3300      36.4        46       103        60
OIR    2025130    131400   -9.9500 -137.3400      36.0        44       104        60
OIR    2025130    131400   -9.9500 -137.3500      35.1        41       104        60
OIR    2025130    131400   -9.9500 -137.3600      34.0        35       104        60
OIR    2025130    131400   -9.9500 -137.3700      33.7        31       104        60
OIR    2025130    131400   -9.9500 -137.3800      33.5        29       103        60
OIR    2025130    131400   -9.9500 -137.3900      33.5        28       103        60
OIR    2025130    131400   -9.9500 -137.4000      33.4        28       103        60
OIR    2025130    131400   -9.9500 -137.4100      33.3        27       103        60
OIR    2025130    131400   -9.9500 -137.4200      33.3        26       103        60
OIR    2025130    131400   -9.9500 -137.4300      33.4        25       103        60
OIR    2025130    131400   -9.9500 -137.4400      33.4        24       103        60
OIR    2025130    131400   -9.9500 -137.4500      33.6        23       103        60
OIR    2025130    131400   -9.9500 -137.4600      33.9        22       103        60
OIR    2025130    131400   -9.9500 -137.4700      34.4        20       103        60
OIR    2025130    131400   -9.9500 -137.4800      34.7        18       103        60
OIR    2025130    131400   -9.9500 -137.4900      35.1        16       103        60
OIR    2025130    131400   -9.9500 -137.5000      35.4        15       103        60
OIR    2025130    131400   -9.9500 -137.5100      35.5        15       103        60
OIR    2025130    131400   -9.9500 -137.5200      35.6        14       103        60
OIR    2025130    131400   -9.9500 -137.5300      35.6        14       103        60
OIR    2025130    131400   -9.9500 -137.5400      35.7        14       103        60
OIR    2025130    131400   -9.9500 -137.5500      35.7        13       103        60
OIR    2025130    131400   -9.9500 -137.5600      35.7        13       103        60
OIR    2025130    131400   -9.9500 -137.5700      35.8        13       103        60
OIR    2025130    131400   -9.9500 -137.5800      35.8        12       103        60
OIR    2025130    131400   -9.9500 -137.5900      35.8        12       103        60
OIR    2025130    131400   -9.9500 -137.6000      35.8        11       103        60
OIR    2025130    131400   -9.9500 -137.6100      35.8        11       103        60
OIR    2025130    131400   -9.9500 -137.6200      35.9        10       103        60
OIR    2025130    131400   -9.9500 -137.6300      35.9        10       103        60
OIR    2025130    131400   -9.9500 -137.6400      35.9        10       103        60
OIR    2025130    131400   -9.9500 -137.6500      35.9         9       103        60
OIR    2025130    131400   -9.9500 -137.6600      35.9         8       103        60
OIR    2025130    131400   -9.9500 -137.6700      35.9         8       103        60
OIR    2025130    131400   -9.9500 -137.6800      35.8         8       104        60
OIR    2025130    131400   -9.9500 -137.6900      35.8         7       105        60
OIR    2025130    131400   -9.9500 -137.7000      35.7         7       108        60
OIR    2025130    131400   -9.9500 -137.7100      35.5         7       109        60
OIR    2025130    131400   -9.9500 -137.7200      35.3         6       110        60
OIR    2025130    131400   -9.9500 -137.7300      35.1         6       111        60
OIR    2025130    131400   -9.9500 -137.7400      34.9         5       112        60
OIR    2025130    131400   -9.9500 -137.7500      34.6         4       112        60
OIR    2025130    131400   -9.9500 -137.7600      34.2         3       110        60
OIR    2025130    131400   -9.9500 -137.7700      33.6         1       109        60
OIR    2025130    131400   -9.9500 -137.7800      33.1       358       108        60
OIR    2025130    131400   -9.9500 -137.7900      32.5       356       108        60
OIR    2025130    131400   -9.9500 -137.8000      32.1       355       107        60
OIR    2025130    131400   -9.9500 -137.8100      31.9       354       105        60
OIR    2025130    131400   -9.9500 -137.8200      31.7       354       104        60
OIR    2025130    131400   -9.9500 -137.8300      31.6       353       104        60
OIR    2025130    131400   -9.9500 -137.8400      31.5       353       105        60
OIR    2025130    131400   -9.9500 -137.8500      31.5       352       105        60
OIR    2025130    131400   -9.9500 -137.8600      31.5       352       105        60
OIR    2025130    131400   -9.9500 -137.8700      31.5       352       104        60
OIR    2025130    131400   -9.9500 -137.8800      31.5       352       104        60
OIR    2025130    131400   -9.9500 -137.8900      31.5       352       103        60
OIR    2025130    131400   -9.9500 -137.9000      31.5       352       104        60
OIR    2025130    131400   -9.9500 -137.9100      31.5       352       104        60
OIR    2025130    131400   -9.9500 -137.9200      31.5       352       105        60
OIR    2025130    131400   -9.9500 -137.9300      31.4       351       107        60
OIR    2025130    131400   -9.9500 -137.9400      31.4       351       105        60
OIR    2025130    131400   -9.9500 -137.9500      31.3       351       105        60
OIR    2025130    131400   -9.9500 -137.9600      31.2       350       108        60
OIR    2025130    131400   -9.9500 -137.9700      31.0       350       111        60
OIR    2025130    131400   -9.9500 -137.9800      30.9       350       113        60
OIR    2025130    131400   -9.9500 -137.9900      30.9       350       114        60
OIR    2025130    131400   -9.9500 -138.0000      30.8       349       116        60
OIR    2025130    131400   -9.9500 -138.0100      30.7       349       117        60
OIR    2025130    131400   -9.9500 -138.0200      30.7       349       119        60
OIR    2025130    131400   -9.9500 -138.0300      30.6       349       120        60
OIR    2025130    131400   -9.9500 -138.0400      30.6       348       121        60
OIR    2025130    131400   -9.9500 -138.0500      30.6       348       123        60
OIR    2025130    131400   -9.9500 -138.0600      30.6       348       124        60
OIR    2025130    131400   -9.9500 -138.0700      30.7       347       127        60
OIR    2025130    131400   -9.9500 -138.0800      30.8       346       129        60
OIR    2025130    131400   -9.9500 -138.0900      30.9       345       131        60
OIR    2025130    131400   -9.9500 -138.1000      31.0       344       132        60
OIR    2025130    131400   -9.9500 -138.1100      30.9       343       133        60
OIR    2025130    131400   -9.9500 -138.1200      30.9       342       132        60
OIR    2025130    131400   -9.9500 -138.1300      30.8       342       131        60
OIR    2025130    131400   -9.9500 -138.1400      30.6       341       129        60
OIR    2025130    131400   -9.9500 -138.1500      30.3       340       128        60
OIR    2025130    131400   -9.9500 -138.1600      29.6       339       128        60
OIR    2025130    131400   -9.9500 -138.1700      28.6       336       128        60
OIR    2025130    131400   -9.9500 -138.1800      27.0       332       129        60
OIR    2025130    131400   -9.9500 -138.1900      25.9       329       131        60
OIR    2025130    131400   -9.9500 -138.2000      25.5       329       135        60
OIR    2025130    131400   -9.9500 -138.2100      25.4       329       138        60
OIR    2025130    131400   -9.9500 -138.2200      25.4       329       141        60
OIR    2025130    131400   -9.9500 -138.2300      25.4       329       142        60
OIR    2025130    131400   -9.9500 -138.2400      25.4       329       142        60
OIR    2025130    131400   -9.9500 -138.2500      25.3       329       139        60
OIR    2025130    131400   -9.9500 -138.2600      25.3       329       137        60
OIR    2025130    131400   -9.9500 -138.2700      25.3       329       137        60
OIR    2025130    131400   -9.9500 -138.2800      25.3       329       136        60
OIR    2025130    131400   -9.9500 -138.2900      25.3       329       137        60
OIR    2025130    131400   -9.9500 -138.3000      25.3       329       136        60
OIR    2025130    131400   -9.9500 -138.3100      25.3       329       134        60
OIR    2025130    131400   -9.9500 -138.3200      25.4       329       134        60
OIR    2025130    131400   -9.9500 -138.3300      25.4       329       133        60
OIR    2025130    131400   -9.9500 -138.3400      25.4       329       134        60
OIR    2025130    131400   -9.9500 -138.3500      25.4       329       135        60
OIR    2025130    131400   -9.9500 -138.3600      25.4       329       133        60
OIR    2025130    131400   -9.9500 -138.3700      25.4       329       132        60
OIR    2025130    131400   -9.9500 -138.3800      25.4       329       131        60
OIR    2025130    131400   -9.9500 -138.3900      25.4       329       131        60
OIR    2025130    131400   -9.9500 -138.4000      25.5       329       133        60
OIR    2025130    131400   -9.9500 -138.4100      25.5       329       137        60
OIR    2025130    131400   -9.9500 -138.4200      25.4       330       141        60
OIR    2025130    131400   -9.9500 -138.4300      25.3       332       142        60
OIR    2025130    131400   -9.9500 -138.4400      25.1       333       143        60
OIR    2025130    131400   -9.9500 -138.4500      25.0       336       144        60
OIR    2025130    131400   -9.9500 -138.4600      24.9       338       146        60
OIR    2025130    131400   -9.9500 -138.4700      24.9       340       148        60
OIR    2025130    131400   -9.9600 -136.2000      40.6        59       149        60
OIR    2025130    131400   -9.9600 -136.2800      40.7        58       147        60
OIR    2025130    131400   -9.9600 -136.2900      40.6        58       147        60
OIR    2025130    131400   -9.9600 -136.3300      40.3        57       147        60
OIR    2025130    131400   -9.9600 -136.3400      40.2        57       145        60
OIR    2025130    131400   -9.9600 -136.3500      40.1        57       143        60
OIR    2025130    131400   -9.9600 -136.3600      39.9        57       142        60
OIR    2025130    131400   -9.9600 -136.3700      39.7        56       141        60
OIR    2025130    131400   -9.9600 -136.3800      39.6        56       141        60
OIR    2025130    131400   -9.9600 -136.3900      39.5        56       140        60
OIR    2025130    131400   -9.9600 -136.4000      39.5        55       139        60
OIR    2025130    131400   -9.9600 -136.4100      39.3        55       138        60
OIR    2025130    131400   -9.9600 -136.4200      39.1        54       136        60
OIR    2025130    131400   -9.9600 -136.4300      38.8        54       136        60
OIR    2025130    131400   -9.9600 -136.4400      38.7        54       136        60
OIR    2025130    131400   -9.9600 -136.4500      38.5        54       136        60
OIR    2025130    131400   -9.9600 -136.4600      38.3        53       136        60
OIR    2025130    131400   -9.9600 -136.4700      38.1        53       135        60
OIR    2025130    131400   -9.9600 -136.4800      37.9        53       135        60
OIR    2025130    131400   -9.9600 -136.4900      37.8        53       135        60
OIR    2025130    131400   -9.9600 -136.5000      37.7        53       136        60
OIR    2025130    131400   -9.9600 -136.5100      37.7        53       139        60
OIR    2025130    131400   -9.9600 -136.5200      37.7        53       140        60
OIR    2025130    131400   -9.9600 -136.5300      37.8        53       138        60
OIR    2025130    131400   -9.9600 -136.5400      37.8        54       137        60
OIR    2025130    131400   -9.9600 -136.5500      37.6        55       137        60
OIR    2025130    131400   -9.9600 -136.5600      37.3        56       134        60
OIR    2025130    131400   -9.9600 -136.5700      37.2        57       130        60
OIR    2025130    131400   -9.9600 -136.5800      37.3        57       129        60
OIR    2025130    131400   -9.9600 -136.5900      37.3        58       128        60
OIR    2025130    131400   -9.9600 -136.6000      37.4        58       128        60
OIR    2025130    131400   -9.9600 -136.6100      37.5        58       128        60
OIR    2025130    131400   -9.9600 -136.6200      37.5        59       128        60
OIR    2025130    131400   -9.9600 -136.6300      37.5        59       132        60
OIR    2025130    131400   -9.9600 -136.6400      37.5        59       137        60
OIR    2025130    131400   -9.9600 -136.6500      37.4        59       137        60
OIR    2025130    131400   -9.9600 -136.6600      37.0        58       135        60
OIR    2025130    131400   -9.9600 -136.6700      35.5        57       132        60
OIR    2025130    131400   -9.9600 -136.6800      34.0        53       129        60
OIR    2025130    131400   -9.9600 -136.6900      33.2        51       129        60
OIR    2025130    131400   -9.9600 -136.7000      33.0        50       128        60
OIR    2025130    131400   -9.9600 -136.7100      33.0        50       126        60
OIR    2025130    131400   -9.9600 -136.7200      33.0        50       123        60
OIR    2025130    131400   -9.9600 -136.7300      33.0        50       119        60
OIR    2025130    131400   -9.9600 -136.7400      33.0        50       116        60
OIR    2025130    131400   -9.9600 -136.7500      33.1        50       115        60
OIR    2025130    131400   -9.9600 -136.7600      33.1        50       116        60
OIR    2025130    131400   -9.9600 -136.7700      33.1        50       117        60
OIR    2025130    131400   -9.9600 -136.7800      33.1        50       120        60
OIR    2025130    131400   -9.9600 -136.7900      33.1        50       123        60
OIR    2025130    131400   -9.9600 -136.8000      33.1        50       125        60
OIR    2025130    131400   -9.9600 -136.8100      33.0        50       128        60
OIR    2025130    131400   -9.9600 -136.8200      32.9        50       126        60
OIR    2025130    131400   -9.9600 -136.8300      32.9        50       123        60
OIR    2025130    131400   -9.9600 -136.8400      32.9        50       122        60
OIR    2025130    131400   -9.9600 -136.8500      32.9        50       124        60
OIR    2025130    131400   -9.9600 -136.8600      32.9        50       129        60
OIR    2025130    131400   -9.9600 -136.8700      32.8        50       132        60
OIR    2025130    131400   -9.9600 -136.8800      32.5        49       133        60
OIR    2025130    131400   -9.9600 -136.8900      31.5        49       132        60
OIR    2025130    131400   -9.9600 -136.9000      31.3        48       129        60
OIR    2025130    131400   -9.9600 -136.9100      31.2        48       122        60
OIR    2025130    131400   -9.9600 -136.9200      31.0        46       114        60
OIR    2025130    131400   -9.9600 -136.9300      30.8        44       112        60
OIR    2025130    131400   -9.9600 -136.9400      30.5        43       110        60
OIR    2025130    131400   -9.9600 -136.9500      30.2        42       109        60
OIR    2025130    131400   -9.9600 -136.9600      30.2        42       109        60
OIR    2025130    131400   -9.9600 -136.9700      30.2        42       109        60
OIR    2025130    131400   -9.9600 -136.9800      30.2        43       110        60
OIR    2025130    131400   -9.9600 -136.9900      30.2        43       112        60
OIR    2025130    131400   -9.9600 -137.0000      30.2        42       113        60
OIR    2025130    131400   -9.9600 -137.0100      30.2        42       113        60
OIR    2025130    131400   -9.9600 -137.0200      30.2        42       115        60
OIR    2025130    131400   -9.9600 -137.0300      30.2        42       116        60
OIR    2025130    131400   -9.9600 -137.0400      30.2        42       113        60
OIR    2025130    131400   -9.9600 -137.0500      30.3        42       110        60
OIR    2025130    131400   -9.9600 -137.0600      30.3        42       108        60
OIR    2025130    131400   -9.9600 -137.0700      30.3        42       107        60
OIR    2025130    131400   -9.9600 -137.0800      30.3        42       105        60
OIR    2025130    131400   -9.9600 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9600 -137.1000      30.3        42       104        60
OIR    2025130    131400   -9.9600 -137.1100      30.3        42       105        60
OIR    2025130    131400   -9.9600 -137.1200      30.3        42       107        60
OIR    2025130    131400   -9.9600 -137.1300      30.3        42       110        60
OIR    2025130    131400   -9.9600 -137.1400      30.4        42       112        60
OIR    2025130    131400   -9.9600 -137.1500      30.4        42       110        60
OIR    2025130    131400   -9.9600 -137.1600      30.4        42       107        60
OIR    2025130    131400   -9.9600 -137.1700      30.4        43       107        60
OIR    2025130    131400   -9.9600 -137.1800      30.6        43       107        60
OIR    2025130    131400   -9.9600 -137.1900      31.2        45       104        60
OIR    2025130    131400   -9.9600 -137.2000      32.0        47       104        60
OIR    2025130    131400   -9.9600 -137.2100      32.8        48       104        60
OIR    2025130    131400   -9.9600 -137.2200      33.1        48       104        60
OIR    2025130    131400   -9.9600 -137.2300      33.2        48       104        60
OIR    2025130    131400   -9.9600 -137.2400      33.4        49       108        60
OIR    2025130    131400   -9.9600 -137.2500      33.6        49       111        60
OIR    2025130    131400   -9.9600 -137.2600      33.9        49       114        60
OIR    2025130    131400   -9.9600 -137.2700      34.4        49       114        60
OIR    2025130    131400   -9.9600 -137.2800      35.1        49       109        60
OIR    2025130    131400   -9.9600 -137.2900      36.0        48       107        60
OIR    2025130    131400   -9.9600 -137.3000      36.3        47       105        60
OIR    2025130    131400   -9.9600 -137.3100      36.4        47       104        60
OIR    2025130    131400   -9.9600 -137.3200      36.5        46       103        60
OIR    2025130    131400   -9.9600 -137.3300      36.3        44       103        60
OIR    2025130    131400   -9.9600 -137.3400      35.9        42       103        60
OIR    2025130    131400   -9.9600 -137.3500      35.0        37       104        60
OIR    2025130    131400   -9.9600 -137.3600      34.2        32       104        60
OIR    2025130    131400   -9.9600 -137.3700      34.0        29       103        60
OIR    2025130    131400   -9.9600 -137.3800      33.9        28       103        60
OIR    2025130    131400   -9.9600 -137.3900      33.8        28       103        60
OIR    2025130    131400   -9.9600 -137.4000      33.6        27       103        60
OIR    2025130    131400   -9.9600 -137.4100      33.5        26       103        60
OIR    2025130    131400   -9.9600 -137.4200      33.4        25       103        60
OIR    2025130    131400   -9.9600 -137.4300      33.4        24       103        60
OIR    2025130    131400   -9.9600 -137.4400      33.5        23       103        60
OIR    2025130    131400   -9.9600 -137.4500      33.7        22       103        60
OIR    2025130    131400   -9.9600 -137.4600      34.0        21       103        60
OIR    2025130    131400   -9.9600 -137.4700      34.6        18       103        60
OIR    2025130    131400   -9.9600 -137.4800      35.1        16       103        60
OIR    2025130    131400   -9.9600 -137.4900      35.3        15       103        60
OIR    2025130    131400   -9.9600 -137.5000      35.5        14       103        60
OIR    2025130    131400   -9.9600 -137.5100      35.5        14       103        60
OIR    2025130    131400   -9.9600 -137.5200      35.6        14       103        60
OIR    2025130    131400   -9.9600 -137.5300      35.7        14       103        60
OIR    2025130    131400   -9.9600 -137.5400      35.7        13       103        60
OIR    2025130    131400   -9.9600 -137.5500      35.8        13       103        60
OIR    2025130    131400   -9.9600 -137.5600      35.8        13       103        60
OIR    2025130    131400   -9.9600 -137.5700      35.8        12       103        60
OIR    2025130    131400   -9.9600 -137.5800      35.8        12       103        60
OIR    2025130    131400   -9.9600 -137.5900      35.8        11       103        60
OIR    2025130    131400   -9.9600 -137.6000      35.8        10       103        60
OIR    2025130    131400   -9.9600 -137.6100      35.8        10       103        60
OIR    2025130    131400   -9.9600 -137.6200      35.8        10       103        60
OIR    2025130    131400   -9.9600 -137.6300      35.8         9       103        60
OIR    2025130    131400   -9.9600 -137.6400      35.9         9       103        60
OIR    2025130    131400   -9.9600 -137.6500      35.9         8       103        60
OIR    2025130    131400   -9.9600 -137.6600      35.9         8       103        60
OIR    2025130    131400   -9.9600 -137.6700      35.9         8       103        60
OIR    2025130    131400   -9.9600 -137.6800      35.9         7       104        60
OIR    2025130    131400   -9.9600 -137.6900      35.8         7       105        60
OIR    2025130    131400   -9.9600 -137.7000      35.7         7       107        60
OIR    2025130    131400   -9.9600 -137.7100      35.6         6       108        60
OIR    2025130    131400   -9.9600 -137.7200      35.5         6       109        60
OIR    2025130    131400   -9.9600 -137.7300      35.4         5       110        60
OIR    2025130    131400   -9.9600 -137.7400      35.3         5       111        60
OIR    2025130    131400   -9.9600 -137.7500      35.1         4       110        60
OIR    2025130    131400   -9.9600 -137.7600      34.7         3       108        60
OIR    2025130    131400   -9.9600 -137.7700      33.8       360       108        60
OIR    2025130    131400   -9.9600 -137.7800      33.2       357       107        60
OIR    2025130    131400   -9.9600 -137.7900      32.7       355       107        60
OIR    2025130    131400   -9.9600 -137.8000      32.3       354       107        60
OIR    2025130    131400   -9.9600 -137.8100      32.0       354       107        60
OIR    2025130    131400   -9.9600 -137.8200      31.8       354       107        60
OIR    2025130    131400   -9.9600 -137.8300      31.7       353       108        60
OIR    2025130    131400   -9.9600 -137.8400      31.6       353       108        60
OIR    2025130    131400   -9.9600 -137.8500      31.5       352       108        60
OIR    2025130    131400   -9.9600 -137.8600      31.5       352       107        60
OIR    2025130    131400   -9.9600 -137.8700      31.5       352       105        60
OIR    2025130    131400   -9.9600 -137.8800      31.5       352       105        60
OIR    2025130    131400   -9.9600 -137.8900      31.5       352       105        60
OIR    2025130    131400   -9.9600 -137.9000      31.5       352       105        60
OIR    2025130    131400   -9.9600 -137.9100      31.4       352       105        60
OIR    2025130    131400   -9.9600 -137.9200      31.4       351       104        60
OIR    2025130    131400   -9.9600 -137.9300      31.4       351       104        60
OIR    2025130    131400   -9.9600 -137.9400      31.4       351       105        60
OIR    2025130    131400   -9.9600 -137.9500      31.2       351       105        60
OIR    2025130    131400   -9.9600 -137.9600      31.1       350       109        60
OIR    2025130    131400   -9.9600 -137.9700      31.0       350       111        60
OIR    2025130    131400   -9.9600 -137.9800      30.9       350       113        60
OIR    2025130    131400   -9.9600 -137.9900      30.8       349       114        60
OIR    2025130    131400   -9.9600 -138.0000      30.7       349       115        60
OIR    2025130    131400   -9.9600 -138.0100      30.6       349       116        60
OIR    2025130    131400   -9.9600 -138.0200      30.6       349       116        60
OIR    2025130    131400   -9.9600 -138.0300      30.5       349       117        60
OIR    2025130    131400   -9.9600 -138.0400      30.5       348       120        60
OIR    2025130    131400   -9.9600 -138.0500      30.5       348       123        60
OIR    2025130    131400   -9.9600 -138.0600      30.6       348       125        60
OIR    2025130    131400   -9.9600 -138.0700      30.6       347       126        60
OIR    2025130    131400   -9.9600 -138.0800      30.7       346       127        60
OIR    2025130    131400   -9.9600 -138.0900      30.8       345       128        60
OIR    2025130    131400   -9.9600 -138.1000      30.8       344       129        60
OIR    2025130    131400   -9.9600 -138.1100      30.8       343       129        60
OIR    2025130    131400   -9.9600 -138.1200      30.7       342       128        60
OIR    2025130    131400   -9.9600 -138.1300      30.6       342       128        60
OIR    2025130    131400   -9.9600 -138.1400      30.4       341       126        60
OIR    2025130    131400   -9.9600 -138.1500      30.1       340       125        60
OIR    2025130    131400   -9.9600 -138.1600      29.8       339       125        60
OIR    2025130    131400   -9.9600 -138.1700      29.3       339       126        60
OIR    2025130    131400   -9.9600 -138.1800      28.6       337       128        60
OIR    2025130    131400   -9.9600 -138.1900      27.1       334       130        60
OIR    2025130    131400   -9.9600 -138.2000      25.7       330       134        60
OIR    2025130    131400   -9.9600 -138.2100      25.7       330       137        60
OIR    2025130    131400   -9.9600 -138.2200      25.4       330       140        60
OIR    2025130    131400   -9.9600 -138.2300      25.6       330       140        60
OIR    2025130    131400   -9.9600 -138.2400      25.5       329       138        60
OIR    2025130    131400   -9.9600 -138.2500      25.4       329       136        60
OIR    2025130    131400   -9.9600 -138.2600      25.4       329       135        60
OIR    2025130    131400   -9.9600 -138.2700      25.4       329       135        60
OIR    2025130    131400   -9.9600 -138.2800      25.4       329       135        60
OIR    2025130    131400   -9.9600 -138.2900      25.4       329       135        60
OIR    2025130    131400   -9.9600 -138.3000      25.4       329       134        60
OIR    2025130    131400   -9.9600 -138.3100      25.4       329       133        60
OIR    2025130    131400   -9.9600 -138.3200      25.4       329       133        60
OIR    2025130    131400   -9.9600 -138.3300      25.4       329       132        60
OIR    2025130    131400   -9.9600 -138.3400      25.4       329       132        60
OIR    2025130    131400   -9.9600 -138.3500      25.4       329       133        60
OIR    2025130    131400   -9.9600 -138.3600      25.4       329       132        60
OIR    2025130    131400   -9.9600 -138.3700      25.4       329       131        60
OIR    2025130    131400   -9.9600 -138.3800      25.5       329       131        60
OIR    2025130    131400   -9.9600 -138.3900      25.5       329       131        60
OIR    2025130    131400   -9.9600 -138.4000      25.5       329       134        60
OIR    2025130    131400   -9.9600 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9600 -138.4200      25.4       331       140        60
OIR    2025130    131400   -9.9600 -138.4300      25.2       332       141        60
OIR    2025130    131400   -9.9600 -138.4400      25.1       334       143        60
OIR    2025130    131400   -9.9600 -138.4500      25.1       336       145        60
OIR    2025130    131400   -9.9600 -138.4600      25.0       338       147        60
OIR    2025130    131400   -9.9700 -136.1900      40.4        59       149        60
OIR    2025130    131400   -9.9700 -136.2000      40.5        59       149        60
OIR    2025130    131400   -9.9700 -136.2700      40.7        58       147        60
OIR    2025130    131400   -9.9700 -136.2800      40.7        58       147        60
OIR    2025130    131400   -9.9700 -136.3200      40.4        57       147        60
OIR    2025130    131400   -9.9700 -136.3300      40.3        57       145        60
OIR    2025130    131400   -9.9700 -136.3400      40.2        56       143        60
OIR    2025130    131400   -9.9700 -136.3500      40.1        56       142        60
OIR    2025130    131400   -9.9700 -136.3600      39.9        56       142        60
OIR    2025130    131400   -9.9700 -136.3700      39.7        56       142        60
OIR    2025130    131400   -9.9700 -136.3800      39.4        56       143        60
OIR    2025130    131400   -9.9700 -136.3900      39.3        55       143        60
OIR    2025130    131400   -9.9700 -136.4000      39.1        54       140        60
OIR    2025130    131400   -9.9700 -136.4100      39.0        54       138        60
OIR    2025130    131400   -9.9700 -136.4200      38.9        54       136        60
OIR    2025130    131400   -9.9700 -136.4300      38.7        53       135        60
OIR    2025130    131400   -9.9700 -136.4400      38.6        53       136        60
OIR    2025130    131400   -9.9700 -136.4500      38.5        53       135        60
OIR    2025130    131400   -9.9700 -136.4600      38.4        53       135        60
OIR    2025130    131400   -9.9700 -136.4700      38.2        53       136        60
OIR    2025130    131400   -9.9700 -136.4800      38.0        53       136        60
OIR    2025130    131400   -9.9700 -136.4900      37.9        53       135        60
OIR    2025130    131400   -9.9700 -136.5000      37.8        53       136        60
OIR    2025130    131400   -9.9700 -136.5100      37.8        52       139        60
OIR    2025130    131400   -9.9700 -136.5200      37.8        52       139        60
OIR    2025130    131400   -9.9700 -136.5300      38.0        52       137        60
OIR    2025130    131400   -9.9700 -136.5400      38.1        52       137        60
OIR    2025130    131400   -9.9700 -136.5500      38.1        53       136        60
OIR    2025130    131400   -9.9700 -136.5600      37.9        54       135        60
OIR    2025130    131400   -9.9700 -136.5700      37.5        56       133        60
OIR    2025130    131400   -9.9700 -136.5800      37.5        57       133        60
OIR    2025130    131400   -9.9700 -136.5900      37.5        57       132        60
OIR    2025130    131400   -9.9700 -136.6000      37.6        58       131        60
OIR    2025130    131400   -9.9700 -136.6100      37.6        58       130        60
OIR    2025130    131400   -9.9700 -136.6200      37.6        59       130        60
OIR    2025130    131400   -9.9700 -136.6300      37.5        59       132        60
OIR    2025130    131400   -9.9700 -136.6400      37.5        59       136        60
OIR    2025130    131400   -9.9700 -136.6500      37.5        59       135        60
OIR    2025130    131400   -9.9700 -136.6600      36.6        58       134        60
OIR    2025130    131400   -9.9700 -136.6700      35.1        56       130        60
OIR    2025130    131400   -9.9700 -136.6800      34.1        53       126        60
OIR    2025130    131400   -9.9700 -136.6900      33.2        51       126        60
OIR    2025130    131400   -9.9700 -136.7000      33.1        50       126        60
OIR    2025130    131400   -9.9700 -136.7100      33.0        50       124        60
OIR    2025130    131400   -9.9700 -136.7200      33.0        50       122        60
OIR    2025130    131400   -9.9700 -136.7300      33.0        50       116        60
OIR    2025130    131400   -9.9700 -136.7400      33.1        50       116        60
OIR    2025130    131400   -9.9700 -136.7500      33.1        50       116        60
OIR    2025130    131400   -9.9700 -136.7600      33.1        50       116        60
OIR    2025130    131400   -9.9700 -136.7700      33.1        50       119        60
OIR    2025130    131400   -9.9700 -136.7800      33.1        50       121        60
OIR    2025130    131400   -9.9700 -136.7900      33.1        50       123        60
OIR    2025130    131400   -9.9700 -136.8000      33.1        50       125        60
OIR    2025130    131400   -9.9700 -136.8100      33.0        50       128        60
OIR    2025130    131400   -9.9700 -136.8200      33.0        50       124        60
OIR    2025130    131400   -9.9700 -136.8300      32.9        50       121        60
OIR    2025130    131400   -9.9700 -136.8400      32.9        50       119        60
OIR    2025130    131400   -9.9700 -136.8500      32.9        50       122        60
OIR    2025130    131400   -9.9700 -136.8600      32.9        50       126        60
OIR    2025130    131400   -9.9700 -136.8700      32.7        50       130        60
OIR    2025130    131400   -9.9700 -136.8800      32.2        49       132        60
OIR    2025130    131400   -9.9700 -136.8900      31.5        49       130        60
OIR    2025130    131400   -9.9700 -136.9000      31.2        48       126        60
OIR    2025130    131400   -9.9700 -136.9100      31.1        48       120        60
OIR    2025130    131400   -9.9700 -136.9200      30.7        46       114        60
OIR    2025130    131400   -9.9700 -136.9300      30.5        44       111        60
OIR    2025130    131400   -9.9700 -136.9400      30.2        42       109        60
OIR    2025130    131400   -9.9700 -136.9500      30.2        42       108        60
OIR    2025130    131400   -9.9700 -136.9600      30.2        42       108        60
OIR    2025130    131400   -9.9700 -136.9700      30.2        42       110        60
OIR    2025130    131400   -9.9700 -136.9800      30.2        42       111        60
OIR    2025130    131400   -9.9700 -136.9900      30.2        42       112        60
OIR    2025130    131400   -9.9700 -137.0000      30.2        42       113        60
OIR    2025130    131400   -9.9700 -137.0100      30.2        42       115        60
OIR    2025130    131400   -9.9700 -137.0200      30.2        42       115        60
OIR    2025130    131400   -9.9700 -137.0300      30.3        42       116        60
OIR    2025130    131400   -9.9700 -137.0400      30.3        42       113        60
OIR    2025130    131400   -9.9700 -137.0500      30.3        42       109        60
OIR    2025130    131400   -9.9700 -137.0600      30.3        42       108        60
OIR    2025130    131400   -9.9700 -137.0700      30.3        42       105        60
OIR    2025130    131400   -9.9700 -137.0800      30.3        42       105        60
OIR    2025130    131400   -9.9700 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9700 -137.1000      30.3        42       104        60
OIR    2025130    131400   -9.9700 -137.1100      30.3        42       105        60
OIR    2025130    131400   -9.9700 -137.1200      30.3        42       107        60
OIR    2025130    131400   -9.9700 -137.1300      30.4        42       109        60
OIR    2025130    131400   -9.9700 -137.1400      30.4        42       111        60
OIR    2025130    131400   -9.9700 -137.1500      30.4        42       109        60
OIR    2025130    131400   -9.9700 -137.1600      30.4        42       107        60
OIR    2025130    131400   -9.9700 -137.1700      30.4        43       105        60
OIR    2025130    131400   -9.9700 -137.1800      30.6        43       104        60
OIR    2025130    131400   -9.9700 -137.1900      31.5        45       104        60
OIR    2025130    131400   -9.9700 -137.2000      32.2        47       104        60
OIR    2025130    131400   -9.9700 -137.2100      32.7        48       104        60
OIR    2025130    131400   -9.9700 -137.2200      32.9        49       104        60
OIR    2025130    131400   -9.9700 -137.2300      33.0        49       107        60
OIR    2025130    131400   -9.9700 -137.2400      33.1        49       109        60
OIR    2025130    131400   -9.9700 -137.2500      33.3        49       112        60
OIR    2025130    131400   -9.9700 -137.2600      33.5        49       114        60
OIR    2025130    131400   -9.9700 -137.2700      33.8        49       114        60
OIR    2025130    131400   -9.9700 -137.2800      34.7        49       108        60
OIR    2025130    131400   -9.9700 -137.2900      35.8        48       104        60
OIR    2025130    131400   -9.9700 -137.3000      36.2        47       104        60
OIR    2025130    131400   -9.9700 -137.3100      36.6        46       104        60
OIR    2025130    131400   -9.9700 -137.3200      36.8        44       104        60
OIR    2025130    131400   -9.9700 -137.3300      36.6        42       103        60
OIR    2025130    131400   -9.9700 -137.3400      36.1        39       103        60
OIR    2025130    131400   -9.9700 -137.3500      35.2        35       103        60
OIR    2025130    131400   -9.9700 -137.3600      34.6        31       103        60
OIR    2025130    131400   -9.9700 -137.3700      34.4        29       103        60
OIR    2025130    131400   -9.9700 -137.3800      34.3        28       103        60
OIR    2025130    131400   -9.9700 -137.3900      34.2        27       103        60
OIR    2025130    131400   -9.9700 -137.4000      34.0        26       103        60
OIR    2025130    131400   -9.9700 -137.4100      33.8        26       103        60
OIR    2025130    131400   -9.9700 -137.4200      33.6        25       103        60
OIR    2025130    131400   -9.9700 -137.4300      33.5        24       103        60
OIR    2025130    131400   -9.9700 -137.4400      33.5        23       103        60
OIR    2025130    131400   -9.9700 -137.4500      33.7        21       103        60
OIR    2025130    131400   -9.9700 -137.4600      34.2        19       103        60
OIR    2025130    131400   -9.9700 -137.4700      34.9        16       103        60
OIR    2025130    131400   -9.9700 -137.4800      35.2        15       103        60
OIR    2025130    131400   -9.9700 -137.4900      35.4        14       103        60
OIR    2025130    131400   -9.9700 -137.5000      35.5        14       103        60
OIR    2025130    131400   -9.9700 -137.5100      35.6        14       103        60
OIR    2025130    131400   -9.9700 -137.5200      35.6        13       103        60
OIR    2025130    131400   -9.9700 -137.5300      35.7        13       103        60
OIR    2025130    131400   -9.9700 -137.5400      35.8        13       103        60
OIR    2025130    131400   -9.9700 -137.5500      35.8        12       103        60
OIR    2025130    131400   -9.9700 -137.5600      35.9        12       103        60
OIR    2025130    131400   -9.9700 -137.5700      35.9        12       103        60
OIR    2025130    131400   -9.9700 -137.5800      35.9        11       103        60
OIR    2025130    131400   -9.9700 -137.5900      35.8        10       103        60
OIR    2025130    131400   -9.9700 -137.6000      35.8        10       103        60
OIR    2025130    131400   -9.9700 -137.6100      35.7        10       103        60
OIR    2025130    131400   -9.9700 -137.6200      35.8         9       103        60
OIR    2025130    131400   -9.9700 -137.6300      35.8         9       103        60
OIR    2025130    131400   -9.9700 -137.6400      35.8         9       103        60
OIR    2025130    131400   -9.9700 -137.6500      35.9         8       103        60
OIR    2025130    131400   -9.9700 -137.6600      35.9         8       103        60
OIR    2025130    131400   -9.9700 -137.6700      35.9         7       104        60
OIR    2025130    131400   -9.9700 -137.6800      35.8         7       104        60
OIR    2025130    131400   -9.9700 -137.6900      35.8         6       107        60
OIR    2025130    131400   -9.9700 -137.7000      35.7         6       107        60
OIR    2025130    131400   -9.9700 -137.7100      35.6         6       107        60
OIR    2025130    131400   -9.9700 -137.7200      35.5         5       107        60
OIR    2025130    131400   -9.9700 -137.7300      35.4         5       108        60
OIR    2025130    131400   -9.9700 -137.7400      35.3         5       108        60
OIR    2025130    131400   -9.9700 -137.7500      35.2         4       108        60
OIR    2025130    131400   -9.9700 -137.7600      35.0         3       107        60
OIR    2025130    131400   -9.9700 -137.7700      34.4       359       107        60
OIR    2025130    131400   -9.9700 -137.7800      33.5       356       107        60
OIR    2025130    131400   -9.9700 -137.7900      32.9       355       107        60
OIR    2025130    131400   -9.9700 -137.8000      32.6       354       107        60
OIR    2025130    131400   -9.9700 -137.8100      32.3       354       107        60
OIR    2025130    131400   -9.9700 -137.8200      32.0       353       108        60
OIR    2025130    131400   -9.9700 -137.8300      31.8       353       108        60
OIR    2025130    131400   -9.9700 -137.8400      31.6       353       108        60
OIR    2025130    131400   -9.9700 -137.8500      31.5       352       108        60
OIR    2025130    131400   -9.9700 -137.8600      31.5       352       108        60
OIR    2025130    131400   -9.9700 -137.8700      31.5       352       107        60
OIR    2025130    131400   -9.9700 -137.8800      31.4       352       107        60
OIR    2025130    131400   -9.9700 -137.8900      31.4       352       107        60
OIR    2025130    131400   -9.9700 -137.9000      31.4       352       107        60
OIR    2025130    131400   -9.9700 -137.9100      31.4       352       104        60
OIR    2025130    131400   -9.9700 -137.9200      31.4       351       104        60
OIR    2025130    131400   -9.9700 -137.9300      31.4       351       104        60
OIR    2025130    131400   -9.9700 -137.9400      31.3       351       107        60
OIR    2025130    131400   -9.9700 -137.9500      31.1       351       108        60
OIR    2025130    131400   -9.9700 -137.9600      31.0       350       109        60
OIR    2025130    131400   -9.9700 -137.9700      30.9       350       111        60
OIR    2025130    131400   -9.9700 -137.9800      30.8       350       112        60
OIR    2025130    131400   -9.9700 -137.9900      30.6       349       113        60
OIR    2025130    131400   -9.9700 -138.0000      30.5       349       114        60
OIR    2025130    131400   -9.9700 -138.0100      30.5       349       115        60
OIR    2025130    131400   -9.9700 -138.0200      30.4       349       115        60
OIR    2025130    131400   -9.9700 -138.0300      30.4       348       117        60
OIR    2025130    131400   -9.9700 -138.0400      30.4       348       120        60
OIR    2025130    131400   -9.9700 -138.0500      30.4       348       123        60
OIR    2025130    131400   -9.9700 -138.0600      30.4       347       124        60
OIR    2025130    131400   -9.9700 -138.0700      30.5       347       124        60
OIR    2025130    131400   -9.9700 -138.0800      30.5       346       124        60
OIR    2025130    131400   -9.9700 -138.0900      30.6       345       125        60
OIR    2025130    131400   -9.9700 -138.1000      30.6       344       125        60
OIR    2025130    131400   -9.9700 -138.1100      30.6       343       125        60
OIR    2025130    131400   -9.9700 -138.1200      30.6       342       125        60
OIR    2025130    131400   -9.9700 -138.1300      30.3       342       124        60
OIR    2025130    131400   -9.9700 -138.1400      30.1       341       123        60
OIR    2025130    131400   -9.9700 -138.1500      29.8       340       123        60
OIR    2025130    131400   -9.9700 -138.1600      29.5       340       124        60
OIR    2025130    131400   -9.9700 -138.1700      29.1       339       125        60
OIR    2025130    131400   -9.9700 -138.1800      28.7       339       128        60
OIR    2025130    131400   -9.9700 -138.1900      28.1       338       130        60
OIR    2025130    131400   -9.9700 -138.2000      27.5       338       133        60
OIR    2025130    131400   -9.9700 -138.2100      27.2       337       135        60
OIR    2025130    131400   -9.9700 -138.2200      26.9       336       137        60
OIR    2025130    131400   -9.9700 -138.2300      26.7       335       136        60
OIR    2025130    131400   -9.9700 -138.2400      26.3       333       134        60
OIR    2025130    131400   -9.9700 -138.2500      26.0       331       133        60
OIR    2025130    131400   -9.9700 -138.2600      25.7       330       133        60
OIR    2025130    131400   -9.9700 -138.2700      25.5       329       133        60
OIR    2025130    131400   -9.9700 -138.2800      25.4       329       134        60
OIR    2025130    131400   -9.9700 -138.2900      25.4       329       134        60
OIR    2025130    131400   -9.9700 -138.3000      25.4       329       133        60
OIR    2025130    131400   -9.9700 -138.3100      25.4       329       132        60
OIR    2025130    131400   -9.9700 -138.3200      25.4       329       132        60
OIR    2025130    131400   -9.9700 -138.3300      25.4       329       131        60
OIR    2025130    131400   -9.9700 -138.3400      25.4       329       131        60
OIR    2025130    131400   -9.9700 -138.3500      25.4       329       131        60
OIR    2025130    131400   -9.9700 -138.3600      25.5       329       131        60
OIR    2025130    131400   -9.9700 -138.3700      25.5       329       130        60
OIR    2025130    131400   -9.9700 -138.3800      25.5       329       130        60
OIR    2025130    131400   -9.9700 -138.3900      25.5       329       131        60
OIR    2025130    131400   -9.9700 -138.4000      25.5       329       134        60
OIR    2025130    131400   -9.9700 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9700 -138.4200      25.3       331       140        60
OIR    2025130    131400   -9.9700 -138.4300      25.2       333       142        60
OIR    2025130    131400   -9.9700 -138.4400      25.2       335       143        60
OIR    2025130    131400   -9.9700 -138.4500      25.2       337       146        60
OIR    2025130    131400   -9.9800 -136.1800      40.1        58       148        60
OIR    2025130    131400   -9.9800 -136.1900      40.2        58       148        60
OIR    2025130    131400   -9.9800 -136.2700      40.8        57       146        60
OIR    2025130    131400   -9.9800 -136.2800      40.7        57       145        60
OIR    2025130    131400   -9.9800 -136.2900      40.7        57       147        60
OIR    2025130    131400   -9.9800 -136.3200      40.4        56       146        60
OIR    2025130    131400   -9.9800 -136.3300      40.3        56       143        60
OIR    2025130    131400   -9.9800 -136.3400      40.2        56       141        60
OIR    2025130    131400   -9.9800 -136.3500      40.0        56       140        60
OIR    2025130    131400   -9.9800 -136.3600      39.9        56       141        60
OIR    2025130    131400   -9.9800 -136.3700      39.7        56       141        60
OIR    2025130    131400   -9.9800 -136.3800      39.4        55       140        60
OIR    2025130    131400   -9.9800 -136.3900      39.1        54       140        60
OIR    2025130    131400   -9.9800 -136.4000      38.9        54       139        60
OIR    2025130    131400   -9.9800 -136.4100      38.9        54       138        60
OIR    2025130    131400   -9.9800 -136.4200      38.8        53       135        60
OIR    2025130    131400   -9.9800 -136.4300      38.7        53       134        60
OIR    2025130    131400   -9.9800 -136.4400      38.6        53       134        60
OIR    2025130    131400   -9.9800 -136.4500      38.5        53       135        60
OIR    2025130    131400   -9.9800 -136.4600      38.4        53       137        60
OIR    2025130    131400   -9.9800 -136.4700      38.3        53       136        60
OIR    2025130    131400   -9.9800 -136.4800      38.1        52       135        60
OIR    2025130    131400   -9.9800 -136.4900      38.0        52       135        60
OIR    2025130    131400   -9.9800 -136.5000      38.0        52       135        60
OIR    2025130    131400   -9.9800 -136.5100      37.9        52       137        60
OIR    2025130    131400   -9.9800 -136.5200      38.0        52       137        60
OIR    2025130    131400   -9.9800 -136.5300      38.1        52       136        60
OIR    2025130    131400   -9.9800 -136.5400      38.2        52       136        60
OIR    2025130    131400   -9.9800 -136.5500      38.3        52       137        60
OIR    2025130    131400   -9.9800 -136.5600      38.2        52       136        60
OIR    2025130    131400   -9.9800 -136.5700      37.9        54       134        60
OIR    2025130    131400   -9.9800 -136.5800      37.6        56       134        60
OIR    2025130    131400   -9.9800 -136.5900      37.5        57       133        60
OIR    2025130    131400   -9.9800 -136.6000      37.6        57       132        60
OIR    2025130    131400   -9.9800 -136.6100      37.6        58       131        60
OIR    2025130    131400   -9.9800 -136.6200      37.6        58       131        60
OIR    2025130    131400   -9.9800 -136.6300      37.5        59       131        60
OIR    2025130    131400   -9.9800 -136.6400      37.5        59       132        60
OIR    2025130    131400   -9.9800 -136.6500      37.2        58       130        60
OIR    2025130    131400   -9.9800 -136.6600      36.0        56       128        60
OIR    2025130    131400   -9.9800 -136.6700      35.1        54       126        60
OIR    2025130    131400   -9.9800 -136.6800      34.2        52       123        60
OIR    2025130    131400   -9.9800 -136.6900      33.4        51       123        60
OIR    2025130    131400   -9.9800 -136.7000      33.2        50       122        60
OIR    2025130    131400   -9.9800 -136.7100      33.1        50       121        60
OIR    2025130    131400   -9.9800 -136.7200      33.1        50       119        60
OIR    2025130    131400   -9.9800 -136.7300      33.1        50       116        60
OIR    2025130    131400   -9.9800 -136.7400      33.1        50       115        60
OIR    2025130    131400   -9.9800 -136.7500      33.1        50       116        60
OIR    2025130    131400   -9.9800 -136.7600      33.1        50       116        60
OIR    2025130    131400   -9.9800 -136.7700      33.1        50       119        60
OIR    2025130    131400   -9.9800 -136.7800      33.1        50       122        60
OIR    2025130    131400   -9.9800 -136.7900      33.1        50       125        60
OIR    2025130    131400   -9.9800 -136.8000      33.1        50       127        60
OIR    2025130    131400   -9.9800 -136.8100      33.1        50       127        60
OIR    2025130    131400   -9.9800 -136.8200      33.0        50       123        60
OIR    2025130    131400   -9.9800 -136.8300      32.9        50       119        60
OIR    2025130    131400   -9.9800 -136.8400      32.9        50       120        60
OIR    2025130    131400   -9.9800 -136.8500      32.9        50       122        60
OIR    2025130    131400   -9.9800 -136.8600      32.9        50       126        60
OIR    2025130    131400   -9.9800 -136.8700      32.5        49       129        60
OIR    2025130    131400   -9.9800 -136.8800      31.9        49       129        60
OIR    2025130    131400   -9.9800 -136.8900      31.7        48       125        60
OIR    2025130    131400   -9.9800 -136.9000      31.5        48       121        60
OIR    2025130    131400   -9.9800 -136.9100      31.2        48       117        60
OIR    2025130    131400   -9.9800 -136.9200      30.5        46       115        60
OIR    2025130    131400   -9.9800 -136.9300      30.3        43       111        60
OIR    2025130    131400   -9.9800 -136.9400      30.2        42       107        60
OIR    2025130    131400   -9.9800 -136.9500      30.2        42       107        60
OIR    2025130    131400   -9.9800 -136.9600      30.3        42       108        60
OIR    2025130    131400   -9.9800 -136.9700      30.3        42       111        60
OIR    2025130    131400   -9.9800 -136.9800      30.3        42       113        60
OIR    2025130    131400   -9.9800 -136.9900      30.2        42       113        60
OIR    2025130    131400   -9.9800 -137.0000      30.3        42       114        60
OIR    2025130    131400   -9.9800 -137.0100      30.3        42       114        60
OIR    2025130    131400   -9.9800 -137.0200      30.3        42       115        60
OIR    2025130    131400   -9.9800 -137.0300      30.3        42       115        60
OIR    2025130    131400   -9.9800 -137.0400      30.3        42       114        60
OIR    2025130    131400   -9.9800 -137.0500      30.3        42       111        60
OIR    2025130    131400   -9.9800 -137.0600      30.3        42       108        60
OIR    2025130    131400   -9.9800 -137.0700      30.3        42       105        60
OIR    2025130    131400   -9.9800 -137.0800      30.3        42       104        60
OIR    2025130    131400   -9.9800 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9800 -137.1000      30.3        42       104        60
OIR    2025130    131400   -9.9800 -137.1100      30.3        42       105        60
OIR    2025130    131400   -9.9800 -137.1200      30.3        42       107        60
OIR    2025130    131400   -9.9800 -137.1300      30.4        42       109        60
OIR    2025130    131400   -9.9800 -137.1400      30.4        42       111        60
OIR    2025130    131400   -9.9800 -137.1500      30.4        42       108        60
OIR    2025130    131400   -9.9800 -137.1600      30.4        42       105        60
OIR    2025130    131400   -9.9800 -137.1700      30.4        43       105        60
OIR    2025130    131400   -9.9800 -137.1800      30.8        44       104        60
OIR    2025130    131400   -9.9800 -137.1900      31.8        47       104        60
OIR    2025130    131400   -9.9800 -137.2000      32.5        48       103        60
OIR    2025130    131400   -9.9800 -137.2100      32.7        49       104        60
OIR    2025130    131400   -9.9800 -137.2200      32.9        49       105        60
OIR    2025130    131400   -9.9800 -137.2300      33.0        49       110        60
OIR    2025130    131400   -9.9800 -137.2400      33.0        49       110        60
OIR    2025130    131400   -9.9800 -137.2500      33.1        49       111        60
OIR    2025130    131400   -9.9800 -137.2600      33.3        49       110        60
OIR    2025130    131400   -9.9800 -137.2700      33.7        49       108        60
OIR    2025130    131400   -9.9800 -137.2800      34.5        48       104        60
OIR    2025130    131400   -9.9800 -137.2900      35.5        47       104        60
OIR    2025130    131400   -9.9800 -137.3000      36.2        46       104        60
OIR    2025130    131400   -9.9800 -137.3100      36.8        44       104        60
OIR    2025130    131400   -9.9800 -137.3200      37.1        41       104        60
OIR    2025130    131400   -9.9800 -137.3300      37.0        39       104        60
OIR    2025130    131400   -9.9800 -137.3400      36.6        38       104        60
OIR    2025130    131400   -9.9800 -137.3500      35.5        33       104        60
OIR    2025130    131400   -9.9800 -137.3600      35.0        30       103        60
OIR    2025130    131400   -9.9800 -137.3700      34.9        29       103        60
OIR    2025130    131400   -9.9800 -137.3800      34.8        28       103        60
OIR    2025130    131400   -9.9800 -137.3900      34.7        27       103        60
OIR    2025130    131400   -9.9800 -137.4000      34.6        26       103        60
OIR    2025130    131400   -9.9800 -137.4100      34.5        25       103        60
OIR    2025130    131400   -9.9800 -137.4200      34.5        24       103        60
OIR    2025130    131400   -9.9800 -137.4300      34.5        22       103        60
OIR    2025130    131400   -9.9800 -137.4400      34.7        21       103        60
OIR    2025130    131400   -9.9800 -137.4500      34.8        19       103        60
OIR    2025130    131400   -9.9800 -137.4600      35.1        17       103        60
OIR    2025130    131400   -9.9800 -137.4700      35.2        15       103        60
OIR    2025130    131400   -9.9800 -137.4800      35.3        14       103        60
OIR    2025130    131400   -9.9800 -137.4900      35.5        14       103        60
OIR    2025130    131400   -9.9800 -137.5000      35.5        13       103        60
OIR    2025130    131400   -9.9800 -137.5100      35.6        13       103        60
OIR    2025130    131400   -9.9800 -137.5200      35.6        13       103        60
OIR    2025130    131400   -9.9800 -137.5300      35.7        13       103        60
OIR    2025130    131400   -9.9800 -137.5400      35.8        12       103        60
OIR    2025130    131400   -9.9800 -137.5500      35.8        12       103        60
OIR    2025130    131400   -9.9800 -137.5600      35.9        12       103        60
OIR    2025130    131400   -9.9800 -137.5700      35.9        11       103        60
OIR    2025130    131400   -9.9800 -137.5800      35.9        11       103        60
OIR    2025130    131400   -9.9800 -137.5900      35.8        10       103        60
OIR    2025130    131400   -9.9800 -137.6000      35.7        10       103        60
OIR    2025130    131400   -9.9800 -137.6100      35.7         9       103        60
OIR    2025130    131400   -9.9800 -137.6200      35.7         9       103        60
OIR    2025130    131400   -9.9800 -137.6300      35.7         9       103        60
OIR    2025130    131400   -9.9800 -137.6400      35.7         8       103        60
OIR    2025130    131400   -9.9800 -137.6500      35.8         8       103        60
OIR    2025130    131400   -9.9800 -137.6600      35.8         7       104        60
OIR    2025130    131400   -9.9800 -137.6700      35.8         7       105        60
OIR    2025130    131400   -9.9800 -137.6800      35.8         6       107        60
OIR    2025130    131400   -9.9800 -137.6900      35.7         6       108        60
OIR    2025130    131400   -9.9800 -137.7000      35.6         6       108        60
OIR    2025130    131400   -9.9800 -137.7100      35.6         6       107        60
OIR    2025130    131400   -9.9800 -137.7200      35.5         5       104        60
OIR    2025130    131400   -9.9800 -137.7300      35.4         5       104        60
OIR    2025130    131400   -9.9800 -137.7400      35.4         5       104        60
OIR    2025130    131400   -9.9800 -137.7500      35.3         4       105        60
OIR    2025130    131400   -9.9800 -137.7600      35.2         2       105        60
OIR    2025130    131400   -9.9800 -137.7700      34.6       359       107        60
OIR    2025130    131400   -9.9800 -137.7800      33.6       356       108        60
OIR    2025130    131400   -9.9800 -137.7900      33.1       355       107        60
OIR    2025130    131400   -9.9800 -137.8000      32.7       354       107        60
OIR    2025130    131400   -9.9800 -137.8100      32.4       354       108        60
OIR    2025130    131400   -9.9800 -137.8200      32.2       353       108        60
OIR    2025130    131400   -9.9800 -137.8300      31.9       353       107        60
OIR    2025130    131400   -9.9800 -137.8400      31.7       353       107        60
OIR    2025130    131400   -9.9800 -137.8500      31.6       352       108        60
OIR    2025130    131400   -9.9800 -137.8600      31.5       352       108        60
OIR    2025130    131400   -9.9800 -137.8700      31.5       352       108        60
OIR    2025130    131400   -9.9800 -137.8800      31.4       352       108        60
OIR    2025130    131400   -9.9800 -137.8900      31.4       352       107        60
OIR    2025130    131400   -9.9800 -137.9000      31.4       352       105        60
OIR    2025130    131400   -9.9800 -137.9100      31.4       352       104        60
OIR    2025130    131400   -9.9800 -137.9200      31.4       351       104        60
OIR    2025130    131400   -9.9800 -137.9300      31.3       351       107        60
OIR    2025130    131400   -9.9800 -137.9400      31.2       351       110        60
OIR    2025130    131400   -9.9800 -137.9500      31.0       351       111        60
OIR    2025130    131400   -9.9800 -137.9600      30.9       350       110        60
OIR    2025130    131400   -9.9800 -137.9700      30.8       350       111        60
OIR    2025130    131400   -9.9800 -137.9800      30.6       349       112        60
OIR    2025130    131400   -9.9800 -137.9900      30.5       349       112        60
OIR    2025130    131400   -9.9800 -138.0000      30.4       349       113        60
OIR    2025130    131400   -9.9800 -138.0100      30.4       349       114        60
OIR    2025130    131400   -9.9800 -138.0200      30.3       348       115        60
OIR    2025130    131400   -9.9800 -138.0300      30.3       348       117        60
OIR    2025130    131400   -9.9800 -138.0400      30.3       348       121        60
OIR    2025130    131400   -9.9800 -138.0500      30.3       347       122        60
OIR    2025130    131400   -9.9800 -138.0600      30.2       347       122        60
OIR    2025130    131400   -9.9800 -138.0700      30.2       346       121        60
OIR    2025130    131400   -9.9800 -138.0800      30.2       345       121        60
OIR    2025130    131400   -9.9800 -138.0900      30.3       344       122        60
OIR    2025130    131400   -9.9800 -138.1000      30.3       344       122        60
OIR    2025130    131400   -9.9800 -138.1100      30.3       343       122        60
OIR    2025130    131400   -9.9800 -138.1200      30.2       342       121        60
OIR    2025130    131400   -9.9800 -138.1300      29.9       342       120        60
OIR    2025130    131400   -9.9800 -138.1400      29.6       341       121        60
OIR    2025130    131400   -9.9800 -138.1500      29.3       341       122        60
OIR    2025130    131400   -9.9800 -138.1600      29.1       340       125        60
OIR    2025130    131400   -9.9800 -138.1700      28.8       340       127        60
OIR    2025130    131400   -9.9800 -138.1800      28.6       339       129        60
OIR    2025130    131400   -9.9800 -138.1900      28.3       339       131        60
OIR    2025130    131400   -9.9800 -138.2000      27.9       339       133        60
OIR    2025130    131400   -9.9800 -138.2100      27.6       338       133        60
OIR    2025130    131400   -9.9800 -138.2200      27.3       338       132        60
OIR    2025130    131400   -9.9800 -138.2300      27.2       337       132        60
OIR    2025130    131400   -9.9800 -138.2400      27.1       336       131        60
OIR    2025130    131400   -9.9800 -138.2500      26.8       334       131        60
OIR    2025130    131400   -9.9800 -138.2600      26.3       332       132        60
OIR    2025130    131400   -9.9800 -138.2700      25.9       331       133        60
OIR    2025130    131400   -9.9800 -138.2800      25.6       330       133        60
OIR    2025130    131400   -9.9800 -138.2900      25.5       330       133        60
OIR    2025130    131400   -9.9800 -138.3000      25.4       329       132        60
OIR    2025130    131400   -9.9800 -138.3100      25.4       329       131        60
OIR    2025130    131400   -9.9800 -138.3200      25.4       329       131        60
OIR    2025130    131400   -9.9800 -138.3300      25.4       329       130        60
OIR    2025130    131400   -9.9800 -138.3400      25.5       329       131        60
OIR    2025130    131400   -9.9800 -138.3500      25.5       329       131        60
OIR    2025130    131400   -9.9800 -138.3600      25.5       329       130        60
OIR    2025130    131400   -9.9800 -138.3700      25.5       329       130        60
OIR    2025130    131400   -9.9800 -138.3800      25.5       329       130        60
OIR    2025130    131400   -9.9800 -138.3900      25.5       329       131        60
OIR    2025130    131400   -9.9800 -138.4000      25.5       329       133        60
OIR    2025130    131400   -9.9800 -138.4100      25.5       329       136        60
OIR    2025130    131400   -9.9800 -138.4200      25.3       332       140        60
OIR    2025130    131400   -9.9800 -138.4300      25.2       334       142        60
OIR    2025130    131400   -9.9800 -138.4400      25.3       335       144        60
OIR    2025130    131400   -9.9800 -138.4500      25.3       337       148        60
OIR    2025130    131400   -9.9900 -136.1600      39.8        58       148        60
OIR    2025130    131400   -9.9900 -136.1700      40.0        58       146        60
OIR    2025130    131400   -9.9900 -136.1800      40.1        58       146        60
OIR    2025130    131400   -9.9900 -136.1900      40.2        57       147        60
OIR    2025130    131400   -9.9900 -136.2400      40.6        57       149        60
OIR    2025130    131400   -9.9900 -136.2700      40.7        57       146        60
OIR    2025130    131400   -9.9900 -136.2800      40.7        57       145        60
OIR    2025130    131400   -9.9900 -136.2900      40.7        57       146        60
OIR    2025130    131400   -9.9900 -136.3000      40.7        57       147        60
OIR    2025130    131400   -9.9900 -136.3100      40.5        56       147        60
OIR    2025130    131400   -9.9900 -136.3200      40.4        56       145        60
OIR    2025130    131400   -9.9900 -136.3300      40.3        56       142        60
OIR    2025130    131400   -9.9900 -136.3400      40.2        56       140        60
OIR    2025130    131400   -9.9900 -136.3500      40.0        55       139        60
OIR    2025130    131400   -9.9900 -136.3600      39.9        55       139        60
OIR    2025130    131400   -9.9900 -136.3700      39.7        55       139        60
OIR    2025130    131400   -9.9900 -136.3800      39.4        54       138        60
OIR    2025130    131400   -9.9900 -136.3900      39.1        54       137        60
OIR    2025130    131400   -9.9900 -136.4000      38.9        53       138        60
OIR    2025130    131400   -9.9900 -136.4100      38.8        53       137        60
OIR    2025130    131400   -9.9900 -136.4200      38.8        53       135        60
OIR    2025130    131400   -9.9900 -136.4300      38.7        53       134        60
OIR    2025130    131400   -9.9900 -136.4400      38.6        53       133        60
OIR    2025130    131400   -9.9900 -136.4500      38.5        53       135        60
OIR    2025130    131400   -9.9900 -136.4600      38.4        53       139        60
OIR    2025130    131400   -9.9900 -136.4700      38.3        52       136        60
OIR    2025130    131400   -9.9900 -136.4800      38.1        52       134        60
OIR    2025130    131400   -9.9900 -136.4900      38.0        52       134        60
OIR    2025130    131400   -9.9900 -136.5000      38.0        51       134        60
OIR    2025130    131400   -9.9900 -136.5100      38.0        51       136        60
OIR    2025130    131400   -9.9900 -136.5200      38.0        51       136        60
OIR    2025130    131400   -9.9900 -136.5300      38.1        51       135        60
OIR    2025130    131400   -9.9900 -136.5400      38.2        51       135        60
OIR    2025130    131400   -9.9900 -136.5500      38.2        51       136        60
OIR    2025130    131400   -9.9900 -136.5600      38.3        51       136        60
OIR    2025130    131400   -9.9900 -136.5700      38.1        52       134        60
OIR    2025130    131400   -9.9900 -136.5800      37.8        54       134        60
OIR    2025130    131400   -9.9900 -136.5900      37.5        56       134        60
OIR    2025130    131400   -9.9900 -136.6000      37.7        57       132        60
OIR    2025130    131400   -9.9900 -136.6100      37.6        58       131        60
OIR    2025130    131400   -9.9900 -136.6200      37.5        58       130        60
OIR    2025130    131400   -9.9900 -136.6300      37.4        59       130        60
OIR    2025130    131400   -9.9900 -136.6400      37.2        58       129        60
OIR    2025130    131400   -9.9900 -136.6500      36.2        56       126        60
OIR    2025130    131400   -9.9900 -136.6600      35.4        54       124        60
OIR    2025130    131400   -9.9900 -136.6700      34.9        53       122        60
OIR    2025130    131400   -9.9900 -136.6800      34.2        51       120        60
OIR    2025130    131400   -9.9900 -136.6900      33.7        50       120        60
OIR    2025130    131400   -9.9900 -136.7000      33.4        50       119        60
OIR    2025130    131400   -9.9900 -136.7100      33.2        50       116        60
OIR    2025130    131400   -9.9900 -136.7200      33.2        50       116        60
OIR    2025130    131400   -9.9900 -136.7300      33.1        50       115        60
OIR    2025130    131400   -9.9900 -136.7400      33.1        50       114        60
OIR    2025130    131400   -9.9900 -136.7500      33.2        50       114        60
OIR    2025130    131400   -9.9900 -136.7600      33.2        50       116        60
OIR    2025130    131400   -9.9900 -136.7700      33.2        50       119        60
OIR    2025130    131400   -9.9900 -136.7800      33.1        50       122        60
OIR    2025130    131400   -9.9900 -136.7900      33.1        50       126        60
OIR    2025130    131400   -9.9900 -136.8000      33.1        50       127        60
OIR    2025130    131400   -9.9900 -136.8100      33.1        50       125        60
OIR    2025130    131400   -9.9900 -136.8200      33.0        50       121        60
OIR    2025130    131400   -9.9900 -136.8300      33.0        50       117        60
OIR    2025130    131400   -9.9900 -136.8400      32.9        50       120        60
OIR    2025130    131400   -9.9900 -136.8500      32.9        49       123        60
OIR    2025130    131400   -9.9900 -136.8600      32.8        49       126        60
OIR    2025130    131400   -9.9900 -136.8700      32.1        48       127        60
OIR    2025130    131400   -9.9900 -136.8800      31.9        48       125        60
OIR    2025130    131400   -9.9900 -136.8900      31.8        48       121        60
OIR    2025130    131400   -9.9900 -136.9000      31.7        48       116        60
OIR    2025130    131400   -9.9900 -136.9100      31.5        48       116        60
OIR    2025130    131400   -9.9900 -136.9200      30.8        45       116        60
OIR    2025130    131400   -9.9900 -136.9300      30.4        42       111        60
OIR    2025130    131400   -9.9900 -136.9400      30.4        41       107        60
OIR    2025130    131400   -9.9900 -136.9500      30.3        41       105        60
OIR    2025130    131400   -9.9900 -136.9600      30.5        41       108        60
OIR    2025130    131400   -9.9900 -136.9700      30.7        41       111        60
OIR    2025130    131400   -9.9900 -136.9800      30.6        42       113        60
OIR    2025130    131400   -9.9900 -136.9900      30.3        42       114        60
OIR    2025130    131400   -9.9900 -137.0000      30.3        42       114        60
OIR    2025130    131400   -9.9900 -137.0100      30.3        42       114        60
OIR    2025130    131400   -9.9900 -137.0200      30.3        42       115        60
OIR    2025130    131400   -9.9900 -137.0300      30.3        42       115        60
OIR    2025130    131400   -9.9900 -137.0400      30.3        42       114        60
OIR    2025130    131400   -9.9900 -137.0500      30.3        42       113        60
OIR    2025130    131400   -9.9900 -137.0600      30.3        42       108        60
OIR    2025130    131400   -9.9900 -137.0700      30.3        42       105        60
OIR    2025130    131400   -9.9900 -137.0800      30.3        42       104        60
OIR    2025130    131400   -9.9900 -137.0900      30.3        42       104        60
OIR    2025130    131400   -9.9900 -137.1000      30.3        42       104        60
OIR    2025130    131400   -9.9900 -137.1100      30.4        42       104        60
OIR    2025130    131400   -9.9900 -137.1200      30.4        42       107        60
OIR    2025130    131400   -9.9900 -137.1300      30.4        42       109        60
OIR    2025130    131400   -9.9900 -137.1400      30.4        42       111        60
OIR    2025130    131400   -9.9900 -137.1500      30.4        42       108        60
OIR    2025130    131400   -9.9900 -137.1600      30.4        43       105        60
OIR    2025130    131400   -9.9900 -137.1700      30.5        43       105        60
OIR    2025130    131400   -9.9900 -137.1800      31.3        46       104        60
OIR    2025130    131400   -9.9900 -137.1900      32.2        48       104        60
OIR    2025130    131400   -9.9900 -137.2000      32.6        48       103        60
OIR    2025130    131400   -9.9900 -137.2100      32.7        49       104        60
OIR    2025130    131400   -9.9900 -137.2200      32.9        49       108        60
OIR    2025130    131400   -9.9900 -137.2300      33.0        49       112        60
OIR    2025130    131400   -9.9900 -137.2400      33.0        49       111        60
OIR    2025130    131400   -9.9900 -137.2500      33.0        49       110        60
OIR    2025130    131400   -9.9900 -137.2600      33.1        49       107        60
OIR    2025130    131400   -9.9900 -137.2700      33.4        49       103        60
OIR    2025130    131400   -9.9900 -137.2800      34.2        48       103        60
OIR    2025130    131400   -9.9900 -137.2900      35.3        47       103        60
OIR    2025130    131400   -9.9900 -137.3000      36.2        44       103        60
OIR    2025130    131400   -9.9900 -137.3100      36.8        41       104        60
OIR    2025130    131400   -9.9900 -137.3200      37.1        39       104        60
OIR    2025130    131400   -9.9900 -137.3300      37.1        38       104        60
OIR    2025130    131400   -9.9900 -137.3400      36.9        37       104        60
OIR    2025130    131400   -9.9900 -137.3500      36.0        33       104        60
OIR    2025130    131400   -9.9900 -137.3600      35.5        30       104        60
OIR    2025130    131400   -9.9900 -137.3700      35.4        28       104        60
OIR    2025130    131400   -9.9900 -137.3800      35.3        27       103        60
OIR    2025130    131400   -9.9900 -137.3900      35.3        27       103        60
OIR    2025130    131400   -9.9900 -137.4000      35.3        26       103        60
OIR    2025130    131400   -9.9900 -137.4100      35.0        24       103        60
OIR    2025130    131400   -9.9900 -137.4200      34.8        23       103        60
OIR    2025130    131400   -9.9900 -137.4300      34.8        22       103        60
OIR    2025130    131400   -9.9900 -137.4400      34.8        20       103        60
OIR    2025130    131400   -9.9900 -137.4500      35.0        18       103        60
OIR    2025130    131400   -9.9900 -137.4600      35.2        16       103        60
OIR    2025130    131400   -9.9900 -137.4700      35.4        14       103        60
OIR    2025130    131400   -9.9900 -137.4800      35.4        14       103        60
OIR    2025130    131400   -9.9900 -137.4900      35.5        13       103        60
OIR    2025130    131400   -9.9900 -137.5000      35.5        13       103        60
OIR    2025130    131400   -9.9900 -137.5100      35.5        13       103        60
OIR    2025130    131400   -9.9900 -137.5200      35.6        13       103        60
OIR    2025130    131400   -9.9900 -137.5300      35.7        12       103        60
OIR    2025130    131400   -9.9900 -137.5400      35.7        12       103        60
OIR    2025130    131400   -9.9900 -137.5500      35.8        12       103        60
OIR    2025130    131400   -9.9900 -137.5600      35.8        11       103        60
OIR    2025130    131400   -9.9900 -137.5700      35.8        11       103        60
OIR    2025130    131400   -9.9900 -137.5800      35.8        10       103        60
OIR    2025130    131400   -9.9900 -137.5900      35.7        10       103        60
OIR    2025130    131400   -9.9900 -137.6000      35.7         9       103        60
OIR    2025130    131400   -9.9900 -137.6100      35.6         9       103        60
OIR    2025130    131400   -9.9900 -137.6200      35.6         9       103        60
OIR    2025130    131400   -9.9900 -137.6300      35.6         9       103        60
OIR    2025130    131400   -9.9900 -137.6400      35.6         8       103        60
OIR    2025130    131400   -9.9900 -137.6500      35.6         8       103        60
OIR    2025130    131400   -9.9900 -137.6600      35.6         7       104        60
OIR    2025130    131400   -9.9900 -137.6700      35.6         7       105        60
OIR    2025130    131400   -9.9900 -137.6800      35.6         6       105        60
OIR    2025130    131400   -9.9900 -137.6900      35.6         6       107        60
OIR    2025130    131400   -9.9900 -137.7000      35.5         6       107        60
OIR    2025130    131400   -9.9900 -137.7100      35.5         5       105        60
OIR    2025130    131400   -9.9900 -137.7200      35.4         5       104        60
OIR    2025130    131400   -9.9900 -137.7300      35.4         5       103        60
OIR    2025130    131400   -9.9900 -137.7400      35.4         5       104        60
OIR    2025130    131400   -9.9900 -137.7500      35.4         4       104        60
OIR    2025130    131400   -9.9900 -137.7600      35.2         2       105        60
OIR    2025130    131400   -9.9900 -137.7700      34.4       359       107        60
OIR    2025130    131400   -9.9900 -137.7800      33.5       356       108        60
OIR    2025130    131400   -9.9900 -137.7900      33.1       355       108        60
OIR    2025130    131400   -9.9900 -137.8000      32.7       354       108        60
OIR    2025130    131400   -9.9900 -137.8100      32.5       354       109        60
OIR    2025130    131400   -9.9900 -137.8200      32.3       353       109        60
OIR    2025130    131400   -9.9900 -137.8300      32.0       353       108        60
OIR    2025130    131400   -9.9900 -137.8400      31.8       353       108        60
OIR    2025130    131400   -9.9900 -137.8500      31.6       352       108        60
OIR    2025130    131400   -9.9900 -137.8600      31.5       352       108        60
OIR    2025130    131400   -9.9900 -137.8700      31.5       352       109        60
OIR    2025130    131400   -9.9900 -137.8800      31.4       352       108        60
OIR    2025130    131400   -9.9900 -137.8900      31.4       352       107        60
OIR    2025130    131400   -9.9900 -137.9000      31.4       352       105        60
OIR    2025130    131400   -9.9900 -137.9100      31.4       352       104        60
OIR    2025130    131400   -9.9900 -137.9200      31.3       351       104        60
OIR    2025130    131400   -9.9900 -137.9300      31.3       351       107        60
OIR    2025130    131400   -9.9900 -137.9400      31.2       351       110        60
OIR    2025130    131400   -9.9900 -137.9500      31.0       351       111        60
OIR    2025130    131400   -9.9900 -137.9600      30.8       350       110        60
OIR    2025130    131400   -9.9900 -137.9700      30.6       350       110        60
OIR    2025130    131400   -9.9900 -137.9800      30.5       349       112        60
OIR    2025130    131400   -9.9900 -137.9900      30.4       349       111        60
OIR    2025130    131400   -9.9900 -138.0000      30.4       349       111        60
OIR    2025130    131400   -9.9900 -138.0100      30.3       349       113        60
OIR    2025130    131400   -9.9900 -138.0200      30.2       348       115        60
OIR    2025130    131400   -9.9900 -138.0300      30.2       348       117        60
OIR    2025130    131400   -9.9900 -138.0400      30.1       348       120        60
OIR    2025130    131400   -9.9900 -138.0500      30.1       347       121        60
OIR    2025130    131400   -9.9900 -138.0600      30.0       346       120        60
OIR    2025130    131400   -9.9900 -138.0700      30.0       346       119        60
OIR    2025130    131400   -9.9900 -138.0800      29.9       345       119        60
OIR    2025130    131400   -9.9900 -138.0900      30.0       344       119        60
OIR    2025130    131400   -9.9900 -138.1000      30.0       344       119        60
OIR    2025130    131400   -9.9900 -138.1100      29.9       343       119        60
OIR    2025130    131400   -9.9900 -138.1200      29.7       342       117        60
OIR    2025130    131400   -9.9900 -138.1300      29.4       342       116        60
OIR    2025130    131400   -9.9900 -138.1400      29.2       341       120        60
OIR    2025130    131400   -9.9900 -138.1500      29.0       341       123        60
OIR    2025130    131400   -9.9900 -138.1600      28.8       341       125        60
OIR    2025130    131400   -9.9900 -138.1700      28.6       340       128        60
OIR    2025130    131400   -9.9900 -138.1800      28.4       340       129        60
OIR    2025130    131400   -9.9900 -138.1900      28.2       340       131        60
OIR    2025130    131400   -9.9900 -138.2000      27.9       339       132        60
OIR    2025130    131400   -9.9900 -138.2100      27.7       339       131        60
OIR    2025130    131400   -9.9900 -138.2200      27.6       339       130        60
OIR    2025130    131400   -9.9900 -138.2300      27.6       339       129        60
OIR    2025130    131400   -9.9900 -138.2400      27.5       338       129        60
OIR    2025130    131400   -9.9900 -138.2500      27.4       337       130        60
OIR    2025130    131400   -9.9900 -138.2600      27.0       335       131        60
OIR    2025130    131400   -9.9900 -138.2700      26.4       333       131        60
OIR    2025130    131400   -9.9900 -138.2800      25.9       332       132        60
OIR    2025130    131400   -9.9900 -138.2900      25.6       331       131        60
OIR    2025130    131400   -9.9900 -138.3000      25.5       330       131        60
OIR    2025130    131400   -9.9900 -138.3100      25.5       330       130        60
OIR    2025130    131400   -9.9900 -138.3200      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3300      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3400      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3500      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3600      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3700      25.5       329       129        60
OIR    2025130    131400   -9.9900 -138.3800      25.5       329       130        60
OIR    2025130    131400   -9.9900 -138.3900      25.5       329       131        60
OIR    2025130    131400   -9.9900 -138.4000      25.5       329       133        60
OIR    2025130    131400   -9.9900 -138.4100      25.5       330       137        60
OIR    2025130    131400   -9.9900 -138.4200      25.4       332       141        60
OIR    2025130    131400   -9.9900 -138.4300      25.4       334       143        60
OIR    2025130    131400   -9.9900 -138.4400      25.4       335       145        60
OIR    2025130    131400   -9.9900 -138.4500      25.5       336       149        60
OIR    2025130    131400  -10.0000 -136.1500      39.7        57       150        60
OIR    2025130    131400  -10.0000 -136.1600      39.8        57       148        60
OIR    2025130    131400  -10.0000 -136.1700      40.0        57       147        60
OIR    2025130    131400  -10.0000 -136.1800      40.1        57       146        60
OIR    2025130    131400  -10.0000 -136.1900      40.1        57       146        60
OIR    2025130    131400  -10.0000 -136.2000      40.2        57       148        60
OIR    2025130    131400  -10.0000 -136.2400      40.4        56       149        60
OIR    2025130    131400  -10.0000 -136.2500      40.5        56       147        60
OIR    2025130    131400  -10.0000 -136.2600      40.6        56       146        60
OIR    2025130    131400  -10.0000 -136.2700      40.7        56       147        60
OIR    2025130    131400  -10.0000 -136.2800      40.7        56       147        60
OIR    2025130    131400  -10.0000 -136.2900      40.7        56       146        60
OIR    2025130    131400  -10.0000 -136.3000      40.6        56       146        60
OIR    2025130    131400  -10.0000 -136.3100      40.4        56       146        60
OIR    2025130    131400  -10.0000 -136.3200      40.4        55       144        60
OIR    2025130    131400  -10.0000 -136.3300      40.3        55       141        60
OIR    2025130    131400  -10.0000 -136.3400      40.1        55       139        60
OIR    2025130    131400  -10.0000 -136.3500      40.0        55       139        60
OIR    2025130    131400  -10.0000 -136.3600      39.9        55       138        60
OIR    2025130    131400  -10.0000 -136.3700      39.6        54       137        60
OIR    2025130    131400  -10.0000 -136.3800      39.4        54       137        60
OIR    2025130    131400  -10.0000 -136.3900      39.1        54       136        60
OIR    2025130    131400  -10.0000 -136.4000      38.9        53       136        60
OIR    2025130    131400  -10.0000 -136.4100      38.8        53       136        60
OIR    2025130    131400  -10.0000 -136.4200      38.8        53       136        60
OIR    2025130    131400  -10.0000 -136.4300      38.7        53       135        60
OIR    2025130    131400  -10.0000 -136.4400      38.6        53       133        60
OIR    2025130    131400  -10.0000 -136.4500      38.5        52       135        60
OIR    2025130    131400  -10.0000 -136.4600      38.4        52       138        60
OIR    2025130    131400  -10.0000 -136.4700      38.3        52       136        60
OIR    2025130    131400  -10.0000 -136.4800      38.1        51       134        60
OIR    2025130    131400  -10.0000 -136.4900      38.0        51       133        60
OIR    2025130    131400  -10.0000 -136.5000      38.0        51       133        60
OIR    2025130    131400  -10.0000 -136.5100      38.0        50       135        60
OIR    2025130    131400  -10.0000 -136.5200      38.1        50       135        60
OIR    2025130    131400  -10.0000 -136.5300      38.2        50       134        60
OIR    2025130    131400  -10.0000 -136.5400      38.2        50       135        60
OIR    2025130    131400  -10.0000 -136.5500      38.2        50       135        60
OIR    2025130    131400  -10.0000 -136.5600      38.2        50       134        60
OIR    2025130    131400  -10.0000 -136.5700      38.2        50       134        60
OIR    2025130    131400  -10.0000 -136.5800      38.2        50       133        60
OIR    2025130    131400  -10.0000 -136.5900      38.2        51       132        60
OIR    2025130    131400  -10.0000 -136.6000      38.0        52       131        60
OIR    2025130    131400  -10.0000 -136.6100      37.4        53       130        60
OIR    2025130    131400  -10.0000 -136.6200      36.7        55       128        60
OIR    2025130    131400  -10.0000 -136.6300      36.5        56       126        60
OIR    2025130    131400  -10.0000 -136.6400      36.2        56       125        60
OIR    2025130    131400  -10.0000 -136.6500      35.5        54       123        60
OIR    2025130    131400  -10.0000 -136.6600      35.2        53       120        60
OIR    2025130    131400  -10.0000 -136.6700      34.8        51       117        60
OIR    2025130    131400  -10.0000 -136.6800      34.4        50       116        60
OIR    2025130    131400  -10.0000 -136.6900      34.1        50       116        60
OIR    2025130    131400  -10.0000 -136.7000      33.7        50       116        60
OIR    2025130    131400  -10.0000 -136.7100      33.4        50       115        60
OIR    2025130    131400  -10.0000 -136.7200      33.3        50       114        60
OIR    2025130    131400  -10.0000 -136.7300      33.2        50       113        60
OIR    2025130    131400  -10.0000 -136.7400      33.2        50       112        60
OIR    2025130    131400  -10.0000 -136.7500      33.2        50       111        60
OIR    2025130    131400  -10.0000 -136.7600      33.2        50       113        60
OIR    2025130    131400  -10.0000 -136.7700      33.2        50       115        60
OIR    2025130    131400  -10.0000 -136.7800      33.2        50       120        60
OIR    2025130    131400  -10.0000 -136.7900      33.2        50       125        60
OIR    2025130    131400  -10.0000 -136.8000      33.1        50       124        60
OIR    2025130    131400  -10.0000 -136.8100      33.1        50       122        60
OIR    2025130    131400  -10.0000 -136.8200      33.1        50       119        60
OIR    2025130    131400  -10.0000 -136.8300      33.0        49       116        60
OIR    2025130    131400  -10.0000 -136.8400      33.0        49       117        60
OIR    2025130    131400  -10.0000 -136.8500      32.9        49       122        60
OIR    2025130    131400  -10.0000 -136.8600      32.8        49       127        60
OIR    2025130    131400  -10.0000 -136.8700      32.1        48       124        60
OIR    2025130    131400  -10.0000 -136.8800      32.0        48       119        60
OIR    2025130    131400  -10.0000 -136.8900      31.9        48       116        60
OIR    2025130    131400  -10.0000 -136.9000      31.8        48       115        60
OIR    2025130    131400  -10.0000 -136.9100      31.7        47       116        60
OIR    2025130    131400  -10.0000 -136.9200      31.2        44       116        60
OIR    2025130    131400  -10.0000 -136.9300      30.6        40       112        60
OIR    2025130    131400  -10.0000 -136.9400      30.8        39       107        60
OIR    2025130    131400  -10.0000 -136.9500      30.9        38       107        60
OIR    2025130    131400  -10.0000 -136.9600      31.3        38       108        60
OIR    2025130    131400  -10.0000 -136.9700      32.0        38       110        60
OIR    2025130    131400  -10.0000 -136.9800      32.7        38       112        60
OIR    2025130    131400  -10.0000 -136.9900      33.1        38       114        60
OIR    2025130    131400  -10.0000 -137.0000      33.0        39       114        60
OIR    2025130    131400  -10.0000 -137.0100      32.5        40       113        60
OIR    2025130    131400  -10.0000 -137.0200      31.0        41       115        60
OIR    2025130    131400  -10.0000 -137.0300      30.3        42       116        60
OIR    2025130    131400  -10.0000 -137.0400      30.3        42       115        60
OIR    2025130    131400  -10.0000 -137.0500      30.3        42       112        60
OIR    2025130    131400  -10.0000 -137.0600      30.3        42       109        60
OIR    2025130    131400  -10.0000 -137.0700      30.3        42       107        60
OIR    2025130    131400  -10.0000 -137.0800      30.4        42       104        60
OIR    2025130    131400  -10.0000 -137.0900      30.4        42       104        60
OIR    2025130    131400  -10.0000 -137.1000      30.4        42       104        60
OIR    2025130    131400  -10.0000 -137.1100      30.4        42       104        60
OIR    2025130    131400  -10.0000 -137.1200      30.4        42       105        60
OIR    2025130    131400  -10.0000 -137.1300      30.4        42       108        60
OIR    2025130    131400  -10.0000 -137.1400      30.4        42       109        60
OIR    2025130    131400  -10.0000 -137.1500      30.4        42       109        60
OIR    2025130    131400  -10.0000 -137.1600      30.4        43       108        60
OIR    2025130    131400  -10.0000 -137.1700      30.6        43       105        60
OIR    2025130    131400  -10.0000 -137.1800      31.7        47       104        60
OIR    2025130    131400  -10.0000 -137.1900      32.4        48       104        60
OIR    2025130    131400  -10.0000 -137.2000      32.5        48       104        60
OIR    2025130    131400  -10.0000 -137.2100      32.7        49       103        60
OIR    2025130    131400  -10.0000 -137.2200      32.9        49       108        60
OIR    2025130    131400  -10.0000 -137.2300      32.9        49       114        60
OIR    2025130    131400  -10.0000 -137.2400      33.0        49       112        60
OIR    2025130    131400  -10.0000 -137.2500      33.0        49       110        60
OIR    2025130    131400  -10.0000 -137.2600      33.1        49       105        60
OIR    2025130    131400  -10.0000 -137.2700      33.4        48       103        60
OIR    2025130    131400  -10.0000 -137.2800      34.3        46       103        60
OIR    2025130    131400  -10.0000 -137.2900      35.7        43       103        60
OIR    2025130    131400  -10.0000 -137.3000      36.6        40       103        60
OIR    2025130    131400  -10.0000 -137.3100      36.9        38       103        60
OIR    2025130    131400  -10.0000 -137.3200      37.0        37       104        60
OIR    2025130    131400  -10.0000 -137.3300      37.0        37       104        60
OIR    2025130    131400  -10.0000 -137.3400      36.9        36       104        60
OIR    2025130    131400  -10.0000 -137.3500      36.1        32       104        60
OIR    2025130    131400  -10.0000 -137.3600      35.8        29       104        60
OIR    2025130    131400  -10.0000 -137.3700      35.7        28       104        60
OIR    2025130    131400  -10.0000 -137.3800      35.7        27       104        60
OIR    2025130    131400  -10.0000 -137.3900      35.7        26       103        60
OIR    2025130    131400  -10.0000 -137.4000      35.7        25       103        60
OIR    2025130    131400  -10.0000 -137.4100      35.6        24       103        60
OIR    2025130    131400  -10.0000 -137.4200      35.4        23       103        60
OIR    2025130    131400  -10.0000 -137.4300      35.3        20       103        60
OIR    2025130    131400  -10.0000 -137.4400      35.4        18       103        60
OIR    2025130    131400  -10.0000 -137.4500      35.5        16       103        60
OIR    2025130    131400  -10.0000 -137.4600      35.5        15       103        60
OIR    2025130    131400  -10.0000 -137.4700      35.5        14       103        60
OIR    2025130    131400  -10.0000 -137.4800      35.5        13       103        60
OIR    2025130    131400  -10.0000 -137.4900      35.5        13       103        60
OIR    2025130    131400  -10.0000 -137.5000      35.5        13       103        60
OIR    2025130    131400  -10.0000 -137.5100      35.6        12       103        60
OIR    2025130    131400  -10.0000 -137.5200      35.6        12       103        60
OIR    2025130    131400  -10.0000 -137.5300      35.7        12       103        60
OIR    2025130    131400  -10.0000 -137.5400      35.7        11       103        60
OIR    2025130    131400  -10.0000 -137.5500      35.8        11       103        60
OIR    2025130    131400  -10.0000 -137.5600      35.8        11       103        60
OIR    2025130    131400  -10.0000 -137.5700      35.8        10       103        60
OIR    2025130    131400  -10.0000 -137.5800      35.7        10       103        60
OIR    2025130    131400  -10.0000 -137.5900      35.7        10       103        60
OIR    2025130    131400  -10.0000 -137.6000      35.6         9       103        60
OIR    2025130    131400  -10.0000 -137.6100      35.6         9       103        60
OIR    2025130    131400  -10.0000 -137.6200      35.5         9       103        60
OIR    2025130    131400  -10.0000 -137.6300      35.5         8       103        60
OIR    2025130    131400  -10.0000 -137.6400      35.5         8       103        60
OIR    2025130    131400  -10.0000 -137.6500      35.5         8       103        60
OIR    2025130    131400  -10.0000 -137.6600      35.5         7       103        60
OIR    2025130    131400  -10.0000 -137.6700      35.5         7       104        60
OIR    2025130    131400  -10.0000 -137.6800      35.5         6       104        60
OIR    2025130    131400  -10.0000 -137.6900      35.5         6       105        60
OIR    2025130    131400  -10.0000 -137.7000      35.4         6       104        60
OIR    2025130    131400  -10.0000 -137.7100      35.4         5       104        60
OIR    2025130    131400  -10.0000 -137.7200      35.4         5       103        60
OIR    2025130    131400  -10.0000 -137.7300      35.3         5       103        60
OIR    2025130    131400  -10.0000 -137.7400      35.3         4       103        60
OIR    2025130    131400  -10.0000 -137.7500      35.2         3       104        60
OIR    2025130    131400  -10.0000 -137.7600      35.0         2       105        60
OIR    2025130    131400  -10.0000 -137.7700      34.2       358       108        60
OIR    2025130    131400  -10.0000 -137.7800      33.4       356       109        60
OIR    2025130    131400  -10.0000 -137.7900      33.1       355       109        60
OIR    2025130    131400  -10.0000 -137.8000      32.8       354       109        60
OIR    2025130    131400  -10.0000 -137.8100      32.6       354       110        60
OIR    2025130    131400  -10.0000 -137.8200      32.3       353       111        60
OIR    2025130    131400  -10.0000 -137.8300      32.1       353       111        60
OIR    2025130    131400  -10.0000 -137.8400      31.8       353       111        60
OIR    2025130    131400  -10.0000 -137.8500      31.7       352       110        60
OIR    2025130    131400  -10.0000 -137.8600      31.5       352       109        60
OIR    2025130    131400  -10.0000 -137.8700      31.5       352       110        60
OIR    2025130    131400  -10.0000 -137.8800      31.4       352       108        60
OIR    2025130    131400  -10.0000 -137.8900      31.4       352       107        60
OIR    2025130    131400  -10.0000 -137.9000      31.4       352       105        60
OIR    2025130    131400  -10.0000 -137.9100      31.3       352       104        60
OIR    2025130    131400  -10.0000 -137.9200      31.3       351       104        60
OIR    2025130    131400  -10.0000 -137.9300      31.2       351       105        60
OIR    2025130    131400  -10.0000 -137.9400      31.1       351       108        60
OIR    2025130    131400  -10.0000 -137.9500      30.9       350       109        60
OIR    2025130    131400  -10.0000 -137.9600      30.7       350       109        60
OIR    2025130    131400  -10.0000 -137.9700      30.6       349       110        60
OIR    2025130    131400  -10.0000 -137.9800      30.5       349       111        60
OIR    2025130    131400  -10.0000 -137.9900      30.4       349       110        60
OIR    2025130    131400  -10.0000 -138.0000      30.3       349       110        60
OIR    2025130    131400  -10.0000 -138.0100      30.2       348       112        60
OIR    2025130    131400  -10.0000 -138.0200      30.2       348       115        60
OIR    2025130    131400  -10.0000 -138.0300      30.1       348       116        60
OIR    2025130    131400  -10.0000 -138.0400      30.0       348       119        60
OIR    2025130    131400  -10.0000 -138.0500      30.0       347       119        60
OIR    2025130    131400  -10.0000 -138.0600      29.9       346       119        60
OIR    2025130    131400  -10.0000 -138.0700      29.8       345       117        60
OIR    2025130    131400  -10.0000 -138.0800      29.7       345       116        60
OIR    2025130    131400  -10.0000 -138.0900      29.7       344       117        60
OIR    2025130    131400  -10.0000 -138.1000      29.5       343       116        60
OIR    2025130    131400  -10.0000 -138.1100      29.4       343       116        60
OIR    2025130    131400  -10.0000 -138.1200      29.2       342       116        60
OIR    2025130    131400  -10.0000 -138.1300      29.1       342       115        60
OIR    2025130    131400  -10.0000 -138.1400      28.9       341       120        60
OIR    2025130    131400  -10.0000 -138.1500      28.7       341       124        60
OIR    2025130    131400  -10.0000 -138.1600      28.6       341       126        60
OIR    2025130    131400  -10.0000 -138.1700      28.5       341       128        60
OIR    2025130    131400  -10.0000 -138.1800      28.3       340       129        60
OIR    2025130    131400  -10.0000 -138.1900      28.2       340       130        60
OIR    2025130    131400  -10.0000 -138.2000      28.0       340       131        60
OIR    2025130    131400  -10.0000 -138.2100      27.9       340       130        60
OIR    2025130    131400  -10.0000 -138.2200      27.8       340       129        60
OIR    2025130    131400  -10.0000 -138.2300      27.8       339       129        60
OIR    2025130    131400  -10.0000 -138.2400      27.7       339       129        60
OIR    2025130    131400  -10.0000 -138.2500      27.7       339       129        60
OIR    2025130    131400  -10.0000 -138.2600      27.5       338       130        60
OIR    2025130    131400  -10.0000 -138.2700      27.1       337       129        60
OIR    2025130    131400  -10.0000 -138.2800      27.0       336       129        60
OIR    2025130    131400  -10.0000 -138.2900      26.3       334       129        60
OIR    2025130    131400  -10.0000 -138.3000      25.9       332       128        60
OIR    2025130    131400  -10.0000 -138.3100      25.7       331       128        60
OIR    2025130    131400  -10.0000 -138.3200      25.6       330       129        60
OIR    2025130    131400  -10.0000 -138.3300      25.6       330       130        60
OIR    2025130    131400  -10.0000 -138.3400      25.6       329       130        60
OIR    2025130    131400  -10.0000 -138.3500      25.6       329       129        60
OIR    2025130    131400  -10.0000 -138.3600      25.6       329       129        60
OIR    2025130    131400  -10.0000 -138.3700      25.5       329       129        60
OIR    2025130    131400  -10.0000 -138.3800      25.5       329       129        60
OIR    2025130    131400  -10.0000 -138.3900      25.5       329       131        60
OIR    2025130    131400  -10.0000 -138.4000      25.5       330       134        60
OIR    2025130    131400  -10.0000 -138.4100      25.5       331       137        60
OIR    2025130    131400  -10.0000 -138.4200      25.5       333       140        60
OIR    2025130    131400  -10.0000 -138.4300      25.6       334       144        60
OIR    2025130    131400  -10.0000 -138.4400      25.7       335       147        60
OIR    2025130    131400  -10.0000 -138.4500      25.8       336       148        60
OIR    2025130    131400  -10.0000 -138.4600      25.8       337       149        60
OIR    2025130    131400  -10.0100 -136.1500      39.7        57       149        60
OIR    2025130    131400  -10.0100 -136.1600      39.8        57       148        60
OIR    2025130    131400  -10.0100 -136.1700      40.0        57       147        60
OIR    2025130    131400  -10.0100 -136.1800      40.0        57       146        60
OIR    2025130    131400  -10.0100 -136.1900      40.1        57       146        60
OIR    2025130    131400  -10.0100 -136.2000      40.2        57       147        60
OIR    2025130    131400  -10.0100 -136.2100      40.3        57       149        60
OIR    2025130    131400  -10.0100 -136.2400      40.4        55       149        60
OIR    2025130    131400  -10.0100 -136.2500      40.4        55       146        60
OIR    2025130    131400  -10.0100 -136.2600      40.5        55       145        60
OIR    2025130    131400  -10.0100 -136.2700      40.5        55       147        60
OIR    2025130    131400  -10.0100 -136.2800      40.6        55       147        60
OIR    2025130    131400  -10.0100 -136.2900      40.6        55       146        60
OIR    2025130    131400  -10.0100 -136.3000      40.5        55       145        60
OIR    2025130    131400  -10.0100 -136.3100      40.4        55       145        60
OIR    2025130    131400  -10.0100 -136.3200      40.4        55       143        60
OIR    2025130    131400  -10.0100 -136.3300      40.3        54       140        60
OIR    2025130    131400  -10.0100 -136.3400      40.1        54       139        60
OIR    2025130    131400  -10.0100 -136.3500      40.0        54       139        60
OIR    2025130    131400  -10.0100 -136.3600      39.9        54       138        60
OIR    2025130    131400  -10.0100 -136.3700      39.7        54       137        60
OIR    2025130    131400  -10.0100 -136.3800      39.4        54       137        60
OIR    2025130    131400  -10.0100 -136.3900      39.2        53       136        60
OIR    2025130    131400  -10.0100 -136.4000      39.0        53       136        60
OIR    2025130    131400  -10.0100 -136.4100      38.9        53       136        60
OIR    2025130    131400  -10.0100 -136.4200      38.8        53       137        60
OIR    2025130    131400  -10.0100 -136.4300      38.7        53       135        60
OIR    2025130    131400  -10.0100 -136.4400      38.6        52       133        60
OIR    2025130    131400  -10.0100 -136.4500      38.5        52       135        60
OIR    2025130    131400  -10.0100 -136.4600      38.4        52       138        60
OIR    2025130    131400  -10.0100 -136.4700      38.2        51       135        60
OIR    2025130    131400  -10.0100 -136.4800      38.1        50       134        60
OIR    2025130    131400  -10.0100 -136.4900      38.1        50       133        60
OIR    2025130    131400  -10.0100 -136.5000      38.1        49       133        60
OIR    2025130    131400  -10.0100 -136.5100      38.1        49       134        60
OIR    2025130    131400  -10.0100 -136.5200      38.1        49       135        60
OIR    2025130    131400  -10.0100 -136.5300      38.1        49       134        60
OIR    2025130    131400  -10.0100 -136.5400      38.2        49       134        60
OIR    2025130    131400  -10.0100 -136.5500      38.2        49       133        60
OIR    2025130    131400  -10.0100 -136.5600      38.2        49       133        60
OIR    2025130    131400  -10.0100 -136.5700      38.1        49       133        60
OIR    2025130    131400  -10.0100 -136.5800      38.1        49       132        60
OIR    2025130    131400  -10.0100 -136.5900      38.1        49       131        60
OIR    2025130    131400  -10.0100 -136.6000      37.9        50       130        60
OIR    2025130    131400  -10.0100 -136.6100      37.4        50       129        60
OIR    2025130    131400  -10.0100 -136.6200      36.7        51       126        60
OIR    2025130    131400  -10.0100 -136.6300      36.1        52       123        60
OIR    2025130    131400  -10.0100 -136.6400      35.7        52       122        60
OIR    2025130    131400  -10.0100 -136.6500      35.5        52       120        60
OIR    2025130    131400  -10.0100 -136.6600      35.2        52       117        60
OIR    2025130    131400  -10.0100 -136.6700      34.9        50       116        60
OIR    2025130    131400  -10.0100 -136.6800      34.6        50       115        60
OIR    2025130    131400  -10.0100 -136.6900      34.3        50       114        60
OIR    2025130    131400  -10.0100 -136.7000      34.0        50       114        60
OIR    2025130    131400  -10.0100 -136.7100      33.6        50       113        60
OIR    2025130    131400  -10.0100 -136.7200      33.4        50       113        60
OIR    2025130    131400  -10.0100 -136.7300      33.3        50       112        60
OIR    2025130    131400  -10.0100 -136.7400      33.2        50       111        60
OIR    2025130    131400  -10.0100 -136.7500      33.2        50       109        60
OIR    2025130    131400  -10.0100 -136.7600      33.2        50       110        60
OIR    2025130    131400  -10.0100 -136.7700      33.2        50       112        60
OIR    2025130    131400  -10.0100 -136.7800      33.2        50       117        60
OIR    2025130    131400  -10.0100 -136.7900      33.2        50       124        60
OIR    2025130    131400  -10.0100 -136.8000      33.2        50       122        60
OIR    2025130    131400  -10.0100 -136.8100      33.2        50       121        60
OIR    2025130    131400  -10.0100 -136.8200      33.1        49       120        60
OIR    2025130    131400  -10.0100 -136.8300      33.1        49       119        60
OIR    2025130    131400  -10.0100 -136.8400      33.0        49       120        60
OIR    2025130    131400  -10.0100 -136.8500      33.0        49       123        60
OIR    2025130    131400  -10.0100 -136.8600      32.9        49       127        60
OIR    2025130    131400  -10.0100 -136.8700      32.3        48       122        60
OIR    2025130    131400  -10.0100 -136.8800      32.2        48       116        60
OIR    2025130    131400  -10.0100 -136.8900      32.2        47       113        60
OIR    2025130    131400  -10.0100 -136.9000      32.0        47       113        60
OIR    2025130    131400  -10.0100 -136.9100      31.9        46       115        60
OIR    2025130    131400  -10.0100 -136.9200      31.3        42       117        60
OIR    2025130    131400  -10.0100 -136.9300      31.0        38       113        60
OIR    2025130    131400  -10.0100 -136.9400      31.3        38       109        60
OIR    2025130    131400  -10.0100 -136.9500      31.5        37       109        60
OIR    2025130    131400  -10.0100 -136.9600      32.0        37       108        60
OIR    2025130    131400  -10.0100 -136.9700      32.6        37       109        60
OIR    2025130    131400  -10.0100 -136.9800      33.2        37       110        60
OIR    2025130    131400  -10.0100 -136.9900      33.4        37       113        60
OIR    2025130    131400  -10.0100 -137.0000      33.5        38       113        60
OIR    2025130    131400  -10.0100 -137.0100      33.5        38       113        60
OIR    2025130    131400  -10.0100 -137.0200      32.8        39       115        60
OIR    2025130    131400  -10.0100 -137.0300      30.9        41       117        60
OIR    2025130    131400  -10.0100 -137.0400      30.5        42       116        60
OIR    2025130    131400  -10.0100 -137.0500      30.3        42       115        60
OIR    2025130    131400  -10.0100 -137.0600      30.3        42       111        60
OIR    2025130    131400  -10.0100 -137.0700      30.4        42       108        60
OIR    2025130    131400  -10.0100 -137.0800      30.4        42       105        60
OIR    2025130    131400  -10.0100 -137.0900      30.4        42       104        60
OIR    2025130    131400  -10.0100 -137.1000      30.4        42       104        60
OIR    2025130    131400  -10.0100 -137.1100      30.4        42       105        60
OIR    2025130    131400  -10.0100 -137.1200      30.4        42       107        60
OIR    2025130    131400  -10.0100 -137.1300      30.4        42       108        60
OIR    2025130    131400  -10.0100 -137.1400      30.4        42       110        60
OIR    2025130    131400  -10.0100 -137.1500      30.4        42       110        60
OIR    2025130    131400  -10.0100 -137.1600      30.5        43       109        60
OIR    2025130    131400  -10.0100 -137.1700      30.7        44       107        60
OIR    2025130    131400  -10.0100 -137.1800      31.9        47       105        60
OIR    2025130    131400  -10.0100 -137.1900      32.4        48       105        60
OIR    2025130    131400  -10.0100 -137.2000      32.5        48       104        60
OIR    2025130    131400  -10.0100 -137.2100      32.7        49       104        60
OIR    2025130    131400  -10.0100 -137.2200      32.9        49       109        60
OIR    2025130    131400  -10.0100 -137.2300      32.9        49       113        60
OIR    2025130    131400  -10.0100 -137.2400      33.0        49       111        60
OIR    2025130    131400  -10.0100 -137.2500      33.1        49       109        60
OIR    2025130    131400  -10.0100 -137.2600      33.2        48       105        60
OIR    2025130    131400  -10.0100 -137.2700      33.8        47       103        60
OIR    2025130    131400  -10.0100 -137.2800      35.0        43       103        60
OIR    2025130    131400  -10.0100 -137.2900      36.2        40       103        60
OIR    2025130    131400  -10.0100 -137.3000      36.8        38       103        60
OIR    2025130    131400  -10.0100 -137.3100      37.0        37       103        60
OIR    2025130    131400  -10.0100 -137.3200      37.0        37       103        60
OIR    2025130    131400  -10.0100 -137.3300      37.0        36       104        60
OIR    2025130    131400  -10.0100 -137.3400      36.9        35       104        60
OIR    2025130    131400  -10.0100 -137.3500      36.3        32       104        60
OIR    2025130    131400  -10.0100 -137.3600      36.0        29       104        60
OIR    2025130    131400  -10.0100 -137.3700      36.0        28       105        60
OIR    2025130    131400  -10.0100 -137.3800      36.0        27       105        60
OIR    2025130    131400  -10.0100 -137.3900      36.0        26       104        60
OIR    2025130    131400  -10.0100 -137.4000      36.0        25       104        60
OIR    2025130    131400  -10.0100 -137.4100      35.8        24       104        60
OIR    2025130    131400  -10.0100 -137.4200      35.6        22       103        60
OIR    2025130    131400  -10.0100 -137.4300      35.4        19       103        60
OIR    2025130    131400  -10.0100 -137.4400      35.4        17       103        60
OIR    2025130    131400  -10.0100 -137.4500      35.5        15       103        60
OIR    2025130    131400  -10.0100 -137.4600      35.5        14       103        60
OIR    2025130    131400  -10.0100 -137.4700      35.5        13       103        60
OIR    2025130    131400  -10.0100 -137.4800      35.5        13       103        60
OIR    2025130    131400  -10.0100 -137.4900      35.5        13       103        60
OIR    2025130    131400  -10.0100 -137.5000      35.5        12       103        60
OIR    2025130    131400  -10.0100 -137.5100      35.6        12       103        60
OIR    2025130    131400  -10.0100 -137.5200      35.6        12       103        60
OIR    2025130    131400  -10.0100 -137.5300      35.6        11       103        60
OIR    2025130    131400  -10.0100 -137.5400      35.7        11       103        60
OIR    2025130    131400  -10.0100 -137.5500      35.7        11       103        60
OIR    2025130    131400  -10.0100 -137.5600      35.7        10       103        60
OIR    2025130    131400  -10.0100 -137.5700      35.7        10       103        60
OIR    2025130    131400  -10.0100 -137.5800      35.6        10       103        60
OIR    2025130    131400  -10.0100 -137.5900      35.6         9       103        60
OIR    2025130    131400  -10.0100 -137.6000      35.5         9       103        60
OIR    2025130    131400  -10.0100 -137.6100      35.5         9       103        60
OIR    2025130    131400  -10.0100 -137.6200      35.5         9       103        60
OIR    2025130    131400  -10.0100 -137.6300      35.4         8       103        60
OIR    2025130    131400  -10.0100 -137.6400      35.4         8       103        60
OIR    2025130    131400  -10.0100 -137.6500      35.4         8       103        60
OIR    2025130    131400  -10.0100 -137.6600      35.4         7       103        60
OIR    2025130    131400  -10.0100 -137.6700      35.4         7       103        60
OIR    2025130    131400  -10.0100 -137.6800      35.3         6       104        60
OIR    2025130    131400  -10.0100 -137.6900      35.3         6       104        60
OIR    2025130    131400  -10.0100 -137.7000      35.3         6       104        60
OIR    2025130    131400  -10.0100 -137.7100      35.3         5       103        60
OIR    2025130    131400  -10.0100 -137.7200      35.2         5       103        60
OIR    2025130    131400  -10.0100 -137.7300      35.2         5       103        60
OIR    2025130    131400  -10.0100 -137.7400      35.2         4       104        60
OIR    2025130    131400  -10.0100 -137.7500      35.0         3       104        60
OIR    2025130    131400  -10.0100 -137.7600      34.8         1       108        60
OIR    2025130    131400  -10.0100 -137.7700      34.1       358       109        60
OIR    2025130    131400  -10.0100 -137.7800      33.4       355       111        60
OIR    2025130    131400  -10.0100 -137.7900      33.1       355       111        60
OIR    2025130    131400  -10.0100 -137.8000      32.8       354       112        60
OIR    2025130    131400  -10.0100 -137.8100      32.6       354       113        60
OIR    2025130    131400  -10.0100 -137.8200      32.4       354       114        60
OIR    2025130    131400  -10.0100 -137.8300      32.1       353       115        60
OIR    2025130    131400  -10.0100 -137.8400      31.9       353       114        60
OIR    2025130    131400  -10.0100 -137.8500      31.7       352       112        60
OIR    2025130    131400  -10.0100 -137.8600      31.6       352       111        60
OIR    2025130    131400  -10.0100 -137.8700      31.5       352       111        60
OIR    2025130    131400  -10.0100 -137.8800      31.5       352       110        60
OIR    2025130    131400  -10.0100 -137.8900      31.4       352       109        60
OIR    2025130    131400  -10.0100 -137.9000      31.4       352       108        60
OIR    2025130    131400  -10.0100 -137.9100      31.3       352       108        60
OIR    2025130    131400  -10.0100 -137.9200      31.3       351       108        60
OIR    2025130    131400  -10.0100 -137.9300      31.2       351       108        60
OIR    2025130    131400  -10.0100 -137.9400      31.0       351       109        60
OIR    2025130    131400  -10.0100 -137.9500      30.8       350       110        60
OIR    2025130    131400  -10.0100 -137.9600      30.6       350       111        60
OIR    2025130    131400  -10.0100 -137.9700      30.5       349       112        60
OIR    2025130    131400  -10.0100 -137.9800      30.4       349       113        60
OIR    2025130    131400  -10.0100 -137.9900      30.3       349       111        60
OIR    2025130    131400  -10.0100 -138.0000      30.2       348       111        60
OIR    2025130    131400  -10.0100 -138.0100      30.1       348       113        60
OIR    2025130    131400  -10.0100 -138.0200      30.1       348       116        60
OIR    2025130    131400  -10.0100 -138.0300      30.0       348       116        60
OIR    2025130    131400  -10.0100 -138.0400      29.9       347       119        60
OIR    2025130    131400  -10.0100 -138.0500      29.8       346       120        60
OIR    2025130    131400  -10.0100 -138.0600      29.7       346       120        60
OIR    2025130    131400  -10.0100 -138.0700      29.5       345       119        60
OIR    2025130    131400  -10.0100 -138.0800      29.4       344       119        60
OIR    2025130    131400  -10.0100 -138.0900      29.3       344       120        60
OIR    2025130    131400  -10.0100 -138.1000      29.2       343       120        60
OIR    2025130    131400  -10.0100 -138.1100      29.1       343       119        60
OIR    2025130    131400  -10.0100 -138.1200      29.0       342       119        60
OIR    2025130    131400  -10.0100 -138.1300      28.8       342       119        60
OIR    2025130    131400  -10.0100 -138.1400      28.7       342       122        60
OIR    2025130    131400  -10.0100 -138.1500      28.6       341       125        60
OIR    2025130    131400  -10.0100 -138.1600      28.5       341       127        60
OIR    2025130    131400  -10.0100 -138.1700      28.4       341       128        60
OIR    2025130    131400  -10.0100 -138.1800      28.3       341       129        60
OIR    2025130    131400  -10.0100 -138.1900      28.2       341       130        60
OIR    2025130    131400  -10.0100 -138.2000      28.1       340       131        60
OIR    2025130    131400  -10.0100 -138.2100      28.0       340       130        60
OIR    2025130    131400  -10.0100 -138.2200      27.9       340       129        60
OIR    2025130    131400  -10.0100 -138.2300      27.9       340       130        60
OIR    2025130    131400  -10.0100 -138.2400      27.8       340       130        60
OIR    2025130    131400  -10.0100 -138.2500      27.7       339       131        60
OIR    2025130    131400  -10.0100 -138.2600      27.6       339       131        60
OIR    2025130    131400  -10.0100 -138.2700      27.5       339       130        60
OIR    2025130    131400  -10.0100 -138.2800      27.4       338       129        60
OIR    2025130    131400  -10.0100 -138.2900      27.1       338       129        60
OIR    2025130    131400  -10.0100 -138.3000      26.6       336       129        60
OIR    2025130    131400  -10.0100 -138.3100      26.4       334       128        60
OIR    2025130    131400  -10.0100 -138.3200      26.1       332       129        60
OIR    2025130    131400  -10.0100 -138.3300      25.9       331       130        60
OIR    2025130    131400  -10.0100 -138.3400      25.9       330       129        60
OIR    2025130    131400  -10.0100 -138.3500      25.8       330       129        60
OIR    2025130    131400  -10.0100 -138.3600      25.7       329       130        60
OIR    2025130    131400  -10.0100 -138.3700      25.6       329       130        60
OIR    2025130    131400  -10.0100 -138.3800      25.5       329       130        60
OIR    2025130    131400  -10.0100 -138.3900      25.5       329       132        60
OIR    2025130    131400  -10.0100 -138.4000      25.5       330       134        60
OIR    2025130    131400  -10.0100 -138.4100      25.5       331       137        60
OIR    2025130    131400  -10.0100 -138.4200      25.6       333       141        60
OIR    2025130    131400  -10.0100 -138.4300      25.8       334       144        60
OIR    2025130    131400  -10.0100 -138.4400      25.9       336       147        60
OIR    2025130    131400  -10.0100 -138.4500      26.0       336       148        60
OIR    2025130    131400  -10.0100 -138.4600      26.0       337       149        60
OIR    2025130    131400  -10.0200 -136.1500      39.7        57       148        60
OIR    2025130    131400  -10.0200 -136.1600      39.8        57       147        60
OIR    2025130    131400  -10.0200 -136.1700      40.0        57       146        60
OIR    2025130    131400  -10.0200 -136.1800      40.1        57       146        60
OIR    2025130    131400  -10.0200 -136.1900      40.1        56       147        60
OIR    2025130    131400  -10.0200 -136.2000      40.2        56       149        60
OIR    2025130    131400  -10.0200 -136.2400      40.3        55       148        60
OIR    2025130    131400  -10.0200 -136.2500      40.4        55       145        60
OIR    2025130    131400  -10.0200 -136.2600      40.4        55       143        60
OIR    2025130    131400  -10.0200 -136.2700      40.5        55       143        60
OIR    2025130    131400  -10.0200 -136.2800      40.5        55       144        60
OIR    2025130    131400  -10.0200 -136.2900      40.5        54       145        60
OIR    2025130    131400  -10.0200 -136.3000      40.4        54       145        60
OIR    2025130    131400  -10.0200 -136.3100      40.4        54       144        60
OIR    2025130    131400  -10.0200 -136.3200      40.3        54       142        60
OIR    2025130    131400  -10.0200 -136.3300      40.2        54       141        60
OIR    2025130    131400  -10.0200 -136.3400      40.2        54       140        60
OIR    2025130    131400  -10.0200 -136.3500      40.1        54       140        60
OIR    2025130    131400  -10.0200 -136.3600      39.9        54       140        60
OIR    2025130    131400  -10.0200 -136.3700      39.8        53       140        60
OIR    2025130    131400  -10.0200 -136.3800      39.5        53       140        60
OIR    2025130    131400  -10.0200 -136.3900      39.3        53       140        60
OIR    2025130    131400  -10.0200 -136.4000      39.1        53       139        60
OIR    2025130    131400  -10.0200 -136.4100      38.9        53       138        60
OIR    2025130    131400  -10.0200 -136.4200      38.8        52       136        60
OIR    2025130    131400  -10.0200 -136.4300      38.7        52       135        60
OIR    2025130    131400  -10.0200 -136.4400      38.5        52       135        60
OIR    2025130    131400  -10.0200 -136.4500      38.4        52       135        60
OIR    2025130    131400  -10.0200 -136.4600      38.2        51       137        60
OIR    2025130    131400  -10.0200 -136.4700      38.1        50       136        60
OIR    2025130    131400  -10.0200 -136.4800      38.1        49       135        60
OIR    2025130    131400  -10.0200 -136.4900      38.1        49       134        60
OIR    2025130    131400  -10.0200 -136.5000      38.1        49       134        60
OIR    2025130    131400  -10.0200 -136.5100      38.1        49       136        60
OIR    2025130    131400  -10.0200 -136.5200      38.1        49       136        60
OIR    2025130    131400  -10.0200 -136.5300      38.1        49       134        60
OIR    2025130    131400  -10.0200 -136.5400      38.1        49       133        60
OIR    2025130    131400  -10.0200 -136.5500      38.2        49       132        60
OIR    2025130    131400  -10.0200 -136.5600      38.1        49       132        60
OIR    2025130    131400  -10.0200 -136.5700      38.1        49       132        60
OIR    2025130    131400  -10.0200 -136.5800      38.1        49       131        60
OIR    2025130    131400  -10.0200 -136.5900      38.1        49       130        60
OIR    2025130    131400  -10.0200 -136.6000      38.0        49       130        60
OIR    2025130    131400  -10.0200 -136.6100      37.7        49       129        60
OIR    2025130    131400  -10.0200 -136.6200      37.3        49       125        60
OIR    2025130    131400  -10.0200 -136.6300      36.7        50       121        60
OIR    2025130    131400  -10.0200 -136.6400      35.9        51       116        60
OIR    2025130    131400  -10.0200 -136.6500      35.6        51       116        60
OIR    2025130    131400  -10.0200 -136.6600      35.4        50       117        60
OIR    2025130    131400  -10.0200 -136.6700      35.1        50       117        60
OIR    2025130    131400  -10.0200 -136.6800      34.8        50       116        60
OIR    2025130    131400  -10.0200 -136.6900      34.5        50       113        60
OIR    2025130    131400  -10.0200 -136.7000      34.3        50       111        60
OIR    2025130    131400  -10.0200 -136.7100      33.9        50       113        60
OIR    2025130    131400  -10.0200 -136.7200      33.5        50       114        60
OIR    2025130    131400  -10.0200 -136.7300      33.3        50       114        60
OIR    2025130    131400  -10.0200 -136.7400      33.3        50       113        60
OIR    2025130    131400  -10.0200 -136.7500      33.2        50       110        60
OIR    2025130    131400  -10.0200 -136.7600      33.2        50       110        60
OIR    2025130    131400  -10.0200 -136.7700      33.2        50       111        60
OIR    2025130    131400  -10.0200 -136.7800      33.3        50       116        60
OIR    2025130    131400  -10.0200 -136.7900      33.3        50       122        60
OIR    2025130    131400  -10.0200 -136.8000      33.3        49       123        60
OIR    2025130    131400  -10.0200 -136.8100      33.3        49       124        60
OIR    2025130    131400  -10.0200 -136.8200      33.3        49       123        60
OIR    2025130    131400  -10.0200 -136.8300      33.2        49       123        60
OIR    2025130    131400  -10.0200 -136.8400      33.1        49       125        60
OIR    2025130    131400  -10.0200 -136.8500      33.1        49       126        60
OIR    2025130    131400  -10.0200 -136.8600      32.9        49       126        60
OIR    2025130    131400  -10.0200 -136.8700      32.5        48       122        60
OIR    2025130    131400  -10.0200 -136.8800      32.4        48       116        60
OIR    2025130    131400  -10.0200 -136.8900      32.4        47       112        60
OIR    2025130    131400  -10.0200 -136.9000      32.4        47       110        60
OIR    2025130    131400  -10.0200 -136.9100      32.3        44       113        60
OIR    2025130    131400  -10.0200 -136.9200      31.9        40       116        60
OIR    2025130    131400  -10.0200 -136.9300      31.6        37       115        60
OIR    2025130    131400  -10.0200 -136.9400      31.9        36       114        60
OIR    2025130    131400  -10.0200 -136.9500      32.1        36       111        60
OIR    2025130    131400  -10.0200 -136.9600      32.6        36       109        60
OIR    2025130    131400  -10.0200 -136.9700      33.2        36       108        60
OIR    2025130    131400  -10.0200 -136.9800      33.6        37       109        60
OIR    2025130    131400  -10.0200 -136.9900      33.8        37       110        60
OIR    2025130    131400  -10.0200 -137.0000      33.9        37       112        60
OIR    2025130    131400  -10.0200 -137.0100      34.0        38       113        60
OIR    2025130    131400  -10.0200 -137.0200      34.0        38       116        60
OIR    2025130    131400  -10.0200 -137.0300      33.6        39       120        60
OIR    2025130    131400  -10.0200 -137.0400      32.8        40       120        60
OIR    2025130    131400  -10.0200 -137.0500      31.3        41       119        60
OIR    2025130    131400  -10.0200 -137.0600      30.5        42       114        60
OIR    2025130    131400  -10.0200 -137.0700      30.4        42       110        60
OIR    2025130    131400  -10.0200 -137.0800      30.4        42       108        60
OIR    2025130    131400  -10.0200 -137.0900      30.4        42       105        60
OIR    2025130    131400  -10.0200 -137.1000      30.4        42       105        60
OIR    2025130    131400  -10.0200 -137.1100      30.4        42       107        60
OIR    2025130    131400  -10.0200 -137.1200      30.4        42       109        60
OIR    2025130    131400  -10.0200 -137.1300      30.4        42       110        60
OIR    2025130    131400  -10.0200 -137.1400      30.4        42       111        60
OIR    2025130    131400  -10.0200 -137.1500      30.5        43       110        60
OIR    2025130    131400  -10.0200 -137.1600      30.6        43       109        60
OIR    2025130    131400  -10.0200 -137.1700      30.9        44       109        60
OIR    2025130    131400  -10.0200 -137.1800      31.9        47       108        60
OIR    2025130    131400  -10.0200 -137.1900      32.4        48       108        60
OIR    2025130    131400  -10.0200 -137.2000      32.6        48       108        60
OIR    2025130    131400  -10.0200 -137.2100      32.7        49       109        60
OIR    2025130    131400  -10.0200 -137.2200      32.9        49       111        60
OIR    2025130    131400  -10.0200 -137.2300      32.9        49       112        60
OIR    2025130    131400  -10.0200 -137.2400      33.0        49       110        60
OIR    2025130    131400  -10.0200 -137.2500      33.2        48       108        60
OIR    2025130    131400  -10.0200 -137.2600      33.6        47       104        60
OIR    2025130    131400  -10.0200 -137.2700      34.4        44       103        60
OIR    2025130    131400  -10.0200 -137.2800      35.6        40       103        60
OIR    2025130    131400  -10.0200 -137.2900      36.5        38       103        60
OIR    2025130    131400  -10.0200 -137.3000      36.9        37       103        60
OIR    2025130    131400  -10.0200 -137.3100      37.0        37       103        60
OIR    2025130    131400  -10.0200 -137.3200      37.0        36       103        60
OIR    2025130    131400  -10.0200 -137.3300      36.9        35       104        60
OIR    2025130    131400  -10.0200 -137.3400      36.8        34       105        60
OIR    2025130    131400  -10.0200 -137.3500      36.4        31       105        60
OIR    2025130    131400  -10.0200 -137.3600      36.1        29       105        60
OIR    2025130    131400  -10.0200 -137.3700      36.1        28       108        60
OIR    2025130    131400  -10.0200 -137.3800      36.2        27       108        60
OIR    2025130    131400  -10.0200 -137.3900      36.2        26       107        60
OIR    2025130    131400  -10.0200 -137.4000      36.2        25       105        60
OIR    2025130    131400  -10.0200 -137.4100      36.0        24       104        60
OIR    2025130    131400  -10.0200 -137.4200      35.6        21       104        60
OIR    2025130    131400  -10.0200 -137.4300      35.3        18       103        60
OIR    2025130    131400  -10.0200 -137.4400      35.3        16       103        60
OIR    2025130    131400  -10.0200 -137.4500      35.4        14       103        60
OIR    2025130    131400  -10.0200 -137.4600      35.5        13       103        60
OIR    2025130    131400  -10.0200 -137.4700      35.5        13       103        60
OIR    2025130    131400  -10.0200 -137.4800      35.5        13       103        60
OIR    2025130    131400  -10.0200 -137.4900      35.6        12       103        60
OIR    2025130    131400  -10.0200 -137.5000      35.6        12       103        60
OIR    2025130    131400  -10.0200 -137.5100      35.6        12       103        60
OIR    2025130    131400  -10.0200 -137.5200      35.7        11       103        60
OIR    2025130    131400  -10.0200 -137.5300      35.7        11       103        60
OIR    2025130    131400  -10.0200 -137.5400      35.7        11       103        60
OIR    2025130    131400  -10.0200 -137.5500      35.7        10       103        60
OIR    2025130    131400  -10.0200 -137.5600      35.6        10       103        60
OIR    2025130    131400  -10.0200 -137.5700      35.6        10       103        60
OIR    2025130    131400  -10.0200 -137.5800      35.6        10       103        60
OIR    2025130    131400  -10.0200 -137.5900      35.5         9       103        60
OIR    2025130    131400  -10.0200 -137.6000      35.5         9       103        60
OIR    2025130    131400  -10.0200 -137.6100      35.4         9       103        60
OIR    2025130    131400  -10.0200 -137.6200      35.4         8       103        60
OIR    2025130    131400  -10.0200 -137.6300      35.3         8       103        60
OIR    2025130    131400  -10.0200 -137.6400      35.3         8       103        60
OIR    2025130    131400  -10.0200 -137.6500      35.3         7       103        60
OIR    2025130    131400  -10.0200 -137.6600      35.3         7       103        60
OIR    2025130    131400  -10.0200 -137.6700      35.2         7       103        60
OIR    2025130    131400  -10.0200 -137.6800      35.2         6       103        60
OIR    2025130    131400  -10.0200 -137.6900      35.2         6       104        60
OIR    2025130    131400  -10.0200 -137.7000      35.1         6       103        60
OIR    2025130    131400  -10.0200 -137.7100      35.1         5       103        60
OIR    2025130    131400  -10.0200 -137.7200      35.1         5       103        60
OIR    2025130    131400  -10.0200 -137.7300      35.1         5       104        60
OIR    2025130    131400  -10.0200 -137.7400      35.0         4       104        60
OIR    2025130    131400  -10.0200 -137.7500      34.9         3       105        60
OIR    2025130    131400  -10.0200 -137.7600      34.6         1       109        60
OIR    2025130    131400  -10.0200 -137.7700      33.9       357       111        60
OIR    2025130    131400  -10.0200 -137.7800      33.3       355       113        60
OIR    2025130    131400  -10.0200 -137.7900      33.0       355       115        60
OIR    2025130    131400  -10.0200 -137.8000      32.8       354       116        60
OIR    2025130    131400  -10.0200 -137.8100      32.6       354       116        60
OIR    2025130    131400  -10.0200 -137.8200      32.4       354       116        60
OIR    2025130    131400  -10.0200 -137.8300      32.2       353       119        60
OIR    2025130    131400  -10.0200 -137.8400      32.0       353       117        60
OIR    2025130    131400  -10.0200 -137.8500      31.8       353       114        60
OIR    2025130    131400  -10.0200 -137.8600      31.6       352       112        60
OIR    2025130    131400  -10.0200 -137.8700      31.5       352       112        60
OIR    2025130    131400  -10.0200 -137.8800      31.5       352       112        60
OIR    2025130    131400  -10.0200 -137.8900      31.4       352       112        60
OIR    2025130    131400  -10.0200 -137.9000      31.4       352       112        60
OIR    2025130    131400  -10.0200 -137.9100      31.3       352       111        60
OIR    2025130    131400  -10.0200 -137.9200      31.3       351       111        60
OIR    2025130    131400  -10.0200 -137.9300      31.2       351       111        60
OIR    2025130    131400  -10.0200 -137.9400      31.0       351       112        60
OIR    2025130    131400  -10.0200 -137.9500      30.8       350       113        60
OIR    2025130    131400  -10.0200 -137.9600      30.6       350       113        60
OIR    2025130    131400  -10.0200 -137.9700      30.4       349       114        60
OIR    2025130    131400  -10.0200 -137.9800      30.4       349       116        60
OIR    2025130    131400  -10.0200 -137.9900      30.2       349       114        60
OIR    2025130    131400  -10.0200 -138.0000      30.1       348       113        60
OIR    2025130    131400  -10.0200 -138.0100      30.0       348       115        60
OIR    2025130    131400  -10.0200 -138.0200      29.9       348       116        60
OIR    2025130    131400  -10.0200 -138.0300      29.8       347       117        60
OIR    2025130    131400  -10.0200 -138.0400      29.6       347       119        60
OIR    2025130    131400  -10.0200 -138.0500      29.4       346       121        60
OIR    2025130    131400  -10.0200 -138.0600      29.3       345       121        60
OIR    2025130    131400  -10.0200 -138.0700      29.3       344       121        60
OIR    2025130    131400  -10.0200 -138.0800      29.2       344       122        60
OIR    2025130    131400  -10.0200 -138.0900      29.1       343       124        60
OIR    2025130    131400  -10.0200 -138.1000      29.0       343       125        60
OIR    2025130    131400  -10.0200 -138.1100      28.9       342       125        60
OIR    2025130    131400  -10.0200 -138.1200      28.8       342       125        60
OIR    2025130    131400  -10.0200 -138.1300      28.7       342       126        60
OIR    2025130    131400  -10.0200 -138.1400      28.6       342       126        60
OIR    2025130    131400  -10.0200 -138.1500      28.5       341       127        60
OIR    2025130    131400  -10.0200 -138.1600      28.4       341       128        60
OIR    2025130    131400  -10.0200 -138.1700      28.3       341       129        60
OIR    2025130    131400  -10.0200 -138.1800      28.2       341       130        60
OIR    2025130    131400  -10.0200 -138.1900      28.2       341       131        60
OIR    2025130    131400  -10.0200 -138.2000      28.1       341       132        60
OIR    2025130    131400  -10.0200 -138.2100      28.0       341       130        60
OIR    2025130    131400  -10.0200 -138.2200      28.0       340       130        60
OIR    2025130    131400  -10.0200 -138.2300      27.9       340       131        60
OIR    2025130    131400  -10.0200 -138.2400      27.8       340       133        60
OIR    2025130    131400  -10.0200 -138.2500      27.7       340       134        60
OIR    2025130    131400  -10.0200 -138.2600      27.7       339       133        60
OIR    2025130    131400  -10.0200 -138.2700      27.6       339       131        60
OIR    2025130    131400  -10.0200 -138.2800      27.5       339       130        60
OIR    2025130    131400  -10.0200 -138.2900      27.4       339       130        60
OIR    2025130    131400  -10.0200 -138.3000      27.2       338       130        60
OIR    2025130    131400  -10.0200 -138.3100      27.0       337       129        60
OIR    2025130    131400  -10.0200 -138.3200      26.7       335       129        60
OIR    2025130    131400  -10.0200 -138.3300      26.3       333       130        60
OIR    2025130    131400  -10.0200 -138.3400      26.1       331       129        60
OIR    2025130    131400  -10.0200 -138.3500      26.0       330       129        60
OIR    2025130    131400  -10.0200 -138.3600      25.9       330       131        60
OIR    2025130    131400  -10.0200 -138.3700      25.7       330       132        60
OIR    2025130    131400  -10.0200 -138.3800      25.7       330       133        60
OIR    2025130    131400  -10.0200 -138.3900      25.7       331       133        60
OIR    2025130    131400  -10.0200 -138.4000      25.6       331       133        60
OIR    2025130    131400  -10.0200 -138.4100      25.6       332       136        60
OIR    2025130    131400  -10.0200 -138.4200      25.8       333       141        60
OIR    2025130    131400  -10.0200 -138.4300      26.0       335       144        60
OIR    2025130    131400  -10.0200 -138.4400      26.2       336       147        60
OIR    2025130    131400  -10.0200 -138.4500      26.2       337       148        60
OIR    2025130    131400  -10.0200 -138.4600      26.2       337       149        60
OIR    2025130    131400  -10.0300 -136.1500      39.6        56       149        60
OIR    2025130    131400  -10.0300 -136.1600      39.8        56       146        60
OIR    2025130    131400  -10.0300 -136.1700      40.0        56       146        60
OIR    2025130    131400  -10.0300 -136.1800      40.1        56       146        60
OIR    2025130    131400  -10.0300 -136.1900      40.2        56       148        60
OIR    2025130    131400  -10.0300 -136.2400      40.3        55       147        60
OIR    2025130    131400  -10.0300 -136.2500      40.4        54       145        60
OIR    2025130    131400  -10.0300 -136.2600      40.4        54       143        60
OIR    2025130    131400  -10.0300 -136.2700      40.4        54       143        60
OIR    2025130    131400  -10.0300 -136.2800      40.4        54       144        60
OIR    2025130    131400  -10.0300 -136.2900      40.4        54       145        60
OIR    2025130    131400  -10.0300 -136.3000      40.4        54       145        60
OIR    2025130    131400  -10.0300 -136.3100      40.4        53       143        60
OIR    2025130    131400  -10.0300 -136.3200      40.3        53       142        60
OIR    2025130    131400  -10.0300 -136.3300      40.2        53       141        60
OIR    2025130    131400  -10.0300 -136.3400      40.2        53       141        60
OIR    2025130    131400  -10.0300 -136.3500      40.1        53       142        60
OIR    2025130    131400  -10.0300 -136.3600      40.0        53       142        60
OIR    2025130    131400  -10.0300 -136.3700      39.8        53       142        60
OIR    2025130    131400  -10.0300 -136.3800      39.6        53       142        60
OIR    2025130    131400  -10.0300 -136.3900      39.4        53       142        60
OIR    2025130    131400  -10.0300 -136.4000      39.2        53       140        60
OIR    2025130    131400  -10.0300 -136.4100      39.0        52       138        60
OIR    2025130    131400  -10.0300 -136.4200      38.8        52       136        60
OIR    2025130    131400  -10.0300 -136.4300      38.7        52       135        60
OIR    2025130    131400  -10.0300 -136.4400      38.4        51       135        60
OIR    2025130    131400  -10.0300 -136.4500      38.3        51       136        60
OIR    2025130    131400  -10.0300 -136.4600      38.1        50       136        60
OIR    2025130    131400  -10.0300 -136.4700      38.1        49       137        60
OIR    2025130    131400  -10.0300 -136.4800      38.1        49       136        60
OIR    2025130    131400  -10.0300 -136.4900      38.1        49       135        60
OIR    2025130    131400  -10.0300 -136.5000      38.1        49       134        60
OIR    2025130    131400  -10.0300 -136.5100      38.1        49       135        60
OIR    2025130    131400  -10.0300 -136.5200      38.1        49       135        60
OIR    2025130    131400  -10.0300 -136.5300      38.1        49       135        60
OIR    2025130    131400  -10.0300 -136.5400      38.1        49       134        60
OIR    2025130    131400  -10.0300 -136.5500      38.1        48       133        60
OIR    2025130    131400  -10.0300 -136.5600      38.1        48       132        60
OIR    2025130    131400  -10.0300 -136.5700      38.1        48       131        60
OIR    2025130    131400  -10.0300 -136.5800      38.1        48       130        60
OIR    2025130    131400  -10.0300 -136.5900      38.1        48       130        60
OIR    2025130    131400  -10.0300 -136.6000      38.1        48       130        60
OIR    2025130    131400  -10.0300 -136.6100      37.9        48       129        60
OIR    2025130    131400  -10.0300 -136.6200      37.6        49       125        60
OIR    2025130    131400  -10.0300 -136.6300      37.2        49       120        60
OIR    2025130    131400  -10.0300 -136.6400      36.6        49       116        60
OIR    2025130    131400  -10.0300 -136.6500      36.0        50       116        60
OIR    2025130    131400  -10.0300 -136.6600      35.6        50       116        60
OIR    2025130    131400  -10.0300 -136.6700      35.3        50       117        60
OIR    2025130    131400  -10.0300 -136.6800      35.0        50       117        60
OIR    2025130    131400  -10.0300 -136.6900      34.7        50       113        60
OIR    2025130    131400  -10.0300 -136.7000      34.5        50       111        60
OIR    2025130    131400  -10.0300 -136.7100      34.2        50       113        60
OIR    2025130    131400  -10.0300 -136.7200      33.7        50       115        60
OIR    2025130    131400  -10.0300 -136.7300      33.5        50       116        60
OIR    2025130    131400  -10.0300 -136.7400      33.4        50       114        60
OIR    2025130    131400  -10.0300 -136.7500      33.3        50       111        60
OIR    2025130    131400  -10.0300 -136.7600      33.3        50       111        60
OIR    2025130    131400  -10.0300 -136.7700      33.3        50       112        60
OIR    2025130    131400  -10.0300 -136.7800      33.3        50       115        60
OIR    2025130    131400  -10.0300 -136.7900      33.4        49       119        60
OIR    2025130    131400  -10.0300 -136.8000      33.5        49       121        60
OIR    2025130    131400  -10.0300 -136.8100      33.5        49       123        60
OIR    2025130    131400  -10.0300 -136.8200      33.5        49       123        60
OIR    2025130    131400  -10.0300 -136.8300      33.5        49       123        60
OIR    2025130    131400  -10.0300 -136.8400      33.4        49       125        60
OIR    2025130    131400  -10.0300 -136.8500      33.3        49       125        60
OIR    2025130    131400  -10.0300 -136.8600      33.1        49       124        60
OIR    2025130    131400  -10.0300 -136.8700      32.6        48       120        60
OIR    2025130    131400  -10.0300 -136.8800      32.5        47       115        60
OIR    2025130    131400  -10.0300 -136.8900      32.5        47       112        60
OIR    2025130    131400  -10.0300 -136.9000      32.5        46       111        60
OIR    2025130    131400  -10.0300 -136.9100      32.4        43       113        60
OIR    2025130    131400  -10.0300 -136.9200      32.3        38       115        60
OIR    2025130    131400  -10.0300 -136.9300      32.3        36       116        60
OIR    2025130    131400  -10.0300 -136.9400      32.7        35       115        60
OIR    2025130    131400  -10.0300 -136.9500      33.1        35       111        60
OIR    2025130    131400  -10.0300 -136.9600      33.4        35       108        60
OIR    2025130    131400  -10.0300 -136.9700      33.7        35       107        60
OIR    2025130    131400  -10.0300 -136.9800      34.0        36       108        60
OIR    2025130    131400  -10.0300 -136.9900      34.2        37       108        60
OIR    2025130    131400  -10.0300 -137.0000      34.3        37       109        60
OIR    2025130    131400  -10.0300 -137.0100      34.2        38       111        60
OIR    2025130    131400  -10.0300 -137.0200      34.2        38       115        60
OIR    2025130    131400  -10.0300 -137.0300      34.1        38       120        60
OIR    2025130    131400  -10.0300 -137.0400      33.9        39       121        60
OIR    2025130    131400  -10.0300 -137.0500      32.9        40       121        60
OIR    2025130    131400  -10.0300 -137.0600      31.2        41       116        60
OIR    2025130    131400  -10.0300 -137.0700      30.8        42       113        60
OIR    2025130    131400  -10.0300 -137.0800      30.6        42       111        60
OIR    2025130    131400  -10.0300 -137.0900      30.5        42       109        60
OIR    2025130    131400  -10.0300 -137.1000      30.5        42       108        60
OIR    2025130    131400  -10.0300 -137.1100      30.5        42       109        60
OIR    2025130    131400  -10.0300 -137.1200      30.5        42       111        60
OIR    2025130    131400  -10.0300 -137.1300      30.5        42       111        60
OIR    2025130    131400  -10.0300 -137.1400      30.6        42       112        60
OIR    2025130    131400  -10.0300 -137.1500      30.7        43       111        60
OIR    2025130    131400  -10.0300 -137.1600      30.8        43       111        60
OIR    2025130    131400  -10.0300 -137.1700      31.0        44       111        60
OIR    2025130    131400  -10.0300 -137.1800      31.9        46       111        60
OIR    2025130    131400  -10.0300 -137.1900      32.4        48       110        60
OIR    2025130    131400  -10.0300 -137.2000      32.6        48       110        60
OIR    2025130    131400  -10.0300 -137.2100      32.7        48       111        60
OIR    2025130    131400  -10.0300 -137.2200      32.8        48       112        60
OIR    2025130    131400  -10.0300 -137.2300      33.0        48       111        60
OIR    2025130    131400  -10.0300 -137.2400      33.2        48       109        60
OIR    2025130    131400  -10.0300 -137.2500      33.6        47       108        60
OIR    2025130    131400  -10.0300 -137.2600      34.3        45       104        60
OIR    2025130    131400  -10.0300 -137.2700      35.4        41       103        60
OIR    2025130    131400  -10.0300 -137.2800      36.2        38       103        60
OIR    2025130    131400  -10.0300 -137.2900      36.7        37       103        60
OIR    2025130    131400  -10.0300 -137.3000      37.0        36       103        60
OIR    2025130    131400  -10.0300 -137.3100      37.0        36       103        60
OIR    2025130    131400  -10.0300 -137.3200      37.0        36       103        60
OIR    2025130    131400  -10.0300 -137.3300      36.8        35       104        60
OIR    2025130    131400  -10.0300 -137.3400      36.7        34       104        60
OIR    2025130    131400  -10.0300 -137.3500      36.2        31       104        60
OIR    2025130    131400  -10.0300 -137.3600      36.2        29       104        60
OIR    2025130    131400  -10.0300 -137.3700      36.2        28       108        60
OIR    2025130    131400  -10.0300 -137.3800      36.4        27       110        60
OIR    2025130    131400  -10.0300 -137.3900      36.5        26       108        60
OIR    2025130    131400  -10.0300 -137.4000      36.4        25       107        60
OIR    2025130    131400  -10.0300 -137.4100      35.9        22       104        60
OIR    2025130    131400  -10.0300 -137.4200      35.4        19       104        60
OIR    2025130    131400  -10.0300 -137.4300      35.1        16       104        60
OIR    2025130    131400  -10.0300 -137.4400      35.1        14       104        60
OIR    2025130    131400  -10.0300 -137.4500      35.2        13       104        60
OIR    2025130    131400  -10.0300 -137.4600      35.3        13       104        60
OIR    2025130    131400  -10.0300 -137.4700      35.4        12       104        60
OIR    2025130    131400  -10.0300 -137.4800      35.5        12       104        60
OIR    2025130    131400  -10.0300 -137.4900      35.6        12       104        60
OIR    2025130    131400  -10.0300 -137.5000      35.6        12       103        60
OIR    2025130    131400  -10.0300 -137.5100      35.7        11       103        60
OIR    2025130    131400  -10.0300 -137.5200      35.7        11       103        60
OIR    2025130    131400  -10.0300 -137.5300      35.7        11       103        60
OIR    2025130    131400  -10.0300 -137.5400      35.7        11       103        60
OIR    2025130    131400  -10.0300 -137.5500      35.6        10       103        60
OIR    2025130    131400  -10.0300 -137.5600      35.6        10       103        60
OIR    2025130    131400  -10.0300 -137.5700      35.6        10       103        60
OIR    2025130    131400  -10.0300 -137.5800      35.5         9       103        60
OIR    2025130    131400  -10.0300 -137.5900      35.5         9       103        60
OIR    2025130    131400  -10.0300 -137.6000      35.4         9       103        60
OIR    2025130    131400  -10.0300 -137.6100      35.4         8       103        60
OIR    2025130    131400  -10.0300 -137.6200      35.3         8       103        60
OIR    2025130    131400  -10.0300 -137.6300      35.2         8       103        60
OIR    2025130    131400  -10.0300 -137.6400      35.2         8       103        60
OIR    2025130    131400  -10.0300 -137.6500      35.1         7       103        60
OIR    2025130    131400  -10.0300 -137.6600      35.1         7       103        60
OIR    2025130    131400  -10.0300 -137.6700      35.1         6       103        60
OIR    2025130    131400  -10.0300 -137.6800      35.0         6       103        60
OIR    2025130    131400  -10.0300 -137.6900      35.0         6       103        60
OIR    2025130    131400  -10.0300 -137.7000      35.0         5       103        60
OIR    2025130    131400  -10.0300 -137.7100      35.0         5       103        60
OIR    2025130    131400  -10.0300 -137.7200      35.0         5       103        60
OIR    2025130    131400  -10.0300 -137.7300      35.0         5       104        60
OIR    2025130    131400  -10.0300 -137.7400      34.9         4       104        60
OIR    2025130    131400  -10.0300 -137.7500      34.7         3       107        60
OIR    2025130    131400  -10.0300 -137.7600      34.3         1       111        60
OIR    2025130    131400  -10.0300 -137.7700      33.6       357       113        60
OIR    2025130    131400  -10.0300 -137.7800      33.1       355       114        60
OIR    2025130    131400  -10.0300 -137.7900      32.9       354       115        60
OIR    2025130    131400  -10.0300 -137.8000      32.7       354       116        60
OIR    2025130    131400  -10.0300 -137.8100      32.5       354       116        60
OIR    2025130    131400  -10.0300 -137.8200      32.4       354       116        60
OIR    2025130    131400  -10.0300 -137.8300      32.3       353       119        60
OIR    2025130    131400  -10.0300 -137.8400      32.1       353       117        60
OIR    2025130    131400  -10.0300 -137.8500      31.9       353       116        60
OIR    2025130    131400  -10.0300 -137.8600      31.7       352       115        60
OIR    2025130    131400  -10.0300 -137.8700      31.5       352       115        60
OIR    2025130    131400  -10.0300 -137.8800      31.5       352       115        60
OIR    2025130    131400  -10.0300 -137.8900      31.5       352       116        60
OIR    2025130    131400  -10.0300 -137.9000      31.4       352       116        60
OIR    2025130    131400  -10.0300 -137.9100      31.4       352       116        60
OIR    2025130    131400  -10.0300 -137.9200      31.3       351       115        60
OIR    2025130    131400  -10.0300 -137.9300      31.2       351       113        60
OIR    2025130    131400  -10.0300 -137.9400      31.0       351       115        60
OIR    2025130    131400  -10.0300 -137.9500      30.8       350       115        60
OIR    2025130    131400  -10.0300 -137.9600      30.5       349       115        60
OIR    2025130    131400  -10.0300 -137.9700      30.4       349       116        60
OIR    2025130    131400  -10.0300 -137.9800      30.3       349       116        60
OIR    2025130    131400  -10.0300 -137.9900      30.2       348       116        60
OIR    2025130    131400  -10.0300 -138.0000      30.0       348       116        60
OIR    2025130    131400  -10.0300 -138.0100      29.9       348       117        60
OIR    2025130    131400  -10.0300 -138.0200      29.7       347       119        60
OIR    2025130    131400  -10.0300 -138.0300      29.5       346       120        60
OIR    2025130    131400  -10.0300 -138.0400      29.3       346       122        60
OIR    2025130    131400  -10.0300 -138.0500      29.2       345       125        60
OIR    2025130    131400  -10.0300 -138.0600      29.1       344       125        60
OIR    2025130    131400  -10.0300 -138.0700      29.1       344       124        60
OIR    2025130    131400  -10.0300 -138.0800      29.1       343       123        60
OIR    2025130    131400  -10.0300 -138.0900      29.0       343       124        60
OIR    2025130    131400  -10.0300 -138.1000      28.9       343       125        60
OIR    2025130    131400  -10.0300 -138.1100      28.8       342       124        60
OIR    2025130    131400  -10.0300 -138.1200      28.7       342       124        60
OIR    2025130    131400  -10.0300 -138.1300      28.6       342       123        60
OIR    2025130    131400  -10.0300 -138.1400      28.5       342       125        60
OIR    2025130    131400  -10.0300 -138.1500      28.4       341       127        60
OIR    2025130    131400  -10.0300 -138.1600      28.3       341       128        60
OIR    2025130    131400  -10.0300 -138.1700      28.3       341       129        60
OIR    2025130    131400  -10.0300 -138.1800      28.2       341       130        60
OIR    2025130    131400  -10.0300 -138.1900      28.2       341       131        60
OIR    2025130    131400  -10.0300 -138.2000      28.1       341       132        60
OIR    2025130    131400  -10.0300 -138.2100      28.1       341       132        60
OIR    2025130    131400  -10.0300 -138.2200      28.0       341       133        60
OIR    2025130    131400  -10.0300 -138.2300      27.9       340       134        60
OIR    2025130    131400  -10.0300 -138.2400      27.9       340       136        60
OIR    2025130    131400  -10.0300 -138.2500      27.7       340       135        60
OIR    2025130    131400  -10.0300 -138.2600      27.7       340       134        60
OIR    2025130    131400  -10.0300 -138.2700      27.6       339       133        60
OIR    2025130    131400  -10.0300 -138.2800      27.6       339       132        60
OIR    2025130    131400  -10.0300 -138.2900      27.5       339       132        60
OIR    2025130    131400  -10.0300 -138.3000      27.4       339       130        60
OIR    2025130    131400  -10.0300 -138.3100      27.3       338       128        60
OIR    2025130    131400  -10.0300 -138.3200      27.0       337       128        60
OIR    2025130    131400  -10.0300 -138.3300      26.7       335       128        60
OIR    2025130    131400  -10.0300 -138.3400      26.5       333       130        60
OIR    2025130    131400  -10.0300 -138.3500      26.4       332       131        60
OIR    2025130    131400  -10.0300 -138.3600      26.1       331       135        60
OIR    2025130    131400  -10.0300 -138.3700      25.9       331       138        60
OIR    2025130    131400  -10.0300 -138.3800      25.9       331       139        60
OIR    2025130    131400  -10.0300 -138.3900      25.9       331       138        60
OIR    2025130    131400  -10.0300 -138.4000      25.8       332       137        60
OIR    2025130    131400  -10.0300 -138.4100      25.8       332       138        60
OIR    2025130    131400  -10.0300 -138.4200      26.0       333       141        60
OIR    2025130    131400  -10.0300 -138.4300      26.3       335       144        60
OIR    2025130    131400  -10.0300 -138.4400      26.4       336       146        60
OIR    2025130    131400  -10.0300 -138.4500      26.4       337       148        60
OIR    2025130    131400  -10.0400 -136.1500      39.7        56       149        60
OIR    2025130    131400  -10.0400 -136.1600      39.9        56       147        60
OIR    2025130    131400  -10.0400 -136.1700      40.1        55       147        60
OIR    2025130    131400  -10.0400 -136.1800      40.2        55       147        60
OIR    2025130    131400  -10.0400 -136.1900      40.3        55       149        60
OIR    2025130    131400  -10.0400 -136.2400      40.4        54       147        60
OIR    2025130    131400  -10.0400 -136.2500      40.4        54       145        60
OIR    2025130    131400  -10.0400 -136.2600      40.4        54       144        60
OIR    2025130    131400  -10.0400 -136.2700      40.4        54       146        60
OIR    2025130    131400  -10.0400 -136.2800      40.4        54       145        60
OIR    2025130    131400  -10.0400 -136.2900      40.4        53       144        60
OIR    2025130    131400  -10.0400 -136.3000      40.4        53       143        60
OIR    2025130    131400  -10.0400 -136.3100      40.4        53       141        60
OIR    2025130    131400  -10.0400 -136.3200      40.3        53       141        60
OIR    2025130    131400  -10.0400 -136.3300      40.3        53       141        60
OIR    2025130    131400  -10.0400 -136.3400      40.2        53       143        60
OIR    2025130    131400  -10.0400 -136.3500      40.1        53       145        60
OIR    2025130    131400  -10.0400 -136.3600      40.0        53       143        60
OIR    2025130    131400  -10.0400 -136.3700      39.9        53       142        60
OIR    2025130    131400  -10.0400 -136.3800      39.8        53       143        60
OIR    2025130    131400  -10.0400 -136.3900      39.6        52       142        60
OIR    2025130    131400  -10.0400 -136.4000      39.3        52       140        60
OIR    2025130    131400  -10.0400 -136.4100      39.2        52       138        60
OIR    2025130    131400  -10.0400 -136.4200      39.0        51       135        60
OIR    2025130    131400  -10.0400 -136.4300      38.7        51       135        60
OIR    2025130    131400  -10.0400 -136.4400      38.5        50       135        60
OIR    2025130    131400  -10.0400 -136.4500      38.3        49       135        60
OIR    2025130    131400  -10.0400 -136.4600      38.2        49       135        60
OIR    2025130    131400  -10.0400 -136.4700      38.1        49       138        60
OIR    2025130    131400  -10.0400 -136.4800      38.1        49       138        60
OIR    2025130    131400  -10.0400 -136.4900      38.1        48       135        60
OIR    2025130    131400  -10.0400 -136.5000      38.1        48       133        60
OIR    2025130    131400  -10.0400 -136.5100      38.1        48       133        60
OIR    2025130    131400  -10.0400 -136.5200      38.1        48       134        60
OIR    2025130    131400  -10.0400 -136.5300      38.1        48       136        60
OIR    2025130    131400  -10.0400 -136.5400      38.1        48       136        60
OIR    2025130    131400  -10.0400 -136.5500      38.1        48       135        60
OIR    2025130    131400  -10.0400 -136.5600      38.1        48       133        60
OIR    2025130    131400  -10.0400 -136.5700      38.1        48       131        60
OIR    2025130    131400  -10.0400 -136.5800      38.1        48       130        60
OIR    2025130    131400  -10.0400 -136.5900      38.1        48       129        60
OIR    2025130    131400  -10.0400 -136.6000      38.1        48       129        60
OIR    2025130    131400  -10.0400 -136.6100      38.1        48       129        60
OIR    2025130    131400  -10.0400 -136.6200      37.9        48       124        60
OIR    2025130    131400  -10.0400 -136.6300      37.5        49       121        60
OIR    2025130    131400  -10.0400 -136.6400      37.0        49       116        60
OIR    2025130    131400  -10.0400 -136.6500      36.4        49       116        60
OIR    2025130    131400  -10.0400 -136.6600      35.9        49       116        60
OIR    2025130    131400  -10.0400 -136.6700      35.7        49       116        60
OIR    2025130    131400  -10.0400 -136.6800      35.4        49       116        60
OIR    2025130    131400  -10.0400 -136.6900      35.1        49       115        60
OIR    2025130    131400  -10.0400 -136.7000      34.9        49       114        60
OIR    2025130    131400  -10.0400 -136.7100      34.6        49       115        60
OIR    2025130    131400  -10.0400 -136.7200      34.1        49       115        60
OIR    2025130    131400  -10.0400 -136.7300      33.7        49       116        60
OIR    2025130    131400  -10.0400 -136.7400      33.5        49       116        60
OIR    2025130    131400  -10.0400 -136.7500      33.4        49       112        60
OIR    2025130    131400  -10.0400 -136.7600      33.4        49       112        60
OIR    2025130    131400  -10.0400 -136.7700      33.4        49       113        60
OIR    2025130    131400  -10.0400 -136.7800      33.5        49       114        60
OIR    2025130    131400  -10.0400 -136.7900      33.6        49       116        60
OIR    2025130    131400  -10.0400 -136.8000      33.7        49       119        60
OIR    2025130    131400  -10.0400 -136.8100      33.7        49       120        60
OIR    2025130    131400  -10.0400 -136.8200      33.7        49       121        60
OIR    2025130    131400  -10.0400 -136.8300      33.7        49       121        60
OIR    2025130    131400  -10.0400 -136.8400      33.7        49       123        60
OIR    2025130    131400  -10.0400 -136.8500      33.5        49       122        60
OIR    2025130    131400  -10.0400 -136.8600      33.3        49       121        60
OIR    2025130    131400  -10.0400 -136.8700      32.8        48       117        60
OIR    2025130    131400  -10.0400 -136.8800      32.7        47       114        60
OIR    2025130    131400  -10.0400 -136.8900      32.7        46       113        60
OIR    2025130    131400  -10.0400 -136.9000      32.7        43       113        60
OIR    2025130    131400  -10.0400 -136.9100      32.5        40       114        60
OIR    2025130    131400  -10.0400 -136.9200      32.8        36       115        60
OIR    2025130    131400  -10.0400 -136.9300      32.8        35       116        60
OIR    2025130    131400  -10.0400 -136.9400      33.2        34       115        60
OIR    2025130    131400  -10.0400 -136.9500      33.4        34       110        60
OIR    2025130    131400  -10.0400 -136.9600      33.7        35       107        60
OIR    2025130    131400  -10.0400 -136.9700      34.0        35       107        60
OIR    2025130    131400  -10.0400 -136.9800      34.2        36       107        60
OIR    2025130    131400  -10.0400 -136.9900      34.3        36       107        60
OIR    2025130    131400  -10.0400 -137.0000      34.5        37       107        60
OIR    2025130    131400  -10.0400 -137.0100      34.5        37       107        60
OIR    2025130    131400  -10.0400 -137.0200      34.3        38       114        60
OIR    2025130    131400  -10.0400 -137.0300      34.3        38       119        60
OIR    2025130    131400  -10.0400 -137.0400      34.1        39       121        60
OIR    2025130    131400  -10.0400 -137.0500      33.5        39       122        60
OIR    2025130    131400  -10.0400 -137.0600      32.0        40       119        60
OIR    2025130    131400  -10.0400 -137.0700      31.1        41       116        60
OIR    2025130    131400  -10.0400 -137.0800      30.8        41       114        60
OIR    2025130    131400  -10.0400 -137.0900      30.6        41       112        60
OIR    2025130    131400  -10.0400 -137.1000      30.6        42       110        60
OIR    2025130    131400  -10.0400 -137.1100      30.5        42       111        60
OIR    2025130    131400  -10.0400 -137.1200      30.6        42       113        60
OIR    2025130    131400  -10.0400 -137.1300      30.7        42       113        60
OIR    2025130    131400  -10.0400 -137.1400      30.8        42       113        60
OIR    2025130    131400  -10.0400 -137.1500      30.9        42       113        60
OIR    2025130    131400  -10.0400 -137.1600      31.1        43       113        60
OIR    2025130    131400  -10.0400 -137.1700      31.2        44       114        60
OIR    2025130    131400  -10.0400 -137.1800      31.8        46       114        60
OIR    2025130    131400  -10.0400 -137.1900      32.4        47       112        60
OIR    2025130    131400  -10.0400 -137.2000      32.6        48       112        60
OIR    2025130    131400  -10.0400 -137.2100      32.7        48       114        60
OIR    2025130    131400  -10.0400 -137.2200      32.8        48       113        60
OIR    2025130    131400  -10.0400 -137.2300      33.0        48       111        60
OIR    2025130    131400  -10.0400 -137.2400      33.5        47       109        60
OIR    2025130    131400  -10.0400 -137.2500      34.3        45       107        60
OIR    2025130    131400  -10.0400 -137.2600      35.4        41       104        60
OIR    2025130    131400  -10.0400 -137.2700      36.2        38       104        60
OIR    2025130    131400  -10.0400 -137.2800      36.8        37       103        60
OIR    2025130    131400  -10.0400 -137.2900      37.1        36       103        60
OIR    2025130    131400  -10.0400 -137.3000      37.1        36       103        60
OIR    2025130    131400  -10.0400 -137.3100      37.1        36       103        60
OIR    2025130    131400  -10.0400 -137.3200      37.0        35       103        60
OIR    2025130    131400  -10.0400 -137.3300      36.8        35       103        60
OIR    2025130    131400  -10.0400 -137.3400      36.6        33       104        60
OIR    2025130    131400  -10.0400 -137.3500      36.2        30       104        60
OIR    2025130    131400  -10.0400 -137.3600      36.3        29       104        60
OIR    2025130    131400  -10.0400 -137.3700      36.4        28       108        60
OIR    2025130    131400  -10.0400 -137.3800      36.5        27       111        60
OIR    2025130    131400  -10.0400 -137.3900      36.6        26       109        60
OIR    2025130    131400  -10.0400 -137.4000      36.6        24       107        60
OIR    2025130    131400  -10.0400 -137.4100      36.1        21       104        60
OIR    2025130    131400  -10.0400 -137.4200      35.2        17       104        60
OIR    2025130    131400  -10.0400 -137.4300      34.9        15       104        60
OIR    2025130    131400  -10.0400 -137.4400      34.9        13       104        60
OIR    2025130    131400  -10.0400 -137.4500      35.0        13       104        60
OIR    2025130    131400  -10.0400 -137.4600      35.1        12       105        60
OIR    2025130    131400  -10.0400 -137.4700      35.3        12       105        60
OIR    2025130    131400  -10.0400 -137.4800      35.4        12       104        60
OIR    2025130    131400  -10.0400 -137.4900      35.5        12       104        60
OIR    2025130    131400  -10.0400 -137.5000      35.6        11       103        60
OIR    2025130    131400  -10.0400 -137.5100      35.6        11       103        60
OIR    2025130    131400  -10.0400 -137.5200      35.6        11       103        60
OIR    2025130    131400  -10.0400 -137.5300      35.6        11       103        60
OIR    2025130    131400  -10.0400 -137.5400      35.7        10       103        60
OIR    2025130    131400  -10.0400 -137.5500      35.6        10       103        60
OIR    2025130    131400  -10.0400 -137.5600      35.6        10       103        60
OIR    2025130    131400  -10.0400 -137.5700      35.5         9       103        60
OIR    2025130    131400  -10.0400 -137.5800      35.5         9       103        60
OIR    2025130    131400  -10.0400 -137.5900      35.4         9       103        60
OIR    2025130    131400  -10.0400 -137.6000      35.4         9       103        60
OIR    2025130    131400  -10.0400 -137.6100      35.3         8       103        60
OIR    2025130    131400  -10.0400 -137.6200      35.2         8       103        60
OIR    2025130    131400  -10.0400 -137.6300      35.1         8       103        60
OIR    2025130    131400  -10.0400 -137.6400      35.1         7       103        60
OIR    2025130    131400  -10.0400 -137.6500      35.0         7       103        60
OIR    2025130    131400  -10.0400 -137.6600      34.9         7       103        60
OIR    2025130    131400  -10.0400 -137.6700      34.9         6       103        60
OIR    2025130    131400  -10.0400 -137.6800      34.9         6       103        60
OIR    2025130    131400  -10.0400 -137.6900      34.9         6       103        60
OIR    2025130    131400  -10.0400 -137.7000      34.9         5       103        60
OIR    2025130    131400  -10.0400 -137.7100      34.9         5       103        60
OIR    2025130    131400  -10.0400 -137.7200      34.9         5       104        60
OIR    2025130    131400  -10.0400 -137.7300      34.9         5       104        60
OIR    2025130    131400  -10.0400 -137.7400      34.8         4       105        60
OIR    2025130    131400  -10.0400 -137.7500      34.6         3       108        60
OIR    2025130    131400  -10.0400 -137.7600      34.2         0       112        60
OIR    2025130    131400  -10.0400 -137.7700      33.5       357       114        60
OIR    2025130    131400  -10.0400 -137.7800      33.0       355       115        60
OIR    2025130    131400  -10.0400 -137.7900      32.8       354       115        60
OIR    2025130    131400  -10.0400 -137.8000      32.6       354       115        60
OIR    2025130    131400  -10.0400 -137.8100      32.5       354       116        60
OIR    2025130    131400  -10.0400 -137.8200      32.4       354       116        60
OIR    2025130    131400  -10.0400 -137.8300      32.3       353       117        60
OIR    2025130    131400  -10.0400 -137.8400      32.2       353       117        60
OIR    2025130    131400  -10.0400 -137.8500      32.1       353       117        60
OIR    2025130    131400  -10.0400 -137.8600      31.8       353       117        60
OIR    2025130    131400  -10.0400 -137.8700      31.7       352       117        60
OIR    2025130    131400  -10.0400 -137.8800      31.5       352       117        60
OIR    2025130    131400  -10.0400 -137.8900      31.5       352       119        60
OIR    2025130    131400  -10.0400 -137.9000      31.4       352       121        60
OIR    2025130    131400  -10.0400 -137.9100      31.4       352       123        60
OIR    2025130    131400  -10.0400 -137.9200      31.3       351       117        60
OIR    2025130    131400  -10.0400 -137.9300      31.2       351       115        60
OIR    2025130    131400  -10.0400 -137.9400      31.0       351       116        60
OIR    2025130    131400  -10.0400 -137.9500      30.7       350       116        60
OIR    2025130    131400  -10.0400 -137.9600      30.5       349       116        60
OIR    2025130    131400  -10.0400 -137.9700      30.4       349       116        60
OIR    2025130    131400  -10.0400 -137.9800      30.3       349       119        60
OIR    2025130    131400  -10.0400 -137.9900      30.1       348       120        60
OIR    2025130    131400  -10.0400 -138.0000      29.9       348       120        60
OIR    2025130    131400  -10.0400 -138.0100      29.7       347       120        60
OIR    2025130    131400  -10.0400 -138.0200      29.5       346       121        60
OIR    2025130    131400  -10.0400 -138.0300      29.3       346       123        60
OIR    2025130    131400  -10.0400 -138.0400      29.2       345       125        60
OIR    2025130    131400  -10.0400 -138.0500      29.1       344       128        60
OIR    2025130    131400  -10.0400 -138.0600      29.0       344       128        60
OIR    2025130    131400  -10.0400 -138.0700      29.0       343       126        60
OIR    2025130    131400  -10.0400 -138.0800      28.9       343       125        60
OIR    2025130    131400  -10.0400 -138.0900      28.8       343       124        60
OIR    2025130    131400  -10.0400 -138.1000      28.7       342       124        60
OIR    2025130    131400  -10.0400 -138.1100      28.6       342       124        60
OIR    2025130    131400  -10.0400 -138.1200      28.6       342       123        60
OIR    2025130    131400  -10.0400 -138.1300      28.5       342       121        60
OIR    2025130    131400  -10.0400 -138.1400      28.4       342       124        60
OIR    2025130    131400  -10.0400 -138.1500      28.3       342       127        60
OIR    2025130    131400  -10.0400 -138.1600      28.3       341       128        60
OIR    2025130    131400  -10.0400 -138.1700      28.2       341       129        60
OIR    2025130    131400  -10.0400 -138.1800      28.2       341       131        60
OIR    2025130    131400  -10.0400 -138.1900      28.2       341       132        60
OIR    2025130    131400  -10.0400 -138.2000      28.1       341       133        60
OIR    2025130    131400  -10.0400 -138.2100      28.1       341       134        60
OIR    2025130    131400  -10.0400 -138.2200      28.0       341       136        60
OIR    2025130    131400  -10.0400 -138.2300      27.9       341       137        60
OIR    2025130    131400  -10.0400 -138.2400      27.9       340       139        60
OIR    2025130    131400  -10.0400 -138.2500      27.8       340       137        60
OIR    2025130    131400  -10.0400 -138.2600      27.7       340       135        60
OIR    2025130    131400  -10.0400 -138.2700      27.6       339       134        60
OIR    2025130    131400  -10.0400 -138.2800      27.6       339       134        60
OIR    2025130    131400  -10.0400 -138.2900      27.6       339       133        60
OIR    2025130    131400  -10.0400 -138.3000      27.5       339       131        60
OIR    2025130    131400  -10.0400 -138.3100      27.5       339       127        60
OIR    2025130    131400  -10.0400 -138.3200      27.3       338       127        60
OIR    2025130    131400  -10.0400 -138.3300      27.1       337       127        60
OIR    2025130    131400  -10.0400 -138.3400      26.8       335       130        60
OIR    2025130    131400  -10.0400 -138.3500      26.6       333       133        60
OIR    2025130    131400  -10.0400 -138.3600      26.5       333       139        60
OIR    2025130    131400  -10.0400 -138.3700      26.3       332       143        60
OIR    2025130    131400  -10.0400 -138.3800      26.2       332       144        60
OIR    2025130    131400  -10.0400 -138.3900      26.0       332       143        60
OIR    2025130    131400  -10.0400 -138.4000      26.0       332       141        60
OIR    2025130    131400  -10.0400 -138.4100      26.1       333       140        60
OIR    2025130    131400  -10.0400 -138.4200      26.3       334       140        60
OIR    2025130    131400  -10.0400 -138.4300      26.4       335       143        60
OIR    2025130    131400  -10.0400 -138.4400      26.5       336       146        60
OIR    2025130    131400  -10.0400 -138.4500      26.6       337       148        60
OIR    2025130    131400  -10.0500 -136.1500      39.7        55       149        60
OIR    2025130    131400  -10.0500 -136.1600      39.9        55       147        60
OIR    2025130    131400  -10.0500 -136.1700      40.1        55       147        60
OIR    2025130    131400  -10.0500 -136.1800      40.2        55       148        60
OIR    2025130    131400  -10.0500 -136.1900      40.3        55       149        60
OIR    2025130    131400  -10.0500 -136.2300      40.4        54       149        60
OIR    2025130    131400  -10.0500 -136.2400      40.4        54       146        60
OIR    2025130    131400  -10.0500 -136.2500      40.4        54       145        60
OIR    2025130    131400  -10.0500 -136.2600      40.4        54       145        60
OIR    2025130    131400  -10.0500 -136.2700      40.4        54       147        60
OIR    2025130    131400  -10.0500 -136.2800      40.4        53       146        60
OIR    2025130    131400  -10.0500 -136.2900      40.4        53       144        60
OIR    2025130    131400  -10.0500 -136.3000      40.4        53       142        60
OIR    2025130    131400  -10.0500 -136.3100      40.4        53       140        60
OIR    2025130    131400  -10.0500 -136.3200      40.3        53       140        60
OIR    2025130    131400  -10.0500 -136.3300      40.3        53       140        60
OIR    2025130    131400  -10.0500 -136.3400      40.2        53       142        60
OIR    2025130    131400  -10.0500 -136.3500      40.1        53       144        60
OIR    2025130    131400  -10.0500 -136.3600      40.1        53       142        60
OIR    2025130    131400  -10.0500 -136.3700      40.0        53       141        60
OIR    2025130    131400  -10.0500 -136.3800      39.8        53       143        60
OIR    2025130    131400  -10.0500 -136.3900      39.6        52       142        60
OIR    2025130    131400  -10.0500 -136.4000      39.4        52       139        60
OIR    2025130    131400  -10.0500 -136.4100      39.2        51       136        60
OIR    2025130    131400  -10.0500 -136.4200      39.0        51       135        60
OIR    2025130    131400  -10.0500 -136.4300      38.7        50       134        60
OIR    2025130    131400  -10.0500 -136.4400      38.5        49       134        60
OIR    2025130    131400  -10.0500 -136.4500      38.3        49       134        60
OIR    2025130    131400  -10.0500 -136.4600      38.2        49       135        60
OIR    2025130    131400  -10.0500 -136.4700      38.1        49       137        60
OIR    2025130    131400  -10.0500 -136.4800      38.1        48       137        60
OIR    2025130    131400  -10.0500 -136.4900      38.1        48       134        60
OIR    2025130    131400  -10.0500 -136.5000      38.1        48       132        60
OIR    2025130    131400  -10.0500 -136.5100      38.1        48       132        60
OIR    2025130    131400  -10.0500 -136.5200      38.1        48       133        60
OIR    2025130    131400  -10.0500 -136.5300      38.1        48       136        60
OIR    2025130    131400  -10.0500 -136.5400      38.1        48       136        60
OIR    2025130    131400  -10.0500 -136.5500      38.1        48       136        60
OIR    2025130    131400  -10.0500 -136.5600      38.1        48       134        60
OIR    2025130    131400  -10.0500 -136.5700      38.1        48       133        60
OIR    2025130    131400  -10.0500 -136.5800      38.1        48       129        60
OIR    2025130    131400  -10.0500 -136.5900      38.1        48       127        60
OIR    2025130    131400  -10.0500 -136.6000      38.1        48       127        60
OIR    2025130    131400  -10.0500 -136.6100      38.1        48       127        60
OIR    2025130    131400  -10.0500 -136.6200      38.0        48       124        60
OIR    2025130    131400  -10.0500 -136.6300      37.9        48       121        60
OIR    2025130    131400  -10.0500 -136.6400      37.5        48       119        60
OIR    2025130    131400  -10.0500 -136.6500      37.0        49       117        60
OIR    2025130    131400  -10.0500 -136.6600      36.5        49       116        60
OIR    2025130    131400  -10.0500 -136.6700      36.2        49       116        60
OIR    2025130    131400  -10.0500 -136.6800      35.9        49       116        60
OIR    2025130    131400  -10.0500 -136.6900      35.7        49       116        60
OIR    2025130    131400  -10.0500 -136.7000      35.5        49       115        60
OIR    2025130    131400  -10.0500 -136.7100      35.2        49       116        60
OIR    2025130    131400  -10.0500 -136.7200      34.8        49       116        60
OIR    2025130    131400  -10.0500 -136.7300      34.2        49       116        60
OIR    2025130    131400  -10.0500 -136.7400      33.8        49       116        60
OIR    2025130    131400  -10.0500 -136.7500      33.6        49       115        60
OIR    2025130    131400  -10.0500 -136.7600      33.7        49       115        60
OIR    2025130    131400  -10.0500 -136.7700      33.6        49       115        60
OIR    2025130    131400  -10.0500 -136.7800      33.6        49       115        60
OIR    2025130    131400  -10.0500 -136.7900      33.7        49       114        60
OIR    2025130    131400  -10.0500 -136.8000      33.8        49       116        60
OIR    2025130    131400  -10.0500 -136.8100      33.8        49       116        60
OIR    2025130    131400  -10.0500 -136.8200      33.8        49       116        60
OIR    2025130    131400  -10.0500 -136.8300      33.8        49       117        60
OIR    2025130    131400  -10.0500 -136.8400      33.8        49       120        60
OIR    2025130    131400  -10.0500 -136.8500      33.7        49       120        60
OIR    2025130    131400  -10.0500 -136.8600      33.5        48       119        60
OIR    2025130    131400  -10.0500 -136.8700      33.0        48       116        60
OIR    2025130    131400  -10.0500 -136.8800      32.8        46       114        60
OIR    2025130    131400  -10.0500 -136.8900      32.8        43       113        60
OIR    2025130    131400  -10.0500 -136.9000      32.9        40       114        60
OIR    2025130    131400  -10.0500 -136.9100      32.9        37       113        60
OIR    2025130    131400  -10.0500 -136.9200      33.1        35       114        60
OIR    2025130    131400  -10.0500 -136.9300      33.3        34       115        60
OIR    2025130    131400  -10.0500 -136.9400      33.4        34       115        60
OIR    2025130    131400  -10.0500 -136.9500      33.5        34       111        60
OIR    2025130    131400  -10.0500 -136.9600      33.8        35       110        60
OIR    2025130    131400  -10.0500 -136.9700      34.1        35       110        60
OIR    2025130    131400  -10.0500 -136.9800      34.3        35       110        60
OIR    2025130    131400  -10.0500 -136.9900      34.4        36       109        60
OIR    2025130    131400  -10.0500 -137.0000      34.6        37       108        60
OIR    2025130    131400  -10.0500 -137.0100      34.7        37       107        60
OIR    2025130    131400  -10.0500 -137.0200      34.7        37       112        60
OIR    2025130    131400  -10.0500 -137.0300      34.5        37       116        60
OIR    2025130    131400  -10.0500 -137.0400      34.2        38       117        60
OIR    2025130    131400  -10.0500 -137.0500      33.7        39       120        60
OIR    2025130    131400  -10.0500 -137.0600      32.5        40       119        60
OIR    2025130    131400  -10.0500 -137.0700      31.3        40       117        60
OIR    2025130    131400  -10.0500 -137.0800      30.9        41       116        60
OIR    2025130    131400  -10.0500 -137.0900      30.7        41       114        60
OIR    2025130    131400  -10.0500 -137.1000      30.6        41       112        60
OIR    2025130    131400  -10.0500 -137.1100      30.6        42       112        60
OIR    2025130    131400  -10.0500 -137.1200      30.6        42       113        60
OIR    2025130    131400  -10.0500 -137.1300      30.8        42       114        60
OIR    2025130    131400  -10.0500 -137.1400      30.9        42       114        60
OIR    2025130    131400  -10.0500 -137.1500      31.1        42       114        60
OIR    2025130    131400  -10.0500 -137.1600      31.5        43       115        60
OIR    2025130    131400  -10.0500 -137.1700      31.6        44       116        60
OIR    2025130    131400  -10.0500 -137.1800      32.0        45       117        60
OIR    2025130    131400  -10.0500 -137.1900      32.4        46       116        60
OIR    2025130    131400  -10.0500 -137.2000      32.8        47       116        60
OIR    2025130    131400  -10.0500 -137.2100      32.8        48       116        60
OIR    2025130    131400  -10.0500 -137.2200      32.9        48       113        60
OIR    2025130    131400  -10.0500 -137.2300      33.4        47       110        60
OIR    2025130    131400  -10.0500 -137.2400      34.4        45       109        60
OIR    2025130    131400  -10.0500 -137.2500      35.5        41       108        60
OIR    2025130    131400  -10.0500 -137.2600      36.5        38       105        60
OIR    2025130    131400  -10.0500 -137.2700      37.0        36       104        60
OIR    2025130    131400  -10.0500 -137.2800      37.3        36       103        60
OIR    2025130    131400  -10.0500 -137.2900      37.3        36       103        60
OIR    2025130    131400  -10.0500 -137.3000      37.2        36       103        60
OIR    2025130    131400  -10.0500 -137.3100      37.2        35       103        60
OIR    2025130    131400  -10.0500 -137.3200      37.1        35       103        60
OIR    2025130    131400  -10.0500 -137.3300      36.9        34       103        60
OIR    2025130    131400  -10.0500 -137.3400      36.6        33       103        60
OIR    2025130    131400  -10.0500 -137.3500      36.3        30       104        60
OIR    2025130    131400  -10.0500 -137.3600      36.4        29       104        60
OIR    2025130    131400  -10.0500 -137.3700      36.4        28       107        60
OIR    2025130    131400  -10.0500 -137.3800      36.4        27       109        60
OIR    2025130    131400  -10.0500 -137.3900      36.4        25       107        60
OIR    2025130    131400  -10.0500 -137.4000      36.4        23       107        60
OIR    2025130    131400  -10.0500 -137.4100      35.7        19       105        60
OIR    2025130    131400  -10.0500 -137.4200      35.0        15       105        60
OIR    2025130    131400  -10.0500 -137.4300      34.7        13       104        60
OIR    2025130    131400  -10.0500 -137.4400      34.7        13       107        60
OIR    2025130    131400  -10.0500 -137.4500      34.8        12       108        60
OIR    2025130    131400  -10.0500 -137.4600      35.0        12       109        60
OIR    2025130    131400  -10.0500 -137.4700      35.1        12       110        60
OIR    2025130    131400  -10.0500 -137.4800      35.2        12       110        60
OIR    2025130    131400  -10.0500 -137.4900      35.3        11       108        60
OIR    2025130    131400  -10.0500 -137.5000      35.4        11       107        60
OIR    2025130    131400  -10.0500 -137.5100      35.5        11       105        60
OIR    2025130    131400  -10.0500 -137.5200      35.5        11       105        60
OIR    2025130    131400  -10.0500 -137.5300      35.6        10       105        60
OIR    2025130    131400  -10.0500 -137.5400      35.6        10       104        60
OIR    2025130    131400  -10.0500 -137.5500      35.6        10       104        60
OIR    2025130    131400  -10.0500 -137.5600      35.5        10       103        60
OIR    2025130    131400  -10.0500 -137.5700      35.4         9       103        60
OIR    2025130    131400  -10.0500 -137.5800      35.4         9       103        60
OIR    2025130    131400  -10.0500 -137.5900      35.3         9       103        60
OIR    2025130    131400  -10.0500 -137.6000      35.3         8       103        60
OIR    2025130    131400  -10.0500 -137.6100      35.2         8       104        60
OIR    2025130    131400  -10.0500 -137.6200      35.1         8       103        60
OIR    2025130    131400  -10.0500 -137.6300      35.0         7       103        60
OIR    2025130    131400  -10.0500 -137.6400      34.9         7       103        60
OIR    2025130    131400  -10.0500 -137.6500      34.8         7       103        60
OIR    2025130    131400  -10.0500 -137.6600      34.8         7       104        60
OIR    2025130    131400  -10.0500 -137.6700      34.8         6       104        60
OIR    2025130    131400  -10.0500 -137.6800      34.8         6       104        60
OIR    2025130    131400  -10.0500 -137.6900      34.8         6       104        60
OIR    2025130    131400  -10.0500 -137.7000      34.8         5       104        60
OIR    2025130    131400  -10.0500 -137.7100      34.8         5       104        60
OIR    2025130    131400  -10.0500 -137.7200      34.8         5       104        60
OIR    2025130    131400  -10.0500 -137.7300      34.8         5       104        60
OIR    2025130    131400  -10.0500 -137.7400      34.7         4       107        60
OIR    2025130    131400  -10.0500 -137.7500      34.5         2       110        60
OIR    2025130    131400  -10.0500 -137.7600      34.1       360       113        60
OIR    2025130    131400  -10.0500 -137.7700      33.5       357       115        60
OIR    2025130    131400  -10.0500 -137.7800      33.0       355       116        60
OIR    2025130    131400  -10.0500 -137.7900      32.8       354       115        60
OIR    2025130    131400  -10.0500 -137.8000      32.6       354       114        60
OIR    2025130    131400  -10.0500 -137.8100      32.4       354       115        60
OIR    2025130    131400  -10.0500 -137.8200      32.4       354       116        60
OIR    2025130    131400  -10.0500 -137.8300      32.3       353       117        60
OIR    2025130    131400  -10.0500 -137.8400      32.2       353       117        60
OIR    2025130    131400  -10.0500 -137.8500      32.1       353       117        60
OIR    2025130    131400  -10.0500 -137.8600      31.8       353       116        60
OIR    2025130    131400  -10.0500 -137.8700      31.6       352       116        60
OIR    2025130    131400  -10.0500 -137.8800      31.5       352       116        60
OIR    2025130    131400  -10.0500 -137.8900      31.5       352       116        60
OIR    2025130    131400  -10.0500 -137.9000      31.4       352       117        60
OIR    2025130    131400  -10.0500 -137.9100      31.3       352       119        60
OIR    2025130    131400  -10.0500 -137.9200      31.3       351       116        60
OIR    2025130    131400  -10.0500 -137.9300      31.1       351       116        60
OIR    2025130    131400  -10.0500 -137.9400      30.9       350       116        60
OIR    2025130    131400  -10.0500 -137.9500      30.6       350       116        60
OIR    2025130    131400  -10.0500 -137.9600      30.4       349       116        60
OIR    2025130    131400  -10.0500 -137.9700      30.3       349       116        60
OIR    2025130    131400  -10.0500 -137.9800      30.2       348       121        60
OIR    2025130    131400  -10.0500 -137.9900      30.0       348       123        60
OIR    2025130    131400  -10.0500 -138.0000      29.8       347       124        60
OIR    2025130    131400  -10.0500 -138.0100      29.6       347       124        60
OIR    2025130    131400  -10.0500 -138.0200      29.4       346       124        60
OIR    2025130    131400  -10.0500 -138.0300      29.2       345       125        60
OIR    2025130    131400  -10.0500 -138.0400      29.1       344       126        60
OIR    2025130    131400  -10.0500 -138.0500      28.9       344       127        60
OIR    2025130    131400  -10.0500 -138.0600      28.8       343       126        60
OIR    2025130    131400  -10.0500 -138.0700      28.8       343       125        60
OIR    2025130    131400  -10.0500 -138.0800      28.7       343       124        60
OIR    2025130    131400  -10.0500 -138.0900      28.7       343       123        60
OIR    2025130    131400  -10.0500 -138.1000      28.6       342       123        60
OIR    2025130    131400  -10.0500 -138.1100      28.6       342       122        60
OIR    2025130    131400  -10.0500 -138.1200      28.5       342       122        60
OIR    2025130    131400  -10.0500 -138.1300      28.4       342       122        60
OIR    2025130    131400  -10.0500 -138.1400      28.3       342       125        60
OIR    2025130    131400  -10.0500 -138.1500      28.3       342       128        60
OIR    2025130    131400  -10.0500 -138.1600      28.3       341       129        60
OIR    2025130    131400  -10.0500 -138.1700      28.2       341       130        60
OIR    2025130    131400  -10.0500 -138.1800      28.2       341       131        60
OIR    2025130    131400  -10.0500 -138.1900      28.2       341       133        60
OIR    2025130    131400  -10.0500 -138.2000      28.1       341       135        60
OIR    2025130    131400  -10.0500 -138.2100      28.1       341       136        60
OIR    2025130    131400  -10.0500 -138.2200      28.0       341       137        60
OIR    2025130    131400  -10.0500 -138.2300      28.0       341       138        60
OIR    2025130    131400  -10.0500 -138.2400      27.9       341       139        60
OIR    2025130    131400  -10.0500 -138.2500      27.8       340       137        60
OIR    2025130    131400  -10.0500 -138.2600      27.7       340       135        60
OIR    2025130    131400  -10.0500 -138.2700      27.6       339       135        60
OIR    2025130    131400  -10.0500 -138.2800      27.6       339       135        60
OIR    2025130    131400  -10.0500 -138.2900      27.6       339       134        60
OIR    2025130    131400  -10.0500 -138.3000      27.6       339       132        60
OIR    2025130    131400  -10.0500 -138.3100      27.5       339       129        60
OIR    2025130    131400  -10.0500 -138.3200      27.5       339       129        60
OIR    2025130    131400  -10.0500 -138.3300      27.4       338       130        60
OIR    2025130    131400  -10.0500 -138.3400      27.2       337       131        60
OIR    2025130    131400  -10.0500 -138.3500      27.0       335       132        60
OIR    2025130    131400  -10.0500 -138.3600      26.8       334       137        60
OIR    2025130    131400  -10.0500 -138.3700      26.6       334       141        60
OIR    2025130    131400  -10.0500 -138.3800      26.4       333       143        60
OIR    2025130    131400  -10.0500 -138.3900      26.3       333       143        60
OIR    2025130    131400  -10.0500 -138.4000      26.3       333       143        60
OIR    2025130    131400  -10.0500 -138.4100      26.4       334       142        60
OIR    2025130    131400  -10.0500 -138.4200      26.5       335       142        60
OIR    2025130    131400  -10.0500 -138.4300      26.6       336       143        60
OIR    2025130    131400  -10.0500 -138.4400      26.7       336       145        60
OIR    2025130    131400  -10.0600 -136.1500      39.8        55       148        60
OIR    2025130    131400  -10.0600 -136.1600      40.0        55       148        60
OIR    2025130    131400  -10.0600 -136.1700      40.1        55       148        60
OIR    2025130    131400  -10.0600 -136.1800      40.3        54       148        60
OIR    2025130    131400  -10.0600 -136.1900      40.3        54       149        60
OIR    2025130    131400  -10.0600 -136.2300      40.4        54       148        60
OIR    2025130    131400  -10.0600 -136.2400      40.4        54       145        60
OIR    2025130    131400  -10.0600 -136.2500      40.4        54       146        60
OIR    2025130    131400  -10.0600 -136.2600      40.4        54       146        60
OIR    2025130    131400  -10.0600 -136.2700      40.4        53       147        60
OIR    2025130    131400  -10.0600 -136.2800      40.4        53       145        60
OIR    2025130    131400  -10.0600 -136.2900      40.4        53       143        60
OIR    2025130    131400  -10.0600 -136.3000      40.4        53       141        60
OIR    2025130    131400  -10.0600 -136.3100      40.4        53       140        60
OIR    2025130    131400  -10.0600 -136.3200      40.4        53       140        60
OIR    2025130    131400  -10.0600 -136.3300      40.3        53       140        60
OIR    2025130    131400  -10.0600 -136.3400      40.3        53       139        60
OIR    2025130    131400  -10.0600 -136.3500      40.2        53       139        60
OIR    2025130    131400  -10.0600 -136.3600      40.1        53       138        60
OIR    2025130    131400  -10.0600 -136.3700      40.0        53       139        60
OIR    2025130    131400  -10.0600 -136.3800      39.9        52       143        60
OIR    2025130    131400  -10.0600 -136.3900      39.8        52       141        60
OIR    2025130    131400  -10.0600 -136.4000      39.6        51       137        60
OIR    2025130    131400  -10.0600 -136.4100      39.4        51       135        60
OIR    2025130    131400  -10.0600 -136.4200      39.2        50       135        60
OIR    2025130    131400  -10.0600 -136.4300      38.8        50       134        60
OIR    2025130    131400  -10.0600 -136.4400      38.5        49       133        60
OIR    2025130    131400  -10.0600 -136.4500      38.4        49       134        60
OIR    2025130    131400  -10.0600 -136.4600      38.2        49       134        60
OIR    2025130    131400  -10.0600 -136.4700      38.2        48       135        60
OIR    2025130    131400  -10.0600 -136.4800      38.1        48       135        60
OIR    2025130    131400  -10.0600 -136.4900      38.1        48       132        60
OIR    2025130    131400  -10.0600 -136.5000      38.1        48       131        60
OIR    2025130    131400  -10.0600 -136.5100      38.1        48       132        60
OIR    2025130    131400  -10.0600 -136.5200      38.1        48       133        60
OIR    2025130    131400  -10.0600 -136.5300      38.1        48       136        60
OIR    2025130    131400  -10.0600 -136.5400      38.2        48       137        60
OIR    2025130    131400  -10.0600 -136.5500      38.1        48       137        60
OIR    2025130    131400  -10.0600 -136.5600      38.1        48       136        60
OIR    2025130    131400  -10.0600 -136.5700      38.1        48       134        60
OIR    2025130    131400  -10.0600 -136.5800      38.1        48       129        60
OIR    2025130    131400  -10.0600 -136.5900      38.1        48       125        60
OIR    2025130    131400  -10.0600 -136.6000      38.1        48       125        60
OIR    2025130    131400  -10.0600 -136.6100      38.1        48       125        60
OIR    2025130    131400  -10.0600 -136.6200      38.1        48       124        60
OIR    2025130    131400  -10.0600 -136.6300      38.0        48       122        60
OIR    2025130    131400  -10.0600 -136.6400      37.8        48       120        60
OIR    2025130    131400  -10.0600 -136.6500      37.5        48       119        60
OIR    2025130    131400  -10.0600 -136.6600      37.1        48       116        60
OIR    2025130    131400  -10.0600 -136.6700      36.8        48       116        60
OIR    2025130    131400  -10.0600 -136.6800      36.6        48       116        60
OIR    2025130    131400  -10.0600 -136.6900      36.4        48       116        60
OIR    2025130    131400  -10.0600 -136.7000      36.2        48       116        60
OIR    2025130    131400  -10.0600 -136.7100      36.0        48       116        60
OIR    2025130    131400  -10.0600 -136.7200      35.7        48       116        60
OIR    2025130    131400  -10.0600 -136.7300      35.3        48       116        60
OIR    2025130    131400  -10.0600 -136.7400      35.0        48       116        60
OIR    2025130    131400  -10.0600 -136.7500      34.8        48       117        60
OIR    2025130    131400  -10.0600 -136.7600      34.7        48       117        60
OIR    2025130    131400  -10.0600 -136.7700      34.5        48       116        60
OIR    2025130    131400  -10.0600 -136.7800      34.2        48       115        60
OIR    2025130    131400  -10.0600 -136.7900      34.1        49       113        60
OIR    2025130    131400  -10.0600 -136.8000      34.1        49       113        60
OIR    2025130    131400  -10.0600 -136.8100      34.1        49       114        60
OIR    2025130    131400  -10.0600 -136.8200      34.1        49       114        60
OIR    2025130    131400  -10.0600 -136.8300      34.1        49       114        60
OIR    2025130    131400  -10.0600 -136.8400      34.1        48       116        60
OIR    2025130    131400  -10.0600 -136.8500      34.0        48       117        60
OIR    2025130    131400  -10.0600 -136.8600      33.7        48       117        60
OIR    2025130    131400  -10.0600 -136.8700      33.2        46       116        60
OIR    2025130    131400  -10.0600 -136.8800      32.8        43       115        60
OIR    2025130    131400  -10.0600 -136.8900      32.9        40       115        60
OIR    2025130    131400  -10.0600 -136.9000      33.0        37       115        60
OIR    2025130    131400  -10.0600 -136.9100      33.0        35       113        60
OIR    2025130    131400  -10.0600 -136.9200      33.2        34       113        60
OIR    2025130    131400  -10.0600 -136.9300      33.4        34       114        60
OIR    2025130    131400  -10.0600 -136.9400      33.5        34       115        60
OIR    2025130    131400  -10.0600 -136.9500      33.6        34       114        60
OIR    2025130    131400  -10.0600 -136.9600      33.8        34       113        60
OIR    2025130    131400  -10.0600 -136.9700      34.2        35       114        60
OIR    2025130    131400  -10.0600 -136.9800      34.4        35       113        60
OIR    2025130    131400  -10.0600 -136.9900      34.5        36       112        60
OIR    2025130    131400  -10.0600 -137.0000      34.7        36       109        60
OIR    2025130    131400  -10.0600 -137.0100      34.8        36       107        60
OIR    2025130    131400  -10.0600 -137.0200      34.8        37       110        60
OIR    2025130    131400  -10.0600 -137.0300      34.6        37       113        60
OIR    2025130    131400  -10.0600 -137.0400      34.3        37       116        60
OIR    2025130    131400  -10.0600 -137.0500      33.9        37       117        60
OIR    2025130    131400  -10.0600 -137.0600      33.0        38       119        60
OIR    2025130    131400  -10.0600 -137.0700      31.8        39       119        60
OIR    2025130    131400  -10.0600 -137.0800      31.1        40       119        60
OIR    2025130    131400  -10.0600 -137.0900      30.9        40       116        60
OIR    2025130    131400  -10.0600 -137.1000      30.7        41       113        60
OIR    2025130    131400  -10.0600 -137.1100      30.7        41       113        60
OIR    2025130    131400  -10.0600 -137.1200      30.8        41       113        60
OIR    2025130    131400  -10.0600 -137.1300      31.0        41       114        60
OIR    2025130    131400  -10.0600 -137.1400      31.2        42       115        60
OIR    2025130    131400  -10.0600 -137.1500      31.5        42       115        60
OIR    2025130    131400  -10.0600 -137.1600      31.9        43       116        60
OIR    2025130    131400  -10.0600 -137.1700      32.1        43       121        60
OIR    2025130    131400  -10.0600 -137.1800      32.5        44       122        60
OIR    2025130    131400  -10.0600 -137.1900      32.9        44       121        60
OIR    2025130    131400  -10.0600 -137.2000      33.5        45       119        60
OIR    2025130    131400  -10.0600 -137.2100      33.9        44       116        60
OIR    2025130    131400  -10.0600 -137.2200      34.4        42       113        60
OIR    2025130    131400  -10.0600 -137.2300      35.0        41       109        60
OIR    2025130    131400  -10.0600 -137.2400      36.2        39       109        60
OIR    2025130    131400  -10.0600 -137.2500      37.0        37       110        60
OIR    2025130    131400  -10.0600 -137.2600      37.3        36       105        60
OIR    2025130    131400  -10.0600 -137.2700      37.5        36       104        60
OIR    2025130    131400  -10.0600 -137.2800      37.5        35       103        60
OIR    2025130    131400  -10.0600 -137.2900      37.4        35       103        60
OIR    2025130    131400  -10.0600 -137.3000      37.4        35       103        60
OIR    2025130    131400  -10.0600 -137.3100      37.3        35       103        60
OIR    2025130    131400  -10.0600 -137.3200      37.3        35       104        60
OIR    2025130    131400  -10.0600 -137.3300      37.1        34       104        60
OIR    2025130    131400  -10.0600 -137.3400      36.9        32       103        60
OIR    2025130    131400  -10.0600 -137.3500      36.7        30       104        60
OIR    2025130    131400  -10.0600 -137.3600      36.7        29       104        60
OIR    2025130    131400  -10.0600 -137.3700      36.5        28       104        60
OIR    2025130    131400  -10.0600 -137.3800      36.4        27       105        60
OIR    2025130    131400  -10.0600 -137.3900      36.1        24       105        60
OIR    2025130    131400  -10.0600 -137.4000      35.8        21       105        60
OIR    2025130    131400  -10.0600 -137.4100      35.1        17       105        60
OIR    2025130    131400  -10.0600 -137.4200      34.7        14       105        60
OIR    2025130    131400  -10.0600 -137.4300      34.6        13       104        60
OIR    2025130    131400  -10.0600 -137.4400      34.6        13       108        60
OIR    2025130    131400  -10.0600 -137.4500      34.7        12       111        60
OIR    2025130    131400  -10.0600 -137.4600      34.9        12       113        60
OIR    2025130    131400  -10.0600 -137.4700      35.0        12       114        60
OIR    2025130    131400  -10.0600 -137.4800      35.2        11       114        60
OIR    2025130    131400  -10.0600 -137.4900      35.3        11       113        60
OIR    2025130    131400  -10.0600 -137.5000      35.3        11       110        60
OIR    2025130    131400  -10.0600 -137.5100      35.3        11       110        60
OIR    2025130    131400  -10.0600 -137.5200      35.4        11       110        60
OIR    2025130    131400  -10.0600 -137.5300      35.4        10       109        60
OIR    2025130    131400  -10.0600 -137.5400      35.5        10       108        60
OIR    2025130    131400  -10.0600 -137.5500      35.5        10       104        60
OIR    2025130    131400  -10.0600 -137.5600      35.4         9       104        60
OIR    2025130    131400  -10.0600 -137.5700      35.3         9       103        60
OIR    2025130    131400  -10.0600 -137.5800      35.3         9       103        60
OIR    2025130    131400  -10.0600 -137.5900      35.2         8       104        60
OIR    2025130    131400  -10.0600 -137.6000      35.2         8       104        60
OIR    2025130    131400  -10.0600 -137.6100      35.1         8       104        60
OIR    2025130    131400  -10.0600 -137.6200      35.0         8       104        60
OIR    2025130    131400  -10.0600 -137.6300      34.9         7       104        60
OIR    2025130    131400  -10.0600 -137.6400      34.9         7       104        60
OIR    2025130    131400  -10.0600 -137.6500      34.8         7       104        60
OIR    2025130    131400  -10.0600 -137.6600      34.8         7       104        60
OIR    2025130    131400  -10.0600 -137.6700      34.8         6       105        60
OIR    2025130    131400  -10.0600 -137.6800      34.7         6       104        60
OIR    2025130    131400  -10.0600 -137.6900      34.7         6       104        60
OIR    2025130    131400  -10.0600 -137.7000      34.7         5       105        60
OIR    2025130    131400  -10.0600 -137.7100      34.7         5       105        60
OIR    2025130    131400  -10.0600 -137.7200      34.7         5       104        60
OIR    2025130    131400  -10.0600 -137.7300      34.7         5       107        60
OIR    2025130    131400  -10.0600 -137.7400      34.6         4       109        60
OIR    2025130    131400  -10.0600 -137.7500      34.4         2       111        60
OIR    2025130    131400  -10.0600 -137.7600      34.1       359       113        60
OIR    2025130    131400  -10.0600 -137.7700      33.5       357       115        60
OIR    2025130    131400  -10.0600 -137.7800      33.0       355       116        60
OIR    2025130    131400  -10.0600 -137.7900      32.7       354       115        60
OIR    2025130    131400  -10.0600 -137.8000      32.5       354       113        60
OIR    2025130    131400  -10.0600 -137.8100      32.4       354       115        60
OIR    2025130    131400  -10.0600 -137.8200      32.3       354       116        60
OIR    2025130    131400  -10.0600 -137.8300      32.3       353       117        60
OIR    2025130    131400  -10.0600 -137.8400      32.2       353       117        60
OIR    2025130    131400  -10.0600 -137.8500      32.1       353       116        60
OIR    2025130    131400  -10.0600 -137.8600      31.8       353       116        60
OIR    2025130    131400  -10.0600 -137.8700      31.6       352       114        60
OIR    2025130    131400  -10.0600 -137.8800      31.5       352       115        60
OIR    2025130    131400  -10.0600 -137.8900      31.4       352       116        60
OIR    2025130    131400  -10.0600 -137.9000      31.4       352       116        60
OIR    2025130    131400  -10.0600 -137.9100      31.3       352       116        60
OIR    2025130    131400  -10.0600 -137.9200      31.2       351       116        60
OIR    2025130    131400  -10.0600 -137.9300      31.0       351       116        60
OIR    2025130    131400  -10.0600 -137.9400      30.8       350       117        60
OIR    2025130    131400  -10.0600 -137.9500      30.5       350       117        60
OIR    2025130    131400  -10.0600 -137.9600      30.3       349       116        60
OIR    2025130    131400  -10.0600 -137.9700      30.1       349       119        60
OIR    2025130    131400  -10.0600 -137.9800      30.0       348       123        60
OIR    2025130    131400  -10.0600 -137.9900      29.8       347       125        60
OIR    2025130    131400  -10.0600 -138.0000      29.6       347       127        60
OIR    2025130    131400  -10.0600 -138.0100      29.4       346       127        60
OIR    2025130    131400  -10.0600 -138.0200      29.2       345       127        60
OIR    2025130    131400  -10.0600 -138.0300      29.0       344       127        60
OIR    2025130    131400  -10.0600 -138.0400      28.9       344       127        60
OIR    2025130    131400  -10.0600 -138.0500      28.8       343       127        60
OIR    2025130    131400  -10.0600 -138.0600      28.7       343       125        60
OIR    2025130    131400  -10.0600 -138.0700      28.7       343       123        60
OIR    2025130    131400  -10.0600 -138.0800      28.6       343       123        60
OIR    2025130    131400  -10.0600 -138.0900      28.6       342       123        60
OIR    2025130    131400  -10.0600 -138.1000      28.5       342       122        60
OIR    2025130    131400  -10.0600 -138.1100      28.5       342       121        60
OIR    2025130    131400  -10.0600 -138.1200      28.4       342       122        60
OIR    2025130    131400  -10.0600 -138.1300      28.3       342       123        60
OIR    2025130    131400  -10.0600 -138.1400      28.3       342       126        60
OIR    2025130    131400  -10.0600 -138.1500      28.3       342       128        60
OIR    2025130    131400  -10.0600 -138.1600      28.2       341       129        60
OIR    2025130    131400  -10.0600 -138.1700      28.2       341       130        60
OIR    2025130    131400  -10.0600 -138.1800      28.2       341       131        60
OIR    2025130    131400  -10.0600 -138.1900      28.2       341       133        60
OIR    2025130    131400  -10.0600 -138.2000      28.1       341       137        60
OIR    2025130    131400  -10.0600 -138.2100      28.1       341       137        60
OIR    2025130    131400  -10.0600 -138.2200      28.1       341       137        60
OIR    2025130    131400  -10.0600 -138.2300      28.0       341       138        60
OIR    2025130    131400  -10.0600 -138.2400      27.9       341       139        60
OIR    2025130    131400  -10.0600 -138.2500      27.9       341       137        60
OIR    2025130    131400  -10.0600 -138.2600      27.7       340       135        60
OIR    2025130    131400  -10.0600 -138.2700      27.7       340       135        60
OIR    2025130    131400  -10.0600 -138.2800      27.6       339       135        60
OIR    2025130    131400  -10.0600 -138.2900      27.6       339       135        60
OIR    2025130    131400  -10.0600 -138.3000      27.6       339       133        60
OIR    2025130    131400  -10.0600 -138.3100      27.6       339       131        60
OIR    2025130    131400  -10.0600 -138.3200      27.6       339       131        60
OIR    2025130    131400  -10.0600 -138.3300      27.6       338       132        60
OIR    2025130    131400  -10.0600 -138.3400      27.5       338       131        60
OIR    2025130    131400  -10.0600 -138.3500      27.4       337       131        60
OIR    2025130    131400  -10.0600 -138.3600      27.3       336       135        60
OIR    2025130    131400  -10.0600 -138.3700      27.1       336       139        60
OIR    2025130    131400  -10.0600 -138.3800      27.0       335       141        60
OIR    2025130    131400  -10.0600 -138.3900      26.8       334       143        60
OIR    2025130    131400  -10.0600 -138.4000      26.6       334       144        60
OIR    2025130    131400  -10.0600 -138.4100      26.6       334       145        60
OIR    2025130    131400  -10.0600 -138.4200      26.7       335       144        60
OIR    2025130    131400  -10.0600 -138.4300      26.8       336       144        60
OIR    2025130    131400  -10.0600 -138.4400      26.8       336       145        60
OIR    2025130    131400  -10.0700 -136.1500      39.9        55       148        60
OIR    2025130    131400  -10.0700 -136.1600      40.0        54       148        60
OIR    2025130    131400  -10.0700 -136.1700      40.1        54       148        60
OIR    2025130    131400  -10.0700 -136.1800      40.3        54       148        60
OIR    2025130    131400  -10.0700 -136.1900      40.3        54       147        60
OIR    2025130    131400  -10.0700 -136.2000      40.4        54       147        60
OIR    2025130    131400  -10.0700 -136.2300      40.4        54       149        60
OIR    2025130    131400  -10.0700 -136.2400      40.4        54       146        60
OIR    2025130    131400  -10.0700 -136.2500      40.4        54       145        60
OIR    2025130    131400  -10.0700 -136.2600      40.4        54       145        60
OIR    2025130    131400  -10.0700 -136.2700      40.5        53       144        60
OIR    2025130    131400  -10.0700 -136.2800      40.5        53       143        60
OIR    2025130    131400  -10.0700 -136.2900      40.5        53       143        60
OIR    2025130    131400  -10.0700 -136.3000      40.5        53       141        60
OIR    2025130    131400  -10.0700 -136.3100      40.5        53       139        60
OIR    2025130    131400  -10.0700 -136.3200      40.5        53       139        60
OIR    2025130    131400  -10.0700 -136.3300      40.4        53       139        60
OIR    2025130    131400  -10.0700 -136.3400      40.4        53       140        60
OIR    2025130    131400  -10.0700 -136.3500      40.3        53       140        60
OIR    2025130    131400  -10.0700 -136.3600      40.2        52       141        60
OIR    2025130    131400  -10.0700 -136.3700      40.1        52       142        60
OIR    2025130    131400  -10.0700 -136.3800      40.1        52       144        60
OIR    2025130    131400  -10.0700 -136.3900      39.9        52       142        60
OIR    2025130    131400  -10.0700 -136.4000      39.7        51       138        60
OIR    2025130    131400  -10.0700 -136.4100      39.4        51       135        60
OIR    2025130    131400  -10.0700 -136.4200      39.2        50       133        60
OIR    2025130    131400  -10.0700 -136.4300      38.8        49       132        60
OIR    2025130    131400  -10.0700 -136.4400      38.5        49       131        60
OIR    2025130    131400  -10.0700 -136.4500      38.4        49       131        60
OIR    2025130    131400  -10.0700 -136.4600      38.2        48       130        60
OIR    2025130    131400  -10.0700 -136.4700      38.2        48       132        60
OIR    2025130    131400  -10.0700 -136.4800      38.1        48       133        60
OIR    2025130    131400  -10.0700 -136.4900      38.1        48       131        60
OIR    2025130    131400  -10.0700 -136.5000      38.1        48       131        60
OIR    2025130    131400  -10.0700 -136.5100      38.2        48       132        60
OIR    2025130    131400  -10.0700 -136.5200      38.1        48       132        60
OIR    2025130    131400  -10.0700 -136.5300      38.1        48       132        60
OIR    2025130    131400  -10.0700 -136.5400      38.2        48       132        60
OIR    2025130    131400  -10.0700 -136.5500      38.2        48       132        60
OIR    2025130    131400  -10.0700 -136.5600      38.1        48       130        60
OIR    2025130    131400  -10.0700 -136.5700      38.1        48       128        60
OIR    2025130    131400  -10.0700 -136.5800      38.1        48       125        60
OIR    2025130    131400  -10.0700 -136.5900      38.1        48       122        60
OIR    2025130    131400  -10.0700 -136.6000      38.1        48       121        60
OIR    2025130    131400  -10.0700 -136.6100      38.1        48       121        60
OIR    2025130    131400  -10.0700 -136.6200      38.1        48       121        60
OIR    2025130    131400  -10.0700 -136.6300      38.0        48       121        60
OIR    2025130    131400  -10.0700 -136.6400      38.0        48       121        60
OIR    2025130    131400  -10.0700 -136.6500      37.7        48       120        60
OIR    2025130    131400  -10.0700 -136.6600      37.4        48       117        60
OIR    2025130    131400  -10.0700 -136.6700      37.1        48       116        60
OIR    2025130    131400  -10.0700 -136.6800      36.9        48       116        60
OIR    2025130    131400  -10.0700 -136.6900      36.8        48       116        60
OIR    2025130    131400  -10.0700 -136.7000      36.7        48       116        60
OIR    2025130    131400  -10.0700 -136.7100      36.5        48       116        60
OIR    2025130    131400  -10.0700 -136.7200      36.4        48       115        60
OIR    2025130    131400  -10.0700 -136.7300      36.3        48       114        60
OIR    2025130    131400  -10.0700 -136.7400      36.0        48       115        60
OIR    2025130    131400  -10.0700 -136.7500      35.7        47       116        60
OIR    2025130    131400  -10.0700 -136.7600      35.5        47       116        60
OIR    2025130    131400  -10.0700 -136.7700      35.4        47       116        60
OIR    2025130    131400  -10.0700 -136.7800      35.2        47       115        60
OIR    2025130    131400  -10.0700 -136.7900      35.0        48       113        60
OIR    2025130    131400  -10.0700 -136.8000      34.8        48       113        60
OIR    2025130    131400  -10.0700 -136.8100      34.7        48       113        60
OIR    2025130    131400  -10.0700 -136.8200      34.6        48       114        60
OIR    2025130    131400  -10.0700 -136.8300      34.6        48       116        60
OIR    2025130    131400  -10.0700 -136.8400      34.5        48       116        60
OIR    2025130    131400  -10.0700 -136.8500      34.4        48       119        60
OIR    2025130    131400  -10.0700 -136.8600      34.2        47       121        60
OIR    2025130    131400  -10.0700 -136.8700      33.1        44       119        60
OIR    2025130    131400  -10.0700 -136.8800      32.8        41       116        60
OIR    2025130    131400  -10.0700 -136.8900      32.9        38       114        60
OIR    2025130    131400  -10.0700 -136.9000      32.9        36       111        60
OIR    2025130    131400  -10.0700 -136.9100      33.1        34       110        60
OIR    2025130    131400  -10.0700 -136.9200      33.2        34       110        60
OIR    2025130    131400  -10.0700 -136.9300      33.3        34       111        60
OIR    2025130    131400  -10.0700 -136.9400      33.5        34       112        60
OIR    2025130    131400  -10.0700 -136.9500      33.7        34       113        60
OIR    2025130    131400  -10.0700 -136.9600      33.9        34       116        60
OIR    2025130    131400  -10.0700 -136.9700      34.3        34       120        60
OIR    2025130    131400  -10.0700 -136.9800      34.5        35       120        60
OIR    2025130    131400  -10.0700 -136.9900      34.5        35       119        60
OIR    2025130    131400  -10.0700 -137.0000      34.6        36       116        60
OIR    2025130    131400  -10.0700 -137.0100      34.7        36       114        60
OIR    2025130    131400  -10.0700 -137.0200      34.7        36       115        60
OIR    2025130    131400  -10.0700 -137.0300      34.5        36       116        60
OIR    2025130    131400  -10.0700 -137.0400      34.3        37       119        60
OIR    2025130    131400  -10.0700 -137.0500      33.9        37       122        60
OIR    2025130    131400  -10.0700 -137.0600      33.2        38       124        60
OIR    2025130    131400  -10.0700 -137.0700      32.1        38       124        60
OIR    2025130    131400  -10.0700 -137.0800      31.3        39       124        60
OIR    2025130    131400  -10.0700 -137.0900      31.0        40       122        60
OIR    2025130    131400  -10.0700 -137.1000      31.0        40       120        60
OIR    2025130    131400  -10.0700 -137.1100      31.0        40       116        60
OIR    2025130    131400  -10.0700 -137.1200      31.1        41       113        60
OIR    2025130    131400  -10.0700 -137.1300      31.4        41       114        60
OIR    2025130    131400  -10.0700 -137.1400      31.7        41       115        60
OIR    2025130    131400  -10.0700 -137.1500      31.9        41       116        60
OIR    2025130    131400  -10.0700 -137.1600      32.5        42       117        60
OIR    2025130    131400  -10.0700 -137.1700      33.1        42       121        60
OIR    2025130    131400  -10.0700 -137.1800      33.9        42       123        60
OIR    2025130    131400  -10.0700 -137.1900      34.5        42       124        60
OIR    2025130    131400  -10.0700 -137.2000      35.1        42       124        60
OIR    2025130    131400  -10.0700 -137.2100      35.8        40       124        60
OIR    2025130    131400  -10.0700 -137.2200      36.5        38       119        60
OIR    2025130    131400  -10.0700 -137.2300      37.1        37       114        60
OIR    2025130    131400  -10.0700 -137.2400      37.3        36       114        60
OIR    2025130    131400  -10.0700 -137.2500      37.6        36       114        60
OIR    2025130    131400  -10.0700 -137.2600      37.7        35       109        60
OIR    2025130    131400  -10.0700 -137.2700      37.7        35       105        60
OIR    2025130    131400  -10.0700 -137.2800      37.7        35       104        60
OIR    2025130    131400  -10.0700 -137.2900      37.6        35       103        60
OIR    2025130    131400  -10.0700 -137.3000      37.6        35       103        60
OIR    2025130    131400  -10.0700 -137.3100      37.5        35       104        60
OIR    2025130    131400  -10.0700 -137.3200      37.4        35       105        60
OIR    2025130    131400  -10.0700 -137.3300      37.3        34       105        60
OIR    2025130    131400  -10.0700 -137.3400      37.1        32       105        60
OIR    2025130    131400  -10.0700 -137.3500      37.0        30       104        60
OIR    2025130    131400  -10.0700 -137.3600      37.0        29       104        60
OIR    2025130    131400  -10.0700 -137.3700      36.8        28       104        60
OIR    2025130    131400  -10.0700 -137.3800      36.3        27       104        60
OIR    2025130    131400  -10.0700 -137.3900      35.9        23       104        60
OIR    2025130    131400  -10.0700 -137.4000      35.3        19       104        60
OIR    2025130    131400  -10.0700 -137.4100      34.7        16       104        60
OIR    2025130    131400  -10.0700 -137.4200      34.4        13       104        60
OIR    2025130    131400  -10.0700 -137.4300      34.4        13       104        60
OIR    2025130    131400  -10.0700 -137.4400      34.5        12       105        60
OIR    2025130    131400  -10.0700 -137.4500      34.5        12       110        60
OIR    2025130    131400  -10.0700 -137.4600      34.7        12       111        60
OIR    2025130    131400  -10.0700 -137.4700      34.8        11       112        60
OIR    2025130    131400  -10.0700 -137.4800      35.0        11       112        60
OIR    2025130    131400  -10.0700 -137.4900      35.1        11       113        60
OIR    2025130    131400  -10.0700 -137.5000      35.2        11       112        60
OIR    2025130    131400  -10.0700 -137.5100      35.1        10       113        60
OIR    2025130    131400  -10.0700 -137.5200      35.1        10       114        60
OIR    2025130    131400  -10.0700 -137.5300      35.1        10       114        60
OIR    2025130    131400  -10.0700 -137.5400      35.2         9       111        60
OIR    2025130    131400  -10.0700 -137.5500      35.2         9       108        60
OIR    2025130    131400  -10.0700 -137.5600      35.3         9       105        60
OIR    2025130    131400  -10.0700 -137.5700      35.3         9       104        60
OIR    2025130    131400  -10.0700 -137.5800      35.2         8       104        60
OIR    2025130    131400  -10.0700 -137.5900      35.2         8       104        60
OIR    2025130    131400  -10.0700 -137.6000      35.1         8       105        60
OIR    2025130    131400  -10.0700 -137.6100      35.0         8       107        60
OIR    2025130    131400  -10.0700 -137.6200      34.9         7       107        60
OIR    2025130    131400  -10.0700 -137.6300      34.9         7       105        60
OIR    2025130    131400  -10.0700 -137.6400      34.9         7       105        60
OIR    2025130    131400  -10.0700 -137.6500      34.8         7       105        60
OIR    2025130    131400  -10.0700 -137.6600      34.8         6       109        60
OIR    2025130    131400  -10.0700 -137.6700      34.8         6       112        60
OIR    2025130    131400  -10.0700 -137.6800      34.7         6       111        60
OIR    2025130    131400  -10.0700 -137.6900      34.7         6       110        60
OIR    2025130    131400  -10.0700 -137.7000      34.7         5       110        60
OIR    2025130    131400  -10.0700 -137.7100      34.7         5       110        60
OIR    2025130    131400  -10.0700 -137.7200      34.6         5       110        60
OIR    2025130    131400  -10.0700 -137.7300      34.6         5       111        60
OIR    2025130    131400  -10.0700 -137.7400      34.5         3       112        60
OIR    2025130    131400  -10.0700 -137.7500      34.3         0       112        60
OIR    2025130    131400  -10.0700 -137.7600      34.0       359       110        60
OIR    2025130    131400  -10.0700 -137.7700      33.4       357       112        60
OIR    2025130    131400  -10.0700 -137.7800      32.9       355       114        60
OIR    2025130    131400  -10.0700 -137.7900      32.6       354       113        60
OIR    2025130    131400  -10.0700 -137.8000      32.4       354       111        60
OIR    2025130    131400  -10.0700 -137.8100      32.3       354       113        60
OIR    2025130    131400  -10.0700 -137.8200      32.3       354       113        60
OIR    2025130    131400  -10.0700 -137.8300      32.2       353       113        60
OIR    2025130    131400  -10.0700 -137.8400      32.1       353       113        60
OIR    2025130    131400  -10.0700 -137.8500      32.0       353       113        60
OIR    2025130    131400  -10.0700 -137.8600      31.8       353       113        60
OIR    2025130    131400  -10.0700 -137.8700      31.6       353       114        60
OIR    2025130    131400  -10.0700 -137.8800      31.4       352       116        60
OIR    2025130    131400  -10.0700 -137.8900      31.4       352       117        60
OIR    2025130    131400  -10.0700 -137.9000      31.3       352       116        60
OIR    2025130    131400  -10.0700 -137.9100      31.2       352       116        60
OIR    2025130    131400  -10.0700 -137.9200      31.1       351       117        60
OIR    2025130    131400  -10.0700 -137.9300      30.9       351       120        60
OIR    2025130    131400  -10.0700 -137.9400      30.6       350       121        60
OIR    2025130    131400  -10.0700 -137.9500      30.4       350       121        60
OIR    2025130    131400  -10.0700 -137.9600      30.1       349       121        60
OIR    2025130    131400  -10.0700 -137.9700      29.9       349       122        60
OIR    2025130    131400  -10.0700 -137.9800      29.8       348       125        60
OIR    2025130    131400  -10.0700 -137.9900      29.5       347       127        60
OIR    2025130    131400  -10.0700 -138.0000      29.3       346       129        60
OIR    2025130    131400  -10.0700 -138.0100      29.2       345       128        60
OIR    2025130    131400  -10.0700 -138.0200      29.0       344       127        60
OIR    2025130    131400  -10.0700 -138.0300      28.9       344       126        60
OIR    2025130    131400  -10.0700 -138.0400      28.7       343       126        60
OIR    2025130    131400  -10.0700 -138.0500      28.7       343       127        60
OIR    2025130    131400  -10.0700 -138.0600      28.6       343       126        60
OIR    2025130    131400  -10.0700 -138.0700      28.6       343       125        60
OIR    2025130    131400  -10.0700 -138.0800      28.5       342       124        60
OIR    2025130    131400  -10.0700 -138.0900      28.5       342       124        60
OIR    2025130    131400  -10.0700 -138.1000      28.4       342       124        60
OIR    2025130    131400  -10.0700 -138.1100      28.4       342       124        60
OIR    2025130    131400  -10.0700 -138.1200      28.3       342       126        60
OIR    2025130    131400  -10.0700 -138.1300      28.3       342       128        60
OIR    2025130    131400  -10.0700 -138.1400      28.3       342       128        60
OIR    2025130    131400  -10.0700 -138.1500      28.2       342       128        60
OIR    2025130    131400  -10.0700 -138.1600      28.2       342       127        60
OIR    2025130    131400  -10.0700 -138.1700      28.2       341       128        60
OIR    2025130    131400  -10.0700 -138.1800      28.2       341       129        60
OIR    2025130    131400  -10.0700 -138.1900      28.1       341       132        60
OIR    2025130    131400  -10.0700 -138.2000      28.1       341       135        60
OIR    2025130    131400  -10.0700 -138.2100      28.1       341       136        60
OIR    2025130    131400  -10.0700 -138.2200      28.1       341       137        60
OIR    2025130    131400  -10.0700 -138.2300      28.0       341       137        60
OIR    2025130    131400  -10.0700 -138.2400      28.0       341       137        60
OIR    2025130    131400  -10.0700 -138.2500      27.9       341       134        60
OIR    2025130    131400  -10.0700 -138.2600      27.8       340       133        60
OIR    2025130    131400  -10.0700 -138.2700      27.7       340       135        60
OIR    2025130    131400  -10.0700 -138.2800      27.6       339       134        60
OIR    2025130    131400  -10.0700 -138.2900      27.6       339       133        60
OIR    2025130    131400  -10.0700 -138.3000      27.6       339       132        60
OIR    2025130    131400  -10.0700 -138.3100      27.6       339       132        60
OIR    2025130    131400  -10.0700 -138.3200      27.6       339       133        60
OIR    2025130    131400  -10.0700 -138.3300      27.6       339       133        60
OIR    2025130    131400  -10.0700 -138.3400      27.6       338       131        60
OIR    2025130    131400  -10.0700 -138.3500      27.6       338       130        60
OIR    2025130    131400  -10.0700 -138.3600      27.6       337       131        60
OIR    2025130    131400  -10.0700 -138.3700      27.6       337       134        60
OIR    2025130    131400  -10.0700 -138.3800      27.5       336       138        60
OIR    2025130    131400  -10.0700 -138.3900      27.3       335       141        60
OIR    2025130    131400  -10.0700 -138.4000      27.0       335       144        60
OIR    2025130    131400  -10.0700 -138.4100      26.9       335       147        60
OIR    2025130    131400  -10.0700 -138.4300      26.9       336       149        60
OIR    2025130    131400  -10.0700 -138.4400      26.9       337       148        60
OIR    2025130    131400  -10.0800 -136.1500      39.9        54       147        60
OIR    2025130    131400  -10.0800 -136.1600      40.0        54       147        60
OIR    2025130    131400  -10.0800 -136.1700      40.1        54       147        60
OIR    2025130    131400  -10.0800 -136.1800      40.2        54       147        60
OIR    2025130    131400  -10.0800 -136.1900      40.3        54       145        60
OIR    2025130    131400  -10.0800 -136.2000      40.3        54       142        60
OIR    2025130    131400  -10.0800 -136.2100      40.4        54       148        60
OIR    2025130    131400  -10.0800 -136.2400      40.4        54       148        60
OIR    2025130    131400  -10.0800 -136.2500      40.4        54       145        60
OIR    2025130    131400  -10.0800 -136.2600      40.5        54       143        60
OIR    2025130    131400  -10.0800 -136.2700      40.5        53       141        60
OIR    2025130    131400  -10.0800 -136.2800      40.6        53       141        60
OIR    2025130    131400  -10.0800 -136.2900      40.6        53       142        60
OIR    2025130    131400  -10.0800 -136.3000      40.6        53       141        60
OIR    2025130    131400  -10.0800 -136.3100      40.6        53       137        60
OIR    2025130    131400  -10.0800 -136.3200      40.5        53       138        60
OIR    2025130    131400  -10.0800 -136.3300      40.5        52       139        60
OIR    2025130    131400  -10.0800 -136.3400      40.4        52       140        60
OIR    2025130    131400  -10.0800 -136.3500      40.4        52       142        60
OIR    2025130    131400  -10.0800 -136.3600      40.3        52       144        60
OIR    2025130    131400  -10.0800 -136.3700      40.3        52       146        60
OIR    2025130    131400  -10.0800 -136.3800      40.2        52       145        60
OIR    2025130    131400  -10.0800 -136.3900      40.1        52       143        60
OIR    2025130    131400  -10.0800 -136.4000      39.8        51       139        60
OIR    2025130    131400  -10.0800 -136.4100      39.5        50       136        60
OIR    2025130    131400  -10.0800 -136.4200      39.3        50       132        60
OIR    2025130    131400  -10.0800 -136.4300      38.8        49       131        60
OIR    2025130    131400  -10.0800 -136.4400      38.5        49       129        60
OIR    2025130    131400  -10.0800 -136.4500      38.3        48       128        60
OIR    2025130    131400  -10.0800 -136.4600      38.2        48       126        60
OIR    2025130    131400  -10.0800 -136.4700      38.2        48       129        60
OIR    2025130    131400  -10.0800 -136.4800      38.2        48       131        60
OIR    2025130    131400  -10.0800 -136.4900      38.1        48       129        60
OIR    2025130    131400  -10.0800 -136.5000      38.2        48       130        60
OIR    2025130    131400  -10.0800 -136.5100      38.2        48       133        60
OIR    2025130    131400  -10.0800 -136.5200      38.2        48       131        60
OIR    2025130    131400  -10.0800 -136.5300      38.2        48       126        60
OIR    2025130    131400  -10.0800 -136.5400      38.2        48       126        60
OIR    2025130    131400  -10.0800 -136.5500      38.2        48       126        60
OIR    2025130    131400  -10.0800 -136.5600      38.2        48       123        60
OIR    2025130    131400  -10.0800 -136.5700      38.2        48       121        60
OIR    2025130    131400  -10.0800 -136.5800      38.1        48       120        60
OIR    2025130    131400  -10.0800 -136.5900      38.2        48       119        60
OIR    2025130    131400  -10.0800 -136.6000      38.2        48       116        60
OIR    2025130    131400  -10.0800 -136.6100      38.1        48       116        60
OIR    2025130    131400  -10.0800 -136.6200      38.1        48       119        60
OIR    2025130    131400  -10.0800 -136.6300      38.1        48       121        60
OIR    2025130    131400  -10.0800 -136.6400      38.0        48       123        60
OIR    2025130    131400  -10.0800 -136.6500      37.9        48       121        60
OIR    2025130    131400  -10.0800 -136.6600      37.6        48       119        60
OIR    2025130    131400  -10.0800 -136.6700      37.4        48       117        60
OIR    2025130    131400  -10.0800 -136.6800      37.2        48       116        60
OIR    2025130    131400  -10.0800 -136.6900      37.0        48       116        60
OIR    2025130    131400  -10.0800 -136.7000      36.9        48       116        60
OIR    2025130    131400  -10.0800 -136.7100      36.8        48       114        60
OIR    2025130    131400  -10.0800 -136.7200      36.7        48       113        60
OIR    2025130    131400  -10.0800 -136.7300      36.6        47       111        60
OIR    2025130    131400  -10.0800 -136.7400      36.4        47       112        60
OIR    2025130    131400  -10.0800 -136.7500      36.3        47       115        60
OIR    2025130    131400  -10.0800 -136.7600      36.2        47       115        60
OIR    2025130    131400  -10.0800 -136.7700      36.1        47       115        60
OIR    2025130    131400  -10.0800 -136.7800      35.9        47       114        60
OIR    2025130    131400  -10.0800 -136.7900      35.8        47       113        60
OIR    2025130    131400  -10.0800 -136.8000      35.7        47       113        60
OIR    2025130    131400  -10.0800 -136.8100      35.5        48       113        60
OIR    2025130    131400  -10.0800 -136.8200      35.4        48       116        60
OIR    2025130    131400  -10.0800 -136.8300      35.2        48       117        60
OIR    2025130    131400  -10.0800 -136.8400      35.0        47       117        60
OIR    2025130    131400  -10.0800 -136.8500      34.9        47       120        60
OIR    2025130    131400  -10.0800 -136.8600      34.8        46       125        60
OIR    2025130    131400  -10.0800 -136.8700      33.6        43       123        60
OIR    2025130    131400  -10.0800 -136.8800      33.4        40       120        60
OIR    2025130    131400  -10.0800 -136.8900      33.5        37       114        60
OIR    2025130    131400  -10.0800 -136.9000      33.2        35       107        60
OIR    2025130    131400  -10.0800 -136.9100      33.1        34       107        60
OIR    2025130    131400  -10.0800 -136.9200      33.2        33       105        60
OIR    2025130    131400  -10.0800 -136.9300      33.4        33       107        60
OIR    2025130    131400  -10.0800 -136.9400      33.8        33       108        60
OIR    2025130    131400  -10.0800 -136.9500      34.1        34       113        60
OIR    2025130    131400  -10.0800 -136.9600      34.6        34       119        60
OIR    2025130    131400  -10.0800 -136.9700      34.9        34       127        60
OIR    2025130    131400  -10.0800 -136.9800      35.0        34       127        60
OIR    2025130    131400  -10.0800 -136.9900      34.7        35       126        60
OIR    2025130    131400  -10.0800 -137.0000      34.6        35       124        60
OIR    2025130    131400  -10.0800 -137.0100      34.6        36       122        60
OIR    2025130    131400  -10.0800 -137.0200      34.6        36       120        60
OIR    2025130    131400  -10.0800 -137.0300      34.3        36       120        60
OIR    2025130    131400  -10.0800 -137.0400      34.2        36       122        60
OIR    2025130    131400  -10.0800 -137.0500      33.9        36       125        60
OIR    2025130    131400  -10.0800 -137.0600      33.3        37       128        60
OIR    2025130    131400  -10.0800 -137.0700      32.4        38       129        60
OIR    2025130    131400  -10.0800 -137.0800      31.5        39       128        60
OIR    2025130    131400  -10.0800 -137.0900      31.2        40       127        60
OIR    2025130    131400  -10.0800 -137.1000      31.1        40       126        60
OIR    2025130    131400  -10.0800 -137.1100      31.1        40       120        60
OIR    2025130    131400  -10.0800 -137.1200      31.4        40       114        60
OIR    2025130    131400  -10.0800 -137.1300      31.8        40       115        60
OIR    2025130    131400  -10.0800 -137.1400      32.3        41       116        60
OIR    2025130    131400  -10.0800 -137.1500      32.5        40       117        60
OIR    2025130    131400  -10.0800 -137.1600      33.3        40       119        60
OIR    2025130    131400  -10.0800 -137.1700      34.3        40       121        60
OIR    2025130    131400  -10.0800 -137.1800      35.3        40       123        60
OIR    2025130    131400  -10.0800 -137.1900      36.0        39       126        60
OIR    2025130    131400  -10.0800 -137.2000      36.6        39       127        60
OIR    2025130    131400  -10.0800 -137.2100      37.2        37       128        60
OIR    2025130    131400  -10.0800 -137.2200      37.5        36       124        60
OIR    2025130    131400  -10.0800 -137.2300      37.6        36       117        60
OIR    2025130    131400  -10.0800 -137.2400      37.6        35       117        60
OIR    2025130    131400  -10.0800 -137.2500      37.7        35       116        60
OIR    2025130    131400  -10.0800 -137.2600      37.8        35       112        60
OIR    2025130    131400  -10.0800 -137.2700      37.7        35       108        60
OIR    2025130    131400  -10.0800 -137.2800      37.7        35       104        60
OIR    2025130    131400  -10.0800 -137.2900      37.7        35       103        60
OIR    2025130    131400  -10.0800 -137.3000      37.6        35       103        60
OIR    2025130    131400  -10.0800 -137.3100      37.6        35       105        60
OIR    2025130    131400  -10.0800 -137.3200      37.5        34       108        60
OIR    2025130    131400  -10.0800 -137.3300      37.5        33       108        60
OIR    2025130    131400  -10.0800 -137.3400      37.4        31       107        60
OIR    2025130    131400  -10.0800 -137.3500      37.3        30       104        60
OIR    2025130    131400  -10.0800 -137.3600      37.2        29       103        60
OIR    2025130    131400  -10.0800 -137.3700      37.0        28       103        60
OIR    2025130    131400  -10.0800 -137.3800      36.1        25       103        60
OIR    2025130    131400  -10.0800 -137.3900      35.5        21       103        60
OIR    2025130    131400  -10.0800 -137.4000      35.1        17       103        60
OIR    2025130    131400  -10.0800 -137.4100      34.6        15       103        60
OIR    2025130    131400  -10.0800 -137.4200      34.3        13       103        60
OIR    2025130    131400  -10.0800 -137.4300      34.2        12       103        60
OIR    2025130    131400  -10.0800 -137.4400      34.3        12       105        60
OIR    2025130    131400  -10.0800 -137.4500      34.3        12       109        60
OIR    2025130    131400  -10.0800 -137.4600      34.4        11       110        60
OIR    2025130    131400  -10.0800 -137.4700      34.5        11       111        60
OIR    2025130    131400  -10.0800 -137.4800      34.6        11       111        60
OIR    2025130    131400  -10.0800 -137.4900      34.8        11       112        60
OIR    2025130    131400  -10.0800 -137.5000      35.0        10       113        60
OIR    2025130    131400  -10.0800 -137.5100      35.0        10       115        60
OIR    2025130    131400  -10.0800 -137.5200      34.9        10       117        60
OIR    2025130    131400  -10.0800 -137.5300      34.8         9       116        60
OIR    2025130    131400  -10.0800 -137.5400      34.9         9       114        60
OIR    2025130    131400  -10.0800 -137.5500      35.0         9       111        60
OIR    2025130    131400  -10.0800 -137.5600      35.1         8       108        60
OIR    2025130    131400  -10.0800 -137.5700      35.1         8       107        60
OIR    2025130    131400  -10.0800 -137.5800      35.2         8       105        60
OIR    2025130    131400  -10.0800 -137.5900      35.1         8       107        60
OIR    2025130    131400  -10.0800 -137.6000      35.0         8       108        60
OIR    2025130    131400  -10.0800 -137.6100      35.0         7       109        60
OIR    2025130    131400  -10.0800 -137.6200      34.9         7       109        60
OIR    2025130    131400  -10.0800 -137.6300      34.9         7       108        60
OIR    2025130    131400  -10.0800 -137.6400      34.9         7       108        60
OIR    2025130    131400  -10.0800 -137.6500      34.8         7       108        60
OIR    2025130    131400  -10.0800 -137.6600      34.8         6       112        60
OIR    2025130    131400  -10.0800 -137.6700      34.8         6       116        60
OIR    2025130    131400  -10.0800 -137.6800      34.7         6       115        60
OIR    2025130    131400  -10.0800 -137.6900      34.7         6       113        60
OIR    2025130    131400  -10.0800 -137.7000      34.6         5       113        60
OIR    2025130    131400  -10.0800 -137.7100      34.6         5       113        60
OIR    2025130    131400  -10.0800 -137.7200      34.6         5       114        60
OIR    2025130    131400  -10.0800 -137.7300      34.5         4       115        60
OIR    2025130    131400  -10.0800 -137.7400      34.4         1       114        60
OIR    2025130    131400  -10.0800 -137.7500      34.0       359       112        60
OIR    2025130    131400  -10.0800 -137.7600      33.7       358       108        60
OIR    2025130    131400  -10.0800 -137.7700      33.2       357       110        60
OIR    2025130    131400  -10.0800 -137.7800      32.7       355       113        60
OIR    2025130    131400  -10.0800 -137.7900      32.4       354       111        60
OIR    2025130    131400  -10.0800 -137.8000      32.3       354       110        60
OIR    2025130    131400  -10.0800 -137.8100      32.3       354       111        60
OIR    2025130    131400  -10.0800 -137.8200      32.2       354       111        60
OIR    2025130    131400  -10.0800 -137.8300      32.2       353       110        60
OIR    2025130    131400  -10.0800 -137.8400      32.1       353       110        60
OIR    2025130    131400  -10.0800 -137.8500      32.0       353       109        60
OIR    2025130    131400  -10.0800 -137.8600      31.7       353       111        60
OIR    2025130    131400  -10.0800 -137.8700      31.5       353       114        60
OIR    2025130    131400  -10.0800 -137.8800      31.3       352       117        60
OIR    2025130    131400  -10.0800 -137.8900      31.2       352       120        60
OIR    2025130    131400  -10.0800 -137.9000      31.1       352       117        60
OIR    2025130    131400  -10.0800 -137.9100      31.0       352       116        60
OIR    2025130    131400  -10.0800 -137.9200      30.9       351       119        60
OIR    2025130    131400  -10.0800 -137.9300      30.7       351       121        60
OIR    2025130    131400  -10.0800 -137.9400      30.4       351       123        60
OIR    2025130    131400  -10.0800 -137.9500      30.1       350       123        60
OIR    2025130    131400  -10.0800 -137.9600      29.9       349       124        60
OIR    2025130    131400  -10.0800 -137.9700      29.7       348       125        60
OIR    2025130    131400  -10.0800 -137.9800      29.5       347       126        60
OIR    2025130    131400  -10.0800 -137.9900      29.3       346       129        60
OIR    2025130    131400  -10.0800 -138.0000      29.1       346       130        60
OIR    2025130    131400  -10.0800 -138.0100      28.9       345       128        60
OIR    2025130    131400  -10.0800 -138.0200      28.8       344       126        60
OIR    2025130    131400  -10.0800 -138.0300      28.7       343       125        60
OIR    2025130    131400  -10.0800 -138.0400      28.6       343       125        60
OIR    2025130    131400  -10.0800 -138.0500      28.6       343       127        60
OIR    2025130    131400  -10.0800 -138.0600      28.5       343       127        60
OIR    2025130    131400  -10.0800 -138.0700      28.5       342       126        60
OIR    2025130    131400  -10.0800 -138.0800      28.4       342       126        60
OIR    2025130    131400  -10.0800 -138.0900      28.4       342       126        60
OIR    2025130    131400  -10.0800 -138.1000      28.3       342       126        60
OIR    2025130    131400  -10.0800 -138.1100      28.3       342       127        60
OIR    2025130    131400  -10.0800 -138.1200      28.3       342       129        60
OIR    2025130    131400  -10.0800 -138.1300      28.3       342       131        60
OIR    2025130    131400  -10.0800 -138.1400      28.2       342       129        60
OIR    2025130    131400  -10.0800 -138.1500      28.2       342       127        60
OIR    2025130    131400  -10.0800 -138.1600      28.2       342       125        60
OIR    2025130    131400  -10.0800 -138.1700      28.2       342       126        60
OIR    2025130    131400  -10.0800 -138.1800      28.2       341       128        60
OIR    2025130    131400  -10.0800 -138.1900      28.1       341       131        60
OIR    2025130    131400  -10.0800 -138.2000      28.1       341       133        60
OIR    2025130    131400  -10.0800 -138.2100      28.1       341       135        60
OIR    2025130    131400  -10.0800 -138.2200      28.1       341       136        60
OIR    2025130    131400  -10.0800 -138.2300      28.0       341       137        60
OIR    2025130    131400  -10.0800 -138.2400      28.0       341       137        60
OIR    2025130    131400  -10.0800 -138.2500      27.9       341       133        60
OIR    2025130    131400  -10.0800 -138.2600      27.8       340       132        60
OIR    2025130    131400  -10.0800 -138.2700      27.7       340       136        60
OIR    2025130    131400  -10.0800 -138.2800      27.6       339       135        60
OIR    2025130    131400  -10.0800 -138.2900      27.6       339       132        60
OIR    2025130    131400  -10.0800 -138.3000      27.6       339       132        60
OIR    2025130    131400  -10.0800 -138.3100      27.6       339       133        60
OIR    2025130    131400  -10.0800 -138.3200      27.6       339       134        60
OIR    2025130    131400  -10.0800 -138.3300      27.6       339       134        60
OIR    2025130    131400  -10.0800 -138.3400      27.6       338       132        60
OIR    2025130    131400  -10.0800 -138.3500      27.7       338       130        60
OIR    2025130    131400  -10.0800 -138.3600      27.7       338       129        60
OIR    2025130    131400  -10.0800 -138.3700      27.7       337       131        60
OIR    2025130    131400  -10.0800 -138.3800      27.7       337       136        60
OIR    2025130    131400  -10.0800 -138.3900      27.6       337       140        60
OIR    2025130    131400  -10.0800 -138.4000      27.4       336       144        60
OIR    2025130    131400  -10.0800 -138.4100      27.2       336       148        60
OIR    2025130    131400  -10.0900 -136.1600      40.1        54       149        60
OIR    2025130    131400  -10.0900 -136.2000      40.3        54       147        60
OIR    2025130    131400  -10.0900 -136.2100      40.3        54       149        60
OIR    2025130    131400  -10.0900 -136.2300      40.4        54       149        60
OIR    2025130    131400  -10.0900 -136.2400      40.4        54       147        60
OIR    2025130    131400  -10.0900 -136.2500      40.5        54       145        60
OIR    2025130    131400  -10.0900 -136.2600      40.5        53       143        60
OIR    2025130    131400  -10.0900 -136.2700      40.6        53       141        60
OIR    2025130    131400  -10.0900 -136.2800      40.6        53       140        60
OIR    2025130    131400  -10.0900 -136.2900      40.7        53       139        60
OIR    2025130    131400  -10.0900 -136.3000      40.7        53       138        60
OIR    2025130    131400  -10.0900 -136.3100      40.7        52       136        60
OIR    2025130    131400  -10.0900 -136.3200      40.6        52       136        60
OIR    2025130    131400  -10.0900 -136.3300      40.6        52       137        60
OIR    2025130    131400  -10.0900 -136.3400      40.5        52       140        60
OIR    2025130    131400  -10.0900 -136.3500      40.5        52       143        60
OIR    2025130    131400  -10.0900 -136.3600      40.5        52       143        60
OIR    2025130    131400  -10.0900 -136.3700      40.4        52       143        60
OIR    2025130    131400  -10.0900 -136.3800      40.4        52       142        60
OIR    2025130    131400  -10.0900 -136.3900      40.3        51       140        60
OIR    2025130    131400  -10.0900 -136.4000      40.1        51       138        60
OIR    2025130    131400  -10.0900 -136.4100      39.7        50       135        60
OIR    2025130    131400  -10.0900 -136.4200      39.4        50       132        60
OIR    2025130    131400  -10.0900 -136.4300      38.8        49       131        60
OIR    2025130    131400  -10.0900 -136.4400      38.6        49       130        60
OIR    2025130    131400  -10.0900 -136.4500      38.4        48       128        60
OIR    2025130    131400  -10.0900 -136.4600      38.3        48       127        60
OIR    2025130    131400  -10.0900 -136.4700      38.2        48       130        60
OIR    2025130    131400  -10.0900 -136.4800      38.2        48       132        60
OIR    2025130    131400  -10.0900 -136.4900      38.1        48       131        60
OIR    2025130    131400  -10.0900 -136.5000      38.1        48       132        60
OIR    2025130    131400  -10.0900 -136.5100      38.1        48       132        60
OIR    2025130    131400  -10.0900 -136.5200      38.2        48       131        60
OIR    2025130    131400  -10.0900 -136.5300      38.2        48       127        60
OIR    2025130    131400  -10.0900 -136.5400      38.2        48       128        60
OIR    2025130    131400  -10.0900 -136.5500      38.2        48       128        60
OIR    2025130    131400  -10.0900 -136.5600      38.2        48       125        60
OIR    2025130    131400  -10.0900 -136.5700      38.2        48       122        60
OIR    2025130    131400  -10.0900 -136.5800      38.2        48       121        60
OIR    2025130    131400  -10.0900 -136.5900      38.2        48       120        60
OIR    2025130    131400  -10.0900 -136.6000      38.2        48       117        60
OIR    2025130    131400  -10.0900 -136.6100      38.2        48       117        60
OIR    2025130    131400  -10.0900 -136.6200      38.1        48       120        60
OIR    2025130    131400  -10.0900 -136.6300      38.1        48       121        60
OIR    2025130    131400  -10.0900 -136.6400      38.1        48       122        60
OIR    2025130    131400  -10.0900 -136.6500      38.0        48       120        60
OIR    2025130    131400  -10.0900 -136.6600      37.8        48       117        60
OIR    2025130    131400  -10.0900 -136.6700      37.6        48       116        60
OIR    2025130    131400  -10.0900 -136.6800      37.3        48       116        60
OIR    2025130    131400  -10.0900 -136.6900      37.2        48       115        60
OIR    2025130    131400  -10.0900 -136.7000      37.1        48       114        60
OIR    2025130    131400  -10.0900 -136.7100      36.9        47       114        60
OIR    2025130    131400  -10.0900 -136.7200      36.8        47       114        60
OIR    2025130    131400  -10.0900 -136.7300      36.7        47       112        60
OIR    2025130    131400  -10.0900 -136.7400      36.6        47       113        60
OIR    2025130    131400  -10.0900 -136.7500      36.5        47       115        60
OIR    2025130    131400  -10.0900 -136.7600      36.4        47       114        60
OIR    2025130    131400  -10.0900 -136.7700      36.4        47       113        60
OIR    2025130    131400  -10.0900 -136.7800      36.3        47       112        60
OIR    2025130    131400  -10.0900 -136.7900      36.3        47       112        60
OIR    2025130    131400  -10.0900 -136.8000      36.2        47       114        60
OIR    2025130    131400  -10.0900 -136.8100      36.1        47       116        60
OIR    2025130    131400  -10.0900 -136.8200      36.0        47       116        60
OIR    2025130    131400  -10.0900 -136.8300      35.7        47       116        60
OIR    2025130    131400  -10.0900 -136.8400      35.5        47       116        60
OIR    2025130    131400  -10.0900 -136.8500      35.4        46       120        60
OIR    2025130    131400  -10.0900 -136.8600      35.3        45       127        60
OIR    2025130    131400  -10.0900 -136.8700      34.4        43       125        60
OIR    2025130    131400  -10.0900 -136.8800      34.0        40       122        60
OIR    2025130    131400  -10.0900 -136.8900      33.8        37       115        60
OIR    2025130    131400  -10.0900 -136.9000      33.8        36       108        60
OIR    2025130    131400  -10.0900 -136.9100      33.1        33       107        60
OIR    2025130    131400  -10.0900 -136.9200      33.2        33       107        60
OIR    2025130    131400  -10.0900 -136.9300      33.5        33       108        60
OIR    2025130    131400  -10.0900 -136.9400      33.9        33       110        60
OIR    2025130    131400  -10.0900 -136.9500      34.4        33       115        60
OIR    2025130    131400  -10.0900 -136.9600      34.9        33       120        60
OIR    2025130    131400  -10.0900 -136.9700      35.4        33       126        60
OIR    2025130    131400  -10.0900 -136.9800      35.6        33       127        60
OIR    2025130    131400  -10.0900 -136.9900      35.4        34       128        60
OIR    2025130    131400  -10.0900 -137.0000      34.8        35       129        60
OIR    2025130    131400  -10.0900 -137.0100      34.7        35       130        60
OIR    2025130    131400  -10.0900 -137.0200      34.5        36       124        60
OIR    2025130    131400  -10.0900 -137.0300      34.2        36       121        60
OIR    2025130    131400  -10.0900 -137.0400      34.1        36       123        60
OIR    2025130    131400  -10.0900 -137.0500      33.9        36       125        60
OIR    2025130    131400  -10.0900 -137.0600      33.4        37       128        60
OIR    2025130    131400  -10.0900 -137.0700      32.6        37       129        60
OIR    2025130    131400  -10.0900 -137.0800      31.9        38       128        60
OIR    2025130    131400  -10.0900 -137.0900      31.4        39       128        60
OIR    2025130    131400  -10.0900 -137.1000      31.2        39       128        60
OIR    2025130    131400  -10.0900 -137.1100      31.3        39       123        60
OIR    2025130    131400  -10.0900 -137.1200      31.7        39       116        60
OIR    2025130    131400  -10.0900 -137.1300      32.4        39       116        60
OIR    2025130    131400  -10.0900 -137.1400      33.0        40       116        60
OIR    2025130    131400  -10.0900 -137.1500      33.3        39       117        60
OIR    2025130    131400  -10.0900 -137.1600      34.2        39       119        60
OIR    2025130    131400  -10.0900 -137.1700      35.2        38       121        60
OIR    2025130    131400  -10.0900 -137.1800      36.1        38       124        60
OIR    2025130    131400  -10.0900 -137.1900      36.7        38       127        60
OIR    2025130    131400  -10.0900 -137.2000      37.2        37       127        60
OIR    2025130    131400  -10.0900 -137.2100      37.6        36       127        60
OIR    2025130    131400  -10.0900 -137.2200      37.7        36       122        60
OIR    2025130    131400  -10.0900 -137.2300      37.7        35       116        60
OIR    2025130    131400  -10.0900 -137.2400      37.8        35       117        60
OIR    2025130    131400  -10.0900 -137.2500      37.8        35       116        60
OIR    2025130    131400  -10.0900 -137.2600      37.8        35       113        60
OIR    2025130    131400  -10.0900 -137.2700      37.8        35       109        60
OIR    2025130    131400  -10.0900 -137.2800      37.7        35       104        60
OIR    2025130    131400  -10.0900 -137.2900      37.7        35       104        60
OIR    2025130    131400  -10.0900 -137.3000      37.7        35       104        60
OIR    2025130    131400  -10.0900 -137.3100      37.6        34       107        60
OIR    2025130    131400  -10.0900 -137.3200      37.6        33       109        60
OIR    2025130    131400  -10.0900 -137.3300      37.7        32       108        60
OIR    2025130    131400  -10.0900 -137.3400      37.7        31       107        60
OIR    2025130    131400  -10.0900 -137.3500      37.5        29       105        60
OIR    2025130    131400  -10.0900 -137.3600      37.3        28       104        60
OIR    2025130    131400  -10.0900 -137.3700      36.9        26       104        60
OIR    2025130    131400  -10.0900 -137.3800      36.1        23       103        60
OIR    2025130    131400  -10.0900 -137.3900      35.3        18       103        60
OIR    2025130    131400  -10.0900 -137.4000      34.9        16       103        60
OIR    2025130    131400  -10.0900 -137.4100      34.5        14       103        60
OIR    2025130    131400  -10.0900 -137.4200      34.2        13       103        60
OIR    2025130    131400  -10.0900 -137.4300      34.1        12       103        60
OIR    2025130    131400  -10.0900 -137.4400      34.1        12       105        60
OIR    2025130    131400  -10.0900 -137.4500      34.1        12       108        60
OIR    2025130    131400  -10.0900 -137.4600      34.1        11       109        60
OIR    2025130    131400  -10.0900 -137.4700      34.1        11       110        60
OIR    2025130    131400  -10.0900 -137.4800      34.3        10       111        60
OIR    2025130    131400  -10.0900 -137.4900      34.4        10       112        60
OIR    2025130    131400  -10.0900 -137.5000      34.5        10       113        60
OIR    2025130    131400  -10.0900 -137.5100      34.7         9       114        60
OIR    2025130    131400  -10.0900 -137.5200      34.6         9       116        60
OIR    2025130    131400  -10.0900 -137.5300      34.6         9       116        60
OIR    2025130    131400  -10.0900 -137.5400      34.6         8       115        60
OIR    2025130    131400  -10.0900 -137.5500      34.8         8       112        60
OIR    2025130    131400  -10.0900 -137.5600      34.9         8       109        60
OIR    2025130    131400  -10.0900 -137.5700      35.0         8       108        60
OIR    2025130    131400  -10.0900 -137.5800      35.1         8       108        60
OIR    2025130    131400  -10.0900 -137.5900      35.1         8       109        60
OIR    2025130    131400  -10.0900 -137.6000      35.0         7       109        60
OIR    2025130    131400  -10.0900 -137.6100      35.0         7       109        60
OIR    2025130    131400  -10.0900 -137.6200      34.9         7       110        60
OIR    2025130    131400  -10.0900 -137.6300      34.9         7       110        60
OIR    2025130    131400  -10.0900 -137.6400      34.8         7       110        60
OIR    2025130    131400  -10.0900 -137.6500      34.8         6       109        60
OIR    2025130    131400  -10.0900 -137.6600      34.8         6       111        60
OIR    2025130    131400  -10.0900 -137.6700      34.7         6       113        60
OIR    2025130    131400  -10.0900 -137.6800      34.7         6       113        60
OIR    2025130    131400  -10.0900 -137.6900      34.6         6       112        60
OIR    2025130    131400  -10.0900 -137.7000      34.6         5       114        60
OIR    2025130    131400  -10.0900 -137.7100      34.6         5       115        60
OIR    2025130    131400  -10.0900 -137.7200      34.6         5       116        60
OIR    2025130    131400  -10.0900 -137.7300      34.5         3       115        60
OIR    2025130    131400  -10.0900 -137.7400      34.0         0       114        60
OIR    2025130    131400  -10.0900 -137.7500      33.6       359       112        60
OIR    2025130    131400  -10.0900 -137.7600      33.4       358       109        60
OIR    2025130    131400  -10.0900 -137.7700      32.9       356       110        60
OIR    2025130    131400  -10.0900 -137.7800      32.5       355       112        60
OIR    2025130    131400  -10.0900 -137.7900      32.3       354       110        60
OIR    2025130    131400  -10.0900 -137.8000      32.2       354       108        60
OIR    2025130    131400  -10.0900 -137.8100      32.2       354       109        60
OIR    2025130    131400  -10.0900 -137.8200      32.2       353       110        60
OIR    2025130    131400  -10.0900 -137.8300      32.1       353       109        60
OIR    2025130    131400  -10.0900 -137.8400      32.0       353       110        60
OIR    2025130    131400  -10.0900 -137.8500      31.8       353       110        60
OIR    2025130    131400  -10.0900 -137.8600      31.5       353       112        60
OIR    2025130    131400  -10.0900 -137.8700      31.2       353       115        60
OIR    2025130    131400  -10.0900 -137.8800      31.0       352       117        60
OIR    2025130    131400  -10.0900 -137.8900      30.8       352       120        60
OIR    2025130    131400  -10.0900 -137.9000      30.7       352       120        60
OIR    2025130    131400  -10.0900 -137.9100      30.7       352       120        60
OIR    2025130    131400  -10.0900 -137.9200      30.6       351       122        60
OIR    2025130    131400  -10.0900 -137.9300      30.4       351       123        60
OIR    2025130    131400  -10.0900 -137.9400      30.1       351       123        60
OIR    2025130    131400  -10.0900 -137.9500      29.8       350       124        60
OIR    2025130    131400  -10.0900 -137.9600      29.6       349       126        60
OIR    2025130    131400  -10.0900 -137.9700      29.4       348       127        60
OIR    2025130    131400  -10.0900 -137.9800      29.3       347       128        60
OIR    2025130    131400  -10.0900 -137.9900      29.1       346       129        60
OIR    2025130    131400  -10.0900 -138.0000      28.9       345       129        60
OIR    2025130    131400  -10.0900 -138.0100      28.7       344       127        60
OIR    2025130    131400  -10.0900 -138.0200      28.6       343       125        60
OIR    2025130    131400  -10.0900 -138.0300      28.5       343       126        60
OIR    2025130    131400  -10.0900 -138.0400      28.5       343       126        60
OIR    2025130    131400  -10.0900 -138.0500      28.5       343       127        60
OIR    2025130    131400  -10.0900 -138.0600      28.4       342       126        60
OIR    2025130    131400  -10.0900 -138.0700      28.4       342       126        60
OIR    2025130    131400  -10.0900 -138.0800      28.3       342       126        60
OIR    2025130    131400  -10.0900 -138.0900      28.3       342       128        60
OIR    2025130    131400  -10.0900 -138.1000      28.3       342       129        60
OIR    2025130    131400  -10.0900 -138.1100      28.3       342       130        60
OIR    2025130    131400  -10.0900 -138.1200      28.3       342       130        60
OIR    2025130    131400  -10.0900 -138.1300      28.2       342       129        60
OIR    2025130    131400  -10.0900 -138.1400      28.2       342       128        60
OIR    2025130    131400  -10.0900 -138.1500      28.2       342       127        60
OIR    2025130    131400  -10.0900 -138.1600      28.2       342       126        60
OIR    2025130    131400  -10.0900 -138.1700      28.2       342       127        60
OIR    2025130    131400  -10.0900 -138.1800      28.1       341       129        60
OIR    2025130    131400  -10.0900 -138.1900      28.1       341       130        60
OIR    2025130    131400  -10.0900 -138.2000      28.1       341       132        60
OIR    2025130    131400  -10.0900 -138.2100      28.1       341       133        60
OIR    2025130    131400  -10.0900 -138.2200      28.1       341       134        60
OIR    2025130    131400  -10.0900 -138.2300      28.0       341       137        60
OIR    2025130    131400  -10.0900 -138.2400      28.0       341       139        60
OIR    2025130    131400  -10.0900 -138.2500      27.9       341       139        60
OIR    2025130    131400  -10.0900 -138.2600      27.9       341       139        60
OIR    2025130    131400  -10.0900 -138.2700      27.7       340       139        60
OIR    2025130    131400  -10.0900 -138.2800      27.6       339       138        60
OIR    2025130    131400  -10.0900 -138.2900      27.6       339       136        60
OIR    2025130    131400  -10.0900 -138.3000      27.6       339       135        60
OIR    2025130    131400  -10.0900 -138.3100      27.6       339       134        60
OIR    2025130    131400  -10.0900 -138.3200      27.6       339       134        60
OIR    2025130    131400  -10.0900 -138.3300      27.7       339       133        60
OIR    2025130    131400  -10.0900 -138.3400      27.7       338       132        60
OIR    2025130    131400  -10.0900 -138.3500      27.7       338       131        60
OIR    2025130    131400  -10.0900 -138.3600      27.7       338       134        60
OIR    2025130    131400  -10.0900 -138.3700      27.7       337       136        60
OIR    2025130    131400  -10.0900 -138.3800      27.7       337       137        60
OIR    2025130    131400  -10.0900 -138.3900      27.7       337       139        60
OIR    2025130    131400  -10.0900 -138.4000      27.6       337       142        60
OIR    2025130    131400  -10.0900 -138.4100      27.4       337       143        60
OIR    2025130    131400  -10.0900 -138.4200      27.3       337       144        60
OIR    2025130    131400  -10.0900 -138.4300      27.2       337       148        60
OIR    2025130    131400  -10.0900 -138.4900      27.2       338       149        60
OIR    2025130    131400  -10.1000 -136.2100      40.3        54       149        60
OIR    2025130    131400  -10.1000 -136.2200      40.4        54       147        60
OIR    2025130    131400  -10.1000 -136.2300      40.4        54       147        60
OIR    2025130    131400  -10.1000 -136.2400      40.4        54       147        60
OIR    2025130    131400  -10.1000 -136.2500      40.5        54       145        60
OIR    2025130    131400  -10.1000 -136.2600      40.6        53       143        60
OIR    2025130    131400  -10.1000 -136.2700      40.6        53       141        60
OIR    2025130    131400  -10.1000 -136.2800      40.7        53       139        60
OIR    2025130    131400  -10.1000 -136.2900      40.8        53       136        60
OIR    2025130    131400  -10.1000 -136.3000      40.8        52       135        60
OIR    2025130    131400  -10.1000 -136.3100      40.7        52       136        60
OIR    2025130    131400  -10.1000 -136.3200      40.7        52       135        60
OIR    2025130    131400  -10.1000 -136.3300      40.7        52       135        60
OIR    2025130    131400  -10.1000 -136.3400      40.6        52       140        60
OIR    2025130    131400  -10.1000 -136.3500      40.6        52       145        60
OIR    2025130    131400  -10.1000 -136.3600      40.6        52       142        60
OIR    2025130    131400  -10.1000 -136.3700      40.7        52       140        60
OIR    2025130    131400  -10.1000 -136.3800      40.8        51       139        60
OIR    2025130    131400  -10.1000 -136.3900      40.8        51       138        60
OIR    2025130    131400  -10.1000 -136.4000      40.6        51       137        60
OIR    2025130    131400  -10.1000 -136.4100      40.1        50       135        60
OIR    2025130    131400  -10.1000 -136.4200      39.6        49       133        60
OIR    2025130    131400  -10.1000 -136.4300      39.0        49       132        60
OIR    2025130    131400  -10.1000 -136.4400      38.6        48       132        60
OIR    2025130    131400  -10.1000 -136.4500      38.4        48       129        60
OIR    2025130    131400  -10.1000 -136.4600      38.3        48       127        60
OIR    2025130    131400  -10.1000 -136.4700      38.3        47       130        60
OIR    2025130    131400  -10.1000 -136.4800      38.3        48       132        60
OIR    2025130    131400  -10.1000 -136.4900      38.1        47       134        60
OIR    2025130    131400  -10.1000 -136.5000      38.1        47       133        60
OIR    2025130    131400  -10.1000 -136.5100      38.1        47       131        60
OIR    2025130    131400  -10.1000 -136.5200      38.2        47       130        60
OIR    2025130    131400  -10.1000 -136.5300      38.2        47       129        60
OIR    2025130    131400  -10.1000 -136.5400      38.2        47       130        60
OIR    2025130    131400  -10.1000 -136.5500      38.3        47       131        60
OIR    2025130    131400  -10.1000 -136.5600      38.3        47       127        60
OIR    2025130    131400  -10.1000 -136.5700      38.2        48       124        60
OIR    2025130    131400  -10.1000 -136.5800      38.2        48       123        60
OIR    2025130    131400  -10.1000 -136.5900      38.2        48       121        60
OIR    2025130    131400  -10.1000 -136.6000      38.2        48       119        60
OIR    2025130    131400  -10.1000 -136.6100      38.2        48       120        60
OIR    2025130    131400  -10.1000 -136.6200      38.2        48       121        60
OIR    2025130    131400  -10.1000 -136.6300      38.2        48       121        60
OIR    2025130    131400  -10.1000 -136.6400      38.1        48       121        60
OIR    2025130    131400  -10.1000 -136.6500      38.1        48       119        60
OIR    2025130    131400  -10.1000 -136.6600      38.0        48       116        60
OIR    2025130    131400  -10.1000 -136.6700      37.8        48       116        60
OIR    2025130    131400  -10.1000 -136.6800      37.5        48       116        60
OIR    2025130    131400  -10.1000 -136.6900      37.3        48       113        60
OIR    2025130    131400  -10.1000 -136.7000      37.2        47       112        60
OIR    2025130    131400  -10.1000 -136.7100      37.0        47       115        60
OIR    2025130    131400  -10.1000 -136.7200      37.0        47       115        60
OIR    2025130    131400  -10.1000 -136.7300      36.9        47       114        60
OIR    2025130    131400  -10.1000 -136.7400      36.8        47       114        60
OIR    2025130    131400  -10.1000 -136.7500      36.7        47       115        60
OIR    2025130    131400  -10.1000 -136.7600      36.6        46       114        60
OIR    2025130    131400  -10.1000 -136.7700      36.6        46       112        60
OIR    2025130    131400  -10.1000 -136.7800      36.6        46       111        60
OIR    2025130    131400  -10.1000 -136.7900      36.5        46       111        60
OIR    2025130    131400  -10.1000 -136.8000      36.5        47       115        60
OIR    2025130    131400  -10.1000 -136.8100      36.4        47       116        60
OIR    2025130    131400  -10.1000 -136.8200      36.3        47       117        60
OIR    2025130    131400  -10.1000 -136.8300      36.1        47       117        60
OIR    2025130    131400  -10.1000 -136.8400      35.9        46       117        60
OIR    2025130    131400  -10.1000 -136.8500      35.8        45       121        60
OIR    2025130    131400  -10.1000 -136.8600      35.9        45       128        60
OIR    2025130    131400  -10.1000 -136.8700      35.7        43       127        60
OIR    2025130    131400  -10.1000 -136.8800      35.3        40       124        60
OIR    2025130    131400  -10.1000 -136.8900      34.3        37       116        60
OIR    2025130    131400  -10.1000 -136.9000      34.1        36       108        60
OIR    2025130    131400  -10.1000 -136.9100      33.4        33       108        60
OIR    2025130    131400  -10.1000 -136.9200      33.4        33       109        60
OIR    2025130    131400  -10.1000 -136.9300      33.9        33       110        60
OIR    2025130    131400  -10.1000 -136.9400      34.4        33       112        60
OIR    2025130    131400  -10.1000 -136.9500      34.9        33       116        60
OIR    2025130    131400  -10.1000 -136.9600      35.3        33       120        60
OIR    2025130    131400  -10.1000 -136.9700      35.6        33       124        60
OIR    2025130    131400  -10.1000 -136.9800      35.7        33       126        60
OIR    2025130    131400  -10.1000 -136.9900      35.8        33       127        60
OIR    2025130    131400  -10.1000 -137.0000      35.7        34       132        60
OIR    2025130    131400  -10.1000 -137.0100      34.9        34       136        60
OIR    2025130    131400  -10.1000 -137.0200      34.5        35       129        60
OIR    2025130    131400  -10.1000 -137.0300      34.3        35       124        60
OIR    2025130    131400  -10.1000 -137.0400      34.3        34       124        60
OIR    2025130    131400  -10.1000 -137.0500      34.3        34       125        60
OIR    2025130    131400  -10.1000 -137.0600      34.1        35       128        60
OIR    2025130    131400  -10.1000 -137.0700      33.9        35       128        60
OIR    2025130    131400  -10.1000 -137.0800      33.0        37       127        60
OIR    2025130    131400  -10.1000 -137.0900      32.3        37       128        60
OIR    2025130    131400  -10.1000 -137.1000      31.7        38       129        60
OIR    2025130    131400  -10.1000 -137.1100      32.1        38       125        60
OIR    2025130    131400  -10.1000 -137.1200      32.7        37       119        60
OIR    2025130    131400  -10.1000 -137.1300      33.5        37       119        60
OIR    2025130    131400  -10.1000 -137.1400      34.3        37       117        60
OIR    2025130    131400  -10.1000 -137.1500      34.4        37       117        60
OIR    2025130    131400  -10.1000 -137.1600      35.2        38       117        60
OIR    2025130    131400  -10.1000 -137.1700      36.0        37       121        60
OIR    2025130    131400  -10.1000 -137.1800      36.7        37       124        60
OIR    2025130    131400  -10.1000 -137.1900      37.2        37       126        60
OIR    2025130    131400  -10.1000 -137.2000      37.5        36       126        60
OIR    2025130    131400  -10.1000 -137.2100      37.6        35       125        60
OIR    2025130    131400  -10.1000 -137.2200      37.7        35       121        60
OIR    2025130    131400  -10.1000 -137.2300      37.8        35       116        60
OIR    2025130    131400  -10.1000 -137.2400      37.8        35       117        60
OIR    2025130    131400  -10.1000 -137.2500      37.8        35       116        60
OIR    2025130    131400  -10.1000 -137.2600      37.8        35       114        60
OIR    2025130    131400  -10.1000 -137.2700      37.8        35       111        60
OIR    2025130    131400  -10.1000 -137.2800      37.8        35       105        60
OIR    2025130    131400  -10.1000 -137.2900      37.7        35       104        60
OIR    2025130    131400  -10.1000 -137.3000      37.7        34       107        60
OIR    2025130    131400  -10.1000 -137.3100      37.6        33       108        60
OIR    2025130    131400  -10.1000 -137.3200      37.6        32       110        60
OIR    2025130    131400  -10.1000 -137.3300      37.7        31       109        60
OIR    2025130    131400  -10.1000 -137.3400      37.9        30       108        60
OIR    2025130    131400  -10.1000 -137.3500      37.9        28       108        60
OIR    2025130    131400  -10.1000 -137.3600      37.3        26       107        60
OIR    2025130    131400  -10.1000 -137.3700      36.5        23       104        60
OIR    2025130    131400  -10.1000 -137.3800      35.9        19       104        60
OIR    2025130    131400  -10.1000 -137.3900      35.2        16       103        60
OIR    2025130    131400  -10.1000 -137.4000      34.8        15       103        60
OIR    2025130    131400  -10.1000 -137.4100      34.5        14       104        60
OIR    2025130    131400  -10.1000 -137.4200      34.2        13       103        60
OIR    2025130    131400  -10.1000 -137.4300      34.0        12       103        60
OIR    2025130    131400  -10.1000 -137.4400      33.9        12       104        60
OIR    2025130    131400  -10.1000 -137.4500      33.9        11       108        60
OIR    2025130    131400  -10.1000 -137.4600      33.9        11       108        60
OIR    2025130    131400  -10.1000 -137.4700      33.9        11       109        60
OIR    2025130    131400  -10.1000 -137.4800      34.0        10       110        60
OIR    2025130    131400  -10.1000 -137.4900      34.1        10       111        60
OIR    2025130    131400  -10.1000 -137.5000      34.3         9       112        60
OIR    2025130    131400  -10.1000 -137.5100      34.4         9       113        60
OIR    2025130    131400  -10.1000 -137.5200      34.4         9       115        60
OIR    2025130    131400  -10.1000 -137.5300      34.4         8       116        60
OIR    2025130    131400  -10.1000 -137.5400      34.5         8       115        60
OIR    2025130    131400  -10.1000 -137.5500      34.7         8       113        60
OIR    2025130    131400  -10.1000 -137.5600      34.9         8       110        60
OIR    2025130    131400  -10.1000 -137.5700      35.0         8       110        60
OIR    2025130    131400  -10.1000 -137.5800      35.1         8       110        60
OIR    2025130    131400  -10.1000 -137.5900      35.1         7       110        60
OIR    2025130    131400  -10.1000 -137.6000      35.0         7       111        60
OIR    2025130    131400  -10.1000 -137.6100      35.0         7       110        60
OIR    2025130    131400  -10.1000 -137.6200      34.9         7       111        60
OIR    2025130    131400  -10.1000 -137.6300      34.9         7       113        60
OIR    2025130    131400  -10.1000 -137.6400      34.9         7       113        60
OIR    2025130    131400  -10.1000 -137.6500      34.9         6       112        60
OIR    2025130    131400  -10.1000 -137.6600      34.8         6       112        60
OIR    2025130    131400  -10.1000 -137.6700      34.7         6       112        60
OIR    2025130    131400  -10.1000 -137.6800      34.6         6       113        60
OIR    2025130    131400  -10.1000 -137.6900      34.6         6       113        60
OIR    2025130    131400  -10.1000 -137.7000      34.6         5       116        60
OIR    2025130    131400  -10.1000 -137.7100      34.6         5       117        60
OIR    2025130    131400  -10.1000 -137.7200      34.5         5       116        60
OIR    2025130    131400  -10.1000 -137.7300      34.2         3       116        60
OIR    2025130    131400  -10.1000 -137.7400      33.5       360       115        60
OIR    2025130    131400  -10.1000 -137.7500      33.2       358       113        60
OIR    2025130    131400  -10.1000 -137.7600      32.9       357       110        60
OIR    2025130    131400  -10.1000 -137.7700      32.5       356       110        60
OIR    2025130    131400  -10.1000 -137.7800      32.3       355       111        60
OIR    2025130    131400  -10.1000 -137.7900      32.2       354       109        60
OIR    2025130    131400  -10.1000 -137.8000      32.1       354       107        60
OIR    2025130    131400  -10.1000 -137.8100      32.1       354       108        60
OIR    2025130    131400  -10.1000 -137.8200      32.1       353       109        60
OIR    2025130    131400  -10.1000 -137.8300      32.0       353       110        60
OIR    2025130    131400  -10.1000 -137.8400      31.9       353       111        60
OIR    2025130    131400  -10.1000 -137.8500      31.6       353       112        60
OIR    2025130    131400  -10.1000 -137.8600      31.2       353       114        60
OIR    2025130    131400  -10.1000 -137.8700      30.9       353       116        60
OIR    2025130    131400  -10.1000 -137.8800      30.7       352       119        60
OIR    2025130    131400  -10.1000 -137.8900      30.5       352       121        60
OIR    2025130    131400  -10.1000 -137.9000      30.4       352       122        60
OIR    2025130    131400  -10.1000 -137.9100      30.3       352       123        60
OIR    2025130    131400  -10.1000 -137.9200      30.2       351       124        60
OIR    2025130    131400  -10.1000 -137.9300      30.0       351       124        60
OIR    2025130    131400  -10.1000 -137.9400      29.7       350       124        60
OIR    2025130    131400  -10.1000 -137.9500      29.4       350       125        60
OIR    2025130    131400  -10.1000 -137.9600      29.3       349       127        60
OIR    2025130    131400  -10.1000 -137.9700      29.2       348       129        60
OIR    2025130    131400  -10.1000 -137.9800      29.1       347       130        60
OIR    2025130    131400  -10.1000 -137.9900      28.9       345       129        60
OIR    2025130    131400  -10.1000 -138.0000      28.7       345       129        60
OIR    2025130    131400  -10.1000 -138.0100      28.6       344       127        60
OIR    2025130    131400  -10.1000 -138.0200      28.5       343       125        60
OIR    2025130    131400  -10.1000 -138.0300      28.4       343       127        60
OIR    2025130    131400  -10.1000 -138.0400      28.4       343       128        60
OIR    2025130    131400  -10.1000 -138.0500      28.4       342       127        60
OIR    2025130    131400  -10.1000 -138.0600      28.4       342       127        60
OIR    2025130    131400  -10.1000 -138.0700      28.3       342       127        60
OIR    2025130    131400  -10.1000 -138.0800      28.3       342       127        60
OIR    2025130    131400  -10.1000 -138.0900      28.3       342       129        60
OIR    2025130    131400  -10.1000 -138.1000      28.3       342       131        60
OIR    2025130    131400  -10.1000 -138.1100      28.3       342       132        60
OIR    2025130    131400  -10.1000 -138.1200      28.2       342       130        60
OIR    2025130    131400  -10.1000 -138.1300      28.2       342       128        60
OIR    2025130    131400  -10.1000 -138.1400      28.2       342       128        60
OIR    2025130    131400  -10.1000 -138.1500      28.2       342       127        60
OIR    2025130    131400  -10.1000 -138.1600      28.2       342       128        60
OIR    2025130    131400  -10.1000 -138.1700      28.1       342       129        60
OIR    2025130    131400  -10.1000 -138.1800      28.1       342       129        60
OIR    2025130    131400  -10.1000 -138.1900      28.1       341       130        60
OIR    2025130    131400  -10.1000 -138.2000      28.1       341       131        60
OIR    2025130    131400  -10.1000 -138.2100      28.1       341       132        60
OIR    2025130    131400  -10.1000 -138.2200      28.0       341       134        60
OIR    2025130    131400  -10.1000 -138.2300      28.0       341       136        60
OIR    2025130    131400  -10.1000 -138.2400      28.0       341       138        60
OIR    2025130    131400  -10.1000 -138.2500      27.9       341       139        60
OIR    2025130    131400  -10.1000 -138.2600      27.9       341       140        60
OIR    2025130    131400  -10.1000 -138.2700      27.7       340       142        60
OIR    2025130    131400  -10.1000 -138.2800      27.6       339       141        60
OIR    2025130    131400  -10.1000 -138.2900      27.6       339       140        60
OIR    2025130    131400  -10.1000 -138.3000      27.6       339       139        60
OIR    2025130    131400  -10.1000 -138.3100      27.6       339       136        60
OIR    2025130    131400  -10.1000 -138.3200      27.6       339       135        60
OIR    2025130    131400  -10.1000 -138.3300      27.7       339       134        60
OIR    2025130    131400  -10.1000 -138.3400      27.7       338       133        60
OIR    2025130    131400  -10.1000 -138.3500      27.7       338       133        60
OIR    2025130    131400  -10.1000 -138.3600      27.7       338       136        60
OIR    2025130    131400  -10.1000 -138.3700      27.7       338       138        60
OIR    2025130    131400  -10.1000 -138.3800      27.7       337       138        60
OIR    2025130    131400  -10.1000 -138.3900      27.7       337       139        60
OIR    2025130    131400  -10.1000 -138.4000      27.6       337       141        60
OIR    2025130    131400  -10.1000 -138.4100      27.5       337       141        60
OIR    2025130    131400  -10.1000 -138.4200      27.4       337       140        60
OIR    2025130    131400  -10.1000 -138.4300      27.4       337       146        60
OIR    2025130    131400  -10.1100 -136.2100      40.3        54       148        60
OIR    2025130    131400  -10.1100 -136.2200      40.4        54       145        60
OIR    2025130    131400  -10.1100 -136.2300      40.4        54       145        60
OIR    2025130    131400  -10.1100 -136.2400      40.5        54       144        60
OIR    2025130    131400  -10.1100 -136.2500      40.6        53       143        60
OIR    2025130    131400  -10.1100 -136.2600      40.7        53       143        60
OIR    2025130    131400  -10.1100 -136.2700      40.7        53       146        60
OIR    2025130    131400  -10.1100 -136.2800      40.8        53       144        60
OIR    2025130    131400  -10.1100 -136.2900      40.9        52       140        60
OIR    2025130    131400  -10.1100 -136.3000      40.9        52       138        60
OIR    2025130    131400  -10.1100 -136.3100      40.9        52       139        60
OIR    2025130    131400  -10.1100 -136.3200      40.8        52       138        60
OIR    2025130    131400  -10.1100 -136.3300      40.8        52       138        60
OIR    2025130    131400  -10.1100 -136.3400      40.9        52       141        60
OIR    2025130    131400  -10.1100 -136.3500      40.9        52       144        60
OIR    2025130    131400  -10.1100 -136.3600      41.1        52       142        60
OIR    2025130    131400  -10.1100 -136.3700      41.3        51       139        60
OIR    2025130    131400  -10.1100 -136.3800      41.5        51       137        60
OIR    2025130    131400  -10.1100 -136.3900      41.5        51       137        60
OIR    2025130    131400  -10.1100 -136.4000      41.3        51       138        60
OIR    2025130    131400  -10.1100 -136.4100      40.7        50       137        60
OIR    2025130    131400  -10.1100 -136.4200      40.0        49       135        60
OIR    2025130    131400  -10.1100 -136.4300      39.3        49       133        60
OIR    2025130    131400  -10.1100 -136.4400      38.7        48       131        60
OIR    2025130    131400  -10.1100 -136.4500      38.4        47       129        60
OIR    2025130    131400  -10.1100 -136.4600      38.3        47       128        60
OIR    2025130    131400  -10.1100 -136.4700      38.3        47       132        60
OIR    2025130    131400  -10.1100 -136.4800      38.3        47       136        60
OIR    2025130    131400  -10.1100 -136.4900      38.1        47       137        60
OIR    2025130    131400  -10.1100 -136.5000      38.2        47       136        60
OIR    2025130    131400  -10.1100 -136.5100      38.2        47       133        60
OIR    2025130    131400  -10.1100 -136.5200      38.2        47       130        60
OIR    2025130    131400  -10.1100 -136.5300      38.3        47       128        60
OIR    2025130    131400  -10.1100 -136.5400      38.3        47       129        60
OIR    2025130    131400  -10.1100 -136.5500      38.3        47       130        60
OIR    2025130    131400  -10.1100 -136.5600      38.3        47       129        60
OIR    2025130    131400  -10.1100 -136.5700      38.3        47       127        60
OIR    2025130    131400  -10.1100 -136.5800      38.3        47       125        60
OIR    2025130    131400  -10.1100 -136.5900      38.3        48       123        60
OIR    2025130    131400  -10.1100 -136.6000      38.2        48       121        60
OIR    2025130    131400  -10.1100 -136.6100      38.2        48       120        60
OIR    2025130    131400  -10.1100 -136.6200      38.2        48       120        60
OIR    2025130    131400  -10.1100 -136.6300      38.2        48       121        60
OIR    2025130    131400  -10.1100 -136.6400      38.2        48       122        60
OIR    2025130    131400  -10.1100 -136.6500      38.1        48       119        60
OIR    2025130    131400  -10.1100 -136.6600      38.1        48       116        60
OIR    2025130    131400  -10.1100 -136.6700      37.9        48       116        60
OIR    2025130    131400  -10.1100 -136.6800      37.7        48       116        60
OIR    2025130    131400  -10.1100 -136.6900      37.5        47       115        60
OIR    2025130    131400  -10.1100 -136.7000      37.3        47       114        60
OIR    2025130    131400  -10.1100 -136.7100      37.2        47       116        60
OIR    2025130    131400  -10.1100 -136.7200      37.1        47       116        60
OIR    2025130    131400  -10.1100 -136.7300      37.0        47       115        60
OIR    2025130    131400  -10.1100 -136.7400      37.0        47       115        60
OIR    2025130    131400  -10.1100 -136.7500      36.9        46       115        60
OIR    2025130    131400  -10.1100 -136.7600      36.8        46       115        60
OIR    2025130    131400  -10.1100 -136.7700      36.8        46       114        60
OIR    2025130    131400  -10.1100 -136.7800      36.7        46       114        60
OIR    2025130    131400  -10.1100 -136.7900      36.7        46       114        60
OIR    2025130    131400  -10.1100 -136.8000      36.7        46       116        60
OIR    2025130    131400  -10.1100 -136.8100      36.6        46       119        60
OIR    2025130    131400  -10.1100 -136.8200      36.6        46       121        60
OIR    2025130    131400  -10.1100 -136.8300      36.4        46       123        60
OIR    2025130    131400  -10.1100 -136.8400      36.4        46       121        60
OIR    2025130    131400  -10.1100 -136.8500      36.4        45       124        60
OIR    2025130    131400  -10.1100 -136.8600      36.5        44       129        60
OIR    2025130    131400  -10.1100 -136.8700      36.2        42       128        60
OIR    2025130    131400  -10.1100 -136.8800      35.9        40       127        60
OIR    2025130    131400  -10.1100 -136.8900      34.8        36       119        60
OIR    2025130    131400  -10.1100 -136.9000      34.6        35       110        60
OIR    2025130    131400  -10.1100 -136.9100      34.2        32       111        60
OIR    2025130    131400  -10.1100 -136.9200      34.6        31       112        60
OIR    2025130    131400  -10.1100 -136.9300      35.1        31       113        60
OIR    2025130    131400  -10.1100 -136.9400      35.3        31       114        60
OIR    2025130    131400  -10.1100 -136.9500      35.5        32       116        60
OIR    2025130    131400  -10.1100 -136.9600      35.7        32       120        60
OIR    2025130    131400  -10.1100 -136.9700      35.8        32       123        60
OIR    2025130    131400  -10.1100 -136.9800      35.9        33       123        60
OIR    2025130    131400  -10.1100 -136.9900      35.9        33       123        60
OIR    2025130    131400  -10.1100 -137.0000      35.9        33       130        60
OIR    2025130    131400  -10.1100 -137.0100      35.4        34       138        60
OIR    2025130    131400  -10.1100 -137.0200      34.8        35       136        60
OIR    2025130    131400  -10.1100 -137.0300      34.5        34       133        60
OIR    2025130    131400  -10.1100 -137.0400      35.2        33       129        60
OIR    2025130    131400  -10.1100 -137.0500      35.0        33       126        60
OIR    2025130    131400  -10.1100 -137.0600      34.7        34       126        60
OIR    2025130    131400  -10.1100 -137.0700      34.5        34       125        60
OIR    2025130    131400  -10.1100 -137.0800      34.1        35       123        60
OIR    2025130    131400  -10.1100 -137.0900      33.7        36       124        60
OIR    2025130    131400  -10.1100 -137.1000      33.3        36       125        60
OIR    2025130    131400  -10.1100 -137.1100      33.6        35       125        60
OIR    2025130    131400  -10.1100 -137.1200      34.3        35       124        60
OIR    2025130    131400  -10.1100 -137.1300      35.0        35       121        60
OIR    2025130    131400  -10.1100 -137.1400      35.4        35       119        60
OIR    2025130    131400  -10.1100 -137.1500      35.5        36       117        60
OIR    2025130    131400  -10.1100 -137.1600      36.2        36       116        60
OIR    2025130    131400  -10.1100 -137.1700      36.9        36       120        60
OIR    2025130    131400  -10.1100 -137.1800      37.4        36       122        60
OIR    2025130    131400  -10.1100 -137.1900      37.6        36       125        60
OIR    2025130    131400  -10.1100 -137.2000      37.7        35       123        60
OIR    2025130    131400  -10.1100 -137.2100      37.8        35       122        60
OIR    2025130    131400  -10.1100 -137.2200      37.8        35       121        60
OIR    2025130    131400  -10.1100 -137.2300      37.8        35       120        60
OIR    2025130    131400  -10.1100 -137.2400      37.8        35       119        60
OIR    2025130    131400  -10.1100 -137.2500      37.8        35       116        60
OIR    2025130    131400  -10.1100 -137.2600      37.8        35       114        60
OIR    2025130    131400  -10.1100 -137.2700      37.8        35       112        60
OIR    2025130    131400  -10.1100 -137.2800      37.8        35       109        60
OIR    2025130    131400  -10.1100 -137.2900      37.7        34       109        60
OIR    2025130    131400  -10.1100 -137.3000      37.7        33       111        60
OIR    2025130    131400  -10.1100 -137.3100      37.6        32       111        60
OIR    2025130    131400  -10.1100 -137.3200      37.7        30       111        60
OIR    2025130    131400  -10.1100 -137.3300      37.7        28       111        60
OIR    2025130    131400  -10.1100 -137.3400      38.1        27       111        60
OIR    2025130    131400  -10.1100 -137.3500      38.1        24       110        60
OIR    2025130    131400  -10.1100 -137.3600      37.3        22       108        60
OIR    2025130    131400  -10.1100 -137.3700      36.5        19       107        60
OIR    2025130    131400  -10.1100 -137.3800      35.8        17       105        60
OIR    2025130    131400  -10.1100 -137.3900      35.2        15       104        60
OIR    2025130    131400  -10.1100 -137.4000      34.7        14       104        60
OIR    2025130    131400  -10.1100 -137.4100      34.4        14       105        60
OIR    2025130    131400  -10.1100 -137.4200      34.3        13       104        60
OIR    2025130    131400  -10.1100 -137.4300      34.0        13       103        60
OIR    2025130    131400  -10.1100 -137.4400      33.9        12       104        60
OIR    2025130    131400  -10.1100 -137.4500      33.7        11       105        60
OIR    2025130    131400  -10.1100 -137.4600      33.7        11       105        60
OIR    2025130    131400  -10.1100 -137.4700      33.7        10       107        60
OIR    2025130    131400  -10.1100 -137.4800      33.8        10       108        60
OIR    2025130    131400  -10.1100 -137.4900      33.9         9       110        60
OIR    2025130    131400  -10.1100 -137.5000      34.0         9       111        60
OIR    2025130    131400  -10.1100 -137.5100      34.1         8       113        60
OIR    2025130    131400  -10.1100 -137.5200      34.2         8       115        60
OIR    2025130    131400  -10.1100 -137.5300      34.3         8       114        60
OIR    2025130    131400  -10.1100 -137.5400      34.4         8       113        60
OIR    2025130    131400  -10.1100 -137.5500      34.5         8       112        60
OIR    2025130    131400  -10.1100 -137.5600      34.7         8       111        60
OIR    2025130    131400  -10.1100 -137.5700      34.9         7       112        60
OIR    2025130    131400  -10.1100 -137.5800      35.0         7       113        60
OIR    2025130    131400  -10.1100 -137.5900      35.0         7       112        60
OIR    2025130    131400  -10.1100 -137.6000      35.0         7       111        60
OIR    2025130    131400  -10.1100 -137.6100      35.0         7       111        60
OIR    2025130    131400  -10.1100 -137.6200      35.0         7       112        60
OIR    2025130    131400  -10.1100 -137.6300      35.0         7       115        60
OIR    2025130    131400  -10.1100 -137.6400      34.9         7       116        60
OIR    2025130    131400  -10.1100 -137.6500      34.9         6       116        60
OIR    2025130    131400  -10.1100 -137.6600      34.8         6       116        60
OIR    2025130    131400  -10.1100 -137.6700      34.7         6       115        60
OIR    2025130    131400  -10.1100 -137.6800      34.6         6       116        60
OIR    2025130    131400  -10.1100 -137.6900      34.6         6       119        60
OIR    2025130    131400  -10.1100 -137.7000      34.5         5       121        60
OIR    2025130    131400  -10.1100 -137.7100      34.4         5       121        60
OIR    2025130    131400  -10.1100 -137.7200      34.3         4       119        60
OIR    2025130    131400  -10.1100 -137.7300      33.9         3       117        60
OIR    2025130    131400  -10.1100 -137.7400      33.1       359       116        60
OIR    2025130    131400  -10.1100 -137.7500      32.7       358       115        60
OIR    2025130    131400  -10.1100 -137.7600      32.4       357       112        60
OIR    2025130    131400  -10.1100 -137.7700      32.1       355       111        60
OIR    2025130    131400  -10.1100 -137.7800      32.0       355       109        60
OIR    2025130    131400  -10.1100 -137.7900      32.0       354       109        60
OIR    2025130    131400  -10.1100 -137.8000      32.0       354       108        60
OIR    2025130    131400  -10.1100 -137.8100      32.0       354       108        60
OIR    2025130    131400  -10.1100 -137.8200      31.9       353       110        60
OIR    2025130    131400  -10.1100 -137.8300      31.8       353       113        60
OIR    2025130    131400  -10.1100 -137.8400      31.7       353       115        60
OIR    2025130    131400  -10.1100 -137.8500      31.3       353       116        60
OIR    2025130    131400  -10.1100 -137.8600      30.9       353       116        60
OIR    2025130    131400  -10.1100 -137.8700      30.3       352       116        60
OIR    2025130    131400  -10.1100 -137.8800      30.1       352       119        60
OIR    2025130    131400  -10.1100 -137.8900      30.0       352       122        60
OIR    2025130    131400  -10.1100 -137.9000      29.9       352       123        60
OIR    2025130    131400  -10.1100 -137.9100      29.8       352       125        60
OIR    2025130    131400  -10.1100 -137.9200      29.7       352       126        60
OIR    2025130    131400  -10.1100 -137.9300      29.4       351       127        60
OIR    2025130    131400  -10.1100 -137.9400      29.2       350       128        60
OIR    2025130    131400  -10.1100 -137.9500      29.1       349       129        60
OIR    2025130    131400  -10.1100 -137.9600      29.1       349       130        60
OIR    2025130    131400  -10.1100 -137.9700      29.0       348       131        60
OIR    2025130    131400  -10.1100 -137.9800      28.8       346       133        60
OIR    2025130    131400  -10.1100 -137.9900      28.7       345       132        60
OIR    2025130    131400  -10.1100 -138.0000      28.5       344       130        60
OIR    2025130    131400  -10.1100 -138.0100      28.4       344       129        60
OIR    2025130    131400  -10.1100 -138.0200      28.4       343       128        60
OIR    2025130    131400  -10.1100 -138.0300      28.4       343       128        60
OIR    2025130    131400  -10.1100 -138.0400      28.3       343       128        60
OIR    2025130    131400  -10.1100 -138.0500      28.3       342       128        60
OIR    2025130    131400  -10.1100 -138.0600      28.3       342       128        60
OIR    2025130    131400  -10.1100 -138.0700      28.3       342       128        60
OIR    2025130    131400  -10.1100 -138.0800      28.3       342       129        60
OIR    2025130    131400  -10.1100 -138.0900      28.3       342       130        60
OIR    2025130    131400  -10.1100 -138.1000      28.3       342       132        60
OIR    2025130    131400  -10.1100 -138.1100      28.2       342       132        60
OIR    2025130    131400  -10.1100 -138.1200      28.2       342       130        60
OIR    2025130    131400  -10.1100 -138.1300      28.2       342       128        60
OIR    2025130    131400  -10.1100 -138.1400      28.2       342       127        60
OIR    2025130    131400  -10.1100 -138.1500      28.2       342       127        60
OIR    2025130    131400  -10.1100 -138.1600      28.1       342       130        60
OIR    2025130    131400  -10.1100 -138.1700      28.1       342       130        60
OIR    2025130    131400  -10.1100 -138.1800      28.1       342       130        60
OIR    2025130    131400  -10.1100 -138.1900      28.1       341       130        60
OIR    2025130    131400  -10.1100 -138.2000      28.1       341       131        60
OIR    2025130    131400  -10.1100 -138.2100      28.1       341       132        60
OIR    2025130    131400  -10.1100 -138.2200      28.0       341       133        60
OIR    2025130    131400  -10.1100 -138.2300      28.0       341       134        60
OIR    2025130    131400  -10.1100 -138.2400      28.0       341       135        60
OIR    2025130    131400  -10.1100 -138.2500      27.9       341       136        60
OIR    2025130    131400  -10.1100 -138.2600      27.8       340       139        60
OIR    2025130    131400  -10.1100 -138.2700      27.7       340       143        60
OIR    2025130    131400  -10.1100 -138.2800      27.6       339       144        60
OIR    2025130    131400  -10.1100 -138.2900      27.6       339       145        60
OIR    2025130    131400  -10.1100 -138.3000      27.6       339       143        60
OIR    2025130    131400  -10.1100 -138.3100      27.6       339       139        60
OIR    2025130    131400  -10.1100 -138.3200      27.6       339       137        60
OIR    2025130    131400  -10.1100 -138.3300      27.7       339       135        60
OIR    2025130    131400  -10.1100 -138.3400      27.7       338       135        60
OIR    2025130    131400  -10.1100 -138.3500      27.7       338       134        60
OIR    2025130    131400  -10.1100 -138.3600      27.7       338       137        60
OIR    2025130    131400  -10.1100 -138.3700      27.7       338       139        60
OIR    2025130    131400  -10.1100 -138.3800      27.7       338       139        60
OIR    2025130    131400  -10.1100 -138.3900      27.7       337       139        60
OIR    2025130    131400  -10.1100 -138.4000      27.6       337       139        60
OIR    2025130    131400  -10.1100 -138.4100      27.5       337       139        60
OIR    2025130    131400  -10.1100 -138.4200      27.5       337       139        60
OIR    2025130    131400  -10.1100 -138.4300      27.5       337       144        60
OIR    2025130    131400  -10.1100 -138.4400      27.4       337       149        60
OIR    2025130    131400  -10.1200 -136.2000      40.3        54       149        60
OIR    2025130    131400  -10.1200 -136.2100      40.3        54       146        60
OIR    2025130    131400  -10.1200 -136.2200      40.4        54       143        60
OIR    2025130    131400  -10.1200 -136.2300      40.4        54       143        60
OIR    2025130    131400  -10.1200 -136.2400      40.5        53       142        60
OIR    2025130    131400  -10.1200 -136.2500      40.6        53       142        60
OIR    2025130    131400  -10.1200 -136.2600      40.8        53       144        60
OIR    2025130    131400  -10.1200 -136.2900      41.2        52       143        60
OIR    2025130    131400  -10.1200 -136.3000      41.2        52       141        60
OIR    2025130    131400  -10.1200 -136.3100      41.4        52       143        60
OIR    2025130    131400  -10.1200 -136.3200      41.4        51       141        60
OIR    2025130    131400  -10.1200 -136.3300      41.5        51       140        60
OIR    2025130    131400  -10.1200 -136.3400      41.7        51       142        60
OIR    2025130    131400  -10.1200 -136.3500      41.7        51       143        60
OIR    2025130    131400  -10.1200 -136.3600      41.9        51       141        60
OIR    2025130    131400  -10.1200 -136.3700      42.0        51       138        60
OIR    2025130    131400  -10.1200 -136.3800      42.1        51       135        60
OIR    2025130    131400  -10.1200 -136.3900      42.0        51       136        60
OIR    2025130    131400  -10.1200 -136.4000      41.9        51       139        60
OIR    2025130    131400  -10.1200 -136.4100      41.6        50       139        60
OIR    2025130    131400  -10.1200 -136.4200      40.9        50       136        60
OIR    2025130    131400  -10.1200 -136.4300      39.8        49       134        60
OIR    2025130    131400  -10.1200 -136.4400      38.8        48       131        60
OIR    2025130    131400  -10.1200 -136.4500      38.5        47       130        60
OIR    2025130    131400  -10.1200 -136.4600      38.4        47       128        60
OIR    2025130    131400  -10.1200 -136.4700      38.3        47       134        60
OIR    2025130    131400  -10.1200 -136.4800      38.2        47       138        60
OIR    2025130    131400  -10.1200 -136.4900      38.1        47       139        60
OIR    2025130    131400  -10.1200 -136.5000      38.2        47       136        60
OIR    2025130    131400  -10.1200 -136.5100      38.2        47       133        60
OIR    2025130    131400  -10.1200 -136.5200      38.2        47       130        60
OIR    2025130    131400  -10.1200 -136.5300      38.3        47       128        60
OIR    2025130    131400  -10.1200 -136.5400      38.3        47       128        60
OIR    2025130    131400  -10.1200 -136.5500      38.4        47       129        60
OIR    2025130    131400  -10.1200 -136.5600      38.4        47       129        60
OIR    2025130    131400  -10.1200 -136.5700      38.4        47       129        60
OIR    2025130    131400  -10.1200 -136.5800      38.3        47       127        60
OIR    2025130    131400  -10.1200 -136.5900      38.3        47       125        60
OIR    2025130    131400  -10.1200 -136.6000      38.3        48       122        60
OIR    2025130    131400  -10.1200 -136.6100      38.3        48       121        60
OIR    2025130    131400  -10.1200 -136.6200      38.2        48       121        60
OIR    2025130    131400  -10.1200 -136.6300      38.2        48       122        60
OIR    2025130    131400  -10.1200 -136.6400      38.2        48       123        60
OIR    2025130    131400  -10.1200 -136.6500      38.2        48       120        60
OIR    2025130    131400  -10.1200 -136.6600      38.2        48       116        60
OIR    2025130    131400  -10.1200 -136.6700      38.1        48       116        60
OIR    2025130    131400  -10.1200 -136.6800      37.9        47       116        60
OIR    2025130    131400  -10.1200 -136.6900      37.7        47       116        60
OIR    2025130    131400  -10.1200 -136.7000      37.5        47       116        60
OIR    2025130    131400  -10.1200 -136.7100      37.4        47       116        60
OIR    2025130    131400  -10.1200 -136.7200      37.3        46       116        60
OIR    2025130    131400  -10.1200 -136.7300      37.3        46       116        60
OIR    2025130    131400  -10.1200 -136.7400      37.2        46       116        60
OIR    2025130    131400  -10.1200 -136.7500      37.1        46       115        60
OIR    2025130    131400  -10.1200 -136.7600      37.1        46       115        60
OIR    2025130    131400  -10.1200 -136.7700      37.1        46       115        60
OIR    2025130    131400  -10.1200 -136.7800      37.1        46       115        60
OIR    2025130    131400  -10.1200 -136.7900      37.0        46       115        60
OIR    2025130    131400  -10.1200 -136.8000      37.0        46       116        60
OIR    2025130    131400  -10.1200 -136.8100      36.9        46       119        60
OIR    2025130    131400  -10.1200 -136.8200      36.9        45       123        60
OIR    2025130    131400  -10.1200 -136.8300      37.0        45       125        60
OIR    2025130    131400  -10.1200 -136.8400      37.1        44       123        60
OIR    2025130    131400  -10.1200 -136.8500      37.0        44       125        60
OIR    2025130    131400  -10.1200 -136.8600      36.9        43       129        60
OIR    2025130    131400  -10.1200 -136.8700      36.6        41       129        60
OIR    2025130    131400  -10.1200 -136.8800      36.2        38       128        60
OIR    2025130    131400  -10.1200 -136.8900      35.6        34       121        60
OIR    2025130    131400  -10.1200 -136.9000      35.5        33       113        60
OIR    2025130    131400  -10.1200 -136.9100      35.7        31       113        60
OIR    2025130    131400  -10.1200 -136.9200      35.9        30       113        60
OIR    2025130    131400  -10.1200 -136.9300      36.0        30       113        60
OIR    2025130    131400  -10.1200 -136.9400      36.1        31       114        60
OIR    2025130    131400  -10.1200 -136.9500      36.1        31       116        60
OIR    2025130    131400  -10.1200 -136.9600      36.1        31       119        60
OIR    2025130    131400  -10.1200 -136.9700      36.1        32       122        60
OIR    2025130    131400  -10.1200 -136.9800      36.1        32       122        60
OIR    2025130    131400  -10.1200 -136.9900      36.1        33       122        60
OIR    2025130    131400  -10.1200 -137.0000      36.0        33       129        60
OIR    2025130    131400  -10.1200 -137.0100      35.8        33       137        60
OIR    2025130    131400  -10.1200 -137.0200      35.4        34       137        60
OIR    2025130    131400  -10.1200 -137.0300      35.5        33       135        60
OIR    2025130    131400  -10.1200 -137.0400      35.8        32       129        60
OIR    2025130    131400  -10.1200 -137.0500      35.6        32       124        60
OIR    2025130    131400  -10.1200 -137.0600      35.3        33       122        60
OIR    2025130    131400  -10.1200 -137.0700      35.0        34       121        60
OIR    2025130    131400  -10.1200 -137.0800      34.9        34       119        60
OIR    2025130    131400  -10.1200 -137.0900      34.9        34       121        60
OIR    2025130    131400  -10.1200 -137.1000      35.1        34       122        60
OIR    2025130    131400  -10.1200 -137.1100      35.3        34       124        60
OIR    2025130    131400  -10.1200 -137.1200      35.5        34       125        60
OIR    2025130    131400  -10.1200 -137.1300      35.8        34       123        60
OIR    2025130    131400  -10.1200 -137.1400      36.0        34       120        60
OIR    2025130    131400  -10.1200 -137.1500      36.3        35       117        60
OIR    2025130    131400  -10.1200 -137.1600      37.0        35       116        60
OIR    2025130    131400  -10.1200 -137.1700      37.6        35       119        60
OIR    2025130    131400  -10.1200 -137.1800      37.9        35       121        60
OIR    2025130    131400  -10.1200 -137.1900      38.0        35       123        60
OIR    2025130    131400  -10.1200 -137.2000      38.0        35       121        60
OIR    2025130    131400  -10.1200 -137.2100      37.9        35       119        60
OIR    2025130    131400  -10.1200 -137.2200      37.9        35       120        60
OIR    2025130    131400  -10.1200 -137.2300      37.8        35       121        60
OIR    2025130    131400  -10.1200 -137.2400      37.8        35       119        60
OIR    2025130    131400  -10.1200 -137.2500      37.8        35       116        60
OIR    2025130    131400  -10.1200 -137.2600      37.8        34       115        60
OIR    2025130    131400  -10.1200 -137.2700      37.9        34       112        60
OIR    2025130    131400  -10.1200 -137.2800      37.7        33       111        60
OIR    2025130    131400  -10.1200 -137.2900      37.5        30       112        60
OIR    2025130    131400  -10.1200 -137.3000      37.5        27       114        60
OIR    2025130    131400  -10.1200 -137.3100      37.9        24       112        60
OIR    2025130    131400  -10.1200 -137.3200      38.3        22       110        60
OIR    2025130    131400  -10.1200 -137.3300      38.2        20       110        60
OIR    2025130    131400  -10.1200 -137.3400      38.4        21       111        60
OIR    2025130    131400  -10.1200 -137.3500      38.3        20       109        60
OIR    2025130    131400  -10.1200 -137.3600      37.4        18       108        60
OIR    2025130    131400  -10.1200 -137.3700      36.5        17       108        60
OIR    2025130    131400  -10.1200 -137.3800      35.8        16       107        60
OIR    2025130    131400  -10.1200 -137.3900      35.2        15       104        60
OIR    2025130    131400  -10.1200 -137.4000      34.7        14       104        60
OIR    2025130    131400  -10.1200 -137.4100      34.5        13       105        60
OIR    2025130    131400  -10.1200 -137.4200      34.3        13       104        60
OIR    2025130    131400  -10.1200 -137.4300      34.1        13       104        60
OIR    2025130    131400  -10.1200 -137.4400      33.9        12       104        60
OIR    2025130    131400  -10.1200 -137.4500      33.7        11       104        60
OIR    2025130    131400  -10.1200 -137.4600      33.6        11       104        60
OIR    2025130    131400  -10.1200 -137.4700      33.5        10       104        60
OIR    2025130    131400  -10.1200 -137.4800      33.6        10       107        60
OIR    2025130    131400  -10.1200 -137.4900      33.7         9       108        60
OIR    2025130    131400  -10.1200 -137.5000      33.8         9       109        60
OIR    2025130    131400  -10.1200 -137.5100      33.9         8       111        60
OIR    2025130    131400  -10.1200 -137.5200      34.0         8       114        60
OIR    2025130    131400  -10.1200 -137.5300      34.1         8       113        60
OIR    2025130    131400  -10.1200 -137.5400      34.2         8       112        60
OIR    2025130    131400  -10.1200 -137.5500      34.3         7       112        60
OIR    2025130    131400  -10.1200 -137.5600      34.5         7       112        60
OIR    2025130    131400  -10.1200 -137.5700      34.8         7       112        60
OIR    2025130    131400  -10.1200 -137.5800      34.9         7       112        60
OIR    2025130    131400  -10.1200 -137.5900      35.0         7       111        60
OIR    2025130    131400  -10.1200 -137.6000      35.0         7       110        60
OIR    2025130    131400  -10.1200 -137.6100      35.0         7       111        60
OIR    2025130    131400  -10.1200 -137.6200      35.0         7       112        60
OIR    2025130    131400  -10.1200 -137.6300      35.0         7       115        60
OIR    2025130    131400  -10.1200 -137.6400      35.0         7       116        60
OIR    2025130    131400  -10.1200 -137.6500      34.9         6       117        60
OIR    2025130    131400  -10.1200 -137.6600      34.8         6       116        60
OIR    2025130    131400  -10.1200 -137.6700      34.7         6       116        60
OIR    2025130    131400  -10.1200 -137.6800      34.6         6       117        60
OIR    2025130    131400  -10.1200 -137.6900      34.5         6       120        60
OIR    2025130    131400  -10.1200 -137.7000      34.4         5       121        60
OIR    2025130    131400  -10.1200 -137.7100      34.2         5       121        60
OIR    2025130    131400  -10.1200 -137.7200      34.0         4       117        60
OIR    2025130    131400  -10.1200 -137.7300      33.5         2       116        60
OIR    2025130    131400  -10.1200 -137.7400      32.7       359       116        60
OIR    2025130    131400  -10.1200 -137.7500      32.2       357       116        60
OIR    2025130    131400  -10.1200 -137.7600      32.0       356       113        60
OIR    2025130    131400  -10.1200 -137.7700      31.8       355       110        60
OIR    2025130    131400  -10.1200 -137.7800      31.8       354       108        60
OIR    2025130    131400  -10.1200 -137.7900      31.8       354       109        60
OIR    2025130    131400  -10.1200 -137.8000      31.8       354       109        60
OIR    2025130    131400  -10.1200 -137.8100      31.8       354       110        60
OIR    2025130    131400  -10.1200 -137.8200      31.7       353       111        60
OIR    2025130    131400  -10.1200 -137.8300      31.6       353       115        60
OIR    2025130    131400  -10.1200 -137.8400      31.3       353       116        60
OIR    2025130    131400  -10.1200 -137.8500      30.9       353       117        60
OIR    2025130    131400  -10.1200 -137.8600      30.2       353       119        60
OIR    2025130    131400  -10.1200 -137.8700      29.5       352       120        60
OIR    2025130    131400  -10.1200 -137.8800      29.2       352       122        60
OIR    2025130    131400  -10.1200 -137.8900      29.1       352       124        60
OIR    2025130    131400  -10.1200 -137.9000      29.0       352       126        60
OIR    2025130    131400  -10.1200 -137.9100      29.0       352       128        60
OIR    2025130    131400  -10.1200 -137.9200      28.9       351       128        60
OIR    2025130    131400  -10.1200 -137.9300      28.7       351       129        60
OIR    2025130    131400  -10.1200 -137.9400      28.6       350       131        60
OIR    2025130    131400  -10.1200 -137.9500      28.6       349       132        60
OIR    2025130    131400  -10.1200 -137.9600      28.7       349       133        60
OIR    2025130    131400  -10.1200 -137.9700      28.8       347       135        60
OIR    2025130    131400  -10.1200 -137.9800      28.6       346       136        60
OIR    2025130    131400  -10.1200 -137.9900      28.5       345       134        60
OIR    2025130    131400  -10.1200 -138.0000      28.4       344       132        60
OIR    2025130    131400  -10.1200 -138.0100      28.3       343       131        60
OIR    2025130    131400  -10.1200 -138.0200      28.3       343       131        60
OIR    2025130    131400  -10.1200 -138.0300      28.3       343       130        60
OIR    2025130    131400  -10.1200 -138.0400      28.3       342       130        60
OIR    2025130    131400  -10.1200 -138.0500      28.3       342       130        60
OIR    2025130    131400  -10.1200 -138.0600      28.3       342       129        60
OIR    2025130    131400  -10.1200 -138.0700      28.3       342       129        60
OIR    2025130    131400  -10.1200 -138.0800      28.3       342       130        60
OIR    2025130    131400  -10.1200 -138.0900      28.3       342       131        60
OIR    2025130    131400  -10.1200 -138.1000      28.2       342       132        60
OIR    2025130    131400  -10.1200 -138.1100      28.2       342       132        60
OIR    2025130    131400  -10.1200 -138.1200      28.2       342       130        60
OIR    2025130    131400  -10.1200 -138.1300      28.2       342       128        60
OIR    2025130    131400  -10.1200 -138.1400      28.1       342       128        60
OIR    2025130    131400  -10.1200 -138.1500      28.1       342       129        60
OIR    2025130    131400  -10.1200 -138.1600      28.1       342       131        60
OIR    2025130    131400  -10.1200 -138.1700      28.1       342       131        60
OIR    2025130    131400  -10.1200 -138.1800      28.1       342       131        60
OIR    2025130    131400  -10.1200 -138.1900      28.1       341       131        60
OIR    2025130    131400  -10.1200 -138.2000      28.1       341       131        60
OIR    2025130    131400  -10.1200 -138.2100      28.0       341       133        60
OIR    2025130    131400  -10.1200 -138.2200      28.0       341       134        60
OIR    2025130    131400  -10.1200 -138.2300      28.0       341       134        60
OIR    2025130    131400  -10.1200 -138.2400      28.0       341       134        60
OIR    2025130    131400  -10.1200 -138.2500      27.9       341       134        60
OIR    2025130    131400  -10.1200 -138.2600      27.7       340       137        60
OIR    2025130    131400  -10.1200 -138.2700      27.7       339       142        60
OIR    2025130    131400  -10.1200 -138.2800      27.6       339       145        60
OIR    2025130    131400  -10.1200 -138.2900      27.6       339       147        60
OIR    2025130    131400  -10.1200 -138.3000      27.6       339       146        60
OIR    2025130    131400  -10.1200 -138.3100      27.6       339       141        60
OIR    2025130    131400  -10.1200 -138.3200      27.6       339       139        60
OIR    2025130    131400  -10.1200 -138.3300      27.7       339       137        60
OIR    2025130    131400  -10.1200 -138.3400      27.7       338       137        60
OIR    2025130    131400  -10.1200 -138.3500      27.7       338       137        60
OIR    2025130    131400  -10.1200 -138.3600      27.7       338       138        60
OIR    2025130    131400  -10.1200 -138.3700      27.7       338       139        60
OIR    2025130    131400  -10.1200 -138.3800      27.7       338       139        60
OIR    2025130    131400  -10.1200 -138.3900      27.7       338       139        60
OIR    2025130    131400  -10.1200 -138.4000      27.6       338       139        60
OIR    2025130    131400  -10.1200 -138.4100      27.6       337       139        60
OIR    2025130    131400  -10.1200 -138.4200      27.6       337       139        60
OIR    2025130    131400  -10.1200 -138.4300      27.6       337       144        60
OIR    2025130    131400  -10.1200 -138.4400      27.6       337       149        60
OIR    2025130    131400  -10.1300 -136.1900      40.3        54       148        60
OIR    2025130    131400  -10.1300 -136.2000      40.3        54       146        60
OIR    2025130    131400  -10.1300 -136.2100      40.4        54       144        60
OIR    2025130    131400  -10.1300 -136.2200      40.4        54       142        60
OIR    2025130    131400  -10.1300 -136.2300      40.5        54       142        60
OIR    2025130    131400  -10.1300 -136.2400      40.6        53       143        60
OIR    2025130    131400  -10.1300 -136.2500      40.7        53       144        60
OIR    2025130    131400  -10.1300 -136.2600      40.9        53       146        60
OIR    2025130    131400  -10.1300 -136.2900      41.9        51       147        60
OIR    2025130    131400  -10.1300 -136.3000      42.0        51       145        60
OIR    2025130    131400  -10.1300 -136.3100      42.1        51       144        60
OIR    2025130    131400  -10.1300 -136.3200      42.1        51       140        60
OIR    2025130    131400  -10.1300 -136.3300      42.0        51       137        60
OIR    2025130    131400  -10.1300 -136.3400      42.1        51       139        60
OIR    2025130    131400  -10.1300 -136.3500      42.1        51       139        60
OIR    2025130    131400  -10.1300 -136.3600      42.2        51       138        60
OIR    2025130    131400  -10.1300 -136.3700      42.2        51       137        60
OIR    2025130    131400  -10.1300 -136.3800      42.3        51       134        60
OIR    2025130    131400  -10.1300 -136.3900      42.3        51       135        60
OIR    2025130    131400  -10.1300 -136.4000      42.2        51       138        60
OIR    2025130    131400  -10.1300 -136.4100      42.2        50       139        60
OIR    2025130    131400  -10.1300 -136.4200      41.8        50       138        60
OIR    2025130    131400  -10.1300 -136.4300      40.6        49       136        60
OIR    2025130    131400  -10.1300 -136.4400      39.0        48       133        60
OIR    2025130    131400  -10.1300 -136.4500      38.5        47       132        60
OIR    2025130    131400  -10.1300 -136.4600      38.4        47       130        60
OIR    2025130    131400  -10.1300 -136.4700      38.3        47       133        60
OIR    2025130    131400  -10.1300 -136.4800      38.2        47       135        60
OIR    2025130    131400  -10.1300 -136.4900      38.2        47       135        60
OIR    2025130    131400  -10.1300 -136.5000      38.2        47       134        60
OIR    2025130    131400  -10.1300 -136.5100      38.2        47       132        60
OIR    2025130    131400  -10.1300 -136.5200      38.3        47       130        60
OIR    2025130    131400  -10.1300 -136.5300      38.3        47       127        60
OIR    2025130    131400  -10.1300 -136.5400      38.4        47       127        60
OIR    2025130    131400  -10.1300 -136.5500      38.4        47       128        60
OIR    2025130    131400  -10.1300 -136.5600      38.4        47       129        60
OIR    2025130    131400  -10.1300 -136.5700      38.4        47       130        60
OIR    2025130    131400  -10.1300 -136.5800      38.4        47       128        60
OIR    2025130    131400  -10.1300 -136.5900      38.3        47       126        60
OIR    2025130    131400  -10.1300 -136.6000      38.3        47       123        60
OIR    2025130    131400  -10.1300 -136.6100      38.3        47       123        60
OIR    2025130    131400  -10.1300 -136.6200      38.3        48       124        60
OIR    2025130    131400  -10.1300 -136.6300      38.3        48       124        60
OIR    2025130    131400  -10.1300 -136.6400      38.2        48       125        60
OIR    2025130    131400  -10.1300 -136.6500      38.2        48       120        60
OIR    2025130    131400  -10.1300 -136.6600      38.2        47       116        60
OIR    2025130    131400  -10.1300 -136.6700      38.2        47       116        60
OIR    2025130    131400  -10.1300 -136.6800      38.1        47       115        60
OIR    2025130    131400  -10.1300 -136.6900      37.9        47       117        60
OIR    2025130    131400  -10.1300 -136.7000      37.8        47       119        60
OIR    2025130    131400  -10.1300 -136.7100      37.6        46       117        60
OIR    2025130    131400  -10.1300 -136.7200      37.6        46       116        60
OIR    2025130    131400  -10.1300 -136.7300      37.5        46       117        60
OIR    2025130    131400  -10.1300 -136.7400      37.4        46       116        60
OIR    2025130    131400  -10.1300 -136.7500      37.4        45       114        60
OIR    2025130    131400  -10.1300 -136.7600      37.4        45       114        60
OIR    2025130    131400  -10.1300 -136.7700      37.4        45       115        60
OIR    2025130    131400  -10.1300 -136.7800      37.4        45       115        60
OIR    2025130    131400  -10.1300 -136.7900      37.5        45       116        60
OIR    2025130    131400  -10.1300 -136.8000      37.4        45       117        60
OIR    2025130    131400  -10.1300 -136.8100      37.3        44       120        60
OIR    2025130    131400  -10.1300 -136.8200      37.2        44       121        60
OIR    2025130    131400  -10.1300 -136.8300      37.2        44       122        60
OIR    2025130    131400  -10.1300 -136.8400      37.2        44       122        60
OIR    2025130    131400  -10.1300 -136.8500      37.2        44       124        60
OIR    2025130    131400  -10.1300 -136.8600      37.2        43       127        60
OIR    2025130    131400  -10.1300 -136.8700      36.9        40       128        60
OIR    2025130    131400  -10.1300 -136.8800      36.5        35       127        60
OIR    2025130    131400  -10.1300 -136.8900      36.2        32       122        60
OIR    2025130    131400  -10.1300 -136.9000      36.2        31       117        60
OIR    2025130    131400  -10.1300 -136.9100      36.3        30       115        60
OIR    2025130    131400  -10.1300 -136.9200      36.2        30       113        60
OIR    2025130    131400  -10.1300 -136.9300      36.2        30       111        60
OIR    2025130    131400  -10.1300 -136.9400      36.2        31       111        60
OIR    2025130    131400  -10.1300 -136.9500      36.3        31       114        60
OIR    2025130    131400  -10.1300 -136.9600      36.3        31       116        60
OIR    2025130    131400  -10.1300 -136.9700      36.3        31       121        60
OIR    2025130    131400  -10.1300 -136.9800      36.3        31       124        60
OIR    2025130    131400  -10.1300 -136.9900      36.2        32       126        60
OIR    2025130    131400  -10.1300 -137.0000      36.1        33       130        60
OIR    2025130    131400  -10.1300 -137.0100      36.0        33       133        60
OIR    2025130    131400  -10.1300 -137.0200      35.9        33       128        60
OIR    2025130    131400  -10.1300 -137.0300      35.9        32       124        60
OIR    2025130    131400  -10.1300 -137.0400      35.9        32       121        60
OIR    2025130    131400  -10.1300 -137.0500      35.9        32       117        60
OIR    2025130    131400  -10.1300 -137.0600      35.7        32       116        60
OIR    2025130    131400  -10.1300 -137.0700      35.5        33       116        60
OIR    2025130    131400  -10.1300 -137.0800      35.4        33       116        60
OIR    2025130    131400  -10.1300 -137.0900      35.5        33       117        60
OIR    2025130    131400  -10.1300 -137.1000      35.7        33       119        60
OIR    2025130    131400  -10.1300 -137.1100      35.8        33       121        60
OIR    2025130    131400  -10.1300 -137.1200      35.9        34       122        60
OIR    2025130    131400  -10.1300 -137.1300      36.1        34       121        60
OIR    2025130    131400  -10.1300 -137.1400      36.4        34       120        60
OIR    2025130    131400  -10.1300 -137.1500      36.8        34       117        60
OIR    2025130    131400  -10.1300 -137.1600      37.6        35       117        60
OIR    2025130    131400  -10.1300 -137.1700      38.1        35       119        60
OIR    2025130    131400  -10.1300 -137.1800      38.2        35       120        60
OIR    2025130    131400  -10.1300 -137.1900      38.2        35       121        60
OIR    2025130    131400  -10.1300 -137.2000      38.2        35       119        60
OIR    2025130    131400  -10.1300 -137.2100      38.1        35       117        60
OIR    2025130    131400  -10.1300 -137.2200      38.0        35       119        60
OIR    2025130    131400  -10.1300 -137.2300      37.9        35       120        60
OIR    2025130    131400  -10.1300 -137.2400      37.9        34       117        60
OIR    2025130    131400  -10.1300 -137.2500      37.8        34       116        60
OIR    2025130    131400  -10.1300 -137.2600      37.8        34       114        60
OIR    2025130    131400  -10.1300 -137.2700      37.7        33       113        60
OIR    2025130    131400  -10.1300 -137.2800      37.2        30       112        60
OIR    2025130    131400  -10.1300 -137.2900      37.0        25       113        60
OIR    2025130    131400  -10.1300 -137.3000      37.0        22       113        60
OIR    2025130    131400  -10.1300 -137.3100      37.4        19       110        60
OIR    2025130    131400  -10.1300 -137.3200      37.8        18       105        60
OIR    2025130    131400  -10.1300 -137.3300      37.7        17       104        60
OIR    2025130    131400  -10.1300 -137.3400      37.7        17       104        60
OIR    2025130    131400  -10.1300 -137.3500      37.8        17       104        60
OIR    2025130    131400  -10.1300 -137.3600      37.3        16       105        60
OIR    2025130    131400  -10.1300 -137.3700      36.5        16       105        60
OIR    2025130    131400  -10.1300 -137.3800      35.7        15       105        60
OIR    2025130    131400  -10.1300 -137.3900      35.1        14       105        60
OIR    2025130    131400  -10.1300 -137.4000      34.7        14       105        60
OIR    2025130    131400  -10.1300 -137.4100      34.5        13       104        60
OIR    2025130    131400  -10.1300 -137.4200      34.4        13       104        60
OIR    2025130    131400  -10.1300 -137.4300      34.2        13       104        60
OIR    2025130    131400  -10.1300 -137.4400      34.0        12       104        60
OIR    2025130    131400  -10.1300 -137.4500      33.7        11       105        60
OIR    2025130    131400  -10.1300 -137.4600      33.5        11       104        60
OIR    2025130    131400  -10.1300 -137.4700      33.4        10       104        60
OIR    2025130    131400  -10.1300 -137.4800      33.4        10       104        60
OIR    2025130    131400  -10.1300 -137.4900      33.5         9       105        60
OIR    2025130    131400  -10.1300 -137.5000      33.6         8       108        60
OIR    2025130    131400  -10.1300 -137.5100      33.7         8       110        60
OIR    2025130    131400  -10.1300 -137.5200      33.8         8       112        60
OIR    2025130    131400  -10.1300 -137.5300      33.9         7       112        60
OIR    2025130    131400  -10.1300 -137.5400      34.0         7       112        60
OIR    2025130    131400  -10.1300 -137.5500      34.1         7       113        60
OIR    2025130    131400  -10.1300 -137.5600      34.3         7       112        60
OIR    2025130    131400  -10.1300 -137.5700      34.5         7       109        60
OIR    2025130    131400  -10.1300 -137.5800      34.7         7       107        60
OIR    2025130    131400  -10.1300 -137.5900      34.8         7       107        60
OIR    2025130    131400  -10.1300 -137.6000      34.9         7       107        60
OIR    2025130    131400  -10.1300 -137.6100      35.0         7       108        60
OIR    2025130    131400  -10.1300 -137.6200      35.0         7       110        60
OIR    2025130    131400  -10.1300 -137.6300      35.0         7       112        60
OIR    2025130    131400  -10.1300 -137.6400      34.9         7       112        60
OIR    2025130    131400  -10.1300 -137.6500      34.9         6       113        60
OIR    2025130    131400  -10.1300 -137.6600      34.8         6       114        60
OIR    2025130    131400  -10.1300 -137.6700      34.6         6       115        60
OIR    2025130    131400  -10.1300 -137.6800      34.5         6       116        60
OIR    2025130    131400  -10.1300 -137.6900      34.4         6       117        60
OIR    2025130    131400  -10.1300 -137.7000      34.2         5       119        60
OIR    2025130    131400  -10.1300 -137.7100      34.0         5       119        60
OIR    2025130    131400  -10.1300 -137.7200      33.7         4       116        60
OIR    2025130    131400  -10.1300 -137.7300      33.1         2       116        60
OIR    2025130    131400  -10.1300 -137.7400      32.1       358       116        60
OIR    2025130    131400  -10.1300 -137.7500      31.8       356       115        60
OIR    2025130    131400  -10.1300 -137.7600      31.6       355       112        60
OIR    2025130    131400  -10.1300 -137.7700      31.5       355       110        60
OIR    2025130    131400  -10.1300 -137.7800      31.5       354       108        60
OIR    2025130    131400  -10.1300 -137.7900      31.6       354       109        60
OIR    2025130    131400  -10.1300 -137.8000      31.6       354       110        60
OIR    2025130    131400  -10.1300 -137.8100      31.5       354       111        60
OIR    2025130    131400  -10.1300 -137.8200      31.4       353       113        60
OIR    2025130    131400  -10.1300 -137.8300      31.2       353       115        60
OIR    2025130    131400  -10.1300 -137.8400      30.9       353       116        60
OIR    2025130    131400  -10.1300 -137.8500      30.3       352       117        60
OIR    2025130    131400  -10.1300 -137.8600      29.5       352       120        60
OIR    2025130    131400  -10.1300 -137.8700      29.0       352       122        60
OIR    2025130    131400  -10.1300 -137.8800      28.6       352       124        60
OIR    2025130    131400  -10.1300 -137.8900      28.4       352       126        60
OIR    2025130    131400  -10.1300 -137.9000      28.3       352       128        60
OIR    2025130    131400  -10.1300 -137.9100      28.3       352       130        60
OIR    2025130    131400  -10.1300 -137.9200      28.3       352       130        60
OIR    2025130    131400  -10.1300 -137.9300      28.2       351       131        60
OIR    2025130    131400  -10.1300 -137.9400      28.2       351       133        60
OIR    2025130    131400  -10.1300 -137.9500      28.2       350       135        60
OIR    2025130    131400  -10.1300 -137.9600      28.3       349       137        60
OIR    2025130    131400  -10.1300 -137.9700      28.4       347       138        60
OIR    2025130    131400  -10.1300 -137.9800      28.4       345       139        60
OIR    2025130    131400  -10.1300 -137.9900      28.3       344       136        60
OIR    2025130    131400  -10.1300 -138.0000      28.3       344       133        60
OIR    2025130    131400  -10.1300 -138.0100      28.2       343       133        60
OIR    2025130    131400  -10.1300 -138.0200      28.2       343       133        60
OIR    2025130    131400  -10.1300 -138.0300      28.2       343       133        60
OIR    2025130    131400  -10.1300 -138.0400      28.2       342       133        60
OIR    2025130    131400  -10.1300 -138.0500      28.2       342       132        60
OIR    2025130    131400  -10.1300 -138.0600      28.2       342       132        60
OIR    2025130    131400  -10.1300 -138.0700      28.2       342       131        60
OIR    2025130    131400  -10.1300 -138.0800      28.2       342       131        60
OIR    2025130    131400  -10.1300 -138.0900      28.2       342       132        60
OIR    2025130    131400  -10.1300 -138.1000      28.2       342       131        60
OIR    2025130    131400  -10.1300 -138.1100      28.2       342       130        60
OIR    2025130    131400  -10.1300 -138.1200      28.2       342       129        60
OIR    2025130    131400  -10.1300 -138.1300      28.1       342       128        60
OIR    2025130    131400  -10.1300 -138.1400      28.1       342       129        60
OIR    2025130    131400  -10.1300 -138.1500      28.1       342       130        60
OIR    2025130    131400  -10.1300 -138.1600      28.1       342       131        60
OIR    2025130    131400  -10.1300 -138.1700      28.1       342       132        60
OIR    2025130    131400  -10.1300 -138.1800      28.1       342       132        60
OIR    2025130    131400  -10.1300 -138.1900      28.1       341       132        60
OIR    2025130    131400  -10.1300 -138.2000      28.0       341       132        60
OIR    2025130    131400  -10.1300 -138.2100      28.0       341       134        60
OIR    2025130    131400  -10.1300 -138.2200      28.0       341       136        60
OIR    2025130    131400  -10.1300 -138.2300      28.0       341       135        60
OIR    2025130    131400  -10.1300 -138.2400      27.9       341       133        60
OIR    2025130    131400  -10.1300 -138.2500      27.8       340       133        60
OIR    2025130    131400  -10.1300 -138.2600      27.7       339       135        60
OIR    2025130    131400  -10.1300 -138.2700      27.6       339       141        60
OIR    2025130    131400  -10.1300 -138.2800      27.6       339       145        60
OIR    2025130    131400  -10.1300 -138.2900      27.6       339       148        60
OIR    2025130    131400  -10.1300 -138.3000      27.6       339       147        60
OIR    2025130    131400  -10.1300 -138.3100      27.6       339       144        60
OIR    2025130    131400  -10.1300 -138.3200      27.6       339       141        60
OIR    2025130    131400  -10.1300 -138.3300      27.6       339       139        60
OIR    2025130    131400  -10.1300 -138.3400      27.6       339       139        60
OIR    2025130    131400  -10.1300 -138.3500      27.6       338       140        60
OIR    2025130    131400  -10.1300 -138.3600      27.6       338       139        60
OIR    2025130    131400  -10.1300 -138.3700      27.6       338       139        60
OIR    2025130    131400  -10.1300 -138.3800      27.7       338       139        60
OIR    2025130    131400  -10.1300 -138.3900      27.7       338       139        60
OIR    2025130    131400  -10.1300 -138.4000      27.7       338       139        60
OIR    2025130    131400  -10.1300 -138.4100      27.7       338       140        60
OIR    2025130    131400  -10.1300 -138.4200      27.7       338       139        60
OIR    2025130    131400  -10.1300 -138.4300      27.7       337       145        60
OIR    2025130    131400  -10.1400 -136.1800      40.2        54       148        60
OIR    2025130    131400  -10.1400 -136.1900      40.3        54       146        60
OIR    2025130    131400  -10.1400 -136.2000      40.3        54       144        60
OIR    2025130    131400  -10.1400 -136.2100      40.4        54       143        60
OIR    2025130    131400  -10.1400 -136.2200      40.4        54       141        60
OIR    2025130    131400  -10.1400 -136.2300      40.6        53       142        60
OIR    2025130    131400  -10.1400 -136.2400      40.7        53       144        60
OIR    2025130    131400  -10.1400 -136.2500      40.9        53       146        60
OIR    2025130    131400  -10.1400 -136.2600      41.3        52       147        60
OIR    2025130    131400  -10.1400 -136.2700      41.6        52       147        60
OIR    2025130    131400  -10.1400 -136.2800      41.9        51       147        60
OIR    2025130    131400  -10.1400 -136.2900      42.1        51       147        60
OIR    2025130    131400  -10.1400 -136.3000      42.2        51       145        60
OIR    2025130    131400  -10.1400 -136.3100      42.2        51       143        60
OIR    2025130    131400  -10.1400 -136.3200      42.2        51       139        60
OIR    2025130    131400  -10.1400 -136.3300      42.2        51       136        60
OIR    2025130    131400  -10.1400 -136.3400      42.2        51       137        60
OIR    2025130    131400  -10.1400 -136.3500      42.2        51       138        60
OIR    2025130    131400  -10.1400 -136.3600      42.2        51       137        60
OIR    2025130    131400  -10.1400 -136.3700      42.3        51       136        60
OIR    2025130    131400  -10.1400 -136.3800      42.3        51       133        60
OIR    2025130    131400  -10.1400 -136.3900      42.3        51       134        60
OIR    2025130    131400  -10.1400 -136.4000      42.3        51       137        60
OIR    2025130    131400  -10.1400 -136.4100      42.3        51       138        60
OIR    2025130    131400  -10.1400 -136.4200      42.3        50       139        60
OIR    2025130    131400  -10.1400 -136.4300      41.6        50       137        60
OIR    2025130    131400  -10.1400 -136.4400      39.4        48       135        60
OIR    2025130    131400  -10.1400 -136.4500      38.5        47       134        60
OIR    2025130    131400  -10.1400 -136.4600      38.4        47       133        60
OIR    2025130    131400  -10.1400 -136.4700      38.3        47       133        60
OIR    2025130    131400  -10.1400 -136.4800      38.2        47       134        60
OIR    2025130    131400  -10.1400 -136.4900      38.2        47       133        60
OIR    2025130    131400  -10.1400 -136.5000      38.2        47       132        60
OIR    2025130    131400  -10.1400 -136.5100      38.2        47       132        60
OIR    2025130    131400  -10.1400 -136.5200      38.3        47       130        60
OIR    2025130    131400  -10.1400 -136.5300      38.3        47       127        60
OIR    2025130    131400  -10.1400 -136.5400      38.4        47       127        60
OIR    2025130    131400  -10.1400 -136.5500      38.4        47       127        60
OIR    2025130    131400  -10.1400 -136.5600      38.4        47       128        60
OIR    2025130    131400  -10.1400 -136.5700      38.4        47       129        60
OIR    2025130    131400  -10.1400 -136.5800      38.4        47       128        60
OIR    2025130    131400  -10.1400 -136.5900      38.3        47       126        60
OIR    2025130    131400  -10.1400 -136.6000      38.3        47       123        60
OIR    2025130    131400  -10.1400 -136.6100      38.3        47       124        60
OIR    2025130    131400  -10.1400 -136.6200      38.3        47       126        60
OIR    2025130    131400  -10.1400 -136.6300      38.3        47       126        60
OIR    2025130    131400  -10.1400 -136.6400      38.3        47       126        60
OIR    2025130    131400  -10.1400 -136.6500      38.2        47       121        60
OIR    2025130    131400  -10.1400 -136.6600      38.2        47       116        60
OIR    2025130    131400  -10.1400 -136.6700      38.2        47       116        60
OIR    2025130    131400  -10.1400 -136.6800      38.2        47       115        60
OIR    2025130    131400  -10.1400 -136.6900      38.1        46       117        60
OIR    2025130    131400  -10.1400 -136.7000      38.0        46       120        60
OIR    2025130    131400  -10.1400 -136.7100      37.8        46       117        60
OIR    2025130    131400  -10.1400 -136.7200      37.7        46       116        60
OIR    2025130    131400  -10.1400 -136.7300      37.7        45       117        60
OIR    2025130    131400  -10.1400 -136.7400      37.6        45       116        60
OIR    2025130    131400  -10.1400 -136.7500      37.6        45       115        60
OIR    2025130    131400  -10.1400 -136.7600      37.5        45       115        60
OIR    2025130    131400  -10.1400 -136.7700      37.5        45       115        60
OIR    2025130    131400  -10.1400 -136.7800      37.5        45       115        60
OIR    2025130    131400  -10.1400 -136.7900      37.5        44       116        60
OIR    2025130    131400  -10.1400 -136.8000      37.5        44       117        60
OIR    2025130    131400  -10.1400 -136.8100      37.4        44       119        60
OIR    2025130    131400  -10.1400 -136.8200      37.4        44       120        60
OIR    2025130    131400  -10.1400 -136.8300      37.3        44       120        60
OIR    2025130    131400  -10.1400 -136.8400      37.3        43       121        60
OIR    2025130    131400  -10.1400 -136.8500      37.3        43       123        60
OIR    2025130    131400  -10.1400 -136.8600      37.4        43       127        60
OIR    2025130    131400  -10.1400 -136.8700      36.9        39       126        60
OIR    2025130    131400  -10.1400 -136.8800      36.5        33       125        60
OIR    2025130    131400  -10.1400 -136.8900      36.4        31       122        60
OIR    2025130    131400  -10.1400 -136.9000      36.3        31       117        60
OIR    2025130    131400  -10.1400 -136.9100      36.3        30       115        60
OIR    2025130    131400  -10.1400 -136.9200      36.3        30       111        60
OIR    2025130    131400  -10.1400 -136.9300      36.3        30       109        60
OIR    2025130    131400  -10.1400 -136.9400      36.3        30       108        60
OIR    2025130    131400  -10.1400 -136.9500      36.3        31       111        60
OIR    2025130    131400  -10.1400 -136.9600      36.4        31       115        60
OIR    2025130    131400  -10.1400 -136.9700      36.4        31       121        60
OIR    2025130    131400  -10.1400 -136.9800      36.3        31       125        60
OIR    2025130    131400  -10.1400 -136.9900      36.3        31       129        60
OIR    2025130    131400  -10.1400 -137.0000      36.1        32       130        60
OIR    2025130    131400  -10.1400 -137.0100      36.1        32       130        60
OIR    2025130    131400  -10.1400 -137.0200      36.0        32       122        60
OIR    2025130    131400  -10.1400 -137.0300      36.0        32       116        60
OIR    2025130    131400  -10.1400 -137.0400      36.0        32       115        60
OIR    2025130    131400  -10.1400 -137.0500      36.0        32       113        60
OIR    2025130    131400  -10.1400 -137.0600      35.9        32       112        60
OIR    2025130    131400  -10.1400 -137.0700      35.8        33       112        60
OIR    2025130    131400  -10.1400 -137.0800      35.8        33       114        60
OIR    2025130    131400  -10.1400 -137.0900      35.9        33       115        60
OIR    2025130    131400  -10.1400 -137.1000      35.9        33       116        60
OIR    2025130    131400  -10.1400 -137.1100      36.0        33       117        60
OIR    2025130    131400  -10.1400 -137.1200      36.2        33       117        60
OIR    2025130    131400  -10.1400 -137.1300      36.3        34       117        60
OIR    2025130    131400  -10.1400 -137.1400      36.6        34       117        60
OIR    2025130    131400  -10.1400 -137.1500      37.3        34       117        60
OIR    2025130    131400  -10.1400 -137.1600      38.0        35       119        60
OIR    2025130    131400  -10.1400 -137.1700      38.2        35       121        60
OIR    2025130    131400  -10.1400 -137.1800      38.2        35       121        60
OIR    2025130    131400  -10.1400 -137.1900      38.3        35       120        60
OIR    2025130    131400  -10.1400 -137.2000      38.2        35       119        60
OIR    2025130    131400  -10.1400 -137.2100      38.2        35       116        60
OIR    2025130    131400  -10.1400 -137.2200      38.1        35       117        60
OIR    2025130    131400  -10.1400 -137.2300      38.0        34       120        60
OIR    2025130    131400  -10.1400 -137.2400      37.9        34       117        60
OIR    2025130    131400  -10.1400 -137.2500      37.8        34       116        60
OIR    2025130    131400  -10.1400 -137.2600      37.7        33       114        60
OIR    2025130    131400  -10.1400 -137.2700      37.4        31       113        60
OIR    2025130    131400  -10.1400 -137.2800      36.7        26       114        60
OIR    2025130    131400  -10.1400 -137.2900      36.7        21       114        60
OIR    2025130    131400  -10.1400 -137.3000      36.8        19       112        60
OIR    2025130    131400  -10.1400 -137.3100      37.2        18       108        60
OIR    2025130    131400  -10.1400 -137.3200      37.5        17       104        60
OIR    2025130    131400  -10.1400 -137.3300      37.5        17       103        60
OIR    2025130    131400  -10.1400 -137.3400      37.5        16       103        60
OIR    2025130    131400  -10.1400 -137.3500      37.4        16       104        60
OIR    2025130    131400  -10.1400 -137.3600      37.1        16       104        60
OIR    2025130    131400  -10.1400 -137.3700      36.2        15       105        60
OIR    2025130    131400  -10.1400 -137.3800      35.4        14       107        60
OIR    2025130    131400  -10.1400 -137.3900      34.9        14       105        60
OIR    2025130    131400  -10.1400 -137.4000      34.7        13       104        60
OIR    2025130    131400  -10.1400 -137.4100      34.5        13       104        60
OIR    2025130    131400  -10.1400 -137.4200      34.4        13       104        60
OIR    2025130    131400  -10.1400 -137.4300      34.2        13       104        60
OIR    2025130    131400  -10.1400 -137.4400      34.0        12       105        60
OIR    2025130    131400  -10.1400 -137.4500      33.7        12       107        60
OIR    2025130    131400  -10.1400 -137.4600      33.4        11       105        60
OIR    2025130    131400  -10.1400 -137.4700      33.3        10       105        60
OIR    2025130    131400  -10.1400 -137.4800      33.2         9       105        60
OIR    2025130    131400  -10.1400 -137.4900      33.2         9       107        60
OIR    2025130    131400  -10.1400 -137.5000      33.3         8       108        60
OIR    2025130    131400  -10.1400 -137.5100      33.5         8       109        60
OIR    2025130    131400  -10.1400 -137.5200      33.6         7       110        60
OIR    2025130    131400  -10.1400 -137.5300      33.7         7       111        60
OIR    2025130    131400  -10.1400 -137.5400      33.8         7       111        60
OIR    2025130    131400  -10.1400 -137.5500      33.9         7       112        60
OIR    2025130    131400  -10.1400 -137.5600      34.0         7       112        60
OIR    2025130    131400  -10.1400 -137.5700      34.2         7       109        60
OIR    2025130    131400  -10.1400 -137.5800      34.5         7       107        60
OIR    2025130    131400  -10.1400 -137.5900      34.7         7       105        60
OIR    2025130    131400  -10.1400 -137.6000      34.9         7       107        60
OIR    2025130    131400  -10.1400 -137.6100      34.9         7       108        60
OIR    2025130    131400  -10.1400 -137.6200      34.9         7       108        60
OIR    2025130    131400  -10.1400 -137.6300      34.9         7       109        60
OIR    2025130    131400  -10.1400 -137.6400      34.9         7       110        60
OIR    2025130    131400  -10.1400 -137.6500      34.8         6       110        60
OIR    2025130    131400  -10.1400 -137.6600      34.7         6       113        60
OIR    2025130    131400  -10.1400 -137.6700      34.5         6       115        60
OIR    2025130    131400  -10.1400 -137.6800      34.4         6       116        60
OIR    2025130    131400  -10.1400 -137.6900      34.2         6       117        60
OIR    2025130    131400  -10.1400 -137.7000      34.0         5       119        60
OIR    2025130    131400  -10.1400 -137.7100      33.7         5       120        60
OIR    2025130    131400  -10.1400 -137.7200      33.2         3       116        60
OIR    2025130    131400  -10.1400 -137.7300      32.7         1       116        60
OIR    2025130    131400  -10.1400 -137.7400      31.8       358       117        60
OIR    2025130    131400  -10.1400 -137.7500      31.4       356       115        60
OIR    2025130    131400  -10.1400 -137.7600      31.3       355       112        60
OIR    2025130    131400  -10.1400 -137.7700      31.2       355       109        60
OIR    2025130    131400  -10.1400 -137.7800      31.2       354       108        60
OIR    2025130    131400  -10.1400 -137.7900      31.2       354       109        60
OIR    2025130    131400  -10.1400 -137.8000      31.2       354       110        60
OIR    2025130    131400  -10.1400 -137.8100      31.1       354       112        60
OIR    2025130    131400  -10.1400 -137.8200      31.0       353       115        60
OIR    2025130    131400  -10.1400 -137.8300      30.7       353       116        60
OIR    2025130    131400  -10.1400 -137.8400      30.3       353       119        60
OIR    2025130    131400  -10.1400 -137.8500      29.6       352       121        60
OIR    2025130    131400  -10.1400 -137.8600      28.9       352       123        60
OIR    2025130    131400  -10.1400 -137.8700      28.5       352       126        60
OIR    2025130    131400  -10.1400 -137.8800      28.3       352       127        60
OIR    2025130    131400  -10.1400 -137.8900      28.2       352       128        60
OIR    2025130    131400  -10.1400 -137.9000      28.2       352       130        60
OIR    2025130    131400  -10.1400 -137.9100      28.1       352       132        60
OIR    2025130    131400  -10.1400 -137.9200      28.1       352       134        60
OIR    2025130    131400  -10.1400 -137.9300      28.1       351       135        60
OIR    2025130    131400  -10.1400 -137.9400      28.1       351       137        60
OIR    2025130    131400  -10.1400 -137.9500      28.0       350       138        60
OIR    2025130    131400  -10.1400 -137.9600      28.0       349       139        60
OIR    2025130    131400  -10.1400 -137.9700      28.0       348       141        60
OIR    2025130    131400  -10.1400 -137.9800      28.0       346       142        60
OIR    2025130    131400  -10.1400 -137.9900      28.1       344       139        60
OIR    2025130    131400  -10.1400 -138.0000      28.1       344       136        60
OIR    2025130    131400  -10.1400 -138.0100      28.1       343       135        60
OIR    2025130    131400  -10.1400 -138.0200      28.2       343       135        60
OIR    2025130    131400  -10.1400 -138.0300      28.2       342       135        60
OIR    2025130    131400  -10.1400 -138.0400      28.2       342       134        60
OIR    2025130    131400  -10.1400 -138.0500      28.2       342       133        60
OIR    2025130    131400  -10.1400 -138.0600      28.2       342       132        60
OIR    2025130    131400  -10.1400 -138.0700      28.2       342       131        60
OIR    2025130    131400  -10.1400 -138.0800      28.2       342       130        60
OIR    2025130    131400  -10.1400 -138.0900      28.2       342       130        60
OIR    2025130    131400  -10.1400 -138.1000      28.2       342       130        60
OIR    2025130    131400  -10.1400 -138.1100      28.2       342       129        60
OIR    2025130    131400  -10.1400 -138.1200      28.1       342       129        60
OIR    2025130    131400  -10.1400 -138.1300      28.1       342       129        60
OIR    2025130    131400  -10.1400 -138.1400      28.1       342       130        60
OIR    2025130    131400  -10.1400 -138.1500      28.1       342       131        60
OIR    2025130    131400  -10.1400 -138.1600      28.1       342       133        60
OIR    2025130    131400  -10.1400 -138.1700      28.1       342       133        60
OIR    2025130    131400  -10.1400 -138.1800      28.1       342       133        60
OIR    2025130    131400  -10.1400 -138.1900      28.1       342       133        60
OIR    2025130    131400  -10.1400 -138.2000      28.0       341       132        60
OIR    2025130    131400  -10.1400 -138.2100      28.0       341       134        60
OIR    2025130    131400  -10.1400 -138.2200      28.0       341       135        60
OIR    2025130    131400  -10.1400 -138.2300      28.0       341       135        60
OIR    2025130    131400  -10.1400 -138.2400      27.8       340       135        60
OIR    2025130    131400  -10.1400 -138.2500      27.7       339       133        60
OIR    2025130    131400  -10.1400 -138.2600      27.6       339       134        60
OIR    2025130    131400  -10.1400 -138.2700      27.6       339       139        60
OIR    2025130    131400  -10.1400 -138.2800      27.6       339       144        60
OIR    2025130    131400  -10.1400 -138.3100      27.6       339       146        60
OIR    2025130    131400  -10.1400 -138.3200      27.6       339       142        60
OIR    2025130    131400  -10.1400 -138.3300      27.6       339       140        60
OIR    2025130    131400  -10.1400 -138.3400      27.6       339       141        60
OIR    2025130    131400  -10.1400 -138.3500      27.6       338       141        60
OIR    2025130    131400  -10.1400 -138.3600      27.6       338       141        60
OIR    2025130    131400  -10.1400 -138.3700      27.6       338       141        60
OIR    2025130    131400  -10.1400 -138.3800      27.7       338       142        60
OIR    2025130    131400  -10.1400 -138.3900      27.7       338       143        60
OIR    2025130    131400  -10.1400 -138.4000      27.7       338       145        60
OIR    2025130    131400  -10.1400 -138.4100      27.7       338       146        60
OIR    2025130    131400  -10.1400 -138.4200      27.7       338       146        60
OIR    2025130    131400  -10.1400 -138.4300      27.7       338       148        60
OIR    2025130    131400  -10.1500 -136.1700      40.1        53       148        60
OIR    2025130    131400  -10.1500 -136.1800      40.2        54       147        60
OIR    2025130    131400  -10.1500 -136.1900      40.3        54       147        60
OIR    2025130    131400  -10.1500 -136.2000      40.3        54       147        60
OIR    2025130    131400  -10.1500 -136.2100      40.4        54       147        60
OIR    2025130    131400  -10.1500 -136.2200      40.5        53       147        60
OIR    2025130    131400  -10.1500 -136.2300      40.6        53       148        60
OIR    2025130    131400  -10.1500 -136.2400      40.7        53       148        60
OIR    2025130    131400  -10.1500 -136.2500      41.0        53       148        60
OIR    2025130    131400  -10.1500 -136.2600      41.5        52       147        60
OIR    2025130    131400  -10.1500 -136.2700      41.8        51       146        60
OIR    2025130    131400  -10.1500 -136.2800      42.1        51       144        60
OIR    2025130    131400  -10.1500 -136.2900      42.2        51       141        60
OIR    2025130    131400  -10.1500 -136.3000      42.2        51       141        60
OIR    2025130    131400  -10.1500 -136.3100      42.2        51       140        60
OIR    2025130    131400  -10.1500 -136.3200      42.2        51       137        60
OIR    2025130    131400  -10.1500 -136.3300      42.2        51       135        60
OIR    2025130    131400  -10.1500 -136.3400      42.2        51       137        60
OIR    2025130    131400  -10.1500 -136.3500      42.3        51       138        60
OIR    2025130    131400  -10.1500 -136.3600      42.3        51       138        60
OIR    2025130    131400  -10.1500 -136.3700      42.3        51       136        60
OIR    2025130    131400  -10.1500 -136.3800      42.3        51       133        60
OIR    2025130    131400  -10.1500 -136.3900      42.3        51       133        60
OIR    2025130    131400  -10.1500 -136.4000      42.4        51       136        60
OIR    2025130    131400  -10.1500 -136.4100      42.4        51       138        60
OIR    2025130    131400  -10.1500 -136.4200      42.4        50       140        60
OIR    2025130    131400  -10.1500 -136.4300      42.2        50       139        60
OIR    2025130    131400  -10.1500 -136.4400      40.2        48       137        60
OIR    2025130    131400  -10.1500 -136.4500      38.4        46       136        60
OIR    2025130    131400  -10.1500 -136.4600      38.3        46       136        60
OIR    2025130    131400  -10.1500 -136.4700      38.3        46       134        60
OIR    2025130    131400  -10.1500 -136.4800      38.2        46       132        60
OIR    2025130    131400  -10.1500 -136.4900      38.2        47       131        60
OIR    2025130    131400  -10.1500 -136.5000      38.2        47       131        60
OIR    2025130    131400  -10.1500 -136.5100      38.2        47       131        60
OIR    2025130    131400  -10.1500 -136.5200      38.3        47       130        60
OIR    2025130    131400  -10.1500 -136.5300      38.3        47       128        60
OIR    2025130    131400  -10.1500 -136.5400      38.4        47       126        60
OIR    2025130    131400  -10.1500 -136.5500      38.4        47       125        60
OIR    2025130    131400  -10.1500 -136.5600      38.4        47       126        60
OIR    2025130    131400  -10.1500 -136.5700      38.4        47       127        60
OIR    2025130    131400  -10.1500 -136.5800      38.4        47       126        60
OIR    2025130    131400  -10.1500 -136.5900      38.3        47       125        60
OIR    2025130    131400  -10.1500 -136.6000      38.3        47       123        60
OIR    2025130    131400  -10.1500 -136.6100      38.3        47       124        60
OIR    2025130    131400  -10.1500 -136.6200      38.3        47       127        60
OIR    2025130    131400  -10.1500 -136.6300      38.3        47       128        60
OIR    2025130    131400  -10.1500 -136.6400      38.3        47       128        60
OIR    2025130    131400  -10.1500 -136.6500      38.3        47       124        60
OIR    2025130    131400  -10.1500 -136.6600      38.2        47       120        60
OIR    2025130    131400  -10.1500 -136.6700      38.2        47       117        60
OIR    2025130    131400  -10.1500 -136.6800      38.2        46       116        60
OIR    2025130    131400  -10.1500 -136.6900      38.3        46       117        60
OIR    2025130    131400  -10.1500 -136.7000      38.2        46       117        60
OIR    2025130    131400  -10.1500 -136.7100      38.1        46       116        60
OIR    2025130    131400  -10.1500 -136.7200      37.9        46       116        60
OIR    2025130    131400  -10.1500 -136.7300      37.8        45       116        60
OIR    2025130    131400  -10.1500 -136.7400      37.7        45       116        60
OIR    2025130    131400  -10.1500 -136.7500      37.6        45       116        60
OIR    2025130    131400  -10.1500 -136.7600      37.6        45       116        60
OIR    2025130    131400  -10.1500 -136.7700      37.6        45       115        60
OIR    2025130    131400  -10.1500 -136.7800      37.5        45       115        60
OIR    2025130    131400  -10.1500 -136.7900      37.5        44       116        60
OIR    2025130    131400  -10.1500 -136.8000      37.5        44       116        60
OIR    2025130    131400  -10.1500 -136.8100      37.5        44       116        60
OIR    2025130    131400  -10.1500 -136.8200      37.4        44       119        60
OIR    2025130    131400  -10.1500 -136.8300      37.4        43       120        60
OIR    2025130    131400  -10.1500 -136.8400      37.3        43       120        60
OIR    2025130    131400  -10.1500 -136.8500      37.3        43       123        60
OIR    2025130    131400  -10.1500 -136.8600      37.3        42       127        60
OIR    2025130    131400  -10.1500 -136.8700      36.8        36       125        60
OIR    2025130    131400  -10.1500 -136.8800      36.6        32       122        60
OIR    2025130    131400  -10.1500 -136.8900      36.5        31       117        60
OIR    2025130    131400  -10.1500 -136.9000      36.4        31       115        60
OIR    2025130    131400  -10.1500 -136.9100      36.4        30       112        60
OIR    2025130    131400  -10.1500 -136.9200      36.4        30       109        60
OIR    2025130    131400  -10.1500 -136.9300      36.4        30       105        60
OIR    2025130    131400  -10.1500 -136.9400      36.4        30       105        60
OIR    2025130    131400  -10.1500 -136.9500      36.4        31       107        60
OIR    2025130    131400  -10.1500 -136.9600      36.4        31       112        60
OIR    2025130    131400  -10.1500 -136.9700      36.4        31       120        60
OIR    2025130    131400  -10.1500 -136.9800      36.4        31       125        60
OIR    2025130    131400  -10.1500 -136.9900      36.4        31       130        60
OIR    2025130    131400  -10.1500 -137.0000      36.2        32       131        60
OIR    2025130    131400  -10.1500 -137.0100      36.1        32       128        60
OIR    2025130    131400  -10.1500 -137.0200      36.1        32       117        60
OIR    2025130    131400  -10.1500 -137.0300      36.0        32       112        60
OIR    2025130    131400  -10.1500 -137.0400      36.0        32       110        60
OIR    2025130    131400  -10.1500 -137.0500      36.0        32       110        60
OIR    2025130    131400  -10.1500 -137.0600      36.0        32       111        60
OIR    2025130    131400  -10.1500 -137.0700      35.9        33       111        60
OIR    2025130    131400  -10.1500 -137.0800      35.9        33       110        60
OIR    2025130    131400  -10.1500 -137.0900      35.9        33       113        60
OIR    2025130    131400  -10.1500 -137.1000      36.0        33       116        60
OIR    2025130    131400  -10.1500 -137.1100      36.1        33       115        60
OIR    2025130    131400  -10.1500 -137.1200      36.4        33       113        60
OIR    2025130    131400  -10.1500 -137.1300      36.6        34       113        60
OIR    2025130    131400  -10.1500 -137.1400      36.9        34       114        60
OIR    2025130    131400  -10.1500 -137.1500      37.6        34       116        60
OIR    2025130    131400  -10.1500 -137.1600      38.2        35       120        60
OIR    2025130    131400  -10.1500 -137.1700      38.2        35       124        60
OIR    2025130    131400  -10.1500 -137.1800      38.3        35       124        60
OIR    2025130    131400  -10.1500 -137.1900      38.3        35       122        60
OIR    2025130    131400  -10.1500 -137.2000      38.3        35       120        60
OIR    2025130    131400  -10.1500 -137.2100      38.2        35       116        60
OIR    2025130    131400  -10.1500 -137.2200      38.1        35       117        60
OIR    2025130    131400  -10.1500 -137.2300      38.0        34       120        60
OIR    2025130    131400  -10.1500 -137.2400      38.0        34       117        60
OIR    2025130    131400  -10.1500 -137.2500      37.9        33       115        60
OIR    2025130    131400  -10.1500 -137.2600      37.7        33       113        60
OIR    2025130    131400  -10.1500 -137.2700      37.2        29       112        60
OIR    2025130    131400  -10.1500 -137.2800      36.4        22       116        60
OIR    2025130    131400  -10.1500 -137.2900      36.6        19       114        60
OIR    2025130    131400  -10.1500 -137.3000      36.8        18       109        60
OIR    2025130    131400  -10.1500 -137.3100      37.0        17       105        60
OIR    2025130    131400  -10.1500 -137.3200      37.3        17       104        60
OIR    2025130    131400  -10.1500 -137.3300      37.3        16       103        60
OIR    2025130    131400  -10.1500 -137.3400      37.3        16       103        60
OIR    2025130    131400  -10.1500 -137.3500      37.1        16       103        60
OIR    2025130    131400  -10.1500 -137.3600      36.8        15       104        60
OIR    2025130    131400  -10.1500 -137.3700      35.6        14       107        60
OIR    2025130    131400  -10.1500 -137.3800      35.0        14       108        60
OIR    2025130    131400  -10.1500 -137.3900      34.7        13       104        60
OIR    2025130    131400  -10.1500 -137.4000      34.5        13       103        60
OIR    2025130    131400  -10.1500 -137.4100      34.4        13       103        60
OIR    2025130    131400  -10.1500 -137.4200      34.3        13       104        60
OIR    2025130    131400  -10.1500 -137.4300      34.2        13       104        60
OIR    2025130    131400  -10.1500 -137.4400      33.9        12       105        60
OIR    2025130    131400  -10.1500 -137.4500      33.6        12       107        60
OIR    2025130    131400  -10.1500 -137.4600      33.3        11       107        60
OIR    2025130    131400  -10.1500 -137.4700      33.1        10       107        60
OIR    2025130    131400  -10.1500 -137.4800      32.9         9       107        60
OIR    2025130    131400  -10.1500 -137.4900      32.9         9       108        60
OIR    2025130    131400  -10.1500 -137.5000      32.9         8       108        60
OIR    2025130    131400  -10.1500 -137.5100      33.2         7       108        60
OIR    2025130    131400  -10.1500 -137.5200      33.3         7       108        60
OIR    2025130    131400  -10.1500 -137.5300      33.5         7       109        60
OIR    2025130    131400  -10.1500 -137.5400      33.6         7       110        60
OIR    2025130    131400  -10.1500 -137.5500      33.6         7       111        60
OIR    2025130    131400  -10.1500 -137.5600      33.6         6       112        60
OIR    2025130    131400  -10.1500 -137.5700      33.7         6       109        60
OIR    2025130    131400  -10.1500 -137.5800      34.1         6       107        60
OIR    2025130    131400  -10.1500 -137.5900      34.5         7       107        60
OIR    2025130    131400  -10.1500 -137.6000      34.8         7       107        60
OIR    2025130    131400  -10.1500 -137.6100      34.9         7       107        60
OIR    2025130    131400  -10.1500 -137.6200      34.9         7       107        60
OIR    2025130    131400  -10.1500 -137.6300      34.9         7       105        60
OIR    2025130    131400  -10.1500 -137.6400      34.8         7       108        60
OIR    2025130    131400  -10.1500 -137.6500      34.7         6       109        60
OIR    2025130    131400  -10.1500 -137.6600      34.5         6       111        60
OIR    2025130    131400  -10.1500 -137.6700      34.3         6       114        60
OIR    2025130    131400  -10.1500 -137.6800      34.1         6       116        60
OIR    2025130    131400  -10.1500 -137.6900      33.8         6       119        60
OIR    2025130    131400  -10.1500 -137.7000      33.5         5       120        60
OIR    2025130    131400  -10.1500 -137.7100      33.2         4       121        60
OIR    2025130    131400  -10.1500 -137.7200      32.7         3       120        60
OIR    2025130    131400  -10.1500 -137.7300      32.1         1       119        60
OIR    2025130    131400  -10.1500 -137.7400      31.3       357       119        60
OIR    2025130    131400  -10.1500 -137.7500      31.0       356       115        60
OIR    2025130    131400  -10.1500 -137.7600      30.9       355       111        60
OIR    2025130    131400  -10.1500 -137.7700      30.8       355       109        60
OIR    2025130    131400  -10.1500 -137.7800      30.7       354       108        60
OIR    2025130    131400  -10.1500 -137.7900      30.7       354       108        60
OIR    2025130    131400  -10.1500 -137.8000      30.7       354       110        60
OIR    2025130    131400  -10.1500 -137.8100      30.7       354       113        60
OIR    2025130    131400  -10.1500 -137.8200      30.5       353       116        60
OIR    2025130    131400  -10.1500 -137.8300      30.1       353       119        60
OIR    2025130    131400  -10.1500 -137.8400      29.6       353       122        60
OIR    2025130    131400  -10.1500 -137.8500      28.9       352       125        60
OIR    2025130    131400  -10.1500 -137.8600      28.4       352       127        60
OIR    2025130    131400  -10.1500 -137.8700      28.2       352       129        60
OIR    2025130    131400  -10.1500 -137.8800      28.2       352       129        60
OIR    2025130    131400  -10.1500 -137.8900      28.1       352       129        60
OIR    2025130    131400  -10.1500 -137.9000      28.1       352       132        60
OIR    2025130    131400  -10.1500 -137.9100      28.1       352       134        60
OIR    2025130    131400  -10.1500 -137.9200      28.1       352       137        60
OIR    2025130    131400  -10.1500 -137.9300      28.0       351       139        60
OIR    2025130    131400  -10.1500 -137.9400      28.0       351       140        60
OIR    2025130    131400  -10.1500 -137.9500      27.8       350       141        60
OIR    2025130    131400  -10.1500 -137.9600      27.7       349       141        60
OIR    2025130    131400  -10.1500 -137.9700      27.6       348       143        60
OIR    2025130    131400  -10.1500 -137.9800      27.7       346       145        60
OIR    2025130    131400  -10.1500 -137.9900      27.9       344       142        60
OIR    2025130    131400  -10.1500 -138.0000      28.0       343       139        60
OIR    2025130    131400  -10.1500 -138.0100      28.0       343       139        60
OIR    2025130    131400  -10.1500 -138.0200      28.1       343       138        60
OIR    2025130    131400  -10.1500 -138.0300      28.2       342       137        60
OIR    2025130    131400  -10.1500 -138.0400      28.2       342       135        60
OIR    2025130    131400  -10.1500 -138.0500      28.2       342       133        60
OIR    2025130    131400  -10.1500 -138.0600      28.2       342       131        60
OIR    2025130    131400  -10.1500 -138.0700      28.2       342       130        60
OIR    2025130    131400  -10.1500 -138.0800      28.2       342       128        60
OIR    2025130    131400  -10.1500 -138.0900      28.2       342       128        60
OIR    2025130    131400  -10.1500 -138.1000      28.1       342       128        60
OIR    2025130    131400  -10.1500 -138.1100      28.1       342       129        60
OIR    2025130    131400  -10.1500 -138.1200      28.1       342       129        60
OIR    2025130    131400  -10.1500 -138.1300      28.1       342       130        60
OIR    2025130    131400  -10.1500 -138.1400      28.1       342       131        60
OIR    2025130    131400  -10.1500 -138.1500      28.1       342       132        60
OIR    2025130    131400  -10.1500 -138.1600      28.1       342       134        60
OIR    2025130    131400  -10.1500 -138.1700      28.1       342       134        60
OIR    2025130    131400  -10.1500 -138.1800      28.1       342       134        60
OIR    2025130    131400  -10.1500 -138.1900      28.0       342       133        60
OIR    2025130    131400  -10.1500 -138.2000      28.0       341       133        60
OIR    2025130    131400  -10.1500 -138.2100      28.0       341       133        60
OIR    2025130    131400  -10.1500 -138.2200      28.0       341       134        60
OIR    2025130    131400  -10.1500 -138.2300      27.9       341       136        60
OIR    2025130    131400  -10.1500 -138.2400      27.7       340       137        60
OIR    2025130    131400  -10.1500 -138.2500      27.6       339       134        60
OIR    2025130    131400  -10.1500 -138.2600      27.6       339       133        60
OIR    2025130    131400  -10.1500 -138.2700      27.6       339       137        60
OIR    2025130    131400  -10.1500 -138.2800      27.6       339       144        60
OIR    2025130    131400  -10.1500 -138.3100      27.6       339       147        60
OIR    2025130    131400  -10.1500 -138.3200      27.6       339       143        60
OIR    2025130    131400  -10.1500 -138.3300      27.6       339       141        60
OIR    2025130    131400  -10.1500 -138.3400      27.6       339       142        60
OIR    2025130    131400  -10.1500 -138.3500      27.6       339       143        60
OIR    2025130    131400  -10.1500 -138.3600      27.6       339       142        60
OIR    2025130    131400  -10.1500 -138.3700      27.6       338       143        60
OIR    2025130    131400  -10.1500 -138.3800      27.7       338       146        60
OIR    2025130    131400  -10.1500 -138.3900      27.7       338       149        60
OIR    2025130    131400  -10.1500 -138.4500      27.9       338       147        60
OIR    2025130    131400  -10.1500 -138.4600      27.9       339       144        60
OIR    2025130    131400  -10.1500 -138.4700      27.9       339       147        60
OIR    2025130    131400  -10.1600 -136.1600      40.0        53       149        60
OIR    2025130    131400  -10.1600 -136.1700      40.1        53       147        60
OIR    2025130    131400  -10.1600 -136.1800      40.2        53       146        60
OIR    2025130    131400  -10.1600 -136.1900      40.3        53       147        60
OIR    2025130    131400  -10.1600 -136.2000      40.4        53       148        60
OIR    2025130    131400  -10.1600 -136.2100      40.5        53       149        60
OIR    2025130    131400  -10.1600 -136.2600      41.5        52       146        60
OIR    2025130    131400  -10.1600 -136.2700      41.9        51       145        60
OIR    2025130    131400  -10.1600 -136.2800      42.1        51       142        60
OIR    2025130    131400  -10.1600 -136.2900      42.2        51       138        60
OIR    2025130    131400  -10.1600 -136.3000      42.2        51       138        60
OIR    2025130    131400  -10.1600 -136.3100      42.2        51       138        60
OIR    2025130    131400  -10.1600 -136.3200      42.2        51       135        60
OIR    2025130    131400  -10.1600 -136.3300      42.2        51       134        60
OIR    2025130    131400  -10.1600 -136.3400      42.3        51       136        60
OIR    2025130    131400  -10.1600 -136.3500      42.3        51       137        60
OIR    2025130    131400  -10.1600 -136.3600      42.3        51       136        60
OIR    2025130    131400  -10.1600 -136.3700      42.3        51       135        60
OIR    2025130    131400  -10.1600 -136.3800      42.3        51       133        60
OIR    2025130    131400  -10.1600 -136.3900      42.4        51       133        60
OIR    2025130    131400  -10.1600 -136.4000      42.4        51       135        60
OIR    2025130    131400  -10.1600 -136.4100      42.4        50       137        60
OIR    2025130    131400  -10.1600 -136.4200      42.4        50       140        60
OIR    2025130    131400  -10.1600 -136.4300      42.4        50       140        60
OIR    2025130    131400  -10.1600 -136.4400      40.6        48       140        60
OIR    2025130    131400  -10.1600 -136.4500      38.3        46       138        60
OIR    2025130    131400  -10.1600 -136.4600      38.3        46       136        60
OIR    2025130    131400  -10.1600 -136.4700      38.2        46       133        60
OIR    2025130    131400  -10.1600 -136.4800      38.2        46       130        60
OIR    2025130    131400  -10.1600 -136.4900      38.2        46       129        60
OIR    2025130    131400  -10.1600 -136.5000      38.2        46       129        60
OIR    2025130    131400  -10.1600 -136.5100      38.2        47       130        60
OIR    2025130    131400  -10.1600 -136.5200      38.3        47       130        60
OIR    2025130    131400  -10.1600 -136.5300      38.3        47       128        60
OIR    2025130    131400  -10.1600 -136.5400      38.4        47       126        60
OIR    2025130    131400  -10.1600 -136.5500      38.4        47       124        60
OIR    2025130    131400  -10.1600 -136.5600      38.4        47       125        60
OIR    2025130    131400  -10.1600 -136.5700      38.4        47       126        60
OIR    2025130    131400  -10.1600 -136.5800      38.4        47       126        60
OIR    2025130    131400  -10.1600 -136.5900      38.3        47       125        60
OIR    2025130    131400  -10.1600 -136.6000      38.3        47       124        60
OIR    2025130    131400  -10.1600 -136.6100      38.3        47       125        60
OIR    2025130    131400  -10.1600 -136.6200      38.3        47       127        60
OIR    2025130    131400  -10.1600 -136.6300      38.3        47       128        60
OIR    2025130    131400  -10.1600 -136.6400      38.3        47       128        60
OIR    2025130    131400  -10.1600 -136.6500      38.3        47       126        60
OIR    2025130    131400  -10.1600 -136.6600      38.3        46       123        60
OIR    2025130    131400  -10.1600 -136.6700      38.3        46       121        60
OIR    2025130    131400  -10.1600 -136.6800      38.3        46       119        60
OIR    2025130    131400  -10.1600 -136.6900      38.3        46       120        60
OIR    2025130    131400  -10.1600 -136.7000      38.3        46       119        60
OIR    2025130    131400  -10.1600 -136.7100      38.3        46       116        60
OIR    2025130    131400  -10.1600 -136.7200      38.1        46       116        60
OIR    2025130    131400  -10.1600 -136.7300      37.9        45       116        60
OIR    2025130    131400  -10.1600 -136.7400      37.8        45       116        60
OIR    2025130    131400  -10.1600 -136.7500      37.6        45       116        60
OIR    2025130    131400  -10.1600 -136.7600      37.6        45       116        60
OIR    2025130    131400  -10.1600 -136.7700      37.6        45       115        60
OIR    2025130    131400  -10.1600 -136.7800      37.6        44       115        60
OIR    2025130    131400  -10.1600 -136.7900      37.6        44       115        60
OIR    2025130    131400  -10.1600 -136.8000      37.6        44       115        60
OIR    2025130    131400  -10.1600 -136.8100      37.5        44       116        60
OIR    2025130    131400  -10.1600 -136.8200      37.4        43       116        60
OIR    2025130    131400  -10.1600 -136.8300      37.4        43       119        60
OIR    2025130    131400  -10.1600 -136.8400      37.3        42       121        60
OIR    2025130    131400  -10.1600 -136.8500      37.3        42       124        60
OIR    2025130    131400  -10.1600 -136.8600      37.2        41       127        60
OIR    2025130    131400  -10.1600 -136.8700      36.7        35       124        60
OIR    2025130    131400  -10.1600 -136.8800      36.7        32       120        60
OIR    2025130    131400  -10.1600 -136.8900      36.6        31       115        60
OIR    2025130    131400  -10.1600 -136.9000      36.5        31       111        60
OIR    2025130    131400  -10.1600 -136.9100      36.4        30       109        60
OIR    2025130    131400  -10.1600 -136.9200      36.4        30       107        60
OIR    2025130    131400  -10.1600 -136.9300      36.4        30       104        60
OIR    2025130    131400  -10.1600 -136.9400      36.4        31       105        60
OIR    2025130    131400  -10.1600 -136.9500      36.4        31       107        60
OIR    2025130    131400  -10.1600 -136.9600      36.4        31       112        60
OIR    2025130    131400  -10.1600 -136.9700      36.5        31       119        60
OIR    2025130    131400  -10.1600 -136.9800      36.5        31       124        60
OIR    2025130    131400  -10.1600 -136.9900      36.5        31       128        60
OIR    2025130    131400  -10.1600 -137.0000      36.4        32       127        60
OIR    2025130    131400  -10.1600 -137.0100      36.1        32       125        60
OIR    2025130    131400  -10.1600 -137.0200      36.1        32       116        60
OIR    2025130    131400  -10.1600 -137.0300      36.0        32       110        60
OIR    2025130    131400  -10.1600 -137.0400      36.0        32       110        60
OIR    2025130    131400  -10.1600 -137.0500      36.0        32       111        60
OIR    2025130    131400  -10.1600 -137.0600      36.0        32       114        60
OIR    2025130    131400  -10.1600 -137.0700      35.9        33       112        60
OIR    2025130    131400  -10.1600 -137.0800      35.9        33       107        60
OIR    2025130    131400  -10.1600 -137.0900      36.0        33       110        60
OIR    2025130    131400  -10.1600 -137.1000      36.0        33       114        60
OIR    2025130    131400  -10.1600 -137.1100      36.2        33       114        60
OIR    2025130    131400  -10.1600 -137.1200      36.5        34       114        60
OIR    2025130    131400  -10.1600 -137.1300      36.8        34       112        60
OIR    2025130    131400  -10.1600 -137.1400      37.3        34       112        60
OIR    2025130    131400  -10.1600 -137.1500      37.9        35       115        60
OIR    2025130    131400  -10.1600 -137.1600      38.2        35       117        60
OIR    2025130    131400  -10.1600 -137.1700      38.3        35       123        60
OIR    2025130    131400  -10.1600 -137.1800      38.3        35       125        60
OIR    2025130    131400  -10.1600 -137.1900      38.3        35       125        60
OIR    2025130    131400  -10.1600 -137.2000      38.3        35       122        60
OIR    2025130    131400  -10.1600 -137.2100      38.2        35       119        60
OIR    2025130    131400  -10.1600 -137.2200      38.1        34       119        60
OIR    2025130    131400  -10.1600 -137.2300      38.1        34       119        60
OIR    2025130    131400  -10.1600 -137.2400      38.0        34       116        60
OIR    2025130    131400  -10.1600 -137.2500      37.9        33       115        60
OIR    2025130    131400  -10.1600 -137.2600      37.8        32       113        60
OIR    2025130    131400  -10.1600 -137.2700      37.3        29       112        60
OIR    2025130    131400  -10.1600 -137.2800      36.5        21       116        60
OIR    2025130    131400  -10.1600 -137.2900      36.6        18       113        60
OIR    2025130    131400  -10.1600 -137.3000      36.7        18       108        60
OIR    2025130    131400  -10.1600 -137.3100      36.9        17       105        60
OIR    2025130    131400  -10.1600 -137.3200      37.1        16       104        60
OIR    2025130    131400  -10.1600 -137.3300      37.1        16       104        60
OIR    2025130    131400  -10.1600 -137.3400      37.1        16       104        60
OIR    2025130    131400  -10.1600 -137.3500      36.9        15       104        60
OIR    2025130    131400  -10.1600 -137.3600      36.5        15       105        60
OIR    2025130    131400  -10.1600 -137.3700      35.2        13       109        60
OIR    2025130    131400  -10.1600 -137.3800      34.8        13       110        60
OIR    2025130    131400  -10.1600 -137.3900      34.5        13       105        60
OIR    2025130    131400  -10.1600 -137.4000      34.4        13       104        60
OIR    2025130    131400  -10.1600 -137.4100      34.3        13       103        60
OIR    2025130    131400  -10.1600 -137.4200      34.2        13       104        60
OIR    2025130    131400  -10.1600 -137.4300      34.0        13       104        60
OIR    2025130    131400  -10.1600 -137.4400      33.8        12       105        60
OIR    2025130    131400  -10.1600 -137.4500      33.5        12       108        60
OIR    2025130    131400  -10.1600 -137.4600      33.1        11       110        60
OIR    2025130    131400  -10.1600 -137.4700      32.7        10       111        60
OIR    2025130    131400  -10.1600 -137.4800      32.5         9       111        60
OIR    2025130    131400  -10.1600 -137.4900      32.3         8       110        60
OIR    2025130    131400  -10.1600 -137.5000      32.4         8       109        60
OIR    2025130    131400  -10.1600 -137.5100      32.6         7       108        60
OIR    2025130    131400  -10.1600 -137.5200      32.8         7       108        60
OIR    2025130    131400  -10.1600 -137.5300      33.0         7       108        60
OIR    2025130    131400  -10.1600 -137.5400      33.1         7       108        60
OIR    2025130    131400  -10.1600 -137.5500      33.1         7       110        60
OIR    2025130    131400  -10.1600 -137.5600      33.1         6       113        60
OIR    2025130    131400  -10.1600 -137.5700      33.0         5       112        60
OIR    2025130    131400  -10.1600 -137.5800      33.2         6       111        60
OIR    2025130    131400  -10.1600 -137.5900      33.8         6       111        60
OIR    2025130    131400  -10.1600 -137.6000      34.4         6       111        60
OIR    2025130    131400  -10.1600 -137.6100      34.7         7       110        60
OIR    2025130    131400  -10.1600 -137.6200      34.8         7       109        60
OIR    2025130    131400  -10.1600 -137.6300      34.8         7       108        60
OIR    2025130    131400  -10.1600 -137.6400      34.6         7       110        60
OIR    2025130    131400  -10.1600 -137.6500      34.5         6       111        60
OIR    2025130    131400  -10.1600 -137.6600      34.4         6       113        60
OIR    2025130    131400  -10.1600 -137.6700      34.2         6       114        60
OIR    2025130    131400  -10.1600 -137.6800      33.9         6       116        60
OIR    2025130    131400  -10.1600 -137.6900      33.5         5       117        60
OIR    2025130    131400  -10.1600 -137.7000      33.2         5       119        60
OIR    2025130    131400  -10.1600 -137.7100      32.9         4       119        60
OIR    2025130    131400  -10.1600 -137.7200      32.4         3       117        60
OIR    2025130    131400  -10.1600 -137.7300      31.9         1       119        60
OIR    2025130    131400  -10.1600 -137.7400      31.0       357       120        60
OIR    2025130    131400  -10.1600 -137.7500      30.6       355       116        60
OIR    2025130    131400  -10.1600 -137.7600      30.4       355       112        60
OIR    2025130    131400  -10.1600 -137.7700      30.4       355       110        60
OIR    2025130    131400  -10.1600 -137.7800      30.4       354       108        60
OIR    2025130    131400  -10.1600 -137.7900      30.3       354       109        60
OIR    2025130    131400  -10.1600 -137.8000      30.1       354       112        60
OIR    2025130    131400  -10.1600 -137.8100      29.9       354       115        60
OIR    2025130    131400  -10.1600 -137.8200      29.8       354       117        60
OIR    2025130    131400  -10.1600 -137.8300      29.5       353       122        60
OIR    2025130    131400  -10.1600 -137.8400      29.0       353       125        60
OIR    2025130    131400  -10.1600 -137.8500      28.5       353       128        60
OIR    2025130    131400  -10.1600 -137.8600      28.3       352       131        60
OIR    2025130    131400  -10.1600 -137.8700      28.1       352       133        60
OIR    2025130    131400  -10.1600 -137.8800      28.1       352       133        60
OIR    2025130    131400  -10.1600 -137.8900      28.1       352       133        60
OIR    2025130    131400  -10.1600 -137.9000      28.1       352       134        60
OIR    2025130    131400  -10.1600 -137.9100      28.1       352       136        60
OIR    2025130    131400  -10.1600 -137.9200      28.0       352       139        60
OIR    2025130    131400  -10.1600 -137.9300      28.0       351       140        60
OIR    2025130    131400  -10.1600 -137.9400      27.9       351       141        60
OIR    2025130    131400  -10.1600 -137.9500      27.6       350       143        60
OIR    2025130    131400  -10.1600 -137.9600      27.4       349       145        60
OIR    2025130    131400  -10.1600 -137.9700      27.3       348       146        60
OIR    2025130    131400  -10.1600 -137.9800      27.4       347       147        60
OIR    2025130    131400  -10.1600 -137.9900      27.8       344       144        60
OIR    2025130    131400  -10.1600 -138.0000      27.9       343       141        60
OIR    2025130    131400  -10.1600 -138.0100      27.9       343       140        60
OIR    2025130    131400  -10.1600 -138.0200      28.0       343       138        60
OIR    2025130    131400  -10.1600 -138.0300      28.1       342       137        60
OIR    2025130    131400  -10.1600 -138.0400      28.1       342       134        60
OIR    2025130    131400  -10.1600 -138.0500      28.1       342       132        60
OIR    2025130    131400  -10.1600 -138.0600      28.1       342       130        60
OIR    2025130    131400  -10.1600 -138.0700      28.1       342       128        60
OIR    2025130    131400  -10.1600 -138.0800      28.1       342       128        60
OIR    2025130    131400  -10.1600 -138.0900      28.1       342       128        60
OIR    2025130    131400  -10.1600 -138.1000      28.1       342       130        60
OIR    2025130    131400  -10.1600 -138.1100      28.1       342       131        60
OIR    2025130    131400  -10.1600 -138.1200      28.1       342       132        60
OIR    2025130    131400  -10.1600 -138.1300      28.1       342       134        60
OIR    2025130    131400  -10.1600 -138.1400      28.1       342       134        60
OIR    2025130    131400  -10.1600 -138.1500      28.1       342       134        60
OIR    2025130    131400  -10.1600 -138.1600      28.1       342       133        60
OIR    2025130    131400  -10.1600 -138.1700      28.1       342       133        60
OIR    2025130    131400  -10.1600 -138.1800      28.1       342       133        60
OIR    2025130    131400  -10.1600 -138.1900      28.0       342       133        60
OIR    2025130    131400  -10.1600 -138.2000      28.0       341       133        60
OIR    2025130    131400  -10.1600 -138.2100      28.0       341       133        60
OIR    2025130    131400  -10.1600 -138.2200      28.0       341       133        60
OIR    2025130    131400  -10.1600 -138.2300      27.8       341       136        60
OIR    2025130    131400  -10.1600 -138.2400      27.7       340       139        60
OIR    2025130    131400  -10.1600 -138.2500      27.6       339       135        60
OIR    2025130    131400  -10.1600 -138.2600      27.6       339       134        60
OIR    2025130    131400  -10.1600 -138.2700      27.6       339       137        60
OIR    2025130    131400  -10.1600 -138.2800      27.6       339       142        60
OIR    2025130    131400  -10.1600 -138.2900      27.6       339       148        60
OIR    2025130    131400  -10.1600 -138.3100      27.6       339       145        60
OIR    2025130    131400  -10.1600 -138.3200      27.6       339       142        60
OIR    2025130    131400  -10.1600 -138.3300      27.6       339       139        60
OIR    2025130    131400  -10.1600 -138.3400      27.6       339       140        60
OIR    2025130    131400  -10.1600 -138.3500      27.6       339       141        60
OIR    2025130    131400  -10.1600 -138.3600      27.6       339       143        60
OIR    2025130    131400  -10.1600 -138.3700      27.6       339       146        60
OIR    2025130    131400  -10.1700 -136.1700      40.1        53       149        60
OIR    2025130    131400  -10.1700 -136.1800      40.2        53       147        60
OIR    2025130    131400  -10.1700 -136.1900      40.3        53       147        60
OIR    2025130    131400  -10.1700 -136.2000      40.4        53       147        60
OIR    2025130    131400  -10.1700 -136.2600      41.6        51       145        60
OIR    2025130    131400  -10.1700 -136.2700      41.9        51       144        60
OIR    2025130    131400  -10.1700 -136.2800      42.1        51       141        60
OIR    2025130    131400  -10.1700 -136.2900      42.2        51       137        60
OIR    2025130    131400  -10.1700 -136.3000      42.2        51       137        60
OIR    2025130    131400  -10.1700 -136.3100      42.2        51       136        60
OIR    2025130    131400  -10.1700 -136.3200      42.3        51       134        60
OIR    2025130    131400  -10.1700 -136.3300      42.3        51       132        60
OIR    2025130    131400  -10.1700 -136.3400      42.3        51       134        60
OIR    2025130    131400  -10.1700 -136.3500      42.3        51       134        60
OIR    2025130    131400  -10.1700 -136.3600      42.3        51       133        60
OIR    2025130    131400  -10.1700 -136.3700      42.3        51       133        60
OIR    2025130    131400  -10.1700 -136.3800      42.3        51       133        60
OIR    2025130    131400  -10.1700 -136.3900      42.4        51       133        60
OIR    2025130    131400  -10.1700 -136.4000      42.4        51       134        60
OIR    2025130    131400  -10.1700 -136.4100      42.4        50       136        60
OIR    2025130    131400  -10.1700 -136.4200      42.4        50       139        60
OIR    2025130    131400  -10.1700 -136.4300      42.4        50       142        60
OIR    2025130    131400  -10.1700 -136.4400      40.6        48       144        60
OIR    2025130    131400  -10.1700 -136.4500      38.3        46       139        60
OIR    2025130    131400  -10.1700 -136.4600      38.2        46       135        60
OIR    2025130    131400  -10.1700 -136.4700      38.2        46       131        60
OIR    2025130    131400  -10.1700 -136.4800      38.2        46       128        60
OIR    2025130    131400  -10.1700 -136.4900      38.2        46       127        60
OIR    2025130    131400  -10.1700 -136.5000      38.3        46       128        60
OIR    2025130    131400  -10.1700 -136.5100      38.3        46       130        60
OIR    2025130    131400  -10.1700 -136.5200      38.3        47       128        60
OIR    2025130    131400  -10.1700 -136.5300      38.3        47       127        60
OIR    2025130    131400  -10.1700 -136.5400      38.4        47       125        60
OIR    2025130    131400  -10.1700 -136.5500      38.4        47       124        60
OIR    2025130    131400  -10.1700 -136.5600      38.4        47       125        60
OIR    2025130    131400  -10.1700 -136.5700      38.4        47       126        60
OIR    2025130    131400  -10.1700 -136.5800      38.4        47       126        60
OIR    2025130    131400  -10.1700 -136.5900      38.3        47       125        60
OIR    2025130    131400  -10.1700 -136.6000      38.3        47       125        60
OIR    2025130    131400  -10.1700 -136.6100      38.3        47       125        60
OIR    2025130    131400  -10.1700 -136.6200      38.3        47       126        60
OIR    2025130    131400  -10.1700 -136.6300      38.3        47       127        60
OIR    2025130    131400  -10.1700 -136.6400      38.3        47       129        60
OIR    2025130    131400  -10.1700 -136.6500      38.3        46       128        60
OIR    2025130    131400  -10.1700 -136.6600      38.3        46       127        60
OIR    2025130    131400  -10.1700 -136.6700      38.3        46       125        60
OIR    2025130    131400  -10.1700 -136.6800      38.3        46       123        60
OIR    2025130    131400  -10.1700 -136.6900      38.3        46       124        60
OIR    2025130    131400  -10.1700 -136.7000      38.3        46       122        60
OIR    2025130    131400  -10.1700 -136.7100      38.3        46       119        60
OIR    2025130    131400  -10.1700 -136.7200      38.3        46       116        60
OIR    2025130    131400  -10.1700 -136.7300      38.0        45       116        60
OIR    2025130    131400  -10.1700 -136.7400      37.9        45       116        60
OIR    2025130    131400  -10.1700 -136.7500      37.7        45       117        60
OIR    2025130    131400  -10.1700 -136.7600      37.6        45       116        60
OIR    2025130    131400  -10.1700 -136.7700      37.6        44       116        60
OIR    2025130    131400  -10.1700 -136.7800      37.6        44       114        60
OIR    2025130    131400  -10.1700 -136.7900      37.6        44       113        60
OIR    2025130    131400  -10.1700 -136.8000      37.6        44       116        60
OIR    2025130    131400  -10.1700 -136.8100      37.5        44       116        60
OIR    2025130    131400  -10.1700 -136.8200      37.4        43       114        60
OIR    2025130    131400  -10.1700 -136.8300      37.3        42       117        60
OIR    2025130    131400  -10.1700 -136.8400      37.3        42       123        60
OIR    2025130    131400  -10.1700 -136.8500      37.2        41       126        60
OIR    2025130    131400  -10.1700 -136.8600      37.1        39       126        60
OIR    2025130    131400  -10.1700 -136.8700      36.9        35       123        60
OIR    2025130    131400  -10.1700 -136.8800      36.7        33       117        60
OIR    2025130    131400  -10.1700 -136.8900      36.7        32       112        60
OIR    2025130    131400  -10.1700 -136.9000      36.5        31       107        60
OIR    2025130    131400  -10.1700 -136.9100      36.5        31       107        60
OIR    2025130    131400  -10.1700 -136.9200      36.4        30       107        60
OIR    2025130    131400  -10.1700 -136.9300      36.4        30       105        60
OIR    2025130    131400  -10.1700 -136.9400      36.4        31       107        60
OIR    2025130    131400  -10.1700 -136.9500      36.4        31       109        60
OIR    2025130    131400  -10.1700 -136.9600      36.5        31       112        60
OIR    2025130    131400  -10.1700 -136.9700      36.5        31       116        60
OIR    2025130    131400  -10.1700 -136.9800      36.5        31       120        60
OIR    2025130    131400  -10.1700 -136.9900      36.5        31       121        60
OIR    2025130    131400  -10.1700 -137.0000      36.4        32       121        60
OIR    2025130    131400  -10.1700 -137.0100      36.2        32       121        60
OIR    2025130    131400  -10.1700 -137.0200      36.1        32       114        60
OIR    2025130    131400  -10.1700 -137.0300      36.0        32       111        60
OIR    2025130    131400  -10.1700 -137.0400      36.0        32       112        60
OIR    2025130    131400  -10.1700 -137.0500      36.0        32       114        60
OIR    2025130    131400  -10.1700 -137.0600      35.9        33       116        60
OIR    2025130    131400  -10.1700 -137.0700      35.9        33       113        60
OIR    2025130    131400  -10.1700 -137.0800      35.9        33       104        60
OIR    2025130    131400  -10.1700 -137.0900      36.0        33       107        60
OIR    2025130    131400  -10.1700 -137.1000      36.1        33       111        60
OIR    2025130    131400  -10.1700 -137.1100      36.3        33       114        60
OIR    2025130    131400  -10.1700 -137.1200      36.6        34       116        60
OIR    2025130    131400  -10.1700 -137.1300      36.9        34       111        60
OIR    2025130    131400  -10.1700 -137.1400      37.6        35       110        60
OIR    2025130    131400  -10.1700 -137.1500      37.9        35       112        60
OIR    2025130    131400  -10.1700 -137.1600      38.2        35       115        60
OIR    2025130    131400  -10.1700 -137.1700      38.3        35       120        60
OIR    2025130    131400  -10.1700 -137.1800      38.3        35       125        60
OIR    2025130    131400  -10.1700 -137.1900      38.3        35       128        60
OIR    2025130    131400  -10.1700 -137.2000      38.2        35       125        60
OIR    2025130    131400  -10.1700 -137.2100      38.2        35       121        60
OIR    2025130    131400  -10.1700 -137.2200      38.1        34       119        60
OIR    2025130    131400  -10.1700 -137.2300      38.1        34       117        60
OIR    2025130    131400  -10.1700 -137.2400      38.1        34       116        60
OIR    2025130    131400  -10.1700 -137.2500      38.0        33       115        60
OIR    2025130    131400  -10.1700 -137.2600      38.0        33       113        60
OIR    2025130    131400  -10.1700 -137.2700      37.5        29       112        60
OIR    2025130    131400  -10.1700 -137.2800      36.6        21       115        60
OIR    2025130    131400  -10.1700 -137.2900      36.5        18       112        60
OIR    2025130    131400  -10.1700 -137.3000      36.6        18       107        60
OIR    2025130    131400  -10.1700 -137.3100      36.8        17       104        60
OIR    2025130    131400  -10.1700 -137.3200      36.9        16       104        60
OIR    2025130    131400  -10.1700 -137.3300      37.0        16       104        60
OIR    2025130    131400  -10.1700 -137.3400      36.9        15       105        60
OIR    2025130    131400  -10.1700 -137.3500      36.6        15       107        60
OIR    2025130    131400  -10.1700 -137.3600      36.1        14       108        60
OIR    2025130    131400  -10.1700 -137.3700      34.9        13       111        60
OIR    2025130    131400  -10.1700 -137.3800      34.6        13       111        60
OIR    2025130    131400  -10.1700 -137.3900      34.4        13       107        60
OIR    2025130    131400  -10.1700 -137.4000      34.3        13       104        60
OIR    2025130    131400  -10.1700 -137.4100      34.2        13       103        60
OIR    2025130    131400  -10.1700 -137.4200      34.1        13       104        60
OIR    2025130    131400  -10.1700 -137.4300      33.9        13       104        60
OIR    2025130    131400  -10.1700 -137.4400      33.6        12       105        60
OIR    2025130    131400  -10.1700 -137.4500      33.2        12       109        60
OIR    2025130    131400  -10.1700 -137.4600      32.7        11       113        60
OIR    2025130    131400  -10.1700 -137.4700      32.2        10       115        60
OIR    2025130    131400  -10.1700 -137.4800      31.8         9       115        60
OIR    2025130    131400  -10.1700 -137.4900      31.7         8       113        60
OIR    2025130    131400  -10.1700 -137.5000      31.5         8       109        60
OIR    2025130    131400  -10.1700 -137.5100      31.5         7       107        60
OIR    2025130    131400  -10.1700 -137.5200      31.6         7       107        60
OIR    2025130    131400  -10.1700 -137.5300      31.7         7       105        60
OIR    2025130    131400  -10.1700 -137.5400      31.9         6       105        60
OIR    2025130    131400  -10.1700 -137.5500      32.3         6       109        60
OIR    2025130    131400  -10.1700 -137.5600      32.4         6       113        60
OIR    2025130    131400  -10.1700 -137.5700      32.1         5       115        60
OIR    2025130    131400  -10.1700 -137.5800      31.9         5       116        60
OIR    2025130    131400  -10.1700 -137.5900      32.1         5       116        60
OIR    2025130    131400  -10.1700 -137.6000      32.5         6       116        60
OIR    2025130    131400  -10.1700 -137.6100      33.0         6       114        60
OIR    2025130    131400  -10.1700 -137.6200      33.6         6       113        60
OIR    2025130    131400  -10.1700 -137.6300      34.1         6       111        60
OIR    2025130    131400  -10.1700 -137.6400      34.3         6       113        60
OIR    2025130    131400  -10.1700 -137.6500      34.4         6       114        60
OIR    2025130    131400  -10.1700 -137.6600      34.2         6       114        60
OIR    2025130    131400  -10.1700 -137.6700      34.0         6       115        60
OIR    2025130    131400  -10.1700 -137.6800      33.6         6       116        60
OIR    2025130    131400  -10.1700 -137.6900      33.1         5       116        60
OIR    2025130    131400  -10.1700 -137.7000      32.7         5       116        60
OIR    2025130    131400  -10.1700 -137.7100      32.3         4       116        60
OIR    2025130    131400  -10.1700 -137.7200      31.9         3       116        60
OIR    2025130    131400  -10.1700 -137.7300      31.4         1       119        60
OIR    2025130    131400  -10.1700 -137.7400      30.4       357       122        60
OIR    2025130    131400  -10.1700 -137.7500      30.1       355       116        60
OIR    2025130    131400  -10.1700 -137.7600      29.9       355       113        60
OIR    2025130    131400  -10.1700 -137.7700      29.9       355       110        60
OIR    2025130    131400  -10.1700 -137.7800      29.8       354       108        60
OIR    2025130    131400  -10.1700 -137.7900      29.6       354       111        60
OIR    2025130    131400  -10.1700 -137.8000      29.4       354       113        60
OIR    2025130    131400  -10.1700 -137.8100      29.3       354       116        60
OIR    2025130    131400  -10.1700 -137.8200      29.2       354       120        60
OIR    2025130    131400  -10.1700 -137.8300      28.9       353       125        60
OIR    2025130    131400  -10.1700 -137.8400      28.6       353       128        60
OIR    2025130    131400  -10.1700 -137.8500      28.3       353       131        60
OIR    2025130    131400  -10.1700 -137.8600      28.2       352       134        60
OIR    2025130    131400  -10.1700 -137.8700      28.1       352       137        60
OIR    2025130    131400  -10.1700 -137.8800      28.1       352       137        60
OIR    2025130    131400  -10.1700 -137.8900      28.1       352       137        60
OIR    2025130    131400  -10.1700 -137.9000      28.0       352       137        60
OIR    2025130    131400  -10.1700 -137.9100      28.0       352       138        60
OIR    2025130    131400  -10.1700 -137.9200      28.0       352       139        60
OIR    2025130    131400  -10.1700 -137.9300      27.8       351       141        60
OIR    2025130    131400  -10.1700 -137.9400      27.6       351       142        60
OIR    2025130    131400  -10.1700 -137.9500      27.2       350       145        60
OIR    2025130    131400  -10.1700 -137.9600      26.9       349       150        60
OIR    2025130    131400  -10.1700 -137.9700      26.8       348       149        60
OIR    2025130    131400  -10.1700 -137.9800      27.0       347       147        60
OIR    2025130    131400  -10.1700 -137.9900      27.4       345       144        60
OIR    2025130    131400  -10.1700 -138.0000      27.6       344       141        60
OIR    2025130    131400  -10.1700 -138.0100      27.8       343       140        60
OIR    2025130    131400  -10.1700 -138.0200      28.0       343       138        60
OIR    2025130    131400  -10.1700 -138.0300      28.0       342       136        60
OIR    2025130    131400  -10.1700 -138.0400      28.1       342       134        60
OIR    2025130    131400  -10.1700 -138.0500      28.1       342       130        60
OIR    2025130    131400  -10.1700 -138.0600      28.1       342       128        60
OIR    2025130    131400  -10.1700 -138.0700      28.1       342       127        60
OIR    2025130    131400  -10.1700 -138.0800      28.1       342       128        60
OIR    2025130    131400  -10.1700 -138.0900      28.1       342       129        60
OIR    2025130    131400  -10.1700 -138.1000      28.1       342       132        60
OIR    2025130    131400  -10.1700 -138.1100      28.1       342       134        60
OIR    2025130    131400  -10.1700 -138.1200      28.1       342       135        60
OIR    2025130    131400  -10.1700 -138.1300      28.1       342       136        60
OIR    2025130    131400  -10.1700 -138.1400      28.1       342       136        60
OIR    2025130    131400  -10.1700 -138.1500      28.1       342       134        60
OIR    2025130    131400  -10.1700 -138.1600      28.1       342       132        60
OIR    2025130    131400  -10.1700 -138.1700      28.1       342       132        60
OIR    2025130    131400  -10.1700 -138.1800      28.0       342       133        60
OIR    2025130    131400  -10.1700 -138.1900      28.0       342       133        60
OIR    2025130    131400  -10.1700 -138.2000      28.0       342       133        60
OIR    2025130    131400  -10.1700 -138.2100      28.0       341       132        60
OIR    2025130    131400  -10.1700 -138.2200      27.9       341       133        60
OIR    2025130    131400  -10.1700 -138.2300      27.8       341       137        60
OIR    2025130    131400  -10.1700 -138.2400      27.6       340       140        60
OIR    2025130    131400  -10.1700 -138.2500      27.6       339       137        60
OIR    2025130    131400  -10.1700 -138.2600      27.6       339       136        60
OIR    2025130    131400  -10.1700 -138.2700      27.6       339       137        60
OIR    2025130    131400  -10.1700 -138.2800      27.6       339       141        60
OIR    2025130    131400  -10.1700 -138.2900      27.6       339       146        60
OIR    2025130    131400  -10.1700 -138.3000      27.5       339       146        60
OIR    2025130    131400  -10.1700 -138.3100      27.5       339       143        60
OIR    2025130    131400  -10.1700 -138.3200      27.5       339       140        60
OIR    2025130    131400  -10.1700 -138.3300      27.5       339       138        60
OIR    2025130    131400  -10.1700 -138.3400      27.5       339       138        60
OIR    2025130    131400  -10.1700 -138.3500      27.5       339       139        60
OIR    2025130    131400  -10.1700 -138.3600      27.5       339       144        60
OIR    2025130    131400  -10.1800 -136.1800      40.2        53       148        60
OIR    2025130    131400  -10.1800 -136.1900      40.3        53       148        60
OIR    2025130    131400  -10.1800 -136.2000      40.4        53       148        60
OIR    2025130    131400  -10.1800 -136.2600      41.7        51       144        60
OIR    2025130    131400  -10.1800 -136.2700      41.9        51       142        60
OIR    2025130    131400  -10.1800 -136.2800      42.1        51       139        60
OIR    2025130    131400  -10.1800 -136.2900      42.2        51       136        60
OIR    2025130    131400  -10.1800 -136.3000      42.2        51       135        60
OIR    2025130    131400  -10.1800 -136.3100      42.3        51       135        60
OIR    2025130    131400  -10.1800 -136.3200      42.3        51       134        60
OIR    2025130    131400  -10.1800 -136.3300      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3400      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3500      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3600      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3700      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3800      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.3900      42.3        51       133        60
OIR    2025130    131400  -10.1800 -136.4000      42.4        51       133        60
OIR    2025130    131400  -10.1800 -136.4100      42.4        50       135        60
OIR    2025130    131400  -10.1800 -136.4200      42.4        50       136        60
OIR    2025130    131400  -10.1800 -136.4300      42.3        50       140        60
OIR    2025130    131400  -10.1800 -136.4400      40.3        48       143        60
OIR    2025130    131400  -10.1800 -136.4500      38.2        46       139        60
OIR    2025130    131400  -10.1800 -136.4600      38.2        46       135        60
OIR    2025130    131400  -10.1800 -136.4700      38.2        46       131        60
OIR    2025130    131400  -10.1800 -136.4800      38.2        46       127        60
OIR    2025130    131400  -10.1800 -136.4900      38.2        46       126        60
OIR    2025130    131400  -10.1800 -136.5000      38.3        46       126        60
OIR    2025130    131400  -10.1800 -136.5100      38.3        46       127        60
OIR    2025130    131400  -10.1800 -136.5200      38.3        46       126        60
OIR    2025130    131400  -10.1800 -136.5300      38.3        47       125        60
OIR    2025130    131400  -10.1800 -136.5400      38.3        47       124        60
OIR    2025130    131400  -10.1800 -136.5500      38.4        47       124        60
OIR    2025130    131400  -10.1800 -136.5600      38.4        47       126        60
OIR    2025130    131400  -10.1800 -136.5700      38.4        47       127        60
OIR    2025130    131400  -10.1800 -136.5800      38.4        47       126        60
OIR    2025130    131400  -10.1800 -136.5900      38.3        47       126        60
OIR    2025130    131400  -10.1800 -136.6000      38.3        47       126        60
OIR    2025130    131400  -10.1800 -136.6100      38.3        47       126        60
OIR    2025130    131400  -10.1800 -136.6200      38.3        47       126        60
OIR    2025130    131400  -10.1800 -136.6300      38.3        47       127        60
OIR    2025130    131400  -10.1800 -136.6400      38.4        46       129        60
OIR    2025130    131400  -10.1800 -136.6500      38.4        46       130        60
OIR    2025130    131400  -10.1800 -136.6600      38.4        46       131        60
OIR    2025130    131400  -10.1800 -136.6700      38.4        46       129        60
OIR    2025130    131400  -10.1800 -136.6800      38.3        46       128        60
OIR    2025130    131400  -10.1800 -136.6900      38.3        46       128        60
OIR    2025130    131400  -10.1800 -136.7000      38.3        46       127        60
OIR    2025130    131400  -10.1800 -136.7100      38.3        46       124        60
OIR    2025130    131400  -10.1800 -136.7200      38.3        46       121        60
OIR    2025130    131400  -10.1800 -136.7300      38.1        45       117        60
OIR    2025130    131400  -10.1800 -136.7400      37.9        45       116        60
OIR    2025130    131400  -10.1800 -136.7500      37.7        45       117        60
OIR    2025130    131400  -10.1800 -136.7600      37.6        45       116        60
OIR    2025130    131400  -10.1800 -136.7700      37.6        44       116        60
OIR    2025130    131400  -10.1800 -136.7800      37.6        44       115        60
OIR    2025130    131400  -10.1800 -136.7900      37.6        44       115        60
OIR    2025130    131400  -10.1800 -136.8000      37.5        44       117        60
OIR    2025130    131400  -10.1800 -136.8100      37.5        43       119        60
OIR    2025130    131400  -10.1800 -136.8200      37.3        42       116        60
OIR    2025130    131400  -10.1800 -136.8300      37.2        41       116        60
OIR    2025130    131400  -10.1800 -136.8400      37.3        41       121        60
OIR    2025130    131400  -10.1800 -136.8500      37.3        40       124        60
OIR    2025130    131400  -10.1800 -136.8600      37.2        39       128        60
OIR    2025130    131400  -10.1800 -136.8700      36.9        35       123        60
OIR    2025130    131400  -10.1800 -136.8800      36.8        34       116        60
OIR    2025130    131400  -10.1800 -136.8900      36.7        32       113        60
OIR    2025130    131400  -10.1800 -136.9000      36.6        31       109        60
OIR    2025130    131400  -10.1800 -136.9100      36.5        31       110        60
OIR    2025130    131400  -10.1800 -136.9200      36.4        31       110        60
OIR    2025130    131400  -10.1800 -136.9300      36.4        31       108        60
OIR    2025130    131400  -10.1800 -136.9400      36.4        31       109        60
OIR    2025130    131400  -10.1800 -136.9500      36.4        31       112        60
OIR    2025130    131400  -10.1800 -136.9600      36.4        31       113        60
OIR    2025130    131400  -10.1800 -136.9700      36.5        31       114        60
OIR    2025130    131400  -10.1800 -136.9800      36.5        31       116        60
OIR    2025130    131400  -10.1800 -136.9900      36.5        31       117        60
OIR    2025130    131400  -10.1800 -137.0000      36.4        32       119        60
OIR    2025130    131400  -10.1800 -137.0100      36.2        32       119        60
OIR    2025130    131400  -10.1800 -137.0200      36.0        32       116        60
OIR    2025130    131400  -10.1800 -137.0300      36.0        32       114        60
OIR    2025130    131400  -10.1800 -137.0400      36.0        32       114        60
OIR    2025130    131400  -10.1800 -137.0500      35.8        32       116        60
OIR    2025130    131400  -10.1800 -137.0600      35.6        33       119        60
OIR    2025130    131400  -10.1800 -137.0700      35.6        33       115        60
OIR    2025130    131400  -10.1800 -137.0800      35.8        33       105        60
OIR    2025130    131400  -10.1800 -137.0900      36.0        33       108        60
OIR    2025130    131400  -10.1800 -137.1000      36.1        33       110        60
OIR    2025130    131400  -10.1800 -137.1100      36.3        33       113        60
OIR    2025130    131400  -10.1800 -137.1200      36.7        34       114        60
OIR    2025130    131400  -10.1800 -137.1300      36.8        34       112        60
OIR    2025130    131400  -10.1800 -137.1400      37.6        35       111        60
OIR    2025130    131400  -10.1800 -137.1500      37.8        35       112        60
OIR    2025130    131400  -10.1800 -137.1600      38.0        35       115        60
OIR    2025130    131400  -10.1800 -137.1700      38.2        35       119        60
OIR    2025130    131400  -10.1800 -137.1800      38.3        35       122        60
OIR    2025130    131400  -10.1800 -137.1900      38.3        35       125        60
OIR    2025130    131400  -10.1800 -137.2000      38.2        35       125        60
OIR    2025130    131400  -10.1800 -137.2100      38.1        34       125        60
OIR    2025130    131400  -10.1800 -137.2200      38.0        34       123        60
OIR    2025130    131400  -10.1800 -137.2300      38.1        34       120        60
OIR    2025130    131400  -10.1800 -137.2400      38.1        34       116        60
OIR    2025130    131400  -10.1800 -137.2500      38.0        33       114        60
OIR    2025130    131400  -10.1800 -137.2600      38.0        33       113        60
OIR    2025130    131400  -10.1800 -137.2700      37.5        29       112        60
OIR    2025130    131400  -10.1800 -137.2800      36.6        22       113        60
OIR    2025130    131400  -10.1800 -137.2900      36.5        19       112        60
OIR    2025130    131400  -10.1800 -137.3000      36.5        17       109        60
OIR    2025130    131400  -10.1800 -137.3100      36.6        17       107        60
OIR    2025130    131400  -10.1800 -137.3200      36.6        16       105        60
OIR    2025130    131400  -10.1800 -137.3300      36.6        16       107        60
OIR    2025130    131400  -10.1800 -137.3400      36.4        15       109        60
OIR    2025130    131400  -10.1800 -137.3500      36.0        15       111        60
OIR    2025130    131400  -10.1800 -137.3600      35.3        14       113        60
OIR    2025130    131400  -10.1800 -137.3700      34.6        13       114        60
OIR    2025130    131400  -10.1800 -137.3800      34.4        13       114        60
OIR    2025130    131400  -10.1800 -137.3900      34.2        13       108        60
OIR    2025130    131400  -10.1800 -137.4000      34.2        13       105        60
OIR    2025130    131400  -10.1800 -137.4100      34.1        13       104        60
OIR    2025130    131400  -10.1800 -137.4200      33.9        13       105        60
OIR    2025130    131400  -10.1800 -137.4300      33.7        13       105        60
OIR    2025130    131400  -10.1800 -137.4400      33.2        12       108        60
OIR    2025130    131400  -10.1800 -137.4500      32.6        12       110        60
OIR    2025130    131400  -10.1800 -137.4600      32.0        11       114        60
OIR    2025130    131400  -10.1800 -137.4700      31.5        10       116        60
OIR    2025130    131400  -10.1800 -137.4800      31.2         9       116        60
OIR    2025130    131400  -10.1800 -137.4900      31.2         8       114        60
OIR    2025130    131400  -10.1800 -137.5000      31.1         7       110        60
OIR    2025130    131400  -10.1800 -137.5100      31.1         7       110        60
OIR    2025130    131400  -10.1800 -137.5200      31.3         7       111        60
OIR    2025130    131400  -10.1800 -137.5300      31.5         7       109        60
OIR    2025130    131400  -10.1800 -137.5400      31.5         6       108        60
OIR    2025130    131400  -10.1800 -137.5500      31.4         6       110        60
OIR    2025130    131400  -10.1800 -137.5600      31.2         5       113        60
OIR    2025130    131400  -10.1800 -137.5700      30.7         5       115        60
OIR    2025130    131400  -10.1800 -137.5800      30.4         5       116        60
OIR    2025130    131400  -10.1800 -137.5900      30.3         5       119        60
OIR    2025130    131400  -10.1800 -137.6000      30.4         5       120        60
OIR    2025130    131400  -10.1800 -137.6100      30.5         5       116        60
OIR    2025130    131400  -10.1800 -137.6200      30.7         5       116        60
OIR    2025130    131400  -10.1800 -137.6300      31.3         5       116        60
OIR    2025130    131400  -10.1800 -137.6400      32.3         6       117        60
OIR    2025130    131400  -10.1800 -137.6500      33.2         6       120        60
OIR    2025130    131400  -10.1800 -137.6600      33.7         6       119        60
OIR    2025130    131400  -10.1800 -137.6700      33.5         6       117        60
OIR    2025130    131400  -10.1800 -137.6800      33.0         6       117        60
OIR    2025130    131400  -10.1800 -137.6900      32.4         5       116        60
OIR    2025130    131400  -10.1800 -137.7000      31.9         5       116        60
OIR    2025130    131400  -10.1800 -137.7100      31.6         4       116        60
OIR    2025130    131400  -10.1800 -137.7200      31.3         3       116        60
OIR    2025130    131400  -10.1800 -137.7300      30.9         1       119        60
OIR    2025130    131400  -10.1800 -137.7400      29.9       357       121        60
OIR    2025130    131400  -10.1800 -137.7500      29.6       356       119        60
OIR    2025130    131400  -10.1800 -137.7600      29.5       355       116        60
OIR    2025130    131400  -10.1800 -137.7700      29.4       355       114        60
OIR    2025130    131400  -10.1800 -137.7800      29.3       354       112        60
OIR    2025130    131400  -10.1800 -137.7900      29.1       354       113        60
OIR    2025130    131400  -10.1800 -137.8000      29.0       354       115        60
OIR    2025130    131400  -10.1800 -137.8100      29.0       354       117        60
OIR    2025130    131400  -10.1800 -137.8200      28.9       354       122        60
OIR    2025130    131400  -10.1800 -137.8300      28.7       354       127        60
OIR    2025130    131400  -10.1800 -137.8400      28.5       353       131        60
OIR    2025130    131400  -10.1800 -137.8500      28.2       353       133        60
OIR    2025130    131400  -10.1800 -137.8600      28.1       353       135        60
OIR    2025130    131400  -10.1800 -137.8700      28.1       352       137        60
OIR    2025130    131400  -10.1800 -137.8800      28.0       352       137        60
OIR    2025130    131400  -10.1800 -137.8900      28.0       352       136        60
OIR    2025130    131400  -10.1800 -137.9000      27.9       352       136        60
OIR    2025130    131400  -10.1800 -137.9100      27.9       352       136        60
OIR    2025130    131400  -10.1800 -137.9200      27.7       352       137        60
OIR    2025130    131400  -10.1800 -137.9300      27.5       351       137        60
OIR    2025130    131400  -10.1800 -137.9400      27.1       350       138        60
OIR    2025130    131400  -10.1800 -137.9500      26.7       349       141        60
OIR    2025130    131400  -10.1800 -137.9600      26.5       348       144        60
OIR    2025130    131400  -10.1800 -137.9700      26.4       348       144        60
OIR    2025130    131400  -10.1800 -137.9800      26.6       346       144        60
OIR    2025130    131400  -10.1800 -137.9900      27.0       345       142        60
OIR    2025130    131400  -10.1800 -138.0000      27.4       344       140        60
OIR    2025130    131400  -10.1800 -138.0100      27.7       343       138        60
OIR    2025130    131400  -10.1800 -138.0200      27.9       343       137        60
OIR    2025130    131400  -10.1800 -138.0300      28.0       343       135        60
OIR    2025130    131400  -10.1800 -138.0400      28.0       342       132        60
OIR    2025130    131400  -10.1800 -138.0500      28.1       342       130        60
OIR    2025130    131400  -10.1800 -138.0600      28.1       342       128        60
OIR    2025130    131400  -10.1800 -138.0700      28.1       342       128        60
OIR    2025130    131400  -10.1800 -138.0800      28.1       342       129        60
OIR    2025130    131400  -10.1800 -138.0900      28.1       342       130        60
OIR    2025130    131400  -10.1800 -138.1000      28.1       342       133        60
OIR    2025130    131400  -10.1800 -138.1100      28.1       342       135        60
OIR    2025130    131400  -10.1800 -138.1200      28.1       342       136        60
OIR    2025130    131400  -10.1800 -138.1300      28.1       342       136        60
OIR    2025130    131400  -10.1800 -138.1400      28.1       342       135        60
OIR    2025130    131400  -10.1800 -138.1500      28.1       342       135        60
OIR    2025130    131400  -10.1800 -138.1600      28.1       342       134        60
OIR    2025130    131400  -10.1800 -138.1700      28.1       342       134        60
OIR    2025130    131400  -10.1800 -138.1800      28.0       342       134        60
OIR    2025130    131400  -10.1800 -138.1900      28.0       342       134        60
OIR    2025130    131400  -10.1800 -138.2000      28.0       342       133        60
OIR    2025130    131400  -10.1800 -138.2100      28.0       341       132        60
OIR    2025130    131400  -10.1800 -138.2200      27.9       341       133        60
OIR    2025130    131400  -10.1800 -138.2300      27.8       340       136        60
OIR    2025130    131400  -10.1800 -138.2400      27.7       340       140        60
OIR    2025130    131400  -10.1800 -138.2500      27.6       339       139        60
OIR    2025130    131400  -10.1800 -138.2600      27.6       339       138        60
OIR    2025130    131400  -10.1800 -138.2700      27.6       339       138        60
OIR    2025130    131400  -10.1800 -138.2800      27.6       339       140        60
OIR    2025130    131400  -10.1800 -138.2900      27.5       339       142        60
OIR    2025130    131400  -10.1800 -138.3000      27.5       339       143        60
OIR    2025130    131400  -10.1800 -138.3100      27.5       339       143        60
OIR    2025130    131400  -10.1800 -138.3200      27.5       339       141        60
OIR    2025130    131400  -10.1800 -138.3300      27.5       339       138        60
OIR    2025130    131400  -10.1800 -138.3400      27.5       339       137        60
OIR    2025130    131400  -10.1800 -138.3500      27.5       339       136        60
OIR    2025130    131400  -10.1800 -138.3600      27.5       339       143        60
OIR    2025130    131400  -10.1900 -136.1400      39.1        53       149        60
OIR    2025130    131400  -10.1900 -136.1500      39.3        53       148        60
OIR    2025130    131400  -10.1900 -136.1600      39.7        53       149        60
OIR    2025130    131400  -10.1900 -136.2500      41.5        51       146        60
OIR    2025130    131400  -10.1900 -136.2600      41.8        51       143        60
OIR    2025130    131400  -10.1900 -136.2700      42.0        51       140        60
OIR    2025130    131400  -10.1900 -136.2800      42.1        51       138        60
OIR    2025130    131400  -10.1900 -136.2900      42.2        51       135        60
OIR    2025130    131400  -10.1900 -136.3000      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.3100      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.3200      42.3        51       135        60
OIR    2025130    131400  -10.1900 -136.3300      42.3        51       136        60
OIR    2025130    131400  -10.1900 -136.3400      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.3500      42.3        51       133        60
OIR    2025130    131400  -10.1900 -136.3600      42.3        51       133        60
OIR    2025130    131400  -10.1900 -136.3700      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.3800      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.3900      42.3        51       134        60
OIR    2025130    131400  -10.1900 -136.4000      42.3        51       133        60
OIR    2025130    131400  -10.1900 -136.4100      42.4        50       133        60
OIR    2025130    131400  -10.1900 -136.4200      42.4        50       133        60
OIR    2025130    131400  -10.1900 -136.4300      42.1        50       136        60
OIR    2025130    131400  -10.1900 -136.4400      39.7        47       139        60
OIR    2025130    131400  -10.1900 -136.4500      38.2        46       138        60
OIR    2025130    131400  -10.1900 -136.4600      38.2        46       136        60
OIR    2025130    131400  -10.1900 -136.4700      38.2        46       132        60
OIR    2025130    131400  -10.1900 -136.4800      38.2        46       128        60
OIR    2025130    131400  -10.1900 -136.4900      38.2        46       125        60
OIR    2025130    131400  -10.1900 -136.5000      38.3        46       124        60
OIR    2025130    131400  -10.1900 -136.5100      38.3        46       123        60
OIR    2025130    131400  -10.1900 -136.5200      38.3        46       122        60
OIR    2025130    131400  -10.1900 -136.5300      38.3        46       122        60
OIR    2025130    131400  -10.1900 -136.5400      38.3        47       124        60
OIR    2025130    131400  -10.1900 -136.5500      38.4        47       126        60
OIR    2025130    131400  -10.1900 -136.5600      38.4        47       127        60
OIR    2025130    131400  -10.1900 -136.5700      38.4        47       127        60
OIR    2025130    131400  -10.1900 -136.5800      38.4        47       127        60
OIR    2025130    131400  -10.1900 -136.5900      38.4        47       128        60
OIR    2025130    131400  -10.1900 -136.6000      38.3        47       128        60
OIR    2025130    131400  -10.1900 -136.6100      38.3        47       128        60
OIR    2025130    131400  -10.1900 -136.6200      38.3        46       128        60
OIR    2025130    131400  -10.1900 -136.6300      38.4        46       128        60
OIR    2025130    131400  -10.1900 -136.6400      38.4        46       129        60
OIR    2025130    131400  -10.1900 -136.6500      38.4        46       132        60
OIR    2025130    131400  -10.1900 -136.6600      38.4        46       134        60
OIR    2025130    131400  -10.1900 -136.6700      38.4        46       134        60
OIR    2025130    131400  -10.1900 -136.6800      38.4        46       134        60
OIR    2025130    131400  -10.1900 -136.6900      38.4        46       133        60
OIR    2025130    131400  -10.1900 -136.7000      38.3        46       133        60
OIR    2025130    131400  -10.1900 -136.7100      38.3        46       131        60
OIR    2025130    131400  -10.1900 -136.7200      38.3        46       127        60
OIR    2025130    131400  -10.1900 -136.7300      38.2        46       122        60
OIR    2025130    131400  -10.1900 -136.7400      37.9        45       119        60
OIR    2025130    131400  -10.1900 -136.7500      37.7        45       120        60
OIR    2025130    131400  -10.1900 -136.7600      37.6        45       117        60
OIR    2025130    131400  -10.1900 -136.7700      37.6        44       116        60
OIR    2025130    131400  -10.1900 -136.7800      37.5        44       116        60
OIR    2025130    131400  -10.1900 -136.7900      37.5        44       116        60
OIR    2025130    131400  -10.1900 -136.8000      37.4        43       120        60
OIR    2025130    131400  -10.1900 -136.8100      37.3        42       121        60
OIR    2025130    131400  -10.1900 -136.8200      37.2        41       117        60
OIR    2025130    131400  -10.1900 -136.8300      37.1        41       116        60
OIR    2025130    131400  -10.1900 -136.8400      37.2        40       117        60
OIR    2025130    131400  -10.1900 -136.8500      37.3        40       123        60
OIR    2025130    131400  -10.1900 -136.8600      37.3        39       131        60
OIR    2025130    131400  -10.1900 -136.8700      36.8        36       123        60
OIR    2025130    131400  -10.1900 -136.8800      36.7        34       115        60
OIR    2025130    131400  -10.1900 -136.8900      36.8        32       113        60
OIR    2025130    131400  -10.1900 -136.9000      36.7        31       111        60
OIR    2025130    131400  -10.1900 -136.9100      36.6        31       114        60
OIR    2025130    131400  -10.1900 -136.9200      36.5        31       114        60
OIR    2025130    131400  -10.1900 -136.9300      36.3        31       110        60
OIR    2025130    131400  -10.1900 -136.9400      36.3        31       111        60
OIR    2025130    131400  -10.1900 -136.9500      36.3        31       114        60
OIR    2025130    131400  -10.1900 -136.9600      36.4        31       114        60
OIR    2025130    131400  -10.1900 -136.9700      36.4        31       111        60
OIR    2025130    131400  -10.1900 -136.9800      36.4        31       112        60
OIR    2025130    131400  -10.1900 -136.9900      36.4        31       114        60
OIR    2025130    131400  -10.1900 -137.0000      36.3        32       116        60
OIR    2025130    131400  -10.1900 -137.0100      36.2        32       117        60
OIR    2025130    131400  -10.1900 -137.0200      36.0        32       119        60
OIR    2025130    131400  -10.1900 -137.0300      36.0        32       117        60
OIR    2025130    131400  -10.1900 -137.0400      35.9        32       116        60
OIR    2025130    131400  -10.1900 -137.0500      35.5        32       117        60
OIR    2025130    131400  -10.1900 -137.0600      35.4        32       121        60
OIR    2025130    131400  -10.1900 -137.0700      35.3        33       116        60
OIR    2025130    131400  -10.1900 -137.0800      35.5        33       108        60
OIR    2025130    131400  -10.1900 -137.0900      36.0        33       108        60
OIR    2025130    131400  -10.1900 -137.1000      36.0        33       109        60
OIR    2025130    131400  -10.1900 -137.1100      36.1        33       111        60
OIR    2025130    131400  -10.1900 -137.1200      36.5        34       113        60
OIR    2025130    131400  -10.1900 -137.1300      36.7        34       113        60
OIR    2025130    131400  -10.1900 -137.1400      37.4        35       113        60
OIR    2025130    131400  -10.1900 -137.1500      37.7        35       113        60
OIR    2025130    131400  -10.1900 -137.1600      37.7        35       115        60
OIR    2025130    131400  -10.1900 -137.1700      38.0        35       116        60
OIR    2025130    131400  -10.1900 -137.1800      38.1        35       119        60
OIR    2025130    131400  -10.1900 -137.1900      38.2        35       122        60
OIR    2025130    131400  -10.1900 -137.2000      38.1        35       125        60
OIR    2025130    131400  -10.1900 -137.2100      38.0        34       128        60
OIR    2025130    131400  -10.1900 -137.2200      37.9        34       126        60
OIR    2025130    131400  -10.1900 -137.2300      38.0        34       122        60
OIR    2025130    131400  -10.1900 -137.2400      38.1        33       116        60
OIR    2025130    131400  -10.1900 -137.2500      38.1        33       113        60
OIR    2025130    131400  -10.1900 -137.2600      38.0        32       112        60
OIR    2025130    131400  -10.1900 -137.2700      37.3        28       111        60
OIR    2025130    131400  -10.1900 -137.2800      36.5        22       112        60
OIR    2025130    131400  -10.1900 -137.2900      36.2        19       112        60
OIR    2025130    131400  -10.1900 -137.3000      36.1        18       111        60
OIR    2025130    131400  -10.1900 -137.3100      36.1        17       110        60
OIR    2025130    131400  -10.1900 -137.3200      35.9        16       109        60
OIR    2025130    131400  -10.1900 -137.3300      35.5        16       110        60
OIR    2025130    131400  -10.1900 -137.3400      35.2        15       112        60
OIR    2025130    131400  -10.1900 -137.3500      34.8        14       116        60
OIR    2025130    131400  -10.1900 -137.3600      34.5        13       117        60
OIR    2025130    131400  -10.1900 -137.3700      34.2        13       117        60
OIR    2025130    131400  -10.1900 -137.3800      34.1        13       116        60
OIR    2025130    131400  -10.1900 -137.3900      34.0        13       110        60
OIR    2025130    131400  -10.1900 -137.4000      33.9        13       107        60
OIR    2025130    131400  -10.1900 -137.4100      33.8        13       108        60
OIR    2025130    131400  -10.1900 -137.4200      33.6        13       108        60
OIR    2025130    131400  -10.1900 -137.4300      33.2        13       108        60
OIR    2025130    131400  -10.1900 -137.4400      32.6        12       110        60
OIR    2025130    131400  -10.1900 -137.4500      31.8        11       112        60
OIR    2025130    131400  -10.1900 -137.4600      31.2        10       115        60
OIR    2025130    131400  -10.1900 -137.4700      30.9         9       116        60
OIR    2025130    131400  -10.1900 -137.4800      30.7         8       116        60
OIR    2025130    131400  -10.1900 -137.4900      30.6         8       115        60
OIR    2025130    131400  -10.1900 -137.5000      30.5         7       112        60
OIR    2025130    131400  -10.1900 -137.5100      30.4         7       112        60
OIR    2025130    131400  -10.1900 -137.5200      30.3         6       115        60
OIR    2025130    131400  -10.1900 -137.5300      30.2         6       113        60
OIR    2025130    131400  -10.1900 -137.5400      30.2         6       111        60
OIR    2025130    131400  -10.1900 -137.5500      30.3         6       111        60
OIR    2025130    131400  -10.1900 -137.5600      30.3         5       113        60
OIR    2025130    131400  -10.1900 -137.5700      30.3         5       114        60
OIR    2025130    131400  -10.1900 -137.5800      30.3         5       116        60
OIR    2025130    131400  -10.1900 -137.5900      30.3         5       122        60
OIR    2025130    131400  -10.1900 -137.6000      30.3         5       124        60
OIR    2025130    131400  -10.1900 -137.6100      30.3         5       121        60
OIR    2025130    131400  -10.1900 -137.6200      30.3         5       121        60
OIR    2025130    131400  -10.1900 -137.6300      30.3         5       123        60
OIR    2025130    131400  -10.1900 -137.6400      30.3         5       124        60
OIR    2025130    131400  -10.1900 -137.6500      30.4         5       125        60
OIR    2025130    131400  -10.1900 -137.6600      30.7         5       124        60
OIR    2025130    131400  -10.1900 -137.6700      31.1         5       122        60
OIR    2025130    131400  -10.1900 -137.6800      31.4         5       120        60
OIR    2025130    131400  -10.1900 -137.6900      31.4         5       117        60
OIR    2025130    131400  -10.1900 -137.7000      31.2         5       116        60
OIR    2025130    131400  -10.1900 -137.7100      31.0         4       116        60
OIR    2025130    131400  -10.1900 -137.7200      30.8         3       117        60
OIR    2025130    131400  -10.1900 -137.7300      30.5         1       119        60
OIR    2025130    131400  -10.1900 -137.7400      29.6       357       120        60
OIR    2025130    131400  -10.1900 -137.7500      29.3       356       119        60
OIR    2025130    131400  -10.1900 -137.7600      29.2       355       119        60
OIR    2025130    131400  -10.1900 -137.7700      29.1       355       117        60
OIR    2025130    131400  -10.1900 -137.7800      29.1       355       116        60
OIR    2025130    131400  -10.1900 -137.7900      29.0       355       116        60
OIR    2025130    131400  -10.1900 -137.8000      28.9       354       117        60
OIR    2025130    131400  -10.1900 -137.8100      28.9       354       120        60
OIR    2025130    131400  -10.1900 -137.8200      28.8       354       123        60
OIR    2025130    131400  -10.1900 -137.8300      28.7       354       128        60
OIR    2025130    131400  -10.1900 -137.8400      28.4       353       132        60
OIR    2025130    131400  -10.1900 -137.8500      28.2       353       134        60
OIR    2025130    131400  -10.1900 -137.8600      28.1       353       134        60
OIR    2025130    131400  -10.1900 -137.8700      28.1       353       135        60
OIR    2025130    131400  -10.1900 -137.8800      28.0       352       135        60
OIR    2025130    131400  -10.1900 -137.8900      27.9       352       135        60
OIR    2025130    131400  -10.1900 -137.9000      27.9       352       134        60
OIR    2025130    131400  -10.1900 -137.9100      27.8       352       134        60
OIR    2025130    131400  -10.1900 -137.9200      27.6       352       134        60
OIR    2025130    131400  -10.1900 -137.9300      27.3       351       134        60
OIR    2025130    131400  -10.1900 -137.9400      26.8       350       134        60
OIR    2025130    131400  -10.1900 -137.9500      26.4       349       137        60
OIR    2025130    131400  -10.1900 -137.9600      26.2       348       139        60
OIR    2025130    131400  -10.1900 -137.9700      26.2       347       140        60
OIR    2025130    131400  -10.1900 -137.9800      26.3       346       141        60
OIR    2025130    131400  -10.1900 -137.9900      26.8       345       139        60
OIR    2025130    131400  -10.1900 -138.0000      27.3       344       138        60
OIR    2025130    131400  -10.1900 -138.0100      27.6       343       137        60
OIR    2025130    131400  -10.1900 -138.0200      27.8       343       136        60
OIR    2025130    131400  -10.1900 -138.0300      27.9       343       134        60
OIR    2025130    131400  -10.1900 -138.0400      28.0       342       132        60
OIR    2025130    131400  -10.1900 -138.0500      28.0       342       130        60
OIR    2025130    131400  -10.1900 -138.0600      28.0       342       129        60
OIR    2025130    131400  -10.1900 -138.0700      28.1       342       129        60
OIR    2025130    131400  -10.1900 -138.0800      28.1       342       130        60
OIR    2025130    131400  -10.1900 -138.0900      28.1       342       131        60
OIR    2025130    131400  -10.1900 -138.1000      28.1       342       134        60
OIR    2025130    131400  -10.1900 -138.1100      28.1       342       136        60
OIR    2025130    131400  -10.1900 -138.1200      28.1       342       136        60
OIR    2025130    131400  -10.1900 -138.1300      28.1       342       136        60
OIR    2025130    131400  -10.1900 -138.1400      28.1       342       136        60
OIR    2025130    131400  -10.1900 -138.1500      28.1       342       135        60
OIR    2025130    131400  -10.1900 -138.1600      28.1       342       135        60
OIR    2025130    131400  -10.1900 -138.1700      28.1       342       135        60
OIR    2025130    131400  -10.1900 -138.1800      28.0       342       135        60
OIR    2025130    131400  -10.1900 -138.1900      28.0       342       134        60
OIR    2025130    131400  -10.1900 -138.2000      28.0       342       133        60
OIR    2025130    131400  -10.1900 -138.2100      28.0       341       132        60
OIR    2025130    131400  -10.1900 -138.2200      28.0       341       132        60
OIR    2025130    131400  -10.1900 -138.2300      27.8       341       135        60
OIR    2025130    131400  -10.1900 -138.2400      27.7       340       138        60
OIR    2025130    131400  -10.1900 -138.2500      27.6       339       139        60
OIR    2025130    131400  -10.1900 -138.2600      27.6       339       139        60
OIR    2025130    131400  -10.1900 -138.2700      27.6       339       139        60
OIR    2025130    131400  -10.1900 -138.2800      27.5       339       140        60
OIR    2025130    131400  -10.1900 -138.2900      27.5       339       140        60
OIR    2025130    131400  -10.1900 -138.3000      27.5       339       142        60
OIR    2025130    131400  -10.1900 -138.3100      27.5       339       145        60
OIR    2025130    131400  -10.1900 -138.3200      27.5       339       143        60
OIR    2025130    131400  -10.1900 -138.3300      27.5       339       140        60
OIR    2025130    131400  -10.1900 -138.3400      27.5       339       138        60
OIR    2025130    131400  -10.1900 -138.3500      27.5       339       135        60
OIR    2025130    131400  -10.1900 -138.3600      27.5       339       143        60
OIR    2025130    131400  -10.2000 -136.1400      38.8        53       148        60
OIR    2025130    131400  -10.2000 -136.1500      39.1        53       148        60
OIR    2025130    131400  -10.2000 -136.1600      39.3        53       148        60
OIR    2025130    131400  -10.2000 -136.1700      39.8        53       149        60
OIR    2025130    131400  -10.2000 -136.2500      41.7        51       147        60
OIR    2025130    131400  -10.2000 -136.2600      41.9        51       143        60
OIR    2025130    131400  -10.2000 -136.2700      42.1        50       141        60
OIR    2025130    131400  -10.2000 -136.2800      42.2        51       138        60
OIR    2025130    131400  -10.2000 -136.2900      42.4        51       134        60
OIR    2025130    131400  -10.2000 -136.3000      42.4        51       134        60
OIR    2025130    131400  -10.2000 -136.3100      42.5        51       133        60
OIR    2025130    131400  -10.2000 -136.3200      42.5        51       135        60
OIR    2025130    131400  -10.2000 -136.3300      42.5        51       137        60
OIR    2025130    131400  -10.2000 -136.3400      42.4        51       136        60
OIR    2025130    131400  -10.2000 -136.3500      42.3        51       136        60
OIR    2025130    131400  -10.2000 -136.3600      42.3        51       136        60
OIR    2025130    131400  -10.2000 -136.3700      42.3        51       136        60
OIR    2025130    131400  -10.2000 -136.3800      42.3        51       137        60
OIR    2025130    131400  -10.2000 -136.3900      42.3        51       138        60
OIR    2025130    131400  -10.2000 -136.4000      42.3        51       138        60
OIR    2025130    131400  -10.2000 -136.4100      42.3        50       136        60
OIR    2025130    131400  -10.2000 -136.4200      42.2        50       134        60
OIR    2025130    131400  -10.2000 -136.4300      41.8        49       135        60
OIR    2025130    131400  -10.2000 -136.4400      39.5        47       136        60
OIR    2025130    131400  -10.2000 -136.4500      38.2        46       136        60
OIR    2025130    131400  -10.2000 -136.4600      38.2        46       135        60
OIR    2025130    131400  -10.2000 -136.4700      38.2        46       132        60
OIR    2025130    131400  -10.2000 -136.4800      38.2        46       129        60
OIR    2025130    131400  -10.2000 -136.4900      38.3        46       126        60
OIR    2025130    131400  -10.2000 -136.5000      38.3        46       124        60
OIR    2025130    131400  -10.2000 -136.5100      38.3        46       122        60
OIR    2025130    131400  -10.2000 -136.5200      38.3        46       122        60
OIR    2025130    131400  -10.2000 -136.5300      38.3        46       123        60
OIR    2025130    131400  -10.2000 -136.5400      38.3        46       125        60
OIR    2025130    131400  -10.2000 -136.5500      38.4        46       127        60
OIR    2025130    131400  -10.2000 -136.5600      38.4        46       127        60
OIR    2025130    131400  -10.2000 -136.5700      38.4        46       127        60
OIR    2025130    131400  -10.2000 -136.5800      38.4        46       127        60
OIR    2025130    131400  -10.2000 -136.5900      38.4        46       127        60
OIR    2025130    131400  -10.2000 -136.6000      38.4        46       128        60
OIR    2025130    131400  -10.2000 -136.6100      38.4        46       129        60
OIR    2025130    131400  -10.2000 -136.6200      38.4        46       129        60
OIR    2025130    131400  -10.2000 -136.6300      38.4        46       129        60
OIR    2025130    131400  -10.2000 -136.6400      38.4        46       129        60
OIR    2025130    131400  -10.2000 -136.6500      38.4        46       131        60
OIR    2025130    131400  -10.2000 -136.6600      38.4        46       133        60
OIR    2025130    131400  -10.2000 -136.6700      38.4        46       133        60
OIR    2025130    131400  -10.2000 -136.6800      38.4        46       134        60
OIR    2025130    131400  -10.2000 -136.6900      38.4        46       133        60
OIR    2025130    131400  -10.2000 -136.7000      38.4        46       132        60
OIR    2025130    131400  -10.2000 -136.7100      38.3        46       131        60
OIR    2025130    131400  -10.2000 -136.7200      38.3        46       128        60
OIR    2025130    131400  -10.2000 -136.7300      38.2        46       124        60
OIR    2025130    131400  -10.2000 -136.7400      37.9        45       122        60
OIR    2025130    131400  -10.2000 -136.7500      37.7        45       121        60
OIR    2025130    131400  -10.2000 -136.7600      37.7        45       119        60
OIR    2025130    131400  -10.2000 -136.7700      37.6        44       116        60
OIR    2025130    131400  -10.2000 -136.7800      37.5        44       119        60
OIR    2025130    131400  -10.2000 -136.7900      37.3        43       120        60
OIR    2025130    131400  -10.2000 -136.8000      37.1        42       122        60
OIR    2025130    131400  -10.2000 -136.8100      37.1        41       121        60
OIR    2025130    131400  -10.2000 -136.8200      37.1        41       116        60
OIR    2025130    131400  -10.2000 -136.8300      37.0        40       116        60
OIR    2025130    131400  -10.2000 -136.8400      37.1        40       116        60
OIR    2025130    131400  -10.2000 -136.8500      37.2        40       122        60
OIR    2025130    131400  -10.2000 -136.8600      37.3        39       130        60
OIR    2025130    131400  -10.2000 -136.8700      36.9        36       125        60
OIR    2025130    131400  -10.2000 -136.8800      36.8        34       121        60
OIR    2025130    131400  -10.2000 -136.8900      37.0        31       119        60
OIR    2025130    131400  -10.2000 -136.9000      36.9        31       117        60
OIR    2025130    131400  -10.2000 -136.9100      36.7        31       121        60
OIR    2025130    131400  -10.2000 -136.9200      36.5        31       121        60
OIR    2025130    131400  -10.2000 -136.9300      36.0        31       116        60
OIR    2025130    131400  -10.2000 -136.9400      35.6        31       115        60
OIR    2025130    131400  -10.2000 -136.9500      35.6        31       115        60
OIR    2025130    131400  -10.2000 -136.9600      35.8        31       113        60
OIR    2025130    131400  -10.2000 -136.9700      36.0        31       111        60
OIR    2025130    131400  -10.2000 -136.9800      36.2        31       112        60
OIR    2025130    131400  -10.2000 -136.9900      36.3        31       112        60
OIR    2025130    131400  -10.2000 -137.0000      36.1        32       113        60
OIR    2025130    131400  -10.2000 -137.0100      36.1        32       115        60
OIR    2025130    131400  -10.2000 -137.0200      36.0        32       117        60
OIR    2025130    131400  -10.2000 -137.0300      35.9        32       119        60
OIR    2025130    131400  -10.2000 -137.0400      35.7        32       119        60
OIR    2025130    131400  -10.2000 -137.0500      35.3        32       122        60
OIR    2025130    131400  -10.2000 -137.0600      35.2        32       125        60
OIR    2025130    131400  -10.2000 -137.0700      35.2        33       122        60
OIR    2025130    131400  -10.2000 -137.0800      35.3        33       114        60
OIR    2025130    131400  -10.2000 -137.0900      35.8        33       110        60
OIR    2025130    131400  -10.2000 -137.1000      36.0        33       109        60
OIR    2025130    131400  -10.2000 -137.1100      35.8        33       110        60
OIR    2025130    131400  -10.2000 -137.1200      36.1        34       111        60
OIR    2025130    131400  -10.2000 -137.1300      36.3        34       110        60
OIR    2025130    131400  -10.2000 -137.1400      37.0        35       109        60
OIR    2025130    131400  -10.2000 -137.1500      37.4        35       109        60
OIR    2025130    131400  -10.2000 -137.1600      37.6        35       112        60
OIR    2025130    131400  -10.2000 -137.1700      37.6        35       116        60
OIR    2025130    131400  -10.2000 -137.1800      37.8        35       119        60
OIR    2025130    131400  -10.2000 -137.1900      37.9        34       121        60
OIR    2025130    131400  -10.2000 -137.2000      37.8        34       124        60
OIR    2025130    131400  -10.2000 -137.2100      37.8        34       127        60
OIR    2025130    131400  -10.2000 -137.2200      37.8        34       125        60
OIR    2025130    131400  -10.2000 -137.2300      37.8        34       122        60
OIR    2025130    131400  -10.2000 -137.2400      37.9        33       116        60
OIR    2025130    131400  -10.2000 -137.2500      38.0        33       113        60
OIR    2025130    131400  -10.2000 -137.2600      37.7        31       112        60
OIR    2025130    131400  -10.2000 -137.2700      36.8        27       111        60
OIR    2025130    131400  -10.2000 -137.2800      35.9        22       111        60
OIR    2025130    131400  -10.2000 -137.2900      35.6        19       112        60
OIR    2025130    131400  -10.2000 -137.3000      35.6        18       114        60
OIR    2025130    131400  -10.2000 -137.3100      35.5        17       113        60
OIR    2025130    131400  -10.2000 -137.3200      35.2        16       111        60
OIR    2025130    131400  -10.2000 -137.3300      34.8        16       112        60
OIR    2025130    131400  -10.2000 -137.3400      34.6        15       112        60
OIR    2025130    131400  -10.2000 -137.3500      34.4        14       113        60
OIR    2025130    131400  -10.2000 -137.3600      34.2        13       113        60
OIR    2025130    131400  -10.2000 -137.3700      34.1        13       113        60
OIR    2025130    131400  -10.2000 -137.3800      34.0        13       112        60
OIR    2025130    131400  -10.2000 -137.3900      33.9        13       108        60
OIR    2025130    131400  -10.2000 -137.4000      33.8        13       108        60
OIR    2025130    131400  -10.2000 -137.4100      33.7        13       110        60
OIR    2025130    131400  -10.2000 -137.4200      33.3        13       109        60
OIR    2025130    131400  -10.2000 -137.4300      32.8        12       109        60
OIR    2025130    131400  -10.2000 -137.4400      32.3        12       109        60
OIR    2025130    131400  -10.2000 -137.4500      31.3        11       109        60
OIR    2025130    131400  -10.2000 -137.4600      30.8         9       112        60
OIR    2025130    131400  -10.2000 -137.4700      30.6         9       113        60
OIR    2025130    131400  -10.2000 -137.4800      30.5         8       113        60
OIR    2025130    131400  -10.2000 -137.4900      30.5         7       112        60
OIR    2025130    131400  -10.2000 -137.5000      30.4         7       109        60
OIR    2025130    131400  -10.2000 -137.5100      30.3         7       109        60
OIR    2025130    131400  -10.2000 -137.5200      30.2         6       109        60
OIR    2025130    131400  -10.2000 -137.5300      30.2         6       108        60
OIR    2025130    131400  -10.2000 -137.5400      30.2         6       105        60
OIR    2025130    131400  -10.2000 -137.5500      30.2         6       108        60
OIR    2025130    131400  -10.2000 -137.5600      30.2         5       110        60
OIR    2025130    131400  -10.2000 -137.5700      30.2         5       113        60
OIR    2025130    131400  -10.2000 -137.5800      30.3         5       116        60
OIR    2025130    131400  -10.2000 -137.5900      30.3         5       120        60
OIR    2025130    131400  -10.2000 -137.6000      30.3         5       121        60
OIR    2025130    131400  -10.2000 -137.6100      30.3         5       119        60
OIR    2025130    131400  -10.2000 -137.6200      30.3         5       120        60
OIR    2025130    131400  -10.2000 -137.6300      30.3         5       124        60
OIR    2025130    131400  -10.2000 -137.6400      30.3         5       125        60
OIR    2025130    131400  -10.2000 -137.6500      30.3         5       127        60
OIR    2025130    131400  -10.2000 -137.6600      30.3         5       126        60
OIR    2025130    131400  -10.2000 -137.6700      30.3         5       124        60
OIR    2025130    131400  -10.2000 -137.6800      30.4         5       121        60
OIR    2025130    131400  -10.2000 -137.6900      30.5         5       117        60
OIR    2025130    131400  -10.2000 -137.7000      30.6         4       116        60
OIR    2025130    131400  -10.2000 -137.7100      30.5         4       116        60
OIR    2025130    131400  -10.2000 -137.7200      30.4         3       116        60
OIR    2025130    131400  -10.2000 -137.7300      30.1         1       117        60
OIR    2025130    131400  -10.2000 -137.7400      29.3       358       117        60
OIR    2025130    131400  -10.2000 -137.7500      29.1       356       119        60
OIR    2025130    131400  -10.2000 -137.7600      29.0       355       120        60
OIR    2025130    131400  -10.2000 -137.7700      28.9       355       120        60
OIR    2025130    131400  -10.2000 -137.7800      28.9       355       120        60
OIR    2025130    131400  -10.2000 -137.7900      28.9       355       120        60
OIR    2025130    131400  -10.2000 -137.8000      28.8       355       121        60
OIR    2025130    131400  -10.2000 -137.8100      28.8       354       122        60
OIR    2025130    131400  -10.2000 -137.8200      28.7       354       124        60
OIR    2025130    131400  -10.2000 -137.8300      28.6       354       127        60
OIR    2025130    131400  -10.2000 -137.8400      28.4       353       129        60
OIR    2025130    131400  -10.2000 -137.8500      28.3       353       130        60
OIR    2025130    131400  -10.2000 -137.8600      28.2       353       131        60
OIR    2025130    131400  -10.2000 -137.8700      28.1       353       131        60
OIR    2025130    131400  -10.2000 -137.8800      28.0       352       131        60
OIR    2025130    131400  -10.2000 -137.8900      27.9       352       132        60
OIR    2025130    131400  -10.2000 -137.9000      27.8       352       131        60
OIR    2025130    131400  -10.2000 -137.9100      27.7       352       131        60
OIR    2025130    131400  -10.2000 -137.9200      27.5       352       131        60
OIR    2025130    131400  -10.2000 -137.9300      27.1       351       132        60
OIR    2025130    131400  -10.2000 -137.9400      26.6       350       132        60
OIR    2025130    131400  -10.2000 -137.9500      26.2       349       134        60
OIR    2025130    131400  -10.2000 -137.9600      26.1       348       137        60
OIR    2025130    131400  -10.2000 -137.9700      26.0       348       138        60
OIR    2025130    131400  -10.2000 -137.9800      26.1       346       139        60
OIR    2025130    131400  -10.2000 -137.9900      26.4       345       139        60
OIR    2025130    131400  -10.2000 -138.0000      26.9       344       138        60
OIR    2025130    131400  -10.2000 -138.0100      27.3       343       137        60
OIR    2025130    131400  -10.2000 -138.0200      27.7       343       136        60
OIR    2025130    131400  -10.2000 -138.0300      27.9       343       134        60
OIR    2025130    131400  -10.2000 -138.0400      27.9       342       132        60
OIR    2025130    131400  -10.2000 -138.0500      28.0       342       131        60
OIR    2025130    131400  -10.2000 -138.0600      28.0       342       130        60
OIR    2025130    131400  -10.2000 -138.0700      28.0       342       131        60
OIR    2025130    131400  -10.2000 -138.0800      28.0       342       131        60
OIR    2025130    131400  -10.2000 -138.0900      28.0       342       132        60
OIR    2025130    131400  -10.2000 -138.1000      28.0       342       134        60
OIR    2025130    131400  -10.2000 -138.1100      28.0       342       136        60
OIR    2025130    131400  -10.2000 -138.1200      28.0       342       135        60
OIR    2025130    131400  -10.2000 -138.1300      28.0       342       136        60
OIR    2025130    131400  -10.2000 -138.1400      28.1       342       137        60
OIR    2025130    131400  -10.2000 -138.1500      28.1       342       137        60
OIR    2025130    131400  -10.2000 -138.1600      28.1       342       136        60
OIR    2025130    131400  -10.2000 -138.1700      28.1       342       135        60
OIR    2025130    131400  -10.2000 -138.1800      28.1       342       134        60
OIR    2025130    131400  -10.2000 -138.1900      28.1       342       133        60
OIR    2025130    131400  -10.2000 -138.2000      28.0       342       131        60
OIR    2025130    131400  -10.2000 -138.2100      28.0       342       130        60
OIR    2025130    131400  -10.2000 -138.2200      28.0       341       130        60
OIR    2025130    131400  -10.2000 -138.2300      27.9       341       133        60
OIR    2025130    131400  -10.2000 -138.2400      27.9       340       136        60
OIR    2025130    131400  -10.2000 -138.2500      27.7       340       137        60
OIR    2025130    131400  -10.2000 -138.2600      27.6       339       138        60
OIR    2025130    131400  -10.2000 -138.2700      27.5       339       140        60
OIR    2025130    131400  -10.2000 -138.2800      27.5       339       142        60
OIR    2025130    131400  -10.2000 -138.2900      27.5       339       145        60
OIR    2025130    131400  -10.2000 -138.3300      27.5       339       145        60
OIR    2025130    131400  -10.2000 -138.3400      27.5       339       143        60
OIR    2025130    131400  -10.2000 -138.3500      27.5       339       141        60
OIR    2025130    131400  -10.2000 -138.3600      27.5       339       147        60
OIR    2025130    131400  -10.2100 -136.1500      38.8        53       149        60
OIR    2025130    131400  -10.2100 -136.1600      39.0        53       147        60
OIR    2025130    131400  -10.2100 -136.1700      39.4        53       147        60
OIR    2025130    131400  -10.2100 -136.1800      39.7        53       147        60
OIR    2025130    131400  -10.2100 -136.1900      40.0        53       149        60
OIR    2025130    131400  -10.2100 -136.2000      40.2        52       149        60
OIR    2025130    131400  -10.2100 -136.2100      40.4        52       147        60
OIR    2025130    131400  -10.2100 -136.2200      40.8        52       147        60
OIR    2025130    131400  -10.2100 -136.2600      42.0        50       145        60
OIR    2025130    131400  -10.2100 -136.2700      42.2        50       143        60
OIR    2025130    131400  -10.2100 -136.2800      42.3        50       139        60
OIR    2025130    131400  -10.2100 -136.2900      42.5        50       134        60
OIR    2025130    131400  -10.2100 -136.3000      42.7        51       134        60
OIR    2025130    131400  -10.2100 -136.3100      42.7        51       133        60
OIR    2025130    131400  -10.2100 -136.3200      42.8        51       135        60
OIR    2025130    131400  -10.2100 -136.3300      42.7        51       137        60
OIR    2025130    131400  -10.2100 -136.3400      42.5        51       139        60
OIR    2025130    131400  -10.2100 -136.3500      42.4        51       140        60
OIR    2025130    131400  -10.2100 -136.3600      42.3        51       139        60
OIR    2025130    131400  -10.2100 -136.3700      42.3        51       139        60
OIR    2025130    131400  -10.2100 -136.3800      42.3        51       140        60
OIR    2025130    131400  -10.2100 -136.3900      42.2        51       142        60
OIR    2025130    131400  -10.2100 -136.4000      42.0        51       145        60
OIR    2025130    131400  -10.2100 -136.4100      41.8        50       141        60
OIR    2025130    131400  -10.2100 -136.4200      41.5        50       137        60
OIR    2025130    131400  -10.2100 -136.4300      40.7        49       134        60
OIR    2025130    131400  -10.2100 -136.4400      39.0        47       133        60
OIR    2025130    131400  -10.2100 -136.4500      38.2        46       134        60
OIR    2025130    131400  -10.2100 -136.4600      38.2        46       133        60
OIR    2025130    131400  -10.2100 -136.4700      38.2        46       132        60
OIR    2025130    131400  -10.2100 -136.4800      38.2        46       130        60
OIR    2025130    131400  -10.2100 -136.4900      38.3        46       127        60
OIR    2025130    131400  -10.2100 -136.5000      38.3        46       124        60
OIR    2025130    131400  -10.2100 -136.5100      38.3        46       121        60
OIR    2025130    131400  -10.2100 -136.5200      38.3        46       123        60
OIR    2025130    131400  -10.2100 -136.5300      38.3        46       124        60
OIR    2025130    131400  -10.2100 -136.5400      38.3        46       127        60
OIR    2025130    131400  -10.2100 -136.5500      38.4        46       129        60
OIR    2025130    131400  -10.2100 -136.5600      38.4        46       127        60
OIR    2025130    131400  -10.2100 -136.5700      38.4        46       126        60
OIR    2025130    131400  -10.2100 -136.5800      38.4        46       126        60
OIR    2025130    131400  -10.2100 -136.5900      38.4        46       127        60
OIR    2025130    131400  -10.2100 -136.6000      38.4        46       128        60
OIR    2025130    131400  -10.2100 -136.6100      38.4        46       129        60
OIR    2025130    131400  -10.2100 -136.6200      38.4        46       130        60
OIR    2025130    131400  -10.2100 -136.6300      38.4        46       129        60
OIR    2025130    131400  -10.2100 -136.6400      38.4        46       129        60
OIR    2025130    131400  -10.2100 -136.6500      38.4        46       130        60
OIR    2025130    131400  -10.2100 -136.6600      38.4        46       131        60
OIR    2025130    131400  -10.2100 -136.6700      38.4        46       132        60
OIR    2025130    131400  -10.2100 -136.6800      38.4        46       133        60
OIR    2025130    131400  -10.2100 -136.6900      38.4        46       133        60
OIR    2025130    131400  -10.2100 -136.7000      38.4        46       132        60
OIR    2025130    131400  -10.2100 -136.7100      38.3        46       130        60
OIR    2025130    131400  -10.2100 -136.7200      38.2        46       129        60
OIR    2025130    131400  -10.2100 -136.7300      38.1        46       127        60
OIR    2025130    131400  -10.2100 -136.7400      37.9        45       125        60
OIR    2025130    131400  -10.2100 -136.7500      37.8        45       123        60
OIR    2025130    131400  -10.2100 -136.7600      37.7        44       120        60
OIR    2025130    131400  -10.2100 -136.7700      37.6        44       119        60
OIR    2025130    131400  -10.2100 -136.7800      37.5        44       121        60
OIR    2025130    131400  -10.2100 -136.7900      37.2        42       124        60
OIR    2025130    131400  -10.2100 -136.8000      37.0        41       124        60
OIR    2025130    131400  -10.2100 -136.8100      37.0        41       121        60
OIR    2025130    131400  -10.2100 -136.8200      37.0        40       115        60
OIR    2025130    131400  -10.2100 -136.8300      37.0        40       114        60
OIR    2025130    131400  -10.2100 -136.8400      37.1        40       116        60
OIR    2025130    131400  -10.2100 -136.8500      37.2        40       121        60
OIR    2025130    131400  -10.2100 -136.8600      37.3        39       129        60
OIR    2025130    131400  -10.2100 -136.8700      36.9        35       128        60
OIR    2025130    131400  -10.2100 -136.8800      37.0        33       126        60
OIR    2025130    131400  -10.2100 -136.8900      37.1        31       126        60
OIR    2025130    131400  -10.2100 -136.9000      37.0        31       125        60
OIR    2025130    131400  -10.2100 -136.9100      36.6        30       128        60
OIR    2025130    131400  -10.2100 -136.9200      36.2        30       128        60
OIR    2025130    131400  -10.2100 -136.9300      35.2        30       123        60
OIR    2025130    131400  -10.2100 -136.9400      33.7        30       120        60
OIR    2025130    131400  -10.2100 -136.9500      33.1        31       116        60
OIR    2025130    131400  -10.2100 -136.9600      32.6        31       113        60
OIR    2025130    131400  -10.2100 -136.9700      32.4        31       111        60
OIR    2025130    131400  -10.2100 -136.9800      32.6        31       111        60
OIR    2025130    131400  -10.2100 -136.9900      33.3        31       111        60
OIR    2025130    131400  -10.2100 -137.0000      34.2        31       111        60
OIR    2025130    131400  -10.2100 -137.0100      35.1        31       111        60
OIR    2025130    131400  -10.2100 -137.0200      35.6        31       116        60
OIR    2025130    131400  -10.2100 -137.0300      35.6        31       120        60
OIR    2025130    131400  -10.2100 -137.0400      35.3        31       121        60
OIR    2025130    131400  -10.2100 -137.0500      34.7        32       125        60
OIR    2025130    131400  -10.2100 -137.0600      34.5        32       129        60
OIR    2025130    131400  -10.2100 -137.0700      34.4        32       127        60
OIR    2025130    131400  -10.2100 -137.0800      34.6        32       119        60
OIR    2025130    131400  -10.2100 -137.0900      35.3        32       113        60
OIR    2025130    131400  -10.2100 -137.1000      35.5        32       109        60
OIR    2025130    131400  -10.2100 -137.1100      35.1        32       109        60
OIR    2025130    131400  -10.2100 -137.1200      35.4        33       109        60
OIR    2025130    131400  -10.2100 -137.1300      35.9        34       107        60
OIR    2025130    131400  -10.2100 -137.1400      36.5        35       105        60
OIR    2025130    131400  -10.2100 -137.1500      36.9        35       105        60
OIR    2025130    131400  -10.2100 -137.1600      37.2        35       110        60
OIR    2025130    131400  -10.2100 -137.1700      37.2        34       116        60
OIR    2025130    131400  -10.2100 -137.1800      37.2        34       119        60
OIR    2025130    131400  -10.2100 -137.1900      37.5        34       120        60
OIR    2025130    131400  -10.2100 -137.2000      37.6        34       123        60
OIR    2025130    131400  -10.2100 -137.2100      37.6        34       124        60
OIR    2025130    131400  -10.2100 -137.2200      37.6        34       123        60
OIR    2025130    131400  -10.2100 -137.2300      37.6        33       122        60
OIR    2025130    131400  -10.2100 -137.2400      37.7        33       116        60
OIR    2025130    131400  -10.2100 -137.2500      37.7        31       114        60
OIR    2025130    131400  -10.2100 -137.2600      36.9        28       111        60
OIR    2025130    131400  -10.2100 -137.2700      35.8        24       110        60
OIR    2025130    131400  -10.2100 -137.2800      35.3        20       110        60
OIR    2025130    131400  -10.2100 -137.2900      35.2        19       113        60
OIR    2025130    131400  -10.2100 -137.3000      35.2        18       116        60
OIR    2025130    131400  -10.2100 -137.3100      35.1        18       115        60
OIR    2025130    131400  -10.2100 -137.3200      34.8        17       114        60
OIR    2025130    131400  -10.2100 -137.3300      34.6        16       113        60
OIR    2025130    131400  -10.2100 -137.3400      34.5        15       113        60
OIR    2025130    131400  -10.2100 -137.3500      34.3        14       109        60
OIR    2025130    131400  -10.2100 -137.3600      34.1        13       108        60
OIR    2025130    131400  -10.2100 -137.3700      34.0        13       109        60
OIR    2025130    131400  -10.2100 -137.3800      33.9        13       109        60
OIR    2025130    131400  -10.2100 -137.3900      33.9        13       107        60
OIR    2025130    131400  -10.2100 -137.4000      33.8        13       108        60
OIR    2025130    131400  -10.2100 -137.4100      33.6        13       111        60
OIR    2025130    131400  -10.2100 -137.4200      33.2        12       110        60
OIR    2025130    131400  -10.2100 -137.4300      32.7        12       108        60
OIR    2025130    131400  -10.2100 -137.4400      32.2        12       107        60
OIR    2025130    131400  -10.2100 -137.4500      31.2        10       107        60
OIR    2025130    131400  -10.2100 -137.4600      30.8         9       108        60
OIR    2025130    131400  -10.2100 -137.4700      30.6         8       110        60
OIR    2025130    131400  -10.2100 -137.4800      30.5         8       111        60
OIR    2025130    131400  -10.2100 -137.4900      30.4         7       110        60
OIR    2025130    131400  -10.2100 -137.5000      30.4         7       107        60
OIR    2025130    131400  -10.2100 -137.5100      30.3         6       105        60
OIR    2025130    131400  -10.2100 -137.5200      30.2         6       104        60
OIR    2025130    131400  -10.2100 -137.5300      30.2         6       104        60
OIR    2025130    131400  -10.2100 -137.5400      30.2         6       103        60
OIR    2025130    131400  -10.2100 -137.5500      30.2         6       104        60
OIR    2025130    131400  -10.2100 -137.5600      30.2         6       108        60
OIR    2025130    131400  -10.2100 -137.5700      30.2         5       112        60
OIR    2025130    131400  -10.2100 -137.5800      30.3         5       115        60
OIR    2025130    131400  -10.2100 -137.5900      30.3         5       117        60
OIR    2025130    131400  -10.2100 -137.6000      30.3         5       119        60
OIR    2025130    131400  -10.2100 -137.6100      30.3         5       117        60
OIR    2025130    131400  -10.2100 -137.6200      30.3         5       120        60
OIR    2025130    131400  -10.2100 -137.6300      30.3         5       123        60
OIR    2025130    131400  -10.2100 -137.6400      30.3         5       125        60
OIR    2025130    131400  -10.2100 -137.6500      30.3         5       127        60
OIR    2025130    131400  -10.2100 -137.6600      30.3         5       126        60
OIR    2025130    131400  -10.2100 -137.6700      30.3         5       125        60
OIR    2025130    131400  -10.2100 -137.6800      30.3         5       121        60
OIR    2025130    131400  -10.2100 -137.6900      30.3         5       117        60
OIR    2025130    131400  -10.2100 -137.7000      30.3         4       116        60
OIR    2025130    131400  -10.2100 -137.7100      30.3         4       116        60
OIR    2025130    131400  -10.2100 -137.7200      30.2         3       116        60
OIR    2025130    131400  -10.2100 -137.7300      29.9         1       116        60
OIR    2025130    131400  -10.2100 -137.7400      29.3       358       116        60
OIR    2025130    131400  -10.2100 -137.7500      28.9       357       119        60
OIR    2025130    131400  -10.2100 -137.7600      28.8       356       120        60
OIR    2025130    131400  -10.2100 -137.7700      28.7       355       121        60
OIR    2025130    131400  -10.2100 -137.7800      28.7       355       121        60
OIR    2025130    131400  -10.2100 -137.7900      28.7       355       123        60
OIR    2025130    131400  -10.2100 -137.8000      28.7       355       123        60
OIR    2025130    131400  -10.2100 -137.8100      28.6       354       124        60
OIR    2025130    131400  -10.2100 -137.8200      28.5       354       124        60
OIR    2025130    131400  -10.2100 -137.8300      28.4       354       124        60
OIR    2025130    131400  -10.2100 -137.8400      28.3       353       125        60
OIR    2025130    131400  -10.2100 -137.8500      28.2       353       127        60
OIR    2025130    131400  -10.2100 -137.8600      28.1       353       127        60
OIR    2025130    131400  -10.2100 -137.8700      28.0       353       128        60
OIR    2025130    131400  -10.2100 -137.8800      27.9       353       128        60
OIR    2025130    131400  -10.2100 -137.8900      27.9       352       129        60
OIR    2025130    131400  -10.2100 -137.9000      27.8       352       129        60
OIR    2025130    131400  -10.2100 -137.9100      27.6       352       129        60
OIR    2025130    131400  -10.2100 -137.9200      27.3       351       129        60
OIR    2025130    131400  -10.2100 -137.9300      26.8       351       130        60
OIR    2025130    131400  -10.2100 -137.9400      26.3       349       130        60
OIR    2025130    131400  -10.2100 -137.9500      26.0       349       132        60
OIR    2025130    131400  -10.2100 -137.9600      25.9       348       135        60
OIR    2025130    131400  -10.2100 -137.9700      25.9       348       137        60
OIR    2025130    131400  -10.2100 -137.9800      25.9       347       138        60
OIR    2025130    131400  -10.2100 -137.9900      26.2       346       138        60
OIR    2025130    131400  -10.2100 -138.0000      26.6       345       138        60
OIR    2025130    131400  -10.2100 -138.0100      27.0       344       137        60
OIR    2025130    131400  -10.2100 -138.0200      27.6       343       136        60
OIR    2025130    131400  -10.2100 -138.0300      27.8       343       135        60
OIR    2025130    131400  -10.2100 -138.0400      27.8       343       133        60
OIR    2025130    131400  -10.2100 -138.0500      27.9       342       132        60
OIR    2025130    131400  -10.2100 -138.0600      27.9       342       132        60
OIR    2025130    131400  -10.2100 -138.0700      27.9       342       133        60
OIR    2025130    131400  -10.2100 -138.0800      28.0       342       133        60
OIR    2025130    131400  -10.2100 -138.0900      28.0       342       133        60
OIR    2025130    131400  -10.2100 -138.1000      28.0       342       134        60
OIR    2025130    131400  -10.2100 -138.1100      28.0       342       136        60
OIR    2025130    131400  -10.2100 -138.1200      28.0       342       136        60
OIR    2025130    131400  -10.2100 -138.1300      28.0       342       136        60
OIR    2025130    131400  -10.2100 -138.1400      28.0       342       138        60
OIR    2025130    131400  -10.2100 -138.1500      28.1       342       138        60
OIR    2025130    131400  -10.2100 -138.1600      28.1       342       136        60
OIR    2025130    131400  -10.2100 -138.1700      28.1       342       135        60
OIR    2025130    131400  -10.2100 -138.1800      28.1       342       133        60
OIR    2025130    131400  -10.2100 -138.1900      28.1       342       132        60
OIR    2025130    131400  -10.2100 -138.2000      28.1       342       130        60
OIR    2025130    131400  -10.2100 -138.2100      28.1       342       129        60
OIR    2025130    131400  -10.2100 -138.2200      28.0       341       129        60
OIR    2025130    131400  -10.2100 -138.2300      28.0       341       131        60
OIR    2025130    131400  -10.2100 -138.2400      27.9       341       133        60
OIR    2025130    131400  -10.2100 -138.2500      27.8       340       135        60
OIR    2025130    131400  -10.2100 -138.2600      27.7       339       136        60
OIR    2025130    131400  -10.2100 -138.2700      27.6       339       139        60
OIR    2025130    131400  -10.2100 -138.2800      27.5       339       144        60
OIR    2025130    131400  -10.2100 -138.2900      27.5       339       148        60
OIR    2025130    131400  -10.2100 -138.3300      27.5       339       148        60
OIR    2025130    131400  -10.2100 -138.3400      27.5       339       146        60
OIR    2025130    131400  -10.2100 -138.3500      27.5       339       145        60
OIR    2025130    131400  -10.2100 -138.3600      27.5       339       148        60
OIR    2025130    131400  -10.2200 -136.1600      38.7        53       148        60
OIR    2025130    131400  -10.2200 -136.1700      39.1        53       148        60
OIR    2025130    131400  -10.2200 -136.1900      39.8        53       149        60
OIR    2025130    131400  -10.2200 -136.2000      40.0        52       148        60
OIR    2025130    131400  -10.2200 -136.2100      40.3        52       146        60
OIR    2025130    131400  -10.2200 -136.2200      40.8        51       145        60
OIR    2025130    131400  -10.2200 -136.2300      41.4        50       148        60
OIR    2025130    131400  -10.2200 -136.2400      41.9        50       148        60
OIR    2025130    131400  -10.2200 -136.2500      42.1        50       145        60
OIR    2025130    131400  -10.2200 -136.2600      42.2        50       144        60
OIR    2025130    131400  -10.2200 -136.2700      42.3        50       142        60
OIR    2025130    131400  -10.2200 -136.2800      42.5        50       139        60
OIR    2025130    131400  -10.2200 -136.2900      42.7        50       135        60
OIR    2025130    131400  -10.2200 -136.3000      42.9        50       134        60
OIR    2025130    131400  -10.2200 -136.3100      43.0        50       134        60
OIR    2025130    131400  -10.2200 -136.3200      43.1        50       136        60
OIR    2025130    131400  -10.2200 -136.3300      43.1        50       139        60
OIR    2025130    131400  -10.2200 -136.3400      42.9        50       144        60
OIR    2025130    131400  -10.2200 -136.3500      42.5        51       146        60
OIR    2025130    131400  -10.2200 -136.3600      42.3        51       146        60
OIR    2025130    131400  -10.2200 -136.3700      42.3        51       146        60
OIR    2025130    131400  -10.2200 -136.3800      42.2        51       143        60
OIR    2025130    131400  -10.2200 -136.3900      42.0        51       143        60
OIR    2025130    131400  -10.2200 -136.4000      41.7        51       145        60
OIR    2025130    131400  -10.2200 -136.4100      41.2        50       141        60
OIR    2025130    131400  -10.2200 -136.4200      40.4        49       136        60
OIR    2025130    131400  -10.2200 -136.4300      39.4        47       134        60
OIR    2025130    131400  -10.2200 -136.4400      38.5        46       132        60
OIR    2025130    131400  -10.2200 -136.4500      38.2        46       132        60
OIR    2025130    131400  -10.2200 -136.4600      38.2        46       131        60
OIR    2025130    131400  -10.2200 -136.4700      38.2        46       131        60
OIR    2025130    131400  -10.2200 -136.4800      38.3        46       130        60
OIR    2025130    131400  -10.2200 -136.4900      38.3        46       128        60
OIR    2025130    131400  -10.2200 -136.5000      38.3        46       126        60
OIR    2025130    131400  -10.2200 -136.5100      38.3        46       124        60
OIR    2025130    131400  -10.2200 -136.5200      38.3        46       126        60
OIR    2025130    131400  -10.2200 -136.5300      38.3        46       128        60
OIR    2025130    131400  -10.2200 -136.5400      38.4        46       128        60
OIR    2025130    131400  -10.2200 -136.5500      38.4        46       128        60
OIR    2025130    131400  -10.2200 -136.5600      38.4        46       127        60
OIR    2025130    131400  -10.2200 -136.5700      38.4        46       126        60
OIR    2025130    131400  -10.2200 -136.5800      38.4        46       125        60
OIR    2025130    131400  -10.2200 -136.5900      38.4        46       125        60
OIR    2025130    131400  -10.2200 -136.6000      38.4        46       126        60
OIR    2025130    131400  -10.2200 -136.6100      38.4        46       128        60
OIR    2025130    131400  -10.2200 -136.6200      38.4        46       129        60
OIR    2025130    131400  -10.2200 -136.6300      38.4        46       130        60
OIR    2025130    131400  -10.2200 -136.6400      38.4        46       130        60
OIR    2025130    131400  -10.2200 -136.6500      38.4        46       131        60
OIR    2025130    131400  -10.2200 -136.6600      38.4        46       131        60
OIR    2025130    131400  -10.2200 -136.6700      38.4        46       131        60
OIR    2025130    131400  -10.2200 -136.6800      38.4        46       131        60
OIR    2025130    131400  -10.2200 -136.6900      38.4        46       130        60
OIR    2025130    131400  -10.2200 -136.7000      38.3        46       129        60
OIR    2025130    131400  -10.2200 -136.7100      38.2        46       129        60
OIR    2025130    131400  -10.2200 -136.7200      38.1        46       127        60
OIR    2025130    131400  -10.2200 -136.7300      38.1        45       126        60
OIR    2025130    131400  -10.2200 -136.7400      38.0        45       124        60
OIR    2025130    131400  -10.2200 -136.7500      37.9        44       122        60
OIR    2025130    131400  -10.2200 -136.7600      37.8        44       120        60
OIR    2025130    131400  -10.2200 -136.7700      37.7        44       119        60
OIR    2025130    131400  -10.2200 -136.7800      37.6        43       121        60
OIR    2025130    131400  -10.2200 -136.7900      37.2        42       124        60
OIR    2025130    131400  -10.2200 -136.8000      37.1        41       123        60
OIR    2025130    131400  -10.2200 -136.8100      37.0        40       121        60
OIR    2025130    131400  -10.2200 -136.8200      37.0        40       116        60
OIR    2025130    131400  -10.2200 -136.8300      37.0        40       116        60
OIR    2025130    131400  -10.2200 -136.8400      37.0        40       117        60
OIR    2025130    131400  -10.2200 -136.8500      37.2        39       123        60
OIR    2025130    131400  -10.2200 -136.8600      37.2        38       130        60
OIR    2025130    131400  -10.2200 -136.8700      36.8        34       128        60
OIR    2025130    131400  -10.2200 -136.8800      37.0        33       128        60
OIR    2025130    131400  -10.2200 -136.8900      37.1        31       130        60
OIR    2025130    131400  -10.2200 -136.9000      37.1        31       132        60
OIR    2025130    131400  -10.2200 -136.9100      36.1        30       134        60
OIR    2025130    131400  -10.2200 -136.9200      34.7        29       132        60
OIR    2025130    131400  -10.2200 -136.9300      33.6        30       125        60
OIR    2025130    131400  -10.2200 -136.9400      32.6        30       121        60
OIR    2025130    131400  -10.2200 -136.9500      32.2        31       117        60
OIR    2025130    131400  -10.2200 -136.9600      32.0        31       116        60
OIR    2025130    131400  -10.2200 -136.9700      32.0        31       115        60
OIR    2025130    131400  -10.2200 -136.9800      32.0        31       115        60
OIR    2025130    131400  -10.2200 -136.9900      32.2        31       114        60
OIR    2025130    131400  -10.2200 -137.0000      32.7        30       112        60
OIR    2025130    131400  -10.2200 -137.0100      33.5        30       111        60
OIR    2025130    131400  -10.2200 -137.0200      34.2        30       113        60
OIR    2025130    131400  -10.2200 -137.0300      34.4        30       115        60
OIR    2025130    131400  -10.2200 -137.0400      34.2        30       117        60
OIR    2025130    131400  -10.2200 -137.0500      33.9        30       121        60
OIR    2025130    131400  -10.2200 -137.0600      33.7        31       124        60
OIR    2025130    131400  -10.2200 -137.0700      33.5        30       123        60
OIR    2025130    131400  -10.2200 -137.0800      34.1        30       121        60
OIR    2025130    131400  -10.2200 -137.0900      34.4        30       115        60
OIR    2025130    131400  -10.2200 -137.1000      34.5        31       110        60
OIR    2025130    131400  -10.2200 -137.1100      34.2        32       109        60
OIR    2025130    131400  -10.2200 -137.1200      34.3        33       108        60
OIR    2025130    131400  -10.2200 -137.1300      34.8        34       107        60
OIR    2025130    131400  -10.2200 -137.1400      35.6        36       107        60
OIR    2025130    131400  -10.2200 -137.1500      36.2        36       108        60
OIR    2025130    131400  -10.2200 -137.1600      36.7        35       113        60
OIR    2025130    131400  -10.2200 -137.1700      36.8        33       119        60
OIR    2025130    131400  -10.2200 -137.1800      36.7        33       121        60
OIR    2025130    131400  -10.2200 -137.1900      36.8        33       121        60
OIR    2025130    131400  -10.2200 -137.2000      37.0        33       120        60
OIR    2025130    131400  -10.2200 -137.2100      37.3        33       119        60
OIR    2025130    131400  -10.2200 -137.2200      37.4        33       117        60
OIR    2025130    131400  -10.2200 -137.2300      37.5        33       117        60
OIR    2025130    131400  -10.2200 -137.2400      37.5        32       115        60
OIR    2025130    131400  -10.2200 -137.2500      37.4        28       112        60
OIR    2025130    131400  -10.2200 -137.2600      36.6        24       109        60
OIR    2025130    131400  -10.2200 -137.2700      35.8        21       108        60
OIR    2025130    131400  -10.2200 -137.2800      35.4        19       108        60
OIR    2025130    131400  -10.2200 -137.2900      35.3        18       110        60
OIR    2025130    131400  -10.2200 -137.3000      35.2        18       111        60
OIR    2025130    131400  -10.2200 -137.3100      35.1        18       109        60
OIR    2025130    131400  -10.2200 -137.3200      34.9        17       107        60
OIR    2025130    131400  -10.2200 -137.3300      34.5        16       107        60
OIR    2025130    131400  -10.2200 -137.3400      34.3        15       107        60
OIR    2025130    131400  -10.2200 -137.3500      34.1        14       105        60
OIR    2025130    131400  -10.2200 -137.3600      34.0        13       104        60
OIR    2025130    131400  -10.2200 -137.3700      33.9        13       105        60
OIR    2025130    131400  -10.2200 -137.3800      33.9        13       105        60
OIR    2025130    131400  -10.2200 -137.3900      33.8        13       104        60
OIR    2025130    131400  -10.2200 -137.4000      33.8        13       105        60
OIR    2025130    131400  -10.2200 -137.4100      33.6        13       108        60
OIR    2025130    131400  -10.2200 -137.4200      33.2        12       107        60
OIR    2025130    131400  -10.2200 -137.4300      32.6        12       105        60
OIR    2025130    131400  -10.2200 -137.4400      32.0        11       104        60
OIR    2025130    131400  -10.2200 -137.4500      31.1        10       104        60
OIR    2025130    131400  -10.2200 -137.4600      30.7         9       107        60
OIR    2025130    131400  -10.2200 -137.4700      30.6         8       109        60
OIR    2025130    131400  -10.2200 -137.4800      30.5         8       111        60
OIR    2025130    131400  -10.2200 -137.4900      30.4         7       112        60
OIR    2025130    131400  -10.2200 -137.5000      30.3         6       107        60
OIR    2025130    131400  -10.2200 -137.5100      30.3         6       104        60
OIR    2025130    131400  -10.2200 -137.5200      30.2         6       104        60
OIR    2025130    131400  -10.2200 -137.5300      30.2         6       104        60
OIR    2025130    131400  -10.2200 -137.5400      30.2         6       103        60
OIR    2025130    131400  -10.2200 -137.5500      30.2         6       104        60
OIR    2025130    131400  -10.2200 -137.5600      30.2         6       104        60
OIR    2025130    131400  -10.2200 -137.5700      30.2         5       108        60
OIR    2025130    131400  -10.2200 -137.5800      30.3         5       112        60
OIR    2025130    131400  -10.2200 -137.5900      30.3         5       116        60
OIR    2025130    131400  -10.2200 -137.6000      30.3         5       119        60
OIR    2025130    131400  -10.2200 -137.6100      30.3         5       119        60
OIR    2025130    131400  -10.2200 -137.6200      30.3         5       120        60
OIR    2025130    131400  -10.2200 -137.6300      30.3         5       120        60
OIR    2025130    131400  -10.2200 -137.6400      30.3         5       121        60
OIR    2025130    131400  -10.2200 -137.6500      30.3         5       121        60
OIR    2025130    131400  -10.2200 -137.6600      30.3         5       122        60
OIR    2025130    131400  -10.2200 -137.6700      30.3         5       123        60
OIR    2025130    131400  -10.2200 -137.6800      30.3         5       119        60
OIR    2025130    131400  -10.2200 -137.6900      30.3         5       116        60
OIR    2025130    131400  -10.2200 -137.7000      30.3         5       115        60
OIR    2025130    131400  -10.2200 -137.7100      30.2         4       114        60
OIR    2025130    131400  -10.2200 -137.7200      30.1         3       115        60
OIR    2025130    131400  -10.2200 -137.7300      29.7         2       115        60
OIR    2025130    131400  -10.2200 -137.7400      29.2       359       116        60
OIR    2025130    131400  -10.2200 -137.7500      28.8       357       117        60
OIR    2025130    131400  -10.2200 -137.7600      28.6       356       119        60
OIR    2025130    131400  -10.2200 -137.7700      28.6       356       119        60
OIR    2025130    131400  -10.2200 -137.7800      28.5       356       120        60
OIR    2025130    131400  -10.2200 -137.7900      28.5       355       124        60
OIR    2025130    131400  -10.2200 -137.8000      28.4       355       125        60
OIR    2025130    131400  -10.2200 -137.8100      28.3       355       124        60
OIR    2025130    131400  -10.2200 -137.8200      28.2       354       123        60
OIR    2025130    131400  -10.2200 -137.8300      28.1       354       122        60
OIR    2025130    131400  -10.2200 -137.8400      28.1       354       122        60
OIR    2025130    131400  -10.2200 -137.8500      28.0       353       123        60
OIR    2025130    131400  -10.2200 -137.8600      28.0       353       124        60
OIR    2025130    131400  -10.2200 -137.8700      28.0       353       125        60
OIR    2025130    131400  -10.2200 -137.8800      27.9       353       126        60
OIR    2025130    131400  -10.2200 -137.8900      27.8       352       126        60
OIR    2025130    131400  -10.2200 -137.9000      27.7       352       127        60
OIR    2025130    131400  -10.2200 -137.9100      27.4       352       128        60
OIR    2025130    131400  -10.2200 -137.9200      27.1       351       129        60
OIR    2025130    131400  -10.2200 -137.9300      26.7       350       130        60
OIR    2025130    131400  -10.2200 -137.9400      26.3       349       130        60
OIR    2025130    131400  -10.2200 -137.9500      26.0       349       132        60
OIR    2025130    131400  -10.2200 -137.9600      25.8       348       134        60
OIR    2025130    131400  -10.2200 -137.9700      25.8       348       136        60
OIR    2025130    131400  -10.2200 -137.9800      25.8       347       139        60
OIR    2025130    131400  -10.2200 -137.9900      26.1       346       139        60
OIR    2025130    131400  -10.2200 -138.0000      26.4       345       139        60
OIR    2025130    131400  -10.2200 -138.0100      26.8       344       138        60
OIR    2025130    131400  -10.2200 -138.0200      27.4       343       137        60
OIR    2025130    131400  -10.2200 -138.0300      27.6       343       137        60
OIR    2025130    131400  -10.2200 -138.0400      27.7       343       136        60
OIR    2025130    131400  -10.2200 -138.0500      27.8       343       135        60
OIR    2025130    131400  -10.2200 -138.0600      27.9       342       135        60
OIR    2025130    131400  -10.2200 -138.0700      27.9       342       134        60
OIR    2025130    131400  -10.2200 -138.0800      27.9       342       134        60
OIR    2025130    131400  -10.2200 -138.0900      28.0       342       135        60
OIR    2025130    131400  -10.2200 -138.1000      28.0       342       135        60
OIR    2025130    131400  -10.2200 -138.1100      28.0       342       136        60
OIR    2025130    131400  -10.2200 -138.1200      28.0       342       137        60
OIR    2025130    131400  -10.2200 -138.1300      28.0       342       138        60
OIR    2025130    131400  -10.2200 -138.1400      28.0       342       138        60
OIR    2025130    131400  -10.2200 -138.1500      28.0       342       138        60
OIR    2025130    131400  -10.2200 -138.1600      28.1       342       137        60
OIR    2025130    131400  -10.2200 -138.1700      28.1       342       136        60
OIR    2025130    131400  -10.2200 -138.1800      28.1       342       135        60
OIR    2025130    131400  -10.2200 -138.1900      28.1       342       132        60
OIR    2025130    131400  -10.2200 -138.2000      28.1       342       130        60
OIR    2025130    131400  -10.2200 -138.2100      28.1       342       129        60
OIR    2025130    131400  -10.2200 -138.2200      28.1       342       129        60
OIR    2025130    131400  -10.2200 -138.2300      28.1       341       131        60
OIR    2025130    131400  -10.2200 -138.2400      28.1       341       132        60
OIR    2025130    131400  -10.2200 -138.2500      28.0       341       133        60
OIR    2025130    131400  -10.2200 -138.2600      27.9       340       134        60
OIR    2025130    131400  -10.2200 -138.2700      27.7       340       137        60
OIR    2025130    131400  -10.2200 -138.2800      27.6       339       143        60
OIR    2025130    131400  -10.2200 -138.2900      27.5       339       148        60
OIR    2025130    131400  -10.2200 -138.3000      27.5       339       149        60
OIR    2025130    131400  -10.2200 -138.3200      27.5       339       147        60
OIR    2025130    131400  -10.2200 -138.3300      27.5       339       146        60
OIR    2025130    131400  -10.2200 -138.3400      27.5       339       147        60
OIR    2025130    131400  -10.2200 -138.3500      27.5       339       147        60
OIR    2025130    131400  -10.2200 -138.3600      27.6       339       147        60
OIR    2025130    131400  -10.2200 -138.3700      27.6       339       148        60
OIR    2025130    131400  -10.2300 -136.1600      38.1        53       149        60
OIR    2025130    131400  -10.2300 -136.2000      39.7        52       148        60
OIR    2025130    131400  -10.2300 -136.2100      40.2        51       146        60
OIR    2025130    131400  -10.2300 -136.2200      40.7        50       144        60
OIR    2025130    131400  -10.2300 -136.2300      41.3        50       143        60
OIR    2025130    131400  -10.2300 -136.2400      42.0        50       143        60
OIR    2025130    131400  -10.2300 -136.2500      42.3        49       142        60
OIR    2025130    131400  -10.2300 -136.2600      42.4        49       142        60
OIR    2025130    131400  -10.2300 -136.2700      42.5        50       142        60
OIR    2025130    131400  -10.2300 -136.2800      42.7        50       139        60
OIR    2025130    131400  -10.2300 -136.2900      42.9        50       136        60
OIR    2025130    131400  -10.2300 -136.3000      43.1        50       135        60
OIR    2025130    131400  -10.2300 -136.3100      43.3        50       134        60
OIR    2025130    131400  -10.2300 -136.3200      43.4        50       137        60
OIR    2025130    131400  -10.2300 -136.3300      43.6        50       141        60
OIR    2025130    131400  -10.2300 -136.3400      43.6        50       147        60
OIR    2025130    131400  -10.2300 -136.3800      42.1        51       145        60
OIR    2025130    131400  -10.2300 -136.3900      41.8        50       144        60
OIR    2025130    131400  -10.2300 -136.4000      41.2        50       145        60
OIR    2025130    131400  -10.2300 -136.4100      40.3        49       140        60
OIR    2025130    131400  -10.2300 -136.4200      39.0        48       136        60
OIR    2025130    131400  -10.2300 -136.4300      38.4        47       134        60
OIR    2025130    131400  -10.2300 -136.4400      38.2        46       132        60
OIR    2025130    131400  -10.2300 -136.4500      38.2        46       130        60
OIR    2025130    131400  -10.2300 -136.4600      38.2        46       129        60
OIR    2025130    131400  -10.2300 -136.4700      38.3        46       129        60
OIR    2025130    131400  -10.2300 -136.4800      38.3        46       129        60
OIR    2025130    131400  -10.2300 -136.4900      38.3        46       128        60
OIR    2025130    131400  -10.2300 -136.5000      38.3        46       127        60
OIR    2025130    131400  -10.2300 -136.5100      38.3        46       127        60
OIR    2025130    131400  -10.2300 -136.5200      38.3        46       129        60
OIR    2025130    131400  -10.2300 -136.5300      38.4        46       131        60
OIR    2025130    131400  -10.2300 -136.5400      38.4        46       129        60
OIR    2025130    131400  -10.2300 -136.5500      38.4        46       127        60
OIR    2025130    131400  -10.2300 -136.5600      38.4        46       127        60
OIR    2025130    131400  -10.2300 -136.5700      38.4        46       126        60
OIR    2025130    131400  -10.2300 -136.5800      38.4        46       124        60
OIR    2025130    131400  -10.2300 -136.5900      38.4        46       123        60
OIR    2025130    131400  -10.2300 -136.6000      38.4        46       125        60
OIR    2025130    131400  -10.2300 -136.6100      38.4        46       127        60
OIR    2025130    131400  -10.2300 -136.6200      38.4        46       129        60
OIR    2025130    131400  -10.2300 -136.6300      38.4        46       130        60
OIR    2025130    131400  -10.2300 -136.6400      38.4        46       131        60
OIR    2025130    131400  -10.2300 -136.6500      38.4        46       131        60
OIR    2025130    131400  -10.2300 -136.6600      38.4        46       130        60
OIR    2025130    131400  -10.2300 -136.6700      38.4        46       130        60
OIR    2025130    131400  -10.2300 -136.6800      38.4        46       129        60
OIR    2025130    131400  -10.2300 -136.6900      38.3        46       127        60
OIR    2025130    131400  -10.2300 -136.7000      38.3        46       127        60
OIR    2025130    131400  -10.2300 -136.7100      38.2        46       127        60
OIR    2025130    131400  -10.2300 -136.7200      38.1        46       126        60
OIR    2025130    131400  -10.2300 -136.7300      38.1        45       125        60
OIR    2025130    131400  -10.2300 -136.7400      38.0        45       123        60
OIR    2025130    131400  -10.2300 -136.7500      37.9        44       122        60
OIR    2025130    131400  -10.2300 -136.7600      37.8        44       120        60
OIR    2025130    131400  -10.2300 -136.7700      37.8        43       120        60
OIR    2025130    131400  -10.2300 -136.7800      37.7        42       122        60
OIR    2025130    131400  -10.2300 -136.7900      37.3        41       123        60
OIR    2025130    131400  -10.2300 -136.8000      37.1        40       123        60
OIR    2025130    131400  -10.2300 -136.8100      37.1        40       122        60
OIR    2025130    131400  -10.2300 -136.8200      37.0        40       119        60
OIR    2025130    131400  -10.2300 -136.8300      37.0        40       120        60
OIR    2025130    131400  -10.2300 -136.8400      37.0        39       121        60
OIR    2025130    131400  -10.2300 -136.8500      37.0        38       124        60
OIR    2025130    131400  -10.2300 -136.8600      37.0        37       129        60
OIR    2025130    131400  -10.2300 -136.8700      36.8        34       129        60
OIR    2025130    131400  -10.2300 -136.8800      36.9        33       130        60
OIR    2025130    131400  -10.2300 -136.8900      37.0        31       133        60
OIR    2025130    131400  -10.2300 -136.9000      36.9        31       137        60
OIR    2025130    131400  -10.2300 -136.9100      34.3        29       140        60
OIR    2025130    131400  -10.2300 -136.9200      33.5        29       137        60
OIR    2025130    131400  -10.2300 -136.9300      32.8        30       126        60
OIR    2025130    131400  -10.2300 -136.9400      32.2        31       123        60
OIR    2025130    131400  -10.2300 -136.9500      32.0        31       121        60
OIR    2025130    131400  -10.2300 -136.9600      32.0        31       120        60
OIR    2025130    131400  -10.2300 -136.9700      32.0        31       120        60
OIR    2025130    131400  -10.2300 -136.9800      32.0        31       119        60
OIR    2025130    131400  -10.2300 -136.9900      32.0        31       117        60
OIR    2025130    131400  -10.2300 -137.0000      32.3        30       114        60
OIR    2025130    131400  -10.2300 -137.0100      33.2        30       110        60
OIR    2025130    131400  -10.2300 -137.0200      33.9        29       110        60
OIR    2025130    131400  -10.2300 -137.0300      34.0        29       111        60
OIR    2025130    131400  -10.2300 -137.0400      33.9        29       115        60
OIR    2025130    131400  -10.2300 -137.0500      33.6        29       116        60
OIR    2025130    131400  -10.2300 -137.0600      33.4        29       119        60
OIR    2025130    131400  -10.2300 -137.0700      33.4        29       120        60
OIR    2025130    131400  -10.2300 -137.0800      33.5        29       121        60
OIR    2025130    131400  -10.2300 -137.0900      33.5        29       116        60
OIR    2025130    131400  -10.2300 -137.1000      33.5        30       112        60
OIR    2025130    131400  -10.2300 -137.1100      33.2        31       109        60
OIR    2025130    131400  -10.2300 -137.1200      33.3        32       108        60
OIR    2025130    131400  -10.2300 -137.1300      33.8        34       108        60
OIR    2025130    131400  -10.2300 -137.1400      34.7        35       109        60
OIR    2025130    131400  -10.2300 -137.1500      35.4        35       110        60
OIR    2025130    131400  -10.2300 -137.1600      36.2        35       116        60
OIR    2025130    131400  -10.2300 -137.1700      36.4        32       122        60
OIR    2025130    131400  -10.2300 -137.1800      36.7        32       123        60
OIR    2025130    131400  -10.2300 -137.1900      36.4        31       121        60
OIR    2025130    131400  -10.2300 -137.2000      36.3        31       117        60
OIR    2025130    131400  -10.2300 -137.2100      36.4        31       116        60
OIR    2025130    131400  -10.2300 -137.2200      36.7        31       116        60
OIR    2025130    131400  -10.2300 -137.2300      37.1        30       115        60
OIR    2025130    131400  -10.2300 -137.2400      37.4        28       115        60
OIR    2025130    131400  -10.2300 -137.2500      37.0        24       112        60
OIR    2025130    131400  -10.2300 -137.2600      36.4        22       107        60
OIR    2025130    131400  -10.2300 -137.2700      35.8        20       105        60
OIR    2025130    131400  -10.2300 -137.2800      35.4        19       107        60
OIR    2025130    131400  -10.2300 -137.2900      35.3        18       108        60
OIR    2025130    131400  -10.2300 -137.3000      35.2        18       108        60
OIR    2025130    131400  -10.2300 -137.3100      35.1        18       105        60
OIR    2025130    131400  -10.2300 -137.3200      34.7        17       104        60
OIR    2025130    131400  -10.2300 -137.3300      34.3        16       104        60
OIR    2025130    131400  -10.2300 -137.3400      34.1        15       104        60
OIR    2025130    131400  -10.2300 -137.3500      33.9        14       104        60
OIR    2025130    131400  -10.2300 -137.3600      33.8        13       104        60
OIR    2025130    131400  -10.2300 -137.3700      33.8        13       104        60
OIR    2025130    131400  -10.2300 -137.3800      33.8        13       104        60
OIR    2025130    131400  -10.2300 -137.3900      33.8        13       103        60
OIR    2025130    131400  -10.2300 -137.4000      33.7        13       104        60
OIR    2025130    131400  -10.2300 -137.4100      33.5        12       105        60
OIR    2025130    131400  -10.2300 -137.4200      33.1        12       105        60
OIR    2025130    131400  -10.2300 -137.4300      32.5        11       104        60
OIR    2025130    131400  -10.2300 -137.4400      31.9        11       104        60
OIR    2025130    131400  -10.2300 -137.4500      31.2        10       104        60
OIR    2025130    131400  -10.2300 -137.4600      30.8         9       104        60
OIR    2025130    131400  -10.2300 -137.4700      30.6         8       108        60
OIR    2025130    131400  -10.2300 -137.4800      30.5         8       111        60
OIR    2025130    131400  -10.2300 -137.4900      30.4         7       112        60
OIR    2025130    131400  -10.2300 -137.5000      30.4         6       107        60
OIR    2025130    131400  -10.2300 -137.5100      30.4         6       104        60
OIR    2025130    131400  -10.2300 -137.5200      30.3         6       103        60
OIR    2025130    131400  -10.2300 -137.5300      30.3         6       103        60
OIR    2025130    131400  -10.2300 -137.5400      30.2         6       103        60
OIR    2025130    131400  -10.2300 -137.5500      30.2         6       103        60
OIR    2025130    131400  -10.2300 -137.5600      30.2         6       103        60
OIR    2025130    131400  -10.2300 -137.5700      30.2         6       105        60
OIR    2025130    131400  -10.2300 -137.5800      30.2         5       110        60
OIR    2025130    131400  -10.2300 -137.5900      30.3         5       115        60
OIR    2025130    131400  -10.2300 -137.6000      30.3         5       117        60
OIR    2025130    131400  -10.2300 -137.6100      30.3         5       119        60
OIR    2025130    131400  -10.2300 -137.6200      30.3         5       119        60
OIR    2025130    131400  -10.2300 -137.6300      30.3         5       117        60
OIR    2025130    131400  -10.2300 -137.6400      30.3         5       117        60
OIR    2025130    131400  -10.2300 -137.6500      30.3         5       116        60
OIR    2025130    131400  -10.2300 -137.6600      30.3         5       119        60
OIR    2025130    131400  -10.2300 -137.6700      30.2         5       120        60
OIR    2025130    131400  -10.2300 -137.6800      30.2         5       116        60
OIR    2025130    131400  -10.2300 -137.6900      30.2         5       114        60
OIR    2025130    131400  -10.2300 -137.7000      30.2         5       113        60
OIR    2025130    131400  -10.2300 -137.7100      30.1         4       113        60
OIR    2025130    131400  -10.2300 -137.7200      29.9         3       113        60
OIR    2025130    131400  -10.2300 -137.7300      29.5         2       114        60
OIR    2025130    131400  -10.2300 -137.7400      28.9       360       116        60
OIR    2025130    131400  -10.2300 -137.7500      28.6       358       116        60
OIR    2025130    131400  -10.2300 -137.7600      28.4       357       119        60
OIR    2025130    131400  -10.2300 -137.7700      28.4       356       119        60
OIR    2025130    131400  -10.2300 -137.7800      28.3       356       120        60
OIR    2025130    131400  -10.2300 -137.7900      28.3       356       124        60
OIR    2025130    131400  -10.2300 -137.8000      28.2       355       125        60
OIR    2025130    131400  -10.2300 -137.8100      28.1       355       123        60
OIR    2025130    131400  -10.2300 -137.8200      28.0       355       122        60
OIR    2025130    131400  -10.2300 -137.8300      27.9       354       121        60
OIR    2025130    131400  -10.2300 -137.8400      27.9       354       121        60
OIR    2025130    131400  -10.2300 -137.8500      27.9       353       121        60
OIR    2025130    131400  -10.2300 -137.8600      27.9       353       122        60
OIR    2025130    131400  -10.2300 -137.8700      27.8       353       123        60
OIR    2025130    131400  -10.2300 -137.8800      27.7       353       124        60
OIR    2025130    131400  -10.2300 -137.8900      27.6       353       125        60
OIR    2025130    131400  -10.2300 -137.9000      27.4       352       125        60
OIR    2025130    131400  -10.2300 -137.9100      27.1       352       126        60
OIR    2025130    131400  -10.2300 -137.9200      26.7       351       128        60
OIR    2025130    131400  -10.2300 -137.9300      26.3       350       130        60
OIR    2025130    131400  -10.2300 -137.9400      26.0       349       131        60
OIR    2025130    131400  -10.2300 -137.9500      25.8       349       133        60
OIR    2025130    131400  -10.2300 -137.9600      25.7       348       135        60
OIR    2025130    131400  -10.2300 -137.9700      25.7       348       137        60
OIR    2025130    131400  -10.2300 -137.9800      25.8       347       139        60
OIR    2025130    131400  -10.2300 -137.9900      26.1       346       139        60
OIR    2025130    131400  -10.2300 -138.0000      26.3       345       140        60
OIR    2025130    131400  -10.2300 -138.0100      26.7       345       138        60
OIR    2025130    131400  -10.2300 -138.0200      27.1       344       138        60
OIR    2025130    131400  -10.2300 -138.0300      27.4       343       139        60
OIR    2025130    131400  -10.2300 -138.0400      27.7       343       139        60
OIR    2025130    131400  -10.2300 -138.0500      27.8       343       137        60
OIR    2025130    131400  -10.2300 -138.0600      27.8       343       136        60
OIR    2025130    131400  -10.2300 -138.0700      27.9       342       136        60
OIR    2025130    131400  -10.2300 -138.0800      27.9       342       136        60
OIR    2025130    131400  -10.2300 -138.0900      27.9       342       137        60
OIR    2025130    131400  -10.2300 -138.1000      28.0       342       136        60
OIR    2025130    131400  -10.2300 -138.1100      28.0       342       136        60
OIR    2025130    131400  -10.2300 -138.1200      28.0       342       138        60
OIR    2025130    131400  -10.2300 -138.1300      28.0       342       139        60
OIR    2025130    131400  -10.2300 -138.1400      28.0       342       139        60
OIR    2025130    131400  -10.2300 -138.1500      28.0       342       139        60
OIR    2025130    131400  -10.2300 -138.1600      28.1       342       138        60
OIR    2025130    131400  -10.2300 -138.1700      28.1       342       136        60
OIR    2025130    131400  -10.2300 -138.1800      28.1       342       135        60
OIR    2025130    131400  -10.2300 -138.1900      28.1       342       132        60
OIR    2025130    131400  -10.2300 -138.2000      28.1       342       129        60
OIR    2025130    131400  -10.2300 -138.2100      28.1       342       129        60
OIR    2025130    131400  -10.2300 -138.2200      28.1       342       129        60
OIR    2025130    131400  -10.2300 -138.2300      28.1       341       130        60
OIR    2025130    131400  -10.2300 -138.2400      28.1       341       131        60
OIR    2025130    131400  -10.2300 -138.2500      28.1       341       132        60
OIR    2025130    131400  -10.2300 -138.2600      28.1       341       133        60
OIR    2025130    131400  -10.2300 -138.2700      28.1       340       137        60
OIR    2025130    131400  -10.2300 -138.2800      28.0       340       142        60
OIR    2025130    131400  -10.2300 -138.2900      28.0       340       147        60
OIR    2025130    131400  -10.2300 -138.3000      27.9       339       146        60
OIR    2025130    131400  -10.2300 -138.3100      27.8       339       145        60
OIR    2025130    131400  -10.2300 -138.3200      27.7       339       144        60
OIR    2025130    131400  -10.2300 -138.3300      27.7       339       144        60
OIR    2025130    131400  -10.2300 -138.3400      27.7       339       145        60
OIR    2025130    131400  -10.2300 -138.3500      27.9       339       146        60
OIR    2025130    131400  -10.2300 -138.3600      28.1       339       145        60
OIR    2025130    131400  -10.2300 -138.3700      28.2       339       146        60
OIR    2025130    131400  -10.2400 -136.2100      40.1        50       146        60
OIR    2025130    131400  -10.2400 -136.2200      40.6        50       143        60
OIR    2025130    131400  -10.2400 -136.2300      41.0        49       140        60
OIR    2025130    131400  -10.2400 -136.2400      41.9        49       139        60
OIR    2025130    131400  -10.2400 -136.2500      42.3        49       140        60
OIR    2025130    131400  -10.2400 -136.2600      42.5        49       139        60
OIR    2025130    131400  -10.2400 -136.2700      42.7        49       138        60
OIR    2025130    131400  -10.2400 -136.2800      42.9        49       137        60
OIR    2025130    131400  -10.2400 -136.2900      43.1        50       135        60
OIR    2025130    131400  -10.2400 -136.3000      43.4        50       137        60
OIR    2025130    131400  -10.2400 -136.3100      43.8        50       139        60
OIR    2025130    131400  -10.2400 -136.3200      44.1        49       138        60
OIR    2025130    131400  -10.2400 -136.3300      44.3        49       140        60
OIR    2025130    131400  -10.2400 -136.3400      44.3        49       147        60
OIR    2025130    131400  -10.2400 -136.3800      42.0        50       145        60
OIR    2025130    131400  -10.2400 -136.3900      41.5        50       143        60
OIR    2025130    131400  -10.2400 -136.4000      40.7        49       142        60
OIR    2025130    131400  -10.2400 -136.4100      39.6        48       140        60
OIR    2025130    131400  -10.2400 -136.4200      38.5        47       137        60
OIR    2025130    131400  -10.2400 -136.4300      38.2        47       136        60
OIR    2025130    131400  -10.2400 -136.4400      38.1        46       134        60
OIR    2025130    131400  -10.2400 -136.4500      38.1        46       131        60
OIR    2025130    131400  -10.2400 -136.4600      38.2        46       129        60
OIR    2025130    131400  -10.2400 -136.4700      38.2        46       128        60
OIR    2025130    131400  -10.2400 -136.4800      38.3        46       127        60
OIR    2025130    131400  -10.2400 -136.4900      38.3        46       127        60
OIR    2025130    131400  -10.2400 -136.5000      38.3        46       128        60
OIR    2025130    131400  -10.2400 -136.5100      38.3        46       130        60
OIR    2025130    131400  -10.2400 -136.5200      38.3        46       130        60
OIR    2025130    131400  -10.2400 -136.5300      38.4        46       131        60
OIR    2025130    131400  -10.2400 -136.5400      38.4        46       129        60
OIR    2025130    131400  -10.2400 -136.5500      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.5600      38.4        46       129        60
OIR    2025130    131400  -10.2400 -136.5700      38.4        46       129        60
OIR    2025130    131400  -10.2400 -136.5800      38.4        46       128        60
OIR    2025130    131400  -10.2400 -136.5900      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6000      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6100      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6200      38.4        46       128        60
OIR    2025130    131400  -10.2400 -136.6300      38.4        46       129        60
OIR    2025130    131400  -10.2400 -136.6400      38.4        46       129        60
OIR    2025130    131400  -10.2400 -136.6500      38.4        46       128        60
OIR    2025130    131400  -10.2400 -136.6600      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6700      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6800      38.4        46       127        60
OIR    2025130    131400  -10.2400 -136.6900      38.3        46       126        60
OIR    2025130    131400  -10.2400 -136.7000      38.3        46       125        60
OIR    2025130    131400  -10.2400 -136.7100      38.2        46       125        60
OIR    2025130    131400  -10.2400 -136.7200      38.1        46       123        60
OIR    2025130    131400  -10.2400 -136.7300      38.1        45       121        60
OIR    2025130    131400  -10.2400 -136.7400      38.0        44       122        60
OIR    2025130    131400  -10.2400 -136.7500      38.0        44       122        60
OIR    2025130    131400  -10.2400 -136.7600      38.0        43       122        60
OIR    2025130    131400  -10.2400 -136.7700      37.9        42       122        60
OIR    2025130    131400  -10.2400 -136.7800      37.8        42       122        60
OIR    2025130    131400  -10.2400 -136.7900      37.6        41       123        60
OIR    2025130    131400  -10.2400 -136.8000      37.3        40       124        60
OIR    2025130    131400  -10.2400 -136.8100      37.2        40       124        60
OIR    2025130    131400  -10.2400 -136.8200      37.2        40       123        60
OIR    2025130    131400  -10.2400 -136.8300      37.2        39       122        60
OIR    2025130    131400  -10.2400 -136.8400      37.1        39       121        60
OIR    2025130    131400  -10.2400 -136.8500      37.1        37       124        60
OIR    2025130    131400  -10.2400 -136.8600      37.3        36       128        60
OIR    2025130    131400  -10.2400 -136.8700      37.1        34       130        60
OIR    2025130    131400  -10.2400 -136.8800      37.1        33       132        60
OIR    2025130    131400  -10.2400 -136.8900      37.1        31       134        60
OIR    2025130    131400  -10.2400 -136.9000      36.8        30       136        60
OIR    2025130    131400  -10.2400 -136.9100      33.8        28       142        60
OIR    2025130    131400  -10.2400 -136.9200      33.5        29       141        60
OIR    2025130    131400  -10.2400 -136.9300      33.0        29       132        60
OIR    2025130    131400  -10.2400 -136.9400      32.4        30       128        60
OIR    2025130    131400  -10.2400 -136.9500      32.1        31       126        60
OIR    2025130    131400  -10.2400 -136.9600      32.0        31       125        60
OIR    2025130    131400  -10.2400 -136.9700      32.0        31       126        60
OIR    2025130    131400  -10.2400 -136.9800      32.0        31       124        60
OIR    2025130    131400  -10.2400 -136.9900      32.1        31       121        60
OIR    2025130    131400  -10.2400 -137.0000      32.5        30       115        60
OIR    2025130    131400  -10.2400 -137.0100      33.2        29       110        60
OIR    2025130    131400  -10.2400 -137.0200      33.9        29       110        60
OIR    2025130    131400  -10.2400 -137.0300      33.9        29       111        60
OIR    2025130    131400  -10.2400 -137.0400      33.8        29       114        60
OIR    2025130    131400  -10.2400 -137.0500      33.6        29       114        60
OIR    2025130    131400  -10.2400 -137.0600      33.5        28       114        60
OIR    2025130    131400  -10.2400 -137.0700      33.5        28       116        60
OIR    2025130    131400  -10.2400 -137.0800      33.4        28       119        60
OIR    2025130    131400  -10.2400 -137.0900      33.2        28       116        60
OIR    2025130    131400  -10.2400 -137.1000      32.9        28       114        60
OIR    2025130    131400  -10.2400 -137.1100      32.8        28       111        60
OIR    2025130    131400  -10.2400 -137.1200      32.9        30       108        60
OIR    2025130    131400  -10.2400 -137.1300      33.5        33       111        60
OIR    2025130    131400  -10.2400 -137.1400      34.4        34       113        60
OIR    2025130    131400  -10.2400 -137.1500      35.0        35       115        60
OIR    2025130    131400  -10.2400 -137.1600      35.6        35       119        60
OIR    2025130    131400  -10.2400 -137.1700      36.2        31       124        60
OIR    2025130    131400  -10.2400 -137.1800      36.6        29       124        60
OIR    2025130    131400  -10.2400 -137.1900      36.6        27       119        60
OIR    2025130    131400  -10.2400 -137.2000      36.1        27       116        60
OIR    2025130    131400  -10.2400 -137.2100      35.8        27       115        60
OIR    2025130    131400  -10.2400 -137.2200      36.3        26       116        60
OIR    2025130    131400  -10.2400 -137.2300      37.0        24       116        60
OIR    2025130    131400  -10.2400 -137.2400      37.5        23       116        60
OIR    2025130    131400  -10.2400 -137.2500      37.2        21       113        60
OIR    2025130    131400  -10.2400 -137.2600      36.6        20       108        60
OIR    2025130    131400  -10.2400 -137.2700      36.1        19       107        60
OIR    2025130    131400  -10.2400 -137.2800      35.7        19       105        60
OIR    2025130    131400  -10.2400 -137.2900      35.5        18       107        60
OIR    2025130    131400  -10.2400 -137.3000      35.4        18       107        60
OIR    2025130    131400  -10.2400 -137.3100      35.2        18       105        60
OIR    2025130    131400  -10.2400 -137.3200      34.8        17       104        60
OIR    2025130    131400  -10.2400 -137.3300      34.4        16       104        60
OIR    2025130    131400  -10.2400 -137.3400      34.2        15       104        60
OIR    2025130    131400  -10.2400 -137.3500      33.9        14       104        60
OIR    2025130    131400  -10.2400 -137.3600      33.9        13       103        60
OIR    2025130    131400  -10.2400 -137.3700      33.9        13       104        60
OIR    2025130    131400  -10.2400 -137.3800      33.8        13       104        60
OIR    2025130    131400  -10.2400 -137.3900      33.7        12       103        60
OIR    2025130    131400  -10.2400 -137.4000      33.6        12       104        60
OIR    2025130    131400  -10.2400 -137.4100      33.4        12       107        60
OIR    2025130    131400  -10.2400 -137.4200      33.2        11       105        60
OIR    2025130    131400  -10.2400 -137.4300      32.6        11       104        60
OIR    2025130    131400  -10.2400 -137.4400      32.0        10       104        60
OIR    2025130    131400  -10.2400 -137.4500      31.4        10       104        60
OIR    2025130    131400  -10.2400 -137.4600      31.0         9       104        60
OIR    2025130    131400  -10.2400 -137.4700      30.8         8       108        60
OIR    2025130    131400  -10.2400 -137.4800      30.6         7       110        60
OIR    2025130    131400  -10.2400 -137.4900      30.5         6       111        60
OIR    2025130    131400  -10.2400 -137.5000      30.5         6       105        60
OIR    2025130    131400  -10.2400 -137.5100      30.4         6       104        60
OIR    2025130    131400  -10.2400 -137.5200      30.4         6       103        60
OIR    2025130    131400  -10.2400 -137.5300      30.3         6       103        60
OIR    2025130    131400  -10.2400 -137.5400      30.3         6       103        60
OIR    2025130    131400  -10.2400 -137.5500      30.2         6       103        60
OIR    2025130    131400  -10.2400 -137.5600      30.2         6       103        60
OIR    2025130    131400  -10.2400 -137.5700      30.2         6       105        60
OIR    2025130    131400  -10.2400 -137.5800      30.3         6       110        60
OIR    2025130    131400  -10.2400 -137.5900      30.3         5       113        60
OIR    2025130    131400  -10.2400 -137.6000      30.3         5       116        60
OIR    2025130    131400  -10.2400 -137.6100      30.3         5       117        60
OIR    2025130    131400  -10.2400 -137.6200      30.3         5       117        60
OIR    2025130    131400  -10.2400 -137.6300      30.3         5       116        60
OIR    2025130    131400  -10.2400 -137.6400      30.3         5       116        60
OIR    2025130    131400  -10.2400 -137.6500      30.3         5       116        60
OIR    2025130    131400  -10.2400 -137.6600      30.3         5       116        60
OIR    2025130    131400  -10.2400 -137.6700      30.2         5       116        60
OIR    2025130    131400  -10.2400 -137.6800      30.2         5       114        60
OIR    2025130    131400  -10.2400 -137.6900      30.2         5       113        60
OIR    2025130    131400  -10.2400 -137.7000      30.2         5       112        60
OIR    2025130    131400  -10.2400 -137.7100      30.1         4       111        60
OIR    2025130    131400  -10.2400 -137.7200      29.8         3       112        60
OIR    2025130    131400  -10.2400 -137.7300      29.2         2       114        60
OIR    2025130    131400  -10.2400 -137.7400      28.7         0       116        60
OIR    2025130    131400  -10.2400 -137.7500      28.4       359       117        60
OIR    2025130    131400  -10.2400 -137.7600      28.3       358       120        60
OIR    2025130    131400  -10.2400 -137.7700      28.2       357       120        60
OIR    2025130    131400  -10.2400 -137.7800      28.1       356       120        60
OIR    2025130    131400  -10.2400 -137.7900      28.1       356       122        60
OIR    2025130    131400  -10.2400 -137.8000      28.0       355       123        60
OIR    2025130    131400  -10.2400 -137.8100      27.8       355       122        60
OIR    2025130    131400  -10.2400 -137.8200      27.7       355       122        60
OIR    2025130    131400  -10.2400 -137.8300      27.6       354       121        60
OIR    2025130    131400  -10.2400 -137.8400      27.6       354       121        60
OIR    2025130    131400  -10.2400 -137.8500      27.6       354       121        60
OIR    2025130    131400  -10.2400 -137.8600      27.5       353       121        60
OIR    2025130    131400  -10.2400 -137.8700      27.4       353       122        60
OIR    2025130    131400  -10.2400 -137.8800      27.2       353       123        60
OIR    2025130    131400  -10.2400 -137.8900      27.0       353       124        60
OIR    2025130    131400  -10.2400 -137.9000      26.8       352       124        60
OIR    2025130    131400  -10.2400 -137.9100      26.5       352       126        60
OIR    2025130    131400  -10.2400 -137.9200      26.1       351       128        60
OIR    2025130    131400  -10.2400 -137.9300      25.9       350       130        60
OIR    2025130    131400  -10.2400 -137.9400      25.7       349       132        60
OIR    2025130    131400  -10.2400 -137.9500      25.6       349       135        60
OIR    2025130    131400  -10.2400 -137.9600      25.6       348       138        60
OIR    2025130    131400  -10.2400 -137.9700      25.6       348       138        60
OIR    2025130    131400  -10.2400 -137.9800      25.8       347       139        60
OIR    2025130    131400  -10.2400 -137.9900      26.1       346       140        60
OIR    2025130    131400  -10.2400 -138.0000      26.3       345       141        60
OIR    2025130    131400  -10.2400 -138.0100      26.6       345       139        60
OIR    2025130    131400  -10.2400 -138.0200      26.9       344       139        60
OIR    2025130    131400  -10.2400 -138.0300      27.3       343       141        60
OIR    2025130    131400  -10.2400 -138.0400      27.6       343       140        60
OIR    2025130    131400  -10.2400 -138.0500      27.7       343       138        60
OIR    2025130    131400  -10.2400 -138.0600      27.8       343       137        60
OIR    2025130    131400  -10.2400 -138.0700      27.8       342       137        60
OIR    2025130    131400  -10.2400 -138.0800      27.9       342       138        60
OIR    2025130    131400  -10.2400 -138.0900      27.9       342       139        60
OIR    2025130    131400  -10.2400 -138.1000      27.9       342       136        60
OIR    2025130    131400  -10.2400 -138.1100      28.0       342       135        60
OIR    2025130    131400  -10.2400 -138.1200      28.0       342       137        60
OIR    2025130    131400  -10.2400 -138.1300      28.0       342       139        60
OIR    2025130    131400  -10.2400 -138.1400      28.0       342       139        60
OIR    2025130    131400  -10.2400 -138.1500      28.0       342       139        60
OIR    2025130    131400  -10.2400 -138.1600      28.1       342       139        60
OIR    2025130    131400  -10.2400 -138.1700      28.1       342       136        60
OIR    2025130    131400  -10.2400 -138.1800      28.1       342       133        60
OIR    2025130    131400  -10.2400 -138.1900      28.1       342       130        60
OIR    2025130    131400  -10.2400 -138.2000      28.1       342       127        60
OIR    2025130    131400  -10.2400 -138.2100      28.1       342       129        60
OIR    2025130    131400  -10.2400 -138.2200      28.1       342       131        60
OIR    2025130    131400  -10.2400 -138.2300      28.2       342       131        60
OIR    2025130    131400  -10.2400 -138.2400      28.2       341       131        60
OIR    2025130    131400  -10.2400 -138.2500      28.3       341       132        60
OIR    2025130    131400  -10.2400 -138.2600      28.3       341       134        60
OIR    2025130    131400  -10.2400 -138.2700      28.3       341       137        60
OIR    2025130    131400  -10.2400 -138.2800      28.3       341       141        60
OIR    2025130    131400  -10.2400 -138.2900      28.3       340       145        60
OIR    2025130    131400  -10.2400 -138.3000      28.2       340       144        60
OIR    2025130    131400  -10.2400 -138.3100      28.2       340       143        60
OIR    2025130    131400  -10.2400 -138.3200      28.1       340       141        60
OIR    2025130    131400  -10.2400 -138.3300      28.0       339       140        60
OIR    2025130    131400  -10.2400 -138.3400      28.1       339       141        60
OIR    2025130    131400  -10.2400 -138.3500      28.4       339       142        60
OIR    2025130    131400  -10.2400 -138.3600      28.6       340       142        60
OIR    2025130    131400  -10.2400 -138.3700      28.7       340       145        60
OIR    2025130    131400  -10.2500 -136.2100      39.7        50       147        60
OIR    2025130    131400  -10.2500 -136.2200      40.5        49       142        60
OIR    2025130    131400  -10.2500 -136.2300      40.7        49       138        60
OIR    2025130    131400  -10.2500 -136.2400      41.7        48       136        60
OIR    2025130    131400  -10.2500 -136.2500      42.3        48       137        60
OIR    2025130    131400  -10.2500 -136.2600      42.5        49       136        60
OIR    2025130    131400  -10.2500 -136.2700      42.8        49       135        60
OIR    2025130    131400  -10.2500 -136.2800      43.2        49       135        60
OIR    2025130    131400  -10.2500 -136.2900      43.5        49       135        60
OIR    2025130    131400  -10.2500 -136.3000      43.9        49       139        60
OIR    2025130    131400  -10.2500 -136.3100      44.3        48       141        60
OIR    2025130    131400  -10.2500 -136.3200      44.5        48       139        60
OIR    2025130    131400  -10.2500 -136.3300      44.6        48       139        60
OIR    2025130    131400  -10.2500 -136.3400      44.7        48       147        60
OIR    2025130    131400  -10.2500 -136.3600      44.0        48       147        60
OIR    2025130    131400  -10.2500 -136.3700      43.1        49       146        60
OIR    2025130    131400  -10.2500 -136.3800      42.2        49       145        60
OIR    2025130    131400  -10.2500 -136.3900      41.6        49       143        60
OIR    2025130    131400  -10.2500 -136.4000      40.7        49       140        60
OIR    2025130    131400  -10.2500 -136.4100      39.3        48       140        60
OIR    2025130    131400  -10.2500 -136.4200      38.2        47       139        60
OIR    2025130    131400  -10.2500 -136.4300      38.1        47       138        60
OIR    2025130    131400  -10.2500 -136.4400      38.1        46       136        60
OIR    2025130    131400  -10.2500 -136.4500      38.1        46       133        60
OIR    2025130    131400  -10.2500 -136.4600      38.1        46       130        60
OIR    2025130    131400  -10.2500 -136.4700      38.2        46       126        60
OIR    2025130    131400  -10.2500 -136.4800      38.3        46       125        60
OIR    2025130    131400  -10.2500 -136.4900      38.3        46       126        60
OIR    2025130    131400  -10.2500 -136.5000      38.3        46       129        60
OIR    2025130    131400  -10.2500 -136.5100      38.3        46       131        60
OIR    2025130    131400  -10.2500 -136.5200      38.4        46       131        60
OIR    2025130    131400  -10.2500 -136.5300      38.4        46       130        60
OIR    2025130    131400  -10.2500 -136.5400      38.4        46       128        60
OIR    2025130    131400  -10.2500 -136.5500      38.4        46       126        60
OIR    2025130    131400  -10.2500 -136.5600      38.4        46       129        60
OIR    2025130    131400  -10.2500 -136.5700      38.4        46       130        60
OIR    2025130    131400  -10.2500 -136.5800      38.4        46       130        60
OIR    2025130    131400  -10.2500 -136.5900      38.5        46       129        60
OIR    2025130    131400  -10.2500 -136.6000      38.5        46       127        60
OIR    2025130    131400  -10.2500 -136.6100      38.5        46       126        60
OIR    2025130    131400  -10.2500 -136.6200      38.4        46       126        60
OIR    2025130    131400  -10.2500 -136.6300      38.4        46       126        60
OIR    2025130    131400  -10.2500 -136.6400      38.4        46       126        60
OIR    2025130    131400  -10.2500 -136.6500      38.4        46       125        60
OIR    2025130    131400  -10.2500 -136.6600      38.4        46       125        60
OIR    2025130    131400  -10.2500 -136.6700      38.4        46       125        60
OIR    2025130    131400  -10.2500 -136.6800      38.4        46       125        60
OIR    2025130    131400  -10.2500 -136.6900      38.3        46       125        60
OIR    2025130    131400  -10.2500 -136.7000      38.3        46       124        60
OIR    2025130    131400  -10.2500 -136.7100      38.2        46       124        60
OIR    2025130    131400  -10.2500 -136.7200      38.1        45       121        60
OIR    2025130    131400  -10.2500 -136.7300      38.1        45       117        60
OIR    2025130    131400  -10.2500 -136.7400      38.1        44       120        60
OIR    2025130    131400  -10.2500 -136.7500      38.2        43       122        60
OIR    2025130    131400  -10.2500 -136.7600      38.1        42       123        60
OIR    2025130    131400  -10.2500 -136.7700      38.1        42       123        60
OIR    2025130    131400  -10.2500 -136.7800      38.0        41       123        60
OIR    2025130    131400  -10.2500 -136.7900      38.0        40       123        60
OIR    2025130    131400  -10.2500 -136.8000      37.8        40       124        60
OIR    2025130    131400  -10.2500 -136.8100      37.6        40       124        60
OIR    2025130    131400  -10.2500 -136.8200      37.6        39       124        60
OIR    2025130    131400  -10.2500 -136.8300      37.6        39       123        60
OIR    2025130    131400  -10.2500 -136.8400      37.8        37       120        60
OIR    2025130    131400  -10.2500 -136.8500      37.7        36       122        60
OIR    2025130    131400  -10.2500 -136.8600      37.7        35       125        60
OIR    2025130    131400  -10.2500 -136.8700      37.8        34       130        60
OIR    2025130    131400  -10.2500 -136.8800      38.0        32       134        60
OIR    2025130    131400  -10.2500 -136.8900      37.8        31       135        60
OIR    2025130    131400  -10.2500 -136.9000      37.3        30       137        60
OIR    2025130    131400  -10.2500 -136.9100      34.8        28       143        60
OIR    2025130    131400  -10.2500 -136.9200      33.7        28       144        60
OIR    2025130    131400  -10.2500 -136.9300      33.1        29       138        60
OIR    2025130    131400  -10.2500 -136.9400      32.5        30       134        60
OIR    2025130    131400  -10.2500 -136.9500      32.1        31       131        60
OIR    2025130    131400  -10.2500 -136.9600      32.0        31       130        60
OIR    2025130    131400  -10.2500 -136.9700      32.0        31       130        60
OIR    2025130    131400  -10.2500 -136.9800      32.0        31       128        60
OIR    2025130    131400  -10.2500 -136.9900      32.0        30       124        60
OIR    2025130    131400  -10.2500 -137.0000      32.5        30       119        60
OIR    2025130    131400  -10.2500 -137.0100      33.2        29       115        60
OIR    2025130    131400  -10.2500 -137.0200      34.1        28       113        60
OIR    2025130    131400  -10.2500 -137.0300      33.9        28       112        60
OIR    2025130    131400  -10.2500 -137.0400      33.9        28       113        60
OIR    2025130    131400  -10.2500 -137.0500      34.0        27       112        60
OIR    2025130    131400  -10.2500 -137.0600      33.9        27       110        60
OIR    2025130    131400  -10.2500 -137.0700      33.7        28       112        60
OIR    2025130    131400  -10.2500 -137.0800      33.7        27       116        60
OIR    2025130    131400  -10.2500 -137.0900      33.3        27       116        60
OIR    2025130    131400  -10.2500 -137.1000      32.8        27       115        60
OIR    2025130    131400  -10.2500 -137.1100      32.4        27       111        60
OIR    2025130    131400  -10.2500 -137.1200      31.9        29       108        60
OIR    2025130    131400  -10.2500 -137.1300      32.2        31       113        60
OIR    2025130    131400  -10.2500 -137.1400      33.3        33       116        60
OIR    2025130    131400  -10.2500 -137.1500      34.5        34       119        60
OIR    2025130    131400  -10.2500 -137.1600      35.6        33       122        60
OIR    2025130    131400  -10.2500 -137.1700      36.8        27       124        60
OIR    2025130    131400  -10.2500 -137.1800      37.3        24       123        60
OIR    2025130    131400  -10.2500 -137.1900      37.3        23       119        60
OIR    2025130    131400  -10.2500 -137.2000      36.8        22       116        60
OIR    2025130    131400  -10.2500 -137.2100      36.9        21       115        60
OIR    2025130    131400  -10.2500 -137.2200      37.4        20       115        60
OIR    2025130    131400  -10.2500 -137.2300      37.7        19       115        60
OIR    2025130    131400  -10.2500 -137.2400      37.8        19       115        60
OIR    2025130    131400  -10.2500 -137.2500      37.7        19       113        60
OIR    2025130    131400  -10.2500 -137.2600      37.3        19       110        60
OIR    2025130    131400  -10.2500 -137.2700      36.8        19       108        60
OIR    2025130    131400  -10.2500 -137.2800      36.4        18       108        60
OIR    2025130    131400  -10.2500 -137.2900      36.1        18       108        60
OIR    2025130    131400  -10.2500 -137.3000      36.0        18       109        60
OIR    2025130    131400  -10.2500 -137.3100      35.8        18       107        60
OIR    2025130    131400  -10.2500 -137.3200      35.3        17       105        60
OIR    2025130    131400  -10.2500 -137.3300      34.9        16       105        60
OIR    2025130    131400  -10.2500 -137.3400      34.6        15       104        60
OIR    2025130    131400  -10.2500 -137.3500      34.1        14       104        60
OIR    2025130    131400  -10.2500 -137.3600      33.9        13       104        60
OIR    2025130    131400  -10.2500 -137.3700      33.8        13       104        60
OIR    2025130    131400  -10.2500 -137.3800      33.8        12       104        60
OIR    2025130    131400  -10.2500 -137.3900      33.7        12       104        60
OIR    2025130    131400  -10.2500 -137.4000      33.6        12       104        60
OIR    2025130    131400  -10.2500 -137.4100      33.4        11       107        60
OIR    2025130    131400  -10.2500 -137.4200      33.2        11       104        60
OIR    2025130    131400  -10.2500 -137.4300      32.8        10       104        60
OIR    2025130    131400  -10.2500 -137.4400      32.3        10       104        60
OIR    2025130    131400  -10.2500 -137.4500      31.8         9       104        60
OIR    2025130    131400  -10.2500 -137.4600      31.3         9       107        60
OIR    2025130    131400  -10.2500 -137.4700      31.0         8       109        60
OIR    2025130    131400  -10.2500 -137.4800      30.8         7       111        60
OIR    2025130    131400  -10.2500 -137.4900      30.6         6       110        60
OIR    2025130    131400  -10.2500 -137.5000      30.5         6       105        60
OIR    2025130    131400  -10.2500 -137.5100      30.5         6       104        60
OIR    2025130    131400  -10.2500 -137.5200      30.4         6       103        60
OIR    2025130    131400  -10.2500 -137.5300      30.4         6       103        60
OIR    2025130    131400  -10.2500 -137.5400      30.3         6       103        60
OIR    2025130    131400  -10.2500 -137.5500      30.3         6       103        60
OIR    2025130    131400  -10.2500 -137.5600      30.3         6       104        60
OIR    2025130    131400  -10.2500 -137.5700      30.3         6       107        60
OIR    2025130    131400  -10.2500 -137.5800      30.3         6       109        60
OIR    2025130    131400  -10.2500 -137.5900      30.3         5       112        60
OIR    2025130    131400  -10.2500 -137.6000      30.3         5       115        60
OIR    2025130    131400  -10.2500 -137.6100      30.3         5       116        60
OIR    2025130    131400  -10.2500 -137.6200      30.3         5       116        60
OIR    2025130    131400  -10.2500 -137.6300      30.3         5       115        60
OIR    2025130    131400  -10.2500 -137.6400      30.3         5       115        60
OIR    2025130    131400  -10.2500 -137.6500      30.3         5       115        60
OIR    2025130    131400  -10.2500 -137.6600      30.3         5       114        60
OIR    2025130    131400  -10.2500 -137.6700      30.2         5       114        60
OIR    2025130    131400  -10.2500 -137.6800      30.2         5       112        60
OIR    2025130    131400  -10.2500 -137.6900      30.2         5       111        60
OIR    2025130    131400  -10.2500 -137.7000      30.2         4       111        60
OIR    2025130    131400  -10.2500 -137.7100      30.0         4       111        60
OIR    2025130    131400  -10.2500 -137.7200      29.7         3       113        60
OIR    2025130    131400  -10.2500 -137.7300      29.0         2       115        60
OIR    2025130    131400  -10.2500 -137.7400      28.6         0       116        60
OIR    2025130    131400  -10.2500 -137.7500      28.3       359       119        60
OIR    2025130    131400  -10.2500 -137.7600      28.2       358       121        60
OIR    2025130    131400  -10.2500 -137.7700      28.0       357       121        60
OIR    2025130    131400  -10.2500 -137.7800      27.9       357       121        60
OIR    2025130    131400  -10.2500 -137.7900      27.8       356       122        60
OIR    2025130    131400  -10.2500 -137.8000      27.7       356       122        60
OIR    2025130    131400  -10.2500 -137.8100      27.5       355       122        60
OIR    2025130    131400  -10.2500 -137.8200      27.3       355       122        60
OIR    2025130    131400  -10.2500 -137.8300      27.2       355       122        60
OIR    2025130    131400  -10.2500 -137.8400      27.0       354       122        60
OIR    2025130    131400  -10.2500 -137.8500      26.9       354       121        60
OIR    2025130    131400  -10.2500 -137.8600      26.7       354       121        60
OIR    2025130    131400  -10.2500 -137.8700      26.5       353       122        60
OIR    2025130    131400  -10.2500 -137.8800      26.3       353       122        60
OIR    2025130    131400  -10.2500 -137.8900      26.2       353       123        60
OIR    2025130    131400  -10.2500 -137.9000      26.0       352       124        60
OIR    2025130    131400  -10.2500 -137.9100      25.8       352       126        60
OIR    2025130    131400  -10.2500 -137.9200      25.6       351       129        60
OIR    2025130    131400  -10.2500 -137.9300      25.5       350       131        60
OIR    2025130    131400  -10.2500 -137.9400      25.4       350       133        60
OIR    2025130    131400  -10.2500 -137.9500      25.4       349       135        60
OIR    2025130    131400  -10.2500 -137.9600      25.4       348       139        60
OIR    2025130    131400  -10.2500 -137.9700      25.5       348       139        60
OIR    2025130    131400  -10.2500 -137.9800      25.7       347       139        60
OIR    2025130    131400  -10.2500 -137.9900      26.0       346       141        60
OIR    2025130    131400  -10.2500 -138.0000      26.3       345       142        60
OIR    2025130    131400  -10.2500 -138.0100      26.5       345       142        60
OIR    2025130    131400  -10.2500 -138.0200      26.9       344       142        60
OIR    2025130    131400  -10.2500 -138.0300      27.2       344       143        60
OIR    2025130    131400  -10.2500 -138.0400      27.5       343       142        60
OIR    2025130    131400  -10.2500 -138.0500      27.7       343       140        60
OIR    2025130    131400  -10.2500 -138.0600      27.7       343       139        60
OIR    2025130    131400  -10.2500 -138.0700      27.8       343       138        60
OIR    2025130    131400  -10.2500 -138.0800      27.8       342       139        60
OIR    2025130    131400  -10.2500 -138.0900      27.9       342       139        60
OIR    2025130    131400  -10.2500 -138.1000      27.9       342       137        60
OIR    2025130    131400  -10.2500 -138.1100      27.9       342       135        60
OIR    2025130    131400  -10.2500 -138.1200      28.0       342       137        60
OIR    2025130    131400  -10.2500 -138.1300      28.0       342       138        60
OIR    2025130    131400  -10.2500 -138.1400      28.0       342       138        60
OIR    2025130    131400  -10.2500 -138.1500      28.0       342       138        60
OIR    2025130    131400  -10.2500 -138.1600      28.1       342       138        60
OIR    2025130    131400  -10.2500 -138.1700      28.1       342       135        60
OIR    2025130    131400  -10.2500 -138.1800      28.1       342       131        60
OIR    2025130    131400  -10.2500 -138.1900      28.1       342       129        60
OIR    2025130    131400  -10.2500 -138.2000      28.1       342       126        60
OIR    2025130    131400  -10.2500 -138.2100      28.2       342       129        60
OIR    2025130    131400  -10.2500 -138.2200      28.2       342       132        60
OIR    2025130    131400  -10.2500 -138.2300      28.2       342       132        60
OIR    2025130    131400  -10.2500 -138.2400      28.3       341       131        60
OIR    2025130    131400  -10.2500 -138.2500      28.3       341       131        60
OIR    2025130    131400  -10.2500 -138.2600      28.4       341       132        60
OIR    2025130    131400  -10.2500 -138.2700      28.4       341       136        60
OIR    2025130    131400  -10.2500 -138.2800      28.5       341       139        60
OIR    2025130    131400  -10.2500 -138.2900      28.5       341       142        60
OIR    2025130    131400  -10.2500 -138.3000      28.5       340       142        60
OIR    2025130    131400  -10.2500 -138.3100      28.5       340       142        60
OIR    2025130    131400  -10.2500 -138.3200      28.5       340       141        60
OIR    2025130    131400  -10.2500 -138.3300      28.4       340       140        60
OIR    2025130    131400  -10.2500 -138.3400      28.5       340       141        60
OIR    2025130    131400  -10.2500 -138.3500      28.7       340       143        60
OIR    2025130    131400  -10.2500 -138.3600      28.8       340       145        60
OIR    2025130    131400  -10.2500 -138.3700      28.8       340       147        60
OIR    2025130    131400  -10.2600 -136.2100      39.0        50       147        60
OIR    2025130    131400  -10.2600 -136.2200      40.1        49       143        60
OIR    2025130    131400  -10.2600 -136.2300      40.5        48       139        60
OIR    2025130    131400  -10.2600 -136.2400      41.5        48       137        60
OIR    2025130    131400  -10.2600 -136.2500      42.3        47       136        60
OIR    2025130    131400  -10.2600 -136.2600      42.7        47       136        60
OIR    2025130    131400  -10.2600 -136.2700      43.1        47       135        60
OIR    2025130    131400  -10.2600 -136.2800      43.5        47       134        60
OIR    2025130    131400  -10.2600 -136.2900      43.8        47       133        60
OIR    2025130    131400  -10.2600 -136.3000      44.2        47       137        60
OIR    2025130    131400  -10.2600 -136.3100      44.5        47       140        60
OIR    2025130    131400  -10.2600 -136.3200      44.7        47       140        60
OIR    2025130    131400  -10.2600 -136.3300      44.8        47       142        60
OIR    2025130    131400  -10.2600 -136.3400      44.9        47       148        60
OIR    2025130    131400  -10.2600 -136.3700      43.8        48       148        60
OIR    2025130    131400  -10.2600 -136.3800      42.7        48       147        60
OIR    2025130    131400  -10.2600 -136.3900      42.0        48       144        60
OIR    2025130    131400  -10.2600 -136.4000      41.1        48       140        60
OIR    2025130    131400  -10.2600 -136.4100      39.5        47       141        60
OIR    2025130    131400  -10.2600 -136.4200      38.2        47       142        60
OIR    2025130    131400  -10.2600 -136.4300      38.0        46       142        60
OIR    2025130    131400  -10.2600 -136.4400      38.0        46       140        60
OIR    2025130    131400  -10.2600 -136.4500      38.1        46       136        60
OIR    2025130    131400  -10.2600 -136.4600      38.1        46       131        60
OIR    2025130    131400  -10.2600 -136.4700      38.3        46       127        60
OIR    2025130    131400  -10.2600 -136.4800      38.3        46       125        60
OIR    2025130    131400  -10.2600 -136.4900      38.3        46       127        60
OIR    2025130    131400  -10.2600 -136.5000      38.3        46       129        60
OIR    2025130    131400  -10.2600 -136.5100      38.4        46       130        60
OIR    2025130    131400  -10.2600 -136.5200      38.4        46       127        60
OIR    2025130    131400  -10.2600 -136.5300      38.4        46       124        60
OIR    2025130    131400  -10.2600 -136.5400      38.4        46       123        60
OIR    2025130    131400  -10.2600 -136.5500      38.4        46       122        60
OIR    2025130    131400  -10.2600 -136.5600      38.4        46       124        60
OIR    2025130    131400  -10.2600 -136.5700      38.5        46       125        60
OIR    2025130    131400  -10.2600 -136.5800      38.5        46       127        60
OIR    2025130    131400  -10.2600 -136.5900      38.5        46       126        60
OIR    2025130    131400  -10.2600 -136.6000      38.6        46       124        60
OIR    2025130    131400  -10.2600 -136.6100      38.6        46       122        60
OIR    2025130    131400  -10.2600 -136.6200      38.5        46       120        60
OIR    2025130    131400  -10.2600 -136.6300      38.4        46       120        60
OIR    2025130    131400  -10.2600 -136.6400      38.4        46       120        60
OIR    2025130    131400  -10.2600 -136.6500      38.4        46       122        60
OIR    2025130    131400  -10.2600 -136.6600      38.4        46       123        60
OIR    2025130    131400  -10.2600 -136.6700      38.4        46       124        60
OIR    2025130    131400  -10.2600 -136.6800      38.4        46       125        60
OIR    2025130    131400  -10.2600 -136.6900      38.4        46       125        60
OIR    2025130    131400  -10.2600 -136.7000      38.4        45       124        60
OIR    2025130    131400  -10.2600 -136.7100      38.3        45       121        60
OIR    2025130    131400  -10.2600 -136.7200      38.4        44       119        60
OIR    2025130    131400  -10.2600 -136.7300      38.3        43       116        60
OIR    2025130    131400  -10.2600 -136.7400      38.6        42       117        60
OIR    2025130    131400  -10.2600 -136.7500      38.6        42       119        60
OIR    2025130    131400  -10.2600 -136.7600      38.6        41       122        60
OIR    2025130    131400  -10.2600 -136.7700      38.7        41       123        60
OIR    2025130    131400  -10.2600 -136.7800      38.6        40       123        60
OIR    2025130    131400  -10.2600 -136.7900      38.5        40       122        60
OIR    2025130    131400  -10.2600 -136.8000      38.5        40       122        60
OIR    2025130    131400  -10.2600 -136.8100      38.2        39       122        60
OIR    2025130    131400  -10.2600 -136.8200      38.2        39       123        60
OIR    2025130    131400  -10.2600 -136.8300      38.4        38       121        60
OIR    2025130    131400  -10.2600 -136.8400      39.1        36       116        60
OIR    2025130    131400  -10.2600 -136.8500      39.6        34       117        60
OIR    2025130    131400  -10.2600 -136.8600      40.1        32       120        60
OIR    2025130    131400  -10.2600 -136.8700      39.9        32       129        60
OIR    2025130    131400  -10.2600 -136.8800      39.4        31       136        60
OIR    2025130    131400  -10.2600 -136.8900      39.0        31       138        60
OIR    2025130    131400  -10.2600 -136.9000      38.7        30       141        60
OIR    2025130    131400  -10.2600 -136.9100      36.8        28       143        60
OIR    2025130    131400  -10.2600 -136.9200      36.4        28       144        60
OIR    2025130    131400  -10.2600 -136.9300      36.5        28       143        60
OIR    2025130    131400  -10.2600 -136.9400      35.6        28       140        60
OIR    2025130    131400  -10.2600 -136.9500      35.5        27       137        60
OIR    2025130    131400  -10.2600 -136.9600      35.4        27       135        60
OIR    2025130    131400  -10.2600 -136.9700      34.8        26       135        60
OIR    2025130    131400  -10.2600 -136.9800      35.6        25       131        60
OIR    2025130    131400  -10.2600 -136.9900      36.1        24       128        60
OIR    2025130    131400  -10.2600 -137.0000      36.8        23       125        60
OIR    2025130    131400  -10.2600 -137.0100      37.7        22       123        60
OIR    2025130    131400  -10.2600 -137.0200      37.2        23       117        60
OIR    2025130    131400  -10.2600 -137.0300      36.2        24       114        60
OIR    2025130    131400  -10.2600 -137.0400      35.9        24       112        60
OIR    2025130    131400  -10.2600 -137.0500      36.0        24       110        60
OIR    2025130    131400  -10.2600 -137.0600      36.4        24       108        60
OIR    2025130    131400  -10.2600 -137.0700      37.0        23       109        60
OIR    2025130    131400  -10.2600 -137.0800      36.6        24       112        60
OIR    2025130    131400  -10.2600 -137.0900      35.4        24       115        60
OIR    2025130    131400  -10.2600 -137.1000      33.9        24       115        60
OIR    2025130    131400  -10.2600 -137.1100      33.1        24       111        60
OIR    2025130    131400  -10.2600 -137.1200      31.9        26       107        60
OIR    2025130    131400  -10.2600 -137.1300      32.1        29       114        60
OIR    2025130    131400  -10.2600 -137.1400      33.0        31       119        60
OIR    2025130    131400  -10.2600 -137.1500      34.5        30       123        60
OIR    2025130    131400  -10.2600 -137.1600      36.3        27       123        60
OIR    2025130    131400  -10.2600 -137.1700      37.2        23       122        60
OIR    2025130    131400  -10.2600 -137.1800      37.5        22       121        60
OIR    2025130    131400  -10.2600 -137.1900      37.7        21       120        60
OIR    2025130    131400  -10.2600 -137.2000      37.8        19       116        60
OIR    2025130    131400  -10.2600 -137.2100      37.9        18       114        60
OIR    2025130    131400  -10.2600 -137.2200      38.0        18       113        60
OIR    2025130    131400  -10.2600 -137.2300      38.0        18       111        60
OIR    2025130    131400  -10.2600 -137.2400      38.0        18       113        60
OIR    2025130    131400  -10.2600 -137.2500      37.9        18       113        60
OIR    2025130    131400  -10.2600 -137.2600      37.7        18       113        60
OIR    2025130    131400  -10.2600 -137.2700      37.5        18       112        60
OIR    2025130    131400  -10.2600 -137.2800      37.3        18       111        60
OIR    2025130    131400  -10.2600 -137.2900      37.1        18       111        60
OIR    2025130    131400  -10.2600 -137.3000      36.9        18       111        60
OIR    2025130    131400  -10.2600 -137.3100      36.7        17       110        60
OIR    2025130    131400  -10.2600 -137.3200      36.2        16       109        60
OIR    2025130    131400  -10.2600 -137.3300      35.7        15       107        60
OIR    2025130    131400  -10.2600 -137.3400      35.2        14       105        60
OIR    2025130    131400  -10.2600 -137.3500      34.3        13       105        60
OIR    2025130    131400  -10.2600 -137.3600      33.9        12       105        60
OIR    2025130    131400  -10.2600 -137.3700      33.8        12       108        60
OIR    2025130    131400  -10.2600 -137.3800      33.7        12       107        60
OIR    2025130    131400  -10.2600 -137.3900      33.6        12       104        60
OIR    2025130    131400  -10.2600 -137.4000      33.6        11       105        60
OIR    2025130    131400  -10.2600 -137.4100      33.5        11       108        60
OIR    2025130    131400  -10.2600 -137.4200      33.3        10       105        60
OIR    2025130    131400  -10.2600 -137.4300      33.0        10       104        60
OIR    2025130    131400  -10.2600 -137.4400      32.6         9       107        60
OIR    2025130    131400  -10.2600 -137.4500      32.2         9       109        60
OIR    2025130    131400  -10.2600 -137.4600      31.7         8       110        60
OIR    2025130    131400  -10.2600 -137.4700      31.3         8       111        60
OIR    2025130    131400  -10.2600 -137.4800      31.1         7       113        60
OIR    2025130    131400  -10.2600 -137.4900      30.7         6       111        60
OIR    2025130    131400  -10.2600 -137.5000      30.6         6       107        60
OIR    2025130    131400  -10.2600 -137.5100      30.5         6       104        60
OIR    2025130    131400  -10.2600 -137.5200      30.5         6       103        60
OIR    2025130    131400  -10.2600 -137.5300      30.5         6       103        60
OIR    2025130    131400  -10.2600 -137.5400      30.4         6       103        60
OIR    2025130    131400  -10.2600 -137.5500      30.3         6       104        60
OIR    2025130    131400  -10.2600 -137.5600      30.3         6       105        60
OIR    2025130    131400  -10.2600 -137.5700      30.3         6       107        60
OIR    2025130    131400  -10.2600 -137.5800      30.3         6       110        60
OIR    2025130    131400  -10.2600 -137.5900      30.3         5       113        60
OIR    2025130    131400  -10.2600 -137.6000      30.3         5       115        60
OIR    2025130    131400  -10.2600 -137.6100      30.3         5       115        60
OIR    2025130    131400  -10.2600 -137.6200      30.3         5       115        60
OIR    2025130    131400  -10.2600 -137.6300      30.3         5       114        60
OIR    2025130    131400  -10.2600 -137.6400      30.3         5       114        60
OIR    2025130    131400  -10.2600 -137.6500      30.3         5       114        60
OIR    2025130    131400  -10.2600 -137.6600      30.3         5       113        60
OIR    2025130    131400  -10.2600 -137.6700      30.2         5       112        60
OIR    2025130    131400  -10.2600 -137.6800      30.2         5       111        60
OIR    2025130    131400  -10.2600 -137.6900      30.2         5       111        60
OIR    2025130    131400  -10.2600 -137.7000      30.2         4       110        60
OIR    2025130    131400  -10.2600 -137.7100      30.0         4       111        60
OIR    2025130    131400  -10.2600 -137.7200      29.6         3       115        60
OIR    2025130    131400  -10.2600 -137.7300      28.9         2       116        60
OIR    2025130    131400  -10.2600 -137.7400      28.6         0       119        60
OIR    2025130    131400  -10.2600 -137.7500      28.3       359       121        60
OIR    2025130    131400  -10.2600 -137.7600      28.1       359       122        60
OIR    2025130    131400  -10.2600 -137.7700      27.9       358       122        60
OIR    2025130    131400  -10.2600 -137.7800      27.7       357       123        60
OIR    2025130    131400  -10.2600 -137.7900      27.5       356       124        60
OIR    2025130    131400  -10.2600 -137.8000      27.4       356       124        60
OIR    2025130    131400  -10.2600 -137.8100      27.2       355       124        60
OIR    2025130    131400  -10.2600 -137.8200      27.0       355       124        60
OIR    2025130    131400  -10.2600 -137.8300      26.8       355       124        60
OIR    2025130    131400  -10.2600 -137.8400      26.6       354       123        60
OIR    2025130    131400  -10.2600 -137.8500      26.3       354       122        60
OIR    2025130    131400  -10.2600 -137.8600      26.1       354       123        60
OIR    2025130    131400  -10.2600 -137.8700      25.9       354       123        60
OIR    2025130    131400  -10.2600 -137.8800      25.6       353       123        60
OIR    2025130    131400  -10.2600 -137.8900      25.4       353       124        60
OIR    2025130    131400  -10.2600 -137.9000      25.2       353       125        60
OIR    2025130    131400  -10.2600 -137.9100      25.1       352       127        60
OIR    2025130    131400  -10.2600 -137.9200      25.0       351       129        60
OIR    2025130    131400  -10.2600 -137.9300      25.0       351       131        60
OIR    2025130    131400  -10.2600 -137.9400      25.1       350       133        60
OIR    2025130    131400  -10.2600 -137.9500      25.1       349       135        60
OIR    2025130    131400  -10.2600 -137.9600      25.2       349       138        60
OIR    2025130    131400  -10.2600 -137.9700      25.4       348       139        60
OIR    2025130    131400  -10.2600 -137.9800      25.6       347       140        60
OIR    2025130    131400  -10.2600 -137.9900      25.9       346       143        60
OIR    2025130    131400  -10.2600 -138.0000      26.1       346       145        60
OIR    2025130    131400  -10.2600 -138.0100      26.5       345       145        60
OIR    2025130    131400  -10.2600 -138.0200      26.8       344       145        60
OIR    2025130    131400  -10.2600 -138.0300      27.1       344       145        60
OIR    2025130    131400  -10.2600 -138.0400      27.4       344       144        60
OIR    2025130    131400  -10.2600 -138.0500      27.5       343       143        60
OIR    2025130    131400  -10.2600 -138.0600      27.6       343       141        60
OIR    2025130    131400  -10.2600 -138.0700      27.7       343       140        60
OIR    2025130    131400  -10.2600 -138.0800      27.8       343       139        60
OIR    2025130    131400  -10.2600 -138.0900      27.8       342       139        60
OIR    2025130    131400  -10.2600 -138.1000      27.9       342       137        60
OIR    2025130    131400  -10.2600 -138.1100      27.9       342       136        60
OIR    2025130    131400  -10.2600 -138.1200      28.0       342       136        60
OIR    2025130    131400  -10.2600 -138.1300      28.0       342       136        60
OIR    2025130    131400  -10.2600 -138.1400      28.0       342       137        60
OIR    2025130    131400  -10.2600 -138.1500      28.0       342       137        60
OIR    2025130    131400  -10.2600 -138.1600      28.1       342       136        60
OIR    2025130    131400  -10.2600 -138.1700      28.1       342       133        60
OIR    2025130    131400  -10.2600 -138.1800      28.1       342       130        60
OIR    2025130    131400  -10.2600 -138.1900      28.1       342       128        60
OIR    2025130    131400  -10.2600 -138.2000      28.1       342       126        60
OIR    2025130    131400  -10.2600 -138.2100      28.2       342       129        60
OIR    2025130    131400  -10.2600 -138.2200      28.2       342       132        60
OIR    2025130    131400  -10.2600 -138.2300      28.2       342       133        60
OIR    2025130    131400  -10.2600 -138.2400      28.3       342       132        60
OIR    2025130    131400  -10.2600 -138.2500      28.4       341       130        60
OIR    2025130    131400  -10.2600 -138.2600      28.4       341       130        60
OIR    2025130    131400  -10.2600 -138.2700      28.5       341       133        60
OIR    2025130    131400  -10.2600 -138.2800      28.5       341       137        60
OIR    2025130    131400  -10.2600 -138.2900      28.6       341       140        60
OIR    2025130    131400  -10.2600 -138.3000      28.7       341       140        60
OIR    2025130    131400  -10.2600 -138.3100      28.7       341       141        60
OIR    2025130    131400  -10.2600 -138.3200      28.7       340       140        60
OIR    2025130    131400  -10.2600 -138.3300      28.7       340       140        60
OIR    2025130    131400  -10.2600 -138.3400      28.7       340       143        60
OIR    2025130    131400  -10.2600 -138.3500      28.8       340       146        60
OIR    2025130    131400  -10.2600 -138.3600      28.9       340       148        60
OIR    2025130    131400  -10.2700 -136.2200      39.3        48       145        60
OIR    2025130    131400  -10.2700 -136.2300      40.1        47       141        60
OIR    2025130    131400  -10.2700 -136.2400      41.2        47       138        60
OIR    2025130    131400  -10.2700 -136.2500      42.3        47       137        60
OIR    2025130    131400  -10.2700 -136.2600      42.7        47       136        60
OIR    2025130    131400  -10.2700 -136.2700      43.2        47       135        60
OIR    2025130    131400  -10.2700 -136.2800      43.7        47       134        60
OIR    2025130    131400  -10.2700 -136.2900      44.0        47       132        60
OIR    2025130    131400  -10.2700 -136.3000      44.3        47       136        60
OIR    2025130    131400  -10.2700 -136.3100      44.6        47       139        60
OIR    2025130    131400  -10.2700 -136.3200      44.8        47       141        60
OIR    2025130    131400  -10.2700 -136.3300      44.9        46       143        60
OIR    2025130    131400  -10.2700 -136.3400      44.9        46       149        60
OIR    2025130    131400  -10.2700 -136.3800      43.3        47       147        60
OIR    2025130    131400  -10.2700 -136.3900      42.6        47       144        60
OIR    2025130    131400  -10.2700 -136.4000      41.9        47       140        60
OIR    2025130    131400  -10.2700 -136.4100      40.5        47       143        60
OIR    2025130    131400  -10.2700 -136.4200      38.4        47       145        60
OIR    2025130    131400  -10.2700 -136.4300      38.0        46       145        60
OIR    2025130    131400  -10.2700 -136.4400      38.0        46       144        60
OIR    2025130    131400  -10.2700 -136.4500      38.1        46       140        60
OIR    2025130    131400  -10.2700 -136.4600      38.1        46       135        60
OIR    2025130    131400  -10.2700 -136.4700      38.3        46       129        60
OIR    2025130    131400  -10.2700 -136.4800      38.4        46       127        60
OIR    2025130    131400  -10.2700 -136.4900      38.4        46       129        60
OIR    2025130    131400  -10.2700 -136.5000      38.4        46       130        60
OIR    2025130    131400  -10.2700 -136.5100      38.4        46       129        60
OIR    2025130    131400  -10.2700 -136.5200      38.4        46       126        60
OIR    2025130    131400  -10.2700 -136.5300      38.5        46       124        60
OIR    2025130    131400  -10.2700 -136.5400      38.5        46       123        60
OIR    2025130    131400  -10.2700 -136.5500      38.5        46       122        60
OIR    2025130    131400  -10.2700 -136.5600      38.5        46       123        60
OIR    2025130    131400  -10.2700 -136.5700      38.6        45       123        60
OIR    2025130    131400  -10.2700 -136.5800      38.7        45       124        60
OIR    2025130    131400  -10.2700 -136.5900      38.8        45       124        60
OIR    2025130    131400  -10.2700 -136.6000      38.9        45       122        60
OIR    2025130    131400  -10.2700 -136.6100      38.9        45       120        60
OIR    2025130    131400  -10.2700 -136.6200      38.9        45       117        60
OIR    2025130    131400  -10.2700 -136.6300      38.8        45       119        60
OIR    2025130    131400  -10.2700 -136.6400      38.5        46       120        60
OIR    2025130    131400  -10.2700 -136.6500      38.6        45       123        60
OIR    2025130    131400  -10.2700 -136.6600      38.8        44       125        60
OIR    2025130    131400  -10.2700 -136.6700      39.2        43       127        60
OIR    2025130    131400  -10.2700 -136.6800      39.5        41       128        60
OIR    2025130    131400  -10.2700 -136.6900      39.8        41       127        60
OIR    2025130    131400  -10.2700 -136.7000      39.9        40       126        60
OIR    2025130    131400  -10.2700 -136.7100      39.9        40       124        60
OIR    2025130    131400  -10.2700 -136.7200      39.7        40       122        60
OIR    2025130    131400  -10.2700 -136.7300      39.4        40       120        60
OIR    2025130    131400  -10.2700 -136.7400      39.2        40       120        60
OIR    2025130    131400  -10.2700 -136.7500      39.1        40       120        60
OIR    2025130    131400  -10.2700 -136.7600      39.0        40       122        60
OIR    2025130    131400  -10.2700 -136.7700      38.9        40       123        60
OIR    2025130    131400  -10.2700 -136.7800      38.9        40       123        60
OIR    2025130    131400  -10.2700 -136.7900      38.8        40       122        60
OIR    2025130    131400  -10.2700 -136.8000      38.9        39       122        60
OIR    2025130    131400  -10.2700 -136.8100      39.0        39       123        60
OIR    2025130    131400  -10.2700 -136.8200      39.1        39       125        60
OIR    2025130    131400  -10.2700 -136.8300      39.7        37       122        60
OIR    2025130    131400  -10.2700 -136.8400      40.3        34       117        60
OIR    2025130    131400  -10.2700 -136.8500      40.6        32       121        60
OIR    2025130    131400  -10.2700 -136.8600      40.8        32       123        60
OIR    2025130    131400  -10.2700 -136.8700      40.9        31       131        60
OIR    2025130    131400  -10.2700 -136.8800      40.5        31       138        60
OIR    2025130    131400  -10.2700 -136.8900      40.3        30       141        60
OIR    2025130    131400  -10.2700 -136.9000      40.0        30       144        60
OIR    2025130    131400  -10.2700 -136.9100      38.2        28       146        60
OIR    2025130    131400  -10.2700 -136.9200      37.6        28       146        60
OIR    2025130    131400  -10.2700 -136.9300      37.3        28       147        60
OIR    2025130    131400  -10.2700 -136.9400      36.9        27       144        60
OIR    2025130    131400  -10.2700 -136.9500      36.8        26       140        60
OIR    2025130    131400  -10.2700 -136.9600      36.8        25       138        60
OIR    2025130    131400  -10.2700 -136.9700      37.1        23       137        60
OIR    2025130    131400  -10.2700 -136.9800      37.6        23       132        60
OIR    2025130    131400  -10.2700 -136.9900      37.6        22       127        60
OIR    2025130    131400  -10.2700 -137.0000      37.9        22       126        60
OIR    2025130    131400  -10.2700 -137.0100      38.0        22       124        60
OIR    2025130    131400  -10.2700 -137.0200      38.0        22       117        60
OIR    2025130    131400  -10.2700 -137.0300      37.7        22       114        60
OIR    2025130    131400  -10.2700 -137.0400      37.5        22       112        60
OIR    2025130    131400  -10.2700 -137.0500      37.0        23       110        60
OIR    2025130    131400  -10.2700 -137.0600      37.0        23       108        60
OIR    2025130    131400  -10.2700 -137.0700      37.3        23       109        60
OIR    2025130    131400  -10.2700 -137.0800      37.3        22       111        60
OIR    2025130    131400  -10.2700 -137.0900      37.1        22       112        60
OIR    2025130    131400  -10.2700 -137.1000      35.8        21       112        60
OIR    2025130    131400  -10.2700 -137.1100      35.1        21       108        60
OIR    2025130    131400  -10.2700 -137.1200      34.4        22       105        60
OIR    2025130    131400  -10.2700 -137.1300      34.4        24       114        60
OIR    2025130    131400  -10.2700 -137.1400      35.3        26       120        60
OIR    2025130    131400  -10.2700 -137.1500      37.1        25       123        60
OIR    2025130    131400  -10.2700 -137.1600      37.7        24       124        60
OIR    2025130    131400  -10.2700 -137.1700      37.5        21       125        60
OIR    2025130    131400  -10.2700 -137.1800      37.6        21       125        60
OIR    2025130    131400  -10.2700 -137.1900      37.9        19       125        60
OIR    2025130    131400  -10.2700 -137.2000      38.0        18       120        60
OIR    2025130    131400  -10.2700 -137.2100      38.1        18       115        60
OIR    2025130    131400  -10.2700 -137.2200      38.0        18       112        60
OIR    2025130    131400  -10.2700 -137.2300      38.0        18       110        60
OIR    2025130    131400  -10.2700 -137.2400      38.0        18       111        60
OIR    2025130    131400  -10.2700 -137.2500      37.9        18       112        60
OIR    2025130    131400  -10.2700 -137.2600      37.8        18       113        60
OIR    2025130    131400  -10.2700 -137.2700      37.7        18       113        60
OIR    2025130    131400  -10.2700 -137.2800      37.6        18       113        60
OIR    2025130    131400  -10.2700 -137.2900      37.5        18       114        60
OIR    2025130    131400  -10.2700 -137.3000      37.4        17       115        60
OIR    2025130    131400  -10.2700 -137.3100      37.3        17       114        60
OIR    2025130    131400  -10.2700 -137.3200      37.0        16       113        60
OIR    2025130    131400  -10.2700 -137.3300      36.3        15       111        60
OIR    2025130    131400  -10.2700 -137.3400      35.6        14       109        60
OIR    2025130    131400  -10.2700 -137.3500      34.5        13       108        60
OIR    2025130    131400  -10.2700 -137.3600      34.0        12       108        60
OIR    2025130    131400  -10.2700 -137.3700      33.8        12       110        60
OIR    2025130    131400  -10.2700 -137.3800      33.7        12       109        60
OIR    2025130    131400  -10.2700 -137.3900      33.6        11       107        60
OIR    2025130    131400  -10.2700 -137.4000      33.6        11       108        60
OIR    2025130    131400  -10.2700 -137.4100      33.5        11       109        60
OIR    2025130    131400  -10.2700 -137.4200      33.4        10       107        60
OIR    2025130    131400  -10.2700 -137.4300      33.1         9       107        60
OIR    2025130    131400  -10.2700 -137.4400      32.8         9       109        60
OIR    2025130    131400  -10.2700 -137.4500      32.5         8       110        60
OIR    2025130    131400  -10.2700 -137.4600      32.1         7       111        60
OIR    2025130    131400  -10.2700 -137.4700      31.8         7       112        60
OIR    2025130    131400  -10.2700 -137.4800      31.4         7       112        60
OIR    2025130    131400  -10.2700 -137.4900      30.9         6       110        60
OIR    2025130    131400  -10.2700 -137.5000      30.7         6       107        60
OIR    2025130    131400  -10.2700 -137.5100      30.6         6       104        60
OIR    2025130    131400  -10.2700 -137.5200      30.5         6       103        60
OIR    2025130    131400  -10.2700 -137.5300      30.5         6       103        60
OIR    2025130    131400  -10.2700 -137.5400      30.5         6       103        60
OIR    2025130    131400  -10.2700 -137.5500      30.4         6       104        60
OIR    2025130    131400  -10.2700 -137.5600      30.3         6       104        60
OIR    2025130    131400  -10.2700 -137.5700      30.3         6       107        60
OIR    2025130    131400  -10.2700 -137.5800      30.3         6       109        60
OIR    2025130    131400  -10.2700 -137.5900      30.3         5       112        60
OIR    2025130    131400  -10.2700 -137.6000      30.3         5       113        60
OIR    2025130    131400  -10.2700 -137.6100      30.3         5       113        60
OIR    2025130    131400  -10.2700 -137.6200      30.3         5       113        60
OIR    2025130    131400  -10.2700 -137.6300      30.3         5       112        60
OIR    2025130    131400  -10.2700 -137.6400      30.3         5       112        60
OIR    2025130    131400  -10.2700 -137.6500      30.3         5       113        60
OIR    2025130    131400  -10.2700 -137.6600      30.3         5       112        60
OIR    2025130    131400  -10.2700 -137.6700      30.3         5       111        60
OIR    2025130    131400  -10.2700 -137.6800      30.2         5       111        60
OIR    2025130    131400  -10.2700 -137.6900      30.2         4       112        60
OIR    2025130    131400  -10.2700 -137.7000      30.1         4       112        60
OIR    2025130    131400  -10.2700 -137.7100      29.9         4       113        60
OIR    2025130    131400  -10.2700 -137.7200      29.5         3       116        60
OIR    2025130    131400  -10.2700 -137.7300      28.9         1       119        60
OIR    2025130    131400  -10.2700 -137.7400      28.5         0       121        60
OIR    2025130    131400  -10.2700 -137.7500      28.3       360       122        60
OIR    2025130    131400  -10.2700 -137.7600      28.0       359       123        60
OIR    2025130    131400  -10.2700 -137.7700      27.7       358       124        60
OIR    2025130    131400  -10.2700 -137.7800      27.5       357       124        60
OIR    2025130    131400  -10.2700 -137.7900      27.2       357       125        60
OIR    2025130    131400  -10.2700 -137.8000      27.0       356       126        60
OIR    2025130    131400  -10.2700 -137.8100      26.7       356       126        60
OIR    2025130    131400  -10.2700 -137.8200      26.5       355       125        60
OIR    2025130    131400  -10.2700 -137.8300      26.3       355       124        60
OIR    2025130    131400  -10.2700 -137.8400      26.1       355       123        60
OIR    2025130    131400  -10.2700 -137.8500      25.8       354       122        60
OIR    2025130    131400  -10.2700 -137.8600      25.4       354       124        60
OIR    2025130    131400  -10.2700 -137.8700      25.0       354       126        60
OIR    2025130    131400  -10.2700 -137.8800      24.7       354       125        60
OIR    2025130    131400  -10.2700 -137.8900      24.6       353       125        60
OIR    2025130    131400  -10.2700 -137.9000      24.5       353       126        60
OIR    2025130    131400  -10.2700 -137.9100      24.5       352       128        60
OIR    2025130    131400  -10.2700 -137.9200      24.5       352       130        60
OIR    2025130    131400  -10.2700 -137.9300      24.6       351       132        60
OIR    2025130    131400  -10.2700 -137.9400      24.7       350       133        60
OIR    2025130    131400  -10.2700 -137.9500      24.9       349       136        60
OIR    2025130    131400  -10.2700 -137.9600      25.0       349       139        60
OIR    2025130    131400  -10.2700 -137.9700      25.2       348       140        60
OIR    2025130    131400  -10.2700 -137.9800      25.4       347       141        60
OIR    2025130    131400  -10.2700 -137.9900      25.7       346       143        60
OIR    2025130    131400  -10.2700 -138.0000      26.1       346       145        60
OIR    2025130    131400  -10.2700 -138.0100      26.5       345       146        60
OIR    2025130    131400  -10.2700 -138.0200      26.7       345       146        60
OIR    2025130    131400  -10.2700 -138.0300      27.0       344       146        60
OIR    2025130    131400  -10.2700 -138.0400      27.2       344       146        60
OIR    2025130    131400  -10.2700 -138.0500      27.3       344       143        60
OIR    2025130    131400  -10.2700 -138.0600      27.5       343       142        60
OIR    2025130    131400  -10.2700 -138.0700      27.6       343       140        60
OIR    2025130    131400  -10.2700 -138.0800      27.7       343       139        60
OIR    2025130    131400  -10.2700 -138.0900      27.8       343       138        60
OIR    2025130    131400  -10.2700 -138.1000      27.8       342       137        60
OIR    2025130    131400  -10.2700 -138.1100      27.9       342       137        60
OIR    2025130    131400  -10.2700 -138.1200      27.9       342       136        60
OIR    2025130    131400  -10.2700 -138.1300      28.0       342       135        60
OIR    2025130    131400  -10.2700 -138.1400      28.0       342       136        60
OIR    2025130    131400  -10.2700 -138.1500      28.0       342       136        60
OIR    2025130    131400  -10.2700 -138.1600      28.1       342       135        60
OIR    2025130    131400  -10.2700 -138.1700      28.1       342       132        60
OIR    2025130    131400  -10.2700 -138.1800      28.1       342       130        60
OIR    2025130    131400  -10.2700 -138.1900      28.1       342       128        60
OIR    2025130    131400  -10.2700 -138.2000      28.2       342       125        60
OIR    2025130    131400  -10.2700 -138.2100      28.2       342       128        60
OIR    2025130    131400  -10.2700 -138.2200      28.2       342       132        60
OIR    2025130    131400  -10.2700 -138.2300      28.3       342       133        60
OIR    2025130    131400  -10.2700 -138.2400      28.3       342       132        60
OIR    2025130    131400  -10.2700 -138.2500      28.4       341       130        60
OIR    2025130    131400  -10.2700 -138.2600      28.5       341       129        60
OIR    2025130    131400  -10.2700 -138.2700      28.5       341       131        60
OIR    2025130    131400  -10.2700 -138.2800      28.6       341       135        60
OIR    2025130    131400  -10.2700 -138.2900      28.7       341       138        60
OIR    2025130    131400  -10.2700 -138.3000      28.8       341       139        60
OIR    2025130    131400  -10.2700 -138.3100      28.8       341       140        60
OIR    2025130    131400  -10.2700 -138.3200      28.8       340       140        60
OIR    2025130    131400  -10.2700 -138.3300      28.8       340       141        60
OIR    2025130    131400  -10.2700 -138.3400      28.8       340       144        60
OIR    2025130    131400  -10.2700 -138.3500      28.9       340       147        60
OIR    2025130    131400  -10.2700 -138.3600      28.9       340       149        60
OIR    2025130    131400  -10.2800 -136.2200      38.8        48       149        60
OIR    2025130    131400  -10.2800 -136.2300      39.6        47       146        60
OIR    2025130    131400  -10.2800 -136.2400      40.8        46       143        60
OIR    2025130    131400  -10.2800 -136.2500      41.9        46       141        60
OIR    2025130    131400  -10.2800 -136.2600      42.6        46       139        60
OIR    2025130    131400  -10.2800 -136.2700      43.1        46       138        60
OIR    2025130    131400  -10.2800 -136.2800      43.7        46       136        60
OIR    2025130    131400  -10.2800 -136.2900      44.1        46       134        60
OIR    2025130    131400  -10.2800 -136.3000      44.4        46       138        60
OIR    2025130    131400  -10.2800 -136.3100      44.6        46       140        60
OIR    2025130    131400  -10.2800 -136.3200      44.7        46       141        60
OIR    2025130    131400  -10.2800 -136.3300      44.9        46       143        60
OIR    2025130    131400  -10.2800 -136.3400      45.0        46       146        60
OIR    2025130    131400  -10.2800 -136.3500      44.9        46       149        60
OIR    2025130    131400  -10.2800 -136.3700      44.6        46       149        60
OIR    2025130    131400  -10.2800 -136.3800      44.0        46       145        60
OIR    2025130    131400  -10.2800 -136.3900      43.3        46       142        60
OIR    2025130    131400  -10.2800 -136.4000      42.9        46       140        60
OIR    2025130    131400  -10.2800 -136.4100      42.2        46       143        60
OIR    2025130    131400  -10.2800 -136.4200      40.1        46       145        60
OIR    2025130    131400  -10.2800 -136.4300      38.4        46       147        60
OIR    2025130    131400  -10.2800 -136.4400      38.1        46       148        60
OIR    2025130    131400  -10.2800 -136.4500      38.3        46       148        60
OIR    2025130    131400  -10.2800 -136.4600      38.8        45       144        60
OIR    2025130    131400  -10.2800 -136.4700      39.6        44       136        60
OIR    2025130    131400  -10.2800 -136.4800      39.5        44       135        60
OIR    2025130    131400  -10.2800 -136.4900      39.1        45       136        60
OIR    2025130    131400  -10.2800 -136.5000      38.9        45       134        60
OIR    2025130    131400  -10.2800 -136.5100      38.7        45       130        60
OIR    2025130    131400  -10.2800 -136.5200      38.8        45       129        60
OIR    2025130    131400  -10.2800 -136.5300      38.9        45       128        60
OIR    2025130    131400  -10.2800 -136.5400      39.1        45       126        60
OIR    2025130    131400  -10.2800 -136.5500      39.1        45       125        60
OIR    2025130    131400  -10.2800 -136.5600      39.0        45       124        60
OIR    2025130    131400  -10.2800 -136.5700      39.0        45       124        60
OIR    2025130    131400  -10.2800 -136.5800      39.0        44       123        60
OIR    2025130    131400  -10.2800 -136.5900      39.1        44       122        60
OIR    2025130    131400  -10.2800 -136.6000      39.1        44       121        60
OIR    2025130    131400  -10.2800 -136.6100      39.2        44       120        60
OIR    2025130    131400  -10.2800 -136.6200      39.2        44       119        60
OIR    2025130    131400  -10.2800 -136.6300      39.2        44       121        60
OIR    2025130    131400  -10.2800 -136.6400      39.2        43       124        60
OIR    2025130    131400  -10.2800 -136.6500      39.4        42       128        60
OIR    2025130    131400  -10.2800 -136.6600      39.9        41       131        60
OIR    2025130    131400  -10.2800 -136.6700      40.0        40       132        60
OIR    2025130    131400  -10.2800 -136.6800      40.0        40       132        60
OIR    2025130    131400  -10.2800 -136.6900      40.0        40       130        60
OIR    2025130    131400  -10.2800 -136.7000      40.0        39       130        60
OIR    2025130    131400  -10.2800 -136.7100      40.0        39       130        60
OIR    2025130    131400  -10.2800 -136.7200      39.9        40       129        60
OIR    2025130    131400  -10.2800 -136.7300      39.7        40       127        60
OIR    2025130    131400  -10.2800 -136.7400      39.5        40       125        60
OIR    2025130    131400  -10.2800 -136.7500      39.3        40       124        60
OIR    2025130    131400  -10.2800 -136.7600      39.1        40       123        60
OIR    2025130    131400  -10.2800 -136.7700      39.1        40       123        60
OIR    2025130    131400  -10.2800 -136.7800      39.0        40       123        60
OIR    2025130    131400  -10.2800 -136.7900      39.0        40       123        60
OIR    2025130    131400  -10.2800 -136.8000      39.1        39       124        60
OIR    2025130    131400  -10.2800 -136.8100      39.4        39       126        60
OIR    2025130    131400  -10.2800 -136.8200      40.0        38       129        60
OIR    2025130    131400  -10.2800 -136.8300      40.9        36       127        60
OIR    2025130    131400  -10.2800 -136.8400      41.3        33       124        60
OIR    2025130    131400  -10.2800 -136.8500      41.3        32       127        60
OIR    2025130    131400  -10.2800 -136.8600      41.4        31       131        60
OIR    2025130    131400  -10.2800 -136.8700      41.5        31       135        60
OIR    2025130    131400  -10.2800 -136.8800      41.4        31       139        60
OIR    2025130    131400  -10.2800 -136.8900      41.3        31       144        60
OIR    2025130    131400  -10.2800 -136.9000      40.9        30       147        60
OIR    2025130    131400  -10.2800 -136.9400      37.8        27       145        60
OIR    2025130    131400  -10.2800 -136.9500      37.5        26       139        60
OIR    2025130    131400  -10.2800 -136.9600      37.5        25       138        60
OIR    2025130    131400  -10.2800 -136.9700      37.7        23       137        60
OIR    2025130    131400  -10.2800 -136.9800      37.8        23       130        60
OIR    2025130    131400  -10.2800 -136.9900      37.9        22       124        60
OIR    2025130    131400  -10.2800 -137.0000      38.0        22       122        60
OIR    2025130    131400  -10.2800 -137.0100      38.0        22       120        60
OIR    2025130    131400  -10.2800 -137.0200      38.0        22       115        60
OIR    2025130    131400  -10.2800 -137.0300      38.0        22       112        60
OIR    2025130    131400  -10.2800 -137.0400      37.9        22       113        60
OIR    2025130    131400  -10.2800 -137.0500      37.7        22       111        60
OIR    2025130    131400  -10.2800 -137.0600      37.4        22       110        60
OIR    2025130    131400  -10.2800 -137.0700      37.4        22       111        60
OIR    2025130    131400  -10.2800 -137.0800      37.5        22       113        60
OIR    2025130    131400  -10.2800 -137.0900      37.4        22       109        60
OIR    2025130    131400  -10.2800 -137.1000      36.4        21       104        60
OIR    2025130    131400  -10.2800 -137.1100      36.0        20       104        60
OIR    2025130    131400  -10.2800 -137.1200      35.9        21       104        60
OIR    2025130    131400  -10.2800 -137.1300      36.4        22       112        60
OIR    2025130    131400  -10.2800 -137.1400      37.6        24       117        60
OIR    2025130    131400  -10.2800 -137.1500      38.7        24       120        60
OIR    2025130    131400  -10.2800 -137.1600      38.7        23       126        60
OIR    2025130    131400  -10.2800 -137.1700      38.0        20       132        60
OIR    2025130    131400  -10.2800 -137.1800      38.0        19       134        60
OIR    2025130    131400  -10.2800 -137.1900      38.2        18       132        60
OIR    2025130    131400  -10.2800 -137.2000      38.1        18       124        60
OIR    2025130    131400  -10.2800 -137.2100      38.1        18       116        60
OIR    2025130    131400  -10.2800 -137.2200      38.0        18       114        60
OIR    2025130    131400  -10.2800 -137.2300      38.0        18       110        60
OIR    2025130    131400  -10.2800 -137.2400      38.0        18       110        60
OIR    2025130    131400  -10.2800 -137.2500      37.9        18       110        60
OIR    2025130    131400  -10.2800 -137.2600      37.9        18       113        60
OIR    2025130    131400  -10.2800 -137.2700      37.7        18       113        60
OIR    2025130    131400  -10.2800 -137.2800      37.7        18       114        60
OIR    2025130    131400  -10.2800 -137.2900      37.6        17       116        60
OIR    2025130    131400  -10.2800 -137.3000      37.6        17       120        60
OIR    2025130    131400  -10.2800 -137.3100      37.5        17       120        60
OIR    2025130    131400  -10.2800 -137.3200      37.1        16       119        60
OIR    2025130    131400  -10.2800 -137.3300      36.5        15       116        60
OIR    2025130    131400  -10.2800 -137.3400      35.8        14       113        60
OIR    2025130    131400  -10.2800 -137.3500      34.5        12       111        60
OIR    2025130    131400  -10.2800 -137.3600      34.1        12       110        60
OIR    2025130    131400  -10.2800 -137.3700      33.9        11       111        60
OIR    2025130    131400  -10.2800 -137.3800      33.7        11       110        60
OIR    2025130    131400  -10.2800 -137.3900      33.6        11       109        60
OIR    2025130    131400  -10.2800 -137.4000      33.6        11       110        60
OIR    2025130    131400  -10.2800 -137.4100      33.5        10       111        60
OIR    2025130    131400  -10.2800 -137.4200      33.4         9       111        60
OIR    2025130    131400  -10.2800 -137.4300      33.2         9       110        60
OIR    2025130    131400  -10.2800 -137.4400      32.9         8       111        60
OIR    2025130    131400  -10.2800 -137.4500      32.5         7       111        60
OIR    2025130    131400  -10.2800 -137.4600      32.2         7       112        60
OIR    2025130    131400  -10.2800 -137.4700      31.9         7       112        60
OIR    2025130    131400  -10.2800 -137.4800      31.6         6       109        60
OIR    2025130    131400  -10.2800 -137.4900      31.2         6       107        60
OIR    2025130    131400  -10.2800 -137.5000      30.8         6       104        60
OIR    2025130    131400  -10.2800 -137.5100      30.6         6       104        60
OIR    2025130    131400  -10.2800 -137.5200      30.6         6       103        60
OIR    2025130    131400  -10.2800 -137.5300      30.5         6       103        60
OIR    2025130    131400  -10.2800 -137.5400      30.5         6       103        60
OIR    2025130    131400  -10.2800 -137.5500      30.4         6       103        60
OIR    2025130    131400  -10.2800 -137.5600      30.4         6       103        60
OIR    2025130    131400  -10.2800 -137.5700      30.3         6       104        60
OIR    2025130    131400  -10.2800 -137.5800      30.3         6       108        60
OIR    2025130    131400  -10.2800 -137.5900      30.3         5       110        60
OIR    2025130    131400  -10.2800 -137.6000      30.3         5       111        60
OIR    2025130    131400  -10.2800 -137.6100      30.3         5       111        60
OIR    2025130    131400  -10.2800 -137.6200      30.3         5       110        60
OIR    2025130    131400  -10.2800 -137.6300      30.3         5       109        60
OIR    2025130    131400  -10.2800 -137.6400      30.3         5       110        60
OIR    2025130    131400  -10.2800 -137.6500      30.3         5       110        60
OIR    2025130    131400  -10.2800 -137.6600      30.3         5       110        60
OIR    2025130    131400  -10.2800 -137.6700      30.3         5       111        60
OIR    2025130    131400  -10.2800 -137.6800      30.3         5       113        60
OIR    2025130    131400  -10.2800 -137.6900      30.2         4       114        60
OIR    2025130    131400  -10.2800 -137.7000      30.2         4       114        60
OIR    2025130    131400  -10.2800 -137.7100      30.0         4       115        60
OIR    2025130    131400  -10.2800 -137.7200      29.4         2       117        60
OIR    2025130    131400  -10.2800 -137.7300      28.8         1       120        60
OIR    2025130    131400  -10.2800 -137.7400      28.5         0       122        60
OIR    2025130    131400  -10.2800 -137.7500      28.2       360       123        60
OIR    2025130    131400  -10.2800 -137.7600      27.9       359       124        60
OIR    2025130    131400  -10.2800 -137.7700      27.5       359       125        60
OIR    2025130    131400  -10.2800 -137.7800      27.2       358       126        60
OIR    2025130    131400  -10.2800 -137.7900      26.8       357       127        60
OIR    2025130    131400  -10.2800 -137.8000      26.5       356       128        60
OIR    2025130    131400  -10.2800 -137.8100      26.2       356       127        60
OIR    2025130    131400  -10.2800 -137.8200      26.0       355       126        60
OIR    2025130    131400  -10.2800 -137.8300      25.8       355       124        60
OIR    2025130    131400  -10.2800 -137.8400      25.5       355       123        60
OIR    2025130    131400  -10.2800 -137.8500      25.2       355       123        60
OIR    2025130    131400  -10.2800 -137.8600      24.8       354       125        60
OIR    2025130    131400  -10.2800 -137.8700      24.5       354       128        60
OIR    2025130    131400  -10.2800 -137.8800      24.2       354       127        60
OIR    2025130    131400  -10.2800 -137.8900      24.0       353       126        60
OIR    2025130    131400  -10.2800 -137.9000      23.9       353       127        60
OIR    2025130    131400  -10.2800 -137.9100      23.9       353       129        60
OIR    2025130    131400  -10.2800 -137.9200      24.0       352       130        60
OIR    2025130    131400  -10.2800 -137.9300      24.1       351       132        60
OIR    2025130    131400  -10.2800 -137.9400      24.3       350       134        60
OIR    2025130    131400  -10.2800 -137.9500      24.5       350       137        60
OIR    2025130    131400  -10.2800 -137.9600      24.7       349       140        60
OIR    2025130    131400  -10.2800 -137.9700      24.9       348       141        60
OIR    2025130    131400  -10.2800 -137.9800      25.2       347       142        60
OIR    2025130    131400  -10.2800 -137.9900      25.5       346       144        60
OIR    2025130    131400  -10.2800 -138.0000      25.9       346       145        60
OIR    2025130    131400  -10.2800 -138.0100      26.3       345       146        60
OIR    2025130    131400  -10.2800 -138.0200      26.6       345       147        60
OIR    2025130    131400  -10.2800 -138.0300      26.8       345       148        60
OIR    2025130    131400  -10.2800 -138.0400      27.0       344       147        60
OIR    2025130    131400  -10.2800 -138.0500      27.2       344       143        60
OIR    2025130    131400  -10.2800 -138.0600      27.3       344       142        60
OIR    2025130    131400  -10.2800 -138.0700      27.5       343       141        60
OIR    2025130    131400  -10.2800 -138.0800      27.6       343       139        60
OIR    2025130    131400  -10.2800 -138.0900      27.7       343       138        60
OIR    2025130    131400  -10.2800 -138.1000      27.8       343       137        60
OIR    2025130    131400  -10.2800 -138.1100      27.8       342       137        60
OIR    2025130    131400  -10.2800 -138.1200      27.9       342       135        60
OIR    2025130    131400  -10.2800 -138.1300      28.0       342       135        60
OIR    2025130    131400  -10.2800 -138.1400      28.0       342       135        60
OIR    2025130    131400  -10.2800 -138.1500      28.0       342       135        60
OIR    2025130    131400  -10.2800 -138.1600      28.1       342       133        60
OIR    2025130    131400  -10.2800 -138.1700      28.1       342       132        60
OIR    2025130    131400  -10.2800 -138.1800      28.1       342       131        60
OIR    2025130    131400  -10.2800 -138.1900      28.2       342       128        60
OIR    2025130    131400  -10.2800 -138.2000      28.2       342       125        60
OIR    2025130    131400  -10.2800 -138.2100      28.2       342       127        60
OIR    2025130    131400  -10.2800 -138.2200      28.3       342       131        60
OIR    2025130    131400  -10.2800 -138.2300      28.3       342       132        60
OIR    2025130    131400  -10.2800 -138.2400      28.4       342       132        60
OIR    2025130    131400  -10.2800 -138.2500      28.5       341       130        60
OIR    2025130    131400  -10.2800 -138.2600      28.6       341       129        60
OIR    2025130    131400  -10.2800 -138.2700      28.6       341       130        60
OIR    2025130    131400  -10.2800 -138.2800      28.7       341       133        60
OIR    2025130    131400  -10.2800 -138.2900      28.8       341       137        60
OIR    2025130    131400  -10.2800 -138.3000      28.9       341       138        60
OIR    2025130    131400  -10.2800 -138.3100      29.0       341       139        60
OIR    2025130    131400  -10.2800 -138.3200      29.0       340       140        60
OIR    2025130    131400  -10.2800 -138.3300      29.0       340       142        60
OIR    2025130    131400  -10.2800 -138.3400      28.9       340       145        60
OIR    2025130    131400  -10.2800 -138.3500      28.9       340       148        60
OIR    2025130    131400  -10.2900 -136.2400      40.4        46       148        60
OIR    2025130    131400  -10.2900 -136.2500      41.6        46       146        60
OIR    2025130    131400  -10.2900 -136.2600      42.3        46       145        60
OIR    2025130    131400  -10.2900 -136.2700      42.9        46       143        60
OIR    2025130    131400  -10.2900 -136.2800      43.7        46       141        60
OIR    2025130    131400  -10.2900 -136.2900      44.0        46       139        60
OIR    2025130    131400  -10.2900 -136.3000      44.4        46       140        60
OIR    2025130    131400  -10.2900 -136.3100      44.6        46       141        60
OIR    2025130    131400  -10.2900 -136.3200      44.7        46       142        60
OIR    2025130    131400  -10.2900 -136.3300      44.8        45       144        60
OIR    2025130    131400  -10.2900 -136.3400      44.9        45       144        60
OIR    2025130    131400  -10.2900 -136.3500      44.8        45       146        60
OIR    2025130    131400  -10.2900 -136.3700      44.6        45       147        60
OIR    2025130    131400  -10.2900 -136.3800      44.3        45       144        60
OIR    2025130    131400  -10.2900 -136.3900      43.7        45       143        60
OIR    2025130    131400  -10.2900 -136.4000      43.4        45       142        60
OIR    2025130    131400  -10.2900 -136.4100      43.1        45       142        60
OIR    2025130    131400  -10.2900 -136.4200      42.4        45       142        60
OIR    2025130    131400  -10.2900 -136.4300      40.9        45       145        60
OIR    2025130    131400  -10.2900 -136.4400      39.8        45       147        60
OIR    2025130    131400  -10.2900 -136.4500      39.7        44       149        60
OIR    2025130    131400  -10.2900 -136.4600      41.4        42       147        60
OIR    2025130    131400  -10.2900 -136.4700      42.1        41       141        60
OIR    2025130    131400  -10.2900 -136.4800      42.1        41       141        60
OIR    2025130    131400  -10.2900 -136.4900      41.7        41       141        60
OIR    2025130    131400  -10.2900 -136.5000      41.0        42       138        60
OIR    2025130    131400  -10.2900 -136.5100      40.6        42       133        60
OIR    2025130    131400  -10.2900 -136.5200      40.4        42       132        60
OIR    2025130    131400  -10.2900 -136.5300      40.4        42       131        60
OIR    2025130    131400  -10.2900 -136.5400      40.6        42       129        60
OIR    2025130    131400  -10.2900 -136.5500      40.8        42       128        60
OIR    2025130    131400  -10.2900 -136.5600      40.6        42       126        60
OIR    2025130    131400  -10.2900 -136.5700      40.1        43       124        60
OIR    2025130    131400  -10.2900 -136.5800      39.7        43       122        60
OIR    2025130    131400  -10.2900 -136.5900      39.4        44       122        60
OIR    2025130    131400  -10.2900 -136.6000      39.2        44       124        60
OIR    2025130    131400  -10.2900 -136.6100      39.2        44       124        60
OIR    2025130    131400  -10.2900 -136.6200      39.3        44       124        60
OIR    2025130    131400  -10.2900 -136.6300      39.5        43       126        60
OIR    2025130    131400  -10.2900 -136.6400      39.9        41       128        60
OIR    2025130    131400  -10.2900 -136.6500      40.2        40       131        60
OIR    2025130    131400  -10.2900 -136.6600      40.2        40       133        60
OIR    2025130    131400  -10.2900 -136.6700      40.2        40       134        60
OIR    2025130    131400  -10.2900 -136.6800      40.1        40       133        60
OIR    2025130    131400  -10.2900 -136.6900      40.0        39       130        60
OIR    2025130    131400  -10.2900 -136.7000      40.0        39       128        60
OIR    2025130    131400  -10.2900 -136.7100      40.0        39       127        60
OIR    2025130    131400  -10.2900 -136.7200      39.9        39       126        60
OIR    2025130    131400  -10.2900 -136.7300      39.8        39       125        60
OIR    2025130    131400  -10.2900 -136.7400      39.6        40       124        60
OIR    2025130    131400  -10.2900 -136.7500      39.4        40       124        60
OIR    2025130    131400  -10.2900 -136.7600      39.3        40       123        60
OIR    2025130    131400  -10.2900 -136.7700      39.1        40       122        60
OIR    2025130    131400  -10.2900 -136.7800      39.1        40       124        60
OIR    2025130    131400  -10.2900 -136.7900      39.1        39       125        60
OIR    2025130    131400  -10.2900 -136.8000      39.3        39       126        60
OIR    2025130    131400  -10.2900 -136.8100      39.6        39       128        60
OIR    2025130    131400  -10.2900 -136.8200      40.2        38       131        60
OIR    2025130    131400  -10.2900 -136.8300      41.3        35       130        60
OIR    2025130    131400  -10.2900 -136.8400      41.8        33       129        60
OIR    2025130    131400  -10.2900 -136.8500      41.6        31       132        60
OIR    2025130    131400  -10.2900 -136.8600      41.6        31       135        60
OIR    2025130    131400  -10.2900 -136.8700      41.6        31       137        60
OIR    2025130    131400  -10.2900 -136.8800      41.6        31       139        60
OIR    2025130    131400  -10.2900 -136.8900      41.5        31       142        60
OIR    2025130    131400  -10.2900 -136.9000      41.4        31       146        60
OIR    2025130    131400  -10.2900 -136.9300      39.6        29       148        60
OIR    2025130    131400  -10.2900 -136.9400      38.6        27       144        60
OIR    2025130    131400  -10.2900 -136.9500      38.1        25       140        60
OIR    2025130    131400  -10.2900 -136.9600      37.9        24       139        60
OIR    2025130    131400  -10.2900 -136.9700      37.9        23       137        60
OIR    2025130    131400  -10.2900 -136.9800      38.0        22       129        60
OIR    2025130    131400  -10.2900 -136.9900      38.1        22       121        60
OIR    2025130    131400  -10.2900 -137.0000      38.1        22       119        60
OIR    2025130    131400  -10.2900 -137.0100      38.1        22       116        60
OIR    2025130    131400  -10.2900 -137.0200      38.1        22       114        60
OIR    2025130    131400  -10.2900 -137.0300      38.0        22       112        60
OIR    2025130    131400  -10.2900 -137.0400      38.0        22       111        60
OIR    2025130    131400  -10.2900 -137.0500      37.9        22       111        60
OIR    2025130    131400  -10.2900 -137.0600      37.7        22       111        60
OIR    2025130    131400  -10.2900 -137.0700      37.6        22       113        60
OIR    2025130    131400  -10.2900 -137.0800      37.6        22       116        60
OIR    2025130    131400  -10.2900 -137.0900      37.6        22       110        60
OIR    2025130    131400  -10.2900 -137.1000      37.3        22       105        60
OIR    2025130    131400  -10.2900 -137.1100      36.6        21       105        60
OIR    2025130    131400  -10.2900 -137.1200      36.9        21       107        60
OIR    2025130    131400  -10.2900 -137.1300      37.8        22       113        60
OIR    2025130    131400  -10.2900 -137.1400      39.0        24       116        60
OIR    2025130    131400  -10.2900 -137.1500      39.4        24       121        60
OIR    2025130    131400  -10.2900 -137.1600      39.2        23       128        60
OIR    2025130    131400  -10.2900 -137.1700      37.9        18       135        60
OIR    2025130    131400  -10.2900 -137.1800      38.0        18       137        60
OIR    2025130    131400  -10.2900 -137.1900      38.1        18       135        60
OIR    2025130    131400  -10.2900 -137.2000      38.1        18       124        60
OIR    2025130    131400  -10.2900 -137.2100      38.1        18       115        60
OIR    2025130    131400  -10.2900 -137.2200      38.0        18       111        60
OIR    2025130    131400  -10.2900 -137.2300      38.0        18       108        60
OIR    2025130    131400  -10.2900 -137.2400      38.0        18       108        60
OIR    2025130    131400  -10.2900 -137.2500      37.9        18       108        60
OIR    2025130    131400  -10.2900 -137.2600      37.9        17       110        60
OIR    2025130    131400  -10.2900 -137.2700      37.8        17       112        60
OIR    2025130    131400  -10.2900 -137.2800      37.7        17       114        60
OIR    2025130    131400  -10.2900 -137.2900      37.7        17       116        60
OIR    2025130    131400  -10.2900 -137.3000      37.6        17       119        60
OIR    2025130    131400  -10.2900 -137.3100      37.5        17       119        60
OIR    2025130    131400  -10.2900 -137.3200      36.9        16       116        60
OIR    2025130    131400  -10.2900 -137.3300      36.4        15       115        60
OIR    2025130    131400  -10.2900 -137.3400      35.7        14       112        60
OIR    2025130    131400  -10.2900 -137.3500      34.4        12       111        60
OIR    2025130    131400  -10.2900 -137.3600      34.1        12       111        60
OIR    2025130    131400  -10.2900 -137.3700      33.9        11       113        60
OIR    2025130    131400  -10.2900 -137.3800      33.7        11       112        60
OIR    2025130    131400  -10.2900 -137.3900      33.7        11       111        60
OIR    2025130    131400  -10.2900 -137.4000      33.6        11       110        60
OIR    2025130    131400  -10.2900 -137.4100      33.5        10       111        60
OIR    2025130    131400  -10.2900 -137.4200      33.3         9       110        60
OIR    2025130    131400  -10.2900 -137.4300      33.0         8       109        60
OIR    2025130    131400  -10.2900 -137.4400      32.7         7       108        60
OIR    2025130    131400  -10.2900 -137.4500      32.4         7       108        60
OIR    2025130    131400  -10.2900 -137.4600      32.1         6       108        60
OIR    2025130    131400  -10.2900 -137.4700      32.0         6       108        60
OIR    2025130    131400  -10.2900 -137.4800      31.8         6       105        60
OIR    2025130    131400  -10.2900 -137.4900      31.3         6       104        60
OIR    2025130    131400  -10.2900 -137.5000      30.9         6       104        60
OIR    2025130    131400  -10.2900 -137.5100      30.7         6       104        60
OIR    2025130    131400  -10.2900 -137.5200      30.6         6       103        60
OIR    2025130    131400  -10.2900 -137.5300      30.6         6       103        60
OIR    2025130    131400  -10.2900 -137.5400      30.6         6       103        60
OIR    2025130    131400  -10.2900 -137.5500      30.5         6       103        60
OIR    2025130    131400  -10.2900 -137.5600      30.4         6       103        60
OIR    2025130    131400  -10.2900 -137.5700      30.4         6       104        60
OIR    2025130    131400  -10.2900 -137.5800      30.4         5       105        60
OIR    2025130    131400  -10.2900 -137.5900      30.4         5       109        60
OIR    2025130    131400  -10.2900 -137.6000      30.4         5       109        60
OIR    2025130    131400  -10.2900 -137.6100      30.4         5       109        60
OIR    2025130    131400  -10.2900 -137.6200      30.4         5       108        60
OIR    2025130    131400  -10.2900 -137.6300      30.3         5       108        60
OIR    2025130    131400  -10.2900 -137.6400      30.3         5       109        60
OIR    2025130    131400  -10.2900 -137.6500      30.3         5       111        60
OIR    2025130    131400  -10.2900 -137.6600      30.3         5       111        60
OIR    2025130    131400  -10.2900 -137.6700      30.3         5       112        60
OIR    2025130    131400  -10.2900 -137.6800      30.3         5       112        60
OIR    2025130    131400  -10.2900 -137.6900      30.2         4       114        60
OIR    2025130    131400  -10.2900 -137.7000      30.2         4       116        60
OIR    2025130    131400  -10.2900 -137.7100      30.0         4       117        60
OIR    2025130    131400  -10.2900 -137.7200      29.3         2       120        60
OIR    2025130    131400  -10.2900 -137.7300      28.7         1       122        60
OIR    2025130    131400  -10.2900 -137.7400      28.4         0       123        60
OIR    2025130    131400  -10.2900 -137.7500      28.1         0       123        60
OIR    2025130    131400  -10.2900 -137.7600      27.8       360       124        60
OIR    2025130    131400  -10.2900 -137.7700      27.3       359       125        60
OIR    2025130    131400  -10.2900 -137.7800      26.8       358       126        60
OIR    2025130    131400  -10.2900 -137.7900      26.4       357       127        60
OIR    2025130    131400  -10.2900 -137.8000      26.2       357       128        60
OIR    2025130    131400  -10.2900 -137.8100      25.8       356       127        60
OIR    2025130    131400  -10.2900 -137.8200      25.4       355       126        60
OIR    2025130    131400  -10.2900 -137.8300      25.1       355       124        60
OIR    2025130    131400  -10.2900 -137.8400      24.8       355       124        60
OIR    2025130    131400  -10.2900 -137.8500      24.5       355       124        60
OIR    2025130    131400  -10.2900 -137.8600      24.2       355       127        60
OIR    2025130    131400  -10.2900 -137.8700      23.9       354       129        60
OIR    2025130    131400  -10.2900 -137.8800      23.7       354       129        60
OIR    2025130    131400  -10.2900 -137.8900      23.6       354       129        60
OIR    2025130    131400  -10.2900 -137.9000      23.5       353       129        60
OIR    2025130    131400  -10.2900 -137.9100      23.5       353       130        60
OIR    2025130    131400  -10.2900 -137.9200      23.5       352       131        60
OIR    2025130    131400  -10.2900 -137.9300      23.6       352       133        60
OIR    2025130    131400  -10.2900 -137.9400      23.8       351       135        60
OIR    2025130    131400  -10.2900 -137.9500      24.0       350       138        60
OIR    2025130    131400  -10.2900 -137.9600      24.2       349       141        60
OIR    2025130    131400  -10.2900 -137.9700      24.5       349       141        60
OIR    2025130    131400  -10.2900 -137.9800      24.9       348       141        60
OIR    2025130    131400  -10.2900 -137.9900      25.3       347       142        60
OIR    2025130    131400  -10.2900 -138.0000      25.6       346       143        60
OIR    2025130    131400  -10.2900 -138.0100      25.9       346       143        60
OIR    2025130    131400  -10.2900 -138.0200      26.4       346       143        60
OIR    2025130    131400  -10.2900 -138.0300      26.7       345       143        60
OIR    2025130    131400  -10.2900 -138.0400      26.9       345       142        60
OIR    2025130    131400  -10.2900 -138.0500      27.0       345       141        60
OIR    2025130    131400  -10.2900 -138.0600      27.2       344       140        60
OIR    2025130    131400  -10.2900 -138.0700      27.3       344       140        60
OIR    2025130    131400  -10.2900 -138.0800      27.4       343       138        60
OIR    2025130    131400  -10.2900 -138.0900      27.5       343       137        60
OIR    2025130    131400  -10.2900 -138.1000      27.6       343       136        60
OIR    2025130    131400  -10.2900 -138.1100      27.7       343       136        60
OIR    2025130    131400  -10.2900 -138.1200      27.8       342       135        60
OIR    2025130    131400  -10.2900 -138.1300      27.9       342       135        60
OIR    2025130    131400  -10.2900 -138.1400      28.0       342       135        60
OIR    2025130    131400  -10.2900 -138.1500      28.0       342       134        60
OIR    2025130    131400  -10.2900 -138.1600      28.1       342       132        60
OIR    2025130    131400  -10.2900 -138.1700      28.1       342       131        60
OIR    2025130    131400  -10.2900 -138.1800      28.1       342       130        60
OIR    2025130    131400  -10.2900 -138.1900      28.2       342       128        60
OIR    2025130    131400  -10.2900 -138.2000      28.2       342       126        60
OIR    2025130    131400  -10.2900 -138.2100      28.2       342       127        60
OIR    2025130    131400  -10.2900 -138.2200      28.3       342       128        60
OIR    2025130    131400  -10.2900 -138.2300      28.4       342       130        60
OIR    2025130    131400  -10.2900 -138.2400      28.5       342       131        60
OIR    2025130    131400  -10.2900 -138.2500      28.6       342       130        60
OIR    2025130    131400  -10.2900 -138.2600      28.7       341       130        60
OIR    2025130    131400  -10.2900 -138.2700      28.8       341       130        60
OIR    2025130    131400  -10.2900 -138.2800      28.9       341       132        60
OIR    2025130    131400  -10.2900 -138.2900      29.0       341       135        60
OIR    2025130    131400  -10.2900 -138.3000      29.1       341       135        60
OIR    2025130    131400  -10.2900 -138.3100      29.2       341       136        60
OIR    2025130    131400  -10.2900 -138.3200      29.2       341       138        60
OIR    2025130    131400  -10.2900 -138.3300      29.0       340       140        60
OIR    2025130    131400  -10.2900 -138.3400      29.0       340       142        60
OIR    2025130    131400  -10.2900 -138.3500      29.0       340       144        60
OIR    2025130    131400  -10.2900 -138.3600      29.0       340       146        60
OIR    2025130    131400  -10.2900 -138.3700      29.0       340       147        60
OIR    2025130    131400  -10.2900 -138.3800      29.0       340       148        60
OIR    2025130    131400  -10.2900 -138.3900      29.0       340       149        60
OIR    2025130    131400  -10.3000 -136.2900      43.9        45       146        60
OIR    2025130    131400  -10.3000 -136.3000      44.3        45       143        60
OIR    2025130    131400  -10.3000 -136.3100      44.5        45       142        60
OIR    2025130    131400  -10.3000 -136.3200      44.5        45       144        60
OIR    2025130    131400  -10.3000 -136.3300      44.6        45       146        60
OIR    2025130    131400  -10.3000 -136.3400      44.7        45       143        60
OIR    2025130    131400  -10.3000 -136.3500      44.7        45       143        60
OIR    2025130    131400  -10.3000 -136.3600      44.6        45       145        60
OIR    2025130    131400  -10.3000 -136.3700      44.5        45       144        60
OIR    2025130    131400  -10.3000 -136.3800      44.4        45       144        60
OIR    2025130    131400  -10.3000 -136.3900      44.0        45       145        60
OIR    2025130    131400  -10.3000 -136.4000      43.5        45       145        60
OIR    2025130    131400  -10.3000 -136.4100      43.2        44       140        60
OIR    2025130    131400  -10.3000 -136.4200      42.8        44       137        60
OIR    2025130    131400  -10.3000 -136.4300      42.3        43       139        60
OIR    2025130    131400  -10.3000 -136.4400      41.8        43       142        60
OIR    2025130    131400  -10.3000 -136.4500      42.0        41       145        60
OIR    2025130    131400  -10.3000 -136.4600      42.4        41       146        60
OIR    2025130    131400  -10.3000 -136.4700      42.5        40       146        60
OIR    2025130    131400  -10.3000 -136.4800      42.5        40       145        60
OIR    2025130    131400  -10.3000 -136.4900      42.4        40       145        60
OIR    2025130    131400  -10.3000 -136.5000      42.3        40       142        60
OIR    2025130    131400  -10.3000 -136.5100      42.1        41       137        60
OIR    2025130    131400  -10.3000 -136.5200      41.8        40       136        60
OIR    2025130    131400  -10.3000 -136.5300      41.7        40       134        60
OIR    2025130    131400  -10.3000 -136.5400      41.7        40       133        60
OIR    2025130    131400  -10.3000 -136.5500      41.7        40       131        60
OIR    2025130    131400  -10.3000 -136.5600      41.6        41       128        60
OIR    2025130    131400  -10.3000 -136.5700      41.3        41       125        60
OIR    2025130    131400  -10.3000 -136.5800      41.0        41       123        60
OIR    2025130    131400  -10.3000 -136.5900      40.7        42       123        60
OIR    2025130    131400  -10.3000 -136.6000      40.3        42       129        60
OIR    2025130    131400  -10.3000 -136.6100      39.8        43       130        60
OIR    2025130    131400  -10.3000 -136.6200      40.0        42       131        60
OIR    2025130    131400  -10.3000 -136.6300      40.1        41       132        60
OIR    2025130    131400  -10.3000 -136.6400      40.3        40       133        60
OIR    2025130    131400  -10.3000 -136.6500      40.4        40       134        60
OIR    2025130    131400  -10.3000 -136.6600      40.3        39       135        60
OIR    2025130    131400  -10.3000 -136.6700      40.2        39       134        60
OIR    2025130    131400  -10.3000 -136.6800      40.2        39       132        60
OIR    2025130    131400  -10.3000 -136.6900      40.0        39       129        60
OIR    2025130    131400  -10.3000 -136.7000      40.0        39       124        60
OIR    2025130    131400  -10.3000 -136.7100      39.9        39       119        60
OIR    2025130    131400  -10.3000 -136.7200      39.9        39       117        60
OIR    2025130    131400  -10.3000 -136.7300      39.8        39       119        60
OIR    2025130    131400  -10.3000 -136.7400      39.7        39       120        60
OIR    2025130    131400  -10.3000 -136.7500      39.6        39       122        60
OIR    2025130    131400  -10.3000 -136.7600      39.5        39       121        60
OIR    2025130    131400  -10.3000 -136.7700      39.3        39       121        60
OIR    2025130    131400  -10.3000 -136.7800      39.2        39       125        60
OIR    2025130    131400  -10.3000 -136.7900      39.2        39       127        60
OIR    2025130    131400  -10.3000 -136.8000      39.3        39       127        60
OIR    2025130    131400  -10.3000 -136.8100      39.5        39       128        60
OIR    2025130    131400  -10.3000 -136.8200      40.1        38       132        60
OIR    2025130    131400  -10.3000 -136.8300      41.2        35       133        60
OIR    2025130    131400  -10.3000 -136.8400      41.8        32       135        60
OIR    2025130    131400  -10.3000 -136.8500      41.7        31       135        60
OIR    2025130    131400  -10.3000 -136.8600      41.6        31       135        60
OIR    2025130    131400  -10.3000 -136.8700      41.6        31       136        60
OIR    2025130    131400  -10.3000 -136.8800      41.6        31       137        60
OIR    2025130    131400  -10.3000 -136.8900      41.5        31       137        60
OIR    2025130    131400  -10.3000 -136.9000      41.5        31       141        60
OIR    2025130    131400  -10.3000 -136.9100      41.3        31       148        60
OIR    2025130    131400  -10.3000 -136.9300      40.9        30       146        60
OIR    2025130    131400  -10.3000 -136.9400      39.6        29       143        60
OIR    2025130    131400  -10.3000 -136.9500      38.6        26       141        60
OIR    2025130    131400  -10.3000 -136.9600      38.3        24       139        60
OIR    2025130    131400  -10.3000 -136.9700      38.2        23       136        60
OIR    2025130    131400  -10.3000 -136.9800      38.1        23       127        60
OIR    2025130    131400  -10.3000 -136.9900      38.1        22       119        60
OIR    2025130    131400  -10.3000 -137.0000      38.2        22       115        60
OIR    2025130    131400  -10.3000 -137.0100      38.1        22       114        60
OIR    2025130    131400  -10.3000 -137.0200      38.1        22       114        60
OIR    2025130    131400  -10.3000 -137.0300      38.1        22       113        60
OIR    2025130    131400  -10.3000 -137.0400      38.1        22       109        60
OIR    2025130    131400  -10.3000 -137.0500      38.0        22       110        60
OIR    2025130    131400  -10.3000 -137.0600      38.0        22       112        60
OIR    2025130    131400  -10.3000 -137.0700      37.9        22       115        60
OIR    2025130    131400  -10.3000 -137.0800      37.9        22       117        60
OIR    2025130    131400  -10.3000 -137.0900      37.8        22       114        60
OIR    2025130    131400  -10.3000 -137.1000      37.7        22       111        60
OIR    2025130    131400  -10.3000 -137.1100      37.2        21       111        60
OIR    2025130    131400  -10.3000 -137.1200      37.9        21       111        60
OIR    2025130    131400  -10.3000 -137.1300      39.1        23       114        60
OIR    2025130    131400  -10.3000 -137.1400      39.8        24       117        60
OIR    2025130    131400  -10.3000 -137.1500      39.9        24       123        60
OIR    2025130    131400  -10.3000 -137.1600      39.8        23       130        60
OIR    2025130    131400  -10.3000 -137.1700      38.0        17       137        60
OIR    2025130    131400  -10.3000 -137.1800      38.0        18       138        60
OIR    2025130    131400  -10.3000 -137.1900      38.0        17       135        60
OIR    2025130    131400  -10.3000 -137.2000      38.0        17       120        60
OIR    2025130    131400  -10.3000 -137.2100      38.0        17       109        60
OIR    2025130    131400  -10.3000 -137.2200      38.0        17       107        60
OIR    2025130    131400  -10.3000 -137.2300      38.0        17       105        60
OIR    2025130    131400  -10.3000 -137.2400      38.0        17       104        60
OIR    2025130    131400  -10.3000 -137.2500      37.9        17       104        60
OIR    2025130    131400  -10.3000 -137.2600      37.9        17       107        60
OIR    2025130    131400  -10.3000 -137.2700      37.8        17       110        60
OIR    2025130    131400  -10.3000 -137.2800      37.7        17       114        60
OIR    2025130    131400  -10.3000 -137.2900      37.7        17       115        60
OIR    2025130    131400  -10.3000 -137.3000      37.7        17       116        60
OIR    2025130    131400  -10.3000 -137.3100      37.6        17       114        60
OIR    2025130    131400  -10.3000 -137.3200      36.9        16       112        60
OIR    2025130    131400  -10.3000 -137.3300      36.3        15       110        60
OIR    2025130    131400  -10.3000 -137.3400      35.6        13       108        60
OIR    2025130    131400  -10.3000 -137.3500      34.3        12       108        60
OIR    2025130    131400  -10.3000 -137.3600      34.1        11       111        60
OIR    2025130    131400  -10.3000 -137.3700      33.9        11       115        60
OIR    2025130    131400  -10.3000 -137.3800      33.8        11       114        60
OIR    2025130    131400  -10.3000 -137.3900      33.6        11       112        60
OIR    2025130    131400  -10.3000 -137.4000      33.5        10       111        60
OIR    2025130    131400  -10.3000 -137.4100      33.4        10       110        60
OIR    2025130    131400  -10.3000 -137.4200      33.1         9       109        60
OIR    2025130    131400  -10.3000 -137.4300      32.7         7       108        60
OIR    2025130    131400  -10.3000 -137.4400      32.5         7       105        60
OIR    2025130    131400  -10.3000 -137.4500      32.3         6       104        60
OIR    2025130    131400  -10.3000 -137.4600      32.2         6       104        60
OIR    2025130    131400  -10.3000 -137.4700      32.1         6       103        60
OIR    2025130    131400  -10.3000 -137.4800      31.9         6       103        60
OIR    2025130    131400  -10.3000 -137.4900      31.7         6       103        60
OIR    2025130    131400  -10.3000 -137.5000      31.3         6       103        60
OIR    2025130    131400  -10.3000 -137.5100      31.0         6       103        60
OIR    2025130    131400  -10.3000 -137.5200      30.8         6       103        60
OIR    2025130    131400  -10.3000 -137.5300      30.7         6       103        60
OIR    2025130    131400  -10.3000 -137.5400      30.6         6       103        60
OIR    2025130    131400  -10.3000 -137.5500      30.6         5       103        60
OIR    2025130    131400  -10.3000 -137.5600      30.5         5       103        60
OIR    2025130    131400  -10.3000 -137.5700      30.5         5       103        60
OIR    2025130    131400  -10.3000 -137.5800      30.4         5       104        60
OIR    2025130    131400  -10.3000 -137.5900      30.4         5       108        60
OIR    2025130    131400  -10.3000 -137.6000      30.4         5       107        60
OIR    2025130    131400  -10.3000 -137.6100      30.4         5       105        60
OIR    2025130    131400  -10.3000 -137.6200      30.5         5       105        60
OIR    2025130    131400  -10.3000 -137.6300      30.4         5       107        60
OIR    2025130    131400  -10.3000 -137.6400      30.4         5       109        60
OIR    2025130    131400  -10.3000 -137.6500      30.4         5       111        60
OIR    2025130    131400  -10.3000 -137.6600      30.3         5       112        60
OIR    2025130    131400  -10.3000 -137.6700      30.3         5       113        60
OIR    2025130    131400  -10.3000 -137.6800      30.3         4       112        60
OIR    2025130    131400  -10.3000 -137.6900      30.3         4       114        60
OIR    2025130    131400  -10.3000 -137.7000      30.2         4       117        60
OIR    2025130    131400  -10.3000 -137.7100      30.0         4       121        60
OIR    2025130    131400  -10.3000 -137.7200      29.2         2       123        60
OIR    2025130    131400  -10.3000 -137.7300      28.6         1       124        60
OIR    2025130    131400  -10.3000 -137.7400      28.4         1       124        60
OIR    2025130    131400  -10.3000 -137.7500      28.1         0       123        60
OIR    2025130    131400  -10.3000 -137.7600      27.6       360       123        60
OIR    2025130    131400  -10.3000 -137.7700      27.1       359       124        60
OIR    2025130    131400  -10.3000 -137.7800      26.6       358       126        60
OIR    2025130    131400  -10.3000 -137.7900      26.1       357       128        60
OIR    2025130    131400  -10.3000 -137.8000      25.5       357       128        60
OIR    2025130    131400  -10.3000 -137.8100      24.9       356       127        60
OIR    2025130    131400  -10.3000 -137.8200      24.4       355       126        60
OIR    2025130    131400  -10.3000 -137.8300      23.9       355       124        60
OIR    2025130    131400  -10.3000 -137.8400      23.7       355       125        60
OIR    2025130    131400  -10.3000 -137.8500      23.7       355       126        60
OIR    2025130    131400  -10.3000 -137.8600      23.5       355       128        60
OIR    2025130    131400  -10.3000 -137.8700      23.4       354       130        60
OIR    2025130    131400  -10.3000 -137.8800      23.3       354       131        60
OIR    2025130    131400  -10.3000 -137.8900      23.2       354       132        60
OIR    2025130    131400  -10.3000 -137.9000      23.1       353       131        60
OIR    2025130    131400  -10.3000 -137.9100      23.1       353       132        60
OIR    2025130    131400  -10.3000 -137.9200      23.1       352       133        60
OIR    2025130    131400  -10.3000 -137.9300      23.1       352       134        60
OIR    2025130    131400  -10.3000 -137.9400      23.2       351       136        60
OIR    2025130    131400  -10.3000 -137.9500      23.3       351       139        60
OIR    2025130    131400  -10.3000 -137.9600      23.4       350       142        60
OIR    2025130    131400  -10.3000 -137.9700      23.7       349       141        60
OIR    2025130    131400  -10.3000 -137.9800      24.3       348       140        60
OIR    2025130    131400  -10.3000 -137.9900      24.8       347       140        60
OIR    2025130    131400  -10.3000 -138.0000      25.2       347       140        60
OIR    2025130    131400  -10.3000 -138.0100      25.6       347       140        60
OIR    2025130    131400  -10.3000 -138.0200      26.2       346       139        60
OIR    2025130    131400  -10.3000 -138.0300      26.5       346       137        60
OIR    2025130    131400  -10.3000 -138.0400      26.7       346       137        60
OIR    2025130    131400  -10.3000 -138.0500      26.9       345       139        60
OIR    2025130    131400  -10.3000 -138.0600      27.0       345       139        60
OIR    2025130    131400  -10.3000 -138.0700      27.1       344       138        60
OIR    2025130    131400  -10.3000 -138.0800      27.2       344       137        60
OIR    2025130    131400  -10.3000 -138.0900      27.3       344       136        60
OIR    2025130    131400  -10.3000 -138.1000      27.4       343       135        60
OIR    2025130    131400  -10.3000 -138.1100      27.6       343       135        60
OIR    2025130    131400  -10.3000 -138.1200      27.7       343       135        60
OIR    2025130    131400  -10.3000 -138.1300      27.8       342       135        60
OIR    2025130    131400  -10.3000 -138.1400      27.9       342       134        60
OIR    2025130    131400  -10.3000 -138.1500      28.0       342       133        60
OIR    2025130    131400  -10.3000 -138.1600      28.0       342       130        60
OIR    2025130    131400  -10.3000 -138.1700      28.1       342       130        60
OIR    2025130    131400  -10.3000 -138.1800      28.1       342       130        60
OIR    2025130    131400  -10.3000 -138.1900      28.2       342       129        60
OIR    2025130    131400  -10.3000 -138.2000      28.2       342       128        60
OIR    2025130    131400  -10.3000 -138.2100      28.3       342       126        60
OIR    2025130    131400  -10.3000 -138.2200      28.3       342       126        60
OIR    2025130    131400  -10.3000 -138.2300      28.5       342       128        60
OIR    2025130    131400  -10.3000 -138.2400      28.7       342       129        60
OIR    2025130    131400  -10.3000 -138.2500      29.0       342       131        60
OIR    2025130    131400  -10.3000 -138.2600      29.2       342       131        60
OIR    2025130    131400  -10.3000 -138.2700      29.5       341       130        60
OIR    2025130    131400  -10.3000 -138.2800      29.8       341       131        60
OIR    2025130    131400  -10.3000 -138.2900      30.0       341       133        60
OIR    2025130    131400  -10.3000 -138.3000      30.2       341       133        60
OIR    2025130    131400  -10.3000 -138.3100      30.2       341       134        60
OIR    2025130    131400  -10.3000 -138.3200      30.1       341       135        60
OIR    2025130    131400  -10.3000 -138.3300      29.9       340       137        60
OIR    2025130    131400  -10.3000 -138.3400      29.4       340       139        60
OIR    2025130    131400  -10.3000 -138.3500      29.1       340       140        60
OIR    2025130    131400  -10.3000 -138.3600      29.0       340       141        60
OIR    2025130    131400  -10.3000 -138.3700      29.0       340       142        60
OIR    2025130    131400  -10.3000 -138.3800      29.0       340       142        60
OIR    2025130    131400  -10.3000 -138.3900      29.0       340       145        60
OIR    2025130    131400  -10.3000 -138.4000      29.0       340       149        60
OIR    2025130    131400  -10.3000 -138.4100      28.9       340       149        60
OIR    2025130    131400  -10.3100 -136.3000      44.2        45       146        60
OIR    2025130    131400  -10.3100 -136.3100      44.4        45       145        60
OIR    2025130    131400  -10.3100 -136.3200      44.5        45       147        60
OIR    2025130    131400  -10.3100 -136.3300      44.5        45       148        60
OIR    2025130    131400  -10.3100 -136.3400      44.6        45       145        60
OIR    2025130    131400  -10.3100 -136.3500      44.6        45       143        60
OIR    2025130    131400  -10.3100 -136.3600      44.6        45       142        60
OIR    2025130    131400  -10.3100 -136.3700      44.5        45       144        60
OIR    2025130    131400  -10.3100 -136.3800      44.4        45       145        60
OIR    2025130    131400  -10.3100 -136.3900      44.2        45       147        60
OIR    2025130    131400  -10.3100 -136.4000      43.7        44       148        60
OIR    2025130    131400  -10.3100 -136.4100      43.1        44       141        60
OIR    2025130    131400  -10.3100 -136.4200      42.8        43       137        60
OIR    2025130    131400  -10.3100 -136.4300      42.7        42       137        60
OIR    2025130    131400  -10.3100 -136.4400      42.4        41       138        60
OIR    2025130    131400  -10.3100 -136.4500      42.4        40       140        60
OIR    2025130    131400  -10.3100 -136.4600      42.4        40       142        60
OIR    2025130    131400  -10.3100 -136.4700      42.4        40       144        60
OIR    2025130    131400  -10.3100 -136.4800      42.4        40       145        60
OIR    2025130    131400  -10.3100 -136.4900      42.4        40       146        60
OIR    2025130    131400  -10.3100 -136.5000      42.4        40       144        60
OIR    2025130    131400  -10.3100 -136.5100      42.3        40       142        60
OIR    2025130    131400  -10.3100 -136.5200      42.0        40       140        60
OIR    2025130    131400  -10.3100 -136.5300      41.9        40       138        60
OIR    2025130    131400  -10.3100 -136.5400      41.9        40       135        60
OIR    2025130    131400  -10.3100 -136.5500      41.9        40       132        60
OIR    2025130    131400  -10.3100 -136.5600      41.8        40       130        60
OIR    2025130    131400  -10.3100 -136.5700      41.8        40       128        60
OIR    2025130    131400  -10.3100 -136.5800      41.7        40       127        60
OIR    2025130    131400  -10.3100 -136.5900      41.5        40       129        60
OIR    2025130    131400  -10.3100 -136.6000      41.3        41       135        60
OIR    2025130    131400  -10.3100 -136.6100      40.9        41       134        60
OIR    2025130    131400  -10.3100 -136.6200      40.8        40       132        60
OIR    2025130    131400  -10.3100 -136.6300      40.7        40       133        60
OIR    2025130    131400  -10.3100 -136.6400      40.6        39       133        60
OIR    2025130    131400  -10.3100 -136.6500      40.5        39       133        60
OIR    2025130    131400  -10.3100 -136.6600      40.5        39       132        60
OIR    2025130    131400  -10.3100 -136.6700      40.4        39       128        60
OIR    2025130    131400  -10.3100 -136.6800      40.2        39       125        60
OIR    2025130    131400  -10.3100 -136.6900      40.1        39       123        60
OIR    2025130    131400  -10.3100 -136.7000      40.0        39       120        60
OIR    2025130    131400  -10.3100 -136.7100      39.9        39       116        60
OIR    2025130    131400  -10.3100 -136.7200      39.9        39       116        60
OIR    2025130    131400  -10.3100 -136.7300      39.8        39       116        60
OIR    2025130    131400  -10.3100 -136.7400      39.7        39       116        60
OIR    2025130    131400  -10.3100 -136.7500      39.7        39       117        60
OIR    2025130    131400  -10.3100 -136.7600      39.6        39       117        60
OIR    2025130    131400  -10.3100 -136.7700      39.5        39       120        60
OIR    2025130    131400  -10.3100 -136.7800      39.4        39       122        60
OIR    2025130    131400  -10.3100 -136.7900      39.3        39       124        60
OIR    2025130    131400  -10.3100 -136.8000      39.3        39       125        60
OIR    2025130    131400  -10.3100 -136.8100      39.5        39       127        60
OIR    2025130    131400  -10.3100 -136.8200      39.8        38       130        60
OIR    2025130    131400  -10.3100 -136.8300      40.9        35       131        60
OIR    2025130    131400  -10.3100 -136.8400      41.5        33       133        60
OIR    2025130    131400  -10.3100 -136.8500      41.6        31       134        60
OIR    2025130    131400  -10.3100 -136.8600      41.6        31       135        60
OIR    2025130    131400  -10.3100 -136.8700      41.6        31       134        60
OIR    2025130    131400  -10.3100 -136.8800      41.6        31       134        60
OIR    2025130    131400  -10.3100 -136.8900      41.6        31       134        60
OIR    2025130    131400  -10.3100 -136.9000      41.6        31       138        60
OIR    2025130    131400  -10.3100 -136.9100      41.5        31       144        60
OIR    2025130    131400  -10.3100 -136.9200      41.4        30       147        60
OIR    2025130    131400  -10.3100 -136.9300      41.5        30       147        60
OIR    2025130    131400  -10.3100 -136.9400      41.1        30       146        60
OIR    2025130    131400  -10.3100 -136.9500      39.4        28       146        60
OIR    2025130    131400  -10.3100 -136.9600      38.7        26       143        60
OIR    2025130    131400  -10.3100 -136.9700      38.5        24       140        60
OIR    2025130    131400  -10.3100 -136.9800      38.2        23       131        60
OIR    2025130    131400  -10.3100 -136.9900      38.3        23       122        60
OIR    2025130    131400  -10.3100 -137.0000      38.2        22       115        60
OIR    2025130    131400  -10.3100 -137.0100      38.1        22       113        60
OIR    2025130    131400  -10.3100 -137.0200      38.1        22       114        60
OIR    2025130    131400  -10.3100 -137.0300      38.1        22       112        60
OIR    2025130    131400  -10.3100 -137.0400      38.1        22       108        60
OIR    2025130    131400  -10.3100 -137.0500      38.1        22       109        60
OIR    2025130    131400  -10.3100 -137.0600      38.1        22       112        60
OIR    2025130    131400  -10.3100 -137.0700      38.0        22       115        60
OIR    2025130    131400  -10.3100 -137.0800      38.1        22       117        60
OIR    2025130    131400  -10.3100 -137.0900      38.3        22       116        60
OIR    2025130    131400  -10.3100 -137.1000      38.4        22       116        60
OIR    2025130    131400  -10.3100 -137.1100      38.9        23       114        60
OIR    2025130    131400  -10.3100 -137.1200      39.5        23       112        60
OIR    2025130    131400  -10.3100 -137.1300      39.8        23       112        60
OIR    2025130    131400  -10.3100 -137.1400      39.9        24       113        60
OIR    2025130    131400  -10.3100 -137.1500      39.9        24       116        60
OIR    2025130    131400  -10.3100 -137.1600      39.9        24       125        60
OIR    2025130    131400  -10.3100 -137.1700      37.9        17       134        60
OIR    2025130    131400  -10.3100 -137.1800      37.9        17       133        60
OIR    2025130    131400  -10.3100 -137.1900      37.9        17       126        60
OIR    2025130    131400  -10.3100 -137.2000      37.9        17       116        60
OIR    2025130    131400  -10.3100 -137.2100      37.9        17       109        60
OIR    2025130    131400  -10.3100 -137.2200      37.9        17       107        60
OIR    2025130    131400  -10.3100 -137.2300      37.9        17       104        60
OIR    2025130    131400  -10.3100 -137.2400      37.9        17       104        60
OIR    2025130    131400  -10.3100 -137.2500      37.9        17       104        60
OIR    2025130    131400  -10.3100 -137.2600      37.8        17       107        60
OIR    2025130    131400  -10.3100 -137.2700      37.8        17       111        60
OIR    2025130    131400  -10.3100 -137.2800      37.7        17       114        60
OIR    2025130    131400  -10.3100 -137.2900      37.7        17       116        60
OIR    2025130    131400  -10.3100 -137.3000      37.7        17       116        60
OIR    2025130    131400  -10.3100 -137.3100      37.5        17       115        60
OIR    2025130    131400  -10.3100 -137.3200      36.7        16       113        60
OIR    2025130    131400  -10.3100 -137.3300      36.1        15       110        60
OIR    2025130    131400  -10.3100 -137.3400      35.4        14       109        60
OIR    2025130    131400  -10.3100 -137.3500      34.2        12       109        60
OIR    2025130    131400  -10.3100 -137.3600      34.0        11       110        60
OIR    2025130    131400  -10.3100 -137.3700      33.9        11       112        60
OIR    2025130    131400  -10.3100 -137.3800      33.8        11       112        60
OIR    2025130    131400  -10.3100 -137.3900      33.6        11       111        60
OIR    2025130    131400  -10.3100 -137.4000      33.4        10       109        60
OIR    2025130    131400  -10.3100 -137.4100      33.2         9       108        60
OIR    2025130    131400  -10.3100 -137.4200      32.9         8       107        60
OIR    2025130    131400  -10.3100 -137.4300      32.5         7       105        60
OIR    2025130    131400  -10.3100 -137.4400      32.3         6       105        60
OIR    2025130    131400  -10.3100 -137.4500      32.2         6       105        60
OIR    2025130    131400  -10.3100 -137.4600      32.1         6       104        60
OIR    2025130    131400  -10.3100 -137.4700      32.1         5       104        60
OIR    2025130    131400  -10.3100 -137.4800      32.0         5       105        60
OIR    2025130    131400  -10.3100 -137.4900      31.8         5       105        60
OIR    2025130    131400  -10.3100 -137.5000      31.6         5       105        60
OIR    2025130    131400  -10.3100 -137.5100      31.3         5       104        60
OIR    2025130    131400  -10.3100 -137.5200      31.0         5       104        60
OIR    2025130    131400  -10.3100 -137.5300      30.9         5       103        60
OIR    2025130    131400  -10.3100 -137.5400      30.9         5       103        60
OIR    2025130    131400  -10.3100 -137.5500      30.9         5       104        60
OIR    2025130    131400  -10.3100 -137.5600      30.8         5       104        60
OIR    2025130    131400  -10.3100 -137.5700      30.8         5       104        60
OIR    2025130    131400  -10.3100 -137.5800      30.7         5       104        60
OIR    2025130    131400  -10.3100 -137.5900      30.7         5       107        60
OIR    2025130    131400  -10.3100 -137.6000      30.7         5       105        60
OIR    2025130    131400  -10.3100 -137.6100      30.7         5       105        60
OIR    2025130    131400  -10.3100 -137.6200      30.7         5       104        60
OIR    2025130    131400  -10.3100 -137.6300      30.6         5       105        60
OIR    2025130    131400  -10.3100 -137.6400      30.6         5       108        60
OIR    2025130    131400  -10.3100 -137.6500      30.5         5       109        60
OIR    2025130    131400  -10.3100 -137.6600      30.4         5       110        60
OIR    2025130    131400  -10.3100 -137.6700      30.4         5       112        60
OIR    2025130    131400  -10.3100 -137.6800      30.3         4       114        60
OIR    2025130    131400  -10.3100 -137.6900      30.3         4       116        60
OIR    2025130    131400  -10.3100 -137.7000      30.3         4       120        60
OIR    2025130    131400  -10.3100 -137.7100      30.0         4       122        60
OIR    2025130    131400  -10.3100 -137.7200      29.2         2       124        60
OIR    2025130    131400  -10.3100 -137.7300      28.6         1       125        60
OIR    2025130    131400  -10.3100 -137.7400      28.3         1       125        60
OIR    2025130    131400  -10.3100 -137.7500      28.0         0       124        60
OIR    2025130    131400  -10.3100 -137.7600      27.5       360       124        60
OIR    2025130    131400  -10.3100 -137.7700      26.8       359       126        60
OIR    2025130    131400  -10.3100 -137.7800      25.8       359       128        60
OIR    2025130    131400  -10.3100 -137.7900      24.7       358       130        60
OIR    2025130    131400  -10.3100 -137.8000      23.5       357       131        60
OIR    2025130    131400  -10.3100 -137.8100      22.6       356       130        60
OIR    2025130    131400  -10.3100 -137.8200      22.1       356       130        60
OIR    2025130    131400  -10.3100 -137.8300      21.9       355       129        60
OIR    2025130    131400  -10.3100 -137.8400      22.1       355       129        60
OIR    2025130    131400  -10.3100 -137.8500      22.6       355       130        60
OIR    2025130    131400  -10.3100 -137.8600      22.8       355       131        60
OIR    2025130    131400  -10.3100 -137.8700      22.7       355       131        60
OIR    2025130    131400  -10.3100 -137.8800      22.7       354       132        60
OIR    2025130    131400  -10.3100 -137.8900      22.7       354       132        60
OIR    2025130    131400  -10.3100 -137.9000      22.6       354       131        60
OIR    2025130    131400  -10.3100 -137.9100      22.6       353       132        60
OIR    2025130    131400  -10.3100 -137.9200      22.7       353       132        60
OIR    2025130    131400  -10.3100 -137.9300      22.8       352       134        60
OIR    2025130    131400  -10.3100 -137.9400      22.8       352       136        60
OIR    2025130    131400  -10.3100 -137.9500      22.8       351       138        60
OIR    2025130    131400  -10.3100 -137.9600      22.7       351       140        60
OIR    2025130    131400  -10.3100 -137.9700      22.9       350       140        60
OIR    2025130    131400  -10.3100 -137.9800      23.4       349       139        60
OIR    2025130    131400  -10.3100 -137.9900      24.0       349       139        60
OIR    2025130    131400  -10.3100 -138.0000      24.6       348       139        60
OIR    2025130    131400  -10.3100 -138.0100      25.2       348       139        60
OIR    2025130    131400  -10.3100 -138.0200      25.8       347       138        60
OIR    2025130    131400  -10.3100 -138.0300      26.2       347       137        60
OIR    2025130    131400  -10.3100 -138.0400      26.4       346       137        60
OIR    2025130    131400  -10.3100 -138.0500      26.6       346       138        60
OIR    2025130    131400  -10.3100 -138.0600      26.7       346       137        60
OIR    2025130    131400  -10.3100 -138.0700      26.7       345       136        60
OIR    2025130    131400  -10.3100 -138.0800      26.9       345       136        60
OIR    2025130    131400  -10.3100 -138.0900      27.0       344       136        60
OIR    2025130    131400  -10.3100 -138.1000      27.2       344       136        60
OIR    2025130    131400  -10.3100 -138.1100      27.4       343       136        60
OIR    2025130    131400  -10.3100 -138.1200      27.6       343       135        60
OIR    2025130    131400  -10.3100 -138.1300      27.8       343       134        60
OIR    2025130    131400  -10.3100 -138.1400      27.9       342       131        60
OIR    2025130    131400  -10.3100 -138.1500      27.9       342       129        60
OIR    2025130    131400  -10.3100 -138.1600      28.0       342       128        60
OIR    2025130    131400  -10.3100 -138.1700      28.1       342       127        60
OIR    2025130    131400  -10.3100 -138.1800      28.1       342       126        60
OIR    2025130    131400  -10.3100 -138.1900      28.2       342       126        60
OIR    2025130    131400  -10.3100 -138.2000      28.2       342       126        60
OIR    2025130    131400  -10.3100 -138.2100      28.3       342       127        60
OIR    2025130    131400  -10.3100 -138.2200      28.4       342       128        60
OIR    2025130    131400  -10.3100 -138.2300      28.7       342       127        60
OIR    2025130    131400  -10.3100 -138.2400      29.0       342       128        60
OIR    2025130    131400  -10.3100 -138.2500      29.6       342       129        60
OIR    2025130    131400  -10.3100 -138.2600      30.0       341       129        60
OIR    2025130    131400  -10.3100 -138.2700      30.3       341       129        60
OIR    2025130    131400  -10.3100 -138.2800      30.4       341       131        60
OIR    2025130    131400  -10.3100 -138.2900      30.5       341       133        60
OIR    2025130    131400  -10.3100 -138.3000      30.5       341       134        60
OIR    2025130    131400  -10.3100 -138.3100      30.5       341       135        60
OIR    2025130    131400  -10.3100 -138.3200      30.4       341       139        60
OIR    2025130    131400  -10.3100 -138.3300      30.2       340       143        60
OIR    2025130    131400  -10.3100 -138.3400      29.9       340       144        60
OIR    2025130    131400  -10.3100 -138.3500      29.4       340       142        60
OIR    2025130    131400  -10.3100 -138.3600      29.1       340       139        60
OIR    2025130    131400  -10.3100 -138.3700      29.0       340       138        60
OIR    2025130    131400  -10.3100 -138.3800      29.0       340       138        60
OIR    2025130    131400  -10.3100 -138.3900      29.0       340       140        60
OIR    2025130    131400  -10.3100 -138.4000      29.0       340       143        60
OIR    2025130    131400  -10.3100 -138.4100      29.0       340       146        60
OIR    2025130    131400  -10.3100 -138.4200      28.9       340       149        60
OIR    2025130    131400  -10.3200 -136.3100      44.3        45       149        60
OIR    2025130    131400  -10.3200 -136.3400      44.5        45       149        60
OIR    2025130    131400  -10.3200 -136.3500      44.5        45       145        60
OIR    2025130    131400  -10.3200 -136.3600      44.5        45       141        60
OIR    2025130    131400  -10.3200 -136.3700      44.4        45       143        60
OIR    2025130    131400  -10.3200 -136.3800      44.3        45       147        60
OIR    2025130    131400  -10.3200 -136.3900      44.1        44       149        60
OIR    2025130    131400  -10.3200 -136.4100      43.1        42       142        60
OIR    2025130    131400  -10.3200 -136.4200      42.7        41       137        60
OIR    2025130    131400  -10.3200 -136.4300      42.5        41       136        60
OIR    2025130    131400  -10.3200 -136.4400      42.4        40       134        60
OIR    2025130    131400  -10.3200 -136.4500      42.4        40       135        60
OIR    2025130    131400  -10.3200 -136.4600      42.4        40       137        60
OIR    2025130    131400  -10.3200 -136.4700      42.4        40       140        60
OIR    2025130    131400  -10.3200 -136.4800      42.4        40       143        60
OIR    2025130    131400  -10.3200 -136.4900      42.4        40       146        60
OIR    2025130    131400  -10.3200 -136.5000      42.4        40       147        60
OIR    2025130    131400  -10.3200 -136.5100      42.3        40       146        60
OIR    2025130    131400  -10.3200 -136.5200      42.1        40       145        60
OIR    2025130    131400  -10.3200 -136.5300      42.0        40       143        60
OIR    2025130    131400  -10.3200 -136.5400      41.9        40       137        60
OIR    2025130    131400  -10.3200 -136.5500      41.9        40       132        60
OIR    2025130    131400  -10.3200 -136.5600      41.9        40       132        60
OIR    2025130    131400  -10.3200 -136.5700      41.8        40       133        60
OIR    2025130    131400  -10.3200 -136.5800      41.7        40       134        60
OIR    2025130    131400  -10.3200 -136.5900      41.6        40       137        60
OIR    2025130    131400  -10.3200 -136.6000      41.5        40       140        60
OIR    2025130    131400  -10.3200 -136.6100      41.3        40       137        60
OIR    2025130    131400  -10.3200 -136.6200      41.1        39       132        60
OIR    2025130    131400  -10.3200 -136.6300      41.0        39       132        60
OIR    2025130    131400  -10.3200 -136.6400      40.8        39       132        60
OIR    2025130    131400  -10.3200 -136.6500      40.7        39       130        60
OIR    2025130    131400  -10.3200 -136.6600      40.6        39       127        60
OIR    2025130    131400  -10.3200 -136.6700      40.5        39       120        60
OIR    2025130    131400  -10.3200 -136.6800      40.3        39       116        60
OIR    2025130    131400  -10.3200 -136.6900      40.1        39       116        60
OIR    2025130    131400  -10.3200 -136.7000      40.0        39       115        60
OIR    2025130    131400  -10.3200 -136.7100      39.9        39       115        60
OIR    2025130    131400  -10.3200 -136.7200      39.9        39       116        60
OIR    2025130    131400  -10.3200 -136.7300      39.8        39       116        60
OIR    2025130    131400  -10.3200 -136.7400      39.8        39       115        60
OIR    2025130    131400  -10.3200 -136.7500      39.7        39       113        60
OIR    2025130    131400  -10.3200 -136.7600      39.7        39       116        60
OIR    2025130    131400  -10.3200 -136.7700      39.6        39       117        60
OIR    2025130    131400  -10.3200 -136.7800      39.3        39       116        60
OIR    2025130    131400  -10.3200 -136.7900      39.3        39       117        60
OIR    2025130    131400  -10.3200 -136.8000      39.3        39       122        60
OIR    2025130    131400  -10.3200 -136.8100      39.3        38       125        60
OIR    2025130    131400  -10.3200 -136.8200      39.5        38       126        60
OIR    2025130    131400  -10.3200 -136.8300      40.3        36       127        60
OIR    2025130    131400  -10.3200 -136.8400      41.1        33       128        60
OIR    2025130    131400  -10.3200 -136.8500      41.5        31       131        60
OIR    2025130    131400  -10.3200 -136.8600      41.6        31       134        60
OIR    2025130    131400  -10.3200 -136.8700      41.6        31       133        60
OIR    2025130    131400  -10.3200 -136.8800      41.6        31       132        60
OIR    2025130    131400  -10.3200 -136.8900      41.6        31       132        60
OIR    2025130    131400  -10.3200 -136.9000      41.6        31       135        60
OIR    2025130    131400  -10.3200 -136.9100      41.7        30       139        60
OIR    2025130    131400  -10.3200 -136.9200      41.7        30       144        60
OIR    2025130    131400  -10.3200 -136.9300      41.8        30       149        60
OIR    2025130    131400  -10.3200 -136.9600      40.6        27       148        60
OIR    2025130    131400  -10.3200 -136.9700      39.5        26       145        60
OIR    2025130    131400  -10.3200 -136.9800      38.6        25       136        60
OIR    2025130    131400  -10.3200 -136.9900      38.5        24       126        60
OIR    2025130    131400  -10.3200 -137.0000      38.2        23       116        60
OIR    2025130    131400  -10.3200 -137.0100      38.1        22       114        60
OIR    2025130    131400  -10.3200 -137.0200      38.1        22       114        60
OIR    2025130    131400  -10.3200 -137.0300      38.1        22       112        60
OIR    2025130    131400  -10.3200 -137.0400      38.1        22       108        60
OIR    2025130    131400  -10.3200 -137.0500      38.1        22       109        60
OIR    2025130    131400  -10.3200 -137.0600      38.1        22       111        60
OIR    2025130    131400  -10.3200 -137.0700      38.1        22       114        60
OIR    2025130    131400  -10.3200 -137.0800      38.3        22       116        60
OIR    2025130    131400  -10.3200 -137.0900      38.6        22       120        60
OIR    2025130    131400  -10.3200 -137.1000      38.9        22       121        60
OIR    2025130    131400  -10.3200 -137.1100      39.1        23       116        60
OIR    2025130    131400  -10.3200 -137.1200      39.8        23       112        60
OIR    2025130    131400  -10.3200 -137.1300      39.9        24       109        60
OIR    2025130    131400  -10.3200 -137.1400      39.9        24       108        60
OIR    2025130    131400  -10.3200 -137.1500      39.9        24       111        60
OIR    2025130    131400  -10.3200 -137.1600      39.9        23       120        60
OIR    2025130    131400  -10.3200 -137.1700      37.9        18       131        60
OIR    2025130    131400  -10.3200 -137.1800      37.9        18       129        60
OIR    2025130    131400  -10.3200 -137.1900      37.9        17       119        60
OIR    2025130    131400  -10.3200 -137.2000      37.8        17       113        60
OIR    2025130    131400  -10.3200 -137.2100      37.8        16       108        60
OIR    2025130    131400  -10.3200 -137.2200      37.8        17       105        60
OIR    2025130    131400  -10.3200 -137.2300      37.9        17       104        60
OIR    2025130    131400  -10.3200 -137.2400      37.9        17       103        60
OIR    2025130    131400  -10.3200 -137.2500      37.9        17       104        60
OIR    2025130    131400  -10.3200 -137.2600      37.8        17       108        60
OIR    2025130    131400  -10.3200 -137.2700      37.8        17       111        60
OIR    2025130    131400  -10.3200 -137.2800      37.7        17       115        60
OIR    2025130    131400  -10.3200 -137.2900      37.7        17       116        60
OIR    2025130    131400  -10.3200 -137.3000      37.7        17       116        60
OIR    2025130    131400  -10.3200 -137.3100      37.5        17       116        60
OIR    2025130    131400  -10.3200 -137.3200      36.7        16       113        60
OIR    2025130    131400  -10.3200 -137.3300      35.9        15       111        60
OIR    2025130    131400  -10.3200 -137.3400      35.2        13       109        60
OIR    2025130    131400  -10.3200 -137.3500      34.5        12       109        60
OIR    2025130    131400  -10.3200 -137.3600      34.0        11       109        60
OIR    2025130    131400  -10.3200 -137.3700      33.9        11       109        60
OIR    2025130    131400  -10.3200 -137.3800      33.7        11       109        60
OIR    2025130    131400  -10.3200 -137.3900      33.4        10       109        60
OIR    2025130    131400  -10.3200 -137.4000      33.1        10       108        60
OIR    2025130    131400  -10.3200 -137.4100      32.8         9       105        60
OIR    2025130    131400  -10.3200 -137.4200      32.5         8       104        60
OIR    2025130    131400  -10.3200 -137.4300      32.3         6       104        60
OIR    2025130    131400  -10.3200 -137.4400      32.2         6       107        60
OIR    2025130    131400  -10.3200 -137.4500      32.2         5       108        60
OIR    2025130    131400  -10.3200 -137.4600      32.1         5       107        60
OIR    2025130    131400  -10.3200 -137.4700      32.1         5       107        60
OIR    2025130    131400  -10.3200 -137.4800      32.0         5       109        60
OIR    2025130    131400  -10.3200 -137.4900      32.0         5       109        60
OIR    2025130    131400  -10.3200 -137.5000      31.9         5       109        60
OIR    2025130    131400  -10.3200 -137.5100      31.8         5       107        60
OIR    2025130    131400  -10.3200 -137.5200      31.6         5       104        60
OIR    2025130    131400  -10.3200 -137.5300      31.5         5       104        60
OIR    2025130    131400  -10.3200 -137.5400      31.4         5       104        60
OIR    2025130    131400  -10.3200 -137.5500      31.4         5       105        60
OIR    2025130    131400  -10.3200 -137.5600      31.3         5       107        60
OIR    2025130    131400  -10.3200 -137.5700      31.2         5       105        60
OIR    2025130    131400  -10.3200 -137.5800      31.1         5       105        60
OIR    2025130    131400  -10.3200 -137.5900      31.1         5       105        60
OIR    2025130    131400  -10.3200 -137.6000      31.1         5       105        60
OIR    2025130    131400  -10.3200 -137.6100      31.1         5       104        60
OIR    2025130    131400  -10.3200 -137.6200      31.1         5       104        60
OIR    2025130    131400  -10.3200 -137.6300      31.1         5       104        60
OIR    2025130    131400  -10.3200 -137.6400      30.9         5       105        60
OIR    2025130    131400  -10.3200 -137.6500      30.7         5       108        60
OIR    2025130    131400  -10.3200 -137.6600      30.6         5       109        60
OIR    2025130    131400  -10.3200 -137.6700      30.5         5       110        60
OIR    2025130    131400  -10.3200 -137.6800      30.5         4       115        60
OIR    2025130    131400  -10.3200 -137.6900      30.4         4       117        60
OIR    2025130    131400  -10.3200 -137.7000      30.4         4       121        60
OIR    2025130    131400  -10.3200 -137.7100      30.1         4       123        60
OIR    2025130    131400  -10.3200 -137.7200      29.3         2       125        60
OIR    2025130    131400  -10.3200 -137.7300      28.5         1       126        60
OIR    2025130    131400  -10.3200 -137.7400      28.2         1       126        60
OIR    2025130    131400  -10.3200 -137.7500      27.8         0       126        60
OIR    2025130    131400  -10.3200 -137.7600      27.1         0       126        60
OIR    2025130    131400  -10.3200 -137.7700      25.7       360       128        60
OIR    2025130    131400  -10.3200 -137.7800      23.9       359       130        60
OIR    2025130    131400  -10.3200 -137.7900      22.3       358       133        60
OIR    2025130    131400  -10.3200 -137.8000      21.2       357       135        60
OIR    2025130    131400  -10.3200 -137.8100      20.7       356       135        60
OIR    2025130    131400  -10.3200 -137.8200      20.5       356       134        60
OIR    2025130    131400  -10.3200 -137.8300      20.5       356       133        60
OIR    2025130    131400  -10.3200 -137.8400      20.7       356       133        60
OIR    2025130    131400  -10.3200 -137.8500      21.1       355       134        60
OIR    2025130    131400  -10.3200 -137.8600      21.5       355       133        60
OIR    2025130    131400  -10.3200 -137.8700      21.8       355       132        60
OIR    2025130    131400  -10.3200 -137.8800      22.0       354       132        60
OIR    2025130    131400  -10.3200 -137.8900      22.1       354       132        60
OIR    2025130    131400  -10.3200 -137.9000      22.2       354       131        60
OIR    2025130    131400  -10.3200 -137.9100      22.2       353       131        60
OIR    2025130    131400  -10.3200 -137.9200      22.2       353       132        60
OIR    2025130    131400  -10.3200 -137.9300      22.3       352       134        60
OIR    2025130    131400  -10.3200 -137.9400      22.3       352       136        60
OIR    2025130    131400  -10.3200 -137.9500      22.3       352       138        60
OIR    2025130    131400  -10.3200 -137.9600      22.3       351       138        60
OIR    2025130    131400  -10.3200 -137.9700      22.4       351       138        60
OIR    2025130    131400  -10.3200 -137.9800      22.7       350       139        60
OIR    2025130    131400  -10.3200 -137.9900      23.3       350       138        60
OIR    2025130    131400  -10.3200 -138.0000      24.0       349       138        60
OIR    2025130    131400  -10.3200 -138.0100      24.7       348       138        60
OIR    2025130    131400  -10.3200 -138.0200      25.3       348       137        60
OIR    2025130    131400  -10.3200 -138.0300      25.7       347       137        60
OIR    2025130    131400  -10.3200 -138.0400      26.0       347       137        60
OIR    2025130    131400  -10.3200 -138.0500      26.2       347       136        60
OIR    2025130    131400  -10.3200 -138.0600      26.2       346       135        60
OIR    2025130    131400  -10.3200 -138.0700      26.3       346       134        60
OIR    2025130    131400  -10.3200 -138.0800      26.4       345       135        60
OIR    2025130    131400  -10.3200 -138.0900      26.6       345       136        60
OIR    2025130    131400  -10.3200 -138.1000      26.8       344       137        60
OIR    2025130    131400  -10.3200 -138.1100      27.1       344       137        60
OIR    2025130    131400  -10.3200 -138.1200      27.4       343       136        60
OIR    2025130    131400  -10.3200 -138.1300      27.6       343       134        60
OIR    2025130    131400  -10.3200 -138.1400      27.8       343       130        60
OIR    2025130    131400  -10.3200 -138.1500      27.9       342       128        60
OIR    2025130    131400  -10.3200 -138.1600      27.9       342       127        60
OIR    2025130    131400  -10.3200 -138.1700      28.0       342       125        60
OIR    2025130    131400  -10.3200 -138.1800      28.1       342       124        60
OIR    2025130    131400  -10.3200 -138.1900      28.2       342       124        60
OIR    2025130    131400  -10.3200 -138.2000      28.3       342       125        60
OIR    2025130    131400  -10.3200 -138.2100      28.4       342       127        60
OIR    2025130    131400  -10.3200 -138.2200      28.6       342       129        60
OIR    2025130    131400  -10.3200 -138.2300      29.0       342       127        60
OIR    2025130    131400  -10.3200 -138.2400      29.5       342       126        60
OIR    2025130    131400  -10.3200 -138.2500      30.1       342       127        60
OIR    2025130    131400  -10.3200 -138.2600      30.4       341       128        60
OIR    2025130    131400  -10.3200 -138.2700      30.5       341       128        60
OIR    2025130    131400  -10.3200 -138.2800      30.6       341       131        60
OIR    2025130    131400  -10.3200 -138.2900      30.7       341       133        60
OIR    2025130    131400  -10.3200 -138.3000      30.7       341       135        60
OIR    2025130    131400  -10.3200 -138.3100      30.6       341       137        60
OIR    2025130    131400  -10.3200 -138.3200      30.6       341       143        60
OIR    2025130    131400  -10.3200 -138.3300      30.6       340       147        60
OIR    2025130    131400  -10.3200 -138.3400      30.3       340       146        60
OIR    2025130    131400  -10.3200 -138.3500      29.6       340       143        60
OIR    2025130    131400  -10.3200 -138.3600      29.2       340       138        60
OIR    2025130    131400  -10.3200 -138.3700      29.0       340       136        60
OIR    2025130    131400  -10.3200 -138.3800      29.0       340       136        60
OIR    2025130    131400  -10.3200 -138.3900      29.0       340       137        60
OIR    2025130    131400  -10.3200 -138.4000      29.0       340       139        60
OIR    2025130    131400  -10.3200 -138.4100      28.9       340       144        60
OIR    2025130    131400  -10.3200 -138.4200      28.9       340       149        60
OIR    2025130    131400  -10.3300 -136.3100      44.1        44       149        60
OIR    2025130    131400  -10.3300 -136.3200      44.2        44       149        60
OIR    2025130    131400  -10.3300 -136.3300      44.4        44       149        60
OIR    2025130    131400  -10.3300 -136.3400      44.4        44       149        60
OIR    2025130    131400  -10.3300 -136.3500      44.2        44       147        60
OIR    2025130    131400  -10.3300 -136.3600      44.2        44       143        60
OIR    2025130    131400  -10.3300 -136.3700      44.2        44       144        60
OIR    2025130    131400  -10.3300 -136.3800      44.0        44       146        60
OIR    2025130    131400  -10.3300 -136.3900      43.6        43       146        60
OIR    2025130    131400  -10.3300 -136.4000      43.1        42       146        60
OIR    2025130    131400  -10.3300 -136.4100      42.7        41       142        60
OIR    2025130    131400  -10.3300 -136.4200      42.5        41       139        60
OIR    2025130    131400  -10.3300 -136.4300      42.4        40       137        60
OIR    2025130    131400  -10.3300 -136.4400      42.4        40       135        60
OIR    2025130    131400  -10.3300 -136.4500      42.4        40       133        60
OIR    2025130    131400  -10.3300 -136.4600      42.4        40       134        60
OIR    2025130    131400  -10.3300 -136.4700      42.4        40       136        60
OIR    2025130    131400  -10.3300 -136.4800      42.4        40       139        60
OIR    2025130    131400  -10.3300 -136.4900      42.4        40       142        60
OIR    2025130    131400  -10.3300 -136.5000      42.4        40       144        60
OIR    2025130    131400  -10.3300 -136.5100      42.4        40       145        60
OIR    2025130    131400  -10.3300 -136.5200      42.2        40       143        60
OIR    2025130    131400  -10.3300 -136.5300      42.0        40       140        60
OIR    2025130    131400  -10.3300 -136.5400      42.0        40       135        60
OIR    2025130    131400  -10.3300 -136.5500      41.9        40       132        60
OIR    2025130    131400  -10.3300 -136.5600      41.9        40       131        60
OIR    2025130    131400  -10.3300 -136.5700      41.8        40       132        60
OIR    2025130    131400  -10.3300 -136.5800      41.7        40       134        60
OIR    2025130    131400  -10.3300 -136.5900      41.6        40       136        60
OIR    2025130    131400  -10.3300 -136.6000      41.5        40       138        60
OIR    2025130    131400  -10.3300 -136.6100      41.4        39       135        60
OIR    2025130    131400  -10.3300 -136.6200      41.2        39       130        60
OIR    2025130    131400  -10.3300 -136.6300      41.0        39       128        60
OIR    2025130    131400  -10.3300 -136.6400      40.9        39       126        60
OIR    2025130    131400  -10.3300 -136.6500      40.8        39       126        60
OIR    2025130    131400  -10.3300 -136.6600      40.7        39       125        60
OIR    2025130    131400  -10.3300 -136.6700      40.6        39       120        60
OIR    2025130    131400  -10.3300 -136.6800      40.5        39       116        60
OIR    2025130    131400  -10.3300 -136.6900      40.2        39       116        60
OIR    2025130    131400  -10.3300 -136.7000      40.1        39       116        60
OIR    2025130    131400  -10.3300 -136.7100      40.0        39       116        60
OIR    2025130    131400  -10.3300 -136.7200      39.9        39       117        60
OIR    2025130    131400  -10.3300 -136.7300      39.9        39       119        60
OIR    2025130    131400  -10.3300 -136.7400      39.8        39       117        60
OIR    2025130    131400  -10.3300 -136.7500      39.7        39       117        60
OIR    2025130    131400  -10.3300 -136.7600      39.7        39       120        60
OIR    2025130    131400  -10.3300 -136.7700      39.6        39       120        60
OIR    2025130    131400  -10.3300 -136.7800      39.3        39       116        60
OIR    2025130    131400  -10.3300 -136.7900      39.1        39       116        60
OIR    2025130    131400  -10.3300 -136.8000      39.0        39       119        60
OIR    2025130    131400  -10.3300 -136.8100      39.0        38       120        60
OIR    2025130    131400  -10.3300 -136.8200      39.1        38       120        60
OIR    2025130    131400  -10.3300 -136.8300      39.7        36       123        60
OIR    2025130    131400  -10.3300 -136.8400      40.6        34       126        60
OIR    2025130    131400  -10.3300 -136.8500      41.4        32       128        60
OIR    2025130    131400  -10.3300 -136.8600      41.5        31       131        60
OIR    2025130    131400  -10.3300 -136.8700      41.5        31       132        60
OIR    2025130    131400  -10.3300 -136.8800      41.6        31       133        60
OIR    2025130    131400  -10.3300 -136.8900      41.6        31       134        60
OIR    2025130    131400  -10.3300 -136.9000      41.7        31       136        60
OIR    2025130    131400  -10.3300 -136.9100      41.7        30       138        60
OIR    2025130    131400  -10.3300 -136.9200      41.8        30       142        60
OIR    2025130    131400  -10.3300 -136.9300      41.9        30       149        60
OIR    2025130    131400  -10.3300 -136.9700      40.1        27       146        60
OIR    2025130    131400  -10.3300 -136.9800      39.1        26       137        60
OIR    2025130    131400  -10.3300 -136.9900      38.8        25       129        60
OIR    2025130    131400  -10.3300 -137.0000      38.4        23       125        60
OIR    2025130    131400  -10.3300 -137.0100      38.2        22       121        60
OIR    2025130    131400  -10.3300 -137.0200      38.1        22       119        60
OIR    2025130    131400  -10.3300 -137.0300      38.1        22       115        60
OIR    2025130    131400  -10.3300 -137.0400      38.1        22       110        60
OIR    2025130    131400  -10.3300 -137.0500      38.1        22       111        60
OIR    2025130    131400  -10.3300 -137.0600      38.1        22       113        60
OIR    2025130    131400  -10.3300 -137.0700      38.1        22       114        60
OIR    2025130    131400  -10.3300 -137.0800      38.3        22       115        60
OIR    2025130    131400  -10.3300 -137.0900      38.7        22       119        60
OIR    2025130    131400  -10.3300 -137.1000      39.0        22       121        60
OIR    2025130    131400  -10.3300 -137.1100      39.1        22       117        60
OIR    2025130    131400  -10.3300 -137.1200      39.7        23       114        60
OIR    2025130    131400  -10.3300 -137.1300      39.8        24       109        60
OIR    2025130    131400  -10.3300 -137.1400      39.9        24       108        60
OIR    2025130    131400  -10.3300 -137.1500      39.6        23       111        60
OIR    2025130    131400  -10.3300 -137.1600      38.9        22       121        60
OIR    2025130    131400  -10.3300 -137.1700      38.0        18       133        60
OIR    2025130    131400  -10.3300 -137.1800      38.1        18       130        60
OIR    2025130    131400  -10.3300 -137.1900      37.8        16       126        60
OIR    2025130    131400  -10.3300 -137.2000      37.8        16       117        60
OIR    2025130    131400  -10.3300 -137.2100      37.8        16       110        60
OIR    2025130    131400  -10.3300 -137.2200      37.8        16       108        60
OIR    2025130    131400  -10.3300 -137.2300      37.9        17       104        60
OIR    2025130    131400  -10.3300 -137.2400      37.9        17       104        60
OIR    2025130    131400  -10.3300 -137.2500      37.9        17       104        60
OIR    2025130    131400  -10.3300 -137.2600      37.8        17       108        60
OIR    2025130    131400  -10.3300 -137.2700      37.8        17       111        60
OIR    2025130    131400  -10.3300 -137.2800      37.7        17       113        60
OIR    2025130    131400  -10.3300 -137.2900      37.7        17       115        60
OIR    2025130    131400  -10.3300 -137.3000      37.6        17       116        60
OIR    2025130    131400  -10.3300 -137.3100      37.4        17       115        60
OIR    2025130    131400  -10.3300 -137.3200      36.6        16       113        60
OIR    2025130    131400  -10.3300 -137.3300      35.8        15       110        60
OIR    2025130    131400  -10.3300 -137.3400      35.1        13       109        60
OIR    2025130    131400  -10.3300 -137.3500      34.6        12       108        60
OIR    2025130    131400  -10.3300 -137.3600      34.0        11       108        60
OIR    2025130    131400  -10.3300 -137.3700      33.9        11       107        60
OIR    2025130    131400  -10.3300 -137.3800      33.6        10       107        60
OIR    2025130    131400  -10.3300 -137.3900      33.3        10       105        60
OIR    2025130    131400  -10.3300 -137.4000      32.9         9       105        60
OIR    2025130    131400  -10.3300 -137.4100      32.6         8       104        60
OIR    2025130    131400  -10.3300 -137.4200      32.4         7       107        60
OIR    2025130    131400  -10.3300 -137.4300      32.3         6       108        60
OIR    2025130    131400  -10.3300 -137.4400      32.2         5       108        60
OIR    2025130    131400  -10.3300 -137.4500      32.2         5       108        60
OIR    2025130    131400  -10.3300 -137.4600      32.1         5       108        60
OIR    2025130    131400  -10.3300 -137.4700      32.1         5       108        60
OIR    2025130    131400  -10.3300 -137.4800      32.0         5       108        60
OIR    2025130    131400  -10.3300 -137.4900      32.0         5       108        60
OIR    2025130    131400  -10.3300 -137.5000      31.9         5       108        60
OIR    2025130    131400  -10.3300 -137.5100      31.8         5       105        60
OIR    2025130    131400  -10.3300 -137.5200      31.7         5       104        60
OIR    2025130    131400  -10.3300 -137.5300      31.6         5       104        60
OIR    2025130    131400  -10.3300 -137.5400      31.5         5       104        60
OIR    2025130    131400  -10.3300 -137.5500      31.5         5       107        60
OIR    2025130    131400  -10.3300 -137.5600      31.5         5       109        60
OIR    2025130    131400  -10.3300 -137.5700      31.5         5       108        60
OIR    2025130    131400  -10.3300 -137.5800      31.4         5       108        60
OIR    2025130    131400  -10.3300 -137.5900      31.4         5       108        60
OIR    2025130    131400  -10.3300 -137.6000      31.4         5       107        60
OIR    2025130    131400  -10.3300 -137.6100      31.4         5       107        60
OIR    2025130    131400  -10.3300 -137.6200      31.4         5       105        60
OIR    2025130    131400  -10.3300 -137.6300      31.4         5       104        60
OIR    2025130    131400  -10.3300 -137.6400      31.3         5       104        60
OIR    2025130    131400  -10.3300 -137.6500      31.2         5       107        60
OIR    2025130    131400  -10.3300 -137.6600      30.9         5       108        60
OIR    2025130    131400  -10.3300 -137.6700      30.8         5       110        60
OIR    2025130    131400  -10.3300 -137.6800      30.7         5       114        60
OIR    2025130    131400  -10.3300 -137.6900      30.6         4       117        60
OIR    2025130    131400  -10.3300 -137.7000      30.6         4       122        60
OIR    2025130    131400  -10.3300 -137.7100      30.3         4       124        60
OIR    2025130    131400  -10.3300 -137.7200      29.7         2       127        60
OIR    2025130    131400  -10.3300 -137.7300      28.7         1       128        60
OIR    2025130    131400  -10.3300 -137.7400      28.1         1       128        60
OIR    2025130    131400  -10.3300 -137.7500      27.5         1       131        60
OIR    2025130    131400  -10.3300 -137.7600      26.1         0       133        60
OIR    2025130    131400  -10.3300 -137.7700      23.7       360       134        60
OIR    2025130    131400  -10.3300 -137.7800      21.8       359       136        60
OIR    2025130    131400  -10.3300 -137.7900      20.8       358       138        60
OIR    2025130    131400  -10.3300 -137.8000      20.3       357       139        60
OIR    2025130    131400  -10.3300 -137.8100      20.1       356       139        60
OIR    2025130    131400  -10.3300 -137.8200      20.1       356       138        60
OIR    2025130    131400  -10.3300 -137.8300      20.0       356       137        60
OIR    2025130    131400  -10.3300 -137.8400      20.1       356       137        60
OIR    2025130    131400  -10.3300 -137.8500      20.2       356       137        60
OIR    2025130    131400  -10.3300 -137.8600      20.5       355       137        60
OIR    2025130    131400  -10.3300 -137.8700      21.0       355       136        60
OIR    2025130    131400  -10.3300 -137.8800      21.4       355       135        60
OIR    2025130    131400  -10.3300 -137.8900      21.6       354       134        60
OIR    2025130    131400  -10.3300 -137.9000      21.8       354       133        60
OIR    2025130    131400  -10.3300 -137.9100      21.8       354       132        60
OIR    2025130    131400  -10.3300 -137.9200      21.9       353       133        60
OIR    2025130    131400  -10.3300 -137.9300      21.8       353       133        60
OIR    2025130    131400  -10.3300 -137.9400      21.8       352       133        60
OIR    2025130    131400  -10.3300 -137.9500      21.8       352       134        60
OIR    2025130    131400  -10.3300 -137.9600      21.8       352       136        60
OIR    2025130    131400  -10.3300 -137.9700      21.9       351       136        60
OIR    2025130    131400  -10.3300 -137.9800      22.2       351       136        60
OIR    2025130    131400  -10.3300 -137.9900      22.7       351       136        60
OIR    2025130    131400  -10.3300 -138.0000      23.4       350       137        60
OIR    2025130    131400  -10.3300 -138.0100      24.2       349       137        60
OIR    2025130    131400  -10.3300 -138.0200      24.9       349       138        60
OIR    2025130    131400  -10.3300 -138.0300      25.4       348       137        60
OIR    2025130    131400  -10.3300 -138.0400      25.7       347       137        60
OIR    2025130    131400  -10.3300 -138.0500      25.8       347       137        60
OIR    2025130    131400  -10.3300 -138.0600      25.9       347       136        60
OIR    2025130    131400  -10.3300 -138.0700      26.0       346       135        60
OIR    2025130    131400  -10.3300 -138.0800      26.0       346       136        60
OIR    2025130    131400  -10.3300 -138.0900      26.2       346       137        60
OIR    2025130    131400  -10.3300 -138.1000      26.3       345       138        60
OIR    2025130    131400  -10.3300 -138.1100      26.7       344       138        60
OIR    2025130    131400  -10.3300 -138.1200      27.1       343       138        60
OIR    2025130    131400  -10.3300 -138.1300      27.4       343       136        60
OIR    2025130    131400  -10.3300 -138.1400      27.6       343       132        60
OIR    2025130    131400  -10.3300 -138.1500      27.8       343       130        60
OIR    2025130    131400  -10.3300 -138.1600      27.9       342       128        60
OIR    2025130    131400  -10.3300 -138.1700      28.0       342       126        60
OIR    2025130    131400  -10.3300 -138.1800      28.1       342       124        60
OIR    2025130    131400  -10.3300 -138.1900      28.2       342       124        60
OIR    2025130    131400  -10.3300 -138.2000      28.3       342       124        60
OIR    2025130    131400  -10.3300 -138.2100      28.5       342       127        60
OIR    2025130    131400  -10.3300 -138.2200      28.8       342       129        60
OIR    2025130    131400  -10.3300 -138.2300      29.3       342       126        60
OIR    2025130    131400  -10.3300 -138.2400      29.9       342       125        60
OIR    2025130    131400  -10.3300 -138.2500      30.4       342       126        60
OIR    2025130    131400  -10.3300 -138.2600      30.6       341       127        60
OIR    2025130    131400  -10.3300 -138.2700      30.7       341       129        60
OIR    2025130    131400  -10.3300 -138.2800      30.8       341       132        60
OIR    2025130    131400  -10.3300 -138.2900      30.8       341       135        60
OIR    2025130    131400  -10.3300 -138.3000      30.8       341       138        60
OIR    2025130    131400  -10.3300 -138.3100      30.9       341       142        60
OIR    2025130    131400  -10.3300 -138.3200      31.0       341       146        60
OIR    2025130    131400  -10.3300 -138.3300      31.1       340       148        60
OIR    2025130    131400  -10.3300 -138.3400      30.7       340       144        60
OIR    2025130    131400  -10.3300 -138.3500      29.8       340       141        60
OIR    2025130    131400  -10.3300 -138.3600      29.2       340       139        60
OIR    2025130    131400  -10.3300 -138.3700      29.1       340       138        60
OIR    2025130    131400  -10.3300 -138.3800      29.0       340       137        60
OIR    2025130    131400  -10.3300 -138.3900      29.0       340       137        60
OIR    2025130    131400  -10.3300 -138.4000      28.9       340       138        60
OIR    2025130    131400  -10.3300 -138.4100      28.9       340       144        60
OIR    2025130    131400  -10.3400 -136.3100      43.6        44       148        60
OIR    2025130    131400  -10.3400 -136.3200      43.8        44       147        60
OIR    2025130    131400  -10.3400 -136.3300      43.9        44       146        60
OIR    2025130    131400  -10.3400 -136.3400      43.9        43       148        60
OIR    2025130    131400  -10.3400 -136.3500      43.7        43       148        60
OIR    2025130    131400  -10.3400 -136.3600      43.6        43       147        60
OIR    2025130    131400  -10.3400 -136.3700      43.5        42       145        60
OIR    2025130    131400  -10.3400 -136.3800      43.2        42       144        60
OIR    2025130    131400  -10.3400 -136.3900      43.0        41       142        60
OIR    2025130    131400  -10.3400 -136.4000      42.6        41       140        60
OIR    2025130    131400  -10.3400 -136.4100      42.5        40       141        60
OIR    2025130    131400  -10.3400 -136.4200      42.4        40       141        60
OIR    2025130    131400  -10.3400 -136.4300      42.4        40       139        60
OIR    2025130    131400  -10.3400 -136.4400      42.4        40       136        60
OIR    2025130    131400  -10.3400 -136.4500      42.4        40       132        60
OIR    2025130    131400  -10.3400 -136.4600      42.4        40       131        60
OIR    2025130    131400  -10.3400 -136.4700      42.4        40       133        60
OIR    2025130    131400  -10.3400 -136.4800      42.4        40       135        60
OIR    2025130    131400  -10.3400 -136.4900      42.4        40       137        60
OIR    2025130    131400  -10.3400 -136.5000      42.4        40       139        60
OIR    2025130    131400  -10.3400 -136.5100      42.4        40       142        60
OIR    2025130    131400  -10.3400 -136.5200      42.2        40       138        60
OIR    2025130    131400  -10.3400 -136.5300      42.0        40       135        60
OIR    2025130    131400  -10.3400 -136.5400      42.0        40       133        60
OIR    2025130    131400  -10.3400 -136.5500      41.9        40       131        60
OIR    2025130    131400  -10.3400 -136.5600      41.9        40       129        60
OIR    2025130    131400  -10.3400 -136.5700      41.8        40       130        60
OIR    2025130    131400  -10.3400 -136.5800      41.8        40       133        60
OIR    2025130    131400  -10.3400 -136.5900      41.7        40       134        60
OIR    2025130    131400  -10.3400 -136.6000      41.5        39       134        60
OIR    2025130    131400  -10.3400 -136.6100      41.4        39       132        60
OIR    2025130    131400  -10.3400 -136.6200      41.3        39       128        60
OIR    2025130    131400  -10.3400 -136.6300      41.1        39       123        60
OIR    2025130    131400  -10.3400 -136.6400      41.0        39       121        60
OIR    2025130    131400  -10.3400 -136.6500      40.9        39       123        60
OIR    2025130    131400  -10.3400 -136.6600      40.8        39       124        60
OIR    2025130    131400  -10.3400 -136.6700      40.7        39       122        60
OIR    2025130    131400  -10.3400 -136.6800      40.6        39       121        60
OIR    2025130    131400  -10.3400 -136.6900      40.4        39       120        60
OIR    2025130    131400  -10.3400 -136.7000      40.2        39       120        60
OIR    2025130    131400  -10.3400 -136.7100      40.1        39       121        60
OIR    2025130    131400  -10.3400 -136.7200      40.0        39       121        60
OIR    2025130    131400  -10.3400 -136.7300      40.0        39       121        60
OIR    2025130    131400  -10.3400 -136.7400      39.9        39       123        60
OIR    2025130    131400  -10.3400 -136.7500      39.8        39       125        60
OIR    2025130    131400  -10.3400 -136.7600      39.8        39       125        60
OIR    2025130    131400  -10.3400 -136.7700      39.5        39       124        60
OIR    2025130    131400  -10.3400 -136.7800      39.3        39       117        60
OIR    2025130    131400  -10.3400 -136.7900      39.0        39       116        60
OIR    2025130    131400  -10.3400 -136.8000      38.9        38       116        60
OIR    2025130    131400  -10.3400 -136.8100      38.8        38       116        60
OIR    2025130    131400  -10.3400 -136.8200      38.8        38       116        60
OIR    2025130    131400  -10.3400 -136.8300      39.6        36       119        60
OIR    2025130    131400  -10.3400 -136.8400      40.4        34       124        60
OIR    2025130    131400  -10.3400 -136.8500      41.1        32       126        60
OIR    2025130    131400  -10.3400 -136.8600      41.4        31       128        60
OIR    2025130    131400  -10.3400 -136.8700      41.5        31       131        60
OIR    2025130    131400  -10.3400 -136.8800      41.5        31       134        60
OIR    2025130    131400  -10.3400 -136.8900      41.6        31       135        60
OIR    2025130    131400  -10.3400 -136.9000      41.7        30       135        60
OIR    2025130    131400  -10.3400 -136.9100      41.7        30       136        60
OIR    2025130    131400  -10.3400 -136.9200      41.8        30       140        60
OIR    2025130    131400  -10.3400 -136.9300      41.8        30       148        60
OIR    2025130    131400  -10.3400 -136.9700      40.2        28       145        60
OIR    2025130    131400  -10.3400 -136.9800      39.4        27       139        60
OIR    2025130    131400  -10.3400 -136.9900      39.0        25       133        60
OIR    2025130    131400  -10.3400 -137.0000      38.7        24       132        60
OIR    2025130    131400  -10.3400 -137.0100      38.1        22       129        60
OIR    2025130    131400  -10.3400 -137.0200      38.1        22       124        60
OIR    2025130    131400  -10.3400 -137.0300      38.1        22       117        60
OIR    2025130    131400  -10.3400 -137.0400      38.1        22       113        60
OIR    2025130    131400  -10.3400 -137.0500      38.1        22       113        60
OIR    2025130    131400  -10.3400 -137.0600      38.1        22       114        60
OIR    2025130    131400  -10.3400 -137.0700      38.1        22       114        60
OIR    2025130    131400  -10.3400 -137.0800      38.3        22       114        60
OIR    2025130    131400  -10.3400 -137.0900      38.7        22       119        60
OIR    2025130    131400  -10.3400 -137.1000      39.0        22       122        60
OIR    2025130    131400  -10.3400 -137.1100      39.0        22       121        60
OIR    2025130    131400  -10.3400 -137.1200      39.4        23       116        60
OIR    2025130    131400  -10.3400 -137.1300      39.8        23       110        60
OIR    2025130    131400  -10.3400 -137.1400      39.8        23       108        60
OIR    2025130    131400  -10.3400 -137.1500      39.1        21       111        60
OIR    2025130    131400  -10.3400 -137.1600      38.5        19       122        60
OIR    2025130    131400  -10.3400 -137.1700      38.2        17       133        60
OIR    2025130    131400  -10.3400 -137.1800      38.2        18       133        60
OIR    2025130    131400  -10.3400 -137.1900      37.9        16       133        60
OIR    2025130    131400  -10.3400 -137.2000      37.8        16       122        60
OIR    2025130    131400  -10.3400 -137.2100      37.8        16       112        60
OIR    2025130    131400  -10.3400 -137.2200      37.8        16       109        60
OIR    2025130    131400  -10.3400 -137.2300      37.9        17       105        60
OIR    2025130    131400  -10.3400 -137.2400      37.9        17       104        60
OIR    2025130    131400  -10.3400 -137.2500      37.9        17       104        60
OIR    2025130    131400  -10.3400 -137.2600      37.9        17       108        60
OIR    2025130    131400  -10.3400 -137.2700      37.8        17       110        60
OIR    2025130    131400  -10.3400 -137.2800      37.8        17       111        60
OIR    2025130    131400  -10.3400 -137.2900      37.7        17       113        60
OIR    2025130    131400  -10.3400 -137.3000      37.6        17       115        60
OIR    2025130    131400  -10.3400 -137.3100      37.2        17       114        60
OIR    2025130    131400  -10.3400 -137.3200      36.5        16       112        60
OIR    2025130    131400  -10.3400 -137.3300      35.6        14       110        60
OIR    2025130    131400  -10.3400 -137.3400      35.0        13       108        60
OIR    2025130    131400  -10.3400 -137.3500      34.6        12       108        60
OIR    2025130    131400  -10.3400 -137.3600      34.1        11       107        60
OIR    2025130    131400  -10.3400 -137.3700      33.9        10       105        60
OIR    2025130    131400  -10.3400 -137.3800      33.6        10       104        60
OIR    2025130    131400  -10.3400 -137.3900      33.2         9       104        60
OIR    2025130    131400  -10.3400 -137.4000      32.7         8       104        60
OIR    2025130    131400  -10.3400 -137.4100      32.4         7       104        60
OIR    2025130    131400  -10.3400 -137.4200      32.3         6       108        60
OIR    2025130    131400  -10.3400 -137.4300      32.3         5       111        60
OIR    2025130    131400  -10.3400 -137.4400      32.2         5       109        60
OIR    2025130    131400  -10.3400 -137.4500      32.2         5       108        60
OIR    2025130    131400  -10.3400 -137.4600      32.1         5       108        60
OIR    2025130    131400  -10.3400 -137.4700      32.1         5       108        60
OIR    2025130    131400  -10.3400 -137.4800      32.0         5       108        60
OIR    2025130    131400  -10.3400 -137.4900      32.0         5       107        60
OIR    2025130    131400  -10.3400 -137.5000      31.9         5       105        60
OIR    2025130    131400  -10.3400 -137.5100      31.8         5       105        60
OIR    2025130    131400  -10.3400 -137.5200      31.8         5       105        60
OIR    2025130    131400  -10.3400 -137.5300      31.7         5       104        60
OIR    2025130    131400  -10.3400 -137.5400      31.6         5       104        60
OIR    2025130    131400  -10.3400 -137.5500      31.6         5       108        60
OIR    2025130    131400  -10.3400 -137.5600      31.6         5       111        60
OIR    2025130    131400  -10.3400 -137.5700      31.6         5       110        60
OIR    2025130    131400  -10.3400 -137.5800      31.6         5       109        60
OIR    2025130    131400  -10.3400 -137.5900      31.5         5       109        60
OIR    2025130    131400  -10.3400 -137.6000      31.5         5       109        60
OIR    2025130    131400  -10.3400 -137.6100      31.5         5       108        60
OIR    2025130    131400  -10.3400 -137.6200      31.5         5       107        60
OIR    2025130    131400  -10.3400 -137.6300      31.5         4       104        60
OIR    2025130    131400  -10.3400 -137.6400      31.5         4       104        60
OIR    2025130    131400  -10.3400 -137.6500      31.5         4       105        60
OIR    2025130    131400  -10.3400 -137.6600      31.4         5       108        60
OIR    2025130    131400  -10.3400 -137.6700      31.2         5       111        60
OIR    2025130    131400  -10.3400 -137.6800      31.1         4       113        60
OIR    2025130    131400  -10.3400 -137.6900      30.9         4       117        60
OIR    2025130    131400  -10.3400 -137.7000      30.8         4       123        60
OIR    2025130    131400  -10.3400 -137.7100      30.6         4       126        60
OIR    2025130    131400  -10.3400 -137.7200      30.1         3       128        60
OIR    2025130    131400  -10.3400 -137.7300      29.0         1       129        60
OIR    2025130    131400  -10.3400 -137.7400      28.1         1       131        60
OIR    2025130    131400  -10.3400 -137.7500      27.3         1       135        60
OIR    2025130    131400  -10.3400 -137.7600      25.6         0       138        60
OIR    2025130    131400  -10.3400 -137.7700      22.8       359       140        60
OIR    2025130    131400  -10.3400 -137.7800      21.0       358       141        60
OIR    2025130    131400  -10.3400 -137.7900      20.3       357       143        60
OIR    2025130    131400  -10.3400 -137.8000      20.1       357       143        60
OIR    2025130    131400  -10.3400 -137.8100      20.0       356       143        60
OIR    2025130    131400  -10.3400 -137.8200      19.9       356       142        60
OIR    2025130    131400  -10.3400 -137.8300      19.9       356       142        60
OIR    2025130    131400  -10.3400 -137.8400      19.9       356       141        60
OIR    2025130    131400  -10.3400 -137.8500      19.9       356       140        60
OIR    2025130    131400  -10.3400 -137.8600      20.0       355       139        60
OIR    2025130    131400  -10.3400 -137.8700      20.3       355       139        60
OIR    2025130    131400  -10.3400 -137.8800      20.7       355       138        60
OIR    2025130    131400  -10.3400 -137.8900      21.0       355       137        60
OIR    2025130    131400  -10.3400 -137.9000      21.2       354       135        60
OIR    2025130    131400  -10.3400 -137.9100      21.3       354       134        60
OIR    2025130    131400  -10.3400 -137.9200      21.5       354       134        60
OIR    2025130    131400  -10.3400 -137.9300      21.5       353       134        60
OIR    2025130    131400  -10.3400 -137.9400      21.6       353       132        60
OIR    2025130    131400  -10.3400 -137.9500      21.5       352       133        60
OIR    2025130    131400  -10.3400 -137.9600      21.4       352       134        60
OIR    2025130    131400  -10.3400 -137.9700      21.3       352       134        60
OIR    2025130    131400  -10.3400 -137.9800      21.6       352       135        60
OIR    2025130    131400  -10.3400 -137.9900      22.3       351       136        60
OIR    2025130    131400  -10.3400 -138.0000      23.2       351       137        60
OIR    2025130    131400  -10.3400 -138.0100      23.9       350       138        60
OIR    2025130    131400  -10.3400 -138.0200      24.5       349       138        60
OIR    2025130    131400  -10.3400 -138.0300      25.0       348       138        60
OIR    2025130    131400  -10.3400 -138.0400      25.4       348       138        60
OIR    2025130    131400  -10.3400 -138.0500      25.6       347       138        60
OIR    2025130    131400  -10.3400 -138.0600      25.7       347       137        60
OIR    2025130    131400  -10.3400 -138.0700      25.8       347       136        60
OIR    2025130    131400  -10.3400 -138.0800      25.8       347       137        60
OIR    2025130    131400  -10.3400 -138.0900      25.9       346       138        60
OIR    2025130    131400  -10.3400 -138.1000      26.0       346       138        60
OIR    2025130    131400  -10.3400 -138.1100      26.3       345       139        60
OIR    2025130    131400  -10.3400 -138.1200      26.7       344       140        60
OIR    2025130    131400  -10.3400 -138.1300      27.0       343       138        60
OIR    2025130    131400  -10.3400 -138.1400      27.3       343       135        60
OIR    2025130    131400  -10.3400 -138.1500      27.6       343       132        60
OIR    2025130    131400  -10.3400 -138.1600      27.8       343       130        60
OIR    2025130    131400  -10.3400 -138.1700      27.9       342       127        60
OIR    2025130    131400  -10.3400 -138.1800      28.1       342       124        60
OIR    2025130    131400  -10.3400 -138.1900      28.2       342       124        60
OIR    2025130    131400  -10.3400 -138.2000      28.4       343       124        60
OIR    2025130    131400  -10.3400 -138.2100      28.7       343       126        60
OIR    2025130    131400  -10.3400 -138.2200      29.1       342       128        60
OIR    2025130    131400  -10.3400 -138.2300      29.7       342       125        60
OIR    2025130    131400  -10.3400 -138.2400      30.3       342       124        60
OIR    2025130    131400  -10.3400 -138.2500      30.6       342       125        60
OIR    2025130    131400  -10.3400 -138.2600      30.7       342       127        60
OIR    2025130    131400  -10.3400 -138.2700      30.9       341       130        60
OIR    2025130    131400  -10.3400 -138.2800      31.0       341       133        60
OIR    2025130    131400  -10.3400 -138.2900      31.0       341       137        60
OIR    2025130    131400  -10.3400 -138.3000      31.3       341       142        60
OIR    2025130    131400  -10.3400 -138.3100      31.5       341       147        60
OIR    2025130    131400  -10.3400 -138.3200      31.5       341       147        60
OIR    2025130    131400  -10.3400 -138.3300      31.4       341       147        60
OIR    2025130    131400  -10.3400 -138.3400      31.1       341       142        60
OIR    2025130    131400  -10.3400 -138.3500      30.4       340       140        60
OIR    2025130    131400  -10.3400 -138.3600      29.3       340       139        60
OIR    2025130    131400  -10.3400 -138.3700      29.1       340       139        60
OIR    2025130    131400  -10.3400 -138.3800      29.0       340       138        60
OIR    2025130    131400  -10.3400 -138.3900      28.9       340       137        60
OIR    2025130    131400  -10.3400 -138.4000      28.9       340       137        60
OIR    2025130    131400  -10.3400 -138.4100      28.8       340       145        60
OIR    2025130    131400  -10.3500 -136.3100      42.9        43       147        60
OIR    2025130    131400  -10.3500 -136.3200      43.1        43       146        60
OIR    2025130    131400  -10.3500 -136.3300      43.2        43       146        60
OIR    2025130    131400  -10.3500 -136.3400      43.1        42       146        60
OIR    2025130    131400  -10.3500 -136.3500      43.0        42       146        60
OIR    2025130    131400  -10.3500 -136.3600      43.0        41       145        60
OIR    2025130    131400  -10.3500 -136.3700      42.8        41       144        60
OIR    2025130    131400  -10.3500 -136.3800      42.8        41       143        60
OIR    2025130    131400  -10.3500 -136.3900      42.7        41       142        60
OIR    2025130    131400  -10.3500 -136.4000      42.5        40       140        60
OIR    2025130    131400  -10.3500 -136.4100      42.4        40       140        60
OIR    2025130    131400  -10.3500 -136.4200      42.4        40       139        60
OIR    2025130    131400  -10.3500 -136.4300      42.4        40       138        60
OIR    2025130    131400  -10.3500 -136.4400      42.4        40       137        60
OIR    2025130    131400  -10.3500 -136.4500      42.4        40       135        60
OIR    2025130    131400  -10.3500 -136.4600      42.4        40       134        60
OIR    2025130    131400  -10.3500 -136.4700      42.4        40       134        60
OIR    2025130    131400  -10.3500 -136.4800      42.4        40       136        60
OIR    2025130    131400  -10.3500 -136.4900      42.4        40       138        60
OIR    2025130    131400  -10.3500 -136.5000      42.4        40       140        60
OIR    2025130    131400  -10.3500 -136.5100      42.4        40       142        60
OIR    2025130    131400  -10.3500 -136.5200      42.1        40       138        60
OIR    2025130    131400  -10.3500 -136.5300      42.1        40       135        60
OIR    2025130    131400  -10.3500 -136.5400      42.0        40       132        60
OIR    2025130    131400  -10.3500 -136.5500      41.9        40       130        60
OIR    2025130    131400  -10.3500 -136.5600      41.9        40       128        60
OIR    2025130    131400  -10.3500 -136.5700      41.9        39       129        60
OIR    2025130    131400  -10.3500 -136.5800      41.8        39       131        60
OIR    2025130    131400  -10.3500 -136.5900      41.7        39       131        60
OIR    2025130    131400  -10.3500 -136.6000      41.6        39       131        60
OIR    2025130    131400  -10.3500 -136.6100      41.4        39       129        60
OIR    2025130    131400  -10.3500 -136.6200      41.3        39       127        60
OIR    2025130    131400  -10.3500 -136.6300      41.3        39       125        60
OIR    2025130    131400  -10.3500 -136.6400      41.2        39       123        60
OIR    2025130    131400  -10.3500 -136.6500      41.0        39       125        60
OIR    2025130    131400  -10.3500 -136.6600      40.9        39       126        60
OIR    2025130    131400  -10.3500 -136.6700      40.8        39       125        60
OIR    2025130    131400  -10.3500 -136.6800      40.7        39       125        60
OIR    2025130    131400  -10.3500 -136.6900      40.5        39       125        60
OIR    2025130    131400  -10.3500 -136.7000      40.4        39       125        60
OIR    2025130    131400  -10.3500 -136.7100      40.3        39       125        60
OIR    2025130    131400  -10.3500 -136.7200      40.2        39       126        60
OIR    2025130    131400  -10.3500 -136.7300      40.1        39       126        60
OIR    2025130    131400  -10.3500 -136.7400      40.0        39       128        60
OIR    2025130    131400  -10.3500 -136.7500      40.0        39       129        60
OIR    2025130    131400  -10.3500 -136.7600      39.9        39       130        60
OIR    2025130    131400  -10.3500 -136.7700      39.7        39       129        60
OIR    2025130    131400  -10.3500 -136.7800      39.3        39       124        60
OIR    2025130    131400  -10.3500 -136.7900      39.0        38       121        60
OIR    2025130    131400  -10.3500 -136.8000      38.8        38       121        60
OIR    2025130    131400  -10.3500 -136.8100      38.7        38       121        60
OIR    2025130    131400  -10.3500 -136.8200      38.7        38       122        60
OIR    2025130    131400  -10.3500 -136.8300      39.0        36       123        60
OIR    2025130    131400  -10.3500 -136.8400      39.9        34       124        60
OIR    2025130    131400  -10.3500 -136.8500      40.8        32       126        60
OIR    2025130    131400  -10.3500 -136.8600      41.2        31       127        60
OIR    2025130    131400  -10.3500 -136.8700      41.4        31       130        60
OIR    2025130    131400  -10.3500 -136.8800      41.5        31       133        60
OIR    2025130    131400  -10.3500 -136.8900      41.5        31       133        60
OIR    2025130    131400  -10.3500 -136.9000      41.6        30       132        60
OIR    2025130    131400  -10.3500 -136.9100      41.6        30       131        60
OIR    2025130    131400  -10.3500 -136.9200      41.7        30       133        60
OIR    2025130    131400  -10.3500 -136.9300      41.7        30       139        60
OIR    2025130    131400  -10.3500 -136.9400      41.7        30       143        60
OIR    2025130    131400  -10.3500 -136.9500      41.7        30       145        60
OIR    2025130    131400  -10.3500 -136.9600      40.9        29       144        60
OIR    2025130    131400  -10.3500 -136.9700      40.3        28       142        60
OIR    2025130    131400  -10.3500 -136.9800      39.6        27       141        60
OIR    2025130    131400  -10.3500 -136.9900      39.2        25       139        60
OIR    2025130    131400  -10.3500 -137.0000      38.9        24       138        60
OIR    2025130    131400  -10.3500 -137.0100      38.1        22       134        60
OIR    2025130    131400  -10.3500 -137.0200      38.1        22       127        60
OIR    2025130    131400  -10.3500 -137.0300      38.1        22       122        60
OIR    2025130    131400  -10.3500 -137.0400      38.1        22       117        60
OIR    2025130    131400  -10.3500 -137.0500      38.1        22       116        60
OIR    2025130    131400  -10.3500 -137.0600      38.1        22       116        60
OIR    2025130    131400  -10.3500 -137.0700      38.1        22       116        60
OIR    2025130    131400  -10.3500 -137.0800      38.2        21       115        60
OIR    2025130    131400  -10.3500 -137.0900      38.5        21       122        60
OIR    2025130    131400  -10.3500 -137.1000      38.9        22       127        60
OIR    2025130    131400  -10.3500 -137.1100      38.9        21       126        60
OIR    2025130    131400  -10.3500 -137.1200      39.1        22       123        60
OIR    2025130    131400  -10.3500 -137.1300      39.2        22       116        60
OIR    2025130    131400  -10.3500 -137.1400      39.4        22       113        60
OIR    2025130    131400  -10.3500 -137.1500      38.8        20       112        60
OIR    2025130    131400  -10.3500 -137.1600      38.6        18       123        60
OIR    2025130    131400  -10.3500 -137.1700      38.3        17       135        60
OIR    2025130    131400  -10.3500 -137.1800      38.3        17       136        60
OIR    2025130    131400  -10.3500 -137.1900      37.9        16       137        60
OIR    2025130    131400  -10.3500 -137.2000      37.9        16       123        60
OIR    2025130    131400  -10.3500 -137.2100      37.9        16       111        60
OIR    2025130    131400  -10.3500 -137.2200      37.9        16       108        60
OIR    2025130    131400  -10.3500 -137.2300      37.9        16       105        60
OIR    2025130    131400  -10.3500 -137.2400      37.9        17       105        60
OIR    2025130    131400  -10.3500 -137.2500      37.9        17       105        60
OIR    2025130    131400  -10.3500 -137.2600      37.9        17       105        60
OIR    2025130    131400  -10.3500 -137.2700      37.8        17       107        60
OIR    2025130    131400  -10.3500 -137.2800      37.8        17       109        60
OIR    2025130    131400  -10.3500 -137.2900      37.7        17       111        60
OIR    2025130    131400  -10.3500 -137.3000      37.5        17       115        60
OIR    2025130    131400  -10.3500 -137.3100      36.9        16       113        60
OIR    2025130    131400  -10.3500 -137.3200      36.1        15       111        60
OIR    2025130    131400  -10.3500 -137.3300      35.4        14       109        60
OIR    2025130    131400  -10.3500 -137.3400      34.9        13       107        60
OIR    2025130    131400  -10.3500 -137.3500      34.6        12       107        60
OIR    2025130    131400  -10.3500 -137.3600      34.2        11       105        60
OIR    2025130    131400  -10.3500 -137.3700      33.8        10       105        60
OIR    2025130    131400  -10.3500 -137.3800      33.3         8       104        60
OIR    2025130    131400  -10.3500 -137.3900      32.8         7       104        60
OIR    2025130    131400  -10.3500 -137.4000      32.4         6       104        60
OIR    2025130    131400  -10.3500 -137.4100      32.3         5       107        60
OIR    2025130    131400  -10.3500 -137.4200      32.2         5       109        60
OIR    2025130    131400  -10.3500 -137.4300      32.2         5       108        60
OIR    2025130    131400  -10.3500 -137.4400      32.1         5       105        60
OIR    2025130    131400  -10.3500 -137.4500      32.1         5       104        60
OIR    2025130    131400  -10.3500 -137.4600      32.1         5       104        60
OIR    2025130    131400  -10.3500 -137.4700      32.0         5       104        60
OIR    2025130    131400  -10.3500 -137.4800      31.9         5       104        60
OIR    2025130    131400  -10.3500 -137.4900      31.9         5       104        60
OIR    2025130    131400  -10.3500 -137.5000      31.9         5       104        60
OIR    2025130    131400  -10.3500 -137.5100      31.8         5       105        60
OIR    2025130    131400  -10.3500 -137.5200      31.8         5       107        60
OIR    2025130    131400  -10.3500 -137.5300      31.7         5       108        60
OIR    2025130    131400  -10.3500 -137.5400      31.7         5       109        60
OIR    2025130    131400  -10.3500 -137.5500      31.7         5       111        60
OIR    2025130    131400  -10.3500 -137.5600      31.7         5       114        60
OIR    2025130    131400  -10.3500 -137.5700      31.6         5       114        60
OIR    2025130    131400  -10.3500 -137.5800      31.6         5       114        60
OIR    2025130    131400  -10.3500 -137.5900      31.6         5       113        60
OIR    2025130    131400  -10.3500 -137.6000      31.6         4       112        60
OIR    2025130    131400  -10.3500 -137.6100      31.6         4       111        60
OIR    2025130    131400  -10.3500 -137.6200      31.6         4       110        60
OIR    2025130    131400  -10.3500 -137.6300      31.6         4       108        60
OIR    2025130    131400  -10.3500 -137.6400      31.6         4       108        60
OIR    2025130    131400  -10.3500 -137.6500      31.5         4       109        60
OIR    2025130    131400  -10.3500 -137.6600      31.5         4       111        60
OIR    2025130    131400  -10.3500 -137.6700      31.4         5       113        60
OIR    2025130    131400  -10.3500 -137.6800      31.3         4       116        60
OIR    2025130    131400  -10.3500 -137.6900      31.2         4       121        60
OIR    2025130    131400  -10.3500 -137.7000      31.1         4       127        60
OIR    2025130    131400  -10.3500 -137.7100      30.9         4       128        60
OIR    2025130    131400  -10.3500 -137.7200      30.3         3       130        60
OIR    2025130    131400  -10.3500 -137.7300      29.3         2       132        60
OIR    2025130    131400  -10.3500 -137.7400      28.2         1       134        60
OIR    2025130    131400  -10.3500 -137.7500      27.2         1       137        60
OIR    2025130    131400  -10.3500 -137.7600      25.5         0       140        60
OIR    2025130    131400  -10.3500 -137.7700      22.5       358       143        60
OIR    2025130    131400  -10.3500 -137.7800      20.6       357       146        60
OIR    2025130    131400  -10.3500 -137.7900      20.1       357       148        60
OIR    2025130    131400  -10.3500 -137.8000      20.0       357       149        60
OIR    2025130    131400  -10.3500 -137.8100      19.9       356       148        60
OIR    2025130    131400  -10.3500 -137.8200      19.9       356       147        60
OIR    2025130    131400  -10.3500 -137.8300      19.8       356       146        60
OIR    2025130    131400  -10.3500 -137.8400      19.7       356       145        60
OIR    2025130    131400  -10.3500 -137.8500      19.7       356       143        60
OIR    2025130    131400  -10.3500 -137.8600      19.7       356       142        60
OIR    2025130    131400  -10.3500 -137.8700      19.8       355       141        60
OIR    2025130    131400  -10.3500 -137.8800      20.1       355       141        60
OIR    2025130    131400  -10.3500 -137.8900      20.4       355       141        60
OIR    2025130    131400  -10.3500 -137.9000      20.5       355       139        60
OIR    2025130    131400  -10.3500 -137.9100      20.5       354       137        60
OIR    2025130    131400  -10.3500 -137.9200      20.4       354       137        60
OIR    2025130    131400  -10.3500 -137.9300      20.2       354       136        60
OIR    2025130    131400  -10.3500 -137.9400      20.0       353       135        60
OIR    2025130    131400  -10.3500 -137.9500      20.0       353       134        60
OIR    2025130    131400  -10.3500 -137.9600      20.1       353       135        60
OIR    2025130    131400  -10.3500 -137.9700      20.3       353       135        60
OIR    2025130    131400  -10.3500 -137.9800      20.7       353       136        60
OIR    2025130    131400  -10.3500 -137.9900      21.7       352       137        60
OIR    2025130    131400  -10.3500 -138.0000      22.6       351       139        60
OIR    2025130    131400  -10.3500 -138.0100      23.5       351       140        60
OIR    2025130    131400  -10.3500 -138.0200      24.2       350       140        60
OIR    2025130    131400  -10.3500 -138.0300      24.8       349       140        60
OIR    2025130    131400  -10.3500 -138.0400      25.1       348       139        60
OIR    2025130    131400  -10.3500 -138.0500      25.4       348       138        60
OIR    2025130    131400  -10.3500 -138.0600      25.5       347       137        60
OIR    2025130    131400  -10.3500 -138.0700      25.6       347       135        60
OIR    2025130    131400  -10.3500 -138.0800      25.7       347       136        60
OIR    2025130    131400  -10.3500 -138.0900      25.7       347       137        60
OIR    2025130    131400  -10.3500 -138.1000      25.8       347       137        60
OIR    2025130    131400  -10.3500 -138.1100      26.0       346       137        60
OIR    2025130    131400  -10.3500 -138.1200      26.2       345       140        60
OIR    2025130    131400  -10.3500 -138.1300      26.5       344       140        60
OIR    2025130    131400  -10.3500 -138.1400      26.8       344       138        60
OIR    2025130    131400  -10.3500 -138.1500      27.2       343       135        60
OIR    2025130    131400  -10.3500 -138.1600      27.6       343       132        60
OIR    2025130    131400  -10.3500 -138.1700      27.8       343       128        60
OIR    2025130    131400  -10.3500 -138.1800      28.0       343       125        60
OIR    2025130    131400  -10.3500 -138.1900      28.2       343       124        60
OIR    2025130    131400  -10.3500 -138.2000      28.5       343       124        60
OIR    2025130    131400  -10.3500 -138.2100      28.8       343       125        60
OIR    2025130    131400  -10.3500 -138.2200      29.4       343       126        60
OIR    2025130    131400  -10.3500 -138.2300      30.1       342       123        60
OIR    2025130    131400  -10.3500 -138.2400      30.5       342       123        60
OIR    2025130    131400  -10.3500 -138.2500      30.7       342       125        60
OIR    2025130    131400  -10.3500 -138.2600      30.9       342       127        60
OIR    2025130    131400  -10.3500 -138.2700      31.0       342       129        60
OIR    2025130    131400  -10.3500 -138.2800      31.2       341       135        60
OIR    2025130    131400  -10.3500 -138.2900      31.4       341       141        60
OIR    2025130    131400  -10.3500 -138.3000      31.5       341       146        60
OIR    2025130    131400  -10.3500 -138.3200      31.5       341       147        60
OIR    2025130    131400  -10.3500 -138.3300      31.4       341       144        60
OIR    2025130    131400  -10.3500 -138.3400      31.3       341       140        60
OIR    2025130    131400  -10.3500 -138.3500      30.7       341       139        60
OIR    2025130    131400  -10.3500 -138.3600      29.4       341       138        60
OIR    2025130    131400  -10.3500 -138.3700      29.1       341       138        60
OIR    2025130    131400  -10.3500 -138.3800      29.0       341       139        60
OIR    2025130    131400  -10.3500 -138.3900      28.9       341       138        60
OIR    2025130    131400  -10.3500 -138.4000      28.8       341       139        60
OIR    2025130    131400  -10.3500 -138.4100      28.6       341       147        60
OIR    2025130    131400  -10.3600 -136.3000      42.1        42       148        60
OIR    2025130    131400  -10.3600 -136.3100      42.4        42       145        60
OIR    2025130    131400  -10.3600 -136.3200      42.6        42       146        60
OIR    2025130    131400  -10.3600 -136.3300      42.6        42       145        60
OIR    2025130    131400  -10.3600 -136.3400      42.5        41       144        60
OIR    2025130    131400  -10.3600 -136.3500      42.5        41       144        60
OIR    2025130    131400  -10.3600 -136.3600      42.6        41       143        60
OIR    2025130    131400  -10.3600 -136.3700      42.5        41       142        60
OIR    2025130    131400  -10.3600 -136.3800      42.5        40       142        60
OIR    2025130    131400  -10.3600 -136.3900      42.5        40       141        60
OIR    2025130    131400  -10.3600 -136.4000      42.4        40       141        60
OIR    2025130    131400  -10.3600 -136.4100      42.4        40       138        60
OIR    2025130    131400  -10.3600 -136.4200      42.4        40       136        60
OIR    2025130    131400  -10.3600 -136.4300      42.4        40       137        60
OIR    2025130    131400  -10.3600 -136.4400      42.4        40       137        60
OIR    2025130    131400  -10.3600 -136.4500      42.4        40       138        60
OIR    2025130    131400  -10.3600 -136.4600      42.4        40       137        60
OIR    2025130    131400  -10.3600 -136.4700      42.4        40       135        60
OIR    2025130    131400  -10.3600 -136.4800      42.4        40       137        60
OIR    2025130    131400  -10.3600 -136.4900      42.4        40       139        60
OIR    2025130    131400  -10.3600 -136.5000      42.4        40       140        60
OIR    2025130    131400  -10.3600 -136.5100      42.3        40       142        60
OIR    2025130    131400  -10.3600 -136.5200      42.1        40       139        60
OIR    2025130    131400  -10.3600 -136.5300      42.1        40       136        60
OIR    2025130    131400  -10.3600 -136.5400      42.0        40       132        60
OIR    2025130    131400  -10.3600 -136.5500      42.0        39       129        60
OIR    2025130    131400  -10.3600 -136.5600      41.9        39       128        60
OIR    2025130    131400  -10.3600 -136.5700      41.9        39       128        60
OIR    2025130    131400  -10.3600 -136.5800      41.8        39       129        60
OIR    2025130    131400  -10.3600 -136.5900      41.8        39       129        60
OIR    2025130    131400  -10.3600 -136.6000      41.7        39       129        60
OIR    2025130    131400  -10.3600 -136.6100      41.6        39       128        60
OIR    2025130    131400  -10.3600 -136.6200      41.5        39       127        60
OIR    2025130    131400  -10.3600 -136.6300      41.4        39       127        60
OIR    2025130    131400  -10.3600 -136.6400      41.3        39       126        60
OIR    2025130    131400  -10.3600 -136.6500      41.2        39       127        60
OIR    2025130    131400  -10.3600 -136.6600      41.0        39       127        60
OIR    2025130    131400  -10.3600 -136.6700      40.9        39       128        60
OIR    2025130    131400  -10.3600 -136.6800      40.8        39       129        60
OIR    2025130    131400  -10.3600 -136.6900      40.6        39       130        60
OIR    2025130    131400  -10.3600 -136.7000      40.4        39       130        60
OIR    2025130    131400  -10.3600 -136.7100      40.3        39       130        60
OIR    2025130    131400  -10.3600 -136.7200      40.3        39       131        60
OIR    2025130    131400  -10.3600 -136.7300      40.2        39       132        60
OIR    2025130    131400  -10.3600 -136.7400      40.2        39       132        60
OIR    2025130    131400  -10.3600 -136.7500      40.2        38       132        60
OIR    2025130    131400  -10.3600 -136.7600      40.2        38       132        60
OIR    2025130    131400  -10.3600 -136.7700      40.0        38       132        60
OIR    2025130    131400  -10.3600 -136.7800      39.5        38       129        60
OIR    2025130    131400  -10.3600 -136.7900      39.0        38       127        60
OIR    2025130    131400  -10.3600 -136.8000      38.8        38       125        60
OIR    2025130    131400  -10.3600 -136.8100      38.7        38       125        60
OIR    2025130    131400  -10.3600 -136.8200      38.7        37       127        60
OIR    2025130    131400  -10.3600 -136.8300      39.1        35       127        60
OIR    2025130    131400  -10.3600 -136.8400      39.9        33       126        60
OIR    2025130    131400  -10.3600 -136.8500      40.7        32       126        60
OIR    2025130    131400  -10.3600 -136.8600      41.0        31       126        60
OIR    2025130    131400  -10.3600 -136.8700      41.2        31       130        60
OIR    2025130    131400  -10.3600 -136.8800      41.4        31       133        60
OIR    2025130    131400  -10.3600 -136.8900      41.4        30       132        60
OIR    2025130    131400  -10.3600 -136.9000      41.5        30       130        60
OIR    2025130    131400  -10.3600 -136.9100      41.5        30       127        60
OIR    2025130    131400  -10.3600 -136.9200      41.6        30       127        60
OIR    2025130    131400  -10.3600 -136.9300      41.7        30       132        60
OIR    2025130    131400  -10.3600 -136.9400      41.7        30       136        60
OIR    2025130    131400  -10.3600 -136.9500      41.7        29       139        60
OIR    2025130    131400  -10.3600 -136.9600      40.8        28       139        60
OIR    2025130    131400  -10.3600 -136.9700      40.2        27       139        60
OIR    2025130    131400  -10.3600 -136.9800      39.7        26       142        60
OIR    2025130    131400  -10.3600 -136.9900      39.3        25       144        60
OIR    2025130    131400  -10.3600 -137.0000      38.8        24       141        60
OIR    2025130    131400  -10.3600 -137.0100      38.1        22       135        60
OIR    2025130    131400  -10.3600 -137.0200      38.1        22       129        60
OIR    2025130    131400  -10.3600 -137.0300      38.1        22       124        60
OIR    2025130    131400  -10.3600 -137.0400      38.1        22       122        60
OIR    2025130    131400  -10.3600 -137.0500      38.1        22       120        60
OIR    2025130    131400  -10.3600 -137.0600      38.1        22       117        60
OIR    2025130    131400  -10.3600 -137.0700      38.2        21       116        60
OIR    2025130    131400  -10.3600 -137.0800      38.3        21       116        60
OIR    2025130    131400  -10.3600 -137.0900      38.4        21       124        60
OIR    2025130    131400  -10.3600 -137.1000      38.7        21       129        60
OIR    2025130    131400  -10.3600 -137.1100      38.9        21       129        60
OIR    2025130    131400  -10.3600 -137.1200      39.1        21       125        60
OIR    2025130    131400  -10.3600 -137.1300      39.4        21       120        60
OIR    2025130    131400  -10.3600 -137.1400      39.2        21       116        60
OIR    2025130    131400  -10.3600 -137.1500      38.7        19       113        60
OIR    2025130    131400  -10.3600 -137.1600      38.6        18       123        60
OIR    2025130    131400  -10.3600 -137.1700      38.5        17       135        60
OIR    2025130    131400  -10.3600 -137.1800      38.4        17       136        60
OIR    2025130    131400  -10.3600 -137.1900      38.0        16       137        60
OIR    2025130    131400  -10.3600 -137.2000      37.9        16       122        60
OIR    2025130    131400  -10.3600 -137.2100      37.9        16       111        60
OIR    2025130    131400  -10.3600 -137.2200      37.9        16       108        60
OIR    2025130    131400  -10.3600 -137.2300      37.9        16       107        60
OIR    2025130    131400  -10.3600 -137.2400      37.8        17       107        60
OIR    2025130    131400  -10.3600 -137.2500      37.8        17       105        60
OIR    2025130    131400  -10.3600 -137.2600      37.8        17       104        60
OIR    2025130    131400  -10.3600 -137.2700      37.8        17       104        60
OIR    2025130    131400  -10.3600 -137.2800      37.8        17       107        60
OIR    2025130    131400  -10.3600 -137.2900      37.6        17       110        60
OIR    2025130    131400  -10.3600 -137.3000      37.2        16       114        60
OIR    2025130    131400  -10.3600 -137.3100      36.5        16       113        60
OIR    2025130    131400  -10.3600 -137.3200      35.7        15       111        60
OIR    2025130    131400  -10.3600 -137.3300      35.1        13       109        60
OIR    2025130    131400  -10.3600 -137.3400      34.8        13       105        60
OIR    2025130    131400  -10.3600 -137.3500      34.6        12       105        60
OIR    2025130    131400  -10.3600 -137.3600      34.3        11       105        60
OIR    2025130    131400  -10.3600 -137.3700      33.7         9       105        60
OIR    2025130    131400  -10.3600 -137.3800      33.0         7       104        60
OIR    2025130    131400  -10.3600 -137.3900      32.5         6       104        60
OIR    2025130    131400  -10.3600 -137.4000      32.2         5       105        60
OIR    2025130    131400  -10.3600 -137.4100      32.1         5       109        60
OIR    2025130    131400  -10.3600 -137.4200      32.1         5       108        60
OIR    2025130    131400  -10.3600 -137.4300      32.1         5       105        60
OIR    2025130    131400  -10.3600 -137.4400      32.1         5       104        60
OIR    2025130    131400  -10.3600 -137.4500      32.0         5       103        60
OIR    2025130    131400  -10.3600 -137.4600      32.0         5       104        60
OIR    2025130    131400  -10.3600 -137.4700      31.9         5       104        60
OIR    2025130    131400  -10.3600 -137.4800      31.9         5       104        60
OIR    2025130    131400  -10.3600 -137.4900      31.9         5       104        60
OIR    2025130    131400  -10.3600 -137.5000      31.8         5       104        60
OIR    2025130    131400  -10.3600 -137.5100      31.8         5       105        60
OIR    2025130    131400  -10.3600 -137.5200      31.8         5       108        60
OIR    2025130    131400  -10.3600 -137.5300      31.8         5       109        60
OIR    2025130    131400  -10.3600 -137.5400      31.7         5       111        60
OIR    2025130    131400  -10.3600 -137.5500      31.7         5       113        60
OIR    2025130    131400  -10.3600 -137.5600      31.7         5       115        60
OIR    2025130    131400  -10.3600 -137.5700      31.7         5       116        60
OIR    2025130    131400  -10.3600 -137.5800      31.7         4       116        60
OIR    2025130    131400  -10.3600 -137.5900      31.6         4       115        60
OIR    2025130    131400  -10.3600 -137.6000      31.6         4       114        60
OIR    2025130    131400  -10.3600 -137.6100      31.6         4       113        60
OIR    2025130    131400  -10.3600 -137.6200      31.6         4       112        60
OIR    2025130    131400  -10.3600 -137.6300      31.6         4       112        60
OIR    2025130    131400  -10.3600 -137.6400      31.6         4       112        60
OIR    2025130    131400  -10.3600 -137.6500      31.6         4       112        60
OIR    2025130    131400  -10.3600 -137.6600      31.5         4       114        60
OIR    2025130    131400  -10.3600 -137.6700      31.4         4       116        60
OIR    2025130    131400  -10.3600 -137.6800      31.4         4       120        60
OIR    2025130    131400  -10.3600 -137.6900      31.3         4       124        60
OIR    2025130    131400  -10.3600 -137.7000      31.2         4       129        60
OIR    2025130    131400  -10.3600 -137.7100      31.0         4       131        60
OIR    2025130    131400  -10.3600 -137.7200      30.6         3       132        60
OIR    2025130    131400  -10.3600 -137.7300      29.4         2       135        60
OIR    2025130    131400  -10.3600 -137.7400      28.1         1       138        60
OIR    2025130    131400  -10.3600 -137.7500      26.9         0       140        60
OIR    2025130    131400  -10.3600 -137.7600      25.1       360       142        60
OIR    2025130    131400  -10.3600 -137.7700      22.1       358       144        60
OIR    2025130    131400  -10.3600 -137.7800      20.4       357       147        60
OIR    2025130    131400  -10.3600 -137.7900      20.0       357       149        60
OIR    2025130    131400  -10.3600 -137.8000      19.9       357       151        60
OIR    2025130    131400  -10.3600 -137.8100      19.9       357       150        60
OIR    2025130    131400  -10.3600 -137.8200      19.9       356       149        60
OIR    2025130    131400  -10.3600 -137.8300      19.7       356       147        60
OIR    2025130    131400  -10.3600 -137.8400      19.6       356       146        60
OIR    2025130    131400  -10.3600 -137.8500      19.6       356       144        60
OIR    2025130    131400  -10.3600 -137.8600      19.5       356       144        60
OIR    2025130    131400  -10.3600 -137.8700      19.5       356       144        60
OIR    2025130    131400  -10.3600 -137.8800      19.6       356       144        60
OIR    2025130    131400  -10.3600 -137.8900      19.6       355       144        60
OIR    2025130    131400  -10.3600 -137.9000      19.4       355       141        60
OIR    2025130    131400  -10.3600 -137.9100      19.0       355       140        60
OIR    2025130    131400  -10.3600 -137.9200      18.8       355       139        60
OIR    2025130    131400  -10.3600 -137.9300      18.6       355       138        60
OIR    2025130    131400  -10.3600 -137.9400      18.6       355       137        60
OIR    2025130    131400  -10.3600 -137.9500      18.7       354       136        60
OIR    2025130    131400  -10.3600 -137.9600      18.9       354       135        60
OIR    2025130    131400  -10.3600 -137.9700      19.2       354       137        60
OIR    2025130    131400  -10.3600 -137.9800      19.8       354       139        60
OIR    2025130    131400  -10.3600 -137.9900      20.6       353       140        60
OIR    2025130    131400  -10.3600 -138.0000      21.9       352       141        60
OIR    2025130    131400  -10.3600 -138.0100      23.1       351       142        60
OIR    2025130    131400  -10.3600 -138.0200      24.0       350       142        60
OIR    2025130    131400  -10.3600 -138.0300      24.5       349       141        60
OIR    2025130    131400  -10.3600 -138.0400      24.9       348       139        60
OIR    2025130    131400  -10.3600 -138.0500      25.1       348       138        60
OIR    2025130    131400  -10.3600 -138.0600      25.3       348       137        60
OIR    2025130    131400  -10.3600 -138.0700      25.4       347       135        60
OIR    2025130    131400  -10.3600 -138.0800      25.5       347       136        60
OIR    2025130    131400  -10.3600 -138.0900      25.6       347       136        60
OIR    2025130    131400  -10.3600 -138.1000      25.7       347       136        60
OIR    2025130    131400  -10.3600 -138.1100      25.7       347       137        60
OIR    2025130    131400  -10.3600 -138.1200      25.8       347       140        60
OIR    2025130    131400  -10.3600 -138.1300      26.1       346       140        60
OIR    2025130    131400  -10.3600 -138.1400      26.4       345       138        60
OIR    2025130    131400  -10.3600 -138.1500      26.9       344       135        60
OIR    2025130    131400  -10.3600 -138.1600      27.3       343       132        60
OIR    2025130    131400  -10.3600 -138.1700      27.7       343       129        60
OIR    2025130    131400  -10.3600 -138.1800      28.0       343       125        60
OIR    2025130    131400  -10.3600 -138.1900      28.2       343       125        60
OIR    2025130    131400  -10.3600 -138.2000      28.5       343       125        60
OIR    2025130    131400  -10.3600 -138.2100      28.9       343       125        60
OIR    2025130    131400  -10.3600 -138.2200      29.5       343       124        60
OIR    2025130    131400  -10.3600 -138.2300      30.2       343       123        60
OIR    2025130    131400  -10.3600 -138.2400      30.6       342       123        60
OIR    2025130    131400  -10.3600 -138.2500      30.8       342       125        60
OIR    2025130    131400  -10.3600 -138.2600      31.0       342       127        60
OIR    2025130    131400  -10.3600 -138.2700      31.1       342       131        60
OIR    2025130    131400  -10.3600 -138.2800      31.5       341       138        60
OIR    2025130    131400  -10.3600 -138.2900      31.6       341       145        60
OIR    2025130    131400  -10.3600 -138.3000      31.6       341       147        60
OIR    2025130    131400  -10.3600 -138.3100      31.6       341       149        60
OIR    2025130    131400  -10.3600 -138.3200      31.5       341       145        60
OIR    2025130    131400  -10.3600 -138.3300      31.4       341       141        60
OIR    2025130    131400  -10.3600 -138.3400      31.3       341       139        60
OIR    2025130    131400  -10.3600 -138.3500      30.6       341       138        60
OIR    2025130    131400  -10.3600 -138.3600      29.5       342       138        60
OIR    2025130    131400  -10.3600 -138.3700      29.1       342       139        60
OIR    2025130    131400  -10.3600 -138.3800      28.9       341       140        60
OIR    2025130    131400  -10.3600 -138.3900      28.7       342       141        60
OIR    2025130    131400  -10.3600 -138.4000      28.5       342       143        60
OIR    2025130    131400  -10.3700 -136.3100      42.0        42       146        60
OIR    2025130    131400  -10.3700 -136.3200      42.2        41       146        60
OIR    2025130    131400  -10.3700 -136.3300      42.2        41       145        60
OIR    2025130    131400  -10.3700 -136.3400      42.2        41       143        60
OIR    2025130    131400  -10.3700 -136.3500      42.3        41       141        60
OIR    2025130    131400  -10.3700 -136.3600      42.4        41       139        60
OIR    2025130    131400  -10.3700 -136.3700      42.4        40       138        60
OIR    2025130    131400  -10.3700 -136.3800      42.4        40       137        60
OIR    2025130    131400  -10.3700 -136.3900      42.4        40       138        60
OIR    2025130    131400  -10.3700 -136.4000      42.4        40       139        60
OIR    2025130    131400  -10.3700 -136.4100      42.4        40       135        60
OIR    2025130    131400  -10.3700 -136.4200      42.4        40       133        60
OIR    2025130    131400  -10.3700 -136.4300      42.4        40       134        60
OIR    2025130    131400  -10.3700 -136.4400      42.4        40       134        60
OIR    2025130    131400  -10.3700 -136.4500      42.4        40       136        60
OIR    2025130    131400  -10.3700 -136.4600      42.4        40       137        60
OIR    2025130    131400  -10.3700 -136.4700      42.4        40       137        60
OIR    2025130    131400  -10.3700 -136.4800      42.4        40       137        60
OIR    2025130    131400  -10.3700 -136.4900      42.4        40       138        60
OIR    2025130    131400  -10.3700 -136.5000      42.4        40       138        60
OIR    2025130    131400  -10.3700 -136.5100      42.3        40       138        60
OIR    2025130    131400  -10.3700 -136.5200      42.2        40       138        60
OIR    2025130    131400  -10.3700 -136.5300      42.1        40       136        60
OIR    2025130    131400  -10.3700 -136.5400      42.0        39       133        60
OIR    2025130    131400  -10.3700 -136.5500      42.0        39       130        60
OIR    2025130    131400  -10.3700 -136.5600      41.9        39       129        60
OIR    2025130    131400  -10.3700 -136.5700      41.9        39       129        60
OIR    2025130    131400  -10.3700 -136.5800      41.9        39       130        60
OIR    2025130    131400  -10.3700 -136.5900      41.8        39       131        60
OIR    2025130    131400  -10.3700 -136.6000      41.8        39       133        60
OIR    2025130    131400  -10.3700 -136.6100      41.7        39       132        60
OIR    2025130    131400  -10.3700 -136.6200      41.6        39       130        60
OIR    2025130    131400  -10.3700 -136.6300      41.5        39       130        60
OIR    2025130    131400  -10.3700 -136.6400      41.4        39       130        60
OIR    2025130    131400  -10.3700 -136.6500      41.3        39       129        60
OIR    2025130    131400  -10.3700 -136.6600      41.2        39       129        60
OIR    2025130    131400  -10.3700 -136.6700      41.1        39       128        60
OIR    2025130    131400  -10.3700 -136.6800      41.0        39       130        60
OIR    2025130    131400  -10.3700 -136.6900      40.8        39       134        60
OIR    2025130    131400  -10.3700 -136.7000      40.6        39       136        60
OIR    2025130    131400  -10.3700 -136.7100      40.4        39       137        60
OIR    2025130    131400  -10.3700 -136.7200      40.3        39       138        60
OIR    2025130    131400  -10.3700 -136.7300      40.3        39       137        60
OIR    2025130    131400  -10.3700 -136.7400      40.4        38       133        60
OIR    2025130    131400  -10.3700 -136.7500      40.4        38       131        60
OIR    2025130    131400  -10.3700 -136.7600      40.3        38       131        60
OIR    2025130    131400  -10.3700 -136.7700      40.1        38       131        60
OIR    2025130    131400  -10.3700 -136.7800      39.8        38       133        60
OIR    2025130    131400  -10.3700 -136.7900      39.0        38       133        60
OIR    2025130    131400  -10.3700 -136.8000      38.8        38       133        60
OIR    2025130    131400  -10.3700 -136.8100      38.8        37       133        60
OIR    2025130    131400  -10.3700 -136.8200      38.9        36       132        60
OIR    2025130    131400  -10.3700 -136.8300      39.5        34       130        60
OIR    2025130    131400  -10.3700 -136.8400      40.3        33       129        60
OIR    2025130    131400  -10.3700 -136.8500      40.8        32       130        60
OIR    2025130    131400  -10.3700 -136.8600      41.0        31       131        60
OIR    2025130    131400  -10.3700 -136.8700      41.1        31       133        60
OIR    2025130    131400  -10.3700 -136.8800      41.2        30       134        60
OIR    2025130    131400  -10.3700 -136.8900      41.3        30       133        60
OIR    2025130    131400  -10.3700 -136.9000      41.4        30       131        60
OIR    2025130    131400  -10.3700 -136.9100      41.4        30       127        60
OIR    2025130    131400  -10.3700 -136.9200      41.5        30       126        60
OIR    2025130    131400  -10.3700 -136.9300      41.6        30       128        60
OIR    2025130    131400  -10.3700 -136.9400      41.6        30       133        60
OIR    2025130    131400  -10.3700 -136.9500      41.5        29       137        60
OIR    2025130    131400  -10.3700 -136.9600      40.6        28       138        60
OIR    2025130    131400  -10.3700 -136.9700      40.1        27       140        60
OIR    2025130    131400  -10.3700 -136.9800      39.8        26       142        60
OIR    2025130    131400  -10.3700 -136.9900      39.4        26       141        60
OIR    2025130    131400  -10.3700 -137.0000      38.6        23       133        60
OIR    2025130    131400  -10.3700 -137.0100      38.2        22       128        60
OIR    2025130    131400  -10.3700 -137.0200      38.1        22       124        60
OIR    2025130    131400  -10.3700 -137.0300      38.1        22       123        60
OIR    2025130    131400  -10.3700 -137.0400      38.1        22       126        60
OIR    2025130    131400  -10.3700 -137.0500      38.1        21       123        60
OIR    2025130    131400  -10.3700 -137.0600      38.1        21       119        60
OIR    2025130    131400  -10.3700 -137.0700      38.2        21       120        60
OIR    2025130    131400  -10.3700 -137.0800      38.3        21       121        60
OIR    2025130    131400  -10.3700 -137.0900      38.4        21       124        60
OIR    2025130    131400  -10.3700 -137.1000      38.7        21       126        60
OIR    2025130    131400  -10.3700 -137.1100      38.8        20       121        60
OIR    2025130    131400  -10.3700 -137.1200      39.0        20       116        60
OIR    2025130    131400  -10.3700 -137.1300      39.1        20       112        60
OIR    2025130    131400  -10.3700 -137.1400      39.1        19       112        60
OIR    2025130    131400  -10.3700 -137.1500      38.8        19       116        60
OIR    2025130    131400  -10.3700 -137.1600      38.7        18       124        60
OIR    2025130    131400  -10.3700 -137.1700      38.6        17       131        60
OIR    2025130    131400  -10.3700 -137.1800      38.6        17       129        60
OIR    2025130    131400  -10.3700 -137.1900      38.4        17       126        60
OIR    2025130    131400  -10.3700 -137.2000      38.2        16       116        60
OIR    2025130    131400  -10.3700 -137.2100      38.1        16       111        60
OIR    2025130    131400  -10.3700 -137.2200      38.0        16       111        60
OIR    2025130    131400  -10.3700 -137.2300      37.9        16       111        60
OIR    2025130    131400  -10.3700 -137.2400      37.8        17       109        60
OIR    2025130    131400  -10.3700 -137.2500      37.8        17       107        60
OIR    2025130    131400  -10.3700 -137.2600      37.8        17       104        60
OIR    2025130    131400  -10.3700 -137.2700      37.8        17       104        60
OIR    2025130    131400  -10.3700 -137.2800      37.7        17       105        60
OIR    2025130    131400  -10.3700 -137.2900      37.3        16       110        60
OIR    2025130    131400  -10.3700 -137.3000      36.6        16       114        60
OIR    2025130    131400  -10.3700 -137.3100      35.9        15       113        60
OIR    2025130    131400  -10.3700 -137.3200      35.2        14       112        60
OIR    2025130    131400  -10.3700 -137.3300      34.9        13       110        60
OIR    2025130    131400  -10.3700 -137.3400      34.7        12       108        60
OIR    2025130    131400  -10.3700 -137.3500      34.6        12       107        60
OIR    2025130    131400  -10.3700 -137.3600      34.4        11       105        60
OIR    2025130    131400  -10.3700 -137.3700      33.5         8       104        60
OIR    2025130    131400  -10.3700 -137.3800      32.7         6       104        60
OIR    2025130    131400  -10.3700 -137.3900      32.3         5       104        60
OIR    2025130    131400  -10.3700 -137.4000      32.1         5       104        60
OIR    2025130    131400  -10.3700 -137.4100      32.0         5       107        60
OIR    2025130    131400  -10.3700 -137.4200      32.0         5       105        60
OIR    2025130    131400  -10.3700 -137.4300      32.0         5       104        60
OIR    2025130    131400  -10.3700 -137.4400      32.0         5       104        60
OIR    2025130    131400  -10.3700 -137.4500      31.9         5       103        60
OIR    2025130    131400  -10.3700 -137.4600      31.9         5       104        60
OIR    2025130    131400  -10.3700 -137.4700      31.9         5       104        60
OIR    2025130    131400  -10.3700 -137.4800      31.9         5       104        60
OIR    2025130    131400  -10.3700 -137.4900      31.8         5       104        60
OIR    2025130    131400  -10.3700 -137.5000      31.8         5       105        60
OIR    2025130    131400  -10.3700 -137.5100      31.8         5       107        60
OIR    2025130    131400  -10.3700 -137.5200      31.8         5       108        60
OIR    2025130    131400  -10.3700 -137.5300      31.8         5       109        60
OIR    2025130    131400  -10.3700 -137.5400      31.7         5       111        60
OIR    2025130    131400  -10.3700 -137.5500      31.7         4       114        60
OIR    2025130    131400  -10.3700 -137.5600      31.7         4       116        60
OIR    2025130    131400  -10.3700 -137.5700      31.7         4       116        60
OIR    2025130    131400  -10.3700 -137.5800      31.7         4       116        60
OIR    2025130    131400  -10.3700 -137.5900      31.6         4       116        60
OIR    2025130    131400  -10.3700 -137.6000      31.6         4       116        60
OIR    2025130    131400  -10.3700 -137.6100      31.6         4       115        60
OIR    2025130    131400  -10.3700 -137.6200      31.6         4       115        60
OIR    2025130    131400  -10.3700 -137.6300      31.6         4       114        60
OIR    2025130    131400  -10.3700 -137.6400      31.6         4       116        60
OIR    2025130    131400  -10.3700 -137.6500      31.6         4       116        60
OIR    2025130    131400  -10.3700 -137.6600      31.5         4       117        60
OIR    2025130    131400  -10.3700 -137.6700      31.5         4       120        60
OIR    2025130    131400  -10.3700 -137.6800      31.4         4       124        60
OIR    2025130    131400  -10.3700 -137.6900      31.4         4       128        60
OIR    2025130    131400  -10.3700 -137.7000      31.3         4       131        60
OIR    2025130    131400  -10.3700 -137.7100      31.2         4       133        60
OIR    2025130    131400  -10.3700 -137.7200      30.7         3       135        60
OIR    2025130    131400  -10.3700 -137.7300      29.5         2       138        60
OIR    2025130    131400  -10.3700 -137.7400      27.8         1       142        60
OIR    2025130    131400  -10.3700 -137.7500      26.2         0       142        60
OIR    2025130    131400  -10.3700 -137.7600      24.1       359       142        60
OIR    2025130    131400  -10.3700 -137.7700      21.5       358       143        60
OIR    2025130    131400  -10.3700 -137.7800      20.3       357       145        60
OIR    2025130    131400  -10.3700 -137.7900      20.0       357       148        60
OIR    2025130    131400  -10.3700 -137.8000      19.9       357       150        60
OIR    2025130    131400  -10.3700 -137.8100      19.9       357       149        60
OIR    2025130    131400  -10.3700 -137.8200      19.8       356       148        60
OIR    2025130    131400  -10.3700 -137.8300      19.7       356       146        60
OIR    2025130    131400  -10.3700 -137.8400      19.5       356       145        60
OIR    2025130    131400  -10.3700 -137.8500      19.5       356       145        60
OIR    2025130    131400  -10.3700 -137.8600      19.4       356       146        60
OIR    2025130    131400  -10.3700 -137.8700      19.4       356       147        60
OIR    2025130    131400  -10.3700 -137.8800      19.4       356       147        60
OIR    2025130    131400  -10.3700 -137.8900      19.1       355       147        60
OIR    2025130    131400  -10.3700 -137.9000      18.6       355       143        60
OIR    2025130    131400  -10.3700 -137.9100      18.4       355       142        60
OIR    2025130    131400  -10.3700 -137.9200      18.2       355       141        60
OIR    2025130    131400  -10.3700 -137.9300      18.2       355       141        60
OIR    2025130    131400  -10.3700 -137.9400      18.2       355       140        60
OIR    2025130    131400  -10.3700 -137.9500      18.3       355       138        60
OIR    2025130    131400  -10.3700 -137.9600      18.4       355       137        60
OIR    2025130    131400  -10.3700 -137.9700      18.6       355       141        60
OIR    2025130    131400  -10.3700 -137.9800      19.0       355       143        60
OIR    2025130    131400  -10.3700 -137.9900      19.6       355       144        60
OIR    2025130    131400  -10.3700 -138.0000      20.9       354       144        60
OIR    2025130    131400  -10.3700 -138.0100      22.6       352       146        60
OIR    2025130    131400  -10.3700 -138.0200      23.6       350       144        60
OIR    2025130    131400  -10.3700 -138.0300      24.2       350       141        60
OIR    2025130    131400  -10.3700 -138.0400      24.6       349       139        60
OIR    2025130    131400  -10.3700 -138.0500      24.9       348       138        60
OIR    2025130    131400  -10.3700 -138.0600      25.1       348       137        60
OIR    2025130    131400  -10.3700 -138.0700      25.3       347       136        60
OIR    2025130    131400  -10.3700 -138.0800      25.4       347       136        60
OIR    2025130    131400  -10.3700 -138.0900      25.5       347       136        60
OIR    2025130    131400  -10.3700 -138.1000      25.5       347       136        60
OIR    2025130    131400  -10.3700 -138.1100      25.5       347       137        60
OIR    2025130    131400  -10.3700 -138.1200      25.5       347       138        60
OIR    2025130    131400  -10.3700 -138.1300      25.6       347       137        60
OIR    2025130    131400  -10.3700 -138.1400      26.0       346       135        60
OIR    2025130    131400  -10.3700 -138.1500      26.5       345       133        60
OIR    2025130    131400  -10.3700 -138.1600      27.2       344       132        60
OIR    2025130    131400  -10.3700 -138.1700      27.6       344       129        60
OIR    2025130    131400  -10.3700 -138.1800      27.9       344       126        60
OIR    2025130    131400  -10.3700 -138.1900      28.2       344       126        60
OIR    2025130    131400  -10.3700 -138.2000      28.5       344       126        60
OIR    2025130    131400  -10.3700 -138.2100      28.9       344       124        60
OIR    2025130    131400  -10.3700 -138.2200      29.7       344       123        60
OIR    2025130    131400  -10.3700 -138.2300      30.2       343       124        60
OIR    2025130    131400  -10.3700 -138.2400      30.5       343       125        60
OIR    2025130    131400  -10.3700 -138.2500      30.8       342       126        60
OIR    2025130    131400  -10.3700 -138.2600      31.1       342       129        60
OIR    2025130    131400  -10.3700 -138.2700      31.3       342       137        60
OIR    2025130    131400  -10.3700 -138.2800      31.6       341       143        60
OIR    2025130    131400  -10.3700 -138.2900      31.6       341       149        60
OIR    2025130    131400  -10.3700 -138.3000      31.6       341       147        60
OIR    2025130    131400  -10.3700 -138.3100      31.6       341       145        60
OIR    2025130    131400  -10.3700 -138.3200      31.5       341       141        60
OIR    2025130    131400  -10.3700 -138.3300      31.4       341       138        60
OIR    2025130    131400  -10.3700 -138.3400      31.2       342       138        60
OIR    2025130    131400  -10.3700 -138.3500      30.5       342       138        60
OIR    2025130    131400  -10.3700 -138.3600      29.6       343       138        60
OIR    2025130    131400  -10.3700 -138.3700      29.1       343       140        60
OIR    2025130    131400  -10.3700 -138.3800      28.6       343       143        60
OIR    2025130    131400  -10.3700 -138.3900      28.1       344       147        60
OIR    2025130    131400  -10.3800 -136.3100      41.8        41       147        60
OIR    2025130    131400  -10.3800 -136.3200      41.9        41       146        60
OIR    2025130    131400  -10.3800 -136.3300      42.0        41       144        60
OIR    2025130    131400  -10.3800 -136.3400      42.1        41       141        60
OIR    2025130    131400  -10.3800 -136.3500      42.2        41       139        60
OIR    2025130    131400  -10.3800 -136.3600      42.2        40       137        60
OIR    2025130    131400  -10.3800 -136.3700      42.3        40       135        60
OIR    2025130    131400  -10.3800 -136.3800      42.3        40       134        60
OIR    2025130    131400  -10.3800 -136.3900      42.3        40       136        60
OIR    2025130    131400  -10.3800 -136.4000      42.3        40       138        60
OIR    2025130    131400  -10.3800 -136.4100      42.3        40       134        60
OIR    2025130    131400  -10.3800 -136.4200      42.3        40       131        60
OIR    2025130    131400  -10.3800 -136.4300      42.4        40       131        60
OIR    2025130    131400  -10.3800 -136.4400      42.4        40       132        60
OIR    2025130    131400  -10.3800 -136.4500      42.4        40       136        60
OIR    2025130    131400  -10.3800 -136.4600      42.4        40       137        60
OIR    2025130    131400  -10.3800 -136.4700      42.4        40       138        60
OIR    2025130    131400  -10.3800 -136.4800      42.4        40       137        60
OIR    2025130    131400  -10.3800 -136.4900      42.4        40       136        60
OIR    2025130    131400  -10.3800 -136.5000      42.3        40       136        60
OIR    2025130    131400  -10.3800 -136.5100      42.3        40       135        60
OIR    2025130    131400  -10.3800 -136.5200      42.2        40       136        60
OIR    2025130    131400  -10.3800 -136.5300      42.1        39       135        60
OIR    2025130    131400  -10.3800 -136.5400      42.1        39       133        60
OIR    2025130    131400  -10.3800 -136.5500      42.0        39       131        60
OIR    2025130    131400  -10.3800 -136.5600      42.0        39       131        60
OIR    2025130    131400  -10.3800 -136.5700      41.9        39       131        60
OIR    2025130    131400  -10.3800 -136.5800      41.9        39       132        60
OIR    2025130    131400  -10.3800 -136.5900      41.9        39       134        60
OIR    2025130    131400  -10.3800 -136.6000      41.8        39       137        60
OIR    2025130    131400  -10.3800 -136.6100      41.7        39       136        60
OIR    2025130    131400  -10.3800 -136.6200      41.6        39       133        60
OIR    2025130    131400  -10.3800 -136.6300      41.5        39       134        60
OIR    2025130    131400  -10.3800 -136.6400      41.5        39       133        60
OIR    2025130    131400  -10.3800 -136.6500      41.4        39       132        60
OIR    2025130    131400  -10.3800 -136.6600      41.3        39       130        60
OIR    2025130    131400  -10.3800 -136.6700      41.2        39       130        60
OIR    2025130    131400  -10.3800 -136.6800      41.2        39       133        60
OIR    2025130    131400  -10.3800 -136.6900      41.1        39       138        60
OIR    2025130    131400  -10.3800 -136.7000      41.0        38       140        60
OIR    2025130    131400  -10.3800 -136.7100      40.9        38       142        60
OIR    2025130    131400  -10.3800 -136.7200      40.8        38       143        60
OIR    2025130    131400  -10.3800 -136.7300      40.7        38       141        60
OIR    2025130    131400  -10.3800 -136.7400      40.6        38       134        60
OIR    2025130    131400  -10.3800 -136.7500      40.5        38       130        60
OIR    2025130    131400  -10.3800 -136.7600      40.4        38       130        60
OIR    2025130    131400  -10.3800 -136.7700      40.2        37       131        60
OIR    2025130    131400  -10.3800 -136.7800      40.0        37       136        60
OIR    2025130    131400  -10.3800 -136.7900      39.2        37       138        60
OIR    2025130    131400  -10.3800 -136.8000      39.0        37       140        60
OIR    2025130    131400  -10.3800 -136.8100      38.9        37       137        60
OIR    2025130    131400  -10.3800 -136.8200      39.2        35       135        60
OIR    2025130    131400  -10.3800 -136.8300      40.1        33       133        60
OIR    2025130    131400  -10.3800 -136.8400      40.7        32       133        60
OIR    2025130    131400  -10.3800 -136.8500      40.9        32       134        60
OIR    2025130    131400  -10.3800 -136.8600      40.9        31       135        60
OIR    2025130    131400  -10.3800 -136.8700      41.0        31       135        60
OIR    2025130    131400  -10.3800 -136.8800      41.1        30       135        60
OIR    2025130    131400  -10.3800 -136.8900      41.1        30       133        60
OIR    2025130    131400  -10.3800 -136.9000      41.2        30       130        60
OIR    2025130    131400  -10.3800 -136.9100      41.3        30       127        60
OIR    2025130    131400  -10.3800 -136.9200      41.4        30       125        60
OIR    2025130    131400  -10.3800 -136.9300      41.5        30       126        60
OIR    2025130    131400  -10.3800 -136.9400      41.5        30       131        60
OIR    2025130    131400  -10.3800 -136.9500      41.3        29       136        60
OIR    2025130    131400  -10.3800 -136.9600      40.6        28       138        60
OIR    2025130    131400  -10.3800 -136.9700      40.2        27       141        60
OIR    2025130    131400  -10.3800 -136.9800      40.0        27       141        60
OIR    2025130    131400  -10.3800 -136.9900      39.7        26       139        60
OIR    2025130    131400  -10.3800 -137.0000      38.5        22       128        60
OIR    2025130    131400  -10.3800 -137.0100      38.2        22       123        60
OIR    2025130    131400  -10.3800 -137.0200      38.2        22       122        60
OIR    2025130    131400  -10.3800 -137.0300      38.1        22       123        60
OIR    2025130    131400  -10.3800 -137.0400      38.1        22       128        60
OIR    2025130    131400  -10.3800 -137.0500      38.2        21       124        60
OIR    2025130    131400  -10.3800 -137.0600      38.2        21       119        60
OIR    2025130    131400  -10.3800 -137.0700      38.3        21       120        60
OIR    2025130    131400  -10.3800 -137.0800      38.5        20       122        60
OIR    2025130    131400  -10.3800 -137.0900      38.7        20       122        60
OIR    2025130    131400  -10.3800 -137.1000      38.7        20       121        60
OIR    2025130    131400  -10.3800 -137.1100      38.8        20       115        60
OIR    2025130    131400  -10.3800 -137.1200      38.9        20       111        60
OIR    2025130    131400  -10.3800 -137.1300      38.9        19       108        60
OIR    2025130    131400  -10.3800 -137.1400      38.9        19       110        60
OIR    2025130    131400  -10.3800 -137.1500      38.9        19       115        60
OIR    2025130    131400  -10.3800 -137.1600      38.9        18       120        60
OIR    2025130    131400  -10.3800 -137.1700      38.7        17       124        60
OIR    2025130    131400  -10.3800 -137.1800      38.6        17       121        60
OIR    2025130    131400  -10.3800 -137.1900      38.5        17       116        60
OIR    2025130    131400  -10.3800 -137.2000      38.4        16       113        60
OIR    2025130    131400  -10.3800 -137.2100      38.2        16       111        60
OIR    2025130    131400  -10.3800 -137.2200      38.0        16       114        60
OIR    2025130    131400  -10.3800 -137.2300      37.9        16       114        60
OIR    2025130    131400  -10.3800 -137.2400      37.8        16       112        60
OIR    2025130    131400  -10.3800 -137.2500      37.7        17       110        60
OIR    2025130    131400  -10.3800 -137.2600      37.7        17       105        60
OIR    2025130    131400  -10.3800 -137.2700      37.6        17       105        60
OIR    2025130    131400  -10.3800 -137.2800      37.5        17       107        60
OIR    2025130    131400  -10.3800 -137.2900      36.7        16       110        60
OIR    2025130    131400  -10.3800 -137.3000      36.0        15       113        60
OIR    2025130    131400  -10.3800 -137.3100      35.4        14       113        60
OIR    2025130    131400  -10.3800 -137.3200      35.0        13       113        60
OIR    2025130    131400  -10.3800 -137.3300      34.8        13       112        60
OIR    2025130    131400  -10.3800 -137.3400      34.6        12       110        60
OIR    2025130    131400  -10.3800 -137.3500      34.5        12       109        60
OIR    2025130    131400  -10.3800 -137.3600      34.2        11       107        60
OIR    2025130    131400  -10.3800 -137.3700      33.3         8       104        60
OIR    2025130    131400  -10.3800 -137.3800      32.4         6       104        60
OIR    2025130    131400  -10.3800 -137.3900      32.1         5       103        60
OIR    2025130    131400  -10.3800 -137.4000      31.9         5       104        60
OIR    2025130    131400  -10.3800 -137.4100      31.9         4       105        60
OIR    2025130    131400  -10.3800 -137.4200      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4300      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4400      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4500      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4600      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4700      31.9         4       104        60
OIR    2025130    131400  -10.3800 -137.4800      31.8         4       104        60
OIR    2025130    131400  -10.3800 -137.4900      31.8         4       105        60
OIR    2025130    131400  -10.3800 -137.5000      31.8         4       105        60
OIR    2025130    131400  -10.3800 -137.5100      31.8         4       107        60
OIR    2025130    131400  -10.3800 -137.5200      31.8         4       108        60
OIR    2025130    131400  -10.3800 -137.5300      31.8         4       110        60
OIR    2025130    131400  -10.3800 -137.5400      31.8         4       112        60
OIR    2025130    131400  -10.3800 -137.5500      31.7         4       115        60
OIR    2025130    131400  -10.3800 -137.5600      31.7         4       116        60
OIR    2025130    131400  -10.3800 -137.5700      31.7         4       116        60
OIR    2025130    131400  -10.3800 -137.5800      31.7         4       116        60
OIR    2025130    131400  -10.3800 -137.5900      31.7         4       116        60
OIR    2025130    131400  -10.3800 -137.6000      31.6         4       116        60
OIR    2025130    131400  -10.3800 -137.6100      31.6         4       116        60
OIR    2025130    131400  -10.3800 -137.6200      31.6         4       116        60
OIR    2025130    131400  -10.3800 -137.6300      31.6         4       116        60
OIR    2025130    131400  -10.3800 -137.6400      31.6         4       119        60
OIR    2025130    131400  -10.3800 -137.6500      31.6         4       120        60
OIR    2025130    131400  -10.3800 -137.6600      31.6         4       121        60
OIR    2025130    131400  -10.3800 -137.6700      31.5         4       123        60
OIR    2025130    131400  -10.3800 -137.6800      31.5         4       127        60
OIR    2025130    131400  -10.3800 -137.6900      31.4         4       131        60
OIR    2025130    131400  -10.3800 -137.7000      31.4         4       134        60
OIR    2025130    131400  -10.3800 -137.7100      31.3         4       136        60
OIR    2025130    131400  -10.3800 -137.7200      30.8         3       138        60
OIR    2025130    131400  -10.3800 -137.7300      29.4         2       141        60
OIR    2025130    131400  -10.3800 -137.7400      27.1         1       144        60
OIR    2025130    131400  -10.3800 -137.7500      25.1       360       144        60
OIR    2025130    131400  -10.3800 -137.7600      22.8       359       144        60
OIR    2025130    131400  -10.3800 -137.7700      20.9       358       144        60
OIR    2025130    131400  -10.3800 -137.7800      20.2       357       144        60
OIR    2025130    131400  -10.3800 -137.7900      20.0       357       147        60
OIR    2025130    131400  -10.3800 -137.8000      19.9       357       149        60
OIR    2025130    131400  -10.3800 -137.8100      19.8       357       149        60
OIR    2025130    131400  -10.3800 -137.8200      19.7       356       147        60
OIR    2025130    131400  -10.3800 -137.8300      19.6       356       144        60
OIR    2025130    131400  -10.3800 -137.8400      19.5       356       144        60
OIR    2025130    131400  -10.3800 -137.8500      19.4       356       144        60
OIR    2025130    131400  -10.3800 -137.8600      19.3       356       147        60
OIR    2025130    131400  -10.3800 -137.8700      19.0       356       149        60
OIR    2025130    131400  -10.3800 -137.8800      18.7       355       150        60
OIR    2025130    131400  -10.3800 -137.8900      18.4       355       150        60
OIR    2025130    131400  -10.3800 -137.9000      18.3       355       147        60
OIR    2025130    131400  -10.3800 -137.9100      18.2       356       145        60
OIR    2025130    131400  -10.3800 -137.9200      18.2       355       145        60
OIR    2025130    131400  -10.3800 -137.9300      18.2       355       145        60
OIR    2025130    131400  -10.3800 -137.9400      18.2       355       145        60
OIR    2025130    131400  -10.3800 -137.9500      18.2       355       144        60
OIR    2025130    131400  -10.3800 -137.9600      18.2       355       142        60
OIR    2025130    131400  -10.3800 -137.9700      18.4       355       144        60
OIR    2025130    131400  -10.3800 -137.9800      18.6       355       146        60
OIR    2025130    131400  -10.3800 -137.9900      19.0       355       146        60
OIR    2025130    131400  -10.3800 -138.0000      20.0       355       147        60
OIR    2025130    131400  -10.3800 -138.0100      21.7       353       148        60
OIR    2025130    131400  -10.3800 -138.0200      23.1       351       147        60
OIR    2025130    131400  -10.3800 -138.0300      23.8       350       143        60
OIR    2025130    131400  -10.3800 -138.0400      24.3       350       140        60
OIR    2025130    131400  -10.3800 -138.0500      24.7       349       139        60
OIR    2025130    131400  -10.3800 -138.0600      24.9       348       137        60
OIR    2025130    131400  -10.3800 -138.0700      25.1       348       136        60
OIR    2025130    131400  -10.3800 -138.0800      25.2       348       137        60
OIR    2025130    131400  -10.3800 -138.0900      25.3       347       137        60
OIR    2025130    131400  -10.3800 -138.1000      25.3       348       138        60
OIR    2025130    131400  -10.3800 -138.1100      25.4       348       138        60
OIR    2025130    131400  -10.3800 -138.1200      25.4       348       138        60
OIR    2025130    131400  -10.3800 -138.1300      25.5       348       136        60
OIR    2025130    131400  -10.3800 -138.1400      25.7       347       134        60
OIR    2025130    131400  -10.3800 -138.1500      26.2       346       133        60
OIR    2025130    131400  -10.3800 -138.1600      27.0       345       133        60
OIR    2025130    131400  -10.3800 -138.1700      27.4       345       130        60
OIR    2025130    131400  -10.3800 -138.1800      27.8       345       127        60
OIR    2025130    131400  -10.3800 -138.1900      28.2       345       128        60
OIR    2025130    131400  -10.3800 -138.2000      28.6       345       128        60
OIR    2025130    131400  -10.3800 -138.2100      29.2       345       126        60
OIR    2025130    131400  -10.3800 -138.2200      29.7       345       125        60
OIR    2025130    131400  -10.3800 -138.2300      30.1       344       127        60
OIR    2025130    131400  -10.3800 -138.2400      30.3       344       128        60
OIR    2025130    131400  -10.3800 -138.2500      30.6       343       129        60
OIR    2025130    131400  -10.3800 -138.2600      31.1       342       133        60
OIR    2025130    131400  -10.3800 -138.2700      31.5       342       140        60
OIR    2025130    131400  -10.3800 -138.2800      31.7       341       144        60
OIR    2025130    131400  -10.3800 -138.2900      31.6       341       147        60
OIR    2025130    131400  -10.3800 -138.3000      31.6       341       144        60
OIR    2025130    131400  -10.3800 -138.3100      31.5       341       141        60
OIR    2025130    131400  -10.3800 -138.3200      31.5       341       138        60
OIR    2025130    131400  -10.3800 -138.3300      31.3       342       136        60
OIR    2025130    131400  -10.3800 -138.3400      30.9       343       136        60
OIR    2025130    131400  -10.3800 -138.3500      30.3       344       137        60
OIR    2025130    131400  -10.3800 -138.3600      29.5       345       138        60
OIR    2025130    131400  -10.3800 -138.3700      29.0       345       140        60
OIR    2025130    131400  -10.3800 -138.3800      28.4       347       143        60
OIR    2025130    131400  -10.3800 -138.3900      27.9       347       148        60
OIR    2025130    131400  -10.3900 -136.3100      41.6        41       147        60
OIR    2025130    131400  -10.3900 -136.3200      41.8        41       144        60
OIR    2025130    131400  -10.3900 -136.3300      41.9        41       142        60
OIR    2025130    131400  -10.3900 -136.3400      42.0        40       140        60
OIR    2025130    131400  -10.3900 -136.3500      42.0        40       138        60
OIR    2025130    131400  -10.3900 -136.3600      42.1        40       138        60
OIR    2025130    131400  -10.3900 -136.3700      42.1        40       137        60
OIR    2025130    131400  -10.3900 -136.3800      42.2        40       136        60
OIR    2025130    131400  -10.3900 -136.3900      42.2        40       136        60
OIR    2025130    131400  -10.3900 -136.4000      42.2        40       136        60
OIR    2025130    131400  -10.3900 -136.4100      42.3        40       134        60
OIR    2025130    131400  -10.3900 -136.4200      42.3        40       132        60
OIR    2025130    131400  -10.3900 -136.4300      42.3        40       130        60
OIR    2025130    131400  -10.3900 -136.4400      42.4        40       132        60
OIR    2025130    131400  -10.3900 -136.4500      42.4        40       136        60
OIR    2025130    131400  -10.3900 -136.4600      42.4        40       138        60
OIR    2025130    131400  -10.3900 -136.4700      42.4        40       138        60
OIR    2025130    131400  -10.3900 -136.4800      42.4        40       137        60
OIR    2025130    131400  -10.3900 -136.4900      42.3        40       135        60
OIR    2025130    131400  -10.3900 -136.5000      42.3        40       132        60
OIR    2025130    131400  -10.3900 -136.5100      42.2        40       130        60
OIR    2025130    131400  -10.3900 -136.5200      42.2        40       132        60
OIR    2025130    131400  -10.3900 -136.5300      42.1        39       132        60
OIR    2025130    131400  -10.3900 -136.5400      42.1        39       131        60
OIR    2025130    131400  -10.3900 -136.5500      42.0        39       131        60
OIR    2025130    131400  -10.3900 -136.5600      42.0        39       134        60
OIR    2025130    131400  -10.3900 -136.5700      42.0        39       135        60
OIR    2025130    131400  -10.3900 -136.5800      41.9        39       135        60
OIR    2025130    131400  -10.3900 -136.5900      41.9        39       138        60
OIR    2025130    131400  -10.3900 -136.6000      41.9        39       141        60
OIR    2025130    131400  -10.3900 -136.6100      41.8        39       140        60
OIR    2025130    131400  -10.3900 -136.6200      41.6        39       138        60
OIR    2025130    131400  -10.3900 -136.6300      41.6        39       135        60
OIR    2025130    131400  -10.3900 -136.6400      41.5        39       134        60
OIR    2025130    131400  -10.3900 -136.6500      41.5        39       133        60
OIR    2025130    131400  -10.3900 -136.6600      41.4        39       133        60
OIR    2025130    131400  -10.3900 -136.6700      41.4        39       134        60
OIR    2025130    131400  -10.3900 -136.6800      41.3        39       137        60
OIR    2025130    131400  -10.3900 -136.6900      41.3        38       142        60
OIR    2025130    131400  -10.3900 -136.7000      41.2        38       143        60
OIR    2025130    131400  -10.3900 -136.7100      41.1        38       143        60
OIR    2025130    131400  -10.3900 -136.7200      40.9        38       144        60
OIR    2025130    131400  -10.3900 -136.7300      40.8        38       144        60
OIR    2025130    131400  -10.3900 -136.7400      40.7        38       136        60
OIR    2025130    131400  -10.3900 -136.7500      40.6        38       132        60
OIR    2025130    131400  -10.3900 -136.7600      40.5        38       131        60
OIR    2025130    131400  -10.3900 -136.7700      40.3        37       132        60
OIR    2025130    131400  -10.3900 -136.7800      40.1        37       136        60
OIR    2025130    131400  -10.3900 -136.7900      39.6        36       139        60
OIR    2025130    131400  -10.3900 -136.8000      39.5        36       141        60
OIR    2025130    131400  -10.3900 -136.8100      39.7        35       138        60
OIR    2025130    131400  -10.3900 -136.8200      40.2        34       135        60
OIR    2025130    131400  -10.3900 -136.8300      40.6        32       134        60
OIR    2025130    131400  -10.3900 -136.8400      40.9        32       135        60
OIR    2025130    131400  -10.3900 -136.8500      40.9        32       137        60
OIR    2025130    131400  -10.3900 -136.8600      40.9        32       138        60
OIR    2025130    131400  -10.3900 -136.8700      40.9        31       137        60
OIR    2025130    131400  -10.3900 -136.8800      41.0        30       135        60
OIR    2025130    131400  -10.3900 -136.8900      41.0        30       131        60
OIR    2025130    131400  -10.3900 -136.9000      41.1        30       128        60
OIR    2025130    131400  -10.3900 -136.9100      41.1        30       125        60
OIR    2025130    131400  -10.3900 -136.9200      41.2        30       124        60
OIR    2025130    131400  -10.3900 -136.9300      41.3        30       126        60
OIR    2025130    131400  -10.3900 -136.9400      41.3        29       131        60
OIR    2025130    131400  -10.3900 -136.9500      41.2        29       136        60
OIR    2025130    131400  -10.3900 -136.9600      40.7        28       139        60
OIR    2025130    131400  -10.3900 -136.9700      40.4        27       142        60
OIR    2025130    131400  -10.3900 -136.9800      40.3        27       141        60
OIR    2025130    131400  -10.3900 -136.9900      39.8        25       137        60
OIR    2025130    131400  -10.3900 -137.0000      38.5        22       128        60
OIR    2025130    131400  -10.3900 -137.0100      38.2        22       126        60
OIR    2025130    131400  -10.3900 -137.0200      38.2        22       127        60
OIR    2025130    131400  -10.3900 -137.0300      38.2        22       127        60
OIR    2025130    131400  -10.3900 -137.0400      38.2        21       127        60
OIR    2025130    131400  -10.3900 -137.0500      38.2        21       122        60
OIR    2025130    131400  -10.3900 -137.0600      38.3        21       116        60
OIR    2025130    131400  -10.3900 -137.0700      38.5        20       116        60
OIR    2025130    131400  -10.3900 -137.0800      38.6        20       116        60
OIR    2025130    131400  -10.3900 -137.0900      38.8        19       115        60
OIR    2025130    131400  -10.3900 -137.1000      38.8        19       113        60
OIR    2025130    131400  -10.3900 -137.1100      38.8        19       109        60
OIR    2025130    131400  -10.3900 -137.1200      38.9        19       108        60
OIR    2025130    131400  -10.3900 -137.1300      38.9        19       108        60
OIR    2025130    131400  -10.3900 -137.1400      38.9        19       110        60
OIR    2025130    131400  -10.3900 -137.1500      38.9        19       113        60
OIR    2025130    131400  -10.3900 -137.1600      38.9        18       114        60
OIR    2025130    131400  -10.3900 -137.1700      38.7        17       113        60
OIR    2025130    131400  -10.3900 -137.1800      38.6        17       112        60
OIR    2025130    131400  -10.3900 -137.1900      38.6        17       110        60
OIR    2025130    131400  -10.3900 -137.2000      38.5        17       110        60
OIR    2025130    131400  -10.3900 -137.2100      38.3        17       112        60
OIR    2025130    131400  -10.3900 -137.2200      38.1        17       116        60
OIR    2025130    131400  -10.3900 -137.2300      37.8        16       117        60
OIR    2025130    131400  -10.3900 -137.2400      37.7        16       116        60
OIR    2025130    131400  -10.3900 -137.2500      37.6        16       114        60
OIR    2025130    131400  -10.3900 -137.2600      37.5        16       109        60
OIR    2025130    131400  -10.3900 -137.2700      37.5        16       108        60
OIR    2025130    131400  -10.3900 -137.2800      37.1        16       107        60
OIR    2025130    131400  -10.3900 -137.2900      35.8        15       109        60
OIR    2025130    131400  -10.3900 -137.3000      35.3        14       112        60
OIR    2025130    131400  -10.3900 -137.3100      35.0        13       113        60
OIR    2025130    131400  -10.3900 -137.3200      34.7        13       115        60
OIR    2025130    131400  -10.3900 -137.3300      34.5        12       115        60
OIR    2025130    131400  -10.3900 -137.3400      34.5        12       113        60
OIR    2025130    131400  -10.3900 -137.3500      34.3        12       110        60
OIR    2025130    131400  -10.3900 -137.3600      33.9        10       107        60
OIR    2025130    131400  -10.3900 -137.3700      33.1         8       104        60
OIR    2025130    131400  -10.3900 -137.3800      32.1         5       104        60
OIR    2025130    131400  -10.3900 -137.3900      31.9         5       104        60
OIR    2025130    131400  -10.3900 -137.4000      31.9         5       104        60
OIR    2025130    131400  -10.3900 -137.4100      31.9         4       104        60
OIR    2025130    131400  -10.3900 -137.4200      31.9         4       105        60
OIR    2025130    131400  -10.3900 -137.4300      31.9         4       105        60
OIR    2025130    131400  -10.3900 -137.4400      31.9         4       104        60
OIR    2025130    131400  -10.3900 -137.4500      31.8         4       104        60
OIR    2025130    131400  -10.3900 -137.4600      31.8         4       104        60
OIR    2025130    131400  -10.3900 -137.4700      31.8         4       104        60
OIR    2025130    131400  -10.3900 -137.4800      31.8         4       105        60
OIR    2025130    131400  -10.3900 -137.4900      31.8         4       105        60
OIR    2025130    131400  -10.3900 -137.5000      31.8         4       104        60
OIR    2025130    131400  -10.3900 -137.5100      31.8         4       105        60
OIR    2025130    131400  -10.3900 -137.5200      31.8         4       107        60
OIR    2025130    131400  -10.3900 -137.5300      31.8         4       110        60
OIR    2025130    131400  -10.3900 -137.5400      31.8         4       114        60
OIR    2025130    131400  -10.3900 -137.5500      31.7         4       116        60
OIR    2025130    131400  -10.3900 -137.5600      31.7         4       117        60
OIR    2025130    131400  -10.3900 -137.5700      31.7         4       116        60
OIR    2025130    131400  -10.3900 -137.5800      31.7         4       116        60
OIR    2025130    131400  -10.3900 -137.5900      31.7         4       116        60
OIR    2025130    131400  -10.3900 -137.6000      31.6         4       116        60
OIR    2025130    131400  -10.3900 -137.6100      31.6         4       116        60
OIR    2025130    131400  -10.3900 -137.6200      31.6         4       117        60
OIR    2025130    131400  -10.3900 -137.6300      31.6         4       119        60
OIR    2025130    131400  -10.3900 -137.6400      31.6         4       121        60
OIR    2025130    131400  -10.3900 -137.6500      31.6         4       122        60
OIR    2025130    131400  -10.3900 -137.6600      31.6         4       123        60
OIR    2025130    131400  -10.3900 -137.6700      31.6         4       125        60
OIR    2025130    131400  -10.3900 -137.6800      31.5         4       130        60
OIR    2025130    131400  -10.3900 -137.6900      31.5         4       134        60
OIR    2025130    131400  -10.3900 -137.7000      31.4         4       138        60
OIR    2025130    131400  -10.3900 -137.7100      31.4         4       140        60
OIR    2025130    131400  -10.3900 -137.7200      31.0         4       142        60
OIR    2025130    131400  -10.3900 -137.7300      29.1         2       144        60
OIR    2025130    131400  -10.3900 -137.7400      26.0         0       146        60
OIR    2025130    131400  -10.3900 -137.7500      23.9       359       148        60
OIR    2025130    131400  -10.3900 -137.7600      21.7       358       148        60
OIR    2025130    131400  -10.3900 -137.7700      20.4       358       146        60
OIR    2025130    131400  -10.3900 -137.7800      20.1       357       145        60
OIR    2025130    131400  -10.3900 -137.7900      19.9       357       146        60
OIR    2025130    131400  -10.3900 -137.8000      19.8       357       148        60
OIR    2025130    131400  -10.3900 -137.8100      19.8       357       148        60
OIR    2025130    131400  -10.3900 -137.8200      19.7       357       146        60
OIR    2025130    131400  -10.3900 -137.8300      19.6       356       144        60
OIR    2025130    131400  -10.3900 -137.8400      19.5       356       143        60
OIR    2025130    131400  -10.3900 -137.8500      19.4       356       143        60
OIR    2025130    131400  -10.3900 -137.8600      19.2       356       147        60
OIR    2025130    131400  -10.3900 -137.8700      18.8       356       150        60
OIR    2025130    131400  -10.3900 -137.9000      18.2       356       150        60
OIR    2025130    131400  -10.3900 -137.9100      18.2       356       149        60
OIR    2025130    131400  -10.3900 -137.9200      18.2       356       149        60
OIR    2025130    131400  -10.3900 -137.9700      18.3       355       149        60
OIR    2025130    131400  -10.3900 -137.9800      18.4       356       148        60
OIR    2025130    131400  -10.3900 -137.9900      18.8       356       148        60
OIR    2025130    131400  -10.3900 -138.0000      19.4       356       149        60
OIR    2025130    131400  -10.3900 -138.0100      20.6       354       150        60
OIR    2025130    131400  -10.3900 -138.0200      22.3       352       149        60
OIR    2025130    131400  -10.3900 -138.0300      23.4       351       146        60
OIR    2025130    131400  -10.3900 -138.0400      24.0       350       143        60
OIR    2025130    131400  -10.3900 -138.0500      24.4       350       140        60
OIR    2025130    131400  -10.3900 -138.0600      24.6       349       138        60
OIR    2025130    131400  -10.3900 -138.0700      24.8       348       136        60
OIR    2025130    131400  -10.3900 -138.0800      24.9       348       137        60
OIR    2025130    131400  -10.3900 -138.0900      24.9       348       138        60
OIR    2025130    131400  -10.3900 -138.1000      24.9       348       140        60
OIR    2025130    131400  -10.3900 -138.1100      25.0       348       140        60
OIR    2025130    131400  -10.3900 -138.1200      25.1       348       138        60
OIR    2025130    131400  -10.3900 -138.1300      25.3       348       135        60
OIR    2025130    131400  -10.3900 -138.1400      25.5       348       133        60
OIR    2025130    131400  -10.3900 -138.1500      26.0       347       133        60
OIR    2025130    131400  -10.3900 -138.1600      26.8       347       134        60
OIR    2025130    131400  -10.3900 -138.1700      27.2       346       132        60
OIR    2025130    131400  -10.3900 -138.1800      27.6       346       130        60
OIR    2025130    131400  -10.3900 -138.1900      28.0       347       130        60
OIR    2025130    131400  -10.3900 -138.2000      28.7       347       130        60
OIR    2025130    131400  -10.3900 -138.2100      29.2       347       129        60
OIR    2025130    131400  -10.3900 -138.2200      29.6       347       129        60
OIR    2025130    131400  -10.3900 -138.2300      29.9       346       130        60
OIR    2025130    131400  -10.3900 -138.2400      30.2       346       132        60
OIR    2025130    131400  -10.3900 -138.2500      30.5       345       135        60
OIR    2025130    131400  -10.3900 -138.2600      30.8       344       137        60
OIR    2025130    131400  -10.3900 -138.2700      31.4       343       141        60
OIR    2025130    131400  -10.3900 -138.2800      31.7       342       141        60
OIR    2025130    131400  -10.3900 -138.2900      31.6       342       141        60
OIR    2025130    131400  -10.3900 -138.3000      31.4       342       139        60
OIR    2025130    131400  -10.3900 -138.3100      31.2       342       137        60
OIR    2025130    131400  -10.3900 -138.3200      30.8       344       135        60
OIR    2025130    131400  -10.3900 -138.3300      30.7       344       133        60
OIR    2025130    131400  -10.3900 -138.3400      30.4       345       135        60
OIR    2025130    131400  -10.3900 -138.3500      29.8       346       136        60
OIR    2025130    131400  -10.3900 -138.3600      29.2       347       137        60
OIR    2025130    131400  -10.3900 -138.3700      28.7       348       139        60
OIR    2025130    131400  -10.3900 -138.3800      28.4       349       141        60
OIR    2025130    131400  -10.3900 -138.3900      28.1       349       146        60
OIR    2025130    131400  -10.4000 -136.3100      41.5        41       147        60
OIR    2025130    131400  -10.4000 -136.3200      41.7        41       143        60
OIR    2025130    131400  -10.4000 -136.3300      41.8        40       140        60
OIR    2025130    131400  -10.4000 -136.3400      41.9        40       138        60
OIR    2025130    131400  -10.4000 -136.3500      41.9        40       137        60
OIR    2025130    131400  -10.4000 -136.3600      42.0        40       138        60
OIR    2025130    131400  -10.4000 -136.3700      42.0        40       137        60
OIR    2025130    131400  -10.4000 -136.3800      42.0        40       136        60
OIR    2025130    131400  -10.4000 -136.3900      42.1        40       136        60
OIR    2025130    131400  -10.4000 -136.4000      42.1        40       135        60
OIR    2025130    131400  -10.4000 -136.4100      42.2        40       135        60
OIR    2025130    131400  -10.4000 -136.4200      42.3        40       133        60
OIR    2025130    131400  -10.4000 -136.4300      42.3        40       129        60
OIR    2025130    131400  -10.4000 -136.4400      42.3        40       132        60
OIR    2025130    131400  -10.4000 -136.4500      42.3        40       136        60
OIR    2025130    131400  -10.4000 -136.4600      42.3        40       137        60
OIR    2025130    131400  -10.4000 -136.4700      42.3        40       137        60
OIR    2025130    131400  -10.4000 -136.4800      42.3        40       136        60
OIR    2025130    131400  -10.4000 -136.4900      42.3        39       135        60
OIR    2025130    131400  -10.4000 -136.5000      42.2        39       132        60
OIR    2025130    131400  -10.4000 -136.5100      42.2        39       129        60
OIR    2025130    131400  -10.4000 -136.5200      42.2        39       131        60
OIR    2025130    131400  -10.4000 -136.5300      42.1        39       132        60
OIR    2025130    131400  -10.4000 -136.5400      42.1        39       132        60
OIR    2025130    131400  -10.4000 -136.5500      42.0        39       133        60
OIR    2025130    131400  -10.4000 -136.5600      42.0        39       136        60
OIR    2025130    131400  -10.4000 -136.5700      42.0        39       138        60
OIR    2025130    131400  -10.4000 -136.5800      42.0        39       137        60
OIR    2025130    131400  -10.4000 -136.5900      42.0        39       140        60
OIR    2025130    131400  -10.4000 -136.6000      41.9        39       144        60
OIR    2025130    131400  -10.4000 -136.6100      41.9        39       143        60
OIR    2025130    131400  -10.4000 -136.6200      41.7        39       140        60
OIR    2025130    131400  -10.4000 -136.6300      41.6        39       137        60
OIR    2025130    131400  -10.4000 -136.6400      41.6        39       135        60
OIR    2025130    131400  -10.4000 -136.6500      41.5        39       135        60
OIR    2025130    131400  -10.4000 -136.6600      41.5        39       136        60
OIR    2025130    131400  -10.4000 -136.6700      41.5        39       137        60
OIR    2025130    131400  -10.4000 -136.6800      41.5        38       140        60
OIR    2025130    131400  -10.4000 -136.6900      41.5        38       145        60
OIR    2025130    131400  -10.4000 -136.7000      41.5        38       145        60
OIR    2025130    131400  -10.4000 -136.7100      41.3        38       145        60
OIR    2025130    131400  -10.4000 -136.7200      41.1        38       145        60
OIR    2025130    131400  -10.4000 -136.7300      40.9        38       144        60
OIR    2025130    131400  -10.4000 -136.7400      40.8        38       138        60
OIR    2025130    131400  -10.4000 -136.7500      40.7        37       134        60
OIR    2025130    131400  -10.4000 -136.7600      40.6        37       133        60
OIR    2025130    131400  -10.4000 -136.7700      40.4        36       134        60
OIR    2025130    131400  -10.4000 -136.7800      40.4        36       137        60
OIR    2025130    131400  -10.4000 -136.7900      40.4        35       140        60
OIR    2025130    131400  -10.4000 -136.8000      40.6        34       142        60
OIR    2025130    131400  -10.4000 -136.8100      40.6        33       139        60
OIR    2025130    131400  -10.4000 -136.8200      40.7        33       135        60
OIR    2025130    131400  -10.4000 -136.8300      40.9        32       135        60
OIR    2025130    131400  -10.4000 -136.8400      40.9        32       137        60
OIR    2025130    131400  -10.4000 -136.8500      40.9        32       139        60
OIR    2025130    131400  -10.4000 -136.8600      40.9        32       140        60
OIR    2025130    131400  -10.4000 -136.8700      40.8        31       138        60
OIR    2025130    131400  -10.4000 -136.8800      40.9        30       135        60
OIR    2025130    131400  -10.4000 -136.8900      40.9        30       130        60
OIR    2025130    131400  -10.4000 -136.9000      41.0        30       127        60
OIR    2025130    131400  -10.4000 -136.9100      41.0        30       126        60
OIR    2025130    131400  -10.4000 -136.9200      41.1        30       126        60
OIR    2025130    131400  -10.4000 -136.9300      41.3        30       128        60
OIR    2025130    131400  -10.4000 -136.9400      41.3        29       132        60
OIR    2025130    131400  -10.4000 -136.9500      41.2        29       137        60
OIR    2025130    131400  -10.4000 -136.9600      40.8        28       141        60
OIR    2025130    131400  -10.4000 -136.9700      40.6        27       145        60
OIR    2025130    131400  -10.4000 -136.9800      40.6        27       143        60
OIR    2025130    131400  -10.4000 -136.9900      39.9        25       139        60
OIR    2025130    131400  -10.4000 -137.0000      38.9        23       132        60
OIR    2025130    131400  -10.4000 -137.0100      38.2        22       131        60
OIR    2025130    131400  -10.4000 -137.0200      38.2        22       132        60
OIR    2025130    131400  -10.4000 -137.0300      38.2        21       131        60
OIR    2025130    131400  -10.4000 -137.0400      38.2        21       127        60
OIR    2025130    131400  -10.4000 -137.0500      38.3        21       121        60
OIR    2025130    131400  -10.4000 -137.0600      38.5        20       116        60
OIR    2025130    131400  -10.4000 -137.0700      38.6        20       115        60
OIR    2025130    131400  -10.4000 -137.0800      38.7        19       115        60
OIR    2025130    131400  -10.4000 -137.0900      38.8        19       113        60
OIR    2025130    131400  -10.4000 -137.1000      38.8        19       110        60
OIR    2025130    131400  -10.4000 -137.1100      38.8        19       108        60
OIR    2025130    131400  -10.4000 -137.1200      38.9        19       107        60
OIR    2025130    131400  -10.4000 -137.1300      38.9        19       108        60
OIR    2025130    131400  -10.4000 -137.1400      38.9        19       109        60
OIR    2025130    131400  -10.4000 -137.1500      38.9        18       110        60
OIR    2025130    131400  -10.4000 -137.1600      38.9        18       109        60
OIR    2025130    131400  -10.4000 -137.1700      38.7        18       108        60
OIR    2025130    131400  -10.4000 -137.1800      38.6        18       107        60
OIR    2025130    131400  -10.4000 -137.1900      38.6        18       105        60
OIR    2025130    131400  -10.4000 -137.2000      38.5        17       109        60
OIR    2025130    131400  -10.4000 -137.2100      38.3        17       113        60
OIR    2025130    131400  -10.4000 -137.2200      38.2        17       116        60
OIR    2025130    131400  -10.4000 -137.2300      37.7        16       117        60
OIR    2025130    131400  -10.4000 -137.2400      37.6        16       116        60
OIR    2025130    131400  -10.4000 -137.2500      37.5        16       115        60
OIR    2025130    131400  -10.4000 -137.2600      37.4        16       112        60
OIR    2025130    131400  -10.4000 -137.2700      37.2        16       111        60
OIR    2025130    131400  -10.4000 -137.2800      36.6        16       110        60
OIR    2025130    131400  -10.4000 -137.2900      35.2        14       111        60
OIR    2025130    131400  -10.4000 -137.3000      34.7        13       113        60
OIR    2025130    131400  -10.4000 -137.3100      34.5        13       114        60
OIR    2025130    131400  -10.4000 -137.3200      34.5        12       114        60
OIR    2025130    131400  -10.4000 -137.3300      34.4        12       115        60
OIR    2025130    131400  -10.4000 -137.3400      34.3        12       113        60
OIR    2025130    131400  -10.4000 -137.3500      33.8        11       110        60
OIR    2025130    131400  -10.4000 -137.3600      33.2        10       108        60
OIR    2025130    131400  -10.4000 -137.3700      32.5         8       105        60
OIR    2025130    131400  -10.4000 -137.3800      31.9         5       105        60
OIR    2025130    131400  -10.4000 -137.3900      31.8         5       107        60
OIR    2025130    131400  -10.4000 -137.4000      31.8         4       105        60
OIR    2025130    131400  -10.4000 -137.4100      31.8         4       104        60
OIR    2025130    131400  -10.4000 -137.4200      31.8         4       105        60
OIR    2025130    131400  -10.4000 -137.4300      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.4400      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.4500      31.8         4       105        60
OIR    2025130    131400  -10.4000 -137.4600      31.8         4       104        60
OIR    2025130    131400  -10.4000 -137.4700      31.8         4       105        60
OIR    2025130    131400  -10.4000 -137.4800      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.4900      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.5000      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.5100      31.8         4       107        60
OIR    2025130    131400  -10.4000 -137.5200      31.8         4       108        60
OIR    2025130    131400  -10.4000 -137.5300      31.8         4       111        60
OIR    2025130    131400  -10.4000 -137.5400      31.8         4       113        60
OIR    2025130    131400  -10.4000 -137.5500      31.8         4       114        60
OIR    2025130    131400  -10.4000 -137.5600      31.8         4       116        60
OIR    2025130    131400  -10.4000 -137.5700      31.7         4       115        60
OIR    2025130    131400  -10.4000 -137.5800      31.7         4       115        60
OIR    2025130    131400  -10.4000 -137.5900      31.7         4       115        60
OIR    2025130    131400  -10.4000 -137.6000      31.7         4       116        60
OIR    2025130    131400  -10.4000 -137.6100      31.7         4       116        60
OIR    2025130    131400  -10.4000 -137.6200      31.6         4       117        60
OIR    2025130    131400  -10.4000 -137.6300      31.6         4       120        60
OIR    2025130    131400  -10.4000 -137.6400      31.6         4       122        60
OIR    2025130    131400  -10.4000 -137.6500      31.6         4       123        60
OIR    2025130    131400  -10.4000 -137.6600      31.6         4       125        60
OIR    2025130    131400  -10.4000 -137.6700      31.6         4       126        60
OIR    2025130    131400  -10.4000 -137.6800      31.5         4       130        60
OIR    2025130    131400  -10.4000 -137.6900      31.5         4       134        60
OIR    2025130    131400  -10.4000 -137.7000      31.5         4       138        60
OIR    2025130    131400  -10.4000 -137.7100      31.4         4       140        60
OIR    2025130    131400  -10.4000 -137.7200      31.1         4       143        60
OIR    2025130    131400  -10.4000 -137.7300      28.6         2       144        60
OIR    2025130    131400  -10.4000 -137.7400      25.3         0       144        60
OIR    2025130    131400  -10.4000 -137.7500      23.5       359       146        60
OIR    2025130    131400  -10.4000 -137.7600      21.3       358       146        60
OIR    2025130    131400  -10.4000 -137.7700      20.2       357       144        60
OIR    2025130    131400  -10.4000 -137.7800      20.0       357       143        60
OIR    2025130    131400  -10.4000 -137.7900      19.9       357       144        60
OIR    2025130    131400  -10.4000 -137.8000      19.8       357       145        60
OIR    2025130    131400  -10.4000 -137.8100      19.7       357       145        60
OIR    2025130    131400  -10.4000 -137.8200      19.6       357       145        60
OIR    2025130    131400  -10.4000 -137.8300      19.5       356       144        60
OIR    2025130    131400  -10.4000 -137.8400      19.4       356       143        60
OIR    2025130    131400  -10.4000 -137.8500      19.3       356       143        60
OIR    2025130    131400  -10.4000 -137.8600      19.0       356       144        60
OIR    2025130    131400  -10.4000 -137.8700      18.7       356       146        60
OIR    2025130    131400  -10.4000 -137.8800      18.5       356       148        60
OIR    2025130    131400  -10.4000 -137.8900      18.4       356       150        60
OIR    2025130    131400  -10.4000 -137.9000      18.3       356       150        60
OIR    2025130    131400  -10.4000 -137.9100      18.2       356       150        60
OIR    2025130    131400  -10.4000 -137.9200      18.2       356       150        60
OIR    2025130    131400  -10.4000 -137.9700      18.2       356       149        60
OIR    2025130    131400  -10.4000 -137.9800      18.4       356       149        60
OIR    2025130    131400  -10.4000 -138.0400      23.7       352       147        60
OIR    2025130    131400  -10.4000 -138.0500      24.1       351       142        60
OIR    2025130    131400  -10.4000 -138.0600      24.3       350       140        60
OIR    2025130    131400  -10.4000 -138.0700      24.5       349       138        60
OIR    2025130    131400  -10.4000 -138.0800      24.5       348       138        60
OIR    2025130    131400  -10.4000 -138.0900      24.6       348       138        60
OIR    2025130    131400  -10.4000 -138.1000      24.7       348       139        60
OIR    2025130    131400  -10.4000 -138.1100      24.8       348       139        60
OIR    2025130    131400  -10.4000 -138.1200      24.9       348       136        60
OIR    2025130    131400  -10.4000 -138.1300      25.1       348       134        60
OIR    2025130    131400  -10.4000 -138.1400      25.3       348       134        60
OIR    2025130    131400  -10.4000 -138.1500      26.0       348       133        60
OIR    2025130    131400  -10.4000 -138.1600      26.7       347       133        60
OIR    2025130    131400  -10.4000 -138.1700      27.2       347       131        60
OIR    2025130    131400  -10.4000 -138.1800      27.7       348       129        60
OIR    2025130    131400  -10.4000 -138.1900      28.3       349       130        60
OIR    2025130    131400  -10.4000 -138.2000      28.8       349       131        60
OIR    2025130    131400  -10.4000 -138.2100      29.3       349       130        60
OIR    2025130    131400  -10.4000 -138.2200      29.6       349       130        60
OIR    2025130    131400  -10.4000 -138.2300      29.8       349       132        60
OIR    2025130    131400  -10.4000 -138.2400      30.0       348       134        60
OIR    2025130    131400  -10.4000 -138.2500      30.2       347       136        60
OIR    2025130    131400  -10.4000 -138.2600      30.4       346       138        60
OIR    2025130    131400  -10.4000 -138.2700      30.9       345       140        60
OIR    2025130    131400  -10.4000 -138.2800      31.0       345       138        60
OIR    2025130    131400  -10.4000 -138.2900      30.7       345       137        60
OIR    2025130    131400  -10.4000 -138.3000      30.1       346       135        60
OIR    2025130    131400  -10.4000 -138.3100      29.6       348       134        60
OIR    2025130    131400  -10.4000 -138.3200      29.2       349       133        60
OIR    2025130    131400  -10.4000 -138.3300      29.3       349       133        60
OIR    2025130    131400  -10.4000 -138.3400      29.2       350       135        60
OIR    2025130    131400  -10.4000 -138.3500      29.0       350       136        60
OIR    2025130    131400  -10.4000 -138.3600      28.8       350       137        60
OIR    2025130    131400  -10.4000 -138.3700      28.6       350       139        60
OIR    2025130    131400  -10.4000 -138.3800      28.4       351       143        60
OIR    2025130    131400  -10.4000 -138.3900      28.2       351       147        60
OIR    2025130    131400  -10.4100 -136.3100      41.5        41       147        60
OIR    2025130    131400  -10.4100 -136.3200      41.6        41       142        60
OIR    2025130    131400  -10.4100 -136.3300      41.7        40       138        60
OIR    2025130    131400  -10.4100 -136.3400      41.8        40       136        60
OIR    2025130    131400  -10.4100 -136.3500      41.8        40       135        60
OIR    2025130    131400  -10.4100 -136.3600      41.9        40       136        60
OIR    2025130    131400  -10.4100 -136.3700      41.9        40       136        60
OIR    2025130    131400  -10.4100 -136.3800      41.9        40       135        60
OIR    2025130    131400  -10.4100 -136.3900      41.9        40       135        60
OIR    2025130    131400  -10.4100 -136.4000      41.9        40       135        60
OIR    2025130    131400  -10.4100 -136.4100      42.0        40       135        60
OIR    2025130    131400  -10.4100 -136.4200      42.1        40       134        60
OIR    2025130    131400  -10.4100 -136.4300      42.2        40       131        60
OIR    2025130    131400  -10.4100 -136.4400      42.3        40       132        60
OIR    2025130    131400  -10.4100 -136.4500      42.3        40       135        60
OIR    2025130    131400  -10.4100 -136.4600      42.3        40       136        60
OIR    2025130    131400  -10.4100 -136.4700      42.2        40       136        60
OIR    2025130    131400  -10.4100 -136.4800      42.2        40       137        60
OIR    2025130    131400  -10.4100 -136.4900      42.2        39       137        60
OIR    2025130    131400  -10.4100 -136.5000      42.2        39       135        60
OIR    2025130    131400  -10.4100 -136.5100      42.2        39       134        60
OIR    2025130    131400  -10.4100 -136.5200      42.1        39       136        60
OIR    2025130    131400  -10.4100 -136.5300      42.1        39       137        60
OIR    2025130    131400  -10.4100 -136.5400      42.1        39       137        60
OIR    2025130    131400  -10.4100 -136.5500      42.1        39       137        60
OIR    2025130    131400  -10.4100 -136.5600      42.0        39       138        60
OIR    2025130    131400  -10.4100 -136.5700      42.0        39       139        60
OIR    2025130    131400  -10.4100 -136.5800      42.0        39       139        60
OIR    2025130    131400  -10.4100 -136.5900      42.0        39       141        60
OIR    2025130    131400  -10.4100 -136.6000      42.0        39       144        60
OIR    2025130    131400  -10.4100 -136.6100      41.9        39       142        60
OIR    2025130    131400  -10.4100 -136.6200      41.8        39       140        60
OIR    2025130    131400  -10.4100 -136.6300      41.7        39       137        60
OIR    2025130    131400  -10.4100 -136.6400      41.7        39       136        60
OIR    2025130    131400  -10.4100 -136.6500      41.6        39       137        60
OIR    2025130    131400  -10.4100 -136.6600      41.6        39       137        60
OIR    2025130    131400  -10.4100 -136.6700      41.6        39       139        60
OIR    2025130    131400  -10.4100 -136.6800      41.6        38       142        60
OIR    2025130    131400  -10.4100 -136.6900      41.7        38       147        60
OIR    2025130    131400  -10.4100 -136.7000      41.7        38       147        60
OIR    2025130    131400  -10.4100 -136.7100      41.7        38       148        60
OIR    2025130    131400  -10.4100 -136.7200      41.5        38       145        60
OIR    2025130    131400  -10.4100 -136.7300      41.4        37       142        60
OIR    2025130    131400  -10.4100 -136.7400      41.2        37       139        60
OIR    2025130    131400  -10.4100 -136.7500      41.0        37       138        60
OIR    2025130    131400  -10.4100 -136.7600      40.9        36       137        60
OIR    2025130    131400  -10.4100 -136.7700      40.7        35       136        60
OIR    2025130    131400  -10.4100 -136.7800      40.8        34       137        60
OIR    2025130    131400  -10.4100 -136.7900      40.9        33       140        60
OIR    2025130    131400  -10.4100 -136.8000      41.0        33       143        60
OIR    2025130    131400  -10.4100 -136.8100      41.0        33       139        60
OIR    2025130    131400  -10.4100 -136.8200      40.9        32       134        60
OIR    2025130    131400  -10.4100 -136.8300      40.9        32       136        60
OIR    2025130    131400  -10.4100 -136.8400      40.9        32       139        60
OIR    2025130    131400  -10.4100 -136.8500      40.9        32       141        60
OIR    2025130    131400  -10.4100 -136.8600      40.9        32       141        60
OIR    2025130    131400  -10.4100 -136.8700      40.8        31       137        60
OIR    2025130    131400  -10.4100 -136.8800      40.8        30       134        60
OIR    2025130    131400  -10.4100 -136.8900      40.8        30       130        60
OIR    2025130    131400  -10.4100 -136.9000      40.9        30       129        60
OIR    2025130    131400  -10.4100 -136.9100      40.9        30       128        60
OIR    2025130    131400  -10.4100 -136.9200      41.1        30       129        60
OIR    2025130    131400  -10.4100 -136.9300      41.2        30       131        60
OIR    2025130    131400  -10.4100 -136.9400      41.3        29       134        60
OIR    2025130    131400  -10.4100 -136.9500      41.2        29       138        60
OIR    2025130    131400  -10.4100 -136.9600      41.1        28       143        60
OIR    2025130    131400  -10.4100 -136.9700      40.9        27       148        60
OIR    2025130    131400  -10.4100 -136.9800      41.0        27       147        60
OIR    2025130    131400  -10.4100 -136.9900      40.4        26       144        60
OIR    2025130    131400  -10.4100 -137.0000      38.8        23       138        60
OIR    2025130    131400  -10.4100 -137.0100      38.2        22       136        60
OIR    2025130    131400  -10.4100 -137.0200      38.2        21       138        60
OIR    2025130    131400  -10.4100 -137.0300      38.2        21       135        60
OIR    2025130    131400  -10.4100 -137.0400      38.3        21       127        60
OIR    2025130    131400  -10.4100 -137.0500      38.4        20       120        60
OIR    2025130    131400  -10.4100 -137.0600      38.7        20       114        60
OIR    2025130    131400  -10.4100 -137.0700      38.8        20       115        60
OIR    2025130    131400  -10.4100 -137.0800      38.8        19       116        60
OIR    2025130    131400  -10.4100 -137.0900      38.8        19       113        60
OIR    2025130    131400  -10.4100 -137.1000      38.8        19       110        60
OIR    2025130    131400  -10.4100 -137.1100      38.8        19       109        60
OIR    2025130    131400  -10.4100 -137.1200      38.9        19       108        60
OIR    2025130    131400  -10.4100 -137.1300      38.9        19       108        60
OIR    2025130    131400  -10.4100 -137.1400      38.9        19       107        60
OIR    2025130    131400  -10.4100 -137.1500      38.9        18       104        60
OIR    2025130    131400  -10.4100 -137.1600      38.8        18       104        60
OIR    2025130    131400  -10.4100 -137.1700      38.7        18       104        60
OIR    2025130    131400  -10.4100 -137.1800      38.6        18       104        60
OIR    2025130    131400  -10.4100 -137.1900      38.5        18       104        60
OIR    2025130    131400  -10.4100 -137.2000      38.4        18       110        60
OIR    2025130    131400  -10.4100 -137.2100      38.3        17       115        60
OIR    2025130    131400  -10.4100 -137.2200      38.2        17       116        60
OIR    2025130    131400  -10.4100 -137.2300      37.6        16       116        60
OIR    2025130    131400  -10.4100 -137.2400      37.5        16       116        60
OIR    2025130    131400  -10.4100 -137.2500      37.5        16       115        60
OIR    2025130    131400  -10.4100 -137.2600      37.3        16       115        60
OIR    2025130    131400  -10.4100 -137.2700      36.9        16       114        60
OIR    2025130    131400  -10.4100 -137.2800      36.0        15       113        60
OIR    2025130    131400  -10.4100 -137.2900      35.0        14       114        60
OIR    2025130    131400  -10.4100 -137.3000      34.2        12       115        60
OIR    2025130    131400  -10.4100 -137.3100      33.9        12       114        60
OIR    2025130    131400  -10.4100 -137.3200      33.8        11       113        60
OIR    2025130    131400  -10.4100 -137.3300      33.8        11       113        60
OIR    2025130    131400  -10.4100 -137.3400      33.7        11       111        60
OIR    2025130    131400  -10.4100 -137.3500      33.3        10       109        60
OIR    2025130    131400  -10.4100 -137.3600      32.6         9       108        60
OIR    2025130    131400  -10.4100 -137.3700      32.2         7       108        60
OIR    2025130    131400  -10.4100 -137.3800      31.9         5       109        60
OIR    2025130    131400  -10.4100 -137.3900      31.8         4       111        60
OIR    2025130    131400  -10.4100 -137.4000      31.8         4       108        60
OIR    2025130    131400  -10.4100 -137.4100      31.8         4       104        60
OIR    2025130    131400  -10.4100 -137.4200      31.8         4       107        60
OIR    2025130    131400  -10.4100 -137.4300      31.8         4       108        60
OIR    2025130    131400  -10.4100 -137.4400      31.8         4       108        60
OIR    2025130    131400  -10.4100 -137.4500      31.8         4       108        60
OIR    2025130    131400  -10.4100 -137.4600      31.8         4       105        60
OIR    2025130    131400  -10.4100 -137.4700      31.8         4       105        60
OIR    2025130    131400  -10.4100 -137.4800      31.8         4       108        60
OIR    2025130    131400  -10.4100 -137.4900      31.8         4       109        60
OIR    2025130    131400  -10.4100 -137.5000      31.8         4       110        60
OIR    2025130    131400  -10.4100 -137.5100      31.8         4       110        60
OIR    2025130    131400  -10.4100 -137.5200      31.8         4       110        60
OIR    2025130    131400  -10.4100 -137.5300      31.8         4       111        60
OIR    2025130    131400  -10.4100 -137.5400      31.8         4       111        60
OIR    2025130    131400  -10.4100 -137.5500      31.8         4       112        60
OIR    2025130    131400  -10.4100 -137.5600      31.8         4       112        60
OIR    2025130    131400  -10.4100 -137.5700      31.8         4       114        60
OIR    2025130    131400  -10.4100 -137.5800      31.8         4       114        60
OIR    2025130    131400  -10.4100 -137.5900      31.8         4       114        60
OIR    2025130    131400  -10.4100 -137.6000      31.7         4       115        60
OIR    2025130    131400  -10.4100 -137.6100      31.7         4       115        60
OIR    2025130    131400  -10.4100 -137.6200      31.7         4       117        60
OIR    2025130    131400  -10.4100 -137.6300      31.7         4       121        60
OIR    2025130    131400  -10.4100 -137.6400      31.6         4       122        60
OIR    2025130    131400  -10.4100 -137.6500      31.6         4       124        60
OIR    2025130    131400  -10.4100 -137.6600      31.6         4       125        60
OIR    2025130    131400  -10.4100 -137.6700      31.6         4       127        60
OIR    2025130    131400  -10.4100 -137.6800      31.5         4       130        60
OIR    2025130    131400  -10.4100 -137.6900      31.5         4       133        60
OIR    2025130    131400  -10.4100 -137.7000      31.5         4       136        60
OIR    2025130    131400  -10.4100 -137.7100      31.4         4       140        60
OIR    2025130    131400  -10.4100 -137.7200      31.0         4       143        60
OIR    2025130    131400  -10.4100 -137.7300      28.1         3       143        60
OIR    2025130    131400  -10.4100 -137.7400      24.7         0       142        60
OIR    2025130    131400  -10.4100 -137.7500      23.2       359       142        60
OIR    2025130    131400  -10.4100 -137.7600      21.2       358       141        60
OIR    2025130    131400  -10.4100 -137.7700      20.3       357       141        60
OIR    2025130    131400  -10.4100 -137.7800      20.0       357       140        60
OIR    2025130    131400  -10.4100 -137.7900      19.9       357       141        60
OIR    2025130    131400  -10.4100 -137.8000      19.8       357       141        60
OIR    2025130    131400  -10.4100 -137.8100      19.7       357       142        60
OIR    2025130    131400  -10.4100 -137.8200      19.6       357       143        60
OIR    2025130    131400  -10.4100 -137.8300      19.5       357       144        60
OIR    2025130    131400  -10.4100 -137.8400      19.4       356       144        60
OIR    2025130    131400  -10.4100 -137.8500      19.2       357       144        60
OIR    2025130    131400  -10.4100 -137.8600      19.0       356       141        60
OIR    2025130    131400  -10.4100 -137.8700      18.7       356       140        60
OIR    2025130    131400  -10.4100 -137.8800      18.4       356       144        60
OIR    2025130    131400  -10.4100 -137.8900      18.3       356       147        60
OIR    2025130    131400  -10.4100 -137.9000      18.2       356       147        60
OIR    2025130    131400  -10.4100 -137.9100      18.2       356       148        60
OIR    2025130    131400  -10.4100 -137.9200      18.2       356       149        60
OIR    2025130    131400  -10.4100 -137.9600      18.2       356       148        60
OIR    2025130    131400  -10.4100 -137.9700      18.2       356       148        60
OIR    2025130    131400  -10.4100 -137.9800      18.3       356       150        60
OIR    2025130    131400  -10.4100 -138.0500      23.8       352       146        60
OIR    2025130    131400  -10.4100 -138.0600      24.0       351       143        60
OIR    2025130    131400  -10.4100 -138.0700      24.1       350       141        60
OIR    2025130    131400  -10.4100 -138.0800      24.1       349       138        60
OIR    2025130    131400  -10.4100 -138.0900      24.2       348       136        60
OIR    2025130    131400  -10.4100 -138.1000      24.2       348       137        60
OIR    2025130    131400  -10.4100 -138.1100      24.4       348       137        60
OIR    2025130    131400  -10.4100 -138.1200      24.6       348       134        60
OIR    2025130    131400  -10.4100 -138.1300      24.8       348       133        60
OIR    2025130    131400  -10.4100 -138.1400      25.2       348       135        60
OIR    2025130    131400  -10.4100 -138.1500      25.9       348       133        60
OIR    2025130    131400  -10.4100 -138.1600      26.5       348       131        60
OIR    2025130    131400  -10.4100 -138.1700      27.0       348       129        60
OIR    2025130    131400  -10.4100 -138.1800      27.6       349       128        60
OIR    2025130    131400  -10.4100 -138.1900      28.2       350       130        60
OIR    2025130    131400  -10.4100 -138.2000      28.7       350       132        60
OIR    2025130    131400  -10.4100 -138.2100      29.1       350       131        60
OIR    2025130    131400  -10.4100 -138.2200      29.4       350       131        60
OIR    2025130    131400  -10.4100 -138.2300      29.5       350       133        60
OIR    2025130    131400  -10.4100 -138.2400      29.6       350       135        60
OIR    2025130    131400  -10.4100 -138.2500      29.5       349       137        60
OIR    2025130    131400  -10.4100 -138.2600      29.7       349       138        60
OIR    2025130    131400  -10.4100 -138.2700      29.7       349       138        60
OIR    2025130    131400  -10.4100 -138.2800      29.5       349       136        60
OIR    2025130    131400  -10.4100 -138.2900      29.2       349       133        60
OIR    2025130    131400  -10.4100 -138.3000      28.8       351       132        60
OIR    2025130    131400  -10.4100 -138.3100      28.6       351       130        60
OIR    2025130    131400  -10.4100 -138.3200      28.5       352       131        60
OIR    2025130    131400  -10.4100 -138.3300      28.6       352       133        60
OIR    2025130    131400  -10.4100 -138.3400      28.7       352       135        60
OIR    2025130    131400  -10.4100 -138.3500      28.7       352       136        60
OIR    2025130    131400  -10.4100 -138.3600      28.6       351       136        60
OIR    2025130    131400  -10.4100 -138.3700      28.5       352       139        60
OIR    2025130    131400  -10.4100 -138.3800      28.4       352       145        60
OIR    2025130    131400  -10.4100 -138.3900      28.3       352       149        60
OIR    2025130    131400  -10.4200 -136.3100      41.4        41       148        60
OIR    2025130    131400  -10.4200 -136.3200      41.5        41       143        60
OIR    2025130    131400  -10.4200 -136.3300      41.6        40       139        60
OIR    2025130    131400  -10.4200 -136.3400      41.7        40       136        60
OIR    2025130    131400  -10.4200 -136.3500      41.7        40       136        60
OIR    2025130    131400  -10.4200 -136.3600      41.8        40       139        60
OIR    2025130    131400  -10.4200 -136.3700      41.8        40       137        60
OIR    2025130    131400  -10.4200 -136.3800      41.8        40       135        60
OIR    2025130    131400  -10.4200 -136.3900      41.8        40       135        60
OIR    2025130    131400  -10.4200 -136.4000      41.8        40       134        60
OIR    2025130    131400  -10.4200 -136.4100      41.8        40       136        60
OIR    2025130    131400  -10.4200 -136.4200      41.9        40       136        60
OIR    2025130    131400  -10.4200 -136.4300      42.0        40       133        60
OIR    2025130    131400  -10.4200 -136.4400      42.1        40       133        60
OIR    2025130    131400  -10.4200 -136.4500      42.1        40       135        60
OIR    2025130    131400  -10.4200 -136.4600      42.1        40       135        60
OIR    2025130    131400  -10.4200 -136.4700      42.1        40       135        60
OIR    2025130    131400  -10.4200 -136.4800      42.1        39       137        60
OIR    2025130    131400  -10.4200 -136.4900      42.1        39       138        60
OIR    2025130    131400  -10.4200 -136.5000      42.1        39       139        60
OIR    2025130    131400  -10.4200 -136.5100      42.1        39       139        60
OIR    2025130    131400  -10.4200 -136.5200      42.1        39       142        60
OIR    2025130    131400  -10.4200 -136.5300      42.1        39       143        60
OIR    2025130    131400  -10.4200 -136.5400      42.1        39       143        60
OIR    2025130    131400  -10.4200 -136.5500      42.1        39       142        60
OIR    2025130    131400  -10.4200 -136.5600      42.0        39       141        60
OIR    2025130    131400  -10.4200 -136.5700      42.0        39       140        60
OIR    2025130    131400  -10.4200 -136.5800      42.0        39       139        60
OIR    2025130    131400  -10.4200 -136.5900      42.0        39       141        60
OIR    2025130    131400  -10.4200 -136.6000      42.0        39       144        60
OIR    2025130    131400  -10.4200 -136.6100      41.9        39       143        60
OIR    2025130    131400  -10.4200 -136.6200      41.9        39       142        60
OIR    2025130    131400  -10.4200 -136.6300      41.9        39       139        60
OIR    2025130    131400  -10.4200 -136.6400      41.8        39       138        60
OIR    2025130    131400  -10.4200 -136.6500      41.8        39       138        60
OIR    2025130    131400  -10.4200 -136.6600      41.7        39       139        60
OIR    2025130    131400  -10.4200 -136.6700      41.7        38       140        60
OIR    2025130    131400  -10.4200 -136.6800      41.8        38       142        60
OIR    2025130    131400  -10.4200 -136.6900      41.9        38       143        60
OIR    2025130    131400  -10.4200 -136.7000      41.9        38       143        60
OIR    2025130    131400  -10.4200 -136.7100      41.9        38       143        60
OIR    2025130    131400  -10.4200 -136.7200      41.8        37       143        60
OIR    2025130    131400  -10.4200 -136.7300      41.7        37       143        60
OIR    2025130    131400  -10.4200 -136.7400      41.5        37       140        60
OIR    2025130    131400  -10.4200 -136.7500      41.2        36       139        60
OIR    2025130    131400  -10.4200 -136.7600      41.1        35       138        60
OIR    2025130    131400  -10.4200 -136.7700      40.9        34       137        60
OIR    2025130    131400  -10.4200 -136.7800      41.0        33       137        60
OIR    2025130    131400  -10.4200 -136.7900      41.1        33       138        60
OIR    2025130    131400  -10.4200 -136.8000      41.1        33       140        60
OIR    2025130    131400  -10.4200 -136.8100      41.1        32       137        60
OIR    2025130    131400  -10.4200 -136.8200      41.1        32       133        60
OIR    2025130    131400  -10.4200 -136.8300      41.1        32       134        60
OIR    2025130    131400  -10.4200 -136.8400      41.0        32       137        60
OIR    2025130    131400  -10.4200 -136.8500      41.0        32       136        60
OIR    2025130    131400  -10.4200 -136.8600      41.0        31       135        60
OIR    2025130    131400  -10.4200 -136.8700      41.0        31       133        60
OIR    2025130    131400  -10.4200 -136.8800      40.8        30       131        60
OIR    2025130    131400  -10.4200 -136.8900      40.8        30       130        60
OIR    2025130    131400  -10.4200 -136.9000      40.8        30       128        60
OIR    2025130    131400  -10.4200 -136.9100      40.9        30       127        60
OIR    2025130    131400  -10.4200 -136.9200      41.1        30       128        60
OIR    2025130    131400  -10.4200 -136.9300      41.2        29       130        60
OIR    2025130    131400  -10.4200 -136.9400      41.3        29       133        60
OIR    2025130    131400  -10.4200 -136.9500      41.3        29       137        60
OIR    2025130    131400  -10.4200 -136.9600      41.2        28       142        60
OIR    2025130    131400  -10.4200 -136.9700      41.1        27       146        60
OIR    2025130    131400  -10.4200 -136.9800      41.3        27       147        60
OIR    2025130    131400  -10.4200 -136.9900      41.1        26       147        60
OIR    2025130    131400  -10.4200 -137.0000      38.9        24       142        60
OIR    2025130    131400  -10.4200 -137.0100      38.3        22       140        60
OIR    2025130    131400  -10.4200 -137.0200      38.2        21       139        60
OIR    2025130    131400  -10.4200 -137.0300      38.4        20       133        60
OIR    2025130    131400  -10.4200 -137.0400      38.5        20       124        60
OIR    2025130    131400  -10.4200 -137.0500      38.6        20       116        60
OIR    2025130    131400  -10.4200 -137.0600      38.8        20       112        60
OIR    2025130    131400  -10.4200 -137.0700      38.8        20       115        60
OIR    2025130    131400  -10.4200 -137.0800      38.9        19       116        60
OIR    2025130    131400  -10.4200 -137.0900      38.8        19       115        60
OIR    2025130    131400  -10.4200 -137.1000      38.8        19       113        60
OIR    2025130    131400  -10.4200 -137.1100      38.8        19       110        60
OIR    2025130    131400  -10.4200 -137.1200      38.8        19       109        60
OIR    2025130    131400  -10.4200 -137.1300      38.9        19       108        60
OIR    2025130    131400  -10.4200 -137.1400      38.9        19       107        60
OIR    2025130    131400  -10.4200 -137.1500      38.9        19       104        60
OIR    2025130    131400  -10.4200 -137.1600      38.8        18       103        60
OIR    2025130    131400  -10.4200 -137.1700      38.8        18       103        60
OIR    2025130    131400  -10.4200 -137.1800      38.7        18       104        60
OIR    2025130    131400  -10.4200 -137.1900      38.5        18       104        60
OIR    2025130    131400  -10.4200 -137.2000      38.4        18       110        60
OIR    2025130    131400  -10.4200 -137.2100      38.2        17       116        60
OIR    2025130    131400  -10.4200 -137.2200      38.1        17       119        60
OIR    2025130    131400  -10.4200 -137.2300      37.6        16       120        60
OIR    2025130    131400  -10.4200 -137.2400      37.4        16       119        60
OIR    2025130    131400  -10.4200 -137.2500      37.3        16       119        60
OIR    2025130    131400  -10.4200 -137.2600      37.1        16       119        60
OIR    2025130    131400  -10.4200 -137.2700      36.4        15       116        60
OIR    2025130    131400  -10.4200 -137.2800      35.3        14       115        60
OIR    2025130    131400  -10.4200 -137.2900      34.4        13       116        60
OIR    2025130    131400  -10.4200 -137.3000      33.8        12       116        60
OIR    2025130    131400  -10.4200 -137.3100      33.4        11       115        60
OIR    2025130    131400  -10.4200 -137.3200      33.2        10       113        60
OIR    2025130    131400  -10.4200 -137.3300      33.1        10       112        60
OIR    2025130    131400  -10.4200 -137.3400      33.0        10       111        60
OIR    2025130    131400  -10.4200 -137.3500      32.7         9       110        60
OIR    2025130    131400  -10.4200 -137.3600      32.2         7       110        60
OIR    2025130    131400  -10.4200 -137.3700      32.0         6       109        60
OIR    2025130    131400  -10.4200 -137.3800      31.9         5       110        60
OIR    2025130    131400  -10.4200 -137.3900      31.8         4       110        60
OIR    2025130    131400  -10.4200 -137.4000      31.8         4       108        60
OIR    2025130    131400  -10.4200 -137.4100      31.8         4       105        60
OIR    2025130    131400  -10.4200 -137.4200      31.8         4       105        60
OIR    2025130    131400  -10.4200 -137.4300      31.8         4       107        60
OIR    2025130    131400  -10.4200 -137.4400      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.4500      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.4600      31.8         4       108        60
OIR    2025130    131400  -10.4200 -137.4700      31.8         4       108        60
OIR    2025130    131400  -10.4200 -137.4800      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.4900      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.5000      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.5100      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.5200      31.8         4       109        60
OIR    2025130    131400  -10.4200 -137.5300      31.8         4       110        60
OIR    2025130    131400  -10.4200 -137.5400      31.8         4       111        60
OIR    2025130    131400  -10.4200 -137.5500      31.8         4       111        60
OIR    2025130    131400  -10.4200 -137.5600      31.8         4       111        60
OIR    2025130    131400  -10.4200 -137.5700      31.9         4       113        60
OIR    2025130    131400  -10.4200 -137.5800      31.9         4       114        60
OIR    2025130    131400  -10.4200 -137.5900      31.9         4       116        60
OIR    2025130    131400  -10.4200 -137.6000      31.9         4       116        60
OIR    2025130    131400  -10.4200 -137.6100      31.9         4       117        60
OIR    2025130    131400  -10.4200 -137.6200      31.8         4       119        60
OIR    2025130    131400  -10.4200 -137.6300      31.7         4       121        60
OIR    2025130    131400  -10.4200 -137.6400      31.7         4       122        60
OIR    2025130    131400  -10.4200 -137.6500      31.6         4       123        60
OIR    2025130    131400  -10.4200 -137.6600      31.6         4       124        60
OIR    2025130    131400  -10.4200 -137.6700      31.6         4       126        60
OIR    2025130    131400  -10.4200 -137.6800      31.5         4       129        60
OIR    2025130    131400  -10.4200 -137.6900      31.5         4       132        60
OIR    2025130    131400  -10.4200 -137.7000      31.5         4       135        60
OIR    2025130    131400  -10.4200 -137.7100      31.3         4       138        60
OIR    2025130    131400  -10.4200 -137.7200      30.6         4       141        60
OIR    2025130    131400  -10.4200 -137.7300      27.7         3       141        60
OIR    2025130    131400  -10.4200 -137.7400      24.5         0       140        60
OIR    2025130    131400  -10.4200 -137.7500      22.9       359       139        60
OIR    2025130    131400  -10.4200 -137.7600      21.2       358       138        60
OIR    2025130    131400  -10.4200 -137.7700      20.4       358       138        60
OIR    2025130    131400  -10.4200 -137.7800      20.1       357       138        60
OIR    2025130    131400  -10.4200 -137.7900      19.9       357       139        60
OIR    2025130    131400  -10.4200 -137.8000      19.8       357       140        60
OIR    2025130    131400  -10.4200 -137.8100      19.7       357       140        60
OIR    2025130    131400  -10.4200 -137.8200      19.6       357       141        60
OIR    2025130    131400  -10.4200 -137.8300      19.5       357       142        60
OIR    2025130    131400  -10.4200 -137.8400      19.3       357       143        60
OIR    2025130    131400  -10.4200 -137.8500      19.1       357       145        60
OIR    2025130    131400  -10.4200 -137.8600      18.8       357       143        60
OIR    2025130    131400  -10.4200 -137.8700      18.6       356       142        60
OIR    2025130    131400  -10.4200 -137.8800      18.4       356       142        60
OIR    2025130    131400  -10.4200 -137.8900      18.3       356       142        60
OIR    2025130    131400  -10.4200 -137.9000      18.2       356       142        60
OIR    2025130    131400  -10.4200 -137.9100      18.2       356       142        60
OIR    2025130    131400  -10.4200 -137.9200      18.2       356       142        60
OIR    2025130    131400  -10.4200 -137.9300      18.2       356       144        60
OIR    2025130    131400  -10.4200 -137.9400      18.2       356       147        60
OIR    2025130    131400  -10.4200 -137.9500      18.2       356       146        60
OIR    2025130    131400  -10.4200 -137.9600      18.2       356       143        60
OIR    2025130    131400  -10.4200 -137.9700      18.2       356       144        60
OIR    2025130    131400  -10.4200 -137.9800      18.2       356       147        60
OIR    2025130    131400  -10.4200 -138.0600      23.7       352       147        60
OIR    2025130    131400  -10.4200 -138.0700      23.8       351       143        60
OIR    2025130    131400  -10.4200 -138.0800      23.8       349       139        60
OIR    2025130    131400  -10.4200 -138.0900      23.9       348       136        60
OIR    2025130    131400  -10.4200 -138.1000      23.8       348       136        60
OIR    2025130    131400  -10.4200 -138.1100      23.8       348       135        60
OIR    2025130    131400  -10.4200 -138.1200      24.0       348       132        60
OIR    2025130    131400  -10.4200 -138.1300      24.5       348       131        60
OIR    2025130    131400  -10.4200 -138.1400      25.0       348       132        60
OIR    2025130    131400  -10.4200 -138.1500      25.6       348       131        60
OIR    2025130    131400  -10.4200 -138.1600      26.2       348       130        60
OIR    2025130    131400  -10.4200 -138.1700      26.7       349       129        60
OIR    2025130    131400  -10.4200 -138.1800      27.5       350       128        60
OIR    2025130    131400  -10.4200 -138.1900      28.3       350       129        60
OIR    2025130    131400  -10.4200 -138.2000      28.6       351       130        60
OIR    2025130    131400  -10.4200 -138.2100      28.9       351       130        60
OIR    2025130    131400  -10.4200 -138.2200      29.1       351       130        60
OIR    2025130    131400  -10.4200 -138.2300      29.1       351       130        60
OIR    2025130    131400  -10.4200 -138.2400      29.1       351       132        60
OIR    2025130    131400  -10.4200 -138.2500      29.0       351       135        60
OIR    2025130    131400  -10.4200 -138.2600      29.1       351       135        60
OIR    2025130    131400  -10.4200 -138.2700      29.0       351       135        60
OIR    2025130    131400  -10.4200 -138.2800      28.8       351       133        60
OIR    2025130    131400  -10.4200 -138.2900      28.6       352       131        60
OIR    2025130    131400  -10.4200 -138.3000      28.5       352       131        60
OIR    2025130    131400  -10.4200 -138.3100      28.5       352       131        60
OIR    2025130    131400  -10.4200 -138.3200      28.5       352       132        60
OIR    2025130    131400  -10.4200 -138.3300      28.5       352       134        60
OIR    2025130    131400  -10.4200 -138.3400      28.5       352       135        60
OIR    2025130    131400  -10.4200 -138.3500      28.5       352       138        60
OIR    2025130    131400  -10.4200 -138.3600      28.5       352       142        60
OIR    2025130    131400  -10.4200 -138.3700      28.4       352       145        60
OIR    2025130    131400  -10.4200 -138.3800      28.4       352       148        60
OIR    2025130    131400  -10.4300 -136.3200      41.4        41       146        60
OIR    2025130    131400  -10.4300 -136.3300      41.5        40       142        60
OIR    2025130    131400  -10.4300 -136.3400      41.5        40       139        60
OIR    2025130    131400  -10.4300 -136.3500      41.5        40       141        60
OIR    2025130    131400  -10.4300 -136.3600      41.6        40       145        60
OIR    2025130    131400  -10.4300 -136.3700      41.6        40       142        60
OIR    2025130    131400  -10.4300 -136.3800      41.6        40       138        60
OIR    2025130    131400  -10.4300 -136.3900      41.6        40       136        60
OIR    2025130    131400  -10.4300 -136.4000      41.7        40       134        60
OIR    2025130    131400  -10.4300 -136.4100      41.7        40       137        60
OIR    2025130    131400  -10.4300 -136.4200      41.7        40       138        60
OIR    2025130    131400  -10.4300 -136.4300      41.8        40       137        60
OIR    2025130    131400  -10.4300 -136.4400      41.9        40       136        60
OIR    2025130    131400  -10.4300 -136.4500      41.9        39       136        60
OIR    2025130    131400  -10.4300 -136.4600      41.9        39       136        60
OIR    2025130    131400  -10.4300 -136.4700      41.9        39       136        60
OIR    2025130    131400  -10.4300 -136.4800      41.9        39       137        60
OIR    2025130    131400  -10.4300 -136.4900      42.0        39       138        60
OIR    2025130    131400  -10.4300 -136.5000      42.1        39       142        60
OIR    2025130    131400  -10.4300 -136.5100      42.1        39       146        60
OIR    2025130    131400  -10.4300 -136.5200      42.1        39       148        60
OIR    2025130    131400  -10.4300 -136.5300      42.1        39       149        60
OIR    2025130    131400  -10.4300 -136.5400      42.1        39       148        60
OIR    2025130    131400  -10.4300 -136.5500      42.1        39       146        60
OIR    2025130    131400  -10.4300 -136.5600      42.0        39       145        60
OIR    2025130    131400  -10.4300 -136.5700      42.0        39       142        60
OIR    2025130    131400  -10.4300 -136.5800      42.0        39       139        60
OIR    2025130    131400  -10.4300 -136.5900      42.0        39       141        60
OIR    2025130    131400  -10.4300 -136.6000      42.0        39       144        60
OIR    2025130    131400  -10.4300 -136.6100      42.0        39       144        60
OIR    2025130    131400  -10.4300 -136.6200      41.9        39       144        60
OIR    2025130    131400  -10.4300 -136.6300      41.9        39       141        60
OIR    2025130    131400  -10.4300 -136.6400      41.9        39       139        60
OIR    2025130    131400  -10.4300 -136.6500      41.8        39       140        60
OIR    2025130    131400  -10.4300 -136.6600      41.8        38       140        60
OIR    2025130    131400  -10.4300 -136.6700      41.9        38       141        60
OIR    2025130    131400  -10.4300 -136.6800      41.9        38       140        60
OIR    2025130    131400  -10.4300 -136.6900      41.9        38       138        60
OIR    2025130    131400  -10.4300 -136.7000      41.9        38       137        60
OIR    2025130    131400  -10.4300 -136.7100      41.9        38       136        60
OIR    2025130    131400  -10.4300 -136.7200      41.9        37       140        60
OIR    2025130    131400  -10.4300 -136.7300      41.8        37       145        60
OIR    2025130    131400  -10.4300 -136.7400      41.7        37       141        60
OIR    2025130    131400  -10.4300 -136.7500      41.3        35       139        60
OIR    2025130    131400  -10.4300 -136.7600      41.2        35       137        60
OIR    2025130    131400  -10.4300 -136.7700      41.1        34       136        60
OIR    2025130    131400  -10.4300 -136.7800      41.1        33       136        60
OIR    2025130    131400  -10.4300 -136.7900      41.2        33       136        60
OIR    2025130    131400  -10.4300 -136.8000      41.2        32       137        60
OIR    2025130    131400  -10.4300 -136.8100      41.2        32       135        60
OIR    2025130    131400  -10.4300 -136.8200      41.1        32       132        60
OIR    2025130    131400  -10.4300 -136.8300      41.1        32       133        60
OIR    2025130    131400  -10.4300 -136.8400      41.1        32       134        60
OIR    2025130    131400  -10.4300 -136.8500      41.1        31       129        60
OIR    2025130    131400  -10.4300 -136.8600      41.0        31       127        60
OIR    2025130    131400  -10.4300 -136.8700      40.9        31       127        60
OIR    2025130    131400  -10.4300 -136.8800      40.9        30       128        60
OIR    2025130    131400  -10.4300 -136.8900      40.8        30       129        60
OIR    2025130    131400  -10.4300 -136.9000      40.8        30       128        60
OIR    2025130    131400  -10.4300 -136.9100      40.9        30       125        60
OIR    2025130    131400  -10.4300 -136.9200      41.1        29       126        60
OIR    2025130    131400  -10.4300 -136.9300      41.2        29       127        60
OIR    2025130    131400  -10.4300 -136.9400      41.3        29       131        60
OIR    2025130    131400  -10.4300 -136.9500      41.3        29       135        60
OIR    2025130    131400  -10.4300 -136.9600      41.3        28       139        60
OIR    2025130    131400  -10.4300 -136.9700      41.3        27       143        60
OIR    2025130    131400  -10.4300 -136.9800      41.4        27       147        60
OIR    2025130    131400  -10.4300 -137.0000      39.3        24       147        60
OIR    2025130    131400  -10.4300 -137.0100      38.4        22       143        60
OIR    2025130    131400  -10.4300 -137.0200      38.4        21       138        60
OIR    2025130    131400  -10.4300 -137.0300      38.7        20       129        60
OIR    2025130    131400  -10.4300 -137.0400      38.7        20       119        60
OIR    2025130    131400  -10.4300 -137.0500      38.7        20       114        60
OIR    2025130    131400  -10.4300 -137.0600      38.9        20       110        60
OIR    2025130    131400  -10.4300 -137.0700      38.9        19       114        60
OIR    2025130    131400  -10.4300 -137.0800      38.9        19       117        60
OIR    2025130    131400  -10.4300 -137.0900      38.9        19       117        60
OIR    2025130    131400  -10.4300 -137.1000      38.9        19       116        60
OIR    2025130    131400  -10.4300 -137.1100      38.8        19       112        60
OIR    2025130    131400  -10.4300 -137.1200      38.8        19       110        60
OIR    2025130    131400  -10.4300 -137.1300      38.8        19       109        60
OIR    2025130    131400  -10.4300 -137.1400      38.8        19       107        60
OIR    2025130    131400  -10.4300 -137.1500      38.8        19       104        60
OIR    2025130    131400  -10.4300 -137.1600      38.8        18       104        60
OIR    2025130    131400  -10.4300 -137.1700      38.7        18       103        60
OIR    2025130    131400  -10.4300 -137.1800      38.6        18       104        60
OIR    2025130    131400  -10.4300 -137.1900      38.5        18       104        60
OIR    2025130    131400  -10.4300 -137.2000      38.2        18       111        60
OIR    2025130    131400  -10.4300 -137.2100      38.1        17       116        60
OIR    2025130    131400  -10.4300 -137.2200      38.0        17       122        60
OIR    2025130    131400  -10.4300 -137.2300      37.5        16       124        60
OIR    2025130    131400  -10.4300 -137.2400      37.1        16       124        60
OIR    2025130    131400  -10.4300 -137.2500      36.9        16       124        60
OIR    2025130    131400  -10.4300 -137.2600      36.5        15       124        60
OIR    2025130    131400  -10.4300 -137.2700      35.5        14       120        60
OIR    2025130    131400  -10.4300 -137.2800      34.4        13       116        60
OIR    2025130    131400  -10.4300 -137.2900      33.7        12       116        60
OIR    2025130    131400  -10.4300 -137.3000      33.2        11       116        60
OIR    2025130    131400  -10.4300 -137.3100      32.9        10       115        60
OIR    2025130    131400  -10.4300 -137.3200      32.8        10       113        60
OIR    2025130    131400  -10.4300 -137.3300      32.6         9       111        60
OIR    2025130    131400  -10.4300 -137.3400      32.4         9       111        60
OIR    2025130    131400  -10.4300 -137.3500      32.1         8       111        60
OIR    2025130    131400  -10.4300 -137.3600      31.9         6       111        60
OIR    2025130    131400  -10.4300 -137.3700      31.8         5       110        60
OIR    2025130    131400  -10.4300 -137.3800      31.8         5       109        60
OIR    2025130    131400  -10.4300 -137.3900      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.4000      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.4100      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.4200      31.8         4       105        60
OIR    2025130    131400  -10.4300 -137.4300      31.8         4       105        60
OIR    2025130    131400  -10.4300 -137.4400      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.4500      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.4600      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.4700      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.4800      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.4900      31.8         4       109        60
OIR    2025130    131400  -10.4300 -137.5000      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.5100      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.5200      31.8         4       107        60
OIR    2025130    131400  -10.4300 -137.5300      31.8         4       110        60
OIR    2025130    131400  -10.4300 -137.5400      31.8         4       111        60
OIR    2025130    131400  -10.4300 -137.5500      31.8         4       111        60
OIR    2025130    131400  -10.4300 -137.5600      31.9         4       111        60
OIR    2025130    131400  -10.4300 -137.5700      32.0         4       112        60
OIR    2025130    131400  -10.4300 -137.5800      32.1         3       114        60
OIR    2025130    131400  -10.4300 -137.5900      32.2         3       117        60
OIR    2025130    131400  -10.4300 -137.6000      32.2         3       119        60
OIR    2025130    131400  -10.4300 -137.6100      32.2         3       121        60
OIR    2025130    131400  -10.4300 -137.6200      32.0         3       120        60
OIR    2025130    131400  -10.4300 -137.6300      31.8         4       119        60
OIR    2025130    131400  -10.4300 -137.6400      31.7         4       120        60
OIR    2025130    131400  -10.4300 -137.6500      31.7         4       121        60
OIR    2025130    131400  -10.4300 -137.6600      31.6         4       122        60
OIR    2025130    131400  -10.4300 -137.6700      31.6         4       124        60
OIR    2025130    131400  -10.4300 -137.6800      31.6         4       128        60
OIR    2025130    131400  -10.4300 -137.6900      31.5         4       131        60
OIR    2025130    131400  -10.4300 -137.7000      31.4         4       133        60
OIR    2025130    131400  -10.4300 -137.7100      31.3         4       136        60
OIR    2025130    131400  -10.4300 -137.7200      30.4         4       139        60
OIR    2025130    131400  -10.4300 -137.7300      27.5         3       139        60
OIR    2025130    131400  -10.4300 -137.7400      24.4         1       138        60
OIR    2025130    131400  -10.4300 -137.7500      22.8       360       136        60
OIR    2025130    131400  -10.4300 -137.7600      21.3       359       136        60
OIR    2025130    131400  -10.4300 -137.7700      20.5       358       136        60
OIR    2025130    131400  -10.4300 -137.7800      20.2       357       137        60
OIR    2025130    131400  -10.4300 -137.7900      20.0       357       138        60
OIR    2025130    131400  -10.4300 -137.8000      19.8       357       139        60
OIR    2025130    131400  -10.4300 -137.8100      19.7       357       138        60
OIR    2025130    131400  -10.4300 -137.8200      19.5       357       139        60
OIR    2025130    131400  -10.4300 -137.8300      19.4       357       140        60
OIR    2025130    131400  -10.4300 -137.8400      19.1       357       142        60
OIR    2025130    131400  -10.4300 -137.8500      18.8       357       145        60
OIR    2025130    131400  -10.4300 -137.8600      18.6       357       146        60
OIR    2025130    131400  -10.4300 -137.8700      18.5       357       144        60
OIR    2025130    131400  -10.4300 -137.8800      18.4       356       141        60
OIR    2025130    131400  -10.4300 -137.8900      18.3       356       138        60
OIR    2025130    131400  -10.4300 -137.9000      18.2       356       138        60
OIR    2025130    131400  -10.4300 -137.9100      18.2       356       137        60
OIR    2025130    131400  -10.4300 -137.9200      18.2       356       135        60
OIR    2025130    131400  -10.4300 -137.9300      18.2       356       138        60
OIR    2025130    131400  -10.4300 -137.9400      18.2       356       141        60
OIR    2025130    131400  -10.4300 -137.9500      18.2       356       141        60
OIR    2025130    131400  -10.4300 -137.9600      18.2       356       139        60
OIR    2025130    131400  -10.4300 -137.9700      18.2       356       141        60
OIR    2025130    131400  -10.4300 -137.9800      18.2       356       144        60
OIR    2025130    131400  -10.4300 -138.0700      23.6       351       145        60
OIR    2025130    131400  -10.4300 -138.0800      23.4       349       139        60
OIR    2025130    131400  -10.4300 -138.0900      23.3       348       136        60
OIR    2025130    131400  -10.4300 -138.1000      23.2       348       135        60
OIR    2025130    131400  -10.4300 -138.1100      23.3       348       134        60
OIR    2025130    131400  -10.4300 -138.1200      23.5       348       131        60
OIR    2025130    131400  -10.4300 -138.1300      23.9       348       130        60
OIR    2025130    131400  -10.4300 -138.1400      24.4       348       130        60
OIR    2025130    131400  -10.4300 -138.1500      25.1       348       129        60
OIR    2025130    131400  -10.4300 -138.1600      25.7       349       128        60
OIR    2025130    131400  -10.4300 -138.1700      26.3       349       128        60
OIR    2025130    131400  -10.4300 -138.1800      27.5       350       128        60
OIR    2025130    131400  -10.4300 -138.1900      28.2       351       129        60
OIR    2025130    131400  -10.4300 -138.2000      28.6       351       129        60
OIR    2025130    131400  -10.4300 -138.2100      28.8       351       129        60
OIR    2025130    131400  -10.4300 -138.2200      28.9       351       128        60
OIR    2025130    131400  -10.4300 -138.2300      28.9       352       128        60
OIR    2025130    131400  -10.4300 -138.2400      28.9       352       129        60
OIR    2025130    131400  -10.4300 -138.2500      28.8       352       132        60
OIR    2025130    131400  -10.4300 -138.2600      28.8       352       133        60
OIR    2025130    131400  -10.4300 -138.2700      28.8       352       133        60
OIR    2025130    131400  -10.4300 -138.2800      28.6       352       131        60
OIR    2025130    131400  -10.4300 -138.2900      28.5       352       130        60
OIR    2025130    131400  -10.4300 -138.3000      28.5       352       131        60
OIR    2025130    131400  -10.4300 -138.3100      28.4       352       131        60
OIR    2025130    131400  -10.4300 -138.3200      28.4       352       133        60
OIR    2025130    131400  -10.4300 -138.3300      28.4       352       135        60
OIR    2025130    131400  -10.4300 -138.3400      28.4       352       136        60
OIR    2025130    131400  -10.4300 -138.3500      28.4       353       141        60
OIR    2025130    131400  -10.4300 -138.3600      28.4       353       148        60
OIR    2025130    131400  -10.4300 -138.3700      28.4       353       149        60
OIR    2025130    131400  -10.4300 -138.3800      28.3       353       150        60
OIR    2025130    131400  -10.4400 -136.3200      41.3        40       148        60
OIR    2025130    131400  -10.4400 -136.3300      41.4        40       145        60
OIR    2025130    131400  -10.4400 -136.3400      41.4        40       144        60
OIR    2025130    131400  -10.4400 -136.3500      41.4        40       145        60
OIR    2025130    131400  -10.4400 -136.3600      41.4        40       147        60
OIR    2025130    131400  -10.4400 -136.3700      41.4        40       143        60
OIR    2025130    131400  -10.4400 -136.3800      41.5        40       140        60
OIR    2025130    131400  -10.4400 -136.3900      41.5        40       138        60
OIR    2025130    131400  -10.4400 -136.4000      41.5        40       136        60
OIR    2025130    131400  -10.4400 -136.4100      41.6        40       138        60
OIR    2025130    131400  -10.4400 -136.4200      41.6        40       139        60
OIR    2025130    131400  -10.4400 -136.4300      41.7        39       140        60
OIR    2025130    131400  -10.4400 -136.4400      41.7        39       140        60
OIR    2025130    131400  -10.4400 -136.4500      41.8        39       140        60
OIR    2025130    131400  -10.4400 -136.4600      41.8        39       141        60
OIR    2025130    131400  -10.4400 -136.4700      41.9        39       142        60
OIR    2025130    131400  -10.4400 -136.4800      41.9        39       141        60
OIR    2025130    131400  -10.4400 -136.4900      41.9        39       141        60
OIR    2025130    131400  -10.4400 -136.5000      42.0        39       144        60
OIR    2025130    131400  -10.4400 -136.5100      42.1        39       146        60
OIR    2025130    131400  -10.4400 -136.5200      42.1        39       149        60
OIR    2025130    131400  -10.4400 -136.5600      42.1        39       147        60
OIR    2025130    131400  -10.4400 -136.5700      42.0        39       145        60
OIR    2025130    131400  -10.4400 -136.5800      42.0        39       142        60
OIR    2025130    131400  -10.4400 -136.5900      42.0        39       143        60
OIR    2025130    131400  -10.4400 -136.6000      42.0        39       145        60
OIR    2025130    131400  -10.4400 -136.6100      42.0        39       145        60
OIR    2025130    131400  -10.4400 -136.6200      41.9        39       145        60
OIR    2025130    131400  -10.4400 -136.6300      41.9        39       143        60
OIR    2025130    131400  -10.4400 -136.6400      41.9        39       142        60
OIR    2025130    131400  -10.4400 -136.6500      41.9        38       142        60
OIR    2025130    131400  -10.4400 -136.6600      41.9        38       142        60
OIR    2025130    131400  -10.4400 -136.6700      41.9        38       141        60
OIR    2025130    131400  -10.4400 -136.6800      42.0        38       140        60
OIR    2025130    131400  -10.4400 -136.6900      42.0        38       139        60
OIR    2025130    131400  -10.4400 -136.7000      42.0        38       137        60
OIR    2025130    131400  -10.4400 -136.7100      42.0        37       135        60
OIR    2025130    131400  -10.4400 -136.7200      42.0        37       139        60
OIR    2025130    131400  -10.4400 -136.7300      41.9        37       145        60
OIR    2025130    131400  -10.4400 -136.7400      41.7        37       143        60
OIR    2025130    131400  -10.4400 -136.7500      41.3        35       141        60
OIR    2025130    131400  -10.4400 -136.7600      41.3        34       139        60
OIR    2025130    131400  -10.4400 -136.7700      41.2        33       137        60
OIR    2025130    131400  -10.4400 -136.7800      41.2        33       136        60
OIR    2025130    131400  -10.4400 -136.7900      41.3        32       136        60
OIR    2025130    131400  -10.4400 -136.8000      41.3        32       137        60
OIR    2025130    131400  -10.4400 -136.8100      41.4        32       137        60
OIR    2025130    131400  -10.4400 -136.8200      41.3        32       137        60
OIR    2025130    131400  -10.4400 -136.8300      41.2        31       136        60
OIR    2025130    131400  -10.4400 -136.8400      41.2        31       134        60
OIR    2025130    131400  -10.4400 -136.8500      41.2        31       128        60
OIR    2025130    131400  -10.4400 -136.8600      41.1        31       125        60
OIR    2025130    131400  -10.4400 -136.8700      40.9        30       127        60
OIR    2025130    131400  -10.4400 -136.8800      40.8        30       128        60
OIR    2025130    131400  -10.4400 -136.8900      40.7        30       130        60
OIR    2025130    131400  -10.4400 -136.9000      40.7        29       127        60
OIR    2025130    131400  -10.4400 -136.9100      40.9        29       121        60
OIR    2025130    131400  -10.4400 -136.9200      41.0        29       122        60
OIR    2025130    131400  -10.4400 -136.9300      41.2        29       124        60
OIR    2025130    131400  -10.4400 -136.9400      41.3        29       128        60
OIR    2025130    131400  -10.4400 -136.9500      41.4        28       133        60
OIR    2025130    131400  -10.4400 -136.9600      41.6        27       133        60
OIR    2025130    131400  -10.4400 -136.9700      41.6        27       135        60
OIR    2025130    131400  -10.4400 -136.9800      41.7        27       140        60
OIR    2025130    131400  -10.4400 -136.9900      41.8        26       144        60
OIR    2025130    131400  -10.4400 -137.0000      40.9        25       147        60
OIR    2025130    131400  -10.4400 -137.0100      38.7        21       144        60
OIR    2025130    131400  -10.4400 -137.0200      39.0        20       137        60
OIR    2025130    131400  -10.4400 -137.0300      39.1        19       130        60
OIR    2025130    131400  -10.4400 -137.0400      39.2        19       122        60
OIR    2025130    131400  -10.4400 -137.0500      39.2        19       116        60
OIR    2025130    131400  -10.4400 -137.0600      39.2        19       111        60
OIR    2025130    131400  -10.4400 -137.0700      39.2        19       114        60
OIR    2025130    131400  -10.4400 -137.0800      39.0        19       116        60
OIR    2025130    131400  -10.4400 -137.0900      38.9        19       120        60
OIR    2025130    131400  -10.4400 -137.1000      38.9        19       121        60
OIR    2025130    131400  -10.4400 -137.1100      38.8        19       116        60
OIR    2025130    131400  -10.4400 -137.1200      38.8        19       114        60
OIR    2025130    131400  -10.4400 -137.1300      38.8        19       111        60
OIR    2025130    131400  -10.4400 -137.1400      38.8        19       108        60
OIR    2025130    131400  -10.4400 -137.1500      38.7        19       104        60
OIR    2025130    131400  -10.4400 -137.1600      38.7        18       104        60
OIR    2025130    131400  -10.4400 -137.1700      38.6        18       104        60
OIR    2025130    131400  -10.4400 -137.1800      38.6        18       105        60
OIR    2025130    131400  -10.4400 -137.1900      38.4        18       105        60
OIR    2025130    131400  -10.4400 -137.2000      38.2        18       110        60
OIR    2025130    131400  -10.4400 -137.2100      38.0        17       114        60
OIR    2025130    131400  -10.4400 -137.2200      37.9        17       116        60
OIR    2025130    131400  -10.4400 -137.2300      37.5        16       120        60
OIR    2025130    131400  -10.4400 -137.2400      36.6        16       123        60
OIR    2025130    131400  -10.4400 -137.2500      36.0        15       125        60
OIR    2025130    131400  -10.4400 -137.2600      35.3        14       127        60
OIR    2025130    131400  -10.4400 -137.2700      34.2        12       123        60
OIR    2025130    131400  -10.4400 -137.2800      33.4        11       119        60
OIR    2025130    131400  -10.4400 -137.2900      33.0        11       117        60
OIR    2025130    131400  -10.4400 -137.3000      32.8        10       116        60
OIR    2025130    131400  -10.4400 -137.3100      32.6        10       115        60
OIR    2025130    131400  -10.4400 -137.3200      32.5         9       114        60
OIR    2025130    131400  -10.4400 -137.3300      32.3         9       114        60
OIR    2025130    131400  -10.4400 -137.3400      32.0         8       114        60
OIR    2025130    131400  -10.4400 -137.3500      31.8         7       114        60
OIR    2025130    131400  -10.4400 -137.3600      31.7         5       114        60
OIR    2025130    131400  -10.4400 -137.3700      31.7         5       113        60
OIR    2025130    131400  -10.4400 -137.3800      31.8         4       111        60
OIR    2025130    131400  -10.4400 -137.3900      31.8         4       109        60
OIR    2025130    131400  -10.4400 -137.4000      31.8         4       108        60
OIR    2025130    131400  -10.4400 -137.4100      31.8         4       107        60
OIR    2025130    131400  -10.4400 -137.4200      31.8         4       105        60
OIR    2025130    131400  -10.4400 -137.4300      31.8         4       107        60
OIR    2025130    131400  -10.4400 -137.4400      31.8         4       109        60
OIR    2025130    131400  -10.4400 -137.4500      31.8         4       110        60
OIR    2025130    131400  -10.4400 -137.4600      31.8         4       110        60
OIR    2025130    131400  -10.4400 -137.4700      31.8         4       110        60
OIR    2025130    131400  -10.4400 -137.4800      31.8         4       109        60
OIR    2025130    131400  -10.4400 -137.4900      31.8         4       107        60
OIR    2025130    131400  -10.4400 -137.5000      31.8         4       104        60
OIR    2025130    131400  -10.4400 -137.5100      31.8         4       105        60
OIR    2025130    131400  -10.4400 -137.5200      31.8         4       105        60
OIR    2025130    131400  -10.4400 -137.5300      31.8         4       109        60
OIR    2025130    131400  -10.4400 -137.5400      31.8         4       111        60
OIR    2025130    131400  -10.4400 -137.5500      31.8         4       111        60
OIR    2025130    131400  -10.4400 -137.5600      32.0         4       112        60
OIR    2025130    131400  -10.4400 -137.5700      32.2         3       115        60
OIR    2025130    131400  -10.4400 -137.5800      32.4         2       116        60
OIR    2025130    131400  -10.4400 -137.5900      32.5         2       117        60
OIR    2025130    131400  -10.4400 -137.6000      32.5         2       117        60
OIR    2025130    131400  -10.4400 -137.6100      32.5         2       117        60
OIR    2025130    131400  -10.4400 -137.6200      32.3         3       117        60
OIR    2025130    131400  -10.4400 -137.6300      32.0         3       116        60
OIR    2025130    131400  -10.4400 -137.6400      31.8         4       119        60
OIR    2025130    131400  -10.4400 -137.6500      31.7         4       120        60
OIR    2025130    131400  -10.4400 -137.6600      31.6         4       121        60
OIR    2025130    131400  -10.4400 -137.6700      31.6         4       123        60
OIR    2025130    131400  -10.4400 -137.6800      31.6         4       127        60
OIR    2025130    131400  -10.4400 -137.6900      31.5         4       130        60
OIR    2025130    131400  -10.4400 -137.7000      31.4         4       133        60
OIR    2025130    131400  -10.4400 -137.7100      31.2         4       135        60
OIR    2025130    131400  -10.4400 -137.7200      30.4         4       138        60
OIR    2025130    131400  -10.4400 -137.7300      27.5         2       139        60
OIR    2025130    131400  -10.4400 -137.7400      24.7         1       137        60
OIR    2025130    131400  -10.4400 -137.7500      23.1         0       135        60
OIR    2025130    131400  -10.4400 -137.7600      21.7       359       134        60
OIR    2025130    131400  -10.4400 -137.7700      20.8       358       135        60
OIR    2025130    131400  -10.4400 -137.7800      20.4       358       135        60
OIR    2025130    131400  -10.4400 -137.7900      20.1       357       137        60
OIR    2025130    131400  -10.4400 -137.8000      19.9       357       138        60
OIR    2025130    131400  -10.4400 -137.8100      19.7       357       138        60
OIR    2025130    131400  -10.4400 -137.8200      19.5       357       138        60
OIR    2025130    131400  -10.4400 -137.8300      19.3       357       139        60
OIR    2025130    131400  -10.4400 -137.8400      18.9       357       141        60
OIR    2025130    131400  -10.4400 -137.8500      18.7       357       145        60
OIR    2025130    131400  -10.4400 -137.8600      18.6       357       144        60
OIR    2025130    131400  -10.4400 -137.8700      18.5       357       142        60
OIR    2025130    131400  -10.4400 -137.8800      18.4       357       138        60
OIR    2025130    131400  -10.4400 -137.8900      18.3       356       135        60
OIR    2025130    131400  -10.4400 -137.9000      18.2       356       135        60
OIR    2025130    131400  -10.4400 -137.9100      18.2       356       134        60
OIR    2025130    131400  -10.4400 -137.9200      18.2       356       134        60
OIR    2025130    131400  -10.4400 -137.9300      18.2       356       135        60
OIR    2025130    131400  -10.4400 -137.9400      18.2       356       137        60
OIR    2025130    131400  -10.4400 -137.9500      18.2       356       139        60
OIR    2025130    131400  -10.4400 -137.9600      18.2       356       141        60
OIR    2025130    131400  -10.4400 -137.9700      18.2       356       139        60
OIR    2025130    131400  -10.4400 -137.9800      18.2       356       138        60
OIR    2025130    131400  -10.4400 -137.9900      18.2       356       141        60
OIR    2025130    131400  -10.4400 -138.0000      18.3       356       144        60
OIR    2025130    131400  -10.4400 -138.0700      23.2       350       148        60
OIR    2025130    131400  -10.4400 -138.0800      23.0       349       142        60
OIR    2025130    131400  -10.4400 -138.0900      22.9       348       138        60
OIR    2025130    131400  -10.4400 -138.1000      22.9       348       137        60
OIR    2025130    131400  -10.4400 -138.1100      23.0       348       136        60
OIR    2025130    131400  -10.4400 -138.1200      23.1       348       133        60
OIR    2025130    131400  -10.4400 -138.1300      23.4       348       132        60
OIR    2025130    131400  -10.4400 -138.1400      23.9       348       131        60
OIR    2025130    131400  -10.4400 -138.1500      24.6       349       130        60
OIR    2025130    131400  -10.4400 -138.1600      25.4       349       130        60
OIR    2025130    131400  -10.4400 -138.1700      26.2       350       131        60
OIR    2025130    131400  -10.4400 -138.1800      27.5       351       132        60
OIR    2025130    131400  -10.4400 -138.1900      28.1       351       132        60
OIR    2025130    131400  -10.4400 -138.2000      28.5       351       132        60
OIR    2025130    131400  -10.4400 -138.2100      28.7       352       131        60
OIR    2025130    131400  -10.4400 -138.2200      28.7       352       131        60
OIR    2025130    131400  -10.4400 -138.2300      28.7       352       130        60
OIR    2025130    131400  -10.4400 -138.2400      28.7       352       130        60
OIR    2025130    131400  -10.4400 -138.2500      28.7       352       131        60
OIR    2025130    131400  -10.4400 -138.2600      28.7       352       131        60
OIR    2025130    131400  -10.4400 -138.2700      28.7       352       131        60
OIR    2025130    131400  -10.4400 -138.2800      28.6       352       131        60
OIR    2025130    131400  -10.4400 -138.2900      28.5       352       130        60
OIR    2025130    131400  -10.4400 -138.3000      28.5       352       131        60
OIR    2025130    131400  -10.4400 -138.3100      28.4       353       133        60
OIR    2025130    131400  -10.4400 -138.3200      28.4       353       134        60
OIR    2025130    131400  -10.4400 -138.3300      28.4       353       136        60
OIR    2025130    131400  -10.4400 -138.3400      28.4       353       139        60
OIR    2025130    131400  -10.4400 -138.3500      28.4       353       143        60
OIR    2025130    131400  -10.4400 -138.3600      28.4       353       146        60
OIR    2025130    131400  -10.4400 -138.3700      28.3       353       149        60
OIR    2025130    131400  -10.4500 -136.3300      41.2        40       149        60
OIR    2025130    131400  -10.4500 -136.3400      41.2        40       149        60
OIR    2025130    131400  -10.4500 -136.3500      41.2        40       148        60
OIR    2025130    131400  -10.4500 -136.3600      41.3        40       146        60
OIR    2025130    131400  -10.4500 -136.3700      41.3        40       143        60
OIR    2025130    131400  -10.4500 -136.3800      41.3        40       141        60
OIR    2025130    131400  -10.4500 -136.3900      41.4        39       140        60
OIR    2025130    131400  -10.4500 -136.4000      41.4        39       140        60
OIR    2025130    131400  -10.4500 -136.4100      41.5        39       139        60
OIR    2025130    131400  -10.4500 -136.4200      41.6        39       139        60
OIR    2025130    131400  -10.4500 -136.4300      41.6        39       143        60
OIR    2025130    131400  -10.4500 -136.4400      41.7        39       144        60
OIR    2025130    131400  -10.4500 -136.4500      41.7        39       145        60
OIR    2025130    131400  -10.4500 -136.4600      41.8        39       147        60
OIR    2025130    131400  -10.4500 -136.4700      41.8        39       149        60
OIR    2025130    131400  -10.4500 -136.4800      41.8        39       147        60
OIR    2025130    131400  -10.4500 -136.4900      41.8        39       145        60
OIR    2025130    131400  -10.4500 -136.5000      41.9        39       145        60
OIR    2025130    131400  -10.4500 -136.5100      42.0        39       145        60
OIR    2025130    131400  -10.4500 -136.5200      42.1        39       148        60
OIR    2025130    131400  -10.4500 -136.5700      42.0        39       148        60
OIR    2025130    131400  -10.4500 -136.5800      42.0        39       146        60
OIR    2025130    131400  -10.4500 -136.5900      42.0        39       146        60
OIR    2025130    131400  -10.4500 -136.6000      42.0        39       146        60
OIR    2025130    131400  -10.4500 -136.6100      42.0        39       146        60
OIR    2025130    131400  -10.4500 -136.6200      41.9        39       146        60
OIR    2025130    131400  -10.4500 -136.6300      41.9        39       146        60
OIR    2025130    131400  -10.4500 -136.6400      41.9        39       146        60
OIR    2025130    131400  -10.4500 -136.6500      41.9        38       144        60
OIR    2025130    131400  -10.4500 -136.6600      41.9        38       143        60
OIR    2025130    131400  -10.4500 -136.6700      41.9        38       142        60
OIR    2025130    131400  -10.4500 -136.6800      42.0        38       141        60
OIR    2025130    131400  -10.4500 -136.6900      42.0        38       141        60
OIR    2025130    131400  -10.4500 -136.7000      42.0        38       138        60
OIR    2025130    131400  -10.4500 -136.7100      42.0        37       135        60
OIR    2025130    131400  -10.4500 -136.7200      42.0        37       139        60
OIR    2025130    131400  -10.4500 -136.7300      41.9        37       144        60
OIR    2025130    131400  -10.4500 -136.7400      41.8        36       144        60
OIR    2025130    131400  -10.4500 -136.7500      41.3        34       143        60
OIR    2025130    131400  -10.4500 -136.7600      41.3        33       141        60
OIR    2025130    131400  -10.4500 -136.7700      41.3        33       138        60
OIR    2025130    131400  -10.4500 -136.7800      41.3        33       137        60
OIR    2025130    131400  -10.4500 -136.7900      41.4        32       136        60
OIR    2025130    131400  -10.4500 -136.8000      41.5        32       136        60
OIR    2025130    131400  -10.4500 -136.8100      41.5        32       140        60
OIR    2025130    131400  -10.4500 -136.8200      41.4        32       144        60
OIR    2025130    131400  -10.4500 -136.8300      41.3        31       141        60
OIR    2025130    131400  -10.4500 -136.8400      41.2        31       136        60
OIR    2025130    131400  -10.4500 -136.8500      41.2        31       129        60
OIR    2025130    131400  -10.4500 -136.8600      41.1        30       126        60
OIR    2025130    131400  -10.4500 -136.8700      40.9        30       128        60
OIR    2025130    131400  -10.4500 -136.8800      40.7        30       130        60
OIR    2025130    131400  -10.4500 -136.8900      40.4        29       131        60
OIR    2025130    131400  -10.4500 -136.9000      40.3        29       126        60
OIR    2025130    131400  -10.4500 -136.9100      40.5        28       116        60
OIR    2025130    131400  -10.4500 -136.9200      40.9        28       119        60
OIR    2025130    131400  -10.4500 -136.9300      41.0        28       121        60
OIR    2025130    131400  -10.4500 -136.9400      41.1        28       126        60
OIR    2025130    131400  -10.4500 -136.9500      41.4        27       130        60
OIR    2025130    131400  -10.4500 -136.9600      41.5        27       126        60
OIR    2025130    131400  -10.4500 -136.9700      41.5        26       126        60
OIR    2025130    131400  -10.4500 -136.9800      41.7        26       131        60
OIR    2025130    131400  -10.4500 -136.9900      41.8        26       137        60
OIR    2025130    131400  -10.4500 -137.0000      41.8        26       147        60
OIR    2025130    131400  -10.4500 -137.0100      39.1        19       145        60
OIR    2025130    131400  -10.4500 -137.0200      39.2        19       136        60
OIR    2025130    131400  -10.4500 -137.0300      39.2        19       132        60
OIR    2025130    131400  -10.4500 -137.0400      39.3        19       127        60
OIR    2025130    131400  -10.4500 -137.0500      39.3        19       120        60
OIR    2025130    131400  -10.4500 -137.0600      39.3        19       113        60
OIR    2025130    131400  -10.4500 -137.0700      39.3        19       114        60
OIR    2025130    131400  -10.4500 -137.0800      39.2        19       116        60
OIR    2025130    131400  -10.4500 -137.0900      39.0        19       123        60
OIR    2025130    131400  -10.4500 -137.1000      38.9        19       127        60
OIR    2025130    131400  -10.4500 -137.1100      38.9        19       123        60
OIR    2025130    131400  -10.4500 -137.1200      38.8        19       117        60
OIR    2025130    131400  -10.4500 -137.1300      38.8        19       113        60
OIR    2025130    131400  -10.4500 -137.1400      38.7        19       109        60
OIR    2025130    131400  -10.4500 -137.1500      38.7        19       104        60
OIR    2025130    131400  -10.4500 -137.1600      38.6        18       105        60
OIR    2025130    131400  -10.4500 -137.1700      38.5        18       108        60
OIR    2025130    131400  -10.4500 -137.1800      38.5        18       108        60
OIR    2025130    131400  -10.4500 -137.1900      38.3        17       108        60
OIR    2025130    131400  -10.4500 -137.2000      38.0        17       109        60
OIR    2025130    131400  -10.4500 -137.2100      37.8        17       110        60
OIR    2025130    131400  -10.4500 -137.2200      37.5        16       111        60
OIR    2025130    131400  -10.4500 -137.2300      37.2        16       115        60
OIR    2025130    131400  -10.4500 -137.2400      35.9        15       121        60
OIR    2025130    131400  -10.4500 -137.2500      34.4        13       125        60
OIR    2025130    131400  -10.4500 -137.2600      33.4        12       127        60
OIR    2025130    131400  -10.4500 -137.2700      33.0        11       124        60
OIR    2025130    131400  -10.4500 -137.2800      32.8        11       120        60
OIR    2025130    131400  -10.4500 -137.2900      32.7        10       117        60
OIR    2025130    131400  -10.4500 -137.3000      32.6        10       116        60
OIR    2025130    131400  -10.4500 -137.3100      32.4        10       115        60
OIR    2025130    131400  -10.4500 -137.3200      32.3         9       115        60
OIR    2025130    131400  -10.4500 -137.3300      32.1         9       116        60
OIR    2025130    131400  -10.4500 -137.3400      31.8         7       116        60
OIR    2025130    131400  -10.4500 -137.3500      31.6         6       116        60
OIR    2025130    131400  -10.4500 -137.3600      31.6         5       116        60
OIR    2025130    131400  -10.4500 -137.3700      31.7         5       115        60
OIR    2025130    131400  -10.4500 -137.3800      31.7         4       113        60
OIR    2025130    131400  -10.4500 -137.3900      31.7         4       112        60
OIR    2025130    131400  -10.4500 -137.4000      31.8         4       110        60
OIR    2025130    131400  -10.4500 -137.4100      31.8         4       108        60
OIR    2025130    131400  -10.4500 -137.4200      31.8         4       107        60
OIR    2025130    131400  -10.4500 -137.4300      31.8         4       107        60
OIR    2025130    131400  -10.4500 -137.4400      31.8         4       109        60
OIR    2025130    131400  -10.4500 -137.4500      31.8         4       110        60
OIR    2025130    131400  -10.4500 -137.4600      31.8         4       110        60
OIR    2025130    131400  -10.4500 -137.4700      31.7         4       110        60
OIR    2025130    131400  -10.4500 -137.4800      31.7         4       109        60
OIR    2025130    131400  -10.4500 -137.4900      31.7         4       105        60
OIR    2025130    131400  -10.4500 -137.5000      31.7         4       104        60
OIR    2025130    131400  -10.4500 -137.5100      31.7         4       104        60
OIR    2025130    131400  -10.4500 -137.5200      31.7         4       105        60
OIR    2025130    131400  -10.4500 -137.5300      31.8         4       109        60
OIR    2025130    131400  -10.4500 -137.5400      31.8         4       111        60
OIR    2025130    131400  -10.4500 -137.5500      31.8         4       111        60
OIR    2025130    131400  -10.4500 -137.5600      32.0         4       114        60
OIR    2025130    131400  -10.4500 -137.5700      32.5         2       117        60
OIR    2025130    131400  -10.4500 -137.5800      32.6         2       119        60
OIR    2025130    131400  -10.4500 -137.5900      32.7         1       116        60
OIR    2025130    131400  -10.4500 -137.6000      32.7         1       116        60
OIR    2025130    131400  -10.4500 -137.6100      32.6         1       115        60
OIR    2025130    131400  -10.4500 -137.6200      32.5         2       115        60
OIR    2025130    131400  -10.4500 -137.6300      32.4         2       115        60
OIR    2025130    131400  -10.4500 -137.6400      32.0         3       116        60
OIR    2025130    131400  -10.4500 -137.6500      31.8         3       119        60
OIR    2025130    131400  -10.4500 -137.6600      31.7         4       120        60
OIR    2025130    131400  -10.4500 -137.6700      31.6         4       122        60
OIR    2025130    131400  -10.4500 -137.6800      31.6         4       127        60
OIR    2025130    131400  -10.4500 -137.6900      31.5         4       130        60
OIR    2025130    131400  -10.4500 -137.7000      31.4         4       132        60
OIR    2025130    131400  -10.4500 -137.7100      31.2         4       134        60
OIR    2025130    131400  -10.4500 -137.7200      30.5         4       137        60
OIR    2025130    131400  -10.4500 -137.7300      27.6         2       138        60
OIR    2025130    131400  -10.4500 -137.7400      25.2         1       137        60
OIR    2025130    131400  -10.4500 -137.7500      23.9         1       135        60
OIR    2025130    131400  -10.4500 -137.7600      22.5       359       133        60
OIR    2025130    131400  -10.4500 -137.7700      21.5       358       133        60
OIR    2025130    131400  -10.4500 -137.7800      20.9       358       134        60
OIR    2025130    131400  -10.4500 -137.7900      20.4       357       136        60
OIR    2025130    131400  -10.4500 -137.8000      20.1       357       137        60
OIR    2025130    131400  -10.4500 -137.8100      19.8       357       137        60
OIR    2025130    131400  -10.4500 -137.8200      19.5       357       137        60
OIR    2025130    131400  -10.4500 -137.8300      19.2       357       138        60
OIR    2025130    131400  -10.4500 -137.8400      18.9       357       140        60
OIR    2025130    131400  -10.4500 -137.8500      18.7       357       143        60
OIR    2025130    131400  -10.4500 -137.8600      18.5       357       142        60
OIR    2025130    131400  -10.4500 -137.8700      18.5       357       140        60
OIR    2025130    131400  -10.4500 -137.8800      18.4       357       136        60
OIR    2025130    131400  -10.4500 -137.8900      18.3       357       132        60
OIR    2025130    131400  -10.4500 -137.9000      18.2       356       132        60
OIR    2025130    131400  -10.4500 -137.9100      18.2       356       132        60
OIR    2025130    131400  -10.4500 -137.9200      18.2       356       132        60
OIR    2025130    131400  -10.4500 -137.9300      18.2       356       133        60
OIR    2025130    131400  -10.4500 -137.9400      18.2       356       133        60
OIR    2025130    131400  -10.4500 -137.9500      18.2       356       136        60
OIR    2025130    131400  -10.4500 -137.9600      18.2       356       141        60
OIR    2025130    131400  -10.4500 -137.9700      18.2       356       137        60
OIR    2025130    131400  -10.4500 -137.9800      18.2       356       134        60
OIR    2025130    131400  -10.4500 -137.9900      18.2       356       134        60
OIR    2025130    131400  -10.4500 -138.0000      18.3       356       136        60
OIR    2025130    131400  -10.4500 -138.0100      19.1       356       148        60
OIR    2025130    131400  -10.4500 -138.0800      22.8       349       145        60
OIR    2025130    131400  -10.4500 -138.0900      22.8       348       141        60
OIR    2025130    131400  -10.4500 -138.1000      22.8       348       140        60
OIR    2025130    131400  -10.4500 -138.1100      22.9       348       139        60
OIR    2025130    131400  -10.4500 -138.1200      23.0       348       136        60
OIR    2025130    131400  -10.4500 -138.1300      23.2       348       134        60
OIR    2025130    131400  -10.4500 -138.1400      23.6       348       132        60
OIR    2025130    131400  -10.4500 -138.1500      24.4       349       132        60
OIR    2025130    131400  -10.4500 -138.1600      25.3       350       132        60
OIR    2025130    131400  -10.4500 -138.1700      26.3       350       134        60
OIR    2025130    131400  -10.4500 -138.1800      27.4       351       136        60
OIR    2025130    131400  -10.4500 -138.1900      28.0       351       135        60
OIR    2025130    131400  -10.4500 -138.2000      28.4       352       135        60
OIR    2025130    131400  -10.4500 -138.2100      28.5       352       134        60
OIR    2025130    131400  -10.4500 -138.2200      28.6       352       133        60
OIR    2025130    131400  -10.4500 -138.2300      28.6       352       132        60
OIR    2025130    131400  -10.4500 -138.2400      28.6       352       131        60
OIR    2025130    131400  -10.4500 -138.2500      28.7       352       130        60
OIR    2025130    131400  -10.4500 -138.2600      28.7       352       130        60
OIR    2025130    131400  -10.4500 -138.2700      28.6       352       130        60
OIR    2025130    131400  -10.4500 -138.2800      28.5       352       130        60
OIR    2025130    131400  -10.4500 -138.2900      28.5       353       129        60
OIR    2025130    131400  -10.4500 -138.3000      28.5       353       132        60
OIR    2025130    131400  -10.4500 -138.3100      28.4       353       134        60
OIR    2025130    131400  -10.4500 -138.3200      28.4       353       136        60
OIR    2025130    131400  -10.4500 -138.3300      28.4       353       138        60
OIR    2025130    131400  -10.4500 -138.3400      28.4       353       142        60
OIR    2025130    131400  -10.4500 -138.3500      28.4       353       144        60
OIR    2025130    131400  -10.4500 -138.3600      28.4       353       146        60
OIR    2025130    131400  -10.4600 -136.3600      41.2        40       146        60
OIR    2025130    131400  -10.4600 -136.3700      41.2        40       143        60
OIR    2025130    131400  -10.4600 -136.3800      41.2        39       141        60
OIR    2025130    131400  -10.4600 -136.3900      41.3        39       142        60
OIR    2025130    131400  -10.4600 -136.4000      41.3        39       142        60
OIR    2025130    131400  -10.4600 -136.4100      41.4        39       143        60
OIR    2025130    131400  -10.4600 -136.4200      41.5        39       143        60
OIR    2025130    131400  -10.4600 -136.4300      41.6        39       145        60
OIR    2025130    131400  -10.4600 -136.4400      41.7        39       145        60
OIR    2025130    131400  -10.4600 -136.4500      41.7        39       145        60
OIR    2025130    131400  -10.4600 -136.4600      41.8        39       146        60
OIR    2025130    131400  -10.4600 -136.4700      41.8        39       148        60
OIR    2025130    131400  -10.4600 -136.4800      41.8        39       147        60
OIR    2025130    131400  -10.4600 -136.4900      41.8        39       145        60
OIR    2025130    131400  -10.4600 -136.5000      41.8        39       144        60
OIR    2025130    131400  -10.4600 -136.5100      42.0        39       142        60
OIR    2025130    131400  -10.4600 -136.5200      42.0        39       144        60
OIR    2025130    131400  -10.4600 -136.5300      42.1        39       145        60
OIR    2025130    131400  -10.4600 -136.5400      42.1        39       148        60
OIR    2025130    131400  -10.4600 -136.5500      42.1        39       148        60
OIR    2025130    131400  -10.4600 -136.5600      42.1        39       148        60
OIR    2025130    131400  -10.4600 -136.5700      42.1        39       147        60
OIR    2025130    131400  -10.4600 -136.5800      42.0        39       146        60
OIR    2025130    131400  -10.4600 -136.5900      42.0        39       147        60
OIR    2025130    131400  -10.4600 -136.6000      42.0        39       148        60
OIR    2025130    131400  -10.4600 -136.6100      41.9        39       147        60
OIR    2025130    131400  -10.4600 -136.6200      41.9        39       146        60
OIR    2025130    131400  -10.4600 -136.6300      41.9        39       146        60
OIR    2025130    131400  -10.4600 -136.6400      41.9        38       146        60
OIR    2025130    131400  -10.4600 -136.6500      41.9        38       144        60
OIR    2025130    131400  -10.4600 -136.6600      42.0        38       143        60
OIR    2025130    131400  -10.4600 -136.6700      42.0        38       142        60
OIR    2025130    131400  -10.4600 -136.6800      42.0        38       142        60
OIR    2025130    131400  -10.4600 -136.6900      42.0        38       142        60
OIR    2025130    131400  -10.4600 -136.7000      42.0        37       139        60
OIR    2025130    131400  -10.4600 -136.7100      42.0        37       136        60
OIR    2025130    131400  -10.4600 -136.7200      42.1        37       141        60
OIR    2025130    131400  -10.4600 -136.7300      42.1        36       144        60
OIR    2025130    131400  -10.4600 -136.7400      42.1        36       144        60
OIR    2025130    131400  -10.4600 -136.7500      41.5        33       142        60
OIR    2025130    131400  -10.4600 -136.7600      41.5        32       138        60
OIR    2025130    131400  -10.4600 -136.7700      41.5        32       134        60
OIR    2025130    131400  -10.4600 -136.7800      41.6        32       130        60
OIR    2025130    131400  -10.4600 -136.7900      41.6        32       131        60
OIR    2025130    131400  -10.4600 -136.8000      41.6        32       136        60
OIR    2025130    131400  -10.4600 -136.8100      41.6        32       140        60
OIR    2025130    131400  -10.4600 -136.8200      41.6        32       144        60
OIR    2025130    131400  -10.4600 -136.8300      41.4        31       141        60
OIR    2025130    131400  -10.4600 -136.8400      41.3        30       136        60
OIR    2025130    131400  -10.4600 -136.8500      41.1        30       129        60
OIR    2025130    131400  -10.4600 -136.8600      40.9        30       127        60
OIR    2025130    131400  -10.4600 -136.8700      40.7        29       130        60
OIR    2025130    131400  -10.4600 -136.8800      40.3        29       131        60
OIR    2025130    131400  -10.4600 -136.8900      40.1        28       132        60
OIR    2025130    131400  -10.4600 -136.9000      40.1        28       128        60
OIR    2025130    131400  -10.4600 -136.9100      40.2        28       121        60
OIR    2025130    131400  -10.4600 -136.9200      40.6        28       123        60
OIR    2025130    131400  -10.4600 -136.9300      40.8        27       124        60
OIR    2025130    131400  -10.4600 -136.9400      40.9        27       127        60
OIR    2025130    131400  -10.4600 -136.9500      41.0        26       129        60
OIR    2025130    131400  -10.4600 -136.9600      41.2        26       123        60
OIR    2025130    131400  -10.4600 -136.9700      41.2        26       122        60
OIR    2025130    131400  -10.4600 -136.9800      41.5        26       124        60
OIR    2025130    131400  -10.4600 -136.9900      41.7        26       129        60
OIR    2025130    131400  -10.4600 -137.0000      42.0        26       141        60
OIR    2025130    131400  -10.4600 -137.0100      39.4        20       143        60
OIR    2025130    131400  -10.4600 -137.0200      39.2        19       140        60
OIR    2025130    131400  -10.4600 -137.0300      39.3        19       137        60
OIR    2025130    131400  -10.4600 -137.0400      39.3        19       135        60
OIR    2025130    131400  -10.4600 -137.0500      39.3        19       129        60
OIR    2025130    131400  -10.4600 -137.0600      39.3        19       124        60
OIR    2025130    131400  -10.4600 -137.0700      39.3        19       122        60
OIR    2025130    131400  -10.4600 -137.0800      39.2        19       123        60
OIR    2025130    131400  -10.4600 -137.0900      39.1        19       129        60
OIR    2025130    131400  -10.4600 -137.1000      39.0        19       132        60
OIR    2025130    131400  -10.4600 -137.1100      39.0        19       130        60
OIR    2025130    131400  -10.4600 -137.1200      38.9        19       124        60
OIR    2025130    131400  -10.4600 -137.1300      38.8        19       115        60
OIR    2025130    131400  -10.4600 -137.1400      38.7        19       111        60
OIR    2025130    131400  -10.4600 -137.1500      38.6        19       108        60
OIR    2025130    131400  -10.4600 -137.1600      38.5        18       108        60
OIR    2025130    131400  -10.4600 -137.1700      38.4        18       109        60
OIR    2025130    131400  -10.4600 -137.1800      38.3        17       109        60
OIR    2025130    131400  -10.4600 -137.1900      38.1        17       109        60
OIR    2025130    131400  -10.4600 -137.2000      37.8        16       108        60
OIR    2025130    131400  -10.4600 -137.2100      37.4        16       108        60
OIR    2025130    131400  -10.4600 -137.2200      37.0        16       109        60
OIR    2025130    131400  -10.4600 -137.2300      36.4        15       113        60
OIR    2025130    131400  -10.4600 -137.2400      34.8        14       116        60
OIR    2025130    131400  -10.4600 -137.2500      33.5        12       120        60
OIR    2025130    131400  -10.4600 -137.2600      32.9        11       122        60
OIR    2025130    131400  -10.4600 -137.2700      32.7        11       119        60
OIR    2025130    131400  -10.4600 -137.2800      32.7        10       116        60
OIR    2025130    131400  -10.4600 -137.2900      32.6        10       115        60
OIR    2025130    131400  -10.4600 -137.3000      32.5        10       113        60
OIR    2025130    131400  -10.4600 -137.3100      32.4         9       113        60
OIR    2025130    131400  -10.4600 -137.3200      32.2         9       113        60
OIR    2025130    131400  -10.4600 -137.3300      31.9         8       116        60
OIR    2025130    131400  -10.4600 -137.3400      31.5         6       119        60
OIR    2025130    131400  -10.4600 -137.3500      31.4         5       121        60
OIR    2025130    131400  -10.4600 -137.3600      31.5         5       120        60
OIR    2025130    131400  -10.4600 -137.3700      31.6         4       116        60
OIR    2025130    131400  -10.4600 -137.3800      31.7         4       114        60
OIR    2025130    131400  -10.4600 -137.3900      31.7         4       111        60
OIR    2025130    131400  -10.4600 -137.4000      31.7         4       110        60
OIR    2025130    131400  -10.4600 -137.4100      31.8         4       110        60
OIR    2025130    131400  -10.4600 -137.4200      31.8         4       108        60
OIR    2025130    131400  -10.4600 -137.4300      31.8         4       108        60
OIR    2025130    131400  -10.4600 -137.4400      31.8         4       108        60
OIR    2025130    131400  -10.4600 -137.4500      31.8         4       109        60
OIR    2025130    131400  -10.4600 -137.4600      31.7         4       111        60
OIR    2025130    131400  -10.4600 -137.4700      31.7         4       111        60
OIR    2025130    131400  -10.4600 -137.4800      31.7         4       111        60
OIR    2025130    131400  -10.4600 -137.4900      31.7         4       107        60
OIR    2025130    131400  -10.4600 -137.5000      31.7         4       104        60
OIR    2025130    131400  -10.4600 -137.5100      31.7         4       105        60
OIR    2025130    131400  -10.4600 -137.5200      31.7         4       107        60
OIR    2025130    131400  -10.4600 -137.5300      31.7         4       111        60
OIR    2025130    131400  -10.4600 -137.5400      31.7         4       115        60
OIR    2025130    131400  -10.4600 -137.5500      31.8         4       116        60
OIR    2025130    131400  -10.4600 -137.5600      32.0         3       119        60
OIR    2025130    131400  -10.4600 -137.5700      32.7         1       121        60
OIR    2025130    131400  -10.4600 -137.5800      32.7         1       120        60
OIR    2025130    131400  -10.4600 -137.5900      32.8         1       116        60
OIR    2025130    131400  -10.4600 -137.6000      32.7         1       114        60
OIR    2025130    131400  -10.4600 -137.6100      32.7         1       114        60
OIR    2025130    131400  -10.4600 -137.6200      32.7         1       113        60
OIR    2025130    131400  -10.4600 -137.6300      32.5         1       113        60
OIR    2025130    131400  -10.4600 -137.6400      32.3         2       114        60
OIR    2025130    131400  -10.4600 -137.6500      31.9         3       116        60
OIR    2025130    131400  -10.4600 -137.6600      31.8         4       119        60
OIR    2025130    131400  -10.4600 -137.6700      31.7         4       122        60
OIR    2025130    131400  -10.4600 -137.6800      31.6         4       125        60
OIR    2025130    131400  -10.4600 -137.6900      31.6         4       128        60
OIR    2025130    131400  -10.4600 -137.7000      31.5         4       129        60
OIR    2025130    131400  -10.4600 -137.7100      31.2         4       132        60
OIR    2025130    131400  -10.4600 -137.7200      30.4         4       135        60
OIR    2025130    131400  -10.4600 -137.7300      28.0         3       136        60
OIR    2025130    131400  -10.4600 -137.7400      25.8         1       137        60
OIR    2025130    131400  -10.4600 -137.7500      24.8         1       135        60
OIR    2025130    131400  -10.4600 -137.7600      23.8       360       134        60
OIR    2025130    131400  -10.4600 -137.7700      22.6       359       134        60
OIR    2025130    131400  -10.4600 -137.7800      21.8       358       133        60
OIR    2025130    131400  -10.4600 -137.7900      21.1       358       135        60
OIR    2025130    131400  -10.4600 -137.8000      20.6       357       135        60
OIR    2025130    131400  -10.4600 -137.8100      20.0       357       136        60
OIR    2025130    131400  -10.4600 -137.8200      19.5       357       136        60
OIR    2025130    131400  -10.4600 -137.8300      19.2       357       135        60
OIR    2025130    131400  -10.4600 -137.8400      18.9       357       137        60
OIR    2025130    131400  -10.4600 -137.8500      18.7       357       139        60
OIR    2025130    131400  -10.4600 -137.8600      18.6       357       139        60
OIR    2025130    131400  -10.4600 -137.8700      18.5       357       137        60
OIR    2025130    131400  -10.4600 -137.8800      18.4       357       134        60
OIR    2025130    131400  -10.4600 -137.8900      18.4       357       131        60
OIR    2025130    131400  -10.4600 -137.9000      18.3       356       130        60
OIR    2025130    131400  -10.4600 -137.9100      18.2       356       130        60
OIR    2025130    131400  -10.4600 -137.9200      18.2       356       131        60
OIR    2025130    131400  -10.4600 -137.9300      18.2       356       131        60
OIR    2025130    131400  -10.4600 -137.9400      18.2       356       132        60
OIR    2025130    131400  -10.4600 -137.9500      18.2       356       133        60
OIR    2025130    131400  -10.4600 -137.9600      18.2       356       134        60
OIR    2025130    131400  -10.4600 -137.9700      18.2       356       135        60
OIR    2025130    131400  -10.4600 -137.9800      18.2       356       136        60
OIR    2025130    131400  -10.4600 -137.9900      18.2       356       137        60
OIR    2025130    131400  -10.4600 -138.0000      18.7       355       138        60
OIR    2025130    131400  -10.4600 -138.0100      20.2       355       143        60
OIR    2025130    131400  -10.4600 -138.0800      22.7       349       149        60
OIR    2025130    131400  -10.4600 -138.0900      22.7       348       146        60
OIR    2025130    131400  -10.4600 -138.1000      22.8       348       144        60
OIR    2025130    131400  -10.4600 -138.1100      22.8       348       142        60
OIR    2025130    131400  -10.4600 -138.1200      22.9       348       140        60
OIR    2025130    131400  -10.4600 -138.1300      23.1       348       138        60
OIR    2025130    131400  -10.4600 -138.1400      23.6       349       136        60
OIR    2025130    131400  -10.4600 -138.1500      24.4       349       136        60
OIR    2025130    131400  -10.4600 -138.1600      25.4       350       135        60
OIR    2025130    131400  -10.4600 -138.1700      26.3       351       136        60
OIR    2025130    131400  -10.4600 -138.1800      27.3       351       137        60
OIR    2025130    131400  -10.4600 -138.1900      28.0       352       135        60
OIR    2025130    131400  -10.4600 -138.2000      28.3       352       135        60
OIR    2025130    131400  -10.4600 -138.2100      28.5       352       135        60
OIR    2025130    131400  -10.4600 -138.2200      28.6       352       134        60
OIR    2025130    131400  -10.4600 -138.2300      28.6       352       133        60
OIR    2025130    131400  -10.4600 -138.2400      28.6       352       131        60
OIR    2025130    131400  -10.4600 -138.2500      28.6       352       129        60
OIR    2025130    131400  -10.4600 -138.2600      28.6       352       128        60
OIR    2025130    131400  -10.4600 -138.2700      28.6       352       128        60
OIR    2025130    131400  -10.4600 -138.2800      28.5       353       129        60
OIR    2025130    131400  -10.4600 -138.2900      28.5       353       130        60
OIR    2025130    131400  -10.4600 -138.3000      28.5       353       134        60
OIR    2025130    131400  -10.4600 -138.3100      28.5       353       137        60
OIR    2025130    131400  -10.4600 -138.3200      28.4       353       138        60
OIR    2025130    131400  -10.4600 -138.3300      28.4       353       141        60
OIR    2025130    131400  -10.4600 -138.3400      28.4       353       144        60
OIR    2025130    131400  -10.4600 -138.3500      28.4       353       147        60
OIR    2025130    131400  -10.4700 -136.3600      41.1        40       146        60
OIR    2025130    131400  -10.4700 -136.3700      41.1        39       143        60
OIR    2025130    131400  -10.4700 -136.3800      41.1        39       142        60
OIR    2025130    131400  -10.4700 -136.3900      41.2        39       143        60
OIR    2025130    131400  -10.4700 -136.4000      41.2        39       144        60
OIR    2025130    131400  -10.4700 -136.4100      41.3        39       147        60
OIR    2025130    131400  -10.4700 -136.4200      41.4        39       148        60
OIR    2025130    131400  -10.4700 -136.4300      41.5        39       146        60
OIR    2025130    131400  -10.4700 -136.4400      41.6        39       145        60
OIR    2025130    131400  -10.4700 -136.4500      41.6        39       144        60
OIR    2025130    131400  -10.4700 -136.4600      41.7        39       145        60
OIR    2025130    131400  -10.4700 -136.4700      41.7        39       147        60
OIR    2025130    131400  -10.4700 -136.4800      41.8        39       146        60
OIR    2025130    131400  -10.4700 -136.4900      41.8        39       145        60
OIR    2025130    131400  -10.4700 -136.5000      41.8        39       143        60
OIR    2025130    131400  -10.4700 -136.5100      41.9        39       140        60
OIR    2025130    131400  -10.4700 -136.5200      42.0        39       138        60
OIR    2025130    131400  -10.4700 -136.5300      42.0        39       139        60
OIR    2025130    131400  -10.4700 -136.5400      42.1        39       143        60
OIR    2025130    131400  -10.4700 -136.5500      42.1        39       145        60
OIR    2025130    131400  -10.4700 -136.5600      42.1        39       146        60
OIR    2025130    131400  -10.4700 -136.5700      42.0        39       147        60
OIR    2025130    131400  -10.4700 -136.5800      42.0        39       146        60
OIR    2025130    131400  -10.4700 -136.5900      42.0        39       148        60
OIR    2025130    131400  -10.4700 -136.6100      41.9        39       148        60
OIR    2025130    131400  -10.4700 -136.6200      41.9        39       146        60
OIR    2025130    131400  -10.4700 -136.6300      41.9        38       146        60
OIR    2025130    131400  -10.4700 -136.6400      41.9        38       145        60
OIR    2025130    131400  -10.4700 -136.6500      41.9        38       143        60
OIR    2025130    131400  -10.4700 -136.6600      41.9        38       143        60
OIR    2025130    131400  -10.4700 -136.6700      42.0        38       143        60
OIR    2025130    131400  -10.4700 -136.6800      42.0        38       143        60
OIR    2025130    131400  -10.4700 -136.6900      42.0        37       143        60
OIR    2025130    131400  -10.4700 -136.7000      42.1        37       140        60
OIR    2025130    131400  -10.4700 -136.7100      42.1        37       139        60
OIR    2025130    131400  -10.4700 -136.7200      42.1        37       142        60
OIR    2025130    131400  -10.4700 -136.7300      42.2        36       145        60
OIR    2025130    131400  -10.4700 -136.7400      42.2        36       144        60
OIR    2025130    131400  -10.4700 -136.7500      41.5        32       141        60
OIR    2025130    131400  -10.4700 -136.7600      41.5        32       136        60
OIR    2025130    131400  -10.4700 -136.7700      41.5        32       130        60
OIR    2025130    131400  -10.4700 -136.7800      41.6        32       122        60
OIR    2025130    131400  -10.4700 -136.7900      41.6        32       126        60
OIR    2025130    131400  -10.4700 -136.8000      41.6        32       136        60
OIR    2025130    131400  -10.4700 -136.8100      41.6        32       140        60
OIR    2025130    131400  -10.4700 -136.8200      41.7        32       143        60
OIR    2025130    131400  -10.4700 -136.8300      41.6        30       140        60
OIR    2025130    131400  -10.4700 -136.8400      41.1        29       136        60
OIR    2025130    131400  -10.4700 -136.8500      40.9        29       130        60
OIR    2025130    131400  -10.4700 -136.8600      40.6        29       129        60
OIR    2025130    131400  -10.4700 -136.8700      40.3        28       132        60
OIR    2025130    131400  -10.4700 -136.8800      40.1        28       133        60
OIR    2025130    131400  -10.4700 -136.8900      40.0        28       132        60
OIR    2025130    131400  -10.4700 -136.9000      40.0        27       130        60
OIR    2025130    131400  -10.4700 -136.9100      40.1        27       126        60
OIR    2025130    131400  -10.4700 -136.9200      40.2        27       127        60
OIR    2025130    131400  -10.4700 -136.9300      40.4        27       129        60
OIR    2025130    131400  -10.4700 -136.9400      40.6        26       129        60
OIR    2025130    131400  -10.4700 -136.9500      40.7        26       128        60
OIR    2025130    131400  -10.4700 -136.9600      40.8        26       122        60
OIR    2025130    131400  -10.4700 -136.9700      40.8        26       119        60
OIR    2025130    131400  -10.4700 -136.9800      40.8        25       119        60
OIR    2025130    131400  -10.4700 -136.9900      40.9        25       123        60
OIR    2025130    131400  -10.4700 -137.0000      41.1        25       135        60
OIR    2025130    131400  -10.4700 -137.0100      39.7        21       141        60
OIR    2025130    131400  -10.4700 -137.0200      39.4        19       143        60
OIR    2025130    131400  -10.4700 -137.0300      39.4        19       142        60
OIR    2025130    131400  -10.4700 -137.0400      39.3        19       142        60
OIR    2025130    131400  -10.4700 -137.0500      39.3        19       139        60
OIR    2025130    131400  -10.4700 -137.0600      39.3        19       135        60
OIR    2025130    131400  -10.4700 -137.0700      39.3        19       130        60
OIR    2025130    131400  -10.4700 -137.0800      39.3        19       129        60
OIR    2025130    131400  -10.4700 -137.0900      39.1        19       133        60
OIR    2025130    131400  -10.4700 -137.1000      39.0        19       136        60
OIR    2025130    131400  -10.4700 -137.1100      39.0        19       136        60
OIR    2025130    131400  -10.4700 -137.1200      39.0        19       128        60
OIR    2025130    131400  -10.4700 -137.1300      38.9        19       116        60
OIR    2025130    131400  -10.4700 -137.1400      38.7        19       113        60
OIR    2025130    131400  -10.4700 -137.1500      38.6        19       110        60
OIR    2025130    131400  -10.4700 -137.1600      38.3        18       110        60
OIR    2025130    131400  -10.4700 -137.1700      38.3        17       109        60
OIR    2025130    131400  -10.4700 -137.1800      38.2        17       110        60
OIR    2025130    131400  -10.4700 -137.1900      38.0        16       110        60
OIR    2025130    131400  -10.4700 -137.2000      37.7        16       108        60
OIR    2025130    131400  -10.4700 -137.2100      37.2        15       108        60
OIR    2025130    131400  -10.4700 -137.2200      36.6        15       108        60
OIR    2025130    131400  -10.4700 -137.2300      35.7        14       110        60
OIR    2025130    131400  -10.4700 -137.2400      34.2        13       114        60
OIR    2025130    131400  -10.4700 -137.2500      33.4        12       116        60
OIR    2025130    131400  -10.4700 -137.2600      32.9        11       116        60
OIR    2025130    131400  -10.4700 -137.2700      32.7        10       115        60
OIR    2025130    131400  -10.4700 -137.2800      32.7        10       113        60
OIR    2025130    131400  -10.4700 -137.2900      32.6        10       112        60
OIR    2025130    131400  -10.4700 -137.3000      32.5        10       111        60
OIR    2025130    131400  -10.4700 -137.3100      32.4         9       111        60
OIR    2025130    131400  -10.4700 -137.3200      32.1         9       112        60
OIR    2025130    131400  -10.4700 -137.3300      31.6         8       116        60
OIR    2025130    131400  -10.4700 -137.3400      31.3         6       121        60
OIR    2025130    131400  -10.4700 -137.3500      31.4         5       124        60
OIR    2025130    131400  -10.4700 -137.3600      31.4         4       123        60
OIR    2025130    131400  -10.4700 -137.3700      31.5         4       119        60
OIR    2025130    131400  -10.4700 -137.3800      31.6         4       115        60
OIR    2025130    131400  -10.4700 -137.3900      31.7         4       111        60
OIR    2025130    131400  -10.4700 -137.4000      31.7         4       111        60
OIR    2025130    131400  -10.4700 -137.4100      31.7         4       110        60
OIR    2025130    131400  -10.4700 -137.4200      31.8         4       109        60
OIR    2025130    131400  -10.4700 -137.4300      31.8         4       109        60
OIR    2025130    131400  -10.4700 -137.4400      31.8         4       109        60
OIR    2025130    131400  -10.4700 -137.4500      31.7         4       110        60
OIR    2025130    131400  -10.4700 -137.4600      31.7         4       112        60
OIR    2025130    131400  -10.4700 -137.4700      31.7         4       113        60
OIR    2025130    131400  -10.4700 -137.4800      31.7         4       113        60
OIR    2025130    131400  -10.4700 -137.4900      31.7         4       109        60
OIR    2025130    131400  -10.4700 -137.5000      31.7         4       105        60
OIR    2025130    131400  -10.4700 -137.5100      31.7         4       107        60
OIR    2025130    131400  -10.4700 -137.5200      31.7         4       108        60
OIR    2025130    131400  -10.4700 -137.5300      31.7         4       113        60
OIR    2025130    131400  -10.4700 -137.5400      31.7         4       117        60
OIR    2025130    131400  -10.4700 -137.5500      31.8         4       121        60
OIR    2025130    131400  -10.4700 -137.5600      32.1         3       122        60
OIR    2025130    131400  -10.4700 -137.5700      32.7         1       123        60
OIR    2025130    131400  -10.4700 -137.5800      32.8         1       120        60
OIR    2025130    131400  -10.4700 -137.5900      32.8         1       114        60
OIR    2025130    131400  -10.4700 -137.6000      32.8         1       113        60
OIR    2025130    131400  -10.4700 -137.6100      32.7         1       112        60
OIR    2025130    131400  -10.4700 -137.6200      32.7         1       111        60
OIR    2025130    131400  -10.4700 -137.6300      32.6         1       111        60
OIR    2025130    131400  -10.4700 -137.6400      32.5         1       112        60
OIR    2025130    131400  -10.4700 -137.6500      32.2         2       114        60
OIR    2025130    131400  -10.4700 -137.6600      31.9         3       119        60
OIR    2025130    131400  -10.4700 -137.6700      31.8         4       122        60
OIR    2025130    131400  -10.4700 -137.6800      31.7         4       124        60
OIR    2025130    131400  -10.4700 -137.6900      31.6         4       126        60
OIR    2025130    131400  -10.4700 -137.7000      31.5         4       127        60
OIR    2025130    131400  -10.4700 -137.7100      31.2         4       130        60
OIR    2025130    131400  -10.4700 -137.7200      30.4         4       133        60
OIR    2025130    131400  -10.4700 -137.7300      28.6         3       135        60
OIR    2025130    131400  -10.4700 -137.7400      26.5         1       136        60
OIR    2025130    131400  -10.4700 -137.7500      25.6         1       136        60
OIR    2025130    131400  -10.4700 -137.7600      24.9         0       135        60
OIR    2025130    131400  -10.4700 -137.7700      24.0       359       134        60
OIR    2025130    131400  -10.4700 -137.7800      23.0       358       133        60
OIR    2025130    131400  -10.4700 -137.7900      22.3       358       134        60
OIR    2025130    131400  -10.4700 -137.8000      21.6       358       134        60
OIR    2025130    131400  -10.4700 -137.8100      20.9       357       134        60
OIR    2025130    131400  -10.4700 -137.8200      20.0       357       134        60
OIR    2025130    131400  -10.4700 -137.8300      19.3       357       134        60
OIR    2025130    131400  -10.4700 -137.8400      18.9       357       134        60
OIR    2025130    131400  -10.4700 -137.8500      18.7       357       135        60
OIR    2025130    131400  -10.4700 -137.8600      18.6       357       136        60
OIR    2025130    131400  -10.4700 -137.8700      18.5       357       134        60
OIR    2025130    131400  -10.4700 -137.8800      18.4       357       132        60
OIR    2025130    131400  -10.4700 -137.8900      18.4       357       129        60
OIR    2025130    131400  -10.4700 -137.9000      18.3       356       128        60
OIR    2025130    131400  -10.4700 -137.9100      18.3       356       128        60
OIR    2025130    131400  -10.4700 -137.9200      18.2       356       128        60
OIR    2025130    131400  -10.4700 -137.9300      18.2       356       129        60
OIR    2025130    131400  -10.4700 -137.9400      18.2       356       130        60
OIR    2025130    131400  -10.4700 -137.9500      18.2       356       130        60
OIR    2025130    131400  -10.4700 -137.9600      18.2       356       129        60
OIR    2025130    131400  -10.4700 -137.9700      18.2       356       133        60
OIR    2025130    131400  -10.4700 -137.9800      18.2       356       136        60
OIR    2025130    131400  -10.4700 -137.9900      18.4       355       138        60
OIR    2025130    131400  -10.4700 -138.0000      19.5       355       140        60
OIR    2025130    131400  -10.4700 -138.0100      21.2       355       140        60
OIR    2025130    131400  -10.4700 -138.0200      23.2       355       144        60
OIR    2025130    131400  -10.4700 -138.0900      22.7       348       150        60
OIR    2025130    131400  -10.4700 -138.1000      22.7       348       147        60
OIR    2025130    131400  -10.4700 -138.1100      22.8       348       145        60
OIR    2025130    131400  -10.4700 -138.1200      22.9       348       142        60
OIR    2025130    131400  -10.4700 -138.1300      23.1       349       141        60
OIR    2025130    131400  -10.4700 -138.1400      23.7       349       139        60
OIR    2025130    131400  -10.4700 -138.1500      24.7       350       138        60
OIR    2025130    131400  -10.4700 -138.1600      25.7       351       137        60
OIR    2025130    131400  -10.4700 -138.1700      26.5       351       137        60
OIR    2025130    131400  -10.4700 -138.1800      27.3       352       137        60
OIR    2025130    131400  -10.4700 -138.1900      28.1       352       136        60
OIR    2025130    131400  -10.4700 -138.2000      28.4       352       135        60
OIR    2025130    131400  -10.4700 -138.2100      28.5       352       136        60
OIR    2025130    131400  -10.4700 -138.2200      28.6       352       136        60
OIR    2025130    131400  -10.4700 -138.2300      28.6       352       134        60
OIR    2025130    131400  -10.4700 -138.2400      28.6       352       131        60
OIR    2025130    131400  -10.4700 -138.2500      28.6       352       128        60
OIR    2025130    131400  -10.4700 -138.2600      28.6       352       128        60
OIR    2025130    131400  -10.4700 -138.2700      28.6       352       128        60
OIR    2025130    131400  -10.4700 -138.2800      28.5       353       130        60
OIR    2025130    131400  -10.4700 -138.2900      28.5       353       132        60
OIR    2025130    131400  -10.4700 -138.3000      28.5       353       136        60
OIR    2025130    131400  -10.4700 -138.3100      28.5       353       140        60
OIR    2025130    131400  -10.4700 -138.3200      28.4       353       142        60
OIR    2025130    131400  -10.4700 -138.3300      28.4       353       144        60
OIR    2025130    131400  -10.4700 -138.3400      28.4       353       146        60
OIR    2025130    131400  -10.4800 -136.3500      40.9        40       148        60
OIR    2025130    131400  -10.4800 -136.3600      41.0        39       146        60
OIR    2025130    131400  -10.4800 -136.3700      41.0        39       144        60
OIR    2025130    131400  -10.4800 -136.3800      41.1        39       142        60
OIR    2025130    131400  -10.4800 -136.3900      41.1        39       142        60
OIR    2025130    131400  -10.4800 -136.4000      41.2        39       142        60
OIR    2025130    131400  -10.4800 -136.4100      41.2        39       145        60
OIR    2025130    131400  -10.4800 -136.4200      41.3        39       147        60
OIR    2025130    131400  -10.4800 -136.4300      41.3        39       147        60
OIR    2025130    131400  -10.4800 -136.4400      41.5        39       146        60
OIR    2025130    131400  -10.4800 -136.4500      41.6        39       144        60
OIR    2025130    131400  -10.4800 -136.4600      41.6        39       144        60
OIR    2025130    131400  -10.4800 -136.4700      41.7        39       145        60
OIR    2025130    131400  -10.4800 -136.4800      41.7        39       143        60
OIR    2025130    131400  -10.4800 -136.4900      41.7        39       142        60
OIR    2025130    131400  -10.4800 -136.5000      41.7        39       140        60
OIR    2025130    131400  -10.4800 -136.5100      41.8        39       139        60
OIR    2025130    131400  -10.4800 -136.5200      41.9        39       138        60
OIR    2025130    131400  -10.4800 -136.5300      41.9        39       138        60
OIR    2025130    131400  -10.4800 -136.5400      42.0        39       140        60
OIR    2025130    131400  -10.4800 -136.5500      42.0        39       142        60
OIR    2025130    131400  -10.4800 -136.5600      42.0        39       144        60
OIR    2025130    131400  -10.4800 -136.5700      42.0        39       147        60
OIR    2025130    131400  -10.4800 -136.5800      42.0        39       149        60
OIR    2025130    131400  -10.4800 -136.5900      42.0        39       148        60
OIR    2025130    131400  -10.4800 -136.6000      41.9        39       147        60
OIR    2025130    131400  -10.4800 -136.6100      41.9        39       146        60
OIR    2025130    131400  -10.4800 -136.6200      41.9        38       145        60
OIR    2025130    131400  -10.4800 -136.6300      41.9        38       145        60
OIR    2025130    131400  -10.4800 -136.6400      41.9        38       145        60
OIR    2025130    131400  -10.4800 -136.6500      41.9        38       145        60
OIR    2025130    131400  -10.4800 -136.6600      41.9        38       143        60
OIR    2025130    131400  -10.4800 -136.6700      41.9        38       141        60
OIR    2025130    131400  -10.4800 -136.6800      42.0        38       142        60
OIR    2025130    131400  -10.4800 -136.6900      42.0        37       144        60
OIR    2025130    131400  -10.4800 -136.7000      42.1        37       139        60
OIR    2025130    131400  -10.4800 -136.7100      42.2        37       137        60
OIR    2025130    131400  -10.4800 -136.7200      42.2        36       139        60
OIR    2025130    131400  -10.4800 -136.7300      42.1        36       141        60
OIR    2025130    131400  -10.4800 -136.7400      42.2        36       142        60
OIR    2025130    131400  -10.4800 -136.7500      41.4        32       139        60
OIR    2025130    131400  -10.4800 -136.7600      41.4        32       131        60
OIR    2025130    131400  -10.4800 -136.7700      41.5        32       125        60
OIR    2025130    131400  -10.4800 -136.7800      41.6        32       121        60
OIR    2025130    131400  -10.4800 -136.7900      41.6        32       125        60
OIR    2025130    131400  -10.4800 -136.8000      41.6        32       136        60
OIR    2025130    131400  -10.4800 -136.8100      41.6        32       136        60
OIR    2025130    131400  -10.4800 -136.8200      41.3        31       135        60
OIR    2025130    131400  -10.4800 -136.8300      41.1        29       131        60
OIR    2025130    131400  -10.4800 -136.8400      40.9        28       128        60
OIR    2025130    131400  -10.4800 -136.8500      40.8        28       127        60
OIR    2025130    131400  -10.4800 -136.8600      40.4        28       128        60
OIR    2025130    131400  -10.4800 -136.8700      40.1        28       132        60
OIR    2025130    131400  -10.4800 -136.8800      40.0        27       134        60
OIR    2025130    131400  -10.4800 -136.8900      39.9        27       134        60
OIR    2025130    131400  -10.4800 -136.9000      40.0        27       132        60
OIR    2025130    131400  -10.4800 -136.9100      40.0        27       131        60
OIR    2025130    131400  -10.4800 -136.9200      40.1        27       132        60
OIR    2025130    131400  -10.4800 -136.9300      40.2        26       134        60
OIR    2025130    131400  -10.4800 -136.9400      40.4        26       132        60
OIR    2025130    131400  -10.4800 -136.9500      40.4        25       129        60
OIR    2025130    131400  -10.4800 -136.9600      40.5        25       124        60
OIR    2025130    131400  -10.4800 -136.9700      40.5        25       121        60
OIR    2025130    131400  -10.4800 -136.9800      40.4        25       120        60
OIR    2025130    131400  -10.4800 -136.9900      40.2        24       121        60
OIR    2025130    131400  -10.4800 -137.0000      40.3        24       130        60
OIR    2025130    131400  -10.4800 -137.0100      40.0        21       136        60
OIR    2025130    131400  -10.4800 -137.0200      39.5        20       140        60
OIR    2025130    131400  -10.4800 -137.0300      39.4        19       143        60
OIR    2025130    131400  -10.4800 -137.0400      39.4        19       146        60
OIR    2025130    131400  -10.4800 -137.0500      39.3        19       145        60
OIR    2025130    131400  -10.4800 -137.0600      39.3        19       143        60
OIR    2025130    131400  -10.4800 -137.0700      39.3        19       136        60
OIR    2025130    131400  -10.4800 -137.0800      39.3        19       134        60
OIR    2025130    131400  -10.4800 -137.0900      39.1        19       136        60
OIR    2025130    131400  -10.4800 -137.1000      39.0        20       138        60
OIR    2025130    131400  -10.4800 -137.1100      39.0        20       136        60
OIR    2025130    131400  -10.4800 -137.1200      39.0        19       129        60
OIR    2025130    131400  -10.4800 -137.1300      38.9        19       119        60
OIR    2025130    131400  -10.4800 -137.1400      38.7        19       116        60
OIR    2025130    131400  -10.4800 -137.1500      38.5        18       113        60
OIR    2025130    131400  -10.4800 -137.1600      38.3        18       111        60
OIR    2025130    131400  -10.4800 -137.1700      38.2        17       110        60
OIR    2025130    131400  -10.4800 -137.1800      38.2        16       110        60
OIR    2025130    131400  -10.4800 -137.1900      38.0        16       110        60
OIR    2025130    131400  -10.4800 -137.2000      37.8        15       110        60
OIR    2025130    131400  -10.4800 -137.2100      37.3        15       109        60
OIR    2025130    131400  -10.4800 -137.2200      36.4        14       108        60
OIR    2025130    131400  -10.4800 -137.2300      35.2        13       109        60
OIR    2025130    131400  -10.4800 -137.2400      33.9        12       111        60
OIR    2025130    131400  -10.4800 -137.2500      33.2        11       112        60
OIR    2025130    131400  -10.4800 -137.2600      32.9        11       113        60
OIR    2025130    131400  -10.4800 -137.2700      32.7        10       113        60
OIR    2025130    131400  -10.4800 -137.2800      32.7        10       113        60
OIR    2025130    131400  -10.4800 -137.2900      32.6        10       111        60
OIR    2025130    131400  -10.4800 -137.3000      32.5        10       110        60
OIR    2025130    131400  -10.4800 -137.3100      32.4        10       110        60
OIR    2025130    131400  -10.4800 -137.3200      32.2         9       112        60
OIR    2025130    131400  -10.4800 -137.3300      31.6         7       115        60
OIR    2025130    131400  -10.4800 -137.3400      31.3         5       121        60
OIR    2025130    131400  -10.4800 -137.3500      31.3         5       127        60
OIR    2025130    131400  -10.4800 -137.3600      31.4         4       127        60
OIR    2025130    131400  -10.4800 -137.3700      31.5         4       121        60
OIR    2025130    131400  -10.4800 -137.3800      31.6         4       116        60
OIR    2025130    131400  -10.4800 -137.3900      31.7         4       111        60
OIR    2025130    131400  -10.4800 -137.4000      31.7         4       110        60
OIR    2025130    131400  -10.4800 -137.4100      31.8         4       110        60
OIR    2025130    131400  -10.4800 -137.4200      31.8         4       110        60
OIR    2025130    131400  -10.4800 -137.4300      31.8         4       111        60
OIR    2025130    131400  -10.4800 -137.4400      31.8         4       110        60
OIR    2025130    131400  -10.4800 -137.4500      31.8         4       112        60
OIR    2025130    131400  -10.4800 -137.4600      31.8         4       114        60
OIR    2025130    131400  -10.4800 -137.4700      31.7         4       115        60
OIR    2025130    131400  -10.4800 -137.4800      31.7         4       115        60
OIR    2025130    131400  -10.4800 -137.4900      31.7         4       113        60
OIR    2025130    131400  -10.4800 -137.5000      31.7         4       110        60
OIR    2025130    131400  -10.4800 -137.5100      31.7         4       111        60
OIR    2025130    131400  -10.4800 -137.5200      31.7         4       111        60
OIR    2025130    131400  -10.4800 -137.5300      31.7         4       115        60
OIR    2025130    131400  -10.4800 -137.5400      31.7         4       117        60
OIR    2025130    131400  -10.4800 -137.5500      31.8         4       120        60
OIR    2025130    131400  -10.4800 -137.5600      32.3         2       121        60
OIR    2025130    131400  -10.4800 -137.5700      32.8         1       122        60
OIR    2025130    131400  -10.4800 -137.5800      32.8         1       120        60
OIR    2025130    131400  -10.4800 -137.5900      32.8         1       113        60
OIR    2025130    131400  -10.4800 -137.6000      32.8         1       112        60
OIR    2025130    131400  -10.4800 -137.6100      32.8         1       111        60
OIR    2025130    131400  -10.4800 -137.6200      32.7         1       110        60
OIR    2025130    131400  -10.4800 -137.6300      32.7         1       110        60
OIR    2025130    131400  -10.4800 -137.6400      32.6         1       112        60
OIR    2025130    131400  -10.4800 -137.6500      32.4         2       114        60
OIR    2025130    131400  -10.4800 -137.6600      32.1         3       117        60
OIR    2025130    131400  -10.4800 -137.6700      31.9         3       121        60
OIR    2025130    131400  -10.4800 -137.6800      31.8         4       124        60
OIR    2025130    131400  -10.4800 -137.6900      31.7         4       125        60
OIR    2025130    131400  -10.4800 -137.7000      31.6         4       126        60
OIR    2025130    131400  -10.4800 -137.7100      31.3         4       129        60
OIR    2025130    131400  -10.4800 -137.7200      30.6         4       132        60
OIR    2025130    131400  -10.4800 -137.7300      29.0         3       133        60
OIR    2025130    131400  -10.4800 -137.7400      27.3         2       134        60
OIR    2025130    131400  -10.4800 -137.7500      26.3         1       134        60
OIR    2025130    131400  -10.4800 -137.7600      25.7         0       134        60
OIR    2025130    131400  -10.4800 -137.7700      25.1       359       134        60
OIR    2025130    131400  -10.4800 -137.7800      24.4       359       134        60
OIR    2025130    131400  -10.4800 -137.7900      23.7       358       133        60
OIR    2025130    131400  -10.4800 -137.8000      23.0       358       133        60
OIR    2025130    131400  -10.4800 -137.8100      22.2       357       133        60
OIR    2025130    131400  -10.4800 -137.8200      21.2       357       133        60
OIR    2025130    131400  -10.4800 -137.8300      20.2       357       132        60
OIR    2025130    131400  -10.4800 -137.8400      19.4       357       133        60
OIR    2025130    131400  -10.4800 -137.8500      19.0       357       134        60
OIR    2025130    131400  -10.4800 -137.8600      18.8       357       133        60
OIR    2025130    131400  -10.4800 -137.8700      18.6       357       132        60
OIR    2025130    131400  -10.4800 -137.8800      18.5       357       129        60
OIR    2025130    131400  -10.4800 -137.8900      18.5       357       127        60
OIR    2025130    131400  -10.4800 -137.9000      18.5       357       126        60
OIR    2025130    131400  -10.4800 -137.9100      18.4       356       125        60
OIR    2025130    131400  -10.4800 -137.9200      18.3       356       125        60
OIR    2025130    131400  -10.4800 -137.9300      18.5       356       126        60
OIR    2025130    131400  -10.4800 -137.9400      18.9       356       126        60
OIR    2025130    131400  -10.4800 -137.9500      19.0       356       127        60
OIR    2025130    131400  -10.4800 -137.9600      19.0       356       128        60
OIR    2025130    131400  -10.4800 -137.9700      19.0       357       127        60
OIR    2025130    131400  -10.4800 -137.9800      19.4       357       128        60
OIR    2025130    131400  -10.4800 -137.9900      20.3       356       133        60
OIR    2025130    131400  -10.4800 -138.0000      21.8       356       137        60
OIR    2025130    131400  -10.4800 -138.0100      23.5       356       140        60
OIR    2025130    131400  -10.4800 -138.0200      24.4       355       145        60
OIR    2025130    131400  -10.4800 -138.0900      22.7       349       150        60
OIR    2025130    131400  -10.4800 -138.1000      22.8       349       148        60
OIR    2025130    131400  -10.4800 -138.1100      22.9       349       145        60
OIR    2025130    131400  -10.4800 -138.1200      23.1       349       142        60
OIR    2025130    131400  -10.4800 -138.1300      23.5       349       140        60
OIR    2025130    131400  -10.4800 -138.1400      24.4       350       139        60
OIR    2025130    131400  -10.4800 -138.1500      25.4       351       138        60
OIR    2025130    131400  -10.4800 -138.1600      26.1       351       136        60
OIR    2025130    131400  -10.4800 -138.1700      26.8       352       135        60
OIR    2025130    131400  -10.4800 -138.1800      27.6       352       135        60
OIR    2025130    131400  -10.4800 -138.1900      28.2       352       137        60
OIR    2025130    131400  -10.4800 -138.2000      28.5       352       137        60
OIR    2025130    131400  -10.4800 -138.2100      28.5       352       137        60
OIR    2025130    131400  -10.4800 -138.2200      28.6       352       136        60
OIR    2025130    131400  -10.4800 -138.2300      28.6       352       133        60
OIR    2025130    131400  -10.4800 -138.2400      28.6       352       130        60
OIR    2025130    131400  -10.4800 -138.2500      28.6       352       127        60
OIR    2025130    131400  -10.4800 -138.2600      28.6       352       128        60
OIR    2025130    131400  -10.4800 -138.2700      28.5       353       130        60
OIR    2025130    131400  -10.4800 -138.2800      28.5       353       133        60
OIR    2025130    131400  -10.4800 -138.2900      28.5       353       135        60
OIR    2025130    131400  -10.4800 -138.3000      28.5       353       139        60
OIR    2025130    131400  -10.4800 -138.3100      28.5       353       142        60
OIR    2025130    131400  -10.4800 -138.3200      28.5       353       146        60
OIR    2025130    131400  -10.4800 -138.3300      28.5       353       149        60
OIR    2025130    131400  -10.4900 -136.3400      40.4        40       146        60
OIR    2025130    131400  -10.4900 -136.3500      40.8        39       147        60
OIR    2025130    131400  -10.4900 -136.3600      40.9        39       147        60
OIR    2025130    131400  -10.4900 -136.3700      41.0        39       145        60
OIR    2025130    131400  -10.4900 -136.3800      41.0        39       143        60
OIR    2025130    131400  -10.4900 -136.3900      41.0        39       141        60
OIR    2025130    131400  -10.4900 -136.4000      41.1        39       140        60
OIR    2025130    131400  -10.4900 -136.4100      41.1        39       144        60
OIR    2025130    131400  -10.4900 -136.4200      41.2        39       146        60
OIR    2025130    131400  -10.4900 -136.4300      41.2        39       147        60
OIR    2025130    131400  -10.4900 -136.4400      41.4        39       146        60
OIR    2025130    131400  -10.4900 -136.4500      41.5        39       145        60
OIR    2025130    131400  -10.4900 -136.4600      41.6        39       144        60
OIR    2025130    131400  -10.4900 -136.4700      41.6        39       143        60
OIR    2025130    131400  -10.4900 -136.4800      41.6        39       141        60
OIR    2025130    131400  -10.4900 -136.4900      41.6        39       139        60
OIR    2025130    131400  -10.4900 -136.5000      41.6        39       138        60
OIR    2025130    131400  -10.4900 -136.5100      41.6        39       138        60
OIR    2025130    131400  -10.4900 -136.5200      41.7        39       137        60
OIR    2025130    131400  -10.4900 -136.5300      41.7        39       137        60
OIR    2025130    131400  -10.4900 -136.5400      41.9        39       137        60
OIR    2025130    131400  -10.4900 -136.5500      41.9        39       140        60
OIR    2025130    131400  -10.4900 -136.5600      42.0        39       143        60
OIR    2025130    131400  -10.4900 -136.5700      42.0        39       147        60
OIR    2025130    131400  -10.4900 -136.5900      42.0        39       147        60
OIR    2025130    131400  -10.4900 -136.6000      41.9        39       144        60
OIR    2025130    131400  -10.4900 -136.6100      41.9        39       144        60
OIR    2025130    131400  -10.4900 -136.6200      41.9        38       143        60
OIR    2025130    131400  -10.4900 -136.6300      41.9        38       144        60
OIR    2025130    131400  -10.4900 -136.6400      41.9        38       145        60
OIR    2025130    131400  -10.4900 -136.6500      41.8        38       146        60
OIR    2025130    131400  -10.4900 -136.6600      41.8        38       144        60
OIR    2025130    131400  -10.4900 -136.6700      41.9        38       141        60
OIR    2025130    131400  -10.4900 -136.6800      42.0        37       141        60
OIR    2025130    131400  -10.4900 -136.6900      42.1        37       144        60
OIR    2025130    131400  -10.4900 -136.7000      42.1        37       139        60
OIR    2025130    131400  -10.4900 -136.7100      42.2        37       136        60
OIR    2025130    131400  -10.4900 -136.7200      42.1        36       137        60
OIR    2025130    131400  -10.4900 -136.7300      42.1        36       138        60
OIR    2025130    131400  -10.4900 -136.7400      42.1        36       140        60
OIR    2025130    131400  -10.4900 -136.7500      41.3        32       137        60
OIR    2025130    131400  -10.4900 -136.7600      41.4        32       128        60
OIR    2025130    131400  -10.4900 -136.7700      41.4        32       124        60
OIR    2025130    131400  -10.4900 -136.7800      41.5        32       121        60
OIR    2025130    131400  -10.4900 -136.7900      41.5        31       126        60
OIR    2025130    131400  -10.4900 -136.8000      41.5        32       136        60
OIR    2025130    131400  -10.4900 -136.8100      41.1        30       133        60
OIR    2025130    131400  -10.4900 -136.8200      40.1        28       129        60
OIR    2025130    131400  -10.4900 -136.8300      40.0        28       126        60
OIR    2025130    131400  -10.4900 -136.8400      40.1        28       123        60
OIR    2025130    131400  -10.4900 -136.8500      40.2        27       125        60
OIR    2025130    131400  -10.4900 -136.8600      40.2        27       128        60
OIR    2025130    131400  -10.4900 -136.8700      40.0        27       132        60
OIR    2025130    131400  -10.4900 -136.8800      40.0        27       135        60
OIR    2025130    131400  -10.4900 -136.8900      39.9        27       135        60
OIR    2025130    131400  -10.4900 -136.9000      39.9        27       135        60
OIR    2025130    131400  -10.4900 -136.9100      40.0        27       135        60
OIR    2025130    131400  -10.4900 -136.9200      40.0        26       136        60
OIR    2025130    131400  -10.4900 -136.9300      40.1        26       137        60
OIR    2025130    131400  -10.4900 -136.9400      40.1        25       133        60
OIR    2025130    131400  -10.4900 -136.9500      40.2        25       128        60
OIR    2025130    131400  -10.4900 -136.9600      40.2        25       125        60
OIR    2025130    131400  -10.4900 -136.9700      40.2        25       123        60
OIR    2025130    131400  -10.4900 -136.9800      40.1        24       121        60
OIR    2025130    131400  -10.4900 -136.9900      40.0        23       122        60
OIR    2025130    131400  -10.4900 -137.0000      39.9        23       127        60
OIR    2025130    131400  -10.4900 -137.0100      39.8        21       133        60
OIR    2025130    131400  -10.4900 -137.0200      39.6        20       139        60
OIR    2025130    131400  -10.4900 -137.0300      39.5        20       143        60
OIR    2025130    131400  -10.4900 -137.0400      39.4        19       148        60
OIR    2025130    131400  -10.4900 -137.0500      39.4        19       149        60
OIR    2025130    131400  -10.4900 -137.0600      39.4        19       148        60
OIR    2025130    131400  -10.4900 -137.0700      39.4        19       141        60
OIR    2025130    131400  -10.4900 -137.0800      39.3        19       137        60
OIR    2025130    131400  -10.4900 -137.0900      39.1        19       138        60
OIR    2025130    131400  -10.4900 -137.1000      39.1        20       138        60
OIR    2025130    131400  -10.4900 -137.1100      39.0        20       135        60
OIR    2025130    131400  -10.4900 -137.1200      39.0        20       129        60
OIR    2025130    131400  -10.4900 -137.1300      39.0        19       120        60
OIR    2025130    131400  -10.4900 -137.1400      38.8        18       116        60
OIR    2025130    131400  -10.4900 -137.1500      38.5        17       115        60
OIR    2025130    131400  -10.4900 -137.1600      38.3        17       113        60
OIR    2025130    131400  -10.4900 -137.1700      38.3        16       112        60
OIR    2025130    131400  -10.4900 -137.1800      38.3        16       110        60
OIR    2025130    131400  -10.4900 -137.1900      38.1        15       110        60
OIR    2025130    131400  -10.4900 -137.2000      37.8        15       111        60
OIR    2025130    131400  -10.4900 -137.2100      37.4        14       111        60
OIR    2025130    131400  -10.4900 -137.2200      36.6        13       109        60
OIR    2025130    131400  -10.4900 -137.2300      35.2        12       109        60
OIR    2025130    131400  -10.4900 -137.2400      34.1        11       110        60
OIR    2025130    131400  -10.4900 -137.2500      33.4        11       111        60
OIR    2025130    131400  -10.4900 -137.2600      33.0        10       111        60
OIR    2025130    131400  -10.4900 -137.2700      32.8        10       113        60
OIR    2025130    131400  -10.4900 -137.2800      32.8        10       113        60
OIR    2025130    131400  -10.4900 -137.2900      32.7        10       111        60
OIR    2025130    131400  -10.4900 -137.3000      32.6        10       109        60
OIR    2025130    131400  -10.4900 -137.3100      32.5         9       111        60
OIR    2025130    131400  -10.4900 -137.3200      32.4         9       113        60
OIR    2025130    131400  -10.4900 -137.3300      31.7         7       116        60
OIR    2025130    131400  -10.4900 -137.3400      31.3         5       121        60
OIR    2025130    131400  -10.4900 -137.3500      31.3         5       128        60
OIR    2025130    131400  -10.4900 -137.3600      31.4         4       129        60
OIR    2025130    131400  -10.4900 -137.3700      31.5         4       123        60
OIR    2025130    131400  -10.4900 -137.3800      31.6         4       116        60
OIR    2025130    131400  -10.4900 -137.3900      31.7         4       112        60
OIR    2025130    131400  -10.4900 -137.4000      31.8         4       111        60
OIR    2025130    131400  -10.4900 -137.4100      31.8         4       110        60
OIR    2025130    131400  -10.4900 -137.4200      31.8         4       111        60
OIR    2025130    131400  -10.4900 -137.4300      31.8         4       112        60
OIR    2025130    131400  -10.4900 -137.4400      31.8         4       112        60
OIR    2025130    131400  -10.4900 -137.4500      31.8         4       114        60
OIR    2025130    131400  -10.4900 -137.4600      31.8         4       116        60
OIR    2025130    131400  -10.4900 -137.4700      31.7         4       116        60
OIR    2025130    131400  -10.4900 -137.4800      31.7         4       117        60
OIR    2025130    131400  -10.4900 -137.4900      31.7         4       116        60
OIR    2025130    131400  -10.4900 -137.5000      31.7         4       115        60
OIR    2025130    131400  -10.4900 -137.5100      31.7         4       115        60
OIR    2025130    131400  -10.4900 -137.5200      31.7         4       115        60
OIR    2025130    131400  -10.4900 -137.5300      31.7         4       116        60
OIR    2025130    131400  -10.4900 -137.5400      31.8         4       120        60
OIR    2025130    131400  -10.4900 -137.5500      32.1         3       121        60
OIR    2025130    131400  -10.4900 -137.5600      32.7         1       121        60
OIR    2025130    131400  -10.4900 -137.5700      32.8         1       121        60
OIR    2025130    131400  -10.4900 -137.5800      32.8         1       119        60
OIR    2025130    131400  -10.4900 -137.5900      32.8         1       113        60
OIR    2025130    131400  -10.4900 -137.6000      32.8         1       111        60
OIR    2025130    131400  -10.4900 -137.6100      32.8         1       110        60
OIR    2025130    131400  -10.4900 -137.6200      32.8         1       109        60
OIR    2025130    131400  -10.4900 -137.6300      32.7         1       109        60
OIR    2025130    131400  -10.4900 -137.6400      32.7         1       112        60
OIR    2025130    131400  -10.4900 -137.6500      32.6         1       114        60
OIR    2025130    131400  -10.4900 -137.6600      32.4         2       116        60
OIR    2025130    131400  -10.4900 -137.6700      32.1         3       119        60
OIR    2025130    131400  -10.4900 -137.6800      31.9         4       122        60
OIR    2025130    131400  -10.4900 -137.6900      31.8         4       124        60
OIR    2025130    131400  -10.4900 -137.7000      31.6         4       126        60
OIR    2025130    131400  -10.4900 -137.7100      31.4         4       129        60
OIR    2025130    131400  -10.4900 -137.7200      30.7         4       131        60
OIR    2025130    131400  -10.4900 -137.7300      29.5         3       131        60
OIR    2025130    131400  -10.4900 -137.7400      28.0         1       132        60
OIR    2025130    131400  -10.4900 -137.7500      27.0         1       132        60
OIR    2025130    131400  -10.4900 -137.7600      26.4         0       132        60
OIR    2025130    131400  -10.4900 -137.7700      25.8       359       133        60
OIR    2025130    131400  -10.4900 -137.7800      25.4       359       133        60
OIR    2025130    131400  -10.4900 -137.7900      25.0       358       133        60
OIR    2025130    131400  -10.4900 -137.8000      24.5       358       132        60
OIR    2025130    131400  -10.4900 -137.8100      24.0       358       133        60
OIR    2025130    131400  -10.4900 -137.8200      23.5       358       132        60
OIR    2025130    131400  -10.4900 -137.8300      22.7       357       131        60
OIR    2025130    131400  -10.4900 -137.8400      21.5       357       131        60
OIR    2025130    131400  -10.4900 -137.8500      20.7       358       132        60
OIR    2025130    131400  -10.4900 -137.8600      20.4       358       131        60
OIR    2025130    131400  -10.4900 -137.8700      20.4       358       130        60
OIR    2025130    131400  -10.4900 -137.8800      20.5       358       128        60
OIR    2025130    131400  -10.4900 -137.8900      20.8       358       126        60
OIR    2025130    131400  -10.4900 -137.9000      21.0       357       125        60
OIR    2025130    131400  -10.4900 -137.9100      20.9       356       124        60
OIR    2025130    131400  -10.4900 -137.9200      21.0       356       123        60
OIR    2025130    131400  -10.4900 -137.9300      22.3       357       123        60
OIR    2025130    131400  -10.4900 -137.9400      23.4       357       123        60
OIR    2025130    131400  -10.4900 -137.9500      23.6       357       124        60
OIR    2025130    131400  -10.4900 -137.9600      23.3       357       125        60
OIR    2025130    131400  -10.4900 -137.9700      23.5       358       124        60
OIR    2025130    131400  -10.4900 -137.9800      24.2       358       125        60
OIR    2025130    131400  -10.4900 -137.9900      25.1       358       129        60
OIR    2025130    131400  -10.4900 -138.0000      25.4       358       134        60
OIR    2025130    131400  -10.4900 -138.0100      25.4       357       137        60
OIR    2025130    131400  -10.4900 -138.0200      25.0       356       141        60
OIR    2025130    131400  -10.4900 -138.0300      25.0       356       146        60
OIR    2025130    131400  -10.4900 -138.0900      23.9       351       148        60
OIR    2025130    131400  -10.4900 -138.1000      23.9       350       146        60
OIR    2025130    131400  -10.4900 -138.1100      24.2       350       143        60
OIR    2025130    131400  -10.4900 -138.1200      24.6       351       141        60
OIR    2025130    131400  -10.4900 -138.1300      25.1       351       140        60
OIR    2025130    131400  -10.4900 -138.1400      25.8       352       139        60
OIR    2025130    131400  -10.4900 -138.1500      26.2       352       137        60
OIR    2025130    131400  -10.4900 -138.1600      26.6       352       136        60
OIR    2025130    131400  -10.4900 -138.1700      27.0       352       135        60
OIR    2025130    131400  -10.4900 -138.1800      27.7       352       134        60
OIR    2025130    131400  -10.4900 -138.1900      28.2       352       136        60
OIR    2025130    131400  -10.4900 -138.2000      28.4       352       137        60
OIR    2025130    131400  -10.4900 -138.2100      28.5       352       136        60
OIR    2025130    131400  -10.4900 -138.2200      28.6       352       134        60
OIR    2025130    131400  -10.4900 -138.2300      28.6       352       132        60
OIR    2025130    131400  -10.4900 -138.2400      28.6       352       129        60
OIR    2025130    131400  -10.4900 -138.2500      28.6       352       128        60
OIR    2025130    131400  -10.4900 -138.2600      28.6       353       130        60
OIR    2025130    131400  -10.4900 -138.2700      28.5       353       133        60
OIR    2025130    131400  -10.4900 -138.2800      28.5       353       135        60
OIR    2025130    131400  -10.4900 -138.2900      28.5       353       136        60
OIR    2025130    131400  -10.4900 -138.3000      28.5       353       140        60
OIR    2025130    131400  -10.4900 -138.3100      28.5       353       145        60
OIR    2025130    131400  -10.4900 -138.3200      28.5       353       149        60
OIR    2025130    131400  -10.5000 -136.3400      39.9        40       147        60
OIR    2025130    131400  -10.5000 -136.3500      40.5        39       148        60
OIR    2025130    131400  -10.5000 -136.3600      40.8        39       149        60
OIR    2025130    131400  -10.5000 -136.3700      40.9        39       146        60
OIR    2025130    131400  -10.5000 -136.3800      40.9        39       144        60
OIR    2025130    131400  -10.5000 -136.3900      41.0        39       143        60
OIR    2025130    131400  -10.5000 -136.4000      41.0        39       143        60
OIR    2025130    131400  -10.5000 -136.4100      41.1        39       145        60
OIR    2025130    131400  -10.5000 -136.4200      41.2        39       144        60
OIR    2025130    131400  -10.5000 -136.4300      41.2        39       142        60
OIR    2025130    131400  -10.5000 -136.4400      41.3        39       142        60
OIR    2025130    131400  -10.5000 -136.4500      41.5        39       142        60
OIR    2025130    131400  -10.5000 -136.4600      41.5        39       143        60
OIR    2025130    131400  -10.5000 -136.4700      41.6        39       143        60
OIR    2025130    131400  -10.5000 -136.4800      41.6        39       145        60
OIR    2025130    131400  -10.5000 -136.4900      41.6        39       146        60
OIR    2025130    131400  -10.5000 -136.5000      41.6        39       144        60
OIR    2025130    131400  -10.5000 -136.5100      41.6        39       142        60
OIR    2025130    131400  -10.5000 -136.5200      41.6        39       140        60
OIR    2025130    131400  -10.5000 -136.5300      41.7        39       138        60
OIR    2025130    131400  -10.5000 -136.5400      41.7        39       137        60
OIR    2025130    131400  -10.5000 -136.5500      41.8        39       139        60
OIR    2025130    131400  -10.5000 -136.5600      41.9        39       143        60
OIR    2025130    131400  -10.5000 -136.5700      41.9        39       146        60
OIR    2025130    131400  -10.5000 -136.5800      41.9        39       149        60
OIR    2025130    131400  -10.5000 -136.5900      41.9        39       146        60
OIR    2025130    131400  -10.5000 -136.6000      41.9        38       144        60
OIR    2025130    131400  -10.5000 -136.6100      41.9        38       145        60
OIR    2025130    131400  -10.5000 -136.6200      41.9        38       147        60
OIR    2025130    131400  -10.5000 -136.6300      41.9        38       145        60
OIR    2025130    131400  -10.5000 -136.6400      41.8        38       146        60
OIR    2025130    131400  -10.5000 -136.6500      41.8        38       149        60
OIR    2025130    131400  -10.5000 -136.6600      41.9        38       147        60
OIR    2025130    131400  -10.5000 -136.6700      41.9        37       144        60
OIR    2025130    131400  -10.5000 -136.6800      42.0        37       142        60
OIR    2025130    131400  -10.5000 -136.6900      42.1        36       141        60
OIR    2025130    131400  -10.5000 -136.7000      42.2        36       139        60
OIR    2025130    131400  -10.5000 -136.7100      42.2        36       138        60
OIR    2025130    131400  -10.5000 -136.7200      42.2        36       139        60
OIR    2025130    131400  -10.5000 -136.7300      42.1        36       139        60
OIR    2025130    131400  -10.5000 -136.7400      42.1        35       139        60
OIR    2025130    131400  -10.5000 -136.7500      41.3        31       137        60
OIR    2025130    131400  -10.5000 -136.7600      41.4        31       131        60
OIR    2025130    131400  -10.5000 -136.7700      41.4        31       127        60
OIR    2025130    131400  -10.5000 -136.7800      41.4        31       123        60
OIR    2025130    131400  -10.5000 -136.7900      41.3        31       127        60
OIR    2025130    131400  -10.5000 -136.8000      41.2        31       135        60
OIR    2025130    131400  -10.5000 -136.8100      40.1        28       133        60
OIR    2025130    131400  -10.5000 -136.8200      40.0        27       131        60
OIR    2025130    131400  -10.5000 -136.8300      40.1        27       128        60
OIR    2025130    131400  -10.5000 -136.8400      40.1        27       127        60
OIR    2025130    131400  -10.5000 -136.8500      40.1        27       129        60
OIR    2025130    131400  -10.5000 -136.8600      40.1        27       132        60
OIR    2025130    131400  -10.5000 -136.8700      40.1        27       133        60
OIR    2025130    131400  -10.5000 -136.8800      40.0        27       134        60
OIR    2025130    131400  -10.5000 -136.8900      39.9        27       135        60
OIR    2025130    131400  -10.5000 -136.9000      39.9        26       136        60
OIR    2025130    131400  -10.5000 -136.9100      39.9        26       137        60
OIR    2025130    131400  -10.5000 -136.9200      40.0        26       137        60
OIR    2025130    131400  -10.5000 -136.9300      40.0        26       137        60
OIR    2025130    131400  -10.5000 -136.9400      40.0        25       130        60
OIR    2025130    131400  -10.5000 -136.9500      39.9        24       122        60
OIR    2025130    131400  -10.5000 -136.9600      39.9        24       125        60
OIR    2025130    131400  -10.5000 -136.9700      39.9        24       126        60
OIR    2025130    131400  -10.5000 -136.9800      39.9        23       126        60
OIR    2025130    131400  -10.5000 -136.9900      39.8        23       126        60
OIR    2025130    131400  -10.5000 -137.0000      39.7        22       127        60
OIR    2025130    131400  -10.5000 -137.0100      39.7        21       132        60
OIR    2025130    131400  -10.5000 -137.0200      39.7        20       139        60
OIR    2025130    131400  -10.5000 -137.0300      39.7        20       142        60
OIR    2025130    131400  -10.5000 -137.0400      39.6        20       146        60
OIR    2025130    131400  -10.5000 -137.0500      39.5        19       148        60
OIR    2025130    131400  -10.5000 -137.0700      39.4        19       141        60
OIR    2025130    131400  -10.5000 -137.0800      39.4        19       137        60
OIR    2025130    131400  -10.5000 -137.0900      39.2        19       137        60
OIR    2025130    131400  -10.5000 -137.1000      39.1        19       135        60
OIR    2025130    131400  -10.5000 -137.1100      39.1        20       130        60
OIR    2025130    131400  -10.5000 -137.1200      39.1        19       124        60
OIR    2025130    131400  -10.5000 -137.1300      39.3        19       116        60
OIR    2025130    131400  -10.5000 -137.1400      39.5        16       116        60
OIR    2025130    131400  -10.5000 -137.1500      39.5        15       117        60
OIR    2025130    131400  -10.5000 -137.1600      39.5        14       116        60
OIR    2025130    131400  -10.5000 -137.1700      39.2        14       115        60
OIR    2025130    131400  -10.5000 -137.1800      38.9        15       112        60
OIR    2025130    131400  -10.5000 -137.1900      38.6        15       110        60
OIR    2025130    131400  -10.5000 -137.2000      38.2        14       111        60
OIR    2025130    131400  -10.5000 -137.2100      37.7        13       111        60
OIR    2025130    131400  -10.5000 -137.2200      37.2        12       110        60
OIR    2025130    131400  -10.5000 -137.2300      35.9        11       111        60
OIR    2025130    131400  -10.5000 -137.2400      34.8        11       113        60
OIR    2025130    131400  -10.5000 -137.2500      34.0        10       114        60
OIR    2025130    131400  -10.5000 -137.2600      33.4        10       114        60
OIR    2025130    131400  -10.5000 -137.2700      33.0        10       115        60
OIR    2025130    131400  -10.5000 -137.2800      33.0        10       114        60
OIR    2025130    131400  -10.5000 -137.2900      32.9        10       113        60
OIR    2025130    131400  -10.5000 -137.3000      32.9        10       112        60
OIR    2025130    131400  -10.5000 -137.3100      32.8         9       115        60
OIR    2025130    131400  -10.5000 -137.3200      32.7         9       117        60
OIR    2025130    131400  -10.5000 -137.3300      32.3         8       122        60
OIR    2025130    131400  -10.5000 -137.3400      31.7         6       125        60
OIR    2025130    131400  -10.5000 -137.3500      31.5         4       129        60
OIR    2025130    131400  -10.5000 -137.3600      31.6         4       129        60
OIR    2025130    131400  -10.5000 -137.3700      31.8         3       125        60
OIR    2025130    131400  -10.5000 -137.3800      32.1         3       119        60
OIR    2025130    131400  -10.5000 -137.3900      32.2         3       114        60
OIR    2025130    131400  -10.5000 -137.4000      32.3         3       113        60
OIR    2025130    131400  -10.5000 -137.4100      32.4         4       112        60
OIR    2025130    131400  -10.5000 -137.4200      32.6         3       112        60
OIR    2025130    131400  -10.5000 -137.4300      32.7         3       113        60
OIR    2025130    131400  -10.5000 -137.4400      32.6         3       115        60
OIR    2025130    131400  -10.5000 -137.4500      32.2         4       116        60
OIR    2025130    131400  -10.5000 -137.4600      31.9         4       116        60
OIR    2025130    131400  -10.5000 -137.4700      31.8         4       119        60
OIR    2025130    131400  -10.5000 -137.4800      31.8         4       122        60
OIR    2025130    131400  -10.5000 -137.4900      31.8         3       122        60
OIR    2025130    131400  -10.5000 -137.5000      31.8         3       121        60
OIR    2025130    131400  -10.5000 -137.5100      31.9         3       120        60
OIR    2025130    131400  -10.5000 -137.5200      31.8         4       120        60
OIR    2025130    131400  -10.5000 -137.5300      31.8         3       120        60
OIR    2025130    131400  -10.5000 -137.5400      32.0         3       121        60
OIR    2025130    131400  -10.5000 -137.5500      32.6         1       122        60
OIR    2025130    131400  -10.5000 -137.5600      32.8         1       121        60
OIR    2025130    131400  -10.5000 -137.5700      32.8         1       119        60
OIR    2025130    131400  -10.5000 -137.5800      32.8         1       116        60
OIR    2025130    131400  -10.5000 -137.5900      32.8         1       114        60
OIR    2025130    131400  -10.5000 -137.6000      32.8         1       112        60
OIR    2025130    131400  -10.5000 -137.6100      32.8         1       109        60
OIR    2025130    131400  -10.5000 -137.6200      32.8         1       109        60
OIR    2025130    131400  -10.5000 -137.6300      32.8         1       110        60
OIR    2025130    131400  -10.5000 -137.6400      32.7         1       112        60
OIR    2025130    131400  -10.5000 -137.6500      32.7         1       114        60
OIR    2025130    131400  -10.5000 -137.6600      32.5         2       114        60
OIR    2025130    131400  -10.5000 -137.6700      32.2         3       116        60
OIR    2025130    131400  -10.5000 -137.6800      32.0         3       117        60
OIR    2025130    131400  -10.5000 -137.6900      31.8         4       122        60
OIR    2025130    131400  -10.5000 -137.7000      31.7         4       127        60
OIR    2025130    131400  -10.5000 -137.7100      31.5         4       129        60
OIR    2025130    131400  -10.5000 -137.7200      31.0         3       131        60
OIR    2025130    131400  -10.5000 -137.7300      29.8         3       131        60
OIR    2025130    131400  -10.5000 -137.7400      28.6         1       131        60
OIR    2025130    131400  -10.5000 -137.7500      27.7         1       130        60
OIR    2025130    131400  -10.5000 -137.7600      27.0         0       130        60
OIR    2025130    131400  -10.5000 -137.7700      26.3       359       130        60
OIR    2025130    131400  -10.5000 -137.7800      26.0       359       131        60
OIR    2025130    131400  -10.5000 -137.7900      25.7       358       131        60
OIR    2025130    131400  -10.5000 -137.8000      25.5       358       132        60
OIR    2025130    131400  -10.5000 -137.8100      25.3       358       132        60
OIR    2025130    131400  -10.5000 -137.8200      25.2       358       131        60
OIR    2025130    131400  -10.5000 -137.8300      25.1       358       129        60
OIR    2025130    131400  -10.5000 -137.8400      24.7       358       131        60
OIR    2025130    131400  -10.5000 -137.8500      24.1       358       132        60
OIR    2025130    131400  -10.5000 -137.8600      23.6       358       131        60
OIR    2025130    131400  -10.5000 -137.8700      23.6       358       130        60
OIR    2025130    131400  -10.5000 -137.8800      23.7       358       127        60
OIR    2025130    131400  -10.5000 -137.8900      23.9       357       125        60
OIR    2025130    131400  -10.5000 -137.9000      24.0       357       124        60
OIR    2025130    131400  -10.5000 -137.9100      24.3       357       123        60
OIR    2025130    131400  -10.5000 -137.9200      25.0       357       122        60
OIR    2025130    131400  -10.5000 -137.9300      25.5       358       121        60
OIR    2025130    131400  -10.5000 -137.9400      25.7       358       120        60
OIR    2025130    131400  -10.5000 -137.9500      25.7       358       120        60
OIR    2025130    131400  -10.5000 -137.9600      25.6       358       120        60
OIR    2025130    131400  -10.5000 -137.9700      25.6       358       122        60
OIR    2025130    131400  -10.5000 -137.9800      25.7       358       124        60
OIR    2025130    131400  -10.5000 -137.9900      25.8       358       128        60
OIR    2025130    131400  -10.5000 -138.0000      25.9       358       131        60
OIR    2025130    131400  -10.5000 -138.0100      25.9       357       133        60
OIR    2025130    131400  -10.5000 -138.0200      25.5       356       135        60
OIR    2025130    131400  -10.5000 -138.0300      25.2       356       137        60
OIR    2025130    131400  -10.5000 -138.0400      25.2       356       142        60
OIR    2025130    131400  -10.5000 -138.0500      25.2       356       146        60
OIR    2025130    131400  -10.5000 -138.0600      25.3       356       149        60
OIR    2025130    131400  -10.5000 -138.0800      24.9       354       147        60
OIR    2025130    131400  -10.5000 -138.0900      24.9       353       144        60
OIR    2025130    131400  -10.5000 -138.1000      25.0       352       143        60
OIR    2025130    131400  -10.5000 -138.1100      25.3       352       141        60
OIR    2025130    131400  -10.5000 -138.1200      25.7       352       139        60
OIR    2025130    131400  -10.5000 -138.1300      26.1       353       139        60
OIR    2025130    131400  -10.5000 -138.1400      26.3       353       140        60
OIR    2025130    131400  -10.5000 -138.1500      26.5       353       138        60
OIR    2025130    131400  -10.5000 -138.1600      26.7       352       135        60
OIR    2025130    131400  -10.5000 -138.1700      27.0       352       135        60
OIR    2025130    131400  -10.5000 -138.1800      27.6       352       135        60
OIR    2025130    131400  -10.5000 -138.1900      28.2       352       135        60
OIR    2025130    131400  -10.5000 -138.2000      28.4       352       135        60
OIR    2025130    131400  -10.5000 -138.2100      28.5       352       133        60
OIR    2025130    131400  -10.5000 -138.2200      28.6       352       132        60
OIR    2025130    131400  -10.5000 -138.2300      28.6       352       130        60
OIR    2025130    131400  -10.5000 -138.2400      28.6       352       129        60
OIR    2025130    131400  -10.5000 -138.2500      28.6       353       130        60
OIR    2025130    131400  -10.5000 -138.2600      28.6       353       132        60
OIR    2025130    131400  -10.5000 -138.2700      28.5       353       135        60
OIR    2025130    131400  -10.5000 -138.2800      28.5       353       136        60
OIR    2025130    131400  -10.5000 -138.2900      28.5       353       137        60
OIR    2025130    131400  -10.5000 -138.3000      28.6       353       142        60
OIR    2025130    131400  -10.5000 -138.3100      28.6       353       147        60
OIR    2025130    131400  -10.5100 -136.3400      39.7        40       148        60
OIR    2025130    131400  -10.5100 -136.3500      40.3        39       149        60
OIR    2025130    131400  -10.5100 -136.3700      40.8        39       147        60
OIR    2025130    131400  -10.5100 -136.3800      40.9        39       145        60
OIR    2025130    131400  -10.5100 -136.3900      40.9        39       146        60
OIR    2025130    131400  -10.5100 -136.4000      41.0        39       146        60
OIR    2025130    131400  -10.5100 -136.4100      41.0        39       146        60
OIR    2025130    131400  -10.5100 -136.4200      41.1        39       144        60
OIR    2025130    131400  -10.5100 -136.4300      41.2        39       139        60
OIR    2025130    131400  -10.5100 -136.4400      41.3        39       139        60
OIR    2025130    131400  -10.5100 -136.4500      41.5        39       140        60
OIR    2025130    131400  -10.5100 -136.4600      41.5        39       142        60
OIR    2025130    131400  -10.5100 -136.4700      41.6        39       145        60
OIR    2025130    131400  -10.5100 -136.4800      41.6        39       148        60
OIR    2025130    131400  -10.5100 -136.5000      41.5        39       148        60
OIR    2025130    131400  -10.5100 -136.5100      41.5        39       145        60
OIR    2025130    131400  -10.5100 -136.5200      41.6        39       142        60
OIR    2025130    131400  -10.5100 -136.5300      41.6        39       139        60
OIR    2025130    131400  -10.5100 -136.5400      41.7        38       137        60
OIR    2025130    131400  -10.5100 -136.5500      41.8        39       140        60
OIR    2025130    131400  -10.5100 -136.5600      41.9        39       145        60
OIR    2025130    131400  -10.5100 -136.5700      41.9        39       147        60
OIR    2025130    131400  -10.5100 -136.5800      41.9        39       147        60
OIR    2025130    131400  -10.5100 -136.5900      41.9        38       146        60
OIR    2025130    131400  -10.5100 -136.6000      41.9        38       145        60
OIR    2025130    131400  -10.5100 -136.6100      41.9        38       147        60
OIR    2025130    131400  -10.5100 -136.6200      41.9        38       148        60
OIR    2025130    131400  -10.5100 -136.6300      41.9        38       146        60
OIR    2025130    131400  -10.5100 -136.6400      41.8        38       147        60
OIR    2025130    131400  -10.5100 -136.6700      41.9        37       146        60
OIR    2025130    131400  -10.5100 -136.6800      42.1        36       144        60
OIR    2025130    131400  -10.5100 -136.6900      42.1        36       141        60
OIR    2025130    131400  -10.5100 -136.7000      42.1        36       141        60
OIR    2025130    131400  -10.5100 -136.7100      42.2        36       141        60
OIR    2025130    131400  -10.5100 -136.7200      42.1        36       140        60
OIR    2025130    131400  -10.5100 -136.7300      42.1        35       140        60
OIR    2025130    131400  -10.5100 -136.7400      41.9        34       139        60
OIR    2025130    131400  -10.5100 -136.7500      41.3        32       136        60
OIR    2025130    131400  -10.5100 -136.7600      41.3        31       132        60
OIR    2025130    131400  -10.5100 -136.7700      41.3        31       128        60
OIR    2025130    131400  -10.5100 -136.7800      41.3        31       125        60
OIR    2025130    131400  -10.5100 -136.7900      41.0        31       127        60
OIR    2025130    131400  -10.5100 -136.8000      40.8        30       133        60
OIR    2025130    131400  -10.5100 -136.8100      40.0        27       133        60
OIR    2025130    131400  -10.5100 -136.8200      40.0        27       133        60
OIR    2025130    131400  -10.5100 -136.8300      40.0        27       131        60
OIR    2025130    131400  -10.5100 -136.8400      40.0        27       130        60
OIR    2025130    131400  -10.5100 -136.8500      40.0        27       133        60
OIR    2025130    131400  -10.5100 -136.8600      40.1        27       134        60
OIR    2025130    131400  -10.5100 -136.8700      40.1        26       133        60
OIR    2025130    131400  -10.5100 -136.8800      40.1        26       134        60
OIR    2025130    131400  -10.5100 -136.8900      40.0        26       134        60
OIR    2025130    131400  -10.5100 -136.9000      40.0        26       135        60
OIR    2025130    131400  -10.5100 -136.9100      39.9        26       137        60
OIR    2025130    131400  -10.5100 -136.9200      40.0        25       137        60
OIR    2025130    131400  -10.5100 -136.9300      40.0        25       137        60
OIR    2025130    131400  -10.5100 -136.9400      39.9        24       129        60
OIR    2025130    131400  -10.5100 -136.9500      39.8        24       120        60
OIR    2025130    131400  -10.5100 -136.9600      39.8        23       126        60
OIR    2025130    131400  -10.5100 -136.9700      39.7        23       128        60
OIR    2025130    131400  -10.5100 -136.9800      39.7        23       128        60
OIR    2025130    131400  -10.5100 -136.9900      39.7        23       128        60
OIR    2025130    131400  -10.5100 -137.0000      39.7        22       128        60
OIR    2025130    131400  -10.5100 -137.0100      39.7        21       132        60
OIR    2025130    131400  -10.5100 -137.0200      39.7        20       138        60
OIR    2025130    131400  -10.5100 -137.0300      39.7        20       141        60
OIR    2025130    131400  -10.5100 -137.0400      39.6        20       144        60
OIR    2025130    131400  -10.5100 -137.0500      39.6        19       146        60
OIR    2025130    131400  -10.5100 -137.0600      39.5        19       148        60
OIR    2025130    131400  -10.5100 -137.0700      39.5        19       141        60
OIR    2025130    131400  -10.5100 -137.0800      39.4        19       137        60
OIR    2025130    131400  -10.5100 -137.0900      39.3        19       136        60
OIR    2025130    131400  -10.5100 -137.1000      39.1        19       134        60
OIR    2025130    131400  -10.5100 -137.1100      39.1        19       127        60
OIR    2025130    131400  -10.5100 -137.1200      39.2        19       122        60
OIR    2025130    131400  -10.5100 -137.1300      39.6        17       116        60
OIR    2025130    131400  -10.5100 -137.1400      39.9        15       120        60
OIR    2025130    131400  -10.5100 -137.1500      39.8        14       122        60
OIR    2025130    131400  -10.5100 -137.1600      39.7        14       120        60
OIR    2025130    131400  -10.5100 -137.1700      39.6        14       116        60
OIR    2025130    131400  -10.5100 -137.1800      39.3        14       114        60
OIR    2025130    131400  -10.5100 -137.1900      39.1        14       112        60
OIR    2025130    131400  -10.5100 -137.2000      38.9        13       113        60
OIR    2025130    131400  -10.5100 -137.2100      38.7        13       114        60
OIR    2025130    131400  -10.5100 -137.2200      38.2        11       114        60
OIR    2025130    131400  -10.5100 -137.2300      38.1        10       114        60
OIR    2025130    131400  -10.5100 -137.2400      37.4        10       114        60
OIR    2025130    131400  -10.5100 -137.2500      36.2         9       116        60
OIR    2025130    131400  -10.5100 -137.2600      35.1        10       117        60
OIR    2025130    131400  -10.5100 -137.2700      34.2        10       117        60
OIR    2025130    131400  -10.5100 -137.2800      33.5        10       116        60
OIR    2025130    131400  -10.5100 -137.2900      33.2        10       115        60
OIR    2025130    131400  -10.5100 -137.3000      33.2         9       115        60
OIR    2025130    131400  -10.5100 -137.3100      33.4         9       116        60
OIR    2025130    131400  -10.5100 -137.3200      33.7         9       120        60
OIR    2025130    131400  -10.5100 -137.3300      33.9         7       123        60
OIR    2025130    131400  -10.5100 -137.3400      33.7         5       125        60
OIR    2025130    131400  -10.5100 -137.3500      33.5         4       126        60
OIR    2025130    131400  -10.5100 -137.3600      33.2         3       126        60
OIR    2025130    131400  -10.5100 -137.3700      32.8         2       125        60
OIR    2025130    131400  -10.5100 -137.3800      32.7         2       121        60
OIR    2025130    131400  -10.5100 -137.3900      33.1         2       116        60
OIR    2025130    131400  -10.5100 -137.4000      34.7         2       116        60
OIR    2025130    131400  -10.5100 -137.4100      35.1         2       115        60
OIR    2025130    131400  -10.5100 -137.4200      34.6         2       114        60
OIR    2025130    131400  -10.5100 -137.4300      34.0         2       115        60
OIR    2025130    131400  -10.5100 -137.4400      33.7         2       116        60
OIR    2025130    131400  -10.5100 -137.4500      33.3         3       117        60
OIR    2025130    131400  -10.5100 -137.4600      33.1         2       119        60
OIR    2025130    131400  -10.5100 -137.4700      33.3         2       121        60
OIR    2025130    131400  -10.5100 -137.4800      33.4         2       125        60
OIR    2025130    131400  -10.5100 -137.4900      33.4         1       127        60
OIR    2025130    131400  -10.5100 -137.5000      34.1         1       127        60
OIR    2025130    131400  -10.5100 -137.5100      33.7         1       125        60
OIR    2025130    131400  -10.5100 -137.5200      32.9         2       124        60
OIR    2025130    131400  -10.5100 -137.5300      32.6         2       123        60
OIR    2025130    131400  -10.5100 -137.5400      32.7         2       122        60
OIR    2025130    131400  -10.5100 -137.5500      32.9         1       123        60
OIR    2025130    131400  -10.5100 -137.5600      32.9         1       122        60
OIR    2025130    131400  -10.5100 -137.5700      32.9         1       119        60
OIR    2025130    131400  -10.5100 -137.5800      32.9         1       116        60
OIR    2025130    131400  -10.5100 -137.5900      32.9         1       115        60
OIR    2025130    131400  -10.5100 -137.6000      32.8         1       112        60
OIR    2025130    131400  -10.5100 -137.6100      32.8         1       109        60
OIR    2025130    131400  -10.5100 -137.6200      32.8         1       109        60
OIR    2025130    131400  -10.5100 -137.6300      32.8         1       109        60
OIR    2025130    131400  -10.5100 -137.6400      32.8         1       111        60
OIR    2025130    131400  -10.5100 -137.6500      32.7         1       113        60
OIR    2025130    131400  -10.5100 -137.6600      32.6         2       112        60
OIR    2025130    131400  -10.5100 -137.6700      32.4         3       114        60
OIR    2025130    131400  -10.5100 -137.6800      32.2         3       116        60
OIR    2025130    131400  -10.5100 -137.6900      32.0         3       120        60
OIR    2025130    131400  -10.5100 -137.7000      31.8         3       126        60
OIR    2025130    131400  -10.5100 -137.7100      31.6         4       129        60
OIR    2025130    131400  -10.5100 -137.7200      31.1         3       131        60
OIR    2025130    131400  -10.5100 -137.7300      30.0         2       130        60
OIR    2025130    131400  -10.5100 -137.7400      28.9         1       130        60
OIR    2025130    131400  -10.5100 -137.7500      28.1         0       128        60
OIR    2025130    131400  -10.5100 -137.7600      27.6       360       127        60
OIR    2025130    131400  -10.5100 -137.7700      26.8       359       128        60
OIR    2025130    131400  -10.5100 -137.7800      26.4       359       128        60
OIR    2025130    131400  -10.5100 -137.7900      26.2       358       129        60
OIR    2025130    131400  -10.5100 -137.8000      26.1       358       130        60
OIR    2025130    131400  -10.5100 -137.8100      26.1       358       131        60
OIR    2025130    131400  -10.5100 -137.8200      26.1       358       130        60
OIR    2025130    131400  -10.5100 -137.8300      26.0       358       129        60
OIR    2025130    131400  -10.5100 -137.8400      26.0       357       130        60
OIR    2025130    131400  -10.5100 -137.8500      25.9       357       131        60
OIR    2025130    131400  -10.5100 -137.8600      25.8       357       131        60
OIR    2025130    131400  -10.5100 -137.8700      25.6       357       130        60
OIR    2025130    131400  -10.5100 -137.8800      25.5       357       128        60
OIR    2025130    131400  -10.5100 -137.8900      25.5       357       127        60
OIR    2025130    131400  -10.5100 -137.9000      25.5       357       125        60
OIR    2025130    131400  -10.5100 -137.9100      25.6       357       123        60
OIR    2025130    131400  -10.5100 -137.9200      25.8       357       122        60
OIR    2025130    131400  -10.5100 -137.9300      25.9       358       120        60
OIR    2025130    131400  -10.5100 -137.9400      25.9       358       117        60
OIR    2025130    131400  -10.5100 -137.9500      25.9       358       117        60
OIR    2025130    131400  -10.5100 -137.9600      25.9       358       117        60
OIR    2025130    131400  -10.5100 -137.9700      25.9       358       121        60
OIR    2025130    131400  -10.5100 -137.9800      25.9       358       124        60
OIR    2025130    131400  -10.5100 -137.9900      26.0       358       127        60
OIR    2025130    131400  -10.5100 -138.0000      26.0       357       129        60
OIR    2025130    131400  -10.5100 -138.0100      26.1       357       131        60
OIR    2025130    131400  -10.5100 -138.0200      25.9       357       131        60
OIR    2025130    131400  -10.5100 -138.0300      25.7       356       131        60
OIR    2025130    131400  -10.5100 -138.0400      25.4       356       134        60
OIR    2025130    131400  -10.5100 -138.0500      25.4       356       138        60
OIR    2025130    131400  -10.5100 -138.0600      25.6       356       141        60
OIR    2025130    131400  -10.5100 -138.0700      25.7       356       144        60
OIR    2025130    131400  -10.5100 -138.0800      25.7       356       143        60
OIR    2025130    131400  -10.5100 -138.0900      25.7       355       142        60
OIR    2025130    131400  -10.5100 -138.1000      25.7       354       141        60
OIR    2025130    131400  -10.5100 -138.1100      25.8       353       140        60
OIR    2025130    131400  -10.5100 -138.1200      26.1       353       138        60
OIR    2025130    131400  -10.5100 -138.1300      26.3       353       138        60
OIR    2025130    131400  -10.5100 -138.1400      26.4       353       138        60
OIR    2025130    131400  -10.5100 -138.1500      26.5       353       137        60
OIR    2025130    131400  -10.5100 -138.1600      26.6       353       136        60
OIR    2025130    131400  -10.5100 -138.1700      26.9       353       135        60
OIR    2025130    131400  -10.5100 -138.1800      27.4       352       135        60
OIR    2025130    131400  -10.5100 -138.1900      28.0       352       134        60
OIR    2025130    131400  -10.5100 -138.2000      28.3       352       133        60
OIR    2025130    131400  -10.5100 -138.2100      28.5       352       132        60
OIR    2025130    131400  -10.5100 -138.2200      28.5       352       130        60
OIR    2025130    131400  -10.5100 -138.2300      28.6       353       129        60
OIR    2025130    131400  -10.5100 -138.2400      28.6       353       130        60
OIR    2025130    131400  -10.5100 -138.2500      28.6       353       131        60
OIR    2025130    131400  -10.5100 -138.2600      28.6       353       133        60
OIR    2025130    131400  -10.5100 -138.2700      28.6       353       136        60
OIR    2025130    131400  -10.5100 -138.2800      28.6       353       138        60
OIR    2025130    131400  -10.5100 -138.2900      28.6       353       141        60
OIR    2025130    131400  -10.5100 -138.3000      28.6       353       145        60
OIR    2025130    131400  -10.5100 -138.3100      28.6       353       149        60
OIR    2025130    131400  -10.5200 -136.3700      40.8        39       148        60
OIR    2025130    131400  -10.5200 -136.3800      40.9        39       146        60
OIR    2025130    131400  -10.5200 -136.3900      40.9        39       147        60
OIR    2025130    131400  -10.5200 -136.4000      41.0        39       148        60
OIR    2025130    131400  -10.5200 -136.4100      41.0        39       149        60
OIR    2025130    131400  -10.5200 -136.4200      41.1        39       147        60
OIR    2025130    131400  -10.5200 -136.4300      41.2        39       142        60
OIR    2025130    131400  -10.5200 -136.4400      41.4        39       140        60
OIR    2025130    131400  -10.5200 -136.4500      41.5        39       140        60
OIR    2025130    131400  -10.5200 -136.4600      41.6        39       144        60
OIR    2025130    131400  -10.5200 -136.4700      41.6        39       149        60
OIR    2025130    131400  -10.5200 -136.5000      41.5        39       149        60
OIR    2025130    131400  -10.5200 -136.5100      41.5        38       147        60
OIR    2025130    131400  -10.5200 -136.5200      41.5        38       144        60
OIR    2025130    131400  -10.5200 -136.5300      41.6        38       141        60
OIR    2025130    131400  -10.5200 -136.5400      41.7        38       139        60
OIR    2025130    131400  -10.5200 -136.5500      41.8        38       142        60
OIR    2025130    131400  -10.5200 -136.5600      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.5700      41.9        38       148        60
OIR    2025130    131400  -10.5200 -136.5800      41.9        38       146        60
OIR    2025130    131400  -10.5200 -136.5900      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.6000      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.6100      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.6200      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.6300      41.9        38       147        60
OIR    2025130    131400  -10.5200 -136.6400      41.8        38       148        60
OIR    2025130    131400  -10.5200 -136.6700      42.1        36       148        60
OIR    2025130    131400  -10.5200 -136.6800      42.2        36       147        60
OIR    2025130    131400  -10.5200 -136.6900      42.2        36       147        60
OIR    2025130    131400  -10.5200 -136.7000      42.2        36       144        60
OIR    2025130    131400  -10.5200 -136.7100      42.1        36       142        60
OIR    2025130    131400  -10.5200 -136.7200      42.1        35       141        60
OIR    2025130    131400  -10.5200 -136.7300      42.0        34       141        60
OIR    2025130    131400  -10.5200 -136.7400      41.8        33       138        60
OIR    2025130    131400  -10.5200 -136.7500      41.5        31       135        60
OIR    2025130    131400  -10.5200 -136.7600      41.4        31       131        60
OIR    2025130    131400  -10.5200 -136.7700      41.4        31       127        60
OIR    2025130    131400  -10.5200 -136.7800      41.3        31       124        60
OIR    2025130    131400  -10.5200 -136.7900      40.7        29       126        60
OIR    2025130    131400  -10.5200 -136.8000      40.5        28       131        60
OIR    2025130    131400  -10.5200 -136.8100      40.3        27       134        60
OIR    2025130    131400  -10.5200 -136.8200      40.1        27       135        60
OIR    2025130    131400  -10.5200 -136.8300      40.0        26       134        60
OIR    2025130    131400  -10.5200 -136.8400      40.0        26       134        60
OIR    2025130    131400  -10.5200 -136.8500      40.0        26       135        60
OIR    2025130    131400  -10.5200 -136.8600      40.1        26       135        60
OIR    2025130    131400  -10.5200 -136.8700      40.2        26       133        60
OIR    2025130    131400  -10.5200 -136.8800      40.2        26       132        60
OIR    2025130    131400  -10.5200 -136.8900      40.2        26       132        60
OIR    2025130    131400  -10.5200 -136.9000      40.1        25       133        60
OIR    2025130    131400  -10.5200 -136.9100      40.0        25       135        60
OIR    2025130    131400  -10.5200 -136.9200      40.0        25       135        60
OIR    2025130    131400  -10.5200 -136.9300      39.9        24       136        60
OIR    2025130    131400  -10.5200 -136.9400      39.8        23       130        60
OIR    2025130    131400  -10.5200 -136.9500      39.8        23       125        60
OIR    2025130    131400  -10.5200 -136.9600      39.8        23       127        60
OIR    2025130    131400  -10.5200 -136.9700      39.7        23       128        60
OIR    2025130    131400  -10.5200 -136.9800      39.7        22       128        60
OIR    2025130    131400  -10.5200 -136.9900      39.7        22       128        60
OIR    2025130    131400  -10.5200 -137.0000      39.8        21       128        60
OIR    2025130    131400  -10.5200 -137.0100      39.8        21       130        60
OIR    2025130    131400  -10.5200 -137.0200      39.8        20       134        60
OIR    2025130    131400  -10.5200 -137.0300      39.8        20       138        60
OIR    2025130    131400  -10.5200 -137.0400      39.8        20       143        60
OIR    2025130    131400  -10.5200 -137.0500      39.7        19       143        60
OIR    2025130    131400  -10.5200 -137.0600      39.6        19       142        60
OIR    2025130    131400  -10.5200 -137.0700      39.6        19       138        60
OIR    2025130    131400  -10.5200 -137.0800      39.6        19       136        60
OIR    2025130    131400  -10.5200 -137.0900      39.5        19       136        60
OIR    2025130    131400  -10.5200 -137.1000      39.3        19       134        60
OIR    2025130    131400  -10.5200 -137.1100      39.3        19       127        60
OIR    2025130    131400  -10.5200 -137.1200      39.7        17       125        60
OIR    2025130    131400  -10.5200 -137.1300      40.1        15       125        60
OIR    2025130    131400  -10.5200 -137.1400      40.1        14       126        60
OIR    2025130    131400  -10.5200 -137.1500      40.0        14       127        60
OIR    2025130    131400  -10.5200 -137.1600      39.9        14       123        60
OIR    2025130    131400  -10.5200 -137.1700      40.0        13       117        60
OIR    2025130    131400  -10.5200 -137.1800      39.9        13       116        60
OIR    2025130    131400  -10.5200 -137.1900      39.8        13       115        60
OIR    2025130    131400  -10.5200 -137.2000      39.6        13       116        60
OIR    2025130    131400  -10.5200 -137.2100      39.6        12       119        60
OIR    2025130    131400  -10.5200 -137.2200      39.5        11       121        60
OIR    2025130    131400  -10.5200 -137.2300      39.4        10       119        60
OIR    2025130    131400  -10.5200 -137.2400      39.0         9       115        60
OIR    2025130    131400  -10.5200 -137.2500      38.2         9       117        60
OIR    2025130    131400  -10.5200 -137.2600      37.0         9       120        60
OIR    2025130    131400  -10.5200 -137.2700      36.0         9       122        60
OIR    2025130    131400  -10.5200 -137.2800      35.5         9       122        60
OIR    2025130    131400  -10.5200 -137.2900      35.1         9       120        60
OIR    2025130    131400  -10.5200 -137.3000      34.4         8       119        60
OIR    2025130    131400  -10.5200 -137.3100      34.7         8       119        60
OIR    2025130    131400  -10.5200 -137.3200      35.1         7       117        60
OIR    2025130    131400  -10.5200 -137.3300      35.2         6       117        60
OIR    2025130    131400  -10.5200 -137.3400      35.2         5       117        60
OIR    2025130    131400  -10.5200 -137.3500      35.5         4       119        60
OIR    2025130    131400  -10.5200 -137.3600      35.7         3       120        60
OIR    2025130    131400  -10.5200 -137.3700      35.8         2       122        60
OIR    2025130    131400  -10.5200 -137.3800      36.3         2       121        60
OIR    2025130    131400  -10.5200 -137.3900      36.8         1       119        60
OIR    2025130    131400  -10.5200 -137.4000      37.0         1       117        60
OIR    2025130    131400  -10.5200 -137.4100      36.9         1       117        60
OIR    2025130    131400  -10.5200 -137.4200      36.6         1       119        60
OIR    2025130    131400  -10.5200 -137.4300      35.8         1       119        60
OIR    2025130    131400  -10.5200 -137.4400      35.3         1       119        60
OIR    2025130    131400  -10.5200 -137.4500      35.1         1       119        60
OIR    2025130    131400  -10.5200 -137.4600      35.5         1       119        60
OIR    2025130    131400  -10.5200 -137.4700      35.9         0       122        60
OIR    2025130    131400  -10.5200 -137.4800      36.2         0       128        60
OIR    2025130    131400  -10.5200 -137.4900      36.1         0       130        60
OIR    2025130    131400  -10.5200 -137.5000      35.9         0       132        60
OIR    2025130    131400  -10.5200 -137.5100      35.3         0       130        60
OIR    2025130    131400  -10.5200 -137.5200      33.6         1       128        60
OIR    2025130    131400  -10.5200 -137.5300      33.2         1       124        60
OIR    2025130    131400  -10.5200 -137.5400      33.2         1       122        60
OIR    2025130    131400  -10.5200 -137.5500      33.1         1       124        60
OIR    2025130    131400  -10.5200 -137.5600      33.0         1       123        60
OIR    2025130    131400  -10.5200 -137.5700      32.9         1       121        60
OIR    2025130    131400  -10.5200 -137.5800      32.9         1       117        60
OIR    2025130    131400  -10.5200 -137.5900      32.9         1       116        60
OIR    2025130    131400  -10.5200 -137.6000      32.9         1       113        60
OIR    2025130    131400  -10.5200 -137.6100      32.9         1       110        60
OIR    2025130    131400  -10.5200 -137.6200      32.9         1       109        60
OIR    2025130    131400  -10.5200 -137.6300      32.8         1       108        60
OIR    2025130    131400  -10.5200 -137.6400      32.8         1       110        60
OIR    2025130    131400  -10.5200 -137.6500      32.8         1       112        60
OIR    2025130    131400  -10.5200 -137.6600      32.7         1       112        60
OIR    2025130    131400  -10.5200 -137.6700      32.6         2       113        60
OIR    2025130    131400  -10.5200 -137.6800      32.4         3       114        60
OIR    2025130    131400  -10.5200 -137.6900      32.1         3       117        60
OIR    2025130    131400  -10.5200 -137.7000      31.9         3       125        60
OIR    2025130    131400  -10.5200 -137.7100      31.6         3       128        60
OIR    2025130    131400  -10.5200 -137.7200      31.2         3       130        60
OIR    2025130    131400  -10.5200 -137.7300      30.2         2       129        60
OIR    2025130    131400  -10.5200 -137.7400      29.3         1       128        60
OIR    2025130    131400  -10.5200 -137.7500      28.5         0       125        60
OIR    2025130    131400  -10.5200 -137.7600      27.9       360       124        60
OIR    2025130    131400  -10.5200 -137.7700      27.4       359       125        60
OIR    2025130    131400  -10.5200 -137.7800      26.8       358       126        60
OIR    2025130    131400  -10.5200 -137.7900      26.5       358       126        60
OIR    2025130    131400  -10.5200 -137.8000      26.4       358       127        60
OIR    2025130    131400  -10.5200 -137.8100      26.3       358       130        60
OIR    2025130    131400  -10.5200 -137.8200      26.3       358       130        60
OIR    2025130    131400  -10.5200 -137.8300      26.2       357       129        60
OIR    2025130    131400  -10.5200 -137.8400      26.2       357       129        60
OIR    2025130    131400  -10.5200 -137.8500      26.2       357       129        60
OIR    2025130    131400  -10.5200 -137.8600      26.1       357       130        60
OIR    2025130    131400  -10.5200 -137.8700      26.1       357       131        60
OIR    2025130    131400  -10.5200 -137.8800      26.0       357       131        60
OIR    2025130    131400  -10.5200 -137.8900      26.0       357       129        60
OIR    2025130    131400  -10.5200 -137.9000      26.0       357       127        60
OIR    2025130    131400  -10.5200 -137.9100      26.0       357       124        60
OIR    2025130    131400  -10.5200 -137.9200      26.0       357       122        60
OIR    2025130    131400  -10.5200 -137.9300      26.0       357       120        60
OIR    2025130    131400  -10.5200 -137.9400      26.0       358       117        60
OIR    2025130    131400  -10.5200 -137.9500      26.0       358       117        60
OIR    2025130    131400  -10.5200 -137.9600      26.0       358       117        60
OIR    2025130    131400  -10.5200 -137.9700      26.0       358       120        60
OIR    2025130    131400  -10.5200 -137.9800      26.0       358       123        60
OIR    2025130    131400  -10.5200 -137.9900      26.1       358       125        60
OIR    2025130    131400  -10.5200 -138.0000      26.1       358       127        60
OIR    2025130    131400  -10.5200 -138.0100      26.2       357       130        60
OIR    2025130    131400  -10.5200 -138.0200      26.2       357       129        60
OIR    2025130    131400  -10.5200 -138.0300      26.3       357       127        60
OIR    2025130    131400  -10.5200 -138.0400      26.4       357       128        60
OIR    2025130    131400  -10.5200 -138.0500      26.4       357       129        60
OIR    2025130    131400  -10.5200 -138.0600      26.2       357       132        60
OIR    2025130    131400  -10.5200 -138.0700      26.2       357       135        60
OIR    2025130    131400  -10.5200 -138.0800      26.2       357       139        60
OIR    2025130    131400  -10.5200 -138.0900      26.0       355       141        60
OIR    2025130    131400  -10.5200 -138.1000      26.0       354       140        60
OIR    2025130    131400  -10.5200 -138.1100      26.1       354       139        60
OIR    2025130    131400  -10.5200 -138.1200      26.2       353       138        60
OIR    2025130    131400  -10.5200 -138.1300      26.3       353       137        60
OIR    2025130    131400  -10.5200 -138.1400      26.4       353       136        60
OIR    2025130    131400  -10.5200 -138.1500      26.5       353       136        60
OIR    2025130    131400  -10.5200 -138.1600      26.6       353       137        60
OIR    2025130    131400  -10.5200 -138.1700      26.7       353       136        60
OIR    2025130    131400  -10.5200 -138.1800      27.2       353       134        60
OIR    2025130    131400  -10.5200 -138.1900      27.8       353       133        60
OIR    2025130    131400  -10.5200 -138.2000      28.1       353       132        60
OIR    2025130    131400  -10.5200 -138.2100      28.3       353       131        60
OIR    2025130    131400  -10.5200 -138.2200      28.4       353       130        60
OIR    2025130    131400  -10.5200 -138.2300      28.5       353       130        60
OIR    2025130    131400  -10.5200 -138.2400      28.5       353       130        60
OIR    2025130    131400  -10.5200 -138.2500      28.6       353       132        60
OIR    2025130    131400  -10.5200 -138.2600      28.6       353       134        60
OIR    2025130    131400  -10.5200 -138.2700      28.6       353       136        60
OIR    2025130    131400  -10.5200 -138.2800      28.6       353       141        60
OIR    2025130    131400  -10.5200 -138.2900      28.6       353       148        60
OIR    2025130    131400  -10.5200 -138.3000      28.6       353       149        60
OIR    2025130    131400  -10.5300 -136.3800      40.9        39       148        60
OIR    2025130    131400  -10.5300 -136.3900      40.9        39       149        60
OIR    2025130    131400  -10.5300 -136.4200      41.3        38       149        60
OIR    2025130    131400  -10.5300 -136.4300      41.4        38       143        60
OIR    2025130    131400  -10.5300 -136.4400      41.6        38       141        60
OIR    2025130    131400  -10.5300 -136.4500      41.8        38       141        60
OIR    2025130    131400  -10.5300 -136.4600      42.0        38       145        60
OIR    2025130    131400  -10.5300 -136.4700      42.0        38       148        60
OIR    2025130    131400  -10.5300 -136.4800      42.0        38       148        60
OIR    2025130    131400  -10.5300 -136.4900      41.9        38       147        60
OIR    2025130    131400  -10.5300 -136.5000      41.8        38       148        60
OIR    2025130    131400  -10.5300 -136.5100      41.6        38       147        60
OIR    2025130    131400  -10.5300 -136.5200      41.6        38       145        60
OIR    2025130    131400  -10.5300 -136.5300      41.6        38       143        60
OIR    2025130    131400  -10.5300 -136.5400      41.7        38       142        60
OIR    2025130    131400  -10.5300 -136.5500      41.8        38       144        60
OIR    2025130    131400  -10.5300 -136.5600      41.8        38       148        60
OIR    2025130    131400  -10.5300 -136.5700      41.9        38       148        60
OIR    2025130    131400  -10.5300 -136.5800      41.9        38       146        60
OIR    2025130    131400  -10.5300 -136.5900      41.9        38       148        60
OIR    2025130    131400  -10.5300 -136.6100      41.9        37       148        60
OIR    2025130    131400  -10.5300 -136.6200      41.9        37       147        60
OIR    2025130    131400  -10.5300 -136.6300      41.9        37       148        60
OIR    2025130    131400  -10.5300 -136.6700      42.2        36       149        60
OIR    2025130    131400  -10.5300 -136.6800      42.2        36       148        60
OIR    2025130    131400  -10.5300 -136.6900      42.3        35       149        60
OIR    2025130    131400  -10.5300 -136.7000      42.2        35       146        60
OIR    2025130    131400  -10.5300 -136.7100      42.1        35       144        60
OIR    2025130    131400  -10.5300 -136.7200      42.1        34       142        60
OIR    2025130    131400  -10.5300 -136.7300      42.0        33       141        60
OIR    2025130    131400  -10.5300 -136.7400      41.8        32       137        60
OIR    2025130    131400  -10.5300 -136.7500      41.6        31       133        60
OIR    2025130    131400  -10.5300 -136.7600      41.5        31       128        60
OIR    2025130    131400  -10.5300 -136.7700      41.5        31       125        60
OIR    2025130    131400  -10.5300 -136.7800      41.3        30       123        60
OIR    2025130    131400  -10.5300 -136.7900      40.7        28       124        60
OIR    2025130    131400  -10.5300 -136.8000      40.5        27       127        60
OIR    2025130    131400  -10.5300 -136.8100      40.3        27       131        60
OIR    2025130    131400  -10.5300 -136.8200      40.2        26       134        60
OIR    2025130    131400  -10.5300 -136.8300      40.1        26       134        60
OIR    2025130    131400  -10.5300 -136.8400      40.1        25       135        60
OIR    2025130    131400  -10.5300 -136.8500      40.0        25       136        60
OIR    2025130    131400  -10.5300 -136.8600      40.1        25       136        60
OIR    2025130    131400  -10.5300 -136.8700      40.2        25       132        60
OIR    2025130    131400  -10.5300 -136.8800      40.2        25       131        60
OIR    2025130    131400  -10.5300 -136.8900      40.2        25       130        60
OIR    2025130    131400  -10.5300 -136.9000      40.2        25       131        60
OIR    2025130    131400  -10.5300 -136.9100      40.1        24       133        60
OIR    2025130    131400  -10.5300 -136.9200      40.0        24       134        60
OIR    2025130    131400  -10.5300 -136.9300      39.9        23       135        60
OIR    2025130    131400  -10.5300 -136.9400      39.8        23       130        60
OIR    2025130    131400  -10.5300 -136.9500      39.8        23       126        60
OIR    2025130    131400  -10.5300 -136.9600      39.8        22       127        60
OIR    2025130    131400  -10.5300 -136.9700      39.8        22       127        60
OIR    2025130    131400  -10.5300 -136.9800      39.7        22       126        60
OIR    2025130    131400  -10.5300 -136.9900      39.8        21       126        60
OIR    2025130    131400  -10.5300 -137.0000      39.8        21       127        60
OIR    2025130    131400  -10.5300 -137.0100      39.9        21       130        60
OIR    2025130    131400  -10.5300 -137.0200      39.9        20       134        60
OIR    2025130    131400  -10.5300 -137.0300      39.8        20       137        60
OIR    2025130    131400  -10.5300 -137.0400      39.8        20       141        60
OIR    2025130    131400  -10.5300 -137.0500      39.8        19       141        60
OIR    2025130    131400  -10.5300 -137.0600      39.7        19       140        60
OIR    2025130    131400  -10.5300 -137.0700      39.7        19       138        60
OIR    2025130    131400  -10.5300 -137.0800      39.6        19       138        60
OIR    2025130    131400  -10.5300 -137.0900      39.6        19       139        60
OIR    2025130    131400  -10.5300 -137.1000      39.6        19       137        60
OIR    2025130    131400  -10.5300 -137.1100      39.9        18       129        60
OIR    2025130    131400  -10.5300 -137.1200      40.3        16       128        60
OIR    2025130    131400  -10.5300 -137.1300      40.3        15       129        60
OIR    2025130    131400  -10.5300 -137.1400      40.3        14       128        60
OIR    2025130    131400  -10.5300 -137.1500      40.2        14       127        60
OIR    2025130    131400  -10.5300 -137.1600      40.1        13       123        60
OIR    2025130    131400  -10.5300 -137.1700      40.1        13       119        60
OIR    2025130    131400  -10.5300 -137.1800      40.0        13       117        60
OIR    2025130    131400  -10.5300 -137.1900      40.0        13       119        60
OIR    2025130    131400  -10.5300 -137.2000      40.0        12       120        60
OIR    2025130    131400  -10.5300 -137.2100      40.0        11       121        60
OIR    2025130    131400  -10.5300 -137.2200      39.9        10       123        60
OIR    2025130    131400  -10.5300 -137.2300      39.7        10       120        60
OIR    2025130    131400  -10.5300 -137.2400      39.7         9       116        60
OIR    2025130    131400  -10.5300 -137.2500      39.4         9       119        60
OIR    2025130    131400  -10.5300 -137.2600      38.9         9       121        60
OIR    2025130    131400  -10.5300 -137.2700      38.0         9       121        60
OIR    2025130    131400  -10.5300 -137.2800      36.9         8       120        60
OIR    2025130    131400  -10.5300 -137.2900      36.4         8       119        60
OIR    2025130    131400  -10.5300 -137.3000      35.8         7       120        60
OIR    2025130    131400  -10.5300 -137.3100      35.8         6       120        60
OIR    2025130    131400  -10.5300 -137.3200      36.0         6       120        60
OIR    2025130    131400  -10.5300 -137.3300      36.2         5       116        60
OIR    2025130    131400  -10.5300 -137.3400      36.2         4       115        60
OIR    2025130    131400  -10.5300 -137.3500      36.3         3       115        60
OIR    2025130    131400  -10.5300 -137.3600      36.4         3       116        60
OIR    2025130    131400  -10.5300 -137.3700      36.7         2       119        60
OIR    2025130    131400  -10.5300 -137.3800      37.0         1       116        60
OIR    2025130    131400  -10.5300 -137.3900      37.1         1       115        60
OIR    2025130    131400  -10.5300 -137.4000      37.1         1       115        60
OIR    2025130    131400  -10.5300 -137.4100      37.0         1       116        60
OIR    2025130    131400  -10.5300 -137.4200      37.0         1       116        60
OIR    2025130    131400  -10.5300 -137.4300      36.9         1       116        60
OIR    2025130    131400  -10.5300 -137.4400      36.8         1       115        60
OIR    2025130    131400  -10.5300 -137.4500      36.7         1       115        60
OIR    2025130    131400  -10.5300 -137.4600      36.6         0       116        60
OIR    2025130    131400  -10.5300 -137.4700      36.5         0       119        60
OIR    2025130    131400  -10.5300 -137.4800      36.4         0       125        60
OIR    2025130    131400  -10.5300 -137.4900      36.3         0       128        60
OIR    2025130    131400  -10.5300 -137.5000      36.2         0       130        60
OIR    2025130    131400  -10.5300 -137.5100      35.9         0       127        60
OIR    2025130    131400  -10.5300 -137.5200      35.0         0       125        60
OIR    2025130    131400  -10.5300 -137.5300      34.0         1       122        60
OIR    2025130    131400  -10.5300 -137.5400      33.6         1       120        60
OIR    2025130    131400  -10.5300 -137.5500      33.4         1       122        60
OIR    2025130    131400  -10.5300 -137.5600      33.1         1       122        60
OIR    2025130    131400  -10.5300 -137.5700      33.0         1       120        60
OIR    2025130    131400  -10.5300 -137.5800      33.0         1       117        60
OIR    2025130    131400  -10.5300 -137.5900      32.9         1       116        60
OIR    2025130    131400  -10.5300 -137.6000      32.9         1       113        60
OIR    2025130    131400  -10.5300 -137.6100      32.9         1       110        60
OIR    2025130    131400  -10.5300 -137.6200      32.9         1       109        60
OIR    2025130    131400  -10.5300 -137.6300      32.9         1       109        60
OIR    2025130    131400  -10.5300 -137.6400      32.9         1       110        60
OIR    2025130    131400  -10.5300 -137.6500      32.9         1       111        60
OIR    2025130    131400  -10.5300 -137.6600      32.8         1       112        60
OIR    2025130    131400  -10.5300 -137.6700      32.7         2       113        60
OIR    2025130    131400  -10.5300 -137.6800      32.6         2       114        60
OIR    2025130    131400  -10.5300 -137.6900      32.3         3       116        60
OIR    2025130    131400  -10.5300 -137.7000      32.0         3       124        60
OIR    2025130    131400  -10.5300 -137.7100      31.6         3       126        60
OIR    2025130    131400  -10.5300 -137.7200      31.2         2       128        60
OIR    2025130    131400  -10.5300 -137.7300      30.4         2       127        60
OIR    2025130    131400  -10.5300 -137.7400      29.6         1       127        60
OIR    2025130    131400  -10.5300 -137.7500      28.8         0       124        60
OIR    2025130    131400  -10.5300 -137.7600      28.2       359       123        60
OIR    2025130    131400  -10.5300 -137.7700      27.6       359       124        60
OIR    2025130    131400  -10.5300 -137.7800      27.1       358       124        60
OIR    2025130    131400  -10.5300 -137.7900      26.7       358       124        60
OIR    2025130    131400  -10.5300 -137.8000      26.5       358       126        60
OIR    2025130    131400  -10.5300 -137.8100      26.4       358       129        60
OIR    2025130    131400  -10.5300 -137.8200      26.4       358       129        60
OIR    2025130    131400  -10.5300 -137.8300      26.3       357       129        60
OIR    2025130    131400  -10.5300 -137.8400      26.3       357       129        60
OIR    2025130    131400  -10.5300 -137.8500      26.3       357       129        60
OIR    2025130    131400  -10.5300 -137.8600      26.2       357       130        60
OIR    2025130    131400  -10.5300 -137.8700      26.2       357       131        60
OIR    2025130    131400  -10.5300 -137.8800      26.2       357       131        60
OIR    2025130    131400  -10.5300 -137.8900      26.2       357       129        60
OIR    2025130    131400  -10.5300 -137.9000      26.2       357       127        60
OIR    2025130    131400  -10.5300 -137.9100      26.2       357       125        60
OIR    2025130    131400  -10.5300 -137.9200      26.2       357       122        60
OIR    2025130    131400  -10.5300 -137.9300      26.2       357       120        60
OIR    2025130    131400  -10.5300 -137.9400      26.2       358       119        60
OIR    2025130    131400  -10.5300 -137.9500      26.1       358       119        60
OIR    2025130    131400  -10.5300 -137.9600      26.1       358       119        60
OIR    2025130    131400  -10.5300 -137.9700      26.1       358       121        60
OIR    2025130    131400  -10.5300 -137.9800      26.1       358       123        60
OIR    2025130    131400  -10.5300 -137.9900      26.2       358       125        60
OIR    2025130    131400  -10.5300 -138.0000      26.2       358       127        60
OIR    2025130    131400  -10.5300 -138.0100      26.3       357       128        60
OIR    2025130    131400  -10.5300 -138.0200      26.4       357       128        60
OIR    2025130    131400  -10.5300 -138.0300      26.5       357       125        60
OIR    2025130    131400  -10.5300 -138.0400      26.5       357       125        60
OIR    2025130    131400  -10.5300 -138.0500      26.6       357       126        60
OIR    2025130    131400  -10.5300 -138.0600      26.6       357       128        60
OIR    2025130    131400  -10.5300 -138.0700      26.5       357       130        60
OIR    2025130    131400  -10.5300 -138.0800      26.5       357       135        60
OIR    2025130    131400  -10.5300 -138.0900      26.5       356       138        60
OIR    2025130    131400  -10.5300 -138.1000      26.3       355       138        60
OIR    2025130    131400  -10.5300 -138.1100      26.2       354       138        60
OIR    2025130    131400  -10.5300 -138.1200      26.3       354       138        60
OIR    2025130    131400  -10.5300 -138.1300      26.3       353       137        60
OIR    2025130    131400  -10.5300 -138.1400      26.4       353       137        60
OIR    2025130    131400  -10.5300 -138.1500      26.4       353       137        60
OIR    2025130    131400  -10.5300 -138.1600      26.5       353       138        60
OIR    2025130    131400  -10.5300 -138.1700      26.7       353       136        60
OIR    2025130    131400  -10.5300 -138.1800      27.1       354       133        60
OIR    2025130    131400  -10.5300 -138.1900      27.6       354       132        60
OIR    2025130    131400  -10.5300 -138.2000      27.8       354       131        60
OIR    2025130    131400  -10.5300 -138.2100      28.0       354       130        60
OIR    2025130    131400  -10.5300 -138.2200      28.2       354       129        60
OIR    2025130    131400  -10.5300 -138.2300      28.3       354       131        60
OIR    2025130    131400  -10.5300 -138.2400      28.4       354       133        60
OIR    2025130    131400  -10.5300 -138.2500      28.5       354       135        60
OIR    2025130    131400  -10.5300 -138.2600      28.5       353       138        60
OIR    2025130    131400  -10.5300 -138.2700      28.6       353       141        60
OIR    2025130    131400  -10.5300 -138.2800      28.6       353       145        60
OIR    2025130    131400  -10.5300 -138.2900      28.6       353       149        60
OIR    2025130    131400  -10.5400 -136.4200      41.8        37       149        60
OIR    2025130    131400  -10.5400 -136.4300      41.8        37       143        60
OIR    2025130    131400  -10.5400 -136.4400      42.0        37       142        60
OIR    2025130    131400  -10.5400 -136.4500      42.1        37       143        60
OIR    2025130    131400  -10.5400 -136.4600      42.2        37       143        60
OIR    2025130    131400  -10.5400 -136.4700      42.2        37       144        60
OIR    2025130    131400  -10.5400 -136.4800      42.2        37       143        60
OIR    2025130    131400  -10.5400 -136.4900      42.1        37       142        60
OIR    2025130    131400  -10.5400 -136.5000      42.1        37       144        60
OIR    2025130    131400  -10.5400 -136.5100      41.9        37       145        60
OIR    2025130    131400  -10.5400 -136.5200      41.8        37       146        60
OIR    2025130    131400  -10.5400 -136.5300      41.8        37       146        60
OIR    2025130    131400  -10.5400 -136.5400      41.9        37       144        60
OIR    2025130    131400  -10.5400 -136.5500      42.0        37       146        60
OIR    2025130    131400  -10.5400 -136.5600      42.0        37       148        60
OIR    2025130    131400  -10.5400 -136.5700      41.9        37       147        60
OIR    2025130    131400  -10.5400 -136.5800      41.9        37       146        60
OIR    2025130    131400  -10.5400 -136.6200      42.0        37       148        60
OIR    2025130    131400  -10.5400 -136.6600      42.1        35       149        60
OIR    2025130    131400  -10.5400 -136.6700      42.2        35       148        60
OIR    2025130    131400  -10.5400 -136.6800      42.2        35       147        60
OIR    2025130    131400  -10.5400 -136.6900      42.3        35       147        60
OIR    2025130    131400  -10.5400 -136.7000      42.3        35       147        60
OIR    2025130    131400  -10.5400 -136.7100      42.2        34       146        60
OIR    2025130    131400  -10.5400 -136.7200      42.0        33       143        60
OIR    2025130    131400  -10.5400 -136.7300      41.9        31       140        60
OIR    2025130    131400  -10.5400 -136.7400      41.9        31       135        60
OIR    2025130    131400  -10.5400 -136.7500      41.8        30       130        60
OIR    2025130    131400  -10.5400 -136.7600      41.8        30       124        60
OIR    2025130    131400  -10.5400 -136.7700      41.8        30       123        60
OIR    2025130    131400  -10.5400 -136.7800      41.5        29       123        60
OIR    2025130    131400  -10.5400 -136.7900      40.9        28       123        60
OIR    2025130    131400  -10.5400 -136.8000      40.6        27       122        60
OIR    2025130    131400  -10.5400 -136.8100      40.4        26       125        60
OIR    2025130    131400  -10.5400 -136.8200      40.2        25       129        60
OIR    2025130    131400  -10.5400 -136.8300      40.1        25       132        60
OIR    2025130    131400  -10.5400 -136.8400      40.1        25       134        60
OIR    2025130    131400  -10.5400 -136.8500      40.0        25       137        60
OIR    2025130    131400  -10.5400 -136.8600      40.1        25       137        60
OIR    2025130    131400  -10.5400 -136.8700      40.2        24       133        60
OIR    2025130    131400  -10.5400 -136.8800      40.2        24       131        60
OIR    2025130    131400  -10.5400 -136.8900      40.3        24       129        60
OIR    2025130    131400  -10.5400 -136.9000      40.2        24       130        60
OIR    2025130    131400  -10.5400 -136.9100      40.1        24       132        60
OIR    2025130    131400  -10.5400 -136.9200      40.0        23       133        60
OIR    2025130    131400  -10.5400 -136.9300      39.9        23       133        60
OIR    2025130    131400  -10.5400 -136.9400      39.9        22       129        60
OIR    2025130    131400  -10.5400 -136.9500      39.9        22       125        60
OIR    2025130    131400  -10.5400 -136.9600      39.9        22       126        60
OIR    2025130    131400  -10.5400 -136.9700      39.9        22       126        60
OIR    2025130    131400  -10.5400 -136.9800      39.8        21       124        60
OIR    2025130    131400  -10.5400 -136.9900      39.8        21       123        60
OIR    2025130    131400  -10.5400 -137.0000      39.9        21       126        60
OIR    2025130    131400  -10.5400 -137.0100      39.9        20       130        60
OIR    2025130    131400  -10.5400 -137.0200      39.9        20       136        60
OIR    2025130    131400  -10.5400 -137.0300      39.9        20       137        60
OIR    2025130    131400  -10.5400 -137.0400      39.9        20       138        60
OIR    2025130    131400  -10.5400 -137.0500      39.8        19       140        60
OIR    2025130    131400  -10.5400 -137.0600      39.8        19       142        60
OIR    2025130    131400  -10.5400 -137.0700      39.8        19       141        60
OIR    2025130    131400  -10.5400 -137.0800      39.8        19       142        60
OIR    2025130    131400  -10.5400 -137.0900      39.9        18       143        60
OIR    2025130    131400  -10.5400 -137.1000      40.2        18       142        60
OIR    2025130    131400  -10.5400 -137.1100      40.6        16       134        60
OIR    2025130    131400  -10.5400 -137.1200      40.7        15       131        60
OIR    2025130    131400  -10.5400 -137.1300      40.7        14       131        60
OIR    2025130    131400  -10.5400 -137.1400      40.6        14       126        60
OIR    2025130    131400  -10.5400 -137.1500      40.5        14       122        60
OIR    2025130    131400  -10.5400 -137.1600      40.3        13       121        60
OIR    2025130    131400  -10.5400 -137.1700      40.3        13       121        60
OIR    2025130    131400  -10.5400 -137.1800      40.2        13       121        60
OIR    2025130    131400  -10.5400 -137.1900      40.1        13       121        60
OIR    2025130    131400  -10.5400 -137.2000      40.3        12       121        60
OIR    2025130    131400  -10.5400 -137.2100      40.2        11       120        60
OIR    2025130    131400  -10.5400 -137.2200      40.1        11       116        60
OIR    2025130    131400  -10.5400 -137.2300      40.0        10       116        60
OIR    2025130    131400  -10.5400 -137.2400      40.0         9       116        60
OIR    2025130    131400  -10.5400 -137.2500      39.9         9       119        60
OIR    2025130    131400  -10.5400 -137.2600      39.6         9       121        60
OIR    2025130    131400  -10.5400 -137.2700      39.1         9       119        60
OIR    2025130    131400  -10.5400 -137.2800      38.3         8       116        60
OIR    2025130    131400  -10.5400 -137.2900      37.5         8       117        60
OIR    2025130    131400  -10.5400 -137.3000      36.9         6       120        60
OIR    2025130    131400  -10.5400 -137.3100      36.7         5       123        60
OIR    2025130    131400  -10.5400 -137.3200      36.7         5       122        60
OIR    2025130    131400  -10.5400 -137.3300      36.7         4       115        60
OIR    2025130    131400  -10.5400 -137.3400      36.8         3       113        60
OIR    2025130    131400  -10.5400 -137.3500      36.9         3       113        60
OIR    2025130    131400  -10.5400 -137.3600      37.0         2       114        60
OIR    2025130    131400  -10.5400 -137.3700      37.3         2       115        60
OIR    2025130    131400  -10.5400 -137.3800      37.3         1       112        60
OIR    2025130    131400  -10.5400 -137.3900      37.3         1       109        60
OIR    2025130    131400  -10.5400 -137.4000      37.3         1       111        60
OIR    2025130    131400  -10.5400 -137.4100      37.3         1       112        60
OIR    2025130    131400  -10.5400 -137.4200      37.1         1       112        60
OIR    2025130    131400  -10.5400 -137.4300      37.0         1       112        60
OIR    2025130    131400  -10.5400 -137.4400      37.0         0       110        60
OIR    2025130    131400  -10.5400 -137.4500      36.9         0       110        60
OIR    2025130    131400  -10.5400 -137.4600      36.7         0       111        60
OIR    2025130    131400  -10.5400 -137.4700      36.6         0       115        60
OIR    2025130    131400  -10.5400 -137.4800      36.5         0       121        60
OIR    2025130    131400  -10.5400 -137.4900      36.4         0       124        60
OIR    2025130    131400  -10.5400 -137.5000      36.3         0       126        60
OIR    2025130    131400  -10.5400 -137.5100      36.1         0       123        60
OIR    2025130    131400  -10.5400 -137.5200      35.5         0       119        60
OIR    2025130    131400  -10.5400 -137.5300      34.7         0       117        60
OIR    2025130    131400  -10.5400 -137.5400      34.2         1       117        60
OIR    2025130    131400  -10.5400 -137.5500      33.8         1       119        60
OIR    2025130    131400  -10.5400 -137.5600      33.5         0       119        60
OIR    2025130    131400  -10.5400 -137.5700      33.2         0       117        60
OIR    2025130    131400  -10.5400 -137.5800      33.1         0       117        60
OIR    2025130    131400  -10.5400 -137.5900      33.1         0       119        60
OIR    2025130    131400  -10.5400 -137.6000      33.0         0       114        60
OIR    2025130    131400  -10.5400 -137.6100      32.9         0       109        60
OIR    2025130    131400  -10.5400 -137.6200      32.9         0       109        60
OIR    2025130    131400  -10.5400 -137.6300      32.9         0       110        60
OIR    2025130    131400  -10.5400 -137.6400      32.9         1       110        60
OIR    2025130    131400  -10.5400 -137.6500      32.9         1       111        60
OIR    2025130    131400  -10.5400 -137.6600      32.9         1       112        60
OIR    2025130    131400  -10.5400 -137.6700      32.8         1       113        60
OIR    2025130    131400  -10.5400 -137.6800      32.7         2       114        60
OIR    2025130    131400  -10.5400 -137.6900      32.5         2       117        60
OIR    2025130    131400  -10.5400 -137.7000      32.1         2       123        60
OIR    2025130    131400  -10.5400 -137.7100      31.7         2       124        60
OIR    2025130    131400  -10.5400 -137.7200      31.3         2       124        60
OIR    2025130    131400  -10.5400 -137.7300      30.7         1       125        60
OIR    2025130    131400  -10.5400 -137.7400      29.9         1       126        60
OIR    2025130    131400  -10.5400 -137.7500      29.2       360       123        60
OIR    2025130    131400  -10.5400 -137.7600      28.5       359       121        60
OIR    2025130    131400  -10.5400 -137.7700      27.9       359       123        60
OIR    2025130    131400  -10.5400 -137.7800      27.3       358       124        60
OIR    2025130    131400  -10.5400 -137.7900      26.9       358       123        60
OIR    2025130    131400  -10.5400 -137.8000      26.7       358       125        60
OIR    2025130    131400  -10.5400 -137.8100      26.5       358       128        60
OIR    2025130    131400  -10.5400 -137.8200      26.5       358       129        60
OIR    2025130    131400  -10.5400 -137.8300      26.4       357       129        60
OIR    2025130    131400  -10.5400 -137.8400      26.4       357       130        60
OIR    2025130    131400  -10.5400 -137.8500      26.3       357       131        60
OIR    2025130    131400  -10.5400 -137.8600      26.3       357       131        60
OIR    2025130    131400  -10.5400 -137.8700      26.3       357       131        60
OIR    2025130    131400  -10.5400 -137.8800      26.3       357       131        60
OIR    2025130    131400  -10.5400 -137.8900      26.3       357       129        60
OIR    2025130    131400  -10.5400 -137.9000      26.3       357       127        60
OIR    2025130    131400  -10.5400 -137.9100      26.3       357       125        60
OIR    2025130    131400  -10.5400 -137.9200      26.3       357       123        60
OIR    2025130    131400  -10.5400 -137.9300      26.3       357       121        60
OIR    2025130    131400  -10.5400 -137.9400      26.2       357       120        60
OIR    2025130    131400  -10.5400 -137.9500      26.2       358       120        60
OIR    2025130    131400  -10.5400 -137.9600      26.2       358       121        60
OIR    2025130    131400  -10.5400 -137.9700      26.2       358       123        60
OIR    2025130    131400  -10.5400 -137.9800      26.2       358       124        60
OIR    2025130    131400  -10.5400 -137.9900      26.3       358       125        60
OIR    2025130    131400  -10.5400 -138.0000      26.4       358       126        60
OIR    2025130    131400  -10.5400 -138.0100      26.4       357       127        60
OIR    2025130    131400  -10.5400 -138.0200      26.5       357       126        60
OIR    2025130    131400  -10.5400 -138.0300      26.5       357       124        60
OIR    2025130    131400  -10.5400 -138.0400      26.6       357       124        60
OIR    2025130    131400  -10.5400 -138.0500      26.6       357       125        60
OIR    2025130    131400  -10.5400 -138.0600      26.6       357       126        60
OIR    2025130    131400  -10.5400 -138.0700      26.6       357       127        60
OIR    2025130    131400  -10.5400 -138.0800      26.6       357       131        60
OIR    2025130    131400  -10.5400 -138.0900      26.6       357       134        60
OIR    2025130    131400  -10.5400 -138.1000      26.6       357       136        60
OIR    2025130    131400  -10.5400 -138.1100      26.5       356       138        60
OIR    2025130    131400  -10.5400 -138.1200      26.3       354       138        60
OIR    2025130    131400  -10.5400 -138.1300      26.3       354       138        60
OIR    2025130    131400  -10.5400 -138.1400      26.3       353       139        60
OIR    2025130    131400  -10.5400 -138.1500      26.4       353       139        60
OIR    2025130    131400  -10.5400 -138.1600      26.5       354       139        60
OIR    2025130    131400  -10.5400 -138.1700      26.7       354       136        60
OIR    2025130    131400  -10.5400 -138.1800      27.0       354       133        60
OIR    2025130    131400  -10.5400 -138.1900      27.4       354       132        60
OIR    2025130    131400  -10.5400 -138.2000      27.6       355       131        60
OIR    2025130    131400  -10.5400 -138.2100      27.8       355       130        60
OIR    2025130    131400  -10.5400 -138.2200      28.0       354       129        60
OIR    2025130    131400  -10.5400 -138.2300      28.1       354       132        60
OIR    2025130    131400  -10.5400 -138.2400      28.2       355       136        60
OIR    2025130    131400  -10.5400 -138.2500      28.3       355       139        60
OIR    2025130    131400  -10.5400 -138.2600      28.4       354       143        60
OIR    2025130    131400  -10.5400 -138.2700      28.5       354       147        60
OIR    2025130    131400  -10.5400 -138.2800      28.5       354       148        60
OIR    2025130    131400  -10.5400 -138.2900      28.6       354       149        60
OIR    2025130    131400  -10.5500 -136.4200      42.2        36       148        60
OIR    2025130    131400  -10.5500 -136.4300      42.2        36       143        60
OIR    2025130    131400  -10.5500 -136.4400      42.2        37       143        60
OIR    2025130    131400  -10.5500 -136.4500      42.2        37       144        60
OIR    2025130    131400  -10.5500 -136.4600      42.2        37       144        60
OIR    2025130    131400  -10.5500 -136.4700      42.2        37       144        60
OIR    2025130    131400  -10.5500 -136.4800      42.2        37       142        60
OIR    2025130    131400  -10.5500 -136.4900      42.2        36       140        60
OIR    2025130    131400  -10.5500 -136.5000      42.1        37       142        60
OIR    2025130    131400  -10.5500 -136.5100      42.1        37       144        60
OIR    2025130    131400  -10.5500 -136.5200      42.0        37       146        60
OIR    2025130    131400  -10.5500 -136.5300      42.0        37       147        60
OIR    2025130    131400  -10.5500 -136.5400      42.0        37       146        60
OIR    2025130    131400  -10.5500 -136.5500      42.0        37       147        60
OIR    2025130    131400  -10.5500 -136.5600      42.0        37       147        60
OIR    2025130    131400  -10.5500 -136.5700      42.0        37       147        60
OIR    2025130    131400  -10.5500 -136.5800      42.0        37       146        60
OIR    2025130    131400  -10.5500 -136.6700      42.1        35       147        60
OIR    2025130    131400  -10.5500 -136.6800      42.2        35       146        60
OIR    2025130    131400  -10.5500 -136.6900      42.2        35       145        60
OIR    2025130    131400  -10.5500 -136.7000      42.2        34       146        60
OIR    2025130    131400  -10.5500 -136.7100      42.1        33       146        60
OIR    2025130    131400  -10.5500 -136.7200      42.0        32       144        60
OIR    2025130    131400  -10.5500 -136.7300      41.9        31       141        60
OIR    2025130    131400  -10.5500 -136.7400      41.9        30       136        60
OIR    2025130    131400  -10.5500 -136.7500      41.9        30       130        60
OIR    2025130    131400  -10.5500 -136.7600      41.8        30       124        60
OIR    2025130    131400  -10.5500 -136.7700      41.8        29       123        60
OIR    2025130    131400  -10.5500 -136.7800      41.6        28       123        60
OIR    2025130    131400  -10.5500 -136.7900      40.9        27       122        60
OIR    2025130    131400  -10.5500 -136.8000      40.6        26       120        60
OIR    2025130    131400  -10.5500 -136.8100      40.4        26       124        60
OIR    2025130    131400  -10.5500 -136.8200      40.2        25       127        60
OIR    2025130    131400  -10.5500 -136.8300      40.1        24       130        60
OIR    2025130    131400  -10.5500 -136.8400      40.1        24       133        60
OIR    2025130    131400  -10.5500 -136.8500      40.1        24       136        60
OIR    2025130    131400  -10.5500 -136.8600      40.1        24       137        60
OIR    2025130    131400  -10.5500 -136.8700      40.2        24       134        60
OIR    2025130    131400  -10.5500 -136.8800      40.2        24       133        60
OIR    2025130    131400  -10.5500 -136.8900      40.3        24       131        60
OIR    2025130    131400  -10.5500 -136.9000      40.2        24       131        60
OIR    2025130    131400  -10.5500 -136.9100      40.2        24       131        60
OIR    2025130    131400  -10.5500 -136.9200      40.0        23       132        60
OIR    2025130    131400  -10.5500 -136.9300      39.9        23       132        60
OIR    2025130    131400  -10.5500 -136.9400      39.9        22       129        60
OIR    2025130    131400  -10.5500 -136.9500      39.9        22       127        60
OIR    2025130    131400  -10.5500 -136.9600      39.9        22       128        60
OIR    2025130    131400  -10.5500 -136.9700      39.9        21       128        60
OIR    2025130    131400  -10.5500 -136.9800      39.9        21       126        60
OIR    2025130    131400  -10.5500 -136.9900      39.9        21       126        60
OIR    2025130    131400  -10.5500 -137.0000      39.9        21       128        60
OIR    2025130    131400  -10.5500 -137.0100      39.9        20       131        60
OIR    2025130    131400  -10.5500 -137.0200      39.9        20       136        60
OIR    2025130    131400  -10.5500 -137.0300      39.9        20       137        60
OIR    2025130    131400  -10.5500 -137.0400      39.9        20       138        60
OIR    2025130    131400  -10.5500 -137.0500      39.9        19       139        60
OIR    2025130    131400  -10.5500 -137.0600      39.9        19       140        60
OIR    2025130    131400  -10.5500 -137.0700      39.9        19       139        60
OIR    2025130    131400  -10.5500 -137.0800      40.0        18       139        60
OIR    2025130    131400  -10.5500 -137.0900      40.1        18       140        60
OIR    2025130    131400  -10.5500 -137.1000      40.3        17       138        60
OIR    2025130    131400  -10.5500 -137.1100      40.6        16       130        60
OIR    2025130    131400  -10.5500 -137.1200      40.8        15       127        60
OIR    2025130    131400  -10.5500 -137.1300      40.8        14       126        60
OIR    2025130    131400  -10.5500 -137.1400      40.6        14       121        60
OIR    2025130    131400  -10.5500 -137.1500      40.6        13       116        60
OIR    2025130    131400  -10.5500 -137.1600      40.5        13       116        60
OIR    2025130    131400  -10.5500 -137.1700      40.4        13       121        60
OIR    2025130    131400  -10.5500 -137.1800      40.3        13       124        60
OIR    2025130    131400  -10.5500 -137.1900      40.2        12       125        60
OIR    2025130    131400  -10.5500 -137.2000      40.4        11       122        60
OIR    2025130    131400  -10.5500 -137.2100      40.4        11       119        60
OIR    2025130    131400  -10.5500 -137.2200      40.3        11       115        60
OIR    2025130    131400  -10.5500 -137.2300      40.2        10       116        60
OIR    2025130    131400  -10.5500 -137.2400      40.2        10       119        60
OIR    2025130    131400  -10.5500 -137.2500      40.1         9       121        60
OIR    2025130    131400  -10.5500 -137.2600      40.0         9       122        60
OIR    2025130    131400  -10.5500 -137.2700      39.8         9       121        60
OIR    2025130    131400  -10.5500 -137.2800      39.2         8       120        60
OIR    2025130    131400  -10.5500 -137.2900      38.3         7       121        60
OIR    2025130    131400  -10.5500 -137.3000      37.7         6       122        60
OIR    2025130    131400  -10.5500 -137.3100      37.1         5       123        60
OIR    2025130    131400  -10.5500 -137.3200      37.0         4       122        60
OIR    2025130    131400  -10.5500 -137.3300      37.0         3       115        60
OIR    2025130    131400  -10.5500 -137.3400      37.0         3       112        60
OIR    2025130    131400  -10.5500 -137.3500      37.1         3       113        60
OIR    2025130    131400  -10.5500 -137.3600      37.3         2       114        60
OIR    2025130    131400  -10.5500 -137.3700      37.5         1       115        60
OIR    2025130    131400  -10.5500 -137.3800      37.6         1       112        60
OIR    2025130    131400  -10.5500 -137.3900      37.6         1       109        60
OIR    2025130    131400  -10.5500 -137.4000      37.5         1       112        60
OIR    2025130    131400  -10.5500 -137.4100      37.5         1       112        60
OIR    2025130    131400  -10.5500 -137.4200      37.4         0       111        60
OIR    2025130    131400  -10.5500 -137.4300      37.3         0       109        60
OIR    2025130    131400  -10.5500 -137.4400      37.2         0       107        60
OIR    2025130    131400  -10.5500 -137.4500      37.1         0       108        60
OIR    2025130    131400  -10.5500 -137.4600      37.0         0       109        60
OIR    2025130    131400  -10.5500 -137.4700      36.9         0       113        60
OIR    2025130    131400  -10.5500 -137.4800      36.6         0       117        60
OIR    2025130    131400  -10.5500 -137.4900      36.5         0       121        60
OIR    2025130    131400  -10.5500 -137.5000      36.4         0       123        60
OIR    2025130    131400  -10.5500 -137.5100      36.3         0       120        60
OIR    2025130    131400  -10.5500 -137.5200      35.8         0       116        60
OIR    2025130    131400  -10.5500 -137.5300      35.2         0       116        60
OIR    2025130    131400  -10.5500 -137.5400      34.6         0       116        60
OIR    2025130    131400  -10.5500 -137.5500      34.2         0       116        60
OIR    2025130    131400  -10.5500 -137.5600      33.8         0       116        60
OIR    2025130    131400  -10.5500 -137.5700      33.4         0       116        60
OIR    2025130    131400  -10.5500 -137.5800      33.2         0       116        60
OIR    2025130    131400  -10.5500 -137.5900      33.1         0       115        60
OIR    2025130    131400  -10.5500 -137.6000      33.0         0       111        60
OIR    2025130    131400  -10.5500 -137.6100      33.0         0       109        60
OIR    2025130    131400  -10.5500 -137.6200      33.0         0       110        60
OIR    2025130    131400  -10.5500 -137.6300      33.0         0       112        60
OIR    2025130    131400  -10.5500 -137.6400      33.0         0       112        60
OIR    2025130    131400  -10.5500 -137.6500      33.0         0       113        60
OIR    2025130    131400  -10.5500 -137.6600      33.0         1       115        60
OIR    2025130    131400  -10.5500 -137.6700      32.9         1       116        60
OIR    2025130    131400  -10.5500 -137.6800      32.8         1       116        60
OIR    2025130    131400  -10.5500 -137.6900      32.7         1       120        60
OIR    2025130    131400  -10.5500 -137.7000      32.4         1       125        60
OIR    2025130    131400  -10.5500 -137.7100      31.9         1       125        60
OIR    2025130    131400  -10.5500 -137.7200      31.5         1       124        60
OIR    2025130    131400  -10.5500 -137.7300      30.9         1       125        60
OIR    2025130    131400  -10.5500 -137.7400      30.2         0       125        60
OIR    2025130    131400  -10.5500 -137.7500      29.5       360       122        60
OIR    2025130    131400  -10.5500 -137.7600      28.8       359       121        60
OIR    2025130    131400  -10.5500 -137.7700      28.1       359       123        60
OIR    2025130    131400  -10.5500 -137.7800      27.6       358       124        60
OIR    2025130    131400  -10.5500 -137.7900      27.1       358       124        60
OIR    2025130    131400  -10.5500 -137.8000      26.8       358       125        60
OIR    2025130    131400  -10.5500 -137.8100      26.6       358       127        60
OIR    2025130    131400  -10.5500 -137.8200      26.5       358       128        60
OIR    2025130    131400  -10.5500 -137.8300      26.5       357       129        60
OIR    2025130    131400  -10.5500 -137.8400      26.4       357       130        60
OIR    2025130    131400  -10.5500 -137.8500      26.4       357       132        60
OIR    2025130    131400  -10.5500 -137.8600      26.4       357       131        60
OIR    2025130    131400  -10.5500 -137.8700      26.3       357       130        60
OIR    2025130    131400  -10.5500 -137.8800      26.3       357       130        60
OIR    2025130    131400  -10.5500 -137.8900      26.3       357       129        60
OIR    2025130    131400  -10.5500 -137.9000      26.3       357       127        60
OIR    2025130    131400  -10.5500 -137.9100      26.3       357       125        60
OIR    2025130    131400  -10.5500 -137.9200      26.3       357       122        60
OIR    2025130    131400  -10.5500 -137.9300      26.3       357       121        60
OIR    2025130    131400  -10.5500 -137.9400      26.3       357       121        60
OIR    2025130    131400  -10.5500 -137.9500      26.3       357       122        60
OIR    2025130    131400  -10.5500 -137.9600      26.3       358       123        60
OIR    2025130    131400  -10.5500 -137.9700      26.3       358       124        60
OIR    2025130    131400  -10.5500 -137.9800      26.3       358       126        60
OIR    2025130    131400  -10.5500 -137.9900      26.3       358       128        60
OIR    2025130    131400  -10.5500 -138.0000      26.4       357       128        60
OIR    2025130    131400  -10.5500 -138.0100      26.5       357       127        60
OIR    2025130    131400  -10.5500 -138.0200      26.5       357       125        60
OIR    2025130    131400  -10.5500 -138.0300      26.6       357       124        60
OIR    2025130    131400  -10.5500 -138.0400      26.6       357       124        60
OIR    2025130    131400  -10.5500 -138.0500      26.6       357       124        60
OIR    2025130    131400  -10.5500 -138.0600      26.6       357       125        60
OIR    2025130    131400  -10.5500 -138.0700      26.6       357       126        60
OIR    2025130    131400  -10.5500 -138.0800      26.7       357       129        60
OIR    2025130    131400  -10.5500 -138.0900      26.7       357       132        60
OIR    2025130    131400  -10.5500 -138.1000      26.7       357       134        60
OIR    2025130    131400  -10.5500 -138.1100      26.7       357       135        60
OIR    2025130    131400  -10.5500 -138.1200      26.6       356       137        60
OIR    2025130    131400  -10.5500 -138.1300      26.4       355       139        60
OIR    2025130    131400  -10.5500 -138.1400      26.3       354       141        60
OIR    2025130    131400  -10.5500 -138.1500      26.4       354       142        60
OIR    2025130    131400  -10.5500 -138.1600      26.4       354       142        60
OIR    2025130    131400  -10.5500 -138.1700      26.7       355       140        60
OIR    2025130    131400  -10.5500 -138.1800      27.0       355       137        60
OIR    2025130    131400  -10.5500 -138.1900      27.2       355       136        60
OIR    2025130    131400  -10.5500 -138.2000      27.4       355       135        60
OIR    2025130    131400  -10.5500 -138.2100      27.6       355       132        60
OIR    2025130    131400  -10.5500 -138.2200      27.7       355       130        60
OIR    2025130    131400  -10.5500 -138.2300      27.9       355       132        60
OIR    2025130    131400  -10.5500 -138.2400      28.0       355       136        60
OIR    2025130    131400  -10.5500 -138.2500      28.1       355       142        60
OIR    2025130    131400  -10.5500 -138.2600      28.3       355       146        60
OIR    2025130    131400  -10.5600 -136.3900      42.1        36       149        60
OIR    2025130    131400  -10.5600 -136.4000      42.2        36       148        60
OIR    2025130    131400  -10.5600 -136.4100      42.2        36       148        60
OIR    2025130    131400  -10.5600 -136.4200      42.2        36       147        60
OIR    2025130    131400  -10.5600 -136.4300      42.2        36       143        60
OIR    2025130    131400  -10.5600 -136.4400      42.2        36       144        60
OIR    2025130    131400  -10.5600 -136.4500      42.2        36       147        60
OIR    2025130    131400  -10.5600 -136.4600      42.2        36       148        60
OIR    2025130    131400  -10.5600 -136.4700      42.2        36       148        60
OIR    2025130    131400  -10.5600 -136.4800      42.2        36       143        60
OIR    2025130    131400  -10.5600 -136.4900      42.2        36       140        60
OIR    2025130    131400  -10.5600 -136.5000      42.1        36       143        60
OIR    2025130    131400  -10.5600 -136.5100      42.1        36       145        60
OIR    2025130    131400  -10.5600 -136.5200      42.1        36       146        60
OIR    2025130    131400  -10.5600 -136.5300      42.0        36       147        60
OIR    2025130    131400  -10.5600 -136.5400      42.0        36       147        60
OIR    2025130    131400  -10.5600 -136.5500      42.0        36       148        60
OIR    2025130    131400  -10.5600 -136.5600      42.0        36       148        60
OIR    2025130    131400  -10.5600 -136.5700      42.0        36       148        60
OIR    2025130    131400  -10.5600 -136.5800      42.0        36       147        60
OIR    2025130    131400  -10.5600 -136.6700      42.1        35       146        60
OIR    2025130    131400  -10.5600 -136.6800      42.1        35       144        60
OIR    2025130    131400  -10.5600 -136.6900      42.0        34       143        60
OIR    2025130    131400  -10.5600 -136.7000      42.0        34       144        60
OIR    2025130    131400  -10.5600 -136.7100      41.9        32       145        60
OIR    2025130    131400  -10.5600 -136.7200      41.9        31       144        60
OIR    2025130    131400  -10.5600 -136.7300      41.9        31       142        60
OIR    2025130    131400  -10.5600 -136.7400      41.9        30       138        60
OIR    2025130    131400  -10.5600 -136.7500      41.9        30       133        60
OIR    2025130    131400  -10.5600 -136.7600      41.6        29       128        60
OIR    2025130    131400  -10.5600 -136.7700      41.5        28       125        60
OIR    2025130    131400  -10.5600 -136.7800      41.3        27       124        60
OIR    2025130    131400  -10.5600 -136.7900      40.9        26       123        60
OIR    2025130    131400  -10.5600 -136.8000      40.5        26       123        60
OIR    2025130    131400  -10.5600 -136.8100      40.3        25       125        60
OIR    2025130    131400  -10.5600 -136.8200      40.2        24       127        60
OIR    2025130    131400  -10.5600 -136.8300      40.1        24       129        60
OIR    2025130    131400  -10.5600 -136.8400      40.1        24       132        60
OIR    2025130    131400  -10.5600 -136.8500      40.1        24       134        60
OIR    2025130    131400  -10.5600 -136.8600      40.2        24       135        60
OIR    2025130    131400  -10.5600 -136.8700      40.3        24       136        60
OIR    2025130    131400  -10.5600 -136.8800      40.3        24       137        60
OIR    2025130    131400  -10.5600 -136.8900      40.3        24       136        60
OIR    2025130    131400  -10.5600 -136.9000      40.2        24       134        60
OIR    2025130    131400  -10.5600 -136.9100      40.2        23       130        60
OIR    2025130    131400  -10.5600 -136.9200      40.1        23       131        60
OIR    2025130    131400  -10.5600 -136.9300      40.0        22       132        60
OIR    2025130    131400  -10.5600 -136.9400      40.0        22       131        60
OIR    2025130    131400  -10.5600 -136.9500      40.0        21       131        60
OIR    2025130    131400  -10.5600 -136.9600      40.0        21       132        60
OIR    2025130    131400  -10.5600 -136.9700      40.0        21       131        60
OIR    2025130    131400  -10.5600 -136.9800      40.0        21       129        60
OIR    2025130    131400  -10.5600 -136.9900      40.0        21       129        60
OIR    2025130    131400  -10.5600 -137.0000      40.0        21       130        60
OIR    2025130    131400  -10.5600 -137.0100      40.0        20       133        60
OIR    2025130    131400  -10.5600 -137.0200      39.9        20       136        60
OIR    2025130    131400  -10.5600 -137.0300      39.9        20       137        60
OIR    2025130    131400  -10.5600 -137.0400      40.0        19       138        60
OIR    2025130    131400  -10.5600 -137.0500      40.0        19       137        60
OIR    2025130    131400  -10.5600 -137.0600      40.0        19       137        60
OIR    2025130    131400  -10.5600 -137.0700      40.1        18       136        60
OIR    2025130    131400  -10.5600 -137.0800      40.2        18       135        60
OIR    2025130    131400  -10.5600 -137.0900      40.2        18       134        60
OIR    2025130    131400  -10.5600 -137.1000      40.4        17       132        60
OIR    2025130    131400  -10.5600 -137.1100      40.9        16       125        60
OIR    2025130    131400  -10.5600 -137.1200      41.0        15       122        60
OIR    2025130    131400  -10.5600 -137.1300      41.0        14       120        60
OIR    2025130    131400  -10.5600 -137.1400      41.0        14       115        60
OIR    2025130    131400  -10.5600 -137.1500      40.7        13       110        60
OIR    2025130    131400  -10.5600 -137.1600      40.7        13       114        60
OIR    2025130    131400  -10.5600 -137.1700      40.6        13       120        60
OIR    2025130    131400  -10.5600 -137.1800      40.7        13       127        60
OIR    2025130    131400  -10.5600 -137.1900      40.6        11       128        60
OIR    2025130    131400  -10.5600 -137.2000      40.5        11       123        60
OIR    2025130    131400  -10.5600 -137.2100      40.5        11       117        60
OIR    2025130    131400  -10.5600 -137.2200      40.4        11       113        60
OIR    2025130    131400  -10.5600 -137.2300      40.3        10       116        60
OIR    2025130    131400  -10.5600 -137.2400      40.3        10       122        60
OIR    2025130    131400  -10.5600 -137.2500      40.3         9       123        60
OIR    2025130    131400  -10.5600 -137.2600      40.2         9       125        60
OIR    2025130    131400  -10.5600 -137.2700      40.2         9       125        60
OIR    2025130    131400  -10.5600 -137.2800      39.9         9       124        60
OIR    2025130    131400  -10.5600 -137.2900      39.2         8       125        60
OIR    2025130    131400  -10.5600 -137.3000      38.3         6       124        60
OIR    2025130    131400  -10.5600 -137.3100      37.4         5       123        60
OIR    2025130    131400  -10.5600 -137.3200      37.1         4       120        60
OIR    2025130    131400  -10.5600 -137.3300      37.0         3       114        60
OIR    2025130    131400  -10.5600 -137.3400      37.0         3       112        60
OIR    2025130    131400  -10.5600 -137.3500      37.1         3       112        60
OIR    2025130    131400  -10.5600 -137.3600      37.3         2       114        60
OIR    2025130    131400  -10.5600 -137.3700      37.7         1       115        60
OIR    2025130    131400  -10.5600 -137.3800      37.7         1       113        60
OIR    2025130    131400  -10.5600 -137.3900      37.6         1       111        60
OIR    2025130    131400  -10.5600 -137.4000      37.6         0       113        60
OIR    2025130    131400  -10.5600 -137.4100      37.5         0       113        60
OIR    2025130    131400  -10.5600 -137.4200      37.4         0       110        60
OIR    2025130    131400  -10.5600 -137.4300      37.4         0       108        60
OIR    2025130    131400  -10.5600 -137.4400      37.3         0       105        60
OIR    2025130    131400  -10.5600 -137.4500      37.2         0       105        60
OIR    2025130    131400  -10.5600 -137.4600      37.1         0       105        60
OIR    2025130    131400  -10.5600 -137.4700      37.0         0       111        60
OIR    2025130    131400  -10.5600 -137.4800      36.8         0       115        60
OIR    2025130    131400  -10.5600 -137.4900      36.6         0       117        60
OIR    2025130    131400  -10.5600 -137.5000      36.5         0       120        60
OIR    2025130    131400  -10.5600 -137.5100      36.4       360       117        60
OIR    2025130    131400  -10.5600 -137.5200      36.1       360       116        60
OIR    2025130    131400  -10.5600 -137.5300      35.7       360       116        60
OIR    2025130    131400  -10.5600 -137.5400      35.2       360       115        60
OIR    2025130    131400  -10.5600 -137.5500      34.6       360       113        60
OIR    2025130    131400  -10.5600 -137.5600      34.1       360       113        60
OIR    2025130    131400  -10.5600 -137.5700      33.6       360       114        60
OIR    2025130    131400  -10.5600 -137.5800      33.3         0       113        60
OIR    2025130    131400  -10.5600 -137.5900      33.2         0       110        60
OIR    2025130    131400  -10.5600 -137.6000      33.1         0       108        60
OIR    2025130    131400  -10.5600 -137.6100      33.1         0       108        60
OIR    2025130    131400  -10.5600 -137.6200      33.0         0       111        60
OIR    2025130    131400  -10.5600 -137.6300      33.0         0       114        60
OIR    2025130    131400  -10.5600 -137.6400      33.0         0       115        60
OIR    2025130    131400  -10.5600 -137.6500      33.0         0       116        60
OIR    2025130    131400  -10.5600 -137.6600      33.0         0       117        60
OIR    2025130    131400  -10.5600 -137.6700      33.0         0       119        60
OIR    2025130    131400  -10.5600 -137.6800      33.0         0       120        60
OIR    2025130    131400  -10.5600 -137.6900      32.9         1       122        60
OIR    2025130    131400  -10.5600 -137.7000      32.6         1       126        60
OIR    2025130    131400  -10.5600 -137.7100      32.2         1       126        60
OIR    2025130    131400  -10.5600 -137.7200      31.8         1       125        60
OIR    2025130    131400  -10.5600 -137.7300      31.4         1       125        60
OIR    2025130    131400  -10.5600 -137.7400      30.8         0       124        60
OIR    2025130    131400  -10.5600 -137.7500      30.0       360       122        60
OIR    2025130    131400  -10.5600 -137.7600      29.1       359       121        60
OIR    2025130    131400  -10.5600 -137.7700      28.4       359       123        60
OIR    2025130    131400  -10.5600 -137.7800      27.8       358       124        60
OIR    2025130    131400  -10.5600 -137.7900      27.3       358       125        60
OIR    2025130    131400  -10.5600 -137.8000      27.0       358       126        60
OIR    2025130    131400  -10.5600 -137.8100      26.7       358       126        60
OIR    2025130    131400  -10.5600 -137.8200      26.6       358       127        60
OIR    2025130    131400  -10.5600 -137.8300      26.5       357       128        60
OIR    2025130    131400  -10.5600 -137.8400      26.5       357       130        60
OIR    2025130    131400  -10.5600 -137.8500      26.5       357       133        60
OIR    2025130    131400  -10.5600 -137.8600      26.4       357       130        60
OIR    2025130    131400  -10.5600 -137.8700      26.4       357       129        60
OIR    2025130    131400  -10.5600 -137.8800      26.4       357       129        60
OIR    2025130    131400  -10.5600 -137.8900      26.4       357       128        60
OIR    2025130    131400  -10.5600 -137.9000      26.3       357       127        60
OIR    2025130    131400  -10.5600 -137.9100      26.4       357       125        60
OIR    2025130    131400  -10.5600 -137.9200      26.4       357       122        60
OIR    2025130    131400  -10.5600 -137.9300      26.4       357       121        60
OIR    2025130    131400  -10.5600 -137.9400      26.4       357       121        60
OIR    2025130    131400  -10.5600 -137.9500      26.3       357       123        60
OIR    2025130    131400  -10.5600 -137.9600      26.3       357       125        60
OIR    2025130    131400  -10.5600 -137.9700      26.3       357       126        60
OIR    2025130    131400  -10.5600 -137.9800      26.4       358       128        60
OIR    2025130    131400  -10.5600 -137.9900      26.4       357       130        60
OIR    2025130    131400  -10.5600 -138.0000      26.5       357       129        60
OIR    2025130    131400  -10.5600 -138.0100      26.5       357       127        60
OIR    2025130    131400  -10.5600 -138.0200      26.6       357       125        60
OIR    2025130    131400  -10.5600 -138.0300      26.6       357       124        60
OIR    2025130    131400  -10.5600 -138.0400      26.6       357       124        60
OIR    2025130    131400  -10.5600 -138.0500      26.6       357       124        60
OIR    2025130    131400  -10.5600 -138.0600      26.6       357       124        60
OIR    2025130    131400  -10.5600 -138.0700      26.7       357       125        60
OIR    2025130    131400  -10.5600 -138.0800      26.7       357       128        60
OIR    2025130    131400  -10.5600 -138.0900      26.7       357       130        60
OIR    2025130    131400  -10.5600 -138.1000      26.7       357       131        60
OIR    2025130    131400  -10.5600 -138.1100      26.7       357       133        60
OIR    2025130    131400  -10.5600 -138.1200      26.7       357       135        60
OIR    2025130    131400  -10.5600 -138.1300      26.8       357       139        60
OIR    2025130    131400  -10.5600 -138.1400      26.9       357       143        60
OIR    2025130    131400  -10.5600 -138.1500      26.9       356       145        60
OIR    2025130    131400  -10.5600 -138.1600      26.7       356       146        60
OIR    2025130    131400  -10.5600 -138.1700      26.8       356       145        60
OIR    2025130    131400  -10.5600 -138.1800      27.1       356       142        60
OIR    2025130    131400  -10.5600 -138.1900      27.1       356       141        60
OIR    2025130    131400  -10.5600 -138.2000      27.3       356       139        60
OIR    2025130    131400  -10.5600 -138.2100      27.4       356       135        60
OIR    2025130    131400  -10.5600 -138.2200      27.5       356       132        60
OIR    2025130    131400  -10.5600 -138.2300      27.6       356       131        60
OIR    2025130    131400  -10.5600 -138.2400      27.7       356       136        60
OIR    2025130    131400  -10.5600 -138.2500      27.8       356       145        60
OIR    2025130    131400  -10.5600 -138.2600      28.0       355       148        60
OIR    2025130    131400  -10.5600 -138.3400      28.5       354       149        60
OIR    2025130    131400  -10.5700 -136.3900      42.1        36       147        60
OIR    2025130    131400  -10.5700 -136.4000      42.2        36       146        60
OIR    2025130    131400  -10.5700 -136.4100      42.2        36       147        60
OIR    2025130    131400  -10.5700 -136.4200      42.2        36       146        60
OIR    2025130    131400  -10.5700 -136.4300      42.3        36       144        60
OIR    2025130    131400  -10.5700 -136.4400      42.3        36       145        60
OIR    2025130    131400  -10.5700 -136.4500      42.3        36       148        60
OIR    2025130    131400  -10.5700 -136.4600      42.3        36       149        60
OIR    2025130    131400  -10.5700 -136.4800      42.2        36       145        60
OIR    2025130    131400  -10.5700 -136.4900      42.2        36       142        60
OIR    2025130    131400  -10.5700 -136.5000      42.1        36       145        60
OIR    2025130    131400  -10.5700 -136.5100      42.1        36       146        60
OIR    2025130    131400  -10.5700 -136.5200      42.1        36       147        60
OIR    2025130    131400  -10.5700 -136.5300      42.1        36       148        60
OIR    2025130    131400  -10.5700 -136.5400      42.0        36       148        60
OIR    2025130    131400  -10.5700 -136.5500      42.0        36       149        60
OIR    2025130    131400  -10.5700 -136.5600      42.0        36       149        60
OIR    2025130    131400  -10.5700 -136.6700      42.0        35       145        60
OIR    2025130    131400  -10.5700 -136.6800      41.9        34       145        60
OIR    2025130    131400  -10.5700 -136.6900      41.7        33       145        60
OIR    2025130    131400  -10.5700 -136.7000      41.6        32       144        60
OIR    2025130    131400  -10.5700 -136.7100      41.6        31       143        60
OIR    2025130    131400  -10.5700 -136.7200      41.7        31       143        60
OIR    2025130    131400  -10.5700 -136.7300      41.8        30       142        60
OIR    2025130    131400  -10.5700 -136.7400      41.9        30       139        60
OIR    2025130    131400  -10.5700 -136.7500      41.9        29       136        60
OIR    2025130    131400  -10.5700 -136.7600      41.7        28       133        60
OIR    2025130    131400  -10.5700 -136.7700      41.3        27       130        60
OIR    2025130    131400  -10.5700 -136.7800      41.1        27       128        60
OIR    2025130    131400  -10.5700 -136.7900      40.9        26       126        60
OIR    2025130    131400  -10.5700 -136.8000      40.5        25       124        60
OIR    2025130    131400  -10.5700 -136.8100      40.3        24       125        60
OIR    2025130    131400  -10.5700 -136.8200      40.2        24       126        60
OIR    2025130    131400  -10.5700 -136.8300      40.2        24       128        60
OIR    2025130    131400  -10.5700 -136.8400      40.2        24       130        60
OIR    2025130    131400  -10.5700 -136.8500      40.2        24       130        60
OIR    2025130    131400  -10.5700 -136.8600      40.2        24       132        60
OIR    2025130    131400  -10.5700 -136.8700      40.3        24       135        60
OIR    2025130    131400  -10.5700 -136.8800      40.3        24       134        60
OIR    2025130    131400  -10.5700 -136.8900      40.3        24       133        60
OIR    2025130    131400  -10.5700 -136.9000      40.2        24       133        60
OIR    2025130    131400  -10.5700 -136.9100      40.2        23       133        60
OIR    2025130    131400  -10.5700 -136.9200      40.1        23       134        60
OIR    2025130    131400  -10.5700 -136.9300      40.1        22       134        60
OIR    2025130    131400  -10.5700 -136.9400      40.1        21       133        60
OIR    2025130    131400  -10.5700 -136.9500      40.1        21       133        60
OIR    2025130    131400  -10.5700 -136.9600      40.1        21       133        60
OIR    2025130    131400  -10.5700 -136.9700      40.0        21       132        60
OIR    2025130    131400  -10.5700 -136.9800      40.0        21       130        60
OIR    2025130    131400  -10.5700 -136.9900      40.0        21       131        60
OIR    2025130    131400  -10.5700 -137.0000      40.0        20       132        60
OIR    2025130    131400  -10.5700 -137.0100      40.0        20       134        60
OIR    2025130    131400  -10.5700 -137.0200      40.0        20       136        60
OIR    2025130    131400  -10.5700 -137.0300      40.0        19       137        60
OIR    2025130    131400  -10.5700 -137.0400      40.0        19       137        60
OIR    2025130    131400  -10.5700 -137.0500      40.1        19       136        60
OIR    2025130    131400  -10.5700 -137.0600      40.2        18       134        60
OIR    2025130    131400  -10.5700 -137.0700      40.2        18       133        60
OIR    2025130    131400  -10.5700 -137.0800      40.3        18       132        60
OIR    2025130    131400  -10.5700 -137.0900      40.3        18       131        60
OIR    2025130    131400  -10.5700 -137.1000      40.4        18       129        60
OIR    2025130    131400  -10.5700 -137.1100      40.7        17       126        60
OIR    2025130    131400  -10.5700 -137.1200      41.0        16       125        60
OIR    2025130    131400  -10.5700 -137.1300      41.1        14       123        60
OIR    2025130    131400  -10.5700 -137.1400      41.0        14       117        60
OIR    2025130    131400  -10.5700 -137.1500      40.8        13       113        60
OIR    2025130    131400  -10.5700 -137.1600      40.8        13       114        60
OIR    2025130    131400  -10.5700 -137.1700      40.8        13       117        60
OIR    2025130    131400  -10.5700 -137.1800      40.7        12       123        60
OIR    2025130    131400  -10.5700 -137.1900      40.6        11       124        60
OIR    2025130    131400  -10.5700 -137.2000      40.6        11       120        60
OIR    2025130    131400  -10.5700 -137.2100      40.5        11       116        60
OIR    2025130    131400  -10.5700 -137.2200      40.5        10       112        60
OIR    2025130    131400  -10.5700 -137.2300      40.4        10       115        60
OIR    2025130    131400  -10.5700 -137.2400      40.4        10       121        60
OIR    2025130    131400  -10.5700 -137.2500      40.4         9       124        60
OIR    2025130    131400  -10.5700 -137.2600      40.4         9       127        60
OIR    2025130    131400  -10.5700 -137.2700      40.4         9       126        60
OIR    2025130    131400  -10.5700 -137.2800      40.3         9       124        60
OIR    2025130    131400  -10.5700 -137.2900      40.0         8       123        60
OIR    2025130    131400  -10.5700 -137.3000      39.1         7       122        60
OIR    2025130    131400  -10.5700 -137.3100      37.5         5       121        60
OIR    2025130    131400  -10.5700 -137.3200      37.1         4       119        60
OIR    2025130    131400  -10.5700 -137.3300      36.9         3       115        60
OIR    2025130    131400  -10.5700 -137.3400      36.9         3       115        60
OIR    2025130    131400  -10.5700 -137.3500      37.0         3       116        60
OIR    2025130    131400  -10.5700 -137.3600      37.2         2       116        60
OIR    2025130    131400  -10.5700 -137.3700      37.6         1       115        60
OIR    2025130    131400  -10.5700 -137.3800      37.7         1       116        60
OIR    2025130    131400  -10.5700 -137.3900      37.6         0       116        60
OIR    2025130    131400  -10.5700 -137.4000      37.6         0       119        60
OIR    2025130    131400  -10.5700 -137.4100      37.5         0       117        60
OIR    2025130    131400  -10.5700 -137.4200      37.5         0       113        60
OIR    2025130    131400  -10.5700 -137.4300      37.4         0       110        60
OIR    2025130    131400  -10.5700 -137.4400      37.3         0       107        60
OIR    2025130    131400  -10.5700 -137.4500      37.2         0       105        60
OIR    2025130    131400  -10.5700 -137.4600      37.1         0       107        60
OIR    2025130    131400  -10.5700 -137.4700      37.0         0       110        60
OIR    2025130    131400  -10.5700 -137.4800      36.9       360       113        60
OIR    2025130    131400  -10.5700 -137.4900      36.7       360       116        60
OIR    2025130    131400  -10.5700 -137.5000      36.5       360       116        60
OIR    2025130    131400  -10.5700 -137.5100      36.4       360       115        60
OIR    2025130    131400  -10.5700 -137.5200      36.3       360       114        60
OIR    2025130    131400  -10.5700 -137.5300      35.9       360       114        60
OIR    2025130    131400  -10.5700 -137.5400      35.4       360       114        60
OIR    2025130    131400  -10.5700 -137.5500      34.8       360       112        60
OIR    2025130    131400  -10.5700 -137.5600      34.2       360       112        60
OIR    2025130    131400  -10.5700 -137.5700      33.8       360       113        60
OIR    2025130    131400  -10.5700 -137.5800      33.4       360       112        60
OIR    2025130    131400  -10.5700 -137.5900      33.2       360       109        60
OIR    2025130    131400  -10.5700 -137.6000      33.2       360       108        60
OIR    2025130    131400  -10.5700 -137.6100      33.1       360       108        60
OIR    2025130    131400  -10.5700 -137.6200      33.1         0       112        60
OIR    2025130    131400  -10.5700 -137.6300      33.1         0       115        60
OIR    2025130    131400  -10.5700 -137.6400      33.0         0       116        60
OIR    2025130    131400  -10.5700 -137.6500      33.1         0       119        60
OIR    2025130    131400  -10.5700 -137.6600      33.1         0       121        60
OIR    2025130    131400  -10.5700 -137.6700      33.1         0       122        60
OIR    2025130    131400  -10.5700 -137.6800      33.1         0       122        60
OIR    2025130    131400  -10.5700 -137.6900      33.0         0       123        60
OIR    2025130    131400  -10.5700 -137.7000      32.8         0       125        60
OIR    2025130    131400  -10.5700 -137.7100      32.6         0       127        60
OIR    2025130    131400  -10.5700 -137.7200      32.2         0       128        60
OIR    2025130    131400  -10.5700 -137.7300      31.7         0       127        60
OIR    2025130    131400  -10.5700 -137.7400      31.2       360       125        60
OIR    2025130    131400  -10.5700 -137.7500      30.6       360       123        60
OIR    2025130    131400  -10.5700 -137.7600      29.6       359       123        60
OIR    2025130    131400  -10.5700 -137.7700      28.7       359       124        60
OIR    2025130    131400  -10.5700 -137.7800      28.1       358       125        60
OIR    2025130    131400  -10.5700 -137.7900      27.6       358       126        60
OIR    2025130    131400  -10.5700 -137.8000      27.2       358       126        60
OIR    2025130    131400  -10.5700 -137.8100      26.9       358       126        60
OIR    2025130    131400  -10.5700 -137.8200      26.7       357       126        60
OIR    2025130    131400  -10.5700 -137.8300      26.6       357       127        60
OIR    2025130    131400  -10.5700 -137.8400      26.6       357       128        60
OIR    2025130    131400  -10.5700 -137.8500      26.5       357       129        60
OIR    2025130    131400  -10.5700 -137.8600      26.4       357       128        60
OIR    2025130    131400  -10.5700 -137.8700      26.4       357       127        60
OIR    2025130    131400  -10.5700 -137.8800      26.4       357       127        60
OIR    2025130    131400  -10.5700 -137.8900      26.4       357       127        60
OIR    2025130    131400  -10.5700 -137.9000      26.4       357       127        60
OIR    2025130    131400  -10.5700 -137.9100      26.4       357       125        60
OIR    2025130    131400  -10.5700 -137.9200      26.4       357       122        60
OIR    2025130    131400  -10.5700 -137.9300      26.4       357       121        60
OIR    2025130    131400  -10.5700 -137.9400      26.4       357       121        60
OIR    2025130    131400  -10.5700 -137.9500      26.4       357       123        60
OIR    2025130    131400  -10.5700 -137.9600      26.4       357       125        60
OIR    2025130    131400  -10.5700 -137.9700      26.4       357       125        60
OIR    2025130    131400  -10.5700 -137.9800      26.4       357       126        60
OIR    2025130    131400  -10.5700 -137.9900      26.5       357       129        60
OIR    2025130    131400  -10.5700 -138.0000      26.5       357       128        60
OIR    2025130    131400  -10.5700 -138.0100      26.5       357       127        60
OIR    2025130    131400  -10.5700 -138.0200      26.6       357       126        60
OIR    2025130    131400  -10.5700 -138.0300      26.6       357       125        60
OIR    2025130    131400  -10.5700 -138.0400      26.6       357       124        60
OIR    2025130    131400  -10.5700 -138.0500      26.6       357       124        60
OIR    2025130    131400  -10.5700 -138.0600      26.7       357       125        60
OIR    2025130    131400  -10.5700 -138.0700      26.7       357       126        60
OIR    2025130    131400  -10.5700 -138.0800      26.7       357       128        60
OIR    2025130    131400  -10.5700 -138.0900      26.7       357       130        60
OIR    2025130    131400  -10.5700 -138.1000      26.7       357       131        60
OIR    2025130    131400  -10.5700 -138.1100      26.8       357       133        60
OIR    2025130    131400  -10.5700 -138.1200      26.8       357       134        60
OIR    2025130    131400  -10.5700 -138.1300      26.9       357       137        60
OIR    2025130    131400  -10.5700 -138.1400      27.0       358       141        60
OIR    2025130    131400  -10.5700 -138.1500      27.0       358       145        60
OIR    2025130    131400  -10.5700 -138.1600      27.1       358       148        60
OIR    2025130    131400  -10.5700 -138.1700      27.0       358       146        60
OIR    2025130    131400  -10.5700 -138.1800      27.1       358       144        60
OIR    2025130    131400  -10.5700 -138.1900      27.2       357       145        60
OIR    2025130    131400  -10.5700 -138.2000      27.2       357       144        60
OIR    2025130    131400  -10.5700 -138.2100      27.3       357       141        60
OIR    2025130    131400  -10.5700 -138.2200      27.3       357       138        60
OIR    2025130    131400  -10.5700 -138.2300      27.3       356       134        60
OIR    2025130    131400  -10.5700 -138.2400      27.3       356       136        60
OIR    2025130    131400  -10.5700 -138.2500      27.5       356       143        60
OIR    2025130    131400  -10.5700 -138.2600      27.6       356       147        60
OIR    2025130    131400  -10.5700 -138.3300      28.4       355       149        60
OIR    2025130    131400  -10.5700 -138.3400      28.4       355       149        60
OIR    2025130    131400  -10.5800 -136.3900      42.2        36       146        60
OIR    2025130    131400  -10.5800 -136.4000      42.2        36       145        60
OIR    2025130    131400  -10.5800 -136.4100      42.2        36       146        60
OIR    2025130    131400  -10.5800 -136.4200      42.3        36       146        60
OIR    2025130    131400  -10.5800 -136.4300      42.3        36       144        60
OIR    2025130    131400  -10.5800 -136.4400      42.3        36       146        60
OIR    2025130    131400  -10.5800 -136.4500      42.3        36       148        60
OIR    2025130    131400  -10.5800 -136.4600      42.3        36       149        60
OIR    2025130    131400  -10.5800 -136.4800      42.2        36       148        60
OIR    2025130    131400  -10.5800 -136.4900      42.2        36       147        60
OIR    2025130    131400  -10.5800 -136.5000      42.1        36       148        60
OIR    2025130    131400  -10.5800 -136.5100      42.1        36       149        60
OIR    2025130    131400  -10.5800 -136.5200      42.1        36       148        60
OIR    2025130    131400  -10.5800 -136.5300      42.1        36       149        60
OIR    2025130    131400  -10.5800 -136.6600      41.8        34       149        60
OIR    2025130    131400  -10.5800 -136.6700      41.7        34       146        60
OIR    2025130    131400  -10.5800 -136.6800      41.4        33       147        60
OIR    2025130    131400  -10.5800 -136.6900      41.2        32       148        60
OIR    2025130    131400  -10.5800 -136.7000      41.2        31       144        60
OIR    2025130    131400  -10.5800 -136.7100      41.2        31       141        60
OIR    2025130    131400  -10.5800 -136.7200      41.4        30       141        60
OIR    2025130    131400  -10.5800 -136.7300      41.5        30       141        60
OIR    2025130    131400  -10.5800 -136.7400      41.7        29       140        60
OIR    2025130    131400  -10.5800 -136.7500      41.8        28       139        60
OIR    2025130    131400  -10.5800 -136.7600      41.7        27       138        60
OIR    2025130    131400  -10.5800 -136.7700      41.5        26       136        60
OIR    2025130    131400  -10.5800 -136.7800      41.2        25       133        60
OIR    2025130    131400  -10.5800 -136.7900      40.8        25       129        60
OIR    2025130    131400  -10.5800 -136.8000      40.5        25       125        60
OIR    2025130    131400  -10.5800 -136.8100      40.3        24       125        60
OIR    2025130    131400  -10.5800 -136.8200      40.2        24       125        60
OIR    2025130    131400  -10.5800 -136.8300      40.2        24       127        60
OIR    2025130    131400  -10.5800 -136.8400      40.2        24       127        60
OIR    2025130    131400  -10.5800 -136.8500      40.2        24       127        60
OIR    2025130    131400  -10.5800 -136.8600      40.3        24       129        60
OIR    2025130    131400  -10.5800 -136.8700      40.3        24       133        60
OIR    2025130    131400  -10.5800 -136.8800      40.3        24       132        60
OIR    2025130    131400  -10.5800 -136.8900      40.3        24       128        60
OIR    2025130    131400  -10.5800 -136.9000      40.3        23       130        60
OIR    2025130    131400  -10.5800 -136.9100      40.3        23       136        60
OIR    2025130    131400  -10.5800 -136.9200      40.3        22       137        60
OIR    2025130    131400  -10.5800 -136.9300      40.2        21       136        60
OIR    2025130    131400  -10.5800 -136.9400      40.1        21       135        60
OIR    2025130    131400  -10.5800 -136.9500      40.1        21       134        60
OIR    2025130    131400  -10.5800 -136.9600      40.1        21       133        60
OIR    2025130    131400  -10.5800 -136.9700      40.1        21       132        60
OIR    2025130    131400  -10.5800 -136.9800      40.1        21       131        60
OIR    2025130    131400  -10.5800 -136.9900      40.1        20       133        60
OIR    2025130    131400  -10.5800 -137.0000      40.1        20       135        60
OIR    2025130    131400  -10.5800 -137.0100      40.1        20       136        60
OIR    2025130    131400  -10.5800 -137.0200      40.1        19       135        60
OIR    2025130    131400  -10.5800 -137.0300      40.1        19       136        60
OIR    2025130    131400  -10.5800 -137.0400      40.2        19       136        60
OIR    2025130    131400  -10.5800 -137.0500      40.2        18       133        60
OIR    2025130    131400  -10.5800 -137.0600      40.3        18       131        60
OIR    2025130    131400  -10.5800 -137.0700      40.3        18       130        60
OIR    2025130    131400  -10.5800 -137.0800      40.3        18       129        60
OIR    2025130    131400  -10.5800 -137.0900      40.4        18       127        60
OIR    2025130    131400  -10.5800 -137.1000      40.4        18       126        60
OIR    2025130    131400  -10.5800 -137.1100      40.5        18       128        60
OIR    2025130    131400  -10.5800 -137.1200      40.6        17       128        60
OIR    2025130    131400  -10.5800 -137.1300      41.0        15       127        60
OIR    2025130    131400  -10.5800 -137.1400      40.9        14       122        60
OIR    2025130    131400  -10.5800 -137.1500      40.7        13       116        60
OIR    2025130    131400  -10.5800 -137.1600      40.8        13       115        60
OIR    2025130    131400  -10.5800 -137.1700      40.9        12       115        60
OIR    2025130    131400  -10.5800 -137.1800      40.8        11       119        60
OIR    2025130    131400  -10.5800 -137.1900      40.7        11       119        60
OIR    2025130    131400  -10.5800 -137.2000      40.7        11       116        60
OIR    2025130    131400  -10.5800 -137.2100      40.6        11       115        60
OIR    2025130    131400  -10.5800 -137.2200      40.6        10       112        60
OIR    2025130    131400  -10.5800 -137.2300      40.5        10       114        60
OIR    2025130    131400  -10.5800 -137.2400      40.5        10       120        60
OIR    2025130    131400  -10.5800 -137.2500      40.4         9       125        60
OIR    2025130    131400  -10.5800 -137.2600      40.4         9       129        60
OIR    2025130    131400  -10.5800 -137.2700      40.4         9       127        60
OIR    2025130    131400  -10.5800 -137.2800      40.4         9       123        60
OIR    2025130    131400  -10.5800 -137.2900      40.3         9       121        60
OIR    2025130    131400  -10.5800 -137.3000      39.9         8       120        60
OIR    2025130    131400  -10.5800 -137.3100      37.8         6       119        60
OIR    2025130    131400  -10.5800 -137.3200      36.9         4       117        60
OIR    2025130    131400  -10.5800 -137.3300      36.8         3       116        60
OIR    2025130    131400  -10.5800 -137.3400      36.8         3       117        60
OIR    2025130    131400  -10.5800 -137.3500      36.9         3       121        60
OIR    2025130    131400  -10.5800 -137.3600      37.1         2       117        60
OIR    2025130    131400  -10.5800 -137.3700      37.5         1       116        60
OIR    2025130    131400  -10.5800 -137.3800      37.6         0       117        60
OIR    2025130    131400  -10.5800 -137.3900      37.6         0       122        60
OIR    2025130    131400  -10.5800 -137.4000      37.6         0       125        60
OIR    2025130    131400  -10.5800 -137.4100      37.6         0       123        60
OIR    2025130    131400  -10.5800 -137.4200      37.5         0       116        60
OIR    2025130    131400  -10.5800 -137.4300      37.4         0       112        60
OIR    2025130    131400  -10.5800 -137.4400      37.3         0       109        60
OIR    2025130    131400  -10.5800 -137.4500      37.2         0       107        60
OIR    2025130    131400  -10.5800 -137.4600      37.1       360       107        60
OIR    2025130    131400  -10.5800 -137.4700      37.0       360       109        60
OIR    2025130    131400  -10.5800 -137.4800      36.9       360       112        60
OIR    2025130    131400  -10.5800 -137.4900      36.8       360       114        60
OIR    2025130    131400  -10.5800 -137.5000      36.6       360       115        60
OIR    2025130    131400  -10.5800 -137.5100      36.5       359       113        60
OIR    2025130    131400  -10.5800 -137.5200      36.3       359       112        60
OIR    2025130    131400  -10.5800 -137.5300      36.1       359       113        60
OIR    2025130    131400  -10.5800 -137.5400      35.7       359       113        60
OIR    2025130    131400  -10.5800 -137.5500      35.0       359       112        60
OIR    2025130    131400  -10.5800 -137.5600      34.4       359       112        60
OIR    2025130    131400  -10.5800 -137.5700      34.0       359       112        60
OIR    2025130    131400  -10.5800 -137.5800      33.6       359       111        60
OIR    2025130    131400  -10.5800 -137.5900      33.4       360       109        60
OIR    2025130    131400  -10.5800 -137.6000      33.2       360       109        60
OIR    2025130    131400  -10.5800 -137.6100      33.2       360       109        60
OIR    2025130    131400  -10.5800 -137.6200      33.1       360       113        60
OIR    2025130    131400  -10.5800 -137.6300      33.1       360       116        60
OIR    2025130    131400  -10.5800 -137.6400      33.1         0       117        60
OIR    2025130    131400  -10.5800 -137.6500      33.1         0       121        60
OIR    2025130    131400  -10.5800 -137.6600      33.2       360       123        60
OIR    2025130    131400  -10.5800 -137.6700      33.2       360       123        60
OIR    2025130    131400  -10.5800 -137.6800      33.1       360       123        60
OIR    2025130    131400  -10.5800 -137.6900      33.0       360       123        60
OIR    2025130    131400  -10.5800 -137.7000      32.9       360       124        60
OIR    2025130    131400  -10.5800 -137.7100      32.8       360       127        60
OIR    2025130    131400  -10.5800 -137.7200      32.5         0       129        60
OIR    2025130    131400  -10.5800 -137.7300      32.2       360       128        60
OIR    2025130    131400  -10.5800 -137.7400      31.8       360       126        60
OIR    2025130    131400  -10.5800 -137.7500      31.3       360       125        60
OIR    2025130    131400  -10.5800 -137.7600      30.5       359       124        60
OIR    2025130    131400  -10.5800 -137.7700      29.4       359       125        60
OIR    2025130    131400  -10.5800 -137.7800      28.5       358       125        60
OIR    2025130    131400  -10.5800 -137.7900      27.9       358       126        60
OIR    2025130    131400  -10.5800 -137.8000      27.5       358       126        60
OIR    2025130    131400  -10.5800 -137.8100      27.1       358       126        60
OIR    2025130    131400  -10.5800 -137.8200      26.9       357       126        60
OIR    2025130    131400  -10.5800 -137.8300      26.7       357       127        60
OIR    2025130    131400  -10.5800 -137.8400      26.7       357       127        60
OIR    2025130    131400  -10.5800 -137.8500      26.6       357       126        60
OIR    2025130    131400  -10.5800 -137.8600      26.5       357       127        60
OIR    2025130    131400  -10.5800 -137.8700      26.5       357       126        60
OIR    2025130    131400  -10.5800 -137.8800      26.4       357       126        60
OIR    2025130    131400  -10.5800 -137.8900      26.4       357       126        60
OIR    2025130    131400  -10.5800 -137.9000      26.4       357       126        60
OIR    2025130    131400  -10.5800 -137.9100      26.4       357       125        60
OIR    2025130    131400  -10.5800 -137.9200      26.4       357       122        60
OIR    2025130    131400  -10.5800 -137.9300      26.4       357       122        60
OIR    2025130    131400  -10.5800 -137.9400      26.4       357       121        60
OIR    2025130    131400  -10.5800 -137.9500      26.4       357       123        60
OIR    2025130    131400  -10.5800 -137.9600      26.5       357       124        60
OIR    2025130    131400  -10.5800 -137.9700      26.5       357       124        60
OIR    2025130    131400  -10.5800 -137.9800      26.5       357       125        60
OIR    2025130    131400  -10.5800 -137.9900      26.5       357       127        60
OIR    2025130    131400  -10.5800 -138.0000      26.5       357       127        60
OIR    2025130    131400  -10.5800 -138.0100      26.6       357       127        60
OIR    2025130    131400  -10.5800 -138.0200      26.6       357       126        60
OIR    2025130    131400  -10.5800 -138.0300      26.6       357       125        60
OIR    2025130    131400  -10.5800 -138.0400      26.6       357       124        60
OIR    2025130    131400  -10.5800 -138.0500      26.6       357       124        60
OIR    2025130    131400  -10.5800 -138.0600      26.7       357       125        60
OIR    2025130    131400  -10.5800 -138.0700      26.7       357       126        60
OIR    2025130    131400  -10.5800 -138.0800      26.7       357       127        60
OIR    2025130    131400  -10.5800 -138.0900      26.7       357       129        60
OIR    2025130    131400  -10.5800 -138.1000      26.8       357       131        60
OIR    2025130    131400  -10.5800 -138.1100      26.8       357       132        60
OIR    2025130    131400  -10.5800 -138.1200      26.9       358       133        60
OIR    2025130    131400  -10.5800 -138.1300      27.0       358       136        60
OIR    2025130    131400  -10.5800 -138.1400      27.0       358       139        60
OIR    2025130    131400  -10.5800 -138.1500      27.1       358       144        60
OIR    2025130    131400  -10.5800 -138.1600      27.1       358       147        60
OIR    2025130    131400  -10.5800 -138.1700      27.1       358       147        60
OIR    2025130    131400  -10.5800 -138.1800      27.1       358       146        60
OIR    2025130    131400  -10.5800 -138.1900      27.2       358       148        60
OIR    2025130    131400  -10.5800 -138.2000      27.2       358       148        60
OIR    2025130    131400  -10.5800 -138.2100      27.2       358       146        60
OIR    2025130    131400  -10.5800 -138.2200      27.2       357       143        60
OIR    2025130    131400  -10.5800 -138.2300      27.1       357       138        60
OIR    2025130    131400  -10.5800 -138.2400      27.2       357       138        60
OIR    2025130    131400  -10.5800 -138.2500      27.3       357       143        60
OIR    2025130    131400  -10.5800 -138.2600      27.3       357       148        60
OIR    2025130    131400  -10.5800 -138.3300      28.4       355       149        60
OIR    2025130    131400  -10.5800 -138.3400      28.3       355       149        60
OIR    2025130    131400  -10.5900 -136.3900      42.2        36       148        60
OIR    2025130    131400  -10.5900 -136.4000      42.2        36       147        60
OIR    2025130    131400  -10.5900 -136.4100      42.2        36       149        60
OIR    2025130    131400  -10.5900 -136.4200      42.3        36       148        60
OIR    2025130    131400  -10.5900 -136.4300      42.3        36       145        60
OIR    2025130    131400  -10.5900 -136.4400      42.3        36       145        60
OIR    2025130    131400  -10.5900 -136.4500      42.3        36       146        60
OIR    2025130    131400  -10.5900 -136.4600      42.3        36       147        60
OIR    2025130    131400  -10.5900 -136.4700      42.3        36       148        60
OIR    2025130    131400  -10.5900 -136.4800      42.2        36       149        60
OIR    2025130    131400  -10.5900 -136.6600      41.6        34       149        60
OIR    2025130    131400  -10.5900 -136.6700      41.3        33       145        60
OIR    2025130    131400  -10.5900 -136.6800      41.1        31       145        60
OIR    2025130    131400  -10.5900 -136.6900      41.0        31       145        60
OIR    2025130    131400  -10.5900 -136.7000      40.9        30       142        60
OIR    2025130    131400  -10.5900 -136.7100      41.0        30       140        60
OIR    2025130    131400  -10.5900 -136.7200      41.1        30       140        60
OIR    2025130    131400  -10.5900 -136.7300      41.3        29       140        60
OIR    2025130    131400  -10.5900 -136.7400      41.4        29       140        60
OIR    2025130    131400  -10.5900 -136.7500      41.4        27       139        60
OIR    2025130    131400  -10.5900 -136.7600      41.3        26       138        60
OIR    2025130    131400  -10.5900 -136.7700      41.2        25       136        60
OIR    2025130    131400  -10.5900 -136.7800      41.1        25       135        60
OIR    2025130    131400  -10.5900 -136.7900      40.8        25       132        60
OIR    2025130    131400  -10.5900 -136.8000      40.6        24       129        60
OIR    2025130    131400  -10.5900 -136.8100      40.4        24       128        60
OIR    2025130    131400  -10.5900 -136.8200      40.3        24       126        60
OIR    2025130    131400  -10.5900 -136.8300      40.2        24       126        60
OIR    2025130    131400  -10.5900 -136.8400      40.2        24       126        60
OIR    2025130    131400  -10.5900 -136.8500      40.2        24       126        60
OIR    2025130    131400  -10.5900 -136.8600      40.3        24       127        60
OIR    2025130    131400  -10.5900 -136.8700      40.3        24       130        60
OIR    2025130    131400  -10.5900 -136.8800      40.3        24       130        60
OIR    2025130    131400  -10.5900 -136.8900      40.3        23       128        60
OIR    2025130    131400  -10.5900 -136.9000      40.3        23       130        60
OIR    2025130    131400  -10.5900 -136.9100      40.3        22       134        60
OIR    2025130    131400  -10.5900 -136.9200      40.3        22       135        60
OIR    2025130    131400  -10.5900 -136.9300      40.2        21       135        60
OIR    2025130    131400  -10.5900 -136.9400      40.2        21       134        60
OIR    2025130    131400  -10.5900 -136.9500      40.1        21       132        60
OIR    2025130    131400  -10.5900 -136.9600      40.1        21       131        60
OIR    2025130    131400  -10.5900 -136.9700      40.1        21       131        60
OIR    2025130    131400  -10.5900 -136.9800      40.1        21       132        60
OIR    2025130    131400  -10.5900 -136.9900      40.1        20       134        60
OIR    2025130    131400  -10.5900 -137.0000      40.2        20       136        60
OIR    2025130    131400  -10.5900 -137.0100      40.2        19       136        60
OIR    2025130    131400  -10.5900 -137.0200      40.2        19       136        60
OIR    2025130    131400  -10.5900 -137.0300      40.3        19       137        60
OIR    2025130    131400  -10.5900 -137.0400      40.3        18       136        60
OIR    2025130    131400  -10.5900 -137.0500      40.3        18       135        60
OIR    2025130    131400  -10.5900 -137.0600      40.3        18       133        60
OIR    2025130    131400  -10.5900 -137.0700      40.4        18       129        60
OIR    2025130    131400  -10.5900 -137.0800      40.4        18       128        60
OIR    2025130    131400  -10.5900 -137.0900      40.4        18       129        60
OIR    2025130    131400  -10.5900 -137.1000      40.4        18       131        60
OIR    2025130    131400  -10.5900 -137.1100      40.5        18       133        60
OIR    2025130    131400  -10.5900 -137.1200      40.5        18       133        60
OIR    2025130    131400  -10.5900 -137.1300      40.7        15       132        60
OIR    2025130    131400  -10.5900 -137.1400      40.8        14       124        60
OIR    2025130    131400  -10.5900 -137.1500      40.6        12       116        60
OIR    2025130    131400  -10.5900 -137.1600      40.7        12       114        60
OIR    2025130    131400  -10.5900 -137.1700      40.8        12       114        60
OIR    2025130    131400  -10.5900 -137.1800      40.8        11       117        60
OIR    2025130    131400  -10.5900 -137.1900      40.8        11       120        60
OIR    2025130    131400  -10.5900 -137.2000      40.8        11       119        60
OIR    2025130    131400  -10.5900 -137.2100      40.7        11       117        60
OIR    2025130    131400  -10.5900 -137.2200      40.7        10       115        60
OIR    2025130    131400  -10.5900 -137.2300      40.6        10       116        60
OIR    2025130    131400  -10.5900 -137.2400      40.5         9       122        60
OIR    2025130    131400  -10.5900 -137.2500      40.4         9       123        60
OIR    2025130    131400  -10.5900 -137.2600      40.4         9       125        60
OIR    2025130    131400  -10.5900 -137.2700      40.3         9       122        60
OIR    2025130    131400  -10.5900 -137.2800      40.3         9       119        60
OIR    2025130    131400  -10.5900 -137.2900      40.3         9       120        60
OIR    2025130    131400  -10.5900 -137.3000      40.2         9       121        60
OIR    2025130    131400  -10.5900 -137.3100      38.6         7       122        60
OIR    2025130    131400  -10.5900 -137.3200      36.9         4       122        60
OIR    2025130    131400  -10.5900 -137.3300      36.8         3       122        60
OIR    2025130    131400  -10.5900 -137.3400      36.8         3       123        60
OIR    2025130    131400  -10.5900 -137.3500      36.9         2       125        60
OIR    2025130    131400  -10.5900 -137.3600      37.4         1       125        60
OIR    2025130    131400  -10.5900 -137.3700      37.6         0       126        60
OIR    2025130    131400  -10.5900 -137.3800      37.6         0       126        60
OIR    2025130    131400  -10.5900 -137.3900      37.6         0       126        60
OIR    2025130    131400  -10.5900 -137.4000      37.6         0       125        60
OIR    2025130    131400  -10.5900 -137.4100      37.6         0       123        60
OIR    2025130    131400  -10.5900 -137.4200      37.6         0       120        60
OIR    2025130    131400  -10.5900 -137.4300      37.5         0       116        60
OIR    2025130    131400  -10.5900 -137.4400      37.4         0       115        60
OIR    2025130    131400  -10.5900 -137.4500      37.2       360       113        60
OIR    2025130    131400  -10.5900 -137.4600      37.1       360       110        60
OIR    2025130    131400  -10.5900 -137.4700      36.9       360       111        60
OIR    2025130    131400  -10.5900 -137.4800      36.8       359       111        60
OIR    2025130    131400  -10.5900 -137.4900      36.7       359       113        60
OIR    2025130    131400  -10.5900 -137.5000      36.6       359       113        60
OIR    2025130    131400  -10.5900 -137.5100      36.5       359       111        60
OIR    2025130    131400  -10.5900 -137.5200      36.4       359       110        60
OIR    2025130    131400  -10.5900 -137.5300      36.2       359       110        60
OIR    2025130    131400  -10.5900 -137.5400      35.9       359       111        60
OIR    2025130    131400  -10.5900 -137.5500      35.3       359       113        60
OIR    2025130    131400  -10.5900 -137.5600      34.8       359       114        60
OIR    2025130    131400  -10.5900 -137.5700      34.4       359       115        60
OIR    2025130    131400  -10.5900 -137.5800      34.0       359       113        60
OIR    2025130    131400  -10.5900 -137.5900      33.6       359       110        60
OIR    2025130    131400  -10.5900 -137.6000      33.4       359       111        60
OIR    2025130    131400  -10.5900 -137.6100      33.2       360       112        60
OIR    2025130    131400  -10.5900 -137.6200      33.2       360       115        60
OIR    2025130    131400  -10.5900 -137.6300      33.2       360       117        60
OIR    2025130    131400  -10.5900 -137.6400      33.2       360       121        60
OIR    2025130    131400  -10.5900 -137.6500      33.2       360       123        60
OIR    2025130    131400  -10.5900 -137.6600      33.4       359       123        60
OIR    2025130    131400  -10.5900 -137.6700      33.4       359       123        60
OIR    2025130    131400  -10.5900 -137.6800      33.3       360       122        60
OIR    2025130    131400  -10.5900 -137.6900      33.1       360       121        60
OIR    2025130    131400  -10.5900 -137.7000      33.0       360       121        60
OIR    2025130    131400  -10.5900 -137.7100      32.9       360       124        60
OIR    2025130    131400  -10.5900 -137.7200      32.7       360       127        60
OIR    2025130    131400  -10.5900 -137.7300      32.4       360       127        60
OIR    2025130    131400  -10.5900 -137.7400      32.0       360       127        60
OIR    2025130    131400  -10.5900 -137.7500      31.7       359       125        60
OIR    2025130    131400  -10.5900 -137.7600      31.2       359       125        60
OIR    2025130    131400  -10.5900 -137.7700      30.2       359       126        60
OIR    2025130    131400  -10.5900 -137.7800      29.4       358       127        60
OIR    2025130    131400  -10.5900 -137.7900      28.6       358       127        60
OIR    2025130    131400  -10.5900 -137.8000      28.0       358       127        60
OIR    2025130    131400  -10.5900 -137.8100      27.5       358       127        60
OIR    2025130    131400  -10.5900 -137.8200      27.2       357       128        60
OIR    2025130    131400  -10.5900 -137.8300      26.9       357       128        60
OIR    2025130    131400  -10.5900 -137.8400      26.8       357       128        60
OIR    2025130    131400  -10.5900 -137.8500      26.7       357       128        60
OIR    2025130    131400  -10.5900 -137.8600      26.6       357       128        60
OIR    2025130    131400  -10.5900 -137.8700      26.5       357       126        60
OIR    2025130    131400  -10.5900 -137.8800      26.5       357       124        60
OIR    2025130    131400  -10.5900 -137.8900      26.4       357       125        60
OIR    2025130    131400  -10.5900 -137.9000      26.4       357       126        60
OIR    2025130    131400  -10.5900 -137.9100      26.4       357       126        60
OIR    2025130    131400  -10.5900 -137.9200      26.4       357       124        60
OIR    2025130    131400  -10.5900 -137.9300      26.4       357       122        60
OIR    2025130    131400  -10.5900 -137.9400      26.5       357       121        60
OIR    2025130    131400  -10.5900 -137.9500      26.5       357       123        60
OIR    2025130    131400  -10.5900 -137.9600      26.5       357       125        60
OIR    2025130    131400  -10.5900 -137.9700      26.5       357       125        60
OIR    2025130    131400  -10.5900 -137.9800      26.5       357       125        60
OIR    2025130    131400  -10.5900 -137.9900      26.5       357       126        60
OIR    2025130    131400  -10.5900 -138.0000      26.6       357       126        60
OIR    2025130    131400  -10.5900 -138.0100      26.6       357       126        60
OIR    2025130    131400  -10.5900 -138.0200      26.6       357       126        60
OIR    2025130    131400  -10.5900 -138.0300      26.6       357       124        60
OIR    2025130    131400  -10.5900 -138.0400      26.6       357       123        60
OIR    2025130    131400  -10.5900 -138.0500      26.7       357       123        60
OIR    2025130    131400  -10.5900 -138.0600      26.7       357       124        60
OIR    2025130    131400  -10.5900 -138.0700      26.7       357       125        60
OIR    2025130    131400  -10.5900 -138.0800      26.7       357       126        60
OIR    2025130    131400  -10.5900 -138.0900      26.8       357       128        60
OIR    2025130    131400  -10.5900 -138.1000      26.8       357       130        60
OIR    2025130    131400  -10.5900 -138.1100      26.9       358       131        60
OIR    2025130    131400  -10.5900 -138.1200      26.9       358       132        60
OIR    2025130    131400  -10.5900 -138.1300      27.0       358       135        60
OIR    2025130    131400  -10.5900 -138.1400      27.0       358       138        60
OIR    2025130    131400  -10.5900 -138.1500      27.1       358       141        60
OIR    2025130    131400  -10.5900 -138.1600      27.1       358       143        60
OIR    2025130    131400  -10.5900 -138.1700      27.1       358       145        60
OIR    2025130    131400  -10.5900 -138.1800      27.1       358       147        60
OIR    2025130    131400  -10.5900 -138.1900      27.1       358       148        60
OIR    2025130    131400  -10.5900 -138.2000      27.2       358       149        60
OIR    2025130    131400  -10.5900 -138.2100      27.1       358       149        60
OIR    2025130    131400  -10.5900 -138.2200      27.1       358       148        60
OIR    2025130    131400  -10.5900 -138.2300      27.1       357       145        60
OIR    2025130    131400  -10.5900 -138.2400      27.1       357       145        60
OIR    2025130    131400  -10.5900 -138.2500      27.1       357       147        60
OIR    2025130    131400  -10.5900 -138.3300      28.1       356       149        60
OIR    2025130    131400  -10.5900 -138.3400      28.0       356       148        60
OIR    2025130    131400  -10.6000 -136.4300      42.3        36       146        60
OIR    2025130    131400  -10.6000 -136.4400      42.3        36       144        60
OIR    2025130    131400  -10.6000 -136.4500      42.3        36       143        60
OIR    2025130    131400  -10.6000 -136.4600      42.3        36       145        60
OIR    2025130    131400  -10.6000 -136.4700      42.3        36       146        60
OIR    2025130    131400  -10.6000 -136.6600      41.4        33       148        60
OIR    2025130    131400  -10.6000 -136.6700      41.1        31       145        60
OIR    2025130    131400  -10.6000 -136.6800      41.0        31       144        60
OIR    2025130    131400  -10.6000 -136.6900      40.9        30       142        60
OIR    2025130    131400  -10.6000 -136.7000      40.8        30       140        60
OIR    2025130    131400  -10.6000 -136.7100      40.8        30       139        60
OIR    2025130    131400  -10.6000 -136.7200      40.9        29       139        60
OIR    2025130    131400  -10.6000 -136.7300      41.1        28       139        60
OIR    2025130    131400  -10.6000 -136.7400      41.1        27       140        60
OIR    2025130    131400  -10.6000 -136.7500      41.1        26       139        60
OIR    2025130    131400  -10.6000 -136.7600      41.1        25       138        60
OIR    2025130    131400  -10.6000 -136.7700      41.0        25       137        60
OIR    2025130    131400  -10.6000 -136.7800      41.0        24       137        60
OIR    2025130    131400  -10.6000 -136.7900      40.8        24       135        60
OIR    2025130    131400  -10.6000 -136.8000      40.6        24       133        60
OIR    2025130    131400  -10.6000 -136.8100      40.4        24       130        60
OIR    2025130    131400  -10.6000 -136.8200      40.3        24       128        60
OIR    2025130    131400  -10.6000 -136.8300      40.3        24       126        60
OIR    2025130    131400  -10.6000 -136.8400      40.3        24       125        60
OIR    2025130    131400  -10.6000 -136.8500      40.3        24       125        60
OIR    2025130    131400  -10.6000 -136.8600      40.3        24       126        60
OIR    2025130    131400  -10.6000 -136.8700      40.3        24       127        60
OIR    2025130    131400  -10.6000 -136.8800      40.3        23       128        60
OIR    2025130    131400  -10.6000 -136.8900      40.3        23       128        60
OIR    2025130    131400  -10.6000 -136.9000      40.3        23       129        60
OIR    2025130    131400  -10.6000 -136.9100      40.3        22       131        60
OIR    2025130    131400  -10.6000 -136.9200      40.2        21       133        60
OIR    2025130    131400  -10.6000 -136.9300      40.2        21       134        60
OIR    2025130    131400  -10.6000 -136.9400      40.2        21       132        60
OIR    2025130    131400  -10.6000 -136.9500      40.2        21       131        60
OIR    2025130    131400  -10.6000 -136.9600      40.2        21       129        60
OIR    2025130    131400  -10.6000 -136.9700      40.1        20       130        60
OIR    2025130    131400  -10.6000 -136.9800      40.2        20       133        60
OIR    2025130    131400  -10.6000 -136.9900      40.2        20       134        60
OIR    2025130    131400  -10.6000 -137.0000      40.2        19       136        60
OIR    2025130    131400  -10.6000 -137.0100      40.3        19       137        60
OIR    2025130    131400  -10.6000 -137.0200      40.3        19       137        60
OIR    2025130    131400  -10.6000 -137.0300      40.3        18       137        60
OIR    2025130    131400  -10.6000 -137.0400      40.3        18       136        60
OIR    2025130    131400  -10.6000 -137.0500      40.3        18       136        60
OIR    2025130    131400  -10.6000 -137.0600      40.4        18       134        60
OIR    2025130    131400  -10.6000 -137.0700      40.4        18       127        60
OIR    2025130    131400  -10.6000 -137.0800      40.4        18       127        60
OIR    2025130    131400  -10.6000 -137.0900      40.4        18       132        60
OIR    2025130    131400  -10.6000 -137.1000      40.4        18       136        60
OIR    2025130    131400  -10.6000 -137.1100      40.5        18       138        60
OIR    2025130    131400  -10.6000 -137.1200      40.5        18       138        60
OIR    2025130    131400  -10.6000 -137.1300      40.5        16       136        60
OIR    2025130    131400  -10.6000 -137.1400      40.6        15       126        60
OIR    2025130    131400  -10.6000 -137.1500      40.5        12       115        60
OIR    2025130    131400  -10.6000 -137.1600      40.6        12       113        60
OIR    2025130    131400  -10.6000 -137.1700      40.8        11       113        60
OIR    2025130    131400  -10.6000 -137.1800      40.8        11       117        60
OIR    2025130    131400  -10.6000 -137.1900      40.8        11       121        60
OIR    2025130    131400  -10.6000 -137.2000      40.8        11       121        60
OIR    2025130    131400  -10.6000 -137.2100      40.8        10       121        60
OIR    2025130    131400  -10.6000 -137.2200      40.9        10       117        60
OIR    2025130    131400  -10.6000 -137.2300      40.7        10       119        60
OIR    2025130    131400  -10.6000 -137.2400      40.6         9       123        60
OIR    2025130    131400  -10.6000 -137.2500      40.4         9       122        60
OIR    2025130    131400  -10.6000 -137.2600      40.4         9       120        60
OIR    2025130    131400  -10.6000 -137.2700      40.3         9       116        60
OIR    2025130    131400  -10.6000 -137.2800      40.3         9       114        60
OIR    2025130    131400  -10.6000 -137.2900      40.2         9       119        60
OIR    2025130    131400  -10.6000 -137.3000      40.0         9       122        60
OIR    2025130    131400  -10.6000 -137.3100      39.5         8       124        60
OIR    2025130    131400  -10.6000 -137.3200      36.9         4       126        60
OIR    2025130    131400  -10.6000 -137.3300      36.8         3       127        60
OIR    2025130    131400  -10.6000 -137.3400      36.8         3       128        60
OIR    2025130    131400  -10.6000 -137.3500      37.2         1       129        60
OIR    2025130    131400  -10.6000 -137.3600      37.5         0       131        60
OIR    2025130    131400  -10.6000 -137.3700      37.6         0       133        60
OIR    2025130    131400  -10.6000 -137.3800      37.6         0       129        60
OIR    2025130    131400  -10.6000 -137.3900      37.6         0       125        60
OIR    2025130    131400  -10.6000 -137.4000      37.6         0       124        60
OIR    2025130    131400  -10.6000 -137.4100      37.6         0       122        60
OIR    2025130    131400  -10.6000 -137.4200      37.5         0       122        60
OIR    2025130    131400  -10.6000 -137.4300      37.5         0       121        60
OIR    2025130    131400  -10.6000 -137.4400      37.4         0       119        60
OIR    2025130    131400  -10.6000 -137.4500      37.2       360       116        60
OIR    2025130    131400  -10.6000 -137.4600      37.0       360       113        60
OIR    2025130    131400  -10.6000 -137.4700      36.8       359       112        60
OIR    2025130    131400  -10.6000 -137.4800      36.7       359       111        60
OIR    2025130    131400  -10.6000 -137.4900      36.7       359       112        60
OIR    2025130    131400  -10.6000 -137.5000      36.6       359       112        60
OIR    2025130    131400  -10.6000 -137.5100      36.6       359       110        60
OIR    2025130    131400  -10.6000 -137.5200      36.5       359       108        60
OIR    2025130    131400  -10.6000 -137.5300      36.3       359       108        60
OIR    2025130    131400  -10.6000 -137.5400      36.1       359       110        60
OIR    2025130    131400  -10.6000 -137.5500      35.6       359       113        60
OIR    2025130    131400  -10.6000 -137.5600      35.2       359       115        60
OIR    2025130    131400  -10.6000 -137.5700      34.8       359       116        60
OIR    2025130    131400  -10.6000 -137.5800      34.4       358       114        60
OIR    2025130    131400  -10.6000 -137.5900      34.0       359       111        60
OIR    2025130    131400  -10.6000 -137.6000      33.7       359       113        60
OIR    2025130    131400  -10.6000 -137.6100      33.4       359       115        60
OIR    2025130    131400  -10.6000 -137.6200      33.3       359       116        60
OIR    2025130    131400  -10.6000 -137.6300      33.2       359       120        60
OIR    2025130    131400  -10.6000 -137.6400      33.3       359       122        60
OIR    2025130    131400  -10.6000 -137.6500      33.6       359       123        60
OIR    2025130    131400  -10.6000 -137.6600      33.8       358       122        60
OIR    2025130    131400  -10.6000 -137.6700      33.8       358       121        60
OIR    2025130    131400  -10.6000 -137.6800      33.8       359       119        60
OIR    2025130    131400  -10.6000 -137.6900      33.5       359       119        60
OIR    2025130    131400  -10.6000 -137.7000      33.2       359       117        60
OIR    2025130    131400  -10.6000 -137.7100      33.0       359       121        60
OIR    2025130    131400  -10.6000 -137.7200      32.8       359       125        60
OIR    2025130    131400  -10.6000 -137.7300      32.5       359       126        60
OIR    2025130    131400  -10.6000 -137.7400      32.2       359       127        60
OIR    2025130    131400  -10.6000 -137.7500      31.9       359       125        60
OIR    2025130    131400  -10.6000 -137.7600      31.6       359       125        60
OIR    2025130    131400  -10.6000 -137.7700      31.1       358       127        60
OIR    2025130    131400  -10.6000 -137.7800      30.2       358       128        60
OIR    2025130    131400  -10.6000 -137.7900      29.3       358       128        60
OIR    2025130    131400  -10.6000 -137.8000      28.6       358       128        60
OIR    2025130    131400  -10.6000 -137.8100      28.0       357       128        60
OIR    2025130    131400  -10.6000 -137.8200      27.6       357       129        60
OIR    2025130    131400  -10.6000 -137.8300      27.3       357       129        60
OIR    2025130    131400  -10.6000 -137.8400      27.0       357       129        60
OIR    2025130    131400  -10.6000 -137.8500      26.8       357       130        60
OIR    2025130    131400  -10.6000 -137.8600      26.7       357       129        60
OIR    2025130    131400  -10.6000 -137.8700      26.6       357       127        60
OIR    2025130    131400  -10.6000 -137.8800      26.5       357       124        60
OIR    2025130    131400  -10.6000 -137.8900      26.5       357       124        60
OIR    2025130    131400  -10.6000 -137.9000      26.5       357       126        60
OIR    2025130    131400  -10.6000 -137.9100      26.5       357       126        60
OIR    2025130    131400  -10.6000 -137.9200      26.5       357       125        60
OIR    2025130    131400  -10.6000 -137.9300      26.5       357       123        60
OIR    2025130    131400  -10.6000 -137.9400      26.5       357       122        60
OIR    2025130    131400  -10.6000 -137.9500      26.5       357       124        60
OIR    2025130    131400  -10.6000 -137.9600      26.5       357       125        60
OIR    2025130    131400  -10.6000 -137.9700      26.5       357       126        60
OIR    2025130    131400  -10.6000 -137.9800      26.6       357       126        60
OIR    2025130    131400  -10.6000 -137.9900      26.6       357       125        60
OIR    2025130    131400  -10.6000 -138.0000      26.6       357       125        60
OIR    2025130    131400  -10.6000 -138.0100      26.6       357       125        60
OIR    2025130    131400  -10.6000 -138.0200      26.6       357       125        60
OIR    2025130    131400  -10.6000 -138.0300      26.6       357       124        60
OIR    2025130    131400  -10.6000 -138.0400      26.6       357       123        60
OIR    2025130    131400  -10.6000 -138.0500      26.7       357       122        60
OIR    2025130    131400  -10.6000 -138.0600      26.7       357       123        60
OIR    2025130    131400  -10.6000 -138.0700      26.7       357       125        60
OIR    2025130    131400  -10.6000 -138.0800      26.8       357       126        60
OIR    2025130    131400  -10.6000 -138.0900      26.8       357       127        60
OIR    2025130    131400  -10.6000 -138.1000      26.9       358       129        60
OIR    2025130    131400  -10.6000 -138.1100      26.9       358       130        60
OIR    2025130    131400  -10.6000 -138.1200      27.0       358       131        60
OIR    2025130    131400  -10.6000 -138.1300      27.0       358       133        60
OIR    2025130    131400  -10.6000 -138.1400      27.0       358       136        60
OIR    2025130    131400  -10.6000 -138.1500      27.0       358       137        60
OIR    2025130    131400  -10.6000 -138.1600      27.1       358       139        60
OIR    2025130    131400  -10.6000 -138.1700      27.1       358       142        60
OIR    2025130    131400  -10.6000 -138.1800      27.1       358       145        60
OIR    2025130    131400  -10.6000 -138.1900      27.1       358       147        60
OIR    2025130    131400  -10.6000 -138.2000      27.1       358       149        60
OIR    2025130    131400  -10.6000 -138.3300      27.6       357       149        60
OIR    2025130    131400  -10.6000 -138.3400      27.6       357       148        60
OIR    2025130    131400  -10.6100 -136.4200      42.3        36       148        60
OIR    2025130    131400  -10.6100 -136.4300      42.3        36       145        60
OIR    2025130    131400  -10.6100 -136.4400      42.3        36       144        60
OIR    2025130    131400  -10.6100 -136.4500      42.3        36       143        60
OIR    2025130    131400  -10.6100 -136.4600      42.3        36       146        60
OIR    2025130    131400  -10.6100 -136.4700      42.3        36       148        60
OIR    2025130    131400  -10.6100 -136.6600      41.2        32       148        60
OIR    2025130    131400  -10.6100 -136.6700      41.0        31       146        60
OIR    2025130    131400  -10.6100 -136.6800      41.0        30       146        60
OIR    2025130    131400  -10.6100 -136.6900      40.9        30       145        60
OIR    2025130    131400  -10.6100 -136.7000      40.8        30       141        60
OIR    2025130    131400  -10.6100 -136.7100      40.7        29       139        60
OIR    2025130    131400  -10.6100 -136.7200      40.7        28       139        60
OIR    2025130    131400  -10.6100 -136.7300      40.9        27       139        60
OIR    2025130    131400  -10.6100 -136.7400      41.0        26       138        60
OIR    2025130    131400  -10.6100 -136.7500      41.0        25       137        60
OIR    2025130    131400  -10.6100 -136.7600      41.0        24       136        60
OIR    2025130    131400  -10.6100 -136.7700      41.0        24       135        60
OIR    2025130    131400  -10.6100 -136.7800      40.9        24       134        60
OIR    2025130    131400  -10.6100 -136.7900      40.8        24       133        60
OIR    2025130    131400  -10.6100 -136.8000      40.6        24       132        60
OIR    2025130    131400  -10.6100 -136.8100      40.5        24       131        60
OIR    2025130    131400  -10.6100 -136.8200      40.4        24       130        60
OIR    2025130    131400  -10.6100 -136.8300      40.3        24       129        60
OIR    2025130    131400  -10.6100 -136.8400      40.3        24       128        60
OIR    2025130    131400  -10.6100 -136.8500      40.3        24       128        60
OIR    2025130    131400  -10.6100 -136.8600      40.3        24       127        60
OIR    2025130    131400  -10.6100 -136.8700      40.3        23       125        60
OIR    2025130    131400  -10.6100 -136.8800      40.3        23       125        60
OIR    2025130    131400  -10.6100 -136.8900      40.3        23       125        60
OIR    2025130    131400  -10.6100 -136.9000      40.3        22       127        60
OIR    2025130    131400  -10.6100 -136.9100      40.2        21       129        60
OIR    2025130    131400  -10.6100 -136.9200      40.2        21       130        60
OIR    2025130    131400  -10.6100 -136.9300      40.2        21       131        60
OIR    2025130    131400  -10.6100 -136.9400      40.2        21       131        60
OIR    2025130    131400  -10.6100 -136.9500      40.2        20       131        60
OIR    2025130    131400  -10.6100 -136.9600      40.2        20       130        60
OIR    2025130    131400  -10.6100 -136.9700      40.2        20       130        60
OIR    2025130    131400  -10.6100 -136.9800      40.2        20       130        60
OIR    2025130    131400  -10.6100 -136.9900      40.2        20       131        60
OIR    2025130    131400  -10.6100 -137.0000      40.3        19       132        60
OIR    2025130    131400  -10.6100 -137.0100      40.3        19       133        60
OIR    2025130    131400  -10.6100 -137.0200      40.3        18       133        60
OIR    2025130    131400  -10.6100 -137.0300      40.4        18       135        60
OIR    2025130    131400  -10.6100 -137.0400      40.4        18       135        60
OIR    2025130    131400  -10.6100 -137.0500      40.4        18       134        60
OIR    2025130    131400  -10.6100 -137.0600      40.4        18       132        60
OIR    2025130    131400  -10.6100 -137.0700      40.4        18       129        60
OIR    2025130    131400  -10.6100 -137.0800      40.4        18       128        60
OIR    2025130    131400  -10.6100 -137.0900      40.4        18       130        60
OIR    2025130    131400  -10.6100 -137.1000      40.4        18       133        60
OIR    2025130    131400  -10.6100 -137.1100      40.5        18       137        60
OIR    2025130    131400  -10.6100 -137.1200      40.5        18       136        60
OIR    2025130    131400  -10.6100 -137.1300      40.5        16       133        60
OIR    2025130    131400  -10.6100 -137.1400      40.5        15       123        60
OIR    2025130    131400  -10.6100 -137.1500      40.5        13       115        60
OIR    2025130    131400  -10.6100 -137.1600      40.6        12       113        60
OIR    2025130    131400  -10.6100 -137.1700      40.8        11       112        60
OIR    2025130    131400  -10.6100 -137.1800      40.8        11       117        60
OIR    2025130    131400  -10.6100 -137.1900      40.9        11       121        60
OIR    2025130    131400  -10.6100 -137.2000      41.0        11       119        60
OIR    2025130    131400  -10.6100 -137.2100      41.0        10       117        60
OIR    2025130    131400  -10.6100 -137.2200      41.0        10       116        60
OIR    2025130    131400  -10.6100 -137.2300      40.9        10       119        60
OIR    2025130    131400  -10.6100 -137.2400      40.8         9       124        60
OIR    2025130    131400  -10.6100 -137.2500      40.5         9       121        60
OIR    2025130    131400  -10.6100 -137.2600      40.4         9       119        60
OIR    2025130    131400  -10.6100 -137.2700      40.3         9       115        60
OIR    2025130    131400  -10.6100 -137.2800      40.3         9       112        60
OIR    2025130    131400  -10.6100 -137.2900      40.0         8       116        60
OIR    2025130    131400  -10.6100 -137.3000      39.8         9       120        60
OIR    2025130    131400  -10.6100 -137.3100      39.2         8       124        60
OIR    2025130    131400  -10.6100 -137.3200      37.0         4       128        60
OIR    2025130    131400  -10.6100 -137.3300      36.8         3       130        60
OIR    2025130    131400  -10.6100 -137.3400      36.9         2       132        60
OIR    2025130    131400  -10.6100 -137.3500      37.4         1       134        60
OIR    2025130    131400  -10.6100 -137.3600      37.6         0       133        60
OIR    2025130    131400  -10.6100 -137.3700      37.6         0       133        60
OIR    2025130    131400  -10.6100 -137.3800      37.6         0       124        60
OIR    2025130    131400  -10.6100 -137.3900      37.6         0       116        60
OIR    2025130    131400  -10.6100 -137.4000      37.5         0       117        60
OIR    2025130    131400  -10.6100 -137.4100      37.5         0       119        60
OIR    2025130    131400  -10.6100 -137.4200      37.5         0       121        60
OIR    2025130    131400  -10.6100 -137.4300      37.5         0       121        60
OIR    2025130    131400  -10.6100 -137.4400      37.4         0       120        60
OIR    2025130    131400  -10.6100 -137.4500      37.2       360       117        60
OIR    2025130    131400  -10.6100 -137.4600      36.9       359       115        60
OIR    2025130    131400  -10.6100 -137.4700      36.8       359       113        60
OIR    2025130    131400  -10.6100 -137.4800      36.7       359       112        60
OIR    2025130    131400  -10.6100 -137.4900      36.6       359       112        60
OIR    2025130    131400  -10.6100 -137.5000      36.6       359       112        60
OIR    2025130    131400  -10.6100 -137.5100      36.6       359       110        60
OIR    2025130    131400  -10.6100 -137.5200      36.5       359       108        60
OIR    2025130    131400  -10.6100 -137.5300      36.4       359       108        60
OIR    2025130    131400  -10.6100 -137.5400      36.2       359       109        60
OIR    2025130    131400  -10.6100 -137.5500      35.8       358       112        60
OIR    2025130    131400  -10.6100 -137.5600      35.4       358       114        60
OIR    2025130    131400  -10.6100 -137.5700      35.1       358       116        60
OIR    2025130    131400  -10.6100 -137.5800      34.8       358       115        60
OIR    2025130    131400  -10.6100 -137.5900      34.4       358       113        60
OIR    2025130    131400  -10.6100 -137.6000      34.0       358       115        60
OIR    2025130    131400  -10.6100 -137.6100      33.6       359       116        60
OIR    2025130    131400  -10.6100 -137.6200      33.4       359       119        60
OIR    2025130    131400  -10.6100 -137.6300      33.4       359       120        60
OIR    2025130    131400  -10.6100 -137.6400      33.5       359       121        60
OIR    2025130    131400  -10.6100 -137.6500      33.9       358       120        60
OIR    2025130    131400  -10.6100 -137.6600      34.0       358       116        60
OIR    2025130    131400  -10.6100 -137.6700      34.0       358       116        60
OIR    2025130    131400  -10.6100 -137.6800      33.9       358       116        60
OIR    2025130    131400  -10.6100 -137.6900      33.8       358       116        60
OIR    2025130    131400  -10.6100 -137.7000      33.5       358       115        60
OIR    2025130    131400  -10.6100 -137.7100      33.2       359       116        60
OIR    2025130    131400  -10.6100 -137.7200      33.0       359       119        60
OIR    2025130    131400  -10.6100 -137.7300      32.7       359       122        60
OIR    2025130    131400  -10.6100 -137.7400      32.4       359       125        60
OIR    2025130    131400  -10.6100 -137.7500      32.1       359       125        60
OIR    2025130    131400  -10.6100 -137.7600      31.8       359       125        60
OIR    2025130    131400  -10.6100 -137.7700      31.5       358       127        60
OIR    2025130    131400  -10.6100 -137.7800      30.8       358       128        60
OIR    2025130    131400  -10.6100 -137.7900      29.9       358       129        60
OIR    2025130    131400  -10.6100 -137.8000      29.2       357       129        60
OIR    2025130    131400  -10.6100 -137.8100      28.6       357       129        60
OIR    2025130    131400  -10.6100 -137.8200      28.2       357       129        60
OIR    2025130    131400  -10.6100 -137.8300      27.8       357       129        60
OIR    2025130    131400  -10.6100 -137.8400      27.4       357       129        60
OIR    2025130    131400  -10.6100 -137.8500      27.1       357       130        60
OIR    2025130    131400  -10.6100 -137.8600      26.9       357       130        60
OIR    2025130    131400  -10.6100 -137.8700      26.7       357       128        60
OIR    2025130    131400  -10.6100 -137.8800      26.6       357       125        60
OIR    2025130    131400  -10.6100 -137.8900      26.5       357       126        60
OIR    2025130    131400  -10.6100 -137.9000      26.5       357       127        60
OIR    2025130    131400  -10.6100 -137.9100      26.5       357       126        60
OIR    2025130    131400  -10.6100 -137.9200      26.5       357       123        60
OIR    2025130    131400  -10.6100 -137.9300      26.5       357       123        60
OIR    2025130    131400  -10.6100 -137.9400      26.5       357       123        60
OIR    2025130    131400  -10.6100 -137.9500      26.5       357       124        60
OIR    2025130    131400  -10.6100 -137.9600      26.6       357       125        60
OIR    2025130    131400  -10.6100 -137.9700      26.6       357       125        60
OIR    2025130    131400  -10.6100 -137.9800      26.6       357       125        60
OIR    2025130    131400  -10.6100 -137.9900      26.6       357       125        60
OIR    2025130    131400  -10.6100 -138.0000      26.6       357       125        60
OIR    2025130    131400  -10.6100 -138.0100      26.6       357       125        60
OIR    2025130    131400  -10.6100 -138.0200      26.6       357       124        60
OIR    2025130    131400  -10.6100 -138.0300      26.6       357       123        60
OIR    2025130    131400  -10.6100 -138.0400      26.7       357       123        60
OIR    2025130    131400  -10.6100 -138.0500      26.7       357       123        60
OIR    2025130    131400  -10.6100 -138.0600      26.7       357       123        60
OIR    2025130    131400  -10.6100 -138.0700      26.8       357       124        60
OIR    2025130    131400  -10.6100 -138.0800      26.8       357       126        60
OIR    2025130    131400  -10.6100 -138.0900      26.9       357       128        60
OIR    2025130    131400  -10.6100 -138.1000      26.9       358       129        60
OIR    2025130    131400  -10.6100 -138.1100      26.9       358       130        60
OIR    2025130    131400  -10.6100 -138.1200      27.0       358       130        60
OIR    2025130    131400  -10.6100 -138.1300      27.0       358       131        60
OIR    2025130    131400  -10.6100 -138.1400      27.0       358       133        60
OIR    2025130    131400  -10.6100 -138.1500      27.0       358       134        60
OIR    2025130    131400  -10.6100 -138.1600      27.1       358       135        60
OIR    2025130    131400  -10.6100 -138.1700      27.1       358       138        60
OIR    2025130    131400  -10.6100 -138.1800      27.1       358       141        60
OIR    2025130    131400  -10.6100 -138.1900      27.1       358       142        60
OIR    2025130    131400  -10.6100 -138.2000      27.1       358       145        60
OIR    2025130    131400  -10.6100 -138.2100      27.1       358       149        60
OIR    2025130    131400  -10.6100 -138.3600      27.3       358       149        60
OIR    2025130    131400  -10.6200 -136.4100      42.3        36       148        60
OIR    2025130    131400  -10.6200 -136.4200      42.3        36       146        60
OIR    2025130    131400  -10.6200 -136.4300      42.3        36       145        60
OIR    2025130    131400  -10.6200 -136.4400      42.3        36       144        60
OIR    2025130    131400  -10.6200 -136.4500      42.3        36       144        60
OIR    2025130    131400  -10.6200 -136.4600      42.3        36       147        60
OIR    2025130    131400  -10.6200 -136.4700      42.3        36       149        60
OIR    2025130    131400  -10.6200 -136.6600      41.1        32       149        60
OIR    2025130    131400  -10.6200 -136.6700      41.0        31       148        60
OIR    2025130    131400  -10.6200 -136.6800      41.0        30       148        60
OIR    2025130    131400  -10.6200 -136.6900      40.8        29       148        60
OIR    2025130    131400  -10.6200 -136.7000      40.7        29       142        60
OIR    2025130    131400  -10.6200 -136.7100      40.6        28       139        60
OIR    2025130    131400  -10.6200 -136.7200      40.7        27       139        60
OIR    2025130    131400  -10.6200 -136.7300      40.8        26       138        60
OIR    2025130    131400  -10.6200 -136.7400      41.0        25       137        60
OIR    2025130    131400  -10.6200 -136.7500      41.0        24       135        60
OIR    2025130    131400  -10.6200 -136.7600      41.0        24       134        60
OIR    2025130    131400  -10.6200 -136.7700      40.9        24       133        60
OIR    2025130    131400  -10.6200 -136.7800      40.9        24       132        60
OIR    2025130    131400  -10.6200 -136.7900      40.8        24       132        60
OIR    2025130    131400  -10.6200 -136.8000      40.7        24       132        60
OIR    2025130    131400  -10.6200 -136.8100      40.5        24       132        60
OIR    2025130    131400  -10.6200 -136.8200      40.4        24       133        60
OIR    2025130    131400  -10.6200 -136.8300      40.3        24       131        60
OIR    2025130    131400  -10.6200 -136.8400      40.3        24       130        60
OIR    2025130    131400  -10.6200 -136.8500      40.3        23       130        60
OIR    2025130    131400  -10.6200 -136.8600      40.3        23       127        60
OIR    2025130    131400  -10.6200 -136.8700      40.3        23       123        60
OIR    2025130    131400  -10.6200 -136.8800      40.2        23       123        60
OIR    2025130    131400  -10.6200 -136.8900      40.2        23       123        60
OIR    2025130    131400  -10.6200 -136.9000      40.2        22       125        60
OIR    2025130    131400  -10.6200 -136.9100      40.2        21       128        60
OIR    2025130    131400  -10.6200 -136.9200      40.2        21       128        60
OIR    2025130    131400  -10.6200 -136.9300      40.2        20       128        60
OIR    2025130    131400  -10.6200 -136.9400      40.2        20       129        60
OIR    2025130    131400  -10.6200 -136.9500      40.2        20       130        60
OIR    2025130    131400  -10.6200 -136.9600      40.3        20       130        60
OIR    2025130    131400  -10.6200 -136.9700      40.3        20       129        60
OIR    2025130    131400  -10.6200 -136.9800      40.3        20       127        60
OIR    2025130    131400  -10.6200 -136.9900      40.3        19       128        60
OIR    2025130    131400  -10.6200 -137.0000      40.4        19       129        60
OIR    2025130    131400  -10.6200 -137.0100      40.4        18       129        60
OIR    2025130    131400  -10.6200 -137.0200      40.4        18       129        60
OIR    2025130    131400  -10.6200 -137.0300      40.4        18       133        60
OIR    2025130    131400  -10.6200 -137.0400      40.4        18       134        60
OIR    2025130    131400  -10.6200 -137.0500      40.4        18       132        60
OIR    2025130    131400  -10.6200 -137.0600      40.4        18       130        60
OIR    2025130    131400  -10.6200 -137.0700      40.4        18       130        60
OIR    2025130    131400  -10.6200 -137.0800      40.4        18       129        60
OIR    2025130    131400  -10.6200 -137.0900      40.4        18       129        60
OIR    2025130    131400  -10.6200 -137.1000      40.4        18       132        60
OIR    2025130    131400  -10.6200 -137.1100      40.5        18       136        60
OIR    2025130    131400  -10.6200 -137.1200      40.5        18       135        60
OIR    2025130    131400  -10.6200 -137.1300      40.7        17       132        60
OIR    2025130    131400  -10.6200 -137.1400      40.7        15       124        60
OIR    2025130    131400  -10.6200 -137.1500      40.8        14       117        60
OIR    2025130    131400  -10.6200 -137.1600      40.9        13       114        60
OIR    2025130    131400  -10.6200 -137.1700      40.9        11       113        60
OIR    2025130    131400  -10.6200 -137.1800      41.0        11       120        60
OIR    2025130    131400  -10.6200 -137.1900      41.1        11       122        60
OIR    2025130    131400  -10.6200 -137.2000      41.1        11       120        60
OIR    2025130    131400  -10.6200 -137.2100      41.2        11       119        60
OIR    2025130    131400  -10.6200 -137.2200      41.2        10       116        60
OIR    2025130    131400  -10.6200 -137.2300      41.1        10       120        60
OIR    2025130    131400  -10.6200 -137.2400      40.9        10       125        60
OIR    2025130    131400  -10.6200 -137.2500      40.5         9       123        60
OIR    2025130    131400  -10.6200 -137.2600      40.4         9       121        60
OIR    2025130    131400  -10.6200 -137.2700      40.3         9       116        60
OIR    2025130    131400  -10.6200 -137.2800      40.2         9       112        60
OIR    2025130    131400  -10.6200 -137.2900      39.7         8       115        60
OIR    2025130    131400  -10.6200 -137.3000      39.4         8       119        60
OIR    2025130    131400  -10.6200 -137.3100      39.0         8       124        60
OIR    2025130    131400  -10.6200 -137.3200      37.4         4       128        60
OIR    2025130    131400  -10.6200 -137.3300      37.3         3       132        60
OIR    2025130    131400  -10.6200 -137.3400      37.4         1       135        60
OIR    2025130    131400  -10.6200 -137.3500      37.5         0       138        60
OIR    2025130    131400  -10.6200 -137.3600      37.5         0       135        60
OIR    2025130    131400  -10.6200 -137.3700      37.5         0       132        60
OIR    2025130    131400  -10.6200 -137.3800      37.5         0       122        60
OIR    2025130    131400  -10.6200 -137.3900      37.5         0       113        60
OIR    2025130    131400  -10.6200 -137.4000      37.5         0       115        60
OIR    2025130    131400  -10.6200 -137.4100      37.5         0       117        60
OIR    2025130    131400  -10.6200 -137.4200      37.5         0       121        60
OIR    2025130    131400  -10.6200 -137.4300      37.5         0       122        60
OIR    2025130    131400  -10.6200 -137.4400      37.4         0       121        60
OIR    2025130    131400  -10.6200 -137.4500      37.1       360       119        60
OIR    2025130    131400  -10.6200 -137.4600      36.8       359       117        60
OIR    2025130    131400  -10.6200 -137.4700      36.7       359       116        60
OIR    2025130    131400  -10.6200 -137.4800      36.7       359       114        60
OIR    2025130    131400  -10.6200 -137.4900      36.7       359       113        60
OIR    2025130    131400  -10.6200 -137.5000      36.6       358       113        60
OIR    2025130    131400  -10.6200 -137.5100      36.6       358       110        60
OIR    2025130    131400  -10.6200 -137.5200      36.5       358       109        60
OIR    2025130    131400  -10.6200 -137.5300      36.4       358       110        60
OIR    2025130    131400  -10.6200 -137.5400      36.2       358       111        60
OIR    2025130    131400  -10.6200 -137.5500      36.0       358       112        60
OIR    2025130    131400  -10.6200 -137.5600      35.6       358       114        60
OIR    2025130    131400  -10.6200 -137.5700      35.3       358       116        60
OIR    2025130    131400  -10.6200 -137.5800      35.0       358       116        60
OIR    2025130    131400  -10.6200 -137.5900      34.7       358       115        60
OIR    2025130    131400  -10.6200 -137.6000      34.3       358       116        60
OIR    2025130    131400  -10.6200 -137.6100      34.0       358       117        60
OIR    2025130    131400  -10.6200 -137.6200      33.8       358       119        60
OIR    2025130    131400  -10.6200 -137.6300      33.9       358       120        60
OIR    2025130    131400  -10.6200 -137.6400      34.1       357       119        60
OIR    2025130    131400  -10.6200 -137.6500      34.2       357       117        60
OIR    2025130    131400  -10.6200 -137.6600      34.1       357       114        60
OIR    2025130    131400  -10.6200 -137.6700      34.1       357       113        60
OIR    2025130    131400  -10.6200 -137.6800      34.0       358       113        60
OIR    2025130    131400  -10.6200 -137.6900      33.9       358       113        60
OIR    2025130    131400  -10.6200 -137.7000      33.7       358       113        60
OIR    2025130    131400  -10.6200 -137.7100      33.4       358       115        60
OIR    2025130    131400  -10.6200 -137.7200      33.2       358       116        60
OIR    2025130    131400  -10.6200 -137.7300      32.9       359       120        60
OIR    2025130    131400  -10.6200 -137.7400      32.6       359       123        60
OIR    2025130    131400  -10.6200 -137.7500      32.3       358       124        60
OIR    2025130    131400  -10.6200 -137.7600      32.0       358       125        60
OIR    2025130    131400  -10.6200 -137.7700      31.8       358       126        60
OIR    2025130    131400  -10.6200 -137.7800      31.3       358       128        60
OIR    2025130    131400  -10.6200 -137.7900      30.5       357       129        60
OIR    2025130    131400  -10.6200 -137.8000      29.7       357       129        60
OIR    2025130    131400  -10.6200 -137.8100      29.1       357       129        60
OIR    2025130    131400  -10.6200 -137.8200      28.6       357       128        60
OIR    2025130    131400  -10.6200 -137.8300      28.2       357       128        60
OIR    2025130    131400  -10.6200 -137.8400      27.9       357       129        60
OIR    2025130    131400  -10.6200 -137.8500      27.5       357       130        60
OIR    2025130    131400  -10.6200 -137.8600      27.1       357       131        60
OIR    2025130    131400  -10.6200 -137.8700      26.9       357       130        60
OIR    2025130    131400  -10.6200 -137.8800      26.7       357       127        60
OIR    2025130    131400  -10.6200 -137.8900      26.6       357       127        60
OIR    2025130    131400  -10.6200 -137.9000      26.6       357       127        60
OIR    2025130    131400  -10.6200 -137.9100      26.6       357       126        60
OIR    2025130    131400  -10.6200 -137.9200      26.6       357       123        60
OIR    2025130    131400  -10.6200 -137.9300      26.6       357       124        60
OIR    2025130    131400  -10.6200 -137.9400      26.6       357       125        60
OIR    2025130    131400  -10.6200 -137.9500      26.6       357       125        60
OIR    2025130    131400  -10.6200 -137.9600      26.6       357       126        60
OIR    2025130    131400  -10.6200 -137.9700      26.6       357       126        60
OIR    2025130    131400  -10.6200 -137.9800      26.6       357       126        60
OIR    2025130    131400  -10.6200 -137.9900      26.6       357       126        60
OIR    2025130    131400  -10.6200 -138.0000      26.6       357       126        60
OIR    2025130    131400  -10.6200 -138.0100      26.6       357       126        60
OIR    2025130    131400  -10.6200 -138.0200      26.6       357       125        60
OIR    2025130    131400  -10.6200 -138.0300      26.6       357       124        60
OIR    2025130    131400  -10.6200 -138.0400      26.7       357       124        60
OIR    2025130    131400  -10.6200 -138.0500      26.7       357       124        60
OIR    2025130    131400  -10.6200 -138.0600      26.7       357       125        60
OIR    2025130    131400  -10.6200 -138.0700      26.8       357       126        60
OIR    2025130    131400  -10.6200 -138.0800      26.8       357       128        60
OIR    2025130    131400  -10.6200 -138.0900      26.9       358       130        60
OIR    2025130    131400  -10.6200 -138.1000      26.9       358       131        60
OIR    2025130    131400  -10.6200 -138.1100      26.9       358       131        60
OIR    2025130    131400  -10.6200 -138.1200      27.0       358       130        60
OIR    2025130    131400  -10.6200 -138.1300      27.0       358       130        60
OIR    2025130    131400  -10.6200 -138.1400      27.0       358       131        60
OIR    2025130    131400  -10.6200 -138.1500      27.0       358       132        60
OIR    2025130    131400  -10.6200 -138.1600      27.0       358       133        60
OIR    2025130    131400  -10.6200 -138.1700      27.1       358       135        60
OIR    2025130    131400  -10.6200 -138.1800      27.1       358       138        60
OIR    2025130    131400  -10.6200 -138.1900      27.1       358       140        60
OIR    2025130    131400  -10.6200 -138.2000      27.1       358       143        60
OIR    2025130    131400  -10.6200 -138.2100      27.1       358       149        60
OIR    2025130    131400  -10.6300 -136.6700      41.0        30       148        60
OIR    2025130    131400  -10.6300 -136.6800      41.0        30       148        60
OIR    2025130    131400  -10.6300 -136.6900      40.9        29       147        60
OIR    2025130    131400  -10.6300 -136.7000      40.8        27       144        60
OIR    2025130    131400  -10.6300 -136.7100      40.7        26       141        60
OIR    2025130    131400  -10.6300 -136.7200      40.8        25       139        60
OIR    2025130    131400  -10.6300 -136.7300      40.9        25       138        60
OIR    2025130    131400  -10.6300 -136.7400      41.0        24       136        60
OIR    2025130    131400  -10.6300 -136.7500      41.0        24       135        60
OIR    2025130    131400  -10.6300 -136.7600      41.0        24       135        60
OIR    2025130    131400  -10.6300 -136.7700      41.0        24       133        60
OIR    2025130    131400  -10.6300 -136.7800      40.9        24       132        60
OIR    2025130    131400  -10.6300 -136.7900      40.9        24       132        60
OIR    2025130    131400  -10.6300 -136.8000      40.7        24       132        60
OIR    2025130    131400  -10.6300 -136.8100      40.6        24       132        60
OIR    2025130    131400  -10.6300 -136.8200      40.5        24       132        60
OIR    2025130    131400  -10.6300 -136.8300      40.4        23       131        60
OIR    2025130    131400  -10.6300 -136.8400      40.3        23       130        60
OIR    2025130    131400  -10.6300 -136.8500      40.3        23       129        60
OIR    2025130    131400  -10.6300 -136.8600      40.2        23       127        60
OIR    2025130    131400  -10.6300 -136.8700      40.2        23       126        60
OIR    2025130    131400  -10.6300 -136.8800      40.1        23       125        60
OIR    2025130    131400  -10.6300 -136.8900      40.0        22       125        60
OIR    2025130    131400  -10.6300 -136.9000      40.1        21       126        60
OIR    2025130    131400  -10.6300 -136.9100      40.2        21       129        60
OIR    2025130    131400  -10.6300 -136.9200      40.2        21       129        60
OIR    2025130    131400  -10.6300 -136.9300      40.2        20       128        60
OIR    2025130    131400  -10.6300 -136.9400      40.2        20       127        60
OIR    2025130    131400  -10.6300 -136.9500      40.3        20       127        60
OIR    2025130    131400  -10.6300 -136.9600      40.3        20       127        60
OIR    2025130    131400  -10.6300 -136.9700      40.3        19       126        60
OIR    2025130    131400  -10.6300 -136.9800      40.4        19       122        60
OIR    2025130    131400  -10.6300 -136.9900      40.4        19       123        60
OIR    2025130    131400  -10.6300 -137.0000      40.4        18       124        60
OIR    2025130    131400  -10.6300 -137.0100      40.4        18       125        60
OIR    2025130    131400  -10.6300 -137.0200      40.4        18       125        60
OIR    2025130    131400  -10.6300 -137.0300      40.4        18       132        60
OIR    2025130    131400  -10.6300 -137.0400      40.4        18       135        60
OIR    2025130    131400  -10.6300 -137.0500      40.4        18       132        60
OIR    2025130    131400  -10.6300 -137.0600      40.4        18       129        60
OIR    2025130    131400  -10.6300 -137.0700      40.4        18       129        60
OIR    2025130    131400  -10.6300 -137.0800      40.4        18       129        60
OIR    2025130    131400  -10.6300 -137.0900      40.4        18       130        60
OIR    2025130    131400  -10.6300 -137.1000      40.5        18       133        60
OIR    2025130    131400  -10.6300 -137.1100      40.5        18       136        60
OIR    2025130    131400  -10.6300 -137.1200      40.5        18       136        60
OIR    2025130    131400  -10.6300 -137.1300      40.7        17       135        60
OIR    2025130    131400  -10.6300 -137.1400      40.8        15       127        60
OIR    2025130    131400  -10.6300 -137.1500      41.0        15       121        60
OIR    2025130    131400  -10.6300 -137.1600      41.0        14       119        60
OIR    2025130    131400  -10.6300 -137.1700      41.1        12       116        60
OIR    2025130    131400  -10.6300 -137.1800      41.2        11       124        60
OIR    2025130    131400  -10.6300 -137.1900      41.3        11       127        60
OIR    2025130    131400  -10.6300 -137.2000      41.3        11       127        60
OIR    2025130    131400  -10.6300 -137.2100      41.3        11       126        60
OIR    2025130    131400  -10.6300 -137.2200      41.3        10       123        60
OIR    2025130    131400  -10.6300 -137.2300      41.3        10       124        60
OIR    2025130    131400  -10.6300 -137.2400      41.2        10       126        60
OIR    2025130    131400  -10.6300 -137.2500      40.7         9       127        60
OIR    2025130    131400  -10.6300 -137.2600      40.4         9       126        60
OIR    2025130    131400  -10.6300 -137.2700      40.2         9       120        60
OIR    2025130    131400  -10.6300 -137.2800      39.9         8       115        60
OIR    2025130    131400  -10.6300 -137.2900      39.5         8       116        60
OIR    2025130    131400  -10.6300 -137.3000      39.2         8       120        60
OIR    2025130    131400  -10.6300 -137.3100      38.8         7       124        60
OIR    2025130    131400  -10.6300 -137.3200      38.0         5       128        60
OIR    2025130    131400  -10.6300 -137.3300      37.6         3       132        60
OIR    2025130    131400  -10.6300 -137.3400      37.5         1       136        60
OIR    2025130    131400  -10.6300 -137.3500      37.5         0       140        60
OIR    2025130    131400  -10.6300 -137.3600      37.5         0       136        60
OIR    2025130    131400  -10.6300 -137.3700      37.5         0       132        60
OIR    2025130    131400  -10.6300 -137.3800      37.5         0       124        60
OIR    2025130    131400  -10.6300 -137.3900      37.5         0       116        60
OIR    2025130    131400  -10.6300 -137.4000      37.5         0       117        60
OIR    2025130    131400  -10.6300 -137.4100      37.5         0       120        60
OIR    2025130    131400  -10.6300 -137.4200      37.4         0       121        60
OIR    2025130    131400  -10.6300 -137.4300      37.4         0       122        60
OIR    2025130    131400  -10.6300 -137.4400      37.3       360       122        60
OIR    2025130    131400  -10.6300 -137.4500      37.1       359       122        60
OIR    2025130    131400  -10.6300 -137.4600      36.9       359       121        60
OIR    2025130    131400  -10.6300 -137.4700      36.7       359       119        60
OIR    2025130    131400  -10.6300 -137.4800      36.7       358       116        60
OIR    2025130    131400  -10.6300 -137.4900      36.7       358       116        60
OIR    2025130    131400  -10.6300 -137.5000      36.6       358       114        60
OIR    2025130    131400  -10.6300 -137.5100      36.6       358       112        60
OIR    2025130    131400  -10.6300 -137.5200      36.5       358       112        60
OIR    2025130    131400  -10.6300 -137.5300      36.4       358       114        60
OIR    2025130    131400  -10.6300 -137.5400      36.3       358       115        60
OIR    2025130    131400  -10.6300 -137.5500      36.0       358       115        60
OIR    2025130    131400  -10.6300 -137.5600      35.8       358       116        60
OIR    2025130    131400  -10.6300 -137.5700      35.5       358       116        60
OIR    2025130    131400  -10.6300 -137.5800      35.2       357       116        60
OIR    2025130    131400  -10.6300 -137.5900      34.9       357       116        60
OIR    2025130    131400  -10.6300 -137.6000      34.6       358       117        60
OIR    2025130    131400  -10.6300 -137.6100      34.4       358       119        60
OIR    2025130    131400  -10.6300 -137.6200      34.3       357       119        60
OIR    2025130    131400  -10.6300 -137.6300      34.2       357       117        60
OIR    2025130    131400  -10.6300 -137.6400      34.2       357       116        60
OIR    2025130    131400  -10.6300 -137.6500      34.2       357       115        60
OIR    2025130    131400  -10.6300 -137.6600      34.2       357       113        60
OIR    2025130    131400  -10.6300 -137.6700      34.2       357       111        60
OIR    2025130    131400  -10.6300 -137.6800      34.1       357       111        60
OIR    2025130    131400  -10.6300 -137.6900      34.0       357       112        60
OIR    2025130    131400  -10.6300 -137.7000      33.8       357       113        60
OIR    2025130    131400  -10.6300 -137.7100      33.6       358       115        60
OIR    2025130    131400  -10.6300 -137.7200      33.3       358       117        60
OIR    2025130    131400  -10.6300 -137.7300      33.0       358       119        60
OIR    2025130    131400  -10.6300 -137.7400      32.8       358       121        60
OIR    2025130    131400  -10.6300 -137.7500      32.5       358       122        60
OIR    2025130    131400  -10.6300 -137.7600      32.2       358       124        60
OIR    2025130    131400  -10.6300 -137.7700      32.0       358       125        60
OIR    2025130    131400  -10.6300 -137.7800      31.6       357       127        60
OIR    2025130    131400  -10.6300 -137.7900      31.0       357       129        60
OIR    2025130    131400  -10.6300 -137.8000      30.3       357       129        60
OIR    2025130    131400  -10.6300 -137.8100      29.6       357       128        60
OIR    2025130    131400  -10.6300 -137.8200      29.0       357       127        60
OIR    2025130    131400  -10.6300 -137.8300      28.5       357       127        60
OIR    2025130    131400  -10.6300 -137.8400      28.2       357       129        60
OIR    2025130    131400  -10.6300 -137.8500      27.9       357       131        60
OIR    2025130    131400  -10.6300 -137.8600      27.5       357       133        60
OIR    2025130    131400  -10.6300 -137.8700      27.1       357       132        60
OIR    2025130    131400  -10.6300 -137.8800      26.8       357       129        60
OIR    2025130    131400  -10.6300 -137.8900      26.7       357       128        60
OIR    2025130    131400  -10.6300 -137.9000      26.6       357       127        60
OIR    2025130    131400  -10.6300 -137.9100      26.6       357       126        60
OIR    2025130    131400  -10.6300 -137.9200      26.6       357       126        60
OIR    2025130    131400  -10.6300 -137.9300      26.6       357       127        60
OIR    2025130    131400  -10.6300 -137.9400      26.6       357       128        60
OIR    2025130    131400  -10.6300 -137.9500      26.6       357       128        60
OIR    2025130    131400  -10.6300 -137.9600      26.6       357       127        60
OIR    2025130    131400  -10.6300 -137.9700      26.6       357       127        60
OIR    2025130    131400  -10.6300 -137.9800      26.6       357       128        60
OIR    2025130    131400  -10.6300 -137.9900      26.6       357       129        60
OIR    2025130    131400  -10.6300 -138.0000      26.6       357       129        60
OIR    2025130    131400  -10.6300 -138.0100      26.6       357       129        60
OIR    2025130    131400  -10.6300 -138.0200      26.6       357       129        60
OIR    2025130    131400  -10.6300 -138.0300      26.6       357       128        60
OIR    2025130    131400  -10.6300 -138.0400      26.7       357       127        60
OIR    2025130    131400  -10.6300 -138.0500      26.7       357       127        60
OIR    2025130    131400  -10.6300 -138.0600      26.7       357       128        60
OIR    2025130    131400  -10.6300 -138.0700      26.8       357       130        60
OIR    2025130    131400  -10.6300 -138.0800      26.8       357       132        60
OIR    2025130    131400  -10.6300 -138.0900      26.9       358       133        60
OIR    2025130    131400  -10.6300 -138.1000      26.9       358       134        60
OIR    2025130    131400  -10.6300 -138.1100      26.9       358       133        60
OIR    2025130    131400  -10.6300 -138.1200      27.0       358       131        60
OIR    2025130    131400  -10.6300 -138.1300      27.0       358       131        60
OIR    2025130    131400  -10.6300 -138.1400      27.0       358       131        60
OIR    2025130    131400  -10.6300 -138.1500      27.0       358       132        60
OIR    2025130    131400  -10.6300 -138.1600      27.0       358       133        60
OIR    2025130    131400  -10.6300 -138.1700      27.0       358       135        60
OIR    2025130    131400  -10.6300 -138.1800      27.0       358       137        60
OIR    2025130    131400  -10.6300 -138.1900      27.1       358       139        60
OIR    2025130    131400  -10.6300 -138.2000      27.1       358       143        60
OIR    2025130    131400  -10.6300 -138.2100      27.1       358       149        60
OIR    2025130    131400  -10.6400 -136.6700      41.0        30       149        60
OIR    2025130    131400  -10.6400 -136.6800      41.0        29       148        60
OIR    2025130    131400  -10.6400 -136.6900      41.0        27       147        60
OIR    2025130    131400  -10.6400 -136.7000      41.0        26       145        60
OIR    2025130    131400  -10.6400 -136.7100      41.0        25       143        60
OIR    2025130    131400  -10.6400 -136.7200      41.0        24       139        60
OIR    2025130    131400  -10.6400 -136.7300      41.0        24       137        60
OIR    2025130    131400  -10.6400 -136.7400      41.0        24       136        60
OIR    2025130    131400  -10.6400 -136.7500      41.0        24       136        60
OIR    2025130    131400  -10.6400 -136.7600      41.0        24       136        60
OIR    2025130    131400  -10.6400 -136.7700      41.0        24       134        60
OIR    2025130    131400  -10.6400 -136.7800      40.9        24       131        60
OIR    2025130    131400  -10.6400 -136.7900      40.9        24       132        60
OIR    2025130    131400  -10.6400 -136.8000      40.8        24       132        60
OIR    2025130    131400  -10.6400 -136.8100      40.7        23       132        60
OIR    2025130    131400  -10.6400 -136.8200      40.6        23       131        60
OIR    2025130    131400  -10.6400 -136.8300      40.5        23       131        60
OIR    2025130    131400  -10.6400 -136.8400      40.4        23       130        60
OIR    2025130    131400  -10.6400 -136.8500      40.3        23       128        60
OIR    2025130    131400  -10.6400 -136.8600      40.2        23       127        60
OIR    2025130    131400  -10.6400 -136.8700      40.1        23       129        60
OIR    2025130    131400  -10.6400 -136.8800      40.0        22       128        60
OIR    2025130    131400  -10.6400 -136.8900      40.0        22       127        60
OIR    2025130    131400  -10.6400 -136.9000      40.2        21       129        60
OIR    2025130    131400  -10.6400 -136.9100      40.2        20       131        60
OIR    2025130    131400  -10.6400 -136.9200      40.2        20       129        60
OIR    2025130    131400  -10.6400 -136.9300      40.3        20       128        60
OIR    2025130    131400  -10.6400 -136.9400      40.3        20       127        60
OIR    2025130    131400  -10.6400 -136.9500      40.3        20       126        60
OIR    2025130    131400  -10.6400 -136.9600      40.3        19       126        60
OIR    2025130    131400  -10.6400 -136.9700      40.3        19       124        60
OIR    2025130    131400  -10.6400 -136.9800      40.4        19       120        60
OIR    2025130    131400  -10.6400 -136.9900      40.4        18       120        60
OIR    2025130    131400  -10.6400 -137.0000      40.4        18       121        60
OIR    2025130    131400  -10.6400 -137.0100      40.4        18       122        60
OIR    2025130    131400  -10.6400 -137.0200      40.4        18       123        60
OIR    2025130    131400  -10.6400 -137.0300      40.4        18       130        60
OIR    2025130    131400  -10.6400 -137.0400      40.4        18       134        60
OIR    2025130    131400  -10.6400 -137.0500      40.4        18       132        60
OIR    2025130    131400  -10.6400 -137.0600      40.4        18       130        60
OIR    2025130    131400  -10.6400 -137.0700      40.4        18       129        60
OIR    2025130    131400  -10.6400 -137.0800      40.4        18       129        60
OIR    2025130    131400  -10.6400 -137.0900      40.4        18       130        60
OIR    2025130    131400  -10.6400 -137.1000      40.5        18       132        60
OIR    2025130    131400  -10.6400 -137.1100      40.5        18       135        60
OIR    2025130    131400  -10.6400 -137.1200      40.6        18       136        60
OIR    2025130    131400  -10.6400 -137.1300      40.8        17       138        60
OIR    2025130    131400  -10.6400 -137.1400      41.0        15       130        60
OIR    2025130    131400  -10.6400 -137.1500      41.2        15       124        60
OIR    2025130    131400  -10.6400 -137.1600      41.3        14       122        60
OIR    2025130    131400  -10.6400 -137.1700      41.4        12       121        60
OIR    2025130    131400  -10.6400 -137.1800      41.5        11       126        60
OIR    2025130    131400  -10.6400 -137.1900      41.6        11       129        60
OIR    2025130    131400  -10.6400 -137.2000      41.7        11       129        60
OIR    2025130    131400  -10.6400 -137.2100      41.7        11       128        60
OIR    2025130    131400  -10.6400 -137.2200      41.6        10       126        60
OIR    2025130    131400  -10.6400 -137.2300      41.5        10       126        60
OIR    2025130    131400  -10.6400 -137.2400      41.4        10       128        60
OIR    2025130    131400  -10.6400 -137.2500      41.1         9       129        60
OIR    2025130    131400  -10.6400 -137.2600      40.7         9       128        60
OIR    2025130    131400  -10.6400 -137.2700      40.2         8       123        60
OIR    2025130    131400  -10.6400 -137.2800      39.8         8       119        60
OIR    2025130    131400  -10.6400 -137.2900      39.4         8       120        60
OIR    2025130    131400  -10.6400 -137.3000      39.1         7       121        60
OIR    2025130    131400  -10.6400 -137.3100      38.9         7       123        60
OIR    2025130    131400  -10.6400 -137.3200      38.5         6       126        60
OIR    2025130    131400  -10.6400 -137.3300      37.8         4       131        60
OIR    2025130    131400  -10.6400 -137.3400      37.4         1       136        60
OIR    2025130    131400  -10.6400 -137.3500      37.5         0       141        60
OIR    2025130    131400  -10.6400 -137.3600      37.5         0       137        60
OIR    2025130    131400  -10.6400 -137.3700      37.5         0       133        60
OIR    2025130    131400  -10.6400 -137.3800      37.5         0       125        60
OIR    2025130    131400  -10.6400 -137.3900      37.5         0       117        60
OIR    2025130    131400  -10.6400 -137.4000      37.4         0       119        60
OIR    2025130    131400  -10.6400 -137.4100      37.4         0       120        60
OIR    2025130    131400  -10.6400 -137.4200      37.4         0       122        60
OIR    2025130    131400  -10.6400 -137.4300      37.4         0       122        60
OIR    2025130    131400  -10.6400 -137.4400      37.2       360       122        60
OIR    2025130    131400  -10.6400 -137.4500      37.0       359       122        60
OIR    2025130    131400  -10.6400 -137.4600      36.9       359       123        60
OIR    2025130    131400  -10.6400 -137.4700      36.8       358       121        60
OIR    2025130    131400  -10.6400 -137.4800      36.7       358       119        60
OIR    2025130    131400  -10.6400 -137.4900      36.7       358       116        60
OIR    2025130    131400  -10.6400 -137.5000      36.7       358       114        60
OIR    2025130    131400  -10.6400 -137.5100      36.6       358       113        60
OIR    2025130    131400  -10.6400 -137.5200      36.6       358       113        60
OIR    2025130    131400  -10.6400 -137.5300      36.5       358       116        60
OIR    2025130    131400  -10.6400 -137.5400      36.3       358       116        60
OIR    2025130    131400  -10.6400 -137.5500      36.1       358       116        60
OIR    2025130    131400  -10.6400 -137.5600      35.9       357       117        60
OIR    2025130    131400  -10.6400 -137.5700      35.7       357       117        60
OIR    2025130    131400  -10.6400 -137.5800      35.4       357       117        60
OIR    2025130    131400  -10.6400 -137.5900      35.1       357       117        60
OIR    2025130    131400  -10.6400 -137.6000      34.8       357       117        60
OIR    2025130    131400  -10.6400 -137.6100      34.7       357       119        60
OIR    2025130    131400  -10.6400 -137.6200      34.6       357       119        60
OIR    2025130    131400  -10.6400 -137.6300      34.5       357       117        60
OIR    2025130    131400  -10.6400 -137.6400      34.4       357       116        60
OIR    2025130    131400  -10.6400 -137.6500      34.3       357       115        60
OIR    2025130    131400  -10.6400 -137.6600      34.3       357       112        60
OIR    2025130    131400  -10.6400 -137.6700      34.2       357       111        60
OIR    2025130    131400  -10.6400 -137.6800      34.2       357       110        60
OIR    2025130    131400  -10.6400 -137.6900      34.0       357       112        60
OIR    2025130    131400  -10.6400 -137.7000      33.8       357       113        60
OIR    2025130    131400  -10.6400 -137.7100      33.6       357       116        60
OIR    2025130    131400  -10.6400 -137.7200      33.4       358       117        60
OIR    2025130    131400  -10.6400 -137.7300      33.1       358       119        60
OIR    2025130    131400  -10.6400 -137.7400      32.9       358       120        60
OIR    2025130    131400  -10.6400 -137.7500      32.7       358       121        60
OIR    2025130    131400  -10.6400 -137.7600      32.4       357       122        60
OIR    2025130    131400  -10.6400 -137.7700      32.2       357       123        60
OIR    2025130    131400  -10.6400 -137.7800      31.9       357       125        60
OIR    2025130    131400  -10.6400 -137.7900      31.4       357       127        60
OIR    2025130    131400  -10.6400 -137.8000      30.8       357       127        60
OIR    2025130    131400  -10.6400 -137.8100      30.1       357       126        60
OIR    2025130    131400  -10.6400 -137.8200      29.4       357       126        60
OIR    2025130    131400  -10.6400 -137.8300      28.8       357       127        60
OIR    2025130    131400  -10.6400 -137.8400      28.4       357       129        60
OIR    2025130    131400  -10.6400 -137.8500      28.1       357       131        60
OIR    2025130    131400  -10.6400 -137.8600      27.8       357       133        60
OIR    2025130    131400  -10.6400 -137.8700      27.3       357       133        60
OIR    2025130    131400  -10.6400 -137.8800      27.0       357       130        60
OIR    2025130    131400  -10.6400 -137.8900      26.8       357       128        60
OIR    2025130    131400  -10.6400 -137.9000      26.7       357       127        60
OIR    2025130    131400  -10.6400 -137.9100      26.6       357       127        60
OIR    2025130    131400  -10.6400 -137.9200      26.6       357       128        60
OIR    2025130    131400  -10.6400 -137.9300      26.6       357       129        60
OIR    2025130    131400  -10.6400 -137.9400      26.6       357       130        60
OIR    2025130    131400  -10.6400 -137.9500      26.6       357       129        60
OIR    2025130    131400  -10.6400 -137.9600      26.6       357       129        60
OIR    2025130    131400  -10.6400 -137.9700      26.6       357       129        60
OIR    2025130    131400  -10.6400 -137.9800      26.6       357       130        60
OIR    2025130    131400  -10.6400 -137.9900      26.6       357       131        60
OIR    2025130    131400  -10.6400 -138.0000      26.6       357       131        60
OIR    2025130    131400  -10.6400 -138.0100      26.6       357       131        60
OIR    2025130    131400  -10.6400 -138.0200      26.6       357       131        60
OIR    2025130    131400  -10.6400 -138.0300      26.7       357       131        60
OIR    2025130    131400  -10.6400 -138.0400      26.7       357       130        60
OIR    2025130    131400  -10.6400 -138.0500      26.7       357       129        60
OIR    2025130    131400  -10.6400 -138.0600      26.7       357       130        60
OIR    2025130    131400  -10.6400 -138.0700      26.8       357       132        60
OIR    2025130    131400  -10.6400 -138.0800      26.8       357       134        60
OIR    2025130    131400  -10.6400 -138.0900      26.9       358       136        60
OIR    2025130    131400  -10.6400 -138.1000      26.9       358       136        60
OIR    2025130    131400  -10.6400 -138.1100      26.9       358       135        60
OIR    2025130    131400  -10.6400 -138.1200      27.0       358       134        60
OIR    2025130    131400  -10.6400 -138.1300      27.0       358       133        60
OIR    2025130    131400  -10.6400 -138.1400      27.0       358       133        60
OIR    2025130    131400  -10.6400 -138.1500      27.0       358       134        60
OIR    2025130    131400  -10.6400 -138.1600      27.0       358       135        60
OIR    2025130    131400  -10.6400 -138.1700      27.0       358       136        60
OIR    2025130    131400  -10.6400 -138.1800      27.0       358       137        60
OIR    2025130    131400  -10.6400 -138.1900      27.0       358       139        60
OIR    2025130    131400  -10.6400 -138.2000      27.1       358       143        60
OIR    2025130    131400  -10.6400 -138.2100      27.1       358       147        60
OIR    2025130    131400  -10.6400 -138.2200      27.1       358       149        60
OIR    2025130    131400  -10.6500 -136.6800      41.1        27       149        60
OIR    2025130    131400  -10.6500 -136.6900      41.1        25       147        60
OIR    2025130    131400  -10.6500 -136.7000      41.1        25       145        60
OIR    2025130    131400  -10.6500 -136.7100      41.1        24       144        60
OIR    2025130    131400  -10.6500 -136.7200      41.1        24       140        60
OIR    2025130    131400  -10.6500 -136.7300      41.0        24       139        60
OIR    2025130    131400  -10.6500 -136.7400      41.0        24       138        60
OIR    2025130    131400  -10.6500 -136.7500      41.0        24       137        60
OIR    2025130    131400  -10.6500 -136.7600      41.0        24       137        60
OIR    2025130    131400  -10.6500 -136.7700      41.0        24       133        60
OIR    2025130    131400  -10.6500 -136.7800      41.0        24       130        60
OIR    2025130    131400  -10.6500 -136.7900      40.9        23       131        60
OIR    2025130    131400  -10.6500 -136.8000      40.8        23       132        60
OIR    2025130    131400  -10.6500 -136.8100      40.7        23       132        60
OIR    2025130    131400  -10.6500 -136.8200      40.6        23       132        60
OIR    2025130    131400  -10.6500 -136.8300      40.5        23       131        60
OIR    2025130    131400  -10.6500 -136.8400      40.4        23       129        60
OIR    2025130    131400  -10.6500 -136.8500      40.3        23       127        60
OIR    2025130    131400  -10.6500 -136.8600      40.2        23       127        60
OIR    2025130    131400  -10.6500 -136.8700      40.1        22       130        60
OIR    2025130    131400  -10.6500 -136.8800      40.0        22       131        60
OIR    2025130    131400  -10.6500 -136.8900      40.1        21       131        60
OIR    2025130    131400  -10.6500 -136.9000      40.2        21       132        60
OIR    2025130    131400  -10.6500 -136.9100      40.3        20       133        60
OIR    2025130    131400  -10.6500 -136.9200      40.3        20       130        60
OIR    2025130    131400  -10.6500 -136.9300      40.3        20       127        60
OIR    2025130    131400  -10.6500 -136.9400      40.3        20       127        60
OIR    2025130    131400  -10.6500 -136.9500      40.3        19       126        60
OIR    2025130    131400  -10.6500 -136.9600      40.3        19       125        60
OIR    2025130    131400  -10.6500 -136.9700      40.3        19       123        60
OIR    2025130    131400  -10.6500 -136.9800      40.4        18       120        60
OIR    2025130    131400  -10.6500 -136.9900      40.4        18       119        60
OIR    2025130    131400  -10.6500 -137.0000      40.4        18       119        60
OIR    2025130    131400  -10.6500 -137.0100      40.4        18       120        60
OIR    2025130    131400  -10.6500 -137.0200      40.4        18       122        60
OIR    2025130    131400  -10.6500 -137.0300      40.4        18       128        60
OIR    2025130    131400  -10.6500 -137.0400      40.4        18       132        60
OIR    2025130    131400  -10.6500 -137.0500      40.4        18       132        60
OIR    2025130    131400  -10.6500 -137.0600      40.4        18       131        60
OIR    2025130    131400  -10.6500 -137.0700      40.4        18       129        60
OIR    2025130    131400  -10.6500 -137.0800      40.4        18       128        60
OIR    2025130    131400  -10.6500 -137.0900      40.4        18       129        60
OIR    2025130    131400  -10.6500 -137.1000      40.5        18       130        60
OIR    2025130    131400  -10.6500 -137.1100      40.5        18       132        60
OIR    2025130    131400  -10.6500 -137.1200      40.6        18       135        60
OIR    2025130    131400  -10.6500 -137.1300      40.8        17       139        60
OIR    2025130    131400  -10.6500 -137.1400      41.2        15       132        60
OIR    2025130    131400  -10.6500 -137.1500      41.3        15       126        60
OIR    2025130    131400  -10.6500 -137.1600      41.4        14       124        60
OIR    2025130    131400  -10.6500 -137.1700      41.5        12       123        60
OIR    2025130    131400  -10.6500 -137.1800      41.6        11       125        60
OIR    2025130    131400  -10.6500 -137.1900      41.7        11       126        60
OIR    2025130    131400  -10.6500 -137.2000      41.7        11       126        60
OIR    2025130    131400  -10.6500 -137.2100      41.7        11       125        60
OIR    2025130    131400  -10.6500 -137.2200      41.7        10       124        60
OIR    2025130    131400  -10.6500 -137.2300      41.6        10       125        60
OIR    2025130    131400  -10.6500 -137.2400      41.6        10       128        60
OIR    2025130    131400  -10.6500 -137.2500      41.4        10       129        60
OIR    2025130    131400  -10.6500 -137.2600      41.1         9       128        60
OIR    2025130    131400  -10.6500 -137.2700      40.4         8       126        60
OIR    2025130    131400  -10.6500 -137.2800      39.7         8       124        60
OIR    2025130    131400  -10.6500 -137.2900      39.4         7       123        60
OIR    2025130    131400  -10.6500 -137.3000      39.1         7       122        60
OIR    2025130    131400  -10.6500 -137.3100      38.9         6       121        60
OIR    2025130    131400  -10.6500 -137.3200      38.7         6       124        60
OIR    2025130    131400  -10.6500 -137.3300      37.9         4       128        60
OIR    2025130    131400  -10.6500 -137.3400      37.4         2       134        60
OIR    2025130    131400  -10.6500 -137.3500      37.4         1       142        60
OIR    2025130    131400  -10.6500 -137.3600      37.4         0       138        60
OIR    2025130    131400  -10.6500 -137.3700      37.4         0       134        60
OIR    2025130    131400  -10.6500 -137.3800      37.4         0       126        60
OIR    2025130    131400  -10.6500 -137.3900      37.4         0       119        60
OIR    2025130    131400  -10.6500 -137.4000      37.4         0       119        60
OIR    2025130    131400  -10.6500 -137.4100      37.4         0       120        60
OIR    2025130    131400  -10.6500 -137.4200      37.4         0       122        60
OIR    2025130    131400  -10.6500 -137.4300      37.3         0       123        60
OIR    2025130    131400  -10.6500 -137.4400      37.2       360       122        60
OIR    2025130    131400  -10.6500 -137.4500      37.0       359       122        60
OIR    2025130    131400  -10.6500 -137.4600      36.8       359       122        60
OIR    2025130    131400  -10.6500 -137.4700      36.8       358       120        60
OIR    2025130    131400  -10.6500 -137.4800      36.7       358       117        60
OIR    2025130    131400  -10.6500 -137.4900      36.7       358       115        60
OIR    2025130    131400  -10.6500 -137.5000      36.6       358       112        60
OIR    2025130    131400  -10.6500 -137.5100      36.6       357       113        60
OIR    2025130    131400  -10.6500 -137.5200      36.6       357       114        60
OIR    2025130    131400  -10.6500 -137.5300      36.5       357       116        60
OIR    2025130    131400  -10.6500 -137.5400      36.3       357       116        60
OIR    2025130    131400  -10.6500 -137.5500      36.2       357       119        60
OIR    2025130    131400  -10.6500 -137.5600      36.0       357       120        60
OIR    2025130    131400  -10.6500 -137.5700      35.9       357       120        60
OIR    2025130    131400  -10.6500 -137.5800      35.6       357       120        60
OIR    2025130    131400  -10.6500 -137.5900      35.4       357       120        60
OIR    2025130    131400  -10.6500 -137.6000      35.1       357       117        60
OIR    2025130    131400  -10.6500 -137.6100      35.0       357       117        60
OIR    2025130    131400  -10.6500 -137.6200      34.8       357       120        60
OIR    2025130    131400  -10.6500 -137.6300      34.7       357       120        60
OIR    2025130    131400  -10.6500 -137.6400      34.5       357       117        60
OIR    2025130    131400  -10.6500 -137.6500      34.4       357       116        60
OIR    2025130    131400  -10.6500 -137.6600      34.3       357       113        60
OIR    2025130    131400  -10.6500 -137.6700      34.3       357       112        60
OIR    2025130    131400  -10.6500 -137.6800      34.1       357       110        60
OIR    2025130    131400  -10.6500 -137.6900      34.0       357       112        60
OIR    2025130    131400  -10.6500 -137.7000      33.8       357       115        60
OIR    2025130    131400  -10.6500 -137.7100      33.6       357       116        60
OIR    2025130    131400  -10.6500 -137.7200      33.3       357       119        60
OIR    2025130    131400  -10.6500 -137.7300      33.2       357       120        60
OIR    2025130    131400  -10.6500 -137.7400      33.0       357       120        60
OIR    2025130    131400  -10.6500 -137.7500      32.8       357       119        60
OIR    2025130    131400  -10.6500 -137.7600      32.6       357       119        60
OIR    2025130    131400  -10.6500 -137.7700      32.3       357       120        60
OIR    2025130    131400  -10.6500 -137.7800      32.0       357       121        60
OIR    2025130    131400  -10.6500 -137.7900      31.6       357       122        60
OIR    2025130    131400  -10.6500 -137.8000      31.1       357       123        60
OIR    2025130    131400  -10.6500 -137.8100      30.4       357       123        60
OIR    2025130    131400  -10.6500 -137.8200      29.7       357       126        60
OIR    2025130    131400  -10.6500 -137.8300      29.0       357       130        60
OIR    2025130    131400  -10.6500 -137.8400      28.5       357       131        60
OIR    2025130    131400  -10.6500 -137.8500      28.2       357       132        60
OIR    2025130    131400  -10.6500 -137.8600      27.9       357       133        60
OIR    2025130    131400  -10.6500 -137.8700      27.5       357       133        60
OIR    2025130    131400  -10.6500 -137.8800      27.1       357       130        60
OIR    2025130    131400  -10.6500 -137.8900      26.9       357       128        60
OIR    2025130    131400  -10.6500 -137.9000      26.8       357       127        60
OIR    2025130    131400  -10.6500 -137.9100      26.7       357       127        60
OIR    2025130    131400  -10.6500 -137.9200      26.6       357       128        60
OIR    2025130    131400  -10.6500 -137.9300      26.6       357       129        60
OIR    2025130    131400  -10.6500 -137.9400      26.6       357       130        60
OIR    2025130    131400  -10.6500 -137.9500      26.6       357       130        60
OIR    2025130    131400  -10.6500 -137.9600      26.6       357       131        60
OIR    2025130    131400  -10.6500 -137.9700      26.6       357       132        60
OIR    2025130    131400  -10.6500 -137.9800      26.6       357       132        60
OIR    2025130    131400  -10.6500 -137.9900      26.6       357       132        60
OIR    2025130    131400  -10.6500 -138.0000      26.6       357       132        60
OIR    2025130    131400  -10.6500 -138.0100      26.6       357       131        60
OIR    2025130    131400  -10.6500 -138.0200      26.7       357       131        60
OIR    2025130    131400  -10.6500 -138.0300      26.7       357       133        60
OIR    2025130    131400  -10.6500 -138.0400      26.7       357       132        60
OIR    2025130    131400  -10.6500 -138.0500      26.7       357       132        60
OIR    2025130    131400  -10.6500 -138.0600      26.7       357       132        60
OIR    2025130    131400  -10.6500 -138.0700      26.8       357       133        60
OIR    2025130    131400  -10.6500 -138.0800      26.8       357       136        60
OIR    2025130    131400  -10.6500 -138.0900      26.9       358       138        60
OIR    2025130    131400  -10.6500 -138.1000      26.9       358       138        60
OIR    2025130    131400  -10.6500 -138.1100      26.9       358       137        60
OIR    2025130    131400  -10.6500 -138.1200      27.0       358       136        60
OIR    2025130    131400  -10.6500 -138.1300      27.0       358       135        60
OIR    2025130    131400  -10.6500 -138.1400      27.0       358       136        60
OIR    2025130    131400  -10.6500 -138.1500      27.0       358       136        60
OIR    2025130    131400  -10.6500 -138.1600      27.0       358       137        60
OIR    2025130    131400  -10.6500 -138.1700      27.0       358       136        60
OIR    2025130    131400  -10.6500 -138.1800      27.0       358       136        60
OIR    2025130    131400  -10.6500 -138.1900      27.0       358       139        60
OIR    2025130    131400  -10.6500 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.6500 -138.2100      27.1       358       144        60
OIR    2025130    131400  -10.6500 -138.2200      27.1       358       147        60
OIR    2025130    131400  -10.6500 -138.2300      27.1       358       149        60
OIR    2025130    131400  -10.6600 -135.0300      14.3        23       136        60
OIR    2025130    131400  -10.6600 -135.0400      14.5        22       135        60
OIR    2025130    131400  -10.6600 -136.5200      42.1        36       148        60
OIR    2025130    131400  -10.6600 -136.5300      42.1        36       148        60
OIR    2025130    131400  -10.6600 -136.5400      42.1        36       148        60
OIR    2025130    131400  -10.6600 -136.6800      41.2        25       149        60
OIR    2025130    131400  -10.6600 -136.6900      41.2        25       147        60
OIR    2025130    131400  -10.6600 -136.7000      41.1        24       146        60
OIR    2025130    131400  -10.6600 -136.7100      41.1        24       144        60
OIR    2025130    131400  -10.6600 -136.7200      41.1        24       141        60
OIR    2025130    131400  -10.6600 -136.7300      41.1        24       140        60
OIR    2025130    131400  -10.6600 -136.7400      41.1        24       139        60
OIR    2025130    131400  -10.6600 -136.7500      41.0        23       138        60
OIR    2025130    131400  -10.6600 -136.7600      41.0        23       137        60
OIR    2025130    131400  -10.6600 -136.7700      41.0        23       133        60
OIR    2025130    131400  -10.6600 -136.7800      41.0        23       130        60
OIR    2025130    131400  -10.6600 -136.7900      41.0        23       130        60
OIR    2025130    131400  -10.6600 -136.8000      40.9        23       131        60
OIR    2025130    131400  -10.6600 -136.8100      40.8        23       131        60
OIR    2025130    131400  -10.6600 -136.8200      40.7        23       130        60
OIR    2025130    131400  -10.6600 -136.8300      40.6        23       130        60
OIR    2025130    131400  -10.6600 -136.8400      40.5        23       128        60
OIR    2025130    131400  -10.6600 -136.8500      40.4        22       127        60
OIR    2025130    131400  -10.6600 -136.8600      40.3        22       127        60
OIR    2025130    131400  -10.6600 -136.8700      40.1        22       131        60
OIR    2025130    131400  -10.6600 -136.8800      40.1        21       132        60
OIR    2025130    131400  -10.6600 -136.8900      40.1        21       133        60
OIR    2025130    131400  -10.6600 -136.9000      40.3        20       133        60
OIR    2025130    131400  -10.6600 -136.9100      40.4        20       133        60
OIR    2025130    131400  -10.6600 -136.9200      40.4        20       129        60
OIR    2025130    131400  -10.6600 -136.9300      40.4        20       127        60
OIR    2025130    131400  -10.6600 -136.9400      40.4        19       127        60
OIR    2025130    131400  -10.6600 -136.9500      40.4        19       126        60
OIR    2025130    131400  -10.6600 -136.9600      40.4        19       124        60
OIR    2025130    131400  -10.6600 -136.9700      40.4        18       122        60
OIR    2025130    131400  -10.6600 -136.9800      40.4        18       119        60
OIR    2025130    131400  -10.6600 -136.9900      40.4        18       117        60
OIR    2025130    131400  -10.6600 -137.0000      40.4        18       117        60
OIR    2025130    131400  -10.6600 -137.0100      40.4        18       119        60
OIR    2025130    131400  -10.6600 -137.0200      40.4        18       120        60
OIR    2025130    131400  -10.6600 -137.0300      40.4        18       125        60
OIR    2025130    131400  -10.6600 -137.0400      40.4        18       129        60
OIR    2025130    131400  -10.6600 -137.0500      40.4        18       130        60
OIR    2025130    131400  -10.6600 -137.0600      40.4        18       131        60
OIR    2025130    131400  -10.6600 -137.0700      40.4        18       130        60
OIR    2025130    131400  -10.6600 -137.0800      40.4        18       129        60
OIR    2025130    131400  -10.6600 -137.0900      40.4        18       130        60
OIR    2025130    131400  -10.6600 -137.1000      40.5        18       131        60
OIR    2025130    131400  -10.6600 -137.1100      40.5        18       132        60
OIR    2025130    131400  -10.6600 -137.1200      40.6        18       136        60
OIR    2025130    131400  -10.6600 -137.1300      40.9        17       140        60
OIR    2025130    131400  -10.6600 -137.1400      41.3        15       133        60
OIR    2025130    131400  -10.6600 -137.1500      41.4        15       128        60
OIR    2025130    131400  -10.6600 -137.1600      41.4        14       127        60
OIR    2025130    131400  -10.6600 -137.1700      41.6        13       126        60
OIR    2025130    131400  -10.6600 -137.1800      41.7        12       126        60
OIR    2025130    131400  -10.6600 -137.1900      41.8        11       126        60
OIR    2025130    131400  -10.6600 -137.2000      41.8        11       124        60
OIR    2025130    131400  -10.6600 -137.2100      41.7        11       123        60
OIR    2025130    131400  -10.6600 -137.2200      41.7        10       122        60
OIR    2025130    131400  -10.6600 -137.2300      41.6        10       123        60
OIR    2025130    131400  -10.6600 -137.2400      41.6        10       125        60
OIR    2025130    131400  -10.6600 -137.2500      41.4        10       127        60
OIR    2025130    131400  -10.6600 -137.2600      41.2         9       128        60
OIR    2025130    131400  -10.6600 -137.2700      40.6         9       127        60
OIR    2025130    131400  -10.6600 -137.2800      39.8         7       126        60
OIR    2025130    131400  -10.6600 -137.2900      39.3         7       124        60
OIR    2025130    131400  -10.6600 -137.3000      39.0         6       122        60
OIR    2025130    131400  -10.6600 -137.3100      38.9         6       119        60
OIR    2025130    131400  -10.6600 -137.3200      38.7         5       121        60
OIR    2025130    131400  -10.6600 -137.3300      37.9         3       124        60
OIR    2025130    131400  -10.6600 -137.3400      37.7         3       131        60
OIR    2025130    131400  -10.6600 -137.3500      37.4         1       139        60
OIR    2025130    131400  -10.6600 -137.3600      37.4         0       136        60
OIR    2025130    131400  -10.6600 -137.3700      37.4         0       134        60
OIR    2025130    131400  -10.6600 -137.3800      37.4         0       126        60
OIR    2025130    131400  -10.6600 -137.3900      37.4         0       120        60
OIR    2025130    131400  -10.6600 -137.4000      37.4         0       120        60
OIR    2025130    131400  -10.6600 -137.4100      37.3         0       121        60
OIR    2025130    131400  -10.6600 -137.4200      37.3         0       123        60
OIR    2025130    131400  -10.6600 -137.4300      37.2         0       124        60
OIR    2025130    131400  -10.6600 -137.4400      37.1       359       122        60
OIR    2025130    131400  -10.6600 -137.4500      36.9       359       122        60
OIR    2025130    131400  -10.6600 -137.4600      36.8       358       121        60
OIR    2025130    131400  -10.6600 -137.4700      36.7       358       120        60
OIR    2025130    131400  -10.6600 -137.4800      36.7       358       119        60
OIR    2025130    131400  -10.6600 -137.4900      36.7       357       116        60
OIR    2025130    131400  -10.6600 -137.5000      36.6       357       113        60
OIR    2025130    131400  -10.6600 -137.5100      36.6       357       114        60
OIR    2025130    131400  -10.6600 -137.5200      36.6       357       115        60
OIR    2025130    131400  -10.6600 -137.5300      36.5       357       116        60
OIR    2025130    131400  -10.6600 -137.5400      36.5       357       117        60
OIR    2025130    131400  -10.6600 -137.5500      36.3       357       119        60
OIR    2025130    131400  -10.6600 -137.5600      36.2       357       120        60
OIR    2025130    131400  -10.6600 -137.5700      36.1       357       120        60
OIR    2025130    131400  -10.6600 -137.5800      35.9       356       120        60
OIR    2025130    131400  -10.6600 -137.5900      35.7       356       121        60
OIR    2025130    131400  -10.6600 -137.6000      35.5       356       119        60
OIR    2025130    131400  -10.6600 -137.6100      35.3       356       117        60
OIR    2025130    131400  -10.6600 -137.6200      35.2       356       120        60
OIR    2025130    131400  -10.6600 -137.6300      35.0       356       120        60
OIR    2025130    131400  -10.6600 -137.6400      34.8       356       117        60
OIR    2025130    131400  -10.6600 -137.6500      34.6       356       116        60
OIR    2025130    131400  -10.6600 -137.6600      34.4       357       114        60
OIR    2025130    131400  -10.6600 -137.6700      34.3       357       112        60
OIR    2025130    131400  -10.6600 -137.6800      34.1       357       111        60
OIR    2025130    131400  -10.6600 -137.6900      33.9       357       113        60
OIR    2025130    131400  -10.6600 -137.7000      33.7       357       114        60
OIR    2025130    131400  -10.6600 -137.7100      33.5       357       116        60
OIR    2025130    131400  -10.6600 -137.7200      33.3       357       120        60
OIR    2025130    131400  -10.6600 -137.7300      33.2       357       120        60
OIR    2025130    131400  -10.6600 -137.7400      33.1       357       119        60
OIR    2025130    131400  -10.6600 -137.7500      32.9       357       116        60
OIR    2025130    131400  -10.6600 -137.7600      32.7       357       116        60
OIR    2025130    131400  -10.6600 -137.7700      32.5       357       119        60
OIR    2025130    131400  -10.6600 -137.7800      32.2       357       120        60
OIR    2025130    131400  -10.6600 -137.7900      31.8       357       121        60
OIR    2025130    131400  -10.6600 -137.8000      31.3       357       122        60
OIR    2025130    131400  -10.6600 -137.8100      30.6       357       123        60
OIR    2025130    131400  -10.6600 -137.8200      29.9       357       126        60
OIR    2025130    131400  -10.6600 -137.8300      29.2       357       128        60
OIR    2025130    131400  -10.6600 -137.8400      28.7       357       130        60
OIR    2025130    131400  -10.6600 -137.8500      28.4       357       131        60
OIR    2025130    131400  -10.6600 -137.8600      28.0       356       131        60
OIR    2025130    131400  -10.6600 -137.8700      27.6       356       131        60
OIR    2025130    131400  -10.6600 -137.8800      27.2       356       129        60
OIR    2025130    131400  -10.6600 -137.8900      26.9       356       128        60
OIR    2025130    131400  -10.6600 -137.9000      26.8       357       127        60
OIR    2025130    131400  -10.6600 -137.9100      26.7       357       127        60
OIR    2025130    131400  -10.6600 -137.9200      26.7       357       128        60
OIR    2025130    131400  -10.6600 -137.9300      26.6       357       129        60
OIR    2025130    131400  -10.6600 -137.9400      26.6       357       130        60
OIR    2025130    131400  -10.6600 -137.9500      26.6       357       131        60
OIR    2025130    131400  -10.6600 -137.9600      26.6       357       132        60
OIR    2025130    131400  -10.6600 -137.9700      26.6       357       133        60
OIR    2025130    131400  -10.6600 -137.9800      26.6       357       134        60
OIR    2025130    131400  -10.6600 -137.9900      26.6       357       133        60
OIR    2025130    131400  -10.6600 -138.0000      26.6       357       133        60
OIR    2025130    131400  -10.6600 -138.0100      26.7       357       132        60
OIR    2025130    131400  -10.6600 -138.0200      26.7       357       132        60
OIR    2025130    131400  -10.6600 -138.0300      26.7       357       132        60
OIR    2025130    131400  -10.6600 -138.0400      26.7       357       132        60
OIR    2025130    131400  -10.6600 -138.0500      26.7       357       133        60
OIR    2025130    131400  -10.6600 -138.0600      26.7       357       134        60
OIR    2025130    131400  -10.6600 -138.0700      26.8       357       135        60
OIR    2025130    131400  -10.6600 -138.0800      26.8       357       138        60
OIR    2025130    131400  -10.6600 -138.0900      26.9       358       139        60
OIR    2025130    131400  -10.6600 -138.1000      26.9       358       140        60
OIR    2025130    131400  -10.6600 -138.1100      26.9       358       139        60
OIR    2025130    131400  -10.6600 -138.1200      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1300      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1400      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1500      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1600      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1700      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1800      27.0       358       137        60
OIR    2025130    131400  -10.6600 -138.1900      27.0       358       139        60
OIR    2025130    131400  -10.6600 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.6600 -138.2100      27.0       358       143        60
OIR    2025130    131400  -10.6600 -138.2200      27.1       358       144        60
OIR    2025130    131400  -10.6600 -138.2300      27.1       358       145        60
OIR    2025130    131400  -10.6600 -138.2400      27.1       358       148        60
OIR    2025130    131400  -10.6700 -136.6500      41.5        30       149        60
OIR    2025130    131400  -10.6700 -136.6600      41.4        27       149        60
OIR    2025130    131400  -10.6700 -136.6700      41.4        25       149        60
OIR    2025130    131400  -10.6700 -136.6800      41.4        24       149        60
OIR    2025130    131400  -10.6700 -136.6900      41.2        24       148        60
OIR    2025130    131400  -10.6700 -136.7000      41.2        24       145        60
OIR    2025130    131400  -10.6700 -136.7100      41.2        24       143        60
OIR    2025130    131400  -10.6700 -136.7200      41.2        23       142        60
OIR    2025130    131400  -10.6700 -136.7300      41.2        23       141        60
OIR    2025130    131400  -10.6700 -136.7400      41.2        23       140        60
OIR    2025130    131400  -10.6700 -136.7500      41.1        23       138        60
OIR    2025130    131400  -10.6700 -136.7600      41.1        23       137        60
OIR    2025130    131400  -10.6700 -136.7700      41.1        23       134        60
OIR    2025130    131400  -10.6700 -136.7800      41.0        23       131        60
OIR    2025130    131400  -10.6700 -136.7900      41.0        23       130        60
OIR    2025130    131400  -10.6700 -136.8000      41.0        22       129        60
OIR    2025130    131400  -10.6700 -136.8100      40.9        22       129        60
OIR    2025130    131400  -10.6700 -136.8200      40.7        22       128        60
OIR    2025130    131400  -10.6700 -136.8300      40.7        22       129        60
OIR    2025130    131400  -10.6700 -136.8400      40.6        22       128        60
OIR    2025130    131400  -10.6700 -136.8500      40.6        21       127        60
OIR    2025130    131400  -10.6700 -136.8600      40.5        21       128        60
OIR    2025130    131400  -10.6700 -136.8700      40.4        21       131        60
OIR    2025130    131400  -10.6700 -136.8800      40.3        21       132        60
OIR    2025130    131400  -10.6700 -136.8900      40.3        20       132        60
OIR    2025130    131400  -10.6700 -136.9000      40.4        20       133        60
OIR    2025130    131400  -10.6700 -136.9100      40.5        20       133        60
OIR    2025130    131400  -10.6700 -136.9200      40.5        20       129        60
OIR    2025130    131400  -10.6700 -136.9300      40.5        19       125        60
OIR    2025130    131400  -10.6700 -136.9400      40.5        19       126        60
OIR    2025130    131400  -10.6700 -136.9500      40.4        19       125        60
OIR    2025130    131400  -10.6700 -136.9600      40.4        18       124        60
OIR    2025130    131400  -10.6700 -136.9700      40.4        18       121        60
OIR    2025130    131400  -10.6700 -136.9800      40.4        18       117        60
OIR    2025130    131400  -10.6700 -136.9900      40.4        18       116        60
OIR    2025130    131400  -10.6700 -137.0000      40.4        18       116        60
OIR    2025130    131400  -10.6700 -137.0100      40.4        18       116        60
OIR    2025130    131400  -10.6700 -137.0200      40.4        18       117        60
OIR    2025130    131400  -10.6700 -137.0300      40.4        18       122        60
OIR    2025130    131400  -10.6700 -137.0400      40.4        18       125        60
OIR    2025130    131400  -10.6700 -137.0500      40.4        18       128        60
OIR    2025130    131400  -10.6700 -137.0600      40.4        18       131        60
OIR    2025130    131400  -10.6700 -137.0700      40.4        18       130        60
OIR    2025130    131400  -10.6700 -137.0800      40.4        18       131        60
OIR    2025130    131400  -10.6700 -137.0900      40.4        18       132        60
OIR    2025130    131400  -10.6700 -137.1000      40.5        18       133        60
OIR    2025130    131400  -10.6700 -137.1100      40.5        18       135        60
OIR    2025130    131400  -10.6700 -137.1200      40.6        18       137        60
OIR    2025130    131400  -10.6700 -137.1300      40.9        16       140        60
OIR    2025130    131400  -10.6700 -137.1400      41.3        15       135        60
OIR    2025130    131400  -10.6700 -137.1500      41.4        14       132        60
OIR    2025130    131400  -10.6700 -137.1600      41.4        13       131        60
OIR    2025130    131400  -10.6700 -137.1700      41.6        12       130        60
OIR    2025130    131400  -10.6700 -137.1800      41.7        12       129        60
OIR    2025130    131400  -10.6700 -137.1900      41.8        11       126        60
OIR    2025130    131400  -10.6700 -137.2000      41.8        11       122        60
OIR    2025130    131400  -10.6700 -137.2100      41.8        10       121        60
OIR    2025130    131400  -10.6700 -137.2200      41.6        10       121        60
OIR    2025130    131400  -10.6700 -137.2300      41.6        10       120        60
OIR    2025130    131400  -10.6700 -137.2400      41.5        10       119        60
OIR    2025130    131400  -10.6700 -137.2500      41.4         9       125        60
OIR    2025130    131400  -10.6700 -137.2600      41.2         9       128        60
OIR    2025130    131400  -10.6700 -137.2700      40.4         8       127        60
OIR    2025130    131400  -10.6700 -137.2800      39.9         7       126        60
OIR    2025130    131400  -10.6700 -137.2900      39.2         6       125        60
OIR    2025130    131400  -10.6700 -137.3000      38.8         5       122        60
OIR    2025130    131400  -10.6700 -137.3100      38.7         5       116        60
OIR    2025130    131400  -10.6700 -137.3200      38.5         5       117        60
OIR    2025130    131400  -10.6700 -137.3300      37.8         3       120        60
OIR    2025130    131400  -10.6700 -137.3400      37.8         3       125        60
OIR    2025130    131400  -10.6700 -137.3500      37.5         1       133        60
OIR    2025130    131400  -10.6700 -137.3600      37.4         1       133        60
OIR    2025130    131400  -10.6700 -137.3700      37.4         1       131        60
OIR    2025130    131400  -10.6700 -137.3800      37.4         1       125        60
OIR    2025130    131400  -10.6700 -137.3900      37.4         1       120        60
OIR    2025130    131400  -10.6700 -137.4000      37.3         0       121        60
OIR    2025130    131400  -10.6700 -137.4100      37.2         0       122        60
OIR    2025130    131400  -10.6700 -137.4200      37.2         0       124        60
OIR    2025130    131400  -10.6700 -137.4300      37.1       360       125        60
OIR    2025130    131400  -10.6700 -137.4400      36.9       359       124        60
OIR    2025130    131400  -10.6700 -137.4500      36.8       359       122        60
OIR    2025130    131400  -10.6700 -137.4600      36.8       358       121        60
OIR    2025130    131400  -10.6700 -137.4700      36.7       358       121        60
OIR    2025130    131400  -10.6700 -137.4800      36.7       357       121        60
OIR    2025130    131400  -10.6700 -137.4900      36.6       357       119        60
OIR    2025130    131400  -10.6700 -137.5000      36.6       357       116        60
OIR    2025130    131400  -10.6700 -137.5100      36.6       357       115        60
OIR    2025130    131400  -10.6700 -137.5200      36.6       357       116        60
OIR    2025130    131400  -10.6700 -137.5300      36.6       357       117        60
OIR    2025130    131400  -10.6700 -137.5400      36.5       357       119        60
OIR    2025130    131400  -10.6700 -137.5500      36.5       357       119        60
OIR    2025130    131400  -10.6700 -137.5600      36.4       356       119        60
OIR    2025130    131400  -10.6700 -137.5700      36.2       356       117        60
OIR    2025130    131400  -10.6700 -137.5800      36.1       356       119        60
OIR    2025130    131400  -10.6700 -137.5900      36.0       356       121        60
OIR    2025130    131400  -10.6700 -137.6000      35.9       356       120        60
OIR    2025130    131400  -10.6700 -137.6100      35.7       356       119        60
OIR    2025130    131400  -10.6700 -137.6200      35.5       356       119        60
OIR    2025130    131400  -10.6700 -137.6300      35.3       356       117        60
OIR    2025130    131400  -10.6700 -137.6400      35.1       356       117        60
OIR    2025130    131400  -10.6700 -137.6500      34.8       356       116        60
OIR    2025130    131400  -10.6700 -137.6600      34.6       356       116        60
OIR    2025130    131400  -10.6700 -137.6700      34.4       356       113        60
OIR    2025130    131400  -10.6700 -137.6800      34.2       356       111        60
OIR    2025130    131400  -10.6700 -137.6900      33.9       356       112        60
OIR    2025130    131400  -10.6700 -137.7000      33.8       357       113        60
OIR    2025130    131400  -10.6700 -137.7100      33.5       357       116        60
OIR    2025130    131400  -10.6700 -137.7200      33.3       357       119        60
OIR    2025130    131400  -10.6700 -137.7300      33.2       357       119        60
OIR    2025130    131400  -10.6700 -137.7400      33.1       357       117        60
OIR    2025130    131400  -10.6700 -137.7500      32.9       357       115        60
OIR    2025130    131400  -10.6700 -137.7600      32.8       357       115        60
OIR    2025130    131400  -10.6700 -137.7700      32.6       357       116        60
OIR    2025130    131400  -10.6700 -137.7800      32.3       357       119        60
OIR    2025130    131400  -10.6700 -137.7900      31.9       357       121        60
OIR    2025130    131400  -10.6700 -137.8000      31.4       356       122        60
OIR    2025130    131400  -10.6700 -137.8100      30.7       356       123        60
OIR    2025130    131400  -10.6700 -137.8200      30.1       356       125        60
OIR    2025130    131400  -10.6700 -137.8300      29.4       356       126        60
OIR    2025130    131400  -10.6700 -137.8400      28.9       356       129        60
OIR    2025130    131400  -10.6700 -137.8500      28.5       356       130        60
OIR    2025130    131400  -10.6700 -137.8600      28.1       356       130        60
OIR    2025130    131400  -10.6700 -137.8700      27.6       356       129        60
OIR    2025130    131400  -10.6700 -137.8800      27.2       356       128        60
OIR    2025130    131400  -10.6700 -137.8900      27.0       356       128        60
OIR    2025130    131400  -10.6700 -137.9000      26.9       356       128        60
OIR    2025130    131400  -10.6700 -137.9100      26.8       356       127        60
OIR    2025130    131400  -10.6700 -137.9200      26.7       357       127        60
OIR    2025130    131400  -10.6700 -137.9300      26.7       357       129        60
OIR    2025130    131400  -10.6700 -137.9400      26.7       357       130        60
OIR    2025130    131400  -10.6700 -137.9500      26.6       357       131        60
OIR    2025130    131400  -10.6700 -137.9600      26.6       357       133        60
OIR    2025130    131400  -10.6700 -137.9700      26.6       357       135        60
OIR    2025130    131400  -10.6700 -137.9800      26.6       357       135        60
OIR    2025130    131400  -10.6700 -137.9900      26.6       357       135        60
OIR    2025130    131400  -10.6700 -138.0000      26.6       357       134        60
OIR    2025130    131400  -10.6700 -138.0100      26.7       357       133        60
OIR    2025130    131400  -10.6700 -138.0200      26.7       357       132        60
OIR    2025130    131400  -10.6700 -138.0300      26.7       357       130        60
OIR    2025130    131400  -10.6700 -138.0400      26.7       357       132        60
OIR    2025130    131400  -10.6700 -138.0500      26.7       357       134        60
OIR    2025130    131400  -10.6700 -138.0600      26.7       357       136        60
OIR    2025130    131400  -10.6700 -138.0700      26.7       357       138        60
OIR    2025130    131400  -10.6700 -138.0800      26.8       357       139        60
OIR    2025130    131400  -10.6700 -138.0900      26.8       357       141        60
OIR    2025130    131400  -10.6700 -138.1000      26.9       358       141        60
OIR    2025130    131400  -10.6700 -138.1100      26.9       358       140        60
OIR    2025130    131400  -10.6700 -138.1200      27.0       358       139        60
OIR    2025130    131400  -10.6700 -138.1300      27.0       358       139        60
OIR    2025130    131400  -10.6700 -138.1400      27.0       358       139        60
OIR    2025130    131400  -10.6700 -138.1500      27.0       358       138        60
OIR    2025130    131400  -10.6700 -138.1600      27.0       358       138        60
OIR    2025130    131400  -10.6700 -138.1700      27.0       358       137        60
OIR    2025130    131400  -10.6700 -138.1800      27.0       358       137        60
OIR    2025130    131400  -10.6700 -138.1900      27.0       358       140        60
OIR    2025130    131400  -10.6700 -138.2000      27.0       358       141        60
OIR    2025130    131400  -10.6700 -138.2100      27.0       358       142        60
OIR    2025130    131400  -10.6700 -138.2200      27.0       358       142        60
OIR    2025130    131400  -10.6700 -138.2300      27.1       358       141        60
OIR    2025130    131400  -10.6700 -138.2400      27.1       358       143        60
OIR    2025130    131400  -10.6700 -138.2500      27.1       358       147        60
OIR    2025130    131400  -10.6700 -138.2600      27.1       358       149        60
OIR    2025130    131400  -10.6700 -138.2800      27.1       358       149        60
OIR    2025130    131400  -10.6700 -138.2900      27.1       358       149        60
OIR    2025130    131400  -10.6800 -136.6500      41.6        28       149        60
OIR    2025130    131400  -10.6800 -136.6600      41.6        26       148        60
OIR    2025130    131400  -10.6800 -136.6700      41.5        25       147        60
OIR    2025130    131400  -10.6800 -136.6800      41.5        24       147        60
OIR    2025130    131400  -10.6800 -136.6900      41.3        23       147        60
OIR    2025130    131400  -10.6800 -136.7000      41.3        23       145        60
OIR    2025130    131400  -10.6800 -136.7100      41.2        23       143        60
OIR    2025130    131400  -10.6800 -136.7200      41.2        23       144        60
OIR    2025130    131400  -10.6800 -136.7300      41.3        22       142        60
OIR    2025130    131400  -10.6800 -136.7400      41.3        22       140        60
OIR    2025130    131400  -10.6800 -136.7500      41.3        22       139        60
OIR    2025130    131400  -10.6800 -136.7600      41.2        22       138        60
OIR    2025130    131400  -10.6800 -136.7700      41.2        22       135        60
OIR    2025130    131400  -10.6800 -136.7800      41.1        22       133        60
OIR    2025130    131400  -10.6800 -136.7900      41.0        22       131        60
OIR    2025130    131400  -10.6800 -136.8000      41.0        21       130        60
OIR    2025130    131400  -10.6800 -136.8100      40.9        21       129        60
OIR    2025130    131400  -10.6800 -136.8200      40.8        21       129        60
OIR    2025130    131400  -10.6800 -136.8300      40.7        21       128        60
OIR    2025130    131400  -10.6800 -136.8400      40.7        21       128        60
OIR    2025130    131400  -10.6800 -136.8500      40.8        20       127        60
OIR    2025130    131400  -10.6800 -136.8600      40.8        20       127        60
OIR    2025130    131400  -10.6800 -136.8700      40.7        20       129        60
OIR    2025130    131400  -10.6800 -136.8800      40.7        20       129        60
OIR    2025130    131400  -10.6800 -136.8900      40.6        20       130        60
OIR    2025130    131400  -10.6800 -136.9000      40.6        20       130        60
OIR    2025130    131400  -10.6800 -136.9100      40.6        19       130        60
OIR    2025130    131400  -10.6800 -136.9200      40.6        19       126        60
OIR    2025130    131400  -10.6800 -136.9300      40.5        19       124        60
OIR    2025130    131400  -10.6800 -136.9400      40.5        19       123        60
OIR    2025130    131400  -10.6800 -136.9500      40.4        19       122        60
OIR    2025130    131400  -10.6800 -136.9600      40.4        18       122        60
OIR    2025130    131400  -10.6800 -136.9700      40.4        18       120        60
OIR    2025130    131400  -10.6800 -136.9800      40.4        18       116        60
OIR    2025130    131400  -10.6800 -136.9900      40.4        18       115        60
OIR    2025130    131400  -10.6800 -137.0000      40.4        18       114        60
OIR    2025130    131400  -10.6800 -137.0100      40.4        18       115        60
OIR    2025130    131400  -10.6800 -137.0200      40.4        18       116        60
OIR    2025130    131400  -10.6800 -137.0300      40.4        18       120        60
OIR    2025130    131400  -10.6800 -137.0400      40.4        18       124        60
OIR    2025130    131400  -10.6800 -137.0500      40.4        18       127        60
OIR    2025130    131400  -10.6800 -137.0600      40.4        18       131        60
OIR    2025130    131400  -10.6800 -137.0700      40.4        18       132        60
OIR    2025130    131400  -10.6800 -137.0800      40.4        18       133        60
OIR    2025130    131400  -10.6800 -137.0900      40.4        18       133        60
OIR    2025130    131400  -10.6800 -137.1000      40.5        18       134        60
OIR    2025130    131400  -10.6800 -137.1100      40.5        18       135        60
OIR    2025130    131400  -10.6800 -137.1200      40.6        17       137        60
OIR    2025130    131400  -10.6800 -137.1300      40.9        16       139        60
OIR    2025130    131400  -10.6800 -137.1400      41.3        14       137        60
OIR    2025130    131400  -10.6800 -137.1500      41.4        13       135        60
OIR    2025130    131400  -10.6800 -137.1600      41.4        13       134        60
OIR    2025130    131400  -10.6800 -137.1700      41.5        12       132        60
OIR    2025130    131400  -10.6800 -137.1800      41.6        12       132        60
OIR    2025130    131400  -10.6800 -137.1900      41.8        11       129        60
OIR    2025130    131400  -10.6800 -137.2000      41.8        11       122        60
OIR    2025130    131400  -10.6800 -137.2100      41.7        10       122        60
OIR    2025130    131400  -10.6800 -137.2200      41.7        10       123        60
OIR    2025130    131400  -10.6800 -137.2300      41.6        10       121        60
OIR    2025130    131400  -10.6800 -137.2400      41.5        10       116        60
OIR    2025130    131400  -10.6800 -137.2500      41.3         9       122        60
OIR    2025130    131400  -10.6800 -137.2600      41.0         9       125        60
OIR    2025130    131400  -10.6800 -137.2700      40.4         8       126        60
OIR    2025130    131400  -10.6800 -137.2800      39.8         7       126        60
OIR    2025130    131400  -10.6800 -137.2900      38.8         5       127        60
OIR    2025130    131400  -10.6800 -137.3000      38.4         4       124        60
OIR    2025130    131400  -10.6800 -137.3100      38.2         4       117        60
OIR    2025130    131400  -10.6800 -137.3200      38.0         4       116        60
OIR    2025130    131400  -10.6800 -137.3300      37.8         3       116        60
OIR    2025130    131400  -10.6800 -137.3400      37.7         3       120        60
OIR    2025130    131400  -10.6800 -137.3500      37.6         2       126        60
OIR    2025130    131400  -10.6800 -137.3600      37.5         1       127        60
OIR    2025130    131400  -10.6800 -137.3700      37.5         1       127        60
OIR    2025130    131400  -10.6800 -137.3800      37.4         1       124        60
OIR    2025130    131400  -10.6800 -137.3900      37.3         1       122        60
OIR    2025130    131400  -10.6800 -137.4000      37.2         1       122        60
OIR    2025130    131400  -10.6800 -137.4100      37.1         0       122        60
OIR    2025130    131400  -10.6800 -137.4200      37.1         0       124        60
OIR    2025130    131400  -10.6800 -137.4300      37.0       360       124        60
OIR    2025130    131400  -10.6800 -137.4400      36.8       359       125        60
OIR    2025130    131400  -10.6800 -137.4500      36.7       359       123        60
OIR    2025130    131400  -10.6800 -137.4600      36.7       358       121        60
OIR    2025130    131400  -10.6800 -137.4700      36.7       358       121        60
OIR    2025130    131400  -10.6800 -137.4800      36.7       357       120        60
OIR    2025130    131400  -10.6800 -137.4900      36.6       357       119        60
OIR    2025130    131400  -10.6800 -137.5000      36.6       357       117        60
OIR    2025130    131400  -10.6800 -137.5100      36.6       357       116        60
OIR    2025130    131400  -10.6800 -137.5200      36.6       357       116        60
OIR    2025130    131400  -10.6800 -137.5300      36.6       357       119        60
OIR    2025130    131400  -10.6800 -137.5400      36.6       357       121        60
OIR    2025130    131400  -10.6800 -137.5500      36.5       356       122        60
OIR    2025130    131400  -10.6800 -137.5600      36.4       356       121        60
OIR    2025130    131400  -10.6800 -137.5700      36.3       356       117        60
OIR    2025130    131400  -10.6800 -137.5800      36.2       356       119        60
OIR    2025130    131400  -10.6800 -137.5900      36.2       356       120        60
OIR    2025130    131400  -10.6800 -137.6000      36.1       356       117        60
OIR    2025130    131400  -10.6800 -137.6100      35.9       356       116        60
OIR    2025130    131400  -10.6800 -137.6200      35.8       356       116        60
OIR    2025130    131400  -10.6800 -137.6300      35.6       356       116        60
OIR    2025130    131400  -10.6800 -137.6400      35.4       356       116        60
OIR    2025130    131400  -10.6800 -137.6500      35.1       356       116        60
OIR    2025130    131400  -10.6800 -137.6600      34.8       356       116        60
OIR    2025130    131400  -10.6800 -137.6700      34.5       356       114        60
OIR    2025130    131400  -10.6800 -137.6800      34.2       356       113        60
OIR    2025130    131400  -10.6800 -137.6900      34.0       356       113        60
OIR    2025130    131400  -10.6800 -137.7000      33.7       356       113        60
OIR    2025130    131400  -10.6800 -137.7100      33.5       356       116        60
OIR    2025130    131400  -10.6800 -137.7200      33.3       357       119        60
OIR    2025130    131400  -10.6800 -137.7300      33.2       356       121        60
OIR    2025130    131400  -10.6800 -137.7400      33.1       356       121        60
OIR    2025130    131400  -10.6800 -137.7500      33.0       356       120        60
OIR    2025130    131400  -10.6800 -137.7600      32.8       356       119        60
OIR    2025130    131400  -10.6800 -137.7700      32.6       356       120        60
OIR    2025130    131400  -10.6800 -137.7800      32.3       356       121        60
OIR    2025130    131400  -10.6800 -137.7900      32.0       356       121        60
OIR    2025130    131400  -10.6800 -137.8000      31.4       356       122        60
OIR    2025130    131400  -10.6800 -137.8100      30.8       356       124        60
OIR    2025130    131400  -10.6800 -137.8200      30.2       356       125        60
OIR    2025130    131400  -10.6800 -137.8300      29.6       356       126        60
OIR    2025130    131400  -10.6800 -137.8400      29.0       356       129        60
OIR    2025130    131400  -10.6800 -137.8500      28.5       356       130        60
OIR    2025130    131400  -10.6800 -137.8600      28.1       356       129        60
OIR    2025130    131400  -10.6800 -137.8700      27.6       356       128        60
OIR    2025130    131400  -10.6800 -137.8800      27.2       356       127        60
OIR    2025130    131400  -10.6800 -137.8900      27.0       356       127        60
OIR    2025130    131400  -10.6800 -137.9000      26.9       356       126        60
OIR    2025130    131400  -10.6800 -137.9100      26.8       356       127        60
OIR    2025130    131400  -10.6800 -137.9200      26.7       356       127        60
OIR    2025130    131400  -10.6800 -137.9300      26.7       357       128        60
OIR    2025130    131400  -10.6800 -137.9400      26.7       357       130        60
OIR    2025130    131400  -10.6800 -137.9500      26.6       357       131        60
OIR    2025130    131400  -10.6800 -137.9600      26.6       357       132        60
OIR    2025130    131400  -10.6800 -137.9700      26.7       357       134        60
OIR    2025130    131400  -10.6800 -137.9800      26.7       357       135        60
OIR    2025130    131400  -10.6800 -137.9900      26.7       357       136        60
OIR    2025130    131400  -10.6800 -138.0000      26.7       357       136        60
OIR    2025130    131400  -10.6800 -138.0100      26.7       357       136        60
OIR    2025130    131400  -10.6800 -138.0200      26.7       357       134        60
OIR    2025130    131400  -10.6800 -138.0300      26.7       357       132        60
OIR    2025130    131400  -10.6800 -138.0400      26.7       357       133        60
OIR    2025130    131400  -10.6800 -138.0500      26.7       357       135        60
OIR    2025130    131400  -10.6800 -138.0600      26.7       357       136        60
OIR    2025130    131400  -10.6800 -138.0700      26.8       357       138        60
OIR    2025130    131400  -10.6800 -138.0800      26.8       357       140        60
OIR    2025130    131400  -10.6800 -138.0900      26.8       357       141        60
OIR    2025130    131400  -10.6800 -138.1000      26.9       357       142        60
OIR    2025130    131400  -10.6800 -138.1100      26.9       358       141        60
OIR    2025130    131400  -10.6800 -138.1200      26.9       358       140        60
OIR    2025130    131400  -10.6800 -138.1300      27.0       358       140        60
OIR    2025130    131400  -10.6800 -138.1400      27.0       358       140        60
OIR    2025130    131400  -10.6800 -138.1500      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.1600      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.1700      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.1800      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.1900      27.0       358       141        60
OIR    2025130    131400  -10.6800 -138.2000      27.0       358       141        60
OIR    2025130    131400  -10.6800 -138.2100      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.2200      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.2300      27.0       358       139        60
OIR    2025130    131400  -10.6800 -138.2400      27.1       358       141        60
OIR    2025130    131400  -10.6800 -138.2500      27.1       358       143        60
OIR    2025130    131400  -10.6800 -138.2600      27.1       358       144        60
OIR    2025130    131400  -10.6800 -138.2700      27.1       358       145        60
OIR    2025130    131400  -10.6800 -138.2800      27.1       358       146        60
OIR    2025130    131400  -10.6800 -138.2900      27.1       358       147        60
OIR    2025130    131400  -10.6900 -136.6500      41.6        26       149        60
OIR    2025130    131400  -10.6900 -136.6600      41.6        25       147        60
OIR    2025130    131400  -10.6900 -136.6700      41.6        24       146        60
OIR    2025130    131400  -10.6900 -136.6800      41.5        23       146        60
OIR    2025130    131400  -10.6900 -136.6900      41.4        23       145        60
OIR    2025130    131400  -10.6900 -136.7000      41.3        23       144        60
OIR    2025130    131400  -10.6900 -136.7100      41.3        22       144        60
OIR    2025130    131400  -10.6900 -136.7200      41.3        22       145        60
OIR    2025130    131400  -10.6900 -136.7300      41.4        22       143        60
OIR    2025130    131400  -10.6900 -136.7400      41.4        21       140        60
OIR    2025130    131400  -10.6900 -136.7500      41.3        21       139        60
OIR    2025130    131400  -10.6900 -136.7600      41.2        21       139        60
OIR    2025130    131400  -10.6900 -136.7700      41.2        21       137        60
OIR    2025130    131400  -10.6900 -136.7800      41.1        21       135        60
OIR    2025130    131400  -10.6900 -136.7900      41.1        21       134        60
OIR    2025130    131400  -10.6900 -136.8000      41.0        21       133        60
OIR    2025130    131400  -10.6900 -136.8100      40.9        21       131        60
OIR    2025130    131400  -10.6900 -136.8200      40.8        21       130        60
OIR    2025130    131400  -10.6900 -136.8300      40.8        20       129        60
OIR    2025130    131400  -10.6900 -136.8400      40.8        20       127        60
OIR    2025130    131400  -10.6900 -136.8500      40.8        20       125        60
OIR    2025130    131400  -10.6900 -136.8600      40.8        20       125        60
OIR    2025130    131400  -10.6900 -136.8700      40.7        20       125        60
OIR    2025130    131400  -10.6900 -136.8800      40.7        20       126        60
OIR    2025130    131400  -10.6900 -136.8900      40.7        20       127        60
OIR    2025130    131400  -10.6900 -136.9000      40.6        20       126        60
OIR    2025130    131400  -10.6900 -136.9100      40.6        19       125        60
OIR    2025130    131400  -10.6900 -136.9200      40.6        19       124        60
OIR    2025130    131400  -10.6900 -136.9300      40.6        19       122        60
OIR    2025130    131400  -10.6900 -136.9400      40.5        19       119        60
OIR    2025130    131400  -10.6900 -136.9500      40.4        18       119        60
OIR    2025130    131400  -10.6900 -136.9600      40.4        18       119        60
OIR    2025130    131400  -10.6900 -136.9700      40.4        18       117        60
OIR    2025130    131400  -10.6900 -136.9800      40.4        18       115        60
OIR    2025130    131400  -10.6900 -136.9900      40.4        18       113        60
OIR    2025130    131400  -10.6900 -137.0000      40.3        18       111        60
OIR    2025130    131400  -10.6900 -137.0100      40.3        18       114        60
OIR    2025130    131400  -10.6900 -137.0200      40.3        18       116        60
OIR    2025130    131400  -10.6900 -137.0300      40.3        18       121        60
OIR    2025130    131400  -10.6900 -137.0400      40.3        18       124        60
OIR    2025130    131400  -10.6900 -137.0500      40.4        18       127        60
OIR    2025130    131400  -10.6900 -137.0600      40.4        18       130        60
OIR    2025130    131400  -10.6900 -137.0700      40.4        18       133        60
OIR    2025130    131400  -10.6900 -137.0800      40.4        18       135        60
OIR    2025130    131400  -10.6900 -137.0900      40.4        18       133        60
OIR    2025130    131400  -10.6900 -137.1000      40.5        18       133        60
OIR    2025130    131400  -10.6900 -137.1100      40.5        17       133        60
OIR    2025130    131400  -10.6900 -137.1200      40.6        17       135        60
OIR    2025130    131400  -10.6900 -137.1300      41.0        15       138        60
OIR    2025130    131400  -10.6900 -137.1400      41.3        13       139        60
OIR    2025130    131400  -10.6900 -137.1500      41.4        13       138        60
OIR    2025130    131400  -10.6900 -137.1600      41.4        12       136        60
OIR    2025130    131400  -10.6900 -137.1700      41.5        12       135        60
OIR    2025130    131400  -10.6900 -137.1800      41.6        12       136        60
OIR    2025130    131400  -10.6900 -137.1900      41.7        11       132        60
OIR    2025130    131400  -10.6900 -137.2000      41.7        11       124        60
OIR    2025130    131400  -10.6900 -137.2100      41.6        10       125        60
OIR    2025130    131400  -10.6900 -137.2200      41.6        10       127        60
OIR    2025130    131400  -10.6900 -137.2300      41.5        10       123        60
OIR    2025130    131400  -10.6900 -137.2400      41.4        10       116        60
OIR    2025130    131400  -10.6900 -137.2500      41.1         9       119        60
OIR    2025130    131400  -10.6900 -137.2600      40.9         9       120        60
OIR    2025130    131400  -10.6900 -137.2700      40.6         9       123        60
OIR    2025130    131400  -10.6900 -137.2800      39.9         7       126        60
OIR    2025130    131400  -10.6900 -137.2900      38.4         4       129        60
OIR    2025130    131400  -10.6900 -137.3000      38.1         4       128        60
OIR    2025130    131400  -10.6900 -137.3100      37.9         4       122        60
OIR    2025130    131400  -10.6900 -137.3200      37.8         4       117        60
OIR    2025130    131400  -10.6900 -137.3300      37.7         3       114        60
OIR    2025130    131400  -10.6900 -137.3400      37.7         3       115        60
OIR    2025130    131400  -10.6900 -137.3500      37.6         3       119        60
OIR    2025130    131400  -10.6900 -137.3600      37.6         2       119        60
OIR    2025130    131400  -10.6900 -137.3700      37.6         2       121        60
OIR    2025130    131400  -10.6900 -137.3800      37.5         1       124        60
OIR    2025130    131400  -10.6900 -137.3900      37.2         1       126        60
OIR    2025130    131400  -10.6900 -137.4000      37.1         1       122        60
OIR    2025130    131400  -10.6900 -137.4100      36.9         1       121        60
OIR    2025130    131400  -10.6900 -137.4200      36.9         0       122        60
OIR    2025130    131400  -10.6900 -137.4300      36.8       360       124        60
OIR    2025130    131400  -10.6900 -137.4400      36.6       359       126        60
OIR    2025130    131400  -10.6900 -137.4500      36.6       358       124        60
OIR    2025130    131400  -10.6900 -137.4600      36.6       358       121        60
OIR    2025130    131400  -10.6900 -137.4700      36.6       358       120        60
OIR    2025130    131400  -10.6900 -137.4800      36.6       357       119        60
OIR    2025130    131400  -10.6900 -137.4900      36.6       357       119        60
OIR    2025130    131400  -10.6900 -137.5000      36.6       357       119        60
OIR    2025130    131400  -10.6900 -137.5100      36.6       357       119        60
OIR    2025130    131400  -10.6900 -137.5200      36.6       357       119        60
OIR    2025130    131400  -10.6900 -137.5300      36.6       357       121        60
OIR    2025130    131400  -10.6900 -137.5400      36.6       356       122        60
OIR    2025130    131400  -10.6900 -137.5500      36.5       356       125        60
OIR    2025130    131400  -10.6900 -137.5600      36.5       356       123        60
OIR    2025130    131400  -10.6900 -137.5700      36.4       356       119        60
OIR    2025130    131400  -10.6900 -137.5800      36.3       356       119        60
OIR    2025130    131400  -10.6900 -137.5900      36.2       356       120        60
OIR    2025130    131400  -10.6900 -137.6000      36.1       356       116        60
OIR    2025130    131400  -10.6900 -137.6100      36.1       355       114        60
OIR    2025130    131400  -10.6900 -137.6200      36.0       355       115        60
OIR    2025130    131400  -10.6900 -137.6300      35.9       355       116        60
OIR    2025130    131400  -10.6900 -137.6400      35.8       355       116        60
OIR    2025130    131400  -10.6900 -137.6500      35.5       356       116        60
OIR    2025130    131400  -10.6900 -137.6600      35.2       356       115        60
OIR    2025130    131400  -10.6900 -137.6700      34.8       356       115        60
OIR    2025130    131400  -10.6900 -137.6800      34.3       356       115        60
OIR    2025130    131400  -10.6900 -137.6900      34.0       356       114        60
OIR    2025130    131400  -10.6900 -137.7000      33.7       356       113        60
OIR    2025130    131400  -10.6900 -137.7100      33.5       356       116        60
OIR    2025130    131400  -10.6900 -137.7200      33.3       356       119        60
OIR    2025130    131400  -10.6900 -137.7300      33.2       356       122        60
OIR    2025130    131400  -10.6900 -137.7400      33.1       356       124        60
OIR    2025130    131400  -10.6900 -137.7500      32.9       356       125        60
OIR    2025130    131400  -10.6900 -137.7600      32.8       356       125        60
OIR    2025130    131400  -10.6900 -137.7700      32.6       356       124        60
OIR    2025130    131400  -10.6900 -137.7800      32.4       356       123        60
OIR    2025130    131400  -10.6900 -137.7900      32.0       356       122        60
OIR    2025130    131400  -10.6900 -137.8000      31.5       356       123        60
OIR    2025130    131400  -10.6900 -137.8100      30.9       356       124        60
OIR    2025130    131400  -10.6900 -137.8200      30.4       356       125        60
OIR    2025130    131400  -10.6900 -137.8300      29.8       356       126        60
OIR    2025130    131400  -10.6900 -137.8400      29.2       356       130        60
OIR    2025130    131400  -10.6900 -137.8500      28.6       356       131        60
OIR    2025130    131400  -10.6900 -137.8600      28.0       356       129        60
OIR    2025130    131400  -10.6900 -137.8700      27.6       356       128        60
OIR    2025130    131400  -10.6900 -137.8800      27.2       356       126        60
OIR    2025130    131400  -10.6900 -137.8900      27.0       356       125        60
OIR    2025130    131400  -10.6900 -137.9000      26.9       356       125        60
OIR    2025130    131400  -10.6900 -137.9100      26.8       356       126        60
OIR    2025130    131400  -10.6900 -137.9200      26.8       356       127        60
OIR    2025130    131400  -10.6900 -137.9300      26.7       356       128        60
OIR    2025130    131400  -10.6900 -137.9400      26.7       357       130        60
OIR    2025130    131400  -10.6900 -137.9500      26.7       357       131        60
OIR    2025130    131400  -10.6900 -137.9600      26.7       357       132        60
OIR    2025130    131400  -10.6900 -137.9700      26.7       357       133        60
OIR    2025130    131400  -10.6900 -137.9800      26.7       357       135        60
OIR    2025130    131400  -10.6900 -137.9900      26.7       357       137        60
OIR    2025130    131400  -10.6900 -138.0000      26.7       357       138        60
OIR    2025130    131400  -10.6900 -138.0100      26.7       357       138        60
OIR    2025130    131400  -10.6900 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.6900 -138.0300      26.7       357       135        60
OIR    2025130    131400  -10.6900 -138.0400      26.7       357       135        60
OIR    2025130    131400  -10.6900 -138.0500      26.7       357       135        60
OIR    2025130    131400  -10.6900 -138.0600      26.7       357       137        60
OIR    2025130    131400  -10.6900 -138.0700      26.8       357       138        60
OIR    2025130    131400  -10.6900 -138.0800      26.8       357       140        60
OIR    2025130    131400  -10.6900 -138.0900      26.8       357       142        60
OIR    2025130    131400  -10.6900 -138.1000      26.8       357       143        60
OIR    2025130    131400  -10.6900 -138.1100      26.9       358       143        60
OIR    2025130    131400  -10.6900 -138.1200      26.9       358       141        60
OIR    2025130    131400  -10.6900 -138.1300      27.0       358       141        60
OIR    2025130    131400  -10.6900 -138.1400      27.0       358       140        60
OIR    2025130    131400  -10.6900 -138.1500      27.0       358       140        60
OIR    2025130    131400  -10.6900 -138.1600      27.0       358       140        60
OIR    2025130    131400  -10.6900 -138.1700      27.0       358       140        60
OIR    2025130    131400  -10.6900 -138.1800      27.0       358       141        60
OIR    2025130    131400  -10.6900 -138.1900      27.0       358       142        60
OIR    2025130    131400  -10.6900 -138.2000      27.0       358       141        60
OIR    2025130    131400  -10.6900 -138.2100      27.0       358       137        60
OIR    2025130    131400  -10.6900 -138.2200      27.0       358       136        60
OIR    2025130    131400  -10.6900 -138.2300      27.0       358       137        60
OIR    2025130    131400  -10.6900 -138.2400      27.0       358       138        60
OIR    2025130    131400  -10.6900 -138.2500      27.1       358       138        60
OIR    2025130    131400  -10.6900 -138.2600      27.1       358       139        60
OIR    2025130    131400  -10.6900 -138.2700      27.1       358       141        60
OIR    2025130    131400  -10.6900 -138.2800      27.0       358       143        60
OIR    2025130    131400  -10.6900 -138.2900      27.0       358       145        60
OIR    2025130    131400  -10.7000 -136.6600      41.6        24       148        60
OIR    2025130    131400  -10.7000 -136.6700      41.6        23       146        60
OIR    2025130    131400  -10.7000 -136.6800      41.5        23       146        60
OIR    2025130    131400  -10.7000 -136.6900      41.5        22       145        60
OIR    2025130    131400  -10.7000 -136.7000      41.5        22       143        60
OIR    2025130    131400  -10.7000 -136.7100      41.5        22       142        60
OIR    2025130    131400  -10.7000 -136.7200      41.5        21       143        60
OIR    2025130    131400  -10.7000 -136.7300      41.4        21       142        60
OIR    2025130    131400  -10.7000 -136.7400      41.4        21       139        60
OIR    2025130    131400  -10.7000 -136.7500      41.3        21       139        60
OIR    2025130    131400  -10.7000 -136.7600      41.3        21       140        60
OIR    2025130    131400  -10.7000 -136.7700      41.2        21       138        60
OIR    2025130    131400  -10.7000 -136.7800      41.1        21       135        60
OIR    2025130    131400  -10.7000 -136.7900      41.1        21       135        60
OIR    2025130    131400  -10.7000 -136.8000      41.0        20       134        60
OIR    2025130    131400  -10.7000 -136.8100      40.9        20       132        60
OIR    2025130    131400  -10.7000 -136.8200      40.9        20       131        60
OIR    2025130    131400  -10.7000 -136.8300      40.8        20       129        60
OIR    2025130    131400  -10.7000 -136.8400      40.8        20       127        60
OIR    2025130    131400  -10.7000 -136.8500      40.8        20       125        60
OIR    2025130    131400  -10.7000 -136.8600      40.8        20       124        60
OIR    2025130    131400  -10.7000 -136.8700      40.8        20       124        60
OIR    2025130    131400  -10.7000 -136.8800      40.7        20       126        60
OIR    2025130    131400  -10.7000 -136.8900      40.7        20       127        60
OIR    2025130    131400  -10.7000 -136.9000      40.6        19       125        60
OIR    2025130    131400  -10.7000 -136.9100      40.6        19       123        60
OIR    2025130    131400  -10.7000 -136.9200      40.6        19       120        60
OIR    2025130    131400  -10.7000 -136.9300      40.6        19       119        60
OIR    2025130    131400  -10.7000 -136.9400      40.6        19       120        60
OIR    2025130    131400  -10.7000 -136.9500      40.4        18       120        60
OIR    2025130    131400  -10.7000 -136.9600      40.4        18       120        60
OIR    2025130    131400  -10.7000 -136.9700      40.4        18       120        60
OIR    2025130    131400  -10.7000 -136.9800      40.4        18       119        60
OIR    2025130    131400  -10.7000 -136.9900      40.3        18       116        60
OIR    2025130    131400  -10.7000 -137.0000      40.3        18       115        60
OIR    2025130    131400  -10.7000 -137.0100      40.3        18       116        60
OIR    2025130    131400  -10.7000 -137.0200      40.3        18       116        60
OIR    2025130    131400  -10.7000 -137.0300      40.3        18       120        60
OIR    2025130    131400  -10.7000 -137.0400      40.3        18       123        60
OIR    2025130    131400  -10.7000 -137.0500      40.3        17       128        60
OIR    2025130    131400  -10.7000 -137.0600      40.3        17       133        60
OIR    2025130    131400  -10.7000 -137.0700      40.4        17       137        60
OIR    2025130    131400  -10.7000 -137.0800      40.4        17       138        60
OIR    2025130    131400  -10.7000 -137.0900      40.4        17       135        60
OIR    2025130    131400  -10.7000 -137.1000      40.5        17       135        60
OIR    2025130    131400  -10.7000 -137.1100      40.5        17       134        60
OIR    2025130    131400  -10.7000 -137.1200      40.6        17       136        60
OIR    2025130    131400  -10.7000 -137.1300      41.0        15       139        60
OIR    2025130    131400  -10.7000 -137.1400      41.4        13       139        60
OIR    2025130    131400  -10.7000 -137.1500      41.4        13       138        60
OIR    2025130    131400  -10.7000 -137.1600      41.5        12       138        60
OIR    2025130    131400  -10.7000 -137.1700      41.6        12       137        60
OIR    2025130    131400  -10.7000 -137.1800      41.7        11       136        60
OIR    2025130    131400  -10.7000 -137.1900      41.7        11       132        60
OIR    2025130    131400  -10.7000 -137.2000      41.7        11       125        60
OIR    2025130    131400  -10.7000 -137.2100      41.6        10       125        60
OIR    2025130    131400  -10.7000 -137.2200      41.5        10       127        60
OIR    2025130    131400  -10.7000 -137.2300      41.4        10       125        60
OIR    2025130    131400  -10.7000 -137.2400      41.3        10       121        60
OIR    2025130    131400  -10.7000 -137.2500      41.0        10       121        60
OIR    2025130    131400  -10.7000 -137.2600      40.9         9       122        60
OIR    2025130    131400  -10.7000 -137.2700      40.5         9       123        60
OIR    2025130    131400  -10.7000 -137.2800      38.9         6       124        60
OIR    2025130    131400  -10.7000 -137.2900      38.1         4       129        60
OIR    2025130    131400  -10.7000 -137.3000      37.9         4       128        60
OIR    2025130    131400  -10.7000 -137.3100      37.8         4       123        60
OIR    2025130    131400  -10.7000 -137.3200      37.8         4       119        60
OIR    2025130    131400  -10.7000 -137.3300      37.7         3       115        60
OIR    2025130    131400  -10.7000 -137.3400      37.6         3       115        60
OIR    2025130    131400  -10.7000 -137.3500      37.6         3       115        60
OIR    2025130    131400  -10.7000 -137.3600      37.6         3       116        60
OIR    2025130    131400  -10.7000 -137.3700      37.6         3       120        60
OIR    2025130    131400  -10.7000 -137.3800      37.5         2       122        60
OIR    2025130    131400  -10.7000 -137.3900      37.0         1       125        60
OIR    2025130    131400  -10.7000 -137.4000      36.9         1       124        60
OIR    2025130    131400  -10.7000 -137.4100      36.7         1       123        60
OIR    2025130    131400  -10.7000 -137.4200      36.7         0       122        60
OIR    2025130    131400  -10.7000 -137.4300      36.6         0       122        60
OIR    2025130    131400  -10.7000 -137.4400      36.5       359       123        60
OIR    2025130    131400  -10.7000 -137.4500      36.5       358       122        60
OIR    2025130    131400  -10.7000 -137.4600      36.5       358       120        60
OIR    2025130    131400  -10.7000 -137.4700      36.6       357       119        60
OIR    2025130    131400  -10.7000 -137.4800      36.6       357       119        60
OIR    2025130    131400  -10.7000 -137.4900      36.6       357       119        60
OIR    2025130    131400  -10.7000 -137.5000      36.6       357       120        60
OIR    2025130    131400  -10.7000 -137.5100      36.6       357       120        60
OIR    2025130    131400  -10.7000 -137.5200      36.6       357       120        60
OIR    2025130    131400  -10.7000 -137.5300      36.6       356       121        60
OIR    2025130    131400  -10.7000 -137.5400      36.6       356       122        60
OIR    2025130    131400  -10.7000 -137.5500      36.5       356       122        60
OIR    2025130    131400  -10.7000 -137.5600      36.5       356       121        60
OIR    2025130    131400  -10.7000 -137.5700      36.4       356       119        60
OIR    2025130    131400  -10.7000 -137.5800      36.3       356       119        60
OIR    2025130    131400  -10.7000 -137.5900      36.3       355       117        60
OIR    2025130    131400  -10.7000 -137.6000      36.2       355       116        60
OIR    2025130    131400  -10.7000 -137.6100      36.1       355       114        60
OIR    2025130    131400  -10.7000 -137.6200      36.1       355       116        60
OIR    2025130    131400  -10.7000 -137.6300      36.0       355       119        60
OIR    2025130    131400  -10.7000 -137.6400      35.9       355       121        60
OIR    2025130    131400  -10.7000 -137.6500      35.7       355       122        60
OIR    2025130    131400  -10.7000 -137.6600      35.3       355       120        60
OIR    2025130    131400  -10.7000 -137.6700      34.9       356       117        60
OIR    2025130    131400  -10.7000 -137.6800      34.4       356       116        60
OIR    2025130    131400  -10.7000 -137.6900      34.1       356       116        60
OIR    2025130    131400  -10.7000 -137.7000      33.8       356       116        60
OIR    2025130    131400  -10.7000 -137.7100      33.5       356       119        60
OIR    2025130    131400  -10.7000 -137.7200      33.3       356       122        60
OIR    2025130    131400  -10.7000 -137.7300      33.2       356       124        60
OIR    2025130    131400  -10.7000 -137.7400      33.1       356       125        60
OIR    2025130    131400  -10.7000 -137.7500      32.9       356       126        60
OIR    2025130    131400  -10.7000 -137.7600      32.8       356       127        60
OIR    2025130    131400  -10.7000 -137.7700      32.6       356       126        60
OIR    2025130    131400  -10.7000 -137.7800      32.4       356       125        60
OIR    2025130    131400  -10.7000 -137.7900      32.0       356       124        60
OIR    2025130    131400  -10.7000 -137.8000      31.6       356       124        60
OIR    2025130    131400  -10.7000 -137.8100      31.0       355       124        60
OIR    2025130    131400  -10.7000 -137.8200      30.5       355       125        60
OIR    2025130    131400  -10.7000 -137.8300      29.9       355       126        60
OIR    2025130    131400  -10.7000 -137.8400      29.2       355       128        60
OIR    2025130    131400  -10.7000 -137.8500      28.5       355       129        60
OIR    2025130    131400  -10.7000 -137.8600      28.0       355       128        60
OIR    2025130    131400  -10.7000 -137.8700      27.5       355       127        60
OIR    2025130    131400  -10.7000 -137.8800      27.2       355       126        60
OIR    2025130    131400  -10.7000 -137.8900      27.0       355       125        60
OIR    2025130    131400  -10.7000 -137.9000      26.9       356       124        60
OIR    2025130    131400  -10.7000 -137.9100      26.8       356       125        60
OIR    2025130    131400  -10.7000 -137.9200      26.8       356       126        60
OIR    2025130    131400  -10.7000 -137.9300      26.7       356       128        60
OIR    2025130    131400  -10.7000 -137.9400      26.7       356       129        60
OIR    2025130    131400  -10.7000 -137.9500      26.7       356       129        60
OIR    2025130    131400  -10.7000 -137.9600      26.7       357       131        60
OIR    2025130    131400  -10.7000 -137.9700      26.7       357       133        60
OIR    2025130    131400  -10.7000 -137.9800      26.7       357       135        60
OIR    2025130    131400  -10.7000 -137.9900      26.7       357       136        60
OIR    2025130    131400  -10.7000 -138.0000      26.7       357       137        60
OIR    2025130    131400  -10.7000 -138.0100      26.7       357       138        60
OIR    2025130    131400  -10.7000 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.7000 -138.0300      26.7       357       136        60
OIR    2025130    131400  -10.7000 -138.0400      26.7       357       136        60
OIR    2025130    131400  -10.7000 -138.0500      26.7       357       138        60
OIR    2025130    131400  -10.7000 -138.0600      26.7       357       140        60
OIR    2025130    131400  -10.7000 -138.0700      26.8       357       141        60
OIR    2025130    131400  -10.7000 -138.0800      26.8       357       141        60
OIR    2025130    131400  -10.7000 -138.0900      26.8       357       141        60
OIR    2025130    131400  -10.7000 -138.1000      26.8       357       142        60
OIR    2025130    131400  -10.7000 -138.1100      26.9       358       142        60
OIR    2025130    131400  -10.7000 -138.1200      26.9       358       142        60
OIR    2025130    131400  -10.7000 -138.1300      26.9       358       141        60
OIR    2025130    131400  -10.7000 -138.1400      27.0       358       141        60
OIR    2025130    131400  -10.7000 -138.1500      27.0       358       140        60
OIR    2025130    131400  -10.7000 -138.1600      27.0       358       140        60
OIR    2025130    131400  -10.7000 -138.1700      27.0       358       141        60
OIR    2025130    131400  -10.7000 -138.1800      27.0       358       141        60
OIR    2025130    131400  -10.7000 -138.1900      27.0       358       142        60
OIR    2025130    131400  -10.7000 -138.2000      27.0       358       141        60
OIR    2025130    131400  -10.7000 -138.2100      27.0       358       140        60
OIR    2025130    131400  -10.7000 -138.2200      27.0       358       138        60
OIR    2025130    131400  -10.7000 -138.2300      27.0       358       136        60
OIR    2025130    131400  -10.7000 -138.2400      27.0       358       136        60
OIR    2025130    131400  -10.7000 -138.2500      27.0       358       137        60
OIR    2025130    131400  -10.7000 -138.2600      27.0       358       138        60
OIR    2025130    131400  -10.7000 -138.2700      27.0       358       139        60
OIR    2025130    131400  -10.7000 -138.2800      27.0       358       140        60
OIR    2025130    131400  -10.7000 -138.2900      27.0       358       142        60
OIR    2025130    131400  -10.7000 -138.3000      27.0       358       146        60
OIR    2025130    131400  -10.7000 -138.3100      27.0       358       149        60
OIR    2025130    131400  -10.7100 -136.6600      41.7        23       148        60
OIR    2025130    131400  -10.7100 -136.6700      41.6        23       147        60
OIR    2025130    131400  -10.7100 -136.6800      41.6        22       146        60
OIR    2025130    131400  -10.7100 -136.6900      41.6        22       144        60
OIR    2025130    131400  -10.7100 -136.7000      41.5        21       142        60
OIR    2025130    131400  -10.7100 -136.7100      41.5        21       140        60
OIR    2025130    131400  -10.7100 -136.7200      41.5        21       140        60
OIR    2025130    131400  -10.7100 -136.7300      41.5        21       139        60
OIR    2025130    131400  -10.7100 -136.7400      41.4        21       138        60
OIR    2025130    131400  -10.7100 -136.7500      41.4        21       138        60
OIR    2025130    131400  -10.7100 -136.7600      41.3        21       140        60
OIR    2025130    131400  -10.7100 -136.7700      41.2        21       138        60
OIR    2025130    131400  -10.7100 -136.7800      41.2        20       135        60
OIR    2025130    131400  -10.7100 -136.7900      41.1        20       135        60
OIR    2025130    131400  -10.7100 -136.8000      41.0        20       135        60
OIR    2025130    131400  -10.7100 -136.8100      40.9        20       133        60
OIR    2025130    131400  -10.7100 -136.8200      40.9        20       131        60
OIR    2025130    131400  -10.7100 -136.8300      40.8        20       129        60
OIR    2025130    131400  -10.7100 -136.8400      40.8        20       128        60
OIR    2025130    131400  -10.7100 -136.8500      40.8        20       125        60
OIR    2025130    131400  -10.7100 -136.8600      40.8        20       124        60
OIR    2025130    131400  -10.7100 -136.8700      40.8        20       125        60
OIR    2025130    131400  -10.7100 -136.8800      40.7        20       126        60
OIR    2025130    131400  -10.7100 -136.8900      40.7        19       128        60
OIR    2025130    131400  -10.7100 -136.9000      40.6        19       125        60
OIR    2025130    131400  -10.7100 -136.9100      40.6        19       122        60
OIR    2025130    131400  -10.7100 -136.9200      40.6        19       117        60
OIR    2025130    131400  -10.7100 -136.9300      40.6        19       116        60
OIR    2025130    131400  -10.7100 -136.9400      40.5        19       121        60
OIR    2025130    131400  -10.7100 -136.9500      40.4        18       122        60
OIR    2025130    131400  -10.7100 -136.9600      40.4        18       122        60
OIR    2025130    131400  -10.7100 -136.9700      40.3        18       123        60
OIR    2025130    131400  -10.7100 -136.9800      40.3        18       124        60
OIR    2025130    131400  -10.7100 -136.9900      40.3        18       121        60
OIR    2025130    131400  -10.7100 -137.0000      40.3        18       119        60
OIR    2025130    131400  -10.7100 -137.0100      40.3        18       119        60
OIR    2025130    131400  -10.7100 -137.0200      40.3        18       117        60
OIR    2025130    131400  -10.7100 -137.0300      40.3        17       119        60
OIR    2025130    131400  -10.7100 -137.0400      40.3        17       122        60
OIR    2025130    131400  -10.7100 -137.0500      40.3        17       130        60
OIR    2025130    131400  -10.7100 -137.0600      40.3        17       136        60
OIR    2025130    131400  -10.7100 -137.0700      40.3        17       140        60
OIR    2025130    131400  -10.7100 -137.0800      40.4        17       141        60
OIR    2025130    131400  -10.7100 -137.0900      40.4        17       138        60
OIR    2025130    131400  -10.7100 -137.1000      40.4        17       137        60
OIR    2025130    131400  -10.7100 -137.1100      40.5        17       137        60
OIR    2025130    131400  -10.7100 -137.1200      40.7        16       138        60
OIR    2025130    131400  -10.7100 -137.1300      41.1        14       140        60
OIR    2025130    131400  -10.7100 -137.1400      41.3        13       138        60
OIR    2025130    131400  -10.7100 -137.1500      41.4        12       137        60
OIR    2025130    131400  -10.7100 -137.1600      41.5        12       139        60
OIR    2025130    131400  -10.7100 -137.1700      41.6        12       139        60
OIR    2025130    131400  -10.7100 -137.1800      41.7        11       136        60
OIR    2025130    131400  -10.7100 -137.1900      41.7        11       131        60
OIR    2025130    131400  -10.7100 -137.2000      41.6        11       125        60
OIR    2025130    131400  -10.7100 -137.2100      41.5        10       125        60
OIR    2025130    131400  -10.7100 -137.2200      41.5        10       127        60
OIR    2025130    131400  -10.7100 -137.2300      41.3        10       126        60
OIR    2025130    131400  -10.7100 -137.2400      41.1        10       125        60
OIR    2025130    131400  -10.7100 -137.2500      40.8        10       123        60
OIR    2025130    131400  -10.7100 -137.2600      40.7         9       122        60
OIR    2025130    131400  -10.7100 -137.2700      40.1         9       122        60
OIR    2025130    131400  -10.7100 -137.2800      38.5         5       122        60
OIR    2025130    131400  -10.7100 -137.2900      37.9         4       128        60
OIR    2025130    131400  -10.7100 -137.3000      37.8         4       128        60
OIR    2025130    131400  -10.7100 -137.3100      37.8         4       123        60
OIR    2025130    131400  -10.7100 -137.3200      37.7         4       120        60
OIR    2025130    131400  -10.7100 -137.3300      37.7         4       116        60
OIR    2025130    131400  -10.7100 -137.3400      37.7         4       114        60
OIR    2025130    131400  -10.7100 -137.3500      37.6         3       112        60
OIR    2025130    131400  -10.7100 -137.3600      37.6         3       115        60
OIR    2025130    131400  -10.7100 -137.3700      37.5         3       117        60
OIR    2025130    131400  -10.7100 -137.3800      37.3         3       121        60
OIR    2025130    131400  -10.7100 -137.3900      36.8         2       124        60
OIR    2025130    131400  -10.7100 -137.4000      36.6         1       125        60
OIR    2025130    131400  -10.7100 -137.4100      36.5         1       124        60
OIR    2025130    131400  -10.7100 -137.4200      36.4         1       121        60
OIR    2025130    131400  -10.7100 -137.4300      36.4         0       121        60
OIR    2025130    131400  -10.7100 -137.4400      36.3       359       121        60
OIR    2025130    131400  -10.7100 -137.4500      36.4       358       120        60
OIR    2025130    131400  -10.7100 -137.4600      36.5       358       117        60
OIR    2025130    131400  -10.7100 -137.4700      36.6       357       119        60
OIR    2025130    131400  -10.7100 -137.4800      36.6       357       119        60
OIR    2025130    131400  -10.7100 -137.4900      36.7       357       119        60
OIR    2025130    131400  -10.7100 -137.5000      36.7       357       120        60
OIR    2025130    131400  -10.7100 -137.5100      36.7       357       121        60
OIR    2025130    131400  -10.7100 -137.5200      36.7       356       121        60
OIR    2025130    131400  -10.7100 -137.5300      36.7       356       121        60
OIR    2025130    131400  -10.7100 -137.5400      36.6       356       121        60
OIR    2025130    131400  -10.7100 -137.5500      36.5       356       120        60
OIR    2025130    131400  -10.7100 -137.5600      36.5       356       119        60
OIR    2025130    131400  -10.7100 -137.5700      36.4       356       117        60
OIR    2025130    131400  -10.7100 -137.5800      36.3       355       117        60
OIR    2025130    131400  -10.7100 -137.5900      36.3       355       116        60
OIR    2025130    131400  -10.7100 -137.6000      36.2       355       116        60
OIR    2025130    131400  -10.7100 -137.6100      36.2       355       115        60
OIR    2025130    131400  -10.7100 -137.6200      36.1       355       119        60
OIR    2025130    131400  -10.7100 -137.6300      36.1       355       122        60
OIR    2025130    131400  -10.7100 -137.6400      35.9       355       125        60
OIR    2025130    131400  -10.7100 -137.6500      35.8       355       127        60
OIR    2025130    131400  -10.7100 -137.6600      35.4       355       125        60
OIR    2025130    131400  -10.7100 -137.6700      35.0       355       122        60
OIR    2025130    131400  -10.7100 -137.6800      34.5       355       119        60
OIR    2025130    131400  -10.7100 -137.6900      34.1       356       119        60
OIR    2025130    131400  -10.7100 -137.7000      33.8       356       117        60
OIR    2025130    131400  -10.7100 -137.7100      33.5       356       122        60
OIR    2025130    131400  -10.7100 -137.7200      33.3       356       125        60
OIR    2025130    131400  -10.7100 -137.7300      33.2       356       126        60
OIR    2025130    131400  -10.7100 -137.7400      33.1       356       127        60
OIR    2025130    131400  -10.7100 -137.7500      33.0       356       128        60
OIR    2025130    131400  -10.7100 -137.7600      32.8       356       129        60
OIR    2025130    131400  -10.7100 -137.7700      32.6       355       128        60
OIR    2025130    131400  -10.7100 -137.7800      32.4       355       127        60
OIR    2025130    131400  -10.7100 -137.7900      32.1       355       126        60
OIR    2025130    131400  -10.7100 -137.8000      31.7       355       125        60
OIR    2025130    131400  -10.7100 -137.8100      31.2       355       125        60
OIR    2025130    131400  -10.7100 -137.8200      30.6       355       125        60
OIR    2025130    131400  -10.7100 -137.8300      30.0       355       125        60
OIR    2025130    131400  -10.7100 -137.8400      29.2       355       126        60
OIR    2025130    131400  -10.7100 -137.8500      28.4       355       127        60
OIR    2025130    131400  -10.7100 -137.8600      27.8       355       127        60
OIR    2025130    131400  -10.7100 -137.8700      27.3       355       127        60
OIR    2025130    131400  -10.7100 -137.8800      27.1       355       126        60
OIR    2025130    131400  -10.7100 -137.8900      26.9       355       125        60
OIR    2025130    131400  -10.7100 -137.9000      26.9       355       123        60
OIR    2025130    131400  -10.7100 -137.9100      26.8       355       125        60
OIR    2025130    131400  -10.7100 -137.9200      26.8       356       126        60
OIR    2025130    131400  -10.7100 -137.9300      26.7       356       127        60
OIR    2025130    131400  -10.7100 -137.9400      26.7       356       128        60
OIR    2025130    131400  -10.7100 -137.9500      26.7       356       128        60
OIR    2025130    131400  -10.7100 -137.9600      26.7       356       130        60
OIR    2025130    131400  -10.7100 -137.9700      26.7       357       133        60
OIR    2025130    131400  -10.7100 -137.9800      26.7       357       135        60
OIR    2025130    131400  -10.7100 -137.9900      26.7       357       136        60
OIR    2025130    131400  -10.7100 -138.0000      26.7       357       136        60
OIR    2025130    131400  -10.7100 -138.0100      26.7       357       137        60
OIR    2025130    131400  -10.7100 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.7100 -138.0300      26.7       357       137        60
OIR    2025130    131400  -10.7100 -138.0400      26.7       357       138        60
OIR    2025130    131400  -10.7100 -138.0500      26.7       357       140        60
OIR    2025130    131400  -10.7100 -138.0600      26.7       357       142        60
OIR    2025130    131400  -10.7100 -138.0700      26.8       357       144        60
OIR    2025130    131400  -10.7100 -138.0800      26.8       357       142        60
OIR    2025130    131400  -10.7100 -138.0900      26.8       357       141        60
OIR    2025130    131400  -10.7100 -138.1000      26.8       357       141        60
OIR    2025130    131400  -10.7100 -138.1100      26.9       357       141        60
OIR    2025130    131400  -10.7100 -138.1200      26.9       358       142        60
OIR    2025130    131400  -10.7100 -138.1300      26.9       358       142        60
OIR    2025130    131400  -10.7100 -138.1400      26.9       358       141        60
OIR    2025130    131400  -10.7100 -138.1500      27.0       358       141        60
OIR    2025130    131400  -10.7100 -138.1600      27.0       358       141        60
OIR    2025130    131400  -10.7100 -138.1700      27.0       358       141        60
OIR    2025130    131400  -10.7100 -138.1800      27.0       358       141        60
OIR    2025130    131400  -10.7100 -138.1900      27.0       358       141        60
OIR    2025130    131400  -10.7100 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.7100 -138.2100      27.0       358       142        60
OIR    2025130    131400  -10.7100 -138.2200      27.0       358       139        60
OIR    2025130    131400  -10.7100 -138.2300      27.0       358       136        60
OIR    2025130    131400  -10.7100 -138.2400      27.0       358       136        60
OIR    2025130    131400  -10.7100 -138.2500      27.0       358       137        60
OIR    2025130    131400  -10.7100 -138.2600      27.0       358       137        60
OIR    2025130    131400  -10.7100 -138.2700      27.0       358       138        60
OIR    2025130    131400  -10.7100 -138.2800      27.0       358       139        60
OIR    2025130    131400  -10.7100 -138.2900      27.0       358       140        60
OIR    2025130    131400  -10.7100 -138.3000      27.0       358       143        60
OIR    2025130    131400  -10.7100 -138.3100      27.0       358       145        60
OIR    2025130    131400  -10.7100 -138.3200      27.0       358       147        60
OIR    2025130    131400  -10.7100 -138.3300      26.9       358       149        60
OIR    2025130    131400  -10.7200 -136.6600      41.7        23       149        60
OIR    2025130    131400  -10.7200 -136.6700      41.7        22       148        60
OIR    2025130    131400  -10.7200 -136.6800      41.6        22       145        60
OIR    2025130    131400  -10.7200 -136.6900      41.6        21       142        60
OIR    2025130    131400  -10.7200 -136.7000      41.6        21       141        60
OIR    2025130    131400  -10.7200 -136.7100      41.5        21       139        60
OIR    2025130    131400  -10.7200 -136.7200      41.5        21       138        60
OIR    2025130    131400  -10.7200 -136.7300      41.5        21       138        60
OIR    2025130    131400  -10.7200 -136.7400      41.4        21       137        60
OIR    2025130    131400  -10.7200 -136.7500      41.4        21       138        60
OIR    2025130    131400  -10.7200 -136.7600      41.3        20       140        60
OIR    2025130    131400  -10.7200 -136.7700      41.2        20       138        60
OIR    2025130    131400  -10.7200 -136.7800      41.2        20       135        60
OIR    2025130    131400  -10.7200 -136.7900      41.1        20       134        60
OIR    2025130    131400  -10.7200 -136.8000      41.0        20       134        60
OIR    2025130    131400  -10.7200 -136.8100      41.0        20       132        60
OIR    2025130    131400  -10.7200 -136.8200      40.9        20       131        60
OIR    2025130    131400  -10.7200 -136.8300      40.8        20       130        60
OIR    2025130    131400  -10.7200 -136.8400      40.8        20       129        60
OIR    2025130    131400  -10.7200 -136.8500      40.8        20       128        60
OIR    2025130    131400  -10.7200 -136.8600      40.8        20       127        60
OIR    2025130    131400  -10.7200 -136.8700      40.7        20       126        60
OIR    2025130    131400  -10.7200 -136.8800      40.7        20       125        60
OIR    2025130    131400  -10.7200 -136.8900      40.7        19       124        60
OIR    2025130    131400  -10.7200 -136.9000      40.6        19       124        60
OIR    2025130    131400  -10.7200 -136.9100      40.6        19       124        60
OIR    2025130    131400  -10.7200 -136.9200      40.6        19       121        60
OIR    2025130    131400  -10.7200 -136.9300      40.6        19       120        60
OIR    2025130    131400  -10.7200 -136.9400      40.5        19       122        60
OIR    2025130    131400  -10.7200 -136.9500      40.4        19       122        60
OIR    2025130    131400  -10.7200 -136.9600      40.4        18       121        60
OIR    2025130    131400  -10.7200 -136.9700      40.3        18       121        60
OIR    2025130    131400  -10.7200 -136.9800      40.3        18       123        60
OIR    2025130    131400  -10.7200 -136.9900      40.3        18       120        60
OIR    2025130    131400  -10.7200 -137.0000      40.3        18       116        60
OIR    2025130    131400  -10.7200 -137.0100      40.3        18       117        60
OIR    2025130    131400  -10.7200 -137.0200      40.3        18       119        60
OIR    2025130    131400  -10.7200 -137.0300      40.3        17       119        60
OIR    2025130    131400  -10.7200 -137.0400      40.3        17       122        60
OIR    2025130    131400  -10.7200 -137.0500      40.3        17       130        60
OIR    2025130    131400  -10.7200 -137.0600      40.3        17       135        60
OIR    2025130    131400  -10.7200 -137.0700      40.3        17       140        60
OIR    2025130    131400  -10.7200 -137.0800      40.3        17       141        60
OIR    2025130    131400  -10.7200 -137.0900      40.4        17       139        60
OIR    2025130    131400  -10.7200 -137.1000      40.4        17       138        60
OIR    2025130    131400  -10.7200 -137.1100      40.6        16       138        60
OIR    2025130    131400  -10.7200 -137.1200      40.8        15       138        60
OIR    2025130    131400  -10.7200 -137.1300      41.1        13       138        60
OIR    2025130    131400  -10.7200 -137.1400      41.3        13       137        60
OIR    2025130    131400  -10.7200 -137.1500      41.3        12       137        60
OIR    2025130    131400  -10.7200 -137.1600      41.4        12       137        60
OIR    2025130    131400  -10.7200 -137.1700      41.6        11       137        60
OIR    2025130    131400  -10.7200 -137.1800      41.6        11       133        60
OIR    2025130    131400  -10.7200 -137.1900      41.6        10       128        60
OIR    2025130    131400  -10.7200 -137.2000      41.6        10       122        60
OIR    2025130    131400  -10.7200 -137.2100      41.5        10       121        60
OIR    2025130    131400  -10.7200 -137.2200      41.4        10       121        60
OIR    2025130    131400  -10.7200 -137.2300      41.4        10       120        60
OIR    2025130    131400  -10.7200 -137.2400      41.1        10       119        60
OIR    2025130    131400  -10.7200 -137.2500      40.7         9       117        60
OIR    2025130    131400  -10.7200 -137.2600      40.5         9       117        60
OIR    2025130    131400  -10.7200 -137.2700      39.9         8       117        60
OIR    2025130    131400  -10.7200 -137.2800      38.6         6       119        60
OIR    2025130    131400  -10.7200 -137.2900      38.0         4       122        60
OIR    2025130    131400  -10.7200 -137.3000      37.8         4       122        60
OIR    2025130    131400  -10.7200 -137.3100      37.8         4       117        60
OIR    2025130    131400  -10.7200 -137.3200      37.7         4       116        60
OIR    2025130    131400  -10.7200 -137.3300      37.7         4       114        60
OIR    2025130    131400  -10.7200 -137.3400      37.7         4       112        60
OIR    2025130    131400  -10.7200 -137.3500      37.6         4       110        60
OIR    2025130    131400  -10.7200 -137.3600      37.5         3       114        60
OIR    2025130    131400  -10.7200 -137.3700      37.4         3       116        60
OIR    2025130    131400  -10.7200 -137.3800      37.2         3       119        60
OIR    2025130    131400  -10.7200 -137.3900      36.7         2       121        60
OIR    2025130    131400  -10.7200 -137.4000      36.4         2       120        60
OIR    2025130    131400  -10.7200 -137.4100      36.3         1       119        60
OIR    2025130    131400  -10.7200 -137.4200      36.3         1       116        60
OIR    2025130    131400  -10.7200 -137.4300      36.2         0       115        60
OIR    2025130    131400  -10.7200 -137.4400      36.2       359       115        60
OIR    2025130    131400  -10.7200 -137.4500      36.3       358       116        60
OIR    2025130    131400  -10.7200 -137.4600      36.4       358       116        60
OIR    2025130    131400  -10.7200 -137.4700      36.6       357       117        60
OIR    2025130    131400  -10.7200 -137.4800      36.6       357       119        60
OIR    2025130    131400  -10.7200 -137.4900      36.7       357       119        60
OIR    2025130    131400  -10.7200 -137.5000      36.7       357       119        60
OIR    2025130    131400  -10.7200 -137.5100      36.7       356       119        60
OIR    2025130    131400  -10.7200 -137.5200      36.7       356       119        60
OIR    2025130    131400  -10.7200 -137.5300      36.7       356       119        60
OIR    2025130    131400  -10.7200 -137.5400      36.6       356       119        60
OIR    2025130    131400  -10.7200 -137.5500      36.5       356       120        60
OIR    2025130    131400  -10.7200 -137.5600      36.5       356       117        60
OIR    2025130    131400  -10.7200 -137.5700      36.4       355       116        60
OIR    2025130    131400  -10.7200 -137.5800      36.3       355       116        60
OIR    2025130    131400  -10.7200 -137.5900      36.3       355       116        60
OIR    2025130    131400  -10.7200 -137.6000      36.2       355       116        60
OIR    2025130    131400  -10.7200 -137.6100      36.2       355       116        60
OIR    2025130    131400  -10.7200 -137.6200      36.2       355       120        60
OIR    2025130    131400  -10.7200 -137.6300      36.1       355       124        60
OIR    2025130    131400  -10.7200 -137.6400      36.0       355       128        60
OIR    2025130    131400  -10.7200 -137.6500      35.8       355       129        60
OIR    2025130    131400  -10.7200 -137.6600      35.5       355       128        60
OIR    2025130    131400  -10.7200 -137.6700      35.1       355       125        60
OIR    2025130    131400  -10.7200 -137.6800      34.6       355       122        60
OIR    2025130    131400  -10.7200 -137.6900      34.2       355       122        60
OIR    2025130    131400  -10.7200 -137.7000      33.8       355       122        60
OIR    2025130    131400  -10.7200 -137.7100      33.6       356       125        60
OIR    2025130    131400  -10.7200 -137.7200      33.4       356       127        60
OIR    2025130    131400  -10.7200 -137.7300      33.2       356       128        60
OIR    2025130    131400  -10.7200 -137.7400      33.1       356       128        60
OIR    2025130    131400  -10.7200 -137.7500      33.0       355       129        60
OIR    2025130    131400  -10.7200 -137.7600      32.9       355       130        60
OIR    2025130    131400  -10.7200 -137.7700      32.7       355       129        60
OIR    2025130    131400  -10.7200 -137.7800      32.4       355       128        60
OIR    2025130    131400  -10.7200 -137.7900      32.1       355       126        60
OIR    2025130    131400  -10.7200 -137.8000      31.7       355       126        60
OIR    2025130    131400  -10.7200 -137.8100      31.3       354       126        60
OIR    2025130    131400  -10.7200 -137.8200      30.8       354       125        60
OIR    2025130    131400  -10.7200 -137.8300      30.1       355       124        60
OIR    2025130    131400  -10.7200 -137.8400      29.2       355       126        60
OIR    2025130    131400  -10.7200 -137.8500      28.3       355       128        60
OIR    2025130    131400  -10.7200 -137.8600      27.6       355       128        60
OIR    2025130    131400  -10.7200 -137.8700      27.2       355       128        60
OIR    2025130    131400  -10.7200 -137.8800      27.0       355       128        60
OIR    2025130    131400  -10.7200 -137.8900      26.9       355       126        60
OIR    2025130    131400  -10.7200 -137.9000      26.8       355       123        60
OIR    2025130    131400  -10.7200 -137.9100      26.8       355       125        60
OIR    2025130    131400  -10.7200 -137.9200      26.7       355       127        60
OIR    2025130    131400  -10.7200 -137.9300      26.7       355       126        60
OIR    2025130    131400  -10.7200 -137.9400      26.7       356       125        60
OIR    2025130    131400  -10.7200 -137.9500      26.7       356       126        60
OIR    2025130    131400  -10.7200 -137.9600      26.7       356       128        60
OIR    2025130    131400  -10.7200 -137.9700      26.7       356       131        60
OIR    2025130    131400  -10.7200 -137.9800      26.7       357       134        60
OIR    2025130    131400  -10.7200 -137.9900      26.7       357       135        60
OIR    2025130    131400  -10.7200 -138.0000      26.7       357       135        60
OIR    2025130    131400  -10.7200 -138.0100      26.7       357       136        60
OIR    2025130    131400  -10.7200 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.7200 -138.0300      26.7       357       138        60
OIR    2025130    131400  -10.7200 -138.0400      26.7       357       138        60
OIR    2025130    131400  -10.7200 -138.0500      26.7       357       138        60
OIR    2025130    131400  -10.7200 -138.0600      26.8       357       140        60
OIR    2025130    131400  -10.7200 -138.0700      26.8       357       141        60
OIR    2025130    131400  -10.7200 -138.0800      26.8       357       140        60
OIR    2025130    131400  -10.7200 -138.0900      26.8       357       139        60
OIR    2025130    131400  -10.7200 -138.1000      26.8       357       139        60
OIR    2025130    131400  -10.7200 -138.1100      26.9       357       139        60
OIR    2025130    131400  -10.7200 -138.1200      26.9       358       140        60
OIR    2025130    131400  -10.7200 -138.1300      26.9       358       140        60
OIR    2025130    131400  -10.7200 -138.1400      26.9       358       141        60
OIR    2025130    131400  -10.7200 -138.1500      27.0       358       140        60
OIR    2025130    131400  -10.7200 -138.1600      27.0       358       140        60
OIR    2025130    131400  -10.7200 -138.1700      27.0       358       140        60
OIR    2025130    131400  -10.7200 -138.1800      27.0       358       139        60
OIR    2025130    131400  -10.7200 -138.1900      27.0       358       141        60
OIR    2025130    131400  -10.7200 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.7200 -138.2100      27.0       358       142        60
OIR    2025130    131400  -10.7200 -138.2200      27.0       358       140        60
OIR    2025130    131400  -10.7200 -138.2300      27.0       358       137        60
OIR    2025130    131400  -10.7200 -138.2400      27.0       358       137        60
OIR    2025130    131400  -10.7200 -138.2500      27.0       358       137        60
OIR    2025130    131400  -10.7200 -138.2600      27.0       358       138        60
OIR    2025130    131400  -10.7200 -138.2700      27.0       358       139        60
OIR    2025130    131400  -10.7200 -138.2800      27.0       358       139        60
OIR    2025130    131400  -10.7200 -138.2900      27.0       358       140        60
OIR    2025130    131400  -10.7200 -138.3000      27.0       358       141        60
OIR    2025130    131400  -10.7200 -138.3100      27.0       358       143        60
OIR    2025130    131400  -10.7200 -138.3200      26.9       358       145        60
OIR    2025130    131400  -10.7200 -138.3300      26.9       358       146        60
OIR    2025130    131400  -10.7200 -138.3400      26.9       358       147        60
OIR    2025130    131400  -10.7200 -138.3500      26.9       359       149        60
OIR    2025130    131400  -10.7300 -136.6700      41.7        22       148        60
OIR    2025130    131400  -10.7300 -136.6800      41.6        21       143        60
OIR    2025130    131400  -10.7300 -136.6900      41.6        21       140        60
OIR    2025130    131400  -10.7300 -136.7000      41.6        21       140        60
OIR    2025130    131400  -10.7300 -136.7100      41.6        21       139        60
OIR    2025130    131400  -10.7300 -136.7200      41.5        21       137        60
OIR    2025130    131400  -10.7300 -136.7300      41.5        21       137        60
OIR    2025130    131400  -10.7300 -136.7400      41.4        21       137        60
OIR    2025130    131400  -10.7300 -136.7500      41.4        20       138        60
OIR    2025130    131400  -10.7300 -136.7600      41.3        20       139        60
OIR    2025130    131400  -10.7300 -136.7700      41.3        20       137        60
OIR    2025130    131400  -10.7300 -136.7800      41.2        20       135        60
OIR    2025130    131400  -10.7300 -136.7900      41.1        20       133        60
OIR    2025130    131400  -10.7300 -136.8000      41.1        20       132        60
OIR    2025130    131400  -10.7300 -136.8100      41.0        20       131        60
OIR    2025130    131400  -10.7300 -136.8200      40.9        20       131        60
OIR    2025130    131400  -10.7300 -136.8300      40.9        20       129        60
OIR    2025130    131400  -10.7300 -136.8400      40.8        20       130        60
OIR    2025130    131400  -10.7300 -136.8500      40.8        20       131        60
OIR    2025130    131400  -10.7300 -136.8600      40.8        20       131        60
OIR    2025130    131400  -10.7300 -136.8700      40.7        20       128        60
OIR    2025130    131400  -10.7300 -136.8800      40.7        19       124        60
OIR    2025130    131400  -10.7300 -136.8900      40.7        19       121        60
OIR    2025130    131400  -10.7300 -136.9000      40.6        19       123        60
OIR    2025130    131400  -10.7300 -136.9100      40.6        19       125        60
OIR    2025130    131400  -10.7300 -136.9200      40.6        19       123        60
OIR    2025130    131400  -10.7300 -136.9300      40.5        19       122        60
OIR    2025130    131400  -10.7300 -136.9400      40.4        19       122        60
OIR    2025130    131400  -10.7300 -136.9500      40.4        19       121        60
OIR    2025130    131400  -10.7300 -136.9600      40.3        18       120        60
OIR    2025130    131400  -10.7300 -136.9700      40.3        18       120        60
OIR    2025130    131400  -10.7300 -136.9800      40.3        18       122        60
OIR    2025130    131400  -10.7300 -136.9900      40.3        18       117        60
OIR    2025130    131400  -10.7300 -137.0000      40.3        18       115        60
OIR    2025130    131400  -10.7300 -137.0100      40.3        18       116        60
OIR    2025130    131400  -10.7300 -137.0200      40.3        18       119        60
OIR    2025130    131400  -10.7300 -137.0300      40.3        18       120        60
OIR    2025130    131400  -10.7300 -137.0400      40.3        17       122        60
OIR    2025130    131400  -10.7300 -137.0500      40.3        17       129        60
OIR    2025130    131400  -10.7300 -137.0600      40.3        17       135        60
OIR    2025130    131400  -10.7300 -137.0700      40.3        17       140        60
OIR    2025130    131400  -10.7300 -137.0800      40.3        17       141        60
OIR    2025130    131400  -10.7300 -137.0900      40.3        17       140        60
OIR    2025130    131400  -10.7300 -137.1000      40.4        16       139        60
OIR    2025130    131400  -10.7300 -137.1100      40.6        15       139        60
OIR    2025130    131400  -10.7300 -137.1200      40.8        14       138        60
OIR    2025130    131400  -10.7300 -137.1300      41.1        13       137        60
OIR    2025130    131400  -10.7300 -137.1400      41.2        12       137        60
OIR    2025130    131400  -10.7300 -137.1500      41.3        12       136        60
OIR    2025130    131400  -10.7300 -137.1600      41.4        12       136        60
OIR    2025130    131400  -10.7300 -137.1700      41.5        11       135        60
OIR    2025130    131400  -10.7300 -137.1800      41.6        10       130        60
OIR    2025130    131400  -10.7300 -137.1900      41.5        10       125        60
OIR    2025130    131400  -10.7300 -137.2000      41.5        10       120        60
OIR    2025130    131400  -10.7300 -137.2100      41.4        10       117        60
OIR    2025130    131400  -10.7300 -137.2200      41.4        10       116        60
OIR    2025130    131400  -10.7300 -137.2300      41.3        10       115        60
OIR    2025130    131400  -10.7300 -137.2400      41.1        10       114        60
OIR    2025130    131400  -10.7300 -137.2500      40.8         9       114        60
OIR    2025130    131400  -10.7300 -137.2600      40.4         9       114        60
OIR    2025130    131400  -10.7300 -137.2700      39.9         8       115        60
OIR    2025130    131400  -10.7300 -137.2800      39.0         6       116        60
OIR    2025130    131400  -10.7300 -137.2900      38.3         5       116        60
OIR    2025130    131400  -10.7300 -137.3000      38.0         5       116        60
OIR    2025130    131400  -10.7300 -137.3100      37.9         4       114        60
OIR    2025130    131400  -10.7300 -137.3200      37.8         4       113        60
OIR    2025130    131400  -10.7300 -137.3300      37.7         4       112        60
OIR    2025130    131400  -10.7300 -137.3400      37.7         4       110        60
OIR    2025130    131400  -10.7300 -137.3500      37.6         4       109        60
OIR    2025130    131400  -10.7300 -137.3600      37.5         4       112        60
OIR    2025130    131400  -10.7300 -137.3700      37.4         3       115        60
OIR    2025130    131400  -10.7300 -137.3800      37.1         3       117        60
OIR    2025130    131400  -10.7300 -137.3900      36.7         2       119        60
OIR    2025130    131400  -10.7300 -137.4000      36.4         2       116        60
OIR    2025130    131400  -10.7300 -137.4100      36.3         1       114        60
OIR    2025130    131400  -10.7300 -137.4200      36.2         1       111        60
OIR    2025130    131400  -10.7300 -137.4300      36.2         0       111        60
OIR    2025130    131400  -10.7300 -137.4400      36.2       359       111        60
OIR    2025130    131400  -10.7300 -137.4500      36.3       358       113        60
OIR    2025130    131400  -10.7300 -137.4600      36.5       358       115        60
OIR    2025130    131400  -10.7300 -137.4700      36.6       357       116        60
OIR    2025130    131400  -10.7300 -137.4800      36.7       357       119        60
OIR    2025130    131400  -10.7300 -137.4900      36.7       357       117        60
OIR    2025130    131400  -10.7300 -137.5000      36.8       356       117        60
OIR    2025130    131400  -10.7300 -137.5100      36.8       356       116        60
OIR    2025130    131400  -10.7300 -137.5200      36.7       356       116        60
OIR    2025130    131400  -10.7300 -137.5300      36.7       356       116        60
OIR    2025130    131400  -10.7300 -137.5400      36.6       356       117        60
OIR    2025130    131400  -10.7300 -137.5500      36.6       356       119        60
OIR    2025130    131400  -10.7300 -137.5600      36.5       355       116        60
OIR    2025130    131400  -10.7300 -137.5700      36.4       355       115        60
OIR    2025130    131400  -10.7300 -137.5800      36.3       355       115        60
OIR    2025130    131400  -10.7300 -137.5900      36.3       355       115        60
OIR    2025130    131400  -10.7300 -137.6000      36.3       355       116        60
OIR    2025130    131400  -10.7300 -137.6100      36.2       355       117        60
OIR    2025130    131400  -10.7300 -137.6200      36.2       355       122        60
OIR    2025130    131400  -10.7300 -137.6300      36.1       355       125        60
OIR    2025130    131400  -10.7300 -137.6400      36.1       355       129        60
OIR    2025130    131400  -10.7300 -137.6500      35.9       355       131        60
OIR    2025130    131400  -10.7300 -137.6600      35.6       355       130        60
OIR    2025130    131400  -10.7300 -137.6700      35.2       355       128        60
OIR    2025130    131400  -10.7300 -137.6800      34.7       355       125        60
OIR    2025130    131400  -10.7300 -137.6900      34.2       355       126        60
OIR    2025130    131400  -10.7300 -137.7000      33.9       355       127        60
OIR    2025130    131400  -10.7300 -137.7100      33.6       355       128        60
OIR    2025130    131400  -10.7300 -137.7200      33.4       355       129        60
OIR    2025130    131400  -10.7300 -137.7300      33.3       355       129        60
OIR    2025130    131400  -10.7300 -137.7400      33.2       355       130        60
OIR    2025130    131400  -10.7300 -137.7500      33.1       355       130        60
OIR    2025130    131400  -10.7300 -137.7600      32.9       355       130        60
OIR    2025130    131400  -10.7300 -137.7700      32.7       355       129        60
OIR    2025130    131400  -10.7300 -137.7800      32.4       354       128        60
OIR    2025130    131400  -10.7300 -137.7900      32.1       354       127        60
OIR    2025130    131400  -10.7300 -137.8000      31.8       354       126        60
OIR    2025130    131400  -10.7300 -137.8100      31.4       354       126        60
OIR    2025130    131400  -10.7300 -137.8200      31.0       354       125        60
OIR    2025130    131400  -10.7300 -137.8300      30.5       354       124        60
OIR    2025130    131400  -10.7300 -137.8400      29.5       354       128        60
OIR    2025130    131400  -10.7300 -137.8500      28.4       354       129        60
OIR    2025130    131400  -10.7300 -137.8600      27.6       355       130        60
OIR    2025130    131400  -10.7300 -137.8700      27.2       355       130        60
OIR    2025130    131400  -10.7300 -137.8800      27.0       355       129        60
OIR    2025130    131400  -10.7300 -137.8900      26.9       355       127        60
OIR    2025130    131400  -10.7300 -137.9000      26.8       355       125        60
OIR    2025130    131400  -10.7300 -137.9100      26.8       355       126        60
OIR    2025130    131400  -10.7300 -137.9200      26.8       355       126        60
OIR    2025130    131400  -10.7300 -137.9300      26.7       355       125        60
OIR    2025130    131400  -10.7300 -137.9400      26.7       355       124        60
OIR    2025130    131400  -10.7300 -137.9500      26.7       356       124        60
OIR    2025130    131400  -10.7300 -137.9600      26.7       356       126        60
OIR    2025130    131400  -10.7300 -137.9700      26.7       356       129        60
OIR    2025130    131400  -10.7300 -137.9800      26.7       356       132        60
OIR    2025130    131400  -10.7300 -137.9900      26.7       357       133        60
OIR    2025130    131400  -10.7300 -138.0000      26.7       357       134        60
OIR    2025130    131400  -10.7300 -138.0100      26.7       357       135        60
OIR    2025130    131400  -10.7300 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.7300 -138.0300      26.7       357       138        60
OIR    2025130    131400  -10.7300 -138.0400      26.7       357       138        60
OIR    2025130    131400  -10.7300 -138.0500      26.7       357       138        60
OIR    2025130    131400  -10.7300 -138.0600      26.8       357       139        60
OIR    2025130    131400  -10.7300 -138.0700      26.8       357       139        60
OIR    2025130    131400  -10.7300 -138.0800      26.8       357       140        60
OIR    2025130    131400  -10.7300 -138.0900      26.8       357       139        60
OIR    2025130    131400  -10.7300 -138.1000      26.8       357       138        60
OIR    2025130    131400  -10.7300 -138.1100      26.9       357       139        60
OIR    2025130    131400  -10.7300 -138.1200      26.9       358       139        60
OIR    2025130    131400  -10.7300 -138.1300      26.9       358       140        60
OIR    2025130    131400  -10.7300 -138.1400      26.9       358       141        60
OIR    2025130    131400  -10.7300 -138.1500      26.9       358       141        60
OIR    2025130    131400  -10.7300 -138.1600      26.9       358       141        60
OIR    2025130    131400  -10.7300 -138.1700      27.0       358       139        60
OIR    2025130    131400  -10.7300 -138.1800      27.0       358       139        60
OIR    2025130    131400  -10.7300 -138.1900      27.0       358       141        60
OIR    2025130    131400  -10.7300 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.7300 -138.2100      27.0       358       142        60
OIR    2025130    131400  -10.7300 -138.2200      27.0       358       141        60
OIR    2025130    131400  -10.7300 -138.2300      27.0       358       139        60
OIR    2025130    131400  -10.7300 -138.2400      27.0       358       138        60
OIR    2025130    131400  -10.7300 -138.2500      27.0       358       138        60
OIR    2025130    131400  -10.7300 -138.2600      27.0       358       139        60
OIR    2025130    131400  -10.7300 -138.2700      27.0       358       140        60
OIR    2025130    131400  -10.7300 -138.2800      27.0       358       140        60
OIR    2025130    131400  -10.7300 -138.2900      27.0       358       140        60
OIR    2025130    131400  -10.7300 -138.3000      26.9       358       141        60
OIR    2025130    131400  -10.7300 -138.3100      26.9       358       142        60
OIR    2025130    131400  -10.7300 -138.3200      26.9       358       144        60
OIR    2025130    131400  -10.7300 -138.3300      26.9       358       145        60
OIR    2025130    131400  -10.7300 -138.3400      26.9       359       146        60
OIR    2025130    131400  -10.7300 -138.3500      26.9       359       148        60
OIR    2025130    131400  -10.7400 -136.6500      41.6        22       149        60
OIR    2025130    131400  -10.7400 -136.6800      41.7        21       143        60
OIR    2025130    131400  -10.7400 -136.6900      41.7        21       139        60
OIR    2025130    131400  -10.7400 -136.7000      41.6        21       140        60
OIR    2025130    131400  -10.7400 -136.7100      41.6        21       139        60
OIR    2025130    131400  -10.7400 -136.7200      41.6        21       137        60
OIR    2025130    131400  -10.7400 -136.7300      41.5        20       137        60
OIR    2025130    131400  -10.7400 -136.7400      41.5        20       138        60
OIR    2025130    131400  -10.7400 -136.7500      41.4        20       138        60
OIR    2025130    131400  -10.7400 -136.7600      41.3        20       139        60
OIR    2025130    131400  -10.7400 -136.7700      41.2        20       137        60
OIR    2025130    131400  -10.7400 -136.7800      41.2        20       134        60
OIR    2025130    131400  -10.7400 -136.7900      41.1        20       132        60
OIR    2025130    131400  -10.7400 -136.8000      41.1        20       130        60
OIR    2025130    131400  -10.7400 -136.8100      41.0        20       130        60
OIR    2025130    131400  -10.7400 -136.8200      41.0        20       129        60
OIR    2025130    131400  -10.7400 -136.8300      40.9        20       126        60
OIR    2025130    131400  -10.7400 -136.8400      40.8        20       127        60
OIR    2025130    131400  -10.7400 -136.8500      40.8        19       129        60
OIR    2025130    131400  -10.7400 -136.8600      40.8        19       130        60
OIR    2025130    131400  -10.7400 -136.8700      40.8        19       129        60
OIR    2025130    131400  -10.7400 -136.8800      40.7        19       126        60
OIR    2025130    131400  -10.7400 -136.8900      40.7        19       124        60
OIR    2025130    131400  -10.7400 -136.9000      40.6        19       124        60
OIR    2025130    131400  -10.7400 -136.9100      40.6        19       124        60
OIR    2025130    131400  -10.7400 -136.9200      40.5        19       122        60
OIR    2025130    131400  -10.7400 -136.9300      40.5        19       121        60
OIR    2025130    131400  -10.7400 -136.9400      40.4        19       121        60
OIR    2025130    131400  -10.7400 -136.9500      40.3        18       121        60
OIR    2025130    131400  -10.7400 -136.9600      40.3        18       120        60
OIR    2025130    131400  -10.7400 -136.9700      40.3        18       121        60
OIR    2025130    131400  -10.7400 -136.9800      40.3        18       122        60
OIR    2025130    131400  -10.7400 -136.9900      40.3        18       117        60
OIR    2025130    131400  -10.7400 -137.0000      40.3        18       114        60
OIR    2025130    131400  -10.7400 -137.0100      40.3        18       116        60
OIR    2025130    131400  -10.7400 -137.0200      40.3        18       119        60
OIR    2025130    131400  -10.7400 -137.0300      40.3        18       120        60
OIR    2025130    131400  -10.7400 -137.0400      40.3        17       123        60
OIR    2025130    131400  -10.7400 -137.0500      40.3        17       130        60
OIR    2025130    131400  -10.7400 -137.0600      40.3        17       134        60
OIR    2025130    131400  -10.7400 -137.0700      40.3        17       137        60
OIR    2025130    131400  -10.7400 -137.0800      40.3        17       139        60
OIR    2025130    131400  -10.7400 -137.0900      40.3        17       140        60
OIR    2025130    131400  -10.7400 -137.1000      40.4        16       139        60
OIR    2025130    131400  -10.7400 -137.1100      40.7        15       138        60
OIR    2025130    131400  -10.7400 -137.1200      41.0        14       138        60
OIR    2025130    131400  -10.7400 -137.1300      41.1        13       137        60
OIR    2025130    131400  -10.7400 -137.1400      41.2        12       137        60
OIR    2025130    131400  -10.7400 -137.1500      41.2        12       136        60
OIR    2025130    131400  -10.7400 -137.1600      41.3        12       135        60
OIR    2025130    131400  -10.7400 -137.1700      41.4        11       132        60
OIR    2025130    131400  -10.7400 -137.1800      41.5        10       127        60
OIR    2025130    131400  -10.7400 -137.1900      41.5        10       122        60
OIR    2025130    131400  -10.7400 -137.2000      41.4        10       117        60
OIR    2025130    131400  -10.7400 -137.2100      41.4        10       116        60
OIR    2025130    131400  -10.7400 -137.2200      41.3        10       116        60
OIR    2025130    131400  -10.7400 -137.2300      41.2        10       115        60
OIR    2025130    131400  -10.7400 -137.2400      41.0         9       112        60
OIR    2025130    131400  -10.7400 -137.2500      40.7         9       113        60
OIR    2025130    131400  -10.7400 -137.2600      40.4         8       114        60
OIR    2025130    131400  -10.7400 -137.2700      39.9         7       114        60
OIR    2025130    131400  -10.7400 -137.2800      39.4         6       115        60
OIR    2025130    131400  -10.7400 -137.2900      38.9         6       115        60
OIR    2025130    131400  -10.7400 -137.3000      38.5         5       114        60
OIR    2025130    131400  -10.7400 -137.3100      38.2         5       112        60
OIR    2025130    131400  -10.7400 -137.3200      38.0         4       112        60
OIR    2025130    131400  -10.7400 -137.3300      37.9         4       111        60
OIR    2025130    131400  -10.7400 -137.3400      37.8         4       112        60
OIR    2025130    131400  -10.7400 -137.3500      37.8         4       112        60
OIR    2025130    131400  -10.7400 -137.3600      37.6         4       113        60
OIR    2025130    131400  -10.7400 -137.3700      37.4         3       114        60
OIR    2025130    131400  -10.7400 -137.3800      37.1         3       116        60
OIR    2025130    131400  -10.7400 -137.3900      36.7         2       116        60
OIR    2025130    131400  -10.7400 -137.4000      36.4         2       113        60
OIR    2025130    131400  -10.7400 -137.4100      36.3         1       111        60
OIR    2025130    131400  -10.7400 -137.4200      36.3         1       110        60
OIR    2025130    131400  -10.7400 -137.4300      36.2         0       111        60
OIR    2025130    131400  -10.7400 -137.4400      36.2       359       113        60
OIR    2025130    131400  -10.7400 -137.4500      36.4       358       114        60
OIR    2025130    131400  -10.7400 -137.4600      36.5       357       115        60
OIR    2025130    131400  -10.7400 -137.4700      36.6       357       116        60
OIR    2025130    131400  -10.7400 -137.4800      36.7       357       117        60
OIR    2025130    131400  -10.7400 -137.4900      36.8       356       116        60
OIR    2025130    131400  -10.7400 -137.5000      36.8       356       116        60
OIR    2025130    131400  -10.7400 -137.5100      36.8       356       116        60
OIR    2025130    131400  -10.7400 -137.5200      36.8       356       116        60
OIR    2025130    131400  -10.7400 -137.5300      36.7       356       116        60
OIR    2025130    131400  -10.7400 -137.5400      36.7       356       116        60
OIR    2025130    131400  -10.7400 -137.5500      36.6       355       117        60
OIR    2025130    131400  -10.7400 -137.5600      36.5       355       116        60
OIR    2025130    131400  -10.7400 -137.5700      36.4       355       116        60
OIR    2025130    131400  -10.7400 -137.5800      36.4       355       116        60
OIR    2025130    131400  -10.7400 -137.5900      36.3       355       117        60
OIR    2025130    131400  -10.7400 -137.6000      36.3       355       117        60
OIR    2025130    131400  -10.7400 -137.6100      36.2       355       119        60
OIR    2025130    131400  -10.7400 -137.6200      36.2       355       122        60
OIR    2025130    131400  -10.7400 -137.6300      36.2       355       124        60
OIR    2025130    131400  -10.7400 -137.6400      36.1       355       126        60
OIR    2025130    131400  -10.7400 -137.6500      36.0       355       128        60
OIR    2025130    131400  -10.7400 -137.6600      35.7       354       130        60
OIR    2025130    131400  -10.7400 -137.6700      35.3       354       130        60
OIR    2025130    131400  -10.7400 -137.6800      34.7       354       129        60
OIR    2025130    131400  -10.7400 -137.6900      34.3       355       129        60
OIR    2025130    131400  -10.7400 -137.7000      34.0       355       129        60
OIR    2025130    131400  -10.7400 -137.7100      33.7       355       130        60
OIR    2025130    131400  -10.7400 -137.7200      33.5       355       131        60
OIR    2025130    131400  -10.7400 -137.7300      33.3       355       130        60
OIR    2025130    131400  -10.7400 -137.7400      33.2       355       130        60
OIR    2025130    131400  -10.7400 -137.7500      33.1       355       131        60
OIR    2025130    131400  -10.7400 -137.7600      33.0       355       130        60
OIR    2025130    131400  -10.7400 -137.7700      32.7       354       129        60
OIR    2025130    131400  -10.7400 -137.7800      32.4       354       128        60
OIR    2025130    131400  -10.7400 -137.7900      32.2       354       128        60
OIR    2025130    131400  -10.7400 -137.8000      31.9       353       127        60
OIR    2025130    131400  -10.7400 -137.8100      31.6       353       126        60
OIR    2025130    131400  -10.7400 -137.8200      31.2       353       126        60
OIR    2025130    131400  -10.7400 -137.8300      30.6       353       126        60
OIR    2025130    131400  -10.7400 -137.8400      29.6       354       130        60
OIR    2025130    131400  -10.7400 -137.8500      28.5       354       132        60
OIR    2025130    131400  -10.7400 -137.8600      27.6       354       131        60
OIR    2025130    131400  -10.7400 -137.8700      27.3       354       131        60
OIR    2025130    131400  -10.7400 -137.8800      27.1       355       131        60
OIR    2025130    131400  -10.7400 -137.8900      26.9       355       130        60
OIR    2025130    131400  -10.7400 -137.9000      26.9       355       128        60
OIR    2025130    131400  -10.7400 -137.9100      26.8       355       127        60
OIR    2025130    131400  -10.7400 -137.9200      26.8       355       125        60
OIR    2025130    131400  -10.7400 -137.9300      26.8       355       124        60
OIR    2025130    131400  -10.7400 -137.9400      26.8       355       123        60
OIR    2025130    131400  -10.7400 -137.9500      26.8       356       123        60
OIR    2025130    131400  -10.7400 -137.9600      26.8       356       124        60
OIR    2025130    131400  -10.7400 -137.9700      26.8       356       127        60
OIR    2025130    131400  -10.7400 -137.9800      26.7       356       130        60
OIR    2025130    131400  -10.7400 -137.9900      26.8       356       132        60
OIR    2025130    131400  -10.7400 -138.0000      26.7       357       133        60
OIR    2025130    131400  -10.7400 -138.0100      26.7       357       135        60
OIR    2025130    131400  -10.7400 -138.0200      26.7       357       137        60
OIR    2025130    131400  -10.7400 -138.0300      26.7       357       139        60
OIR    2025130    131400  -10.7400 -138.0400      26.7       357       139        60
OIR    2025130    131400  -10.7400 -138.0500      26.7       357       140        60
OIR    2025130    131400  -10.7400 -138.0600      26.8       357       140        60
OIR    2025130    131400  -10.7400 -138.0700      26.8       357       140        60
OIR    2025130    131400  -10.7400 -138.0800      26.8       357       141        60
OIR    2025130    131400  -10.7400 -138.0900      26.8       357       141        60
OIR    2025130    131400  -10.7400 -138.1000      26.8       357       140        60
OIR    2025130    131400  -10.7400 -138.1100      26.9       357       140        60
OIR    2025130    131400  -10.7400 -138.1200      26.9       358       142        60
OIR    2025130    131400  -10.7400 -138.1300      26.9       358       142        60
OIR    2025130    131400  -10.7400 -138.1400      26.9       358       142        60
OIR    2025130    131400  -10.7400 -138.1500      26.9       358       143        60
OIR    2025130    131400  -10.7400 -138.1600      26.9       358       142        60
OIR    2025130    131400  -10.7400 -138.1700      26.9       358       141        60
OIR    2025130    131400  -10.7400 -138.1800      27.0       358       140        60
OIR    2025130    131400  -10.7400 -138.1900      27.0       358       141        60
OIR    2025130    131400  -10.7400 -138.2000      27.0       358       142        60
OIR    2025130    131400  -10.7400 -138.2100      27.0       358       142        60
OIR    2025130    131400  -10.7400 -138.2200      27.0       358       142        60
OIR    2025130    131400  -10.7400 -138.2300      27.0       358       141        60
OIR    2025130    131400  -10.7400 -138.2400      27.0       358       140        60
OIR    2025130    131400  -10.7400 -138.2500      27.0       358       139        60
OIR    2025130    131400  -10.7400 -138.2600      27.0       358       140        60
OIR    2025130    131400  -10.7400 -138.2700      27.0       358       140        60
OIR    2025130    131400  -10.7400 -138.2800      26.9       358       140        60
OIR    2025130    131400  -10.7400 -138.2900      26.9       358       140        60
OIR    2025130    131400  -10.7400 -138.3000      26.9       358       142        60
OIR    2025130    131400  -10.7400 -138.3100      26.9       358       144        60
OIR    2025130    131400  -10.7400 -138.3200      26.9       358       144        60
OIR    2025130    131400  -10.7400 -138.3300      26.9       358       146        60
OIR    2025130    131400  -10.7400 -138.3400      26.9       359       147        60
OIR    2025130    131400  -10.7500 -136.6500      41.7        22       148        60
OIR    2025130    131400  -10.7500 -136.6800      41.7        21       143        60
OIR    2025130    131400  -10.7500 -136.6900      41.7        21       139        60
OIR    2025130    131400  -10.7500 -136.7000      41.6        21       140        60
OIR    2025130    131400  -10.7500 -136.7100      41.6        21       139        60
OIR    2025130    131400  -10.7500 -136.7200      41.6        21       136        60
OIR    2025130    131400  -10.7500 -136.7300      41.5        20       137        60
OIR    2025130    131400  -10.7500 -136.7400      41.5        20       138        60
OIR    2025130    131400  -10.7500 -136.7500      41.4        20       138        60
OIR    2025130    131400  -10.7500 -136.7600      41.4        20       138        60
OIR    2025130    131400  -10.7500 -136.7700      41.3        20       136        60
OIR    2025130    131400  -10.7500 -136.7800      41.2        20       133        60
OIR    2025130    131400  -10.7500 -136.7900      41.1        20       130        60
OIR    2025130    131400  -10.7500 -136.8000      41.1        20       129        60
OIR    2025130    131400  -10.7500 -136.8100      41.0        20       129        60
OIR    2025130    131400  -10.7500 -136.8200      41.0        20       128        60
OIR    2025130    131400  -10.7500 -136.8300      40.9        19       124        60
OIR    2025130    131400  -10.7500 -136.8400      40.9        19       124        60
OIR    2025130    131400  -10.7500 -136.8500      40.8        19       127        60
OIR    2025130    131400  -10.7500 -136.8600      40.8        19       129        60
OIR    2025130    131400  -10.7500 -136.8700      40.8        19       129        60
OIR    2025130    131400  -10.7500 -136.8800      40.7        19       128        60
OIR    2025130    131400  -10.7500 -136.8900      40.6        19       127        60
OIR    2025130    131400  -10.7500 -136.9000      40.6        19       125        60
OIR    2025130    131400  -10.7500 -136.9100      40.6        19       123        60
OIR    2025130    131400  -10.7500 -136.9200      40.5        19       120        60
OIR    2025130    131400  -10.7500 -136.9300      40.4        19       119        60
OIR    2025130    131400  -10.7500 -136.9400      40.4        19       119        60
OIR    2025130    131400  -10.7500 -136.9500      40.3        18       120        60
OIR    2025130    131400  -10.7500 -136.9600      40.3        18       120        60
OIR    2025130    131400  -10.7500 -136.9700      40.3        18       120        60
OIR    2025130    131400  -10.7500 -136.9800      40.3        18       120        60
OIR    2025130    131400  -10.7500 -136.9900      40.3        18       116        60
OIR    2025130    131400  -10.7500 -137.0000      40.3        18       113        60
OIR    2025130    131400  -10.7500 -137.0100      40.3        18       116        60
OIR    2025130    131400  -10.7500 -137.0200      40.3        18       120        60
OIR    2025130    131400  -10.7500 -137.0300      40.3        18       120        60
OIR    2025130    131400  -10.7500 -137.0400      40.3        17       123        60
OIR    2025130    131400  -10.7500 -137.0500      40.3        17       129        60
OIR    2025130    131400  -10.7500 -137.0600      40.3        17       132        60
OIR    2025130    131400  -10.7500 -137.0700      40.3        17       134        60
OIR    2025130    131400  -10.7500 -137.0800      40.3        17       137        60
OIR    2025130    131400  -10.7500 -137.0900      40.3        16       139        60
OIR    2025130    131400  -10.7500 -137.1000      40.5        15       139        60
OIR    2025130    131400  -10.7500 -137.1100      40.8        14       137        60
OIR    2025130    131400  -10.7500 -137.1200      41.1        13       137        60
OIR    2025130    131400  -10.7500 -137.1300      41.2        12       137        60
OIR    2025130    131400  -10.7500 -137.1400      41.2        12       137        60
OIR    2025130    131400  -10.7500 -137.1500      41.2        12       136        60
OIR    2025130    131400  -10.7500 -137.1600      41.2        12       134        60
OIR    2025130    131400  -10.7500 -137.1700      41.3        11       129        60
OIR    2025130    131400  -10.7500 -137.1800      41.3        10       124        60
OIR    2025130    131400  -10.7500 -137.1900      41.3        10       120        60
OIR    2025130    131400  -10.7500 -137.2000      41.3        10       116        60
OIR    2025130    131400  -10.7500 -137.2100      41.3        10       116        60
OIR    2025130    131400  -10.7500 -137.2200      41.2        10       116        60
OIR    2025130    131400  -10.7500 -137.2300      41.1         9       113        60
OIR    2025130    131400  -10.7500 -137.2400      41.0         9       110        60
OIR    2025130    131400  -10.7500 -137.2500      40.7         9       113        60
OIR    2025130    131400  -10.7500 -137.2600      40.4         8       114        60
OIR    2025130    131400  -10.7500 -137.2700      40.1         7       114        60
OIR    2025130    131400  -10.7500 -137.2800      39.9         7       114        60
OIR    2025130    131400  -10.7500 -137.2900      39.6         6       114        60
OIR    2025130    131400  -10.7500 -137.3000      39.4         6       113        60
OIR    2025130    131400  -10.7500 -137.3100      39.2         5       111        60
OIR    2025130    131400  -10.7500 -137.3200      38.9         5       111        60
OIR    2025130    131400  -10.7500 -137.3300      38.3         4       112        60
OIR    2025130    131400  -10.7500 -137.3400      38.0         4       113        60
OIR    2025130    131400  -10.7500 -137.3500      37.9         4       115        60
OIR    2025130    131400  -10.7500 -137.3600      37.7         4       114        60
OIR    2025130    131400  -10.7500 -137.3700      37.5         3       113        60
OIR    2025130    131400  -10.7500 -137.3800      37.3         3       114        60
OIR    2025130    131400  -10.7500 -137.3900      36.9         2       115        60
OIR    2025130    131400  -10.7500 -137.4000      36.5         1       111        60
OIR    2025130    131400  -10.7500 -137.4100      36.4         1       110        60
OIR    2025130    131400  -10.7500 -137.4200      36.4         1       110        60
OIR    2025130    131400  -10.7500 -137.4300      36.4       360       111        60
OIR    2025130    131400  -10.7500 -137.4400      36.5       359       113        60
OIR    2025130    131400  -10.7500 -137.4500      36.6       358       115        60
OIR    2025130    131400  -10.7500 -137.4600      36.7       357       116        60
OIR    2025130    131400  -10.7500 -137.4700      36.7       357       116        60
OIR    2025130    131400  -10.7500 -137.4800      36.8       357       116        60
OIR    2025130    131400  -10.7500 -137.4900      36.8       356       116        60
OIR    2025130    131400  -10.7500 -137.5000      36.8       356       115        60
OIR    2025130    131400  -10.7500 -137.5100      36.8       356       116        60
OIR    2025130    131400  -10.7500 -137.5200      36.8       356       116        60
OIR    2025130    131400  -10.7500 -137.5300      36.8       356       116        60
OIR    2025130    131400  -10.7500 -137.5400      36.7       356       116        60
OIR    2025130    131400  -10.7500 -137.5500      36.6       355       116        60
OIR    2025130    131400  -10.7500 -137.5600      36.5       355       116        60
OIR    2025130    131400  -10.7500 -137.5700      36.4       355       116        60
OIR    2025130    131400  -10.7500 -137.5800      36.4       355       119        60
OIR    2025130    131400  -10.7500 -137.5900      36.3       355       120        60
OIR    2025130    131400  -10.7500 -137.6000      36.3       355       119        60
OIR    2025130    131400  -10.7500 -137.6100      36.3       355       119        60
OIR    2025130    131400  -10.7500 -137.6200      36.2       355       121        60
OIR    2025130    131400  -10.7500 -137.6300      36.2       355       123        60
OIR    2025130    131400  -10.7500 -137.6400      36.2       355       125        60
OIR    2025130    131400  -10.7500 -137.6500      36.1       354       127        60
OIR    2025130    131400  -10.7500 -137.6600      35.9       354       129        60
OIR    2025130    131400  -10.7500 -137.6700      35.5       354       130        60
OIR    2025130    131400  -10.7500 -137.6800      35.0       354       130        60
OIR    2025130    131400  -10.7500 -137.6900      34.5       354       130        60
OIR    2025130    131400  -10.7500 -137.7000      34.1       355       130        60
OIR    2025130    131400  -10.7500 -137.7100      33.8       355       131        60
OIR    2025130    131400  -10.7500 -137.7200      33.6       355       132        60
OIR    2025130    131400  -10.7500 -137.7300      33.4       355       131        60
OIR    2025130    131400  -10.7500 -137.7400      33.3       355       131        60
OIR    2025130    131400  -10.7500 -137.7500      33.2       354       131        60
OIR    2025130    131400  -10.7500 -137.7600      33.0       354       131        60
OIR    2025130    131400  -10.7500 -137.7700      32.8       354       129        60
OIR    2025130    131400  -10.7500 -137.7800      32.5       354       129        60
OIR    2025130    131400  -10.7500 -137.7900      32.2       353       129        60
OIR    2025130    131400  -10.7500 -137.8000      31.9       353       128        60
OIR    2025130    131400  -10.7500 -137.8100      31.6       353       127        60
OIR    2025130    131400  -10.7500 -137.8200      31.3       353       127        60
OIR    2025130    131400  -10.7500 -137.8300      30.6       353       128        60
OIR    2025130    131400  -10.7500 -137.8400      29.7       353       132        60
OIR    2025130    131400  -10.7500 -137.8500      28.4       353       133        60
OIR    2025130    131400  -10.7500 -137.8600      27.6       354       133        60
OIR    2025130    131400  -10.7500 -137.8700      27.3       354       132        60
OIR    2025130    131400  -10.7500 -137.8800      27.1       354       133        60
OIR    2025130    131400  -10.7500 -137.8900      27.0       354       132        60
OIR    2025130    131400  -10.7500 -137.9000      26.9       354       131        60
OIR    2025130    131400  -10.7500 -137.9100      26.8       354       129        60
OIR    2025130    131400  -10.7500 -137.9200      26.8       355       127        60
OIR    2025130    131400  -10.7500 -137.9300      26.8       355       125        60
OIR    2025130    131400  -10.7500 -137.9400      26.8       355       124        60
OIR    2025130    131400  -10.7500 -137.9500      26.8       355       123        60
OIR    2025130    131400  -10.7500 -137.9600      26.8       356       124        60
OIR    2025130    131400  -10.7500 -137.9700      26.8       356       126        60
OIR    2025130    131400  -10.7500 -137.9800      26.8       356       128        60
OIR    2025130    131400  -10.7500 -137.9900      26.8       356       130        60
OIR    2025130    131400  -10.7500 -138.0000      26.7       357       132        60
OIR    2025130    131400  -10.7500 -138.0100      26.7       357       135        60
OIR    2025130    131400  -10.7500 -138.0200      26.7       357       136        60
OIR    2025130    131400  -10.7500 -138.0300      26.7       357       138        60
OIR    2025130    131400  -10.7500 -138.0400      26.7       357       140        60
OIR    2025130    131400  -10.7500 -138.0500      26.8       357       140        60
OIR    2025130    131400  -10.7500 -138.0600      26.8       357       140        60
OIR    2025130    131400  -10.7500 -138.0700      26.8       357       140        60
OIR    2025130    131400  -10.7500 -138.0800      26.8       357       141        60
OIR    2025130    131400  -10.7500 -138.0900      26.8       357       142        60
OIR    2025130    131400  -10.7500 -138.1000      26.9       357       140        60
OIR    2025130    131400  -10.7500 -138.1100      26.9       357       141        60
OIR    2025130    131400  -10.7500 -138.1200      26.9       358       142        60
OIR    2025130    131400  -10.7500 -138.1300      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.1400      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.1500      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.1600      26.9       358       144        60
OIR    2025130    131400  -10.7500 -138.1700      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.1800      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.1900      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.2000      27.0       358       143        60
OIR    2025130    131400  -10.7500 -138.2100      27.0       358       143        60
OIR    2025130    131400  -10.7500 -138.2200      27.0       358       142        60
OIR    2025130    131400  -10.7500 -138.2300      27.0       358       142        60
OIR    2025130    131400  -10.7500 -138.2400      27.0       358       141        60
OIR    2025130    131400  -10.7500 -138.2500      27.0       358       140        60
OIR    2025130    131400  -10.7500 -138.2600      26.9       358       141        60
OIR    2025130    131400  -10.7500 -138.2700      26.9       358       141        60
OIR    2025130    131400  -10.7500 -138.2800      26.9       358       141        60
OIR    2025130    131400  -10.7500 -138.2900      26.9       358       141        60
OIR    2025130    131400  -10.7500 -138.3000      26.9       358       143        60
OIR    2025130    131400  -10.7500 -138.3100      26.9       358       145        60
OIR    2025130    131400  -10.7500 -138.3200      26.9       358       146        60
OIR    2025130    131400  -10.7500 -138.3300      26.9       359       147        60
OIR    2025130    131400  -10.7500 -138.3400      26.9       359       148        60
OIR    2025130    131400  -10.7600 -136.6600      41.7        21       150        60
OIR    2025130    131400  -10.7600 -136.6700      41.7        21       147        60
OIR    2025130    131400  -10.7600 -136.6800      41.7        21       142        60
OIR    2025130    131400  -10.7600 -136.6900      41.7        21       140        60
OIR    2025130    131400  -10.7600 -136.7000      41.7        21       140        60
OIR    2025130    131400  -10.7600 -136.7100      41.6        21       140        60
OIR    2025130    131400  -10.7600 -136.7200      41.6        20       138        60
OIR    2025130    131400  -10.7600 -136.7300      41.5        20       138        60
OIR    2025130    131400  -10.7600 -136.7400      41.5        20       138        60
OIR    2025130    131400  -10.7600 -136.7500      41.4        20       138        60
OIR    2025130    131400  -10.7600 -136.7600      41.4        20       139        60
OIR    2025130    131400  -10.7600 -136.7700      41.3        20       137        60
OIR    2025130    131400  -10.7600 -136.7800      41.2        20       134        60
OIR    2025130    131400  -10.7600 -136.7900      41.2        20       131        60
OIR    2025130    131400  -10.7600 -136.8000      41.1        20       130        60
OIR    2025130    131400  -10.7600 -136.8100      41.1        19       130        60
OIR    2025130    131400  -10.7600 -136.8200      41.0        19       128        60
OIR    2025130    131400  -10.7600 -136.8300      40.9        19       125        60
OIR    2025130    131400  -10.7600 -136.8400      40.9        19       125        60
OIR    2025130    131400  -10.7600 -136.8500      40.9        19       125        60
OIR    2025130    131400  -10.7600 -136.8600      40.8        19       127        60
OIR    2025130    131400  -10.7600 -136.8700      40.8        19       129        60
OIR    2025130    131400  -10.7600 -136.8800      40.7        19       128        60
OIR    2025130    131400  -10.7600 -136.8900      40.7        19       126        60
OIR    2025130    131400  -10.7600 -136.9000      40.6        19       123        60
OIR    2025130    131400  -10.7600 -136.9100      40.6        19       121        60
OIR    2025130    131400  -10.7600 -136.9200      40.5        19       119        60
OIR    2025130    131400  -10.7600 -136.9300      40.4        19       117        60
OIR    2025130    131400  -10.7600 -136.9400      40.4        19       117        60
OIR    2025130    131400  -10.7600 -136.9500      40.3        18       116        60
OIR    2025130    131400  -10.7600 -136.9600      40.3        18       116        60
OIR    2025130    131400  -10.7600 -136.9700      40.3        18       116        60
OIR    2025130    131400  -10.7600 -136.9800      40.3        18       115        60
OIR    2025130    131400  -10.7600 -136.9900      40.3        18       114        60
OIR    2025130    131400  -10.7600 -137.0000      40.3        18       113        60
OIR    2025130    131400  -10.7600 -137.0100      40.3        18       117        60
OIR    2025130    131400  -10.7600 -137.0200      40.3        18       122        60
OIR    2025130    131400  -10.7600 -137.0300      40.3        18       120        60
OIR    2025130    131400  -10.7600 -137.0400      40.3        17       119        60
OIR    2025130    131400  -10.7600 -137.0500      40.4        17       124        60
OIR    2025130    131400  -10.7600 -137.0600      40.4        17       128        60
OIR    2025130    131400  -10.7600 -137.0700      40.5        17       132        60
OIR    2025130    131400  -10.7600 -137.0800      40.5        17       135        60
OIR    2025130    131400  -10.7600 -137.0900      40.8        16       137        60
OIR    2025130    131400  -10.7600 -137.1000      41.1        14       138        60
OIR    2025130    131400  -10.7600 -137.1100      41.2        13       138        60
OIR    2025130    131400  -10.7600 -137.1200      41.2        13       139        60
OIR    2025130    131400  -10.7600 -137.1300      41.2        12       139        60
OIR    2025130    131400  -10.7600 -137.1400      41.2        12       140        60
OIR    2025130    131400  -10.7600 -137.1500      41.2        12       138        60
OIR    2025130    131400  -10.7600 -137.1600      41.2        11       132        60
OIR    2025130    131400  -10.7600 -137.1700      41.2        11       128        60
OIR    2025130    131400  -10.7600 -137.1800      41.2        10       124        60
OIR    2025130    131400  -10.7600 -137.1900      41.3        10       119        60
OIR    2025130    131400  -10.7600 -137.2000      41.2        10       114        60
OIR    2025130    131400  -10.7600 -137.2100      41.2        10       112        60
OIR    2025130    131400  -10.7600 -137.2200      41.1         9       111        60
OIR    2025130    131400  -10.7600 -137.2300      41.1         9       113        60
OIR    2025130    131400  -10.7600 -137.2400      40.9         9       114        60
OIR    2025130    131400  -10.7600 -137.2500      40.8         8       114        60
OIR    2025130    131400  -10.7600 -137.2600      40.5         7       115        60
OIR    2025130    131400  -10.7600 -137.2700      40.4         7       115        60
OIR    2025130    131400  -10.7600 -137.2800      40.2         6       114        60
OIR    2025130    131400  -10.7600 -137.2900      40.0         6       113        60
OIR    2025130    131400  -10.7600 -137.3000      39.9         6       112        60
OIR    2025130    131400  -10.7600 -137.3100      39.9         6       112        60
OIR    2025130    131400  -10.7600 -137.3200      39.8         5       114        60
OIR    2025130    131400  -10.7600 -137.3300      39.6         5       116        60
OIR    2025130    131400  -10.7600 -137.3400      39.2         4       116        60
OIR    2025130    131400  -10.7600 -137.3500      38.7         4       117        60
OIR    2025130    131400  -10.7600 -137.3600      38.3         3       116        60
OIR    2025130    131400  -10.7600 -137.3700      38.0         3       114        60
OIR    2025130    131400  -10.7600 -137.3800      37.7         2       114        60
OIR    2025130    131400  -10.7600 -137.3900      37.3         2       113        60
OIR    2025130    131400  -10.7600 -137.4000      36.8         1       112        60
OIR    2025130    131400  -10.7600 -137.4100      36.7         1       111        60
OIR    2025130    131400  -10.7600 -137.4200      36.7         0       109        60
OIR    2025130    131400  -10.7600 -137.4300      36.7       359       110        60
OIR    2025130    131400  -10.7600 -137.4400      36.7       359       112        60
OIR    2025130    131400  -10.7600 -137.4500      36.7       358       114        60
OIR    2025130    131400  -10.7600 -137.4600      36.8       357       116        60
OIR    2025130    131400  -10.7600 -137.4700      36.8       357       114        60
OIR    2025130    131400  -10.7600 -137.4800      36.8       356       113        60
OIR    2025130    131400  -10.7600 -137.4900      36.8       356       114        60
OIR    2025130    131400  -10.7600 -137.5000      36.9       356       115        60
OIR    2025130    131400  -10.7600 -137.5100      36.9       356       116        60
OIR    2025130    131400  -10.7600 -137.5200      36.8       356       116        60
OIR    2025130    131400  -10.7600 -137.5300      36.8       356       114        60
OIR    2025130    131400  -10.7600 -137.5400      36.7       355       114        60
OIR    2025130    131400  -10.7600 -137.5500      36.6       355       114        60
OIR    2025130    131400  -10.7600 -137.5600      36.6       355       116        60
OIR    2025130    131400  -10.7600 -137.5700      36.5       355       119        60
OIR    2025130    131400  -10.7600 -137.5800      36.4       355       121        60
OIR    2025130    131400  -10.7600 -137.5900      36.4       355       122        60
OIR    2025130    131400  -10.7600 -137.6000      36.3       355       119        60
OIR    2025130    131400  -10.7600 -137.6100      36.3       355       117        60
OIR    2025130    131400  -10.7600 -137.6200      36.3       355       120        60
OIR    2025130    131400  -10.7600 -137.6300      36.3       355       123        60
OIR    2025130    131400  -10.7600 -137.6400      36.2       354       126        60
OIR    2025130    131400  -10.7600 -137.6500      36.1       354       127        60
OIR    2025130    131400  -10.7600 -137.6600      36.0       354       127        60
OIR    2025130    131400  -10.7600 -137.6700      35.8       354       128        60
OIR    2025130    131400  -10.7600 -137.6800      35.4       354       129        60
OIR    2025130    131400  -10.7600 -137.6900      35.0       354       130        60
OIR    2025130    131400  -10.7600 -137.7000      34.5       354       131        60
OIR    2025130    131400  -10.7600 -137.7100      34.2       354       132        60
OIR    2025130    131400  -10.7600 -137.7200      33.9       354       132        60
OIR    2025130    131400  -10.7600 -137.7300      33.6       354       132        60
OIR    2025130    131400  -10.7600 -137.7400      33.4       354       131        60
OIR    2025130    131400  -10.7600 -137.7500      33.2       354       131        60
OIR    2025130    131400  -10.7600 -137.7600      33.0       354       131        60
OIR    2025130    131400  -10.7600 -137.7700      32.8       354       130        60
OIR    2025130    131400  -10.7600 -137.7800      32.6       353       130        60
OIR    2025130    131400  -10.7600 -137.7900      32.3       353       130        60
OIR    2025130    131400  -10.7600 -137.8000      32.1       353       129        60
OIR    2025130    131400  -10.7600 -137.8100      31.8       353       127        60
OIR    2025130    131400  -10.7600 -137.8200      31.4       352       129        60
OIR    2025130    131400  -10.7600 -137.8300      30.7       352       131        60
OIR    2025130    131400  -10.7600 -137.8400      29.8       352       134        60
OIR    2025130    131400  -10.7600 -137.8500      28.5       353       134        60
OIR    2025130    131400  -10.7600 -137.8600      27.6       354       134        60
OIR    2025130    131400  -10.7600 -137.8700      27.4       354       133        60
OIR    2025130    131400  -10.7600 -137.8800      27.2       354       134        60
OIR    2025130    131400  -10.7600 -137.8900      27.1       354       135        60
OIR    2025130    131400  -10.7600 -137.9000      27.0       354       134        60
OIR    2025130    131400  -10.7600 -137.9100      26.9       354       133        60
OIR    2025130    131400  -10.7600 -137.9200      26.9       354       131        60
OIR    2025130    131400  -10.7600 -137.9300      26.8       354       129        60
OIR    2025130    131400  -10.7600 -137.9400      26.9       355       127        60
OIR    2025130    131400  -10.7600 -137.9500      26.9       355       126        60
OIR    2025130    131400  -10.7600 -137.9600      26.9       355       126        60
OIR    2025130    131400  -10.7600 -137.9700      26.8       355       127        60
OIR    2025130    131400  -10.7600 -137.9800      26.8       356       128        60
OIR    2025130    131400  -10.7600 -137.9900      26.8       356       128        60
OIR    2025130    131400  -10.7600 -138.0000      26.8       356       131        60
OIR    2025130    131400  -10.7600 -138.0100      26.7       357       135        60
OIR    2025130    131400  -10.7600 -138.0200      26.7       357       136        60
OIR    2025130    131400  -10.7600 -138.0300      26.7       357       137        60
OIR    2025130    131400  -10.7600 -138.0400      26.8       357       139        60
OIR    2025130    131400  -10.7600 -138.0500      26.8       357       140        60
OIR    2025130    131400  -10.7600 -138.0600      26.8       357       140        60
OIR    2025130    131400  -10.7600 -138.0700      26.8       357       140        60
OIR    2025130    131400  -10.7600 -138.0800      26.8       357       141        60
OIR    2025130    131400  -10.7600 -138.0900      26.9       357       141        60
OIR    2025130    131400  -10.7600 -138.1000      26.9       357       141        60
OIR    2025130    131400  -10.7600 -138.1100      26.9       358       140        60
OIR    2025130    131400  -10.7600 -138.1200      26.9       358       140        60
OIR    2025130    131400  -10.7600 -138.1300      26.9       358       141        60
OIR    2025130    131400  -10.7600 -138.1400      26.9       358       142        60
OIR    2025130    131400  -10.7600 -138.1500      26.9       358       144        60
OIR    2025130    131400  -10.7600 -138.1600      26.9       358       145        60
OIR    2025130    131400  -10.7600 -138.1700      26.9       358       147        60
OIR    2025130    131400  -10.7600 -138.1800      26.9       358       148        60
OIR    2025130    131400  -10.7600 -138.1900      26.9       358       146        60
OIR    2025130    131400  -10.7600 -138.2000      26.9       358       144        60
OIR    2025130    131400  -10.7600 -138.2100      27.0       358       144        60
OIR    2025130    131400  -10.7600 -138.2200      27.0       358       143        60
OIR    2025130    131400  -10.7600 -138.2300      27.0       358       142        60
OIR    2025130    131400  -10.7600 -138.2400      27.0       358       141        60
OIR    2025130    131400  -10.7600 -138.2500      26.9       358       141        60
OIR    2025130    131400  -10.7600 -138.2600      26.9       358       142        60
OIR    2025130    131400  -10.7600 -138.2700      26.9       358       143        60
OIR    2025130    131400  -10.7600 -138.2800      26.9       358       143        60
OIR    2025130    131400  -10.7600 -138.2900      26.9       358       142        60
OIR    2025130    131400  -10.7600 -138.3000      26.9       358       144        60
OIR    2025130    131400  -10.7600 -138.3100      26.9       358       146        60
OIR    2025130    131400  -10.7600 -138.3200      26.9       358       148        60
OIR    2025130    131400  -10.7600 -138.3300      26.9       359       149        60
OIR    2025130    131400  -10.7600 -138.3400      26.9       359       149        60
OIR    2025130    131400  -10.7700 -136.5200      41.9        35       149        60
OIR    2025130    131400  -10.7700 -136.6600      41.8        21       149        60
OIR    2025130    131400  -10.7700 -136.6700      41.8        21       145        60
OIR    2025130    131400  -10.7700 -136.6800      41.8        21       142        60
OIR    2025130    131400  -10.7700 -136.6900      41.7        21       140        60
OIR    2025130    131400  -10.7700 -136.7000      41.7        21       140        60
OIR    2025130    131400  -10.7700 -136.7100      41.7        20       140        60
OIR    2025130    131400  -10.7700 -136.7200      41.6        20       139        60
OIR    2025130    131400  -10.7700 -136.7300      41.6        20       138        60
OIR    2025130    131400  -10.7700 -136.7400      41.5        20       136        60
OIR    2025130    131400  -10.7700 -136.7500      41.4        20       137        60
OIR    2025130    131400  -10.7700 -136.7600      41.4        20       137        60
OIR    2025130    131400  -10.7700 -136.7700      41.3        20       136        60
OIR    2025130    131400  -10.7700 -136.7800      41.2        20       134        60
OIR    2025130    131400  -10.7700 -136.7900      41.2        20       132        60
OIR    2025130    131400  -10.7700 -136.8000      41.1        19       130        60
OIR    2025130    131400  -10.7700 -136.8100      41.1        19       130        60
OIR    2025130    131400  -10.7700 -136.8200      41.0        19       128        60
OIR    2025130    131400  -10.7700 -136.8300      41.0        19       126        60
OIR    2025130    131400  -10.7700 -136.8400      40.9        19       125        60
OIR    2025130    131400  -10.7700 -136.8500      40.9        19       124        60
OIR    2025130    131400  -10.7700 -136.8600      40.9        19       126        60
OIR    2025130    131400  -10.7700 -136.8700      40.8        19       128        60
OIR    2025130    131400  -10.7700 -136.8800      40.7        19       127        60
OIR    2025130    131400  -10.7700 -136.8900      40.7        19       125        60
OIR    2025130    131400  -10.7700 -136.9000      40.6        19       121        60
OIR    2025130    131400  -10.7700 -136.9100      40.5        19       117        60
OIR    2025130    131400  -10.7700 -136.9200      40.5        19       116        60
OIR    2025130    131400  -10.7700 -136.9300      40.4        19       116        60
OIR    2025130    131400  -10.7700 -136.9400      40.4        18       116        60
OIR    2025130    131400  -10.7700 -136.9500      40.4        18       115        60
OIR    2025130    131400  -10.7700 -136.9600      40.3        18       113        60
OIR    2025130    131400  -10.7700 -136.9700      40.3        18       112        60
OIR    2025130    131400  -10.7700 -136.9800      40.3        18       111        60
OIR    2025130    131400  -10.7700 -136.9900      40.3        18       112        60
OIR    2025130    131400  -10.7700 -137.0000      40.3        18       114        60
OIR    2025130    131400  -10.7700 -137.0100      40.3        18       117        60
OIR    2025130    131400  -10.7700 -137.0200      40.3        18       122        60
OIR    2025130    131400  -10.7700 -137.0300      40.4        18       117        60
OIR    2025130    131400  -10.7700 -137.0400      40.5        17       116        60
OIR    2025130    131400  -10.7700 -137.0500      40.5        17       120        60
OIR    2025130    131400  -10.7700 -137.0600      40.5        17       124        60
OIR    2025130    131400  -10.7700 -137.0700      40.6        17       127        60
OIR    2025130    131400  -10.7700 -137.0800      40.7        17       131        60
OIR    2025130    131400  -10.7700 -137.0900      41.0        15       134        60
OIR    2025130    131400  -10.7700 -137.1000      41.3        14       135        60
OIR    2025130    131400  -10.7700 -137.1100      41.3        13       136        60
OIR    2025130    131400  -10.7700 -137.1200      41.3        12       137        60
OIR    2025130    131400  -10.7700 -137.1300      41.3        12       139        60
OIR    2025130    131400  -10.7700 -137.1400      41.3        12       138        60
OIR    2025130    131400  -10.7700 -137.1500      41.3        12       135        60
OIR    2025130    131400  -10.7700 -137.1600      41.3        11       128        60
OIR    2025130    131400  -10.7700 -137.1700      41.2        11       125        60
OIR    2025130    131400  -10.7700 -137.1800      41.2        10       122        60
OIR    2025130    131400  -10.7700 -137.1900      41.2        10       117        60
OIR    2025130    131400  -10.7700 -137.2000      41.2        10       112        60
OIR    2025130    131400  -10.7700 -137.2100      41.1         9       109        60
OIR    2025130    131400  -10.7700 -137.2200      41.1         9       108        60
OIR    2025130    131400  -10.7700 -137.2300      41.0         9       111        60
OIR    2025130    131400  -10.7700 -137.2400      40.8         8       114        60
OIR    2025130    131400  -10.7700 -137.2500      40.7         8       115        60
OIR    2025130    131400  -10.7700 -137.2600      40.6         7       115        60
OIR    2025130    131400  -10.7700 -137.2700      40.5         7       114        60
OIR    2025130    131400  -10.7700 -137.2800      40.4         6       114        60
OIR    2025130    131400  -10.7700 -137.2900      40.2         6       113        60
OIR    2025130    131400  -10.7700 -137.3000      40.2         6       113        60
OIR    2025130    131400  -10.7700 -137.3100      40.1         6       114        60
OIR    2025130    131400  -10.7700 -137.3200      40.0         5       116        60
OIR    2025130    131400  -10.7700 -137.3300      39.9         5       116        60
OIR    2025130    131400  -10.7700 -137.3400      39.7         5       116        60
OIR    2025130    131400  -10.7700 -137.3500      39.3         4       116        60
OIR    2025130    131400  -10.7700 -137.3600      38.9         3       116        60
OIR    2025130    131400  -10.7700 -137.3700      38.6         3       115        60
OIR    2025130    131400  -10.7700 -137.3800      38.2         2       113        60
OIR    2025130    131400  -10.7700 -137.3900      37.8         2       112        60
OIR    2025130    131400  -10.7700 -137.4000      37.3         1       112        60
OIR    2025130    131400  -10.7700 -137.4100      37.1         0       111        60
OIR    2025130    131400  -10.7700 -137.4200      37.0       360       109        60
OIR    2025130    131400  -10.7700 -137.4300      37.0       359       111        60
OIR    2025130    131400  -10.7700 -137.4400      37.0       358       112        60
OIR    2025130    131400  -10.7700 -137.4500      36.9       358       114        60
OIR    2025130    131400  -10.7700 -137.4600      36.9       357       116        60
OIR    2025130    131400  -10.7700 -137.4700      36.9       357       113        60
OIR    2025130    131400  -10.7700 -137.4800      36.9       356       111        60
OIR    2025130    131400  -10.7700 -137.4900      36.9       356       112        60
OIR    2025130    131400  -10.7700 -137.5000      36.9       356       114        60
OIR    2025130    131400  -10.7700 -137.5100      36.9       356       116        60
OIR    2025130    131400  -10.7700 -137.5200      36.9       356       115        60
OIR    2025130    131400  -10.7700 -137.5300      36.8       356       113        60
OIR    2025130    131400  -10.7700 -137.5400      36.8       355       113        60
OIR    2025130    131400  -10.7700 -137.5500      36.7       355       114        60
OIR    2025130    131400  -10.7700 -137.5600      36.6       355       115        60
OIR    2025130    131400  -10.7700 -137.5700      36.5       355       116        60
OIR    2025130    131400  -10.7700 -137.5800      36.5       355       120        60
OIR    2025130    131400  -10.7700 -137.5900      36.4       355       121        60
OIR    2025130    131400  -10.7700 -137.6000      36.4       355       117        60
OIR    2025130    131400  -10.7700 -137.6100      36.3       355       116        60
OIR    2025130    131400  -10.7700 -137.6200      36.3       354       119        60
OIR    2025130    131400  -10.7700 -137.6300      36.3       354       122        60
OIR    2025130    131400  -10.7700 -137.6400      36.2       354       126        60
OIR    2025130    131400  -10.7700 -137.6500      36.2       354       125        60
OIR    2025130    131400  -10.7700 -137.6600      36.1       354       124        60
OIR    2025130    131400  -10.7700 -137.6700      35.9       354       125        60
OIR    2025130    131400  -10.7700 -137.6800      35.8       354       127        60
OIR    2025130    131400  -10.7700 -137.6900      35.6       354       129        60
OIR    2025130    131400  -10.7700 -137.7000      35.4       354       131        60
OIR    2025130    131400  -10.7700 -137.7100      35.0       354       131        60
OIR    2025130    131400  -10.7700 -137.7200      34.4       354       131        60
OIR    2025130    131400  -10.7700 -137.7300      34.0       354       130        60
OIR    2025130    131400  -10.7700 -137.7400      33.6       354       130        60
OIR    2025130    131400  -10.7700 -137.7500      33.3       354       129        60
OIR    2025130    131400  -10.7700 -137.7600      33.1       353       129        60
OIR    2025130    131400  -10.7700 -137.7700      32.9       353       130        60
OIR    2025130    131400  -10.7700 -137.7800      32.7       353       129        60
OIR    2025130    131400  -10.7700 -137.7900      32.4       353       128        60
OIR    2025130    131400  -10.7700 -137.8000      32.2       353       128        60
OIR    2025130    131400  -10.7700 -137.8100      31.9       352       128        60
OIR    2025130    131400  -10.7700 -137.8200      31.5       352       130        60
OIR    2025130    131400  -10.7700 -137.8300      30.9       352       133        60
OIR    2025130    131400  -10.7700 -137.8400      29.8       352       134        60
OIR    2025130    131400  -10.7700 -137.8500      28.5       353       135        60
OIR    2025130    131400  -10.7700 -137.8600      27.7       353       134        60
OIR    2025130    131400  -10.7700 -137.8700      27.5       353       134        60
OIR    2025130    131400  -10.7700 -137.8800      27.3       353       135        60
OIR    2025130    131400  -10.7700 -137.8900      27.2       353       135        60
OIR    2025130    131400  -10.7700 -137.9000      27.1       354       136        60
OIR    2025130    131400  -10.7700 -137.9100      27.1       354       134        60
OIR    2025130    131400  -10.7700 -137.9200      27.0       354       133        60
OIR    2025130    131400  -10.7700 -137.9300      26.9       354       132        60
OIR    2025130    131400  -10.7700 -137.9400      26.9       354       130        60
OIR    2025130    131400  -10.7700 -137.9500      26.9       354       128        60
OIR    2025130    131400  -10.7700 -137.9600      26.9       354       127        60
OIR    2025130    131400  -10.7700 -137.9700      26.9       355       127        60
OIR    2025130    131400  -10.7700 -137.9800      26.9       355       127        60
OIR    2025130    131400  -10.7700 -137.9900      26.8       356       127        60
OIR    2025130    131400  -10.7700 -138.0000      26.8       356       131        60
OIR    2025130    131400  -10.7700 -138.0100      26.8       356       135        60
OIR    2025130    131400  -10.7700 -138.0200      26.8       356       135        60
OIR    2025130    131400  -10.7700 -138.0300      26.8       356       136        60
OIR    2025130    131400  -10.7700 -138.0400      26.8       356       138        60
OIR    2025130    131400  -10.7700 -138.0500      26.8       357       140        60
OIR    2025130    131400  -10.7700 -138.0600      26.8       357       140        60
OIR    2025130    131400  -10.7700 -138.0700      26.8       357       140        60
OIR    2025130    131400  -10.7700 -138.0800      26.9       357       139        60
OIR    2025130    131400  -10.7700 -138.0900      26.9       357       139        60
OIR    2025130    131400  -10.7700 -138.1000      26.9       357       140        60
OIR    2025130    131400  -10.7700 -138.1100      26.9       357       139        60
OIR    2025130    131400  -10.7700 -138.1200      26.9       358       139        60
OIR    2025130    131400  -10.7700 -138.1300      26.9       358       140        60
OIR    2025130    131400  -10.7700 -138.1400      26.9       358       141        60
OIR    2025130    131400  -10.7700 -138.1500      26.9       358       143        60
OIR    2025130    131400  -10.7700 -138.1600      26.9       358       145        60
OIR    2025130    131400  -10.7700 -138.1700      26.9       358       148        60
OIR    2025130    131400  -10.7700 -138.1800      26.9       358       149        60
OIR    2025130    131400  -10.7700 -138.1900      26.9       358       146        60
OIR    2025130    131400  -10.7700 -138.2000      26.9       358       145        60
OIR    2025130    131400  -10.7700 -138.2100      26.9       358       147        60
OIR    2025130    131400  -10.7700 -138.2200      26.9       358       145        60
OIR    2025130    131400  -10.7700 -138.2300      27.0       358       143        60
OIR    2025130    131400  -10.7700 -138.2400      27.0       358       142        60
OIR    2025130    131400  -10.7700 -138.2500      26.9       358       141        60
OIR    2025130    131400  -10.7700 -138.2600      26.9       358       143        60
OIR    2025130    131400  -10.7700 -138.2700      26.9       358       144        60
OIR    2025130    131400  -10.7700 -138.2800      26.9       358       143        60
OIR    2025130    131400  -10.7700 -138.2900      26.9       358       143        60
OIR    2025130    131400  -10.7700 -138.3000      26.9       358       144        60
OIR    2025130    131400  -10.7700 -138.3100      26.9       358       146        60
OIR    2025130    131400  -10.7700 -138.3200      26.9       358       148        60
OIR    2025130    131400  -10.7700 -138.3300      26.9       359       148        60
OIR    2025130    131400  -10.7700 -138.3400      26.9       359       149        60
OIR    2025130    131400  -10.7800 -136.5100      41.9        35       149        60
OIR    2025130    131400  -10.7800 -136.5200      41.9        35       147        60
OIR    2025130    131400  -10.7800 -136.5300      41.3        33       148        60
OIR    2025130    131400  -10.7800 -136.5400      40.8        30       150        60
OIR    2025130    131400  -10.7800 -136.6500      41.9        21       150        60
OIR    2025130    131400  -10.7800 -136.6600      41.9        21       148        60
OIR    2025130    131400  -10.7800 -136.6700      41.8        21       146        60
OIR    2025130    131400  -10.7800 -136.6800      41.8        21       142        60
OIR    2025130    131400  -10.7800 -136.6900      41.8        21       139        60
OIR    2025130    131400  -10.7800 -136.7000      41.7        20       139        60
OIR    2025130    131400  -10.7800 -136.7100      41.7        20       138        60
OIR    2025130    131400  -10.7800 -136.7200      41.6        20       139        60
OIR    2025130    131400  -10.7800 -136.7300      41.6        20       137        60
OIR    2025130    131400  -10.7800 -136.7400      41.5        20       134        60
OIR    2025130    131400  -10.7800 -136.7500      41.5        20       133        60
OIR    2025130    131400  -10.7800 -136.7600      41.4        20       132        60
OIR    2025130    131400  -10.7800 -136.7700      41.3        20       133        60
OIR    2025130    131400  -10.7800 -136.7800      41.3        20       133        60
OIR    2025130    131400  -10.7800 -136.7900      41.2        19       129        60
OIR    2025130    131400  -10.7800 -136.8000      41.2        19       128        60
OIR    2025130    131400  -10.7800 -136.8100      41.1        19       129        60
OIR    2025130    131400  -10.7800 -136.8200      41.1        19       129        60
OIR    2025130    131400  -10.7800 -136.8300      41.0        19       128        60
OIR    2025130    131400  -10.7800 -136.8400      41.0        19       127        60
OIR    2025130    131400  -10.7800 -136.8500      40.9        19       126        60
OIR    2025130    131400  -10.7800 -136.8600      40.9        19       126        60
OIR    2025130    131400  -10.7800 -136.8700      40.8        19       126        60
OIR    2025130    131400  -10.7800 -136.8800      40.8        19       126        60
OIR    2025130    131400  -10.7800 -136.8900      40.7        19       124        60
OIR    2025130    131400  -10.7800 -136.9000      40.6        19       119        60
OIR    2025130    131400  -10.7800 -136.9100      40.5        19       116        60
OIR    2025130    131400  -10.7800 -136.9200      40.5        19       115        60
OIR    2025130    131400  -10.7800 -136.9300      40.5        19       114        60
OIR    2025130    131400  -10.7800 -136.9400      40.4        18       112        60
OIR    2025130    131400  -10.7800 -136.9500      40.4        18       111        60
OIR    2025130    131400  -10.7800 -136.9600      40.4        18       110        60
OIR    2025130    131400  -10.7800 -136.9700      40.3        18       111        60
OIR    2025130    131400  -10.7800 -136.9800      40.3        18       113        60
OIR    2025130    131400  -10.7800 -136.9900      40.3        18       114        60
OIR    2025130    131400  -10.7800 -137.0000      40.3        18       115        60
OIR    2025130    131400  -10.7800 -137.0100      40.4        18       116        60
OIR    2025130    131400  -10.7800 -137.0200      40.4        18       117        60
OIR    2025130    131400  -10.7800 -137.0300      40.5        18       115        60
OIR    2025130    131400  -10.7800 -137.0400      40.6        17       114        60
OIR    2025130    131400  -10.7800 -137.0500      40.6        17       116        60
OIR    2025130    131400  -10.7800 -137.0600      40.6        17       119        60
OIR    2025130    131400  -10.7800 -137.0700      40.6        17       120        60
OIR    2025130    131400  -10.7800 -137.0800      40.7        17       122        60
OIR    2025130    131400  -10.7800 -137.0900      41.1        15       126        60
OIR    2025130    131400  -10.7800 -137.1000      41.3        13       128        60
OIR    2025130    131400  -10.7800 -137.1100      41.4        13       130        60
OIR    2025130    131400  -10.7800 -137.1200      41.4        12       130        60
OIR    2025130    131400  -10.7800 -137.1300      41.4        12       131        60
OIR    2025130    131400  -10.7800 -137.1400      41.4        12       127        60
OIR    2025130    131400  -10.7800 -137.1500      41.4        11       123        60
OIR    2025130    131400  -10.7800 -137.1600      41.3        11       120        60
OIR    2025130    131400  -10.7800 -137.1700      41.2        10       119        60
OIR    2025130    131400  -10.7800 -137.1800      41.2        10       117        60
OIR    2025130    131400  -10.7800 -137.1900      41.2        10       115        60
OIR    2025130    131400  -10.7800 -137.2000      41.1        10       111        60
OIR    2025130    131400  -10.7800 -137.2100      41.1         9       108        60
OIR    2025130    131400  -10.7800 -137.2200      41.1         9       104        60
OIR    2025130    131400  -10.7800 -137.2300      40.9         9       108        60
OIR    2025130    131400  -10.7800 -137.2400      40.8         8       110        60
OIR    2025130    131400  -10.7800 -137.2500      40.7         7       113        60
OIR    2025130    131400  -10.7800 -137.2600      40.6         7       114        60
OIR    2025130    131400  -10.7800 -137.2700      40.5         7       113        60
OIR    2025130    131400  -10.7800 -137.2800      40.4         6       113        60
OIR    2025130    131400  -10.7800 -137.2900      40.4         6       113        60
OIR    2025130    131400  -10.7800 -137.3000      40.3         6       114        60
OIR    2025130    131400  -10.7800 -137.3100      40.3         6       116        60
OIR    2025130    131400  -10.7800 -137.3200      40.2         5       116        60
OIR    2025130    131400  -10.7800 -137.3300      40.2         5       116        60
OIR    2025130    131400  -10.7800 -137.3400      40.0         5       115        60
OIR    2025130    131400  -10.7800 -137.3500      39.8         4       113        60
OIR    2025130    131400  -10.7800 -137.3600      39.5         3       115        60
OIR    2025130    131400  -10.7800 -137.3700      39.0         3       115        60
OIR    2025130    131400  -10.7800 -137.3800      38.5         2       112        60
OIR    2025130    131400  -10.7800 -137.3900      38.2         1       110        60
OIR    2025130    131400  -10.7800 -137.4000      37.7         0       111        60
OIR    2025130    131400  -10.7800 -137.4100      37.4       360       111        60
OIR    2025130    131400  -10.7800 -137.4200      37.3       359       111        60
OIR    2025130    131400  -10.7800 -137.4300      37.2       359       113        60
OIR    2025130    131400  -10.7800 -137.4400      37.2       358       115        60
OIR    2025130    131400  -10.7800 -137.4500      37.1       358       116        60
OIR    2025130    131400  -10.7800 -137.4600      37.0       357       115        60
OIR    2025130    131400  -10.7800 -137.4700      37.0       357       112        60
OIR    2025130    131400  -10.7800 -137.4800      36.9       356       110        60
OIR    2025130    131400  -10.7800 -137.4900      36.9       356       111        60
OIR    2025130    131400  -10.7800 -137.5000      36.9       356       112        60
OIR    2025130    131400  -10.7800 -137.5100      36.9       356       115        60
OIR    2025130    131400  -10.7800 -137.5200      36.9       356       115        60
OIR    2025130    131400  -10.7800 -137.5300      36.8       355       113        60
OIR    2025130    131400  -10.7800 -137.5400      36.8       355       113        60
OIR    2025130    131400  -10.7800 -137.5500      36.7       355       115        60
OIR    2025130    131400  -10.7800 -137.5600      36.7       355       115        60
OIR    2025130    131400  -10.7800 -137.5700      36.6       355       115        60
OIR    2025130    131400  -10.7800 -137.5800      36.5       355       116        60
OIR    2025130    131400  -10.7800 -137.5900      36.4       355       117        60
OIR    2025130    131400  -10.7800 -137.6000      36.4       355       116        60
OIR    2025130    131400  -10.7800 -137.6100      36.4       354       115        60
OIR    2025130    131400  -10.7800 -137.6200      36.3       354       117        60
OIR    2025130    131400  -10.7800 -137.6300      36.3       354       121        60
OIR    2025130    131400  -10.7800 -137.6400      36.3       354       125        60
OIR    2025130    131400  -10.7800 -137.6500      36.2       354       123        60
OIR    2025130    131400  -10.7800 -137.6600      36.1       354       121        60
OIR    2025130    131400  -10.7800 -137.6700      36.0       354       121        60
OIR    2025130    131400  -10.7800 -137.6800      35.9       354       123        60
OIR    2025130    131400  -10.7800 -137.6900      35.7       354       127        60
OIR    2025130    131400  -10.7800 -137.7000      35.6       354       129        60
OIR    2025130    131400  -10.7800 -137.7100      35.3       354       128        60
OIR    2025130    131400  -10.7800 -137.7200      34.8       354       127        60
OIR    2025130    131400  -10.7800 -137.7300      34.4       354       126        60
OIR    2025130    131400  -10.7800 -137.7400      33.9       354       126        60
OIR    2025130    131400  -10.7800 -137.7500      33.4       353       126        60
OIR    2025130    131400  -10.7800 -137.7600      33.1       353       127        60
OIR    2025130    131400  -10.7800 -137.7700      32.9       353       128        60
OIR    2025130    131400  -10.7800 -137.7800      32.7       353       128        60
OIR    2025130    131400  -10.7800 -137.7900      32.5       353       126        60
OIR    2025130    131400  -10.7800 -137.8000      32.2       352       127        60
OIR    2025130    131400  -10.7800 -137.8100      31.9       352       128        60
OIR    2025130    131400  -10.7800 -137.8200      31.5       352       131        60
OIR    2025130    131400  -10.7800 -137.8300      30.9       352       134        60
OIR    2025130    131400  -10.7800 -137.8400      29.6       352       134        60
OIR    2025130    131400  -10.7800 -137.8500      28.4       353       134        60
OIR    2025130    131400  -10.7800 -137.8600      27.8       353       134        60
OIR    2025130    131400  -10.7800 -137.8700      27.5       353       135        60
OIR    2025130    131400  -10.7800 -137.8800      27.4       353       135        60
OIR    2025130    131400  -10.7800 -137.8900      27.3       353       135        60
OIR    2025130    131400  -10.7800 -137.9000      27.2       353       135        60
OIR    2025130    131400  -10.7800 -137.9100      27.1       353       134        60
OIR    2025130    131400  -10.7800 -137.9200      27.1       353       134        60
OIR    2025130    131400  -10.7800 -137.9300      27.0       353       134        60
OIR    2025130    131400  -10.7800 -137.9400      27.0       353       133        60
OIR    2025130    131400  -10.7800 -137.9500      26.9       353       129        60
OIR    2025130    131400  -10.7800 -137.9600      26.9       354       128        60
OIR    2025130    131400  -10.7800 -137.9700      26.9       354       128        60
OIR    2025130    131400  -10.7800 -137.9800      26.9       354       127        60
OIR    2025130    131400  -10.7800 -137.9900      26.8       355       127        60
OIR    2025130    131400  -10.7800 -138.0000      26.8       356       130        60
OIR    2025130    131400  -10.7800 -138.0100      26.8       356       134        60
OIR    2025130    131400  -10.7800 -138.0200      26.8       356       134        60
OIR    2025130    131400  -10.7800 -138.0300      26.8       356       135        60
OIR    2025130    131400  -10.7800 -138.0400      26.8       356       137        60
OIR    2025130    131400  -10.7800 -138.0500      26.8       356       140        60
OIR    2025130    131400  -10.7800 -138.0600      26.8       357       139        60
OIR    2025130    131400  -10.7800 -138.0700      26.8       357       139        60
OIR    2025130    131400  -10.7800 -138.0800      26.9       357       137        60
OIR    2025130    131400  -10.7800 -138.0900      26.9       357       137        60
OIR    2025130    131400  -10.7800 -138.1000      26.9       357       138        60
OIR    2025130    131400  -10.7800 -138.1100      26.9       357       138        60
OIR    2025130    131400  -10.7800 -138.1200      26.9       358       138        60
OIR    2025130    131400  -10.7800 -138.1300      26.9       358       139        60
OIR    2025130    131400  -10.7800 -138.1400      26.9       358       139        60
OIR    2025130    131400  -10.7800 -138.1500      26.9       358       142        60
OIR    2025130    131400  -10.7800 -138.1600      26.9       358       145        60
OIR    2025130    131400  -10.7800 -138.1700      27.0       358       147        60
OIR    2025130    131400  -10.7800 -138.1800      27.0       358       147        60
OIR    2025130    131400  -10.7800 -138.1900      27.0       358       146        60
OIR    2025130    131400  -10.7800 -138.2000      27.0       358       147        60
OIR    2025130    131400  -10.7800 -138.2100      27.0       358       150        60
OIR    2025130    131400  -10.7800 -138.2200      26.9       358       148        60
OIR    2025130    131400  -10.7800 -138.2300      26.9       358       144        60
OIR    2025130    131400  -10.7800 -138.2400      26.9       358       142        60
OIR    2025130    131400  -10.7800 -138.2500      26.9       358       141        60
OIR    2025130    131400  -10.7800 -138.2600      26.9       358       143        60
OIR    2025130    131400  -10.7800 -138.2700      26.9       358       144        60
OIR    2025130    131400  -10.7800 -138.2800      26.9       358       143        60
OIR    2025130    131400  -10.7800 -138.2900      26.9       358       143        60
OIR    2025130    131400  -10.7800 -138.3000      26.9       358       145        60
OIR    2025130    131400  -10.7800 -138.3100      26.9       358       146        60
OIR    2025130    131400  -10.7800 -138.3200      26.9       358       146        60
OIR    2025130    131400  -10.7800 -138.3300      26.9       359       147        60
OIR    2025130    131400  -10.7800 -138.3400      26.9       359       147        60
OIR    2025130    131400  -10.7900 -136.4900      42.1        35       150        60
OIR    2025130    131400  -10.7900 -136.5000      42.0        35       148        60
OIR    2025130    131400  -10.7900 -136.5100      41.9        35       147        60
OIR    2025130    131400  -10.7900 -136.5200      42.0        34       145        60
OIR    2025130    131400  -10.7900 -136.5300      41.8        32       146        60
OIR    2025130    131400  -10.7900 -136.5400      41.3        29       147        60
OIR    2025130    131400  -10.7900 -136.5500      41.2        28       148        60
OIR    2025130    131400  -10.7900 -136.5600      41.5        28       150        60
OIR    2025130    131400  -10.7900 -136.6500      42.1        21       149        60
OIR    2025130    131400  -10.7900 -136.6600      42.0        21       148        60
OIR    2025130    131400  -10.7900 -136.6700      41.9        21       146        60
OIR    2025130    131400  -10.7900 -136.6800      41.9        21       142        60
OIR    2025130    131400  -10.7900 -136.6900      41.8        20       139        60
OIR    2025130    131400  -10.7900 -136.7000      41.8        20       138        60
OIR    2025130    131400  -10.7900 -136.7100      41.7        20       137        60
OIR    2025130    131400  -10.7900 -136.7200      41.7        20       138        60
OIR    2025130    131400  -10.7900 -136.7300      41.6        20       136        60
OIR    2025130    131400  -10.7900 -136.7400      41.5        20       134        60
OIR    2025130    131400  -10.7900 -136.7500      41.5        20       132        60
OIR    2025130    131400  -10.7900 -136.7600      41.4        20       130        60
OIR    2025130    131400  -10.7900 -136.7700      41.3        20       131        60
OIR    2025130    131400  -10.7900 -136.7800      41.3        19       132        60
OIR    2025130    131400  -10.7900 -136.7900      41.2        19       129        60
OIR    2025130    131400  -10.7900 -136.8000      41.2        19       128        60
OIR    2025130    131400  -10.7900 -136.8100      41.1        19       128        60
OIR    2025130    131400  -10.7900 -136.8200      41.1        19       128        60
OIR    2025130    131400  -10.7900 -136.8300      41.0        19       129        60
OIR    2025130    131400  -10.7900 -136.8400      41.0        19       128        60
OIR    2025130    131400  -10.7900 -136.8500      40.9        19       126        60
OIR    2025130    131400  -10.7900 -136.8600      40.9        19       125        60
OIR    2025130    131400  -10.7900 -136.8700      40.8        19       124        60
OIR    2025130    131400  -10.7900 -136.8800      40.8        19       123        60
OIR    2025130    131400  -10.7900 -136.8900      40.7        19       122        60
OIR    2025130    131400  -10.7900 -136.9000      40.6        19       116        60
OIR    2025130    131400  -10.7900 -136.9100      40.6        19       115        60
OIR    2025130    131400  -10.7900 -136.9200      40.5        19       114        60
OIR    2025130    131400  -10.7900 -136.9300      40.5        18       113        60
OIR    2025130    131400  -10.7900 -136.9400      40.5        18       111        60
OIR    2025130    131400  -10.7900 -136.9500      40.5        18       110        60
OIR    2025130    131400  -10.7900 -136.9600      40.4        18       110        60
OIR    2025130    131400  -10.7900 -136.9700      40.4        18       112        60
OIR    2025130    131400  -10.7900 -136.9800      40.4        18       114        60
OIR    2025130    131400  -10.7900 -136.9900      40.4        18       115        60
OIR    2025130    131400  -10.7900 -137.0000      40.4        18       116        60
OIR    2025130    131400  -10.7900 -137.0100      40.4        18       117        60
OIR    2025130    131400  -10.7900 -137.0200      40.5        18       119        60
OIR    2025130    131400  -10.7900 -137.0300      40.6        17       115        60
OIR    2025130    131400  -10.7900 -137.0400      40.6        17       113        60
OIR    2025130    131400  -10.7900 -137.0500      40.6        17       114        60
OIR    2025130    131400  -10.7900 -137.0600      40.6        17       115        60
OIR    2025130    131400  -10.7900 -137.0700      40.7        17       115        60
OIR    2025130    131400  -10.7900 -137.0800      40.8        16       116        60
OIR    2025130    131400  -10.7900 -137.0900      41.0        15       121        60
OIR    2025130    131400  -10.7900 -137.1000      41.3        13       124        60
OIR    2025130    131400  -10.7900 -137.1100      41.5        12       126        60
OIR    2025130    131400  -10.7900 -137.1200      41.5        12       126        60
OIR    2025130    131400  -10.7900 -137.1300      41.5        12       126        60
OIR    2025130    131400  -10.7900 -137.1400      41.5        11       121        60
OIR    2025130    131400  -10.7900 -137.1500      41.3        11       116        60
OIR    2025130    131400  -10.7900 -137.1600      41.2        10       116        60
OIR    2025130    131400  -10.7900 -137.1700      41.2        10       116        60
OIR    2025130    131400  -10.7900 -137.1800      41.2        10       116        60
OIR    2025130    131400  -10.7900 -137.1900      41.2        10       115        60
OIR    2025130    131400  -10.7900 -137.2000      41.1         9       111        60
OIR    2025130    131400  -10.7900 -137.2100      41.1         9       109        60
OIR    2025130    131400  -10.7900 -137.2200      41.1         9       107        60
OIR    2025130    131400  -10.7900 -137.2300      40.9         9       108        60
OIR    2025130    131400  -10.7900 -137.2400      40.8         8       109        60
OIR    2025130    131400  -10.7900 -137.2500      40.7         7       112        60
OIR    2025130    131400  -10.7900 -137.2600      40.6         7       113        60
OIR    2025130    131400  -10.7900 -137.2700      40.6         6       113        60
OIR    2025130    131400  -10.7900 -137.2800      40.5         6       113        60
OIR    2025130    131400  -10.7900 -137.2900      40.4         6       114        60
OIR    2025130    131400  -10.7900 -137.3000      40.4         6       115        60
OIR    2025130    131400  -10.7900 -137.3100      40.3         6       117        60
OIR    2025130    131400  -10.7900 -137.3200      40.3         5       116        60
OIR    2025130    131400  -10.7900 -137.3300      40.3         5       115        60
OIR    2025130    131400  -10.7900 -137.3400      40.3         5       114        60
OIR    2025130    131400  -10.7900 -137.3500      40.0         4       113        60
OIR    2025130    131400  -10.7900 -137.3600      39.8         3       115        60
OIR    2025130    131400  -10.7900 -137.3700      39.5         3       115        60
OIR    2025130    131400  -10.7900 -137.3800      38.8         2       112        60
OIR    2025130    131400  -10.7900 -137.3900      38.5         1       110        60
OIR    2025130    131400  -10.7900 -137.4000      38.1         0       111        60
OIR    2025130    131400  -10.7900 -137.4100      37.7       360       111        60
OIR    2025130    131400  -10.7900 -137.4200      37.5       359       110        60
OIR    2025130    131400  -10.7900 -137.4300      37.4       359       113        60
OIR    2025130    131400  -10.7900 -137.4400      37.4       358       116        60
OIR    2025130    131400  -10.7900 -137.4500      37.2       358       116        60
OIR    2025130    131400  -10.7900 -137.4600      37.1       357       115        60
OIR    2025130    131400  -10.7900 -137.4700      37.0       357       112        60
OIR    2025130    131400  -10.7900 -137.4800      37.0       356       110        60
OIR    2025130    131400  -10.7900 -137.4900      36.9       356       111        60
OIR    2025130    131400  -10.7900 -137.5000      36.9       356       113        60
OIR    2025130    131400  -10.7900 -137.5100      36.9       356       115        60
OIR    2025130    131400  -10.7900 -137.5200      36.9       356       115        60
OIR    2025130    131400  -10.7900 -137.5300      36.8       355       112        60
OIR    2025130    131400  -10.7900 -137.5400      36.8       355       113        60
OIR    2025130    131400  -10.7900 -137.5500      36.8       355       115        60
OIR    2025130    131400  -10.7900 -137.5600      36.7       355       115        60
OIR    2025130    131400  -10.7900 -137.5700      36.6       355       115        60
OIR    2025130    131400  -10.7900 -137.5800      36.5       355       116        60
OIR    2025130    131400  -10.7900 -137.5900      36.5       355       116        60
OIR    2025130    131400  -10.7900 -137.6000      36.4       354       116        60
OIR    2025130    131400  -10.7900 -137.6100      36.4       354       116        60
OIR    2025130    131400  -10.7900 -137.6200      36.4       354       116        60
OIR    2025130    131400  -10.7900 -137.6300      36.4       354       120        60
OIR    2025130    131400  -10.7900 -137.6400      36.3       354       122        60
OIR    2025130    131400  -10.7900 -137.6500      36.2       354       121        60
OIR    2025130    131400  -10.7900 -137.6600      36.2       354       119        60
OIR    2025130    131400  -10.7900 -137.6700      36.1       354       120        60
OIR    2025130    131400  -10.7900 -137.6800      35.9       354       121        60
OIR    2025130    131400  -10.7900 -137.6900      35.8       354       124        60
OIR    2025130    131400  -10.7900 -137.7000      35.7       354       125        60
OIR    2025130    131400  -10.7900 -137.7100      35.4       354       124        60
OIR    2025130    131400  -10.7900 -137.7200      35.0       353       124        60
OIR    2025130    131400  -10.7900 -137.7300      34.6       353       123        60
OIR    2025130    131400  -10.7900 -137.7400      34.0       353       124        60
OIR    2025130    131400  -10.7900 -137.7500      33.4       353       125        60
OIR    2025130    131400  -10.7900 -137.7600      33.1       353       126        60
OIR    2025130    131400  -10.7900 -137.7700      32.9       353       127        60
OIR    2025130    131400  -10.7900 -137.7800      32.7       353       127        60
OIR    2025130    131400  -10.7900 -137.7900      32.5       353       125        60
OIR    2025130    131400  -10.7900 -137.8000      32.3       352       126        60
OIR    2025130    131400  -10.7900 -137.8100      31.9       352       127        60
OIR    2025130    131400  -10.7900 -137.8200      31.5       352       131        60
OIR    2025130    131400  -10.7900 -137.8300      30.8       352       134        60
OIR    2025130    131400  -10.7900 -137.8400      29.4       352       134        60
OIR    2025130    131400  -10.7900 -137.8500      28.3       353       135        60
OIR    2025130    131400  -10.7900 -137.8600      27.8       353       135        60
OIR    2025130    131400  -10.7900 -137.8700      27.6       353       135        60
OIR    2025130    131400  -10.7900 -137.8800      27.4       353       135        60
OIR    2025130    131400  -10.7900 -137.8900      27.3       353       135        60
OIR    2025130    131400  -10.7900 -137.9000      27.2       353       135        60
OIR    2025130    131400  -10.7900 -137.9100      27.1       353       135        60
OIR    2025130    131400  -10.7900 -137.9200      27.1       353       134        60
OIR    2025130    131400  -10.7900 -137.9300      27.0       353       135        60
OIR    2025130    131400  -10.7900 -137.9400      27.0       353       135        60
OIR    2025130    131400  -10.7900 -137.9500      26.9       353       131        60
OIR    2025130    131400  -10.7900 -137.9600      26.9       353       129        60
OIR    2025130    131400  -10.7900 -137.9700      26.9       353       128        60
OIR    2025130    131400  -10.7900 -137.9800      26.8       354       127        60
OIR    2025130    131400  -10.7900 -137.9900      26.8       355       126        60
OIR    2025130    131400  -10.7900 -138.0000      26.8       355       129        60
OIR    2025130    131400  -10.7900 -138.0100      26.8       355       133        60
OIR    2025130    131400  -10.7900 -138.0200      26.8       356       134        60
OIR    2025130    131400  -10.7900 -138.0300      26.8       356       135        60
OIR    2025130    131400  -10.7900 -138.0400      26.8       356       137        60
OIR    2025130    131400  -10.7900 -138.0500      26.8       356       139        60
OIR    2025130    131400  -10.7900 -138.0600      26.8       356       138        60
OIR    2025130    131400  -10.7900 -138.0700      26.8       357       137        60
OIR    2025130    131400  -10.7900 -138.0800      26.9       357       136        60
OIR    2025130    131400  -10.7900 -138.0900      26.9       357       135        60
OIR    2025130    131400  -10.7900 -138.1000      26.9       357       136        60
OIR    2025130    131400  -10.7900 -138.1100      26.9       357       137        60
OIR    2025130    131400  -10.7900 -138.1200      26.9       358       137        60
OIR    2025130    131400  -10.7900 -138.1300      26.9       358       138        60
OIR    2025130    131400  -10.7900 -138.1400      26.9       358       138        60
OIR    2025130    131400  -10.7900 -138.1500      26.9       358       141        60
OIR    2025130    131400  -10.7900 -138.1600      27.0       358       144        60
OIR    2025130    131400  -10.7900 -138.1700      27.0       358       145        60
OIR    2025130    131400  -10.7900 -138.1800      27.0       358       146        60
OIR    2025130    131400  -10.7900 -138.1900      27.0       358       146        60
OIR    2025130    131400  -10.7900 -138.2000      27.0       358       147        60
OIR    2025130    131400  -10.7900 -138.2100      27.0       358       149        60
OIR    2025130    131400  -10.7900 -138.2200      27.0       358       148        60
OIR    2025130    131400  -10.7900 -138.2300      26.9       358       147        60
OIR    2025130    131400  -10.7900 -138.2400      26.9       358       145        60
OIR    2025130    131400  -10.7900 -138.2500      26.9       358       143        60
OIR    2025130    131400  -10.7900 -138.2600      26.9       358       142        60
OIR    2025130    131400  -10.7900 -138.2700      26.9       358       142        60
OIR    2025130    131400  -10.7900 -138.2800      26.9       358       143        60
OIR    2025130    131400  -10.7900 -138.2900      26.9       358       143        60
OIR    2025130    131400  -10.7900 -138.3000      26.9       358       145        60
OIR    2025130    131400  -10.7900 -138.3100      26.9       358       146        60
OIR    2025130    131400  -10.7900 -138.3200      26.9       359       146        60
OIR    2025130    131400  -10.7900 -138.3300      26.9       359       147        60
OIR    2025130    131400  -10.7900 -138.3400      26.9       359       147        60
OIR    2025130    131400  -10.7900 -138.3500      26.9       359       149        60
OIR    2025130    131400  -10.8000 -136.5000      42.5        34       150        60
OIR    2025130    131400  -10.8000 -136.5100      42.6        34       147        60
OIR    2025130    131400  -10.8000 -136.5200      43.2        33       145        60
OIR    2025130    131400  -10.8000 -136.5300      43.2        31       146        60
OIR    2025130    131400  -10.8000 -136.5400      42.2        29       147        60
OIR    2025130    131400  -10.8000 -136.5500      42.1        28       149        60
OIR    2025130    131400  -10.8000 -136.5600      42.5        27       151        60
OIR    2025130    131400  -10.8000 -136.6600      42.3        21       149        60
OIR    2025130    131400  -10.8000 -136.6700      42.1        21       145        60
OIR    2025130    131400  -10.8000 -136.6800      42.0        21       142        60
OIR    2025130    131400  -10.8000 -136.6900      41.9        20       140        60
OIR    2025130    131400  -10.8000 -136.7000      41.8        20       139        60
OIR    2025130    131400  -10.8000 -136.7100      41.8        20       138        60
OIR    2025130    131400  -10.8000 -136.7200      41.7        20       138        60
OIR    2025130    131400  -10.8000 -136.7300      41.6        20       137        60
OIR    2025130    131400  -10.8000 -136.7400      41.6        20       135        60
OIR    2025130    131400  -10.8000 -136.7500      41.5        20       133        60
OIR    2025130    131400  -10.8000 -136.7600      41.4        20       131        60
OIR    2025130    131400  -10.8000 -136.7700      41.4        19       132        60
OIR    2025130    131400  -10.8000 -136.7800      41.3        19       132        60
OIR    2025130    131400  -10.8000 -136.7900      41.3        19       131        60
OIR    2025130    131400  -10.8000 -136.8000      41.2        19       130        60
OIR    2025130    131400  -10.8000 -136.8100      41.2        19       128        60
OIR    2025130    131400  -10.8000 -136.8200      41.1        19       128        60
OIR    2025130    131400  -10.8000 -136.8300      41.1        19       129        60
OIR    2025130    131400  -10.8000 -136.8400      41.0        19       128        60
OIR    2025130    131400  -10.8000 -136.8500      41.0        19       126        60
OIR    2025130    131400  -10.8000 -136.8600      40.9        19       124        60
OIR    2025130    131400  -10.8000 -136.8700      40.9        19       122        60
OIR    2025130    131400  -10.8000 -136.8800      40.8        19       119        60
OIR    2025130    131400  -10.8000 -136.8900      40.7        19       117        60
OIR    2025130    131400  -10.8000 -136.9000      40.7        19       117        60
OIR    2025130    131400  -10.8000 -136.9100      40.6        19       116        60
OIR    2025130    131400  -10.8000 -136.9200      40.6        18       115        60
OIR    2025130    131400  -10.8000 -136.9300      40.5        18       114        60
OIR    2025130    131400  -10.8000 -136.9400      40.5        18       114        60
OIR    2025130    131400  -10.8000 -136.9500      40.5        18       114        60
OIR    2025130    131400  -10.8000 -136.9600      40.5        18       115        60
OIR    2025130    131400  -10.8000 -136.9700      40.4        18       115        60
OIR    2025130    131400  -10.8000 -136.9800      40.4        18       115        60
OIR    2025130    131400  -10.8000 -136.9900      40.4        18       116        60
OIR    2025130    131400  -10.8000 -137.0000      40.5        18       120        60
OIR    2025130    131400  -10.8000 -137.0100      40.5        18       121        60
OIR    2025130    131400  -10.8000 -137.0200      40.6        17       123        60
OIR    2025130    131400  -10.8000 -137.0300      40.6        17       116        60
OIR    2025130    131400  -10.8000 -137.0400      40.6        17       112        60
OIR    2025130    131400  -10.8000 -137.0500      40.6        17       110        60
OIR    2025130    131400  -10.8000 -137.0600      40.6        17       111        60
OIR    2025130    131400  -10.8000 -137.0700      40.8        17       112        60
OIR    2025130    131400  -10.8000 -137.0800      40.9        16       114        60
OIR    2025130    131400  -10.8000 -137.0900      41.1        14       116        60
OIR    2025130    131400  -10.8000 -137.1000      41.4        13       121        60
OIR    2025130    131400  -10.8000 -137.1100      41.6        12       124        60
OIR    2025130    131400  -10.8000 -137.1200      41.6        12       124        60
OIR    2025130    131400  -10.8000 -137.1300      41.6        11       123        60
OIR    2025130    131400  -10.8000 -137.1400      41.5        11       117        60
OIR    2025130    131400  -10.8000 -137.1500      41.3        10       115        60
OIR    2025130    131400  -10.8000 -137.1600      41.2        10       113        60
OIR    2025130    131400  -10.8000 -137.1700      41.2        10       114        60
OIR    2025130    131400  -10.8000 -137.1800      41.2        10       116        60
OIR    2025130    131400  -10.8000 -137.1900      41.2        10       115        60
OIR    2025130    131400  -10.8000 -137.2000      41.1         9       111        60
OIR    2025130    131400  -10.8000 -137.2100      41.1         9       111        60
OIR    2025130    131400  -10.8000 -137.2200      41.1         9       112        60
OIR    2025130    131400  -10.8000 -137.2300      40.9         8       110        60
OIR    2025130    131400  -10.8000 -137.2400      40.8         8       108        60
OIR    2025130    131400  -10.8000 -137.2500      40.7         7       111        60
OIR    2025130    131400  -10.8000 -137.2600      40.6         7       113        60
OIR    2025130    131400  -10.8000 -137.2700      40.6         6       113        60
OIR    2025130    131400  -10.8000 -137.2800      40.6         6       114        60
OIR    2025130    131400  -10.8000 -137.2900      40.5         6       115        60
OIR    2025130    131400  -10.8000 -137.3000      40.5         6       116        60
OIR    2025130    131400  -10.8000 -137.3100      40.4         6       117        60
OIR    2025130    131400  -10.8000 -137.3200      40.4         5       115        60
OIR    2025130    131400  -10.8000 -137.3300      40.4         5       112        60
OIR    2025130    131400  -10.8000 -137.3400      40.4         5       113        60
OIR    2025130    131400  -10.8000 -137.3500      40.2         4       115        60
OIR    2025130    131400  -10.8000 -137.3600      40.0         4       116        60
OIR    2025130    131400  -10.8000 -137.3700      39.7         3       115        60
OIR    2025130    131400  -10.8000 -137.3800      39.4         2       112        60
OIR    2025130    131400  -10.8000 -137.3900      38.9         1       109        60
OIR    2025130    131400  -10.8000 -137.4000      38.3         0       110        60
OIR    2025130    131400  -10.8000 -137.4100      37.9       359       110        60
OIR    2025130    131400  -10.8000 -137.4200      37.7       359       108        60
OIR    2025130    131400  -10.8000 -137.4300      37.6       359       111        60
OIR    2025130    131400  -10.8000 -137.4400      37.5       358       115        60
OIR    2025130    131400  -10.8000 -137.4500      37.4       358       116        60
OIR    2025130    131400  -10.8000 -137.4600      37.2       357       116        60
OIR    2025130    131400  -10.8000 -137.4700      37.1       356       112        60
OIR    2025130    131400  -10.8000 -137.4800      37.0       356       111        60
OIR    2025130    131400  -10.8000 -137.4900      37.0       356       113        60
OIR    2025130    131400  -10.8000 -137.5000      37.0       356       115        60
OIR    2025130    131400  -10.8000 -137.5100      37.0       356       116        60
OIR    2025130    131400  -10.8000 -137.5200      36.9       355       115        60
OIR    2025130    131400  -10.8000 -137.5300      36.9       355       112        60
OIR    2025130    131400  -10.8000 -137.5400      36.8       355       113        60
OIR    2025130    131400  -10.8000 -137.5500      36.8       355       115        60
OIR    2025130    131400  -10.8000 -137.5600      36.7       355       116        60
OIR    2025130    131400  -10.8000 -137.5700      36.7       355       116        60
OIR    2025130    131400  -10.8000 -137.5800      36.6       355       117        60
OIR    2025130    131400  -10.8000 -137.5900      36.5       354       117        60
OIR    2025130    131400  -10.8000 -137.6000      36.5       354       117        60
OIR    2025130    131400  -10.8000 -137.6100      36.4       354       117        60
OIR    2025130    131400  -10.8000 -137.6200      36.4       354       117        60
OIR    2025130    131400  -10.8000 -137.6300      36.4       354       117        60
OIR    2025130    131400  -10.8000 -137.6400      36.3       354       117        60
OIR    2025130    131400  -10.8000 -137.6500      36.3       354       117        60
OIR    2025130    131400  -10.8000 -137.6600      36.2       354       119        60
OIR    2025130    131400  -10.8000 -137.6700      36.1       354       119        60
OIR    2025130    131400  -10.8000 -137.6800      36.0       354       119        60
OIR    2025130    131400  -10.8000 -137.6900      35.9       354       120        60
OIR    2025130    131400  -10.8000 -137.7000      35.7       353       121        60
OIR    2025130    131400  -10.8000 -137.7100      35.6       353       121        60
OIR    2025130    131400  -10.8000 -137.7200      35.2       353       121        60
OIR    2025130    131400  -10.8000 -137.7300      34.6       353       121        60
OIR    2025130    131400  -10.8000 -137.7400      34.1       353       122        60
OIR    2025130    131400  -10.8000 -137.7500      33.4       353       125        60
OIR    2025130    131400  -10.8000 -137.7600      33.1       353       126        60
OIR    2025130    131400  -10.8000 -137.7700      32.9       353       126        60
OIR    2025130    131400  -10.8000 -137.7800      32.7       352       126        60
OIR    2025130    131400  -10.8000 -137.7900      32.5       352       125        60
OIR    2025130    131400  -10.8000 -137.8000      32.3       352       126        60
OIR    2025130    131400  -10.8000 -137.8100      32.0       352       126        60
OIR    2025130    131400  -10.8000 -137.8200      31.5       352       131        60
OIR    2025130    131400  -10.8000 -137.8300      30.6       352       135        60
OIR    2025130    131400  -10.8000 -137.8400      29.2       352       136        60
OIR    2025130    131400  -10.8000 -137.8500      28.3       353       136        60
OIR    2025130    131400  -10.8000 -137.8600      27.9       353       136        60
OIR    2025130    131400  -10.8000 -137.8700      27.6       353       136        60
OIR    2025130    131400  -10.8000 -137.8800      27.4       353       136        60
OIR    2025130    131400  -10.8000 -137.8900      27.3       353       135        60
OIR    2025130    131400  -10.8000 -137.9000      27.2       353       134        60
OIR    2025130    131400  -10.8000 -137.9100      27.1       353       135        60
OIR    2025130    131400  -10.8000 -137.9200      27.1       353       135        60
OIR    2025130    131400  -10.8000 -137.9300      27.0       353       137        60
OIR    2025130    131400  -10.8000 -137.9400      27.0       353       137        60
OIR    2025130    131400  -10.8000 -137.9500      26.9       353       133        60
OIR    2025130    131400  -10.8000 -137.9600      26.9       353       130        60
OIR    2025130    131400  -10.8000 -137.9700      26.9       353       128        60
OIR    2025130    131400  -10.8000 -137.9800      26.8       354       125        60
OIR    2025130    131400  -10.8000 -137.9900      26.8       354       125        60
OIR    2025130    131400  -10.8000 -138.0000      26.8       355       128        60
OIR    2025130    131400  -10.8000 -138.0100      26.8       355       132        60
OIR    2025130    131400  -10.8000 -138.0200      26.8       355       134        60
OIR    2025130    131400  -10.8000 -138.0300      26.8       356       135        60
OIR    2025130    131400  -10.8000 -138.0400      26.8       356       137        60
OIR    2025130    131400  -10.8000 -138.0500      26.8       356       137        60
OIR    2025130    131400  -10.8000 -138.0600      26.8       356       137        60
OIR    2025130    131400  -10.8000 -138.0700      26.8       356       136        60
OIR    2025130    131400  -10.8000 -138.0800      26.8       357       135        60
OIR    2025130    131400  -10.8000 -138.0900      26.9       357       134        60
OIR    2025130    131400  -10.8000 -138.1000      26.9       357       133        60
OIR    2025130    131400  -10.8000 -138.1100      26.9       357       134        60
OIR    2025130    131400  -10.8000 -138.1200      26.9       357       136        60
OIR    2025130    131400  -10.8000 -138.1300      26.9       358       137        60
OIR    2025130    131400  -10.8000 -138.1400      26.9       358       137        60
OIR    2025130    131400  -10.8000 -138.1500      27.0       358       140        60
OIR    2025130    131400  -10.8000 -138.1600      27.0       358       142        60
OIR    2025130    131400  -10.8000 -138.1700      27.0       358       144        60
OIR    2025130    131400  -10.8000 -138.1800      27.0       358       146        60
OIR    2025130    131400  -10.8000 -138.1900      27.0       358       147        60
OIR    2025130    131400  -10.8000 -138.2000      27.0       358       147        60
OIR    2025130    131400  -10.8000 -138.2100      27.0       358       145        60
OIR    2025130    131400  -10.8000 -138.2200      27.0       358       148        60
OIR    2025130    131400  -10.8000 -138.2300      26.9       358       151        60
OIR    2025130    131400  -10.8000 -138.2400      26.9       358       148        60
OIR    2025130    131400  -10.8000 -138.2500      26.9       358       144        60
OIR    2025130    131400  -10.8000 -138.2600      26.9       358       142        60
OIR    2025130    131400  -10.8000 -138.2700      26.9       358       140        60
OIR    2025130    131400  -10.8000 -138.2800      26.9       358       141        60
OIR    2025130    131400  -10.8000 -138.2900      26.9       358       143        60
OIR    2025130    131400  -10.8000 -138.3000      26.9       358       145        60
OIR    2025130    131400  -10.8000 -138.3100      26.9       358       146        60
OIR    2025130    131400  -10.8000 -138.3200      26.9       359       147        60
OIR    2025130    131400  -10.8000 -138.3300      26.9       359       147        60
OIR    2025130    131400  -10.8000 -138.3400      26.9       359       146        60
OIR    2025130    131400  -10.8000 -138.3500      26.9       359       148        60
OIR    2025130    131400  -10.8100 -136.5100      44.6        32       149        60
OIR    2025130    131400  -10.8100 -136.5200      44.8        31       147        60
OIR    2025130    131400  -10.8100 -136.5300      45.0        30       146        60
OIR    2025130    131400  -10.8100 -136.5400      44.2        29       146        60
OIR    2025130    131400  -10.8100 -136.5500      43.9        28       147        60
OIR    2025130    131400  -10.8100 -136.5600      44.4        27       149        60
OIR    2025130    131400  -10.8100 -136.5700      44.9        26       149        60
OIR    2025130    131400  -10.8100 -136.6600      43.3        21       149        60
OIR    2025130    131400  -10.8100 -136.6700      42.6        21       145        60
OIR    2025130    131400  -10.8100 -136.6800      42.3        20       144        60
OIR    2025130    131400  -10.8100 -136.6900      42.0        20       142        60
OIR    2025130    131400  -10.8100 -136.7000      41.9        20       140        60
OIR    2025130    131400  -10.8100 -136.7100      41.8        20       139        60
OIR    2025130    131400  -10.8100 -136.7200      41.7        20       138        60
OIR    2025130    131400  -10.8100 -136.7300      41.7        20       137        60
OIR    2025130    131400  -10.8100 -136.7400      41.6        20       136        60
OIR    2025130    131400  -10.8100 -136.7500      41.5        20       134        60
OIR    2025130    131400  -10.8100 -136.7600      41.5        19       132        60
OIR    2025130    131400  -10.8100 -136.7700      41.4        19       132        60
OIR    2025130    131400  -10.8100 -136.7800      41.4        19       132        60
OIR    2025130    131400  -10.8100 -136.7900      41.3        19       131        60
OIR    2025130    131400  -10.8100 -136.8000      41.2        19       130        60
OIR    2025130    131400  -10.8100 -136.8100      41.2        19       129        60
OIR    2025130    131400  -10.8100 -136.8200      41.1        19       129        60
OIR    2025130    131400  -10.8100 -136.8300      41.1        19       129        60
OIR    2025130    131400  -10.8100 -136.8400      41.0        19       128        60
OIR    2025130    131400  -10.8100 -136.8500      41.0        19       127        60
OIR    2025130    131400  -10.8100 -136.8600      40.9        19       124        60
OIR    2025130    131400  -10.8100 -136.8700      40.9        19       122        60
OIR    2025130    131400  -10.8100 -136.8800      40.8        19       121        60
OIR    2025130    131400  -10.8100 -136.8900      40.7        19       120        60
OIR    2025130    131400  -10.8100 -136.9000      40.7        19       120        60
OIR    2025130    131400  -10.8100 -136.9100      40.6        18       117        60
OIR    2025130    131400  -10.8100 -136.9200      40.6        18       116        60
OIR    2025130    131400  -10.8100 -136.9300      40.6        18       115        60
OIR    2025130    131400  -10.8100 -136.9400      40.5        18       115        60
OIR    2025130    131400  -10.8100 -136.9500      40.5        18       116        60
OIR    2025130    131400  -10.8100 -136.9600      40.5        18       120        60
OIR    2025130    131400  -10.8100 -136.9700      40.5        18       119        60
OIR    2025130    131400  -10.8100 -136.9800      40.5        18       117        60
OIR    2025130    131400  -10.8100 -136.9900      40.5        18       120        60
OIR    2025130    131400  -10.8100 -137.0000      40.6        18       122        60
OIR    2025130    131400  -10.8100 -137.0100      40.6        17       122        60
OIR    2025130    131400  -10.8100 -137.0200      40.6        17       121        60
OIR    2025130    131400  -10.8100 -137.0300      40.6        17       116        60
OIR    2025130    131400  -10.8100 -137.0400      40.6        17       112        60
OIR    2025130    131400  -10.8100 -137.0500      40.6        17       110        60
OIR    2025130    131400  -10.8100 -137.0600      40.7        17       111        60
OIR    2025130    131400  -10.8100 -137.0700      40.8        16       113        60
OIR    2025130    131400  -10.8100 -137.0800      41.0        16       115        60
OIR    2025130    131400  -10.8100 -137.0900      41.3        14       116        60
OIR    2025130    131400  -10.8100 -137.1000      41.5        13       120        60
OIR    2025130    131400  -10.8100 -137.1100      41.6        12       123        60
OIR    2025130    131400  -10.8100 -137.1200      41.6        11       122        60
OIR    2025130    131400  -10.8100 -137.1300      41.6        11       120        60
OIR    2025130    131400  -10.8100 -137.1400      41.5        11       116        60
OIR    2025130    131400  -10.8100 -137.1500      41.3        10       114        60
OIR    2025130    131400  -10.8100 -137.1600      41.2        10       113        60
OIR    2025130    131400  -10.8100 -137.1700      41.2        10       113        60
OIR    2025130    131400  -10.8100 -137.1800      41.2        10       113        60
OIR    2025130    131400  -10.8100 -137.1900      41.1         9       113        60
OIR    2025130    131400  -10.8100 -137.2000      41.1         9       112        60
OIR    2025130    131400  -10.8100 -137.2100      41.1         9       113        60
OIR    2025130    131400  -10.8100 -137.2200      41.1         9       114        60
OIR    2025130    131400  -10.8100 -137.2300      40.9         8       112        60
OIR    2025130    131400  -10.8100 -137.2400      40.8         8       110        60
OIR    2025130    131400  -10.8100 -137.2500      40.7         7       112        60
OIR    2025130    131400  -10.8100 -137.2600      40.6         7       114        60
OIR    2025130    131400  -10.8100 -137.2700      40.6         6       113        60
OIR    2025130    131400  -10.8100 -137.2800      40.6         6       114        60
OIR    2025130    131400  -10.8100 -137.2900      40.6         6       116        60
OIR    2025130    131400  -10.8100 -137.3000      40.5         6       116        60
OIR    2025130    131400  -10.8100 -137.3100      40.5         6       117        60
OIR    2025130    131400  -10.8100 -137.3200      40.4         5       115        60
OIR    2025130    131400  -10.8100 -137.3300      40.4         5       112        60
OIR    2025130    131400  -10.8100 -137.3400      40.5         5       115        60
OIR    2025130    131400  -10.8100 -137.3500      40.5         5       116        60
OIR    2025130    131400  -10.8100 -137.3600      40.3         4       117        60
OIR    2025130    131400  -10.8100 -137.3700      39.9         4       116        60
OIR    2025130    131400  -10.8100 -137.3800      39.6         3       114        60
OIR    2025130    131400  -10.8100 -137.3900      39.2         2       112        60
OIR    2025130    131400  -10.8100 -137.4000      38.4       360       112        60
OIR    2025130    131400  -10.8100 -137.4100      38.0       359       111        60
OIR    2025130    131400  -10.8100 -137.4200      37.9       359       110        60
OIR    2025130    131400  -10.8100 -137.4300      37.8       358       111        60
OIR    2025130    131400  -10.8100 -137.4400      37.7       358       113        60
OIR    2025130    131400  -10.8100 -137.4500      37.6       357       115        60
OIR    2025130    131400  -10.8100 -137.4600      37.4       357       116        60
OIR    2025130    131400  -10.8100 -137.4700      37.2       356       114        60
OIR    2025130    131400  -10.8100 -137.4800      37.1       356       113        60
OIR    2025130    131400  -10.8100 -137.4900      37.1       356       115        60
OIR    2025130    131400  -10.8100 -137.5000      37.0       356       116        60
OIR    2025130    131400  -10.8100 -137.5100      37.0       356       115        60
OIR    2025130    131400  -10.8100 -137.5200      37.0       355       114        60
OIR    2025130    131400  -10.8100 -137.5300      36.9       355       112        60
OIR    2025130    131400  -10.8100 -137.5400      36.9       355       113        60
OIR    2025130    131400  -10.8100 -137.5500      36.8       355       115        60
OIR    2025130    131400  -10.8100 -137.5600      36.8       355       116        60
OIR    2025130    131400  -10.8100 -137.5700      36.7       355       117        60
OIR    2025130    131400  -10.8100 -137.5800      36.6       355       117        60
OIR    2025130    131400  -10.8100 -137.5900      36.5       354       117        60
OIR    2025130    131400  -10.8100 -137.6000      36.5       354       117        60
OIR    2025130    131400  -10.8100 -137.6100      36.5       354       116        60
OIR    2025130    131400  -10.8100 -137.6200      36.4       354       116        60
OIR    2025130    131400  -10.8100 -137.6300      36.4       354       116        60
OIR    2025130    131400  -10.8100 -137.6400      36.3       354       116        60
OIR    2025130    131400  -10.8100 -137.6500      36.3       354       119        60
OIR    2025130    131400  -10.8100 -137.6600      36.2       354       120        60
OIR    2025130    131400  -10.8100 -137.6700      36.1       354       120        60
OIR    2025130    131400  -10.8100 -137.6800      36.0       353       117        60
OIR    2025130    131400  -10.8100 -137.6900      35.9       353       117        60
OIR    2025130    131400  -10.8100 -137.7000      35.8       353       117        60
OIR    2025130    131400  -10.8100 -137.7100      35.6       353       119        60
OIR    2025130    131400  -10.8100 -137.7200      35.1       353       120        60
OIR    2025130    131400  -10.8100 -137.7300      34.4       353       120        60
OIR    2025130    131400  -10.8100 -137.7400      33.9       353       123        60
OIR    2025130    131400  -10.8100 -137.7500      33.3       353       126        60
OIR    2025130    131400  -10.8100 -137.7600      33.0       352       127        60
OIR    2025130    131400  -10.8100 -137.7700      32.8       352       127        60
OIR    2025130    131400  -10.8100 -137.7800      32.6       352       128        60
OIR    2025130    131400  -10.8100 -137.7900      32.5       352       128        60
OIR    2025130    131400  -10.8100 -137.8000      32.4       352       128        60
OIR    2025130    131400  -10.8100 -137.8100      32.1       352       129        60
OIR    2025130    131400  -10.8100 -137.8200      31.4       352       131        60
OIR    2025130    131400  -10.8100 -137.8300      30.3       353       134        60
OIR    2025130    131400  -10.8100 -137.8400      29.0       353       136        60
OIR    2025130    131400  -10.8100 -137.8500      28.3       353       136        60
OIR    2025130    131400  -10.8100 -137.8600      27.8       353       137        60
OIR    2025130    131400  -10.8100 -137.8700      27.6       353       136        60
OIR    2025130    131400  -10.8100 -137.8800      27.4       353       136        60
OIR    2025130    131400  -10.8100 -137.8900      27.3       353       135        60
OIR    2025130    131400  -10.8100 -137.9000      27.2       353       134        60
OIR    2025130    131400  -10.8100 -137.9100      27.1       353       134        60
OIR    2025130    131400  -10.8100 -137.9200      27.1       353       135        60
OIR    2025130    131400  -10.8100 -137.9300      27.0       353       137        60
OIR    2025130    131400  -10.8100 -137.9400      27.0       353       137        60
OIR    2025130    131400  -10.8100 -137.9500      26.9       353       133        60
OIR    2025130    131400  -10.8100 -137.9600      26.9       353       131        60
OIR    2025130    131400  -10.8100 -137.9700      26.9       353       130        60
OIR    2025130    131400  -10.8100 -137.9800      26.8       353       129        60
OIR    2025130    131400  -10.8100 -137.9900      26.8       354       130        60
OIR    2025130    131400  -10.8100 -138.0000      26.8       354       132        60
OIR    2025130    131400  -10.8100 -138.0100      26.8       355       133        60
OIR    2025130    131400  -10.8100 -138.0200      26.8       355       135        60
OIR    2025130    131400  -10.8100 -138.0300      26.8       355       136        60
OIR    2025130    131400  -10.8100 -138.0400      26.8       356       137        60
OIR    2025130    131400  -10.8100 -138.0500      26.8       356       138        60
OIR    2025130    131400  -10.8100 -138.0600      26.8       356       137        60
OIR    2025130    131400  -10.8100 -138.0700      26.8       356       137        60
OIR    2025130    131400  -10.8100 -138.0800      26.8       356       136        60
OIR    2025130    131400  -10.8100 -138.0900      26.8       357       136        60
OIR    2025130    131400  -10.8100 -138.1000      26.9       357       136        60
OIR    2025130    131400  -10.8100 -138.1100      26.9       357       136        60
OIR    2025130    131400  -10.8100 -138.1200      26.9       357       135        60
OIR    2025130    131400  -10.8100 -138.1300      26.9       358       136        60
OIR    2025130    131400  -10.8100 -138.1400      26.9       358       137        60
OIR    2025130    131400  -10.8100 -138.1500      26.9       358       138        60
OIR    2025130    131400  -10.8100 -138.1600      27.0       358       140        60
OIR    2025130    131400  -10.8100 -138.1700      27.0       358       142        60
OIR    2025130    131400  -10.8100 -138.1800      27.0       358       144        60
OIR    2025130    131400  -10.8100 -138.1900      27.0       358       146        60
OIR    2025130    131400  -10.8100 -138.2000      27.0       358       148        60
OIR    2025130    131400  -10.8100 -138.2100      26.9       358       148        60
OIR    2025130    131400  -10.8100 -138.2200      26.9       358       150        60
OIR    2025130    131400  -10.8100 -138.2400      26.9       358       149        60
OIR    2025130    131400  -10.8100 -138.2500      26.9       358       146        60
OIR    2025130    131400  -10.8100 -138.2600      26.9       358       144        60
OIR    2025130    131400  -10.8100 -138.2700      26.9       358       143        60
OIR    2025130    131400  -10.8100 -138.2800      26.9       358       144        60
OIR    2025130    131400  -10.8100 -138.2900      26.9       358       144        60
OIR    2025130    131400  -10.8100 -138.3000      26.9       358       145        60
OIR    2025130    131400  -10.8100 -138.3100      26.9       358       147        60
OIR    2025130    131400  -10.8100 -138.3200      26.9       359       148        60
OIR    2025130    131400  -10.8100 -138.3300      26.9       359       149        60
OIR    2025130    131400  -10.8200 -136.5200      45.7        30       150        60
OIR    2025130    131400  -10.8200 -136.5300      45.8        30       146        60
OIR    2025130    131400  -10.8200 -136.5400      45.6        29       143        60
OIR    2025130    131400  -10.8200 -136.5500      45.2        28       143        60
OIR    2025130    131400  -10.8200 -136.5600      45.5        27       143        60
OIR    2025130    131400  -10.8200 -136.5700      45.6        26       145        60
OIR    2025130    131400  -10.8200 -136.5800      45.6        24       148        60
OIR    2025130    131400  -10.8200 -136.6600      45.2        21       150        60
OIR    2025130    131400  -10.8200 -136.6700      44.3        21       147        60
OIR    2025130    131400  -10.8200 -136.6800      43.1        21       145        60
OIR    2025130    131400  -10.8200 -136.6900      42.4        20       143        60
OIR    2025130    131400  -10.8200 -136.7000      42.1        20       142        60
OIR    2025130    131400  -10.8200 -136.7100      41.9        20       141        60
OIR    2025130    131400  -10.8200 -136.7200      41.8        20       139        60
OIR    2025130    131400  -10.8200 -136.7300      41.7        20       137        60
OIR    2025130    131400  -10.8200 -136.7400      41.6        20       135        60
OIR    2025130    131400  -10.8200 -136.7500      41.6        19       134        60
OIR    2025130    131400  -10.8200 -136.7600      41.5        19       133        60
OIR    2025130    131400  -10.8200 -136.7700      41.5        19       132        60
OIR    2025130    131400  -10.8200 -136.7800      41.4        19       131        60
OIR    2025130    131400  -10.8200 -136.7900      41.3        19       130        60
OIR    2025130    131400  -10.8200 -136.8000      41.2        19       131        60
OIR    2025130    131400  -10.8200 -136.8100      41.2        19       131        60
OIR    2025130    131400  -10.8200 -136.8200      41.1        19       131        60
OIR    2025130    131400  -10.8200 -136.8300      41.1        19       130        60
OIR    2025130    131400  -10.8200 -136.8400      41.0        19       129        60
OIR    2025130    131400  -10.8200 -136.8500      41.0        19       128        60
OIR    2025130    131400  -10.8200 -136.8600      41.0        19       126        60
OIR    2025130    131400  -10.8200 -136.8700      40.9        19       123        60
OIR    2025130    131400  -10.8200 -136.8800      40.8        19       124        60
OIR    2025130    131400  -10.8200 -136.8900      40.8        19       125        60
OIR    2025130    131400  -10.8200 -136.9000      40.7        18       122        60
OIR    2025130    131400  -10.8200 -136.9100      40.6        18       120        60
OIR    2025130    131400  -10.8200 -136.9200      40.6        18       117        60
OIR    2025130    131400  -10.8200 -136.9300      40.6        18       116        60
OIR    2025130    131400  -10.8200 -136.9400      40.6        18       115        60
OIR    2025130    131400  -10.8200 -136.9500      40.5        18       119        60
OIR    2025130    131400  -10.8200 -136.9600      40.5        18       124        60
OIR    2025130    131400  -10.8200 -136.9700      40.5        18       124        60
OIR    2025130    131400  -10.8200 -136.9800      40.5        18       123        60
OIR    2025130    131400  -10.8200 -136.9900      40.5        18       123        60
OIR    2025130    131400  -10.8200 -137.0000      40.6        17       123        60
OIR    2025130    131400  -10.8200 -137.0100      40.6        17       120        60
OIR    2025130    131400  -10.8200 -137.0200      40.6        17       117        60
OIR    2025130    131400  -10.8200 -137.0300      40.6        17       115        60
OIR    2025130    131400  -10.8200 -137.0400      40.6        17       113        60
OIR    2025130    131400  -10.8200 -137.0500      40.6        17       112        60
OIR    2025130    131400  -10.8200 -137.0600      40.7        17       113        60
OIR    2025130    131400  -10.8200 -137.0700      40.8        16       114        60
OIR    2025130    131400  -10.8200 -137.0800      41.1        15       116        60
OIR    2025130    131400  -10.8200 -137.0900      41.4        14       119        60
OIR    2025130    131400  -10.8200 -137.1000      41.6        13       121        60
OIR    2025130    131400  -10.8200 -137.1100      41.7        12       122        60
OIR    2025130    131400  -10.8200 -137.1200      41.6        11       120        60
OIR    2025130    131400  -10.8200 -137.1300      41.6        11       117        60
OIR    2025130    131400  -10.8200 -137.1400      41.4        10       116        60
OIR    2025130    131400  -10.8200 -137.1500      41.3        10       115        60
OIR    2025130    131400  -10.8200 -137.1600      41.2        10       114        60
OIR    2025130    131400  -10.8200 -137.1700      41.2        10       112        60
OIR    2025130    131400  -10.8200 -137.1800      41.2        10       111        60
OIR    2025130    131400  -10.8200 -137.1900      41.1         9       111        60
OIR    2025130    131400  -10.8200 -137.2000      41.1         9       113        60
OIR    2025130    131400  -10.8200 -137.2100      41.1         9       114        60
OIR    2025130    131400  -10.8200 -137.2200      41.1         9       115        60
OIR    2025130    131400  -10.8200 -137.2300      41.0         9       114        60
OIR    2025130    131400  -10.8200 -137.2400      40.9         8       113        60
OIR    2025130    131400  -10.8200 -137.2500      40.8         7       114        60
OIR    2025130    131400  -10.8200 -137.2600      40.7         7       114        60
OIR    2025130    131400  -10.8200 -137.2700      40.7         7       114        60
OIR    2025130    131400  -10.8200 -137.2800      40.7         6       115        60
OIR    2025130    131400  -10.8200 -137.2900      40.6         6       116        60
OIR    2025130    131400  -10.8200 -137.3000      40.6         6       117        60
OIR    2025130    131400  -10.8200 -137.3100      40.6         6       117        60
OIR    2025130    131400  -10.8200 -137.3200      40.5         5       115        60
OIR    2025130    131400  -10.8200 -137.3300      40.5         5       113        60
OIR    2025130    131400  -10.8200 -137.3400      40.5         5       116        60
OIR    2025130    131400  -10.8200 -137.3500      40.5         5       120        60
OIR    2025130    131400  -10.8200 -137.3600      40.5         5       120        60
OIR    2025130    131400  -10.8200 -137.3700      40.4         4       119        60
OIR    2025130    131400  -10.8200 -137.3800      40.1         3       117        60
OIR    2025130    131400  -10.8200 -137.3900      39.4         2       116        60
OIR    2025130    131400  -10.8200 -137.4000      38.4       360       114        60
OIR    2025130    131400  -10.8200 -137.4100      38.2       359       113        60
OIR    2025130    131400  -10.8200 -137.4200      38.1       359       112        60
OIR    2025130    131400  -10.8200 -137.4300      37.9       358       111        60
OIR    2025130    131400  -10.8200 -137.4400      37.8       358       110        60
OIR    2025130    131400  -10.8200 -137.4500      37.7       357       112        60
OIR    2025130    131400  -10.8200 -137.4600      37.6       357       116        60
OIR    2025130    131400  -10.8200 -137.4700      37.4       357       116        60
OIR    2025130    131400  -10.8200 -137.4800      37.2       356       116        60
OIR    2025130    131400  -10.8200 -137.4900      37.2       356       116        60
OIR    2025130    131400  -10.8200 -137.5000      37.1       356       116        60
OIR    2025130    131400  -10.8200 -137.5100      37.0       356       115        60
OIR    2025130    131400  -10.8200 -137.5200      37.0       355       113        60
OIR    2025130    131400  -10.8200 -137.5300      36.9       355       112        60
OIR    2025130    131400  -10.8200 -137.5400      36.9       355       113        60
OIR    2025130    131400  -10.8200 -137.5500      36.8       355       114        60
OIR    2025130    131400  -10.8200 -137.5600      36.8       355       116        60
OIR    2025130    131400  -10.8200 -137.5700      36.7       355       117        60
OIR    2025130    131400  -10.8200 -137.5800      36.6       354       117        60
OIR    2025130    131400  -10.8200 -137.5900      36.6       354       116        60
OIR    2025130    131400  -10.8200 -137.6000      36.5       354       116        60
OIR    2025130    131400  -10.8200 -137.6100      36.5       354       116        60
OIR    2025130    131400  -10.8200 -137.6200      36.4       354       116        60
OIR    2025130    131400  -10.8200 -137.6300      36.4       354       116        60
OIR    2025130    131400  -10.8200 -137.6400      36.4       354       117        60
OIR    2025130    131400  -10.8200 -137.6500      36.3       354       120        60
OIR    2025130    131400  -10.8200 -137.6600      36.2       354       122        60
OIR    2025130    131400  -10.8200 -137.6700      36.1       354       121        60
OIR    2025130    131400  -10.8200 -137.6800      36.0       353       117        60
OIR    2025130    131400  -10.8200 -137.6900      35.9       353       116        60
OIR    2025130    131400  -10.8200 -137.7000      35.8       353       116        60
OIR    2025130    131400  -10.8200 -137.7100      35.4       353       117        60
OIR    2025130    131400  -10.8200 -137.7200      34.8       353       120        60
OIR    2025130    131400  -10.8200 -137.7300      34.2       353       121        60
OIR    2025130    131400  -10.8200 -137.7400      33.7       353       124        60
OIR    2025130    131400  -10.8200 -137.7500      33.2       352       127        60
OIR    2025130    131400  -10.8200 -137.7600      33.0       352       128        60
OIR    2025130    131400  -10.8200 -137.7700      32.8       352       129        60
OIR    2025130    131400  -10.8200 -137.7800      32.7       352       130        60
OIR    2025130    131400  -10.8200 -137.7900      32.6       352       132        60
OIR    2025130    131400  -10.8200 -137.8000      32.4       352       132        60
OIR    2025130    131400  -10.8200 -137.8100      32.0       352       131        60
OIR    2025130    131400  -10.8200 -137.8200      31.2       352       132        60
OIR    2025130    131400  -10.8200 -137.8300      29.9       353       132        60
OIR    2025130    131400  -10.8200 -137.8400      28.8       353       135        60
OIR    2025130    131400  -10.8200 -137.8500      28.2       352       136        60
OIR    2025130    131400  -10.8200 -137.8600      27.8       353       137        60
OIR    2025130    131400  -10.8200 -137.8700      27.6       353       136        60
OIR    2025130    131400  -10.8200 -137.8800      27.4       353       135        60
OIR    2025130    131400  -10.8200 -137.8900      27.3       353       134        60
OIR    2025130    131400  -10.8200 -137.9000      27.2       353       132        60
OIR    2025130    131400  -10.8200 -137.9100      27.1       353       133        60
OIR    2025130    131400  -10.8200 -137.9200      27.0       353       134        60
OIR    2025130    131400  -10.8200 -137.9300      27.0       353       136        60
OIR    2025130    131400  -10.8200 -137.9400      26.9       353       136        60
OIR    2025130    131400  -10.8200 -137.9500      26.9       353       133        60
OIR    2025130    131400  -10.8200 -137.9600      26.9       353       132        60
OIR    2025130    131400  -10.8200 -137.9700      26.8       353       132        60
OIR    2025130    131400  -10.8200 -137.9800      26.8       353       133        60
OIR    2025130    131400  -10.8200 -137.9900      26.8       353       135        60
OIR    2025130    131400  -10.8200 -138.0000      26.8       354       135        60
OIR    2025130    131400  -10.8200 -138.0100      26.8       354       135        60
OIR    2025130    131400  -10.8200 -138.0200      26.8       355       136        60
OIR    2025130    131400  -10.8200 -138.0300      26.7       355       136        60
OIR    2025130    131400  -10.8200 -138.0400      26.7       355       138        60
OIR    2025130    131400  -10.8200 -138.0500      26.8       356       139        60
OIR    2025130    131400  -10.8200 -138.0600      26.8       356       138        60
OIR    2025130    131400  -10.8200 -138.0700      26.8       356       137        60
OIR    2025130    131400  -10.8200 -138.0800      26.8       356       137        60
OIR    2025130    131400  -10.8200 -138.0900      26.8       356       137        60
OIR    2025130    131400  -10.8200 -138.1000      26.8       357       138        60
OIR    2025130    131400  -10.8200 -138.1100      26.9       357       137        60
OIR    2025130    131400  -10.8200 -138.1200      26.9       357       135        60
OIR    2025130    131400  -10.8200 -138.1300      26.9       357       136        60
OIR    2025130    131400  -10.8200 -138.1400      26.9       358       136        60
OIR    2025130    131400  -10.8200 -138.1500      26.9       358       137        60
OIR    2025130    131400  -10.8200 -138.1600      27.0       358       138        60
OIR    2025130    131400  -10.8200 -138.1700      27.0       358       140        60
OIR    2025130    131400  -10.8200 -138.1800      27.0       358       143        60
OIR    2025130    131400  -10.8200 -138.1900      27.0       358       146        60
OIR    2025130    131400  -10.8200 -138.2000      26.9       358       148        60
OIR    2025130    131400  -10.8200 -138.2100      26.9       358       149        60
OIR    2025130    131400  -10.8200 -138.2500      26.9       358       147        60
OIR    2025130    131400  -10.8200 -138.2600      26.9       358       147        60
OIR    2025130    131400  -10.8200 -138.2700      26.9       358       146        60
OIR    2025130    131400  -10.8200 -138.2800      26.9       358       145        60
OIR    2025130    131400  -10.8200 -138.2900      26.9       358       146        60
OIR    2025130    131400  -10.8200 -138.3000      26.9       358       146        60
OIR    2025130    131400  -10.8200 -138.3100      26.9       358       148        60
OIR    2025130    131400  -10.8300 -136.5300      46.0        30       147        60
OIR    2025130    131400  -10.8300 -136.5400      46.0        30       144        60
OIR    2025130    131400  -10.8300 -136.5500      46.0        29       143        60
OIR    2025130    131400  -10.8300 -136.5600      46.0        27       142        60
OIR    2025130    131400  -10.8300 -136.5700      45.9        26       143        60
OIR    2025130    131400  -10.8300 -136.5800      45.8        24       146        60
OIR    2025130    131400  -10.8300 -136.6100      46.0        22       149        60
OIR    2025130    131400  -10.8300 -136.6200      45.9        22       149        60
OIR    2025130    131400  -10.8300 -136.6300      45.9        22       150        60
OIR    2025130    131400  -10.8300 -136.6400      45.8        22       150        60
OIR    2025130    131400  -10.8300 -136.6500      45.7        22       149        60
OIR    2025130    131400  -10.8300 -136.6600      45.6        22       148        60
OIR    2025130    131400  -10.8300 -136.6700      45.2        21       146        60
OIR    2025130    131400  -10.8300 -136.6800      44.3        21       145        60
OIR    2025130    131400  -10.8300 -136.6900      43.1        20       144        60
OIR    2025130    131400  -10.8300 -136.7000      42.4        20       143        60
OIR    2025130    131400  -10.8300 -136.7100      42.0        20       142        60
OIR    2025130    131400  -10.8300 -136.7200      41.9        20       140        60
OIR    2025130    131400  -10.8300 -136.7300      41.8        20       137        60
OIR    2025130    131400  -10.8300 -136.7400      41.7        19       134        60
OIR    2025130    131400  -10.8300 -136.7500      41.6        19       133        60
OIR    2025130    131400  -10.8300 -136.7600      41.5        19       132        60
OIR    2025130    131400  -10.8300 -136.7700      41.5        19       130        60
OIR    2025130    131400  -10.8300 -136.7800      41.4        19       128        60
OIR    2025130    131400  -10.8300 -136.7900      41.4        19       128        60
OIR    2025130    131400  -10.8300 -136.8000      41.3        19       128        60
OIR    2025130    131400  -10.8300 -136.8100      41.2        19       129        60
OIR    2025130    131400  -10.8300 -136.8200      41.2        19       130        60
OIR    2025130    131400  -10.8300 -136.8300      41.1        19       130        60
OIR    2025130    131400  -10.8300 -136.8400      41.1        19       129        60
OIR    2025130    131400  -10.8300 -136.8500      41.0        19       128        60
OIR    2025130    131400  -10.8300 -136.8600      41.0        19       127        60
OIR    2025130    131400  -10.8300 -136.8700      40.9        19       126        60
OIR    2025130    131400  -10.8300 -136.8800      40.9        19       127        60
OIR    2025130    131400  -10.8300 -136.8900      40.8        19       127        60
OIR    2025130    131400  -10.8300 -136.9000      40.7        18       124        60
OIR    2025130    131400  -10.8300 -136.9100      40.6        18       121        60
OIR    2025130    131400  -10.8300 -136.9200      40.6        18       120        60
OIR    2025130    131400  -10.8300 -136.9300      40.6        18       117        60
OIR    2025130    131400  -10.8300 -136.9400      40.6        18       116        60
OIR    2025130    131400  -10.8300 -136.9500      40.6        18       121        60
OIR    2025130    131400  -10.8300 -136.9600      40.5        18       126        60
OIR    2025130    131400  -10.8300 -136.9700      40.5        18       124        60
OIR    2025130    131400  -10.8300 -136.9800      40.5        18       123        60
OIR    2025130    131400  -10.8300 -136.9900      40.5        18       121        60
OIR    2025130    131400  -10.8300 -137.0000      40.6        17       120        60
OIR    2025130    131400  -10.8300 -137.0100      40.6        17       116        60
OIR    2025130    131400  -10.8300 -137.0200      40.6        17       114        60
OIR    2025130    131400  -10.8300 -137.0300      40.6        17       112        60
OIR    2025130    131400  -10.8300 -137.0400      40.6        17       111        60
OIR    2025130    131400  -10.8300 -137.0500      40.7        17       112        60
OIR    2025130    131400  -10.8300 -137.0600      40.7        16       113        60
OIR    2025130    131400  -10.8300 -137.0700      40.9        16       115        60
OIR    2025130    131400  -10.8300 -137.0800      41.2        15       116        60
OIR    2025130    131400  -10.8300 -137.0900      41.4        13       117        60
OIR    2025130    131400  -10.8300 -137.1000      41.6        12       117        60
OIR    2025130    131400  -10.8300 -137.1100      41.7        12       117        60
OIR    2025130    131400  -10.8300 -137.1200      41.6        11       116        60
OIR    2025130    131400  -10.8300 -137.1300      41.6        10       116        60
OIR    2025130    131400  -10.8300 -137.1400      41.4        10       115        60
OIR    2025130    131400  -10.8300 -137.1500      41.3        10       114        60
OIR    2025130    131400  -10.8300 -137.1600      41.2        10       113        60
OIR    2025130    131400  -10.8300 -137.1700      41.2        10       111        60
OIR    2025130    131400  -10.8300 -137.1800      41.1         9       110        60
OIR    2025130    131400  -10.8300 -137.1900      41.1         9       111        60
OIR    2025130    131400  -10.8300 -137.2000      41.1         9       114        60
OIR    2025130    131400  -10.8300 -137.2100      41.1         9       115        60
OIR    2025130    131400  -10.8300 -137.2200      41.1         9       115        60
OIR    2025130    131400  -10.8300 -137.2300      41.0         9       113        60
OIR    2025130    131400  -10.8300 -137.2400      41.0         8       111        60
OIR    2025130    131400  -10.8300 -137.2500      40.9         8       113        60
OIR    2025130    131400  -10.8300 -137.2600      40.8         7       114        60
OIR    2025130    131400  -10.8300 -137.2700      40.7         7       114        60
OIR    2025130    131400  -10.8300 -137.2800      40.7         6       114        60
OIR    2025130    131400  -10.8300 -137.2900      40.7         6       116        60
OIR    2025130    131400  -10.8300 -137.3000      40.7         6       116        60
OIR    2025130    131400  -10.8300 -137.3100      40.6         6       116        60
OIR    2025130    131400  -10.8300 -137.3200      40.6         5       116        60
OIR    2025130    131400  -10.8300 -137.3300      40.5         5       115        60
OIR    2025130    131400  -10.8300 -137.3400      40.5         5       116        60
OIR    2025130    131400  -10.8300 -137.3500      40.5         5       116        60
OIR    2025130    131400  -10.8300 -137.3600      40.5         5       116        60
OIR    2025130    131400  -10.8300 -137.3700      40.4         4       116        60
OIR    2025130    131400  -10.8300 -137.3800      40.2         4       116        60
OIR    2025130    131400  -10.8300 -137.3900      39.7         2       116        60
OIR    2025130    131400  -10.8300 -137.4000      38.4       359       116        60
OIR    2025130    131400  -10.8300 -137.4100      38.3       359       116        60
OIR    2025130    131400  -10.8300 -137.4200      38.2       358       113        60
OIR    2025130    131400  -10.8300 -137.4300      38.0       358       111        60
OIR    2025130    131400  -10.8300 -137.4400      37.9       358       110        60
OIR    2025130    131400  -10.8300 -137.4500      37.9       357       111        60
OIR    2025130    131400  -10.8300 -137.4600      37.7       357       113        60
OIR    2025130    131400  -10.8300 -137.4700      37.6       357       116        60
OIR    2025130    131400  -10.8300 -137.4800      37.4       356       116        60
OIR    2025130    131400  -10.8300 -137.4900      37.3       356       116        60
OIR    2025130    131400  -10.8300 -137.5000      37.2       356       115        60
OIR    2025130    131400  -10.8300 -137.5100      37.1       355       115        60
OIR    2025130    131400  -10.8300 -137.5200      37.1       355       114        60
OIR    2025130    131400  -10.8300 -137.5300      37.0       355       114        60
OIR    2025130    131400  -10.8300 -137.5400      36.9       355       114        60
OIR    2025130    131400  -10.8300 -137.5500      36.9       355       114        60
OIR    2025130    131400  -10.8300 -137.5600      36.8       355       116        60
OIR    2025130    131400  -10.8300 -137.5700      36.7       355       116        60
OIR    2025130    131400  -10.8300 -137.5800      36.6       354       116        60
OIR    2025130    131400  -10.8300 -137.5900      36.6       354       116        60
OIR    2025130    131400  -10.8300 -137.6000      36.5       354       116        60
OIR    2025130    131400  -10.8300 -137.6100      36.5       354       116        60
OIR    2025130    131400  -10.8300 -137.6200      36.5       354       115        60
OIR    2025130    131400  -10.8300 -137.6300      36.4       354       116        60
OIR    2025130    131400  -10.8300 -137.6400      36.4       354       117        60
OIR    2025130    131400  -10.8300 -137.6500      36.3       354       119        60
OIR    2025130    131400  -10.8300 -137.6600      36.2       354       121        60
OIR    2025130    131400  -10.8300 -137.6700      36.1       353       120        60
OIR    2025130    131400  -10.8300 -137.6800      36.0       353       117        60
OIR    2025130    131400  -10.8300 -137.6900      35.9       353       117        60
OIR    2025130    131400  -10.8300 -137.7000      35.6       353       119        60
OIR    2025130    131400  -10.8300 -137.7100      35.1       353       120        60
OIR    2025130    131400  -10.8300 -137.7200      34.5       353       121        60
OIR    2025130    131400  -10.8300 -137.7300      34.1       353       122        60
OIR    2025130    131400  -10.8300 -137.7400      33.5       352       124        60
OIR    2025130    131400  -10.8300 -137.7500      33.1       352       127        60
OIR    2025130    131400  -10.8300 -137.7600      32.9       352       128        60
OIR    2025130    131400  -10.8300 -137.7700      32.8       352       129        60
OIR    2025130    131400  -10.8300 -137.7800      32.7       352       130        60
OIR    2025130    131400  -10.8300 -137.7900      32.5       352       131        60
OIR    2025130    131400  -10.8300 -137.8000      32.2       352       131        60
OIR    2025130    131400  -10.8300 -137.8100      31.8       352       131        60
OIR    2025130    131400  -10.8300 -137.8200      30.9       352       132        60
OIR    2025130    131400  -10.8300 -137.8300      29.6       353       133        60
OIR    2025130    131400  -10.8300 -137.8400      28.7       353       134        60
OIR    2025130    131400  -10.8300 -137.8500      28.1       352       135        60
OIR    2025130    131400  -10.8300 -137.8600      27.8       353       136        60
OIR    2025130    131400  -10.8300 -137.8700      27.5       353       136        60
OIR    2025130    131400  -10.8300 -137.8800      27.4       353       134        60
OIR    2025130    131400  -10.8300 -137.8900      27.3       353       133        60
OIR    2025130    131400  -10.8300 -137.9000      27.2       353       132        60
OIR    2025130    131400  -10.8300 -137.9100      27.1       353       133        60
OIR    2025130    131400  -10.8300 -137.9200      27.0       353       134        60
OIR    2025130    131400  -10.8300 -137.9300      27.0       353       135        60
OIR    2025130    131400  -10.8300 -137.9400      26.9       353       135        60
OIR    2025130    131400  -10.8300 -137.9500      26.9       353       132        60
OIR    2025130    131400  -10.8300 -137.9600      26.9       353       132        60
OIR    2025130    131400  -10.8300 -137.9700      26.8       353       134        60
OIR    2025130    131400  -10.8300 -137.9800      26.8       353       135        60
OIR    2025130    131400  -10.8300 -137.9900      26.8       353       136        60
OIR    2025130    131400  -10.8300 -138.0000      26.8       353       135        60
OIR    2025130    131400  -10.8300 -138.0100      26.7       354       133        60
OIR    2025130    131400  -10.8300 -138.0200      26.7       355       134        60
OIR    2025130    131400  -10.8300 -138.0300      26.7       355       134        60
OIR    2025130    131400  -10.8300 -138.0400      26.7       355       136        60
OIR    2025130    131400  -10.8300 -138.0500      26.7       355       137        60
OIR    2025130    131400  -10.8300 -138.0600      26.8       356       137        60
OIR    2025130    131400  -10.8300 -138.0700      26.8       356       137        60
OIR    2025130    131400  -10.8300 -138.0800      26.8       356       137        60
OIR    2025130    131400  -10.8300 -138.0900      26.8       356       137        60
OIR    2025130    131400  -10.8300 -138.1000      26.8       356       138        60
OIR    2025130    131400  -10.8300 -138.1100      26.8       357       137        60
OIR    2025130    131400  -10.8300 -138.1200      26.8       357       136        60
OIR    2025130    131400  -10.8300 -138.1300      26.9       357       135        60
OIR    2025130    131400  -10.8300 -138.1400      26.9       357       135        60
OIR    2025130    131400  -10.8300 -138.1500      26.9       358       136        60
OIR    2025130    131400  -10.8300 -138.1600      26.9       358       137        60
OIR    2025130    131400  -10.8300 -138.1700      27.0       358       139        60
OIR    2025130    131400  -10.8300 -138.1800      27.0       358       141        60
OIR    2025130    131400  -10.8300 -138.1900      26.9       358       143        60
OIR    2025130    131400  -10.8300 -138.2000      26.9       358       145        60
OIR    2025130    131400  -10.8300 -138.2100      26.9       358       147        60
OIR    2025130    131400  -10.8300 -138.2200      26.9       358       149        60
OIR    2025130    131400  -10.8300 -138.2400      26.9       358       149        60
OIR    2025130    131400  -10.8300 -138.2500      26.9       358       147        60
OIR    2025130    131400  -10.8300 -138.2600      26.9       358       146        60
OIR    2025130    131400  -10.8300 -138.2700      26.9       358       145        60
OIR    2025130    131400  -10.8300 -138.2800      26.9       358       146        60
OIR    2025130    131400  -10.8300 -138.2900      26.9       358       147        60
OIR    2025130    131400  -10.8300 -138.3000      26.9       358       147        60
OIR    2025130    131400  -10.8300 -138.3100      26.9       358       148        60
OIR    2025130    131400  -10.8400 -136.5300      46.2        30       149        60
OIR    2025130    131400  -10.8400 -136.5400      46.2        30       146        60
OIR    2025130    131400  -10.8400 -136.5500      46.2        29       144        60
OIR    2025130    131400  -10.8400 -136.5600      46.3        27       143        60
OIR    2025130    131400  -10.8400 -136.5700      46.3        25       140        60
OIR    2025130    131400  -10.8400 -136.5800      46.2        23       143        60
OIR    2025130    131400  -10.8400 -136.5900      46.1        23       150        60
OIR    2025130    131400  -10.8400 -136.6000      46.1        22       149        60
OIR    2025130    131400  -10.8400 -136.6100      46.0        22       146        60
OIR    2025130    131400  -10.8400 -136.6200      45.9        22       145        60
OIR    2025130    131400  -10.8400 -136.6300      45.9        22       146        60
OIR    2025130    131400  -10.8400 -136.6400      45.8        22       146        60
OIR    2025130    131400  -10.8400 -136.6500      45.8        22       146        60
OIR    2025130    131400  -10.8400 -136.6600      45.7        22       145        60
OIR    2025130    131400  -10.8400 -136.6700      45.5        21       144        60
OIR    2025130    131400  -10.8400 -136.6800      45.0        21       144        60
OIR    2025130    131400  -10.8400 -136.6900      43.8        20       143        60
OIR    2025130    131400  -10.8400 -136.7000      42.8        20       144        60
OIR    2025130    131400  -10.8400 -136.7100      42.2        20       142        60
OIR    2025130    131400  -10.8400 -136.7200      42.0        20       140        60
OIR    2025130    131400  -10.8400 -136.7300      41.8        19       137        60
OIR    2025130    131400  -10.8400 -136.7400      41.7        19       133        60
OIR    2025130    131400  -10.8400 -136.7500      41.6        19       132        60
OIR    2025130    131400  -10.8400 -136.7600      41.6        19       130        60
OIR    2025130    131400  -10.8400 -136.7700      41.5        19       128        60
OIR    2025130    131400  -10.8400 -136.7800      41.5        19       125        60
OIR    2025130    131400  -10.8400 -136.7900      41.4        19       125        60
OIR    2025130    131400  -10.8400 -136.8000      41.3        19       126        60
OIR    2025130    131400  -10.8400 -136.8100      41.2        19       127        60
OIR    2025130    131400  -10.8400 -136.8200      41.2        19       129        60
OIR    2025130    131400  -10.8400 -136.8300      41.1        19       130        60
OIR    2025130    131400  -10.8400 -136.8400      41.1        19       129        60
OIR    2025130    131400  -10.8400 -136.8500      41.0        19       127        60
OIR    2025130    131400  -10.8400 -136.8600      41.0        19       127        60
OIR    2025130    131400  -10.8400 -136.8700      40.9        19       128        60
OIR    2025130    131400  -10.8400 -136.8800      40.9        19       129        60
OIR    2025130    131400  -10.8400 -136.8900      40.8        19       130        60
OIR    2025130    131400  -10.8400 -136.9000      40.7        18       126        60
OIR    2025130    131400  -10.8400 -136.9100      40.7        18       123        60
OIR    2025130    131400  -10.8400 -136.9200      40.6        18       122        60
OIR    2025130    131400  -10.8400 -136.9300      40.6        18       121        60
OIR    2025130    131400  -10.8400 -136.9400      40.6        18       121        60
OIR    2025130    131400  -10.8400 -136.9500      40.6        18       123        60
OIR    2025130    131400  -10.8400 -136.9600      40.6        18       127        60
OIR    2025130    131400  -10.8400 -136.9700      40.5        18       124        60
OIR    2025130    131400  -10.8400 -136.9800      40.5        18       121        60
OIR    2025130    131400  -10.8400 -136.9900      40.5        18       117        60
OIR    2025130    131400  -10.8400 -137.0000      40.6        17       116        60
OIR    2025130    131400  -10.8400 -137.0100      40.6        17       113        60
OIR    2025130    131400  -10.8400 -137.0200      40.6        17       111        60
OIR    2025130    131400  -10.8400 -137.0300      40.6        17       110        60
OIR    2025130    131400  -10.8400 -137.0400      40.6        17       110        60
OIR    2025130    131400  -10.8400 -137.0500      40.6        16       112        60
OIR    2025130    131400  -10.8400 -137.0600      40.7        16       114        60
OIR    2025130    131400  -10.8400 -137.0700      40.9        15       115        60
OIR    2025130    131400  -10.8400 -137.0800      41.1        14       116        60
OIR    2025130    131400  -10.8400 -137.0900      41.3        13       116        60
OIR    2025130    131400  -10.8400 -137.1000      41.5        12       115        60
OIR    2025130    131400  -10.8400 -137.1100      41.6        11       115        60
OIR    2025130    131400  -10.8400 -137.1200      41.5        11       114        60
OIR    2025130    131400  -10.8400 -137.1300      41.5        10       113        60
OIR    2025130    131400  -10.8400 -137.1400      41.3        10       112        60
OIR    2025130    131400  -10.8400 -137.1500      41.2        10       112        60
OIR    2025130    131400  -10.8400 -137.1600      41.2        10       111        60
OIR    2025130    131400  -10.8400 -137.1700      41.2        10       111        60
OIR    2025130    131400  -10.8400 -137.1800      41.1         9       110        60
OIR    2025130    131400  -10.8400 -137.1900      41.1         9       111        60
OIR    2025130    131400  -10.8400 -137.2000      41.1         9       115        60
OIR    2025130    131400  -10.8400 -137.2100      41.1         9       115        60
OIR    2025130    131400  -10.8400 -137.2200      41.0         9       114        60
OIR    2025130    131400  -10.8400 -137.2300      41.0         9       111        60
OIR    2025130    131400  -10.8400 -137.2400      40.9         9       109        60
OIR    2025130    131400  -10.8400 -137.2500      40.9         8       112        60
OIR    2025130    131400  -10.8400 -137.2600      40.8         8       113        60
OIR    2025130    131400  -10.8400 -137.2700      40.8         7       113        60
OIR    2025130    131400  -10.8400 -137.2800      40.7         6       114        60
OIR    2025130    131400  -10.8400 -137.2900      40.7         6       115        60
OIR    2025130    131400  -10.8400 -137.3000      40.7         6       115        60
OIR    2025130    131400  -10.8400 -137.3100      40.7         6       114        60
OIR    2025130    131400  -10.8400 -137.3200      40.6         5       115        60
OIR    2025130    131400  -10.8400 -137.3300      40.6         5       116        60
OIR    2025130    131400  -10.8400 -137.3400      40.6         5       115        60
OIR    2025130    131400  -10.8400 -137.3500      40.6         5       113        60
OIR    2025130    131400  -10.8400 -137.3600      40.5         5       113        60
OIR    2025130    131400  -10.8400 -137.3700      40.4         4       113        60
OIR    2025130    131400  -10.8400 -137.3800      40.1         4       113        60
OIR    2025130    131400  -10.8400 -137.3900      39.5         2       116        60
OIR    2025130    131400  -10.8400 -137.4000      38.7       359       117        60
OIR    2025130    131400  -10.8400 -137.4100      38.5       359       117        60
OIR    2025130    131400  -10.8400 -137.4200      38.4       358       115        60
OIR    2025130    131400  -10.8400 -137.4300      38.2       358       112        60
OIR    2025130    131400  -10.8400 -137.4400      38.1       357       111        60
OIR    2025130    131400  -10.8400 -137.4500      38.0       357       111        60
OIR    2025130    131400  -10.8400 -137.4600      37.9       357       111        60
OIR    2025130    131400  -10.8400 -137.4700      37.8       357       115        60
OIR    2025130    131400  -10.8400 -137.4800      37.6       356       116        60
OIR    2025130    131400  -10.8400 -137.4900      37.5       356       115        60
OIR    2025130    131400  -10.8400 -137.5000      37.3       356       114        60
OIR    2025130    131400  -10.8400 -137.5100      37.2       355       115        60
OIR    2025130    131400  -10.8400 -137.5200      37.1       355       116        60
OIR    2025130    131400  -10.8400 -137.5300      37.1       355       116        60
OIR    2025130    131400  -10.8400 -137.5400      37.0       355       115        60
OIR    2025130    131400  -10.8400 -137.5500      36.9       355       115        60
OIR    2025130    131400  -10.8400 -137.5600      36.8       355       115        60
OIR    2025130    131400  -10.8400 -137.5700      36.7       354       116        60
OIR    2025130    131400  -10.8400 -137.5800      36.7       354       116        60
OIR    2025130    131400  -10.8400 -137.5900      36.6       354       116        60
OIR    2025130    131400  -10.8400 -137.6000      36.5       354       116        60
OIR    2025130    131400  -10.8400 -137.6100      36.5       354       116        60
OIR    2025130    131400  -10.8400 -137.6200      36.5       354       115        60
OIR    2025130    131400  -10.8400 -137.6300      36.4       354       116        60
OIR    2025130    131400  -10.8400 -137.6400      36.4       354       117        60
OIR    2025130    131400  -10.8400 -137.6500      36.3       354       119        60
OIR    2025130    131400  -10.8400 -137.6600      36.2       354       119        60
OIR    2025130    131400  -10.8400 -137.6700      36.1       353       119        60
OIR    2025130    131400  -10.8400 -137.6800      36.0       353       117        60
OIR    2025130    131400  -10.8400 -137.6900      35.8       353       119        60
OIR    2025130    131400  -10.8400 -137.7000      35.4       353       121        60
OIR    2025130    131400  -10.8400 -137.7100      34.9       353       121        60
OIR    2025130    131400  -10.8400 -137.7200      34.4       353       122        60
OIR    2025130    131400  -10.8400 -137.7300      34.0       352       123        60
OIR    2025130    131400  -10.8400 -137.7400      33.5       352       125        60
OIR    2025130    131400  -10.8400 -137.7500      33.1       352       127        60
OIR    2025130    131400  -10.8400 -137.7600      32.9       352       128        60
OIR    2025130    131400  -10.8400 -137.7700      32.8       352       129        60
OIR    2025130    131400  -10.8400 -137.7800      32.7       352       130        60
OIR    2025130    131400  -10.8400 -137.7900      32.4       352       130        60
OIR    2025130    131400  -10.8400 -137.8000      32.1       352       130        60
OIR    2025130    131400  -10.8400 -137.8100      31.6       352       131        60
OIR    2025130    131400  -10.8400 -137.8200      30.5       352       132        60
OIR    2025130    131400  -10.8400 -137.8300      29.4       353       133        60
OIR    2025130    131400  -10.8400 -137.8400      28.6       352       134        60
OIR    2025130    131400  -10.8400 -137.8500      28.1       352       135        60
OIR    2025130    131400  -10.8400 -137.8600      27.7       353       136        60
OIR    2025130    131400  -10.8400 -137.8700      27.5       353       135        60
OIR    2025130    131400  -10.8400 -137.8800      27.3       353       134        60
OIR    2025130    131400  -10.8400 -137.8900      27.2       353       133        60
OIR    2025130    131400  -10.8400 -137.9000      27.2       353       132        60
OIR    2025130    131400  -10.8400 -137.9100      27.1       353       133        60
OIR    2025130    131400  -10.8400 -137.9200      27.0       353       134        60
OIR    2025130    131400  -10.8400 -137.9300      27.0       353       134        60
OIR    2025130    131400  -10.8400 -137.9400      26.9       353       133        60
OIR    2025130    131400  -10.8400 -137.9500      26.9       353       131        60
OIR    2025130    131400  -10.8400 -137.9600      26.8       353       132        60
OIR    2025130    131400  -10.8400 -137.9700      26.8       353       135        60
OIR    2025130    131400  -10.8400 -137.9800      26.8       353       136        60
OIR    2025130    131400  -10.8400 -137.9900      26.8       353       136        60
OIR    2025130    131400  -10.8400 -138.0000      26.7       353       134        60
OIR    2025130    131400  -10.8400 -138.0100      26.7       354       132        60
OIR    2025130    131400  -10.8400 -138.0200      26.7       354       133        60
OIR    2025130    131400  -10.8400 -138.0300      26.7       355       133        60
OIR    2025130    131400  -10.8400 -138.0400      26.7       355       135        60
OIR    2025130    131400  -10.8400 -138.0500      26.7       355       136        60
OIR    2025130    131400  -10.8400 -138.0600      26.7       355       136        60
OIR    2025130    131400  -10.8400 -138.0700      26.7       355       136        60
OIR    2025130    131400  -10.8400 -138.0800      26.8       356       137        60
OIR    2025130    131400  -10.8400 -138.0900      26.8       356       137        60
OIR    2025130    131400  -10.8400 -138.1000      26.8       356       138        60
OIR    2025130    131400  -10.8400 -138.1100      26.8       356       138        60
OIR    2025130    131400  -10.8400 -138.1200      26.8       357       136        60
OIR    2025130    131400  -10.8400 -138.1300      26.8       357       135        60
OIR    2025130    131400  -10.8400 -138.1400      26.9       357       135        60
OIR    2025130    131400  -10.8400 -138.1500      26.9       357       135        60
OIR    2025130    131400  -10.8400 -138.1600      26.9       358       136        60
OIR    2025130    131400  -10.8400 -138.1700      26.9       358       137        60
OIR    2025130    131400  -10.8400 -138.1800      26.9       358       139        60
OIR    2025130    131400  -10.8400 -138.1900      26.9       358       140        60
OIR    2025130    131400  -10.8400 -138.2000      26.9       358       142        60
OIR    2025130    131400  -10.8400 -138.2100      26.9       358       145        60
OIR    2025130    131400  -10.8400 -138.2200      26.9       358       147        60
OIR    2025130    131400  -10.8400 -138.2300      26.9       358       148        60
OIR    2025130    131400  -10.8400 -138.2400      26.9       358       147        60
OIR    2025130    131400  -10.8400 -138.2500      26.9       358       146        60
OIR    2025130    131400  -10.8400 -138.2600      26.9       358       145        60
OIR    2025130    131400  -10.8400 -138.2700      26.9       358       145        60
OIR    2025130    131400  -10.8400 -138.2800      26.9       358       147        60
OIR    2025130    131400  -10.8400 -138.2900      26.9       358       148        60
OIR    2025130    131400  -10.8400 -138.3000      26.9       358       148        60
OIR    2025130    131400  -10.8400 -138.3100      26.9       359       148        60
OIR    2025130    131400  -10.8500 -136.5300      46.2        30       148        60
OIR    2025130    131400  -10.8500 -136.5400      46.2        29       144        60
OIR    2025130    131400  -10.8500 -136.5500      46.3        28       143        60
OIR    2025130    131400  -10.8500 -136.5600      46.4        27       142        60
OIR    2025130    131400  -10.8500 -136.5700      46.3        25       141        60
OIR    2025130    131400  -10.8500 -136.5800      46.2        23       144        60
OIR    2025130    131400  -10.8500 -136.5900      46.1        23       150        60
OIR    2025130    131400  -10.8500 -136.6000      46.0        22       149        60
OIR    2025130    131400  -10.8500 -136.6100      45.9        22       145        60
OIR    2025130    131400  -10.8500 -136.6200      45.9        22       144        60
OIR    2025130    131400  -10.8500 -136.6300      45.8        22       144        60
OIR    2025130    131400  -10.8500 -136.6400      45.8        22       145        60
OIR    2025130    131400  -10.8500 -136.6500      45.7        22       144        60
OIR    2025130    131400  -10.8500 -136.6600      45.7        22       142        60
OIR    2025130    131400  -10.8500 -136.6700      45.6        21       140        60
OIR    2025130    131400  -10.8500 -136.6800      45.3        21       139        60
OIR    2025130    131400  -10.8500 -136.6900      44.1        20       140        60
OIR    2025130    131400  -10.8500 -136.7000      42.9        20       142        60
OIR    2025130    131400  -10.8500 -136.7100      42.3        19       139        60
OIR    2025130    131400  -10.8500 -136.7200      42.0        19       136        60
OIR    2025130    131400  -10.8500 -136.7300      41.9        19       134        60
OIR    2025130    131400  -10.8500 -136.7400      41.7        19       132        60
OIR    2025130    131400  -10.8500 -136.7500      41.7        19       131        60
OIR    2025130    131400  -10.8500 -136.7600      41.6        19       131        60
OIR    2025130    131400  -10.8500 -136.7700      41.5        19       128        60
OIR    2025130    131400  -10.8500 -136.7800      41.5        19       125        60
OIR    2025130    131400  -10.8500 -136.7900      41.4        19       125        60
OIR    2025130    131400  -10.8500 -136.8000      41.3        19       125        60
OIR    2025130    131400  -10.8500 -136.8100      41.3        19       127        60
OIR    2025130    131400  -10.8500 -136.8200      41.2        19       128        60
OIR    2025130    131400  -10.8500 -136.8300      41.1        19       127        60
OIR    2025130    131400  -10.8500 -136.8400      41.1        19       127        60
OIR    2025130    131400  -10.8500 -136.8500      41.0        19       126        60
OIR    2025130    131400  -10.8500 -136.8600      41.0        19       127        60
OIR    2025130    131400  -10.8500 -136.8700      40.9        19       127        60
OIR    2025130    131400  -10.8500 -136.8800      40.9        19       128        60
OIR    2025130    131400  -10.8500 -136.8900      40.8        19       128        60
OIR    2025130    131400  -10.8500 -136.9000      40.7        18       127        60
OIR    2025130    131400  -10.8500 -136.9100      40.7        18       126        60
OIR    2025130    131400  -10.8500 -136.9200      40.7        18       125        60
OIR    2025130    131400  -10.8500 -136.9300      40.6        18       124        60
OIR    2025130    131400  -10.8500 -136.9400      40.6        18       125        60
OIR    2025130    131400  -10.8500 -136.9500      40.6        18       126        60
OIR    2025130    131400  -10.8500 -136.9600      40.6        18       129        60
OIR    2025130    131400  -10.8500 -136.9700      40.5        18       127        60
OIR    2025130    131400  -10.8500 -136.9800      40.5        18       126        60
OIR    2025130    131400  -10.8500 -136.9900      40.5        18       121        60
OIR    2025130    131400  -10.8500 -137.0000      40.5        17       116        60
OIR    2025130    131400  -10.8500 -137.0100      40.5        17       113        60
OIR    2025130    131400  -10.8500 -137.0200      40.5        17       111        60
OIR    2025130    131400  -10.8500 -137.0300      40.5        17       110        60
OIR    2025130    131400  -10.8500 -137.0400      40.5        16       111        60
OIR    2025130    131400  -10.8500 -137.0500      40.6        16       113        60
OIR    2025130    131400  -10.8500 -137.0600      40.6        15       114        60
OIR    2025130    131400  -10.8500 -137.0700      40.7        15       115        60
OIR    2025130    131400  -10.8500 -137.0800      40.9        14       115        60
OIR    2025130    131400  -10.8500 -137.0900      41.1        13       115        60
OIR    2025130    131400  -10.8500 -137.1000      41.2        12       116        60
OIR    2025130    131400  -10.8500 -137.1100      41.3        11       116        60
OIR    2025130    131400  -10.8500 -137.1200      41.4        11       116        60
OIR    2025130    131400  -10.8500 -137.1300      41.3        10       115        60
OIR    2025130    131400  -10.8500 -137.1400      41.2        10       114        60
OIR    2025130    131400  -10.8500 -137.1500      41.2        10       113        60
OIR    2025130    131400  -10.8500 -137.1600      41.2        10       111        60
OIR    2025130    131400  -10.8500 -137.1700      41.1         9       110        60
OIR    2025130    131400  -10.8500 -137.1800      41.1         9       109        60
OIR    2025130    131400  -10.8500 -137.1900      41.1         9       110        60
OIR    2025130    131400  -10.8500 -137.2000      41.1         9       114        60
OIR    2025130    131400  -10.8500 -137.2100      41.1         9       114        60
OIR    2025130    131400  -10.8500 -137.2200      41.0         9       114        60
OIR    2025130    131400  -10.8500 -137.2300      41.0         9       111        60
OIR    2025130    131400  -10.8500 -137.2400      40.9         9       109        60
OIR    2025130    131400  -10.8500 -137.2500      40.8         8       112        60
OIR    2025130    131400  -10.8500 -137.2600      40.8         8       114        60
OIR    2025130    131400  -10.8500 -137.2700      40.8         7       114        60
OIR    2025130    131400  -10.8500 -137.2800      40.8         6       116        60
OIR    2025130    131400  -10.8500 -137.2900      40.7         6       116        60
OIR    2025130    131400  -10.8500 -137.3000      40.7         6       116        60
OIR    2025130    131400  -10.8500 -137.3100      40.7         6       115        60
OIR    2025130    131400  -10.8500 -137.3200      40.7         5       115        60
OIR    2025130    131400  -10.8500 -137.3300      40.6         5       116        60
OIR    2025130    131400  -10.8500 -137.3400      40.6         5       115        60
OIR    2025130    131400  -10.8500 -137.3500      40.6         5       115        60
OIR    2025130    131400  -10.8500 -137.3600      40.5         5       115        60
OIR    2025130    131400  -10.8500 -137.3700      40.4         4       115        60
OIR    2025130    131400  -10.8500 -137.3800      40.1         3       114        60
OIR    2025130    131400  -10.8500 -137.3900      39.7         2       115        60
OIR    2025130    131400  -10.8500 -137.4000      39.2       359       117        60
OIR    2025130    131400  -10.8500 -137.4100      39.0       358       117        60
OIR    2025130    131400  -10.8500 -137.4200      38.8       358       116        60
OIR    2025130    131400  -10.8500 -137.4300      38.4       357       114        60
OIR    2025130    131400  -10.8500 -137.4400      38.2       357       112        60
OIR    2025130    131400  -10.8500 -137.4500      38.1       357       113        60
OIR    2025130    131400  -10.8500 -137.4600      38.0       357       113        60
OIR    2025130    131400  -10.8500 -137.4700      37.9       357       115        60
OIR    2025130    131400  -10.8500 -137.4800      37.8       356       116        60
OIR    2025130    131400  -10.8500 -137.4900      37.6       356       115        60
OIR    2025130    131400  -10.8500 -137.5000      37.5       356       115        60
OIR    2025130    131400  -10.8500 -137.5100      37.3       355       116        60
OIR    2025130    131400  -10.8500 -137.5200      37.2       355       116        60
OIR    2025130    131400  -10.8500 -137.5300      37.1       355       117        60
OIR    2025130    131400  -10.8500 -137.5400      37.0       355       116        60
OIR    2025130    131400  -10.8500 -137.5500      36.9       355       116        60
OIR    2025130    131400  -10.8500 -137.5600      36.9       354       116        60
OIR    2025130    131400  -10.8500 -137.5700      36.8       354       115        60
OIR    2025130    131400  -10.8500 -137.5800      36.7       354       116        60
OIR    2025130    131400  -10.8500 -137.5900      36.6       354       116        60
OIR    2025130    131400  -10.8500 -137.6000      36.5       354       116        60
OIR    2025130    131400  -10.8500 -137.6100      36.5       354       116        60
OIR    2025130    131400  -10.8500 -137.6200      36.4       354       117        60
OIR    2025130    131400  -10.8500 -137.6300      36.4       354       117        60
OIR    2025130    131400  -10.8500 -137.6400      36.3       354       119        60
OIR    2025130    131400  -10.8500 -137.6500      36.3       354       119        60
OIR    2025130    131400  -10.8500 -137.6600      36.2       353       117        60
OIR    2025130    131400  -10.8500 -137.6700      36.1       353       117        60
OIR    2025130    131400  -10.8500 -137.6800      35.9       353       119        60
OIR    2025130    131400  -10.8500 -137.6900      35.6       353       121        60
OIR    2025130    131400  -10.8500 -137.7000      35.2       353       123        60
OIR    2025130    131400  -10.8500 -137.7100      34.7       353       123        60
OIR    2025130    131400  -10.8500 -137.7200      34.3       352       124        60
OIR    2025130    131400  -10.8500 -137.7300      33.9       352       125        60
OIR    2025130    131400  -10.8500 -137.7400      33.4       352       126        60
OIR    2025130    131400  -10.8500 -137.7500      33.1       352       128        60
OIR    2025130    131400  -10.8500 -137.7600      32.9       352       129        60
OIR    2025130    131400  -10.8500 -137.7700      32.8       352       129        60
OIR    2025130    131400  -10.8500 -137.7800      32.6       352       130        60
OIR    2025130    131400  -10.8500 -137.7900      32.4       352       130        60
OIR    2025130    131400  -10.8500 -137.8000      32.0       352       130        60
OIR    2025130    131400  -10.8500 -137.8100      31.2       352       130        60
OIR    2025130    131400  -10.8500 -137.8200      30.1       352       131        60
OIR    2025130    131400  -10.8500 -137.8300      29.2       353       133        60
OIR    2025130    131400  -10.8500 -137.8400      28.4       352       134        60
OIR    2025130    131400  -10.8500 -137.8500      27.9       352       135        60
OIR    2025130    131400  -10.8500 -137.8600      27.6       353       135        60
OIR    2025130    131400  -10.8500 -137.8700      27.4       353       135        60
OIR    2025130    131400  -10.8500 -137.8800      27.3       353       134        60
OIR    2025130    131400  -10.8500 -137.8900      27.2       353       133        60
OIR    2025130    131400  -10.8500 -137.9000      27.1       353       133        60
OIR    2025130    131400  -10.8500 -137.9100      27.0       353       134        60
OIR    2025130    131400  -10.8500 -137.9200      27.0       353       135        60
OIR    2025130    131400  -10.8500 -137.9300      26.9       353       134        60
OIR    2025130    131400  -10.8500 -137.9400      26.9       353       133        60
OIR    2025130    131400  -10.8500 -137.9500      26.8       353       132        60
OIR    2025130    131400  -10.8500 -137.9600      26.8       353       132        60
OIR    2025130    131400  -10.8500 -137.9700      26.8       353       134        60
OIR    2025130    131400  -10.8500 -137.9800      26.8       353       136        60
OIR    2025130    131400  -10.8500 -137.9900      26.7       353       137        60
OIR    2025130    131400  -10.8500 -138.0000      26.7       353       136        60
OIR    2025130    131400  -10.8500 -138.0100      26.7       353       134        60
OIR    2025130    131400  -10.8500 -138.0200      26.7       354       134        60
OIR    2025130    131400  -10.8500 -138.0300      26.7       354       134        60
OIR    2025130    131400  -10.8500 -138.0400      26.7       354       135        60
OIR    2025130    131400  -10.8500 -138.0500      26.7       355       137        60
OIR    2025130    131400  -10.8500 -138.0600      26.7       355       136        60
OIR    2025130    131400  -10.8500 -138.0700      26.7       355       136        60
OIR    2025130    131400  -10.8500 -138.0800      26.7       355       137        60
OIR    2025130    131400  -10.8500 -138.0900      26.8       356       137        60
OIR    2025130    131400  -10.8500 -138.1000      26.8       356       138        60
OIR    2025130    131400  -10.8500 -138.1100      26.8       356       138        60
OIR    2025130    131400  -10.8500 -138.1200      26.8       356       137        60
OIR    2025130    131400  -10.8500 -138.1300      26.8       357       136        60
OIR    2025130    131400  -10.8500 -138.1400      26.9       357       135        60
OIR    2025130    131400  -10.8500 -138.1500      26.9       357       135        60
OIR    2025130    131400  -10.8500 -138.1600      26.9       358       135        60
OIR    2025130    131400  -10.8500 -138.1700      26.9       358       137        60
OIR    2025130    131400  -10.8500 -138.1800      26.9       358       138        60
OIR    2025130    131400  -10.8500 -138.1900      26.9       358       140        60
OIR    2025130    131400  -10.8500 -138.2000      26.9       358       141        60
OIR    2025130    131400  -10.8500 -138.2100      26.9       358       143        60
OIR    2025130    131400  -10.8500 -138.2200      26.9       358       145        60
OIR    2025130    131400  -10.8500 -138.2300      26.9       358       147        60
OIR    2025130    131400  -10.8500 -138.2400      26.9       358       147        60
OIR    2025130    131400  -10.8500 -138.2500      26.9       358       146        60
OIR    2025130    131400  -10.8500 -138.2600      26.9       358       146        60
OIR    2025130    131400  -10.8500 -138.2700      26.9       358       147        60
OIR    2025130    131400  -10.8500 -138.3000      26.9       358       149        60
OIR    2025130    131400  -10.8500 -138.3100      26.9       359       149        60
OIR    2025130    131400  -10.8600 -136.5300      46.2        29       146        60
OIR    2025130    131400  -10.8600 -136.5400      46.2        29       141        60
OIR    2025130    131400  -10.8600 -136.5500      46.3        27       141        60
OIR    2025130    131400  -10.8600 -136.5600      46.5        25       141        60
OIR    2025130    131400  -10.8600 -136.5700      46.5        24       142        60
OIR    2025130    131400  -10.8600 -136.5800      46.3        23       146        60
OIR    2025130    131400  -10.8600 -136.5900      46.2        23       151        60
OIR    2025130    131400  -10.8600 -136.6000      46.0        22       149        60
OIR    2025130    131400  -10.8600 -136.6100      45.9        22       145        60
OIR    2025130    131400  -10.8600 -136.6200      45.9        22       143        60
OIR    2025130    131400  -10.8600 -136.6300      45.8        22       142        60
OIR    2025130    131400  -10.8600 -136.6400      45.8        22       143        60
OIR    2025130    131400  -10.8600 -136.6500      45.7        22       143        60
OIR    2025130    131400  -10.8600 -136.6600      45.7        22       139        60
OIR    2025130    131400  -10.8600 -136.6700      45.6        21       135        60
OIR    2025130    131400  -10.8600 -136.6800      45.4        21       134        60
OIR    2025130    131400  -10.8600 -136.6900      44.4        21       136        60
OIR    2025130    131400  -10.8600 -136.7000      43.0        20       139        60
OIR    2025130    131400  -10.8600 -136.7100      42.3        19       136        60
OIR    2025130    131400  -10.8600 -136.7200      42.0        19       132        60
OIR    2025130    131400  -10.8600 -136.7300      41.9        19       131        60
OIR    2025130    131400  -10.8600 -136.7400      41.8        19       131        60
OIR    2025130    131400  -10.8600 -136.7500      41.7        19       131        60
OIR    2025130    131400  -10.8600 -136.7600      41.6        19       131        60
OIR    2025130    131400  -10.8600 -136.7700      41.5        19       128        60
OIR    2025130    131400  -10.8600 -136.7800      41.5        19       125        60
OIR    2025130    131400  -10.8600 -136.7900      41.4        19       125        60
OIR    2025130    131400  -10.8600 -136.8000      41.3        19       126        60
OIR    2025130    131400  -10.8600 -136.8100      41.3        19       126        60
OIR    2025130    131400  -10.8600 -136.8200      41.2        19       126        60
OIR    2025130    131400  -10.8600 -136.8300      41.1        19       124        60
OIR    2025130    131400  -10.8600 -136.8400      41.1        19       125        60
OIR    2025130    131400  -10.8600 -136.8500      41.0        19       126        60
OIR    2025130    131400  -10.8600 -136.8600      41.0        19       126        60
OIR    2025130    131400  -10.8600 -136.8700      40.9        19       127        60
OIR    2025130    131400  -10.8600 -136.8800      40.9        19       127        60
OIR    2025130    131400  -10.8600 -136.8900      40.8        18       127        60
OIR    2025130    131400  -10.8600 -136.9000      40.8        18       128        60
OIR    2025130    131400  -10.8600 -136.9100      40.7        18       128        60
OIR    2025130    131400  -10.8600 -136.9200      40.7        18       128        60
OIR    2025130    131400  -10.8600 -136.9300      40.7        18       128        60
OIR    2025130    131400  -10.8600 -136.9400      40.6        18       129        60
OIR    2025130    131400  -10.8600 -136.9500      40.6        18       130        60
OIR    2025130    131400  -10.8600 -136.9600      40.6        18       131        60
OIR    2025130    131400  -10.8600 -136.9700      40.5        18       131        60
OIR    2025130    131400  -10.8600 -136.9800      40.5        18       131        60
OIR    2025130    131400  -10.8600 -136.9900      40.5        18       124        60
OIR    2025130    131400  -10.8600 -137.0000      40.5        17       116        60
OIR    2025130    131400  -10.8600 -137.0100      40.5        17       113        60
OIR    2025130    131400  -10.8600 -137.0200      40.4        17       111        60
OIR    2025130    131400  -10.8600 -137.0300      40.4        16       111        60
OIR    2025130    131400  -10.8600 -137.0400      40.4        16       112        60
OIR    2025130    131400  -10.8600 -137.0500      40.4        15       115        60
OIR    2025130    131400  -10.8600 -137.0600      40.5        15       115        60
OIR    2025130    131400  -10.8600 -137.0700      40.5        14       114        60
OIR    2025130    131400  -10.8600 -137.0800      40.7        14       114        60
OIR    2025130    131400  -10.8600 -137.0900      40.9        13       115        60
OIR    2025130    131400  -10.8600 -137.1000      41.0        12       116        60
OIR    2025130    131400  -10.8600 -137.1100      41.2        11       119        60
OIR    2025130    131400  -10.8600 -137.1200      41.2        10       117        60
OIR    2025130    131400  -10.8600 -137.1300      41.2        10       117        60
OIR    2025130    131400  -10.8600 -137.1400      41.2        10       116        60
OIR    2025130    131400  -10.8600 -137.1500      41.1        10       114        60
OIR    2025130    131400  -10.8600 -137.1600      41.1        10       113        60
OIR    2025130    131400  -10.8600 -137.1700      41.1         9       111        60
OIR    2025130    131400  -10.8600 -137.1800      41.1         9       110        60
OIR    2025130    131400  -10.8600 -137.1900      41.1         9       111        60
OIR    2025130    131400  -10.8600 -137.2000      41.1         9       114        60
OIR    2025130    131400  -10.8600 -137.2100      41.1         9       114        60
OIR    2025130    131400  -10.8600 -137.2200      41.0         9       113        60
OIR    2025130    131400  -10.8600 -137.2300      40.9         9       111        60
OIR    2025130    131400  -10.8600 -137.2400      40.9         9       109        60
OIR    2025130    131400  -10.8600 -137.2500      40.8         8       113        60
OIR    2025130    131400  -10.8600 -137.2600      40.8         8       116        60
OIR    2025130    131400  -10.8600 -137.2700      40.8         7       116        60
OIR    2025130    131400  -10.8600 -137.2800      40.8         6       116        60
OIR    2025130    131400  -10.8600 -137.2900      40.8         6       119        60
OIR    2025130    131400  -10.8600 -137.3000      40.8         6       119        60
OIR    2025130    131400  -10.8600 -137.3100      40.7         6       116        60
OIR    2025130    131400  -10.8600 -137.3200      40.7         6       115        60
OIR    2025130    131400  -10.8600 -137.3300      40.6         5       115        60
OIR    2025130    131400  -10.8600 -137.3400      40.6         5       116        60
OIR    2025130    131400  -10.8600 -137.3500      40.6         5       116        60
OIR    2025130    131400  -10.8600 -137.3600      40.5         5       117        60
OIR    2025130    131400  -10.8600 -137.3700      40.4         4       116        60
OIR    2025130    131400  -10.8600 -137.3800      40.2         3       115        60
OIR    2025130    131400  -10.8600 -137.3900      39.9         1       115        60
OIR    2025130    131400  -10.8600 -137.4000      39.6       359       116        60
OIR    2025130    131400  -10.8600 -137.4100      39.3       359       116        60
OIR    2025130    131400  -10.8600 -137.4200      39.0       358       116        60
OIR    2025130    131400  -10.8600 -137.4300      38.7       357       115        60
OIR    2025130    131400  -10.8600 -137.4400      38.4       357       113        60
OIR    2025130    131400  -10.8600 -137.4500      38.2       357       114        60
OIR    2025130    131400  -10.8600 -137.4600      38.1       357       115        60
OIR    2025130    131400  -10.8600 -137.4700      38.0       357       115        60
OIR    2025130    131400  -10.8600 -137.4800      37.9       356       115        60
OIR    2025130    131400  -10.8600 -137.4900      37.7       356       115        60
OIR    2025130    131400  -10.8600 -137.5000      37.6       356       115        60
OIR    2025130    131400  -10.8600 -137.5100      37.4       355       116        60
OIR    2025130    131400  -10.8600 -137.5200      37.3       355       117        60
OIR    2025130    131400  -10.8600 -137.5300      37.2       355       120        60
OIR    2025130    131400  -10.8600 -137.5400      37.1       355       119        60
OIR    2025130    131400  -10.8600 -137.5500      37.0       355       117        60
OIR    2025130    131400  -10.8600 -137.5600      36.9       354       116        60
OIR    2025130    131400  -10.8600 -137.5700      36.8       354       114        60
OIR    2025130    131400  -10.8600 -137.5800      36.7       354       116        60
OIR    2025130    131400  -10.8600 -137.5900      36.6       354       117        60
OIR    2025130    131400  -10.8600 -137.6000      36.5       354       117        60
OIR    2025130    131400  -10.8600 -137.6100      36.5       354       119        60
OIR    2025130    131400  -10.8600 -137.6200      36.4       354       120        60
OIR    2025130    131400  -10.8600 -137.6300      36.4       354       121        60
OIR    2025130    131400  -10.8600 -137.6400      36.3       354       120        60
OIR    2025130    131400  -10.8600 -137.6500      36.2       353       119        60
OIR    2025130    131400  -10.8600 -137.6600      36.1       353       117        60
OIR    2025130    131400  -10.8600 -137.6700      36.0       353       119        60
OIR    2025130    131400  -10.8600 -137.6800      35.8       353       120        60
OIR    2025130    131400  -10.8600 -137.6900      35.5       353       122        60
OIR    2025130    131400  -10.8600 -137.7000      35.1       353       124        60
OIR    2025130    131400  -10.8600 -137.7100      34.7       352       124        60
OIR    2025130    131400  -10.8600 -137.7200      34.3       352       125        60
OIR    2025130    131400  -10.8600 -137.7300      33.9       352       126        60
OIR    2025130    131400  -10.8600 -137.7400      33.4       352       128        60
OIR    2025130    131400  -10.8600 -137.7500      33.1       352       130        60
OIR    2025130    131400  -10.8600 -137.7600      32.9       352       130        60
OIR    2025130    131400  -10.8600 -137.7700      32.7       352       130        60
OIR    2025130    131400  -10.8600 -137.7800      32.6       352       130        60
OIR    2025130    131400  -10.8600 -137.7900      32.3       352       130        60
OIR    2025130    131400  -10.8600 -137.8000      31.8       352       130        60
OIR    2025130    131400  -10.8600 -137.8100      30.9       352       130        60
OIR    2025130    131400  -10.8600 -137.8200      30.0       352       131        60
OIR    2025130    131400  -10.8600 -137.8300      29.0       352       132        60
OIR    2025130    131400  -10.8600 -137.8400      28.3       352       133        60
OIR    2025130    131400  -10.8600 -137.8500      27.8       352       134        60
OIR    2025130    131400  -10.8600 -137.8600      27.5       352       135        60
OIR    2025130    131400  -10.8600 -137.8700      27.3       353       135        60
OIR    2025130    131400  -10.8600 -137.8800      27.2       353       134        60
OIR    2025130    131400  -10.8600 -137.8900      27.1       353       134        60
OIR    2025130    131400  -10.8600 -137.9000      27.1       353       135        60
OIR    2025130    131400  -10.8600 -137.9100      27.0       353       135        60
OIR    2025130    131400  -10.8600 -137.9200      26.9       353       135        60
OIR    2025130    131400  -10.8600 -137.9300      26.9       353       135        60
OIR    2025130    131400  -10.8600 -137.9400      26.8       353       134        60
OIR    2025130    131400  -10.8600 -137.9500      26.8       353       132        60
OIR    2025130    131400  -10.8600 -137.9600      26.8       353       133        60
OIR    2025130    131400  -10.8600 -137.9700      26.8       353       134        60
OIR    2025130    131400  -10.8600 -137.9800      26.7       353       136        60
OIR    2025130    131400  -10.8600 -137.9900      26.7       353       137        60
OIR    2025130    131400  -10.8600 -138.0000      26.7       353       137        60
OIR    2025130    131400  -10.8600 -138.0100      26.7       353       135        60
OIR    2025130    131400  -10.8600 -138.0200      26.7       353       135        60
OIR    2025130    131400  -10.8600 -138.0300      26.6       354       135        60
OIR    2025130    131400  -10.8600 -138.0400      26.6       354       136        60
OIR    2025130    131400  -10.8600 -138.0500      26.6       354       137        60
OIR    2025130    131400  -10.8600 -138.0600      26.7       355       136        60
OIR    2025130    131400  -10.8600 -138.0700      26.7       355       136        60
OIR    2025130    131400  -10.8600 -138.0800      26.7       355       137        60
OIR    2025130    131400  -10.8600 -138.0900      26.7       355       137        60
OIR    2025130    131400  -10.8600 -138.1000      26.8       356       138        60
OIR    2025130    131400  -10.8600 -138.1100      26.8       356       138        60
OIR    2025130    131400  -10.8600 -138.1200      26.8       356       138        60
OIR    2025130    131400  -10.8600 -138.1300      26.8       356       137        60
OIR    2025130    131400  -10.8600 -138.1400      26.8       357       136        60
OIR    2025130    131400  -10.8600 -138.1500      26.9       357       135        60
OIR    2025130    131400  -10.8600 -138.1600      26.9       358       135        60
OIR    2025130    131400  -10.8600 -138.1700      26.9       358       137        60
OIR    2025130    131400  -10.8600 -138.1800      26.9       358       138        60
OIR    2025130    131400  -10.8600 -138.1900      26.9       358       139        60
OIR    2025130    131400  -10.8600 -138.2000      26.9       358       141        60
OIR    2025130    131400  -10.8600 -138.2100      26.9       358       143        60
OIR    2025130    131400  -10.8600 -138.2200      26.9       358       145        60
OIR    2025130    131400  -10.8600 -138.2300      26.9       358       147        60
OIR    2025130    131400  -10.8600 -138.2400      26.9       358       147        60
OIR    2025130    131400  -10.8600 -138.2500      26.9       358       147        60
OIR    2025130    131400  -10.8600 -138.2600      26.9       358       148        60
OIR    2025130    131400  -10.8700 -136.5400      45.8        27       147        60
OIR    2025130    131400  -10.8700 -136.5500      46.3        26       144        60
OIR    2025130    131400  -10.8700 -136.5600      46.5        25       142        60
OIR    2025130    131400  -10.8700 -136.5700      46.5        24       143        60
OIR    2025130    131400  -10.8700 -136.5800      46.4        23       146        60
OIR    2025130    131400  -10.8700 -136.5900      46.3        23       151        60
OIR    2025130    131400  -10.8700 -136.6000      46.1        23       150        60
OIR    2025130    131400  -10.8700 -136.6100      45.9        22       148        60
OIR    2025130    131400  -10.8700 -136.6200      45.8        22       147        60
OIR    2025130    131400  -10.8700 -136.6300      45.8        22       146        60
OIR    2025130    131400  -10.8700 -136.6400      45.8        22       145        60
OIR    2025130    131400  -10.8700 -136.6500      45.7        22       143        60
OIR    2025130    131400  -10.8700 -136.6600      45.7        22       139        60
OIR    2025130    131400  -10.8700 -136.6700      45.6        21       136        60
OIR    2025130    131400  -10.8700 -136.6800      45.4        21       134        60
OIR    2025130    131400  -10.8700 -136.6900      44.4        21       135        60
OIR    2025130    131400  -10.8700 -136.7000      43.1        20       136        60
OIR    2025130    131400  -10.8700 -136.7100      42.3        19       134        60
OIR    2025130    131400  -10.8700 -136.7200      42.0        19       132        60
OIR    2025130    131400  -10.8700 -136.7300      41.8        19       131        60
OIR    2025130    131400  -10.8700 -136.7400      41.8        19       131        60
OIR    2025130    131400  -10.8700 -136.7500      41.7        19       131        60
OIR    2025130    131400  -10.8700 -136.7600      41.6        19       131        60
OIR    2025130    131400  -10.8700 -136.7700      41.5        19       128        60
OIR    2025130    131400  -10.8700 -136.7800      41.4        19       126        60
OIR    2025130    131400  -10.8700 -136.7900      41.4        19       125        60
OIR    2025130    131400  -10.8700 -136.8000      41.3        19       125        60
OIR    2025130    131400  -10.8700 -136.8100      41.3        19       124        60
OIR    2025130    131400  -10.8700 -136.8200      41.2        19       124        60
OIR    2025130    131400  -10.8700 -136.8300      41.1        19       124        60
OIR    2025130    131400  -10.8700 -136.8400      41.1        19       125        60
OIR    2025130    131400  -10.8700 -136.8500      41.0        19       125        60
OIR    2025130    131400  -10.8700 -136.8600      41.0        19       126        60
OIR    2025130    131400  -10.8700 -136.8700      40.9        19       127        60
OIR    2025130    131400  -10.8700 -136.8800      40.9        19       127        60
OIR    2025130    131400  -10.8700 -136.8900      40.8        18       128        60
OIR    2025130    131400  -10.8700 -136.9000      40.8        18       129        60
OIR    2025130    131400  -10.8700 -136.9100      40.7        18       130        60
OIR    2025130    131400  -10.8700 -136.9200      40.7        18       129        60
OIR    2025130    131400  -10.8700 -136.9300      40.7        18       129        60
OIR    2025130    131400  -10.8700 -136.9400      40.6        18       131        60
OIR    2025130    131400  -10.8700 -136.9500      40.6        18       132        60
OIR    2025130    131400  -10.8700 -136.9600      40.6        18       134        60
OIR    2025130    131400  -10.8700 -136.9700      40.5        18       133        60
OIR    2025130    131400  -10.8700 -136.9800      40.5        18       131        60
OIR    2025130    131400  -10.8700 -136.9900      40.5        18       125        60
OIR    2025130    131400  -10.8700 -137.0000      40.4        17       119        60
OIR    2025130    131400  -10.8700 -137.0100      40.4        17       116        60
OIR    2025130    131400  -10.8700 -137.0200      40.2        16       115        60
OIR    2025130    131400  -10.8700 -137.0300      40.2        15       114        60
OIR    2025130    131400  -10.8700 -137.0400      40.2        15       114        60
OIR    2025130    131400  -10.8700 -137.0500      40.2        15       116        60
OIR    2025130    131400  -10.8700 -137.0600      40.3        14       116        60
OIR    2025130    131400  -10.8700 -137.0700      40.4        14       117        60
OIR    2025130    131400  -10.8700 -137.0800      40.5        13       117        60
OIR    2025130    131400  -10.8700 -137.0900      40.7        13       117        60
OIR    2025130    131400  -10.8700 -137.1000      40.8        12       117        60
OIR    2025130    131400  -10.8700 -137.1100      41.0        11       116        60
OIR    2025130    131400  -10.8700 -137.1200      41.1        10       116        60
OIR    2025130    131400  -10.8700 -137.1300      41.1        10       116        60
OIR    2025130    131400  -10.8700 -137.1400      41.1        10       116        60
OIR    2025130    131400  -10.8700 -137.1500      41.1        10       116        60
OIR    2025130    131400  -10.8700 -137.1600      41.1         9       116        60
OIR    2025130    131400  -10.8700 -137.1700      41.1         9       116        60
OIR    2025130    131400  -10.8700 -137.1800      41.1         9       115        60
OIR    2025130    131400  -10.8700 -137.1900      41.1         9       116        60
OIR    2025130    131400  -10.8700 -137.2000      41.1         9       117        60
OIR    2025130    131400  -10.8700 -137.2100      41.0         9       116        60
OIR    2025130    131400  -10.8700 -137.2200      41.0         9       115        60
OIR    2025130    131400  -10.8700 -137.2300      40.9         9       113        60
OIR    2025130    131400  -10.8700 -137.2400      40.9         9       111        60
OIR    2025130    131400  -10.8700 -137.2500      40.8         8       115        60
OIR    2025130    131400  -10.8700 -137.2600      40.8         8       117        60
OIR    2025130    131400  -10.8700 -137.2700      40.8         7       117        60
OIR    2025130    131400  -10.8700 -137.2800      40.8         6       117        60
OIR    2025130    131400  -10.8700 -137.2900      40.8         6       117        60
OIR    2025130    131400  -10.8700 -137.3000      40.8         6       117        60
OIR    2025130    131400  -10.8700 -137.3100      40.8         6       116        60
OIR    2025130    131400  -10.8700 -137.3200      40.7         6       116        60
OIR    2025130    131400  -10.8700 -137.3300      40.6         5       116        60
OIR    2025130    131400  -10.8700 -137.3400      40.6         5       116        60
OIR    2025130    131400  -10.8700 -137.3500      40.6         5       117        60
OIR    2025130    131400  -10.8700 -137.3600      40.5         5       117        60
OIR    2025130    131400  -10.8700 -137.3700      40.5         4       117        60
OIR    2025130    131400  -10.8700 -137.3800      40.3         4       117        60
OIR    2025130    131400  -10.8700 -137.3900      40.2         2       117        60
OIR    2025130    131400  -10.8700 -137.4000      39.9       360       116        60
OIR    2025130    131400  -10.8700 -137.4100      39.5       359       116        60
OIR    2025130    131400  -10.8700 -137.4200      39.2       358       116        60
OIR    2025130    131400  -10.8700 -137.4300      38.8       357       115        60
OIR    2025130    131400  -10.8700 -137.4400      38.5       357       114        60
OIR    2025130    131400  -10.8700 -137.4500      38.3       357       115        60
OIR    2025130    131400  -10.8700 -137.4600      38.2       357       115        60
OIR    2025130    131400  -10.8700 -137.4700      38.1       357       114        60
OIR    2025130    131400  -10.8700 -137.4800      38.0       356       114        60
OIR    2025130    131400  -10.8700 -137.4900      37.9       356       115        60
OIR    2025130    131400  -10.8700 -137.5000      37.7       356       116        60
OIR    2025130    131400  -10.8700 -137.5100      37.6       355       116        60
OIR    2025130    131400  -10.8700 -137.5200      37.4       355       119        60
OIR    2025130    131400  -10.8700 -137.5300      37.3       355       122        60
OIR    2025130    131400  -10.8700 -137.5400      37.2       355       120        60
OIR    2025130    131400  -10.8700 -137.5500      37.0       354       116        60
OIR    2025130    131400  -10.8700 -137.5600      36.9       354       116        60
OIR    2025130    131400  -10.8700 -137.5700      36.8       354       116        60
OIR    2025130    131400  -10.8700 -137.5800      36.7       354       117        60
OIR    2025130    131400  -10.8700 -137.5900      36.6       354       119        60
OIR    2025130    131400  -10.8700 -137.6000      36.5       354       119        60
OIR    2025130    131400  -10.8700 -137.6100      36.5       354       120        60
OIR    2025130    131400  -10.8700 -137.6200      36.4       354       121        60
OIR    2025130    131400  -10.8700 -137.6300      36.4       354       122        60
OIR    2025130    131400  -10.8700 -137.6400      36.3       353       121        60
OIR    2025130    131400  -10.8700 -137.6500      36.2       353       121        60
OIR    2025130    131400  -10.8700 -137.6600      36.0       353       120        60
OIR    2025130    131400  -10.8700 -137.6700      35.9       353       121        60
OIR    2025130    131400  -10.8700 -137.6800      35.7       353       121        60
OIR    2025130    131400  -10.8700 -137.6900      35.5       353       122        60
OIR    2025130    131400  -10.8700 -137.7000      35.1       353       123        60
OIR    2025130    131400  -10.8700 -137.7100      34.7       352       124        60
OIR    2025130    131400  -10.8700 -137.7200      34.3       352       125        60
OIR    2025130    131400  -10.8700 -137.7300      33.9       352       127        60
OIR    2025130    131400  -10.8700 -137.7400      33.4       352       129        60
OIR    2025130    131400  -10.8700 -137.7500      33.1       352       132        60
OIR    2025130    131400  -10.8700 -137.7600      32.9       352       131        60
OIR    2025130    131400  -10.8700 -137.7700      32.7       352       131        60
OIR    2025130    131400  -10.8700 -137.7800      32.5       352       131        60
OIR    2025130    131400  -10.8700 -137.7900      32.2       352       132        60
OIR    2025130    131400  -10.8700 -137.8000      31.5       352       131        60
OIR    2025130    131400  -10.8700 -137.8100      30.7       352       130        60
OIR    2025130    131400  -10.8700 -137.8200      29.7       352       130        60
OIR    2025130    131400  -10.8700 -137.8300      28.7       352       131        60
OIR    2025130    131400  -10.8700 -137.8400      28.1       352       132        60
OIR    2025130    131400  -10.8700 -137.8500      27.7       352       133        60
OIR    2025130    131400  -10.8700 -137.8600      27.4       352       135        60
OIR    2025130    131400  -10.8700 -137.8700      27.3       353       135        60
OIR    2025130    131400  -10.8700 -137.8800      27.2       353       135        60
OIR    2025130    131400  -10.8700 -137.8900      27.1       353       136        60
OIR    2025130    131400  -10.8700 -137.9000      27.0       353       137        60
OIR    2025130    131400  -10.8700 -137.9100      27.0       353       136        60
OIR    2025130    131400  -10.8700 -137.9200      26.9       353       135        60
OIR    2025130    131400  -10.8700 -137.9300      26.9       353       135        60
OIR    2025130    131400  -10.8700 -137.9400      26.8       353       134        60
OIR    2025130    131400  -10.8700 -137.9500      26.8       353       134        60
OIR    2025130    131400  -10.8700 -137.9600      26.8       353       135        60
OIR    2025130    131400  -10.8700 -137.9700      26.7       353       135        60
OIR    2025130    131400  -10.8700 -137.9800      26.7       353       136        60
OIR    2025130    131400  -10.8700 -137.9900      26.7       353       137        60
OIR    2025130    131400  -10.8700 -138.0000      26.7       353       137        60
OIR    2025130    131400  -10.8700 -138.0100      26.7       353       137        60
OIR    2025130    131400  -10.8700 -138.0200      26.7       353       137        60
OIR    2025130    131400  -10.8700 -138.0300      26.6       353       137        60
OIR    2025130    131400  -10.8700 -138.0400      26.6       354       137        60
OIR    2025130    131400  -10.8700 -138.0500      26.6       354       137        60
OIR    2025130    131400  -10.8700 -138.0600      26.7       354       136        60
OIR    2025130    131400  -10.8700 -138.0700      26.7       354       136        60
OIR    2025130    131400  -10.8700 -138.0800      26.7       355       136        60
OIR    2025130    131400  -10.8700 -138.0900      26.7       355       137        60
OIR    2025130    131400  -10.8700 -138.1000      26.8       355       138        60
OIR    2025130    131400  -10.8700 -138.1100      26.8       356       138        60
OIR    2025130    131400  -10.8700 -138.1200      26.8       356       138        60
OIR    2025130    131400  -10.8700 -138.1300      26.8       356       137        60
OIR    2025130    131400  -10.8700 -138.1400      26.8       357       136        60
OIR    2025130    131400  -10.8700 -138.1500      26.8       357       135        60
OIR    2025130    131400  -10.8700 -138.1600      26.9       358       136        60
OIR    2025130    131400  -10.8700 -138.1700      26.9       358       138        60
OIR    2025130    131400  -10.8700 -138.1800      26.9       358       139        60
OIR    2025130    131400  -10.8700 -138.1900      26.9       358       140        60
OIR    2025130    131400  -10.8700 -138.2000      26.9       358       142        60
OIR    2025130    131400  -10.8700 -138.2100      26.9       358       144        60
OIR    2025130    131400  -10.8700 -138.2200      26.9       358       147        60
OIR    2025130    131400  -10.8700 -138.2300      26.9       358       151        60
OIR    2025130    131400  -10.8700 -138.2400      26.9       358       150        60
OIR    2025130    131400  -10.8700 -138.2500      26.9       358       150        60
OIR    2025130    131400  -10.8800 -136.5500      46.0        25       148        60
OIR    2025130    131400  -10.8800 -136.5600      46.5        24       143        60
OIR    2025130    131400  -10.8800 -136.5700      46.5        24       143        60
OIR    2025130    131400  -10.8800 -136.5800      46.4        23       146        60
OIR    2025130    131400  -10.8800 -136.5900      46.4        23       150        60
OIR    2025130    131400  -10.8800 -136.6200      45.9        22       151        60
OIR    2025130    131400  -10.8800 -136.6300      45.8        22       149        60
OIR    2025130    131400  -10.8800 -136.6400      45.8        22       147        60
OIR    2025130    131400  -10.8800 -136.6500      45.7        22       144        60
OIR    2025130    131400  -10.8800 -136.6600      45.7        22       141        60
OIR    2025130    131400  -10.8800 -136.6700      45.5        21       137        60
OIR    2025130    131400  -10.8800 -136.6800      45.2        21       135        60
OIR    2025130    131400  -10.8800 -136.6900      44.2        21       134        60
OIR    2025130    131400  -10.8800 -136.7000      43.0        20       134        60
OIR    2025130    131400  -10.8800 -136.7100      42.2        19       133        60
OIR    2025130    131400  -10.8800 -136.7200      41.9        19       131        60
OIR    2025130    131400  -10.8800 -136.7300      41.8        19       130        60
OIR    2025130    131400  -10.8800 -136.7400      41.8        19       130        60
OIR    2025130    131400  -10.8800 -136.7500      41.7        19       131        60
OIR    2025130    131400  -10.8800 -136.7600      41.6        19       130        60
OIR    2025130    131400  -10.8800 -136.7700      41.5        19       128        60
OIR    2025130    131400  -10.8800 -136.7800      41.4        19       126        60
OIR    2025130    131400  -10.8800 -136.7900      41.3        19       125        60
OIR    2025130    131400  -10.8800 -136.8000      41.3        19       124        60
OIR    2025130    131400  -10.8800 -136.8100      41.3        19       122        60
OIR    2025130    131400  -10.8800 -136.8200      41.2        19       124        60
OIR    2025130    131400  -10.8800 -136.8300      41.1        19       125        60
OIR    2025130    131400  -10.8800 -136.8400      41.1        19       125        60
OIR    2025130    131400  -10.8800 -136.8500      41.0        19       125        60
OIR    2025130    131400  -10.8800 -136.8600      41.0        19       126        60
OIR    2025130    131400  -10.8800 -136.8700      40.9        19       128        60
OIR    2025130    131400  -10.8800 -136.8800      40.8        18       128        60
OIR    2025130    131400  -10.8800 -136.8900      40.8        18       128        60
OIR    2025130    131400  -10.8800 -136.9000      40.8        18       130        60
OIR    2025130    131400  -10.8800 -136.9100      40.7        18       130        60
OIR    2025130    131400  -10.8800 -136.9200      40.7        18       130        60
OIR    2025130    131400  -10.8800 -136.9300      40.7        18       131        60
OIR    2025130    131400  -10.8800 -136.9400      40.7        18       133        60
OIR    2025130    131400  -10.8800 -136.9500      40.6        18       135        60
OIR    2025130    131400  -10.8800 -136.9600      40.6        18       136        60
OIR    2025130    131400  -10.8800 -136.9700      40.6        18       134        60
OIR    2025130    131400  -10.8800 -136.9800      40.5        18       132        60
OIR    2025130    131400  -10.8800 -136.9900      40.5        17       126        60
OIR    2025130    131400  -10.8800 -137.0000      40.4        17       120        60
OIR    2025130    131400  -10.8800 -137.0100      40.2        16       119        60
OIR    2025130    131400  -10.8800 -137.0200      40.1        15       117        60
OIR    2025130    131400  -10.8800 -137.0300      40.1        15       116        60
OIR    2025130    131400  -10.8800 -137.0400      40.1        15       116        60
OIR    2025130    131400  -10.8800 -137.0500      40.2        14       117        60
OIR    2025130    131400  -10.8800 -137.0600      40.2        14       119        60
OIR    2025130    131400  -10.8800 -137.0700      40.3        14       121        60
OIR    2025130    131400  -10.8800 -137.0800      40.4        13       121        60
OIR    2025130    131400  -10.8800 -137.0900      40.6        13       121        60
OIR    2025130    131400  -10.8800 -137.1000      40.8        12       119        60
OIR    2025130    131400  -10.8800 -137.1100      41.0        11       116        60
OIR    2025130    131400  -10.8800 -137.1200      41.0        10       116        60
OIR    2025130    131400  -10.8800 -137.1300      41.0        10       117        60
OIR    2025130    131400  -10.8800 -137.1400      41.1        10       117        60
OIR    2025130    131400  -10.8800 -137.1500      41.1        10       119        60
OIR    2025130    131400  -10.8800 -137.1600      41.1         9       120        60
OIR    2025130    131400  -10.8800 -137.1700      41.1         9       119        60
OIR    2025130    131400  -10.8800 -137.1800      41.1         9       119        60
OIR    2025130    131400  -10.8800 -137.1900      41.0         9       120        60
OIR    2025130    131400  -10.8800 -137.2000      41.0         9       121        60
OIR    2025130    131400  -10.8800 -137.2100      41.0         9       119        60
OIR    2025130    131400  -10.8800 -137.2200      40.9         9       116        60
OIR    2025130    131400  -10.8800 -137.2300      40.9         9       114        60
OIR    2025130    131400  -10.8800 -137.2400      40.9         9       112        60
OIR    2025130    131400  -10.8800 -137.2500      40.9         8       116        60
OIR    2025130    131400  -10.8800 -137.2600      40.9         8       119        60
OIR    2025130    131400  -10.8800 -137.2700      40.9         6       120        60
OIR    2025130    131400  -10.8800 -137.2800      40.8         6       119        60
OIR    2025130    131400  -10.8800 -137.2900      40.8         6       117        60
OIR    2025130    131400  -10.8800 -137.3000      40.8         6       116        60
OIR    2025130    131400  -10.8800 -137.3100      40.7         6       116        60
OIR    2025130    131400  -10.8800 -137.3200      40.7         5       116        60
OIR    2025130    131400  -10.8800 -137.3300      40.6         5       116        60
OIR    2025130    131400  -10.8800 -137.3400      40.6         5       117        60
OIR    2025130    131400  -10.8800 -137.3500      40.6         5       119        60
OIR    2025130    131400  -10.8800 -137.3600      40.5         4       117        60
OIR    2025130    131400  -10.8800 -137.3700      40.5         4       119        60
OIR    2025130    131400  -10.8800 -137.3800      40.4         4       121        60
OIR    2025130    131400  -10.8800 -137.3900      40.2         2       120        60
OIR    2025130    131400  -10.8800 -137.4000      40.0         0       116        60
OIR    2025130    131400  -10.8800 -137.4100      39.7       359       116        60
OIR    2025130    131400  -10.8800 -137.4200      39.3       358       115        60
OIR    2025130    131400  -10.8800 -137.4300      38.9       358       114        60
OIR    2025130    131400  -10.8800 -137.4400      38.6       357       114        60
OIR    2025130    131400  -10.8800 -137.4500      38.4       357       115        60
OIR    2025130    131400  -10.8800 -137.4600      38.3       357       115        60
OIR    2025130    131400  -10.8800 -137.4700      38.2       357       114        60
OIR    2025130    131400  -10.8800 -137.4800      38.1       356       113        60
OIR    2025130    131400  -10.8800 -137.4900      38.0       356       116        60
OIR    2025130    131400  -10.8800 -137.5000      37.9       356       116        60
OIR    2025130    131400  -10.8800 -137.5100      37.7       355       117        60
OIR    2025130    131400  -10.8800 -137.5200      37.5       355       120        60
OIR    2025130    131400  -10.8800 -137.5300      37.4       355       123        60
OIR    2025130    131400  -10.8800 -137.5400      37.2       355       120        60
OIR    2025130    131400  -10.8800 -137.5500      37.1       354       116        60
OIR    2025130    131400  -10.8800 -137.5600      36.9       354       116        60
OIR    2025130    131400  -10.8800 -137.5700      36.8       354       119        60
OIR    2025130    131400  -10.8800 -137.5800      36.6       354       120        60
OIR    2025130    131400  -10.8800 -137.5900      36.6       354       120        60
OIR    2025130    131400  -10.8800 -137.6000      36.5       354       120        60
OIR    2025130    131400  -10.8800 -137.6100      36.5       354       121        60
OIR    2025130    131400  -10.8800 -137.6200      36.4       354       122        60
OIR    2025130    131400  -10.8800 -137.6300      36.3       353       122        60
OIR    2025130    131400  -10.8800 -137.6400      36.2       353       122        60
OIR    2025130    131400  -10.8800 -137.6500      36.1       353       122        60
OIR    2025130    131400  -10.8800 -137.6600      36.0       353       123        60
OIR    2025130    131400  -10.8800 -137.6700      35.8       353       123        60
OIR    2025130    131400  -10.8800 -137.6800      35.7       353       123        60
OIR    2025130    131400  -10.8800 -137.6900      35.4       353       123        60
OIR    2025130    131400  -10.8800 -137.7000      35.1       352       123        60
OIR    2025130    131400  -10.8800 -137.7100      34.7       352       124        60
OIR    2025130    131400  -10.8800 -137.7200      34.3       352       125        60
OIR    2025130    131400  -10.8800 -137.7300      33.9       352       128        60
OIR    2025130    131400  -10.8800 -137.7400      33.4       352       130        60
OIR    2025130    131400  -10.8800 -137.7500      33.0       351       133        60
OIR    2025130    131400  -10.8800 -137.7600      32.8       352       132        60
OIR    2025130    131400  -10.8800 -137.7700      32.6       352       132        60
OIR    2025130    131400  -10.8800 -137.7800      32.4       352       132        60
OIR    2025130    131400  -10.8800 -137.7900      32.1       352       133        60
OIR    2025130    131400  -10.8800 -137.8000      31.3       352       132        60
OIR    2025130    131400  -10.8800 -137.8100      30.5       352       131        60
OIR    2025130    131400  -10.8800 -137.8200      29.4       352       130        60
OIR    2025130    131400  -10.8800 -137.8300      28.4       352       130        60
OIR    2025130    131400  -10.8800 -137.8400      27.9       352       131        60
OIR    2025130    131400  -10.8800 -137.8500      27.6       352       133        60
OIR    2025130    131400  -10.8800 -137.8600      27.3       352       134        60
OIR    2025130    131400  -10.8800 -137.8700      27.2       352       135        60
OIR    2025130    131400  -10.8800 -137.8800      27.1       353       136        60
OIR    2025130    131400  -10.8800 -137.8900      27.0       353       137        60
OIR    2025130    131400  -10.8800 -137.9000      27.0       353       139        60
OIR    2025130    131400  -10.8800 -137.9100      26.9       353       137        60
OIR    2025130    131400  -10.8800 -137.9200      26.9       353       136        60
OIR    2025130    131400  -10.8800 -137.9300      26.8       353       135        60
OIR    2025130    131400  -10.8800 -137.9400      26.8       353       135        60
OIR    2025130    131400  -10.8800 -137.9500      26.8       353       136        60
OIR    2025130    131400  -10.8800 -137.9600      26.7       353       136        60
OIR    2025130    131400  -10.8800 -137.9700      26.7       353       136        60
OIR    2025130    131400  -10.8800 -137.9800      26.7       353       136        60
OIR    2025130    131400  -10.8800 -137.9900      26.7       353       137        60
OIR    2025130    131400  -10.8800 -138.0000      26.7       353       138        60
OIR    2025130    131400  -10.8800 -138.0100      26.7       353       139        60
OIR    2025130    131400  -10.8800 -138.0200      26.7       353       139        60
OIR    2025130    131400  -10.8800 -138.0300      26.6       353       139        60
OIR    2025130    131400  -10.8800 -138.0400      26.6       353       138        60
OIR    2025130    131400  -10.8800 -138.0500      26.6       354       138        60
OIR    2025130    131400  -10.8800 -138.0600      26.7       354       137        60
OIR    2025130    131400  -10.8800 -138.0700      26.7       354       137        60
OIR    2025130    131400  -10.8800 -138.0800      26.7       354       137        60
OIR    2025130    131400  -10.8800 -138.0900      26.7       354       137        60
OIR    2025130    131400  -10.8800 -138.1000      26.7       355       139        60
OIR    2025130    131400  -10.8800 -138.1100      26.8       355       138        60
OIR    2025130    131400  -10.8800 -138.1200      26.8       356       138        60
OIR    2025130    131400  -10.8800 -138.1300      26.8       356       137        60
OIR    2025130    131400  -10.8800 -138.1400      26.8       356       136        60
OIR    2025130    131400  -10.8800 -138.1500      26.8       357       136        60
OIR    2025130    131400  -10.8800 -138.1600      26.9       358       137        60
OIR    2025130    131400  -10.8800 -138.1700      26.9       358       138        60
OIR    2025130    131400  -10.8800 -138.1800      26.9       358       140        60
OIR    2025130    131400  -10.8800 -138.1900      26.9       358       141        60
OIR    2025130    131400  -10.8800 -138.2000      26.9       358       143        60
OIR    2025130    131400  -10.8800 -138.2100      26.9       358       144        60
OIR    2025130    131400  -10.8800 -138.2200      26.9       358       148        60
OIR    2025130    131400  -10.8900 -136.5600      46.2        24       148        60
OIR    2025130    131400  -10.8900 -136.5700      46.4        23       144        60
OIR    2025130    131400  -10.8900 -136.5800      46.4        23       144        60
OIR    2025130    131400  -10.8900 -136.5900      46.4        23       149        60
OIR    2025130    131400  -10.8900 -136.6000      46.3        23       149        60
OIR    2025130    131400  -10.8900 -136.6100      46.0        22       149        60
OIR    2025130    131400  -10.8900 -136.6200      45.9        22       149        60
OIR    2025130    131400  -10.8900 -136.6300      45.8        22       147        60
OIR    2025130    131400  -10.8900 -136.6400      45.7        22       145        60
OIR    2025130    131400  -10.8900 -136.6500      45.7        22       143        60
OIR    2025130    131400  -10.8900 -136.6600      45.6        21       141        60
OIR    2025130    131400  -10.8900 -136.6700      45.5        21       139        60
OIR    2025130    131400  -10.8900 -136.6800      45.1        21       135        60
OIR    2025130    131400  -10.8900 -136.6900      43.8        20       134        60
OIR    2025130    131400  -10.8900 -136.7000      42.8        20       134        60
OIR    2025130    131400  -10.8900 -136.7100      42.1        19       132        60
OIR    2025130    131400  -10.8900 -136.7200      41.9        19       131        60
OIR    2025130    131400  -10.8900 -136.7300      41.8        19       130        60
OIR    2025130    131400  -10.8900 -136.7400      41.8        19       129        60
OIR    2025130    131400  -10.8900 -136.7500      41.7        19       129        60
OIR    2025130    131400  -10.8900 -136.7600      41.6        19       129        60
OIR    2025130    131400  -10.8900 -136.7700      41.5        19       127        60
OIR    2025130    131400  -10.8900 -136.7800      41.4        19       126        60
OIR    2025130    131400  -10.8900 -136.7900      41.3        19       125        60
OIR    2025130    131400  -10.8900 -136.8000      41.3        19       125        60
OIR    2025130    131400  -10.8900 -136.8100      41.2        19       126        60
OIR    2025130    131400  -10.8900 -136.8200      41.2        19       127        60
OIR    2025130    131400  -10.8900 -136.8300      41.1        19       128        60
OIR    2025130    131400  -10.8900 -136.8400      41.0        19       128        60
OIR    2025130    131400  -10.8900 -136.8500      41.0        19       127        60
OIR    2025130    131400  -10.8900 -136.8600      40.9        19       128        60
OIR    2025130    131400  -10.8900 -136.8700      40.9        18       130        60
OIR    2025130    131400  -10.8900 -136.8800      40.8        18       129        60
OIR    2025130    131400  -10.8900 -136.8900      40.8        18       129        60
OIR    2025130    131400  -10.8900 -136.9000      40.8        18       127        60
OIR    2025130    131400  -10.8900 -136.9100      40.7        18       127        60
OIR    2025130    131400  -10.8900 -136.9200      40.7        18       131        60
OIR    2025130    131400  -10.8900 -136.9300      40.7        18       133        60
OIR    2025130    131400  -10.8900 -136.9400      40.7        18       134        60
OIR    2025130    131400  -10.8900 -136.9500      40.7        18       136        60
OIR    2025130    131400  -10.8900 -136.9600      40.6        18       138        60
OIR    2025130    131400  -10.8900 -136.9700      40.6        18       136        60
OIR    2025130    131400  -10.8900 -136.9800      40.5        17       133        60
OIR    2025130    131400  -10.8900 -136.9900      40.4        17       125        60
OIR    2025130    131400  -10.8900 -137.0000      40.3        17       117        60
OIR    2025130    131400  -10.8900 -137.0100      40.1        16       117        60
OIR    2025130    131400  -10.8900 -137.0200      40.1        15       117        60
OIR    2025130    131400  -10.8900 -137.0300      40.1        15       117        60
OIR    2025130    131400  -10.8900 -137.0400      40.1        15       117        60
OIR    2025130    131400  -10.8900 -137.0500      40.1        14       119        60
OIR    2025130    131400  -10.8900 -137.0600      40.2        14       120        60
OIR    2025130    131400  -10.8900 -137.0700      40.2        14       122        60
OIR    2025130    131400  -10.8900 -137.0800      40.3        13       122        60
OIR    2025130    131400  -10.8900 -137.0900      40.5        13       123        60
OIR    2025130    131400  -10.8900 -137.1000      40.7        12       122        60
OIR    2025130    131400  -10.8900 -137.1100      40.9        10       121        60
OIR    2025130    131400  -10.8900 -137.1200      41.0        10       119        60
OIR    2025130    131400  -10.8900 -137.1300      41.0        10       119        60
OIR    2025130    131400  -10.8900 -137.1400      41.0        10       120        60
OIR    2025130    131400  -10.8900 -137.1500      41.0         9       120        60
OIR    2025130    131400  -10.8900 -137.1600      41.0         9       120        60
OIR    2025130    131400  -10.8900 -137.1700      41.0         9       119        60
OIR    2025130    131400  -10.8900 -137.1800      41.0         9       117        60
OIR    2025130    131400  -10.8900 -137.1900      41.0         9       120        60
OIR    2025130    131400  -10.8900 -137.2000      41.0         9       123        60
OIR    2025130    131400  -10.8900 -137.2100      40.9         9       121        60
OIR    2025130    131400  -10.8900 -137.2200      40.9         9       119        60
OIR    2025130    131400  -10.8900 -137.2300      40.9         9       116        60
OIR    2025130    131400  -10.8900 -137.2400      40.9         9       114        60
OIR    2025130    131400  -10.8900 -137.2500      40.9         8       116        60
OIR    2025130    131400  -10.8900 -137.2600      40.8         8       117        60
OIR    2025130    131400  -10.8900 -137.2700      40.8         6       120        60
OIR    2025130    131400  -10.8900 -137.2800      40.8         6       120        60
OIR    2025130    131400  -10.8900 -137.2900      40.8         6       117        60
OIR    2025130    131400  -10.8900 -137.3000      40.8         6       116        60
OIR    2025130    131400  -10.8900 -137.3100      40.7         6       116        60
OIR    2025130    131400  -10.8900 -137.3200      40.7         5       116        60
OIR    2025130    131400  -10.8900 -137.3300      40.7         5       117        60
OIR    2025130    131400  -10.8900 -137.3400      40.6         5       119        60
OIR    2025130    131400  -10.8900 -137.3500      40.6         5       121        60
OIR    2025130    131400  -10.8900 -137.3600      40.5         4       117        60
OIR    2025130    131400  -10.8900 -137.3700      40.5         4       119        60
OIR    2025130    131400  -10.8900 -137.3800      40.4         4       123        60
OIR    2025130    131400  -10.8900 -137.3900      40.2         2       122        60
OIR    2025130    131400  -10.8900 -137.4000      39.9         0       119        60
OIR    2025130    131400  -10.8900 -137.4100      39.7       359       116        60
OIR    2025130    131400  -10.8900 -137.4200      39.4       359       116        60
OIR    2025130    131400  -10.8900 -137.4300      38.9       358       114        60
OIR    2025130    131400  -10.8900 -137.4400      38.6       357       113        60
OIR    2025130    131400  -10.8900 -137.4500      38.5       357       114        60
OIR    2025130    131400  -10.8900 -137.4600      38.4       357       114        60
OIR    2025130    131400  -10.8900 -137.4700      38.4       356       114        60
OIR    2025130    131400  -10.8900 -137.4800      38.3       356       114        60
OIR    2025130    131400  -10.8900 -137.4900      38.3       356       117        60
OIR    2025130    131400  -10.8900 -137.5000      38.1       355       119        60
OIR    2025130    131400  -10.8900 -137.5100      37.9       355       120        60
OIR    2025130    131400  -10.8900 -137.5200      37.7       355       121        60
OIR    2025130    131400  -10.8900 -137.5300      37.5       355       122        60
OIR    2025130    131400  -10.8900 -137.5400      37.3       354       117        60
OIR    2025130    131400  -10.8900 -137.5500      37.1       354       114        60
OIR    2025130    131400  -10.8900 -137.5600      36.9       354       117        60
OIR    2025130    131400  -10.8900 -137.5700      36.7       354       121        60
OIR    2025130    131400  -10.8900 -137.5800      36.6       354       122        60
OIR    2025130    131400  -10.8900 -137.5900      36.5       354       122        60
OIR    2025130    131400  -10.8900 -137.6000      36.5       354       122        60
OIR    2025130    131400  -10.8900 -137.6100      36.5       354       122        60
OIR    2025130    131400  -10.8900 -137.6200      36.4       353       122        60
OIR    2025130    131400  -10.8900 -137.6300      36.3       353       122        60
OIR    2025130    131400  -10.8900 -137.6400      36.2       353       123        60
OIR    2025130    131400  -10.8900 -137.6500      36.1       353       124        60
OIR    2025130    131400  -10.8900 -137.6600      35.9       353       125        60
OIR    2025130    131400  -10.8900 -137.6700      35.8       353       125        60
OIR    2025130    131400  -10.8900 -137.6800      35.6       353       124        60
OIR    2025130    131400  -10.8900 -137.6900      35.3       352       124        60
OIR    2025130    131400  -10.8900 -137.7000      35.1       352       124        60
OIR    2025130    131400  -10.8900 -137.7100      34.7       352       125        60
OIR    2025130    131400  -10.8900 -137.7200      34.4       352       127        60
OIR    2025130    131400  -10.8900 -137.7300      33.9       351       129        60
OIR    2025130    131400  -10.8900 -137.7400      33.3       351       131        60
OIR    2025130    131400  -10.8900 -137.7500      33.0       351       133        60
OIR    2025130    131400  -10.8900 -137.7600      32.8       351       133        60
OIR    2025130    131400  -10.8900 -137.7700      32.6       351       132        60
OIR    2025130    131400  -10.8900 -137.7800      32.4       351       132        60
OIR    2025130    131400  -10.8900 -137.7900      31.9       352       132        60
OIR    2025130    131400  -10.8900 -137.8000      31.2       352       132        60
OIR    2025130    131400  -10.8900 -137.8100      30.2       352       132        60
OIR    2025130    131400  -10.8900 -137.8200      29.0       352       131        60
OIR    2025130    131400  -10.8900 -137.8300      28.1       352       130        60
OIR    2025130    131400  -10.8900 -137.8400      27.7       352       131        60
OIR    2025130    131400  -10.8900 -137.8500      27.4       352       132        60
OIR    2025130    131400  -10.8900 -137.8600      27.3       352       134        60
OIR    2025130    131400  -10.8900 -137.8700      27.1       352       135        60
OIR    2025130    131400  -10.8900 -137.8800      27.0       352       136        60
OIR    2025130    131400  -10.8900 -137.8900      27.0       352       138        60
OIR    2025130    131400  -10.8900 -137.9000      26.9       353       140        60
OIR    2025130    131400  -10.8900 -137.9100      26.9       353       137        60
OIR    2025130    131400  -10.8900 -137.9200      26.8       353       136        60
OIR    2025130    131400  -10.8900 -137.9300      26.8       353       136        60
OIR    2025130    131400  -10.8900 -137.9400      26.8       353       137        60
OIR    2025130    131400  -10.8900 -137.9500      26.8       353       139        60
OIR    2025130    131400  -10.8900 -137.9600      26.7       353       139        60
OIR    2025130    131400  -10.8900 -137.9700      26.7       353       137        60
OIR    2025130    131400  -10.8900 -137.9800      26.7       353       138        60
OIR    2025130    131400  -10.8900 -137.9900      26.7       353       140        60
OIR    2025130    131400  -10.8900 -138.0000      26.7       353       141        60
OIR    2025130    131400  -10.8900 -138.0100      26.7       353       142        60
OIR    2025130    131400  -10.8900 -138.0200      26.7       353       140        60
OIR    2025130    131400  -10.8900 -138.0300      26.7       353       139        60
OIR    2025130    131400  -10.8900 -138.0400      26.7       353       138        60
OIR    2025130    131400  -10.8900 -138.0500      26.7       353       138        60
OIR    2025130    131400  -10.8900 -138.0600      26.7       353       138        60
OIR    2025130    131400  -10.8900 -138.0700      26.7       354       138        60
OIR    2025130    131400  -10.8900 -138.0800      26.7       354       139        60
OIR    2025130    131400  -10.8900 -138.0900      26.7       354       139        60
OIR    2025130    131400  -10.8900 -138.1000      26.7       354       139        60
OIR    2025130    131400  -10.8900 -138.1100      26.8       355       138        60
OIR    2025130    131400  -10.8900 -138.1200      26.8       355       137        60
OIR    2025130    131400  -10.8900 -138.1300      26.8       356       137        60
OIR    2025130    131400  -10.8900 -138.1400      26.8       356       137        60
OIR    2025130    131400  -10.8900 -138.1500      26.8       357       137        60
OIR    2025130    131400  -10.8900 -138.1600      26.8       357       138        60
OIR    2025130    131400  -10.8900 -138.1700      26.9       358       139        60
OIR    2025130    131400  -10.8900 -138.1800      26.9       358       140        60
OIR    2025130    131400  -10.8900 -138.1900      26.9       358       142        60
OIR    2025130    131400  -10.8900 -138.2000      26.9       358       143        60
OIR    2025130    131400  -10.8900 -138.2100      26.9       358       145        60
OIR    2025130    131400  -10.8900 -138.2200      26.9       358       148        60
OIR    2025130    131400  -10.8900 -138.2300      26.9       358       151        60
OIR    2025130    131400  -10.9000 -136.5700      46.3        23       145        60
OIR    2025130    131400  -10.9000 -136.5800      46.3        23       144        60
OIR    2025130    131400  -10.9000 -136.5900      46.3        23       148        60
OIR    2025130    131400  -10.9000 -136.6000      46.2        23       148        60
OIR    2025130    131400  -10.9000 -136.6100      45.9        22       147        60
OIR    2025130    131400  -10.9000 -136.6200      45.8        22       146        60
OIR    2025130    131400  -10.9000 -136.6300      45.8        22       146        60
OIR    2025130    131400  -10.9000 -136.6400      45.7        22       143        60
OIR    2025130    131400  -10.9000 -136.6500      45.6        22       141        60
OIR    2025130    131400  -10.9000 -136.6600      45.6        21       140        60
OIR    2025130    131400  -10.9000 -136.6700      45.4        21       139        60
OIR    2025130    131400  -10.9000 -136.6800      44.9        21       135        60
OIR    2025130    131400  -10.9000 -136.6900      43.7        20       134        60
OIR    2025130    131400  -10.9000 -136.7000      42.8        20       134        60
OIR    2025130    131400  -10.9000 -136.7100      42.0        19       132        60
OIR    2025130    131400  -10.9000 -136.7200      41.9        19       131        60
OIR    2025130    131400  -10.9000 -136.7300      41.8        19       129        60
OIR    2025130    131400  -10.9000 -136.7400      41.7        19       127        60
OIR    2025130    131400  -10.9000 -136.7500      41.6        19       127        60
OIR    2025130    131400  -10.9000 -136.7600      41.5        19       126        60
OIR    2025130    131400  -10.9000 -136.7700      41.4        19       125        60
OIR    2025130    131400  -10.9000 -136.7800      41.3        19       125        60
OIR    2025130    131400  -10.9000 -136.7900      41.3        19       126        60
OIR    2025130    131400  -10.9000 -136.8000      41.2        19       127        60
OIR    2025130    131400  -10.9000 -136.8100      41.2        19       130        60
OIR    2025130    131400  -10.9000 -136.8200      41.1        19       131        60
OIR    2025130    131400  -10.9000 -136.8300      41.1        19       132        60
OIR    2025130    131400  -10.9000 -136.8400      41.0        19       131        60
OIR    2025130    131400  -10.9000 -136.8500      41.0        19       130        60
OIR    2025130    131400  -10.9000 -136.8600      40.9        18       131        60
OIR    2025130    131400  -10.9000 -136.8700      40.9        18       131        60
OIR    2025130    131400  -10.9000 -136.8800      40.8        18       131        60
OIR    2025130    131400  -10.9000 -136.8900      40.8        18       130        60
OIR    2025130    131400  -10.9000 -136.9000      40.8        18       127        60
OIR    2025130    131400  -10.9000 -136.9100      40.7        18       128        60
OIR    2025130    131400  -10.9000 -136.9200      40.7        18       132        60
OIR    2025130    131400  -10.9000 -136.9300      40.7        18       135        60
OIR    2025130    131400  -10.9000 -136.9400      40.7        18       136        60
OIR    2025130    131400  -10.9000 -136.9500      40.7        18       137        60
OIR    2025130    131400  -10.9000 -136.9600      40.7        18       139        60
OIR    2025130    131400  -10.9000 -136.9700      40.6        18       136        60
OIR    2025130    131400  -10.9000 -136.9800      40.5        17       134        60
OIR    2025130    131400  -10.9000 -136.9900      40.3        17       126        60
OIR    2025130    131400  -10.9000 -137.0000      40.2        16       117        60
OIR    2025130    131400  -10.9000 -137.0100      40.0        15       119        60
OIR    2025130    131400  -10.9000 -137.0200      40.0        15       119        60
OIR    2025130    131400  -10.9000 -137.0300      40.0        15       120        60
OIR    2025130    131400  -10.9000 -137.0400      40.0        14       120        60
OIR    2025130    131400  -10.9000 -137.0500      40.1        14       121        60
OIR    2025130    131400  -10.9000 -137.0600      40.1        14       122        60
OIR    2025130    131400  -10.9000 -137.0700      40.2        14       124        60
OIR    2025130    131400  -10.9000 -137.0800      40.3        13       124        60
OIR    2025130    131400  -10.9000 -137.0900      40.5        12       124        60
OIR    2025130    131400  -10.9000 -137.1000      40.7        12       124        60
OIR    2025130    131400  -10.9000 -137.1100      40.9        10       124        60
OIR    2025130    131400  -10.9000 -137.1200      41.0        10       121        60
OIR    2025130    131400  -10.9000 -137.1300      41.0        10       120        60
OIR    2025130    131400  -10.9000 -137.1400      41.0         9       120        60
OIR    2025130    131400  -10.9000 -137.1500      41.0         9       120        60
OIR    2025130    131400  -10.9000 -137.1600      41.0         9       120        60
OIR    2025130    131400  -10.9000 -137.1700      41.0         9       120        60
OIR    2025130    131400  -10.9000 -137.1800      41.0         9       119        60
OIR    2025130    131400  -10.9000 -137.1900      41.0         9       122        60
OIR    2025130    131400  -10.9000 -137.2000      41.0         9       124        60
OIR    2025130    131400  -10.9000 -137.2100      40.9         9       122        60
OIR    2025130    131400  -10.9000 -137.2200      40.9         9       120        60
OIR    2025130    131400  -10.9000 -137.2300      40.9         9       116        60
OIR    2025130    131400  -10.9000 -137.2400      40.9         9       115        60
OIR    2025130    131400  -10.9000 -137.2500      40.9         8       116        60
OIR    2025130    131400  -10.9000 -137.2600      40.8         8       117        60
OIR    2025130    131400  -10.9000 -137.2700      40.8         6       120        60
OIR    2025130    131400  -10.9000 -137.2800      40.8         6       120        60
OIR    2025130    131400  -10.9000 -137.2900      40.8         6       119        60
OIR    2025130    131400  -10.9000 -137.3000      40.8         6       117        60
OIR    2025130    131400  -10.9000 -137.3100      40.8         6       116        60
OIR    2025130    131400  -10.9000 -137.3200      40.7         5       116        60
OIR    2025130    131400  -10.9000 -137.3300      40.7         5       117        60
OIR    2025130    131400  -10.9000 -137.3400      40.7         5       119        60
OIR    2025130    131400  -10.9000 -137.3500      40.7         5       121        60
OIR    2025130    131400  -10.9000 -137.3600      40.6         4       119        60
OIR    2025130    131400  -10.9000 -137.3700      40.5         4       120        60
OIR    2025130    131400  -10.9000 -137.3800      40.5         4       124        60
OIR    2025130    131400  -10.9000 -137.3900      40.3         2       123        60
OIR    2025130    131400  -10.9000 -137.4000      40.0         1       120        60
OIR    2025130    131400  -10.9000 -137.4100      39.6       359       117        60
OIR    2025130    131400  -10.9000 -137.4200      39.4       359       116        60
OIR    2025130    131400  -10.9000 -137.4300      39.1       358       116        60
OIR    2025130    131400  -10.9000 -137.4400      38.9       357       115        60
OIR    2025130    131400  -10.9000 -137.4500      38.8       357       115        60
OIR    2025130    131400  -10.9000 -137.4600      38.7       357       115        60
OIR    2025130    131400  -10.9000 -137.4700      38.6       356       115        60
OIR    2025130    131400  -10.9000 -137.4800      38.5       356       116        60
OIR    2025130    131400  -10.9000 -137.4900      38.5       356       117        60
OIR    2025130    131400  -10.9000 -137.5000      38.5       356       120        60
OIR    2025130    131400  -10.9000 -137.5100      38.3       355       121        60
OIR    2025130    131400  -10.9000 -137.5200      38.0       355       122        60
OIR    2025130    131400  -10.9000 -137.5300      37.7       355       122        60
OIR    2025130    131400  -10.9000 -137.5400      37.4       354       117        60
OIR    2025130    131400  -10.9000 -137.5500      37.1       354       116        60
OIR    2025130    131400  -10.9000 -137.5600      36.9       354       119        60
OIR    2025130    131400  -10.9000 -137.5700      36.7       354       122        60
OIR    2025130    131400  -10.9000 -137.5800      36.6       354       123        60
OIR    2025130    131400  -10.9000 -137.5900      36.5       354       124        60
OIR    2025130    131400  -10.9000 -137.6000      36.5       354       124        60
OIR    2025130    131400  -10.9000 -137.6100      36.4       353       123        60
OIR    2025130    131400  -10.9000 -137.6200      36.3       353       123        60
OIR    2025130    131400  -10.9000 -137.6300      36.3       353       123        60
OIR    2025130    131400  -10.9000 -137.6400      36.2       353       124        60
OIR    2025130    131400  -10.9000 -137.6500      36.0       353       125        60
OIR    2025130    131400  -10.9000 -137.6600      35.9       353       127        60
OIR    2025130    131400  -10.9000 -137.6700      35.7       353       126        60
OIR    2025130    131400  -10.9000 -137.6800      35.5       352       126        60
OIR    2025130    131400  -10.9000 -137.6900      35.3       352       126        60
OIR    2025130    131400  -10.9000 -137.7000      35.0       352       126        60
OIR    2025130    131400  -10.9000 -137.7100      34.6       352       127        60
OIR    2025130    131400  -10.9000 -137.7200      34.3       351       129        60
OIR    2025130    131400  -10.9000 -137.7300      33.8       351       131        60
OIR    2025130    131400  -10.9000 -137.7400      33.2       351       132        60
OIR    2025130    131400  -10.9000 -137.7500      32.9       351       134        60
OIR    2025130    131400  -10.9000 -137.7600      32.8       351       133        60
OIR    2025130    131400  -10.9000 -137.7700      32.6       351       133        60
OIR    2025130    131400  -10.9000 -137.7800      32.3       351       132        60
OIR    2025130    131400  -10.9000 -137.7900      31.8       351       132        60
OIR    2025130    131400  -10.9000 -137.8000      31.0       351       132        60
OIR    2025130    131400  -10.9000 -137.8100      29.7       352       132        60
OIR    2025130    131400  -10.9000 -137.8200      28.6       352       131        60
OIR    2025130    131400  -10.9000 -137.8300      27.9       352       131        60
OIR    2025130    131400  -10.9000 -137.8400      27.5       352       132        60
OIR    2025130    131400  -10.9000 -137.8500      27.3       352       132        60
OIR    2025130    131400  -10.9000 -137.8600      27.2       352       133        60
OIR    2025130    131400  -10.9000 -137.8700      27.0       352       135        60
OIR    2025130    131400  -10.9000 -137.8800      27.0       352       136        60
OIR    2025130    131400  -10.9000 -137.8900      26.9       352       138        60
OIR    2025130    131400  -10.9000 -137.9000      26.9       352       139        60
OIR    2025130    131400  -10.9000 -137.9100      26.8       352       136        60
OIR    2025130    131400  -10.9000 -137.9200      26.8       353       136        60
OIR    2025130    131400  -10.9000 -137.9300      26.8       353       136        60
OIR    2025130    131400  -10.9000 -137.9400      26.8       353       138        60
OIR    2025130    131400  -10.9000 -137.9500      26.7       353       142        60
OIR    2025130    131400  -10.9000 -137.9600      26.7       353       142        60
OIR    2025130    131400  -10.9000 -137.9700      26.7       353       140        60
OIR    2025130    131400  -10.9000 -137.9800      26.7       353       141        60
OIR    2025130    131400  -10.9000 -137.9900      26.7       353       141        60
OIR    2025130    131400  -10.9000 -138.0000      26.7       353       141        60
OIR    2025130    131400  -10.9000 -138.0100      26.7       353       142        60
OIR    2025130    131400  -10.9000 -138.0200      26.7       353       140        60
OIR    2025130    131400  -10.9000 -138.0300      26.7       353       139        60
OIR    2025130    131400  -10.9000 -138.0400      26.7       353       138        60
OIR    2025130    131400  -10.9000 -138.0500      26.7       353       138        60
OIR    2025130    131400  -10.9000 -138.0600      26.7       353       139        60
OIR    2025130    131400  -10.9000 -138.0700      26.7       353       139        60
OIR    2025130    131400  -10.9000 -138.0800      26.7       353       139        60
OIR    2025130    131400  -10.9000 -138.0900      26.7       354       139        60
OIR    2025130    131400  -10.9000 -138.1000      26.7       354       139        60
OIR    2025130    131400  -10.9000 -138.1100      26.7       354       138        60
OIR    2025130    131400  -10.9000 -138.1200      26.8       355       137        60
OIR    2025130    131400  -10.9000 -138.1300      26.8       355       137        60
OIR    2025130    131400  -10.9000 -138.1400      26.8       356       137        60
OIR    2025130    131400  -10.9000 -138.1500      26.8       356       138        60
OIR    2025130    131400  -10.9000 -138.1600      26.8       357       138        60
OIR    2025130    131400  -10.9000 -138.1700      26.8       358       139        60
OIR    2025130    131400  -10.9000 -138.1800      26.9       358       141        60
OIR    2025130    131400  -10.9000 -138.1900      26.9       358       142        60
OIR    2025130    131400  -10.9000 -138.2000      26.9       358       145        60
OIR    2025130    131400  -10.9000 -138.2100      26.9       358       147        60
OIR    2025130    131400  -10.9000 -138.2200      26.9       358       149        60
OIR    2025130    131400  -10.9000 -138.2300      26.9       358       150        60
OIR    2025130    131400  -10.9100 -136.5700      46.1        23       149        60
OIR    2025130    131400  -10.9100 -136.5800      46.2        23       150        60
OIR    2025130    131400  -10.9100 -136.6000      46.1        22       149        60
OIR    2025130    131400  -10.9100 -136.6100      45.8        22       143        60
OIR    2025130    131400  -10.9100 -136.6200      45.8        22       142        60
OIR    2025130    131400  -10.9100 -136.6300      45.7        22       142        60
OIR    2025130    131400  -10.9100 -136.6400      45.7        22       139        60
OIR    2025130    131400  -10.9100 -136.6500      45.6        21       138        60
OIR    2025130    131400  -10.9100 -136.6600      45.5        21       137        60
OIR    2025130    131400  -10.9100 -136.6700      45.3        21       137        60
OIR    2025130    131400  -10.9100 -136.6800      44.6        21       135        60
OIR    2025130    131400  -10.9100 -136.6900      43.4        20       133        60
OIR    2025130    131400  -10.9100 -136.7000      42.7        19       133        60
OIR    2025130    131400  -10.9100 -136.7100      42.0        19       132        60
OIR    2025130    131400  -10.9100 -136.7200      41.8        19       131        60
OIR    2025130    131400  -10.9100 -136.7300      41.7        19       128        60
OIR    2025130    131400  -10.9100 -136.7400      41.7        19       125        60
OIR    2025130    131400  -10.9100 -136.7500      41.5        19       123        60
OIR    2025130    131400  -10.9100 -136.7600      41.4        19       122        60
OIR    2025130    131400  -10.9100 -136.7700      41.3        19       124        60
OIR    2025130    131400  -10.9100 -136.7800      41.3        19       125        60
OIR    2025130    131400  -10.9100 -136.7900      41.2        19       127        60
OIR    2025130    131400  -10.9100 -136.8000      41.2        19       130        60
OIR    2025130    131400  -10.9100 -136.8100      41.1        19       133        60
OIR    2025130    131400  -10.9100 -136.8200      41.1        19       135        60
OIR    2025130    131400  -10.9100 -136.8300      41.0        19       137        60
OIR    2025130    131400  -10.9100 -136.8400      41.0        19       136        60
OIR    2025130    131400  -10.9100 -136.8500      40.9        18       133        60
OIR    2025130    131400  -10.9100 -136.8600      40.9        18       132        60
OIR    2025130    131400  -10.9100 -136.8700      40.8        18       132        60
OIR    2025130    131400  -10.9100 -136.8800      40.8        18       131        60
OIR    2025130    131400  -10.9100 -136.8900      40.8        18       131        60
OIR    2025130    131400  -10.9100 -136.9000      40.7        18       132        60
OIR    2025130    131400  -10.9100 -136.9100      40.7        18       133        60
OIR    2025130    131400  -10.9100 -136.9200      40.7        18       134        60
OIR    2025130    131400  -10.9100 -136.9300      40.7        18       136        60
OIR    2025130    131400  -10.9100 -136.9400      40.7        18       137        60
OIR    2025130    131400  -10.9100 -136.9500      40.6        18       138        60
OIR    2025130    131400  -10.9100 -136.9600      40.6        18       139        60
OIR    2025130    131400  -10.9100 -136.9700      40.6        17       136        60
OIR    2025130    131400  -10.9100 -136.9800      40.5        17       133        60
OIR    2025130    131400  -10.9100 -136.9900      40.2        16       127        60
OIR    2025130    131400  -10.9100 -137.0000      40.0        16       122        60
OIR    2025130    131400  -10.9100 -137.0100      40.0        15       122        60
OIR    2025130    131400  -10.9100 -137.0200      40.0        15       122        60
OIR    2025130    131400  -10.9100 -137.0300      40.0        14       121        60
OIR    2025130    131400  -10.9100 -137.0400      40.0        14       121        60
OIR    2025130    131400  -10.9100 -137.0500      40.0        14       123        60
OIR    2025130    131400  -10.9100 -137.0600      40.1        14       124        60
OIR    2025130    131400  -10.9100 -137.0700      40.1        14       126        60
OIR    2025130    131400  -10.9100 -137.0800      40.2        13       126        60
OIR    2025130    131400  -10.9100 -137.0900      40.4        12       125        60
OIR    2025130    131400  -10.9100 -137.1000      40.7        11       126        60
OIR    2025130    131400  -10.9100 -137.1100      40.9        10       127        60
OIR    2025130    131400  -10.9100 -137.1200      40.9        10       124        60
OIR    2025130    131400  -10.9100 -137.1300      40.9        10       122        60
OIR    2025130    131400  -10.9100 -137.1400      40.9         9       120        60
OIR    2025130    131400  -10.9100 -137.1500      40.9         9       120        60
OIR    2025130    131400  -10.9100 -137.1600      40.9         9       121        60
OIR    2025130    131400  -10.9100 -137.1700      40.9         9       122        60
OIR    2025130    131400  -10.9100 -137.1800      40.9         9       123        60
OIR    2025130    131400  -10.9100 -137.1900      40.9         9       124        60
OIR    2025130    131400  -10.9100 -137.2000      40.9         9       125        60
OIR    2025130    131400  -10.9100 -137.2100      40.9         9       123        60
OIR    2025130    131400  -10.9100 -137.2200      40.9         9       120        60
OIR    2025130    131400  -10.9100 -137.2300      40.9         9       117        60
OIR    2025130    131400  -10.9100 -137.2400      40.8         9       116        60
OIR    2025130    131400  -10.9100 -137.2500      40.8         8       119        60
OIR    2025130    131400  -10.9100 -137.2600      40.7         8       120        60
OIR    2025130    131400  -10.9100 -137.2700      40.8         7       121        60
OIR    2025130    131400  -10.9100 -137.2800      40.7         6       121        60
OIR    2025130    131400  -10.9100 -137.2900      40.7         6       121        60
OIR    2025130    131400  -10.9100 -137.3000      40.7         6       120        60
OIR    2025130    131400  -10.9100 -137.3100      40.7         5       117        60
OIR    2025130    131400  -10.9100 -137.3200      40.7         5       117        60
OIR    2025130    131400  -10.9100 -137.3300      40.7         5       117        60
OIR    2025130    131400  -10.9100 -137.3400      40.7         5       117        60
OIR    2025130    131400  -10.9100 -137.3500      40.7         5       119        60
OIR    2025130    131400  -10.9100 -137.3600      40.6         4       120        60
OIR    2025130    131400  -10.9100 -137.3700      40.5         4       121        60
OIR    2025130    131400  -10.9100 -137.3800      40.4         3       124        60
OIR    2025130    131400  -10.9100 -137.3900      40.3         2       123        60
OIR    2025130    131400  -10.9100 -137.4000      40.1         1       121        60
OIR    2025130    131400  -10.9100 -137.4100      39.8       360       120        60
OIR    2025130    131400  -10.9100 -137.4200      39.4       359       121        60
OIR    2025130    131400  -10.9100 -137.4300      39.2       358       120        60
OIR    2025130    131400  -10.9100 -137.4400      39.0       357       120        60
OIR    2025130    131400  -10.9100 -137.4500      38.9       357       119        60
OIR    2025130    131400  -10.9100 -137.4600      38.9       357       117        60
OIR    2025130    131400  -10.9100 -137.4700      38.8       356       120        60
OIR    2025130    131400  -10.9100 -137.4800      38.8       356       120        60
OIR    2025130    131400  -10.9100 -137.4900      38.8       356       116        60
OIR    2025130    131400  -10.9100 -137.5000      38.7       356       117        60
OIR    2025130    131400  -10.9100 -137.5100      38.6       355       120        60
OIR    2025130    131400  -10.9100 -137.5200      38.5       355       122        60
OIR    2025130    131400  -10.9100 -137.5300      38.1       355       122        60
OIR    2025130    131400  -10.9100 -137.5400      37.7       354       121        60
OIR    2025130    131400  -10.9100 -137.5500      37.2       354       121        60
OIR    2025130    131400  -10.9100 -137.5600      36.9       354       122        60
OIR    2025130    131400  -10.9100 -137.5700      36.7       354       124        60
OIR    2025130    131400  -10.9100 -137.5800      36.6       354       125        60
OIR    2025130    131400  -10.9100 -137.5900      36.5       354       125        60
OIR    2025130    131400  -10.9100 -137.6000      36.5       353       126        60
OIR    2025130    131400  -10.9100 -137.6100      36.4       353       125        60
OIR    2025130    131400  -10.9100 -137.6200      36.3       353       124        60
OIR    2025130    131400  -10.9100 -137.6300      36.2       353       124        60
OIR    2025130    131400  -10.9100 -137.6400      36.1       353       127        60
OIR    2025130    131400  -10.9100 -137.6500      36.0       353       126        60
OIR    2025130    131400  -10.9100 -137.6600      35.9       353       126        60
OIR    2025130    131400  -10.9100 -137.6700      35.7       353       127        60
OIR    2025130    131400  -10.9100 -137.6800      35.5       352       128        60
OIR    2025130    131400  -10.9100 -137.6900      35.2       352       129        60
OIR    2025130    131400  -10.9100 -137.7000      34.9       352       130        60
OIR    2025130    131400  -10.9100 -137.7100      34.6       352       130        60
OIR    2025130    131400  -10.9100 -137.7200      34.2       351       131        60
OIR    2025130    131400  -10.9100 -137.7300      33.6       351       132        60
OIR    2025130    131400  -10.9100 -137.7400      33.2       351       133        60
OIR    2025130    131400  -10.9100 -137.7500      32.9       351       134        60
OIR    2025130    131400  -10.9100 -137.7600      32.7       351       134        60
OIR    2025130    131400  -10.9100 -137.7700      32.6       351       134        60
OIR    2025130    131400  -10.9100 -137.7800      32.2       351       133        60
OIR    2025130    131400  -10.9100 -137.7900      31.6       351       132        60
OIR    2025130    131400  -10.9100 -137.8000      30.3       351       132        60
OIR    2025130    131400  -10.9100 -137.8100      29.0       352       131        60
OIR    2025130    131400  -10.9100 -137.8200      28.2       352       132        60
OIR    2025130    131400  -10.9100 -137.8300      27.6       352       132        60
OIR    2025130    131400  -10.9100 -137.8400      27.3       352       132        60
OIR    2025130    131400  -10.9100 -137.8500      27.1       352       133        60
OIR    2025130    131400  -10.9100 -137.8600      27.0       352       133        60
OIR    2025130    131400  -10.9100 -137.8700      26.9       352       135        60
OIR    2025130    131400  -10.9100 -137.8800      26.9       352       137        60
OIR    2025130    131400  -10.9100 -137.8900      26.9       352       137        60
OIR    2025130    131400  -10.9100 -137.9000      26.8       352       137        60
OIR    2025130    131400  -10.9100 -137.9100      26.8       352       135        60
OIR    2025130    131400  -10.9100 -137.9200      26.8       353       135        60
OIR    2025130    131400  -10.9100 -137.9300      26.8       353       136        60
OIR    2025130    131400  -10.9100 -137.9400      26.7       353       139        60
OIR    2025130    131400  -10.9100 -137.9500      26.7       353       144        60
OIR    2025130    131400  -10.9100 -137.9600      26.7       352       146        60
OIR    2025130    131400  -10.9100 -137.9700      26.7       352       144        60
OIR    2025130    131400  -10.9100 -137.9800      26.7       352       143        60
OIR    2025130    131400  -10.9100 -137.9900      26.7       352       141        60
OIR    2025130    131400  -10.9100 -138.0000      26.7       352       140        60
OIR    2025130    131400  -10.9100 -138.0100      26.7       352       140        60
OIR    2025130    131400  -10.9100 -138.0200      26.7       352       139        60
OIR    2025130    131400  -10.9100 -138.0300      26.7       353       139        60
OIR    2025130    131400  -10.9100 -138.0400      26.7       353       139        60
OIR    2025130    131400  -10.9100 -138.0500      26.7       353       139        60
OIR    2025130    131400  -10.9100 -138.0600      26.7       353       140        60
OIR    2025130    131400  -10.9100 -138.0700      26.7       353       140        60
OIR    2025130    131400  -10.9100 -138.0800      26.7       353       139        60
OIR    2025130    131400  -10.9100 -138.0900      26.7       353       139        60
OIR    2025130    131400  -10.9100 -138.1000      26.7       354       139        60
OIR    2025130    131400  -10.9100 -138.1100      26.7       354       137        60
OIR    2025130    131400  -10.9100 -138.1200      26.7       354       136        60
OIR    2025130    131400  -10.9100 -138.1300      26.7       355       137        60
OIR    2025130    131400  -10.9100 -138.1400      26.7       355       138        60
OIR    2025130    131400  -10.9100 -138.1500      26.8       356       138        60
OIR    2025130    131400  -10.9100 -138.1600      26.8       357       138        60
OIR    2025130    131400  -10.9100 -138.1700      26.8       358       139        60
OIR    2025130    131400  -10.9100 -138.1800      26.9       358       141        60
OIR    2025130    131400  -10.9100 -138.1900      26.9       358       143        60
OIR    2025130    131400  -10.9100 -138.2000      26.9       358       146        60
OIR    2025130    131400  -10.9100 -138.2100      26.9       358       150        60
OIR    2025130    131400  -10.9100 -138.2200      26.9       358       150        60
OIR    2025130    131400  -10.9100 -138.2300      26.9       358       150        60
OIR    2025130    131400  -10.9100 -138.2400      26.9       358       151        60
OIR    2025130    131400  -10.9200 -136.6000      45.9        22       149        60
OIR    2025130    131400  -10.9200 -136.6100      45.8        22       141        60
OIR    2025130    131400  -10.9200 -136.6200      45.7        22       140        60
OIR    2025130    131400  -10.9200 -136.6300      45.6        22       139        60
OIR    2025130    131400  -10.9200 -136.6400      45.6        22       138        60
OIR    2025130    131400  -10.9200 -136.6500      45.5        21       137        60
OIR    2025130    131400  -10.9200 -136.6600      45.4        21       136        60
OIR    2025130    131400  -10.9200 -136.6700      45.1        21       135        60
OIR    2025130    131400  -10.9200 -136.6800      44.3        20       134        60
OIR    2025130    131400  -10.9200 -136.6900      43.2        19       133        60
OIR    2025130    131400  -10.9200 -136.7000      42.5        19       132        60
OIR    2025130    131400  -10.9200 -136.7100      41.9        19       131        60
OIR    2025130    131400  -10.9200 -136.7200      41.7        19       131        60
OIR    2025130    131400  -10.9200 -136.7300      41.7        19       127        60
OIR    2025130    131400  -10.9200 -136.7400      41.6        19       123        60
OIR    2025130    131400  -10.9200 -136.7500      41.4        19       121        60
OIR    2025130    131400  -10.9200 -136.7600      41.3        19       120        60
OIR    2025130    131400  -10.9200 -136.7700      41.3        19       123        60
OIR    2025130    131400  -10.9200 -136.7800      41.2        19       126        60
OIR    2025130    131400  -10.9200 -136.7900      41.2        19       129        60
OIR    2025130    131400  -10.9200 -136.8000      41.2        19       132        60
OIR    2025130    131400  -10.9200 -136.8100      41.1        19       136        60
OIR    2025130    131400  -10.9200 -136.8200      41.1        19       138        60
OIR    2025130    131400  -10.9200 -136.8300      41.0        18       140        60
OIR    2025130    131400  -10.9200 -136.8400      41.0        18       138        60
OIR    2025130    131400  -10.9200 -136.8500      40.9        18       135        60
OIR    2025130    131400  -10.9200 -136.8600      40.9        18       134        60
OIR    2025130    131400  -10.9200 -136.8700      40.8        18       133        60
OIR    2025130    131400  -10.9200 -136.8800      40.8        18       132        60
OIR    2025130    131400  -10.9200 -136.8900      40.8        18       132        60
OIR    2025130    131400  -10.9200 -136.9000      40.7        18       135        60
OIR    2025130    131400  -10.9200 -136.9100      40.7        18       136        60
OIR    2025130    131400  -10.9200 -136.9200      40.7        18       135        60
OIR    2025130    131400  -10.9200 -136.9300      40.7        18       136        60
OIR    2025130    131400  -10.9200 -136.9400      40.6        18       138        60
OIR    2025130    131400  -10.9200 -136.9500      40.6        18       139        60
OIR    2025130    131400  -10.9200 -136.9600      40.6        18       138        60
OIR    2025130    131400  -10.9200 -136.9700      40.5        17       135        60
OIR    2025130    131400  -10.9200 -136.9800      40.4        17       132        60
OIR    2025130    131400  -10.9200 -136.9900      40.1        16       128        60
OIR    2025130    131400  -10.9200 -137.0000      40.0        15       125        60
OIR    2025130    131400  -10.9200 -137.0100      40.0        15       126        60
OIR    2025130    131400  -10.9200 -137.0200      40.0        14       125        60
OIR    2025130    131400  -10.9200 -137.0300      40.0        14       123        60
OIR    2025130    131400  -10.9200 -137.0400      40.0        14       123        60
OIR    2025130    131400  -10.9200 -137.0500      40.0        14       125        60
OIR    2025130    131400  -10.9200 -137.0600      40.0        14       127        60
OIR    2025130    131400  -10.9200 -137.0700      40.1        13       127        60
OIR    2025130    131400  -10.9200 -137.0800      40.2        13       127        60
OIR    2025130    131400  -10.9200 -137.0900      40.4        12       127        60
OIR    2025130    131400  -10.9200 -137.1000      40.8        10       127        60
OIR    2025130    131400  -10.9200 -137.1100      40.9        10       127        60
OIR    2025130    131400  -10.9200 -137.1200      40.9        10       124        60
OIR    2025130    131400  -10.9200 -137.1300      40.9         9       122        60
OIR    2025130    131400  -10.9200 -137.1400      40.9         9       120        60
OIR    2025130    131400  -10.9200 -137.1500      40.9         9       119        60
OIR    2025130    131400  -10.9200 -137.1600      40.9         9       121        60
OIR    2025130    131400  -10.9200 -137.1700      40.9         9       123        60
OIR    2025130    131400  -10.9200 -137.1800      40.9         9       124        60
OIR    2025130    131400  -10.9200 -137.1900      40.9         9       124        60
OIR    2025130    131400  -10.9200 -137.2000      40.9         9       125        60
OIR    2025130    131400  -10.9200 -137.2100      40.9         9       123        60
OIR    2025130    131400  -10.9200 -137.2200      40.9         9       120        60
OIR    2025130    131400  -10.9200 -137.2300      40.8         9       119        60
OIR    2025130    131400  -10.9200 -137.2400      40.8         9       120        60
OIR    2025130    131400  -10.9200 -137.2500      40.7         8       121        60
OIR    2025130    131400  -10.9200 -137.2600      40.7         7       122        60
OIR    2025130    131400  -10.9200 -137.2700      40.7         7       122        60
OIR    2025130    131400  -10.9200 -137.2800      40.7         6       123        60
OIR    2025130    131400  -10.9200 -137.2900      40.7         6       124        60
OIR    2025130    131400  -10.9200 -137.3000      40.7         6       123        60
OIR    2025130    131400  -10.9200 -137.3100      40.7         5       121        60
OIR    2025130    131400  -10.9200 -137.3200      40.7         5       120        60
OIR    2025130    131400  -10.9200 -137.3300      40.7         5       119        60
OIR    2025130    131400  -10.9200 -137.3400      40.7         5       117        60
OIR    2025130    131400  -10.9200 -137.3500      40.7         5       117        60
OIR    2025130    131400  -10.9200 -137.3600      40.6         4       119        60
OIR    2025130    131400  -10.9200 -137.3700      40.5         3       121        60
OIR    2025130    131400  -10.9200 -137.3800      40.4         3       121        60
OIR    2025130    131400  -10.9200 -137.3900      40.4         2       120        60
OIR    2025130    131400  -10.9200 -137.4000      40.2         1       119        60
OIR    2025130    131400  -10.9200 -137.4100      40.1         0       120        60
OIR    2025130    131400  -10.9200 -137.4200      39.9       359       123        60
OIR    2025130    131400  -10.9200 -137.4300      39.8       358       122        60
OIR    2025130    131400  -10.9200 -137.4400      39.6       358       121        60
OIR    2025130    131400  -10.9200 -137.4500      39.5       357       120        60
OIR    2025130    131400  -10.9200 -137.4600      39.4       357       119        60
OIR    2025130    131400  -10.9200 -137.4700      39.3       356       122        60
OIR    2025130    131400  -10.9200 -137.4800      39.2       356       122        60
OIR    2025130    131400  -10.9200 -137.4900      39.2       356       117        60
OIR    2025130    131400  -10.9200 -137.5000      39.2       356       119        60
OIR    2025130    131400  -10.9200 -137.5100      39.2       355       122        60
OIR    2025130    131400  -10.9200 -137.5200      39.0       355       124        60
OIR    2025130    131400  -10.9200 -137.5300      38.6       355       125        60
OIR    2025130    131400  -10.9200 -137.5400      38.0       355       125        60
OIR    2025130    131400  -10.9200 -137.5500      37.4       354       124        60
OIR    2025130    131400  -10.9200 -137.5600      36.9       354       124        60
OIR    2025130    131400  -10.9200 -137.5700      36.7       354       125        60
OIR    2025130    131400  -10.9200 -137.5800      36.6       354       125        60
OIR    2025130    131400  -10.9200 -137.5900      36.5       353       125        60
OIR    2025130    131400  -10.9200 -137.6000      36.4       353       125        60
OIR    2025130    131400  -10.9200 -137.6100      36.3       353       125        60
OIR    2025130    131400  -10.9200 -137.6200      36.3       353       124        60
OIR    2025130    131400  -10.9200 -137.6300      36.2       353       126        60
OIR    2025130    131400  -10.9200 -137.6400      36.1       353       128        60
OIR    2025130    131400  -10.9200 -137.6500      36.0       353       128        60
OIR    2025130    131400  -10.9200 -137.6600      35.8       353       128        60
OIR    2025130    131400  -10.9200 -137.6700      35.6       352       129        60
OIR    2025130    131400  -10.9200 -137.6800      35.4       352       130        60
OIR    2025130    131400  -10.9200 -137.6900      35.1       352       131        60
OIR    2025130    131400  -10.9200 -137.7000      34.8       352       132        60
OIR    2025130    131400  -10.9200 -137.7100      34.5       352       132        60
OIR    2025130    131400  -10.9200 -137.7200      34.0       351       132        60
OIR    2025130    131400  -10.9200 -137.7300      33.5       351       132        60
OIR    2025130    131400  -10.9200 -137.7400      33.1       351       133        60
OIR    2025130    131400  -10.9200 -137.7500      32.9       351       133        60
OIR    2025130    131400  -10.9200 -137.7600      32.7       351       133        60
OIR    2025130    131400  -10.9200 -137.7700      32.4       351       133        60
OIR    2025130    131400  -10.9200 -137.7800      31.9       351       133        60
OIR    2025130    131400  -10.9200 -137.7900      30.9       351       133        60
OIR    2025130    131400  -10.9200 -137.8000      29.6       351       132        60
OIR    2025130    131400  -10.9200 -137.8100      28.5       351       132        60
OIR    2025130    131400  -10.9200 -137.8200      27.8       352       132        60
OIR    2025130    131400  -10.9200 -137.8300      27.4       352       133        60
OIR    2025130    131400  -10.9200 -137.8400      27.1       352       134        60
OIR    2025130    131400  -10.9200 -137.8500      27.0       352       134        60
OIR    2025130    131400  -10.9200 -137.8600      26.9       352       134        60
OIR    2025130    131400  -10.9200 -137.8700      26.8       352       136        60
OIR    2025130    131400  -10.9200 -137.8800      26.8       352       138        60
OIR    2025130    131400  -10.9200 -137.8900      26.8       352       138        60
OIR    2025130    131400  -10.9200 -137.9000      26.8       352       138        60
OIR    2025130    131400  -10.9200 -137.9100      26.8       352       136        60
OIR    2025130    131400  -10.9200 -137.9200      26.7       352       137        60
OIR    2025130    131400  -10.9200 -137.9300      26.7       352       139        60
OIR    2025130    131400  -10.9200 -137.9400      26.7       353       141        60
OIR    2025130    131400  -10.9200 -137.9500      26.7       352       146        60
OIR    2025130    131400  -10.9200 -137.9600      26.7       352       148        60
OIR    2025130    131400  -10.9200 -137.9700      26.7       352       147        60
OIR    2025130    131400  -10.9200 -137.9800      26.7       352       145        60
OIR    2025130    131400  -10.9200 -137.9900      26.7       352       143        60
OIR    2025130    131400  -10.9200 -138.0000      26.7       352       142        60
OIR    2025130    131400  -10.9200 -138.0100      26.7       352       141        60
OIR    2025130    131400  -10.9200 -138.0200      26.7       352       141        60
OIR    2025130    131400  -10.9200 -138.0300      26.7       352       140        60
OIR    2025130    131400  -10.9200 -138.0400      26.7       353       140        60
OIR    2025130    131400  -10.9200 -138.0500      26.7       353       139        60
OIR    2025130    131400  -10.9200 -138.0600      26.7       353       138        60
OIR    2025130    131400  -10.9200 -138.0700      26.7       353       138        60
OIR    2025130    131400  -10.9200 -138.0800      26.7       353       138        60
OIR    2025130    131400  -10.9200 -138.0900      26.7       353       138        60
OIR    2025130    131400  -10.9200 -138.1000      26.7       353       137        60
OIR    2025130    131400  -10.9200 -138.1100      26.7       354       137        60
OIR    2025130    131400  -10.9200 -138.1200      26.7       354       137        60
OIR    2025130    131400  -10.9200 -138.1300      26.7       354       138        60
OIR    2025130    131400  -10.9200 -138.1400      26.7       355       140        60
OIR    2025130    131400  -10.9200 -138.1500      26.7       356       139        60
OIR    2025130    131400  -10.9200 -138.1600      26.8       357       138        60
OIR    2025130    131400  -10.9200 -138.1700      26.8       357       140        60
OIR    2025130    131400  -10.9200 -138.1800      26.8       358       141        60
OIR    2025130    131400  -10.9200 -138.1900      26.9       358       143        60
OIR    2025130    131400  -10.9200 -138.2000      26.9       358       146        60
OIR    2025130    131400  -10.9200 -138.2100      26.9       358       149        60
OIR    2025130    131400  -10.9200 -138.2200      26.9       358       150        60
OIR    2025130    131400  -10.9200 -138.2300      26.9       358       150        60
OIR    2025130    131400  -10.9200 -138.2400      26.9       358       151        60
OIR    2025130    131400  -10.9300 -136.6000      45.7        22       148        60
OIR    2025130    131400  -10.9300 -136.6100      45.6        22       142        60
OIR    2025130    131400  -10.9300 -136.6200      45.5        22       141        60
OIR    2025130    131400  -10.9300 -136.6300      45.4        21       139        60
OIR    2025130    131400  -10.9300 -136.6400      45.4        21       139        60
OIR    2025130    131400  -10.9300 -136.6500      45.3        21       138        60
OIR    2025130    131400  -10.9300 -136.6600      45.3        21       136        60
OIR    2025130    131400  -10.9300 -136.6700      45.0        21       134        60
OIR    2025130    131400  -10.9300 -136.6800      44.1        20       132        60
OIR    2025130    131400  -10.9300 -136.6900      42.9        19       131        60
OIR    2025130    131400  -10.9300 -136.7000      42.3        19       131        60
OIR    2025130    131400  -10.9300 -136.7100      41.8        19       130        60
OIR    2025130    131400  -10.9300 -136.7200      41.7        19       130        60
OIR    2025130    131400  -10.9300 -136.7300      41.6        19       127        60
OIR    2025130    131400  -10.9300 -136.7400      41.4        19       123        60
OIR    2025130    131400  -10.9300 -136.7500      41.3        19       120        60
OIR    2025130    131400  -10.9300 -136.7600      41.2        19       120        60
OIR    2025130    131400  -10.9300 -136.7700      41.2        19       124        60
OIR    2025130    131400  -10.9300 -136.7800      41.2        19       128        60
OIR    2025130    131400  -10.9300 -136.7900      41.2        19       131        60
OIR    2025130    131400  -10.9300 -136.8000      41.1        19       134        60
OIR    2025130    131400  -10.9300 -136.8100      41.1        19       138        60
OIR    2025130    131400  -10.9300 -136.8200      41.0        19       139        60
OIR    2025130    131400  -10.9300 -136.8300      41.0        18       140        60
OIR    2025130    131400  -10.9300 -136.8400      40.9        18       139        60
OIR    2025130    131400  -10.9300 -136.8500      40.9        18       137        60
OIR    2025130    131400  -10.9300 -136.8600      40.8        18       135        60
OIR    2025130    131400  -10.9300 -136.8700      40.8        18       133        60
OIR    2025130    131400  -10.9300 -136.8800      40.8        18       133        60
OIR    2025130    131400  -10.9300 -136.8900      40.7        18       133        60
OIR    2025130    131400  -10.9300 -136.9000      40.7        18       136        60
OIR    2025130    131400  -10.9300 -136.9100      40.7        18       137        60
OIR    2025130    131400  -10.9300 -136.9200      40.7        18       136        60
OIR    2025130    131400  -10.9300 -136.9300      40.6        18       137        60
OIR    2025130    131400  -10.9300 -136.9400      40.6        18       138        60
OIR    2025130    131400  -10.9300 -136.9500      40.6        18       137        60
OIR    2025130    131400  -10.9300 -136.9600      40.6        18       135        60
OIR    2025130    131400  -10.9300 -136.9700      40.4        17       133        60
OIR    2025130    131400  -10.9300 -136.9800      40.2        16       131        60
OIR    2025130    131400  -10.9300 -136.9900      40.1        15       129        60
OIR    2025130    131400  -10.9300 -137.0000      40.0        15       128        60
OIR    2025130    131400  -10.9300 -137.0100      40.0        15       131        60
OIR    2025130    131400  -10.9300 -137.0200      40.0        14       130        60
OIR    2025130    131400  -10.9300 -137.0300      40.0        14       126        60
OIR    2025130    131400  -10.9300 -137.0400      40.0        14       125        60
OIR    2025130    131400  -10.9300 -137.0500      40.0        14       128        60
OIR    2025130    131400  -10.9300 -137.0600      40.0        14       128        60
OIR    2025130    131400  -10.9300 -137.0700      40.1        13       128        60
OIR    2025130    131400  -10.9300 -137.0800      40.2        13       128        60
OIR    2025130    131400  -10.9300 -137.0900      40.5        11       128        60
OIR    2025130    131400  -10.9300 -137.1000      40.8        10       127        60
OIR    2025130    131400  -10.9300 -137.1100      40.9        10       126        60
OIR    2025130    131400  -10.9300 -137.1200      40.9         9       122        60
OIR    2025130    131400  -10.9300 -137.1300      40.9         9       120        60
OIR    2025130    131400  -10.9300 -137.1400      40.9         9       117        60
OIR    2025130    131400  -10.9300 -137.1500      40.9         9       117        60
OIR    2025130    131400  -10.9300 -137.1600      40.9         9       121        60
OIR    2025130    131400  -10.9300 -137.1700      40.9         9       122        60
OIR    2025130    131400  -10.9300 -137.1800      40.9         9       122        60
OIR    2025130    131400  -10.9300 -137.1900      40.9         9       122        60
OIR    2025130    131400  -10.9300 -137.2000      40.9         9       122        60
OIR    2025130    131400  -10.9300 -137.2100      40.8         9       121        60
OIR    2025130    131400  -10.9300 -137.2200      40.8         9       121        60
OIR    2025130    131400  -10.9300 -137.2300      40.8         9       121        60
OIR    2025130    131400  -10.9300 -137.2400      40.7         8       122        60
OIR    2025130    131400  -10.9300 -137.2500      40.6         8       123        60
OIR    2025130    131400  -10.9300 -137.2600      40.6         7       124        60
OIR    2025130    131400  -10.9300 -137.2700      40.6         7       123        60
OIR    2025130    131400  -10.9300 -137.2800      40.6         7       126        60
OIR    2025130    131400  -10.9300 -137.2900      40.6         6       129        60
OIR    2025130    131400  -10.9300 -137.3000      40.6         6       127        60
OIR    2025130    131400  -10.9300 -137.3100      40.6         5       126        60
OIR    2025130    131400  -10.9300 -137.3200      40.7         5       123        60
OIR    2025130    131400  -10.9300 -137.3300      40.7         5       121        60
OIR    2025130    131400  -10.9300 -137.3400      40.7         5       120        60
OIR    2025130    131400  -10.9300 -137.3500      40.7         4       117        60
OIR    2025130    131400  -10.9300 -137.3600      40.5         4       117        60
OIR    2025130    131400  -10.9300 -137.3700      40.4         3       117        60
OIR    2025130    131400  -10.9300 -137.3800      40.3         2       116        60
OIR    2025130    131400  -10.9300 -137.3900      40.2         1       115        60
OIR    2025130    131400  -10.9300 -137.4000      40.1         1       114        60
OIR    2025130    131400  -10.9300 -137.4100      40.1         0       116        60
OIR    2025130    131400  -10.9300 -137.4200      40.0       359       122        60
OIR    2025130    131400  -10.9300 -137.4300      39.9       358       121        60
OIR    2025130    131400  -10.9300 -137.4400      39.8       357       119        60
OIR    2025130    131400  -10.9300 -137.4500      39.7       357       119        60
OIR    2025130    131400  -10.9300 -137.4600      39.6       357       119        60
OIR    2025130    131400  -10.9300 -137.4700      39.5       356       123        60
OIR    2025130    131400  -10.9300 -137.4800      39.5       356       124        60
OIR    2025130    131400  -10.9300 -137.4900      39.5       356       123        60
OIR    2025130    131400  -10.9300 -137.5000      39.5       356       123        60
OIR    2025130    131400  -10.9300 -137.5100      39.5       356       125        60
OIR    2025130    131400  -10.9300 -137.5200      39.5       356       126        60
OIR    2025130    131400  -10.9300 -137.5300      39.2       355       128        60
OIR    2025130    131400  -10.9300 -137.5400      38.6       355       128        60
OIR    2025130    131400  -10.9300 -137.5500      37.6       354       128        60
OIR    2025130    131400  -10.9300 -137.5600      36.9       354       127        60
OIR    2025130    131400  -10.9300 -137.5700      36.6       354       125        60
OIR    2025130    131400  -10.9300 -137.5800      36.5       354       125        60
OIR    2025130    131400  -10.9300 -137.5900      36.4       353       124        60
OIR    2025130    131400  -10.9300 -137.6000      36.4       353       124        60
OIR    2025130    131400  -10.9300 -137.6100      36.3       353       124        60
OIR    2025130    131400  -10.9300 -137.6200      36.2       353       125        60
OIR    2025130    131400  -10.9300 -137.6300      36.1       353       127        60
OIR    2025130    131400  -10.9300 -137.6400      36.0       353       129        60
OIR    2025130    131400  -10.9300 -137.6500      35.9       353       130        60
OIR    2025130    131400  -10.9300 -137.6600      35.8       352       132        60
OIR    2025130    131400  -10.9300 -137.6700      35.6       352       132        60
OIR    2025130    131400  -10.9300 -137.6800      35.4       352       133        60
OIR    2025130    131400  -10.9300 -137.6900      35.1       352       133        60
OIR    2025130    131400  -10.9300 -137.7000      34.7       352       133        60
OIR    2025130    131400  -10.9300 -137.7100      34.2       351       132        60
OIR    2025130    131400  -10.9300 -137.7200      33.8       351       132        60
OIR    2025130    131400  -10.9300 -137.7300      33.4       351       132        60
OIR    2025130    131400  -10.9300 -137.7400      33.0       351       132        60
OIR    2025130    131400  -10.9300 -137.7500      32.8       351       132        60
OIR    2025130    131400  -10.9300 -137.7600      32.6       351       132        60
OIR    2025130    131400  -10.9300 -137.7700      32.1       351       132        60
OIR    2025130    131400  -10.9300 -137.7800      31.4       351       132        60
OIR    2025130    131400  -10.9300 -137.7900      30.3       351       133        60
OIR    2025130    131400  -10.9300 -137.8000      29.1       351       132        60
OIR    2025130    131400  -10.9300 -137.8100      28.3       351       132        60
OIR    2025130    131400  -10.9300 -137.8200      27.5       351       133        60
OIR    2025130    131400  -10.9300 -137.8300      27.2       351       133        60
OIR    2025130    131400  -10.9300 -137.8400      27.0       352       135        60
OIR    2025130    131400  -10.9300 -137.8500      26.9       352       136        60
OIR    2025130    131400  -10.9300 -137.8600      26.8       352       137        60
OIR    2025130    131400  -10.9300 -137.8700      26.8       352       138        60
OIR    2025130    131400  -10.9300 -137.8800      26.7       352       139        60
OIR    2025130    131400  -10.9300 -137.8900      26.7       352       140        60
OIR    2025130    131400  -10.9300 -137.9000      26.7       352       139        60
OIR    2025130    131400  -10.9300 -137.9100      26.7       352       138        60
OIR    2025130    131400  -10.9300 -137.9200      26.7       352       139        60
OIR    2025130    131400  -10.9300 -137.9300      26.7       352       142        60
OIR    2025130    131400  -10.9300 -137.9400      26.7       352       145        60
OIR    2025130    131400  -10.9300 -137.9500      26.7       352       148        60
OIR    2025130    131400  -10.9300 -137.9600      26.7       352       149        60
OIR    2025130    131400  -10.9300 -137.9700      26.7       352       149        60
OIR    2025130    131400  -10.9300 -137.9800      26.7       352       147        60
OIR    2025130    131400  -10.9300 -137.9900      26.7       352       145        60
OIR    2025130    131400  -10.9300 -138.0000      26.7       352       144        60
OIR    2025130    131400  -10.9300 -138.0100      26.7       352       143        60
OIR    2025130    131400  -10.9300 -138.0200      26.7       352       143        60
OIR    2025130    131400  -10.9300 -138.0300      26.7       352       142        60
OIR    2025130    131400  -10.9300 -138.0400      26.7       352       141        60
OIR    2025130    131400  -10.9300 -138.0500      26.7       352       139        60
OIR    2025130    131400  -10.9300 -138.0600      26.7       353       137        60
OIR    2025130    131400  -10.9300 -138.0700      26.7       353       136        60
OIR    2025130    131400  -10.9300 -138.0800      26.7       353       136        60
OIR    2025130    131400  -10.9300 -138.0900      26.7       353       136        60
OIR    2025130    131400  -10.9300 -138.1000      26.7       353       136        60
OIR    2025130    131400  -10.9300 -138.1100      26.7       353       137        60
OIR    2025130    131400  -10.9300 -138.1200      26.7       354       139        60
OIR    2025130    131400  -10.9300 -138.1300      26.7       354       140        60
OIR    2025130    131400  -10.9300 -138.1400      26.7       354       142        60
OIR    2025130    131400  -10.9300 -138.1500      26.7       355       140        60
OIR    2025130    131400  -10.9300 -138.1600      26.8       356       139        60
OIR    2025130    131400  -10.9300 -138.1700      26.8       357       141        60
OIR    2025130    131400  -10.9300 -138.1800      26.8       357       142        60
OIR    2025130    131400  -10.9300 -138.1900      26.8       358       143        60
OIR    2025130    131400  -10.9300 -138.2000      26.9       358       145        60
OIR    2025130    131400  -10.9300 -138.2100      26.9       358       148        60
OIR    2025130    131400  -10.9300 -138.2200      26.9       358       150        60
OIR    2025130    131400  -10.9300 -138.2300      26.9       358       150        60
OIR    2025130    131400  -10.9400 -136.5900      45.6        22       151        60
OIR    2025130    131400  -10.9400 -136.6000      45.4        22       147        60
OIR    2025130    131400  -10.9400 -136.6100      45.4        22       143        60
OIR    2025130    131400  -10.9400 -136.6200      45.3        21       141        60
OIR    2025130    131400  -10.9400 -136.6300      45.2        21       139        60
OIR    2025130    131400  -10.9400 -136.6400      45.2        21       140        60
OIR    2025130    131400  -10.9400 -136.6500      45.2        21       140        60
OIR    2025130    131400  -10.9400 -136.6600      45.1        21       138        60
OIR    2025130    131400  -10.9400 -136.6700      44.7        21       135        60
OIR    2025130    131400  -10.9400 -136.6800      43.9        20       133        60
OIR    2025130    131400  -10.9400 -136.6900      42.6        19       131        60
OIR    2025130    131400  -10.9400 -136.7000      42.0        19       131        60
OIR    2025130    131400  -10.9400 -136.7100      41.6        19       131        60
OIR    2025130    131400  -10.9400 -136.7200      41.5        19       131        60
OIR    2025130    131400  -10.9400 -136.7300      41.4        19       127        60
OIR    2025130    131400  -10.9400 -136.7400      41.3        19       123        60
OIR    2025130    131400  -10.9400 -136.7500      41.2        19       122        60
OIR    2025130    131400  -10.9400 -136.7600      41.2        19       122        60
OIR    2025130    131400  -10.9400 -136.7700      41.1        19       126        60
OIR    2025130    131400  -10.9400 -136.7800      41.1        19       130        60
OIR    2025130    131400  -10.9400 -136.7900      41.1        19       132        60
OIR    2025130    131400  -10.9400 -136.8000      41.1        19       135        60
OIR    2025130    131400  -10.9400 -136.8100      41.0        19       140        60
OIR    2025130    131400  -10.9400 -136.8200      41.0        18       141        60
OIR    2025130    131400  -10.9400 -136.8300      40.9        18       140        60
OIR    2025130    131400  -10.9400 -136.8400      40.9        18       139        60
OIR    2025130    131400  -10.9400 -136.8500      40.8        18       138        60
OIR    2025130    131400  -10.9400 -136.8600      40.8        18       136        60
OIR    2025130    131400  -10.9400 -136.8700      40.8        18       134        60
OIR    2025130    131400  -10.9400 -136.8800      40.7        18       134        60
OIR    2025130    131400  -10.9400 -136.8900      40.7        18       134        60
OIR    2025130    131400  -10.9400 -136.9000      40.7        18       137        60
OIR    2025130    131400  -10.9400 -136.9100      40.7        18       138        60
OIR    2025130    131400  -10.9400 -136.9200      40.6        18       137        60
OIR    2025130    131400  -10.9400 -136.9300      40.6        18       138        60
OIR    2025130    131400  -10.9400 -136.9400      40.6        18       138        60
OIR    2025130    131400  -10.9400 -136.9500      40.6        18       137        60
OIR    2025130    131400  -10.9400 -136.9600      40.5        17       135        60
OIR    2025130    131400  -10.9400 -136.9700      40.4        16       133        60
OIR    2025130    131400  -10.9400 -136.9800      40.1        15       132        60
OIR    2025130    131400  -10.9400 -136.9900      40.0        15       131        60
OIR    2025130    131400  -10.9400 -137.0000      40.0        15       131        60
OIR    2025130    131400  -10.9400 -137.0100      40.0        15       134        60
OIR    2025130    131400  -10.9400 -137.0200      40.0        14       135        60
OIR    2025130    131400  -10.9400 -137.0300      40.0        14       132        60
OIR    2025130    131400  -10.9400 -137.0400      40.0        14       130        60
OIR    2025130    131400  -10.9400 -137.0500      40.0        14       131        60
OIR    2025130    131400  -10.9400 -137.0600      39.9        13       131        60
OIR    2025130    131400  -10.9400 -137.0700      40.0        13       130        60
OIR    2025130    131400  -10.9400 -137.0800      40.1        12       130        60
OIR    2025130    131400  -10.9400 -137.0900      40.5        11       130        60
OIR    2025130    131400  -10.9400 -137.1000      40.8        10       128        60
OIR    2025130    131400  -10.9400 -137.1100      40.9        10       125        60
OIR    2025130    131400  -10.9400 -137.1200      40.9         9       121        60
OIR    2025130    131400  -10.9400 -137.1300      40.9         9       120        60
OIR    2025130    131400  -10.9400 -137.1400      40.9         9       119        60
OIR    2025130    131400  -10.9400 -137.1500      40.9         9       120        60
OIR    2025130    131400  -10.9400 -137.1600      40.9         9       122        60
OIR    2025130    131400  -10.9400 -137.1700      40.8         9       123        60
OIR    2025130    131400  -10.9400 -137.1800      40.8         9       123        60
OIR    2025130    131400  -10.9400 -137.1900      40.8         9       122        60
OIR    2025130    131400  -10.9400 -137.2000      40.8         9       121        60
OIR    2025130    131400  -10.9400 -137.2100      40.8         9       121        60
OIR    2025130    131400  -10.9400 -137.2200      40.7         9       121        60
OIR    2025130    131400  -10.9400 -137.2300      40.6         9       122        60
OIR    2025130    131400  -10.9400 -137.2400      40.6         8       123        60
OIR    2025130    131400  -10.9400 -137.2500      40.5         8       124        60
OIR    2025130    131400  -10.9400 -137.2600      40.5         7       124        60
OIR    2025130    131400  -10.9400 -137.2700      40.5         7       123        60
OIR    2025130    131400  -10.9400 -137.2800      40.5         7       126        60
OIR    2025130    131400  -10.9400 -137.2900      40.6         6       130        60
OIR    2025130    131400  -10.9400 -137.3000      40.5         6       130        60
OIR    2025130    131400  -10.9400 -137.3100      40.5         5       129        60
OIR    2025130    131400  -10.9400 -137.3200      40.6         5       128        60
OIR    2025130    131400  -10.9400 -137.3300      40.6         5       126        60
OIR    2025130    131400  -10.9400 -137.3400      40.6         5       123        60
OIR    2025130    131400  -10.9400 -137.3500      40.7         4       121        60
OIR    2025130    131400  -10.9400 -137.3600      40.6         3       120        60
OIR    2025130    131400  -10.9400 -137.3700      40.6         3       120        60
OIR    2025130    131400  -10.9400 -137.3800      40.5         2       120        60
OIR    2025130    131400  -10.9400 -137.3900      40.4         1       120        60
OIR    2025130    131400  -10.9400 -137.4000      40.3         1       119        60
OIR    2025130    131400  -10.9400 -137.4100      40.3         0       120        60
OIR    2025130    131400  -10.9400 -137.4200      40.2       359       123        60
OIR    2025130    131400  -10.9400 -137.4300      40.0       358       121        60
OIR    2025130    131400  -10.9400 -137.4400      39.9       357       119        60
OIR    2025130    131400  -10.9400 -137.4500      39.8       357       120        60
OIR    2025130    131400  -10.9400 -137.4600      39.7       357       121        60
OIR    2025130    131400  -10.9400 -137.4700      39.7       356       124        60
OIR    2025130    131400  -10.9400 -137.4800      39.6       356       125        60
OIR    2025130    131400  -10.9400 -137.4900      39.6       356       124        60
OIR    2025130    131400  -10.9400 -137.5000      39.7       356       126        60
OIR    2025130    131400  -10.9400 -137.5100      39.7       356       128        60
OIR    2025130    131400  -10.9400 -137.5200      39.6       356       131        60
OIR    2025130    131400  -10.9400 -137.5300      39.5       356       133        60
OIR    2025130    131400  -10.9400 -137.5400      39.1       355       134        60
OIR    2025130    131400  -10.9400 -137.5500      37.8       354       133        60
OIR    2025130    131400  -10.9400 -137.5600      36.9       354       131        60
OIR    2025130    131400  -10.9400 -137.5700      36.6       354       129        60
OIR    2025130    131400  -10.9400 -137.5800      36.5       354       128        60
OIR    2025130    131400  -10.9400 -137.5900      36.4       353       128        60
OIR    2025130    131400  -10.9400 -137.6000      36.3       353       127        60
OIR    2025130    131400  -10.9400 -137.6100      36.2       353       127        60
OIR    2025130    131400  -10.9400 -137.6200      36.1       353       129        60
OIR    2025130    131400  -10.9400 -137.6300      36.0       353       130        60
OIR    2025130    131400  -10.9400 -137.6400      36.0       353       133        60
OIR    2025130    131400  -10.9400 -137.6500      35.8       352       134        60
OIR    2025130    131400  -10.9400 -137.6600      35.7       352       135        60
OIR    2025130    131400  -10.9400 -137.6700      35.5       352       134        60
OIR    2025130    131400  -10.9400 -137.6800      35.3       352       133        60
OIR    2025130    131400  -10.9400 -137.6900      35.0       352       133        60
OIR    2025130    131400  -10.9400 -137.7000      34.5       351       132        60
OIR    2025130    131400  -10.9400 -137.7100      34.0       351       132        60
OIR    2025130    131400  -10.9400 -137.7200      33.6       351       132        60
OIR    2025130    131400  -10.9400 -137.7300      33.2       351       132        60
OIR    2025130    131400  -10.9400 -137.7400      33.0       351       132        60
OIR    2025130    131400  -10.9400 -137.7500      32.7       351       132        60
OIR    2025130    131400  -10.9400 -137.7600      32.3       351       132        60
OIR    2025130    131400  -10.9400 -137.7700      31.7       351       131        60
OIR    2025130    131400  -10.9400 -137.7800      31.1       351       132        60
OIR    2025130    131400  -10.9400 -137.7900      30.0       351       133        60
OIR    2025130    131400  -10.9400 -137.8000      28.7       351       133        60
OIR    2025130    131400  -10.9400 -137.8100      27.8       351       134        60
OIR    2025130    131400  -10.9400 -137.8200      27.3       351       135        60
OIR    2025130    131400  -10.9400 -137.8300      27.0       351       136        60
OIR    2025130    131400  -10.9400 -137.8400      26.9       351       138        60
OIR    2025130    131400  -10.9400 -137.8500      26.8       352       139        60
OIR    2025130    131400  -10.9400 -137.8600      26.7       352       139        60
OIR    2025130    131400  -10.9400 -137.8700      26.7       352       140        60
OIR    2025130    131400  -10.9400 -137.8800      26.7       352       141        60
OIR    2025130    131400  -10.9400 -137.8900      26.6       352       141        60
OIR    2025130    131400  -10.9400 -137.9000      26.6       352       141        60
OIR    2025130    131400  -10.9400 -137.9100      26.6       352       143        60
OIR    2025130    131400  -10.9400 -137.9200      26.6       352       144        60
OIR    2025130    131400  -10.9400 -137.9300      26.6       352       146        60
OIR    2025130    131400  -10.9400 -137.9400      26.7       352       147        60
OIR    2025130    131400  -10.9400 -137.9500      26.7       352       149        60
OIR    2025130    131400  -10.9400 -137.9600      26.7       352       150        60
OIR    2025130    131400  -10.9400 -137.9700      26.7       352       151        60
OIR    2025130    131400  -10.9400 -137.9800      26.7       352       149        60
OIR    2025130    131400  -10.9400 -137.9900      26.7       352       147        60
OIR    2025130    131400  -10.9400 -138.0000      26.7       352       146        60
OIR    2025130    131400  -10.9400 -138.0100      26.7       352       145        60
OIR    2025130    131400  -10.9400 -138.0200      26.7       352       144        60
OIR    2025130    131400  -10.9400 -138.0300      26.7       352       143        60
OIR    2025130    131400  -10.9400 -138.0400      26.7       352       141        60
OIR    2025130    131400  -10.9400 -138.0500      26.7       352       139        60
OIR    2025130    131400  -10.9400 -138.0600      26.7       352       138        60
OIR    2025130    131400  -10.9400 -138.0700      26.7       353       138        60
OIR    2025130    131400  -10.9400 -138.0800      26.7       353       138        60
OIR    2025130    131400  -10.9400 -138.0900      26.7       353       138        60
OIR    2025130    131400  -10.9400 -138.1000      26.7       353       138        60
OIR    2025130    131400  -10.9400 -138.1100      26.7       353       139        60
OIR    2025130    131400  -10.9400 -138.1200      26.7       354       140        60
OIR    2025130    131400  -10.9400 -138.1300      26.7       354       141        60
OIR    2025130    131400  -10.9400 -138.1400      26.7       354       141        60
OIR    2025130    131400  -10.9400 -138.1500      26.7       355       140        60
OIR    2025130    131400  -10.9400 -138.1600      26.7       356       140        60
OIR    2025130    131400  -10.9400 -138.1700      26.8       357       142        60
OIR    2025130    131400  -10.9400 -138.1800      26.8       357       144        60
OIR    2025130    131400  -10.9400 -138.1900      26.8       357       145        60
OIR    2025130    131400  -10.9400 -138.2000      26.8       358       147        60
OIR    2025130    131400  -10.9400 -138.2100      26.9       358       150        60
OIR    2025130    131400  -10.9500 -136.5900      44.9        21       148        60
OIR    2025130    131400  -10.9500 -136.6000      44.9        21       146        60
OIR    2025130    131400  -10.9500 -136.6100      45.0        21       144        60
OIR    2025130    131400  -10.9500 -136.6200      45.1        21       141        60
OIR    2025130    131400  -10.9500 -136.6300      45.1        21       139        60
OIR    2025130    131400  -10.9500 -136.6400      45.1        21       142        60
OIR    2025130    131400  -10.9500 -136.6500      45.1        21       144        60
OIR    2025130    131400  -10.9500 -136.6600      44.9        21       142        60
OIR    2025130    131400  -10.9500 -136.6700      44.4        21       138        60
OIR    2025130    131400  -10.9500 -136.6800      43.4        20       134        60
OIR    2025130    131400  -10.9500 -136.6900      42.1        19       133        60
OIR    2025130    131400  -10.9500 -136.7000      41.7        19       133        60
OIR    2025130    131400  -10.9500 -136.7100      41.5        19       133        60
OIR    2025130    131400  -10.9500 -136.7200      41.4        19       132        60
OIR    2025130    131400  -10.9500 -136.7300      41.3        19       129        60
OIR    2025130    131400  -10.9500 -136.7400      41.2        19       125        60
OIR    2025130    131400  -10.9500 -136.7500      41.1        19       126        60
OIR    2025130    131400  -10.9500 -136.7600      41.1        19       127        60
OIR    2025130    131400  -10.9500 -136.7700      41.0        19       130        60
OIR    2025130    131400  -10.9500 -136.7800      41.0        19       132        60
OIR    2025130    131400  -10.9500 -136.7900      41.0        19       132        60
OIR    2025130    131400  -10.9500 -136.8000      41.0        19       136        60
OIR    2025130    131400  -10.9500 -136.8100      41.0        19       142        60
OIR    2025130    131400  -10.9500 -136.8200      40.9        18       142        60
OIR    2025130    131400  -10.9500 -136.8300      40.9        18       139        60
OIR    2025130    131400  -10.9500 -136.8400      40.8        18       139        60
OIR    2025130    131400  -10.9500 -136.8500      40.8        18       138        60
OIR    2025130    131400  -10.9500 -136.8600      40.8        18       137        60
OIR    2025130    131400  -10.9500 -136.8700      40.7        18       135        60
OIR    2025130    131400  -10.9500 -136.8800      40.7        18       135        60
OIR    2025130    131400  -10.9500 -136.8900      40.7        18       136        60
OIR    2025130    131400  -10.9500 -136.9000      40.7        18       138        60
OIR    2025130    131400  -10.9500 -136.9100      40.6        18       139        60
OIR    2025130    131400  -10.9500 -136.9200      40.6        18       139        60
OIR    2025130    131400  -10.9500 -136.9300      40.6        18       139        60
OIR    2025130    131400  -10.9500 -136.9400      40.6        18       138        60
OIR    2025130    131400  -10.9500 -136.9500      40.6        18       138        60
OIR    2025130    131400  -10.9500 -136.9600      40.5        17       137        60
OIR    2025130    131400  -10.9500 -136.9700      40.2        16       135        60
OIR    2025130    131400  -10.9500 -136.9800      40.0        15       134        60
OIR    2025130    131400  -10.9500 -136.9900      39.9        15       133        60
OIR    2025130    131400  -10.9500 -137.0000      39.9        15       133        60
OIR    2025130    131400  -10.9500 -137.0100      39.9        14       137        60
OIR    2025130    131400  -10.9500 -137.0200      40.0        14       139        60
OIR    2025130    131400  -10.9500 -137.0300      39.9        14       139        60
OIR    2025130    131400  -10.9500 -137.0400      39.9        14       138        60
OIR    2025130    131400  -10.9500 -137.0500      39.9        14       135        60
OIR    2025130    131400  -10.9500 -137.0600      39.8        13       134        60
OIR    2025130    131400  -10.9500 -137.0700      39.9        13       132        60
OIR    2025130    131400  -10.9500 -137.0800      40.0        12       132        60
OIR    2025130    131400  -10.9500 -137.0900      40.3        11       132        60
OIR    2025130    131400  -10.9500 -137.1000      40.6        10       128        60
OIR    2025130    131400  -10.9500 -137.1100      40.8        10       124        60
OIR    2025130    131400  -10.9500 -137.1200      40.8         9       122        60
OIR    2025130    131400  -10.9500 -137.1300      40.8         9       121        60
OIR    2025130    131400  -10.9500 -137.1400      40.8         9       123        60
OIR    2025130    131400  -10.9500 -137.1500      40.8         9       124        60
OIR    2025130    131400  -10.9500 -137.1600      40.8         9       125        60
OIR    2025130    131400  -10.9500 -137.1700      40.8         9       126        60
OIR    2025130    131400  -10.9500 -137.1800      40.7         9       128        60
OIR    2025130    131400  -10.9500 -137.1900      40.7         9       125        60
OIR    2025130    131400  -10.9500 -137.2000      40.7         9       123        60
OIR    2025130    131400  -10.9500 -137.2100      40.7         9       122        60
OIR    2025130    131400  -10.9500 -137.2200      40.5         9       121        60
OIR    2025130    131400  -10.9500 -137.2300      40.5         8       122        60
OIR    2025130    131400  -10.9500 -137.2400      40.4         8       123        60
OIR    2025130    131400  -10.9500 -137.2500      40.4         8       123        60
OIR    2025130    131400  -10.9500 -137.2600      40.4         7       123        60
OIR    2025130    131400  -10.9500 -137.2700      40.4         7       122        60
OIR    2025130    131400  -10.9500 -137.2800      40.5         7       126        60
OIR    2025130    131400  -10.9500 -137.2900      40.5         6       130        60
OIR    2025130    131400  -10.9500 -137.3000      40.5         6       131        60
OIR    2025130    131400  -10.9500 -137.3100      40.5         5       132        60
OIR    2025130    131400  -10.9500 -137.3200      40.5         5       132        60
OIR    2025130    131400  -10.9500 -137.3300      40.4         5       131        60
OIR    2025130    131400  -10.9500 -137.3400      40.4         4       127        60
OIR    2025130    131400  -10.9500 -137.3500      40.4         4       124        60
OIR    2025130    131400  -10.9500 -137.3600      40.4         3       123        60
OIR    2025130    131400  -10.9500 -137.3700      40.4         2       123        60
OIR    2025130    131400  -10.9500 -137.3800      40.3         2       126        60
OIR    2025130    131400  -10.9500 -137.3900      40.3         1       126        60
OIR    2025130    131400  -10.9500 -137.4000      40.2         1       126        60
OIR    2025130    131400  -10.9500 -137.4100      40.2       360       126        60
OIR    2025130    131400  -10.9500 -137.4200      40.1       359       124        60
OIR    2025130    131400  -10.9500 -137.4300      40.1       358       121        60
OIR    2025130    131400  -10.9500 -137.4400      40.0       357       119        60
OIR    2025130    131400  -10.9500 -137.4500      39.9       357       121        60
OIR    2025130    131400  -10.9500 -137.4600      39.8       357       124        60
OIR    2025130    131400  -10.9500 -137.4700      39.7       356       125        60
OIR    2025130    131400  -10.9500 -137.4800      39.7       356       126        60
OIR    2025130    131400  -10.9500 -137.4900      39.7       356       126        60
OIR    2025130    131400  -10.9500 -137.5000      39.7       356       128        60
OIR    2025130    131400  -10.9500 -137.5100      39.7       356       132        60
OIR    2025130    131400  -10.9500 -137.5200      39.8       356       136        60
OIR    2025130    131400  -10.9500 -137.5300      39.7       356       140        60
OIR    2025130    131400  -10.9500 -137.5400      39.6       356       140        60
OIR    2025130    131400  -10.9500 -137.5500      38.4       355       139        60
OIR    2025130    131400  -10.9500 -137.5600      36.8       354       136        60
OIR    2025130    131400  -10.9500 -137.5700      36.5       354       134        60
OIR    2025130    131400  -10.9500 -137.5800      36.3       353       133        60
OIR    2025130    131400  -10.9500 -137.5900      36.2       353       132        60
OIR    2025130    131400  -10.9500 -137.6000      36.1       353       131        60
OIR    2025130    131400  -10.9500 -137.6100      36.0       353       132        60
OIR    2025130    131400  -10.9500 -137.6200      36.0       353       133        60
OIR    2025130    131400  -10.9500 -137.6300      35.9       353       135        60
OIR    2025130    131400  -10.9500 -137.6400      35.9       353       138        60
OIR    2025130    131400  -10.9500 -137.6500      35.7       352       138        60
OIR    2025130    131400  -10.9500 -137.6600      35.6       352       138        60
OIR    2025130    131400  -10.9500 -137.6700      35.4       352       135        60
OIR    2025130    131400  -10.9500 -137.6800      35.1       352       133        60
OIR    2025130    131400  -10.9500 -137.6900      34.7       352       132        60
OIR    2025130    131400  -10.9500 -137.7000      34.2       351       131        60
OIR    2025130    131400  -10.9500 -137.7100      33.7       351       131        60
OIR    2025130    131400  -10.9500 -137.7200      33.4       351       132        60
OIR    2025130    131400  -10.9500 -137.7300      33.1       351       132        60
OIR    2025130    131400  -10.9500 -137.7400      32.8       351       132        60
OIR    2025130    131400  -10.9500 -137.7500      32.4       351       132        60
OIR    2025130    131400  -10.9500 -137.7600      31.9       351       131        60
OIR    2025130    131400  -10.9500 -137.7700      31.4       351       131        60
OIR    2025130    131400  -10.9500 -137.7800      30.7       350       131        60
OIR    2025130    131400  -10.9500 -137.7900      29.4       351       132        60
OIR    2025130    131400  -10.9500 -137.8000      28.1       351       135        60
OIR    2025130    131400  -10.9500 -137.8100      27.4       351       137        60
OIR    2025130    131400  -10.9500 -137.8200      27.1       351       138        60
OIR    2025130    131400  -10.9500 -137.8300      26.9       351       139        60
OIR    2025130    131400  -10.9500 -137.8400      26.8       351       141        60
OIR    2025130    131400  -10.9500 -137.8500      26.7       351       141        60
OIR    2025130    131400  -10.9500 -137.8600      26.7       351       141        60
OIR    2025130    131400  -10.9500 -137.8700      26.6       352       141        60
OIR    2025130    131400  -10.9500 -137.8800      26.6       352       141        60
OIR    2025130    131400  -10.9500 -137.8900      26.6       352       142        60
OIR    2025130    131400  -10.9500 -137.9000      26.6       352       144        60
OIR    2025130    131400  -10.9500 -137.9100      26.6       352       148        60
OIR    2025130    131400  -10.9500 -137.9200      26.6       352       151        60
OIR    2025130    131400  -10.9500 -137.9300      26.6       352       150        60
OIR    2025130    131400  -10.9500 -137.9400      26.6       352       150        60
OIR    2025130    131400  -10.9500 -137.9500      26.7       352       151        60
OIR    2025130    131400  -10.9500 -137.9800      26.7       352       150        60
OIR    2025130    131400  -10.9500 -137.9900      26.7       352       149        60
OIR    2025130    131400  -10.9500 -138.0000      26.7       352       148        60
OIR    2025130    131400  -10.9500 -138.0100      26.7       352       147        60
OIR    2025130    131400  -10.9500 -138.0200      26.7       352       145        60
OIR    2025130    131400  -10.9500 -138.0300      26.7       352       143        60
OIR    2025130    131400  -10.9500 -138.0400      26.7       352       141        60
OIR    2025130    131400  -10.9500 -138.0500      26.7       352       139        60
OIR    2025130    131400  -10.9500 -138.0600      26.7       352       141        60
OIR    2025130    131400  -10.9500 -138.0700      26.7       352       141        60
OIR    2025130    131400  -10.9500 -138.0800      26.7       353       141        60
OIR    2025130    131400  -10.9500 -138.0900      26.7       353       141        60
OIR    2025130    131400  -10.9500 -138.1000      26.7       353       140        60
OIR    2025130    131400  -10.9500 -138.1100      26.7       353       141        60
OIR    2025130    131400  -10.9500 -138.1200      26.7       353       142        60
OIR    2025130    131400  -10.9500 -138.1300      26.7       354       140        60
OIR    2025130    131400  -10.9500 -138.1400      26.7       354       140        60
OIR    2025130    131400  -10.9500 -138.1500      26.7       355       140        60
OIR    2025130    131400  -10.9500 -138.1600      26.7       356       141        60
OIR    2025130    131400  -10.9500 -138.1700      26.7       356       144        60
OIR    2025130    131400  -10.9500 -138.1800      26.8       357       146        60
OIR    2025130    131400  -10.9500 -138.1900      26.8       357       148        60
OIR    2025130    131400  -10.9500 -138.2000      26.8       357       150        60
OIR    2025130    131400  -10.9600 -136.5800      44.7        22       150        60
OIR    2025130    131400  -10.9600 -136.5900      44.8        21       145        60
OIR    2025130    131400  -10.9600 -136.6000      44.8        21       144        60
OIR    2025130    131400  -10.9600 -136.6100      44.8        21       143        60
OIR    2025130    131400  -10.9600 -136.6200      44.9        21       140        60
OIR    2025130    131400  -10.9600 -136.6300      45.0        21       138        60
OIR    2025130    131400  -10.9600 -136.6400      45.0        21       141        60
OIR    2025130    131400  -10.9600 -136.6500      44.9        21       143        60
OIR    2025130    131400  -10.9600 -136.6600      44.6        21       142        60
OIR    2025130    131400  -10.9600 -136.6700      43.9        21       140        60
OIR    2025130    131400  -10.9600 -136.6800      42.6        20       137        60
OIR    2025130    131400  -10.9600 -136.6900      41.7        19       135        60
OIR    2025130    131400  -10.9600 -136.7000      41.4        19       135        60
OIR    2025130    131400  -10.9600 -136.7100      41.3        19       134        60
OIR    2025130    131400  -10.9600 -136.7200      41.2        19       132        60
OIR    2025130    131400  -10.9600 -136.7300      41.2        19       130        60
OIR    2025130    131400  -10.9600 -136.7400      41.1        19       127        60
OIR    2025130    131400  -10.9600 -136.7500      41.1        19       128        60
OIR    2025130    131400  -10.9600 -136.7600      41.0        19       130        60
OIR    2025130    131400  -10.9600 -136.7700      41.0        19       131        60
OIR    2025130    131400  -10.9600 -136.7800      41.0        19       132        60
OIR    2025130    131400  -10.9600 -136.7900      40.9        19       133        60
OIR    2025130    131400  -10.9600 -136.8000      40.9        19       136        60
OIR    2025130    131400  -10.9600 -136.8100      40.9        18       141        60
OIR    2025130    131400  -10.9600 -136.8200      40.9        18       141        60
OIR    2025130    131400  -10.9600 -136.8300      40.8        18       139        60
OIR    2025130    131400  -10.9600 -136.8400      40.8        18       139        60
OIR    2025130    131400  -10.9600 -136.8500      40.7        18       139        60
OIR    2025130    131400  -10.9600 -136.8600      40.7        18       137        60
OIR    2025130    131400  -10.9600 -136.8700      40.7        18       137        60
OIR    2025130    131400  -10.9600 -136.8800      40.7        18       137        60
OIR    2025130    131400  -10.9600 -136.8900      40.7        18       137        60
OIR    2025130    131400  -10.9600 -136.9000      40.7        18       138        60
OIR    2025130    131400  -10.9600 -136.9100      40.6        18       139        60
OIR    2025130    131400  -10.9600 -136.9200      40.6        18       140        60
OIR    2025130    131400  -10.9600 -136.9300      40.6        18       139        60
OIR    2025130    131400  -10.9600 -136.9400      40.6        18       138        60
OIR    2025130    131400  -10.9600 -136.9500      40.5        17       139        60
OIR    2025130    131400  -10.9600 -136.9600      40.3        17       139        60
OIR    2025130    131400  -10.9600 -136.9700      40.0        16       138        60
OIR    2025130    131400  -10.9600 -136.9800      39.9        15       136        60
OIR    2025130    131400  -10.9600 -136.9900      39.8        15       136        60
OIR    2025130    131400  -10.9600 -137.0000      39.8        15       135        60
OIR    2025130    131400  -10.9600 -137.0100      39.8        14       138        60
OIR    2025130    131400  -10.9600 -137.0200      39.8        14       139        60
OIR    2025130    131400  -10.9600 -137.0300      39.8        14       140        60
OIR    2025130    131400  -10.9600 -137.0400      39.8        14       139        60
OIR    2025130    131400  -10.9600 -137.0500      39.8        13       137        60
OIR    2025130    131400  -10.9600 -137.0600      39.7        13       135        60
OIR    2025130    131400  -10.9600 -137.0700      39.8        12       133        60
OIR    2025130    131400  -10.9600 -137.0800      39.9        12       133        60
OIR    2025130    131400  -10.9600 -137.0900      40.1        11       132        60
OIR    2025130    131400  -10.9600 -137.1000      40.4        10       130        60
OIR    2025130    131400  -10.9600 -137.1100      40.6        10       127        60
OIR    2025130    131400  -10.9600 -137.1200      40.7        10       126        60
OIR    2025130    131400  -10.9600 -137.1300      40.8         9       126        60
OIR    2025130    131400  -10.9600 -137.1400      40.8         9       126        60
OIR    2025130    131400  -10.9600 -137.1500      40.8         9       126        60
OIR    2025130    131400  -10.9600 -137.1600      40.7         9       126        60
OIR    2025130    131400  -10.9600 -137.1700      40.7         9       127        60
OIR    2025130    131400  -10.9600 -137.1800      40.6         9       129        60
OIR    2025130    131400  -10.9600 -137.1900      40.6         9       127        60
OIR    2025130    131400  -10.9600 -137.2000      40.5         9       126        60
OIR    2025130    131400  -10.9600 -137.2100      40.5         9       125        60
OIR    2025130    131400  -10.9600 -137.2200      40.4         9       125        60
OIR    2025130    131400  -10.9600 -137.2300      40.4         8       125        60
OIR    2025130    131400  -10.9600 -137.2400      40.3         8       125        60
OIR    2025130    131400  -10.9600 -137.2500      40.3         8       125        60
OIR    2025130    131400  -10.9600 -137.2600      40.3         7       125        60
OIR    2025130    131400  -10.9600 -137.2700      40.3         7       125        60
OIR    2025130    131400  -10.9600 -137.2800      40.3         7       128        60
OIR    2025130    131400  -10.9600 -137.2900      40.4         6       132        60
OIR    2025130    131400  -10.9600 -137.3000      40.5         6       133        60
OIR    2025130    131400  -10.9600 -137.3100      40.4         5       134        60
OIR    2025130    131400  -10.9600 -137.3200      40.4         5       134        60
OIR    2025130    131400  -10.9600 -137.3300      40.3         4       134        60
OIR    2025130    131400  -10.9600 -137.3400      40.2         4       131        60
OIR    2025130    131400  -10.9600 -137.3500      40.2         3       129        60
OIR    2025130    131400  -10.9600 -137.3600      40.2         2       128        60
OIR    2025130    131400  -10.9600 -137.3700      40.2         2       128        60
OIR    2025130    131400  -10.9600 -137.3800      40.1         1       131        60
OIR    2025130    131400  -10.9600 -137.3900      40.0         1       131        60
OIR    2025130    131400  -10.9600 -137.4000      40.0         0       129        60
OIR    2025130    131400  -10.9600 -137.4100      40.0       360       128        60
OIR    2025130    131400  -10.9600 -137.4200      39.9       359       127        60
OIR    2025130    131400  -10.9600 -137.4300      40.0       358       125        60
OIR    2025130    131400  -10.9600 -137.4400      39.9       357       124        60
OIR    2025130    131400  -10.9600 -137.4500      39.9       357       127        60
OIR    2025130    131400  -10.9600 -137.4600      39.8       356       129        60
OIR    2025130    131400  -10.9600 -137.4700      39.8       356       130        60
OIR    2025130    131400  -10.9600 -137.4800      39.7       356       130        60
OIR    2025130    131400  -10.9600 -137.4900      39.8       356       129        60
OIR    2025130    131400  -10.9600 -137.5000      39.8       356       130        60
OIR    2025130    131400  -10.9600 -137.5100      39.8       356       133        60
OIR    2025130    131400  -10.9600 -137.5200      39.8       356       135        60
OIR    2025130    131400  -10.9600 -137.5300      39.8       356       138        60
OIR    2025130    131400  -10.9600 -137.5400      39.7       356       139        60
OIR    2025130    131400  -10.9600 -137.5500      38.9       355       139        60
OIR    2025130    131400  -10.9600 -137.5600      37.1       354       138        60
OIR    2025130    131400  -10.9600 -137.5700      36.5       354       137        60
OIR    2025130    131400  -10.9600 -137.5800      36.1       353       136        60
OIR    2025130    131400  -10.9600 -137.5900      35.8       353       135        60
OIR    2025130    131400  -10.9600 -137.6000      35.7       353       135        60
OIR    2025130    131400  -10.9600 -137.6100      35.7       353       135        60
OIR    2025130    131400  -10.9600 -137.6200      35.8       353       135        60
OIR    2025130    131400  -10.9600 -137.6300      35.8       353       136        60
OIR    2025130    131400  -10.9600 -137.6400      35.7       352       136        60
OIR    2025130    131400  -10.9600 -137.6500      35.6       352       136        60
OIR    2025130    131400  -10.9600 -137.6600      35.4       352       135        60
OIR    2025130    131400  -10.9600 -137.6700      35.1       352       133        60
OIR    2025130    131400  -10.9600 -137.6800      34.6       352       132        60
OIR    2025130    131400  -10.9600 -137.6900      34.3       351       131        60
OIR    2025130    131400  -10.9600 -137.7000      33.9       351       131        60
OIR    2025130    131400  -10.9600 -137.7100      33.5       351       131        60
OIR    2025130    131400  -10.9600 -137.7200      33.2       351       131        60
OIR    2025130    131400  -10.9600 -137.7300      32.9       351       132        60
OIR    2025130    131400  -10.9600 -137.7400      32.5       351       132        60
OIR    2025130    131400  -10.9600 -137.7500      32.0       351       132        60
OIR    2025130    131400  -10.9600 -137.7600      31.5       351       132        60
OIR    2025130    131400  -10.9600 -137.7700      31.0       350       131        60
OIR    2025130    131400  -10.9600 -137.7800      30.3       350       132        60
OIR    2025130    131400  -10.9600 -137.7900      28.9       351       133        60
OIR    2025130    131400  -10.9600 -137.8000      27.7       351       135        60
OIR    2025130    131400  -10.9600 -137.8100      27.2       351       136        60
OIR    2025130    131400  -10.9600 -137.8200      27.0       351       137        60
OIR    2025130    131400  -10.9600 -137.8300      26.9       351       139        60
OIR    2025130    131400  -10.9600 -137.8400      26.8       351       141        60
OIR    2025130    131400  -10.9600 -137.8500      26.7       351       143        60
OIR    2025130    131400  -10.9600 -137.8600      26.6       351       144        60
OIR    2025130    131400  -10.9600 -137.8700      26.6       351       145        60
OIR    2025130    131400  -10.9600 -137.8800      26.5       352       147        60
OIR    2025130    131400  -10.9600 -137.8900      26.5       352       147        60
OIR    2025130    131400  -10.9600 -137.9000      26.5       352       148        60
OIR    2025130    131400  -10.9600 -137.9100      26.5       352       151        60
OIR    2025130    131400  -10.9600 -137.9300      26.6       352       150        60
OIR    2025130    131400  -10.9600 -137.9400      26.6       352       149        60
OIR    2025130    131400  -10.9600 -137.9500      26.7       352       150        60
OIR    2025130    131400  -10.9600 -137.9600      26.7       352       149        60
OIR    2025130    131400  -10.9600 -137.9700      26.8       352       148        60
OIR    2025130    131400  -10.9600 -137.9800      26.9       352       147        60
OIR    2025130    131400  -10.9600 -137.9900      26.9       352       146        60
OIR    2025130    131400  -10.9600 -138.0000      26.8       352       147        60
OIR    2025130    131400  -10.9600 -138.0100      26.7       352       147        60
OIR    2025130    131400  -10.9600 -138.0200      26.7       352       146        60
OIR    2025130    131400  -10.9600 -138.0300      26.7       352       145        60
OIR    2025130    131400  -10.9600 -138.0400      26.7       352       143        60
OIR    2025130    131400  -10.9600 -138.0500      26.7       352       142        60
OIR    2025130    131400  -10.9600 -138.0600      26.7       352       144        60
OIR    2025130    131400  -10.9600 -138.0700      26.7       352       144        60
OIR    2025130    131400  -10.9600 -138.0800      26.7       353       143        60
OIR    2025130    131400  -10.9600 -138.0900      26.7       353       144        60
OIR    2025130    131400  -10.9600 -138.1000      26.7       353       144        60
OIR    2025130    131400  -10.9600 -138.1100      26.7       353       144        60
OIR    2025130    131400  -10.9600 -138.1200      26.7       353       144        60
OIR    2025130    131400  -10.9600 -138.1300      26.7       353       144        60
OIR    2025130    131400  -10.9600 -138.1400      26.7       354       144        60
OIR    2025130    131400  -10.9600 -138.1500      26.7       354       145        60
OIR    2025130    131400  -10.9600 -138.1600      26.6       355       146        60
OIR    2025130    131400  -10.9600 -138.1700      26.7       356       147        60
OIR    2025130    131400  -10.9600 -138.1800      26.7       356       149        60
OIR    2025130    131400  -10.9600 -138.1900      26.8       357       151        60
OIR    2025130    131400  -10.9700 -136.5800      44.3        21       148        60
OIR    2025130    131400  -10.9700 -136.5900      44.4        21       142        60
OIR    2025130    131400  -10.9700 -136.6000      44.5        21       141        60
OIR    2025130    131400  -10.9700 -136.6100      44.6        21       141        60
OIR    2025130    131400  -10.9700 -136.6200      44.7        21       139        60
OIR    2025130    131400  -10.9700 -136.6300      44.8        21       137        60
OIR    2025130    131400  -10.9700 -136.6400      44.7        21       138        60
OIR    2025130    131400  -10.9700 -136.6500      44.5        21       140        60
OIR    2025130    131400  -10.9700 -136.6600      44.1        21       140        60
OIR    2025130    131400  -10.9700 -136.6700      43.2        20       140        60
OIR    2025130    131400  -10.9700 -136.6800      42.1        19       139        60
OIR    2025130    131400  -10.9700 -136.6900      41.4        19       138        60
OIR    2025130    131400  -10.9700 -136.7000      41.2        19       137        60
OIR    2025130    131400  -10.9700 -136.7100      41.1        19       134        60
OIR    2025130    131400  -10.9700 -136.7200      41.1        19       132        60
OIR    2025130    131400  -10.9700 -136.7300      41.0        19       130        60
OIR    2025130    131400  -10.9700 -136.7400      41.0        19       129        60
OIR    2025130    131400  -10.9700 -136.7500      41.0        19       130        60
OIR    2025130    131400  -10.9700 -136.7600      40.9        19       131        60
OIR    2025130    131400  -10.9700 -136.7700      40.9        19       131        60
OIR    2025130    131400  -10.9700 -136.7800      40.9        19       131        60
OIR    2025130    131400  -10.9700 -136.7900      40.9        19       134        60
OIR    2025130    131400  -10.9700 -136.8000      40.8        19       137        60
OIR    2025130    131400  -10.9700 -136.8100      40.8        18       139        60
OIR    2025130    131400  -10.9700 -136.8200      40.8        18       139        60
OIR    2025130    131400  -10.9700 -136.8300      40.8        18       139        60
OIR    2025130    131400  -10.9700 -136.8400      40.7        18       139        60
OIR    2025130    131400  -10.9700 -136.8500      40.7        18       139        60
OIR    2025130    131400  -10.9700 -136.8600      40.7        18       138        60
OIR    2025130    131400  -10.9700 -136.8700      40.7        18       137        60
OIR    2025130    131400  -10.9700 -136.8800      40.7        18       138        60
OIR    2025130    131400  -10.9700 -136.8900      40.6        18       138        60
OIR    2025130    131400  -10.9700 -136.9000      40.6        18       137        60
OIR    2025130    131400  -10.9700 -136.9100      40.6        18       137        60
OIR    2025130    131400  -10.9700 -136.9200      40.6        18       140        60
OIR    2025130    131400  -10.9700 -136.9300      40.6        18       140        60
OIR    2025130    131400  -10.9700 -136.9400      40.5        18       139        60
OIR    2025130    131400  -10.9700 -136.9500      40.4        17       140        60
OIR    2025130    131400  -10.9700 -136.9600      40.1        17       140        60
OIR    2025130    131400  -10.9700 -136.9700      39.9        16       140        60
OIR    2025130    131400  -10.9700 -136.9800      39.8        15       139        60
OIR    2025130    131400  -10.9700 -136.9900      39.8        15       138        60
OIR    2025130    131400  -10.9700 -137.0000      39.7        15       137        60
OIR    2025130    131400  -10.9700 -137.0100      39.7        14       138        60
OIR    2025130    131400  -10.9700 -137.0200      39.7        14       139        60
OIR    2025130    131400  -10.9700 -137.0300      39.7        14       140        60
OIR    2025130    131400  -10.9700 -137.0400      39.7        13       139        60
OIR    2025130    131400  -10.9700 -137.0500      39.6        13       138        60
OIR    2025130    131400  -10.9700 -137.0600      39.6        13       136        60
OIR    2025130    131400  -10.9700 -137.0700      39.6        12       133        60
OIR    2025130    131400  -10.9700 -137.0800      39.7        12       133        60
OIR    2025130    131400  -10.9700 -137.0900      40.0        11       132        60
OIR    2025130    131400  -10.9700 -137.1000      40.2        10       132        60
OIR    2025130    131400  -10.9700 -137.1100      40.5        10       131        60
OIR    2025130    131400  -10.9700 -137.1200      40.6        10       130        60
OIR    2025130    131400  -10.9700 -137.1300      40.7        10       130        60
OIR    2025130    131400  -10.9700 -137.1400      40.7         9       129        60
OIR    2025130    131400  -10.9700 -137.1500      40.7         9       129        60
OIR    2025130    131400  -10.9700 -137.1600      40.7         9       127        60
OIR    2025130    131400  -10.9700 -137.1700      40.6         9       128        60
OIR    2025130    131400  -10.9700 -137.1800      40.5         9       129        60
OIR    2025130    131400  -10.9700 -137.1900      40.5         9       129        60
OIR    2025130    131400  -10.9700 -137.2000      40.4         9       130        60
OIR    2025130    131400  -10.9700 -137.2100      40.3         9       129        60
OIR    2025130    131400  -10.9700 -137.2200      40.3         9       129        60
OIR    2025130    131400  -10.9700 -137.2300      40.2         8       129        60
OIR    2025130    131400  -10.9700 -137.2400      40.2         8       128        60
OIR    2025130    131400  -10.9700 -137.2500      40.1         7       128        60
OIR    2025130    131400  -10.9700 -137.2600      40.1         7       128        60
OIR    2025130    131400  -10.9700 -137.2700      40.2         7       128        60
OIR    2025130    131400  -10.9700 -137.2800      40.2         7       131        60
OIR    2025130    131400  -10.9700 -137.2900      40.3         6       134        60
OIR    2025130    131400  -10.9700 -137.3000      40.4         6       135        60
OIR    2025130    131400  -10.9700 -137.3100      40.4         5       136        60
OIR    2025130    131400  -10.9700 -137.3200      40.3         5       136        60
OIR    2025130    131400  -10.9700 -137.3300      40.2         4       136        60
OIR    2025130    131400  -10.9700 -137.3400      40.2         3       135        60
OIR    2025130    131400  -10.9700 -137.3500      40.2         3       135        60
OIR    2025130    131400  -10.9700 -137.3600      40.1         2       133        60
OIR    2025130    131400  -10.9700 -137.3700      40.0         2       133        60
OIR    2025130    131400  -10.9700 -137.3800      39.9         1       136        60
OIR    2025130    131400  -10.9700 -137.3900      39.9         1       134        60
OIR    2025130    131400  -10.9700 -137.4000      39.9         0       132        60
OIR    2025130    131400  -10.9700 -137.4100      39.7       359       131        60
OIR    2025130    131400  -10.9700 -137.4200      39.8       359       130        60
OIR    2025130    131400  -10.9700 -137.4300      39.9       358       130        60
OIR    2025130    131400  -10.9700 -137.4400      39.9       357       130        60
OIR    2025130    131400  -10.9700 -137.4500      39.9       357       133        60
OIR    2025130    131400  -10.9700 -137.4600      39.8       356       135        60
OIR    2025130    131400  -10.9700 -137.4700      39.8       356       135        60
OIR    2025130    131400  -10.9700 -137.4800      39.8       356       134        60
OIR    2025130    131400  -10.9700 -137.4900      39.8       356       132        60
OIR    2025130    131400  -10.9700 -137.5000      39.8       356       132        60
OIR    2025130    131400  -10.9700 -137.5100      39.8       356       133        60
OIR    2025130    131400  -10.9700 -137.5200      39.8       356       134        60
OIR    2025130    131400  -10.9700 -137.5300      39.8       356       136        60
OIR    2025130    131400  -10.9700 -137.5400      39.7       356       137        60
OIR    2025130    131400  -10.9700 -137.5500      38.7       355       138        60
OIR    2025130    131400  -10.9700 -137.5600      36.7       354       139        60
OIR    2025130    131400  -10.9700 -137.5700      35.6       353       139        60
OIR    2025130    131400  -10.9700 -137.5800      35.0       353       139        60
OIR    2025130    131400  -10.9700 -137.5900      34.7       353       139        60
OIR    2025130    131400  -10.9700 -137.6000      34.5       353       138        60
OIR    2025130    131400  -10.9700 -137.6100      34.5       353       138        60
OIR    2025130    131400  -10.9700 -137.6200      34.5       353       137        60
OIR    2025130    131400  -10.9700 -137.6300      34.5       353       136        60
OIR    2025130    131400  -10.9700 -137.6400      34.7       352       134        60
OIR    2025130    131400  -10.9700 -137.6500      34.7       352       133        60
OIR    2025130    131400  -10.9700 -137.6600      34.6       352       132        60
OIR    2025130    131400  -10.9700 -137.6700      34.5       352       131        60
OIR    2025130    131400  -10.9700 -137.6800      34.3       351       130        60
OIR    2025130    131400  -10.9700 -137.6900      34.0       351       130        60
OIR    2025130    131400  -10.9700 -137.7000      33.7       351       130        60
OIR    2025130    131400  -10.9700 -137.7100      33.4       351       130        60
OIR    2025130    131400  -10.9700 -137.7200      33.1       351       131        60
OIR    2025130    131400  -10.9700 -137.7300      32.6       351       132        60
OIR    2025130    131400  -10.9700 -137.7400      32.1       351       132        60
OIR    2025130    131400  -10.9700 -137.7500      31.6       350       133        60
OIR    2025130    131400  -10.9700 -137.7600      31.1       350       133        60
OIR    2025130    131400  -10.9700 -137.7700      30.6       350       132        60
OIR    2025130    131400  -10.9700 -137.7800      30.0       350       133        60
OIR    2025130    131400  -10.9700 -137.7900      28.8       351       134        60
OIR    2025130    131400  -10.9700 -137.8000      27.7       351       135        60
OIR    2025130    131400  -10.9700 -137.8100      27.2       351       136        60
OIR    2025130    131400  -10.9700 -137.8200      27.0       351       136        60
OIR    2025130    131400  -10.9700 -137.8300      26.8       351       138        60
OIR    2025130    131400  -10.9700 -137.8400      26.7       351       141        60
OIR    2025130    131400  -10.9700 -137.8500      26.6       351       144        60
OIR    2025130    131400  -10.9700 -137.8600      26.6       351       147        60
OIR    2025130    131400  -10.9700 -137.8700      26.5       351       150        60
OIR    2025130    131400  -10.9700 -137.9300      26.6       352       150        60
OIR    2025130    131400  -10.9700 -137.9400      26.7       352       149        60
OIR    2025130    131400  -10.9700 -137.9500      26.8       352       148        60
OIR    2025130    131400  -10.9700 -137.9600      26.8       352       146        60
OIR    2025130    131400  -10.9700 -137.9700      26.9       352       143        60
OIR    2025130    131400  -10.9700 -137.9800      27.0       352       143        60
OIR    2025130    131400  -10.9700 -137.9900      27.0       352       143        60
OIR    2025130    131400  -10.9700 -138.0000      27.0       352       144        60
OIR    2025130    131400  -10.9700 -138.0100      26.9       351       146        60
OIR    2025130    131400  -10.9700 -138.0200      26.8       352       147        60
OIR    2025130    131400  -10.9700 -138.0300      26.8       352       147        60
OIR    2025130    131400  -10.9700 -138.0400      26.7       352       146        60
OIR    2025130    131400  -10.9700 -138.0500      26.7       352       145        60
OIR    2025130    131400  -10.9700 -138.0600      26.7       352       146        60
OIR    2025130    131400  -10.9700 -138.0700      26.7       352       146        60
OIR    2025130    131400  -10.9700 -138.0800      26.7       352       145        60
OIR    2025130    131400  -10.9700 -138.0900      26.7       353       146        60
OIR    2025130    131400  -10.9700 -138.1000      26.7       353       146        60
OIR    2025130    131400  -10.9700 -138.1100      26.7       353       146        60
OIR    2025130    131400  -10.9700 -138.1200      26.7       353       146        60
OIR    2025130    131400  -10.9700 -138.1300      26.7       353       147        60
OIR    2025130    131400  -10.9700 -138.1400      26.7       354       148        60
OIR    2025130    131400  -10.9700 -138.1500      26.6       354       148        60
OIR    2025130    131400  -10.9700 -138.1600      26.6       355       149        60
OIR    2025130    131400  -10.9700 -138.1700      26.6       355       149        60
OIR    2025130    131400  -10.9700 -138.1800      26.7       356       150        60
OIR    2025130    131400  -10.9800 -136.5900      44.3        21       145        60
OIR    2025130    131400  -10.9800 -136.6000      44.3        21       145        60
OIR    2025130    131400  -10.9800 -136.6100      44.4        21       145        60
OIR    2025130    131400  -10.9800 -136.6200      44.6        21       141        60
OIR    2025130    131400  -10.9800 -136.6300      44.5        21       138        60
OIR    2025130    131400  -10.9800 -136.6400      44.3        21       138        60
OIR    2025130    131400  -10.9800 -136.6500      43.8        20       139        60
OIR    2025130    131400  -10.9800 -136.6600      43.1        20       139        60
OIR    2025130    131400  -10.9800 -136.6700      42.2        20       139        60
OIR    2025130    131400  -10.9800 -136.6800      41.5        19       139        60
OIR    2025130    131400  -10.9800 -136.6900      41.1        19       139        60
OIR    2025130    131400  -10.9800 -136.7000      41.0        19       137        60
OIR    2025130    131400  -10.9800 -136.7100      41.0        19       133        60
OIR    2025130    131400  -10.9800 -136.7200      41.0        19       130        60
OIR    2025130    131400  -10.9800 -136.7300      40.9        19       130        60
OIR    2025130    131400  -10.9800 -136.7400      40.9        19       130        60
OIR    2025130    131400  -10.9800 -136.7500      40.9        19       131        60
OIR    2025130    131400  -10.9800 -136.7600      40.9        19       132        60
OIR    2025130    131400  -10.9800 -136.7700      40.9        19       132        60
OIR    2025130    131400  -10.9800 -136.7800      40.8        19       133        60
OIR    2025130    131400  -10.9800 -136.7900      40.8        19       135        60
OIR    2025130    131400  -10.9800 -136.8000      40.8        19       136        60
OIR    2025130    131400  -10.9800 -136.8100      40.7        18       137        60
OIR    2025130    131400  -10.9800 -136.8200      40.7        18       138        60
OIR    2025130    131400  -10.9800 -136.8300      40.7        18       139        60
OIR    2025130    131400  -10.9800 -136.8400      40.7        18       140        60
OIR    2025130    131400  -10.9800 -136.8500      40.7        18       141        60
OIR    2025130    131400  -10.9800 -136.8600      40.7        18       140        60
OIR    2025130    131400  -10.9800 -136.8700      40.6        18       139        60
OIR    2025130    131400  -10.9800 -136.8800      40.6        18       139        60
OIR    2025130    131400  -10.9800 -136.8900      40.6        18       139        60
OIR    2025130    131400  -10.9800 -136.9000      40.6        18       138        60
OIR    2025130    131400  -10.9800 -136.9100      40.6        18       138        60
OIR    2025130    131400  -10.9800 -136.9200      40.6        18       140        60
OIR    2025130    131400  -10.9800 -136.9300      40.5        18       139        60
OIR    2025130    131400  -10.9800 -136.9400      40.5        18       139        60
OIR    2025130    131400  -10.9800 -136.9500      40.3        17       139        60
OIR    2025130    131400  -10.9800 -136.9600      40.1        17       141        60
OIR    2025130    131400  -10.9800 -136.9700      39.9        16       140        60
OIR    2025130    131400  -10.9800 -136.9800      39.8        15       140        60
OIR    2025130    131400  -10.9800 -136.9900      39.7        15       139        60
OIR    2025130    131400  -10.9800 -137.0000      39.7        15       138        60
OIR    2025130    131400  -10.9800 -137.0100      39.6        14       138        60
OIR    2025130    131400  -10.9800 -137.0200      39.6        14       139        60
OIR    2025130    131400  -10.9800 -137.0300      39.6        14       139        60
OIR    2025130    131400  -10.9800 -137.0400      39.5        13       138        60
OIR    2025130    131400  -10.9800 -137.0500      39.5        13       137        60
OIR    2025130    131400  -10.9800 -137.0600      39.5        13       137        60
OIR    2025130    131400  -10.9800 -137.0700      39.5        12       136        60
OIR    2025130    131400  -10.9800 -137.0800      39.6        12       134        60
OIR    2025130    131400  -10.9800 -137.0900      39.7        11       132        60
OIR    2025130    131400  -10.9800 -137.1000      40.0        10       129        60
OIR    2025130    131400  -10.9800 -137.1100      40.2        10       128        60
OIR    2025130    131400  -10.9800 -137.1200      40.5        10       129        60
OIR    2025130    131400  -10.9800 -137.1300      40.6        10       129        60
OIR    2025130    131400  -10.9800 -137.1400      40.6        10       129        60
OIR    2025130    131400  -10.9800 -137.1500      40.6         9       128        60
OIR    2025130    131400  -10.9800 -137.1600      40.6         9       125        60
OIR    2025130    131400  -10.9800 -137.1700      40.5         9       124        60
OIR    2025130    131400  -10.9800 -137.1800      40.4         9       123        60
OIR    2025130    131400  -10.9800 -137.1900      40.4         9       126        60
OIR    2025130    131400  -10.9800 -137.2000      40.3         9       129        60
OIR    2025130    131400  -10.9800 -137.2100      40.2         9       130        60
OIR    2025130    131400  -10.9800 -137.2200      40.2         9       130        60
OIR    2025130    131400  -10.9800 -137.2300      40.0         8       129        60
OIR    2025130    131400  -10.9800 -137.2400      40.0         8       129        60
OIR    2025130    131400  -10.9800 -137.2500      39.9         7       130        60
OIR    2025130    131400  -10.9800 -137.2600      40.0         7       130        60
OIR    2025130    131400  -10.9800 -137.2700      40.0         7       129        60
OIR    2025130    131400  -10.9800 -137.2800      40.1         6       130        60
OIR    2025130    131400  -10.9800 -137.2900      40.3         6       132        60
OIR    2025130    131400  -10.9800 -137.3000      40.3         6       133        60
OIR    2025130    131400  -10.9800 -137.3100      40.4         5       133        60
OIR    2025130    131400  -10.9800 -137.3200      40.3         5       133        60
OIR    2025130    131400  -10.9800 -137.3300      40.3         4       133        60
OIR    2025130    131400  -10.9800 -137.3400      40.2         3       133        60
OIR    2025130    131400  -10.9800 -137.3500      40.1         3       133        60
OIR    2025130    131400  -10.9800 -137.3600      40.0         2       134        60
OIR    2025130    131400  -10.9800 -137.3700      39.8         2       135        60
OIR    2025130    131400  -10.9800 -137.3800      39.6         1       137        60
OIR    2025130    131400  -10.9800 -137.3900      39.5         1       135        60
OIR    2025130    131400  -10.9800 -137.4000      39.5       360       132        60
OIR    2025130    131400  -10.9800 -137.4100      39.5       359       131        60
OIR    2025130    131400  -10.9800 -137.4200      39.5       359       131        60
OIR    2025130    131400  -10.9800 -137.4300      39.6       358       132        60
OIR    2025130    131400  -10.9800 -137.4400      39.7       357       132        60
OIR    2025130    131400  -10.9800 -137.4500      39.9       357       133        60
OIR    2025130    131400  -10.9800 -137.4600      39.9       356       133        60
OIR    2025130    131400  -10.9800 -137.4700      39.9       356       132        60
OIR    2025130    131400  -10.9800 -137.4800      39.8       356       131        60
OIR    2025130    131400  -10.9800 -137.4900      39.8       356       129        60
OIR    2025130    131400  -10.9800 -137.5000      39.8       356       129        60
OIR    2025130    131400  -10.9800 -137.5100      39.8       356       129        60
OIR    2025130    131400  -10.9800 -137.5200      39.8       356       130        60
OIR    2025130    131400  -10.9800 -137.5300      39.7       356       132        60
OIR    2025130    131400  -10.9800 -137.5400      39.5       356       133        60
OIR    2025130    131400  -10.9800 -137.5500      38.4       355       134        60
OIR    2025130    131400  -10.9800 -137.5600      36.4       354       133        60
OIR    2025130    131400  -10.9800 -137.5700      35.3       353       133        60
OIR    2025130    131400  -10.9800 -137.5800      34.8       353       134        60
OIR    2025130    131400  -10.9800 -137.5900      34.6       353       135        60
OIR    2025130    131400  -10.9800 -137.6000      34.5       353       135        60
OIR    2025130    131400  -10.9800 -137.6100      34.4       353       135        60
OIR    2025130    131400  -10.9800 -137.6200      34.4       353       134        60
OIR    2025130    131400  -10.9800 -137.6300      34.4       353       131        60
OIR    2025130    131400  -10.9800 -137.6400      34.4       352       128        60
OIR    2025130    131400  -10.9800 -137.6500      34.5       352       127        60
OIR    2025130    131400  -10.9800 -137.6600      34.4       352       126        60
OIR    2025130    131400  -10.9800 -137.6700      34.3       352       126        60
OIR    2025130    131400  -10.9800 -137.6800      34.2       351       126        60
OIR    2025130    131400  -10.9800 -137.6900      33.9       351       127        60
OIR    2025130    131400  -10.9800 -137.7000      33.6       351       127        60
OIR    2025130    131400  -10.9800 -137.7100      33.4       351       126        60
OIR    2025130    131400  -10.9800 -137.7200      33.0       351       127        60
OIR    2025130    131400  -10.9800 -137.7300      32.4       351       128        60
OIR    2025130    131400  -10.9800 -137.7400      31.8       350       129        60
OIR    2025130    131400  -10.9800 -137.7500      31.3       350       132        60
OIR    2025130    131400  -10.9800 -137.7600      30.8       350       132        60
OIR    2025130    131400  -10.9800 -137.7700      30.4       350       131        60
OIR    2025130    131400  -10.9800 -137.7800      29.9       350       131        60
OIR    2025130    131400  -10.9800 -137.7900      28.9       350       130        60
OIR    2025130    131400  -10.9800 -137.8000      27.9       351       131        60
OIR    2025130    131400  -10.9800 -137.8100      27.4       351       133        60
OIR    2025130    131400  -10.9800 -137.8200      27.1       351       136        60
OIR    2025130    131400  -10.9800 -137.8300      26.8       351       138        60
OIR    2025130    131400  -10.9800 -137.8400      26.7       351       141        60
OIR    2025130    131400  -10.9800 -137.8500      26.6       351       142        60
OIR    2025130    131400  -10.9800 -137.8600      26.6       351       143        60
OIR    2025130    131400  -10.9800 -137.8700      26.5       351       144        60
OIR    2025130    131400  -10.9800 -137.8800      26.5       351       145        60
OIR    2025130    131400  -10.9800 -137.8900      26.5       351       146        60
OIR    2025130    131400  -10.9800 -137.9000      26.5       352       147        60
OIR    2025130    131400  -10.9800 -137.9100      26.6       352       148        60
OIR    2025130    131400  -10.9800 -137.9200      26.6       352       148        60
OIR    2025130    131400  -10.9800 -137.9300      26.8       352       146        60
OIR    2025130    131400  -10.9800 -137.9400      27.0       352       144        60
OIR    2025130    131400  -10.9800 -137.9500      27.1       351       144        60
OIR    2025130    131400  -10.9800 -137.9600      27.2       351       142        60
OIR    2025130    131400  -10.9800 -137.9700      27.2       351       141        60
OIR    2025130    131400  -10.9800 -137.9800      27.2       351       140        60
OIR    2025130    131400  -10.9800 -137.9900      27.2       351       139        60
OIR    2025130    131400  -10.9800 -138.0000      27.2       351       141        60
OIR    2025130    131400  -10.9800 -138.0100      27.0       351       143        60
OIR    2025130    131400  -10.9800 -138.0200      26.9       351       147        60
OIR    2025130    131400  -10.9800 -138.0300      26.9       351       148        60
OIR    2025130    131400  -10.9800 -138.0400      26.8       352       146        60
OIR    2025130    131400  -10.9800 -138.0500      26.8       352       144        60
OIR    2025130    131400  -10.9800 -138.0600      26.8       352       145        60
OIR    2025130    131400  -10.9800 -138.0700      26.8       352       145        60
OIR    2025130    131400  -10.9800 -138.0800      26.8       352       144        60
OIR    2025130    131400  -10.9800 -138.0900      26.8       352       145        60
OIR    2025130    131400  -10.9800 -138.1000      26.7       353       145        60
OIR    2025130    131400  -10.9800 -138.1100      26.7       353       146        60
OIR    2025130    131400  -10.9800 -138.1200      26.7       353       146        60
OIR    2025130    131400  -10.9800 -138.1300      26.7       353       147        60
OIR    2025130    131400  -10.9800 -138.1400      26.7       354       147        60
OIR    2025130    131400  -10.9800 -138.1500      26.6       354       147        60
OIR    2025130    131400  -10.9800 -138.1600      26.6       355       146        60
OIR    2025130    131400  -10.9800 -138.1700      26.6       355       147        60
OIR    2025130    131400  -10.9800 -138.1800      26.6       355       147        60
OIR    2025130    131400  -10.9800 -138.1900      26.7       356       147        60
OIR    2025130    131400  -10.9800 -138.2000      26.7       356       147        60
OIR    2025130    131400  -10.9800 -138.2100      26.7       357       147        60
OIR    2025130    131400  -10.9800 -138.2200      26.7       357       149        60
OIR    2025130    131400  -10.9800 -138.2500      26.8       358       151        60
OIR    2025130    131400  -10.9900 -136.6000      43.7        21       151        60
OIR    2025130    131400  -10.9900 -136.6100      43.7        21       150        60
OIR    2025130    131400  -10.9900 -136.6200      43.6        21       146        60
OIR    2025130    131400  -10.9900 -136.6300      43.5        20       141        60
OIR    2025130    131400  -10.9900 -136.6400      43.2        20       140        60
OIR    2025130    131400  -10.9900 -136.6500      42.6        20       139        60
OIR    2025130    131400  -10.9900 -136.6600      41.9        19       138        60
OIR    2025130    131400  -10.9900 -136.6700      41.4        19       138        60
OIR    2025130    131400  -10.9900 -136.6800      41.0        19       138        60
OIR    2025130    131400  -10.9900 -136.6900      40.9        19       138        60
OIR    2025130    131400  -10.9900 -136.7000      40.9        19       137        60
OIR    2025130    131400  -10.9900 -136.7100      40.9        19       132        60
OIR    2025130    131400  -10.9900 -136.7200      40.9        19       128        60
OIR    2025130    131400  -10.9900 -136.7300      40.8        19       129        60
OIR    2025130    131400  -10.9900 -136.7400      40.8        19       131        60
OIR    2025130    131400  -10.9900 -136.7500      40.8        19       132        60
OIR    2025130    131400  -10.9900 -136.7600      40.8        19       133        60
OIR    2025130    131400  -10.9900 -136.7700      40.8        19       134        60
OIR    2025130    131400  -10.9900 -136.7800      40.8        19       135        60
OIR    2025130    131400  -10.9900 -136.7900      40.7        19       136        60
OIR    2025130    131400  -10.9900 -136.8000      40.7        18       136        60
OIR    2025130    131400  -10.9900 -136.8100      40.7        18       135        60
OIR    2025130    131400  -10.9900 -136.8200      40.7        18       137        60
OIR    2025130    131400  -10.9900 -136.8300      40.7        18       139        60
OIR    2025130    131400  -10.9900 -136.8400      40.7        18       141        60
OIR    2025130    131400  -10.9900 -136.8500      40.7        18       143        60
OIR    2025130    131400  -10.9900 -136.8600      40.6        18       141        60
OIR    2025130    131400  -10.9900 -136.8700      40.6        18       140        60
OIR    2025130    131400  -10.9900 -136.8800      40.6        18       140        60
OIR    2025130    131400  -10.9900 -136.8900      40.6        18       139        60
OIR    2025130    131400  -10.9900 -136.9000      40.6        18       139        60
OIR    2025130    131400  -10.9900 -136.9100      40.6        18       139        60
OIR    2025130    131400  -10.9900 -136.9200      40.5        18       139        60
OIR    2025130    131400  -10.9900 -136.9300      40.5        18       139        60
OIR    2025130    131400  -10.9900 -136.9400      40.5        18       138        60
OIR    2025130    131400  -10.9900 -136.9500      40.3        17       139        60
OIR    2025130    131400  -10.9900 -136.9600      40.1        16       142        60
OIR    2025130    131400  -10.9900 -136.9700      39.9        16       141        60
OIR    2025130    131400  -10.9900 -136.9800      39.8        15       140        60
OIR    2025130    131400  -10.9900 -136.9900      39.7        15       140        60
OIR    2025130    131400  -10.9900 -137.0000      39.6        14       139        60
OIR    2025130    131400  -10.9900 -137.0100      39.6        14       139        60
OIR    2025130    131400  -10.9900 -137.0200      39.5        14       139        60
OIR    2025130    131400  -10.9900 -137.0300      39.4        14       138        60
OIR    2025130    131400  -10.9900 -137.0400      39.4        13       138        60
OIR    2025130    131400  -10.9900 -137.0500      39.4        13       137        60
OIR    2025130    131400  -10.9900 -137.0600      39.3        13       138        60
OIR    2025130    131400  -10.9900 -137.0700      39.3        12       138        60
OIR    2025130    131400  -10.9900 -137.0800      39.4        12       134        60
OIR    2025130    131400  -10.9900 -137.0900      39.5        11       130        60
OIR    2025130    131400  -10.9900 -137.1000      39.6        11       127        60
OIR    2025130    131400  -10.9900 -137.1100      39.8        10       124        60
OIR    2025130    131400  -10.9900 -137.1200      40.0        10       127        60
OIR    2025130    131400  -10.9900 -137.1300      40.2        10       129        60
OIR    2025130    131400  -10.9900 -137.1400      40.3        10       128        60
OIR    2025130    131400  -10.9900 -137.1500      40.3        10       127        60
OIR    2025130    131400  -10.9900 -137.1600      40.2        10       123        60
OIR    2025130    131400  -10.9900 -137.1700      40.0         9       120        60
OIR    2025130    131400  -10.9900 -137.1800      39.9         9       117        60
OIR    2025130    131400  -10.9900 -137.1900      39.9         9       123        60
OIR    2025130    131400  -10.9900 -137.2000      39.9         9       128        60
OIR    2025130    131400  -10.9900 -137.2100      40.0         9       130        60
OIR    2025130    131400  -10.9900 -137.2200      40.0         8       131        60
OIR    2025130    131400  -10.9900 -137.2300      39.9         8       130        60
OIR    2025130    131400  -10.9900 -137.2400      39.8         8       131        60
OIR    2025130    131400  -10.9900 -137.2500      39.8         7       132        60
OIR    2025130    131400  -10.9900 -137.2600      39.9         7       132        60
OIR    2025130    131400  -10.9900 -137.2700      39.9         7       130        60
OIR    2025130    131400  -10.9900 -137.2800      40.0         6       130        60
OIR    2025130    131400  -10.9900 -137.2900      40.1         6       131        60
OIR    2025130    131400  -10.9900 -137.3000      40.2         6       130        60
OIR    2025130    131400  -10.9900 -137.3100      40.2         5       130        60
OIR    2025130    131400  -10.9900 -137.3200      40.1         5       130        60
OIR    2025130    131400  -10.9900 -137.3300      40.0         4       130        60
OIR    2025130    131400  -10.9900 -137.3400      39.9         3       130        60
OIR    2025130    131400  -10.9900 -137.3500      39.7         2       132        60
OIR    2025130    131400  -10.9900 -137.3600      39.5         2       134        60
OIR    2025130    131400  -10.9900 -137.3700      39.3         1       136        60
OIR    2025130    131400  -10.9900 -137.3800      39.2         1       138        60
OIR    2025130    131400  -10.9900 -137.3900      39.1         0       135        60
OIR    2025130    131400  -10.9900 -137.4000      39.1       360       132        60
OIR    2025130    131400  -10.9900 -137.4100      39.2       359       132        60
OIR    2025130    131400  -10.9900 -137.4200      39.2       359       131        60
OIR    2025130    131400  -10.9900 -137.4300      39.3       358       133        60
OIR    2025130    131400  -10.9900 -137.4400      39.4       358       134        60
OIR    2025130    131400  -10.9900 -137.4500      39.8       357       132        60
OIR    2025130    131400  -10.9900 -137.4600      39.9       356       130        60
OIR    2025130    131400  -10.9900 -137.4700      39.8       356       129        60
OIR    2025130    131400  -10.9900 -137.4800      39.8       356       127        60
OIR    2025130    131400  -10.9900 -137.4900      39.8       356       125        60
OIR    2025130    131400  -10.9900 -137.5000      39.8       356       125        60
OIR    2025130    131400  -10.9900 -137.5100      39.8       356       126        60
OIR    2025130    131400  -10.9900 -137.5200      39.8       356       127        60
OIR    2025130    131400  -10.9900 -137.5300      39.7       356       127        60
OIR    2025130    131400  -10.9900 -137.5400      39.4       356       129        60
OIR    2025130    131400  -10.9900 -137.5500      38.4       355       129        60
OIR    2025130    131400  -10.9900 -137.5600      36.9       354       128        60
OIR    2025130    131400  -10.9900 -137.5700      35.6       353       126        60
OIR    2025130    131400  -10.9900 -137.5800      34.8       353       128        60
OIR    2025130    131400  -10.9900 -137.5900      34.6       353       130        60
OIR    2025130    131400  -10.9900 -137.6000      34.5       353       131        60
OIR    2025130    131400  -10.9900 -137.6100      34.4       353       131        60
OIR    2025130    131400  -10.9900 -137.6200      34.4       353       130        60
OIR    2025130    131400  -10.9900 -137.6300      34.4       353       127        60
OIR    2025130    131400  -10.9900 -137.6400      34.4       352       121        60
OIR    2025130    131400  -10.9900 -137.6500      34.3       352       121        60
OIR    2025130    131400  -10.9900 -137.6600      34.3       352       121        60
OIR    2025130    131400  -10.9900 -137.6700      34.2       351       122        60
OIR    2025130    131400  -10.9900 -137.6800      34.0       351       123        60
OIR    2025130    131400  -10.9900 -137.6900      33.7       351       125        60
OIR    2025130    131400  -10.9900 -137.7000      33.5       351       125        60
OIR    2025130    131400  -10.9900 -137.7100      33.3       351       125        60
OIR    2025130    131400  -10.9900 -137.7200      32.9       351       125        60
OIR    2025130    131400  -10.9900 -137.7300      32.2       351       126        60
OIR    2025130    131400  -10.9900 -137.7400      31.6       350       128        60
OIR    2025130    131400  -10.9900 -137.7500      31.1       350       131        60
OIR    2025130    131400  -10.9900 -137.7600      30.7       350       131        60
OIR    2025130    131400  -10.9900 -137.7700      30.3       350       130        60
OIR    2025130    131400  -10.9900 -137.7800      29.8       350       129        60
OIR    2025130    131400  -10.9900 -137.7900      28.7       350       128        60
OIR    2025130    131400  -10.9900 -137.8000      27.9       351       129        60
OIR    2025130    131400  -10.9900 -137.8100      27.4       351       132        60
OIR    2025130    131400  -10.9900 -137.8200      27.1       351       136        60
OIR    2025130    131400  -10.9900 -137.8300      26.8       351       138        60
OIR    2025130    131400  -10.9900 -137.8400      26.7       351       139        60
OIR    2025130    131400  -10.9900 -137.8500      26.6       351       140        60
OIR    2025130    131400  -10.9900 -137.8600      26.6       351       139        60
OIR    2025130    131400  -10.9900 -137.8700      26.6       351       139        60
OIR    2025130    131400  -10.9900 -137.8800      26.6       351       140        60
OIR    2025130    131400  -10.9900 -137.8900      26.6       351       141        60
OIR    2025130    131400  -10.9900 -137.9000      26.7       351       142        60
OIR    2025130    131400  -10.9900 -137.9100      26.9       351       144        60
OIR    2025130    131400  -10.9900 -137.9200      27.1       351       145        60
OIR    2025130    131400  -10.9900 -137.9300      27.2       351       143        60
OIR    2025130    131400  -10.9900 -137.9400      27.2       351       141        60
OIR    2025130    131400  -10.9900 -137.9500      27.3       351       141        60
OIR    2025130    131400  -10.9900 -137.9600      27.3       351       140        60
OIR    2025130    131400  -10.9900 -137.9700      27.3       351       139        60
OIR    2025130    131400  -10.9900 -137.9800      27.3       351       138        60
OIR    2025130    131400  -10.9900 -137.9900      27.3       351       137        60
OIR    2025130    131400  -10.9900 -138.0000      27.3       351       138        60
OIR    2025130    131400  -10.9900 -138.0100      27.2       351       140        60
OIR    2025130    131400  -10.9900 -138.0200      27.1       351       146        60
OIR    2025130    131400  -10.9900 -138.0300      27.0       351       148        60
OIR    2025130    131400  -10.9900 -138.0400      27.0       351       146        60
OIR    2025130    131400  -10.9900 -138.0500      26.9       352       144        60
OIR    2025130    131400  -10.9900 -138.0600      26.9       352       144        60
OIR    2025130    131400  -10.9900 -138.0700      26.9       352       144        60
OIR    2025130    131400  -10.9900 -138.0800      26.9       352       144        60
OIR    2025130    131400  -10.9900 -138.0900      26.9       352       145        60
OIR    2025130    131400  -10.9900 -138.1000      26.8       352       145        60
OIR    2025130    131400  -10.9900 -138.1100      26.8       353       145        60
OIR    2025130    131400  -10.9900 -138.1200      26.8       353       146        60
OIR    2025130    131400  -10.9900 -138.1300      26.7       353       147        60
OIR    2025130    131400  -10.9900 -138.1400      26.7       353       147        60
OIR    2025130    131400  -10.9900 -138.1500      26.7       354       146        60
OIR    2025130    131400  -10.9900 -138.1600      26.6       354       145        60
OIR    2025130    131400  -10.9900 -138.1700      26.7       354       145        60
OIR    2025130    131400  -10.9900 -138.1800      26.7       355       145        60
OIR    2025130    131400  -10.9900 -138.1900      26.7       355       144        60
OIR    2025130    131400  -10.9900 -138.2000      26.7       356       144        60
OIR    2025130    131400  -10.9900 -138.2100      26.7       356       144        60
OIR    2025130    131400  -10.9900 -138.2200      26.7       357       146        60
OIR    2025130    131400  -10.9900 -138.2300      26.7       357       149        60
OIR    2025130    131400  -10.9900 -138.2400      26.7       358       150        60
OIR    2025130    131400  -10.9900 -138.2500      26.8       358       150        60
OIR    2025130    131400  -10.9900 -138.2600      26.9       358       149        60
OIR    2025130    131400  -10.9900 -138.2700      26.9       358       149        60
OIR    2025130    131400  -11.0000 -134.1500      13.1        43       123        60
OIR    2025130    131400  -11.0000 -136.6200      41.5        20       149        60
OIR    2025130    131400  -11.0000 -136.6300      41.4        19       147        60
OIR    2025130    131400  -11.0000 -136.6400      41.2        19       144        60
OIR    2025130    131400  -11.0000 -136.6500      41.1        19       142        60
OIR    2025130    131400  -11.0000 -136.6600      40.9        18       140        60
OIR    2025130    131400  -11.0000 -136.6700      40.8        19       139        60
OIR    2025130    131400  -11.0000 -136.6800      40.9        19       138        60
OIR    2025130    131400  -11.0000 -136.6900      40.9        19       136        60
OIR    2025130    131400  -11.0000 -136.7000      40.9        19       134        60
OIR    2025130    131400  -11.0000 -136.7100      40.8        19       131        60
OIR    2025130    131400  -11.0000 -136.7200      40.8        19       129        60
OIR    2025130    131400  -11.0000 -136.7300      40.8        19       130        60
OIR    2025130    131400  -11.0000 -136.7400      40.8        19       130        60
OIR    2025130    131400  -11.0000 -136.7500      40.7        19       133        60
OIR    2025130    131400  -11.0000 -136.7600      40.7        19       135        60
OIR    2025130    131400  -11.0000 -136.7700      40.7        19       137        60
OIR    2025130    131400  -11.0000 -136.7800      40.7        19       138        60
OIR    2025130    131400  -11.0000 -136.7900      40.6        18       138        60
OIR    2025130    131400  -11.0000 -136.8000      40.6        18       138        60
OIR    2025130    131400  -11.0000 -136.8100      40.6        18       138        60
OIR    2025130    131400  -11.0000 -136.8200      40.6        18       140        60
OIR    2025130    131400  -11.0000 -136.8300      40.6        18       141        60
OIR    2025130    131400  -11.0000 -136.8400      40.6        18       143        60
OIR    2025130    131400  -11.0000 -136.8500      40.6        18       145        60
OIR    2025130    131400  -11.0000 -136.8600      40.6        18       144        60
OIR    2025130    131400  -11.0000 -136.8700      40.6        18       143        60
OIR    2025130    131400  -11.0000 -136.8800      40.6        18       142        60
OIR    2025130    131400  -11.0000 -136.8900      40.6        18       142        60
OIR    2025130    131400  -11.0000 -136.9000      40.6        18       141        60
OIR    2025130    131400  -11.0000 -136.9100      40.5        18       141        60
OIR    2025130    131400  -11.0000 -136.9200      40.5        18       141        60
OIR    2025130    131400  -11.0000 -136.9300      40.5        18       141        60
OIR    2025130    131400  -11.0000 -136.9400      40.4        18       141        60
OIR    2025130    131400  -11.0000 -136.9500      40.2        17       142        60
OIR    2025130    131400  -11.0000 -136.9600      40.1        16       144        60
OIR    2025130    131400  -11.0000 -136.9700      39.9        16       143        60
OIR    2025130    131400  -11.0000 -136.9800      39.8        15       143        60
OIR    2025130    131400  -11.0000 -136.9900      39.7        15       142        60
OIR    2025130    131400  -11.0000 -137.0000      39.5        14       141        60
OIR    2025130    131400  -11.0000 -137.0100      39.4        14       141        60
OIR    2025130    131400  -11.0000 -137.0200      39.4        14       140        60
OIR    2025130    131400  -11.0000 -137.0300      39.3        14       139        60
OIR    2025130    131400  -11.0000 -137.0400      39.3        13       140        60
OIR    2025130    131400  -11.0000 -137.0500      39.2        13       141        60
OIR    2025130    131400  -11.0000 -137.0600      39.2        13       140        60
OIR    2025130    131400  -11.0000 -137.0700      39.2        12       139        60
OIR    2025130    131400  -11.0000 -137.0800      39.2        12       136        60
OIR    2025130    131400  -11.0000 -137.0900      39.3        11       134        60
OIR    2025130    131400  -11.0000 -137.1000      39.4        11       131        60
OIR    2025130    131400  -11.0000 -137.1100      39.4        10       128        60
OIR    2025130    131400  -11.0000 -137.1200      39.4        10       128        60
OIR    2025130    131400  -11.0000 -137.1300      39.5        10       128        60
OIR    2025130    131400  -11.0000 -137.1400      39.5        10       127        60
OIR    2025130    131400  -11.0000 -137.1500      39.4        10       126        60
OIR    2025130    131400  -11.0000 -137.1600      39.3        10       125        60
OIR    2025130    131400  -11.0000 -137.1700      39.3        10       125        60
OIR    2025130    131400  -11.0000 -137.1800      39.4        10       125        60
OIR    2025130    131400  -11.0000 -137.1900      39.5         9       128        60
OIR    2025130    131400  -11.0000 -137.2000      39.6         9       130        60
OIR    2025130    131400  -11.0000 -137.2100      39.7         9       131        60
OIR    2025130    131400  -11.0000 -137.2200      39.8         8       131        60
OIR    2025130    131400  -11.0000 -137.2300      39.8         8       131        60
OIR    2025130    131400  -11.0000 -137.2400      39.7         8       131        60
OIR    2025130    131400  -11.0000 -137.2500      39.8         7       132        60
OIR    2025130    131400  -11.0000 -137.2600      39.8         7       132        60
OIR    2025130    131400  -11.0000 -137.2700      39.9         7       131        60
OIR    2025130    131400  -11.0000 -137.2800      39.9         6       131        60
OIR    2025130    131400  -11.0000 -137.2900      40.0         6       131        60
OIR    2025130    131400  -11.0000 -137.3000      40.0         6       130        60
OIR    2025130    131400  -11.0000 -137.3100      40.0         5       130        60
OIR    2025130    131400  -11.0000 -137.3200      39.9         5       129        60
OIR    2025130    131400  -11.0000 -137.3300      39.7         4       128        60
OIR    2025130    131400  -11.0000 -137.3400      39.5         3       129        60
OIR    2025130    131400  -11.0000 -137.3500      39.4         2       131        60
OIR    2025130    131400  -11.0000 -137.3600      39.3         2       133        60
OIR    2025130    131400  -11.0000 -137.3700      39.2         1       134        60
OIR    2025130    131400  -11.0000 -137.3800      39.0         1       136        60
OIR    2025130    131400  -11.0000 -137.3900      39.0       360       135        60
OIR    2025130    131400  -11.0000 -137.4000      39.0       360       134        60
OIR    2025130    131400  -11.0000 -137.4100      39.0       359       133        60
OIR    2025130    131400  -11.0000 -137.4200      39.0       359       132        60
OIR    2025130    131400  -11.0000 -137.4300      39.1       358       132        60
OIR    2025130    131400  -11.0000 -137.4400      39.2       358       131        60
OIR    2025130    131400  -11.0000 -137.4500      39.5       357       129        60
OIR    2025130    131400  -11.0000 -137.4600      39.8       356       128        60
OIR    2025130    131400  -11.0000 -137.4700      39.9       356       128        60
OIR    2025130    131400  -11.0000 -137.4800      39.8       356       128        60
OIR    2025130    131400  -11.0000 -137.4900      39.8       356       128        60
OIR    2025130    131400  -11.0000 -137.5000      39.8       356       129        60
OIR    2025130    131400  -11.0000 -137.5100      39.8       356       131        60
OIR    2025130    131400  -11.0000 -137.5200      39.8       356       130        60
OIR    2025130    131400  -11.0000 -137.5300      39.7       356       126        60
OIR    2025130    131400  -11.0000 -137.5400      39.2       356       125        60
OIR    2025130    131400  -11.0000 -137.5500      38.6       355       124        60
OIR    2025130    131400  -11.0000 -137.5600      37.6       355       125        60
OIR    2025130    131400  -11.0000 -137.5700      36.2       354       125        60
OIR    2025130    131400  -11.0000 -137.5800      35.1       353       126        60
OIR    2025130    131400  -11.0000 -137.5900      34.7       353       126        60
OIR    2025130    131400  -11.0000 -137.6000      34.5       353       124        60
OIR    2025130    131400  -11.0000 -137.6100      34.4       353       124        60
OIR    2025130    131400  -11.0000 -137.6200      34.4       353       124        60
OIR    2025130    131400  -11.0000 -137.6300      34.3       352       123        60
OIR    2025130    131400  -11.0000 -137.6400      34.3       352       121        60
OIR    2025130    131400  -11.0000 -137.6500      34.1       352       120        60
OIR    2025130    131400  -11.0000 -137.6600      33.9       352       120        60
OIR    2025130    131400  -11.0000 -137.6700      33.7       351       120        60
OIR    2025130    131400  -11.0000 -137.6800      33.6       351       121        60
OIR    2025130    131400  -11.0000 -137.6900      33.5       351       123        60
OIR    2025130    131400  -11.0000 -137.7000      33.3       351       125        60
OIR    2025130    131400  -11.0000 -137.7100      33.0       351       127        60
OIR    2025130    131400  -11.0000 -137.7200      32.5       351       127        60
OIR    2025130    131400  -11.0000 -137.7300      31.8       350       128        60
OIR    2025130    131400  -11.0000 -137.7400      31.3       350       129        60
OIR    2025130    131400  -11.0000 -137.7500      31.0       350       132        60
OIR    2025130    131400  -11.0000 -137.7600      30.6       350       131        60
OIR    2025130    131400  -11.0000 -137.7700      30.1       350       131        60
OIR    2025130    131400  -11.0000 -137.7800      29.5       350       130        60
OIR    2025130    131400  -11.0000 -137.7900      28.8       350       130        60
OIR    2025130    131400  -11.0000 -137.8000      28.0       351       132        60
OIR    2025130    131400  -11.0000 -137.8100      27.5       351       133        60
OIR    2025130    131400  -11.0000 -137.8200      27.1       350       134        60
OIR    2025130    131400  -11.0000 -137.8300      26.9       350       135        60
OIR    2025130    131400  -11.0000 -137.8400      26.7       351       135        60
OIR    2025130    131400  -11.0000 -137.8500      26.7       351       135        60
OIR    2025130    131400  -11.0000 -137.8600      26.6       351       135        60
OIR    2025130    131400  -11.0000 -137.8700      26.6       351       137        60
OIR    2025130    131400  -11.0000 -137.8800      26.7       351       138        60
OIR    2025130    131400  -11.0000 -137.8900      26.8       351       140        60
OIR    2025130    131400  -11.0000 -137.9000      26.9       351       142        60
OIR    2025130    131400  -11.0000 -137.9100      27.1       351       142        60
OIR    2025130    131400  -11.0000 -137.9200      27.2       351       141        60
OIR    2025130    131400  -11.0000 -137.9300      27.3       351       141        60
OIR    2025130    131400  -11.0000 -137.9400      27.3       351       141        60
OIR    2025130    131400  -11.0000 -137.9500      27.3       351       141        60
OIR    2025130    131400  -11.0000 -137.9600      27.3       351       140        60
OIR    2025130    131400  -11.0000 -137.9700      27.3       351       139        60
OIR    2025130    131400  -11.0000 -137.9800      27.3       351       139        60
OIR    2025130    131400  -11.0000 -137.9900      27.3       351       138        60
OIR    2025130    131400  -11.0000 -138.0000      27.3       351       139        60
OIR    2025130    131400  -11.0000 -138.0100      27.3       351       141        60
OIR    2025130    131400  -11.0000 -138.0200      27.3       351       144        60
OIR    2025130    131400  -11.0000 -138.0300      27.3       351       147        60
OIR    2025130    131400  -11.0000 -138.0400      27.2       351       147        60
OIR    2025130    131400  -11.0000 -138.0500      27.2       351       147        60
OIR    2025130    131400  -11.0000 -138.0600      27.3       351       146        60
OIR    2025130    131400  -11.0000 -138.0700      27.2       351       145        60
OIR    2025130    131400  -11.0000 -138.0800      27.2       352       145        60
OIR    2025130    131400  -11.0000 -138.0900      27.2       352       145        60
OIR    2025130    131400  -11.0000 -138.1000      27.2       352       145        60
OIR    2025130    131400  -11.0000 -138.1100      27.2       352       145        60
OIR    2025130    131400  -11.0000 -138.1200      27.1       352       145        60
OIR    2025130    131400  -11.0000 -138.1300      27.1       353       146        60
OIR    2025130    131400  -11.0000 -138.1400      27.0       353       147        60
OIR    2025130    131400  -11.0000 -138.1500      27.0       353       147        60
OIR    2025130    131400  -11.0000 -138.1600      26.9       354       147        60
OIR    2025130    131400  -11.0000 -138.1700      26.8       354       146        60
OIR    2025130    131400  -11.0000 -138.1800      26.8       354       145        60
OIR    2025130    131400  -11.0000 -138.1900      26.8       355       145        60
OIR    2025130    131400  -11.0000 -138.2000      26.8       355       145        60
OIR    2025130    131400  -11.0000 -138.2100      26.7       356       144        60
OIR    2025130    131400  -11.0000 -138.2200      26.7       356       146        60
OIR    2025130    131400  -11.0000 -138.2300      26.8       357       147        60
OIR    2025130    131400  -11.0000 -138.2400      26.8       357       147        60
OIR    2025130    131400  -11.0000 -138.2500      26.8       358       147        60
OIR    2025130    131400  -11.0000 -138.2600      26.9       358       147        60
OIR    2025130    131400  -11.0000 -138.2700      26.9       358       148        60
OIR    2025130    131400  -11.0100 -136.6400      40.6        18       149        60
OIR    2025130    131400  -11.0100 -136.6500      40.6        18       145        60
OIR    2025130    131400  -11.0100 -136.6600      40.6        18       142        60
OIR    2025130    131400  -11.0100 -136.6700      40.5        18       139        60
OIR    2025130    131400  -11.0100 -136.6800      40.5        18       137        60
OIR    2025130    131400  -11.0100 -136.6900      40.5        19       134        60
OIR    2025130    131400  -11.0100 -136.7000      40.5        19       131        60
OIR    2025130    131400  -11.0100 -136.7100      40.5        19       131        60
OIR    2025130    131400  -11.0100 -136.7200      40.5        19       131        60
OIR    2025130    131400  -11.0100 -136.7300      40.6        19       131        60
OIR    2025130    131400  -11.0100 -136.7400      40.6        19       130        60
OIR    2025130    131400  -11.0100 -136.7500      40.6        19       133        60
OIR    2025130    131400  -11.0100 -136.7600      40.6        19       136        60
OIR    2025130    131400  -11.0100 -136.7700      40.6        19       140        60
OIR    2025130    131400  -11.0100 -136.7800      40.6        19       140        60
OIR    2025130    131400  -11.0100 -136.7900      40.6        18       140        60
OIR    2025130    131400  -11.0100 -136.8000      40.6        18       140        60
OIR    2025130    131400  -11.0100 -136.8100      40.6        18       141        60
OIR    2025130    131400  -11.0100 -136.8200      40.6        18       142        60
OIR    2025130    131400  -11.0100 -136.8300      40.6        18       144        60
OIR    2025130    131400  -11.0100 -136.8400      40.6        18       145        60
OIR    2025130    131400  -11.0100 -136.8500      40.6        18       147        60
OIR    2025130    131400  -11.0100 -136.8600      40.6        18       146        60
OIR    2025130    131400  -11.0100 -136.8700      40.6        18       146        60
OIR    2025130    131400  -11.0100 -136.8800      40.6        18       145        60
OIR    2025130    131400  -11.0100 -136.8900      40.6        18       144        60
OIR    2025130    131400  -11.0100 -136.9000      40.6        18       143        60
OIR    2025130    131400  -11.0100 -136.9100      40.5        18       143        60
OIR    2025130    131400  -11.0100 -136.9200      40.5        18       143        60
OIR    2025130    131400  -11.0100 -136.9300      40.5        18       144        60
OIR    2025130    131400  -11.0100 -136.9400      40.4        18       144        60
OIR    2025130    131400  -11.0100 -136.9500      40.2        17       145        60
OIR    2025130    131400  -11.0100 -136.9600      40.0        16       146        60
OIR    2025130    131400  -11.0100 -136.9700      39.9        16       145        60
OIR    2025130    131400  -11.0100 -136.9800      39.7        15       145        60
OIR    2025130    131400  -11.0100 -136.9900      39.6        15       144        60
OIR    2025130    131400  -11.0100 -137.0000      39.4        14       143        60
OIR    2025130    131400  -11.0100 -137.0100      39.3        14       142        60
OIR    2025130    131400  -11.0100 -137.0200      39.2        14       141        60
OIR    2025130    131400  -11.0100 -137.0300      39.2        13       140        60
OIR    2025130    131400  -11.0100 -137.0400      39.1        13       142        60
OIR    2025130    131400  -11.0100 -137.0500      39.1        13       144        60
OIR    2025130    131400  -11.0100 -137.0600      39.1        13       143        60
OIR    2025130    131400  -11.0100 -137.0700      39.1        12       140        60
OIR    2025130    131400  -11.0100 -137.0800      39.1        11       139        60
OIR    2025130    131400  -11.0100 -137.0900      39.1        11       137        60
OIR    2025130    131400  -11.0100 -137.1000      39.2        11       134        60
OIR    2025130    131400  -11.0100 -137.1100      39.2        11       131        60
OIR    2025130    131400  -11.0100 -137.1200      39.1        10       129        60
OIR    2025130    131400  -11.0100 -137.1300      39.1        10       127        60
OIR    2025130    131400  -11.0100 -137.1400      39.1        10       125        60
OIR    2025130    131400  -11.0100 -137.1500      39.0        10       126        60
OIR    2025130    131400  -11.0100 -137.1600      39.1        10       126        60
OIR    2025130    131400  -11.0100 -137.1700      39.1        10       129        60
OIR    2025130    131400  -11.0100 -137.1800      39.3        10       132        60
OIR    2025130    131400  -11.0100 -137.1900      39.4         9       132        60
OIR    2025130    131400  -11.0100 -137.2000      39.5         9       132        60
OIR    2025130    131400  -11.0100 -137.2100      39.5         9       132        60
OIR    2025130    131400  -11.0100 -137.2200      39.6         8       131        60
OIR    2025130    131400  -11.0100 -137.2300      39.7         8       131        60
OIR    2025130    131400  -11.0100 -137.2400      39.7         8       131        60
OIR    2025130    131400  -11.0100 -137.2500      39.7         7       132        60
OIR    2025130    131400  -11.0100 -137.2600      39.8         7       132        60
OIR    2025130    131400  -11.0100 -137.2700      39.8         6       131        60
OIR    2025130    131400  -11.0100 -137.2800      39.9         6       131        60
OIR    2025130    131400  -11.0100 -137.2900      39.9         6       131        60
OIR    2025130    131400  -11.0100 -137.3000      39.9         6       130        60
OIR    2025130    131400  -11.0100 -137.3100      39.8         5       129        60
OIR    2025130    131400  -11.0100 -137.3200      39.7         5       127        60
OIR    2025130    131400  -11.0100 -137.3300      39.6         4       126        60
OIR    2025130    131400  -11.0100 -137.3400      39.4         3       127        60
OIR    2025130    131400  -11.0100 -137.3500      39.3         2       129        60
OIR    2025130    131400  -11.0100 -137.3600      39.2         2       131        60
OIR    2025130    131400  -11.0100 -137.3700      39.1         1       132        60
OIR    2025130    131400  -11.0100 -137.3800      39.0         1       134        60
OIR    2025130    131400  -11.0100 -137.3900      39.0       360       133        60
OIR    2025130    131400  -11.0100 -137.4000      39.0       359       133        60
OIR    2025130    131400  -11.0100 -137.4100      39.0       359       132        60
OIR    2025130    131400  -11.0100 -137.4200      39.0       359       132        60
OIR    2025130    131400  -11.0100 -137.4300      39.1       358       130        60
OIR    2025130    131400  -11.0100 -137.4400      39.2       358       129        60
OIR    2025130    131400  -11.0100 -137.4500      39.4       357       127        60
OIR    2025130    131400  -11.0100 -137.4600      39.8       356       126        60
OIR    2025130    131400  -11.0100 -137.4700      39.8       356       127        60
OIR    2025130    131400  -11.0100 -137.4800      39.8       356       127        60
OIR    2025130    131400  -11.0100 -137.4900      39.8       356       128        60
OIR    2025130    131400  -11.0100 -137.5000      39.8       356       131        60
OIR    2025130    131400  -11.0100 -137.5100      39.8       356       134        60
OIR    2025130    131400  -11.0100 -137.5200      39.8       356       131        60
OIR    2025130    131400  -11.0100 -137.5300      39.7       356       126        60
OIR    2025130    131400  -11.0100 -137.5400      39.3       355       123        60
OIR    2025130    131400  -11.0100 -137.5500      38.7       355       122        60
OIR    2025130    131400  -11.0100 -137.5600      37.8       355       123        60
OIR    2025130    131400  -11.0100 -137.5700      36.7       354       125        60
OIR    2025130    131400  -11.0100 -137.5800      35.6       353       125        60
OIR    2025130    131400  -11.0100 -137.5900      34.9       353       124        60
OIR    2025130    131400  -11.0100 -137.6000      34.6       353       122        60
OIR    2025130    131400  -11.0100 -137.6100      34.4       353       121        60
OIR    2025130    131400  -11.0100 -137.6200      34.3       353       122        60
OIR    2025130    131400  -11.0100 -137.6300      34.3       352       122        60
OIR    2025130    131400  -11.0100 -137.6400      34.2       352       122        60
OIR    2025130    131400  -11.0100 -137.6500      34.0       352       121        60
OIR    2025130    131400  -11.0100 -137.6600      33.7       352       121        60
OIR    2025130    131400  -11.0100 -137.6700      33.6       351       121        60
OIR    2025130    131400  -11.0100 -137.6800      33.5       351       121        60
OIR    2025130    131400  -11.0100 -137.6900      33.4       351       124        60
OIR    2025130    131400  -11.0100 -137.7000      33.2       351       126        60
OIR    2025130    131400  -11.0100 -137.7100      32.9       351       128        60
OIR    2025130    131400  -11.0100 -137.7200      32.4       351       129        60
OIR    2025130    131400  -11.0100 -137.7300      31.6       350       129        60
OIR    2025130    131400  -11.0100 -137.7400      31.1       350       130        60
OIR    2025130    131400  -11.0100 -137.7500      30.8       350       132        60
OIR    2025130    131400  -11.0100 -137.7600      30.6       350       131        60
OIR    2025130    131400  -11.0100 -137.7700      29.9       350       131        60
OIR    2025130    131400  -11.0100 -137.7800      29.2       350       131        60
OIR    2025130    131400  -11.0100 -137.7900      28.5       350       131        60
OIR    2025130    131400  -11.0100 -137.8000      27.9       350       133        60
OIR    2025130    131400  -11.0100 -137.8100      27.6       350       134        60
OIR    2025130    131400  -11.0100 -137.8200      27.3       350       133        60
OIR    2025130    131400  -11.0100 -137.8300      27.0       350       132        60
OIR    2025130    131400  -11.0100 -137.8400      26.8       350       131        60
OIR    2025130    131400  -11.0100 -137.8500      26.7       351       132        60
OIR    2025130    131400  -11.0100 -137.8600      26.7       351       134        60
OIR    2025130    131400  -11.0100 -137.8700      26.7       351       136        60
OIR    2025130    131400  -11.0100 -137.8800      26.8       351       138        60
OIR    2025130    131400  -11.0100 -137.8900      27.0       351       140        60
OIR    2025130    131400  -11.0100 -137.9000      27.1       351       142        60
OIR    2025130    131400  -11.0100 -137.9100      27.2       351       140        60
OIR    2025130    131400  -11.0100 -137.9200      27.3       351       139        60
OIR    2025130    131400  -11.0100 -137.9300      27.3       351       139        60
OIR    2025130    131400  -11.0100 -137.9400      27.3       351       140        60
OIR    2025130    131400  -11.0100 -137.9500      27.3       351       140        60
OIR    2025130    131400  -11.0100 -137.9600      27.3       351       140        60
OIR    2025130    131400  -11.0100 -137.9700      27.3       351       139        60
OIR    2025130    131400  -11.0100 -137.9800      27.3       351       139        60
OIR    2025130    131400  -11.0100 -137.9900      27.3       351       139        60
OIR    2025130    131400  -11.0100 -138.0000      27.3       351       140        60
OIR    2025130    131400  -11.0100 -138.0100      27.3       351       140        60
OIR    2025130    131400  -11.0100 -138.0200      27.3       351       143        60
OIR    2025130    131400  -11.0100 -138.0300      27.3       351       145        60
OIR    2025130    131400  -11.0100 -138.0400      27.3       351       146        60
OIR    2025130    131400  -11.0100 -138.0500      27.3       351       147        60
OIR    2025130    131400  -11.0100 -138.0600      27.3       351       146        60
OIR    2025130    131400  -11.0100 -138.0700      27.3       351       145        60
OIR    2025130    131400  -11.0100 -138.0800      27.3       351       145        60
OIR    2025130    131400  -11.0100 -138.0900      27.3       352       145        60
OIR    2025130    131400  -11.0100 -138.1000      27.3       352       145        60
OIR    2025130    131400  -11.0100 -138.1100      27.2       352       144        60
OIR    2025130    131400  -11.0100 -138.1200      27.2       352       143        60
OIR    2025130    131400  -11.0100 -138.1300      27.2       352       146        60
OIR    2025130    131400  -11.0100 -138.1400      27.2       353       147        60
OIR    2025130    131400  -11.0100 -138.1500      27.1       353       147        60
OIR    2025130    131400  -11.0100 -138.1600      27.0       353       147        60
OIR    2025130    131400  -11.0100 -138.1700      27.0       353       146        60
OIR    2025130    131400  -11.0100 -138.1800      26.9       354       145        60
OIR    2025130    131400  -11.0100 -138.1900      26.9       354       146        60
OIR    2025130    131400  -11.0100 -138.2000      26.9       355       145        60
OIR    2025130    131400  -11.0100 -138.2100      26.9       355       145        60
OIR    2025130    131400  -11.0100 -138.2200      26.9       355       145        60
OIR    2025130    131400  -11.0100 -138.2300      26.9       356       146        60
OIR    2025130    131400  -11.0100 -138.2400      26.8       357       146        60
OIR    2025130    131400  -11.0100 -138.2500      26.9       357       145        60
OIR    2025130    131400  -11.0100 -138.2600      26.9       358       145        60
OIR    2025130    131400  -11.0100 -138.2700      26.9       358       146        60
OIR    2025130    131400  -11.0200 -136.6400      40.4        18       149        60
OIR    2025130    131400  -11.0200 -136.6500      40.4        18       145        60
OIR    2025130    131400  -11.0200 -136.6600      40.4        18       141        60
OIR    2025130    131400  -11.0200 -136.6700      40.4        18       138        60
OIR    2025130    131400  -11.0200 -136.6800      40.4        18       136        60
OIR    2025130    131400  -11.0200 -136.6900      40.3        19       134        60
OIR    2025130    131400  -11.0200 -136.7000      40.3        19       131        60
OIR    2025130    131400  -11.0200 -136.7100      40.3        19       131        60
OIR    2025130    131400  -11.0200 -136.7200      40.3        19       132        60
OIR    2025130    131400  -11.0200 -136.7300      40.3        19       133        60
OIR    2025130    131400  -11.0200 -136.7400      40.4        19       133        60
OIR    2025130    131400  -11.0200 -136.7500      40.4        19       135        60
OIR    2025130    131400  -11.0200 -136.7600      40.5        19       138        60
OIR    2025130    131400  -11.0200 -136.7700      40.5        19       141        60
OIR    2025130    131400  -11.0200 -136.7800      40.5        18       141        60
OIR    2025130    131400  -11.0200 -136.7900      40.5        18       141        60
OIR    2025130    131400  -11.0200 -136.8000      40.5        18       141        60
OIR    2025130    131400  -11.0200 -136.8100      40.5        18       141        60
OIR    2025130    131400  -11.0200 -136.8200      40.6        18       143        60
OIR    2025130    131400  -11.0200 -136.8300      40.6        18       145        60
OIR    2025130    131400  -11.0200 -136.8400      40.6        18       146        60
OIR    2025130    131400  -11.0200 -136.8500      40.6        18       147        60
OIR    2025130    131400  -11.0200 -136.8600      40.6        18       147        60
OIR    2025130    131400  -11.0200 -136.8700      40.6        18       146        60
OIR    2025130    131400  -11.0200 -136.8800      40.6        18       145        60
OIR    2025130    131400  -11.0200 -136.8900      40.6        18       144        60
OIR    2025130    131400  -11.0200 -136.9000      40.5        18       144        60
OIR    2025130    131400  -11.0200 -136.9100      40.5        18       143        60
OIR    2025130    131400  -11.0200 -136.9200      40.5        18       144        60
OIR    2025130    131400  -11.0200 -136.9300      40.5        18       144        60
OIR    2025130    131400  -11.0200 -136.9400      40.3        17       144        60
OIR    2025130    131400  -11.0200 -136.9500      40.1        17       146        60
OIR    2025130    131400  -11.0200 -136.9600      40.0        16       148        60
OIR    2025130    131400  -11.0200 -136.9700      39.8        16       145        60
OIR    2025130    131400  -11.0200 -136.9800      39.7        15       144        60
OIR    2025130    131400  -11.0200 -136.9900      39.5        15       143        60
OIR    2025130    131400  -11.0200 -137.0000      39.3        14       143        60
OIR    2025130    131400  -11.0200 -137.0100      39.2        14       142        60
OIR    2025130    131400  -11.0200 -137.0200      39.1        14       141        60
OIR    2025130    131400  -11.0200 -137.0300      39.0        13       141        60
OIR    2025130    131400  -11.0200 -137.0400      39.0        13       142        60
OIR    2025130    131400  -11.0200 -137.0500      39.0        13       145        60
OIR    2025130    131400  -11.0200 -137.0600      39.0        13       143        60
OIR    2025130    131400  -11.0200 -137.0700      39.0        12       140        60
OIR    2025130    131400  -11.0200 -137.0800      39.0        12       139        60
OIR    2025130    131400  -11.0200 -137.0900      39.0        11       138        60
OIR    2025130    131400  -11.0200 -137.1000      39.0        11       135        60
OIR    2025130    131400  -11.0200 -137.1100      39.1        11       132        60
OIR    2025130    131400  -11.0200 -137.1200      39.0        10       131        60
OIR    2025130    131400  -11.0200 -137.1300      39.0        10       129        60
OIR    2025130    131400  -11.0200 -137.1400      39.0        10       128        60
OIR    2025130    131400  -11.0200 -137.1500      39.0        10       128        60
OIR    2025130    131400  -11.0200 -137.1600      39.0        10       129        60
OIR    2025130    131400  -11.0200 -137.1700      39.1        10       132        60
OIR    2025130    131400  -11.0200 -137.1800      39.1        10       135        60
OIR    2025130    131400  -11.0200 -137.1900      39.3         9       135        60
OIR    2025130    131400  -11.0200 -137.2000      39.4         9       134        60
OIR    2025130    131400  -11.0200 -137.2100      39.4         9       133        60
OIR    2025130    131400  -11.0200 -137.2200      39.5         8       132        60
OIR    2025130    131400  -11.0200 -137.2300      39.6         8       130        60
OIR    2025130    131400  -11.0200 -137.2400      39.7         7       130        60
OIR    2025130    131400  -11.0200 -137.2500      39.8         7       131        60
OIR    2025130    131400  -11.0200 -137.2600      39.9         7       131        60
OIR    2025130    131400  -11.0200 -137.2700      39.9         6       128        60
OIR    2025130    131400  -11.0200 -137.2800      39.9         6       127        60
OIR    2025130    131400  -11.0200 -137.2900      39.9         6       127        60
OIR    2025130    131400  -11.0200 -137.3000      39.9         5       125        60
OIR    2025130    131400  -11.0200 -137.3100      39.9         5       123        60
OIR    2025130    131400  -11.0200 -137.3200      39.8         4       122        60
OIR    2025130    131400  -11.0200 -137.3300      39.6         4       122        60
OIR    2025130    131400  -11.0200 -137.3400      39.5         3       123        60
OIR    2025130    131400  -11.0200 -137.3500      39.4         2       125        60
OIR    2025130    131400  -11.0200 -137.3600      39.2         2       128        60
OIR    2025130    131400  -11.0200 -137.3700      39.1         1       129        60
OIR    2025130    131400  -11.0200 -137.3800      38.9         0       129        60
OIR    2025130    131400  -11.0200 -137.3900      38.9       360       129        60
OIR    2025130    131400  -11.0200 -137.4000      38.9       359       128        60
OIR    2025130    131400  -11.0200 -137.4100      39.0       359       128        60
OIR    2025130    131400  -11.0200 -137.4200      39.0       359       128        60
OIR    2025130    131400  -11.0200 -137.4300      39.0       358       128        60
OIR    2025130    131400  -11.0200 -137.4400      39.1       358       127        60
OIR    2025130    131400  -11.0200 -137.4500      39.3       357       126        60
OIR    2025130    131400  -11.0200 -137.4600      39.8       356       126        60
OIR    2025130    131400  -11.0200 -137.4700      39.8       356       126        60
OIR    2025130    131400  -11.0200 -137.4800      39.8       356       126        60
OIR    2025130    131400  -11.0200 -137.4900      39.8       356       126        60
OIR    2025130    131400  -11.0200 -137.5000      39.8       356       129        60
OIR    2025130    131400  -11.0200 -137.5100      39.8       356       133        60
OIR    2025130    131400  -11.0200 -137.5200      39.8       356       129        60
OIR    2025130    131400  -11.0200 -137.5300      39.8       356       125        60
OIR    2025130    131400  -11.0200 -137.5400      39.6       356       123        60
OIR    2025130    131400  -11.0200 -137.5500      39.2       355       122        60
OIR    2025130    131400  -11.0200 -137.5600      38.4       355       124        60
OIR    2025130    131400  -11.0200 -137.5700      37.6       354       127        60
OIR    2025130    131400  -11.0200 -137.5800      36.7       354       125        60
OIR    2025130    131400  -11.0200 -137.5900      36.0       353       125        60
OIR    2025130    131400  -11.0200 -137.6000      35.4       353       126        60
OIR    2025130    131400  -11.0200 -137.6100      34.7       353       126        60
OIR    2025130    131400  -11.0200 -137.6200      34.5       353       125        60
OIR    2025130    131400  -11.0200 -137.6300      34.3       352       125        60
OIR    2025130    131400  -11.0200 -137.6400      34.2       352       125        60
OIR    2025130    131400  -11.0200 -137.6500      33.9       352       125        60
OIR    2025130    131400  -11.0200 -137.6600      33.7       352       125        60
OIR    2025130    131400  -11.0200 -137.6700      33.5       351       125        60
OIR    2025130    131400  -11.0200 -137.6800      33.4       351       125        60
OIR    2025130    131400  -11.0200 -137.6900      33.3       351       127        60
OIR    2025130    131400  -11.0200 -137.7000      33.1       351       129        60
OIR    2025130    131400  -11.0200 -137.7100      32.7       351       130        60
OIR    2025130    131400  -11.0200 -137.7200      32.1       350       130        60
OIR    2025130    131400  -11.0200 -137.7300      31.3       350       130        60
OIR    2025130    131400  -11.0200 -137.7400      31.0       350       130        60
OIR    2025130    131400  -11.0200 -137.7500      30.7       350       131        60
OIR    2025130    131400  -11.0200 -137.7600      30.4       350       131        60
OIR    2025130    131400  -11.0200 -137.7700      29.9       350       131        60
OIR    2025130    131400  -11.0200 -137.7800      29.2       350       131        60
OIR    2025130    131400  -11.0200 -137.7900      28.5       350       131        60
OIR    2025130    131400  -11.0200 -137.8000      27.9       350       133        60
OIR    2025130    131400  -11.0200 -137.8100      27.7       350       133        60
OIR    2025130    131400  -11.0200 -137.8200      27.5       350       131        60
OIR    2025130    131400  -11.0200 -137.8300      27.3       350       130        60
OIR    2025130    131400  -11.0200 -137.8400      27.0       350       130        60
OIR    2025130    131400  -11.0200 -137.8500      26.8       350       133        60
OIR    2025130    131400  -11.0200 -137.8600      26.8       351       137        60
OIR    2025130    131400  -11.0200 -137.8700      26.9       351       139        60
OIR    2025130    131400  -11.0200 -137.8800      27.1       351       141        60
OIR    2025130    131400  -11.0200 -137.8900      27.2       351       141        60
OIR    2025130    131400  -11.0200 -137.9000      27.3       351       142        60
OIR    2025130    131400  -11.0200 -137.9100      27.3       351       140        60
OIR    2025130    131400  -11.0200 -137.9200      27.3       351       139        60
OIR    2025130    131400  -11.0200 -137.9300      27.3       351       139        60
OIR    2025130    131400  -11.0200 -137.9400      27.4       351       139        60
OIR    2025130    131400  -11.0200 -137.9500      27.4       351       139        60
OIR    2025130    131400  -11.0200 -137.9600      27.4       351       139        60
OIR    2025130    131400  -11.0200 -137.9700      27.4       351       139        60
OIR    2025130    131400  -11.0200 -137.9800      27.3       351       139        60
OIR    2025130    131400  -11.0200 -137.9900      27.3       351       140        60
OIR    2025130    131400  -11.0200 -138.0000      27.3       351       140        60
OIR    2025130    131400  -11.0200 -138.0100      27.3       351       139        60
OIR    2025130    131400  -11.0200 -138.0200      27.3       351       141        60
OIR    2025130    131400  -11.0200 -138.0300      27.3       351       142        60
OIR    2025130    131400  -11.0200 -138.0400      27.3       351       143        60
OIR    2025130    131400  -11.0200 -138.0500      27.3       351       144        60
OIR    2025130    131400  -11.0200 -138.0600      27.4       351       145        60
OIR    2025130    131400  -11.0200 -138.0700      27.4       351       144        60
OIR    2025130    131400  -11.0200 -138.0800      27.4       351       143        60
OIR    2025130    131400  -11.0200 -138.0900      27.4       351       143        60
OIR    2025130    131400  -11.0200 -138.1000      27.3       351       143        60
OIR    2025130    131400  -11.0200 -138.1100      27.3       352       142        60
OIR    2025130    131400  -11.0200 -138.1200      27.3       352       142        60
OIR    2025130    131400  -11.0200 -138.1300      27.3       352       145        60
OIR    2025130    131400  -11.0200 -138.1400      27.3       352       146        60
OIR    2025130    131400  -11.0200 -138.1500      27.2       352       145        60
OIR    2025130    131400  -11.0200 -138.1600      27.2       353       145        60
OIR    2025130    131400  -11.0200 -138.1700      27.1       353       145        60
OIR    2025130    131400  -11.0200 -138.1800      27.1       353       145        60
OIR    2025130    131400  -11.0200 -138.1900      27.1       354       145        60
OIR    2025130    131400  -11.0200 -138.2000      27.0       354       146        60
OIR    2025130    131400  -11.0200 -138.2100      27.0       354       147        60
OIR    2025130    131400  -11.0200 -138.2200      27.0       355       145        60
OIR    2025130    131400  -11.0200 -138.2300      27.0       355       144        60
OIR    2025130    131400  -11.0200 -138.2400      26.9       356       144        60
OIR    2025130    131400  -11.0200 -138.2500      26.9       357       144        60
OIR    2025130    131400  -11.0200 -138.2600      27.0       358       144        60
OIR    2025130    131400  -11.0200 -138.2700      27.0       358       144        60
OIR    2025130    131400  -11.0200 -138.2800      27.0       358       146        60
OIR    2025130    131400  -11.0200 -138.2900      27.0       358       147        60
OIR    2025130    131400  -11.0200 -138.3000      27.0       358       147        60
OIR    2025130    131400  -11.0300 -136.6400      40.3        18       149        60
OIR    2025130    131400  -11.0300 -136.6500      40.3        18       145        60
OIR    2025130    131400  -11.0300 -136.6600      40.2        18       141        60
OIR    2025130    131400  -11.0300 -136.6700      40.2        18       138        60
OIR    2025130    131400  -11.0300 -136.6800      40.3        18       136        60
OIR    2025130    131400  -11.0300 -136.6900      40.2        19       134        60
OIR    2025130    131400  -11.0300 -136.7000      40.2        19       132        60
OIR    2025130    131400  -11.0300 -136.7100      40.2        19       132        60
OIR    2025130    131400  -11.0300 -136.7200      40.3        19       133        60
OIR    2025130    131400  -11.0300 -136.7300      40.3        19       134        60
OIR    2025130    131400  -11.0300 -136.7400      40.3        19       136        60
OIR    2025130    131400  -11.0300 -136.7500      40.3        19       137        60
OIR    2025130    131400  -11.0300 -136.7600      40.3        19       139        60
OIR    2025130    131400  -11.0300 -136.7700      40.4        19       141        60
OIR    2025130    131400  -11.0300 -136.7800      40.4        18       142        60
OIR    2025130    131400  -11.0300 -136.7900      40.4        18       142        60
OIR    2025130    131400  -11.0300 -136.8000      40.4        18       142        60
OIR    2025130    131400  -11.0300 -136.8100      40.5        18       141        60
OIR    2025130    131400  -11.0300 -136.8200      40.5        18       144        60
OIR    2025130    131400  -11.0300 -136.8300      40.5        18       146        60
OIR    2025130    131400  -11.0300 -136.8400      40.6        18       147        60
OIR    2025130    131400  -11.0300 -136.8500      40.6        18       147        60
OIR    2025130    131400  -11.0300 -136.8600      40.6        18       146        60
OIR    2025130    131400  -11.0300 -136.8700      40.6        18       146        60
OIR    2025130    131400  -11.0300 -136.8800      40.6        18       144        60
OIR    2025130    131400  -11.0300 -136.8900      40.5        18       144        60
OIR    2025130    131400  -11.0300 -136.9000      40.5        18       144        60
OIR    2025130    131400  -11.0300 -136.9100      40.5        18       144        60
OIR    2025130    131400  -11.0300 -136.9200      40.5        18       144        60
OIR    2025130    131400  -11.0300 -136.9300      40.4        18       144        60
OIR    2025130    131400  -11.0300 -136.9400      40.3        17       144        60
OIR    2025130    131400  -11.0300 -136.9500      40.0        17       146        60
OIR    2025130    131400  -11.0300 -136.9600      39.9        16       148        60
OIR    2025130    131400  -11.0300 -136.9700      39.8        16       145        60
OIR    2025130    131400  -11.0300 -136.9800      39.6        15       143        60
OIR    2025130    131400  -11.0300 -136.9900      39.4        15       143        60
OIR    2025130    131400  -11.0300 -137.0000      39.2        14       142        60
OIR    2025130    131400  -11.0300 -137.0100      39.1        14       142        60
OIR    2025130    131400  -11.0300 -137.0200      39.0        14       142        60
OIR    2025130    131400  -11.0300 -137.0300      38.9        13       141        60
OIR    2025130    131400  -11.0300 -137.0400      38.9        13       143        60
OIR    2025130    131400  -11.0300 -137.0500      38.9        13       145        60
OIR    2025130    131400  -11.0300 -137.0600      38.9        13       143        60
OIR    2025130    131400  -11.0300 -137.0700      38.9        12       140        60
OIR    2025130    131400  -11.0300 -137.0800      38.9        12       140        60
OIR    2025130    131400  -11.0300 -137.0900      38.8        11       138        60
OIR    2025130    131400  -11.0300 -137.1000      38.9        11       136        60
OIR    2025130    131400  -11.0300 -137.1100      38.9        11       133        60
OIR    2025130    131400  -11.0300 -137.1200      38.9        10       132        60
OIR    2025130    131400  -11.0300 -137.1300      38.9        10       131        60
OIR    2025130    131400  -11.0300 -137.1400      38.9        10       130        60
OIR    2025130    131400  -11.0300 -137.1500      38.9        10       131        60
OIR    2025130    131400  -11.0300 -137.1600      38.9        10       132        60
OIR    2025130    131400  -11.0300 -137.1700      38.9        10       134        60
OIR    2025130    131400  -11.0300 -137.1800      39.0        10       136        60
OIR    2025130    131400  -11.0300 -137.1900      39.1         9       136        60
OIR    2025130    131400  -11.0300 -137.2000      39.2         9       135        60
OIR    2025130    131400  -11.0300 -137.2100      39.4         9       134        60
OIR    2025130    131400  -11.0300 -137.2200      39.5         8       132        60
OIR    2025130    131400  -11.0300 -137.2300      39.7         8       130        60
OIR    2025130    131400  -11.0300 -137.2400      39.7         7       129        60
OIR    2025130    131400  -11.0300 -137.2500      39.9         7       131        60
OIR    2025130    131400  -11.0300 -137.2600      40.0         6       130        60
OIR    2025130    131400  -11.0300 -137.2700      40.0         6       127        60
OIR    2025130    131400  -11.0300 -137.2800      40.0         6       125        60
OIR    2025130    131400  -11.0300 -137.2900      40.0         6       124        60
OIR    2025130    131400  -11.0300 -137.3000      39.9         5       122        60
OIR    2025130    131400  -11.0300 -137.3100      39.9         5       120        60
OIR    2025130    131400  -11.0300 -137.3200      39.9         4       119        60
OIR    2025130    131400  -11.0300 -137.3300      39.8         3       119        60
OIR    2025130    131400  -11.0300 -137.3400      39.7         3       120        60
OIR    2025130    131400  -11.0300 -137.3500      39.5         2       122        60
OIR    2025130    131400  -11.0300 -137.3600      39.4         2       125        60
OIR    2025130    131400  -11.0300 -137.3700      39.1         1       126        60
OIR    2025130    131400  -11.0300 -137.3800      38.9       360       126        60
OIR    2025130    131400  -11.0300 -137.3900      38.9       359       125        60
OIR    2025130    131400  -11.0300 -137.4000      38.9       359       125        60
OIR    2025130    131400  -11.0300 -137.4100      38.9       359       126        60
OIR    2025130    131400  -11.0300 -137.4200      39.0       359       126        60
OIR    2025130    131400  -11.0300 -137.4300      39.0       358       126        60
OIR    2025130    131400  -11.0300 -137.4400      39.2       358       127        60
OIR    2025130    131400  -11.0300 -137.4500      39.4       357       126        60
OIR    2025130    131400  -11.0300 -137.4600      39.8       356       126        60
OIR    2025130    131400  -11.0300 -137.4700      39.8       356       126        60
OIR    2025130    131400  -11.0300 -137.4800      39.8       356       126        60
OIR    2025130    131400  -11.0300 -137.4900      39.8       356       127        60
OIR    2025130    131400  -11.0300 -137.5000      39.8       356       129        60
OIR    2025130    131400  -11.0300 -137.5100      39.8       356       132        60
OIR    2025130    131400  -11.0300 -137.5200      39.8       356       130        60
OIR    2025130    131400  -11.0300 -137.5300      39.8       356       128        60
OIR    2025130    131400  -11.0300 -137.5400      39.8       356       126        60
OIR    2025130    131400  -11.0300 -137.5500      39.5       356       125        60
OIR    2025130    131400  -11.0300 -137.5600      39.1       355       127        60
OIR    2025130    131400  -11.0300 -137.5700      38.4       355       129        60
OIR    2025130    131400  -11.0300 -137.5800      37.6       355       128        60
OIR    2025130    131400  -11.0300 -137.5900      37.0       354       128        60
OIR    2025130    131400  -11.0300 -137.6000      36.4       353       130        60
OIR    2025130    131400  -11.0300 -137.6100      35.8       353       130        60
OIR    2025130    131400  -11.0300 -137.6200      35.3       353       130        60
OIR    2025130    131400  -11.0300 -137.6300      34.8       352       130        60
OIR    2025130    131400  -11.0300 -137.6400      34.4       352       130        60
OIR    2025130    131400  -11.0300 -137.6500      34.0       352       129        60
OIR    2025130    131400  -11.0300 -137.6600      33.7       351       129        60
OIR    2025130    131400  -11.0300 -137.6700      33.5       351       129        60
OIR    2025130    131400  -11.0300 -137.6800      33.4       351       129        60
OIR    2025130    131400  -11.0300 -137.6900      33.2       351       130        60
OIR    2025130    131400  -11.0300 -137.7000      32.8       351       131        60
OIR    2025130    131400  -11.0300 -137.7100      32.3       350       131        60
OIR    2025130    131400  -11.0300 -137.7200      31.8       350       130        60
OIR    2025130    131400  -11.0300 -137.7300      31.2       350       130        60
OIR    2025130    131400  -11.0300 -137.7400      30.9       350       130        60
OIR    2025130    131400  -11.0300 -137.7500      30.6       350       130        60
OIR    2025130    131400  -11.0300 -137.7600      30.4       350       131        60
OIR    2025130    131400  -11.0300 -137.7700      30.0       350       131        60
OIR    2025130    131400  -11.0300 -137.7800      29.4       350       131        60
OIR    2025130    131400  -11.0300 -137.7900      28.7       350       131        60
OIR    2025130    131400  -11.0300 -137.8000      28.0       350       132        60
OIR    2025130    131400  -11.0300 -137.8100      27.7       350       132        60
OIR    2025130    131400  -11.0300 -137.8200      27.6       350       130        60
OIR    2025130    131400  -11.0300 -137.8300      27.6       350       130        60
OIR    2025130    131400  -11.0300 -137.8400      27.5       350       130        60
OIR    2025130    131400  -11.0300 -137.8500      27.4       350       133        60
OIR    2025130    131400  -11.0300 -137.8600      27.4       350       138        60
OIR    2025130    131400  -11.0300 -137.8700      27.4       350       140        60
OIR    2025130    131400  -11.0300 -137.8800      27.4       350       141        60
OIR    2025130    131400  -11.0300 -137.8900      27.4       351       141        60
OIR    2025130    131400  -11.0300 -137.9000      27.4       351       141        60
OIR    2025130    131400  -11.0300 -137.9100      27.4       351       139        60
OIR    2025130    131400  -11.0300 -137.9200      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9300      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9400      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9500      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9600      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9700      27.4       351       138        60
OIR    2025130    131400  -11.0300 -137.9800      27.4       351       139        60
OIR    2025130    131400  -11.0300 -137.9900      27.4       351       139        60
OIR    2025130    131400  -11.0300 -138.0000      27.4       351       139        60
OIR    2025130    131400  -11.0300 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0300 -138.0200      27.4       351       140        60
OIR    2025130    131400  -11.0300 -138.0300      27.4       351       140        60
OIR    2025130    131400  -11.0300 -138.0400      27.4       351       141        60
OIR    2025130    131400  -11.0300 -138.0500      27.4       351       142        60
OIR    2025130    131400  -11.0300 -138.0600      27.4       351       142        60
OIR    2025130    131400  -11.0300 -138.0700      27.4       351       142        60
OIR    2025130    131400  -11.0300 -138.0800      27.4       351       142        60
OIR    2025130    131400  -11.0300 -138.0900      27.4       351       142        60
OIR    2025130    131400  -11.0300 -138.1000      27.4       351       141        60
OIR    2025130    131400  -11.0300 -138.1100      27.4       351       141        60
OIR    2025130    131400  -11.0300 -138.1200      27.4       352       141        60
OIR    2025130    131400  -11.0300 -138.1300      27.3       352       143        60
OIR    2025130    131400  -11.0300 -138.1400      27.3       352       144        60
OIR    2025130    131400  -11.0300 -138.1500      27.3       352       144        60
OIR    2025130    131400  -11.0300 -138.1600      27.3       352       143        60
OIR    2025130    131400  -11.0300 -138.1700      27.3       353       144        60
OIR    2025130    131400  -11.0300 -138.1800      27.2       353       144        60
OIR    2025130    131400  -11.0300 -138.1900      27.2       353       143        60
OIR    2025130    131400  -11.0300 -138.2000      27.2       354       144        60
OIR    2025130    131400  -11.0300 -138.2100      27.2       354       146        60
OIR    2025130    131400  -11.0300 -138.2200      27.2       354       145        60
OIR    2025130    131400  -11.0300 -138.2300      27.2       355       143        60
OIR    2025130    131400  -11.0300 -138.2400      27.1       355       143        60
OIR    2025130    131400  -11.0300 -138.2500      27.1       356       143        60
OIR    2025130    131400  -11.0300 -138.2600      27.1       357       142        60
OIR    2025130    131400  -11.0300 -138.2700      27.0       358       142        60
OIR    2025130    131400  -11.0300 -138.2800      27.0       358       143        60
OIR    2025130    131400  -11.0300 -138.2900      27.0       358       144        60
OIR    2025130    131400  -11.0300 -138.3000      27.0       358       145        60
OIR    2025130    131400  -11.0300 -138.3100      26.9       358       148        60
OIR    2025130    131400  -11.0400 -136.6400      40.2        18       149        60
OIR    2025130    131400  -11.0400 -136.6500      40.1        18       145        60
OIR    2025130    131400  -11.0400 -136.6600      40.1        18       142        60
OIR    2025130    131400  -11.0400 -136.6700      40.1        18       139        60
OIR    2025130    131400  -11.0400 -136.6800      40.1        18       137        60
OIR    2025130    131400  -11.0400 -136.6900      40.1        19       135        60
OIR    2025130    131400  -11.0400 -136.7000      40.1        19       133        60
OIR    2025130    131400  -11.0400 -136.7100      40.1        19       134        60
OIR    2025130    131400  -11.0400 -136.7200      40.2        19       135        60
OIR    2025130    131400  -11.0400 -136.7300      40.2        19       136        60
OIR    2025130    131400  -11.0400 -136.7400      40.2        19       137        60
OIR    2025130    131400  -11.0400 -136.7500      40.3        19       138        60
OIR    2025130    131400  -11.0400 -136.7600      40.3        19       139        60
OIR    2025130    131400  -11.0400 -136.7700      40.3        18       141        60
OIR    2025130    131400  -11.0400 -136.7800      40.3        18       142        60
OIR    2025130    131400  -11.0400 -136.7900      40.4        18       143        60
OIR    2025130    131400  -11.0400 -136.8000      40.4        18       143        60
OIR    2025130    131400  -11.0400 -136.8100      40.4        18       143        60
OIR    2025130    131400  -11.0400 -136.8200      40.5        18       143        60
OIR    2025130    131400  -11.0400 -136.8300      40.5        18       144        60
OIR    2025130    131400  -11.0400 -136.8400      40.5        18       145        60
OIR    2025130    131400  -11.0400 -136.8500      40.6        18       145        60
OIR    2025130    131400  -11.0400 -136.8600      40.6        18       145        60
OIR    2025130    131400  -11.0400 -136.8700      40.6        18       144        60
OIR    2025130    131400  -11.0400 -136.8800      40.5        18       142        60
OIR    2025130    131400  -11.0400 -136.8900      40.5        18       142        60
OIR    2025130    131400  -11.0400 -136.9000      40.5        18       143        60
OIR    2025130    131400  -11.0400 -136.9100      40.5        18       143        60
OIR    2025130    131400  -11.0400 -136.9200      40.5        18       142        60
OIR    2025130    131400  -11.0400 -136.9300      40.4        18       143        60
OIR    2025130    131400  -11.0400 -136.9400      40.3        17       143        60
OIR    2025130    131400  -11.0400 -136.9500      40.0        17       144        60
OIR    2025130    131400  -11.0400 -136.9600      39.9        16       144        60
OIR    2025130    131400  -11.0400 -136.9700      39.7        16       142        60
OIR    2025130    131400  -11.0400 -136.9800      39.5        15       141        60
OIR    2025130    131400  -11.0400 -136.9900      39.3        15       141        60
OIR    2025130    131400  -11.0400 -137.0000      39.1        14       141        60
OIR    2025130    131400  -11.0400 -137.0100      38.9        14       141        60
OIR    2025130    131400  -11.0400 -137.0200      38.8        14       141        60
OIR    2025130    131400  -11.0400 -137.0300      38.8        13       141        60
OIR    2025130    131400  -11.0400 -137.0400      38.7        13       142        60
OIR    2025130    131400  -11.0400 -137.0500      38.7        13       143        60
OIR    2025130    131400  -11.0400 -137.0600      38.7        12       141        60
OIR    2025130    131400  -11.0400 -137.0700      38.7        12       138        60
OIR    2025130    131400  -11.0400 -137.0800      38.8        12       139        60
OIR    2025130    131400  -11.0400 -137.0900      38.8        11       138        60
OIR    2025130    131400  -11.0400 -137.1000      38.8        11       136        60
OIR    2025130    131400  -11.0400 -137.1100      38.8        11       134        60
OIR    2025130    131400  -11.0400 -137.1200      38.8        10       134        60
OIR    2025130    131400  -11.0400 -137.1300      38.8        10       134        60
OIR    2025130    131400  -11.0400 -137.1400      38.8        10       133        60
OIR    2025130    131400  -11.0400 -137.1500      38.8        10       134        60
OIR    2025130    131400  -11.0400 -137.1600      38.8        10       136        60
OIR    2025130    131400  -11.0400 -137.1700      38.8        10       137        60
OIR    2025130    131400  -11.0400 -137.1800      38.9        10       138        60
OIR    2025130    131400  -11.0400 -137.1900      39.0         9       136        60
OIR    2025130    131400  -11.0400 -137.2000      39.2         9       136        60
OIR    2025130    131400  -11.0400 -137.2100      39.3         8       135        60
OIR    2025130    131400  -11.0400 -137.2200      39.5         8       134        60
OIR    2025130    131400  -11.0400 -137.2300      39.7         8       131        60
OIR    2025130    131400  -11.0400 -137.2400      39.9         7       130        60
OIR    2025130    131400  -11.0400 -137.2500      40.1         7       130        60
OIR    2025130    131400  -11.0400 -137.2600      40.3         6       128        60
OIR    2025130    131400  -11.0400 -137.2700      40.4         6       126        60
OIR    2025130    131400  -11.0400 -137.2800      40.5         6       124        60
OIR    2025130    131400  -11.0400 -137.2900      40.6         5       124        60
OIR    2025130    131400  -11.0400 -137.3000      40.6         5       122        60
OIR    2025130    131400  -11.0400 -137.3100      40.6         4       120        60
OIR    2025130    131400  -11.0400 -137.3200      40.6         4       119        60
OIR    2025130    131400  -11.0400 -137.3300      40.5         3       119        60
OIR    2025130    131400  -11.0400 -137.3400      40.4         3       119        60
OIR    2025130    131400  -11.0400 -137.3500      40.1         2       120        60
OIR    2025130    131400  -11.0400 -137.3600      39.7         2       122        60
OIR    2025130    131400  -11.0400 -137.3700      39.3         1       124        60
OIR    2025130    131400  -11.0400 -137.3800      39.0       360       123        60
OIR    2025130    131400  -11.0400 -137.3900      38.9       359       124        60
OIR    2025130    131400  -11.0400 -137.4000      38.9       359       124        60
OIR    2025130    131400  -11.0400 -137.4100      38.9       359       125        60
OIR    2025130    131400  -11.0400 -137.4200      39.0       358       125        60
OIR    2025130    131400  -11.0400 -137.4300      39.1       358       126        60
OIR    2025130    131400  -11.0400 -137.4400      39.3       358       127        60
OIR    2025130    131400  -11.0400 -137.4500      39.5       357       126        60
OIR    2025130    131400  -11.0400 -137.4600      39.8       356       127        60
OIR    2025130    131400  -11.0400 -137.4700      39.8       356       128        60
OIR    2025130    131400  -11.0400 -137.4800      39.8       356       129        60
OIR    2025130    131400  -11.0400 -137.4900      39.8       356       130        60
OIR    2025130    131400  -11.0400 -137.5000      39.8       356       132        60
OIR    2025130    131400  -11.0400 -137.5100      39.8       356       134        60
OIR    2025130    131400  -11.0400 -137.5200      39.8       356       133        60
OIR    2025130    131400  -11.0400 -137.5300      39.8       356       133        60
OIR    2025130    131400  -11.0400 -137.5400      39.8       356       131        60
OIR    2025130    131400  -11.0400 -137.5500      39.7       356       131        60
OIR    2025130    131400  -11.0400 -137.5600      39.5       356       132        60
OIR    2025130    131400  -11.0400 -137.5700      38.9       355       132        60
OIR    2025130    131400  -11.0400 -137.5800      38.1       355       132        60
OIR    2025130    131400  -11.0400 -137.5900      37.5       354       133        60
OIR    2025130    131400  -11.0400 -137.6000      36.9       354       133        60
OIR    2025130    131400  -11.0400 -137.6100      36.5       353       134        60
OIR    2025130    131400  -11.0400 -137.6200      35.8       353       135        60
OIR    2025130    131400  -11.0400 -137.6300      35.2       353       135        60
OIR    2025130    131400  -11.0400 -137.6400      34.6       352       135        60
OIR    2025130    131400  -11.0400 -137.6500      34.2       352       134        60
OIR    2025130    131400  -11.0400 -137.6600      33.8       351       133        60
OIR    2025130    131400  -11.0400 -137.6700      33.5       351       133        60
OIR    2025130    131400  -11.0400 -137.6800      33.3       351       134        60
OIR    2025130    131400  -11.0400 -137.6900      33.0       351       133        60
OIR    2025130    131400  -11.0400 -137.7000      32.6       351       133        60
OIR    2025130    131400  -11.0400 -137.7100      32.0       350       132        60
OIR    2025130    131400  -11.0400 -137.7200      31.5       350       130        60
OIR    2025130    131400  -11.0400 -137.7300      31.0       350       129        60
OIR    2025130    131400  -11.0400 -137.7400      30.7       350       128        60
OIR    2025130    131400  -11.0400 -137.7500      30.5       350       128        60
OIR    2025130    131400  -11.0400 -137.7600      30.3       350       129        60
OIR    2025130    131400  -11.0400 -137.7700      30.0       350       129        60
OIR    2025130    131400  -11.0400 -137.7800      29.4       350       130        60
OIR    2025130    131400  -11.0400 -137.7900      28.8       350       130        60
OIR    2025130    131400  -11.0400 -137.8000      28.1       350       131        60
OIR    2025130    131400  -11.0400 -137.8100      27.7       350       131        60
OIR    2025130    131400  -11.0400 -137.8200      27.6       350       131        60
OIR    2025130    131400  -11.0400 -137.8300      27.6       350       131        60
OIR    2025130    131400  -11.0400 -137.8400      27.6       350       132        60
OIR    2025130    131400  -11.0400 -137.8500      27.5       350       134        60
OIR    2025130    131400  -11.0400 -137.8600      27.5       350       137        60
OIR    2025130    131400  -11.0400 -137.8700      27.5       350       139        60
OIR    2025130    131400  -11.0400 -137.8800      27.5       350       139        60
OIR    2025130    131400  -11.0400 -137.8900      27.4       351       139        60
OIR    2025130    131400  -11.0400 -137.9000      27.4       351       139        60
OIR    2025130    131400  -11.0400 -137.9100      27.4       351       137        60
OIR    2025130    131400  -11.0400 -137.9200      27.4       351       137        60
OIR    2025130    131400  -11.0400 -137.9300      27.4       351       138        60
OIR    2025130    131400  -11.0400 -137.9400      27.4       351       139        60
OIR    2025130    131400  -11.0400 -137.9500      27.4       351       139        60
OIR    2025130    131400  -11.0400 -137.9600      27.4       351       138        60
OIR    2025130    131400  -11.0400 -137.9700      27.4       351       138        60
OIR    2025130    131400  -11.0400 -137.9800      27.4       351       137        60
OIR    2025130    131400  -11.0400 -137.9900      27.4       351       137        60
OIR    2025130    131400  -11.0400 -138.0000      27.4       351       138        60
OIR    2025130    131400  -11.0400 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0400 -138.0200      27.4       351       139        60
OIR    2025130    131400  -11.0400 -138.0300      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.0400      27.4       351       141        60
OIR    2025130    131400  -11.0400 -138.0500      27.4       351       141        60
OIR    2025130    131400  -11.0400 -138.0600      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.0700      27.4       351       139        60
OIR    2025130    131400  -11.0400 -138.0800      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.0900      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.1000      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.1100      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.1200      27.4       351       140        60
OIR    2025130    131400  -11.0400 -138.1300      27.4       352       141        60
OIR    2025130    131400  -11.0400 -138.1400      27.4       352       142        60
OIR    2025130    131400  -11.0400 -138.1500      27.4       352       142        60
OIR    2025130    131400  -11.0400 -138.1600      27.4       352       143        60
OIR    2025130    131400  -11.0400 -138.1700      27.4       352       142        60
OIR    2025130    131400  -11.0400 -138.1800      27.3       352       141        60
OIR    2025130    131400  -11.0400 -138.1900      27.3       353       140        60
OIR    2025130    131400  -11.0400 -138.2000      27.3       353       141        60
OIR    2025130    131400  -11.0400 -138.2100      27.3       353       141        60
OIR    2025130    131400  -11.0400 -138.2200      27.3       354       142        60
OIR    2025130    131400  -11.0400 -138.2300      27.3       354       144        60
OIR    2025130    131400  -11.0400 -138.2400      27.3       355       142        60
OIR    2025130    131400  -11.0400 -138.2500      27.2       356       141        60
OIR    2025130    131400  -11.0400 -138.2600      27.1       357       141        60
OIR    2025130    131400  -11.0400 -138.2700      27.1       357       141        60
OIR    2025130    131400  -11.0400 -138.2800      27.0       358       141        60
OIR    2025130    131400  -11.0400 -138.2900      27.0       358       142        60
OIR    2025130    131400  -11.0400 -138.3000      27.0       358       142        60
OIR    2025130    131400  -11.0400 -138.3100      26.9       358       143        60
OIR    2025130    131400  -11.0400 -138.3200      26.8       359       143        60
OIR    2025130    131400  -11.0400 -138.3300      26.8       359       144        60
OIR    2025130    131400  -11.0400 -138.3400      26.7       359       146        60
OIR    2025130    131400  -11.0400 -138.3500      26.6       359       146        60
OIR    2025130    131400  -11.0400 -138.3600      26.5       360       146        60
OIR    2025130    131400  -11.0400 -138.3700      26.3         0       147        60
OIR    2025130    131400  -11.0400 -138.3800      26.1         1       148        60
OIR    2025130    131400  -11.0500 -135.3500      19.8        14       138        60
OIR    2025130    131400  -11.0500 -135.3600      20.4        15       138        60
OIR    2025130    131400  -11.0500 -136.6400      40.1        18       149        60
OIR    2025130    131400  -11.0500 -136.6500      40.0        18       146        60
OIR    2025130    131400  -11.0500 -136.6600      40.0        18       144        60
OIR    2025130    131400  -11.0500 -136.6700      40.0        18       141        60
OIR    2025130    131400  -11.0500 -136.6800      40.0        18       138        60
OIR    2025130    131400  -11.0500 -136.6900      40.0        18       136        60
OIR    2025130    131400  -11.0500 -136.7000      40.0        19       134        60
OIR    2025130    131400  -11.0500 -136.7100      40.0        19       135        60
OIR    2025130    131400  -11.0500 -136.7200      40.0        19       137        60
OIR    2025130    131400  -11.0500 -136.7300      40.1        19       137        60
OIR    2025130    131400  -11.0500 -136.7400      40.1        19       138        60
OIR    2025130    131400  -11.0500 -136.7500      40.2        19       139        60
OIR    2025130    131400  -11.0500 -136.7600      40.2        19       140        60
OIR    2025130    131400  -11.0500 -136.7700      40.2        18       142        60
OIR    2025130    131400  -11.0500 -136.7800      40.3        18       143        60
OIR    2025130    131400  -11.0500 -136.7900      40.3        18       144        60
OIR    2025130    131400  -11.0500 -136.8000      40.4        18       144        60
OIR    2025130    131400  -11.0500 -136.8100      40.4        18       145        60
OIR    2025130    131400  -11.0500 -136.8200      40.4        18       143        60
OIR    2025130    131400  -11.0500 -136.8300      40.5        18       142        60
OIR    2025130    131400  -11.0500 -136.8400      40.5        18       143        60
OIR    2025130    131400  -11.0500 -136.8500      40.5        18       144        60
OIR    2025130    131400  -11.0500 -136.8600      40.5        18       143        60
OIR    2025130    131400  -11.0500 -136.8700      40.5        18       142        60
OIR    2025130    131400  -11.0500 -136.8800      40.5        18       141        60
OIR    2025130    131400  -11.0500 -136.8900      40.5        18       141        60
OIR    2025130    131400  -11.0500 -136.9000      40.5        18       142        60
OIR    2025130    131400  -11.0500 -136.9100      40.5        18       143        60
OIR    2025130    131400  -11.0500 -136.9200      40.5        18       142        60
OIR    2025130    131400  -11.0500 -136.9300      40.5        18       142        60
OIR    2025130    131400  -11.0500 -136.9400      40.4        18       142        60
OIR    2025130    131400  -11.0500 -136.9500      40.1        17       142        60
OIR    2025130    131400  -11.0500 -136.9600      39.9        16       142        60
OIR    2025130    131400  -11.0500 -136.9700      39.7        16       141        60
OIR    2025130    131400  -11.0500 -136.9800      39.5        15       140        60
OIR    2025130    131400  -11.0500 -136.9900      39.2        15       140        60
OIR    2025130    131400  -11.0500 -137.0000      39.0        14       141        60
OIR    2025130    131400  -11.0500 -137.0100      38.8        14       141        60
OIR    2025130    131400  -11.0500 -137.0200      38.7        13       141        60
OIR    2025130    131400  -11.0500 -137.0300      38.7        13       141        60
OIR    2025130    131400  -11.0500 -137.0400      38.6        13       141        60
OIR    2025130    131400  -11.0500 -137.0500      38.6        13       141        60
OIR    2025130    131400  -11.0500 -137.0600      38.6        12       140        60
OIR    2025130    131400  -11.0500 -137.0700      38.6        12       137        60
OIR    2025130    131400  -11.0500 -137.0800      38.6        12       139        60
OIR    2025130    131400  -11.0500 -137.0900      38.7        11       139        60
OIR    2025130    131400  -11.0500 -137.1000      38.7        11       138        60
OIR    2025130    131400  -11.0500 -137.1100      38.7        11       137        60
OIR    2025130    131400  -11.0500 -137.1200      38.7        10       137        60
OIR    2025130    131400  -11.0500 -137.1300      38.7        10       137        60
OIR    2025130    131400  -11.0500 -137.1400      38.7        10       136        60
OIR    2025130    131400  -11.0500 -137.1500      38.7        10       137        60
OIR    2025130    131400  -11.0500 -137.1600      38.8        10       139        60
OIR    2025130    131400  -11.0500 -137.1700      38.8        10       140        60
OIR    2025130    131400  -11.0500 -137.1800      38.9         9       141        60
OIR    2025130    131400  -11.0500 -137.1900      39.1         9       139        60
OIR    2025130    131400  -11.0500 -137.2000      39.2         9       137        60
OIR    2025130    131400  -11.0500 -137.2100      39.3         8       136        60
OIR    2025130    131400  -11.0500 -137.2200      39.5         8       135        60
OIR    2025130    131400  -11.0500 -137.2300      39.7         7       132        60
OIR    2025130    131400  -11.0500 -137.2400      39.9         7       131        60
OIR    2025130    131400  -11.0500 -137.2500      40.2         7       131        60
OIR    2025130    131400  -11.0500 -137.2600      40.5         6       129        60
OIR    2025130    131400  -11.0500 -137.2700      40.7         6       127        60
OIR    2025130    131400  -11.0500 -137.2800      40.8         5       125        60
OIR    2025130    131400  -11.0500 -137.2900      40.8         5       124        60
OIR    2025130    131400  -11.0500 -137.3000      40.8         5       122        60
OIR    2025130    131400  -11.0500 -137.3100      40.8         4       121        60
OIR    2025130    131400  -11.0500 -137.3200      40.7         4       120        60
OIR    2025130    131400  -11.0500 -137.3300      40.6         3       119        60
OIR    2025130    131400  -11.0500 -137.3400      40.5         3       119        60
OIR    2025130    131400  -11.0500 -137.3500      40.3         2       120        60
OIR    2025130    131400  -11.0500 -137.3600      40.0         1       121        60
OIR    2025130    131400  -11.0500 -137.3700      39.4         0       123        60
OIR    2025130    131400  -11.0500 -137.3800      39.1       359       123        60
OIR    2025130    131400  -11.0500 -137.3900      39.0       359       124        60
OIR    2025130    131400  -11.0500 -137.4000      39.1       359       124        60
OIR    2025130    131400  -11.0500 -137.4100      39.1       358       124        60
OIR    2025130    131400  -11.0500 -137.4200      39.2       358       125        60
OIR    2025130    131400  -11.0500 -137.4300      39.4       358       126        60
OIR    2025130    131400  -11.0500 -137.4400      39.5       357       127        60
OIR    2025130    131400  -11.0500 -137.4500      39.7       357       127        60
OIR    2025130    131400  -11.0500 -137.4600      39.8       356       128        60
OIR    2025130    131400  -11.0500 -137.4700      39.8       356       129        60
OIR    2025130    131400  -11.0500 -137.4800      39.9       356       130        60
OIR    2025130    131400  -11.0500 -137.4900      39.9       356       132        60
OIR    2025130    131400  -11.0500 -137.5000      39.8       356       133        60
OIR    2025130    131400  -11.0500 -137.5100      39.8       356       135        60
OIR    2025130    131400  -11.0500 -137.5200      39.8       356       135        60
OIR    2025130    131400  -11.0500 -137.5300      39.8       356       135        60
OIR    2025130    131400  -11.0500 -137.5400      39.8       356       135        60
OIR    2025130    131400  -11.0500 -137.5500      39.8       356       135        60
OIR    2025130    131400  -11.0500 -137.5600      39.7       356       135        60
OIR    2025130    131400  -11.0500 -137.5700      39.3       356       136        60
OIR    2025130    131400  -11.0500 -137.5800      38.5       355       137        60
OIR    2025130    131400  -11.0500 -137.5900      38.0       355       137        60
OIR    2025130    131400  -11.0500 -137.6000      37.3       354       137        60
OIR    2025130    131400  -11.0500 -137.6100      36.8       354       137        60
OIR    2025130    131400  -11.0500 -137.6200      36.1       353       139        60
OIR    2025130    131400  -11.0500 -137.6300      35.5       353       139        60
OIR    2025130    131400  -11.0500 -137.6400      34.8       352       138        60
OIR    2025130    131400  -11.0500 -137.6500      34.2       352       137        60
OIR    2025130    131400  -11.0500 -137.6600      33.7       351       136        60
OIR    2025130    131400  -11.0500 -137.6700      33.4       351       136        60
OIR    2025130    131400  -11.0500 -137.6800      33.1       351       136        60
OIR    2025130    131400  -11.0500 -137.6900      32.8       351       135        60
OIR    2025130    131400  -11.0500 -137.7000      32.4       350       134        60
OIR    2025130    131400  -11.0500 -137.7100      31.9       350       133        60
OIR    2025130    131400  -11.0500 -137.7200      31.4       350       132        60
OIR    2025130    131400  -11.0500 -137.7300      31.0       350       130        60
OIR    2025130    131400  -11.0500 -137.7400      30.7       350       129        60
OIR    2025130    131400  -11.0500 -137.7500      30.5       350       127        60
OIR    2025130    131400  -11.0500 -137.7600      30.2       350       128        60
OIR    2025130    131400  -11.0500 -137.7700      29.9       350       128        60
OIR    2025130    131400  -11.0500 -137.7800      29.3       350       129        60
OIR    2025130    131400  -11.0500 -137.7900      28.7       350       130        60
OIR    2025130    131400  -11.0500 -137.8000      28.1       350       131        60
OIR    2025130    131400  -11.0500 -137.8100      27.7       350       131        60
OIR    2025130    131400  -11.0500 -137.8200      27.6       350       131        60
OIR    2025130    131400  -11.0500 -137.8300      27.6       350       131        60
OIR    2025130    131400  -11.0500 -137.8400      27.6       350       132        60
OIR    2025130    131400  -11.0500 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.0500 -137.8600      27.5       350       136        60
OIR    2025130    131400  -11.0500 -137.8700      27.5       350       136        60
OIR    2025130    131400  -11.0500 -137.8800      27.5       350       137        60
OIR    2025130    131400  -11.0500 -137.8900      27.5       350       137        60
OIR    2025130    131400  -11.0500 -137.9000      27.4       351       137        60
OIR    2025130    131400  -11.0500 -137.9100      27.4       351       136        60
OIR    2025130    131400  -11.0500 -137.9200      27.4       351       136        60
OIR    2025130    131400  -11.0500 -137.9300      27.4       351       138        60
OIR    2025130    131400  -11.0500 -137.9400      27.4       351       138        60
OIR    2025130    131400  -11.0500 -137.9500      27.4       351       138        60
OIR    2025130    131400  -11.0500 -137.9600      27.4       351       138        60
OIR    2025130    131400  -11.0500 -137.9700      27.4       351       137        60
OIR    2025130    131400  -11.0500 -137.9800      27.4       351       136        60
OIR    2025130    131400  -11.0500 -137.9900      27.4       351       135        60
OIR    2025130    131400  -11.0500 -138.0000      27.4       351       137        60
OIR    2025130    131400  -11.0500 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0200      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0300      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0400      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.0500      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0700      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0800      27.4       351       139        60
OIR    2025130    131400  -11.0500 -138.0900      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1000      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1100      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1200      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1300      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1400      27.4       351       140        60
OIR    2025130    131400  -11.0500 -138.1500      27.4       352       140        60
OIR    2025130    131400  -11.0500 -138.1600      27.4       352       140        60
OIR    2025130    131400  -11.0500 -138.1700      27.4       352       139        60
OIR    2025130    131400  -11.0500 -138.1800      27.4       352       139        60
OIR    2025130    131400  -11.0500 -138.1900      27.4       352       138        60
OIR    2025130    131400  -11.0500 -138.2000      27.3       353       138        60
OIR    2025130    131400  -11.0500 -138.2100      27.3       353       139        60
OIR    2025130    131400  -11.0500 -138.2200      27.4       354       140        60
OIR    2025130    131400  -11.0500 -138.2300      27.4       354       141        60
OIR    2025130    131400  -11.0500 -138.2400      27.3       355       140        60
OIR    2025130    131400  -11.0500 -138.2500      27.2       355       139        60
OIR    2025130    131400  -11.0500 -138.2600      27.2       356       140        60
OIR    2025130    131400  -11.0500 -138.2700      27.1       357       140        60
OIR    2025130    131400  -11.0500 -138.2800      27.0       357       141        60
OIR    2025130    131400  -11.0500 -138.2900      27.0       358       141        60
OIR    2025130    131400  -11.0500 -138.3000      26.9       358       142        60
OIR    2025130    131400  -11.0500 -138.3100      26.8       358       142        60
OIR    2025130    131400  -11.0500 -138.3200      26.8       358       142        60
OIR    2025130    131400  -11.0500 -138.3300      26.7       359       143        60
OIR    2025130    131400  -11.0500 -138.3400      26.7       359       144        60
OIR    2025130    131400  -11.0500 -138.3500      26.6       359       146        60
OIR    2025130    131400  -11.0500 -138.3600      26.4       360       148        60
OIR    2025130    131400  -11.0500 -138.3700      26.1         0       149        60
OIR    2025130    131400  -11.0600 -132.5100      13.7        26       124        60
OIR    2025130    131400  -11.0600 -136.6400      40.0        18       149        60
OIR    2025130    131400  -11.0600 -136.6500      40.0        18       147        60
OIR    2025130    131400  -11.0600 -136.6600      40.0        18       146        60
OIR    2025130    131400  -11.0600 -136.6700      40.0        18       142        60
OIR    2025130    131400  -11.0600 -136.6800      40.0        18       138        60
OIR    2025130    131400  -11.0600 -136.6900      40.0        18       136        60
OIR    2025130    131400  -11.0600 -136.7000      40.0        18       134        60
OIR    2025130    131400  -11.0600 -136.7100      40.0        18       137        60
OIR    2025130    131400  -11.0600 -136.7200      40.0        18       140        60
OIR    2025130    131400  -11.0600 -136.7300      40.0        18       140        60
OIR    2025130    131400  -11.0600 -136.7400      40.0        18       140        60
OIR    2025130    131400  -11.0600 -136.7500      40.1        18       141        60
OIR    2025130    131400  -11.0600 -136.7600      40.1        18       142        60
OIR    2025130    131400  -11.0600 -136.7700      40.2        18       143        60
OIR    2025130    131400  -11.0600 -136.7800      40.2        18       143        60
OIR    2025130    131400  -11.0600 -136.7900      40.3        18       144        60
OIR    2025130    131400  -11.0600 -136.8000      40.3        18       144        60
OIR    2025130    131400  -11.0600 -136.8100      40.4        18       145        60
OIR    2025130    131400  -11.0600 -136.8200      40.4        18       145        60
OIR    2025130    131400  -11.0600 -136.8300      40.5        18       143        60
OIR    2025130    131400  -11.0600 -136.8400      40.5        18       142        60
OIR    2025130    131400  -11.0600 -136.8500      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.8600      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.8700      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.8800      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.8900      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.9000      40.5        18       141        60
OIR    2025130    131400  -11.0600 -136.9100      40.5        18       142        60
OIR    2025130    131400  -11.0600 -136.9200      40.5        18       143        60
OIR    2025130    131400  -11.0600 -136.9300      40.5        18       143        60
OIR    2025130    131400  -11.0600 -136.9400      40.4        18       142        60
OIR    2025130    131400  -11.0600 -136.9500      40.1        17       142        60
OIR    2025130    131400  -11.0600 -136.9600      39.9        16       142        60
OIR    2025130    131400  -11.0600 -136.9700      39.7        16       141        60
OIR    2025130    131400  -11.0600 -136.9800      39.5        15       140        60
OIR    2025130    131400  -11.0600 -136.9900      39.0        14       140        60
OIR    2025130    131400  -11.0600 -137.0000      38.8        14       141        60
OIR    2025130    131400  -11.0600 -137.0100      38.7        14       141        60
OIR    2025130    131400  -11.0600 -137.0200      38.6        13       141        60
OIR    2025130    131400  -11.0600 -137.0300      38.5        13       141        60
OIR    2025130    131400  -11.0600 -137.0400      38.4        13       141        60
OIR    2025130    131400  -11.0600 -137.0500      38.4        13       140        60
OIR    2025130    131400  -11.0600 -137.0600      38.4        12       139        60
OIR    2025130    131400  -11.0600 -137.0700      38.4        12       137        60
OIR    2025130    131400  -11.0600 -137.0800      38.5        12       140        60
OIR    2025130    131400  -11.0600 -137.0900      38.5        11       141        60
OIR    2025130    131400  -11.0600 -137.1000      38.6        11       141        60
OIR    2025130    131400  -11.0600 -137.1100      38.6        11       141        60
OIR    2025130    131400  -11.0600 -137.1200      38.7        10       140        60
OIR    2025130    131400  -11.0600 -137.1300      38.7        10       140        60
OIR    2025130    131400  -11.0600 -137.1400      38.7        10       140        60
OIR    2025130    131400  -11.0600 -137.1500      38.7        10       140        60
OIR    2025130    131400  -11.0600 -137.1600      38.8        10       141        60
OIR    2025130    131400  -11.0600 -137.1700      38.8        10       144        60
OIR    2025130    131400  -11.0600 -137.1800      38.9         9       147        60
OIR    2025130    131400  -11.0600 -137.1900      39.0         9       142        60
OIR    2025130    131400  -11.0600 -137.2000      39.1         9       139        60
OIR    2025130    131400  -11.0600 -137.2100      39.3         8       137        60
OIR    2025130    131400  -11.0600 -137.2200      39.4         8       135        60
OIR    2025130    131400  -11.0600 -137.2300      39.7         7       133        60
OIR    2025130    131400  -11.0600 -137.2400      39.9         7       132        60
OIR    2025130    131400  -11.0600 -137.2500      40.3         7       133        60
OIR    2025130    131400  -11.0600 -137.2600      40.6         6       132        60
OIR    2025130    131400  -11.0600 -137.2700      40.8         6       130        60
OIR    2025130    131400  -11.0600 -137.2800      40.9         5       127        60
OIR    2025130    131400  -11.0600 -137.2900      40.9         5       125        60
OIR    2025130    131400  -11.0600 -137.3000      41.0         4       123        60
OIR    2025130    131400  -11.0600 -137.3100      40.9         4       122        60
OIR    2025130    131400  -11.0600 -137.3200      40.9         3       122        60
OIR    2025130    131400  -11.0600 -137.3300      40.8         3       121        60
OIR    2025130    131400  -11.0600 -137.3400      40.6         2       120        60
OIR    2025130    131400  -11.0600 -137.3500      40.4         2       121        60
OIR    2025130    131400  -11.0600 -137.3600      40.0         1       122        60
OIR    2025130    131400  -11.0600 -137.3700      39.5       360       123        60
OIR    2025130    131400  -11.0600 -137.3800      39.3       359       125        60
OIR    2025130    131400  -11.0600 -137.3900      39.2       359       125        60
OIR    2025130    131400  -11.0600 -137.4000      39.2       358       124        60
OIR    2025130    131400  -11.0600 -137.4100      39.3       358       124        60
OIR    2025130    131400  -11.0600 -137.4200      39.4       358       125        60
OIR    2025130    131400  -11.0600 -137.4300      39.5       357       127        60
OIR    2025130    131400  -11.0600 -137.4400      39.7       357       128        60
OIR    2025130    131400  -11.0600 -137.4500      39.8       356       129        60
OIR    2025130    131400  -11.0600 -137.4600      39.8       356       129        60
OIR    2025130    131400  -11.0600 -137.4700      39.8       356       130        60
OIR    2025130    131400  -11.0600 -137.4800      39.9       356       130        60
OIR    2025130    131400  -11.0600 -137.4900      39.9       356       132        60
OIR    2025130    131400  -11.0600 -137.5000      39.8       356       134        60
OIR    2025130    131400  -11.0600 -137.5100      39.8       356       135        60
OIR    2025130    131400  -11.0600 -137.5200      39.8       356       135        60
OIR    2025130    131400  -11.0600 -137.5300      39.8       356       134        60
OIR    2025130    131400  -11.0600 -137.5400      39.8       356       136        60
OIR    2025130    131400  -11.0600 -137.5500      39.8       356       138        60
OIR    2025130    131400  -11.0600 -137.5600      39.7       356       139        60
OIR    2025130    131400  -11.0600 -137.5700      39.5       356       139        60
OIR    2025130    131400  -11.0600 -137.5800      39.0       356       140        60
OIR    2025130    131400  -11.0600 -137.5900      38.4       355       141        60
OIR    2025130    131400  -11.0600 -137.6000      37.7       355       141        60
OIR    2025130    131400  -11.0600 -137.6100      37.1       354       141        60
OIR    2025130    131400  -11.0600 -137.6200      36.4       353       141        60
OIR    2025130    131400  -11.0600 -137.6300      35.8       353       140        60
OIR    2025130    131400  -11.0600 -137.6400      35.1       353       138        60
OIR    2025130    131400  -11.0600 -137.6500      34.4       352       138        60
OIR    2025130    131400  -11.0600 -137.6600      33.8       352       137        60
OIR    2025130    131400  -11.0600 -137.6700      33.4       351       137        60
OIR    2025130    131400  -11.0600 -137.6800      33.1       351       136        60
OIR    2025130    131400  -11.0600 -137.6900      32.6       351       135        60
OIR    2025130    131400  -11.0600 -137.7000      32.2       350       134        60
OIR    2025130    131400  -11.0600 -137.7100      31.7       350       134        60
OIR    2025130    131400  -11.0600 -137.7200      31.4       350       134        60
OIR    2025130    131400  -11.0600 -137.7300      31.0       350       132        60
OIR    2025130    131400  -11.0600 -137.7400      30.7       350       131        60
OIR    2025130    131400  -11.0600 -137.7500      30.5       350       129        60
OIR    2025130    131400  -11.0600 -137.7600      30.2       350       128        60
OIR    2025130    131400  -11.0600 -137.7700      29.7       350       128        60
OIR    2025130    131400  -11.0600 -137.7800      29.2       350       130        60
OIR    2025130    131400  -11.0600 -137.7900      28.6       350       131        60
OIR    2025130    131400  -11.0600 -137.8000      28.0       350       130        60
OIR    2025130    131400  -11.0600 -137.8100      27.7       350       130        60
OIR    2025130    131400  -11.0600 -137.8200      27.7       350       130        60
OIR    2025130    131400  -11.0600 -137.8300      27.6       350       130        60
OIR    2025130    131400  -11.0600 -137.8400      27.6       350       131        60
OIR    2025130    131400  -11.0600 -137.8500      27.6       350       132        60
OIR    2025130    131400  -11.0600 -137.8600      27.6       350       133        60
OIR    2025130    131400  -11.0600 -137.8700      27.5       350       133        60
OIR    2025130    131400  -11.0600 -137.8800      27.5       350       133        60
OIR    2025130    131400  -11.0600 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.0600 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.0600 -137.9100      27.5       351       136        60
OIR    2025130    131400  -11.0600 -137.9200      27.4       351       137        60
OIR    2025130    131400  -11.0600 -137.9300      27.4       351       138        60
OIR    2025130    131400  -11.0600 -137.9400      27.4       351       138        60
OIR    2025130    131400  -11.0600 -137.9500      27.4       351       137        60
OIR    2025130    131400  -11.0600 -137.9600      27.4       351       137        60
OIR    2025130    131400  -11.0600 -137.9700      27.4       351       136        60
OIR    2025130    131400  -11.0600 -137.9800      27.4       351       134        60
OIR    2025130    131400  -11.0600 -137.9900      27.4       351       134        60
OIR    2025130    131400  -11.0600 -138.0000      27.4       351       136        60
OIR    2025130    131400  -11.0600 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.0200      27.4       351       138        60
OIR    2025130    131400  -11.0600 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.0600 -138.0400      27.4       351       138        60
OIR    2025130    131400  -11.0600 -138.0500      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.0700      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.0800      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.0900      27.4       351       140        60
OIR    2025130    131400  -11.0600 -138.1000      27.4       351       142        60
OIR    2025130    131400  -11.0600 -138.1100      27.4       351       141        60
OIR    2025130    131400  -11.0600 -138.1200      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.1300      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.1400      27.4       351       139        60
OIR    2025130    131400  -11.0600 -138.1500      27.4       351       138        60
OIR    2025130    131400  -11.0600 -138.1600      27.4       351       137        60
OIR    2025130    131400  -11.0600 -138.1700      27.4       352       136        60
OIR    2025130    131400  -11.0600 -138.1800      27.4       352       136        60
OIR    2025130    131400  -11.0600 -138.1900      27.4       352       136        60
OIR    2025130    131400  -11.0600 -138.2000      27.4       352       137        60
OIR    2025130    131400  -11.0600 -138.2100      27.3       353       137        60
OIR    2025130    131400  -11.0600 -138.2200      27.4       353       137        60
OIR    2025130    131400  -11.0600 -138.2300      27.4       354       138        60
OIR    2025130    131400  -11.0600 -138.2400      27.3       354       137        60
OIR    2025130    131400  -11.0600 -138.2500      27.2       355       137        60
OIR    2025130    131400  -11.0600 -138.2600      27.2       356       138        60
OIR    2025130    131400  -11.0600 -138.2700      27.1       356       139        60
OIR    2025130    131400  -11.0600 -138.2800      27.0       357       141        60
OIR    2025130    131400  -11.0600 -138.2900      26.9       357       141        60
OIR    2025130    131400  -11.0600 -138.3000      26.9       358       142        60
OIR    2025130    131400  -11.0600 -138.3100      26.8       358       142        60
OIR    2025130    131400  -11.0600 -138.3200      26.7       358       142        60
OIR    2025130    131400  -11.0600 -138.3300      26.6       359       142        60
OIR    2025130    131400  -11.0600 -138.3400      26.5       359       143        60
OIR    2025130    131400  -11.0600 -138.3500      26.4       359       147        60
OIR    2025130    131400  -11.0700 -132.5100      13.6        26       133        60
OIR    2025130    131400  -11.0700 -136.6400      39.9        19       149        60
OIR    2025130    131400  -11.0700 -136.6500      39.9        18       148        60
OIR    2025130    131400  -11.0700 -136.6600      39.9        18       147        60
OIR    2025130    131400  -11.0700 -136.6700      39.9        18       143        60
OIR    2025130    131400  -11.0700 -136.6800      39.9        18       138        60
OIR    2025130    131400  -11.0700 -136.6900      39.9        18       136        60
OIR    2025130    131400  -11.0700 -136.7000      39.9        18       135        60
OIR    2025130    131400  -11.0700 -136.7100      39.9        18       138        60
OIR    2025130    131400  -11.0700 -136.7200      40.0        18       142        60
OIR    2025130    131400  -11.0700 -136.7300      40.0        18       142        60
OIR    2025130    131400  -11.0700 -136.7400      40.0        18       143        60
OIR    2025130    131400  -11.0700 -136.7500      40.0        18       144        60
OIR    2025130    131400  -11.0700 -136.7600      40.1        18       145        60
OIR    2025130    131400  -11.0700 -136.7700      40.1        18       145        60
OIR    2025130    131400  -11.0700 -136.7800      40.1        18       145        60
OIR    2025130    131400  -11.0700 -136.7900      40.2        18       145        60
OIR    2025130    131400  -11.0700 -136.8000      40.3        18       145        60
OIR    2025130    131400  -11.0700 -136.8100      40.4        18       147        60
OIR    2025130    131400  -11.0700 -136.8200      40.4        18       145        60
OIR    2025130    131400  -11.0700 -136.8300      40.5        18       143        60
OIR    2025130    131400  -11.0700 -136.8400      40.5        18       141        60
OIR    2025130    131400  -11.0700 -136.8500      40.5        18       140        60
OIR    2025130    131400  -11.0700 -136.8600      40.5        18       140        60
OIR    2025130    131400  -11.0700 -136.8700      40.5        18       141        60
OIR    2025130    131400  -11.0700 -136.8800      40.5        18       141        60
OIR    2025130    131400  -11.0700 -136.8900      40.5        18       142        60
OIR    2025130    131400  -11.0700 -136.9000      40.5        18       142        60
OIR    2025130    131400  -11.0700 -136.9100      40.5        18       143        60
OIR    2025130    131400  -11.0700 -136.9200      40.5        18       144        60
OIR    2025130    131400  -11.0700 -136.9300      40.5        18       144        60
OIR    2025130    131400  -11.0700 -136.9400      40.4        18       144        60
OIR    2025130    131400  -11.0700 -136.9500      40.1        17       143        60
OIR    2025130    131400  -11.0700 -136.9600      39.8        16       143        60
OIR    2025130    131400  -11.0700 -136.9700      39.6        16       141        60
OIR    2025130    131400  -11.0700 -136.9800      39.4        15       140        60
OIR    2025130    131400  -11.0700 -136.9900      38.8        14       141        60
OIR    2025130    131400  -11.0700 -137.0000      38.6        14       141        60
OIR    2025130    131400  -11.0700 -137.0100      38.5        14       141        60
OIR    2025130    131400  -11.0700 -137.0200      38.4        13       141        60
OIR    2025130    131400  -11.0700 -137.0300      38.3        13       141        60
OIR    2025130    131400  -11.0700 -137.0400      38.3        13       140        60
OIR    2025130    131400  -11.0700 -137.0500      38.2        13       140        60
OIR    2025130    131400  -11.0700 -137.0600      38.2        12       139        60
OIR    2025130    131400  -11.0700 -137.0700      38.2        12       139        60
OIR    2025130    131400  -11.0700 -137.0800      38.3        12       141        60
OIR    2025130    131400  -11.0700 -137.0900      38.3        11       142        60
OIR    2025130    131400  -11.0700 -137.1000      38.4        11       142        60
OIR    2025130    131400  -11.0700 -137.1100      38.5        11       142        60
OIR    2025130    131400  -11.0700 -137.1200      38.5        10       142        60
OIR    2025130    131400  -11.0700 -137.1300      38.6        10       141        60
OIR    2025130    131400  -11.0700 -137.1400      38.6        10       141        60
OIR    2025130    131400  -11.0700 -137.1500      38.6        10       142        60
OIR    2025130    131400  -11.0700 -137.1600      38.7        10       142        60
OIR    2025130    131400  -11.0700 -137.1700      38.7         9       144        60
OIR    2025130    131400  -11.0700 -137.1800      38.8         9       147        60
OIR    2025130    131400  -11.0700 -137.1900      38.9         9       143        60
OIR    2025130    131400  -11.0700 -137.2000      39.1         9       140        60
OIR    2025130    131400  -11.0700 -137.2100      39.2         8       138        60
OIR    2025130    131400  -11.0700 -137.2200      39.4         8       137        60
OIR    2025130    131400  -11.0700 -137.2300      39.6         7       135        60
OIR    2025130    131400  -11.0700 -137.2400      39.9         7       135        60
OIR    2025130    131400  -11.0700 -137.2500      40.3         6       136        60
OIR    2025130    131400  -11.0700 -137.2600      40.7         6       135        60
OIR    2025130    131400  -11.0700 -137.2700      40.8         5       133        60
OIR    2025130    131400  -11.0700 -137.2800      40.9         5       131        60
OIR    2025130    131400  -11.0700 -137.2900      41.0         5       128        60
OIR    2025130    131400  -11.0700 -137.3000      41.0         4       127        60
OIR    2025130    131400  -11.0700 -137.3100      41.0         4       126        60
OIR    2025130    131400  -11.0700 -137.3200      40.9         3       125        60
OIR    2025130    131400  -11.0700 -137.3300      40.8         3       124        60
OIR    2025130    131400  -11.0700 -137.3400      40.7         2       124        60
OIR    2025130    131400  -11.0700 -137.3500      40.4         1       124        60
OIR    2025130    131400  -11.0700 -137.3600      40.0         1       124        60
OIR    2025130    131400  -11.0700 -137.3700      39.6       360       125        60
OIR    2025130    131400  -11.0700 -137.3800      39.4       359       126        60
OIR    2025130    131400  -11.0700 -137.3900      39.3       359       126        60
OIR    2025130    131400  -11.0700 -137.4000      39.4       358       125        60
OIR    2025130    131400  -11.0700 -137.4100      39.4       358       126        60
OIR    2025130    131400  -11.0700 -137.4200      39.5       357       126        60
OIR    2025130    131400  -11.0700 -137.4300      39.7       357       128        60
OIR    2025130    131400  -11.0700 -137.4400      39.8       357       129        60
OIR    2025130    131400  -11.0700 -137.4500      39.8       356       130        60
OIR    2025130    131400  -11.0700 -137.4600      39.9       356       130        60
OIR    2025130    131400  -11.0700 -137.4700      39.9       356       130        60
OIR    2025130    131400  -11.0700 -137.4800      39.9       356       131        60
OIR    2025130    131400  -11.0700 -137.4900      39.8       356       132        60
OIR    2025130    131400  -11.0700 -137.5000      39.8       356       133        60
OIR    2025130    131400  -11.0700 -137.5100      39.8       356       134        60
OIR    2025130    131400  -11.0700 -137.5200      39.8       356       134        60
OIR    2025130    131400  -11.0700 -137.5300      39.8       356       133        60
OIR    2025130    131400  -11.0700 -137.5400      39.8       356       136        60
OIR    2025130    131400  -11.0700 -137.5500      39.8       356       138        60
OIR    2025130    131400  -11.0700 -137.5600      39.8       356       140        60
OIR    2025130    131400  -11.0700 -137.5700      39.7       356       141        60
OIR    2025130    131400  -11.0700 -137.5800      39.4       356       142        60
OIR    2025130    131400  -11.0700 -137.5900      39.1       356       142        60
OIR    2025130    131400  -11.0700 -137.6000      38.6       355       142        60
OIR    2025130    131400  -11.0700 -137.6100      37.8       354       143        60
OIR    2025130    131400  -11.0700 -137.6200      37.0       354       144        60
OIR    2025130    131400  -11.0700 -137.6300      36.3       354       142        60
OIR    2025130    131400  -11.0700 -137.6400      35.5       353       140        60
OIR    2025130    131400  -11.0700 -137.6500      34.7       352       139        60
OIR    2025130    131400  -11.0700 -137.6600      33.9       352       139        60
OIR    2025130    131400  -11.0700 -137.6700      33.4       351       138        60
OIR    2025130    131400  -11.0700 -137.6800      33.0       351       137        60
OIR    2025130    131400  -11.0700 -137.6900      32.5       351       136        60
OIR    2025130    131400  -11.0700 -137.7000      32.1       350       136        60
OIR    2025130    131400  -11.0700 -137.7100      31.6       350       136        60
OIR    2025130    131400  -11.0700 -137.7200      31.4       350       136        60
OIR    2025130    131400  -11.0700 -137.7300      31.1       350       135        60
OIR    2025130    131400  -11.0700 -137.7400      30.8       350       134        60
OIR    2025130    131400  -11.0700 -137.7500      30.5       350       131        60
OIR    2025130    131400  -11.0700 -137.7600      30.2       350       130        60
OIR    2025130    131400  -11.0700 -137.7700      29.7       350       129        60
OIR    2025130    131400  -11.0700 -137.7800      29.1       350       130        60
OIR    2025130    131400  -11.0700 -137.7900      28.4       350       131        60
OIR    2025130    131400  -11.0700 -137.8000      27.9       350       131        60
OIR    2025130    131400  -11.0700 -137.8100      27.7       350       130        60
OIR    2025130    131400  -11.0700 -137.8200      27.7       350       129        60
OIR    2025130    131400  -11.0700 -137.8300      27.6       350       130        60
OIR    2025130    131400  -11.0700 -137.8400      27.6       350       130        60
OIR    2025130    131400  -11.0700 -137.8500      27.6       350       131        60
OIR    2025130    131400  -11.0700 -137.8600      27.6       350       132        60
OIR    2025130    131400  -11.0700 -137.8700      27.6       350       132        60
OIR    2025130    131400  -11.0700 -137.8800      27.5       350       132        60
OIR    2025130    131400  -11.0700 -137.8900      27.5       350       133        60
OIR    2025130    131400  -11.0700 -137.9000      27.5       350       133        60
OIR    2025130    131400  -11.0700 -137.9100      27.5       350       135        60
OIR    2025130    131400  -11.0700 -137.9200      27.5       351       136        60
OIR    2025130    131400  -11.0700 -137.9300      27.4       351       137        60
OIR    2025130    131400  -11.0700 -137.9400      27.4       351       136        60
OIR    2025130    131400  -11.0700 -137.9500      27.4       351       136        60
OIR    2025130    131400  -11.0700 -137.9600      27.4       351       136        60
OIR    2025130    131400  -11.0700 -137.9700      27.4       351       137        60
OIR    2025130    131400  -11.0700 -137.9800      27.4       351       136        60
OIR    2025130    131400  -11.0700 -137.9900      27.4       351       136        60
OIR    2025130    131400  -11.0700 -138.0000      27.4       351       137        60
OIR    2025130    131400  -11.0700 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.0200      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.0700 -138.0400      27.4       351       137        60
OIR    2025130    131400  -11.0700 -138.0500      27.4       351       137        60
OIR    2025130    131400  -11.0700 -138.0600      27.4       351       138        60
OIR    2025130    131400  -11.0700 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.0700 -138.0800      27.4       351       138        60
OIR    2025130    131400  -11.0700 -138.0900      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.1000      27.4       351       141        60
OIR    2025130    131400  -11.0700 -138.1100      27.4       351       140        60
OIR    2025130    131400  -11.0700 -138.1200      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.1300      27.4       351       140        60
OIR    2025130    131400  -11.0700 -138.1400      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.1500      27.4       351       139        60
OIR    2025130    131400  -11.0700 -138.1600      27.4       351       138        60
OIR    2025130    131400  -11.0700 -138.1700      27.4       351       137        60
OIR    2025130    131400  -11.0700 -138.1800      27.4       351       137        60
OIR    2025130    131400  -11.0700 -138.1900      27.4       352       137        60
OIR    2025130    131400  -11.0700 -138.2000      27.4       352       136        60
OIR    2025130    131400  -11.0700 -138.2100      27.4       352       136        60
OIR    2025130    131400  -11.0700 -138.2200      27.3       353       136        60
OIR    2025130    131400  -11.0700 -138.2300      27.3       353       137        60
OIR    2025130    131400  -11.0700 -138.2400      27.3       354       137        60
OIR    2025130    131400  -11.0700 -138.2500      27.2       354       138        60
OIR    2025130    131400  -11.0700 -138.2600      27.1       355       139        60
OIR    2025130    131400  -11.0700 -138.2700      27.1       356       139        60
OIR    2025130    131400  -11.0700 -138.2800      27.0       356       141        60
OIR    2025130    131400  -11.0700 -138.2900      26.9       357       141        60
OIR    2025130    131400  -11.0700 -138.3000      26.8       357       142        60
OIR    2025130    131400  -11.0700 -138.3100      26.7       358       142        60
OIR    2025130    131400  -11.0700 -138.3200      26.6       358       142        60
OIR    2025130    131400  -11.0700 -138.3300      26.5       358       143        60
OIR    2025130    131400  -11.0700 -138.3400      26.4       359       144        60
OIR    2025130    131400  -11.0700 -138.3500      26.2       359       149        60
OIR    2025130    131400  -11.0700 -138.3900      25.6         1       148        60
OIR    2025130    131400  -11.0700 -138.4000      25.5         1       149        60
OIR    2025130    131400  -11.0800 -136.6400      39.9        19       151        60
OIR    2025130    131400  -11.0800 -136.6500      39.9        19       149        60
OIR    2025130    131400  -11.0800 -136.6600      39.9        18       147        60
OIR    2025130    131400  -11.0800 -136.6700      39.9        18       143        60
OIR    2025130    131400  -11.0800 -136.6800      39.9        18       138        60
OIR    2025130    131400  -11.0800 -136.6900      39.9        18       137        60
OIR    2025130    131400  -11.0800 -136.7000      39.9        18       137        60
OIR    2025130    131400  -11.0800 -136.7100      39.9        18       140        60
OIR    2025130    131400  -11.0800 -136.7200      39.9        18       143        60
OIR    2025130    131400  -11.0800 -136.7300      40.0        18       144        60
OIR    2025130    131400  -11.0800 -136.7400      40.0        18       146        60
OIR    2025130    131400  -11.0800 -136.7500      40.0        18       147        60
OIR    2025130    131400  -11.0800 -136.7600      40.0        18       148        60
OIR    2025130    131400  -11.0800 -136.7700      40.1        18       148        60
OIR    2025130    131400  -11.0800 -136.7800      40.1        18       147        60
OIR    2025130    131400  -11.0800 -136.7900      40.1        18       146        60
OIR    2025130    131400  -11.0800 -136.8000      40.2        18       146        60
OIR    2025130    131400  -11.0800 -136.8100      40.3        18       149        60
OIR    2025130    131400  -11.0800 -136.8200      40.4        18       146        60
OIR    2025130    131400  -11.0800 -136.8300      40.4        18       142        60
OIR    2025130    131400  -11.0800 -136.8400      40.5        18       141        60
OIR    2025130    131400  -11.0800 -136.8500      40.5        18       139        60
OIR    2025130    131400  -11.0800 -136.8600      40.5        18       140        60
OIR    2025130    131400  -11.0800 -136.8700      40.5        18       141        60
OIR    2025130    131400  -11.0800 -136.8800      40.5        18       143        60
OIR    2025130    131400  -11.0800 -136.8900      40.5        18       144        60
OIR    2025130    131400  -11.0800 -136.9000      40.5        18       144        60
OIR    2025130    131400  -11.0800 -136.9100      40.5        18       144        60
OIR    2025130    131400  -11.0800 -136.9200      40.5        18       144        60
OIR    2025130    131400  -11.0800 -136.9300      40.5        18       145        60
OIR    2025130    131400  -11.0800 -136.9400      40.4        18       146        60
OIR    2025130    131400  -11.0800 -136.9500      40.2        17       145        60
OIR    2025130    131400  -11.0800 -136.9600      39.8        16       144        60
OIR    2025130    131400  -11.0800 -136.9700      39.5        16       143        60
OIR    2025130    131400  -11.0800 -136.9800      39.3        16       141        60
OIR    2025130    131400  -11.0800 -136.9900      38.7        14       141        60
OIR    2025130    131400  -11.0800 -137.0000      38.5        14       141        60
OIR    2025130    131400  -11.0800 -137.0100      38.3        14       141        60
OIR    2025130    131400  -11.0800 -137.0200      38.2        13       141        60
OIR    2025130    131400  -11.0800 -137.0300      38.1        13       140        60
OIR    2025130    131400  -11.0800 -137.0400      38.1        13       140        60
OIR    2025130    131400  -11.0800 -137.0500      38.0        12       141        60
OIR    2025130    131400  -11.0800 -137.0600      38.0        12       141        60
OIR    2025130    131400  -11.0800 -137.0700      38.1        12       141        60
OIR    2025130    131400  -11.0800 -137.0800      38.1        12       142        60
OIR    2025130    131400  -11.0800 -137.0900      38.2        11       143        60
OIR    2025130    131400  -11.0800 -137.1000      38.2        11       143        60
OIR    2025130    131400  -11.0800 -137.1100      38.3        11       142        60
OIR    2025130    131400  -11.0800 -137.1200      38.3        10       141        60
OIR    2025130    131400  -11.0800 -137.1300      38.4        10       141        60
OIR    2025130    131400  -11.0800 -137.1400      38.5        10       141        60
OIR    2025130    131400  -11.0800 -137.1500      38.5        10       142        60
OIR    2025130    131400  -11.0800 -137.1600      38.6        10       143        60
OIR    2025130    131400  -11.0800 -137.1700      38.7         9       143        60
OIR    2025130    131400  -11.0800 -137.1800      38.7         9       143        60
OIR    2025130    131400  -11.0800 -137.1900      38.8         9       142        60
OIR    2025130    131400  -11.0800 -137.2000      39.0         8       141        60
OIR    2025130    131400  -11.0800 -137.2100      39.1         8       141        60
OIR    2025130    131400  -11.0800 -137.2200      39.2         8       140        60
OIR    2025130    131400  -11.0800 -137.2300      39.5         7       138        60
OIR    2025130    131400  -11.0800 -137.2400      39.8         7       138        60
OIR    2025130    131400  -11.0800 -137.2500      40.3         6       139        60
OIR    2025130    131400  -11.0800 -137.2600      40.6         6       138        60
OIR    2025130    131400  -11.0800 -137.2700      40.8         5       138        60
OIR    2025130    131400  -11.0800 -137.2800      40.9         5       135        60
OIR    2025130    131400  -11.0800 -137.2900      41.0         4       133        60
OIR    2025130    131400  -11.0800 -137.3000      41.0         4       132        60
OIR    2025130    131400  -11.0800 -137.3100      41.0         3       131        60
OIR    2025130    131400  -11.0800 -137.3200      41.0         3       129        60
OIR    2025130    131400  -11.0800 -137.3300      40.9         2       128        60
OIR    2025130    131400  -11.0800 -137.3400      40.7         2       128        60
OIR    2025130    131400  -11.0800 -137.3500      40.3         1       128        60
OIR    2025130    131400  -11.0800 -137.3600      40.0         0       128        60
OIR    2025130    131400  -11.0800 -137.3700      39.7       359       128        60
OIR    2025130    131400  -11.0800 -137.3800      39.6       359       128        60
OIR    2025130    131400  -11.0800 -137.3900      39.5       358       128        60
OIR    2025130    131400  -11.0800 -137.4000      39.5       358       128        60
OIR    2025130    131400  -11.0800 -137.4100      39.6       357       128        60
OIR    2025130    131400  -11.0800 -137.4200      39.7       357       128        60
OIR    2025130    131400  -11.0800 -137.4300      39.8       357       129        60
OIR    2025130    131400  -11.0800 -137.4400      39.8       356       130        60
OIR    2025130    131400  -11.0800 -137.4500      39.9       356       131        60
OIR    2025130    131400  -11.0800 -137.4600      39.9       356       131        60
OIR    2025130    131400  -11.0800 -137.4700      39.9       356       131        60
OIR    2025130    131400  -11.0800 -137.4800      39.9       356       132        60
OIR    2025130    131400  -11.0800 -137.4900      39.8       356       132        60
OIR    2025130    131400  -11.0800 -137.5000      39.8       356       133        60
OIR    2025130    131400  -11.0800 -137.5100      39.8       356       133        60
OIR    2025130    131400  -11.0800 -137.5200      39.8       356       132        60
OIR    2025130    131400  -11.0800 -137.5300      39.8       356       131        60
OIR    2025130    131400  -11.0800 -137.5400      39.8       356       134        60
OIR    2025130    131400  -11.0800 -137.5500      39.8       356       137        60
OIR    2025130    131400  -11.0800 -137.5600      39.7       356       139        60
OIR    2025130    131400  -11.0800 -137.5700      39.7       356       141        60
OIR    2025130    131400  -11.0800 -137.5800      39.6       356       142        60
OIR    2025130    131400  -11.0800 -137.5900      39.4       356       143        60
OIR    2025130    131400  -11.0800 -137.6000      39.2       355       142        60
OIR    2025130    131400  -11.0800 -137.6100      38.8       355       144        60
OIR    2025130    131400  -11.0800 -137.6200      38.2       355       147        60
OIR    2025130    131400  -11.0800 -137.6300      37.5       354       145        60
OIR    2025130    131400  -11.0800 -137.6400      36.6       354       143        60
OIR    2025130    131400  -11.0800 -137.6500      35.5       353       141        60
OIR    2025130    131400  -11.0800 -137.6600      34.3       352       140        60
OIR    2025130    131400  -11.0800 -137.6700      33.4       351       139        60
OIR    2025130    131400  -11.0800 -137.6800      32.9       351       138        60
OIR    2025130    131400  -11.0800 -137.6900      32.4       350       137        60
OIR    2025130    131400  -11.0800 -137.7000      32.0       350       137        60
OIR    2025130    131400  -11.0800 -137.7100      31.6       350       137        60
OIR    2025130    131400  -11.0800 -137.7200      31.4       350       138        60
OIR    2025130    131400  -11.0800 -137.7300      31.1       350       138        60
OIR    2025130    131400  -11.0800 -137.7400      30.8       350       137        60
OIR    2025130    131400  -11.0800 -137.7500      30.6       350       134        60
OIR    2025130    131400  -11.0800 -137.7600      30.2       350       133        60
OIR    2025130    131400  -11.0800 -137.7700      29.6       350       132        60
OIR    2025130    131400  -11.0800 -137.7800      28.9       350       132        60
OIR    2025130    131400  -11.0800 -137.7900      28.2       350       132        60
OIR    2025130    131400  -11.0800 -137.8000      27.8       350       132        60
OIR    2025130    131400  -11.0800 -137.8100      27.7       350       131        60
OIR    2025130    131400  -11.0800 -137.8200      27.7       350       130        60
OIR    2025130    131400  -11.0800 -137.8300      27.6       350       130        60
OIR    2025130    131400  -11.0800 -137.8400      27.6       350       130        60
OIR    2025130    131400  -11.0800 -137.8500      27.6       350       130        60
OIR    2025130    131400  -11.0800 -137.8600      27.6       350       132        60
OIR    2025130    131400  -11.0800 -137.8700      27.6       350       131        60
OIR    2025130    131400  -11.0800 -137.8800      27.5       350       131        60
OIR    2025130    131400  -11.0800 -137.8900      27.5       350       132        60
OIR    2025130    131400  -11.0800 -137.9000      27.5       350       132        60
OIR    2025130    131400  -11.0800 -137.9100      27.5       350       133        60
OIR    2025130    131400  -11.0800 -137.9200      27.5       350       134        60
OIR    2025130    131400  -11.0800 -137.9300      27.5       351       135        60
OIR    2025130    131400  -11.0800 -137.9400      27.4       351       135        60
OIR    2025130    131400  -11.0800 -137.9500      27.4       351       135        60
OIR    2025130    131400  -11.0800 -137.9600      27.4       351       135        60
OIR    2025130    131400  -11.0800 -137.9700      27.4       351       137        60
OIR    2025130    131400  -11.0800 -137.9800      27.4       351       138        60
OIR    2025130    131400  -11.0800 -137.9900      27.4       351       138        60
OIR    2025130    131400  -11.0800 -138.0000      27.4       351       138        60
OIR    2025130    131400  -11.0800 -138.0100      27.4       351       139        60
OIR    2025130    131400  -11.0800 -138.0200      27.4       351       139        60
OIR    2025130    131400  -11.0800 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.0800 -138.0400      27.4       351       136        60
OIR    2025130    131400  -11.0800 -138.0500      27.4       351       136        60
OIR    2025130    131400  -11.0800 -138.0600      27.4       351       137        60
OIR    2025130    131400  -11.0800 -138.0700      27.4       351       137        60
OIR    2025130    131400  -11.0800 -138.0800      27.4       351       137        60
OIR    2025130    131400  -11.0800 -138.0900      27.4       351       139        60
OIR    2025130    131400  -11.0800 -138.1000      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1100      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1200      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1300      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1400      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1500      27.4       351       140        60
OIR    2025130    131400  -11.0800 -138.1600      27.4       351       139        60
OIR    2025130    131400  -11.0800 -138.1700      27.4       351       139        60
OIR    2025130    131400  -11.0800 -138.1800      27.4       351       138        60
OIR    2025130    131400  -11.0800 -138.1900      27.4       351       137        60
OIR    2025130    131400  -11.0800 -138.2000      27.4       352       136        60
OIR    2025130    131400  -11.0800 -138.2100      27.4       352       135        60
OIR    2025130    131400  -11.0800 -138.2200      27.3       352       135        60
OIR    2025130    131400  -11.0800 -138.2300      27.3       353       135        60
OIR    2025130    131400  -11.0800 -138.2400      27.3       353       138        60
OIR    2025130    131400  -11.0800 -138.2500      27.2       354       139        60
OIR    2025130    131400  -11.0800 -138.2600      27.1       354       139        60
OIR    2025130    131400  -11.0800 -138.2700      27.0       355       140        60
OIR    2025130    131400  -11.0800 -138.2800      26.9       356       141        60
OIR    2025130    131400  -11.0800 -138.2900      26.8       357       141        60
OIR    2025130    131400  -11.0800 -138.3000      26.7       357       142        60
OIR    2025130    131400  -11.0800 -138.3100      26.6       358       142        60
OIR    2025130    131400  -11.0800 -138.3200      26.5       358       143        60
OIR    2025130    131400  -11.0800 -138.3300      26.3       358       144        60
OIR    2025130    131400  -11.0800 -138.3400      26.2       359       145        60
OIR    2025130    131400  -11.0800 -138.3700      25.7         0       148        60
OIR    2025130    131400  -11.0800 -138.3800      25.6         1       146        60
OIR    2025130    131400  -11.0800 -138.3900      25.5         1       146        60
OIR    2025130    131400  -11.0800 -138.4000      25.4         1       148        60
OIR    2025130    131400  -11.0900 -136.6500      39.9        19       150        60
OIR    2025130    131400  -11.0900 -136.6600      39.9        18       148        60
OIR    2025130    131400  -11.0900 -136.6700      39.9        18       145        60
OIR    2025130    131400  -11.0900 -136.6800      39.9        18       141        60
OIR    2025130    131400  -11.0900 -136.6900      39.9        18       140        60
OIR    2025130    131400  -11.0900 -136.7000      39.9        18       139        60
OIR    2025130    131400  -11.0900 -136.7100      39.9        18       141        60
OIR    2025130    131400  -11.0900 -136.7200      39.9        18       142        60
OIR    2025130    131400  -11.0900 -136.7300      39.9        18       144        60
OIR    2025130    131400  -11.0900 -136.7400      40.0        18       147        60
OIR    2025130    131400  -11.0900 -136.7500      40.0        18       149        60
OIR    2025130    131400  -11.0900 -136.7600      40.0        18       150        60
OIR    2025130    131400  -11.0900 -136.7700      40.0        18       148        60
OIR    2025130    131400  -11.0900 -136.7800      40.0        18       147        60
OIR    2025130    131400  -11.0900 -136.7900      40.1        18       146        60
OIR    2025130    131400  -11.0900 -136.8000      40.2        18       146        60
OIR    2025130    131400  -11.0900 -136.8100      40.3        18       147        60
OIR    2025130    131400  -11.0900 -136.8200      40.4        18       144        60
OIR    2025130    131400  -11.0900 -136.8300      40.4        18       140        60
OIR    2025130    131400  -11.0900 -136.8400      40.5        18       138        60
OIR    2025130    131400  -11.0900 -136.8500      40.5        18       137        60
OIR    2025130    131400  -11.0900 -136.8600      40.5        18       138        60
OIR    2025130    131400  -11.0900 -136.8700      40.5        18       140        60
OIR    2025130    131400  -11.0900 -136.8800      40.5        18       142        60
OIR    2025130    131400  -11.0900 -136.8900      40.5        18       143        60
OIR    2025130    131400  -11.0900 -136.9000      40.5        18       144        60
OIR    2025130    131400  -11.0900 -136.9100      40.5        18       145        60
OIR    2025130    131400  -11.0900 -136.9200      40.5        18       145        60
OIR    2025130    131400  -11.0900 -136.9300      40.5        18       146        60
OIR    2025130    131400  -11.0900 -136.9400      40.4        18       147        60
OIR    2025130    131400  -11.0900 -136.9500      40.3        18       146        60
OIR    2025130    131400  -11.0900 -136.9600      39.9        17       145        60
OIR    2025130    131400  -11.0900 -136.9700      39.4        16       143        60
OIR    2025130    131400  -11.0900 -136.9800      39.2        16       141        60
OIR    2025130    131400  -11.0900 -136.9900      38.5        14       141        60
OIR    2025130    131400  -11.0900 -137.0000      38.3        14       141        60
OIR    2025130    131400  -11.0900 -137.0100      38.1        14       141        60
OIR    2025130    131400  -11.0900 -137.0200      38.0        13       141        60
OIR    2025130    131400  -11.0900 -137.0300      38.0        13       140        60
OIR    2025130    131400  -11.0900 -137.0400      37.9        13       141        60
OIR    2025130    131400  -11.0900 -137.0500      37.9        12       142        60
OIR    2025130    131400  -11.0900 -137.0600      37.9        12       142        60
OIR    2025130    131400  -11.0900 -137.0700      37.9        12       141        60
OIR    2025130    131400  -11.0900 -137.0800      37.9        11       142        60
OIR    2025130    131400  -11.0900 -137.0900      38.0        11       142        60
OIR    2025130    131400  -11.0900 -137.1000      38.1        11       142        60
OIR    2025130    131400  -11.0900 -137.1100      38.1        11       142        60
OIR    2025130    131400  -11.0900 -137.1200      38.2        10       142        60
OIR    2025130    131400  -11.0900 -137.1300      38.3        10       142        60
OIR    2025130    131400  -11.0900 -137.1400      38.3        10       142        60
OIR    2025130    131400  -11.0900 -137.1500      38.4        10       143        60
OIR    2025130    131400  -11.0900 -137.1600      38.5         9       144        60
OIR    2025130    131400  -11.0900 -137.1700      38.5         9       143        60
OIR    2025130    131400  -11.0900 -137.1800      38.6         9       142        60
OIR    2025130    131400  -11.0900 -137.1900      38.7         9       141        60
OIR    2025130    131400  -11.0900 -137.2000      38.8         8       141        60
OIR    2025130    131400  -11.0900 -137.2100      39.0         8       141        60
OIR    2025130    131400  -11.0900 -137.2200      39.2         8       141        60
OIR    2025130    131400  -11.0900 -137.2300      39.4         7       139        60
OIR    2025130    131400  -11.0900 -137.2400      39.7         7       139        60
OIR    2025130    131400  -11.0900 -137.2500      40.2         6       141        60
OIR    2025130    131400  -11.0900 -137.2600      40.6         5       140        60
OIR    2025130    131400  -11.0900 -137.2700      40.8         5       140        60
OIR    2025130    131400  -11.0900 -137.2800      40.9         5       139        60
OIR    2025130    131400  -11.0900 -137.2900      41.0         4       137        60
OIR    2025130    131400  -11.0900 -137.3000      41.0         4       136        60
OIR    2025130    131400  -11.0900 -137.3100      41.0         3       135        60
OIR    2025130    131400  -11.0900 -137.3200      41.0         3       134        60
OIR    2025130    131400  -11.0900 -137.3300      40.8         2       133        60
OIR    2025130    131400  -11.0900 -137.3400      40.6         1       132        60
OIR    2025130    131400  -11.0900 -137.3500      40.2         0       131        60
OIR    2025130    131400  -11.0900 -137.3600      40.0       360       130        60
OIR    2025130    131400  -11.0900 -137.3700      39.8       359       129        60
OIR    2025130    131400  -11.0900 -137.3800      39.7       359       129        60
OIR    2025130    131400  -11.0900 -137.3900      39.6       358       130        60
OIR    2025130    131400  -11.0900 -137.4000      39.6       357       130        60
OIR    2025130    131400  -11.0900 -137.4100      39.7       357       129        60
OIR    2025130    131400  -11.0900 -137.4200      39.8       357       128        60
OIR    2025130    131400  -11.0900 -137.4300      39.8       357       129        60
OIR    2025130    131400  -11.0900 -137.4400      39.8       356       129        60
OIR    2025130    131400  -11.0900 -137.4500      39.9       356       130        60
OIR    2025130    131400  -11.0900 -137.4600      39.9       356       130        60
OIR    2025130    131400  -11.0900 -137.4700      39.9       356       130        60
OIR    2025130    131400  -11.0900 -137.4800      39.8       356       131        60
OIR    2025130    131400  -11.0900 -137.4900      39.8       356       131        60
OIR    2025130    131400  -11.0900 -137.5000      39.8       356       131        60
OIR    2025130    131400  -11.0900 -137.5100      39.8       356       131        60
OIR    2025130    131400  -11.0900 -137.5200      39.8       356       131        60
OIR    2025130    131400  -11.0900 -137.5300      39.8       356       130        60
OIR    2025130    131400  -11.0900 -137.5400      39.8       356       132        60
OIR    2025130    131400  -11.0900 -137.5500      39.8       356       134        60
OIR    2025130    131400  -11.0900 -137.5600      39.7       356       138        60
OIR    2025130    131400  -11.0900 -137.5700      39.7       356       140        60
OIR    2025130    131400  -11.0900 -137.5800      39.6       356       142        60
OIR    2025130    131400  -11.0900 -137.5900      39.5       356       142        60
OIR    2025130    131400  -11.0900 -137.6000      39.4       356       142        60
OIR    2025130    131400  -11.0900 -137.6100      39.1       355       145        60
OIR    2025130    131400  -11.0900 -137.6200      38.8       355       147        60
OIR    2025130    131400  -11.0900 -137.6300      38.3       355       144        60
OIR    2025130    131400  -11.0900 -137.6400      37.6       354       142        60
OIR    2025130    131400  -11.0900 -137.6500      36.5       354       142        60
OIR    2025130    131400  -11.0900 -137.6600      35.0       353       142        60
OIR    2025130    131400  -11.0900 -137.6700      33.5       351       141        60
OIR    2025130    131400  -11.0900 -137.6800      32.9       351       140        60
OIR    2025130    131400  -11.0900 -137.6900      32.3       350       138        60
OIR    2025130    131400  -11.0900 -137.7000      31.9       350       137        60
OIR    2025130    131400  -11.0900 -137.7100      31.6       350       137        60
OIR    2025130    131400  -11.0900 -137.7200      31.4       350       137        60
OIR    2025130    131400  -11.0900 -137.7300      31.1       350       137        60
OIR    2025130    131400  -11.0900 -137.7400      30.9       350       136        60
OIR    2025130    131400  -11.0900 -137.7500      30.6       350       135        60
OIR    2025130    131400  -11.0900 -137.7600      30.1       350       134        60
OIR    2025130    131400  -11.0900 -137.7700      29.4       350       133        60
OIR    2025130    131400  -11.0900 -137.7800      28.8       350       133        60
OIR    2025130    131400  -11.0900 -137.7900      28.1       350       133        60
OIR    2025130    131400  -11.0900 -137.8000      27.8       350       132        60
OIR    2025130    131400  -11.0900 -137.8100      27.7       350       132        60
OIR    2025130    131400  -11.0900 -137.8200      27.7       350       131        60
OIR    2025130    131400  -11.0900 -137.8300      27.6       350       131        60
OIR    2025130    131400  -11.0900 -137.8400      27.6       350       131        60
OIR    2025130    131400  -11.0900 -137.8500      27.6       350       131        60
OIR    2025130    131400  -11.0900 -137.8600      27.6       350       132        60
OIR    2025130    131400  -11.0900 -137.8700      27.6       350       131        60
OIR    2025130    131400  -11.0900 -137.8800      27.5       350       131        60
OIR    2025130    131400  -11.0900 -137.8900      27.5       350       132        60
OIR    2025130    131400  -11.0900 -137.9000      27.5       350       132        60
OIR    2025130    131400  -11.0900 -137.9100      27.5       350       133        60
OIR    2025130    131400  -11.0900 -137.9200      27.5       350       133        60
OIR    2025130    131400  -11.0900 -137.9300      27.5       350       134        60
OIR    2025130    131400  -11.0900 -137.9400      27.5       351       134        60
OIR    2025130    131400  -11.0900 -137.9500      27.4       351       134        60
OIR    2025130    131400  -11.0900 -137.9600      27.4       351       135        60
OIR    2025130    131400  -11.0900 -137.9700      27.4       351       136        60
OIR    2025130    131400  -11.0900 -137.9800      27.4       351       136        60
OIR    2025130    131400  -11.0900 -137.9900      27.4       351       137        60
OIR    2025130    131400  -11.0900 -138.0000      27.4       351       137        60
OIR    2025130    131400  -11.0900 -138.0100      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0200      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0400      27.4       351       137        60
OIR    2025130    131400  -11.0900 -138.0500      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0600      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0800      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.0900      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.1000      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.1100      27.4       351       139        60
OIR    2025130    131400  -11.0900 -138.1200      27.4       351       139        60
OIR    2025130    131400  -11.0900 -138.1300      27.4       351       139        60
OIR    2025130    131400  -11.0900 -138.1400      27.4       351       139        60
OIR    2025130    131400  -11.0900 -138.1500      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.1600      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.1700      27.4       351       138        60
OIR    2025130    131400  -11.0900 -138.1800      27.4       351       137        60
OIR    2025130    131400  -11.0900 -138.1900      27.4       351       136        60
OIR    2025130    131400  -11.0900 -138.2000      27.4       351       136        60
OIR    2025130    131400  -11.0900 -138.2100      27.4       352       135        60
OIR    2025130    131400  -11.0900 -138.2200      27.3       352       136        60
OIR    2025130    131400  -11.0900 -138.2300      27.3       352       137        60
OIR    2025130    131400  -11.0900 -138.2400      27.3       353       138        60
OIR    2025130    131400  -11.0900 -138.2500      27.2       353       140        60
OIR    2025130    131400  -11.0900 -138.2600      27.1       354       140        60
OIR    2025130    131400  -11.0900 -138.2700      27.0       355       141        60
OIR    2025130    131400  -11.0900 -138.2800      26.8       355       142        60
OIR    2025130    131400  -11.0900 -138.2900      26.7       356       143        60
OIR    2025130    131400  -11.0900 -138.3000      26.6       357       144        60
OIR    2025130    131400  -11.0900 -138.3100      26.5       357       144        60
OIR    2025130    131400  -11.0900 -138.3200      26.4       358       145        60
OIR    2025130    131400  -11.0900 -138.3300      26.2       358       145        60
OIR    2025130    131400  -11.0900 -138.3400      26.1       359       145        60
OIR    2025130    131400  -11.0900 -138.3500      25.9       359       148        60
OIR    2025130    131400  -11.0900 -138.3700      25.5         0       148        60
OIR    2025130    131400  -11.0900 -138.3800      25.4         1       147        60
OIR    2025130    131400  -11.0900 -138.3900      25.4         1       147        60
OIR    2025130    131400  -11.0900 -138.4000      25.3         1       147        60
OIR    2025130    131400  -11.0900 -138.4100      25.2         2       148        60
OIR    2025130    131400  -11.1000 -136.6600      39.9        19       149        60
OIR    2025130    131400  -11.1000 -136.6700      39.9        18       148        60
OIR    2025130    131400  -11.1000 -136.6800      39.9        18       147        60
OIR    2025130    131400  -11.1000 -136.6900      39.9        18       144        60
OIR    2025130    131400  -11.1000 -136.7000      39.9        18       142        60
OIR    2025130    131400  -11.1000 -136.7100      39.9        18       141        60
OIR    2025130    131400  -11.1000 -136.7200      39.9        18       141        60
OIR    2025130    131400  -11.1000 -136.7300      39.9        18       143        60
OIR    2025130    131400  -11.1000 -136.7400      39.9        18       147        60
OIR    2025130    131400  -11.1000 -136.7700      40.0        18       146        60
OIR    2025130    131400  -11.1000 -136.7800      40.0        18       145        60
OIR    2025130    131400  -11.1000 -136.7900      40.1        18       145        60
OIR    2025130    131400  -11.1000 -136.8000      40.1        18       145        60
OIR    2025130    131400  -11.1000 -136.8100      40.2        18       144        60
OIR    2025130    131400  -11.1000 -136.8200      40.3        18       140        60
OIR    2025130    131400  -11.1000 -136.8300      40.4        18       136        60
OIR    2025130    131400  -11.1000 -136.8400      40.4        18       135        60
OIR    2025130    131400  -11.1000 -136.8500      40.5        18       135        60
OIR    2025130    131400  -11.1000 -136.8600      40.5        18       136        60
OIR    2025130    131400  -11.1000 -136.8700      40.5        18       137        60
OIR    2025130    131400  -11.1000 -136.8800      40.5        18       140        60
OIR    2025130    131400  -11.1000 -136.8900      40.5        18       142        60
OIR    2025130    131400  -11.1000 -136.9000      40.5        18       143        60
OIR    2025130    131400  -11.1000 -136.9100      40.5        18       145        60
OIR    2025130    131400  -11.1000 -136.9200      40.5        18       146        60
OIR    2025130    131400  -11.1000 -136.9300      40.4        18       147        60
OIR    2025130    131400  -11.1000 -136.9400      40.4        18       147        60
OIR    2025130    131400  -11.1000 -136.9500      40.3        18       146        60
OIR    2025130    131400  -11.1000 -136.9600      40.0        17       146        60
OIR    2025130    131400  -11.1000 -136.9700      39.3        16       143        60
OIR    2025130    131400  -11.1000 -136.9800      39.0        16       141        60
OIR    2025130    131400  -11.1000 -136.9900      38.3        14       141        60
OIR    2025130    131400  -11.1000 -137.0000      38.1        14       141        60
OIR    2025130    131400  -11.1000 -137.0100      38.0        14       142        60
OIR    2025130    131400  -11.1000 -137.0200      37.9        13       142        60
OIR    2025130    131400  -11.1000 -137.0300      37.8        13       140        60
OIR    2025130    131400  -11.1000 -137.0400      37.8        13       141        60
OIR    2025130    131400  -11.1000 -137.0500      37.7        12       143        60
OIR    2025130    131400  -11.1000 -137.0600      37.7        12       142        60
OIR    2025130    131400  -11.1000 -137.0700      37.8        12       142        60
OIR    2025130    131400  -11.1000 -137.0800      37.8        11       141        60
OIR    2025130    131400  -11.1000 -137.0900      37.9        11       141        60
OIR    2025130    131400  -11.1000 -137.1000      37.9        11       142        60
OIR    2025130    131400  -11.1000 -137.1100      38.0        11       142        60
OIR    2025130    131400  -11.1000 -137.1200      38.1        10       142        60
OIR    2025130    131400  -11.1000 -137.1300      38.1        10       143        60
OIR    2025130    131400  -11.1000 -137.1400      38.2        10       143        60
OIR    2025130    131400  -11.1000 -137.1500      38.3        10       144        60
OIR    2025130    131400  -11.1000 -137.1600      38.3         9       144        60
OIR    2025130    131400  -11.1000 -137.1700      38.4         9       143        60
OIR    2025130    131400  -11.1000 -137.1800      38.5         9       141        60
OIR    2025130    131400  -11.1000 -137.1900      38.6         8       141        60
OIR    2025130    131400  -11.1000 -137.2000      38.7         8       142        60
OIR    2025130    131400  -11.1000 -137.2100      38.8         8       141        60
OIR    2025130    131400  -11.1000 -137.2200      39.0         7       141        60
OIR    2025130    131400  -11.1000 -137.2300      39.2         7       140        60
OIR    2025130    131400  -11.1000 -137.2400      39.6         6       141        60
OIR    2025130    131400  -11.1000 -137.2500      39.9         6       142        60
OIR    2025130    131400  -11.1000 -137.2600      40.3         5       142        60
OIR    2025130    131400  -11.1000 -137.2700      40.5         5       142        60
OIR    2025130    131400  -11.1000 -137.2800      40.6         4       141        60
OIR    2025130    131400  -11.1000 -137.2900      40.7         4       141        60
OIR    2025130    131400  -11.1000 -137.3000      40.7         3       140        60
OIR    2025130    131400  -11.1000 -137.3100      40.8         3       139        60
OIR    2025130    131400  -11.1000 -137.3200      40.7         2       139        60
OIR    2025130    131400  -11.1000 -137.3300      40.6         1       138        60
OIR    2025130    131400  -11.1000 -137.3400      40.4         1       135        60
OIR    2025130    131400  -11.1000 -137.3500      40.2       360       133        60
OIR    2025130    131400  -11.1000 -137.3600      40.0       359       131        60
OIR    2025130    131400  -11.1000 -137.3700      39.9       359       131        60
OIR    2025130    131400  -11.1000 -137.3800      39.8       358       131        60
OIR    2025130    131400  -11.1000 -137.3900      39.8       358       131        60
OIR    2025130    131400  -11.1000 -137.4000      39.8       357       131        60
OIR    2025130    131400  -11.1000 -137.4100      39.8       357       130        60
OIR    2025130    131400  -11.1000 -137.4200      39.8       357       128        60
OIR    2025130    131400  -11.1000 -137.4300      39.8       356       128        60
OIR    2025130    131400  -11.1000 -137.4400      39.9       356       129        60
OIR    2025130    131400  -11.1000 -137.4500      39.9       356       129        60
OIR    2025130    131400  -11.1000 -137.4600      39.9       356       129        60
OIR    2025130    131400  -11.1000 -137.4700      39.8       356       129        60
OIR    2025130    131400  -11.1000 -137.4800      39.8       356       129        60
OIR    2025130    131400  -11.1000 -137.4900      39.8       356       129        60
OIR    2025130    131400  -11.1000 -137.5000      39.8       356       129        60
OIR    2025130    131400  -11.1000 -137.5100      39.8       356       129        60
OIR    2025130    131400  -11.1000 -137.5200      39.8       356       130        60
OIR    2025130    131400  -11.1000 -137.5300      39.8       356       130        60
OIR    2025130    131400  -11.1000 -137.5400      39.8       356       131        60
OIR    2025130    131400  -11.1000 -137.5500      39.8       356       132        60
OIR    2025130    131400  -11.1000 -137.5600      39.7       356       137        60
OIR    2025130    131400  -11.1000 -137.5700      39.7       356       139        60
OIR    2025130    131400  -11.1000 -137.5800      39.6       356       141        60
OIR    2025130    131400  -11.1000 -137.5900      39.5       356       142        60
OIR    2025130    131400  -11.1000 -137.6000      39.4       356       143        60
OIR    2025130    131400  -11.1000 -137.6100      39.3       355       145        60
OIR    2025130    131400  -11.1000 -137.6200      39.1       355       147        60
OIR    2025130    131400  -11.1000 -137.6300      38.7       355       144        60
OIR    2025130    131400  -11.1000 -137.6400      38.1       355       142        60
OIR    2025130    131400  -11.1000 -137.6500      37.2       354       143        60
OIR    2025130    131400  -11.1000 -137.6600      35.7       353       144        60
OIR    2025130    131400  -11.1000 -137.6700      33.7       351       143        60
OIR    2025130    131400  -11.1000 -137.6800      32.8       351       141        60
OIR    2025130    131400  -11.1000 -137.6900      32.3       350       139        60
OIR    2025130    131400  -11.1000 -137.7000      31.9       350       138        60
OIR    2025130    131400  -11.1000 -137.7100      31.6       350       137        60
OIR    2025130    131400  -11.1000 -137.7200      31.4       350       137        60
OIR    2025130    131400  -11.1000 -137.7300      31.1       350       136        60
OIR    2025130    131400  -11.1000 -137.7400      30.9       350       136        60
OIR    2025130    131400  -11.1000 -137.7500      30.7       350       136        60
OIR    2025130    131400  -11.1000 -137.7600      30.0       350       135        60
OIR    2025130    131400  -11.1000 -137.7700      29.3       350       134        60
OIR    2025130    131400  -11.1000 -137.7800      28.6       350       134        60
OIR    2025130    131400  -11.1000 -137.7900      28.0       350       133        60
OIR    2025130    131400  -11.1000 -137.8000      27.8       350       133        60
OIR    2025130    131400  -11.1000 -137.8100      27.7       350       133        60
OIR    2025130    131400  -11.1000 -137.8200      27.7       350       133        60
OIR    2025130    131400  -11.1000 -137.8300      27.6       350       133        60
OIR    2025130    131400  -11.1000 -137.8400      27.6       350       133        60
OIR    2025130    131400  -11.1000 -137.8500      27.6       350       133        60
OIR    2025130    131400  -11.1000 -137.8600      27.6       350       132        60
OIR    2025130    131400  -11.1000 -137.8700      27.6       350       132        60
OIR    2025130    131400  -11.1000 -137.8800      27.6       350       132        60
OIR    2025130    131400  -11.1000 -137.8900      27.5       350       132        60
OIR    2025130    131400  -11.1000 -137.9000      27.5       350       132        60
OIR    2025130    131400  -11.1000 -137.9100      27.5       350       132        60
OIR    2025130    131400  -11.1000 -137.9200      27.5       350       132        60
OIR    2025130    131400  -11.1000 -137.9300      27.5       350       133        60
OIR    2025130    131400  -11.1000 -137.9400      27.5       350       133        60
OIR    2025130    131400  -11.1000 -137.9500      27.5       350       134        60
OIR    2025130    131400  -11.1000 -137.9600      27.4       351       134        60
OIR    2025130    131400  -11.1000 -137.9700      27.4       351       134        60
OIR    2025130    131400  -11.1000 -137.9800      27.4       351       135        60
OIR    2025130    131400  -11.1000 -137.9900      27.4       351       135        60
OIR    2025130    131400  -11.1000 -138.0000      27.4       351       136        60
OIR    2025130    131400  -11.1000 -138.0100      27.4       351       136        60
OIR    2025130    131400  -11.1000 -138.0200      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.1000 -138.0400      27.4       351       139        60
OIR    2025130    131400  -11.1000 -138.0500      27.4       351       139        60
OIR    2025130    131400  -11.1000 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.1000 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1000 -138.0800      27.4       351       138        60
OIR    2025130    131400  -11.1000 -138.0900      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1000      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1100      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1200      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1300      27.4       351       138        60
OIR    2025130    131400  -11.1000 -138.1400      27.4       351       138        60
OIR    2025130    131400  -11.1000 -138.1500      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1600      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1700      27.4       351       137        60
OIR    2025130    131400  -11.1000 -138.1800      27.4       351       136        60
OIR    2025130    131400  -11.1000 -138.1900      27.4       351       135        60
OIR    2025130    131400  -11.1000 -138.2000      27.4       351       135        60
OIR    2025130    131400  -11.1000 -138.2100      27.4       351       136        60
OIR    2025130    131400  -11.1000 -138.2200      27.3       352       137        60
OIR    2025130    131400  -11.1000 -138.2300      27.3       352       138        60
OIR    2025130    131400  -11.1000 -138.2400      27.3       352       139        60
OIR    2025130    131400  -11.1000 -138.2500      27.2       353       140        60
OIR    2025130    131400  -11.1000 -138.2600      27.0       353       141        60
OIR    2025130    131400  -11.1000 -138.2700      26.9       354       142        60
OIR    2025130    131400  -11.1000 -138.2800      26.7       355       143        60
OIR    2025130    131400  -11.1000 -138.2900      26.6       356       145        60
OIR    2025130    131400  -11.1000 -138.3000      26.5       356       146        60
OIR    2025130    131400  -11.1000 -138.3100      26.4       357       146        60
OIR    2025130    131400  -11.1000 -138.3200      26.3       357       146        60
OIR    2025130    131400  -11.1000 -138.3300      26.2       358       145        60
OIR    2025130    131400  -11.1000 -138.3400      25.9       359       145        60
OIR    2025130    131400  -11.1000 -138.3500      25.7       359       146        60
OIR    2025130    131400  -11.1000 -138.3600      25.6       360       147        60
OIR    2025130    131400  -11.1000 -138.3700      25.4         0       147        60
OIR    2025130    131400  -11.1000 -138.3800      25.3         1       148        60
OIR    2025130    131400  -11.1000 -138.3900      25.2         1       147        60
OIR    2025130    131400  -11.1000 -138.4000      25.2         1       147        60
OIR    2025130    131400  -11.1000 -138.4100      25.1         2       146        60
OIR    2025130    131400  -11.1000 -138.4200      25.1         2       148        60
OIR    2025130    131400  -11.1000 -138.4300      25.0         2       149        60
OIR    2025130    131400  -11.1100 -136.6600      39.8        19       150        60
OIR    2025130    131400  -11.1100 -136.6700      39.8        19       150        60
OIR    2025130    131400  -11.1100 -136.6800      39.9        18       149        60
OIR    2025130    131400  -11.1100 -136.6900      39.9        18       147        60
OIR    2025130    131400  -11.1100 -136.7000      39.9        18       145        60
OIR    2025130    131400  -11.1100 -136.7100      39.9        18       143        60
OIR    2025130    131400  -11.1100 -136.7200      39.9        18       142        60
OIR    2025130    131400  -11.1100 -136.7300      39.9        18       143        60
OIR    2025130    131400  -11.1100 -136.7400      39.9        18       145        60
OIR    2025130    131400  -11.1100 -136.7500      39.9        18       150        60
OIR    2025130    131400  -11.1100 -136.7700      40.0        18       148        60
OIR    2025130    131400  -11.1100 -136.7800      40.0        18       147        60
OIR    2025130    131400  -11.1100 -136.7900      40.0        18       147        60
OIR    2025130    131400  -11.1100 -136.8000      40.1        18       146        60
OIR    2025130    131400  -11.1100 -136.8100      40.1        18       146        60
OIR    2025130    131400  -11.1100 -136.8200      40.2        18       141        60
OIR    2025130    131400  -11.1100 -136.8300      40.2        18       137        60
OIR    2025130    131400  -11.1100 -136.8400      40.3        18       137        60
OIR    2025130    131400  -11.1100 -136.8500      40.4        18       136        60
OIR    2025130    131400  -11.1100 -136.8600      40.4        18       135        60
OIR    2025130    131400  -11.1100 -136.8700      40.5        18       136        60
OIR    2025130    131400  -11.1100 -136.8800      40.5        18       138        60
OIR    2025130    131400  -11.1100 -136.8900      40.5        18       140        60
OIR    2025130    131400  -11.1100 -136.9000      40.5        18       142        60
OIR    2025130    131400  -11.1100 -136.9100      40.4        18       144        60
OIR    2025130    131400  -11.1100 -136.9200      40.4        18       145        60
OIR    2025130    131400  -11.1100 -136.9300      40.4        18       146        60
OIR    2025130    131400  -11.1100 -136.9400      40.4        18       147        60
OIR    2025130    131400  -11.1100 -136.9500      40.3        18       147        60
OIR    2025130    131400  -11.1100 -136.9600      40.0        18       148        60
OIR    2025130    131400  -11.1100 -136.9700      39.0        16       145        60
OIR    2025130    131400  -11.1100 -136.9800      38.7        16       143        60
OIR    2025130    131400  -11.1100 -136.9900      38.2        15       142        60
OIR    2025130    131400  -11.1100 -137.0000      37.9        14       142        60
OIR    2025130    131400  -11.1100 -137.0100      37.8        14       142        60
OIR    2025130    131400  -11.1100 -137.0200      37.7        13       142        60
OIR    2025130    131400  -11.1100 -137.0300      37.6        13       141        60
OIR    2025130    131400  -11.1100 -137.0400      37.6        13       142        60
OIR    2025130    131400  -11.1100 -137.0500      37.6        12       143        60
OIR    2025130    131400  -11.1100 -137.0600      37.6        12       143        60
OIR    2025130    131400  -11.1100 -137.0700      37.6        12       143        60
OIR    2025130    131400  -11.1100 -137.0800      37.6        11       143        60
OIR    2025130    131400  -11.1100 -137.0900      37.7        11       143        60
OIR    2025130    131400  -11.1100 -137.1000      37.7        11       143        60
OIR    2025130    131400  -11.1100 -137.1100      37.8        11       143        60
OIR    2025130    131400  -11.1100 -137.1200      37.9        10       143        60
OIR    2025130    131400  -11.1100 -137.1300      38.0        10       143        60
OIR    2025130    131400  -11.1100 -137.1400      38.1        10       144        60
OIR    2025130    131400  -11.1100 -137.1500      38.1         9       144        60
OIR    2025130    131400  -11.1100 -137.1600      38.2         9       144        60
OIR    2025130    131400  -11.1100 -137.1700      38.3         9       144        60
OIR    2025130    131400  -11.1100 -137.1800      38.3         9       142        60
OIR    2025130    131400  -11.1100 -137.1900      38.4         8       142        60
OIR    2025130    131400  -11.1100 -137.2000      38.5         8       143        60
OIR    2025130    131400  -11.1100 -137.2100      38.6         8       143        60
OIR    2025130    131400  -11.1100 -137.2200      38.8         7       143        60
OIR    2025130    131400  -11.1100 -137.2300      39.0         6       142        60
OIR    2025130    131400  -11.1100 -137.2400      39.2         6       142        60
OIR    2025130    131400  -11.1100 -137.2500      39.5         5       142        60
OIR    2025130    131400  -11.1100 -137.2600      39.7         5       142        60
OIR    2025130    131400  -11.1100 -137.2700      39.9         4       143        60
OIR    2025130    131400  -11.1100 -137.2800      40.0         4       142        60
OIR    2025130    131400  -11.1100 -137.2900      40.2         3       141        60
OIR    2025130    131400  -11.1100 -137.3000      40.3         3       139        60
OIR    2025130    131400  -11.1100 -137.3100      40.3         2       138        60
OIR    2025130    131400  -11.1100 -137.3200      40.4         2       138        60
OIR    2025130    131400  -11.1100 -137.3300      40.4         1       137        60
OIR    2025130    131400  -11.1100 -137.3400      40.3         0       135        60
OIR    2025130    131400  -11.1100 -137.3500      40.2       360       135        60
OIR    2025130    131400  -11.1100 -137.3600      40.1       359       135        60
OIR    2025130    131400  -11.1100 -137.3700      40.0       358       135        60
OIR    2025130    131400  -11.1100 -137.3800      39.9       358       135        60
OIR    2025130    131400  -11.1100 -137.3900      39.8       357       134        60
OIR    2025130    131400  -11.1100 -137.4000      39.8       357       133        60
OIR    2025130    131400  -11.1100 -137.4100      39.8       357       131        60
OIR    2025130    131400  -11.1100 -137.4200      39.8       357       129        60
OIR    2025130    131400  -11.1100 -137.4300      39.8       356       128        60
OIR    2025130    131400  -11.1100 -137.4400      39.8       356       128        60
OIR    2025130    131400  -11.1100 -137.4500      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.4600      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.4700      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.4800      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.4900      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.5000      39.8       356       129        60
OIR    2025130    131400  -11.1100 -137.5100      39.8       356       130        60
OIR    2025130    131400  -11.1100 -137.5200      39.8       356       130        60
OIR    2025130    131400  -11.1100 -137.5300      39.8       356       131        60
OIR    2025130    131400  -11.1100 -137.5400      39.8       356       131        60
OIR    2025130    131400  -11.1100 -137.5500      39.8       356       133        60
OIR    2025130    131400  -11.1100 -137.5600      39.7       356       137        60
OIR    2025130    131400  -11.1100 -137.5700      39.7       356       139        60
OIR    2025130    131400  -11.1100 -137.5800      39.6       356       141        60
OIR    2025130    131400  -11.1100 -137.5900      39.6       356       142        60
OIR    2025130    131400  -11.1100 -137.6000      39.5       356       143        60
OIR    2025130    131400  -11.1100 -137.6100      39.4       355       143        60
OIR    2025130    131400  -11.1100 -137.6200      39.2       355       144        60
OIR    2025130    131400  -11.1100 -137.6300      39.0       355       143        60
OIR    2025130    131400  -11.1100 -137.6400      38.5       355       142        60
OIR    2025130    131400  -11.1100 -137.6500      37.6       354       143        60
OIR    2025130    131400  -11.1100 -137.6600      36.1       354       144        60
OIR    2025130    131400  -11.1100 -137.6700      34.1       352       144        60
OIR    2025130    131400  -11.1100 -137.6800      33.0       351       143        60
OIR    2025130    131400  -11.1100 -137.6900      32.3       350       141        60
OIR    2025130    131400  -11.1100 -137.7000      31.9       350       139        60
OIR    2025130    131400  -11.1100 -137.7100      31.6       350       139        60
OIR    2025130    131400  -11.1100 -137.7200      31.4       350       139        60
OIR    2025130    131400  -11.1100 -137.7300      31.2       350       139        60
OIR    2025130    131400  -11.1100 -137.7400      31.0       350       138        60
OIR    2025130    131400  -11.1100 -137.7500      30.7       350       138        60
OIR    2025130    131400  -11.1100 -137.7600      29.9       350       136        60
OIR    2025130    131400  -11.1100 -137.7700      29.2       350       135        60
OIR    2025130    131400  -11.1100 -137.7800      28.5       350       134        60
OIR    2025130    131400  -11.1100 -137.7900      28.0       350       133        60
OIR    2025130    131400  -11.1100 -137.8000      27.8       350       134        60
OIR    2025130    131400  -11.1100 -137.8100      27.7       350       135        60
OIR    2025130    131400  -11.1100 -137.8200      27.7       350       135        60
OIR    2025130    131400  -11.1100 -137.8300      27.6       350       135        60
OIR    2025130    131400  -11.1100 -137.8400      27.6       350       134        60
OIR    2025130    131400  -11.1100 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.1100 -137.8600      27.6       350       133        60
OIR    2025130    131400  -11.1100 -137.8700      27.6       350       133        60
OIR    2025130    131400  -11.1100 -137.8800      27.6       350       133        60
OIR    2025130    131400  -11.1100 -137.8900      27.5       350       133        60
OIR    2025130    131400  -11.1100 -137.9000      27.5       350       133        60
OIR    2025130    131400  -11.1100 -137.9100      27.5       350       132        60
OIR    2025130    131400  -11.1100 -137.9200      27.5       350       132        60
OIR    2025130    131400  -11.1100 -137.9300      27.5       350       133        60
OIR    2025130    131400  -11.1100 -137.9400      27.5       350       134        60
OIR    2025130    131400  -11.1100 -137.9500      27.5       350       134        60
OIR    2025130    131400  -11.1100 -137.9600      27.4       350       134        60
OIR    2025130    131400  -11.1100 -137.9700      27.4       350       133        60
OIR    2025130    131400  -11.1100 -137.9800      27.4       351       133        60
OIR    2025130    131400  -11.1100 -137.9900      27.4       351       133        60
OIR    2025130    131400  -11.1100 -138.0000      27.4       351       134        60
OIR    2025130    131400  -11.1100 -138.0100      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.0200      27.4       351       137        60
OIR    2025130    131400  -11.1100 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.1100 -138.0400      27.4       351       139        60
OIR    2025130    131400  -11.1100 -138.0500      27.4       351       139        60
OIR    2025130    131400  -11.1100 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.1100 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1100 -138.0800      27.4       351       137        60
OIR    2025130    131400  -11.1100 -138.0900      27.4       351       137        60
OIR    2025130    131400  -11.1100 -138.1000      27.4       351       137        60
OIR    2025130    131400  -11.1100 -138.1100      27.4       351       136        60
OIR    2025130    131400  -11.1100 -138.1200      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.1300      27.4       351       136        60
OIR    2025130    131400  -11.1100 -138.1400      27.4       351       137        60
OIR    2025130    131400  -11.1100 -138.1500      27.4       351       136        60
OIR    2025130    131400  -11.1100 -138.1600      27.4       351       136        60
OIR    2025130    131400  -11.1100 -138.1700      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.1800      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.1900      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.2000      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.2100      27.4       351       135        60
OIR    2025130    131400  -11.1100 -138.2200      27.3       351       137        60
OIR    2025130    131400  -11.1100 -138.2300      27.3       352       138        60
OIR    2025130    131400  -11.1100 -138.2400      27.2       352       139        60
OIR    2025130    131400  -11.1100 -138.2500      27.1       352       140        60
OIR    2025130    131400  -11.1100 -138.2600      27.0       353       142        60
OIR    2025130    131400  -11.1100 -138.2700      26.9       353       143        60
OIR    2025130    131400  -11.1100 -138.2800      26.7       354       144        60
OIR    2025130    131400  -11.1100 -138.2900      26.6       355       145        60
OIR    2025130    131400  -11.1100 -138.3000      26.5       356       146        60
OIR    2025130    131400  -11.1100 -138.3100      26.4       357       146        60
OIR    2025130    131400  -11.1100 -138.3200      26.3       357       147        60
OIR    2025130    131400  -11.1100 -138.3300      26.1       358       148        60
OIR    2025130    131400  -11.1100 -138.3500      25.6       359       148        60
OIR    2025130    131400  -11.1100 -138.3600      25.4       360       148        60
OIR    2025130    131400  -11.1100 -138.3700      25.3         0       148        60
OIR    2025130    131400  -11.1100 -138.3800      25.2         1       149        60
OIR    2025130    131400  -11.1100 -138.3900      25.1         1       147        60
OIR    2025130    131400  -11.1100 -138.4000      25.1         1       147        60
OIR    2025130    131400  -11.1100 -138.4100      25.0         2       147        60
OIR    2025130    131400  -11.1100 -138.4200      25.0         2       148        60
OIR    2025130    131400  -11.1100 -138.4300      24.9         2       148        60
OIR    2025130    131400  -11.1100 -138.4700      24.9         3       150        60
OIR    2025130    131400  -11.1200 -136.6700      39.8        19       151        60
OIR    2025130    131400  -11.1200 -136.6800      39.8        18       151        60
OIR    2025130    131400  -11.1200 -136.6900      39.8        18       149        60
OIR    2025130    131400  -11.1200 -136.7000      39.9        18       147        60
OIR    2025130    131400  -11.1200 -136.7100      39.9        18       146        60
OIR    2025130    131400  -11.1200 -136.7200      39.9        18       144        60
OIR    2025130    131400  -11.1200 -136.7300      39.9        18       142        60
OIR    2025130    131400  -11.1200 -136.7400      39.9        18       144        60
OIR    2025130    131400  -11.1200 -136.7500      39.9        18       148        60
OIR    2025130    131400  -11.1200 -136.7600      39.9        18       151        60
OIR    2025130    131400  -11.1200 -136.7800      40.0        18       150        60
OIR    2025130    131400  -11.1200 -136.7900      40.0        18       148        60
OIR    2025130    131400  -11.1200 -136.8000      40.0        18       148        60
OIR    2025130    131400  -11.1200 -136.8100      40.0        18       148        60
OIR    2025130    131400  -11.1200 -136.8200      40.0        18       143        60
OIR    2025130    131400  -11.1200 -136.8300      40.1        18       139        60
OIR    2025130    131400  -11.1200 -136.8400      40.1        18       139        60
OIR    2025130    131400  -11.1200 -136.8500      40.2        18       138        60
OIR    2025130    131400  -11.1200 -136.8600      40.3        18       135        60
OIR    2025130    131400  -11.1200 -136.8700      40.4        18       134        60
OIR    2025130    131400  -11.1200 -136.8800      40.4        18       137        60
OIR    2025130    131400  -11.1200 -136.8900      40.4        18       139        60
OIR    2025130    131400  -11.1200 -136.9000      40.4        18       141        60
OIR    2025130    131400  -11.1200 -136.9100      40.4        18       143        60
OIR    2025130    131400  -11.1200 -136.9200      40.4        18       144        60
OIR    2025130    131400  -11.1200 -136.9300      40.4        18       146        60
OIR    2025130    131400  -11.1200 -136.9400      40.3        18       147        60
OIR    2025130    131400  -11.1200 -136.9500      40.2        18       149        60
OIR    2025130    131400  -11.1200 -136.9600      40.0        18       150        60
OIR    2025130    131400  -11.1200 -136.9700      38.9        16       148        60
OIR    2025130    131400  -11.1200 -136.9800      38.4        15       146        60
OIR    2025130    131400  -11.1200 -136.9900      38.0        15       144        60
OIR    2025130    131400  -11.1200 -137.0000      37.7        14       143        60
OIR    2025130    131400  -11.1200 -137.0100      37.6        14       143        60
OIR    2025130    131400  -11.1200 -137.0200      37.5        13       143        60
OIR    2025130    131400  -11.1200 -137.0300      37.5        13       143        60
OIR    2025130    131400  -11.1200 -137.0400      37.5        13       144        60
OIR    2025130    131400  -11.1200 -137.0500      37.4        12       144        60
OIR    2025130    131400  -11.1200 -137.0600      37.4        12       144        60
OIR    2025130    131400  -11.1200 -137.0700      37.4        12       144        60
OIR    2025130    131400  -11.1200 -137.0800      37.4        11       144        60
OIR    2025130    131400  -11.1200 -137.0900      37.5        11       145        60
OIR    2025130    131400  -11.1200 -137.1000      37.5        11       145        60
OIR    2025130    131400  -11.1200 -137.1100      37.6        11       144        60
OIR    2025130    131400  -11.1200 -137.1200      37.7        10       143        60
OIR    2025130    131400  -11.1200 -137.1300      37.8        10       143        60
OIR    2025130    131400  -11.1200 -137.1400      37.9        10       145        60
OIR    2025130    131400  -11.1200 -137.1500      38.0         9       145        60
OIR    2025130    131400  -11.1200 -137.1600      38.0         9       144        60
OIR    2025130    131400  -11.1200 -137.1700      38.1         9       144        60
OIR    2025130    131400  -11.1200 -137.1800      38.2         8       144        60
OIR    2025130    131400  -11.1200 -137.1900      38.3         8       144        60
OIR    2025130    131400  -11.1200 -137.2000      38.4         8       144        60
OIR    2025130    131400  -11.1200 -137.2100      38.5         7       145        60
OIR    2025130    131400  -11.1200 -137.2200      38.6         7       146        60
OIR    2025130    131400  -11.1200 -137.2300      38.8         6       144        60
OIR    2025130    131400  -11.1200 -137.2400      39.0         6       143        60
OIR    2025130    131400  -11.1200 -137.2500      39.2         5       142        60
OIR    2025130    131400  -11.1200 -137.2600      39.4         4       142        60
OIR    2025130    131400  -11.1200 -137.2700      39.6         4       143        60
OIR    2025130    131400  -11.1200 -137.2800      39.7         3       142        60
OIR    2025130    131400  -11.1200 -137.2900      39.9         3       141        60
OIR    2025130    131400  -11.1200 -137.3000      40.0         2       139        60
OIR    2025130    131400  -11.1200 -137.3100      40.0         2       138        60
OIR    2025130    131400  -11.1200 -137.3200      40.1         1       138        60
OIR    2025130    131400  -11.1200 -137.3300      40.1         1       137        60
OIR    2025130    131400  -11.1200 -137.3400      40.1         0       136        60
OIR    2025130    131400  -11.1200 -137.3500      40.2       359       137        60
OIR    2025130    131400  -11.1200 -137.3600      40.1       359       139        60
OIR    2025130    131400  -11.1200 -137.3700      40.0       358       139        60
OIR    2025130    131400  -11.1200 -137.3800      39.9       357       139        60
OIR    2025130    131400  -11.1200 -137.3900      39.9       357       137        60
OIR    2025130    131400  -11.1200 -137.4000      39.8       357       135        60
OIR    2025130    131400  -11.1200 -137.4100      39.8       357       132        60
OIR    2025130    131400  -11.1200 -137.4200      39.8       356       130        60
OIR    2025130    131400  -11.1200 -137.4300      39.8       356       129        60
OIR    2025130    131400  -11.1200 -137.4400      39.8       356       128        60
OIR    2025130    131400  -11.1200 -137.4500      39.8       356       129        60
OIR    2025130    131400  -11.1200 -137.4600      39.8       356       130        60
OIR    2025130    131400  -11.1200 -137.4700      39.8       356       129        60
OIR    2025130    131400  -11.1200 -137.4800      39.8       356       129        60
OIR    2025130    131400  -11.1200 -137.4900      39.8       356       129        60
OIR    2025130    131400  -11.1200 -137.5000      39.8       356       130        60
OIR    2025130    131400  -11.1200 -137.5100      39.8       356       130        60
OIR    2025130    131400  -11.1200 -137.5200      39.8       356       131        60
OIR    2025130    131400  -11.1200 -137.5300      39.8       356       132        60
OIR    2025130    131400  -11.1200 -137.5400      39.8       356       132        60
OIR    2025130    131400  -11.1200 -137.5500      39.7       356       133        60
OIR    2025130    131400  -11.1200 -137.5600      39.7       356       137        60
OIR    2025130    131400  -11.1200 -137.5700      39.7       356       139        60
OIR    2025130    131400  -11.1200 -137.5800      39.6       356       140        60
OIR    2025130    131400  -11.1200 -137.5900      39.6       356       141        60
OIR    2025130    131400  -11.1200 -137.6000      39.5       356       142        60
OIR    2025130    131400  -11.1200 -137.6100      39.5       356       142        60
OIR    2025130    131400  -11.1200 -137.6200      39.4       355       142        60
OIR    2025130    131400  -11.1200 -137.6300      39.2       355       142        60
OIR    2025130    131400  -11.1200 -137.6400      38.8       355       142        60
OIR    2025130    131400  -11.1200 -137.6500      38.0       354       143        60
OIR    2025130    131400  -11.1200 -137.6600      36.6       354       144        60
OIR    2025130    131400  -11.1200 -137.6700      34.8       352       146        60
OIR    2025130    131400  -11.1200 -137.6800      33.3       351       145        60
OIR    2025130    131400  -11.1200 -137.6900      32.4       350       143        60
OIR    2025130    131400  -11.1200 -137.7000      31.9       350       142        60
OIR    2025130    131400  -11.1200 -137.7100      31.7       350       140        60
OIR    2025130    131400  -11.1200 -137.7200      31.4       350       140        60
OIR    2025130    131400  -11.1200 -137.7300      31.2       350       141        60
OIR    2025130    131400  -11.1200 -137.7400      31.0       350       140        60
OIR    2025130    131400  -11.1200 -137.7500      30.7       350       139        60
OIR    2025130    131400  -11.1200 -137.7600      30.0       350       137        60
OIR    2025130    131400  -11.1200 -137.7700      29.1       350       135        60
OIR    2025130    131400  -11.1200 -137.7800      28.4       350       134        60
OIR    2025130    131400  -11.1200 -137.7900      28.0       350       133        60
OIR    2025130    131400  -11.1200 -137.8000      27.8       350       135        60
OIR    2025130    131400  -11.1200 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.1200 -137.8200      27.7       350       137        60
OIR    2025130    131400  -11.1200 -137.8300      27.6       350       137        60
OIR    2025130    131400  -11.1200 -137.8400      27.6       350       136        60
OIR    2025130    131400  -11.1200 -137.8500      27.6       350       135        60
OIR    2025130    131400  -11.1200 -137.8600      27.6       350       134        60
OIR    2025130    131400  -11.1200 -137.8700      27.6       350       134        60
OIR    2025130    131400  -11.1200 -137.8800      27.6       350       134        60
OIR    2025130    131400  -11.1200 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1200 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.1200 -137.9100      27.5       350       132        60
OIR    2025130    131400  -11.1200 -137.9200      27.5       350       132        60
OIR    2025130    131400  -11.1200 -137.9300      27.5       350       134        60
OIR    2025130    131400  -11.1200 -137.9400      27.5       350       134        60
OIR    2025130    131400  -11.1200 -137.9500      27.5       350       134        60
OIR    2025130    131400  -11.1200 -137.9600      27.4       350       133        60
OIR    2025130    131400  -11.1200 -137.9700      27.4       350       132        60
OIR    2025130    131400  -11.1200 -137.9800      27.4       350       132        60
OIR    2025130    131400  -11.1200 -137.9900      27.4       351       132        60
OIR    2025130    131400  -11.1200 -138.0000      27.4       351       133        60
OIR    2025130    131400  -11.1200 -138.0100      27.4       351       134        60
OIR    2025130    131400  -11.1200 -138.0200      27.4       351       137        60
OIR    2025130    131400  -11.1200 -138.0300      27.4       351       139        60
OIR    2025130    131400  -11.1200 -138.0400      27.4       351       140        60
OIR    2025130    131400  -11.1200 -138.0500      27.4       351       140        60
OIR    2025130    131400  -11.1200 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.1200 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1200 -138.0800      27.4       351       137        60
OIR    2025130    131400  -11.1200 -138.0900      27.4       351       136        60
OIR    2025130    131400  -11.1200 -138.1000      27.4       351       136        60
OIR    2025130    131400  -11.1200 -138.1100      27.4       351       135        60
OIR    2025130    131400  -11.1200 -138.1200      27.4       351       134        60
OIR    2025130    131400  -11.1200 -138.1300      27.4       351       135        60
OIR    2025130    131400  -11.1200 -138.1400      27.4       351       136        60
OIR    2025130    131400  -11.1200 -138.1500      27.4       351       135        60
OIR    2025130    131400  -11.1200 -138.1600      27.4       351       135        60
OIR    2025130    131400  -11.1200 -138.1700      27.4       351       134        60
OIR    2025130    131400  -11.1200 -138.1800      27.4       351       134        60
OIR    2025130    131400  -11.1200 -138.1900      27.4       351       134        60
OIR    2025130    131400  -11.1200 -138.2000      27.4       351       135        60
OIR    2025130    131400  -11.1200 -138.2100      27.3       351       136        60
OIR    2025130    131400  -11.1200 -138.2200      27.3       351       137        60
OIR    2025130    131400  -11.1200 -138.2300      27.3       351       138        60
OIR    2025130    131400  -11.1200 -138.2400      27.2       352       139        60
OIR    2025130    131400  -11.1200 -138.2500      27.1       352       140        60
OIR    2025130    131400  -11.1200 -138.2600      27.1       352       142        60
OIR    2025130    131400  -11.1200 -138.2700      27.0       353       144        60
OIR    2025130    131400  -11.1200 -138.2800      26.8       354       144        60
OIR    2025130    131400  -11.1200 -138.2900      26.7       355       145        60
OIR    2025130    131400  -11.1200 -138.3000      26.6       355       145        60
OIR    2025130    131400  -11.1200 -138.3100      26.4       356       146        60
OIR    2025130    131400  -11.1200 -138.3200      26.2       357       147        60
OIR    2025130    131400  -11.1200 -138.3600      25.3       360       148        60
OIR    2025130    131400  -11.1200 -138.3700      25.2         0       149        60
OIR    2025130    131400  -11.1200 -138.3800      25.1         1       149        60
OIR    2025130    131400  -11.1200 -138.3900      25.0         1       148        60
OIR    2025130    131400  -11.1200 -138.4000      25.0         1       148        60
OIR    2025130    131400  -11.1200 -138.4100      24.9         2       148        60
OIR    2025130    131400  -11.1200 -138.4200      24.9         2       149        60
OIR    2025130    131400  -11.1200 -138.4300      24.9         2       149        60
OIR    2025130    131400  -11.1200 -138.4800      24.8         3       150        60
OIR    2025130    131400  -11.1300 -136.7000      39.8        18       150        60
OIR    2025130    131400  -11.1300 -136.7100      39.9        18       148        60
OIR    2025130    131400  -11.1300 -136.7200      39.9        18       147        60
OIR    2025130    131400  -11.1300 -136.7300      39.9        18       144        60
OIR    2025130    131400  -11.1300 -136.7400      39.9        18       145        60
OIR    2025130    131400  -11.1300 -136.7500      39.9        18       150        60
OIR    2025130    131400  -11.1300 -136.8000      40.0        18       150        60
OIR    2025130    131400  -11.1300 -136.8100      40.0        18       149        60
OIR    2025130    131400  -11.1300 -136.8200      40.0        18       146        60
OIR    2025130    131400  -11.1300 -136.8300      40.0        18       142        60
OIR    2025130    131400  -11.1300 -136.8400      40.0        18       141        60
OIR    2025130    131400  -11.1300 -136.8500      40.1        18       140        60
OIR    2025130    131400  -11.1300 -136.8600      40.1        18       139        60
OIR    2025130    131400  -11.1300 -136.8700      40.2        18       139        60
OIR    2025130    131400  -11.1300 -136.8800      40.3        18       139        60
OIR    2025130    131400  -11.1300 -136.8900      40.4        18       139        60
OIR    2025130    131400  -11.1300 -136.9000      40.4        18       139        60
OIR    2025130    131400  -11.1300 -136.9100      40.4        18       141        60
OIR    2025130    131400  -11.1300 -136.9200      40.4        18       145        60
OIR    2025130    131400  -11.1300 -136.9300      40.3        18       145        60
OIR    2025130    131400  -11.1300 -136.9400      40.3        18       146        60
OIR    2025130    131400  -11.1300 -136.9500      40.1        18       149        60
OIR    2025130    131400  -11.1300 -136.9700      38.7        16       148        60
OIR    2025130    131400  -11.1300 -136.9800      38.0        15       146        60
OIR    2025130    131400  -11.1300 -136.9900      37.7        14       144        60
OIR    2025130    131400  -11.1300 -137.0000      37.5        14       143        60
OIR    2025130    131400  -11.1300 -137.0100      37.4        14       143        60
OIR    2025130    131400  -11.1300 -137.0200      37.4        13       144        60
OIR    2025130    131400  -11.1300 -137.0300      37.3        13       144        60
OIR    2025130    131400  -11.1300 -137.0400      37.3        13       145        60
OIR    2025130    131400  -11.1300 -137.0500      37.2        12       146        60
OIR    2025130    131400  -11.1300 -137.0600      37.2        12       145        60
OIR    2025130    131400  -11.1300 -137.0700      37.2        12       144        60
OIR    2025130    131400  -11.1300 -137.0800      37.2        11       146        60
OIR    2025130    131400  -11.1300 -137.0900      37.3        11       147        60
OIR    2025130    131400  -11.1300 -137.1000      37.3        11       147        60
OIR    2025130    131400  -11.1300 -137.1100      37.4        10       146        60
OIR    2025130    131400  -11.1300 -137.1200      37.5        10       145        60
OIR    2025130    131400  -11.1300 -137.1300      37.6        10       145        60
OIR    2025130    131400  -11.1300 -137.1400      37.7        10       144        60
OIR    2025130    131400  -11.1300 -137.1500      37.8         9       145        60
OIR    2025130    131400  -11.1300 -137.1600      37.9         9       145        60
OIR    2025130    131400  -11.1300 -137.1700      37.9         9       145        60
OIR    2025130    131400  -11.1300 -137.1800      38.0         8       145        60
OIR    2025130    131400  -11.1300 -137.1900      38.1         8       145        60
OIR    2025130    131400  -11.1300 -137.2000      38.2         8       146        60
OIR    2025130    131400  -11.1300 -137.2100      38.3         7       147        60
OIR    2025130    131400  -11.1300 -137.2200      38.4         7       147        60
OIR    2025130    131400  -11.1300 -137.2300      38.6         6       146        60
OIR    2025130    131400  -11.1300 -137.2400      38.7         5       144        60
OIR    2025130    131400  -11.1300 -137.2500      38.9         5       143        60
OIR    2025130    131400  -11.1300 -137.2600      39.0         4       143        60
OIR    2025130    131400  -11.1300 -137.2700      39.2         4       144        60
OIR    2025130    131400  -11.1300 -137.2800      39.3         3       144        60
OIR    2025130    131400  -11.1300 -137.2900      39.5         3       143        60
OIR    2025130    131400  -11.1300 -137.3000      39.6         2       141        60
OIR    2025130    131400  -11.1300 -137.3100      39.8         1       140        60
OIR    2025130    131400  -11.1300 -137.3200      39.8         1       139        60
OIR    2025130    131400  -11.1300 -137.3300      39.9         0       139        60
OIR    2025130    131400  -11.1300 -137.3400      39.9       360       139        60
OIR    2025130    131400  -11.1300 -137.3500      40.0       359       139        60
OIR    2025130    131400  -11.1300 -137.3600      40.1       358       141        60
OIR    2025130    131400  -11.1300 -137.3700      40.0       357       141        60
OIR    2025130    131400  -11.1300 -137.3800      40.0       357       142        60
OIR    2025130    131400  -11.1300 -137.3900      39.9       357       140        60
OIR    2025130    131400  -11.1300 -137.4000      39.8       357       136        60
OIR    2025130    131400  -11.1300 -137.4100      39.8       357       134        60
OIR    2025130    131400  -11.1300 -137.4200      39.8       356       132        60
OIR    2025130    131400  -11.1300 -137.4300      39.8       356       132        60
OIR    2025130    131400  -11.1300 -137.4400      39.8       356       131        60
OIR    2025130    131400  -11.1300 -137.4500      39.8       356       132        60
OIR    2025130    131400  -11.1300 -137.4600      39.8       356       132        60
OIR    2025130    131400  -11.1300 -137.4700      39.8       356       131        60
OIR    2025130    131400  -11.1300 -137.4800      39.8       356       131        60
OIR    2025130    131400  -11.1300 -137.4900      39.8       356       131        60
OIR    2025130    131400  -11.1300 -137.5000      39.8       356       132        60
OIR    2025130    131400  -11.1300 -137.5100      39.8       356       133        60
OIR    2025130    131400  -11.1300 -137.5200      39.8       356       133        60
OIR    2025130    131400  -11.1300 -137.5300      39.8       356       133        60
OIR    2025130    131400  -11.1300 -137.5400      39.8       356       134        60
OIR    2025130    131400  -11.1300 -137.5500      39.7       356       135        60
OIR    2025130    131400  -11.1300 -137.5600      39.7       356       138        60
OIR    2025130    131400  -11.1300 -137.5700      39.7       356       140        60
OIR    2025130    131400  -11.1300 -137.5800      39.6       356       141        60
OIR    2025130    131400  -11.1300 -137.5900      39.6       356       142        60
OIR    2025130    131400  -11.1300 -137.6000      39.6       356       140        60
OIR    2025130    131400  -11.1300 -137.6100      39.5       356       142        60
OIR    2025130    131400  -11.1300 -137.6200      39.4       355       145        60
OIR    2025130    131400  -11.1300 -137.6300      39.3       355       145        60
OIR    2025130    131400  -11.1300 -137.6400      38.9       355       145        60
OIR    2025130    131400  -11.1300 -137.6500      38.1       354       145        60
OIR    2025130    131400  -11.1300 -137.6600      37.0       353       146        60
OIR    2025130    131400  -11.1300 -137.6700      35.5       352       149        60
OIR    2025130    131400  -11.1300 -137.6800      33.9       351       149        60
OIR    2025130    131400  -11.1300 -137.6900      32.6       350       148        60
OIR    2025130    131400  -11.1300 -137.7000      32.0       350       145        60
OIR    2025130    131400  -11.1300 -137.7100      31.7       350       142        60
OIR    2025130    131400  -11.1300 -137.7200      31.5       350       141        60
OIR    2025130    131400  -11.1300 -137.7300      31.3       350       140        60
OIR    2025130    131400  -11.1300 -137.7400      31.0       350       140        60
OIR    2025130    131400  -11.1300 -137.7500      30.7       350       139        60
OIR    2025130    131400  -11.1300 -137.7600      29.9       350       137        60
OIR    2025130    131400  -11.1300 -137.7700      29.0       350       135        60
OIR    2025130    131400  -11.1300 -137.7800      28.3       350       134        60
OIR    2025130    131400  -11.1300 -137.7900      27.9       350       134        60
OIR    2025130    131400  -11.1300 -137.8000      27.7       350       136        60
OIR    2025130    131400  -11.1300 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.1300 -137.8200      27.7       350       137        60
OIR    2025130    131400  -11.1300 -137.8300      27.6       350       137        60
OIR    2025130    131400  -11.1300 -137.8400      27.6       350       136        60
OIR    2025130    131400  -11.1300 -137.8500      27.6       350       135        60
OIR    2025130    131400  -11.1300 -137.8600      27.6       350       134        60
OIR    2025130    131400  -11.1300 -137.8700      27.6       350       134        60
OIR    2025130    131400  -11.1300 -137.8800      27.6       350       134        60
OIR    2025130    131400  -11.1300 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1300 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.1300 -137.9100      27.5       350       133        60
OIR    2025130    131400  -11.1300 -137.9200      27.5       350       132        60
OIR    2025130    131400  -11.1300 -137.9300      27.5       350       134        60
OIR    2025130    131400  -11.1300 -137.9400      27.5       350       134        60
OIR    2025130    131400  -11.1300 -137.9500      27.5       350       134        60
OIR    2025130    131400  -11.1300 -137.9600      27.4       350       134        60
OIR    2025130    131400  -11.1300 -137.9700      27.4       350       133        60
OIR    2025130    131400  -11.1300 -137.9800      27.4       350       132        60
OIR    2025130    131400  -11.1300 -137.9900      27.4       350       132        60
OIR    2025130    131400  -11.1300 -138.0000      27.4       351       133        60
OIR    2025130    131400  -11.1300 -138.0100      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.0200      27.4       351       136        60
OIR    2025130    131400  -11.1300 -138.0300      27.4       351       138        60
OIR    2025130    131400  -11.1300 -138.0400      27.4       351       140        60
OIR    2025130    131400  -11.1300 -138.0500      27.4       351       140        60
OIR    2025130    131400  -11.1300 -138.0600      27.4       351       139        60
OIR    2025130    131400  -11.1300 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1300 -138.0800      27.4       351       137        60
OIR    2025130    131400  -11.1300 -138.0900      27.4       351       135        60
OIR    2025130    131400  -11.1300 -138.1000      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.1100      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.1200      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.1300      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.1400      27.4       351       135        60
OIR    2025130    131400  -11.1300 -138.1500      27.4       351       136        60
OIR    2025130    131400  -11.1300 -138.1600      27.4       351       135        60
OIR    2025130    131400  -11.1300 -138.1700      27.4       351       134        60
OIR    2025130    131400  -11.1300 -138.1800      27.4       351       135        60
OIR    2025130    131400  -11.1300 -138.1900      27.4       351       136        60
OIR    2025130    131400  -11.1300 -138.2000      27.3       351       137        60
OIR    2025130    131400  -11.1300 -138.2100      27.3       351       137        60
OIR    2025130    131400  -11.1300 -138.2200      27.3       351       138        60
OIR    2025130    131400  -11.1300 -138.2300      27.3       351       139        60
OIR    2025130    131400  -11.1300 -138.2400      27.2       351       140        60
OIR    2025130    131400  -11.1300 -138.2500      27.2       352       141        60
OIR    2025130    131400  -11.1300 -138.2600      27.1       352       142        60
OIR    2025130    131400  -11.1300 -138.2700      27.0       352       144        60
OIR    2025130    131400  -11.1300 -138.2800      26.9       353       145        60
OIR    2025130    131400  -11.1300 -138.2900      26.8       354       145        60
OIR    2025130    131400  -11.1300 -138.3000      26.6       355       144        60
OIR    2025130    131400  -11.1300 -138.3100      26.4       356       145        60
OIR    2025130    131400  -11.1300 -138.3200      26.1       357       147        60
OIR    2025130    131400  -11.1300 -138.3300      25.8       357       150        60
OIR    2025130    131400  -11.1300 -138.3700      25.1         0       149        60
OIR    2025130    131400  -11.1300 -138.3800      25.0         1       148        60
OIR    2025130    131400  -11.1300 -138.3900      24.9         1       148        60
OIR    2025130    131400  -11.1300 -138.4000      24.9         1       149        60
OIR    2025130    131400  -11.1400 -136.7100      39.8        18       151        60
OIR    2025130    131400  -11.1400 -136.7200      39.9        18       150        60
OIR    2025130    131400  -11.1400 -136.7300      39.9        18       146        60
OIR    2025130    131400  -11.1400 -136.7400      39.9        18       147        60
OIR    2025130    131400  -11.1400 -136.8100      40.0        18       151        60
OIR    2025130    131400  -11.1400 -136.8200      40.0        18       148        60
OIR    2025130    131400  -11.1400 -136.8300      40.0        18       146        60
OIR    2025130    131400  -11.1400 -136.8400      40.0        18       143        60
OIR    2025130    131400  -11.1400 -136.8500      40.0        18       142        60
OIR    2025130    131400  -11.1400 -136.8600      40.0        18       144        60
OIR    2025130    131400  -11.1400 -136.8700      40.1        18       144        60
OIR    2025130    131400  -11.1400 -136.8800      40.2        18       142        60
OIR    2025130    131400  -11.1400 -136.8900      40.3        18       140        60
OIR    2025130    131400  -11.1400 -136.9000      40.3        18       139        60
OIR    2025130    131400  -11.1400 -136.9100      40.3        18       141        60
OIR    2025130    131400  -11.1400 -136.9200      40.3        18       145        60
OIR    2025130    131400  -11.1400 -136.9300      40.3        18       145        60
OIR    2025130    131400  -11.1400 -136.9400      40.2        18       145        60
OIR    2025130    131400  -11.1400 -136.9500      39.9        18       148        60
OIR    2025130    131400  -11.1400 -136.9700      38.4        16       148        60
OIR    2025130    131400  -11.1400 -136.9800      37.8        15       145        60
OIR    2025130    131400  -11.1400 -136.9900      37.5        14       144        60
OIR    2025130    131400  -11.1400 -137.0000      37.3        14       143        60
OIR    2025130    131400  -11.1400 -137.0100      37.3        14       144        60
OIR    2025130    131400  -11.1400 -137.0200      37.2        13       144        60
OIR    2025130    131400  -11.1400 -137.0300      37.1        13       145        60
OIR    2025130    131400  -11.1400 -137.0400      37.1        13       146        60
OIR    2025130    131400  -11.1400 -137.0500      37.1        12       147        60
OIR    2025130    131400  -11.1400 -137.0600      37.0        12       146        60
OIR    2025130    131400  -11.1400 -137.0700      37.0        12       145        60
OIR    2025130    131400  -11.1400 -137.0800      37.1        11       147        60
OIR    2025130    131400  -11.1400 -137.0900      37.1        11       149        60
OIR    2025130    131400  -11.1400 -137.1000      37.2        11       148        60
OIR    2025130    131400  -11.1400 -137.1100      37.2        10       148        60
OIR    2025130    131400  -11.1400 -137.1200      37.3        10       147        60
OIR    2025130    131400  -11.1400 -137.1300      37.3        10       146        60
OIR    2025130    131400  -11.1400 -137.1400      37.4         9       144        60
OIR    2025130    131400  -11.1400 -137.1500      37.5         9       145        60
OIR    2025130    131400  -11.1400 -137.1600      37.6         9       146        60
OIR    2025130    131400  -11.1400 -137.1700      37.7         8       145        60
OIR    2025130    131400  -11.1400 -137.1800      37.8         8       145        60
OIR    2025130    131400  -11.1400 -137.1900      37.9         8       147        60
OIR    2025130    131400  -11.1400 -137.2000      38.0         7       148        60
OIR    2025130    131400  -11.1400 -137.2100      38.1         7       148        60
OIR    2025130    131400  -11.1400 -137.2200      38.2         6       148        60
OIR    2025130    131400  -11.1400 -137.2300      38.4         6       147        60
OIR    2025130    131400  -11.1400 -137.2400      38.4         5       146        60
OIR    2025130    131400  -11.1400 -137.2500      38.5         5       144        60
OIR    2025130    131400  -11.1400 -137.2600      38.7         4       144        60
OIR    2025130    131400  -11.1400 -137.2700      38.8         4       144        60
OIR    2025130    131400  -11.1400 -137.2800      38.9         3       145        60
OIR    2025130    131400  -11.1400 -137.2900      39.1         2       146        60
OIR    2025130    131400  -11.1400 -137.3000      39.3         2       143        60
OIR    2025130    131400  -11.1400 -137.3100      39.4         1       142        60
OIR    2025130    131400  -11.1400 -137.3200      39.5         1       142        60
OIR    2025130    131400  -11.1400 -137.3300      39.6         0       142        60
OIR    2025130    131400  -11.1400 -137.3400      39.7       359       142        60
OIR    2025130    131400  -11.1400 -137.3500      39.8       358       142        60
OIR    2025130    131400  -11.1400 -137.3600      39.9       358       143        60
OIR    2025130    131400  -11.1400 -137.3700      39.9       357       143        60
OIR    2025130    131400  -11.1400 -137.3800      39.9       357       144        60
OIR    2025130    131400  -11.1400 -137.3900      39.9       357       141        60
OIR    2025130    131400  -11.1400 -137.4000      39.8       357       138        60
OIR    2025130    131400  -11.1400 -137.4100      39.8       357       136        60
OIR    2025130    131400  -11.1400 -137.4200      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.4300      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.4400      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.4500      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.4600      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.4700      39.8       356       133        60
OIR    2025130    131400  -11.1400 -137.4800      39.8       356       133        60
OIR    2025130    131400  -11.1400 -137.4900      39.8       356       133        60
OIR    2025130    131400  -11.1400 -137.5000      39.8       356       134        60
OIR    2025130    131400  -11.1400 -137.5100      39.8       356       135        60
OIR    2025130    131400  -11.1400 -137.5200      39.8       356       135        60
OIR    2025130    131400  -11.1400 -137.5300      39.8       356       135        60
OIR    2025130    131400  -11.1400 -137.5400      39.7       356       136        60
OIR    2025130    131400  -11.1400 -137.5500      39.7       356       137        60
OIR    2025130    131400  -11.1400 -137.5600      39.7       356       139        60
OIR    2025130    131400  -11.1400 -137.5700      39.7       356       140        60
OIR    2025130    131400  -11.1400 -137.5800      39.6       356       142        60
OIR    2025130    131400  -11.1400 -137.5900      39.6       356       142        60
OIR    2025130    131400  -11.1400 -137.6000      39.6       356       139        60
OIR    2025130    131400  -11.1400 -137.6100      39.5       356       142        60
OIR    2025130    131400  -11.1400 -137.6200      39.5       355       148        60
OIR    2025130    131400  -11.1400 -137.6300      39.3       355       148        60
OIR    2025130    131400  -11.1400 -137.6400      39.0       355       148        60
OIR    2025130    131400  -11.1400 -137.6500      38.3       354       148        60
OIR    2025130    131400  -11.1400 -137.6600      37.4       353       148        60
OIR    2025130    131400  -11.1400 -137.6900      32.9       350       151        60
OIR    2025130    131400  -11.1400 -137.7000      32.0       350       148        60
OIR    2025130    131400  -11.1400 -137.7100      31.7       350       143        60
OIR    2025130    131400  -11.1400 -137.7200      31.5       350       141        60
OIR    2025130    131400  -11.1400 -137.7300      31.3       350       140        60
OIR    2025130    131400  -11.1400 -137.7400      31.0       350       140        60
OIR    2025130    131400  -11.1400 -137.7500      30.6       350       139        60
OIR    2025130    131400  -11.1400 -137.7600      29.8       350       137        60
OIR    2025130    131400  -11.1400 -137.7700      28.9       350       135        60
OIR    2025130    131400  -11.1400 -137.7800      28.2       350       135        60
OIR    2025130    131400  -11.1400 -137.7900      27.9       350       135        60
OIR    2025130    131400  -11.1400 -137.8000      27.7       350       136        60
OIR    2025130    131400  -11.1400 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.1400 -137.8200      27.7       350       137        60
OIR    2025130    131400  -11.1400 -137.8300      27.7       350       137        60
OIR    2025130    131400  -11.1400 -137.8400      27.6       350       136        60
OIR    2025130    131400  -11.1400 -137.8500      27.6       350       135        60
OIR    2025130    131400  -11.1400 -137.8600      27.6       350       134        60
OIR    2025130    131400  -11.1400 -137.8700      27.6       350       134        60
OIR    2025130    131400  -11.1400 -137.8800      27.6       350       134        60
OIR    2025130    131400  -11.1400 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1400 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.1400 -137.9100      27.5       350       133        60
OIR    2025130    131400  -11.1400 -137.9200      27.5       350       133        60
OIR    2025130    131400  -11.1400 -137.9300      27.5       350       134        60
OIR    2025130    131400  -11.1400 -137.9400      27.5       350       134        60
OIR    2025130    131400  -11.1400 -137.9500      27.5       350       134        60
OIR    2025130    131400  -11.1400 -137.9600      27.4       350       134        60
OIR    2025130    131400  -11.1400 -137.9700      27.4       350       134        60
OIR    2025130    131400  -11.1400 -137.9800      27.4       350       133        60
OIR    2025130    131400  -11.1400 -137.9900      27.4       350       132        60
OIR    2025130    131400  -11.1400 -138.0000      27.4       350       133        60
OIR    2025130    131400  -11.1400 -138.0100      27.4       351       134        60
OIR    2025130    131400  -11.1400 -138.0200      27.4       351       135        60
OIR    2025130    131400  -11.1400 -138.0300      27.4       351       137        60
OIR    2025130    131400  -11.1400 -138.0400      27.4       351       139        60
OIR    2025130    131400  -11.1400 -138.0500      27.4       351       139        60
OIR    2025130    131400  -11.1400 -138.0600      27.4       351       138        60
OIR    2025130    131400  -11.1400 -138.0700      27.4       351       137        60
OIR    2025130    131400  -11.1400 -138.0800      27.4       351       136        60
OIR    2025130    131400  -11.1400 -138.0900      27.4       351       135        60
OIR    2025130    131400  -11.1400 -138.1000      27.4       351       133        60
OIR    2025130    131400  -11.1400 -138.1100      27.4       351       133        60
OIR    2025130    131400  -11.1400 -138.1200      27.4       351       133        60
OIR    2025130    131400  -11.1400 -138.1300      27.4       351       133        60
OIR    2025130    131400  -11.1400 -138.1400      27.4       351       134        60
OIR    2025130    131400  -11.1400 -138.1500      27.4       351       136        60
OIR    2025130    131400  -11.1400 -138.1600      27.4       351       135        60
OIR    2025130    131400  -11.1400 -138.1700      27.4       351       134        60
OIR    2025130    131400  -11.1400 -138.1800      27.4       351       135        60
OIR    2025130    131400  -11.1400 -138.1900      27.4       351       137        60
OIR    2025130    131400  -11.1400 -138.2000      27.3       351       137        60
OIR    2025130    131400  -11.1400 -138.2100      27.3       351       138        60
OIR    2025130    131400  -11.1400 -138.2200      27.3       351       138        60
OIR    2025130    131400  -11.1400 -138.2300      27.3       351       138        60
OIR    2025130    131400  -11.1400 -138.2400      27.2       351       139        60
OIR    2025130    131400  -11.1400 -138.2500      27.2       351       141        60
OIR    2025130    131400  -11.1400 -138.2600      27.1       352       142        60
OIR    2025130    131400  -11.1400 -138.2700      27.1       352       144        60
OIR    2025130    131400  -11.1400 -138.2800      26.9       353       144        60
OIR    2025130    131400  -11.1400 -138.2900      26.7       354       144        60
OIR    2025130    131400  -11.1400 -138.3000      26.5       355       144        60
OIR    2025130    131400  -11.1400 -138.3100      26.3       356       145        60
OIR    2025130    131400  -11.1400 -138.3200      26.1       356       146        60
OIR    2025130    131400  -11.1400 -138.3300      25.8       357       148        60
OIR    2025130    131400  -11.1400 -138.3700      25.0         0       148        60
OIR    2025130    131400  -11.1400 -138.3800      24.9         1       147        60
OIR    2025130    131400  -11.1400 -138.3900      24.9         1       148        60
OIR    2025130    131400  -11.1400 -138.4000      24.8         1       150        60
OIR    2025130    131400  -11.1500 -136.7300      39.9        18       148        60
OIR    2025130    131400  -11.1500 -136.7400      39.9        18       148        60
OIR    2025130    131400  -11.1500 -136.7500      39.9        18       150        60
OIR    2025130    131400  -11.1500 -136.8300      39.9        18       149        60
OIR    2025130    131400  -11.1500 -136.8400      39.9        18       145        60
OIR    2025130    131400  -11.1500 -136.8500      40.0        18       144        60
OIR    2025130    131400  -11.1500 -136.8600      40.0        18       146        60
OIR    2025130    131400  -11.1500 -136.8700      40.0        18       147        60
OIR    2025130    131400  -11.1500 -136.8800      40.0        18       146        60
OIR    2025130    131400  -11.1500 -136.8900      40.1        18       146        60
OIR    2025130    131400  -11.1500 -136.9000      40.2        18       144        60
OIR    2025130    131400  -11.1500 -136.9100      40.2        18       144        60
OIR    2025130    131400  -11.1500 -136.9200      40.2        18       144        60
OIR    2025130    131400  -11.1500 -136.9300      40.1        18       144        60
OIR    2025130    131400  -11.1500 -136.9400      39.9        18       145        60
OIR    2025130    131400  -11.1500 -136.9500      39.4        17       147        60
OIR    2025130    131400  -11.1500 -136.9600      38.7        16       149        60
OIR    2025130    131400  -11.1500 -136.9700      38.0        15       148        60
OIR    2025130    131400  -11.1500 -136.9800      37.5        15       146        60
OIR    2025130    131400  -11.1500 -136.9900      37.3        14       145        60
OIR    2025130    131400  -11.1500 -137.0000      37.1        14       145        60
OIR    2025130    131400  -11.1500 -137.0100      37.1        14       145        60
OIR    2025130    131400  -11.1500 -137.0200      37.0        13       145        60
OIR    2025130    131400  -11.1500 -137.0300      36.9        13       146        60
OIR    2025130    131400  -11.1500 -137.0400      36.8        12       147        60
OIR    2025130    131400  -11.1500 -137.0500      36.8        12       147        60
OIR    2025130    131400  -11.1500 -137.0600      36.8        12       147        60
OIR    2025130    131400  -11.1500 -137.0700      36.8        11       148        60
OIR    2025130    131400  -11.1500 -137.0800      36.9        11       149        60
OIR    2025130    131400  -11.1500 -137.0900      36.9        11       150        60
OIR    2025130    131400  -11.1500 -137.1000      36.9        10       149        60
OIR    2025130    131400  -11.1500 -137.1100      37.0        10       148        60
OIR    2025130    131400  -11.1500 -137.1200      37.1        10       147        60
OIR    2025130    131400  -11.1500 -137.1300      37.1        10       146        60
OIR    2025130    131400  -11.1500 -137.1400      37.2         9       145        60
OIR    2025130    131400  -11.1500 -137.1500      37.3         9       146        60
OIR    2025130    131400  -11.1500 -137.1600      37.4         9       147        60
OIR    2025130    131400  -11.1500 -137.1700      37.5         8       146        60
OIR    2025130    131400  -11.1500 -137.1800      37.5         8       146        60
OIR    2025130    131400  -11.1500 -137.1900      37.6         7       148        60
OIR    2025130    131400  -11.1500 -137.2000      37.7         7       148        60
OIR    2025130    131400  -11.1500 -137.2100      37.9         6       148        60
OIR    2025130    131400  -11.1500 -137.2200      38.0         6       147        60
OIR    2025130    131400  -11.1500 -137.2300      38.1         5       146        60
OIR    2025130    131400  -11.1500 -137.2400      38.2         5       145        60
OIR    2025130    131400  -11.1500 -137.2500      38.2         5       144        60
OIR    2025130    131400  -11.1500 -137.2600      38.3         4       145        60
OIR    2025130    131400  -11.1500 -137.2700      38.4         4       146        60
OIR    2025130    131400  -11.1500 -137.2800      38.6         3       148        60
OIR    2025130    131400  -11.1500 -137.3000      38.9         2       147        60
OIR    2025130    131400  -11.1500 -137.3100      39.1         1       144        60
OIR    2025130    131400  -11.1500 -137.3200      39.2         0       144        60
OIR    2025130    131400  -11.1500 -137.3300      39.3       360       145        60
OIR    2025130    131400  -11.1500 -137.3400      39.6       359       145        60
OIR    2025130    131400  -11.1500 -137.3500      39.8       358       145        60
OIR    2025130    131400  -11.1500 -137.3600      39.8       357       144        60
OIR    2025130    131400  -11.1500 -137.3700      39.8       357       143        60
OIR    2025130    131400  -11.1500 -137.3800      39.8       357       141        60
OIR    2025130    131400  -11.1500 -137.3900      39.8       357       140        60
OIR    2025130    131400  -11.1500 -137.4000      39.8       357       139        60
OIR    2025130    131400  -11.1500 -137.4100      39.8       356       138        60
OIR    2025130    131400  -11.1500 -137.4200      39.8       356       137        60
OIR    2025130    131400  -11.1500 -137.4300      39.8       356       137        60
OIR    2025130    131400  -11.1500 -137.4400      39.8       356       137        60
OIR    2025130    131400  -11.1500 -137.4500      39.8       356       136        60
OIR    2025130    131400  -11.1500 -137.4600      39.8       356       136        60
OIR    2025130    131400  -11.1500 -137.4700      39.8       356       136        60
OIR    2025130    131400  -11.1500 -137.4800      39.8       356       135        60
OIR    2025130    131400  -11.1500 -137.4900      39.8       356       135        60
OIR    2025130    131400  -11.1500 -137.5000      39.8       356       136        60
OIR    2025130    131400  -11.1500 -137.5100      39.8       356       137        60
OIR    2025130    131400  -11.1500 -137.5200      39.8       356       138        60
OIR    2025130    131400  -11.1500 -137.5300      39.7       356       139        60
OIR    2025130    131400  -11.1500 -137.5400      39.7       356       138        60
OIR    2025130    131400  -11.1500 -137.5500      39.7       356       138        60
OIR    2025130    131400  -11.1500 -137.5600      39.7       356       140        60
OIR    2025130    131400  -11.1500 -137.5700      39.7       356       141        60
OIR    2025130    131400  -11.1500 -137.5800      39.6       356       142        60
OIR    2025130    131400  -11.1500 -137.5900      39.6       356       142        60
OIR    2025130    131400  -11.1500 -137.6000      39.6       356       142        60
OIR    2025130    131400  -11.1500 -137.6100      39.6       356       146        60
OIR    2025130    131400  -11.1500 -137.6200      39.5       355       150        60
OIR    2025130    131400  -11.1500 -137.6600      37.6       353       149        60
OIR    2025130    131400  -11.1500 -137.6700      36.3       352       150        60
OIR    2025130    131400  -11.1500 -137.6800      34.8       351       150        60
OIR    2025130    131400  -11.1500 -137.6900      33.2       350       149        60
OIR    2025130    131400  -11.1500 -137.7000      32.0       350       147        60
OIR    2025130    131400  -11.1500 -137.7100      31.6       350       144        60
OIR    2025130    131400  -11.1500 -137.7200      31.4       350       142        60
OIR    2025130    131400  -11.1500 -137.7300      31.2       350       140        60
OIR    2025130    131400  -11.1500 -137.7400      30.9       350       139        60
OIR    2025130    131400  -11.1500 -137.7500      30.4       350       137        60
OIR    2025130    131400  -11.1500 -137.7600      29.6       350       137        60
OIR    2025130    131400  -11.1500 -137.7700      28.7       350       137        60
OIR    2025130    131400  -11.1500 -137.7800      28.1       350       136        60
OIR    2025130    131400  -11.1500 -137.7900      27.8       350       136        60
OIR    2025130    131400  -11.1500 -137.8000      27.7       350       137        60
OIR    2025130    131400  -11.1500 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.1500 -137.8200      27.7       350       137        60
OIR    2025130    131400  -11.1500 -137.8300      27.7       350       135        60
OIR    2025130    131400  -11.1500 -137.8400      27.6       350       134        60
OIR    2025130    131400  -11.1500 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.1500 -137.8600      27.6       350       134        60
OIR    2025130    131400  -11.1500 -137.8700      27.6       350       134        60
OIR    2025130    131400  -11.1500 -137.8800      27.5       350       134        60
OIR    2025130    131400  -11.1500 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1500 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.1500 -137.9100      27.5       350       135        60
OIR    2025130    131400  -11.1500 -137.9200      27.5       350       136        60
OIR    2025130    131400  -11.1500 -137.9300      27.5       350       136        60
OIR    2025130    131400  -11.1500 -137.9400      27.5       350       136        60
OIR    2025130    131400  -11.1500 -137.9500      27.5       350       135        60
OIR    2025130    131400  -11.1500 -137.9600      27.4       350       134        60
OIR    2025130    131400  -11.1500 -137.9700      27.4       350       133        60
OIR    2025130    131400  -11.1500 -137.9800      27.4       350       133        60
OIR    2025130    131400  -11.1500 -137.9900      27.4       350       133        60
OIR    2025130    131400  -11.1500 -138.0000      27.4       350       133        60
OIR    2025130    131400  -11.1500 -138.0100      27.4       350       132        60
OIR    2025130    131400  -11.1500 -138.0200      27.4       351       134        60
OIR    2025130    131400  -11.1500 -138.0300      27.4       351       135        60
OIR    2025130    131400  -11.1500 -138.0400      27.4       351       136        60
OIR    2025130    131400  -11.1500 -138.0500      27.4       351       137        60
OIR    2025130    131400  -11.1500 -138.0600      27.4       351       136        60
OIR    2025130    131400  -11.1500 -138.0700      27.4       351       136        60
OIR    2025130    131400  -11.1500 -138.0800      27.4       351       136        60
OIR    2025130    131400  -11.1500 -138.0900      27.4       351       134        60
OIR    2025130    131400  -11.1500 -138.1000      27.4       351       133        60
OIR    2025130    131400  -11.1500 -138.1100      27.4       351       132        60
OIR    2025130    131400  -11.1500 -138.1200      27.4       351       132        60
OIR    2025130    131400  -11.1500 -138.1300      27.4       351       132        60
OIR    2025130    131400  -11.1500 -138.1400      27.4       351       133        60
OIR    2025130    131400  -11.1500 -138.1500      27.4       351       135        60
OIR    2025130    131400  -11.1500 -138.1600      27.4       351       135        60
OIR    2025130    131400  -11.1500 -138.1700      27.3       351       135        60
OIR    2025130    131400  -11.1500 -138.1800      27.3       351       135        60
OIR    2025130    131400  -11.1500 -138.1900      27.3       351       137        60
OIR    2025130    131400  -11.1500 -138.2000      27.3       351       137        60
OIR    2025130    131400  -11.1500 -138.2100      27.3       351       137        60
OIR    2025130    131400  -11.1500 -138.2200      27.3       351       136        60
OIR    2025130    131400  -11.1500 -138.2300      27.2       351       136        60
OIR    2025130    131400  -11.1500 -138.2400      27.2       351       138        60
OIR    2025130    131400  -11.1500 -138.2500      27.1       351       141        60
OIR    2025130    131400  -11.1500 -138.2600      27.1       352       143        60
OIR    2025130    131400  -11.1500 -138.2700      27.0       352       144        60
OIR    2025130    131400  -11.1500 -138.2800      26.9       353       142        60
OIR    2025130    131400  -11.1500 -138.2900      26.7       354       143        60
OIR    2025130    131400  -11.1500 -138.3000      26.5       354       145        60
OIR    2025130    131400  -11.1500 -138.3100      26.2       355       145        60
OIR    2025130    131400  -11.1500 -138.3200      26.0       356       146        60
OIR    2025130    131400  -11.1500 -138.3300      25.6       357       147        60
OIR    2025130    131400  -11.1500 -138.3400      25.3       358       149        60
OIR    2025130    131400  -11.1500 -138.3500      25.2       359       148        60
OIR    2025130    131400  -11.1500 -138.3600      25.0       360       147        60
OIR    2025130    131400  -11.1500 -138.3700      24.9         0       146        60
OIR    2025130    131400  -11.1500 -138.3800      24.8         1       146        60
OIR    2025130    131400  -11.1500 -138.3900      24.8         1       149        60
OIR    2025130    131400  -11.1500 -138.4000      24.7         1       150        60
OIR    2025130    131400  -11.1500 -138.4100      24.7         2       150        60
OIR    2025130    131400  -11.1600 -136.7300      39.8        18       149        60
OIR    2025130    131400  -11.1600 -136.7400      39.8        18       148        60
OIR    2025130    131400  -11.1600 -136.7500      39.9        18       149        60
OIR    2025130    131400  -11.1600 -136.8400      39.9        18       148        60
OIR    2025130    131400  -11.1600 -136.8500      39.9        18       147        60
OIR    2025130    131400  -11.1600 -136.8600      39.9        18       148        60
OIR    2025130    131400  -11.1600 -136.8700      40.0        18       149        60
OIR    2025130    131400  -11.1600 -136.8800      40.0        18       150        60
OIR    2025130    131400  -11.1600 -136.8900      40.0        18       150        60
OIR    2025130    131400  -11.1600 -136.9000      40.0        18       148        60
OIR    2025130    131400  -11.1600 -136.9100      40.0        18       146        60
OIR    2025130    131400  -11.1600 -136.9200      40.0        18       144        60
OIR    2025130    131400  -11.1600 -136.9300      39.9        18       145        60
OIR    2025130    131400  -11.1600 -136.9400      39.5        17       145        60
OIR    2025130    131400  -11.1600 -136.9500      38.8        17       146        60
OIR    2025130    131400  -11.1600 -136.9600      38.1        16       147        60
OIR    2025130    131400  -11.1600 -136.9700      37.6        15       147        60
OIR    2025130    131400  -11.1600 -136.9800      37.3        15       147        60
OIR    2025130    131400  -11.1600 -136.9900      37.1        14       147        60
OIR    2025130    131400  -11.1600 -137.0000      36.9        14       147        60
OIR    2025130    131400  -11.1600 -137.0100      36.8        14       146        60
OIR    2025130    131400  -11.1600 -137.0200      36.7        13       146        60
OIR    2025130    131400  -11.1600 -137.0300      36.7        13       148        60
OIR    2025130    131400  -11.1600 -137.0400      36.6        12       147        60
OIR    2025130    131400  -11.1600 -137.0500      36.6        12       147        60
OIR    2025130    131400  -11.1600 -137.0600      36.6        12       148        60
OIR    2025130    131400  -11.1600 -137.0700      36.6        11       150        60
OIR    2025130    131400  -11.1600 -137.0800      36.6        11       150        60
OIR    2025130    131400  -11.1600 -137.0900      36.7        11       150        60
OIR    2025130    131400  -11.1600 -137.1000      36.7        10       149        60
OIR    2025130    131400  -11.1600 -137.1100      36.7        10       148        60
OIR    2025130    131400  -11.1600 -137.1200      36.8        10       147        60
OIR    2025130    131400  -11.1600 -137.1300      36.9         9       146        60
OIR    2025130    131400  -11.1600 -137.1400      37.0         9       145        60
OIR    2025130    131400  -11.1600 -137.1500      37.1         9       147        60
OIR    2025130    131400  -11.1600 -137.1600      37.2         8       148        60
OIR    2025130    131400  -11.1600 -137.1700      37.3         8       147        60
OIR    2025130    131400  -11.1600 -137.1800      37.4         8       146        60
OIR    2025130    131400  -11.1600 -137.1900      37.4         7       148        60
OIR    2025130    131400  -11.1600 -137.2000      37.5         7       148        60
OIR    2025130    131400  -11.1600 -137.2100      37.6         6       147        60
OIR    2025130    131400  -11.1600 -137.2200      37.7         6       146        60
OIR    2025130    131400  -11.1600 -137.2300      37.8         5       145        60
OIR    2025130    131400  -11.1600 -137.2400      37.9         5       145        60
OIR    2025130    131400  -11.1600 -137.2500      38.0         4       144        60
OIR    2025130    131400  -11.1600 -137.2600      38.0         4       145        60
OIR    2025130    131400  -11.1600 -137.2700      38.1         3       147        60
OIR    2025130    131400  -11.1600 -137.2800      38.2         3       150        60
OIR    2025130    131400  -11.1600 -137.3000      38.6         2       149        60
OIR    2025130    131400  -11.1600 -137.3100      38.9         1       146        60
OIR    2025130    131400  -11.1600 -137.3200      39.1         0       147        60
OIR    2025130    131400  -11.1600 -137.3300      39.3       360       147        60
OIR    2025130    131400  -11.1600 -137.3400      39.5       359       148        60
OIR    2025130    131400  -11.1600 -137.3500      39.7       358       147        60
OIR    2025130    131400  -11.1600 -137.3600      39.7       357       145        60
OIR    2025130    131400  -11.1600 -137.3700      39.7       357       143        60
OIR    2025130    131400  -11.1600 -137.3800      39.8       357       140        60
OIR    2025130    131400  -11.1600 -137.3900      39.7       357       140        60
OIR    2025130    131400  -11.1600 -137.4000      39.7       357       140        60
OIR    2025130    131400  -11.1600 -137.4100      39.7       356       139        60
OIR    2025130    131400  -11.1600 -137.4200      39.7       356       139        60
OIR    2025130    131400  -11.1600 -137.4300      39.8       356       139        60
OIR    2025130    131400  -11.1600 -137.4400      39.8       356       139        60
OIR    2025130    131400  -11.1600 -137.4500      39.8       356       138        60
OIR    2025130    131400  -11.1600 -137.4600      39.8       356       138        60
OIR    2025130    131400  -11.1600 -137.4700      39.7       356       137        60
OIR    2025130    131400  -11.1600 -137.4800      39.7       356       137        60
OIR    2025130    131400  -11.1600 -137.4900      39.8       356       138        60
OIR    2025130    131400  -11.1600 -137.5000      39.8       356       138        60
OIR    2025130    131400  -11.1600 -137.5100      39.7       356       139        60
OIR    2025130    131400  -11.1600 -137.5200      39.7       356       141        60
OIR    2025130    131400  -11.1600 -137.5300      39.7       356       143        60
OIR    2025130    131400  -11.1600 -137.5400      39.7       356       141        60
OIR    2025130    131400  -11.1600 -137.5500      39.7       356       140        60
OIR    2025130    131400  -11.1600 -137.5600      39.7       356       142        60
OIR    2025130    131400  -11.1600 -137.5700      39.7       356       143        60
OIR    2025130    131400  -11.1600 -137.5800      39.6       356       143        60
OIR    2025130    131400  -11.1600 -137.5900      39.6       356       144        60
OIR    2025130    131400  -11.1600 -137.6000      39.6       356       146        60
OIR    2025130    131400  -11.1600 -137.6100      39.6       356       149        60
OIR    2025130    131400  -11.1600 -137.6600      37.6       353       149        60
OIR    2025130    131400  -11.1600 -137.6700      36.5       352       149        60
OIR    2025130    131400  -11.1600 -137.6800      35.1       352       148        60
OIR    2025130    131400  -11.1600 -137.6900      33.5       351       147        60
OIR    2025130    131400  -11.1600 -137.7000      32.1       350       145        60
OIR    2025130    131400  -11.1600 -137.7100      31.6       350       144        60
OIR    2025130    131400  -11.1600 -137.7200      31.4       350       142        60
OIR    2025130    131400  -11.1600 -137.7300      31.2       350       140        60
OIR    2025130    131400  -11.1600 -137.7400      30.8       350       138        60
OIR    2025130    131400  -11.1600 -137.7500      30.2       350       137        60
OIR    2025130    131400  -11.1600 -137.7600      29.3       350       137        60
OIR    2025130    131400  -11.1600 -137.7700      28.5       350       138        60
OIR    2025130    131400  -11.1600 -137.7800      28.0       350       137        60
OIR    2025130    131400  -11.1600 -137.7900      27.8       350       137        60
OIR    2025130    131400  -11.1600 -137.8000      27.7       350       137        60
OIR    2025130    131400  -11.1600 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.1600 -137.8200      27.7       350       136        60
OIR    2025130    131400  -11.1600 -137.8300      27.6       350       135        60
OIR    2025130    131400  -11.1600 -137.8400      27.6       350       134        60
OIR    2025130    131400  -11.1600 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.1600 -137.8600      27.6       350       133        60
OIR    2025130    131400  -11.1600 -137.8700      27.6       350       134        60
OIR    2025130    131400  -11.1600 -137.8800      27.5       350       134        60
OIR    2025130    131400  -11.1600 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1600 -137.9000      27.5       350       134        60
OIR    2025130    131400  -11.1600 -137.9100      27.5       350       136        60
OIR    2025130    131400  -11.1600 -137.9200      27.5       350       137        60
OIR    2025130    131400  -11.1600 -137.9300      27.5       350       137        60
OIR    2025130    131400  -11.1600 -137.9400      27.5       350       137        60
OIR    2025130    131400  -11.1600 -137.9500      27.5       350       136        60
OIR    2025130    131400  -11.1600 -137.9600      27.4       350       135        60
OIR    2025130    131400  -11.1600 -137.9700      27.4       350       132        60
OIR    2025130    131400  -11.1600 -137.9800      27.4       350       133        60
OIR    2025130    131400  -11.1600 -137.9900      27.4       350       134        60
OIR    2025130    131400  -11.1600 -138.0000      27.4       350       133        60
OIR    2025130    131400  -11.1600 -138.0100      27.4       350       133        60
OIR    2025130    131400  -11.1600 -138.0200      27.4       350       134        60
OIR    2025130    131400  -11.1600 -138.0300      27.4       351       135        60
OIR    2025130    131400  -11.1600 -138.0400      27.4       351       136        60
OIR    2025130    131400  -11.1600 -138.0500      27.4       351       136        60
OIR    2025130    131400  -11.1600 -138.0600      27.4       351       136        60
OIR    2025130    131400  -11.1600 -138.0700      27.4       351       137        60
OIR    2025130    131400  -11.1600 -138.0800      27.4       351       137        60
OIR    2025130    131400  -11.1600 -138.0900      27.4       351       134        60
OIR    2025130    131400  -11.1600 -138.1000      27.4       351       132        60
OIR    2025130    131400  -11.1600 -138.1100      27.4       351       132        60
OIR    2025130    131400  -11.1600 -138.1200      27.4       351       132        60
OIR    2025130    131400  -11.1600 -138.1300      27.3       351       132        60
OIR    2025130    131400  -11.1600 -138.1400      27.3       351       133        60
OIR    2025130    131400  -11.1600 -138.1500      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.1600      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.1700      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.1800      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.1900      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.2000      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.2100      27.3       351       135        60
OIR    2025130    131400  -11.1600 -138.2200      27.2       351       135        60
OIR    2025130    131400  -11.1600 -138.2300      27.2       351       136        60
OIR    2025130    131400  -11.1600 -138.2400      27.1       351       138        60
OIR    2025130    131400  -11.1600 -138.2500      27.1       351       140        60
OIR    2025130    131400  -11.1600 -138.2600      27.1       351       142        60
OIR    2025130    131400  -11.1600 -138.2700      27.0       352       143        60
OIR    2025130    131400  -11.1600 -138.2800      26.8       353       141        60
OIR    2025130    131400  -11.1600 -138.2900      26.6       353       141        60
OIR    2025130    131400  -11.1600 -138.3000      26.3       354       143        60
OIR    2025130    131400  -11.1600 -138.3100      26.1       355       144        60
OIR    2025130    131400  -11.1600 -138.3200      25.8       356       145        60
OIR    2025130    131400  -11.1600 -138.3300      25.5       357       146        60
OIR    2025130    131400  -11.1600 -138.3400      25.2       358       147        60
OIR    2025130    131400  -11.1600 -138.3500      25.1       359       146        60
OIR    2025130    131400  -11.1600 -138.3600      24.9       360       145        60
OIR    2025130    131400  -11.1600 -138.3700      24.8         0       145        60
OIR    2025130    131400  -11.1600 -138.3800      24.8         1       146        60
OIR    2025130    131400  -11.1600 -138.3900      24.7         1       149        60
OIR    2025130    131400  -11.1600 -138.4000      24.7         1       150        60
OIR    2025130    131400  -11.1600 -138.4100      24.7         1       149        60
OIR    2025130    131400  -11.1700 -136.7200      39.8        18       151        60
OIR    2025130    131400  -11.1700 -136.7300      39.8        18       148        60
OIR    2025130    131400  -11.1700 -136.7400      39.8        18       149        60
OIR    2025130    131400  -11.1700 -136.8400      39.9        18       151        60
OIR    2025130    131400  -11.1700 -136.8500      39.9        18       150        60
OIR    2025130    131400  -11.1700 -136.8600      39.9        18       149        60
OIR    2025130    131400  -11.1700 -136.8700      39.9        18       149        60
OIR    2025130    131400  -11.1700 -136.8800      39.9        18       151        60
OIR    2025130    131400  -11.1700 -136.8900      39.8        18       151        60
OIR    2025130    131400  -11.1700 -136.9000      39.8        18       150        60
OIR    2025130    131400  -11.1700 -136.9100      39.7        18       148        60
OIR    2025130    131400  -11.1700 -136.9200      39.6        18       146        60
OIR    2025130    131400  -11.1700 -136.9300      39.3        17       146        60
OIR    2025130    131400  -11.1700 -136.9400      38.8        17       146        60
OIR    2025130    131400  -11.1700 -136.9500      38.1        16       146        60
OIR    2025130    131400  -11.1700 -136.9600      37.5        15       146        60
OIR    2025130    131400  -11.1700 -136.9700      37.2        15       147        60
OIR    2025130    131400  -11.1700 -136.9800      37.0        14       149        60
OIR    2025130    131400  -11.1700 -137.0100      36.6        13       150        60
OIR    2025130    131400  -11.1700 -137.0200      36.5        13       150        60
OIR    2025130    131400  -11.1700 -137.0300      36.4        13       149        60
OIR    2025130    131400  -11.1700 -137.0400      36.3        12       148        60
OIR    2025130    131400  -11.1700 -137.0500      36.3        12       147        60
OIR    2025130    131400  -11.1700 -137.0600      36.3        11       149        60
OIR    2025130    131400  -11.1700 -137.0700      36.3        11       150        60
OIR    2025130    131400  -11.1700 -137.0800      36.3        11       149        60
OIR    2025130    131400  -11.1700 -137.0900      36.3        10       148        60
OIR    2025130    131400  -11.1700 -137.1000      36.4        10       147        60
OIR    2025130    131400  -11.1700 -137.1100      36.4        10       147        60
OIR    2025130    131400  -11.1700 -137.1200      36.5        10       146        60
OIR    2025130    131400  -11.1700 -137.1300      36.5         9       146        60
OIR    2025130    131400  -11.1700 -137.1400      36.6         9       146        60
OIR    2025130    131400  -11.1700 -137.1500      36.8         8       146        60
OIR    2025130    131400  -11.1700 -137.1600      36.9         8       147        60
OIR    2025130    131400  -11.1700 -137.1700      37.0         8       146        60
OIR    2025130    131400  -11.1700 -137.1800      37.1         7       145        60
OIR    2025130    131400  -11.1700 -137.1900      37.2         7       146        60
OIR    2025130    131400  -11.1700 -137.2000      37.3         6       146        60
OIR    2025130    131400  -11.1700 -137.2100      37.4         6       146        60
OIR    2025130    131400  -11.1700 -137.2200      37.5         5       145        60
OIR    2025130    131400  -11.1700 -137.2300      37.6         5       145        60
OIR    2025130    131400  -11.1700 -137.2400      37.6         5       145        60
OIR    2025130    131400  -11.1700 -137.2500      37.7         4       146        60
OIR    2025130    131400  -11.1700 -137.2600      37.7         4       147        60
OIR    2025130    131400  -11.1700 -137.2700      37.8         3       147        60
OIR    2025130    131400  -11.1700 -137.2800      37.9         3       149        60
OIR    2025130    131400  -11.1700 -137.3000      38.3         2       148        60
OIR    2025130    131400  -11.1700 -137.3100      38.5         1       147        60
OIR    2025130    131400  -11.1700 -137.3200      38.8         0       149        60
OIR    2025130    131400  -11.1700 -137.3300      39.0       359       149        60
OIR    2025130    131400  -11.1700 -137.3400      39.3       358       148        60
OIR    2025130    131400  -11.1700 -137.3500      39.5       358       146        60
OIR    2025130    131400  -11.1700 -137.3600      39.6       357       144        60
OIR    2025130    131400  -11.1700 -137.3700      39.7       357       142        60
OIR    2025130    131400  -11.1700 -137.3800      39.7       357       141        60
OIR    2025130    131400  -11.1700 -137.3900      39.7       357       140        60
OIR    2025130    131400  -11.1700 -137.4000      39.7       356       141        60
OIR    2025130    131400  -11.1700 -137.4100      39.7       356       141        60
OIR    2025130    131400  -11.1700 -137.4200      39.7       356       141        60
OIR    2025130    131400  -11.1700 -137.4300      39.7       356       140        60
OIR    2025130    131400  -11.1700 -137.4400      39.7       356       140        60
OIR    2025130    131400  -11.1700 -137.4500      39.7       356       139        60
OIR    2025130    131400  -11.1700 -137.4600      39.7       356       138        60
OIR    2025130    131400  -11.1700 -137.4700      39.7       356       137        60
OIR    2025130    131400  -11.1700 -137.4800      39.7       356       138        60
OIR    2025130    131400  -11.1700 -137.4900      39.7       356       140        60
OIR    2025130    131400  -11.1700 -137.5000      39.7       356       140        60
OIR    2025130    131400  -11.1700 -137.5100      39.7       356       139        60
OIR    2025130    131400  -11.1700 -137.5200      39.7       356       143        60
OIR    2025130    131400  -11.1700 -137.5300      39.7       356       145        60
OIR    2025130    131400  -11.1700 -137.5400      39.7       356       144        60
OIR    2025130    131400  -11.1700 -137.5500      39.7       356       143        60
OIR    2025130    131400  -11.1700 -137.5600      39.7       356       143        60
OIR    2025130    131400  -11.1700 -137.5700      39.7       356       146        60
OIR    2025130    131400  -11.1700 -137.5800      39.6       356       149        60
OIR    2025130    131400  -11.1700 -137.6500      38.5       354       150        60
OIR    2025130    131400  -11.1700 -137.6600      37.7       353       148        60
OIR    2025130    131400  -11.1700 -137.6700      36.7       353       148        60
OIR    2025130    131400  -11.1700 -137.6800      35.3       352       147        60
OIR    2025130    131400  -11.1700 -137.6900      33.8       351       146        60
OIR    2025130    131400  -11.1700 -137.7000      32.4       350       144        60
OIR    2025130    131400  -11.1700 -137.7100      31.6       350       142        60
OIR    2025130    131400  -11.1700 -137.7200      31.4       350       140        60
OIR    2025130    131400  -11.1700 -137.7300      31.1       350       138        60
OIR    2025130    131400  -11.1700 -137.7400      30.6       350       138        60
OIR    2025130    131400  -11.1700 -137.7500      29.8       350       138        60
OIR    2025130    131400  -11.1700 -137.7600      29.0       350       138        60
OIR    2025130    131400  -11.1700 -137.7700      28.3       350       138        60
OIR    2025130    131400  -11.1700 -137.7800      27.9       350       138        60
OIR    2025130    131400  -11.1700 -137.7900      27.8       350       137        60
OIR    2025130    131400  -11.1700 -137.8000      27.7       350       137        60
OIR    2025130    131400  -11.1700 -137.8100      27.7       350       136        60
OIR    2025130    131400  -11.1700 -137.8200      27.7       350       136        60
OIR    2025130    131400  -11.1700 -137.8300      27.6       350       135        60
OIR    2025130    131400  -11.1700 -137.8400      27.6       350       134        60
OIR    2025130    131400  -11.1700 -137.8500      27.6       350       133        60
OIR    2025130    131400  -11.1700 -137.8600      27.6       350       133        60
OIR    2025130    131400  -11.1700 -137.8700      27.6       350       133        60
OIR    2025130    131400  -11.1700 -137.8800      27.5       350       134        60
OIR    2025130    131400  -11.1700 -137.8900      27.5       350       134        60
OIR    2025130    131400  -11.1700 -137.9000      27.5       350       135        60
OIR    2025130    131400  -11.1700 -137.9100      27.5       350       136        60
OIR    2025130    131400  -11.1700 -137.9200      27.5       350       137        60
OIR    2025130    131400  -11.1700 -137.9300      27.5       350       137        60
OIR    2025130    131400  -11.1700 -137.9400      27.5       350       137        60
OIR    2025130    131400  -11.1700 -137.9500      27.4       350       137        60
OIR    2025130    131400  -11.1700 -137.9600      27.4       350       135        60
OIR    2025130    131400  -11.1700 -137.9700      27.4       350       132        60
OIR    2025130    131400  -11.1700 -137.9800      27.4       350       132        60
OIR    2025130    131400  -11.1700 -137.9900      27.4       350       133        60
OIR    2025130    131400  -11.1700 -138.0000      27.4       350       133        60
OIR    2025130    131400  -11.1700 -138.0100      27.4       350       134        60
OIR    2025130    131400  -11.1700 -138.0200      27.4       350       135        60
OIR    2025130    131400  -11.1700 -138.0300      27.4       350       136        60
OIR    2025130    131400  -11.1700 -138.0400      27.4       350       137        60
OIR    2025130    131400  -11.1700 -138.0500      27.4       351       137        60
OIR    2025130    131400  -11.1700 -138.0600      27.4       351       138        60
OIR    2025130    131400  -11.1700 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1700 -138.0800      27.4       351       138        60
OIR    2025130    131400  -11.1700 -138.0900      27.4       351       135        60
OIR    2025130    131400  -11.1700 -138.1000      27.3       351       133        60
OIR    2025130    131400  -11.1700 -138.1100      27.3       351       132        60
OIR    2025130    131400  -11.1700 -138.1200      27.3       351       132        60
OIR    2025130    131400  -11.1700 -138.1300      27.3       351       133        60
OIR    2025130    131400  -11.1700 -138.1400      27.3       351       134        60
OIR    2025130    131400  -11.1700 -138.1500      27.3       351       136        60
OIR    2025130    131400  -11.1700 -138.1600      27.3       351       135        60
OIR    2025130    131400  -11.1700 -138.1700      27.3       351       134        60
OIR    2025130    131400  -11.1700 -138.1800      27.3       351       133        60
OIR    2025130    131400  -11.1700 -138.1900      27.3       351       134        60
OIR    2025130    131400  -11.1700 -138.2000      27.3       351       133        60
OIR    2025130    131400  -11.1700 -138.2100      27.3       351       133        60
OIR    2025130    131400  -11.1700 -138.2200      27.2       351       135        60
OIR    2025130    131400  -11.1700 -138.2300      27.2       351       136        60
OIR    2025130    131400  -11.1700 -138.2400      27.1       351       138        60
OIR    2025130    131400  -11.1700 -138.2500      27.0       351       139        60
OIR    2025130    131400  -11.1700 -138.2600      27.0       351       141        60
OIR    2025130    131400  -11.1700 -138.2700      26.9       352       142        60
OIR    2025130    131400  -11.1700 -138.2800      26.6       352       139        60
OIR    2025130    131400  -11.1700 -138.2900      26.5       353       139        60
OIR    2025130    131400  -11.1700 -138.3000      26.2       354       141        60
OIR    2025130    131400  -11.1700 -138.3100      25.8       355       142        60
OIR    2025130    131400  -11.1700 -138.3200      25.5       356       143        60
OIR    2025130    131400  -11.1700 -138.3300      25.3       357       145        60
OIR    2025130    131400  -11.1700 -138.3400      25.1       358       146        60
OIR    2025130    131400  -11.1700 -138.3500      25.0       359       144        60
OIR    2025130    131400  -11.1700 -138.3600      24.8       360       144        60
OIR    2025130    131400  -11.1700 -138.3700      24.7         0       144        60
OIR    2025130    131400  -11.1700 -138.3800      24.7         1       145        60
OIR    2025130    131400  -11.1700 -138.3900      24.6         1       148        60
OIR    2025130    131400  -11.1700 -138.4000      24.6         1       149        60
OIR    2025130    131400  -11.1700 -138.4100      24.6         1       148        60
OIR    2025130    131400  -11.1800 -135.3700      16.8        16       131        60
OIR    2025130    131400  -11.1800 -136.7100      39.7        18       151        60
OIR    2025130    131400  -11.1800 -136.7200      39.7        18       150        60
OIR    2025130    131400  -11.1800 -136.7300      39.8        18       148        60
OIR    2025130    131400  -11.1800 -136.7400      39.8        18       149        60
OIR    2025130    131400  -11.1800 -136.8600      39.8        18       151        60
OIR    2025130    131400  -11.1800 -136.8700      39.7        18       151        60
OIR    2025130    131400  -11.1800 -136.9100      39.1        17       150        60
OIR    2025130    131400  -11.1800 -136.9200      38.8        17       149        60
OIR    2025130    131400  -11.1800 -136.9300      38.4        17       149        60
OIR    2025130    131400  -11.1800 -136.9400      38.0        16       148        60
OIR    2025130    131400  -11.1800 -136.9500      37.4        16       146        60
OIR    2025130    131400  -11.1800 -136.9600      37.0        15       146        60
OIR    2025130    131400  -11.1800 -136.9700      36.8        15       147        60
OIR    2025130    131400  -11.1800 -136.9800      36.7        14       149        60
OIR    2025130    131400  -11.1800 -137.0300      36.1        13       151        60
OIR    2025130    131400  -11.1800 -137.0400      36.0        12       149        60
OIR    2025130    131400  -11.1800 -137.0500      35.9        12       148        60
OIR    2025130    131400  -11.1800 -137.0600      35.9        11       149        60
OIR    2025130    131400  -11.1800 -137.0700      35.9        11       150        60
OIR    2025130    131400  -11.1800 -137.0800      36.0        11       149        60
OIR    2025130    131400  -11.1800 -137.0900      36.0        10       148        60
OIR    2025130    131400  -11.1800 -137.1000      36.0        10       146        60
OIR    2025130    131400  -11.1800 -137.1100      36.0        10       146        60
OIR    2025130    131400  -11.1800 -137.1200      36.1         9       146        60
OIR    2025130    131400  -11.1800 -137.1300      36.2         9       146        60
OIR    2025130    131400  -11.1800 -137.1400      36.3         9       146        60
OIR    2025130    131400  -11.1800 -137.1500      36.4         8       146        60
OIR    2025130    131400  -11.1800 -137.1600      36.5         8       146        60
OIR    2025130    131400  -11.1800 -137.1700      36.6         8       145        60
OIR    2025130    131400  -11.1800 -137.1800      36.7         7       145        60
OIR    2025130    131400  -11.1800 -137.1900      36.9         7       145        60
OIR    2025130    131400  -11.1800 -137.2000      37.0         6       145        60
OIR    2025130    131400  -11.1800 -137.2100      37.1         6       146        60
OIR    2025130    131400  -11.1800 -137.2200      37.2         5       146        60
OIR    2025130    131400  -11.1800 -137.2300      37.2         5       146        60
OIR    2025130    131400  -11.1800 -137.2400      37.3         4       146        60
OIR    2025130    131400  -11.1800 -137.2500      37.4         4       147        60
OIR    2025130    131400  -11.1800 -137.2600      37.5         4       148        60
OIR    2025130    131400  -11.1800 -137.2700      37.6         3       148        60
OIR    2025130    131400  -11.1800 -137.2800      37.7         3       150        60
OIR    2025130    131400  -11.1800 -137.3000      38.0         2       150        60
OIR    2025130    131400  -11.1800 -137.3100      38.2         1       149        60
OIR    2025130    131400  -11.1800 -137.3200      38.5         0       150        60
OIR    2025130    131400  -11.1800 -137.3300      38.8       359       151        60
OIR    2025130    131400  -11.1800 -137.3400      39.1       358       148        60
OIR    2025130    131400  -11.1800 -137.3500      39.4       358       146        60
OIR    2025130    131400  -11.1800 -137.3600      39.6       357       144        60
OIR    2025130    131400  -11.1800 -137.3700      39.6       357       143        60
OIR    2025130    131400  -11.1800 -137.3800      39.7       357       142        60
OIR    2025130    131400  -11.1800 -137.3900      39.7       357       142        60
OIR    2025130    131400  -11.1800 -137.4000      39.7       356       143        60
OIR    2025130    131400  -11.1800 -137.4100      39.7       356       143        60
OIR    2025130    131400  -11.1800 -137.4200      39.7       356       143        60
OIR    2025130    131400  -11.1800 -137.4300      39.7       356       142        60
OIR    2025130    131400  -11.1800 -137.4400      39.7       356       141        60
OIR    2025130    131400  -11.1800 -137.4500      39.7       356       140        60
OIR    2025130    131400  -11.1800 -137.4600      39.7       356       139        60
OIR    2025130    131400  -11.1800 -137.4700      39.7       356       138        60
OIR    2025130    131400  -11.1800 -137.4800      39.7       356       139        60
OIR    2025130    131400  -11.1800 -137.4900      39.7       356       141        60
OIR    2025130    131400  -11.1800 -137.5000      39.7       356       141        60
OIR    2025130    131400  -11.1800 -137.5100      39.7       356       141        60
OIR    2025130    131400  -11.1800 -137.5200      39.7       356       144        60
OIR    2025130    131400  -11.1800 -137.5300      39.7       356       146        60
OIR    2025130    131400  -11.1800 -137.5400      39.7       356       145        60
OIR    2025130    131400  -11.1800 -137.5500      39.7       356       145        60
OIR    2025130    131400  -11.1800 -137.5600      39.7       356       145        60
OIR    2025130    131400  -11.1800 -137.5700      39.7       356       147        60
OIR    2025130    131400  -11.1800 -137.6500      38.5       354       149        60
OIR    2025130    131400  -11.1800 -137.6600      37.8       354       147        60
OIR    2025130    131400  -11.1800 -137.6700      36.9       353       148        60
OIR    2025130    131400  -11.1800 -137.6800      35.7       352       147        60
OIR    2025130    131400  -11.1800 -137.6900      34.2       351       145        60
OIR    2025130    131400  -11.1800 -137.7000      32.7       350       144        60
OIR    2025130    131400  -11.1800 -137.7100      31.7       350       142        60
OIR    2025130    131400  -11.1800 -137.7200      31.3       350       140        60
OIR    2025130    131400  -11.1800 -137.7300      30.9       350       139        60
OIR    2025130    131400  -11.1800 -137.7400      30.2       350       138        60
OIR    2025130    131400  -11.1800 -137.7500      29.4       350       138        60
OIR    2025130    131400  -11.1800 -137.7600      28.6       350       138        60
OIR    2025130    131400  -11.1800 -137.7700      28.1       350       138        60
OIR    2025130    131400  -11.1800 -137.7800      27.9       350       137        60
OIR    2025130    131400  -11.1800 -137.7900      27.8       350       137        60
OIR    2025130    131400  -11.1800 -137.8000      27.7       350       137        60
OIR    2025130    131400  -11.1800 -137.8100      27.7       350       136        60
OIR    2025130    131400  -11.1800 -137.8200      27.7       350       136        60
OIR    2025130    131400  -11.1800 -137.8300      27.6       350       136        60
OIR    2025130    131400  -11.1800 -137.8400      27.6       350       134        60
OIR    2025130    131400  -11.1800 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.1800 -137.8600      27.6       350       133        60
OIR    2025130    131400  -11.1800 -137.8700      27.5       350       134        60
OIR    2025130    131400  -11.1800 -137.8800      27.5       350       135        60
OIR    2025130    131400  -11.1800 -137.8900      27.5       350       135        60
OIR    2025130    131400  -11.1800 -137.9000      27.5       350       135        60
OIR    2025130    131400  -11.1800 -137.9100      27.5       350       137        60
OIR    2025130    131400  -11.1800 -137.9200      27.5       350       137        60
OIR    2025130    131400  -11.1800 -137.9300      27.5       350       137        60
OIR    2025130    131400  -11.1800 -137.9400      27.5       350       137        60
OIR    2025130    131400  -11.1800 -137.9500      27.4       350       138        60
OIR    2025130    131400  -11.1800 -137.9600      27.4       350       136        60
OIR    2025130    131400  -11.1800 -137.9700      27.4       350       133        60
OIR    2025130    131400  -11.1800 -137.9800      27.4       350       133        60
OIR    2025130    131400  -11.1800 -137.9900      27.4       350       133        60
OIR    2025130    131400  -11.1800 -138.0000      27.4       350       134        60
OIR    2025130    131400  -11.1800 -138.0100      27.4       350       134        60
OIR    2025130    131400  -11.1800 -138.0200      27.4       350       136        60
OIR    2025130    131400  -11.1800 -138.0300      27.4       350       136        60
OIR    2025130    131400  -11.1800 -138.0400      27.4       350       137        60
OIR    2025130    131400  -11.1800 -138.0500      27.4       350       137        60
OIR    2025130    131400  -11.1800 -138.0600      27.4       350       138        60
OIR    2025130    131400  -11.1800 -138.0700      27.4       351       138        60
OIR    2025130    131400  -11.1800 -138.0800      27.3       351       138        60
OIR    2025130    131400  -11.1800 -138.0900      27.3       351       136        60
OIR    2025130    131400  -11.1800 -138.1000      27.3       351       135        60
OIR    2025130    131400  -11.1800 -138.1100      27.3       351       134        60
OIR    2025130    131400  -11.1800 -138.1200      27.3       351       134        60
OIR    2025130    131400  -11.1800 -138.1300      27.3       351       135        60
OIR    2025130    131400  -11.1800 -138.1400      27.3       351       135        60
OIR    2025130    131400  -11.1800 -138.1500      27.3       351       136        60
OIR    2025130    131400  -11.1800 -138.1600      27.3       351       135        60
OIR    2025130    131400  -11.1800 -138.1700      27.3       351       133        60
OIR    2025130    131400  -11.1800 -138.1800      27.3       351       133        60
OIR    2025130    131400  -11.1800 -138.1900      27.3       351       133        60
OIR    2025130    131400  -11.1800 -138.2000      27.2       351       132        60
OIR    2025130    131400  -11.1800 -138.2100      27.2       351       132        60
OIR    2025130    131400  -11.1800 -138.2200      27.2       351       135        60
OIR    2025130    131400  -11.1800 -138.2300      27.1       351       137        60
OIR    2025130    131400  -11.1800 -138.2400      27.1       351       138        60
OIR    2025130    131400  -11.1800 -138.2500      27.0       351       139        60
OIR    2025130    131400  -11.1800 -138.2600      26.9       351       140        60
OIR    2025130    131400  -11.1800 -138.2700      26.7       352       140        60
OIR    2025130    131400  -11.1800 -138.2800      26.5       352       138        60
OIR    2025130    131400  -11.1800 -138.2900      26.2       353       138        60
OIR    2025130    131400  -11.1800 -138.3000      25.9       354       138        60
OIR    2025130    131400  -11.1800 -138.3100      25.6       355       140        60
OIR    2025130    131400  -11.1800 -138.3200      25.4       356       141        60
OIR    2025130    131400  -11.1800 -138.3300      25.1       357       143        60
OIR    2025130    131400  -11.1800 -138.3400      24.9       358       144        60
OIR    2025130    131400  -11.1800 -138.3500      24.8       359       143        60
OIR    2025130    131400  -11.1800 -138.3600      24.7       360       143        60
OIR    2025130    131400  -11.1800 -138.3700      24.6         0       143        60
OIR    2025130    131400  -11.1800 -138.3800      24.5         1       144        60
OIR    2025130    131400  -11.1800 -138.3900      24.5         1       147        60
OIR    2025130    131400  -11.1800 -138.4000      24.5         1       149        60
OIR    2025130    131400  -11.1800 -138.4100      24.5         1       149        60
OIR    2025130    131400  -11.1800 -138.4200      24.5         2       150        60
OIR    2025130    131400  -11.1900 -136.7100      39.7        18       151        60
OIR    2025130    131400  -11.1900 -136.7200      39.7        18       149        60
OIR    2025130    131400  -11.1900 -136.7300      39.7        18       147        60
OIR    2025130    131400  -11.1900 -136.7400      39.8        18       148        60
OIR    2025130    131400  -11.1900 -136.9500      36.9        15       149        60
OIR    2025130    131400  -11.1900 -136.9600      36.6        15       147        60
OIR    2025130    131400  -11.1900 -136.9700      36.4        15       146        60
OIR    2025130    131400  -11.1900 -136.9800      36.3        14       146        60
OIR    2025130    131400  -11.1900 -136.9900      36.1        14       149        60
OIR    2025130    131400  -11.1900 -137.0000      36.0        14       150        60
OIR    2025130    131400  -11.1900 -137.0500      35.6        11       150        60
OIR    2025130    131400  -11.1900 -137.0600      35.5        11       150        60
OIR    2025130    131400  -11.1900 -137.0700      35.5        11       149        60
OIR    2025130    131400  -11.1900 -137.0800      35.5        10       150        60
OIR    2025130    131400  -11.1900 -137.0900      35.6        10       149        60
OIR    2025130    131400  -11.1900 -137.1000      35.6        10       147        60
OIR    2025130    131400  -11.1900 -137.1100      35.7        10       147        60
OIR    2025130    131400  -11.1900 -137.1200      35.7         9       147        60
OIR    2025130    131400  -11.1900 -137.1300      35.8         9       146        60
OIR    2025130    131400  -11.1900 -137.1400      35.9         9       145        60
OIR    2025130    131400  -11.1900 -137.1500      36.1         8       145        60
OIR    2025130    131400  -11.1900 -137.1600      36.2         8       145        60
OIR    2025130    131400  -11.1900 -137.1700      36.2         7       145        60
OIR    2025130    131400  -11.1900 -137.1800      36.4         7       145        60
OIR    2025130    131400  -11.1900 -137.1900      36.5         7       144        60
OIR    2025130    131400  -11.1900 -137.2000      36.6         6       145        60
OIR    2025130    131400  -11.1900 -137.2100      36.7         6       148        60
OIR    2025130    131400  -11.1900 -137.2200      36.8         5       148        60
OIR    2025130    131400  -11.1900 -137.2300      36.9         5       147        60
OIR    2025130    131400  -11.1900 -137.2400      37.0         4       146        60
OIR    2025130    131400  -11.1900 -137.2500      37.2         4       146        60
OIR    2025130    131400  -11.1900 -137.2600      37.3         3       149        60
OIR    2025130    131400  -11.1900 -137.3400      38.9       358       148        60
OIR    2025130    131400  -11.1900 -137.3500      39.3       358       146        60
OIR    2025130    131400  -11.1900 -137.3600      39.5       357       146        60
OIR    2025130    131400  -11.1900 -137.3700      39.6       357       144        60
OIR    2025130    131400  -11.1900 -137.3800      39.6       357       143        60
OIR    2025130    131400  -11.1900 -137.3900      39.6       357       146        60
OIR    2025130    131400  -11.1900 -137.4000      39.6       356       149        60
OIR    2025130    131400  -11.1900 -137.4100      39.7       356       149        60
OIR    2025130    131400  -11.1900 -137.4200      39.7       356       148        60
OIR    2025130    131400  -11.1900 -137.4300      39.7       356       144        60
OIR    2025130    131400  -11.1900 -137.4400      39.7       356       142        60
OIR    2025130    131400  -11.1900 -137.4500      39.7       356       142        60
OIR    2025130    131400  -11.1900 -137.4600      39.7       356       141        60
OIR    2025130    131400  -11.1900 -137.4700      39.7       356       140        60
OIR    2025130    131400  -11.1900 -137.4800      39.7       356       141        60
OIR    2025130    131400  -11.1900 -137.4900      39.7       356       142        60
OIR    2025130    131400  -11.1900 -137.5000      39.7       356       142        60
OIR    2025130    131400  -11.1900 -137.5100      39.7       356       143        60
OIR    2025130    131400  -11.1900 -137.5200      39.7       356       145        60
OIR    2025130    131400  -11.1900 -137.5300      39.7       356       146        60
OIR    2025130    131400  -11.1900 -137.5400      39.7       356       146        60
OIR    2025130    131400  -11.1900 -137.5500      39.7       356       146        60
OIR    2025130    131400  -11.1900 -137.5600      39.7       356       146        60
OIR    2025130    131400  -11.1900 -137.5700      39.7       356       148        60
OIR    2025130    131400  -11.1900 -137.6500      38.5       354       148        60
OIR    2025130    131400  -11.1900 -137.6600      37.8       354       146        60
OIR    2025130    131400  -11.1900 -137.6700      37.1       353       148        60
OIR    2025130    131400  -11.1900 -137.6800      36.1       352       147        60
OIR    2025130    131400  -11.1900 -137.6900      34.7       351       145        60
OIR    2025130    131400  -11.1900 -137.7000      32.9       350       143        60
OIR    2025130    131400  -11.1900 -137.7100      31.8       350       143        60
OIR    2025130    131400  -11.1900 -137.7200      31.1       350       141        60
OIR    2025130    131400  -11.1900 -137.7300      30.4       350       140        60
OIR    2025130    131400  -11.1900 -137.7400      29.6       350       139        60
OIR    2025130    131400  -11.1900 -137.7500      28.9       350       138        60
OIR    2025130    131400  -11.1900 -137.7600      28.3       350       138        60
OIR    2025130    131400  -11.1900 -137.7700      28.0       350       138        60
OIR    2025130    131400  -11.1900 -137.7800      27.8       350       137        60
OIR    2025130    131400  -11.1900 -137.7900      27.8       350       137        60
OIR    2025130    131400  -11.1900 -137.8000      27.7       350       136        60
OIR    2025130    131400  -11.1900 -137.8100      27.7       350       136        60
OIR    2025130    131400  -11.1900 -137.8200      27.7       350       137        60
OIR    2025130    131400  -11.1900 -137.8300      27.6       350       136        60
OIR    2025130    131400  -11.1900 -137.8400      27.6       350       135        60
OIR    2025130    131400  -11.1900 -137.8500      27.6       350       134        60
OIR    2025130    131400  -11.1900 -137.8600      27.6       350       134        60
OIR    2025130    131400  -11.1900 -137.8700      27.5       350       135        60
OIR    2025130    131400  -11.1900 -137.8800      27.5       350       136        60
OIR    2025130    131400  -11.1900 -137.8900      27.5       350       135        60
OIR    2025130    131400  -11.1900 -137.9000      27.5       350       136        60
OIR    2025130    131400  -11.1900 -137.9100      27.5       350       137        60
OIR    2025130    131400  -11.1900 -137.9200      27.5       350       137        60
OIR    2025130    131400  -11.1900 -137.9300      27.5       350       137        60
OIR    2025130    131400  -11.1900 -137.9400      27.4       350       137        60
OIR    2025130    131400  -11.1900 -137.9500      27.4       350       138        60
OIR    2025130    131400  -11.1900 -137.9600      27.4       350       136        60
OIR    2025130    131400  -11.1900 -137.9700      27.4       350       133        60
OIR    2025130    131400  -11.1900 -137.9800      27.4       350       133        60
OIR    2025130    131400  -11.1900 -137.9900      27.4       350       133        60
OIR    2025130    131400  -11.1900 -138.0000      27.4       350       134        60
OIR    2025130    131400  -11.1900 -138.0100      27.4       350       134        60
OIR    2025130    131400  -11.1900 -138.0200      27.4       350       136        60
OIR    2025130    131400  -11.1900 -138.0300      27.4       350       137        60
OIR    2025130    131400  -11.1900 -138.0400      27.4       350       137        60
OIR    2025130    131400  -11.1900 -138.0500      27.4       350       137        60
OIR    2025130    131400  -11.1900 -138.0600      27.3       350       137        60
OIR    2025130    131400  -11.1900 -138.0700      27.3       350       138        60
OIR    2025130    131400  -11.1900 -138.0800      27.3       350       139        60
OIR    2025130    131400  -11.1900 -138.0900      27.3       351       138        60
OIR    2025130    131400  -11.1900 -138.1000      27.3       351       137        60
OIR    2025130    131400  -11.1900 -138.1100      27.3       351       136        60
OIR    2025130    131400  -11.1900 -138.1200      27.3       351       136        60
OIR    2025130    131400  -11.1900 -138.1300      27.3       351       137        60
OIR    2025130    131400  -11.1900 -138.1400      27.3       351       137        60
OIR    2025130    131400  -11.1900 -138.1500      27.3       351       136        60
OIR    2025130    131400  -11.1900 -138.1600      27.3       351       134        60
OIR    2025130    131400  -11.1900 -138.1700      27.3       351       133        60
OIR    2025130    131400  -11.1900 -138.1800      27.2       351       132        60
OIR    2025130    131400  -11.1900 -138.1900      27.2       351       132        60
OIR    2025130    131400  -11.1900 -138.2000      27.2       351       131        60
OIR    2025130    131400  -11.1900 -138.2100      27.2       351       132        60
OIR    2025130    131400  -11.1900 -138.2200      27.1       351       135        60
OIR    2025130    131400  -11.1900 -138.2300      27.1       351       137        60
OIR    2025130    131400  -11.1900 -138.2400      27.0       351       137        60
OIR    2025130    131400  -11.1900 -138.2500      26.9       351       138        60
OIR    2025130    131400  -11.1900 -138.2600      26.8       351       138        60
OIR    2025130    131400  -11.1900 -138.2700      26.5       352       137        60
OIR    2025130    131400  -11.1900 -138.2800      26.2       352       136        60
OIR    2025130    131400  -11.1900 -138.2900      26.0       353       136        60
OIR    2025130    131400  -11.1900 -138.3000      25.6       354       137        60
OIR    2025130    131400  -11.1900 -138.3100      25.3       355       137        60
OIR    2025130    131400  -11.1900 -138.3200      25.1       356       138        60
OIR    2025130    131400  -11.1900 -138.3300      24.9       357       140        60
OIR    2025130    131400  -11.1900 -138.3400      24.7       358       142        60
OIR    2025130    131400  -11.1900 -138.3500      24.7       359       142        60
OIR    2025130    131400  -11.1900 -138.3600      24.5       360       142        60
OIR    2025130    131400  -11.1900 -138.3700      24.4         0       142        60
OIR    2025130    131400  -11.1900 -138.3800      24.4         0       143        60
OIR    2025130    131400  -11.1900 -138.3900      24.4         1       146        60
OIR    2025130    131400  -11.1900 -138.4000      24.4         1       148        60
OIR    2025130    131400  -11.1900 -138.4100      24.4         1       149        60
OIR    2025130    131400  -11.1900 -138.4200      24.4         2       149        60
OIR    2025130    131400  -11.1900 -138.4300      24.4         2       149        60
OIR    2025130    131400  -11.1900 -138.4400      24.4         2       150        60
OIR    2025130    131400  -11.2000 -136.7200      39.7        18       150        60
OIR    2025130    131400  -11.2000 -136.7300      39.7        18       149        60
OIR    2025130    131400  -11.2000 -136.7400      39.7        18       150        60
OIR    2025130    131400  -11.2000 -136.9500      36.3        15       150        60
OIR    2025130    131400  -11.2000 -136.9600      36.2        15       147        60
OIR    2025130    131400  -11.2000 -136.9700      36.1        15       146        60
OIR    2025130    131400  -11.2000 -136.9800      35.8        14       145        60
OIR    2025130    131400  -11.2000 -136.9900      35.7        14       147        60
OIR    2025130    131400  -11.2000 -137.0000      35.6        14       149        60
OIR    2025130    131400  -11.2000 -137.0600      35.2        11       150        60
OIR    2025130    131400  -11.2000 -137.0700      35.2        10       149        60
OIR    2025130    131400  -11.2000 -137.0800      35.2        10       150        60
OIR    2025130    131400  -11.2000 -137.0900      35.2        10       150        60
OIR    2025130    131400  -11.2000 -137.1000      35.2        10       148        60
OIR    2025130    131400  -11.2000 -137.1100      35.3         9       148        60
OIR    2025130    131400  -11.2000 -137.1200      35.3         9       149        60
OIR    2025130    131400  -11.2000 -137.1300      35.4         9       148        60
OIR    2025130    131400  -11.2000 -137.1400      35.5         9       145        60
OIR    2025130    131400  -11.2000 -137.1500      35.6         8       145        60
OIR    2025130    131400  -11.2000 -137.1600      35.8         8       145        60
OIR    2025130    131400  -11.2000 -137.1700      35.9         7       146        60
OIR    2025130    131400  -11.2000 -137.1800      35.9         7       146        60
OIR    2025130    131400  -11.2000 -137.1900      36.1         6       145        60
OIR    2025130    131400  -11.2000 -137.2000      36.2         6       146        60
OIR    2025130    131400  -11.2000 -137.2100      36.4         6       148        60
OIR    2025130    131400  -11.2000 -137.2200      36.5         5       148        60
OIR    2025130    131400  -11.2000 -137.2300      36.6         5       148        60
OIR    2025130    131400  -11.2000 -137.2400      36.8         4       147        60
OIR    2025130    131400  -11.2000 -137.2500      36.9         4       147        60
OIR    2025130    131400  -11.2000 -137.2600      37.0         3       149        60
OIR    2025130    131400  -11.2000 -137.3400      38.6       359       150        60
OIR    2025130    131400  -11.2000 -137.3500      39.1       358       148        60
OIR    2025130    131400  -11.2000 -137.3600      39.4       357       147        60
OIR    2025130    131400  -11.2000 -137.3700      39.5       357       147        60
OIR    2025130    131400  -11.2000 -137.3800      39.6       357       146        60
OIR    2025130    131400  -11.2000 -137.3900      39.6       357       148        60
OIR    2025130    131400  -11.2000 -137.4100      39.6       356       150        60
OIR    2025130    131400  -11.2000 -137.4200      39.6       356       149        60
OIR    2025130    131400  -11.2000 -137.4300      39.7       356       146        60
OIR    2025130    131400  -11.2000 -137.4400      39.7       356       144        60
OIR    2025130    131400  -11.2000 -137.4500      39.7       356       144        60
OIR    2025130    131400  -11.2000 -137.4600      39.7       356       143        60
OIR    2025130    131400  -11.2000 -137.4700      39.7       356       143        60
OIR    2025130    131400  -11.2000 -137.4800      39.7       356       143        60
OIR    2025130    131400  -11.2000 -137.4900      39.7       356       143        60
OIR    2025130    131400  -11.2000 -137.5000      39.7       356       144        60
OIR    2025130    131400  -11.2000 -137.5100      39.7       356       145        60
OIR    2025130    131400  -11.2000 -137.5200      39.7       356       146        60
OIR    2025130    131400  -11.2000 -137.5300      39.7       356       146        60
OIR    2025130    131400  -11.2000 -137.5400      39.7       356       147        60
OIR    2025130    131400  -11.2000 -137.5500      39.7       356       147        60
OIR    2025130    131400  -11.2000 -137.5600      39.7       356       147        60
OIR    2025130    131400  -11.2000 -137.5700      39.7       356       149        60
OIR    2025130    131400  -11.2000 -137.6400      38.9       355       150        60
OIR    2025130    131400  -11.2000 -137.6500      38.4       354       149        60
OIR    2025130    131400  -11.2000 -137.6600      37.8       354       147        60
OIR    2025130    131400  -11.2000 -137.6700      37.2       353       148        60
OIR    2025130    131400  -11.2000 -137.6800      36.3       353       147        60
OIR    2025130    131400  -11.2000 -137.6900      34.9       352       147        60
OIR    2025130    131400  -11.2000 -137.7000      33.0       351       145        60
OIR    2025130    131400  -11.2000 -137.7100      31.6       350       144        60
OIR    2025130    131400  -11.2000 -137.7200      30.7       350       143        60
OIR    2025130    131400  -11.2000 -137.7300      29.8       350       142        60
OIR    2025130    131400  -11.2000 -137.7400      29.0       350       141        60
OIR    2025130    131400  -11.2000 -137.7500      28.5       350       139        60
OIR    2025130    131400  -11.2000 -137.7600      28.1       350       139        60
OIR    2025130    131400  -11.2000 -137.7700      27.9       350       138        60
OIR    2025130    131400  -11.2000 -137.7800      27.8       350       138        60
OIR    2025130    131400  -11.2000 -137.7900      27.8       350       138        60
OIR    2025130    131400  -11.2000 -137.8000      27.7       350       137        60
OIR    2025130    131400  -11.2000 -137.8100      27.7       350       137        60
OIR    2025130    131400  -11.2000 -137.8200      27.7       350       138        60
OIR    2025130    131400  -11.2000 -137.8300      27.6       350       137        60
OIR    2025130    131400  -11.2000 -137.8400      27.6       350       136        60
OIR    2025130    131400  -11.2000 -137.8500      27.6       350       136        60
OIR    2025130    131400  -11.2000 -137.8600      27.6       350       136        60
OIR    2025130    131400  -11.2000 -137.8700      27.5       350       137        60
OIR    2025130    131400  -11.2000 -137.8800      27.5       350       137        60
OIR    2025130    131400  -11.2000 -137.8900      27.5       350       136        60
OIR    2025130    131400  -11.2000 -137.9000      27.5       350       137        60
OIR    2025130    131400  -11.2000 -137.9100      27.5       350       138        60
OIR    2025130    131400  -11.2000 -137.9200      27.5       350       139        60
OIR    2025130    131400  -11.2000 -137.9300      27.4       350       138        60
OIR    2025130    131400  -11.2000 -137.9400      27.4       350       138        60
OIR    2025130    131400  -11.2000 -137.9500      27.4       350       137        60
OIR    2025130    131400  -11.2000 -137.9600      27.4       350       136        60
OIR    2025130    131400  -11.2000 -137.9700      27.4       350       135        60
OIR    2025130    131400  -11.2000 -137.9800      27.4       350       135        60
OIR    2025130    131400  -11.2000 -137.9900      27.4       350       135        60
OIR    2025130    131400  -11.2000 -138.0000      27.4       350       136        60
OIR    2025130    131400  -11.2000 -138.0100      27.4       350       137        60
OIR    2025130    131400  -11.2000 -138.0200      27.4       350       137        60
OIR    2025130    131400  -11.2000 -138.0300      27.4       350       137        60
OIR    2025130    131400  -11.2000 -138.0400      27.3       350       137        60
OIR    2025130    131400  -11.2000 -138.0500      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.0600      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.0700      27.3       350       139        60
OIR    2025130    131400  -11.2000 -138.0800      27.3       350       139        60
OIR    2025130    131400  -11.2000 -138.0900      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.1000      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.1100      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.1200      27.3       350       138        60
OIR    2025130    131400  -11.2000 -138.1300      27.3       351       138        60
OIR    2025130    131400  -11.2000 -138.1400      27.3       351       137        60
OIR    2025130    131400  -11.2000 -138.1500      27.3       351       135        60
OIR    2025130    131400  -11.2000 -138.1600      27.2       351       134        60
OIR    2025130    131400  -11.2000 -138.1700      27.2       351       133        60
OIR    2025130    131400  -11.2000 -138.1800      27.2       351       133        60
OIR    2025130    131400  -11.2000 -138.1900      27.1       351       134        60
OIR    2025130    131400  -11.2000 -138.2000      27.1       351       133        60
OIR    2025130    131400  -11.2000 -138.2100      27.0       351       133        60
OIR    2025130    131400  -11.2000 -138.2200      27.0       351       136        60
OIR    2025130    131400  -11.2000 -138.2300      26.9       351       138        60
OIR    2025130    131400  -11.2000 -138.2400      26.8       351       137        60
OIR    2025130    131400  -11.2000 -138.2500      26.7       351       137        60
OIR    2025130    131400  -11.2000 -138.2600      26.6       351       137        60
OIR    2025130    131400  -11.2000 -138.2700      26.2       352       136        60
OIR    2025130    131400  -11.2000 -138.2800      26.0       352       136        60
OIR    2025130    131400  -11.2000 -138.2900      25.7       353       136        60
OIR    2025130    131400  -11.2000 -138.3000      25.3       354       136        60
OIR    2025130    131400  -11.2000 -138.3100      25.0       355       137        60
OIR    2025130    131400  -11.2000 -138.3200      24.8       356       138        60
OIR    2025130    131400  -11.2000 -138.3300      24.7       357       140        60
OIR    2025130    131400  -11.2000 -138.3400      24.5       358       141        60
OIR    2025130    131400  -11.2000 -138.3500      24.5       359       142        60
OIR    2025130    131400  -11.2000 -138.3600      24.4       360       143        60
OIR    2025130    131400  -11.2000 -138.3700      24.3       360       144        60
OIR    2025130    131400  -11.2000 -138.3800      24.3         0       145        60
OIR    2025130    131400  -11.2000 -138.3900      24.3         1       147        60
OIR    2025130    131400  -11.2000 -138.4000      24.3         1       148        60
OIR    2025130    131400  -11.2000 -138.4100      24.3         1       148        60
OIR    2025130    131400  -11.2000 -138.4200      24.3         1       149        60
OIR    2025130    131400  -11.2000 -138.4300      24.3         2       149        60
OIR    2025130    131400  -11.2000 -138.4400      24.3         2       150        60
OIR    2025130    131400  -11.2100 -136.9500      35.9        15       151        60
OIR    2025130    131400  -11.2100 -136.9600      35.8        15       148        60
OIR    2025130    131400  -11.2100 -136.9700      35.6        15       147        60
OIR    2025130    131400  -11.2100 -136.9800      35.4        14       146        60
OIR    2025130    131400  -11.2100 -136.9900      35.2        14       148        60
OIR    2025130    131400  -11.2100 -137.0000      35.1        13       150        60
OIR    2025130    131400  -11.2100 -137.0700      34.8        10       150        60
OIR    2025130    131400  -11.2100 -137.0800      34.8        10       151        60
OIR    2025130    131400  -11.2100 -137.0900      34.8        10       151        60
OIR    2025130    131400  -11.2100 -137.1000      34.8         9       148        60
OIR    2025130    131400  -11.2100 -137.1100      34.9         9       150        60
OIR    2025130    131400  -11.2100 -137.1400      35.1         8       147        60
OIR    2025130    131400  -11.2100 -137.1500      35.1         8       147        60
OIR    2025130    131400  -11.2100 -137.1600      35.2         8       147        60
OIR    2025130    131400  -11.2100 -137.1700      35.3         7       147        60
OIR    2025130    131400  -11.2100 -137.1800      35.4         7       147        60
OIR    2025130    131400  -11.2100 -137.1900      35.5         6       147        60
OIR    2025130    131400  -11.2100 -137.2000      35.6         6       147        60
OIR    2025130    131400  -11.2100 -137.2100      35.8         5       147        60
OIR    2025130    131400  -11.2100 -137.2200      35.9         5       148        60
OIR    2025130    131400  -11.2100 -137.2300      36.1         4       148        60
OIR    2025130    131400  -11.2100 -137.2400      36.3         4       148        60
OIR    2025130    131400  -11.2100 -137.2500      36.4         4       147        60
OIR    2025130    131400  -11.2100 -137.2600      36.6         3       148        60
OIR    2025130    131400  -11.2100 -137.2700      36.7         3       149        60
OIR    2025130    131400  -11.2100 -137.3500      38.8       358       150        60
OIR    2025130    131400  -11.2100 -137.3600      39.2       357       148        60
OIR    2025130    131400  -11.2100 -137.3700      39.4       357       149        60
OIR    2025130    131400  -11.2100 -137.3800      39.5       357       150        60
OIR    2025130    131400  -11.2100 -137.4100      39.6       356       150        60
OIR    2025130    131400  -11.2100 -137.4200      39.6       356       148        60
OIR    2025130    131400  -11.2100 -137.4300      39.6       356       147        60
OIR    2025130    131400  -11.2100 -137.4400      39.7       356       146        60
OIR    2025130    131400  -11.2100 -137.4500      39.7       356       146        60
OIR    2025130    131400  -11.2100 -137.4600      39.7       356       146        60
OIR    2025130    131400  -11.2100 -137.4700      39.7       356       145        60
OIR    2025130    131400  -11.2100 -137.4800      39.7       356       145        60
OIR    2025130    131400  -11.2100 -137.4900      39.7       356       144        60
OIR    2025130    131400  -11.2100 -137.5000      39.7       356       145        60
OIR    2025130    131400  -11.2100 -137.5100      39.7       356       148        60
OIR    2025130    131400  -11.2100 -137.5200      39.7       356       147        60
OIR    2025130    131400  -11.2100 -137.5300      39.7       356       147        60
OIR    2025130    131400  -11.2100 -137.5400      39.7       356       148        60
OIR    2025130    131400  -11.2100 -137.5500      39.7       356       148        60
OIR    2025130    131400  -11.2100 -137.5600      39.7       356       149        60
OIR    2025130    131400  -11.2100 -137.6300      39.2       355       150        60
OIR    2025130    131400  -11.2100 -137.6400      38.7       355       149        60
OIR    2025130    131400  -11.2100 -137.6500      38.2       354       150        60
OIR    2025130    131400  -11.2100 -137.6600      37.7       354       150        60
OIR    2025130    131400  -11.2100 -137.6700      37.1       353       147        60
OIR    2025130    131400  -11.2100 -137.6800      36.3       353       147        60
OIR    2025130    131400  -11.2100 -137.6900      34.8       352       149        60
OIR    2025130    131400  -11.2100 -137.7000      32.7       351       149        60
OIR    2025130    131400  -11.2100 -137.7100      31.1       350       145        60
OIR    2025130    131400  -11.2100 -137.7200      30.0       350       144        60
OIR    2025130    131400  -11.2100 -137.7300      29.3       350       143        60
OIR    2025130    131400  -11.2100 -137.7400      28.7       350       142        60
OIR    2025130    131400  -11.2100 -137.7500      28.3       350       142        60
OIR    2025130    131400  -11.2100 -137.7600      28.0       350       140        60
OIR    2025130    131400  -11.2100 -137.7700      27.9       350       139        60
OIR    2025130    131400  -11.2100 -137.7800      27.8       350       140        60
OIR    2025130    131400  -11.2100 -137.7900      27.8       350       139        60
OIR    2025130    131400  -11.2100 -137.8000      27.7       350       139        60
OIR    2025130    131400  -11.2100 -137.8100      27.7       350       138        60
OIR    2025130    131400  -11.2100 -137.8200      27.7       350       139        60
OIR    2025130    131400  -11.2100 -137.8300      27.6       350       138        60
OIR    2025130    131400  -11.2100 -137.8400      27.6       350       138        60
OIR    2025130    131400  -11.2100 -137.8500      27.6       350       138        60
OIR    2025130    131400  -11.2100 -137.8600      27.6       350       138        60
OIR    2025130    131400  -11.2100 -137.8700      27.5       350       138        60
OIR    2025130    131400  -11.2100 -137.8800      27.5       350       138        60
OIR    2025130    131400  -11.2100 -137.8900      27.5       350       137        60
OIR    2025130    131400  -11.2100 -137.9000      27.5       350       137        60
OIR    2025130    131400  -11.2100 -137.9100      27.5       350       139        60
OIR    2025130    131400  -11.2100 -137.9200      27.5       350       140        60
OIR    2025130    131400  -11.2100 -137.9300      27.4       350       141        60
OIR    2025130    131400  -11.2100 -137.9400      27.4       350       139        60
OIR    2025130    131400  -11.2100 -137.9500      27.4       350       136        60
OIR    2025130    131400  -11.2100 -137.9600      27.4       350       136        60
OIR    2025130    131400  -11.2100 -137.9700      27.4       350       137        60
OIR    2025130    131400  -11.2100 -137.9800      27.4       350       137        60
OIR    2025130    131400  -11.2100 -137.9900      27.4       350       138        60
OIR    2025130    131400  -11.2100 -138.0000      27.4       350       139        60
OIR    2025130    131400  -11.2100 -138.0100      27.4       350       139        60
OIR    2025130    131400  -11.2100 -138.0200      27.4       350       138        60
OIR    2025130    131400  -11.2100 -138.0300      27.3       350       137        60
OIR    2025130    131400  -11.2100 -138.0400      27.3       350       138        60
OIR    2025130    131400  -11.2100 -138.0500      27.3       350       139        60
OIR    2025130    131400  -11.2100 -138.0600      27.3       350       139        60
OIR    2025130    131400  -11.2100 -138.0700      27.3       350       140        60
OIR    2025130    131400  -11.2100 -138.0800      27.3       350       139        60
OIR    2025130    131400  -11.2100 -138.0900      27.3       350       138        60
OIR    2025130    131400  -11.2100 -138.1000      27.3       350       138        60
OIR    2025130    131400  -11.2100 -138.1100      27.3       350       140        60
OIR    2025130    131400  -11.2100 -138.1200      27.3       350       140        60
OIR    2025130    131400  -11.2100 -138.1300      27.2       350       138        60
OIR    2025130    131400  -11.2100 -138.1400      27.2       350       136        60
OIR    2025130    131400  -11.2100 -138.1500      27.2       350       135        60
OIR    2025130    131400  -11.2100 -138.1600      27.2       350       134        60
OIR    2025130    131400  -11.2100 -138.1700      27.1       350       134        60
OIR    2025130    131400  -11.2100 -138.1800      27.0       351       134        60
OIR    2025130    131400  -11.2100 -138.1900      27.0       351       135        60
OIR    2025130    131400  -11.2100 -138.2000      26.9       351       136        60
OIR    2025130    131400  -11.2100 -138.2100      26.9       351       136        60
OIR    2025130    131400  -11.2100 -138.2200      26.8       351       137        60
OIR    2025130    131400  -11.2100 -138.2300      26.7       351       138        60
OIR    2025130    131400  -11.2100 -138.2400      26.6       351       136        60
OIR    2025130    131400  -11.2100 -138.2500      26.5       351       135        60
OIR    2025130    131400  -11.2100 -138.2600      26.2       351       135        60
OIR    2025130    131400  -11.2100 -138.2700      25.9       352       136        60
OIR    2025130    131400  -11.2100 -138.2800      25.7       352       136        60
OIR    2025130    131400  -11.2100 -138.2900      25.4       353       136        60
OIR    2025130    131400  -11.2100 -138.3000      24.9       354       137        60
OIR    2025130    131400  -11.2100 -138.3100      24.7       355       138        60
OIR    2025130    131400  -11.2100 -138.3200      24.6       356       139        60
OIR    2025130    131400  -11.2100 -138.3300      24.5       357       140        60
OIR    2025130    131400  -11.2100 -138.3400      24.3       358       140        60
OIR    2025130    131400  -11.2100 -138.3500      24.2       359       142        60
OIR    2025130    131400  -11.2100 -138.3600      24.1       359       143        60
OIR    2025130    131400  -11.2100 -138.3700      24.1       360       145        60
OIR    2025130    131400  -11.2100 -138.3800      24.1         0       147        60
OIR    2025130    131400  -11.2100 -138.3900      24.1         1       148        60
OIR    2025130    131400  -11.2100 -138.4000      24.1         1       148        60
OIR    2025130    131400  -11.2100 -138.4100      24.2         1       146        60
OIR    2025130    131400  -11.2100 -138.4200      24.2         1       148        60
OIR    2025130    131400  -11.2100 -140.1800      20.6       358       140        60
OIR    2025130    131400  -11.2200 -136.9600      34.9        14       150        60
OIR    2025130    131400  -11.2200 -136.9700      34.8        14       148        60
OIR    2025130    131400  -11.2200 -136.9800      34.7        14       148        60
OIR    2025130    131400  -11.2200 -136.9900      34.6        13       150        60
OIR    2025130    131400  -11.2200 -137.0700      34.5        10       151        60
OIR    2025130    131400  -11.2200 -137.1000      34.6         9       151        60
OIR    2025130    131400  -11.2200 -137.1400      34.9         8       148        60
OIR    2025130    131400  -11.2200 -137.1500      34.9         8       148        60
OIR    2025130    131400  -11.2200 -137.1600      34.9         8       148        60
OIR    2025130    131400  -11.2200 -137.1700      34.9         7       148        60
OIR    2025130    131400  -11.2200 -137.1800      35.0         7       148        60
OIR    2025130    131400  -11.2200 -137.1900      35.1         6       148        60
OIR    2025130    131400  -11.2200 -137.2000      35.2         6       147        60
OIR    2025130    131400  -11.2200 -137.2100      35.3         5       147        60
OIR    2025130    131400  -11.2200 -137.2200      35.4         5       147        60
OIR    2025130    131400  -11.2200 -137.2300      35.6         4       147        60
OIR    2025130    131400  -11.2200 -137.2400      35.8         4       146        60
OIR    2025130    131400  -11.2200 -137.2500      36.0         3       146        60
OIR    2025130    131400  -11.2200 -137.2600      36.2         3       147        60
OIR    2025130    131400  -11.2200 -137.2700      36.3         3       148        60
OIR    2025130    131400  -11.2200 -137.3800      39.5       357       151        60
OIR    2025130    131400  -11.2200 -137.3900      39.6       356       151        60
OIR    2025130    131400  -11.2200 -137.4000      39.6       356       151        60
OIR    2025130    131400  -11.2200 -137.4100      39.6       356       149        60
OIR    2025130    131400  -11.2200 -137.4200      39.6       356       148        60
OIR    2025130    131400  -11.2200 -137.4300      39.6       356       148        60
OIR    2025130    131400  -11.2200 -137.4400      39.7       356       148        60
OIR    2025130    131400  -11.2200 -137.4500      39.7       356       148        60
OIR    2025130    131400  -11.2200 -137.4600      39.7       356       148        60
OIR    2025130    131400  -11.2200 -137.4700      39.7       356       146        60
OIR    2025130    131400  -11.2200 -137.4800      39.7       356       145        60
OIR    2025130    131400  -11.2200 -137.4900      39.7       356       144        60
OIR    2025130    131400  -11.2200 -137.5000      39.7       356       145        60
OIR    2025130    131400  -11.2200 -137.5100      39.7       356       147        60
OIR    2025130    131400  -11.2200 -137.5200      39.7       356       147        60
OIR    2025130    131400  -11.2200 -137.5300      39.7       356       147        60
OIR    2025130    131400  -11.2200 -137.5400      39.7       356       148        60
OIR    2025130    131400  -11.2200 -137.5500      39.7       356       148        60
OIR    2025130    131400  -11.2200 -137.5600      39.7       356       150        60
OIR    2025130    131400  -11.2200 -137.6400      38.6       355       150        60
OIR    2025130    131400  -11.2200 -137.6700      37.1       354       148        60
OIR    2025130    131400  -11.2200 -137.6800      36.2       353       148        60
OIR    2025130    131400  -11.2200 -137.6900      34.4       352       149        60
OIR    2025130    131400  -11.2200 -137.7000      32.3       351       150        60
OIR    2025130    131400  -11.2200 -137.7100      30.5       350       147        60
OIR    2025130    131400  -11.2200 -137.7200      29.5       350       146        60
OIR    2025130    131400  -11.2200 -137.7300      28.9       350       145        60
OIR    2025130    131400  -11.2200 -137.7400      28.5       350       144        60
OIR    2025130    131400  -11.2200 -137.7500      28.2       350       142        60
OIR    2025130    131400  -11.2200 -137.7600      28.0       350       141        60
OIR    2025130    131400  -11.2200 -137.7700      27.9       350       140        60
OIR    2025130    131400  -11.2200 -137.7800      27.8       350       140        60
OIR    2025130    131400  -11.2200 -137.7900      27.7       350       140        60
OIR    2025130    131400  -11.2200 -137.8000      27.7       350       139        60
OIR    2025130    131400  -11.2200 -137.8100      27.7       350       139        60
OIR    2025130    131400  -11.2200 -137.8200      27.7       350       139        60
OIR    2025130    131400  -11.2200 -137.8300      27.6       350       139        60
OIR    2025130    131400  -11.2200 -137.8400      27.6       350       139        60
OIR    2025130    131400  -11.2200 -137.8500      27.6       350       139        60
OIR    2025130    131400  -11.2200 -137.8600      27.6       350       139        60
OIR    2025130    131400  -11.2200 -137.8700      27.5       350       139        60
OIR    2025130    131400  -11.2200 -137.8800      27.5       350       139        60
OIR    2025130    131400  -11.2200 -137.8900      27.5       350       137        60
OIR    2025130    131400  -11.2200 -137.9000      27.5       350       138        60
OIR    2025130    131400  -11.2200 -137.9100      27.5       350       139        60
OIR    2025130    131400  -11.2200 -137.9200      27.4       350       140        60
OIR    2025130    131400  -11.2200 -137.9300      27.4       350       140        60
OIR    2025130    131400  -11.2200 -137.9400      27.4       350       138        60
OIR    2025130    131400  -11.2200 -137.9500      27.4       350       137        60
OIR    2025130    131400  -11.2200 -137.9600      27.4       350       138        60
OIR    2025130    131400  -11.2200 -137.9700      27.4       350       139        60
OIR    2025130    131400  -11.2200 -137.9800      27.4       350       139        60
OIR    2025130    131400  -11.2200 -137.9900      27.4       350       140        60
OIR    2025130    131400  -11.2200 -138.0000      27.4       350       141        60
OIR    2025130    131400  -11.2200 -138.0100      27.3       350       141        60
OIR    2025130    131400  -11.2200 -138.0200      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0300      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0400      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0500      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0600      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0700      27.3       350       140        60
OIR    2025130    131400  -11.2200 -138.0800      27.2       350       140        60
OIR    2025130    131400  -11.2200 -138.0900      27.2       350       139        60
OIR    2025130    131400  -11.2200 -138.1000      27.1       350       138        60
OIR    2025130    131400  -11.2200 -138.1100      27.1       350       139        60
OIR    2025130    131400  -11.2200 -138.1200      26.9       350       139        60
OIR    2025130    131400  -11.2200 -138.1300      26.8       350       137        60
OIR    2025130    131400  -11.2200 -138.1400      26.8       350       135        60
OIR    2025130    131400  -11.2200 -138.1500      26.8       350       134        60
OIR    2025130    131400  -11.2200 -138.1600      26.8       350       135        60
OIR    2025130    131400  -11.2200 -138.1700      26.7       350       135        60
OIR    2025130    131400  -11.2200 -138.1800      26.6       350       136        60
OIR    2025130    131400  -11.2200 -138.1900      26.6       350       137        60
OIR    2025130    131400  -11.2200 -138.2000      26.6       350       137        60
OIR    2025130    131400  -11.2200 -138.2100      26.6       350       138        60
OIR    2025130    131400  -11.2200 -138.2200      26.5       350       139        60
OIR    2025130    131400  -11.2200 -138.2300      26.4       350       140        60
OIR    2025130    131400  -11.2200 -138.2400      26.2       350       138        60
OIR    2025130    131400  -11.2200 -138.2500      26.0       351       136        60
OIR    2025130    131400  -11.2200 -138.2600      25.6       351       136        60
OIR    2025130    131400  -11.2200 -138.2700      25.5       351       137        60
OIR    2025130    131400  -11.2200 -138.2800      25.2       352       138        60
OIR    2025130    131400  -11.2200 -138.2900      24.9       353       138        60
OIR    2025130    131400  -11.2200 -138.3000      24.5       354       138        60
OIR    2025130    131400  -11.2200 -138.3100      24.3       355       140        60
OIR    2025130    131400  -11.2200 -138.3200      24.2       356       141        60
OIR    2025130    131400  -11.2200 -138.3300      24.1       356       141        60
OIR    2025130    131400  -11.2200 -138.3400      24.0       358       141        60
OIR    2025130    131400  -11.2200 -138.3500      23.9       359       142        60
OIR    2025130    131400  -11.2200 -138.3600      23.8       359       144        60
OIR    2025130    131400  -11.2200 -138.3700      23.8       360       145        60
OIR    2025130    131400  -11.2200 -138.3800      23.8       360       147        60
OIR    2025130    131400  -11.2200 -138.3900      23.9         0       149        60
OIR    2025130    131400  -11.2200 -138.4000      23.9         1       148        60
OIR    2025130    131400  -11.2200 -138.4100      24.0         1       147        60
OIR    2025130    131400  -11.2200 -138.4200      24.0         1       149        60
OIR    2025130    131400  -11.2300 -136.9700      34.0        13       150        60
OIR    2025130    131400  -11.2300 -136.9800      34.0        13       150        60
OIR    2025130    131400  -11.2300 -137.0600      33.9        10       151        60
OIR    2025130    131400  -11.2300 -137.1200      34.4         9       149        60
OIR    2025130    131400  -11.2300 -137.1300      34.4         8       148        60
OIR    2025130    131400  -11.2300 -137.1400      34.5         8       148        60
OIR    2025130    131400  -11.2300 -137.1500      34.5         8       149        60
OIR    2025130    131400  -11.2300 -137.1600      34.5         8       150        60
OIR    2025130    131400  -11.2300 -137.1700      34.5         7       150        60
OIR    2025130    131400  -11.2300 -137.1800      34.4         7       149        60
OIR    2025130    131400  -11.2300 -137.1900      34.4         6       148        60
OIR    2025130    131400  -11.2300 -137.2000      34.5         6       147        60
OIR    2025130    131400  -11.2300 -137.2100      34.7         5       146        60
OIR    2025130    131400  -11.2300 -137.2200      35.0         5       145        60
OIR    2025130    131400  -11.2300 -137.2300      35.2         4       145        60
OIR    2025130    131400  -11.2300 -137.2400      35.4         4       144        60
OIR    2025130    131400  -11.2300 -137.2500      35.6         3       144        60
OIR    2025130    131400  -11.2300 -137.2600      35.8         3       146        60
OIR    2025130    131400  -11.2300 -137.2700      36.0         3       148        60
OIR    2025130    131400  -11.2300 -137.2800      36.2         2       150        60
OIR    2025130    131400  -11.2300 -137.3000      36.6         1       149        60
OIR    2025130    131400  -11.2300 -137.3100      36.8         1       148        60
OIR    2025130    131400  -11.2300 -137.3200      37.0         0       148        60
OIR    2025130    131400  -11.2300 -137.3300      37.3       359       150        60
OIR    2025130    131400  -11.2300 -137.3900      39.5       356       150        60
OIR    2025130    131400  -11.2300 -137.4000      39.6       356       149        60
OIR    2025130    131400  -11.2300 -137.4100      39.6       356       148        60
OIR    2025130    131400  -11.2300 -137.4200      39.6       356       148        60
OIR    2025130    131400  -11.2300 -137.4300      39.6       356       148        60
OIR    2025130    131400  -11.2300 -137.4400      39.6       356       149        60
OIR    2025130    131400  -11.2300 -137.4500      39.6       356       151        60
OIR    2025130    131400  -11.2300 -137.4600      39.7       356       149        60
OIR    2025130    131400  -11.2300 -137.4700      39.7       356       146        60
OIR    2025130    131400  -11.2300 -137.4800      39.7       356       145        60
OIR    2025130    131400  -11.2300 -137.4900      39.7       356       144        60
OIR    2025130    131400  -11.2300 -137.5000      39.7       356       144        60
OIR    2025130    131400  -11.2300 -137.5100      39.7       356       146        60
OIR    2025130    131400  -11.2300 -137.5200      39.7       356       146        60
OIR    2025130    131400  -11.2300 -137.5300      39.7       356       147        60
OIR    2025130    131400  -11.2300 -137.5400      39.7       356       147        60
OIR    2025130    131400  -11.2300 -137.5500      39.7       356       148        60
OIR    2025130    131400  -11.2300 -137.5600      39.7       356       151        60
OIR    2025130    131400  -11.2300 -137.6700      37.3       354       148        60
OIR    2025130    131400  -11.2300 -137.6800      36.3       353       148        60
OIR    2025130    131400  -11.2300 -137.6900      34.1       352       150        60
OIR    2025130    131400  -11.2300 -137.7000      31.9       351       150        60
OIR    2025130    131400  -11.2300 -137.7100      30.2       350       149        60
OIR    2025130    131400  -11.2300 -137.7200      29.2       350       149        60
OIR    2025130    131400  -11.2300 -137.7300      28.6       350       148        60
OIR    2025130    131400  -11.2300 -137.7400      28.3       350       145        60
OIR    2025130    131400  -11.2300 -137.7500      28.1       350       142        60
OIR    2025130    131400  -11.2300 -137.7600      27.9       350       142        60
OIR    2025130    131400  -11.2300 -137.7700      27.8       350       141        60
OIR    2025130    131400  -11.2300 -137.7800      27.8       350       141        60
OIR    2025130    131400  -11.2300 -137.7900      27.7       350       140        60
OIR    2025130    131400  -11.2300 -137.8000      27.7       350       140        60
OIR    2025130    131400  -11.2300 -137.8100      27.7       350       140        60
OIR    2025130    131400  -11.2300 -137.8200      27.7       350       139        60
OIR    2025130    131400  -11.2300 -137.8300      27.6       350       140        60
OIR    2025130    131400  -11.2300 -137.8400      27.6       350       140        60
OIR    2025130    131400  -11.2300 -137.8500      27.6       350       140        60
OIR    2025130    131400  -11.2300 -137.8600      27.5       350       141        60
OIR    2025130    131400  -11.2300 -137.8700      27.5       350       140        60
OIR    2025130    131400  -11.2300 -137.8800      27.5       350       139        60
OIR    2025130    131400  -11.2300 -137.8900      27.5       350       138        60
OIR    2025130    131400  -11.2300 -137.9000      27.5       350       138        60
OIR    2025130    131400  -11.2300 -137.9100      27.4       350       140        60
OIR    2025130    131400  -11.2300 -137.9200      27.4       350       140        60
OIR    2025130    131400  -11.2300 -137.9300      27.4       350       139        60
OIR    2025130    131400  -11.2300 -137.9400      27.4       350       138        60
OIR    2025130    131400  -11.2300 -137.9500      27.4       350       138        60
OIR    2025130    131400  -11.2300 -137.9600      27.4       350       140        60
OIR    2025130    131400  -11.2300 -137.9700      27.4       350       141        60
OIR    2025130    131400  -11.2300 -137.9800      27.4       350       141        60
OIR    2025130    131400  -11.2300 -137.9900      27.4       350       141        60
OIR    2025130    131400  -11.2300 -138.0000      27.4       350       143        60
OIR    2025130    131400  -11.2300 -138.0100      27.3       350       144        60
OIR    2025130    131400  -11.2300 -138.0200      27.3       350       143        60
OIR    2025130    131400  -11.2300 -138.0300      27.3       350       142        60
OIR    2025130    131400  -11.2300 -138.0400      27.3       350       142        60
OIR    2025130    131400  -11.2300 -138.0500      27.3       350       141        60
OIR    2025130    131400  -11.2300 -138.0600      27.2       350       141        60
OIR    2025130    131400  -11.2300 -138.0700      27.1       350       141        60
OIR    2025130    131400  -11.2300 -138.0800      26.9       350       142        60
OIR    2025130    131400  -11.2300 -138.0900      26.6       350       140        60
OIR    2025130    131400  -11.2300 -138.1000      26.3       349       138        60
OIR    2025130    131400  -11.2300 -138.1100      26.0       349       138        60
OIR    2025130    131400  -11.2300 -138.1200      25.7       349       137        60
OIR    2025130    131400  -11.2300 -138.1300      25.7       349       136        60
OIR    2025130    131400  -11.2300 -138.1400      25.7       349       135        60
OIR    2025130    131400  -11.2300 -138.1500      25.8       349       135        60
OIR    2025130    131400  -11.2300 -138.1600      25.8       349       135        60
OIR    2025130    131400  -11.2300 -138.1700      25.8       350       136        60
OIR    2025130    131400  -11.2300 -138.1800      25.8       350       137        60
OIR    2025130    131400  -11.2300 -138.1900      25.9       350       138        60
OIR    2025130    131400  -11.2300 -138.2000      26.0       350       139        60
OIR    2025130    131400  -11.2300 -138.2100      26.0       350       140        60
OIR    2025130    131400  -11.2300 -138.2200      26.0       350       141        60
OIR    2025130    131400  -11.2300 -138.2300      25.8       350       141        60
OIR    2025130    131400  -11.2300 -138.2400      25.5       350       139        60
OIR    2025130    131400  -11.2300 -138.2500      25.0       350       138        60
OIR    2025130    131400  -11.2300 -138.2600      24.8       351       137        60
OIR    2025130    131400  -11.2300 -138.2700      24.6       351       138        60
OIR    2025130    131400  -11.2300 -138.2800      24.2       352       140        60
OIR    2025130    131400  -11.2300 -138.2900      23.9       353       141        60
OIR    2025130    131400  -11.2300 -138.3000      23.6       354       140        60
OIR    2025130    131400  -11.2300 -138.3100      23.5       354       142        60
OIR    2025130    131400  -11.2300 -138.3200      23.5       355       143        60
OIR    2025130    131400  -11.2300 -138.3300      23.4       356       142        60
OIR    2025130    131400  -11.2300 -138.3400      23.3       357       142        60
OIR    2025130    131400  -11.2300 -138.3500      23.3       358       143        60
OIR    2025130    131400  -11.2300 -138.3600      23.3       359       145        60
OIR    2025130    131400  -11.2300 -138.3700      23.2       359       146        60
OIR    2025130    131400  -11.2300 -138.3800      23.2       359       147        60
OIR    2025130    131400  -11.2300 -138.3900      23.3       360       149        60
OIR    2025130    131400  -11.2300 -138.4000      23.5         0       149        60
OIR    2025130    131400  -11.2300 -138.4100      23.6         0       148        60
OIR    2025130    131400  -11.2300 -138.4200      23.7         1       149        60
OIR    2025130    131400  -11.2400 -137.1100      34.1         9       151        60
OIR    2025130    131400  -11.2400 -137.1200      34.2         9       149        60
OIR    2025130    131400  -11.2400 -137.1300      34.2         8       149        60
OIR    2025130    131400  -11.2400 -137.1400      34.2         8       148        60
OIR    2025130    131400  -11.2400 -137.1500      34.2         8       149        60
OIR    2025130    131400  -11.2400 -137.1600      34.1         7       150        60
OIR    2025130    131400  -11.2400 -137.1700      34.0         7       150        60
OIR    2025130    131400  -11.2400 -137.1800      33.9         6       151        60
OIR    2025130    131400  -11.2400 -137.1900      33.8         6       149        60
OIR    2025130    131400  -11.2400 -137.2000      33.9         5       148        60
OIR    2025130    131400  -11.2400 -137.2100      34.1         5       146        60
OIR    2025130    131400  -11.2400 -137.2200      34.3         4       146        60
OIR    2025130    131400  -11.2400 -137.2300      34.6         4       146        60
OIR    2025130    131400  -11.2400 -137.2400      34.9         4       146        60
OIR    2025130    131400  -11.2400 -137.2500      35.1         3       145        60
OIR    2025130    131400  -11.2400 -137.2600      35.3         3       146        60
OIR    2025130    131400  -11.2400 -137.2700      35.5         2       147        60
OIR    2025130    131400  -11.2400 -137.2800      35.7         2       148        60
OIR    2025130    131400  -11.2400 -137.2900      35.8         2       149        60
OIR    2025130    131400  -11.2400 -137.3000      36.0         1       149        60
OIR    2025130    131400  -11.2400 -137.3100      36.2         1       149        60
OIR    2025130    131400  -11.2400 -137.3200      36.4       360       150        60
OIR    2025130    131400  -11.2400 -137.3300      36.8       359       151        60
OIR    2025130    131400  -11.2400 -137.4100      39.6       356       149        60
OIR    2025130    131400  -11.2400 -137.4200      39.6       356       147        60
OIR    2025130    131400  -11.2400 -137.4300      39.6       356       148        60
OIR    2025130    131400  -11.2400 -137.4400      39.6       356       149        60
OIR    2025130    131400  -11.2400 -137.4500      39.6       356       149        60
OIR    2025130    131400  -11.2400 -137.4600      39.6       356       147        60
OIR    2025130    131400  -11.2400 -137.4700      39.6       356       145        60
OIR    2025130    131400  -11.2400 -137.4800      39.6       356       143        60
OIR    2025130    131400  -11.2400 -137.4900      39.6       356       141        60
OIR    2025130    131400  -11.2400 -137.5000      39.6       356       141        60
OIR    2025130    131400  -11.2400 -137.5100      39.6       356       142        60
OIR    2025130    131400  -11.2400 -137.5200      39.7       356       144        60
OIR    2025130    131400  -11.2400 -137.5300      39.7       356       145        60
OIR    2025130    131400  -11.2400 -137.5400      39.7       356       145        60
OIR    2025130    131400  -11.2400 -137.5500      39.7       356       145        60
OIR    2025130    131400  -11.2400 -137.5600      39.7       356       146        60
OIR    2025130    131400  -11.2400 -137.5700      39.7       356       146        60
OIR    2025130    131400  -11.2400 -137.5800      39.7       356       147        60
OIR    2025130    131400  -11.2400 -137.5900      39.7       356       149        60
OIR    2025130    131400  -11.2400 -137.6400      38.4       355       150        60
OIR    2025130    131400  -11.2400 -137.6500      38.0       355       151        60
OIR    2025130    131400  -11.2400 -137.6600      37.7       355       150        60
OIR    2025130    131400  -11.2400 -137.6700      37.4       354       147        60
OIR    2025130    131400  -11.2400 -137.6800      36.6       354       148        60
OIR    2025130    131400  -11.2400 -137.7100      30.2       350       149        60
OIR    2025130    131400  -11.2400 -137.7200      28.9       350       149        60
OIR    2025130    131400  -11.2400 -137.7300      28.5       350       148        60
OIR    2025130    131400  -11.2400 -137.7400      28.2       350       146        60
OIR    2025130    131400  -11.2400 -137.7500      28.0       350       144        60
OIR    2025130    131400  -11.2400 -137.7600      27.9       350       144        60
OIR    2025130    131400  -11.2400 -137.7700      27.8       350       143        60
OIR    2025130    131400  -11.2400 -137.7800      27.8       350       143        60
OIR    2025130    131400  -11.2400 -137.7900      27.7       350       142        60
OIR    2025130    131400  -11.2400 -137.8000      27.7       350       142        60
OIR    2025130    131400  -11.2400 -137.8100      27.7       350       141        60
OIR    2025130    131400  -11.2400 -137.8200      27.7       350       141        60
OIR    2025130    131400  -11.2400 -137.8300      27.6       350       140        60
OIR    2025130    131400  -11.2400 -137.8400      27.6       350       140        60
OIR    2025130    131400  -11.2400 -137.8500      27.6       350       141        60
OIR    2025130    131400  -11.2400 -137.8600      27.5       350       141        60
OIR    2025130    131400  -11.2400 -137.8700      27.5       350       140        60
OIR    2025130    131400  -11.2400 -137.8800      27.5       350       140        60
OIR    2025130    131400  -11.2400 -137.8900      27.5       350       140        60
OIR    2025130    131400  -11.2400 -137.9000      27.5       350       140        60
OIR    2025130    131400  -11.2400 -137.9100      27.4       350       140        60
OIR    2025130    131400  -11.2400 -137.9200      27.4       350       141        60
OIR    2025130    131400  -11.2400 -137.9300      27.4       350       141        60
OIR    2025130    131400  -11.2400 -137.9400      27.4       350       141        60
OIR    2025130    131400  -11.2400 -137.9500      27.4       350       140        60
OIR    2025130    131400  -11.2400 -137.9600      27.4       350       141        60
OIR    2025130    131400  -11.2400 -137.9700      27.4       350       142        60
OIR    2025130    131400  -11.2400 -137.9800      27.4       350       143        60
OIR    2025130    131400  -11.2400 -137.9900      27.3       350       144        60
OIR    2025130    131400  -11.2400 -138.0000      27.3       350       146        60
OIR    2025130    131400  -11.2400 -138.0100      27.3       350       147        60
OIR    2025130    131400  -11.2400 -138.0200      27.3       350       147        60
OIR    2025130    131400  -11.2400 -138.0300      27.3       350       147        60
OIR    2025130    131400  -11.2400 -138.0400      27.3       350       146        60
OIR    2025130    131400  -11.2400 -138.0500      27.2       350       145        60
OIR    2025130    131400  -11.2400 -138.0600      27.0       350       144        60
OIR    2025130    131400  -11.2400 -138.0700      26.6       350       143        60
OIR    2025130    131400  -11.2400 -138.0800      26.2       349       143        60
OIR    2025130    131400  -11.2400 -138.0900      25.8       349       141        60
OIR    2025130    131400  -11.2400 -138.1000      25.4       349       139        60
OIR    2025130    131400  -11.2400 -138.1100      25.2       349       138        60
OIR    2025130    131400  -11.2400 -138.1200      25.1       349       137        60
OIR    2025130    131400  -11.2400 -138.1300      25.1       349       137        60
OIR    2025130    131400  -11.2400 -138.1400      25.1       349       137        60
OIR    2025130    131400  -11.2400 -138.1500      25.1       349       137        60
OIR    2025130    131400  -11.2400 -138.1600      25.2       349       137        60
OIR    2025130    131400  -11.2400 -138.1700      25.2       349       137        60
OIR    2025130    131400  -11.2400 -138.1800      25.2       349       138        60
OIR    2025130    131400  -11.2400 -138.1900      25.2       349       139        60
OIR    2025130    131400  -11.2400 -138.2000      25.2       350       141        60
OIR    2025130    131400  -11.2400 -138.2100      25.2       350       142        60
OIR    2025130    131400  -11.2400 -138.2200      25.2       350       143        60
OIR    2025130    131400  -11.2400 -138.2300      24.9       350       143        60
OIR    2025130    131400  -11.2400 -138.2400      24.5       350       142        60
OIR    2025130    131400  -11.2400 -138.2500      24.1       350       140        60
OIR    2025130    131400  -11.2400 -138.2600      23.9       350       140        60
OIR    2025130    131400  -11.2400 -138.2700      23.7       351       141        60
OIR    2025130    131400  -11.2400 -138.2800      23.4       352       142        60
OIR    2025130    131400  -11.2400 -138.2900      23.2       353       141        60
OIR    2025130    131400  -11.2400 -138.3000      23.1       354       140        60
OIR    2025130    131400  -11.2400 -138.3100      23.0       354       142        60
OIR    2025130    131400  -11.2400 -138.3200      22.9       355       144        60
OIR    2025130    131400  -11.2400 -138.3300      22.9       356       144        60
OIR    2025130    131400  -11.2400 -138.3400      22.9       356       144        60
OIR    2025130    131400  -11.2400 -138.3500      22.8       357       146        60
OIR    2025130    131400  -11.2400 -138.3600      22.6       358       148        60
OIR    2025130    131400  -11.2400 -138.3700      22.6       358       149        60
OIR    2025130    131400  -11.2400 -138.4100      23.1       360       149        60
OIR    2025130    131400  -11.2500 -137.0700      33.3        10       152        60
OIR    2025130    131400  -11.2500 -137.0800      33.4        10       151        60
OIR    2025130    131400  -11.2500 -137.0900      33.5         9       151        60
OIR    2025130    131400  -11.2500 -137.1000      33.6         9       151        60
OIR    2025130    131400  -11.2500 -137.1100      33.6         9       151        60
OIR    2025130    131400  -11.2500 -137.1200      33.7         9       150        60
OIR    2025130    131400  -11.2500 -137.1300      33.8         8       149        60
OIR    2025130    131400  -11.2500 -137.1400      33.9         8       148        60
OIR    2025130    131400  -11.2500 -137.1500      33.8         8       149        60
OIR    2025130    131400  -11.2500 -137.1600      33.6         7       150        60
OIR    2025130    131400  -11.2500 -137.1700      33.3         7       151        60
OIR    2025130    131400  -11.2500 -137.1800      33.2         6       152        60
OIR    2025130    131400  -11.2500 -137.1900      33.2         6       151        60
OIR    2025130    131400  -11.2500 -137.2000      33.3         5       149        60
OIR    2025130    131400  -11.2500 -137.2100      33.4         5       146        60
OIR    2025130    131400  -11.2500 -137.2200      33.6         4       146        60
OIR    2025130    131400  -11.2500 -137.2300      33.9         4       148        60
OIR    2025130    131400  -11.2500 -137.2400      34.3         3       147        60
OIR    2025130    131400  -11.2500 -137.2500      34.5         3       146        60
OIR    2025130    131400  -11.2500 -137.2600      34.8         3       146        60
OIR    2025130    131400  -11.2500 -137.2700      35.0         2       146        60
OIR    2025130    131400  -11.2500 -137.2800      35.2         2       146        60
OIR    2025130    131400  -11.2500 -137.2900      35.4         2       147        60
OIR    2025130    131400  -11.2500 -137.3000      35.5         1       149        60
OIR    2025130    131400  -11.2500 -137.3100      35.6         1       151        60
OIR    2025130    131400  -11.2500 -137.3600      37.9       357       151        60
OIR    2025130    131400  -11.2500 -137.4100      39.5       356       149        60
OIR    2025130    131400  -11.2500 -137.4200      39.5       356       146        60
OIR    2025130    131400  -11.2500 -137.4300      39.5       356       149        60
OIR    2025130    131400  -11.2500 -137.4400      39.6       356       150        60
OIR    2025130    131400  -11.2500 -137.4500      39.5       356       147        60
OIR    2025130    131400  -11.2500 -137.4600      39.5       356       145        60
OIR    2025130    131400  -11.2500 -137.4700      39.5       356       143        60
OIR    2025130    131400  -11.2500 -137.4800      39.4       356       141        60
OIR    2025130    131400  -11.2500 -137.4900      39.4       356       138        60
OIR    2025130    131400  -11.2500 -137.5000      39.4       356       138        60
OIR    2025130    131400  -11.2500 -137.5100      39.5       356       139        60
OIR    2025130    131400  -11.2500 -137.5200      39.5       356       142        60
OIR    2025130    131400  -11.2500 -137.5300      39.6       356       144        60
OIR    2025130    131400  -11.2500 -137.5400      39.7       356       143        60
OIR    2025130    131400  -11.2500 -137.5500      39.7       356       142        60
OIR    2025130    131400  -11.2500 -137.5600      39.7       356       140        60
OIR    2025130    131400  -11.2500 -137.5700      39.7       356       139        60
OIR    2025130    131400  -11.2500 -137.5800      39.6       356       140        60
OIR    2025130    131400  -11.2500 -137.5900      39.6       356       142        60
OIR    2025130    131400  -11.2500 -137.6000      39.5       356       145        60
OIR    2025130    131400  -11.2500 -137.6100      39.3       356       146        60
OIR    2025130    131400  -11.2500 -137.6200      39.1       355       148        60
OIR    2025130    131400  -11.2500 -137.6300      38.7       355       148        60
OIR    2025130    131400  -11.2500 -137.6400      38.2       355       148        60
OIR    2025130    131400  -11.2500 -137.6500      37.9       355       149        60
OIR    2025130    131400  -11.2500 -137.6600      37.7       355       149        60
OIR    2025130    131400  -11.2500 -137.6700      37.5       354       146        60
OIR    2025130    131400  -11.2500 -137.6800      36.8       354       148        60
OIR    2025130    131400  -11.2500 -137.7100      30.2       351       149        60
OIR    2025130    131400  -11.2500 -137.7200      28.8       350       149        60
OIR    2025130    131400  -11.2500 -137.7300      28.4       350       149        60
OIR    2025130    131400  -11.2500 -137.7400      28.1       350       148        60
OIR    2025130    131400  -11.2500 -137.7500      28.0       350       147        60
OIR    2025130    131400  -11.2500 -137.7600      27.9       350       147        60
OIR    2025130    131400  -11.2500 -137.7700      27.8       350       146        60
OIR    2025130    131400  -11.2500 -137.7800      27.8       350       145        60
OIR    2025130    131400  -11.2500 -137.7900      27.7       350       144        60
OIR    2025130    131400  -11.2500 -137.8000      27.7       350       143        60
OIR    2025130    131400  -11.2500 -137.8100      27.7       350       143        60
OIR    2025130    131400  -11.2500 -137.8200      27.7       350       142        60
OIR    2025130    131400  -11.2500 -137.8300      27.6       350       141        60
OIR    2025130    131400  -11.2500 -137.8400      27.6       350       141        60
OIR    2025130    131400  -11.2500 -137.8500      27.6       350       141        60
OIR    2025130    131400  -11.2500 -137.8600      27.5       350       141        60
OIR    2025130    131400  -11.2500 -137.8700      27.5       350       141        60
OIR    2025130    131400  -11.2500 -137.8800      27.5       350       141        60
OIR    2025130    131400  -11.2500 -137.8900      27.5       350       142        60
OIR    2025130    131400  -11.2500 -137.9000      27.4       350       142        60
OIR    2025130    131400  -11.2500 -137.9100      27.4       350       141        60
OIR    2025130    131400  -11.2500 -137.9200      27.4       350       142        60
OIR    2025130    131400  -11.2500 -137.9300      27.4       350       144        60
OIR    2025130    131400  -11.2500 -137.9400      27.4       350       143        60
OIR    2025130    131400  -11.2500 -137.9500      27.4       350       142        60
OIR    2025130    131400  -11.2500 -137.9600      27.4       350       143        60
OIR    2025130    131400  -11.2500 -137.9700      27.4       350       144        60
OIR    2025130    131400  -11.2500 -137.9800      27.3       350       145        60
OIR    2025130    131400  -11.2500 -137.9900      27.3       350       146        60
OIR    2025130    131400  -11.2500 -138.0000      27.3       350       149        60
OIR    2025130    131400  -11.2500 -138.0100      27.3       350       150        60
OIR    2025130    131400  -11.2500 -138.0200      27.3       350       150        60
OIR    2025130    131400  -11.2500 -138.0300      27.3       350       150        60
OIR    2025130    131400  -11.2500 -138.0400      27.1       350       148        60
OIR    2025130    131400  -11.2500 -138.0500      26.8       350       147        60
OIR    2025130    131400  -11.2500 -138.0600      26.4       350       146        60
OIR    2025130    131400  -11.2500 -138.0700      25.8       349       145        60
OIR    2025130    131400  -11.2500 -138.0800      25.5       349       145        60
OIR    2025130    131400  -11.2500 -138.0900      25.2       349       142        60
OIR    2025130    131400  -11.2500 -138.1000      25.1       349       140        60
OIR    2025130    131400  -11.2500 -138.1100      25.0       349       138        60
OIR    2025130    131400  -11.2500 -138.1200      25.0       349       138        60
OIR    2025130    131400  -11.2500 -138.1300      25.0       349       138        60
OIR    2025130    131400  -11.2500 -138.1400      25.0       349       139        60
OIR    2025130    131400  -11.2500 -138.1500      25.0       349       138        60
OIR    2025130    131400  -11.2500 -138.1600      25.0       349       138        60
OIR    2025130    131400  -11.2500 -138.1700      25.1       349       137        60
OIR    2025130    131400  -11.2500 -138.1800      25.1       349       138        60
OIR    2025130    131400  -11.2500 -138.1900      25.0       349       140        60
OIR    2025130    131400  -11.2500 -138.2000      24.9       349       142        60
OIR    2025130    131400  -11.2500 -138.2100      24.8       349       144        60
OIR    2025130    131400  -11.2500 -138.2200      24.6       349       145        60
OIR    2025130    131400  -11.2500 -138.2300      24.3       350       145        60
OIR    2025130    131400  -11.2500 -138.2400      23.8       350       144        60
OIR    2025130    131400  -11.2500 -138.2500      23.6       350       143        60
OIR    2025130    131400  -11.2500 -138.2600      23.2       351       142        60
OIR    2025130    131400  -11.2500 -138.2700      22.8       351       142        60
OIR    2025130    131400  -11.2500 -138.2800      22.5       352       143        60
OIR    2025130    131400  -11.2500 -138.2900      22.4       353       142        60
OIR    2025130    131400  -11.2500 -138.3000      22.3       353       141        60
OIR    2025130    131400  -11.2500 -138.3100      22.2       354       144        60
OIR    2025130    131400  -11.2500 -138.3200      22.1       355       146        60
OIR    2025130    131400  -11.2500 -138.3300      22.1       355       146        60
OIR    2025130    131400  -11.2500 -138.3400      22.1       356       146        60
OIR    2025130    131400  -11.2500 -138.3500      22.1       357       148        60
OIR    2025130    131400  -11.2500 -138.4100      22.5       359       150        60
OIR    2025130    131400  -11.2600 -137.1300      32.7         8       151        60
OIR    2025130    131400  -11.2600 -137.1400      32.7         8       151        60
OIR    2025130    131400  -11.2600 -137.1500      32.6         7       150        60
OIR    2025130    131400  -11.2600 -137.1600      32.4         7       149        60
OIR    2025130    131400  -11.2600 -137.1700      31.9         6       150        60
OIR    2025130    131400  -11.2600 -137.1800      31.5         5       151        60
OIR    2025130    131400  -11.2600 -137.1900      31.3         5       150        60
OIR    2025130    131400  -11.2600 -137.2000      31.4         4       148        60
OIR    2025130    131400  -11.2600 -137.2100      31.7         4       147        60
OIR    2025130    131400  -11.2600 -137.2200      32.3         4       147        60
OIR    2025130    131400  -11.2600 -137.2300      32.8         3       148        60
OIR    2025130    131400  -11.2600 -137.2400      33.3         3       149        60
OIR    2025130    131400  -11.2600 -137.2500      33.6         3       150        60
OIR    2025130    131400  -11.2600 -137.2600      33.8         2       149        60
OIR    2025130    131400  -11.2600 -137.2700      34.1         2       148        60
OIR    2025130    131400  -11.2600 -137.2800      34.3         2       149        60
OIR    2025130    131400  -11.2600 -137.2900      34.4         2       150        60
OIR    2025130    131400  -11.2600 -137.4100      39.5       356       147        60
OIR    2025130    131400  -11.2600 -137.4200      39.5       356       145        60
OIR    2025130    131400  -11.2600 -137.4300      39.5       356       146        60
OIR    2025130    131400  -11.2600 -137.4400      39.5       356       146        60
OIR    2025130    131400  -11.2600 -137.4500      39.4       356       146        60
OIR    2025130    131400  -11.2600 -137.4600      39.4       356       145        60
OIR    2025130    131400  -11.2600 -137.4700      39.2       356       144        60
OIR    2025130    131400  -11.2600 -137.4800      39.1       356       141        60
OIR    2025130    131400  -11.2600 -137.4900      39.0       356       138        60
OIR    2025130    131400  -11.2600 -137.5000      39.1       356       140        60
OIR    2025130    131400  -11.2600 -137.5100      39.2       356       142        60
OIR    2025130    131400  -11.2600 -137.5200      39.4       356       144        60
OIR    2025130    131400  -11.2600 -137.5300      39.6       356       144        60
OIR    2025130    131400  -11.2600 -137.5400      39.6       356       142        60
OIR    2025130    131400  -11.2600 -137.5500      39.7       356       141        60
OIR    2025130    131400  -11.2600 -137.5600      39.7       356       140        60
OIR    2025130    131400  -11.2600 -137.5700      39.7       356       139        60
OIR    2025130    131400  -11.2600 -137.5800      39.6       356       139        60
OIR    2025130    131400  -11.2600 -137.5900      39.5       356       140        60
OIR    2025130    131400  -11.2600 -137.6000      39.4       356       140        60
OIR    2025130    131400  -11.2600 -137.6100      39.2       356       141        60
OIR    2025130    131400  -11.2600 -137.6200      38.9       355       142        60
OIR    2025130    131400  -11.2600 -137.6300      38.5       355       143        60
OIR    2025130    131400  -11.2600 -137.6400      38.1       355       144        60
OIR    2025130    131400  -11.2600 -137.6500      37.9       355       145        60
OIR    2025130    131400  -11.2600 -137.6600      37.7       355       147        60
OIR    2025130    131400  -11.2600 -137.6700      37.5       355       146        60
OIR    2025130    131400  -11.2600 -137.6800      37.0       354       148        60
OIR    2025130    131400  -11.2600 -137.6900      35.3       353       150        60
OIR    2025130    131400  -11.2600 -137.7000      32.8       352       151        60
OIR    2025130    131400  -11.2600 -137.7300      28.4       350       151        60
OIR    2025130    131400  -11.2600 -137.7400      28.1       350       151        60
OIR    2025130    131400  -11.2600 -137.7500      28.0       350       151        60
OIR    2025130    131400  -11.2600 -137.7600      27.9       350       149        60
OIR    2025130    131400  -11.2600 -137.7700      27.8       350       148        60
OIR    2025130    131400  -11.2600 -137.7800      27.8       350       148        60
OIR    2025130    131400  -11.2600 -137.7900      27.7       350       147        60
OIR    2025130    131400  -11.2600 -137.8000      27.7       350       145        60
OIR    2025130    131400  -11.2600 -137.8100      27.7       350       144        60
OIR    2025130    131400  -11.2600 -137.8200      27.7       350       143        60
OIR    2025130    131400  -11.2600 -137.8300      27.6       350       142        60
OIR    2025130    131400  -11.2600 -137.8400      27.6       350       141        60
OIR    2025130    131400  -11.2600 -137.8500      27.6       350       142        60
OIR    2025130    131400  -11.2600 -137.8600      27.5       350       143        60
OIR    2025130    131400  -11.2600 -137.8700      27.5       350       142        60
OIR    2025130    131400  -11.2600 -137.8800      27.5       350       142        60
OIR    2025130    131400  -11.2600 -137.8900      27.4       350       144        60
OIR    2025130    131400  -11.2600 -137.9000      27.4       350       145        60
OIR    2025130    131400  -11.2600 -137.9100      27.4       350       144        60
OIR    2025130    131400  -11.2600 -137.9200      27.4       350       145        60
OIR    2025130    131400  -11.2600 -137.9300      27.4       350       147        60
OIR    2025130    131400  -11.2600 -137.9400      27.4       350       145        60
OIR    2025130    131400  -11.2600 -137.9500      27.4       350       144        60
OIR    2025130    131400  -11.2600 -137.9600      27.4       350       146        60
OIR    2025130    131400  -11.2600 -137.9700      27.4       350       149        60
OIR    2025130    131400  -11.2600 -137.9800      27.3       350       148        60
OIR    2025130    131400  -11.2600 -137.9900      27.3       350       147        60
OIR    2025130    131400  -11.2600 -138.0000      27.3       350       150        60
OIR    2025130    131400  -11.2600 -138.0100      27.3       350       150        60
OIR    2025130    131400  -11.2600 -138.0200      27.3       350       149        60
OIR    2025130    131400  -11.2600 -138.0300      27.1       350       147        60
OIR    2025130    131400  -11.2600 -138.0400      26.9       350       146        60
OIR    2025130    131400  -11.2600 -138.0500      26.4       350       145        60
OIR    2025130    131400  -11.2600 -138.0600      25.8       349       145        60
OIR    2025130    131400  -11.2600 -138.0700      25.4       349       145        60
OIR    2025130    131400  -11.2600 -138.0800      25.2       349       145        60
OIR    2025130    131400  -11.2600 -138.0900      25.1       349       143        60
OIR    2025130    131400  -11.2600 -138.1000      25.0       349       142        60
OIR    2025130    131400  -11.2600 -138.1100      25.0       349       141        60
OIR    2025130    131400  -11.2600 -138.1200      25.0       349       141        60
OIR    2025130    131400  -11.2600 -138.1300      25.0       349       141        60
OIR    2025130    131400  -11.2600 -138.1400      25.0       349       140        60
OIR    2025130    131400  -11.2600 -138.1500      25.0       349       139        60
OIR    2025130    131400  -11.2600 -138.1600      25.0       349       138        60
OIR    2025130    131400  -11.2600 -138.1700      25.0       349       138        60
OIR    2025130    131400  -11.2600 -138.1800      24.9       349       139        60
OIR    2025130    131400  -11.2600 -138.1900      24.9       349       141        60
OIR    2025130    131400  -11.2600 -138.2000      24.8       349       142        60
OIR    2025130    131400  -11.2600 -138.2100      24.6       349       143        60
OIR    2025130    131400  -11.2600 -138.2200      24.3       349       144        60
OIR    2025130    131400  -11.2600 -138.2300      23.9       350       145        60
OIR    2025130    131400  -11.2600 -138.2400      23.4       350       145        60
OIR    2025130    131400  -11.2600 -138.2500      23.0       350       143        60
OIR    2025130    131400  -11.2600 -138.2600      22.6       351       141        60
OIR    2025130    131400  -11.2600 -138.2700      22.2       352       142        60
OIR    2025130    131400  -11.2600 -138.2800      22.0       352       144        60
OIR    2025130    131400  -11.2600 -138.2900      21.9       353       144        60
OIR    2025130    131400  -11.2600 -138.3000      21.8       353       143        60
OIR    2025130    131400  -11.2600 -138.3100      21.7       354       147        60
OIR    2025130    131400  -11.2600 -138.3200      21.6       355       149        60
OIR    2025130    131400  -11.2600 -138.3300      21.6       355       148        60
OIR    2025130    131400  -11.2600 -138.3400      21.6       356       148        60
OIR    2025130    131400  -11.2600 -138.3500      21.7       356       150        60
OIR    2025130    131400  -11.2700 -137.1500      30.1         6       150        60
OIR    2025130    131400  -11.2700 -137.1600      29.8         5       148        60
OIR    2025130    131400  -11.2700 -137.1700      29.3         5       149        60
OIR    2025130    131400  -11.2700 -137.1800      28.7         4       151        60
OIR    2025130    131400  -11.2700 -137.1900      28.3         3       149        60
OIR    2025130    131400  -11.2700 -137.2000      28.3         3       147        60
OIR    2025130    131400  -11.2700 -137.2100      28.5         3       147        60
OIR    2025130    131400  -11.2700 -137.2200      29.0         2       147        60
OIR    2025130    131400  -11.2700 -137.2300      29.6         2       148        60
OIR    2025130    131400  -11.2700 -137.2400      30.1         2       150        60
OIR    2025130    131400  -11.2700 -137.2700      30.5         1       151        60
OIR    2025130    131400  -11.2700 -137.3900      39.1       356       152        60
OIR    2025130    131400  -11.2700 -137.4000      39.4       356       151        60
OIR    2025130    131400  -11.2700 -137.4100      39.5       356       147        60
OIR    2025130    131400  -11.2700 -137.4200      39.5       356       144        60
OIR    2025130    131400  -11.2700 -137.4300      39.5       356       145        60
OIR    2025130    131400  -11.2700 -137.4400      39.4       356       145        60
OIR    2025130    131400  -11.2700 -137.4500      39.2       356       145        60
OIR    2025130    131400  -11.2700 -137.4600      39.1       356       145        60
OIR    2025130    131400  -11.2700 -137.4700      39.0       356       144        60
OIR    2025130    131400  -11.2700 -137.4800      38.9       356       142        60
OIR    2025130    131400  -11.2700 -137.4900      38.9       356       140        60
OIR    2025130    131400  -11.2700 -137.5000      38.9       356       142        60
OIR    2025130    131400  -11.2700 -137.5100      39.0       356       146        60
OIR    2025130    131400  -11.2700 -137.5200      39.2       356       146        60
OIR    2025130    131400  -11.2700 -137.5300      39.5       356       145        60
OIR    2025130    131400  -11.2700 -137.5400      39.6       356       143        60
OIR    2025130    131400  -11.2700 -137.5500      39.7       356       141        60
OIR    2025130    131400  -11.2700 -137.5600      39.7       356       140        60
OIR    2025130    131400  -11.2700 -137.5700      39.6       356       139        60
OIR    2025130    131400  -11.2700 -137.5800      39.6       356       139        60
OIR    2025130    131400  -11.2700 -137.5900      39.4       356       139        60
OIR    2025130    131400  -11.2700 -137.6000      39.1       356       138        60
OIR    2025130    131400  -11.2700 -137.6100      38.9       355       138        60
OIR    2025130    131400  -11.2700 -137.6200      38.5       355       139        60
OIR    2025130    131400  -11.2700 -137.6300      38.2       355       139        60
OIR    2025130    131400  -11.2700 -137.6400      38.0       355       141        60
OIR    2025130    131400  -11.2700 -137.6500      37.9       355       143        60
OIR    2025130    131400  -11.2700 -137.6600      37.8       355       145        60
OIR    2025130    131400  -11.2700 -137.6700      37.6       355       147        60
OIR    2025130    131400  -11.2700 -137.6800      37.2       354       148        60
OIR    2025130    131400  -11.2700 -137.6900      36.0       354       149        60
OIR    2025130    131400  -11.2700 -137.7000      34.0       352       151        60
OIR    2025130    131400  -11.2700 -137.7700      27.8       350       151        60
OIR    2025130    131400  -11.2700 -137.7800      27.8       350       151        60
OIR    2025130    131400  -11.2700 -137.7900      27.8       350       149        60
OIR    2025130    131400  -11.2700 -137.8000      27.7       350       146        60
OIR    2025130    131400  -11.2700 -137.8100      27.7       350       145        60
OIR    2025130    131400  -11.2700 -137.8200      27.7       351       145        60
OIR    2025130    131400  -11.2700 -137.8300      27.6       351       144        60
OIR    2025130    131400  -11.2700 -137.8400      27.6       351       142        60
OIR    2025130    131400  -11.2700 -137.8500      27.6       351       144        60
OIR    2025130    131400  -11.2700 -137.8600      27.5       351       146        60
OIR    2025130    131400  -11.2700 -137.8700      27.5       351       144        60
OIR    2025130    131400  -11.2700 -137.8800      27.5       351       144        60
OIR    2025130    131400  -11.2700 -137.8900      27.4       350       146        60
OIR    2025130    131400  -11.2700 -137.9000      27.4       350       147        60
OIR    2025130    131400  -11.2700 -137.9100      27.4       350       147        60
OIR    2025130    131400  -11.2700 -137.9200      27.4       350       148        60
OIR    2025130    131400  -11.2700 -137.9300      27.4       350       148        60
OIR    2025130    131400  -11.2700 -137.9400      27.4       350       147        60
OIR    2025130    131400  -11.2700 -137.9500      27.4       350       145        60
OIR    2025130    131400  -11.2700 -137.9600      27.4       350       148        60
OIR    2025130    131400  -11.2700 -137.9700      27.3       350       151        60
OIR    2025130    131400  -11.2700 -137.9800      27.3       350       149        60
OIR    2025130    131400  -11.2700 -137.9900      27.3       350       148        60
OIR    2025130    131400  -11.2700 -138.0000      27.3       350       151        60
OIR    2025130    131400  -11.2700 -138.0100      27.3       350       150        60
OIR    2025130    131400  -11.2700 -138.0200      27.2       350       148        60
OIR    2025130    131400  -11.2700 -138.0300      26.9       350       146        60
OIR    2025130    131400  -11.2700 -138.0400      26.5       350       145        60
OIR    2025130    131400  -11.2700 -138.0500      26.0       349       145        60
OIR    2025130    131400  -11.2700 -138.0600      25.5       349       145        60
OIR    2025130    131400  -11.2700 -138.0700      25.2       349       145        60
OIR    2025130    131400  -11.2700 -138.0800      25.1       349       145        60
OIR    2025130    131400  -11.2700 -138.0900      25.0       348       145        60
OIR    2025130    131400  -11.2700 -138.1000      25.0       348       144        60
OIR    2025130    131400  -11.2700 -138.1100      25.0       348       144        60
OIR    2025130    131400  -11.2700 -138.1200      24.9       349       144        60
OIR    2025130    131400  -11.2700 -138.1300      24.9       349       143        60
OIR    2025130    131400  -11.2700 -138.1400      24.9       349       142        60
OIR    2025130    131400  -11.2700 -138.1500      24.9       349       141        60
OIR    2025130    131400  -11.2700 -138.1600      24.9       349       140        60
OIR    2025130    131400  -11.2700 -138.1700      24.9       349       139        60
OIR    2025130    131400  -11.2700 -138.1800      24.9       349       140        60
OIR    2025130    131400  -11.2700 -138.1900      24.8       349       142        60
OIR    2025130    131400  -11.2700 -138.2000      24.7       349       143        60
OIR    2025130    131400  -11.2700 -138.2100      24.5       349       144        60
OIR    2025130    131400  -11.2700 -138.2200      24.0       349       145        60
OIR    2025130    131400  -11.2700 -138.2300      23.4       350       146        60
OIR    2025130    131400  -11.2700 -138.2400      22.9       350       146        60
OIR    2025130    131400  -11.2700 -138.2500      22.4       351       145        60
OIR    2025130    131400  -11.2700 -138.2600      22.0       351       142        60
OIR    2025130    131400  -11.2700 -138.2700      21.8       352       143        60
OIR    2025130    131400  -11.2700 -138.2800      21.6       352       145        60
OIR    2025130    131400  -11.2700 -138.2900      21.5       353       145        60
OIR    2025130    131400  -11.2700 -138.3000      21.4       353       145        60
OIR    2025130    131400  -11.2700 -138.3100      21.4       354       149        60
OIR    2025130    131400  -11.2700 -138.3400      21.3       356       150        60
OIR    2025130    131400  -11.2800 -137.1600      27.8         4       151        60
OIR    2025130    131400  -11.2800 -137.1700      27.4         4       151        60
OIR    2025130    131400  -11.2800 -137.1800      27.2         3       151        60
OIR    2025130    131400  -11.2800 -137.1900      27.0         3       150        60
OIR    2025130    131400  -11.2800 -137.2000      26.8         2       150        60
OIR    2025130    131400  -11.2800 -137.2100      26.6         2       150        60
OIR    2025130    131400  -11.2800 -137.2200      26.4         2       150        60
OIR    2025130    131400  -11.2800 -137.2300      26.3         1       151        60
OIR    2025130    131400  -11.2800 -137.4100      39.3       356       151        60
OIR    2025130    131400  -11.2800 -137.4200      39.4       356       148        60
OIR    2025130    131400  -11.2800 -137.4300      39.4       356       149        60
OIR    2025130    131400  -11.2800 -137.4400      39.3       356       148        60
OIR    2025130    131400  -11.2800 -137.4500      39.1       356       146        60
OIR    2025130    131400  -11.2800 -137.4600      39.0       356       146        60
OIR    2025130    131400  -11.2800 -137.4700      38.8       356       146        60
OIR    2025130    131400  -11.2800 -137.4800      38.8       356       146        60
OIR    2025130    131400  -11.2800 -137.4900      38.8       356       145        60
OIR    2025130    131400  -11.2800 -137.5000      38.8       356       147        60
OIR    2025130    131400  -11.2800 -137.5100      38.9       356       149        60
OIR    2025130    131400  -11.2800 -137.5200      39.0       356       148        60
OIR    2025130    131400  -11.2800 -137.5300      39.3       356       147        60
OIR    2025130    131400  -11.2800 -137.5400      39.5       356       145        60
OIR    2025130    131400  -11.2800 -137.5500      39.6       356       143        60
OIR    2025130    131400  -11.2800 -137.5600      39.6       356       142        60
OIR    2025130    131400  -11.2800 -137.5700      39.6       356       142        60
OIR    2025130    131400  -11.2800 -137.5800      39.5       356       141        60
OIR    2025130    131400  -11.2800 -137.5900      39.3       356       141        60
OIR    2025130    131400  -11.2800 -137.6000      39.1       356       140        60
OIR    2025130    131400  -11.2800 -137.6100      38.8       355       140        60
OIR    2025130    131400  -11.2800 -137.6200      38.3       355       139        60
OIR    2025130    131400  -11.2800 -137.6300      38.1       355       141        60
OIR    2025130    131400  -11.2800 -137.6400      38.0       355       142        60
OIR    2025130    131400  -11.2800 -137.6500      37.9       355       144        60
OIR    2025130    131400  -11.2800 -137.6600      37.8       355       145        60
OIR    2025130    131400  -11.2800 -137.6700      37.6       355       147        60
OIR    2025130    131400  -11.2800 -137.6800      37.1       354       149        60
OIR    2025130    131400  -11.2800 -137.8000      27.9       351       149        60
OIR    2025130    131400  -11.2800 -137.8100      27.9       351       147        60
OIR    2025130    131400  -11.2800 -137.8200      27.8       351       148        60
OIR    2025130    131400  -11.2800 -137.8300      27.8       351       147        60
OIR    2025130    131400  -11.2800 -137.8400      27.7       351       146        60
OIR    2025130    131400  -11.2800 -137.8500      27.6       351       148        60
OIR    2025130    131400  -11.2800 -137.8600      27.6       351       149        60
OIR    2025130    131400  -11.2800 -137.8700      27.5       351       148        60
OIR    2025130    131400  -11.2800 -137.8800      27.5       351       148        60
OIR    2025130    131400  -11.2800 -137.8900      27.4       351       148        60
OIR    2025130    131400  -11.2800 -137.9000      27.4       351       149        60
OIR    2025130    131400  -11.2800 -137.9100      27.4       350       150        60
OIR    2025130    131400  -11.2800 -137.9200      27.4       350       150        60
OIR    2025130    131400  -11.2800 -137.9300      27.4       350       149        60
OIR    2025130    131400  -11.2800 -137.9400      27.4       350       147        60
OIR    2025130    131400  -11.2800 -137.9500      27.4       350       146        60
OIR    2025130    131400  -11.2800 -137.9600      27.4       350       147        60
OIR    2025130    131400  -11.2800 -137.9700      27.3       350       147        60
OIR    2025130    131400  -11.2800 -137.9800      27.3       350       147        60
OIR    2025130    131400  -11.2800 -137.9900      27.3       350       147        60
OIR    2025130    131400  -11.2800 -138.0000      27.3       350       150        60
OIR    2025130    131400  -11.2800 -138.0100      27.2       350       150        60
OIR    2025130    131400  -11.2800 -138.0200      27.0       350       149        60
OIR    2025130    131400  -11.2800 -138.0300      26.6       350       149        60
OIR    2025130    131400  -11.2800 -138.0400      26.0       349       149        60
OIR    2025130    131400  -11.2800 -138.0500      25.5       349       149        60
OIR    2025130    131400  -11.2800 -138.0600      25.2       349       148        60
OIR    2025130    131400  -11.2800 -138.0700      25.0       349       147        60
OIR    2025130    131400  -11.2800 -138.0800      25.0       348       146        60
OIR    2025130    131400  -11.2800 -138.0900      24.9       348       146        60
OIR    2025130    131400  -11.2800 -138.1000      24.9       348       146        60
OIR    2025130    131400  -11.2800 -138.1100      24.9       348       146        60
OIR    2025130    131400  -11.2800 -138.1200      24.9       348       146        60
OIR    2025130    131400  -11.2800 -138.1300      24.9       349       144        60
OIR    2025130    131400  -11.2800 -138.1400      24.9       349       144        60
OIR    2025130    131400  -11.2800 -138.1500      24.9       349       144        60
OIR    2025130    131400  -11.2800 -138.1600      24.9       349       144        60
OIR    2025130    131400  -11.2800 -138.1700      24.9       349       143        60
OIR    2025130    131400  -11.2800 -138.1800      24.9       349       144        60
OIR    2025130    131400  -11.2800 -138.1900      24.8       349       146        60
OIR    2025130    131400  -11.2800 -138.2000      24.6       349       146        60
OIR    2025130    131400  -11.2800 -138.2100      24.3       349       146        60
OIR    2025130    131400  -11.2800 -138.2200      23.7       350       147        60
OIR    2025130    131400  -11.2800 -138.2300      23.1       350       147        60
OIR    2025130    131400  -11.2800 -138.2400      22.6       350       149        60
OIR    2025130    131400  -11.2800 -138.2500      22.1       351       148        60
OIR    2025130    131400  -11.2800 -138.2600      21.8       352       145        60
OIR    2025130    131400  -11.2800 -138.2700      21.6       352       145        60
OIR    2025130    131400  -11.2800 -138.2800      21.5       352       145        60
OIR    2025130    131400  -11.2800 -138.2900      21.3       353       146        60
OIR    2025130    131400  -11.2800 -138.3000      21.2       353       146        60
OIR    2025130    131400  -11.2900 -137.4200      38.8       356       152        60
OIR    2025130    131400  -11.2900 -137.4400      38.6       356       150        60
OIR    2025130    131400  -11.2900 -137.4500      38.5       356       148        60
OIR    2025130    131400  -11.2900 -137.4600      38.5       356       147        60
OIR    2025130    131400  -11.2900 -137.4700      38.5       356       147        60
OIR    2025130    131400  -11.2900 -137.4800      38.5       356       148        60
OIR    2025130    131400  -11.2900 -137.4900      38.5       356       148        60
OIR    2025130    131400  -11.2900 -137.5000      38.5       356       150        60
OIR    2025130    131400  -11.2900 -137.5100      38.5       356       151        60
OIR    2025130    131400  -11.2900 -137.5200      38.7       356       151        60
OIR    2025130    131400  -11.2900 -137.5300      38.9       356       150        60
OIR    2025130    131400  -11.2900 -137.5400      39.2       356       148        60
OIR    2025130    131400  -11.2900 -137.5500      39.3       356       146        60
OIR    2025130    131400  -11.2900 -137.5600      39.3       356       146        60
OIR    2025130    131400  -11.2900 -137.5700      39.3       356       145        60
OIR    2025130    131400  -11.2900 -137.5800      39.1       356       145        60
OIR    2025130    131400  -11.2900 -137.5900      39.0       356       144        60
OIR    2025130    131400  -11.2900 -137.6000      38.8       356       143        60
OIR    2025130    131400  -11.2900 -137.6100      38.6       355       142        60
OIR    2025130    131400  -11.2900 -137.6200      38.3       355       141        60
OIR    2025130    131400  -11.2900 -137.6300      38.0       355       142        60
OIR    2025130    131400  -11.2900 -137.6400      37.9       355       144        60
OIR    2025130    131400  -11.2900 -137.6500      37.8       355       145        60
OIR    2025130    131400  -11.2900 -137.6600      37.7       355       146        60
OIR    2025130    131400  -11.2900 -137.6700      37.5       355       148        60
OIR    2025130    131400  -11.2900 -137.6800      37.0       354       150        60
OIR    2025130    131400  -11.2900 -137.8100      27.9       351       150        60
OIR    2025130    131400  -11.2900 -137.8200      27.9       351       149        60
OIR    2025130    131400  -11.2900 -137.8300      27.9       351       149        60
OIR    2025130    131400  -11.2900 -137.8400      27.8       351       148        60
OIR    2025130    131400  -11.2900 -137.8500      27.8       351       150        60
OIR    2025130    131400  -11.2900 -137.8600      27.7       351       151        60
OIR    2025130    131400  -11.2900 -137.8700      27.6       351       151        60
OIR    2025130    131400  -11.2900 -137.8800      27.5       351       150        60
OIR    2025130    131400  -11.2900 -137.8900      27.5       351       149        60
OIR    2025130    131400  -11.2900 -137.9000      27.4       351       150        60
OIR    2025130    131400  -11.2900 -137.9100      27.4       351       151        60
OIR    2025130    131400  -11.2900 -137.9200      27.4       350       151        60
OIR    2025130    131400  -11.2900 -137.9300      27.4       350       149        60
OIR    2025130    131400  -11.2900 -137.9400      27.4       350       149        60
OIR    2025130    131400  -11.2900 -137.9500      27.4       350       148        60
OIR    2025130    131400  -11.2900 -137.9600      27.4       350       147        60
OIR    2025130    131400  -11.2900 -137.9700      27.3       350       146        60
OIR    2025130    131400  -11.2900 -137.9800      27.3       350       146        60
OIR    2025130    131400  -11.2900 -137.9900      27.3       350       148        60
OIR    2025130    131400  -11.2900 -138.0000      27.3       350       150        60
OIR    2025130    131400  -11.2900 -138.0100      27.1       350       151        60
OIR    2025130    131400  -11.2900 -138.0200      26.7       350       151        60
OIR    2025130    131400  -11.2900 -138.0300      26.1       349       151        60
OIR    2025130    131400  -11.2900 -138.0500      25.2       349       151        60
OIR    2025130    131400  -11.2900 -138.0600      25.0       349       150        60
OIR    2025130    131400  -11.2900 -138.0700      25.0       348       149        60
OIR    2025130    131400  -11.2900 -138.0800      24.9       348       147        60
OIR    2025130    131400  -11.2900 -138.0900      24.9       348       147        60
OIR    2025130    131400  -11.2900 -138.1000      24.9       348       147        60
OIR    2025130    131400  -11.2900 -138.1100      24.9       348       148        60
OIR    2025130    131400  -11.2900 -138.1200      24.9       348       148        60
OIR    2025130    131400  -11.2900 -138.1300      24.9       349       147        60
OIR    2025130    131400  -11.2900 -138.1400      24.9       349       147        60
OIR    2025130    131400  -11.2900 -138.1500      24.9       349       147        60
OIR    2025130    131400  -11.2900 -138.1600      24.9       349       147        60
OIR    2025130    131400  -11.2900 -138.1700      24.9       349       146        60
OIR    2025130    131400  -11.2900 -138.1800      24.8       349       147        60
OIR    2025130    131400  -11.2900 -138.1900      24.7       349       149        60
OIR    2025130    131400  -11.2900 -138.2000      24.4       349       149        60
OIR    2025130    131400  -11.2900 -138.2100      23.8       349       148        60
OIR    2025130    131400  -11.2900 -138.2200      23.2       350       148        60
OIR    2025130    131400  -11.2900 -138.2300      22.7       350       148        60
OIR    2025130    131400  -11.2900 -138.2400      22.2       351       149        60
OIR    2025130    131400  -11.2900 -138.2500      21.8       351       149        60
OIR    2025130    131400  -11.2900 -138.2600      21.6       352       147        60
OIR    2025130    131400  -11.2900 -138.2700      21.4       352       146        60
OIR    2025130    131400  -11.2900 -138.2800      21.3       353       146        60
OIR    2025130    131400  -11.2900 -138.2900      21.1       353       147        60
OIR    2025130    131400  -11.2900 -138.3000      21.0       353       148        60
OIR    2025130    131400  -11.3000 -137.4500      38.4       356       151        60
OIR    2025130    131400  -11.3000 -137.4600      38.4       356       149        60
OIR    2025130    131400  -11.3000 -137.4700      38.4       356       147        60
OIR    2025130    131400  -11.3000 -137.4800      38.4       356       147        60
OIR    2025130    131400  -11.3000 -137.4900      38.4       356       148        60
OIR    2025130    131400  -11.3000 -137.5000      38.4       356       151        60
OIR    2025130    131400  -11.3000 -137.5700      39.1       356       151        60
OIR    2025130    131400  -11.3000 -137.5800      39.0       356       149        60
OIR    2025130    131400  -11.3000 -137.5900      38.8       356       147        60
OIR    2025130    131400  -11.3000 -137.6000      38.6       356       145        60
OIR    2025130    131400  -11.3000 -137.6100      38.5       355       145        60
OIR    2025130    131400  -11.3000 -137.6200      38.2       355       145        60
OIR    2025130    131400  -11.3000 -137.6300      38.0       355       146        60
OIR    2025130    131400  -11.3000 -137.6400      37.9       355       146        60
OIR    2025130    131400  -11.3000 -137.6500      37.8       355       147        60
OIR    2025130    131400  -11.3000 -137.6600      37.7       355       148        60
OIR    2025130    131400  -11.3000 -137.6700      37.4       355       150        60
OIR    2025130    131400  -11.3000 -137.8200      28.0       352       150        60
OIR    2025130    131400  -11.3000 -137.8300      28.0       352       150        60
OIR    2025130    131400  -11.3000 -137.8400      28.0       352       150        60
OIR    2025130    131400  -11.3000 -137.8500      27.9       352       150        60
OIR    2025130    131400  -11.3000 -137.8600      27.8       352       151        60
OIR    2025130    131400  -11.3000 -137.8900      27.6       351       150        60
OIR    2025130    131400  -11.3000 -137.9000      27.5       351       149        60
OIR    2025130    131400  -11.3000 -137.9100      27.5       351       151        60
OIR    2025130    131400  -11.3000 -137.9200      27.4       351       151        60
OIR    2025130    131400  -11.3000 -137.9300      27.4       350       151        60
OIR    2025130    131400  -11.3000 -137.9600      27.4       350       149        60
OIR    2025130    131400  -11.3000 -137.9700      27.3       350       147        60
OIR    2025130    131400  -11.3000 -137.9800      27.3       350       148        60
OIR    2025130    131400  -11.3000 -137.9900      27.3       350       149        60
OIR    2025130    131400  -11.3000 -138.0600      25.0       348       151        60
OIR    2025130    131400  -11.3000 -138.0700      24.9       348       150        60
OIR    2025130    131400  -11.3000 -138.0800      24.9       348       149        60
OIR    2025130    131400  -11.3000 -138.0900      24.9       348       148        60
OIR    2025130    131400  -11.3000 -138.1000      24.9       348       147        60
OIR    2025130    131400  -11.3000 -138.1100      24.9       348       148        60
OIR    2025130    131400  -11.3000 -138.1200      24.9       348       149        60
OIR    2025130    131400  -11.3000 -138.1500      24.9       349       150        60
OIR    2025130    131400  -11.3000 -138.1600      24.8       349       149        60
OIR    2025130    131400  -11.3000 -138.1700      24.8       349       148        60
OIR    2025130    131400  -11.3000 -138.1800      24.7       349       149        60
OIR    2025130    131400  -11.3000 -138.2100      23.4       350       151        60
OIR    2025130    131400  -11.3000 -138.2200      22.8       350       148        60
OIR    2025130    131400  -11.3000 -138.2300      22.3       350       146        60
OIR    2025130    131400  -11.3000 -138.2400      21.9       351       146        60
OIR    2025130    131400  -11.3000 -138.2500      21.5       351       146        60
OIR    2025130    131400  -11.3000 -138.2600      21.3       352       147        60
OIR    2025130    131400  -11.3000 -138.2700      21.2       352       147        60
OIR    2025130    131400  -11.3000 -138.2800      21.1       353       148        60
OIR    2025130    131400  -11.3000 -138.3200      20.7       354       149        60
OIR    2025130    131400  -11.3000 -138.3300      20.7       355       149        60
OIR    2025130    131400  -11.3000 -138.3400      20.8       355       149        60
OIR    2025130    131400  -11.3100 -137.4600      38.4       356       152        60
OIR    2025130    131400  -11.3100 -137.4700      38.4       356       150        60
OIR    2025130    131400  -11.3100 -137.4800      38.4       356       149        60
OIR    2025130    131400  -11.3100 -137.4900      38.4       356       150        60
OIR    2025130    131400  -11.3100 -137.5900      38.7       356       150        60
OIR    2025130    131400  -11.3100 -137.6000      38.5       356       149        60
OIR    2025130    131400  -11.3100 -137.6100      38.4       355       149        60
OIR    2025130    131400  -11.3100 -137.6200      38.2       355       149        60
OIR    2025130    131400  -11.3100 -137.6300      38.0       355       149        60
OIR    2025130    131400  -11.3100 -137.6400      37.8       355       150        60
OIR    2025130    131400  -11.3100 -137.6500      37.7       355       151        60
OIR    2025130    131400  -11.3100 -137.9000      27.8       351       151        60
OIR    2025130    131400  -11.3100 -138.0800      24.9       348       151        60
OIR    2025130    131400  -11.3100 -138.0900      24.9       348       149        60
OIR    2025130    131400  -11.3100 -138.1000      24.9       348       148        60
OIR    2025130    131400  -11.3100 -138.1100      24.9       348       149        60
OIR    2025130    131400  -11.3100 -138.1600      24.8       349       151        60
OIR    2025130    131400  -11.3100 -138.1700      24.7       349       150        60
OIR    2025130    131400  -11.3100 -138.2300      21.7       350       148        60
OIR    2025130    131400  -11.3100 -138.2400      21.4       351       148        60
OIR    2025130    131400  -11.3100 -138.2500      21.2       351       148        60
OIR    2025130    131400  -11.3100 -138.2600      21.1       352       149        60
OIR    2025130    131400  -11.3200 -138.0900      24.8       348       151        60
OIR    2025130    131400  -11.3200 -138.1000      24.8       348       151        60
OIR    2025130    131400  -11.3200 -138.1700      24.5       349       151        60
OIR    2025130    131400  -11.3200 -138.2300      21.2       351       151        60
OIR    2025130    131400  -11.3400 -138.1400      24.6       348       150        60
OIR    2025130    131400  -11.3400 -138.1500      24.5       349       149        60
OIR    2025130    131400  -11.3400 -138.1600      24.2       349       151        60
OIR    2025130    131400  -11.3500 -138.1300      24.5       348       151        60
OIR    2025130    131400  -11.3500 -138.1400      24.4       349       150        60
OIR    2025130    131400  -11.3500 -138.1500      24.1       349       150        60
OIR    2025130    131400  -11.3600 -132.5000      17.4        18       140        60
OIR    2025130    131400  -11.3600 -138.1300      24.3       348       150        60
OIR    2025130    131400  -11.3600 -138.1400      24.0       349       150        60
OIR    2025130    131400  -11.3600 -138.1500      23.3       349       151        60
OIR    2025130    131400  -11.4100 -134.3600      18.7        28       147        60
OIR    2025130    131400  -11.7500 -132.8800      15.0         7       142        60
OIR    2025130    131400  -11.9200 -132.7800      16.8        18       129        60
OIR    2025130    131400  -11.9300 -132.7800      16.9        18       138        60
OIR    2025130    131400  -12.0200 -136.5000       8.6       331       136        60
OIR    2025130    131400  -12.0500 -140.9300      13.2       347       134        60
OIR    2025130    131400  -12.0700 -139.9700      14.6       341       104        60
OIR    2025130    131400  -12.0800 -139.9700      14.5       341       104        60
OIR    2025130    131400  -12.0800 -139.9800      14.5       341       165        60
OIR    2025130    131400  -12.0800 -140.0100      14.4       341       168        60
OIR    2025130    131400  -12.0900 -139.9700      14.5       341       119        60
OIR    2025130    131400  -12.0900 -140.0100      14.3       341       129        60
OIR    2025130    131400  -12.1100 -132.8500       8.6       359       130        60
OIR    2025130    131400  -12.1100 -132.8900       9.5        12       121        60
OIR    2025130    131400  -12.1200 -132.8900      12.8         5       127        60
OIR    2025130    131400  -12.1300 -132.8900      12.7         6       134        60
OIR    2025130    131400  -12.1400 -140.0100      14.1       341       135        60
OIR    2025130    131400  -12.1400 -140.1300      13.7       340       158        60
OIR    2025130    131400  -12.1400 -140.1400      13.6       340       151        60
OIR    2025130    131400  -12.1500 -132.5500      18.2         8       144        60
OIR    2025130    131400  -12.1500 -140.0100      14.1       341       161        60
OIR    2025130    131400  -12.1500 -140.1300      13.6       340       163        60
OIR    2025130    131400  -12.1600 -140.1200      13.5       340       129        60
OIR    2025130    131400  -12.1700 -140.1200      13.4       340       161        60
OIR    2025130    131400  -12.1800 -140.1300      13.3       340       148        60
OIR    2025130    131400  -12.1800 -140.1400      13.3       340       142        60
OIR    2025130    131400  -12.2200 -132.4700      15.1        16       143        60
OIR    2025130    131400  -12.2200 -132.7500      24.5       150       138        60
OIR    2025130    131400  -12.2300 -132.4700      15.1        15       140        60
OIR    2025130    131400  -12.2500 -134.1700      25.7        80       123        60
OIR    2025130    131400  -12.2500 -134.1800      27.4        84       128        60
OIR    2025130    131400  -12.2500 -134.1900      26.5        87       132        60
OIR    2025130    131400  -12.2500 -139.5600      23.2       339       143        60
OIR    2025130    131400  -12.2600 -134.1700      24.6        79       119        60
OIR    2025130    131400  -12.2600 -134.1800      28.9        80       131        60
OIR    2025130    131400  -12.2600 -139.4400      28.0       341       127        60
OIR    2025130    131400  -12.2700 -134.1500      24.4        46       131        60
OIR    2025130    131400  -12.2700 -134.1600      29.1        78       123        60
OIR    2025130    131400  -12.2700 -134.1700      24.5        84       126        60
OIR    2025130    131400  -12.2700 -139.4400      27.2       341       127        60
OIR    2025130    131400  -12.2800 -134.1700      25.7        97       138        60
OIR    2025130    131400  -12.2800 -139.4400      26.7       341       121        60
OIR    2025130    131400  -12.2900 -139.4400      25.9       341       109        60
OIR    2025130    131400  -12.2900 -139.4500      25.7       341       129        60
OIR    2025130    131400  -12.2900 -139.4600      25.6       341       142        60
OIR    2025130    131400  -12.3000 -132.7500      31.6        32       117        60
OIR    2025130    131400  -12.3000 -139.4500      25.4       341       123        60
OIR    2025130    131400  -12.3000 -139.4600      25.2       341       138        60
OIR    2025130    131400  -12.3100 -134.0700      20.3        13       143        60
OIR    2025130    131400  -12.3100 -139.8600      13.2       337       127        60
OIR    2025130    131400  -12.3100 -139.9300      12.3       337       135        60
OIR    2025130    131400  -12.3100 -139.9400      12.3       337       163        60
OIR    2025130    131400  -12.3200 -139.8600      12.4       337       162        60
OIR    2025130    131400  -12.3200 -139.9300      12.1       337       161        60
OIR    2025130    131400  -12.3500 -139.8600      11.5       337       112        60
OIR    2025130    131400  -12.3500 -140.3400      11.6       333       120        60
OIR    2025130    131400  -12.3700 -133.2500      15.3       358       122        60
OIR    2025130    131400  -12.3700 -133.2600      20.4       280       136        60
OIR    2025130    131400  -12.3700 -139.4700      22.7       340       117        60
OIR    2025130    131400  -12.3800 -139.9700      11.4       337       155        60
OIR    2025130    131400  -12.3900 -139.8200      11.3       337       135        60
OIR    2025130    131400  -12.3900 -139.8300      11.3       337       156        60
OIR    2025130    131400  -12.3900 -139.9700      11.3       337       123        60
OIR    2025130    131400  -12.4000 -139.8400      11.2       337       155        60
OIR    2025130    131400  -12.4100 -132.6300      13.8        11       142        60
OIR    2025130    131400  -12.4100 -139.8400      11.2       337       147        60
OIR    2025130    131400  -12.4200 -132.6300      14.0        11       135        60
OIR    2025130    131400  -12.4300 -132.5600      13.2        10       142        60
OIR    2025130    131400  -12.4300 -132.6300      14.6         9       134        60
OIR    2025130    131400  -12.4300 -132.9300      16.6        20       139        60
OIR    2025130    131400  -12.4300 -132.9700      17.7         8       124        60
OIR    2025130    131400  -12.4300 -133.2000      24.4       327       132        60
OIR    2025130    131400  -12.4400 -139.7500      11.0       337       127        60
OIR    2025130    131400  -12.4400 -139.7800      11.0       337       149        60
OIR    2025130    131400  -12.4400 -139.7900      11.0       337       160        60
OIR    2025130    131400  -12.4400 -139.8200      10.9       337       136        60
OIR    2025130    131400  -12.4500 -133.0000      18.2         8       139        60
OIR    2025130    131400  -12.4500 -133.0100      18.2         8       136        60
OIR    2025130    131400  -12.4500 -139.7500      10.9       337       163        60
OIR    2025130    131400  -12.4500 -139.8200      10.8       337       167        60
OIR    2025130    131400  -12.4600 -133.2100      23.0       182       140        60
OIR    2025130    131400  -12.4600 -139.9100      10.7       336       155        60
OIR    2025130    131400  -12.4600 -139.9200      10.7       336       152        60
OIR    2025130    131400  -12.4700 -133.0800      19.1        15       142        60
OIR    2025130    131400  -12.4800 -139.9300      10.3       336       122        60
OIR    2025130    131400  -12.4800 -139.9400      10.3       336       162        60
OIR    2025130    131400  -12.4900 -132.4800      16.3        20       133        60
OIR    2025130    131400  -12.4900 -132.4900      16.1        18       141        60
OIR    2025130    131400  -12.4900 -133.0000      18.2         6       142        60
OIR    2025130    131400  -12.5000 -139.7100      10.0       337       119        60
OIR    2025130    131400  -12.5000 -140.5300      11.8       322       129        60
OIR    2025130    131400  -12.5000 -140.5400      12.0       324       126        60
OIR    2025130    131400  -12.5100 -140.5300      10.6       321       142        60
OIR    2025130    131400  -12.5400 -132.7200      17.8       258       139        60
OIR    2025130    131400  -12.5600 -132.8200      19.2        15       129        60
OIR    2025130    131400  -12.5800 -139.5600       7.1       338       162        60
OIR    2025130    131400  -12.6100 -132.5500      14.5         9       139        60
OIR    2025130    131400  -12.6100 -132.6300      18.9        16       138        60
OIR    2025130    131400  -12.6200 -132.5500      13.0        10       109        60
OIR    2025130    131400  -12.6200 -132.5600      13.5        11       134        60
OIR    2025130    131400  -12.6200 -132.6200      18.9        18       140        60
OIR    2025130    131400  -12.6200 -132.6300      18.2        16       124        60
OIR    2025130    131400  -12.6200 -132.8500      23.3        23       137        60
OIR    2025130    131400  -12.6300 -132.5500      10.8         9       146        60
